STOCK TITAN

NexMetals Intersects 10.50 Metres of Sulphide Mineralization at Selebi Main in Drill Hole SMD-26-209, Expanding the Flexure Zone

(Positive)
Tags

NexMetals (TSXV: NEXM / NASDAQ: NEXM) reports visual intercepts from drill hole SMD-26-209 at Selebi Main, intersecting a 10.50 metre zone of blebby, stringer and massive sulphides from 1,768.65m to 1,779.15m, including 3.05m and 5.95m massive sulphide intervals.

Hole SMD-26-209 (1,861.9m) lies ~350m from prior hole SMD-25-205 and supports expansion of the emerging Flexure Zone; assays are pending and will be reported when validated. Surface program totals 19,130 metres to date.

Loading...
Loading translation...

Positive

  • 10.50m sulphide intercept at 1,768.65–1,779.15m
  • 3.05m and 5.95m massive sulphide intervals within intercept
  • Step-out mineralization ~350m from SMD-25-205 supports continuity
  • Surface drill program totaling 19,130 metres to date

Negative

  • Assays are pending; visual results lack confirmed grades
  • Economic significance remains unknown until assay validation is complete

News Market Reaction – NEXM

-3.40%
-3.40% Session close to close

In the Mar 26 session, NEXM declined 3.40%, reflecting a moderate negative market reaction.

Data tracked by StockTitan Argus on the day of publication.

Market Context

This announcement highlights a 10.50 m sulphide interval in SMD-26-209 at the Selebi Main Flexure Zo...
Analysis

This announcement highlights a 10.50 m sulphide interval in SMD-26-209 at the Selebi Main Flexure Zone, adding to earlier high‑grade results such as 11.05 m at 7.31% CuEq in SMD‑25‑205. Together with 19,130 m drilled in the surface program, it reinforces a potentially extensive system beyond the 2024 resource. Investors may track forthcoming assays, updated resource estimates, and progress on economic studies to assess how these intercepts translate into project outcomes.

Key Figures

Mineralized interval: 10.50 metres Massive sulphides interval 1: 3.05 metres Massive sulphides interval 2: 5.95 metres +5 more
8 metrics
Mineralized interval 10.50 metres Sulphide mineralization in drill hole SMD-26-209
Massive sulphides interval 1 3.05 metres First massive sulphide interval within SMD-26-209
Massive sulphides interval 2 5.95 metres Second massive sulphide interval within SMD-26-209
Reference intercept 11.05 metres of 7.31% CuEq SMD-25-205 intercept cited for comparison
Hole length SMD-26-209 1,861.9 metres Total depth of drill hole SMD-26-209
Mineralized depth range 1,768.65–1,779.15 metres Depth of mineralized interval in SMD-26-209
Program drilling completed 19,130 metres Total drilling in 8 completed holes, 1 extension, 3 abandoned, 3 in-progress
Distance to SMD-25-205 350 metres UTM distance between SMD-26-209 and SMD-25-205

Historical Context

5 past events · Latest: Mar 19 (Positive)
Pattern 5 events
Date Event Sentiment 24h Move Catalyst
Mar 19 Selkirk resampling results Positive +1.2% Reported 180.8 m at 1.31% CuEq and planned updated MRE.
Mar 02 Flexure zone retransmission Positive -5.6% Re-transmitted high-grade 11.05 m at 7.31% CuEq at Selebi Main.
Feb 26 High-grade flexure discovery Positive +12.0% Announced 11.05 m of 7.31% CuEq in SMD‑25‑205 beyond MRE.
Feb 09 Board change announcement Neutral -0.3% CEO Sean Whiteford reappointed to board after resignation.
Feb 02 VP geology & equity grants Neutral -7.4% Appointed VP, Geology and granted RSUs and stock options.

24h Move is the share-price change in the day after each event; other market factors may also have contributed.

