STOCK TITAN

NexMetals Intersects 32.60 Metres of Mineralization at Selebi North Bridging Major Step-Out Holes & Strengthening MRE Expansion

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags

NexMetals Mining (NASDAQ:NEXM) has announced significant drilling results at its Selebi North Underground project, intersecting 32.60 metres of continuous mineralization, including 19.90 metres of massive sulphide across five sub-intervals. The new drill hole, SNUG-25-194, successfully bridges mineralization between two major step-out holes, with true thickness estimated at 60-65%.

The company plans to conduct borehole electromagnetic surveys to characterize conductive trends and confirm continuity. These results will be incorporated into an updated Mineral Resource Estimate (MRE), potentially expanding the resource envelope. The intersection represents the thickest interval of mineralization in NEXM's 2025 resource expansion program.

NexMetals Mining (NASDAQ:NEXM) ha annunciato significativi risultati di perforazione al progetto sotterraneo Selebi North, intercettando 32,60 metri di mineralizzazione continua, tra cui 19,90 metri di solfuri massivi in cinque sott-intervalli. Il nuovo pozzo SNUG-25-194 collega con successo la mineralizzazione tra due importanti pozzi di estensione, con uno spessore reale stimato dal 60% al 65%.

L’azienda intende eseguire indagini geofisiche a pozzo per caratterizzare le tendenze conduttive e confermare la continuità. Questi risultati verranno integrati in una stima aggiornata delle Risorse Minerali (MRE), potenzialmente ampliando l’area della risorsa. L’intersezione rappresenta l’intervallo più spesso di mineralizzazione nel programma di espansione delle risorse 2025 di NEXM.

NexMetals Mining (NASDAQ:NEXM) ha anunciado resultados significativos de perforación en su proyecto subterráneo Selebi North, interceptando 32,60 metros de mineralización continua, incluyendo 19,90 metros de sulfuros masivos en cinco subintervalos. El nuevo agujero de perforación, SNUG-25-194, conecta con éxito la mineralización entre dos pozos de expansión, con un espesor verdadero estimado entre el 60% y el 65%.

La compañía planifica realizar estudios electromagnéticos de pozo para caracterizar las tendencias conductivas y confirmar la continuidad. Estos resultados se incorporarán a una Actualización de Estimación de Recursos Minerales (MRE), potencialmente ampliando el entorno de recursos. La intersección representa el intervalo más grueso de mineralización en el programa de expansión de recursos 2025 de NEXM.

NexMetals Mining (NASDAQ:NEXM)가 Selebi North 지하 프로젝트의 중요한 시추 결과를 발표했습니다. 연속 광화물 32.60미터를 교차했으며, 그 중 대질 황광 19.90미터가 다섯 구간으로 나뉘어 있습니다. 새로운 시추구 SNUG-25-194은 두 개의 주요 확장구 사이의 광화물을 성공적으로 연결하며, 실제 두께는 60-65%로 추정됩니다.

회사는 도전 전도성 경향을 특징지하고 연속성을 확인하기 위해 보링 전자기 탐사를 계획하고 있습니다. 이 결과는 광물자원추정치(MRE) 업데이트에 반영되어 자원 범위를 확장할 가능성이 있습니다. 이 교차는 NEXM의 2025년 자원 확장 프로그램에서 가장 두꺼운 광화 구간을 나타냅니다.

NexMetals Mining (NASDAQ:NEXM) a annoncé des résultats de forage significatifs sur son projet souterrain Selebi North, avec 32,60 mètres de minéralisation continue intervalles, dont 19,90 mètres de sulfures massifs répartis sur cinq sous-intervalles. Le nouveau forage, SNUG-25-194, parvient à relier la minéralisation entre deux puits d’expansion majeurs, avec une épaisseur réelle estimée entre 60 et 65 %.

L’entreprise prévoit de réaliser des levés géophysiques par forage pour caractériser les tendances conductrices et confirmer la continuité. Ces résultats seront intégrés dans une Mise à jour de l’Estimation des Ressources Minérales (MRE), potentiellement en élargissant l’enveloppe des ressources. Cette intersection représente l’intervalle le plus épais de minéralisation dans le programme d’expansion des ressources 2025 de NEXM.

