Eletrobras (NYSE: EBR) outlines 2025 AXIA Energia output, contracts and RAP
Centrais Elétricas Brasileiras S.A. (Eletrobras) provides an extensive operational snapshot of its AXIA Energia platform, covering generation, transmission, contracts and investments for 2025. The portfolio combines large hydro, wind, thermal and solar assets across AXIA Energia Norte, Nordeste, Sul and Holding, with detailed installed capacity and physical guarantee by plant.
The tables show quarterly generated energy by project, losses, ACR and ACL contracts, reserve and availability contracts, and pass-through structures for Amazonas thermals. An energy balance for 2025–2027 compares own resources and purchases against contracted sales and indicates estimated hedge levels based on historical hydrology. Eletrobras also discloses BRL 8.58 billion in total 2025 investments across generation, transmission, environmental and infrastructure projects, plus approved annual transmission revenues (RAP) under renewed and auctioned concession contracts.
Positive
- None.
Negative
- None.
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 6-K
Report of Foreign Private Issuer
Pursuant to Rule 13a-16 or 15d-16 of the
Securities Exchange Act of 1934
For the month of February, 2026
Commission File Number 1-34129
CENTRAIS ELÉTRICAS BRASILEIRAS S.A. - ELETROBRÁS
(Exact name of registrant as specified in its charter)
BRAZILIAN ELECTRIC POWER COMPANY
(Translation of Registrant's name into English)
Rua da Quitanda, 196 – 24th floor,
Centro, CEP 20091-005,
Rio de Janeiro, RJ, Brazil
(Address of principal executive office)
Indicate by check mark whether the registrant files or will file annual reports under cover Form 20-F or Form 40-F.
Form 20-F ___X___ Form 40-F _______
Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934.
Yes _______ No___X____

| Market Data of AXIA Energia Companies | |||||||||||||||||||
| Installed Capacity and Physical Guarantee – MW | |||||||||||||||||||
| Company | Full Responsibility | Consolidated SPEs | SPEs recognized by equity method | Net aggregation 2025 | Total | ||||||||||||||
| Installed Capacity | Physical Guarantee Law 13,182/15 | Physical Guarantee Decoupled | Physical Guarantee Share | Total Physical Guarantee | Installed Capacity | Physical Guarantee Law 13,182/15 | Physical Guarantee Decoupled | Physical Guarantee Share | Total Physical Guarantee | Installed Capacity | Physical Guarantee Law 13,182/15 | Physical Guarantee Decoupled | Physical Guarantee Share | Total Physical Guarantee | Installed Capacity | Physical Guarantee | Installed Capacity | Physical Guarantee | |
| AXIA Energia | 7,729 | 759 | 2,938 | 1,185 | 4,124 | 14,640 | 0 | 6,392 | 0 | 6,392 | 2,863 | 0 | 1,774 | 0 | 1,774 | - 200 | - 223 | 25,232 | 12,290 |
| AXIA Energia Norte | 10,955 | 759 | 5,075 | 50 | 5,125 | 408 | 0 | 0 | 105 | 105 | 128 | 0 | 72 | 0 | 72 | - 770 | - 657 | 11,491 | 5,301 |
| AXIA Energia Nordeste | 10,460 | 506 | 3,123 | 1,666 | 4,789 | 0 | 0 | 0 | 0 | 0 | 2,082 | 0 | 915 | 0 | 915 | - | - | 12,542 | 5,703 |
| AXIA Energia Sul | 578 | 0 | 139 | 0 | 139 | 700 | 0 | 364 | 0 | 364 | 578 | 0 | 343 | 0 | 343 | - 115 | - 92 | 1,856 | 846 |
| Total | 29,722 | 2,024 | 11,276 | 2,901 | 14,177 | 15,748 | 0 | 6,756 | 105 | 6,861 | 5,651 | 0 | 3,102 | 0 | 3,102 | -1,085 | - 973 | 51,120 | 24,140 |
| Company | Power plant | Total Physical Guarantee (Mwm) (100% of Assets) | Installed Capacity(MW) (100%) | % Stake | Total Physical Guarantee (Mwm) (Proportional) | Installed Capacity(MW) (Proportional) | Classification | ||||||||||||
| Total (Mwm) (100% of Assets) | Quoted (MWm) (1) | Decoupled (MWm) (1) | Law 13,182(MWm) (2) | % Decoupled Physical Guarantee | Total (Mwm) (100% of Assets) | Quoted (MWm) (1) | Decoupled (MWm) (1) | Law 13,182(MWm) (2) | % Decoupled Physical Guarantee | ||||||||||
| AXIA Energia Nordeste | Funil | 4.800 | 1.877 | 2.923 | 0.106 | 60% | 30 | 100.00% | 5 | 2 | 3 | 0 | 60% | 30 | Full Responsibility | ||||
| AXIA Energia Nordeste | Pedra | 1.740 | 0.681 | 1.059 | 0.038 | 60% | 20 | 100.00% | 2 | 1 | 1 | 0 | 60% | 20 | Full Responsibility | ||||
| AXIA Energia Nordeste | Paulo Afonso Complex | 1,658.800 | 648.862 | 1,009.938 | 36.659 | 60% | 4,280 | 100.00% | 1,659 | 649 | 1,010 | 37 | 60% | 4,280 | Full Responsibility | ||||
| AXIA Energia Nordeste | Sobradinho | 457.500 | 0.000 | 457.500 | 411.750 | na | 1,050 | 100.00% | 458 | 0 | 458 | 412 | na | 1,050 | Full Responsibility | ||||
| AXIA Energia Nordeste | Luiz Gonzaga (Itaparica) | 727.000 | 284.376 | 442.624 | 16.067 | 60% | 1,480 | 100.00% | 727 | 284 | 443 | 16 | 60% | 1,480 | Full Responsibility | ||||
| AXIA Energia Nordeste | Boa Esperança (Castelo Branco) | 136.200 | 53.276 | 82.924 | 3.010 | 60% | 237 | 100.00% | 136 | 53 | 83 | 3 | 60% | 237 | Full Responsibility | ||||
| AXIA Energia Nordeste | Xingó | 1,729.800 | 676.629 | 1,053.171 | 38.229 | 60% | 3,162 | 100.00% | 1,730 | 677 | 1,053 | 38 | 60% | 3,162 | Full Responsibility | ||||
| AXIA Energia Nordeste | Curemas | 1.000 | 0.000 | 1.000 | 0.000 | na | 4 | 100.00% | 1 | 0 | 1 | 0 | na | 4 | Full Responsibility | ||||
| AXIA Energia Nordeste | Casa Nova I A | NA | 0.000 | - | 0.000 | na | 27 | 100.00% | 0 | 0 | na | 27 | Full Responsibility | ||||||
| AXIA Energia Nordeste | Casa Nova II | 9.400 | 0.000 | 9.400 | 0.000 | na | 33 | 100.00% | 9 | 0 | 9 | 0 | na | 33 | Full Responsibility | ||||
| AXIA Energia Nordeste | Casa Nova III | 9.400 | 0.000 | 9.400 | 0.000 | na | 28 | 100.00% | 9 | 0 | 9 | 0 | na | 28 | Full Responsibility | ||||
| AXIA Energia Nordeste | Acauã | 3.100 | 0.000 | 3.100 | 0.000 | na | 6 | 100.00% | 3 | 0 | 3 | 0 | na | 6 | Full Responsibility | ||||
| AXIA Energia Nordeste | Angical 2 | 5.100 | 0.000 | 5.100 | 0.000 | na | 10 | 100.00% | 5 | 0 | 5 | 0 | na | 10 | Full Responsibility | ||||
| AXIA Energia Nordeste | Arapapá | 2.200 | 0.000 | 2.200 | 0.000 | na | 4 | 100.00% | 2 | 0 | 2 | 0 | na | 4 | Full Responsibility | ||||
| AXIA Energia Nordeste | Caititu 2 | 5.100 | 0.000 | 5.100 | 0.000 | na | 10 | 100.00% | 5 | 0 | 5 | 0 | na | 10 | Full Responsibility | ||||
| AXIA Energia Nordeste | Caititu 3 | 4.700 | 0.000 | 4.700 | 0.000 | na | 10 | 100.00% | 5 | 0 | 5 | 0 | na | 10 | Full Responsibility | ||||
| AXIA Energia Nordeste | Carcará | 4.600 | 0.000 | 4.600 | 0.000 | na | 10 | 100.00% | 5 | 0 | 5 | 0 | na | 10 | Full Responsibility | ||||
| AXIA Energia Nordeste | Coqueirinho 2 | 7.400 | 0.000 | 7.400 | 0.000 | na | 16 | 100.00% | 7 | 0 | 7 | 0 | na | 16 | Full Responsibility | ||||
| AXIA Energia Nordeste | Corrupião 3 | 4.200 | 0.000 | 4.200 | 0.000 | na | 10 | 100.00% | 4 | 0 | 4 | 0 | na | 10 | Full Responsibility | ||||
| AXIA Energia Nordeste | Papagaio | 4.900 | 0.000 | 4.900 | 0.000 | na | 10 | 100.00% | 5 | 0 | 5 | 0 | na | 10 | Full Responsibility | ||||
| AXIA Energia Nordeste | Tamanduá Mirim 2 | 7.400 | 0.000 | 7.400 | 0.000 | na | 16 | 100.00% | 7 | 0 | 7 | 0 | na | 16 | Full Responsibility | ||||
| AXIA Energia Nordeste | Teiú 2 | 4.200 | 0.000 | 4.200 | 0.000 | na | 8 | 100.00% | 4 | 0 | 4 | 0 | na | 8 | Full Responsibility | ||||
| AXIA Energia Sul | HPP Passo São João | 39.100 | 0.000 | 39.100 | 0.000 | na | 77 | 100.00% | 39 | 0 | 39 | 0 | na | 77 | Full Responsibility | ||||
| AXIA Energia Sul | HPP São Domingos | 36.400 | 0.000 | 36.400 | 0.000 | na | 48 | 100.00% | 36 | 0 | 36 | 0 | na | 48 | Full Responsibility | ||||
| AXIA Energia Sul | SHP Barra do Rio Chapéu | 6.700 | 0.000 | 6.700 | 0.000 | na | 15 | 100.00% | 7 | 0 | 7 | 0 | na | 15 | Full Responsibility | ||||
| AXIA Energia Sul | SHP João Borges | 9.000 | 0.000 | 9.000 | 0.000 | na | 19 | 100.00% | 9 | 0 | 9 | 0 | na | 19 | Full Responsibility | ||||
| AXIA Energia Sul | Cerro Chato I Wind Farm | 4.200 | 0.000 | 4.200 | 0.000 | na | 8 | 100.00% | 4 | 0 | 4 | 0 | na | 8 | Full Responsibility | ||||
| AXIA Energia Sul | Cerro Chato II Wind Farm | 11.330 | 0.000 | 11.330 | 0.000 | na | 30 | 100.00% | 11 | 0 | 11 | 0 | na | 30 | Full Responsibility | ||||
| AXIA Energia Sul | Cerro Chato III Wind Farm | 11.330 | 0.000 | 11.330 | 0.000 | na | 30 | 100.00% | 11 | 0 | 11 | 0 | na | 30 | Full Responsibility | ||||
| AXIA Energia Sul | WPP Coxilha Negra 2 (18) | 0.000 | 0.000 | 0.000 | 0.000 | na | 101 | 100.00% | 0 | 0 | 0 | 0 | na | 101 | Full Responsibility | ||||
| AXIA Energia Sul | WPP Coxilha Negra 3 | 0.000 | 0.000 | 0.000 | 0.000 | na | 105 | 100.00% | 0 | 0 | 0 | 0 | na | 105 | Full Responsibility | ||||
| AXIA Energia Sul | WPP Coxilha Negra 4 | 0.000 | 0.000 | 0.000 | 0.000 | na | 97 | 100.00% | 0 | 0 | 0 | 0 | na | 97 | Full Responsibility | ||||
| AXIA Energia Sul | WPP Coxilha Seca | 13.200 | 0.000 | 13.200 | 0.000 | na | 30 | 100.00% | 13 | 0 | 13 | 0 | na | 30 | Full Responsibility | ||||
| AXIA Energia Sul | WPP Capão do Inglês | 4.500 | 0.000 | 4.500 | 0.000 | na | 10 | 100.00% | 5 | 0 | 5 | 0 | na | 10 | Full Responsibility | ||||
| AXIA Energia Sul | WPP Galpões | 3.700 | 0.000 | 3.700 | 0.000 | na | 8 | 100.00% | 4 | 0 | 4 | 0 | na | 8 | Full Responsibility | ||||
| AXIA Energia Sul | Solar Megawatt | 0.000 | 0.000 | 0.000 | 0.000 | na | 1 | 100.00% | 0 | 0 | 0 | 0 | na | 1 | Full Responsibility | ||||
| AXIA Energia | Jaguari | 12.700 | 0.000 | 12.700 | 0.000 | na | 28 | 100.00% | 13 | 0 | 13 | 0 | na | 28 | Full Responsibility | ||||
| AXIA Energia | Colíder | 178.100 | 0.000 | 178.100 | 0.000 | na | 300 | 100.00% | 178 | 0 | 178 | 0 | na | 300 | Full Responsibility | ||||
| AXIA Energia | Mascarenhas de Moraes | 299.800 | 0.000 | 299.800 | 0.000 | na | 476 | 100.00% | 300 | 0 | 300 | 0 | na | 476 | Full Responsibility | ||||
| AXIA Energia | Simplício | 182.600 | 0.000 | 182.600 | 0.000 | na | 334 | 100.00% | 183 | 0 | 183 | 0 | na | 334 | Full Responsibility | ||||
| AXIA Energia | Batalha | 47.000 | 0.000 | 47.000 | 0.000 | na | 53 | 100.00% | 47 | 0 | 47 | 0 | na | 53 | Full Responsibility | ||||
| AXIA Energia | Serra da Mesa | 605.700 | 0.000 | 605.700 | 0.000 | na | 1,275 | 100.00% | 606 | 0 | 606 | 0 | na | 1,275 | Full Responsibility | ||||
| AXIA Energia | Manso | 83.500 | 0.000 | 83.500 | 0.000 | na | 210 | 70.00% | 58 | 0 | 58 | 0 | na | 147 | Full Responsibility | ||||
| AXIA Energia | Furnas | 401.200 | 250.000 | 151.200 | 0.000 | 38% | 500 | 100.00% | 401 | 250 | 151 | 0 | 38% | 500 | Full Responsibility | ||||
| AXIA Energia | Luis Carlos Barreto (Estreito) | 625.000 | 250.000 | 375.000 | 0.000 | 60% | 1,216 | 100.00% | 625 | 250 | 375 | 0 | 60% | 1,216 | Full Responsibility | ||||
| AXIA Energia | Porto Colômbia | 497.200 | 198.880 | 298.320 | 0.000 | 60% | 1,050 | 100.00% | 497 | 199 | 298 | 0 | 60% | 1,050 | Full Responsibility | ||||
| AXIA Energia | Marimbondo | 205.400 | 82.160 | 123.240 | 0.000 | 60% | 320 | 100.00% | 205 | 82 | 123 | 0 | 60% | 320 | Full Responsibility | ||||
| AXIA Energia | Funil | 688.700 | 275.480 | 413.220 | 0.000 | 60% | 1,440 | 100.00% | 689 | 275 | 413 | 0 | 60% | 1,440 | Full Responsibility | ||||
| AXIA Energia | Corumbá I | 102.400 | 40.960 | 61.440 | 0.000 | 60% | 216 | 100.00% | 102 | 41 | 61 | 0 | 60% | 216 | Full Responsibility | ||||
| AXIA Energia | Itumbiara | 219.500 | 87.800 | 131.700 | 759.120 | 116% | 375 | 100.00% | 220 | 88 | 132 | 759 | 116% | 375 | Full Responsibility | ||||
| AXIA Energia Norte | HPP Coaracy Nunes | 948.900 | 24.880 | 924.020 | 759.120 | 87% | 2,082 | 100.00% | 949 | 25 | 924 | 759 | 87% | 2,082 | Full Responsibility | ||||
| AXIA Energia Norte | Complexo de Tucuruí | 62.200 | 24.880 | 37.320 | 0.000 | 60% | 78 | 100.00% | 62 | 25 | 37 | 0 | 60% | 78 | Full Responsibility | ||||
| AXIA Energia Norte | HPP Samuel | 3,995.500 | 0.000 | 3,995.500 | 0.000 | na | 8,535 | 100.00% | 3,996 | 0 | 3,996 | 0 | na | 8,535 | Full Responsibility | ||||
| AXIA Energia Norte | HPP Curuá-Una | 88.100 | 0.000 | 88.100 | 0.000 | na | 217 | 100.00% | 88 | 0 | 88 | 0 | na | 217 | Full Responsibility | ||||
| AXIA Energia Norte | HPP Balbina | 30.400 | 0.000 | 30.400 | 0.000 | na | 43 | 100.00% | 30 | 0 | 30 | 0 | na | 43 | Full Responsibility | ||||
| AXIA Energia Sul | Ibirapuitã I | 125.700 | 0.000 | 125.700 | 0.000 | na | 250 | 100.00% | 126 | 0 | 126 | 0 | na | 250 | Consolidated SPE | ||||
| AXIA Energia | Três Irmãos | 9.300 | 0.000 | 9.300 | 0.000 | na | 25 | 49.90% | 5 | 0 | 5 | 0 | na | 13 | SPE by equity method | ||||
| AXIA Energia Norte | Teles Pires | 206.700 | 206.700 | 0.000 | 0.000 | 0% | 808 | 50.56% | 105 | 105 | 0 | 0 | 0% | 408 | Consolidated SPE | ||||
| AXIA Energia | Teles Pires | 964.200 | 0.000 | 964.200 | 0.000 | na | 1,820 | 24.72% | 238 | 0 | 238 | 0 | na | 450 | Consolidated SPE | ||||
| AXIA Energia Sul | Teles Pires | 964.200 | 0.000 | 964.200 | 0.000 | na | 1,820 | 24.72% | 238 | 0 | 238 | 0 | na | 450 | Consolidated SPE | ||||
| AXIA Energia | São Januário | 964.200 | 0.000 | 964.200 | 0.000 | na | 1,820 | 100.00% | 964 | 0 | 964 | 0 | na | 1,820 | Consolidated SPE | ||||
| AXIA Energia | Nossa Senhora de Fátima | 9.700 | 0.000 | 9.700 | 0.000 | na | 21 | 100.00% | 10 | 0 | 10 | 0 | na | 21 | Consolidated SPE | ||||
| AXIA Energia | Jandaia | 13.600 | 0.000 | 13.600 | 0.000 | na | 30 | 100.00% | 14 | 0 | 14 | 0 | na | 30 | Consolidated SPE | ||||
| AXIA Energia | São Clemente | 14.100 | 0.000 | 14.100 | 0.000 | na | 27 | 100.00% | 14 | 0 | 14 | 0 | na | 27 | Consolidated SPE | ||||
| AXIA Energia | Jandaia I | 10.200 | 0.000 | 10.200 | 0.000 | na | 21 | 100.00% | 10 | 0 | 10 | 0 | na | 21 | Consolidated SPE | ||||
| AXIA Energia | Serra do Facão | 10.600 | 0.000 | 10.600 | 0.000 | na | 24 | 54.01% | 6 | 0 | 6 | 0 | na | 13 | SPE by equity method | ||||
| AXIA Energia | Retiro Baixo | 174.400 | 0.000 | 174.400 | 0.000 | na | 213 | 100.00% | 174 | 0 | 174 | 0 | na | 213 | Consolidated SPE | ||||
| AXIA Energia Norte | Belo Monte | 34.800 | 0.000 | 34.800 | 0.000 | na | 84 | 34.98% | 12 | 0 | 12 | 0 | na | 29 | SPE by equity method | ||||
| AXIA Energia Nordeste | Belo Monte | 4,571.000 | 0.000 | 4,571.000 | 0.000 | na | 11,233 | 15.00% | 686 | 0 | 686 | 0 | na | 1,685 | SPE by equity method | ||||
| AXIA Energia | Santo Antônio | 4,571.000 | 0.000 | 4,571.000 | 0.000 | na | 11,233 | 99.74% | 4,559 | 0 | 4,559 | 0 | na | 11,203 | Consolidated SPE | ||||
| AXIA Energia | Peixe Angical | 2,313.300 | 0.000 | 2,313.300 | 0.000 | na | 3,568 | 40.00% | 925 | 0 | 925 | 0 | na | 1,427 | SPE by equity method | ||||
| AXIA Energia Nordeste | Jirau | 266.600 | 0.000 | 266.600 | 0.000 | na | 499 | 24.59% | 66 | 0 | 66 | 0 | na | 123 | SPE by equity method | ||||
| AXIA Energia Sul | Jirau | 2,222.600 | 0.000 | 2,222.600 | 0.000 | na | 3,750 | 15.41% | 343 | 0 | 343 | 0 | na | 578 | SPE by equity method | ||||
| AXIA Energia | São Manoel | 2,222.600 | 0.000 | 2,222.600 | 0.000 | na | 3,750 | 33.33% | 741 | 0 | 741 | 0 | na | 1,250 | SPE by equity method | ||||
| AXIA Energia Nordeste | Sinop | 430.400 | 0.000 | 430.400 | 0.000 | na | 700 | 24.50% | 105 | 0 | 105 | 0 | na | 172 | SPE by equity method | ||||
| AXIA Energia Norte | Sinop | 242.800 | 0.000 | 242.800 | 0.000 | na | 402 | 24.50% | 59 | 0 | 59 | 0 | na | 98 | SPE by equity method | ||||
| AXIA Energia | Foz do Chapecó | 242.800 | 0.000 | 242.800 | 0.000 | na | 402 | 40.00% | 97 | 0 | 97 | 0 | na | 161 | SPE by equity method | ||||
| AXIA Energia | Baguari | 408.900 | 0.000 | 408.900 | 0.000 | na | 855 | 100.00% | 409 | 0 | 409 | 0 | na | 855 | Consolidated SPE | ||||
| AXIA Energia Nordeste | Caiçara I | 81.900 | 0.000 | 81.900 | 0.000 | na | 140 | 49.00% | 40 | 0 | 40 | 0 | na | 69 | SPE by equity method | ||||
| AXIA Energia Nordeste | Caiçara II | 13.500 | 0.000 | 13.500 | 0.000 | na | 27 | 49.00% | 7 | 0 | 7 | 0 | na | 13 | SPE by equity method | ||||
| AXIA Energia Nordeste | Junco I | 9.600 | 0.000 | 9.600 | 0.000 | na | 18 | 49.00% | 5 | 0 | 5 | 0 | na | 9 | SPE by equity method | ||||
| AXIA Energia Nordeste | Junco II | 13.100 | 0.000 | 13.100 | 0.000 | na | 24 | 49.00% | 6 | 0 | 6 | 0 | na | 12 | SPE by equity method | ||||
| 0 | 0 | 11.800 | 0.000 | 11.800 | 0.000 | na | 24 | 0.00% | 0 | 0 | 0 | 0 | na | 0 | FALSO | ||||
| Company | Power plant | Total Physical Guarantee (Mwm) (100% of Assets) | Installed Capacity(MW) (100%) | % Stake | Total Physical Guarantee (Mwm) (Proportional) | Installed Capacity(MW) (Proportional) | Classification | ||||||||||||
| Total (Mwm) (100% of Assets) | Quoted (MWm) (1) | Decoupled (MWm) (1) | Law 13,182(MWm) (2) | % Decoupled Physical Guarantee | Total (Mwm) (100% of Assets) | Quoted (MWm) (1) | Decoupled (MWm) (1) | Law 13,182(MWm) (2) | % Decoupled Physical Guarantee | ||||||||||
| AXIA Energia Sul | WPP Coxilha Negra 4 | 0.00 | 0.00 | 0.00 | 0.00 | na | 63.00 | 100.00% | 0.00 | 0.00 | 0.00 | 0.00 | na | 63.00 | Net aggregation 2025 | ||||
| AXIA Energia | Colíder | 178.10 | 0.00 | 178.10 | 0.00 | na | 300 | 100.00% | 178.10 | 0.00 | 178.10 | 0.00 | na | 300.00 | Net aggregation 2025 | ||||
| AXIA Energia Norte | TPP Aparecida | -150.00 | 0.00 | -150.00 | 0.00 | na | -166.00 | 100.00% | -150.00 | 0.00 | -150.00 | 0.00 | na | -166.00 | Net aggregation 2025 | ||||
| AXIA Energia Norte | TPP MAUÁ 3 | -507.40 | 0.00 | -507.40 | 0.00 | na | -590.75 | 100.00% | -507.40 | 0.00 | -507.40 | 0.00 | na | -590.75 | Net aggregation 2025 | ||||
| AXIA Energia Norte | TPP ANAMÃ | 0.00 | 0.00 | 0.00 | 0.00 | na | -2.17 | 100.00% | 0.00 | 0.00 | 0.00 | 0.00 | na | -2.17 | Net aggregation 2025 | ||||
| AXIA Energia Norte | TPP ANORI | 0.00 | 0.00 | 0.00 | 0.00 | na | -4.57 | 100.00% | 0.00 | 0.00 | 0.00 | 0.00 | na | -4.57 | Net aggregation 2025 | ||||
| AXIA Energia Norte | TPP CAAPIRANGA | 0.00 | 0.00 | 0.00 | 0.00 | na | -2.17 | 100.00% | 0.00 | 0.00 | 0.00 | 0.00 | na | -2.17 | Net aggregation 2025 | ||||
| AXIA Energia Norte | TPP CODAJÁS | 0.00 | 0.00 | 0.00 | 0.00 | na | -4.57 | 100.00% | 0.00 | 0.00 | 0.00 | 0.00 | na | -4.57 | Net aggregation 2025 | ||||
| AXIA Energia Sul | HPP Governador Jayme Canet Júnior | -188.50 | 0.00 | -188.50 | 0.00 | na | -363.14 | 49.00% | -92.37 | 0.00 | -92.37 | 0.00 | na | -177.94 | Net aggregation 2025 | ||||
| AXIA Energia | Santa Cruz | -401.20 | 0.00 | -401.20 | 0.00 | na | -500.00 | 100.00% | -401.20 | 0.00 | -401.20 | 0.00 | na | -500.00 | Net aggregation 2025 | ||||
| (1) Decoupling is equivalent to 60% of the total value of the physical guarantee for the year 2025. Projects under the O&M regime, whose concession has been renewed by law 14,182/21. | |||||||||||||||||||
| (2) Projects renewed by law 13,182/15. | |||||||||||||||||||
| Generation Data | ||||||||||||||||||||||
| Installed Capacity - MW | ||||||||||||||||||||||
| Generation Assets and Generated Energy | ||||||||||||||||||||||
| Hydraulic Generation Assets and Generated Energy – Projects under Full Responsibility | ||||||||||||||||||||||
| AXIA Energia Company | Project | Location | Source | Start of Concession | Start of Operation | End of Operation | Installed Capacity | Physical Guarantee | Generated Energy (MWh) | |||||||||||||
| (State) | (MW) | (Average MW) | 1Q25 | 2Q25 | 3Q25 | 4Q25 | ||||||||||||||||
| AXIA Energia Norte | Complexo de Tucuruí (11) | PA | Hydraulics | Jun-22 | Dec-84 | Jun-52 | 8,535.00 | 3,995.50 | 8,389,320 | 7,432,465 | 4,200,319 | 6,108,176 | ||||||||||
| Samuel | RO | Hydraulics | Sep-79 | Jul-89 | Jul-32 | 216.75 | 88.10 | 306,957 | 262,408 | 144,072 | 116,840 | |||||||||||
| Curuá-Una (11) | PA | Hydraulics | Jun-22 | Jan-77 | Jun-52 | 42.80 | 30.40 | 68,035 | 60,639 | 65,217 | 55,858 | |||||||||||
| Balbina | AM | Hydraulics | Mar-77 | Feb-89 | Mar-27 | 249.75 | 125.70 | 130,641 | 202,035 | 306,335 | 305,375 | |||||||||||
| AXIA Energia Nordeste | Curemas | PB | Hydraulics | Nov-04 | Jul-57 | Feb-26 | 3.52 | 1.00 | - | - | - | 2.05 | ||||||||||
| AXIA Energia | Jaguari (15) | SP | Hydraulics | Jan-21 | Dec-73 | (5) | 27.6 | 12.70 | 3,144 | 7,663 | 27,831 | 11,545 | ||||||||||
| Colíder | MT | Hydraulics | Jan-11 | Mar-19 | Jan-47 | 300 | 178.10 | - | - | 188,220 | 173,673 | |||||||||||
| Mascarenhas de Moraes (12) | MG | Hydraulics | Jun-22 | Apr-57 | Jun-52 | 476.00 | 299.80 | 363,471 | 458,640 | 548,401 | 563,069 | |||||||||||
| Simplício e Anta (16) | RJ | Hydraulics | Aug-06 | Jun-13 | Dec-43 | 333.70 | 182.60 | 327,132 | 255,472 | 110,517 | 118,097 | |||||||||||
| Batalha (16) | MG | Hydraulics | Aug-06 | May-14 | Apr-43 | 52.50 | 47.00 | 88,343 | 56,829 | 54,805 | 53,530 | |||||||||||
| Serra da Mesa (48,46%) (2) (3) (14) | GO | Hydraulics | May-81 | Apr-98 | May-46 | 1,275.00 | 605.70 | 716,598 | 1,022,593 | 1,412,991 | 1,049,088 | |||||||||||
| Manso (70%) (3) (15) | MT | Hydraulics | Feb-00 | Nov-00 | Sep-37 | 210.00 | 83.50 | 185,566 | 177,466 | 121,916 | 109,690 | |||||||||||
| AXIA Energia Sul | Governador Jayme Canet Júnior (4) (16) | PR | Hydraulics | Jul-07 | Nov-12 | Jun-49 | 363.13 | 188.50 | 347,497 | 132,197 | ||||||||||||
| Passo São João (18) | RS | Hydraulics | Aug-06 | Mar-12 | May-46 | 77.00 | 39.10 | 15,065 | 77,576 | 122,816 | 88,399 | |||||||||||
| São Domingos | MS | Hydraulics | Dec-02 | Jun-13 | Aug-39 | 48.00 | 36.40 | 67,314 | 60,748 | 39,841 | 35,790 | |||||||||||
| Barra do Rio Chapéu | SC | Hydraulics | May-04 | Feb-13 | May-38 | 15.15 | 6.70 | 24,081 | 11,661 | 15,304 | 19,329 | |||||||||||
| João Borges | SC | Hydraulics | Dec-05 | Jul-13 | Sep-39 | 19.00 | 9.00 | 8,916 | 7,525 | 21,214 | 17,449 | |||||||||||
| II.1.2.2 Thermal Generation Assets and Generated Energy – Projects under Full Responsibility | ||||||||||||||||||||||
| AXIA Energia Company | Project | Location | Source | Start of Concession | Start of Operation | End of Operation | Installed Capacity | Physical Guarantee | Generated Energy (MWh) | Fuel Type | Metric Unit | Fuel used for electric power production | ||||||||||
| 1Q25 | 2Q25 | 3Q25 | 4Q25 | |||||||||||||||||||
| (State) | (MW) | (Average MW) | 1Q25 | 2Q25 | 3Q25 | 4Q25 | Qty. | BRL Million | Qty. | BRL Million | Qty. | BRL Million | Qty. | BRL Million | ||||||||
| AXIA Energia | Santa Cruz (7) (8) (13) | RJ | Thermal | Aug-25 | Jul-67 | Jul-35 | 500.00 | 401.20 | 22,018 | 121,201 | 503,272 | 213,023 | Natural Gas | m3 | - | - | - | - | - | - | - | - |
| II.1.2.3 Wind Generation Assets and Generated Energy – Projects under Full Responsibility | ||||||||||||||||||||||
| AXIA Energia Company | Project | Location | Source | Start of Concession | Start of Operation | End of Operation | Installed Capacity | Physical Guarantee | Generated Energy (MWh) | |||||||||||||
| (State) | (MW) | (Average MW) | 1Q25 | 2Q25 | 3Q25 | 4Q25 | ||||||||||||||||
| AXIA Energia Nordeste | Casa Nova I A (10) | BA | Wind | Jun-19 | Dec-20 | Jun-54 | 27.00 | NA | 13,104 | 19,459 | 26,530 | 17,496 | ||||||||||
| Casa Nova II | BA | Wind | May-14 | Dec-17 | May-49 | 32.90 | 9.40 | 9,297 | 15,933 | 24,177 | 16,726 | |||||||||||
| Casa Nova III | BA | Wind | May-14 | Feb-18 | May-49 | 28.20 | 9.40 | 9,617 | 16,811 | 25,576 | 18,031 | |||||||||||
| Acauã | BA | Wind | Apr-14 | Nov-19 | Apr-49 | 6.00 | 3.10 | 2,259 | 5,307 | 5,133 | 1,810 | |||||||||||
| Angical 2 | BA | Wind | Apr-14 | Sep-19 | Apr-49 | 10.00 | 5.10 | 2,101 | 2,674 | 2,883 | 1,956 | |||||||||||
| Arapapá | BA | Wind | Apr-14 | Nov-19 | Apr-49 | 4.00 | 2.20 | 475 | 1,355 | 1,412 | 349 | |||||||||||
| Caititu 2 | BA | Wind | Apr-14 | Jan-20 | Apr-49 | 10.00 | 5.10 | 2,046 | 3,699 | 3,394 | 1,419 | |||||||||||
| Caititu 3 | BA | Wind | Apr-14 | Jan-20 | Apr-49 | 10.00 | 4.70 | 1,198 | 2,229 | 3,447 | 1,768 | |||||||||||
| Carcará | BA | Wind | Apr-14 | Feb-20 | Apr-49 | 10.00 | 4.60 | 1,013 | 2,721 | 1,531 | 1,398 | |||||||||||
| Coqueirinho 2 | BA | Wind | May-14 | Sep-19 | May-49 | 16.00 | 7.40 | 2,736 | 6,670 | 4,494 | 3,050 | |||||||||||
| Corrupião 3 | BA | Wind | Apr-14 | Feb-20 | Apr-49 | 10.00 | 4.20 | 1,352 | 2,867 | 3,638 | 1,763 | |||||||||||
| Papagaio | BA | Wind | May-14 | Oct-19 | May-49 | 10.00 | 4.90 | 1,821 | 3,491 | 3,510 | 1,745 | |||||||||||
| Tamanduá Mirim 2 | BA | Wind | Jun-14 | Nov-19 | Jun-49 | 16.00 | 7.40 | 2,992 | 7,822 | 6,223 | 3,208 | |||||||||||
| Teiú 2 | BA | Wind | Apr-14 | Nov-19 | Apr-49 | 8.00 | 4.20 | 846 | 3,126 | 3,465 | 688 | |||||||||||
| AXIA Energia Sul | CERRO CHATO I | RS | Wind | Apr-14 | Nov-19 | Apr-49 | 8.00 | 4.20 | 19,045 | 21,445 | 25,705 | 20,738 | ||||||||||
| CERRO CHATO II | RS | Wind | Aug-10 | Aug-11 | Aug-45 | 30.00 | 11.33 | 19,224 | 22,092 | 26,053 | 21,002 | |||||||||||
| CERRO CHATO III | RS | Wind | Aug-10 | Jun-11 | Aug-45 | 30.00 | 11.33 | 19,449 | 22,069 | 26,385 | 21,190 | |||||||||||
| Coxilha Negra 2 (17) | RS | Wind | Aug-22 | Jul-24 | Aug-57 | 100.80 | 40.50 | 45,071 | 67,788 | 79,218 | 56,251 | |||||||||||
| Coxilha Negra 3 (18) | RS | Wind | Aug-22 | Dec-24 | Aug-57 | 105.00 | 41.60 | 24,625 | 65,447 | 79,217 | 50,101 | |||||||||||
| Coxilha Negra 4 (19) | RS | Wind | Aug-22 | Jan-25 | Aug-57 | 96.60 | 39.90 | 5,904 | 40,027 | 53,884 | 37,459 | |||||||||||
| Coxilha Seca | RS | Wind | May-14 | Dec-15 | May-49 | 30.00 | 13.20 | 20,632 | 23,398 | 24,225 | 20,769 | |||||||||||
| Capão do Inglês | RS | Wind | May-14 | Dec-15 | May-49 | 10.00 | 4.50 | 7,514 | 8,269 | 9,077 | 7,813 | |||||||||||
| Galpões | RS | Wind | May-14 | Dec-15 | May-49 | 8.00 | 3.70 | 5,895 | 6,793 | 7,389 | 6,011 | |||||||||||
| II.1.2.4 Solar Generation Assets and Generated Energy – Projects under Full Responsibility | ||||||||||||||||||||||
| AXIA Energia Company | Project | Location | Source | Start of Concession | Start of Operation | End of Operation | Installed Capacity | Physical Guarantee | Generated Energy (MWh) | |||||||||||||
| (State) | (MW) | (Average MW) | 1Q25 | 2Q25 | 3Q25 | 4Q25 | ||||||||||||||||
| AXIA Energia Sul | Solar Megawatt | SC | Solar | - | Jan-15 | - | 0.93 | 0.13 | 306 | 203 | 216 | 309 | ||||||||||
| (2) Decree No. 85,983, of May 6, 1981. Grant to FURNAS - Centrais Elétricas S.A. concession for a set of use of hydraulic energy of the stretch of the main course of the Tocantins River and its tributaries on the right and left banks, in the State of Goiás. 11.12.2004 - CA 05/2004 - HPP Serra da Mesa | ||||||||||||||||||||||
| (3) Shared HPPs, but FURNAS acquires the partner fraction through energy purchase contracts - considered GF and total generation of each HPP. | ||||||||||||||||||||||
| (4) The reported amounts refer to the Company's participation in the enterprise (Consórcio Governador Jayme Canet Júnior 49% Eletrosul). | ||||||||||||||||||||||
| (5)Ordinance MME 331 of 08.14.2018 - Dou 08.15.2018, Authorize the decontracting, in its entirety, of the Thermoelectric Generating Power Plant called TPP Araguaia. Eletronorte, through CE-CRR-0118, of 06.20.2018, requested ANEEL to revoke the authorization grant of TPP Araguaia. However, the Association of Municipalities of Araguaia - AMA filed Public Civil Action No. 2803-97.2018.811.008 against Eletronorte in the Court and Justice of Mato Grosso, having been granted urgent relief. Eletronorte, through CE-CRR-0144, dated 08.07.2018, requested ANEEL to suspend the process. On 10.11.2018 Eletronorte filed a lawsuit before the Federal Court (Case No. 1021506-05.2018.4.01.3400) to discuss the matter but still pending judgment. By determination of RD-0249/2019 of 08.08.2019, Eletronorte through CE-CRR-0157/2019 of 08.30.2019 requested SCG/ANEEL to resume the process aiming at the revocation of the authorization grant of TPP Araguaia, pursuant to MME Ordinance No. 331 of 08.14.2018. On 11.06.2019, SCG/ANEEL requested Eletronorte to demonstrate that said Public Civil Action has no more effects. Through correspondence s/n of 11.11.2019, Eletronorte's Legal Counsel presented the requested clarifications. SCG/ANEEL sent Memorandum No. 281/2019-SCG/ANEEL to the Federal Attorney's Office with ANEEL. Considering that there was no manifestation, Eletronorte reiterated the claim of CE-CRR-0157/2019, through CE-CRR-0079/2020, of 05.26.2020. Eletronorte, through letter CE-PR-0077/2021, of 06/17/2021, informed that it carried out the administrative closure of the Contract and completed the demobilization of the plant in June/2020. |
||||||||||||||||||||||
| (6) TPP Senador Arnon Afonso Farias de Mello is assigned to Roraima Energia S.A., successor of Boa Vista Energia S.A., through a loan agreement. This project is not being considered in the installed capacity of Eletronorte. | ||||||||||||||||||||||
| (7) According to Ordinance No. 854/2025, of the Ministry of Mines and Energy (MME), the concession has been extended for a period of 20 years from July 8, 2015. The transfer process is under review by MME and ANEEL. | ||||||||||||||||||||||
| (8) Decree No. 52,394 of 08/22/1963 - authorizes Companhia Hidreletrica do Vale do Paraiba to assemble a thermoelectric plant. Decree No. 60,350 of 03/10/1967 - grants to Central Elétrica de Furnas S.A. a concession for the use of hydraulic energy, authorization for the establishment of a thermoelectric plant and other measures. | ||||||||||||||||||||||
| (9) TPP Cristiano Rocha, Manauara, Ponta Negra, Tambaqui and Jaraqui are not part of Amazonas GT's own generation assets, they belong to the Independent Energy Producers – PIE, of which Amazonas GT buys its energy and resells them to Amazonas D through purchase of energy and Sale Agreements – CCVE. These energy purchase agreements of the PIE by Amazonas GT when it ends in May/2025, by contractual force, the PIE plants will be reverted to the equity of Amazonas GT (05/05/2025 reversal of the assets of the TPPs Tambaqui and Jaraqui and 05/21/2025 reversal of the assets of the TPPs Manauara, Ponta Negra and Cristiano Rocha), and it is up to them to operate them until November 30, 2030. | ||||||||||||||||||||||
| (10) Authorizing Resolution 7,907, of 06/18/2019, makes reference to the installed power of the Casa Nova A plant, but makes no reference to the physical guarantee of such plant. This is due to the fact that the Casa Nova A Plant does not have a Physical Guarantee defined by the MME. The amount presented of 6.8 MW comes from the plant's certification study, being only one reference. | ||||||||||||||||||||||
| (11) CONCESSION AGREEMENT No. 002/2022 – ANEEL - ELETRONORTE - New concession agreement for HPPs Tucuruí, Curuá-una and Coaracy Nunes, moving to 30 years. | ||||||||||||||||||||||
| (12) The Masc. de Moraes, Corumbá I, Estreito, Funil, Furnas, Marimbondo and P. Colômbia plants were granted the concession determined by Clause Two of Concession Agreement No. 003/2022 signed between Furnas and ANEEL on 06/17/2022 as the date of signature of the contract: 06/17/2022; the final term of the concession on 06/17/2052 was determined in Annex II of Concession Agreement No. 003/2022 signed between Furnas and ANEEL on 06/17/2022. | ||||||||||||||||||||||
| (13) By means of Order No. 481, of February 23, 2023, ANEEL released the generating unit and UG31, of 150,000.00 kW of TPP Santa Cruz to start commercial operation as of February 24, 2023. Through Order No. 1991, of June 23, 2023, ANEEL extended, for an indefinite period, the commercial operation of the generating unit and UG31, of 150,000.00 kW of TPP Santa Cruz. | ||||||||||||||||||||||
| (14) Alteration of Physical Guarantee through Ordinance No. 709/GM/MME, of November 30, 2022. | ||||||||||||||||||||||
| (15) According to Ordinance No. 409, of November 13, 2020, of the Ministry of Mines and Energy (MME), as of January 1, 2021, Furnas was designated as responsible for the Provision of the Electric Power Generation Service through the Jaguari Hydroelectric Power Plant, until the assumption of the winning utility company of the Plant bidding. | ||||||||||||||||||||||
| (16) According to concession and REH 2,932/2021. It is noteworthy that Authorizing Resolution No. 14.435/2023 added 469 days to the concession term. Therefore, the additional time granted by REH 2.932/2021, of 1,789 days, which would result in maturity on 09/07/2048, will need to be recalculated and approved by Aneel. New deadline according to Approval Resolution No. 3.242/2023. | ||||||||||||||||||||||
| (17) 23 generating units released for commercial operation totaling 96.6 MW. | ||||||||||||||||||||||
| (18) 25 generating units released for commercial operation totaling 105 MW. | ||||||||||||||||||||||
| (19) 15 generating units released for commercial operation totaling 63 MW. | ||||||||||||||||||||||
| (20) Plants with ownership transferred by Aneel order No. 151/2025, the assets were considered in 1Q25 due to the transfer operation still in progress. | ||||||||||||||||||||||
| II.1.2.1.2 Generation Losses - % | ||||||||||||||||||||||
| AXIA Energia Companies | 1Q25 | 2Q25 | 3Q25 | 4Q25 | ||||||||||||||||||
| In the quarter | Accumulated | In the quarter | Accumulated | In the quarter | Accumulated | In the quarter | Accumulated | |||||||||||||||
| AXIA Energia Norte | 2.84 | 2.84 | 2.80 | 2.82 | 2.26 | 2.71 | 2.34 | 2.62 | ||||||||||||||
| AXIA Energia Nordeste | 2.92 | 2.92 | 2.83 | 2.87 | 2.33 | 2.72 | 2.36 | 2.63 | ||||||||||||||
| AXIA Energia | 2.51 | 2.51 | 2.42 | 2.47 | 2.02 | 2.30 | 2.06 | 2.24 | ||||||||||||||
| AXIA Energia Sul | 2.42 | 2.42 | 2.06 | 2.25 | 1.53 | 2.03 | 1.46 | 1.92 | ||||||||||||||
| Hydraulic Generation Assets and Generated Energy – Projects under Full Responsibility under O&M Regime - renewed by law 14.182/21 | |||||||||||||
| AXIA Energia Company | Project | Location | Source | Start of Concession | Start of Operation | End of Operation | Installed Capacity | Total Physical Guarantee | Decoupled Physical Guarantee (6) | Total Generated Energy (MWh) | |||
| (State) | (MW) | (Average MW) | (Average MW) | 1Q25 | 2Q25 | 3Q25 | 4Q25 | ||||||
| AXIA Energia Norte | Coaracy Nunes (2) | AP | Hydraulics | Jun-22 | Dec-75 | Jun-59 | 78.00 | 62.20 | 37.32 | 131,920 | 100,167 | 123,414 | 88,035 |
| AXIA Energia Nordeste | Funil (1) | BA | Hydraulics | Jun-22 | Dec-75 | Jun-59 | 30.00 | 4.80 | 2.92 | 11,503 | 11,810 | 8,224 | 8,439 |
| Pedra (1) | BA | Hydraulics | Jun-22 | Nov-78 | Jun-52 | 20.01 | 1.74 | 1.06 | 6,340 | 4,307 | 3,616 | 3,464 | |
| Complexo de Paulo Afonso (1) | BA | Hydraulics | Jun-22 | Oct-61 | Jun-52 | 4,279.60 | 1,658.80 | 1,009.94 | 2,325,868 | 2,450,050 | 1,913,502 | 2,194,050 | |
| Luiz Gonzaga (Itaparica) (1) | PE | Hydraulics | Jun-22 | Jan-88 | Jun-52 | 1,479.60 | 727.00 | 442.62 | 1,042,521 | 1,124,435 | 895,485 | 967,564 | |
| Boa Esperança (Castelo Branco) (1) | PI | Hydraulics | Jun-22 | Oct-70 | Jun-52 | 237.30 | 136.20 | 82.92 | 335,264 | 230,015 | 238,256 | 271,555 | |
| Xingó (1) | SE | Hydraulics | Jun-22 | Dec-94 | Jun-52 | 3,162.00 | 1,729.80 | 1,053.17 | 2,625,793 | 2,745,578 | 2,178,885 | 2,437,929 | |
| AXIA Energia | Furnas (3) | MG | Hydraulics | Jun-22 | Sep-63 | Jun-52 | 1,216.00 | 625.00 | 375.00 | 560,621 | 929,093 | 1,209,295 | 1,005,132 |
| Luis Carlos Barreto (Estreito) (3) | SP/MG | Hydraulics | Jun-25 | Mar-69 | Jun-52 | 1,050.00 | 497.20 | 298.32 | 583,874 | 688,788 | 806,481 | 856,921 | |
| Porto Colômbia (3) | MG/SP | Hydraulics | Jun-22 | Jun-73 | Jun-52 | 320.00 | 205.40 | 123.24 | 344,233 | 310,968 | 300,234 | 341,893 | |
| Marimbondo (3) | SP/MG | Hydraulics | Jun-22 | Oct-75 | Jun-52 | 1,440.00 | 688.70 | 413.22 | 1,610,405 | 1,003,534 | 846,001 | 942,946 | |
| Funil (3) | RJ | Hydraulics | Jun-22 | Mar-70 | Jun-52 | 216.00 | 102.40 | 61.44 | 187,967 | 169,126 | 190,832 | 185,474 | |
| Corumbá I (3) | GO | Hydraulics | Jun-22 | Oct-96 | Jun-52 | 375.00 | 219.50 | 131.70 | 642,337 | 321,665 | 228,410 | 238,358 | |
| Hydraulic Generation Assets and Generated Energy – Projects under Full Responsibility renewed by law 13.182/15 | |||||||||||||
| AXIA Energia Company | Project | Location | Source | Start of Concession | Start of Operation | End of Operation | Installed Capacity | Total Physical Guarantee | Physical Guarantee (Law 13,182) | Total Generated Energy (MWh) | |||
| (State) | (MW) | (Average MW) | (Average MW) | 1Q25 | 2Q25 | 3Q25 | 4Q25 | ||||||
| AXIA Energia Nordeste | Sobradinho (1) (4) | BA | Hydraulics | Jun-22 | Mar-82 | Jun-52 | 1,050.30 | 457.50 | 411.75 | 619,771 | 779,322 | 494,067 | 447,221 |
| Funil (4) | BA | Hydraulics | Jun-22 | Dec-75 | Jun-59 | 78.00 | 62.20 | 0.11 | 11,503 | 11,810 | 8,224 | 8,439 | |
| Pedra (4) | BA | Hydraulics | Jun-22 | Nov-78 | Jun-52 | 20.01 | 1.74 | 0.04 | 6,340 | 4,307 | 3,616 | 3,464 | |
| Complexo de Paulo Afonso (4) | BA | Hydraulics | Jun-22 | Oct-61 | Jun-52 | 4,279.60 | 1,658.80 | 36.66 | 2,325,868 | 2,450,050 | 1,913,502 | 2,194,050 | |
| Luiz Gonzaga (Itaparica) (4) | PE | Hydraulics | Jun-22 | Jan-88 | Jun-52 | 1,479.60 | 727.00 | 16.07 | 1,042,521 | 1,124,435 | 895,485 | 967,564 | |
| Boa Esperança (Castelo Branco) (4) | PI | Hydraulics | Jun-22 | Oct-70 | Jun-52 | 237.30 | 136.20 | 3.01 | 335,264 | 230,015 | 238,256 | 271,555 | |
| Xingó (4) | SE | Hydraulics | Jun-22 | Dec-94 | Jun-52 | 3,162.00 | 1,729.80 | 38.23 | 2,625,793 | 2,745,578 | 2,178,885 | 2,437,929 | |
| AXIA Energia | Itumbiara (3) (5) | GO/MG | Hydraulics | Jun-22 | Dec-75 | Jun-52 | 2,082.00 | 948.90 | 759.12 | 1,570,701 | 1,168,313 | 1,761,730 | 1,932,795 |
| (1) The hydraulic plants had their old concession contract 006/2004 replaced by the new concession contract 001/2022. The new concessions were granted through the privatization of AXIA Energia, under the terms of Law 14,182, of July 12, 2021. | |||||||||||||
| (2) CONCESSION AGREEMENT No. 002/2022 – ANEEL - ELETRONORTE - New concession agreement for HPPs Tucuruí, Curuá-una and Coaracy Nunes, moving to 30 years. | |||||||||||||
| (3) The plants of Corumbá I, Estreito, Funil, Furnas, Marimbondo, P. Colombia and Itumbiara were granted the concession determined by Clause Two of the Concession Agreement No. 003/2022 signed between Furnas and ANEEL on 06/17/2022 as the date of signature of the agreement: 06/17/2022; the final term of the concession on 06/17/2052 was determined in Annex II of Concession Agreement No. 003/2022 signed between Furnas and ANEEL on 06/17/2022. | |||||||||||||
| (4) To comply with Law 13.182/2015, Sobradinho plant provides 90% of its Physical Guarantee and the other CHESF shareholder plants provide 2.21% of their physical guarantees to serve industrial consumers served by this law. | |||||||||||||
| (5) In order to comply with Law 13.182/2015, the Itumbiara plant provides 80% of its Physical Guarantee to serve industrial consumers located in the Southeast/Midwest submarket. | |||||||||||||
| (6) decoupling is equivalent to 60% of the total value of the physical guarantee for the year 2025. | |||||||||||||
| ACR Contracts - Quantity | ||||||||||
| AXIA Energia Company | Auction (if Bilateral Contract Regulated inform client) |
Compromised Plants | Source | Start Date | End Date | Submarket | Current Volume (MWaverage) |
Price Updated (BRL/MWh) |
Accounting Position (Procurement /Supply) |
Indexed |
| AXIA Energia Norte | CBR - OC 87495/2013 (Amazonas D) | Balbina (Own) | HYDRO | 5/1/2013 | 3/1/2027 | N | 130.32 | 438.65 | Procurement | IPCA |
| 11th New Energy Auction | Teles Pires | HYDRO | 1/1/2015 | 12/31/2044 | SE | 576.00 | 139.66 | Procurement | IPCA | |
| AXIA Energia Sul | 1st New Energy Auction | Passo São João | HYDRO | 1/1/2010 | 12/31/2039 | S | 37.00 | 326.14 | Procurement | IPCA |
| 5th New Energy Auction | São Domingos | HYDRO | 1/1/2012 | 12/31/2041 | SE/CO | 36.00 | 342.22 | Procurement | IPCA | |
| 2nd Reserve Energy Auction | CERRO CHATO I | EOL | 7/1/2012 | 6/30/2032 | S | 10.68 | 320.09 | Procurement | IPCA | |
| 2nd Reserve Energy Auction | CERRO CHATO II | EOL | 7/1/2012 | 6/30/2032 | S | 10.97 | 311.49 | Procurement | IPCA | |
| 2nd Reserve Energy Auction | CERRO CHATO III | EOL | 7/1/2012 | 6/30/2032 | S | 10.97 | 303.12 | Procurement | IPCA | |
| 5th Reserve Energy Auction | Acauã | EOL | 9/1/2015 | 8/31/2035 | NE | 2.60 | 204.34 | Procurement | IPCA | |
| AXIA Energia Nordeste | 5th Reserve Energy Auction | Angical 2 | EOL | 9/1/2015 | 8/31/2035 | NE | 4.90 | 204.34 | Procurement | IPCA |
| 5th Reserve Energy Auction | Arapapá | EOL | 9/1/2015 | 8/31/2035 | NE | 1.90 | 204.34 | Procurement | IPCA | |
| 5th Reserve Energy Auction | Caititu 2 | EOL | 9/1/2015 | 8/31/2035 | NE | 5.10 | 204.34 | Procurement | IPCA | |
| 5th Reserve Energy Auction | Caititu 3 | EOL | 9/1/2015 | 8/31/2035 | NE | 4.70 | 204.34 | Procurement | IPCA | |
| 5th Reserve Energy Auction | Carcará | EOL | 9/1/2015 | 8/31/2035 | NE | 4.60 | 204.34 | Procurement | IPCA | |
| 5th Reserve Energy Auction | Corrupião 3 | EOL | 9/1/2015 | 8/31/2035 | NE | 4.20 | 204.34 | Procurement | IPCA | |
| 5th Reserve Energy Auction | Teiú 2 | EOL | 9/1/2015 | 8/31/2035 | NE | 3.70 | 204.34 | Procurement | IPCA | |
| 32nd Existing Energy Auction A-1 | AXIA Energia Nordeste | ANY | 1/1/2025 | 12/31/2026 | NE | 317.03 | 160.91 | Procurement | N/A | |
| 33rd Existing Energy Auction A-2 | AXIA Energia Nordeste | ANY | 1/1/2026 | 12/31/2027 | NE | 80.00 | 160.05 | Procurement | N/A | |
| 1st New Energy Auction | Manso | HYDRO | 1/1/2008 | 12/31/2037 | SE/CO | 34.47 | 316.93 | Procurement | IPCA | |
| AXIA Energia Holding | 1st New Energy Auction | Manso | HYDRO | 1/1/2010 | 12/31/2039 | SE/CO | 55.00 | 320.19 | Procurement | IPCA |
| 1st New Energy Auction | Batalha | HYDRO | 1/1/2010 | 12/31/2039 | SE/CO | 47.00 | 330.36 | Procurement | IPCA | |
| 1st New Energy Auction | Simplício | HYDRO | 1/1/2010 | 12/31/2039 | SE/CO | 185.00 | 321.19 | Procurement | IPCA | |
| 10th New Energy Auction | Colider | HYDRO | 1/1/2015 | 12/31/2044 | SE/CO | 125.50 | 242.07 | Procurement | IPCA | |
| Saesa - Structuring auction | HPP Santo Antonio | HYDRO | 12/1/2012 | 12/31/2041 | SE/CO | 1,551.24 | 210.56 | Procurement | IPCA | |
| Saesa - 19th New Energy Auction | HPP Santo Antonio Expansion | HYDRO | 1/1/2017 | 12/31/2046 | SE/CO | 129.60 | 217.45 | Procurement | IPCA | |
| 1st New Energy Auction | HPP Baguari | HYDRO | 1/1/2010 | 12/31/2039 | SE/CO | 77.00 | 332.56 | Procurement | IPCA | |
| 1st New Energy Auction | HPP Retiro Baixo | HYDRO | 1/1/2009 | 12/31/2038 | SE/CO | 36.00 | 314.96 | Procurement | IPCA | |
| (1) Energy sales contracts resulting from the process of unbundling of Amazonas Distribuidora -> Process: 48500.004245/2012-43 -ANEEL. The amounts of energy traded come from the purchase of PIEs. | ||||||||||
| (2) The sales contracts for PIEs and TPP Aparecida (originally a contract for availability) became Reserve Energy Contracts, according to MP1232/2024. | ||||||||||
| ACR Contracts - Availability | ||||||||||
| AXIA Energia Company | Auction (if Bilateral Contract Regulated inform client) |
Compromised Plants | Source | Start Date | End Date | Submarket | Current Volume (MWaverage) |
Updated Fixed Revenue (BRL thousand/year) |
Accounting Position (Procurement /Supply) |
Indexed |
| AXIA Energia Sul | 17th New Energy Auction | WPP Coxilha Seca | EOL | 1/1/2016 | 12/31/2035 | S | 8.30 | 17,455.74 | Procurement | IPCA |
| 17th New Energy Auction | WPP Capão do Inglês | EOL | 1/1/2016 | 12/31/2035 | S | 2.80 | 5,903.89 | Procurement | IPCA | |
| 17th New Energy Auction | WPP Galpões | EOL | 1/1/2016 | 12/31/2035 | S | 2.10 | 4,460.11 | Procurement | IPCA | |
| AXIA Energia Nordeste | 18th New Energy Auction | Casa Nova II | EOL | 1/1/2018 | 12/31/2037 | NE | 7.10 | 14,940.31 | Procurement | IPCA |
| 18th New Energy Auction | Casa Nova III | EOL | 2/28/2018 | 12/31/2037 | NE | 5.50 | 11,570.22 | Procurement | IPCA | |
| 17th New Energy Auction | Coqueirinho 2 | EOL | 1/1/2016 | 12/31/2035 | NE | 7.30 | 14,946.79 | Procurement | IPCA | |
| 17th New Energy Auction | Papagaio | EOL | 1/1/2016 | 12/31/2035 | NE | 4.70 | 9,586.02 | Procurement | IPCA | |
| 18th New Energy Auction | Tamanduá Mirim 2 | EOL | 5/1/2018 | 12/31/2037 | NE | 7.20 | 14,451.90 | Procurement | IPCA | |
| AXIA Energia | 5th New Energy Auction | Santa Cruz Nova | TERM | 1/1/2012 | 12/31/2026 | SE/CO | 245.70 | 343,259.84 | Procurement | IPCA |
| 13º Leilão de Energia Nova | Jandaia | EOL | 11/1/2019 | 11/1/2039 | NE | 11.70 | 23,632.19 | Procurement | IPCA | |
| 13º Leilão de Energia Nova | Jandaia I | EOL | 11/1/2019 | 11/1/2039 | NE | 8.70 | 17,434.33 | Procurement | IPCA | |
| 13º Leilão de Energia Nova | Nossa Senhora de Fátima | EOL | 11/1/2019 | 11/1/2039 | NE | 11.20 | 22,552.69 | Procurement | IPCA | |
| 13º Leilão de Energia Nova | São Clemente | EOL | 11/1/2019 | 11/1/2039 | NE | 8.20 | 16,523.78 | Procurement | IPCA | |
| 13º Leilão de Energia Nova | EOL São Januário | EOL | 11/1/2019 | 11/1/2039 | NE | 7.90 | 15,839.84 | Procurement | IPCA | |
| PIEs resulting from the process of deverticalization of Amazonas Distribuidora | ||||||||||||||
| The purchase of energy and Sale Agreements from the PIEs (quantity contracts) are due to the process of unbundling of Amazonas Distribuidora -> Process: 48500.004245/2012-43 -ANEEL. | ||||||||||||||
| Eletronorte buys energy from the PIEs, the price of which does not include the cost of fuel (gas). Eletronorte sells the same amount purchased from the PIEs to the distributor Amazonas Energia, including the fuel cost in the fee, so that the energy purchase and sale operations do not reflect the economic impact for Eletronorte ("pass-through"). The gas supply contact that serves the Amazon thermal plants was made between Eletronorte and Petrobras. | ||||||||||||||
| Eletronorte's energy purchase contracts for the PIEs expire in May 2025, as well as the current sales contracts for Amazonas Energia. From that date, the assets will be converted to Eletronorte. As a result of MP 855/2018, new energy sales contracts will be entered into with Amazonas Energia for supply after that date, of the CCEAR type, with a term until November 2030 (date linked to the Gas supply contract). | ||||||||||||||
| Purchase of Energy Agreements from PIEs (contracts by quantity) | ||||||||||||||
| 1Q25 | 2Q25 | 3Q25 | 4Q25 | |||||||||||
| AXIA Energia Company | Counterparty | Compromised Plants | Source | Start Date | End Date | Submarket | Current Volume (MWaverage) |
Price Updated (BRL/MWh) |
Accounting Position (Procurement /Supply) |
Indexed | BRL Million | BRL Million | BRL Million | BRL Million |
| AXIA Energia Norte | PIE Tambaqui | Tambaqui | TERM | 7/1/2021 | 5/18/2025 | N | 60.00 | 451.04 | Procurement | IGP-M | 61,926.25 | 22,687.12 | N/A | N/A |
| PIE Jaraqui | Jaraqui | TERM | 7/1/2021 | 5/18/2025 | N | 60.00 | 451.50 | Procurement | IGP-M | 62,004.48 | 22,671.74 | N/A | N/A | |
| PIE Manauara | Manauara | TERM | 7/1/2021 | 5/18/2025 | N | 60.00 | 405.20 | Procurement | IGP-M | 55,787.32 | 30,072.80 | N/A | N/A | |
| PIE Gera | Ponta Negra | TERM | 7/1/2021 | 5/18/2025 | N | 60.00 | 420.96 | Procurement | IGP-M | 57,870.21 | 31,148.68 | N/A | N/A | |
| PIE Cristiano Rocha | Cristiano Rocha | TERM | 7/1/2021 | 5/18/2025 | N | 65.00 | 438.37 | Procurement | IGP-M | 65,393.79 | 35,248.32 | N/A | N/A | |
| PIE Coari | Coari | TERM | 1/3/2020 | 11/30/2030 | N | 13.88 | 430.17 | Procurement | IGP-M | 13,288.53 | 8,910.49 | N/A | N/A | |
| Energy Sale Contracts, from the Energy Purchases of the PIEs, for the distributor (quantity contracts) | ||||||||||||||
| 1Q25 | 2Q25 | 3Q25 | 4Q25 | |||||||||||
| AXIA Energia Company | Auction (if Bilateral Contract Regulated inform client) |
Compromised Plants | Source | Start Date | End Date | Submarket | Current Volume (MWaverage) |
Price Updated (BRL/MWh) |
Accounting Position (Procurement /Supply) |
Indexed | BRL Thousand | BRL Thousand | BRL Thousand | BRL Thousand |
| AXIA Energia Norte | Reserve Power Auction (MP1232/2024) | Tambaqui | TERM | 6/13/2024 | 5/18/2025 | N | 60.00 | 1216.56 | Procurement | IPCA | 158,738.82 | 73,767.24 | N/A | N/A |
| Reserve Power Auction (MP1232/2024) | Jaraqui | TERM | 6/13/2024 | 5/18/2025 | N | 60.00 | 1209.91 | Procurement | IPCA | 158,765.19 | 72,994.49 | N/A | N/A | |
| Reserve Power Auction (MP1232/2024) | Manauara | TERM | 6/13/2024 | 5/18/2025 | N | 60.00 | 1090.65 | Procurement | IPCA | 144,746.37 | 84,811.60 | N/A | N/A | |
| Reserve Power Auction (MP1232/2024) | Ponta Negra | TERM | 6/13/2024 | 5/18/2025 | N | 60.00 | 1144.53 | Procurement | IPCA | 146,999.87 | 85,348.08 | N/A | N/A | |
| Reserve Power Auction (MP1232/2024) | Cristiano Rocha | TERM | 6/13/2024 | 5/18/2025 | N | 65.00 | 1143.76 | Procurement | IPCA | 158,753.61 | 85,573.36 | N/A | N/A | |
| CCESI 001/2019 (Amazonas D - Sist. Isolated) | Coari | TERM | 1/3/2020 | 11/30/2030 | N | 13.88 | 992.80 | Procurement | IPCA | 29,240.29 | 14,929.76 | N/A | N/A | |
| ACR Contracts - Availability - Thermal | ||||||||||||||
| 1Q25 | 2Q25 | 3Q25 | 4Q25 | |||||||||||
| AXIA Energia Company | Auction (if Bilateral Contract Regulated inform client) |
Compromised Plants | Source | Start Date | End Date | Submarket | Current Volume (MWaverage) |
Updated Fixed Revenue (BRL thousand/year) |
Accounting Position (Procurement /Supply) |
Indexed | BRL Million | BRL Million | BRL Million | BRL Million |
| AXIA Energia Norte | 20th New Energy Auction | Mauá 3 | TERM | 1/1/2019 | 11/30/2030 | N | 484.4 | 1,445,433.23 | Procurement | IPCA | 342,839.53 | 119,142.25 | N/A | N/A |
| AXIA Energia Holding | 5th New Energy Auction | Santa Cruz Nova | TERM | 1/1/2012 | 12/31/2026 | SE/CO | 245.70 | 343,259.84 | Procurement | IPCA | 91,461.62 | 98,320.84 | 202,266.63 | 182800.80 |
| (1) The contract for the sale of TPP Aparecida (originally contract for availability) became a Reserve Energy contract, according to MP1232/2024, as of 06/13/2024. | ||||||||||||||
| CVU and Thermal Inflexibility with Availability Contracts | ||||||||||||||
| AXIA Energia Company | Power plant | Installed Capacity | 1Q25 | 2Q25 | 3Q25 | 4Q25 | ||||||||
| (MW) | Average inflexibility (MWavg) | Average CVU (BRL/MWh) |
Average inflexibility (MWavg) | Average CVU (BRL/MWh) |
Average inflexibility (MWavg) | Average CVU (BRL/MWh) |
Average inflexibility (MWavg) | Average CVU (BRL/MWh) |
||||||
| AXIA Energia Norte | TPP MAUÁ 3 | 590.8 | 252.1 | 126.4 | 252.1 | 134.6 | N/A | N/A | N/A | N/A | ||||
| AXIA Energia Holding | TPP Santa Cruz | 500.0 | 0 | 273.43 | 0 | 249.51 | 0 | 216.02 | N/A | 216.02 | ||||
| AXIA Energia | Total AXIA Energia | Unit | 1Q25 | 2Q25 | 3Q25 | 4Q25 |
| Physical Guarantee | MWaverage | 947.98 | 947.98 | 947.98 | 1,085.03 | |
| GAG O&M | BRL million | 42.97 | 42.97 | 44.98 | 57.60 | |
| GAG Improvements | BRL million | 45.29 | 45.29 | 45.59 | 59.54 | |
| CAIMI | BRL million | 5.35 | 5.35 | 5.64 | 7.24 | |
| Adjustment by Unavailability | BRL million | 5.06 | 5.06 | 5.19 | 7.60 | |
| R&D | BRL million | 1.49 | 1.49 | 1.53 | 2.01 | |
| Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) | BRL million | 30.97 | 26.87 | 20.18 | 42.89 | |
| CFURH | BRL million | 27.99 | 28.97 | 25.52 | 23.45 | |
| PIS/COFINS | BRL million | 16.51 | 16.65 | 16.88 | 21.78 | |
| TOTAL | BRL million | 175.63 | 172.67 | 165.50 | 222.12 | |
| AXIA Energia | Unit | 1Q25 | 2Q25 | 3Q25 | 4Q25 | |
| Physical Guarantee | MWaverage | 250.00 | 250.00 | 250.00 | 250.00 | |
| GAG O&M | BRL million | 10.62 | 10.62 | 11.11 | 11.11 | |
| GAG Improvements | BRL million | 9.36 | 9.36 | 9.54 | 9.54 | |
| CAIMI | BRL million | 1.38 | 1.38 | 1.46 | 1.46 | |
| Adjustment by Unavailability | BRL million | 1.45 | 1.45 | 1.31 | 1.31 | |
| R&D | BRL million | 0.36 | 0.36 | 0.37 | 0.37 | |
| Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) | BRL million | 10.16 | 6.89 | 4.70 | 5.19 | |
| CFURH | BRL million | 3.25 | 7.35 | 7.47 | 7.31 | |
| PIS/COFINS | BRL million | 3.81 | 4.00 | 4.11 | 4.10 | |
| TOTAL | BRL million | 40.40 | 41.40 | 40.06 | 40.39 | |
| Luis Carlos Barreto (Estreito) | Unit | 1Q25 | 2Q25 | 3Q25 | 4Q25 | |
| Physical Guarantee | MWaverage | 198.88 | 198.88 | 198.88 | 198.88 | |
| GAG O&M | BRL million | 8.70 | 8.70 | 9.11 | 9.11 | |
| GAG Improvements | BRL million | 10.28 | 10.28 | 10.27 | 10.27 | |
| CAIMI | BRL million | 1.19 | 1.19 | 1.26 | 1.26 | |
| Adjustment by Unavailability | BRL million | 1.22 | 1.22 | 1.39 | 1.39 | |
| R&D | BRL million | 0.34 | 0.34 | 0.35 | 0.35 | |
| Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) | BRL million | 9.02 | 7.46 | 5.97 | 6.66 | |
| CFURH | BRL million | 4.27 | 5.50 | 5.32 | 5.33 | |
| PIS/COFINS | BRL million | 3.63 | 3.70 | 3.80 | 3.80 | |
| TOTAL | BRL million | 38.66 | 38.41 | 37.46 | 38.17 | |
| Porto Colômbia | Unit | 1Q25 | 2Q25 | 3Q25 | 4Q25 | |
| Physical Guarantee | MWaverage | 82.16 | 82.16 | 82.16 | 82.16 | |
| GAG O&M | BRL million | 3.77 | 3.77 | 3.95 | 3.95 | |
| GAG Improvements | BRL million | 4.12 | 4.12 | 4.36 | 4.36 | |
| CAIMI | BRL million | 0.36 | 0.36 | 0.38 | 0.38 | |
| Adjustment by Unavailability | BRL million | -0.01 | -0.01 | 0.20 | 0.20 | |
| R&D | BRL million | 0.10 | 0.10 | 0.11 | 0.11 | |
| Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) | BRL million | 0.33 | 0.04 | -0.33 | 0.00 | |
| CFURH | BRL million | 2.63 | 2.59 | 2.18 | 1.74 | |
| PIS/COFINS | BRL million | 1.18 | 1.18 | 1.23 | 1.21 | |
| TOTAL | BRL million | 12.48 | 12.16 | 12.08 | 11.95 | |
| Marimbondo | Unit | 1Q25 | 2Q25 | 3Q25 | 4Q25 | |
| Physical Guarantee | MWaverage | 275.48 | 275.48 | 275.48 | 275.48 | |
| GAG O&M | BRL million | 11.66 | 11.66 | 12.21 | 12.21 | |
| GAG Improvements | BRL million | 13.93 | 13.93 | 13.67 | 13.67 | |
| CAIMI | BRL million | 1.64 | 1.64 | 1.73 | 1.73 | |
| Adjustment by Unavailability | BRL million | 2.19 | 2.19 | 2.25 | 2.25 | |
| R&D | BRL million | 0.47 | 0.47 | 0.48 | 0.48 | |
| Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) | BRL million | 10.21 | 10.62 | 8.03 | 10.88 | |
| CFURH | BRL million | 11.50 | 8.98 | 6.99 | 5.02 | |
| PIS/COFINS | BRL million | 5.34 | 5.27 | 5.21 | 5.13 | |
| TOTAL | BRL million | 56.94 | 54.76 | 50.56 | 51.36 | |
| Funil | Unit | 1Q25 | 2Q25 | 3Q25 | 4Q25 | |
| Physical Guarantee | MWaverage | 40.96 | 40.96 | 40.96 | 40.96 | |
| GAG O&M | BRL million | 2.71 | 2.71 | 2.83 | 2.83 | |
| GAG Improvements | BRL million | 2.49 | 2.49 | 2.50 | 2.50 | |
| CAIMI | BRL million | 0.25 | 0.25 | 0.26 | 0.26 | |
| Adjustment by Unavailability | BRL million | 0.07 | 0.07 | 0.07 | 0.07 | |
| R&D | BRL million | 0.07 | 0.07 | 0.07 | 0.07 | |
| Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) | BRL million | 0.26 | 0.19 | -0.24 | 0.38 | |
| CFURH | BRL million | 1.50 | 1.29 | 1.45 | 0.99 | |
| PIS/COFINS | BRL million | 0.76 | 0.76 | 0.79 | 0.77 | |
| TOTAL | BRL million | 8.11 | 7.82 | 7.73 | 7.87 | |
| Corumbá I | Unit | 1Q25 | 2Q25 | 3Q25 | 4Q25 | |
| Physical Guarantee | MWaverage | 87.80 | 87.80 | 87.80 | 87.80 | |
| GAG O&M | BRL million | 3.86 | 3.86 | 4.04 | 4.04 | |
| GAG Improvements | BRL million | 3.85 | 3.85 | 3.92 | 3.92 | |
| CAIMI | BRL million | 0.43 | 0.43 | 0.45 | 0.45 | |
| Adjustment by Unavailability | BRL million | 0.31 | 0.31 | 0.26 | 0.26 | |
| R&D | BRL million | 0.13 | 0.13 | 0.13 | 0.13 | |
| Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) | BRL million | 0.95 | 1.60 | 1.91 | 2.84 | |
| CFURH | BRL million | 4.79 | 3.23 | 1.93 | 1.14 | |
| PIS/COFINS | BRL million | 1.48 | 1.43 | 1.42 | 1.39 | |
| TOTAL | BRL million | 15.79 | 14.83 | 14.06 | 14.17 | |
| Jaguari | Unit | 1Q25 | 2Q25 | 3Q25 | 4Q25 | |
| Physical Guarantee | MWaverage | 12.70 | 12.70 | 12.70 | 12.70 | |
| GAG O&M | BRL million | 1.65 | 1.65 | 1.74 | 1.74 | |
| GAG Improvements | BRL million | 1.26 | 1.26 | 1.33 | 1.33 | |
| CAIMI | BRL million | 0.10 | 0.10 | 0.10 | 0.10 | |
| Adjustment by Unavailability | BRL million | -0.16 | -0.16 | -0.30 | -0.30 | |
| R&D | BRL million | 0.03 | 0.03 | 0.03 | 0.03 | |
| Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) | BRL million | 0.04 | 0.07 | 0.14 | 0.14 | |
| CFURH | BRL million | 0.04 | 0.03 | 0.19 | 0.11 | |
| PIS/COFINS | BRL million | 0.30 | 0.31 | 0.33 | 0.33 | |
| TOTAL | BRL million | 3.26 | 3.28 | 3.56 | 3.48 | |
| Três Irmãos | Unit | 1Q25 | 2Q25 | 3Q25 | 4Q25 | |
| Physical Guarantee | MWaverage | 137.05 | ||||
| GAG O&M | BRL million | 12.62 | ||||
| GAG Improvements | BRL million | 13.95 | ||||
| CAIMI | BRL million | 1.60 | ||||
| Adjustment by Unavailability | BRL million | 2.41 | ||||
| R&D | BRL million | 0.48 | ||||
| Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) | BRL million | 16.80 | ||||
| CFURH | BRL million | 1.80 | ||||
| PIS/COFINS | BRL million | 5.06 | ||||
| TOTAL | BRL million | 0.00 | 0.00 | 0.00 | 54.73 | |
| Eletronorte | Total AXIA Energia Norte | Unit | 1Q25 | 2Q25 | 3Q25 | 4Q25 |
| Physical Guarantee | MWaverage | 24.88 | 24.88 | 24.88 | 24.88 | |
| GAG O&M | BRL million | 1.41 | 1.42 | 1.48 | 1.48 | |
| GAG Improvements | BRL million | 1.23 | 1.24 | 1.27 | 1.27 | |
| CAIMI | BRL million | 0.09 | 0.09 | 0.09 | 0.09 | |
| Adjustment by Unavailability | BRL million | 0.18 | 0.18 | 0.15 | 0.15 | |
| R&D | BRL million | 0.04 | 0.04 | 0.03 | 0.03 | |
| Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) | BRL million | 0.09 | 0.03 | -0.82 | -0.57 | |
| CFURH | BRL million | 0.91 | 0.79 | 0.90 | 0.80 | |
| PIS/COFINS | BRL million | 0.40 | 0.40 | 0.36 | 0.35 | |
| TOTAL | BRL million | 4.34 | 4.18 | 3.46 | 3.61 | |
| Coaracy Nunes | Unit | 1Q25 | 2Q25 | 3Q25 | 4Q25 | |
| Physical Guarantee | MWaverage | 24.88 | 24.88 | 24.88 | 24.88 | |
| GAG O&M | BRL million | 1.41 | 1.42 | 1.48 | 1.48 | |
| GAG Improvements | BRL million | 1.23 | 1.24 | 1.27 | 1.27 | |
| CAIMI | BRL million | 0.09 | 0.09 | 0.09 | 0.09 | |
| Adjustment by Unavailability | BRL million | 0.18 | 0.18 | 0.15 | 0.15 | |
| R&D | BRL million | 0.04 | 0.04 | 0.03 | 0.03 | |
| Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) | BRL million | 0.09 | 0.03 | -0.82 | -0.57 | |
| CFURH | BRL million | 0.91 | 0.79 | 0.90 | 0.80 | |
| PIS/COFINS | BRL million | 0.40 | 0.40 | 0.36 | 0.35 | |
| TOTAL | BRL million | 4.34 | 4.18 | 3.46 | 3.61 | |
| Chesf | Total AXIA Energia Nordeste | Unit | 1Q25 | 2Q25 | 3Q25 | 4Q25 |
| Physical Guarantee | MWaverage | 1,665.70 | 1,665.70 | 1,665.70 | 1,665.71 | |
| GAG O&M | BRL million | 63.96 | 64.67 | 67.31 | 67.31 | |
| GAG Improvements | BRL million | 81.98 | 82.89 | 82.07 | 82.07 | |
| CAIMI | BRL million | 10.19 | 10.30 | 10.80 | 10.80 | |
| Adjustment by Unavailability | BRL million | 14.04 | 14.04 | 13.66 | 13.66 | |
| R&D | BRL million | 2.84 | 2.84 | 2.74 | 2.74 | |
| Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) | BRL million | 86.22 | 71.33 | 51.53 | 68.17 | |
| CFURH | BRL million | 45.85 | 51.98 | 44.04 | 27.54 | |
| PIS/COFINS | BRL million | 31.10 | 31.52 | 30.09 | 29.43 | |
| TOTAL | BRL million | 336.18 | 329.58 | 302.23 | 301.70 | |
| Funil | Unit | 1Q25 | 2Q25 | 3Q25 | 4Q25 | |
| Physical Guarantee | MWaverage | 1.88 | 1.88 | 1.88 | 1.88 | |
| GAG O&M | BRL million | 0.51 | 0.52 | 0.54 | 0.54 | |
| GAG Improvements | BRL million | 0.52 | 0.52 | 0.50 | 0.50 | |
| CAIMI | BRL million | 0.03 | 0.03 | 0.04 | 0.04 | |
| Adjustment by Unavailability | BRL million | -0.11 | -0.11 | -0.11 | -0.11 | |
| R&D | BRL million | 0.02 | 0.02 | 0.02 | 0.02 | |
| Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) | BRL million | 0.62 | 0.59 | 0.55 | 0.55 | |
| CFURH | BRL million | 0.07 | 0.10 | 0.06 | 0.05 | |
| PIS/COFINS | BRL million | 0.17 | 0.17 | 0.16 | 0.16 | |
| TOTAL | BRL million | 1.83 | 1.84 | 1.76 | 1.74 | |
| Complexo Paulo Afonso | Unit | 1Q25 | 2Q25 | 3Q25 | 4Q25 | |
| Physical Guarantee | MWaverage | 648.86 | 648.86 | 648.86 | 648.86 | |
| GAG O&M | BRL million | 32.21 | 32.57 | 33.90 | 33.90 | |
| GAG Improvements | BRL million | 42.93 | 43.41 | 41.86 | 41.86 | |
| CAIMI | BRL million | 4.74 | 4.79 | 5.02 | 5.02 | |
| Adjustment by Unavailability | BRL million | 5.33 | 5.33 | 4.41 | 4.41 | |
| R&D | BRL million | 1.38 | 1.38 | 1.32 | 1.32 | |
| Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) | BRL million | 42.59 | 36.87 | 29.28 | 35.27 | |
| CFURH | BRL million | 16.80 | 19.34 | 16.23 | 10.07 | |
| PIS/COFINS | BRL million | 14.88 | 15.07 | 14.31 | 14.06 | |
| TOTAL | BRL million | 160.86 | 158.76 | 146.33 | 145.91 | |
| Pedra | Unit | 1Q25 | 2Q25 | 3Q25 | 4Q25 | |
| Physical Guarantee | MWaverage | 0.68 | 0.68 | 0.68 | 0.68 | |
| GAG O&M | BRL million | 0.31 | 0.32 | 0.33 | 0.33 | |
| GAG Improvements | BRL million | 0.29 | 0.30 | 0.31 | 0.31 | |
| CAIMI | BRL million | 0.02 | 0.02 | 0.02 | 0.02 | |
| Adjustment by Unavailability | BRL million | -0.06 | -0.06 | -0.07 | -0.07 | |
| R&D | BRL million | 0.01 | 0.01 | 0.01 | 0.01 | |
| Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) | BRL million | 0.20 | 0.17 | 0.20 | 0.22 | |
| CFURH | BRL million | 0.05 | 0.04 | 0.03 | 0.02 | |
| PIS/COFINS | BRL million | 0.08 | 0.08 | 0.09 | 0.09 | |
| TOTAL | BRL million | 0.90 | 0.87 | 0.92 | 0.93 | |
| Luiz Gonzaga | Unit | 1Q25 | 2Q25 | 3Q25 | 4Q25 | |
| Physical Guarantee | MWaverage | 284.38 | 284.38 | 284.38 | 284.38 | |
| GAG O&M | BRL million | 10.84 | 10.96 | 11.40 | 11.40 | |
| GAG Improvements | BRL million | 13.04 | 13.19 | 13.49 | 13.49 | |
| CAIMI | BRL million | 1.64 | 1.66 | 1.73 | 1.73 | |
| Adjustment by Unavailability | BRL million | 3.13 | 3.13 | 3.29 | 3.29 | |
| R&D | BRL million | 0.47 | 0.47 | 0.46 | 0.46 | |
| Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) | BRL million | 14.13 | 11.55 | 7.58 | 10.47 | |
| CFURH | BRL million | 7.58 | 8.78 | 7.55 | 4.65 | |
| PIS/COFINS | BRL million | 5.18 | 5.26 | 5.04 | 4.93 | |
| TOTAL | BRL million | 56.01 | 54.99 | 50.54 | 50.42 | |
| Boa Esperança | Unit | 1Q25 | 2Q25 | 3Q25 | 4Q25 | |
| Physical Guarantee | MWaverage | 53.28 | 53.28 | 53.28 | 53.28 | |
| GAG O&M | BRL million | 3.07 | 3.10 | 3.23 | 3.23 | |
| GAG Improvements | BRL million | 2.58 | 2.61 | 2.71 | 2.71 | |
| CAIMI | BRL million | 0.26 | 0.27 | 0.28 | 0.28 | |
| Adjustment by Unavailability | BRL million | 0.49 | 0.49 | 0.46 | 0.46 | |
| R&D | BRL million | 0.09 | 0.09 | 0.10 | 0.10 | |
| Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) | BRL million | 1.54 | 1.25 | 1.33 | 1.87 | |
| CFURH | BRL million | 2.32 | 2.05 | 1.73 | 1.35 | |
| PIS/COFINS | BRL million | 1.06 | 1.05 | 1.09 | 1.08 | |
| TOTAL | BRL million | 11.41 | 10.91 | 10.92 | 11.06 | |
| Xingó | Unit | 1Q25 | 2Q25 | 3Q25 | 4Q25 | |
| Physical Guarantee | MWaverage | 676.63 | 676.63 | 676.63 | 676.63 | |
| GAG O&M | BRL million | 17.02 | 17.21 | 17.91 | 17.91 | |
| GAG Improvements | BRL million | 22.62 | 22.87 | 23.21 | 23.21 | |
| CAIMI | BRL million | 3.50 | 3.54 | 3.71 | 3.71 | |
| Adjustment by Unavailability | BRL million | 5.27 | 5.27 | 5.68 | 5.68 | |
| R&D | BRL million | 0.87 | 0.87 | 0.84 | 0.84 | |
| Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) | BRL million | 27.14 | 20.91 | 12.59 | 19.78 | |
| CFURH | BRL million | 19.04 | 21.67 | 18.44 | 11.39 | |
| PIS/COFINS | BRL million | 9.73 | 9.88 | 9.39 | 9.11 | |
| TOTAL | BRL million | 105.18 | 102.21 | 91.76 | 91.62 |
| Sold Energy | |||||||||
| Energy Sold by projects not renewed by Law 12.783/13 and Law 13.182/15 | |||||||||
| AXIA Energia Company | Buyer | 1Q25 | 2Q25 | 3Q25 | 4Q25 | ||||
| BRL Million | MWh | BRL Million | MWh | BRL Million | MWh | BRL Million | MWh | ||
| AXIA Energia Norte (1) | AXIA Energia System | 48.09 | 333,868 | 50.68 | 339,856 | 149.13 | 819,263 | 51 | 339,383 |
| Others | 1,985.66 | 6,579,461 | 1,439.59 | 6,188,905 | 823.67 | 4,840,489 | 979 | 5,410,510 | |
| AXIA Energia Nordeste | AXIA Energia System | 181.71 | 2,493,672 | 0.00 | 0 | 0.00 | 0 | 0 | 0 |
| Others | 285.73 | 2,048,899 | 321.87 | 2,242,635 | 284.17 | 2,021,988 | 424 | 2,578,899 | |
| AXIA Energia Holding (2) | AXIA Energia System | 137.13 | 890,528 | 141.81 | 906,841 | 166.39 | 912,030 | 164 | 906,599 |
| Others | 3,353.07 | 19,267,896 | 2,756.97 | 15,294,666 | 3,182.73 | 16,248,518 | 3,300 | 16,868,416 | |
| AXIA Energia Sul (3) | AXIA Energia System | 1.46 | 6,061 | 2.26 | 8,623 | 2.28 | 8,638 | 7 | 22,894 |
| Others | 265.86 | 1,377,136 | 281.65 | 1,389,521 | 256.08 | 1,258,543 | 244 | 1,207,398 | |
| Notes: | |||||||||
| (1) Includes the SPE consolidated by Eletronorte: HPPs Teles Pires (from 4Q25) | |||||||||
| (2) Includes SPEs previously consolidated by Furnas: HPP Santo Antônio (from 3Q22), HPPs Baguari and Retiro Baixo (from 4Q25) | |||||||||
| (3) Includes SPEs previously consolidated by CGT Eletrosul: Ibirapuitã (from 3Q25) | |||||||||
| Note: until 1Q25, sales to related parties (AXIA Energia System) were only being opened for the subsidiaries Eletronorte, Chesf, Furnas and CGT Eletrosul. | |||||||||
| As of 2Q25, all sales made between subsidiaries and consolidated SPEs, described in notes 1 and 2, are reported in the "AXIA Energia System" line. The 1Q25 data were updated considering this premise. | |||||||||
| Energy Sold by the renewed projects under Law 12.783/13 – O&M Regime | |||||||||
| AXIA Energia Company | Buyer | 1Q25 | 2Q25 | 3Q25 | 4Q25 | ||||
| BRL Million | MWh | BRL Million | MWh | BRL Million | MWh | BRL Million | MWh | ||
| AXIA Energia Norte | AXIA Energia System | ||||||||
| Others | 4.34 | 53,741 | 4.18 | 54,338 | 3.46 | 54,935 | 4 | 54,935 | |
| AXIA Energia Nordeste | AXIA Energia System | ||||||||
| Others | 336.18 | 3,597,955 | 329.58 | 3,637,932 | 302.23 | 3,677,910 | 302 | 3,677,910 | |
| AXIA Energia Holding | AXIA Energia System | ||||||||
| Others | 175.63 | 2,047,637 | 172.67 | 2,070,388 | 165.50 | 2,093,140 | 222 | 2,395,746 | |
| AXIA Energia Sul | AXIA Energia System | ||||||||
| Others | |||||||||
| Energy Sold by renewed projects under Law 13,182 | |||||||||
| AXIA Energia Company | Buyer | 1Q25 | 2Q25 | 3Q25 | 4Q25 | ||||
| BRL Million | MWh | BRL Million | MWh | BRL Million | MWh | BRL Million | MWh | ||
| AXIA Energia Norte | AXIA Energia System | ||||||||
| Others | |||||||||
| AXIA Energia Nordeste | AXIA Energia System | ||||||||
| Others | 7.70 | 42,511 | 8.17 | 41,606 | 3.83 | 16,302 | 3.68 | 10,874 | |
| AXIA Energia Holding | AXIA Energia System | ||||||||
| Others | 22 | 107,102 | 1 | 5,119 | 0.00 | 0 | 0.00 | 0 | |
| AXIA Energia Sul | AXIA Energia System | ||||||||
| Others | |||||||||
| Energy Balance | |||||||
| Energy Balance (MWavg) 4Q25 | 2025 | 2026 | 2027 | ||||
| Resources (A) | 16,996 | 16,984 | 17,833 | ||||
| Own resources (1) (2) (3) (4) (5) | 14,211 | 15,533 | 16,702 | ||||
| Hydraulic | 13,940 | 15,251 | 16,420 | ||||
| Wind | 270 | 282 | 282 | ||||
| Energy Purchase (6) | 2,785 | 1,452 | 1,130 | ||||
| Limit => | Lower | Higher | Lower | Higher | |||
| Sales (B) | 14,959 | 9,847 | 12,847 | 7,398 | 10,398 | ||
| ACR - Except quotas | 3,483 | 3,597 | 3,148 | ||||
| ACL - Bilateral Contracts + STM implemented (range) (6) | 11,476 | 6,250 | 9,250 | 4,250 | 7,250 | ||
| Average prices Contracts signed | |||||||
| Limit => | Lower | Higher | Lower | Higher | |||
| Average Price of Sales Contracts (ACR and ACL - R$/MWh) (7) | 175 | 185 | 205 | 195 | 225 | ||
| Balance (A - B) | 2,037 | 7,137 | 4,137 | 10,434 | 7,434 | ||
| Balance considering estimated hedge (8) | 0 | 4,362 | 1,362 | 7,446 | 4,446 | ||
| Uncontracted energy considering estimated hedge (8) | 0% | 26% | 8% | 42% | 25% | ||
| Contracts entered into until 12/31/2025. | |||||||
| The energy balance reflects the SPEs consolidated into AXIA Energia: Santo Antônio HPP (as of 3Q22) and Baguari and Retiro Baixo HPPs (as of 4Q23) in terms of resources, sales, and average prices. Similarly, Teles Pires HPP, an SPE consolidated into AXIA Energia Norte (as of 4Q23), is also included. | |||||||
| 1. The energy balance does not include Independent Power Producers (IPPs) contracts resulting from the Amazonas Distribuidora de-verticalization process, thermal plant availability contracts, or Assured Capacity Quotas, whether in terms of resources, requirements (sales), or average prices. | |||||||
| 2. Own Resources include the decotization plants (new IPPs) and the New Grants—Sobradinho, Itumbiara, Tucuruí, Curuá-Una, and Mascarenhas de Moraes. For hydroelectric projects, an estimated GFIS2 was considered, that is, the Assured Capacity adjusted for Internal Loss Factors, Basic Network Loss Factors, and Availability Factors, as well as adjustments for portfolio-specific characteristics. | |||||||
| 3. The revised Assured Capacity values, as outlined in Ordinance No. 709/GM/MME, of November 30, 2022, have been taken into account. | |||||||
| 4. With the gradual phasing out of quota-based generation legacy contracts (decotization), plants currently operating under the quota regime are gradually granted new concessions under the IPP regime over a five-year period beginning in 2023. The Assured Capacity values were established in Ordinance GM/MME No. 544/21. | |||||||
| 5. Considering the new concession grants from 2023 onward for the Sobradinho, Itumbiara, Tucuruí, Curuá-Una, and Mascarenhas de Moraes plants, whose Assured Capacity values were established in Ordinance GM/MME No. 544/21. | |||||||
| 6. The balances include all energy purchased for resale: (a) short-term purchases (contracts with a duration of less than 12 months) and (b) structural purchases (contracts with a duration of at least 12 months). Additionally, the balances include intercompany transactions, impacting both energy purchase and sales lines in the ACL, in the following amounts: approximately 900 aMW in 2025 and 550 aMW in 2026 and 500 aMW in 2027. | |||||||
| 7. Average prices consider taxes in effect as of the date of this disclosure (February 26, 2026). | |||||||
| 8. The figures represent an estimate of uncontracted energy. The estimated values for 2025, 2026 and 2027 is 81.8%. Worth noting that the average historical GSF from 2019 to 2024 was 82.7%. Source: CCEE, obtained from the CCEE website at the following link: https://www.ccee.org.br/dados-e-analises/dados-geracao (in Portuguese only, select the MRE option in the panel). It is important to note that this is only an estimate, based on past events. | |||||||
| Physical Guarantee Quotas of Hydroelectric Plants (MWavg) | 2025 | 2026 | 2027 | ||||
| Quotas for Physical Guarantees (9) (10) | 2,626 | 1,313 | 0 | ||||
| 9. This excludes the Assured Capacity of Jaguari HPP (12.7 aMW), whose concession remains under AXIA Energia's provisional management. | |||||||
| 10. Decotization occurs gradually over a five-year period beginning in 2023. The Assured Capacity values applied from 2023 onward are those established in Ordinance GM/MME No. 544/21. | |||||||
| Energy Purchased for Resale | |||||||||
| AXIA Energia Company | Buyer | 1Q25 | 2Q25 | 3Q25 | 4Q25 | ||||
| BRL Million | MWh | BRL Million | MWh | BRL Million | MWh | BRL Million | MWh | ||
| AXIA Energia Norte (1) | AXIA Energia System | 0.42 | 4,464 | 0.00 | 0 | 0.00 | 0 | 0 | 0 |
| Others | 308.09 | 701,655 | 225.70 | 677,533 | 85.62 | 315,435 | 86 | 315,435 | |
| AXIA Energia Nordeste | AXIA Energia System | 0.18 | 1,860 | 0.64 | 2,578 | 12.78 | 44,160 | 16 | 57,840 |
| Others | 59.85 | 203,724 | 60.51 | 205,987 | 82.26 | 279,523 | 82 | 278,361 | |
| AXIA Energia Holding (2) | AXIA Energia System | 322.90 | 3,360,102 | 147.41 | 922,518 | 256.53 | 1,443,879 | 162 | 977,888 |
| Others | 590.21 | 2,487,918 | 981.35 | 4,193,349 | 1,138.78 | 4,646,580 | 1,069 | 4,266,790 | |
| AXIA Energia Sul (3) | AXIA Energia System | 44.89 | 356,739 | 46.69 | 329,464 | 48.50 | 251,203 | 43 | 232,603 |
| Others | 88.74 | 321,067 | 100.98 | 362,071 | 164.14 | 535,576 | 185 | 621,334 | |
| Note: Gross values. The accounting publishes net amounts of recoverable PIS/COFINS. | |||||||||
| Note: It includes only purchase contracts, not considering the negative values of the CCEE accounting. | |||||||||
| (1) Includes the SPE consolidated by Eletronorte: HPP Teles Pires (from 4Q23). | |||||||||
| (2) Includes SPEs consolidated by Furnas: HPP Santo Antônio (from 3Q22), HPPs Baguari and Retiro Baixo (from 4Q23) | |||||||||
| (3) Includes SPEs previously consolidated by CGT Eletrosul: Ibirapuitã (from 3Q25) | |||||||||
| Average fee – BRL/MWh | |||||
| Projects not renewed under Law No. 12.783/13 | |||||
| AXIA Energia Company | 1Q25 | 2Q25 | 3Q25 | 4Q25 | 2025 |
| AXIA Energia Norte | 294.18 | 228.26 | 171.88 | 179.07 | 222.38 |
| AXIA Energia Nordeste (1) | 103.63 | 144.49 | 141.30 | 165.26 | 132.31 |
| AXIA Energia Holding (1) | 173.33 | 178.93 | 195.16 | 194.91 | 185.22 |
| AXIA Energia Sul | 193.26 | 203.06 | 203.88 | 203.45 | 200.78 |
| (1) Includes projects affected by Law 13,182. | |||||
| - Selling prices calculated from the total revenue divided by the energy sold. | |||||
| - Purchase prices calculated from the total expenditure divided by the energy purchased. | |||||
| - Does not include projects not renewed by Law 12,783/13. | |||||
| - Includes SPEs consolidated by Furnas: HPP Santo Antônio (from 3Q22), HPPs Baguari and Retiro Baixo (from 4Q23) and Brasil Ventos (from 3Q25). Includes the SPE consolidated by Eletronorte: HPP Teles Pires (from 4Q23). Includes the SPE consolidated by CGT Eletrosul: Ibirapuitã (from 3Q25). | |||||
| Projects renewed under the terms of Law No. 12,783 – O&M Regime | |||||
| AXIA Energia Company | 1Q25 | 2Q25 | 3Q25 | 4Q25 | 2025 |
| AXIA Energia Norte | 80.76 | 76.95 | 63.02 | 65.74 | 71.55 |
| AXIA Energia Nordeste | 93.44 | 90.59 | 82.17 | 82.03 | 87.01 |
| AXIA Energia Holding | 85.77 | 83.40 | 79.07 | 92.71 | 85.50 |
| AXIA Energia Sul | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Note: Estimated rates considering the ratio between the Total Revenue in the period and the Physical Guarantee in the period (MWh). | |||||
| AXIA Energia Company Investments 2025 | |||||
| *Source: Controllership Department (FRPCA) | |||||
| VII.1 Corporate Investment and Partnerships | |||||
| Generation | 1Q25 | 2Q25 | 3Q25 | 4Q25 | Total Realized |
| AXIA Energia | 22,716,734 | 64,960,203 | 93,832,927 | 148,237,167 | 329,747,031 |
| Eletronorte | 29,758,677 | 46,323,058 | 57,803,687 | 195,243,175 | 329,128,597 |
| Chesf | 80,617,144 | 200,298,206 | 110,788,324 | 242,603,455 | 634,307,129 |
| CGT Eletrosul | 33,426,852 | 45,911,496 | 26,930,576 | 24,688,739 | 130,957,664 |
| Total | 166,519,408 | 357,492,963 | 289,355,515 | 610,772,536 | 1,424,140,421 |
| Generation - Expansion | 1Q25 | 2Q25 | 3Q25 | 4Q25 | Total Realized |
| AXIA Energia | 82,225 | 2,284,852 | 4,724,724 | 10,013,077 | 17,104,879 |
| Eletronorte | 103,584 | 1,289,888 | 119,582 | 1,002 | 1,514,057 |
| Chesf | 3,329,909 | 1,408,105 | 787,555 | 32,417,897 | 37,943,466 |
| CGT Eletrosul | 33,182,355 | 40,412,921 | 20,928,065 | 14,074,756 | 108,598,098 |
| Total | 36,698,073 | 45,395,767 | 26,559,926 | 56,506,733 | 165,160,498 |
| Generation - Maintenance / Modernization | 1Q25 | 2Q25 | 3Q25 | 4Q25 | Total Realized |
| AXIA Energia | 22,634,508 | 62,675,351 | 89,108,203 | 138,224,090 | 312,642,152 |
| Eletronorte | 29,655,093 | 45,033,170 | 57,684,105 | 195,242,172 | 327,614,541 |
| Chesf | 77,287,236 | 198,890,101 | 110,000,769 | 210,185,558 | 596,363,664 |
| CGT Eletrosul | 244,498 | 5,498,575 | 6,002,511 | 10,613,983 | 22,359,566 |
| Total | 129,821,335 | 312,097,196 | 262,795,589 | 554,265,803 | 1,258,979,923 |
| Generation - Partnerships | 1Q25 | 2Q25 | 3Q25 | 4Q25 | Total Realized |
| AXIA Energia | 0 | 0 | 0 | 0 | 0 |
| Eletronorte | 0 | 0 | 0 | 0 | 0 |
| Chesf | 0 | 0 | 0 | 0 | 0 |
| CGT Eletrosul | 0 | 0 | 0 | 0 | 0 |
| Total | 0 | 0 | 0 | 0 | 0 |
| Generation - Partnerships, Acquisition | 1Q25 | 2Q25 | 3Q25 | 4Q25 | Total Realized |
| AXIA Energia | 0 | 0 | 0 | 0 | 0 |
| Eletronorte | 0 | 0 | 0 | 0 | 0 |
| Chesf | 0 | 0 | 0 | 0 | 0 |
| CGT Eletrosul | 0 | 0 | 0 | 0 | 0 |
| Total | 0 | 0 | 0 | 0 | 0 |
| Generation - Partnerships, Contributions | 1Q25 | 2Q25 | 3Q25 | 4Q25 | Total Realized |
| AXIA Energia | 0 | 0 | 0 | 0 | 0 |
| Eletronorte | 0 | 0 | 0 | 0 | 0 |
| Chesf | 0 | 0 | 0 | 0 | 0 |
| CGT Eletrosul | 0 | 0 | 0 | 0 | 0 |
| Total | 0 | 0 | 0 | 0 | 0 |
| Transmission | 1Q25 | 2Q25 | 3Q25 | 4Q25 | Total Realized |
| AXIA Energia | 216,755,828 | 827,827,268 | 690,925,957 | 1,106,184,174 | 2,841,693,227 |
| Eletronorte | 155,757,401 | 200,992,051 | 313,467,405 | 657,363,340 | 1,327,580,198 |
| Chesf | 228,545,636 | 283,516,827 | 345,295,222 | 509,425,800 | 1,366,783,485 |
| CGT Eletrosul | 54,430,064 | 111,716,290 | 134,936,350 | 250,814,937 | 551,897,641 |
| Total | 655,488,930 | 1,424,052,436 | 1,484,624,934 | 2,523,788,251 | 6,087,954,550 |
| Transmission - Expansion | 1Q25 | 2Q25 | 3Q25 | 4Q25 | Total Realized |
| AXIA Energia | 6,990,645 | 29,092,480 | 32,262,662 | 160,342,947 | 228,688,734 |
| Eletronorte | 46,852,851 | 56,008,229 | 102,332,798 | 255,959,870 | 461,153,747 |
| Chesf | 260,371 | 53,365 | 19,690 | 5,960,727 | 6,294,152 |
| CGT Eletrosul | 0 | 0 | 0 | 0 | 0 |
| Total | 54,103,866 | 85,154,074 | 134,615,149 | 422,263,544 | 696,136,634 |
| Transmission - Reinforcements and Improvements | 1Q25 | 2Q25 | 3Q25 | 4Q25 | Total Realized |
| AXIA Energia | 209,407,101 | 573,190,147 | 375,606,827 | 860,979,268 | 2,019,183,343 |
| Eletronorte | 106,775,339 | 144,512,958 | 210,369,978 | 391,504,983 | 853,163,259 |
| Chesf | 228,285,266 | 283,463,462 | 345,275,532 | 503,465,073 | 1,360,489,333 |
| CGT Eletrosul | 51,287,291 | 107,265,370 | 129,279,904 | 236,543,739 | 524,376,305 |
| Total | 595,754,997 | 1,108,431,937 | 1,060,532,242 | 1,992,493,064 | 4,757,212,239 |
| Transmissão - Reinforcements and Improvements - Large Scale | 1Q25 | 2Q25 | 3Q25 | 4Q25 | Total Realized |
| AXIA Energia | 157,861,549 | 421,511,043 | 267,213,539 | 674,366,042 | 1,520,952,173 |
| Eletronorte | 60,582,139 | 87,444,994 | 130,611,631 | 237,079,532 | 515,718,297 |
| Chesf | 123,251,257 | 183,351,201 | 182,755,068 | 262,303,357 | 751,660,883 |
| CGT Eletrosul | 35,871,869 | 70,417,743 | 83,666,210 | 147,903,059 | 337,858,880 |
| Total | 377,566,814 | 762,724,982 | 664,246,448 | 1,321,651,990 | 3,126,190,234 |
| Transmissão - Reinforcements and Improvements - Small Scale | 1Q25 | 2Q25 | 3Q25 | 4Q25 | Total Realized |
| AXIA Energia | 51,545,552 | 151,679,103 | 108,393,288 | 186,613,226 | 498,231,170 |
| Eletronorte | 46,193,200 | 57,067,964 | 79,758,347 | 154,425,451 | 337,444,962 |
| Chesf | 105,034,008 | 100,112,261 | 162,520,464 | 241,161,716 | 608,828,450 |
| CGT Eletrosul | 15,415,423 | 36,847,626 | 45,613,694 | 88,640,681 | 186,517,424 |
| Total | 218,188,183 | 345,706,955 | 396,285,793 | 670,841,073 | 1,631,022,005 |
| Transmission - Maintenance | 1Q25 | 2Q25 | 3Q25 | 4Q25 | Total Realized |
| AXIA Energia | 0 | 0 | 0 | 0 | 0 |
| Eletronorte | 0 | 0 | 0 | 0 | 0 |
| Chesf | 0 | 0 | 0 | 0 | 0 |
| CGT Eletrosul | 0 | 0 | 0 | 0 | 0 |
| Total | 0 | 0 | 0 | 0 | 0 |
| Transmission - Other | 1Q25 | 2Q25 | 3Q25 | 4Q25 | Total Realized |
| AXIA Energia | 358,081 | 394,642 | 1,273,822 | 1,615,059 | 3,641,604 |
| Eletronorte | 2,129,212 | 470,864 | 764,629 | 9,898,486 | 13,263,191 |
| Chesf | 0 | 0 | 0 | 0 | 0 |
| CGT Eletrosul | 3,142,773 | 4,450,920 | 5,656,445 | 14,271,197 | 27,521,336 |
| Total | 5,630,066 | 5,316,426 | 7,694,896 | 25,784,743 | 44,426,131 |
| Transmission - Partnerships | 1Q25 | 2Q25 | 3Q25 | 4Q25 | Total Realized |
| AXIA Energia | 0 | 225,150,000 | 281,782,646 | 83,246,900 | 590,179,546 |
| Eletronorte | 0 | 0 | 0 | 0 | 0 |
| Chesf | 0 | 0 | 0 | 0 | 0 |
| CGT Eletrosul | 0 | 0 | 0 | 0 | 0 |
| Total | 0 | 225,150,000 | 281,782,646 | 83,246,900 | 590,179,546 |
| Transmission - Partnerships, Acquisitions | 1Q25 | 2Q25 | 3Q25 | 4Q25 | Total Realized |
| AXIA Energia | 0 | 0 | 0 | 0 | 0 |
| Eletronorte | 0 | 0 | 0 | 0 | 0 |
| Chesf | 0 | 0 | 0 | 0 | 0 |
| CGT Eletrosul | 0 | 0 | 0 | 0 | 0 |
| Total | 0 | 0 | 0 | 0 | 0 |
| Transmission - Partnerships, Contributions | 1Q25 | 2Q25 | 3Q25 | 4Q25 | Total Realized |
| AXIA Energia | 0 | 225,150,000 | 281,782,646 | 83,246,900 | 590,179,546 |
| Eletronorte | 0 | 0 | 0 | 0 | 0 |
| Chesf | 0 | 0 | 0 | 0 | 0 |
| CGT Eletrosul | 0 | 0 | 0 | 0 | 0 |
| Total | 0 | 225,150,000 | 281,782,646 | 83,246,900 | 590,179,546 |
| Environmental | 1Q25 | 2Q25 | 3Q25 | 4Q25 | Total Realized |
| AXIA Energia | 22,835,366 | 34,787,987 | 30,794,405 | 75,994,185 | 164,411,943 |
| Eletronorte | 15,297,249 | 19,037,124 | 23,200,925 | 32,958,466 | 90,493,765 |
| Chesf | 6,264,694 | 9,341,215 | 11,560,518 | 12,228,658 | 39,395,085 |
| CGT Eletrosul | 2,518,035 | 4,035,593 | 3,918,722 | 5,838,504 | 16,310,854 |
| Total | 46,915,344 | 67,201,918 | 69,474,571 | 127,019,814 | 310,611,647 |
| Environmental - Generation | 1Q25 | 2Q25 | 3Q25 | 4Q25 | Total Realized |
| AXIA Energia | 18,764,741 | 30,170,133 | 21,304,902 | 64,469,584 | 134,709,360 |
| Eletronorte | 12,179,867 | 16,946,521 | 18,323,313 | 24,838,566 | 72,288,267 |
| Chesf | 3,904,329 | 5,769,530 | 8,400,410 | 7,763,971 | 25,838,240 |
| CGT Eletrosul | 1,174,433 | 1,109,845 | 508,068 | 1,035,221 | 3,827,567 |
| Total | 36,023,370 | 53,996,029 | 48,536,692 | 98,107,342 | 236,663,433 |
| Environmental - Transmission | 1Q25 | 2Q25 | 3Q25 | 4Q25 | Total Realized |
| AXIA Energia | 4,070,624 | 4,617,854 | 8,047,990 | 11,524,601 | 28,261,070 |
| Eletronorte | 3,117,382 | 2,090,603 | 4,877,612 | 8,119,900 | 18,205,498 |
| Chesf | 2,360,365 | 3,571,685 | 3,160,108 | 4,464,687 | 13,556,846 |
| CGT Eletrosul | 1,343,602 | 2,925,747 | 3,410,655 | 4,803,283 | 12,483,287 |
| Total | 10,891,974 | 13,205,889 | 19,496,365 | 28,912,472 | 72,506,700 |
| Environmental - ESG | 1Q25 | 2Q25 | 3Q25 | 4Q25 | Total Realized |
| AXIA Energia | 0 | 0 | 1,441,514 | 0 | 1,441,514 |
| Eletronorte | 0 | 0 | 0 | 0 | 0 |
| Chesf | 0 | 0 | 0 | 0 | 0 |
| CGT Eletrosul | 0 | 0 | 0 | 0 | 0 |
| Total | 0 | 0 | 1,441,514 | 0 | 1,441,514 |
| Infrastructure | 1Q25 | 2Q25 | 3Q25 | 4Q25 | Total Realized |
| AXIA Energia | 32,130,654 | 82,225,051 | 116,887,536 | 231,027,322 | 462,270,563 |
| Eletronorte | 2,565,278 | 7,975,661 | 17,923,272 | 52,195,318 | 80,659,529 |
| Chesf | 6,926,637 | 19,534,093 | 26,401,070 | 88,967,877 | 141,829,677 |
| CGT Eletrosul | 1,776,178 | 7,386,888 | 19,764,240 | 40,192,187 | 69,119,493 |
| Total | 43,398,748 | 117,121,693 | 180,976,119 | 412,382,703 | 753,879,262 |
| Infrastructure Real Estate | 1Q25 | 2Q25 | 3Q25 | 4Q25 | Total Realized |
| AXIA Energia | 11,980,212 | 28,258,314 | 24,738,993 | 21,816,466 | 86,793,985 |
| Eletronorte | 256,452 | 2,541,622 | 5,736,746 | 13,045,642 | 21,580,462 |
| Chesf | 2,146,874 | 10,272,080 | 8,854,744 | 25,382,275 | 46,655,974 |
| CGT Eletrosul | 1,151,425 | 5,942,690 | 8,501,312 | 9,627,878 | 25,223,305 |
| Total | 15,534,963 | 47,014,707 | 47,831,796 | 69,872,260 | 180,253,726 |
| Movable Assets Infrastructure | 1Q25 | 2Q25 | 3Q25 | 4Q25 | Total Realized |
| AXIA Energia | 5,088,506 | 13,304,928 | 20,776,344 | 35,246,306 | 74,416,084 |
| Eletronorte | 2,008,462 | 2,006,969 | 3,313,337 | 19,931,582 | 27,260,350 |
| Chesf | 1,642,652 | 1,606,898 | 8,441,136 | 31,882,295 | 43,572,981 |
| CGT Eletrosul | 624,753 | 1,006,873 | 9,683,233 | 17,210,558 | 28,525,417 |
| Total | 9,364,373 | 17,925,669 | 42,214,049 | 104,270,741 | 173,774,832 |
| Infrastructure - IT | 1Q25 | 2Q25 | 3Q25 | 4Q25 | Total Realized |
| AXIA Energia | 15,061,937 | 40,661,809 | 71,372,199 | 173,964,550 | 301,060,494 |
| Eletronorte | 300,364 | 3,427,070 | 8,873,189 | 19,218,094 | 31,818,717 |
| Chesf | 3,137,111 | 7,655,114 | 9,105,189 | 31,703,307 | 51,600,722 |
| CGT Eletrosul | 0 | 437,324 | 1,579,695 | 13,353,751 | 15,370,771 |
| Total | 18,499,412 | 52,181,317 | 90,930,273 | 238,239,703 | 399,850,704 |
| Company | |||||
| 1Q25 | 2Q25 | 3Q25 | 4Q25 | Total | |
| AXIA Energia | 294,438,581 | 1,009,800,509 | 932,440,826 | 1,561,442,848 | 3,798,122,764 |
| Eletronorte | 203,378,606 | 274,327,894 | 412,395,290 | 937,760,299 | 1,827,862,089 |
| Chesf | 322,354,112 | 512,690,340 | 494,045,134 | 853,225,790 | 2,182,315,376 |
| CGT Eletrosul | 92,151,130 | 169,050,267 | 185,549,888 | 321,534,367 | 768,285,651 |
| Total | 912,322,429 | 1,965,869,010 | 2,024,431,138 | 3,673,963,303 | 8,576,585,881 |
| Corporate Transmission 4Q25 | |||||||||||||||||||||||
| This tab contains the total RAP associated with active modules at the time of publication of ReH 3348/2024, in addition to the RAP associated with modules planned at that time and that have entered into commercial operation since then, throughout 3Q24 to 3Q25. | |||||||||||||||||||||||
| The RAP value present in the "List of Modules" tab and not present in this tab refers to modules expected to come into operation after 3Q25. | |||||||||||||||||||||||
| Projects renewed pursuant to Law 12.783/13 | |||||||||||||||||||||||
| Company | Contract | Readjustment index | No. of associated substations | Total Km | RAP PRT MME 579/12 (O&M) | RAP Financial Component - PRT MME 120/16 | RAP Economic Component - PRT MME 120/16 | RAP Reinforcements and Improvements | RAP
Total approved cycle 2025/2026 (Ref. Jun/25) |
RAP add-on - works that entered into commercial operation (Ref. Jun/25) | RAP
Total (Ref. Jun/25) |
Duration of the contract | Reduction Date of RAP 50% after 15 years | Next readjustment date | Approved
RAP has RGR? (Yes/No) |
RGR rate | Tax Regime | Tax Rates | |||||
| PIS | COFINS | ||||||||||||||||||||||
| (I) | (II) | (III) | (IV) | (V = I+II+III+IV) | (VI) | (VII = V + VI) | Start Date | End Date | |||||||||||||||
| AXIA Energia Holding | 062/2001 | IPCA | 69 | 19,847.4 | 1,502,811,270.79 | 2,680,022,270.54 | 1,374,405,654.53 | 826,404,900.82 | 6,383,644,096.68 | 72,045,526.11 | 6,455,689,622.79 | jan/13 | jan/43 | N/A | 1-Jul-26 | No | 0.00% | Non Cumulative | 1.65% | 7.60% | |||
| AXIA Energia Nordeste | 061/2001 | IPCA | 121 | 19,384.7 | 956,862,985.73 | 1,675,982,724.39 | 786,646,684.65 | 772,009,865.17 | 4,191,502,259.94 | 43,823,411.00 | 4,235,325,670.94 | jan/13 | jan/43 | N/A | No | 0.00% | Non Cumulative | 1.65% | 7.60% | ||||
| AXIA Energia Norte | 058/2001 | IPCA | 51 | 8,840.5 | 608,890,215.04 | 781,957,856.07 | 355,734,263.39 | 489,606,327.02 | 2,236,188,661.52 | 41,371,869.20 | 2,277,560,530.72 | jan/13 | jan/43 | N/A | No | 0.00% | Non Cumulative | 1.65% | 7.60% | ||||
| AXIA Energia Sul | 057/2001 | IPCA | 54 | 8,898.2 | 380,843,929.63 | 366,441,470.55 | 102,888,958.29 | 313,189,436.83 | 1,163,363,795.30 | 24,867,226.46 | 1,188,231,021.76 | jan/13 | jan/43 | N/A | No | 0.00% | Non Cumulative | 1.65% | 7.60% | ||||
| TOTAL | 56,970.81 | 3,449,408,401.19 | 5,504,404,321.55 | 2,619,675,560.86 | 2,401,210,529.84 | 13,974,698,813.44 | 182,108,032.77 | 14,156,806,846.21 | |||||||||||||||
| Notes | |||||||||||||||||||||||
| 1. The values of the RAP cycle 2025/2026 established through Approval Resolution 3,348/2024 are at prices of June/2025. | |||||||||||||||||||||||
| 2. PRT MME 579/12 - Defined the initial RAP, referred to in art. 13 of Provisional Measure No. 579, of 2012 (converted into Law 12,783/2013), of the facilities that are part of the electric power transmission concessions under art. 6 of said Provisional Measure, subject to the decision provided for in art. 12. | |||||||||||||||||||||||
| (I) The opening of the total amount of RAP PRT MM 579/12 (O&M) is presented in the "RAP of the 2024/2025 cycle" column of the "List of Modules" tab of the spreadsheet, when filtering "PRT 579/2012" in the "RAP Act" column. | |||||||||||||||||||||||
| 3. PRT MME 120/16 - determined that the amounts approved by ANEEL related to the assets provided for in art. 15, § 2 of Law 12,783/2013 become part of the Regulatory Remuneration Base (BRR) of the transmitters and that the cost of capital is added to the respective Permitted Annual Revenues (RAP). The payment of said RBSE indemnity considers two components: (ii) Financial component: refers to the capital cost of RBSE assets, which was not paid to the transmitters between 01.01.2013 and 06.30.2017, which will be paid until the 2027-2028 tariff cycle, according to the reprofiling defined by ANEEL in the 2018 Periodic Tariff Review; and (ii) Economic component: refers to the capital cost of assets classified as RBSE and not yet depreciated on the base date of the tariff review. This portion of revenue is due to the extended transmitters as long as such assets are not fully depreciated. | |||||||||||||||||||||||
| (II) The opening of the total amount of RAP Financial Component - PRT MM 120/16 is presented in the column "RAP of cycle 2024/2025" of the tab "List of Modules" of the spreadsheet, when filtering "PRT 120/2016" in the column "RAP Act" and "Financial Component calculated for the period from January/2013 to June/2017, with a payment term of 8 years, as stated in § 3 and § 4, of Art. 1, of PRT 120/2016. * Revised revenue in the 2020-2021 cycle. * Revenue revised 07-05-2024" in column "Revenue Description". | |||||||||||||||||||||||
| (III) The opening of the total value of RAP Economic Component - PRT MM 120/16 is presented in the column "RAP of cycle 2024/2025" of the tab "List of Modules" of the spreadsheet, when filtering "PRT 120/2016" in the column "RAP Act" and "Installment of RAP calculated according to PRT 120/2016 and included from the 2017-2018 cycle. * Revenue revised 07-05-2024" in column "Revenue Description". | |||||||||||||||||||||||
| 4. RAP Reinforcements and Improvements - Revenues currently received due to reinforcements and improvements that entered into commercial operation until the last annual adjustment of RAP in July 2024. | |||||||||||||||||||||||
| (IV) The opening of the total value of RAP Reinforcements and Improvements is presented in the "RAP of cycle 2024/2025" column of the "List of Modules" tab of the spreadsheet, when filtering "RBNI, RCDM and RMEL" in the "revenue type" in the "RAP Act" column. | |||||||||||||||||||||||
| 5. (V) Total RAP approved for the 2024/2025 cycle through ReH 3,348/2024 associated with renewed contracts associated with projects in commercial operation in the Annual Adjustment of RAP cycle 2024/2025. | |||||||||||||||||||||||
| 6. (VI) Additional RAP associated with the authorized reinforcement and improvement works that entered into commercial operation from the last adjustment until 1Q25. The list of these works is presented when filtering the "Quarter" column of the "List of Modules" tab of the spreadsheet. | |||||||||||||||||||||||
| 7. (VII) Total RAP associated with the renewed contracts considers the incorporation of large-scale authorized reinforcement and improvement works, with revenue previously defined by ANEEL, which entered into commercial operation until 1Q25. | |||||||||||||||||||||||
| Bidding Projects | Approved RAP (*) + Additional RAP (**) | ||||||||||||||||||||||
| Company | Contract | Readjustment index | No. of associated substations | Total Km | RAP Auction | RAP Reinforcements and Improvements | RAP
Total approved cycle 2024/2025 (Ref. Jun/24) |
RAP add-on - works that entered into commercial operation (Ref. Jun/24) | RAP
Total (Ref. Jun/24) |
Duration of the contract | Reduction
Date of RAP 50% after 15 years |
Next readjustment date | Approved
RAP has RGR? (Yes/No) |
RGR rate | Tax Regime | Tax Rates | Company | RAP Renewed | RAP Bidders | Regulatory RAP | |||
| (I) | (II) | (III = I + II) | (IV) | (V = III +IV) | Start Date | End Date | PIS | COFINS | AXIA Energia Nordeste | 4,235,325,671 | 653,608,229 | 4,888,933,900 | |||||||||||
| AXIA Energia Nordeste | 007/2005 | IGPM | 2 | 208.1 | 12,799,084.40 | 20,248,348.02 | 33,047,432.42 | 0 | 33,047,432.42 | 3/4/2005 | 3/4/2035 | dez/22 | 1-Jul-26 | Yes | 2.9971% | Non Cumulative | 1.65% | 7.60% | RAP homologada | 4,191,502,260 | 653,608,229 | 4,845,110,489 | |
| 008/2005 | IGPM | 2 | 119.8 | 7,172,904.05 | 0.00 | 7,172,904.05 | 0 | 7,172,904.05 | 3/4/2005 | 3/4/2035 | set/24 | Yes | 2.9971% | Non Cumulative | 1.65% | 7.60% | adicional de RAP | 43,823,411 | 0 | 43,823,411 | |||
| 010/2007 | IPCA | 2 | 94.5 | 13,452,667.99 | 10,114,281.31 | 23,566,949.30 | 0 | 23,566,949.30 | 6/14/2007 | 6/14/2037 | ago/27 | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | FURNAS | 6,455,689,623 | 394,422,109 | 6,850,111,731 | |||
| 012/2007 | IPCA | 4 | 316 | 15,475,721.39 | 0.00 | 15,475,721.39 | 0 | 15,475,721.39 | 6/14/2007 | 6/14/2037 | set/25 e abr/29 | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | RAP homologada | 6,383,644,097 | 394,422,109 | 6,778,066,205 | |||
| 005/2008 | IPCA | 3 | 110.2 | 6,948,131.95 | 377,356.12 | 7,325,488.07 | 0 | 7,325,488.07 | 3/17/2008 | 3/17/2038 | N/A | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | adicional de RAP | 72,045,526 | 0 | 72,045,526 | |||
| 014/2008 | IPCA | 2 | 145.01 | 7,127,139.77 | 5,382,939.90 | 12,510,079.67 | 0 | 12,510,079.67 | 10/16/2008 | 10/16/2038 | N/A | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | AXIA Energia Norte | 2,277,560,531 | 733,840,567 | 3,011,401,097 | |||
| 006/2009 | IPCA | 3 | 49 | 19,907,334.12 | 14,854,205.72 | 34,761,539.84 | 0 | 34,761,539.84 | 1/28/2009 | 1/28/2039 | N/A | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | RAP homologada | 2,236,188,662 | 733,840,567 | 2,970,029,228 | |||
| 017/2009 | IPCA | 5 | 95.84 | 36,660,971.41 | 12,656,974.10 | 49,317,945.51 | 0 | 49,317,945.51 | 8/3/2009 | 8/3/2039 | N/A | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | adicional de RAP | 41,371,869 | 0 | 41,371,869 | |||
| 018/2009 | IPCA | 2 | 144.8 | 11,250,262.15 | 0.00 | 11,250,262.15 | 0 | 11,250,262.15 | 8/3/2009 | 8/3/2039 | N/A | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | AXIA Energia Sul | 1,188,231,022 | 670,535,942 | 1,858,766,964 | |||
| 004/2010 | IPCA | 4 | 34.28 | 49,736,818.38 | 4,552,833.09 | 54,289,651.47 | 0 | 54,289,651.47 | 7/12/2010 | 7/12/2040 | N/A | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | RAP homologada | 1,163,363,795 | 670,535,942 | 1,833,899,737 | |||
| 007/2010 | IPCA | 1 | 0 | 16,944,633.98 | 0.00 | 16,944,633.98 | 0 | 16,944,633.98 | 7/12/2010 | 7/12/2040 | N/A | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | adicional de RAP | 24,867,226 | 0 | 24,867,226 | |||
| 013/2010 | IPCA | 1 | 0 | 12,544,851.90 | 4,122,450.26 | 16,667,302.16 | 0 | 16,667,302.16 | 10/6/2010 | 10/6/2040 | N/A | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | VSB | 0 | 53,223,108 | 53,223,108 | |||
| 014/2010 | IPCA | 1 | 0 | 2,281,990.19 | 7,360,032.27 | 9,642,022.46 | 0 | 9,642,022.46 | 10/6/2010 | 10/6/2040 | N/A | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | RAP homologada | 0 | 53,223,108 | 53,223,108 | |||
| 019/2010 | IPCA | 7 | 321.0025 | 24,356,559.08 | 9,267,695.56 | 33,624,254.64 | 0 | 33,624,254.64 | 11/23/2010 | 11/23/2040 | N/A | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | adicional de RAP | 0 | 0 | 0 | |||
| 020/2010 | IPCA | 2 | 115 | 9,904,790.14 | 4,823,648.69 | 14,728,438.83 | 0 | 14,728,438.83 | 11/23/2010 | 11/23/2040 | N/A | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | TMT | 0 | 57,541,863 | 57,541,863 | |||
| 021/2010 | IPCA | 2 | 91.3 | 11,156,132.29 | 842,405.82 | 11,998,538.11 | 0 | 11,998,538.11 | 11/23/2010 | 11/23/2040 | N/A | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | RAP homologada | 0 | 57,541,863 | 57,541,863 | |||
| 008/2011 | IPCA | 5 | 285.77 | 67,617,095.91 | 34,673,122.73 | 102,290,218.64 | 0 | 102,290,218.64 | 10/13/2011 | 10/13/2041 | N/A | Yes | 2.6000% | Non Cumulative | 1.65% | 7.60% | adicional de RAP | 0 | 0 | 0 | |||
| 009/2011 | IPCA | 2 | 64.1 | 8,594,950.71 | 4,681,591.11 | 13,276,541.82 | 0 | 13,276,541.82 | 10/13/2011 | 10/13/2041 | N/A | Yes | 2.6000% | Non Cumulative | 1.65% | 7.60% | Total | 14,156,806,846 | 2,563,171,817 | 16,719,978,664 | |||
| 010/2011 | IPCA | 3 | 65.4 | 16,612,443.34 | 4,606,097.15 | 21,218,540.49 | 0 | 21,218,540.49 | 10/13/2011 | 10/13/2041 | N/A | Yes | 2.6000% | Non Cumulative | 1.65% | 7.60% | RAP homologada | 13,974,698,813 | 2,563,171,817 | 16,537,870,631 | |||
| 017/2011 | IPCA | 2 | 45.6 | 14,714,807.53 | 5,913,515.62 | 20,628,323.15 | 0 | 20,628,323.15 | 12/9/2011 | 12/9/2041 | N/A | Yes | 2.6000% | Non Cumulative | 1.65% | 7.60% | adicional de RAP | 182,108,033 | 0 | 182,108,033 | |||
| 005/2012 | IPCA | 4 | 42 | 30,045,615.72 | 6,003,360.63 | 36,048,976.35 | 0 | 36,048,976.35 | 5/10/2012 | 5/10/2042 | N/A | Yes | 2.6000% | Non Cumulative | 1.65% | 7.60% | (*) Approved RAP associated with active modules of ReH 3348/2024. | ||||||
| 017/2012 | IPCA | 2 | 0 | 17,641,696.37 | 0.00 | 17,641,696.37 | 0 | 17,641,696.37 | 6/1/2012 | 6/1/2042 | N/A | Yes | 2.6000% | Non Cumulative | 1.65% | 7.60% | (**) RAP associated with planned modules that came into operation during 3Q24 to 1Q25 | ||||||
| 018/2012 | IPCA | 6 | 207.8 | 22,939,331.62 | 0.00 | 22,939,331.62 | 0 | 22,939,331.62 | 6/1/2012 | 6/1/2042 | N/A | Yes | 2.6000% | Non Cumulative | 1.65% | 7.60% | |||||||
| 019/2012 | IPCA | 3 | 60.3 | 38,666,107.90 | 28,575,328.85 | 67,241,436.75 | 0 | 67,241,436.75 | 6/1/2012 | 6/1/2042 | N/A | Yes | 2.6000% | Non Cumulative | 1.65% | 7.60% | |||||||
| AXIA Energia Holding | 034/2001 | IGPM | 2 | 664.6 | 257,863,713.90 | 12,131,251.84 | 269,994,965.74 | 0 | 269,994,965.74 | 5/9/2001 | 5/9/2031 | Mar-18 | 1-Jul-26 | Yes | 2.8154% | Cumulative | 0.65% | 3.00% | |||||
| 006/2005 | IGPM | 2 | 89.8 | 17,447,782.53 | 102,519.84 | 17,550,302.37 | 0 | 17,550,302.37 | 3/4/2005 | 3/4/2035 | Jun-25 | Yes | 2.9971% | Non Cumulative | 1.65% | 7.60% | |||||||
| 007/2006 | IPCA | 3 | 71.1 | 28,875,747.37 | 210,557.87 | 29,086,305.24 | 0 | 29,086,305.24 | 4/27/2006 | 4/27/2036 | jan/28 e jan/30 | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | |||||||
| 003/2009 | IPCA | 2 | 179.7 | 15,971,883.38 | 0.00 | 15,971,883.38 | 0 | 15,971,883.38 | 1/28/2009 | 1/28/2039 | N/A | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | Company | km Renewed | km Not Renewed (*) | km Total | |||
| 028/2009 | IPCA | 3 | 187.1 | 17,511,091.80 | 0.00 | 17,511,091.80 | 0 | 17,511,091.80 | 11/19/2009 | 11/19/2039 | N/A | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | AXIA Energia Nordeste | 19,384.7 | 2,806.6 | 22,191.3 | |||
| 006/2010 | IPCA | 2 | 95 | 12,795,579.37 | 0.00 | 12,795,579.37 | 0 | 12,795,579.37 | 7/12/2010 | 7/12/2040 | N/A | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | AXIA Energia | 19,847.4 | 1,821.7 | 21,669.1 | |||
| 014/2011 | IPCA | 2 | 51.4 | 6,339,991.61 | 0.00 | 6,339,991.61 | 0 | 6,339,991.61 | 12/9/2011 | 12/9/2041 | N/A | Yes | 2.6000% | Non Cumulative | 1.65% | 7.60% | AXIA Energia Norte | 8,840.5 | 2,147.7 | 10,988.3 | |||
| 016/2012 | IPCA | 1 | 0 | 14,259,623.78 | 10,912,365.26 | 25,171,989.04 | 0 | 25,171,989.04 | 5/10/2012 | 5/10/2042 | N/A | Yes | 2.6000% | Non Cumulative | 1.65% | 7.60% | AXIA Energia Sul | 8,898.2 | 3,283.9 | 12,182.1 | |||
