Results of Share Purchase Plan
Barton Gold Holdings (ASX:BGD / OTCQB:BGDFF) confirmed final results of its Share Purchase Plan (SPP) on 10 November 2025. The SPP opened 23 October 2025 at $1.25 per share, raising $660,000 by issuing 528,000 new shares (including $80,000 from directors). Together with a recent institutional placement of $15m, Barton estimates a pro forma cash balance of $20m.
The company expects to issue the SPP shares on 12 November 2025 with trading from 13 November 2025, leaving a total of 238,489,810 fully paid ordinary shares on issue. Barton said DFS work for Central Gawler Mill Stage 1 and JORC upgrade drilling at Tunkillia Stage 2 are advancing.
Barton Gold Holdings (ASX:BGD / OTCQB:BGDFF) ha confermato i risultati finali del suo Share Purchase Plan (SPP) il 10 novembre 2025. L'SPP è stato aperto il 23 ottobre 2025 a $1,25 per azione, raccogliendo $660,000 emettendo 528.000 nuove azioni (inclusi $80.000 dai membri del consiglio). Insieme a un recente collocamento istituzionale di $15m, Barton stima un saldo di cassa pro forma di $20m.
L'azienda prevede di emettere le azioni SPP il 12 novembre 2025 con negoziazione dal 13 novembre 2025, lasciando un totale di 238.489.810 azioni ordinarie pienamente versate in circolazione. Barton ha detto che i lavori DFS per Central Gawler Mill Stage 1 e i sondaggi di aggiornamento JORC a Tunkillia Stage 2 stanno avanzando.
Barton Gold Holdings (ASX:BGD / OTCQB:BGDFF) confirmó los resultados finales de su Share Purchase Plan (SPP) el 10 de noviembre de 2025. El SPP se abrió el 23 de octubre de 2025 a $1.25 por acción, recaudando $660,000 mediante la emisión de 528,000 nuevas acciones (incluyendo $80,000 de los directores). Junto con una reciente colocación institucional de $15m, Barton estima un saldo de caja pro forma de $20m.
La compañía espera emitir las acciones del SPP el 12 de noviembre de 2025 con negociación a partir del 13 de noviembre de 2025, quedando un total de 238,489,810 acciones ordinarias totalmente pagadas en circulación. Barton dijo que el trabajo DFS para Central Gawler Mill Stage 1 y las perforaciones de actualización JORC en Tunkillia Stage 2 están avanzando.
Barton Gold Holdings (ASX:BGD / OTCQB:BGDFF)는 2025년 11월 10일에 주식매수계획(SPP)의 최종 결과를 확인했습니다. SPP는 2025년 10월 23일에 주당 $1.25로 개시되어 $660,000를 모았고, 528,000주의 신규주식을 발행했습니다(이 중 이사들의 기여 $80,000 포함). 최근의 기관 배정으로 $15m이 함께 합쳐져 Barton은 프로포마 현금 잔고를 $20m로 추정합니다.
회사는 2025년 11월 12일에 SPP 주식을 발행할 것으로 예상하며 2025년 11월 13일에 거래가 시작되어, 발행된 총 238,489,810주가 완전히 납입된 보통주를 남깁니다. Barton은 Central Gawler Mill Stage 1의 DFS 작업과 Tunkillia Stage 2의 JORC 업그레이드 시추가 진행 중이라고 말했습니다.
Barton Gold Holdings (ASX:BGD / OTCQB:BGDFF) a confirmé les résultats finaux de son Share Purchase Plan (SPP) le 10 novembre 2025. Le SPP a été ouvert le 23 octobre 2025 à $1,25 par action, levant $660,000 en émettant 528,000 nouvelles actions (dont $80,000 des administrateurs). Avec une placement institutionnel récent de $15m, Barton estime un solde de trésorerie pro forma de $20m.
La société prévoit d’émettre les actions SPP le 12 novembre 2025 avec une négociation à partir du 13 novembre 2025, laissant un total de 238,489,810 actions ordinaires entièrement libérées en circulation. Barton a déclaré que les travaux DFS pour Central Gawler Mill Stage 1 et le forage de mise à jour JORC à Tunkillia Stage 2 progressent.
Barton Gold Holdings (ASX:BGD / OTCQB:BGDFF) bestätigte die Endergebnisse seines Share Purchase Plan (SPP) am 10. November 2025. Der SPP wurde am 23. Oktober 2025 zu $1,25 pro Aktie eröffnet, wodurch $660,000 durch Ausgabe von 528.000 neuen Aktien eingenommen wurden (einschließlich $80,000 von Vorständen). Zusammen mit einer jüngsten institutionellen Platzierung von $15m schätzt Barton einen pro-forma Barmittelbestand von $20m.
