STOCK TITAN

Notifications

Limited Time Offer! Get Platinum at the Gold price until January 31, 2026!

Sign up now and unlock all premium features at an incredible discount.

Read more on the Pricing page

RETRANSMISSION: Millennial Potash Reports Significant Increase In Resource Estimates: Measured + Indicated Resource is up by 275% and Inferred Resource is increased by 210% at its Flagship Banio Potash Project: Measured + Indicated Mineral Resources of 2.45 Billion Tonnes at 15.6% KCl and Inferred Mineral Resources of 3.56 Billion Tonnes at 15.6% KCl

Rhea-AI Impact
(No impact)
Rhea-AI Sentiment
(Neutral)
Tags

Millennial Potash (OTCQB: MLPNF) announced an updated Mineral Resource Estimate (Effective Date: Nov 11, 2025) for the northern Banio Potash Project prepared by ERCOSPLAN. The MRE reports Measured + Indicated mineral resources of 2.45 billion tonnes at ~15.61% KCl and Inferred mineral resources of 3.56 billion tonnes at ~15.61% KCl. Measured resources include a maiden 648.19M tonnes at 15.72% KCl. The company said contained KCl equals ~382.7M tonnes in M+I and ~555.4M tonnes in Inferred. The Feasibility Study for the North Target is supported by a non-dilutive US$3M DFC contribution.

Millennial Potash (OTCQB: MLPNF) ha annunciato una stima aggiornata delle risorse minerarie (Data effettiva: 11 novembre 2025) per il progetto potassico Banio settentrionale, preparata da ERCOSPLAN. L'MRE riporta risorse minerarie misurate + indicate di 2,45 miliardi di tonnellate a ~15,61% KCl e risorse minerarie inferite di 3,56 miliardi di tonnellate a ~15,61% KCl. Le risorse misurate includono una prima 648,19M di tonnellate a 15,72% KCl. L'azienda ha dichiarato che il KCl contenuto è pari a ~382,7M tonnellate in M+I e ~555,4M tonnellate in inferite. Lo Studio di Fattibilità per l'obiettivo nord è supportato da una contribuzione non diluitiva di US$3M DFC.

Millennial Potash (OTCQB: MLPNF) anunció una estimación actualizada de Recursos Minerales (Fecha efectiva: 11 de noviembre de 2025) para el North Banio Potash Project preparado por ERCOSPLAN. La MRE reporta recursos minerales medidos + indicados de 2,45 mil millones de toneladas a ~15,61% KCl y recursos minerales inferidos de 3,56 mil millones de toneladas a ~15,61% KCl. Los recursos medidos incluyen una primera 648,19M toneladas a 15,72% KCl. La compañía dijo que el KCl contenido equivale a ~382,7M toneladas en M+I y ~555,4M toneladas en Inferidos. El Estudio de Factibilidad para el North Target está respaldado por una contribución no dilutiva de US$3M DFC.

Millennial Potash (OTCQB: MLPNF)은 ERCOSPLAN이 준비한 북부 Banio 포타시 프로젝트에 대한 업데이트된 광물 자원 추정치(MRE, 유효일: 2025년 11월 11일)를 발표했다. MRE는 측정 + 표시 자원 2.45십억 톤, ~15.61% KCl추정 자원 3.56십억 톤, ~15.61% KCl을 보고한다. 측정 자원에는 최초의 648.19백만 톤, 15.72% KCl이 포함된다. 회사는 포함된 KCl이 M+I에서 ~382.7백만 톤, 추정에서 ~555.4백만 톤이라고 밝혔다. 북부 타깃에 대한 타당성 연구는 비 희석형 US$3M DFC 기여로 지원된다.

Millennial Potash (OTCQB: MLPNF) a annoncé une estimation révisée des ressources minérales (Date effective: 11 novembre 2025) pour le projet potassique Banio nord préparée par ERCOSPLAN. Le MRE indique des ressources minérales Mesurées + Indiquées de 2,45 milliards de tonnes à ~15,61% KCl et des ressources minérales Inférées de 3,56 milliards de tonnes à ~15,61% KCl. Les ressources Mesurées incluent une première 648,19 M de tonnes à 15,72% KCl. La société a déclaré que le KCl contenu équivaut à ~382,7 M tonnes en M+I et ~555,4 M tonnes en Inférées. L’étude de faisabilité pour la cible nord est soutenue par une contribution non dilutive de US$3M DFC.

