AGNICO EAGLE REPORTS THIRD QUARTER 2025 RESULTS - RECORD ADJUSTED NET INCOME WITH ANOTHER QUARTER OF STRONG PRODUCTION; FINANCIAL POSITION FURTHER STRENGTHENED BY REPAYMENT OF LONG-TERM DEBT AND CASH ACCUMULATION
Agnico Eagle (NYSE: AEM) reported Q3 2025 results with record adjusted net income of $1,085 million and net income of $1,055 million ($2.10/share). Payable gold production was 866,936 ounces in the quarter (year-to-date ~77% of the mid-point of 2025 guidance).
The company generated $1,190 million of free cash flow in Q3 and increased net cash to $2,159 million after reducing long-term debt by $400 million. Realized gold price was $3,476/oz, dividends declared were $0.40/share and share repurchases totaled $150 million. 2025 production guidance remains 3.3–3.5 million oz; capex guidance is $1.75–$1.95 billion.
- Record adjusted net income of $1,085 million
- Free cash flow of $1,190 million in Q3 2025
- Net cash position increased to $2,159 million
- Long-term debt reduced by $400 million to $196 million
- Share repurchases of $150 million and dividend $0.40/share
- AISC rose to $1,373 per ounce in Q3 2025
- Total cash costs increased to $994 per ounce in Q3 2025
- Higher gold prices raised royalty-linked costs by ~$61/oz in Q3
- YTD production at ~77% of midpoint may pressure Q4 delivery
Insights
Agnico Eagle reports record adjusted net income, strong free cash flow, and a materially stronger balance sheet after debt repayment and cash accumulation.
Agnico Eagle delivered record adjusted net income of 
The business model is clear: higher realized gold prices expanded margins and produced strong free cash flow (
Key items to watch over the next 3–12 months include whether full-year payable production meets the reiterated guidance of 
Stock Symbol: AEM (NYSE and TSX)
                  (All amounts expressed in 
                  
"We delivered another quarter of strong and consistent operational performance, which translated into record financial results as higher gold prices continue to drive expanded margins. With solid year-to-date performance, we are well on track to meet our full year production and cost guidance, supported by disciplined cost management and a focus on productivity," said Ammar Al-Joundi, Agnico Eagle's President and Chief Executive Officer. "With the record free cash flow generation year-to-date and a strengthened financial position, we continue to advance our five key pipeline projects and create value through the drill bit. We remain disciplined in our approach to capital allocation and we continue to provide strong returns to our shareholders through dividends and share buybacks."
Third quarter 2025 highlights:
- 
                    Strong quarterly gold production – Payable gold production1 was 866,936 ounces at production costs per ounce of $963 $994 $1,373 77% of the mid-point of the Company's full-year guidance, with total cash costs per ounce at approximately the mid-point of guidance
- 
                    Higher gold prices generate stronger margins, while impacting royalty costs – Royalty costs, which are included in the calculation of total cash costs per ounce and AISC per ounce, are directly linked to gold prices. The average realized gold price in the third quarter of 2025 was $3,476 $3,221 $2,500 $976 $721 $61 $34 
- 
                    Record quarterly adjusted net income and strong free cash flow generation – The Company reported quarterly net income of $1,055 million $2.10 $1,085 million $2.16 $1,816 million $3.62 $1,661 million $3.31 $1,190 million $2.37 $1,035 million $2.06 
- 
                    2025 gold production and unit cost guidance reiterated – Full year expected payable gold production in 2025 remains unchanged at 3.3 to 3.5 million ounces. If gold prices remain elevated for the remainder of 2025, total cash costs per ounce and AISC per ounce in 2025 are expected to trend towards the top end of the guidance ranges of $915 $965 $1,250 $1,300 $1.75 billion $1.95 billion $290 $310 million 
- 
                    Financial position further strengthened through cash accumulation and debt repayment – The Company increased its net cash5 position to $2,159 million $797 million $2,355 million $400 million $196 million $50 million 4.15% 2015 senior notes at maturity and also redeemed the outstanding principal of$350 million 4.38% to4.63% . In addition, in August 2025, Moody's upgraded the Company's long-term issuer rating to A3 from Baa1
- 
                    Increased quarterly share repurchases demonstrate continued focus on shareholder returns – A quarterly dividend of $0.40 $149.02 $150 million 
- 
                    Update on key value drivers and pipeline projects in the third quarter of 2025
                    - Canadian Malartic – Excavation of the first loading station between levels 102 and 114 was completed, and conventional shaft sinking resumed. Development of East Gouldie production levels and support infrastructure progressed on schedule for planned production in the second half of 2026. Exploration drilling in the upper eastern extension of the East Gouldie deposit near the current shaft and ramp infrastructure was highlighted by 4.8 grams per tonne ("g/t") gold over 25.4 metres at 884 metres depth and 5.5 g/t gold over 15.4 metres at 907 metres depth, potentially providing a second mining area and potentially utilize excess mill capacity. Drilling also continued to extend the East Gouldie deposit to the east and west in the lower portions of the deposit. Regional exploration continued to prioritize the Marban project, including optimization of a potential open pit and the possible eastern extension of the Marban deposit
- Detour Lake – Excavation of the exploration ramp commenced with the first blast completed on July 3, 2025. The exploration ramp advanced by 259 metres and reached a depth of 43 metres as at September 30, 2025. Exploration drilling into the high-grade corridor in the West Pit zone further defined the high-grade domains that could potentially be mined early in the underground project, with a highlight intercept of 2.7 g/t gold over 55.7 metres at 297 metres depth. Drilling into the West Extension zone at underground depths further confirmed the grades and continuity of mineralization in the western plunge of the deposit
- Upper Beaver – The shaft head frame and installation of the service hoist were completed on schedule, with shaft sinking expected to commence in the fourth quarter of 2025. At the ramp portal, excavation of the exploration ramp began and advanced by 268 metres, reaching a depth of 22 metres as at September 30, 2025
- 
                        Hope Bay – Site infrastructure upgrades advanced, including the addition of two wings at the Doris camp, the completion of the mill dismantling and the jetty expansion at Robert's Bay in time for the 2025 sealift season. Exploration drilling totaled 34,971 metres in the third quarter of 2025 (103,815 metres year-to-date), with a continued focus on mineral resource expansion and conversion of the Patch 7 zone in the Madrid deposit. Highlights including 16.9 g/t gold over 4.6 metres at 865 metres depth and 12.7 g/t gold over 9.3 metres at 834 metres depth in two of the deepest intercepts of the Patch 7 zone to date continue to support the potential for mineral resource expansion at depth and along strike
- 
                        San Nicolas – Minas deSan Nicolas continued to advance the feasibility study and execution strategy, with engineering expected to be30% complete by year-end. Drilling activities progressed with a focus on condemnation drilling and geological evaluation in proximity to the projected mine area
 
| _______________________________________ | 
| 1 Payable production of a mineral means the quantity of a mineral produced during a period contained in products that have been or will be sold by the Company whether such products are shipped during the period or held as inventory at the end of the period. Payable gold production for the three months ended September 30, 2025 excludes payable gold production at La India and Creston Mascota of 945 and 189 ounces, respectively, which were produced from residual leaching and 2,442 ounces of gold recovered at Hope Bay. | 
| 2 Total cash costs per ounce and all-in sustaining costs per ounce or AISC per ounce are non-GAAP ratios that are not standardized financial measures under IFRS® Accounting Standards and, in this news release, unless otherwise specified, are reported on (i) a per ounce of gold production basis, and (ii) a by-product basis. For a description of the composition and usefulness of these non-GAAP ratios and reconciliations of total cash costs per ounce and AISC per ounce to production costs on both a by-product and a co-product basis, see "Note Regarding Certain Measures of Performance" below. | 
| 3 Adjusted net income and adjusted net income per share are non-GAAP measures or ratios that are not standardized financial measures under IFRS Accounting Standards. For a description of the composition and usefulness of these non-GAAP measures and a reconciliation to net income see "Note Regarding Certain Measures of Performance" below. | 
| 4 Cash provided by operating activities before changes in non-cash components of working capital, free cash flow and free cash flow before changes in non-cash components of working capital and their related per share measures are non-GAAP measures or ratios that are not standardized financial measures under IFRS Accounting Standards. For a description of the composition and usefulness of these non-GAAP measures and a reconciliation to cash provided by operating activities see "Note Regarding Certain Measures of Performance" below. | 
| 5 Net cash (debt), that is, a negative "net debt" position, and net debt are non-GAAP measures that are not standardized financial measures under IFRS Accounting Standards. For a description of the composition and usefulness of these non-GAAP measures and a reconciliation to long-term debt, see "Note Regarding Certain Measures of Performance" below. | 
Third Quarter 2025 Results Conference Call and Webcast Tomorrow
The Company's senior management will host a conference call on Thursday, October 30, 2025, at 11:00 AM (E.D.T.) to discuss the Company's financial and operating results.
Via Webcast:
To listen to the live webcast of the conference call, you may register on the Company's website at www.agnicoeagle.com, or directly via the link here.
Via Phone:
To join the conference call by phone, please dial 416.945.7677 or toll-free 1.888.699.1199 to be entered into the call by an operator. To ensure your participation, please call approximately five minutes prior to the scheduled start of the call.
To join the conference call by phone without operator assistance, you may register your phone number here 30 minutes prior to the scheduled start of the call to receive an automated call back.
Replay Archive:
Please dial 289.819.1450 or toll-free 1.888.660.6345, access code 44229#. The conference call replay will expire on November 30, 2025.
The webcast, along with presentation slides, will be archived for 180 days on the Company's website.
Third Quarter 2025 Production and Costs
| Production and Cost Results Summary |  |  |  |  |  |  |  |  | 
|  |  | Three Months Ended September 30, |  | Nine Months Ended September 30, | ||||
|  |  | 2025 |  | 2024 |  | 2025 |  | 2024 | 
| Gold production* (ounces) |  | 866,936 |  | 863,445 |  | 2,606,759 |  | 2,637,935 | 
| Gold sales (ounces)** |  | 868,563 |  | 855,899 |  | 2,558,363 |  | 2,609,192 | 
| Production costs per ounce*** |  | $ 963 |  | $ 908 |  | $ 918 |  | $ 887 | 
| Total cash costs per ounce*** |  | $ 994 |  | $ 921 |  | $ 943 |  | $ 897 | 
| AISC per ounce*** |  | $ 1,373 |  | $ 1,286 |  | $ 1,281 |  | $ 1,214 | 
| * | Gold production for the three months ended September 30, 2025 excludes payable gold production at La India and Creston Mascota of 945 and 189 ounces, respectively, which were produced from residual leaching and 2,442 ounces of gold recovered at Hope Bay. Gold production for the nine months ended September 30, 2025 excludes payable gold production at La India and Creston Mascota of 3,614 and 253 ounces, respectively, and 2,442 ounces of gold recovered at Hope Bay. | 
| ** | 
                          Canadian Malartic's payable metal sold excludes the  | 
| *** | Production costs per ounce, total cash costs per ounce and AISC per ounce are reported on a per ounce of gold produced basis. | 
Gold Production
- Third Quarter of 2025 – Gold production increased when compared to the prior-year period primarily due to higher production from LaRonde (higher grade and throughput), Canadian Malartic (higher grade and throughput) and Macassa (higher grade), partially offset by lower production at Fosterville (lower grade and throughput) and Meliadine (lower grade)
- First Nine Months of 2025 – Gold production decreased when compared to the prior-year period primarily due to lower production from Fosterville (lower grade and throughput), Canadian Malartic (lower throughput) and La India (end of mine life), partially offset by higher production at Macassa and LaRonde (higher grades)
Production Costs per Ounce
- Third Quarter of 2025 – Production costs per ounce increased when compared to the prior-year period primarily due to higher royalty costs resulting from higher gold prices and lower build-up of stockpiles, partially offset by higher gold production and the benefit of the weaker Canadian dollar
- First Nine Months of 2025 – Production costs per ounce increased when compared to the prior-year period primarily due to higher royalty costs resulting from higher gold prices and lower production, partially offset by the benefit of the weaker Canadian dollar
Total Cash Costs per Ounce
- Third Quarter and First Nine Months of 2025 – Total cash costs per ounce increased when compared to the prior-year periods primarily due to the reasons described above for the increase in production costs per ounce in the respective period
AISC per Ounce
- Third Quarter of 2025 – AISC per ounce increased when compared to the prior-year period due to the reasons described above for the increase in total cash costs per ounce and higher general and administrative expenses (higher stock-based compensation as a result of the appreciation of the share price), partially offset by lower sustaining capital expenditures, primarily at Detour Lake
- First Nine Months of 2025 – AISC per ounce increased when compared to the prior-year period due to the reasons described above for the increase in total cash costs per ounce, higher sustaining capital expenditures, primarily at Meadowbank and Fosterville , and higher general and administrative expenses (higher stock-based compensation as a result of the appreciation of the share price)
Refer to the Company's Management Discussion and Analysis for the third quarter of 2025 (the "MD&A") under the caption "Financial and Operating Results" for additional variance analysis on gold production, production costs, minesite costs per tonne and total cash costs per ounce compared to the prior-year periods.
Third Quarter 2025 Financial Results
| Financial Results Summary |  |  |  |  |  |  |  |  | 
|  |  | Three Months Ended September 30, |  | Nine Months Ended September 30, | ||||
|  |  | 2025 |  | 2024 |  | 2025 |  | 2024 | 
| Realized gold price (per ounce)6 |  | $ 3,476 |  | $ 2,492 |  | $ 3,221 |  | $ 2,297 | 
| Net income (millions) |  | $ 1,055 |  | $ 567 |  | $ 2,938 |  | $ 1,386 | 
| Adjusted net income (millions) |  | $ 1,085 |  | $ 573 |  | $ 2,831 |  | $ 1,485 | 
| EBITDA (millions)7 |  | $ 2,030 |  | $ 1,259 |  | $ 5,684 |  | $ 3,264 | 
| Adjusted EBITDA (millions)7 |  | $ 2,098 |  | $ 1,257 |  | $ 5,602 |  | $ 3,362 | 
| Cash provided by operating activities (millions) |  | $ 1,816 |  | $ 1,085 |  | $ 4,706 |  | $ 2,829 | 
| Cash provided by operating activities before changes in non-cash working capital balances (millions) |  | $ 1,661 |  | $ 1,027 |  | $ 4,203 |  | $ 2,791 | 
| Capital expenditures (millions)8 |  | $ 644 |  | $ 486 |  | $ 1,601 |  | $ 1,265 | 
| Free cash flow (millions) |  | $ 1,190 |  | $ 620 |  | $ 3,089 |  | $ 1,573 | 
| Free cash flow before changes in non-cash working capital balances (millions) |  | $ 1,035 |  | $ 563 |  | $ 2,586 |  | $ 1,535 | 
|  |  |  |  |  |  |  |  |  | 
| Net income per share (basic) |  | $ 2.10 |  | $ 1.13 |  | $ 5.85 |  | $ 2.78 | 
| Adjusted net income per share (basic) |  | $ 2.16 |  | $ 1.14 |  | $ 5.64 |  | $ 2.97 | 
| Cash provided by operating activities per share (basic) |  | $ 3.62 |  | $ 2.16 |  | $ 9.37 |  | $ 5.67 | 
| Cash provided by operating activities before changes in non-cash working capital balances per share (basic) |  | $ 3.31 |  | $ 2.05 |  | $ 8.37 |  | $ 5.59 | 
| Free cash flow per share (basic) |  | $ 2.37 |  | $ 1.24 |  | $ 6.15 |  | $ 3.15 | 
| Free cash flow before changes in non-cash working capital balances per share (basic) |  | $ 2.06 |  | $ 1.12 |  | $ 5.15 |  | $ 3.07 | 
| ____________________________ | 
| 6 Realized gold price is calculated as gold revenues from mining operations divided by the number of ounces sold. | 
| 7 "EBITDA" means earnings before interest, taxes, depreciation, and amortization. EBITDA and adjusted EBITDA are non-GAAP measures that are not standardized financial measures under IFRS Accounting Standards. For a description of the composition and usefulness of these non-GAAP measures and a reconciliation to net income see "Note Regarding Certain Measures of Performance" below. | 
| 8 Includes capitalized exploration. Capital expenditures is a non-GAAP measure that is not a standardized financial measure under IFRS Accounting Standards. For a discussion of the composition and usefulness of this non-GAAP measure and a reconciliation to additions to property, plant and mine development as set out in the consolidated statements of cash flows, see "Note Regarding Certain Measures of Performance" below. | 
Net Income
- Third Quarter of 2025- Net income increased when compared to the prior-year period primarily due to record operating margins resulting from higher realized gold prices, partially offset by higher income and mining taxes, higher amortization of property, plant and mine development and losses on derivative financial instruments (compared to gains in the prior-year period)
- During the third quarter of 2025, the Company sold 38,002,589 common shares of Orla Mining Ltd. at a price of C per common share for total consideration of$14.75 C ($560 million $405 million $271 million $34 million 
- Net income of $1,055 million $2.10 $40 million $0.08 $20 million $0.04 $7 million $0.01 $7 million $0.01 $4 million $0.01 $6 million $0.01 $1,085 million $2.16 
 
- First Nine Months of 2025 – Net income increased when compared to the prior-year period primarily due to record operating margins resulting from higher realized gold prices and gains on derivative financial instruments (compared to losses in the prior-year period), partially offset by higher income and mining taxes and higher amortization of property, plant and mine development in the current period
Adjusted EBITDA
- Third Quarter of 2025 – Adjusted EBITDA increased when compared to the prior-year period primarily due to higher revenues from mining operations (higher realized gold prices and higher gold sales), partially offset by higher production costs (higher royalty costs) and higher general and administrative expenses (higher stock-based compensation as a result of the appreciation of the share price)
- First Nine Months of 2025 – Adjusted EBITDA increased when compared to the prior-year period primarily due to higher revenues from mining operations (higher realized gold prices), partially offset by lower gold sales, higher production costs (higher royalty costs) and higher general and administrative expenses (higher stock-based compensation as a result of the appreciation of the share price)
Cash Provided by Operating Activities
- Third Quarter and First Nine Months of 2025 – Cash provided by operating activities and cash provided by operating activities before changes in non-cash working capital balances increased when compared to the prior-year periods primarily due to the reasons described above related to the increases in adjusted EBITDA. Cash provided by operating activities benefited from favourable changes in non-cash working capital balances, primarily due to an increase in the accrued taxes payable as a result of higher operating margins
Free Cash Flow Before Changes in Non-cash Working Capital Balances
- Third Quarter and First Nine Months of 2025 – Free cash flow before changes in non-cash working capital balances was a record and increased when compared to the prior-year periods due to the reasons described above related to cash provided by operating activities, partially offset by higher additions to property, plant and mine development
Capital Expenditures
In the third quarter of 2025, capital expenditures were 
The table below sets out a summary of capital expenditures, in each case broken down between sustaining capital expenditures and development capital expenditures, and capitalized exploration by mine in the third quarter of 2025 and the first nine months of 2025.
| Summary of Capital Expenditures* |  |  |  |  |  |  | |
| (thousands) |  |  |  |  |  |  |  | 
|  | Capital Expenditures** |  | Capitalized Exploration | ||||
|  | 
                          
