InZinc Intersects 19.1 m grading 3.3% Zn, 0.7% Pb and 7.4 g/t Ag from 30 m downhole, including 8.5% Zn, 2.1% Pb and 21.3 g/t Ag over 2.0 m - Further Expanding Shallow Mineralization at Indy Sedex Project, Central BC
Rhea-AI Summary
InZinc Mining (TSXV: IZN) reported significant drilling results from its 100% owned Indy Sedex project in central British Columbia. The highlight intersection from drill hole IB25-032 yielded 3.3% Zn, 0.7% Pb and 7.4 g/t Ag over 19.1 meters from 29.9m downhole, including a high-grade zone of 8.5% Zn, 2.1% Pb and 21.3 g/t Ag over 2.0 meters.
The drilling program has successfully expanded the B-9 Zone mineralization to over 700 meters in length, discovering two shallow massive sulphide areas approximately 250 meters apart. The mineralization remains open for further exploration along trend and at depth. The project, located 90 km southeast of Prince George, covers 200 square km and includes 30 km of under-explored strata with favorable infrastructure access.
Positive
- Widest shallow intersection to date with 3.3% Zn, 0.7% Pb and 7.4 g/t Ag over 19.1m
- Successfully expanded B-9 mineralized trend to over 700m in length
- Discovery of two shallow massive sulphide areas with high-grade mineralization
- Project has excellent infrastructure with access to road, rail, power, port and smelter
Negative
- Some drill holes reported low core recoveries which could affect result reliability
- One drill hole (IB25-033) returned below cut-off grade mineralization
Vancouver, British Columbia--(Newsfile Corp. - August 21, 2025) - InZinc Mining Ltd. (TSXV: IZN) ("InZinc" or the "Company") is pleased to report an additional four drill holes from 2025 exploration diamond drilling at its
2025 Results - Highlights of B-9 Western Expansion Drilling (Table 1)
Drill Hole IB25-032 (Figure 1)
- Widest shallow intersection to date averaging
3.3% Zn,0.7% Pb and 7.4 g/t Ag over 19.1 m from 29.9 m downhole - Includes high grade zone averaging
8.5% Zn,2.1% Pb and 21.3 g/t Ag over 2.0 m from 31.0 m downhole - Intersection is located 30 m up-dip (west) of 2018 massive sulphide discovery (IB18-009, previously released) averaging
8.0% Zn,2.0% Pb, and 16.2 g/t Ag over 9.9 m from 78.1 m downhole - Results from a hole testing the down-dip projection are pending
B-9 Zone - Near Surface Trend Extension to 700 m (Figure 2)
- Four shallow drill holes IB25-030, IB25-031, IB25-032 and IB25-033 encountered mineralization at the principal horizon, expanding the western mineralization and increasing the B-9 trend to greater than 700 m in length
- Remains open for further exploration at depth and along trend
Table 1: B-9 West Trend Expansion - 2025 Diamond Drilling Intersections
| Drill Hole (HQ) | From (m) | To (m) | Interval (m) | Zinc (%) | Lead (%) | Silver (g/t) | Vertical Depth (m) |
| IB25-030 | 42.00 | 45.00 | 3.00 | 3.50 | 0.52 | 3.66 | 33 |
| IB25-031 | 25.66 | 30.00 | 4.34 | 2.43 | 0.39 | 4.27 | 18 |
| IB25-032 | 29.90 | 49.00 | 19.10 | 3.31 | 0.66 | 7.41 | 23 |
| includes | 31.00 | 33.00 | 2.00 | 8.48 | 2.09 | 21.28 | |
| and* | 40.00 | 49.00 | 9.00 | 3.96 | 0.67 | 7.39 | |
| IB25-033 | NCV | ||||||
| Vertical depth is measured from the top of the drill intersection - vertically to surface. True widths are estimated from | |||||||
Figure 1: B-9 Zone - Western Expansion
Hole IB25-032 Drill Hole Plan and Vertical Cross Section

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6480/263293_13afd510c4683904_0001full.jpg
Massive and Semi-Massive Sulphides in Two Areas
Drilling to date has discovered two shallow massive sulphide (high-grade) areas, 250 m apart, within a broader zone of the same stratigraphy but lesser grade mineralization. Both the southern and northern areas of massive sulphides remain open for expansion.