| AXIA Energia Norte | 007/2008 | IPCA | 2 | 35.93 | 5,219,931.29 | 10,505,922.61 | 15,725,853.90 | 0 | 15,725,853.90 | 3/17/2008 | 3/17/2038 | N/A | 1-Jul-26 | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | Total | 56,970.8 | 10,059.9 | 67,030.7 | |
| 001/2009 | IPCA | 2 | 95 | 14,079,703.89 | 19,255,812.37 | 33,335,516.26 | 0 | 33,335,516.26 | 1/28/2009 | 1/28/2039 | N/A | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | (*) Includes TLs of contracts without approved RAP | ||||||
| 002/2009 | IPCA | 1 | 0 | 14,619,817.84 | 9,261,027.78 | 23,880,845.62 | 0 | 23,880,845.62 | 1/28/2009 | 1/28/2039 | N/A | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | |||||||
| 010/2009 | IPCA | 2 | 50.22 | 103,960,229.69 | 10,656,843.39 | 114,617,073.08 | 0 | 114,617,073.08 | 2/26/2009 | 2/26/2039 | N/A | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | |||||||
| 012/2009 | IPCA | 2 | 111 | 336,441,413.88 | 0.00 | 336,441,413.88 | 0 | 336,441,413.88 | 2/26/2009 | 2/26/2039 | N/A | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | |||||||
| 021/2009 | IPCA | 7 | 985.63 | 98,526,920.99 | 6,700,190.22 | 105,227,111.21 | 0 | 105,227,111.21 | 11/19/2009 | 11/19/2039 | N/A | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | |||||||
| 022/2009 | IPCA | 3 | 546.9 | 56,254,959.69 | 1,912,108.38 | 58,167,068.07 | 0 | 58,167,068.07 | 11/19/2009 | 11/19/2039 | N/A | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | |||||||
| 009/2010 | IPCA | 2 | 59.08 | 8,387,841.34 | 0.00 | 8,387,841.34 | 0 | 8,387,841.34 | 7/12/2010 | 7/12/2040 | N/A | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | |||||||
| 004/2011 | IPCA | 1 | 0 | 4,421,502.89 | 5,570,007.61 | 9,991,510.50 | 0 | 9,991,510.50 | 6/28/2011 | 6/28/2041 | N/A | Yes | 2.6000% | Non Cumulative | 1.65% | 7.60% | |||||||
| 012/2011 | IPCA | 2 | 0 | 9,606,019.44 | 0.00 | 9,606,019.44 | 0 | 9,606,019.44 | 12/9/2011 | 12/9/2041 | N/A | Yes | 2.6000% | Non Cumulative | 1.65% | 7.60% | |||||||
| 013/2011 | IPCA | 1 | 0 | 3,071,555.34 | 0.00 | 3,071,555.34 | 0 | 3,071,555.34 | 12/9/2011 | 12/9/2041 | N/A | Yes | 2.6000% | Non Cumulative | 1.65% | 7.60% | |||||||
| 014/2012 | IPCA | 2 | 29.53 | 15,388,757.95 | 0.00 | 15,388,757.95 | 0 | 15,388,757.95 | 5/7/2012 | 5/7/2042 | N/A | Yes | 2.6000% | Non Cumulative | 1.65% | 7.60% | |||||||
| AXIA Energia Sul | 004/2004 | IGPM | 3 | 371.9 | 89,199,427.33 | 13,730.04 | 89,213,157.37 | 0 | 89,213,157.37 | 2/18/2004 | 2/18/2034 | Nov-20 | 1-Jul-26 | Yes | 2.9971% | Non Cumulative | 1.65% | 7.60% | |||||
| 010/2005 | IGPM | 4 | 375.8 | 78,833,426.95 | 85,535,409.74 | 164,368,836.69 | 0 | 164,368,836.69 | 3/4/2005 | 3/4/2035 | abr/23 | Yes | 2.9971% | Non Cumulative | 1.65% | 7.60% | |||||||
| 005/2006 | IPCA | 2 | 257.4 | 31,681,298.39 | 10,460.45 | 31,691,758.84 | 0 | 31,691,758.84 | 4/27/2006 | 4/27/2036 | mai/24 | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | |||||||
| 004/2008 | IPCA | 2 | 238 | 9,491,992.17 | 12,245.13 | 9,504,237.30 | 0 | 9,504,237.30 | 3/17/2008 | 3/17/2038 | N/A | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | |||||||
| 005/2009 | IPCA | 1 | 0 | 7,547,718.29 | 634,427.01 | 8,182,145.30 | 0 | 8,182,145.30 | 1/28/2009 | 1/28/2039 | N/A | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | |||||||
| 011/2010 | IPCA | 4 | 0 | 19,633,457.94 | 12,097,358.26 | 31,730,816.20 | 0 | 31,730,816.20 | 10/6/2010 | 10/6/2040 | N/A | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | |||||||
| 012/2010 | IPCA | 3 | 36.6 | 5,293,559.27 | 596,157.74 | 5,889,717.01 | 0 | 5,889,717.01 | 10/6/2010 | 10/6/2040 | N/A | Yes | 2.7083% | Non Cumulative | 1.65% | 7.60% | |||||||
| 002/2011 | IPCA | 3 | 231.3 | 4,283,917.46 | 10,978,544.43 | 15,262,461.89 | 0 | 15,262,461.89 | 6/16/2011 | 6/16/2041 | N/A | Yes | 2.6000% | Non Cumulative | 1.65% | 7.60% | |||||||
| 004/2012 | IPCA | 6 | 783.1 | 102,060,606.14 | 777,536.86 | 102,838,143.00 | 0 | 102,838,143.00 | 5/10/2012 | 5/10/2042 | N/A | Yes | 2.6000% | Non Cumulative | 1.65% | 7.60% | |||||||
| 020/2012 | IPCA | 5 | 473.2 | 157,255,434.38 | 17,511,133.53 | 174,766,567.91 | 0 | 174,766,567.91 | 8/27/2012 | 10/8/2042 | N/A | Yes | 2.6000% | Non Cumulative | 1.65% | 7.60% | |||||||
| 007/2014 | IPCA | 6 | 274.6 | 31,606,858.53 | 562,665.91 | 32,169,524.44 | 0 | 32,169,524.44 | 1/29/2014 | 1/29/2044 | N/A | No | 0.0000% | Non Cumulative | 1.65% | 7.60% | |||||||
| 008/2014 | IPCA | 1 | 0 | 4,918,575.88 | 0.00 | 4,918,575.88 | 0 | 4,918,575.88 | 1/29/2014 | 1/29/2044 | N/A | No | 0.0000% | Non Cumulative | 1.65% | 7.60% | |||||||
| TMT
(SPE 100% AXIA ENERGIA) |
004/2013 | IPCA | 2 | 297 | 57,541,863.01 | 0.00 | 57,541,863.01 | 0 | 57,541,863.01 | 8/14/2013 | 8/14/2043 | N/A | 1-jul-26 | No | 0.0000% | Cumulative | 0.65% | 3.00% | |||||
| VSB (SPE 100% AXIA ENERGIA) |
014/2013 | IPCA | 1 | 163 | 53,223,108.15 | 0.00 | 53,223,108.15 | 0 | 53,223,108.15 | 10/9/2013 | 10/9/2043 | N/A | 1-jul-26 | No | 0.0000% | Cumulative | 0.65% | 3.00% | |||||
| VSB (SPE 100% AXIA ENERGIA) |
013/2022 | IPCA | 1 | 0 | 0.00 | 0.00 | 0.00 | 13,432,102.74 | 13,432,102.74 | 9/30/2022 | 9/30/2052 | N/A | 1-jul-26 | No | 0.0000% | Cumulative | 0.65% | 3.00% | |||||
| Total | 158 | 9,370 | 2,168,167,354 | 395,004,463 | 2,563,171,817 | 13,432,103 | 2,576,603,920 | ||||||||||||||||
| Notes | |||||||||||||||||||||||
| 1. The values of the RAP cycle 2024/2025 established through Approval Resolution 3,348/2024 are at prices of June/2024. | |||||||||||||||||||||||
| 2. RAP Auction - amounts associated with the projects subject to auction. | |||||||||||||||||||||||
| (I) The opening of the total value of the RAP Auction is presented in the "RAP of cycle 2024/2025" column of the "RAP Data ReH 3,348/2024" tab of the spreadsheet, by filtering "RBL, RICG and RPEC" in the "RAP Act" column and filtering "active status" in the "RAP Status" column. | |||||||||||||||||||||||
| 3. RAP Reinforcements and Improvements - Revenues currently received due to reinforcements and improvements that entered into commercial operation until the last annual adjustment of RAP in July 2024. | |||||||||||||||||||||||
| (II) The opening of the total value of RAP Reinforcements and Improvements is presented in the "RAP cycle 2024/2025" column of the "RAP Data ReH 3,348/2024" tab of the spreadsheet, when filtering the bidding concession contracts and filtering "RBNI, RCDM and RMEL" in the "revenue type" in the "RAP Act" column and the RAP status column as "Active". | |||||||||||||||||||||||
| 4. (III) Total RAP approved for the 2024/2025 cycle through ReH 3,348/2024 associated with the bidding contracts associated with the projects in commercial operation in the Annual Adjustment of RAP cycle 2024/2025. | |||||||||||||||||||||||
| 5. (IV) Additional RAP associated with the authorized reinforcement and improvement works that entered into commercial operation from the last adjustment until 3Q24. The list of these works is presented when filtering the "Quarter" column of the "RAP Data ReH 3,348/2024" tab of the spreadsheet. | |||||||||||||||||||||||
| 7. (V) Total RAP associated with the bidding contracts considers the incorporation of large-scale authorized reinforcement and improvement works, with revenue previously defined by ANEEL, which entered into commercial operation until 4Q24. | |||||||||||||||||||||||
| 8. The information associated with the 100% AXIA Energia SPE concession contracts whose projects are in commercial operation are considered. | |||||||||||||||||||||||
| Other contracts (**) | |||||||||||||||||||||||
| Company | Total Km | ||||||||||||||||||||||
| AXIA Energia Nordeste | 190.80 | ||||||||||||||||||||||
| AXIA Energia | 483.00 | ||||||||||||||||||||||
| AXIA Energia Norte | 234.45 | ||||||||||||||||||||||
| AXIA Energia Sul | 242.00 | ||||||||||||||||||||||
| Notes | |||||||||||||||||||||||
| (**) Transmission lines associated with the connection of power plants, free consumers, sectioning, etc., without a revenue contract approved by REH 3216/2023 | |||||||||||||||||||||||
| Growth in Transmission | ||||||||||||||||||||||||||||
| This tab contains projects that have not yet started commercial operation and projects that have started commercial operation over the last quarter (projects with 100% physical progress). | ||||||||||||||||||||||||||||
| Parts of these projects are listed in the "List of Modules" tab. | ||||||||||||||||||||||||||||
| The data presented here refers to the sample of projects included in ANEEL's Transmission Management System (SIGET). | ||||||||||||||||||||||||||||
| Projects enter this sampling when they become part of SIGET, and leave when they are canceled in SIGET or when they entered commercial operation until the beginning of the current quarter. | ||||||||||||||||||||||||||||
| All projects to reinforce and improve this tab are considered large. This tab contains neither small reinforcement nor small improvement. | ||||||||||||||||||||||||||||
| Investment (projects that have not yet entered into commercial operation) | Capex (BRL bn) | RAP (BRL bn) | ||||||||||||||||||||||||||
| Total | Present in Modules List of tab "RAP Data ReH 3348_2024" | Not present in Modules List of tab "RAP Data ReH 3348_2024" | ||||||||||||||||||||||||||
| Auction 01/2022 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||||||||||||||||
| Auction 01/2023 | 0.68 | 0.08 | 0.08 | 0.00 | ||||||||||||||||||||||||
| Auction 01/2024 | 5.56 | 0.64 | 0.64 | 0.00 | ||||||||||||||||||||||||
| Auction 04/2025 | 1.63 | 0.14 | 0.00 | 0.14 | ||||||||||||||||||||||||
| Reinforcement | 3.47 | 0.56 | 0.51 | 0.05 | ||||||||||||||||||||||||
| Improvement (ex HVDC) | 2.62 | 0.42 | 0.38 | 0.04 | ||||||||||||||||||||||||
| AXIA Energia Consolidado | 13.97 | 1.84 | 1.61 | 0.23 | ||||||||||||||||||||||||
| TNE * | 3.30 | 0.56 | 0.00 | 0.56 | ||||||||||||||||||||||||
| Total | 17.27 | 2.40 | 1.61 | 0.79 | ||||||||||||||||||||||||
| * Base date: 01/2024. CAPEX and RAP referring to the entire project and includes the result of arbitration process to adjust the RAP. | ||||||||||||||||||||||||||||
| Investment (projects that have not yet entered into commercial operation) | Capex (BRL bn) | RAP (BRL bn) | ||||||||||||||||||||||||||
| Total | Present in Modules List of tab "RAP Data ReH 3348_2024" | Not present in Modules List of tab "RAP Data ReH 3348_2024" | ||||||||||||||||||||||||||
| Reinforcement & Improvement (ex HVDC) | 6.09 | 0.98 | 0.89 | 0.09 | ||||||||||||||||||||||||
| Reinforcement | 3.47 | 0.56 | 0.51 | 0.05 | ||||||||||||||||||||||||
| renewed | 3.09 | 0.51 | 0.47 | 0.04 | ||||||||||||||||||||||||
| bidders | 0.39 | 0.05 | 0.04 | 0.02 | ||||||||||||||||||||||||
| Improvement (ex HVDC) | 2.62 | 0.42 | 0.38 | 0.04 | ||||||||||||||||||||||||
| renewed | 2.62 | 0.42 | 0.38 | 0.04 | ||||||||||||||||||||||||
| bidders | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||||||||||||||||||
| Physical Characteristics (1) (2) | Values | |||||||||||||||||||||||||||
| Lines Extension (km) | 2,306 | |||||||||||||||||||||||||||
| Transformation Cap. (MVA) | 13,139 | |||||||||||||||||||||||||||
| (1) Projects that have not yet entered into commercial operation. | ||||||||||||||||||||||||||||
| (2) Excludes Itaipu HVDC revitalization project. | ||||||||||||||||||||||||||||
| Data of authorized projects planned to enter into commercial operation | ||||||||||||||||||||||||||||
| Index | Investment Type | AXIA Energia Company | Consolidation | % of Interest | Project | Investment Base Date | Investment (BRL Million) | Physical progress of the project (%) | Line
Extension (km) |
Voltage (kV) |
Transformation Capacity (MVA) | Reactive Compensation (MVAR) | Location (State) | Is it or is it not on the module list? | Forecast of Start of Operation | Termination of the Concession | RAP (BRL Million) | RAP base date | Readjustment Index | Reinforcement / Improvement / Expansion | Realized Investment 1Q25 (BRL Million) | Investment Realized 2Q25 (BRL Million) |
Investment Realized 3Q25 (BRL Million) |
Investment Realized 4Q25 (BRL Million) |
Concession Agreement | CA Renewed or Bid? | Project (I) | Notes |
| 1 | Transmission Line | AXIA Nordeste | AXIA Nordeste | 100% | Sectioning of the TL 500 kV Luiz Gonzaga - Milagres C1 at SS Milagres II | dez-25 | 47.96 | 36 | 2 | 500 | 0 | 0 | CE, PE | Yes | 19/07/26 | 31/12/42 | 9.45 | jun-25 | IPCA | Reinforcement | 1.56 | 7.02 | 5.65 | 9.91 | 061/2001 | Renewed | T2019-090 | |
| 2 | Transmission Line | AXIA Nordeste | AXIA Nordeste | 100% | Seccionamento da LT 500 kV Sobradinho - Luiz Gonzaga C2 na SE Juazeiro III (Concluído) | dez-25 | 49.78 | 100 | 1 | 500 | 0 | 0 | BA, PE | Yes | 17/11/25 | 31/12/42 | - | jun-25 | IPCA | Reinforcement | 6.35 | 7.61 | 14.55 | 23.34 | 061/2001 | Renewed | T2019-074 | |
| 3 | Transmission Line | AXIA Nordeste | AXIA Nordeste | 100% | Secc. TL 230 Olindina/Catu at SS Alagoinhas II | dez-25 | 33.98 | 63 | 1 | 230 | 0 | 0 | BA | Yes | 30/06/26 | 31/12/42 | 5.42 | jun-25 | IPCA | Reinforcement | 1.37 | 1.11 | 4.66 | 4.50 | 061/2001 | Renewed | T2022-113 | |
| 4 | Transmission Line | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement - Sectioning of TL Banabuiú-Milagres C2 at SS Icó. | dez-25 | 25.34 | 19 | 3 | 230 | 0 | 0 | CE | Yes | 28/07/26 | 31/12/42 | 4.15 | jun-25 | IPCA | Reinforcement | 0.06 | 0.36 | 0.23 | 1.47 | 061/2001 | Renewed | T2023-128 | |
| 5 | Transmission Line | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement - Sectioning of TL P.Afonso III-Bom Nome C3 at SS Floresta II. | dez-25 | 25.85 | 9 | 2 | 230 | 0 | 0 | PE | Yes | 28/11/29 | 31/12/42 | 4.15 | jun-25 | IPCA | Reinforcement | 0.07 | 0.24 | 0.24 | 0.29 | 061/2001 | Renewed | T2023-129 | |
| 6 | Transmission Line | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement - Sectioning of TL P.Afonso III-Bom Nome C2 at SS Tacaratu. | dez-25 | 37.18 | 5 | 14 | 230 | 0 | 0 | PE | Yes | 18/11/29 | 31/12/42 | 6.04 | jun-25 | IPCA | Reinforcement | 0.02 | 0.15 | 0.10 | 0.35 | 061/2001 | Renewed | T2023-130 | |
| 7 | Transmission Line | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement - Sectioning of TL P.Afonso III-Floresta II C1 at SS Tacaratu. | dez-25 | 11.49 | 5 | 7 | 230 | 0 | 0 | PE | Yes | 27/11/29 | 31/12/42 | 1.85 | jun-25 | IPCA | Reinforcement | 0.03 | 0.09 | 0.14 | 0.20 | 061/2001 | Renewed | T2023-131 | |
| 8 | Transmission Line | AXIA Norte | AXIA Norte | 100% | Sectioning of TL 138kV Rondonópolis-Couto Magalhães at SS Petrovina | dez-25 | 27.62 | 92 | 1 | 138 | 0 | 0 | MT | Yes | 16/02/26 | 31/12/42 | 4.32 | jun-25 | IPCA | Reinforcement | 1.30 | 0.21 | 1.60 | 5.81 | 058/2001 | Renewed | T2021-072 | |
| 9 | Transmission Line | AXIA Sudeste | AXIA Sudeste | 100% | Secc. TL 345kV Venda das Pedras - Macaé C1 at SS Lagos | dez-25 | 70.33 | 31 | 2 | 345 | 0 | 0 | RJ | Yes | 01/05/26 | 31/12/42 | 11.08 | jun-25 | IPCA | Reinforcement | 0.38 | 6.91 | 11.13 | 14.63 | 062/2001 | Renewed | T2022-112 | |
| 10 | Transmission Line | Nova Era Janapu | AXIA Sudeste | 100% | TL 500 kV Janaúba 6 – Presidente Juscelino C1 | ago-23 | 681.33 | 69 | 303 | 500 | 0 | 470 | MG | Yes | 30/09/28 | 29/09/53 | 77.90 | jun-25 | IPCA | Expansion | NA | NA | NA | NA | 009/2023 | Bidder | T2023-182 | |
| 11 | Substation | AXIA Sul | AXIA Sul | 100% | Melhoria na SE Gravatai: substituição do reator monofásico, RE2, 525 kV, 3x50 Mvar, Fases A e C (Concluído) | dez-25 | 14.83 | 100 | 0 | 525 | 0 | 0 | RS | Yes | 24/11/25 | 31/12/42 | - | jun-25 | IPCA | Improvement | 0.57 | 2.34 | 1.32 | 1.39 | 057/2001 | Renewed | T2023-002 | |
| 12 | Substation | AXIA Sul | AXIA Sul | 100% | Improvement at SS Campos Novos: single-phase reactor replacement, RE1, 525 kV, 3x33,333 Mvar | dez-25 | 18.40 | 92 | 0 | 525 | 0 | 0 | SC | Yes | 15/03/26 | 31/12/42 | 2.74 | jun-25 | IPCA | Improvement | 0.03 | 1.07 | 2.65 | 4.95 | 057/2001 | Renewed | T2023-003 | |
| 13 | Substation | AXIA Sul | AXIA Sul | 100% | Improvement at SS Campos Novos: single-phase reactor replacement, 525 kV, 33.333 Mvar, Reserve Phase 1 | dez-25 | 6.13 | 92 | 0 | 525 | 0 | 0 | SC | Yes | 15/03/26 | 31/12/42 | 0.91 | jun-25 | IPCA | Improvement | 0.01 | 0.36 | 0.88 | 1.65 | 057/2001 | Renewed | T2023-004 | |
| 14 | Substation | AXIA Sul | AXIA Sul | 100% | Melhoria na SE Campos Novos: substituição do reator monofásico, RE2, 525 kV, 3x33,333 Mvar (Concluído) | dez-25 | 17.06 | 100 | 0 | 525 | 0 | 0 | SC | Yes | 18/12/25 | 31/12/42 | 2.74 | jun-25 | IPCA | Improvement | 0.03 | 1.07 | 2.65 | 4.95 | 057/2001 | Renewed | T2023-005 | |
| 15 | Substation | AXIA Sul | AXIA Sul | 100% | Improvement at SS Itá: single-phase reactor replacement, RE1, 525 kV, 3x50 Mvar | dez-25 | 19.41 | 83 | 0 | 525 | 0 | 0 | SC | Yes | 15/03/26 | 31/12/42 | 2.89 | jun-25 | IPCA | Improvement | 0.01 | 0.02 | 2.80 | 8.52 | 057/2001 | Renewed | T2023-006 | |
| 16 | Substation | AXIA Sul | AXIA Sul | 100% | Melhoria na SE Itá: substituição do reator monofásico, RTR1, 525 kV, 50 Mvar, Fase Reserva 1 (Concluído) | dez-25 | 4.84 | 100 | 0 | 525 | 0 | 0 | SC | Yes | 19/12/25 | 31/12/42 | 0.96 | jun-25 | IPCA | Improvement | 0.00 | 0.01 | 0.93 | 2.84 | 057/2001 | Renewed | T2023-007 | |
| 17 | Substation | AXIA Sul | AXIA Sul | 100% | Improvement at SS Gravataí 2: replacement of the capacitor bank, BC4, 230 kV, 100 Mvar | dez-25 | 3.89 | 36 | 0 | 230 | 0 | 0 | RS | Yes | 31/05/26 | 31/12/42 | 0.66 | jun-25 | IPCA | Improvement | 0.01 | 0.02 | 0.02 | 0.03 | 057/2001 | Renewed | T2023-008 | |
| 18 | Substation | AXIA Sul | AXIA Sul | 100% | Improvement at SS Gravataí 2: replacement of the capacitor bank, BC5, 230 kV, 100 Mvar | dez-25 | 3.89 | 36 | 0 | 230 | 0 | 0 | RS | Yes | 30/06/26 | 31/12/42 | 0.66 | jun-25 | IPCA | Improvement | 0.01 | 0.02 | 0.02 | 0.03 | 057/2001 | Renewed | T2023-009 | |
| 19 | Substation | AXIA Sul | AXIA Sul | 100% | Improvement at SS Palhoça: replacement of the capacitor bank, BC1, 230 kV, 50 Mvar | dez-25 | 3.42 | 21 | 0 | 230 | 0 | 0 | SC | Yes | 15/06/26 | 31/12/42 | 0.58 | jun-25 | IPCA | Improvement | 0.01 | 0.02 | 0.05 | 0.09 | 057/2001 | Renewed | T2023-010 | |
| 20 | Substation | AXIA Sul | AXIA Sul | 100% | Melhoria na SE Gravataí: substituição do autotransformador monofásico, TF2, 525/230 kV, 3x224 MVA (Concluído) | dez-25 | 63.82 | 100 | 0 | 525 | 0 | 0 | RS | Yes | 24/10/25 | 31/12/42 | - | jun-25 | IPCA | Improvement | 2.44 | 10.07 | 5.67 | 5.98 | 057/2001 | Renewed | T2023-011 | |
| 21 | Substation | AXIA Sul | AXIA Sul | 100% | Melhoria na SE Gravataí: Substituição do autotransformador monofásico TF3, 525/230 kV, 3x224 MVA (Concluído) | dez-25 | 63.82 | 100 | 0 | 525 | 0 | 0 | RS | Yes | 23/12/25 | 31/12/42 | 8.30 | jun-25 | IPCA | Improvement | 2.44 | 10.07 | 5.67 | 5.98 | 057/2001 | Renewed | T2023-012 | |
| 22 | Substation | AXIA Sul | AXIA Sul | 100% | Improvement at SS Passo Fundo: replacement of TF3 single-phase autotransformer, 230/138 kV, 3x28 MVA | dez-25 | 24.91 | 25 | 0 | 230 | 0 | 0 | RS | Yes | 11/09/26 | 31/12/42 | 3.75 | jun-25 | IPCA | Improvement | 0.02 | 0.16 | 0.12 | 5.97 | 057/2001 | Renewed | T2023-013 | |
| 23 | Substation | AXIA Sul | AXIA Sul | 100% | Improvement at SS Passo Fundo: replacement of the autotransformer, 230/138 kV, 28 MVA, Reserve Phase | dez-25 | 8.30 | 39 | 0 | 230 | 0 | 0 | RS | Yes | 11/09/26 | 31/12/42 | 1.25 | jun-25 | IPCA | Improvement | 0.01 | 0.05 | 0.04 | 1.99 | 057/2001 | Renewed | T2023-014 | |
| 24 | Substation | AXIA Sul | AXIA Sul | 100% | Improvement of SS Campo Grande: replacement of Capacitor Bank, BC1, 138 kV, 30 Mvar | dez-25 | 2.76 | 52 | 0 | 230 | 0 | 0 | MS | Yes | 31/05/26 | 31/12/42 | 0.46 | jun-25 | IPCA | Improvement | 0.00 | 0.00 | 0.03 | 0.06 | 057/2001 | Renewed | T2023-028 | |
| 25 | Substation | AXIA Sul | AXIA Sul | 100% | Improvement at SS Londrina: replacement of autotransformer bank, TF3, 525/230 kV, 3x224 MVA | dez-25 | 55.44 | 37 | 0 | 525 | 0 | 0 | PR | Yes | 15/03/26 | 31/12/42 | 8.30 | jun-25 | IPCA | Improvement | 0.10 | 0.34 | 10.01 | 15.55 | 057/2001 | Renewed | T2023-029 | |
| 26 | Substation | AXIA Sul | AXIA Sul | 100% | Improvement at SS Blumenau: replacement of Phase C of TF6, 525/230 kV, 224 MVA | dez-25 | 18.48 | 43 | 0 | 525 | 0 | 0 | SC | Yes | 15/03/26 | 31/12/42 | 2.77 | jun-25 | IPCA | Improvement | 0.12 | 0.13 | 1.17 | 9.97 | 057/2001 | Renewed | T2023-030 | |
| 27 | Substation | AXIA Sul | AXIA Sul | 100% | Melhoria na SE Curitiba: substituição da Fase A do RE1, 525 kV, 50 Mvar (Concluído) | dez-25 | 7.93 | 100 | 0 | 525 | 0 | 0 | PR | Yes | 16/12/25 | 31/12/42 | 0.96 | jun-25 | IPCA | Improvement | 0.00 | 0.09 | 1.21 | 2.33 | 057/2001 | Renewed | T2023-031 | |
| 28 | Substation | AXIA Sul | AXIA Sul | 100% | Improvement at SS Santo Ângelo: replacement of the bank of single-phase reactors, RE1, 525 kV, 3x50 Mvar | dez-25 | 19.41 | 57 | 0 | 525 | 0 | 0 | RS | Yes | 11/09/26 | 31/12/42 | 2.89 | jun-25 | IPCA | Improvement | 0.04 | 0.15 | 2.84 | 0.72 | 057/2001 | Renewed | T2023-032 | |
| 29 | Substation | AXIA Sul | AXIA Sul | 100% | Improvement at SS Dourados: replacement of three-phase autotransformer, TF1, 230/138 kV, 75 MVA | dez-25 | 14.27 | 48 | 0 | 230 | 0 | 0 | MS | Yes | 15/05/26 | 31/12/42 | 2.14 | jun-25 | IPCA | Improvement | 0.01 | 0.02 | 0.62 | 3.79 | 057/2001 | Renewed | T2023-033 | |
| 30 | Substation | AXIA Sul | AXIA Sul | 100% | Improvement at SS Dourados: replacement of TF3 three-phase autotransformer, 230/138 kV, 75 MVA | dez-25 | 14.27 | 39 | 0 | 230 | 0 | 0 | MS | Yes | 15/06/26 | 31/12/42 | 2.14 | jun-25 | IPCA | Improvement | 0.01 | 0.02 | 0.62 | 3.79 | 057/2001 | Renewed | T2023-034 | |
| 31 | Substation | AXIA Sul | AXIA Sul | 100% | Improvement at SS Dourados: replacement of the three-phase autotransformer, TF4, 230/138 kV, 75 MVA | dez-25 | 14.27 | 38 | 0 | 230 | 0 | 0 | MS | Yes | 15/07/26 | 31/12/42 | 2.14 | jun-25 | IPCA | Improvement | 0.01 | 0.02 | 0.62 | 3.79 | 057/2001 | Renewed | T2023-035 | |
| 32 | Substation | AXIA Sul | AXIA Sul | 100% | Reinforcement at SS Jorge Lacerda A: replacement TF5 230/138 kV - 79 MVA by TF of 230/138 kV – 120 MVA | dez-25 | 31.11 | 75 | 0 | 230 | 41 | 0 | SC | Yes | 14/05/26 | 31/12/42 | 5.00 | jun-25 | IPCA | Reinforcement | 0.05 | 0.11 | 3.20 | 6.48 | 057/2001 | Renewed | T2023-138 | |
| 33 | Substation | AXIA Sul | AXIA Sul | 100% | Reinforcement at SS Jorge Lacerda A: replacement of TF7 230/138 kV - 79 MVA, by TR of 120 MVA | dez-25 | 31.11 | 81 | 0 | 230 | 41 | 0 | SC | Yes | 31/03/26 | 31/12/42 | 5.00 | jun-25 | IPCA | Reinforcement | 0.05 | 0.11 | 3.20 | 6.48 | 057/2001 | Renewed | T2023-145 | |
| 34 | Substation | AXIA Sul | AXIA Sul | 100% | Reforço na SE Jorge Lacerda A: substituição do TF8 138/69 kV - 25 MVA existente, por TF de 60 MVA (Concluído) | dez-25 | 23.88 | 100 | 0 | 138 | 35 | 0 | SC | Yes | 19/12/25 | 31/12/42 | 3.20 | jun-25 | IPCA | Reinforcement | 0.03 | 0.07 | 2.05 | 4.15 | 057/2001 | Renewed | T2023-148 | |
| 35 | Substation | AXIA Sul | AXIA Sul | 100% | Reinforcement at SS Jorge Lacerda A: replacement of the existing TF9 - 138/69 kV - 50 MVA, by TF of 60 MVA | dez-25 | 20.11 | 65 | 0 | 138 | 10 | 0 | SC | Yes | 14/05/26 | 31/12/42 | 3.23 | jun-25 | IPCA | Reinforcement | 0.03 | 0.07 | 2.07 | 4.19 | 057/2001 | Renewed | T2023-149 | |
| 36 | Substation | AXIA Sul | AXIA Sul | 100% | Reforço na SE Anastácio: Instalação do 2º reator de barra de 27 Mvar em 230 kV (Concluído) | dez-25 | 16.07 | 100 | 0 | 230 | 0 | 27 | MS | Yes | 20/12/25 | 31/12/42 | 2.84 | jun-25 | IPCA | Reinforcement | 0.05 | 0.06 | 1.49 | 8.25 | 057/2001 | Renewed | T2023-201 | |
| 37 | Substation | AXIA Sul | AXIA Sul | 100% | Reforço na SE Dourados: Substituição do Reator de Barra 1 de 27 Mvar por 1x50Mvar, 230 kV (Concluído) | dez-25 | 10.88 | 100 | 0 | 230 | 0 | 23 | MS | Yes | 20/12/25 | 31/12/42 | 1.31 | jun-25 | IPCA | Reinforcement | 0.04 | 0.05 | 1.01 | 3.70 | 057/2001 | Renewed | T2023-202 | |
| 38 | Substation | AXIA Sul | AXIA Sul | 100% | Improvement at SS Caxias do Sul 5: BC1 Capacitor Bank Replacement, 13.8 kV, 3.6 Mvar | dez-25 | 1.92 | 11 | 0 | 14 | 0 | 0 | RS | Yes | 31/05/27 | 31/12/42 | 0.33 | jun-25 | IPCA | Improvement | 0.03 | 0.05 | 0.03 | 0.03 | 057/2001 | Renewed | T2024-012 | |
| 39 | Substation | AXIA Sul | AXIA Sul | 100% | Improvement at SS Caxias do Sul 5: BC2 Capacitor Bank Replacement, 13.8 kV, 3.6 Mvar | dez-25 | 1.92 | 11 | 0 | 14 | 0 | 0 | RS | Yes | 31/05/27 | 31/12/42 | 0.33 | jun-25 | IPCA | Improvement | 0.03 | 0.05 | 0.03 | 0.03 | 057/2001 | Renewed | T2024-013 | |
| 40 | Substation | AXIA Sul | AXIA Sul | 100% | Improvement at SS Caxias do Sul 5: BC3 Capacitor Bank Replacement, 13.8 kV, 3.6 Mvar | dez-25 | 1.92 | 11 | 0 | 14 | 0 | 0 | RS | Yes | 31/05/27 | 31/12/42 | 0.33 | jun-25 | IPCA | Improvement | 0.03 | 0.05 | 0.03 | 0.03 | 057/2001 | Renewed | T2024-014 | |
| 41 | Substation | AXIA Sul | AXIA Sul | 100% | Improvement at SS Caxias do Sul 5: BC4 Capacitor Bank Replacement, 13.8 kV, 3.6 Mvar | dez-25 | 1.92 | 11 | 0 | 14 | 0 | 0 | RS | Yes | 31/05/27 | 31/12/42 | 0.33 | jun-25 | IPCA | Improvement | 0.03 | 0.05 | 0.03 | 0.03 | 057/2001 | Renewed | T2024-015 | |
| 42 | Substation | AXIA Sul | AXIA Sul | 100% | SS GRAVATAÍ 3: Installation of the 2nd Transformer 230/69 kV, 3x 55 MVA, at SS Gravataí 3. | dez-25 | 40.35 | 16 | 0 | 230 | 165 | 0 | RS | Yes | 15/10/26 | 31/12/42 | 6.43 | jun-25 | IPCA | Reinforcement | 0.10 | 0.17 | 0.18 | 0.30 | 057/2001 | Renewed | T2024-005 | |
| 43 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | SE Milagres - Instalação do quarto transformador 230/69 kV, 100 MVA e conexões (Concluído) | dez-25 | 41.98 | 100 | 0 | 230 | 100 | 0 | CE | Yes | 20/12/24 | 31/12/42 | - | jun-25 | IPCA | Reinforcement | 1.71 | 0.68 | 1.68 | 1.18 | 061/2001 | Renewed | T2019-032 | |
| 44 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | SE Jacaracanga TR2 (Melhorias) (Concluído) | dez-25 | 14.92 | 100 | 0 | 230 | 0 | 0 | BA | Yes | 10/11/25 | 31/12/42 | 1.87 | jun-25 | IPCA | Improvement | 0.53 | 0.85 | 1.46 | 3.19 | 061/2001 | Renewed | T2020-012 | |
| 45 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | SE Angelim II (Concluído) | dez-25 | 14.24 | 100 | 0 | 500 | 0 | 150 | PE | Yes | 23/12/25 | 31/12/42 | 3.45 | jun-25 | IPCA | Reinforcement | 2.17 | 16.96 | 4.78 | 7.55 | 061/2001 | Renewed | T2021-026 | |
| 46 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | SS Olindina | dez-25 | 22.95 | 99 | 0 | 500 | 0 | 150 | BA | Yes | 25/01/26 | 31/12/42 | 3.45 | jun-25 | IPCA | Reinforcement | 0.62 | 15.96 | 4.39 | 4.88 | 061/2001 | Renewed | T2021-028 | |
| 47 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Melhoria na SE Camacari II - substituição de reator RT1, 500 kV, 100 Mvar (Concluído) | dez-25 | 20.66 | 100 | 0 | 500 | 0 | 0 | BA | Yes | 14/12/25 | 31/12/42 | - | jun-25 | IPCA | Improvement | 5.69 | 0.05 | 0.57 | 5.47 | 061/2001 | Renewed | T2022-080 | |
| 48 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Melhoria na SE Camacari II - substituição do reator reserva RTR1, 500 kV, 33,3 Mvar (Concluído) | dez-25 | 6.93 | 100 | 0 | 500 | 0 | 0 | BA | Yes | 21/12/25 | 31/12/42 | 0.84 | jun-25 | IPCA | Improvement | 2.94 | 0.03 | 0.12 | 2.75 | 061/2001 | Renewed | T2022-081 | |
| 49 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Melhoria na SE Recife II - substituição do reator RT2, 500 kV, 100 Mvar (Concluído) | dez-25 | 19.69 | 100 | 0 | 500 | 0 | 0 | PE | Yes | 29/11/25 | 31/12/42 | - | jun-25 | IPCA | Improvement | 7.50 | 0.05 | 0.89 | 6.11 | 061/2001 | Renewed | T2022-083 | |
| 50 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Melhoria na SE Recife II - substituição do reator reserva RTR1, 500 kV, 33,3 Mvar (Concluído) | dez-25 | 7.64 | 100 | 0 | 500 | 0 | 0 | PE | Yes | 30/12/25 | 31/12/42 | 0.84 | jun-25 | IPCA | Improvement | 2.79 | 0.02 | 0.12 | 2.03 | 061/2001 | Renewed | T2022-084 | |
| 51 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Melhoria na U.Sobradinho 500 kV - subsituição do reator shunt reserva RTR1, 500 kV, 33,3 Mvar (Concluído) | dez-25 | 8.17 | 100 | 0 | 500 | 0 | 0 | BA | Yes | 29/12/25 | 31/12/42 | 0.84 | jun-25 | IPCA | Improvement | 2.56 | 0.01 | 0.37 | 1.72 | 061/2001 | Renewed | T2022-086 | |
| 52 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | SE Bongi - Instalação do 5ª transformadore substituição de três transformadores (Concluído) | dez-25 | 153.72 | 100 | 0 | 230 | 500 | 0 | PE | Yes | 24/10/25 | 31/12/42 | 4.48 | jun-25 | IPCA | Reinforcement | 16.27 | 20.78 | 16.36 | 6.13 | 061/2001 | Renewed | T2022-032 | |
| 53 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | SS Teresina II - 2nd reactor bank 500 kV | dez-25 | 55.82 | 21 | 0 | 500 | 0 | 200 | PI | Yes | 07/08/26 | 31/12/42 | 8.57 | jun-25 | IPCA | Reinforcement | 0.29 | 1.28 | 11.57 | 16.07 | 061/2001 | Renewed | T2022-065 | |
| 54 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | SS São João do Piauí 3rd Trafo 500/230 3x100 MVA | dez-25 | 94.44 | 69 | 0 | 500 | 300 | 0 | PI | Yes | 31/03/26 | 31/12/42 | 14.58 | jun-25 | IPCA | Improvement | 0.60 | 29.19 | 22.72 | 11.77 | 061/2001 | Renewed | T2022-101 | |
| 55 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Improvement at SS Fortaleza: Replacement of transformer 04T2 of SS FTZ. | dez-25 | 15.53 | 99 | 0 | 230 | 0 | 0 | CE | Yes | 05/01/26 | 31/12/42 | 2.44 | jun-25 | IPCA | Improvement | 2.47 | 0.08 | 0.29 | 7.96 | 061/2001 | Renewed | T2023-051 | |
| 56 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Improvement at SS Fortaleza: Replacement of transformer 04T4 of SS FTZ. | dez-25 | 15.53 | 35 | 0 | 230 | 0 | 0 | CE | Yes | 30/08/27 | 31/12/42 | 2.44 | jun-25 | IPCA | Improvement | 0.05 | 0.08 | 0.06 | 0.16 | 061/2001 | Renewed | T2023-052 | |
| 57 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Melhoria na SE Maceió: Substituição do transformador 04T3 da SE MCO. (Concluído) | dez-25 | 13.85 | 100 | 0 | 230 | 0 | 0 | AL | Yes | 23/12/25 | 31/12/42 | 2.44 | jun-25 | IPCA | Improvement | 2.46 | 0.09 | 0.09 | 13.12 | 061/2001 | Renewed | T2023-054 | |
| 58 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Melhoria na SE Angelim II: Substituição de Reator monofásico, 50 MVAr, posição operacional 05ER (Concluído) | dez-25 | 6.83 | 100 | 0 | 500 | 0 | 0 | PE | Yes | 30/12/25 | 31/12/42 | 0.93 | jun-25 | IPCA | Improvement | 0.94 | 0.06 | 0.03 | 2.73 | 061/2001 | Renewed | T2023-055 | |
| 59 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Improvement at SS Angelim II: Replacement of 3 Single Phase Reactors, 3x50 MVAr, position 05E3 | dez-25 | 17.73 | 66 | 0 | 500 | 0 | 0 | PE | Yes | 10/04/26 | 31/12/42 | 2.78 | jun-25 | IPCA | Improvement | 2.81 | 0.03 | 0.02 | 4.86 | 061/2001 | Renewed | T2023-056 | |
| 60 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Improvement at SS Angelim II: Replacement of 3 Single Phase Reactors, 3x50 MVAr, position 05E2 | dez-25 | 17.73 | 73 | 0 | 500 | 0 | 0 | PE | Yes | 10/04/26 | 31/12/42 | 2.78 | jun-25 | IPCA | Improvement | 2.84 | 0.03 | 0.02 | 5.27 | 061/2001 | Renewed | T2023-057 | |
| 61 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Improvement at SS Olindin II: Replacement of a Single Phase Reactor, 50 MVAr, operational position 05ER | dez-25 | 5.91 | 81 | 0 | 500 | 0 | 0 | BA | Yes | 20/01/26 | 31/12/42 | 0.93 | jun-25 | IPCA | Improvement | 0.96 | 0.07 | 0.18 | 2.28 | 061/2001 | Renewed | T2023-058 | |
| 62 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Improvement at SS Olindin II: Replacement of 3 Single Phase Reactors, 3x50 MVAr, position 05E1 | dez-25 | 17.73 | 81 | 0 | 500 | 0 | 0 | BA | Yes | 10/04/26 | 31/12/42 | 2.78 | jun-25 | IPCA | Improvement | 2.88 | 0.09 | 0.60 | 4.95 | 061/2001 | Renewed | T2023-059 | |
| 63 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Reforço na SE Barreiras: instalação do TR3, 230/138 kV, de 100 MVA. (Concluído) | dez-25 | 25.37 | 100 | 0 | 230 | 100 | 0 | BA | Yes | 26/10/25 | 31/12/42 | 5.49 | jun-25 | IPCA | Reinforcement | 1.74 | 4.43 | 14.67 | 5.86 | 061/2001 | Renewed | T2023-080 | |
| 64 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement at SS Bom Nome: Installation of the 4th TF 230/138 kV - 100 MVA | dez-25 | 31.37 | 51 | 0 | 230 | 100 | 0 | PE | Yes | 01/02/26 | 31/12/42 | 5.06 | jun-25 | IPCA | Reinforcement | 4.13 | 4.48 | 6.39 | 15.38 | 061/2001 | Renewed | T2023-109 | |
| 65 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement at SS Bom Jesus da Lapa: replacement of TR3 230/69 kV | dez-25 | 15.30 | 11 | 0 | 230 | 61 | 0 | BA | Yes | 16/10/26 | 31/12/42 | 2.40 | jun-25 | IPCA | Reinforcement | 0.13 | 0.98 | 0.10 | 7.87 | 061/2001 | Renewed | T2023-110 | |
| 66 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Reforço na SE S. João do Piauí: substituição do TR3 230/69 kV 33 MVA por 100 MVA (Concluído) | dez-25 | 12.38 | 100 | 0 | 230 | 67 | 0 | PI | Yes | 22/12/25 | 31/12/42 | 2.19 | jun-25 | IPCA | Reinforcement | 0.09 | 1.18 | 0.09 | 8.53 | 061/2001 | Renewed | T2023-112 | |
| 67 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement at SS S. João do Piauí: replacement of TR4 230/69 kV 33 MVA with 100 MVA | dez-25 | 13.99 | 40 | 0 | 230 | 67 | 0 | PI | Yes | 15/07/26 | 31/12/42 | 2.19 | jun-25 | IPCA | Reinforcement | 0.02 | 1.10 | 7.88 | 1.86 | 061/2001 | Renewed | T2023-113 | |
| 68 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement at SS Bom Jesus da Lapa: Replacement of TR2 230/69 kV - 33 MVA to 100 MVA | dez-25 | 13.99 | 0 | 0 | 230 | 67 | 0 | BA | Yes | 03/07/26 | 31/12/42 | 2.19 | jun-25 | IPCA | Reinforcement | 0.09 | 0.16 | 2.31 | 6.72 | 061/2001 | Renewed | T2023-159 | |
| 69 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement at SS Açu II: Replacement of TR4 230/69 kV - 39 MVA to 100 MVA | dez-25 | 13.99 | 86 | 0 | 230 | 61 | 0 | RN | Yes | 11/01/26 | 31/12/42 | 2.19 | jun-25 | IPCA | Reinforcement | 0.08 | 0.23 | 3.72 | 8.62 | 061/2001 | Renewed | T2023-160 | |
| 70 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement at SS Irecê: Replacement of TR2 and TR3 230/69 kV - 33 MVA by two 100 MVA TRs | dez-25 | 52.23 | 0 | 0 | 230 | 134 | 0 | BA | Yes | 30/09/26 | 31/12/42 | 8.36 | jun-25 | IPCA | Reinforcement | 0.98 | 0.10 | 0.54 | 10.84 | 061/2001 | Renewed | T2023-161 | |
| 71 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement at SS Itabaiana: Replacement of 1st and 2nd TR 230/69 kV - 100 MVA to 150 MVA | dez-25 | 55.84 | 0 | 0 | 230 | 100 | 0 | SE | Yes | 05/01/27 | 31/12/42 | 9.01 | jun-25 | IPCA | Reinforcement | 0.99 | 0.10 | 0.15 | 0.24 | 061/2001 | Renewed | T2023-162 | |
| 72 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement at SS Olindina: Installation of the 3rd bank of 3 x 50 Mvar bar reactors at 500 kV | dez-25 | 46.41 | 0 | 0 | 500 | 0 | 150 | BA | Yes | 05/12/26 | 31/12/42 | 7.39 | jun-25 | IPCA | Reinforcement | 0.10 | 0.17 | 0.70 | 10.03 | 061/2001 | Renewed | T2023-181 | |
| 73 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | SS MOSSORÓ IV: Installation of the 2nd 230/69 kV Transformer | dez-25 | 27.77 | 6 | 0 | 230 | 230 | 0 | RN | Yes | 25/08/26 | 01/06/42 | 3.65 | jun-25 | IPCA | Reinforcement | 0.14 | 0.06 | 0.12 | 0.13 | 018/2012 | Bidder | T2024-006 | |
| 74 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement at SS Camaçari IV: Installation of the 1st Bar Reactor Bank at 500 kV | dez-25 | 42.26 | 2 | 0 | 500 | 0 | 150 | BA | Yes | 09/07/26 | 12/07/40 | 6.05 | jun-25 | IPCA | Reinforcement | 0.10 | 0.17 | 0.14 | 0.49 | 007/2010 | Bidder | T2024-011 | |
| 75 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Improvement at SS São João do Piauí: Replacement of Autotransformer Bank 500/230 kV, 3x100 MVA | dez-25 | 32.88 | 13 | 0 | 500 | 0 | 0 | PI | Yes | 21/03/27 | 31/12/42 | 5.21 | jun-25 | IPCA | Improvement | 0.06 | 0.09 | 0.11 | 0.04 | 061/2001 | Renewed | T2024-029 | |
| 76 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Improvement at SS Pirapama II: Replacement of Three-Phase Transformer TR1, 230/69/13.8 kV, 100 MVA | dez-25 | 13.78 | 0 | 0 | 230 | 0 | 0 | PE | Yes | 30/08/26 | 31/12/42 | 2.17 | jun-25 | IPCA | Improvement | 0.05 | 0.11 | 0.10 | 0.10 | 061/2001 | Renewed | T2024-030 | |
| 77 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Improvement at SS Campina Grande II: Replacement of Three-Phase Transformer TR3 230/69 kV, 100 MVA | dez-25 | 13.78 | 0 | 0 | 230 | 0 | 0 | PB | Yes | 21/02/27 | 31/12/42 | 2.18 | jun-25 | IPCA | Improvement | 0.07 | 0.05 | 0.03 | 0.07 | 061/2001 | Renewed | T2024-031 | |
| 78 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Improvement at SS Campina Grande II: Replacement of Three-Phase Transformer TR4 230/69 kV, 100 MVA | dez-25 | 13.78 | 0 | 0 | 230 | 0 | 0 | PB | Yes | 21/02/27 | 31/12/42 | 2.18 | jun-25 | IPCA | Improvement | 0.02 | 0.00 | 0.02 | 0.06 | 061/2001 | Renewed | T2024-032 | |
| 79 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement at SS Zebu: Installation of the 4th TF 230/69 | dez-25 | 27.89 | 71 | 0 | 230 | 100 | 0 | AL | Yes | 22/09/26 | 03/08/39 | 3.67 | jun-25 | IPCA | Reinforcement | 0.05 | 0.03 | 0.08 | 0.09 | 017/2009 | Bidder | T2024-034 | |
| 80 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement at SS Coremas: Installation of the 4th TR 230/69 kV | dez-25 | 28.35 | 0 | 0 | 230 | 100 | 0 | PB | Yes | 30/08/26 | 31/12/42 | 4.58 | jun-25 | IPCA | Reinforcement | 0.15 | 0.16 | 0.26 | 0.52 | 061/2001 | Renewed | T2024-103 | |
| 81 | Substation | AXIA Norte | AXIA Norte | 100% | Melhoria na SE P. Dutra - substituição do reator RT4, 500 kV, 3x50 MVAr (Concluído) | dez-25 | 12.80 | 100 | 0 | 500 | 0 | 0 | MA | Yes | 13/12/25 | 31/12/42 | - | jun-25 | IPCA | Improvement | 0.27 | 0.50 | 2.33 | 6.06 | 058/2001 | Renewed | T2022-034 | |
| 82 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at SS P. Dutra - RT6 reactor replacement, 500 kV, 3x33.33 MVAr | dez-25 | 16.91 | 92 | 0 | 500 | 0 | 0 | MA | Yes | 04/04/26 | 31/12/42 | 2.52 | jun-25 | IPCA | Improvement | 0.48 | 0.86 | 4.05 | 10.50 | 058/2001 | Renewed | T2022-036 | |
| 83 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at SS Imperatriz - replacement of RT6 reactor, 500 kV, 3x45.33 MVAr | dez-25 | 17.12 | 98 | 0 | 500 | 0 | 0 | MA | Yes | 31/01/26 | 31/12/42 | 2.53 | jun-25 | IPCA | Improvement | 8.62 | 2.27 | 7.67 | 15.22 | 058/2001 | Renewed | T2022-040 | |
| 84 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at the SS Imperatriz - replacement of the single-phase RTR6 reactor, 500 kV, 1x45.33 MVAr | dez-25 | 5.71 | 97 | 0 | 500 | 0 | 0 | MA | Yes | 31/01/26 | 31/12/42 | 0.84 | jun-25 | IPCA | Improvement | 2.87 | 0.75 | 2.55 | 5.06 | 058/2001 | Renewed | T2022-041 | |
| 85 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement SS P. Dutra - RT1 reactor replacement, 500 kV, 3x50 MVAR | dez-25 | 17.40 | 93 | 0 | 500 | 0 | 0 | MA | Yes | 04/04/26 | 31/12/42 | 2.57 | jun-25 | IPCA | Improvement | 0.25 | 2.22 | 6.63 | 20.78 | 058/2001 | Renewed | T2022-042 | |
| 86 | Substation | AXIA Norte | AXIA Norte | 100% | Melhoria na SE São Luis II - substituição do reator RT3, 500 kV, 3x45,33 MVAR (Concluído) | dez-25 | 16.84 | 100 | 0 | 500 | 0 | 0 | MA | Yes | 14/10/25 | 31/12/42 | - | jun-25 | IPCA | Improvement | 2.32 | 11.41 | 3.56 | 4.05 | 058/2001 | Renewed | T2022-043 | |
| 87 | Substation | AXIA Norte | AXIA Norte | 100% | Melhoria na SE São Luís II - substituição do reator reserva RTR1, 500 kV, 1x45,33 MVAR (Concluído) | dez-25 | 5.61 | 100 | 0 | 500 | 0 | 0 | MA | Yes | 13/10/25 | 31/12/42 | - | jun-25 | IPCA | Improvement | 0.77 | 3.80 | 1.19 | 1.35 | 058/2001 | Renewed | T2022-044 | |
| 88 | Substation | AXIA Norte | AXIA Norte | 100% | Melhoria na SE Marabá - Substituir o banco de capacitores série MBCL7-01, BC1 500 kV, 3x116 MVAr (Concluído) | dez-25 | 69.94 | 100 | 0 | 500 | 0 | 0 | PA | Yes | 14/12/25 | 31/12/42 | - | jun-25 | IPCA | Improvement | 5.45 | 8.68 | 22.64 | 15.30 | 058/2001 | Renewed | T2022-055 | |
| 89 | Substation | AXIA Norte | AXIA Norte | 100% | SE Imperatriz - Substituição do Banco de Capacitores Série (Concluído) | dez-25 | 48.42 | 100 | 0 | 500 | 0 | 163 | MA | Yes | 24/10/25 | 31/12/42 | - | jun-25 | IPCA | Reinforcement | 1.26 | 17.84 | 18.95 | 13.84 | 058/2001 | Renewed | T2022-102 | |
| 90 | Substation | AXIA Norte | AXIA Norte | 100% | Reforço na SE Sorriso: Instalação do 4º TF 230/69/13,8 kV, 1 x 60 MVA trifásico (Concluído) | dez-25 | 26.93 | 100 | 0 | 230 | 60 | 0 | MT | Yes | 11/11/25 | 31/12/42 | 4.37 | jun-25 | IPCA | Reinforcement | 1.04 | 4.76 | 9.01 | 11.11 | 058/2001 | Renewed | T2023-104 | |
| 91 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at SS Rondonópolis: Replacement of capacitor bank 13.8 kV, number 1. | dez-25 | 0.85 | 9 | 0 | 14 | 0 | 0 | MT | Yes | 02/08/27 | 31/12/42 | 0.17 | jun-25 | IPCA | Improvement | 0.04 | 0.00 | 0.00 | 0.00 | 058/2001 | Renewed | T2023-065 | |
| 92 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at SS Rondonópolis: Replacement of capacitor bank 13.8 kV, number 3. | dez-25 | 0.85 | 8 | 0 | 14 | 0 | 0 | MT | Yes | 02/08/27 | 31/12/42 | 0.17 | jun-25 | IPCA | Improvement | 0.04 | 0.00 | 0.00 | 0.00 | 058/2001 | Renewed | T2023-066 | |
| 93 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at SS Rondonópolis: Replacement of capacitor bank 13.8 kV, number 2. | dez-25 | 0.85 | 8 | 0 | 14 | 0 | 0 | MT | Yes | 02/08/27 | 31/12/42 | 0.17 | jun-25 | IPCA | Improvement | 0.04 | 0.00 | 0.00 | 0.00 | 058/2001 | Renewed | T2023-067 | |
| 94 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at SS Vila do Conde: replacement of power autotransformer bench - VCAT7 02 | dez-25 | 55.37 | 26 | 0 | 500 | 0 | 0 | PA | Yes | 02/08/27 | 31/12/42 | 8.78 | jun-25 | IPCA | Improvement | 1.74 | 0.05 | 3.18 | 0.50 | 058/2001 | Renewed | T2023-068 | |
| 95 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at SS Vila do Conde: replacement of the power autotransformer bank - VCAT7 01 | dez-25 | 36.91 | 26 | 0 | 500 | 0 | 0 | PA | Yes | 02/08/27 | 31/12/42 | 5.85 | jun-25 | IPCA | Improvement | 0.77 | 0.03 | 1.49 | 0.18 | 058/2001 | Renewed | T2023-069 | |
| 96 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at SS Marabá: reactor replacement - MBRE7 04 SUB MARABA only Phases A and V. | dez-25 | 12.29 | 20 | 0 | 500 | 0 | 0 | PA | Yes | 02/08/27 | 31/12/42 | 1.94 | jun-25 | IPCA | Improvement | 0.38 | 0.01 | 0.00 | 0.79 | 058/2001 | Renewed | T2023-070 | |
| 97 | Substation | AXIA Norte | AXIA Norte | 100% | Melhoria na SE Transamazônica: substituição do reator 230 kV 30 MVAr - TMRE6.01 (Concluído) | dez-25 | 11.43 | 100 | 0 | 230 | 0 | 0 | PA | Yes | 03/11/25 | 31/12/42 | - | jun-25 | IPCA | Improvement | 0.09 | 0.00 | 0.00 | 0.73 | 058/2001 | Renewed | T2023-071 | |
| 98 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at SS São Luís I: replacement of power transformer No. 03 230/69kV of 100MVA. | dez-25 | 15.53 | 14 | 0 | 230 | 0 | 0 | MA | Yes | 02/08/27 | 31/12/42 | 2.46 | jun-25 | IPCA | Improvement | 0.00 | 0.81 | 0.08 | 0.68 | 058/2001 | Renewed | T2023-072 | |
| 99 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at SS São Luís II: replacement of power autotransformers No. 01 500/230kV of 200MVA. | dez-25 | 48.96 | 14 | 0 | 500 | 0 | 0 | MA | Yes | 02/08/27 | 31/12/42 | 7.76 | jun-25 | IPCA | Improvement | 0.00 | 0.00 | 2.99 | 0.78 | 058/2001 | Renewed | T2023-073 | |
| 100 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at SS Couto Magalhaes: replacement of transformer 138/13.8kV - 15MVA - NUMBER 1 | dez-25 | 6.20 | 13 | 0 | 138 | 0 | 0 | MT | Yes | 02/02/27 | 31/12/42 | 0.98 | jun-25 | IPCA | Improvement | 0.22 | 0.31 | 0.00 | 0.07 | 058/2001 | Renewed | T2023-074 | |
| 101 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at SS Coxipó: replacement of Reactor 230kV 30MVAr number 1 of SS Coxipó - CXRE6-01 | dez-25 | 7.81 | 17 | 0 | 230 | 0 | 0 | MT | Yes | 02/02/27 | 31/12/42 | 1.23 | jun-25 | IPCA | Improvement | 0.31 | 0.06 | 0.19 | 0.11 | 058/2001 | Renewed | T2023-075 | |
| 102 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at SS Coxipó: replacement of Reactor 230kV 30MVAr number 2 of SS Coxipó - CXRE6-02. | dez-25 | 7.81 | 15 | 0 | 230 | 0 | 0 | MT | Yes | 02/02/27 | 31/12/42 | 1.23 | jun-25 | IPCA | Improvement | 0.30 | 0.05 | 0.23 | 0.36 | 058/2001 | Renewed | T2023-076 | |
| 103 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement at SS Pimenta Bueno: Installation of the 3rd Autotransformer 230/138 kV, 55 MVA. | dez-25 | 31.61 | 34 | 0 | 230 | 55 | 0 | RO | Yes | 25/06/26 | 31/12/42 | 4.82 | jun-25 | IPCA | Reinforcement | 0.00 | 2.23 | 2.78 | 3.15 | 058/2001 | Renewed | T2023-114 | |
| 104 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement at SS Marabá: replacement of the TF3 230/69 kV, 33 MVA, with a new 100 MVA unit. | dez-25 | 15.80 | 83 | 0 | 230 | 67 | 0 | PA | Yes | 30/06/26 | 31/12/42 | 2.47 | jun-25 | IPCA | Reinforcement | 0.48 | 1.00 | 1.11 | 1.76 | 058/2001 | Renewed | T2023-137 | |
| 105 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement at SS Presidente Dutra: replacement of TR1 500/230 kV, (3+1)x100 MVA, by (3+1)x150 MVA. | dez-25 | 74.68 | 14 | 0 | 500 | 150 | 0 | MA | Yes | 15/11/26 | 31/12/42 | 11.98 | jun-25 | IPCA | Reinforcement | 0.07 | 0.20 | 3.48 | 8.25 | 058/2001 | Renewed | T2023-134 | |
| 106 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement at SS Marabá: replacement of TR1 500/230 kV, 3x100 MVA, by 3x150 MVA. | dez-25 | 68.99 | 35 | 0 | 500 | 150 | 0 | PA | Yes | 30/07/26 | 31/12/42 | 10.94 | jun-25 | IPCA | Reinforcement | 0.16 | 2.72 | 2.75 | 15.45 | 058/2001 | Renewed | T2023-136 | |
| 107 | Substation | AXIA Norte | AXIA Norte | 100% | SS P. Dutra- Replacement of BC1 500 kV, 390 Mvar, from TL Imperatriz-PDutra, by another 543Mvar. | dez-25 | 103.17 | 12 | 0 | 500 | 0 | 153 | MA | Yes | 20/10/27 | 31/12/42 | 18.60 | jun-25 | IPCA | Reinforcement | 0.11 | 0.00 | 0.00 | 0.04 | 058/2001 | Renewed | T2023-153 | |
| 108 | Substation | AXIA Norte | AXIA Norte | 100% | SS Imperatriz- Replacement BC1 500 kV, 390 Mvar, of TL Imperatriz-PDutra, for another 543MVAr. | dez-25 | 103.17 | 12 | 0 | 500 | 0 | 153 | MA | Yes | 20/10/27 | 31/12/42 | 18.60 | jun-25 | IPCA | Reinforcement | 0.59 | 0.40 | 0.44 | 0.69 | 058/2001 | Renewed | T2023-154 | |
| 109 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at SS Rondonópolis: RT1 Line Reactor Replacement 230 kV, 30Mvar | dez-25 | 7.03 | 12 | 0 | 230 | 0 | 0 | MT | Yes | 21/03/28 | 31/12/42 | 1.12 | jun-25 | IPCA | Improvement | 0.00 | 0.26 | 0.00 | 0.05 | 058/2001 | Renewed | T2024-069 | |
| 110 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at SS Imperatriz: TF4 Three Phase Transformer Replacement, 230/69/13.8 kV, 100 MVA | dez-25 | 13.99 | 8 | 0 | 230 | 0 | 0 | MA | Yes | 21/03/28 | 31/12/42 | 2.15 | jun-25 | IPCA | Improvement | 0.02 | 0.02 | 0.03 | 0.09 | 058/2001 | Renewed | T2024-070 | |
| 111 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at SS São Luis I: Replacement of Three-Phase Transformer TF4 230/69 kV, 100 MVA | dez-25 | 13.99 | 10 | 0 | 230 | 0 | 0 | MA | Yes | 21/09/28 | 31/12/42 | 2.15 | jun-25 | IPCA | Improvement | 0.01 | 0.04 | 0.00 | 0.11 | 058/2001 | Renewed | T2024-071 | |
| 112 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at SS Presidente Dutra: Replacement of Reactor Bank RT3, 525 kV, 150 Mvar | dez-25 | 16.74 | 1 | 0 | 525 | 0 | 0 | MA | Yes | 21/09/28 | 31/12/42 | 2.56 | jun-25 | IPCA | Improvement | 0.00 | 0.00 | 0.02 | 0.14 | 058/2001 | Renewed | T2024-072 | |
| 113 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at SS Presidente Dutra: Replacement of Reactor Bank RT2, 525 kV, 150 Mvar | dez-25 | 16.74 | 2 | 0 | 525 | 0 | 0 | MA | Yes | 21/09/28 | 31/12/42 | 2.56 | jun-25 | IPCA | Improvement | 0.00 | 0.01 | 0.00 | 0.12 | 058/2001 | Renewed | T2024-073 | |
| 114 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at SS Presidente Dutra: Replacement of RTR1 Reserve Reactor, 525 kV, 50 Mvar | dez-25 | 5.58 | 2 | 0 | 525 | 0 | 0 | MA | Yes | 21/09/28 | 31/12/42 | 0.85 | jun-25 | IPCA | Improvement | 0.00 | 0.03 | 0.01 | 0.04 | 058/2001 | Renewed | T2024-074 | |
| 115 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement in SS Rondonópolis: replacement of transformer RPAT6-01 230/138/13.8 kV | dez-25 | 39.69 | 13 | 0 | 230 | 78 | 0 | MT | Yes | 28/11/26 | 31/12/42 | 6.29 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.13 | 1.75 | 058/2001 | Renewed | T2024-119 | |
| 116 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement in SS Rondonópolis: replacement of transformer RPAT6-02 230/138/13.8 kV | dez-25 | 39.69 | 14 | 0 | 230 | 78 | 0 | MT | Yes | 28/11/26 | 31/12/42 | 6.29 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.07 | 0.04 | 058/2001 | Renewed | T2024-127 | |
| 117 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | SE Adrianópolis - Substituição Reator, AT53, AT1B, AT2A e AT2B (Concluído) | dez-25 | 71.80 | 100 | 0 | 500 | 0 | 0 | RJ | Yes | 23/12/25 | 31/12/42 | 0.97 | jun-25 | IPCA | Improvement | 0.08 | 0.64 | 0.24 | 1.47 | 062/2001 | Renewed | T2019-021 | |
| 118 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | SS Angra 7R | dez-25 | 12.98 | 75 | 0 | 500 | 0 | 0 | RJ | Yes | 20/02/26 | 31/12/42 | 1.60 | jun-25 | IPCA | Improvement | 0.00 | 0.00 | 0.02 | 0.73 | 062/2001 | Renewed | T2017-068 | |
| 119 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | SS Campos 20R | dez-25 | 80.51 | 96 | 0 | 138 | 0 | 0 | RJ | Yes | 01/03/26 | 31/12/42 | 5.03 | jun-25 | IPCA | Improvement | 1.28 | 0.68 | 0.61 | 8.29 | 062/2001 | Renewed | T2017-073 | |
| 120 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | SS Poços de Caldas 19R | dez-25 | 86.06 | 77 | 0 | 500 | 40 | 0 | MG | Yes | 01/05/27 | 31/12/42 | 12.68 | jun-25 | IPCA | Reinforcement | 0.73 | 0.89 | 0.53 | 3.94 | 062/2001 | Renewed | T2021-075 | |
| 121 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | SS Campinas | dez-25 | 56.08 | 81 | 0 | 500 | 0 | 136 | SP | Yes | 07/05/26 | 31/12/42 | 11.17 | jun-25 | IPCA | Reinforcement | 1.67 | 5.04 | 0.34 | 7.48 | 062/2001 | Renewed | T2021-053 | |
| 122 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | SE Ivaiporã - substituição da fase B e C do reator monofásico RIA1, 750 kV, 2x110 MVAr (Concluído) | dez-25 | 24.16 | 100 | 0 | 750 | 0 | 0 | PR | Yes | 24/10/25 | 31/12/42 | - | jun-25 | IPCA | Improvement | 0.27 | 0.98 | 0.32 | 1.01 | 062/2001 | Renewed | T2022-006 | |
| 123 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | SS Cach. Paulista - replacement of the single-phase transformer TR57, 500/138 kV, 3x83.33 MVA | dez-25 | 41.87 | 29 | 0 | 500 | 0 | 0 | SP | Yes | 05/04/27 | 31/12/42 | 6.42 | jun-25 | IPCA | Improvement | 0.27 | 4.62 | 9.32 | 12.64 | 062/2001 | Renewed | T2022-010 | |
| 124 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | SS Cach. Paulista - replacement of the single-phase transformer TR59, 500/138 kV, 3x83.33 MVA | dez-25 | 41.87 | 31 | 0 | 500 | 0 | 0 | SP | Yes | 05/04/27 | 31/12/42 | 6.42 | jun-25 | IPCA | Improvement | 0.27 | 4.62 | 9.32 | 12.64 | 062/2001 | Renewed | T2022-011 | |
| 125 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | SS Cach. Paulista - replacement of the reserve transformer TRR1, 500/138 kV, 1x83.33 MVA | dez-25 | 13.96 | 23 | 0 | 500 | 0 | 0 | SP | Yes | 05/04/27 | 31/12/42 | 2.14 | jun-25 | IPCA | Improvement | 0.09 | 1.54 | 3.11 | 4.21 | 062/2001 | Renewed | T2022-012 | |
| 126 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | SS Campinas - replacement of the single-phase transformer TR51, 500/345 kV, 3x186.66 MVA | dez-25 | 61.87 | 63 | 0 | 500 | 0 | 0 | SP | Yes | 05/04/27 | 31/12/42 | 9.48 | jun-25 | IPCA | Improvement | 3.15 | 11.00 | 0.20 | 19.72 | 062/2001 | Renewed | T2022-013 | |
| 127 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | SE Araraquara FUR - Substituição do reator RTPC, 500kV, 3x24,4667 MVAr (Concluído) | dez-25 | 15.90 | 100 | 0 | 500 | 0 | 0 | SP | Yes | 18/12/25 | 31/12/42 | 2.49 | jun-25 | IPCA | Improvement | 0.26 | 0.42 | 1.84 | 3.03 | 062/2001 | Renewed | T2022-047 | |
| 128 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | SE Araraquara FUR - Substituição do reator RMR1, 500kV, 3x24,4667 MVAr (Concluído) | dez-25 | 15.77 | 100 | 0 | 500 | 0 | 0 | SP | Yes | 07/11/25 | 31/12/42 | - | jun-25 | IPCA | Improvement | 0.26 | 0.42 | 1.84 | 3.03 | 062/2001 | Renewed | T2022-048 | |
| 129 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | SS Ivaiporã - Replacement of compensation series TL 765kV Ivaiporã / Itaberá C1 | dez-25 | 145.62 | 94 | 0 | 765 | 0 | 0 | PR | Yes | 14/03/26 | 31/12/42 | 25.17 | jun-25 | IPCA | Improvement | 1.42 | 27.82 | 7.18 | 24.35 | 062/2001 | Renewed | T2022-058 | |
| 130 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | SS Itaberá - Replacement of the series compensation of 765kV Itaberá / Tijuco Preto C1 | dez-25 | 152.20 | 98 | 0 | 765 | 0 | 0 | SP | Yes | 14/03/26 | 31/12/42 | 26.30 | jun-25 | IPCA | Improvement | 1.21 | 27.30 | 10.12 | 25.74 | 062/2001 | Renewed | T2022-061 | |
| 131 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | SE Itabera - Substituição das fases A e B do banco de reatores RT1 765kV (Concluído) | dez-25 | 11.41 | 100 | 0 | 765 | 0 | 0 | SP | Yes | 20/12/25 | 31/12/42 | 2.44 | jun-25 | IPCA | Improvement | 0.03 | 0.04 | 0.19 | 1.15 | 062/2001 | Renewed | T2022-064 | |
| 132 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | SS Cachoeira Paulista - Replacement of single-phase reserve reactor RTR2 | dez-25 | 6.10 | 23 | 0 | 500 | 0 | 0 | SP | Yes | 14/09/27 | 31/12/42 | 0.94 | jun-25 | IPCA | Improvement | 0.04 | 0.76 | 1.54 | 2.08 | 062/2001 | Renewed | T2022-103 | |
| 133 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | SE Araraquara - Substituição de Reator Monofásico Reserva RTR1, 500kV, 27MVAr (Concluído) | dez-25 | 5.48 | 100 | 0 | 500 | 0 | 0 | SP | Yes | 07/11/25 | 31/12/42 | - | jun-25 | IPCA | Improvement | 0.10 | 0.16 | 0.71 | 1.17 | 062/2001 | Renewed | T2022-104 | |
| 134 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | SS Ivaiporã - Replacement of the TL Series Capacitor Bank for Foz do Iguaçu - C1 | dez-25 | 146.40 | 94 | 0 | 750 | 0 | 0 | PR | Yes | 14/03/26 | 31/12/42 | 25.48 | jun-25 | IPCA | Improvement | 1.60 | 31.47 | 8.13 | 27.54 | 062/2001 | Renewed | T2022-117 | |
| 135 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | refurbishment of the HVDC System | dez-25 | 1,851.83 | 76 | 0 | 600 | 0 | 0 | PR | No | 04/10/26 | 31/12/42 | - | jun-25 | IPCA | Improvement | 82.60 | 76.43 | 676.88 | 191.95 | 062/2001 | Renewed | T2023-001 | refurbishment of the HVDC System |
| 136 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | SS 138/13.8 kV Angra - Transformation 138/13.8 kV - 15 MVA. | dez-25 | 16.74 | 19 | 0 | 138 | 8 | 0 | RJ | Yes | 07/05/26 | 31/12/42 | 2.69 | jun-25 | IPCA | Reinforcement | 0.02 | 0.02 | 0.45 | 1.80 | 062/2001 | Renewed | T2023-187 | |
| 137 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Reinforcement at SS Resende: Installation of the 1st RTB 500 kV - (3+1)x66.66 Mvar | dez-25 | 29.17 | 60 | 0 | 500 | 0 | 200 | RJ | Yes | 28/03/26 | 31/12/42 | 4.62 | jun-25 | IPCA | Reinforcement | 0.03 | 1.42 | 0.78 | 15.43 | 062/2001 | Renewed | T2023-167 | |
| 138 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Installation of the reserve phase for the 1st RTB 500 kV - (3+1)x66.66 Mvar, at SS Resende. | dez-25 | 5.32 | 60 | 0 | 500 | 0 | 0 | RJ | Yes | 28/03/26 | 31/12/42 | 0.84 | jun-25 | IPCA | Reinforcement | 0.01 | 0.26 | 0.14 | 2.82 | 062/2001 | Renewed | T2023-167-A | |
| 139 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Reinforcement at SS Ivaiporã: Installation of the 2nd RTB 765 kV - 3x110 Mvar | dez-25 | 44.26 | 28 | 0 | 765 | 0 | 330 | PR | Yes | 22/01/27 | 31/12/42 | 6.98 | jun-25 | IPCA | Reinforcement | 0.01 | 0.03 | 4.71 | 1.25 | 062/2001 | Renewed | T2023-166 | |
| 140 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Installation of the reserve phase for the 2nd RTB 765 kV - (3+1)x66.66 Mvar, at SS Ivaiporã | dez-25 | 8.21 | 28 | 0 | 765 | 0 | 0 | PR | Yes | 25/01/27 | 31/12/42 | 1.29 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.87 | 0.23 | 062/2001 | Renewed | T2023-166-A | |
| 141 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Reinforcement at SS Baixada Fluminense: Installation of the 1st RTB 500 kV - (3+1)x66.66 Mvar | dez-25 | 48.52 | 31 | 0 | 500 | 0 | 200 | RJ | Yes | 01/05/26 | 31/12/42 | 7.70 | jun-25 | IPCA | Reinforcement | 0.01 | 3.50 | 4.34 | 15.31 | 062/2001 | Renewed | T2023-168 | |
| 142 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Installation of the reserve phase for the 1st RTB 500 kV - (3+1)x66.66 Mvar, at SS Baixada Fluminense | dez-25 | 5.31 | 50 | 0 | 500 | 0 | 0 | RJ | Yes | 01/06/26 | 31/12/42 | 0.84 | jun-25 | IPCA | Reinforcement | 0.00 | 0.65 | 0.80 | 2.84 | 062/2001 | Renewed | T2023-168-A | |
| 143 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Reinforcement at SS Ibiúna: Installation of the 1st RTB 345 kV - 3x44 Mvar | dez-25 | 37.76 | 41 | 0 | 345 | 0 | 132 | SP | Yes | 25/03/27 | 31/12/42 | 6.01 | jun-25 | IPCA | Reinforcement | 0.01 | 2.22 | 0.45 | 4.82 | 062/2001 | Renewed | T2023-169 | |
| 144 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Installation of the reserve phase for the 1st RTB 345 kV - (3+1)x44 Mvar, at SS Ibiúna. | dez-25 | 3.74 | 20 | 0 | 345 | 0 | 0 | SP | Yes | 06/10/26 | 31/12/42 | 0.60 | jun-25 | IPCA | Reinforcement | 0.00 | 0.22 | 0.04 | 0.48 | 062/2001 | Renewed | T2023-169-A | |
| 145 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Reinforcement at SS Ibiúna: Installation of the 2nd RTB 345 kV - 3x44 Mvar | dez-25 | 22.34 | 20 | 0 | 345 | 0 | 132 | SP | Yes | 25/03/27 | 31/12/42 | 3.56 | jun-25 | IPCA | Reinforcement | 0.01 | 1.31 | 0.27 | 2.85 | 062/2001 | Renewed | T2023-171 | |
| 146 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Installation of the reserve phase for the 2nd RTB 345 kV - (3+1)x44 Mvar, at SS Ibiúna | dez-25 | 3.74 | 20 | 0 | 345 | 0 | 0 | SP | Yes | 25/03/27 | 31/12/42 | 0.60 | jun-25 | IPCA | Reinforcement | 0.00 | 0.22 | 0.04 | 0.48 | 062/2001 | Renewed | T2023-171-A | |
| 147 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Reinforcement at SS Vitória: Replacement of ATR1 345/138 kV by new bank (3+1)x133.33MVA. | dez-25 | 77.83 | 7 | 0 | 345 | 175 | 0 | ES | Yes | 26/07/26 | 31/12/42 | 12.26 | jun-25 | IPCA | Reinforcement | 0.03 | 0.17 | 0.15 | 5.62 | 062/2001 | Renewed | T2023-190 | |
| 148 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | SS Guarulhos: Installation of the first bank of busbar reactors at 345 kV | dez-25 | 35.53 | 11 | 0 | 345 | 0 | 132 | SP | Yes | 29/12/26 | 31/12/42 | 5.74 | jun-25 | IPCA | Reinforcement | 0.01 | 1.76 | 0.06 | 3.51 | 062/2001 | Renewed | T2024-001 | |
| 149 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | SS Guarulhos: Installation of a reserve phase for RT1, 345 kV, 44MVar | dez-25 | 3.80 | 9 | 0 | 345 | 0 | 0 | SP | Yes | 29/12/26 | 31/12/42 | 0.60 | jun-25 | IPCA | Reinforcement | 0.00 | 0.18 | 0.01 | 0.37 | 062/2001 | Renewed | T2024-002 | |
| 150 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | SS Guarulhos: Installation of second bar reactor bank, 345 kV, 3x44MVar | dez-25 | 35.41 | 11 | 0 | 345 | 0 | 132 | SP | Yes | 28/01/27 | 31/12/42 | 5.72 | jun-25 | IPCA | Reinforcement | 0.01 | 1.75 | 0.06 | 3.50 | 062/2001 | Renewed | T2024-003 | |
| 151 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | SS Guarulhos: Installation of a reserve phase for RT2, 345 kV, 44MVar | dez-25 | 3.80 | 9 | 0 | 345 | 0 | 0 | SP | Yes | 28/01/27 | 31/12/42 | 0.60 | jun-25 | IPCA | Reinforcement | 0.00 | 0.18 | 0.01 | 0.37 | 062/2001 | Renewed | T2024-004 | |
| 152 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at SS TIJUCO PRETO: BC03 Capacitor Bank Replacement | dez-25 | 4.56 | 14 | 0 | 345 | 0 | 0 | SP | Yes | 12/09/27 | 31/12/42 | 0.84 | jun-25 | IPCA | Improvement | 0.01 | 0.00 | 0.02 | 0.11 | 062/2001 | Renewed | T2024-075 | |
| 153 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at SS BANDEIRANTES 345 Kv: Replacement of capacitor bank | dez-25 | 4.04 | 8 | 0 | 345 | 0 | 0 | GO | Yes | 08/10/26 | 31/12/42 | 0.71 | jun-25 | IPCA | Improvement | 0.03 | 0.01 | 0.03 | 0.05 | 062/2001 | Renewed | T2024-076 | |
| 154 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Melhoria na SE P. COLOMBIA 138 Kv: Substituição do transformador TR5MVA (Concluído) | dez-25 | 3.03 | 100 | 0 | 138 | 0 | 0 | MG | Yes | 19/12/25 | 31/12/42 | 0.60 | jun-25 | IPCA | Improvement | 0.54 | 0.55 | 0.32 | 1.01 | 062/2001 | Renewed | T2024-077 | |
| 155 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at SS Ivaipora Fur: Replacement of RT1A reactor PHASES A, B and C | dez-25 | 4.96 | 18 | 0 | 69 | 0 | 0 | PR | Yes | 08/04/27 | 31/12/42 | 0.81 | jun-25 | IPCA | Improvement | 0.00 | 0.00 | 0.01 | 0.44 | 062/2001 | Renewed | T2024-079 | |
| 156 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at SS Tijuco Preto: Replacement of BC07 345 kV Capacitor Bank | dez-25 | 4.62 | 13 | 0 | 345 | 0 | 0 | SP | Yes | 12/09/27 | 31/12/42 | 0.84 | jun-25 | IPCA | Improvement | 0.02 | 0.00 | 0.06 | 0.26 | 062/2001 | Renewed | T2024-080 | |
| 157 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at SS Ivaipora Fur: Replacement of TRRG09V power transformer | dez-25 | 28.10 | 41 | 0 | 525 | 0 | 0 | PR | Yes | 08/04/27 | 31/12/42 | 4.57 | jun-25 | IPCA | Improvement | 0.01 | 0.01 | 0.03 | 2.47 | 062/2001 | Renewed | T2024-082 | |
| 158 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at SS IVAIPORA FUR: Replacement of RT1B reactor PHASE A, B and C | dez-25 | 4.96 | 18 | 0 | 69 | 0 | 0 | PR | Yes | 08/04/27 | 31/12/42 | 0.81 | jun-25 | IPCA | Improvement | 0.00 | 0.00 | 0.01 | 0.44 | 062/2001 | Renewed | T2024-083 | |
| 159 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at SS TIJUCO PRETO: Replacement of RTIATP2 reactor PHASES B and C | dez-25 | 17.47 | 11 | 0 | 765 | 0 | 0 | SP | Yes | 12/09/27 | 31/12/42 | 2.84 | jun-25 | IPCA | Improvement | 0.02 | 0.01 | 0.05 | 4.05 | 062/2001 | Renewed | T2024-085 | |
| 160 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at SS IVAIPORA FUR: Replacement of RT1C reactor PHASE A, B and C | dez-25 | 4.96 | 18 | 0 | 69 | 0 | 0 | PR | Yes | 08/04/27 | 31/12/42 | 0.81 | jun-25 | IPCA | Improvement | 0.00 | 0.00 | 0.01 | 0.44 | 062/2001 | Renewed | T2024-086 | |
| 161 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at SS TIJUCO PRETO: Replacement of reactor RT01 PHASES A, B and C | dez-25 | 4.91 | 14 | 0 | 69 | 0 | 0 | SP | Yes | 12/09/27 | 31/12/42 | 0.81 | jun-25 | IPCA | Improvement | 0.00 | 0.00 | 0.03 | 1.67 | 062/2001 | Renewed | T2024-088 | |
| 162 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at SS TIJUCO PRETO: Replacement of reactor RT02 PHASE A, B and C | dez-25 | 4.91 | 16 | 0 | 69 | 0 | 0 | SP | Yes | 08/04/28 | 31/12/42 | 0.81 | jun-25 | IPCA | Improvement | 0.00 | 0.00 | 0.03 | 1.67 | 062/2001 | Renewed | T2024-089 | |
| 163 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at SS BANDEIRANTES: Replacement of LINE REACTOR - RTBDSB1 PHASES A, B and C | dez-25 | 11.28 | 9 | 0 | 345 | 0 | 0 | GO | Yes | 08/04/26 | 31/12/42 | 1.82 | jun-25 | IPCA | Improvement | 0.04 | 0.03 | 1.18 | 0.10 | 062/2001 | Renewed | T2024-090 | |
| 164 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at SS IVAIPORA FUR: Replacement of AT129V power transformer - RESERVE AUTOTRAFO | dez-25 | 22.26 | 18 | 0 | 765 | 0 | 0 | PR | Yes | 08/04/27 | 31/12/42 | 3.62 | jun-25 | IPCA | Improvement | 0.01 | 0.01 | 0.03 | 1.95 | 062/2001 | Renewed | T2024-091 | |
| 165 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at SS RIO VERDE FUR: Replacement of AT76V power transformer - RESERVE AUTOTRAFO | dez-25 | 7.72 | 9 | 0 | 230 | 0 | 0 | GO | Yes | 08/04/27 | 31/12/42 | 1.26 | jun-25 | IPCA | Improvement | 0.00 | 0.01 | 0.03 | 0.71 | 062/2001 | Renewed | T2024-092 | |
| 166 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at SS BANDEIRANTES: Replacement of AT87V power transformer - RESERVE AUTOTRAFO | dez-25 | 10.65 | 11 | 0 | 345 | 0 | 0 | GO | Yes | 08/04/26 | 31/12/42 | 1.72 | jun-25 | IPCA | Improvement | 0.02 | 0.91 | 0.02 | 0.05 | 062/2001 | Renewed | T2024-093 | |
| 167 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at SS Itaberá: Replacement of RIV1 line reactor bank 765 kV, 3x109.67 Mvar | dez-25 | 26.08 | 20 | 0 | 765 | 0 | 0 | SP | Yes | 08/04/28 | 31/12/42 | 4.25 | jun-25 | IPCA | Improvement | 0.02 | 0.03 | 0.06 | 5.84 | 062/2001 | Renewed | T2024-095 | |
| 168 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Melhoria na SE Adrianópolis: Substituição do banco de transformadores TR2A 345/138 kV, 3x75 MVA (Concluído) | dez-25 | 11.92 | 100 | 0 | 345 | 0 | 0 | RJ | Yes | 28/12/25 | 31/12/42 | 1.63 | jun-25 | IPCA | Improvement | 0.09 | 0.98 | 0.38 | 9.83 | 062/2001 | Renewed | T2024-096 | |
| 169 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at SS Marimbondo: Replacement of reserve transformer TRR1 500/345 kV, 62.33 Mvar | dez-25 | 14.48 | 9 | 0 | 500 | 0 | 0 | MG | Yes | 08/04/27 | 31/12/42 | 2.37 | jun-25 | IPCA | Improvement | 0.03 | 0.02 | 0.05 | 1.99 | 062/2001 | Renewed | T2024-097 | |
| 170 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at SS Rio Verde Furnas: Replacement of autotransformer bank TR1 230/138 kV | dez-25 | 23.15 | 8 | 0 | 230 | 0 | 0 | GO | Yes | 08/04/27 | 31/12/42 | 3.79 | jun-25 | IPCA | Improvement | 0.00 | 0.03 | 0.08 | 2.14 | 062/2001 | Renewed | T2024-100 | |
| 171 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at SS Barro Alto: Replacement of transformer bank TR1 230/69 kV, 3x16.67 MVA | dez-25 | 16.30 | 8 | 0 | 230 | 0 | 0 | GO | Yes | 08/04/27 | 31/12/42 | 2.67 | jun-25 | IPCA | Improvement | 0.15 | 0.06 | 0.08 | 2.24 | 062/2001 | Renewed | T2024-101 | |
| 172 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at SS Brasília Sul: Replacement of C-phase of autotransformer TR4, 345/138 kV, 50 MVA | dez-25 | 8.88 | 6 | 0 | 345 | 0 | 0 | DF | Yes | 08/04/27 | 31/12/42 | 1.44 | jun-25 | IPCA | Improvement | 0.01 | 0.02 | 0.10 | 1.24 | 062/2001 | Renewed | T2024-102 | |
| 173 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at SS Ivaipora Fur: AT01 power transformer replacement PHASES A and C | dez-25 | 44.55 | 18 | 0 | 750 | 0 | 0 | PR | Yes | 25/04/27 | 31/12/42 | 7.25 | jun-25 | IPCA | Improvement | 0.02 | 0.02 | 0.05 | 3.92 | 062/2001 | Renewed | T2024-078 | |
| 174 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement in SS MARIMBONDO 500 kV: Replacement of power transformer AT09 500/345KV PHASE A, B and C | dez-25 | 43.64 | 6 | 0 | 500 | 0 | 0 | MG | Yes | 25/04/27 | 31/12/42 | 7.10 | jun-25 | IPCA | Improvement | 0.09 | 0.05 | 0.15 | 5.96 | 062/2001 | Renewed | T2024-081 | |
| 175 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at SS TIJUCO PRETO: TRRG 03 power transformer replacement - PHASES A, B and C | dez-25 | 84.33 | 40 | 0 | 500 | 0 | 0 | SP | Yes | 25/04/28 | 31/12/42 | 13.76 | jun-25 | IPCA | Improvement | 0.00 | 0.02 | 0.05 | 7.03 | 062/2001 | Renewed | T2024-087 | |
| 176 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at SS Tijuco Preto: Replacement of TR3 750/500 kV, 3x550 MVA autotransformer bank | dez-25 | 66.24 | 40 | 0 | 750 | 0 | 0 | SP | Yes | 25/04/28 | 31/12/42 | 10.81 | jun-25 | IPCA | Improvement | 0.00 | 0.02 | 0.04 | 5.52 | 062/2001 | Renewed | T2024-098 | |
| 177 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Reinforcement at SS Campinas: Replacement of 345/138 kV autotransformer bank TR1 | dez-25 | 33.62 | 8 | 0 | 345 | 150 | 0 | SP | Yes | 01/05/27 | 31/12/42 | 5.45 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 3.61 | 0.22 | 062/2001 | Renewed | T2024-122 | |
| 178 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Reinforcement at SS Campinas: Replacement of the backup autotransformer 345/138 kV, from 50MVA to 100 MVA | dez-25 | 11.21 | 0 | 0 | 345 | 0 | 0 | SP | Yes | 13/11/26 | 31/12/42 | 1.82 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 1.20 | 0.07 | 062/2001 | Renewed | T2024-123 | |
| 179 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Reinforcement at SS Campinas: Replacement of 345/138 kV autotransformer bank TR2 | dez-25 | 33.62 | 6 | 0 | 345 | 150 | 0 | SP | Yes | 13/11/26 | 31/12/42 | 5.45 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 3.61 | 0.22 | 062/2001 | Renewed | T2024-133 | |
| 180 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Reinforcement at SS Campinas: Replacement of 345/138 kV TR3 autotransformer bank | dez-25 | 33.62 | 0 | 0 | 345 | 150 | 0 | SP | Yes | 13/11/26 | 31/12/42 | 5.45 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 3.61 | 0.22 | 062/2001 | Renewed | T2024-134 | |
| 181 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Reinforcement at SS Campinas: Replacement of 345/138 kV TR4 autotransformer bank | dez-25 | 33.62 | 0 | 0 | 345 | 150 | 0 | SP | Yes | 13/11/26 | 31/12/42 | 5.45 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 3.61 | 0.22 | 062/2001 | Renewed | T2024-135 | |
| 182 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at SS Ivaiporã: Replacement of TRRG01 power transformer | dez-25 | 89.85 | 18 | 0 | 500 | 0 | 0 | PR | Yes | 30/09/27 | 31/12/42 | 14.75 | jun-25 | IPCA | Improvement | 0.03 | 0.04 | 0.11 | 8.24 | 062/2001 | Renewed | T2024-190 | |
| 183 | Substation | Nova Era Catarina | AXIA Energia Norte | 100% | SS 230/138 kV Chapecoense and existing TL sectioning | mai-24 | 183.25 | 43 | 15 | 230 | 300 | 0 | SC | Yes | 30/12/27 | 28/06/54 | 12.70 | jun-25 | IPCA | Expansion | NA | NA | NA | NA | 012/2024 | Bidder | T2024-201 | |
| 184 | Substation and Transmission Line | Nova Era Ceará | AXIA Energia Norte | 100% | SS 500/230 kV Morada Nova, TL 500 kV Morada Nova - Pacatuba, various TL and existing TL sectioning | mai-24 | 981.50 | 31 | 337 | 500 | 900 | 0 | CE | Yes | 30/06/29 | 28/06/54 | 124.98 | jun-25 | IPCA | Expansion | NA | NA | NA | NA | 006/2024 | Bidder | T2024-195 | |
| 185 | Substation and Transmission Line | Nova Era Integração | AXIA Energia Norte | 100% | SS 500/230 kV Zebu III, SS 500/230/138 kV Bom Nome II, various TL and existing TL sectioning | mai-24 | 2,643.00 | 28 | 1082 | 500 | 3900 | 1290 | PB, PE, AL, BA | Yes | 30/12/29 | 28/06/54 | 329.66 | jun-25 | IPCA | Expansion | NA | NA | NA | NA | 008/2024 | Bidder | T2024-197 | |
| 186 | Substation and Transmission Line | Nova Era Teresina | AXIA Energia Norte | 100% | SS 500 kV Teresina IV, SS 500 kV Crateús, various TL and existing TL sectioning | mai-24 | 1,755.00 | 33 | 534 | 500 | 0 | 960 | PI, CE | Yes | 30/06/29 | 28/06/54 | 177.26 | jun-25 | IPCA | Expansion | NA | NA | NA | NA | 004/2024 | Bidder | T2024-193 | |
| 187 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Reinforcement at SS São José: Replacement of TR11 with TF 500/138kV, 3 x 300 MVA | dez-25 | 81.05 | 14 | 0 | 500 | 700 | 0 | RJ | Yes | 11/06/27 | 31/12/42 | 13.35 | jun-25 | IPCA | Reinforcement | 0.01 | 0.06 | 0.22 | 10.27 | 062/2001 | Renewed | T2024-225 | |
| 188 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Reinforcement at SS São José: Replacement of TR12 with TF 500/138kV, 3 x 300 MVA | dez-25 | 81.05 | 14 | 0 | 500 | 300 | 0 | RJ | Yes | 11/06/27 | 31/12/42 | 13.35 | jun-25 | IPCA | Reinforcement | 0.00 | 0.02 | 0.10 | 10.22 | 062/2001 | Renewed | T2024-226 | |
| 189 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Reinforcement at SS São José: Replacement of the Reserve Phase for TR11 and TR12 - TF 500/138kV, 1 x 300 MVA | dez-25 | 20.02 | 14 | 0 | 500 | 0 | 0 | RJ | Yes | 11/06/27 | 31/12/42 | 3.30 | jun-25 | IPCA | Reinforcement | 0.00 | 0.07 | 0.12 | 3.37 | 062/2001 | Renewed | T2024-227 | |
| 190 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement at SS Presidente Dutra: Bar reactor reserve phase 50 MVar - 550 kV | dez-25 | 4.77 | 94 | 0 | 500 | 0 | 50 | MA | Yes | 07/10/26 | 31/12/42 | 0.79 | jun-25 | IPCA | Reinforcement | 0.07 | 0.66 | 1.98 | 6.21 | 058/2001 | Renewed | T2024-156 | |
| 191 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement at SS Imperatriz: Installation of the 4th TR230/69 kV - 100 MVA and connections | dez-25 | 26.34 | 10 | 0 | 230 | 100 | 0 | MA | Yes | 09/04/27 | 31/12/42 | 4.55 | jun-25 | IPCA | Reinforcement | 0.00 | 0.01 | 0.05 | 0.06 | 058/2001 | Renewed | T2024-151 | |
| 192 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement at SS Ji-Paraná: Replacement of the 60 MVA TR1 230/69 kV with 100 MVA | dez-25 | 25.83 | 6 | 0 | 230 | 40 | 0 | RO | Yes | 09/04/27 | 31/12/42 | 4.42 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.10 | 0.29 | 058/2001 | Renewed | T2024-152 | |
| 193 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement at SS Ji-Paraná: Installation of the 3rd TF 230/138/13.8 kV | dez-25 | 30.36 | 7 | 0 | 230 | 100 | 0 | RO | Yes | 09/04/27 | 31/12/42 | 5.21 | jun-25 | IPCA | Reinforcement | 0.00 | 0.05 | 0.07 | 0.28 | 058/2001 | Renewed | T2024-153 | |
| 194 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement at SS Vilhena: 3rd TF 230/69/13.8 kV | dez-25 | 24.85 | 6 | 0 | 230 | 60 | 0 | RO | Yes | 09/04/27 | 31/12/42 | 4.26 | jun-25 | IPCA | Reinforcement | 0.00 | 0.08 | 0.23 | 0.13 | 058/2001 | Renewed | T2024-157 | |
| 195 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement at SS Ji-Paraná: Replacement of the 60 MVA TR2 230/69 kV with 100 MVA | dez-25 | 25.83 | 8 | 0 | 230 | 40 | 0 | RO | Yes | 09/04/27 | 31/12/42 | 4.42 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.06 | 0.29 | 058/2001 | Renewed | T2024-215 | |
| 196 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement at SS Nobres: Installation of the 3rd TF 230/138/13.8 kV | dez-25 | 31.91 | 4 | 0 | 230 | 100 | 0 | MT | Yes | 23/04/27 | 31/12/42 | 5.36 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.10 | 0.36 | 058/2001 | Renewed | T2024-154 | |
| 197 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement at SS Porto Franco: 4th TR 230/69/13.8 kV - 100 MVA and connections | dez-25 | 33.32 | 14 | 0 | 230 | 100 | 0 | MA | Yes | 23/04/27 | 31/12/42 | 5.57 | jun-25 | IPCA | Reinforcement | 0.01 | 0.01 | 0.06 | 0.11 | 058/2001 | Renewed | T2024-155 | |
| 198 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement at SS Porto Velho: Installation of the 5th TF 230/69 kV – 1 x 150 MVA and Connections | dez-25 | 30.13 | 5 | 0 | 230 | 150 | 0 | RO | Yes | 28/05/27 | 31/12/42 | 5.12 | jun-25 | IPCA | Reinforcement | 0.00 | 0.07 | 0.31 | 0.65 | 058/2001 | Renewed | T2024-228 | |
| 199 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement at SS Arapiraca III: Installation of the 3rd 230/69 kV Three-Phase Power Transformer | dez-25 | 26.34 | 63 | 0 | 230 | 100 | 0 | AL | Yes | 09/04/27 | 06/10/40 | 3.54 | jun-25 | IPCA | Reinforcement | 0.04 | 0.06 | 0.14 | 0.36 | 013/2010 | Bidder | T2024-191 | |
| 200 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement at SS Teixeira de Freitas II: Installation of the 3rd 230/138 kV Single Phase AT - 3 x 33.33 MVA | dez-25 | 36.95 | 0 | 0 | 230 | 100 | 0 | BA | Yes | 09/04/27 | 16/10/38 | 5.01 | jun-25 | IPCA | Reinforcement | 0.01 | 0.00 | 0.09 | 0.24 | 014/2008 | Bidder | T2024-192 | |
| 201 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement at SS IBICOARA: Installation of the 3rd ATF 230/138 kV, 1 x 100 MVA and connections | dez-25 | 29.18 | 0 | 0 | 230 | 100 | 0 | BA | Yes | 28/05/27 | 11/06/37 | 3.97 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.12 | 0.29 | 010/2007 | Bidder | T2024-230 | |
| 202 | Transmission Line | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement: Sectioning of TL 230kV Bom Nome-PauloAfonso III C3 at SS Zebu III | dez-25 | 16.08 | 0 | 2 | 230 | 0 | 0 | AL | Yes | 03/01/30 | 31/12/42 | 2.72 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.00 | 0.13 | 061/2001 | Renewed | T2024-237 | |
| 203 | Transmission Line | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement: Sectioning of TL 230kV Floresta II-PauloAfonso III C2 at SS Zebu III. | dez-25 | 12.64 | 0 | 2 | 230 | 0 | 0 | AL | Yes | 03/01/30 | 31/12/42 | 2.09 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.01 | 0.23 | 061/2001 | Renewed | T2024-238 | |
| 204 | Transmission Line | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement: Re-conductoring of the 230 kV ITAPEBI / EUNÁPOLIS C-1 BA transmission line. | dez-25 | 49.06 | 26 | 0 | 230 | 0 | 0 | BA | Yes | 03/08/27 | 31/12/42 | 7.94 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.00 | 0.16 | 061/2001 | Renewed | T2024-242 | |
| 205 | Transmission Line | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement: Re-conductoring of the 230 kV ITAPEBI / EUNÁPOLIS C2 BA transmission line. | dez-25 | 49.06 | 26 | 0 | 230 | 0 | 0 | BA | Yes | 03/08/27 | 31/12/42 | 7.94 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.00 | 0.00 | 061/2001 | Renewed | T2024-243 | |
| 206 | Transmission Line | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement: Re-conductoring of the 230 kV SAPEAÇU - SANTO ANTÔNIO DE JESUS C-1 transmission line. | dez-25 | 34.45 | 27 | 0 | 230 | 0 | 0 | BA | Yes | 31/07/27 | 31/12/42 | 5.57 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.00 | 0.03 | 061/2001 | Renewed | T2025-001 | |
| 207 | Transmission Line | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement: Re-conductoring of the 230 kV SAPEAÇU - SANTO ANTÔNIO DE JESUS C-2 transmission line. | dez-25 | 34.45 | 0 | 0 | 230 | 0 | 0 | BA | Yes | 31/07/27 | 31/12/42 | 5.57 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.00 | 0.03 | 061/2001 | Renewed | T2025-002 | |
| 208 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement at Rondonópolis SE: Installation of the 3rd ATF 230/138 kV – 150 MVA (5th unit at the substation). | dez-25 | 34.55 | 6 | 0 | 230 | 150 | 0 | MT | Yes | 31/07/27 | 31/12/42 | 5.80 | jun-25 | IPCA | Reinforcement | 0.00 | 0.01 | 0.11 | 0.06 | 058/2001 | Renewed | T2025-004 | |
| 209 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement at Sinop SE: Installation of the 4th ATF 230/138 kV – 150 MVA. | dez-25 | 34.55 | 2 | 0 | 230 | 150 | 0 | MT | Yes | 31/07/27 | 31/12/42 | 5.80 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.03 | 0.14 | 058/2001 | Renewed | T2025-005 | |
| 210 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement at Nova Mutum SE: Installation of the 4th ATF 230/69 kV – 75 MVA. | dez-25 | 27.36 | 7 | 0 | 230 | 75 | 0 | MT | Yes | 20/07/27 | 31/12/42 | 4.58 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.02 | 0.46 | 058/2001 | Renewed | T2025-006 | |
| 211 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement at Nova Mutum SE: Replacement of TF1 230/69 kV. | dez-25 | 28.94 | 7 | 0 | 230 | 45 | 0 | MT | Yes | 20/07/27 | 31/12/42 | 4.86 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.07 | 0.24 | 058/2001 | Renewed | T2025-007 | |
| 212 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at Tijuco Preto Substation: Replacement of RESERVE Reactor 1 – RTIATP1/2/3 | dez-25 | 8.25 | 31 | 0 | 750 | 0 | 0 | SP | Yes | 20/01/28 | 31/12/42 | 1.34 | jun-25 | IPCA | Improvement | 0.01 | 0.00 | 0.02 | 1.99 | 062/2001 | Renewed | T2024-187 | |
| 213 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at Foz do Iguaçu Substation: Refurbishment of Converter Transformer 57844 | dez-25 | 45.23 | 0 | 0 | 600 | 0 | 0 | PR | Yes | 11/10/27 | 31/12/42 | 7.39 | jun-25 | IPCA | Improvement | 12.65 | 1.08 | 3.25 | 0.95 | 062/2001 | Renewed | T2025-018 | |
| 214 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at Foz do Iguaçu Substation: Refurbishment of Converter Transformer 7197219 | dez-25 | 41.32 | 30 | 0 | 600 | 0 | 0 | PR | Yes | 11/10/27 | 31/12/42 | 6.75 | jun-25 | IPCA | Improvement | 12.65 | 1.08 | 3.25 | 0.95 | 062/2001 | Renewed | T2025-019 | |
| 215 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at Ibiúna Substation: Refurbishment of Converter Transformer 57855 | dez-25 | 37.19 | 48 | 0 | 600 | 0 | 0 | SP | Yes | 11/04/27 | 31/12/42 | 6.06 | jun-25 | IPCA | Improvement | 12.99 | 2.59 | 3.44 | 5.27 | 062/2001 | Renewed | T2025-020 | |
| 216 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at Ibiúna Substation: Refurbishment of Converter Transformer 7197222 | dez-25 | 37.19 | 5 | 0 | 600 | 0 | 0 | SP | Yes | 11/04/27 | 31/12/42 | 6.06 | jun-25 | IPCA | Improvement | 12.99 | 2.59 | 3.44 | 5.27 | 062/2001 | Renewed | T2025-021 | |
| 217 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at Ibiúna Substation: Refurbishment of Converter Transformer 7476860 | dez-25 | 37.19 | 40 | 0 | 600 | 0 | 0 | SP | Yes | 11/04/27 | 31/12/42 | 6.06 | jun-25 | IPCA | Improvement | 12.99 | 2.59 | 3.44 | 5.27 | 062/2001 | Renewed | T2025-022 | |
| 218 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at Ibiúna Substation: Refurbishment of Converter Transformer 7197223 | dez-25 | 37.19 | 40 | 0 | 600 | 0 | 0 | SP | Yes | 11/10/27 | 31/12/42 | 6.07 | jun-25 | IPCA | Improvement | 12.99 | 2.59 | 3.44 | 5.27 | 062/2001 | Renewed | T2025-023 | |
| 219 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at Ibiúna Substation: Refurbishment of Converter Transformer 7197226 | dez-25 | 37.19 | 27 | 0 | 600 | 0 | 0 | SP | Yes | 11/10/28 | 31/12/42 | 5.87 | jun-25 | IPCA | Improvement | 12.99 | 2.59 | 3.44 | 5.27 | 062/2001 | Renewed | T2025-024 | |
| 220 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at Ibiúna Substation: Refurbishment of Converter Transformer 58778 | dez-25 | 37.19 | 27 | 0 | 600 | 0 | 0 | SP | Yes | 11/10/28 | 31/12/42 | 5.87 | jun-25 | IPCA | Improvement | 12.99 | 2.59 | 3.44 | 5.27 | 062/2001 | Renewed | T2025-025 | |
| 221 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Reinforcement at Poços de Caldas Substation: Installation of the 2nd 500/345 kV ATF, 3 × 200 MVA | dez-25 | 96.64 | 0 | 0 | 230 | 600 | 0 | MG | Yes | 22/10/27 | 31/12/42 | 16.10 | jun-25 | IPCA | Reinforcement | 0.00 | 0.02 | 0.07 | 8.56 | 062/2001 | Renewed | T2025-032 | |
| 222 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement at Mirueira 230/69 kV Substation: Replacement of Transformer 04TR3 (100 MVA) | dez-25 | 29.10 | 0 | 0 | 230 | 100 | 0 | PE | Yes | 22/10/27 | 31/12/42 | 5.00 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.05 | 0.16 | 061/2001 | Renewed | T2025-036 | |
| 223 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement at Mirueira 230/69 kV Substation: Replacement of Transformer 04TR4 (100 MVA) | dez-25 | 29.10 | 0 | 0 | 230 | 100 | 0 | PE | Yes | 22/10/27 | 31/12/42 | 5.00 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.05 | 0.16 | 061/2001 | Renewed | T2025-037 | |
| 224 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement at Sorriso Substation: Replacement of the 230/69 kV TF, T-01, 1 × 30 MVA with a 1 × 100 MVA unit | dez-25 | 26.20 | 10 | 0 | 230 | 70 | 0 | MT | Yes | 22/10/27 | 31/12/42 | 4.52 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.15 | 0.26 | 058/2001 | Renewed | T2025-041 | |
| 225 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement at Sorriso Substation: Installation of the 5th 230/69 kV TF, 1 × 100 MVA | dez-25 | 27.80 | 10 | 0 | 230 | 100 | 0 | MT | Yes | 22/10/27 | 31/12/42 | 4.80 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.00 | 0.31 | 058/2001 | Renewed | T2025-042 | |
| 226 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Reinforcement at Jacarepaguá Substation: Installation of the 1st three-phase bus reactor – 30 Mvar / 138 kV | dez-25 | 13.45 | 1 | 0 | 138 | 0 | 30 | RJ | Yes | 22/04/27 | 31/12/42 | 2.32 | jun-25 | IPCA | Reinforcement | 0.00 | 0.01 | 0.08 | 0.67 | 062/2001 | Renewed | T2025-045 | |
| 227 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement at Mirueira II Substation: Installation of the 3rd 230/69 kV TF, 1 × 150 MVA | dez-25 | 28.73 | 0 | 0 | 230 | 150 | 0 | PE | Yes | 22/10/27 | 01/06/42 | 4.02 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.09 | 0.20 | 017/2012 | Bidder | T2025-047 | |
| 228 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement at Lucas do Rio Verde Substation: Installation of the 3rd 230/138 kV ATF, 3 × 25 MVA | dez-25 | 37.24 | 10 | 0 | 230 | 75 | 0 | MT | Yes | 22/10/27 | 28/06/41 | 5.23 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.00 | 0.00 | 004/2011 | Bidder | T2025-050 | |
| 229 | Substation | AXIA Sul | AXIA Sul | 100% | Reinforcement at Siderópolis Substation: Installation of the 4th 230/69 kV TF – 150 MVA | dez-25 | 15.94 | 4 | 0 | 230 | 150 | 0 | SC | Yes | 20/12/28 | 31/12/42 | 2.69 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.08 | 0.07 | 057/2001 | Renewed | T2025-052 | |
| 230 | Transmission Line | AXIA Nordeste | AXIA Nordeste | 100% | Recondutoramento da LT 230 kV Recife II - Mirueira (04C4) | dez-25 | 23.74 | 0 | 0 | 230 | 0 | 0 | PE | No | 08/03/28 | 31/12/42 | 3.96 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.00 | 0.03 | 061/2001 | Renewed | T2025-059 | DSP 2677/2025 |
| 231 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement at Teresina Substation: Replacement of TR3 (100 MVA) with a three-phase unit (200 MVA) (New) | dez-25 | 29.26 | 2 | 0 | 230 | 100 | 0 | PI | No | 03/04/28 | 31/12/42 | 5.02 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.00 | 0.00 | 061/2001 | Renewed | T2025-060 | REA 16496/2025 |
| 232 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Reinforcement at Teresina Substation: Replacement of TR5 (100 MVA) with a three-phase unit (200 MVA) (New) | dez-25 | 29.26 | 2 | 0 | 230 | 100 | 0 | PI | No | 03/04/28 | 31/12/42 | 5.02 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.00 | 0.00 | 061/2001 | Renewed | T2025-061 | REA 16496/2025 |
| 233 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at Tijuco Preto Substation: Replacement of reserve reactor RTR 69 kV, 60 Mvar – Tijuco Preto RTR1 SP (New) | dez-25 | 0.70 | 6 | 0 | 69 | 0 | 0 | SP | No | 31/10/29 | 31/12/42 | 0.12 | jun-25 | IPCA | Improvement | 0.00 | 0.00 | 0.03 | 0.07 | 062/2001 | Renewed | T2025-063 | DSP 3182/2025 |
| 234 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at Bandeirantes Substation: Replacement of line reactor – RTIMBD2 (New) | dez-25 | 32.68 | 0 | 0 | 345 | 0 | 0 | GO | No | 02/12/28 | 31/12/42 | 5.37 | jun-25 | IPCA | Improvement | 0.00 | 0.00 | 0.00 | 0.00 | 062/2001 | Renewed | T2025-064 | REA 16574/2025 |
| 235 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at Serra da Mesa Substation: Replacement of reactor RTSMSB1 500 kV – 3 × 24.5 MVAr (New) | dez-25 | 39.13 | 0 | 0 | 500 | 0 | 0 | GO | No | 02/12/28 | 31/12/42 | 6.40 | jun-25 | IPCA | Improvement | 0.00 | 0.00 | 0.00 | 0.00 | 062/2001 | Renewed | T2025-065 | REA 16574/2025 |
| 236 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at Brasil Sul Substation: Replacement of grounding transformer TFAT – tertiary AT04 (New) | dez-25 | 0.21 | 0 | 0 | 14 | 0 | 0 | DF | No | 31/10/28 | 31/12/42 | 0.03 | jun-25 | IPCA | Improvement | 0.00 | 0.00 | 0.00 | 0.00 | 062/2001 | Renewed | T2025-066 | DSP 3182/2025 |
| 237 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at Marabá Substation (New) | dez-25 | 5.40 | 0 | 0 | 500 | 0 | 0 | PA | No | 30/04/29 | 31/12/42 | 0.89 | jun-25 | IPCA | Improvement | 0.00 | 0.04 | 0.02 | 0.01 | 058/2001 | Renewed | T2025-067 | DSP 3186/2025 |
| 238 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at Itutinga Substation: Replacement of reserve reactor RT8V1 (New) | dez-25 | 3.56 | 0 | 0 | 345 | 0 | 0 | MG | No | 31/10/28 | 31/12/42 | 0.58 | jun-25 | IPCA | Improvement | 0.00 | 0.00 | 0.06 | 0.11 | 062/2001 | Renewed | T2025-068 | DSP 3182/2025 |
| 239 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at Poços de Caldas Substation: Replacement of the Poços de Caldas – Itajubá transmission line reactor (New) | dez-25 | 16.10 | 0 | 0 | 500 | 0 | 0 | MG | No | 04/11/28 | 31/12/42 | 2.71 | jun-25 | IPCA | Improvement | 0.00 | 0.02 | 0.05 | 0.01 | 062/2001 | Renewed | T2025-069 | DSP 3241/2025 |
| 240 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at Poços de Caldas Substation: Replacement of the reserve reactor of the Poços de Caldas – Itajubá transmission line (New) | dez-25 | 5.37 | 0 | 0 | 500 | 0 | 0 | MG | No | 04/11/28 | 31/12/42 | 0.90 | jun-25 | IPCA | Improvement | 0.00 | 0.00 | 0.03 | 0.01 | 062/2001 | Renewed | T2025-070 | DSP 3241/2025 |
| 241 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Improvement at C. Paulista Substation: Replacement of reactor RT01, phases A and B (New) | dez-25 | 10.73 | 0 | 0 | 500 | 0 | 0 | SP | No | 04/11/30 | 31/12/42 | 1.84 | jun-25 | IPCA | Improvement | 0.09 | 1.53 | 3.08 | 4.17 | 062/2001 | Renewed | T2025-071 | DSP 3241/2025 |
| 242 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at Imperatriz Substation: Replacement of autotransformer IZAT7-01 (New) | dez-25 | 31.31 | 0 | 0 | 500 | 0 | 0 | MA | No | 02/12/28 | 31/12/42 | 5.21 | jun-25 | IPCA | Improvement | 0.00 | 0.00 | 0.00 | 0.00 | 058/2001 | Renewed | T2025-072 | REA 16577/2025 |
| 243 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at São Luís II Substation: Replacement of 230 kV capacitor bank – 50.8 MVAr – LDBC6-01 (New) | dez-25 | 2.76 | 1 | 0 | 230 | 0 | 0 | MA | No | 31/10/29 | 31/12/42 | 0.51 | jun-25 | IPCA | Improvement | 0.00 | 0.00 | 0.03 | 0.02 | 058/2001 | Renewed | T2025-073 | DSP 3186/2025 |
| 244 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at São Luís II Substation: Replacement of 230 kV capacitor bank – 61.5 MVAr – LDBC6-03 (New) | dez-25 | 2.80 | 2 | 0 | 230 | 0 | 0 | MA | No | 31/10/29 | 31/12/42 | 0.51 | jun-25 | IPCA | Improvement | 0.00 | 0.00 | 0.03 | 0.00 | 058/2001 | Renewed | T2025-074 | DSP 3186/2025 |
| 245 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at Utinga Substation: Replacement of 230 kV capacitor bank UGBC6-01 (New) | dez-25 | 2.91 | 0 | 0 | 230 | 0 | 0 | PA | No | 31/10/29 | 31/12/42 | 0.53 | jun-25 | IPCA | Improvement | 0.00 | 0.00 | 0.00 | 0.00 | 058/2001 | Renewed | T2025-075 | DSP 3186/2025 |
| 246 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at Utinga Substation: Replacement of 230 kV capacitor bank UGBC6-02 (New) | dez-25 | 2.91 | 0 | 0 | 230 | 0 | 0 | PA | No | 31/10/29 | 31/12/42 | 0.53 | jun-25 | IPCA | Improvement | 0.00 | 0.00 | 0.00 | 0.00 | 058/2001 | Renewed | T2025-076 | DSP 3186/2025 |
| 247 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at São Luís II Substation: Replacement of 230 kV capacitor bank – 61.1 MVAr – LDBC6-04 (New) | dez-25 | 2.80 | 2 | 0 | 230 | 0 | 0 | MA | No | 31/10/29 | 31/12/42 | 0.51 | jun-25 | IPCA | Improvement | 0.00 | 0.00 | 0.03 | 0.00 | 058/2001 | Renewed | T2025-077 | DSP 3186/2025 |
| 248 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at São Luís II Substation: Replacement of 230 kV capacitor bank – 61.1 MVAr – LDBC6-02 (New) | dez-25 | 2.85 | 2 | 0 | 230 | 0 | 0 | MA | No | 31/10/29 | 31/12/42 | 0.52 | jun-25 | IPCA | Improvement | 0.00 | 0.00 | 0.03 | 0.00 | 058/2001 | Renewed | T2025-078 | DSP 3186/2025 |
| 249 | Substation | AXIA Norte | AXIA Norte | 100% | Improvement at São Luís II Substation: Replacement of transformer LDAT7-02 (New) | dez-25 | 55.96 | 0 | 0 | 500 | 0 | 0 | MA | No | 02/12/28 | 31/12/42 | 9.29 | jun-25 | IPCA | Improvement | 0.00 | 0.00 | 0.00 | 0.00 | 058/2001 | Renewed | T2025-079 | REA 16577/2025 |
| 250 | Substation | AXIA Nordeste | AXIA Nordeste | 100% | Improvement at Camaçari II Substation: Replacement of one single-phase 230 kV transformer, rated power 100 MVA (New) | dez-25 | 11.82 | 0 | 0 | 230 | 0 | 0 | BA | No | 27/11/28 | 31/12/42 | 1.95 | jun-25 | IPCA | Improvement | 0.00 | 0.00 | 0.00 | 0.00 | 061/2001 | Renewed | T2025-081 | DSP 3490/2025 |
| 251 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement at Tucuruí Substation: Installation of the 3rd ATF 230/138/13.8 kV, 1 × 100 MVA (New) | dez-25 | 32.20 | 1 | 0 | 230 | 100 | 0 | PA | No | 26/05/28 | 09/12/41 | 4.52 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.00 | 0.00 | 012/2011 | Bidder | T2025-088 | DSP 3463/2025 |
| 252 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement at Presidente Dutra Substation: Installation of the 2nd ATF 500/230 kV, 3 × 150 MVA (New) | dez-25 | 45.64 | 0 | 0 | 500 | 450 | 0 | MA | No | 12/06/28 | 31/12/42 | 7.76 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.00 | 0.00 | 058/2001 | Renewed | T2025-090 | REA 16588/2025 |
| 253 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement at Boa Vista Substation: Replacement of BVTF602 with the 3rd ATF 230/69/13.8 kV, 1 × 150 MVA (New) | dez-25 | 23.08 | 1 | 0 | 230 | 50 | 0 | RR | No | 26/05/28 | 31/12/42 | 3.79 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.00 | 0.00 | 058/2001 | Renewed | T2025-091 | DSP 3463/2025 |
| 254 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement at Boa Vista Substation: Installation of the 4th ATF 230/69/13.8 kV, 1 × 150 MVA (New) | dez-25 | 30.88 | 1 | 0 | 230 | 150 | 0 | RR | No | 26/05/28 | 31/12/42 | 5.22 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.00 | 0.00 | 058/2001 | Renewed | T2025-092 | DSP 3463/2025 |
| 255 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement at Porto Velho Collector Substation: Replacement of TF-13 with the 1st ATF 500/230 kV (3 × 200 MVA) (New) | dez-25 | 82.15 | 0 | 0 | 500 | 135 | 0 | RO | No | 12/06/28 | 26/02/39 | 11.40 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.00 | 0.00 | 010/2009 | Bidder | T2025-093 | REA 16588/2025 |
| 256 | Substation | AXIA Norte | AXIA Norte | 100% | Reinforcement at Porto Velho Collector Substation: Spare phase of the 1st ATF 500/230 kV (1 × 200 MVA) (New) | dez-25 | 14.94 | 0 | 0 | 500 | 0 | 0 | RO | No | 12/06/28 | 26/02/39 | 2.06 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.00 | 0.00 | 010/2009 | Bidder | T2025-094 | REA 16588/2025 |
| 257 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Reinforcement at Poços de Caldas Substation: Installation of the 1st 345 kV bus reactor, 3 × 50 Mvar (New) | dez-25 | 26.35 | 0 | 0 | 345 | 0 | 150 | MG | No | 04/12/27 | 31/12/42 | 4.66 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.00 | 0.00 | 062/2001 | Renewed | T2025-099 | DSP 3561/2025 |
| 258 | Substation | AXIA Sudeste | AXIA Sudeste | 100% | Reinforcement at Poços de Caldas Substation: Installation of the 1st 345 kV bus reactor, (1R) × 50 Mvar (New) | dez-25 | 3.72 | 0 | 0 | 345 | 0 | 0 | MG | No | 04/12/27 | 31/12/42 | 0.66 | jun-25 | IPCA | Reinforcement | 0.00 | 0.00 | 0.00 | 0.00 | 062/2001 | Renewed | T2025-101 | DSP 3561/2025 |
| 259 | Substation | AXIA Nova Ponte | AXIA Sul | 100% | Nova Ponte 3 Substation: Synchronous Compensation 2 × (−200 / +300) Mvar, 500 kV | out-25 | 542.27 | 0 | 0 | 500 | 0 | -400/+600 | MG | No | 23/08/29 | 23/02/56 | 43.64 | jun-25 | IPCA | Expansion | NA | NA | NA | NA | 006/2026 | Bidder | 006/2026 | Auction 004/2025 – Lot 6A (Estimated concession end date, considering the expected contract signing date of February 23, 2026) |
| 260 | Substation | AXIA Paracatu | AXIA Sul | 100% | Paracatu 4 Substation: Synchronous Compensation 1 × (−200 / +300) Mvar, 500 kV | out-25 | 282.82 | 0 | 0 | 500 | 0 | -200/+300 | MG | No | 23/08/29 | 23/02/56 | 24.04 | jun-25 | IPCA | Expansion | NA | NA | NA | NA | 007/2026 | Bidder | 007/2026 | Auction 004/2025 – Lot 6A (Estimated concession end date, considering the expected contract signing date of February 23, 2026) |
| 261 | Substation | AXIA Carnaúba | AXIA Sul | 100% | Açu III Substation: Synchronous Compensation 2 × (−200 / +300) Mvar, 500 kV | out-25 | 536.46 | 0 | 0 | 500 | 0 | -400/+600 | RN | No | 23/08/29 | 23/02/56 | 48.80 | jun-25 | IPCA | Expansion | NA | NA | NA | NA | 008/2026 | Bidder | 008/2026 | Auction 004/2025 – Lot 6A (Estimated concession end date, considering the expected contract signing date of February 23, 2026) |
| 262 | Substation | AXIA Seridó | AXIA Sul | 100% | João Câmara III Substation: Synchronous Compensation 1 × (−200 / +300) Mvar, 500 kV | out-25 | 268.55 | 0 | 0 | 500 | 0 | -200/+300 | RN | No | 23/08/29 | 23/02/56 | 24.00 | jun-25 | IPCA | Expansion | NA | NA | NA | NA | 009/2026 | Bidder | 009/2026 | Auction 004/2025 – Lot 6A (Estimated concession end date, considering the expected contract signing date of February 23, 2026) |
| Note: | ||||||||||||||||||||||||||||
| (1) Project – Control code of the projects, as per the “Project” column in the worksheet tab “Dados RAP ReH 3348_2024.” | ||||||||||||||||||||||||||||
| (2) With respect to the information related to Auction 004/2025, as the concession agreements have not yet been executed, the concession end dates are estimated, based on the expected contract signing date of February 23, 2026, as provided for in the auction notice. | ||||||||||||||||||||||||||||
| Source: | RAP Current | List of Modules |
| RAP total ReH 3481/2025 | 18,431,032,292 | 18,431,032,292 |
| Active Modules on ReH 3,348 | 16,537,870,631 | 16,537,870,631 |
| Additional RAP on 3Q25 | 106,376,773 | 106,376,773 |
| Additional RAP on 4Q25 | 89,163,363 | 89,163,363 |
| Planned Modules | 1,697,621,526 | 1,697,621,526 |
| Considered in SIGET | 885,326,023 | 885,326,023 |
| Others | 812,295,503 | 812,295,503 |
| Revenue Concessionaire | Edification | Module | Classification | Transmission Function | Revenue Contract | Index | Revenue Type | RAP Act | Start | End | 2025/2026 RAP Cycle | RAP Reference Date | RAP Situation | Project | Revenue Description | Quarter | Obs |
| AXIA Energia Nordeste | ABAIARA | MG 230 kV ABAIARA MG1 CE | RB | FT MG 230 kV ABAIARA MG1 CE | 061/2001 | IPCA | RBNI | DSP 872/2024 | 12/7/2023 | 12/6/2051 | R$69,925.62 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura Geral de Acessante -MIG-A 230 kV na SE Abaiara, em função do seccionamento da LT 230 kV Bom Nome - Milagres C2. | |||
| AXIA Energia Nordeste | ABAIARA | MG 230 kV ABAIARA MG1 CE | RB | FT MG 230 kV ABAIARA MG1 CE | 061/2001 | IPCA | RBNI | DSP 872/2024 | 12/7/2023 | 12/6/2054 | R$22,315.36 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 230 kV na SE Abaiara, associada à Entrada da Linha de Transmissão 230 kV Bom Nome – Abaiara C1. | |||
| AXIA Energia Nordeste | ABAIARA | MG 230 kV ABAIARA MG1 CE | RB | FT MG 230 kV ABAIARA MG1 CE | 061/2001 | IPCA | RBNI | DSP 872/2024 | 12/7/2023 | 12/6/2054 | R$22,315.36 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 230 kV na SE Abaiara, associada à Entrada da Linha de Transmissão 230 kV Abaiara – Milagres C1. | |||
| AXIA Energia Nordeste | ABAIARA | EL 230 kV ABAIARA LT 230 kV BOM NOME /ABAIARA C-1 PE/CE | RB | FT LT 230 kV BOM NOME /ABAIARA C-1 PE/CE | 061/2001 | IPCA | RBNI | DSP 872/2024 | 12/7/2023 | 12/6/2051 | R$204,786.37 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo Barra Dupla a Quatro Chaves, na subestação Abaiara, associada à Linha de Transmissão 230 kV Bom Nome – Abaiara C1. | |||
