STOCK TITAN

Austin Gold Reports Results of CSAMT Survey and Advances Drill Targeting at Stockade Mountain

(Neutral)
Tags

Austin Gold (NYSE American:AUST) reported finalized results from a late-2025 CSAMT survey at the Stockade Mountain gold project in Oregon. The known Opal Hill / Number 9 Vein system coincides with a prominent resistivity high, validating the method and revealing multiple additional resistivity highs and structural contrast zones as potential drill targets.

Austin Gold also received authorization to drill a water supply well to support future exploration and has terminated its interest in the Kelly Creek Project in Nevada, reallocating technical and financial resources to its remaining core exploration assets.

Loading...
Loading translation...

Positive

  • CSAMT survey identifies multiple new resistivity highs as drill targets
  • Known Opal Hill / Number 9 Vein aligns with prominent resistivity high
  • Water well drilling authorization secured for future exploration needs
  • Portfolio refocused by exiting Kelly Creek to prioritize core projects

Negative

  • Interest in Kelly Creek Project terminated effective June 1, 2026

News Market Reaction – AUST

+6.87%
12 alerts
+6.87% Session close to close
+4.3% Peak in 58 min
$19.85M Market Cap
1.5x Rel. Volume

In the Jun 2 session, AUST gained 6.87%, reflecting a notable positive market reaction. Argus tracked a peak move of +4.3% during that session. Our momentum scanner triggered 12 alerts that day, indicating notable trading interest and price volatility.

Data tracked by StockTitan Argus on the day of publication.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

Highlights

  • Interpretation of the Controlled Source Audio-Frequency Magnetotellurics ("CSAMT") survey completed in late 2025 has been finalized.
  • The known Opal Hill / Number 9 Vein gold-bearing stockwork system is associated with a prominent resistivity high, supporting the effectiveness of the CSAMT method at Stockade Mountain.
  • Multiple additional resistivity highs and structural contrast zones have been identified and are being evaluated as potential drill targets.
  • Austin has received authorization from the Oregon Water Resources Department to drill a water well to support future exploration drilling activities.
  • The Company has terminated its interest in the Kelly Creek Project in Nevada and will focus its efforts on its core exploration assets.

Vancouver, British Columbia--(Newsfile Corp. - June 2, 2026) - Austin Gold Corp. (NYSE American: AUST) ("Austin" or the "Company") is pleased to provide an update on exploration activities at its Stockade Mountain Project in Malheur County, Oregon.

Robert Hatch, VP Exploration of Austin Gold, commented:

"The CSAMT survey has significantly improved our understanding of the subsurface geology at Stockade Mountain. Importantly, the survey successfully identified the known Opal Hill / Number 9 Vein mineralized system as a prominent resistivity feature. The presence of additional resistivity highs and structural contrast zones elsewhere on the property provides several compelling targets for further evaluation and potential drilling. We believe these results represent an important step toward unlocking the broader potential of the Stockade Mountain Project. We have also streamlined our project portfolio through the termination of our interest in Kelly Creek, allowing management to focus on projects that best align with Austin's exploration objectives."

Stockade Mountain Project Update

As previously reported, a Controlled Source Audio-Frequency Magnetotellurics (CSAMT) survey was conducted by Zonge International during November and December 2025 at the Company's Stockade Mountain Project in Malheur County, Oregon. Stockade Mountain hosts a low-sulfidation epithermal gold system in a geological setting similar to the nearby Grassy Mountain gold deposit.

The survey comprised 17 lines totaling approximately 40.8 line-kilometres. Individual survey lines were approximately 2.4 kilometres in length and spaced 200 metres apart. The lines were oriented northeast-southwest, approximately perpendicular to the interpreted orientation of the hydrothermal system and major structural controls.

CSAMT is a geophysical method used to map variations in subsurface electrical resistivity. In epithermal gold systems such as Stockade Mountain, resistivity contrasts may reflect variations in alteration, lithology, structure, and fluid pathways. Zones of elevated resistivity may be associated with silicification or competent volcanic units, while lower resistivity responses may reflect clay alteration, porous sedimentary rocks, or water-saturated volcanic units.

Interpretation of the two-dimensional inversion sections and plan-view resistivity maps indicates considerable geological complexity beneath the project area. The known Opal Hill / Number 9 Vein stockwork mineralization is associated with a prominent resistivity high. Additional resistivity highs and significant resistivity contrast zones have been identified elsewhere within the survey area and may represent prospective structural or lithological targets for future exploration.

