Talisker Intersects 301.88 g/t Au over 0.55 m within 79.23 g/t Au over 2.10 metres in the Bralorne West Zone - 2026 Bralorne Gold Project Resource Conversion Program
Mustang Mine drilling in 2026 totals 25,442 metres across 92 holes as underground development continues in Bralorne West.
Sentiment and the balance of points
Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.
Rhea-AI Summary
Talisker Resources (TSKFF) reported results from 17 additional drill holes in the Bralorne West zone at its producing Mustang Mine.
Hole UB-2026-060 intersected 301.88 grams of gold per tonne over 0.55 metres within 79.23 grams per tonne over 2.10 metres on the 276 Vein. Other results included 19.84 grams per tonne over 2.30 metres on the 55HW Vein in SB-2026-035 and 16.29 grams per tonne over 2.15 metres on the 101 Vein in SB-2026-032.
Total Mustang drilling in 2026 reached 25,442 metres in 92 holes. Underground development continues in Bralorne West, where the first underground diamond drill bay is actively conducting infill drilling to better define mineralization.
How this balance works
Rhea-AI gives every point it takes from this document a weight. Minor counts 1, Moderate 3 and Major 9, so one Major point outweighs several Minor ones. The bar adds up the weights on each side, and when neither side holds more than 65% of the total the balance reads Mixed.
It reads the document as published, with the same rules for every company, and it does not look at what the market expected or at how the stock traded, so a point can be objectively good on a day the stock falls.
Rhea-AI Sentiment measures something else, the tone of the wording.
Positive
- Moderate pointUB-2026-060 intersected 301.88 g/t gold over 0.55 m within 79.23 g/t over 2.10 m on the 276 Vein.
- Minor pointSB-2026-035 intersected 56.96 g/t gold over 0.80 m within 19.84 g/t over 2.30 m on 55HW.
- Minor pointSB-2026-032 intersected 40.90 g/t gold over 0.70 m within 16.29 g/t over 2.15 m on 101.
- Minor pointUB-2026-052 intersected 38.63 g/t gold over 0.85 m within 15.14 g/t over 2.20 m on 55HW.
- Minor pointSB-2026-037 intersected 58.36 g/t gold over 0.50 m within 12.78 g/t over 2.45 m on 101.
10 minor points
- Minor pointUB-2026-060 intersected 30.19 g/t gold over 0.55 m within 12.34 g/t over 2.45 m on 55HW.
- Minor pointUB-2026-054 intersected 32.46 g/t gold over 0.60 m within 11.25 g/t over 2.00 m on 278.
- Minor pointUB-2026-046 intersected 23.78 g/t gold over 1.05 m within 11.10 g/t over 2.25 m on 55HW.
- Minor pointSB-2026-037 intersected 33.44 g/t gold over 0.55 m within 9.74 g/t over 3.05 m on 55.
- Minor pointUB-2026-050 intersected 15.76 g/t gold over 0.65 m within 9.51 g/t over 2.45 m on 276.
- Minor pointSB-2026-038 intersected 32.07 g/t gold over 0.60 m within 8.77 g/t over 2.20 m on 55HW.
- Minor pointUB-2026-050 intersected 25.20 g/t gold over 0.55 m within 7.75 g/t over 2.10 m on 55HW.
- Minor pointUB-2026-058 intersected 11.90 g/t gold over 0.50 m within 5.72 g/t over 2.40 m on 55HW.
- Minor pointUB-2026-048 intersected 20.26 g/t gold over 0.60 m within 5.62 g/t over 2.25 m on 276.
- Minor pointBralorne West underground development is advancing, with the first underground diamond drill bay actively infilling the zone.
Negative
- Minor pointTrue structure thicknesses may be 50% to 95% of the apparent thicknesses reported.
News Explained
The company cautions that true thickness of the structures may be
Details
News Market Reaction – TSKFF
On Oct 29, the day this news came out, TSKFF closed 5.56% below the previous close.
Data tracked by StockTitan Argus for the Oct 29 session.
AI-generated analysis. How Rhea-AI works. Not financial advice.
