CENTURY LITHIUM FILES TECHNICAL REPORT ON THE FEASIBILITY STUDY FOR THE ANGEL ISLAND LITHIUM PROJECT, NEVADA
Rhea-AI Summary
Century Lithium (OTCQX: CYDVF) filed an updated NI 43-101 Feasibility Study for the 100%‑owned Angel Island (Clayton Valley) lithium project, effective Jan 3, 2026.
Key metrics: after‑tax NPV (8%) $4.01B, after‑tax IRR 27.4%, life‑of‑mine average ~26,500 tpa LCE, >60‑year mine life, Phase 1 capex $997M and Phase 2 capex $660M. Proven & Probable reserves: 1.759M t LCE.
Positive
- After‑tax NPV (8%) of $4.01 billion
- After‑tax IRR of 27.4%
- Life‑of‑mine average production ~26,500 tpa LCE
- Proven & Probable reserves of 1.759 million t LCE
- Phase 1 capital cost estimated at $997 million
Negative
- Total expansion capital of $660 million (Phase 2) increasing project capex
- Combined initial and expansion capex ~$1.657 billion
- Average operating cost equivalent to $4,389 per tonne LCE
- Measured & Indicated resource (5.852M t LCE) exceeds reserves, indicating conversion needed
News Market Reaction – CYDVF
On the day this news was published, CYDVF declined 11.17%, reflecting a significant negative market reaction.
Data tracked by StockTitan Argus on the day of publication.
All currency amounts in this news release are presented in US dollars.
The Feasibility Study incorporates the results of continued metallurgical testing, engineering optimization, refinement of the mine plan, and updated capital and operating cost estimates for Angel Island. Using a base case price of
Feasibility Study Highlights
- After-tax NPV (
8% discount rate) of based on price assumptions of$4.01 billion /t for lithium carbonate and$24,000 /dry metric tonne for sodium hydroxide$750 - After-tax IRR of
27.4% - Integrated patent-pending processing flowsheet, incorporating hydrochloric acid leaching, Direct Lithium Extraction ("DLE"), chlor-alkali processing, and on-site production of battery-grade lithium carbonate, validated through four years of pilot plant operations in
Nevada - Large, long-life US-based lithium development project, with Proven and Probable Reserves supporting a mine life exceeding 60 years
- Economic analysis based on a 40-year production schedule, with a life-of-mine average production of approximately 26,500 tonnes per annum ("tpa") of battery-grade lithium carbonate
- Phase 1 throughput of 7,500 tonnes per day ("tpd"), expanding to 15,000 tpd in Year 5 (Phase 2)
Capital and Operating Costs
- Phase 1 estimated capital cost of
$997 million - Phase 2 estimated expansion capital of
$660 million - Average estimated operating cost of
/t of mill feed, equivalent to$22.45 per tonne of lithium carbonate$4,389 - Project revenues from surplus sodium hydroxide equivalent to
/t of lithium carbonate produced. When treated as a co-product credit, this would result in a net operating cost below zero$5,393
Mineral Resource and Reserve
- Measured and Indicated Mineral Resources of 1.138 billion t at 966 parts per million ("ppm") lithium, containing 5.852 million t lithium carbonate equivalent ("LCE")
- Proven and Probable Mineral Reserves of 287.65 million t at 1,149 ppm lithium, containing 1.759 million t LCE
Qualified Person
The technical information contained in this news release was reviewed and approved by Richard W. Jolk, P.E., an independent Qualified Person as defined under National Instrument 43-101.
ABOUT CENTURY LITHIUM CORP.
Century Lithium Corp. is an advanced-stage lithium development company focused on its
The Company has developed a patent-pending process that incorporates hydrochloric acid leaching combined with direct lithium extraction to produce battery-grade lithium carbonate. As part of the integrated chlor-alkali process, Angel Island is designed to produce sodium hydroxide as a co-product, with planned surplus sales expected to lower operating costs, reduce reliance on externally sourced reagents, and minimize environmental impacts.
Century Lithium is currently advancing Angel Island through the permitting process.
Century Lithium trades on the TSX Venture Exchange under the symbol "LCE" the OTCQX under the symbol "CYDVF", and on the Frankfurt Stock Exchange under the symbol "C1Z".
To learn more, please visit centurylithium.com.
ON BEHALF OF CENTURY LITHIUM CORP.
WILLIAM WILLOUGHBY, PhD., PE
President & Chief Executive Officer
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.
Cautionary Note Regarding Forward-Looking Statements
This release contains certain forward-looking statements within the meaning of applicable Canadian securities legislation. In certain cases, forward-looking statements can be identified by the use of words such as "plans", "expects" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" and similar expressions suggesting future outcomes or statements regarding an outlook.
Forward-looking statements relate to any matters that are not historical facts and statements of our beliefs, intentions and expectations about developments, results and events which will or may occur in the future, without limitation, statements with respect to the potential development and value of the Project and benefits associated therewith, statements with respect to the expected project economics for the Project, such as estimates of life of mine, lithium prices, production and recoveries, capital and operating costs, IRR, NPV and cash flows, any projections outlined in the Feasibility Study in respect of the Project, the permitting status of the Project and the Company's future development plans.
These and other forward-looking statements and information are subject to various known and unknown risks and uncertainties, many of which are beyond the ability of the Company to control or predict, that may cause their actual results, performance or achievements to be materially different from those expressed or implied thereby, and are developed based on assumptions about such risks, uncertainties and other factors set out herein. These risks include those described under the heading "Risk Factors" in the Company's most recent annual information form and its other public filings, copies of which can be found under the Company's profile at www.sedarplus.com. The Company expressly disclaims any obligation to update-forward-looking information except as required by applicable law. No forward-looking statement can be guaranteed, and actual future results may vary materially. Accordingly, readers are advised not to place reliance on forward-looking statements or information. Furthermore, Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
View original content to download multimedia:https://www.prnewswire.com/news-releases/century-lithium-files-technical-report-on-the-feasibility-study-for-the-angel-island-lithium-project-nevada-302708431.html
SOURCE Century Lithium Corp.
FAQ
What are the key financial results in Century Lithium's Mar 9, 2026 feasibility study for CYDVF?
How much lithium carbonate will the Angel Island project produce annually per the CYDVF feasibility study?
What are the capital cost estimates for Angel Island in Century Lithium's CYDVF filing?
What reserves and resources does Century Lithium report for Angel Island in the Jan 3, 2026 study?
How does the feasibility study address operating costs and by‑product credits for CYDVF's Angel Island?