STOCK TITAN

Axcap Ventures Identifies High-Grade Zone Below Pit Shell at Converse; Drills 10.85 Meters Grading 5.45 g/t Gold

Rhea-AI Impact
(Moderate)
Rhea-AI Sentiment
(Negative)
Tags
Axcap Ventures has announced significant drilling results from its first hole (CV25-001C) at the Converse Project in Nevada's Battle Mountain-Eureka Trend. The drilling confirmed near-surface gold mineralization and discovered a new high-grade zone at depth, intersecting 10.85 meters grading 5.45 g/t gold from 666.4 meters depth. The project currently hosts a large open pit resource of 5.5 Moz at 0.53 g/t in measured and indicated categories, plus 420koz at 0.53 g/t inferred. Key intersections include 26.18 meters at 2.52 g/t gold from 654 meters and 21.21 meters at 0.31 g/t Au with silver and copper credits from 208.8m. The discovery is part of a 5,500-meter drill program aimed at confirming current resources, reducing waste, and testing for mineralization expansion opportunities.
Axcap Ventures ha annunciato risultati significativi dalla perforazione del primo foro (CV25-001C) nel Progetto Converse, situato nella Battle Mountain-Eureka Trend in Nevada. La perforazione ha confermato la mineralizzazione aurifera vicino alla superficie e ha scoperto una nuova zona ad alta concentrazione in profondità, intercettando 10,85 metri con una gradazione di 5,45 g/t di oro a una profondità di 666,4 metri. Il progetto ospita attualmente una grande risorsa a cielo aperto di 5,5 milioni di once con una gradazione di 0,53 g/t nelle categorie misurata e indicata, oltre a 420.000 once a 0,53 g/t nella categoria inferita. Tra le intersezioni chiave si segnalano 26,18 metri a 2,52 g/t di oro da 654 metri e 21,21 metri a 0,31 g/t di oro con crediti di argento e rame da 208,8 metri. La scoperta fa parte di un programma di perforazione da 5.500 metri volto a confermare le risorse attuali, ridurre gli scarti e testare opportunità di espansione della mineralizzazione.
Axcap Ventures ha anunciado resultados significativos de perforación en su primer pozo (CV25-001C) en el Proyecto Converse, ubicado en la tendencia Battle Mountain-Eureka de Nevada. La perforación confirmó la mineralización de oro cerca de la superficie y descubrió una nueva zona de alta ley a profundidad, interceptando 10,85 metros con una ley de 5,45 g/t de oro desde 666,4 metros de profundidad. El proyecto actualmente cuenta con un recurso de tajo abierto de 5,5 millones de onzas a 0,53 g/t en categorías medidas e indicadas, además de 420.000 onzas a 0,53 g/t inferidas. Las intersecciones clave incluyen 26,18 metros a 2,52 g/t de oro desde 654 metros y 21,21 metros a 0,31 g/t de oro con créditos de plata y cobre desde 208,8 metros. El descubrimiento forma parte de un programa de perforación de 5.500 metros destinado a confirmar los recursos actuales, reducir los residuos y probar oportunidades de expansión de la mineralización.