                            Three Months  |  | 
                          
                            Nine Months  |  | 
                          
                            Three Months  |  | 
                          
                            Nine Months  | 
|  | Sep 30, 2025 |  | Sep 30, 2025 |  | Sep 30, 2025 |  | Sep 30, 2025 | 
| Sustaining Capital Expenditures |  |  |  |  |  |  |  | 
| LaRonde | $ 17,226 |  | $ 55,131 |  | $ 1,080 |  | $ 3,079 | 
| 
                          Canadian  | 34,600 |  | 87,637 |  | 305 |  | 1,618 | 
| Goldex | 11,461 |  | 37,721 |  | 351 |  | 1,523 | 
| 
                           | 63,287 |  | 180,489 |  | 1,736 |  | 6,220 | 
| Detour Lake | 59,473 |  | 159,072 |  | — |  | — | 
| Macassa | 13,391 |  | 32,121 |  | 288 |  | 1,035 | 
| 
                           | 72,864 |  | 191,193 |  | 288 |  | 1,035 | 
| Meliadine | 22,734 |  | 53,203 |  | 2,541 |  | 4,574 | 
| Meadowbank | 40,104 |  | 97,632 |  | — |  | — | 
| 
                           | 62,838 |  | 150,835 |  | 2,541 |  | 4,574 | 
| 
                           | 16,000 |  | 44,615 |  | — |  | — | 
| 
                           | 16,000 |  | 44,615 |  | — |  | — | 
| Kittila | 16,303 |  | 45,302 |  | 793 |  | 2,402 | 
| 
                           | 16,303 |  | 45,302 |  | 793 |  | 2,402 | 
| 
                           | 7,216 |  | 23,560 |  | 676 |  | 1,528 | 
| 
                           | 7,216 |  | 23,560 |  | 676 |  | 1,528 | 
| Other | 2,111 |  | 6,301 |  | 339 |  | 576 | 
| Total Sustaining Capital Expenditures | $ 240,619 |  | $ 642,295 |  | $ 6,373 |  | $ 16,335 | 
|  |  |  |  |  |  |  |  | 
| Development Capital Expenditures |  |  |  |  |  |  |  | 
| LaRonde | $ 18,939 |  | $ 54,021 |  | $ — |  | $ 11 | 
| 
                          Canadian  | 78,866 |  | 197,827 |  | 6,983 |  | 19,789 | 
| Goldex | 5,538 |  | 11,169 |  | 1,174 |  | 2,249 | 
| 
                           | 103,343 |  | 263,017 |  | 8,157 |  | 22,049 | 
| Detour Lake | 76,300 |  | 188,966 |  | 9,122 |  | 26,518 | 
| Macassa | 23,338 |  | 65,213 |  | 8,752 |  | 27,795 | 
| 
                           | 99,638 |  | 254,179 |  | 17,874 |  | 54,313 | 
| Meliadine | 28,910 |  | 55,361 |  | 3,563 |  | 12,717 | 
| Meadowbank | 12,608 |  | 15,289 |  | — |  | — | 
| 
                           | 41,518 |  | 70,650 |  | 3,563 |  | 12,717 | 
| 
                           | 8,321 |  | 23,094 |  | 2,680 |  | 8,080 | 
| 
                           | 8,321 |  | 23,094 |  | 2,680 |  | 8,080 | 
| Kittila | 409 |  | 346 |  | 1,767 |  | 4,776 | 
| 
                           | 409 |  | 346 |  | 1,767 |  | 4,776 | 
| 
                           | 1,001 |  | 3,917 |  | 9 |  | 32 | 
| 
                           | 2,566 |  | 6,613 |  | — |  | — | 
| 
                           | 3,567 |  | 10,530 |  | 9 |  | 32 | 
| Other | 59,258 |  | 107,108 |  | 46,759 |  | 111,521 | 
| Total Development Capital Expenditures | $ 316,054 |  | $ 728,924 |  | $ 80,809 |  | $ 213,488 | 
| Total Capital Expenditures | $ 556,673 |  | $ 1,371,219 |  | $ 87,182 |  | $ 229,823 | 
| * | Capital expenditures is a non-GAAP measure that is not a standardized financial measure under IFRS Accounting Standards. For a discussion of the composition and usefulness of this non-GAAP measure and a reconciliation to additions to property, plant and mine development as set out in the consolidated statements of cash flows, see "Note Regarding Certain Measures of Performance" below. | 
| ** | Excludes capitalized exploration | 
2025 Guidance Reiterated
In the first nine months of 2025, the Company achieved approximately 
A summary of the Company's guidance is set out below.
| 2025 Guidance Summary |  |  |  |  | 
| (millions, unless otherwise stated) |  |  |  |  | 
|  | 2025 |  | 2025 | |
|  | Range |  | Mid-Point | |
| Gold production (ounces) | 3,300,000 | 3,500,000 |  | 3,400,000 | 
| Total cash costs per ounce | 
                           | 
                           |  | 
                           | 
| AISC per ounce | 
                           | 
                           |  | 
                           | 
|  |  |  |  |  | 
| Exploration and corporate development expense | 
                           | 
                           |  | 
                           | 
| Depreciation and amortization expense | 
                           | 
                           |  | 
                           | 
| General & administrative expense* | 
                           | 
                           |  | 
                           | 
| Other costs | 
                           | 
                           |  | 
                           | 
|  |  |  |  |  | 
| Tax rate (%) | 33 % | 38 % |  | 35 % | 
| Cash taxes | 
                           | 
                           |  | 
                           | 
|  |  |  |  |  | 
| Capital expenditures (excluding capitalized exploration) | 
                           | 
                           |  | 
                           | 
| Capitalized exploration | 
                           | 
                           |  | 
                           | 
| * | General and administrative expense is expected to fluctuate based on changes in the Company's share price, which affect the costs related to stock-based compensation. | 
Tariffs
On February 1, 2025, 
At this time, the Company believes its revenue structure will be largely unaffected by the tariffs as its gold production is mostly refined in 
Strengthened Financial Position Driven by Strong Free Cash Flow and Strategic Debt Reduction
Cash and cash equivalents increased by 
As at September 30, 2025, the Company's total long-term debt was 
On August 26, 2025, Moody's Ratings upgraded the Company's investment grade credit rating to A3 with a Stable Outlook reflecting the Company's strengthening credit profile and conservative financial policies. The Company strives to maintain a strong financial position and an investment grade balance sheet.
The Company increased its net cash position from 
| Net Cash Summary |  |  | ||
| (millions) |  |  |  |  | 
|  |  | As at |  | As at | 
|  |  | Sep 30, 2025 |  | June 30, 2025 | 
| Current portion of long-term debt |  | $ — |  | $ (50) | 
| Non-current portion of long-term debt |  | (196) |  | (545) | 
| Long-term debt |  | $ (196) |  | $ (595) | 
| Cash and cash equivalents |  | 2,355 |  | 1,558 | 
| Net cash (debt) |  | $ 2,159 |  | $ 963 | 
Hedges
The Company's full year 2025 cost guidance is based on assumed exchange rates of 
- Approximately 63% of the remaining estimated Canadian dollar exposure for 2025 is hedged at an average floor price providing protection in respect of exchange rate movements below1.37 C$ /US$, while allowing for participation in respect of exchange rate movements up to an average of1.42 C$ /US$;
- Approximately 32% of the remaining estimated Euro exposure for 2025 is hedged at an average floor price providing protection in respect of exchange rate movements above1.10 US$ /EUR, while allowing for participation in respect of exchange rate movements down to an average of1.07 US$ /EUR;
- Approximately 53% of the remaining estimated Australian dollar exposure for 2025 is hedged at an average floor price providing protection in respect of exchange rate movements below1.50 A$ /US$, while allowing for participation in respect of exchange rate movements up to an average of1.70 A$ /US$; and
- Approximately 45% of the remaining estimated Mexican peso ("MXN") exposure for 2025 is hedged at an average floor price providing protection in respect of exchange rate movements below19.50 MXP /US$, while allowing for participation in respect of exchange rate movements up to an average of24.00 MXP /US$.
With the 2025 sealift purchases at the Company's 
The Company will continue to monitor market conditions and anticipates continuing to opportunistically add to its operating currency and diesel hedges to strategically support its key input costs for the balance of 2025. Current hedging positions are not factored into 2025 or future guidance.
Shareholder Returns
Dividend Record and Payment Dates for the Fourth Quarter of 2025
The Company's Board of Directors has declared a quarterly cash dividend of 
Expected Dividend Record and Payment Dates for the 2025 Fiscal Year
| Record Date | Payment Date | 
| February 28, 2025* | March 14, 2025* | 
| May 30, 2025* | June 16, 2025* | 
| September 2, 2025* | September 15, 2025* | 
| December 1, 2025** | December 15, 2025** | 
| * | Paid | 
| ** | Declared | 
Dividend Reinvestment Plan
For information on the Company's dividend reinvestment plan, see: Dividend Reinvestment Plan.
International Dividend Currency Exchange
For information on the Company's international dividend currency exchange program, please contact Computershare Trust Company of 
Normal Course Issuer Bid
The Company believes that its NCIB is a flexible and complementary tool that, together with the quarterly dividend, is part of the Company's overall capital allocation program and generates value for shareholders. Under the NCIB, the Company is authorized to purchase up to 
Update on Key Value Drivers and Pipeline Projects
                  Canadian 
The Company continues to advance the transition to underground mining with the construction of the Odyssey mine and is working on several opportunities with the goal to potentially grow annual production at Canadian Malartic to one million ounces per year in the 2030s. These opportunities include the potential for (i) a second shaft at Odyssey, (ii) the development of a satellite open pit at Marban and (iii) the development of the Wasamac underground project. Marban and Wasamac are located approximately 12 kilometres and 100 kilometres from the Canadian Malartic mill, respectively.
Odyssey
In the third quarter of 2025, mine development advanced by 4,770 metres, with a focus on the development of the East Gouldie production levels. The breakthrough of the ramp to the mid-shaft loading station at level 102 was completed in the third quarter of 2025, and the main ramp toward shaft bottom progressed to a depth of 1,059 metres as at September 30, 2025.
At East Gouldie, preparatory work, including the installation of the paste distribution infrastructure and essential services, progressed on schedule for the planned production start-up in the second half of 2026. Development of the main ventilation system advanced with the excavation of the main raise ongoing, reaching level 58, where construction of the main exhaust fan rooms began.
Excavation and construction of the first loading station between levels 102 and 114 were completed in July 2025, ahead of schedule. Conventional shaft sinking activities resumed in August, achieving a record monthly average of 2.32 metres per day in September. As at September 30, 2025, the shaft reached a depth of 1,348 metres.
The Company has approved the extension of the shaft #1 by 70 metres to a depth of 1,870 metres, the relocation of the loading station at shaft bottom to level 181 from level 174 and the addition of a loading station at level 146. The engineering for this new layout commenced in the third quarter of 2025 and the excavation of the second loading station is now expected to begin in early 2026. This adjustment is expected to improve operational flexibility and efficiency in the early 2030s, reduce reliance on truck haulage, and further unlock the significant exploration potential at depth.
Construction of key surface infrastructure progressed on schedule and on budget. The shaft ventilation system at the main hoist building was completed and is now being commissioned. Fabrication of the production hoist is underway in 
In exploration drilling at the Odyssey mine and surrounding near-mine exploration properties during the third quarter of 2025, 13 underground rigs and 16 surface rigs drilled a total of 87,891 metres (239,829 metres year-to-date). The drilling program at Odyssey targeted the upper eastern, lower eastern and lower western extensions of the East Gouldie deposit, the new Eclipse zone and portions of the Odyssey deposit near the Odyssey shaft. Regional exploration was focused on the 16-kilometre long land package around the mine, with additional activities conducted on the Marban land package located immediately northeast of the Canadian Malartic property.
Drilling in the upper eastern extension of East Gouldie near the current shaft and ramp infrastructure was highlighted by hole UGEG-075-056 intersecting 4.8 g/t gold over 25.4 metres at 884 metres depth, including 12.0 g/t gold over 7.0 metres at 881 metres depth and hole UGEG-075-054 intersecting 5.5 g/t gold over 15.4 metres at 907 metres depth, including 8.2 g/t gold over 8.0 metres at 905 metres depth.
The Company believes this area of East Gouldie has the potential to add indicated mineral resources and potentially mineral reserves to East Gouldie by year-end. The drilling success should benefit the ramping up of mining operations and provide additional flexibility in mine development at East Gouldie, including a potential second mining area in the upper part of the mine.
Drilling into the lower eastern extension of the East Gouldie deposit beyond the current mineralized envelope was highlighted by hole MEX24-322WBZA intersecting 2.3 g/t gold over 29.9 metres at 1,991 metres depth including 4.0 g/t gold over 11.3 metres at 2,001 metres depth. These results continue to extend East Gouldie at depth and to the east and are expected to contribute additional inferred mineral resources in this portion of the deposit at year-end 2025.
In the lower western extension of East Gouldie approximately 1.5 kilometres west of hole MEX24-322WBZA, hole MEX25-337 intersected 2.0 g/t over 51.8 metres at 1,531 metres depth and hole MEX25-337W intersected 3.3 g/t gold over 21.6 metres at 1,352 metres depth, including 6.2 g/t Au over 7.7 metres at 1,353 metres depth.
In the sub-parallel Eclipse zone approximately 300 metres to the north of East Gouldie, hole MEX25-309WZ returned 3.9 g/t gold over 10.1 metres at 1,057 metres depth, further increasing the confidence in the geological understanding of the zone and its potential to add significant mineral resources near planned mine infrastructure.
Drilling into the Odyssey deposit returned highlights that included: hole MEV25-304 intersecting 3.6 g/t gold over 14.0 metres at 250 metres depth in the shallow eastern extension of the Odyssey South zone; hole UGOD-075-032 intersecting 3.6 g/t gold over 14.3 metres at 810 metres depth and 10.7 g/t gold over 5.3 metres at 822 metres depth in the Odyssey internal zones; and hole UGOD-075-043 intersecting 3.3 g/t gold over 13.3 metres at 943 metres depth in the Odyssey North zone.
Selected recent drill intersections from Odyssey are set out in the composite longitudinal section below and in Appendix A.
[Odyssey – Composite Cross and Longitudinal Section s ]
Marban
As part of the Company's "fill-the-mill" strategy at the Canadian Malartic complex, the Marban property, located immediately northeast of the Canadian Malartic property, was acquired in March 2025 as an advanced exploration project that could potentially support an open pit mining operation similar to the Barnat open pit operation at Canadian Malartic.
Drilling at the Marban project by the Company began in May 2025 with 96 holes totalling 31,000 metres completed at the end of the third quarter. The objective of the program in 2025 is to confirm and extend the Marban gold deposit both within the Marban property and onto Agnico Eagle's adjacent Callahan property to the north, south and east, so that any future pit design will not be constrained by property boundary considerations.
Recent drilling into the eastern extension of historic mineral resources at the Marban pit produced highlights that included: hole MRB25-038 intersecting 3.3 g/t gold over 11.4 metres (core length) at 80 metres depth and 4.1 g/t gold over 3.4 metres (core length) at 165 metres depth; and hole MRB25-030 intersecting 4.3 g/t gold over 5.5 metres at 309 metres depth and 4.6 g/t gold over 10.9 metres at 384 metres depth.
Selected recent drill intersections from Marban are set out in the composite longitudinal section below and in Appendix A.
[ Ma rban – Composite Longitudinal Section ]
Detour Lake
Excavation of the exploration ramp commenced with the first blast completed on July 3, 2025. The exploration ramp advanced by 259 metres and reached a depth of 43 metres as at September 30, 2025. The Company is focused on advancing the ramp toward the West Extension zone, where a bulk sample is planned from domain 54 at Level 200 in the first half of 2027. In the third quarter of 2025, the underground project engineering advanced with emphasis on the electrical distribution, the portal for the conveyor ramp and major surface and underground infrastructure.
Exploration drilling at Detour Lake during the third quarter of 2025 totalled 60,000 metres (162,500 metres year-to-date) of a planned 223,500 metres in 2025, which includes a supplemental budget of 
The drilling into the high-grade corridor in the West Pit zone during the third quarter further defined the high-grade domains that could potentially be mined earlier in the underground project within the larger lower grade envelope and further validated the current geological interpretation of the high-grade corridor.
Highlight hole DLM25-1163 intersected multiple mineralized domains in the high-grade corridor including 17.2 g/t gold over 3.3 metres at 486 metres depth, 2.1 g/t gold over 34.5 metres at 518 metres depth, including 4.0 g/t gold over 10.3 metres at 523 metres depth, 10.2 g/t gold over 2.8 metres at 595 metres depth, 8.0 g/t gold over 15.0 metres at 746 metres depth, including 27.0 g/t gold over 4.7 metres at 750 metres depth, 5.4 g/t gold over 13.2 metres at 783 metres depth and 5.3 g/t gold over 4.7 metres at 806 metres depth.
Approximately 1.6 kilometres west of hole DLM25-1163 and within the high-grade corridor, hole DLM25-1164 intersected 2.7 g/t gold over 55.7 metres at 297 metres depth, including 11.8 g/t gold over 9.0 metres at 313 metres depth, and 4.6 g/t gold over 12.4 metres at 381 metres depth.
Drilling into the West Extension zone in the western portion of current underground mineral resources further confirmed the grades and continuity of mineralization in the western plunge of the deposit, with highlights that included hole DLM25-1179B intersecting 7.4 g/t gold over 26.8 metres at 538 metres depth, including 10.3 g/t gold over 3.1 metres at 526 metres depth and 23.6 g/t gold over 6.3 metres at 542 metres depth; and hole DLM25-1162 intersecting 0.8 g/t gold over 108.6 metres at 575 metres depth.
Selected recent drill intersections from Detour Lake are set out in the composite longitudinal section below and in Appendix A.
[Detour Lake – Composite Longitudinal Section]
Upper Beaver
In the third quarter of 2025, the shaft head frame was completed with the final installation of structural steel and cladding. Rope installation for the winches and service hoist in the hoist room is now complete, the service hoist is ready for commissioning and shaft sinking is scheduled to begin in the fourth quarter of 2025. In the advanced exploration phase, the Company plans to sink the shaft to a depth of 760 metres in the first half of 2027 in order to establish underground drilling platforms and to collect a bulk sample.
At the ramp portal, excavation of the exploration ramp commenced with the first blast completed in July 2025. The exploration ramp advanced by 268 metres and reached a depth of 22 metres as at September 30, 2025. The Company intends to advance the exploration ramp to a depth of 160 metres by the second half of 2026 to collect a bulk sample.
At the water treatment plant, piping and electrical installations are completed, with commissioning also expected in the fourth quarter of 2025.
Hope Bay
In the third quarter of 2025, excavation of the Naartok East exploration ramp at 
During the quarter, the Company advanced site preparations for potential redevelopment. At Doris, the first new camp wing was completed and delivered and the second new wing is in place, with completion expected in the fourth quarter of 2025. At Robert's Bay, the jetty expansion was finalized ahead of the 2025 sealift season. The mill was fully dismantled, with major components readied for shipment. As part of the dismantling of the mill, 2,442 ounces of gold were recovered and sold in the third quarter of 2025. Additional construction equipment and service infrastructure were mobilized and shipped to site.
The technical evaluation for a larger production scenario and detailed engineering advanced during the quarter, with study completion targeted for the first half of 2026, when engineering progress is expected to reach approximately 
Exploration drilling at Hope Bay during the third quarter of 2025 totalled 34,971 metres (103,815 metres year-to-date) with a continued focus on mineral resource expansion and conversion of the Patch 7 zone in the 
Highlights included: HBM25-381 intersecting 16.9 g/t gold over 4.6 metres at 866 metres depth, including 50.0 g/t gold over 0.85 metres at 865 metres depth in one of the deepest intercepts of Patch 7 to date; hole HBM25-364, located 650 metres south of hole HBM25-381, intersecting 12.7 g/t gold over 9.3 metres at 834 metres depth; and hole HBM25-354, located a further 720 metres south of hole HBM25-364, intersecting 10.7 g/t gold over 3.8 metres at 348 metres depth in the southernmost portion of Patch 7, which remains open in this area to the south and at depth.
Drilling into parallel eastern mineralized shear zones within Patch 7 was highlighted by hole HBM25-367 intersecting 6.7 g/t gold over 10.8 metres at 374 metres depth and 8.9 g/t gold over 3.7 metres at 386 metres depth; and hole HBM25-365 intersecting 6.0 g/t gold over 9.8 metres at 486 metres depth.
Selected recent drill intersections from the 
[Madrid Deposit at Hope Bay – Composite Longitudinal Section]
With helicopter-supported drilling completed for the season, land-based exploration drilling at 
San Nicolas Copper Project (50/50 joint venture with Teck Resources Limited)
In the third quarter of 2025, Minas de 
During the quarter, drilling activities also progressed, focusing on condemnation drilling and geological evaluation near the projected mine area.
Third Quarter 2025 Sustainability Highlights
- 
                    Triple Platinum Win for the Arctic Edge podcast – The Company is proud to have released a special podcast series, The Arctic Edge: Stories from Canada's Frontier, focused on stories and interviews that celebrate the unique identity ofNunavut and the broader Canadian North. It explores the region's social, economic and environmental opportunities and responsibilities, highlighting the importance of sustainable change with a goal to inspire a deeper appreciation for the North's rich heritage and its immense potential. In recognition of its excellence in quality, creativity and resourcefulness, the podcast won the following three Platinum MarCom Awards administered by the Association of Marketing and Communication Professionals:- Outstanding podcast production
- Web element: podcast
- Educational podcast series
 
The Company extends its gratitude to its production collaborators as well as the valued guests who generously shared their stories
- 
                    Recipient of the 2025 Silver Helmet Award – The Chamber of Mining of Mexico (CAMIMEX) granted La India the 2025 Silver Helmet Award in the open pit mine category in recognition of its excellence in mine safety standards
- 
                    Launch of the Macassa Mining School – The Macassa Mining School is an in-house training program that provides mentorship from experienced industry professionals and hands-on learning to build technical skills for a career in underground mining. The program was launched in September 2025 with an initial cohort of eight participants (38% identifying as First Nations)
Reorganization of Non-Core Investments in Critical Minerals
The development of critical minerals has emerged as a global priority, one which offers 
The Company believes it is the right time to reorganize these non-core investments under a new entity and has approved the establishment of Avenir Minerals Limited ("Avenir"), which will be a subsidiary of Agnico Eagle. Avenir will be dedicated to evaluating and advancing critical mineral opportunities in the regions in which Agnico Eagle operates, with an initial geographic focus on 
The Company expects to contribute its portfolio of non-gold and non-copper strategic investments, which have a current aggregate market value of approximately 
Avenir is expected to become an independent and self-sustaining entity with a mandate to pursue strategic partnerships and government support to help fund and advance future opportunities.
By formalizing its critical minerals strategy through the establishment of Avenir, the Company aims to realize value from early-stage assets and opportunities. This initiative reflects the Company's disciplined approach to capital allocation while preserving optionality in the long-term potential of critical minerals.
                  
