STOCK TITAN

GT Resources - Copper - Palladium - Platinum ("PGE") Project Updates

Rhea-AI Impact
(Low)
Rhea-AI Sentiment
(Neutral)
Tags
GT Resources provided updates on two copper-palladium-platinum projects. At the North Rock Project in Ontario, Canada, 2024 exploration identified geophysical conductors near historic high-grade footwall vein intercepts showing up to 14.6 g/t Palladium, 0.5 g/t Platinum, 0.3 g/t Gold, and 2.3% Copper. The LK Project in Finland, the company's most advanced asset, has significant mineral resources including Indicated Resources of 1.1M ounces of precious metals (0.89 g/t), 111M pounds of Copper (0.13%), and 92M pounds of Nickel (0.11%) in 38.2M tonnes. Inferred Resources include 1.1M ounces precious metals (0.68 g/t), 173M pounds Copper (0.16%), and 152M pounds Nickel (0.14%) in 49.7M tonnes. The company plans additional exploration at both sites, with North Rock focusing on high-grade massive sulphide targets and LK having expansion potential along the 17km Haukiaho Trend.
GT Resources ha fornito aggiornamenti su due progetti di rame, palladio e platino. Al progetto North Rock in Ontario, Canada, l'esplorazione del 2024 ha identificato conduttori geofisici vicino a intercetti storici di vene di footwall ad alta concentrazione, con valori fino a 14,6 g/t di Palladio, 0,5 g/t di Platino, 0,3 g/t di Oro e 2,3% di Rame. Il progetto LK in Finlandia, l'asset più avanzato dell'azienda, presenta risorse minerarie significative, tra cui risorse indicate di 1,1 milioni di once di metalli preziosi (0,89 g/t), 111 milioni di libbre di rame (0,13%) e 92 milioni di libbre di nichel (0,11%) in 38,2 milioni di tonnellate. Le risorse inferite comprendono 1,1 milioni di once di metalli preziosi (0,68 g/t), 173 milioni di libbre di rame (0,16%) e 152 milioni di libbre di nichel (0,14%) in 49,7 milioni di tonnellate. L'azienda prevede ulteriori esplorazioni in entrambi i siti, concentrandosi a North Rock su obiettivi di solfuri massivi ad alta concentrazione e al progetto LK sul potenziale di espansione lungo la tendenza Haukiaho di 17 km.
GT Resources proporcionó actualizaciones sobre dos proyectos de cobre, paladio y platino. En el Proyecto North Rock en Ontario, Canadá, la exploración de 2024 identificó conductores geofísicos cerca de interceptaciones históricas de vetas de footwall de alta ley, mostrando hasta 14,6 g/t de Paladio, 0,5 g/t de Platino, 0,3 g/t de Oro y 2,3% de Cobre. El Proyecto LK en Finlandia, el activo más avanzado de la compañía, cuenta con recursos minerales significativos, incluyendo recursos indicados de 1,1 millones de onzas de metales preciosos (0,89 g/t), 111 millones de libras de Cobre (0,13%) y 92 millones de libras de Níquel (0,11%) en 38,2 millones de toneladas. Los recursos inferidos incluyen 1,1 millones de onzas de metales preciosos (0,68 g/t), 173 millones de libras de Cobre (0,16%) y 152 millones de libras de Níquel (0,14%) en 49,7 millones de toneladas. La compañía planea exploraciones adicionales en ambos sitios, enfocándose en North Rock en objetivos de sulfuros masivos de alta ley y en LK en el potencial de expansión a lo largo de la tendencia Haukiaho de 17 km.