Pattern Detected

Drill and resource-related news often saw positive or mixed reactions, with one notable selloff on a high-grade flexure release, suggesting inconsistent trading responses to exploration updates.

Recent Company History

Over recent months, NexMetals has focused on advancing its Botswana assets. Key events include high‑grade intercepts at Selebi Main’s Flexure Zone on Feb 26 and a strong Selkirk resampling program reported on Mar 19, both tied to upcoming resource updates. Corporate developments included leadership changes and equity incentives. Reactions have varied, with some positive moves (up to +11.99%) and one sharp decline (-7.36%) despite neutral corporate actions, framing today’s Flexure Zone drilling as part of an ongoing growth narrative.

Key Terms

massive sulphides, chalcopyrite, borehole electromagnetic, ICP-AES, +3 more
7 terms
massive sulphides technical
"interval of blebby, stringer and massive sulphides, including:3.05 metres"
Massive sulphides are dense bodies of rock made mostly of sulphide minerals, which are compounds of sulfur and metals such as copper, zinc, lead, nickel or gold. Think of them as rich “clumps” of metal-containing material within host rock, like chunks of chocolate in a cookie; their size, concentration and depth determine whether they could be mined economically. For investors, they signal the potential for high-grade metal resources, but also carry exploration, processing and permitting risks.
chalcopyrite technical
"pyrrhotite-rich massive sulphides with visible chalcopyrite, along with magnetite"
Chalcopyrite is a common copper-bearing mineral (a copper-iron sulfide) that often looks brassy yellow and is the main source of mined copper worldwide. For investors, its presence and abundance in a rock deposit determine how much recoverable copper a mine can produce and how profitable extraction will be — think of chalcopyrite as the concentrated ingredient that makes an ore body valuable and worth developing.
borehole electromagnetic technical
"when integrated with ongoing borehole electromagnetic ("BHEM") targeting."
A borehole electromagnetic test is a geophysical technique that sends and measures electromagnetic signals from equipment placed in a drilled hole to map the electrical properties of the surrounding rock and fluids. For investors, it provides non‑destructive clues about where minerals, water or hydrocarbons might be located and how concentrated they are, reducing the guesswork and cost of further drilling much like an MRI gives a clearer picture before surgery.
ICP-AES technical
"peroxide fusion preparation and ICP-AES finish (ME-ICP81). Analyses for Pt, Pd,"
ICP-AES (Inductively Coupled Plasma–Atomic Emission Spectroscopy) is a laboratory technique that identifies and measures the amounts of metals and other elements in a sample by turning the sample into a hot glowing gas and reading the light colors it emits—like using a prism to tell which ingredients are present and how much. Investors care because it provides reliable, quantitative proof of metal content, contamination levels or product purity, which affects resource valuation, regulatory compliance and product quality across mining, manufacturing and environmental contexts.
fire assay technical
"Analyses for Pt, Pd, and Au are by fire assay (30 grams nominal"
Fire assay is a laboratory process used to accurately measure the amount of precious metals, like gold or silver, in a sample of ore or material. It involves heating the sample intensely to separate the metals from other substances, much like melting and purifying metal to determine its purity. This method is important to investors because it provides precise data on the metal content, helping to assess the value of mining operations or mineral deposits.
NI 43-101 regulatory
"presented in accordance with NI 43-101, which may not be identical"
A Canadian regulatory standard that sets the rules for how mining and exploration companies must report mineral resources and reserves, requiring technical reports prepared or signed off by an independent, certified expert. It matters to investors because it creates a consistent, transparent “inspection report” for mining projects, making it easier to compare prospects, judge the reliability of claims, and assess geological and financial risk before investing.
Regulation S-K regulatory
"purposes of National Instrument 43-101 and Subpart 1300 of Regulation S-K."
A set of U.S. Securities and Exchange Commission rules that tell public companies which narrative and qualitative details must be disclosed in filings, such as risk factors, management discussion, executive pay, legal proceedings and business description. Think of it as a standardized checklist or blueprint that ensures investors get the same types of background information from every company so they can compare risks, management quality and strategy before making investment decisions.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