TORONTO, Oct. 29, 2026 (GLOBE NEWSWIRE) -- Talisker Resources Ltd. (“Talisker” or the “Company”) (TSX:TSK | OTCQX:TSKFF) is pleased to announce results from an additional 17 drill holes from the Bralorne West Zone - 2026 Bralorne Gold Project resource conversion program, following the previously reported first 75 drill holes, predominantly targeting dip and strike extensions in the major ore veins at its currently producing Mustang Mine.
Highlights from the additional 17 drill holes include:
- SB-2026-032 - 40.90 g/t Au over 0.70 m within 16.29 g/t Au over 2.15 m on the 101 Vein
- SB-2026-035 - 56.96 g/t Au over 0.80 m within 19.84 g/t Au over 2.30 m on the 55HW Vein
- SB-2026-037 - 58.36 g/t Au over 0.50 m within 12.78 g/t Au over 2.45 m on the 101 Vein
- SB-2026-037 - 33.44 g/t Au over 0.55 m within 9.74 g/t Au over 3.05 m on the 55 Vein
- SB-2026-038 - 32.07 g/t Au over 0.60 m within 8.77 g/t Au over 2.20 m on the 55HW Vein
- UB-2026-046 - 23.78 g/t Au over 1.05 m within 11.10 g/t Au over 2.25 m on the 55HW Vein
- UB-2026-048 - 20.26 g/t Au over 0.60 m within 5.62 g/t Au over 2.25 m on the 276 Vein
- UB-2026-050 - 25.20 g/t Au over 0.55 m within 7.75 g/t Au over 2.10 m on the 55HW Vein
- UB-2026-050 - 15.76 g/t Au over 0.65 m within 9.51 g/t Au over 2.45 m on the 276 Vein
- UB-2026-052 - 38.63 g/t Au over 0.85 m within 15.14 g/t Au over 2.20 m on the 55HW Vein
- UB-2026-054 - 32.46 g/t Au over 0.60 m within 11.25 g/t Au over 2.00 m on the 278 Vein
- UB-2026-058 - 11.90 g/t Au over 0.50 m within 5.72 g/t Au over 2.40 m on the 55HW Vein
- UB-2026-060 - 30.19 g/t Au over 0.55 m within 12.34 g/t Au over 2.45 m on the 55HW Vein
- UB-2026-060 - 301.88 g/t Au over 0.55 m within 79.23 g/t Au over 2.10 m on the 276 Vein
Up to and including data in this news release, the total drilling at the Mustang Mine in 2026 is 25,442 m in 92 drill holes. The resource conversion drill program is focused on infill drilling of the Alhambra, BK, and BK-9870 veins and Bralorne West’s 101, 55 HW, 276, and 55 veins, all within the Mustang Mine. This release highlights results from the Bralorne West zone.
Underground mine development continues to advance in the Bralorne West zone, where the first underground diamond drill bay is now actively infilling the zone. Initial drilling has returned encouraging results, with gold grades exceeding expectations while demonstrating consistent mineralized widths and grade continuity.
Kyle Orr, Talisker's Vice President, Exploration, commented: “We are excited by the initial results from underground drilling in the Bralorne West zone. As underground development advances and drilling continues to expand our understanding of the zone, these results are providing valuable insight into the continuity of mineralization and reinforcing the significant growth potential within the Bralorne Gold Project.”
All drill holes in this release are located in the Mustang Mine and hosted in diorite and/or intermediate to felsic dyke. Major vein structures intersected are orogenic quartz-carbonate veins with banded sulfide septae. Crack-seal septae host fine-grained arsenopyrite and pyrite mineralization. Alteration halos consist of strong silica – sericite ± mariposite alteration with disseminated sulfides.