NexMetals Mining (NASDAQ:NEXM) hat bedeutende Bohrbefunde im Untertagprojekt Selebi North gemeldet und 32,60 Meter kontinuierliche Mineralisierung intersectiert, darunter 19,90 Meter massiven Sulfids über fünf Unterintervalle. Die neue Bohrung SNUG-25-194 verbindet erfolgreich die Minerali- sierung zwischen zwei wichtigen Erweiterungsbohrungen, wobei die effektive Dicke auf 60–65 % geschätzt wird.

Das Unternehmen plant Bohrloch-EM-Untersuchungen, um leitfähige Trends zu charakterisieren und die Kontinuität zu bestätigen. Diese Ergebnisse werden in eine aktualisierte Mineralressourcenschätzung (MRE) aufgenommen und könnten die Ressourcenhülle erweitern. Die Schnittstelle stellt das dickste Mineralisierungsintervall im 2025er Ressourcen-Erweiterungsprogramm von NEXM dar.

NexMetals Mining (NASDAQ:NEXM) قد أعلنت عن نتائج حفر بارزة في مشروعها العلوي Selebi North، حيث تم تقاطع 32.60 مترًا من Mineralization مستمر، بما في ذلك 19.90 مترًا من كبريتات ضخمة عبر خمسة فترات فرعية. الحفرة الجديدة SNUG-25-194 تربط بنجاح التعدين بين دفعتين رئيسيتين، ويُقدَّر السماكة الحقيقية بين 60% و65%.

تخطط الشركة لإجراء مسوحات كهروضوئية آبار لا characterization خطوط التوصيل والتأكد من الاستمرارية. ستُدمج هذه النتائج في تقدير موارد معدنية محدث (MRE)، مما قد يوسع نطاق الموارد. التقاطع يُمثل أضخم فجوة من المعدّن في برنامج توسيع الموارد 2025 لـ NEXM.

NexMetals Mining (NASDAQ:NEXM) 已宣布在 Selebi North 地下项目取得显著钻探结果,

交叉出32.60 米连续矿化,其中包含 19.90 米大块状硫化物,分布在五个子区间。新钻孔 SNUG-25-194 成功在两处关键扩展孔之间连接矿化,真实厚度估计为 60%–65%。

公司计划进行井孔电磁勘探,以表征导电趋势并确认连续性。这些结果将纳入更新的矿产资源估算(MRE),可能扩大资源包络。该交叉代表 NEXM 2025 年资源扩展计划中矿化最厚的区间。

Positive
  • Intersected significant mineralization of 32.60 metres, the thickest interval in 2025 program
  • Successfully demonstrated down-plunge continuity between major step-out holes
  • Results expected to contribute to resource expansion in updated MRE
Negative
  • Assays still pending for SNUG-25-194 and two additional holes
  • True thickness estimated at only 60-65% of intersected mineralization

Insights

NexMetals' 32.6m mineralization intersection at Selebi North bridges major step-outs, indicating significant resource expansion potential.

The latest drilling results from NexMetals represent a meaningful advancement in their Selebi North Underground project. Drill hole SNUG-25-194 has intercepted 32.60 meters of continuous mineralization with 19.90 meters of massive sulphide across five sub-intervals. This is particularly significant as it bridges the gap between two previous major step-out holes (SNUG-25-184 and SNUG-25-186) that were 183 meters and 313 meters down-plunge from the current Mineral Resource Estimate (MRE).

What makes this intercept technically important is the confirmation of mineralization continuity in the down-plunge direction. With an estimated true thickness of 60-65%, this substantial massive sulphide intersection aligns with the geological model for the South Limb at Selebi North. While assays are still pending (a critical element for determining economic value), the visual confirmation of massive sulphides is typically a positive indicator in base metal exploration.

The planned borehole electromagnetic (BHEM) surveys represent sound technical follow-up work. These surveys will characterize conductive trends associated with the massive sulphides, helping to confirm continuity and outline strike extent - essential data points for resource modeling. The systematic approach of drilling to connect widely-spaced step-out holes demonstrates a methodical exploration strategy designed to efficiently expand the resource footprint.

From a resource development perspective, this intersection's strategic location between previous step-out holes means it will likely contribute meaningfully to an expanded resource envelope in the upcoming MRE update. The consistent intercepts across multiple step-out holes suggest a potentially significant expansion of the current resource base, though the economic impact remains contingent on assay results and metallurgical characteristics that have yet to be reported.

