STOCK TITAN

Bear Creek Mining Files NI 43-101 Technical Report for Mercedes Mine

Rhea-AI Impact
(Low)
Rhea-AI Sentiment
(Neutral)
Tags

Bear Creek Mining (BCEKF) has filed a Technical Report for its Mercedes gold and silver mine in Sonora, Mexico. The report, dated September 30, 2024, was prepared by Global Resource Engineering (GRE) and supports the previously announced updated Mercedes Mineral Resource and Mineral Reserve estimates from January 29, 2025.

The Technical Report, titled 'NI 43-101 Technical Report, Mercedes Gold - Silver Mine, Sonora State, Mexico,' contains no material differences from the January 29, 2025 News Release. Both documents are publicly available on SEDAR+ and the company's website.

The report was prepared by a team of Qualified Persons including experts in mining engineering, metallurgy, geology, environmental engineering, and geotechnical engineering from GRE and Bear Creek Mining

Bear Creek Mining (BCEKF) ha presentato un Rapporto Tecnico per la sua miniera d'oro e argento Mercedes in Sonora, Messico. Il rapporto, datato 30 settembre 2024, è stato redatto da Global Resource Engineering (GRE) e supporta le stime aggiornate delle Risorse Minerarie e delle Riserve Minerarie di Mercedes annunciate in precedenza il 29 gennaio 2025.

Il Rapporto Tecnico, intitolato 'Rapporto Tecnico NI 43-101, Miniera d'Oro - Argento Mercedes, Stato di Sonora, Messico,' non presenta differenze sostanziali rispetto al Comunicato Stampa del 29 gennaio 2025. Entrambi i documenti sono disponibili pubblicamente su SEDAR+ e sul sito web dell'azienda.

Il rapporto è stato redatto da un team di Persone Qualificate, tra cui esperti in ingegneria mineraria, metallurgia, geologia, ingegneria ambientale e ingegneria geotecnica provenienti da GRE e Bear Creek Mining.

Bear Creek Mining (BCEKF) ha presentado un Informe Técnico para su mina de oro y plata Mercedes en Sonora, México. El informe, fechado el 30 de septiembre de 2024, fue preparado por Global Resource Engineering (GRE) y respalda las estimaciones actualizadas de Recursos Minerales y Reservas Minerales de Mercedes anunciadas previamente el 29 de enero de 2025.

El Informe Técnico, titulado 'Informe Técnico NI 43-101, Mina de Oro - Plata Mercedes, Estado de Sonora, México,' no contiene diferencias materiales con respecto al Comunicado de Prensa del 29 de enero de 2025. Ambos documentos están disponibles públicamente en SEDAR+ y en el sitio web de la empresa.

El informe fue preparado por un equipo de Personas Calificadas, incluidos expertos en ingeniería minera, metalurgia, geología, ingeniería ambiental e ingeniería geotécnica de GRE y Bear Creek Mining.

Bear Creek Mining (BCEKF)는 멕시코 소노라에 있는 메르세데스 금 및 은 광산에 대한 기술 보고서를 제출했습니다. 이 보고서는 2024년 9월 30일자로 작성되었으며, Global Resource Engineering (GRE)에서 준비하였고, 2025년 1월 29일에 발표된 메르세데스 광물 자원 및 광물 매장량 추정치를 지원합니다.

이 기술 보고서는 'NI 43-101 기술 보고서, 메르세데스 금 - 은 광산, 소노라 주, 멕시코'라는 제목을 가지고 있으며, 2025년 1월 29일자 보도자료와 실질적인 차이가 없습니다. 두 문서 모두 SEDAR+와 회사 웹사이트에서 공개적으로 확인할 수 있습니다.

이 보고서는 GRE와 Bear Creek Mining의 광산 공학, 금속 공학, 지질학, 환경 공학 및 지반 공학 분야의 전문가들로 구성된 자격 있는 팀에 의해 준비되었습니다.

Bear Creek Mining (BCEKF) a déposé un Rapport Technique pour sa mine d'or et d'argent Mercedes dans l'État de Sonora, au Mexique. Le rapport, daté du 30 septembre 2024, a été préparé par Global Resource Engineering (GRE) et soutient les estimations mises à jour des Ressources Minérales et des Réserves Minières de Mercedes annoncées précédemment le 29 janvier 2025.

Le Rapport Technique, intitulé 'Rapport Technique NI 43-101, Mine d'Or - Argent Mercedes, État de Sonora, Mexique,' ne présente aucune différence matérielle par rapport au Communiqué de Presse du 29 janvier 2025. Les deux documents sont disponibles publiquement sur SEDAR+ et le site web de l'entreprise.

Le rapport a été préparé par une équipe de Personnes Qualifiées, comprenant des experts en ingénierie minière, métallurgie, géologie, ingénierie environnementale et ingénierie géotechnique de GRE et Bear Creek Mining.

Bear Creek Mining (BCEKF) hat einen Technischen Bericht für seine Gold- und Silbermine Mercedes in Sonora, Mexiko, eingereicht. Der Bericht, datiert auf den 30. September 2024, wurde von Global Resource Engineering (GRE) erstellt und unterstützt die zuvor am 29. Januar 2025 angekündigten aktualisierten Schätzungen der Mineralressourcen und Mineralreserven von Mercedes.