                    ABITIBI REGION, 
Strong Operational Performance Continues to Drive Gold Production; Record Throughput at Goldex for Second Consecutive Quarter
| Abitibi Quebec – Operating Statistics |  |  |  |  |  |  |  |  | 
| Three Months Ended September 30, 2025 |  | LaRonde |  | 
                          
                            Canadian |  | Goldex |  | 
                          
                            Consolidated  | 
| Tonnes of ore milled (thousands) |  | 764 |  | 5,091 |  | 843 |  | 6,698 | 
| Tonnes of ore milled per day |  | 8,304 |  | 55,337 |  | 9,163 |  | 72,804 | 
| Gold grade (g/t) |  | 3.54 |  | 1.05 |  | 1.26 |  | 1.36 | 
| Gold production (ounces) |  | 81,522 |  | 156,875 |  | 29,375 |  | 267,772 | 
| Production costs per tonne (C$) |  | C$ 128 |  | C$ 33 |  | C$ 59 |  | C$ 47 | 
| Minesite costs per tonne (C$)9 |  | C$ 157 |  | C$ 41 |  | C$ 63 |  | C$ 57 | 
| Production costs per ounce |  | $ 868 |  | $ 793 |  | $ 1,224 |  | $ 863 | 
| Total cash costs per ounce |  | $ 926 |  | $ 959 |  | $ 1,076 |  | $ 962 | 
|  |  |  |  |  |  |  |  |  | 
| Nine Months Ended September 30, 2025 |  | LaRonde |  | 
                          
                            Canadian |  | Goldex |  | 
                          
                            Consolidated | 
| Tonnes of ore milled (thousands) |  | 2,113 |  | 14,919 |  | 2,454 |  | 19,486 | 
| Tonnes of ore milled per day |  | 7,740 |  | 54,648 |  | 8,989 |  | 71,377 | 
| Gold grade (g/t) |  | 4.15 |  | 1.11 |  | 1.38 |  | 1.47 | 
| Gold production (ounces) |  | 264,265 |  | 489,179 |  | 92,509 |  | 845,953 | 
| Production costs per tonne (C$) |  | C$ 160 |  | C$ 33 |  | C$ 62 |  | C$ 51 | 
| Minesite costs per tonne (C$) |  | C$ 163 |  | C$ 43 |  | C$ 63 |  | C$ 58 | 
| Production costs per ounce |  | $ 913 |  | $ 734 |  | $ 1,171 |  | $ 838 | 
| Total cash costs per ounce |  | $ 822 |  | $ 919 |  | $ 997 |  | $ 897 | 
See the MD&A under the caption "Financial and Operating Results" for a variance analysis on gold production, production costs, minesite costs per tonne and total cash costs per ounce compared to the prior-year periods.
| ___________________________________________ | 
| 9 Minesite costs per tonne is a non-GAAP measure that is not standardized under IFRS Accounting Standards and is reported on a per tonne of ore milled basis. For a description of the composition and usefulness of this non-GAAP measure and a reconciliation to production costs see "Note Regarding Certain Measures of Performance" below. | 
Regional Highlights
- Gold production in the quarter was higher than planned primarily as a result of higher throughput at the LaRonde mine and higher grades at the Barnat pit at Canadian Malartic. The higher throughput at LaRonde was primarily due to strong underground hauling and hoisting performance at LaRonde and additional tonnage mined and processed from LZ5. The higher gold grades at Canadian Malartic were a result of the continued mining of mineralized zones near historical underground stopes in the Barnat pit that returned higher grades than anticipated
- At LZ5, the Company continued its automation initiatives and achieved its automation targets. Approximately 20% of the ore hauled to surface was moved using automated scoops and trucks, contributing to the strong overall performance of the site at an average of 3,600 tpd, above the production target of 3,500 tpd for the third quarter of 2025
- At Odyssey, total development during the quarter was approximately 4,770 metres, including record development in September of approximately 1,660 metres. Gold production was slightly ahead of plan at approximately 22,400 ounces driven by higher ore mined of approximately 3,634 tpd compared to the target of 3,500 tpd
- At Goldex, record quarterly tonnage was processed for the second consecutive quarter at approximately 844,000 tonnes, driven by record total tonnage processed from Akasaba West
- Canadian Malartic has a planned shutdown of four to five days for regular maintenance at the mill in the fourth quarter of 2025
- An update on Odyssey and the "fill-the-mill" strategy is set out in the Update on Key Value Drivers and Pipeline Projects section above
                  
                    ABITIBI REGION, 
Record Quarterly Mill Throughput at Detour Lake; Higher Grades Drive Strong Production at Macassa
| Abitibi Ontario – Operating Statistics |  |  |  |  |  |  | 
| Three Months Ended September 30, 2025 |  | Detour Lake |  | Macassa |  | 
                          
                            Consolidated  | 
| Tonnes of ore milled (thousands) |  | 7,351 |  | 133 |  | 7,484 | 
| Tonnes of ore milled per day |  | 79,902 |  | 1,446 |  | 81,348 | 
| Gold grade (g/t) |  | 0.82 |  | 18.95 |  | 1.14 | 
| Gold production (ounces) |  | 176,539 |  | 78,832 |  | 255,371 | 
| Production costs per tonne (C$) |  | C$ 28 |  | C$ 510 |  | C$ 37 | 
| Minesite costs per tonne (C$) |  | C$ 28 |  | C$ 547 |  | C$ 37 | 
| Production costs per ounce |  | $ 856 |  | $ 617 |  | $ 783 | 
| Total cash costs per ounce |  | $ 831 |  | $ 659 |  | $ 778 | 
|  |  |  |  |  |  |  | 
| Nine Months Ended September 30, 2025 |  | Detour Lake |  | Macassa |  | 
                          
                            Consolidated  | 
| Tonnes of ore milled (thousands) |  | 20,817 |  | 424 |  | 21,241 | 
| Tonnes of ore milled per day |  | 76,253 |  | 1,553 |  | 77,806 | 
| Gold grade (g/t) |  | 0.83 |  | 18.98 |  | 1.19 | 
| Gold production (ounces) |  | 497,649 |  | 252,224 |  | 749,873 | 
| Production costs per tonne (C$) |  | C$ 29 |  | C$ 484 |  | C$ 38 | 
| Minesite costs per tonne (C$) |  | C$ 30 |  | C$ 537 |  | C$ 40 | 
| Production costs per ounce |  | $ 859 |  | $ 582 |  | $ 766 | 
| Total cash costs per ounce |  | $ 894 |  | $ 643 |  | $ 810 | 
See the MD&A under the caption "Financial and Operating Results" for a variance analysis by minesite on gold production, production costs, minesite costs per tonne and total cash costs per ounce compared to the prior-year periods.
Regional Highlights
- Gold production in the quarter was in line with plan at both Macassa and Detour Lake. At Macassa, gold grades were higher than anticipated as a result of positive grade reconciliation and a change in mine sequencing, offsetting lower mill throughput caused by restriction at the mill from an unplanned downtime of the secondary mill in August 2025. The mill returned to normal operating levels by quarter-end
- At Detour Lake, the mill achieved record quarterly throughput of approximately 79,900 tpd, driven by optimization initiatives and record run-time as no major shutdown was planned in the quarter. The higher throughput offset lower gold grades, which resulted from processing supplemental ore from the low-grade stockpile. The open pit mining rate was affected by slower progress around the historical underground workings, which resulted in lower-than-planned run-of-mine ore tonnes. The grade profile is expected to improve in the fourth quarter of 2025 based on the planned mining sequence
- At Macassa, construction of the new paste plant continued during the third quarter of 2025 and is essentially complete. Operational readiness and testing are ongoing with completion expected in December 2025
- Detour Lake completed a major shutdown of seven days for regular mill maintenance in October 2025. Macassa has scheduled a major shutdown of five days for the primary grinding mill liner replacement, the annual overhaul of the crusher and other regular mill maintenance in the fourth quarter of 2025
- Updates on the Detour Lake underground and Upper Beaver projects are set out in the Update on Key Value Drivers and Pipeline Projects section above
                  
                    
Gold Production Driven by Record Quarterly Tonnes Processed at Meliadine and Meadowbank; Drilling at IVR and Whale Tail Continues to Demonstrate Continuity of High-Grade Mineralization
| 
                          
                            
                               |  |  |  |  |  |  | 
| Three Months Ended September 30, 2025 |  | Meliadine |  | Meadowbank |  | 
                          
                            Consolidated  | 
| Tonnes of ore milled (thousands) |  | 627 |  | 1,177 |  | 1,804 | 
| Tonnes of ore milled per day |  | 6,815 |  | 12,793 |  | 19,608 | 
| Gold grade (g/t) |  | 4.83 |  | 3.96 |  | 4.26 | 
| Gold production (ounces) |  | 93,836 |  | 136,152 |  | 229,988 | 
| Production costs per tonne (C$) |  | C$ 187 |  | C$ 191 |  | C$ 190 | 
| Minesite costs per tonne (C$) |  | C$ 234 |  | C$ 194 |  | C$ 208 | 
| Production costs per ounce |  | $ 913 |  | $ 1,200 |  | $ 1,083 | 
| Total cash costs per ounce |  | $ 1,128 |  | $ 1,192 |  | $ 1,166 | 
|  |  |  |  |  |  |  | 
| Nine Months Ended September 30, 2025 |  | Meliadine |  | Meadowbank |  | 
                          
                            Consolidated  | 
| Tonnes of ore milled (thousands) |  | 1,730 |  | 2,906 |  | 4,636 | 
| Tonnes of ore milled per day |  | 6,337 |  | 11,813 |  | 18,150 | 
| Gold grade (g/t) |  | 5.26 |  | 4.45 |  | 4.75 | 
| Gold production (ounces) |  | 282,611 |  | 378,213 |  | 660,824 | 
| Production costs per tonne (C$) |  | C$ 228 |  | C$ 190 |  | C$ 204 | 
| Minesite costs per tonne (C$) |  | C$ 239 |  | C$ 189 |  | C$ 207 | 
| Production costs per ounce |  | $ 1,000 |  | $ 1,048 |  | $ 1,027 | 
| Total cash costs per ounce |  | $ 1,050 |  | $ 1,036 |  | $ 1,042 | 
See the MD&A under the caption "Financial and Operating Results" for a variance analysis by minesite on gold production, production costs, minesite costs per tonne and total cash costs per ounce compared to the prior-year periods.
Regional Highlights
- Gold production in the quarter was better than planned as a result of record throughput at both the Meliadine and Meadowbank mills, partially offset by lower than expected grades at Meliadine
- At Meliadine, the mill achieved record quarterly throughput of 6,815 tpd as a result of mill optimization initiatives after the completion of the Phase 2 mill expansion. Gold grades were lower in the quarter as a result of stope sequencing and the processing of stockpiles at an average lower grade than planned
- At Meadowbank, the mill achieved record quarterly throughput of 12,793 tpd. The mill throughput during the quarter benefited from additional ore stockpiled in the previous quarter during the mill shutdowns caused by a longer-than-expected caribou migration
- In the fourth quarter of 2025, Meliadine has a four-day scheduled shutdown for regular mill maintenance. Meadowbank has a five-day scheduled major shutdown to replace the SAG and ball mill liners and complete other regular mill maintenance
- An update on Hope Bay is set out in the Update on Key Value Drivers and Pipeline Projects section above
Exploration Highlights at Amaruq
- Exploration drilling totalling 80 holes (28,747 metres) was completed at Amaruq during 2024 and the first three quarters of 2025 to confirm and extend mineral resources near surface at the IVR Zone and at depth in the IVR and Whale Tail zones as part of the evaluation of mining scenarios that could potentially extend the life of mine at Amaruq at relatively low geological risk and low capital outlay
- At shallow depth in the IVR Zone, drilling was completed mostly within the IVR pit footprint to potentially add mineral reserves and mineral resources and investigate a pit pushback that could potentially extend the life of mine. Highlights included hole AMQ24-3190 intersecting 21.0 g/t gold over 4.3 metres at 172 metres depth and hole AMQ24-3191 intersecting 14.8 g/t gold over 5.6 metres at 177 metres depth
- In the deep extensions of the IVR Zone below current mineral resources, the drilling had the objective of potentially adding mineral resources at depth, with highlights that included hole AMQ24-3105A intersecting 9.2 g/t gold over 7.5 metres at 826 metres depth and hole AMQ24-3091B intersecting 6.0 g/t gold over 16.2 metres at 873 metres depth, including 10.2 g/t gold over 4.9 metres at 879 metres depth
- The deep drilling of the Whale Tail Zone had the objective of converting inferred mineral resources and adding inferred mineral resources at greater depths, where the zone remains open laterally and at depth. Highlights included: conversion hole AMQ25-3221B intersecting 12.8 g/t gold over 4.1 metres at 547 metres depth and 4.5 g/t gold over 6.2 metres at 620 metres depth; and, below current mineral resources, hole AMQ25-3215B intersecting 8.4 g/t gold over 7.9 metres at 774 metres depth and hole AMQ24-3157 intersecting 11.8 g/t gold over 4.6 metres at 890 metres depth
- The recent conversion and exploration drilling completed at the IVR and Whale Tail zones has demonstrated the grade and thickness continuity of high-grade mineralization at both shallow and underground depths and improved confidence in the geological model of both zones. The Company anticipates adding mineral reserves at shallow depths and mineral resources at shallow and underground depths in these areas at year-end 2025, and will provide an update on potential mine-life extension for the Amaruq mine in the first quarter of 2026
Selected drill intersections from the Amaruq deposit from 2024 and 2025 are set out in the composite longitudinal section below and in Appendix A.
[ Amaruq – Composite Longitudinal Section]
                  
                    
Quarterly Gold Production on Target; Primary Fans Transition to Underground Substantially Complete
| 
                          
                            
                               |  | 
                          
                            Three Months Ended |  | 
                          
                            Nine Months Ended | 
| Tonnes of ore milled (thousands) |  | 198 |  | 549 | 
| Tonnes of ore milled per day |  | 2,152 |  | 2,011 | 
| Gold grade (g/t) |  | 5.76 |  | 7.56 | 
| Gold production (ounces) |  | 34,966 |  | 128,155 | 
| Production costs per tonne (A$) |  | A$ 295 |  | A$ 307 | 
| Minesite costs per tonne (A$) |  | A$ 289 |  | A$ 315 | 
| Production costs per ounce |  | $ 1,088 |  | $ 851 | 
| Total cash costs per ounce |  | $ 1,066 |  | $ 870 | 
See the MD&A under the caption "Financial and Operating Results" for a variance analysis by minesite on gold production, production costs, minesite costs per tonne and total cash costs per ounce compared to the prior-year periods.
Highlights
- Gold production for the quarter was in line with plan, with gold grades aligning with annual guidance following stronger than expected performance in the first half of the year
- The Company is implementing an upgrade of the primary ventilation system to sustain the mining rate in the Lower Phoenix zones in future years. Construction and equipment installation progressed in the main fan chambers, with civil works completed and major components installed and electrical work underway. Equipment installation and commissioning is expected to be completed in the first quarter of 2026
- Fosterville has scheduled a five-day shutdown for regular mill maintenance in the fourth quarter of 2025
                  
                    
Three Million Ounce Milestone Achieved with Strong Quarterly Gold Production; Optimization Initiatives Continue to Realize Cost Benefits
| Kittila – Operating Statistics |  | 
                          
                            Three Months Ended |  | 
                          
                            Nine Months Ended | 
| Tonnes of ore milled (thousands) |  | 558 |  | 1,562 | 
| Tonnes of ore milled per day |  | 6,065 |  | 5,722 | 
| Gold grade (g/t) |  | 3.91 |  | 3.91 | 
| Gold production (ounces) |  | 57,954 |  | 162,415 | 
| Production costs per tonne (€) |  | € 95 |  | € 99 | 
| Minesite costs per tonne (€) |  | € 94 |  | € 99 | 
| Production costs per ounce |  | $ 1,066 |  | $ 1,063 | 
| Total cash costs per ounce |  | $ 1,036 |  | $ 1,058 | 
See the MD&A under the caption "Financial and Operating Results" for a variance analysis by minesite on gold production, production costs, minesite costs per tonne and total cash costs per ounce compared to the prior-year periods.
Highlights
- Gold production in the quarter was in line with plan, with higher mill throughput driven by improved mill runtime and strong mine performance, offsetting the lower gold grades. The mine continues to realize productivity gains through sustained improvement efforts over the past year. Lower gold grades reflect slight adjustment to the mining sequence
- Minesite costs per tonne continue to improve as the benefits of continuous improvement initiatives are realized. Minesite costs per tonne in the first nine months of 2025 decreased by approximately 6% , from€105 t o€99 per tonne, when compared to the prior-year period. This decrease was achieved despite the increase in royalty costs per tonne of approximately€2 due to higher gold prices in the first nine months of 2025 compared to the prior-year period
                  
                    
Gold Production in Line with Target, Driven by Solid Underground Performance at Cubiro
| 
                          
                            
                               |  | 
                          
                            Three Months Ended |  | 
                          
                            Nine Months Ended | 
| Tonnes of ore milled (thousands) |  | 431 |  | 1,252 | 
| Tonnes of ore milled per day |  | 4,685 |  | 4,586 | 
| Gold grade (g/t) |  | 1.57 |  | 1.55 | 
| Gold production (ounces) |  | 20,885 |  | 59,539 | 
| Production costs per tonne |  | $ 129 |  | $ 119 | 
| Minesite costs per tonne |  | $ 123 |  | $ 120 | 
| Production costs per ounce |  | $ 2,655 |  | $ 2,498 | 
| Total cash costs per ounce |  | $ 1,906 |  | $ 2,017 | 
See the MD&A under the caption "Financial and Operating Results" for a variance analysis by minesite on gold production, production costs, minesite costs per tonne and total cash costs per ounce compared to the prior-year periods.
About Agnico Eagle
Canadian-based and led, Agnico Eagle is 
About this News Release
Unless otherwise stated, references to "Canadian Malartic", "Goldex", "LaRonde" and "Meadowbank" are to the Company's operations at the Canadian Malartic complex, the Goldex complex, the LaRonde complex and the Meadowbank complex, respectively. The Canadian Malartic complex consists of the mining, milling and processing operations at the Canadian Malartic mine and the mining operations at the Odyssey mine. The Goldex complex consists of the mining, milling and processing operations at the Goldex mine and the mining operations at the Akasaba West open pit mine. The LaRonde complex consists of the mining, milling and processing operations at the LaRonde mine and the mining operations at the LaRonde Zone 5 mine. The Meadowbank complex consists of the milling and processing operations at the Meadowbank mine and the mining operations at the Amaruq open pit and underground mines. References to other operations are to the relevant mines, projects or properties, as applicable.
When used in this news release, the terms "including" and "such as" mean including and such as, without limitation.
The information contained on any website linked to or referred to herein (including the Company's website) is not part of this news release.
Note Regarding Certain Measures of Performance
This news release discloses certain financial performance measures and ratios, including "total cash costs per ounce", "minesite costs per tonne", "all-in sustaining costs per ounce" (or "AISC per ounce"), "adjusted net income", "adjusted net income per share", "cash provided by operating activities before changes in non-cash components of working capital", "cash provided by operating activities before changes in non-cash components of working capital per share", "EBITDA" which means earnings before interest, taxes, depreciation and amortization, "adjusted EBITDA", "free cash flow", "free cash flow before changes in non-cash components of working capital", "operating margin", "sustaining capital expenditures", "development capital expenditures", "sustaining capitalized exploration", "development capitalized exploration" and "net cash (debt)", as well as, for certain of these measures their related per share ratios that are not standardized measures under IFRS Accounting Standards. These measures and ratios may not be comparable to similar measures and ratios reported by other gold producers and should be considered together with other data prepared in accordance with IFRS Accounting Standards. See below for a reconciliation of these measures to the most directly comparable financial information reported in the condensed interim consolidated financial statements prepared in accordance with IFRS Accounting Standards.
Total cash costs per ounce and minesite costs per tonne
Total cash costs per ounce is calculated on a per ounce of gold produced basis and is reported on both a by-product basis (deducting by-product metal revenues from production costs) and a co-product basis (without deducting by-product metal revenues). Total cash costs per ounce on a by-product basis is calculated by adjusting production costs as recorded in the condensed interim consolidated statements of income for by-product revenues, inventory production costs, the impact of purchase price allocation in connection with mergers and acquisitions on inventory accounting, realized gains and losses on hedges of production costs and other adjustments, which include the costs associated with a 
Total cash costs per ounce is intended to provide investors with information about the cash-generating capabilities of the Company's mining operations. Management also uses these measures to, and believes they are useful to investors so investors can, understand and monitor the performance of the Company's mining operations. The Company believes that total cash costs per ounce is useful to help investors understand the costs associated with producing gold and the economics of gold mining. As market prices for gold are quoted on a per ounce basis, using the total cash costs per ounce on a by-product basis measure allows management and investors to assess a mine's cash-generating capabilities at various gold prices. Management is aware, and investors should note, that these per ounce measures of performance can be affected by fluctuations in exchange rates and, in the case of total cash costs per ounce on a by-product basis, by-product metal prices. Management compensates for these inherent limitations by using, and investors should also consider using, these measures in conjunction with data prepared in accordance with IFRS Accounting Standards and minesite costs per tonne as these measures are not necessarily indicative of operating costs or cash flow measures prepared in accordance with IFRS Accounting Standards. Management also performs sensitivity analyses in order to quantify the effects of fluctuating metal prices and exchange rates.
Agnico Eagle's primary business is gold production and the focus of its current operations and future development is on maximizing returns from gold production, with other metal production being incidental to the gold production process. Accordingly, all metals other than gold are considered by-products.
Unless otherwise indicated, total cash costs per ounce is reported on a by-product basis. Total cash costs per ounce is reported on a by-product basis because (i) the majority of the Company's revenues are from gold, (ii) the Company mines ore, which contains gold, silver, zinc, copper and other metals, (iii) it is not possible to specifically assign all costs to revenues from the gold, silver, zinc, copper and other metals the Company produces, (iv) it is a method used by management and the Board of Directors to monitor operations, and (v) many other gold producers disclose similar measures on a by-product rather than a co-product basis.
Minesite costs per tonne are calculated by adjusting production costs as recorded in the condensed interim consolidated statements of income for inventory production costs and other adjustments, and then dividing by tonnage of ore processed. As the total cash costs per ounce can be affected by fluctuations in by–product metal prices and foreign exchange rates, management believes that minesite costs per tonne is useful to investors in providing additional information regarding the performance of mining operations, eliminating the impact of varying production levels. Management also uses this measure to determine the economic viability of mining blocks. As each mining block is evaluated based on the net realizable value of each tonne mined, in order to be economically viable the estimated revenue on a per tonne basis must be in excess of the minesite costs per tonne. Management is aware, and investors should note, that this per tonne measure of performance can be affected by fluctuations in processing levels. This inherent limitation may be partially mitigated by using this measure in conjunction with production costs and other data prepared in accordance with IFRS Accounting Standards.
The following table sets out the production costs per minesite for the three and nine months ended September 30, 2025 and September 30, 2024, as presented in the condensed interim consolidated statements of income in accordance with IFRS Accounting Standards.
| Total Production Costs by Mine |  |  |  |  |  |  |  | 
|  | Three Months Ended September 30, |  | Nine Months Ended September 30, | ||||
| 
                          