| Bralorne Gold Project - 2026 Diamond Drilling Top Intercepts Table | |||||
| Drill Hole Name | From (m) | To (m) | Interval (m) | Au (g/t) | Interpreted Structure |
| SB-2026-032 | 44.45 | 45.00 | 0.55 | 0.28 | Vein Halo |
| SB-2026-032 | 45.00 | 46.05 | 1.05 | 1.72 | Vein Halo |
| SB-2026-032 | 46.05 | 46.55 | 0.50 | 5.24 | Untargeted Vein |
| SB-2026-032 | 299.60 | 300.20 | 0.60 | 6.13 | Untargeted Vein |
| SB-2026-032 | 300.20 | 301.00 | 0.80 | 0.53 | Vein Halo |
| SB-2026-032 | 301.00 | 301.60 | 0.60 | 0.03 | Vein Halo |
| SB-2026-032 | 327.00 | 327.65 | 0.65 | 0.01 | Vein Halo |
| SB-2026-032 | 327.65 | 328.30 | 0.65 | 12.50 | Untargeted Vein |
| SB-2026-032 | 328.30 | 329.00 | 0.70 | 0.01 | Vein Halo |
| SB-2026-032 | 348.45 | 349.40 | 0.95 | 6.72 | Vein Halo |
| SB-2026-032 | 349.40 | 349.90 | 0.50 | 0.04 | Vein Halo |
| SB-2026-032 | 349.90 | 350.60 | 0.70 | 40.90 | 101 Vein |
| SB-2026-032 | 401.25 | 402.00 | 0.75 | 13.40 | 55HW Vein |
| SB-2026-032 | 402.00 | 402.50 | 0.50 | 4.39 | 55HW Vein |
| SB-2026-032 | 402.50 | 403.00 | 0.50 | 3.11 | 55HW Vein |
| SB-2026-032 | 403.00 | 403.90 | 0.90 | 2.89 | 55HW Vein |
| SB-2026-033 | 340.05 | 340.55 | 0.50 | 0.86 | Untargeted Vein |
| SB-2026-033 | 340.55 | 341.20 | 0.65 | 0.49 | Vein Halo |
| SB-2026-033 | 341.20 | 341.80 | 0.60 | 2.39 | Vein Halo |
| SB-2026-033 | 341.80 | 342.40 | 0.60 | 11.71 | 101 Vein |
| SB-2026-034 | 267.00 | 267.80 | 0.80 | 3.45 | Vein Halo |
| SB-2026-034 | 267.80 | 268.45 | 0.65 | 2.08 | Vein Halo |
| SB-2026-034 | 268.45 | 268.95 | 0.50 | 2.75 | Vein Halo |
| SB-2026-034 | 268.95 | 269.45 | 0.50 | 5.41 | Untargeted Vein |
| SB-2026-034 | 329.80 | 330.30 | 0.50 | 1.30 | Vein Halo |
| SB-2026-034 | 330.30 | 330.80 | 0.50 | 7.97 | 55HW Vein |
| SB-2026-034 | 330.80 | 331.30 | 0.50 | 1.02 | 55HW Vein |
| SB-2026-034 | 331.30 | 331.80 | 0.50 | 15.07 | 55HW Vein |
| SB-2026-035 | 257.55 | 258.20 | 0.65 | 18.43 | 101 Vein |
| SB-2026-035 | 258.20 | 258.70 | 0.50 | 0.53 | Vein Halo |
| SB-2026-035 | 258.70 | 259.70 | 1.00 | 0.31 | Vein Halo |
| SB-2026-035 | 309.55 | 310.35 | 0.80 | 56.96 | 55HW Vein |
| SB-2026-035 | 310.35 | 310.85 | 0.50 | 0.11 | Vein Halo |
| SB-2026-035 | 310.85 | 311.85 | 1.00 | 0.01 | Vein Halo |
| SB-2026-036 | 366.00 | 366.80 | 0.80 | 4.72 | 55 Splay |
| SB-2026-036 | 366.80 | 367.45 | 0.65 | 8.05 | 55 Splay |
| SB-2026-036 | 367.45 | 368.05 | 0.60 | 2.15 | 55 Splay |
| SB-2026-036 | 374.35 | 375.10 | 0.75 | 2.52 | Vein Halo |
| SB-2026-036 | 375.10 | 376.10 | 1.00 | 3.27 | 55 Vein |
| SB-2026-036 | 376.10 | 376.75 | 0.65 | 7.07 | 55 Vein |
| SB-2026-037 | 262.50 | 263.00 | 0.50 | 1.58 | Vein Halo |
