RETRANSMISSION: Kodiak Reports Initial Mineral Resource Estimate on Four of Seven Mineralized Zones at the MPD Copper-Gold Project
Rhea-AI Summary
Kodiak Copper (OTCQB: KDKCF) has announced its initial Mineral Resource Estimate (MRE) for four of seven mineralized zones at its 100%-owned MPD copper-gold project in British Columbia. The estimate includes an Indicated Resource of 56.4 million tonnes grading 0.42% copper equivalent, containing 385 million pounds of copper and 0.25 million ounces of gold. The Inferred Resource totals 240.7 million tonnes at 0.33% copper equivalent, containing 1,291 million pounds of copper and 0.96 million ounces of gold.
The MRE covers the Gate, Ketchan, Man, and Dillard zones, with mineralization remaining open for expansion. The company plans to complete the full MRE in Q4 2025 by adding three additional zones (West, Adit, and South). The estimate uses a cut-off grade of 0.2% copper equivalent, with sensitivity analysis showing significant potential for increased tonnage at lower cut-off grades.
Positive
- Initial MRE demonstrates significant scale with 56.4Mt Indicated and 240.7Mt Inferred resources
- Substantial metal content: 385Mlbs Cu and 0.25Moz Au (Indicated) plus 1,291Mlbs Cu and 0.96Moz Au (Inferred)
- Mineralization remains open for expansion in multiple directions
- Three additional zones pending inclusion could further increase resource size in Q4 2025
- Lower cut-off grade sensitivity shows potential for significant resource expansion
Negative
- Current MRE only covers 4 out of 7 mineralized zones
- Relatively low copper equivalent grades (0.42% CuEq Indicated, 0.33% CuEq Inferred)
News Market Reaction – KDKCF
On the day this news was published, KDKCF gained 5.03%, reflecting a notable positive market reaction.
Data tracked by StockTitan Argus on the day of publication.
Vancouver, British Columbia--(Newsfile Corp. - June 26, 2025) - Kodiak Copper Corp. (TSXV: KDK) (OTCQB: KDKCF) (FSE: 5DD1) (the "Company" or "Kodiak") today reports the first part of its initial Mineral Resource estimate at the Company's
Highlights
Sizable copper- gold initial Mineral Resource estimate ("MRE") delineated for four of seven mineralized zones outlined to date at MPD: Gate, Ketchan, Man and Dillard. Figure 1
Indicated Mineral Resource: 56.4 million tonnes (Mt) grading
0.42% copper equivalent (CuEq) for 385 million pounds (Mlb) of copper (Cu) and 0.25 million ounces (Moz) of gold (Au). Table 1Inferred Mineral Resource: 240.7 million tonnes (Mt) grading
0.33% copper equivalent (CuEq) for 1,291 million pounds (Mlb) of copper (Cu) and 0.96 million ounces (Moz) of gold (Au). Table 1The MRE is defined using open pit design shells to constrain the Resource models and a cut-off grade of
0.2% CuEq. Sensitivity cases using lower cut-of grades have significantly higher tonnages and metal contents. Table 2Mineralization remains open for expansion within and beyond the MRE pit shells, in multiple directions and at depth.
The full MRE for MPD is planned for completion in Q4 with the addition of three further mineralized zones (West, Adit and South), where confirmation and infill drilling is currently under way as part of the Company's 2025 exploration program (see news release June 18, 2025).
The higher-grade, near surface mineralization identified at the West, Adit and South zones has the potential to make an important contribution to the full MRE. Figure 1
Webinar: Thursday, June 26th @ 9:00am PT (register here)
Join President & CEO Claudia Tornquist and Chairman Chris Taylor as they discuss the
Initial Mineral Resource Estimate for Kodiak Copper's MPD Project
Claudia Tornquist, President and CEO of Kodiak said, "The initial Resource estimate for MPD is an important strategic milestone for Kodiak and marks the culmination of six years of systematic exploration and district consolidation. The estimate released today is for only four of the seven mineralized zones that will form the full Mineral Resource estimate for MPD but it already shows the considerable scale and potential of the project. We are currently drilling the remaining three mineralized zones and plan to incorporate the results into the full Mineral Resource estimate for MPD by the end of this year. I am looking forward to the next stage in MPD's development as we progress towards economic evaluation."
