STOCK TITAN

NG ENERGY ANNOUNCES ARUCHARA-5 WELL DRILLING RESULTS AT MARIA CONCHITA

(Moderate)
(Positive)
Tags

NG Energy (TSX:GASX, OTCQX:GASXF) reported successful drilling of the Aruchara-5 well at the Maria Conchita Block in Colombia.

Aruchara-5 reached 9,097 feet, encountered gas across H1–H6 zones, and is producing 11 MMcf/d gross, lifting Maria Conchita output to 18 MMcf/d gross and total Company net production to about 23.2 MMcf/d.

Loading...
Loading translation...

Positive

  • Aruchara-5 initial production of 11 MMcf/d gross (8.8 MMcf/d net) from H1
  • Maria Conchita field production increased to 18 MMcf/d gross (14.4 MMcf/d net)
  • Total Company net production reached approximately 23.2 MMcf/d across Maria Conchita and Sinu-9
  • Gas encountered across six zones (H1–H6) at Aruchara-5 with positive indications
  • Maria Conchita infrastructure supports up to 30 MMcf/d gross (24 MMcf/d net) capacity
  • Premium Colombian spot gas pricing around US$11.50–13.00/Mcf for incremental volumes

Negative

  • None.

News Market Reaction – GASXF

+3.48%
+3.48% Session close to close

In the May 28 session, GASXF gained 3.48%, reflecting a moderate positive market reaction.

Data tracked by StockTitan Argus on the day of publication.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google
  • Aruchara-5 successfully drilled to a total depth of 9,097 feet, hitting the H1 target as designed and passing through the H2, H3, H4, H5 and H6 zones, with all zones showing positive results of gas at the surface and through wireline logs
  • Aruchara-5 has been completed and connected to the central processing facility and an evaluation of well performance is underway through the CPF with new gas volumes being sold into the Colombian marketplace
  • Initial production from the H1 target has come up to 11.0 MMcf/d gross (8.8 MMcf/d net) with a THP of 1600 psi with a choke of 32/64
  • Total field production at Maria Conchita has increased to 18 MMcf/d gross (14.4 MMcf/d net) following the addition of Aruchara-5, bringing combined Company net production across both Maria Conchita and Sinu-9 to approximately 23.2 MMcf/d
  • The work program at Maria Conchita through year-end includes a well intervention at Aruchara-3, a workover at Aruchara-1, and planning of the Aruchara-6 development well

CALGARY, AB, May 28, 2026 /PRNewswire/ - NG Energy International Corp. ("NGE" or the "Company") (TSX: GASX) (OTCQX: GASXF) is pleased to announce the results from the drilling of the Aruchara-5 well at the Maria Conchita Block (80% working interest) and subsequent work program at Maria Conchita for the remainder of 2026.

Aruchara-5 Well Drilling Results

The Aruchara-5 well has been successfully drilled to a total depth of 9,097 feet, hitting the H1 target as designed and passing through the H2, H3, H4, H5 and H6 zones, with all zones showing positive results of gas at the surface and through wireline logs. Aruchara-5 has been completed and connected to the central processing facility at Maria Conchita (the "CPF") and an evaluation of well performance is underway through the CPF, with new gas volumes being sold into the Colombian marketplace.

Initial production from Aruchara-5 has delivered rates of 11 MMcf/d gross (8.8 MMcf/d net) at a wellhead pressure of 1,600 psi across the H1 zone. The addition of Aruchara-5 has brought total field production at Maria Conchita to 18 MMcf/d gross (14.4 MMcf/d net). Combined with average gross daily production of 22.5 MMcf/d (8.8 MMcf/d net) at Sinú-9 since Hechicero-1X was brought online, total Company net production is approximately 23.2 MMcf/d.

The Company's contracted offtake agreements at Maria Conchita cover volumes up to 15 MMcf/d gross, with all incremental volumes above this threshold being sold into the Colombian spot market at approximately US$11.50/Mcf. At Sinú-9, the Company maintains contracted offtake agreements up to 25 MMcf/d gross, with all incremental volumes above this threshold expected to be sold into the Colombian spot market at approximately US$13.00/Mcf. Both fields benefit from a structurally premium Colombian natural gas pricing environment, with spot pricing upside expected to increase as combined Company production scales through the remainder of 2026.

