LUCA DRILLS 55.8 METRES OF 5.90 G/T AUEQ AT CAMPO MORADO - CONFIRMS NEAR-MINE HIGH-GRADE MINERALIZATION AND EXPANDS EXPLORATION PROGRAM
Rhea-AI Summary
Luca Mining (OTCQX: LUCMF) reported new Phase 2 surface and underground drill results at the Campo Morado VMS mine (Jan 12, 2026) that confirm wide, gold-rich mineralization near existing workings. Highlights include CMRF25-15: 55.8 m @ 5.90 g/t AuEq and CMRF25-13: 25.1 m @ 8.31 g/t AuEq. To date the program has completed 7,218 m of surface drilling and 8,440 m of underground drilling; a second surface rig was mobilized in December and additional drilling was added. Metallurgical samples were collected for updated recovery testing. Results support potential near-term conversion of exploration into mineable resources and possible increased precious-metal contribution to mill feed.
Positive
- Surface hole CMRF25-15: 55.8 m @ 5.90 g/t AuEq
- Surface hole CMRF25-13: 25.1 m @ 8.31 g/t AuEq
- Underground intercept CMUG-25-25 within ~60 m of workings: 4.0 m @ 1.04% Cu with associated Au/Ag
- 7,218 m surface and 8,440 m underground drilling completed to date
- Second surface drill rig mobilized to accelerate testing of high-priority targets
Negative
- Very low core recovery reported for CMRF-25-12: 19% recovery, which may affect assay confidence
- Assumed gold metallurgical recovery used in AuEq is 55%, limiting payable metal in calculations
- CMRF-25-16 returned no significant values, indicating mixed prospectivity across tested holes
News Market Reaction – LUCMF
On the day this news was published, LUCMF gained 9.91%, reflecting a notable positive market reaction.
Data tracked by StockTitan Argus on the day of publication.
Highlights
- Continued success defining wide, high-grade, gold-rich VMS mineralization at the Reforma Deposit and in areas immediately adjacent to active underground workings at
Campo Morado - Surface drillhole CMRF25-13 intersected 25.1 metres ("m") of 8.31 g/t AuEq**, including 4.9 m of 11.32 g/t AuEq
- Surface drillhole CMRF25-15 returned 55.8 m of 5.90 g/t AuEq, including 7.7 m of 10.09 g/t AuEq
- Underground drillhole CMUG-25-25 intersected 4.0 m of
1.04% Cu from a previously unmined zone within ~60 m of existing underground workings - Gold- and silver-enriched VMS mineralization shown to be higher grade and more extensive than historically modeled
- Second surface drill rig mobilized to test undrilled high-priority VMS targets across the
Campo Morado camp - 7,218 m of surface drilling and 8,440 m of underground drilling completed to date
- Metallurgical samples from
Reforma and El Rey collected for updated recovery testing
The latest drilling at the Reforma Deposit and adjacent near-mine targets confirms robust, gold-rich VMS mineralization, laterally extensive and positioned close to existing underground development. This combination supports the potential for near-term conversion of exploration success into mineable resources, increased precious-metal contribution to mill feed, and incremental mine-life extension with limited new infrastructure requirements
Reforma Deposit – Surface Drilling
Surface drillholes CMRF25-12 through CMRF25-16 were collared within and around the Reforma Deposit and intersected significant intervals of massive sulphide mineralization, including:
- CMRF25-13:
- 25.1 m of 8.31 g/t AuEq, including 4.9 m of 11.32 g/t Au
- CMRF25-15:
- 55.8 m of 5.90 g/t AuEq, including 7.7 m of 10.09 g/t AuEq, with strong copper and zinc
- CMRF25-12:
- 9.1 m of 7.11 g/t AuEq, highlighting high precious-metal enrichment
- CMRF25-14:
- Multiple zinc-rich massive sulphide intervals, including 3.3 m of 4.29 g/t AuEq
These holes were drilled across the central and eastern portions of the Reforma Deposit to confirm grade continuity, improve geological definition, and test expansion potential beyond historical interpretations.