In the southern area, drill hole IB25-032 successfully targeted the near surface, western projection of massive sulphides discovered in 2018 drilling (hole IB18-009) and returned the thickest intercept of mineralization to-date, averaging
Figure 2: B-9 Zone - 2025 Exploration Drilling - Plan View
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6480/263293_13afd510c4683904_0002full.jpg
In the northern area, the Company also recently reported (see NR2025-04) a new shallow massive sulphide intersection. Drill hole IB25-029 (
B-9 Mineralized Zone Extended Up-dip (West) and Along Strike (North and South) - Now Traced for 700 m and Remains Open
Four shallow drill holes IB25-030, IB25-031, IB25-032 and IB25-033 encountered mineralization at the principal horizon, successfully expanding the up-dip (western) projection of the B-9 Zone. Including recently announced extensions to the north (see NR2025-04), the B-9 mineralized trend has been extended to over 700 m in length and remains open for further exploration along trend and at depth
Sedex District in Central BC
The extensive tenure at Indy covers 200 square km and a 30 km length of under-explored strata in central British Columbia. The Indy project is well located with respect to road, rail, power, port and smelter infrastructure.
The near surface mineralization (zinc-lead-silver and barite) discovered across the 7.5 km Main Trend at Indy (Figure 3) is typical of worldwide Sedex deposits and districts. These deposits often include significant silver and critical minerals as by-products.
Figure 3: Indy Project - Regional Location, Main Trend Mineralization and Targets

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6480/263293_13afd510c4683904_0003full.jpg
Table 2: B-9 North Extension - Previously Released 2025 Diamond Drilling Intersections
| Drill Hole (HQ) | From (m) | To (m) | Interval (m) | Zinc (%) | Lead (%) | Silver (g/t) | Vertical Depth (m) |
| IB25-029 | 61.00 | 64.00 | 3.00 | 10.98 | 2.25 | 27.05 | 45 |
| IB25-034 | 53.23 | 56.12 | 2.89 | 3.45 | 0.27 | 1.84 | 51 |
| IB25-035 | NCV | ||||||
| IB25-036 | 42.90 | 47.00 | 4.10 | 1.27 | 0.21 | 1.73 | 32 |
Table 3: B-9 ZONE - Summary of Previously Released Drill Results - 2018 and 2022
| Drill Hole (HQ) | From (m) | To (m) | Interval (m) | Zinc (%) | Lead (%) | Silver (g/t) | Vertical Depth Below Surface (m) | Estimated Core Recovery (%) |
| 2022 | ||||||||
| IB22-028 | 134.00 | 138.00 | 4.0 | 3.38 | 0.48 | 4.60 | 90 | 100 |
| IB22-025 | 116.00 | 119.00 | 3.00 | 2.77 | 0.61 | 3.78 | 80 | 100 |
| and | 134.25 | 137.80 | 3.55 | 3.53 | 0.61 | 6.41 | 93 | 100 |
| 2018 | ||||||||
| IB18-009 | 78.05 | 87.99 | 9.94 | 7.99 | 2.03 | 16.17 | 51 | 85 |
| IB18-008 | 55.79 | 62.52 | 6.73 | 5.76 | 0.48 | 3.41 | 56 | 90 |
| IB18-007 | 118.00 | 119.00 | 1.00 | 1.09 | 0.17 | 1.30 | 118 | 85 |
| IB18-006 | 49.97 | 53.96 | 3.99 | 3.88 | 1.34 | 8.91 | 29 | 75 |
| and | 104.27 | 105.79 | 1.52 | 2.96 | 0.42 | 2.32 | 63 | 100 |
| IB18-005 | 40.85 | 42.38 | 1.53 | 2.27 | 0.03 | 1.40 | 28 | 35 |
| and | 53.05 | 55.80 | 2.75 | 1.13 | 0.04 | 0.59 | 36 | 90 |
| IB18-004 | 22.26 | 23.75 | 1.49 | 2.06 | 0.48 | 3.60 | 23 | 43 |
| IB18-003* | 25.00 | 28.05 | 3.05 | 9.26 | 2.43 | 17.98 | 23 | 41 |
| IB18-002* | 35.96 | 40.24 | 4.28 | 4.49 | 1.13 | 7.32 | 25 | 37 |
| and | 41.77 | 47.15 | 5.38 | 2.24 | 0.83 | 5.23 | 30 | 40 |
| and | 49.39 | 53.96 | 4.57 | 3.50 | 0.66 | 4.59 | 36 | 65 |
| IB18-001 | 38.41 | 39.50 | 1.09 | 2.74 | 0.37 | 5.10 | 10 | 96 |
