STOCK TITAN

High-IRR PEA outlines Anfield Energy (NASDAQ: AEC) uranium-vanadium plan

Filing Impact
(Neutral)
Filing Sentiment
(Neutral)
Form Type
6-K

Rhea-AI Filing Summary

Anfield Energy Inc. has filed an updated preliminary economic assessment for its hub-and-spoke uranium and vanadium strategy centered on the Shootaring Canyon Mill. The PEA outlines a pre-tax internal rate of return of 106% and pre-tax net present value of US$606 million, based on uranium at US$100 per pound and vanadium at US$9 per pound, with a post-tax IRR of 97% and NPV of US$533 million.

The study estimates average annual production of about 1.3 million pounds of U3O8 and 6.4 million pounds of V2O5 over a 15-year mine life, using feed from Velvet-Wood, Slick Rock and six West Slope mines to supply the refurbished Shootaring mill at 1,000 tons per day. Initial pre-production capital is forecast at roughly US$97 million, with total life-of-mine capital of US$173 million. Anfield emphasizes that the PEA is preliminary, relies partly on inferred resources, and does not demonstrate economic viability.

Positive

  • None.

Negative

  • None.

Insights

Updated PEA shows robust modeled economics but remains early stage.

The combined Utah and Colorado projects feeding the Shootaring mill are modeled to generate a pre-tax IRR of 106% and NPV of US$606 million at US$100/lb uranium and US$9/lb vanadium, over a 15-year mine life.

Average annual output of roughly 1.3 million pounds U3O8 and 6.4 million pounds V2O5 is supported by initial and sustaining capital totaling about US$173 million. Sensitivity work shows NPV and IRR move materially with a 10% change in commodity prices, underlining the project’s exposure to uranium and vanadium markets.

The company clearly states this is a preliminary economic assessment that incorporates inferred mineral resources, which do not have demonstrated economic viability. Actual outcomes depend on further studies, permitting, financing and market conditions as described in the technical report and risk disclosures.

Pre-tax IRR 106% Project internal rate of return at US$100/lb U3O8 and US$9/lb V2O5
Pre-tax NPV US$606 million NPV at 8% discount rate using PEA price assumptions
Post-tax NPV US$533 million Post-tax net present value at 8% discount rate
Average annual U3O8 production 1.3 million pounds per year Modeled output over 15-year mine life
Average annual V2O5 production 6.4 million pounds per year Modeled output over 15-year mine life
Initial pre-production capital US$97 million Estimated 12-month pre-production period including contingencies
Life-of-mine capital US$173 million Total costs including sustaining capital
Shootaring mill capex US$80.1 million General upgrades, vanadium circuit and tailings facility with contingencies
preliminary economic assessment financial
"Anfield Energy Files Its Updated Preliminary Economic Assessment Which Reflects its Robust Hub-And-Spoke Uranium and Vanadium Production Strategy"
A preliminary economic assessment is an initial analysis that estimates the potential profitability and feasibility of a project or resource, such as a new mineral deposit or development venture. It provides a rough idea of costs, benefits, and risks, helping investors decide whether to pursue more detailed studies. This early evaluation is important because it offers a snapshot of whether the project is worth further investment and development.
internal rate of return financial
"The updated PEA indicates a pre-tax project internal rate of return (“IRR”) of 106%"
A percentage that represents the annualized yield an investment would earn, taking into account the timing and amount of all cash inflows and outflows; mathematically it is the rate that makes the discounted sum of future cash flows equal the initial cost. Investors use it to compare different projects or deals the way they compare interest rates — a higher internal rate of return suggests a stronger potential payoff, but it does not by itself show risk, scale, or timing nuances.
net present value financial
"and a net present value (“NPV”) of US$606 million"
Net present value is a way to measure the value of a future amount of money today. It considers how money available in the future is worth less than money now because of potential earning opportunities or inflation. Investors use it to decide whether an investment is worthwhile, aiming for projects with positive net present value, meaning they are expected to generate more value than they cost.
National Instrument 43-101 regulatory
"The PEA was prepared in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects"
National Instrument 43-101 is a set of rules and guidelines that govern how mineral exploration and mining companies must report information about their projects. It ensures that the details shared with investors are accurate, consistent, and reliable—similar to how a detailed, verified blueprint ensures a building’s safety. This helps investors make informed decisions based on trustworthy information about a company's mineral resources.
inferred mineral resources financial
"The PEA is preliminary in nature such that it includes a portion of the inferred mineral resources."
An inferred mineral resource is an estimate of the quantity and grade of minerals in the ground based on limited sampling and geological information, where confidence is low and continuity is uncertain. For investors it signals potential value but also higher risk—like a rough sketch of a hidden treasure that requires much more exploration and testing before you can reliably judge its size or economic worth.
sustaining capital financial
"The total costs for “Life of Mine” is estimated at US$173 million, including sustaining capital."
Sustaining capital is the ongoing spending a company must make to keep its existing assets, equipment and operations running at current levels — for example repairs, routine replacements and meeting safety or regulatory requirements. Investors care because these are recurring, non‑optional costs that reduce free cash flow available for dividends, debt repayment or growth; think of it as the routine maintenance you must pay to keep a car roadworthy rather than money spent to buy a new model.
See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google
 

UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

Form 6-K

REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16 UNDER THE SECURITIES EXCHANGE ACT OF 1934

For the month of June 2026

Commission File Number: 001-42808

Anfield Energy Inc.
(Translation of registrant's name into English)

2005-4390 Grange Street, Burnaby, British Columbia, Canada, V5H 1P6
(Address of principal executive office)

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.
Form 20-F [   ]      Form 40-F [ X ]

 

 


SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

      Anfield Energy Inc.    
  (Registrant)
   
  
Date: June 18, 2026     /s/ Corey Dias    
  Corey Dias
  Chief Executive Officer
  


EXHIBIT INDEX 

Exhibit Number Description
   
99.1 Press Release dated June 18, 2026

EXHIBIT 99.1

Anfield Energy Files Its Updated Preliminary Economic Assessment Which Reflects its Robust Hub-And-Spoke Uranium and Vanadium Production Strategy

VANCOUVER, British Columbia, June 18, 2026 (GLOBE NEWSWIRE) -- Anfield Energy Inc. (NASDAQ: AEC; TSX.V: AEC; FRANKFURT: 0AD) (“Anfield” or the “Company”), following its May 4th news release, is pleased to report that is has filed its combined preliminary economic assessment (“PEA”) titled, “The Shootaring Canyon Mill and Tributary Mines, Utah and Colorado, USA, Preliminary Economic Assessment” on SEDAR+. The PEA incorporates its Utah-based Velvet-Wood uranium and vanadium project (“Velvet-Wood”), its Colorado-based Slick Rock uranium and vanadium project (“Slick Rock”) and six of the nine mines which comprise the West Slope complex (“West Slope Mines”). These eight projects, being Velvet-Wood, Slick Rock and the West Slope Mines, are located proximal to one another within the prolific Uravan Mineral Belt, and within close distance of the Company’s Shootaring Canyon Mill (“Shootaring”) which will act as a centralized mineral processing facility in the PEA. The PEA was prepared in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”).

Highlights include:

  • The updated PEA indicates a pre-tax project internal rate of return (“IRR”) of 106% and a net present value (“NPV”) of US$606 million (with a post-tax IRR of 97% and NPV of $533 million), based on a discount rate of 8% and a uranium price of US$100 per pound, along with a vanadium price of US$9 per pound, with an expected mine and mill capex payback period of 1.3 years.
  • Average annual production of approximately 1.3 million pounds of uranium (U3O8) and 6.4 million pounds of vanadium (V2O5) per year is estimated over the 15-year mine life, including a peak production year of 1.9 million pounds of uranium and 7.8 million pounds of vanadium.
  • The combined feed of the Velvet-Wood, Slick Rock and the West Slope Mines is designed to meet the increased tonnage capacity at Shootaring of 1,000 tons per day.
  • Estimated mill-related capital expenditures at Shootaring, including 20% contingency amount for each item, of: (1) US$31.1 million for general upgrades; (2) US$34.6 million to install a modern vanadium circuit; and (3) US$14.4 million to update the tailings management facility, for a total of US$80.1 million.

