STOCK TITAN

Notifications

Limited Time Offer! Get Platinum at the Gold price until January 31, 2026!

Sign up now and unlock all premium features at an incredible discount.

Read more on the Pricing page

Delta Resources Completes Regional Till Survey, Commences Environmental Baseline Program and Advances Phase II Drilling at Delta-1 in Thunder Bay, Ontario

Rhea-AI Impact
(No impact)
Rhea-AI Sentiment
(Positive)

Delta Resources (OTC: DTARF) reports progress at the Delta-1 gold property, 50 km west of Thunder Bay, Ontario. Field crews completed the third phase of a regional till survey to refine targets including the I-Zone, and historical non-NI 43-101 intercepts cited include up to 9.9 g/t Au from a 2008 mini bulk sample.

The company has launched a 2025-2026 environmental baseline program (RPAS imagery, hydrology stations, water quality, Species at Risk surveys, benthic and archaeological assessment) to support future permitting. Phase II drilling began Sept 17, 2025: a minimum of 13 holes totaling >3,100 m; nine holes completed and the tenth in progress. Assays will follow as available.

Loading...
Loading translation...

Positive

  • Phase II drilling: minimum 13 holes totaling >3,100 metres
  • Nine drill holes completed to date with tenth in progress
  • Third-phase regional till survey completed across Delta-1 western area
  • Environment baseline program initiated for 2025-2026 permitting data

Negative

  • No assay results released yet from Phase II drilling
  • Historical high-grade intercepts cited are non-NI 43-101 and unverified
  • No maiden mineral resource or quantified reserve disclosed

Toronto, Ontario--(Newsfile Corp. - October 8, 2025) - Delta Resources Limited (TSXV: DLTA) (OTC Pink: DTARF) (FSE: 6GO1) ("Delta" or the "Company") is pleased to report on the progress of its ongoing exploration activities and to announce the launch of a baseline environmental program at the Delta-1 Gold Property, located 50 kilometres west of Thunder Bay, Ontario.

Completion of Regional Till Survey

Field crews from IOS Géosciences Inc. ("IOS") have completed the third phase of Delta's 2024-2025 regional till sampling program. This work systematically expanded geochemical coverage across the western portion of the Delta-1 property, including the I-Zone sector, located approximately 18 kilometres southwest of the Eureka Gold Deposit. The I-Zone sector hosts several high-grade gold showings, including historical (non-NI 43-101 compliant) drill intercepts of 4.32 g/t Au over 41.0 metres, 4.53 g/t Au over 14.4 metres, and 4.36 g/t Au over 20.4 metres (Landore Resources, 1995-1997), as well as a 1,000-kg mini bulk sample (Mengold Resources 2008) that returned an average grade of 9.9 g/t Au. Results from the till survey will be used to guide follow-up exploration and to define new targets for potential drilling in 2026.

Initiation of Environmental Baseline Program

Delta has initiated its environmental baseline program, led by Thunder Bay-based CSL Environmental & Geotechnical Ltd.

The initial 2025-2026 baseline program will include:

  • Remotely Piloted Aerial Systems (RPAS) imagery of key watercourses.
  • Installation of hydrology stations and subsequent flow monitoring.
  • Surface water quality monitoring.
  • Species at Risk surveys and possible initiation of other terrestrial and aquatic baseline studies (vegetation, wetlands, wildlife, fisheries, benthic invertebrates).
  • A Stage 1 archaeological assessment.

This work represents an important step in advancing Delta-1 with an eye to future economic assessments and permitting. These initial studies will run through 2025-2026 and will be expanded upon in subsequent years as the project progresses, to establish a comprehensive environmental dataset.

Phase II Drilling Program Advancing

Delta is currently executing Phase II of its 2025 drilling program, which commenced on September 17, 2025. The program will include a minimum of 13 drill holes totaling over 3,100 metres, designed to expand the Eureka Gold Deposit and test satellite targets. Current targets include:

  • Shabaqua Zone: Located 1.3 kilometres west of Eureka, following up on high-grade surface sampling by both Metals Creek and Delta.
  • Eureka-South Extension: Immediately south of the Eureka Deposit, targeting shallow mineralization along strike.
  • Eureka-West Extension: Testing continuity and expansion of the deposit toward the west.

