Talisker Receives Assay Results from 1075 Level Lateral Development at the Mustang Mine
Talisker Resources (OTCQX: TSKFF) has announced significant assay results from underground face sampling at its Mustang Mine's 1075 level. The company reported multiple high-grade gold intersections, with the most notable result being 60.5 g/t gold over 0.57m within 8.8 g/t over 4.01m from the Alhambra Vein.
Development continues across multiple veins on the 1060, 1105, and 1120 levels. The results demonstrate strong grade continuity between the 1075 and 1105 levels, with potential to extend high-grade shoots over 60 meters vertically. The company expects to release additional sampling results from the 1060 and 1120 levels.
Talisker Resources (OTCQX: TSKFF) ha annunciato risultati significativi da analisi di campioni prelevati nelle gallerie sotterranee al livello 1075 della sua miniera Mustang. L'azienda ha riportato molteplici intersezioni di oro ad alta concentrazione, con il risultato più rilevante di 60,5 g/t di oro su 0,57 m all'interno di 8,8 g/t su 4,01 m dalla vena Alhambra.
Lo sviluppo continua su più vene ai livelli 1060, 1105 e 1120. I risultati mostrano una forte continuità di concentrazione tra i livelli 1075 e 1105, con il potenziale di estendere i filoni ad alta concentrazione per oltre 60 metri in verticale. L'azienda prevede di pubblicare ulteriori risultati di campionamento dai livelli 1060 e 1120.
Talisker Resources (OTCQX: TSKFF) ha anunciado resultados significativos de ensayos en muestreos de frente subterráneo en el nivel 1075 de su mina Mustang. La compañía reportó múltiples intersecciones de oro de alta ley, destacando 60,5 g/t de oro sobre 0,57 m dentro de 8,8 g/t sobre 4,01 m de la veta Alhambra.
El desarrollo continúa en varias vetas en los niveles 1060, 1105 y 1120. Los resultados demuestran una fuerte continuidad de ley entre los niveles 1075 y 1105, con potencial para extender los filones de alta ley más de 60 metros en vertical. La empresa espera publicar resultados adicionales de muestreo de los niveles 1060 y 1120.
Talisker Resources (OTCQX: TSKFF)는 Mustang 광산 1075층 지하 갱도 시추 샘플링에서 중요한 분석 결과를 발표했습니다. 회사는 여러 고품위 금 교차 구간을 보고했으며, 가장 주목할 만한 결과는 Alhambra 광맥에서 0.57m 구간에서 60.5 g/t 금, 그 안에 4.01m 구간에서 8.8 g/t 금입니다.
1060, 1105, 1120층 여러 광맥에서 개발 작업이 계속 진행 중입니다. 결과는 1075층과 1105층 사이에 강한 품위 연속성을 보여주며, 고품위 광맥이 수직으로 60미터 이상 확장될 가능성을 시사합니다. 회사는 1060층과 1120층의 추가 샘플링 결과도 곧 발표할 예정입니다.
Talisker Resources (OTCQX : TSKFF) a annoncé des résultats d'analyses significatifs issus d'échantillonnages en galerie souterraine au niveau 1075 de sa mine Mustang. La société a rapporté plusieurs intersections aurifères à haute teneur, le résultat le plus notable étant 60,5 g/t d'or sur 0,57 m à l'intérieur de 8,8 g/t sur 4,01 m provenant du filon Alhambra.
Le développement se poursuit sur plusieurs filons aux niveaux 1060, 1105 et 1120. Les résultats démontrent une forte continuité des teneurs entre les niveaux 1075 et 1105, avec un potentiel d'extension des zones à haute teneur sur plus de 60 mètres en vertical. La société prévoit de publier prochainement des résultats d'échantillonnage supplémentaires des niveaux 1060 et 1120.
Talisker Resources (OTCQX: TSKFF) hat bedeutende Analyseergebnisse von Probenahmen an der unterirdischen Abbaufront auf der 1075-Ebene seiner Mustang-Mine bekanntgegeben. Das Unternehmen meldete mehrere hochgradige Goldabschnitte, wobei das bemerkenswerteste Ergebnis 60,5 g/t Gold über 0,57 m innerhalb von 8,8 g/t über 4,01 m aus dem Alhambra-Gang war.
Die Entwicklung schreitet an mehreren Gängen auf den Ebenen 1060, 1105 und 1120 voran. Die Ergebnisse zeigen eine starke Kontinuität der Gehalte zwischen den Ebenen 1075 und 1105 mit dem Potenzial, hochgradige Abschnitte über 60 Meter vertikal zu verlängern. Das Unternehmen erwartet die Veröffentlichung weiterer Probenergebnisse von den Ebenen 1060 und 1120.