  • Estimated mine-related capital expenditures, including: (1) engineering and design; (2) mine facilities; (3) mine equipment; (4) the reopening of the decline at Velvet and the sinking of a production shaft at Wood; and (5) the sinking of two production shafts at Slick Rock, with a 10% contingency, of a combined total of US$37.5 million, partially offset by expected cash flow of approximately $23.2 million related to initial uranium production from Anfield’s stockpiled material.

Anfield CEO, Corey Dias, stated, “Once again, we are very pleased with the outcome of this updated PEA as it provides Anfield with strong further evidence of the true value of the combination of Velvet-Wood, Slick Rock and the West Slope mines within Anfield’s uranium and vanadium hub-and-spoke production model.

Critically, the future potential addition of the Company’s thirteen remaining U.S. Department of Energy leases (“DOE Leases”) to Anfield’s production model pipeline - which will require little incremental capital expenditure - provides significant valuation upside, especially given that Shootaring’s restart costs will have already been borne by initial production from the Velvet-Wood, Slick Rock and West Slope mines. Moreover, the prospect of our largest single uranium mine – Marquez-Juan Tafoya – as an additional source of uranium could further extend the production timeline or provide an incentive to once again expand throughput capacity at Shootaring.

The prospect of Shootaring becoming the second of only two operational conventional uranium and vanadium mills in the United States is significant both economically as well as with respect to security of supply for utilities. This PEA not only represents a significant milestone for Anfield but also outlines a technical and economic path towards commercial development of its core uranium and vanadium assets. Finally, the Company is currently reviewing a number of other value-added techniques and technologies to facilitate the reduction of waste in order to improve uranium and vanadium grades which can provide the Company with an opportunity to further improve annual production output.

Anfield is well-positioned to benefit from an improving uranium market as nuclear energy becomes critically needed for data centres in the U.S. and as nuclear energy becomes a more integral part of the global transition towards electrification.”

Project Economics

The PEA provides for a 12-month pre-production period. This includes the following capital expenditures, forecasted at approximately US$97 million (including a 20% contingency): (1) initial mill and mine permitting and licensing; (2) an updated mining and reclamation plan; (3) initiation of mine development; (4) completion of the construction of mine facilities and purchasing of equipment; (5) refurbishment of the Shootaring uranium circuit and the construction of a vanadium circuit; and (6) the updating of the tailings waste management facility. An additional US$20 million of mine-related expenditures will occur during the initial production year. The total costs for “Life of Mine” is estimated at US$173 million, including sustaining capital.

The PEA indicates a pre-tax IRR of 106% at a uranium price of US$100 per pound and US$9 per pound of vanadium. The pre-tax NPV of the project at an 8% discount rate at the aforementioned prices is US$606 million. The PEA also indicates a post-tax IRR of 97% and a pre-tax NPV of $533 million.

Sensitivity to commodity prices

Changing the commodity price for uranium and vanadium equally by 10% varies the NPV@8% approximately +/- US$136 million pre-tax, and +/- US$117 million post-tax. In both pre-tax and post-tax scenarios the IRR varies by approximately 20% with a 10% variation in price.

Sensitivity to Commodity Price and Discount Rate


NPV: Sensitivity to Uranium Price


NPV: Sensitivity to Vanadium Price


Source: BRS

Shootaring Mill

The Shootaring area covers approximately 265 acres of surface ownership and approximately 905 acres of mineral leases.

