Mongolian Mining (MOGLF) has released its operational update for Q1 2025. The company, Mongolia's largest internationally listed private mining company, reported mixed results in its coking coal operations. Run-of-mine (ROM) coal mining output reached 3,673.4 thousand tonnes, showing a 3% year-over-year increase but remained flat quarter-on-quarter.

The company processed 3,749.5 kt of ROM coking coal, producing 2,110.0 kt of washed coking coal products (2% YoY decrease, 1% QoQ increase). Total sales reached 1,600.4 kt, comprising 1,079.4 kt of washed hard coking coal, 72.2 kt of washed semi-soft coking coal, and 448.7 kt of washed mid-ash semi-hard coking coal.

In gold operations, the company's 50% owned Bayan Khundii gold mine is 86.5% complete in construction, with production expected to commence in H2 2025. Additionally, MOGLF acquired a 50.5% stake in Universal Copper on March 11, 2025, expanding into copper and non-ferrous metals exploration.

Loading...
Loading translation...

Positive

  • ROM coal mining output increased 3% YoY to 3,673.4 kt
  • Bayan Khundii gold mine construction at 86.5% completion
  • Strategic expansion into copper through Universal Copper acquisition

Negative

  • Washed coking coal production decreased 2% YoY
  • Total coking coal sales declined 15% QoQ and 3% YoY
  • Processing volume decreased 5% QoQ

(Incorporated in the Cayman Islands with limited liability)
(Stock Code: 975)

HONG KONG, April 16, 2025 (GLOBE NEWSWIRE) -- The board of directors (the “Board”) of Mongolian Mining Corporation (the “Company”, together with its subsidiaries, collectively the “Group”) wishes to announce the unaudited operational update for the quarter ended 31 March 2025. The comparative figures for the quarter ended 31 March 2024 and the quarter ended 31 December 2024 are also disclosed in this announcement (if and as applicable).

The Company is the largest internationally listed private mining company with operations focused on and located in Mongolia. The Group has consolidated a diversified business portfolio to develop and operate coking (metallurgical) coal, gold, copper, and other non-ferrous metals mining assets in southern and western regions of Mongolia.

Coking (metallurgical) coal operations

Energy Resources LLC (“ER”), the Group’s wholly-owned subsidiary, operates Ukhaa Khudag (“UHG”) coking coal mine and Khangad Exploration LLC (“KEX”), the Group’s majority-owned subsidiary, operates Baruun Naran (“BN”) coking coal mine, both located in Umnugobi aimag (province), Mongolia. The Group is the largest producer and exporter of washed coking coal products in Mongolia.

During the quarter ended 31 March 2025, the Group’s run-of-mine (“ROM”) coal mining combined output from UHG and BN mines was 3,673.4 thousand tonnes (“kt”), representing 3% year-on-year (“YoY”) increase and remains unchanged on quarter-on-quarter (“QoQ”) basis as compared to the corresponding periods ended 31 March 2024 and 31 December 2024, respectively.

The Group processed a total of 3,749.5 kt of ROM coking coal to produce 2,110.0 kt of washed coking coal products, representing 2% YoY decrease compared to the corresponding period ended 31 March 2024 and 1% QoQ increase compared to the previous quarter ended 31 December 2024.

The Group’s operating subsidiaries ER and KEX sold a total of 1,600.4 kt of washed coking coal products in the first quarter of 2025, whilst washed coking coal product mix supplied by the Group to its customers was as follows: (i) 1,079.4 kt of washed hard coking coal; (ii) 72.2 kt of washed semi-soft coking coal; and (iii) 448.7 kt of washed mid-ash semi-hard coking coal. This represents 3% YoY decrease compared to the corresponding period of 2024 and 15% QoQ decrease compared to the previous quarter ended 31 December 2024.

The main operational data for coking (metallurgical) coal operations summarised and shown below in Table 1 are all rounded and derived from the internal records of the Group and are intended to give investors an overview of the Group’s operations in a timely manner and may differ from the data disclosed in periodic reports of the Company.

