First Mining Reports Continued Drilling Success at its Miroir Discovery with 2.01 g/t Au over 29.8 m
First Mining (OTCQX: FFMGF) reported additional 2025 drill results from the Miroir discovery at the Duparquet Project (Nov 10, 2025). The Company completed 16,577 m across the 2025 program and has drilled 22 holes at Miroir to date, with assays disclosed from 14 holes.
Key intersections include DUP25-078: 2.01 g/t Au over 29.8 m (incl. 15.70 g/t Au over 0.75 m and 18.20 g/t Au over 1.0 m), DUP25-077: 3.20 g/t Au over 15.75 m (incl. 22.50 g/t Au over 0.7 m), and DUP25-079: 1.76 g/t Au over 16.25 m. The Miroir zone is traced ~100 m along strike and ~100 m depth and remains open for expansion.
- DUP25-078: 2.01 g/t Au over 29.8 m
- DUP25-077: 3.20 g/t Au over 15.75 m
- Shallow continuity traced to 100 m depth and 100 m strike
- 2025 program: 16,577 m drilled across the Duparquet Project
- Only ~550 m of the ~4,450 m drilled at Miroir have been reported
- Assay results pending for 8 holes at Miroir (results not yet disclosed)
- DUP25-077 returns 3.20 g/t Au over 15.75 m, including 5.21 g/t Au over 8.65 m and 22.50 g/t Au over 0.7 m
- DUP25-078 returns 2.01 g/t Au over 29.80 m, including 15.70 g/t Au over 0.75 m and 18.20 g/t Au over 1.0 m
"The Miroir target has now been extended up dip in an attractive shallow mineralization setting while demonstrating a strong continuity, a key characteristic of the Duparquet Project," stated Dan Wilton, CEO of First Mining. "The continued growth and success in our exploration execution supports an increasing level of optionality within development scenarios which we are reviewing as we advance the project."
Drilling at the Miroir target, located 225 m north of the
The latest reported assays represent approximately 550 m of drilling from a total of ~4,450 metres across 22 drill holes at the Miroir target. These holes were focused on advancing the understanding of mineralization controls at Miroir, while testing the targets near-surface, up-dip potential. Assay highlights are provided in Table 1, with the full list of assay results presented in Table 2 and drill collar details in Table 3.
The location of additional drill testing at the Miroir target where assays are still pending is shown in Figure 1. As results are returned and reviewed, First Mining will continue to interpret and evolve the geological understanding of the area for further drill advancement.
Table 1: Latest Significant 2025 Drill Intercepts from the Miroir Target
|
Hole ID |
|
From (m) |
To (m) |
Length (m) |
Grade (Au g/t) |
|
DUP25-077 |
|
48.2 |
63.95 |
15.75 |
3.20 |
|
DUP25-077 |
inc. |
54.0 |
62.65 |
8.65 |
5.21 |
|
DUP25-077 |
and inc. |
56.5 |
57.2 |
0.7 |
22.50 |
|
DUP25-077 |
|
124.7 |
136.5 |
11.8 |
0.72 |
|
DUP25-078 |
|
18.0 |
47.8 |
29.8 |
2.01 |
|
DUP25-078 |
inc. |
21.55 |
22.3 |
0.75 |
15.70 |
|
DUP25-078 |
inc. |
46.8 |
47.8 |
1.0 |
18.20 |
|
DUP25-079 |
|
48.0 |
64.25 |
16.25 |
1.76 |
|
DUP25-079 |
inc. |
58.05 |
64.25 |
6.2 |
3.02 |
|
DUP25-079 |
|
80.0 |
88.0 |
8.00 |
0.71 |
|
DUP25-079 |
|
96.7 |
104.0 |
7.3 |
0.74 |
Drilling activities at the Duparquet Project concluded for the year in October, with a total of 16,577 m drilled during the 2025 program. The 2025 field mapping campaign was also completed with a focused regional mapping consisting of 274 outcrops mapped and 308 grab samples including QA/QC. Pending assay results are being returned and the Company will provide further updates upon receipt and interpretation. The Company is focusing on reviewing and integrating all 2025 drill results into their 3D geological and exploration target models, and in conjunction with this, the 2026 exploration programs for the Project are in development and review.