The program is advancing rapidly with excellent production rates. To date, nine (9) drill holes have been completed, with a tenth in progress. Assay results will be released as they become available.

Ron Kopas, Interim Chief Executive Officer of Delta, commented:

"With drilling well under way at Delta-1, the completion of the third phase of our regional till survey, and the initiation of baseline environmental studies, the Company is making significant progress on multiple fronts. We are confident these efforts will not only expand the resource potential but also lay the groundwork for responsible project development and enhance the value of our project as we advance Delta-1 toward the next stage of growth.

"With a 297 Km2 land package at Delta-1, there remain many highly prospective targets we have yet to properly explore, which is very exciting, especially with the benefit of having a property in such a prime, easily accessible location. We truly have the potential to be one of the lowest cost mining camps in the country."

Qualified Person

Daniel Boudreau, P.Geo., Exploration Manager at Delta Resources Limited, is the Qualified Person as defined by National Instrument 43-101 and has reviewed and approved the technical information contained in this press release.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

About Delta Resources Limited

Delta Resources is a Canadian mineral exploration and project development company focused on its Delta-1 project in Ontario, where it has discovered a large, near-surface gold deposit located 50 kilometres west of Thunder Bay, directly adjacent to the Trans-Canada Highway. The Eureka Gold Deposit extends 2.5 km in strike length, from surface to over 300 metres in depth. Highlights include drill intercepts such as 5.92 g/t Au over 31 metres (including 14.8 g/t Au over 11.9 metres), and 1.79 g/t Au over 128.5 metres. Mineralization has been observed up to 600 metres vertical depth and remains open in all directions. The property covers 297 square kilometres where Delta has identified multiple corridors of intense alteration and deformation, on strike with and to the south of the Eureka gold zone and that have yet to be thoroughly explored.

We seek safe harbour. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. The TSX Venture Exchange has not approved nor disapproved of the information contained herein.

For Further Information:
Contact Delta Resources Limited

Frank Candido, Chairman
Tel: 514-969-5530
fcandido@deltaresources.ca
or
Ron Kopas, CEO (Interim)
rkopas@deltaresources.ca

Cautionary Note Regarding Forward-Looking Information

Some statements contained in this news release are "forward-looking information" within the meaning of Canadian securities laws. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", "believes" or variations of such words and phrases (including negative or grammatical variations) or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connotation thereof. Investors are cautioned that forward-looking information is inherently uncertain and involves risks, assumptions and uncertainties that could cause actual facts to differ materially. There can be no assurance that future developments affecting the Company will be those anticipated by management. The forward-looking information contained in this press release constitutes management's current estimates, as of the date of this press release, with respect to the matters covered thereby. We expect that these estimates will change as new information is received. While we may elect to update these estimates at any time, we do not undertake to update any estimate at any particular time or in response to any event.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/269588

FAQ

What drilling program did Delta Resources (DTARF) start at Delta-1 on September 17, 2025?

Delta began a Phase II drilling program targeting Eureka extensions: at least 13 holes for >3,100 metres, with nine holes completed to date.

What did the October 8, 2025 update say about environmental studies at Delta-1 (DTARF)?

Delta launched a 2025-2026 environmental baseline program including RPAS imagery, hydrology stations, surface water quality, Species at Risk surveys and a Stage 1 archaeological assessment.

How will the regional till survey affect exploration at Delta-1 (DTARF)?

The completed third-phase till survey expands geochemical coverage and will be used to guide follow-up exploration and 2026 drilling target definition.

Are there any assay results from Delta Resources (DTARF) Phase II drilling yet?

No assay results have been released; the company said assays will be published as they become available.

What historical gold results are referenced for the Delta-1 I-Zone near DTARF?

Historical, non-NI 43-101 results cited include drill intercepts and a 1,000-kg mini bulk sample averaging 9.9 g/t Au from 2008.
Delta Res

OTC:DTARF

DTARF Rankings

DTARF Latest News

DTARF Stock Data

17.14M
109.49M
18.64%
4.4%
Gold
Basic Materials
Link
Canada
Kingston