New Found Gold Reports Q3 2026 Financial and Operational Results
Hammerdown generated mine operating income, but operating cash flow remained negative and production costs exceeded the preliminary study estimate.
Sentiment and the balance of points
Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.
Rhea-AI Summary
New Found Gold (NFGC) reported third-quarter revenue of C$41.6 million as Hammerdown reached commercial production during the quarter. Gold production was 4,863 ounces, and mine operating income was C$18.6 million. The net loss narrowed to C$7.1 million from C$12.9 million a year earlier. Cash costs were US$2,887 per ounce, while all-in sustaining costs were US$3,279, above the preliminary mine study estimate. Operating activities used C$6.8 million, and quarter-end cash was C$167.1 million.
Queensway's revised preliminary economic assessment estimates an after-tax net present value of C$1.728 billion, discounted at 5%, at US$3,600 gold. Measured and Indicated resources increased 38%. The company says Phase 1 is fully funded and targets first mineralized material delivery to Pine Cove in Q4 2027. Its environmental report is under public review, with a ministerial decision pending.
How this balance works
Rhea-AI gives every point it takes from this document a weight. Minor counts 1, Moderate 3 and Major 9, so one Major point outweighs several Minor ones. The bar adds up the weights on each side, and when neither side holds more than 65% of the total the balance reads Mixed.
It reads the document as published, with the same rules for every company, and it does not look at what the market expected or at how the stock traded, so a point can be objectively good on a day the stock falls.
Rhea-AI Sentiment measures something else, the tone of the wording.
Hollow bars mark forward-looking points. How the balance works
Positive
- Moderate pointHammerdown commercial production began August 19, 2026, with Q3 output of 4,863 gold ounces.
- Moderate pointQ3 revenue of C$41.6 million came from 6,935 ounces sold at US$4,285 per ounce.
- Moderate pointQ3 mine operating income of C$18.6 million represented 45% of revenue.
- Moderate pointQ3 net loss narrowed to C$7.1 million, or C$0.02 per share, from C$12.9 million, or C$0.06.
- Moderate pointQ3 operating cash use narrowed to C$6.767 million from C$16.028 million a year earlier.
- Moderate pointC$115 million bought-deal financing contributed to increased working capital versus year-end.
- Moderate pointC$70 million credit-facility drawdown provided funding through Tranche 1.
- Moderate point. Forward-looking: it has not happened yet and may not happen.Queensway preliminary valuation estimates C$1.728 billion after-tax net present value at a 5% discount rate and US$3,600 gold.
- Moderate pointMeasured and Indicated resources increased 38% to 27.3 million tonnes at 2.19 grams per tonne, containing 1.92 million ounces.
- Moderate point. Forward-looking: it has not happened yet and may not happen.Queensway Phase 1 is fully funded, with first mineralized material delivery to Pine Cove targeted for Q4 2027.
12 minor points
- Minor pointQ3 EBITDA of C$13.1 million reversed negative C$12.8 million a year earlier; EBITDA excludes interest, taxes, depreciation and amortization.
- Minor pointQ3 processed grade of 2.77 grams per tonne was 31% above the year-to-date average; recovery was 84.2%.
- Minor pointNine-month production reached 10,670 ounces, with 10,878 ounces sold and C$67.2 million revenue.
- Minor pointNine-month operating cash use narrowed to C$31.287 million from C$34.714 million a year earlier.
- Minor point. Forward-looking: it has not happened yet and may not happen.Queensway preliminary return estimate is 126% after tax at US$3,600 gold, with payback under one year.
- Minor point. Forward-looking: it has not happened yet and may not happen.Queensway US$4,100 gold scenario estimates C$2.225 billion after-tax net present value and a 164% return.
- Minor point. Forward-looking: it has not happened yet and may not happen.Queensway preliminary mine plan projects 1.744 million ounces over 15 years, averaging approximately 116,000 ounces annually.
- Minor point. Forward-looking: it has not happened yet and may not happen.Queensway peak annual production is projected at approximately 190,000 ounces in 2032.
- Minor point. Forward-looking: it has not happened yet and may not happen.Queensway projected unit costs are US$985 cash costs and US$1,375 all-in sustaining costs per gold ounce.
- Minor point. Forward-looking: it has not happened yet and may not happen.Mining and processing optimization, including sorter commissioning and circuit conversion, is expected to lower future production costs.