Additional Details on the Miroir Target
The most recent 2025 drilling at the Miroir target focused on further delineating the extent of near-surface mineralization discovered in 2024, with drill hole DUP24-048 returning 3.12 g/t Au over 19.35 m (see news release dated January 20, 2025). Earlier drilling this year, including drill hole DUP25-052, returned a further intercept along strike of 2.77 g/t Au over 11.1 m, including 4.36 g/t Au over 6.5 m (see news release dated May 28, 2025), demonstrating encouraging grades and widths within this shallow target. Strong continuity of the near surface opportunity was further reinforced with DUP25-064 returning 3.23 g/t Au over 25.9 m, including 11.20 g/t Au over 2.0 m, and including 10.16 g/t Au over 1.4 (see news release dated September 24, 2025). The most recent drilling continues to confirm and extend the Miroir target, tracing mineralization towards the surface and exploring the strike extent of the Miroir target area.
The interpreted geophysical fold target has demonstrated continuity, reinforcing the shallow, high-potential nature of the target and its ongoing growth potential. Notable results from the most recent drilling include drill hole DUP25-077 which returned 3.20 g/t Au over 15.75 m, including 5.21g/t Au over 8.65 m, and including 22.5 g/t Au over 0.7 m, as well as 0.72 g/t Au over 11.8 m. Drill hole DUP25-078 returned 2.01 g/t Au over 29.8 m, including15.7 g/t Au over 0.75 m, including 18.2 g/t Au over 1.0 m, while DUP25-079 returned 1.76 g/t Au over 16.25 m, including 3.02 g/t Au over 6.2 m and 0.71 g/t Au over 8.00 m as well as 0.74 g/t Au over 7.3 m. These results continue to demonstrate the multiple, high-quality gold zones within the Miroir target and reinforce its potential for further growth.
Mineralization at the target area is typically associated with syenite-basalt contacts. Mineralization in the most recent drill holes is hosted within brecciated silica-altered syenite and basalt, with up to 2
Table 2: Latest Assay Results from 2025 Drill Program for the Miroir Target
|
Hole ID |
|
From (m) |
To (m) |
Length (m) |
Grade ( Au g/t) |
|
DUP25-069 |
|
69.0 |
71.0 |
2.0 |
0.66 |
|
DUP25-069 |
|
107.25 |
108.8 |
1.55 |
2.94 |
|
DUP25-077 |
|
8.0 |
9.0 |
1.0 |
2.86 |
|
DUP25-077 |
|
12.0 |
13.0 |
1.0 |
0.96 |
|
DUP25-077 |
|
42.95 |
44.65 |
1.7 |
0.74 |
|
DUP25-077 |
|
48.2 |
63.95 |
15.75 |
3.20 |
|
DUP25-077 |
inc. |
54.0 |
62.65 |
8.65 |
5.21 |
|
DUP25-077 |
and inc. |
56.5 |
57.2 |
0.7 |
22.50 |
|
DUP25-077 |
|
91.1 |
92.9 |
1.8 |
0.60 |
|
DUP25-077 |
|
101.9 |
102.75 |
0.85 |
0.52 |
|
DUP25-077 |
|
108.0 |
109.45 |
1.45 |
1.91 |
|
DUP25-077 |
|
117.15 |
118.1 |
0.95 |
0.46 |
|
DUP25-077 |
|
124.7 |
136.5 |
11.8 |
0.72 |
|
DUP25-077 |
|
154.0 |
155.0 |
1.0 |
0.48 |
|
DUP25-077 |
|
196.0 |
198.0 |
2.0 |
0.80 |
|
DUP25-077 |
|
208.0 |
214.0 |
6.0 |
assays pending |
|
DUP25-078 |
|
10.0 |
13.0 |
3.0 |
0.48 |
|
DUP25-078 |
|
18.0 |
47.8 |
29.80 |
2.01 |
|
DUP25-078 |
inc. |
21.55 |
22.3 |
0.75 |
15.70 |
|
DUP25-078 |
inc. |
46.80 |
47.8 |
1.0 |
18.20 |
|
DUP25-078 |
|
54.0 |
54.7 |
0.7 |
0.82 |
|
DUP25-078 |
|
111.1 |
111.7 |
0.6 |
1.37 |
|
DUP25-078 |
|
132.7 |
134.1 |
1.4 |
0.57 |
|
DUP25-079 |
|
7.7 |
8.45 |
0.75 |
1.43 |
|
DUP25-079 |
|
43.0 |
45.0 |
2.0 |
0.54 |
|
DUP25-079 |
|
48.0 |
64.25 |
16.25 |
1.76 |
|
DUP25-079 |
inc. |
58.05 |
64.25 |
6.2 |
3.02 |
|
DUP25-079 |
|
80.0 |
88.0 |
8.0 |
0.71 |
|
DUP25-079 |
|
96.7 |
104.0 |
7.3 |
0.74 |
|
*Reported intervals are drilled core lengths (true widths are estimated at 75 |
Table 3: Latest 2025 Drill Hole Locations, Miroir Target
|
Hole ID |
Azimuth (°) |
Dip (°) |
Length (m) |
Easting |
Northing |
|
DUP25-069 |
0 |
-46 |
114 |
633371 |
5374001 |
|
DUP25-077 |
335 |
-46 |
252 |
633593 |
5374064 |
|
DUP25-078 |
336 |
-46 |
150 |
633567 |
5374071 |
|
DUP25-079 |
335 |
-45 |
150 |
633610 |
5374080 |
|
Note: Collar coordinates in UTM NAD 83 z17 |
About the Duparquet Gold Project
The Duparquet Project is geologically situated in the southern part of the Abitibi Greenstone Belt and is geographically located approximately 50 km north of the city of