| SB-2026-037 | 263.00 | 263.50 | 0.50 | 58.36 | 101 Vein |
| SB-2026-037 | 263.50 | 264.00 | 0.50 | 0.27 | Vein Halo |
| SB-2026-037 | 264.00 | 264.95 | 0.95 | 1.27 | Vein Halo |
| SB-2026-037 | 331.90 | 332.50 | 0.60 | 3.08 | 55HW Vein |
| SB-2026-037 | 332.50 | 333.00 | 0.50 | 14.03 | 55HW Vein |
| SB-2026-037 | 333.00 | 333.50 | 0.50 | 1.24 | Vein Halo |
| SB-2026-037 | 333.50 | 334.00 | 0.50 | 1.41 | Vein Halo |
| SB-2026-037 | 358.40 | 359.05 | 0.65 | 4.49 | Vein Halo |
| SB-2026-037 | 359.05 | 359.55 | 0.50 | 5.96 | Vein Halo |
| SB-2026-037 | 359.55 | 360.10 | 0.55 | 33.44 | 55 Vein |
| SB-2026-037 | 360.10 | 360.90 | 0.80 | 3.31 | 55 Vein |
| SB-2026-037 | 360.90 | 361.45 | 0.55 | 5.01 | 55 Vein |
| SB-2026-038 | 249.00 | 250.00 | 1.00 | 0.92 | Vein Halo |
| SB-2026-038 | 250.00 | 250.55 | 0.55 | 2.41 | Vein Halo |
| SB-2026-038 | 250.55 | 251.05 | 0.50 | 7.66 | 101 Vein |
| SB-2026-038 | 280.50 | 281.00 | 0.50 | 0.18 | Vein Halo |
| SB-2026-038 | 281.00 | 281.90 | 0.90 | 5.14 | 278 Vein |
| SB-2026-038 | 281.90 | 282.50 | 0.60 | 0.01 | Vein Halo |
| SB-2026-038 | 312.80 | 313.40 | 0.60 | 32.07 | 55HW Vein |
| SB-2026-038 | 313.40 | 313.90 | 0.50 | 0.09 | Vein Halo |
| SB-2026-038 | 313.90 | 315.00 | 1.10 | 0.01 | Vein Halo |
| UB-2026-046 | 53.90 | 54.60 | 0.70 | 0.85 | Vein Halo |
| UB-2026-046 | 54.60 | 55.50 | 0.90 | 5.56 | 101 Vein |
| UB-2026-046 | 55.50 | 56.05 | 0.55 | 0.01 | Vein Halo |
| UB-2026-046 | 123.85 | 124.55 | 0.70 | 0.01 | Vein Halo |
| UB-2026-046 | 124.55 | 125.05 | 0.50 | 0.01 | Vein Halo |
| UB-2026-046 | 125.05 | 126.10 | 1.05 | 23.78 | 55HW Vein |
| UB-2026-048 | 37.00 | 37.60 | 0.60 | 0.31 | Vein Halo |
| UB-2026-048 | 37.60 | 38.15 | 0.55 | 6.56 | Untargeted Vein |
| UB-2026-048 | 38.15 | 38.80 | 0.65 | 0.02 | Untargeted Vein |
| UB-2026-048 | 38.80 | 39.45 | 0.65 | 0.01 | Untargeted Vein |
| UB-2026-048 | 97.30 | 98.20 | 0.90 | 0.01 | Vein Halo |
| UB-2026-048 | 98.20 | 99.05 | 0.85 | 0.01 | Vein Halo |
| UB-2026-048 | 99.05 | 99.60 | 0.55 | 13.04 | 55HW Vein |
| UB-2026-048 | 106.65 | 107.25 | 0.60 | 20.26 | 276 Vein |
| UB-2026-048 | 107.25 | 108.15 | 0.90 | 0.39 | 276 Vein |
| UB-2026-048 | 108.15 | 108.90 | 0.75 | 0.19 | Vein Halo |
| UB-2026-050 | 104.15 | 104.65 | 0.50 | 0.01 | Vein Halo |
| UB-2026-050 | 104.65 | 105.15 | 0.50 | 0.06 | Vein Halo |
| UB-2026-050 | 105.15 | 105.70 | 0.55 | 25.20 | 55HW Vein |
| UB-2026-050 | 105.70 | 106.25 | 0.55 | 4.34 | 55HW Vein |
| UB-2026-050 | 108.20 | 108.70 | 0.50 | 13.20 | Untargeted Vein |
| UB-2026-050 | 108.70 | 109.25 | 0.55 | 0.15 | Vein Halo |
| UB-2026-050 | 109.25 | 110.20 | 0.95 | 0.39 | Vein Halo |
| UB-2026-050 | 113.25 | 113.75 | 0.50 | 2.99 | Vein Halo |