                            
                              (thousands of  | 2025 |  | 2024 |  | 2025 |  | 2024 | 
| LaRonde mine | $ 46,960 |  | $ 74,244 |  | $ 172,146 |  | $ 193,482 | 
| LZ5 | 23,825 |  | 18,916 |  | 69,017 |  | 58,059 | 
| LaRonde | 70,785 |  | 93,160 |  | 241,163 |  | 251,541 | 
| 
                          Canadian  | 124,353 |  | 128,984 |  | 359,025 |  | 399,893 | 
| Goldex | 35,956 |  | 34,265 |  | 108,302 |  | 100,531 | 
| 
                          
                             | 231,094 |  | 256,409 |  | 708,490 |  | 751,965 | 
| Detour Lake | 151,199 |  | 127,159 |  | 427,475 |  | 379,366 | 
| Macassa | 48,652 |  | 48,086 |  | 146,744 |  | 146,763 | 
| 
                          
                             | 199,851 |  | 175,245 |  | 574,219 |  | 526,129 | 
| Meliadine | 85,662 |  | 75,099 |  | 282,577 |  | 254,463 | 
| Meadowbank | 163,403 |  | 115,705 |  | 396,409 |  | 352,881 | 
| 
                          
                             | 249,065 |  | 190,804 |  | 678,986 |  | 607,344 | 
| 
                           | 38,036 |  | 44,346 |  | 109,094 |  | 114,824 | 
| 
                          
                             | 38,036 |  | 44,346 |  | 109,094 |  | 114,824 | 
| Kittila | 61,762 |  | 59,968 |  | 172,659 |  | 176,535 | 
| 
                          
                             | 61,762 |  | 59,968 |  | 172,659 |  | 176,535 | 
| 
                           | 55,443 |  | 46,464 |  | 148,723 |  | 122,980 | 
| 
                          La  | — |  | 10,417 |  | — |  | 39,445 | 
| 
                          
                             | 55,443 |  | 56,881 |  | 148,723 |  | 162,425 | 
|  |  |  |  |  |  |  |  | 
| Corporate and Other | 4,070 |  | — |  | 4,070 |  | — | 
|  |  |  |  |  |  |  |  | 
| Production costs per the condensed interim consolidated statements of income | $ 839,321 |  | $ 783,653 |  | 
                          
                             |  | 
                          
                             | 
The following tables set out a reconciliation of total cash costs per ounce (on both a by-product basis and co-product basis) and minesite costs per tonne to production costs for the three and nine months ended September 30, 2025 and September 30, 2024, exclusive of amortization, as presented in the condensed interim consolidated statements of income in accordance with IFRS Accounting Standards.
| Reconciliation of Production Costs to Total Cash Costs per Ounce by Mine | ||||||||||
|  |  |  |  |  |  |  |  |  |  |  | 
| Three Months Ended September 30, 2025 |  |  |  |  |  |  | ||||
| (thousands, except as noted) |  |  |  |  |  | |||||
| Mine | Payable gold production (ounces)(i) | Production costs ($) | Production costs per ounce ($) | Inventory adjustments ($)(ii) | Realized gains and losses on hedges ($) | In-kind royalty ($)(iii) | Smelting, refining and marketing charges ($) | Total cash costs per ounce (co-product basis) ($) | By-product metal revenues ($) | Total cash costs per ounce (by-product basis) ($) | 
| LaRonde mine | 59,172 | 46,960 | 794 | 19,432 | (41) | — | 2,316 | 1,160 | (19,003) | 839 | 
| LZ5 | 22,350 | 23,825 | 1,066 | 1,617 | (16) | — | 826 | 1,175 | (395) | 1,157 | 
| LaRonde | 81,522 | 70,785 | 868 | 21,049 | (57) | — | 3,142 | 1,164 | (19,398) | 926 | 
| 
                          Canadian  | 156,875 | 124,353 | 793 | 1,470 | (306) | 28,025 | 6 | 979 | (3,151) | 959 | 
| Goldex | 29,375 | 35,956 | 1,224 | 2,732 | (24) | — | 1,018 | 1,351 | (8,072) | 1,076 | 
| 
                          
                             | 267,772 | 231,094 | 863 | 25,251 | (387) | 28,025 | 4,166 | 1,076 | (30,621) | 962 | 
| Detour Lake | 176,539 | 151,199 | 856 | (15,420) | (431) | 12,183 | 1,384 | 844 | (2,205) | 831 | 
| Macassa | 78,832 | 48,652 | 617 | (184) | (57) | 3,878 | 110 | 665 | (487) | 659 | 
| 
                          
                             | 255,371 | 199,851 | 783 | (15,604) | (488) | 16,061 | 1,494 | 788 | (2,692) | 778 | 
| Meliadine | 93,836 | 85,662 | 913 | 20,706 | (270) | — | (126) | 1,129 | (158) | 1,128 | 
| Meadowbank | 136,152 | 163,403 | 1,200 | 1,638 | (389) | — | 99 | 1,210 | (2,401) | 1,192 | 
| 
                          
                             | 229,988 | 249,065 | 1,083 | 22,344 | (659) | — | (27) | 1,177 | (2,559) | 1,166 | 
| 
                           | 34,966 | 38,036 | 1,088 | (597) | (28) | — | 29 | 1,071 | (158) | 1,066 | 
| 
                          
                             | 34,966 | 38,036 | 1,088 | (597) | (28) | — | 29 | 1,071 | (158) | 1,066 | 
| Kittila | 57,954 | 61,762 | 1,066 | (415) | (1,127) | — | (40) | 1,038 | (139) | 1,036 | 
| 
                          
                             | 57,954 | 61,762 | 1,066 | (415) | (1,127) | — | (40) | 1,038 | (139) | 1,036 | 
| 
                           | 20,885 | 55,443 | 2,655 | (1,704) | (560) | — | 326 | 2,562 | (13,691) | 1,906 | 
| 
                          
                             | 20,885 | 55,443 | 2,655 | (1,704) | (560) | — | 326 | 2,562 | (13,691) | 1,906 | 
|  |  |  |  |  |  |  |  |  |  |  | 
| Corporate and Other(iv) | — | 4,070 | — | (4,070) | — | — | — | — | — | — | 
|  |  |  |  |  |  |  |  |  |  |  | 
| Consolidated | 866,936 | 839,321 | 963 | 25,205 | (3,249) | 44,086 | 5,948 | 1,051 | (49,860) | 994 | 
|  |  |  |  |  |  |  |  |  |  |  | 
| Notes: | |
| (i) | Gold production for the three months ended September 30, 2025 excludes 945 ounces of payable production of gold at La India and 189 ounces of payable production of gold at Creston Mascota, which were produced from residual leaching as well as 2,442 ounces of gold recovered at Hope Bay. | 
| (ii) | 
                          Under the Company's revenue recognition policy, revenue from contracts with customers is recognized upon the transfer of control over metals sold to the customer. As the total cash costs per ounce are calculated on a production basis, an inventory adjustment is made to reflect the portion of production not yet recognized as revenue. Included in inventory adjustments for Canadian Malartic for the three months ended September 30, 2025 is  | 
| (iii) | 
                          Relates to costs associated with a  | 
| (iv) | Relates to production costs associated with gold sold by non-operating minesites that are excluded from the consolidated cash costs calculation. | 
| Three Months Ended September 30, 2024 |  |  |  |  |  |  | ||||
| (thousands, except as noted) |  |  |  |  |  | |||||
| Mine | Payable gold production (ounces) | Production costs ($) | Production costs per ounce ($) | Inventory adjustments ($)(i) | Realized gains and losses on hedges ($) | In-kind royalty ($)(ii) | Smelting, refining and marketing charges ($) | Total cash costs per ounce (co-product basis) ($) | By-product metal revenues ($) | Total cash costs per ounce (by-product basis) ($) | 
| LaRonde mine | 47,313 | 74,244 | 1,569 | (14,425) | 246 | — | 1,015 | 1,291 | (10,097) | 1,078 | 
| LZ5 | 18,292 | 18,916 | 1,034 | 3,752 | 86 | — | 1,030 | 1,300 | (274) | 1,285 | 
| LaRonde | 65,605 | 93,160 | 1,420 | (10,673) | 332 | — | 2,045 | 1,294 | (10,371) | 1,135 | 
| 
                          Canadian  | 141,392 | 128,984 | 912 | (2,590) | 997 | 18,810 | 459 | 1,037 | (1,777) | 1,025 | 
| Goldex | 30,334 | 34,265 | 1,130 | (1,161) | 148 | — | 762 | 1,121 | (2,743) | 1,031 | 
| 
                          
                             | 237,331 | 256,409 | 1,080 | (14,424) | 1,477 | 18,810 | 3,266 | 1,119 | (14,891) | 1,056 | 
| Detour Lake | 173,891 | 127,159 | 731 | (2,726) | 1,247 | 8,752 | 1,974 | 784 | (757) | 779 | 
| Macassa | 70,727 | 48,086 | 680 | 2,568 | 304 | 2,460 | 103 | 757 | (442) | 750 | 
| 
                          
                             | 244,618 | 175,245 | 716 | (158) | 1,551 | 11,212 | 2,077 | 776 | (1,199) | 772 | 
| Meliadine | 99,838 | 75,099 | 752 | 13,212 | 505 | — | 65 | 890 | (135) | 889 | 
| Meadowbank | 133,502 | 115,705 | 867 | 6,117 | 681 | — | (1) | 918 | (978) | 910 | 
| 
                          
                             | 233,340 | 190,804 | 818 | 19,329 | 1,186 | — | 64 | 906 | (1,113) | 901 | 
| 
                           | 65,532 | 44,346 | 677 | (1,523) | (80) | — | 23 | 653 | (135) | 651 | 
| 
                          
                             | 65,532 | 44,346 | 677 | (1,523) | (80) | — | 23 | 653 | (135) | 651 | 
| Kittila | 56,715 | 59,968 | 1,057 | (2,410) | (157) | — | (41) | 1,011 | (102) | 1,010 | 
| 
                          
                             | 56,715 | 59,968 | 1,057 | (2,410) | (157) | — | (41) | 1,011 | (102) | 1,010 | 
| 
                           | 21,371 | 46,464 | 2,174 | (3,548) | — | — | 317 | 2,023 | (10,517) | 1,531 | 
| Creston Mascota | 9 | — | — | — | — | — | — | — | — | — | 
| 
                          La  | 4,529 | 10,417 | 2,300 | 2,633 | — | — | 91 | 2,902 | (133) | 2,872 | 
| 
                          
                             | 25,909 | 56,881 | 2,195 | (915) | — | — | 408 | 2,176 | (10,650) | 1,765 | 
|  |  |  |  |  |  |  |  |  |  |  | 
| Consolidated | 863,445 | 783,653 | 908 | (101) | 3,977 | 30,022 | 5,797 | 953 | (28,090) | 921 | 
|  |  |  |  |  |  |  |  |  |  |  | 
| Notes: | |
| (i) | Under the Company's revenue recognition policy, revenue from contracts with customers is recognized upon the transfer of control over metals sold to the customer. As the total cash costs per ounce are calculated on a production basis, an inventory adjustment is made to reflect the portion of production not yet recognized as revenue. | 
| (ii) | 
                          Relates to costs associated with a  | 
| Nine Months Ended September 30, 2025 |  |  |  |  |  | |||||
| (thousands, except as noted) |  |  |  |  |  | |||||
| Mine | Payable gold production (ounces)(i) | Production costs ($) | Production costs per ounce ($) | Inventory adjustments ($)(ii) | Realized (gains) and losses on hedges ($) | In-kind royalty ($)(iii) | Smelting, refining and marketing charges ($) | Total cash costs per ounce (co-product basis) ($) | By-product metal revenues ($) | Total cash costs per ounce (by-product basis) ($) | 
| LaRonde mine | 201,319 | 172,146 | 855 | 18,275 | 536 | — | 7,035 | 983 | (52,124) | 725 | 
| LZ5 | 62,946 | 69,017 | 1,096 | 485 | 196 | — | 2,637 | 1,149 | (855) | 1,136 | 
| LaRonde | 264,265 | 241,163 | 913 | 18,760 | 732 | — | 9,672 | 1,023 | (52,979) | 822 | 
| 
                          Canadian  | 489,179 | 359,025 | 734 | 17,706 | 988 | 79,745 | 843 | 937 | (8,680) | 919 | 
| Goldex | 92,509 | 108,302 | 1,171 | 2,418 | 308 | — | 3,139 | 1,234 | (21,914) | 997 | 
| 
                          
                             | 845,953 | 708,490 | 838 | 38,884 | 2,028 | 79,745 | 13,654 | 996 | (83,573) | 897 | 
| Detour Lake | 497,649 | 427,475 | 859 | (13,355) | 646 | 30,266 | 4,384 | 903 | (4,324) | 894 | 
| Macassa | 252,224 | 146,744 | 582 | 4,591 | 737 | 11,488 | 271 | 650 | (1,662) | 643 | 
| 
                          
                             | 749,873 | 574,219 | 766 | (8,764) | 1,383 | 41,754 | 4,655 | 818 | (5,986) | 810 | 
| Meliadine | 282,611 | 282,577 | 1,000 | 14,310 | 728 | — | 102 | 1,053 | (855) | 1,050 | 
| Meadowbank | 378,213 | 396,409 | 1,048 | (1,373) | 915 | — | 398 | 1,048 | (4,533) | 1,036 | 
| 
                          
                             | 660,824 | 678,986 | 1,027 | 12,937 | 1,643 | — | 500 | 1,050 | (5,388) | 1,042 | 
| 
                           | 128,155 | 109,094 | 851 | 2,824 | (28) | — | 82 | 874 | (428) | 870 | 
| 
                          
                             | 128,155 | 109,094 | 851 | 2,824 | (28) | — | 82 | 874 | (428) | 870 | 
| Kittila | 162,415 | 172,659 | 1,063 | 1,388 | (1,558) | — | (159) | 1,061 | (433) | 1,058 | 
| 
                          
                             | 162,415 | 172,659 | 1,063 | 1,388 | (1,558) | — | (159) | 1,061 | (433) | 1,058 | 
| 
                           | 59,539 | 148,723 | 2,498 | 1,819 | (531) | — | 894 | 2,535 | (30,814) | 2,017 | 
| 
                          
                             | 59,539 | 148,723 | 2,498 | 1,819 | (531) | — | 894 | 2,535 | (30,814) | 2,017 | 
|  |  |  |  |  |  |  |  |  |  |  | 
| Corporate and Other(iv) | — | 4,070 | — | (4,070) | — | — | — | — | — | — | 
|  |  |  |  |  |  |  |  |  |  |  | 
| Consolidated | 2,606,759 | 2,396,241 | 918 | 45,018 | 2,937 | 121,499 | 19,626 | 992 | (126,622) | 943 | 
|  |  |  |  |  |  |  |  |  |  |  | 
| Notes: | |
| (i) | Gold production for the nine months ended September 30, 2025 excludes 3,614 ounces of payable production of gold at La India and 253 ounces of payable production of gold at Creston Mascota, which were produced from residual leaching as well as 2,442 ounces of gold recovered at Hope Bay. | 
| (ii) | 
                          Under the Company's revenue recognition policy, revenue from contracts with customers is recognized upon the transfer of control over metals sold to the customer. As the total cash costs per ounce are calculated on a production basis, an inventory adjustment is made to reflect the portion of production not yet recognized as revenue. Included in inventory adjustments for Canadian Malartic for the nine months ended September 30, 2025 is  | 
| (iii) | 
                          Relates to costs associated with a  | 
| (iv) | Relates to production costs associated with gold sold by non-operating minesites that are excluded from the consolidated cash costs calculation. | 
| Nine Months Ended September 30, 2024 |  |  |  |  |  |  | ||||
| (thousands, except as noted) |  |  |  |  |  | |||||
| Mine | Payable gold production (ounces) | Production costs ($) | Production costs per ounce ($) | Inventory adjustments ($)(i) | Realized (gains) and losses on hedges ($) | In-kind royalty ($)(ii) | Smelting, refining and marketing charges ($) | Total cash costs per ounce (co-product basis) ($) | By-product metal revenues ($) | Total cash costs per ounce (by-product basis) ($) | 
| LaRonde mine | 161,388 | 193,482 | 1,199 | (12,892) | 616 | — | 9,235 | 1,180 | (39,703) | 934 | 
| LZ5 | 54,915 | 58,059 | 1,057 | 3,820 | 215 | — | 2,396 | 1,174 | (772) | 1,160 | 
| LaRonde | 216,303 | 251,541 | 1,163 | (9,072) | 831 | — | 11,631 | 1,179 | (40,475) | 991 | 
| 
                          Canadian  | 509,169 | 399,893 | 785 | 7,076 | 2,037 | 57,506 | 786 | 918 | (5,945) | 906 | 
| Goldex | 98,472 | 100,531 | 1,021 | (482) | 369 | — | 1,959 | 1,040 | (9,359) | 945 | 
| 
                          
                             | 823,944 | 751,965 | 913 | (2,478) | 3,237 | 57,506 | 14,376 | 1,001 | (55,779) | 933 | 
| Detour Lake | 492,889 | 379,366 | 770 | (7,295) | 2,394 | 22,446 | 5,147 | 816 | (2,003) | 812 | 
| Macassa | 203,048 | 146,763 | 723 | 1,038 | 759 | 6,834 | 242 | 766 | (662) | 763 | 
| 
                          
                             | 695,937 | 526,129 | 756 | (6,257) | 3,153 | 29,280 | 5,389 | 801 | (2,665) | 798 | 
| Meliadine | 284,238 | 254,463 | 895 | 2,457 | 1,612 | — | 100 | 910 | (650) | 908 | 
| Meadowbank | 387,695 | 352,881 | 910 | 5,412 | 2,502 | — | (46) | 930 | (2,952) | 923 | 
| 
                          
                             | 671,933 | 607,344 | 904 | 7,869 | 4,114 | — | 54 | 922 | (3,602) | 916 | 
| 
                           | 188,064 | 114,824 | 611 | (1,277) | 6 | — | 52 | 604 | (462) | 602 | 
| 
                          