Shootaring was licensed and constructed by Plateau Resources Limited and operated in 1982. U.S. Energy Corp. and Uranium One Inc. were also previous owners of Shootaring. Shootaring has not been decommissioned and has been under care and maintenance since cessation of operations. The mill license has been maintained and Anfield is currently conducting engineering and design studies for both the refurbishment of Shootaring and tailings facility in support of converting the license from its status of care and maintenance to operations.

Velvet-Wood

Velvet-Wood covers approximately 2,140 acres, including unpatented mining claims and a State of Utah mineral lease related to the Velvet-Wood mine areas comprising Velvet-Wood.

Between 1979 and 1984, Atlas Minerals mined approximately 400,000 tons of ore from the Velvet deposit at grades of 0.46% U3O8 and 0.64% V2O5, recovering approximately 4.0 million pounds of U3O8 and 5.0 million pounds of V2O5.

The current mineral resources of the combined Velvet and Wood historical mines have been estimated to comprise 0.63 million tons containing 4.3 million pounds of eU3O8, at a grade of 0.34% eU3O8 (measured and indicated mineral resource), and 80,000 tons containing 544,000 pounds of eU3O8, at a grade of 0.34% U3O8 (inferred mineral resource) with a vanadium-to-uranium ratio of 1.4 to 1.

Surface Stockpiles

In addition to the estimated mineral resource at Velvet-Wood, Anfield controls mineralized stockpiles from past mining at two locations: (1) one stockpile at the Patty Ann mine area near the historic Velvet mine; and (2) several stockpiles near Shootaring. The volumes and uranium content of the stockpiles were estimated from volumetric surveys and sampling conducted by BRS Inc. (“BRS”) in March, 2015. The PEA includes the stockpiles located near Shootaring only. In total these stockpiles are estimated to contain approximately 77,500 tons of material at an average grade of 0.16% U3O8 and contain approximately 250,000 pounds of uranium.

Slick Rock

Slick Rock Complex is located in the Uravan Mineral Belt region of Colorado and covers approximately 6,130 acres, including 293 unpatented mining lodes claims, and two DOE Leases. The PEA estimates 0.8 million pounds of eU3O8, at a grade of 0.16% eU3O8 (indicated mineral resource) and 2.25 million tons containing 9.1 million pounds at a grade of 0.20% U3O8 (inferred mineral resource) with a vanadium-to-uranium-ratio of 6 to 1.

JD-6, JD-7, JD-8 and JD-9

The JD Mines, located in Colorado, represent four of the nine West Slope mines acquired from Cotter Corporation in late 2018. The PEA estimates 4.6 million pounds of eU3O8, at a grade of 0.22% eU3O8 (indicated mineral resource) with a vanadium-to-uranium-ratio of 5 to 1.

SR-11 and SM-18

The SR-11 and SM-18 mines, located in Colorado, represent two of the nine West Slope mines acquired from Cotter Corporation in late 2018. The PEA estimates 0.16 million tons containing 0.7 million pounds at a grade of 0.24% U3O8 (inferred mineral resource) with a vanadium-to-uranium-ratio of 6 to 1 for SR-11 and 0.18 million tons containing .7 million pounds at a grade of 0.21% U3O8 (inferred mineral resource) with a vanadium-to-uranium-ratio of 5 to 1 for SM-18. Please see resource disclosure for both SR-11 and SM-18 in section titled Mineral Resource Estimate below.

Mineral Resource Estimate

The PEA is based on the mineral resource estimates set forth in the Company’s previous technical reports titled “US DOE Uranium/Vanadium Leases JD-6, JD-7, JD-8 and JD-9, Montrose County, Colorado, USA, Mineral Resource Technical Report, National Instrument 43-101” dated effective April 10, 2022 and “The Shootaring Canyon Mill and Velvet-Wood and Slick Rock Uranium Projects, Preliminary Economic Assessment National Instrument 43-101” dated effective May 6, 2023. There has been no material change in such mineral resource estimates for the Velvet-Wood, Slick Rock, Shootaring and the JD Mines. For the purpose of this PEA, the mineral resource estimates were reviewed by the qualified persons under the PEA and deemed to remain valid and effective.

