Power Metallic Intercepts 5.35 Meters of 11.97% Cu (16.35% CuEqRec) in Hole 25-022 Infill Drilling Expanding the Lion Zone and Updates on Fall/Winter Drill Program and Land Assembly
Rhea-AI Summary
Power Metallic (TSXV: PNPN / OTCBB: PNPNF) reported summer 2025 drill results that extend and infill the Lion zone and outline targets between Lion and Tiger. Key assays include 5.35 m @ 16.35% CuEqRec (within 6.85 m @ 13.15% CuEqRec) in hole PML-25-022 and 5.90 m @ 10.43% CuEqRec within 27.50 m @ 2.75% CuEqRec in PML-25-023. The company expanded its land package >600% to 313 km2 from 46 km2 and prioritized BHEM anomalies at Tiger Deep and re-entry of PN-24-064. Commercial marketing retainers announced total up to US$318,000 + €84,817 with related option grants subject to TSXV approval. A qualified person (Joseph Campbell, P.Geo) reviewed the technical disclosure.
Positive
- High-grade intercept: 5.35 m @ 16.35% CuEqRec in PML-25-022
- High-grade interval: 6.85 m @ 13.15% CuEqRec in PML-25-022
- Infill intercept: 5.90 m @ 10.43% CuEqRec in PML-25-023
- Land package expansion: 46 km2 to 313 km2 (>600% increase)
- Prioritised large BHEM anomalies at Tiger Deep and re-entry of PN-24-064
Negative
- Extensional drilling hampered by helicopter drill issues causing lost holes
- Two holes (PML-25-019, PML-25-024a) lost before reaching mineralized horizon
- Marketing retainers and option grants require TSXV approval, creating conditionality
News Market Reaction 1 Alert
On the day this news was published, PNPNF declined 10.38%, reflecting a significant negative market reaction.
Data tracked by StockTitan Argus on the day of publication.
Summer Drilling Release 2 – Lion – Tiger Area
The summer drilling program was designed to search for extensions to the Lion Zone, specifically down plunge from known mineralization, and to infill drill, including 'edge' holes, on the Lion zone to define the zone geometry to a confidence level that would allow a future mineral resource estimate to be carried out to an Indicated Resource classification.
Extensional Drilling Results (Table 1, Figure 1)
Extensional drilling was slow during the summer program as technical problems with the helicopter supported drills led to lost holes (such as holes PML-25-019 and 024a in this release) that did not reach the mineralization horizon for Lion. Hole PML-25-017 has extended the zone to the west but failed to intersect the High-grade massive sulphide portion of the Lion zone and returned a disseminated zone of 7.00m @
The Company intends to use more powerful skid drills when possible going forward when testing the Lion Zone extension at depth to avoid similar issues.
Mineral Resource(MRE) Drilling Results (Table 1, Figure 1)
In-fill drilling has successfully defined mineralization along some of the high-grade shoots that are internal to the Lion zone and defined the edges of the Lion zone for future MRE modelling. Drilling reported here intersected mineralization on Hanging-wall, High-grade, and Footwall portions of Lion, including High-grade sulphide intersections of 6.85m @
Terry Lynch, CEO of Power Metallic states "These are some amazing high-grade intersections. Any hole delivering over 50 meter % (Grade %*Metres) scores is an extremely lucrative hole. We have extended the known resource area and increased our understanding of the plunge of the Lion Zone. Our objective with drilling this summer was to extend the Lion Zone which is being accomplished and also to discover the next Lion Zone. That part we have not yet completed. But we have gained excellent insight that is guiding our fall and winter drilling program. In addition, we didn't drill our highest priority drill targets due to their proximity to the land assembly activities we were working on. With that ground now secured we can discuss those targets below."