                             | 188,064 | 114,824 | 611 | (1,277) | 6 | — | 52 | 604 | (462) | 602 | 
| Kittila | 166,967 | 176,535 | 1,057 | (3,554) | (138) | — | (161) | 1,034 | (289) | 1,032 | 
| 
                          
                             | 166,967 | 176,535 | 1,057 | (3,554) | (138) | — | (161) | 1,034 | (289) | 1,032 | 
| 
                           | 69,850 | 122,980 | 1,761 | 2,235 | — | — | 980 | 1,807 | (26,556) | 1,426 | 
| Creston Mascota | 50 | — | — | — | — | — | — | — | — | — | 
| 
                          La  | 21,190 | 39,445 | 1,861 | 2,780 | — | — | 355 | 2,009 | (991) | 1,963 | 
| 
                          
                             | 91,090 | 162,425 | 1,783 | 5,015 | — | — | 1,335 | 1,853 | (27,547) | 1,550 | 
|  |  |  |  |  |  |  |  |  |  |  | 
| Consolidated | 2,637,935 | 2,339,222 | 887 | (682) | 10,372 | 86,786 | 21,045 | 931 | (90,344) | 897 | 
|  |  |  |  |  |  |  |  |  |  |  | 
| Notes: | |
| (i) | Under the Company's revenue recognition policy, revenue from contracts with customers is recognized upon the transfer of control over metals sold to the customer. As the total cash costs per ounce are calculated on a production basis, an inventory adjustment is made to reflect the portion of production not yet recognized as revenue. | 
| (ii) | 
                          Relates to costs associated with a  | 
| Reconciliation of Production Costs to Minesite Costs per Tonne by Mine | ||||||||
|  |  |  |  |  |  |  |  |  | 
| Three Months Ended September 30, 2025 |  |  |  | |||||
| (thousands, except as noted) |  |  |  | |||||
| Mine | Tonnes of ore milled (thousands) | 
                          Production  | 
                          Production | 
                          Local  | 
                          Inventory | In-kind royalty in 
                           local | Smelting, 
                           refining and local currency | 
                          
                            Local | 
| LaRonde mine | 394 | $ 46,960 | C$ 64,713 | C$ 164 | C$ 26,889 | C$ — | C$ (6,553) | C$ 216 | 
| LZ5 | 370 | $ 23,825 | C$ 32,856 | C$ 89 | C$ 2,241 | C$ — | C$ — | C$ 95 | 
| LaRonde | 764 | $ 70,785 | C$ 97,569 | C$ 128 | C$ 29,130 | C$ — | C$ (6,553) | C$ 157 | 
| 
                          Canadian  | 5,091 | $ 124,353 | 
                          C | C$ 33 | C$ 2,129 | C$ 38,792 | C$ — | C$ 41 | 
| Goldex | 843 | $ 35,956 | C$ 49,637 | C$ 59 | C$ 3,761 | C$ — | C$ — | C$ 63 | 
| 
                          
                             | 6,698 | $ 231,094 | 
                          
                            C | C$ 47 | C$ 35,020 | C$ 38,792 | C$ (6,553) | C$ 57 | 
| Detour Lake | 7,351 | $ 151,199 | 
                          C | C$ 28 | C$ (21,293) | C$ 16,856 | C$ — | C$ 28 | 
| Macassa | 133 | $ 48,652 | C$ 67,786 | C$ 510 | C$ (382) | C$ 5,369 | C$ — | C$ 547 | 
| 
                          
                             | 7,484 | $ 199,851 | 
                          
                            C | C$ 37 | C$ (21,675) | C$ 22,225 | C$ — | C$ 37 | 
| Meliadine | 627 | $ 85,662 | 
                          C | C$ 187 | C$ 29,369 | C$ — | C$ — | C$ 234 | 
| Meadowbank | 1,177 | $ 163,403 | 
                          C | C$ 191 | C$ 2,513 | C$ — | C$ — | C$ 194 | 
| 
                          
                             | 1,804 | $ 249,065 | 
                          
                            C | C$ 190 | C$ 31,882 | C$ — | C$ — | C$ 208 | 
| 
                           | 198 | $ 38,036 | A$ 58,454 | A$ 295 | A$ (1,171) | A$ — | A$ — | A$ 289 | 
| 
                          
                             | 198 | $ 38,036 | A$ 58,454 | A$ 295 | A$ (1,171) | A$ — | A$ — | A$ 289 | 
| Kittila | 558 | $ 61,762 | € 53,023 | € 95 | € (435) | € — | € — | € 94 | 
| 
                          
                             | 558 | $ 61,762 | € 53,023 | € 95 | € (435) | € — | € — | € 94 | 
| 
                           | 431 | $ 55,443 | $ 55,443 | $ 129 | $ (2,264) | $ — | $ — | $ 123 | 
| 
                          
                             | 431 | $ 55,443 | $ 55,443 | $ 129 | $ (2,264) | $ — | $ — | $ 123 | 
|  |  |  |  |  |  |  |  |  | 
| Notes: | |
| (i) | 
                          This inventory adjustment reflects production costs associated with the portion of production still in inventory. Included in inventory adjustments for Canadian Malartic for the three months ended September 30, 2025 is C | 
| (ii) | 
                          Relates to costs associated with a  | 
| Three Months Ended September 30, 2024 |  |  |  | |||||
| (thousands, except as noted) |  |  |  | |||||
| Mine | 
                          Tonnes of | 
                          Production | 
                          Production | 
                          Local  production 
                           costs per | 
                          Inventory | 
                          In-kind | 
                          Smelting,  charges in local currency | 
                          
                            Local | 
| LaRonde mine | 355 | $ 74,244 | 
                          C | C$ 285 | C$ (18,800) | C$ — | C$ (4,419) | C$ 220 | 
| LZ5 | 332 | $ 18,916 | C$ 25,740 | C$ 78 | C$ 5,072 | C$ — | C$ — | C$ 93 | 
| LaRonde | 687 | $ 93,160 | 
                          C | C$ 185 | C$ (13,728) | C$ — | C$ (4,419) | C$ 158 | 
| 
                          Canadian  | 4,862 | $ 128,984 | 
                          C | C$ 36 | C$ (3,655) | C$ 25,677 | C$ — | C$ 41 | 
| Goldex | 739 | $ 34,265 | C$ 46,696 | C$ 63 | C$ (1,619) | C$ — | C$ — | C$ 61 | 
| 
                          
                             | 6,288 | $ 256,409 | 
                          
                            C | C$ 56 | C$ (19,002) | C$ 25,677 | C$ (4,419) | C$ 56 | 
| Detour Lake | 7,082 | $ 127,159 | 
                          C | C$ 24 | C$ (3,935) | C$ 11,914 | C$ — | C$ 26 | 
| Macassa | 134 | $ 48,086 | C$ 65,489 | C$ 489 | C$ 3,408 | C$ 3,348 | C$ — | C$ 539 | 
| 
                          
                             | 7,216 | $ 175,245 | 
                          
                            C | C$ 33 | C$ (527) | C$ 15,262 | C$ — | C$ 35 | 
| Meliadine | 533 | $ 75,099 | 
                          C | C$ 192 | C$ 17,937 | C$ — | C$ — | C$ 226 | 
| Meadowbank | 1,083 | $ 115,705 | 
                          C | C$ 145 | C$ 8,236 | C$ — | C$ — | C$ 153 | 
| 
                          
                             | 1,616 | $ 190,804 | 
                          
                            C | C$ 161 | C$ 26,173 | C$ — | C$ — | C$ 177 | 
| 
                           | 246 | $ 44,346 | A$ 66,587 | A$ 271 | A$ (2,406) | A$ — | A$ — | A$ 261 | 
| 
                          
                             | 246 | $ 44,346 | A$ 66,587 | A$ 271 | A$ (2,406) | A$ — | A$ — | A$ 261 | 
| Kittila | 544 | $ 59,968 | € 54,519 | € 100 | € (2,469) | € — | € — | € 96 | 
| 
                          
                             | 544 | $ 59,968 | € 54,519 | € 100 | € (2,469) | € — | € — | € 96 | 
| 
                           | 446 | $ 46,464 | $ 46,464 | $ 104 | $ (3,548) | $ — | $ — | $ 96 | 
| 
                          La  | — | $ 10,417 | $ 10,417 | $ — | $ (10,417) | $ — | $ — | $ — | 
| 
                          
                             | 446 | $ 56,881 | $ 56,881 | $ 128 | $ (13,965) | $ — | $ — | $ 96 | 
|  |  |  |  |  |  |  |  |  | 
| Notes: | |
| (i) | This inventory adjustment reflects production costs associated with the portion of production still in inventory. | 
| (ii) | 
                          Relates to costs associated with a  | 
| (iii) | 
                          La  | 
| Nine Months Ended September 30, 2025 |  |  |  | |||||
| (thousands, except as noted) |  |  |  | |||||
| Mine | 
                          Tonnes of  | 
                          Production | 
                          Production | 
                          Local  
                           costs per  | Inventory 
                           adjustments | 
                          In-kind 
                           local | 
                          Smelting, local currency | 
                          
                            Local | 
| LaRonde mine | 1,103 | 172,146 | C$ 240,956 | C$ 218 | C$ 25,370 | C$ — | C$ (19,756) | C$ 224 | 
| LZ5 | 1,010 | 69,017 | C$ 96,407 | C$ 95 | C$ 575 | C$ — | C$ — | C$ 96 | 
| LaRonde | 2,113 | 241,163 | C$ 337,363 | C$ 160 | C$ 25,945 | C$ — | C$ (19,756) | C$ 163 | 
| 
                          Canadian  | 14,919 | 359,025 | C$ 498,804 | C$ 33 | C$ 24,333 | 
                          C | C$ — | C$ 43 | 
| Goldex | 2,454 | 108,302 | C$ 151,393 | C$ 62 | C$ 3,196 | C$ — | C$ — | C$ 63 | 
| 
                          
                             | 19,486 | 708,490 | C$ 987,560 | C$ 51 | C$ 53,474 | 
                          
                            C | C$ (19,756) | C$ 58 | 
| Detour Lake | 20,817 | 427,475 | C$ 596,968 | C$ 29 | C$ (18,952) | 
                          C | C$ — | C$ 30 | 
| Macassa | 424 | 146,744 | C$ 205,250 | C$ 484 | C$ 6,264 | 
                          C | C$ — | C$ 537 | 
| 
                          
                             | 21,241 | 574,219 | C$ 802,218 | C$ 38 | C$ (12,688) | 
                          
                            C | C$ — | C$ 40 | 
| Meliadine | 1,730 | 282,577 | C$ 394,138 | C$ 228 | C$ 18,509 | C$ — | C$ — | C$ 239 | 
| Meadowbank | 2,906 | 396,409 | C$ 550,901 | C$ 190 | C$ (2,594) | C$ — | C$ — | C$ 189 | 
| 
                          
                             | 4,636 | 678,986 | C$ 945,039 | C$ 204 | C$ 15,915 | C$ — | C$ — | C$ 207 | 
| 
                           | 549 | 109,094 | 
                          A | A$ 307 | A$ 4,145 | A$ — | A$ — | A$ 315 | 
| 
                          
                             | 549 | 109,094 | 
                          
                            A | A$ 307 | A$ 4,145 | A$ — | A$ — | A$ 315 | 
| Kittila | 1,562 | 172,659 | € 154,529 | € 99 | € 199 | € — | € — | € 99 | 
| 
                          
                             | 1,562 | 172,659 | € 154,529 | € 99 | € 199 | € — | € — | € 99 | 
| 
                           | 1,252 | 148,723 | $ 148,723 | $ 119 | $ 1,288 | $ — | $ — | $ 120 | 
| 
                          
                             | 1,252 | 148,723 | $ 148,723 | $ 119 | $ 1,288 | $ — | $ — | $ 120 | 
|  |  |  |  |  |  |  |  |  | 
| Notes: | |
| (i) | 
                          This inventory adjustment reflects production costs associated with the portion of production still in inventory. Included in inventory adjustments for Canadian Malartic for the nine months ended September 30, 2025 is C | 
| (ii) | 
                          Relates to costs associated with a  | 
| Nine Months Ended September 30, 2024 |  |  |  | |||||
| (thousands, except as noted) |  |  |  | |||||
| Mine | 
                          Tonnes of | 
                          Production  | Production 
                           costs in | 
                          Local  
                           costs per | 
                          Inventory  
                           in local  | 
                          In-kind | 
                          Smelting,  
                           charges in | 
                          
                            Local 
                          
                             minesite | 
| LaRonde mine | 1,149 | 193,482 | C$ 262,638 | C$ 229 | C$ (16,069) | C$ — | C$ (8,019) | C$ 208 | 
| LZ5 | 898 | 58,059 | C$ 78,984 | C$ 88 | C$ 5,192 | C$ — | C$ — | C$ 94 | 
| LaRonde | 2,047 | 251,541 | C$ 341,622 | C$ 167 | C$ (10,877) | C$ — | C$ (8,019) | C$ 158 | 
| 
                          Canadian  | 15,217 | 399,893 | C$ 543,010 | C$ 36 | C$ 9,830 | 
                          C | C$ — | C$ 41 | 
| Goldex | 2,264 | 100,531 | C$ 136,615 | C$ 60 | C$ (580) | C$ — | C$ — | C$ 60 | 
| 
                          
                             | 19,528 | 751,965 | C$ 1,021,247 | C$ 52 | C$ (1,627) | 
                          
                            C | C$ (8,019) | C$ 56 | 
| Detour Lake | 20,376 | 379,366 | C$ 515,371 | C$ 25 | C$ (9,622) | C$ 30,538 | C$ — | C$ 26 | 
| Macassa | 420 | 146,763 | C$ 199,917 | C$ 476 | C$ 1,468 | C$ 9,301 | C$ — | C$ 502 | 
| 
                          
                             | 20,796 | 526,129 | C$ 715,288 | C$ 34 | C$ (8,154) | 
                          
                            C | C$ — | C$ 36 | 
| Meliadine | 1,450 | 254,463 | C$ 345,186 | C$ 238 | C$ 3,724 | C$ — | C$ — | C$ 241 | 
| Meadowbank | 3,144 | 352,881 | C$ 478,366 | C$ 152 | C$ 7,470 | C$ — | C$ — | C$ 155 | 
| 
                          
                             | 4,594 | 607,344 | C$ 823,552 | C$ 179 | C$ 11,194 | C$ — | C$ — | C$ 182 | 
| 
                           | 652 | 114,824 | 
                          A | A$ 267 | A$ (2,041) | A$ — | A$ — | A$ 264 | 
| 
                          
                             | 652 | 114,824 | 
                          
                            A | A$ 267 | A$ (2,041) | A$ — | A$ — | A$ 264 | 
| Kittila | 1,550 | 176,535 | € 162,375 | € 105 | € (3,354) | € — | € — | € 103 | 
| 
                          
                             | 1,550 | 176,535 | € 162,375 | € 105 | € (3,354) | € — | € — | € 103 | 
| 
                           | 1,326 | 122,980 | $ 122,980 | $ 93 | $ 2,235 | $ — | $ — | $ 94 | 
| 
                          La  | — | 39,445 | $ 39,445 | $ — | $ (39,445) | $ — | $ — | $ — | 
| 
                          
                             | 1,326 | 162,425 | $ 162,425 | $ 122 | $ (37,210) | $ — | $ — | $ 94 | 
|  |  |  |  |  |  |  |  |  | 
| Notes: | |
| (i) | This inventory adjustment reflects production costs associated with the portion of production still in inventory. | 
| (ii) | 
                          Relates to costs associated with a  | 
| (iii) | 
                          La  | 
All-in sustaining costs per ounce
All-in sustaining costs per ounce (also referred to as "AISC per ounce") on a by-product basis is calculated as the aggregate of total cash costs on a by-product basis, sustaining capital expenditures (including capitalized exploration), general and administrative expenses (including stock options), lease payments related to sustaining assets and reclamation expenses, and then dividing by the number of ounces of gold produced. These additional costs reflect the additional expenditures that are required to be made to maintain current production levels. The AISC per ounce on a co-product basis is calculated in the same manner as the AISC per ounce on a by-product basis, except that the total cash costs on a co-product basis are used, meaning no adjustment is made for by-product metal revenues. Investors should note that AISC per ounce is not reflective of all cash expenditures as it does not include income tax payments, interest costs or dividend payments, nor does it include non-cash expenditures, such as depreciation and amortization. Unless otherwise indicated, all-in sustaining costs per ounce is reported on a by-product basis (see "Reconciliation of Production Costs to Total Cash Costs per Ounce by Mine" for a discussion of regarding the Company's use of by-product basis reporting).
Management believes that AISC per ounce is useful to investors as it reflects total sustaining expenditures of producing and selling an ounce of gold while maintaining current operations and, as such, provides useful information about operating performance. Management is aware, and investors should note, that these per ounce measures of performance can be affected by fluctuations in foreign exchange rates and, in the case of AISC per ounce on a by-product basis, by-product metal prices. Management compensates for these inherent limitations by using, and investors should also consider using, these measures in conjunction with data prepared in accordance with IFRS Accounting Standards and minesite costs per tonne, as this measure is not necessarily indicative of operating costs or cash flow measures prepared in accordance with IFRS Accounting Standards.
The Company follows the guidance on calculation of AISC per ounce released by the World Gold Council ("WGC") in 2018. The WGC is a non-regulatory market development organization for the gold industry that has worked closely with its member companies to develop guidance in respect of relevant non-GAAP measures. Notwithstanding the Company's adoption of the WGC's guidance, AISC per ounce reported by the Company may not be comparable to data reported by other gold mining companies.
The following table sets out a reconciliation of production costs to all-in sustaining costs per ounce for the three and nine months ended September 30, 2025 and September 30, 2024 on both a by-product basis (deducting by-product metal revenues from production costs) and a co-product basis (without deducting by-product metal revenues).
| (United States dollars per ounce, except where noted) | Three Months Ended September 30, |  | Nine Months Ended September 30, | ||||
|  | 2025 |  | 2024 |  | 2025 |  | 2024 | 
| Production costs per the condensed interim consolidated statements of income (thousands) | $ 839,321 |  | $ 783,653 |  | $ 2,396,241 |  | $ 2,339,222 | 
| Less: Production costs from non-operating minesites | (4,070) |  | — |  | (4,070) |  | — | 
| Adjusted production costs | 835,251 |  | 783,653 |  | 2,392,171 |  | 2,339,222 | 
| Gold production (ounces)(i) | 866,936 |  | 863,445 |  | 2,606,759 |  | 2,637,935 | 
| Production costs per ounce | $ 963 |  | $ 908 |  | $ 918 |  | $ 887 | 
| Adjustments: |  |  |  |  |  |  |  | 
| Inventory adjustments(ii) | 33 |  | — |  | 18 |  | — | 
| In-kind royalty(iii) | 51 |  | — |  | 47 |  | — | 
| Realized gains and losses on hedges of production costs | (4) |  | 5 |  | 1 |  | 4 | 
| Other(iv) | 8 |  | 40 |  | 8 |  | 40 | 
| Total cash costs per ounce (co-product basis) | $ 1,051 |  | $ 953 |  | $ 992 |  | $ 931 | 
| By-product metal revenues | (57) |  | (32) |  | (49) |  | (34) | 
| Total cash costs per ounce (by-product basis) | $ 994 |  | $ 921 |  | $ 943 |  | $ 897 | 
| Adjustments: |  |  |  |  |  |  |  | 
| Sustaining capital expenditures (including capitalized exploration) | 282 |  | 292 |  | 250 |  | 244 | 
| General and administrative expenses (including stock option expense) | 78 |  | 56 |  | 71 |  | 55 | 
| Non-cash reclamation provision and sustaining leases(v) | 19 |  | 17 |  | 17 |  | 18 | 
| All-in sustaining costs per ounce (by-product basis) | $ 1,373 |  | $ 1,286 |  | $ 1,281 |  | $ 1,214 | 
| By-product metal revenues | 57 |  | 32 |  | 49 |  | 34 | 
| All-in sustaining costs per ounce (co-product basis) | $ 1,430 |  | $ 1,318 |  | $ 1,330 |  | $ 1,248 | 
|  |  |  |  |  |  |  |  | 
| Notes: | |||||||
| (i) Gold production for the three months ended September 30, 2025 excludes 945 ounces of payable production of gold at La India and 189 ounces of payable production of gold at Creston Mascota, which were produced from residual leaching as well as 2,442 ounces of gold recovered at Hope Bay. Gold production for the nine months ended September 30, 2025 excludes 3,614 ounces of payable production of gold at La India and 253 ounces of payable production of gold at Creston Mascota, which were produced from residual leaching as well as 2,442 ounces of gold recovered at Hope Bay | |||||||
| 
                          (ii) Under the Company's revenue recognition policy, revenue from contracts with customers is recognized upon the transfer of control over metals sold to the customer. As the total cash costs per ounce are calculated on a production basis, an inventory adjustment is made to reflect the portion of production not yet recognized as revenue. Included in inventory adjustments for Canadian Malartic for the three and nine months ended September 30, 2025 is  | |||||||
| 
                          (iii) Relates to costs associated with a  | |||||||
| (iv) Other adjustments consists of smelting, refining and marketing charges to production costs | |||||||
| (v) Sustaining leases are lease payments related to sustaining assets | 
Adjusted net income and adjusted net income per share
Adjusted net income and adjusted net income per share are calculated by adjusting the net income as recorded in the condensed interim consolidated statements of income for the effects of certain items that the Company believes are not reflective of the Company's underlying performance for the reporting period. Adjusted net income is calculated by adjusting net income for items such as foreign currency translation gains or losses, realized and unrealized gains or losses on derivative financial instruments, severance and transaction costs related to acquisitions, revaluation gains and losses, environmental remediation, gains or losses on the disposal of assets, purchase price allocations to inventory, debt extinguishment costs, impairment loss charges and reversals, gains and losses on the sale of equity securities, retroactive payments, and income and mining taxes adjustments. Adjusted net income per share is calculated by dividing adjusted net income by the weighted average number of shares outstanding on a basic and diluted basis.
The Company believes that these generally accepted industry measures are useful to investors in that they allow for the evaluation of the results of continuing operations and in making comparisons between periods. Adjusted net income and adjusted net income per share are intended to provide investors with information about the Company's continuing income generating capabilities from its core mining business, excluding the above adjustments, which the Company believes are not reflective of operational performance. Management uses this measure to, and believes it is useful to investors so they can, understand and monitor for the operating performance of the Company in conjunction with other data prepared in accordance with IFRS Accounting Standards.
The following table sets out a reconciliation of net income per the condensed interim consolidated statements of income to adjusted net income for the three and nine months ended September 30, 2025, and September 30, 2024.
|  | 
                          