Chris Taylor, Chairman of Kodiak said, "I've had the vision right from the start that MPD's rich mineral endowment holds the potential for a major mine in British Columbia and our initial Resource estimate clearly demonstrates this. We expect to grow this Resource estimate substantially with the inclusion of the remaining zones later this year. It is also worth noting that our sensitivity analysis shows a significant increase in tonnage and metal content when using a lower cut-off grade of

Figure 1: MPD Project - location map and Mineral Resources/mineralized zones
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/3803/256871_936fd39c54230b74_001full.jpg
Initial Mineral Resource Estimate
The drill hole density in the central part of the Gate Zone was sufficient to develop a 56.4 Mt Indicated Resource grading
Table 1: MPD Initial Mineral Resource Estimate
| MPD Initial Mineral Resource Estimate - Part 1 (4 of 7 zones) | ||||||||||
| Zone | Resource Category | Tonnes | Average Grade | Metal Content | ||||||
| (Mt) | Cu (%) | Au (g/t) | Ag (g/t) | CuEq (%) | Cu (Mlbs) | Au (Moz) | Ag (Moz) | CuEq (Mlbs) | ||
| Gate | Indicated | 56.4 | 0.31 | 0.14 | 1.18 | 0.42 | 385 | 0.25 | 2.14 | 522 |
| Gate | Inferred | 114.5 | 0.27 | 0.13 | 1.07 | 0.36 | 681 | 0.48 | 3.94 | 909 |
| Man | Inferred | 8.3 | 0.17 | 0.30 | 0.56 | 0.37 | 31 | 0.08 | 0.15 | 68 |
| Dillard | Inferred | 51.9 | 0.20 | 0.09 | 0.39 | 0.26 | 229 | 0.15 | 0.65 | 298 |
| Ketchan | Inferred | 66.0 | 0.24 | 0.12 | 1.09 | 0.33 | 349 | 0.25 | 2.31 | 480 |
| Total Indicated | 56.4 | 0.31 | 0.14 | 1.18 | 0.42 | 385 | 0.25 | 2.14 | 522 | |
| Total Inferred | 240.7 | 0.24 | 0.12 | 0.91 | 0.33 | 1,291 | 0.96 | 7.05 | 1,754 | |
Notes: 1. The Mineral Resources were estimated using the Canadian Institute of Mining, Metallurgy and Petroleum(CIM), Definition Standards for Mineral Resources and Reserves, as prepared by the CIM Standing Committee and adopted by CIM Council.
2. A cut-off grade of
3. Pit shell optimization used average recoveries derived from metallurgical test work of Cu
4. Copper equivalence (CuEq) and constraining pit shells assume metal prices (US$) of:
5. The copper equivalency equation used is: CuEq(%) = Cu(%) + Au(g/t) x 0.6606 + Ag(g/t) x 0.0069
6. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. There is no certainty that all or any part of the mineral resources will be converted into mineral reserves in the future. The MRE may be materially affected by considerations including, but not limited to, permitting, legal, sociopolitical, environmental issues, market conditions or other factors.
7. All figures are rounded to reflect the relative accuracy of the estimate. Totals may not sum due to rounding as required by reporting guidelines.

Figure 2: MPD Project - RPEEE shells used to constrain the Initial Mineral Resource Estimate
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/3803/256871_936fd39c54230b74_003full.jpg
Sensitivity Cut-off Grades
In addition to the base case cut-off grade ("COG") of
Table 2: Cut-Off Grade Sensitivity Summary
| MPD Initial Mineral Resource Estimate & Cut-Off Grade Sensitivity Scenarios | ||||||
| Cut-Off Grade | Indicated | Inferred | ||||
| (CuEq %) | Tonnes (Mt) | CuEq (%) | CuEq (Mlbs) | Tonnes (Mt) | CuEq (%) | CuEq (Mlbs) |
| 0.22 | 50.6 | 0.44 | 491 | 204.5 | 0.35 | 1,578 |
| 0.20 | 56.4 | 0.42 | 522 | 240.7 | 0.33 | 1,754 |
| 0.18 | 62.4 | 0.39 | 537 | 281.7 | 0.31 | 1,936 |
| 0.15 | 72.3 | 0.36 | 574 | 355.6 | 0.28 | 2,183 |
| 0.12 | 82.4 | 0.33 | 600 | 435.6 | 0.25 | 2,415 |
Notes: 1. Copper equivalence (CuEq) assumes metal prices (US$) of:
2. CuEq is based on average recoveries derived from metallurgical test work as applied in the pit optimization process. Average recoveries are: Cu
3. The copper equivalency equation used is: CuEq(%) = Cu(%) + Au(g/t) x 0.6606 + Ag(g/t) x 0.0069
Next Steps
Kodiak is actively advancing the MPD Project through the following key work streams and upcoming catalysts in 2025:
File a NI 43-101 Technical Report in support of this MRE on SEDAR+ within 45 days of this press release
Receive results from infill and confirmation drilling at West, Adit and South Zones - Q3/4 2025
Report a Resource Estimate for West, Adit and South Zones to complete initial MRE for MPD project -Q4 2025
Follow-up metallurgical testing
Plan further step-out, infill and exploration drilling
Continue environmental baseline studies and engagement with indigenous rightsholders and local stakeholders
Estimation Methods
The Resource estimate was completed by James N. Gray, P.Geo. of Advantage Geoservices Ltd., an Independent Qualified Person as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43-101) in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Standards on Mineral Resources and Mineral Reserves, adopted by CIM Council, as amended. Estimation methods are summarized below. The Gate and Man Resource estimates are controlled by an alteration model based on three-dimensional interpretation of drill results. Estimation control at Dillard and Ketchan is based on models of lithology. A total of 216 core drill holes, completed by Kodiak and previous operators through 2024, have been used for grade estimation at MPD-N; 70 holes at Gate, 47 at Man, 35 at Dillard and 64 at Ketchan. Of the 216 core holes drilled, 89 were completed under the supervision of Kodiak. Minor high-grade capping was applied to assay values to appropriately control the impact of outliers to copper, gold, and silver distributions, prior to compositing to a length of three metres. Grades at Gate were estimated by ordinary kriging; Man, Dillard and Ketchan grades were estimated by inverse distance weighting. Block size was 10 x 10 x 10 m for all Mineral Resources. Average rock densities were applied based on models of lithology. A total of 13,419 density measurements have been made on core samples in MPD-N. Bulk density averages 2.65 tonnes/m3 at Gate, 2.51 tonnes/m3 at Man, 2.57 tonnes/m3 at Dillard and 2.64 tonnes/m3 at Ketchan.