Vancouver, British Columbia--(Newsfile Corp. - October 1, 2025) - NexMetals Mining Corp. (TSXV: NEXM) (NASDAQ: NEXM) (the "Company") is pleased to announce that it has successfully intersected significant massive sulphide mineralization within a newly completed drill hole at Selebi North Underground ("SNUG"), confirming the down-plunge continuity of mineralization. This intersection represents the thickest interval of mineralization drilled by NEXM in its 2025 resource expansion program and will be included in the future updated Mineral Resource Estimate ("MRE"). Assays are pending for SNUG-25-194 and an additional 2 holes.

Why this matters:

  • SNUG-25-194 intersected 32.60 metres of continuous mineralization at Selebi North South Limb, including an aggregate total of 19.90 metres of massive sulphide across five sub-intervals.
  • True thickness is estimated at 60 - 65%, which is consistent with geological interpretations of the South Limb.
  • Drill hole SNUG-25-194 was designed to bridge mineralization between two widely spaced resource expansion drill holes SNUG-25-184, located 183 metres down-plunge from the current MRE, and SNUG-25-186, a further 130 metre step-out (see news releases dated June 30 and August 13, 2025).
  • The demonstrated continuity between these two major step-outs and results from additional strike step-outs from the resource expansion program can be incorporated into a future MRE update, supporting a potential expansion of the resource envelope.

Next Steps:

  • Borehole electromagnetic ("BHEM") surveys are planned to characterize the conductive trends associated with the newly intersected massive sulphides to confirm continuity and outline strike extent.
  • Initial interpretations indicate that the new data will contribute to resource expansion in an updated MRE.
  • Ongoing drilling to further demonstrate the scale, continuity, and expansion potential of the Selebi North deposit.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7759/268661_4dd38744a4b37b20_002.jpg

Figure 1: Location of drill holes relative to the MRE and underground infrastructure.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7759/268661_4dd38744a4b37b20_002full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7759/268661_4dd38744a4b37b20_003.jpg

Figure 2. Drill core photo SNUG-25-194 click here for full photos.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7759/268661_4dd38744a4b37b20_003full.jpg

Drill core photos for all holes reported herein, can be found on the Company's website at www.nexmetalsmining.com.

To view the 3D modeling, please visit the following link https://vrify.com/decks/20239.

Morgan Lekstrom, CEO of the Company, commented: "This is a critical confirmation point for Selebi North. By bridging two major step-out holes and intersecting significant massive sulphide intervals, we have validated the down-plunge continuity and further strengthened our geological model. Once assays are received, these results will be incorporated into the updated MRE, reinforcing Selebi North's scale, quality, and expansion potential."

Qualified Person

All scientific and technical information in this news release has been reviewed and approved by Sharon Taylor, VP Exploration of the Company, MSc, P.Geo, and a "qualified person" for the purposes of National Instrument 43-101 and Subpart 1300 of Regulation S-K.

Quality Control

The underground drilling program is being carried out through an agreement with Forage Fusion Drilling Ltd. of Hawkesbury, Ontario, Canada, who have provided three Zinex U-5 drills for purchase and training of local operators. Drill core samples are BQTK (40.7 mm diameter). All samples are ½ core cut by a diamond saw on site. Half of the core is retained for reference purposes. Samples are generally 1.0 to 1.5 metre intervals or less at the discretion of the site geologists. Sample preparation and lab analysis was completed at ALS Chemex in Johannesburg, South Africa. Commercially prepared blank samples and certified Cu/Ni sulphide analytical control standards with a range of grades are inserted in every batch of 20 samples or a minimum of one set per sample batch. Analyses for Ni, Cu and Co are completed using a peroxide fusion preparation and ICP-AES finish (ME-ICP81).

Holes are numbered as follows: SNUG (Selebi North Underground) + year + hole number starting at 013.

Technical Report

The MRE on the Selebi Mine is supported by the technical report entitled "Technical Report, Selebi Mines, Central District, Republic of Botswana" and dated September 20, 2024 (with an effective date of June 30, 2024) (the "Selebi Technical Report"), and prepared by SLR Consulting (Canada) Ltd. for NEXM. Reference should be made to the full text of the Selebi Technical Report, which was prepared in accordance with NI 43-101 and is available on SEDAR+ (www.sedarplus.ca) under NEXM's issuer profile.

About NexMetals Mining Corp.

NexMetals Mining Corp. is a mineral exploration and development company that is focused on the redevelopment of the previously producing copper, nickel and cobalt resources mines owned by the Company in the Republic of Botswana.