| Nova Era Integração | ABAIARA | EL 230 kV ABAIARA LT 230 kV ABAIARA /MILAGRES C-2 CE | RB | FT LT 230 kV ABAIARA /MILAGRES C-2 CE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,721,308.40 | 6/1/2025 | Prevista | T2024-197-C | LT 230 kV Abaiara - Milagres - C2Seccionamento da LT 230 kV Milagres – Crato II – C1 na subestação Abaiara. | ||||
| AXIA Energia Nordeste | ABAIARA | EL 230 kV ABAIARA LT 230 kV ABAIARA /MILAGRES C-1 CE | RB | FT LT 230 kV ABAIARA /MILAGRES C-1 CE | 061/2001 | IPCA | RBNI | DSP 872/2024 | 12/7/2023 | 12/6/2051 | R$204,786.37 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo Barra Dupla a Quatro Chaves, na subestação Abaiara, associada à Linha de Transmissão 230 kV Abaiara – Milagres C1. | |||
| Nova Era Integração | ABAIARA | EL 230 kV ABAIARA LT 230 kV ABAIARA /CRATO II C-1 CE | RB | FT LT 230 kV ABAIARA /CRATO II C-1 CE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,100,241.23 | 6/1/2025 | Prevista | T2024-197-C | LT 230 kV Abaiara - Milagres - C2Seccionamento da LT 230 kV Milagres – Crato II – C1 na subestação Abaiara. | ||||
| AXIA Energia Nordeste | ABAIXADORA | TT 69/13,8 kV ABAIXADORA TA1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ABAIXADORA | TT 69/13,8 kV ABAIXADORA TA1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$248,222.69 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ABAIXADORA | TR 69/69 kV ABAIXADORA TREG1 BA | RBF | FT TR 230/69 kV ABAIXADORA TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$166,073.82 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ABAIXADORA | TR 69/13,8 kV ABAIXADORA TR6 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ABAIXADORA | TR 69/13,8 kV ABAIXADORA TR3 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ABAIXADORA | TR 230/69 kV ABAIXADORA TRR2 BA | RBF | FT TR 230/69 kV ABAIXADORA TRR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$183,593.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ABAIXADORA | TR 230/69 kV ABAIXADORA TRR1 BA | RBF | FT TR 230/69 kV ABAIXADORA TRR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$183,593.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ABAIXADORA | TR 230/69 kV ABAIXADORA TR2 BA | RBF | FT TR 230/69 kV ABAIXADORA TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ABAIXADORA | TR 230/69 kV ABAIXADORA TR2 BA | RBF | FT TR 230/69 kV ABAIXADORA TR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ABAIXADORA | TR 230/69 kV ABAIXADORA TR2 BA | RBF | FT TR 230/69 kV ABAIXADORA TR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$913,997.96 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ABAIXADORA | MG 230 kV ABAIXADORA MG1 BA | RB | FT MG 230 kV ABAIXADORA MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$436,850.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ABAIXADORA | MG 230 kV ABAIXADORA MG1 BA | RB | FT MG 230 kV ABAIXADORA MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/9/2015 | 11/8/2032 | R$17,417.28 | 6/1/2025 | Ativa | Revitalização Necessária: SUBSTITUIÇÃO DAS BATERIAS SATURNIA 6OPZS400 125VCC, 800A1 E 800A2.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ABAIXADORA | MG 230 kV ABAIXADORA MG1 BA | RB | FT MG 230 kV ABAIXADORA MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,225,875.01 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ABAIXADORA | MG 230 kV ABAIXADORA MG1 BA | RB | FT MG 230 kV ABAIXADORA MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,130,106.98 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ABAIXADORA | MG 230 kV ABAIXADORA MG1 BA | RB | FT MG 230 kV ABAIXADORA MG1 BA | 061/2001 | IPCA | RBNI | DSP 386/2021 | 12/2/2021 | 12/1/2049 | R$297,123.73 | 6/1/2025 | Ativa | Instalação de UTR (composto por uma Unidade Remota de Comandos, GPS e cabos de controle) em substituição à existente. Reconfiguração em bases da UTR, SAGE e relés auxiliares e adequações na fiação e cabeação dos painéis de proteção e controle. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ABAIXADORA | MG 230 kV ABAIXADORA MG1 BA | RB | FT MG 230 kV ABAIXADORA MG1 BA | 061/2001 | IPCA | RBNI | REA 2376/2010 | 2/9/2023 | 2/8/2054 | R$51,399.30 | 6/1/2025 | Ativa | MIM ASSOCIADO: Instalação de EL 69 kV para a conexão da LT Paulo Afonso II - Zebú, atualmente operando em 138 kV. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2023 - 2024 | |||
| AXIA Energia Nordeste | ABAIXADORA | MG 230 kV ABAIXADORA MG1 BA | RB | FT MG 230 kV ABAIXADORA MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/8/2022 | 10/9/2049 | R$27,415.90 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ABAIXADORA | MC 69 kV TT 69/13,8 kV ABAIXADORA TA1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ABAIXADORA | MC 69 kV TR 69/13,8 kV ABAIXADORA TR6 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ABAIXADORA | MC 69 kV TR 69/13,8 kV ABAIXADORA TR6 BA | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 7/26/2016 | 7/29/2046 | R$6,630.60 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ABAIXADORA | MC 69 kV TR 69/13,8 kV ABAIXADORA TR6 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/1/2021 | 1/31/2049 | R$9,164.65 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | ABAIXADORA | MC 69 kV TR 69/13,8 kV ABAIXADORA TR3 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ABAIXADORA | MC 69 kV TR 69/13,8 kV ABAIXADORA TR3 BA | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 7/26/2016 | 7/29/2046 | R$6,630.60 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ABAIXADORA | MC 69 kV TR 230/69 kV ABAIXADORA TR2 BA | RBF | FT TR 230/69 kV ABAIXADORA TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ABAIXADORA | MC 69 kV TR 230/69 kV ABAIXADORA TR2 BA | RBF | FT TR 230/69 kV ABAIXADORA TR2 BA | 061/2001 | IPCA | RBNI | REA 2040/2009 | 3/24/2013 | 3/23/2046 | R$58,557.89 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 69 kV associadas a conexão do transformador (CT) 12T2. Incluído no reajuste ciclo 2014-2015. RAP ativada no ciclo 2016-2017 após Recurso em face da REH nº 2.098/2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ABAIXADORA | MC 69 kV TR 230/69 kV ABAIXADORA TR2 BA | RBF | FT TR 230/69 kV ABAIXADORA TR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ABAIXADORA | MC 69 kV TR 230/69 kV ABAIXADORA TR2 BA | RBF | FT TR 230/69 kV ABAIXADORA TR2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/15/2021 | 5/14/2045 | R$15,675.31 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ABAIXADORA | MC 230 kV TR 230/69 kV ABAIXADORA TR2 BA | RBF | FT TR 230/69 kV ABAIXADORA TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$104,167.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ABAIXADORA | MC 230 kV TR 230/69 kV ABAIXADORA TR2 BA | RBF | FT TR 230/69 kV ABAIXADORA TR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$292,312.83 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ABAIXADORA | MC 230 kV TR 230/69 kV ABAIXADORA TR2 BA | RBF | FT TR 230/69 kV ABAIXADORA TR2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/1/2021 | 12/19/2045 | R$29,470.04 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ABAIXADORA | MC 13,8 kV TR 69/13,8 kV ABAIXADORA TR6 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ABAIXADORA | MC 13,8 kV TR 69/13,8 kV ABAIXADORA TR3 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ABAIXADORA | IB 69 kV MG 230 kV ABAIXADORA MG1 BA IB2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ABAIXADORA | IB 230 kV MG 230 kV ABAIXADORA MG1 BA IB1 | RB | FT MG 230 kV ABAIXADORA MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,837.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ABAIXADORA | IB 230 kV MG 230 kV ABAIXADORA MG1 BA IB1 | RB | FT MG 230 kV ABAIXADORA MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/14/2021 | 5/17/2051 | R$64,789.69 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ABAIXADORA | EL 69 kV ABAIXADORA LT 69 kV ABAIXADORA /ZEBU II C-1 BA/AL | DIT | 061/2001 | IPCA | RCDM | REA 2376/2010 | 2/9/2023 | 2/8/2051 | R$704,635.75 | 6/1/2025 | Ativa | Instalação de EL 69 kV para a conexão da LT Paulo Afonso II - Zebú, atualmente operando em 138 kV. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2023 - 2024 | ||||
| AXIA Energia Nordeste | ABAIXADORA | EL 69 kV ABAIXADORA LT 69 kV ABAIXADORA /MULUNGU C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ABAIXADORA | EL 69 kV ABAIXADORA LT 69 kV ABAIXADORA /MULUNGU C-1 BA | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 7/26/2016 | 7/29/2046 | R$8,840.80 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ABAIXADORA | EL 69 kV ABAIXADORA LT 69 kV ABAIXADORA /MULUNGU C-1 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/3/2020 | 3/2/2044 | R$7,518.70 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | ABAIXADORA | EL 69 kV ABAIXADORA LT 69 kV ABAIXADORA /MOXOTO C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ABAIXADORA | EL 69 kV ABAIXADORA LT 69 kV ABAIXADORA /MOXOTO C-1 BA | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 7/26/2016 | 7/29/2046 | R$8,840.80 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ABAIXADORA | EL 69 kV ABAIXADORA LT 69 kV ABAIXADORA /MOXOTO C-1 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/25/2022 | 3/24/2046 | R$8,066.72 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | ABAIXADORA | EL 69 kV ABAIXADORA DELMIRO GOUVEIA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ABAIXADORA | EL 69 kV ABAIXADORA DELMIRO GOUVEIA | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 7/26/2016 | 7/29/2046 | R$4,420.39 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ABAIXADORA | EL 69 kV ABAIXADORA DELMIRO GOUVEIA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/16/2022 | 4/15/2046 | R$8,082.78 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | ABDON BATISTA | EL 500 kV ABDON BATISTA LT 500 kV BIGUACU /ABDON BATISTA C-1 SC | RB | FT LT 500 kV BIGUACU /ABDON BATISTA C-1 SC | 010/2005 | IGPM | RBNI | REA 5904/2016 | 1/22/2016 | 3/3/2035 | R$456,223.70 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 525 kV, arranjo disjuntor e meio, na subestação Abdon Batista, associada à linha de transmissão 525 kV Campos Novos - Abdon Batista. *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Sul | ABDON BATISTA | EL 500 kV ABDON BATISTA LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC | RB | FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC | 010/2005 | IGPM | RBNI | REA 5904/2016 | 1/22/2016 | 3/3/2035 | R$456,223.70 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 525 kV, arranjo disjuntor e meio, na subestação Abdon Batista, associada à linha de transmissão 525 kV Campos Novos - Abdon Batista. *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Norte | ABUNA | TR 230/138 kV ABUNA TR2 RO | RBF | FT TR 230/138 kV ABUNA TR2 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$327,149.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ABUNA | TR 230/138 kV ABUNA TR1 RO | RBF | FT TR 230/138 kV ABUNA TR1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$327,149.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ABUNA | TR 230/138 kV ABUNA TR1 RO | RBF | FT TR 230/138 kV ABUNA TR1 RO | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 6/30/2016 | 6/29/2031 | R$36,663.27 | 6/1/2025 | Ativa | Implantacao de sistema de medicao e monitoramento online de Buchas Condensivas do equipamento ANAT601 para integrar ao SISTEMA DE SUPERVISAO SAGE Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | ABUNA | RTN 69 kV 0 Mvar ABUNA RN2 RO | RB | FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$16,446.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ABUNA | RTL 230 kV 30 Mvar ABUNA RT5 RO | RB | FT LT 230 kV ABUNA /TUCUMA C-1 RO/AC | 022/2009 | IPCA | RBL | CC 022/2009 | 10/27/2011 | 11/19/2039 | R$750,962.22 | 6/1/2025 | Ativa | Contrato de Concessão nº 022/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no Ciclo 2020-2021. * Receita revisada em 11-06-2025 | |||
| AXIA Energia Norte | ABUNA | RTL 230 kV 30 Mvar ABUNA RT3 RO | RB | FT LT 230 kV ABUNA /PORTO VELHO C-2 RO | 022/2009 | IPCA | RBL | CC 022/2009 | 10/27/2011 | 11/19/2039 | R$750,962.22 | 6/1/2025 | Ativa | Contrato de Concessão nº 022/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no Ciclo 2020-2021. * Receita revisada em 11-06-2025 | |||
| AXIA Energia Norte | ABUNA | RTL 230 kV 30 Mvar ABUNA RT2 RO | RB | FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$274,857.33 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ABUNA | RTL 230 kV 30 Mvar ABUNA RT2 RO | RB | FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 6/30/2016 | 6/29/2031 | R$23,331.17 | 6/1/2025 | Ativa | Implantacao de sistema de medicao e monitoramento online de Buchas Condensivas do equipamento ANRE602 para integrar ao SISTEMA DE SUPERVISAO SAGE Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | ABUNA | RTL 230 kV 30 Mvar ABUNA RT1 RO | RB | FT LT 230 kV ABUNA /PORTO VELHO C-1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$274,857.33 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ABUNA | RTL 230 kV 30 Mvar ABUNA RT1 RO | RB | FT LT 230 kV ABUNA /PORTO VELHO C-1 RO | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 6/30/2016 | 6/29/2031 | R$23,331.17 | 6/1/2025 | Ativa | Implantacao de sistema de medicao e monitoramento online de Buchas Condensivas do equipamento ANRE601 para integrar ao SISTEMA DE SUPERVISAO SAGE Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | ABUNA | RTL 230 kV 30 Mvar ABUNA RLR RO | RB | FT RTL 230 kV 30 Mvar ABUNA RLR RO | 058/2001 | IPCA | RBNI | REA 5679/2016 | 12/18/2017 | 3/4/2053 | R$807,978.00 | 6/1/2025 | Ativa | T2015-058 | Instalação de reator trifásico em 230 kV e 30 Mvar como reserva fria do reator de linha. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ABUNA | RTB 230 kV 30 Mvar ABUNA RT4 RO | RB | FT RTB 230 kV 30 Mvar ABUNA RT4 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$274,857.33 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ABUNA | MG 230 kV ABUNA MG1 RO | RB | FT MG 230 kV ABUNA MG1 RO | 058/2001 | IPCA | RBNI | REA 3216/2011 | 1/12/2014 | 8/18/2042 | R$136,914.18 | 6/1/2025 | Ativa | T2011-137 | Instalação, na SE Abunã, de um barramento de transferência 230 kV. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ABUNA | MG 230 kV ABUNA MG1 RO | RB | FT MG 230 kV ABUNA MG1 RO | 058/2001 | IPCA | RBNI | REA 3216/2011 | 1/12/2014 | 8/18/2042 | R$65,147.77 | 6/1/2025 | Ativa | T2011-137 | Instalação, na SE Abunã, um barramento de transferência 138 kV. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ABUNA | MG 230 kV ABUNA MG1 RO | RB | FT MG 230 kV ABUNA MG1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$514,589.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ABUNA | MG 230 kV ABUNA MG1 RO | RB | FT MG 230 kV ABUNA MG1 RO | 058/2001 | IPCA | RBNI | REA 5679/2016 | 12/18/2017 | 11/26/2048 | R$81,260.19 | 6/1/2025 | Ativa | T2015-058 | Complemento de módulo de infraestrutura de manobra - MIM em 230 kV associado à instalação de Reator Trifásico 30 Mvar em 230 kV - reserva fria de reator de linha. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ABUNA | MG 230 kV ABUNA MG1 RO | RB | FT MG 230 kV ABUNA MG1 RO | 058/2001 | IPCA | RMEL | REN 443/2011 | 9/1/2016 | 8/31/2033 | R$22,325.56 | 6/1/2025 | Ativa | MODERNIZAÇÃO DOS SERVIÇOS AUXILIARES CA E CC DAS SUBESTAÇÕES DO SISTEMA RONDONIA: CONTEMPLA SUBSTITUIÇÃO DE QUADROS, RETIFICADORES E BANCO DE BATERIAS. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | ABUNA | MG 230 kV ABUNA MG1 RO | RB | FT MG 230 kV ABUNA MG1 RO | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 12/17/2012 | 12/16/2040 | R$16,650.76 | 6/1/2025 | Ativa | 01 GPS E 02 RDPS DE 8 CANAIS ANALOGICOS E 32 DIGITAIS PROVIDO DE AQUISICAO DE FALTA POR ONDAS VIAJANTES PARA AS LINHAS LT PVAN E LT ANRB Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | ABUNA | MG 230 kV ABUNA MG1 RO | RB | FT MG 230 kV ABUNA MG1 RO | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 8/20/2021 | 2/17/2057 | R$30,787.06 | 6/1/2025 | Ativa | MODERNIZAÇÃO -Modulo de interface BM-HMI - ANRE601 BM Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | ABUNA | MC 230 kV TR 230/138 kV ABUNA TR2 RO | RBF | FT TR 230/138 kV ABUNA TR2 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$174,444.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ABUNA | MC 230 kV TR 230/138 kV ABUNA TR1 RO | RBF | FT TR 230/138 kV ABUNA TR1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$174,444.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ABUNA | MC 230 kV RTL 230 kV 30 Mvar ABUNA RT5 RO | RB | FT LT 230 kV ABUNA /TUCUMA C-1 RO/AC | 022/2009 | IPCA | RBL | CC 022/2009 | 10/27/2011 | 11/19/2039 | R$247,066.02 | 6/1/2025 | Ativa | Contrato de Concessão nº 022/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no Ciclo 2020-2021. * Receita revisada em 11-06-2025 | |||
| AXIA Energia Norte | ABUNA | MC 230 kV RTL 230 kV 30 Mvar ABUNA RT3 RO | RB | FT LT 230 kV ABUNA /PORTO VELHO C-2 RO | 022/2009 | IPCA | RBL | CC 022/2009 | 10/27/2011 | 11/19/2039 | R$247,066.02 | 6/1/2025 | Ativa | Contrato de Concessão nº 022/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no Ciclo 2020-2021. * Receita revisada em 11-06-2025 | |||
| AXIA Energia Norte | ABUNA | MC 230 kV RTL 230 kV 30 Mvar ABUNA RT2 RO | RB | FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$109,485.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ABUNA | MC 230 kV RTL 230 kV 30 Mvar ABUNA RT1 RO | RB | FT LT 230 kV ABUNA /PORTO VELHO C-1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$109,485.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ABUNA | MC 230 kV RTB 230 kV 30 Mvar ABUNA RT4 RO | RB | FT RTB 230 kV 30 Mvar ABUNA RT4 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$149,465.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ABUNA | MC 138 kV TR 230/138 kV ABUNA TR2 RO | RBF | FT TR 230/138 kV ABUNA TR2 RO | 058/2001 | IPCA | RBNI | REA 3216/2011 | 1/12/2014 | 4/6/2045 | R$541,191.16 | 6/1/2025 | Ativa | T2011-137 | Adequação do módulo de conexão 138 kV do transformador ATR2 230/138 kV - 55 MVA ao arranjo barra principal e transferência. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ABUNA | MC 138 kV TR 230/138 kV ABUNA TR2 RO | RBF | FT TR 230/138 kV ABUNA TR2 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,943.07 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ABUNA | MC 138 kV TR 230/138 kV ABUNA TR1 RO | RBF | FT TR 230/138 kV ABUNA TR1 RO | 058/2001 | IPCA | RBNI | REA 3216/2011 | 1/12/2014 | 4/27/2045 | R$541,265.01 | 6/1/2025 | Ativa | T2011-137 | Adequação do módulo de conexão 138 kV do transformador ATR1 200/138 kV - 55 MVA ao arranjo barra principal e transferência. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ABUNA | MC 138 kV TR 230/138 kV ABUNA TR1 RO | RBF | FT TR 230/138 kV ABUNA TR1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$122,666.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ABUNA | IB 230 kV MG 230 kV ABUNA MG1 RO IB1 | RB | FT MG 230 kV ABUNA MG1 RO | 058/2001 | IPCA | RBNI | REA 3216/2011 | 1/12/2014 | 10/17/2043 | R$704,813.09 | 6/1/2025 | Ativa | T2011-137 | Instalar, na SE Abunã, um módulo de interligação de barras 230 kV, arranjo barra principal e transferência, *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ABUNA | IB 138 kV MG 230 kV ABUNA MG1 RO IB1 | DIT | 058/2001 | IPCA | RCDM | REA 3216/2011 | 1/12/2014 | 6/25/2045 | R$547,104.96 | 6/1/2025 | Ativa | T2011-137 | Instalar, na SE Abunã, um módulo de interligação de barras 138 kV, arranjo barra principal e transferência, *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | ABUNA | EL 230 kV ABUNA LT 230 kV ABUNA /TUCUMA C-1 RO/AC | RB | FT LT 230 kV ABUNA /TUCUMA C-1 RO/AC | 022/2009 | IPCA | RBL | CC 022/2009 | 10/27/2011 | 11/19/2039 | R$753,979.47 | 6/1/2025 | Ativa | Contrato de Concessão nº 022/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no Ciclo 2020-2021. * Receita revisada em 11-06-2025 | |||
| AXIA Energia Norte | ABUNA | EL 230 kV ABUNA LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC | RB | FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$244,547.60 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ABUNA | EL 230 kV ABUNA LT 230 kV ABUNA /PORTO VELHO C-2 RO | RB | FT LT 230 kV ABUNA /PORTO VELHO C-2 RO | 022/2009 | IPCA | RBL | CC 022/2009 | 10/27/2011 | 11/19/2039 | R$753,979.47 | 6/1/2025 | Ativa | Contrato de Concessão nº 022/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no Ciclo 2020-2021. * Receita revisada em 11-06-2025 | |||
| AXIA Energia Norte | ABUNA | EL 230 kV ABUNA LT 230 kV ABUNA /PORTO VELHO C-1 RO | RB | FT LT 230 kV ABUNA /PORTO VELHO C-1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$244,547.60 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACARAU II | TT 69/0 kV ACARAU II TT1 CE | ICG | 021/2010 | IPCA | RICG | CC 021/2010 | 11/23/2010 | 6/30/2032 | R$104,464.92 | 6/1/2025 | Ativa | T2010-092 | Contrato de Concessão nº 021/2010RPEC - ICG *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | |||
| AXIA Energia Nordeste | ACARAU II | TR 230/69 kV ACARAU II TR2 CE | ICG | 021/2010 | IPCA | RICG | CC 021/2010 | 11/23/2010 | 6/30/2032 | R$ 1,196,659.63 | 6/1/2025 | Ativa | T2010-092 | Contrato de Concessão nº 021/2010RPEC - ICG *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | |||
| AXIA Energia Nordeste | ACARAU II | TR 230/69 kV ACARAU II TR1 CE | ICG | 021/2010 | IPCA | RICG | CC 021/2010 | 11/23/2010 | 6/30/2032 | R$ 1,196,659.63 | 6/1/2025 | Ativa | T2010-092 | Contrato de Concessão nº 021/2010RPEC - ICG *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | |||
| AXIA Energia Nordeste | ACARAU II | RTB 230 kV 22,14 Mvar ACARAU II RT1 CE | RB | FT RTB 230 kV 22,14 Mvar ACARAU II RT1 CE | 021/2010 | IPCA | RBL | CC 021/2010 | 4/8/2014 | 11/23/2040 | R$544,534.64 | 6/1/2025 | Ativa | T2010-092 | Contrato de Concessão nº 021/2010RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Nordeste | ACARAU II | MG 230 kV ACARAU II MG1 CE | RB | FT MG 230 kV ACARAU II MG1 CE | 021/2010 | IPCA | RBL | CC 021/2010 | 4/8/2014 | 11/23/2040 | R$810,771.42 | 6/1/2025 | Ativa | T2010-092 | Contrato de Concessão nº 021/2010RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Nordeste | ACARAU II | MG 230 kV ACARAU II MG1 CE | RB | FT MG 230 kV ACARAU II MG1 CE | 021/2010 | IPCA | RBNI | REN 905/2020 | 10/16/2020 | 10/15/2051 | R$37,056.04 | 6/1/2025 | Ativa | MIM associado a um módulo de Entrada de Linha em 69 kV com destino à Acaraú I. 01 EL 69 kV Acaraú I C1 (LT-02C1-AUD/ACA -Acarau I C1) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 | |||
| AXIA Energia Nordeste | ACARAU II | MG 230 kV ACARAU II MG1 CE | RB | FT MG 230 kV ACARAU II MG1 CE | 021/2010 | IPCA | RBNI | REN 905/2020 | 10/16/2020 | 10/15/2051 | R$37,056.04 | 6/1/2025 | Ativa | MIM associado a um módulo de Entrada de Linha em 69 kV com destino à Marco. 01 EL 69 kV Marco C1 (LT-02S4-AUD/Marco -Marco C1) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 | |||
| AXIA Energia Nordeste | ACARAU II | MC 69 kV TT 69/0 kV ACARAU II TT1 CE | ICG | 021/2010 | IPCA | RICG | CC 021/2010 | 11/23/2010 | 6/30/2032 | R$80,797.75 | 6/1/2025 | Ativa | T2010-092 | Contrato de Concessão nº 021/2010RPEC - ICG *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | |||
| AXIA Energia Nordeste | ACARAU II | MC 69 kV TR 230/69 kV ACARAU II TR2 CE | ICG | 021/2010 | IPCA | RICG | CC 021/2010 | 11/23/2010 | 6/30/2032 | R$189,440.61 | 6/1/2025 | Ativa | T2010-092 | Contrato de Concessão nº 021/2010RPEC - ICG *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | |||
| AXIA Energia Nordeste | ACARAU II | MC 69 kV TR 230/69 kV ACARAU II TR1 CE | ICG | 021/2010 | IPCA | RICG | CC 021/2010 | 11/23/2010 | 6/30/2032 | R$189,440.61 | 6/1/2025 | Ativa | T2010-092 | Contrato de Concessão nº 021/2010RPEC - ICG *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | |||
| AXIA Energia Nordeste | ACARAU II | MC 230 kV TR 230/69 kV ACARAU II TR2 CE | ICG | 021/2010 | IPCA | RICG | CC 021/2010 | 11/23/2010 | 6/30/2032 | R$465,611.60 | 6/1/2025 | Ativa | T2010-092 | Contrato de Concessão nº 021/2010RPEC - ICG *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | |||
| AXIA Energia Nordeste | ACARAU II | MC 230 kV TR 230/69 kV ACARAU II TR1 CE | ICG | 021/2010 | IPCA | RICG | CC 021/2010 | 11/23/2010 | 6/30/2032 | R$465,611.60 | 6/1/2025 | Ativa | T2010-092 | Contrato de Concessão nº 021/2010RPEC - ICG *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | |||
| AXIA Energia Nordeste | ACARAU II | MC 230 kV RTB 230 kV 22,14 Mvar ACARAU II RT1 CE | RB | FT RTB 230 kV 22,14 Mvar ACARAU II RT1 CE | 021/2010 | IPCA | RBL | CC 021/2010 | 4/8/2014 | 11/23/2040 | R$366,799.92 | 6/1/2025 | Ativa | T2010-092 | Contrato de Concessão nº 021/2010RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Nordeste | ACARAU II | IB 69 kV MG 230 kV ACARAU II MG1 CE IB1 | ICG | 021/2010 | IPCA | RICG | CC 021/2010 | 11/23/2010 | 6/30/2032 | R$129,176.00 | 6/1/2025 | Ativa | T2010-092 | Contrato de Concessão nº 021/2010RPEC - ICG *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | |||
| AXIA Energia Nordeste | ACARAU II | EL 69 kV ACARAU II DIST02 | DIT | 021/2010 | IPCA | RCDM | REN 905/2020 | 10/16/2020 | 10/15/2047 | R$384,146.87 | 6/1/2025 | Ativa | Um módulo de Entrada de Linha em 69 kV com destino à Marco. 01 EL 69 kV Marco C1 (LT-02S4-AUD/Marco -Marco C1) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 | ||||
| AXIA Energia Nordeste | ACARAU II | EL 69 kV ACARAU II DIST01 | DIT | 021/2010 | IPCA | RCDM | REN 905/2020 | 10/16/2020 | 10/15/2047 | R$384,146.87 | 6/1/2025 | Ativa | Um módulo de Entrada de Linha em 69 kV com destino à Acaraú I. 01 EL 69 kV Acaraú I C1 (LT-02C1-AUD/ACA -Acarau I C1) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 | ||||
| AXIA Energia Nordeste | ACARAU II | EL 230 kV ACARAU II LT 230 kV SOBRAL III /ACARAU II C-1 CE | RB | FT LT 230 kV SOBRAL III /ACARAU II C-1 CE | 021/2010 | IPCA | RBL | CC 021/2010 | 4/8/2014 | 11/23/2040 | R$535,357.49 | 6/1/2025 | Ativa | T2010-092 | Contrato de Concessão nº 021/2010RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Nordeste | ACU II | TT 69/13,8 kV ACU II TA1 RN | DIT | 061/2001 | IPCA | RCDM | REA 3578/2012 | 10/11/2015 | 6/8/2046 | R$181,289.48 | 6/1/2025 | Ativa | Obra de Substituição Completa - Substituição de 1 transformador de aterramento: 02A1. (Potência: 7,5 MVA) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ACU II | TR 230/69 kV ACU II TR7 RN | RBF | FT TR 230/69 kV ACU II TR7 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$247,202.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | TR 230/69 kV ACU II TR6 RN | RBF | FT TR 230/69 kV ACU II TR6 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$247,202.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | TR 230/69 kV ACU II TR6 RN | RBF | FT TR 230/69 kV ACU II TR6 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$693,691.80 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | TR 230/69 kV ACU II TR6 RN | RBF | FT TR 230/69 kV ACU II TR6 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$639,499.08 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | TR 230/69 kV ACU II TR5 RN | RBF | FT TR 230/69 kV ACU II TR5 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$209,167.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | TR 230/69 kV ACU II TR4 RN | RBF | FT TR 230/69 kV ACU II TR4 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$209,167.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | TR 230/69 kV ACU II TR4 RN | RBF | FT TR 230/69 kV ACU II TR4 RN | 061/2001 | IPCA | RBNIA | DSP 4277/2023 | R$ 2,190,331.65 | 6/1/2025 | Prevista | T2023-160 | Obra de Substituição Completa - Substituição do transformador 230/69/13,8 kV de 39 MVA (04T4), que está em final de vida útil, por um transformador de 100 MVA.(Ref. SGPMR 0001307/2022)(Rotina-Substituição - IdeMdl 10553). | ||||
| AXIA Energia Nordeste | ACU II | TR 230/138 kV ACU II TR3 RN | RBF | FT TR 230/138 kV ACU II TR3 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,822.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | TR 230/138 kV ACU II TR2 RN | RBF | FT TR 230/138 kV ACU II TR2 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,822.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | RTB 13,8 kV 5 Mvar ACU II RT1 RN | RBF | FT RTB 13,8 kV 5 MVAr ACU II RT1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MG 230 kV ACU II MG1 RN | RB | FT MG 230 kV ACU II MG1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$689,411.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MG 230 kV ACU II MG1 RN | RB | FT MG 230 kV ACU II MG1 RN | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/3/2013 | 12/2/2030 | R$15,712.98 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCOS DE BATERIAS 800A1 E 800A2 DE 125 Vcc. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ACU II | MG 230 kV ACU II MG1 RN | RB | FT MG 230 kV ACU II MG1 RN | 061/2001 | IPCA | RMEL | REN 643/2014 | 5/23/2015 | 5/22/2043 | R$62,261.05 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SISTEMAS AUTOMÁTICOS DE REGULAÇÃO ASSOCIADOS A TRANSFORMADORES.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ACU II | MG 230 kV ACU II MG1 RN | RB | FT MG 230 kV ACU II MG1 RN | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/17/2015 | 12/16/2030 | R$34,053.50 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SWITCH.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ACU II | MG 230 kV ACU II MG1 RN | RB | FT MG 230 kV ACU II MG1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,934,605.79 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MG 230 kV ACU II MG1 RN | RB | FT MG 230 kV ACU II MG1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,783,470.17 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MG 230 kV ACU II MG1 RN | RB | FT MG 230 kV ACU II MG1 RN | 061/2001 | IPCA | RMEL | REN 443/2011 | 10/4/2016 | 10/3/2033 | R$8,128.62 | 6/1/2025 | Ativa | Implantação de Banco de Baterias * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ACU II | MG 230 kV ACU II MG1 RN | RB | FT MG 230 kV ACU II MG1 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/17/2021 | 4/16/2038 | R$509,062.17 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ACU II | MC 69 kV TT 69/13,8 kV ACU II TA1 RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ACU II | MC 69 kV TR 230/69 kV ACU II TR7 RN | RBF | FT TR 230/69 kV ACU II TR7 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MC 69 kV TR 230/69 kV ACU II TR6 RN | RBF | FT TR 230/69 kV ACU II TR6 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MC 69 kV TR 230/69 kV ACU II TR6 RN | RBF | FT TR 230/69 kV ACU II TR6 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MC 69 kV TR 230/69 kV ACU II TR6 RN | RBF | FT TR 230/69 kV ACU II TR6 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$162,185.50 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MC 69 kV TR 230/69 kV ACU II TR5 RN | RBF | FT TR 230/69 kV ACU II TR5 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MC 69 kV TR 230/69 kV ACU II TR5 RN | RBF | FT TR 230/69 kV ACU II TR5 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/24/2021 | 6/23/2045 | R$7,866.81 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ACU II | MC 69 kV TR 230/69 kV ACU II TR4 RN | RBF | FT TR 230/69 kV ACU II TR4 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MC 69 kV TR 230/69 kV ACU II TR4 RN | RBF | FT TR 230/69 kV ACU II TR4 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/12/2021 | 2/14/2050 | R$41,511.15 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ACU II | MC 230 kV TR 230/69 kV ACU II TR7 RN | RBF | FT TR 230/69 kV ACU II TR7 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MC 230 kV TR 230/69 kV ACU II TR7 RN | RBF | FT TR 230/69 kV ACU II TR7 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/24/2022 | 11/23/2037 | R$1,964.47 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ACU II | MC 230 kV TR 230/69 kV ACU II TR6 RN | RBF | FT TR 230/69 kV ACU II TR6 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MC 230 kV TR 230/69 kV ACU II TR6 RN | RBF | FT TR 230/69 kV ACU II TR6 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$454,511.36 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MC 230 kV TR 230/69 kV ACU II TR6 RN | RBF | FT TR 230/69 kV ACU II TR6 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$419,003.95 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MC 230 kV TR 230/69 kV ACU II TR6 RN | RBF | FT TR 230/69 kV ACU II TR6 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/15/2019 | 1/21/2047 | R$45,353.81 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ACU II | MC 230 kV TR 230/69 kV ACU II TR5 RN | RBF | FT TR 230/69 kV ACU II TR5 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MC 230 kV TR 230/69 kV ACU II TR5 RN | RBF | FT TR 230/69 kV ACU II TR5 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/22/2019 | 12/24/2046 | R$87,150.62 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ACU II | MC 230 kV TR 230/69 kV ACU II TR4 RN | RBF | FT TR 230/69 kV ACU II TR4 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MC 230 kV TR 230/69 kV ACU II TR4 RN | RBF | FT TR 230/69 kV ACU II TR4 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/28/2019 | 5/2/2047 | R$88,120.29 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ACU II | MC 230 kV TR 230/138 kV ACU II TR3 RN | RBF | FT TR 230/138 kV ACU II TR3 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MC 230 kV TR 230/138 kV ACU II TR3 RN | RBF | FT TR 230/138 kV ACU II TR3 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/25/2022 | 1/10/2048 | R$20,947.68 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ACU II | MC 230 kV TR 230/138 kV ACU II TR2 RN | RBF | FT TR 230/138 kV ACU II TR2 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MC 230 kV TR 230/138 kV ACU II TR2 RN | RBF | FT TR 230/138 kV ACU II TR2 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$454,511.36 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MC 230 kV TR 230/138 kV ACU II TR2 RN | RBF | FT TR 230/138 kV ACU II TR2 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/29/2019 | 8/5/2043 | R$110,522.58 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ACU II | MC 138 kV TR 230/138 kV ACU II TR3 RN | RBF | FT TR 230/138 kV ACU II TR3 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$112,381.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MC 138 kV TR 230/138 kV ACU II TR2 RN | RBF | FT TR 230/138 kV ACU II TR2 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$112,381.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MC 138 kV TR 230/138 kV ACU II TR2 RN | RBF | FT TR 230/138 kV ACU II TR2 RN | 061/2001 | IPCA | RMEL | REN 443/2011 | 4/10/2016 | 4/13/2046 | R$10,948.02 | 6/1/2025 | Ativa | Substituído TC QDR 145 com vazamento de óleo. Posição Operacional: 93T2-A/ACD. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ACU II | MC 138 kV TR 230/138 kV ACU II TR2 RN | RBF | FT TR 230/138 kV ACU II TR2 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/17/2021 | 6/20/2051 | R$32,763.52 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ACU II | MC 13,8 kV TR 230/69 kV ACU II TR5 RN | RBF | FT TR 230/69 kV ACU II TR5 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MC 13,8 kV TR 230/69 kV ACU II TR4 RN | RBF | FT TR 230/69 kV ACU II TR4 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MC 13,8 kV RTB 13,8 kV 5 Mvar ACU II RT1 RN | RBF | FT RTB 13,8 kV 5 MVAr ACU II RT1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,598.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MC 13,8 kV BC 13,8 kV 3,6 Mvar ACU II BC4 RN | RBF | FT BC 13,8 kV 3,6 MVAr ACU II BC4 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MC 13,8 kV BC 13,8 kV 3,6 Mvar ACU II BC4 RN | RBF | FT BC 13,8 kV 3,6 MVAr ACU II BC4 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MC 13,8 kV BC 13,8 kV 3,6 Mvar ACU II BC3 RN | RBF | FT BC 13,8 kV 3,6 MVAr ACU II BC3 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MC 13,8 kV BC 13,8 kV 3,6 Mvar ACU II BC3 RN | RBF | FT BC 13,8 kV 3,6 MVAr ACU II BC3 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MC 13,8 kV BC 13,8 kV 3,1 Mvar ACU II BC2 RN | RBF | FT BC 13,8 kV 3,1 MVAr ACU II BC2 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | MC 13,8 kV BC 13,8 kV 3,1 Mvar ACU II BC2 RN | RBF | FT BC 13,8 kV 3,1 MVAr ACU II BC2 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/12/2022 | 5/11/2037 | R$7,174.78 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ACU II | MC 13,8 kV BC 13,8 kV 3,1 Mvar ACU II BC1 RN | RBF | FT BC 13,8 kV 3,1 MVAr ACU II BC1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | IB 69 kV MG 230 kV ACU II MG1 RN IB2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ACU II | IB 69 kV MG 230 kV ACU II MG1 RN IB2 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$118,244.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ACU II | IB 230 kV MG 230 kV ACU II MG1 RN IB1 | RB | FT MG 230 kV ACU II MG1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,085.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | IB 230 kV MG 230 kV ACU II MG1 RN IB1 | RB | FT MG 230 kV ACU II MG1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$373,459.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | IB 138 kV MG 230 kV ACU II MG1 RN IB3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$86,825.51 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ACU II | IB 13,8 kV MG 230 kV ACU II MG1 RN IB4 | RBF | FT TR 230/69 kV ACU II TR5 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,840.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | IB 13,8 kV MG 230 kV ACU II MG1 RN IB4 | RBF | FT TR 230/69 kV ACU II TR5 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$78,124.73 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | EL 69 kV ACU II DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ACU II | EL 69 kV ACU II DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ACU II | EL 69 kV ACU II DIST5 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/20/2022 | 4/19/2046 | R$8,086.18 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | ACU II | EL 69 kV ACU II DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ACU II | EL 69 kV ACU II DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ACU II | EL 69 kV ACU II DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ACU II | EL 69 kV ACU II DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ACU II | EL 69 kV ACU II DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ACU II | EL 69 kV ACU II DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ACU II | EL 69 kV ACU II DIST2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/2/2022 | 5/1/2055 | R$61,188.21 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | ACU II | EL 69 kV ACU II DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ACU II | EL 69 kV ACU II DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ACU II | EL 230 kV ACU II LT 230 kV PARAISO /ACU II C-3 RN | RB | FT LT 230 kV PARAISO /ACU II C-3 RN | 019/2010 | IPCA | RBL | CC 019/2010 | 11/23/2010 | 11/23/2040 | R$404,537.24 | 6/1/2025 | Ativa | T2010-090-B | Rede Básica e ICGLT, C3, 230 kV Paraíso - Açu II; LT, C2, 230 kV Açu II - Mossoró II; (Rede Básica). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | ACU II | EL 230 kV ACU II LT 230 kV PARAISO /ACU II C-2 RN | RB | FT LT 230 kV PARAISO /ACU II C-2 RN | 012/2007 | IPCA | RBL | CC 012/2007 | 6/14/2007 | 6/14/2037 | R$349,741.97 | 6/1/2025 | Ativa | T2000-117-A | Contrato de Concessão nº 012/2007 *(Considera adicional de RGR relativo à prorrogação do encargo). Receita revisada em 19/06/2012 no reajuste para o Ciclo 2012-2013. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | ACU II | EL 230 kV ACU II LT 230 kV ACU III /ACU II C-3 RN | RB | FT LT 230 kV ACU III /ACU II C-3 RN | 019/2010 | IPCA | RBL | CC 019/2010 | 11/23/2010 | 11/23/2040 | R$404,537.24 | 6/1/2025 | Ativa | T2010-090-B | Rede Básica e ICGLT, C3, 230 kV Paraíso - Açu II; LT, C2, 230 kV Açu II - Mossoró II; (Rede Básica). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | ACU II | EL 230 kV ACU II LT 230 kV ACU III /ACU II C-1 RN | RB | FT LT 230 kV ACU III /ACU II C-1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | EL 230 kV ACU II LT 230 kV ACU III /ACU II C-1 RN | RB | FT LT 230 kV ACU III /ACU II C-1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | EL 230 kV ACU II LT 230 kV ACU III /ACU II C-1 RN | RB | FT LT 230 kV ACU III /ACU II C-1 RN | 061/2001 | IPCA | RBNI | REA 5861/2016 | 6/10/2016 | 6/9/2044 | R$21,851.09 | 6/1/2025 | Ativa | EL 230 kV ACU II LT 230 kV MOSSORO II /ACU II C-1 RN * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ACU II | EL 230 kV ACU II LT 230 kV ACU III /ACU II C-1 RN | RB | FT LT 230 kV ACU III /ACU II C-1 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/11/2019 | 2/21/2048 | R$64,467.21 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ACU II | EL 138 kV ACU II LT 138 kV ACU II /SAN.MATOS II C-1 RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$167,571.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ACU II | EL 138 kV ACU II LT 138 kV ACU II /SAN.MATOS II C-1 RN | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/21/2022 | 4/23/2052 | R$50,308.78 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | ACU II | EL 138 kV ACU II DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$167,571.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ACU II | EL 138 kV ACU II DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$167,571.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ACU II | BC 13,8 kV 3,6 Mvar ACU II BC4 RN | RBF | FT BC 13,8 kV 3,6 MVAr ACU II BC4 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$29,742.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | BC 13,8 kV 3,6 Mvar ACU II BC4 RN | RBF | FT BC 13,8 kV 3,6 MVAr ACU II BC4 RN | 061/2001 | IPCA | RMEL | REN 643/2014 | 1/15/2014 | 1/14/2029 | R$31,159.75 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS CAPACITORES DE ASCAREL FABRICADO POR INDUCON MODELO FPA2 15KV 01H4 Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ACU II | BC 13,8 kV 3,6 Mvar ACU II BC4 RN | RBF | FT BC 13,8 kV 3,6 MVAr ACU II BC4 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$83,462.83 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | BC 13,8 kV 3,6 Mvar ACU II BC3 RN | RBF | FT BC 13,8 kV 3,6 MVAr ACU II BC3 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$29,742.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | BC 13,8 kV 3,6 Mvar ACU II BC3 RN | RBF | FT BC 13,8 kV 3,6 MVAr ACU II BC3 RN | 061/2001 | IPCA | RMEL | REN 643/2014 | 1/24/2014 | 1/23/2029 | R$31,218.77 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS CAPACITORES DE ASCAREL FABRICADO POR INDUCON MODELO FPA2 15KV 01H3 Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ACU II | BC 13,8 kV 3,6 Mvar ACU II BC3 RN | RBF | FT BC 13,8 kV 3,6 MVAr ACU II BC3 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$83,462.83 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | BC 13,8 kV 3,1 Mvar ACU II BC2 RN | RBF | FT BC 13,8 kV 3,1 MVAr ACU II BC2 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$29,742.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | BC 13,8 kV 3,1 Mvar ACU II BC2 RN | RBF | FT BC 13,8 kV 3,1 MVAr ACU II BC2 RN | 061/2001 | IPCA | RMEL | REN 643/2014 | 1/17/2014 | 1/16/2029 | R$31,172.86 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS CAPACITORES DE ASCAREL FABRICADO POR INDUCON MODELO FPA2 15KV 01H2 Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ACU II | BC 13,8 kV 3,1 Mvar ACU II BC1 RN | RBF | FT BC 13,8 kV 3,1 MVAr ACU II BC1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$29,742.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ACU II | BC 13,8 kV 3,1 Mvar ACU II BC1 RN | RBF | FT BC 13,8 kV 3,1 MVAr ACU II BC1 RN | 061/2001 | IPCA | RMEL | REN 643/2014 | 1/22/2014 | 1/21/2029 | R$31,205.64 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS CAPACITORES DE ASCAREL FABRICADO POR INDUCON MODELO FPA2 15KV 01H1 Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ACU III | MG 230 kV ACU III MG7 RN | RB | FT MG 230 kV ACU III MG7 RN | 061/2001 | IPCA | RBNI | DSP 1307/2022 | 3/18/2022 | 12/31/2042 | R$21,191.25 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 2 Módulos de Infraestrutura de Manobra 230 kV na SE Açu III, associados as Entradas de Linha 230 kV para as SE´sAçu II e Mossoró II, em função do seccionamento da LT 230 kV Açu II - Mossoró II C1 na SE Açu III. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ACU III | MG 230 kV ACU III MG6 RN | RB | FT MG 230 kV ACU III MG6 RN | 019/2010 | IPCA | RBNI | DSP 1269/2022 | 1/31/2022 | 11/22/2040 | R$44,062.88 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 2 Módulos de Infraestrutura de Manobra 230 kV na SE Açu III, associados as Entradas de Linha 230 kV para as SE´sAçu II e Mossoró II, em função do seccionamento da LT 230 kV Açu II - Mossoró II C2 na SE Açu III. | |||
| AXIA Energia Nordeste | ACU III | EL 230 kV ACU III LT 230 kV MOSSORO II /ACU III C-2 RN | RB | FT LT 230 kV MOSSORO II /ACU III C-2 RN | 019/2010 | IPCA | RBNI | DSP 1269/2022 | 1/31/2022 | 11/22/2040 | R$224,112.37 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo barra dupla com quatro chaves, na Subestação Açu III, associada à Linha de Transmissão 230 kV Açu III – Mossoró II C2. | |||
| AXIA Energia Nordeste | ACU III | EL 230 kV ACU III LT 230 kV MOSSORO II /ACU III C-1 RN | RB | FT LT 230 kV MOSSORO II /ACU III C-1 RN | 061/2001 | IPCA | RBNI | DSP 1307/2022 | 3/18/2022 | 12/31/2042 | R$107,782.76 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo barra dupla com quatro chaves, na Subestação Açu III, associada à Linha de Transmissão 230 kV Açu III – Mossoró II C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ACU III | EL 230 kV ACU III LT 230 kV ACU III /ACU II C-3 RN | RB | FT LT 230 kV ACU III /ACU II C-3 RN | 019/2010 | IPCA | RBNI | DSP 1269/2022 | 1/31/2022 | 11/22/2040 | R$224,112.37 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo barra dupla com quatro chaves, na Subestação Açu III, associada à Linha de Transmissão 230 kV Açu II – Açu III C2. | |||
| AXIA Energia Nordeste | ACU III | EL 230 kV ACU III LT 230 kV ACU III /ACU II C-1 RN | RB | FT LT 230 kV ACU III /ACU II C-1 RN | 061/2001 | IPCA | RBNI | DSP 1307/2022 | 3/18/2022 | 12/31/2042 | R$107,782.76 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo barra dupla com quatro chaves, na Subestação Açu III, associada à Linha de Transmissão 230 kV Açu II – Açu III C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | TT 13,8/0,12 kV ADRIANOPOLIS TR55 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR55 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | TT 13,8/0,12 kV ADRIANOPOLIS TR53 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR53 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | TT 13,8/0,12 kV ADRIANOPOLIS TR2B RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2B RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | TT 13,8/0,12 kV ADRIANOPOLIS TR2A RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2A RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | TT 13,8/0,12 kV ADRIANOPOLIS TR1B RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR1B RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | TR 500/345 kV ADRIANOPOLIS TRR1 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TRR1 RJ | 062/2001 | IPCA | RMEL | REA 8707/2020 | 10/9/2020 | 9/17/2055 | R$ 2,288,440.65 | 6/1/2025 | Ativa | T2019-021 | Obra de Substituição Completa - Substituição do Módulo de Equipamento - Unidade Monofásica do Autransformador Reserva (TRR1) 500/345/13,8 kV - 186,7 MVA na SE Adrianópolis *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | ADRIANOPOLIS | TR 500/345 kV ADRIANOPOLIS TR55 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR55 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,828,419.99 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | TR 500/345 kV ADRIANOPOLIS TR53 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR53 RJ | 062/2001 | IPCA | RMEL | REA 8707/2020 | 12/19/2020 | 11/27/2055 | R$ 6,901,546.14 | 6/1/2025 | Ativa | T2019-021 | Obra de Substituição Completa - Substituição do Módulo de Equipamento - Banco de Autransformador Monofásico AT53 500/345/13,8 kV - 3x186,7 MVA, na SE Adrianópolis *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | ADRIANOPOLIS | TR 500/345 kV ADRIANOPOLIS TR51 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR51 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,828,419.99 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | TR 345/138 kV ADRIANOPOLIS TRR2 RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TRR2 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$290,931.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | TR 345/138 kV ADRIANOPOLIS TRR1 RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TRR1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$290,931.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | TR 345/138 kV ADRIANOPOLIS TRR1 RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TRR1 RJ | 062/2001 | IPCA | RMELP | REA 8707/2020 | R$974,621.92 | 6/1/2025 | Prevista | T2019-021 | Obra de Substituição Completa - Substituição do Módulo de Equipamento - Unidade Monofásica do Autransformador Reserva (TRR1) 345/138/13,8 kV - 75 MVA na SE Adrianópolis. | ||||
| AXIA Energia | ADRIANOPOLIS | TR 345/138 kV ADRIANOPOLIS TR2B RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2B RJ | 062/2001 | IPCA | RMEL | REA 8707/2020 | 5/10/2022 | 4/17/2057 | R$ 4,896,901.21 | 6/1/2025 | Ativa | T2019-021 | Obra de Substituição Completa - Substituição do Módulo de Equipamento - Banco de Autransformador AT2B 345/138 kV - 3 x 75 MVA na SE Adrianópolis. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | ADRIANOPOLIS | TR 345/138 kV ADRIANOPOLIS TR2A RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2A RJ | 062/2001 | IPCA | RMEL | REN 643/2014 | 10/17/2015 | 10/16/2048 | R$ 1,976,731.76 | 6/1/2025 | Ativa | Obra de Substituição Parcial - Revitalização Necessária: Substituição das fases A e B do banco de Autotransformadores AT2A. PMI 2014-2017, incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | TR 345/138 kV ADRIANOPOLIS TR2A RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2A RJ | 062/2001 | IPCA | RMEL | REA 8707/2020 | 5/17/2021 | 4/24/2056 | R$ 1,598,868.90 | 6/1/2025 | Ativa | T2019-021 | Obra de Substituição Parcial - Substituição do Módulo de Equipamento - Fase C do Banco de Autotransformador AT2A 345/138 kV - 75 MVA na SE Adrianópolis *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | ADRIANOPOLIS | TR 345/138 kV ADRIANOPOLIS TR2A RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2A RJ | 062/2001 | IPCA | RMELP | DSP 1108/2024 | R$ 1,631,670.27 | 6/1/2025 | Prevista | T2024-096 | Obra de Substituição Parcial: Substituição da fase A do TR AT2A 345/138 kV (num série A13112) na SE Adrianópolis. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia | ADRIANOPOLIS | TR 345/138 kV ADRIANOPOLIS TR1B RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR1B RJ | 062/2001 | IPCA | RMEL | REN 643/2014 | 11/21/2015 | 12/11/2048 | R$ 1,981,623.54 | 6/1/2025 | Ativa | Obra de Substituição Parcial - Revitalização Necessária: Substituição das fases A e B do banco de Autotransformadores AT1B. PMI 2014-2017, incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | TR 345/138 kV ADRIANOPOLIS TR1B RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR1B RJ | 062/2001 | IPCA | RMEL | REA 8707/2020 | 12/11/2020 | 11/19/2055 | R$ 1,584,267.17 | 6/1/2025 | Ativa | T2019-021 | Obra de Substituição Parcial (Completada) - Substituição do Módulo de Equipamento - Fase C do Banco de Autotransformador AT1B 345/138 kV - 75 MVA na SE Adrianópolis *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | ADRIANOPOLIS | TR 345/138 kV ADRIANOPOLIS TR1A RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR1A RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$872,793.69 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | RTB 500 kV 45,3 Mvar ADRIANOPOLIS RBR1 RJ | RB | FT RTB 500 kV 45,3 Mvar ADRIANOPOLIS RBR1 RJ | 062/2001 | IPCA | RBNI | REA 10283/2021 | 8/29/2024 | 8/28/2060 | R$662,742.42 | 6/1/2025 | Ativa | T2021-052 | Instalação de uma unidade de reator de barra reserva, 500 kV, 45,3 MVA, na SE Adrianópolis. | ||
| AXIA Energia | ADRIANOPOLIS | RTB 500 kV 136 Mvar ADRIANOPOLIS RTB6 RJ | RB | FT RTB 500 kV 136 Mvar ADRIANOPOLIS RTB6 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$715,674.32 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | RTB 500 kV 136 Mvar ADRIANOPOLIS RTB6 RJ | RB | FT RTB 500 kV 136 Mvar ADRIANOPOLIS RTB6 RJ | 062/2001 | IPCA | RBNI | REA 10283/2021 | 8/29/2024 | 8/28/2025 | R$ 2,461,959.62 | 6/1/2025 | Ativa | T2021-052 | Remanejamento do banco de reatores RT06 da linha para a barra de 500 kV na SE Adrianópolis. | ||
| AXIA Energia | ADRIANOPOLIS | RTB 500 kV 136 Mvar ADRIANOPOLIS RTB5 RJ | RB | FT RTB 500 kV 136 Mvar ADRIANOPOLIS RTB5 RJ | 062/2001 | IPCA | RBNI | REA 10283/2021 | 8/29/2024 | 8/28/2060 | R$ 1,988,227.25 | 6/1/2025 | Ativa | T2021-052 | Obra de Substituição Completa - Instalação do banco de reator de barras RT05, 500 kV, 3 x 45,3 MVA, na SE Adrianópolis, em substituição ao reator de linha RTL5 por final de vida útil. O equipamento a ser substituído é o RTL 500 kV 136 MVAr ADRIANOPOLIS RT5 RJ (IdeMdl = 13790). | ||
| AXIA Energia | ADRIANOPOLIS | RTB 13,8 kV 50 Mvar ADRIANOPOLIS RTR2 RJ | RB | FT RTB 13,8 kV 50 Mvar ADRIANOPOLIS RTR2 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$177,554.19 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | RTB 13,8 kV 50 Mvar ADRIANOPOLIS RT4 RJ | RB | FT RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT4 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$177,554.19 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | RTB 13,8 kV 50 Mvar ADRIANOPOLIS RT3 RJ | RB | FT RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT3 RJ | 062/2001 | IPCA | RMEL | REA 8707/2020 | 1/8/2024 | 1/7/2060 | R$544,007.18 | 6/1/2025 | Ativa | T2019-021 | Obra de Substituição Completa - Substituição do Módulo de Equipamento - Reator Trifásico RT03 13,8 kV 50 Mvar na SE Adrianópolis | ||
| AXIA Energia | ADRIANOPOLIS | MG 500 kV ADRIANOPOLIS MG1 RJ | RB | FT MG 500 kV ADRIANOPOLIS MG1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,678,051.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MG 500 kV ADRIANOPOLIS MG1 RJ | RB | FT MG 500 kV ADRIANOPOLIS MG1 RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/31/2017 | 3/27/2033 | R$ 323.50 | 6/1/2025 | Ativa | Substituição de IHMs do Sistema de Supervisão e Controle Local (SAGE) por obsolescência ou por atualização tecnológica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MG 500 kV ADRIANOPOLIS MG1 RJ | RB | FT MG 500 kV ADRIANOPOLIS MG1 RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 10/5/2015 | 10/4/2028 | R$6,723.97 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (008654/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MG 500 kV ADRIANOPOLIS MG1 RJ | RB | FT MG 500 kV ADRIANOPOLIS MG1 RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/14/2016 | 8/9/2029 | R$7,398.22 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (004269/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MG 500 kV ADRIANOPOLIS MG1 RJ | RB | FT MG 500 kV ADRIANOPOLIS MG1 RJ | 062/2001 | IPCA | RBNI | REA 10283/2021 | 9/13/2024 | 9/12/2055 | R$603,141.49 | 6/1/2025 | Ativa | T2021-052 | Adequação do módulo de infraestrutura geral com um módulo de infraestrutura de manobra para instalação de um banco de reator de barraRT05 na SE Adrianópolis. | ||
| AXIA Energia | ADRIANOPOLIS | MG 500 kV ADRIANOPOLIS MG1 RJ | RB | FT MG 500 kV ADRIANOPOLIS MG1 RJ | 062/2001 | IPCA | RBNI | REA 10283/2021 | 9/13/2024 | 9/12/2055 | R$603,141.49 | 6/1/2025 | Ativa | T2021-052 | Adequação do módulo de infraestrutura geral com um módulo de infraestrutura de manobra para o remanejamento do banco de reator de linhaRT06 para a barra de 500 kV na SE Adrianópolis. | ||
| AXIA Energia | ADRIANOPOLIS | MG 500 kV ADRIANOPOLIS MG1 RJ | RB | FT MG 500 kV ADRIANOPOLIS MG1 RJ | 062/2001 | IPCA | RBNI | REA 10283/2021 | 9/13/2024 | 9/12/2055 | R$603,141.49 | 6/1/2025 | Ativa | T2021-052 | Adequação do módulo de infraestrutura geral com um módulo de infraestrutura de manobra para a expansão do barramento de 500 kV associado a manobra dos reatores de barra autorizados. | ||
| AXIA Energia | ADRIANOPOLIS | MG 500 kV ADRIANOPOLIS MG1 RJ | RB | FT MG 500 kV ADRIANOPOLIS MG1 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 4/27/2015 | 6/8/2042 | R$335,764.78 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 500 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR55 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MC 500 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR55 RJ | 062/2001 | IPCA | RBNI | DSP 1423/2021 | 7/21/2021 | 7/24/2051 | R$58,037.03 | 6/1/2025 | Ativa | Substituição de 1 Secionadora sem Chave de Terra do vão LTADSJ (SC9107). Capacidade do novo equipamento: Capacidade nominal de curto-circuito (kA): 50 kA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 500 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR55 RJ | 062/2001 | IPCA | RBNI | DSP 1423/2021 | 7/20/2021 | 7/23/2051 | R$58,032.58 | 6/1/2025 | Ativa | Substituição de 1 Secionadora sem Chave de Terra do vão LTADSJ (SC9105). Capacidade do novo equipamento: Capacidade nominal de curto-circuito (kA): 50 kA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 500 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR55 RJ | 062/2001 | IPCA | RBNI | DSP 1423/2021 | 7/21/2021 | 4/25/2054 | R$346,341.18 | 6/1/2025 | Ativa | Substituição de 1 Disjuntor do vão LTADSJ (DJ9106). Capacidade do novo equipamento: Capacidade nominal de curto-circuito (kA): 50 kA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 500 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR55 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/2/2022 | 6/4/2052 | R$59,443.05 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 500 kV TR 500/345 kV ADRIANOPOLIS TR53 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR53 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MC 500 kV TR 500/345 kV ADRIANOPOLIS TR53 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR53 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/25/2021 | 8/20/2047 | R$554,440.38 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 500 kV TR 500/345 kV ADRIANOPOLIS TR51 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR51 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MC 500 kV RTB 500 kV 136 Mvar ADRIANOPOLIS RTB6 RJ | RB | FT RTB 500 kV 136 Mvar ADRIANOPOLIS RTB6 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,673.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MC 500 kV RTB 500 kV 136 Mvar ADRIANOPOLIS RTB6 RJ | RB | FT RTB 500 kV 136 Mvar ADRIANOPOLIS RTB6 RJ | 062/2001 | IPCA | RBNI | REA 10283/2021 | 8/29/2024 | 8/28/2053 | R$ 1,021,283.88 | 6/1/2025 | Ativa | T2021-052 | Remanejamento e adequações no módulo de conexão do reator RT06 que será transferido para barra de 500 kV da SE Adrianópolis. | ||
| AXIA Energia | ADRIANOPOLIS | MC 500 kV RTB 500 kV 136 Mvar ADRIANOPOLIS RTB5 RJ | RB | FT RTB 500 kV 136 Mvar ADRIANOPOLIS RTB5 RJ | 062/2001 | IPCA | RBNI | REA 10283/2021 | 8/29/2024 | 8/28/2053 | R$ 1,524,676.30 | 6/1/2025 | Ativa | T2021-052 | Obra de Substituição Completa - Instalação de módulo de conexão de reator de barra RTB5 referente ao RT05 na SE Adrianópolis. O equipamento a ser substituído é o MC 500 kV RTL 500 kV 136 MVAr ADRIANOPOLIS RT5 RJ (IdeMdl = 42077). | ||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR55 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR55 RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/20/2020 | 4/23/2050 | R$46,781.70 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora (SC853) do módulo de conexão reerente ao banco de autotransormadores AT 55, 525/345/13,8 kV, 560 MVA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR55 RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/20/2020 | 4/23/2050 | R$46,781.70 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora (SC855) do módulo de conexão referente ao banco de autotransformadores AT 55, 525/345/13,8 kV, 560 MVA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR55 RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/20/2020 | 4/23/2050 | R$46,781.70 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora (SC857) do módulo de conexão referente ao banco de autotransformadores AT 55, 525/345/13,8 kV, 560 MVA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR55 RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/20/2020 | 4/23/2050 | R$46,781.70 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora (SC859) do módulo de conexão referente ao banco de autotransformadores AT 55, 525/345/13,8 kV, 560 MVA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR55 RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/20/2020 | 4/23/2050 | R$101,603.36 | 6/1/2025 | Ativa | Substituição de 3 TC´s do módulo de conexão referente ao banco de autotransformadores AT 55, 525/345/13,8 kV, 560 MVA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR55 RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/20/2020 | 4/23/2050 | R$46,781.70 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora (SC851) do módulo de conexão reerente ao banco de autotransormadores AT 55, 525/345/13,8 kV, 560 MVA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR55 RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/20/2020 | 2/28/2053 | R$265,070.02 | 6/1/2025 | Ativa | Substituição do disjuntor de 25 kA, 345 kV (nº 856) do módulo de conexão referente ao banco de autotransformadores AT 55, 525/345/13,8 kV, 560 MVA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 500/345 kV ADRIANOPOLIS TR53 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR53 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 500/345 kV ADRIANOPOLIS TR53 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR53 RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 9/22/2020 | 8/6/2053 | R$267,772.70 | 6/1/2025 | Ativa | Substituição do disjuntor de 25 kA, 345 kV (nº 886) do módulo de conexão referente ao banco de autotransformadores AT 53, 520/345/13,8 kV, 560 MVA . * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 500/345 kV ADRIANOPOLIS TR53 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR53 RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 9/22/2020 | 9/25/2050 | R$102,853.62 | 6/1/2025 | Ativa | Substituição de 3 TC´s do módulo de conexão referente ao banco de autotransformadores AT 53, 520/345/13,8 kV, 560 MVA . * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 500/345 kV ADRIANOPOLIS TR53 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR53 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 2/8/2022 | 8/1/2040 | R$193,069.40 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 500/345 kV ADRIANOPOLIS TR51 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR51 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 500/345 kV ADRIANOPOLIS TR51 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR51 RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/22/2019 | 4/24/2049 | R$45,429.04 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora: Superação das seccionadoras no vão AT51(SC891), 520/345/13,8 kV, 560 MVA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 500/345 kV ADRIANOPOLIS TR51 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR51 RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 5/31/2019 | 6/2/2049 | R$45,573.91 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora (SC893) do módulo de conexão reerente ao banco de autotransormadores AT 51, 520/345/13,8 kV, 560 MVA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2B RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2B RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2B RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2B RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 9/22/2020 | 8/6/2053 | R$267,772.70 | 6/1/2025 | Ativa | Substituição do disjuntor de 25 kA, 345 kV (nº 866) do módulo de conexão referente ao banco de autotransformadores AT 2B, 345/138/13,8 kV, 225 MVA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2B RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2B RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 9/22/2020 | 9/25/2050 | R$102,853.62 | 6/1/2025 | Ativa | Substituição de 3 TC´s do módulo de conexão referente ao banco de autotransformadores AT 2B, 345/138/13,8 kV, 225 MVA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2B RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2B RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/28/2022 | 7/27/2037 | R$150,228.95 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2A RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2A RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/27/2015 | 10/19/2042 | R$69,557.10 | 6/1/2025 | Ativa | Substituição de 3 TC´s do módulo de conexão referente ao banco de autotransformadores AT 2A, 345/138/13,8 kV, 225 MVA. INCLUÍDA NO CICLO 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2A RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 9/22/2020 | 8/6/2053 | R$267,772.70 | 6/1/2025 | Ativa | Substituição do disjuntor de 25 kA, 345 kV (836) do módulo de conexão referente ao banco de autotransformadores AT 2A, 345/138/13,8 kV, 225 MVA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2A RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 9/22/2020 | 9/25/2050 | R$47,357.37 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora (SC831) do módulo de conexão referente ao banco de autotransformadores AT 2A, 345/138/13,8 kV, 225 MVA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2A RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 9/22/2020 | 9/25/2050 | R$47,357.37 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora (SC833) do módulo de conexão referente ao banco de autotransormadores AT 2A, 345/138/13,8 kV, 225 MVA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2A RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 9/22/2020 | 9/25/2050 | R$47,357.37 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora (SC835) do módulo de conexão referente ao banco de autotransformadores AT 2A, 345/138/13,8 kV, 225 MVA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2A RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 9/22/2020 | 9/25/2050 | R$47,357.37 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora (SC837) do módulo de conexão referente ao banco de autotransformadores AT 2A, 345/138/13,8 kV, 225 MVA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2A RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 9/22/2020 | 9/25/2050 | R$47,357.37 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora (SC839) do módulo de conexão referente ao banco de autotransformadores AT 2A, 345/138/13,8 kV, 225 MVA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2A RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2022 | 12/30/2037 | R$153,344.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR1B RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR1B RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 11/21/2015 | 11/20/2046 | R$183,350.26 | 6/1/2025 | Ativa | Substituição do disjuntor de 25 kA, 345 kV (nº 816) do módulo de conexão referente ao banco de autotransformadores AT 1B, 345/138/13,8 kV, 225 MVA. Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR1B RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 11/21/2015 | 12/13/2043 | R$30,371.67 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora (SC815) do módulo de conexão referente ao banco de autotransformadores AT 1B, 345/138/13,8 kV, 225 MVA. Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR1B RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 11/21/2015 | 12/13/2043 | R$30,371.67 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora (SC817) do módulo de conexão referente ao banco de autotransformadores AT 1B, 345/138/13,8 kV, 225 MVA. Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR1B RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 11/21/2015 | 12/13/2043 | R$30,371.67 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora (SC819) do módulo de conexão referente ao banco de autotransformadores AT 1B, 345/138/13,8 kV, 225 MVA. Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR1B RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 9/22/2020 | 9/25/2050 | R$47,357.37 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora (SC811) do módulo de conexão referente ao banco de autotransformadores AT 1B, 345/138/13,8 kV, 225 MVA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR1B RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 9/22/2020 | 9/25/2050 | R$47,357.37 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora (SC813) do módulo de conexão referente ao banco de autotransormadores AT 1B, 345/138/13,8 kV, 225 MVA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR1B RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2022 | 12/30/2037 | R$109,783.38 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1A RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR1A RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1A RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR1A RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/27/2015 | 10/19/2042 | R$69,557.10 | 6/1/2025 | Ativa | Substituição de 3 TC´s do módulo de conexão referente ao banco de autotransformadores AT 1A, 345/138/13,8 kV, 225 MVA. Reforço de Pequeno Porte reconhecido no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV BC 345 kV 160 Mvar ADRIANOPOLIS BC11 RJ | RB | FT BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$257,964.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV BC 345 kV 160 Mvar ADRIANOPOLIS BC11 RJ | RB | FT BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ | 062/2001 | IPCA | RMEL | REN 643/2014 | 1/12/2015 | 2/23/2045 | R$177,080.15 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 1 disjuntor (DJ8116C) PMI 2014-2017, incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV BC 345 kV 160 Mvar ADRIANOPOLIS BC10 RJ | RB | FT BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$257,964.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV BC 345 kV 160 Mvar ADRIANOPOLIS BC10 RJ | RB | FT BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/27/2015 | 10/19/2042 | R$41,691.87 | 6/1/2025 | Ativa | Substituição de 3 TC´s do módulo de conexão referente ao Banco de Capacitores Paralelo nº 10. Reforço de Pequeno Porte reconhecido no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 345 kV BC 345 kV 160 Mvar ADRIANOPOLIS BC10 RJ | RB | FT BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ | 062/2001 | IPCA | RMEL | REN 643/2014 | 1/19/2015 | 3/2/2045 | R$177,195.88 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 1 disjuntor (DJ8106C) PMI 2014-2017, incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 138 kV TR 345/138 kV ADRIANOPOLIS TR2B RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2B RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$107,257.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MC 138 kV TR 345/138 kV ADRIANOPOLIS TR2B RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2B RJ | 062/2001 | IPCA | RMEL | REN 643/2014 | 4/27/2015 | 10/19/2040 | R$30,161.52 | 6/1/2025 | Ativa | Substituição da proteção diferencial de barras PMI 2011-2014, incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 138 kV TR 345/138 kV ADRIANOPOLIS TR2B RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2B RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 4/30/2022 | 5/26/2041 | R$243,804.57 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 138 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2A RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$107,257.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MC 138 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2A RJ | 062/2001 | IPCA | RMEL | REN 643/2014 | 4/27/2015 | 10/19/2040 | R$30,161.52 | 6/1/2025 | Ativa | Substituição da proteção diferencial de barras PMI 2011-2014, incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 138 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2A RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/23/2021 | 12/18/2045 | R$475,022.83 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 138 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR1B RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$107,257.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MC 138 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR1B RJ | 062/2001 | IPCA | RMEL | REN 643/2014 | 4/27/2015 | 10/19/2040 | R$30,161.52 | 6/1/2025 | Ativa | Substituição da proteção diferencial de barras PMI 2011-2014, incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 138 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR1B RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 8/14/2021 | 10/12/2046 | R$400,068.36 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 138 kV TR 345/138 kV ADRIANOPOLIS TR1A RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR1A RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$107,257.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MC 138 kV TR 345/138 kV ADRIANOPOLIS TR1A RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR1A RJ | 062/2001 | IPCA | RMEL | REN 643/2014 | 4/27/2015 | 10/19/2040 | R$14,780.20 | 6/1/2025 | Ativa | Substituição da proteção diferencial de barras PMI 2011-2014, incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 13,8 kV TT 13,8/0,12 kV ADRIANOPOLIS TR55 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR55 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MC 13,8 kV TT 13,8/0,12 kV ADRIANOPOLIS TR53 RJ | RB | FT TR 500/345 kV ADRIANOPOLIS TR53 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MC 13,8 kV TT 13,8/0,12 kV ADRIANOPOLIS TR2B RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2B RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MC 13,8 kV TT 13,8/0,12 kV ADRIANOPOLIS TR2A RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR2A RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MC 13,8 kV TT 13,8/0,12 kV ADRIANOPOLIS TR1B RJ | RBF | FT TR 345/138 kV ADRIANOPOLIS TR1B RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MC 13,8 kV RTB 13,8 kV 50 Mvar ADRIANOPOLIS RT4 RJ | RB | FT RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT4 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,744.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MC 13,8 kV RTB 13,8 kV 50 Mvar ADRIANOPOLIS RT3 RJ | RB | FT RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT3 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,744.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MC 13,8 kV BC 13,8 kV 50 Mvar ADRIANOPOLIS BC6 RJ | RBF | FT BC 13,8 kV 50 Mvar ADRIANOPOLIS BC6 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$68,943.38 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MC 13,8 kV BC 13,8 kV 50 Mvar ADRIANOPOLIS BC6 RJ | RBF | FT BC 13,8 kV 50 Mvar ADRIANOPOLIS BC6 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/10/2022 | 3/28/2055 | R$44,307.93 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | MC 13,8 kV BC 13,8 kV 50 Mvar ADRIANOPOLIS BC5 RJ | RBF | FT BC 13,8 kV 50 Mvar ADRIANOPOLIS BC5 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$68,943.38 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | MC 13,8 kV BC 13,8 kV 50 Mvar ADRIANOPOLIS BC5 RJ | RBF | FT BC 13,8 kV 50 Mvar ADRIANOPOLIS BC5 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/10/2022 | 3/4/2055 | R$47,542.68 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | IB 500 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB6 | RB | FT MG 500 kV ADRIANOPOLIS MG1 RJ | 062/2001 | IPCA | RBNI | REA 10283/2021 | 9/13/2024 | 9/12/2053 | R$508,001.24 | 6/1/2025 | Ativa | T2021-052 | Expansão do barramento de 500 kV com um disjuntor e equipamentos associados para manobra dos reatores de barra autorizados. | ||
| AXIA Energia | ADRIANOPOLIS | IB 500 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB5 | RB | FT MG 500 kV ADRIANOPOLIS MG1 RJ | 062/2001 | IPCA | RBNI | REA 10283/2021 | 9/13/2024 | 9/12/2053 | R$508,001.24 | 6/1/2025 | Ativa | T2021-052 | Expansão do barramento de 500 kV com um disjuntor e equipamentos associados para manobra dos reatores de barra autorizados. | ||
| AXIA Energia | ADRIANOPOLIS | IB 500 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB4 | RB | FT MG 500 kV ADRIANOPOLIS MG1 RJ | 062/2001 | IPCA | RBNI | REA 10283/2021 | 9/13/2024 | 9/12/2053 | R$508,001.24 | 6/1/2025 | Ativa | T2021-052 | Expansão do barramento de 500 kV com um disjuntor e equipamentos associados para manobra dos reatores de barra autorizados. | ||
| AXIA Energia | ADRIANOPOLIS | IB 500 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB3 | RB | FT MG 500 kV ADRIANOPOLIS MG1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | IB 500 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB2 | RB | FT MG 500 kV ADRIANOPOLIS MG1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | IB 500 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB2 | RB | FT MG 500 kV ADRIANOPOLIS MG1 RJ | 062/2001 | IPCA | RBNI | DSP 1423/2021 | 2/28/2022 | 12/7/2054 | R$347,592.02 | 6/1/2025 | Ativa | Substituição de 1 Disjuntor do vão AT55 IB 500 KV MG1 RJ IB2 (DJ9416). Capacidade do novo equipamento: Capacidade nominal de curto-circuito (kA): 50 kA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | IB 500 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB2 | RB | FT MG 500 kV ADRIANOPOLIS MG1 RJ | 062/2001 | IPCA | RBNI | DSP 1423/2021 | 2/28/2022 | 3/2/2052 | R$59,024.80 | 6/1/2025 | Ativa | Substituição de 1 Secionadora sem Chave de Terra do vão AT55 IB 500 KV MG1 RJ IB2 (SC9415). Capacidade do novo equipamento: Capacidade nominal de curto-circuito (kA): 50kA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | IB 500 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB2 | RB | FT MG 500 kV ADRIANOPOLIS MG1 RJ | 062/2001 | IPCA | RBNI | DSP 1423/2021 | 2/28/2022 | 3/2/2052 | R$59,024.80 | 6/1/2025 | Ativa | Substituição de 1 Secionadora sem Chave de Terra do vão AT55 IB 500 KV MG1 RJ IB2 (SC9417). Capacidade do novo equipamento: Capacidade nominal de curto-circuito (kA): 50 kA * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | IB 345 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB3 | RB | FT MG 500 kV ADRIANOPOLIS MG1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | IB 345 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB3 | RB | FT MG 500 kV ADRIANOPOLIS MG1 RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 5/3/2017 | 10/15/2049 | R$179,422.84 | 6/1/2025 | Ativa | Substituição do disjuntor de 25 kA, 345 kV (nº 8006) do módulo de interligação de barramentos. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019* Receita alterada no recurso contra a REH 2.407/2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | IB 345 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB2 | RB | FT MG 500 kV ADRIANOPOLIS MG1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | IB 345 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB1 | RB | FT MG 500 kV ADRIANOPOLIS MG1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | IB 138 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB1 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$82,866.56 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ADRIANOPOLIS | IB 138 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB1 | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 4/27/2015 | 10/19/2040 | R$60,323.05 | 6/1/2025 | Ativa | Substituição da proteção diferencial de barras PMI 2011-2014, incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | ADRIANOPOLIS | IB 138 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB1 | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 8/16/2020 | 1/14/2052 | R$319,942.43 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | ADRIANOPOLIS | EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ | RB | FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ | RB | FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/2/2021 | 6/29/2052 | R$620,580.64 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ | 062/2001 | IPCA | RBNI | DSP 1423/2021 | 6/7/2021 | 6/10/2051 | R$57,841.25 | 6/1/2025 | Ativa | Substituição de 1 Secionadora sem Chave de Terra do vão LTADRTMR1 (SC9237). Capacidade do novo equipamento: Capacidade nominal de curto-circuito (kA):50 kA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ | 062/2001 | IPCA | RBNI | DSP 1423/2021 | 6/7/2021 | 6/10/2051 | R$57,841.25 | 6/1/2025 | Ativa | Substituição de 1 Secionadora sem Chave de Terra do vão LTADRTMR1 (SC9235) . Capacidade do novo equipamento: Capacidade nominal de curto-circuito (kA): 50 kA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ | 062/2001 | IPCA | RBNI | DSP 1423/2021 | 6/7/2021 | 3/12/2054 | R$346,793.30 | 6/1/2025 | Ativa | Substituição de 1 Disjuntor do vão LTADRTMR1 (DJ9236). Capacidade do novo equipamento: Capacidade nominal de curto-circuito (kA): 50 kA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/13/2022 | 10/15/2052 | R$87,006.99 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ | 062/2001 | IPCA | RMEL | REN 643/2014 | 5/2/2016 | 11/25/2038 | R$40,615.29 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/5/2019 | 10/8/2050 | R$617,676.44 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/2/2019 | 7/15/2050 | R$729,000.25 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /B. FLUMINENSE C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /B. FLUMINENSE C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /B. FLUMINENSE C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /B. FLUMINENSE C-1 RJ | 062/2001 | IPCA | RBNI | DSP 1423/2021 | 6/24/2021 | 6/27/2051 | R$57,916.89 | 6/1/2025 | Ativa | Substituição de 1 Secionadora sem Chave de Terra do vão LTADGR (SC9127). Capacidade do novo equipamento: Capacidade nominal de curto-circuito (kA): 50 kA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /B. FLUMINENSE C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /B. FLUMINENSE C-1 RJ | 062/2001 | IPCA | RBNI | DSP 1423/2021 | 6/23/2021 | 6/26/2051 | R$57,912.46 | 6/1/2025 | Ativa | Substituição de 1 Secionadora sem Chave de Terra do vão LTADGR (SC9125). Capacidade do novo equipamento: Capacidade nominal de curto-circuito (kA): 50 kA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /B. FLUMINENSE C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /B. FLUMINENSE C-1 RJ | 062/2001 | IPCA | RBNI | DSP 1423/2021 | 6/24/2021 | 2/22/2054 | R$387,763.09 | 6/1/2025 | Ativa | Substituição de 1 Disjuntor do vão LTADGR (DJ9126). Capacidade do novo equipamento: Capacidade nominal de curto-circuito (kA): 50 kA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ | RB | FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ | RB | FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,229,990.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ | RB | FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,318,615.67 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /NOVA IGUACU C-1 RJ | RB | FT LT 345 kV ADRIANOPOLIS /NOVA IGUACU C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /NOVA IGUACU C-1 RJ | RB | FT LT 345 kV ADRIANOPOLIS /NOVA IGUACU C-1 RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/30/2019 | 4/29/2052 | R$169,937.96 | 6/1/2025 | Ativa | Substituição do disjuntor de 25 kA, 345 kV (nº 8166) do módulo de entrada de linha referente à Linha de Transmissão 345 kV Adrianópolis – Jacarepaguá, C2. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 – 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ | RB | FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ | RB | FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/27/2015 | 10/19/2042 | R$65,267.46 | 6/1/2025 | Ativa | Substituição de 3 TC´s do módulo de entrada de linha referente à Linha de Transmissão 345 kV Adrianópolis – Jacarepaguá, C1. Reforço de Pequeno Porte reconhecido no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ | RB | FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 6/24/2016 | 4/8/2047 | R$196,350.78 | 6/1/2025 | Ativa | Substituição do disjuntor de 25 kA, 345 kV (8156) do módulo de entrada de linha referente à Linha de Transmissão 345 kV Adrianópolis – Jacarepaguá, C1. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | 062/2001 | IPCA | RBNI | REA 3578/2012 | 5/6/2015 | 10/16/2045 | R$160,377.63 | 6/1/2025 | Ativa | Substituição do disjuntor de 25 kA, 345 kV (8146) do módulo de entrada de linha referente à Linha de Transmissão 345 kV Adrianópolis – Itutinga, C2. INCLUÍDA NO CICLO 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | 062/2001 | IPCA | RBNI | REA 3578/2012 | 5/6/2015 | 11/27/2042 | R$55,964.94 | 6/1/2025 | Ativa | Substituição de 2 chaveS seccionadora (SC8145 , 8149) do módulo de entrada de linha referente à Linha de Transmissão 345 kV Adrianópolis – Itutinga, C2.INCLUÍDA NO CICLO 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | 062/2001 | IPCA | RBNI | REA 3578/2012 | 5/6/2015 | 11/27/2042 | R$40,554.30 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora (SC8147/8140T) do módulo de entrada de linha referente à Linha de Transmissão 345 kV Adrianópolis – Itutinga, C2. INCLUÍDA NO CICLO 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/22/2019 | 4/24/2049 | R$55,808.61 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora: Superação das seccionadoras no vão Itutinga C2 (SC8141). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | 062/2001 | IPCA | RBNI | REA 3578/2012 | 5/31/2019 | 6/2/2049 | R$55,986.59 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora (SC8143) do módulo de entrada de linha reerente à Linha de Transmissão 345 kV Adrianópolis – Itutinga, C2. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/27/2015 | 9/6/2045 | R$160,232.85 | 6/1/2025 | Ativa | Substituição do disjuntor de 25 kA, 345 kV (8136) do módulo de entrada de linha referente à Linha de Transmissão 345 kV Adrianópolis – Itutinga C1. Reforço de Pequeno Porte reconhecido no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/27/2015 | 10/19/2042 | R$27,954.22 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora (SC8135) do módulo de entrada de linha referente à Linha de Transmissão 345 kV Adrianópolis – Itutinga C1. Reforço de Pequeno Porte reconhecido no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/27/2015 | 10/19/2042 | R$27,954.22 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora (SC8139) do módulo de entrada de linha referente à Linha de Transmissão 345 kV Adrianópolis – Itutinga C1. Reforço de Pequeno Porte reconhecido no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/27/2015 | 10/19/2042 | R$40,513.35 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora (SC8137/8130T) do módulo de entrada de linha referente à Linha de Transmissão 345 kV Adrianópolis – Itutinga C1. Reforço de Pequeno Porte reconhecido no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | 062/2001 | IPCA | RBNI | REA 3578/2012 | 2/14/2016 | 6/7/2044 | R$28,789.53 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora (SC8131) do módulo de entrada de linha referente à Linha de Transmissão 345 kV Adrianópolis – Itutinga, C1. Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/17/2020 | 4/20/2050 | R$57,456.66 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora (SC8133) do módulo de entrada de linha reerente à Linha de Transmissão 345 kV Adrianópolis – Itutinga, C1. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /COMPERJ C-1 RJ | RB | FT LT 345 kV ADRIANOPOLIS /COMPERJ C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /COMPERJ C-1 RJ | RB | FT LT 345 kV ADRIANOPOLIS /COMPERJ C-1 RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 5/3/2017 | 10/13/2049 | R$170,661.54 | 6/1/2025 | Ativa | Substituição do disjuntor de 25 kA, 345 kV (nº 8186) do módulo de entrada de linha referente à Linha de Transmissão 345 kV Adrianópolis – Macaé Merchant. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 * Receita alterada no recurso contra a REH 2.407/2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ADRIANOPOLIS | EL 138 kV ADRIANOPOLIS LT 138 kV IMBARIE /ADRIANOPOLIS C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$159,930.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ADRIANOPOLIS | EL 138 kV ADRIANOPOLIS LT 138 kV IMBARIE /ADRIANOPOLIS C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 8/8/2014 | 6/1/2039 | R$30,990.59 | 6/1/2025 | Ativa | Substituição da proteção da LI Adrianópolis - Imbariê - Alcântara PMI 2011-2014, incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | ADRIANOPOLIS | EL 138 kV ADRIANOPOLIS LT 138 kV IMBARIE /ADRIANOPOLIS C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 9/24/2019 | 10/25/2050 | R$345,112.11 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | ADRIANOPOLIS | EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-3 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$159,930.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ADRIANOPOLIS | EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-3 RJ | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 5/17/2014 | 12/9/2038 | R$30,666.76 | 6/1/2025 | Ativa | Substituição da proteção da LI Adrianópolis - Alcântara 3 PMI 2011-2014, incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | ADRIANOPOLIS | EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-3 RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/7/2019 | 5/21/2050 | R$330,451.54 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | ADRIANOPOLIS | EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$159,930.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ADRIANOPOLIS | EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-2 RJ | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 5/23/2014 | 12/15/2038 | R$30,688.63 | 6/1/2025 | Ativa | Substituição da proteção da LI Adrianópolis - Alcântara 2. PMI 2011-2014, incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | ADRIANOPOLIS | EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-2 RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/20/2019 | 4/6/2051 | R$346,324.53 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | ADRIANOPOLIS | EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$159,930.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ADRIANOPOLIS | EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 4/25/2014 | 10/18/2038 | R$30,578.06 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição da proteção da LI Adrianópolis - Alcântara 1. PMI 2011-2014, incluída no reajuste 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | ADRIANOPOLIS | EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/20/2020 | 1/19/2051 | R$361,303.39 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | ADRIANOPOLIS | EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /MAGE C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$159,930.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ADRIANOPOLIS | EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /MAGE C-2 RJ | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 3/30/2014 | 8/22/2038 | R$30,474.09 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição da proteção da LI Adrianópolis - Magé 2.PMI 2011-2014, incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | ADRIANOPOLIS | EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /MAGE C-2 RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/24/2019 | 7/1/2051 | R$312,390.57 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | ADRIANOPOLIS | EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /MAGE C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$159,930.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ADRIANOPOLIS | EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /MAGE C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 3/24/2014 | 8/16/2038 | R$30,452.08 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição da proteção da LI Adrianópolis - Magé 1. PMI 2011-2014, incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | ADRIANOPOLIS | EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /MAGE C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/4/2019 | 10/18/2050 | R$328,444.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | ADRIANOPOLIS | EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /CEPEL C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$159,930.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ADRIANOPOLIS | EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /CEPEL C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$159,930.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ADRIANOPOLIS | BC 345 kV 160 Mvar ADRIANOPOLIS BC11 RJ | RB | FT BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$286,548.69 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | BC 345 kV 160 Mvar ADRIANOPOLIS BC11 RJ | RB | FT BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,099,595.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | BC 345 kV 160 Mvar ADRIANOPOLIS BC10 RJ | RB | FT BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$286,548.69 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | BC 13,8 kV 50 Mvar ADRIANOPOLIS BC6 RJ | RBF | FT BC 13,8 kV 50 Mvar ADRIANOPOLIS BC6 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$166,198.56 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ADRIANOPOLIS | BC 13,8 kV 50 Mvar ADRIANOPOLIS BC5 RJ | RBF | FT BC 13,8 kV 50 Mvar ADRIANOPOLIS BC5 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$166,198.56 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | AGUA VERMELHA | TR 500/440 kV AGUA VERMELHA TRR1 SP | RB | FT TR 500/440 kV AGUA VERMELHA TRR1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$667,668.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | AGUA VERMELHA | TR 500/440 kV AGUA VERMELHA TR8 SP | RB | FT TR 500/440 kV AGUA VERMELHA TR8 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,003,004.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | AGUA VERMELHA | MG 500 kV AGUA VERMELHA MG2 SP | RB | FT MG 500 kV AGUA VERMELHA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,046,171.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | AGUA VERMELHA | MC 500 kV TR 500/440 kV AGUA VERMELHA TR8 SP | RB | FT TR 500/440 kV AGUA VERMELHA TR8 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | AGUA VERMELHA | MC 500 kV TR 500/440 kV AGUA VERMELHA TR8 SP | RB | FT TR 500/440 kV AGUA VERMELHA TR8 SP | 062/2001 | IPCA | RBNI | REA 7761/2019 | 4/3/2022 | 4/2/2037 | R$238,393.81 | 6/1/2025 | Ativa | Transformador TR-8 500/440/13.8 kV: Supervisão e circuitos secundários de corrente, potencial e controle. Modernização dos relés de proteção, devendo este ser estendido aos sistemas de comando, controle, supervisão, assim como os serviços auxiliares. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | AGUA VERMELHA | MC 500 kV TR 500/440 kV AGUA VERMELHA TR8 SP | RB | FT TR 500/440 kV AGUA VERMELHA TR8 SP | 062/2001 | IPCA | RBNI | REA 7761/2019 | 4/3/2022 | 4/2/2037 | R$15,593.75 | 6/1/2025 | Ativa | Transformador TR-8 500/440/13.8 kV: Supervisão e circuitos secundários de corrente, potencial e controle. Instalaçao do sistema de oscilografia com a finalidade de garantir a plena observabilidade do SIN. Reforço na capacidade dos equipamentos para atendimento dos requisitos dos submódulos 2.6 e 11.6 dos Procedimentos de Rede do ONS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | AGUA VERMELHA | MC 440 kV TR 500/440 kV AGUA VERMELHA TR8 SP | RB | FT TR 500/440 kV AGUA VERMELHA TR8 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | AGUA VERMELHA | MC 440 kV TR 500/440 kV AGUA VERMELHA TR8 SP | RB | FT TR 500/440 kV AGUA VERMELHA TR8 SP | 062/2001 | IPCA | RBNI | REA 7761/2019 | 4/3/2022 | 4/2/2037 | R$238,220.55 | 6/1/2025 | Ativa | Transformador TR-8 500/440/13.8 kV: Supervisão e circuitos secundários de corrente, potencial e controle. Modernização dos relés de proteção, devendo este ser estendido aos sistemas de comando, controle, supervisão, assim como os serviços auxiliares. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | AGUA VERMELHA | MC 440 kV TR 500/440 kV AGUA VERMELHA TR8 SP | RB | FT TR 500/440 kV AGUA VERMELHA TR8 SP | 062/2001 | IPCA | RBNI | REA 7761/2019 | 4/3/2022 | 4/2/2037 | R$15,593.75 | 6/1/2025 | Ativa | Transformador TR-8 500/440/13.8 kV: Supervisão e circuitos secundários de corrente, potencial e controle Instalaçao do sistema de oscilografia com a finalidade de garantir a plena observabilidade do SIN. Reforço na capacidade dos equipamentos para atendimento dos requisitos dos submódulos 2.6 e 11.6 dos Procedimentos de Rede do ONS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | AGUA VERMELHA | IB 500 kV MG 500 kV AGUA VERMELHA MG2 SP IB5 | RB | FT MG 500 kV AGUA VERMELHA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | AGUA VERMELHA | IB 440 kV MG 500 kV AGUA VERMELHA MG2 SP IB5 | RB | FT MG 500 kV AGUA VERMELHA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | AGUAS LINDAS | MG 230 kV AGUAS LINDAS MG2 GO | RB | FT MG 230 kV AGUAS LINDAS MG2 GO | 062/2001 | IPCA | RBNI | REA 2367/2010 | 11/26/2013 | 11/25/2036 | R$612,105.78 | 6/1/2025 | Ativa | T2009-133 | MG 230 kV AGUAS LINDAS MG2 GO *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | AGUAS LINDAS | MG 230 kV AGUAS LINDAS MG2 GO | RB | FT MG 230 kV AGUAS LINDAS MG2 GO | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/10/2014 | 6/9/2039 | R$13,903.96 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | AGUAS LINDAS | EL 230 kV AGUAS LINDAS LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO | RB | FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO | 062/2001 | IPCA | RBNI | REA 2367/2010 | 11/24/2013 | 2/13/2041 | R$959,470.28 | 6/1/2025 | Ativa | T2009-133 | Instalar, na SE AGUAS LINDAS, um módulo de entrada de linha para o circuito LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO originado do seccionamento do circuito LT 230 kV BARRO ALTO /BRAS. SUL C-1 GO/DF na SE AGUAS LINDAS. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | AGUAS LINDAS | EL 230 kV AGUAS LINDAS LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF | RB | FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF | 062/2001 | IPCA | RBNI | REA 2367/2010 | 11/24/2013 | 2/13/2041 | R$959,470.28 | 6/1/2025 | Ativa | T2009-133 | Instalar, na SE AGUAS LINDAS, um módulo de entrada de linha para o circuito LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF originado do seccionamento do circuito LT 230 kV BARRO ALTO /BRAS. SUL C-1 GO/DF na SE AGUAS LINDAS. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | ALAGOINHAS II | MG 230 kV ALAGOINHAS II MG2 BA | RB | FT MG 230 kV ALAGOINHAS II MG2 BA | 061/2001 | IPCA | RBNIA | REA 12983/2022 | R$170,257.58 | 6/1/2025 | Prevista | T2022-113 | MÓDULO DE INFRAESTRUTURA DE MANOBRA (230KV - BD4) na SE ALAGOINHAS II para conexão da LT 230 kV originada do seccionamento da LT 440 kV OLINDINA – CATU C1 | ||||