Millennial Potash (OTCQB: MLPNF) gab eine aktualisierte Mineralressourcenschätzung (Gültigkeitsdatum: 11. November 2025) für das nördliche Banio Kaliumprojekt, erstellt von ERCOSPLAN. Die MRE meldet gemessene + indikierte Mineralressourcen von 2,45 Milliarden Tonnen bei ca. 15,61% KCl und inferred Ressourcen von 3,56 Milliarden Tonnen bei ca. 15,61% KCl. Zu den gemessenen Ressourcen gehört eine Erstmeldung 648,19 Mio. Tonnen bei 15,72% KCl. Das Unternehmen gab an, dass enthaltener KCl ca. 382,7 Mio. Tonnen in M+I und ca. 555,4 Mio. Tonnen in Inferred beträgt. Die Machbarkeitsstudie für das North Target wird durch einen nicht-dilutiven Beitrag von US$3 Mio DFC unterstützt.

Millennial Potash (OTCQB: MLPNF) أعلن عن تقدير معدّلات الموارد المعدنية المحدث (تاريخ السريان: 11 نوفمبر 2025) للمشروع شمال بانيو بوتاش تحت إشراف ERCOSPLAN. يذكر MRE الموارد المعدنية المقاسة + المعلَمة بمقدار 2.45 مليار طن عند ~15.61% KCl و< b> الموارد المعدنية المستدلّة بمقدار 3.56 مليار طن عند ~15.61% KCl. الموارد المقاسة تتضمن 648.19 مليون طن عند 15.72% KCl. قالت الشركة إن المحتوى من KCl يساوي ~382.7 مليون طن في M+I و ~555.4 مليون طن في المستدلّة. دراسة الجدوى للهدف الشمالي مدعومة بمساهمة غير مخفّضة بقيمة 3 ملايين دولار أمريكي DFC.

Positive
  • Measured+Indicated 2.452B tonnes at 15.61% KCl
  • Measured maiden 648.19M tonnes at 15.72% KCl
  • M+I increased ~275% and Inferred increased ~210% since 2024
  • Non-dilutive US$3M DFC funding for North-target Feasibility Study
Negative
  • Mineral resources are not mineral reserves; no demonstrated economic viability
  • MRE tonnages are in-situ with no recovery or process recoveries applied
  • Feasibility Study will focus only on the North Target

West Vancouver, British Columbia--(Newsfile Corp. - November 17, 2025) - Millennial Potash Corp. (TSXV: MLP) (OTCQB: MLPNF) (FSE: X0D) ("MLP", "Millennial" or the "Company") is pleased to announce the results of an updated Mineral Resource Estimate ("MRE") for the northern part of its Banio Potash Project in Gabon. The MRE has an Effective Date of Nov. 11, 2025 and was completed by ERCOSPLAN Ingenieurgesellschaft Geotechnik und Bergbau mbH ("ERCOSPLAN"), one of the oldest and best-known potash specialist consulting companies in the world with significant experience in the West African Potash Basin.

Table 1 Measured, Indicated and Inferred Mineral Resources, Banio Potash Project

2025 MRE
CLASSIFICATION
TONNAGE (MT)KCL (%)MRE INCREASE (%)
FROM 2024*




MEASURED648.1915.72--




INDICATED1804.5415.57~ 175%




M+I2,452.7315.61~ 275%




INFERRED3,559.4915.61~ 210%
*see MLP Press Release dated Jan.16,2024

 

Farhad Abasov, Millennial's Chair, commented, "Millennial Potash is delighted to report that its updated Mineral Resource Estimates (MRE) for the northern part of its Banio Potash Project has exceeded all our expectations marking a major milestone in our development. Last year we had no Measured Resource, whereas now we have 648M tonnes of maiden Measured Resource. The total Measured and Indicated Resource increased by 275% while the Inferred Resource went up by 210%. The increase in resources since our maiden resource in 2024 has been massive with Carnallitite Measured + Indicated resources of 2.42B tonnes at 15.5-% KCl and additional Inferred Carnallitite resources of 3.6B tonnes also grading 15.4% KCl.