- Minor pointHammerdown infill, location-verification and condemnation drilling for 2026 is complete; grade-control drilling continues.
- Minor pointZero lost-time incidents occurred through September 30, 2026, across more than 328,000 Hammerdown person-hours.
Negative
- Moderate pointQ3 all-in sustaining costs of US$3,279 per ounce exceeded the Hammerdown preliminary study estimate by US$904 per ounce.
- Moderate point. Forward-looking: it has not happened yet and may not happen.Elevated fuel and water-treatment costs remain under assessment for their impact on reaching preliminary-study production metrics.
- Moderate pointNine-month net loss widened to C$37.301 million from C$32.445 million; per-share loss fell to C$0.14 from C$0.15.
- Moderate pointC$115 million equity financing added shares, diluting existing holders.
- Moderate pointC$70 million senior secured borrowing added debt obligations.
- Moderate point. Forward-looking: it has not happened yet and may not happen.Queensway planned capital requirements include approximately C$149.8 million initially, C$832 million growth capital and C$971 million sustaining capital.
- Moderate point. Forward-looking: it has not happened yet and may not happen.Queensway later-phase growth capital is anticipated to depend on cash flows from Phases 1 and 2.
9 minor points
- Minor pointQ3 cash costs were US$2,887 per ounce, affected by stripping, grade, drilling, fuel and water-treatment costs.
- Minor pointQ3 strip ratio was 30% above plan, adding US$350 per ounce to all-in sustaining costs.
- Minor pointQ3 head grade was 11% below plan, adding US$135 per ounce to all-in sustaining costs.
- Minor pointNine-month EBITDA remained negative C$14.478 million, compared with negative C$31.850 million a year earlier.
- Minor pointQuarter-end cash fell to C$167.112 million from C$193.832 million at Q2.
- Minor pointQuarter-end working capital fell to C$167.272 million from C$187.184 million at Q2.
- Minor pointTotal liabilities rose to C$202.305 million from C$197.669 million at Q2.
- Minor pointQueensway environmental decision remains pending following submission and registration of its Phase 1 report on November 3, 2026.
- Minor pointQueensway quarterly drilling was below expectations because of contractor rig maintenance and deep directional infill drilling.
News Explained
At
Key Figures
- Gold production
- 4,863 ounces
- Q3 2026 at Hammerdown; commercial production achieved
- Revenue
- $41.6 million
- Q3 2026
- Income from mine operations
- $18.6 million
- Q3 2026; 45% of revenue
- Net loss
- $7.1 million ($0.02 per share)
- Q3 2026, compared with $12.9 million ($0.06 per share) in Q3 2025
- EBITDA
- $13.1 million
- Q3 2026, compared with negative $12.8 million in Q3 2025
- AISC
- US$3,279 per ounce
- Q3 2026 per ounce of gold produced
- Cash and cash equivalents
- $167.1 million
- As at September 30, 2026
Key Terms
all-in sustaining costs financial
preliminary economic assessment technical
net present value financial
internal rate of return financial
mineral resource estimate technical
AI-generated analysis. How Rhea-AI works. Not financial advice.
Canada's Newest Gold Producer Achieves Commercial Production at Hammerdown
Toronto, Ontario--(Newsfile Corp. - November 11, 2026) - New Found Gold Corp. (TSX: NFGC) (NYSE American: NFGC) ("New Found Gold" or the "Company") today announced that it has filed its financial statements for the three and nine months ended September 30, 2026 ("Q3 2026") and the related Management's Discussion and Analysis (together, the "Q3 Financials"). Preliminary operating results for Q3 2026 were disclosed in the Company's press release dated October 15, 2026. Management will host a webcast on Thursday, November 12, 2026, at 9:00 a.m. ET to discuss its results.
The Q3 Financials will be available under the Company's profile on SEDAR+ at www.sedarplus.com, the EDGAR system of the SEC at www.sec.gov., and on the Company's website at www.newfoundgold.ca.
Unless otherwise stated, all dollar amounts in this news release are expressed in Canadian dollars.
