STOCK TITAN

Lion Copper Corp. Announces Filing of NI 43-101 Technical Report for Bear Deposit

Lion Copper files an NI 43-101 report confirming large Bear copper resources while the Yerington feasibility study advances toward a Q1 2027 target.

(Positive)
Tags

Lion Copper Corp. (LCGMD) has filed an independent NI 43-101 Technical Report supporting the maiden Mineral Resource Estimate for its Bear Deposit in the Yerington Copper District, Nevada, dated September 14, 2026 with an effective date of July 21, 2026.

The Bear MRE outlines an Indicated Resource of 6.71 billion pounds of contained copper (1,064 Mt at 0.29% Cu) and an Inferred Resource of 8.77 billion pounds of contained copper (1,770 Mt at 0.22% Cu), using a 0.1% Cu cut-off for sulfide material. The company notes that these Mineral Resources are not Mineral Reserves and do not demonstrate economic viability. Lion continues to advance the adjacent Yerington Copper Project through a Definitive Feasibility Study and permitting, with DFS completion targeted for Q1 2027.

Loading...
Loading translation...

Positive

  • Bear Indicated Resource: 6.71 billion lbs Cu (1,064 Mt at 0.29% Cu, 0.1% cut-off)
  • Bear Inferred Resource: 8.77 billion lbs Cu (1,770 Mt at 0.22% Cu, 0.1% cut-off)
  • Definitive Feasibility Study for Yerington Copper Project on schedule for Q1 2027

Negative

  • Bear Mineral Resources are not Mineral Reserves and lack demonstrated economic viability

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

Yerington, Nevada--(Newsfile Corp. - September 14, 2026) - Lion Copper Corp. (CSE: LCU) (OTCQB: LCGMD) ("Lion" or the "Company") is pleased to announce that it has filed the independent technical report supporting the maiden Mineral Resource Estimate ("MRE") for the Company's Bear Deposit, located within the Yerington Copper District in Lyon County, Nevada.

The technical report, titled "NI 43-101 Technical Report of the Bear Deposit" and dated September 14, 2026, with an effective date of July 21, 2026 (the "Technical Report"), was prepared in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") and supports the Bear MRE previously announced by the Company on August 4, 2026.

The Bear MRE establishes an Indicated Resource of 6.71 billion pounds of contained copper (1,064 Mt @ 0.29% Cu) and an Inferred Resource of 8.77 billion pounds of contained copper (1,770 Mt @ 0.22% Cu)., further demonstrating the scale and long-term development potential of the broader Yerington Copper District.

John Banning, Chief Executive Officer of Lion Copper Corp., commented:

"The filing of the Bear Technical Report represents another important milestone for Lion and provides the comprehensive technical basis supporting the maiden Mineral Resource Estimate announced in August. Bear has materially expanded the scale of our copper endowment and reinforces our view of the Yerington Copper District as one of the largest undeveloped copper districts in the United States.

Our immediate focus remains on disciplined execution at the Yerington Copper Project, where the Definitive Feasibility Study and permitting programs continue to advance. Over the longer term, Bear provides significant additional optionality immediately adjacent to Yerington and the potential to leverage the infrastructure being developed for the project."

Bear Mineral Resource Estimate

The maiden Bear MRE was previously announced by Lion on August 4, 2026. The Technical Report provides the supporting geological, drilling, estimation and technical information underlying the MRE, together with the assumptions and considerations used by the Qualified Persons in determining reasonable prospects for eventual economic extraction.

Table 1-1: Bear Deposit Mineral Resource Estimate

MaterialCut-off Grade
(Cu%)
Tonnes (Mt)Cu%Contained Cu
(000 Cu lbs)
Indicated Sulfide0.11,0640.296,710,000
Inferred Sulfide0.11,7700.228,770,000

 

The Company cautions that Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

Yerington Copper District

The Bear Deposit is contiguous with Lion's Yerington Copper Project and represents a significant component of the Company's broader district-scale copper strategy in Mason Valley, Nevada.

Lion is currently advancing the Yerington Copper Project through Definitive Feasibility Study and permitting, with completion of the DFS on schedule for Q1 2027. The Yerington Copper Project is planned to produce refined LME Grade A copper cathode for the domestic U.S. market.

The addition of Bear provides Lion with a substantial long-term copper resource base adjacent to the infrastructure contemplated for development at Yerington and creates significant optionality for future development across the district.

Technical Report Availability

The Technical Report is available under the Company's issuer profile on SEDAR+ and will also be available on the Company's website at LionCG.com.