                            Three Months Ended |  | Nine Months Ended September 30, | ||||
| (thousands) | 2025 |  | 2024 |  | 2025 |  | 2024 | 
| Net income for the period | $ 1,054,958 |  | $ 567,118 |  | $ 2,938,400 |  | 
                          
                             | 
| Foreign currency translation (gain) loss | (6,559) |  | 3,436 |  | (18,190) |  | (748) | 
| Realized and unrealized loss (gain) on derivative financial instruments | 20,242 |  | (17,153) |  | (173,881) |  | 48,390 | 
| Environmental remediation | 2,370 |  | 6,294 |  | 24,334 |  | 11,201 | 
| Net loss on disposal of property, plant and equipment | 5,719 |  | 5,420 |  | 17,824 |  | 25,786 | 
| Purchase price allocation to inventory | 3,700 |  | — |  | 6,234 |  | — | 
| Debt extinguishment costs | 2,838 |  | — |  | 8,245 |  | — | 
| Impairment loss(i) | — |  | — |  | 10,554 |  | — | 
| Loss on sale of equity securities | 40,175 |  | — |  | 40,175 |  | — | 
| Other(ii) | — |  | — |  | 2,077 |  | 13,215 | 
| Income and mining taxes adjustments(iii) | (38,234) |  | 7,462 |  | (24,676) |  | 1,146 | 
| Adjusted net income for the period | $ 1,085,209 |  | $ 572,577 |  | $ 2,831,096 |  | 
                          
                             | 
|  |  |  |  |  |  |  |  | 
| Notes: | |||||||
| (i) Relates to the Company's ownership percentage of an impairment loss recorded by an associate | |||||||
| (ii) Other adjustments relate to retroactive payments that management considers not reflective of the Company's underlying performance in the comparative period | |||||||
| (iii) Income and mining taxes adjustments reflect items such as foreign currency translation recorded to the income and mining taxes expense, the impact of income and mining taxes on adjusted items, recognition of previously unrecognized capital losses, the result of income and mining taxes audits, impact of tax law changes and adjustments to prior period tax filings | 
EBITDA and adjusted EBITDA
EBITDA is calculated by adjusting net income for finance costs, amortization of property, plant and mine development and income and mining tax expense line items as reported in the condensed interim consolidated statements of income.
Adjusted EBITDA removes the effects of certain items that the Company believes are not reflective of the Company's underlying performance for the reporting period. Adjusted EBITDA is calculated by adjusting the EBITDA calculation for items such as foreign currency translation gains or losses, realized and unrealized gains or losses on derivative financial instruments, severance and transaction costs related to acquisitions, revaluation gains and losses, environmental remediation, gains or losses on the disposal of assets, purchase price allocations to inventory, debt extinguishment costs, impairment loss charges and reversals, gains and losses on the sale of equity securities, retroactive payments, and income and mining taxes adjustments.
The Company believes that these generally accepted industry measures are useful in that they allow for the evaluation of the cash generating capability of the Company to fund its working capital, capital expenditure and debt repayments. EBITDA and Adjusted EBITDA are intended to provide investors with information about the Company's continuing cash generating capability from its core mining business, excluding the above adjustments, which management believes are not reflective of operational performance. Management uses these measures to, and believes it is useful to investors so they can, understand and monitor the cash generating capability of the Company in conjunction with other data prepared in accordance with IFRS Accounting Standards.
The following table sets out a reconciliation of net income per the condensed interim consolidated statements of income to EBITDA and adjusted EBITDA for the three and nine months ended September 30, 2025, and September 30, 2024.
|  | Three Months Ended September 30, |  | Nine Months Ended September 30, | ||||
| (thousands) | 2025 |  | 2024 |  | 2025 |  | 2024 | 
|  |  |  |  |  |  |  |  | 
| Net income for the period | 
                           |  | $ 567,118 |  | $ 2,938,400 |  | $ 1,386,326 | 
| Finance costs | 24,154 |  | 28,527 |  | 74,027 |  | 99,265 | 
| Amortization of property, plant and mine development | 429,947 |  | 390,245 |  | 1,223,703 |  | 1,125,859 | 
| Income and mining tax expense | 520,610 |  | 272,672 |  | 1,448,358 |  | 652,718 | 
| EBITDA | 2,029,669 |  | 1,258,562 |  | 5,684,488 |  | 3,264,168 | 
| Foreign currency translation (gain) loss | (6,559) |  | 3,436 |  | (18,190) |  | (748) | 
| Realized and unrealized loss (gain) on derivative financial instruments | 20,242 |  | (17,153) |  | (173,881) |  | 48,390 | 
| Environmental remediation | 2,370 |  | 6,294 |  | 24,334 |  | 11,201 | 
| Net loss on disposal of property, plant and equipment | 5,719 |  | 5,420 |  | 17,824 |  | 25,786 | 
| Purchase price allocation to inventory | 3,700 |  | — |  | 6,234 |  | — | 
| Debt extinguishment costs | 2,838 |  | — |  | 8,245 |  | — | 
| Impairment loss(i) | — |  | — |  | 10,554 |  | — | 
| Loss on sale of equity securities | 40,175 |  | — |  | 40,175 |  | — | 
| Other(ii) | — |  | — |  | 2,077 |  | 13,215 | 
| Adjusted EBITDA | 
                           |  | 
                           |  | $ 5,601,860 |  | $ 3,362,012 | 
|  |  |  |  |  |  |  |  | 
| Notes: | |||||||
| (i) Relates to the Company's ownership percentage of an impairment loss recorded by an associate | |||||||
| (ii) Other adjustments relate to retroactive payments that management considers not reflective of the Company's underlying performance in the comparative period | 
Cash provided by operating activities before changes in non-cash components of working capital and its per share ratio
Cash provided by operating activities before changes in non-cash components of working capital is calculated by adjusting the cash provided by operating activities as shown in the condensed interim consolidated statements of cash flows for the effects of changes in non-cash components of working capital such as income taxes, inventories, other current assets, accounts payable and accrued liabilities and interest payable. The per share ratio is calculated by dividing cash provided by operating activities before changes in non-cash components of working capital by the weighted average number of shares outstanding on a basic basis. The Company believes that changes in working capital can be volatile due to numerous factors, including the timing of payments. Management uses these measures to, and believes they are useful to investors so they can, assess the underlying operating cash flow performance and future operating cash flow generating capabilities of the Company in conjunction with other data prepared in accordance with IFRS Accounting Standards. A reconciliation of these measures to the nearest IFRS Accounting Standards measure is provided below.
Free cash flow and free cash flow before changes in non-cash components of working capital
Free cash flow is calculated by deducting additions to property, plant and mine development from the cash provided by operating activities line item as recorded in the condensed interim consolidated statements of cash flows.
Free cash flow before changes in non-cash components of working capital is calculated by excluding items such as the effect of changes in non-cash components of working capital from free cash flow, which includes income taxes, inventory, other current assets, accounts payable and accrued liabilities and interest payable.
The Company believes that these generally accepted industry measures are useful in that they allow for the evaluation of the Company's ability to repay creditors and return cash to shareholders without relying on external sources of funding. Free cash flow and free cash flow before changes in non-cash components of working capital also provide investors with information about the Company's financial position and its ability to generate cash to fund operational and capital requirements as well as return cash to shareholders. Management uses these measures in conjunction with other data prepared in accordance with IFRS Accounting Standards to, and believes it is useful to investors so they can, understand and monitor the cash generating ability of the Company.
The following table sets out a reconciliation of cash provided by operating activities per the condensed interim consolidated statements of cash flows to free cash flow and free cash flow before changes in non-cash components of working capital and to cash provided by operating activities before changes in non-cash components of working capital for the three and nine months ended September 30, 2025, and September 30, 2024.
|  | 
                          
                            Three Months Ended |  | Nine Months Ended September 30, | ||||
| (thousands, except where noted) | 2025 |  | 2024 |  | 2025 |  | 2024 | 
|  |  |  |  |  |  |  |  | 
| Cash provided by operating activities | $ 1,815,875 |  | $ 1,084,532 |  | $ 4,705,609 |  | $ 2,829,043 | 
| Additions to property, plant and mine development | (626,330) |  | (464,101) |  | (1,616,930) |  | (1,255,786) | 
| Free cash flow | 1,189,545 |  | 620,431 |  | 3,088,679 |  | 1,573,257 | 
| Changes in income taxes | (189,741) |  | (95,930) |  | (491,108) |  | (142,732) | 
| Changes in inventory | 143,052 |  | 156,871 |  | 165,196 |  | 165,727 | 
| Changes in other current assets | 11,022 |  | (41,263) |  | 17,784 |  | 16,237 | 
| Changes in accounts payable and accrued liabilities | (122,303) |  | (80,704) |  | (198,893) |  | (74,622) | 
| Changes in interest payable | 3,339 |  | 3,964 |  | 4,132 |  | (2,867) | 
| Free cash flow before changes in non-cash components of working capital | $ 1,034,914 |  | $ 563,369 |  | $ 2,585,790 |  | $ 1,535,000 | 
| Additions to property, plant and mine development | 626,330 |  | 464,101 |  | 1,616,930 |  | 1,255,786 | 
| Cash provided by operating activities before changes in non-cash components of working capital | $ 1,661,244 |  | $ 1,027,470 |  | $ 4,202,720 |  | $ 2,790,786 | 
|  |  |  |  |  |  |  |  | 
| Cash provided by operating activities per share - basic | $ 3.62 |  | $ 2.16 |  | $ 9.37 |  | $ 5.67 | 
| Cash provided by operating activities before changes in non-cash components of working capital per share - basic | $ 3.31 |  | $ 2.05 |  | $ 8.37 |  | $ 5.59 | 
|  |  |  |  |  |  |  |  | 
| Free cash flow per share - basic | $ 2.37 |  | $ 1.24 |  | $ 6.15 |  | $ 3.15 | 
| Free cash flow before changes in non-cash components of working capital per share - basic | $ 2.06 |  | $ 1.12 |  | $ 5.15 |  | $ 3.07 | 
Operating margin
Operating margin is calculated by deducting production costs from revenue from mining operations. In order to reconcile operating margin to net income as recorded in the condensed interim consolidated financial statements, the Company adds the following items to the operating margin: income and mining taxes expense; other expenses (income); care and maintenance expenses; foreign currency translation (gain) loss; environmental remediation costs; loss (gain) on derivative financial instruments; finance costs; general and administrative expenses; amortization of property, plant and mine development; exploration and corporate development expenses; and revaluation gain and impairment losses (reversals). The Company believes that operating margin is a useful measure to investors as it reflects the operating performance of its individual mines associated with the ongoing production and sale of gold and by-product metals without allocating Company-wide overhead, including exploration and corporate development expenses, amortization of property, plant and mine development, general and administrative expenses, finance costs, gain and losses on derivative financial instruments, environmental remediation costs, foreign currency translation gains and losses, other expenses and income and mining tax expenses. Management uses this measure internally to plan and forecast future operating results. Management believes this measure is useful to investors as it provides them with additional information about the Company's underlying operating results and should be evaluated in conjunction with other data prepared in accordance with IFRS Accounting Standards. For a reconciliation of operating margin to revenue from operations, see "Summary of Operations Key Performance Indicators".
Capital expenditures
Capital expenditures are calculated by deducting working capital adjustments from additions to property, plant and mine development per the condensed interim consolidated statements of cash flows.
Capital expenditures are classified into sustaining capital expenditures, sustaining capitalized exploration, development capital expenditures and development capitalized exploration. Sustaining capital expenditures and sustaining capitalized exploration are expenditures incurred during the production phase to sustain and maintain existing assets so they can achieve constant expected levels of production from which the Company will derive economic benefits. Sustaining capital expenditures and sustaining capitalized exploration include expenditure for assets to retain their existing productive capacity as well as to enhance performance and reliability of the operations. Development capital expenditures and development capitalized exploration represent the spending at new projects and/or expenditures at existing operations that are undertaken with the intention to increase production levels or mine life above the current plans. Management uses these measures in the capital allocation process and to assess the effectiveness of its investments. Management believes these measures are useful so investors can assess the purpose and effectiveness of the capital expenditures split between sustaining and development in each reporting period. The classification between sustaining and development capital expenditures does not have a standardized definition in accordance with IFRS Accounting Standards and other companies may classify expenditures in a different manner.
The following table sets out a reconciliation of sustaining capital expenditures, sustaining capitalized exploration, development capital expenditures and development capitalized exploration to the additions to property, plant and mine development per the condensed interim consolidated statements of cash flows for the three and nine months ended September 30, 2025 and September 30, 2024.
| (thousands) | 
                          
                            Three Months Ended  |  | Nine Months Ended September 30, | ||||
|  | 2025 |  | 2024 |  | 2025 |  | 2024 | 
| Sustaining capital expenditures | $ 240,619 |  | $ 247,762 |  | $ 642,295 |  | $ 633,785 | 
| Sustaining capitalized exploration | 6,373 |  | 5,200 |  | 16,335 |  | 15,124 | 
| Development capital expenditures | 316,054 |  | 189,406 |  | 728,924 |  | 502,924 | 
| Development capitalized exploration | 80,809 |  | 43,427 |  | 213,488 |  | 113,282 | 
| Total Capital Expenditures | $ 643,855 |  | $ 485,795 |  | $ 1,601,042 |  | $ 1,265,115 | 
| Working capital adjustments | (17,525) |  | (21,694) |  | 15,888 |  | (9,329) | 
| Additions to property, plant and mine development per the condensed interim consolidated statements of cash flows | $ 626,330 |  | $ 464,101 |  | $ 1,616,930 |  | $ 1,255,786 | 
|  |  |  |  |  |  |  |  | 
Net cash (debt)
Net cash (debt) is calculated by adjusting the total of the current portion of long-term debt and non-current long-term debt as recorded on the condensed interim consolidated balance sheets for deferred financing costs and cash and cash equivalents. Management believes the measure of net cash (debt) is useful to help investors determine the Company's overall cash (debt) position and to evaluate the future debt capacity of the Company. The Company changed the label for this non-GAAP measure from "net debt" to "net cash (debt)" as the Company believes that reporting a positive net cash position is more clear and understandable to readers than a negative net debt position. The Company's method of calculating this non-GAAP measure has not changed.
The following table sets out a reconciliation of long-term debt per the condensed interim consolidated balance sheets to net cash (debt) as at September 30, 2025, and December 31, 2024.
|  | As at |  | As at | 
| (thousands) | September 30, 2025 |  | December 31, 2024 | 
| Current portion of long-term debt per the condensed interim consolidated balance sheets | $ — |  | $ (90,000) | 
| Non-current portion of long-term debt | (195,994) |  | (1,052,956) | 
| Long-term debt | $ (195,994) |  | $ (1,142,956) | 
| Cash and cash equivalents | $ 2,354,759 |  | $ 926,431 | 
| Net cash (debt) | $ 2,158,765 |  | $ (216,525) | 
Forward-Looking Non-GAAP Measures
This news release also contains information as to estimated future total cash costs per ounce and AISC per ounce. The estimates are based upon the total cash costs per ounce and AISC per ounce that the Company expects to incur to mine gold at its mines and projects and, consistent with the reconciliation of these actual costs referred to above, do not include production costs attributable to accretion expense and other asset retirement costs, which will vary over time as each project is developed and mined. It is therefore not practicable to reconcile these forward-looking non-GAAP financial measures to the most comparable IFRS Accounting Standards measure.
Forward-Looking Statements
The information in this news release has been prepared as at October 29, 2025. Certain statements contained in this news release constitute "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" under the provisions of Canadian provincial securities laws and are referred to herein as "forward-looking statements". All statements, other than statements of historical fact, that address circumstances, events, activities or developments that could, or may or will occur are forward-looking statements. When used in this news release, the words "achieve", "aim", "anticipate", "commit", "could", "estimate", "expect", "forecast", "future", "guide", "objective", "plan", "potential", "schedule", "target", "track", "will", and similar expressions are intended to identify forward-looking statements. Such statements include the Company's forward-looking guidance, including metal production, estimated ore grades, recovery rates, project timelines, drilling targets or results, life of mine estimates, total cash costs per ounce, AISC per ounce, other expenses and cash flows; the potential for additional gold production at the Company's sites; the estimated timing and conclusions of the Company's studies and evaluations; the methods by which ore will be extracted or processed; the Company's expansion plans at Detour Lake, Upper Beaver and Odyssey, including the timing, funding, completion and commissioning thereof and the commencement of production therefrom; the Company's plans at Hope Bay and 
Additional Information
Additional information about each of the Company's material mineral projects as at December 31, 2024, including information regarding data verification, key assumptions, parameters and methods used to estimate mineral reserves and mineral resources and the risks that could materially affect the development of the mineral reserves and mineral resources required by sections 3.2 and 3.3 and paragraphs 3.4(a), (c) and (d) of National Instrument 43-101 – Standards of Disclosure for Mineral Projects can be found in the Company's AIF and 2024 MD&A filed on SEDAR+ each of which forms a part of the Company's Form 40-F filed with the SEC on EDGAR and in the following technical reports filed on SEDAR+ in respect of the Company's material mineral properties: Detour Lake Operation, 
APPENDIX A – EXPLORATION DETAILS
Eclipse zone and East Gouldie and Odyssey deposits at Odyssey mine
| Drill hole | Deposit / zone | From (metres) | To (metres) | Depth of midpoint below 
                          surface  | Estimated true width (metres) | Gold grade (g/t) (uncapped) | Gold grade (g/t) (capped)* | 
| MEX23-309WZ | Eclipse | 1,520.5 | 1,531.3 | 1,057 | 10.1 | 3.9 | 3.9 | 
| MEX24-322WBZA | East Gouldie | 2,152.3 | 2,189.0 | 1,991 | 29.9 | 2.3 | 2.3 | 
| including |  | 2,175.2 | 2,189.0 | 2,001 | 11.3 | 4.0 | 4.0 | 
| MEX25-337 | East Gouldie | 1,597.9 | 1,652.4 | 1,531 | 51.8 | 2.0 | 2.0 | 
| MEX25-337W | East Gouldie | 1,581.0 | 1,603.0 | 1,352 | 21.6 | 3.3 | 3.3 | 
| including |  | 1,590.0 | 1,598.0 | 1,353 | 7.7 | 6.2 | 6.2 | 
| UGEG-075-054 | East Gouldie | 558.0 | 573.5 | 907 | 15.4 | 5.5 | 5.5 | 
| including |  | 558.0 | 566.1 | 905 | 8.0 | 8.2 | 8.2 | 
| UGEG-075-056 | East Gouldie | 547.5 | 573.1 | 884 | 25.4 | 5.1 | 4.8 | 
| including |  | 549.3 | 556.4 | 881 | 7.0 | 13.2 | 12.0 | 
| UGEG-083-016 | East Gouldie | 146.6 | 170.0 | 891 | 16.8 | 2.5 | 2.5 | 
| UGOD-075-043 | Odyssey North | 587.0 | 602.4 | 943 | 13.3 | 3.3 | 3.3 | 
| UGOD-075-032 | Odyssey internal | 439.9 | 456.0 | 810 | 14.3 | 3.6 | 3.6 | 
| and | Odyssey internal | 468.0 | 474.0 | 822 | 5.3 | 22.5 | 10.7 | 
| UGOD-058-005 | Odyssey Jupiter | 491.4 | 505.5 | 800 | 12.6 | 2.9 | 2.9 | 
| MEV25-304 | Odyssey South | 326.0 | 341.5 | 250 | 14.0 | 6.7 | 3.6 | 
| including |  | 326.0 | 327.5 | 244 | 1.4 | 52.6 | 20.0 | 
| *Results from Eclipse, East Gouldie and Odyssey use a capping factor of 20 g/t gold. | 
Marban deposit
| Drill hole | From (metres) | To (metres) | 
                          Depth of  | Estimated 
                          true width  | Gold grade 
                          (g/t)  | Gold grade (g/t) (capped)* | 
| MRB25-005 | 84.3 | 90.4 | 64 | 6.1 | 1.3 | 1.3 | 
| and | 333.0 | 345.6 | 248 | 11.5 | 1.3 | 1.3 | 
| and | 351.0 | 357.1 | 258 | 5.6 | 1.8 | 1.8 | 
| MRB25-006 | 242.4 | 245.4 | 191 | 3.0** | 3.3 | 3.3 | 
| MRB25-015 | 117.2 | 122.4 | 103 | 4.9 | 3.2 | 3.2 | 
| MRB25-029 | 121.0 | 126.5 | 103 | 5.5** | 2.2 | 2.2 | 
| MRB25-030 | 401.5 | 407.0 | 309 | 5.5 | 4.3 | 4.3 | 
| and | 494.0 | 505.0 | 384 | 10.9 | 4.6 | 4.6 | 
| MRB25-033 | 159.2 | 162.0 | 117 | 2.8** | 5.3 | 5.3 | 
| and | 201.5 | 203.0 | 147 | 1.5** | 15.3 | 15.3 | 
| MRB25-034 | 127.5 | 133.5 | 116 | 5.2 | 1.8 | 1.8 | 
| MRB25-038 | 102.0 | 113.4 | 80 | 11.4** | 3.3 | 3.3 | 
| including | 103.2 | 104.0 | 78 | 0.8 | 13.4 | 13.4 | 
| including | 106.7 | 109.1 | 82 | 2.4** | 10.5 | 10.5 | 
| and | 216.2 | 219.6 | 165 | 3.4** | 4.1 | 4.1 | 
| MRB25-051 | 265.0 | 266.5 | 191 | 1.5** | 20.1 | 20.1 | 
| *Results from Marban use a capping factor ranging from 10 g/t to 40 g/t gold depending on the zone. | 
| **Core length. True width undetermined. | 
West Pit and West Extension zones at Detour Lake
| Drill hole | Zone | 
                          From  | To (metres) | 
                          Depth of  | Estimated 
                          true  | 
                          Gold grade  | 
| DLM25-1144A | West Pit | 652.2 | 767.5 | 565 | 106.2 | 1.5 | 
| including |  | 652.2 | 668.0 | 528 | 14.5 | 2.9 | 
| including |  | 751.1 | 762.2 | 600 | 10.3 | 6.1 | 
| DLM25-1156 | West Pit | 385.0 | 436.0 | 323 | 46.5 | 1.0 | 
| and |  | 506.0 | 533.0 | 405 | 24.8 | 1.7 | 
| and |  | 642.0 | 691.9 | 514 | 46.4 | 1.2 | 
| and |  | 745.0 | 768.0 | 578 | 21.5 | 1.5 | 
| DLM25-1161 | West Extension | 1,009.8 | 1,013.0 | 860 | 2.9 | 137.1 | 
| DLM25-1162 | West Extension | 640.0 | 758.0 | 575 | 108.6 | 0.8 | 
| DLM25-1163 | West Pit | 636.4 | 639.9 | 486 | 3.3 | 17.2 | 
| and |  | 663.0 | 700.0 | 518 | 34.5 | 2.1 | 
| including |  | 684.0 | 695.0 | 523 | 10.3 | 4.0 | 
| and |  | 789.0 | 792.0 | 595 | 2.8 | 10.2 | 
| and |  | 996.0 | 1,012.0 | 746 | 15.0 | 8.0 | 
| including |  | 1,007.0 | 1,012.0 | 750 | 4.7 | 27.0 | 
| and |  | 1,049.0 | 1,063.0 | 783 | 13.2 | 5.4 | 
| and |  | 1,086.0 | 1,091.0 | 806 | 4.7 | 5.3 | 
| DLM25-1164 | West Pit | 338.1 | 400.0 | 297 | 55.7 | 2.7 | 
| including |  | 385.0 | 395.0 | 313 | 9.0 | 11.8 | 
| and |  | 473.0 | 486.5 | 381 | 12.4 | 4.6 | 
| DLM25-1168 | West Pit | 413.2 | 488.0 | 343 | 69.7 | 1.8 | 
| including |  | 467.0 | 475.0 | 357 | 7.5 | 10.2 | 
| and |  | 625.1 | 667.0 | 480 | 39.8 | 3.0 | 
| including |  | 655.7 | 667.0 | 490 | 10.7 | 7.6 | 
| and |  | 682.3 | 696.0 | 509 | 13.1 | 3.4 | 
| DLM25-1175 | West Pit | 423.0 | 435.9 | 344 | 11.7 | 2.8 | 
| and |  | 578.0 | 606.0 | 466 | 25.9 | 2.2 | 
| including |  | 582.2 | 595.0 | 463 | 11.9 | 3.6 | 
| DLM25-1179B | West Extension | 587.7 | 620.2 | 538 | 26.8 | 7.4 | 
| including |  | 587.7 | 591.5 | 526 | 3.1 | 10.3 | 
| including |  | 604.9 | 612.5 | 542 | 6.3 | 23.6 | 
| DLM25-1188 | West Extension | 546.0 | 549.0 | 471 | 2.6 | 19.1 | 
| and |  | 1,040.0 | 1,051.0 | 845 | 10.3 | 2.7 | 
| and |  | 1,112.0 | 1,122.9 | 896 | 10.3 | 2.2 | 
| *Results from Detour Lake are uncapped. | 
                  