Q3 2026 Highlights:
- Safety: Zero lost-time incidents in 2026 to September 30, 2026, over more than 328,000 person-hours worked at the Hammerdown Gold Project;
- Production: Commercial production achieved at the Company's
100% owned Hammerdown Gold Mine ("Hammerdown") on August 19, 2026, with Q3 2026 gold production of 4,863 ounces, an average grade of 2.77 grams of gold per tonne ("g/t Au") and gold recovery of84.2% (Table 1); - Costs: Cash costs[1] of US
$2,887 per ounce of gold and AISC[2] of US$3,279 per ounce of gold produced for the quarter. Factors impacting cash costs and AISC included mine schedule reorganization to complete overburden stripping, blasting and ramp establishment in more favorable seasonal conditions, grade, infill drill costs, fuel surcharges and water treatment costs; - Revenue and Margins: Revenue of
$41.6 million ("M") from the sale of 6,935 ounces of gold at an average realized gold price of US$4,285 per ounce. Income from mine operations was$18.6M , or45% of revenue; - Net Loss:
$7.1M ($0.02 per share), compared to$12.9M ($0.06 per share) in Q3 2025, reflecting the commencement of commercial production at Hammerdown in Q3 2026 and resultant revenue and gold production;
- EBITDA[3]:
$13.1M , compared to ($12.8M ) in Q3 2025, driven by income from mine operations at Hammerdown; and - Cash Flow and Financial Position: Operating cash flow of
$11.2M before change in working capital, strong cash and cash equivalents position of$167.1M and working capital of$167.3M (Table 2).
Subsequent Events Highlights:
- Revised Queensway PEA and Updated MRE. On October 22, 2026, the Company announced a revised preliminary economic assessment ("2026 PEA") and the first update to the mineral resource estimate ("Updated MRE") for the Company's flagship Queensway Gold Project ("Queensway"), with an after-tax net present value using a
5% discount rate ("NPV₅%") of$1.728 billion ("B") at a base case gold price of US$3,600 per ounce (increasing to$2.225B at US$4,100 per ounce), an after-tax internal rate of return ("IRR") of126% (164% at US$4,100 per ounce), 1.744 M ounces of gold produced over a 15-year phased open-pit and underground life of mine ("LOM"), Phase 1 initial capital of approximately$149.8M , and a38% increase in Measured and Indicated Mineral Resources. - Queensway Phase 1 EPR submitted. The Environmental Preview Report ("EPR") was submitted to and registered by the provincial government on November 3, 2026, addressing information requests and feedback from public comments, government review, and engagement activities, including an open house in the Town of Appleton. The EPR is now in a 35-day public review period, and under provincial legislation the Minister's decision on the EPR will be provided within 45 days of submission, with the potential for a fourteen-day extension.
"Third quarter 2026 represents another important step forward for New Found Gold, becoming Canada's newest gold producer as Hammerdown reached commercial production. We produced 4,863 ounces of gold for the quarter and 10,670 ounces year to date, with strong operational and safety performance and zero lost-time incidents," stated Keith Boyle, CEO of New Found Gold. "Cash costs and AISC were impacted by advancing stripping activities originally planned for Q1 2027 to this quarter, in combination with lower head grade relative to the mine plan. As the team continue to ramp up mining operations, efforts to optimize mining and processing, including sorter commissioning and circuit conversion, is anticipated to lower future production costs."
"Subsequent to quarter-end, we delivered a revised PEA and updated MRE for our flagship Queensway asset, the culmination of roughly 18 months of drilling, engineering and technical work. These results strengthen the foundation for Queensway as a long-life gold asset in a top jurisdiction. With Phase 1 fully funded, we remain on schedule to deliver first mineralized material to the Pine Cove Mill in Q4/27, a key milestone on our path to becoming Canada's next mid-tier gold producer."
Operational Review
During Q3 2026, Hammerdown produced 4,863 oz of gold, accounting for approximately
For the nine months ended September 30, 2026, Hammerdown produced a total of 10,670 oz of gold as it ramped up to commercial production, mining 235,000 tonnes of mineralized material and processing 189,000 tonnes through Pine Cove at an average grade of 2.12 g/t and an average recovery of
Table 1: Consolidated Financial and Operating Highlights.