Qualified Persons

The Qualified Persons (QPs), as that term is defined in NI 43-101, responsible for the preparation of the Report include:

  • Tim Maunula, P.Geo., Principal Geologist (AGP)
  • Michael McGlynn, SME-RM, QP, (Samuel Engineering)

Table 1-2: Bear Project Technical Report Qualified Persons and Areas of Responsibility

NameProfessional DesignationTitleResponsible for Sections
Mr. Tim MaunulaP.Geo.Principal Geologist,
AGP Mining Consultants Inc.
Sections 1-12,14-19
Mr. Michael McGlynnSME-RM, QPPrincipal Metallurgical Engineer,
Samuel Engineering
Section 13

 

The other scientific and technical information contained in this news release has been reviewed and approved by John Banning, MMSA QP, Chief Executive Officer of Lion and a Qualified Person as defined under NI 43-101.

About Lion Copper Corp.

Lion Copper Corp. is a North American copper development company advancing its flagship Yerington Copper Project and broader copper district in Lyon County, Nevada. The Company is advancing the Yerington Copper Project through Definitive Feasibility Study and permitting in partnership with Nuton, a Rio Tinto venture.

The Yerington Copper Project is planned to produce refined LME Grade A copper cathode for the domestic U.S. market.

On behalf of the Board of Directors,

John Banning
Chief Executive Officer
Lion Copper and Gold Corp.
(775) 463 9600
info@lioncg.com

(CSE: LCU) (OTCQB: LCGMD)

Forward-Looking Statements

This news release contains forward-looking statements and forward-looking information within the meaning of applicable Canadian securities laws and forward-looking statements within the meaning of applicable United States securities laws, including the safe harbor provisions of the United States Private Securities Litigation Reform Act of 1995. Forward-looking statements include, but are not limited to, statements regarding the Bear Deposit, the Mineral Resource Estimate, the potential upgrading or conversion of the Mineral Resource, future exploration, drilling, geological interpretation engineering, mine planning, technical studies, permitting, financing, property acquisitions, access rights, and the earn-in arrangement. Forward-looking statements are generally identifiable by words such as "may", "will", "expect", "intend", "plan", "believe", "anticipate", "estimate", "potential", "could", "should" and similar expressions, and are subject to known and unknown risks and uncertainties that may cause actual results to differ materially, including risks relating to mineral resource estimation, exploration results, technical studies, metal prices, permitting, financing, title, access and property rights, environmental and regulatory matters, and market conditions.

Forward-looking statements are based on assumptions that management believes to be reasonable as of the date of this news release, including assumptions regarding the accuracy of the Mineral Resource Estimate and supporting technical information, metal prices, recovery assumptions, operating and capital cost assumptions, availability of financing, regulatory and permitting timelines, access to lands and infrastructure, and the ability to obtain or maintain necessary property interests and authorizations.

Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause actual results, performance or achievements to differ materially from those expressed or implied. Such risks include, without limitation, uncertainty of Inferred Mineral Resources, inability to convert Mineral Resources to Mineral Reserves, commodity prices, metallurgical recoveries, capital and operating costs, availability of equipment, labor and services, permitting and environmental matters, title, surface rights and property access, financing availability, and general economic, political and industry conditions.

Readers are cautioned not to place undue reliance on forward-looking statements. The Company does not undertake to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by applicable securities laws.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/314120

FAQ

AI-generated questions and answers. How Rhea-AI works. Not financial advice.

What standards and dates govern the Bear Deposit Technical Report?

The Bear Deposit Technical Report is titled "NI 43-101 Technical Report of the Bear Deposit," prepared in accordance with NI 43-101 - Standards of Disclosure for Mineral Projects. It is dated September 14, 2026 and has an effective date of July 21, 2026.

What cut-off grade was used for the Bear Mineral Resource Estimate?

For the Bear Deposit MRE, a 0.1% Cu cut-off grade was applied to sulfide material for both the Indicated and Inferred resource categories.

How is the Bear Deposit positioned relative to the Yerington Copper Project?

The Bear Deposit is contiguous with Lion's Yerington Copper Project in Mason Valley, Nevada and is described as a significant component of the company’s broader district-scale copper strategy, providing a substantial long-term copper resource base adjacent to contemplated Yerington infrastructure.

Where can investors access the full Bear Deposit Technical Report?

The Technical Report is available under the company’s issuer profile on SEDAR+ and will also be available on Lion Copper Corp.'s website at LionCG.com.

Who are the Qualified Persons responsible for the Bear Technical Report and what are their roles?

Tim Maunula, P.Geo., Principal Geologist at AGP Mining Consultants, is responsible for Sections 1–12 and 14–19 of the report. Michael McGlynn, SME-RM, QP, Principal Metallurgical Engineer at Samuel Engineering, is responsible for Section 13. Other scientific and technical information in the news release was reviewed and approved by John Banning, MMSA QP, the company’s Chief Executive Officer.

What are Lion Copper Corp.'s broader development plans in the Yerington Copper District?

Lion Copper Corp. is advancing its flagship Yerington Copper Project through a Definitive Feasibility Study and permitting, in partnership with Nuton, a Rio Tinto venture. The project is planned to produce refined LME Grade A copper cathode for the domestic U.S. market, with the Bear Deposit adding long-term optionality and resource scale across the district.

Keep reading