- Multiple high-grade gold intersections with peak values of 60.5 g/t gold
- Strong grade continuity confirmed between different mine levels
- Development progressing simultaneously across multiple veins
- Potential extension of high-grade shoots over 60 meters vertically
- None.
TORONTO, Aug. 07, 2025 (GLOBE NEWSWIRE) -- Talisker Resources Ltd. (“Talisker” or the “Company”) (TSX: TSK, OTCQX: TSKFF) is pleased to announce that the Company has received additional assay results from underground face sampling of lateral development from the 1075 level at the Mustang Mine. In-vein development continues in multiple veins on the 1060, 1105 and 1120 levels above and below the 1075.
Key Highlights:
- 60.5 g/t over 0.57m within 8.8 g/t over 4.01m from Alhambra Vein, West Face No. 23 (sample X000831)
- 46.4 g/t over 0.46m and 45.2 g/t over 0.49m within 17.2 g/t over 2.64m from Alhambra Vein, East Face No. 2 (samples X000388, X000389)
- 44.7 g/t over 0.66m within 10.7 g/t over 3.08m from Alhambra Vein, West Face No. 22 (sample X000822)
- 38.7 g/t over 0.67m within 8.5 g/t over 3.21m from Alhambra Vein, West Face No. 2 (sample X000355)
- 37.8 g/t over 0.9m and 24.3 g/t over 0.53m within 13.8 g/t over 3.45m from Alhambra Vein, East Face No. 3 (samples X000411, X000412)
- 30.3 g/t over 0.77m within 8.5 g/t over 2.85m from Alhambra Vein, East Face No. 1 (sample X000348)
- 26.7 g/t over 0.78m within 6.7 g/t over 3.38m from Alhambra Vein, West Face No. 1 (sample X000344)
- 25.2 g/t over 0.92m within 6.7 g/t over 4.02m from BK9870 Vein, West Face No. 1 (sample X002237)
- 23.4 g/t over 0.88m within 5.8 g/t over 3.58m from Alhambra Vein, East Face No. 5 (sample X000437)
- 21.7 g/t over 0.38m and 10.6 g/t over 0.46 m within 5.56 g/t over 3m from Alhambra Vein, West Face No. 15 (samples X000554, X000556)
Terry Harbort, CEO of Talisker stated, “This next round of impressive results, taken mostly on Alhambra Vein from the 1075 level confirm excellent down plunge continuity from the previous release and show strong support for the grade of the defined stopes between the 1075 and 1105 levels. We expect to be releasing further down plunge face samples from the 1060 level below and up plunge sampling on the 1120 level potentially extending these spectacular high-grade shoots to over 60m vertically.”
Bralorne Gold Project Mustang Ming –1075 Lateral Development Assay Results * | |||||||||
Channel Sample Name | From (m) | To (m) | Length (m) | Au (ppm) | Comp Grade | Comp Length | Sample # | ||
M1075_Alh_OD_W1_F23 | 1.82 | 2.39 | 0.57 | 60.5 | 8.8094 | 4.01 | X000831 | ||
M1075_Alh_OD_E1_F2 | 1.45 | 1.91 | 0.46 | 46.4 | 17.1506 | 2.64 | X000389 | ||
M1075_Alh_OD_E1_F2 | 0.96 | 1.45 | 0.49 | 45.2 | 17.1506 | 2.64 | X000388 | ||
M1075_Alh_OD_W1_F22 | 1.44 | 2.1 | 0.66 | 44.7 | 10.7415 | 3.08 | X000822 | ||
M1075_Alh_OD_W1_F2 | 1.81 | 2.48 | 0.67 | 38.7 | 8.4546 | 3.21 | X000355 | ||
M1075_Alh_OD_E1_F3 | 1.14 | 2.04 | 0.9 | 37.8 | 13.7994 | 3.45 | X000411 | ||
M1075_Alh_OD_E1_F1 | 0.97 | 1.74 | 0.77 | 30.3 | 8.5399 | 2.85 | X000348 | ||
M1075_Alh_OD_W1_F1 | 2.17 | 2.95 | 0.78 | 26.7 | 6.6976 | 3.38 | X000344 | ||
M1075_BK9870_OD_W1_F1 | 0.63 | 1.55 | 0.92 | 25.2 | 6.6648 | 4.02 | X002237 | ||
M1075_Alh_OD_E1_F3 | 2.04 | 2.57 | 0.53 | 24.3 | 13.7994 | 3.45 | X000412 | ||
M1075_Alh_OD_E1_F5 | 0.89 | 1.77 | 0.88 | 23.4 | 5.7948 | 3.58 | X000437 | ||
M1075_Alh_OD_W1_F15 | 1.64 | 2.02 | 0.38 | 21.7 | 5.5623 | 3 | X000556 | ||
M1075_Alh_OD_E1_F10 | 1.59 | 2.19 | 0.6 | 18.4 | 3.4215 | 3.59 | X000482 | ||
M1075_Alh_OD_W1_F12 | 1.05 | 1.64 | 0.59 | 17.2 | 3.1036 | 3.4 | X000534 | ||
M1075_Alh_OD_E1_F4 | 1.03 | 1.79 | 0.76 | 13.3 | 3.175 | 3.23 | X000427 | ||
M1075_Alh_OD_W1_F14 | 1.4 | 1.9 | 0.5 | 10.6 | 2.1347 | 3.07 | X000549 | ||
M1075_Alh_OD_W1_F15 | 0.51 | 0.97 | 0.46 | 10.6 | 5.5623 | 3 | X000554 | ||
M1075_Alh_OD_W1_F16 | 1.82 | 2.3 | 0.48 | 9.08 | 3.6084 | 3.05 | X000562 | ||
* Estimated true widths are between | |||||||||
A Media Snippet accompanying this announcement is available by clicking on this link.