Near-Mine Underground Drilling
Underground drillholes CMUG-25-25 and CMUG-25-26 targeted extensions of the C752 and C108 mineralized bodies, both currently under mine development, successfully intersectingmineralization from previously unmined areas, including:
- CMUG-25-25:
- 4.0 m of
1.04% Cu, with associated gold and silver, from a zone located within approximately 60 m of existing underground workings
- 4.0 m of
These intersections highlight opportunities to add mineable resources proximal to current development headings and existing infrastructure.
Exploration Program Expansion Highlights
- A second surface drill rig was mobilized in December to test previously undrilled, high-priority VMS targets across the
Campo Morado camp - 7,218 m of surface drilling completed across
Reforma , El Rey and a new previously undrilled target - Reforma Deeps - 8,440 m of underground drilling completed to date as part of the 10,000-metre Phase 1 and Phase 2 near-mine expansion program
- Metallurgical samples from
Reforma and El Rey collected for recovery testing
Drilling continues at
Paul D. Gray, Luca´s VP of Exploration, commented,
"These results confirm that
Table 1: Highlighted Diamond Drill Assay Results from UG Drillholes CMUG-25-25 and CMUG-25-26 through and Surface Drillholes CMRF25-12 through CMRF25-16.
Hole ID | From | To | Interval* | Au g/t | Ag g/t | Cu % | Pb % | Zn% | AuEq** g/t | Core recovery (%) |
CMUG-25-25 | 130.0 | 134.0 | 4.0 | 0.15 | 32.80 | 1.04 | 0.09 | 0.02 | - | 100 |
263.3 | 267.3 | 4.0 | 0.15 | 9.99 | 0.17 | 0.02 | 1.01 | - | 100 | |
270.5 | 271.2 | 0.7 | 0.37 | 140.10 | 0.03 | 0.13 | 0.30 | - | 100 | |
CMUG-25-26 | 111.8 | 142.2 | 30.4 | 0.34 | 26.17 | 0.17 | 0.25 | 0.07 | - | 98 |
Including | ||||||||||
113.0 | 118.9 | 5.9 | 0.43 | 70.57 | 0.17 | 0.44 | 0.03 | - | 92 | |
And | ||||||||||
120.6 | 125.5 | 4.9 | 0.18 | 22.57 | 0.37 | 0.30 | 0.07 | - | 98 | |
157.7 | 159.3 | 1.6 | 0.09 | 11.60 | 0.43 | 0.06 | 0.21 | - | 100 | |
CMRF-25-12 | 200.4 | 209.5 | 9.1 | 3.29 | 236.46 | 0.02 | 0.34 | 0.08 | 7.11 | 19 |
CMRF-25-13 | 152.0 | 177.1 | 25.1 | 3.19 | 150.11 | 0.61 | 1.00 | 3.32 | 8.31 | 100 |
Including | ||||||||||
154.7 | 177.1 | 22.4 | 3.50 | 162.58 | 0.66 | 1.09 | 3.58 | 9.03 | 100 | |
Including | ||||||||||
157.7 | 161.4 | 3.7 | 4.53 | 242.21 | 0.68 | 1.87 | 4.06 | 11.78 | 100 | |
And | ||||||||||
172.2 | 177.1 | 4.9 | 4.68 | 206.86 | 0.62 | 1.49 | 4.37 | 11.32 | 100 | |
CMRF-25-14 | 202.2 | 243.8 | 41.6 | 0.25 | 26.07 | 0.39 | 0.38 | 3.31 | 2.92 | 97 |
Including | ||||||||||
203.3 | 210.4 | 7.1 | 0.04 | 23.74 | 0.54 | 0.09 | 1.26 | 1.88 | 100 | |
And | ||||||||||
210.4 | 215.7 | 5.4 | 0.12 | 22.97 | 0.41 | 0.15 | 1.50 | 1.86 | 99 | |
And | ||||||||||
216.8 | 243.8 | 27.1 | 0.34 | 27.94 | 0.35 | 0.52 | 4.42 | 3.53 | 96 | |
Including | ||||||||||
223.0 | 226.3 | 3.3 | 0.99 | 26.89 | 0.39 | 0.24 | 4.74 | 4.29 | 100 | |
And | ||||||||||
235.8 | 238.0 | 2.2 | 0.72 | 42.53 | 0.38 | 1.42 | 6.80 | 5.56 | 97 | |