Axcap Ventures는 네바다 주 Battle Mountain-Eureka 트렌드에 위치한 Converse 프로젝트의 첫 번째 시추공(CV25-001C)에서 중요한 시추 결과를 발표했습니다. 시추 결과는 근표면 금 광화를 확인했으며, 깊은 곳에서 새로운 고품위 구간을 발견하여 666.4미터 깊이에서 10.85미터 구간에 5.45 g/t 금을 교차했습니다. 이 프로젝트는 현재 측정 및 지시 자원 범주에서 0.53 g/t 금 함량으로 550만 온스의 대규모 노천 자원을 보유하고 있으며, 추정 자원으로는 0.53 g/t 금 함량의 42만 온스가 있습니다. 주요 교차 구간으로는 654미터에서 26.18미터 구간에 2.52 g/t 금, 208.8미터에서 은과 구리 크레딧이 포함된 0.31 g/t 금 함량의 21.21미터 구간이 포함됩니다. 이 발견은 현재 자원 확인, 폐기물 감소 및 광물화 확장 가능성 테스트를 목표로 하는 5,500미터 시추 프로그램의 일부입니다.
Axcap Ventures a annoncé des résultats de forage significatifs issus de son premier trou (CV25-001C) sur le projet Converse, situé dans la tendance Battle Mountain-Eureka au Nevada. Le forage a confirmé une minéralisation aurifère proche de la surface et découvert une nouvelle zone à haute teneur en profondeur, interceptant 10,85 mètres à 5,45 g/t d'or à une profondeur de 666,4 mètres. Le projet héberge actuellement une importante ressource à ciel ouvert de 5,5 millions d'onces à 0,53 g/t dans les catégories mesurée et indiquée, ainsi que 420 000 onces à 0,53 g/t en catégorie inférée. Les intersections clés incluent 26,18 mètres à 2,52 g/t d'or à partir de 654 mètres et 21,21 mètres à 0,31 g/t d'or avec crédits en argent et cuivre à partir de 208,8 mètres. Cette découverte fait partie d'un programme de forage de 5 500 mètres visant à confirmer les ressources actuelles, réduire les déchets et tester les opportunités d'expansion de la minéralisation.
Axcap Ventures hat bedeutende Bohrergebnisse aus dem ersten Bohrloch (CV25-001C) des Converse-Projekts im Battle Mountain-Eureka Trend in Nevada bekannt gegeben. Die Bohrung bestätigte eine oberflächennahe Goldmineralisierung und entdeckte in der Tiefe eine neue hochgradige Zone mit einem Abschnitt von 10,85 Metern bei 5,45 g/t Gold in 666,4 Metern Tiefe. Das Projekt verfügt derzeit über eine große Tagebau-Ressource von 5,5 Millionen Unzen mit 0,53 g/t in den Kategorien gemessen und angezeigt sowie über 420.000 Unzen mit 0,53 g/t in der Kategorie vermutet. Wichtige Abschnitte umfassen 26,18 Meter bei 2,52 g/t Gold ab 654 Metern und 21,21 Meter bei 0,31 g/t Gold mit Silber- und Kupfergutschriften ab 208,8 Metern. Die Entdeckung ist Teil eines 5.500 Meter umfassenden Bohrprogramms zur Bestätigung der aktuellen Ressourcen, zur Reduzierung von Abraum und zur Prüfung von Möglichkeiten zur Erweiterung der Mineralisierung.
Positive
  • Discovery of new high-grade zone with 10.85m at 5.45 g/t gold below current pit shell
  • Existing large resource base of 5.5 Moz measured and indicated at 0.53 g/t gold
  • Multiple mineralized intersections including 26.18m at 2.52 g/t gold from 654m depth
  • Potential for resource expansion both below and adjacent to current pit shell
Negative
  • Deep mineralization at 654-677m may require underground mining evaluation
  • Current resource grade is relatively low at 0.53 g/t gold