| AXIA Energia Nordeste | ALAGOINHAS II | MG 230 kV ALAGOINHAS II MG2 BA | RB | FT MG 230 kV ALAGOINHAS II MG2 BA | 061/2001 | IPCA | RBNIA | REA 12983/2022 | R$170,257.58 | 6/1/2025 | Prevista | T2022-113 | MÓDULO DE INFRAESTRUTURA DE MANOBRA (230KV - BD4) na SE ALAGOINHAS II para conexão da LT 230 kV originada do seccionamento da LT 440 kV OLINDINA – CATU C1 | ||||
| AXIA Energia Nordeste | ALAGOINHAS II | MG 230 kV ALAGOINHAS II MG2 BA | RB | FT MG 230 kV ALAGOINHAS II MG2 BA | 061/2001 | IPCA | RBNI | DSP 625/2024 | 5/19/2023 | 5/18/2041 | R$69,925.62 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura Geral de Acessante -MIG-A 230 kV na SE Alagoinhas II, em função do seccionamento da LT 230 kV Cícero Dantas - Catu C2. | |||
| AXIA Energia Nordeste | ALAGOINHAS II | MG 230 kV ALAGOINHAS II MG2 BA | RB | FT MG 230 kV ALAGOINHAS II MG2 BA | 061/2001 | IPCA | RBNI | DSP 625/2024 | 5/19/2023 | 5/18/2054 | R$22,315.36 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 230 kV na SE Alagoinhas II, em função do seccionamento da LT 230 kV Cícero Dantas - Catu C2. | |||
| AXIA Energia Nordeste | ALAGOINHAS II | EL 230 kV ALAGOINHAS II LT 230 kV OLINDINA /ALAGOINHAS II C-2 BA | RB | FT LT 230 kV OLINDINA /ALAGOINHAS II C-2 BA | 061/2001 | IPCA | RBNI | DSP 625/2024 | 5/19/2023 | 5/18/2051 | R$204,786.37 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo Barra Dupla a Quatro Chaves, na subestação Alagoinhas II, associada à Linha de Transmissão 230 kV Cícero Dantas – Alagoinhas II C1. | |||
| AXIA Energia Nordeste | ALAGOINHAS II | EL 230 kV ALAGOINHAS II LT 230 kV OLINDINA /ALAGOINHAS II C-1 BA | RB | FT LT 230 kV OLINDINA /ALAGOINHAS II C-1 BA | 061/2001 | IPCA | RBNIA | REA 12983/2022 | R$ 1,830,824.65 | 6/1/2025 | Prevista | T2022-113 | Instalar, na SE ALAGOINHAS II, um módulo de entrada de linha para o circuito LT 230 kV OLINDINA /ALAGOINHAS II C-1 BA originado do seccionamento do circuito LT 230 kV OLINDINA /CATU C-1 BA na SE ALAGOINHAS II. | ||||
| AXIA Energia Nordeste | ALAGOINHAS II | EL 230 kV ALAGOINHAS II LT 230 kV ALAGOINHAS II /CATU C-2 BA | RB | FT LT 230 kV ALAGOINHAS II /CATU C-2 BA | 061/2001 | IPCA | RBNIA | REA 12983/2022 | R$ 1,830,824.65 | 6/1/2025 | Prevista | T2022-113 | Instalar, na SE ALAGOINHAS II, um módulo de entrada de linha para o circuito LT 230 kV ALAGOINHAS II /CATU C-1 BA originado do seccionamento do circuito LT 230 kV OLINDINA /CATU C-1 BA na SE ALAGOINHAS II. | ||||
| AXIA Energia Nordeste | ALAGOINHAS II | EL 230 kV ALAGOINHAS II LT 230 kV ALAGOINHAS II /CATU C-1 BA | RB | FT LT 230 kV ALAGOINHAS II /CATU C-1 BA | 061/2001 | IPCA | RBNI | DSP 625/2024 | 5/19/2023 | 5/18/2051 | R$204,786.37 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV,arranjo Barra Dupla a Quatro Chaves, na subestação Alagoinhas II, associada à Linha de Transmissão 230 kV Alagoinhas II – Catu C1. | |||
| AXIA Energia Nordeste | ALEX | MG 230 kV ALEX MG1 CE | RB | FT MG 230 kV ALEX MG1 CE | 061/2001 | IPCA | RBNI | DSP 1183/2022 | 12/3/2021 | 12/31/2042 | R$30,740.06 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura Geral de Acessante - MIG-A 230 kV na SE Alex I. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ALEX | MG 230 kV ALEX MG1 CE | RB | FT MG 230 kV ALEX MG1 CE | 061/2001 | IPCA | RBNI | DSP 1183/2022 | 12/3/2021 | 12/31/2042 | R$31,786.84 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 3 Módulos de Infraestrutura de Manobra - MIMs 230 kV na SE Alex I, associados as entradas de linha 230 kV para a SE Mossoró II, Banabuiú e a Interligação de Barras. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ALEX | IB 230 kV MG 230 kV ALEX MG1 CE IB1 | RB | FT MG 230 kV ALEX MG1 CE | 061/2001 | IPCA | RBNI | DSP 1183/2022 | 12/3/2021 | 12/31/2042 | R$77,033.37 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Interligação de Barras - IB 230 kV na SE Alex I. *(Receita revisada em 03/07/2024) | |||
| Nova Era Ceará | ALEX | EL 230 kV ALEX LT 230 kV BANABUIU /ALEX C-2 CE | RB | FT LT 230 kV BANABUIU /ALEX C-2 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 1,121,608.44 | 6/1/2025 | Prevista | T2024-195-J | - Seccionamento da LT 230 kV Banabuiú – Mossoró II – C1 na subestação Alex | ||||
| AXIA Energia Nordeste | ALEX | EL 230 kV ALEX LT 230 kV BANABUIU /ALEX C-1 CE | RB | FT LT 230 kV BANABUIU /ALEX C-1 CE | 061/2001 | IPCA | RBNI | DSP 1183/2022 | 12/3/2021 | 12/31/2042 | R$107,243.26 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla com quatro chaves, na Subestação Alex I, associada à Linha de Transmissão 230 kV Banabuiú – Alex I C1. *(Receita revisada em 03/07/2024) | |||
| Nova Era Ceará | ALEX | EL 230 kV ALEX LT 230 kV ALEX /MOSSORO II C-2 CE/RN | RB | FT LT 230 kV ALEX /MOSSORO II C-2 CE/RN | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 1,121,608.44 | 6/1/2025 | Prevista | T2024-195-J | - Seccionamento da LT 230 kV Banabuiú – Mossoró II – C1 na subestação Alex | ||||
| AXIA Energia Nordeste | ALEX | EL 230 kV ALEX LT 230 kV ALEX /MOSSORO II C-1 CE/RN | RB | FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN | 061/2001 | IPCA | RBNI | DSP 1183/2022 | 12/3/2021 | 12/31/2042 | R$107,243.26 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla com quatro chaves, na Subestação Alex I, associada à Linha de Transmissão 230 kV Alex I – Mossoró II C1. *(Receita revisada em 03/07/2024) | |||
| Nova Era Ceará | ALEX | EL 230 kV ALEX LT 230 kV ALEX /MORADA NOVA C-1 CE | RB | FT LT 230 kV ALEX /MORADA NOVA C-1 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 1,632,950.75 | 6/1/2025 | Prevista | T2024-195-G | - LT 230 kV Alex - Morada Nova, C1, CS; | ||||
| AXIA Energia Norte | ALTAMIRA | TR 230/69 kV ALTAMIRA TR3 PA | RBF | FT TR 230/69 kV ALTAMIRA TR3 PA | 058/2001 | IPCA | RBNI | REA 4857/2014 | 12/19/2016 | 11/6/2051 | R$ 1,316,710.79 | 6/1/2025 | Ativa | T2014-064 | Instalação, na SE Altamira, do terceiro transformador trifásico TR4 230/69-13,8 KV - 60 MVA. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ALTAMIRA | TR 230/69 kV ALTAMIRA TF2 PA | RBF | FT TR 230/69 kV ALTAMIRA TF2 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$327,895.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ALTAMIRA | TR 230/69 kV ALTAMIRA TF1 PA | RBF | FT TR 230/69 kV ALTAMIRA TF1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$327,895.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ALTAMIRA | TR 230/69 kV ALTAMIRA TF1 PA | RBF | FT TR 230/69 kV ALTAMIRA TF1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$711,836.60 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ALTAMIRA | TR 230/69 kV ALTAMIRA TF1 PA | RBF | FT TR 230/69 kV ALTAMIRA TF1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$682,720.36 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ALTAMIRA | RTL 230 kV 30 Mvar ALTAMIRA RT1 PA | RB | FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$431,052.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ALTAMIRA | RTL 230 kV 30 Mvar ALTAMIRA RT1 PA | RB | FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA | 058/2001 | IPCA | RBNI | REA 4857/2014 | 12/19/2016 | 12/18/2041 | R$17,725.80 | 6/1/2025 | Ativa | T2014-064 | Instalação de uma parede corta fogo em Reator Trifásico *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ALTAMIRA | RTL 230 kV 30 Mvar ALTAMIRA RT1 PA | RB | FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$935,781.89 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ALTAMIRA | RTL 230 kV 30 Mvar ALTAMIRA RT1 PA | RB | FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$897,505.62 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ALTAMIRA | RTL 230 kV 30 Mvar ALTAMIRA RT1 PA | RB | FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 11/29/2017 | 11/28/2032 | R$11,893.28 | 6/1/2025 | Ativa | Implantacao de sistema de medicao e monitoramento online de Buchas Condensivas do equipamento ATRE601 para integrar ao SISTEMA DE SUPERVISAO SAGE Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | ALTAMIRA | RTB 230 kV 30 Mvar ALTAMIRA RT2 PA | RB | FT RTB 230 kV 30 Mvar ALTAMIRA RT2 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$274,857.33 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ALTAMIRA | MG 230 kV ALTAMIRA MG1 PA | RB | FT MG 230 kV ALTAMIRA MG1 PA | 058/2001 | IPCA | RBNI | REA 3361/2012 | 6/21/2016 | 11/9/2043 | R$49,733.69 | 6/1/2025 | Ativa | T2012-009 | d) Complemento, na SE Altamira, do Módulo Geral: Transformadores de Potencial da barra II de 230 kV; *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ALTAMIRA | MG 230 kV ALTAMIRA MG1 PA | RB | FT MG 230 kV ALTAMIRA MG1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$547,705.09 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ALTAMIRA | MG 230 kV ALTAMIRA MG1 PA | RB | FT MG 230 kV ALTAMIRA MG1 PA | 058/2001 | IPCA | RBNI | REA 4857/2014 | 12/19/2016 | 11/10/2044 | R$570,747.95 | 6/1/2025 | Ativa | T2014-064 | Complementação, na SE Altamira, do módulo de infraestrutura geral 230 kV, arranjo barra dupla a quatro chaves. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ALTAMIRA | MG 230 kV ALTAMIRA MG1 PA | RB | FT MG 230 kV ALTAMIRA MG1 PA | 058/2001 | IPCA | RBNI | REA 4857/2014 | 12/19/2016 | 12/27/2045 | R$184,742.46 | 6/1/2025 | Ativa | T2014-064 | Complementação, na SE Altamira, do módulo de infraestrutura geral 230 kV com a instalação de um módulo de infraestrutura de manobra 230 kV, arranjo barra barra dupla a quatro chaves *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ALTAMIRA | MG 230 kV ALTAMIRA MG1 PA | RB | FT MG 230 kV ALTAMIRA MG1 PA | 058/2001 | IPCA | RBNI | REA 4857/2014 | 12/19/2016 | 9/5/2044 | R$107,026.79 | 6/1/2025 | Ativa | T2014-064 | Complementação, na SE Altamira, de dois módulos de infraestrutura geral 69 kV com a instalação de um módulo de infraestrutura de manobra 69 kV, arranjo barra principal e transferência (Vãos D e E). *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ALTAMIRA | MG 230 kV ALTAMIRA MG1 PA | RB | FT MG 230 kV ALTAMIRA MG1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,189,025.97 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ALTAMIRA | MG 230 kV ALTAMIRA MG1 PA | RB | FT MG 230 kV ALTAMIRA MG1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,140,391.27 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ALTAMIRA | MG 230 kV ALTAMIRA MG1 PA | RB | FT MG 230 kV ALTAMIRA MG1 PA | 058/2001 | IPCA | RBNI | REN 443/2011 | 10/1/2018 | 1/21/2047 | R$58,668.13 | 6/1/2025 | Ativa | Instalação de Módulo de Infraestrutura de Manobra 69 kV para a Entrada de Linha 69 kV - LT Celpa C2 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 – 2020. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | ALTAMIRA | MG 230 kV ALTAMIRA MG1 PA | RB | FT MG 230 kV ALTAMIRA MG1 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 7/8/2017 | 2/4/2041 | R$56,241.08 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | ALTAMIRA | MC 69 kV TR 230/69 kV ALTAMIRA TR3 PA | RBF | FT TR 230/69 kV ALTAMIRA TR3 PA | 058/2001 | IPCA | RBNI | REA 4857/2014 | 12/19/2016 | 7/8/2047 | R$431,221.96 | 6/1/2025 | Ativa | T2014-064 | Instalação, na SE ALTAMIRA, de um módulo de conexão, em 69 kV, para a transformação TR 230/69 kV ALTAMIRA TR3 PA. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ALTAMIRA | MC 69 kV TR 230/69 kV ALTAMIRA TF2 PA | RBF | FT TR 230/69 kV ALTAMIRA TF2 PA | 058/2001 | IPCA | RBNI | REA 3361/2012 | 6/21/2016 | 7/4/2046 | R$279,091.51 | 6/1/2025 | Ativa | T2012-009 | j) Adequação, na SE Altamira, do módulo de conexão de transformador em 69 kV, referente ao 2º Transformador trifásico – 230/69-13,8 kV, 60 MVA, para o arranjo barra principal e transferência; *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ALTAMIRA | MC 69 kV TR 230/69 kV ALTAMIRA TF2 PA | RBF | FT TR 230/69 kV ALTAMIRA TF2 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$66,931.92 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ALTAMIRA | MC 69 kV TR 230/69 kV ALTAMIRA TF1 PA | RBF | FT TR 230/69 kV ALTAMIRA TF1 PA | 058/2001 | IPCA | RBNI | REA 3361/2012 | 7/11/2016 | 5/3/2046 | R$426,505.62 | 6/1/2025 | Ativa | T2012-009 | i) Intalação, na SE Altamira, do módulo de conexão de transformador em 69 kV, referente ao 1º Transformador trifásico – 230/69-13,8 kV, 60 MVA, para o arranjo barra principal e transferência; *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ALTAMIRA | MC 230 kV TR 230/69 kV ALTAMIRA TR3 PA | RBF | FT TR 230/69 kV ALTAMIRA TR3 PA | 058/2001 | IPCA | RBNI | REA 4857/2014 | 12/19/2016 | 7/30/2047 | R$ 1,020,928.23 | 6/1/2025 | Ativa | T2014-064 | Instalação, na SE ALTAMIRA, de um módulo de conexão, em 230 kV, para a transformação TR 230/69 kV ALTAMIRA TR3 PA. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ALTAMIRA | MC 230 kV TR 230/69 kV ALTAMIRA TF2 PA | RBF | FT TR 230/69 kV ALTAMIRA TF2 PA | 058/2001 | IPCA | RBNI | REA 3361/2012 | 6/21/2016 | 1/4/2048 | R$611,327.71 | 6/1/2025 | Ativa | T2012-009 | SE Altamira - Adequação dos setores 69 kV e 230 kV *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ALTAMIRA | MC 230 kV TR 230/69 kV ALTAMIRA TF2 PA | RBF | FT TR 230/69 kV ALTAMIRA TF2 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$164,434.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ALTAMIRA | MC 230 kV TR 230/69 kV ALTAMIRA TF1 PA | RBF | FT TR 230/69 kV ALTAMIRA TF1 PA | 058/2001 | IPCA | RBNI | REA 3361/2012 | 7/11/2016 | 4/7/2046 | R$ 1,062,283.57 | 6/1/2025 | Ativa | T2012-009 | SE Altamira - Adequação dos setores 69 kV e 230 kV *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ALTAMIRA | MC 230 kV TR 230/69 kV ALTAMIRA TF1 PA | RBF | FT TR 230/69 kV ALTAMIRA TF1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$164,434.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ALTAMIRA | MC 230 kV TR 230/69 kV ALTAMIRA TF1 PA | RBF | FT TR 230/69 kV ALTAMIRA TF1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$356,974.31 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ALTAMIRA | MC 230 kV RTL 230 kV 30 Mvar ALTAMIRA RT1 PA | RB | FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$109,485.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ALTAMIRA | MC 230 kV RTB 230 kV 30 Mvar ALTAMIRA RT2 PA | RB | FT RTB 230 kV 30 Mvar ALTAMIRA RT2 PA | 058/2001 | IPCA | RBNI | REA 3361/2012 | 6/21/2016 | 8/26/2047 | R$390,080.30 | 6/1/2025 | Ativa | T2012-009 | c)Adequação, na SE Altamira, do Módulo de conexão 230 kV, arranjo barra dupla a 4 chaves, referente ao Reator de Barra trifásico – 230 kV, 30 MVAr;*(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ALTAMIRA | MC 230 kV RTB 230 kV 30 Mvar ALTAMIRA RT2 PA | RB | FT RTB 230 kV 30 Mvar ALTAMIRA RT2 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$149,465.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ALTAMIRA | IB 69 kV MG 230 kV ALTAMIRA MG1 PA IB1 | DIT | 058/2001 | IPCA | RCDM | REA 3361/2012 | 6/21/2016 | 5/8/2049 | R$315,546.91 | 6/1/2025 | Ativa | T2012-009 | h) Instalação, na SE Altamira, de um módulo de interligação de barras de 69 kV, arranjo barra principal e transferência;*(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | ALTAMIRA | IB 230 kV MG 230 kV ALTAMIRA MG1 PA IB1 | RB | FT MG 230 kV ALTAMIRA MG1 PA | 058/2001 | IPCA | RBNI | REA 3361/2012 | 6/21/2016 | 4/14/2050 | R$801,903.83 | 6/1/2025 | Ativa | T2012-009 | g) Instalação, na SE Altamira, de um módulo de interligação de barras, em 230 kV, arranjo barra dupla a quatro chaves; *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ALTAMIRA | EL 69 kV ALTAMIRA DIST1 | DIT | 058/2001 | IPCA | RCDM | REA 3361/2012 | 6/21/2016 | 8/26/2046 | R$359,084.44 | 6/1/2025 | Ativa | T2012-009 | l) Adequação, na SE Altamira, da entrada de linha em 69 kV, referente à linha CELPA C1, para o arranjo barra principal e transferência; *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | ALTAMIRA | EL 69 kV ALTAMIRA DIST1 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$82,599.24 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | ALTAMIRA | EL 69 kV ALTAMIRA DIST1 | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$179,316.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | ALTAMIRA | EL 69 kV ALTAMIRA CELPA C2 | DIT | 058/2001 | IPCA | RCDM | REN 443/2011 | 10/1/2018 | 1/26/2048 | R$597,115.52 | 6/1/2025 | Ativa | Instalação de Módulo de Entrada de Linha 69 kV - LT Celpa C2 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 – 2020. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020. *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Norte | ALTAMIRA | EL 230 kV ALTAMIRA LT 230 kV TUCURUI /ALTAMIRA C-1 PA | RB | FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA | 058/2001 | IPCA | RBNI | REA 3361/2012 | 6/21/2016 | 3/29/2049 | R$497,022.22 | 6/1/2025 | Ativa | T2012-009 | Complemento, na SE Altamira, do Módulo de conexão 230 kV da Entrada de Linha Tucuruí - EL 230 kV BD4 *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ALTAMIRA | EL 230 kV ALTAMIRA LT 230 kV TUCURUI /ALTAMIRA C-1 PA | RB | FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$244,547.60 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ALTAMIRA | EL 230 kV ALTAMIRA LT 230 kV TUCURUI /ALTAMIRA C-1 PA | RB | FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$530,894.20 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ALTAMIRA | EL 230 kV ALTAMIRA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA | RB | FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA | 058/2001 | IPCA | RBNI | REA 3361/2012 | 6/21/2016 | 11/18/2045 | R$497,484.44 | 6/1/2025 | Ativa | T2012-009 | Complemento, na SE Altamira, do Módulo de conexão 230 kV da Entrada de Linha Rurópolis - EL 230 kV BD4 *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ALTAMIRA | EL 230 kV ALTAMIRA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA | RB | FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$244,547.60 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ALTAMIRA | EL 230 kV ALTAMIRA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA | RB | FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$530,894.20 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ALTAMIRA | EL 230 kV ALTAMIRA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA | RB | FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$509,179.04 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ALUMAR | EL 230 kV ALUMAR LT 230 kV SAO LUIS II /ALUMAR C-2 MA | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$253,523.26 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | ALUMAR | EL 230 kV ALUMAR LT 230 kV SAO LUIS II /ALUMAR C-2 MA | DIT | 058/2001 | IPCA | RMEL | REN 905/2020 | 9/30/2012 | 9/29/2040 | R$202,967.06 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | ALUMAR | EL 230 kV ALUMAR LT 230 kV SAO LUIS II /ALUMAR C-1 MA | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$253,523.26 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | ALUMAR | EL 230 kV ALUMAR LT 230 kV SAO LUIS II /ALUMAR C-1 MA | DIT | 058/2001 | IPCA | RMEL | REN 905/2020 | 9/30/2012 | 9/29/2040 | R$304,450.59 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | ANASTACIO | TR 230/138 kV ANASTACIO TR2 MS | RBF | FT TR 230/138 kV ANASTACIO TR2 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$280,729.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ANASTACIO | TR 230/138 kV ANASTACIO TR1 MS | RBF | FT TR 230/138 kV ANASTACIO TR1 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$280,729.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ANASTACIO | TR 230/138 kV ANASTACIO TR1 MS | RBF | FT TR 230/138 kV ANASTACIO TR1 MS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$492,702.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ANASTACIO | TR 230/138 kV ANASTACIO TR1 MS | RBF | FT TR 230/138 kV ANASTACIO TR1 MS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$417,327.60 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ANASTACIO | RTB 230 kV 27 Mvar ANASTACIO RT2 MS | RB | FT RTB 230 kV 27 Mvar ANASTACIO RT2 MS | 057/2001 | IPCA | RBNIA | DSP 4920/2023 | R$998,896.15 | 6/1/2025 | Prevista | T2023-201 | Instalação do 2º reator de barra trifásico de 27 Mvar / 230 kV na SE Anastácio | ||||
| AXIA Energia Sul | ANASTACIO | RTB 230 kV 27 Mvar ANASTACIO RT1 MS | RB | FT RTB 230 kV 27 Mvar ANASTACIO RT1 MS | 057/2001 | IPCA | RBNI | REA 10889/2021 | 11/19/2023 | 11/18/2059 | R$ 1,041,146.86 | 6/1/2025 | Ativa | T2021-080 | Instalar um módulo de equipamento - reator trifásico 27Mvar/230kV | ||
| AXIA Energia Sul | ANASTACIO | MG 230 kV ANASTACIO MG1 MS | RB | FT MG 230 kV ANASTACIO MG1 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$398,751.91 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ANASTACIO | MG 230 kV ANASTACIO MG1 MS | RB | FT MG 230 kV ANASTACIO MG1 MS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$699,842.34 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ANASTACIO | MG 230 kV ANASTACIO MG1 MS | RB | FT MG 230 kV ANASTACIO MG1 MS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$592,778.67 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ANASTACIO | MG 230 kV ANASTACIO MG1 MS | RB | FT MG 230 kV ANASTACIO MG1 MS | 057/2001 | IPCA | RBNI | REA 5861/2016 | 4/19/2018 | 4/18/2035 | R$23,236.78 | 6/1/2025 | Ativa | Instalação de 2 carregadores de baterias de 48 Vcc. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | ANASTACIO | MG 230 kV ANASTACIO MG1 MS | RB | FT MG 230 kV ANASTACIO MG1 MS | 057/2001 | IPCA | RBNI | REA 10889/2021 | 11/24/2023 | 11/23/2054 | R$173,872.64 | 6/1/2025 | Ativa | T2021-080 | Instalar um módulo de infraestrutura de manobra 230kV/BD4 na SE Anastácio | ||
| AXIA Energia Sul | ANASTACIO | MG 230 kV ANASTACIO MG1 MS | RB | FT MG 230 kV ANASTACIO MG1 MS | 057/2001 | IPCA | RBNIA | DSP 4920/2023 | R$189,006.83 | 6/1/2025 | Prevista | T2023-201 | Módulo de infraestrutura associado ao 2º reator de barra trifásico de 27 Mvar na SE Anastácio | ||||
| AXIA Energia Sul | ANASTACIO | MG 230 kV ANASTACIO MG1 MS | RB | FT MG 230 kV ANASTACIO MG1 MS | 057/2001 | IPCA | RMEL | REN 905/2020 | 10/13/2019 | 8/30/2042 | R$26,575.99 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | ANASTACIO | MC 230 kV TR 230/138 kV ANASTACIO TR2 MS | RBF | FT TR 230/138 kV ANASTACIO TR2 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ANASTACIO | MC 230 kV TR 230/138 kV ANASTACIO TR2 MS | RBF | FT TR 230/138 kV ANASTACIO TR2 MS | 057/2001 | IPCA | RBNI | REA 10889/2021 | 11/24/2023 | 11/23/2038 | R$79,588.55 | 6/1/2025 | Ativa | T2021-080 | Adequação do módulo de conexão de 230 kV (BD4) do autotransformador 2 – ATF2 230/138kV 75 MVA - sistema de proteção. | ||
| AXIA Energia Sul | ANASTACIO | MC 230 kV TR 230/138 kV ANASTACIO TR1 MS | RBF | FT TR 230/138 kV ANASTACIO TR1 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ANASTACIO | MC 230 kV TR 230/138 kV ANASTACIO TR1 MS | RBF | FT TR 230/138 kV ANASTACIO TR1 MS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$233,385.63 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ANASTACIO | MC 230 kV TR 230/138 kV ANASTACIO TR1 MS | RBF | FT TR 230/138 kV ANASTACIO TR1 MS | 057/2001 | IPCA | RBNI | REA 10889/2021 | 11/24/2023 | 11/23/2038 | R$79,588.55 | 6/1/2025 | Ativa | T2021-080 | Adequação do módulo de conexão de 230 kV (BD4) do autotransformador 1 – ATF1 230/138kV 75 MVA - sistema de proteção. | ||
| AXIA Energia Sul | ANASTACIO | MC 230 kV RTB 230 kV 27 Mvar ANASTACIO RT2 MS | RB | FT RTB 230 kV 27 Mvar ANASTACIO RT2 MS | 057/2001 | IPCA | RBNIA | DSP 4920/2023 | R$ 1,653,736.44 | 6/1/2025 | Prevista | T2023-201 | Conexão de Reator de Barra 230 kV - BD4 do 2º reator de barra trifásico de 27 Mvar na SE Anastácio | ||||
| AXIA Energia Sul | ANASTACIO | MC 230 kV RTB 230 kV 27 Mvar ANASTACIO RT1 MS | RB | FT RTB 230 kV 27 Mvar ANASTACIO RT1 MS | 057/2001 | IPCA | RBNI | REA 10889/2021 | 11/19/2023 | 11/18/2052 | R$ 1,610,849.21 | 6/1/2025 | Ativa | T2021-080 | Instalar um módulo de manobra - conexão de reator de barra 230KV/BD4 na SE Anastácio | ||
| AXIA Energia Sul | ANASTACIO | MC 138 kV TR 230/138 kV ANASTACIO TR2 MS | RBF | FT TR 230/138 kV ANASTACIO TR2 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$89,047.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ANASTACIO | MC 138 kV TR 230/138 kV ANASTACIO TR1 MS | RBF | FT TR 230/138 kV ANASTACIO TR1 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$89,047.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ANASTACIO | MC 138 kV TR 230/138 kV ANASTACIO TR1 MS | RBF | FT TR 230/138 kV ANASTACIO TR1 MS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$156,285.32 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ANASTACIO | IB 230 kV MG 230 kV ANASTACIO MG1 MS IB1 | RB | FT MG 230 kV ANASTACIO MG1 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,146.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ANASTACIO | IB 230 kV MG 230 kV ANASTACIO MG1 MS IB1 | RB | FT MG 230 kV ANASTACIO MG1 MS | 057/2001 | IPCA | RBNI | REA 10889/2021 | 11/24/2023 | 11/23/2038 | R$224,763.68 | 6/1/2025 | Ativa | T2021-080 | Adequação do módulo de manobra - interligação de barras 230KV/BD4 - sistema de proteção | ||
| AXIA Energia Sul | ANASTACIO | EL 230 kV ANASTACIO LT 230 kV ANASTACIO /DOURADOS C-1 MS | RB | FT LT 230 kV ANASTACIO /DOURADOS C-1 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ANASTACIO | EL 230 kV ANASTACIO LT 230 kV ANASTACIO /DOURADOS C-1 MS | RB | FT LT 230 kV ANASTACIO /DOURADOS C-1 MS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$331,586.21 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ANASTACIO | EL 230 kV ANASTACIO LT 230 kV ANASTACIO /DOURADOS C-1 MS | RB | FT LT 230 kV ANASTACIO /DOURADOS C-1 MS | 057/2001 | IPCA | RBNI | REA 10889/2021 | 11/24/2023 | 11/23/2038 | R$85,327.26 | 6/1/2025 | Ativa | T2021-080 | Adequação do módulo de entrada de linha Dourados de 230 kV/BD4 - sistema de proteção. | ||
| AXIA Energia Nordeste | ANGELIM | TT 69/13,8 kV ANGELIM TA2 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | TT 69/13,8 kV ANGELIM TA2 PE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$248,222.69 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | TT 69/13,8 kV ANGELIM TA2 PE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$228,831.00 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | TT 69/13,8 kV ANGELIM TA1 PE | DIT | 061/2001 | IPCA | RCDM | REA 3578/2012 | 11/27/2015 | 7/25/2046 | R$181,932.91 | 6/1/2025 | Ativa | Obra de Substituição Completa - Substituição de 1 transformador de aterramento: 02A1. INCLUIDA NO CICLO 2016/2017 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ANGELIM | TR 69/13,8 kV ANGELIM TR4B PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | TR 69/13,8 kV ANGELIM TR4B PE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$76,466.27 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | TR 69/13,8 kV ANGELIM TR4A PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | TR 230/69 kV ANGELIM TR6 PE | RBF | FT TR 230/69 kV ANGELIM TR6 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | TR 230/69 kV ANGELIM TR5 PE | RBF | FT TR 230/69 kV ANGELIM TR5 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | TR 230/69 kV ANGELIM TR5 PE | RBF | FT TR 230/69 kV ANGELIM TR5 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | TR 230/69 kV ANGELIM TR5 PE | RBF | FT TR 230/69 kV ANGELIM TR5 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$913,997.96 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | TR 230/69 kV ANGELIM TR5 PE | RBF | FT TR 230/69 kV ANGELIM TR5 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/16/2022 | 11/23/2057 | R$ 602.46 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM | TR 230/69 kV ANGELIM TR3 PE | RBF | FT TR 230/69 kV ANGELIM TR3 PE | 061/2001 | IPCA | RMEL | REA 9918/2021 | 12/5/2022 | 11/12/2057 | R$ 2,264,224.56 | 6/1/2025 | Ativa | T2020-006 | Obra de Substituição Completa - Substituição do transformador trifásico TR3 230/69 kV - 100 MVA da Subestação Angelim. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | ANGELIM | MG 230 kV ANGELIM MG1 PE | RB | FT MG 230 kV ANGELIM MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$755,269.41 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | MG 230 kV ANGELIM MG1 PE | RB | FT MG 230 kV ANGELIM MG1 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/24/2015 | 7/23/2030 | R$29,517.20 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SWITCH.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM | MG 230 kV ANGELIM MG1 PE | RB | FT MG 230 kV ANGELIM MG1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,119,413.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | MG 230 kV ANGELIM MG1 PE | RB | FT MG 230 kV ANGELIM MG1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,953,840.36 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | MG 230 kV ANGELIM MG1 PE | RB | FT MG 230 kV ANGELIM MG1 PE | 061/2001 | IPCA | RMEL | REN 443/2011 | 4/1/2016 | 3/31/2031 | R$43,361.40 | 6/1/2025 | Ativa | Revitalização Necessária: Implantação de Switches Industriais * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM | MG 230 kV ANGELIM MG1 PE | RB | FT MG 230 kV ANGELIM MG1 PE | 061/2001 | IPCA | RMEL | REN 443/2011 | 8/4/2016 | 8/3/2033 | R$7,105.28 | 6/1/2025 | Ativa | Implantação de Banco de Baterias * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM | MG 230 kV ANGELIM MG1 PE | RB | FT MG 230 kV ANGELIM MG1 PE | 061/2001 | IPCA | RMEL | REN 443/2011 | 7/18/2016 | 7/21/2046 | R$3,493.68 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM | MG 230 kV ANGELIM MG1 PE | RB | FT MG 230 kV ANGELIM MG1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/28/2021 | 12/17/2041 | R$460,881.12 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM | MC 69 kV TT 69/13,8 kV ANGELIM TA2 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | MC 69 kV TT 69/13,8 kV ANGELIM TA1 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | MC 69 kV TR 69/13,8 kV ANGELIM TR4A PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | MC 69 kV TR 69/13,8 kV ANGELIM TR4A PE | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/26/2015 | 10/25/2030 | R$4,128.16 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32T4-4/5.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ANGELIM | MC 69 kV TR 69/13,8 kV ANGELIM TR4A PE | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/27/2015 | 10/26/2030 | R$1,982.67 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32T4-6.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ANGELIM | MC 69 kV TR 230/69 kV ANGELIM TR6 PE | RBF | FT TR 230/69 kV ANGELIM TR6 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | MC 69 kV TR 230/69 kV ANGELIM TR5 PE | RBF | FT TR 230/69 kV ANGELIM TR5 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | MC 69 kV TR 230/69 kV ANGELIM TR5 PE | RBF | FT TR 230/69 kV ANGELIM TR5 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | MC 69 kV TR 230/69 kV ANGELIM TR3 PE | RBF | FT TR 230/69 kV ANGELIM TR3 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | MC 69 kV TR 230/69 kV ANGELIM TR3 PE | RBF | FT TR 230/69 kV ANGELIM TR3 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | MC 69 kV TR 230/69 kV ANGELIM TR3 PE | RBF | FT TR 230/69 kV ANGELIM TR3 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$162,185.50 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | MC 230 kV TR 230/69 kV ANGELIM TR6 PE | RBF | FT TR 230/69 kV ANGELIM TR6 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | MC 230 kV TR 230/69 kV ANGELIM TR5 PE | RBF | FT TR 230/69 kV ANGELIM TR5 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | MC 230 kV TR 230/69 kV ANGELIM TR5 PE | RBF | FT TR 230/69 kV ANGELIM TR5 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$454,511.36 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | MC 230 kV TR 230/69 kV ANGELIM TR5 PE | RBF | FT TR 230/69 kV ANGELIM TR5 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/25/2019 | 6/21/2047 | R$84,703.81 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM | MC 230 kV TR 230/69 kV ANGELIM TR3 PE | RBF | FT TR 230/69 kV ANGELIM TR3 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | MC 230 kV TR 230/69 kV ANGELIM TR3 PE | RBF | FT TR 230/69 kV ANGELIM TR3 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$454,511.36 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | MC 230 kV TR 230/69 kV ANGELIM TR3 PE | RBF | FT TR 230/69 kV ANGELIM TR3 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/5/2020 | 3/8/2050 | R$62,609.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM | MC 13,8 kV TR 69/13,8 kV ANGELIM TR4A PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | MC 13,8 kV TR 69/13,8 kV ANGELIM TR4A PE | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/16/2014 | 3/15/2047 | R$25,778.37 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | ANGELIM | IB 69 kV MG 230 kV ANGELIM MG1 PE IB3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | IB 69 kV MG 230 kV ANGELIM MG1 PE IB3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$118,244.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | IB 69 kV MG 230 kV ANGELIM MG1 PE IB3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$109,007.13 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | IB 69 kV MG 230 kV ANGELIM MG1 PE IB3 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/30/2014 | 9/29/2047 | R$55,181.21 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | ANGELIM | IB 230 kV MG 230 kV ANGELIM MG1 PE IB2 | RB | FT MG 230 kV ANGELIM MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,085.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | IB 230 kV MG 230 kV ANGELIM MG1 PE IB1 | RB | FT MG 230 kV ANGELIM MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,085.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | IB 230 kV MG 230 kV ANGELIM MG1 PE IB1 | RB | FT MG 230 kV ANGELIM MG1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$373,459.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST8 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST8 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/26/2015 | 10/25/2030 | R$5,688.31 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J6-4/5/6.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST8 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST8 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST7 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST7 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/22/2015 | 10/21/2030 | R$7,751.04 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J5-4/5/6/7.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST7 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST7 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST6 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST6 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/19/2015 | 10/18/2030 | R$7,574.58 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J1-4/5/6/7.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST6 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 6/13/2016 | 6/12/2040 | R$2,048.35 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE PARARAIOS, POSIÇÃO 72J7 FASE A DA SUB ANGELIM * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST6 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 6/12/2016 | 6/11/2040 | R$2,048.12 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE PARARAIOS, POSIÇÃO 72J7 FASES B DA SUB ANGELIM * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST6 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 6/12/2016 | 6/11/2040 | R$2,048.12 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE PARARAIOS, POSIÇÃO 72J7 FASE C DA SUB ANGELIM * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST5 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/2/2016 | 5/1/2031 | R$1,849.50 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST4 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/21/2015 | 10/20/2030 | R$7,577.39 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J7-4/5/6/7.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST3 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/24/2015 | 10/23/2030 | R$3,790.80 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J4-4/5.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST3 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/27/2015 | 10/26/2030 | R$1,896.45 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J4-6.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST2 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/27/2015 | 10/26/2030 | R$1,896.45 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J3-6.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST2 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/23/2015 | 10/22/2030 | R$3,790.10 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J3-4/5.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/10/2020 | 3/9/2044 | R$7,523.79 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | EL 69 kV ANGELIM DIST1 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/20/2015 | 10/19/2030 | R$7,662.08 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J2-4/5/6/7.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV SANTANA II /ANGELIM C-1 AL/PE | RB | FT LT 230 kV SANTANA II /ANGELIM C-1 AL/PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV SANTANA II /ANGELIM C-1 AL/PE | RB | FT LT 230 kV SANTANA II /ANGELIM C-1 AL/PE | 061/2001 | IPCA | RBNI | REA 2837/2011 | 3/20/2015 | 3/22/2045 | R$38,100.11 | 6/1/2025 | Ativa | Substituição dos TCs 94L1-A, 94L1-B e 94L1-C.Incluído no reajuste ciclo 2015-2016 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV SANTANA II /ANGELIM C-1 AL/PE | RB | FT LT 230 kV SANTANA II /ANGELIM C-1 AL/PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV SANTANA II /ANGELIM C-1 AL/PE | RB | FT LT 230 kV SANTANA II /ANGELIM C-1 AL/PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/4/2018 | 5/6/2048 | R$34,784.54 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV GARANHUNS II /ANGELIM C-3 PE | RB | FT LT 230 kV GARANHUNS II /ANGELIM C-3 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV GARANHUNS II /ANGELIM C-3 PE | RB | FT LT 230 kV GARANHUNS II /ANGELIM C-3 PE | 061/2001 | IPCA | RBNI | REA 2837/2011 | 4/14/2015 | 4/16/2045 | R$38,188.82 | 6/1/2025 | Ativa | Substituição dos TCs 94L4-A, 94L4-B e 94L4-C.Incluído no reajuste ciclo 2015-2016 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV GARANHUNS II /ANGELIM C-2 PE | RB | FT LT 230 kV GARANHUNS II /ANGELIM C-2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV GARANHUNS II /ANGELIM C-1 PE | RB | FT LT 230 kV GARANHUNS II /ANGELIM C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV GARANHUNS II /ANGELIM C-1 PE | RB | FT LT 230 kV GARANHUNS II /ANGELIM C-1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2021 | 1/4/2051 | R$56,449.80 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-3 PE | RB | FT LT 230 kV ANGELIM /TACAIMBO C-3 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-3 PE | RB | FT LT 230 kV ANGELIM /TACAIMBO C-3 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-3 PE | RB | FT LT 230 kV ANGELIM /TACAIMBO C-3 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$584,375.21 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-3 PE | RB | FT LT 230 kV ANGELIM /TACAIMBO C-3 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/20/2020 | 4/19/2035 | R$47,534.92 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-2 PE | RB | FT LT 230 kV ANGELIM /TACAIMBO C-2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-2 PE | RB | FT LT 230 kV ANGELIM /TACAIMBO C-2 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-2 PE | RB | FT LT 230 kV ANGELIM /TACAIMBO C-2 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$584,375.21 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-2 PE | RB | FT LT 230 kV ANGELIM /TACAIMBO C-2 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/13/2020 | 7/25/2041 | R$73,163.30 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-1 PE | RB | FT LT 230 kV ANGELIM /TACAIMBO C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-1 PE | RB | FT LT 230 kV ANGELIM /TACAIMBO C-1 PE | 061/2001 | IPCA | RBNI | REA 2837/2011 | 4/30/2015 | 5/2/2045 | R$38,245.60 | 6/1/2025 | Ativa | Substituição dos TCs 94M3-A, 94M3-B e 94M3-C.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-1 PE | RB | FT LT 230 kV ANGELIM /TACAIMBO C-1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-1 PE | RB | FT LT 230 kV ANGELIM /TACAIMBO C-1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$584,375.21 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /RIBEIRAO C-2 PE | RB | FT LT 230 kV ANGELIM /RIBEIRAO C-2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /RIBEIRAO C-2 PE | RB | FT LT 230 kV ANGELIM /RIBEIRAO C-2 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /RIBEIRAO C-2 PE | RB | FT LT 230 kV ANGELIM /RIBEIRAO C-2 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$584,375.21 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /RIBEIRAO C-1 PE | RB | FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /RIBEIRAO C-1 PE | RB | FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /RECIFE II C-1 PE | RB | FT LT 230 kV ANGELIM /RECIFE II C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /RECIFE II C-1 PE | RB | FT LT 230 kV ANGELIM /RECIFE II C-1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /RECIFE II C-1 PE | RB | FT LT 230 kV ANGELIM /RECIFE II C-1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$584,375.21 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /RECIFE II C-1 PE | RB | FT LT 230 kV ANGELIM /RECIFE II C-1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/28/2018 | 11/30/2048 | R$53,090.64 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-3 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-3 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-3 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL | 061/2001 | IPCA | RMEL | REN 443/2011 | 6/2/2016 | 6/5/2046 | R$1,748.74 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-3 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/9/2021 | 4/25/2050 | R$129,236.79 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-2 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-2 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL | 061/2001 | IPCA | RBNI | REA 2837/2011 | 3/26/2015 | 3/28/2045 | R$38,121.39 | 6/1/2025 | Ativa | Substituição dos TCs 94M8-A, 94M8-B e 94M8-C.Incluído no reajuste ciclo 2015-2016 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-2 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-2 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL | 061/2001 | IPCA | RMEL | REN 443/2011 | 4/29/2016 | 5/2/2046 | R$1,763.16 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-2 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/4/2017 | 8/7/2047 | R$19,299.05 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-1 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-1 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL | 061/2001 | IPCA | RBNI | REA 2837/2011 | 3/13/2015 | 3/15/2045 | R$25,383.51 | 6/1/2025 | Ativa | Substituição dos TCs 94M7-A e 94M7-B.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM | EL 13,8 kV ANGELIM PALMERINA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ANGELIM | EL 13,8 kV ANGELIM PALMERINA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/20/2014 | 5/19/2047 | R$25,924.50 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | ANGELIM | EL 13,8 kV ANGELIM AUXIL2 | RB | FT MG 230 kV ANGELIM MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 13,8 kV ANGELIM AUXIL2 | RB | FT MG 230 kV ANGELIM MG1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/21/2013 | 4/20/2046 | R$25,038.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM | EL 13,8 kV ANGELIM AUXIL1 | RB | FT MG 230 kV ANGELIM MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM | EL 13,8 kV ANGELIM AUXIL1 | RB | FT MG 230 kV ANGELIM MG1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/21/2013 | 4/20/2046 | R$25,038.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM II | RTL 500 kV 150 Mvar ANGELIM II RT3 PE | RB | FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$773,925.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM II | RTL 500 kV 150 Mvar ANGELIM II RT3 PE | RB | FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,171,764.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM II | RTL 500 kV 150 Mvar ANGELIM II RT3 PE | RB | FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE | 061/2001 | IPCA | RMELP | REA 14107/2023 | R$ 2,775,082.03 | 6/1/2025 | Prevista | T2023-056 | Obra de Substituição Completa - Substituição de 3 (três) Reatores monofásicos, fases A, B e C, potência 50 MVAr cada, posição operacional 05E3, da Subestação AGD. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 0001394/2022 | ||||
| AXIA Energia Nordeste | ANGELIM II | RTL 500 kV 150 Mvar ANGELIM II RT2 PE | RB | FT LT 230 kV GARANHUNS II /ANGELIM C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$773,925.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM II | RTL 500 kV 150 Mvar ANGELIM II RT2 PE | RB | FT LT 230 kV GARANHUNS II /ANGELIM C-1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,171,764.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM II | RTL 500 kV 150 Mvar ANGELIM II RT2 PE | RB | FT LT 230 kV GARANHUNS II /ANGELIM C-1 PE | 061/2001 | IPCA | RMELP | REA 14107/2023 | R$ 2,775,082.03 | 6/1/2025 | Prevista | T2023-057 | Obra de Substituição Completa - Substituição de 3 (três) Reatores monofásicos, fases A, B e C, potência 50 MVAr cada, posição operacional 05E2, da Subestação AGD. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 0001393/2022 | ||||
| AXIA Energia Nordeste | ANGELIM II | RTB 500 kV 50 Mvar ANGELIM II RTR1 PE | RB | FT RTB 500 kV 50 MVAr ANGELIM II RTR1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$257,975.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM II | RTB 500 kV 50 Mvar ANGELIM II RTR1 PE | RB | FT RTB 500 kV 50 MVAr ANGELIM II RTR1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$723,921.48 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM II | RTB 500 kV 50 Mvar ANGELIM II RTR1 PE | RB | FT RTB 500 kV 50 MVAr ANGELIM II RTR1 PE | 061/2001 | IPCA | RMELP | REA 14107/2023 | R$925,027.34 | 6/1/2025 | Prevista | T2023-055 | Obra de Substituição Completa - Substituição de 1 (um) Reator monofásico, potência 50 MVAr, posição operacional 05ER, da Subestação AGD. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 0001418/2022 | ||||
| AXIA Energia Nordeste | ANGELIM II | RTB 500 kV 50 Mvar ANGELIM II RTR1 PE | RB | FT RTB 500 kV 50 MVAr ANGELIM II RTR1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/7/2021 | 12/6/2045 | R$18,196.29 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM II | RTB 500 kV 150 Mvar ANGELIM II RT5 PE | RB | FT RTB 500 kV 150 Mvar ANGELIM II RT5 PE | 061/2001 | IPCA | RBNIA | REA 10091/2021 | R$ 1,977,867.69 | 6/1/2025 | Prevista | T2021-026 | Instalar na SE Angelim II 500 kV o segundo banco de reatores de barra, 3x50MVar. | ||||
| AXIA Energia Nordeste | ANGELIM II | RTB 500 kV 150 Mvar ANGELIM II RT1 PE | RB | FT RTB 500 kV 150 MVAr ANGELIM II RT1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$773,925.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM II | MG 500 kV ANGELIM II MG1 PE | RB | FT MG 500 kV ANGELIM II MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,197,194.69 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM II | MG 500 kV ANGELIM II MG1 PE | RB | FT MG 500 kV ANGELIM II MG1 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/17/2015 | 12/16/2032 | R$17,524.75 | 6/1/2025 | Ativa | Revitalização Necessária: SUBSTITUIÇÃO DAS BATERIAS SATURNIA 6OPZS400 125VCC, 800A1 E 800A2 .Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM II | MG 500 kV ANGELIM II MG1 PE | RB | FT MG 500 kV ANGELIM II MG1 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/24/2015 | 7/23/2043 | R$45,099.15 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SWITCH.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM II | MG 500 kV ANGELIM II MG1 PE | RB | FT MG 500 kV ANGELIM II MG1 PE | 061/2001 | IPCA | RBNI | REA 7761/2019 | 11/30/2021 | 11/29/2049 | R$158,811.23 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DA UTR * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM II | MG 500 kV ANGELIM II MG1 PE | RB | FT MG 500 kV ANGELIM II MG1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/11/2020 | 9/17/2042 | R$224,064.45 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM II | MC 500 kV RTL 500 kV 150 Mvar ANGELIM II RT3 PE | RB | FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$251,123.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM II | MC 500 kV RTL 500 kV 150 Mvar ANGELIM II RT3 PE | RB | FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/23/2022 | 1/22/2046 | R$54,823.23 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM II | MC 500 kV RTL 500 kV 150 Mvar ANGELIM II RT2 PE | RB | FT LT 230 kV GARANHUNS II /ANGELIM C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$251,123.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM II | MC 500 kV RTL 500 kV 150 Mvar ANGELIM II RT2 PE | RB | FT LT 230 kV GARANHUNS II /ANGELIM C-1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/18/2022 | 1/17/2046 | R$54,798.30 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM II | MC 500 kV RTB 500 kV 150 Mvar ANGELIM II RT5 PE | RB | FT RTB 500 kV 150 Mvar ANGELIM II RT5 PE | 061/2001 | IPCA | RBNIA | REA 10091/2021 | R$ 1,473,014.05 | 6/1/2025 | Prevista | T2021-026 | Instalação de conexão do segundo reator de barra 500KV - RT5. | ||||
| AXIA Energia Nordeste | ANGELIM II | MC 500 kV RTB 500 kV 150 Mvar ANGELIM II RT1 PE | RB | FT RTB 500 kV 150 MVAr ANGELIM II RT1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$388,096.61 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM II | MC 500 kV RTB 500 kV 150 Mvar ANGELIM II RT1 PE | RB | FT RTB 500 kV 150 MVAr ANGELIM II RT1 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 2/2/2013 | 2/5/2043 | R$28,863.89 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC TIPO AKOF 500 DE FABRICAÇAO SIEMENS, 95E1-1 FASES B e C. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM II | MC 500 kV RTB 500 kV 150 Mvar ANGELIM II RT1 PE | RB | FT RTB 500 kV 150 MVAr ANGELIM II RT1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/12/2021 | 12/11/2049 | R$3,604.36 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM II | IB 500 kV MG 500 kV ANGELIM II MG1 PE IB2 | RB | FT MG 500 kV ANGELIM II MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$439,875.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM II | IB 500 kV MG 500 kV ANGELIM II MG1 PE IB2 | RB | FT MG 500 kV ANGELIM II MG1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/8/2021 | 12/7/2054 | R$188,856.71 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM II | IB 500 kV MG 500 kV ANGELIM II MG1 PE IB1 | RB | FT MG 500 kV ANGELIM II MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$439,875.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM II | IB 500 kV MG 500 kV ANGELIM II MG1 PE IB1 | RB | FT MG 500 kV ANGELIM II MG1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/10/2021 | 2/4/2054 | R$255,962.14 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM II | EL 500 kV ANGELIM II LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE | RB | FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$469,641.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM II | EL 500 kV ANGELIM II LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE | RB | FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/18/2020 | 9/16/2044 | R$493,320.02 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM II | EL 500 kV ANGELIM II LT 500 kV GARANHUNS II /ANGELIM II C-1 PE | RB | FT LT 500 kV GARANHUNS II /ANGELIM II C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$469,641.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM II | EL 500 kV ANGELIM II LT 500 kV GARANHUNS II /ANGELIM II C-1 PE | RB | FT LT 500 kV GARANHUNS II /ANGELIM II C-1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/8/2020 | 11/5/2047 | R$359,122.72 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM II | EL 500 kV ANGELIM II LT 500 kV ANGELIM II /SUAPE II C-1 PE | RB | FT LT 500 kV ANGELIM II /SUAPE II C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$469,641.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM II | EL 500 kV ANGELIM II LT 500 kV ANGELIM II /SUAPE II C-1 PE | RB | FT LT 500 kV ANGELIM II /SUAPE II C-1 PE | 061/2001 | IPCA | RBNI | REA 8328/2019 | 5/26/2025 | 5/25/2054 | R$259,076.90 | 6/1/2025 | Ativa | T2019-073 | Adequações das proteções, na SE Angelim II, na EL para Recife II, em função do seccionamento da LT 500 kV Angelim II - Recife II na SE Suape II. | ||
| AXIA Energia Nordeste | ANGELIM II | EL 500 kV ANGELIM II LT 500 kV ANGELIM II /SUAPE II C-1 PE | RB | FT LT 500 kV ANGELIM II /SUAPE II C-1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/11/2022 | 5/12/2052 | R$374,091.20 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM II | EL 500 kV ANGELIM II LT 500 kV ANGELIM II /PAU FERRO C-1 PE | RB | FT LT 500 kV ANGELIM II /PAU FERRO C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$469,641.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ANGELIM II | EL 500 kV ANGELIM II LT 500 kV ANGELIM II /PAU FERRO C-1 PE | RB | FT LT 500 kV ANGELIM II /PAU FERRO C-1 PE | 061/2001 | IPCA | RBNI | REA 5861/2016 | 6/8/2016 | 6/7/2044 | R$21,332.35 | 6/1/2025 | Ativa | EL 500 kV ANGELIM II LT 500 kV ANGELIM II /PAU FERRO C-1 PE * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ANGELIM II | EL 500 kV ANGELIM II LT 500 kV ANGELIM II /PAU FERRO C-1 PE | RB | FT LT 500 kV ANGELIM II /PAU FERRO C-1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/15/2021 | 12/19/2051 | R$434,161.88 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ANGRA FUR | TT 13,8/0,12 kV ANGRA FUR TR58 RJ | RBF | FT TR 500/138 kV ANGRA FUR TR58 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | TR 500/138 kV ANGRA FUR TRR1 RJ | RBF | FT TR 500/138 kV ANGRA FUR TRR1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$491,806.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | TR 500/138 kV ANGRA FUR TRR1 RJ | RBF | FT TR 500/138 kV ANGRA FUR TRR1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,887,247.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | TR 500/138 kV ANGRA FUR TRR1 RJ | RBF | FT TR 500/138 kV ANGRA FUR TRR1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,023,230.35 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | TR 500/138 kV ANGRA FUR TR58 RJ | RBF | FT TR 500/138 kV ANGRA FUR TR58 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,476,766.16 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | TR 500/138 kV ANGRA FUR TR58 RJ | RBF | FT TR 500/138 kV ANGRA FUR TR58 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 5,666,908.81 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | TR 500/138 kV ANGRA FUR TR58 RJ | RBF | FT TR 500/138 kV ANGRA FUR TR58 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 6,075,229.60 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | TR 138/138 kV ANGRA FUR TRD2 RJ | RBF | FT TR 138/138 kV ANGRA FUR TRD2 RJ | 062/2001 | IPCA | RBNI | REA 4089/2013 | 7/27/2018 | 4/11/2053 | R$ 5,263,702.07 | 6/1/2025 | Ativa | T2013-030 | Instalar, na SE Angra, um transformador defasador reserva TRDR1 138/138 kV - 400 MVA.“(Receita alterada devido à alteração do perfil de plano para decrescente) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | ANGRA FUR | TR 138/138 kV ANGRA FUR TRD2 RJ | RBF | FT TR 138/138 kV ANGRA FUR TRD2 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/27/2022 | 3/26/2037 | R$837,500.01 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ANGRA FUR | TR 138/138 kV ANGRA FUR TRD1 RJ | RBF | FT TR 500/138 kV ANGRA FUR TR58 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$416,060.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | TR 138/13,8 kV ANGRA FUR TR1D RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,035.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | TR 138/13,8 kV ANGRA FUR TR1C RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,035.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | TR 138/13,8 kV ANGRA FUR TR1C RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$103,747.16 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | TR 138/13,8 kV ANGRA FUR TR1B RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,035.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | TR 138/13,8 kV ANGRA FUR TR1A RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,035.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | TR 138/13,8 kV ANGRA FUR TR1A RJ | DIT | 062/2001 | IPCA | RCDMA | DSP 4208/2023 | R$943,929.14 | 6/1/2025 | Prevista | T2023-187 | Obra de Substituição Completa - Substituição, na SE ANGRA FUR, de uma transformação trifásica TR1A 138/13,8- KV - 7,5 MVA por novo transformador 138/13,8 kV, 15 MVA (Rotina- Substituição -IdeMdl 10331). | |||||
| AXIA Energia | ANGRA FUR | RTL 500 kV 136 Mvar ANGRA FUR RT1 RJ | RB | FT RTL 500 kV 136 MVAr ANGRA FUR RT1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$715,674.32 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | MG 500 kV ANGRA FUR MG1 RJ | RB | FT MG 500 kV ANGRA FUR MG1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,803,591.06 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | MG 500 kV ANGRA FUR MG1 RJ | RB | FT MG 500 kV ANGRA FUR MG1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,921,059.23 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | MG 500 kV ANGRA FUR MG1 RJ | RB | FT MG 500 kV ANGRA FUR MG1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 7,419,746.00 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | MG 500 kV ANGRA FUR MG1 RJ | RB | FT MG 500 kV ANGRA FUR MG1 RJ | 062/2001 | IPCA | RBNIA | REA 6787/2017 | R$78,052.14 | 6/1/2025 | Prevista | T2017-068 | Complementação do MIG 500 kV para o remanejamento dos vãos de 500 kV na SE Angra. | ||||
| AXIA Energia | ANGRA FUR | MG 500 kV ANGRA FUR MG1 RJ | RB | FT MG 500 kV ANGRA FUR MG1 RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/31/2017 | 3/27/2033 | R$ 970.52 | 6/1/2025 | Ativa | Substituição de IHMs do Sistema de Supervisão e Controle Local (SAGE) por obsolescência ou por atualização tecnológica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ANGRA FUR | MG 500 kV ANGRA FUR MG1 RJ | RB | FT MG 500 kV ANGRA FUR MG1 RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/21/2016 | 8/16/2029 | R$6,657.51 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (004265/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ANGRA FUR | MG 500 kV ANGRA FUR MG1 RJ | RB | FT MG 500 kV ANGRA FUR MG1 RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/21/2016 | 8/16/2029 | R$15,485.65 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (004268/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ANGRA FUR | MG 500 kV ANGRA FUR MG1 RJ | RB | FT MG 500 kV ANGRA FUR MG1 RJ | 062/2001 | IPCA | RBNI | REA 8314/2019 | 2/11/2021 | 2/10/2036 | R$2,107.78 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000360/2014 (FT: LT 500 kV ANGRA FUR / C. PAULISTA C 1 RJ/SP) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ANGRA FUR | MG 500 kV ANGRA FUR MG1 RJ | RB | FT MG 500 kV ANGRA FUR MG1 RJ | 062/2001 | IPCA | RBNI | REA 8314/2019 | 2/11/2021 | 2/10/2036 | R$2,107.77 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000381/2014 (FT: LT 500 kV ANGRA FUR /NOVA IGUACU C 1 RJ) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ANGRA FUR | MG 500 kV ANGRA FUR MG1 RJ | RB | FT MG 500 kV ANGRA FUR MG1 RJ | 062/2001 | IPCA | RBNI | REA 8314/2019 | 2/11/2021 | 2/10/2036 | R$2,107.77 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000405/2014 (FT: LT 500 kV ANGRA FUR /ZONA OESTE C 1 RJ) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ANGRA FUR | MG 500 kV ANGRA FUR MG1 RJ | RB | FT MG 500 kV ANGRA FUR MG1 RJ | 062/2001 | IPCA | RBNIA | DSP 4208/2023 | R$109,911.01 | 6/1/2025 | Prevista | T2023-187 | Instalação de 1 MÓDULO DE INFRAESTRUTURA DE MANOBRA (138 KV - BPT) para o substituir o transformador TR1A por novo Transformador 138/13,8 kV, 15 MVA, na SE Angra. | ||||
| AXIA Energia | ANGRA FUR | MG 500 kV ANGRA FUR MG1 RJ | RB | FT MG 500 kV ANGRA FUR MG1 RJ | 062/2001 | IPCA | RBNIA | DSP 4208/2023 | R$49,952.53 | 6/1/2025 | Prevista | T2023-187 | Instalação de 1 MÓDULO DE INFRAESTRUTURA DE MANOBRA (13,8 KV - BPT) para o substituir o transformador TR1A por novo Transformador 138/13,8 kV, 15 MVA, na SE Angra. | ||||
| AXIA Energia | ANGRA FUR | MG 500 kV ANGRA FUR MG1 RJ | RB | FT MG 500 kV ANGRA FUR MG1 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/19/2015 | 5/7/2035 | R$542,976.87 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ANGRA FUR | MC 500 kV TR 500/25 kV ANGRA FUR TRG2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | MC 500 kV TR 500/25 kV ANGRA FUR TRG2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,518,075.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | MC 500 kV TR 500/25 kV ANGRA FUR TRG2 RJ | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 12/2/2016 | 12/24/2045 | R$51,331.34 | 6/1/2025 | Ativa | Substituição da seccionadora SC921 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | ANGRA FUR | MC 500 kV TR 500/25 kV ANGRA FUR TRG2 RJ | DIT | 062/2001 | IPCA | RCDMA | REA 6787/2017 | R$ 1,520,644.75 | 6/1/2025 | Prevista | T2017-068 | Remanejamento dos vãos de 500 kV na SE Angra. | |||||
| AXIA Energia | ANGRA FUR | MC 500 kV TR 500/19 kV ANGRA FUR TRG1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | MC 500 kV TR 500/19 kV ANGRA FUR TRG1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/11/2018 | 7/13/2048 | R$159,359.00 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | ANGRA FUR | MC 500 kV TR 500/138 kV ANGRA FUR TR58 RJ | RBF | FT TR 500/138 kV ANGRA FUR TR58 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | MC 500 kV TR 500/138 kV ANGRA FUR TR58 RJ | RBF | FT TR 500/138 kV ANGRA FUR TR58 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,518,075.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | MC 500 kV TR 500/138 kV ANGRA FUR TR58 RJ | RBF | FT TR 500/138 kV ANGRA FUR TR58 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,627,458.60 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | MC 500 kV TR 500/138 kV ANGRA FUR TR58 RJ | RBF | FT TR 500/138 kV ANGRA FUR TR58 RJ | 062/2001 | IPCA | RBNI | REA 7761/2019 | 3/27/2022 | 3/26/2037 | R$410,195.35 | 6/1/2025 | Ativa | Sistema de Proteção, Supervisão e circuitos secundários de corrente, potencial e controle - Autotransformadores AT58 500/345/13,8 kV. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ANGRA FUR | MC 500 kV RTL 500 kV 136 Mvar ANGRA FUR RT1 RJ | RB | FT RTL 500 kV 136 MVAr ANGRA FUR RT1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,673.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 500/138 kV ANGRA FUR TR58 RJ | RBF | FT TR 500/138 kV ANGRA FUR TR58 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,609.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 500/138 kV ANGRA FUR TR58 RJ | RBF | FT TR 500/138 kV ANGRA FUR TR58 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$443,638.10 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 500/138 kV ANGRA FUR TR58 RJ | RBF | FT TR 500/138 kV ANGRA FUR TR58 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$475,603.79 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 500/138 kV ANGRA FUR TR58 RJ | RBF | FT TR 500/138 kV ANGRA FUR TR58 RJ | 062/2001 | IPCA | RBNI | REA 7761/2019 | 3/27/2022 | 3/26/2037 | R$234,198.34 | 6/1/2025 | Ativa | Sistema de Proteção, Supervisão e circuitos secundários de corrente, potencial e controle - Autotransformadores AT58 500/345/13,8 kV. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/4,16 kV ANGRA FUR T1A2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,609.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/4,16 kV ANGRA FUR T1A2 RJ | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 7/2/2016 | 2/24/2039 | R$12,107.24 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/4,16 kV ANGRA FUR T1A2 RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/27/2018 | 2/14/2047 | R$103,710.88 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/138 kV ANGRA FUR TRD2 RJ MC2 | RBF | FT TR 138/138 kV ANGRA FUR TRD2 RJ | 062/2001 | IPCA | RBNI | REA 4089/2013 | 7/27/2018 | 4/12/2045 | R$44,361.46 | 6/1/2025 | Ativa | T2013-030 | Instalar, na SE Angra, no lado de saída do transformador defasador reserva TRDR1 138/138 kV - 400 MVA. um módulo de conexão, em 138 kV, composto por uma chave seccionadora e 3 pára-raios. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/138 kV ANGRA FUR TRD2 RJ MC1 | RBF | FT TR 138/138 kV ANGRA FUR TRD2 RJ | 062/2001 | IPCA | RBNI | REA 4089/2013 | 7/27/2018 | 2/10/2046 | R$53,749.73 | 6/1/2025 | Ativa | T2013-030 | Instalar, na SE Angra, no lado de entrada do transformador defasador reserva TRDR1 138/138 kV - 400 MVA. um módulo de conexão, em 138 kV, composto por uma chave seccionadora e 3 pára-raios. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/138 kV ANGRA FUR TRD1 RJ MC2 | RBF | FT TR 500/138 kV ANGRA FUR TR58 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,861.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/138 kV ANGRA FUR TRD1 RJ MC1 | RBF | FT TR 500/138 kV ANGRA FUR TR58 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$54,206.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/13,8 kV ANGRA FUR TR1D RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$107,257.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/13,8 kV ANGRA FUR TR1D RJ | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 6/4/2016 | 1/27/2039 | R$12,067.30 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/13,8 kV ANGRA FUR TR1D RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/1/2017 | 7/4/2047 | R$55,110.38 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/13,8 kV ANGRA FUR TR1C RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$107,257.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/13,8 kV ANGRA FUR TR1C RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 1/26/2017 | 4/20/2040 | R$4,130.54 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARARAIOS VÃO TR1C LADO 138 KV FASE A * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/13,8 kV ANGRA FUR TR1C RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 1/26/2017 | 4/20/2040 | R$4,130.54 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARARAIOS VÃO TR1C LADO 138 KV FASE B * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/13,8 kV ANGRA FUR TR1C RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 1/26/2017 | 4/20/2040 | R$4,130.54 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARARAIOS VÃO TR1C LADO 138 KV FASE C * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/13,8 kV ANGRA FUR TR1C RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/1/2017 | 5/26/2050 | R$136,684.24 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/13,8 kV ANGRA FUR TR1B RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$107,257.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/13,8 kV ANGRA FUR TR1B RJ | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 6/2/2016 | 1/25/2039 | R$12,064.45 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/13,8 kV ANGRA FUR TR1B RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/1/2017 | 7/4/2047 | R$82,665.57 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/13,8 kV ANGRA FUR TR1A RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$107,257.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/13,8 kV ANGRA FUR TR1A RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 1/10/2017 | 4/4/2040 | R$4,123.11 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARARAIOS VÃO TR1A LADO 138 KV FASE A * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/13,8 kV ANGRA FUR TR1A RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 1/10/2017 | 4/4/2040 | R$4,123.11 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARARAIOS VÃO TR1A LADO 138 KV FASE B * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/13,8 kV ANGRA FUR TR1A RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 1/10/2017 | 4/4/2040 | R$4,123.11 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARARAIOS VÃO TR1A LADO 138 KV FASE C * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/13,8 kV ANGRA FUR TR1A RJ | DIT | 062/2001 | IPCA | RCDMA | DSP 4208/2023 | R$ 1,122,898.55 | 6/1/2025 | Prevista | T2023-187 | Obra de Substituição Completa - Substituição, na SE ANGRA FUR, de um módulo de conexão, em 138 kV, para a transformação TR1A 138/13,8 kV para substituir o transformador TR1A por novo Transformador 138/13,8 kV, 15 MVA. (Rotina-Substituição - o IdeMdl 10332) | |||||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/13,8 kV ANGRA FUR TR1A RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/1/2017 | 7/4/2047 | R$82,665.57 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/13,8 kV ANGRA FUR T2A3 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,609.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/13,8 kV ANGRA FUR T2A3 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$443,638.10 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/13,8 kV ANGRA FUR T2A3 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$475,603.79 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | MC 138 kV TR 138/13,8 kV ANGRA FUR T2A3 RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/26/2017 | 5/29/2047 | R$82,405.35 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | ANGRA FUR | MC 138 kV BC 138 kV 25 Mvar ANGRA FUR BC1A RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$105,211.38 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | MC 138 kV BC 138 kV 25 Mvar ANGRA FUR BC1A RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/1/2017 | 7/4/2047 | R$27,003.55 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | ANGRA FUR | MC 13,8 kV TT 13,8/0,12 kV ANGRA FUR TR58 RJ | RBF | FT TR 500/138 kV ANGRA FUR TR58 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1D RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,131.93 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1C RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$17,692.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1B RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$46,266.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1A RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$46,266.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1A RJ | DIT | 062/2001 | IPCA | RCDMA | DSP 4208/2023 | R$462,852.29 | 6/1/2025 | Prevista | T2023-187 | Obra de Substituição Completa - Substituição, na SE ANGRA FUR, de um módulo de conexão, em 13,8 kV, para a transformação TR1A 138/13,8 kV para substituir o transformador TR1A por novo Transformador 138/13,8 kV, 15 MVA. (Rotina-Substituição - o IdeMdl 10333) | |||||
| AXIA Energia | ANGRA FUR | MC 13,8 kV BC 13,8 kV 5 Mvar ANGRA FUR BC2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,752.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | MC 13,8 kV BC 13,8 kV 3 Mvar ANGRA FUR BC1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,752.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | IB 500 kV MG 500 kV ANGRA FUR MG1 RJ IB1 | RB | FT MG 500 kV ANGRA FUR MG1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB4 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$92,690.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB4 | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 5/31/2016 | 12/24/2038 | R$12,062.00 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | ANGRA FUR | IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB4 | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/1/2017 | 12/25/2049 | R$164,621.63 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | ANGRA FUR | IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB3 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$92,690.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB3 | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 7/14/2016 | 4/8/2039 | R$12,123.72 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | ANGRA FUR | IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB3 | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/23/2017 | 7/3/2045 | R$73,270.62 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | ANGRA FUR | IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB2 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$82,866.56 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB2 | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/21/2017 | 7/17/2048 | R$219,172.83 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | ANGRA FUR | IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB1 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$92,690.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ | RB | FT LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ | RB | FT LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,720,019.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ | RB | FT LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ | 062/2001 | IPCA | RBNI | REA 5861/2016 | 2/10/2021 | 2/9/2036 | R$12,544.97 | 6/1/2025 | Ativa | LT 500kV Angra - Zona Oeste - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ANGRA FUR | EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ | RB | FT LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/31/2023 | 2/2/2053 | R$36,536.02 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ANGRA FUR | EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ | RB | FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ | RB | FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ | 062/2001 | IPCA | RMEL | REN 643/2014 | 12/2/2016 | 6/17/2048 | R$286,942.67 | 6/1/2025 | Ativa | Substituição do DJ9144 e SC9145 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ANGRA FUR | EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ | RB | FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 4/23/2017 | 10/16/2040 | R$14,086.00 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARARAIO LTANSJ STAN FASE A * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ANGRA FUR | EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ | RB | FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 4/23/2017 | 10/16/2040 | R$14,086.00 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARARAIO LTANSJ STAN FASE B * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ANGRA FUR | EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ | RB | FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 4/23/2017 | 10/16/2040 | R$14,086.00 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARARAIO LTANSJ STAN FASE C * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ANGRA FUR | EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ | RB | FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ | 062/2001 | IPCA | RBNI | REA 5861/2016 | 2/10/2021 | 2/9/2036 | R$12,544.97 | 6/1/2025 | Ativa | LT 500kV Angra - São José - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ANGRA FUR | EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ | RB | FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 4/29/2018 | 5/30/2047 | R$471,156.08 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ANGRA FUR | EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP | RB | FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ANGRA FUR | EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP | RB | FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP | 062/2001 | IPCA | RBNI | REA 4347/2013 | 7/6/2015 | 3/29/2041 | R$8,702.55 | 6/1/2025 | Ativa | Substituição de RDP 500 kV INCLUÍDA NO CICLO 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ANGRA FUR | EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP | RB | FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP | 062/2001 | IPCA | RBNI | REA 5861/2016 | 2/10/2021 | 2/9/2036 | R$12,544.97 | 6/1/2025 | Ativa | LT 500kV Angra - Cachoeira Paulista - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ANGRA FUR | EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP | RB | FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 8/19/2018 | 3/15/2048 | R$583,589.88 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ANGRA FUR | EL 138 kV ANGRA FUR MAMBUCABA-AMPLA | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$159,930.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | EL 138 kV ANGRA FUR MAMBUCABA-AMPLA | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/1/2017 | 5/26/2050 | R$136,684.24 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | ANGRA FUR | EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /SANTA CRUZ C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /SANTA CRUZ C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$647,926.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /SANTA CRUZ C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$694,611.89 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /JACUACANGA C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /JACUACANGA C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$647,926.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /JACUACANGA C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$694,611.89 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /ANGRA AMPLA C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /ANGRA AMPLA C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$647,926.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /ANGRA AMPLA C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$694,611.89 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | EL 13,8 kV ANGRA FUR DIST9 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$50,185.98 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | EL 13,8 kV ANGRA FUR DIST8 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$50,185.98 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | EL 13,8 kV ANGRA FUR DIST7 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$50,185.98 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | EL 13,8 kV ANGRA FUR DIST6 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$50,185.98 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | EL 13,8 kV ANGRA FUR DIST5 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$50,185.98 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | EL 13,8 kV ANGRA FUR DIST4 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$50,185.98 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | EL 13,8 kV ANGRA FUR DIST3 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$50,185.98 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | EL 13,8 kV ANGRA FUR DIST3 | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$192,582.55 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | EL 13,8 kV ANGRA FUR DIST2 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$50,185.98 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | EL 13,8 kV ANGRA FUR DIST12 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$50,185.98 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | EL 13,8 kV ANGRA FUR DIST11 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$50,185.98 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | EL 13,8 kV ANGRA FUR DIST10 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$50,185.98 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | EL 13,8 kV ANGRA FUR DIST1 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$50,185.98 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | BC 138 kV 25 Mvar ANGRA FUR BC1A RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$122,812.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | BC 138 kV 25 Mvar ANGRA FUR BC1A RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$471,279.60 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | BC 13,8 kV 5 Mvar ANGRA FUR BC2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$28,386.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | BC 13,8 kV 5 Mvar ANGRA FUR BC2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$108,929.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ANGRA FUR | BC 13,8 kV 3 Mvar ANGRA FUR BC1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$28,386.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | AQUIRAZ II | TT 69/0 kV AQUIRAZ II TT2 CE | RB | FT MG 230 kV AQUIRAZ II MG1 CE | 004/2010 | IPCA | RBNI | REA 4877/2014 | 12/4/2023 | 12/3/2053 | R$285,479.37 | 6/1/2025 | Ativa | T2014-061 | Instalação, na SE AQUIRAZ II, de transformador de aterramento TT210 ohms / fase, em 69 kV. | ||
| AXIA Energia Nordeste | AQUIRAZ II | TT 69/0 kV AQUIRAZ II TT1 CE | DIT | 004/2010 | IPCA | RPEC | CC 004/2010 | 7/12/2010 | 7/11/2040 | R$63,901.23 | 6/1/2025 | Ativa | T2010-058-C | Contrato de Concessão nº 004/2010 SE Aquiraz II 230/69kV - 450MVA - RPEC *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | AQUIRAZ II | TR 230/69 kV AQUIRAZ II TR4 CE | RBF | FT TR 230/69 kV AQUIRAZ II TR4 CE | 004/2010 | IPCA | RBNI | REA 4877/2014 | 12/4/2023 | 12/3/2058 | R$ 1,722,187.72 | 6/1/2025 | Ativa | T2014-061 | Instalação, na SE AQUIRAZ II, do quarto transformador trifásico 04T4 230/69-13,8 KV - 150 MVA. | ||
| AXIA Energia Nordeste | AQUIRAZ II | TR 230/69 kV AQUIRAZ II TR3 CE | RBF | FT TR 230/69 kV AQUIRAZ II TR3 CE | 004/2010 | IPCA | RBL | CC 004/2010 | 7/12/2010 | 7/11/2040 | R$ 1,279,546.83 | 6/1/2025 | Ativa | T2010-058-C | Contrato de Concessão nº 004/2010 SE Aquiraz II 230/69kV - 450MVA - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | AQUIRAZ II | TR 230/69 kV AQUIRAZ II TR2 CE | RBF | FT TR 230/69 kV AQUIRAZ II TR2 CE | 004/2010 | IPCA | RBL | CC 004/2010 | 7/12/2010 | 7/11/2040 | R$ 1,279,546.83 | 6/1/2025 | Ativa | T2010-058-C | Contrato de Concessão nº 004/2010 SE Aquiraz II 230/69kV - 450MVA - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | AQUIRAZ II | TR 230/69 kV AQUIRAZ II TR1 CE | RBF | FT TR 230/69 kV AQUIRAZ II TR1 CE | 004/2010 | IPCA | RBL | CC 004/2010 | 7/12/2010 | 7/11/2040 | R$ 1,279,546.83 | 6/1/2025 | Ativa | T2010-058-C | Contrato de Concessão nº 004/2010 SE Aquiraz II 230/69kV - 450MVA - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | AQUIRAZ II | MG 230 kV AQUIRAZ II MG2 CE | RB | FT MG 230 kV AQUIRAZ II MG2 CE | 061/2001 | IPCA | RBNI | REA 2823/2011 | 10/2/2020 | 8/25/2049 | R$440,601.36 | 6/1/2025 | Ativa | T2010-086 | Complemento, na SE Aquiraz II, de infraestrutura de módulo geral pela instalação de dois módulos de entrada de linha 230 kV, arranjo barra dupla a quatro chaves para o segundo circuito da LT 230 kV Aquiraz II - Fortaleza I e para o segundo circuito da LT 230 kV Banabuiú - Aquiraz II. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | AQUIRAZ II | MG 230 kV AQUIRAZ II MG2 CE | RB | FT MG 230 kV AQUIRAZ II MG2 CE | 061/2001 | IPCA | RBNI | REA 3631/2012 | 11/9/2020 | 10/2/2049 | R$441,561.36 | 6/1/2025 | Ativa | T2012-075 | Complementação do módulo de infraestrutura geral da subestação Aquiraz II com a instalação de dois módulos de infraestrutura de manobra 230 kV, arranjo barra dupla a 4 chaves. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | AQUIRAZ II | MG 230 kV AQUIRAZ II MG2 CE | RB | FT MG 230 kV AQUIRAZ II MG2 CE | 061/2001 | IPCA | RMEL | REN 443/2011 | 10/7/2016 | 10/6/2033 | R$1,437.80 | 6/1/2025 | Ativa | Implantação de Banco de Baterias * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | AQUIRAZ II | MG 230 kV AQUIRAZ II MG2 CE | RB | FT MG 230 kV AQUIRAZ II MG2 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/9/2019 | 5/8/2038 | R$74,362.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | AQUIRAZ II | MG 230 kV AQUIRAZ II MG1 CE | RB | FT MG 230 kV AQUIRAZ II MG1 CE | 004/2010 | IPCA | RBL | CC 004/2010 | 7/12/2010 | 7/11/2040 | R$ 1,392,783.92 | 6/1/2025 | Ativa | T2010-058-C | Contrato de Concessão nº 004/2010 SE Aquiraz II 230/69kV - 450MVA - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | AQUIRAZ II | MG 230 kV AQUIRAZ II MG1 CE | RB | FT MG 230 kV AQUIRAZ II MG1 CE | 004/2010 | IPCA | RBNI | REA 2837/2011 | 12/11/2013 | 12/10/2044 | R$47,972.46 | 6/1/2025 | Ativa | Complementação do Módulo de Infraestrutura Geral com três Módulos de Infraestrutura de Manobra associados aos três novos módulos de entrada de linha 69 kV. RAP reconhecida no reajuste do ciclo 2015-2016. * Receita Revisada no reajuste do ciclo 2016-2017 *(Receita revisada em 21/06/2021) | |||
| AXIA Energia Nordeste | AQUIRAZ II | MG 230 kV AQUIRAZ II MG1 CE | RB | FT MG 230 kV AQUIRAZ II MG1 CE | 004/2010 | IPCA | RBNI | REA 4877/2014 | 12/4/2023 | 12/3/2055 | R$63,499.05 | 6/1/2025 | Ativa | T2014-061 | Complementação, na SE Aquiraz II, do módulo de infraestrutura geral 230 kV, arranjo barra dupla a 4 chaves e a instalação de um módulo de infraestrutura de manobra 230 kV, arranjo barra dupla a 4 chaves. | ||
| AXIA Energia Nordeste | AQUIRAZ II | MG 230 kV AQUIRAZ II MG1 CE | RB | FT MG 230 kV AQUIRAZ II MG1 CE | 004/2010 | IPCA | RBNI | REA 4877/2014 | 12/4/2023 | 12/3/2054 | R$33,533.75 | 6/1/2025 | Ativa | T2014-061 | Complementação, na SE Aquiraz II, do módulo de infraestrutura geral 69 kV com a instalação de um módulo de infraestrutura de manobra 69 kV, arranjo barra principal e transferência e um módulo de infraestrutura de manobra 69 kV, arranjo barra princiapl e transferência. | ||
| AXIA Energia Nordeste | AQUIRAZ II | MG 230 kV AQUIRAZ II MG1 CE | RB | FT MG 230 kV AQUIRAZ II MG1 CE | 004/2010 | IPCA | RBNI | REA 7761/2019 | 9/30/2015 | 9/29/2030 | R$25,774.51 | 6/1/2025 | Ativa | Implantação de Sistema para acesso remoto a dispositivos de Proteção, Controle e Automação. Sistema composto de Painel com PCs Industriais (1 Concentrador, 1 Firewall, 1 Receptor GPS, 1 Switch Gerenciável) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 | |||
| AXIA Energia Nordeste | AQUIRAZ II | MG 230 kV AQUIRAZ II MG1 CE | RB | FT MG 230 kV AQUIRAZ II MG1 CE | 004/2010 | IPCA | RBNI | REN 1020/2022 | 1/1/2024 | 12/31/2051 | R$43,936.05 | 6/1/2025 | Ativa | MIM ASSOCIADO: Implantação de Entrada de Linha em69 kV na SE - Aquiraz II * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 | |||
| AXIA Energia Nordeste | AQUIRAZ II | MC 69 kV TT 69/0 kV AQUIRAZ II TT2 CE | RB | FT MG 230 kV AQUIRAZ II MG1 CE | 004/2010 | IPCA | RBNI | REA 4877/2014 | 12/4/2023 | 12/3/2043 | R$105,406.31 | 6/1/2025 | Ativa | T2014-061 | Instalação, na SE AQUIRAZ II, de um módulo de conexão para o TT 69/0 kV AQUIRAZ II TT2 CE. | ||
| AXIA Energia Nordeste | AQUIRAZ II | MC 69 kV TT 69/0 kV AQUIRAZ II TT1 CE | DIT | 004/2010 | IPCA | RPEC | CC 004/2010 | 7/12/2010 | 7/11/2040 | R$72,853.83 | 6/1/2025 | Ativa | T2010-058-C | Contrato de Concessão nº 004/2010 SE Aquiraz II 230/69kV - 450MVA - RPEC *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | AQUIRAZ II | MC 69 kV TR 230/69 kV AQUIRAZ II TR4 CE | RBF | FT TR 230/69 kV AQUIRAZ II TR4 CE | 004/2010 | IPCA | RBNI | REA 4877/2014 | 12/4/2023 | 12/3/2046 | R$241,414.88 | 6/1/2025 | Ativa | T2014-061 | Instalação, na SE AQUIRAZ II, de um módulo de conexão, em 69 kV, para a transformação TR 230/69 kV AQUIRAZ II TR4 CE. | ||
| AXIA Energia Nordeste | AQUIRAZ II | MC 69 kV TR 230/69 kV AQUIRAZ II TR3 CE | RBF | FT TR 230/69 kV AQUIRAZ II TR3 CE | 004/2010 | IPCA | RBL | CC 004/2010 | 7/12/2010 | 7/11/2040 | R$245,644.12 | 6/1/2025 | Ativa | T2010-058-C | Contrato de Concessão nº 004/2010 SE Aquiraz II 230/69kV - 450MVA - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | AQUIRAZ II | MC 69 kV TR 230/69 kV AQUIRAZ II TR2 CE | RBF | FT TR 230/69 kV AQUIRAZ II TR2 CE | 004/2010 | IPCA | RBL | CC 004/2010 | 7/12/2010 | 7/11/2040 | R$245,644.12 | 6/1/2025 | Ativa | T2010-058-C | Contrato de Concessão nº 004/2010 SE Aquiraz II 230/69kV - 450MVA - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | AQUIRAZ II | MC 69 kV TR 230/69 kV AQUIRAZ II TR1 CE | RBF | FT TR 230/69 kV AQUIRAZ II TR1 CE | 004/2010 | IPCA | RBL | CC 004/2010 | 7/12/2010 | 7/11/2040 | R$245,644.12 | 6/1/2025 | Ativa | T2010-058-C | Contrato de Concessão nº 004/2010 SE Aquiraz II 230/69kV - 450MVA - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | AQUIRAZ II | MC 230 kV TR 230/69 kV AQUIRAZ II TR4 CE | RBF | FT TR 230/69 kV AQUIRAZ II TR4 CE | 004/2010 | IPCA | RBNI | REA 4877/2014 | 12/4/2023 | 12/3/2047 | R$585,668.94 | 6/1/2025 | Ativa | T2014-061 | Instalação, na SE AQUIRAZ II, de um módulo de conexão, em 230 kV, para a transformação TR 230/69 kV AQUIRAZ II TR4 CE. | ||
| AXIA Energia Nordeste | AQUIRAZ II | MC 230 kV TR 230/69 kV AQUIRAZ II TR3 CE | RBF | FT TR 230/69 kV AQUIRAZ II TR3 CE | 004/2010 | IPCA | RBL | CC 004/2010 | 7/12/2010 | 7/11/2040 | R$616,320.08 | 6/1/2025 | Ativa | T2010-058-C | Contrato de Concessão nº 004/2010 SE Aquiraz II 230/69kV - 450MVA - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | AQUIRAZ II | MC 230 kV TR 230/69 kV AQUIRAZ II TR2 CE | RBF | FT TR 230/69 kV AQUIRAZ II TR2 CE | 004/2010 | IPCA | RBL | CC 004/2010 | 7/12/2010 | 7/11/2040 | R$616,320.08 | 6/1/2025 | Ativa | T2010-058-C | Contrato de Concessão nº 004/2010 SE Aquiraz II 230/69kV - 450MVA - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | AQUIRAZ II | MC 230 kV TR 230/69 kV AQUIRAZ II TR1 CE | RBF | FT TR 230/69 kV AQUIRAZ II TR1 CE | 004/2010 | IPCA | RBL | CC 004/2010 | 7/12/2010 | 7/11/2040 | R$616,320.08 | 6/1/2025 | Ativa | T2010-058-C | Contrato de Concessão nº 004/2010 SE Aquiraz II 230/69kV - 450MVA - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | AQUIRAZ II | IB 69 kV MG 230 kV AQUIRAZ II MG1 CE IB1 | DIT | 004/2010 | IPCA | RPEC | CC 004/2010 | 7/12/2010 | 7/11/2040 | R$105,954.50 | 6/1/2025 | Ativa | T2010-058-C | Contrato de Concessão nº 004/2010 SE Aquiraz II 230/69kV - 450MVA - RPEC *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | AQUIRAZ II | IB 230 kV MG 230 kV AQUIRAZ II MG1 CE IB1 | RB | FT MG 230 kV AQUIRAZ II MG1 CE | 004/2010 | IPCA | RBL | CC 004/2010 | 7/12/2010 | 7/11/2040 | R$452,558.37 | 6/1/2025 | Ativa | T2010-058-C | Contrato de Concessão nº 004/2010 SE Aquiraz II 230/69kV - 450MVA - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | AQUIRAZ II | EL 69 kV AQUIRAZ II EUZEBIO 3 | DIT | 004/2010 | IPCA | RCDM | REA 2837/2011 | 12/11/2013 | 12/10/2037 | R$291,138.62 | 6/1/2025 | Ativa | Instalar dois módulos de entrada de linha de 69 kV para Euzébio. RAP reconhecida no reajuste do ciclo 2015-2016. * Receita Revisada no reajuste do ciclo 2016-2017 *(Receita revisada em 21/06/2021) | ||||
| AXIA Energia Nordeste | AQUIRAZ II | EL 69 kV AQUIRAZ II EUZEBIO 2 | DIT | 004/2010 | IPCA | RCDM | REA 2837/2011 | 12/11/2013 | 12/10/2037 | R$291,138.62 | 6/1/2025 | Ativa | Instalar dois módulos de entrada de linha de 69 kV para Euzébio. RAP reconhecida no reajuste do ciclo 2015-2016. * Receita Revisada no reajuste do ciclo 2016-2017 *(Receita revisada em 21/06/2021) | ||||
| AXIA Energia Nordeste | AQUIRAZ II | EL 69 kV AQUIRAZ II EUZEBIO 1 | DIT | 004/2010 | IPCA | RCDM | REA 2837/2011 | 12/11/2013 | 12/10/2037 | R$291,138.62 | 6/1/2025 | Ativa | Instalar um módulo de entrada de linha de 69 kV para Cascavel. RAP reconhecida no reajuste do ciclo 2015-2016. * Receita Revisada no reajuste do ciclo 2016-2017 *(Receita revisada em 21/06/2021) | ||||
| AXIA Energia Nordeste | AQUIRAZ II | EL 69 kV AQUIRAZ II DIST5 | DIT | 004/2010 | IPCA | RCDM | REN 1020/2022 | 1/1/2024 | 12/31/2054 | R$524,544.19 | 6/1/2025 | Ativa | Implantação de Entrada de Linha em69 kV na SE - Aquiraz II * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 | ||||
| AXIA Energia Nordeste | AQUIRAZ II | EL 69 kV AQUIRAZ II DIST4 | DIT | 004/2010 | IPCA | RPEC | CC 004/2010 | 7/12/2010 | 7/11/2040 | R$188,006.71 | 6/1/2025 | Ativa | T2010-058-C | Contrato de Concessão nº 004/2010 SE Aquiraz II 230/69kV - 450MVA - RPEC *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | AQUIRAZ II | EL 69 kV AQUIRAZ II DIST3 | DIT | 004/2010 | IPCA | RPEC | CC 004/2010 | 7/12/2010 | 7/11/2040 | R$188,006.71 | 6/1/2025 | Ativa | T2010-058-C | Contrato de Concessão nº 004/2010 SE Aquiraz II 230/69kV - 450MVA - RPEC *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | AQUIRAZ II | EL 69 kV AQUIRAZ II DIST2 | DIT | 004/2010 | IPCA | RPEC | CC 004/2010 | 7/12/2010 | 7/11/2040 | R$188,006.71 | 6/1/2025 | Ativa | T2010-058-C | Contrato de Concessão nº 004/2010 SE Aquiraz II 230/69kV - 450MVA - RPEC *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | AQUIRAZ II | EL 69 kV AQUIRAZ II DIST1 | DIT | 004/2010 | IPCA | RPEC | CC 004/2010 | 7/12/2010 | 7/11/2040 | R$188,006.71 | 6/1/2025 | Ativa | T2010-058-C | Contrato de Concessão nº 004/2010 SE Aquiraz II 230/69kV - 450MVA - RPEC *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | AQUIRAZ II | EL 230 kV AQUIRAZ II LT 230 kV BANABUIU /AQUIRAZ II C-3 CE | RB | FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE | 061/2001 | IPCA | RBNI | REA 3631/2012 | 11/6/2020 | 3/1/2049 | R$ 1,690,690.11 | 6/1/2025 | Ativa | T2012-075 | Instalação, na SE Aquiraz II, de um módulo de entrada de linha 230 kV, arranjo barra dupla a 4 chaves, destinada a conexão da Linha de Transmissão 230 kV Banabuiú - Aquiraz II - C1, originada do seccionamento da Linha de Transmissão 230 kV Banabuiú - Fortaleza C1. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | AQUIRAZ II | EL 230 kV AQUIRAZ II LT 230 kV BANABUIU /AQUIRAZ II C-2 CE | RB | FT LT 230 kV BANABUIU /AQUIRAZ II C-2 CE | 061/2001 | IPCA | RBNI | REA 10140/2021 | 12/31/2015 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo BD4, na subestação Aquiraz II, associada à linha de transmissão LT 230 kV Banabuiú /Aquiraz II C2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | AQUIRAZ II | EL 230 kV AQUIRAZ II LT 230 kV BANABUIU /AQUIRAZ II C-2 CE | RB | FT LT 230 kV BANABUIU /AQUIRAZ II C-2 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/12/2021 | 12/15/2051 | R$21,958.60 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | AQUIRAZ II | EL 230 kV AQUIRAZ II LT 230 kV BANABUIU /AQUIRAZ II C-1 CE | RB | FT LT 230 kV BANABUIU /AQUIRAZ II C-1 CE | 061/2001 | IPCA | RBNI | REA 2823/2011 | 10/2/2020 | 10/1/2048 | R$ 1,706,385.38 | 6/1/2025 | Ativa | T2010-086 | Instalar, na SE AQUIRAZ II, um módulo de entrada de linha para o circuito LT 230 kV BANABUIU /AQUIRAZ II C-1 CE originado do seccionamento do circuito LT 230 kV BANABUIU /FORTALEZA C-1 CE na SE AQUIRAZ II. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | AQUIRAZ II | EL 230 kV AQUIRAZ II LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE | 061/2001 | IPCA | RBNI | REA 3631/2012 | 8/27/2021 | 12/20/2049 | R$ 1,726,007.75 | 6/1/2025 | Ativa | T2012-075 | Instalação, na SE Aquiraz II, de um módulo de entrada de linha 230 kV, arranjo barra dupla a 4 chaves, destinada a conexão da Linha de Transmissão 230 kV Fortaleza - Aquiraz II - C1, originada do seccionamento da Linha de Transmissão 230 kV Banabuiú - Fortaleza C1. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | AQUIRAZ II | EL 230 kV AQUIRAZ II LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE | 061/2001 | IPCA | RBNI | REA 10140/2021 | 12/31/2015 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo BD4, na subestação Aquiraz II, associada à linha de transmissão 230 kV Aquiraz II /Fortaleza. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | AQUIRAZ II | EL 230 kV AQUIRAZ II LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE | 061/2001 | IPCA | RBNI | REA 2823/2011 | 10/2/2020 | 1/25/2049 | R$ 1,686,479.04 | 6/1/2025 | Ativa | T2010-086 | Instalar, na SE AQUIRAZ II, um módulo de entrada de linha para o circuito LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE originado do seccionamento do circuito LT 230 kV BANABUIU /FORTALEZA C-1 CE na SE AQUIRAZ II. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | ARAPIRACA III | TT 69/0 kV ARAPIRACA III TT1 AL | DIT | 013/2010 | IPCA | RPEC | CC 013/2010 | 10/6/2010 | 10/6/2040 | R$89,327.08 | 6/1/2025 | Ativa | T2010-083 | Construção da SE 230/69 kV Arapiraca III, com 100 MVA, alimentada a partir do seccionamento da LT 230 kV Rio Largo II – Penedo. *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | ARAPIRACA III | TR 230/69 kV ARAPIRACA III TR3 AL | RBF | FT TR 230/69 kV ARAPIRACA III TR3 AL | 013/2010 | IPCA | RBNIA | DSP 3012/2024 | R$ 1,655,933.95 | 6/1/2025 | Prevista | T2024-191 | Instalar, na SE ARAPIRACA III, de uma transformação trifásica TR3 230/69-13,8 KV - 100 MVA. | ||||