GT 리소스는 두 개의 구리-팔라듐-플래티넘 프로젝트에 대한 업데이트를 제공했습니다. 캐나다 온타리오의 노스 록 프로젝트에서는 2024년 탐사에서 역사적인 고등급 풋월 정맥 교차점 근처에서 지구물리학적 전도체가 확인되었으며, 팔라듐 14.6 g/t, 플래티넘 0.5 g/t, 금 0.3 g/t, 구리 2.3%의 값을 보였습니다. 핀란드의 LK 프로젝트는 회사의 가장 진전된 자산으로, 38.2백만 톤에서 귀금속 110만 온스(0.89 g/t), 구리 1억 1100만 파운드(0.13%), 니켈 9200만 파운드(0.11%)의 표시 자원이 있습니다. 추정 자원에는 49.7백만 톤에서 귀금속 110만 온스(0.68 g/t), 구리 1억 7300만 파운드(0.16%), 니켈 1억 5200만 파운드(0.14%)가 포함됩니다. 회사는 두 현장에서 추가 탐사를 계획하고 있으며, 노스 록에서는 고등급 대규모 황화물 목표에 집중하고, LK에서는 17km의 하우키아호 트렌드 확장 가능성을 모색하고 있습니다.
GT Resources a fourni des mises à jour sur deux projets de cuivre-palladium-platine. Au projet North Rock en Ontario, Canada, l'exploration de 2024 a identifié des conducteurs géophysiques près d'interceptions historiques de veines de footwall à haute teneur, avec des teneurs allant jusqu'à 14,6 g/t de palladium, 0,5 g/t de platine, 0,3 g/t d'or et 2,3 % de cuivre. Le projet LK en Finlande, l'actif le plus avancé de la société, possède d'importantes ressources minérales, incluant des ressources indiquées de 1,1 million d'onces de métaux précieux (0,89 g/t), 111 millions de livres de cuivre (0,13 %) et 92 millions de livres de nickel (0,11 %) dans 38,2 millions de tonnes. Les ressources inférées comprennent 1,1 million d'onces de métaux précieux (0,68 g/t), 173 millions de livres de cuivre (0,16 %) et 152 millions de livres de nickel (0,14 %) dans 49,7 millions de tonnes. La société prévoit des explorations supplémentaires sur les deux sites, en se concentrant à North Rock sur des cibles de sulfures massifs à haute teneur et à LK sur le potentiel d'expansion le long de la tendance Haukiaho de 17 km.
GT Resources gab Updates zu zwei Kupfer-Palladium-Platin-Projekten bekannt. Beim North Rock Projekt in Ontario, Kanada, identifizierte die Erkundung 2024 geophysikalische Leiter nahe historischen hochgradigen Fußwand-Adernabschnitten mit Werten von bis zu 14,6 g/t Palladium, 0,5 g/t Platin, 0,3 g/t Gold und 2,3 % Kupfer. Das LK-Projekt in Finnland, das fortschrittlichste Asset des Unternehmens, verfügt über bedeutende Mineralressourcen, darunter angezeigte Ressourcen von 1,1 Mio. Unzen Edelmetalle (0,89 g/t), 111 Mio. Pfund Kupfer (0,13 %) und 92 Mio. Pfund Nickel (0,11 %) in 38,2 Mio. Tonnen. Die vermuteten Ressourcen umfassen 1,1 Mio. Unzen Edelmetalle (0,68 g/t), 173 Mio. Pfund Kupfer (0,16 %) und 152 Mio. Pfund Nickel (0,14 %) in 49,7 Mio. Tonnen. Das Unternehmen plant weitere Erkundungen an beiden Standorten, wobei North Rock sich auf hochgradige massive Sulfidziele konzentriert und LK Expansionspotenzial entlang des 17 km langen Haukiaho-Trends aufweist.
Positive
  • LK Project has substantial mineral resources with 1.1M ounces of precious metals in Indicated category
  • Strategic location of LK Project in Finland provides competitive advantage with nearby copper and nickel smelters
  • North Rock Project shows high-grade mineralization with up to 14.6 g/t Palladium and 2.3% Copper
  • Both projects have significant expansion potential with North Rock's 13km contact zone and LK's 17km Haukiaho Trend
  • North Rock has excellent infrastructure with highway, railroad, and power lines access
Negative
  • Historical resource at North Rock's Beaver Pond Zone is not NI 43-101 compliant and requires verification
  • LK Project still requires further development to reach production stage
  • Additional exploration and drilling required at both projects to prove economic viability

