IsoEnergy Commences 2025 U.S. Exploration Program
Rhea-AI Summary
IsoEnergy (NYSE American: ISOU) has launched its 2025 U.S. exploration program, focusing on uranium projects in southeast Utah. The program includes 10 surface rotary holes totaling 15,000 feet at the Flatiron claims in the Henry Mountains uranium district. The company's 8,800-acre Flatiron project is strategically positioned near the Tony M and Bullfrog deposits, in a district that has historically produced 1.4 million lbs of U3O8.
The exploration will target the Salt Wash Member of the Morrison Formation, with potential for both uranium and vanadium mineralization. Additionally, IsoEnergy continues fieldwork at its Daneros and Sage Plain past-producing mines, focusing on understanding the sedimentary framework to guide future exploration efforts. The company aims to position itself as a key domestic uranium supplier, particularly relevant amid discussions about expanding the U.S. Strategic Uranium Reserve.
Positive
- Strategic acquisition of 8,800 acres in the historically productive Henry Mountain District
- First company to follow up on promising historical drilling results from the 1980s
- Multiple past-producing mines ready for strategic restart
- Favorable positioning for U.S. Strategic Uranium Reserve expansion
Negative
- Exploration is in early stages with no guaranteed success
- Low-grade vanadium expectations in the host unit
News Market Reaction 1 Alert
On the day this news was published, ISOU gained 1.71%, reflecting a mild positive market reaction.
Data tracked by StockTitan Argus on the day of publication.
Philip Williams, CEO and Director of IsoEnergy, commented, "Commencing these exploration programs in
IsoEnergy staked the 370 lode claims that comprise the Flatiron project in 2024, later adding two
Strategically located along the projection of the trends of uranium mineralization from IsoEnergy's Tony M and Bullfrog (Energy Fuels Inc.) (NYSE American: UUUU; TSX: EFR) deposits, the Flatiron project benefits from a proven geological setting. Plateau Resources, the original developers of these deposits, previously conducted wide-spaced, district-scale drilling to identify uranium mineralization concealed beneath surface cover. These historic holes were drilled on centers of more than one-mile, with two of the highest-priority results located within the current Flatiron claims. Before Plateau Resources could advance these targets, depressed uranium prices in the 1980s forced the closure of regional mines. IsoEnergy's upcoming drill program will be the first to follow up on this work, positioning the Company to unlock growth potential in the Henry Mountain District.
___________________________ |
1 Mills, S.E. and |
_________________________ |
2 See Qualified Person Statement Below. |
3 As reported in the Technical Report on the Bullfrog Project, |
The target unit for the Flatron drilling is the lowest sandstone unit of the Salt Wash Member of the Morrison Formation. This is the primary host unit across the Henry Mountain district. This distinct sandstone package contains a suitable amount of reductant material and the hydrogeologic setting for uranium mineralization of commercially viable grade. Low grades of vanadium are also expected to be encountered in the host unit.
IsoEnergy's 2025 Utah exploration campaign will also focus on the continuing field work being conducted at the Daneros and Sage Plain properties. Like Tony M, both properties are past producers and have been on standby and ready for strategic restart. IsoEnergy has been focused on detailed field work designed to reveal the sedimentary framework that controls the local mineralization. This work includes mapping the extent of the prospective host units, and numerous detailed measured sections of the available outcrop used to identify modern analogs of the distributary channel systems to provide a conceptual target generation framework. This information is expected to guide future exploration, including determining the most appropriate geophysical survey techniques to locate the productive units without the need for expensive and pervasive surface drilling.
Qualified Person Statement
The scientific and technical information contained in this news release was reviewed and approved by Dr. Dan Brisbin, P.Geo., IsoEnergy's Vice President, Exploration, who is a "Qualified Person" (as defined in NI 43-101 – Standards of Disclosure for Mineral Projects).
For additional information with respect to the current mineral resource estimate for IsoEnergy's Tony M Deposit, please refer to the Technical Report prepared in accordance with NI 43-101 entitled "Technical Report on the Tony M Project,
About IsoEnergy Ltd.
IsoEnergy (NYSE American: ISOU and TSX: ISO) is a leading, globally diversified uranium company with substantial current and historical mineral resources in top uranium mining jurisdictions of
IsoEnergy also holds a portfolio of permitted past-producing, conventional uranium and vanadium mines in
X: @IsoEnergyLtd
www.isoenergy.ca
Cautionary Statement Regarding Forward-Looking Information
This press release contains "forward-looking information" within the meaning of applicable Canadian securities legislation and "forward-looking statements" within the meaning of
Forward-looking statements are necessarily based upon a number of assumptions that, while considered reasonable by management at the time, are inherently subject to business, market and economic risks, uncertainties and contingencies that may cause actual results, performance or achievements to be materially different from those expressed or implied by forward-looking statements. Such assumptions include, but are not limited to, assumptions that the results of planned exploration activities are as anticipated; the anticipated mineralization of IsoEnergy's projects being consistent with expectations; the price of uranium; ; assumptions regarding uranium market conditions and policy shifts; the anticipated cost of planned exploration activities; that general business and economic conditions will not change in a materially adverse manner; that financing will be available if and when needed and on reasonable terms; and that third party contractors, equipment and supplies and governmental and other approvals required to conduct the Company's planned activities will be available on reasonable terms and in a timely manner. Although IsoEnergy has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.
Such statements represent the current views of IsoEnergy with respect to future events and are necessarily based upon a number of assumptions and estimates that, while considered reasonable by IsoEnergy, are inherently subject to significant business, economic, competitive, political and social risks, contingencies and uncertainties. Risks and uncertainties include, but are not limited to the following: negative operating cash flow and dependence on third party financing; uncertainty of additional financing; no known mineral reserves; aboriginal title and consultation issues; reliance on key management and other personnel; actual results of technical work programs a being different than anticipated; changes in development and production plans based upon results; availability of third party contractors; availability of equipment and supplies; failure of equipment to operate as anticipated; accidents, effects of weather and other natural phenomena; other environmental risks; changes in laws and regulations; regulatory determinations and delays; stock market conditions generally; demand, supply and pricing for uranium; other risks associated with the mineral exploration industry; and general economic and political conditions in
View original content to download multimedia:https://www.prnewswire.com/news-releases/isoenergy-commences-2025-us-exploration-program-302558899.html
SOURCE IsoEnergy Ltd.