TORONTO, ON / ACCESS Newswire / June 16, 2025 / Axcap Ventures Inc. (CSE:AXCP)(OTC:GARLF) ("Axcap" or the "Company") is pleased to announce results from the first hole, CV25-001C, in its ongoing 5,500-meter drill program at the Converse Project, located in the Battle Mountain-Eureka Trend, Nevada.

Highlights

  • The first hole from Axcap's maiden drill campaign, CV25-001C, has confirmed modelled near-surface gold mineralization but has intersected a potentially new zone of higher-grade mineralization at depth.

  • The 10.85m at 5.45g/t in Axcap's first ever drillhole demonstrates a new component of mineralization that has not been explored or modelled by prior operators. Full Details of the intersection can be found in Table 1 and 2.

  • The Converse project already hosts a large open pit resource containing 5.5 Moz mineral resource at 0.53 g/t in the measured and indicated categories and 420koz at 0.53 g/t in the inferred category (run at a gold price of US$2,000/oz) (for more information see the Technical Report - https://www.sedarplus.ca/csaparty/records/document.html?id=f5fc799144448597be7850499f79385bbb7bdd3a8ced42847e6c2ffe92bea62a )

Key results from CV25-001 include:

  • 26.18 meters grading 2.52 g/t gold from 654 meters depth, including a core intersection of 10.85 meters grading 5.45 g/t gold from 666.4 meters. (Figure 1, Table 3)

  • 21.21 meters grading 0.31g/t Au, 9.71g/t Ag and 0.18% Cu starting from 208.8msupporting and potentially expanding the current open pit resource. (Table 2)

Details

  • The drill hole is hosted in retrograde skarn altered limey sandstone, containing abundant sulphide minerals.

  • Recall that the 2025 drill program was designed to confirm the current open-pit resource estimate (described above), reduce the internal waste and strip ratio, and importantly, test for mineralization both below and adjacent to the current pit shell, where it remains open for expansion.

  • Axcap is currently awaiting results for the balance of CV25-001C as well as CV25-002C, the later hole targeted mid-plate rocks, below the Golconda Thrust , for the first time at Converse. These mid-plate rocks are known to host ore zones in mines flanking the Buffalo Valley.

Blake McLaughlin, VP Exploration, stated: " This intersection significantly expands the mineralized area at Converse and validates our exploration approach. The high-grade interval clearly demonstrates the potential for meaningful discoveries of new sub-sets of higher-grade mineralization within these favorable rock units. We anticipate continued positive results from our ongoing drilling program throughout the summer . "

Figure 1: Long-Section Through Converse - Looking West

Figure 2: Converse Is Already A Large Nevada Resource (Contained Gold Oz)

Source: S&P Capital IQ, Converse 2025 MRE was calculated using the costs and values of $2000au, $2.00/t mined mining cost, $4.50/t processed processing cost, $1.00/t processed G&A, $2.50/oz refining, 77%/62%/50% recoveries for oxide/transition/sulphide respectively, 6% NSR, slope angles used range from 36-41 degrees.

Table 1: Drill Hole Parameters

HoleNo

Coordinate System

Easting

Northing

Elevation

Azimuth

Dip

Depth (m)

CV25-001C

NAD 83 UTM Zone 11

477,333

4,505,813

1,518

96

-56

701

Table 2: Upper Interval in CV25-001C with 21.21 meters grading 0.31g/t Au, 9.71g/t Ag and 0.18% Cu

From (m)

To (m)

Sample Designation

Au Final (ppm)

Ag Final (ppm)

Cu Final (ppm)

208.8

209.4

K730917

1.115

39.6

6630

209.4

210.0

K730918

0.111

1.3

277

210.0

210.8

K730919

0.061

0.3

103

210.8

211.1

K730921

0.034

1.0

139

211.1

212.0

K730922

0.203

0.7

61

212.0

212.6

K730923

0.068

3.6

581

212.6

213.2

K730924

0.051

0.6

76

213.2

213.6

K730925

1.165

3.6

67

213.6

215.2

K730926

0.023

0.3

75

215.2

215.9

K730927

0.019

0.7

130

215.9

216.4

K730928

0.323

18.6

3590

216.4

217.2

K730929

0.076

1.9

323

217.2

217.5

K730931

0.130

4.7

612

217.5

218.0

K730932

1.770

101.0

17500

218.0

218.7

K730933

0.277

10.1

2380

218.7

219.6

K730934

0.161

1.1

178

219.6

220.7

K730935

0.050

1.3

195

220.7

221.7

K730936

0.207

0.9

111

221.7

222.0

K730937

2.990

144.0

28600

222.0

222.3

K730938

0.136

5.2

959

222.3

223.1

K730939

0.022

1.3

179

223.1

223.4

K730941

3.180

67.4

13550

223.4

224.7

K730942

0.074

1.5

170

224.7

225.3

K730943

0.087

3.1

510

225.3

225.9

K730944

0.226

38.5

7210

225.9

226.3

K730945

0.268

7.3

1355

226.3

227.1

K730946

0.534

6.1

583

227.1

227.4

K730947

0.078

2.1

380

227.4

228.8

K730948

0.101

1.2

110

228.8

229.3

K730949

0.111

0.3

99

229.3

230.0

K730951

0.255

0.3

75

Table 3: Full Assays for New Zone Below Current Resource in CV25-001C

From (m)