|
Table 1: Release 2 - Assay results Summer 2025 - Nisk Project |
||||||||||
|
Hole |
From |
To |
Length |
Au |
Ag |
Cu |
Pd |
Pt |
Ni |
CuEq |
|
(m) |
(m) |
(m) |
(g/t) |
( g/t ) |
( %) |
(g/t) |
( g/t ) |
( %) |
( %) |
|
|
LION |
||||||||||
|
PML-25-017 |
539.00 |
546.00 |
7.00 |
0.92 |
2.35 |
0.38 |
0.01 |
0.01 |
0.14 |
1.41 |
|
Including |
539.00 |
540.00 |
1.00 |
4.90 |
10.90 |
2.32 |
0.01 |
0.01 |
0.18 |
6.35 |
|
PML-25-019 |
Hole lost before intersecting the mineralized horizon |
|||||||||
|
PML-25-022 |
358.20 |
364.40 |
6.60 |
0.11 |
1.78 |
0.23 |
3.46 |
0.54 |
0.02 |
1.71 |
|
Including |
358.20 |
360.20 |
2.00 |
0.30 |
4.20 |
0.59 |
10.60 |
1.66 |
0.05 |
5.05 |
|
and |
372.65 |
379.50 |
6.85 |
2.09 |
43.79 |
9.39 |
8.57 |
0.83 |
0.26 |
13.15 |
|
Including |
372.65 |
378.00 |
5.35 |
2.55 |
54.78 |
11.97 |
10.38 |
0.65 |
0.33 |
16.35 |
|
including |
412.70 |
413.75 |
1.05 |
0.03 |
10.40 |
2.45 |
0.02 |
0.01 |
0.17 |
2.45 |
|
PML-25-023 |
341.00 |
368.50 |
27.50 |
0.10 |
15.05 |
1.68 |
1.89 |
0.91 |
0.12 |
2.75 |
|
Including |
352.75 |
368.65 |
5.90 |
0.20 |
66.36 |
7.28 |
6.84 |
3.28 |
0.25 |
10.43 |
|
PML-25-024a |
Hole lost before intersecting the mineralized horizon |
|||||||||
|
PML-25-027 |
422.00 |
436.50 |
14.50 |
0.09 |
2.27 |
0.32 |
0.50 |
0.98 |
0.16 |
1.15 |
|
including |
428.00 |
430.00 |
2.00 |
0.11 |
6.50 |
1.40 |
0.53 |
6.22 |
0.75 |
4.81 |
|
LION - TIGER |
||||||||||
|
PML-25-021 |
436.30 |
440.00 |
3.70 |
0.57 |
3.93 |
0.55 |
0.41 |
0.18 |
0.18 |
1.48 |
|
including |
437.85 |
438.55 |
0.70 |
2.90 |
14.30 |
2.11 |
0.95 |
0.23 |
0.31 |
4.90 |
|
PML-25-026a |
no significant assay results |
|||||||||
|
PML-25-030 |
no significant assay results - Off hole BHEM anomaly |
|||||||||
|
Note: Reported length is downhole distance; true width based on model projections is estimated as |
1
Copper Equivalent Rec Calculation (CuEqRec1)
CuEqRec represents CuEq calculated based on the following metal prices (USD) : 2,360.15 $/oz Au, 27.98 $/oz Ag, 1,215.00 $/oz Pd, 1000.00 $/oz Pt, 4.00 $/lb Cu, 10.00 $/lb Ni and 22.50 $/lb Co., and a recovery grade of
Tiger Deep Target (Table 1, Figure 1)
Three holes reported here (PML-25-021, 026a, 030) were drilled below the depth resolution of the recent 2025 airborne VTEM survey completed by Power Metallic. These holes (Figure 1) were testing the area between Lion and Tiger to intersect the mineralized horizon and provide drill holes for BHEM surveys. Although essentially blind exploration drill holes, evidence from previous work, including shallow drilling, including intercepts of >
Hole PML-25-026, drilled closest to Lion returned no significant assays, while the BHEM survey off-hole conductors were pointing to the presence of the Lion deposit. Hole PML-25-021 intersected a modest Lion style mineralized zone (3.70m @
Hole PML-25-030 did not intersect significant mineralization, but the BHEM survey produced a large, possibly thick bodied anomaly deeper and to the east of the hole. The BHEM panel defined at Tiger Deep represents one of the biggest EM panels identified to date, larger than the original Lion airborne VTEM panel. This location is proximal to a postulated 'Deep Tiger' target that is based on reinterpretation of previous Tiger drilling and surface mapping that suggests Tiger is made up of 'rip-up' blocks of massive sulphides carried in a tonalitic intrusion from a deeper and larger deposit. Both the PML-25-030 and PML-25-021 BHEM anomalies are being prioritised for drilling (the PML-25-030 BHEM is currently being drilled).
For more detail on the results, the land assembly program and our future exploration program please check out the podcast we recorded along with this release just below the next image.
Power Metallic Podcast Discussing Results and Future Exploration Plans
Please click on or copy and paste the below web address into your browser
Land Assembly Activities
Power Metallic's discovery of the Lion Zone changed the geological understanding for the basin. We now understand that the Lion zone and the Nisk deposits are parts of a remobilized polymetallic Ni-Cu system, which are rare, but historically have always occurred at district scales and produce giant deposits. Based on this knowledge over the last several months we assembled more than a
For now, we are in sole possession of the geological understanding about what works in respect to making discoveries in this regional Basin. Our search encompasses the entire basin, but we have acquired the local basin edges as the lowest hanging fruit to explore first (shallower deposits close to known mineralization), and this was the central strategy for acquiring the Li-FT ground in June (Figure 2). Subsequent exploration, including airborne VTEM and magnetics and field mapping and sampling, have developed dozens of target areas for Cu- Ni mineralization. These are currently being prioritized and drilled following receiving drill permits (ATIs in Figure 2).
