Lithium South Environmental Impact Assessment
Rhea-AI Summary
Lithium South Development (OTCQB: LISMF) has received feedback from the Mining Secretariat of Salta Province, Argentina, regarding their Environmental Impact Assessment (EIA) for the Hombre Muerto North Lithium Project. The company is preparing a comprehensive response to obtain final approval, which is crucial for constructing a Pilot Plant for their planned Definitive Feasibility Study.
The response will include a Standard Penetration Test for camp site stability, hydrogeological verification with new monitoring protocols, enhanced mitigation plans, and community engagement initiatives. The company plans to submit the technical dossier within ten business days and will soon release a work plan for its Feasibility Study.
Positive
- Progress towards EIA approval for the HMN Li Project
- Comprehensive environmental and technical assessment approach
- 100% ownership of the Hombre Muerto North Lithium Project
- Planned implementation of enhanced monitoring and mitigation protocols
Negative
- Additional regulatory requirements before final EIA approval
- Potential delays in project timeline due to regulatory process
- Construction of Pilot Plant contingent on EIA approval
News Market Reaction 1 Alert
On the day this news was published, LISMF gained 3.23%, reflecting a moderate positive market reaction.
Data tracked by StockTitan Argus on the day of publication.
The E.I.A is an important part of the further development of the HMN Li Project as it will permit the construction of a Pilot Plant for a planned Definitive Feasibility Study. The response is being completed by Lithium South's multidisciplinary team of geotechnical, hydrogeology, environmental and community relations engineers and consultants. The work will include:
- Targeted Field Campaign: a Standard Penetration Test (SPT) will confirm camp site stability while providing key data for foundation design.
- Hydro-geological verification: fresh groundwater-level readings will be collected across the entire piezometer network, with new protocols for monthly monitoring to ensure continuous oversight of the salar's water balance.
- Data integration and rapid reporting: Field results will feed directly into an expanded hydro-geological model, updated impact matrices, and an enhanced mitigation plan that addresses soil integrity, surface stability, erosion control, and ecosystem safeguards.
- Community transparency: summary findings will be shared with local stakeholders, reinforcing the Company's commitment to open dialogue and socio-environmental responsibility.
- Formal submission within ten business days: the Secretariat will receive a comprehensive technical dossier, including QA/QC logs, trend analyses, and a proactive engagement schedule for ongoing compliance reviews.
Building on this regulatory momentum, Lithium South will release a concise work plan for its Feasibility Study in the near future, outlining the project's optimized flowsheet, updated resource model, and expanded ESG framework designed to fast-track value creation for shareholders and the Province of Salta.
"Every request from the Mining Secretariat is an opportunity to demonstrate the rigor of our environmental stewardship and the professionalism of our team. We are proud to deliver best-in-class technical responses on an accelerated schedule as we advance the
About Lithium South Development Corp.
Lithium South owns
On behalf of the Board of Directors
Adrian F. C. Hobkirk
President and Chief Executive Officer
Investors / Shareholders call 855-415-8100 / website: www.lithiumsouth.com
The contents of this press release and the scientific information contained herein was reviewed by Mr. William Feyerabend, a Consulting Geologist and a Qualified Person under N.I. 43-101. Mr. Feyerabend participated in the writing of this press release and approves the content.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. The TSX Venture Exchange has not reviewed the content of this news release and therefore does not accept responsibility or liability for the adequacy or accuracy of the contents of this news release.
Note 1: A report titled, Updated Mineral Resource Estimate – Hombre Muerto North Project, NI 43-101 Technical Report Catamarca and
Note 2: The report titled, N.I. 43-101 Preliminary Economic Assessment Hombre Muerto North Lithium Project,
This news release contains certain "forward-looking statements" within the meaning of Section 21E of the United States Securities and Exchange Act of 1934, as amended. Except for statements of historical fact relating to the Company, certain information contained herein constitutes forward-looking statements. Forward-looking statements are based upon opinions and estimates of management at the date the statements are made and are subject to a variety of risks and uncertainties and other factors which could cause actual results to differ materially from those projected in the forward-looking statements. The reader is cautioned not to place undue reliance on forward- looking statements. We seek safe harbor.
Logo: https://mma.prnewswire.com/media/1815015/5387198/Lithium_South_Development_Corporation_Logo.jpg
View original content to download multimedia:https://www.prnewswire.com/news-releases/lithium-south-environmental-impact-assessment-302490734.html
SOURCE Lithium South Development Corporation