To (m)

Sample Designation

Au Final (ppm)

Ag Final (ppm)

Cu Final (ppm)

654.1

655.6

K731361

0.254

0.3

13

655.6

656.7

K731362

0.113

0.3

12

656.7

658.1

K731363

0.433

0.3

33

658.1

659.4

K731364

0.227

0.3

26

659.4

660.8

K731365

1.780

0.3

74

660.8

661.7

K731366

0.729

0.3

34

661.7

662.6

K731367

0.197

0.6

193

662.6

663.2

K731368

0.202

2.8

898

663.2

664.3

K731369

0.034

0.3

161

664.3

665.7

K731371

0.407

0.3

53

665.7

666.4

K731372

0.157

2.2

605

666.4

667.1

K731373

2.510

18.0

5880

667.1

667.9

K731374

2.330

1.4

369

667.9

669.0

K731375

30.500*

3.3

241

669.0

670.1

K731376

3.050

0.9

318

670.1

671.1

K731377

1.165

1.2

318

671.1

671.8

K731378

0.286

0.3

78

671.8

672.8

K731379

0.188

0.3

139

672.8

674.2

K731381

0.456

0.3

67

674.2

675.7

K731382

8.230

1.5

120

675.7

677.3

K731383

3.190

1.3

301

677.3

678.8

K731384

0.528

0.3

88

678.8

680.3

K731385

0.352

0.9

246

*Metallic Screen pending for >10g/t sample overlimit trigger procedure

Quality Control & Quality Assurance

Drill holes are either collared with a PQ drill bit or pre-collared with an RC rig through overburden. Holes are reduced to HQ as the drill hole progresses into deeper more competent ground. Drill core produced by coring drill rigs is hydraulically extracted from the core tubes by the drill contractor, marked for consistent orientation and placed in core boxes with appropriate depth markers added. Full core boxes are then sealed before being transported by Axcap personnel to the Carlin Coreshack. Core is processed, geologically and geotechnically logged, checked for recovery, photographed, and marked for specific gravity, geotechnical studies and for assays. The core is cut in half onsite at the Coreshack, half-core is placed in plastic bags, zip-tied and grouped in burlap sacks and sealed for transport to the ALS Global sample preparation facility in Elko, Nevada. Sample preparation is done according to ALS Global code PREP-31Y. Once samples are prepared, ALS Global internally ships the samples to their assay laboratory in Reno, Nevada. The primary assay methods used are ALS Global codes Au-AA23 and ME-ICP61. The gold overlimit methods are Au-GRA21 and Au-SCR21 (overlimit triggers are 3 ppm and 10 ppm respectively). ALS Global is an independent, ISO-accredited laboratory with no affiliation to Axcap Ventures beyond its role as a third-party analytical service provider. The retained half-core is stored in a fenced-in yard until transported to the company's warehouse in Lovelock, Nevada.

QA/QC is performed as each certificate is imported into Axcap's GeoSequel database. Performance charts are prepared for coarse blanks and all certified reference material used. Axcap uses OREAS standards for the Converse project. Performance charts are also reviewed regarding ALS lab prep and pulp duplicates on Webtrieve to identify potential analytical issues with coarse gold. Coarse blank above 10x over the lower detection limit (LDL) of the Au-AA23 method are re-run.

For certified reference materials, the certified mean is considered the target. The certified standard deviation is used to calculate the acceptable range. The acceptable range is defined as within 3 standard deviations from the certified mean.