| AXIA Energia Nordeste | ARAPIRACA III | TR 230/69 kV ARAPIRACA III TR2 AL | RBF | FT TR 230/69 kV ARAPIRACA III TR2 AL | 013/2010 | IPCA | RBNI | REA 5211/2015 | 10/24/2016 | 10/24/2050 | R$ 1,552,115.38 | 6/1/2025 | Ativa | T2015-020 | Instalação, na Subestação Arapiraca III, do segundo transformador 230/69 kV, de 100 MVA. *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Nordeste | ARAPIRACA III | TR 230/69 kV ARAPIRACA III TR1 AL | RBF | FT TR 230/69 kV ARAPIRACA III TR1 AL | 013/2010 | IPCA | RBL | CC 013/2010 | 6/17/2013 | 10/6/2040 | R$ 2,948,945.98 | 6/1/2025 | Ativa | T2010-083 | Construção da SE 230/69 kV Arapiraca III, com 100 MVA, alimentada a partir do seccionamento da LT 230 kV Rio Largo II – Penedo. *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | ARAPIRACA III | RTL 230 kV 15 Mvar ARAPIRACA III RT1 AL | RB | FT RTL 230 kV 15 Mvar ARAPIRACA III RT1 AL | 013/2010 | IPCA | RBNI | REA 10134/2021 | 8/15/2016 | 10/5/2040 | R$87,826.00 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Reator de Linha Manobrável 230 kV – 15 MVAr, na subestação Arapiraca III, associado à linha de transmissão 230 kV Rio Largo II – Arapiraca III. | |||
| AXIA Energia Nordeste | ARAPIRACA III | MG 230 kV ARAPIRACA III MG1 AL | RB | FT MG 230 kV ARAPIRACA III MG1 AL | 013/2010 | IPCA | RBL | CC 013/2010 | 6/17/2013 | 10/6/2040 | R$ 2,547,346.61 | 6/1/2025 | Ativa | T2010-083 | Construção da SE 230/69 kV Arapiraca III, com 100 MVA, alimentada a partir do seccionamento da LT 230 kV Rio Largo II – Penedo. *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | ARAPIRACA III | MG 230 kV ARAPIRACA III MG1 AL | RB | FT MG 230 kV ARAPIRACA III MG1 AL | 013/2010 | IPCA | RBNI | REA 5211/2015 | 10/24/2016 | 10/24/2048 | R$178,615.72 | 6/1/2025 | Ativa | T2015-020 | Complementação do módulo geral da na Subestação Arapiraca III com um módulo de infraestrutura de manobra em 230 kV e um módulo de infraestrutura de manobra em 69 kV. *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Nordeste | ARAPIRACA III | MG 230 kV ARAPIRACA III MG1 AL | RB | FT MG 230 kV ARAPIRACA III MG1 AL | 013/2010 | IPCA | RMEL | REN 643/2014 | 5/22/2015 | 5/21/2030 | R$85,621.58 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE ACESSO REMOTO A DISPOSITIVOS DE PROTEÇÃO. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 21/06/2021) | |||
| AXIA Energia Nordeste | ARAPIRACA III | MG 230 kV ARAPIRACA III MG1 AL | RB | FT MG 230 kV ARAPIRACA III MG1 AL | 013/2010 | IPCA | RMEL | REN 443/2011 | 4/18/2016 | 4/17/2031 | R$11,664.61 | 6/1/2025 | Ativa | Revitalização Necessária: Implantação deSwitches Industriais * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 21/06/2021) | |||
| AXIA Energia Nordeste | ARAPIRACA III | MG 230 kV ARAPIRACA III MG1 AL | RB | FT MG 230 kV ARAPIRACA III MG1 AL | 013/2010 | IPCA | RBNI | REN 443/2011 | 10/16/2016 | 10/15/2047 | R$39,950.66 | 6/1/2025 | Ativa | Instalar módulo de infraestrutura de manobra referente a 1 EL 69 kV para Arapiraca II * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 21/06/2021) | |||
| AXIA Energia Nordeste | ARAPIRACA III | MG 230 kV ARAPIRACA III MG1 AL | RB | FT MG 230 kV ARAPIRACA III MG1 AL | 013/2010 | IPCA | RBNIA | DSP 3012/2024 | R$146,551.38 | 6/1/2025 | Prevista | T2024-191 | Módulo de Infraestrutura 230 kV associada à instalação do 3º Transformador de Potência Trifásico de 230/69 kV - 100 MVA na SE Arapiraca III | ||||
| AXIA Energia Nordeste | ARAPIRACA III | MG 230 kV ARAPIRACA III MG1 AL | RB | FT MG 230 kV ARAPIRACA III MG1 AL | 013/2010 | IPCA | RBNIA | DSP 3012/2024 | R$42,200.85 | 6/1/2025 | Prevista | T2024-191 | Módulo de Infraestrutura 69 kV associada à instalação do 3º Transformador de Potência Trifásico de 230/69 kV - 100 MVA na SE Arapiraca III | ||||
| AXIA Energia Nordeste | ARAPIRACA III | MC 69 kV TT 69/0 kV ARAPIRACA III TT1 AL | DIT | 013/2010 | IPCA | RPEC | CC 013/2010 | 10/6/2010 | 10/6/2040 | R$96,569.65 | 6/1/2025 | Ativa | T2010-083 | Construção da SE 230/69 kV Arapiraca III, com 100 MVA, alimentada a partir do seccionamento da LT 230 kV Rio Largo II – Penedo. *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | ARAPIRACA III | MC 69 kV TR 230/69 kV ARAPIRACA III TR3 AL | RBF | FT TR 230/69 kV ARAPIRACA III TR3 AL | 013/2010 | IPCA | RBNIA | DSP 3012/2024 | R$449,659.74 | 6/1/2025 | Prevista | T2024-191 | Instalar, na SE ARAPIRACA III, um módulo de conexão, em 69 kV, para o transformador trifásico TR3 230/69 kV - 100 MVA, arranjo Barra Principal e Transferência. | ||||
| AXIA Energia Nordeste | ARAPIRACA III | MC 69 kV TR 230/69 kV ARAPIRACA III TR2 AL | RBF | FT TR 230/69 kV ARAPIRACA III TR2 AL | 013/2010 | IPCA | RBNI | REA 5211/2015 | 10/24/2016 | 10/24/2039 | R$435,224.31 | 6/1/2025 | Ativa | T2015-020 | Instalação, na Subestação Arapiraca III, de um módulo de conexão, em 69 kV, arranjo barra principal e transferência, para o segundo transformador 230/69 kV, de 100 MVA. *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Nordeste | ARAPIRACA III | MC 69 kV TR 230/69 kV ARAPIRACA III TR1 AL | RBF | FT TR 230/69 kV ARAPIRACA III TR1 AL | 013/2010 | IPCA | RBL | CC 013/2010 | 6/17/2013 | 10/6/2040 | R$452,158.77 | 6/1/2025 | Ativa | T2010-083 | Construção da SE 230/69 kV Arapiraca III, com 100 MVA, alimentada a partir do seccionamento da LT 230 kV Rio Largo II – Penedo. *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | ARAPIRACA III | MC 230 kV TR 230/69 kV ARAPIRACA III TR3 AL | RBF | FT TR 230/69 kV ARAPIRACA III TR3 AL | 013/2010 | IPCA | RBNIA | DSP 3012/2024 | R$ 1,245,610.15 | 6/1/2025 | Prevista | T2024-191 | Instalar, na SE ARAPIRACA III, um módulo de conexão, em 230 kV, para o transformador trifásico TR3 230/69 kV - 100 MVA, arranjo Barra Dupla a Quatro Chaves. | ||||
| AXIA Energia Nordeste | ARAPIRACA III | MC 230 kV TR 230/69 kV ARAPIRACA III TR2 AL | RBF | FT TR 230/69 kV ARAPIRACA III TR2 AL | 013/2010 | IPCA | RBNI | REA 5211/2015 | 10/24/2016 | 10/24/2040 | R$ 1,179,280.19 | 6/1/2025 | Ativa | T2015-020 | Instalação, na Subestação Arapiraca III, de um módulo de conexão, em 230 kV, arranjo barra dupla a quatro chaves, para o segundo transformador 230/69 kV, de 100 MVA. *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Nordeste | ARAPIRACA III | MC 230 kV TR 230/69 kV ARAPIRACA III TR1 AL | RBF | FT TR 230/69 kV ARAPIRACA III TR1 AL | 013/2010 | IPCA | RBL | CC 013/2010 | 6/17/2013 | 10/6/2040 | R$ 1,137,063.96 | 6/1/2025 | Ativa | T2010-083 | Construção da SE 230/69 kV Arapiraca III, com 100 MVA, alimentada a partir do seccionamento da LT 230 kV Rio Largo II – Penedo. *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | ARAPIRACA III | MC 230 kV RTL 230 kV 15 Mvar ARAPIRACA III RT1 AL | RB | FT RTL 230 kV 15 Mvar ARAPIRACA III RT1 AL | 013/2010 | IPCA | RBNI | REA 10134/2021 | 8/15/2016 | 10/5/2040 | R$84,886.42 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de conexão manobrável do Reator de Linha Manobrável 230 kV – 15 MVAr, na subestação Arapiraca III, associado à linha de transmissão 230 kV Rio Largo II – Arapiraca III. | |||
| AXIA Energia Nordeste | ARAPIRACA III | MC 230 kV BC 230 kV 30 Mvar ARAPIRACA III BC2 AL | RB | FT BC 230 kV 30 Mvar ARAPIRACA III BC2 AL | 013/2010 | IPCA | RBL | CC 013/2010 | 6/17/2013 | 10/6/2040 | R$ 1,262,228.64 | 6/1/2025 | Ativa | T2010-083 | Construção da SE 230/69 kV Arapiraca III, com 100 MVA, alimentada a partir do seccionamento da LT 230 kV Rio Largo II – Penedo. *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | ARAPIRACA III | MC 230 kV BC 230 kV 30 Mvar ARAPIRACA III BC1 AL | RB | FT BC 230 kV 30 Mvar ARAPIRACA III BC1 AL | 013/2010 | IPCA | RBL | CC 013/2010 | 6/17/2013 | 10/6/2040 | R$ 1,262,228.64 | 6/1/2025 | Ativa | T2010-083 | Construção da SE 230/69 kV Arapiraca III, com 100 MVA, alimentada a partir do seccionamento da LT 230 kV Rio Largo II – Penedo. *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | ARAPIRACA III | IB 69 kV MG 230 kV ARAPIRACA III MG1 AL IB1 | DIT | 013/2010 | IPCA | RPEC | CC 013/2010 | 10/6/2010 | 10/6/2040 | R$145,046.94 | 6/1/2025 | Ativa | T2010-083 | Construção da SE 230/69 kV Arapiraca III, com 100 MVA, alimentada a partir do seccionamento da LT 230 kV Rio Largo II – Penedo. *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | ARAPIRACA III | IB 230 kV MG 230 kV ARAPIRACA III MG1 AL IB1 | RB | FT MG 230 kV ARAPIRACA III MG1 AL | 013/2010 | IPCA | RBL | CC 013/2010 | 6/17/2013 | 10/6/2040 | R$840,949.76 | 6/1/2025 | Ativa | T2010-083 | Construção da SE 230/69 kV Arapiraca III, com 100 MVA, alimentada a partir do seccionamento da LT 230 kV Rio Largo II – Penedo. *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | ARAPIRACA III | EL 69 kV ARAPIRACA III DIST1 | DIT | 013/2010 | IPCA | RPEC | CC 013/2010 | 10/6/2010 | 10/6/2040 | R$251,139.13 | 6/1/2025 | Ativa | T2010-083 | Construção da SE 230/69 kV Arapiraca III, com 100 MVA, alimentada a partir do seccionamento da LT 230 kV Rio Largo II – Penedo. *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | ARAPIRACA III | EL 69 kV ARAPIRACA III ARAPIRACA II | DIT | 013/2010 | IPCA | RCDM | REN 443/2011 | 10/16/2016 | 10/15/2039 | R$467,265.39 | 6/1/2025 | Ativa | Instalar módulo de entrada de linha 69 kV para Arapiraca II * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 21/06/2021) | ||||
| AXIA Energia Nordeste | ARAPIRACA III | EL 230 kV ARAPIRACA III LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL | RB | FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL | 061/2001 | IPCA | RBNI | REA 10134/2021 | 8/15/2016 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Arapiraca III, associada à linha de transmissão 230 kV Rio Largo II – Arapiraca III. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ARAPIRACA III | EL 230 kV ARAPIRACA III LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL | RB | FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/11/2022 | 11/10/2037 | R$3,008.49 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ARAPIRACA III | EL 230 kV ARAPIRACA III LT 230 kV ARAPIRACA III /PENEDO C-1 AL | RB | FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL | 061/2001 | IPCA | RBNI | REA 10134/2021 | 8/15/2016 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Arapiraca III, associada à linha de transmissão 230 kV Arapiraca III – Penedo. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ARAPIRACA III | EL 230 kV ARAPIRACA III LT 230 kV ARAPIRACA III /PENEDO C-1 AL | RB | FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/11/2022 | 11/10/2037 | R$5,986.58 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ARAPIRACA III | BC 230 kV 30 Mvar ARAPIRACA III BC2 AL | RB | FT BC 230 kV 30 Mvar ARAPIRACA III BC2 AL | 013/2010 | IPCA | RBL | CC 013/2010 | 6/17/2013 | 10/6/2040 | R$755,923.37 | 6/1/2025 | Ativa | T2010-083 | Construção da SE 230/69 kV Arapiraca III, com 100 MVA, alimentada a partir do seccionamento da LT 230 kV Rio Largo II – Penedo. *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | ARAPIRACA III | BC 230 kV 30 Mvar ARAPIRACA III BC1 AL | RB | FT BC 230 kV 30 Mvar ARAPIRACA III BC1 AL | 013/2010 | IPCA | RBL | CC 013/2010 | 6/17/2013 | 10/6/2040 | R$755,923.37 | 6/1/2025 | Ativa | T2010-083 | Construção da SE 230/69 kV Arapiraca III, com 100 MVA, alimentada a partir do seccionamento da LT 230 kV Rio Largo II – Penedo. *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Norte | ARARAQUARA 2 | MC 500 kV CV 600/600 kV ARARAQUARA 2 CC2 SP | RB | FT CV 600/600 kV ARARAQUARA 2 CC1 SP | 012/2009 | IPCA | RBL | CC 012/2009 | 4/1/2013 | 2/26/2039 | R$758,484.40 | 6/1/2025 | Ativa | T2009-216 | Contrato de Concessão nº 012/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | ARARAQUARA 2 | MC 500 kV CV 600/600 kV ARARAQUARA 2 CC1 SP | RB | FT CV 600/600 kV ARARAQUARA 2 CC1 SP | 012/2009 | IPCA | RBL | CC 012/2009 | 4/1/2013 | 2/26/2039 | R$758,484.40 | 6/1/2025 | Ativa | T2009-216 | Contrato de Concessão nº 012/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | ARARAQUARA 2 | MC 500 kV BF 500 kV 305 Mvar ARARAQUARA 2 GF4 SP | RB | FT CV 600/600 kV ARARAQUARA 2 CC1 SP | 012/2009 | IPCA | RBL | CC 012/2009 | 4/1/2013 | 2/26/2039 | R$673,511.45 | 6/1/2025 | Ativa | T2009-216 | Contrato de Concessão nº 012/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | ARARAQUARA 2 | MC 500 kV BF 500 kV 305 Mvar ARARAQUARA 2 GF3 SP | RB | FT CV 600/600 kV ARARAQUARA 2 CC1 SP | 012/2009 | IPCA | RBL | CC 012/2009 | 4/1/2013 | 2/26/2039 | R$673,511.45 | 6/1/2025 | Ativa | T2009-216 | Contrato de Concessão nº 012/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | ARARAQUARA 2 | MC 500 kV BF 500 kV 305 Mvar ARARAQUARA 2 GF2 SP | RB | FT CV 600/600 kV ARARAQUARA 2 CC1 SP | 012/2009 | IPCA | RBL | CC 012/2009 | 4/1/2013 | 2/26/2039 | R$673,511.45 | 6/1/2025 | Ativa | T2009-216 | Contrato de Concessão nº 012/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | ARARAQUARA 2 | MC 500 kV BF 500 kV 305 Mvar ARARAQUARA 2 GF1 SP | RB | FT CV 600/600 kV ARARAQUARA 2 CC1 SP | 012/2009 | IPCA | RBL | CC 012/2009 | 4/1/2013 | 2/26/2039 | R$673,511.45 | 6/1/2025 | Ativa | T2009-216 | Contrato de Concessão nº 012/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | ARARAQUARA 2 | IB 500 kV MG 500 kV ARARAQUARA 2 MG2 SP IB9 | RB | FT MG 500 kV ARARAQUARA 2 MG2 SP | 012/2009 | IPCA | RBL | CC 012/2009 | 4/1/2013 | 2/26/2039 | R$292,245.30 | 6/1/2025 | Ativa | T2009-216 | Contrato de Concessão nº 012/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | ARARAQUARA 2 | IB 500 kV MG 500 kV ARARAQUARA 2 MG2 SP IB8 | RB | FT MG 500 kV ARARAQUARA 2 MG2 SP | 012/2009 | IPCA | RBL | CC 012/2009 | 4/1/2013 | 2/26/2039 | R$292,245.30 | 6/1/2025 | Ativa | T2009-216 | Contrato de Concessão nº 012/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | ARARAQUARA 2 | IB 500 kV MG 500 kV ARARAQUARA 2 MG2 SP IB7 | RB | FT CV 600/600 kV ARARAQUARA 2 CC1 SP | 012/2009 | IPCA | RBL | CC 012/2009 | 4/1/2013 | 2/26/2039 | R$292,245.30 | 6/1/2025 | Ativa | T2009-216 | Contrato de Concessão nº 012/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | ARARAQUARA 2 | IB 500 kV MG 500 kV ARARAQUARA 2 MG2 SP IB6 | RB | FT CV 600/600 kV ARARAQUARA 2 CC1 SP | 012/2009 | IPCA | RBL | CC 012/2009 | 4/1/2013 | 2/26/2039 | R$292,245.30 | 6/1/2025 | Ativa | T2009-216 | Contrato de Concessão nº 012/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | ARARAQUARA 2 | CV 600/600 kV ARARAQUARA 2 CC2 SP | RB | FT CV 600/600 kV ARARAQUARA 2 CC1 SP | 012/2009 | IPCA | RBL | CC 012/2009 | 4/1/2013 | 2/26/2039 | R$ 60,186,844.93 | 6/1/2025 | Ativa | T2009-216 | Contrato de Concessão nº 012/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | ARARAQUARA 2 | CV 600/600 kV ARARAQUARA 2 CC1 SP | RB | FT CV 600/600 kV ARARAQUARA 2 CC1 SP | 012/2009 | IPCA | RBL | CC 012/2009 | 4/1/2013 | 2/26/2039 | R$ 60,186,844.93 | 6/1/2025 | Ativa | T2009-216 | Contrato de Concessão nº 012/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | ARARAQUARA 2 | BF 500 kV 305 Mvar ARARAQUARA 2 GF4 SP | RB | FT CV 600/600 kV ARARAQUARA 2 CC1 SP | 012/2009 | IPCA | RBL | CC 012/2009 | 4/1/2013 | 2/26/2039 | R$ 9,481,874.97 | 6/1/2025 | Ativa | T2009-216 | Contrato de Concessão nº 012/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | ARARAQUARA 2 | BF 500 kV 305 Mvar ARARAQUARA 2 GF3 SP | RB | FT CV 600/600 kV ARARAQUARA 2 CC1 SP | 012/2009 | IPCA | RBL | CC 012/2009 | 4/1/2013 | 2/26/2039 | R$ 9,481,874.97 | 6/1/2025 | Ativa | T2009-216 | Contrato de Concessão nº 012/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | ARARAQUARA 2 | BF 500 kV 305 Mvar ARARAQUARA 2 GF2 SP | RB | FT CV 600/600 kV ARARAQUARA 2 CC1 SP | 012/2009 | IPCA | RBL | CC 012/2009 | 4/1/2013 | 2/26/2039 | R$ 9,481,874.97 | 6/1/2025 | Ativa | T2009-216 | Contrato de Concessão nº 012/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | ARARAQUARA 2 | BF 500 kV 305 Mvar ARARAQUARA 2 GF1 SP | RB | FT CV 600/600 kV ARARAQUARA 2 CC1 SP | 012/2009 | IPCA | RBL | CC 012/2009 | 4/1/2013 | 2/26/2039 | R$ 9,481,874.97 | 6/1/2025 | Ativa | T2009-216 | Contrato de Concessão nº 012/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia | ARARAQUARA FURNAS | RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RTPC SP | RB | FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$571,139.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ARARAQUARA FURNAS | RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RTPC SP | RB | FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RMELP | REA 11449/2022 | R$ 2,493,635.42 | 6/1/2025 | Prevista | T2022-047 | Obra de Substituição Completa - Substituir na SE Araraquara FUR o reator monofásico - RTPC - 500 kV - 3x24,4667 MVAr por outro de 3x24,4667 MVAr.As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia | ARARAQUARA FURNAS | RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RTCA SP | RB | FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$571,139.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ARARAQUARA FURNAS | RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RTCA SP | RB | FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | 062/2001 | IPCA | RMELP | REA 11449/2022 | R$ 2,493,635.42 | 6/1/2025 | Prevista | T2022-050 | Obra de Substituição Completa - Substituir na SE Araraquara FUR o reator monofásico - RTCA - 500 kV - 3x24,4667 MVAr por outro de 3x24,4667 MVAr.As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | 4T25 | |||
| AXIA Energia | ARARAQUARA FURNAS | RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RMR2 SP | RB | FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$571,139.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ARARAQUARA FURNAS | RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RMR2 SP | RB | FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP | 062/2001 | IPCA | RMELP | REA 11449/2022 | R$ 2,493,635.42 | 6/1/2025 | Prevista | T2022-049 | Obra de Substituição Completa - Substituir na SE Araraquara FUR o reator monofásico - RMR2 - 500 kV - 3x24,4667 MVAr por outro de 3x24,4667 MVAr.As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | 3T25 | |||
| AXIA Energia | ARARAQUARA FURNAS | RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RMR2 SP | RB | FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 8/17/2017 | 8/16/2041 | R$63,280.60 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ARARAQUARA FURNAS | RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RMR1 SP | RB | FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$571,139.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ARARAQUARA FURNAS | RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RMR1 SP | RB | FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,191,676.16 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ARARAQUARA FURNAS | RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RMR1 SP | RB | FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP | 062/2001 | IPCA | RMELP | REA 11449/2022 | R$ 2,493,635.42 | 6/1/2025 | Prevista | T2022-048 | Obra de Substituição Completa - Substituir na SE Araraquara FUR o reator monofásico - RMR1 - 500 kV- 3x24,4667 MVAr por outro de 3x24,4667 MVAr.As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | 4T25 | |||
| AXIA Energia | ARARAQUARA FURNAS | RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RMR1 SP | RB | FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/6/2017 | 7/5/2041 | R$62,997.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ARARAQUARA FURNAS | RTL 500 kV 27 Mvar ARARAQUARA FURNAS RTR1 SP | RB | FT RTL 500 kV 27 Mvar ARARAQUARA FURNAS RTR1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$190,379.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ARARAQUARA FURNAS | RTL 500 kV 27 Mvar ARARAQUARA FURNAS RTR1 SP | RB | FT RTL 500 kV 27 Mvar ARARAQUARA FURNAS RTR1 SP | 062/2001 | IPCA | RMELP | REA 12637/2022 | R$863,409.89 | 6/1/2025 | Prevista | T2022-104 | Obra de Substituição Completa - Substituição, na SE ARARAQUARA FURNAS, de um Reatores de Linha Monofásico RTR1 500 kV -27 Mvar por outro de mesma potência. | 4T25 | |||
| AXIA Energia | ARARAQUARA FURNAS | MG 500 kV ARARAQUARA FURNAS MG1 SP | RB | FT MG 500 kV ARARAQUARA FURNAS MG1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$863,143.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ARARAQUARA FURNAS | MG 500 kV ARARAQUARA FURNAS MG1 SP | RB | FT MG 500 kV ARARAQUARA FURNAS MG1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/31/2017 | 3/27/2033 | R$ 647.02 | 6/1/2025 | Ativa | Substituição de IHMs do Sistema de Supervisão e Controle Local (SAGE) por obsolescência ou por atualização tecnológica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ARARAQUARA FURNAS | MG 500 kV ARARAQUARA FURNAS MG1 SP | RB | FT MG 500 kV ARARAQUARA FURNAS MG1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 7/13/2017 | 4/8/2032 | R$7,669.36 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ARARAQUARA FURNAS | MG 500 kV ARARAQUARA FURNAS MG1 SP | RB | FT MG 500 kV ARARAQUARA FURNAS MG1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/6/2016 | 3/5/2032 | R$ 1,386,158.75 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ARARAQUARA FURNAS | MC 500 kV RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RTPC SP | RB | FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,673.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ARARAQUARA FURNAS | MC 500 kV RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RTCA SP | RB | FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,673.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ARARAQUARA FURNAS | MC 500 kV RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RMR2 SP | RB | FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,673.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ARARAQUARA FURNAS | MC 500 kV RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RMR1 SP | RB | FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,673.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ARARAQUARA FURNAS | EL 500 kV ARARAQUARA FURNAS LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP | RB | FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ARARAQUARA FURNAS | EL 500 kV ARARAQUARA FURNAS LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP | RB | FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 8/17/2017 | 8/16/2041 | R$63,280.60 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ARARAQUARA FURNAS | EL 500 kV ARARAQUARA FURNAS LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP | RB | FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ARARAQUARA FURNAS | EL 500 kV ARARAQUARA FURNAS LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP | RB | FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/6/2017 | 7/5/2041 | R$62,997.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ARARAQUARA FURNAS | EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG | RB | FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ARARAQUARA FURNAS | EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG | RB | FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/7/2016 | 12/1/2039 | R$13,834.88 | 6/1/2025 | Ativa | Substituição do pararraios LT Araraquara - Poços de Caldas Fase A - Nº Oper: LTARPC - PMI (000751/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ARARAQUARA FURNAS | EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG | RB | FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/7/2016 | 12/1/2039 | R$13,834.88 | 6/1/2025 | Ativa | Substituição do pararraios LT Araraquara - Poços de Caldas Fase B - Nº Oper: LTARPC - PMI (000752/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ARARAQUARA FURNAS | EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG | RB | FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/7/2016 | 12/1/2039 | R$13,834.88 | 6/1/2025 | Ativa | Substituição do pararraios LT Araraquara - Poços de Caldas Fase C - Nº Oper: LTARPC - PMI (000753/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ARARAQUARA FURNAS | EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG | RB | FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/7/2016 | 12/1/2039 | R$13,834.88 | 6/1/2025 | Ativa | Substituição do pararraios do banco de reatores da LT Araraquara - Poços de Caldas Fase A - Nº Oper: LTARPC - PMI (000757/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ARARAQUARA FURNAS | EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG | RB | FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/7/2016 | 12/1/2039 | R$13,834.88 | 6/1/2025 | Ativa | Substituição do pararraios do banco de reatores da LT Araraquara - Poços de Caldas Fase B - Nº Oper: LTARPC - PMI (000758/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ARARAQUARA FURNAS | EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG | RB | FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/7/2016 | 12/1/2039 | R$13,834.88 | 6/1/2025 | Ativa | Substituição do pararraios do banco de reatores da LT Araraquara - Poços de Caldas Fase C - Nº Oper: LTARPC - PMI (000759/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ARARAQUARA FURNAS | EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | RB | FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ARARAQUARA FURNAS | EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | RB | FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 10/16/2016 | 10/15/2039 | R$13,801.41 | 6/1/2025 | Ativa | Substituição do pararraios LT Araraquara - Campinas Fase A - Nº Oper: LTARCA- PMI (000748/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ARARAQUARA FURNAS | EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | RB | FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 10/16/2016 | 10/15/2039 | R$13,801.41 | 6/1/2025 | Ativa | Substituição do pararraios LT Araraquara - Campinas Fase B - Nº Oper: LTARCA- PMI (000749/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ARARAQUARA FURNAS | EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | RB | FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 10/16/2016 | 10/15/2039 | R$13,801.41 | 6/1/2025 | Ativa | Substituição do pararraios LT Araraquara - Campinas Fase C - Nº Oper: LTARCA- PMI (000750/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ARARAQUARA FURNAS | EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | RB | FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 10/16/2016 | 10/15/2039 | R$13,801.41 | 6/1/2025 | Ativa | Substituição do pararraios do banco de reatores da LT Araraquara - Campinas Fase A - Nº Oper: LTARCA- PMI (000754/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ARARAQUARA FURNAS | EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | RB | FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 10/16/2016 | 10/15/2039 | R$13,801.41 | 6/1/2025 | Ativa | Substituição do pararraios do banco de reatores da LT Araraquara - Campinas Fase B - Nº Oper: LTARCA- PMI (000755/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ARARAQUARA FURNAS | EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | RB | FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 10/16/2016 | 10/15/2039 | R$13,801.41 | 6/1/2025 | Ativa | Substituição do pararraios do banco de reatores da LT Araraquara - Campinas Fase C - Nº Oper: LTARCA- PMI (000756/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | AREIA | TR 500/230 kV AREIA TRR1 PR | RB | FT TR 500/230 kV AREIA TRR1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$558,003.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | AREIA | TR 500/230 kV AREIA TR2 PR | RB | FT TR 500/230 kV AREIA TR2 PR | 057/2001 | IPCA | RMEL | REA 10921/2021 | 11/24/2024 | 11/23/2059 | R$ 10,057,091.67 | 6/1/2025 | Ativa | T2021-103 | Obra de Substituição Completa - Substituir na SE Areia o transformador monofásico Fases A, B e C - TF2 - 525/230 kV - 672 MVA por outro de 672 MVA. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Sul | AREIA | MG 500 kV AREIA MG2 PR | RB | FT MG 500 kV AREIA MG2 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,719,932.55 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | AREIA | MG 500 kV AREIA MG2 PR | RB | FT MG 500 kV AREIA MG2 PR | 057/2001 | IPCA | RMEL | REN 643/2014 | 12/8/2013 | 12/7/2030 | R$17,526.21 | 6/1/2025 | Ativa | Substituição de 2 baterias 48 Vcc. Incluída após Recurso em face da REH 1.918/2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | AREIA | MG 500 kV AREIA MG2 PR | RB | FT MG 500 kV AREIA MG2 PR | 057/2001 | IPCA | RMEL | REN 643/2014 | 10/13/2014 | 10/12/2031 | R$12,667.21 | 6/1/2025 | Ativa | Substituição de 1 baterias 125-525 Vcc. (primeira de duas) Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | AREIA | MG 500 kV AREIA MG2 PR | RB | FT MG 500 kV AREIA MG2 PR | 057/2001 | IPCA | RMEL | REN 643/2014 | 10/14/2014 | 10/13/2031 | R$12,669.41 | 6/1/2025 | Ativa | Substituição de 1 baterias 125-525 Vcc. (segunda de duas) Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | AREIA | MG 500 kV AREIA MG2 PR | RB | FT MG 500 kV AREIA MG2 PR | 057/2001 | IPCA | RBNI | REA 6882/2018 | 3/30/2021 | 2/1/2046 | R$145,281.16 | 6/1/2025 | Ativa | T2017-108 | Adequação no Módulo Geral 230 kV da SE AREIA (Instalação de 3 TPCs na Barra P2 + Sistema de Proteção) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | AREIA | MG 500 kV AREIA MG2 PR | RB | FT MG 500 kV AREIA MG2 PR | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2034 | R$32,445.10 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Bateias, GBM 1 e 2, Campos Novos, Curitiba, Ivaiporã e Segredo * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | AREIA | MG 500 kV AREIA MG2 PR | RB | FT MG 500 kV AREIA MG2 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 8/25/2021 | 7/30/2044 | R$385,531.30 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | AREIA | MG 500 kV AREIA MG2 PR | RB | FT MG 500 kV AREIA MG2 PR | 057/2001 | IPCA | RBNI | DSP 1233/2022 | 10/31/2021 | 10/30/2038 | R$113,862.07 | 6/1/2025 | Ativa | Instalação de dois conjuntos de cubículos na SE Areia, em substituição aos cubículos e disjuntores 13,8 kV existentes, que serão desativados. Cada novo conjunto de cubículos será composto pelos seguintes equipamentos 15 kV: 1 Disjuntor, 1 Seccionadora, 3 TCs para proteção, 3 TCs para medição, 2 TPs e cabos associados. . Degradação e obsolescência de vários componentes. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | AREIA | MC 500 kV TR 500/230 kV AREIA TR2 PR | RB | FT TR 500/230 kV AREIA TR2 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$358,630.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | AREIA | MC 500 kV TR 500/230 kV AREIA TR2 PR | RB | FT TR 500/230 kV AREIA TR2 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 8/16/2021 | 8/15/2036 | R$105,702.84 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | AREIA | MC 230 kV TR 500/230 kV AREIA TR2 PR | RB | FT TR 500/230 kV AREIA TR2 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$126,634.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | AREIA | MC 230 kV TR 500/230 kV AREIA TR2 PR | RB | FT TR 500/230 kV AREIA TR2 PR | 057/2001 | IPCA | RBNI | REA 6882/2018 | 3/30/2021 | 2/20/2049 | R$274,186.18 | 6/1/2025 | Ativa | T2017-108 | Adequação no Módulo de Manobra - Conexão do Transformador 230 kV TR2 (CT TF-2) na SE AREIA de arranjo BPT para BD4 + Proteção de Barra Adaptativa e Proteção de Falha de Disjuntor *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | AREIA | MC 230 kV TR 500/230 kV AREIA TR2 PR | RB | FT TR 500/230 kV AREIA TR2 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 8/12/2021 | 9/5/2045 | R$108,258.91 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | AREIA | MC 230 kV TR 230/138 kV AREIA TR3 PR | RBF | FT TR 230/138 kV AREIA TR3 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$126,634.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | AREIA | MC 230 kV TR 230/138 kV AREIA TR3 PR | RBF | FT TR 230/138 kV AREIA TR3 PR | 057/2001 | IPCA | RBNI | REA 4347/2013 | 3/22/2015 | 3/24/2045 | R$37,660.39 | 6/1/2025 | Ativa | Substituição de 3 TCs de 230kV do TF3.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | AREIA | MC 230 kV TR 230/138 kV AREIA TR3 PR | RBF | FT TR 230/138 kV AREIA TR3 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$222,253.60 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | AREIA | MC 230 kV TR 230/138 kV AREIA TR3 PR | RBF | FT TR 230/138 kV AREIA TR3 PR | 057/2001 | IPCA | RBNI | REA 6882/2018 | 1/20/2021 | 1/19/2036 | R$47,938.40 | 6/1/2025 | Ativa | T2017-108 | Adequação no Módulo de Manobra - Conexão do Transformador 230 kV TR3 (CT TF-3 230/138 kV) na SE AREIA de arranjo BPT para BD4 + Proteção de Barra Adaptativa e Proteção de Falha de Disjuntor *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | AREIA | MC 230 kV TR 230/138 kV AREIA TR1 PR | RBF | FT TR 230/138 kV AREIA TR1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$126,634.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | AREIA | MC 230 kV TR 230/138 kV AREIA TR1 PR | RBF | FT TR 230/138 kV AREIA TR1 PR | 057/2001 | IPCA | RMEL | REN 643/2014 | 5/18/2014 | 5/20/2044 | R$12,000.82 | 6/1/2025 | Ativa | Substituição das CSs 755. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | AREIA | MC 230 kV TR 230/138 kV AREIA TR1 PR | RBF | FT TR 230/138 kV AREIA TR1 PR | 057/2001 | IPCA | RMEL | REN 643/2014 | 5/18/2014 | 5/20/2044 | R$12,000.82 | 6/1/2025 | Ativa | Substituição das CSs 753. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | AREIA | MC 230 kV TR 230/138 kV AREIA TR1 PR | RBF | FT TR 230/138 kV AREIA TR1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$222,253.60 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | AREIA | MC 230 kV TR 230/138 kV AREIA TR1 PR | RBF | FT TR 230/138 kV AREIA TR1 PR | 057/2001 | IPCA | RBNI | REA 6882/2018 | 1/20/2021 | 1/19/2036 | R$83,788.97 | 6/1/2025 | Ativa | T2017-108 | Adequação no Módulo de Manobra - Conexão do Transformador 230 kV TR1 (CT TF-1 230/138 kV) na SE AREIA de arranjo BPT para BD4 + Proteção de Barra Adaptativa e Proteção de Falha de Disjuntor *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | AREIA | MC 230 kV TR 230/138 kV AREIA TR1 PR | RBF | FT TR 230/138 kV AREIA TR1 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 7/16/2020 | 7/15/2044 | R$30,820.81 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | AREIA | IB 500 kV MG 500 kV AREIA MG2 PR IB5 | RB | FT MG 500 kV AREIA MG2 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | AREIA | IB 500 kV MG 500 kV AREIA MG2 PR IB4 | RB | FT MG 500 kV AREIA MG2 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | AREIA | IB 500 kV MG 500 kV AREIA MG2 PR IB3 | RB | FT MG 500 kV AREIA MG2 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | AREIA | IB 500 kV MG 500 kV AREIA MG2 PR IB2 | RB | FT MG 500 kV AREIA MG2 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | AREIA | IB 500 kV MG 500 kV AREIA MG2 PR IB1 | RB | FT MG 500 kV AREIA MG2 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | AREIA | IB 230 kV MG 500 kV AREIA MG2 PR IB1 | RB | FT MG 500 kV AREIA MG2 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$100,223.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | AREIA | IB 230 kV MG 500 kV AREIA MG2 PR IB1 | RB | FT MG 500 kV AREIA MG2 PR | 057/2001 | IPCA | RBNI | REA 6882/2018 | 3/30/2021 | 3/29/2061 | R$26,710.86 | 6/1/2025 | Ativa | T2017-108 | Adequação no Módulo de Manobra - Interligação de Barramento IB1 em 230 kV na SE AREIA de arranjo BPT para BD4 + Proteção de Barra Adaptativa e Proteção de Falha de Disjuntor *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | AREIA | EL 500 kV AREIA LT 500 kV AREIA /SEGREDO C-1 PR | RB | FT LT 500 kV AREIA /SEGREDO C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | AREIA | EL 500 kV AREIA LT 500 kV AREIA /SEGREDO C-1 PR | RB | FT LT 500 kV AREIA /SEGREDO C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$713,154.95 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | AREIA | EL 500 kV AREIA LT 500 kV AREIA /SEGREDO C-1 PR | RB | FT LT 500 kV AREIA /SEGREDO C-1 PR | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2034 | R$2,958.53 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Bateias, GBM 1 e 2, Campos Novos, Curitiba, Ivaiporã e Segredo * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | AREIA | EL 500 kV AREIA LT 500 kV AREIA /IVAIPORA C-1 PR | RB | FT LT 500 kV AREIA /IVAIPORA C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | AREIA | EL 500 kV AREIA LT 500 kV AREIA /IVAIPORA C-1 PR | RB | FT LT 500 kV AREIA /IVAIPORA C-1 PR | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2034 | R$2,958.53 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Bateias, GBM 1 e 2, Campos Novos, Curitiba, Ivaiporã e Segredo * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | AREIA | EL 500 kV AREIA LT 500 kV AREIA /CURITIBA C-1 PR | RB | FT LT 500 kV AREIA /CURITIBA C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | AREIA | EL 500 kV AREIA LT 500 kV AREIA /CURITIBA C-1 PR | RB | FT LT 500 kV AREIA /CURITIBA C-1 PR | 057/2001 | IPCA | RBNI | REA 5484/2015 | 10/28/2015 | 10/27/2043 | R$64,280.88 | 6/1/2025 | Ativa | Substituição das proteções * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | AREIA | EL 500 kV AREIA LT 500 kV AREIA /CURITIBA C-1 PR | RB | FT LT 500 kV AREIA /CURITIBA C-1 PR | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2034 | R$7,674.05 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Bateias, GBM 1 e 2, Campos Novos, Curitiba, Ivaiporã e Segredo * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | AREIA | EL 500 kV AREIA LT 500 kV AREIA /C.NOVOS C-1 PR/SC | RB | FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | AREIA | EL 500 kV AREIA LT 500 kV AREIA /C.NOVOS C-1 PR/SC | RB | FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC | 057/2001 | IPCA | RBNI | REA 5484/2015 | 10/28/2015 | 10/27/2039 | R$36,090.87 | 6/1/2025 | Ativa | Substituição de para-raios do vão CNO (PR-CNO) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | AREIA | EL 500 kV AREIA LT 500 kV AREIA /C.NOVOS C-1 PR/SC | RB | FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2034 | R$5,127.80 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Bateias, GBM 1 e 2, Campos Novos, Curitiba, Ivaiporã e Segredo * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | AREIA | EL 500 kV AREIA LT 500 kV AREIA /BENTO MUNHOZ C-2 PR | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | AREIA | EL 500 kV AREIA LT 500 kV AREIA /BENTO MUNHOZ C-2 PR | DIT | 057/2001 | IPCA | RCDM | REA 5861/2016 | 5/31/2019 | 5/30/2034 | R$2,958.53 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Bateias, GBM 1 e 2, Campos Novos, Curitiba, Ivaiporã e Segredo * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | AREIA | EL 500 kV AREIA LT 500 kV AREIA /BENTO MUNHOZ C-1 PR | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | AREIA | EL 500 kV AREIA LT 500 kV AREIA /BENTO MUNHOZ C-1 PR | DIT | 057/2001 | IPCA | RCDM | REA 5861/2016 | 5/31/2019 | 5/30/2034 | R$2,958.53 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Bateias, GBM 1 e 2, Campos Novos, Curitiba, Ivaiporã e Segredo * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | AREIA | EL 500 kV AREIA LT 500 kV AREIA /BATEIAS C-1 PR | RB | FT LT 500 kV AREIA /BATEIAS C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | AREIA | EL 500 kV AREIA LT 500 kV AREIA /BATEIAS C-1 PR | RB | FT LT 500 kV AREIA /BATEIAS C-1 PR | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2034 | R$8,995.73 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Bateias, GBM 1 e 2, Campos Novos, Curitiba, Ivaiporã e Segredo * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | AREIA | EL 230 kV AREIA LT 230 kV AREIA /S.MATEUS SUL C-1 PR | RB | FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | AREIA | EL 230 kV AREIA LT 230 kV AREIA /S.MATEUS SUL C-1 PR | RB | FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$323,005.58 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | AREIA | EL 230 kV AREIA LT 230 kV AREIA /S.MATEUS SUL C-1 PR | RB | FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR | 057/2001 | IPCA | RBNI | REA 6882/2018 | 1/20/2021 | 4/17/2042 | R$314,109.93 | 6/1/2025 | Ativa | T2017-108 | Adequação no Módulo de Manobra - Entrada de Linha 230 kV São Mateus do Sul na SE AREIA de arranjo BPT para BD4 + Proteção de Barra Adaptativa e Proteção de Falha de Disjuntor *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | AREIA | EL 230 kV AREIA LT 230 kV AREIA /S.MATEUS SUL C-1 PR | RB | FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR | 057/2001 | IPCA | RBNI | REA 5484/2015 | 8/18/2017 | 8/21/2047 | R$40,744.77 | 6/1/2025 | Ativa | Substituição de 3 transformador(es) de corrente do(s) vão(s): LT São Mateus do Sul (TC732). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | AREIA | EL 230 kV AREIA LT 230 kV AREIA /S.MATEUS SUL C-1 PR | RB | FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 7/17/2020 | 7/16/2053 | R$98,633.90 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | AREIA | EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-2 PR | RB | FT LT 230 kV AREIA /S. OSORIO C-2 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | AREIA | EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-2 PR | RB | FT LT 230 kV AREIA /S. OSORIO C-2 PR | 057/2001 | IPCA | RMEL | REN 643/2014 | 4/13/2014 | 4/12/2038 | R$17,739.99 | 6/1/2025 | Ativa | Substituição dos para-raios 230 kV de SiC do circuito Salto Osório 2. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | AREIA | EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-2 PR | RB | FT LT 230 kV AREIA /S. OSORIO C-2 PR | 057/2001 | IPCA | RBNI | REA 6882/2018 | 3/5/2021 | 5/24/2042 | R$321,806.01 | 6/1/2025 | Ativa | T2017-108 | Adequação no Módulo de Manobra - Entrada de Linha 230 kV Salto Osório 2 na SE AREIA de arranjo BPT para BD4 + Proteção de Barra Adaptativa e Proteção de Falha de Disjuntor *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | AREIA | EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-2 PR | RB | FT LT 230 kV AREIA /S. OSORIO C-2 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 3/31/2021 | 5/1/2042 | R$203,466.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | AREIA | EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-1 PR | RB | FT LT 230 kV AREIA /S. OSORIO C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | AREIA | EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-1 PR | RB | FT LT 230 kV AREIA /S. OSORIO C-1 PR | 057/2001 | IPCA | RMEL | REN 643/2014 | 6/9/2013 | 6/8/2037 | R$17,070.00 | 6/1/2025 | Ativa | Substituição dos para-raios 230 kV de SiC do circuito Salto Osório 1.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | AREIA | EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-1 PR | RB | FT LT 230 kV AREIA /S. OSORIO C-1 PR | 057/2001 | IPCA | RBNI | REA 6882/2018 | 1/25/2021 | 8/16/2054 | R$145,350.74 | 6/1/2025 | Ativa | T2017-108 | Adequação no Módulo de Manobra - Entrada de Linha 230 kV Salto Osório 1 na SE AREIA de arranjo BPT para BD4 + Proteção de Barra Adaptativa e Proteção de Falha de Disjuntor *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | AREIA | EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-1 PR | RB | FT LT 230 kV AREIA /S. OSORIO C-1 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 6/23/2021 | 6/22/2036 | R$86,755.95 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | AREIA | EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-1 PR | RB | FT LT 230 kV AREIA /S. OSORIO C-1 PR | 057/2001 | IPCA | RBNI | REA 6845/2018 | 7/17/2020 | 7/16/2053 | R$98,633.90 | 6/1/2025 | Ativa | Substituição de Disjuntor DJ722, referente a saída da LT 230 kV Areia - Salto Osório C2 (Fabricante: Magrini, Modelo: MHM245, N. Série: DJ7600031).. Equipamento de tecnologia obsoleta.Degradação e obsolescência de vários componentes, tais como capacitores, compressores de ar, sistemas hidráulicos. Riscos de danos às instalações devido à perda de confiabilidade. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | AREIA | EL 230 kV AREIA LT 230 kV AREIA /GUARAPUAVA OESTE C-1 PR | RB | FT LT 230 kV AREIA /GUARAPUAVA OESTE C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | AREIA | EL 230 kV AREIA LT 230 kV AREIA /GUARAPUAVA OESTE C-1 PR | RB | FT LT 230 kV AREIA /GUARAPUAVA OESTE C-1 PR | 057/2001 | IPCA | RMEL | REN 643/2014 | 12/10/2013 | 12/9/2037 | R$17,470.04 | 6/1/2025 | Ativa | Substituição dos para-raios 230 kV de SiC por ZnO do circuito Ponta Grossa Norte. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | AREIA | EL 230 kV AREIA LT 230 kV AREIA /GUARAPUAVA OESTE C-1 PR | RB | FT LT 230 kV AREIA /GUARAPUAVA OESTE C-1 PR | 057/2001 | IPCA | RBNI | REA 6882/2018 | 2/17/2021 | 8/19/2041 | R$303,157.93 | 6/1/2025 | Ativa | T2017-108 | Adequação no Módulo de Manobra - Entrada de Linha 230 kV Ponta Grossa Norte na SE AREIA de arranjo BPT para BD4 + Proteção de Barra Adaptativa e Proteção de Falha de Disjuntor *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | AREIA | EL 230 kV AREIA LT 230 kV AREIA /GUARAPUAVA OESTE C-1 PR | RB | FT LT 230 kV AREIA /GUARAPUAVA OESTE C-1 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 7/17/2020 | 7/16/2053 | R$98,633.90 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | ARIQUEMES | TR 230/69 kV ARIQUEMES TR3 RO | RBF | FT TR 230/69 kV ARIQUEMES TR3 RO | 058/2001 | IPCA | RBNI | REA 5678/2016 | 3/5/2018 | 8/18/2052 | R$ 1,703,508.89 | 6/1/2025 | Ativa | T2015-062 | Instalação de transformador trifásico, 230/69/13,8 kV, 60 MVA, na SE Ariquemes. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ARIQUEMES | TR 230/69 kV ARIQUEMES TR2 RO | RBF | FT TR 230/69 kV ARIQUEMES TR2 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$327,895.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ARIQUEMES | TR 230/69 kV ARIQUEMES TR1 RO | RBF | FT TR 230/69 kV ARIQUEMES TR1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$327,895.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ARIQUEMES | TR 230/69 kV ARIQUEMES TR1 RO | RBF | FT TR 230/69 kV ARIQUEMES TR1 RO | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 6/30/2016 | 6/29/2031 | R$108,797.04 | 6/1/2025 | Ativa | Implantacao de sistema de medicao e monitoramento online de Buchas Condensivas do equipamento PVTF601 para integrar ao SISTEMA DE SUPERVISAO SAGE Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | ARIQUEMES | RTN 230 kV 0 Mvar ARIQUEMES RN1 RO | RB | FT RTL 230 kV 20 Mvar ARIQUEMES RT1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$16,446.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ARIQUEMES | RTL 230 kV 20 Mvar ARIQUEMES RT3 RO | RB | FT RTL 230 kV 20 Mvar ARIQUEMES RT3 RO | 021/2009 | IPCA | RBL | CC 021/2009 | 10/28/2015 | 11/19/2039 | R$727,283.38 | 6/1/2025 | Ativa | T2009-245 | *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Norte | ARIQUEMES | RTL 230 kV 20 Mvar ARIQUEMES RT1 RO | RB | FT RTL 230 kV 20 Mvar ARIQUEMES RT1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$257,883.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ARIQUEMES | RTB 230 kV 20 Mvar ARIQUEMES RB1 RO | RB | FT RTB 230 kV 20 Mvar ARIQUEMES RB1 RO | 058/2001 | IPCA | RBNI | REA 7814/2019 | 5/13/2021 | 4/8/2053 | R$938,338.80 | 6/1/2025 | Ativa | T2018-095 | Instalação de Reator Trifásico de Barra 20 Mvar - 230 kV na SE Ariquemes *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ARIQUEMES | MG 230 kV ARIQUEMES MG1 RO | RB | FT MG 230 kV ARIQUEMES MG1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$498,314.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ARIQUEMES | MG 230 kV ARIQUEMES MG1 RO | RB | FT MG 230 kV ARIQUEMES MG1 RO | 058/2001 | IPCA | RBNI | REA 5678/2016 | 3/5/2018 | 11/4/2047 | R$60,267.07 | 6/1/2025 | Ativa | T2015-062 | Adequação do serviço auxiliar do módulo de infraestrutura geral, em 230 kV, da SE Ariquemes. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ARIQUEMES | MG 230 kV ARIQUEMES MG1 RO | RB | FT MG 230 kV ARIQUEMES MG1 RO | 058/2001 | IPCA | RBNI | REA 5678/2016 | 3/5/2018 | 6/27/2047 | R$200,576.22 | 6/1/2025 | Ativa | T2015-062 | Complementação do módulo geral da Subestação Ariquemes com um módulo de infraestrutura de manobra em 230 kV. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ARIQUEMES | MG 230 kV ARIQUEMES MG1 RO | RB | FT MG 230 kV ARIQUEMES MG1 RO | 058/2001 | IPCA | RBNI | REA 5678/2016 | 3/5/2018 | 6/28/2046 | R$56,015.21 | 6/1/2025 | Ativa | T2015-062 | Adequação do módulo de infraestrutura geral, em 69 kV, da SE Ariquemes com a instalação de um módulo de infraestrutura de manobra. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ARIQUEMES | MG 230 kV ARIQUEMES MG1 RO | RB | FT MG 230 kV ARIQUEMES MG1 RO | 058/2001 | IPCA | RBNI | REA 5678/2016 | 3/5/2018 | 6/28/2046 | R$56,015.21 | 6/1/2025 | Ativa | T2015-062 | Complementação do módulo geral da Subestação Ariquemes com um módulo de infraestrutura de manobra em 69 kV *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ARIQUEMES | MG 230 kV ARIQUEMES MG1 RO | RB | FT MG 230 kV ARIQUEMES MG1 RO | 058/2001 | IPCA | RMEL | REN 443/2011 | 9/1/2016 | 8/31/2033 | R$9,051.86 | 6/1/2025 | Ativa | MODERNIZAÇÃO DOS SERVIÇOS AUXILIARES CA E CC DAS SUBESTAÇÕES DO SISTEMA RONDONIA: CONTEMPLA SUBSTITUIÇÃO DE QUADROS, RETIFICADORES E BANCO DE BATERIAS. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | ARIQUEMES | MG 230 kV ARIQUEMES MG1 RO | RB | FT MG 230 kV ARIQUEMES MG1 RO | 058/2001 | IPCA | RBNI | REA 7814/2019 | 5/13/2021 | 12/5/2050 | R$217,407.90 | 6/1/2025 | Ativa | T2018-095 | Modulo de Infra estrutura de manobra ( 230 kV- BD4)na SE Ariquemes para instalação de Reator de Barra 20Mvar 230 kV *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ARIQUEMES | MG 230 kV ARIQUEMES MG1 RO | RB | FT MG 230 kV ARIQUEMES MG1 RO | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 12/17/2012 | 12/16/2040 | R$36,996.15 | 6/1/2025 | Ativa | 01 GPS E 02 RDPS DE 8 CANAIS ANALOGICOS E 32 DIGITAIS PROVIDO DE AQUISICAO DE FALTA POR ONDAS VIAJANTES PARA AS LINHAS LT SMAQ1 E LT AQJP1 Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | ARIQUEMES | MC 69 kV TR 230/69 kV ARIQUEMES TR3 RO | RBF | FT TR 230/69 kV ARIQUEMES TR3 RO | 058/2001 | IPCA | RBNI | REA 5678/2016 | 3/5/2018 | 5/1/2049 | R$588,109.09 | 6/1/2025 | Ativa | T2015-062 | Instalação do módulo de conexão de transformador 69 kV, arranjo barra principal e transferência, na SE Ariquemes. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ARIQUEMES | MC 69 kV TR 230/69 kV ARIQUEMES TR2 RO | RBF | FT TR 230/69 kV ARIQUEMES TR2 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$66,931.92 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ARIQUEMES | MC 69 kV TR 230/69 kV ARIQUEMES TR1 RO | RBF | FT TR 230/69 kV ARIQUEMES TR1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$66,931.92 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ARIQUEMES | MC 230 kV TR 230/69 kV ARIQUEMES TR3 RO | RBF | FT TR 230/69 kV ARIQUEMES TR3 RO | 058/2001 | IPCA | RBNI | REA 5678/2016 | 3/5/2018 | 6/17/2049 | R$ 1,424,988.36 | 6/1/2025 | Ativa | T2015-062 | Instalação do módulo de conexão de transformador 230 kV, arranjo barra dupla a 4 chaves, na SE Ariquemes. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ARIQUEMES | MC 230 kV TR 230/69 kV ARIQUEMES TR2 RO | RBF | FT TR 230/69 kV ARIQUEMES TR2 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$183,181.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ARIQUEMES | MC 230 kV TR 230/69 kV ARIQUEMES TR1 RO | RBF | FT TR 230/69 kV ARIQUEMES TR1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$183,181.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ARIQUEMES | MC 230 kV RTL 230 kV 20 Mvar ARIQUEMES RT3 RO | RB | FT RTL 230 kV 20 Mvar ARIQUEMES RT3 RO | 021/2009 | IPCA | RBL | CC 021/2009 | 10/28/2015 | 11/19/2039 | R$241,329.42 | 6/1/2025 | Ativa | T2009-245 | *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Norte | ARIQUEMES | MC 230 kV RTL 230 kV 20 Mvar ARIQUEMES RT1 RO | RB | FT RTL 230 kV 20 Mvar ARIQUEMES RT1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$109,485.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ARIQUEMES | MC 230 kV RTB 230 kV 20 Mvar ARIQUEMES RB1 RO | RB | FT RTB 230 kV 20 Mvar ARIQUEMES RB1 RO | 058/2001 | IPCA | RBNI | REA 7814/2019 | 5/13/2021 | 9/15/2052 | R$ 1,431,691.04 | 6/1/2025 | Ativa | T2018-095 | Instalação de Módulo de Conexão para Reator Trifasico de Barra 230 kV- 20 Mvar na SE Ariquemes *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | ARIQUEMES | IB 230 kV MG 230 kV ARIQUEMES MG1 RO IB1 | RB | FT MG 230 kV ARIQUEMES MG1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$158,618.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ARIQUEMES | EL 69 kV ARIQUEMES DIST1 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$82,599.24 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | ARIQUEMES | EL 230 kV ARIQUEMES LT 230 kV SAMUEL /ARIQUEMES C-3 RO | RB | FT LT 230 kV SAMUEL /ARIQUEMES C-3 RO | 021/2009 | IPCA | RBL | CC 021/2009 | 10/28/2015 | 11/19/2039 | R$736,472.88 | 6/1/2025 | Ativa | T2009-245 | *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Norte | ARIQUEMES | EL 230 kV ARIQUEMES LT 230 kV SAMUEL /ARIQUEMES C-1 RO | RB | FT LT 230 kV SAMUEL /ARIQUEMES C-1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$260,258.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | ARIQUEMES | EL 230 kV ARIQUEMES LT 230 kV ARIQUEMES /JI-PARANA C-3 RO | RB | FT LT 230 kV ARIQUEMES /JI-PARANA C-3 RO | 021/2009 | IPCA | RBL | CC 021/2009 | 10/28/2015 | 11/19/2039 | R$736,472.88 | 6/1/2025 | Ativa | T2009-245 | *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Norte | ARIQUEMES | EL 230 kV ARIQUEMES LT 230 kV ARIQUEMES /JARU C-1 RO | RB | FT LT 230 kV ARIQUEMES /JARU C-1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$260,258.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ASSIS | TR 440/230 kV ASSIS TRR1 SP | RB | FT TR 440/230 kV ASSIS TRR1 SP | 057/2001 | IPCA | RMEL | REA 10921/2021 | 11/22/2024 | 11/21/2059 | R$ 2,342,497.21 | 6/1/2025 | Ativa | T2021-102 | Obra de Substituição Completa - Substituir na SE Assis o transformador monofásico reserva TRR1, 440/230 kV, 112 MVA por outro de 112 MVA. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Sul | ASSIS | TR 440/230 kV ASSIS TR1 SP | RB | FT TR 440/230 kV ASSIS TR1 SP | 057/2001 | IPCA | RMEL | REA 10921/2021 | 11/22/2024 | 11/21/2059 | R$ 7,027,491.66 | 6/1/2025 | Ativa | T2021-101 | Obra de Substituição Completa - Substituir na SE Assis o transformador monofásico, TF1, 440/230 kV, 336 MA, Fases A, B e C por outro de336 MVA. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| TMT | ASSIS | RTL 500 kV 45,33 Mvar ASSIS RTR6 SP | RB | FT RTL 500 kV 45,33 Mvar ASSIS RTR6 SP | 004/2013 | IPCA | RBL | CC 004/2013 | 12/21/2016 | 8/14/2043 | R$583,728.86 | 6/1/2025 | Ativa | T2013-098 | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| TMT | ASSIS | RTL 500 kV 136 Mvar ASSIS RT6 SP | RB | FT LT 500 kV MARIMBONDO II /ASSIS C-1 MG/SP | 004/2013 | IPCA | RBL | CC 004/2013 | 12/21/2016 | 8/14/2043 | R$ 1,751,186.58 | 6/1/2025 | Ativa | T2013-098 | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| TMT | ASSIS | RTB 500 kV 45,33 Mvar ASSIS RTR7 SP | RB | FT RTB 500 kV 45,33 Mvar ASSIS RTR7 SP | 004/2013 | IPCA | RBL | CC 004/2013 | 12/21/2016 | 8/14/2043 | R$583,728.86 | 6/1/2025 | Ativa | T2013-098 | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| TMT | ASSIS | RTB 500 kV 136 Mvar ASSIS RT8 SP | RB | FT RTB 500 kV 136 Mvar ASSIS RT8 SP | 004/2013 | IPCA | RBL | CC 004/2013 | 12/21/2016 | 8/14/2043 | R$ 1,751,186.58 | 6/1/2025 | Ativa | T2013-098 | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| TMT | ASSIS | RTB 500 kV 136 Mvar ASSIS RT7 SP | RB | FT RTB 500 kV 136 Mvar ASSIS RT7 SP | 004/2013 | IPCA | RBL | CC 004/2013 | 12/21/2016 | 8/14/2043 | R$ 1,751,186.58 | 6/1/2025 | Ativa | T2013-098 | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | ASSIS | MG 440 kV ASSIS MG2 SP | RB | FT MG 440 kV ASSIS MG2 SP | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$329,079.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| TMT | ASSIS | MC 500 kV RTL 500 kV 136 Mvar ASSIS RT6 SP | RB | FT LT 500 kV MARIMBONDO II /ASSIS C-1 MG/SP | 004/2013 | IPCA | RBL | CC 004/2013 | 12/21/2016 | 8/14/2043 | R$217,681.18 | 6/1/2025 | Ativa | T2013-098 | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| TMT | ASSIS | MC 500 kV RTB 500 kV 136 Mvar ASSIS RT8 SP | RB | FT RTB 500 kV 136 Mvar ASSIS RT8 SP | 004/2013 | IPCA | RBL | CC 004/2013 | 12/21/2016 | 8/14/2043 | R$915,010.91 | 6/1/2025 | Ativa | T2013-098 | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| TMT | ASSIS | MC 500 kV RTB 500 kV 136 Mvar ASSIS RT7 SP | RB | FT RTB 500 kV 136 Mvar ASSIS RT7 SP | 004/2013 | IPCA | RBL | CC 004/2013 | 12/21/2016 | 8/14/2043 | R$915,010.91 | 6/1/2025 | Ativa | T2013-098 | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | ASSIS | MC 230 kV TR 440/230 kV ASSIS TR1 SP | RB | FT TR 440/230 kV ASSIS TR1 SP | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$140,136.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ASSIS | MC 230 kV TR 440/230 kV ASSIS TR1 SP | RB | FT TR 440/230 kV ASSIS TR1 SP | 057/2001 | IPCA | RMEL | REN 643/2014 | 10/20/2013 | 10/19/2037 | R$17,301.06 | 6/1/2025 | Ativa | Substituição dos para-raios de SiC do TF1.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | ASSIS | MC 230 kV TR 440/230 kV ASSIS TR1 SP | RB | FT TR 440/230 kV ASSIS TR1 SP | 057/2001 | IPCA | RMEL | REN 905/2020 | 12/23/2020 | 12/22/2035 | R$178,077.12 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| TMT | ASSIS | IB 500 kV MG 500 kV ASSIS MG4 SP IB3 | RB | FT MG 500 kV ASSIS MG4 SP | 004/2013 | IPCA | RBL | CC 004/2013 | 12/21/2016 | 8/14/2043 | R$ 1,045,917.68 | 6/1/2025 | Ativa | T2013-098 | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | ASSIS | IB 230 kV MG 440 kV ASSIS MG2 SP IB1 | RB | FT MG 440 kV ASSIS MG2 SP | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,146.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ASSIS | IB 230 kV MG 440 kV ASSIS MG2 SP IB1 | RB | FT MG 440 kV ASSIS MG2 SP | 057/2001 | IPCA | RMEL | REN 905/2020 | 6/22/2021 | 6/21/2036 | R$16,906.04 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| TMT | ASSIS | EL 500 kV ASSIS LT 500 kV MARIMBONDO II /ASSIS C-1 MG/SP | RB | FT LT 500 kV MARIMBONDO II /ASSIS C-1 MG/SP | 004/2013 | IPCA | RBL | CC 004/2013 | 12/21/2016 | 8/14/2043 | R$ 1,105,526.09 | 6/1/2025 | Ativa | T2013-098 | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | ASSIS | EL 230 kV ASSIS LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR | RB | FT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$195,444.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ASSIS | EL 230 kV ASSIS LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR | RB | FT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$343,021.80 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ASSIS | EL 230 kV ASSIS LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR | RB | FT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR | 057/2001 | IPCA | RMEL | REN 443/2011 | 9/1/2016 | 8/31/2040 | R$19,570.73 | 6/1/2025 | Ativa | Substituição dos para-raios de SiC pro ZnO do circuito LON * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | ASSIS | EL 230 kV ASSIS LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR | RB | FT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR | 057/2001 | IPCA | RBNI | REA 7576/2019 | 12/14/2020 | 12/13/2035 | R$110,735.44 | 6/1/2025 | Ativa | T2018-096 | Adequação, na Subestação Assis, da Entrada de Linha 230 kV para a Subestação Londrina COPEL em função do seccionamento da LT 230 kV Assis - Londrina ESUL na Subestação Londrina COPEL. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | ASSIS | EL 230 kV ASSIS LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR | RB | FT LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$195,444.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ASSIS | EL 230 kV ASSIS LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR | RB | FT LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$343,021.80 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ASSIS | EL 230 kV ASSIS LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR | RB | FT LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 5/19/2016 | 8/14/2042 | R$46,330.62 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ATIBAIA 2 | EL 345 kV ATIBAIA 2 LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG | RB | FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RBNI | REA 4420/2013 | 9/10/2013 | 12/31/2042 | R$757,073.18 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 345 kV, arranjo disjuntor e meio, na subestação Atibaia II, associada à linha de transmissão 345 kV Atibaia II / Poços de Caldas. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ATIBAIA 2 | EL 345 kV ATIBAIA 2 LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP | RB | FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RBNI | REA 4420/2013 | 9/10/2013 | 12/31/2042 | R$757,073.18 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 345 kV, arranjo disjuntor e meio, na subestação Atibaia II, associada à linha de transmissão 345 kV Atibaia II / Mogi das Cruzes. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | ATLANTIDA 2 | TR 230/69 kV ATLANTIDA 2 TR3 RS | RBF | FT TR 230/69 kV ATLANTIDA 2 TR3 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$281,008.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ATLANTIDA 2 | TR 230/69 kV ATLANTIDA 2 TR2 RS | RBF | FT TR 230/69 kV ATLANTIDA 2 TR2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$281,008.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ATLANTIDA 2 | TR 230/69 kV ATLANTIDA 2 TR1 RS | RBF | FT TR 230/69 kV ATLANTIDA 2 TR1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$281,008.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ATLANTIDA 2 | MG 230 kV ATLANTIDA 2 MG1 RS | RB | FT MG 230 kV ATLANTIDA 2 MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$433,887.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ATLANTIDA 2 | MG 230 kV ATLANTIDA 2 MG1 RS | RB | FT MG 230 kV ATLANTIDA 2 MG1 RS | 057/2001 | IPCA | RMEL | REN 643/2014 | 10/6/2014 | 10/5/2031 | R$8,373.23 | 6/1/2025 | Ativa | Substituição de 2 baterias 125 Vcc. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | ATLANTIDA 2 | MG 230 kV ATLANTIDA 2 MG1 RS | RB | FT MG 230 kV ATLANTIDA 2 MG1 RS | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/2/2019 | 5/1/2036 | R$23,281.41 | 6/1/2025 | Ativa | Instalação de 2 carregadores de baterias de 48 Vcc * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | ATLANTIDA 2 | MG 230 kV ATLANTIDA 2 MG1 RS | RB | FT MG 230 kV ATLANTIDA 2 MG1 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 10/31/2022 | 10/30/2037 | R$32,441.79 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | ATLANTIDA 2 | MC 69 kV TR 230/69 kV ATLANTIDA 2 TR3 RS | RBF | FT TR 230/69 kV ATLANTIDA 2 TR3 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$54,243.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ATLANTIDA 2 | MC 69 kV TR 230/69 kV ATLANTIDA 2 TR2 RS | RBF | FT TR 230/69 kV ATLANTIDA 2 TR2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$54,243.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ATLANTIDA 2 | MC 69 kV TR 230/69 kV ATLANTIDA 2 TR1 RS | RBF | FT TR 230/69 kV ATLANTIDA 2 TR1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$54,243.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ATLANTIDA 2 | MC 230 kV TR 230/69 kV ATLANTIDA 2 TR3 RS | RBF | FT TR 230/69 kV ATLANTIDA 2 TR3 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ATLANTIDA 2 | MC 230 kV TR 230/69 kV ATLANTIDA 2 TR2 RS | RBF | FT TR 230/69 kV ATLANTIDA 2 TR2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ATLANTIDA 2 | MC 230 kV TR 230/69 kV ATLANTIDA 2 TR1 RS | RBF | FT TR 230/69 kV ATLANTIDA 2 TR1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ATLANTIDA 2 | IB 69 kV MG 230 kV ATLANTIDA 2 MG1 RS IB2 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$36,457.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | ATLANTIDA 2 | IB 230 kV MG 230 kV ATLANTIDA 2 MG1 RS IB1 | RB | FT MG 230 kV ATLANTIDA 2 MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,146.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ATLANTIDA 2 | EL 69 kV ATLANTIDA 2 DIST4 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,414.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | ATLANTIDA 2 | EL 69 kV ATLANTIDA 2 DIST3 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,414.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | ATLANTIDA 2 | EL 69 kV ATLANTIDA 2 DIST2 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,414.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | ATLANTIDA 2 | EL 69 kV ATLANTIDA 2 DIST1 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,414.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | ATLANTIDA 2 | EL 230 kV ATLANTIDA 2 LT 230 kV ATLANTIDA 2 /OSORIO 2 C-1 RS | RB | FT LT 230 kV ATLANTIDA 2 /OSORIO 2 C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ATLANTIDA 2 | EL 230 kV ATLANTIDA 2 LT 230 kV ATLANTIDA 2 /GRAVATAI 3 C-1 RS | RB | FT LT 230 kV ATLANTIDA 2 /GRAVATAI 3 C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | TR 500/230 kV B. ESPERANCA TRR1 PI | RB | FT TR 500/230 kV B. ESPERANCA TRR1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$485,024.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | TR 500/230 kV B. ESPERANCA TRR1 PI | RB | FT TR 500/230 kV B. ESPERANCA TRR1 PI | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,361,060.82 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | TR 500/230 kV B. ESPERANCA TRR1 PI | RB | FT TR 500/230 kV B. ESPERANCA TRR1 PI | 061/2001 | IPCA | RBNIA | REA 14820/2023 | R$ 2,250,796.48 | 6/1/2025 | Prevista | T2023-108 | Obra de Substituição Completa - Instalação de 1 Unidade de Autotransformador Monofásico Reserva, 500/230/13,8 kV, potência 150 MVA, em substituição à unidade 05TR, 100 MVA, existente. (Rotina-Substituição - o IdeMdl 13166 será substituído pelo novo equipamento). | 3T25 | |||
| AXIA Energia Nordeste | B. ESPERANCA | TR 500/230 kV B. ESPERANCA TR1 PI | RB | FT TR 500/230 kV B. ESPERANCA TR1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,455,073.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | TR 500/230 kV B. ESPERANCA TR1 PI | RB | FT TR 500/230 kV B. ESPERANCA TR1 PI | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,083,182.45 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | TR 500/230 kV B. ESPERANCA TR1 PI | RB | FT TR 500/230 kV B. ESPERANCA TR1 PI | 061/2001 | IPCA | RBNIA | REA 14820/2023 | R$ 6,752,389.46 | 6/1/2025 | Prevista | T2023-107 | Obra de Substituição Completa - Instalação de 1 Banco de Autotransformadores Monofásicos, 500/230/13,8 kV, potência 450 MVA (3x150 MVA) em substituição ao Banco 05T1, 300 MVA, existente.(Rotina-Substituição o IdeMdl 9554 será substituído pelo novo equipamento.) | 3T25 | |||
| AXIA Energia Nordeste | B. ESPERANCA | RTS 13,8 kV 5 Mvar B. ESPERANCA RT1 PI | RB | FT TR 500/230 kV B. ESPERANCA TR1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | RTS 13,8 kV 5 Mvar B. ESPERANCA RT1 PI | RB | FT TR 500/230 kV B. ESPERANCA TR1 PI | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$351,841.75 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | RTL 500 kV 33,33 Mvar B. ESPERANCA RTR2 PI | RB | FT RTL 500 kV 33,33 Mvar B. ESPERANCA RTR2 PI | 061/2001 | IPCA | RMEL | REA 9174/2020 | 4/18/2023 | 4/18/2059 | R$595,625.39 | 6/1/2025 | Ativa | T2020-041 | Obra de Substituição Completa - Substituição da unidade reserva de reator monofásico 500 kV, 33,3 MVA, do Banco de Reatores da Entrada de Linha para São João do Piauí (RTR2) na SE Boa Esperança. | ||
| AXIA Energia Nordeste | B. ESPERANCA | RTL 500 kV 100 Mvar B. ESPERANCA RT2 PI | RB | FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$674,361.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | RTL 500 kV 100 Mvar B. ESPERANCA RT2 PI | RB | FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI | 061/2001 | IPCA | RMEL | REN 643/2014 | 1/30/2014 | 1/9/2050 | R$9,491.58 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BUCHAS HSP 500 KV TIPO OTF DO REATOR 05E2 A Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | RTL 500 kV 100 Mvar B. ESPERANCA RT2 PI | RB | FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,892,372.88 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | RTL 500 kV 100 Mvar B. ESPERANCA RT2 PI | RB | FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI | 061/2001 | IPCA | RMEL | REA 9174/2020 | 3/31/2023 | 3/31/2057 | R$ 1,403,660.34 | 6/1/2025 | Ativa | T2020-041 | Obra de Substituição Parcial - Substituição de 02 unidades de reatores monofásicos 500 kV, de 33,3 MVA cada, das fases B e C, do Banco de Reatores da Entrada de Linha para P. Dutra (RT2) na SE Boa Esperança. | ||
| AXIA Energia Nordeste | B. ESPERANCA | RTL 500 kV 100 Mvar B. ESPERANCA RT1 PI | RB | FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$674,361.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | RTL 500 kV 100 Mvar B. ESPERANCA RT1 PI | RB | FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,892,372.88 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | RTB 500 kV 33,3 Mvar B. ESPERANCA RTR1 PI | RB | FT RTB 500 kV 33,3 Mvar B. ESPERANCA RTR1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$224,705.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | RTB 500 kV 33,3 Mvar B. ESPERANCA RTR1 PI | RB | FT RTB 500 kV 33,3 Mvar B. ESPERANCA RTR1 PI | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$630,561.16 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | RTB 500 kV 33,3 Mvar B. ESPERANCA RTR1 PI | RB | FT RTB 500 kV 33,3 Mvar B. ESPERANCA RTR1 PI | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/25/2021 | 9/24/2045 | R$18,074.97 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | RTB 500 kV 100 Mvar B. ESPERANCA RT3 PI | RB | FT RTB 500 kV 100 Mvar B. ESPERANCA RT3 PI | 061/2001 | IPCA | RMEL | REA 9174/2020 | 3/7/2023 | 3/7/2057 | R$ 2,105,490.50 | 6/1/2025 | Ativa | T2020-041 | Obra de Substituição Completa - Substituição do Banco de Reatores 500kV, 3x33,3 MVA, (RT3) na SE Boa Esperança. | ||
| AXIA Energia Nordeste | B. ESPERANCA | MG 500 kV B. ESPERANCA MG1 PI | RB | FT MG 500 kV B. ESPERANCA MG1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,269,306.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | MG 500 kV B. ESPERANCA MG1 PI | RB | FT MG 500 kV B. ESPERANCA MG1 PI | 061/2001 | IPCA | RMEL | REN 643/2014 | 8/20/2014 | 8/19/2031 | R$4,928.27 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCOS DE BATERIAS -48Vcc Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | MG 500 kV B. ESPERANCA MG1 PI | RB | FT MG 500 kV B. ESPERANCA MG1 PI | 061/2001 | IPCA | RMEL | REN 643/2014 | 8/11/2015 | 7/25/2041 | R$175,730.62 | 6/1/2025 | Ativa | Substituição de Sistema de Ar Comprimido, Posição Central 1.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | MG 500 kV B. ESPERANCA MG1 PI | RB | FT MG 500 kV B. ESPERANCA MG1 PI | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,561,889.48 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | MG 500 kV B. ESPERANCA MG1 PI | RB | FT MG 500 kV B. ESPERANCA MG1 PI | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 3,283,626.91 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | MG 500 kV B. ESPERANCA MG1 PI | RB | FT MG 500 kV B. ESPERANCA MG1 PI | 061/2001 | IPCA | RMEL | REN 443/2011 | 1/13/2016 | 1/12/2033 | R$11,748.43 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BATERIAS - 125Vcc * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | MG 500 kV B. ESPERANCA MG1 PI | RB | FT MG 500 kV B. ESPERANCA MG1 PI | 061/2001 | IPCA | RBNI | REA 8314/2019 | 5/25/2018 | 5/24/2033 | R$2,105.10 | 6/1/2025 | Ativa | Substituição do Concentrador de Dados (Sistema SCADA) para atendimento ao aumento da observabilidade associada ao Procedimento de Rede 2.7. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | MG 500 kV B. ESPERANCA MG1 PI | RB | FT MG 500 kV B. ESPERANCA MG1 PI | 061/2001 | IPCA | RBNI | REA 7761/2019 | 9/30/2015 | 3/25/2032 | R$33,419.79 | 6/1/2025 | Ativa | Implantação de Sistema para acesso remoto a dispositivos de Proteção, Controle e Automação. Sistema composto de Painel com PCs Industriais (1 Concentrador, 1 Firewall, 1 Receptor GPS, 1 Switch Gerenciável) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | MG 500 kV B. ESPERANCA MG1 PI | RB | FT MG 500 kV B. ESPERANCA MG1 PI | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/5/2019 | 8/7/2035 | R$254,448.73 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | MC 500 kV TR 500/230 kV B. ESPERANCA TR1 PI | RB | FT TR 500/230 kV B. ESPERANCA TR1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$414,502.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | MC 500 kV TR 500/230 kV B. ESPERANCA TR1 PI | RB | FT TR 500/230 kV B. ESPERANCA TR1 PI | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,163,163.61 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | MC 500 kV TR 500/230 kV B. ESPERANCA TR1 PI | RB | FT TR 500/230 kV B. ESPERANCA TR1 PI | 061/2001 | IPCA | RMEL | REN 443/2011 | 6/4/2016 | 6/7/2046 | R$32,395.17 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC 500KV, TIPO AKOF, DE FABRICAÇAO SIEMENS * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018. RAP alterada no recurso apresentado face a REH 2.258/2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | MC 500 kV TR 500/230 kV B. ESPERANCA TR1 PI | RB | FT TR 500/230 kV B. ESPERANCA TR1 PI | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/10/2021 | 10/20/2051 | R$414,404.68 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | MC 500 kV RTL 500 kV 100 Mvar B. ESPERANCA RT2 PI | RB | FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$251,123.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | MC 500 kV RTL 500 kV 100 Mvar B. ESPERANCA RT2 PI | RB | FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/22/2021 | 11/21/2045 | R$57,174.30 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | MC 500 kV RTL 500 kV 100 Mvar B. ESPERANCA RT1 PI | RB | FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$251,123.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | MC 500 kV RTL 500 kV 100 Mvar B. ESPERANCA RT1 PI | RB | FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/26/2021 | 11/25/2045 | R$57,194.25 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | MC 500 kV RTB 500 kV 100 Mvar B. ESPERANCA RT3 PI | RB | FT RTB 500 kV 100 Mvar B. ESPERANCA RT3 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$388,096.61 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | MC 500 kV RTB 500 kV 100 Mvar B. ESPERANCA RT3 PI | RB | FT RTB 500 kV 100 Mvar B. ESPERANCA RT3 PI | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/21/2022 | 8/20/2053 | R$308,776.37 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | MC 230 kV TR 500/230 kV B. ESPERANCA TR1 PI MC2 | RB | FT TR 500/230 kV B. ESPERANCA TR1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | MC 230 kV TR 500/230 kV B. ESPERANCA TR1 PI MC1 | RB | FT TR 500/230 kV B. ESPERANCA TR1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | MC 230 kV TR 500/230 kV B. ESPERANCA TR1 PI MC1 | RB | FT TR 500/230 kV B. ESPERANCA TR1 PI | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/1/2021 | 10/31/2045 | R$34,147.55 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | MC 13,8 kV RTS 13,8 kV 5 Mvar B. ESPERANCA RT1 PI | RB | FT TR 500/230 kV B. ESPERANCA TR1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$37,390.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | IB 500 kV MG 500 kV B. ESPERANCA MG1 PI IB3 | RB | FT MG 500 kV B. ESPERANCA MG1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$439,875.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | IB 500 kV MG 500 kV B. ESPERANCA MG1 PI IB2 | RB | FT MG 500 kV B. ESPERANCA MG1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$439,875.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | IB 500 kV MG 500 kV B. ESPERANCA MG1 PI IB2 | RB | FT MG 500 kV B. ESPERANCA MG1 PI | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,234,365.24 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | IB 500 kV MG 500 kV B. ESPERANCA MG1 PI IB2 | RB | FT MG 500 kV B. ESPERANCA MG1 PI | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/18/2021 | 4/26/2053 | R$426,206.00 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | IB 500 kV MG 500 kV B. ESPERANCA MG1 PI IB1 | RB | FT MG 500 kV B. ESPERANCA MG1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$439,875.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | IB 500 kV MG 500 kV B. ESPERANCA MG1 PI IB1 | RB | FT MG 500 kV B. ESPERANCA MG1 PI | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,234,365.24 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | IB 500 kV MG 500 kV B. ESPERANCA MG1 PI IB1 | RB | FT MG 500 kV B. ESPERANCA MG1 PI | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,137,933.94 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | IB 500 kV MG 500 kV B. ESPERANCA MG1 PI IB1 | RB | FT MG 500 kV B. ESPERANCA MG1 PI | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/2/2022 | 10/3/2053 | R$452,381.00 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | IB 230 kV MG 500 kV B. ESPERANCA MG1 PI IB1 | RB | FT MG 500 kV B. ESPERANCA MG1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,085.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | IB 230 kV MG 500 kV B. ESPERANCA MG1 PI IB1 | RB | FT MG 500 kV B. ESPERANCA MG1 PI | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/7/2022 | 2/6/2055 | R$190,862.81 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | EL 500 kV B. ESPERANCA LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI | RB | FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$469,641.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | EL 500 kV B. ESPERANCA LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI | RB | FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI | 061/2001 | IPCA | RMEL | REN 443/2011 | 8/1/2017 | 7/31/2045 | R$14,105.53 | 6/1/2025 | Ativa | SUBSTITUIÇÃO 01 RELÉ DE PROTEÇÃO DIGITAL UP21SX (PROTEÇÃO ALTERNADA) DA LT 05C6 B. ESPERANÇA/ SÃO JOÃO DO PIAUÍ 500KV. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | EL 500 kV B. ESPERANCA LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI | RB | FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/7/2021 | 5/5/2050 | R$399,036.29 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | EL 500 kV B. ESPERANCA LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI | RB | FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$469,641.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | EL 500 kV B. ESPERANCA LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI | RB | FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI | 061/2001 | IPCA | RMEL | REN 443/2011 | 6/4/2016 | 6/7/2046 | R$16,197.58 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC 500KV, TIPO AKOF, DE FABRICAÇAO SIEMENS * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | EL 500 kV B. ESPERANCA LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI | RB | FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/15/2021 | 3/19/2052 | R$313,884.68 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | EL 230 kV B. ESPERANCA LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI | RB | FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | EL 230 kV B. ESPERANCA LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI | RB | FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/22/2014 | 12/10/2045 | R$49,319.67 | 6/1/2025 | Ativa | Revitalização Necessária: SUBSTITUIÇÃO DO TPC 84V1 FASES (A, B e C). Incluído no recurso em face da REH 2.098/2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | EL 230 kV B. ESPERANCA LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI | RB | FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI | 061/2001 | IPCA | RMEL | REN 443/2011 | 2/21/2016 | 2/20/2044 | R$21,835.89 | 6/1/2025 | Ativa | Substituição do sistema de proteção da LT Boa Esperança-Boa Esperança I 04V1 na SE Boa Esperança, por proteção digital (retrofit) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | EL 230 kV B. ESPERANCA LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI | RB | FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/8/2019 | 5/1/2048 | R$273,948.72 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-2 PI | RB | FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-2 PI | RB | FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/7/2014 | 12/15/2045 | R$35,535.15 | 6/1/2025 | Ativa | Revitalização Necessária: SUBSTITUIÇÃO DOS TC 94L2 FASES ( C e B). Incluído no recurso em face a REH 2.098/2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-2 PI | RB | FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI | 061/2001 | IPCA | RBNI | REA 5861/2016 | 6/10/2016 | 12/16/2035 | R$2,898.59 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE SISTEMAS DE PROTEÇÃO E PAINÉIS ASSOCIADOS EM 03 TERMINAIS DE LINHAS DE TRANSMISSÃO (LTs 04L1 04L2 e 04V1). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-2 PI | RB | FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/30/2021 | 11/14/2045 | R$304,347.24 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-1 PI | RB | FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B. ESPERANCA | EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-1 PI | RB | FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI | 061/2001 | IPCA | RMEL | REN 643/2014 | 5/25/2014 | 5/24/2042 | R$34,430.83 | 6/1/2025 | Ativa | Substituição do sistema de proteção da LT Teresina-Boa Esperança 04L1 na SE Boa Esperança, por proteção digital (retrofit) Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-1 PI | RB | FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/8/2014 | 1/26/2046 | R$16,510.10 | 6/1/2025 | Ativa | Revitalização Necessária: SUBSTITUIÇÃO DO TPC HAEFELY-ER 84L1 FASE C. Incluído no recurso em face da REH 2.098/2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-1 PI | RB | FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/9/2021 | 12/17/2046 | R$392,073.83 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B. ESPERANCA | EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-1 PI | RB | FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI | 061/2001 | IPCA | RBNI | REA 5861/2016 | 12/30/2015 | 7/6/2035 | R$2,833.84 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE SISTEMAS DE PROTEÇÃO E PAINÉIS ASSOCIADOS EM 03 TERMINAIS DE LINHAS DE TRANSMISSÃO (LTs 04L1 04L2 e 04V1). Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | B. FLUMINENSE | RTB 500 kV 66,66 Mvar B. FLUMINENSE RTR1 RJ | RB | FT RTB 500 kV 66,66 Mvar B. FLUMINENSE RTR1 RJ | 062/2001 | IPCA | RBNIA | REA 15073/2024 | R$843,781.90 | 6/1/2025 | Prevista | T2023-168-A | Instalação de uma fase reserva para o 1º banco de reatores de barra 500 kV - 66,66 Mvar, na SE Baixada Fluminense | ||||
| AXIA Energia | B. FLUMINENSE | RTB 500 kV 200 Mvar B. FLUMINENSE RT1 RJ | RB | FT RTB 500 kV 200 Mvar B. FLUMINENSE RT1 RJ | 062/2001 | IPCA | RBNIA | REA 15073/2024 | R$ 2,531,345.70 | 6/1/2025 | Prevista | T2023-168 | Instalação do 1º banco de reatores de barra 500 kV - 3x66,66 Mvar, na SE Baixada Fluminense. | ||||
| AXIA Energia | B. FLUMINENSE | MG 500 kV B. FLUMINENSE MG1 RJ | RB | FT MG 500 kV B. FLUMINENSE MG1 RJ | 062/2001 | IPCA | RBNIA | REA 15073/2024 | R$694,457.31 | 6/1/2025 | Prevista | T2023-168 | Módulo de infraestrutura associado à instalação do 1º banco de reatores de barra 500 kV - 3x66,66 Mvar, em 500 kV e arranjo DJM, na SE Baixada Fluminense. | ||||
| AXIA Energia | B. FLUMINENSE | MC 500 kV RTB 500 kV 200 Mvar B. FLUMINENSE RT1 RJ | RB | FT RTB 500 kV 200 Mvar B. FLUMINENSE RT1 RJ | 062/2001 | IPCA | RBNIA | REA 15073/2024 | R$ 2,091,813.84 | 6/1/2025 | Prevista | T2023-168 | Instalação da conexão para o 1º banco de reatores de barra 500 kV - 3x66,66 Mvar, em 500 kV e arranjo DJM, na SE Baixada Fluminense. | ||||
| AXIA Energia | B. FLUMINENSE | IB 500 kV MG 500 kV B. FLUMINENSE MG1 RJ IB2 | RB | FT MG 500 kV B. FLUMINENSE MG1 RJ | 062/2001 | IPCA | RBNIA | REA 15073/2024 | R$ 2,384,892.51 | 6/1/2025 | Prevista | T2023-168 | Instalação da interligação de barras para o 1º banco de reatores de barra 500 kV - 3x66,66 Mvar, na SE Baixada Fluminense. | ||||
| AXIA Energia | B.DESPACHO 3 | RTL 500 kV 33,33 Mvar B.DESPACHO 3 RTR3 MG | RB | FT RTL 500 kV 33,33 Mvar B.DESPACHO 3 RTR3 MG | 003/2009 | IPCA | RBL | CC 003/2009 | 1/28/2009 | 1/28/2039 | R$251,142.96 | 6/1/2025 | Ativa | T2009-194 | Contrato de Concessão nº 003/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia | B.DESPACHO 3 | RTL 500 kV 100 Mvar B.DESPACHO 3 RT21 MG | RB | FT RTL 500 kV 100 Mvar B.DESPACHO 3 RT21 MG | 003/2009 | IPCA | RBL | CC 003/2009 | 1/28/2009 | 1/28/2039 | R$753,430.91 | 6/1/2025 | Ativa | T2009-194 | Contrato de Concessão nº 003/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia | B.DESPACHO 3 | MC 500 kV RTL 500 kV 100 Mvar B.DESPACHO 3 RT21 MG | RB | FT RTL 500 kV 100 Mvar B.DESPACHO 3 RT21 MG | 003/2009 | IPCA | RBL | CC 003/2009 | 1/28/2009 | 1/28/2039 | R$580,959.90 | 6/1/2025 | Ativa | T2009-194 | Contrato de Concessão nº 003/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia | B.DESPACHO 3 | EL 500 kV B.DESPACHO 3 LT 500 kV B.DESPACHO 3 /OURO PRETO 2 C-1 MG | RB | FT LT 500 kV B.DESPACHO 3 /OURO PRETO 2 C-1 MG | 003/2009 | IPCA | RBL | CC 003/2009 | 1/28/2009 | 1/28/2039 | R$693,450.89 | 6/1/2025 | Ativa | T2009-194 | Contrato de Concessão nº 003/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Nordeste | B.J.LAPA II | EL 230 kV B.J.LAPA II LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA | RB | FT LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA | 020/2010 | IPCA | RBL | CC 020/2010 | 6/2/2014 | 11/23/2040 | R$329,366.10 | 6/1/2025 | Ativa | T2010-091 | Contrato de Concessão nº 020/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | B.JESUS LAPA | TT 69/13,8 kV B.JESUS LAPA TA1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | TT 69/13,8 kV B.JESUS LAPA TA1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$248,222.69 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | TT 69/0 kV B.JESUS LAPA TA2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | TR 69/69 kV B.JESUS LAPA TREG4 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR4 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$166,073.82 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | TR 69/69 kV B.JESUS LAPA TREG2 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$166,073.82 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | TR 230/69 kV B.JESUS LAPA TR4 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR4 BA | 061/2001 | IPCA | RBNI | REA 6168/2017 | 12/16/2019 | 12/28/2053 | R$ 1,682,555.98 | 6/1/2025 | Ativa | T2016-065 | Obra de Substituição Completa - Instalação de Transformador trifásico 230/69 kV, 100 MVA, na Subestação Bom Jesus da Lapa, em substituição ao transformador de 33 MVA existente. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | B.JESUS LAPA | TR 230/69 kV B.JESUS LAPA TR4 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR4 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/23/2021 | 12/22/2049 | R$40,336.46 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | TR 230/69 kV B.JESUS LAPA TR3 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$209,167.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | TR 230/69 kV B.JESUS LAPA TR3 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR3 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$586,958.33 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | TR 230/69 kV B.JESUS LAPA TR3 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR3 BA | 061/2001 | IPCA | RBNIA | DSP 2289/2023 | R$ 2,396,069.65 | 6/1/2025 | Prevista | T2023-110 | Obra de Substituição Completa - Substituição do transformador 230/69 kV de 39 MVA (04T3) por um transformador de 100 MVA na SE Bom Jesus da Lapa. (Rotina-Substituição - o IdeMdl 6998 será substituído pelo novo equipamento). | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | TR 230/69 kV B.JESUS LAPA TR2 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,774.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | TR 230/69 kV B.JESUS LAPA TR2 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR2 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/27/2017 | 5/4/2052 | R$10,545.05 | 6/1/2025 | Ativa | Substituição de BUCHAS, SE BJS 04T2 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | TR 230/69 kV B.JESUS LAPA TR2 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR2 BA | 061/2001 | IPCA | RBNIA | DSP 4277/2023 | R$ 2,190,331.65 | 6/1/2025 | Prevista | T2023-159 | Obra de Substituição Completa - AUTORIZAÇÃO DE REFORÇO PARA SE 230/69 KV BOM JESUS DA LAPA- 2º TR 230/69/13,8 KV, 100 MVA, EM SUBSTITUIÇÃO AO TR230/69/13,8 KV – 33 MVA (04T2) EXISTENTE E AO REGULADOR SÉRIE ASSOCIADO (04T2/02R2)(Rotina-Substituição - IdeMdl 6995). | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | TR 230/69 kV B.JESUS LAPA TR1 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$247,202.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | TR 230/13,8 kV B.JESUS LAPA TR6 BA | RB | FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$319,152.16 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | TR 230/13,8 kV B.JESUS LAPA TR6 BA | RB | FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$895,594.89 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | TR 230/13,8 kV B.JESUS LAPA TR6 BA | RB | FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$825,629.06 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | RTS 69 kV 40 Mvar B.JESUS LAPA RT2 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$180,158.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | RTL 230 kV 5 Mvar B.JESUS LAPA RTR1 BA | RB | FT RTL 230 kV 5 Mvar B.JESUS LAPA RTR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$78,941.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | RTL 230 kV 5 Mvar B.JESUS LAPA RTR1 BA | RB | FT RTL 230 kV 5 Mvar B.JESUS LAPA RTR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$221,524.23 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA | RB | FT RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$236,825.61 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA | RB | FT RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$664,572.68 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA | RB | FT RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$236,825.61 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA | RB | FT RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$664,572.68 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA | RB | FT RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$192,025.69 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA | RB | FT RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 9/13/2017 | 8/23/2053 | R$25,715.81 | 6/1/2025 | Ativa | Substituição de BUCHAS, SE BJS 04E3 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | RTB 13,8 kV 5 Mvar B.JESUS LAPA RT2 BA | RBF | FT RTB 13,8 kV 5 MVAr B.JESUS LAPA RT2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | RTB 13,8 kV 5 Mvar B.JESUS LAPA RT2 BA | RBF | FT RTB 13,8 kV 5 MVAr B.JESUS LAPA RT2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$351,841.75 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | RTB 13,8 kV 5 Mvar B.JESUS LAPA RT1 BA | RBF | FT RTB 13,8 kV 5 MVAr B.JESUS LAPA RT1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | RTB 13,8 kV 5 Mvar B.JESUS LAPA RT1 BA | RBF | FT RTB 13,8 kV 5 MVAr B.JESUS LAPA RT1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$351,841.75 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MG 230 kV B.JESUS LAPA MG1 BA | RB | FT MG 230 kV B.JESUS LAPA MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$580,192.19 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MG 230 kV B.JESUS LAPA MG1 BA | RB | FT MG 230 kV B.JESUS LAPA MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 1/23/2014 | 1/22/2031 | R$2,299.27 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCO DE BATERIAS 900A2 DE 250 Vcc Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MG 230 kV B.JESUS LAPA MG1 BA | RB | FT MG 230 kV B.JESUS LAPA MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/28/2014 | 11/27/2031 | R$1,956.03 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCO DE BATERIAS 900A1 DE 250 Vcc Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MG 230 kV B.JESUS LAPA MG1 BA | RB | FT MG 230 kV B.JESUS LAPA MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/20/2013 | 12/19/2028 | R$335,980.65 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SISTEMA DE AMPLIFICAÇÃO ÓPTICO Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MG 230 kV B.JESUS LAPA MG1 BA | RB | FT MG 230 kV B.JESUS LAPA MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/24/2015 | 7/23/2030 | R$69,615.79 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SWITCH.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MG 230 kV B.JESUS LAPA MG1 BA | RB | FT MG 230 kV B.JESUS LAPA MG1 BA | 061/2001 | IPCA | RBNI | REA 6168/2017 | 5/12/2021 | 4/4/2050 | R$223,098.15 | 6/1/2025 | Ativa | T2016-065 | Complementação do Módulo de Infraestrutura Geral em 230 kV associados ao transformador trifásico 230/69 kV, 100 MVA, arranjo BPT, na Subestação Bom Jesus da Lapa. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | B.JESUS LAPA | MG 230 kV B.JESUS LAPA MG1 BA | RB | FT MG 230 kV B.JESUS LAPA MG1 BA | 061/2001 | IPCA | RBNI | REA 6168/2017 | 5/12/2021 | 5/28/2049 | R$64,451.42 | 6/1/2025 | Ativa | T2016-065 | Complementação do Módulo de Infraestrutura Geral em 69 kV associados ao transformador trifásico 230/69 kV, 100 MVA, arranjo BPT, na Subestação Bom Jesus da Lapa. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | B.JESUS LAPA | MG 230 kV B.JESUS LAPA MG1 BA | RB | FT MG 230 kV B.JESUS LAPA MG1 BA | 061/2001 | IPCA | RBNI | REA 6168/2017 | 5/12/2021 | 5/11/2061 | R$81,815.25 | 6/1/2025 | Ativa | T2016-065 | Adequação de parte do barramento do setor de 230 kV, correspondente à 3 vãos, da Subestação Bom Jesus da Lapa, para instalação transformador trifásico 230/69 kV, 100 MVA. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | B.JESUS LAPA | MG 230 kV B.JESUS LAPA MG1 BA | RB | FT MG 230 kV B.JESUS LAPA MG1 BA | 061/2001 | IPCA | RBNI | REA 6168/2017 | 5/12/2021 | 5/11/2061 | R$81,815.42 | 6/1/2025 | Ativa | T2016-065 | Adequação do barramento do setor de 69 kV, da Subestação Bom Jesus da Lapa, para instalação transformador trifásico 230/69 kV, 100 MVA. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | B.JESUS LAPA | MG 230 kV B.JESUS LAPA MG1 BA | RB | FT MG 230 kV B.JESUS LAPA MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,628,117.32 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MG 230 kV B.JESUS LAPA MG1 BA | RB | FT MG 230 kV B.JESUS LAPA MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,500,925.25 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MG 230 kV B.JESUS LAPA MG1 BA | RB | FT MG 230 kV B.JESUS LAPA MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/29/2021 | 2/2/2041 | R$346,351.43 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 69 kV TT 69/13,8 kV B.JESUS LAPA TA1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 69 kV TT 69/0 kV B.JESUS LAPA TA2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 69 kV TR 230/69 kV B.JESUS LAPA TR4 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR4 BA | 061/2001 | IPCA | RBNI | REA 6168/2017 | 12/16/2019 | 5/29/2048 | R$484,108.16 | 6/1/2025 | Ativa | T2016-065 | Instalação, na SE B.JESUS LAPA, de um módulo de conexão, em 69 kV, para o autotransformador TR 230/69 kV B.JESUS LAPA T5 BA *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 69 kV TR 230/69 kV B.JESUS LAPA TR3 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 69 kV TR 230/69 kV B.JESUS LAPA TR3 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/7/2020 | 1/9/2049 | R$40,182.96 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 69 kV TR 230/69 kV B.JESUS LAPA TR2 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 69 kV TR 230/69 kV B.JESUS LAPA TR2 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/25/2021 | 11/29/2049 | R$26,851.93 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 69 kV TR 230/69 kV B.JESUS LAPA TR1 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 69 kV TR 230/69 kV B.JESUS LAPA TR1 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 69 kV TR 230/69 kV B.JESUS LAPA TR1 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$162,185.50 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 230 kV TR 230/69 kV B.JESUS LAPA TR4 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR4 BA | 061/2001 | IPCA | RBNI | REA 6168/2017 | 12/16/2019 | 10/17/2049 | R$ 1,219,053.75 | 6/1/2025 | Ativa | T2016-065 | Instalação, na SE B.JESUS LAPA, de um módulo de conexão, em 230 kV, para o autotransformador TR 230/69 kV B.JESUS LAPA T5 BA *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 230 kV TR 230/69 kV B.JESUS LAPA TR3 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 230 kV TR 230/69 kV B.JESUS LAPA TR3 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR3 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$410,719.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 230 kV TR 230/69 kV B.JESUS LAPA TR3 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR3 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/21/2017 | 5/29/2048 | R$57,639.39 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC 230 kV - 94T3 A/B/C * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 230 kV TR 230/69 kV B.JESUS LAPA TR3 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/23/2020 | 6/11/2046 | R$35,492.25 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 230 kV TR 230/69 kV B.JESUS LAPA TR2 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 230 kV TR 230/69 kV B.JESUS LAPA TR2 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/22/2020 | 6/19/2046 | R$18,747.16 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 230 kV TR 230/69 kV B.JESUS LAPA TR1 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 230 kV TR 230/69 kV B.JESUS LAPA TR1 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$410,719.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 230 kV TR 230/69 kV B.JESUS LAPA TR1 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$378,633.35 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 230 kV TR 230/69 kV B.JESUS LAPA TR1 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/24/2019 | 3/26/2049 | R$60,889.32 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 230 kV TR 230/13,8 kV B.JESUS LAPA TR6 BA | RB | FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 230 kV TR 230/13,8 kV B.JESUS LAPA TR6 BA | RB | FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$410,719.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 230 kV TR 230/13,8 kV B.JESUS LAPA TR6 BA | RB | FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/19/2017 | 5/27/2048 | R$57,629.70 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC 230 kV - 94T6 A/B/C * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 230 kV TR 230/13,8 kV B.JESUS LAPA TR6 BA | RB | FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/22/2020 | 6/14/2046 | R$36,272.22 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 230 kV RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA | RB | FT RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$91,861.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 230 kV RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA | RB | FT RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$257,778.53 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 230 kV RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA | RB | FT RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$91,861.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 230 kV RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA | RB | FT RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$257,778.53 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 230 kV RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA | RB | FT RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$140,466.92 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 230 kV RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA | RB | FT RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$394,173.90 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 230 kV RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA | RB | FT RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 6/2/2017 | 6/10/2048 | R$19,232.50 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC 230 kV - 94E3-A * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 230 kV RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA | RB | FT RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/13/2020 | 5/4/2047 | R$46,076.79 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 230 kV CR 230 kV 34,9 Mvar B.JESUS LAPA BC1 BA | RB | FT CR 230 kV 34,9 MVAr B.JESUS LAPA BC1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$166,750.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 230 kV CR 230 kV 34,9 Mvar B.JESUS LAPA BC1 BA | RB | FT CR 230 kV 34,9 MVAr B.JESUS LAPA BC1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/27/2019 | 3/1/2049 | R$10,271.31 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 13,8 kV TR 230/69 kV B.JESUS LAPA TR2 BA | RBF | FT TR 230/69 kV B.JESUS LAPA TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 13,8 kV TR 230/13,8 kV B.JESUS LAPA TR6 BA | RB | FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 13,8 kV TR 13,8/0,22 kV B.JESUS LAPA TR5 BA | RB | FT MG 230 kV B.JESUS LAPA MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 13,8 kV RTB 13,8 kV 5 Mvar B.JESUS LAPA RT2 BA | RBF | FT RTB 13,8 kV 5 MVAr B.JESUS LAPA RT2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,598.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 13,8 kV RTB 13,8 kV 5 Mvar B.JESUS LAPA RT1 BA | RBF | FT RTB 13,8 kV 5 MVAr B.JESUS LAPA RT1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,598.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 13,8 kV CS 30/-15 Mvar B.JESUS LAPA CS1 BA | RB | FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$60,394.36 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 13,8 kV CS 30/-15 Mvar B.JESUS LAPA CS1 BA | RB | FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$169,476.78 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | MC 13,8 kV CS 30/-15 Mvar B.JESUS LAPA CS1 BA | RB | FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/28/2017 | 1/31/2047 | R$1,384.06 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | IB 69 kV MG 230 kV B.JESUS LAPA MG1 BA IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | IB 69 kV MG 230 kV B.JESUS LAPA MG1 BA IB1 | DIT | 061/2001 | IPCA | RCDM | REA 6168/2017 | 5/12/2021 | 5/11/2052 | R$45,247.52 | 6/1/2025 | Ativa | T2016-065 | Adequação da interligação de barra do setor de 69 kV, com a substituição de duas chaves seccionadoras, da Subestação Bom Jesus da Lapa. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | IB 69 kV MG 230 kV B.JESUS LAPA MG1 BA IB1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/15/2019 | 2/27/2050 | R$135,163.03 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | IB 230 kV MG 230 kV B.JESUS LAPA MG1 BA IB1 | RB | FT MG 230 kV B.JESUS LAPA MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,837.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | IB 230 kV MG 230 kV B.JESUS LAPA MG1 BA IB1 | RB | FT MG 230 kV B.JESUS LAPA MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$325,059.40 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | IB 230 kV MG 230 kV B.JESUS LAPA MG1 BA IB1 | RB | FT MG 230 kV B.JESUS LAPA MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$299,665.05 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | IB 230 kV MG 230 kV B.JESUS LAPA MG1 BA IB1 | RB | FT MG 230 kV B.JESUS LAPA MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/1/2019 | 2/3/2049 | R$10,555.57 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | EL 69 kV B.JESUS LAPA DIST8 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | EL 69 kV B.JESUS LAPA DIST8 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/21/2022 | 6/25/2051 | R$43,157.34 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | EL 69 kV B.JESUS LAPA DIST7 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | EL 69 kV B.JESUS LAPA DIST7 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/10/2022 | 4/9/2046 | R$8,078.41 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | EL 69 kV B.JESUS LAPA DIST6 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | EL 69 kV B.JESUS LAPA DIST6 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/16/2022 | 7/17/2051 | R$17,984.54 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | EL 69 kV B.JESUS LAPA DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | EL 69 kV B.JESUS LAPA DIST5 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/1/2019 | 10/3/2049 | R$32,050.62 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | EL 69 kV B.JESUS LAPA DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | EL 69 kV B.JESUS LAPA DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | EL 69 kV B.JESUS LAPA DIST3 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 8/30/2015 | 9/1/2045 | R$7,425.40 | 6/1/2025 | Ativa | Substituído TC IH72 com desgaste prematuro. Posição Operacional: 92M1-2-C/BJS. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | EL 69 kV B.JESUS LAPA DIST3 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 8/30/2015 | 9/1/2045 | R$7,425.40 | 6/1/2025 | Ativa | Substituído TC AOT 72,5. Posição Operacional: 92M1-2-A/BJS. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | EL 69 kV B.JESUS LAPA DIST3 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/16/2022 | 9/12/2054 | R$80,872.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | EL 69 kV B.JESUS LAPA DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | EL 69 kV B.JESUS LAPA DIST2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/3/2022 | 12/5/2053 | R$115,266.20 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | EL 69 kV B.JESUS LAPA DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | EL 69 kV B.JESUS LAPA DIST1 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 11/22/2015 | 11/24/2045 | R$7,482.62 | 6/1/2025 | Ativa | Substituído TC AOT 72,5 com vida regulatória esgotada. Posição Operacional: 92C1-2-C/BJS. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | EL 69 kV B.JESUS LAPA DIST1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/10/2022 | 12/13/2050 | R$42,513.58 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | B.JESUS LAPA | EL 230 kV B.JESUS LAPA LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA | RB | FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | EL 230 kV B.JESUS LAPA LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA | RB | FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 7/9/2017 | 7/17/2048 | R$38,584.45 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC 230 kV - 94F5 A/B * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | EL 230 kV B.JESUS LAPA LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA | RB | FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/10/2015 | 9/22/2037 | R$61,786.51 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | EL 230 kV B.JESUS LAPA LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA | RB | FT LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | EL 230 kV B.JESUS LAPA LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA | RB | FT LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$596,907.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | EL 230 kV B.JESUS LAPA LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA | RB | FT LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/6/2022 | 7/5/2050 | R$4,709.00 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | CS 30/-15 Mvar B.JESUS LAPA CS1 BA | RB | FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$820,513.52 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | CS 30/-15 Mvar B.JESUS LAPA CS1 BA | RB | FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,302,499.58 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | CS 30/-15 Mvar B.JESUS LAPA CS1 BA | RB | FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,122,623.29 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | B.JESUS LAPA | CS 30/-15 Mvar B.JESUS LAPA CS1 BA | RB | FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA | 061/2001 | IPCA | RBNI | REA 5861/2016 | 6/30/2013 | 2/28/2043 | R$71,970.08 | 6/1/2025 | Ativa | Modernização do compensador síncrono * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | CS 30/-15 Mvar B.JESUS LAPA CS1 BA | RB | FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/26/2016 | 6/29/2046 | R$ 1,261,550.80 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | B.JESUS LAPA | CR 230 kV 34,9 Mvar B.JESUS LAPA BC1 BA | RB | FT CR 230 kV 34,9 MVAr B.JESUS LAPA BC1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$187,125.69 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BACABEIRA | MG 500 kV BACABEIRA MG2 MA | RB | FT MG 500 kV BACABEIRA MG2 MA | 058/2001 | IPCA | RBNI | DSP 554/2023 | 9/9/2019 | 12/31/2042 | R$61,705.51 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 01 Módulo Geral de Acessante - MIG-A 500 kV na SE Bacabeira, transferido para a Eletronorte após o seccionamento dos circuitos 1 e 2 da Linha de Transmissão 500 kV Miranda II - São Luís II na Subestação. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | BACABEIRA | MG 500 kV BACABEIRA MG2 MA | RB | FT MG 500 kV BACABEIRA MG2 MA | 058/2001 | IPCA | RBNI | DSP 554/2023 | 9/26/2019 | 12/31/2042 | R$66,681.66 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 500 kV na SE Bacabeira, associado a Entrada de Linha 500 kV para a SE Miranda II, em função do seccionamento da LT 500 kV Miranda II - São Luís II C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | BACABEIRA | MG 500 kV BACABEIRA MG2 MA | RB | FT MG 500 kV BACABEIRA MG2 MA | 058/2001 | IPCA | RBNI | DSP 554/2023 | 9/26/2019 | 12/31/2042 | R$66,681.66 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 500 kV na SE Bacabeira, associado a Entrada de Linha 500 kV para a SE São Luís II, em função do seccionamento da LT 500 kV Miranda II - São Luís II C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | BACABEIRA | MG 500 kV BACABEIRA MG2 MA | RB | FT MG 500 kV BACABEIRA MG2 MA | 058/2001 | IPCA | RBNI | DSP 554/2023 | 9/9/2019 | 12/31/2042 | R$66,681.66 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 500 kV na SE Bacabeira, associado a Entrada de Linha 500 kV para a SE Miranda II, em função do seccionamento da LT 500 kV Miranda II - São Luís II C2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | BACABEIRA | MG 500 kV BACABEIRA MG2 MA | RB | FT MG 500 kV BACABEIRA MG2 MA | 058/2001 | IPCA | RBNI | DSP 554/2023 | 9/9/2019 | 12/31/2042 | R$66,681.66 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 500 kV na SE Bacabeira, associado a Entrada de Linha 500 kV para a SE São Luís II, em função do seccionamento da LT 500 kV Miranda II - São Luís II C2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | BACABEIRA | MG 500 kV BACABEIRA MG2 MA | RB | FT MG 500 kV BACABEIRA MG2 MA | 058/2001 | IPCA | RBNI | DSP 554/2023 | 7/1/2023 | 12/31/2042 | R$10,294.18 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Sistema Espacial de Proteção-SEPna SE Bacabeira. | |||