NexMetals is committed to governance through transparent accountability and open communication within our team and our stakeholders. NexMetals' team brings extensive experience across the full spectrum of mine discovery and development. Collectively, the team has contributed to dozens of projects, including work on the Company's Selebi and Selkirk mines. Senior team members each have on average, more than 20 years of experience spanning geology, engineering, operations, and project development.

For further information about NexMetals Mining Corp., please contact:

Morgan Lekstrom
CEO and Director
morganl@nexmetalsmining.com

Jaclyn Ruptash
V.P., Communications and Investor Relations
jaclyn@nexmetalsmining.com
1-833-770-4334

Follow Us

X: https://x.com/NexMetalsCorp
LinkedIn: https://www.linkedin.com/company/NexMetalsMiningCorp
Facebook: https://www.facebook.com/NexMetalsMiningCorp

Neither the TSX Venture Exchange and its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) nor the Nasdaq Stock Market LLC accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

Cautionary Note Regarding Forward-Looking Statements

This news release contains "forward-looking statements" within the meaning of the United States federal securities laws and "forward-looking information" within the meaning of applicable Canadian securities legislation (collectively, "forward-looking information") based on expectations, estimates and projections as at the date of this news release. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. For the purposes of this release, forward-looking information includes, but is not limited to: ongoing and expected drilling at SNUG; possible expanded mineralization beyond the existing MRE; the release of assay results and the expected timing thereof; the preparation and release of an updated MRE; planned BHEM surveys and the timing and completion thereof; the implementation of the objectives, goals and future plans of the Company including the proposed advancement of the Selebi Mine as currently contemplated; the expectation that exploration activities (including drill results) will accurately predict mineralization; the expectation that the Company will implement its drilling, geoscience and metallurgical work on its properties and work plans generally; the effective targeting activities proposed by the Company; the benefits of the Company's approach to exploration; and the anticipated benefits of the Company's approach to the resource development plan. These forward-looking statements, by their nature, require the Company to make certain assumptions and necessarily involve known and unknown risks and uncertainties that could cause actual results to differ materially from those expressed or implied in these forward-looking statements. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, capital and operating costs varying significantly from estimates; the preliminary nature of drilling and metallurgical test results; the ability of exploration results to predict mineralization, prefeasibility or the feasibility of mine production; the risk that assay results will not be as anticipated or received when anticipated; the risk that the Company will not prepare and release an updated MRE on the timing anticipated or at all; the risk that the Company cannot complete the planned BHEM surveys; delays in obtaining or failures to obtain required governmental, environmental or other project approvals; uncertainties relating to the availability and costs of financing needed in the future; changes in equity markets; inflation; fluctuations in commodity prices; delays in the development of projects; the other risks involved in the mineral exploration and development industry; and those risks set out in the Company's public disclosure record on SEDAR+ (www.sedarplus.com) under NEXM's issuer profile. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/268661

FAQ

What were the key findings in NEXM's latest drilling results at Selebi North?

NexMetals intersected 32.60 metres of continuous mineralization, including 19.90 metres of massive sulphide across five sub-intervals, representing the thickest interval in their 2025 resource expansion program.

How significant is the SNUG-25-194 drill hole for NEXM's exploration program?

SNUG-25-194 is significant as it bridges mineralization between two widely spaced resource expansion drill holes, confirming down-plunge continuity and supporting potential resource envelope expansion.

What is the estimated true thickness of the mineralization in NEXM's latest drilling?

The true thickness of the mineralization is estimated at 60-65% of the intersected interval, which aligns with geological interpretations of the South Limb.

What are NexMetals' next steps for the Selebi North project?

NEXM plans to conduct borehole electromagnetic surveys to characterize conductive trends, confirm continuity, and continue drilling to demonstrate the scale and expansion potential of the deposit.

When will NEXM receive the assay results for the latest drilling?

Assays are currently pending for drill hole SNUG-25-194 and two additional holes, with results to be incorporated into a future Mineral Resource Estimate update.
NEXMETALS MINING CORP.

NASDAQ:NEXM

NEXM Rankings

NEXM Latest News

NEXM Latest SEC Filings

NEXM Stock Data

122.27M
20.79M
3.07%
28.18%
0.48%
Other Industrial Metals & Mining
Metal Mining
Link
Canada
TORONTO