Several of the newly identified targets exhibit characteristics similar to the geophysical response associated with known mineralization at the Opal Hill / Number 9 Vein target area. These targets, together with major structural contrast zones identified by the survey, are being incorporated into the Company's ongoing geological interpretation and target-ranking process.

The Company believes the CSAMT survey has improved its understanding of the subsurface geology and will assist in refining future drill targeting.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/9021/299715_0ad0c967d4d858e3_002.jpg

Image 1: CSAMT resistivity interpretation showing the Opal Hill / Number 9 Vein target area and selected resistivity anomalies identified for follow-up evaluation

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/9021/299715_0ad0c967d4d858e3_002full.jpg

Water Supply Well

The Company has received authorization from the Oregon Water Resources Department to drill a water well intended to supply water for future exploration drilling programs. Drilling of the well is expected to commence when a suitable contractor becomes available.

Kelly Creek Project

Effective June 1, 2026, the Company terminated its interest in the Exploration and Option to Enter Joint Venture Agreement, as amended, for the Kelly Creek Project in Humboldt County, Nevada.

Following a review of the Company's exploration portfolio and strategic priorities, management determined that the Kelly Creek Project no longer aligns with the Company's exploration objectives. The Company will continue to focus its technical and financial resources on advancing its remaining exploration projects.

Qualified Person

Robert M. Hatch, the Qualified Person for Austin Gold as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects, has reviewed and approved the scientific and technical information contained in this news release.

About Austin Gold Corp.

Austin is a gold exploration company focused on making district-scale gold discoveries in the southwestern United States.

The Company's Stockade Mountain Project in Malheur County, Oregon, consists of approximately 10.5 square miles (27.2 km²) of unpatented mining claims situated within a geological setting similar to the nearby Grassy Mountain gold deposit.

For further information, please contact:

Darcy A. Higgs
Vice President, Business Development
Tel: 604-644-6580
Email: info@austin.gold
Website: www.austin.gold

Forward-Looking Statements

This news release contains forward-looking statements within the meaning of applicable securities laws. Forward-looking statements include, but are not limited to, statements regarding the Company's exploration plans, interpretation of geophysical data, future drilling activities, timing of water well construction, advancement of the Stockade Mountain Project, and other future events or expectations. Forward-looking statements are subject to various risks, uncertainties, and assumptions that could cause actual results to differ materially from those expressed or implied by such statements. Readers are cautioned not to place undue reliance on forward-looking statements. The Company undertakes no obligation to update or revise any forward-looking statements except as required by applicable law.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/299715

FAQ

What did Austin Gold (AUST) announce about the Stockade Mountain CSAMT survey on June 2, 2026?

Austin Gold reported finalized CSAMT survey results that improved understanding of subsurface geology and outlined new drill targets. According to Austin Gold, the survey mapped multiple resistivity highs and contrast zones that may represent prospective structural or lithological targets at the Stockade Mountain gold project.

How does the CSAMT survey support drill targeting at Austin Gold’s AUST Stockade Mountain project?

The CSAMT survey outlined prominent resistivity highs and contrast zones that guide future drilling locations. According to Austin Gold, the known Opal Hill / Number 9 Vein mineralized system coincides with a strong resistivity high, and several similar anomalies elsewhere are being evaluated as potential drill targets.

What water well authorization did Austin Gold (AUST) receive for Stockade Mountain?

Austin Gold received authorization to drill a water supply well to support future exploration drilling programs. According to Austin Gold, drilling of this well at Stockade Mountain is expected to start once a suitable contractor is available, helping secure essential water for ongoing and future drill campaigns.

Why did Austin Gold (AUST) terminate its interest in the Kelly Creek Project in Nevada?

Austin Gold ended its interest in the Kelly Creek Project effective June 1, 2026, following a portfolio review. According to Austin Gold, management concluded Kelly Creek no longer aligns with its exploration objectives and will concentrate technical and financial resources on remaining exploration projects considered core assets.

What is the significance of the Opal Hill / Number 9 Vein area in Austin Gold’s AUST Stockade Mountain results?

The Opal Hill / Number 9 Vein area validates the CSAMT method by matching known mineralization with a resistivity high. According to Austin Gold, several newly identified targets show geophysical characteristics similar to this area and are being integrated into ongoing geological interpretation and target ranking.

How many CSAMT survey lines were completed at Austin Gold’s Stockade Mountain project?

The CSAMT survey at Stockade Mountain comprised 17 lines totaling about 40.8 line-kilometres. According to Austin Gold, individual lines were roughly 2.4 kilometres long, spaced 200 metres apart, and oriented northeast-southwest, perpendicular to the interpreted hydrothermal system and major structural controls.