| In 000s, except per units and per share amounts | Q3 2026 | Q3 2025 | YTD 2026 | YTD 2025 |
| Financial Results | ||||
| Revenue | 41,580 | - | 67,190 | - |
| Cost of sales | 23,010 | - | 45,258 | - |
| Gross profit | 18,570 | - | 21,931 | - |
| EBITDA[4] | 13,090 | (12,758) | (14,478) | (31,850) |
| Net loss | (7,114) | (12,945) | (37,301) | (32,445) |
| Loss per share - basic and diluted | (0.02) | (0.06) | (0.14) | (0.15) |
| Cash used in operating activities | (6,767) | (16,028) | (31,287) | (34,714) |
| Avg. Realized Gold Price ($/oz sold) | 5,996 | - | 6,177 | - |
| Avg. Realized Gold Price (US$/oz sold) | 4,285 | - | 4,459 | - |
| Cash costs (US$/oz produced)[5] | 2,887 | - | 3,486 | - |
| AISC (US$/oz produced)[6] | 3,279 | - | 3,952 | - |
| Mining Activities | ||||
| Ore Tonnes Mined (kt) | 97 | - | 235 | - |
| Waste Tonnes Mined (kt) | 1,197 | - | 2,973 | - |
| Total Tonnes Mined (kt) | 1,294 | - | 3,208 | - |
| Strip Ratio (Waste/Ore) | 12.40 | - | 12.63 | - |
| Processing Activities | ||||
| Total Tonnes Processed (kt) | 66 | - | 189 | - |
| Avg. Gold Recovery (%) | 84.2 | - | 83.1 | - |
| Avg. Gold Grade Processed (g/t Au) | 2.77 | - | 2.12 | - |
| Gold Produced (oz) | 4,863 | - | 10,670 | - |
| Gold Sold (oz) | 6,935 | - | 10,878 | - |
Financial Review
For the three months ended September 30, 2026, the Company generated
- Cash costs of US
$2,887 ($4,040) per ounce of gold produced; - All-in sustaining costs of US
$3,279 ($4,588) per ounce of gold produced; - Material movement costs of
$11.51 per tonne of mineralized material and waste moved; - Milling costs of
$53.63 per tonne of mineralized material processed; and - G&A costs of
$11.52 per tonne of mineralized material processed.
For the nine months ended September 30, 2026, the Company generated
Compared with the 2026 Hammerdown Preliminary Economic Assessment ("2026 Hammerdown PEA"), Q3 2026 AISC showed a variance of US
Liquidity and Capital Resources
As at September 30, 2026, the Company is in a strong financial position, with cash and cash equivalents of
The Company manages its cash balances conservatively, holding funds primarily in high-quality financial institutions in Canada. Working capital fluctuations to September 30, 2026 were primarily driven by exploration expenditures at Queensway, operating and capital expenditures at Hammerdown and Pine Cove, and corporate activities.
Table 2. Financial position as at September 30, 2026.
| In 000s | Q3 2026 | Q2 2026 |
| Financial Position | ||
| Cash | 167,112 | 193,832 |
| Working capital | 167,272 | 187,184 |
| Total assets | 705,776 | 705,676 |
| Current liabilities | 40,214 | 42,925 |
| Total liabilities | 202,305 | 197,669 |
Queensway 2026 Work Program
The Company is currently progressing on its 2026 Queensway work program (the "Queensway 2026 Program"). The Queensway 2026 Program is focused on project de-risking in advance of development in addition to discovery and resource growth. At the end of Q3 2026 there were four drill rigs active at Queensway with a total of 61,557 metres drilled in 439 diamond drill holes ("DDH").
Advanced exploration drilling is focused on the conversion of Inferred Mineral Resources within the Phase 2 open pits and portions of the underground to Indicated Mineral Resources. Pre-development drilling includes ongoing grade control drilling at the Keats Zone and geotechnical drilling of the Phase 2 open pits, while exploration drilling and conversion drilling continues at the Dropkick Zone, approximately 11 km north of the AFZ Core in the AFZ Peripheral area, and at earlier-stage regional targets. Quarterly drilling activity was lower than anticipated due to contractor drill-rig maintenance and deep infill drilling using directional drilling within UG portions of the AFZ Core.
Hammerdown 2026 Drill Program
Drilling at Hammerdown in 2026 included infill, location verification drilling in proximity to historic underground workings, grade control and condemnation to support mine infrastructure planning. Infill, location verification drilling and condemnation drilling for 2026 is complete; grade control drilling is ongoing. A total of 27,484 m had been drilled in 293 DDH at the end of Q3 2026.