Vancouver, British Columbia--(Newsfile Corp. - March 26, 2026) - NexMetals Mining Corp. (TSXV: NEXM) (NASDAQ: NEXM) ("NEXM" or the "Company") is pleased to report visual results from drill hole SMD-26-209, part of its ongoing surface drilling program targeting the emerging Flexure Zone ("Flexure Zone") at the Selebi Main deposit in Botswana (see Figure 1). Drill core photos from hole SMD-26-209 are presented in Figure 2. Drilling continues to intersect strong zones of sulphide mineralization outside of the 2024 Mineral Resource Estimate ("2024 MRE"), reinforcing the scale and continuity of the Selebi system.

Highlights:

What You Need to Know: Strong Visual Intercept from SMD-26-209

  • Drill hole SMD-26-209 intersected a 10.50 metre interval of blebby, stringer and massive sulphides, including:
    • 3.05 metres of massive sulphides; and
    • 5.95 metres of massive sulphides
  • Assays are pending and will be reported once received and validated.

What Does This Mean?

  • Visual results from SMD-26-209 are consistent with SMD-25-205 (11.05 metres of 7.31% CuEq, see news release dated February 26, 2026), located 350 meters to the northeast, demonstrating expansion potential within the Flexure Zone, extending down-dip and down-plunge from Selebi Main.
  • The presence of thick, continuous massive sulphide intervals in holes spaced more than 300 meters apart supports the Company's interpretation of a robust and laterally extensive mineralized system at Selebi Main.
  • The combination of massive, blebby and stringer sulphides indicate a strong sulphide system with potential for scale, particularly when integrated with ongoing borehole electromagnetic ("BHEM") targeting.

Sean Whiteford, CEO and Director of the Company, commented: "Hole SMD-26-209 continues to demonstrate thick intervals of massive sulphide mineralization beyond the current mineral resource footprint. Step-out drilling within the emerging Flexure Zone is not only highlighting expansion potential, but also validating our BHEM targeting, with mineralization consistently intersected where modeled. These results point to potential for increased thickness at depth, which could have positive implications for project economics. With several additional holes in progress targeting this zone, we look forward to further defining the extent and characteristics of the Flexure Zone. The visual results alone highlight the strength of the system, and we look forward to validating these observations with assays."

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7759/289999_e669a65f640178d7_002.jpg

Figure 1: Long section of Selebi Mines highlighting drill hole SMD-26-209 location relative to the 2024 MRE and the expansion of the Flexure Zone. The Inferred Resource reference in Figure 1 is presented in accordance with NI 43-101, which may not be identical to Inferred Resource references under SK-1300.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7759/289999_e669a65f640178d7_002full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7759/289999_e669a65f640178d7_003.jpg

Figure 2: SMD-26-209 Core photos.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7759/289999_e669a65f640178d7_003full.jpg

Detailed Drilling and BHEM Information

SMD-26-209 was completed to 1,861.9 metres and intersected a 10.5 metre interval of mineralization from 1,768.65 metres to 1,779.15 metres. The mineralized zone is comprised of blebby, stringer and massive sulphides and includes two intervals of massive sulphides with thicknesses of 3.05 metres and 5.95 metres. The mineralized interval is characterized by pyrrhotite-rich massive sulphides with visible chalcopyrite, along with magnetite and minor amphibolite inclusions.

SMD-26-209 is the most recent Selebi Main Expansion drillhole that defines the newly emerging "Flexure Zone". SMD-26-209 is located 350 metres UTM southwest of SMD-25-205 (11.05 metres of 7.31% CuEq, 3.00% Cu and 2.09% Ni) and 345 metres UTM northwest of SMD-26-208 that intersected three zones of sulphide mineralization (see news release dated February 26, 2026).