| AXIA Energia Norte | BACABEIRA | EL 500 kV BACABEIRA LT 500 kV SAO LUIS II /BACABEIRA C-2 MA | RB | FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA | 058/2001 | IPCA | RBNI | DSP 554/2023 | 9/9/2019 | 12/31/2042 | R$231,646.63 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV, arranjo Disjuntor e Meio, na Subestação Bacabeira, associada à Linha de Transmissão 500 kV Bacabeira – São Luís II C2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | BACABEIRA | EL 500 kV BACABEIRA LT 500 kV SAO LUIS II /BACABEIRA C-1 MA | RB | FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA | 058/2001 | IPCA | RBNI | DSP 554/2023 | 9/26/2019 | 12/31/2042 | R$231,646.63 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV, arranjo Disjuntor e Meio, na Subestação Bacabeira, associada à Linha de Transmissão 500 kV Bacabeira – São Luís II C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | BACABEIRA | EL 500 kV BACABEIRA LT 500 kV BACABEIRA /MIRANDA II C-2 MA | RB | FT LT 500 kV BACABEIRA /MIRANDA II C-2 MA | 058/2001 | IPCA | RBNI | DSP 554/2023 | 9/9/2019 | 12/31/2042 | R$231,646.63 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV, arranjo Disjuntor e Meio, na Subestação Bacabeira, associada à Linha de Transmissão 500 kV Miranda II – Bacabeira C2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | BACABEIRA | EL 500 kV BACABEIRA LT 500 kV BACABEIRA /MIRANDA II C-1 MA | RB | FT LT 500 kV BACABEIRA /MIRANDA II C-1 MA | 058/2001 | IPCA | RBNI | DSP 554/2023 | 9/26/2019 | 12/31/2042 | R$231,646.63 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV, arranjo Disjuntor e Meio, na Subestação Bacabeira, associada à Linha de Transmissão 500 kV Miranda II – Bacabeira C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | BALSAS | TT 69/0 kV BALSAS TT1 MA | DIT | 001/2009 | IPCA | RPEC | CC 001/2009 | 1/28/2009 | 1/28/2039 | R$126,852.31 | 6/1/2025 | Ativa | T2009-195 | Contrato de Concessão nº 001/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | BALSAS | TR 230/69 kV BALSAS TR2 MA | RBF | FT TR 230/69 kV BALSAS TR2 MA | 001/2009 | IPCA | RBNI | REA 4745/2014 | 6/23/2016 | 5/24/2049 | R$ 2,295,531.16 | 6/1/2025 | Ativa | T2014-031 | Instalação de um Transformador trifásico TR2 230/69/13,8 kV - 100 MVA. *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | ||
| AXIA Energia Norte | BALSAS | TR 230/69 kV BALSAS TR1 MA | RBF | FT TR 230/69 kV BALSAS TR1 MA | 001/2009 | IPCA | RBL | CC 001/2009 | 1/28/2009 | 1/28/2039 | R$427,374.20 | 6/1/2025 | Ativa | T2009-195 | Contrato de Concessão nº 001/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | BALSAS | MG 230 kV BALSAS MG1 MA | RB | FT MG 230 kV BALSAS MG1 MA | 001/2009 | IPCA | RBL | CC 001/2009 | 1/28/2009 | 1/28/2039 | R$ 1,086,660.02 | 6/1/2025 | Ativa | T2009-195 | Contrato de Concessão nº 001/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | BALSAS | MG 230 kV BALSAS MG1 MA | RB | FT MG 230 kV BALSAS MG1 MA | 001/2009 | IPCA | RBNI | REA 4745/2014 | 6/23/2016 | 10/25/2043 | R$172,663.42 | 6/1/2025 | Ativa | T2014-031 | Instalação de Módulo de Infraestrutura de Manobra - MIM em230 kV, associado ao módulo de conexão do segundo transformador trifásico TR2 230/69/13,8 kV - 100 MVA. *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | ||
| AXIA Energia Norte | BALSAS | MG 230 kV BALSAS MG1 MA | RB | FT MG 230 kV BALSAS MG1 MA | 001/2009 | IPCA | RBNI | REA 4745/2014 | 6/23/2016 | 10/25/2043 | R$49,489.93 | 6/1/2025 | Ativa | T2014-031 | Instalação de um módulo de infraestrutura de manobra - MIM em 69 kV, associado ao módulo de conexão do segundo transformador trifásico TR2 230/69/13,8 kV - 100 MVA. *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | ||
| AXIA Energia Norte | BALSAS | MG 230 kV BALSAS MG1 MA | RB | FT MG 230 kV BALSAS MG1 MA | 001/2009 | IPCA | RBNI | REN 443/2011 | 8/16/2017 | 6/11/2043 | R$20,526.11 | 6/1/2025 | Ativa | Instalação de um Módulo de Infraestrutura de Manobra para a entrada de linha 69 kV para a SE Balsas III * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Norte | BALSAS | MC 69 kV TT 69/0 kV BALSAS TT1 MA | DIT | 001/2009 | IPCA | RPEC | CC 001/2009 | 1/28/2009 | 1/28/2039 | R$31,713.63 | 6/1/2025 | Ativa | T2009-195 | Contrato de Concessão nº 001/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | BALSAS | MC 69 kV TR 230/69 kV BALSAS TR2 MA | RBF | FT TR 230/69 kV BALSAS TR2 MA | 001/2009 | IPCA | RBNI | REA 4745/2014 | 6/23/2016 | 2/28/2047 | R$484,425.23 | 6/1/2025 | Ativa | T2014-031 | Instalação de um módulo de conexão de transformador em 69 kV, arranjo BPT, associado ao transformador trifásico TR2 230/69/13,8 kV - 100 MVA. *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | ||
| AXIA Energia Norte | BALSAS | MC 69 kV TR 230/69 kV BALSAS TR1 MA | RBF | FT TR 230/69 kV BALSAS TR1 MA | 001/2009 | IPCA | RBL | CC 001/2009 | 1/28/2009 | 1/28/2039 | R$54,266.42 | 6/1/2025 | Ativa | T2009-195 | Contrato de Concessão nº 001/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | BALSAS | MC 69 kV TR 230/69 kV BALSAS TR1 MA | RBF | FT TR 230/69 kV BALSAS TR1 MA | 001/2009 | IPCA | RBNI | REA 4745/2014 | 7/15/2016 | 6/22/2047 | R$40,840.14 | 6/1/2025 | Ativa | T2014-031 | Adequação do módulo de conexão de transformador em 69 kV, arranjo BPT, associado ao transformador trifásico TR1 230/69/13,8 kV - 100 MVA. *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | ||
| AXIA Energia Norte | BALSAS | MC 230 kV TR 230/69 kV BALSAS TR2 MA | RBF | FT TR 230/69 kV BALSAS TR2 MA | 001/2009 | IPCA | RBNI | REA 4745/2014 | 6/23/2016 | 12/22/2046 | R$ 1,047,615.41 | 6/1/2025 | Ativa | T2014-031 | SE Balsas - Instalação de um módulo de conexão de transformador em 230 kV, arranjo BD4, associado ao transformador trifásico TR2 230/69/13,8 kV - 100 MVA. *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | ||
| AXIA Energia Norte | BALSAS | MC 230 kV TR 230/69 kV BALSAS TR1 MA | RBF | FT TR 230/69 kV BALSAS TR1 MA | 001/2009 | IPCA | RBL | CC 001/2009 | 1/28/2009 | 1/28/2039 | R$296,925.69 | 6/1/2025 | Ativa | T2009-195 | Contrato de Concessão nº 001/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | BALSAS | MC 13,8 kV TR 230/69 kV BALSAS TR2 MA | RBF | FT TR 230/69 kV BALSAS TR2 MA | 001/2009 | IPCA | RBNI | REA 4745/2014 | 6/23/2016 | 6/16/2031 | R$78,341.69 | 6/1/2025 | Ativa | T2014-031 | Instalação de um módulo de conexão de transformador em 13,8 kV, arranjo BS, associado ao transformador trifásico TR2 230/69/13,8 kV - 100 MVA. *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | ||
| AXIA Energia Norte | BALSAS | IB 69 kV MG 230 kV BALSAS MG1 MA IB1 | DIT | 001/2009 | IPCA | RPEC | CC 001/2009 | 1/28/2009 | 1/28/2039 | R$26,195.63 | 6/1/2025 | Ativa | T2009-195 | Contrato de Concessão nº 001/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | BALSAS | IB 230 kV MG 230 kV BALSAS MG1 MA IB1 | RB | FT MG 230 kV BALSAS MG1 MA | 001/2009 | IPCA | RBL | CC 001/2009 | 1/28/2009 | 1/28/2039 | R$164,183.71 | 6/1/2025 | Ativa | T2009-195 | Contrato de Concessão nº 001/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | BALSAS | EL 69 kV BALSAS SE BALSAS III | DIT | 001/2009 | IPCA | RCDM | REN 443/2011 | 8/16/2017 | 10/1/2048 | R$564,461.64 | 6/1/2025 | Ativa | Instalação de 1 (uma) entrada de linha 69 kV, arranjo BPT, para a SE Balsas III * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 27/06/2024) | ||||
| AXIA Energia Norte | BALSAS | EL 69 kV BALSAS DIST4 | DIT | 001/2009 | IPCA | RPEC | CC 001/2009 | 1/28/2009 | 1/28/2039 | R$55,065.45 | 6/1/2025 | Ativa | T2009-195 | Contrato de Concessão nº 001/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | BALSAS | EL 69 kV BALSAS DIST3 | DIT | 001/2009 | IPCA | RPEC | CC 001/2009 | 1/28/2009 | 1/28/2039 | R$55,065.45 | 6/1/2025 | Ativa | T2009-195 | Contrato de Concessão nº 001/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | BALSAS | EL 69 kV BALSAS DIST2 | DIT | 001/2009 | IPCA | RPEC | CC 001/2009 | 1/28/2009 | 1/28/2039 | R$55,065.45 | 6/1/2025 | Ativa | T2009-195 | Contrato de Concessão nº 001/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | BALSAS | EL 69 kV BALSAS DIST1 | DIT | 001/2009 | IPCA | RPEC | CC 001/2009 | 1/28/2009 | 1/28/2039 | R$55,065.45 | 6/1/2025 | Ativa | T2009-195 | Contrato de Concessão nº 001/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | BALSAS | EL 230 kV BALSAS LT 230 kV RIB.GONCALVES /BALSAS C-1 PI/MA | RB | FT LT 230 kV RIB.GONCALVES /BALSAS C-1 PI/MA | 001/2009 | IPCA | RBL | CC 001/2009 | 1/28/2009 | 1/28/2039 | R$342,161.28 | 6/1/2025 | Ativa | T2009-195 | Contrato de Concessão nº 001/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Nordeste | BANABUIU | TT 69/13,8 kV BANABUIU TA1 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BANABUIU | TT 69/0 kV BANABUIU TT2 CE | DIT | 061/2001 | IPCA | RCDM | REA 5809/2016 | 7/6/2020 | 8/11/2050 | R$273,687.37 | 6/1/2025 | Ativa | T2016-025 | INSTALAÇÃO DO SEGUNDO TRANSFORMADOR DE ATERRAMENTO, 69 kV, 7,5 MVA, NA SE BANABUIÚ, MOTIVADO PELA INSTALAÇÃO DO SEGUNDO TRANSFORMADOR 230/69 kV, 100 MVA, EM SUBSTITUIÇÃO AO TRANSFORMADOR 230/69 kV, 33 MVA, EXISTENTE. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BANABUIU | TR 69/13,8 kV BANABUIU TR7 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BANABUIU | TR 69/13,8 kV BANABUIU TR7 CE | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/23/2017 | 8/31/2052 | R$19,465.04 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BANABUIU | TR 69/13,8 kV BANABUIU TR4 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BANABUIU | TR 230/69 kV BANABUIU TR4 CE | RBF | FT TR 230/69 kV BANABUIU TR4 CE | 061/2001 | IPCA | RBNI | REA 2823/2011 | 9/23/2019 | 1/11/2054 | R$ 2,098,348.61 | 6/1/2025 | Ativa | T2010-048 | Instalar, na SE Banabuiú, um transformador trifásico 230/69 kV, de 100 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BANABUIU | TR 230/69 kV BANABUIU TR3 CE | RBF | FT TR 230/69 kV BANABUIU TR3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$247,202.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | TR 230/69 kV BANABUIU TR2 CE | RBF | FT TR 230/69 kV BANABUIU TR2 CE | 061/2001 | IPCA | RBNI | REA 5809/2016 | 6/13/2020 | 9/15/2054 | R$ 2,280,923.02 | 6/1/2025 | Ativa | T2016-025 | Obra de Substituição Completa - INSTALAÇÃO DO SEGUNDO TRANSFORMADOR 230/69 kV, 100 MVA, NA SE BANABUIÚ, EM SUBSTITUIÇÃO AO TRANSFORMADOR 230/69 kV, 33 MVA, EXISTENTE. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BANABUIU | TR 230/69 kV BANABUIU TR1 CE | RBF | FT TR 230/69 kV BANABUIU TR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$183,593.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | RTS 69 kV 40 Mvar BANABUIU RT2 CE | RBF | FT TR 230/69 kV BANABUIU TR2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$180,158.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | RTS 69 kV 40 Mvar BANABUIU RT2 CE | RBF | FT TR 230/69 kV BANABUIU TR2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$505,555.83 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | RTS 69 kV 40 Mvar BANABUIU RT2 CE | RBF | FT TR 230/69 kV BANABUIU TR2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$466,060.70 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | RTS 69 kV 40 Mvar BANABUIU RT1 CE | RBF | FT TR 230/69 kV BANABUIU TR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$180,158.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | RTS 13,8 kV 18,75 Mvar BANABUIU RT1 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$160,199.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BANABUIU | RTL 230 kV 10 Mvar BANABUIU RT3 CE | RB | FT LT 230 kV BANABUIU /ICO C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$163,799.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | RTL 230 kV 10 Mvar BANABUIU RT3 CE | RB | FT LT 230 kV BANABUIU /ICO C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$459,650.17 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | RTL 230 kV 10 Mvar BANABUIU RT2 CE | RB | FT LT 230 kV MILAGRES /BANABUIU C-2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$163,799.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | RTL 230 kV 10 Mvar BANABUIU RT2 CE | RB | FT LT 230 kV MILAGRES /BANABUIU C-2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$459,650.17 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | RTL 230 kV 10 Mvar BANABUIU RT1 CE | RB | FT LT 230 kV MILAGRES /BANABUIU C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$163,799.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | RTB 230 kV 3,33 Mvar BANABUIU RTR1 CE | RB | FT RTB 230 kV 3,33 MVAr BANABUIU RTR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$54,539.90 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | RTB 230 kV 20 Mvar BANABUIU RT4 CE | RB | FT RTB 230 kV 20 MVAr BANABUIU RT4 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$216,371.11 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | MG 230 kV BANABUIU MG1 CE | RB | FT MG 230 kV BANABUIU MG1 CE | 061/2001 | IPCA | RBNI | REA 2823/2011 | 9/23/2019 | 6/3/2048 | R$277,779.84 | 6/1/2025 | Ativa | T2010-048 | Complemento, na SE Banabuiú, de infraestrutura de módulo geral pela instalação do módulo de conexão 69 kV para o transformador trifásico 230/69 kV, de 100 MVA e pela realocação de um módulo de entrada de linha 230 kV. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BANABUIU | MG 230 kV BANABUIU MG1 CE | RB | FT MG 230 kV BANABUIU MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$709,034.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | MG 230 kV BANABUIU MG1 CE | RB | FT MG 230 kV BANABUIU MG1 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/19/2013 | 9/18/2030 | R$23,425.80 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCOS DE BATERIAS 900A1 E 900A2 DE 250 Vcc. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BANABUIU | MG 230 kV BANABUIU MG1 CE | RB | FT MG 230 kV BANABUIU MG1 CE | 061/2001 | IPCA | RBNI | REA 5809/2016 | 7/5/2020 | 7/21/2048 | R$58,586.34 | 6/1/2025 | Ativa | T2016-025 | MÓDULO DE INFRAESTRUTURA DE MANOBRA, 69 kV, BPT, NA SE BANABUIÚ, PARA INSTALAÇÃO DO SEGUNDO TRANSFORMADOR 230/69 kV, 100 MVA, EM SUBSTITUIÇÃO AO TRANSFORMADOR 230/69 kV, 33 MVA, EXISTENTE. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BANABUIU | MG 230 kV BANABUIU MG1 CE | RB | FT MG 230 kV BANABUIU MG1 CE | 061/2001 | IPCA | RMEL | REN 443/2011 | 9/30/2016 | 9/29/2033 | R$8,123.62 | 6/1/2025 | Ativa | Implantação de Banco de Baterias * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BANABUIU | MG 230 kV BANABUIU MG1 CE | RB | FT MG 230 kV BANABUIU MG1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/25/2021 | 1/1/2038 | R$470,730.51 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BANABUIU | MC 69 kV TT 69/13,8 kV BANABUIU TA1 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BANABUIU | MC 69 kV TT 69/0 kV BANABUIU TT2 CE | DIT | 061/2001 | IPCA | RCDM | REA 5809/2016 | 7/6/2020 | 7/12/2050 | R$359,432.44 | 6/1/2025 | Ativa | T2016-025 | CONEXÃO DO TRANSFORMADOR DE ATERRAMENTO, TT2, 69 kV, BPT, 7,5 MVA, NA SE BANABUIÚ, MOTIVADO PELA INSTALAÇÃO DO SEGUNDO TRANSFORMADOR 230/69 kV, 100 MVA, EM SUBSTITUIÇÃO AO TRANSFORMADOR 230/69 kV, 33 MVA, EXISTENTE. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BANABUIU | MC 69 kV TR 69/13,8 kV BANABUIU TR7 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BANABUIU | MC 69 kV TR 69/13,8 kV BANABUIU TR7 CE | DIT | 061/2001 | IPCA | RCDM | REA 6845/2018 | 1/1/2021 | 12/31/2053 | R$65,989.04 | 6/1/2025 | Ativa | Substituição de 1 Disjuntor do vão 02T4 69/13,8 kV (12W1). Capacidade do novo equipamento: Corrente de curto-circuito de 31,5 kA, no mínimo. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BANABUIU | MC 69 kV TR 69/13,8 kV BANABUIU TR7 CE | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/20/2017 | 10/23/2047 | R$30,210.89 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BANABUIU | MC 69 kV TR 230/69 kV BANABUIU TR4 CE | RBF | FT TR 230/69 kV BANABUIU TR4 CE | 061/2001 | IPCA | RBNI | REA 2823/2011 | 9/23/2019 | 5/16/2048 | R$600,192.80 | 6/1/2025 | Ativa | T2010-048 | Instalar, na SE Banabuiú, um módulo de conexão 69 kV, arranjo barra principal e transferência, para o transformador trifásico 230/69 kV, de 100 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BANABUIU | MC 69 kV TR 230/69 kV BANABUIU TR3 CE | RBF | FT TR 230/69 kV BANABUIU TR3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | MC 69 kV TR 230/69 kV BANABUIU TR2 CE | RBF | FT TR 230/69 kV BANABUIU TR2 CE | 061/2001 | IPCA | RBNI | REA 5809/2016 | 6/13/2020 | 12/25/2048 | R$529,078.52 | 6/1/2025 | Ativa | T2016-025 | Obra de Substituição Completa - CONEXÃO EM 69 kV, BPT, DO SEGUNDO TRANSFORMADOR 230/69 kV, 100 MVA, EM SUBSTITUIÇÃO AO TRANSFORMADOR 230/69 kV, 33 MVA, EXISTENTE. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BANABUIU | MC 69 kV TR 230/69 kV BANABUIU TR1 CE | RBF | FT TR 230/69 kV BANABUIU TR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | MC 69 kV TR 230/69 kV BANABUIU TR1 CE | RBF | FT TR 230/69 kV BANABUIU TR1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/17/2021 | 3/21/2050 | R$41,627.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BANABUIU | MC 230 kV TR 230/69 kV BANABUIU TR4 CE | RBF | FT TR 230/69 kV BANABUIU TR4 CE | 061/2001 | IPCA | RBNI | REA 2823/2011 | 9/23/2019 | 6/26/2037 | R$92,256.83 | 6/1/2025 | Ativa | T2010-048 | Instalar, na SE Banabuiú, um módulo de conexão 230 kV, arranjo barra principal e transferência, para o transformador trifásico 230/69 kV, de 100 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BANABUIU | MC 230 kV TR 230/69 kV BANABUIU TR3 CE | RBF | FT TR 230/69 kV BANABUIU TR3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | MC 230 kV TR 230/69 kV BANABUIU TR2 CE | RBF | FT TR 230/69 kV BANABUIU TR2 CE | 061/2001 | IPCA | RBNI | REA 5809/2016 | 6/13/2020 | 8/25/2047 | R$ 1,205,329.11 | 6/1/2025 | Ativa | T2016-025 | Obra de Substituição Completa - CONEXÃO EM 230 kV, BPT, DO SEGUNDO TRANSFORMADOR 230/69 kV, 100 MVA, NA SE BANABUIÚ, EM SUBSTITUIÇÃO AO TRANSFORMADOR 230/69 kV, 33 MVA, EXISTENTE. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BANABUIU | MC 230 kV TR 230/69 kV BANABUIU TR2 CE | RBF | FT TR 230/69 kV BANABUIU TR2 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/15/2021 | 9/14/2049 | R$5,612.74 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BANABUIU | MC 230 kV TR 230/69 kV BANABUIU TR1 CE | RBF | FT TR 230/69 kV BANABUIU TR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | MC 230 kV TR 230/69 kV BANABUIU TR1 CE | RBF | FT TR 230/69 kV BANABUIU TR1 CE | 061/2001 | IPCA | RBNI | REA 5484/2015 | 9/23/2021 | 9/22/2054 | R$164,137.39 | 6/1/2025 | Ativa | Substituição de disjuntor do vão: - TRAFO 04T1 (14T1) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BANABUIU | MC 230 kV TR 230/69 kV BANABUIU TR1 CE | RBF | FT TR 230/69 kV BANABUIU TR1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/17/2021 | 7/16/2045 | R$25,358.96 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BANABUIU | MC 230 kV RTL 230 kV 10 Mvar BANABUIU RT3 CE | RB | FT LT 230 kV BANABUIU /ICO C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$91,861.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | MC 230 kV RTL 230 kV 10 Mvar BANABUIU RT3 CE | RB | FT LT 230 kV BANABUIU /ICO C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/25/2022 | 9/24/2037 | R$5,900.09 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BANABUIU | MC 230 kV RTL 230 kV 10 Mvar BANABUIU RT2 CE | RB | FT LT 230 kV MILAGRES /BANABUIU C-2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$91,861.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | MC 230 kV RTL 230 kV 10 Mvar BANABUIU RT1 CE | RB | FT LT 230 kV MILAGRES /BANABUIU C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$91,861.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | MC 230 kV RTL 230 kV 10 Mvar BANABUIU RT1 CE | RB | FT LT 230 kV MILAGRES /BANABUIU C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/25/2022 | 9/24/2037 | R$5,856.36 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BANABUIU | MC 230 kV RTB 230 kV 20 Mvar BANABUIU RT4 CE | RB | FT RTB 230 kV 20 MVAr BANABUIU RT4 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$140,466.92 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | MC 230 kV RTB 230 kV 20 Mvar BANABUIU RT4 CE | RB | FT RTB 230 kV 20 MVAr BANABUIU RT4 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/11/2022 | 5/6/2053 | R$279,332.42 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BANABUIU | MC 230 kV BC 230 kV 50,5 Mvar BANABUIU BC2 CE | RB | FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$166,750.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | MC 230 kV BC 230 kV 50,5 Mvar BANABUIU BC2 CE | RB | FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$467,928.80 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | MC 230 kV BC 230 kV 50,5 Mvar BANABUIU BC2 CE | RB | FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$431,373.18 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | MC 230 kV BC 230 kV 50,5 Mvar BANABUIU BC2 CE | RB | FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/16/2017 | 6/1/2050 | R$107,315.39 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE DISJUNTOR, POSIÇÃO 14H2 DA SE BANABUIÚ * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BANABUIU | MC 230 kV BC 230 kV 50,5 Mvar BANABUIU BC1 CE | RB | FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$166,750.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | MC 230 kV BC 230 kV 50,5 Mvar BANABUIU BC1 CE | RB | FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$467,928.80 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | MC 230 kV BC 230 kV 50,5 Mvar BANABUIU BC1 CE | RB | FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$431,373.18 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | MC 230 kV BC 230 kV 50,5 Mvar BANABUIU BC1 CE | RB | FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE | 061/2001 | IPCA | RMEL | REN 443/2011 | 7/14/2017 | 7/30/2050 | R$107,816.13 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE DISJUNTOR, POSIÇÃO 14H1 DA SE BANABUIÚ * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BANABUIU | MC 13,8 kV TR 69/13,8 kV BANABUIU TR7 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BANABUIU | MC 13,8 kV TR 69/13,8 kV BANABUIU TR7 CE | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 12/8/2017 | 1/29/2051 | R$23,300.49 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE DISJUNTOR, POSIÇÃO 11W1 DA SE BANABUIU. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BANABUIU | IB 69 kV MG 230 kV BANABUIU MG1 CE IB1 | DIT | 061/2001 | IPCA | RCDM | REA 5809/2016 | 7/6/2020 | 3/26/2052 | R$405,208.41 | 6/1/2025 | Ativa | T2016-025 | Obra de Substituição Completa - SUBSTITUIÇÃO DA INTERLIGAÇÃO DE BARRAMENTO DE 69 kV, BPT, MOTIVADO PELA INSTALAÇÃO DO SEGUNDO TRANSFORMADOR 230/69 kV, 100 MVA, NA SE BANABUIÚ, EM SUBSTITUIÇÃO AO TRANSFORMADOR 230/69 kV, 33 MVA, EXISTENTE. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BANABUIU | IB 230 kV MG 230 kV BANABUIU MG1 CE IB1 | RB | FT MG 230 kV BANABUIU MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,837.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | IB 230 kV MG 230 kV BANABUIU MG1 CE IB1 | RB | FT MG 230 kV BANABUIU MG1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$325,059.40 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | EL 69 kV BANABUIU DIST6 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BANABUIU | EL 69 kV BANABUIU DIST6 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BANABUIU | EL 69 kV BANABUIU DIST6 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BANABUIU | EL 69 kV BANABUIU DIST6 | DIT | 061/2001 | IPCA | RCDM | REA 5484/2015 | 8/16/2020 | 8/19/2050 | R$32,878.62 | 6/1/2025 | Ativa | Substituição de 3 transformador(es) de corrente do(s) vão(s): EL SENADOR POMPEU (92J1) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BANABUIU | EL 69 kV BANABUIU DIST6 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/5/2022 | 7/21/2043 | R$7,068.36 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BANABUIU | EL 69 kV BANABUIU DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BANABUIU | EL 69 kV BANABUIU DIST5 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/9/2019 | 12/12/2045 | R$6,321.58 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BANABUIU | EL 69 kV BANABUIU DIST5 | DIT | 061/2001 | IPCA | RCDM | REA 6845/2018 | 2/17/2022 | 2/16/2055 | R$71,277.36 | 6/1/2025 | Ativa | Substituição de 1 Disjuntor do vão LT Senador Pompeu C2 (Solonópoles) (12J2) . Capacidade do novo equipamento: Corrente de curto-circuito de 31,5 kA, no mínimo Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BANABUIU | EL 69 kV BANABUIU DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BANABUIU | EL 69 kV BANABUIU DIST4 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/5/2022 | 4/4/2046 | R$8,074.76 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BANABUIU | EL 69 kV BANABUIU DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BANABUIU | EL 69 kV BANABUIU DIST3 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/12/2021 | 12/15/2051 | R$14,282.54 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BANABUIU | EL 69 kV BANABUIU DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BANABUIU | EL 69 kV BANABUIU DIST2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/24/2022 | 4/23/2046 | R$8,088.62 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BANABUIU | EL 69 kV BANABUIU DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BANABUIU | EL 230 kV BANABUIU LT 230 kV RUSSAS II /BANABUIU C-1 CE | RB | FT LT 230 kV RUSSAS II /BANABUIU C-1 CE | 018/2012 | IPCA | RBL | CC 018/2012 | 12/15/2020 | 6/1/2042 | R$611,676.76 | 6/1/2025 | Ativa | T2012-114-C | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | BANABUIU | EL 230 kV BANABUIU LT 230 kV MILAGRES /BANABUIU C-2 CE | RB | FT LT 230 kV MILAGRES /BANABUIU C-2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | EL 230 kV BANABUIU LT 230 kV MILAGRES /BANABUIU C-2 CE | RB | FT LT 230 kV MILAGRES /BANABUIU C-2 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/26/2013 | 11/25/2041 | R$33,790.72 | 6/1/2025 | Ativa | Substituição do sistema de proteção da LT Banabuiu-Milagres 04M3 na SE Banabuiu, por proteção digital (retrofit) .Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BANABUIU | EL 230 kV BANABUIU LT 230 kV MILAGRES /BANABUIU C-2 CE | RB | FT LT 230 kV MILAGRES /BANABUIU C-2 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/18/2018 | 3/28/2042 | R$386,337.34 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BANABUIU | EL 230 kV BANABUIU LT 230 kV MILAGRES /BANABUIU C-1 CE | RB | FT LT 230 kV MILAGRES /BANABUIU C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | EL 230 kV BANABUIU LT 230 kV MILAGRES /BANABUIU C-1 CE | RB | FT LT 230 kV MILAGRES /BANABUIU C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/25/2021 | 4/16/2047 | R$323,207.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BANABUIU | EL 230 kV BANABUIU LT 230 kV BANABUIU /RUSSAS II C-1 CE | RB | FT LT 230 kV BANABUIU /RUSSAS II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | EL 230 kV BANABUIU LT 230 kV BANABUIU /RUSSAS II C-1 CE | RB | FT LT 230 kV BANABUIU /RUSSAS II C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/12/2021 | 2/15/2050 | R$311,236.81 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BANABUIU | EL 230 kV BANABUIU LT 230 kV BANABUIU /MOSSORO II C-2 CE/RN | RB | FT LT 230 kV BANABUIU /MOSSORO II C-2 CE/RN | 061/2001 | IPCA | RBNI | REA 2173/2009 | 6/6/2016 | 7/13/2048 | R$ 1,062,812.11 | 6/1/2025 | Ativa | T2009-154 | Instalar um módulo de entrada de linha 230 kV na SE Banabuiu para o segundo circuito da LT 230kV Banabuiu / Mossoró II *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| Nova Era Ceará | BANABUIU | EL 230 kV BANABUIU LT 230 kV BANABUIU /MORADA NOVA C-1 CE | RB | FT LT 230 kV BANABUIU /MORADA NOVA C-1 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 1,584,571.51 | 6/1/2025 | Prevista | T2024-195-E | - LT 230 kV Banabuiú - Morada Nova, C1, CS; | ||||
| AXIA Energia Nordeste | BANABUIU | EL 230 kV BANABUIU LT 230 kV BANABUIU /ICO C-1 CE | RB | FT LT 230 kV BANABUIU /ICO C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | EL 230 kV BANABUIU LT 230 kV BANABUIU /ICO C-1 CE | RB | FT LT 230 kV BANABUIU /ICO C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/8/2022 | 9/10/2054 | R$179,403.69 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BANABUIU | EL 230 kV BANABUIU LT 230 kV BANABUIU /AQUIRAZ II C-3 CE | RB | FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE | 061/2001 | IPCA | RBNI | REA 2823/2011 | 7/29/2019 | 9/26/2047 | R$ 1,349,999.73 | 6/1/2025 | Ativa | T2010-048 | Realocar, na SE Banabuiú, um módulo de entrada de linha 230 kV, arranjo barra principal e transferência, para o primeiro circuito da LT 230kV Banabuiú - Fortaleza I, e adequação da proteção. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BANABUIU | EL 230 kV BANABUIU LT 230 kV BANABUIU /AQUIRAZ II C-3 CE | RB | FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE | 061/2001 | IPCA | RBNI | REA 2823/2011 | 10/2/2020 | 2/28/2037 | R$132,027.87 | 6/1/2025 | Ativa | T2010-086 | Adequar, na SE Banabuiú, um módulo de entrada de linha, arranjo barra dupla a quatro chaves, para a LT 230 kV Aquiraz II - Banabuiú. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BANABUIU | EL 230 kV BANABUIU LT 230 kV BANABUIU /AQUIRAZ II C-3 CE | RB | FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE | 061/2001 | IPCA | RBNI | REA 3631/2012 | 11/6/2020 | 1/22/2036 | R$138,077.76 | 6/1/2025 | Ativa | T2012-075 | Adequação, na SE Banabuiú, de um módulo de entrada de linha 230 kV, arranjo barra principal e transferência, destinado a conexão com a LT 230 kV Banabuiú - Aquiraz II *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BANABUIU | EL 230 kV BANABUIU LT 230 kV BANABUIU /AQUIRAZ II C-3 CE | RB | FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | EL 230 kV BANABUIU LT 230 kV BANABUIU /AQUIRAZ II C-3 CE | RB | FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2021 | 12/31/2048 | R$25,440.07 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BANABUIU | EL 230 kV BANABUIU LT 230 kV BANABUIU /AQUIRAZ II C-2 CE | RB | FT LT 230 kV BANABUIU /AQUIRAZ II C-2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | EL 230 kV BANABUIU LT 230 kV BANABUIU /AQUIRAZ II C-2 CE | RB | FT LT 230 kV BANABUIU /AQUIRAZ II C-2 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/18/2021 | 5/3/2050 | R$227,012.30 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BANABUIU | EL 230 kV BANABUIU LT 230 kV BANABUIU /AQUIRAZ II C-1 CE | RB | FT LT 230 kV BANABUIU /AQUIRAZ II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | EL 230 kV BANABUIU LT 230 kV BANABUIU /AQUIRAZ II C-1 CE | RB | FT LT 230 kV BANABUIU /AQUIRAZ II C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/4/2021 | 7/11/2049 | R$110,689.62 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BANABUIU | EL 230 kV BANABUIU LT 230 kV BANABUIU /ALEX C-1 CE | RB | FT LT 230 kV BANABUIU /ALEX C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | EL 230 kV BANABUIU LT 230 kV BANABUIU /ALEX C-1 CE | RB | FT LT 230 kV BANABUIU /ALEX C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$596,907.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | EL 230 kV BANABUIU LT 230 kV BANABUIU /ALEX C-1 CE | RB | FT LT 230 kV BANABUIU /ALEX C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2021 | 12/31/2035 | R$28,640.71 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BANABUIU | EL 230 kV BANABUIU LIBRA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BANABUIU | EL 230 kV BANABUIU LIBRA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/16/2021 | 9/15/2049 | R$6,196.31 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BANABUIU | EL 13,8 kV BANABUIU DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BANABUIU | BC 230 kV 50,5 Mvar BANABUIU BC2 CE | RB | FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$191,630.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | BC 230 kV 50,5 Mvar BANABUIU BC2 CE | RB | FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$537,748.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | BC 230 kV 50,5 Mvar BANABUIU BC1 CE | RB | FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$191,630.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BANABUIU | BC 230 kV 50,5 Mvar BANABUIU BC1 CE | RB | FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$537,748.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | TT 13,8/0,12 kV BANDEIRANTES TR4 GO | RB | FT TR 345/230 kV BANDEIRANTES TR4 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | TT 13,8/0,12 kV BANDEIRANTES TR2 GO | RB | FT TR 345/230 kV BANDEIRANTES TR2 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | TT 13,8/0,12 kV BANDEIRANTES TR1 GO | RB | FT TR 345/230 kV BANDEIRANTES TR1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | TR 345/230 kV BANDEIRANTES TRR2 GO | RB | FT TR 345/230 kV BANDEIRANTES TRR2 GO | 062/2001 | IPCA | RBNI | REA 10723/2021 | 7/15/2024 | 7/14/2059 | R$ 1,595,987.07 | 6/1/2025 | Ativa | T2021-078 | Instalar, na SE BANDEIRANTES, um autotransformador monofásico reserva TRR2 345/230-13,8 KV 75 MVA, para atendimento ao Banco de Autotransformadores AT05. Instalação de barramento de transferência de 345 kV e 230 kV para conexão do Banco AT05 à fase reserva. | ||
| AXIA Energia | BANDEIRANTES | TR 345/230 kV BANDEIRANTES TRR1 GO | RB | FT TR 345/230 kV BANDEIRANTES TRR1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$304,360.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | TR 345/230 kV BANDEIRANTES TRR1 GO | RB | FT TR 345/230 kV BANDEIRANTES TRR1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,167,947.32 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | TR 345/230 kV BANDEIRANTES TRR1 GO | RB | FT TR 345/230 kV BANDEIRANTES TRR1 GO | 062/2001 | IPCA | RMELP | DSP 1108/2024 | R$ 1,721,815.61 | 6/1/2025 | Prevista | T2024-093 | Obra de Substituição Completa: Substituição de trafo potencia AT87V - AUTOTRAFO RESERVA, na SE BANDEIRANTES. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia | BANDEIRANTES | TR 345/230 kV BANDEIRANTES TR5 GO | RB | FT TR 345/230 kV BANDEIRANTES TR5 GO | 062/2001 | IPCA | RBNI | REA 4326/2013 | 6/1/2016 | 10/22/2048 | R$ 3,105,718.32 | 6/1/2025 | Ativa | T2013-048 | Instalação, na Subestação Bandeirantes, de um banco de autotransformadores monofásicos 345/230 kV, de 3 x 75 MVA. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BANDEIRANTES | TR 345/230 kV BANDEIRANTES TR4 GO | RB | FT TR 345/230 kV BANDEIRANTES TR4 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$913,082.49 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | TR 345/230 kV BANDEIRANTES TR3 GO | RB | FT TR 345/230 kV BANDEIRANTES TR3 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$621,177.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | TR 345/230 kV BANDEIRANTES TR2 GO | RB | FT TR 345/230 kV BANDEIRANTES TR2 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$913,082.49 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | TR 345/230 kV BANDEIRANTES TR2 GO | RB | FT TR 345/230 kV BANDEIRANTES TR2 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,503,841.96 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | TR 345/230 kV BANDEIRANTES TR2 GO | RB | FT TR 345/230 kV BANDEIRANTES TR2 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 3,756,306.14 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | TR 345/230 kV BANDEIRANTES TR1 GO | RB | FT TR 345/230 kV BANDEIRANTES TR1 GO | 062/2001 | IPCA | RMEL | REA 8707/2020 | 8/18/2020 | 9/17/2054 | R$ 4,846,519.79 | 6/1/2025 | Ativa | T2019-022 | Obra de Substituição Completa - Substituição do Módulo de Equipamento – Banco de Autotransformador AT01 345/230/13, kV – 3x75 MVA na SE Bandeirantes. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BANDEIRANTES | TR 10,5/345 kV BANDEIRANTES TRR1 GO | RB | FT TR 10,5/345 kV BANDEIRANTES TRR1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$175,426.61 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | TR 10,5/345 kV BANDEIRANTES TRR1 GO | RB | FT TR 10,5/345 kV BANDEIRANTES TRR1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$673,178.08 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | TR 10,5/345 kV BANDEIRANTES TRR1 GO | RB | FT TR 10,5/345 kV BANDEIRANTES TRR1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$721,682.94 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | TR 10,5/345 kV BANDEIRANTES TR7 GO | RB | FT CE 100/-50 MvAr BANDEIRANTES CE2 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$530,028.60 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | TR 10,5/345 kV BANDEIRANTES TR7 GO | RB | FT CE 100/-50 MvAr BANDEIRANTES CE2 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,033,919.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | TR 10,5/345 kV BANDEIRANTES TR7 GO | RB | FT CE 100/-50 MvAr BANDEIRANTES CE2 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,180,470.76 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | TR 10,5/345 kV BANDEIRANTES TR6 GO | RB | FT CE 100/-50 MvAr BANDEIRANTES CE1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$530,028.60 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | TR 10,5/345 kV BANDEIRANTES TR6 GO | RB | FT CE 100/-50 MvAr BANDEIRANTES CE1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,033,919.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | TR 10,5/345 kV BANDEIRANTES TR6 GO | RB | FT CE 100/-50 MvAr BANDEIRANTES CE1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,180,470.76 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | RTL 345 kV 60 Mvar BANDEIRANTES RT2 GO | RB | FT RTL 345 kV 60 MVAr BANDEIRANTES RT2 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$473,185.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | RTL 345 kV 60 Mvar BANDEIRANTES RT1 GO | RB | FT RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$473,185.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | RTL 345 kV 60 Mvar BANDEIRANTES RT1 GO | RB | FT RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,815,793.02 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | RTL 345 kV 60 Mvar BANDEIRANTES RT1 GO | RB | FT RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO | 062/2001 | IPCA | RMELP | DSP 1108/2024 | R$ 1,822,809.97 | 6/1/2025 | Prevista | T2024-090 | Obra de Substituição Completa: Substituição de reator REATOR DE LINHA - RTBDSB1 FASE A (nº serie: 1534026, cod. mat.: 10184026), Substituição de reator REATOR DE LINHA - RTBDSB1 FASE B (nº serie: 1534023, cod. mat.: 10184027) e Substituição de reator REATOR DE LINHA - RTBDSB1 FASE C (nº serie: 1534025, cod. mat.: 10184028). As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia | BANDEIRANTES | RTL 345 kV 20 Mvar BANDEIRANTES RTR1 GO | RB | FT RTL 345 kV 20 Mvar BANDEIRANTES RTR1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$157,728.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | MG 345 kV BANDEIRANTES MG1 GO | RB | FT MG 345 kV BANDEIRANTES MG1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,216,898.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | MG 345 kV BANDEIRANTES MG1 GO | RB | FT MG 345 kV BANDEIRANTES MG1 GO | 062/2001 | IPCA | RBNI | REA 4326/2013 | 6/1/2016 | 12/28/2045 | R$597,756.80 | 6/1/2025 | Ativa | T2013-048 | Complementação do módulo geral da SE Bandeirantes com dois módulos de infraestrutura de manobra em 345 kV e em 230 kV, ambos em arranjo barra dupla a cinco chaves. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BANDEIRANTES | MG 345 kV BANDEIRANTES MG1 GO | RB | FT MG 345 kV BANDEIRANTES MG1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,669,696.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | MG 345 kV BANDEIRANTES MG1 GO | RB | FT MG 345 kV BANDEIRANTES MG1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 5,006,164.81 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | MG 345 kV BANDEIRANTES MG1 GO | RB | FT MG 345 kV BANDEIRANTES MG1 GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 8/25/2017 | 6/20/2032 | R$7,706.45 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | MG 345 kV BANDEIRANTES MG1 GO | RB | FT MG 345 kV BANDEIRANTES MG1 GO | 062/2001 | IPCA | RBNI | REA 10723/2021 | 7/15/2024 | 7/14/2055 | R$24,272.92 | 6/1/2025 | Ativa | T2021-078 | Infraestrutura de manobra em 345 kV referente a instalação de barramento de transferência de 345 kV para conexão do banco AT05 à fase reserva. | ||
| AXIA Energia | BANDEIRANTES | MG 345 kV BANDEIRANTES MG1 GO | RB | FT MG 345 kV BANDEIRANTES MG1 GO | 062/2001 | IPCA | RBNI | REA 10723/2021 | 7/15/2024 | 7/14/2055 | R$18,282.05 | 6/1/2025 | Ativa | T2021-078 | Infraestrutura de manobra em 230 kV referente a instalação de barramento de transferência de 345 kV para conexão do banco AT05 à fase reserva. | ||
| AXIA Energia | BANDEIRANTES | MG 345 kV BANDEIRANTES MG1 GO | RB | FT MG 345 kV BANDEIRANTES MG1 GO | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/4/2017 | 10/25/2040 | R$903,769.51 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BANDEIRANTES | MC 345 kV TR 345/230 kV BANDEIRANTES TRR2 GO | RB | FT TR 345/230 kV BANDEIRANTES TRR2 GO | 062/2001 | IPCA | RBNI | REA 10723/2021 | 7/15/2024 | 7/14/2048 | R$17,340.75 | 6/1/2025 | Ativa | T2021-078 | Instalação de barramento de transferência de 345 kV para conexão do banco AT05 à fase reserva. | ||
| AXIA Energia | BANDEIRANTES | MC 345 kV TR 345/230 kV BANDEIRANTES TR5 GO | RB | FT TR 345/230 kV BANDEIRANTES TR5 GO | 062/2001 | IPCA | RBNI | REA 4326/2013 | 6/1/2016 | 3/2/2047 | R$ 1,335,706.07 | 6/1/2025 | Ativa | T2013-048 | Instalação, na SE BANDEIRANTES, de um módulo de conexão, em 345 kV, para o autotransformador TR 345/230 kV BANDEIRANTES TR5 GO *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BANDEIRANTES | MC 345 kV TR 345/230 kV BANDEIRANTES TR4 GO | RB | FT TR 345/230 kV BANDEIRANTES TR4 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | MC 345 kV TR 345/230 kV BANDEIRANTES TR3 GO | RB | FT TR 345/230 kV BANDEIRANTES TR3 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | MC 345 kV TR 345/230 kV BANDEIRANTES TR3 GO | RB | FT TR 345/230 kV BANDEIRANTES TR3 GO | 062/2001 | IPCA | RMEL | REN 643/2014 | 6/8/2015 | 1/30/2037 | R$18,532.37 | 6/1/2025 | Ativa | Substituição 3 para-raios no vão do AT-03. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | MC 345 kV TR 345/230 kV BANDEIRANTES TR2 GO | RB | FT TR 345/230 kV BANDEIRANTES TR2 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | MC 345 kV TR 345/230 kV BANDEIRANTES TR2 GO | RB | FT TR 345/230 kV BANDEIRANTES TR2 GO | 062/2001 | IPCA | RMEL | REN 643/2014 | 8/26/2015 | 6/17/2046 | R$162,140.69 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 1 disjuntor (DJ822). Já realizada a substituição dos DJ832R DJ842R e DJ882C. PMI 2014-2017, incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | MC 345 kV TR 345/230 kV BANDEIRANTES TR2 GO | RB | FT TR 345/230 kV BANDEIRANTES TR2 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,046,877.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | MC 345 kV TR 345/230 kV BANDEIRANTES TR2 GO | RB | FT TR 345/230 kV BANDEIRANTES TR2 GO | 062/2001 | IPCA | RMEL | REN 643/2014 | 8/26/2015 | 6/19/2037 | R$28,352.98 | 6/1/2025 | Ativa | Substituição 3 para-raios no vão do AT-02. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | MC 345 kV TR 345/230 kV BANDEIRANTES TR1 GO | RB | FT TR 345/230 kV BANDEIRANTES TR1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | MC 345 kV TR 345/230 kV BANDEIRANTES TR1 GO | RB | FT TR 345/230 kV BANDEIRANTES TR1 GO | 062/2001 | IPCA | RBNI | REA 5861/2016 | 4/22/2019 | 4/21/2047 | R$33,976.18 | 6/1/2025 | Ativa | Autotrafo AT01 345/230/13,8 kV - 225 MVA - Modernização dos relés de proteção, devendo este ser estendido aos sistemas de comando, controle, supervisão, assim como os serviços auxiliares * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | MC 345 kV TR 10,5/345 kV BANDEIRANTES TR7 GO | RB | FT CE 100/-50 MvAr BANDEIRANTES CE2 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | MC 345 kV TR 10,5/345 kV BANDEIRANTES TR7 GO | RB | FT CE 100/-50 MvAr BANDEIRANTES CE2 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,046,877.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | MC 345 kV TR 10,5/345 kV BANDEIRANTES TR6 GO | RB | FT CE 100/-50 MvAr BANDEIRANTES CE1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | MC 345 kV TR 10,5/345 kV BANDEIRANTES TR6 GO | RB | FT CE 100/-50 MvAr BANDEIRANTES CE1 GO | 062/2001 | IPCA | RMEL | REN 643/2014 | 8/5/2015 | 5/27/2046 | R$161,836.48 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 1 disjuntor (DJ862). Já realizada a substituição dos DJ832R DJ842R e DJ882C. PMI 2014-2017, incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | MC 345 kV TR 10,5/345 kV BANDEIRANTES TR6 GO | RB | FT CE 100/-50 MvAr BANDEIRANTES CE1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,046,877.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | MC 345 kV RTL 345 kV 60 Mvar BANDEIRANTES RT2 GO | RB | FT RTL 345 kV 60 MVAr BANDEIRANTES RT2 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,441.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | MC 345 kV RTL 345 kV 60 Mvar BANDEIRANTES RT2 GO | RB | FT RTL 345 kV 60 MVAr BANDEIRANTES RT2 GO | 062/2001 | IPCA | RMEL | REN 643/2014 | 3/24/2013 | 8/15/2041 | R$177,264.41 | 6/1/2025 | Ativa | Substituição de 1 disjuntor (DJ842R). Melhoria referente ao PMI 2014-2017, cadastrada no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | MC 345 kV RTL 345 kV 60 Mvar BANDEIRANTES RT1 GO | RB | FT RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,441.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | MC 345 kV RTL 345 kV 60 Mvar BANDEIRANTES RT1 GO | RB | FT RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO | 062/2001 | IPCA | RMEL | REN 643/2014 | 3/17/2013 | 8/8/2041 | R$177,132.59 | 6/1/2025 | Ativa | Substituição de 1 disjuntor (DJ832R). Melhoria referente ao PMI 2014-2017, cadastrada no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | MC 345 kV RTL 345 kV 60 Mvar BANDEIRANTES RT1 GO | RB | FT RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO | 062/2001 | IPCA | RMEL | REN 905/2020 | 2/10/2021 | 2/9/2045 | R$50,137.62 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BANDEIRANTES | MC 345 kV BC 345 kV 91,5 Mvar BANDEIRANTES BC1 GO | RB | FT BC 345 kV 91,5 MVAr BANDEIRANTES BC1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$257,964.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | MC 345 kV BC 345 kV 91,5 Mvar BANDEIRANTES BC1 GO | RB | FT BC 345 kV 91,5 MVAr BANDEIRANTES BC1 GO | 062/2001 | IPCA | RMEL | REN 643/2014 | 4/6/2013 | 9/28/2041 | R$131,365.29 | 6/1/2025 | Ativa | Substituição de 1 disjuntor (DJ882C). Melhoria referente ao PMI 2014-2017, cadastrada no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | MC 230 kV TR 345/230 kV BANDEIRANTES TRR2 GO | RB | FT TR 345/230 kV BANDEIRANTES TRR2 GO | 062/2001 | IPCA | RBNI | REA 10723/2021 | 7/15/2024 | 7/14/2048 | R$7,179.52 | 6/1/2025 | Ativa | T2021-078 | Instalação de barramento de transferência de 230 kV para conexão do banco AT05 à fase reserva. | ||
| AXIA Energia | BANDEIRANTES | MC 230 kV TR 345/230 kV BANDEIRANTES TR5 GO | RB | FT TR 345/230 kV BANDEIRANTES TR5 GO | 062/2001 | IPCA | RBNI | REA 4326/2013 | 6/1/2016 | 8/17/2046 | R$971,197.48 | 6/1/2025 | Ativa | T2013-048 | Instalação, na SE BANDEIRANTES, de um módulo de conexão, em 230 kV, para o autotransformador TR 345/230 kV BANDEIRANTES TR5 GO *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BANDEIRANTES | MC 230 kV TR 345/230 kV BANDEIRANTES TR4 GO | RB | FT TR 345/230 kV BANDEIRANTES TR4 GO | 062/2001 | IPCA | RBNI | REA 2230/2009 | 4/6/2015 | 9/28/2042 | R$54,996.66 | 6/1/2025 | Ativa | T2009-237 | Substituir 3 TCs por superação. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BANDEIRANTES | MC 230 kV TR 345/230 kV BANDEIRANTES TR4 GO | RB | FT TR 345/230 kV BANDEIRANTES TR4 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$154,583.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | MC 230 kV TR 345/230 kV BANDEIRANTES TR3 GO | RB | FT TR 345/230 kV BANDEIRANTES TR3 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$154,583.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | MC 230 kV TR 345/230 kV BANDEIRANTES TR3 GO | RB | FT TR 345/230 kV BANDEIRANTES TR3 GO | 062/2001 | IPCA | RMEL | REN 643/2014 | 6/8/2015 | 1/30/2037 | R$12,635.90 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição 3 para-raios no vão do AT-03. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | MC 230 kV TR 345/230 kV BANDEIRANTES TR2 GO | RB | FT TR 345/230 kV BANDEIRANTES TR2 GO | 062/2001 | IPCA | RBNI | REA 2230/2009 | 4/6/2015 | 9/28/2042 | R$120,673.35 | 6/1/2025 | Ativa | T2009-237 | Substituir chaves seccionadoras n. 721, 723, 725, 727e 729, por superação. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BANDEIRANTES | MC 230 kV TR 345/230 kV BANDEIRANTES TR2 GO | RB | FT TR 345/230 kV BANDEIRANTES TR2 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$154,583.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | MC 230 kV TR 345/230 kV BANDEIRANTES TR2 GO | RB | FT TR 345/230 kV BANDEIRANTES TR2 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$593,194.91 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | MC 230 kV TR 345/230 kV BANDEIRANTES TR2 GO | RB | FT TR 345/230 kV BANDEIRANTES TR2 GO | 062/2001 | IPCA | RMEL | REN 643/2014 | 8/26/2015 | 6/19/2037 | R$19,331.88 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição 3 para-raios no vão do AT-02. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | MC 230 kV TR 345/230 kV BANDEIRANTES TR1 GO | RB | FT TR 345/230 kV BANDEIRANTES TR1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$154,583.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | MC 230 kV TR 345/230 kV BANDEIRANTES TR1 GO | RB | FT TR 345/230 kV BANDEIRANTES TR1 GO | 062/2001 | IPCA | RBNI | REA 5861/2016 | 4/22/2019 | 4/21/2047 | R$33,976.18 | 6/1/2025 | Ativa | Autotrafo AT01 345/230/13,8 kV - 225 MVA - Modernização dos relés de proteção, devendo este ser estendido aos sistemas de comando, controle, supervisão, assim como os serviços auxiliares * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | MC 230 kV TR 345/230 kV BANDEIRANTES TR1 GO | RB | FT TR 345/230 kV BANDEIRANTES TR1 GO | 062/2001 | IPCA | RMEL | REN 905/2020 | 4/30/2017 | 4/29/2041 | R$29,439.56 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BANDEIRANTES | MC 13,8 kV TT 13,8/0,12 kV BANDEIRANTES TR4 GO | RB | FT TR 345/230 kV BANDEIRANTES TR4 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | MC 13,8 kV TT 13,8/0,12 kV BANDEIRANTES TR2 GO | RB | FT TR 345/230 kV BANDEIRANTES TR2 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | MC 13,8 kV TT 13,8/0,12 kV BANDEIRANTES TR1 GO | RB | FT TR 345/230 kV BANDEIRANTES TR1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | IB 345 kV MG 345 kV BANDEIRANTES MG1 GO IB1 | RB | FT MG 345 kV BANDEIRANTES MG1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | IB 345 kV MG 345 kV BANDEIRANTES MG1 GO IB1 | RB | FT MG 345 kV BANDEIRANTES MG1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$928,957.53 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | IB 345 kV MG 345 kV BANDEIRANTES MG1 GO IB1 | RB | FT MG 345 kV BANDEIRANTES MG1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$995,892.20 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | IB 230 kV MG 345 kV BANDEIRANTES MG1 GO IB1 | RB | FT MG 345 kV BANDEIRANTES MG1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$127,017.00 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | IB 230 kV MG 345 kV BANDEIRANTES MG1 GO IB1 | RB | FT MG 345 kV BANDEIRANTES MG1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$487,412.14 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | EL 345 kV BANDEIRANTES LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | EL 345 kV BANDEIRANTES LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | 062/2001 | IPCA | RMEL | REN 905/2020 | 2/26/2015 | 2/25/2039 | R$79,783.09 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BANDEIRANTES | EL 345 kV BANDEIRANTES LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | EL 345 kV BANDEIRANTES LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/6/2014 | 5/5/2038 | R$38,500.68 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BANDEIRANTES | EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF | RB | FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF | RB | FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF | 062/2001 | IPCA | RMEL | REN 443/2011 | 5/5/2014 | 11/28/2034 | R$8,826.99 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LTBDSB1 STBD FASE A - Nº Oper: PR8330T - PMI (003145/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF | RB | FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF | 062/2001 | IPCA | RMEL | REN 443/2011 | 5/5/2014 | 11/28/2034 | R$8,826.99 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LTBDSB1 STBD FASE B - Nº Oper: PR8330T - PMI (003146/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF | RB | FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF | 062/2001 | IPCA | RMEL | REN 443/2011 | 5/5/2014 | 11/28/2034 | R$8,826.99 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LTBDSB1 STBD FASE C - Nº Oper: PR8330T - PMI (003147/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF | RB | FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF | 062/2001 | IPCA | RBNI | REA 4347/2013 | 5/3/2017 | 11/23/2049 | R$136,501.61 | 6/1/2025 | Ativa | Substituição de 1 disjuntor 8332 (capacidade necessária de corrente nominal maior ou igual a 4000 A) do vão Samambaia C1;: * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 * Receita alterada no recurso contra a REH 2.407/2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF | RB | FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF | 062/2001 | IPCA | RBNI | REA 4347/2013 | 5/3/2017 | 11/24/2046 | R$71,439.00 | 6/1/2025 | Ativa | Substituição de 3 transformadores de corrente (capacidade necessária de corrente nominal maior ou igual a 4000 A) do vão Samambaia C1 - 345 kV; * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 * Receita alterada no recurso contra a REH 2.407/2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF | RB | FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/31/2019 | 2/2/2049 | R$26,809.22 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BANDEIRANTES | EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /PIRINEUS C-1 GO | RB | FT LT 345 kV BANDEIRANTES /PIRINEUS C-1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /PIRINEUS C-1 GO | RB | FT LT 345 kV BANDEIRANTES /PIRINEUS C-1 GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 5/25/2014 | 12/18/2034 | R$8,852.49 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LTBDSB2 STBD FASE A - Nº Oper: PR8340T - PMI (003154/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /PIRINEUS C-1 GO | RB | FT LT 345 kV BANDEIRANTES /PIRINEUS C-1 GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 5/25/2014 | 12/18/2034 | R$8,852.49 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LTBDSB2 STBD FASE B - Nº Oper: PR8340T - PMI (003155/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /PIRINEUS C-1 GO | RB | FT LT 345 kV BANDEIRANTES /PIRINEUS C-1 GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 5/25/2014 | 12/18/2034 | R$8,852.49 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LTBDSB2 STBD FASE C - Nº Oper: PR8340T - PMI (003156/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /PIRINEUS C-1 GO | RB | FT LT 345 kV BANDEIRANTES /PIRINEUS C-1 GO | 062/2001 | IPCA | RBNI | REA 4347/2013 | 5/3/2017 | 11/24/2046 | R$71,439.00 | 6/1/2025 | Ativa | Substituição de 3 transformadores de corrente (capacidade necessária de corrente nominal maior ou igual a 4000 A) do vão Samambaia C2; * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /PIRINEUS C-1 GO | RB | FT LT 345 kV BANDEIRANTES /PIRINEUS C-1 GO | 062/2001 | IPCA | RBNI | REA 4347/2013 | 5/3/2017 | 11/23/2049 | R$136,501.61 | 6/1/2025 | Ativa | Substituição de 1 disjuntor (capacidade necessária de corrente nominal maior ou igual a 4000 A) do vão Samambaia 2 (DJ 8342); * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 * Receita alterada no recurso contra a REH 2.407/2018. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-2 GO | RB | FT LT 230 kV XAVANTES /BANDEIRANTES C-2 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$215,593.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-2 GO | RB | FT LT 230 kV XAVANTES /BANDEIRANTES C-2 GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/14/2014 | 12/8/2035 | R$6,196.21 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LIXABD2 STBD FASE A - Nº Oper: PR7350T - PMI (003142/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-2 GO | RB | FT LT 230 kV XAVANTES /BANDEIRANTES C-2 GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/14/2014 | 12/8/2035 | R$6,196.21 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LIXABD2 STBD FASE B - Nº Oper: PR7350T - PMI (003143/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-2 GO | RB | FT LT 230 kV XAVANTES /BANDEIRANTES C-2 GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/14/2014 | 12/8/2035 | R$6,196.21 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LIXABD2 STBD FASE C - Nº Oper: PR7350T - PMI (003144/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO | RB | FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO | 062/2001 | IPCA | RBNI | REA 2230/2009 | 4/6/2015 | 9/28/2042 | R$125,266.54 | 6/1/2025 | Ativa | T2009-237 | Substituir chaves seccionadoras n. 7341, 7343, 7345, 7347, 7349, por superação. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BANDEIRANTES | EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO | RB | FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO | 062/2001 | IPCA | RBNI | REA 2230/2009 | 4/6/2015 | 9/30/2032 | R$16,449.99 | 6/1/2025 | Ativa | T2009-237 | Substituir bobinas de bloqueio por superação. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BANDEIRANTES | EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO | RB | FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$215,593.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO | RB | FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$827,315.35 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO | RB | FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/12/2014 | 12/6/2035 | R$6,194.51 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LIXABD1 STBD FASE A - Nº Oper: PR7340T - PMI (003139/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO | RB | FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/12/2014 | 12/6/2035 | R$6,194.51 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LIXABD1 STBD FASE B - Nº Oper: PR7340T - PMI (003140/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO | RB | FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/12/2014 | 12/6/2035 | R$6,194.51 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LIXABD1 STBD FASE C - Nº Oper: PR7340T - PMI (003141/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO | RB | FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$215,593.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO | RB | FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/20/2014 | 12/14/2035 | R$6,201.29 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LIAHBD2 STBD FASE A - Nº Oper: PR7377 - PMI (003136/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO | RB | FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/20/2014 | 12/14/2035 | R$6,201.29 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LIAHBD2 STBD FASE B - Nº Oper: PR7377 - PMI (003137/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO | RB | FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/20/2014 | 12/14/2035 | R$6,201.29 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LIAHBD2 STBD FASE C - Nº Oper: PR7377 - PMI (003138/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO | RB | FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/21/2014 | 11/20/2038 | R$26,608.71 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BANDEIRANTES | EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO | RB | FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$215,593.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO | RB | FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$827,315.35 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO | RB | FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/19/2014 | 12/13/2035 | R$6,200.45 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LIAHBD1 STBD FASE A - Nº Oper: PR7367 - PMI (003133/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO | RB | FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/19/2014 | 12/13/2035 | R$6,200.45 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LIAHBD1 STBD FASE B - Nº Oper: PR7367 - PMI (003134/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO | RB | FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/19/2014 | 12/13/2035 | R$6,200.45 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LIAHBD1 STBD FASE C - Nº Oper: PR7367 - PMI (003135/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BANDEIRANTES | EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO | RB | FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/20/2014 | 11/19/2038 | R$26,605.53 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BANDEIRANTES | CE 100/-50 Mvar BANDEIRANTES CE2 GO | RB | FT CE 100/-50 MvAr BANDEIRANTES CE2 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,924,296.51 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | CE 100/-50 Mvar BANDEIRANTES CE2 GO | RB | FT CE 100/-50 MvAr BANDEIRANTES CE2 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 7,384,251.58 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | CE 100/-50 Mvar BANDEIRANTES CE2 GO | RB | FT CE 100/-50 MvAr BANDEIRANTES CE2 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 7,916,312.99 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | CE 100/-50 Mvar BANDEIRANTES CE1 GO | RB | FT CE 100/-50 MvAr BANDEIRANTES CE1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,924,296.51 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | CE 100/-50 Mvar BANDEIRANTES CE1 GO | RB | FT CE 100/-50 MvAr BANDEIRANTES CE1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 7,384,251.58 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | BC 345 kV 91,5 Mvar BANDEIRANTES BC1 GO | RB | FT BC 345 kV 91,5 MVAr BANDEIRANTES BC1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$240,734.90 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BANDEIRANTES | BC 345 kV 91,5 Mvar BANDEIRANTES BC1 GO | RB | FT BC 345 kV 91,5 MVAr BANDEIRANTES BC1 GO | 062/2001 | IPCA | RMELP | DSP 1108/2024 | R$708,755.89 | 6/1/2025 | Prevista | T2024-076 | Obra de Substituição Completa: Substituição do banco capacitor, na SE BANDEIRANTES 345 Kv. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia Norte | BARRA PEIXE | TR 230/138 kV BARRA PEIXE TRR1 MT | RBF | FT TR 230/138 kV BARRA PEIXE TRR1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$157,883.99 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | TR 230/138 kV BARRA PEIXE TRR1 MT | RBF | FT TR 230/138 kV BARRA PEIXE TRR1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$342,754.09 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | TR 230/138 kV BARRA PEIXE TRR1 MT | RBF | FT TR 230/138 kV BARRA PEIXE TRR1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$328,734.43 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | TR 230/138 kV BARRA PEIXE TR5 MT | RBF | FT TR 230/138 kV BARRA PEIXE TR5 MT | 058/2001 | IPCA | RBNI | REA 5687/2016 | 8/13/2018 | 1/18/2053 | R$ 2,064,212.73 | 6/1/2025 | Ativa | T2015-078 | INSTALAÇÃO NA SE BARRA DO PEIXE DE AUTOTRANSFORMADOR TRIFÁSICO, 230/138KV, 100MVA, TR5 *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | BARRA PEIXE | TR 230/138 kV BARRA PEIXE TR4 MT | RBF | FT TR 230/138 kV BARRA PEIXE TR4 MT | 058/2001 | IPCA | RBNI | REA 5687/2016 | 8/13/2018 | 4/19/2053 | R$ 2,063,384.25 | 6/1/2025 | Ativa | T2015-078 | INSTALAÇÃO NA SE BARRA DO PEIXE DE AUTOTRANSFORMADOR TRIFÁSICO, 230/138KV, 100MVA, TR4 *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | BARRA PEIXE | TR 230/138 kV BARRA PEIXE TR3 MT | RBF | FT TR 230/138 kV BARRA PEIXE TR3 MT | 058/2001 | IPCA | RBNI | REA 2384/2010 | 11/28/2012 | 1/25/2047 | R$ 1,051,169.24 | 6/1/2025 | Ativa | T2010-001 | Instalação do 3º autotransformador 230/138/13,8 kV - 50 MVA, na SE Barra do Peixe. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | BARRA PEIXE | TR 230/138 kV BARRA PEIXE TR2 MT | RBF | FT TR 230/138 kV BARRA PEIXE TR2 MT | 058/2001 | IPCA | RBNI | REA 2384/2010 | 10/24/2012 | 1/21/2047 | R$ 1,048,722.36 | 6/1/2025 | Ativa | T2009-180 | Instalação do 2º autotransformador 230/138/13,8 kV - 50 MVA, na SE Barra do Peixe. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | BARRA PEIXE | TR 230/138 kV BARRA PEIXE TR1 MT | RBF | FT TR 230/138 kV BARRA PEIXE TR1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$473,601.11 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | TR 230/138 kV BARRA PEIXE TR1 MT | RBF | FT TR 230/138 kV BARRA PEIXE TR1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,028,151.89 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | TR 230/138 kV BARRA PEIXE TR1 MT | RBF | FT TR 230/138 kV BARRA PEIXE TR1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$986,097.41 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | TR 230/138 kV BARRA PEIXE TR1 MT | RBF | FT TR 230/138 kV BARRA PEIXE TR1 MT | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 12/19/2016 | 12/18/2031 | R$33,337.00 | 6/1/2025 | Ativa | Implantacao de sistema de medicao e monitoramento online de Buchas Condensivas do equipamento BPAT601 para integrar ao SISTEMA DE SUPERVISAO SAGE Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | BARRA PEIXE | RTL 230 kV 20 Mvar BARRA PEIXE RT3 MT | RB | FT RTL 230 kV 20 MVAr BARRA PEIXE RT3 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$344,016.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | RTL 230 kV 20 Mvar BARRA PEIXE RT3 MT | RB | FT RTL 230 kV 20 MVAr BARRA PEIXE RT3 MT | 058/2001 | IPCA | RMEL | REN 905/2020 | 12/29/2019 | 12/8/2055 | R$21,694.81 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | BARRA PEIXE | RTL 230 kV 20 Mvar BARRA PEIXE RT3 MT | RB | FT RTL 230 kV 20 MVAr BARRA PEIXE RT3 MT | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 12/19/2016 | 12/18/2031 | R$20,253.97 | 6/1/2025 | Ativa | Implantacao de sistema de medicao e monitoramento online de Buchas Condensivas do equipamento BPRE603 para integrar ao SISTEMA DE SUPERVISAO SAGE Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | BARRA PEIXE | RTL 230 kV 20 Mvar BARRA PEIXE RT1 MT | RB | FT RTL 230 kV 20 MVAr BARRA PEIXE RT1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$344,016.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | RTL 230 kV 20 Mvar BARRA PEIXE RT1 MT | RB | FT RTL 230 kV 20 MVAr BARRA PEIXE RT1 MT | 058/2001 | IPCA | RMEL | REN 443/2011 | 6/5/2017 | 6/4/2032 | R$81,052.13 | 6/1/2025 | Ativa | Implantação de sistema de medição e monitoramento on-line de Buchas Condensivas do equipamento BPRE6-01 para integrar ao SISTEMA DE SUPERVISÃO SAGE. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | BARRA PEIXE | RTL 230 kV 20 Mvar BARRA PEIXE RT1 MT | RB | FT RTL 230 kV 20 MVAr BARRA PEIXE RT1 MT | 058/2001 | IPCA | RMEL | REN 905/2020 | 8/21/2019 | 7/31/2055 | R$56,875.92 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | BARRA PEIXE | RTB 230 kV 20 Mvar BARRA PEIXE RT2 MT | RB | FT RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$344,016.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | RTB 230 kV 20 Mvar BARRA PEIXE RT2 MT | RB | FT RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$746,832.58 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | RTB 230 kV 20 Mvar BARRA PEIXE RT2 MT | RB | FT RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$716,284.90 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | MG 230 kV BARRA PEIXE MG1 MT | RB | FT MG 230 kV BARRA PEIXE MG1 MT | 058/2001 | IPCA | RBNI | REA 2384/2010 | 10/24/2012 | 9/4/2040 | R$ 1,078,335.30 | 6/1/2025 | Ativa | T2009-180 | Complemento de módulo de infraestrutura geral no setor de 230 kV e implantação de módulo de infraestrutura geral no setor de 138 kV, dois módulos de infraestrutura de manobra no setor de 230 kV e quatro módulos de infraestrutura de manobra no setor de 138 kV. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | BARRA PEIXE | MG 230 kV BARRA PEIXE MG1 MT | RB | FT MG 230 kV BARRA PEIXE MG1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$651,889.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | MG 230 kV BARRA PEIXE MG1 MT | RB | FT MG 230 kV BARRA PEIXE MG1 MT | 058/2001 | IPCA | RBNI | REA 5687/2016 | 8/13/2018 | 11/8/2043 | R$176,318.50 | 6/1/2025 | Ativa | T2015-078 | Adequação, na SE BARRA PEIXE, de um módulo geral MG1, em 230 kV, arranjo BD4. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | BARRA PEIXE | MG 230 kV BARRA PEIXE MG1 MT | RB | FT MG 230 kV BARRA PEIXE MG1 MT | 058/2001 | IPCA | RBNI | REA 5687/2016 | 8/13/2018 | 8/27/2047 | R$134,580.23 | 6/1/2025 | Ativa | T2015-078 | Adequação, na SE BARRA do PEIXE, de módulo de manobra, em 138 kV, arranjo BPT, para instalação de dois autotransformadores trifásicos. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | BARRA PEIXE | MG 230 kV BARRA PEIXE MG1 MT | RB | FT MG 230 kV BARRA PEIXE MG1 MT | 058/2001 | IPCA | RBNI | REA 5687/2016 | 8/13/2018 | 5/17/2038 | R$77,642.31 | 6/1/2025 | Ativa | T2015-078 | COMPLEMENTO DE MÓDULO DE INFRA-ESTRUTURA GERAL 230KV, SERVIÇO AUXILIAR E TERRENO, PARA INSTALAÇÃO DE DOIS AUTOTRANSFORMADORES TRIFÁSICOS. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | BARRA PEIXE | MG 230 kV BARRA PEIXE MG1 MT | RB | FT MG 230 kV BARRA PEIXE MG1 MT | 058/2001 | IPCA | RBNI | REA 5687/2016 | 8/13/2018 | 8/12/2058 | R$41,067.35 | 6/1/2025 | Ativa | T2015-078 | Adequação do módulo geral, EXTENSÃO DE BARRAMENTO DE 138KV, para instalação de dois autotransformadores trifásicos. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | BARRA PEIXE | MG 230 kV BARRA PEIXE MG1 MT | RB | FT MG 230 kV BARRA PEIXE MG1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,415,201.36 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | MG 230 kV BARRA PEIXE MG1 MT | RB | FT MG 230 kV BARRA PEIXE MG1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,357,315.40 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | MG 230 kV BARRA PEIXE MG1 MT | RB | FT MG 230 kV BARRA PEIXE MG1 MT | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 2/22/2018 | 2/21/2043 | R$24,023.94 | 6/1/2025 | Ativa | INSTALACAO SISTEMA DE DETECCAO E ALARME CONTRA INCENDIO Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | BARRA PEIXE | MG 230 kV BARRA PEIXE MG1 MT | RB | FT MG 230 kV BARRA PEIXE MG1 MT | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 12/17/2020 | 12/16/2041 | R$66,679.23 | 6/1/2025 | Ativa | MODERNIZAÇÃO - REGISTRADOR DIGITAL DE PERTURBACOES MULTIFUNCAOREASON /RPV P310 Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | BARRA PEIXE | MC 230 kV TR 230/138 kV BARRA PEIXE TR5 MT | RBF | FT TR 230/138 kV BARRA PEIXE TR5 MT | 058/2001 | IPCA | RBNI | REA 5687/2016 | 8/13/2018 | 8/28/2049 | R$ 1,406,461.40 | 6/1/2025 | Ativa | T2015-078 | Instalação, na SE BARRA PEIXE, de um módulo de conexão, em 230 kV, para o autotransformador TR 230/138 kV BARRA PEIXE TR5 MT *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | BARRA PEIXE | MC 230 kV TR 230/138 kV BARRA PEIXE TR4 MT | RBF | FT TR 230/138 kV BARRA PEIXE TR4 MT | 058/2001 | IPCA | RBNI | REA 5687/2016 | 8/13/2018 | 11/18/2049 | R$ 1,449,883.65 | 6/1/2025 | Ativa | T2015-078 | Instalação, na SE BARRA PEIXE, de um módulo de conexão, em 230 kV, para o autotransformador TR 230/138 kV BARRA PEIXE TR4 MT *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | BARRA PEIXE | MC 230 kV TR 230/138 kV BARRA PEIXE TR3 MT | RBF | FT TR 230/138 kV BARRA PEIXE TR3 MT | 058/2001 | IPCA | RBNI | REA 2384/2010 | 11/28/2012 | 1/15/2043 | R$911,069.68 | 6/1/2025 | Ativa | T2010-001 | Instalação de um módulo de conexão de transformador em 230 kV na SE Barra do Peixe, arranjo barra dupla a quatro chaves - BD4, para o 3º autotransformador 230/138/13,8 kV - 50 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | BARRA PEIXE | MC 230 kV TR 230/138 kV BARRA PEIXE TR2 MT | RBF | FT TR 230/138 kV BARRA PEIXE TR2 MT | 058/2001 | IPCA | RBNI | REA 2384/2010 | 10/24/2012 | 6/18/2043 | R$909,989.87 | 6/1/2025 | Ativa | T2009-180 | Instalação de um módulo de conexão de transformador em 230 kV, arranjo barra dupla a quatro chaves - BD4, na SE Barra do Peixe, para o 2º autotransformador 230/138/13,8 kV - 50 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | BARRA PEIXE | MC 230 kV TR 230/138 kV BARRA PEIXE TR1 MT | RBF | FT TR 230/138 kV BARRA PEIXE TR1 MT | 058/2001 | IPCA | RBNI | REA 2384/2010 | 11/28/2012 | 1/9/2041 | R$188,064.80 | 6/1/2025 | Ativa | T2009-180 | Instalação de painel com sistema de controle específico para o paralelismo do autotransformador existente com o autotransformador a ser implantado na SE Barra do Peixe, no setor de 230 kV. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | BARRA PEIXE | MC 230 kV TR 230/138 kV BARRA PEIXE TR1 MT | RBF | FT TR 230/138 kV BARRA PEIXE TR1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$183,181.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | MC 230 kV TR 230/138 kV BARRA PEIXE TR1 MT | RBF | FT TR 230/138 kV BARRA PEIXE TR1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$397,673.32 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | MC 230 kV RTL 230 kV 20 Mvar BARRA PEIXE RT3 MT | RB | FT RTL 230 kV 20 MVAr BARRA PEIXE RT3 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$109,485.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | MC 230 kV RTL 230 kV 20 Mvar BARRA PEIXE RT1 MT | RB | FT RTL 230 kV 20 MVAr BARRA PEIXE RT1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$109,485.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | MC 230 kV RTB 230 kV 20 Mvar BARRA PEIXE RT2 MT | RB | FT RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$176,154.16 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | MC 230 kV RTB 230 kV 20 Mvar BARRA PEIXE RT2 MT | RB | FT RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$382,417.26 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | MC 230 kV RTB 230 kV 20 Mvar BARRA PEIXE RT2 MT | RB | FT RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$366,775.25 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | MC 230 kV CR 230 kV 37,2 Mvar BARRA PEIXE BC3 MT | RB | FT CR 230 kV 37,2 Mvar BARRA PEIXE BC3 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$198,742.55 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | MC 230 kV CR 230 kV 35 Mvar BARRA PEIXE BC2 MT | RB | FT CR 230 kV 35 Mvar BARRA PEIXE BC2 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$198,742.55 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | MC 230 kV CR 230 kV 120 Mvar BARRA PEIXE CR1 MT | RB | FT CR 230 kV 120 Mvar BARRA PEIXE CR1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$198,742.55 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | MC 138 kV TR 230/138 kV BARRA PEIXE TR5 MT | RBF | FT TR 230/138 kV BARRA PEIXE TR5 MT | 058/2001 | IPCA | RBNI | REA 5687/2016 | 8/13/2018 | 7/20/2049 | R$ 1,175,290.87 | 6/1/2025 | Ativa | T2015-078 | Instalação, na SE BARRA PEIXE, de um módulo de conexão, em 138 kV, para o autotransformador TR 230/138 kV BARRA PEIXE TR5 MT *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | BARRA PEIXE | MC 138 kV TR 230/138 kV BARRA PEIXE TR4 MT | RBF | FT TR 230/138 kV BARRA PEIXE TR4 MT | 058/2001 | IPCA | RBNI | REA 5687/2016 | 8/13/2018 | 5/26/2049 | R$ 1,176,089.75 | 6/1/2025 | Ativa | T2015-078 | Instalação, na SE BARRA PEIXE, de um módulo de conexão, em 138 kV, para o autotransformador TR 230/138 kV BARRA PEIXE TR4 MT *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | BARRA PEIXE | MC 138 kV TR 230/138 kV BARRA PEIXE TR3 MT | RBF | FT TR 230/138 kV BARRA PEIXE TR3 MT | 058/2001 | IPCA | RBNI | REA 2384/2010 | 11/28/2012 | 10/16/2043 | R$670,461.90 | 6/1/2025 | Ativa | T2010-001 | Instalação de um módulo de conexão de transformador em 138 kV, arranjo barra principal e transferência - BPT, na SE Barra do Peixe para o 3º autotransformador 230/138/13,8 kV - 50 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | BARRA PEIXE | MC 138 kV TR 230/138 kV BARRA PEIXE TR2 MT | RBF | FT TR 230/138 kV BARRA PEIXE TR2 MT | 058/2001 | IPCA | RBNI | REA 2384/2010 | 10/24/2012 | 10/23/2044 | R$670,862.95 | 6/1/2025 | Ativa | T2009-180 | Instalação de um módulo de conexão de transformador em 138 kV, arranjo barra dupla principal e transferência - BPT, na SE Barra do Peixe, para o 2º autotransformador 230/138/13,8 kV - 50 MVA *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | BARRA PEIXE | MC 138 kV TR 230/138 kV BARRA PEIXE TR1 MT | RBF | FT TR 230/138 kV BARRA PEIXE TR1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$122,666.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | MC 138 kV TR 230/138 kV BARRA PEIXE TR1 MT | RBF | FT TR 230/138 kV BARRA PEIXE TR1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$266,299.61 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | IB 230 kV MG 230 kV BARRA PEIXE MG1 MT IB1 | RB | FT MG 230 kV BARRA PEIXE MG1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$158,618.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | IB 138 kV MG 230 kV BARRA PEIXE MG1 MT IB1 | DIT | 058/2001 | IPCA | RCDM | REA 2384/2010 | 10/24/2012 | 9/25/2044 | R$540,106.75 | 6/1/2025 | Ativa | T2009-180 | Instalação de um módulo de interligação de barras na SE Barra do Peixe em 138 kV, arranjo barra principal e transferência - BPT. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | BARRA PEIXE | EL 230 kV BARRA PEIXE LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT | RB | FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$260,258.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | EL 230 kV BARRA PEIXE LT 230 kV RIO VERDE FUR /BARRA PEIXE C-1 GO/MT | RB | FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-1 GO/MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$260,258.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | EL 230 kV BARRA PEIXE LT 230 kV RIO VERDE FUR /BARRA PEIXE C-1 GO/MT | RB | FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-1 GO/MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$565,000.48 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | EL 230 kV BARRA PEIXE LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT | RB | FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$260,258.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | EL 230 kV BARRA PEIXE LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT | RB | FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$565,000.48 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | EL 230 kV BARRA PEIXE LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT | RB | FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$260,258.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | EL 138 kV BARRA PEIXE DIST2 | DIT | 058/2001 | IPCA | RCDM | REA 2384/2010 | 11/28/2012 | 1/7/2044 | R$717,815.84 | 6/1/2025 | Ativa | T2009-180 | Instalação de um módulo de entrada de linha em 138 kV na SE Barra do Peixe, arranjo barra principal e transferência - BPT, associada à linha de transmissão LT 138 kV Barra do Peixe - Barra do Garça C1. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | BARRA PEIXE | EL 13,8 kV BARRA PEIXE DIST1 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,540.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | BARRA PEIXE | EL 13,8 kV BARRA PEIXE DIST1 | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$129,256.82 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | BARRA PEIXE | CR 230 kV 37,2 Mvar BARRA PEIXE BC3 MT | RB | FT CR 230 kV 37,2 Mvar BARRA PEIXE BC3 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$198,227.82 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | CR 230 kV 35 Mvar BARRA PEIXE BC2 MT | RB | FT CR 230 kV 35 Mvar BARRA PEIXE BC2 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$192,838.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | BARRA PEIXE | CR 230 kV 120 Mvar BARRA PEIXE CR1 MT | RB | FT CR 230 kV 120 Mvar BARRA PEIXE CR1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$312,343.09 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | TT 69/13,8 kV BARREIRAS TA1 BA | DIT | 061/2001 | IPCA | RCDM | REA 4347/2013 | 5/7/2017 | 5/10/2047 | R$197,802.22 | 6/1/2025 | Ativa | Obra de Substituição Completa - Substituição do reator de aterramento 02A1 existente por um de impedância não superior a 20 Ohms/fase (capacidade necessária de 20 ohm/fase X0/X1 = 3 Tensão na fase sã = 1,27pu). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BARREIRAS | TR 69/13,8 kV BARREIRAS TR1 BA | RB | FT MG 230 kV BARREIRAS MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | TR 230/69 kV BARREIRAS TR2 BA | RBF | FT TR 230/69 kV BARREIRAS TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | TR 230/69 kV BARREIRAS TR1 BA | RBF | FT TR 230/69 kV BARREIRAS TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | TR 230/69 kV BARREIRAS TR1 BA | RBF | FT TR 230/69 kV BARREIRAS TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | TR 230/69 kV BARREIRAS TR1 BA | RBF | FT TR 230/69 kV BARREIRAS TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$913,997.96 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | TR 230/69 kV BARREIRAS TR1 BA | RBF | FT TR 230/69 kV BARREIRAS TR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/20/2021 | 5/28/2056 | R$90,080.95 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BARREIRAS | TR 230/138 kV BARREIRAS TRR1 BA | RBF | FT TR 230/138 kV BARREIRAS TRR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$192,171.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | TR 230/138 kV BARREIRAS TR5 BA | RBF | FT TR 230/138 kV BARREIRAS TR5 BA | 061/2001 | IPCA | RBNIA | REA 14143/2023 | R$ 2,500,533.98 | 6/1/2025 | Prevista | T2023-080 | Instalar, na SE BARREIRAS, de uma transformação trifásica TR3 230/138-13,8 KV - 100 MVA. | ||||
