STOCK TITAN

Atico Produces 2.09 Million Pounds of Cu and 2,108 Ounces of Au in First Quarter 2026

(Moderate)
(Positive)
Tags

Atico Mining (OTCQX: ATCMF) reported Q1 2026 production from El Roble: 2.09 million lbs Cu and 2,108 oz Au in concentrates, versus Q1 2025 (-6% Cu, +36% Au). Mill throughput averaged 734 tpd, copper grade 1.86% and gold grade 1.69 g/t. Recoveries were 91.0% Cu and 69.1% Au. The company completed two concentrate shipments; sales totaled 8,789 dmt, leaving closing inventory of 1,266 dmt. Proven and Probable reserves total 828,000 tonnes averaging 2.49% Cu and 2.20 g/t Au, with life of mine noted to Q1-2027.

Loading...
Loading translation...

Positive

  • Gold production +36% year-over-year (2,108 oz)
  • Gold recovery improved 10% to 69.1%
  • Completed two concentrate shipments; sales 8,789 dmt
  • Proven and Probable reserves of 828,000 tonnes (2.49% Cu, 2.20 g/t Au)

Negative

  • Copper production down 6% year-over-year (2.09 million lbs)
  • Average throughput 734 tpd versus 1,000 tpd nominal capacity
  • Copper head grade declined 6% to 1.86%

News Market Reaction – ATCMF

-4.10%
-4.10% Session close to close

In the Apr 29 session, ATCMF declined 4.10%, reflecting a moderate negative market reaction.

Data tracked by StockTitan Argus on the day of publication.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

VANCOUVER, British Columbia, April 28, 2026 (GLOBE NEWSWIRE) -- Atico Mining Corporation (the “Company” or “Atico”) (TSX.V: ATY | OTCQX: ATCMF) announces its operating results for the three months ended March 31, 2026 from its El Roble mine. Production for the quarter totaled 2.09 million pounds of copper and 2,108 ounces of gold in concentrates, a decrease of 6% for copper and an increase of 36% for gold, respectively, over the same period in 2025.

“The El Roble mine performed slightly below plan during the quarter, even though gold production was above budget. We achieved a competitive operating cost and clear improvements are already visible in the second period as operations are back on track to meet our full-year guidance,” said Fernando E. Ganoza, CEO. “During the quarter, we successfully completed the sale of two concentrate shipments, combined with record metal prices, positions us to deliver robust financial results.”

First Quarter Operational Highlights

  • Production of 2.09 million pounds of copper contained in concentrates; a decrease of 6% over Q1 2025.
  • Production of 2,108 ounces of gold contained in concentrates; an increase of 36% over Q1 2025.
  • Average processed tonnes per day of 734, a decrease of 5% over Q1 2025.
  • Copper head grade of 1.86%, a decrease of 6% over Q1 2025.
  • Gold head grade of 1.69 grams per tonne; an increase of 20% over Q1 2025.
  • Copper and gold recovery of 91.0% and 69.1%; a decrease of 3% for copper and an increase of 10% for gold, over Q1 2025.

First Quarter Operational Details

 Q1 2026 Total Q1 2025 Total % Change 
Production(Contained in Concentrates)      
Copper (000s pounds)2,090 2,230 -6% 
Gold (ounces)2,108 1,553 36% 
Mine      
Tonnes of ore mined56,629 56,467 Nil 
Mill      
Tonnes processed56,033 54,978 2% 
Tonnes processed per day734 773 -5% 
Copper grade (%)1.86 1.97 -6% 
Gold grade (g/t)1.69 1.40 20% 
Recoveries      
Copper (%)91.0 93.6 -3% 
Gold (%)69.1 62.7 10% 
Concentrates      
Copper and Gold Concentrates (dmt)5,223 5,763 -9% 
       
Payable copper produced (000s lbs)1,967 2,091 -6% 

Note: Metal production figures are subject to adjustments based on final settlement. The reported results are preliminary in nature and are awaiting independent lab verification.

Concentrate Inventory

The number of shipments the Company can export in any given quarter depends on several variables some of which the Company does not control, hence there may be an inherent variability in tonnes shipped quarter to quarter.

 Q1 2026 
Amounts in dry metric tonnes  
Opening inventory4,832 
Production5,223 
Sales-8,789 
Adjustments0 
Closing inventory1,266 
Number of shipments2 

Note: Concentrate figures are subject to adjustments based on final surveys and final settlement of sales.

El Roble Mine

The El Roble mine is a high grade, underground copper and gold mine with nominal processing plant capacity of 1,000 tonnes per day, located in the Department of Choco in Colombia. Its commercial product is a copper-gold concentrate.