Subsequent Events
Queensway Revised PEA and Updated MRE
Post quarter end, on October 22, 2026, the Company released the 2026 PEA and Updated MRE for Queensway. The 2026 PEA has an effective date of October 19, 2026 and was prepared using the Updated MRE, which has an effective date of July 6, 2026 (with a database cut-off date of February 28, 2026). The Company intends to file a technical report in respect of the 2026 PEA and the Updated MRE (the "Updated Technical Report") on SEDAR+ (www.sedarplus.ca) and on EDGAR (www.sec.gov) under New Found Gold's issuer profile within 45 days of October 22, 2026. Scientific and technical information in this press release relating to the 2026 PEA and the Updated MRE is supported by the news release disseminated by the Company on October 22, 2026 (titled "New Found Gold Announces Queensway Gold Project Revised PEA and Updated MRE: After-Tax NPV Increases to
Revised PEA and updated MRE highlights include:
- After-tax NPV₅% of
$1.728B at a base case gold price of US$3,600 per ounce, increasing to$2.225B at an upside price of US$4,100 per ounce; - After-tax IRR of
126% at the base case price (164% at the upside price), with an after-tax payback period of less than one year; - 1.744 M ounces of gold produced over a 15-year mine life using a phased open-pit and underground operation, with average annual production of approximately 116,000 ounces and peak annual production of approximately 190,000 ounces in 2032;
- Average head grade of 13.41 g/t Au for Phase 1 and an LOM average head grade of 2.09 g/t Au with projected LOM recovery of
91.5% ; - Phase 1 initial capital of approximately
$150M , in line with the previous estimate,$832M in growth capital and$971M sustaining capital over LOM, with cash flows from Phases 1 and 2 anticipated to fund growth capital for Phases 2 and 3, respectively; - Cash costs and AISC of US
$985 per ounce of gold and US$1,375 per ounce of gold, respectively; and - A
38% increase in Measured and Indicated Mineral Resources (to 27.3 M tonnes at 2.19 g/t Au for 1.92 M contained ounces), in part from the addition of the Dropkick Zone, with Inferred Mineral Resources of 12.5 M tonnes at 1.51 g/t Au.
The revised study more than doubled Queensway's after-tax NPV
The Measured and Indicated Mineral Resource grew
The revised PEA keeps a phased approach but makes several key changes relative to the Company's previously released PEA for Queensway:
- Phase 1 will now use Pine Cove, which is being converted to a gravity-carbon-in-leach circuit;
- Mining starts with a contractor model and later moves to owner mining;
- The mine plan now includes peripheral deposits such as Dropkick, and underground ounces rise
86% ; - Underground mining moves up from Phase 3 to Phase 2, starting in 2030; and
- Cash flow from each phase is expected to fund the next, with mining planned to run until 2040.
The 2026 PEA is preliminary in nature. It includes Inferred Mineral Resources that are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as Mineral Reserves, and there is no certainty that the 2026 PEA will be realized. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. No Mineral Reserves have been defined for Queensway. Readers should refer to the 2026 PEA News Release and, once filed, the Updated Technical Report for the assumptions, qualifications and limitations of the 2026 PEA and MRE.
The quantity and grade of reported Inferred Mineral Resources are uncertain in nature and there has been insufficient exploration to define these resources as indicated or measured.
Queensway Phase 1 - Environmental Preview Report
The Queensway Phase 1 environmental registration ("ER") was submitted to the Newfoundland and Labrador ("NL") Department of Environment, Conservation and Climate Change on April 30, 2026 and registered on May 7, 2026, commencing the provincial environmental assessment ("EA") process under the NL Environmental Protection Act. By decision letter dated July 3, 2026, the Minister notified the Company that an EPR is required for Queensway Phase 1. On September 2, 2026, the Company received the EPR guidelines and submitted the EPR on November 3, 2026.
The EPR is now in a 35-day review by the Environmental Assessment Committee and the public. Under provincial legislation, a decision on the EPR will be provided within 45 days of submission, with the potential for a fourteen-day extension.
Outlook
The Company is advancing the Queensway 2026 Program, which is focused on de-risking, discovery and growth of its flagship project with the objective of sending first mineralized material to Pine Cove in Q4 2027.
Following release from the Queensway Phase 1 EA process, the Company plans to apply for and obtain a range of provincial and federal permits and to work with the province of NL to obtain a Surface and Mining Lease through mid-2027. Once the required permits are received, key Queensway development milestones include:
- Pine Cove expansion to 1,400 tpd capacity, targeted for completion in Q4 2027;
- Mobilization of contractors at Queensway in Q1 2027;
- Early works at the Queensway site beginning in Q2 2027, including clearing, grubbing, overburden removal, construction of the sound berm, site roads and water management facilities; and
- Mining, anticipated to begin in Q3 2027, to build a stockpile for delivery to Pine Cove commencing in Q4 2027.