Das Unternehmen erwartet, die SPP-Aktien am 12. November 2025 auszugeben, mit Handel ab dem 13. November 2025, was insgesamt 238.489.810 voll eingezahlte Stammaktien in Umlauf lässt. Barton sagte, DFS-Arbeiten für Central Gawler Mill Stage 1 und JORC-Aktualisierung-Bohrungen bei Tunkillia Stage 2 würden fortschreiten.
Barton Gold Holdings (ASX:BGD / OTCQB:BGDFF) أكّدت النتائج النهائية لخطة شراء الأسهم (SPP) في 10 نوفمبر 2025. افتُتح SPP في 23 أكتوبر 2025 عند $1.25 للسهم، مما جمع $660,000 بإصدار 528,000 سهماً جديداً (بما في ذلك $80,000 من المدراء). مع إصدار مؤسسي حديث لـ $15m، تقدر Barton رصيد نقدي شكلي قدره $20m.
تتوقع الشركة إصدار أسهم SPP في 12 نوفمبر 2025 مع بدء التداول اعتباراً من 13 نوفمبر 2025، ليبقى إجمالي 238,489,810 من الأسهم العادية المُدفوعة بالكامل قيد الإصدار. وقالت Barton إن أعمال DFS لمشروع Central Gawler Mill Stage 1 وحفر ترقية JORC في Tunkillia Stage 2 تتقدم.
- $20m estimated cash balance after Placement and SPP
- Completed institutional Placement of $15m
- Issued 528,000 new shares via SPP
- Updated share count to 238,489,810 fully paid shares
- Placement/SPP price 3.8% discount to last traded price before Placement
- SPP raised only $660,000, a modest funding tranche
Barton pivots toward commercialisation with
HIGHLIGHTS
$20m estimated cash balance after proceeds of recent$15m institutional placement and SPPShare Purchase Plan (SPP) opened 23 Oct 2025 at a price of
$1.25 / share (a premium to market during the SPP offer), with$660,000 applications accepted and 528,000 new shares to be issuedDefinitive Feasibility Study (DFS) underway for 'Stage 1' production at Central Gawler Mill, with JORC Mineral Resources upgrade drilling advancing rapidly at 'Stage 2' Tunkillia Gold Project
ADELAIDE, AU / ACCESS Newswire / November 10, 2025 / Barton Gold Holdings Limited (ASX:BGD)(OTCQB:BGDFF)(FRA:BGD3) ( Barton or the Company ) is pleased to confirm the final results of the Company's recently announced Share Purchase Plan ( SPP ).1
The SPP opened on 23 October 2025 and offered Eligible Subscribers the ability to acquire new Barton shares at the same price as the recent institutional placement led by Franklin Templeton ( Placement ). 1
The Placement and SPP were priced at
Discount of
3.8% to Barton's last traded price of$1.30 b efore the Placement announcement;Premium of
7.6% to Barton's 1 month (20 trading day) VWAP of$1.16 on the same day; andPremium of
9.2% to Barton's last traded price of$1.14 5 prior to settlement on 21 October 2025.
A total of
Barton expects to issue the SPP shares tomorrow, 12 November 2025, with the shares to start trading on 13 November 2025 in accordance with the timetable set out in Barton's 23 October 2025 announcement.
Following this issuance, Barton's capital structure will comprise 238,489,810 fully paid ordinary shares.
Commenting on the final SPP results, Barton Managing Director Alexander Scanlon said :
"We are honoured to receive support for the SPP from our existing investors, who join Franklin Templeton and other North American funds in supporting Barton at a premium to our market price as we enter an exciting new phase. We are humbled by this extraordinary vote of confidence and the universally positive feedback received.
"Together with our recent
Authorised by the Board of Directors of Barton Gold Holdings Limited.
For further information, please contact:
Alexander Scanlon | Jade Cook |
About Barton Gold
Barton Gold is an ASX, OTCQB and Frankfurt Stock Exchange listed Australian gold developer targeting future gold production of 150,000ozpa with 2.2Moz Au & 3.1Moz Ag JORC Mineral Resources (79.9Mt @ 0.87g/t Au), brownfield mines, and
Competent Persons Statement & Previously Reported Information
The information in this announcement that relates to the historic Exploration Results and Mineral Resources as listed in the table below is based on, and fairly represents, information and supporting documentation prepared by the Competent Person whose name appears in the same row, who is an employee of or independent consultant to the Company and is a Member or Fellow of the Australasian Institute of Mining and Metallurgy ( AusIMM ), Australian Institute of Geoscientists ( AIG ) or a Recognised Professional Organisation (RPO). Each person named in the table below has sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activity which he has undertaken to quality as a Competent Person as defined in the JORC Code 2012 ( JORC ).