This Flexure Zone is located down-dip and down plunge of the 2024 MRE and was discovered by the follow-up of drilling and BHEM results in SMD-25-201 and subsequent drill holes. SMD-25-201 was the first hole that targeted large BHEM plates at the southernmost extent of the gap between the Selebi Main and Selebi North deposits (see news release dated February 26, 2026).

To date, a total of 19,130 metres in 8 completed holes, 1 hole extension, 3 abandoned holes and 3 in-progress holes have been completed as part of the surface drilling program. Drill hole collar details are provided in Table 1 below.

Table 1: 2026 Surface Drilling Collar Information

HOLE IDUTM EastUTM NorthElevationDipTrue North AzimuthHole Length
SMD-26-209582465.37563469.4908.0-74.5100.21861.9

 

Qualified Person

All scientific and technical information in this news release has been reviewed and approved by Sharon Taylor, V.P. Exploration of the Company, MSc, P.Geo, and a "qualified person" for the purposes of National Instrument 43-101 and Subpart 1300 of Regulation S-K.

Quality Control

The program is being executed using three company-owned underground Zinex U5 drills which were converted into surface A5 drills, and a Marcotte HTM2500 drill purchased by the Company capable of drilling to depths of 2,550 metres (NQ core).

Drill core samples are either NQ (47.75 mm diameter) or BQ (36.40 mm diameter). All samples are ½ core samples cut by a diamond saw on site and the remaining half of the core is retained for reference purposes. Samples are generally 1.0 to 1.5 metre intervals or less at the discretion of the site geologists. Sample preparation and lab analysis was completed at ALS Geochemistry in Johannesburg, South Africa. Commercially prepared Blank samples and certified Cu/Ni sulphide analytical control standards with a range of grades are inserted in every batch of 20 samples or a minimum of one set per sample batch. Analyses for Ni, Cu and Co are completed using a peroxide fusion preparation and ICP-AES finish (ME-ICP81). Analyses for Pt, Pd, and Au are by fire assay (30 grams nominal sample weight) with an ICP-AES finish (PGM-ICP23).

Holes are numbered as follows: SMD (Selebi Main Deposit) + year + hole number starting at 201.

BHEM Surveys

The BHEM surveys at Selebi utilize the Crone PEM system operated by local Botswana staff. Survey data is collected using a 3-component fluxgate probe collecting full waveform data. Surveys have been collected using timebases between 50 and 1000ms (0.25 Hz to 5 Hz). The data has been processed to a calculated residual step response to better quantify the conductive sources. This added processing has proven to be highly valuable because of the size of the highly conductive mineralized system.

Technical Report

The 2024 MRE on the Selebi Mines is supported by the technical report entitled "Technical Report, Selebi Mines, Central District, Republic of Botswana" dated September 20, 2024 (with an effective date of June 30, 2024) (the "Selebi Technical Report"), and the technical report summary entitled "S-K 1300 Technical Report Summary Selebi Mines, Central District, Republic of Botswana, Premium Resources Ltd." dated December 17, 2024 (with an effective date of June 30, 2024) (the "Selebi Technical Report Summary"), each prepared by SLR Consulting (Canada) Ltd. for NEXM. Reference should be made to the full text of the Selebi Technical Report, which was prepared in accordance with NI 43-101 and is available on SEDAR+ (www.sedarplus.ca) and the Selebi Technical Report Summary, which was prepared in accordance with Subpart 1300 of Regulation S-K and is available in the Company's Annual Report on Form 10-K for the fiscal year ended December 31, 2025 filed with the U.S. Securities and Exchange Commission (the "SEC") on EDGAR (www.sec.gov), in each case, under NEXM's issuer profile.

About NexMetals Mining Corp.