This vast increase in the resources calculated may also allow us to consider substantially expanding any planned production scale in the future. The newly calculated resources underscore the project's immense potential, as it covers only about 5% of the entire project area. The presence of sylvinite seams constitute a higher-grade resource that adds further promise to the Project.

It is important to note that the resources cover only a fraction of the northern part of the entire Project area and based on historical drill results and seismic work we believe the Project deposit continues both to the south and to the north. With significant thicknesses of potash mineralization encountered in all drillholes to date, locally in excess of 100m, we see support for our interpretation that these potash seams have thickness, grade and continuity making them potentially highly suitable to solution mining.

Moving forward this MRE is expected to provide a solid base for a Feasibility Study ("FS") which is being supported by the U.S. International Development Finance Corp. ("DFC") by a non-dilutive USD $3M in funding. The FS will investigate various possible production scenarios via solution mining."

The MRE includes Measured Carnallitite Mineral Resources of approximately 648 million tonnes grading 15.7% KCl, Indicated Carnallitite Mineral Resources of approximately 1.769 billion tonnes grading 15.4% KCl, Indicated Sylvinite Mineral Resources of 35 million tonnes grading 24.3% KCl, Inferred Carnallitite Mineral Resources of 3.463 billion tonnes grading 15.4% KCl, and Inferred Sylvinite Mineral Resources of 96.2 million tonnes grading 24.2% KCl (see Tables 1,3,4,5). The MRE includes analytical results from the 2024 MRE for holes BA-002 and BA-003, plus 2025 drilling results from the extension of BA-001 (BA-001-EXT), and new hole BA-004. (see MLP Press releases dated Sept. 16, 2025 and Oct. 14, 2025).

The 2025 MRE values equate to approximately 102 million tonnes of contained KCl in the Measured category, about 281 million tonnes of contained KCl in the Indicated category and approximately 555 million tonnes of contained KCl in the Inferred category (see Tables 3, 4 and 5) In addition, compared to 2024 MRE, MLP has added a large maiden Measured Mineral Resource of 648 million tonnes at 15.7% KCl (see MLP Press release dated Jan. 16, 2024).

The Banio Potash Project is located at the north end of the West-African Evaporite Basin. This is a well-established potash basin. The Mineral Resource Estimate for MLP's Banio Potash Project is comprised of Measured, Indicated and Inferred resources based on the definition of potash-bearing seams or beds in numerous sedimentary evaporite cycles or stages that were identified from drill core collected from potash specific exploration drillholes. The Mineral Resources are comprised of carnallitite and sylvinite resources as detailed in Tables 3, 4 and 5.

Geological Model

The geological model of Banio Potash mineralization identifies 7 potash-bearing Evaporite Cycles (CII to CVIII) with up to 20 seams of carnallitite and 3 seams of sylvinite in individual Cycles. For the potash seams to be considered as potentially suitable for solution mining, which is deemed to be the optimal mining method to sustain a low-cost economic operation at Banio, they must meet certain thickness and grade criteria. In order to be considered as potentially mineable via solution mining the following cut-off parameters were applied to on the carnallitite and sylvinite seams:

  • Carnallitite: seam thickness has to be > 2.5 m when single, and > 1.25 m when other seams are present within 5 m vertical distance, and Carnallite content > 47 % (~ 12.5% KCl).

  • Sylvinite: seam thickness has to be > 2 m and the Sylvite content > 16 %. Combined Sylvite/Carnallite seams (e.g., Cycle VIII seam 4 in Ba-003, Cycle VII seam 14 in Ba-002) have been considered as separate seams.

The seams which meet these criteria are outlined in Table 2 below.

The flat-lying nature of the West African Evaporite Basin, confirmed in the project area by results from extensive seismic studies coupled with drillhole geological information, allows for extrapolation of the various cycles and seams over significant distances. The evaporite basin geology outlined in the stratigraphic columns in Figure 1 confirms continuity of potash seams over approximately 8,000m of strike length based on drill holes BA-001, BA-002, BA-003, and BA-004

Resource Estimate

In calculating the mineral resource tonnages, the following procedures were completed (Mineral Resources are given as in-situ mineralization):

  • Around each drill hole, a Radius of Influence (ROI) was defined and by intersection of these ROIs, polygons around drill holes where constructed.