For further information, please contact:
Terry Harbort
President and CEO
terry.harbort@taliskerresources.com
+1 416 357 0227
Qualified Person
The technical information contained in this news release relating to the drill results at the Bralorne Gold Project has been approved by Leonardo de Souza (BSc, AusIMM (CP) Membership 224827), Talisker’s Vice President, Exploration and Resource Development, who is a “qualified person” within the meaning of National Instrument 43-101, Standards of Disclosure for Mineral Projects.
About Talisker Resources Ltd.
Talisker (taliskerresources.com) is a junior resource company involved in the exploration and development of gold projects in British Columbia, Canada. Talisker’s flagship asset is the high-grade, fully permitted Bralorne Gold Project where the Company is currently transitioning into underground production at the Mustang Mine. Talisker projects also include the Ladner Gold Project, an advanced stage project with significant exploration potential from an historical high-grade producing gold mine and the Spences Bridge Project where the Company holds ~
Sample Preparation and QAQC
Drill core at the Bralorne Gold Project is drilled in HQ to NQ size ranges (63.5mm and 47.6mm, respectively). Drill core samples are a minimum of 50 cm and a maximum of 160 cm long along the core axis. Samples are focused on an interval of interest, such as a vein or zone of mineralization. Shoulder samples bracket the interval of interest such that a total sampled core length of not less than 3m both above and below the interval of interest must be assigned. Sample QAQC measures of unmarked certified reference materials (CRMs), blanks, and duplicates are inserted into the sample sequence and makeup
Caution Regarding Forward Looking Statements
Certain statements contained in this press release constitute forward-looking information. These statements relate to future events or future performance. The use of any of the words “could”, “intend”, “expect”, “believe”, “will”, “projected”, “estimated” and similar expressions and statements relating to matters that are not historical facts are intended to identify forward-looking information and are based on Talisker’s current belief or assumptions as to the outcome and timing of such future events. Various assumptions or factors are typically applied in drawing conclusions or making the forecasts or projections set out in forward-looking information. Those assumptions and factors are based on information currently available to Talisker. Although such statements are based on reasonable assumptions of Talisker’s management, there can be no assurance that any conclusions or forecasts will prove to be accurate.
Forward looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include risks inherent in the exploration and development of mineral deposits, including risks relating to changes in project parameters as plans continue to be redefined, risks relating to variations in grade or recovery rates, risks relating to changes in mineral prices and the worldwide demand for and supply of minerals, risks related to increased competition and current global financial conditions, access and supply risks, reliance on key personnel, operational risks regulatory risks, including risks relating to the acquisition of the necessary licenses and permits, financing, capitalization and liquidity risks, title and environmental risks and risks relating to the failure to receive all requisite shareholder and regulatory approvals.
The forward-looking information contained in this release is made as of the date hereof, and Talisker is not obligated to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by applicable securities laws. Because of the risks, uncertainties and assumptions contained herein, investors should not place undue reliance on forward-looking information. The foregoing statements expressly qualify any forward-looking information contained herein.