NexMetals Mining Corp. is a TSX.V and NASDAQ listed mineral exploration and development company focused on redeveloping the past-producing Selebi and Selkirk copper-nickel-cobalt-platinum group element mines in Botswana. NexMetals has confirmed the scale of mineralization is larger than historical estimates, supported by NI 43-101- and Regulation S-K 1300-compliant resource estimates, with ongoing down-hole geophysics, drilling, and metallurgical programs aimed at expanding resources and supporting future economic studies. The Company is led by an experienced management and technical team with a proven track record in global mineral projects, emphasizing disciplined execution, transparent governance, and long-term stakeholder value creation.

For further information about NexMetals Mining Corp., please contact:

Sean Whiteford
CEO and Director
info@nexmetalsmining.com

1-833-770-4334

Follow Us

X: https://x.com/NexMetalsCorp
LinkedIn: https://www.linkedin.com/company/NexMetalsMiningCorp
Facebook: https://www.facebook.com/NexMetalsMiningCorp

Neither the TSX Venture Exchange and its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) nor the Nasdaq Stock Market LLC accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

Cautionary Note Regarding Forward-Looking Statements

This news release contains "forward-looking statements" within the meaning of the United States federal securities laws and "forward-looking information" within the meaning of applicable securities legislation (collectively, "forward-looking information") based on expectations, estimates and projections as at the date of this news release. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. For the purposes of this release, forward looking information includes, but is not limited to, the Company reporting assay results for Drill hole SMD-26-209 when they become available and the anticipated results; the expected scale and continuity of the Selebi system; the Company's interpretation of a robust and laterally extensive mineralized system at Selebi Main; the Company's belief in a strong sulphide system with potential for scale; and the expansion potential within the Flexure Zone which could have positive implications for project economics. These forward-looking statements, by their nature, require the Company to make certain assumptions and necessarily involve known and unknown risks and uncertainties that could cause actual results to differ materially from those expressed or implied in these forward-looking statements. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, capital and operating costs varying significantly from estimates; the preliminary nature of drilling and metallurgical test results; metallurgical results differing from the Company's estimates; the ability of exploration results to predict mineralization; the ability of the Company to implement its drilling, geoscience and metallurgical work on its properties and work plans generally; prefeasibility or the feasibility of mine production; delays in obtaining or failures to obtain required governmental, environmental or other project approvals; uncertainties relating to the availability and costs of financing needed in the future; changes in equity markets; inflation; fluctuations in commodity prices; delays in the development of projects; the other risks involved in the mineral exploration and development industry; and those risks set out in the Company's filings with the U.S. SEC on EDGAR (www.sec.gov) and public disclosure record on SEDAR+ (www.sedarplus.ca), in each case, under NEXM's issuer profile. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/289999

FAQ

What did NexMetals announce about drill hole SMD-26-209 on March 26, 2026 (NEXM)?

The company reported a 10.50 metre visual sulphide intercept in SMD-26-209 with two massive sulphide intervals. According to the company, the interval lies from 1,768.65m to 1,779.15m and assays are pending for grade confirmation.

How does the SMD-26-209 result affect the Selebi Flexure Zone potential for NEXM?

SMD-26-209 supports expansion of the Flexure Zone, indicating lateral continuity and scale. According to the company, the hole lies ~350m from prior mineralized hole SMD-25-205, reinforcing down-dip and down-plunge extension potential.

What specific sulphide intervals were observed in NEXM's SMD-26-209 core?

Observers logged blebby, stringer and massive sulphides, including 3.05m and 5.95m massive intervals within the 10.50m zone. According to the company, chalcopyrite and pyrrhotite were visually identified in the core.

Are assay results available for NexMetals' SMD-26-209 (NEXM) drill hole?

No, assay results are not yet available; assays are pending and will be reported when validated. According to the company, visual observations are preliminary and require lab confirmation for grades.

How much drilling has NexMetals completed in the 2026 surface program at Selebi (NEXM)?

The company reports 19,130 metres completed to date across multiple holes and extensions. According to the company, this includes eight completed holes, one extension, three abandoned holes, and three in-progress holes.