  • Each polygon was clipped by the coast of Banio Lagoon and restricted to only onshore areas within the Mayumba Permit. The volume for each potash seam was calculated by multiplying the clipped polygon area with the thickness of the potash seam.

  • The carnallitite tonnage was calculated by multiplying the volume assigned to each seam with a carnallitite tonnage factor (density). The density for each seam was determined individually from the relative abundance of the salt minerals in the carnallitite seam and varies from between 1.77 g/cm³ for high grade carnallitite and 1.80 g/cm³ for low grade carnallitite seams. For Sylvinite seams, a sylvinite tonnage factor was similarly determined. Based on Sylvite grade, density varied between 2.07 g/cm³ and 2.13 g/cm³.

  • The KCl grade of each seam was calculated from a weighted average grade of drillholes sample results collected from the individual seams.

The MRE classifies the carnallitite mineralization as Measured, Indicated and Inferred Mineral Resources, and the and sylvinite mineralization as Indicated and Inferred, as defined by NI 43-101. This reflects the level of confidence in the extent and grade of both the carnallitite and sylvinite bodies.

The criteria used in the MRE to define the extension of mineralization from each drillhole for the Measured, Indicated and Inferred carnallitite resources is as follows:

  • Measured Mineral Resources occur within a radius of 700m of a drill hole, as long as the seismic survey results show no significant change in thickness of the overall salt section. The ROI for Indicated Mineral Resources is not extended beyond the position of faults interpreted from the seismic survey sections.

  • Indicated Mineral Resources occur within a radius of 1,400m of a drill hole, minus the Measured Resources as long as the seismic survey results show no significant change.

Table 2 Composite carnallitite and sylvinite seam data from drillholes utilized in the MRE.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/4674/274692_8c3de51974abaab0_002.jpg

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4674/274692_8c3de51974abaab0_002full.jpg

ND no data, as the cycle has not been preserved in this drill hole (BA-001 Cycle VIII) or has not been drilled Cycle II to Cycle IV in Ba-003

LT/LG thickness or grade do just not meet the criteria

X = mineralization may be present, but thickness and grade far off from meeting criteria

Sg = slightly different grouping of seams between drill holes

Blank-empty in Cycle VI and Cycle VII due to seams being either Ct or Sy in different drill holes

Cannot view this image? Visit: https://images.newsfilecorp.com/files/4674/274692_8c3de51974abaab0_003.jpg

Fig. 1 Correlation of potash cycles displaying good continuity from BA-002, BA-003, BA-001 and BA-004 drillholes.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4674/274692_8c3de51974abaab0_003full.jpg

  • in thickness of the overall salt section. The ROI for Indicated Mineral Resources is not extended beyond the position of faults interpreted from the seismic survey sections.

  • Inferred Mineral Resources occur within a radius of 2,800m of a drillhole, minus the Measured and Indicated resources within this area. Considering that for Inferred Mineral Resources the continuity of grade and thickness only have to be implied, the ROI for this category is predicted to extend into the fault bounded downthrown block that has been interpreted from the seismic sections.

Similarly, the MRE utilizes the following criteria to estimate the extension of the Indicated and Inferred sylvinite resources from a drillhole:

  • Measured Mineral Resources for sylvinite have not been assigned due to the uncertainly in the extent of the sylvinite deposition as it is primarily a secondary form of mineralization and structurally controlled.

  • Indicated Mineral Resources occur within a radius of 500m of a drill hole, as long as the seismic survey results show no significant change in thickness of the overall salt section.

  • Inferred Mineral Resources occur within a radius of 1,000m of a drill hole, minus the Indicated resources within this area.

Since the extent of the Sylvite mineralization is secondary and mainly structurally controlled, the ROIs for the sylvinite mineralization are not extended beyond faults interpreted from the seismic survey sections.

The ROI distribution for carnallitite seams in Cycles VI to VII showing the Indicated resource ROI clipped at interpreted faults and the Inferred ROI extending beyond these same faults is shown in Figure 2.