SR-11 Project Resource Estimate

The SR-11 Project is located approximately 8 miles southwest of the Slick Rock Complex and includes the SR-11 DOE Lease. This lease was previously held and operated by Cotter Corporation into the Mid 2000s. This is the initial resource estimate for the property performed by Anfield.  The data set acquired from Cotter Corporation was validated using existing and available geophysical logs. Drilling density would otherwise justify a higher resource classification. However, more field validation of historic drill hole locations or new confirmatory drilling is needed to raise the classification above Inferred.

The existing data for SR-11 consists of 741 drill collars, of which 605 drill holes had associated grade and thickness data. The 136 drill holes without data were limited to the margins of the SR-11 resource area and thus are considered by the authors to have low impact on the data set overall. GT Contour modeling was performed using under the key assumptions described in the table below, and was performed at 0.1ft%, 0.3ft% and 0.5 ft% eU3O8 GT cutoffs for sensitivity analysis. Nominal minimum thickness at the 0.4 ft% GT cutoff is 4 feet. However, lower GT cutoffs would reduce the nominal mining thickness to closer 3ft. Meaning that Jack Leg, room and pillar mining would likely dominate the method of extraction of the SR-11 resource.

The minimum sum GT contour resource model cutoff is the primary cutoff criteria applied to the contour model volume as the initial screening of those portions of the model quantities not meeting the criteria for reasonable economic extraction. In addition, individual model areas outside the conceptual mine limits not meeting a minimum of 10,000 lbs of eU3O8 resource were excluded from the resource totals as not meeting a minimum expectation of reasonable economic extraction. It is the opinion of the authors of the PEA that the resource models are reasonably valid within the mineral resource classifications assigned to each area of the complex.

A sensitivity analysis was performed on the mineral resource models for each zone as shown in the table below. The authors recommend the 0.40 GT cutoff for the SR-11 Project. With further definition of the mineral resource via drilling and additional mine design and cost evaluation, it is the authors’ opinion that the minimum GT cutoff may be lowered with appropriate adjustments to mining methods made.

Inferred Mineral Resources Uranium, SR-11 Lease

Zone / Classification GT Cutoff
(ft%)
AVG.
Thickness
(ft)
AVG.
Grade
(%eU3O8)
Tons Pounds
(eU3O8)
SR-11 / Total Inferred 0.1 3.2 0.15          361,217     1,064,700
0.25 3.6 0.20          229,039        909,504
0.4 3.9 0.24          163,480        774,360

Mineral resources are not mineral reserves and do not have demonstrated economic viability in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum standards.  At a minimum, a preliminary feasibility study  is required to demonstrate the economic viability of the measured and indicated mineral resources and qualify an initial estimate of mineral reserves. The PEA is preliminary in nature such that it includes a portion of the inferred mineral resources.  Inferred mineral resources are too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the outcomes estimated in the PEA will be realized.

SM-18 Project Resource Estimate

The SM-18 Project within the SM-18 DOE Lease, located approximately 11 miles north of the Paradox Complex. This lease was previously held and operated by Cotter Corporation into the Mid 2000s. This is the initial resource estimate for the property performed by Anfield.  The data set acquired from Cotter Corporation was validated using existing and available geophysical logs. Drilling density would otherwise justify a higher resource classification. However, more field validation of historic drill hole locations or new confirmatory drilling is needed to raise the classification above Inferred.