CMRF-25-15 | 172.0 | 227.8 | 55.8 | 1.21 | 53.24 | 1.30 | 0.48 | 3.58 | 5.90 | 98 |
Including | ||||||||||
172.0 | 191.7 | 19.7 | 0.87 | 29.42 | 2.55 | 0.14 | 0.62 | 5.69 | 93 | |
Including | ||||||||||
175.0 | 182.7 | 7.7 | 1.29 | 48.58 | 4.90 | 0.05 | 0.64 | 10.09 | 100 | |
And | ||||||||||
191.7 | 202.0 | 10.4 | 0.19 | 8.82 | 0.70 | 0.02 | 0.64 | 1.73 | 99 | |
Including | ||||||||||
202.0 | 227.8 | 25.8 | 1.88 | 89.28 | 0.59 | 0.92 | 7.03 | 7.73 | 97 | |
And | ||||||||||
217.0 | 227.2 | 10.2 | 2.09 | 116.67 | 0.49 | 1.48 | 10.14 | 9.82 | 97 | |
CMRF-25-16 | No Significant Values | |||||||||
*True widths are estimated to be > |
** The AuEq calculation is: AuEq = Au +(Ag*0.0124) + (Cu%*1.2787) + (Pb%*0.2740) + (Zn%*0.3653), at |
Figures 1 through 7 present cross-sections of the assay results from this latest batch of exploration drillhole results.
To date, 36 underground diamond drillholes totaling 8,440 metres are complete at the
In addition, 7,218 metres have been drilled from 26 surface drillholes at the
Based on the strength of surface drilling results to date, Luca has added a second drill rig and an additional 10,000 metres to the exploration campaign (see Company News Release dated November 12, 2025).
Table 2: Underground and Surface Drill Collar Details for Released Results
Hole ID | UTM WGS84 Z14 | Elevation (m) | Azimuth | Dip | Final Depth (m) | |
Easting | Northing | |||||
CMUG-25-25 | 379198 | 2010784 | 1,098 | 100 | -75 | 301.0 |
CMUG-25-26 | 379197 | 2010784 | 1,098 | 142 | -77 | 325.0 |
CMRF-25-12 | 380136 | 2013440 | 1,567 | 300 | -72 | 252.5 |
CMRF-25-13 | 380136 | 2013435 | 1,567 | 031 | -60 | 199.3 |
CMRF-25-14 | 380247 | 2013181 | 1,525 | 050 | -65 | 260.5 |
CMRF-25-15 | 380171 | 2013312 | 1,594 | 040 | -49 | 248.2 |
CMRF-25-16 | 380086 | 2013217 | 1,612 | 051 | -76 | 375.6 |
About the 2025 Campo Morado Surface Exploration Program
Luca's inaugural surface drill program is running in parallel with the ongoing underground exploration program at
These deposits host mineral resources (see Company News Release dated April 8, 2025) that have not been assessed in over 14 years.
A total of thirty-eight (38) priority targets are identified across the
Gold–Silver Endowment at
Of particular interest at the
Luca believes that the precious-metal endowment of the
About 2025 Campo Morado Underground Exploration Program
The current
The Company initially planned 5,000 metres of underground diamond drilling from approximately 25 drillholes during the first phase of exploration activities. The primary objectives of this program are to define additional mineral resources within under-drilled zones proximal to existing underground production areas and to test previously untested areas with potential to host extensions of known mineralization. An additional 5,000 metres was added to the underground drilling program in late 2025, and Luca expects exploration efforts to continue to ramp up in 2026 in parallel with underground production activities.
