RPX Gold Inc. reports exploration and development updates for its 100%-owned Wawa Gold Project in the Michipicoten Greenstone Belt of northwestern Ontario. Company news centers on gold drilling results, near-surface and high-grade mineralization, the Jubilee Shear and Cooper area, and technical work supporting mineral-resource and development planning.
Recurring updates also cover NI 43-101 technical reports, Preliminary Economic Assessment work, environmental, metallurgical and geotechnical sampling, and plans that evaluate staged open-pit and underground mining scenarios. Corporate items include the company’s name change from Red Pine Exploration Inc., shareholder meeting results, share-structure matters and other governance disclosures.
Red Pine (OTCQB: RDEXF) announced results of its annual meeting held January 21, 2026. Shareholders re-elected six directors, reappointed MNP LLP as auditor, approved a name change to RPX Gold, and approved an amendment to delete the class of Preference Shares and update common share terms. The Board resolved to proceed with the name change pending regulatory and exchange approvals; the ticker will remain RDEXF. Effective January 21, 2026, the Board granted 2,915,000 stock options at $0.21 per share (25% vesting at grant; fully vested by Jan 21, 2029; expiry Jan 21, 2031). There are 9,606,565 options outstanding, with 504,315 remaining available under the fixed-number plan.
Red Pine (OTCQB:RDEXF) reported 2025 milestones and a 2026 roadmap advancing the Wawa Gold Project from exploration toward development and potential production. In 2025 the company completed ~15,000 m of step-out drilling with multiple high-grade intercepts (e.g., 5.68 g/t Au over 10.72 m, 82.50 g/t Au over 0.74 m), identified a southern faulted extension of the Jubilee Shear, and completed >10,000 m of focused near-surface definition drilling. Red Pine closed a fully subscribed private placement of $8.5 million to fund completion of a Preliminary Economic Assessment (PEA) expected in early 2026. Planned 2026 work includes completing the PEA/NI 43-101 report, advancing environmental baseline studies and a PFS for staged open-pit scenarios, community engagement, and securing a processing plant for a toll-milling option.
Red Pine Exploration (OTCQB: RDEXF) reported assay results from 18 drill holes (2,233 m) at the Wawa Gold Project on December 16, 2025, targeting near-surface, open-pit mineralization along the Jubilee Shear.
Key intercepts include 10.05 g/t Au over 8.59 m (SD-25-616) including 82.80 g/t Au over 0.92 m, and 4.63 g/t Au over 13.25 m (SD-25-593) with higher-grade internal zones. Intercepts use a 0.40 g/t cutoff and reported core lengths with true widths estimated at 50–95%.
The company selected DRA Global to complete a PEA, targeting completion in H1 2026.
Red Pine (OTCQB: RDEXF) reported exploration results from the Cooper area at the Wawa Gold Project, Ontario, from two drill holes totalling 1,487 m completed July 2025. Highlights include 82.50 g/t Au over 0.74 m in a quartz-tourmaline vein in the Y106 shear at 288.97–289.71 m, and a 4.41 g/t Au over 0.51 m intercept in Y106.
Company interpretations trace the Y106 shear >500 m along strike and ~320 m down-dip; the Jubilee shear extends 525 m north of the mineral resource. A fully funded Preliminary Economic Assessment remains on schedule for H1 2026. QA/QC procedures and assay methods are described.
Red Pine (OTCQB: RDEXF) has commenced a 9,000 metre drilling program at the Wawa Gold Project to better define near-surface, higher-grade gold mineralization and to collect samples for environmental, metallurgical and geotechnical analysis as part of an ongoing Preliminary Economic Assessment (PEA). The company said the program is fully funded and will target potential open-pit areas along the Jubilee Shear, the crown pillars of the former Jubilee and Surluga Mines, infill zones for grade validation, and margins of new high-grade zones discovered in 2025.
Timing and QA/QC: Red Pine remains on track to complete the PEA in the first half of 2026. Sampling follows detailed QA/QC procedures including half-core sampling, quarter-core duplicates, insertion of standards/blanks every 20 samples, 1kg metallic screen assays when warranted, and ~5% of pulps/coarse rejects sent for umpire testing.
Red Pine (OTCQB: RDEXF) has begun a mechanized surface trenching, mapping and sampling program at the Wawa Gold Project to define near‑surface geometry in areas with open‑pit potential.
Work targets ~60 m of strike in the North Pit area plus satellite trenches, and follows recent high‑grade drill results. Baseline studies include 8 monitoring wells and groundwater testing. The company expects an updated mineral resource estimate and a PEA in H1 2026. QA/QC procedures and third‑party umpire assays are in place.
Red Pine Exploration (OTCQB: RDEXF) has announced significant drilling results from its Wawa Gold Project, highlighted by an intersection of 7.76 g/t gold over 15.49 meters in the potential open pit area. The company has completed its diamond drilling program of 69 drill holes totaling 24,531.19 meters.
Key highlights include multiple high-grade intersections, with the most notable being 84.20 g/t Au over 1.00m in hole SD-25-573. The company has received all gold assay results for an updated independent mineral resource estimate being prepared by WSP Canada Inc.
Red Pine plans to complete a Preliminary Economic Assessment (PEA) in the first half of 2026, with metallurgical, geotechnical, and baseline work underway to support permitting. The company is funded to complete the PEA and aims to transition from explorer to producer.
Red Pine Exploration (OTCQB: RDEXF) has announced significant drilling results from its Wawa Gold Project, highlighting the potential for open pit mining. The company intersected 9.03 g/t gold over 14.00 meters, including an impressive 54.40 g/t Au over 2.00 meters in hole SD-25-581.
The drilling program, completed with 69 drill holes totaling 24,575 meters, aims to strengthen the geological database for an upcoming mineral resource update. The company plans to conduct a Preliminary Economic Assessment (PEA) in early 2026 to evaluate optimal mining and processing strategies, including potential toll milling opportunities.
Additional notable intersections include 2.66 g/t Au over 10.13 meters and 2.47 g/t Au over 7.50 meters, with satellite zones in the hanging wall showing potential to reduce stripping ratios.
[ "High-grade gold intersections near surface with 9.03 g/t Au over 14.00 meters", "Successful completion of 69-hole drilling program totaling 24,575 meters", "Additional gold mineralization in satellite zones could reduce stripping ratio", "Advancing towards PEA in early 2026 with baseline studies underway", "Potential for toll milling using regional infrastructure" ]Red Pine Exploration (OTCQB: RDEXF) has successfully completed its 2024-25 drilling program at the Wawa Gold Project, executing 69 drill holes totaling 24,574.5 metres. The program achieved two main objectives: strengthening the geological database for potential starter open pits and testing the gold system's size potential beyond the 2024 Mineral Resource Estimate.
Notable drilling results include intersections of 45.38 g/t Au over 3.13m and 14.51 g/t Au over 4.81m. The company has initiated a Preliminary Economic Assessment (PEA), expected to complete in early H1 2026, and has engaged an environmental consultant with 25+ years of experience. Following a recent financing round, Red Pine is fully funded to complete the PEA and commence baseline studies for the permitting process.