The existing data for SM-18 consists of 681 drill collars, of which 677 drill holes had associated grade and thickness data. The 4 drill holes without data were limited to the margins of the SM-18 resource area and thus are considered by the authors of the PEA to have low impact on the data set overall. GT Contour modeling was performed using the key assumptions described in the table below, and was performed at 0.1ft%, 0.3ft% and 0.5 ft% eU3O8 GT cutoffs for sensitivity analysis. Nominal minimum thickness at the 0.4 ft% GT cutoff is 4 feet.

 The minimum sum GT contour resource model cutoff is the primary cutoff criteria applied to the contour model volume as the initial screening of those portions of the model quantities not meeting the criteria for reasonable economic extraction. In addition, individual model areas outside the conceptual mine limits not meeting a minimum of 10,000 lbs of eU3O8 resource were excluded from the resource totals as not meeting a minimum expectation of reasonable economic extraction. It is the opinion of the authors that the resource models are reasonably valid within the mineral resource classifications assigned to each area of the complex.

A sensitivity analysis was performed on the mineral resource models for each zone as shown in the table below. The authors recommend the 0.40 GT cutoff for the SR-11 Project. With further definition of the mineral resource via drilling and additional mine design and cost evaluation, it is the authors’ opinion that the minimum GT cutoff may be lowered with appropriate adjustments to mining methods made.

SM-18 Project Inferred Mineral Resource Estimates by GT Cutoff

Zone GT
Cutoff
(ft%)
AVG.
Thickness
(ft)
AVG.
Grade
(%eU3O8)
Tons Pounds
(eU3O8)
A 0.1 3.2 0.112       574,325     1,286,280
0.25 4.1 0.152       325,058       985,779
0.4 4.2 0.211       178,965       755,367
Total 0.1 3.2 0.112      574,325   1,286,280
0.25 4.1 0.152      325,058      985,779
0.4 4.2 0.211      178,965      755,367

While no formal economic evaluation, preliminary economic assessment, preliminary feasibility study, or feasibility study has been completed and while mineral resources are not mineral reserves and do not have demonstrated economic viability, reasonable prospects for future economic extraction were applied to the mineral resource estimate herein through consideration of grade and GT cutoffs and by screening out areas of isolated mineralization which would not support the cost of conventional mining under current and reasonably foreseeable conditions.

NI 43-101 Disclosure

The combined PEA completed for Velvet-Wood, Slick Rock and the West Slope Mines, using centralized processing at Shootaring, has been authored by Terence (Terry) McNulty, P.E., D. Sc., of T.P. McNulty and Associates Inc. and co-author Douglas L. Beahm, P.E. PG. Dr. McNulty is independent of the issuer in accordance with the application of Section 1.5 of NI 43-101. Mr. Beahm is not independent of the Company, as he is the Company’s Chief Operating Officer. The authors have reviewed and verified that the scientific and technical content of this news release in respect of the PEA is accurate and approve the written disclosure of such information.

Additional scientific and technical information in this news release not specific to the PEA has been prepared under the supervision of and approved by Douglas L. Beahm, P.E., P.G., a qualified person as defined by NI 43-101, and Mr. Beahm has reviewed, verified and approved such scientific and technical information contained in this news release. No limitations or failures to verify were identified. Mr. Beahm is not independent of the Company, as he is the Company’s Chief Operating Officer.

Results of the PEA represent forward-looking information. The PEA is preliminary in nature and it includes inferred mineral resources that are considered too speculative, geologically, to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the PEA will be realized. There is no guarantee that inferred mineral resource estimates will be converted to indicated or measured mineral resources, or that indicated or measured mineral resources can be converted to mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability, and as such there is no guarantee the project economics described herein will be achieved. Mineral resource estimates may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant risks, uncertainties and other factors, as more particularly described herein and to be described in the technical report in respect of the PEA.

Further information about the PEA referenced in this news release, including information in respect of data verification, key assumptions, parameters, risks and other factors, is contained in the technical report. Readers are encouraged to read the technical report in its entirety, including all qualifications, assumptions and exclusions that relate to the PEA. The technical report is intended to be read as a whole, and sections should not be read or relied upon out of context.