Cycles VI and VII in BA-001 display anomalous thickness which may be a local feature related to proximity to a NE-SW trending fault and localized folding. ERCOSPLAN has interpreted the substantial thicknesses of Cycles VI and VII to be local features and in order to be conservative in the resource estimate, have calculated True Thicknesses for all the seams in these two cycles through structural analysis and comparisons to adjacent, unaffected drillhole stratigraphy. Minor uncertainty remains regarding the exact position of this fault and consequently a 200 m wide barrier with no Mineral Resources is defined along the interpreted fault. Uncertainty around additional faults interpreted from the seismic sections are accommodated by a non-resource zone 100m wide associated with each potential fault.

The resulting Measured, Indicated and Inferred mineral resources for the Banio Project are presented in Tables 3, 4 and 5. The robust carnallitite Measured Mineral Resource Estimate of 648M tonnes grading 15.7% KCl, and carnallitite Indicated Mineral Resource Estimate of 1.77 billion tonnes grading 15.4% KCl provide a solid base for continuing exploration and development at the project and for the initiation of a Feasibility Study. The FS the Company plans to complete will focus only on the North Target although significant potential for potash mineralization is interpreted from downhole geophysical studies completed in several oil and gas wells at the South Target of the permit area.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/4674/274692_8c3de51974abaab0_004.jpg

Figure 2 Measured, Indicated and Inferred ROI Polygons for Carnallitite Seams in Cycles VI to VII with interpreted faults zones

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4674/274692_8c3de51974abaab0_004full.jpg

In addition to carnallitite resources, the sylvinite mineralization, with Indicated Mineral Resources of approximately 35.2M tonnes grading 24.3% KCl and Inferred Mineral Resources of approximately 96.2M tonnes at 24.3% KCl, represent attractive exploration targets with higher grades that may enhance the overall grade of the project.

Table 3: Measured Mineral Resources*

DRILLHOLEAREA (km2)THICKNESS
(m)
MINERALOGYTONNAGE (MT)GRADE % KClTONNAGE (MT KCl)







BA-0011.2616.32Carnallitite37.0015.415.70
BA-0021.3772.83Carnallitite179.7715.3327.55
BA-0031.5370.14Carnallitite191.8516.0630.82
BA-0041.5486.82Carnallitite239.5615.7937.82














MEASUREDTOTAL
Carnallitite648.1915.72101.89

 

Table 4: Indicated Mineral Resources*

DRILLHOLEAREA (km2)THICKNESS
(m)
MINERALOGYTONNAGE (MT)GRADE % KClTONNAGE (MT KCl)







BA-0013.9568.41Carnallitite487.2714.4470.37
BA-0020.794.8Sylvinite7.9924.911.99
BA-0022.5772.83Carnallitite336.5415.3651.69
BA-0030.797.46Sylvinite12.4719.452.43
BA-0032.8570.14Carnallitite358.3916.0657.55
BA-0040.799.03Sylvinite14.6928.004.11
BA-0043.7787.89Carnallitite587.18.15.7992.70














INDICATEDTOTAL
Carnallitite1,769.3915.39272.31



Sylvinite35.1524.268.53







TOTALINDICATED
CT+SYL1,804.5415.56280.84







MEASURED + INDICATED
Carnallitite 2,417.5815.48374.20



Sylvinite35.1524.268.53







TOTAL M + I
CT+SYL2,452.7315.61382.73

 

Table 5: Inferred Mineral Resources*

DRILLHOLEAREA (km2)THICKNESS (m)MINERALOGYTONNAGE (MT)GRADE % KClTONNAGE (MT KCl)







BA-0018.1068.41Carnallitite998.1714.56145.32
BA-0021.564.80Sylvinite15.8824.913.96
BA-0025.1572.83Carnallitite673.8915.43103.96
BA-0032.367.46Sylvinite37.4119.457.28
BA-0032.6270.14Carnallitite329.8116.0452.90
BA-0044.524.58Sylvinite42.8628.0012.00
BA-0049.3887.89Carnallitite1,461.4715.74230.03







INFERREDTOTAL
Carnallitite3,463.3415.37532.20



Sylvinite96.1524.1623.23
TOTAL INFERRED

3,559.4915.61555.43

 

*Cautionary Notes:

  1. MT=Million Tonnes, tonnage is for in-situ resource with no discount for recovery as mining and processing methods are to be finalized. Potash deposits have been mined by underground, open pit and solution mining methods.

