Hemlo Mining Corp. Reports Third Quarter 2026 Operating Results

Higher processed grades and recovery lifted quarterly gold output while an electrical outage delayed the planned production ramp-up.

(Moderate)

Sentiment and the balance of points

Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.

Tags

Hemlo Mining (HMMCF) reported third-quarter 2026 gold production of 29,617 ounces, up from the previous quarter despite an underground power outage. Production rose from 27,858 ounces in Q2 as processed grade increased to 3.00 grams per tonne from 2.62 and recovery reached 95.0% versus 94.3%. Attributable production was 25,652 ounces, with attributable sales of 29,830 ounces.

The substation outage constrained mining and delayed the planned production ramp-up. A relocated substation was commissioned after quarter-end; the company expects replacement equipment in December 2026. Production drilling increased 35% and paste filling 13% from Q2. Seven equipment units valued at approximately $8.5 million arrived, bringing deliveries to 17 of 21 planned units. Hemlo also initiated bulk-mining tests beneath the historical open pit. Preliminary cash stood at $144.778 million at September 30, versus $131.956 million at December 31, 2025.

Loading...
Loading translation...
13 points · 0 major

How this balance works

Rhea-AI gives every point it takes from this document a weight. Minor counts 1, Moderate 3 and Major 9, so one Major point outweighs several Minor ones. The bar adds up the weights on each side, and when neither side holds more than 65% of the total the balance reads Mixed.

It reads the document as published, with the same rules for every company, and it does not look at what the market expected or at how the stock traded, so a point can be objectively good on a day the stock falls.

Rhea-AI Sentiment measures something else, the tone of the wording.

0 major · 4 points

Hollow bars mark forward-looking points. How the balance works

Positive

  • Moderate pointQ3 gold production rose to 29,617 ounces from 27,858 ounces in Q2 2026.
  • Moderate pointAttributable gold sales increased to an estimated 29,830 ounces from 27,858 in Q2, subject to final settlement adjustments.
  • Moderate pointPreliminary net cash reached $2.278 million versus net debt of $93.044 million at December 31, 2025.
  • Moderate pointRelocated substation was commissioned after quarter-end to address the underground power outage.
  • Minor pointProcessed grade increased to 3.00 grams per tonne from 2.62 in Q2.
8 minor points
  • Minor pointGold recovery improved to 95.0% from 94.3% in Q2.
  • Minor pointPreliminary cash rose to $144.778 million at September 30 from $131.956 million at December 31, 2025.
  • Minor pointProduction drilling increased 35% compared with Q2.
  • Minor pointPaste filling increased 13% compared with Q2.
  • Minor pointEquipment deliveries reached 17 of 21 planned units, including seven valued at approximately $8.5 million during Q3.
  • Minor point. Forward-looking: it has not happened yet and may not happen.Bulk-mining test work began beneath the historical open pit; first test-stope production drilling is expected imminently.
  • Minor pointWorkforce expansion brought staffing to 555 full-time workers alongside 373 contractors.
  • Minor pointQ3 safety and environmental performance included no lost-time injuries and no reportable environmental incidents.

Negative

  • Moderate pointSubstation outage delayed the production ramp-up and kept mining, development and exploration below planned rates.
  • Minor point. Forward-looking: it has not happened yet and may not happen.Replacement substation delivery remains pending, with the company targeting December 2026.
  • Minor pointOre processed declined to 342,000 tonnes in Q3 from 344,000 tonnes in Q2.
  • Minor pointSkilled-labour competition remains a hiring headwind.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

TORONTO, Oct. 21, 2026 /PRNewswire/ -- Hemlo Mining Corp. (TSX: HMMC) (OTCQX: HMMCF) ("Hemlo Mining" or the "Company") is pleased to report operating results for the third quarter ended September 30, 2026 ("Q3" or "Q3 2026"). The Company plans to release its Q3 2026 financial results after market close on Monday, November 9, 2026, followed by a conference call and webcast hosted by senior management on Tuesday, November 10, 2026 at 11:00 AM Eastern Time.