| Vertical depth is measured from the top of the drill intersection - vertically to surface. True widths are estimated from *Note: Low core recoveries. The intersections in IB18-002 are separated by lost core/no recovery. | ||||||||
About InZinc
InZinc is an active explorer at its Indy Sedex project (
| InZinc Mining Ltd. | ||
| Wayne Hubert | ||
| Chief Executive Officer | For further information contact : | |
| Phone: 604.687.7211 | Joyce Musial | |
| Website: www.inzincmining.com | Vice President, Corporate Affairs | |
| Phone: 604.317.2728 | ||
| Email: joyce@inzincmining.com | ||
Qualified Person
Patrick McLaughlin, P.Geo., an independent Qualified Person as defined in National Instrument 43-101 - Standards of Disclosure for Mineral Projects and a registered professional geoscientist in British Columbia, has approved the technical content of this news release.
Quality Assurance/Quality Control
HQ size drill core was collected from the drill site and delivered to the Indy Camp by InZinc staff. The core was logged, sample intervals were outlined and photographic records were collected. Core samples were split using a diamond saw or manually chipped at the camp with one-half of the core submitted for assay and the remainder stored in wooden core boxes. The core was bagged in individually marked plastic sample bags and shipments were compiled in labelled rice bags. Core shipments were delivered by InZinc contract geologists to Bandstra Transportation Systems Ltd. in Prince George, B.C. for furtherance to MSA Labs in Langley, B.C., Canada for analysis. Samples were prepared by MSA and analyzed by ICP-AES multi-element plus 4-Acid Digestion and select AAS-Fire Assay. In addition to the labs QA/QC procedures, InZinc inserted blind standards, blanks or lab-directed duplicates by special instruction - every tenth sample. The results from the QA/QC samples were within industry norms.
Cautionary Note Regarding Forward-Looking Statements
This news release contains forward-looking statements or forward-looking information within the meaning of applicable securities laws (collectively, "forward-looking statements"). All statements herein, other than statements of historical fact, are forward-looking statements. Forward-looking statements, include but are not limited to, statements that address activities, events of developments that the Company expects or anticipates will or may occur in the future. Forward-looking statements are typically identified by words such as: believe, expect, anticipates, intends, estimates, plans, postulate, indicate and similar expressions, or are those, which, by their nature, refer to future events. Although InZinc believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. The Company cautions investors that any forward-looking statements are not guarantees of future results, performance or actions, and that actual results or actions may differ materially from those in forward-looking statements as a result of various factors, including, but not limited to, those risks and uncertainties disclosed in the Company's Management's Discussion and Analysis for the year ended December 31, 2024 and for the three months ended March 31, 2025 filed with certain securities commissions in Canada and other information released by the Company and filed with the appropriate regulatory agencies. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, InZinc disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. All of the Company's Canadian public disclosure filings may be accessed via www.sedarplus.com.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/263293