Toronto, Ontario--(Newsfile Corp. - June 12, 2025) - GT Resources Inc. (TSXV: GT) (OTCQB: CGTRF) (FSE: 7N1) (the "Company" or "GT") is pleased to provide an update with regard to plans for the North Rock Project (Canada) and The Läntinen Koillismaa ("LK") Project (Finland) both Copper-Palladium-Platinum projects.

Highlights

North Rock Copper - Palladium - Platinum ("PGE") Project, Ontario, Canada

  • The 2024 exploration program identified off hole geophysical conductors adjacent to historic high-grade footwall vein intercepts which returned up to 14.6 g/t Palladium, 0.5 g/t Platinum, 0.3 g/t Gold and 2.3% Copper, and 0.6% Nickel over 0.6 meters in NR07-062 (see January 27, 2025 news release)

  • Upcoming exploration programs include additional Bore Hole Electro Magnetic ("BHEM") surveys of more historic holes, followed by detailed drill plans to target high-grade massive sulphide footwall style copper-palladium rich veins.

LK PGE - Copper - Nickel Project, Finland

LK is the Company's most advanced project with a substantial Palladium-Platinum-Copper rich open pit resource (see April 25, 2022 news release)

  • Indicated Resources:

    • 1.1 Million ounces Total Precious Metals (Palladium + Platinum + Gold) ("TMP") (0.89 g/t),

    • 111 Million pounds of Copper (0.13%),

    • 92 Million pounds of Nickel (0.11%), and

    • contained in 38.2 million tonnes.

  • Inferred Resources:

    • 1.1 Million ounces TMP (0.68 g/t),

    • 173 Million Pounds Copper (0.16%),

    • 152 Million Pounds Nickel (0.14%), and

    • contained in 49.7 million tonnes.

  • LK project remains wide open for expansion, notably along the 17 km long Haukiaho Trend (see July 20, 2022 news release)

Neil Pettigrew, Vice President Exploration, commented "With a significant mineral endowment, LK is the Company's most advanced project and is well position as a source of critical minerals for the European Union.

At North Rock high-grade copper-palladium-rich footwall style veins were not targeted by prior operators who focused on broader zones of disseminated copper-rich gabbro hosted mineralization. We believe there is substantial potential for high-grade footwall style mineralization, and this will be a core focus of future exploration programs."

North Rock Copper - Palladium - Platinum ("PGE") Project, Ontario Canada

The North Rock project is located in Northwest Ontario, boasts excellent infrastructure (bisected by a paved provincial highway and a railroad) and is crossed by power lines. The mineralization consists of copper-rich magmatic sulphide, along a 13-kilometer basal contact of mafic and ultramafic volcanic rocks (Figure 1). The mineralization occurs in two main styles; a more copper-rich "gabbro hosted" disseminated to locally net-textured sulphide within the basal heterolithic, varitextured gabbro, and as massive copper-palladium-rich sulphide "footwall vein" style within the footwall volcanic rocks.

Two very shallow zones have been discovered to date, the most significant of which is the Beaver Pond Zone (Figure 1), which hosts a Historic Resource Estimate1 of 1 million tons grading 1.2% Copper. The Beaver Pond Zone was discovered by Noranda in 1958 and subsequently explored from underground via a 90-meter deep shaft and one drift on the 70m level.

The Company undertook a BHEM survey in Q4 2024 on select historic holes located within the Beaver Pond zone. This was the first BHEM survey conducted on the property and was a "test case" to see if the North Rock mineralization was amenable to BHEM techniques. A prime focus of the survey was hole NR07-062, which at 780 meters is by far the deepest hole drilled on the project. This hole returned several conductors which have been modelled as Maxwell EM plates (Figure 2) with some plates corresponding to known footwall style copper-palladium-rich mineralization. The survey identified both "in hole" and "off hole" conductors potentially representing untested footwall style mineralization.

Future exploration plans include opening up historic drill trails to provide better access historic holes for more extensive BHEM surveys, including the East Zone (Figure 1) where abundant footwall vein style mineralization has been intersected. This initial phase would be followed by diamond drilling.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/6502/255294_9470ee0d446b88de_001.jpg

Figure 1. Historic zones of copper-platinum-palladium-rich mineralization along the favorable basal contact of the Grassy Portage Gabbroic complex.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6502/255294_9470ee0d446b88de_001full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/6502/255294_9470ee0d446b88de_002.jpg

Figure 2. Cross section, looking northeast through the Beaver Pond Zone showing historic drilling and newly modelled Maxwell EM plates, note hole NR07-062, the deepest hole on the property that hit footwall style Cu-PGE mineralization, but missed the gabbro hosted mineralization.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6502/255294_9470ee0d446b88de_002full.jpg

LK PGE - Copper - Nickel Project, Finland

The LK Project, located in central Finland represents the Company's most advanced project with a significant NI 43-101 compliant open pit resource (Table 1a & 1b) and is well position to supply the European Union with critical minerals, notably copper, palladium and platinum, of which Europe is heavy dependant on imports with only one producing mine (Boliden's Kevitsa mine in Finland). Boliden also operates both copper and nickel smelters in Finland, thereby providing LK a potential competitive advantage.