| AXIA Energia Nordeste | BARREIRAS | TR 230/138 kV BARREIRAS TR4 BA | RBF | FT TR 230/138 kV BARREIRAS TR4 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,822.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | TR 230/138 kV BARREIRAS TR3 BA | RBF | FT TR 230/138 kV BARREIRAS TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,822.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | TR 230/138 kV BARREIRAS TR3 BA | RBF | FT TR 230/138 kV BARREIRAS TR3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/15/2022 | 11/22/2057 | R$ 372.25 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BARREIRAS | RTB 230 kV 10 Mvar BARREIRAS RT2 BA | RB | FT RTB 230 kV 10 Mvar BARREIRAS RT2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$163,799.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | RTB 230 kV 10 Mvar BARREIRAS RT2 BA | RB | FT RTB 230 kV 10 Mvar BARREIRAS RT2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$459,650.17 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | RTB 230 kV 10 Mvar BARREIRAS RT2 BA | RB | FT RTB 230 kV 10 Mvar BARREIRAS RT2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$423,741.30 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | RTB 230 kV 10 Mvar BARREIRAS RT2 BA | RB | FT RTB 230 kV 10 Mvar BARREIRAS RT2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/12/2021 | 11/21/2057 | R$1,463.17 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BARREIRAS | MG 230 kV BARREIRAS MG1 BA | RB | FT MG 230 kV BARREIRAS MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$600,178.20 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | MG 230 kV BARREIRAS MG1 BA | RB | FT MG 230 kV BARREIRAS MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 2/14/2014 | 2/13/2031 | R$19,974.15 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCOS DE BATERIAS -48Vcc Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BARREIRAS | MG 230 kV BARREIRAS MG1 BA | RB | FT MG 230 kV BARREIRAS MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/20/2013 | 12/19/2028 | R$17,348.18 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SISTEMA DE AMPLIFICAÇÃO ÓPTICO Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BARREIRAS | MG 230 kV BARREIRAS MG1 BA | RB | FT MG 230 kV BARREIRAS MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/9/2015 | 12/8/2032 | R$17,502.13 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição das Bateriais Saturnia 60PZS400 125Vcc, Posições 800A1 e 800A2 .Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BARREIRAS | MG 230 kV BARREIRAS MG1 BA | RB | FT MG 230 kV BARREIRAS MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 3/31/2015 | 3/30/2043 | R$42,361.79 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DO CONCENTRADOR DE DADOS PARA ATENDIMENTO AO AUMENTO DA OBSERVABILIDADE ASSOCIADA AO PROCEDIMENTO DE REDE 2.7..Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BARREIRAS | MG 230 kV BARREIRAS MG1 BA | RB | FT MG 230 kV BARREIRAS MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,684,201.44 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | MG 230 kV BARREIRAS MG1 BA | RB | FT MG 230 kV BARREIRAS MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,552,627.95 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | MG 230 kV BARREIRAS MG1 BA | RB | FT MG 230 kV BARREIRAS MG1 BA | 061/2001 | IPCA | RBNIA | REA 14143/2023 | R$176,829.10 | 6/1/2025 | Prevista | T2023-080 | Complemento do Módulo Geral da SE Barreiras, setor de 230 kV, para instalação do 3° transformador 230/38 kV, 100 MVA. | 4T25 | |||
| AXIA Energia Nordeste | BARREIRAS | MG 230 kV BARREIRAS MG1 BA | RB | FT MG 230 kV BARREIRAS MG1 BA | 061/2001 | IPCA | RBNIA | REA 14143/2023 | R$113,101.20 | 6/1/2025 | Prevista | T2023-080 | Complemento do Módulo Geral da SE Barreiras, setor de 138 kV, para instalação do 3° transformador 230/38 kV, 100 MVA. | 4T25 | |||
| AXIA Energia Nordeste | BARREIRAS | MG 230 kV BARREIRAS MG1 BA | RB | FT MG 230 kV BARREIRAS MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/16/2019 | 6/17/2040 | R$126,204.04 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BARREIRAS | MC 69 kV TT 69/13,8 kV BARREIRAS TA1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BARREIRAS | MC 69 kV TR 69/13,8 kV BARREIRAS TR1 BA | RB | FT MG 230 kV BARREIRAS MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | MC 69 kV TR 230/69 kV BARREIRAS TR2 BA | RBF | FT TR 230/69 kV BARREIRAS TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | MC 69 kV TR 230/69 kV BARREIRAS TR1 BA | RBF | FT TR 230/69 kV BARREIRAS TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | MC 69 kV TR 230/69 kV BARREIRAS TR1 BA | RBF | FT TR 230/69 kV BARREIRAS TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | MC 69 kV TR 230/69 kV BARREIRAS TR1 BA | RBF | FT TR 230/69 kV BARREIRAS TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$162,185.50 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | MC 69 kV TR 230/69 kV BARREIRAS TR1 BA | RBF | FT TR 230/69 kV BARREIRAS TR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/5/2020 | 1/7/2050 | R$32,299.36 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BARREIRAS | MC 230 kV TR 230/69 kV BARREIRAS TR2 BA | RBF | FT TR 230/69 kV BARREIRAS TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | MC 230 kV TR 230/69 kV BARREIRAS TR1 BA | RBF | FT TR 230/69 kV BARREIRAS TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | MC 230 kV TR 230/69 kV BARREIRAS TR1 BA | RBF | FT TR 230/69 kV BARREIRAS TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$410,719.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | MC 230 kV TR 230/69 kV BARREIRAS TR1 BA | RBF | FT TR 230/69 kV BARREIRAS TR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/5/2020 | 1/7/2050 | R$20,770.12 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BARREIRAS | MC 230 kV TR 230/138 kV BARREIRAS TR5 BA | RBF | FT TR 230/138 kV BARREIRAS TR5 BA | 061/2001 | IPCA | RBNIA | REA 14143/2023 | R$ 1,692,977.56 | 6/1/2025 | Prevista | T2023-080 | Instalar, na SE BARREIRAS, um módulo de conexão, em 230 kV, para o transformador trifásico TR3 230/138 kV - 100 MVA, arranjo Barra Principal e Transferência. | ||||
| AXIA Energia Nordeste | BARREIRAS | MC 230 kV TR 230/138 kV BARREIRAS TR4 BA | RBF | FT TR 230/138 kV BARREIRAS TR4 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | MC 230 kV TR 230/138 kV BARREIRAS TR3 BA | RBF | FT TR 230/138 kV BARREIRAS TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | MC 230 kV TR 230/138 kV BARREIRAS TR3 BA | RBF | FT TR 230/138 kV BARREIRAS TR3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/30/2021 | 7/29/2045 | R$5,971.50 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BARREIRAS | MC 230 kV RTB 230 kV 10 Mvar BARREIRAS RT2 BA | RB | FT RTB 230 kV 10 Mvar BARREIRAS RT2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$91,861.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | MC 230 kV RTB 230 kV 10 Mvar BARREIRAS RT2 BA | RB | FT RTB 230 kV 10 Mvar BARREIRAS RT2 BA | 061/2001 | IPCA | RBNI | REA 5824/2016 | 10/12/2018 | 1/10/2045 | R$150,673.57 | 6/1/2025 | Ativa | T2015-076 | Complemento do módulo de manobra associado ao banco de reatores de linha da LT 230 kV B. J. Lapa I – Barreiras I remanejado para a para Barra na subestação Barreiras I. RAP alterada pela REA xxxx/2017 - Pedido de Reconsideração. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BARREIRAS | MC 230 kV RTB 230 kV 10 Mvar BARREIRAS RT2 BA | RB | FT RTB 230 kV 10 Mvar BARREIRAS RT2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/27/2021 | 7/26/2045 | R$25,382.44 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BARREIRAS | MC 138 kV TR 230/138 kV BARREIRAS TR5 BA | RBF | FT TR 230/138 kV BARREIRAS TR5 BA | 061/2001 | IPCA | RBNIA | REA 14143/2023 | R$ 1,298,822.21 | 6/1/2025 | Prevista | T2023-080 | Instalar, na SE BARREIRAS, um módulo de conexão, em 138 kV, para o transformador trifásico TR3 230/138 kV - 100 MVA, arranjo Barra Principal e Transferência. | ||||
| AXIA Energia Nordeste | BARREIRAS | MC 138 kV TR 230/138 kV BARREIRAS TR4 BA | RBF | FT TR 230/138 kV BARREIRAS TR4 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$112,381.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | MC 138 kV TR 230/138 kV BARREIRAS TR3 BA | RBF | FT TR 230/138 kV BARREIRAS TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$112,381.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | MC 138 kV TR 230/138 kV BARREIRAS TR3 BA | RBF | FT TR 230/138 kV BARREIRAS TR3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/14/2020 | 9/17/2050 | R$42,417.39 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BARREIRAS | IB 69 kV MG 230 kV BARREIRAS MG1 BA IB3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BARREIRAS | IB 230 kV MG 230 kV BARREIRAS MG1 BA IB1 | RB | FT MG 230 kV BARREIRAS MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,837.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | IB 230 kV MG 230 kV BARREIRAS MG1 BA IB1 | RB | FT MG 230 kV BARREIRAS MG1 BA | 061/2001 | IPCA | RBNI | REA 5824/2016 | 11/14/2018 | 11/13/2051 | R$175,157.20 | 6/1/2025 | Ativa | T2015-076 | Substituição do disjuntor do módulo de interligação de barras em 230 kV, associado ao banco de reatores de linha da LT 230 kV B. J. Lapa I – Barreiras I remanejado para a para Barra na subestação Barreiras I. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BARREIRAS | IB 138 kV MG 230 kV BARREIRAS MG1 BA IB2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$86,825.51 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BARREIRAS | IB 138 kV MG 230 kV BARREIRAS MG1 BA IB2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/1/2019 | 3/3/2049 | R$1,599.59 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BARREIRAS | EL 69 kV BARREIRAS DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BARREIRAS | EL 69 kV BARREIRAS DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BARREIRAS | EL 69 kV BARREIRAS DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BARREIRAS | EL 69 kV BARREIRAS DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BARREIRAS | EL 69 kV BARREIRAS DIST3 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/3/2022 | 11/2/2055 | R$51,316.85 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BARREIRAS | EL 69 kV BARREIRAS DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BARREIRAS | EL 69 kV BARREIRAS DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BARREIRAS | EL 69 kV BARREIRAS DIST1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/24/2022 | 4/23/2046 | R$8,088.62 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BARREIRAS | EL 230 kV BARREIRAS LT 230 kV BARREIRAS II /BARREIRAS C-1 BA | RB | FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | EL 230 kV BARREIRAS LT 230 kV BARREIRAS II /BARREIRAS C-1 BA | RB | FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$596,907.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | EL 230 kV BARREIRAS LT 230 kV BARREIRAS II /BARREIRAS C-1 BA | RB | FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$550,275.38 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS | EL 230 kV BARREIRAS LT 230 kV BARREIRAS II /BARREIRAS C-1 BA | RB | FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA | 061/2001 | IPCA | RBNI | REA 5861/2016 | 4/19/2014 | 4/18/2042 | R$31,520.42 | 6/1/2025 | Ativa | Substituição de sistemas de proteção e painéis associados em 01 terminal de linha de transmissão LT 04L1 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BARREIRAS | EL 230 kV BARREIRAS LT 230 kV BARREIRAS II /BARREIRAS C-1 BA | RB | FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/5/2019 | 12/7/2049 | R$22,973.63 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BARREIRAS | EL 138 kV BARREIRAS DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$167,571.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BARREIRAS | EL 138 kV BARREIRAS DIST2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/26/2020 | 4/25/2049 | R$6,535.80 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BARREIRAS | EL 138 kV BARREIRAS DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$167,571.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BARREIRAS | EL 138 kV BARREIRAS DIST1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/22/2016 | 12/23/2048 | R$39,751.52 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BARREIRAS II | RTL 230 kV 3,33 Mvar BARREIRAS II RTR1 BA | RB | FT RTL 230 kV 3,33 Mvar BARREIRAS II RTR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$54,539.90 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS II | RTL 230 kV 3,33 Mvar BARREIRAS II RTR1 BA | RB | FT RTL 230 kV 3,33 Mvar BARREIRAS II RTR1 BA | 061/2001 | IPCA | RBNI | REA 5824/2016 | 6/11/2019 | 7/6/2047 | R$34,069.14 | 6/1/2025 | Ativa | T2015-076 | Remanejamento de fase reserva do banco de reatores de linha da LT 230 kV B. J. Lapa I – Barreiras I, instalado na extremidade da SE Barreiras I, para outra extremidade após secionamento na subestação Barreiras II. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BARREIRAS II | RTL 230 kV 3,33 Mvar BARREIRAS II RTR1 BA | RB | FT RTL 230 kV 3,33 Mvar BARREIRAS II RTR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$153,048.17 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS II | RTL 230 kV 3,33 Mvar BARREIRAS II RTR1 BA | RB | FT RTL 230 kV 3,33 Mvar BARREIRAS II RTR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$141,091.71 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS II | RTL 230 kV 10 Mvar BARREIRAS II RT1 BA | RB | FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$163,799.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS II | RTL 230 kV 10 Mvar BARREIRAS II RT1 BA | RB | FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA | 061/2001 | IPCA | RBNI | REA 5824/2016 | 6/11/2019 | 6/16/2047 | R$37,981.73 | 6/1/2025 | Ativa | T2015-076 | Remanejamento de um banco de reatores de linha da LT 230 kV B. J. Lapa I – Barreiras I, instalado na extremidade da SE Barreiras I, para outra extremidade após secionamento na subestação Barreiras II *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BARREIRAS II | RTL 230 kV 10 Mvar BARREIRAS II RT1 BA | RB | FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$459,650.17 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS II | RTL 230 kV 10 Mvar BARREIRAS II RT1 BA | RB | FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$423,741.30 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS II | RTL 230 kV 10 Mvar BARREIRAS II RT1 BA | RB | FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/12/2021 | 11/21/2057 | R$1,457.22 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BARREIRAS II | MG 230 kV BARREIRAS II MG2 BA | RB | FT MG 230 kV BARREIRAS II MG2 BA | 061/2001 | IPCA | RBNI | REA 5824/2016 | 6/11/2019 | 12/8/2038 | R$190,275.66 | 6/1/2025 | Ativa | T2015-076 | Instalação de módulo de infraestrutura geral para acessante em 230 kV, associado ao remanejamento de um banco de reatores de linha em 230 kV. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BARREIRAS II | MG 230 kV BARREIRAS II MG2 BA | RB | FT MG 230 kV BARREIRAS II MG2 BA | 061/2001 | IPCA | RBNI | REA 5824/2016 | 6/11/2019 | 2/11/2047 | R$19,948.69 | 6/1/2025 | Ativa | T2015-076 | Instalação do módulo de infraestrutura de manobra associado ao banco de reatores de linha remanejado da subestação Barreiras I para a subestação Barreiras II. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BARREIRAS II | MG 230 kV BARREIRAS II MG2 BA | RB | FT MG 230 kV BARREIRAS II MG2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/24/2022 | 5/23/2045 | R$61,651.82 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BARREIRAS II | MC 230 kV RTL 230 kV 10 Mvar BARREIRAS II RT1 BA | RB | FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$91,861.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS II | MC 230 kV RTL 230 kV 10 Mvar BARREIRAS II RT1 BA | RB | FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA | 061/2001 | IPCA | RBNI | REA 5824/2016 | 6/11/2019 | 12/5/2039 | R$58,887.17 | 6/1/2025 | Ativa | T2015-076 | Complemento do módulo de manobra associado ao banco de reatores de linha remanejado da subestação Barreiras I para a subestação Barreiras II. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BARREIRAS II | MC 230 kV RTL 230 kV 10 Mvar BARREIRAS II RT1 BA | RB | FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$257,778.53 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BARREIRAS II | EL 230 kV BARREIRAS II LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA | RB | FT LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA | 061/2001 | IPCA | RBNI | REA 9680/2021 | 11/19/2019 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Barreiras II, associada à linha de transmissão 230 kV Barreiras II - Tabocas Brejo Velho (considerando que o trecho de LT 230 kV Barreiras II – Bom jesus da Lapa foi seccionado na SE Tabocas do Brejo velho). *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BARREIRAS II | EL 230 kV BARREIRAS II LT 230 kV BARREIRAS II /BARREIRAS C-1 BA | RB | FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA | 061/2001 | IPCA | RBNI | REA 9680/2021 | 11/19/2019 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Barreiras II, associada à linha de transmissão 230 kV Barreiras – Barreiras II. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BARREIRO 1 | MG 345 kV BARREIRO 1 MG2 MG | RB | FT MG 345 kV BARREIRO 1 MG2 MG | 062/2001 | IPCA | RBNI | REA 8565/2020 | 1/2/2024 | 1/1/2057 | R$60,041.37 | 6/1/2025 | Ativa | T2019-065 | Complementação do Módulo Geral da SE Barreiro 1 em função da adequação da EL 345 kV para Pimenta (345 kV - BDDD) | ||
| AXIA Energia | BARREIRO 1 | EL 345 kV BARREIRO 1 LT 345 kV BARREIRO 1 /SARZEDO C-1 MG | RB | FT LT 345 kV BARREIRO 1 /SARZEDO C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,201.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARREIRO 1 | EL 345 kV BARREIRO 1 LT 345 kV BARREIRO 1 /SARZEDO C-1 MG | RB | FT LT 345 kV BARREIRO 1 /SARZEDO C-1 MG | 062/2001 | IPCA | RBNI | REA 8565/2020 | 1/2/2024 | 1/1/2052 | R$881,428.33 | 6/1/2025 | Ativa | T2019-065 | Adequação, na SE Barreiro 1, da entrada de linha para a SE Pimenta (345KV - BDDD.) | ||
| AXIA Energia | BARRO ALTO | TT 13,8/0,12 kV BARRO ALTO TR3 GO | RBF | FT TR 230/69 kV BARRO ALTO TR3 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | TT 13,8/0,12 kV BARRO ALTO TR2 GO | RBF | FT TR 230/69 kV BARRO ALTO TR2 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | TT 13,8/0,12 kV BARRO ALTO TR1 GO | RBF | FT TR 230/69 kV BARRO ALTO TR1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | TR 230/69 kV BARRO ALTO TRR1 GO | RBF | FT TR 230/69 kV BARRO ALTO TRR1 GO | 062/2001 | IPCA | RMEL | REA 11449/2022 | 5/2/2022 | 9/19/2056 | R$872,877.13 | 6/1/2025 | Ativa | T2022-015 | Obra de Substituição Completa - Substituir na SE Barro Alto o transformador monofásico reserva - TRR1 - 230/69 kV - 1x17 MVA por outro de 1x17 MVA. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BARRO ALTO | TR 230/69 kV BARRO ALTO TR3 GO | RBF | FT TR 230/69 kV BARRO ALTO TR3 GO | 062/2001 | IPCA | RBNI | REA 4276/2013 | 11/22/2016 | 12/17/2048 | R$ 1,234,849.82 | 6/1/2025 | Ativa | T2013-041 | Instalação, na subestação Barro Alto, de um banco de autotransformadores monofásicos 230/69 kV, de 3 x 16,6 MVA. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BARRO ALTO | TR 230/69 kV BARRO ALTO TR2 GO | RBF | FT TR 230/69 kV BARRO ALTO TR2 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$364,881.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | TR 230/69 kV BARRO ALTO TR1 GO | RBF | FT TR 230/69 kV BARRO ALTO TR1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$364,881.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | TR 230/69 kV BARRO ALTO TR1 GO | RBF | FT TR 230/69 kV BARRO ALTO TR1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,400,188.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | TR 230/69 kV BARRO ALTO TR1 GO | RBF | FT TR 230/69 kV BARRO ALTO TR1 GO | 062/2001 | IPCA | RMELP | DSP 1108/2024 | R$ 2,667,148.49 | 6/1/2025 | Prevista | T2024-101 | Obra de Substituição Completa: Substituição do banco de transformadores TR01 230/69 kV, 3x16,67 MVA, fases A, B e C, na SE BARRO ALTO. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia | BARRO ALTO | RTB 230 kV 15 Mvar BARRO ALTO RT1 GO | RB | FT RTB 230 kV 15 Mvar BARRO ALTO RT1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$196,861.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | RTB 230 kV 15 Mvar BARRO ALTO RT1 GO | RB | FT RTB 230 kV 15 Mvar BARRO ALTO RT1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$755,432.95 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | MG 230 kV BARRO ALTO MG1 GO | RB | FT MG 230 kV BARRO ALTO MG1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$526,838.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | MG 230 kV BARRO ALTO MG1 GO | RB | FT MG 230 kV BARRO ALTO MG1 GO | 062/2001 | IPCA | RBNI | REA 4276/2013 | 11/22/2016 | 1/6/2046 | R$219,974.33 | 6/1/2025 | Ativa | T2013-041 | Complementação do módulo geral da subestação Barro Alto com um módulo de infraestrutura de manobra em 230 kV e um módulo de infraestrutura de manobra em 69 kV, ambos em arranjo barra dupla a quatro chaves. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BARRO ALTO | MG 230 kV BARRO ALTO MG1 GO | RB | FT MG 230 kV BARRO ALTO MG1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,021,676.68 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | MG 230 kV BARRO ALTO MG1 GO | RB | FT MG 230 kV BARRO ALTO MG1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,167,345.62 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | MG 230 kV BARRO ALTO MG1 GO | RB | FT MG 230 kV BARRO ALTO MG1 GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/8/2017 | 2/2/2033 | R$12,402.54 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BARRO ALTO | MG 230 kV BARRO ALTO MG1 GO | RB | FT MG 230 kV BARRO ALTO MG1 GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/8/2017 | 2/2/2033 | R$11,191.96 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BARRO ALTO | MG 230 kV BARRO ALTO MG1 GO | RB | FT MG 230 kV BARRO ALTO MG1 GO | 062/2001 | IPCA | RBNI | REA 5861/2016 | 11/28/2017 | 12/20/2045 | R$26,785.18 | 6/1/2025 | Ativa | Implantação do SEP de Alívio de Carga da LT 230 kV Brasília Sul - Águas Lindas e da LT 230 kV Barro Alto - Águas Lindas * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BARRO ALTO | MG 230 kV BARRO ALTO MG1 GO | RB | FT MG 230 kV BARRO ALTO MG1 GO | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/27/2015 | 11/26/2030 | R$163,792.68 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BARRO ALTO | MC 69 kV TR 230/69 kV BARRO ALTO TR3 GO | RBF | FT TR 230/69 kV BARRO ALTO TR3 GO | 062/2001 | IPCA | RBNI | REA 4276/2013 | 11/22/2016 | 10/25/2047 | R$441,991.01 | 6/1/2025 | Ativa | T2013-041 | Instalação, na subestação Barro Alto, de um módulo de conexão de transformador em 69 kV, arranjo barra dupla a quatro chaves. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BARRO ALTO | MC 69 kV TR 230/69 kV BARRO ALTO TR2 GO | RBF | FT TR 230/69 kV BARRO ALTO TR2 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,644.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | MC 69 kV TR 230/69 kV BARRO ALTO TR1 GO | RBF | FT TR 230/69 kV BARRO ALTO TR1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,644.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | MC 69 kV TR 230/69 kV BARRO ALTO TR1 GO | RBF | FT TR 230/69 kV BARRO ALTO TR1 GO | 062/2001 | IPCA | RMEL | REN 643/2014 | 10/18/2015 | 10/17/2043 | R$44,422.28 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 4 seccionadoras s/LTC PMI 2014-2017 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BARRO ALTO | MC 69 kV TR 230/69 kV BARRO ALTO TR1 GO | RBF | FT TR 230/69 kV BARRO ALTO TR1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$244,226.24 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | MC 230 kV TR 230/69 kV BARRO ALTO TR3 GO | RBF | FT TR 230/69 kV BARRO ALTO TR3 GO | 062/2001 | IPCA | RBNI | REA 4276/2013 | 11/22/2016 | 8/23/2047 | R$979,293.30 | 6/1/2025 | Ativa | T2013-041 | Instalação, na subestação Barro Alto, de um módulo de conexão de transformador em 230 kV, arranjo barra dupla a quatro chaves. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BARRO ALTO | MC 230 kV TR 230/69 kV BARRO ALTO TR2 GO | RBF | FT TR 230/69 kV BARRO ALTO TR2 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,686.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | MC 230 kV TR 230/69 kV BARRO ALTO TR1 GO | RBF | FT TR 230/69 kV BARRO ALTO TR1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,686.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | MC 230 kV TR 230/69 kV BARRO ALTO TR1 GO | RBF | FT TR 230/69 kV BARRO ALTO TR1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$562,889.91 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | MC 230 kV TR 230/69 kV BARRO ALTO TR1 GO | RBF | FT TR 230/69 kV BARRO ALTO TR1 GO | 062/2001 | IPCA | RMEL | REN 643/2014 | 1/31/2016 | 4/23/2044 | R$108,815.91 | 6/1/2025 | Ativa | Substituição de 4 seccionadoras (SC717, SC711, SC713 E SC719) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BARRO ALTO | MC 230 kV RTB 230 kV 15 Mvar BARRO ALTO RT1 GO | RB | FT RTB 230 kV 15 Mvar BARRO ALTO RT1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$141,058.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | MC 230 kV RTB 230 kV 15 Mvar BARRO ALTO RT1 GO | RB | FT RTB 230 kV 15 Mvar BARRO ALTO RT1 GO | 062/2001 | IPCA | RMEL | REN 643/2014 | 12/6/2015 | 1/28/2044 | R$101,733.50 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 4 seccionadoras s/LTC PMI 2014-2017 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BARRO ALTO | MC 230 kV RTB 230 kV 15 Mvar BARRO ALTO RT1 GO | RB | FT RTB 230 kV 15 Mvar BARRO ALTO RT1 GO | 062/2001 | IPCA | RMEL | REN 643/2014 | 6/27/2016 | 2/5/2048 | R$145,342.60 | 6/1/2025 | Ativa | Substituição de 1 disjuntor (DJ7118R - vão Reator RT01) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BARRO ALTO | MC 230 kV BC 230 kV 27,7 Mvar BARRO ALTO BC2 GO | RB | FT BC 230 kV 27,7 Mvar BARRO ALTO BC2 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$150,459.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | MC 230 kV BC 230 kV 27 Mvar BARRO ALTO BC1 GO | RB | FT BC 230 kV 27 Mvar BARRO ALTO BC1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$150,459.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | MC 13,8 kV TT 13,8/0,12 kV BARRO ALTO TR3 GO | RBF | FT TR 230/69 kV BARRO ALTO TR3 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | MC 13,8 kV TT 13,8/0,12 kV BARRO ALTO TR2 GO | RBF | FT TR 230/69 kV BARRO ALTO TR2 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | MC 13,8 kV TT 13,8/0,12 kV BARRO ALTO TR1 GO | RBF | FT TR 230/69 kV BARRO ALTO TR1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | IB 69 kV MG 230 kV BARRO ALTO MG1 GO IB1 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$40,216.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | BARRO ALTO | IB 69 kV MG 230 kV BARRO ALTO MG1 GO IB1 | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$154,324.26 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | BARRO ALTO | IB 69 kV MG 230 kV BARRO ALTO MG1 GO IB1 | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 5/24/2015 | 12/15/2042 | R$10,880.07 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 1 seccionadora (SC501 - vão de amarre) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BARRO ALTO | IB 69 kV MG 230 kV BARRO ALTO MG1 GO IB1 | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 5/31/2015 | 12/22/2042 | R$10,887.76 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 1 seccionadora (SC503 - vão de amarre) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BARRO ALTO | IB 230 kV MG 230 kV BARRO ALTO MG1 GO IB1 | RB | FT MG 230 kV BARRO ALTO MG1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$127,017.00 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | IB 230 kV MG 230 kV BARRO ALTO MG1 GO IB1 | RB | FT MG 230 kV BARRO ALTO MG1 GO | 062/2001 | IPCA | RMEL | REN 643/2014 | 11/1/2015 | 10/31/2043 | R$27,668.71 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 1 seccionadora (SC701 - vão de amarre) PMI 2014-2017 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BARRO ALTO | IB 230 kV MG 230 kV BARRO ALTO MG1 GO IB1 | RB | FT MG 230 kV BARRO ALTO MG1 GO | 062/2001 | IPCA | RMEL | REN 643/2014 | 11/22/2015 | 12/14/2043 | R$27,726.50 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 1 seccionadora (SC703 - vão de amarre) PMI 2014-2017 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BARRO ALTO | IB 230 kV MG 230 kV BARRO ALTO MG1 GO IB1 | RB | FT MG 230 kV BARRO ALTO MG1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$487,412.14 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | EL 69 kV BARRO ALTO DIST3 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,760.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | BARRO ALTO | EL 69 kV BARRO ALTO DIST3 | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 10/4/2015 | 10/3/2043 | R$43,656.71 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 3 seccionadoras s/LTC e 1 seccionadora c/LTC PMI 2014-2017 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BARRO ALTO | EL 69 kV BARRO ALTO DIST3 | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$283,047.13 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | BARRO ALTO | EL 69 kV BARRO ALTO DIST2 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,760.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | BARRO ALTO | EL 69 kV BARRO ALTO DIST2 | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 10/11/2015 | 10/10/2043 | R$43,686.71 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 3 seccionadoras s/LTC e 1 seccionadora c/LTC PMI 2014-2017 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BARRO ALTO | EL 69 kV BARRO ALTO DIST2 | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$283,047.13 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | BARRO ALTO | EL 69 kV BARRO ALTO DIST1 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,760.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | BARRO ALTO | EL 69 kV BARRO ALTO DIST1 | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 9/20/2015 | 8/13/2043 | R$29,394.30 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 3 seccionadoras s/LTC Incluida no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BARRO ALTO | EL 69 kV BARRO ALTO DIST1 | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 9/20/2015 | 8/13/2043 | R$14,200.14 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 1 seccionadora c/LTC Incluida no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BARRO ALTO | EL 69 kV BARRO ALTO DIST1 | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$283,047.13 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | BARRO ALTO | EL 230 kV BARRO ALTO LT 230 kV ITAPACI /BARRO ALTO C-1 GO | RB | FT LT 230 kV ITAPACI /BARRO ALTO C-1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$208,406.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | EL 230 kV BARRO ALTO LT 230 kV ITAPACI /BARRO ALTO C-1 GO | RB | FT LT 230 kV ITAPACI /BARRO ALTO C-1 GO | 062/2001 | IPCA | RBNI | REA 3218/2011 | 2/1/2015 | 5/26/2040 | R$31,524.35 | 6/1/2025 | Ativa | Instalação de proteção de linha na entrada de linha em 230 kV associada à linha de transmissão Itapaci – Barro Alto (Proteção LT 230 kV Itapeci C1) Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BARRO ALTO | EL 230 kV BARRO ALTO LT 230 kV ITAPACI /BARRO ALTO C-1 GO | RB | FT LT 230 kV ITAPACI /BARRO ALTO C-1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$799,734.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | EL 230 kV BARRO ALTO LT 230 kV ITAPACI /BARRO ALTO C-1 GO | RB | FT LT 230 kV ITAPACI /BARRO ALTO C-1 GO | 062/2001 | IPCA | RMEL | REN 643/2014 | 5/29/2016 | 12/20/2044 | R$37,979.03 | 6/1/2025 | Ativa | Substituição de 1 seccionadora (SC7537/7530T - EL Itapaci) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BARRO ALTO | EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /NIQUELANDIA C-2 GO | RB | FT LT 230 kV BARRO ALTO /NIQUELANDIA C-2 GO | 028/2009 | IPCA | RBL | CC 028/2009 | 7/1/2016 | 11/19/2039 | R$709,523.62 | 6/1/2025 | Ativa | T2009-241-B | Contrato de Concessão nº 028/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia | BARRO ALTO | EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO | RB | FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$208,406.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO | RB | FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$799,734.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO | RB | FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO | 062/2001 | IPCA | RMEL | REN 643/2014 | 7/3/2016 | 3/26/2045 | R$78,870.41 | 6/1/2025 | Ativa | Substituição de 3 seccionadoraS (SC7529, SC7521 E SC7523) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BARRO ALTO | EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO | RB | FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO | 062/2001 | IPCA | RBNI | REA 3578/2012 | 5/6/2016 | 11/27/2044 | R$34,652.94 | 6/1/2025 | Ativa | Substituição de 1 seccionadora com lâminas de terra correspondente ao vão para Niquelândia do primeiro circuito da LT 230 kV Niquelândia - Barro Alto * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BARRO ALTO | EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO | RB | FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO | 062/2001 | IPCA | RBNI | REA 2367/2010 | 11/24/2013 | 12/17/2037 | R$22,878.35 | 6/1/2025 | Ativa | T2009-133 | Adequar, na SE Barro Alto, o sistema de proteção do módulo de entrada de linha 230 kV, arranjo barra dupla a quatro chaves para a LT 230 kV Brasília Sul - Águas Lindas, resultante do seccionamento da LT 230 kV Brasília Sul - Barro Alto. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BARRO ALTO | EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO | RB | FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$208,406.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO | RB | FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$799,734.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO | RB | FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO | 062/2001 | IPCA | RMEL | REN 643/2014 | 4/17/2016 | 10/9/2044 | R$26,102.33 | 6/1/2025 | Ativa | Substituição de 1 seccionadora (SC7511 - EL Águas Lindas) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BARRO ALTO | EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO | RB | FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO | 062/2001 | IPCA | RMEL | REN 643/2014 | 6/16/2016 | 2/6/2045 | R$52,498.37 | 6/1/2025 | Ativa | Substituição de 2 seccionadoraS (SC7519 E SC7513) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BARRO ALTO | EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO | RB | FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO | 062/2001 | IPCA | RMEL | REN 643/2014 | 4/21/2016 | 10/13/2044 | R$37,843.77 | 6/1/2025 | Ativa | Substituição de 1 seccionadora (SC7517/7510T - EL Águas Lindas) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BARRO ALTO | BC 230 kV 27,7 Mvar BARRO ALTO BC2 GO | RB | FT BC 230 kV 27,7 Mvar BARRO ALTO BC2 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$136,251.41 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO ALTO | BC 230 kV 27,7 Mvar BARRO ALTO BC2 GO | RB | FT BC 230 kV 27,7 Mvar BARRO ALTO BC2 GO | 062/2001 | IPCA | RBNI | DSP 1107/2021 | 9/10/2016 | 9/9/2049 | R$215,597.44 | 6/1/2025 | Ativa | DISJUNTOR - BC 230 kV BARRO ALTO BC02 GO. Regularização de extrapatrimonial nos termos do Despacho nº 1.107/2021 Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BARRO ALTO | BC 230 kV 27 Mvar BARRO ALTO BC1 GO | RB | FT BC 230 kV 27 Mvar BARRO ALTO BC1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$134,263.51 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BARRO BRANCO | MG 345 kV BARRO BRANCO MG1 MG | RB | FT MG 345 kV BARRO BRANCO MG1 MG | 062/2001 | IPCA | RBNI | REA 8920/2020 | 9/1/2017 | 12/31/2042 | R$46,092.50 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de um módulo de infraestrutura geral para acessante incluindo terreno, 345 kV, DJM. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BARRO BRANCO | MG 345 kV BARRO BRANCO MG1 MG | RB | FT MG 345 kV BARRO BRANCO MG1 MG | 062/2001 | IPCA | RBNI | REA 8920/2020 | 9/1/2017 | 12/31/2042 | R$92,340.50 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de dois módulos de infraestrutura, 345 kV, DJM. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BARRO BRANCO | IB 345 kV MG 345 kV BARRO BRANCO MG1 MG IB1 | RB | FT MG 345 kV BARRO BRANCO MG1 MG | 062/2001 | IPCA | RBNI | REA 8920/2020 | 9/1/2017 | 12/31/2042 | R$139,992.23 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de uma interligação de barramentos em 345 kV associada ao seccionamento da LT 345 kV Ouro Preto 2 - Padre Fialho. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BARRO BRANCO | EL 345 kV BARRO BRANCO LT 345 kV PADRE FIALHO /BARRO BRANCO C-1 MG | RB | FT LT 345 kV PADRE FIALHO /BARRO BRANCO C-1 MG | 062/2001 | IPCA | RBNI | REA 8920/2020 | 9/1/2017 | 12/31/2042 | R$128,892.74 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 345 kV, arranjo disjuntor e meio, na Subestação Barro Branco, associada ao seccionamento da LT 345 kV Outro Preto 2 - Padre Fialho. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BARRO BRANCO | EL 345 kV BARRO BRANCO LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG | RB | FT LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG | 062/2001 | IPCA | RBNI | REA 8920/2020 | 9/1/2017 | 12/31/2042 | R$128,892.74 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 345 kV, arranjo disjuntor e meio, na Subestação Barro Branco, associada ao seccionamento da LT 345 kV Outro Preto 2 - Padre Fialho. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BATEIAS | RTL 500 kV 165 Mvar BATEIAS RT4 PR | RB | FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 3,522,245.18 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | BATEIAS | RTL 500 kV 165 Mvar BATEIAS RT3 PR | RB | FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 3,522,245.18 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | BATEIAS | MC 500 kV RTL 500 kV 165 Mvar BATEIAS RT4 PR | RB | FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 1,254,437.60 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | BATEIAS | MC 500 kV RTL 500 kV 165 Mvar BATEIAS RT3 PR | RB | FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 1,254,437.60 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | BATEIAS | IB 500 kV MG 500 kV BATEIAS MG5 PR IB7 | RB | FT MG 500 kV BATEIAS MG5 PR | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 2,781,322.20 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | BATEIAS | EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-2 SP/PR | RB | FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 2,781,322.20 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | BATEIAS | EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-2 SP/PR | RB | FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR | 034/2001 | IGPM | RBNI | REA 8314/2019 | 2/11/2021 | 2/4/2036 | R$11,685.06 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000443/2014 (FT: LT 500 kV IBIUNA /BATEIAS C 2 SP/PR) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 27/06/2024) | |||
| AXIA Energia | BATEIAS | EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-2 SP/PR | RB | FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR | 034/2001 | IGPM | RBNI | REA 5861/2016 | 2/10/2021 | 2/3/2036 | R$4,867.17 | 6/1/2025 | Ativa | LT 500kV Ibiúna - Bateias C2 - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 27/06/2024) | |||
| AXIA Energia | BATEIAS | EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-2 SP/PR | RB | FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR | 034/2001 | IGPM | RBNI | REA 8314/2019 | 2/10/2021 | 2/3/2036 | R$8,652.75 | 6/1/2025 | Ativa | Implantação de Unidade de Medição Fasorial – PMU e sistema de comunicação associado adicional para transmissão das medidas para o ONS, na barra da subestação.* Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 27/06/2024) | |||
| AXIA Energia | BATEIAS | EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-1 SP/PR | RB | FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 2,781,322.20 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | BATEIAS | EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-1 SP/PR | RB | FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR | 034/2001 | IGPM | RMEL | REN 443/2011 | 12/31/2017 | 1/2/2048 | R$2,728.87 | 6/1/2025 | Ativa | Substituição dos Servidores do Sistema de Supervisão e Controle Local (SAGE) por obsolescência ou por atualização tecnológica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | |||
| AXIA Energia | BATEIAS | EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-1 SP/PR | RB | FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR | 034/2001 | IGPM | RBNI | REA 8314/2019 | 2/11/2021 | 2/4/2036 | R$9,560.52 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000395/2014 (FT:LT 500 kV IBIUNA / BATEIAS C 1 SP/PR) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 27/06/2024) | |||
| AXIA Energia | BATEIAS | EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-1 SP/PR | RB | FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR | 034/2001 | IGPM | RBNI | REA 5861/2016 | 2/10/2021 | 2/3/2036 | R$4,867.17 | 6/1/2025 | Ativa | LT 500kV Ibiúna - Bateias C1 - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 27/06/2024) | |||
| AXIA Energia | BATEIAS | EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-1 SP/PR | RB | FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR | 034/2001 | IGPM | RBNI | REA 8314/2019 | 2/10/2021 | 2/3/2036 | R$8,652.75 | 6/1/2025 | Ativa | Implantação de Unidade de Medição Fasorial – PMU e sistema de comunicação associado adicional para transmissão das medidas para o ONS, na barra da subestação. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Sul | BIGUACU | TR 525/230 kV BIGUACU TR3 SC | RB | FT TR 525/230 kV BIGUACU TR3 SC | 010/2005 | IGPM | RBNI | REA 4802/2014 | 2/19/2017 | 2/18/2052 | R$ 7,132,708.02 | 6/1/2025 | Ativa | T2014-056 | Instalação, na Subestação Biguaçu, de um banco de autotransformadores 525/230 kV, de 3 x 224 MVA. *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Sul | BIGUACU | TR 500/230 kV BIGUACU TRR1 SC | RB | FT TR 500/230 kV BIGUACU TRR1 SC | 010/2005 | IGPM | RBNI | REA 485/2006 | 7/5/2008 | 7/4/2043 | R$ 3,749,594.34 | 6/1/2025 | Ativa | Instalar, na SE Biguaçu, uma unidade de autotransformador reserva TRR1 525/230/13,8 kV - 224 MVA para o banco de autotransformadores TR1 de 525/230/13,8 kV - 3x224 MVA. *(Receita revisada em 16/06/2010) * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Sul | BIGUACU | TR 500/230 kV BIGUACU TR2 SC | RB | FT TR 500/230 kV BIGUACU TR2 SC | 010/2005 | IGPM | RBNI | REA 2383/2010 | 3/1/2012 | 2/28/2047 | R$ 9,980,438.58 | 6/1/2025 | Ativa | T2009-073 | Instalar o 2º banco de autotransformadores monofásicos em 525/230 kV com 672 MVA. * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Sul | BIGUACU | TR 500/230 kV BIGUACU TR1 SC | RB | FT TR 500/230 kV BIGUACU TR1 SC | 010/2005 | IGPM | RBNI | REA 485/2006 | 7/5/2008 | 7/4/2043 | R$ 11,248,783.02 | 6/1/2025 | Ativa | Instalar, na SE Biguaçu, um banco de autotransformadores TR1 de 525/230/13,8 kV - 3x224 MVA. *(Receita revisada em 16/06/2010) * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Sul | BIGUACU | TR 230/138 kV BIGUACU TR3 SC | RBF | FT TR 230/138 kV BIGUACU TR3 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$377,367.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BIGUACU | TR 230/138 kV BIGUACU TR2 SC | RBF | FT TR 230/138 kV BIGUACU TR2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$377,367.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BIGUACU | TR 230/138 kV BIGUACU TF8 SC | RBF | FT TR 230/138 kV BIGUACU TF8 SC | 057/2001 | IPCA | RBNI | REA 4618/2014 | 4/15/2016 | 11/24/2050 | R$ 1,611,131.75 | 6/1/2025 | Ativa | T2014-013 | Instalar, na SE Biguaçu, o 4º autotransformador 230/138 kV, com potência de 150 MVA. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | BIGUACU | TR 230/138 kV BIGUACU TF7 SC | RBF | FT TR 230/138 kV BIGUACU TF7 SC | 057/2001 | IPCA | RBNI | REA 2589/2010 | 11/12/2012 | 6/23/2047 | R$ 1,478,217.44 | 6/1/2025 | Ativa | T2010-036 | Instalar, na SE Biguaçu, o terceiro autotransformador trifásico (ATF7) 230/138/13,8 kV - 150 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | BIGUACU | RTL 500 kV 150 Mvar BIGUACU RT2 SC | RB | FT RTL 500 kV 150 Mvar BIGUACU RT2 SC | 010/2005 | IGPM | RBL | CC 010/2005 | 9/17/2006 | 3/4/2035 | R$ 1,901,172.77 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2005 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | BIGUACU | RTB 525 kV 150 Mvar BIGUACU RT2 SC | RB | FT RTB 525 kV 150 Mvar BIGUACU RT2 SC | 010/2005 | IGPM | RBNI | REA 5239/2015 | 5/25/2017 | 5/24/2053 | R$ 3,034,838.59 | 6/1/2025 | Ativa | T2015-027 | Instalação de Banco de Reatores de Barra 525 kV, 3x50 Mvar na Subestação Biguaçu *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Sul | BIGUACU | RTB 500 kV 50 Mvar BIGUACU RTR1 SC | RB | FT RTB 500 kV 50 Mvar BIGUACU RTR1 SC | 010/2005 | IGPM | RBNI | REA 5239/2015 | 5/25/2017 | 5/24/2053 | R$ 1,011,612.86 | 6/1/2025 | Ativa | T2015-027 | Instalação de Reator Reserva 50 Mvar - 525kV na Subestação Biguaçu *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Sul | BIGUACU | RTB 500 kV 150 Mvar BIGUACU RT1 SC | RB | FT RTB 500 kV 150 Mvar BIGUACU RT1 SC | 010/2005 | IGPM | RBNI | REA 485/2006 | 5/25/2008 | 5/24/2044 | R$ 4,500,027.95 | 6/1/2025 | Ativa | Instalar, na SE Biguaçu, um banco de reatores de barra RT1 525 kV - 3x50 MVAr. *(Receita revisada em 16/06/2010) * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Sul | BIGUACU | MG 500 kV BIGUACU MG1 SC | RB | FT MG 500 kV BIGUACU MG1 SC | 010/2005 | IGPM | RBNI | REA 485/2006 | 5/25/2008 | 5/24/2032 | R$ 7,500,516.43 | 6/1/2025 | Ativa | Instalar, na SE Biguaçu, um módulo geral de porte médio MG2, em 525 kV, arranjo disjuntor e meio. *(Receita revisada em 16/06/2010) * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Sul | BIGUACU | MG 500 kV BIGUACU MG1 SC | RB | FT MG 500 kV BIGUACU MG1 SC | 010/2005 | IGPM | RBNI | REA 485/2006 | 5/25/2008 | 5/24/2032 | R$207,967.27 | 6/1/2025 | Ativa | Construção de bases, paredes corta-fogo e bacias de captação para a montagem dosreatores de linha remanejados da SE Blumenau para a nova SE Biguaçu. *(Receita revisada em 16/06/2010) * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Sul | BIGUACU | MG 500 kV BIGUACU MG1 SC | RB | FT MG 500 kV BIGUACU MG1 SC | 010/2005 | IGPM | RBNI | REA 2383/2010 | 3/1/2012 | 2/28/2037 | R$83,131.51 | 6/1/2025 | Ativa | T2009-073 | Complementação de infraestrutura de módulo geral pela instalação do 2° banco de autotransformadores monofásicos 525/230kV-13,8 kV, de 3x224 MVA, cada. * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Sul | BIGUACU | MG 500 kV BIGUACU MG1 SC | RB | FT MG 500 kV BIGUACU MG1 SC | 010/2005 | IGPM | RBNI | REA 4802/2014 | 2/19/2017 | 2/18/2046 | R$242,502.66 | 6/1/2025 | Ativa | T2014-056 | Complementação do módulo geral da Subestação Biguaçu com um módulo de infraestrutura de manobra 230 kV. *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Sul | BIGUACU | MG 500 kV BIGUACU MG1 SC | RB | FT MG 500 kV BIGUACU MG1 SC | 010/2005 | IGPM | RBNI | REA 5239/2015 | 5/25/2017 | 5/24/2047 | R$894,725.36 | 6/1/2025 | Ativa | T2015-027 | Complementação do módulo geral da Subestação Biguaçu com um módulo de infraestrutura de manobra 525 kV. *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Sul | BIGUACU | MG 230 kV BIGUACU MG1 SC | RB | FT MG 230 kV BIGUACU MG1 SC | 057/2001 | IPCA | RBNI | REA 2589/2010 | 11/12/2012 | 9/7/2041 | R$274,729.13 | 6/1/2025 | Ativa | T2010-036 | Complementar, na SE Biguaçu, o módulo geral para instalar o terceiro autotransformador trifásico (ATF7) 230/138/13,8 kV - 150 MVA e respectivos módulos de conexão em 230 kV e em 69 kV. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | BIGUACU | MG 230 kV BIGUACU MG1 SC | RB | FT MG 230 kV BIGUACU MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$502,065.06 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BIGUACU | MG 230 kV BIGUACU MG1 SC | RB | FT MG 230 kV BIGUACU MG1 SC | 057/2001 | IPCA | RBNI | REA 4618/2014 | 4/15/2016 | 3/19/2045 | R$185,295.13 | 6/1/2025 | Ativa | T2014-013 | Complemento do módulo geral da subestação Biguaçu (MG1) com um módulo de infraestrutura de manobra 230 kV, arranjo barra dupla a 4 chaves. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | BIGUACU | MG 230 kV BIGUACU MG1 SC | RB | FT MG 230 kV BIGUACU MG1 SC | 057/2001 | IPCA | RBNI | REA 4618/2014 | 4/15/2016 | 12/10/2044 | R$117,466.46 | 6/1/2025 | Ativa | T2014-013 | Complemento do módulo geral da subestação Biguaçu (MG1) com um módulo de infraestrutura de manobra 138 kV, arranjo barra dupla a 4 chaves. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | BIGUACU | MG 230 kV BIGUACU MG1 SC | RB | FT MG 230 kV BIGUACU MG1 SC | 057/2001 | IPCA | RBNI | REA 6090/2016 | 9/28/2018 | 7/27/2048 | R$210,760.12 | 6/1/2025 | Ativa | T2016-072 | Instalar Módulo de Infraestrutura de Manobra referente ao Módulo Conexão de Banco de Capacitores Derivação 230 kV, arranjo BD4. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | BIGUACU | MG 230 kV BIGUACU MG1 SC | RB | FT MG 230 kV BIGUACU MG1 SC | 057/2001 | IPCA | RBNI | REA 5861/2016 | 10/11/2018 | 10/10/2035 | R$21,275.16 | 6/1/2025 | Ativa | Instalação de 2 carregadores de baterias de 48 Vcc. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | BIGUACU | MG 230 kV BIGUACU MG1 SC | RB | FT MG 230 kV BIGUACU MG1 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 2/1/2021 | 11/16/2036 | R$20,894.43 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | BIGUACU | MC 525 kV TR 525/230 kV BIGUACU TR3 SC | RB | FT TR 525/230 kV BIGUACU TR3 SC | 010/2005 | IGPM | RBNI | REA 4802/2014 | 2/19/2017 | 2/18/2048 | R$ 2,690,177.92 | 6/1/2025 | Ativa | T2014-056 | Instalação, na Subestação Biguaçu, de um módulo de conexão de transformador em 500 kV, arranjo disjuntor e meio. *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Sul | BIGUACU | MC 525 kV RTB 525 kV 150 Mvar BIGUACU RT2 SC | RB | FT RTB 525 kV 150 Mvar BIGUACU RT2 SC | 010/2005 | IGPM | RBNI | REA 5239/2015 | 5/25/2017 | 5/24/2048 | R$ 1,793,316.20 | 6/1/2025 | Ativa | T2015-027 | Instalação de Módulo de Manobra - Conexão de Reator de Barra (525kV - DJM) na Subestação Biguaçu *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Sul | BIGUACU | MC 500 kV TR 500/230 kV BIGUACU TRR1 SC | RB | FT TR 500/230 kV BIGUACU TRR1 SC | 010/2005 | IGPM | RBNI | REA 2383/2010 | 3/1/2012 | 2/29/2040 | R$98,924.02 | 6/1/2025 | Ativa | T2009-073 | Instalar, na SE Biguaçu, um módulo de conexão em 525 kV, para a fase reserva do TR 525/230 kV BIGUACU TRR1 SC, constituído por duas chaves seccionadoras tripolares. * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Sul | BIGUACU | MC 500 kV TR 500/230 kV BIGUACU TR2 SC | RB | FT TR 500/230 kV BIGUACU TR2 SC | 010/2005 | IGPM | RBNI | REA 2383/2010 | 3/1/2012 | 2/29/2040 | R$ 2,258,777.28 | 6/1/2025 | Ativa | T2009-073 | Instalar uma conexão de transformador em 525 kV para o TR2 * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Sul | BIGUACU | MC 500 kV TR 500/230 kV BIGUACU TR1 SC | RB | FT TR 500/230 kV BIGUACU TR1 SC | 010/2005 | IGPM | RBNI | REA 485/2006 | 7/5/2008 | 7/4/2036 | R$ 2,520,988.26 | 6/1/2025 | Ativa | Instalar, na SE Biguaçu, um módulo de conexão, em 525 kV, para o banco de autotransformadores TR1 de 525/230/13,8 kV - 3x224 MVA. *(Receita revisada em 16/06/2010) * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Sul | BIGUACU | MC 500 kV RTL 500 kV 150 Mvar BIGUACU RT2 SC | RB | FT RTL 500 kV 150 Mvar BIGUACU RT2 SC | 010/2005 | IGPM | RBL | CC 010/2005 | 9/17/2006 | 3/4/2035 | R$645,917.84 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2005 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | BIGUACU | MC 500 kV RTB 500 kV 150 Mvar BIGUACU RT1 SC | RB | FT RTB 500 kV 150 Mvar BIGUACU RT1 SC | 010/2005 | IGPM | RBNI | REA 485/2006 | 5/25/2008 | 5/24/2036 | R$ 2,522,854.00 | 6/1/2025 | Ativa | Instalar, na SE Biguaçu, um módulo de conexão, em 525 kV, para o banco de reatores de barra RT1 525 kV - 3x50 MVAr. *(Receita revisada em 16/06/2010) * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Sul | BIGUACU | MC 230 kV TR 525/230 kV BIGUACU TR3 SC | RB | FT TR 525/230 kV BIGUACU TR3 SC | 010/2005 | IGPM | RBNI | REA 4802/2014 | 2/19/2017 | 2/18/2048 | R$ 1,659,540.17 | 6/1/2025 | Ativa | T2014-056 | Instalação, na Subestação Biguaçu, de um módulo de conexão de transformador em 230 kV, arranjo barra dupla a quatro chaves. *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Sul | BIGUACU | MC 230 kV TR 500/230 kV BIGUACU TRR1 SC | RB | FT TR 500/230 kV BIGUACU TRR1 SC | 010/2005 | IGPM | RBNI | REA 2383/2010 | 3/1/2012 | 2/28/2035 | R$41,300.42 | 6/1/2025 | Ativa | T2009-073 | Instalar, na SE Biguaçu, um módulo de conexão em 230 kV, para a fase reserva do TR 525/230 kV BIGUACU TRR1 SC, constituído por duas chaves seccionadoras tripolares. * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Sul | BIGUACU | MC 230 kV TR 500/230 kV BIGUACU TR2 SC | RB | FT TR 500/230 kV BIGUACU TR2 SC | 010/2005 | IGPM | RBNI | REA 2383/2010 | 3/1/2012 | 2/28/2035 | R$885,984.51 | 6/1/2025 | Ativa | T2009-073 | Instalar uma conexão de transformador em 230 kV para o TR2 * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Sul | BIGUACU | MC 230 kV TR 500/230 kV BIGUACU TR1 SC | RB | FT TR 500/230 kV BIGUACU TR1 SC | 010/2005 | IGPM | RBNI | REA 485/2006 | 7/5/2008 | 7/4/2031 | R$987,814.32 | 6/1/2025 | Ativa | Instalar, na SE Biguaçu, um módulo de conexão, em 230 kV, para o banco de autotransformadores TR1 de 525/230/13,8 kV - 3x224 MVA. *(Receita revisada em 16/06/2010) * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Sul | BIGUACU | MC 230 kV TR 230/138 kV BIGUACU TR3 SC | RBF | FT TR 230/138 kV BIGUACU TR3 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BIGUACU | MC 230 kV TR 230/138 kV BIGUACU TR2 SC | RBF | FT TR 230/138 kV BIGUACU TR2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BIGUACU | MC 230 kV TR 230/138 kV BIGUACU TF8 SC | RBF | FT TR 230/138 kV BIGUACU TF8 SC | 057/2001 | IPCA | RBNI | REA 4618/2014 | 4/15/2016 | 9/19/2046 | R$ 1,044,404.80 | 6/1/2025 | Ativa | T2014-013 | Instalar, na SE Biguaçu, um módulo de conexão 230 kV, arranjo barra dupla a quatro chaves, para o quarto autotransformador trifásico 230/138 kV, de 150 MVA. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | BIGUACU | MC 230 kV TR 230/138 kV BIGUACU TF7 SC | RBF | FT TR 230/138 kV BIGUACU TF7 SC | 057/2001 | IPCA | RBNI | REA 2589/2010 | 11/12/2012 | 4/18/2043 | R$946,438.61 | 6/1/2025 | Ativa | T2010-036 | Instalar, na SE Biguaçu, um módulo de conexão, em 230 kV, arranjo barra principal e transferência, para o terceiro autotransformador trifásico (ATF7) 230/138/13,8 kV - 150 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | BIGUACU | MC 230 kV BC 230 kV 100 Mvar BIGUACU BC1 SC | RB | FT BC 230 kV 100 Mvar BIGUACU BC1 SC | 057/2001 | IPCA | RBNI | REA 6090/2016 | 9/28/2018 | 12/1/2049 | R$ 1,610,846.03 | 6/1/2025 | Ativa | T2016-072 | Instalar Módulo de Conexão de Banco de Capacitores Derivação 230 kV, arranjo BD4. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | BIGUACU | MC 138 kV TR 230/138 kV BIGUACU TR3 SC | RBF | FT TR 230/138 kV BIGUACU TR3 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$100,865.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BIGUACU | MC 138 kV TR 230/138 kV BIGUACU TR2 SC | RBF | FT TR 230/138 kV BIGUACU TR2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$100,865.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BIGUACU | MC 138 kV TR 230/138 kV BIGUACU TF8 SC | RBF | FT TR 230/138 kV BIGUACU TF8 SC | 057/2001 | IPCA | RBNI | REA 4618/2014 | 4/15/2016 | 4/14/2046 | R$ 1,101,582.67 | 6/1/2025 | Ativa | T2014-013 | Instalar, na SE Biguaçu, um módulo de conexão 138 kV, arranjo barra dupla a quatro chaves, para o quarto autotransformador trifásico 230/138 kV, de 150 MVA. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | BIGUACU | MC 138 kV TR 230/138 kV BIGUACU TF7 SC | RBF | FT TR 230/138 kV BIGUACU TF7 SC | 057/2001 | IPCA | RBNI | REA 2589/2010 | 11/12/2012 | 11/11/2042 | R$996,722.54 | 6/1/2025 | Ativa | T2010-036 | Instalar, na SE Biguaçu, um módulo de conexão, em 138 kV, arranjo barra principal e transferência, para o terceiro autotransformador trifásico (ATF7) 230/138/13,8 kV - 150 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | BIGUACU | IB 525 kV MG 500 kV BIGUACU MG1 SC IB4 | RB | FT MG 500 kV BIGUACU MG1 SC | 010/2005 | IGPM | RBNI | REA 5239/2015 | 5/25/2017 | 5/24/2049 | R$ 2,207,689.82 | 6/1/2025 | Ativa | T2015-027 | Instalação, na SE BIGUACU, de uma interligação de barramentos IB4, em 525 kv, arranjo . *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Sul | BIGUACU | IB 500 kV MG 500 kV BIGUACU MG1 SC IB3 | RB | FT MG 500 kV BIGUACU MG1 SC | 010/2005 | IGPM | RBNI | REA 485/2006 | 5/25/2008 | 5/24/2039 | R$ 2,626,675.17 | 6/1/2025 | Ativa | Instalar, na SE Biguaçu, uma interligação de barramentos IB3, em 525 kV, arranjo disjuntor e meio. *(Receita revisada em 16/06/2010) * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Sul | BIGUACU | IB 500 kV MG 500 kV BIGUACU MG1 SC IB2 | RB | FT MG 500 kV BIGUACU MG1 SC | 010/2005 | IGPM | RBNI | REA 485/2006 | 5/25/2008 | 5/24/2039 | R$ 2,626,675.17 | 6/1/2025 | Ativa | Instalar, na SE Biguaçu, uma interligação de barramentos IB2, em 525 kV, arranjo disjuntor e meio. *(Receita revisada em 16/06/2010) * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Sul | BIGUACU | IB 500 kV MG 500 kV BIGUACU MG1 SC IB1 | RB | FT MG 500 kV BIGUACU MG1 SC | 010/2005 | IGPM | RBNI | REA 485/2006 | 5/25/2008 | 5/24/2039 | R$ 2,626,675.17 | 6/1/2025 | Ativa | Instalar, na SE Biguaçu, uma interligação de barramentos IB1, em 525 kV, arranjo disjuntor e meio. *(Receita revisada em 16/06/2010) * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Sul | BIGUACU | IB 230 kV MG 230 kV BIGUACU MG1 SC IB1 | RB | FT MG 230 kV BIGUACU MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,146.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BIGUACU | IB 138 kV MG 230 kV BIGUACU MG1 SC IB2 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,027.82 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | BIGUACU | EL 500 kV BIGUACU LT 500 kV BIGUACU /GASPAR 2 C-1 SC | RB | FT LT 500 kV BIGUACU /GASPAR 2 C-1 SC | 010/2005 | IGPM | RBNI | REA 485/2006 | 5/25/2008 | 5/24/2035 | R$ 2,863,556.90 | 6/1/2025 | Ativa | Instalar na SE BIGUACU um módulo de entrada de linha para o circuito LT 525 kV BLUMENAU /BIGUACU C-2 SC originado do seccionamento do circuito LT 525 kV BLUMENAU /C.NOVOS C-2 SC na SE BIGUACU *(Receita revisada em 16/06/2010) * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Sul | BIGUACU | EL 500 kV BIGUACU LT 500 kV BIGUACU /ABDON BATISTA C-1 SC | RB | FT LT 500 kV BIGUACU /ABDON BATISTA C-1 SC | 010/2005 | IGPM | RBNI | REA 485/2006 | 5/25/2008 | 5/24/2035 | R$ 2,863,556.90 | 6/1/2025 | Ativa | Instalar na SE BIGUACU um módulo de entrada de linha para o circuito LT 525 kV BIGUACU /C.NOVOS C-2 SC originado do seccionamento do circuito LT 525 kV BLUMENAU /C.NOVOS C-2 SC na SE BIGUACU *(Receita revisada em 16/06/2010) * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Sul | BIGUACU | EL 230 kV BIGUACU LT 230 kV BIGUACU /PALHOCA ESU C-1 SC | RB | FT LT 230 kV BIGUACU /PALHOCA ESU C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BIGUACU | EL 230 kV BIGUACU LT 230 kV BIGUACU /J.LACERDA-B C-1 SC | RB | FT LT 230 kV BIGUACU /J.LACERDA-B C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BIGUACU | EL 230 kV BIGUACU LT 230 kV BIGUACU /GASPAR 2 C-1 SC | RB | FT LT 230 kV BIGUACU /GASPAR 2 C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BIGUACU | EL 230 kV BIGUACU LT 230 kV BIGUACU /DESTERRO C-1 SC | RB | FT LT 230 kV BIGUACU /DESTERRO C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BIGUACU | EL 138 kV BIGUACU TIJUC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$149,126.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | BIGUACU | EL 138 kV BIGUACU LT 138 kV BIGUACU /TIJUCAS C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$149,126.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | BIGUACU | EL 138 kV BIGUACU LT 138 kV BIGUACU /ITAJAIFAZENDA C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$149,126.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | BIGUACU | EL 138 kV BIGUACU LT 138 kV BIGUACU /FLORIANOPOLIS C-2 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$149,126.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | BIGUACU | EL 138 kV BIGUACU LT 138 kV BIGUACU /FLORIANOPOLIS C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$149,126.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | BIGUACU | EL 138 kV BIGUACU LT 138 kV BIGUACU /B.Q.BOCAIUVA C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$149,126.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | BIGUACU | BC 230 kV 100 Mvar BIGUACU BC1 SC | RB | FT BC 230 kV 100 Mvar BIGUACU BC1 SC | 057/2001 | IPCA | RBNI | REA 6090/2016 | 9/28/2018 | 10/1/2040 | R$498,378.36 | 6/1/2025 | Ativa | T2016-072 | Instalar Banco de Capacitores Derivação 230 kV - 100 Mvar. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | BLUMENAU | TR 500/230 kV BLUMENAU TR6 SC | RB | FT TR 500/230 kV BLUMENAU TR6 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,674,009.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | TR 500/230 kV BLUMENAU TR6 SC | RB | FT TR 500/230 kV BLUMENAU TR6 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,938,023.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | TR 500/230 kV BLUMENAU TR6 SC | RB | FT TR 500/230 kV BLUMENAU TR6 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,488,557.09 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | TR 500/230 kV BLUMENAU TR6 SC | RB | FT TR 500/230 kV BLUMENAU TR6 SC | 057/2001 | IPCA | RMELP | REA 13930/2023 | R$ 2,766,526.00 | 6/1/2025 | Prevista | T2023-030 | Obra de Substituição Parcial - Substituição de banco de autotransformadores monofásicos com comutador sob carga, TF6, 525/230 kV, 224 MVA - FASE C. SGPMR 1447/2022. | ||||
| AXIA Energia Sul | BLUMENAU | TR 500/230 kV BLUMENAU TR5 SC | RB | FT TR 500/230 kV BLUMENAU TR5 SC | 057/2001 | IPCA | RMEL | REA 10921/2021 | 11/25/2024 | 11/24/2059 | R$ 10,057,091.67 | 6/1/2025 | Ativa | T2021-108 | Obra de Substituição Completa - Substituir na SE Blumenau o transformador trifásico Fases A, B e C - TF5 - 525/230 kV - 672 MVA por outro de 672 MVA. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Sul | BLUMENAU | TR 230/138 kV BLUMENAU TR4 SC | RBF | FT TR 230/138 kV BLUMENAU TR4 SC | 057/2001 | IPCA | RMEL | REA 10921/2021 | 8/7/2023 | 8/6/2058 | R$ 2,939,368.55 | 6/1/2025 | Ativa | T2021-105 | Obra de Substituição Completa - Substituir na SE Blumenau o transformador trifásico - TF4 - 230/138 kV - 150 MVA por outro de 150 MVA. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Sul | BLUMENAU | TR 230/138 kV BLUMENAU TR3 SC | RBF | FT TR 230/138 kV BLUMENAU TR3 SC | 057/2001 | IPCA | RMEL | REA 10921/2021 | 8/20/2023 | 8/19/2058 | R$ 2,939,368.55 | 6/1/2025 | Ativa | T2021-104 | Obra de Substituição Completa - Substituir na SE Blumenau o transformador trifásico - TF3 - 230/138 kV - 150 MVA por outro de 150 MVA. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Sul | BLUMENAU | TR 230/138 kV BLUMENAU TR2 SC | RBF | FT TR 230/138 kV BLUMENAU TR2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$377,367.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | TR 230/138 kV BLUMENAU TR2 SC | RBF | FT TR 230/138 kV BLUMENAU TR2 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$662,310.72 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | TR 230/138 kV BLUMENAU TR2 SC | RBF | FT TR 230/138 kV BLUMENAU TR2 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$560,988.73 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | TR 230/138 kV BLUMENAU TR1 SC | RBF | FT TR 230/138 kV BLUMENAU TR1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$377,367.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | TR 230/138 kV BLUMENAU TR1 SC | RBF | FT TR 230/138 kV BLUMENAU TR1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$662,310.72 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | TR 230/138 kV BLUMENAU TR1 SC | RBF | FT TR 230/138 kV BLUMENAU TR1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$560,988.73 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | RTB 525 kV 150 Mvar BLUMENAU RT2 SC | RB | FT RTB 525 kV 150 Mvar BLUMENAU RT2 SC | 057/2001 | IPCA | RBNI | REA 7151/2018 | 6/5/2020 | 4/3/2054 | R$ 2,462,963.37 | 6/1/2025 | Ativa | T2018-022 | Instalação, na Subestação Blumenau, do 2° Banco de Reatores de Barras 525 kV - 150 MVA (3 x 50) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | BLUMENAU | RTB 500 kV 50 Mvar BLUMENAU RTR1 SC | RB | FT RTB 500 kV 50 Mvar BLUMENAU RTR1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$223,201.61 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | RTB 500 kV 50 Mvar BLUMENAU RTR1 SC | RB | FT RTB 500 kV 50 Mvar BLUMENAU RTR1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$391,737.16 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | RTB 500 kV 50 Mvar BLUMENAU RTR1 SC | RB | FT RTB 500 kV 50 Mvar BLUMENAU RTR1 SC | 057/2001 | IPCA | RBNI | REA 7151/2018 | 6/5/2020 | 6/4/2045 | R$20,783.23 | 6/1/2025 | Ativa | T2018-022 | Substituição, na Subestação Blumenau, do sistema de proteção contra incêndio da fase reserva do Banco de Reatores de Barras 525 kV - 50 MVA *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | BLUMENAU | RTB 500 kV 150 Mvar BLUMENAU RT1 SC | RB | FT RTB 500 kV 150 Mvar BLUMENAU RT1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$669,604.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | RTB 500 kV 150 Mvar BLUMENAU RT1 SC | RB | FT RTB 500 kV 150 Mvar BLUMENAU RT1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,175,211.47 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MG 500 kV BLUMENAU MG2 SC | RB | FT MG 500 kV BLUMENAU MG2 SC | 010/2005 | IGPM | RBL | CC 010/2005 | 9/17/2006 | 3/4/2035 | R$ 1,291,835.66 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2005 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | BLUMENAU | MG 500 kV BLUMENAU MG1 SC | RB | FT MG 500 kV BLUMENAU MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,406,505.41 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MG 500 kV BLUMENAU MG1 SC | RB | FT MG 500 kV BLUMENAU MG1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,468,532.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MG 500 kV BLUMENAU MG1 SC | RB | FT MG 500 kV BLUMENAU MG1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,090,890.08 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MG 500 kV BLUMENAU MG1 SC | RB | FT MG 500 kV BLUMENAU MG1 SC | 057/2001 | IPCA | RBNI | REA 7151/2018 | 6/5/2020 | 11/9/2046 | R$133,479.66 | 6/1/2025 | Ativa | T2018-022 | Complementação do MIG 500 kV da Subestação Blumenau para a instalação do 2° Banco de Reatores de Barras 525 kV - 150 MVA (3 x 50). *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | BLUMENAU | MG 500 kV BLUMENAU MG1 SC | RB | FT MG 500 kV BLUMENAU MG1 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 3/24/2020 | 4/29/2043 | R$382,348.85 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | BLUMENAU | MG 500 kV BLUMENAU MG1 SC | RB | FT MG 500 kV BLUMENAU MG1 SC | 057/2001 | IPCA | RBNI | DSP 4033/2021 | 10/31/2014 | 11/2/2044 | R$12,059.81 | 6/1/2025 | Ativa | Substituição de Transformadores de Potencial 13,8 kV, referentes aos Serviços Auxiliares da SE Blumenau, ramal proveniente do TF 3, Fases A, B, C. Associado à obra são esperadas substituições/adaptações de fundações, suportes, caixa de junção, cabos de controle/potência, barramento, conectores e conexão de aterramento.. Riscos de danos às instalações devido à perda de confiabilidade. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | BLUMENAU | MC 525 kV RTB 525 kV 150 Mvar BLUMENAU RT2 SC | RB | FT RTB 525 kV 150 Mvar BLUMENAU RT2 SC | 057/2001 | IPCA | RBNI | REA 7151/2018 | 6/5/2020 | 9/18/2049 | R$ 1,909,748.94 | 6/1/2025 | Ativa | T2018-022 | Instalação, na Subestação Blumanau, de uma conexão em 525 kV na configuração DJM para o 2° Banco de Reatores de Barras 525 kV - 150 MVA (3 x 50) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | BLUMENAU | MC 500 kV TR 500/230 kV BLUMENAU TR6 SC | RB | FT TR 500/230 kV BLUMENAU TR6 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$358,630.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MC 500 kV TR 500/230 kV BLUMENAU TR6 SC | RB | FT TR 500/230 kV BLUMENAU TR6 SC | 057/2001 | IPCA | RMEL | REN 643/2014 | 4/23/2015 | 4/22/2039 | R$38,579.57 | 6/1/2025 | Ativa | Substituição pararaios 525kV dos TF5 e TF6, no módulo ´MC 500 kV TR 500/230 kV BLUMENAU TR6 SC´. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | BLUMENAU | MC 500 kV TR 500/230 kV BLUMENAU TR6 SC | RB | FT TR 500/230 kV BLUMENAU TR6 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$629,425.18 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MC 500 kV TR 500/230 kV BLUMENAU TR6 SC | RB | FT TR 500/230 kV BLUMENAU TR6 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$533,134.11 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MC 500 kV TR 500/230 kV BLUMENAU TR6 SC | RB | FT TR 500/230 kV BLUMENAU TR6 SC | 057/2001 | IPCA | RMEL | REN 643/2014 | 9/14/2016 | 9/17/2046 | R$20,119.99 | 6/1/2025 | Ativa | Instalação de 1 TPC 525 kV no TF5 e 1 TPC 525 kV no TF6 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | BLUMENAU | MC 500 kV TR 500/230 kV BLUMENAU TR5 SC | RB | FT TR 500/230 kV BLUMENAU TR5 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$358,630.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MC 500 kV TR 500/230 kV BLUMENAU TR5 SC | RB | FT TR 500/230 kV BLUMENAU TR5 SC | 057/2001 | IPCA | RMEL | REN 643/2014 | 7/27/2014 | 7/26/2038 | R$37,358.34 | 6/1/2025 | Ativa | Substituição pararaios 525kV dos TF5 e TF6, no módulo ´MC 500 kV TR 500/230 kV BLUMENAU TR5 SC´. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | BLUMENAU | MC 500 kV TR 500/230 kV BLUMENAU TR5 SC | RB | FT TR 500/230 kV BLUMENAU TR5 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$629,425.18 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MC 500 kV TR 500/230 kV BLUMENAU TR5 SC | RB | FT TR 500/230 kV BLUMENAU TR5 SC | 057/2001 | IPCA | RMEL | REN 643/2014 | 9/14/2016 | 9/17/2046 | R$20,119.99 | 6/1/2025 | Ativa | Instalação de 1 TPC 525 kV no TF5 e 1 TPC 525 kV no TF6 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | BLUMENAU | MC 500 kV TR 500/230 kV BLUMENAU TR5 SC | RB | FT TR 500/230 kV BLUMENAU TR5 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 8/1/2018 | 7/31/2051 | R$220,217.75 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | BLUMENAU | MC 500 kV RTB 500 kV 150 Mvar BLUMENAU RT1 SC | RB | FT RTB 500 kV 150 Mvar BLUMENAU RT1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$335,783.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MC 500 kV RTB 500 kV 150 Mvar BLUMENAU RT1 SC | RB | FT RTB 500 kV 150 Mvar BLUMENAU RT1 SC | 057/2001 | IPCA | RMEL | REN 643/2014 | 8/22/2014 | 8/21/2038 | R$37,475.87 | 6/1/2025 | Ativa | Substituição dos para-raios 525 kV do reator 1. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | BLUMENAU | MC 500 kV RTB 500 kV 150 Mvar BLUMENAU RT1 SC | RB | FT RTB 500 kV 150 Mvar BLUMENAU RT1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$589,327.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MC 230 kV TR 500/230 kV BLUMENAU TR6 SC | RB | FT TR 500/230 kV BLUMENAU TR6 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$126,634.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MC 230 kV TR 500/230 kV BLUMENAU TR6 SC | RB | FT TR 500/230 kV BLUMENAU TR6 SC | 057/2001 | IPCA | RMEL | REN 643/2014 | 3/30/2014 | 3/29/2038 | R$17,709.55 | 6/1/2025 | Ativa | Substituição dos para-raios 230 kV de SiC dos TF6. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | BLUMENAU | MC 230 kV TR 500/230 kV BLUMENAU TR6 SC | RB | FT TR 500/230 kV BLUMENAU TR6 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$222,253.60 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MC 230 kV TR 500/230 kV BLUMENAU TR5 SC | RB | FT TR 500/230 kV BLUMENAU TR5 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$126,634.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MC 230 kV TR 500/230 kV BLUMENAU TR5 SC | RB | FT TR 500/230 kV BLUMENAU TR5 SC | 057/2001 | IPCA | RMEL | REN 643/2014 | 8/26/2014 | 8/25/2038 | R$18,033.49 | 6/1/2025 | Ativa | Substituição dos para-raios 230 kV de SiC dos TF5. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | BLUMENAU | MC 230 kV TR 500/230 kV BLUMENAU TR5 SC | RB | FT TR 500/230 kV BLUMENAU TR5 SC | 057/2001 | IPCA | RMEL | REN 643/2014 | 9/28/2014 | 9/30/2044 | R$12,153.84 | 6/1/2025 | Ativa | Aquisição e substituição da CS 895 (AVS 230 kV). Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | BLUMENAU | MC 230 kV TR 500/230 kV BLUMENAU TR5 SC | RB | FT TR 500/230 kV BLUMENAU TR5 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$222,253.60 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MC 230 kV TR 500/230 kV BLUMENAU TR5 SC | RB | FT TR 500/230 kV BLUMENAU TR5 SC | 057/2001 | IPCA | RBNI | DSP 1107/2021 | 2/1/2021 | 2/4/2051 | R$24,609.63 | 6/1/2025 | Ativa | TRANSFORMADOR DE CORRENTE DE 230 KV Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | BLUMENAU | MC 230 kV TR 230/138 kV BLUMENAU TR4 SC | RBF | FT TR 230/138 kV BLUMENAU TR4 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$126,634.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MC 230 kV TR 230/138 kV BLUMENAU TR4 SC | RBF | FT TR 230/138 kV BLUMENAU TR4 SC | 057/2001 | IPCA | RMEL | REN 643/2014 | 11/29/2013 | 11/28/2037 | R$17,446.13 | 6/1/2025 | Ativa | Substituição dos para-raios 230 kV de SiC do TFs 4.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | BLUMENAU | MC 230 kV TR 230/138 kV BLUMENAU TR4 SC | RBF | FT TR 230/138 kV BLUMENAU TR4 SC | 057/2001 | IPCA | RBNI | REA 3578/2012 | 8/24/2014 | 8/26/2044 | R$36,923.26 | 6/1/2025 | Ativa | Substituição de 3 TCs de 230kV do TF4.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | BLUMENAU | MC 230 kV TR 230/138 kV BLUMENAU TR3 SC | RBF | FT TR 230/138 kV BLUMENAU TR3 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$126,634.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MC 230 kV TR 230/138 kV BLUMENAU TR3 SC | RBF | FT TR 230/138 kV BLUMENAU TR3 SC | 057/2001 | IPCA | RBNI | REA 3578/2012 | 8/17/2014 | 8/19/2044 | R$36,898.71 | 6/1/2025 | Ativa | Substituição de 3 TCs de 230kV do TF3.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | BLUMENAU | MC 230 kV TR 230/138 kV BLUMENAU TR2 SC | RBF | FT TR 230/138 kV BLUMENAU TR2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$126,634.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MC 230 kV TR 230/138 kV BLUMENAU TR2 SC | RBF | FT TR 230/138 kV BLUMENAU TR2 SC | 057/2001 | IPCA | RMEL | REN 643/2014 | 11/25/2013 | 11/24/2037 | R$17,437.43 | 6/1/2025 | Ativa | Substituição dos para-raios 230 kV de SiC por ZnO do TF 2.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | BLUMENAU | MC 230 kV TR 230/138 kV BLUMENAU TR2 SC | RBF | FT TR 230/138 kV BLUMENAU TR2 SC | 057/2001 | IPCA | RBNI | REA 3578/2012 | 8/3/2014 | 8/5/2044 | R$36,849.61 | 6/1/2025 | Ativa | Substituição de 3 TCs de 230kV do TF2.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | BLUMENAU | MC 230 kV TR 230/138 kV BLUMENAU TR2 SC | RBF | FT TR 230/138 kV BLUMENAU TR2 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$222,253.60 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MC 230 kV TR 230/138 kV BLUMENAU TR1 SC | RBF | FT TR 230/138 kV BLUMENAU TR1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$126,634.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MC 230 kV TR 230/138 kV BLUMENAU TR1 SC | RBF | FT TR 230/138 kV BLUMENAU TR1 SC | 057/2001 | IPCA | RMEL | REN 643/2014 | 8/14/2013 | 8/13/2037 | R$17,213.50 | 6/1/2025 | Ativa | Substituição dos para-raios 230 kV de SiC por ZnO do TF 1. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | BLUMENAU | MC 230 kV TR 230/138 kV BLUMENAU TR1 SC | RBF | FT TR 230/138 kV BLUMENAU TR1 SC | 057/2001 | IPCA | RBNI | REA 3578/2012 | 7/26/2014 | 7/28/2044 | R$36,821.55 | 6/1/2025 | Ativa | Substituição de 3 TCs de 230kV do TF1. Incluída após Recurso em face da REH 1.918/2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | BLUMENAU | MC 230 kV TR 230/138 kV BLUMENAU TR1 SC | RBF | FT TR 230/138 kV BLUMENAU TR1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$222,253.60 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MC 230 kV BC 230 kV 125 Mvar BLUMENAU BC2 SC | RB | FT BC 230 kV 125 Mvar BLUMENAU BC2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$144,273.19 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MC 230 kV BC 230 kV 125 Mvar BLUMENAU BC1 SC | RB | FT BC 230 kV 125 Mvar BLUMENAU BC1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$144,273.19 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MC 138 kV TR 230/138 kV BLUMENAU TR4 SC | RBF | FT TR 230/138 kV BLUMENAU TR4 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$97,233.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MC 138 kV TR 230/138 kV BLUMENAU TR3 SC | RBF | FT TR 230/138 kV BLUMENAU TR3 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$97,233.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MC 138 kV TR 230/138 kV BLUMENAU TR2 SC | RBF | FT TR 230/138 kV BLUMENAU TR2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$97,233.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MC 138 kV TR 230/138 kV BLUMENAU TR2 SC | RBF | FT TR 230/138 kV BLUMENAU TR2 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$170,652.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MC 138 kV TR 230/138 kV BLUMENAU TR1 SC | RBF | FT TR 230/138 kV BLUMENAU TR1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$97,233.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | MC 138 kV TR 230/138 kV BLUMENAU TR1 SC | RBF | FT TR 230/138 kV BLUMENAU TR1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$170,652.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | IB 500 kV MG 500 kV BLUMENAU MG2 SC IB4 | RB | FT MG 500 kV BLUMENAU MG2 SC | 010/2005 | IGPM | RBL | CC 010/2005 | 9/17/2006 | 3/4/2035 | R$ 1,780,533.95 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2005 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | BLUMENAU | IB 500 kV MG 500 kV BLUMENAU MG1 SC IB3 | RB | FT MG 500 kV BLUMENAU MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | IB 500 kV MG 500 kV BLUMENAU MG1 SC IB2 | RB | FT MG 500 kV BLUMENAU MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | IB 500 kV MG 500 kV BLUMENAU MG1 SC IB1 | RB | FT MG 500 kV BLUMENAU MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | IB 230 kV MG 500 kV BLUMENAU MG1 SC IB2 | RB | FT MG 500 kV BLUMENAU MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$100,223.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | IB 230 kV MG 500 kV BLUMENAU MG1 SC IB1 | RB | FT MG 500 kV BLUMENAU MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$100,223.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | IB 138 kV MG 500 kV BLUMENAU MG1 SC IB1 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$75,121.98 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | BLUMENAU | EL 500 kV BLUMENAU LT 500 kV GASPAR 2 /BLUMENAU C-2 SC | RB | FT LT 500 kV GASPAR 2 /BLUMENAU C-2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | EL 500 kV BLUMENAU LT 500 kV GASPAR 2 /BLUMENAU C-1 SC | RB | FT LT 500 kV GASPAR 2 /BLUMENAU C-1 SC | 010/2005 | IGPM | RBL | CC 010/2005 | 9/17/2006 | 3/4/2035 | R$ 1,780,533.95 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2005 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | BLUMENAU | EL 500 kV BLUMENAU LT 500 kV GASPAR 2 /BLUMENAU C-1 SC | RB | FT LT 500 kV GASPAR 2 /BLUMENAU C-1 SC | 010/2005 | IGPM | RMEL | REN 643/2014 | 6/25/2014 | 6/24/2045 | R$2,637.34 | 6/1/2025 | Ativa | Substituição das flexitestes dos circuitos Curitiba e Biguaçu e dos TFs 5 e 6 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Sul | BLUMENAU | EL 230 kV BLUMENAU LT 230 kV GASPAR 2 /BLUMENAU C-2 SC | RB | FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | EL 230 kV BLUMENAU LT 230 kV GASPAR 2 /BLUMENAU C-2 SC | RB | FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC | 057/2001 | IPCA | RBNI | REA 2837/2011 | 8/2/2014 | 8/4/2044 | R$36,846.10 | 6/1/2025 | Ativa | Substituição de 3 TCs de 230kV do circuito Palhoça.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | BLUMENAU | EL 230 kV BLUMENAU LT 230 kV GASPAR 2 /BLUMENAU C-1 SC | RB | FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | EL 230 kV BLUMENAU LT 230 kV GASPAR 2 /BLUMENAU C-1 SC | RB | FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC | 057/2001 | IPCA | RMEL | REN 443/2011 | 11/9/2016 | 11/8/2040 | R$19,786.45 | 6/1/2025 | Ativa | Substituição dos para-raios de SiC pro ZnO do circuito GAS2 C1 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | BLUMENAU | EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINVILLE C-1 SC | RB | FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINVILLE C-1 SC | RB | FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC | 057/2001 | IPCA | RBNI | REA 3578/2012 | 8/30/2014 | 9/1/2044 | R$36,944.30 | 6/1/2025 | Ativa | Substituição de 3 TCs de 230kV do circuito Joinville. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | BLUMENAU | EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINVILLE C-1 SC | RB | FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC | 057/2001 | IPCA | RBNI | REA 7761/2019 | 4/30/2019 | 4/29/2049 | R$20,769.18 | 6/1/2025 | Ativa | Substituição de 3 Para-raios em Joinville (JOI). ZnO 192kV. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 | |||
| AXIA Energia Sul | BLUMENAU | EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC | RB | FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC | RB | FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC | 057/2001 | IPCA | RBNI | REA 3578/2012 | 8/23/2014 | 8/25/2044 | R$36,919.75 | 6/1/2025 | Ativa | Substituição de 3 TCs de 230kV do circuito Joinville Norte.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | BLUMENAU | EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC | RB | FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC | 057/2001 | IPCA | RBNI | REA 7761/2019 | 4/30/2019 | 4/29/2049 | R$20,769.18 | 6/1/2025 | Ativa | Substituição de 3 Para-raios em Joinville Norte (JNO) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 | |||
| AXIA Energia Sul | BLUMENAU | EL 230 kV BLUMENAU LT 230 kV BLUMENAU /ITAJAI C-2 SC | RB | FT LT 230 kV BLUMENAU /ITAJAI C-2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | EL 230 kV BLUMENAU LT 230 kV BLUMENAU /ITAJAI C-1 SC | RB | FT LT 230 kV BLUMENAU /ITAJAI C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | BLUMENAU | EL 138 kV BLUMENAU LT 138 kV BLUMENAU 2 /BLUMENAU C-2 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$144,984.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | BLUMENAU | EL 138 kV BLUMENAU LT 138 kV BLUMENAU 2 /BLUMENAU C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$144,984.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | BLUMENAU | EL 138 kV BLUMENAU LT 138 kV BLUMENAU /ILHOTA C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$144,984.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | BLUMENAU | EL 138 kV BLUMENAU LT 138 kV BLUMENAU /GASPAR C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$144,984.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | BLUMENAU | EL 138 kV BLUMENAU LT 138 kV BLUMENAU /GASPAR C-1 SC | DIT | 057/2001 | IPCA | RCDM | REA 7761/2019 | 8/18/2021 | 8/17/2051 | R$24,442.60 | 6/1/2025 | Ativa | Substituição de 3 Transformador de Corrente(s) no vão LT Gaspar(TC642) na SE BLU * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 | ||||
| AXIA Energia Sul | BLUMENAU | BC 230 kV 125 Mvar BLUMENAU BC2 SC | RB | FT BC 230 kV 125 Mvar BLUMENAU BC2 SC | 057/2001 | IPCA | RMEL | REA 10921/2021 | 10/25/2024 | 10/24/2045 | R$654,012.76 | 6/1/2025 | Ativa | T2021-107 | Obra de Substituição Completa - Substituir na SE Blumenau o banco de capacitor - BC2 - 230 kV - 125 MVAr por outro de 125 MVAr. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Sul | BLUMENAU | BC 230 kV 125 Mvar BLUMENAU BC1 SC | RB | FT BC 230 kV 125 Mvar BLUMENAU BC1 SC | 057/2001 | IPCA | RMEL | REA 10921/2021 | 9/29/2024 | 9/28/2045 | R$654,012.76 | 6/1/2025 | Ativa | T2021-106 | Obra de Substituição Completa - Substituir na SE Blumenau o banco de capacitor - BC1 - 230 kV - 125 MVAr por outro de 125 MVAr. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Norte | BOA VISTA | TT 13,8/0 kV BOA VISTA TT2 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$11,917.48 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Transformador de Aterramento 13,8kV, 1,52 MVAr, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | TT 13,8/0 kV BOA VISTA TT1 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$11,917.48 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Transformadore de Aterramento 13,8kV, 1,52 MVAr, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | TR 230/69 kV BOA VISTA TR3 RR | DIT | 058/2001 | IPCA | RCDM | DSP 3687/2017 | 7/5/2015 | 4/15/2050 | R$ 1,984,971.49 | 6/1/2025 | Ativa | T2019-081 | Instalar, na SE BOA VISTA, de uma transformação trifásica TR3 230/69-13,8 KV - 100 MVA. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | BOA VISTA | TR 230/69 kV BOA VISTA TR2 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$330,950.37 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção do Transformador TR2 230/69 kV, 100 MVA, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | TR 230/69 kV BOA VISTA TR1 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$330,950.37 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção do Transformador TR1 230/69 kV, 100 MVA, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | RTL 230 kV 25 Mvar BOA VISTA RTLR1 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$134,437.99 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Reator reserva 230 kV, 25 MVAr, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | RTL 230 kV 25 Mvar BOA VISTA RTL1 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$134,437.99 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Reator de Linha 230 kV, 25 MVAr, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | MG 230 kV BOA VISTA MG2 RR | DIT | 058/2001 | IPCA | RCDM | REA 3587/2012 | 6/1/2016 | 7/27/2044 | R$451,501.87 | 6/1/2025 | Ativa | T2012-058 | Complementação do MG 230 kV da SE Boa Vista referente à adequação da SE aos Procedimentos de Rede, devido à interligação Manaus - Boa Vista, incluindo um módulo de infraestrutura referente à Interligação de Barras IB1 230 kV. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | BOA VISTA | MG 230 kV BOA VISTA MG2 RR | DIT | 058/2001 | IPCA | RCDM | DSP 3687/2017 | 7/5/2015 | 5/16/2043 | R$199,432.01 | 6/1/2025 | Ativa | T2019-081 | Complementação do MG 230 kV da SE Boa Vista referente à instalação do 3º transformador trifásico 230/69/13,8 kV - 100 MVA, incluindo um módulo de infraestrutura de manobra referente ao módulo de conexão 69 kV. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | BOA VISTA | MG 230 kV BOA VISTA MG2 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$268,436.61 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Módulo Geral 230 kV, arranjo barra dupla a quatro chaves, na SE Boa Vista. Incorporado ao Contrato 58/2001. | ||||
| AXIA Energia Norte | BOA VISTA | MG 230 kV BOA VISTA MG2 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$91,693.87 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 4 Módulos de Infraestrutura de Manobra 230 kV, arranjo barra dupla a quatro chaves, na SE Boa Vista incorporados ao Contrato n° 58/2001. | ||||
| AXIA Energia Norte | BOA VISTA | MG 230 kV BOA VISTA MG2 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$26,697.75 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Módulo Geral 69 kV, arranjo barra principal e transferência, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | MG 230 kV BOA VISTA MG2 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$39,606.17 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 6 Módulos de Infraestrutura de Manobra 69 kV, arranjo barra principal e transferência, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | MG 230 kV BOA VISTA MG2 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$29,293.41 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Módulo Geral 13,8kV, arranjo barra simples, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | MG 230 kV BOA VISTA MG2 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$6,680.12 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 01 Módulo de Infraestrutura de Manobra 13,8kV, arranjo barra simples, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | MG 230 kV BOA VISTA MG2 RR | DIT | 058/2001 | IPCA | RMEL | REN 905/2020 | 2/28/2013 | 1/6/2031 | R$64,975.42 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | BOA VISTA | MC 69 kV TR 230/69 kV BOA VISTA TR3 RR | DIT | 058/2001 | IPCA | RCDM | DSP 3687/2017 | 7/5/2015 | 6/1/2046 | R$568,990.04 | 6/1/2025 | Ativa | T2019-081 | Instalar, na SE BOA VISTA, um módulo de conexão, em 69 kV, para o transformador trifásico TR3 230/69 kV - 100 MVA, arranjo Barra Principal e Transferência. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | BOA VISTA | MC 69 kV TR 230/69 kV BOA VISTA TR2 RR | DIT | 058/2001 | IPCA | RCDM | REA 3587/2012 | 6/1/2016 | 11/10/2044 | R$80,239.55 | 6/1/2025 | Ativa | T2012-058 | Complementação, na SE Boa Vista, do módulo de conexão 69 kV do TR2 230/69/13,8 kV, para adequação aos Procedimentos de Rede. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | BOA VISTA | MC 69 kV TR 230/69 kV BOA VISTA TR2 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$79,731.82 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Módulo de Conexão 69kV do Transformador TR2 230/69 kV, 100 MVA, arranjo barra principal e transferência, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | MC 69 kV TR 230/69 kV BOA VISTA TR1 RR | DIT | 058/2001 | IPCA | RCDM | REA 3587/2012 | 6/1/2016 | 9/21/2044 | R$80,242.46 | 6/1/2025 | Ativa | T2012-058 | Complementação, na SE Boa Vista, do módulo de conexão 69 kV do TR1 230/69/13,8 kV, para adequação aos Procedimentos de Rede. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | BOA VISTA | MC 69 kV TR 230/69 kV BOA VISTA TR1 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$79,731.82 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Módulo de Conexão 69kV do Transformador TR1 230/69 kV, 100 MVA, arranjo barra principal e transferência, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | MC 230 kV TR 230/69 kV BOA VISTA TR3 RR | DIT | 058/2001 | IPCA | RCDM | DSP 3687/2017 | 7/5/2015 | 10/17/2046 | R$ 1,332,551.12 | 6/1/2025 | Ativa | T2019-081 | Instalar, na SE BOA VISTA, um módulo de conexão, em 230 kV, para o transformador trifásico TR3 230/69 kV - 100 MVA, arranjo Barra Dupla a Quatro Chaves. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | BOA VISTA | MC 230 kV TR 230/69 kV BOA VISTA TR2 RR | DIT | 058/2001 | IPCA | RCDM | REA 3587/2012 | 6/1/2016 | 6/30/2046 | R$549,852.44 | 6/1/2025 | Ativa | T2012-058 | Adequação, na SE Boa Vista, do módulo de conexão 230 kV do TR2 230/69/13,8 kV, de barra simples para barra dupla com quatro chaves. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | BOA VISTA | MC 230 kV TR 230/69 kV BOA VISTA TR2 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$214,217.40 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Módulo de Conexão 230kV do Transformador TR2 230/69 kV, 100 MVA, arranjo barra dupla a quatro chaves, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | MC 230 kV TR 230/69 kV BOA VISTA TR1 RR | DIT | 058/2001 | IPCA | RCDM | REA 3587/2012 | 6/1/2016 | 7/4/2046 | R$549,851.01 | 6/1/2025 | Ativa | T2012-058 | Complementação, na SE Boa Vista, do módulo de conexão 230 kV do TR1 230/69/13,8 kV, de barra simples para barra dupla com quatro chaves. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | BOA VISTA | MC 230 kV TR 230/69 kV BOA VISTA TR1 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$214,217.40 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Módulo de Conexão 230kV do Transformador TR1 230/69 kV, 100 MVA, arranjo barra dupla a quatro chaves, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | MC 230 kV RTL 230 kV 25 Mvar BOA VISTA RTLR1 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$115,537.19 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Módulo de Conexão de Reator reserva 230 kV, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | MC 230 kV RTL 230 kV 25 Mvar BOA VISTA RTL1 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$115,537.19 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Módulo de Conexão de Reator de Linha 230 kV, 25 MVAr, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | MC 13,8 kV TT 13,8/0 kV BOA VISTA TT2 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$60,562.46 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção do Módulo de Conexão do transformador de aterramento 13,8kV, arranjo barra simples, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | MC 13,8 kV TT 13,8/0 kV BOA VISTA TT1 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$60,562.46 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção do Módulo de Conexão do transformador de aterramento 13,8kV, arranjo barra simples, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | MC 13,8 kV BC 13,8 kV 3,6 Mvar BOA VISTA BC9 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$63,038.80 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção do Módulo de Conexão que atende os bancos de capacitores em derivação 13,8kV BC9 e BC10, arranjo barra simples, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | MC 13,8 kV BC 13,8 kV 3,6 Mvar BOA VISTA BC6 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$63,038.80 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção do Módulo de Conexão que atende os bancos de capacitores em derivação 13,8kV BC6, BC7 e BC8, arranjo barra simples, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | MC 13,8 kV BC 13,8 kV 3,6 Mvar BOA VISTA BC4 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$63,038.80 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção do Módulo de Conexão que atende os bancos de capacitores em derivação 13,8kV BC4 e BC5, arranjo barra simples, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | MC 13,8 kV BC 13,8 kV 3,6 Mvar BOA VISTA BC1 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$63,038.80 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção do Módulo de Conexão que atende os bancos de capacitores em derivação 13,8kV BC1, BC2 e C3, arranjo barra simples, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | IB 69 kV MG 230 kV BOA VISTA MG2 RR IB1 | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$61,733.56 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Módulos de Manobra - Interligação de Barras 69 kV, arranjo barra principal e transferência, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | IB 230 kV MG 230 kV BOA VISTA MG2 RR IB1 | DIT | 058/2001 | IPCA | RCDM | REA 3587/2012 | 6/1/2016 | 6/3/2048 | R$847,748.28 | 6/1/2025 | Ativa | T2012-058 | Instalação, na SE Boa Vista, de um módulo de Interligação de Barras IB1, em 230 kV, para arranjo BD4. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | BOA VISTA | EL 69 kV BOA VISTA DIST3 | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$83,800.46 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 69 kV, arranjo principal e transferência, na SE Boa Vista, associada à linha de transmissão 69 kV Boa Vista – Distrito Industrial C1. | ||||
| AXIA Energia Norte | BOA VISTA | EL 69 kV BOA VISTA DIST2 | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$83,800.46 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 69 kV, arranjo principal e transferência, na SE Boa Vista, associada à linha de transmissão 69 kV Boa Vista – Floresta C1. | ||||
| AXIA Energia Norte | BOA VISTA | EL 69 kV BOA VISTA DIST1 | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$83,800.46 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 69 kV, arranjo principal e transferência, na SE Boa Vista, associada à linha de transmissão 69 kV Boa Vista – Centro C1. | ||||
| AXIA Energia Norte | BOA VISTA | EL 230 kV BOA VISTA LT 230 kV BOA VISTA /S.E.UIAREN VEN C-1 RR | RB | FT LT 230 kV BOA VISTA /S.E.UIAREN VEN C-1 RR | 058/2001 | IPCA | RBNI | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$235,979.80 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla a quatro chaves, na subestação Boa Vista, associada à linha de transmissão 230 kV Boa Vista-Santa Elena do Uiarén C1. | |||
| AXIA Energia Norte | BOA VISTA | EL 13,8 kV BOA VISTA DIST1 | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$63,038.80 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 13,8kV, arranjo barra simples, na subestação Boa Vista, associada à linha de transmissão 13,8kV Boa Vista-Floresta. | ||||
| AXIA Energia Norte | BOA VISTA | BC 13,8 kV 3,6 Mvar BOA VISTA BC9 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$12,244.78 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção do Banco de Capacitor BC9 13,8kV, 3,6MVAr, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | BC 13,8 kV 3,6 Mvar BOA VISTA BC8 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$12,244.78 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção do Banco de Capacitor BC8 13,8kV, 3,6MVAr, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | BC 13,8 kV 3,6 Mvar BOA VISTA BC7 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$12,244.78 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção do Banco de Capacitor BC7 13,8kV, 3,6MVAr, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | BC 13,8 kV 3,6 Mvar BOA VISTA BC6 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$12,244.78 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção do Banco de Capacitor BC6 13,8kV, 3,6MVAr, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | BC 13,8 kV 3,6 Mvar BOA VISTA BC5 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$12,244.78 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção do Banco de Capacitor BC5 13,8kV, 3,6MVAr, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | BC 13,8 kV 3,6 Mvar BOA VISTA BC4 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$12,244.78 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção do Banco de Capacitor BC4 13,8kV, 3,6MVAr, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | BC 13,8 kV 3,6 Mvar BOA VISTA BC3 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$12,244.78 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção do Banco de Capacitor BC3 13,8kV, 3,6MVAr, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | BC 13,8 kV 3,6 Mvar BOA VISTA BC2 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$12,244.78 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção do Banco de Capacitor BC2 13,8kV, 3,6MVAr, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | BC 13,8 kV 3,6 Mvar BOA VISTA BC10 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$12,244.78 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção do Banco de Capacitor BC10 13,8kV, 3,6MVAr, na SE Boa Vista. | ||||