Non-IFRS Financial Measures

The Company has included certain non-IFRS financial measures in this news release, such as sustaining capital, which is not a measure recognized under IFRS and does not have a standardized meaning prescribed by IFRS. As a result, this measure may not be comparable to similar measures reported by other companies. This measure used is intended to provide additional information to the reader and should not be considered in isolation or as a substitute for measures prepared in accordance with IFRS. The non-IFRS financial measure used in this news release is defined below.

Sustaining Capital is a supplementary financial measure and defined as cash-basis expenditures which maintain operations and sustain production levels.

The projects that are subject of this news release do not currently have operations and therefore do not have historical equivalent measures to compare to. As such, the Company cannot perform a reconciliation of this non-IFRS measure.

About Anfield

Anfield is a uranium and vanadium development company that is committed to becoming a top-tier energy-related fuels supplier by creating value through sustainable, efficient growth in its assets. Anfield is a publicly traded corporation listed on the NASDAQ (AEC-Q), the TSXV (AEC-V) and the Frankfurt Stock Exchange (0AD).

On behalf of the Board of Directors
ANFIELD ENERGY INC.
Corey Dias, Chief Executive Officer

Neither the TSXV nor its Regulation Services Provider (as that term is defined in policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release.

Contact:

Anfield Energy, Inc.
Corporate Communications
604-669-5762
contact@anfieldenergy.com
www.anfieldenergy.com

This news release contains forward-looking statements and forward-looking information (together, “forward-looking statements”) within the meaning of applicable Canadian securities laws. All statements, other than statements of historical facts, are forward-looking statements. Generally, forward-looking statements can be identified by the use of terminology such as “plans”, “expects”, “estimates”, “intends”, “anticipates”, “believes” or variations of such words, or statements that certain actions, events or results “may”, “could”, “would”, “might”, “occur” or “be achieved”. Forward-looking statements in this release include, but are not limited to, statements regarding the development, operational and economic results of the PEA, including capital expenditures, NPV projections, IRR projections, development costs and sustaining capital; the plans for Shootaring to serve as a centralized mineral processing facility; estimation of future production; the potential of Velvet-Wood, Slick Rock, JD-7 and JD-8 within the Company’s uranium and vanadium hub-and-spoke production model; the potential addition of the Company’s 13 remaining DOE Leases to the Company’s production model pipeline and the expected capital expenditures needed; the Company’s plan to secure increased throughput capacity and production output at Shootaring; the potential of the Marquez-Juan Tafoya mine as an additional source of uranium to further extend the production timeline; the prospect of Shootaring becoming the next operational conventional uranium and vanadium mill in the United States and the benefits therefrom; the commercial development of the Company’s core uranium and vanadium assets; the Company’s usage of value-added techniques and technology to reduce waste in order to improve uranium and vanadium grades and further improve annual production output; the uranium market and the trend of nuclear energy becoming integral to the global transition towards electrification and the expected benefits therefrom; the conversion of the Shootaring license from its status of care and maintenance to operations and the economics and viability of development of Velvet-Wood, Slick Rock and the West Slope Mines.