Der Technische Bericht mit dem Titel 'NI 43-101 Technischer Bericht, Gold - Silbermine Mercedes, Bundesstaat Sonora, Mexiko' weist keine wesentlichen Unterschiede zu der Pressemitteilung vom 29. Januar 2025 auf. Beide Dokumente sind öffentlich auf SEDAR+ und der Website des Unternehmens verfügbar.

Der Bericht wurde von einem Team von qualifizierten Personen erstellt, darunter Experten für Bergbau, Metallurgie, Geologie, Umwelttechnik und geotechnische Ingenieurwissenschaften von GRE und Bear Creek Mining.

Positive
  • None.
Negative
  • None.

Vancouver, British Columbia--(Newsfile Corp. - March 14, 2025) - Bear Creek Mining Corporation (TSXV: BCM) (BVL: BCM) (OTCQX: BCEKF) ("Bear Creek" or the "Company") announces that it has today filed a Technical Report (as defined in National Instrument 43-101) regarding the Company's Mercedes gold and silver mine in Sonora, Mexico, entitled "NI 43-101 Technical Report, Mercedes Gold - Silver Mine, Sonora State, Mexico" (the "2024 Mercedes Report"). The 2024 Mercedes Report is dated effective September 30, 2024 and was prepared on behalf of the Company by Global Resource Engineering Ltd. ("GRE").

The 2024 Mercedes Report supports the updated Mercedes Mineral Resource and Mineral Reserve estimates announced by the Company on January 29, 2025 (the "January 29, 2025 News Release"). There are no material differences between the scientific and technical disclosure contained in the 2024 Mercedes Report and the January 29, 2025 News Release, both of which are available to the public on SEDAR+ (www.sedarplus.ca) and on the Company's website (www.bearcreekmining.com).

On behalf of the Board of Directors,
Eric Caba
President and Chief Executive Officer

For further information contact:
Barbara Henderson - VP Corporate Communications
Direct: 604-628-1111
E-mail: barb@bearcreekmining.com
www.bearcreekmining.com
Subscribe to Bear Creek Mining news

National Instrument 43-101 ("NI 43-101") Disclosure

The 2024 Mercedes Report was prepared on behalf of the Company by Global Resource Engineering Ltd. and the following Qualified Persons ("QP", as defined in NI 43-101): Terre Lane, MMSA and SME Registered Member, Principal Mining Engineer at GRE; Todd Harvey, PhD, PE and SME Registered Member, Principal Metallurgist at GRE; Hamid Samari, PhD, MMSA, Principal Geologist at GRE; Larry Breckenridge, PE (Colorado, USA), Principal Environmental Engineer at GRE; Luis Quirindongo, SME Registered Member, Principal Geotechnical Engineer at GRE; and Donald Mc Iver, FAusIMM Member and FSEG Member, Vice President Exploration and Geology at Bear Creek Mining Corporation. Sections of the 2024 Mercedes Report for which each QP was responsible are provided in the 2024 Mercedes Report. Each of these individuals has read, certified their participation in and consented to the use, public disclosure and filing of the 2024 Mercedes Report.

Caution Regarding Forward-Looking Information
The 2024 Mercedes Report and the January 29, 2025 News Release may contain forward-looking information and forward-looking statements. Please refer to the January 29, 2025 News Release for cautionary statements related to forward-looking information contained therein. Forward-looking information contained in the 2024 Mercedes Report reflects information, estimates, predictions, expectations, assumptions or beliefs regarding future events that were current on the effective date of the document. Although reasonable at the time, the assumptions on which these forward-looking statements were made may prove to be incorrect. By their very nature, forward-looking statements involve inherent risks and uncertainties, both general and specific, and risks exist that estimates, forecasts, projections and other forward-looking statements will not be achieved or that assumptions on which they are based do not reflect future experience. We caution readers not to place undue reliance on these forward-looking statements as a number of important factors could cause the actual outcomes to differ materially from the expectations expressed in them. These risk factors may be generally stated as the risk that the assumptions and estimates used to make such forward-looking statements prove to be incorrect or that one or more risks described in the Company's most recent Annual Information Form come to pass. When relying on forward-looking statements, investors and others should carefully consider the foregoing factors and other uncertainties and potential events. The Company does not undertake to update any forward-looking statement, whether written or oral, that may be made from time to time by the Company or on behalf of the Company, except as required by law.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/244647

FAQ

What is the significance of Bear Creek Mining's (BCEKF) new Technical Report for the Mercedes mine?

The Technical Report validates the updated Mineral Resource and Reserve estimates announced on January 29, 2025, providing detailed technical documentation for the Mercedes gold-silver mine in Sonora, Mexico.

When was the Mercedes mine Technical Report effective date?

The Technical Report has an effective date of September 30, 2024.

Where can investors access Bear Creek Mining's (BCEKF) Mercedes mine Technical Report?

The Technical Report is available on SEDAR+ (www.sedarplus.ca) and Bear Creek Mining's website (www.bearcreekmining.com).

Who prepared the 2024 Technical Report for Bear Creek Mining's Mercedes mine?

Global Resource Engineering (GRE) prepared the Technical Report with a team of qualified experts in mining, metallurgy, geology, and engineering.
Bear Creek Mining

OTC:BCEKF

BCEKF Rankings

BCEKF Latest News

BCEKF Stock Data

41.15M
122.45M
45.5%
10.66%
Gold
Basic Materials
Link
Canada
Vancouver