Maria Conchita 2026 Work Program

With Aruchara-5 now connected and producing, the Company is advancing a comprehensive work program at Maria Conchita through the remainder of 2026, which is designed to optimize production across the field and sustain capacity growth:

  • Aruchara-3 – Well Intervention: a sand cleanup operation is planned to optimize and increase production rates from Aruchara-3, while also advancing the Company's understanding of the H4 zone.
  • Aruchara-1 – Workover: a workover is planned at Aruchara-1, incorporating sand management to restore and increase production while testing new zones.
  • Aruchara-6 – New Well: following the results of Aruchara-5, the Company plans to drill Aruchara-6 as the next development well at Maria Conchita, with spudding targeted in Q3 2026.

The Maria Conchita Block benefits from infrastructure supporting up to 30 MMcf/d gross (24 MMcf/d net) of processing and transportation capacity, providing the runway to monetize production growth from the ongoing work program.

Brian Paes-Braga, Executive Chairman of NGE, commented: "Aruchara-5 has confirmed productive gas across all six zones from H1 through H6 and is now connected and selling into the market – we are already seeing the commercial benefit of this program. Combined with Sinú-9 averaging 22.5 MMcf/d since Hechicero-1X was brought online, total Company net production has reached approximately 23.2 MMcf/d, with pace of growth increasing into the second half of this year as Maurel & Prom advances the six-well campaign at Sinú-9 and we execute our expanding work program at Maria Conchita. With Aruchara-6 on the horizon and a fully funded program in place through year-end, NGE has never had a more active operational program than it does today."

About NG Energy International Corp.

NG Energy International Corp. is a growth-orientated natural gas exploration and production company focused on delivering long-term shareholder and stakeholder value through the discovery, delineation and development of large-scale oil and gas fields in the Americas, supporting energy transition and economic growth. NGE's team has extensive technical and capital markets expertise with a proven track record of building companies and creating significant value in North and South America. In Colombia, the Company is executing on this mission with a rapidly growing production base and an industry-leading growth trajectory, delivering natural gas into the premium-priced Colombian marketplace with  a goal of being a material supplier of clean natural gas to Colombia and a broader vision of becoming a global energy platform business and providing prosperity for all stakeholders. Over the past 3 years, the Company has successfully raised and deployed over US$200 million in debt and equity, monetized 40% of one of its assets for US$150 million in cash and has partnered in the construction and commissioning of 3 gathering, processing and treatment facilities and associated pipelines with significant capital contributions from insiders who currently own approximately 32% of the Company. For more information, please visit SEDAR+ (www.sedarplus.ca) and the Company's website (www.ngenergyintl.com).

Cautionary Statement Regarding Forward-Looking Information

This news release contains "forward-looking information" and "forward-looking statements" (collectively, "forward-looking statements") within the meaning of the applicable Canadian securities legislation. All statements, other than statements of historical fact, are forward-looking statements and are based on expectations, estimates and projections as at the date of this news release, including, without limitation, statements related to drilling activities at both the Sinu-9 Block and the Maria Conchita Block, future spot market prices of the Company's natural gas and the Company's 2026 work program at Maria Conchita. Any statement that involves discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as "expects", or "does not expect", "is expected", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates", "believes" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking statements.

Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Factors that could cause actual results to differ materially from those anticipated in these forward-looking statements are described under the caption "Risk Factors" in the Company's most recent Management Discussion and Analysis and its Annual Information Form dated March 27, 2026, which are available for view on SEDAR+ at www.sedarplus.ca. These risks include but are not limited to, the risks associated with the oil and natural gas industry, such as exploration, production and general operational risks, the volatility of pricing for oil and natural gas, the inability to market natural gas production and changes in natural gas sale prices, changing investor sentiment about the oil and natural gas industry, any delays in production, marketing and transportation of natural gas, drilling costs and availability of equipment, regulatory approval risks and environmental, health and safety risks. Forward-looking statements contained herein are made as of the date of this news release, and the Company disclaims, other than as required by law, any obligation to update any forward-looking statements whether as a result of new information, results, future events, circumstances, or if management's estimates or opinions should change, or otherwise. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, the reader is cautioned not to place undue reliance on forward-looking statements.

No securities regulatory authority has either approved or disapproved the contents of this news release. The Toronto Stock Exchange accepts no responsibility for the adequacy or accuracy of this news release.