Forward-looking statements involve risks, uncertainties and other factors that could cause actual results, performance and opportunities to differ materially from those implied by such forward-looking statements. Factors that could cause actual results to differ materially from these forward-looking statements include, among other things: risks that the technical report may not be completed as contemplated, or at all; risks that the development, operational and economic results of the PEA may differ from projections; risks that the potential of Velvet-Wood, Slick Rock, JD-7 and JD-8 within the Company’s uranium and vanadium hub-and-spoke production model may not be realized as contemplated, or at all; risks that the Company may not add its 13 remaining DOE Leases to the Company’s production model pipeline as contemplated, or at all; risks that the expected capital expenditures needed to add the 13 DOE Leases to the production model pipeline may vary from current expectations; risks that the Company may not be able to secure increased throughput capacity and production output at Shootaring as contemplated, or at all; risks that the potential of the Marquez-Juan Tafoya mine as an additional source of uranium to further extend the production timeline may not be realized as contemplated, or at all; risks that the Shootaring may not become an operational conventional uranium and vanadium mill in the United States as contemplated, or at all; risks that the commercial development of the Company’s core uranium and vanadium assets may not be completed as contemplated, or at all; risks that the anticipated benefits of the Company’s usage of value-added techniques and technology to reduce waste in order to improve uranium and vanadium grades may not be realized as contemplated, or at all; risks related to the global uranium market; risks that nuclear energy may not become integral to the global transition towards electrification as contemplated; risks that the Company may not successfully convert the status of the mill license for Shootaring from care and maintenance to operations as contemplated, or at all; risks related to the economics and viability of development of Velvet-Wood, Slick Rock and West Slope Mines; the risks and uncertainties relating to exploration and development; the ability of the Company to obtain additional financing; the need to comply with environmental and governmental regulations in Canada and the United States; fluctuations in the prices of commodities; operating hazards and risks; competition and other risks and uncertainties and other such factors as are set forth in the annual information form for the Company’s most recently completed year end, as well as the management discussion and analysis and other disclosures of risk factors for the Company, filed on SEDAR+ at www.sedarplus.ca.

Although the Company believes that the information and assumptions used in preparing the forward-looking statements are reasonable, undue reliance should not be placed on these statements, which only apply as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Except where required by applicable law, the Company disclaims any intention or obligation to update or revise any forward-looking statement, whether as a result of new information, future events or otherwise.

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/3d376b10-e62e-45b7-9129-32f049d405b6

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/24f574e7-5b26-45b9-9bc1-d26da3256bb5

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/506f50e6-2de3-4e06-aa06-449438c1a2e4

FAQ

What did Anfield Energy (AEC) announce in its June 2026 6-K?

Anfield Energy filed an updated preliminary economic assessment for its hub-and-spoke uranium and vanadium strategy using the Shootaring Canyon Mill. The PEA combines Velvet-Wood, Slick Rock and West Slope mines and outlines modeled economics, production forecasts and capital costs under National Instrument 43-101 standards.

What are the key economic metrics in Anfield Energy’s updated PEA?

The PEA reports a pre-tax internal rate of return of 106% and pre-tax net present value of US$606 million at an 8% discount rate. Post-tax, it shows a 97% IRR and US$533 million NPV, assuming uranium at US$100 per pound and vanadium at US$9 per pound.

What production levels does Anfield Energy (AEC) model in the PEA?

The assessment estimates average annual production of about 1.3 million pounds of uranium (U3O8) and 6.4 million pounds of vanadium (V2O5) over a 15-year mine life, with a peak year of 1.9 million pounds of uranium and 7.8 million pounds of vanadium from the combined projects.

How much capital spending is outlined in Anfield Energy’s PEA?

The PEA anticipates about US$97 million in pre-production capital over 12 months, including mill refurbishment and mine development. Total life-of-mine capital is estimated at US$173 million, including sustaining capital for Shootaring and the contributing mines feeding the centralized processing facility.

Which projects feed the Shootaring mill in Anfield Energy’s hub-and-spoke model?

The PEA combines Utah’s Velvet-Wood project, Colorado’s Slick Rock project and six of nine West Slope mines, including JD-6, JD-7, JD-8, JD-9, SR-11 and SM-18. Their combined feed is designed to utilize Shootaring’s planned capacity of 1,000 tons of ore per day.

How does Anfield Energy describe the risk level of this preliminary economic assessment?

Anfield emphasizes that the PEA is preliminary and incorporates inferred mineral resources, which are too speculative geologically to qualify as reserves. It states there is no certainty the PEA’s outcomes will be realized and notes multiple permitting, market and technical risks may materially affect results.

Filing Exhibits & Attachments

1 document