Since obtaining control of the mine on November 22, 2013, Atico has upgraded the operation from a historical nominal capacity of 400 tonnes per day.

El Roble’s reserves estimate, with an effective date of March 12, 2024, includes Proven and Probable mineral reserves of 828 thousand tonnes averaging 2.49% Cu, 2.20 g/t Au and a life of mine until Q1-2027. A full NI 43-101 technical report is available on SEDAR+. For more information on the reserves estimate refer to SEDAR+ and on the Company’s website.

Mineralization is open at depth and along strike and the Company plans to further test the limits of the deposit. On the larger land package, the Company has identified a prospective stratigraphic contact between volcanic rocks and black and grey pelagic sediments and cherts that has been traced by Atico geologists for ten kilometers. This contact has been determined to be an important control on VMS mineralization on which Atico has identified numerous target areas prospective for VMS type mineralization occurrence, which is the focus of the current surface drill program at El Roble. 

Qualified Person

Mr. Thomas Kelly (SME Registered Member 1696580), advisor to the Company and a qualified person under National Instrument 43-101 standards, is responsible for ensuring that the technical information contained in this news release is an accurate summary of the original reports and data provided to or developed by Atico.

About Atico Mining Corporation
Atico is a growth-oriented Company, focused on exploring, developing and mining copper and gold projects in Latin America. The Company generates significant cash flow through the operation of the El Roble mine and is developing its high-grade La Plata VMS project in Ecuador. The Company is also pursuing additional acquisition of advanced stage opportunities. For more information, please visit www.aticomining.com.

ON BEHALF OF THE BOARD

Fernando E. Ganoza
CEO
Atico Mining Corporation

Trading symbols: TSX.V: ATY | OTCQX: ATCMF

Investor Relations
Igor Dutina
Tel: +1.604.633.9022

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

No securities regulatory authority has either approved or disapproved of the contents of this news release. The securities being offered have not been, and will not be, registered under the United States Securities Act of 1933, as amended (the ‘‘U.S. Securities Act’’), or any state securities laws, and may not be offered or sold in the United States, or to, or for the account or benefit of, a "U.S. person" (as defined in Regulation S of the U.S. Securities Act) unless pursuant to an exemption therefrom. This press release is for information purposes only and does not constitute an offer to sell or a solicitation of an offer to buy any securities of the Company in any jurisdiction.

Cautionary Note Regarding Forward Looking Statements

This announcement includes certain “forward-looking statements” within the meaning of Canadian securities legislation. All statements, other than statements of historical fact, included herein, without limitation the use of net proceeds, are forward-looking statements. Forward-looking statements involve various risks and uncertainties and are based on certain factors and assumptions. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company’s expectations include uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; uncertainty of estimates of capital and operating costs; the need to obtain additional financing to maintain its interest in and/or explore and develop the Company’s mineral projects; uncertainty of meeting anticipated program milestones for the Company’s mineral projects; and other risks and uncertainties disclosed under the heading “Risk Factors” in the AIF of the Company dated September 4, 2024 filed with the Canadian securities regulatory authorities on the SEDAR+ website at www.sedarplus.com


FAQ

How much copper and gold did Atico (ATCMF) produce in Q1 2026?

Atico produced 2.09 million pounds of copper and 2,108 ounces of gold in Q1 2026. According to the company, these figures are contained in concentrates and are preliminary pending final settlement.

What changes in grades and recoveries did ATCMF report for Q1 2026?

Q1 2026 copper grade was 1.86% and gold grade 1.69 g/t. According to the company, copper recovery was 91.0% and gold recovery 69.1%, with recoveries compared to Q1 2025.

What concentrate inventory and shipments did Atico report for Q1 2026 (ATCMF)?

Atico reported opening inventory 4,832 dmt, production 5,223 dmt, sales 8,789 dmt, and closing inventory 1,266 dmt. According to the company, two shipments were completed in the quarter.

What is the El Roble reserve and life-of-mine position disclosed by Atico (ATCMF)?

Proven and Probable reserves are 828,000 tonnes averaging 2.49% Cu and 2.20 g/t Au. According to the company, the reserve estimate implies a life of mine to Q1-2027.

How did mill throughput in Q1 2026 compare to nominal capacity at El Roble (ATCMF)?

Mill throughput averaged 734 tonnes per day in Q1 2026 versus a nominal plant capacity of 1,000 tpd. According to the company, capacity has been upgraded since 2013 but throughput varies by quarter.

Did Atico (ATCMF) report any sales or financial positioning in Q1 2026?

The company completed two concentrate shipments and reported significant sales volume in Q1 2026. According to the company, combined with strong metal prices, this positions results to be financially robust.