The Duparquet Project totals approximately 5,800 hectares focused on an area of 19 km of strike length along the prolific Destor-Porcupine Fault Zone, along with numerous mineralized splays and influential secondary lineaments. The Duparquet Project includes the past-producing Beattie, Donchester and Duquesne mines as well as the
|
1
Further details on the Duparquet PEA can be found in the technical report entitled "NI 43-101 Technical Report: Preliminary Economic Assessment, Duparquet Gold Project, |
Analytical Laboratory and QA/QC Procedures
All sampling completed by First Mining within its exploration programs is subject to a Company standard of internal quality control and quality assurance (QA/QC) programs which include the insertion of certified reference materials, blank materials and a level of duplicate analysis. Core samples from the 2025 drilling program at
Qualified Person
James Maxwell, P.Geo., VP, Exploration and Project Operations for First Mining, is a "Qualified Person" for the purposes of NI 43-101 Standards of Disclosure for Mineral Projects and has reviewed and approved the scientific and technical disclosure contained in this news release.
About First Mining Gold Corp.
First Mining is a gold developer advancing two of the largest gold projects in
First Mining was established in 2015 by Mr. Keith Neumeyer, founding President and CEO of First Majestic Silver Corp.
ON BEHALF OF FIRST MINING GOLD CORP.
Daniel W. Wilton
Chief Executive Officer and Director
Cautionary Note Regarding Forward-Looking Statements
This news release includes certain "forward-looking information" and "forward-looking statements" (collectively "forward-looking statements") within the meaning of applicable Canadian and
Forward-looking statements in this news release relate to future events or future performance and reflect current estimates, predictions, expectations or beliefs regarding future events. All forward-looking statements are based on First Mining's or its consultants' current beliefs as well as various assumptions made by them and information currently available to them. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements reflect the beliefs, opinions and projections on the date the statements are made and are based upon a number of assumptions and estimates that, while considered reasonable by the respective parties, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Such factors include, without limitation the Company's business, operations and financial condition potentially being materially adversely affected by the outbreak of epidemics, pandemics or other health crises, and by reactions by government and private actors to such outbreaks; risks to employee health and safety as a result of the outbreak of epidemics, pandemics or other health crises, that may result in a slowdown or temporary suspension of operations at some or all of the Company's mineral properties as well as its head office; fluctuations in the spot and forward price of gold, silver, base metals or certain other commodities; fluctuations in the currency markets (such as the Canadian dollar versus the
First Mining cautions that the foregoing list of factors that may affect future results is not exhaustive. When relying on our forward-looking statements to make decisions with respect to First Mining, investors and others should carefully consider the foregoing factors and other uncertainties and potential events. First Mining does not undertake to update any forward-looking statement, whether written or oral, that may be made from time to time by the Company or on our behalf, except as required by law.
Cautionary Note to United States Investors
The Company is a "foreign private issuer" as defined in Rule 3b-4 under the United States Securities Exchange Act of 1934, as amended, and is eligible to rely upon the
Technical disclosure contained in this news release has not been prepared in accordance with the requirements of
NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning the issuer's material mineral projects.
View original content to download multimedia:https://www.prnewswire.com/news-releases/first-mining-reports-continued-drilling-success-at-its-miroir-discovery-with-2-01-gt-au-over-29-8-m-302609382.html
SOURCE First Mining Gold Corp.