| UB-2026-050 | 113.75 | 114.40 | 0.65 | 15.76 | 276 Vein |
| UB-2026-050 | 114.40 | 115.15 | 0.75 | 14.92 | 276 Vein |
| UB-2026-050 | 115.15 | 115.70 | 0.55 | 0.69 | Vein Halo |
| UB-2026-050 | 144.70 | 145.70 | 1.00 | 1.04 | Vein Halo |
| UB-2026-050 | 145.70 | 146.20 | 0.50 | 0.71 | Vein Halo |
| UB-2026-050 | 146.20 | 147.00 | 0.80 | 7.10 | 55 Vein |
| UB-2026-052 | 113.00 | 113.85 | 0.85 | 38.63 | 55HW Vein |
| UB-2026-052 | 113.85 | 114.50 | 0.65 | 0.17 | Vein Halo |
| UB-2026-052 | 114.50 | 115.20 | 0.70 | 0.52 | Vein Halo |
| UB-2026-052 | 129.85 | 130.35 | 0.50 | 5.13 | 277 Vein |
| UB-2026-052 | 130.35 | 130.90 | 0.55 | 1.89 | Vein Halo |
| UB-2026-052 | 130.90 | 131.90 | 1.00 | 0.50 | Vein Halo |
| UB-2026-054 | 126.65 | 127.25 | 0.60 | 32.46 | 278 Vein |
| UB-2026-054 | 127.25 | 127.75 | 0.50 | 2.09 | Vein Halo |
| UB-2026-054 | 127.75 | 128.65 | 0.90 | 2.19 | Vein Halo |
| UB-2026-055 | 137.95 | 138.65 | 0.70 | 0.21 | Vein Halo |
| UB-2026-055 | 138.65 | 139.55 | 0.90 | 2.54 | 276 Vein |
| UB-2026-055 | 139.55 | 140.10 | 0.55 | 6.08 | 276 Vein |
| UB-2026-057 | 106.70 | 107.20 | 0.50 | 0.03 | Vein Halo |
| UB-2026-057 | 107.20 | 108.15 | 0.95 | 6.70 | 55HW Vein |
| UB-2026-057 | 108.15 | 108.80 | 0.65 | 0.48 | Vein Halo |
| UB-2026-058 | 100.10 | 100.80 | 0.70 | 5.38 | 55HW Vein |
| UB-2026-058 | 100.80 | 101.45 | 0.65 | 6.15 | 55HW Vein |
| UB-2026-058 | 101.45 | 101.95 | 0.50 | 11.90 | 55HW Vein |
| UB-2026-058 | 101.95 | 102.50 | 0.55 | 0.01 | Vein Halo |
| UB-2026-058 | 106.65 | 107.15 | 0.50 | 0.01 | Vein Halo |
| UB-2026-058 | 107.15 | 107.65 | 0.50 | 0.01 | Vein Halo |
| UB-2026-058 | 107.65 | 108.15 | 0.50 | 13.34 | 276 Vein |
| UB-2026-058 | 108.15 | 108.80 | 0.65 | 0.45 | Vein Halo |
| UB-2026-060 | 94.60 | 95.30 | 0.70 | 0.01 | Vein Halo |
| UB-2026-060 | 95.30 | 95.90 | 0.60 | 0.04 | Vein Halo |
| UB-2026-060 | 95.90 | 96.50 | 0.60 | 22.66 | 55HW Vein |
| UB-2026-060 | 96.50 | 97.05 | 0.55 | 30.19 | 55HW Vein |
| UB-2026-060 | 104.15 | 104.65 | 0.50 | 0.05 | Vein Halo |
| UB-2026-060 | 104.65 | 105.20 | 0.55 | 301.88 | 276 Vein |
| UB-2026-060 | 105.20 | 105.70 | 0.50 | 0.66 | Vein Halo |
| UB-2026-060 | 105.70 | 106.25 | 0.55 | 0.01 | Vein Halo |
| UB-2026-062 | 124.60 | 125.15 | 0.55 | 3.70 | 55HW Vein |
| UB-2026-062 | 125.15 | 125.85 | 0.70 | 1.20 | 55HW Vein |
| UB-2026-062 | 125.85 | 126.55 | 0.70 | 0.25 | 55HW Vein |
| UB-2026-062 | 126.55 | 127.05 | 0.50 | 10.23 | 55HW Vein |
| Note: The bolded assay samples in this table have been used for the composite assay values and intervals reported in the Highlights section above and in the cross-section intercept labels below. True thickness of structures in this release may range from | |||||