| Drill hole | Zone | 
                          From  | 
                          To  | 
                          Depth of  | 
                          Estimated  | Gold grade 
                          (g/t)  | Gold grade (g/t) (capped)* | 
| HBM25-349 | undefined | 622.5 | 625.5 | 544 | 2.6 | 17.9 | 17.9 | 
| HBM25-352 | Patch 7 | 821.0 | 824.0 | 629 | 2.5 | 14.7 | 14.7 | 
| HBM25-354 | Patch 7 | 446.0 | 451.0 | 348 | 3.8 | 10.7 | 10.7 | 
| HBM25-359 | Patch 7 | 329.0 | 337.0 | 274 | 6.1 | 4.3 | 4.3 | 
| HBM25-364 | Patch 7 | 916.0 | 927.3 | 834 | 9.3 | 13.8 | 12.7 | 
| including | Patch 7 | 925.0 | 926.0 | 837 | 0.8 | 43.8 | 43.8 | 
| including | Patch 7 | 926.8 | 927.3 | 838 | 0.4 | 124.0 | 85.0 | 
| and | Patch 7 | 930.0 | 940.0 | 844 | 8.2 | 4.1 | 4.1 | 
| HBM25-365 | Patch 7 | 622.0 | 634.0 | 486 | 9.8 | 6.0 | 6.0 | 
| including | Patch 7 | 631.0 | 632.0 | 488 | 0.9 | 19.6 | 19.6 | 
| HBM25-367 | Patch 7 | 470.5 | 481.5 | 374 | 10.8 | 6.7 | 6.7 | 
| and | undefined | 492.0 | 495.8 | 386 | 3.7 | 8.9 | 8.9 | 
| and | Patch 7 | 539.7 | 544.7 | 419 | 4.8 | 5.4 | 5.4 | 
| HBM25-368A | Patch 7 | 1,123.0 | 1,127.0 | 700 | 3.9 | 12.5 | 12.5 | 
| HBM25-369 | undefined | 141.5 | 144.5 | 115 | 2.3 | 11.2 | 11.2 | 
| and | Patch 7 | 469.0 | 472.0 | 398 | 3.0 | 12.8 | 12.8 | 
| and | Patch 7 | 560.7 | 563.7 | 471 | 2.5 | 12.3 | 12.3 | 
| HBM25-376 | Patch 7 | 362.1 | 368.0 | 290 | 5.7 | 6.6 | 6.6 | 
| HBM25-381 | Patch 7 | 1,110.5 | 1,115.4 | 866 | 4.6 | 81.4 | 16.9 | 
| including | Patch 7 | 1,110.5 | 1,111.4 | 865 | 0.9 | 401.0 | 50.0 | 
| HBM25-383 | undefined | 757.0 | 766.5 | 596 | 8.9 | 5.0 | 5.0 | 
| 
                          *Results from  | 
IVR and Whale Tail zones at Amaruq
| Drill hole | Zone | 
                          From  | 
                          To  | 
                          Depth of  | 
                          Estimated  | Gold grade 
                          (g/t)  | Gold grade (g/t) (capped)* | 
| AMQ24-3091 | IVR | 903.1 | 911.5 | 773 | 6.4 | 13.8 | 8.2 | 
| AMQ24-3091B | IVR | 960.3 | 979.0 | 873 | 16.2 | 12.0 | 6.0 | 
| including |  | 973.3 | 979.0 | 879 | 4.9 | 27.9 | 10.2 | 
| AMQ24-3105A | IVR | 900.0 | 908.5 | 826 | 7.5 | 9.2 | 9.2 | 
| AMQ24-3190 | IVR | 140.5 | 146.5 | 172 | 4.3 | 21.0 | 21.0 | 
| including |  | 144.1 | 144.9 | 173 | 0.6 | 89.4 | 89.4 | 
| AMQ24-3191 | IVR | 143.5 | 152.3 | 177 | 5.6 | 20.7 | 14.8 | 
| including |  | 149.0 | 150.0 | 178 | 0.6 | 151.5 | 100.0 | 
| AMQ22-2852** | Whale Tail | 976.8 | 991.8 | 848 | 10.5 | 9.1 | 9.1 | 
| AMQ22-2876A** | Whale Tail | 1,051.0 | 1,069.2 | 1,000 | 18.2 | 7.4 | 7.4 | 
| AMQ24-3157 | Whale Tail | 946.7 | 952.0 | 890 | 4.6 | 11.8 | 11.8 | 
| AMQ25-3215B | Whale Tail | 853.5 | 864.7 | 774 | 7.9 | 8.4 | 8.4 | 
| AMQ25-3217A | Whale Tail | 916.6 | 926.4 | 865 | 4.1 | 7.1 | 7.1 | 
| AMQ25-3220 | Whale Tail | 819.0 | 829.8 | 750 | 7.7 | 4.7 | 4.7 | 
| AMQ25-3220B | Whale Tail | 834.3 | 853.2 | 779 | 10.8 | 4.6 | 4.3 | 
| AMQ25-3221B | Whale Tail | 638.1 | 643.9 | 547 | 4.1 | 45.7 | 12.8 | 
| and | Whale Tail | 721.1 | 729.9 | 620 | 6.2 | 4.5 | 4.5 | 
| *Results from Amaruq mine use a capping factor ranging from 20 g/t to 100 g/t gold depending on the zone. | 
| **Previously released in AEM news releases dated October 26, 2022 and February 16, 2023. | 
Exploration Drill Collar Coordinates
| Drill hole | UTM East* | UTM North* | 
                          Elevation  | 
                          Azimuth  | Dip (degrees) | 
                          Length  | 
| Odyssey mine | ||||||
| MEV25-304 | 719125 | 5333939 | 334 | 14 | -56 | 633 | 
| MEX23-309WZ | 718682 | 5334767 | 307 | 162 | -48 | 1,725 | 
| MEX24-322WBZA | 718617 | 5334759 | 307 | 215 | -70 | 2,382 | 
| MEX25-337 | 716867 | 5334695 | 317 | 190 | -78 | 1,812 | 
| MEX25-337W | 716867 | 5334695 | 317 | 190 | -78 | 1,800 | 
| UGEG-075-054 | 717714 | 5334081 | -342 | 166 | -31 | 733 | 
| UGEG-075-056 | 717716 | 5334080 | -339 | 174 | -28 | 703 | 
| UGEG-083-016 | 717376 | 5333673 | -498 | 234 | -33 | 285 | 
| UGOD-058-005 | 717913 | 5334573 | -264 | 114 | -28 | 710 | 
| UGOD-075-032 | 718144 | 5334120 | -254 | 351 | -37 | 598 | 
| UGOD-075-043 | 718006 | 5334110 | -261 | 5 | -42 | 648 | 
| Marban | ||||||
| MRB25-005 | 278406 | 5336377 | 306 | 195 | -46 | 483 | 
| MRB25-006 | 279318 | 5335303 | 300 | 196 | -51 | 343 | 
| MRB25-015 | 279214 | 5335924 | 303 | 199 | -60 | 157 | 
| MRB25-029 | 278945 | 5335900 | 303 | 176 | -56 | 550 | 
| MRB25-030 | 279040 | 5335878 | 303 | 178 | -50 | 631 | 
| MRB25-033 | 278982 | 5335542 | 300 | 180 | -45 | 450 | 
| MRB25-034 | 278997 | 5335899 | 303 | 182 | -62 | 307 | 
| MRB25-038 | 279101 | 5335557 | 298 | 180 | -48 | 400 | 
| MRB25-038 | 279101 | 5335557 | 298 | 180 | -48 | 400 | 
| MRB25-051 | 279034 | 5335735 | 301 | 184 | -45 | 474 | 
| Detour Lake | ||||||
| DLM25-1144A | 589207 | 5541635 | 284 | 180 | -58 | 790 | 
| DLM25-1156 | 589736 | 5541449 | 282 | 179 | -54 | 1,143 | 
| DLM25-1161 | 586878 | 5542169 | 300 | 182 | -66 | 1,260 | 
| DLM25-1162 | 587320 | 5541904 | 295 | 175 | -62 | 1,017 | 
| DLM25-1163 | 589674 | 5541450 | 284 | 178 | -54 | 1,122 | 
| DLM25-1164 | 588125 | 5541728 | 287 | 178 | -56 | 858 | 
| DLM25-1168 | 589267 | 5541636 | 284 | 180 | -53 | 777 | 
| DLM25-1175 | 588122 | 5541831 | 287 | 179 | -57 | 840 | 
| DLM25-1179B | 586281 | 5541960 | 289 | 183 | -67 | 750 | 
| DLM25-1188 | 586758 | 5542136 | 300 | 181 | -65 | 1,152 | 
| Hope Bay |  |  |  |  |  |  | 
| HBM25-349 | 434886 | 7548555 | 47 | 68 | -74 | 738 | 
| HBM25-352 | 434626 | 7548127 | 33 | 79 | -64 | 1,075 | 
| HBM25-354 | 435073 | 7547566 | 41 | 76 | -61 | 801 | 
| HBM25-359 | 434891 | 7548722 | 39 | 70 | -65 | 546 | 
| HBM25-364 | 434735 | 7548292 | 34 | 88 | -72 | 1,112 | 
| HBM25-365 | 434979 | 7547863 | 38 | 64 | -59 | 822 | 
| HBM25-367 | 435105 | 7548039 | 38 | 97 | -62 | 661 | 
| HBM25-368A | 434279 | 7548408 | 38 | 77 | -53 | 1,200 | 
| HBM25-369 | 435071 | 7547856 | 39 | 76 | -64 | 727 | 
| HBM25-376 | 435079 | 7547798 | 38 | 78 | -61 | 747 | 
| HBM25-381 | 434334 | 7548811 | 51 | 73 | -65 | 1,126 | 
| HBM25-383 | 434949 | 7547679 | 37 | 70 | -62 | 933 | 
| Meadowbank | ||||||
| AMQ22-2852 | 606165 | 7255744 | 181 | 143 | -73 | 1,095 | 
| AMQ22-2876A | 606120 | 7255600 | 161 | 129 | -75 | 1,143 | 
| AMQ24-3091 | 607955 | 7255946 | 165 | 297 | -70 | 1,059 | 
| AMQ24-3091B | 607955 | 7255946 | 165 | 297 | -70 | 1,081 | 
| AMQ24-3105A | 607828 | 7255878 | 167 | 295 | -73 | 999 | 
| AMQ24-3157 | 606250 | 7255606 | 172 | 136 | -78 | 1,003 | 
| AMQ24-3190 | 607118 | 7256280 | 111 | 328 | -63 | 195 | 
| AMQ24-3191 | 607118 | 7256280 | 111 | 353 | -63 | 231 | 
| AMQ25-3215B | 606109 | 7255569 | 161 | 113 | -65 | 892 | 
| AMQ25-3217A | 606103 | 7255555 | 160 | 134 | -69 | 961 | 
| AMQ25-3220 | 606316 | 7255690 | 163 | 141 | -69 | 864 | 
| AMQ25-3220B | 606316 | 7255690 | 163 | 141 | -69 | 930 | 
| AMQ25-3221B | 606380 | 7255686 | 164 | 147 | -60 | 777 | 
| *Coordinate Systems: NAD 83 UTM Zone 17N for Odyssey and Marban; NAD 1983 UTM Zone 17N for Detour Lake; NAD 1983 UTM Zone 13N for Hope Bay; and NAD 1983 UTM Zone 14N for Meadowbank. | 
APPENDIX B – FINANCIAL INFORMATION
| AGNICO EAGLE MINES LIMITED | |||||||
| SUMMARY OF OPERATIONS KEY PERFORMANCE INDICATORS | |||||||
| (thousands of United States dollars, except where noted) | |||||||
|  | |||||||
|  |  |  |  |  |  |  |  | 
|  | Three Months Ended September 30, |  | Nine Months Ended September 30, | ||||
|  | 2025 |  | 2024 |  | 2025 |  | 2024 | 
|  |  |  |  |  |  |  |  | 
| Net income - key line items: |  |  |  |  |  |  |  | 
| Revenue from mine operations: |  |  |  |  |  |  |  | 
| LaRonde mine | 221,527 |  | 159,294 |  | 678,936 |  | 435,799 | 
| LZ5 | 69,484 |  | 47,363 |  | 202,235 |  | 127,392 | 
| LaRonde | 291,011 |  | 206,657 |  | 881,171 |  | 563,191 | 
| 
                          Canadian  | 543,870 |  | 345,969 |  | 1,463,134 |  | 1,092,558 | 
| Goldex | 108,124 |  | 81,384 |  | 319,373 |  | 237,304 | 
| 
                          
                             | 943,005 |  | 634,010 |  | 2,663,678 |  | 1,893,053 | 
| Detour Lake | 653,283 |  | 437,920 |  | 1,642,343 |  | 1,140,293 | 
| Macassa | 282,208 |  | 162,334 |  | 778,101 |  | 455,203 | 
| 
                          
                             | 935,491 |  | 600,254 |  | 2,420,444 |  | 1,595,496 | 
| Meliadine | 267,332 |  | 208,209 |  | 880,138 |  | 630,724 | 
| Meadowbank | 476,831 |  | 315,047 |  | 1,216,631 |  | 873,047 | 
| 
                          
                             | 744,163 |  | 523,256 |  | 2,096,769 |  | 1,503,771 | 
| 
                           | 142,448 |  | 167,368 |  | 406,122 |  | 433,429 | 
| 
                          
                             | 142,448 |  | 167,368 |  | 406,122 |  | 433,429 | 
| Kittila | 190,208 |  | 148,652 |  | 519,238 |  | 395,875 | 
| 
                          
                             | 190,208 |  | 148,652 |  | 519,238 |  | 395,875 | 
| 
                           | 88,586 |  | 68,336 |  | 221,999 |  | 184,526 | 
| 
                          La  | — |  | 13,733 |  | — |  | 55,903 | 
| 
                          