Activity | Competent Person | Membership | Status |
Tarcoola Mineral Resource (Stockpiles) | Dr Andrew Fowler (Consultant) | AusIMM | Member |
Tarcoola Mineral Resource (Perseverance Mine) | Mr Ian Taylor (Consultant) | AusIMM | Fellow |
Tarcoola Exploration Results (until 15 Nov 2021) | Mr Colin Skidmore (Consultant) | AIG | Member |
Tarcoola Exploration Results (after 15 Nov 2021) | Mr Marc Twining (Employee) | AusIMM | Member |
Tunkillia Exploration Results (until 15 Nov 2021) | Mr Colin Skidmore (Consultant) | AIG | Member |
Tunkillia Exploration Results (after 15 Nov 2021) | Mr Marc Twining (Employee) | AusIMM | Member |
Tunkillia Mineral Resource | Mr Ian Taylor (Consultant) | AusIMM | Fellow |
Challenger Mineral Resource (above 215mRL) | Mr Ian Taylor (Consultant) | AusIMM | Fellow |
Challenger Mineral Resource (below 90mRL) | Mr Dale Sims | AusIMM / AIG | Fellow / Member |
Wudinna Mineral Resource (Clarke Deposit) | Ms Justine Tracey | AusIMM | Member |
Wudinna Mineral Resource (all other Deposits) | Mrs Christine Standing | AusIMM / AIG | Member / Member |
The information relating to historic Exploration Results and Mineral Resources in this announcement is extracted from the Company's Prospectus dated 14 May 2021 or as otherwise noted, available from the Company's website at www.bartongold.com.au or on the ASX website www.asx.com.au . The Company confirms that it is not aware of any new information or data that materially affects the Exploration Results and Mineral Resource information included in previous announcements and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates, and any production targets and forecast financial information derived from the production targets, continue to apply and have not materially changed. In accordance with ASX Listing Rule 5.19.2, the Company further confirms that the material assumptions underpinning any production targets and the forecast financial information derived therefrom continue to apply and have not materially changed. The Company confirms that the form and context in which the applicable Competent Persons' findings are presented have not been materially modified from the previous announcements.
Cautionary Statement Regarding Forward-Looking Information
This document may contain forward-looking statements. Forward-looking statements are often, but not always, identified by the use of words such as "seek", "anticipate", "believe", "plan", "expect", "target" and "intend" and statements than an event or result "may", "will", "should", "would", "could", or "might" occur or be achieved and other similar expressions. Forward-looking information is subject to business, legal and economic risks and uncertainties and other factors that could cause actual results to differ materially from those contained in forward-looking statements. Such factors include, among other things, risks relating to property interests, the global economic climate, commodity prices, sovereign and legal risks, and environmental risks. Forward-looking statements are based upon estimates and opinions at the date the statements are made. Barton undertakes no obligation to update these forward-looking statements for events or circumstances that occur subsequent to such dates or to update or keep current any of the information contained herein. Any estimates or projections as to events that may occur in the future (including projections of revenue, expense, net income and performance) are based upon the best judgment of Barton from information available as of the date of this document. There is no guarantee that any of these estimates or projections will be achieved. Actual results will vary from the projections and such variations may be material. Nothing contained herein is, or shall be relied upon as, a promise or representation as to the past or future. Any reliance placed by the reader on this document, or on any forward-looking statement contained in or referred to in this document will be solely at the readers own risk, and readers are cautioned not to place undue reliance on forward-looking statements due to the inherent uncertainty thereof.
1 Refer to ASX announcements dated 14 / 22 / 23 October 2025
* Refer to Barton Prospectus dated 14 May 2021 and ASX announcement dated 8 September 2025. Total Barton JORC (2012) Mineral Resources include 1,049koz Au (39.7Mt @ 0.82 g/t Au) in Indicated category and 1,186koz Au (40.2Mt @ 0.92 g/t Au) in Inferred category, and 3,070koz Ag (34.5Mt @ 2.80 g/t Ag) in Inferred category as a subset of Tunkillia gold JORC (2012) Mineral Resources.
SOURCE: Barton Gold Holdings Limited
View the original press release on ACCESS Newswire