Hemlo Mining Corp. Logo

(All amounts expressed in U.S. dollars unless otherwise stated and are unaudited)

Jason Kosec, President, CEO & Director of Hemlo Mining, commented: "Q3 demonstrated the resilience of the operation and the dedication of our workforce. Despite operational challenges during the quarter, we delivered stable gold production with an improved grade profile compared to Q2 while continuing to advance key operational initiatives. We also saw positive trends across several important operating metrics, including a 35% increase in production drilling and a 13% increase in paste filling compared to Q2, supporting consistent production and development rates throughout the quarter. In addition, we expanded our workforce, continued building out the underground fleet and advanced bulk mining test work, helping to strengthen the foundation for future production growth and greater operating flexibility. With 17 of 21 planned equipment units now delivered and several growth initiatives advancing as planned, we believe the Mine is increasingly well positioned to deliver improved operating performance and continue building momentum into 2027."

Third Quarter 2026 Operating Highlights



Three months ended

Three months ended

Nine months ended

Hemlo Mine

Unit

September 30, 2026

June 30, 2026

September 30, 2026

Williams





Ore processed

000t

297

283

810

Average grade

g/t

2.53

2.53

2.77

Gold produced1

oz.

21,688

22,516

68,839






Interlake2





Ore processed2

000t

45

61

198

Average grade2

g/t

6.15

3.05

3.97

Gold produced1,2

oz.

7,929

5,342

23,400






Total ore processed

000t

342

344

1,008

Average grade processed

g/t

3.00

2.62

3.00

Recovery

%

95.0

94.3

95.0

Total gold produced1

oz.

29,617

27,858

92,239

Total gold sold

oz.

32,424

32,425

103,534






Attributable gold produced1,3

oz.

25,652

25,188

80,539

Attributable gold sold3

oz.

29,830

27,858

89,740

1.

Gold produced represents gold poured during the period.

2.

Operating statistics are presented on a 100% basis. The Interlake claims are subject to a 50% net profits interest ("NPI") royalty with Franco-Nevada Corporation.

3.

Attributable gold is calculated as 100% of gold from Williams and 50% of gold from Interlake. Attributable gold sold is estimated based on current-period production and remains subject to adjustment based on final settlement information.

The Hemlo Gold Mine ("Hemlo" or the "Mine") continued its strong safety and environmental performance in Q3, recording no reportable environmental incidents and no lost-time injuries. 

Gold production for Q3 totalled 29,617 ounces from 342,000 tonnes processed at an average grade of 3.00 grams per tonne gold. Attributable gold production for Q3 totalled 25,652 ounces and attributable gold sold totalled 29,830 ounces. Mine production averaged 3,718 tonnes per day during the quarter. Average gold recovery in the process plant for Q3 was 95.0%. Production benefited from access to higher-grade stopes within the Interlake zone, resulting in a higher average processed grade and increased gold production compared to the second quarter of 2026 ("Q2").

As previously disclosed, production ramp-up efforts during Q3 were impacted by the outage of an underground electrical substation servicing a portion of the Alimak production area. The outage reduced available power in the affected area, constraining mining rates and delaying the Company's planned production ramp-up. To mitigate the impact, the mine plan was temporarily re-sequenced and production activities were shifted to other areas of the Mine. The Company also reorganized electrical power distribution, which reduced the operational impact of the outage, although mining, development and exploration activities continued at lower rates than originally planned. Subsequent to quarter-end, the Company relocated and commissioned a similar substation from another area of the Mine. A replacement substation remains on track for delivery in December 2026. Despite the impact of the substation outage, the Company continued to make progress on several key operating metrics during the quarter. Production drilling increased by 35% compared to Q2, while paste filling increased by 13%, supporting stable production and development rates across the Mine. The improvements reflect ongoing investments in personnel, equipment and operational optimization initiatives designed to support future production growth and increased operating flexibility.

As part of the Company's strategy to support future production growth, several operational and growth initiatives continued to advance during Q3. Among these initiatives, the Company initiated test mining beneath the historical open pit using a local contractor to evaluate the potential application of bulk mining methods and support studies focused on increasing production and maximizing value at the Mine. Building on this work, production drilling on the first test stope is expected to commence imminently as part of the Company's assessment of bulk mining opportunities.