Block models were classified based on a calculated drill spacing. Blocks were assigned as an Inferred Mineral Resource where drilled at up to a 150 metre spacing. At Gate, where more drill information has allowed a higher degree of confidence in the geologic model, blocks at a drill spacing of up to 70 m have been classified as an Indicated Mineral Resource.
Reasonable prospects of eventual economic extraction (RPEEE) were established by JDS Energy & Mining Inc ("JDS") to constrain the MRE. To consider the RPEEE, JDS produced Lerchs-Grossmann optimized pit shells at each project area using the following parameters: Cu US
Quality Assurance and Quality Control procedures employed by Kodiak for the laboratory analysis of drill core included the inclusion of certified standards, blanks and duplicates. All Kodiak samples were sent to ALS Canada Ltd for analysis where the analytical procedures meet the requirements of International Standards ISO/IEC 17025:2005 and ISO 9001:2015. The historic results included in the Mineral Resources were reviewed and are believed to be from reliable sources using industry standards at the time, however the company has not independently verified, or cannot guarantee, the accuracy of historical information. The historical results will be summarized in the accompanying NI 43-101 technical report.
Qualified Person
The MRE was prepared by James Gray, P.Geo., of Advantage Geoservices Ltd., with contributions from Tysen Hantelmann, P.Eng., of JDS Energy & Mining Inc. for cut-off grade and Pit Shell optimization and Shane Tad Crowie, P.Eng., of JDS Energy & Mining Inc., for metallurgical parameters, in accordance with the 2014 Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards and Canadian National Instrument 43-101 ("NI 43-101"). James Gray, Tysen Hantelmann and Shane Tad Crowie, are independent Qualified Persons as defined by NI 43-101 and have reviewed and approved the contents of this news release. Dave Skelton, P.Geo. (AB), Vice President Exploration and a Qualified Person as defined by National Instrument 43-101, has approved and verified the technical information used in this news release. The historic work referenced herein is believed to be from reliable sources using industry standards at the time, based on Kodiak's review of available documentation. However, the Company has not independently validated all historic work, and the reader is cautioned about its accuracy.
On behalf of the Board of Directors
Kodiak Copper Corp.
Claudia Tornquist
President & CEO
For further information contact:
Nancy Curry, VP Corporate Development
ncurry@kodiakcoppercorp.com
+1 (604) 646-8362
About Kodiak Copper Corp.
Kodiak is focused on its
Kodiak's founder and Chairman is Chris Taylor who is well-known for his gold discovery success with Great Bear Resources. Kodiak is also part of Discovery Group led by John Robins, one of the most successful mining entrepreneurs in Canada.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Forward-Looking Statement (Safe Harbor Statement): This press release contains forward looking statements within the meaning of applicable securities laws. The use of any of the words "anticipate", "plan", "continue", "expect", "estimate", "objective", "may", "will", "project", "should", "predict", "potential" and similar expressions are intended to identify forward looking statements. In particular, this press release contains forward looking statements concerning the Company's exploration plans. Although the Company believes that the expectations and assumptions on which the forward-looking statements are based are reasonable, undue reliance should not be placed on the forward-looking statements because the Company cannot give any assurance that they will prove correct. Since forward looking statements address future events and conditions, they involve inherent assumptions, risks and uncertainties. Actual results could differ materially from those currently anticipated due to a number of assumptions, factors and risks. These assumptions and risks include, but are not limited to, assumptions and risks associated with conditions in the equity financing markets, and assumptions and risks regarding receipt of regulatory and shareholder approvals.
Management has provided the above summary of risks and assumptions related to forward looking statements in this press release in order to provide readers with a more comprehensive perspective on the Company's future operations. The Company's actual results, performance or achievement could differ materially from those expressed in, or implied by, these forward-looking statements and, accordingly, no assurance can be given that any of the events anticipated by the forward-looking statements will transpire or occur, or if any of them do so, what benefits the Company will derive from them. These forward-looking statements are made as of the date of this press release, and, other than as required by applicable securities laws, the Company disclaims any intent or obligation to update publicly any forward-looking statements, whether as a result of new information, future events or results or otherwise.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/256871
FAQ
What is the initial resource estimate for Kodiak Copper's (KDKCF) MPD project?
How many zones are included in KDKCF's initial mineral resource estimate?
What is the copper equivalent cut-off grade used in Kodiak's MPD resource estimate?
When will Kodiak Copper complete the full mineral resource estimate for MPD?
What are the next steps for Kodiak Copper's MPD project?