Arguably our most important acquisition is land that had been under an exclusion from Hydro Quebec surface leases (Hydro ground - Figure 2). With the assistance of the James Bay Cree, we were able to successfully convince the
The Hydro area covers an interpreted fold hinge that could provide a thickening of projected Cu and Ni mineralization proximal to the Lion and Tiger zones. An analogue deposit we believe is comparable to the Nisk and Lion deposits is the
The potential of a fold hinge target is supported by magnetic data (Figures 4 and 5) that has modelled the folded ultramafic host rocks. Subsequent BHEM anomalies in holes PN-24-064 (Figure 4) and PML-25-030 and 021 further suggest a large body of mineralization is coincident with the anticipated fold hinge. The BHEM anomaly detected in PN-24-064 had greater than one hundred meters of build up at the bottom of the hole however the hole didn't have the required length to show the full anomaly. Re-entry of PN-24-064 is underway to extend the hole a further 250 meters – to fully define where the BHEM panel exists, and to potentially intersect a portion of the conductive body.
Power Metallic Announces Marketing Services Programs
In advance of potential expansion to broader capital market exchanges, Power Metallic has entered the following marketing services agreements.
In addition, the Company is pleased to announce that it entered into a service agreement with Native Ads, Inc. ("Native Ads") dated October 29, 2025 pursuant to which Native Ads will provide a marketing campaign for a total retainer of up to
The Company has also entered into a service agreement with Sideways Frequency ("Sideways") November 3, 2025 pursuant to which Sideways will provide a market awareness campaign for a total retainer of up to
Finally, the Company has retained Apaton Finance GmbH who will provide a market awareness campaign for a total retainer of up to
Qualified Person
Joseph Campbell, P.Geo, VP Exploration at Power Metallic, is the qualified person who has reviewed and approved the technical disclosure contained in this news release.
About Power Metallic Mines Inc.
Power Metallic is a Canadian exploration company focused on advancing the Nisk Project Area (Nisk–Lion–Tiger)—a high–grade Copper–PGE, Nickel, gold and silver system—toward Canada's next polymetallic mine.
On 1 February 2021, Power Metallic (then Chilean Metals) secured an option to earn up to
Power Metallic is expanding mineralization at the Nisk and Lion discovery zones, evaluating the Tiger target, and exploring the enlarged land package through successive drill programs.
Beyond the Nisk Project Area, Power Metallic indirectly has an interest in significant land packages in
It also owns
For further information, readers are encouraged to contact:
Power Metallic Mines Inc.
The Canadian Venture Building
82 Richmond St East, Suite 202
QAQC and Sampling
GeoVector Management Inc ("GeoVector") is the Consulting company retained to perform the actual drilling program, which includes core logging and sampling of the drill core.
All samples were submitted to and analyzed at Activation Laboratories Ltd ("Actlabs"), an independent commercial laboratory for both the sample preparation and assaying. Actlabs is a commercial laboratory independent of Power Metallic with no interest in the Nisk Project. Actlabs is an ISO 9001 and 17025 certified and accredited laboratories. Samples submitted through Actlabs are run through standard preparation methods and analysed using RX-1 (Dry, crush (< 7 kg) up to
GeoVector's QAQC program includes regular insertion of CRM standards, duplicates, and blanks into the sample stream with a stringent review of all results. QAQC and data validation was performed, and no material errors were observed.
Neither the TSX Venture Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.
Cautionary Note Regarding Forward-Looking Statements
This message contains certain statements that may be deemed "forward-looking statements" concerning the Company within the meaning of applicable securities laws. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential," "indicates," "opportunity," "possible" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, are subject to risks and uncertainties, and actual results or realities may differ materially from those in the forward-looking statements. Such material risks and uncertainties include, but are not limited to, among others; the timing for various drilling plans; the ability to raise sufficient capital to fund its obligations and conduct drilling and exploration; to maintain its mineral tenures and concessions in good standing; to explore and develop its projects; changes in economic conditions or financial markets; the inherent hazards associates with mineral exploration and mining operations; future prices of nickel and other metals; changes in general economic conditions; accuracy of mineral resource and reserve estimates; the potential for new discoveries; the ability of the Company to obtain the necessary permits and consents required to explore, drill and develop the projects and if accepted, to obtain such licenses and approvals in a timely fashion relative to the Company's plans and business objectives for the applicable project; the general ability of the Company to monetize its mineral resources; changes in environmental and other laws or regulations that could have an impact on the Company's operations; compliance with environmental laws and regulations; dependence on key management personnel; impacts of marketing services programs in drawing awareness to the Company; and general competition in the mining industry.
View original content to download multimedia:https://www.prnewswire.com/news-releases/power-metallic-intercepts-5-35-meters-of-11-97-cu-16-35-cueqrec-in-hole-25-022-infill-drilling-expanding-the-lion-zone-and-updates-on-fallwinter-drill-program-and-land-assembly-302603560.html
SOURCE Power Metallic Mines Inc.