While competition for skilled labour remains an industry-wide headwind, Hemlo continues to make progress building its workforce through targeted recruiting, training and employee development initiatives. During Q3, Hemlo expanded recruiting and training efforts and now employs 555 full-time workers alongside 373 contractors, approximately 75% of whom are from surrounding communities.

As part of the Company's ongoing investment in the Mine, seven new pieces of mobile mine equipment valued at approximately $8.5 million were delivered during Q3. This included two MacLean bolters, one MacLean scissor lift, one MacLean boom truck, one Sandvik 45-tonne truck, one Sandvik two-boom drill jumbo and one Sandvik 11-cubic-yard scooptram. Since acquiring the Mine in November 2025, 17 of 21 planned new units have arrived on site. These additions are expected to support higher development rates, increase operational flexibility, improve equipment availability and provide additional capacity as the Mine continues progressing toward higher production levels.

Third Quarter 2026 Financial Position



As at September 30,

As at December 31,

Financial position

Unit

2026

2025

Cash

$'000s

144,778

131,956

Net cash (debt)1

$'000s

2,278

(93,044)

1.

This is a non-IFRS measure. For further information, refer to the "Non-IFRS Measures" section of this news release.

The financial information presented above is preliminary in nature and subject to completion of the Company's quarter-end financial reporting process. Final unaudited financial results may differ from these amounts and will be reported in the Company's unaudited interim condensed consolidated financial statements for the three and nine months ended September 30, 2026. Complete financial results for the third quarter 2026 will be reported and filed on Hemlo Mining's profile on SEDAR+ at www.sedarplus.ca on Monday, November 9, 2026.

Conference Call and Webcast

Hemlo Mining will host a conference call and webcast on Tuesday, November 10, 2026 at 11:00 AM Eastern Time to discuss third quarter 2026 results. Details for the conference call and webcast are included below.

Dial-In Numbers / Webcast:

Conference/Meeting ID: 287749816

North America Toll Free: +1 833-461-5787
International Toll: +1 585-542-9983
Canada Local: +1 365-657-4084

Webcast: https://events.q4inc.com/attendee/287749816

About Hemlo Mining Corp.

Hemlo Mining Corp. is a Canadian gold producer focused on operating and enhancing the Hemlo gold camp in northwestern Ontario. The Company's flagship asset, the Hemlo Gold Mine, has produced approximately 25 million ounces of gold since 1985 from both underground and open pit operations. The Company's fit-for-purpose strategy is centered on maximizing the value of the mine through improved operating efficiency, production growth, and mine life extension. Hemlo Mining is led by an experienced team with a track record of value creation in the global mining sector.

Qualified Person

The scientific and technical information contained in this news release has been reviewed and approved by Mike Tsafaras, P.Eng., the Company's Vice President, Engineering and Projects. Mr. Tsafaras is a "qualified person" as defined in National Instrument 43-101, Standards of Disclosure for Mineral Projects.

Forward-looking Statements 

This document contains certain forward-looking information and forward-looking statements within the meaning of applicable securities legislation (collectively "forward-looking statements"). The use of words such as "expects", "anticipates", "plans", "will," "may", "should" and similar expressions are intended to identify forward-looking statements. Forward-looking statements contained in this news release include statements regarding: the timing for release of the Company's Q3 2026 financial results, conference call and webcast; the Company's operational plans, including expanding the workforce, building out the underground mine fleet, advancing bulk mining test work and other mining initiatives, and the expectation that they will support higher development rates and increased operating flexibility; the timing of delivery of the replacement substation; and the Company's goals, plans, commitments, objectives and strategies.

These forward-looking statements are provided as of the date of this news release, or the effective date of the documents referred to in this news release, as applicable, and reflect predictions, expectations or beliefs regarding future events based on the Company's beliefs at the time the statements were made, as well as various assumptions made by and information currently available to management. In making the forward-looking statements included in this news release, the Company has applied several material assumptions, including, but not limited to: the Company's ability to carry on exploration, development, and mining activities; the timing and results of operational plans; mineral reserve and mineral resource estimates and the assumptions on which they are based; the Company's ability to operate in a safe, efficient, and effective manner; the Company's ability to attract and retain qualified personnel; that the Company's activities will be in accordance with the Company's public statements and stated goals; and that there will be no material adverse change or disruptions affecting the Company or the Hemlo mine. Consequently, there can be no assurances that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements.