At Hammerdown, the Company's priorities for the balance of 2026 and into 2027 are:
- Maintaining steady-state production;
- Substantial completion of the permanent on-site crusher and sorter in Q4 2026, followed by commissioning and ramp-up in Q1 2027, which is expected to reduce crushing costs and allow delivery of higher-grade material to the mill;
- Completion of infill and grade control drilling at the Hammerdown deposit in support of an updated Hammerdown MRE in 2027;
- Advance of the Pine Cove conversion and expansion; and
- Commencement of exploration on the Hammerdown Gold Project landholdings.
Q3 2026 Results Conference Call and Webcast
Senior management will host a conference call and webcast on Thursday, November 12, 2026, at 9:00 am (ET) to discuss results. Participants may join using the following details:
- Conference ID: 6267443
- Toll-Free (North America): (800) 715-9871
- International and Toronto: (647) 932-3411
- Webcast Link: https://www.gowebcasting.com/15191
Following the conference call the audio recording will be accessible through the New Found Gold website.
Non-IFRS Financial Measures
This press release refers to cash costs, cash costs per ounce of gold produced, AISC, AISC per ounce of gold produced, average realized gold price and EBITDA, which are non-IFRS financial measures or non-IFRS ratios. These measures do not have standardized meanings prescribed by IFRS and may not be comparable to similar measures presented by other issuers.
Management uses these measures to assess the operating performance of Hammerdown and the Company's ability to generate cash flow from its operations, and believes that investors and analysts use them to compare gold producers. They are intended to supplement, and not replace, measures prepared in accordance with IFRS.
Cash Costs
Cash costs comprise mining, processing and site administration costs incurred at Hammerdown and Pine Cove, together with selling expenses, and exclude depreciation and depletion, reclamation, sustaining capital, exploration, corporate G&A and financing costs. Cash costs are calculated as operating expenses within cost of sales, less depreciation and depletion, adjusted for the change in inventories, plus selling expenses. Cash costs per ounce produced is cash costs divided by gold ounces produced. Silver revenue is not deducted from cash costs.
Cash costs are a non-IFRS measure and should not be considered in isolation or as a substitute for measures prepared in accordance with IFRS.
Average Realized Gold Price
Average realized gold price is gold revenue under IFRS divided by gold equivalent ounces sold in the period.
All-In Sustaining Costs
AISC is based on guidance published by the World Gold Council ("WGC"). AISC comprises cash costs plus reclamation expense, sustaining exploration and sustaining capital expenditures at Hammerdown and Pine Cove. Sustaining capital expenditures are those required to maintain current production. AISC excludes growth capital, including the Pine Cove conversion and expansion, Queensway exploration and development, corporate G&A, share-based compensation, financing costs and income taxes. AISC per ounce produced is AISC divided by gold ounces produced.
For additional details, please refer to the Company's discussion of Non-IFRS and other performance measures in its Management's Discussion and Analysis, publicly available through SEDAR+ at www.sedarplus.ca and the EDGAR system of the SEC at www.sec.gov.
Qualified Person
The scientific and technical information disclosed in this press release was reviewed and approved by Keith Boyle, P.Eng., CEO, and a Qualified Person as defined under National Instrument 43-101. Mr. Boyle consents to the publication of this press release by New Found Gold. Mr. Boyle certifies that this press release fairly and accurately represents the scientific and technical information that forms the basis for this press release.
About New Found Gold
New Found Gold is Canada's newest gold producer with assets in Newfoundland and Labrador, Canada. The Company holds a
The Company's portfolio is further strengthened by its district-scale land package at Queensway, covering more than 110 km of strike length across two highly prospective fault zones, and a strong shareholder base, including renowned mining investor and cornerstone shareholder, Eric Sprott.
On August 26, 2026, the Company's shares began trading on the Toronto Stock Exchange under the symbol "NFGC", to align with its stock symbol on the NYSE American LLC.
Contact
For further information on New Found Gold contact us through our investor inquiry form on our website or contact:
Fiona Childe, Ph.D., P.Geo.