| Bralorne Gold Project - Drill Collar Locations Table (values rounded to nearest metre) | |||
| Drill Hole Name | UTM Easting | UTM Northing | Elevation (m) |
| SB-2026-032 | 513761 | 5624972 | 1244 |
| SB-2026-033 | 513761 | 5624972 | 1244 |
| SB-2026-034 | 513761 | 5624972 | 1244 |
| SB-2026-035 | 513761 | 5624972 | 1244 |
| SB-2026-036 | 513761 | 5624971 | 1244 |
| SB-2026-037 | 513761 | 5624971 | 1244 |
| SB-2026-038 | 513761 | 5624972 | 1244 |
| UB-2026-046 | 513571 | 5624925 | 1056 |
| UB-2026-048 | 513569 | 5624925 | 1056 |
| UB-2026-050 | 513570 | 5624925 | 1057 |
| UB-2026-052 | 513570 | 5624925 | 1057 |
| UB-2026-054 | 513571 | 5624925 | 1057 |
| UB-2026-055 | 513571 | 5624925 | 1056 |
| UB-2026-057 | 513570 | 5624926 | 1056 |
| UB-2026-058 | 513570 | 5624926 | 1056 |
| UB-2026-060 | 513569 | 5624926 | 1056 |
| UB-2026-062 | 513571 | 5624926 | 1056 |
| Bralorne Gold Project - Drill Collar Orientations Table (negative dip points down from the horizontal) | |||
| Drill Hole Name | Azimuth (°) | Dip (°) | Total Depth (m) |
| SB-2026-032 | 146.50 | -47.50 | 408.00 |
| SB-2026-033 | 151.50 | -47.80 | 389.10 |
| SB-2026-034 | 159.00 | -49.90 | 348.00 |
| SB-2026-035 | 159.50 | -45.00 | 348.30 |
| SB-2026-036 | 162.00 | -53.70 | 402.00 |
| SB-2026-037 | 162.50 | -50.00 | 390.00 |
| SB-2026-038 | 164.50 | -47.50 | 345.00 |
| UB-2026-046 | 153.80 | -1.25 | 192.00 |
| UB-2026-048 | 189.00 | 5.00 | 141.00 |
| UB-2026-050 | 178.80 | 7.00 | 147.00 |
| UB-2026-052 | 169.50 | 7.50 | 150.00 |
| UB-2026-054 | 157.40 | 9.40 | 156.00 |
| UB-2026-055 | 162.00 | -1.00 | 156.00 |
| UB-2026-057 | 171.00 | -1.50 | 177.30 |
| UB-2026-058 | 182.50 | -2.20 | 177.00 |
| UB-2026-060 | 192.70 | -3.10 | 171.00 |
| UB-2026-062 | 156.60 | -9.40 | 201.00 |
A Media Snippet accompanying this announcement is available by clicking on this link.
In other news, Talisker has entered into a definitive agreement to acquire all of the outstanding securities of Midex Resources Ltd. (“Midex”) by way of a three-cornered amalgamation (the “Transaction”). Midex is a private junior exploration company focused on gold properties in Ontario. Midex’s main project is the 45,000 hectare,
Terry Harbort, CEO of Talisker, commented, “The acquisition of Midex brings several highly prospective land packages into the Talisker portfolio and bolsters our long-term growth strategy. Berens in particular shows distinct structural analogies with our Bralorne Gold Project and with significant historic production only coming from one of 20 identified veins, we see significant exploration upside in the future.”
