Antimony Resources Corp. reports recurring developments tied to exploration of the Bald Hill Antimony Project in New Brunswick, Canada. Company news centers on antimony-bearing stibnite mineralization, drilling and trenching at the Main Zone and Marcus (West) Zone, soil sampling on surrounding claim blocks, 3-D mineralization modeling, and technical work related to metallurgical, environmental, and permitting studies.
Updates also include Canadian mineral-disclosure matters, including NI 43-101 technical reporting for Bald Hill, as well as capital-structure and governance announcements. The company’s disclosures emphasize exploration results, project de-risking work, regulatory engagement, and the potential development pathway for the Bald Hill antimony project.
Antimony Resources (OTCQB: ATMYF) reported results from 550+ soil samples on the Second Run Claim Block, ~3 km south of Bald Hill. Soil anomalies include three target areas (SR1, SR2, SR3) with antimony (Sb) up to >450 ppm (reported as >40x background).
Company interpretation links anomalies to fault zones; follow-up work planned includes expanded soils, prospecting, trenching, airborne geophysics and possible drilling. Property expanded by 12 claim units west of SR1.
Antimony Resources (OTCQB: ATMYF) reported assay results from drill hole BH-25-34, returning 4.38% Sb over 7.05 m including 9.76% Sb over 3.15 m. The 2025 program completed >8,000 m (34 holes), extending the Bald Hill Main Zone >600 m strike and to ~400 m depth. A 3-D model was updated and a definition drill program continued into 2026.
Antimony Resources (OTCQB: ATMYF) has begun technical and environmental studies to advance permitting of the Bald Hill antimony project in southern New Brunswick. The company engaged GEMTEC to produce a regulatory Roadmap to Permitting, begin baseline environmental surveys this spring, and lead Indigenous and public engagement.
The project targets a previously reported NI 43-101 conceptual area of about 2.7 million tonnes @ 3–4% antimony, while noting additional work is required to confirm a mineral resource.
Antimony Resources (OTCQB: ATMYF) reports continued surface and drill discovery at the Bald Hill project in New Brunswick. Trenching has extended a new Marcus (West) stibnite exposure to ~80 meters and trenching 30 meters south of the Discovery Boulder uncovered massive stibnite in bedrock.
Definition drilling has reached ~6,500 metres of a planned 10,000-metre program, while the Main Zone remains defined over ~700 metres length and to ~350 metres depth with typical widths of 3–4 metres and grades averaging 3%–4% antimony.
Antimony Resources (OTCQB: ATMYF) has launched a 10,000-meter definition drilling program at the Bald Hill antimony deposit to support a maiden Mineral Resource Estimate (MRE).
Approximately 5,000 meters have been completed with three drills onsite; remaining drilling aims to finish by end of April with final assays 3–4 weeks after drill completion. SRK Consultants Toronto has been contracted to complete the MRE and develop the 3-D resource model.
Antimony Resources (OTCQB: ATMYF) has begun a 10,000-meter drill program at Bald Hill, with 4,000 meters completed focusing on the Main Zone where massive antimony-bearing stibnite was intersected. Main Zone extends ~700 m laterally to ~350 m depth; widths average 3–4 m at grades ~3–4% Sb. A 2010 trench in the Central Zone returned up to 8.47% Sb over 1.53 m. A NI 43-101 report targets ~2.7 million tonnes at 3–4% Sb; the company notes further work is required to confirm a mineral resource.
Antimony Resources (OTCQB: ATMYF) is clarifying its November 7, 2025 Bald Hill Technical Report after a review by the British Columbia Securities Commission.
The company says the filed report does not include NI 43-101‑compliant mineral resources or a target; a revised technical report will be prepared and filed on SEDAR+ after BCSC review.
Antimony Resources (OTCQB: ATMYF) reports expanded antimony-bearing stibnite mineralization at the Marcus (West) Zone at Bald Hill, found by trenching and surface exposure.
Company plans immediate shallow drilling (up to six holes, 30–50m) as part of a 2026 program alongside a 10,000‑metre Main Zone drill campaign; a 2025 NI 43-101 identified a target of ~2.7 million tonnes at 3–4% Sb, described as conceptual.
Antimony Resources (OTCQB: ATMYF) announced investors exercised 6,104,400 warrants for gross proceeds of $1,212,704 since November 30, 2025. Combined with a closed $9,450,000 financing, the funds will support exploration of the Bald Hill Antimony Project and working capital.
Bald Hill highlights: drill-defined mineralization over 700 m, average widths ~3–4 m, and reported grades of 3–4% Sb. A 2025 NI 43-101 technical report estimates ~2.7 million tonnes (3–4% Sb) as a conceptual target; further work is required to confirm a mineral resource.
Antimony Resources (OTCQB: ATMYF) discovered expanded massive stibnite mineralization at the Marcus (West) Zone, with bedrock exposure over a 25-meter distance and trenching showing South Zone mineralization over 150 meters.
A 2026 definition drill program (currently two rigs, third added early February) targets the Bald Hill Main Zone along 600 meters to depths of at least 300 meters, aiming to support a Maiden Resource. A 2025 NI 43-101 technical report cites an approximate target of 2.7 million tonnes at 3–4% Sb, but the company notes this is conceptual and unconfirmed.