We caution readers not to place undue reliance on these forward-looking statements. Forward-looking statements involve significant known and unknown risks and uncertainties, which could cause actual results to differ materially from those anticipated. These risks include, but are not limited to: uncertainty and variations in the estimation of mineral resources and mineral reserves; risks related to the Company's anticipated indebtedness and gold stream obligations; risks related to exploration, development, and operation activities; risks associated with the transition to an owner-operator model; risks related to the recruitment, training and retention of qualified personnel; equipment delivery, commissioning and operational performance risks; political risks, delays in obtaining or failure to obtain governmental permits, or non-compliance with permits; environmental and other regulatory requirements; uncertainties related to title to mineral properties; water rights; risks related to natural disasters, terrorist acts, health crises, and other disruptions and dislocations; financing risks and access to additional capital; risks related to guidance estimates and uncertainties inherent in the preparation of pre-feasibility studies; uncertainty in estimates of production, capital, and operating costs and potential production and cost overruns; the fluctuating price of gold; unknown liabilities in connection with the acquisition of the Hemlo mine; global financial conditions; uninsured risks; climate change risks; competition from other companies and individuals; conflicts of interest; volatility in the market price of the Company's securities; the Company's limited operating history; litigation risks; the Company's ability to successfully integrate the acquisition of the Hemlo mine; intervention by non-governmental organizations; outside contractor risks; risks related to historical data; risks related to the Company's accounting policies and internal controls; shareholder activism; other risks associated with executing the Company's objectives and strategies; and other risks set forth in the section entitled "Risk Factors" in the Company's Annual Information Form for the year ended December 31, 2025 filed with applicable Canadian securities regulatory authorities on April 15, 2026.

Except as required by the securities disclosure laws and regulations applicable to the Company, the Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change.

Non-IFRS Measures

The Company has included certain non-IFRS measures in this news release, as detailed below. In the mining industry, these are common performance measures and ratios; however, they may not be comparable to similar measures or ratios presented by other issuers and the non-IFRS measures and ratios do not have any standardized meaning. Accordingly, these measures and ratios are included to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS Accounting Standards. These measures do not have any standardized meaning prescribed under IFRS Accounting Standards, and therefore may not be comparable to other issuers.

Net cash (debt)

Net cash (debt) is a non-IFRS performance measure that is calculated as cash, as presented in the Interim Condensed Consolidated Statements of Financial Position, less the principal amount of borrowings, as presented in the Notes to the Interim Condensed Consolidated Financial Statements. The Company believes that this measure is useful to users in understanding the Company's financial leverage and liquidity.

Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/hemlo-mining-corp-reports-third-quarter-2026-operating-results-302915154.html

SOURCE Hemlo Mining Corp.

FAQ

AI-generated questions and answers. How Rhea-AI works. Not financial advice.

How much gold did Hemlo Mining produce in Q3 2026?

Hemlo produced 29,617 ounces of gold in Q3 2026, compared with 27,858 ounces in Q2. Attributable production was 25,652 ounces, versus 25,188 ounces in Q2. Higher-grade ore from the Interlake zone contributed to the increase in total production.

Why was Hemlo Mining's production ramp-up delayed in Q3 2026?

An underground electrical substation outage reduced power available to part of the Alimak production area and constrained mining rates. Hemlo temporarily changed its mining sequence and shifted production elsewhere. A relocated substation was commissioned after quarter-end, and the company expects replacement delivery in December 2026.

How does Hemlo Mining calculate attributable gold production?

Attributable gold production includes 100% of Williams gold and 50% of Interlake gold. Operating statistics otherwise present Interlake on a 100% basis. The Interlake claims carry a 50% net profits interest royalty with Franco-Nevada.

When will Hemlo Mining release its full Q3 2026 financial results?

Hemlo plans to release its full Q3 2026 financial results after market close on November 9, 2026. The preliminary financial figures remain subject to completion of quarter-end reporting and may differ from the final unaudited results.