Mayfair Gold Files Technical Report for Fenn-Gib Gold Project
Rhea-AI Summary
Mayfair Gold (OTCQX:MFGCF) filed an NI 43-101 technical report and pre-feasibility study for the Fenn-Gib Gold Project in the Timmins Gold District, Northeastern Ontario.
The report, titled "Fenn-Gib Project: NI 43-101 Technical Report and Pre-Feasibility Study," was prepared by Ausenco Engineering Canada ULC and is available under the company's profile on SEDAR+. The filing date is announced January 15, 2026.
Separately, as of January 14, 2026, Richard Klue is moving to semi-retirement: he will transition from a full-time VP Technical Services role to an hourly advisory arrangement while exploring non-executive board opportunities and other projects.
Positive
- None.
Negative
- None.
This technical report was prepared by Ausenco Engineering Canada ULC.
Semi-Retirement of VP Technical Services
As of January 14, 2026, Richard Klue having successfully contributed to the preparation and completion of the Fenn-Gib Pre-Feasibility Study he has decided to move toward semi-retirement and, rather than continuing in traditional full-time role, plans to remain active by assisting Mayfair Gold Corp. on an hourly basis, while also exploring non-executive board opportunities and other turnaround projects. Mayfair would like to thank Richard for his contributions and leadership in advancing the Fenn-Gib project to this stage as he moves into much deserved semi-retirement.
About Mayfair Gold
Mayfair Gold is a Canadian mineral exploration company focused on advancing the
Cautionary Notes to U.S. Investors Concerning Resource Estimates
This news release has been prepared in accordance with the requirements of the securities laws in effect in
Cautionary Note Regarding Forward Looking Information
This news release contains forward-looking information which reflects management's expectations regarding the Company's growth, results of operations, performance and business prospects and opportunities. Forward-looking information in this news release includes, but is not limited to, statements regarding the design, development and execution of the Project, the PFS demonstrating the strong economics and free cash flow potential associated with developing the Project as a targeted, high-grade operation that can be advanced through the
Forward-looking information is based on various reasonable assumptions including, without limitation, the expectations and beliefs of management; the assumed long-term price of gold; that the Company can access financing, appropriate equipment and sufficient labour; and that the political environment where the Company operates will continue to support the development and operation of mining projects. Should underlying assumptions prove incorrect, or one or more of the risks and uncertainties described below materialize, actual results may vary materially from those described in forward-looking statements.
Forward-looking information is subject to a variety of risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking information, including, without limitation, risks and uncertainties relating to foreign currency fluctuations; risks inherent in mining including environmental hazards, industrial accidents, unusual or unexpected geological formations, ground control problems and flooding; delays or the inability to obtain necessary governmental permits or financing; risks associated with the estimation of mineral resources and reserves and the geology, grade and continuity of mineral deposits; the possibility that future exploration, development or mining results will not be consistent with the Company's expectations; the potential for and effects of labor disputes or other unanticipated difficulties with or shortages of labor; failure of plant, equipment or processes to operate as anticipated; actual ore mined varying from estimates of grade, tonnage, dilution and metallurgical and other characteristics; the inherent uncertainty of production and cost estimates and the potential for unexpected costs and expenses, gold price fluctuations; uncertain political and economic environments; and changes in laws or policies.
The Company undertakes no obligation to publicly update or review the forward-looking information whether as a result of new information, future events or otherwise, other than as required under applicable securities laws. The forward-looking information reflect management's beliefs, opinions and projections as of the date of this news release.
Neither the TSX Venture Exchange ("TSXV") nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this news release.
View original content to download multimedia:https://www.prnewswire.com/news-releases/mayfair-gold-files-technical-report-for-fenn-gib-gold-project-302663013.html
SOURCE Mayfair Gold Corp.