                             | 88,586 |  | 82,069 |  | 221,999 |  | 240,429 | 
| Corporate and Other | 15,628 |  | — |  | 15,628 |  | — | 
| Revenues from mining operations | $ 3,059,529 |  | $ 2,155,609 |  | $ 8,343,878 |  | $ 6,062,053 | 
| Production costs | 839,321 |  | 783,653 |  | 2,396,241 |  | 2,339,222 | 
| Total operating margin(i) | 2,220,208 |  | 1,371,956 |  | 5,947,637 |  | 3,722,831 | 
| Amortization of property, plant and mine development | 429,947 |  | 390,245 |  | 1,223,703 |  | 1,125,859 | 
| Exploration, corporate and other | 214,693 |  | 141,921 |  | 337,176 |  | 557,928 | 
| Income before income and mining taxes | 1,575,568 |  | 839,790 |  | 4,386,758 |  | 2,039,044 | 
| Income and mining taxes expense | 520,610 |  | 272,672 |  | 1,448,358 |  | 652,718 | 
| Net income for the period | $ 1,054,958 |  | $ 567,118 |  | $ 2,938,400 |  | $ 1,386,326 | 
| Net income per share — basic | $ 2.10 |  | $ 1.13 |  | $ 5.85 |  | $ 2.78 | 
| Net income per share — diluted | $ 2.10 |  | $ 1.13 |  | $ 5.83 |  | $ 2.77 | 
|  |  |  |  |  |  |  |  | 
| Cash flows: |  |  |  |  |  |  |  | 
| Cash provided by operating activities | $ 1,815,875 |  | $ 1,084,532 |  | $ 4,705,609 |  | $ 2,829,043 | 
| Cash used in investing activities | $ (288,064) |  | $ (537,933) |  | $ (1,548,940) |  | $ (1,375,557) | 
| Cash used in provided by financing activities | $ (732,120) |  | $ (493,545) |  | $ (1,734,241) |  | $ (813,813) | 
|  |  |  |  |  |  |  |  | 
| Realized prices: |  |  |  |  |  |  |  | 
| Gold (per ounce) | $ 3,476 |  | $ 2,492 |  | $ 3,221 |  | $ 2,297 | 
| Silver (per ounce) | $ 43.43 |  | $ 30.69 |  | $ 37.80 |  | $ 28.31 | 
| Zinc (per tonne) | $ 2,694 |  | $ 2,822 |  | $ 2,728 |  | $ 2,697 | 
| Copper (per tonne) | $ 10,190 |  | $ 8,254 |  | $ 9,696 |  | $ 9,304 | 
| AGNICO EAGLE MINES LIMITED | |||||||
| SUMMARY OF OPERATIONS KEY PERFORMANCE INDICATORS | |||||||
| (thousands of United States dollars, except where noted) | |||||||
|  | |||||||
|  |  |  |  |  |  |  |  | 
|  | Three Months Ended September 30, |  | Nine Months Ended September 30, | ||||
|  | 2025 |  | 2024 |  | 2025 |  | 2024 | 
|  |  |  |  |  |  |  |  | 
| Payable production(ii): |  |  |  |  |  |  |  | 
| Gold (ounces): |  |  |  |  |  |  |  | 
| LaRonde mine | 59,172 |  | 47,313 |  | 201,319 |  | 161,388 | 
| LZ5 | 22,350 |  | 18,292 |  | 62,946 |  | 54,915 | 
| LaRonde | 81,522 |  | 65,605 |  | 264,265 |  | 216,303 | 
| 
                          Canadian  | 156,875 |  | 141,392 |  | 489,179 |  | 509,169 | 
| Goldex | 29,375 |  | 30,334 |  | 92,509 |  | 98,472 | 
| 
                          
                             | 267,772 |  | 237,331 |  | 845,953 |  | 823,944 | 
| Detour Lake | 176,539 |  | 173,891 |  | 497,649 |  | 492,889 | 
| Macassa | 78,832 |  | 70,727 |  | 252,224 |  | 203,048 | 
| 
                          
                             | 255,371 |  | 244,618 |  | 749,873 |  | 695,937 | 
| Meliadine | 93,836 |  | 99,838 |  | 282,611 |  | 284,238 | 
| Meadowbank | 136,152 |  | 133,502 |  | 378,213 |  | 387,695 | 
| 
                          
                             | 229,988 |  | 233,340 |  | 660,824 |  | 671,933 | 
| 
                           | 34,966 |  | 65,532 |  | 128,155 |  | 188,064 | 
| 
                          
                             | 34,966 |  | 65,532 |  | 128,155 |  | 188,064 | 
| Kittila | 57,954 |  | 56,715 |  | 162,415 |  | 166,967 | 
| 
                          
                             | 57,954 |  | 56,715 |  | 162,415 |  | 166,967 | 
| 
                           | 20,885 |  | 21,371 |  | 59,539 |  | 69,850 | 
| Creston Mascota | — |  | 9 |  | — |  | 50 | 
| 
                          La  | — |  | 4,529 |  | — |  | 21,190 | 
| 
                          
                             | 20,885 |  | 25,909 |  | 59,539 |  | 91,090 | 
| Total gold (ounces): | 866,936 |  | 863,445 |  | 2,606,759 |  | 2,637,935 | 
|  |  |  |  |  |  |  |  | 
| Silver (thousands of ounces) | 630 |  | 602 |  | 1,843 |  | 1,845 | 
| Zinc (tonnes) | 1,924 |  | 914 |  | 6,051 |  | 4,479 | 
| Copper (tonnes) | 1,468 |  | 797 |  | 4,013 |  | 2,673 | 
|  |  |  |  |  |  |  |  | 
| AGNICO EAGLE MINES LIMITED | |||||||
| SUMMARY OF OPERATIONS KEY PERFORMANCE INDICATORS | |||||||
| (thousands of United States dollars, except where noted) | |||||||
|  | |||||||
|  |  |  |  |  |  |  |  | 
|  | Three Months Ended September 30, |  | Nine Months Ended September 30, | ||||
|  | 2025 |  | 2024 |  | 2025 |  | 2024 | 
|  |  |  |  |  |  |  |  | 
| Payable metal sold(iii): |  |  |  |  |  |  |  | 
| Gold (ounces): |  |  |  |  |  |  |  | 
| LaRonde mine | 57,650 |  | 58,357 |  | 194,191 |  | 175,086 | 
| LZ5 | 19,574 |  | 18,920 |  | 62,450 |  | 55,436 | 
| LaRonde | 77,224 |  | 77,277 |  | 256,641 |  | 230,522 | 
| 
                          Canadian  | 157,228 |  | 139,694 |  | 452,721 |  | 475,893 | 
| Goldex | 28,479 |  | 31,671 |  | 92,339 |  | 99,896 | 
| 
                          
                             | 262,931 |  | 248,642 |  | 801,701 |  | 806,311 | 
| Detour Lake | 188,008 |  | 176,585 |  | 509,522 |  | 497,215 | 
| Macassa | 81,330 |  | 65,000 |  | 241,475 |  | 197,840 | 
| 
                          
                             | 269,338 |  | 241,585 |  | 750,997 |  | 695,055 | 
| Meliadine | 76,739 |  | 83,900 |  | 274,197 |  | 276,878 | 
| Meadowbank | 136,974 |  | 126,010 |  | 379,548 |  | 378,123 | 
| 
                          
                             | 213,713 |  | 209,910 |  | 653,745 |  | 655,001 | 
| 
                           | 41,300 |  | 67,198 |  | 125,800 |  | 187,247 | 
| 
                          
                             | 41,300 |  | 67,198 |  | 125,800 |  | 187,247 | 
| Kittila | 55,000 |  | 59,464 |  | 162,000 |  | 171,448 | 
| 
                          
                             | 55,000 |  | 59,464 |  | 162,000 |  | 171,448 | 
| 
                           | 21,734 |  | 23,700 |  | 59,573 |  | 69,510 | 
| 
                          La  | — |  | 5,400 |  | — |  | 24,620 | 
| 
                          
                             | 21,734 |  | 29,100 |  | 59,573 |  | 94,130 | 
|  |  |  |  |  |  |  |  | 
| Corporate and Other | 4,547 |  | — |  | 4,547 |  | — | 
|  |  |  |  |  |  |  |  | 
| Total gold (ounces): | 868,563 |  | 855,899 |  | 2,558,363 |  | 2,609,192 | 
|  |  |  |  |  |  |  |  | 
| Silver (thousands of ounces) | 653 |  | 573 |  | 1,754 |  | 1,814 | 
| Zinc (tonnes) | 1,977 |  | 1,748 |  | 6,180 |  | 4,802 | 
| Copper (tonnes) | 1,438 |  | 806 |  | 3,998 |  | 2,681 | 
|  |  |  |  |  |  |  |  | 
| Notes: | |||||||
| (i) Operating margin is not a recognized measure under IFRS Accounting Standards and this data may not be comparable to data reported by other gold producers. See Note Regarding Certain Measures of Performance– Operating Margin for more information on the Company's calculation and use of operating margin. | |||||||
| (ii) Payable production (a non-GAAP non-financial performance measure) is the quantity of mineral produced during a period contained in products that are or will be sold by the Company, whether such products are sold during the period or held as inventories at the end of the period. For the three months ended September 30, 2025, it excludes 945 payable gold ounces produced at La India and 189 payable gold ounces produced at Creston Mascota as well as 2,442 ounces of gold recovered at Hope Bay. For the nine months ended September 30, 2025, it excludes 3,614 payable gold ounces produced at La India and 253 payable gold ounces produced at Creston Mascota as well as 2,442 ounces of gold recovered at Hope Bay. | |||||||
| 
                          (iii) Canadian Malartic payable metal sold excludes the  | 
| AGNICO EAGLE MINES LIMITED | |||
| CONDENSED INTERIM CONSOLIDATED BALANCE SHEETS | |||
| 
                          
                            (thousands of  | |||
| (Unaudited) | |||
|  |  |  |  | 
|  | As at |  | As at | 
|  | September 30, 2025 |  | December 31, 2024 | 
| ASSETS |  |  |  | 
| Current assets: |  |  |  | 
| Cash and cash equivalents | $ 2,354,759 |  | $ 926,431 | 
| Inventories | 1,716,135 |  | 1,510,716 | 
| Income taxes recoverable | 15,509 |  | 26,432 | 
| Fair value of derivative financial instruments | 19,815 |  | 1,348 | 
| Other current assets | 362,135 |  | 340,354 | 
| Total current assets | 4,468,353 |  | 2,805,281 | 
| Non-current assets: |  |  |  | 
| Goodwill | 4,157,672 |  | 4,157,672 | 
| Property, plant and mine development | 22,172,275 |  | 21,466,499 | 
| Investments | 952,346 |  | 612,889 | 
| Deferred income and mining tax asset | 24,784 |  | 29,198 | 
| Other assets | 911,483 |  | 915,479 | 
| Total assets | $ 32,686,913 |  | $ 29,987,018 | 
|  |  |  |  | 
| LIABILITIES |  |  |  | 
| Current liabilities: |  |  |  | 
| Accounts payable and accrued liabilities | $ 1,064,013 |  | $ 817,649 | 
| Share based liabilities | 36,299 |  | 27,290 | 
| Interest payable | 2,719 |  | 5,763 | 
| Income taxes payable | 841,710 |  | 372,197 | 
| Current portion of long-term debt | — |  | 90,000 | 
| Reclamation provision | 104,102 |  | 58,579 | 
| Lease obligations | 39,694 |  | 40,305 | 
| Fair value of derivative financial instruments | 19,193 |  | 100,182 | 
| Total current liabilities | 2,107,730 |  | 1,511,965 | 
| Non-current liabilities: |  |  |  | 
| Long-term debt | 195,994 |  | 1,052,956 | 
| Reclamation provision | 1,236,085 |  | 1,026,628 | 
| Lease obligations | 99,856 |  | 98,921 | 
| Share based liabilities | 19,843 |  | 12,505 | 
| Deferred income and mining tax liabilities | 5,259,773 |  | 5,162,249 | 
| Other liabilities | 260,175 |  | 288,894 | 
| Total liabilities | 9,179,456 |  | 9,154,118 | 
|  |  |  |  | 
| EQUITY |  |  |  | 
| Common shares: |  |  |  | 
| Outstanding - 502,544,235 common shares issued, less 497,673 shares held in trust | 18,812,225 |  | 18,675,660 | 
| Stock options | 165,569 |  | 172,145 | 
| Retained earnings | 4,368,424 |  | 2,026,242 | 
| Other reserves | 161,239 |  | (41,147) | 
| Total equity | 23,507,457 |  | 20,832,900 | 
| Total liabilities and equity | $ 32,686,913 |  | $ 29,987,018 | 
| AGNICO EAGLE MINES LIMITED | |||||||
| CONDENSED INTERIM CONSOLIDATED STATEMENTS OF INCOME | |||||||
| (thousands of United States dollars, except per share amounts) | |||||||
| (Unaudited) | |||||||
|  |  |  |  |  |  |  |  | 
|  | Three Months Ended September 30, |  | Nine Months Ended September 30, | ||||
|  | 2025 |  | 2024 |  | 2025 |  | 2024 | 
|  |  |  |  |  |  |  |  | 
| REVENUES |  |  |  |  |  |  |  | 
| Revenues from mining operations | 
                           |  | 
                           |  | 
                           |  | $ 6,062,053 | 
|  |  |  |  |  |  |  |  | 
| COSTS, INCOME AND EXPENSES |  |  |  |  |  |  |  | 
| Production(i) | 839,321 |  | 783,653 |  | 2,396,241 |  | 2,339,222 | 
| Exploration and corporate development | 59,630 |  | 60,335 |  | 153,535 |  | 166,788 | 
| Amortization of property, plant and mine development | 429,947 |  | 390,245 |  | 1,223,703 |  | 1,125,859 | 
| General and administrative | 67,761 |  | 48,500 |  | 186,360 |  | 145,436 | 
| Finance costs | 24,154 |  | 28,527 |  | 74,027 |  | 99,265 | 
| Loss (gain) on derivative financial instruments | 20,242 |  | (17,153) |  | (173,881) |  | 48,390 | 
| Foreign currency translation (gain) loss | (6,559) |  | 3,436 |  | (18,190) |  | (748) | 
| Care and maintenance | 17,866 |  | 13,810 |  | 47,449 |  | 35,078 | 
| Other expenses | 31,599 |  | 4,466 |  | 67,876 |  | 63,719 | 
| Income before income and mining taxes | 1,575,568 |  | 839,790 |  | 4,386,758 |  | 2,039,044 | 
| Income and mining taxes expense | 520,610 |  | 272,672 |  | 1,448,358 |  | 652,718 | 
| Net income for the period | 
                           |  | $ 567,118 |  | 
                           |  | $ 1,386,326 | 
|  |  |  |  |  |  |  |  | 
| Net income per share - basic | $ 2.10 |  | $ 1.13 |  | $ 5.85 |  | $ 2.78 | 
| Net income per share - diluted | $ 2.10 |  | $ 1.13 |  | $ 5.83 |  | $ 2.77 | 
| Adjusted net income per share - basic(ii) | $ 2.16 |  | $ 1.14 |  | $ 5.64 |  | $ 2.97 | 
| Adjusted net income per share - diluted(ii) | $ 2.16 |  | $ 1.14 |  | $ 5.62 |  | $ 2.97 | 
|  |  |  |  |  |  |  |  | 
| Weighted average number of common shares outstanding (in thousands): |  |  |  |  |  |  |  | 
| Basic | 502,178 |  | 500,974 |  | 502,389 |  | 499,343 | 
| Diluted | 503,539 |  | 502,106 |  | 503,768 |  | 500,196 | 
|  |  |  |  |  |  |  |  | 
| Notes: | |||||||
| (i) Exclusive of amortization, which is shown separately | |||||||
| (ii) Adjusted net income per share is not a recognized measure under IFRS Accounting Standards and this data may not be comparable to data reported by other companies. SeeNote Regarding Certain Measures of Performance – Adjusted Net Income and Adjusted Net Income per Share for a discussion of the composition and usefulness of this measure and a reconciliation to the nearest IFRS Accounting Standards measure | 
| AGNICO EAGLE MINES LIMITED | |||||||
| CONDENSED INTERIM CONSOLIDATED STATEMENTS OF CASH FLOWS | |||||||
| (thousands of United States dollars) | |||||||
| (Unaudited) | |||||||
|  |  |  |  |  |  |  |  | 
|  | Three Months Ended September 30, |  | Nine Months Ended September 30, | ||||
|  | 2025 |  | 2024 |  | 2025 |  | 2024 | 
|  |  |  |  |  |  |  |  | 
| OPERATING ACTIVITIES |  |  |  |  |  |  |  | 
| Net income for the period | 
                           |  | $ 567,118 |  | 
                           |  | 
                           | 
| Add (deduct) adjusting items: |  |  |  |  |  |  |  | 
| Amortization of property, plant and mine development | 429,947 |  | 390,245 |  | 1,223,703 |  | 1,125,859 | 
| Deferred income and mining taxes | 64,616 |  | 58,641 |  | 74,341 |  | 152,788 | 
| Unrealized loss (gain) on currency and commodity derivatives | 50,343 |  | (24,169) |  | (99,455) |  | 38,363 | 
| Unrealized gain on warrants | (25,613) |  | (53) |  | (87,044) |  | (3,903) | 
| Stock-based compensation | 37,913 |  | 21,242 |  | 86,695 |  | 58,957 | 
| Foreign currency translation (gain) loss | (6,559) |  | 3,436 |  | (18,190) |  | (748) | 
| Other | 55,639 |  | 11,010 |  | 84,270 |  | 33,144 | 
| Changes in non-cash working capital balances: |  |  |  |  |  |  |  | 
| Income taxes | 189,741 |  | 95,930 |  | 491,108 |  | 142,732 | 
| Inventories | (143,052) |  | (156,871) |  | (165,196) |  | (165,727) | 
| Other current assets | (11,022) |  | 41,263 |  | (17,784) |  | (16,237) | 
| Accounts payable and accrued liabilities | 122,303 |  | 80,704 |  | 198,893 |  | 74,622 | 
| Interest payable | (3,339) |  | (3,964) |  | (4,132) |  | 2,867 | 
| Cash provided by operating activities | 1,815,875 |  | 1,084,532 |  | 4,705,609 |  | 2,829,043 | 
|  |  |  |  |  |  |  |  | 
| INVESTING ACTIVITIES |  |  |  |  |  |  |  | 
| Additions to property, plant and mine development | (626,330) |  | (464,101) |  | (1,616,930) |  | (1,255,786) | 
| Purchase of O3 Mining, net of cash and cash equivalents acquired | — |  | — |  | (121,960) |  | — | 
| Contributions for acquisition of mineral assets | — |  | (4,197) |  | (8,400) |  | (11,296) | 
| Purchase of equity securities and other investments | (60,142) |  | (73,341) |  | (198,503) |  | (114,644) | 
| Proceeds on sale of equity securities and other investments | 402,720 |  | — |  | 402,720 |  | — | 
| Other investing activities | (4,312) |  | 3,706 |  | (5,867) |  | 6,169 | 
| Cash used in investing activities | (288,064) |  | (537,933) |  | (1,548,940) |  | (1,375,557) | 
|  |  |  |  |  |  |  |  | 
| FINANCING ACTIVITIES |  |  |  |  |  |  |  | 
| Proceeds from Credit Facility | — |  | — |  | — |  | 600,000 | 
| Repayment of Credit Facility | — |  | — |  | — |  | (600,000) | 
| Repayment of Term Loan Facility | — |  | (275,000) |  | — |  | (275,000) | 
| Repayment of Senior Notes | (400,000) |  | (100,000) |  | (950,000) |  | (100,000) | 
| Debt financing and extinguishment costs | (8,245) |  | — |  | (8,245) |  | (3,544) | 
| Repayment of lease obligations | (8,620) |  | (12,461) |  | (26,970) |  | (38,142) | 
| Dividends paid | (186,350) |  | (176,314) |  | (542,695) |  | (497,829) | 
| Repurchase of common shares | (149,855) |  | (30,080) |  | (309,843) |  | (106,121) | 
| Proceeds on exercise of stock options | 10,411 |  | 90,923 |  | 72,257 |  | 178,735 | 
| Common shares issued | 10,539 |  | 9,387 |  | 31,255 |  | 28,088 | 
| Cash used in financing activities | (732,120) |  | (493,545) |  | (1,734,241) |  | (813,813) | 
| Effect of exchange rate changes on cash and cash equivalents | 1,503 |  | 2,172 |  | 5,900 |  | (1,106) | 
| Net increase in cash and cash equivalents during the period | 797,194 |  | 55,226 |  | 1,428,328 |  | 638,567 | 
| Cash and cash equivalents, beginning of period | 1,557,565 |  | 921,989 |  | 926,431 |  | 338,648 | 
| Cash and cash equivalents, end of period | 
                           |  | $ 977,215 |  | 
                           |  | $ 977,215 | 
|  |  |  |  |  |  |  |  | 
| SUPPLEMENTAL CASH FLOW INFORMATION |  |  |  |  |  |  |  | 
| Interest paid | $ 7,795 |  | $ 26,870 |  | $ 46,213 |  | $ 76,773 | 
| Income and mining taxes paid | $ 261,403 |  | $ 119,178 |  | $ 877,708 |  | $ 377,555 | 
                   View original content to download multimedia:https://www.prnewswire.com/news-releases/agnico-eagle-reports-third-quarter-2025-results--record-adjusted-net-income-with-another-quarter-of-strong-production-financial-position-further-strengthened-by-repayment-of-long-term-debt-and-cash-accumulation-302598835.html
 View original content to download multimedia:https://www.prnewswire.com/news-releases/agnico-eagle-reports-third-quarter-2025-results--record-adjusted-net-income-with-another-quarter-of-strong-production-financial-position-further-strengthened-by-repayment-of-long-term-debt-and-cash-accumulation-302598835.html
SOURCE Agnico Eagle Mines Limited
 
             
             
             
             
             
             
             
             
         
         
         
         
                    