Vice President, Communications and Corporate Development
Phone: +1 (416) 775-2700
Email: contact@newfoundgold.ca
Forward-Looking Information
This news release contains certain "forward-looking statements" within the meaning of Canadian securities legislation, including statements regarding the intent to seek opportunities to optimize mining and processing efforts; the timeline for delivery of first mineralized material to the Pine Cove Mill; the timing and scope of the Queensway 2026 Program; the filing of the Updated Technical Report; the mine plan, including the anticipated production, payback, the life of mine recovery percentage and cash costs under the 2026 PEA and Updated MRE for Queensway; the planned application for provincial and federal permits following release from the Queensway Phase 1 EA process and work to obtain a Surface and Mining Lease through mid-2027; the anticipated milestones relating to Pine Cove expansion, mobilization of contractors, early works and mining at Queensway; the priorities for Hammerdown, including maintaining production, substantial completion of crusher and sorter, followed by commissioning and ramp-up, completion of infill and grade control drilling, advance of the Pine Cove conversion and expansion, and commencement of exploration at Hammerdown; the hosting of a conference call and webcast to discuss the results; and the Company's focus on advancing the Phase 1 of Queensway. Although the Company believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. Forward-looking statements are statements that are not historical facts; they are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "interpreted", "intends", "estimates", "projects", "aims", "suggests", "indicate", "often", "target", "future", "likely", "encouraging", "pending", "potential", "goal", "objective", "opportunity", "prospective", "possibly", "preliminary", and similar expressions, or that events or conditions "will", "would", "may", "can", "could" or "should" occur, or are those statements, which, by their nature, refer to future events. The Company cautions that forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made, and they involve a number of risks and uncertainties. Consequently, there can be no assurances that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Except to the extent required by applicable securities laws and the policies of the TSX, the Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change. Factors that could cause future results to differ materially from those anticipated in these forward-looking statements include risks associated with possible accidents and other risks associated with mineral exploration operations, the possibility that the Company may not be able to secure permitting and other governmental clearances necessary to carry out the Company's exploration plans, and the risk of political uncertainties and regulatory or legal changes that might interfere with the Company's business and prospects. The reader is urged to refer to the Company's Annual Information Form and Management's Discussion and Analysis, publicly available through the Canadian Securities Administrators' System for Electronic Document Analysis and Retrieval (SEDAR+) at www.sedarplus.ca for a more complete discussion of such risk factors and their potential effects.
[1] Cash costs is a Non-IFRS measure. See notes below for additional information regarding cash costs.
[2] AISC = all in sustaining costs; AISC is a Non-IFRS measure. See notes below for additional information regarding AISC.
[3] EBITDA is a Non-IFRS measure. See notes below for additional information regarding EBITDA.
[4]EBITDA is a Non-IFRS measure. See notes below for additional information regarding EBITDA
[5] Cash costs is a Non-IFRS measure. See notes below for additional information regarding cash costs
[6] AISC is a Non-IFRS measure. See notes below for additional information regarding AISC

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/323576
FAQ
AI-generated questions and answers. How Rhea-AI works. Not financial advice.
What were New Found Gold's Q3 2026 revenue and earnings?
New Found Gold generated C$41.6 million in revenue and recorded a net loss of C$7.1 million, or C$0.02 per share. The prior-year quarter had a net loss of C$12.9 million, or C$0.06 per share. Hammerdown generated C$18.6 million in mine operating income.
What does New Found Gold's revised Queensway preliminary economic assessment estimate?
Queensway's revised preliminary assessment estimates C$1.728 billion in after-tax net present value using a 5% discount rate and US$3,600 gold. It estimates a 126% after-tax internal rate of return and 1.744 million ounces of gold production over a 15-year mine life.
When is a decision expected on New Found Gold's Queensway environmental report?
The ministerial decision is due within 45 days of the November 3, 2026 submission, with a potential fourteen-day extension. The Environmental Preview Report is in a 35-day public review period and addresses information requests and feedback from public comments, government review and engagement activities.
When will New Found Gold file the updated Queensway technical report?
New Found Gold intends to file the updated technical report on SEDAR+ and EDGAR within 45 days of October 22, 2026. The preliminary economic assessment has an October 19, 2026 effective date; the updated resource estimate has a July 6, 2026 effective date and a February 28, 2026 database cutoff.
How much drilling had New Found Gold completed at Queensway and Hammerdown by Q3 2026?
By the end of Q3 2026, drilling totaled 61,557 metres in 439 diamond drill holes at Queensway and 27,484 metres in 293 holes at Hammerdown. Four rigs were active at Queensway. Its program includes resource conversion and pre-development drilling; Hammerdown grade-control drilling remains ongoing.