  2. The numbers for tonnage, average KCl per cent are rounded figures

  3. Mineral resources that are not mineral reserves do not have demonstrated economic viability. The estimates of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues.

  4. The quantity and grade of reported Inferred resources in this estimation are uncertain in nature and there has been insufficient exploration to define these Inferred resources as an Indicated or Measured mineral resource and it is uncertain if further exploration will result in upgrading them to an Indicated or Measured mineral resource category.

  5. Densities used in resource calculations are 2.07-2.13 g/cm3 for Sylvinite and 1.77-1.80 g/cm3 for Carnallitite

The Company is required to file an NI 43-101 compliant technical report on SEDAR within 45 days of the initial disclosure of the MRE made herein.

The information in this news release has been reviewed and approved by Sebastiaan van der Klauw, EurGeol, of ERCOSPLAN and Peter J. MacLean, Ph.D., P. Geo, Director of the Company, and both are Qualified Persons as that term is defined in National Instrument 43-101.

To find out more about Millennial Potash Corp. please contact Investor Relations at (604) 662-8184 or email at info@millennialpotash.com.

Keep up-to-date on Millennial Potash developments and join our online communities on: Twitter, Facebook, LinkedIn, Instagram and YouTube.

MILLENNIAL POTASH CORP.

"Farhad Abasov"
Chair of the Board of Directors

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This document may contain certain "Forward-Looking Statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. When used in this news release, the words "anticipate", "believe", "estimate", "expect", "target, "plan" or "planned", "forecast", "intend", "may", "schedule" and similar words or expressions identify forward-looking statements or information. These forward-looking statements or information may relate to future prices of commodities, accuracy of mineral or resource exploration activity, reserves or resources, regulatory or government requirements or approvals including approvals of title and mining rights or licenses and environmental (including land or water use), local community or indigenous community approvals, the reliability of third party information, continued access to mineral properties or infrastructure, changes in laws, rules and regulations in Gabon or any other jurisdiction which may impact upon the Company or its properties or the commercial exploitation of those properties, currency risks including the exchange rate of USD$ for Cdn$ or CFA or other currencies, fluctuations in the market for potash or potash related products, changes in exploration costs and government royalties, export policies or taxes in Gabon or any other jurisdiction and other factors or information. The Company's current plans, expectations and intentions with respect to development of its business and of the Banio Potash Project may be impacted by economic uncertainties arising out of any pandemic or by the impact of current financial and other market conditions on its ability to secure further financing or funding of the Banio Potash Project. Such statements represent the Company's current views with respect to future events and are necessarily based upon a number of assumptions and estimates that, while considered reasonable by the Company, are inherently subject to significant business, economic, competitive, political, environmental and social risks, contingencies and uncertainties. Many factors, both known and unknown, could cause results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements. The Company does not intend, and does not assume any obligation, to update these forward-looking statements or information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements and information other than as required by applicable laws, rules and regulations.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/274692

FAQ

What did Millennial Potash (MLPNF) report on Nov 11, 2025 for Banio?

An updated MRE with M+I 2.45 billion tonnes at ~15.61% KCl and Inferred 3.56 billion tonnes at ~15.61% KCl.

How much measured resource did MLPNF report at Banio in 2025?

A maiden Measured resource of 648.19 million tonnes grading 15.72% KCl.

How large were the resource increases reported by MLPNF vs 2024?

The company reported M+I increased ~275% and Inferred increased ~210% since 2024.

How much contained KCl did the 2025 MRE report for M+I and Inferred?

Approximately 382.7 million tonnes KCl in M+I and 555.4 million tonnes KCl in Inferred.

Who prepared the 2025 Banio MRE and what is the effective date?

The MRE was prepared by ERCOSPLAN with an effective date of Nov 11, 2025.

Will Millennial Potash fund a Feasibility Study for Banio and what scope?

Yes; the North-target Feasibility Study is supported by a non-dilutive US$3M contribution from DFC.
Millennial Potash Corp

OTC:MLPNF

MLPNF Rankings

MLPNF Latest News

MLPNF Stock Data

192.77M
70.44M
34.02%
0.29%
Other Industrial Metals & Mining
Basic Materials
Link
Canada
Vancouver