Table 1. Main operational data for the quarter ended 31 March 2025:

  The quarter
ended
31 March
The quarter
ended
31 March
YoY
change
The quarter
ended
31 December
QoQ
change
ItemUnit20252024(%)2024(%)
       
ROM coal minedkt3,673.43,563.7+3%3,684.50%
ROM coking coal processedkt3,749.53,694.6+1%3,947.8-5%
Washed coking coal producedkt2,110.02,161.7-2%2,085.6+1%
Washed coking coal soldkt1,600.41,650.3-3%1,886.1-15%
       

Gold and metals operations

The Group is 50% equity holder of Erdene Mongol LLC (“EM”), which is currently developing Bayan Khundii (“BKH”) gold mine located in Bayankhongor aimag (province), Mongolia, and gold production is expected to commence in the second half of 2025.

The Group has continued with project development to advance construction work at the BKH mine, which has an expected life of mine total production of 476 thousand ounces (“Koz”) of recovered gold according to the updated feasibility study prepared in 2023 in accordance with NI 43-101 reporting standards.

During the quarter ended 31 March 2025, EM continued to advance construction work for gold processing plant and site support facilities, including power, heat and water supply infrastructure, laboratory, warehouse, chemicals and blasting materials storages, office and accommodation camp. The construction work progress reached around 86.5% by the end of the first quarter of 2025 according to the project development schedule. The commissioning process is expected to start within the second quarter of 2025.

On 11 December 2024, the Company and Mongolian Mining Corporation Pte. Ltd (a wholly owned subsidiary of the Company), entered into an agreement to purchase 50.5% of the issued and outstanding share capital of Universal Copper LLC (“UCC”), a company engaged in the exploration of copper and other non-ferrous metals and holds minerals exploitation special permits located in Bayankhongor aimag (province), Mongolia. Subsequently, upon closing on 11 March 2025, UCC became a subsidiary of the Company.

Important notice

The aforesaid operational data are not an express or implied forecast or guarantee in respect of the Company’s future operating conditions.

In addition, various factors may affect results, including (but not limited to) force majeure events, changes in market conditions and regulatory interferences, as such material differences may exist in the operational data published from quarter to quarter.

Investors should note that undue reliance on or use of the above information may cause investment risks.

For and on behalf of the Board
Mongolian Mining Corporation
Odjargal Jambaljamts

Chairman

As at the date of this announcement, the board of directors of the Company consists of Mr. Odjargal Jambaljamts and Dr. Battsengel Gotov, being the executive directors of the Company, Mr. Od Jambaljamts, Ms. Enkhtuvshin Gombo and Mr. Myagmarjav Ganbyamba, being the non-executive directors of the Company, and Dr. Khashchuluun Chuluundorj, Mr. Unenbat Jigjid, Mr. Chan Tze Ching, Ignatius, Ms. Delgerjargal Bayanjargal and Dr. Tsend-Ayush Tuvshintur, being the independent non-executive directors of the Company.

Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement.



Enquiries:

Strategic Financial Relations Limited

Cindy Lung
+852 2864 4867
cindy.lung@sprg.com.hk

Rachel Ko
+852 2114 2370
rachel.ko@sprg.com.hk

Carlos Chen
+852 2864 4847
carlos.chen@sprg.com.hk

FAQ

What was MOGLF's coking coal production volume in Q1 2025?

MOGLF produced 2,110.0 thousand tonnes of washed coking coal products in Q1 2025, showing a 2% year-over-year decrease but a 1% quarter-on-quarter increase.

When will MOGLF's Bayan Khundii gold mine start production?

The Bayan Khundii gold mine is expected to commence production in the second half of 2025, with construction currently at 86.5% completion.

What is the expected total gold production from MOGLF's Bayan Khundii mine?

According to the 2023 feasibility study (NI 43-101 standards), the Bayan Khundii mine has an expected life of mine total production of 476 thousand ounces of recovered gold.

How did MOGLF's coking coal sales perform in Q1 2025 compared to previous periods?

MOGLF's Q1 2025 coking coal sales of 1,600.4 kt showed a 3% decrease year-over-year and a 15% decrease quarter-on-quarter.

What recent acquisition did MOGLF complete in Q1 2025?

MOGLF acquired a 50.5% stake in Universal Copper on March 11, 2025, expanding into copper and non-ferrous metals exploration in Mongolia.
Mongolian Mining