Previous exploration at
The company will provide additional updates as drilling advances at
Analytical Method and Quality Assurance/Quality Control Measures
All drill core splits reported in this news release were analysed by Bureau Veritas of
Qualified Person
The technical information contained in this news release has been reviewed and approved by Mr. Paul D. Gray, P.Geo., Vice-President Exploration at Luca Mining. Mr. Gray is a Qualified Person for the Company as defined by National Instrument 43-101.
About Luca Mining Corp.
Luca Mining Corp. (TSX-V: LUCA, OTCQX: LUCMF, Frankfurt: Z68) is a Canadian mining company with two wholly owned mines located in the prolific Sierra Madre mineralized belt in
The Company's Campo Morado Mine hosts VMS-style, polymetallic mineralization within a large land package comprising 121 square kilometres. It is an underground operation, producing zinc, copper, gold, silver and lead. The mine is located in Guerrero State.
The Tahuehueto Mine is a large property of over 100 square kilometres in Durango State. The project hosts epithermal gold and silver vein-style mineralization. Tahuehueto is a newly constructed underground mining operation producing primarily gold and silver. Luca has successfully commissioned its mill and is now in commercial production at Tahuehueto.
On Behalf of the Board of Directors
(signed) "Dan Barnholden"
Dan Barnholden, Chief Executive Officer
For more information, please visit: www.lucamining.com
Cautionary Note Regarding Forward-Looking Statements
Statements contained in this news release that are not historical facts are "forward-looking information" or "forward-looking statements" (collectively, "Forward-Looking Information") within the meaning of applicable Canadian securities laws. Forward Looking Information includes, but is not limited to, estimated production guidelines for 2025 and other possible events, conditions or performance that are based on assumptions about the proposed exploration program and its anticipated results; the timing and costs of future activities on the Company's properties, such as production rates and increases and sustaining capital expenditures; success of exploration, development, and metres to be drilled in exploration on the Tahuehueto Mine site and the Campo Morado Mine site. In certain cases, Forward-Looking Information can be identified using words and phrases such as "plans"," expects", "scheduled", "estimates", "forecasts", "intends", "anticipates" or variations of such words and phrases. In preparing the Forward-Looking Information in this news release, the Company has applied several material assumptions, including, but not limited to, that the Company will be able to raise additional capital as necessary; the current exploration, development, environmental and other objectives concerning the Tahuehueto Mine can be achieved; that consistent and sustainable mill feed at Campo Morado Mine will be achieved; the continuity of the price of gold and other metals and economic and political conditions. Forward-Looking Information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the Forward-Looking Information. There can be no assurance that Forward-Looking Information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on Forward-Looking Information. Except as required by law, the Company does not assume any obligation to release publicly any revisions to Forward-Looking Information contained in this news release to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
View original content to download multimedia:https://www.prnewswire.com/news-releases/luca-drills-55-8-metres-of-5-90-gt-aueq-at-campo-morado---confirms-near-mine-high-grade-mineralization-and-expands-exploration-program-302658235.html
SOURCE Luca Mining Corp.
FAQ
What were the headline drill results for Luca Mining (OTCQX: LUCMF) at Campo Morado on Jan 12, 2026?
How much drilling has Luca completed at Campo Morado in the Phase 2 program for LUCMF?
Does the new drilling at Campo Morado for LUCMF include near-mine mineralization that can be added to mine plans?
What metallurgical recovery assumptions were used in the AuEq calculation for LUCMF results?
Has Luca increased drilling capacity at Campo Morado after these results for LUCMF?
Are all released drill holes high grade for LUCMF at Campo Morado?