For further information, please contact:
Lindsay Dunlop
Vice President, Investor Relations
lindsay.dunlop@taliskerresources.com
+1 647 274 8975
Qualified Person
The scientific and technical information contained in this news release in relation to the Bralorne Gold Project has been reviewed and approved by Kyle Orr, P.Geo., Vice President, Exploration of Talisker, who is a “Qualified Person” as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects. Mr. Orr is not independent of the Company for the purposes of NI 43-101.
The scientific and technical information contained in this news release regarding historical mine production at Berens River Mine is based solely on reports prepared by prior operators. Kyle Orr, P.Geo, in his capacity as a Qualified Person, has not performed the work or independent data verification necessary to confirm the accuracy or completeness of these historical production figures. Readers are cautioned that this data has not been verified by a Qualified Person and should not place undue reliance on these historical figures.
About Talisker Resources Ltd.
Talisker (taliskerresources.com) is a junior resource company involved in the exploration and development of gold projects in British Columbia, Canada. Talisker’s flagship asset is the high-grade, fully permitted Bralorne Gold Project where the Company is producing at the Mustang Mine. Talisker projects also include the Ladner Gold Project, an historic gold producer with significant exploration potential and the Spences Bridge Project where the Company has a significant landholding in the emerging Spences Bridge Gold Belt, and several other early-stage Greenfields projects.
Sample Preparation and QAQC
Drill core in this new release from the Bralorne Gold Project was drilled in NQ size (47.6mm) or HQ size (63.5mm) diameters. Drill core samples are a minimum of 50 cm and a maximum of 150 cm long along the core axis. Samples are focused on an interval of interest, such as a vein or zone of mineralization. Shoulder samples bracket the interval of interest such that a total sampled core length of not less than 3m both above and below the interval of interest must be assigned. Sample QAQC measures of unmarked certified reference materials (CRMs), blanks, and duplicates are inserted into the sample sequence and makeup
Caution Regarding Forward Looking Statements
Certain statements contained in this press release constitute forward-looking information. The use of any of the words “could”, “intend”, “expect”, “believe”, “will”, “projected”, “estimated” and similar expressions and statements relating to matters that are not historical facts are intended to identify forward-looking information and are based on Talisker’s current belief or assumptions as to the outcome and timing of such future events. Various assumptions or factors are typically applied in drawing conclusions or making the forecasts or projections set out in forward-looking information. Those assumptions and factors are based on information currently available to Talisker. Although such statements are based on reasonable assumptions of Talisker’s management, there can be no assurance that any conclusions or forecasts will prove to be accurate.
Forward looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include risks inherent in the exploration and development of mineral deposits, including risks relating to changes in project parameters as plans continue to be redefined, risks relating to variations in grade or recovery rates, risks relating to changes in mineral prices and the worldwide demand for and supply of minerals, risks related to increased competition and current global financial conditions, access and supply risks, reliance on key personnel, operational risks, regulatory risks, including risks relating to the acquisition of the necessary licenses and permits, financing, capitalization and liquidity risks, title and environmental risks and risks relating to the failure to receive all requisite shareholder and regulatory approvals.
The forward-looking information contained in this release is made as of the date hereof, and Talisker is not obligated to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by applicable securities laws. Because of the risks, uncertainties and assumptions contained herein, investors should not place undue reliance on forward-looking information. The foregoing statements expressly qualify any forward-looking information contained herein.
_____________________________________________
1 https://www.geologyontario.mines.gov.on.ca/mineral-inventory/MDI53C13SE00077
FAQ
AI-generated questions and answers. How Rhea-AI works. Not financial advice.
What was Talisker Resources' highest-grade Bralorne West drilling result?
Hole UB-2026-060 intersected 301.88 grams of gold per tonne over 0.55 metres within 79.23 grams per tonne over 2.10 metres on the 276 Vein at Mustang Mine.
Are Talisker Resources' Bralorne West drill intervals true thicknesses?
True thicknesses of the structures may range from 50% to 95% of the reported apparent thicknesses.
Which veins does Talisker Resources' Mustang resource conversion drilling target?
The resource conversion program focuses on infill drilling of the Alhambra, BK and BK-9870 veins, together with Bralorne West's 101, 55 HW, 276 and 55 veins. All are within Mustang Mine.