The 17-kilometer long Haukiaho trend represents the nearest term expansion potential (Figure 3). The Haukiaho Deposit currently occupies only 2 kilometers of this trend. Historic drilling along this trend, primarily by Outokumpu in the 1960's was only sampled for copper and nickel, partial resampling of historic drill core by the Company in 2022 (see July 20, 2022 news release) returned significant platinum and palladium grades.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/6502/255294_9470ee0d446b88de_003.jpg

Figure 3. Location Map of the LK Project, NI 43-101 Mineral Resources, and near-term expansion potential

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6502/255294_9470ee0d446b88de_003full.jpg

Mineral Resource Estimate:

Table 1a. 2022 LK MRE

MINERAL RESOURCE ESTIMATE - April 2022
Tonnes & Grade

Strip RatioTonnes (Mt)PdPtAuTPMCuNiCo
(g/t)(g/t)(g/t)(g/t)(%)(%)(g/t)
Indicated








Kaukua Area1.5038.20.610.220.070.890.130.1164.56
Inferred








Kaukua Area +Murtolampi1.4530.80.520.200.080.800.140.1486.07
Haukiaho0.5818.90.270.110.100.480.180.1454.30
Total Inf.1.2649.70.430.170.090.680.160.1473.98

 

Table 1b: 2022 LK MRE In-situ contained metal

MINERAL RESOURCE ESTIMATE - April 2022
Contained Metal

StripPdPtAuTPM CuNiCo
Ratio(M oz)(M oz)(M oz)(M oz)(M lbs)(M lbs)(M lbs)
Indicated
Kaukua Area1.500.740.260.081.09110.791.65.4
Inferred
Kaukua Area +Murtolampi1.450.520.200.070.7996.593.95.8
Haukiaho0.580.160.070.060.2976.457.52.3
Total Inf.1.260.680.260.141.08172.9151.58.1
Notes:
  1. CIM (2014) definitions were followed for Mineral Resources.
  2. The Mineral Resources have been reported above a preliminary open pit constraining surface using a Net Smelter Return (NSR) pit discard cut-off of US$12.5/t (which for comparison purposes equates to an approximately 0.65 g/t Palladium Equivalent in-situ cut-off, based on metal prices only).
  3. The NSR used for reporting is based on the following:
    1. Long term metal prices of US$ 1,700/oz Pd, US$ 1,100/oz Pt, US$ 1,800/oz Au, US$ 4.25/lb Cu, US$ 8.50/lb Ni and US$ 25/lb Co.
    2. Variable metallurgical recoveries for each metal were used at Kaukua and Murtolampi and fixed recoveries of 79.8% Pd, 80.1% Pt, 65% Au, 89% Cu, 64% Ni and 0% Co at Haukiaho.
    3. Commercial terms for a Cu and Ni concentrate based on indicative quotations from smelters.
  4. Total Precious Metals (TPM) equals palladium plus platinum plus gold
  5. Bulk densities range between 1.8 and 3.23 t/m3.
  6. Numbers may not add up due to rounding.
  7. Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues.
  8. The quantity and grade of reported inferred resources in this estimation are conceptual in nature and there has been insufficient exploration to define these inferred resources as an indicated or measured mineral resource and it is uncertain if further exploration will result in upgrading them to an indicated or measured mineral resource category.

 

The Mineral Resource Estimate was prepared by the Company under the supervision of Mr. Sean Horan, P.Geo., Technical Manager of Geology at SLR Consulting Ltd., based in Toronto, Ontario, Canada. Mr. Horan is an Independent Qualified Person as defined by NI 43-101. The Mineral Resource Estimate in the April 25, 2022 news release has been classified in accordance with CIM Definition Standards on Mineral Resources and Mineral Reserves (May 14, 2014).

1 - Disclaimer - Historical Resource Estimate - North Rock

Readers are cautioned that the Company has not attempted to verify historic mineral resource estimates and therefore readers should not place any reliance on any historical estimate. A qualified person has not done sufficient work to classify a historical estimate as a current mineral resource, additionally, a qualified person has not yet determined what work needs to be done to upgrade or verify a historical estimate as a current mineral resources or mineral reserves.