Abbreviations

The abbreviations set forth below have the following meanings:

Oil, Natural Gas Liquids and Natural Gas




Mcf/d

thousand cubic feet per day




MMcf/d

million cubic feet per day




NGL

natural gas liquids









Other





psi

pounds per square inch




Q3

third quarter




THP

tubing head pressure




Information Regarding the Company's Working Interest Disclosure

With regard to the Company's working interests held in both the Maria Conchita and Sinu-9 Blocks, which are held by MKMS Enerji Sucursal Colombia ("MKMS Colombia"), the Colombian branch of the Company's indirect wholly-owned subsidiary, Operadora NG Energy International, S.A. (formerly, MKMS Enerji Anonim Sirketi S.A.) ("Operadora"), in both the context of this news release and the Company's previous news releases, the term "working interest", ultimately refers to the rights and obligations agreed to, eventually, materialize a contractual interest in an exploration and production contract before the ANH, subject to the fulfillment of certain conditions. These conditions involve the assumption of financial risks and are generally linked to exploration by virtue of joint operating agreements. Once such conditions are fulfilled, the acquisition of a registered contractual interest, as party of record, in the exploration and production contract may materialize, by way of a request for approval of assignment before the ANH. For this reason, as is common practice within the oil and natural gas industry as a whole, the disclosed "working interest" may not coincide with the Company's current contractual interest in the exploration and production contract.

The assignment and allocation of "working interests" does not affect or undermine, in any way, the rights and obligations of registered parties under the relevant exploration and production contracts. Registered parties, such as Operadora, remain wholly and totally liable before the ANH, the Colombian authorities and third parties in connection with any and all obligations, risks and liabilities derived from the execution, performance or termination of the exploration and production contracts. Conversely, the rights and obligations that comprise "working interests" are only enforceable vis a vis between the executing parties under private agreements, and have no legal effects before the ANH, the Colombian authorities or third parties.

With respect to the Sinu-9 Block, the Company (through Operadora and MKMS Colombia) is a party of record and holds a 39% contractual interest in the exploration and production contract for the Sinu-9 Block granted by and entered into with ANH. With respect to the Maria Conchita Block, the Company (through Operadora and MKMS Colombia) holds 100% of the contractual interest as the sole party and operator of record under the relevant exploration and production contract entered into with the ANH, and holds an 80% working interest under private agreements with third parties.

Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/ng-energy-announces-aruchara-5-well-drilling-results-at-maria-conchita-302783753.html

SOURCE NG Energy International Corp.

FAQ

What are the Aruchara-5 drilling results for NG Energy (OTCQX:GASXF)?

Aruchara-5 was drilled to 9,097 feet and confirmed gas across six zones. According to NG Energy, all H1–H6 intervals showed positive gas at surface and on wireline logs, supporting the well’s connection to the Maria Conchita central processing facility.

How much gas is NG Energy producing from Aruchara-5 at Maria Conchita?

Aruchara-5 is initially producing 11 MMcf/d gross and 8.8 MMcf/d net from the H1 zone. According to NG Energy, this is at 1,600 psi wellhead pressure with a 32/64 choke, contributing meaningfully to field output.

What is NG Energy’s total gas production after Aruchara-5 came online?

Total Company net production is about 23.2 MMcf/d after Aruchara-5 startup. According to NG Energy, Maria Conchita now produces 18 MMcf/d gross and Sinú-9 has averaged 22.5 MMcf/d gross since the Hechicero-1X well was brought online.

What gas offtake agreements support NG Energy’s Maria Conchita production (GASXF)?

Maria Conchita has contracted offtake up to 15 MMcf/d gross, with extra volumes sold on the Colombian spot market. According to NG Energy, incremental gas above this level currently realizes around US$11.50 per Mcf, benefiting from structurally premium pricing.

What are the 2026 work program plans at Maria Conchita for NG Energy?

NG Energy plans an intervention at Aruchara-3, a workover at Aruchara-1, and drilling Aruchara-6 in Q3 2026. According to NG Energy, this program aims to optimize production and support sustained capacity growth at the Maria Conchita Block.

How much processing capacity does NG Energy have at the Maria Conchita Block?

Maria Conchita infrastructure can handle up to 30 MMcf/d gross, or 24 MMcf/d net, of gas. According to NG Energy, this existing capacity provides runway to monetize additional production from Aruchara-5, planned well work, and the future Aruchara-6 development well.