Qualified Person

Mr. Blake Mclaughlin, P.Geo., registered with the Professional Geoscientists Ontario, is the Company's Vice President of Exploration and a Qualified Person, as defined by National Instrument 43-101 - Standards for Disclosure for Mineral Projects. Mr. Mclaughlin has verified the data through site visits, inspection of drill core, review of original assay certificates, and confirmation of QA/QC protocols. No limitations were encountered during the verification process, and the data is considered reliable for the purposes of this disclosure.

About Axcap Ventures Inc.

Axcap Ventures is focused on consolidating neglected resources in the USA and Canada that we believe are constrained by drilling not geology. Our goal is to deliver a portfolio of development ready gold resources into the next gold cycle and to raise capital and grow these neglected orebodies when conventional single asset explorers are shut out of the market.

For more information:

Blake McLaughlin, VP Exploration
Bmclaughlin@axcapventures.ca
Info@axcapventures.ca
www.axcapventures.ca

On behalf of the Board of Directors,

Mario Vetro, Co-Founder and Director
For further information, please contact the Company at +1 (604) 687 7130

Cautionary Statement Regarding "Forward-Looking" Information

This news release includes certain statements that may be deemed "forward-looking statements". All statements in this new release, other than statements of historical facts, that address events or developments that the Company expects to occur, are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur and specifically include statements regarding: the Company's strategies, expectations, planned operations or future actions, including but not limited to exploration programs at its Converse Project and the results thereof. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements.

Investors are cautioned that any such forward-looking statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. A variety of inherent risks, uncertainties and factors, many of which are beyond the Company's control, affect the operations, performance and results of the Company and its business, and could cause actual events or results to differ materially from estimated or anticipated events or results expressed or implied by forward looking statements. Some of these risks, uncertainties and factors include: general business, economic, competitive, political and social uncertainties; risks related to the effects of the Russia-Ukraine war; risks related to climate change; operational risks in exploration, delays or changes in plans with respect to exploration projects or capital expenditures; the actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; changes in labour costs and other costs and expenses or equipment or processes to operate as anticipated, accidents, labour disputes and other risks of the mining industry, including but not limited to environmental hazards, flooding or unfavorable operating conditions and losses, insurrection or war, delays in obtaining governmental approvals or financing, and commodity prices. This list is not exhaustive of the factors that may affect any of the Company's forward-looking statements and reference should also be made to the Company's short form base shelf prospectus dated April 16, 2025, and the documents incorporated by reference therein, filed under its SEDAR+ profile at www.sedarplus.ca for a description of additional risk factors.

Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made. Except as required by applicable securities laws, the Company undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.

SOURCE: AXCAP VENTURES INC.



View the original press release on ACCESS Newswire

FAQ

What were the key drilling results from Axcap Ventures (GARLF) at the Converse Project?

The first hole CV25-001C intersected 10.85 meters grading 5.45 g/t gold at depth and 26.18 meters grading 2.52 g/t gold from 654 meters, along with near-surface mineralization of 21.21 meters at 0.31 g/t Au.

What is the current resource size at Axcap's Converse Project?

The Converse Project hosts 5.5 million ounces at 0.53 g/t gold in the measured and indicated categories, plus 420,000 ounces at 0.53 g/t in the inferred category.

Where is the Converse Project located and what is the scope of the current drilling program?

The Converse Project is located in the Battle Mountain-Eureka Trend, Nevada. The current program involves 5,500 meters of drilling to confirm resources, reduce waste, and test for mineralization expansion.

What is the significance of the new high-grade zone discovered by GARLF at Converse?

The high-grade zone represents a previously unexplored component of mineralization below the current pit shell, demonstrating potential for meaningful discoveries and resource expansion.

What are the next steps for Axcap Ventures at the Converse Project?

The company is awaiting results from the remainder of hole CV25-001C and CV25-002C, with ongoing drilling planned throughout the summer targeting mid-plate rocks below the Golconda Thrust.
Axcap Ventures

OTC:GARLF

GARLF Rankings

GARLF Latest News

GARLF Stock Data

242.93M