LITHIUM SOUTH: TEST WORK/ DEVELOPMENT WORK /BUSINESS DEVELOPMENTS UPDATE
Rhea-AI Summary
Lithium South Development (TSX-V: LIS) (OTCQB: LISMF) has provided an update on its Hombre Muerto North Lithium Project in Argentina. Key developments include:
1. Successful laboratory-scale production of Lithium Iron Phosphate (LiFePO₄) directly from concentrated brine, with a basic button-type battery constructed using the product.
2. Ongoing evaporation test work at the project site for process validation.
3. Plans for a second phase pump test at the Alba Sabrina claim block, using two pumps to evaluate well capacity fully.
4. Ongoing discussions with automotive and lithium industry corporations for potential strategic alliances, including a planned bulk sample site visit in September.
The company is exploring options for producing higher-priced, value-added lithium products, with LiFePO₄ batteries gaining popularity in the EV and utility-scale stationary applications markets.
Positive
- Successful laboratory-scale production of Lithium Iron Phosphate (LiFePO₄) directly from concentrated brine
- Construction of a basic button-type battery using the HMN Li Project LiFePO₄ product
- Ongoing discussions with automotive and lithium industry corporations for potential strategic alliances
- Planned bulk sample site visit for an interested party in September
Negative
- Challenging market environment mentioned

Lithium Iron Phosphate Test Work
The Company is pleased to report the laboratory scale production of Lithium Iron Phosphate (LiFePO₄) directly from concentrated brine obtained from its Hombre Muerto North Lithium Project (HMN Li Project), located in Salta Province,
The laboratory (patent pending) process resulted in a LiFePO4 product directly from lithium chloride, eliminating the need for lithium carbonate. LiFePO4 batteries (LFP) are being utilized by Tesla, BYD and others due to their lower manufacturing costs, long cycle life and high-power density. LFP batteries are cobalt free and are finding increased demand in utility scale stationary applications in addition to the Electric Vehicle market. LFP demand is expected to rise considerably over the coming years
The LiFePO4 battery test work is important to Lithium South as it is helping to define potential options for the production of higher priced value-added lithium products. Evaporation test work is also continuing at the HMN Li Project site as part of the process validation for a planned Feasibility Study.
HMN Li Project Site
At the HMN Li Project Alba Sabrina claim block, a second phase pump test is being planned for well PW23-AS-02, a 400-meter-deep production well. With recent test work indicating a good pumping rate from a single pump, it has been determined that two pumps down the same hole will be necessary to provide additional brine lift and to fully evaluate the wells pumping capacity. The Company is in the process of acquiring two new pumps and support equipment to continue the test work. In addition, the Company plans to conduct new pumping tests on the Tramo and Natalia Maria claim blocks.
Business Discussions
Management is in ongoing discussions with several automotive and lithium industry corporations regarding potential strategic alliances or business arrangements. In spite of a challenging market environment, project interest remains high. These discussions include a bulk sample site visit planned for one interested party in September. Management remains on a trading blackout.
Mr. William Feyerabend, CPG, a Consulting Geologist and Qualified Person under NI 43-101, participated in the production of this news release and approves of the scientific and technical disclosure.
About Lithium South
Lithium South owns
On behalf of the Board of Directors
Adrian F. C. Hobkirk
President and Chief Executive Officer
Investors / Shareholders call 855-415-8100 / website: www.lithiumsouth.com
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. The TSX Venture Exchange has not reviewed the content of this news release and therefore does not accept responsibility or liability for the adequacy or accuracy of the contents of this news release.
Note 1: The Salta based laboratory is a non-arm's length party controlled by a director of the Company.
Note 2: A report titled Updated Mineral Resource Estimate – Hombre Muerto North Project, NI 43-101 Technical Report Catamarca and
This news release contains certain "forward-looking statements" within the meaning of Section 21E of the United States Securities and Exchange Act of 1934, as amended. Except for statements of historical fact relating to the Company, certain information contained herein constitutes forward-looking statements. Forward-looking statements are based upon opinions and estimates of management at the date the statements are made and are subject to a variety of risks and uncertainties and other factors which could cause actual results to differ materially from those projected in the forward-looking statements. The reader is cautioned not to place undue reliance on forward- looking statements. We seek safe harbor.
Logo: https://mma.prnewswire.com/media/1815015/Lithium_South_Development_Corporation_Logo.jpg
View original content:https://www.prnewswire.com/news-releases/lithium-south-test-work-development-work-business-developments-update-302217439.html
SOURCE Lithium South Development Corporation