The Company is not treating any historical estimates as current mineral resources.

A Historical Resource Estimate on the Beaver Pond Zone of the North Rock project is quoted at 1 million tons grading 1.2% copper by Bergman (1973) (Ontario Mineral Deposit Inventory record MDI52C11NE00029). The parameters, methodology and categorise used are not known, and thus the reliability of the estimate cannot be determined, however, it is still considered relevant as underground development and diamond drilling in the 1960 & 1970s supported the estimate and provides a guide for future exploration.

Qualified Person

The technical information in this release has been reviewed and verified by Neil Pettigrew, M.Sc., P. Geo., Vice President of Exploration and a director of the Company and the Qualified Person as defined by National Instrument 43-101.

About GT Resources

GT Resources Inc. (TSXV: GT) is a mineral exploration company with a strategy to develop copper, nickel, platinum and palladium mining projects in Europe and North America. Our projects are located in Finland and Canada and are comprised of district scale opportunities that have attracted strategic investment from a major mining company.

Follow GT Resources on LinkedIn, Twitter, and at https://gtresourcesinc.com/.

ON BEHALF OF THE BOARD
"Derrick Weyrauch"
President & CEO, Director

For further information contact:
Derrick Weyrauch, President & CEO
Email:
info@GTResourcesinc.com

Neither the TSX Venture Exchange nor its Market Regulator (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This press release is not an offer or a solicitation of an offer of securities for sale in the United States of America. The common shares of GT Resources Inc. have not been and will not be registered under the U.S. Securities Act of 1933, as amended, and may not be offered or sold in the United States absent registration or an applicable exemption from registration.

Information set forth in this press release may contain forward-looking statements. Forward-looking statements are statements that relate to future, not past events. In this context, forward-looking statements often address a company's expected future business and financial performance, and often contain words such as "anticipate", "believe", "plan", "estimate", "expect", and "intend", statements that an action or event "may", "might", "could", "should", or "will" be taken or occur, or other similar expressions. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors include, among others, risks associated with project development; the need for additional financing; operational risks associated with mining and mineral processing; fluctuations in mineral and commodity prices; title matters; environmental liability claims and insurance; reliance on key personnel; the absence of dividends; competition; dilution; the volatility of our common share price and volume; and the impact of governmental entities. Forward-looking statements are made based on management's beliefs, estimates and opinions on the date that statements are made and the Company undertakes no obligation to update forward-looking statements if these beliefs, estimates and opinions or other circumstances should change. Investors are cautioned against attributing undue certainty to forward-looking statements.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/255294

FAQ

What are the current mineral resources at GT Resources' LK Project in Finland?

The LK Project has Indicated Resources of 1.1M ounces of precious metals (0.89 g/t), 111M pounds of Copper, and 92M pounds of Nickel in 38.2M tonnes, plus Inferred Resources of 1.1M ounces precious metals, 173M pounds Copper, and 152M pounds Nickel in 49.7M tonnes.

What were the high-grade intercepts discovered at CGTRF's North Rock Project?

The North Rock Project's historic high-grade footwall vein intercepts showed up to 14.6 g/t Palladium, 0.5 g/t Platinum, 0.3 g/t Gold, 2.3% Copper, and 0.6% Nickel over 0.6 meters in hole NR07-062.

What is the expansion potential of GT Resources' LK Project?

The LK Project has significant expansion potential along the 17-kilometer long Haukiaho Trend, of which the current Haukiaho Deposit only occupies 2 kilometers.

What infrastructure does GT Resources' North Rock Project have?

The North Rock Project has excellent infrastructure, being bisected by a paved provincial highway and railroad, and crossed by power lines.

What is the historical resource estimate for CGTRF's Beaver Pond Zone?

The Beaver Pond Zone has a historical resource estimate of 1 million tons grading 1.2% Copper, though this estimate is not NI 43-101 compliant and requires verification.
GT Rsrcs

OTC:CGTRF

CGTRF Rankings

CGTRF Latest News

CGTRF Stock Data

7.75M
285.60M
28.28%
Other Industrial Metals & Mining
Basic Materials
Link
Canada
Toronto