| AXIA Energia Norte | BOA VISTA | BC 13,8 kV 3,6 Mvar BOA VISTA BC1 RR | DIT | 058/2001 | IPCA | RCDM | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$12,244.78 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção do Banco de Capacitor BC1 13,8kV, 3,6MVAr, na SE Boa Vista. | ||||
| AXIA Energia Nordeste | BOM NOME | TT 69/13,8 kV BOM NOME TA1 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BOM NOME | TR 69/13,8 kV BOM NOME TR3B PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BOM NOME | TR 69/13,8 kV BOM NOME TR3A PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BOM NOME | TR 230/69 kV BOM NOME TR2 PE | RBF | FT TR 230/69 kV BOM NOME TR2 PE | 061/2001 | IPCA | RBNI | REA 5166/2015 | 2/8/2018 | 1/16/2053 | R$ 2,038,921.07 | 6/1/2025 | Ativa | T2015-006 | Obra de Substituição Completa - Substituir o transformador 230/69 kV - 33 MVA por um transformador 230/69 kV - 100 MVA. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BOM NOME | TR 230/69 kV BOM NOME TR1 PE | RBF | FT TR 230/69 kV BOM NOME TR1 PE | 061/2001 | IPCA | RBNI | REA 5166/2015 | 12/29/2017 | 12/6/2052 | R$ 1,366,317.49 | 6/1/2025 | Ativa | T2015-006 | Obra de Substituição Completa - Substituir o transformador 230/69 kV - 33 MVA por um transformador 230/69 kV - 100 MVA *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BOM NOME | TR 230/138 kV BOM NOME TR7 PE | RBF | FT TR 230/138 kV BOM NOME TR7 PE | 061/2001 | IPCA | RBNIA | DSP 2014/2023 | R$ 2,063,463.50 | 6/1/2025 | Prevista | T2023-109 | Instalação do 4º TF 230/138 kV – 100 MVA na SE Bom Nome | ||||
| AXIA Energia Nordeste | BOM NOME | TR 230/138 kV BOM NOME TR6 PE | RBF | FT TR 230/138 kV BOM NOME TR6 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,822.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | TR 230/138 kV BOM NOME TR6 PE | RBF | FT TR 230/138 kV BOM NOME TR6 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/29/2018 | 7/6/2053 | R$ 52.45 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BOM NOME | TR 230/138 kV BOM NOME TR5 PE | RBF | FT TR 230/138 kV BOM NOME TR5 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,822.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | TR 230/138 kV BOM NOME TR4 PE | RBF | FT TR 230/138 kV BOM NOME TR4 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,822.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | TR 230/138 kV BOM NOME TR4 PE | RBF | FT TR 230/138 kV BOM NOME TR4 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,040,589.26 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | TR 230/138 kV BOM NOME TR4 PE | RBF | FT TR 230/138 kV BOM NOME TR4 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$959,296.16 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | MG 230 kV BOM NOME MG1 PE | RB | FT MG 230 kV BOM NOME MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$744,264.12 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | MG 230 kV BOM NOME MG1 PE | RB | FT MG 230 kV BOM NOME MG1 PE | 061/2001 | IPCA | RBNI | REA 3229/2011 | 1/30/2013 | 7/12/2043 | R$112,122.22 | 6/1/2025 | Ativa | Complementação do módulo geral com um módulo de infraestrutura de manobra associado a entrada de linha em 138 kV para SE Salgueiro, da CELPE. Reforço autorizado pela REA 3229/2011. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BOM NOME | MG 230 kV BOM NOME MG1 PE | RB | FT MG 230 kV BOM NOME MG1 PE | 061/2001 | IPCA | RBNI | REA 5166/2015 | 6/6/2018 | 6/5/2058 | R$ 107.03 | 6/1/2025 | Ativa | T2015-006 | Adequar de módulo de infraestrutura geral referente a troca do barramento 230 kV da SE Bom Nome. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BOM NOME | MG 230 kV BOM NOME MG1 PE | RB | FT MG 230 kV BOM NOME MG1 PE | 061/2001 | IPCA | RBNI | REA 5166/2015 | 6/6/2018 | 3/19/2051 | R$ 835.86 | 6/1/2025 | Ativa | T2015-006 | Adequar o módulo de infraestrutura geral referente a troca do barramento 69 kV da SE Bom Nome. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BOM NOME | MG 230 kV BOM NOME MG1 PE | RB | FT MG 230 kV BOM NOME MG1 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/19/2013 | 7/18/2030 | R$4,315.85 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCOS DE BATERIAS -48Vcc.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BOM NOME | MG 230 kV BOM NOME MG1 PE | RB | FT MG 230 kV BOM NOME MG1 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/30/2013 | 12/29/2041 | R$59,106.96 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SISTEMAS AUTOMÁTICOS DE REGULAÇÃO ASSOCIADOS A TRANSFORMADORES.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BOM NOME | MG 230 kV BOM NOME MG1 PE | RB | FT MG 230 kV BOM NOME MG1 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/17/2015 | 12/16/2032 | R$26,995.39 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição das Bateriais Saturnia 60PZS400 250Vcc, Posições 900A1 e 900A2.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BOM NOME | MG 230 kV BOM NOME MG1 PE | RB | FT MG 230 kV BOM NOME MG1 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 1/31/2015 | 1/30/2043 | R$42,111.91 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DO CONCENTRADOR DE DADOS PARA ATENDIMENTO AO AUMENTO DA OBSERVABILIDADE ASSOCIADA AO PROCEDIMENTO DE REDE 2.7..Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BOM NOME | MG 230 kV BOM NOME MG1 PE | RB | FT MG 230 kV BOM NOME MG1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,088,530.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | MG 230 kV BOM NOME MG1 PE | RB | FT MG 230 kV BOM NOME MG1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,925,370.29 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | MG 230 kV BOM NOME MG1 PE | RB | FT MG 230 kV BOM NOME MG1 PE | 061/2001 | IPCA | RMEL | REN 443/2011 | 3/5/2016 | 3/4/2031 | R$36,851.31 | 6/1/2025 | Ativa | Revitalização Necessária: Implantação de Switches Industriais * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BOM NOME | MG 230 kV BOM NOME MG1 PE | RB | FT MG 230 kV BOM NOME MG1 PE | 061/2001 | IPCA | RMEL | REN 443/2011 | 8/30/2016 | 8/29/2033 | R$8,084.78 | 6/1/2025 | Ativa | Implantação de Banco de Baterias * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BOM NOME | MG 230 kV BOM NOME MG1 PE | RB | FT MG 230 kV BOM NOME MG1 PE | 061/2001 | IPCA | RBNI | REA 12075/2022 | 4/5/2019 | 12/31/2042 | R$10,595.61 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra em 230 kV, arranjo barra dupla com quatro chaves, na Subestação Bom Nome, associada à conexão de atendimento ao Consumidor Livre CODEVASF. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BOM NOME | MG 230 kV BOM NOME MG1 PE | RB | FT MG 230 kV BOM NOME MG1 PE | 061/2001 | IPCA | RBNIA | DSP 2014/2023 | R$179,634.80 | 6/1/2025 | Prevista | T2023-109 | Módulo de infraestrutura associado a instalação da conexão em 230 kV, arranjo BPT, para o 4º TF 230/138 kV – 100 MVA, na SE Bom Nome | ||||
| AXIA Energia Nordeste | BOM NOME | MG 230 kV BOM NOME MG1 PE | RB | FT MG 230 kV BOM NOME MG1 PE | 061/2001 | IPCA | RBNIA | DSP 2014/2023 | R$114,816.90 | 6/1/2025 | Prevista | T2023-109 | Módulo de infraestrutura associado a instalação da conexão em 138 kV, arranjo BPT, para o 4º TF 230/138 kV – 100 MVA, na SE Bom Nome | ||||
| AXIA Energia Nordeste | BOM NOME | MG 230 kV BOM NOME MG1 PE | RB | FT MG 230 kV BOM NOME MG1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/14/2021 | 3/27/2038 | R$376,256.89 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BOM NOME | MC 69 kV TT 69/13,8 kV BOM NOME TA1 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BOM NOME | MC 69 kV TR 69/13,8 kV BOM NOME TR3B PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$56,157.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BOM NOME | MC 69 kV TR 69/13,8 kV BOM NOME TR3A PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BOM NOME | MC 69 kV TR 69/13,8 kV BOM NOME TR3A PE | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/28/2021 | 10/27/2045 | R$7,958.75 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BOM NOME | MC 69 kV TR 230/69 kV BOM NOME TR2 PE | RBF | FT TR 230/69 kV BOM NOME TR2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | MC 69 kV TR 230/69 kV BOM NOME TR2 PE | RBF | FT TR 230/69 kV BOM NOME TR2 PE | 061/2001 | IPCA | RBNI | REA 5166/2015 | 2/8/2018 | 5/8/2049 | R$177,817.52 | 6/1/2025 | Ativa | T2015-006 | Adequar do módulo de conexão de transformador 69 kV, com a substituição do disjuntor, chaves seccionadoras, TC e Para raios na SE Bom Nome. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BOM NOME | MC 69 kV TR 230/69 kV BOM NOME TR1 PE | RBF | FT TR 230/69 kV BOM NOME TR1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | MC 69 kV TR 230/69 kV BOM NOME TR1 PE | RBF | FT TR 230/69 kV BOM NOME TR1 PE | 061/2001 | IPCA | RBNI | REA 5166/2015 | 12/29/2017 | 2/24/2049 | R$157,817.35 | 6/1/2025 | Ativa | T2015-006 | Adequar do módulo de conexão de transformador 69 kV, com a substituição do disjuntor, chaves seccionadoras, TC e Para raios na SE Bom Nome. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BOM NOME | MC 230 kV TR 230/69 kV BOM NOME TR2 PE | RBF | FT TR 230/69 kV BOM NOME TR2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | MC 230 kV TR 230/69 kV BOM NOME TR2 PE | RBF | FT TR 230/69 kV BOM NOME TR2 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/20/2013 | 10/13/2046 | R$94,152.28 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DO DISJUNTOR FABRICADO POR SIEMENS MODELO H912 14T2 230 KV. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BOM NOME | MC 230 kV TR 230/69 kV BOM NOME TR1 PE | RBF | FT TR 230/69 kV BOM NOME TR1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | MC 230 kV TR 230/69 kV BOM NOME TR1 PE | RBF | FT TR 230/69 kV BOM NOME TR1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/6/2017 | 12/9/2047 | R$53,688.41 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BOM NOME | MC 230 kV TR 230/138 kV BOM NOME TR7 PE | RBF | FT TR 230/138 kV BOM NOME TR7 PE | 061/2001 | IPCA | RBNIA | DSP 2014/2023 | R$ 1,529,238.76 | 6/1/2025 | Prevista | T2023-109 | Instalação, na SE BOM NOME, de um módulo de conexão, em 230 kV, para o autotransformador TR 230/138 kV BOM NOME TR7 PE | ||||
| AXIA Energia Nordeste | BOM NOME | MC 230 kV TR 230/138 kV BOM NOME TR6 PE | RBF | FT TR 230/138 kV BOM NOME TR6 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | MC 230 kV TR 230/138 kV BOM NOME TR5 PE | RBF | FT TR 230/138 kV BOM NOME TR5 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | MC 230 kV TR 230/138 kV BOM NOME TR4 PE | RBF | FT TR 230/138 kV BOM NOME TR4 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | MC 230 kV TR 230/138 kV BOM NOME TR4 PE | RBF | FT TR 230/138 kV BOM NOME TR4 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$410,719.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | MC 230 kV TR 230/138 kV BOM NOME TR4 PE | RBF | FT TR 230/138 kV BOM NOME TR4 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/10/2021 | 10/9/2045 | R$25,558.44 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BOM NOME | MC 138 kV TR 230/138 kV BOM NOME TR7 PE | RBF | FT TR 230/138 kV BOM NOME TR7 PE | 061/2001 | IPCA | RBNIA | DSP 2014/2023 | R$ 1,176,489.07 | 6/1/2025 | Prevista | T2023-109 | Instalação, na SE BOM NOME, de um módulo de conexão, em 138 kV, para o autotransformador TR 230/138 kV BOM NOME TR7 PE | ||||
| AXIA Energia Nordeste | BOM NOME | MC 138 kV TR 230/138 kV BOM NOME TR6 PE | RBF | FT TR 230/138 kV BOM NOME TR6 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$112,381.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | MC 138 kV TR 230/138 kV BOM NOME TR5 PE | RBF | FT TR 230/138 kV BOM NOME TR5 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$112,381.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | MC 138 kV TR 230/138 kV BOM NOME TR4 PE | RBF | FT TR 230/138 kV BOM NOME TR4 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$112,381.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | MC 138 kV TR 230/138 kV BOM NOME TR4 PE | RBF | FT TR 230/138 kV BOM NOME TR4 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/10/2021 | 10/9/2045 | R$6,927.89 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BOM NOME | MC 13,8 kV TR 69/13,8 kV BOM NOME TR3A PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BOM NOME | MC 13,8 kV TR 69/13,8 kV BOM NOME TR3A PE | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 9/30/2012 | 9/29/2035 | R$7,452.45 | 6/1/2025 | Ativa | Substituição dos TCs de Medição Operacional 13,8 kV associados ao disjuntor 11T3. Reforço autorizado pela REA 2040/2009. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BOM NOME | IB 69 kV MG 230 kV BOM NOME MG1 PE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BOM NOME | IB 69 kV MG 230 kV BOM NOME MG1 PE IB1 | DIT | 061/2001 | IPCA | RCDM | REA 5166/2015 | 6/6/2018 | 10/3/2050 | R$50,839.28 | 6/1/2025 | Ativa | T2015-006 | Adequar do módulo de interligação de barramentos 69 kV, com a substituição das chaves seccionadoras na SE Bom Nome. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BOM NOME | IB 69 kV MG 230 kV BOM NOME MG1 PE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$118,244.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BOM NOME | IB 69 kV MG 230 kV BOM NOME MG1 PE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$109,007.13 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BOM NOME | IB 230 kV MG 230 kV BOM NOME MG1 PE IB1 | RB | FT MG 230 kV BOM NOME MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,837.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | IB 230 kV MG 230 kV BOM NOME MG1 PE IB1 | RB | FT MG 230 kV BOM NOME MG1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$325,059.40 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | IB 230 kV MG 230 kV BOM NOME MG1 PE IB1 | RB | FT MG 230 kV BOM NOME MG1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$299,665.05 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | IB 138 kV MG 230 kV BOM NOME MG1 PE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$86,825.51 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BOM NOME | EL 69 kV BOM NOME SERRA TALHADA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BOM NOME | EL 69 kV BOM NOME SERRA TALHADA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/5/2018 | 7/7/2048 | R$30,878.56 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BOM NOME | EL 69 kV BOM NOME SALGUEIRO | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BOM NOME | EL 69 kV BOM NOME SALGUEIRO | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/8/2022 | 6/10/2052 | R$34,587.27 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BOM NOME | EL 230 kV BOM NOME TRANSPOSICAO N3 | DIT | 061/2001 | IPCA | RCDM | REA 12075/2022 | 4/5/2019 | 12/31/2042 | R$107,644.84 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo barra dupla com quatro chaves, na Subestação Bom Nome, associada à conexão de atendimento ao Consumidor Livre CODEVASF. *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BOM NOME | EL 230 kV BOM NOME LT 230 kV TACARATU /BOM NOME C-1 PE | RB | FT LT 230 kV TACARATU /BOM NOME C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | EL 230 kV BOM NOME LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE | RB | FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | EL 230 kV BOM NOME LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE | RB | FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$596,907.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | EL 230 kV BOM NOME LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE | RB | FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/21/2021 | 10/24/2051 | R$57,737.69 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BOM NOME | EL 230 kV BOM NOME LT 230 kV FLORESTA II /BOM NOME C-1 PE | RB | FT LT 230 kV FLORESTA II /BOM NOME C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | EL 230 kV BOM NOME LT 230 kV FLORESTA II /BOM NOME C-1 PE | RB | FT LT 230 kV FLORESTA II /BOM NOME C-1 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/30/2013 | 10/23/2046 | R$94,235.46 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DO DISJUNTOR FABRICADO POR SIEMENS MODELO H912 14F2 230 KV. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BOM NOME | EL 230 kV BOM NOME LT 230 kV FLORESTA II /BOM NOME C-1 PE | RB | FT LT 230 kV FLORESTA II /BOM NOME C-1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/21/2021 | 9/2/2048 | R$138,260.14 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BOM NOME | EL 230 kV BOM NOME LT 230 kV BOM NOME /MILAGRES C-1 PE/CE | RB | FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | EL 230 kV BOM NOME LT 230 kV BOM NOME /MILAGRES C-1 PE/CE | RB | FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/10/2013 | 10/3/2046 | R$94,069.10 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DO DISJUNTOR FABRICADO POR SIEMENS MODELO H912 14L2 230 KV. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BOM NOME | EL 230 kV BOM NOME LT 230 kV BOM NOME /MILAGRES C-1 PE/CE | RB | FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/23/2021 | 2/5/2045 | R$177,349.80 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BOM NOME | EL 230 kV BOM NOME LT 230 kV BOM NOME /MAURITI II C-1 PE/CE | RB | FT LT 230 kV BOM NOME /MAURITI II C-1 PE/CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | EL 230 kV BOM NOME LT 230 kV BOM NOME /MAURITI II C-1 PE/CE | RB | FT LT 230 kV BOM NOME /MAURITI II C-1 PE/CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$596,907.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | EL 230 kV BOM NOME LT 230 kV BOM NOME /MAURITI II C-1 PE/CE | RB | FT LT 230 kV BOM NOME /MAURITI II C-1 PE/CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/11/2021 | 7/5/2046 | R$73,208.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| Nova Era Integração | BOM NOME | EL 230 kV BOM NOME LT 230 kV BOM NOME /BOM NOME II C-2 PE | RB | FT LT 230 kV BOM NOME /BOM NOME II C-2 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,356,899.31 | 6/1/2025 | Prevista | T2024-197-A | LT 230 kV Bom Nome - Bom Nome II - C1LT 230 kV Bom Nome - Bom Nome II - C2 | ||||
| Nova Era Integração | BOM NOME | EL 230 kV BOM NOME LT 230 kV BOM NOME /BOM NOME II C-1 PE | RB | FT LT 230 kV BOM NOME /BOM NOME II C-1 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,356,899.31 | 6/1/2025 | Prevista | T2024-197-A | LT 230 kV Bom Nome - Bom Nome II - C1LT 230 kV Bom Nome - Bom Nome II - C2 | ||||
| AXIA Energia Nordeste | BOM NOME | EL 230 kV BOM NOME LT 230 kV BOM NOME /ABAIARA C-1 PE/CE | RB | FT LT 230 kV BOM NOME /ABAIARA C-1 PE/CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BOM NOME | EL 230 kV BOM NOME LT 230 kV BOM NOME /ABAIARA C-1 PE/CE | RB | FT LT 230 kV BOM NOME /ABAIARA C-1 PE/CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/2/2015 | 7/4/2045 | R$2,277.68 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de Isoladores de Chaves Seccionadoras/Aterramento, Tensão 230 kV, Fabricação CEME, Tipos S3CVT e ST, Posições 34L2-5 e 34L2-7.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BOM NOME | EL 230 kV BOM NOME LT 230 kV BOM NOME /ABAIARA C-1 PE/CE | RB | FT LT 230 kV BOM NOME /ABAIARA C-1 PE/CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2021 | 12/31/2035 | R$28,640.71 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BOM NOME | EL 138 kV BOM NOME SALGUEIRO-03C3 | DIT | 061/2001 | IPCA | RCDM | REA 3229/2011 | 1/30/2013 | 1/29/2045 | R$735,308.34 | 6/1/2025 | Ativa | Instalar um módulo de entrada de linha de 138 kV para SE Salgueiro, da CELPE. Reforço autorizado pela REA 3229/2011. Incluído no reajuste ciclo 2013/2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BOM NOME | EL 138 kV BOM NOME SALGUEIRO 03C2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$167,571.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BOM NOME | EL 138 kV BOM NOME SALGUEIRO 03C2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2021 | 12/31/2035 | R$14,320.36 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BOM NOME | EL 138 kV BOM NOME FLORES-03C1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$167,571.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BOM NOME | EL 138 kV BOM NOME FLORES-03C1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/25/2022 | 2/25/2051 | R$51,913.82 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BOM NOME | EL 13,8 kV BOM NOME 01Y3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BOM NOME | EL 13,8 kV BOM NOME 01Y2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BOM NOME | EL 13,8 kV BOM NOME 01Y2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/3/2021 | 10/2/2054 | R$31,978.30 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BOM NOME | EL 13,8 kV BOM NOME 01Y1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BOM NOME | EL 13,8 kV BOM NOME 01Y1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/8/2021 | 4/7/2054 | R$31,577.89 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| Nova Era Integração | BOM NOME II | TR 500/230 kV BOM NOME II TRR1 PE | RB | FT TR 500/230 kV BOM NOME II TRR1 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 2,006,741.10 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II | ||||
| Nova Era Integração | BOM NOME II | TR 500/230 kV BOM NOME II TR2 PE | RB | FT TR 500/230 kV BOM NOME II TR2 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 6,020,223.30 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II | ||||
| Nova Era Integração | BOM NOME II | TR 500/230 kV BOM NOME II TR1 PE | RB | FT TR 500/230 kV BOM NOME II TR1 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 6,020,223.30 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II | ||||
| Nova Era Integração | BOM NOME II | TR 230/138 kV BOM NOME II TR4 PE | RBF | FT TR 230/138 kV BOM NOME II TR4 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,853,040.28 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II | ||||
| Nova Era Integração | BOM NOME II | TR 230/138 kV BOM NOME II TR3 PE | RBF | FT TR 230/138 kV BOM NOME II TR3 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,853,040.28 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II | ||||
| Nova Era Integração | BOM NOME II | RTL 500 kV 55 Mvar BOM NOME II RTR2 PE | RB | FT RTL 500 kV 55 Mvar BOM NOME II RTR2 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$635,513.41 | 6/1/2025 | Prevista | T2024-197-F | LT 500 kV Bom Nome II – Campo Formoso II C1 | ||||
| Nova Era Integração | BOM NOME II | RTL 500 kV 165 Mvar BOM NOME II RT3 PE | RB | FT LT 500 kV BOM NOME II /CAMPO FORMOSO II C-1 PE/BA | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,906,540.21 | 6/1/2025 | Prevista | T2024-197-F | LT 500 kV Bom Nome II – Campo Formoso II C1 | ||||
| Nova Era Integração | BOM NOME II | RTL 500 kV 150 Mvar BOM NOME II RT4 PE | RB | FT LT 500 kV BOM NOME II /ZEBU III C-1 PE/AL | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,881,890.14 | 6/1/2025 | Prevista | T2024-197-A | LT 500 kV Bom Nome II – Zebu III C1 | ||||
| Nova Era Integração | BOM NOME II | RTB 500 kV 50 Mvar BOM NOME II RTR1 PE | RB | FT RTB 500 kV 50 Mvar BOM NOME II RTR1 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$627,213.94 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II | ||||
| Nova Era Integração | BOM NOME II | RTB 500 kV 150 Mvar BOM NOME II RT2 PE | RB | FT RTB 500 kV 150 Mvar BOM NOME II RT2 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,881,641.81 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II | ||||
| Nova Era Integração | BOM NOME II | RTB 500 kV 150 Mvar BOM NOME II RT1 PE | RB | FT RTB 500 kV 150 Mvar BOM NOME II RT1 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,881,641.81 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II | ||||
| Nova Era Integração | BOM NOME II | MG 500 kV BOM NOME II MG1 PE | RB | FT MG 500 kV BOM NOME II MG1 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 4,075,257.84 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II | ||||
| Nova Era Integração | BOM NOME II | MC 500 kV TR 500/230 kV BOM NOME II TR2 PE | RB | FT TR 500/230 kV BOM NOME II TR2 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,583,357.15 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II | ||||
| Nova Era Integração | BOM NOME II | MC 500 kV TR 500/230 kV BOM NOME II TR1 PE | RB | FT TR 500/230 kV BOM NOME II TR1 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,583,357.15 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II | ||||
| Nova Era Integração | BOM NOME II | MC 500 kV RTL 500 kV 165 Mvar BOM NOME II RT3 PE | RB | FT LT 500 kV BOM NOME II /CAMPO FORMOSO II C-1 PE/BA | 008/2024 | IPCA | RBL | CC 008/2024 | R$366,483.72 | 6/1/2025 | Prevista | T2024-197-F | LT 500 kV Bom Nome II – Campo Formoso II C1 | ||||
| Nova Era Integração | BOM NOME II | MC 500 kV RTL 500 kV 150 Mvar BOM NOME II RT4 PE | RB | FT LT 500 kV BOM NOME II /ZEBU III C-1 PE/AL | 008/2024 | IPCA | RBL | CC 008/2024 | R$366,424.06 | 6/1/2025 | Prevista | T2024-197-A | LT 500 kV Bom Nome II – Zebu III C1 | ||||
| Nova Era Integração | BOM NOME II | MC 500 kV RTB 500 kV 150 Mvar BOM NOME II RT2 PE | RB | FT RTB 500 kV 150 Mvar BOM NOME II RT2 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,283,042.38 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II | ||||
| Nova Era Integração | BOM NOME II | MC 500 kV RTB 500 kV 150 Mvar BOM NOME II RT1 PE | RB | FT RTB 500 kV 150 Mvar BOM NOME II RT1 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,283,042.38 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II | ||||
| Nova Era Integração | BOM NOME II | MC 230 kV TR 500/230 kV BOM NOME II TR2 PE | RB | FT TR 500/230 kV BOM NOME II TR2 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,041,865.50 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II | ||||
| Nova Era Integração | BOM NOME II | MC 230 kV TR 500/230 kV BOM NOME II TR1 PE | RB | FT TR 500/230 kV BOM NOME II TR1 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,041,865.50 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II | ||||
| Nova Era Integração | BOM NOME II | MC 230 kV TR 230/138 kV BOM NOME II TR4 PE | RBF | FT TR 230/138 kV BOM NOME II TR4 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,162,033.23 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II | ||||
| Nova Era Integração | BOM NOME II | MC 230 kV TR 230/138 kV BOM NOME II TR3 PE | RBF | FT TR 230/138 kV BOM NOME II TR3 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,162,033.23 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II | ||||
| Nova Era Integração | BOM NOME II | MC 138 kV TR 230/138 kV BOM NOME II TR4 PE | RBF | FT TR 230/138 kV BOM NOME II TR4 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$807,661.18 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II | ||||
| Nova Era Integração | BOM NOME II | MC 138 kV TR 230/138 kV BOM NOME II TR3 PE | RBF | FT TR 230/138 kV BOM NOME II TR3 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$807,661.18 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II | ||||
| Nova Era Integração | BOM NOME II | IB 500 kV MG 500 kV BOM NOME II MG1 PE IB4 | RB | FT MG 500 kV BOM NOME II MG1 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,495,321.99 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II | ||||
| Nova Era Integração | BOM NOME II | IB 500 kV MG 500 kV BOM NOME II MG1 PE IB3 | RB | FT MG 500 kV BOM NOME II MG1 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,495,321.99 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II | ||||
| Nova Era Integração | BOM NOME II | IB 500 kV MG 500 kV BOM NOME II MG1 PE IB2 | RB | FT MG 500 kV BOM NOME II MG1 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,495,321.99 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II | ||||
| Nova Era Integração | BOM NOME II | IB 500 kV MG 500 kV BOM NOME II MG1 PE IB1 | RB | FT MG 500 kV BOM NOME II MG1 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,495,321.99 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II | ||||
| Nova Era Integração | BOM NOME II | IB 230 kV MG 500 kV BOM NOME II MG1 PE IB1 | RB | FT MG 500 kV BOM NOME II MG1 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,636,137.36 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II | ||||
| Nova Era Integração | BOM NOME II | IB 138 kV MG 500 kV BOM NOME II MG1 PE IB1 | DIT | 008/2024 | IPCA | RPEC | CC 008/2024 | R$813,887.09 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II (Pátio em 138 kV) – DIT. | |||||
| Nova Era Integração | BOM NOME II | EL 500 kV BOM NOME II LT 500 kV BOM NOME II /ZEBU III C-1 PE/AL | RB | FT LT 500 kV BOM NOME II /ZEBU III C-1 PE/AL | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,404,852.11 | 6/1/2025 | Prevista | T2024-197-A | LT 500 kV Bom Nome II – Zebu III C1 | ||||
| Nova Era Integração | BOM NOME II | EL 500 kV BOM NOME II LT 500 kV BOM NOME II /CAMPO FORMOSO II C-1 PE/BA | RB | FT LT 500 kV BOM NOME II /CAMPO FORMOSO II C-1 PE/BA | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,405,080.84 | 6/1/2025 | Prevista | T2024-197-F | LT 500 kV Bom Nome II – Campo Formoso II C1 | ||||
| Nova Era Integração | BOM NOME II | EL 230 kV BOM NOME II LT 230 kV BOM NOME /BOM NOME II C-2 PE | RB | FT LT 230 kV BOM NOME /BOM NOME II C-2 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,124,055.37 | 6/1/2025 | Prevista | T2024-197-A | LT 230 kV Bom Nome - Bom Nome II - C1LT 230 kV Bom Nome - Bom Nome II - C2 | ||||
| Nova Era Integração | BOM NOME II | EL 230 kV BOM NOME II LT 230 kV BOM NOME /BOM NOME II C-1 PE | RB | FT LT 230 kV BOM NOME /BOM NOME II C-1 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,124,055.37 | 6/1/2025 | Prevista | T2024-197-A | LT 230 kV Bom Nome - Bom Nome II - C1LT 230 kV Bom Nome - Bom Nome II - C2 | ||||
| Nova Era Integração | BOM NOME II | EL 138 kV BOM NOME II DIST2 | DIT | 008/2024 | IPCA | RPEC | CC 008/2024 | R$845,775.17 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II (Pátio em 138 kV) – DIT. | |||||
| Nova Era Integração | BOM NOME II | EL 138 kV BOM NOME II DIST1 | DIT | 008/2024 | IPCA | RPEC | CC 008/2024 | R$845,775.17 | 6/1/2025 | Prevista | T2024-197-A | SE 500/230/138 kV Bom Nome II (Pátio em 138 kV) – DIT. | |||||
| AXIA Energia Nordeste | BONGI | TT 69/13,8 kV BONGI TA2 PE | DIT | 061/2001 | IPCA | RCDM | REA 3578/2012 | 3/22/2015 | 11/17/2045 | R$178,510.42 | 6/1/2025 | Ativa | Obra de Substituição Completa - Substituição de transformador de aterramento 02A2.Incluído no reajuste ciclo 2015-2016 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | TT 69/13,8 kV BONGI TA1 PE | DIT | 061/2001 | IPCA | RCDM | REA 3578/2012 | 3/30/2015 | 11/25/2045 | R$178,619.94 | 6/1/2025 | Ativa | Obra de Substituição Completa - Substituição de transformador de aterramento 02A1.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | TT 69/0 kV BONGI TA3 PE | DIT | 061/2001 | IPCA | RCDM | REA 12074/2022 | 8/26/2024 | 8/25/2054 | R$358,197.44 | 6/1/2025 | Ativa | T2022-032 | Instalação de um transformador de aterramento 69 kV, 15 MVA, em paralelo aos dois atualmente existentes | |||
| AXIA Energia Nordeste | BONGI | TR 69/13,8 kV BONGI TR2-B PE | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | TR 69/13,8 kV BONGI TR1-A PE | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | TR 230/69 kV BONGI TR5 PE | RBF | FT TR 230/69 kV BONGI TR5 PE | 061/2001 | IPCA | RBNI | REA 12074/2022 | 11/5/2024 | 11/4/2059 | R$ 2,269,369.61 | 6/1/2025 | Ativa | T2022-032 | Instalar, na SE BONGI, de uma transformação trifásica TR5 230/69-13,8 KV - 200 MVA. | ||
| AXIA Energia Nordeste | BONGI | TR 230/69 kV BONGI TR4 PE | RBF | FT TR 230/69 kV BONGI TR4 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | TR 230/69 kV BONGI TR4 PE | RBF | FT TR 230/69 kV BONGI TR4 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | TR 230/69 kV BONGI TR4 PE | RBF | FT TR 230/69 kV BONGI TR4 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$913,997.96 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | TR 230/69 kV BONGI TR3 PE | RBF | FT TR 230/69 kV BONGI TR3 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | TR 230/69 kV BONGI TR3 PE | RBF | FT TR 230/69 kV BONGI TR3 PE | 061/2001 | IPCA | RBNIA | REA 12074/2022 | R$ 2,417,407.44 | 6/1/2025 | Prevista | T2022-032 | Obra de Substituição Completa - Substituição do transformador trifásico TR3 (230-69 kV – 100 MVA) por nova unidade de 200 MVA | ||||
| AXIA Energia Nordeste | BONGI | TR 230/69 kV BONGI TR2 PE | RBF | FT TR 230/69 kV BONGI TR2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | TR 230/69 kV BONGI TR2 PE | RBF | FT TR 230/69 kV BONGI TR2 PE | 061/2001 | IPCA | RBNIA | REA 12074/2022 | R$ 2,417,407.44 | 6/1/2025 | Prevista | T2022-032 | Obra de Substituição Completa - Substituição do transformador trifásico TR2 (230-69 kV – 100 MVA) por nova unidade de 200 MVA | 3T25 | |||
| AXIA Energia Nordeste | BONGI | TR 230/69 kV BONGI TR1 PE | RBF | FT TR 230/69 kV BONGI TR1 PE | 061/2001 | IPCA | RBNI | REA 12074/2022 | 4/28/2025 | 4/27/2060 | R$ 2,417,407.44 | 6/1/2025 | Ativa | T2022-032 | Obra de Substituição Completa - Substituição do transformador trifásico TR1 (230-69 kV – 100 MVA) por nova unidade de 200 MVA | ||
| AXIA Energia Nordeste | BONGI | TR 230/13,8 kV BONGI TR7 PE | RBF | FT TR 230/13,8 kV BONGI TR7 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$213,042.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | TR 230/13,8 kV BONGI TR7 PE | RBF | FT TR 230/13,8 kV BONGI TR7 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2021 | 12/10/2055 | R$6,640.32 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BONGI | TR 230/13,8 kV BONGI TR6 PE | RBF | FT TR 230/13,8 kV BONGI TR6 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$213,042.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | TR 230/13,8 kV BONGI TR6 PE | RBF | FT TR 230/13,8 kV BONGI TR6 PE | 061/2001 | IPCA | RMEL | REN 443/2011 | 4/7/2016 | 4/10/2046 | R$1,208.37 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BONGI | TR 230/13,8 kV BONGI TR5 PE | RBF | FT TR 230/13,8 kV BONGI TR5 PE | 061/2001 | IPCA | RBNI | REA 3402/2012 | 1/14/2016 | 7/9/2050 | R$869,261.91 | 6/1/2025 | Ativa | T2012-021 | Instalar, na SE Bongi, o terceiro transformador 230/13,8 kV - 40 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BONGI | TR 230/13,8 kV BONGI TR5 PE | RBF | FT TR 230/13,8 kV BONGI TR5 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/12/2021 | 11/19/2056 | R$1,168.80 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BONGI | RTS 13,8 kV 5 Mvar BONGI RT2 PE | RBF | FT TR 230/69 kV BONGI TR2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | RTS 13,8 kV 5 Mvar BONGI RT2 PE | RBF | FT TR 230/69 kV BONGI TR2 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$351,841.75 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | RTS 13,8 kV 5 Mvar BONGI RT1 PE | RBF | FT TR 230/69 kV BONGI TR3 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | RTS 13,8 kV 5 Mvar BONGI RT1 PE | RBF | FT TR 230/69 kV BONGI TR3 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$351,841.75 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | MG 230 kV BONGI MG1 PE | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RBNI | REA 3402/2012 | 1/14/2016 | 5/28/2046 | R$103,335.99 | 6/1/2025 | Ativa | T2012-021 | Complementar, na SE Bongi, o módulo geral da subestação para a instalação do terceiro transformador 230/13,8 kV - 40 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BONGI | MG 230 kV BONGI MG1 PE | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$699,645.16 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | MG 230 kV BONGI MG1 PE | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RBNI | REA 2376/2010 | 5/6/2012 | 5/5/2027 | R$18,336.50 | 6/1/2025 | Ativa | Implantação de um sistema de aquisição de dados para integração de dispositivos de proteção, controle e regulação. Melhoria apresentada na REA 2376/2010 enquadrada como reforço pelo disposto na REN 443/2011. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BONGI | MG 230 kV BONGI MG1 PE | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RBNI | REA 1814/2009 | 1/1/2013 | 12/31/2045 | R$29,210.18 | 6/1/2025 | Ativa | Substituição Disjuntor Superado - 12T8. O disjuntor de 69 kV faz parte da conexão dos transformadores de serviços auxiliares na barra de 69 kV da subestação e por isso foi cadastrado no módulo geral. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BONGI | MG 230 kV BONGI MG1 PE | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/4/2013 | 7/3/2030 | R$2,151.83 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCOS DE BATERIAS -48Vcc. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BONGI | MG 230 kV BONGI MG1 PE | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/6/2013 | 9/5/2030 | R$23,369.16 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCO DE BATERIAS 900A1 E 900A2 DE 250 Vcc. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BONGI | MG 230 kV BONGI MG1 PE | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/24/2015 | 7/23/2030 | R$11,852.70 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SWITCH.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BONGI | MG 230 kV BONGI MG1 PE | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,963,322.54 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | MG 230 kV BONGI MG1 PE | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,809,943.50 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | MG 230 kV BONGI MG1 PE | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RMEL | REN 443/2011 | 8/30/2016 | 8/29/2031 | R$158,614.00 | 6/1/2025 | Ativa | Revitalização Necessária: Implantação de Sistema de Transporte Óptico (OTN/ SDH) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BONGI | MG 230 kV BONGI MG1 PE | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RMEL | REN 443/2011 | 3/28/2016 | 3/27/2031 | R$23,340.66 | 6/1/2025 | Ativa | Revitalização Necessária: Implantação de Switches Industriais * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BONGI | MG 230 kV BONGI MG1 PE | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RMEL | REN 443/2011 | 8/30/2016 | 8/29/2033 | R$7,134.02 | 6/1/2025 | Ativa | Implantação de Banco de Baterias * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BONGI | MG 230 kV BONGI MG1 PE | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RMEL | REN 443/2011 | 11/18/2016 | 11/17/2033 | R$12,708.13 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DO GRUPO GERADOR EMERGÊNCIA TOSHIBA-IRNE GAET * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BONGI | MG 230 kV BONGI MG1 PE | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RMEL | REN 443/2011 | 6/6/2017 | 6/9/2047 | R$ 318.49 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DO SISTEMA DE MONITORAMENTO DA CHAVE SECCIONADORA, POSIÇÃO 34BA-1 DA SUB BONGI * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BONGI | MG 230 kV BONGI MG1 PE | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RBNIA | REA 12074/2022 | R$170,635.04 | 6/1/2025 | Prevista | T2022-032 | Módulo de Infraestrutura de Manobra (230KV - BPT) para o 5º transformador trifásico | 4T25 | |||
| AXIA Energia Nordeste | BONGI | MG 230 kV BONGI MG1 PE | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RBNIA | REA 12074/2022 | R$49,135.97 | 6/1/2025 | Prevista | T2022-032 | Módulo de Infraestrutura de Manobra (69KV - BPT) para o 5º transformador trifásico | 4T25 | |||
| AXIA Energia Nordeste | BONGI | MG 230 kV BONGI MG1 PE | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RBNIA | REA 12074/2022 | R$547,261.53 | 6/1/2025 | Prevista | T2022-032 | Recapacitação de trechos dos barramentos de 230 kV e 69 kV | 4T25 | |||
| AXIA Energia Nordeste | BONGI | MG 230 kV BONGI MG1 PE | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RBNIA | REA 12074/2022 | R$497,449.33 | 6/1/2025 | Prevista | T2022-032 | Substituição do seccionamento no barramento de 69 kV | 4T25 | |||
| AXIA Energia Nordeste | BONGI | MG 230 kV BONGI MG1 PE | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RBNIA | REA 12074/2022 | R$150,062.26 | 6/1/2025 | Prevista | T2022-032 | Substituição de chaves seccionadoras no barramento de 230 kV | 4T25 | |||
| AXIA Energia Nordeste | BONGI | MG 230 kV BONGI MG1 PE | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/17/2021 | 7/16/2039 | R$238,804.11 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BONGI | MC 69 kV TT 69/13,8 kV BONGI TA2 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | MC 69 kV TT 69/13,8 kV BONGI TA2 PE | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/14/2022 | 1/13/2050 | R$60,755.75 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | MC 69 kV TT 69/13,8 kV BONGI TA1 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | MC 69 kV TT 69/13,8 kV BONGI TA1 PE | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/20/2021 | 9/19/2049 | R$31,152.96 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | MC 69 kV TT 69/0 kV BONGI TA3 PE | DIT | 061/2001 | IPCA | RCDM | REA 12074/2022 | 8/26/2024 | 8/25/2054 | R$38,065.96 | 6/1/2025 | Ativa | T2022-032 | Instalação de um módulo de conexão para o transformador de aterramento | |||
| AXIA Energia Nordeste | BONGI | MC 69 kV TR 69/13,8 kV BONGI TR1-A PE TR1-A/TR1-B | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | MC 69 kV TR 69/13,8 kV BONGI TR1-A PE TR1-A/TR1-B | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/5/2022 | 4/22/2050 | R$17,988.29 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BONGI | MC 69 kV TR 230/69 kV BONGI TR5 PE | RBF | FT TR 230/69 kV BONGI TR5 PE | 061/2001 | IPCA | RBNI | REA 12074/2022 | 11/5/2024 | 11/4/2052 | R$645,761.07 | 6/1/2025 | Ativa | T2022-032 | Instalar, na SE BONGI, um módulo de conexão, em 69 kV, para o transformador trifásico TR5 230/69 kV - 200 MVA, arranjo Barra Principal e Transferência. | ||
| AXIA Energia Nordeste | BONGI | MC 69 kV TR 230/69 kV BONGI TR4 PE | RBF | FT TR 230/69 kV BONGI TR4 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | MC 69 kV TR 230/69 kV BONGI TR4 PE | RBF | FT TR 230/69 kV BONGI TR4 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | MC 69 kV TR 230/69 kV BONGI TR3 PE | RBF | FT TR 230/69 kV BONGI TR3 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | MC 69 kV TR 230/69 kV BONGI TR3 PE | RBF | FT TR 230/69 kV BONGI TR3 PE | 061/2001 | IPCA | RBNI | REA 2040/2009 | 1/29/2014 | 2/25/2047 | R$31,755.11 | 6/1/2025 | Ativa | Substituição de disjuntor 12T3. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BONGI | MC 69 kV TR 230/69 kV BONGI TR3 PE | RBF | FT TR 230/69 kV BONGI TR3 PE | 061/2001 | IPCA | RBNIA | REA 12074/2022 | R$597,789.01 | 6/1/2025 | Prevista | T2022-032 | MÓDULO DE MANOBRA - Conexão de transformador (69KV - BPT - LADO 69KV) para o transformador TR3 | ||||
| AXIA Energia Nordeste | BONGI | MC 69 kV TR 230/69 kV BONGI TR3 PE | RBF | FT TR 230/69 kV BONGI TR3 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/8/2019 | 9/12/2047 | R$38,574.95 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BONGI | MC 69 kV TR 230/69 kV BONGI TR2 PE | RBF | FT TR 230/69 kV BONGI TR2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | MC 69 kV TR 230/69 kV BONGI TR2 PE | RBF | FT TR 230/69 kV BONGI TR2 PE | 061/2001 | IPCA | RBNI | REA 2040/2009 | 3/28/2014 | 4/24/2047 | R$31,915.90 | 6/1/2025 | Ativa | Substituição de disjuntor 12T2. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BONGI | MC 69 kV TR 230/69 kV BONGI TR2 PE | RBF | FT TR 230/69 kV BONGI TR2 PE | 061/2001 | IPCA | RBNIA | REA 12074/2022 | R$597,789.01 | 6/1/2025 | Prevista | T2022-032 | MÓDULO DE MANOBRA - Conexão de transformador (69KV - BPT - LADO 69KV) para o transformador TR2 | 3T25 | |||
| AXIA Energia Nordeste | BONGI | MC 69 kV TR 230/69 kV BONGI TR2 PE | RBF | FT TR 230/69 kV BONGI TR2 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/22/2018 | 10/21/2047 | R$61,070.38 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BONGI | MC 69 kV TR 230/69 kV BONGI TR1 PE | RBF | FT TR 230/69 kV BONGI TR1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | MC 69 kV TR 230/69 kV BONGI TR1 PE | RBF | FT TR 230/69 kV BONGI TR1 PE | 061/2001 | IPCA | RBNI | REA 2040/2009 | 2/12/2014 | 3/11/2047 | R$31,793.92 | 6/1/2025 | Ativa | Substituição de disjuntor 12T1. Incluída no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BONGI | MC 69 kV TR 230/69 kV BONGI TR1 PE | RBF | FT TR 230/69 kV BONGI TR1 PE | 061/2001 | IPCA | RBNI | REA 12074/2022 | 4/28/2025 | 4/27/2053 | R$597,789.01 | 6/1/2025 | Ativa | T2022-032 | MÓDULO DE MANOBRA - Conexão de transformador (69KV - BPT - LADO 69KV) para o transformador TR1 | ||
| AXIA Energia Nordeste | BONGI | MC 69 kV TR 230/69 kV BONGI TR1 PE | RBF | FT TR 230/69 kV BONGI TR1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/7/2018 | 8/5/2047 | R$40,443.30 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BONGI | MC 69 kV BC 69 kV 20,3 Mvar BONGI BC1 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | MC 69 kV BC 69 kV 20,3 Mvar BONGI BC1 PE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | MC 69 kV BC 69 kV 20,3 Mvar BONGI BC1 PE | DIT | 061/2001 | IPCA | RCDM | REA 5861/2016 | 3/27/2015 | 3/26/2043 | R$16,663.39 | 6/1/2025 | Ativa | Ativação do ERAC no Banco de Capacitores de 69 kV da SE * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | MC 69 kV BC 69 kV 20,3 Mvar BONGI BC1 PE | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/18/2020 | 3/2/2049 | R$95,975.57 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | MC 230 kV TR 230/69 kV BONGI TR5 PE | RBF | FT TR 230/69 kV BONGI TR5 PE | 061/2001 | IPCA | RBNI | REA 12074/2022 | 11/5/2024 | 11/4/2052 | R$ 1,579,392.02 | 6/1/2025 | Ativa | T2022-032 | Instalar, na SE BONGI, um módulo de conexão, em 230 kV, para o transformador trifásico TR5 230/69 kV - 200 MVA, arranjo Barra Principal e Transferência. | ||
| AXIA Energia Nordeste | BONGI | MC 230 kV TR 230/69 kV BONGI TR4 PE | RBF | FT TR 230/69 kV BONGI TR4 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | MC 230 kV TR 230/69 kV BONGI TR4 PE | RBF | FT TR 230/69 kV BONGI TR4 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$410,719.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | MC 230 kV TR 230/69 kV BONGI TR4 PE | RBF | FT TR 230/69 kV BONGI TR4 PE | 061/2001 | IPCA | RMEL | REN 443/2011 | 6/4/2017 | 6/7/2047 | R$4,423.95 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE ISOLADORES DE VIDRO POR PORCELANA, EM ATENDIMENTO A RECOMENDAÇÃO RAP ONS 0053/2013, DA CHAVE SECCIONADORA, POSIÇÃO 34T4-6 DA SE BONGI * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BONGI | MC 230 kV TR 230/69 kV BONGI TR4 PE | RBF | FT TR 230/69 kV BONGI TR4 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/19/2022 | 11/9/2041 | R$210,802.22 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BONGI | MC 230 kV TR 230/69 kV BONGI TR3 PE | RBF | FT TR 230/69 kV BONGI TR3 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | MC 230 kV TR 230/69 kV BONGI TR3 PE | RBF | FT TR 230/69 kV BONGI TR3 PE | 061/2001 | IPCA | RBNIA | REA 12074/2022 | R$ 1,465,712.01 | 6/1/2025 | Prevista | T2022-032 | MÓDULO DE MANOBRA - Conexão de transformador (230KV - BPT - LADO 230KV) para o transformador TR3 | ||||
| AXIA Energia Nordeste | BONGI | MC 230 kV TR 230/69 kV BONGI TR3 PE | RBF | FT TR 230/69 kV BONGI TR3 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/6/2021 | 12/20/2042 | R$297,153.93 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BONGI | MC 230 kV TR 230/69 kV BONGI TR2 PE | RBF | FT TR 230/69 kV BONGI TR2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | MC 230 kV TR 230/69 kV BONGI TR2 PE | RBF | FT TR 230/69 kV BONGI TR2 PE | 061/2001 | IPCA | RBNIA | REA 12074/2022 | R$ 1,465,712.01 | 6/1/2025 | Prevista | T2022-032 | MÓDULO DE MANOBRA - Conexão de transformador (230KV - BPT - LADO 230KV) para o transformador TR2 | 3T25 | |||
| AXIA Energia Nordeste | BONGI | MC 230 kV TR 230/69 kV BONGI TR2 PE | RBF | FT TR 230/69 kV BONGI TR2 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/23/2021 | 10/25/2042 | R$275,186.93 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BONGI | MC 230 kV TR 230/69 kV BONGI TR1 PE | RBF | FT TR 230/69 kV BONGI TR1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | MC 230 kV TR 230/69 kV BONGI TR1 PE | RBF | FT TR 230/69 kV BONGI TR1 PE | 061/2001 | IPCA | RBNI | REA 12074/2022 | 4/28/2025 | 4/27/2053 | R$ 1,465,712.01 | 6/1/2025 | Ativa | T2022-032 | MÓDULO DE MANOBRA - Conexão de transformador (230KV - BPT - LADO 230KV) para o transformador TR1 | ||
| AXIA Energia Nordeste | BONGI | MC 230 kV TR 230/69 kV BONGI TR1 PE | RBF | FT TR 230/69 kV BONGI TR1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/23/2021 | 12/28/2042 | R$280,669.68 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BONGI | MC 230 kV TR 230/13,8 kV BONGI TR7 PE | RBF | FT TR 230/13,8 kV BONGI TR7 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | MC 230 kV TR 230/13,8 kV BONGI TR7 PE | RBF | FT TR 230/13,8 kV BONGI TR7 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/13/2022 | 2/25/2050 | R$94,053.23 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BONGI | MC 230 kV TR 230/13,8 kV BONGI TR6 PE | RBF | FT TR 230/13,8 kV BONGI TR6 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | MC 230 kV TR 230/13,8 kV BONGI TR6 PE | RBF | FT TR 230/13,8 kV BONGI TR6 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 2/16/2014 | 2/24/2045 | R$51,879.19 | 6/1/2025 | Ativa | SUBSTITUIÇAO DOS TC NISSIN 94T6 FASES A/B/C. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BONGI | MC 230 kV TR 230/13,8 kV BONGI TR6 PE | RBF | FT TR 230/13,8 kV BONGI TR6 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$410,719.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | MC 230 kV TR 230/13,8 kV BONGI TR6 PE | RBF | FT TR 230/13,8 kV BONGI TR6 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/18/2020 | 2/15/2045 | R$26,664.98 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BONGI | MC 230 kV TR 230/13,8 kV BONGI TR5 PE | RBF | FT TR 230/13,8 kV BONGI TR5 PE | 061/2001 | IPCA | RBNI | REA 3402/2012 | 1/14/2016 | 5/6/2048 | R$950,126.32 | 6/1/2025 | Ativa | T2012-021 | Instalar, na SE Bongi, um módulo de conexão, em 230 kV, arranjo barra principal e transferência, para o terceiro transformador 230/13,8 kV - 40 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BONGI | MC 13,8 kV TR 69/13,8 kV BONGI TR1-A PE TR1-A/TR1-B | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$48,477.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | MC 13,8 kV TR 230/13,8 kV BONGI TR7 PE | RBF | FT TR 230/13,8 kV BONGI TR7 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | MC 13,8 kV TR 230/13,8 kV BONGI TR6 PE | RBF | FT TR 230/13,8 kV BONGI TR6 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | MC 13,8 kV TR 230/13,8 kV BONGI TR5 PE | RBF | FT TR 230/13,8 kV BONGI TR5 PE | 061/2001 | IPCA | RBNI | REA 3402/2012 | 1/14/2016 | 6/14/2047 | R$309,587.22 | 6/1/2025 | Ativa | T2012-021 | Instalar, na SE Bongi, um módulo de conexão, em 13,8 kV, arranjo barra principal e transferência, para o terceiro transformador 230/13,8 kV - 40 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | BONGI | MC 13,8 kV TR 13,8/0,22 kV BONGI TR3 PE | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | MC 13,8 kV TR 13,8/0,22 kV BONGI TR2 PE | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | IB 69 kV MG 230 kV BONGI MG1 PE IB2 | DIT | 061/2001 | IPCA | RCDM | REA 12074/2022 | 8/26/2024 | 8/25/2057 | R$209,001.30 | 6/1/2025 | Ativa | T2022-032 | Obra de Substituição Completa - Substituição da unidade de Interligação de Barramento IB2 em 69 kV, BPT. | |||
| AXIA Energia Nordeste | BONGI | IB 69 kV MG 230 kV BONGI MG1 PE IB1 | DIT | 061/2001 | IPCA | RCDM | REA 12074/2022 | 8/26/2024 | 8/25/2057 | R$209,001.30 | 6/1/2025 | Ativa | T2022-032 | Obra de Substituição Completa - Substituição da unidade de Interligação de Barramento IB1 em 69 kV, BPT. | |||
| AXIA Energia Nordeste | BONGI | IB 230 kV MG 230 kV BONGI MG1 PE IB1 | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,837.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | IB 230 kV MG 230 kV BONGI MG1 PE IB1 | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RMEL | REN 443/2011 | 7/26/2017 | 7/29/2047 | R$ 319.11 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DO SISTEMA DE MONITORAMENTO DA CHAVE SECCIONADORA, POSIÇÃO 34D1-1 DA SUB BONGI * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BONGI | IB 230 kV MG 230 kV BONGI MG1 PE IB1 | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RMEL | REN 443/2011 | 7/26/2017 | 7/29/2047 | R$ 319.11 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DO SISTEMA DE MONITORAMENTO DA CHAVE SECCIONADORA, POSIÇÃO 34D1-2 DA SUB BONGI * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BONGI | IB 230 kV MG 230 kV BONGI MG1 PE IB1 | RB | FT MG 230 kV BONGI MG1 PE | 061/2001 | IPCA | RBNIA | REA 12074/2022 | R$561,659.36 | 6/1/2025 | Prevista | T2022-032 | Substituição de disjuntor e chaves seccionadoras no IB de 230 kV | 4T25 | |||
| AXIA Energia Nordeste | BONGI | IB 13,8 kV MG 230 kV BONGI MG1 PE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$30,696.61 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | IB 13,8 kV MG 230 kV BONGI MG1 PE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$86,139.86 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI VARZEA 02J4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI VARZEA 02J4 | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 11/18/2013 | 12/15/2046 | R$31,555.03 | 6/1/2025 | Ativa | Substituição DJ Superado - 12J4. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI VARZEA 02J4 | DIT | 061/2001 | IPCA | RCDM | REA 2376/2010 | 9/14/2014 | 9/16/2044 | R$26,760.35 | 6/1/2025 | Ativa | Substituição da seccionadora 32J4-4,32J4-5 E 32J4-6.Incluído no reajuste ciclo 2015-2016 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI VARZEA 02J4 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI VARZEA 02J4 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI VARZEA 02J4 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/13/2022 | 3/12/2050 | R$49,627.29 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI VARZEA 02J3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI VARZEA 02J3 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 2/25/2014 | 3/24/2047 | R$31,829.97 | 6/1/2025 | Ativa | Substituição de disjuntor 12J3. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI VARZEA 02J3 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 5/27/2015 | 5/26/2030 | R$ 318.67 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J3-4.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI VARZEA 02J3 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 5/28/2015 | 5/27/2030 | R$ 318.73 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J3-7.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI VARZEA 02J3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI VARZEA 02J3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI VARZEA 02J3 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/31/2021 | 7/5/2050 | R$79,633.84 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI TAMARIN 02J2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI TAMARIN 02J2 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 5/26/2015 | 5/25/2030 | R$ 318.61 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J2-4.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI TAMARIN 02J2 | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 12/12/2013 | 1/8/2047 | R$31,621.57 | 6/1/2025 | Ativa | Substituição DJ Superado - 12J2 no módulo de entrada de linha para Tamarineira. Receita incluída após recurso da REH 2.258/2017. Reajuste 2017-2018. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI TAMARIN 02J2 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 4/18/2016 | 4/21/2046 | R$ 739.61 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI TAMARIN 02J2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/28/2020 | 4/10/2049 | R$91,066.73 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI RIO JORDAO 02J5 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI RIO JORDAO 02J5 | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 12/12/2013 | 1/8/2047 | R$31,621.57 | 6/1/2025 | Ativa | Substituição DJ Superado - 12J5. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI RIO JORDAO 02J5 | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 8/3/2014 | 8/5/2044 | R$13,155.17 | 6/1/2025 | Ativa | Substituição TC Superado - 92J52-A e C.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI RIO JORDAO 02J5 | DIT | 061/2001 | IPCA | RCDM | REA 2376/2010 | 9/14/2014 | 9/16/2044 | R$26,760.35 | 6/1/2025 | Ativa | Substituição da seccionadora 32J5-4,32J5-5, 32J5-6.Incluído no reajuste ciclo 2015-2016 . *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI RIO JORDAO 02J5 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/21/2022 | 7/17/2049 | R$54,272.16 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI RETIRO 02J1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI RETIRO 02J1 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 1/30/2013 | 1/29/2046 | R$29,287.00 | 6/1/2025 | Ativa | Substituição de disjuntor 12J1, autorizada pela REA 2040/2009. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI RETIRO 02J1 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 5/25/2015 | 5/24/2030 | R$ 318.55 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J1-7.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI RETIRO 02J1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI RETIRO 02J1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/17/2021 | 8/2/2050 | R$55,009.46 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI IMBIRI 02L2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI IMBIRI 02L2 | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 1/30/2013 | 1/29/2046 | R$29,287.00 | 6/1/2025 | Ativa | Substituição de disjuntor 12L2, autorizada pela REA 1814/2009. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI IMBIRI 02L2 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI IMBIRI 02L2 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI IMBIRI 02L2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/23/2021 | 1/20/2050 | R$90,647.57 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI IMBIRI 02L1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI IMBIRI 02L1 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 5/28/2015 | 5/30/2045 | R$ 494.85 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32L1-4.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI IMBIRI 02L1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/27/2022 | 12/21/2050 | R$83,638.49 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI GAZ-PORT 02L6 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI GAZ-PORT 02L6 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/16/2022 | 9/10/2049 | R$58,798.25 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI GAZ-PINA 02J7 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI GAZ-PINA 02J7 | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 11/1/2013 | 11/28/2046 | R$31,507.90 | 6/1/2025 | Ativa | Substituição DJ Superado - 12J7. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI GAZ-PINA 02J7 | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 9/27/2014 | 9/29/2044 | R$13,224.03 | 6/1/2025 | Ativa | Substituição TC Superado - 92J72-A E C.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI GAZ-PINA 02J7 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/25/2022 | 7/26/2049 | R$57,655.41 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI GAZ 02L5 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 69 kV BONGI GAZ 02L5 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/11/2021 | 2/22/2050 | R$91,211.38 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-3 PE | RB | FT LT 230 kV BONGI /JOAIRAM C-3 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-3 PE | RB | FT LT 230 kV BONGI /JOAIRAM C-3 PE | 061/2001 | IPCA | RMEL | REN 443/2011 | 4/8/2016 | 4/11/2046 | R$1,577.94 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BONGI | EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-3 PE | RB | FT LT 230 kV BONGI /JOAIRAM C-3 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/20/2019 | 6/18/2050 | R$239,182.02 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BONGI | EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-2 PE | RB | FT LT 230 kV BONGI /JOAIRAM C-2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-2 PE | RB | FT LT 230 kV BONGI /JOAIRAM C-2 PE | 061/2001 | IPCA | RMEL | REN 443/2011 | 4/8/2016 | 4/11/2046 | R$1,208.48 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BONGI | EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-2 PE | RB | FT LT 230 kV BONGI /JOAIRAM C-2 PE | 061/2001 | IPCA | RMEL | REN 443/2011 | 12/10/2017 | 12/26/2050 | R$109,080.72 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE DISJUNTOR, POSIÇÃO 14V5 DA SUB BONGI * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BONGI | EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-2 PE | RB | FT LT 230 kV BONGI /JOAIRAM C-2 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/1/2021 | 9/2/2048 | R$63,722.39 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BONGI | EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-1 PE | RB | FT LT 230 kV BONGI /JOAIRAM C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | BONGI | EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-1 PE | RB | FT LT 230 kV BONGI /JOAIRAM C-1 PE | 061/2001 | IPCA | RMEL | REN 443/2011 | 4/7/2016 | 4/10/2046 | R$1,577.80 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BONGI | EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-1 PE | RB | FT LT 230 kV BONGI /JOAIRAM C-1 PE | 061/2001 | IPCA | RMEL | REN 443/2011 | 11/19/2017 | 12/5/2050 | R$108,902.49 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE DISJUNTOR, POSIÇÃO 14V4 DA SUB BONGI * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BONGI | EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-1 PE | RB | FT LT 230 kV BONGI /JOAIRAM C-1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/9/2021 | 8/2/2047 | R$45,500.16 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BONGI | EL 230 kV BONGI LT 230 kV BONGI /ACONORTE C-1 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 230 kV BONGI LT 230 kV BONGI /ACONORTE C-1 PE | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/8/2021 | 3/16/2049 | R$71,012.71 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 230 kV BONGI LT 230 kV BONGI /ACONORTE C-1 PE | DIT | 061/2001 | IPCA | RCDM | REA 5861/2016 | 2/23/2014 | 2/22/2029 | R$5,940.85 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE SISTEMAS DE PROTEÇÃO E PAINÉIS ASSOCIADOS EM 01 TERMINAL DE LINHA DE TRANSMISSÃO LT 04C1. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | EL 13,8 kV BONGI DIST9 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 13,8 kV BONGI DIST8 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 13,8 kV BONGI DIST7 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 13,8 kV BONGI DIST6 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 13,8 kV BONGI DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 13,8 kV BONGI DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 13,8 kV BONGI DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 13,8 kV BONGI DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 13,8 kV BONGI DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 13,8 kV BONGI DIS11 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | EL 13,8 kV BONGI DIS10 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | BC 69 kV 20,3 Mvar BONGI BC1 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$107,937.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | BONGI | BC 69 kV 20,3 Mvar BONGI BC1 PE | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/29/2013 | 11/28/2033 | R$80,619.95 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS CAPACITORES DE ASCAREL FABRICADO POR INDUCON MODELO FPA2 69KV 02H1.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | BONGI | BC 69 kV 20,3 Mvar BONGI BC1 PE | DIT | 061/2001 | IPCA | RCDM | REA 7761/2019 | 4/6/2018 | 4/5/2038 | R$28,351.40 | 6/1/2025 | Ativa | Instalação de reatores limitadores de curto-circuito entre o banco de capacitor 02H1 e o respectivo disjuntor de manobra, 12H1. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. GERAL | TR 230/34,5 kV BRAS. GERAL TRR1 DF | RBF | FT TR 230/34,5 kV BRAS. GERAL TRR1 DF | 062/2001 | IPCA | RBNI | REA 3231/2011 | 12/10/2013 | 1/31/2045 | R$976,313.04 | 6/1/2025 | Ativa | T2011-176 | Instalar, na SE Brasília Geral, um autotransformador trifásico 230/34,5 kV, de 60 MVA, com finalidade de reserva fria. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BRAS. GERAL | TR 230/34,5 kV BRAS. GERAL TR5 DF | RBF | FT TR 230/34,5 kV BRAS. GERAL TR5 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$262,568.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. GERAL | TR 230/34,5 kV BRAS. GERAL TR4 DF | RBF | FT TR 230/34,5 kV BRAS. GERAL TR4 DF | 062/2001 | IPCA | RBNI | REA 2367/2010 | 11/29/2012 | 5/21/2042 | R$ 1,075,783.59 | 6/1/2025 | Ativa | T2009-100 | Obra de Substituição Completa - substituir os bancos de autotransformadores monofásicos 230/34,5/13,8 kV - 30 MVA por um banco de autotransformadores monofásicos 230/34,5/13,8 kV - 60 MVA. RAP corrigida de modo a considerar a Receita autorizada total do equipamento novo. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BRAS. GERAL | TR 230/34,5 kV BRAS. GERAL TR2 DF | RBF | FT TR 230/34,5 kV BRAS. GERAL TR2 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$262,568.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. GERAL | TR 230/34,5 kV BRAS. GERAL TR1 DF | RBF | FT TR 230/34,5 kV BRAS. GERAL TR1 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$262,568.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| VSB | BRAS. GERAL | MG 230 kV BRAS. GERAL MG2 DF | RB | FT MG 230 kV BRAS. GERAL MG2 DF | 014/2013 | IPCA | RBL | CC 014/2013 | 4/27/2017 | 10/9/2043 | R$200,821.10 | 6/1/2025 | Ativa | T2014-015-C | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia | BRAS. GERAL | MG 230 kV BRAS. GERAL MG1 DF | RB | FT MG 230 kV BRAS. GERAL MG1 DF | 062/2001 | IPCA | RBNI | REA 3893/2013 | 7/30/2014 | 11/12/2040 | R$210,114.13 | 6/1/2025 | Ativa | T2013-003 | Complementação do módulo geral da subestação Brasília Geral com um módulo de infraestrutura de manobra 230 kV, arranjo anel, e um módulo de infraestrutura de manobra 34,5 kV, arranjo barra principal e transferência. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BRAS. GERAL | MG 230 kV BRAS. GERAL MG1 DF | RB | FT MG 230 kV BRAS. GERAL MG1 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$531,934.38 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. GERAL | MG 230 kV BRAS. GERAL MG1 DF | RB | FT MG 230 kV BRAS. GERAL MG1 DF | 062/2001 | IPCA | RBNI | REA 5012/2015 | 5/6/2021 | 1/31/2049 | R$ 1,454,226.57 | 6/1/2025 | Ativa | T2014-095 | Complementação do módulo geral da Subestação Brasília Geral com 19 módulos de infraestrutura de manobra em 34,5 kV. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BRAS. GERAL | MG 230 kV BRAS. GERAL MG1 DF | RB | FT MG 230 kV BRAS. GERAL MG1 DF | 062/2001 | IPCA | RBNI | REA 5012/2015 | 5/6/2021 | 3/20/2050 | R$747,616.03 | 6/1/2025 | Ativa | T2014-095 | Complementação do módulo geral da subestação Brasília Geral com adequações do sistema de serviços auxiliares e ampliação da casa de comando. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BRAS. GERAL | MG 230 kV BRAS. GERAL MG1 DF | RB | FT MG 230 kV BRAS. GERAL MG1 DF | 062/2001 | IPCA | RBNI | REN 643/2014 | 6/29/2013 | 2/20/2037 | R$154,723.36 | 6/1/2025 | Ativa | Instalação de proteção diferencial de barras 34,5 kV. Reforço considerado no recurso de reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. GERAL | MG 230 kV BRAS. GERAL MG1 DF | RB | FT MG 230 kV BRAS. GERAL MG1 DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,041,232.86 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. GERAL | MG 230 kV BRAS. GERAL MG1 DF | RB | FT MG 230 kV BRAS. GERAL MG1 DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,188,310.90 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. GERAL | MG 230 kV BRAS. GERAL MG1 DF | RB | FT MG 230 kV BRAS. GERAL MG1 DF | 062/2001 | IPCA | RBNI | REA 7761/2019 | 9/20/2021 | 9/19/2038 | R$94,824.74 | 6/1/2025 | Ativa | Serviço auxiliar de corrente alternada (CA) da subestação. Modernização para automatismo do grupo Motor-Gerador. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. GERAL | MG 230 kV BRAS. GERAL MG1 DF | RB | FT MG 230 kV BRAS. GERAL MG1 DF | 062/2001 | IPCA | RBNI | REA 7761/2019 | 10/27/2021 | 10/26/2038 | R$24,632.40 | 6/1/2025 | Ativa | Serviço auxiliar de corrente contínua (CC) de Sistema de Proteção e Controle * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. GERAL | MG 230 kV BRAS. GERAL MG1 DF | RB | FT MG 230 kV BRAS. GERAL MG1 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 8/30/2016 | 8/29/2033 | R$124,569.62 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. GERAL | MC 34,5 kV TR3 DISPONIVEL | RBF | FT TR 230/34,5 kV BRAS. GERAL TR3D DF | 062/2001 | IPCA | RBNI | REA 5012/2015 | 2/21/2020 | 6/19/2047 | R$640,064.28 | 6/1/2025 | Ativa | T2014-095 | Obra de Substituição Completa - Substituição do módulo de conexão do transformador TR3 em 34,5 kV, arranjo barra dupla a cinco chaves, por um módulo de conexão de transformador em 34,5 kV, arranjo barra dupla a quatro chaves. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BRAS. GERAL | MC 34,5 kV TR3 DISPONIVEL | RBF | FT TR 230/34,5 kV BRAS. GERAL TR3D DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/20/2021 | 10/19/2054 | R$170,783.04 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. GERAL | MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR5 DF | RBF | FT TR 230/34,5 kV BRAS. GERAL TR5 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$67,452.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. GERAL | MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR5 DF | RBF | FT TR 230/34,5 kV BRAS. GERAL TR5 DF | 062/2001 | IPCA | RBNI | REA 5012/2015 | 1/27/2020 | 10/5/2047 | R$273,808.60 | 6/1/2025 | Ativa | T2014-095 | Remanejamento do módulo de conexão do transformador TR5 em 34,5 kV, arranjo barra dupla a quatro chaves. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BRAS. GERAL | MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR5 DF | RBF | FT TR 230/34,5 kV BRAS. GERAL TR5 DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$258,842.20 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. GERAL | MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR5 DF | RBF | FT TR 230/34,5 kV BRAS. GERAL TR5 DF | 062/2001 | IPCA | RBNI | REA 4068/2013 | 12/7/2017 | 4/6/2048 | R$34,279.92 | 6/1/2025 | Ativa | Substituição de 03 transformadores de corrente do módulo de conexão do TR05 - 34,5 kV * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 * Receita alterada no recurso contra a REH 2.407/2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. GERAL | MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR5 DF | RBF | FT TR 230/34,5 kV BRAS. GERAL TR5 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/31/2023 | 2/2/2053 | R$66,580.49 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. GERAL | MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR4 DF | RBF | FT TR 230/34,5 kV BRAS. GERAL TR4 DF | 062/2001 | IPCA | RBNI | REA 5012/2015 | 2/21/2020 | 6/19/2047 | R$640,064.28 | 6/1/2025 | Ativa | T2014-095 | Obra de Substituição Completa - Substituição do módulo de conexão do transformador TR4 em 34,5 kV, arranjo barra dupla a cinco chaves, por um módulo de conexão de transformador em 34,5 kV, arranjo barra dupla a quatro chaves. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BRAS. GERAL | MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR2 DF | RBF | FT TR 230/34,5 kV BRAS. GERAL TR2 DF | 062/2001 | IPCA | RBNI | REA 5012/2015 | 9/11/2020 | 1/8/2048 | R$649,789.35 | 6/1/2025 | Ativa | T2014-095 | Obra de Substituição Completa - Substituição do módulo de conexão do transformador TR2 em 34,5 kV, arranjo barra dupla a cinco chaves, por um módulo de conexão de transformador em 34,5 kV, arranjo barra dupla a quatro chaves. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BRAS. GERAL | MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR1 DF | RBF | FT TR 230/34,5 kV BRAS. GERAL TR1 DF | 062/2001 | IPCA | RBNI | REA 5012/2015 | 10/1/2020 | 1/7/2047 | R$519,812.33 | 6/1/2025 | Ativa | T2014-095 | Obra de Substituição Completa - Substituição do módulo de conexão do transformador TR1 em 34,5 kV, arranjo barra dupla a cinco chaves, por um módulo de conexão de transformador em 34,5 kV, arranjo barra dupla a quatro chaves. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BRAS. GERAL | MC 230 kV TR 230/34,5 kV BRAS. GERAL TRR1 DF | RBF | FT TR 230/34,5 kV BRAS. GERAL TRR1 DF | 062/2001 | IPCA | RBNI | REA 3893/2013 | 7/30/2014 | 1/10/2043 | R$815,791.03 | 6/1/2025 | Ativa | T2013-003 | Instalação, na subestação Brasília Geral, de um módulo de conexão 230 kV, arranjo anel, para o 5º transformador 230/34,5 kV, de 60 MVA. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BRAS. GERAL | MC 230 kV TR 230/34,5 kV BRAS. GERAL TRR1 DF | RBF | FT TR 230/34,5 kV BRAS. GERAL TRR1 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/10/2015 | 1/9/2039 | R$26,771.22 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. GERAL | MC 230 kV TR 230/34,5 kV BRAS. GERAL TR5 DF | RBF | FT TR 230/34,5 kV BRAS. GERAL TR5 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$138,788.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. GERAL | MC 230 kV TR 230/34,5 kV BRAS. GERAL TR5 DF | RBF | FT TR 230/34,5 kV BRAS. GERAL TR5 DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$532,584.92 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. GERAL | MC 230 kV TR 230/34,5 kV BRAS. GERAL TR5 DF | RBF | FT TR 230/34,5 kV BRAS. GERAL TR5 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/22/2021 | 12/28/2051 | R$42,158.87 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. GERAL | MC 230 kV TR 230/34,5 kV BRAS. GERAL TR4 DF | RBF | FT TR 230/34,5 kV BRAS. GERAL TR4 DF | 062/2001 | IPCA | RBNI | REA 2367/2010 | 11/29/2012 | 12/24/2031 | R$15,874.21 | 6/1/2025 | Ativa | T2009-100 | adequar o módulo de conexão 230 kV para atender ao novo banco de autotransformadores 230/34,5/13,8 kV - 60 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BRAS. GERAL | MC 230 kV TR 230/34,5 kV BRAS. GERAL TR4 DF | RBF | FT TR 230/34,5 kV BRAS. GERAL TR4 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$138,788.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. GERAL | MC 230 kV TR 230/34,5 kV BRAS. GERAL TR4 DF | RBF | FT TR 230/34,5 kV BRAS. GERAL TR4 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 4/27/2018 | 1/31/2047 | R$497,529.31 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. GERAL | MC 230 kV TR 230/34,5 kV BRAS. GERAL TR2 DF | RBF | FT TR 230/34,5 kV BRAS. GERAL TR2 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$138,788.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. GERAL | MC 230 kV TR 230/34,5 kV BRAS. GERAL TR2 DF | RBF | FT TR 230/34,5 kV BRAS. GERAL TR2 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/26/2021 | 12/29/2052 | R$184,318.68 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. GERAL | MC 230 kV TR 230/34,5 kV BRAS. GERAL TR1 DF | RBF | FT TR 230/34,5 kV BRAS. GERAL TR1 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$138,788.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. GERAL | MC 230 kV TR 230/34,5 kV BRAS. GERAL TR1 DF | RBF | FT TR 230/34,5 kV BRAS. GERAL TR1 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/16/2022 | 2/8/2052 | R$124,842.80 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. GERAL | IB 34,5 kV MG 230 kV BRAS. GERAL MG1 DF IB4 | DIT | 062/2001 | IPCA | RCDM | REA 5012/2015 | 12/23/2020 | 11/9/2048 | R$505,377.76 | 6/1/2025 | Ativa | T2014-095 | Instalação de um módulo de seccionamento de barra em 34,5 kV, denominado IB4. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. GERAL | IB 34,5 kV MG 230 kV BRAS. GERAL MG1 DF IB3 | DIT | 062/2001 | IPCA | RCDM | REA 5012/2015 | 12/23/2020 | 11/9/2048 | R$505,377.75 | 6/1/2025 | Ativa | T2014-095 | Instalação de um módulo de seccionamento de barra em 34,5 kV, denominado IB3. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. GERAL | IB 34,5 kV MG 230 kV BRAS. GERAL MG1 DF IB2 | DIT | 062/2001 | IPCA | RCDM | REA 5012/2015 | 12/23/2020 | 5/17/2050 | R$733,913.25 | 6/1/2025 | Ativa | T2014-095 | Instalação de um módulo de interligação de barras em 34,5 kV, denominado IB2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. GERAL | IB 34,5 kV MG 230 kV BRAS. GERAL MG1 DF IB1 | DIT | 062/2001 | IPCA | RCDM | REA 5012/2015 | 12/23/2020 | 5/8/2050 | R$673,028.21 | 6/1/2025 | Ativa | T2014-095 | Obra de Substituição Completa - Substituição de um módulo de interligação de barras em 34,5 kV, denominado IB1. *(Receita revisada em 03/07/2024) | |||
| VSB | BRAS. GERAL | IB 230 kV MG 230 kV BRAS. GERAL MG2 DF IB3 | RB | FT MG 230 kV BRAS. GERAL MG2 DF | 014/2013 | IPCA | RBL | CC 014/2013 | 4/27/2017 | 10/9/2043 | R$318,996.66 | 6/1/2025 | Ativa | T2014-015-C | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia | BRAS. GERAL | IB 230 kV MG 230 kV BRAS. GERAL MG1 DF IB2 | RB | FT MG 230 kV BRAS. GERAL MG1 DF | 062/2001 | IPCA | RBNI | REA 2367/2010 | 3/6/2013 | 10/31/2040 | R$596,447.09 | 6/1/2025 | Ativa | T2009-077 | Instalar um módulo de interligação de barramentos 230 kV para permitir a evolução do arranjo anel para dois anéis subjacentes. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BRAS. GERAL | IB 230 kV MG 230 kV BRAS. GERAL MG1 DF IB2 | RB | FT MG 230 kV BRAS. GERAL MG1 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/11/2014 | 11/13/2044 | R$32,365.80 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. GERAL | EL 34,5 kV BRAS. GERAL DIST9 | DIT | 062/2001 | IPCA | RCDM | REA 5012/2015 | 3/19/2020 | 12/29/2045 | R$697,697.20 | 6/1/2025 | Ativa | T2014-095 | Obra de Substituição Completa - Substituição de um módulo de entrada de linha em 34,5 kV, arranjo barra principal e transferência, por um módulo de entrada de linha em 34,5 kV, arranjo barra dupla a quatro chaves, destinado a conexão da linha de distribuição 34,5 kV Brasília Geral - Guará C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. GERAL | EL 34,5 kV BRAS. GERAL DIST8 | DIT | 062/2001 | IPCA | RCDM | REA 5012/2015 | 3/19/2020 | 11/27/2045 | R$691,237.57 | 6/1/2025 | Ativa | T2014-095 | Obra de Substituição Completa - Substituição de um módulo de entrada de linha em 34,5 kV, arranjo barra principal e transferência, por um módulo de entrada de linha em 34,5 kV, arranjo barra dupla a quatro chaves, destinado a conexão da linha de distribuição 34,5 kV Brasília Geral - SE 01 C3. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. GERAL | EL 34,5 kV BRAS. GERAL DIST7 | DIT | 062/2001 | IPCA | RCDM | REA 5012/2015 | 9/3/2020 | 5/14/2046 | R$700,398.47 | 6/1/2025 | Ativa | T2014-095 | Obra de Substituição Completa - Substituição de um módulo de entrada de linha em 34,5 kV, arranjo barra principal e transferência, por um módulo de entrada de linha em 34,5 kV, arranjo barra dupla a quatro chaves, destinado a conexão da linha de distribuição 34,5 kV Brasília Geral - SE 01 C2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. GERAL | EL 34,5 kV BRAS. GERAL DIST6 | DIT | 062/2001 | IPCA | RCDM | REA 5012/2015 | 8/28/2020 | 5/8/2046 | R$700,071.31 | 6/1/2025 | Ativa | T2014-095 | Obra de Substituição Completa - Substituição de um módulo de entrada de linha em 34,5 kV, arranjo barra principal e transferência, por um módulo de entrada de linha em 34,5 kV, arranjo barra dupla a quatro chaves, destinado a conexão da linha de distribuição 34,5 kV Brasília Geral - SE 01 C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. GERAL | EL 34,5 kV BRAS. GERAL DIST5 | DIT | 062/2001 | IPCA | RCDM | REA 5012/2015 | 3/19/2020 | 11/27/2045 | R$691,237.58 | 6/1/2025 | Ativa | T2014-095 | Obra de Substituição Completa - Substituição de um módulo de entrada de linha em 34,5 kV, arranjo barra principal e transferência, por um módulo de entrada de linha em 34,5 kV, arranjo barra dupla a quatro chaves, destinado a conexão da linha de distribuição 34,5 kV Brasília Geral - SE 02 C3. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. GERAL | EL 34,5 kV BRAS. GERAL DIST4 | DIT | 062/2001 | IPCA | RCDM | REA 5012/2015 | 9/3/2020 | 5/14/2046 | R$700,398.47 | 6/1/2025 | Ativa | T2014-095 | Obra de Substituição Completa - Substituição de um módulo de entrada de linha em 34,5 kV, arranjo barra principal e transferência, por um módulo de entrada de linha em 34,5 kV, arranjo barra dupla a quatro chaves, destinado a conexão da linha de distribuição 34,5 kV Brasília Geral - SE 02 C2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. GERAL | EL 34,5 kV BRAS. GERAL DIST3 | DIT | 062/2001 | IPCA | RCDM | REA 5012/2015 | 8/28/2020 | 5/8/2046 | R$700,071.31 | 6/1/2025 | Ativa | T2014-095 | Obra de Substituição Completa - Substituição de um módulo de entrada de linha em 34,5 kV, arranjo barra principal e transferência, por um módulo de entrada de linha em 34,5 kV, arranjo barra dupla a quatro chaves, destinado a conexão da linha de distribuição 34,5 kV Brasília Geral - SE 02 C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. GERAL | EL 34,5 kV BRAS. GERAL DIST2 | DIT | 062/2001 | IPCA | RCDM | REA 5012/2015 | 12/16/2020 | 8/26/2046 | R$706,069.52 | 6/1/2025 | Ativa | T2014-095 | Obra de Substituição Completa - Substituição de um módulo de entrada de linha em 34,5 kV, arranjo barra principal e transferência, por um módulo de entrada de linha em 34,5 kV, arranjo barra dupla a quatro chaves, destinado a conexão da linha de distribuição 34,5 kV Brasília Geral - SE 08 C2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. GERAL | EL 34,5 kV BRAS. GERAL DIST10 | DIT | 062/2001 | IPCA | RCDM | REA 5012/2015 | 3/19/2020 | 11/27/2045 | R$691,237.57 | 6/1/2025 | Ativa | T2014-095 | Obra de Substituição Completa - Substituição de um módulo de entrada de linha em 34,5 kV, arranjo barra principal e transferência, por um módulo de entrada de linha em 34,5 kV, arranjo barra dupla a quatro chaves, destinado a conexão da linha de distribuição 34,5 kV Brasília Geral - Guará C2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. GERAL | EL 34,5 kV BRAS. GERAL DIST1 | DIT | 062/2001 | IPCA | RCDM | REA 5012/2015 | 12/18/2020 | 8/28/2046 | R$706,178.58 | 6/1/2025 | Ativa | T2014-095 | Obra de Substituição Completa - Substituição de um módulo de entrada de linha em 34,5 kV, arranjo barra principal e transferência, por um módulo de entrada de linha em 34,5 kV, arranjo barra dupla a quatro chaves, destinado a conexão da linha de distribuição 34,5 kV Brasília Geral - SE 08 C1. *(Receita revisada em 03/07/2024) | |||
| VSB | BRAS. GERAL | EL 230 kV BRAS. GERAL LT 230 kV BRAS. GERAL /BRAS. SUL C-3 DF | RB | FT LT 230 kV BRAS. GERAL /BRAS. SUL C-3 DF | 014/2013 | IPCA | RBL | CC 014/2013 | 4/27/2017 | 10/9/2043 | R$511,032.16 | 6/1/2025 | Ativa | T2014-015-C | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia | BRAS. GERAL | EL 230 kV BRAS. GERAL LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF | RB | FT LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$203,013.49 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. GERAL | EL 230 kV BRAS. GERAL LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF | RB | FT LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/22/2021 | 4/29/2043 | R$392,106.12 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. GERAL | EL 230 kV BRAS. GERAL LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF | RB | FT LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$203,013.49 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. GERAL | EL 230 kV BRAS. GERAL LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF | RB | FT LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 9/22/2019 | 7/28/2041 | R$640,259.00 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. SUL | TT 13,8/0,24 kV BRAS. SUL TR09 DF | RBF | FT TR 345/138 kV BRAS. SUL TR8B DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TT 13,8/0,24 kV BRAS. SUL TR08 DF | RBF | FT TR 345/138 kV BRAS. SUL TR8A DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TT 13,8/0,24 kV BRAS. SUL TR07 DF | RBF | FT TR 345/138 kV BRAS. SUL TR7 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TT 13,8/0,12 kV BRAS. SUL TR10 DF | RB | FT TR 345/230 kV BRAS. SUL TR10 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TT 13,8/0,12 kV BRAS. SUL TR06 DF | RB | FT TR 345/230 kV BRAS. SUL TR6 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TT 13,8/0,12 kV BRAS. SUL TR05 DF | RB | FT TR 345/230 kV BRAS. SUL TR9 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TT 13,8/0,12 kV BRAS. SUL TR04 DF | RBF | FT TR 345/138 kV BRAS. SUL TR4 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TT 13,8/0,12 kV BRAS. SUL TR03 DF | RB | FT TR 345/230 kV BRAS. SUL TR3 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TT 13,8/0,12 kV BRAS. SUL TR02 DF | RBF | FT TR 345/138 kV BRAS. SUL TR2 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TT 13,8/0,12 kV BRAS. SUL TR01 DF | RBF | FT TR 345/138 kV BRAS. SUL TR1 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TR 345/230 kV BRAS. SUL TRR2 DF | RB | FT TR 345/230 kV BRAS. SUL TRR2 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$304,360.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TR 345/230 kV BRAS. SUL TRR2 DF | RB | FT TR 345/230 kV BRAS. SUL TRR2 DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,167,947.32 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TR 345/230 kV BRAS. SUL TR9 DF | RB | FT TR 345/230 kV BRAS. SUL TR9 DF | 062/2001 | IPCA | RBNI | REA 2367/2010 | 9/12/2012 | 7/1/2042 | R$ 2,501,342.69 | 6/1/2025 | Ativa | T2009-074 | Instalação do 3º banco de autotransformadores monofásicos 345/230/13,8 kV - 3x 75 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BRAS. SUL | TR 345/230 kV BRAS. SUL TR6 DF | RB | FT TR 345/230 kV BRAS. SUL TR6 DF | 062/2001 | IPCA | RMEL | REA 11449/2022 | 11/14/2024 | 11/13/2059 | R$ 6,019,331.59 | 6/1/2025 | Ativa | T2022-009 | Obra de Substituição Completa - Substituir na SE Bras. Sul o transformador monofásico - TR6 - 345/230 kV - 3x75 MVA por outro de 3x75 MVA. | ||
| AXIA Energia | BRAS. SUL | TR 345/230 kV BRAS. SUL TR3 DF | RB | FT TR 345/230 kV BRAS. SUL TR3 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$913,082.49 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TR 345/230 kV BRAS. SUL TR3 DF | RB | FT TR 345/230 kV BRAS. SUL TR3 DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,503,841.96 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TR 345/230 kV BRAS. SUL TR3 DF | RB | FT TR 345/230 kV BRAS. SUL TR3 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/13/2017 | 11/12/2032 | R$31,578.27 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. SUL | TR 345/230 kV BRAS. SUL TR10 DF | RB | FT TR 345/230 kV BRAS. SUL TR10 DF | 062/2001 | IPCA | RBNI | REA 3814/2012 | 9/2/2014 | 9/1/2045 | R$ 2,926,326.75 | 6/1/2025 | Ativa | T2012-108 | Instalação do 4º banco de autotransformadores monofásicos 345/230 kV, de 3x75 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BRAS. SUL | TR 345/138 kV BRAS. SUL TRR2 DF | RBF | FT TR 345/138 kV BRAS. SUL TRR2 DF | 062/2001 | IPCA | RBNI | REA 3814/2012 | 9/30/2015 | 1/30/2047 | R$864,405.45 | 6/1/2025 | Ativa | T2012-109 | Instalação de um autotransformador monofásico 345/138 kV, de 50 MVA, com finalidade de reserva. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BRAS. SUL | TR 345/138 kV BRAS. SUL TRR2 DF | RBF | FT TR 345/138 kV BRAS. SUL TRR2 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/11/2015 | 3/25/2047 | R$113,469.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. SUL | TR 345/138 kV BRAS. SUL TRR1 DF | RBF | FT TR 345/138 kV BRAS. SUL TRR1 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$237,717.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TR 345/138 kV BRAS. SUL TR8B DF | RBF | FT TR 345/138 kV BRAS. SUL TR8B DF | 062/2001 | IPCA | RBNI | REA 2367/2010 | 9/27/2012 | 8/22/2033 | R$187,106.44 | 6/1/2025 | Ativa | T2009-056 | Contruir novas bases e paredes corta-fogo para instalação definitiva do autotransformador trifásico 345/138/13,8 kV - 150 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BRAS. SUL | TR 345/138 kV BRAS. SUL TR8B DF | RBF | FT TR 345/138 kV BRAS. SUL TR8B DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$713,153.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TR 345/138 kV BRAS. SUL TR8B DF | RBF | FT TR 345/138 kV BRAS. SUL TR8B DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,736,638.71 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TR 345/138 kV BRAS. SUL TR8B DF | RBF | FT TR 345/138 kV BRAS. SUL TR8B DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,933,823.20 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TR 345/138 kV BRAS. SUL TR8A DF | RBF | FT TR 345/138 kV BRAS. SUL TR8A DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$713,153.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TR 345/138 kV BRAS. SUL TR8A DF | RBF | FT TR 345/138 kV BRAS. SUL TR8A DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,736,638.71 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TR 345/138 kV BRAS. SUL TR8A DF | RBF | FT TR 345/138 kV BRAS. SUL TR8A DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,933,823.20 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TR 345/138 kV BRAS. SUL TR7 DF | RBF | FT TR 345/138 kV BRAS. SUL TR7 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$713,153.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TR 345/138 kV BRAS. SUL TR7 DF | RBF | FT TR 345/138 kV BRAS. SUL TR7 DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,736,638.71 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TR 345/138 kV BRAS. SUL TR7 DF | RBF | FT TR 345/138 kV BRAS. SUL TR7 DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,933,823.20 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TR 345/138 kV BRAS. SUL TR4 DF | RBF | FT TR 345/138 kV BRAS. SUL TR4 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$713,153.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TR 345/138 kV BRAS. SUL TR4 DF | RBF | FT TR 345/138 kV BRAS. SUL TR4 DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,736,638.71 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TR 345/138 kV BRAS. SUL TR4 DF | RBF | FT TR 345/138 kV BRAS. SUL TR4 DF | 062/2001 | IPCA | RMELP | DSP 1108/2024 | R$ 1,444,960.73 | 6/1/2025 | Prevista | T2024-102 | Obra de Substituição Parcial: Substituição da fase C do transformador AT04 345/138 kV 50 MVA (nº serie: 58483, cod. mat.: 10182535), na SEBrasília Sul. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia | BRAS. SUL | TR 345/138 kV BRAS. SUL TR2 DF | RBF | FT TR 345/138 kV BRAS. SUL TR2 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$713,153.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TR 345/138 kV BRAS. SUL TR2 DF | RBF | FT TR 345/138 kV BRAS. SUL TR2 DF | 062/2001 | IPCA | RBNI | REA 8707/2020 | 7/29/2022 | 7/6/2057 | R$ 1,115,221.52 | 6/1/2025 | Ativa | T2019-019 | Adequação para aumento de vida útil no Módulo de Equipamento - Banco de Autotransformadores AT02 345/138 kV, 3x50 MVA com a substituição total de seus enrolamentos, isolamentos, buchas e comutadores de tensão sob carga, também estão inclusos os serviços de desmontagem, transporte, montagem, ensaios e comissionamento na Subestação Brasília Sul. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BRAS. SUL | TR 345/138 kV BRAS. SUL TR1 DF | RBF | FT TR 345/138 kV BRAS. SUL TR1 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$713,153.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TR 345/138 kV BRAS. SUL TR1 DF | RBF | FT TR 345/138 kV BRAS. SUL TR1 DF | 062/2001 | IPCA | RMELP | REA 11449/2022 | R$ 4,905,723.54 | 6/1/2025 | Prevista | T2022-002 | Obra de Substituição Completa - Revitalizar na SE Bras. Sul o transformador monofásico - TR1 - 345/138 kV - 3x50 MVA por outro de 3x50 MVA. | 3T25 | |||
| AXIA Energia | BRAS. SUL | TR 13,8/345 kV BRAS. SUL TR1 DF | RB | FT CS 60/-30 MVAr BRAS. SUL CS1 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$307,323.90 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | TR 13,8/345 kV BRAS. SUL TR1 DF | RB | FT CS 60/-30 MVAr BRAS. SUL CS1 DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,179,317.74 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | RTL 345 kV 60 Mvar BRAS. SUL RT3 DF | RB | FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$473,185.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | RTL 345 kV 60 Mvar BRAS. SUL RT3 DF | RB | FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,815,793.02 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | RTL 345 kV 60 Mvar BRAS. SUL RT3 DF | RB | FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,946,627.32 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | RTL 345 kV 20 Mvar BRAS. SUL RTR1 DF | RB | FT RTL 345 kV 20 Mvar BRAS. SUL RTR1 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$157,728.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| VSB | BRAS. SUL | MG 345 kV BRAS. SUL MG2 DF | RB | FT MG 345 kV BRAS. SUL MG2 DF | 014/2013 | IPCA | RBL | CC 014/2013 | 5/6/2016 | 10/9/2043 | R$233,811.35 | 6/1/2025 | Ativa | T2014-015-D | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia | BRAS. SUL | MG 345 kV BRAS. SUL MG1 DF | RB | FT MG 345 kV BRAS. SUL MG1 DF | 062/2001 | IPCA | RBNI | REA 2367/2010 | 9/12/2012 | 8/7/2032 | R$5,382.42 | 6/1/2025 | Ativa | T2009-074 | Complementar o módulo de infraestrutura geral com sistema contra incêndio para um autotransformador conforme retificação dada pela REA 3209/2011. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BRAS. SUL | MG 345 kV BRAS. SUL MG1 DF | RB | FT MG 345 kV BRAS. SUL MG1 DF | 062/2001 | IPCA | RBNI | REA 3814/2012 | 9/2/2014 | 6/13/2040 | R$638,415.86 | 6/1/2025 | Ativa | T2012-108 | Complementação do módulo geral da subestação Brasília Sul com a instalação de um módulo de infraestrutura de manobra 345kV, arranjo barra dupla a cinco chaves, e de um módulo de infraestrutura de manobra 345 kV, arranjo barra dupla a cinco chaves. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BRAS. SUL | MG 345 kV BRAS. SUL MG1 DF | RB | FT MG 345 kV BRAS. SUL MG1 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,496,887.99 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MG 345 kV BRAS. SUL MG1 DF | RB | FT MG 345 kV BRAS. SUL MG1 DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 5,744,123.88 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MG 345 kV BRAS. SUL MG1 DF | RB | FT MG 345 kV BRAS. SUL MG1 DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 6,158,008.29 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MG 345 kV BRAS. SUL MG1 DF | RB | FT MG 345 kV BRAS. SUL MG1 DF | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/31/2017 | 3/27/2033 | R$3,341.31 | 6/1/2025 | Ativa | Substituição dos Servidores do Sistema de Supervisão e Controle Local (SAGE) por obsolescência ou por atualização tecnológica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MG 345 kV BRAS. SUL MG1 DF | RB | FT MG 345 kV BRAS. SUL MG1 DF | 062/2001 | IPCA | RMEL | REN 443/2011 | 4/25/2017 | 10/21/2031 | R$103,848.96 | 6/1/2025 | Ativa | Substituição de MULTIPLEX ADM SDH MULTIPLEX ADM SDH * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MG 345 kV BRAS. SUL MG1 DF | RB | FT MG 345 kV BRAS. SUL MG1 DF | 062/2001 | IPCA | RMEL | REN 443/2011 | 4/25/2017 | 10/21/2031 | R$84,389.32 | 6/1/2025 | Ativa | Substituição de MULTIPLEX ADM SDH MULTIPLEX ADM SDH * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MG 345 kV BRAS. SUL MG1 DF | RB | FT MG 345 kV BRAS. SUL MG1 DF | 062/2001 | IPCA | RMEL | REN 443/2011 | 4/25/2017 | 10/21/2031 | R$72,642.45 | 6/1/2025 | Ativa | Substituição de MULTIPLEX ADM SDH MULTIPLEX ADM SDH * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MG 345 kV BRAS. SUL MG1 DF | RB | FT MG 345 kV BRAS. SUL MG1 DF | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/1/2017 | 12/26/2032 | R$9,485.65 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MG 345 kV BRAS. SUL MG1 DF | RB | FT MG 345 kV BRAS. SUL MG1 DF | 062/2001 | IPCA | RBNI | REA 4347/2013 | 3/22/2019 | 3/21/2034 | R$4,083.59 | 6/1/2025 | Ativa | Substituição de RDP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MG 345 kV BRAS. SUL MG1 DF | RB | FT MG 345 kV BRAS. SUL MG1 DF | 062/2001 | IPCA | RBNI | REA 5861/2016 | 7/28/2021 | 7/31/2036 | R$498,628.18 | 6/1/2025 | Ativa | Barra 230 kV : Substituição da Proteção Diferencial de Barras por proteção adaptativa * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MG 345 kV BRAS. SUL MG1 DF | RB | FT MG 345 kV BRAS. SUL MG1 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/22/2018 | 10/22/2035 | R$887,187.13 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/230 kV BRAS. SUL TR9 DF | RB | FT TR 345/230 kV BRAS. SUL TR9 DF | 062/2001 | IPCA | RBNI | REA 2367/2010 | 9/12/2012 | 4/16/2040 | R$ 1,660,022.21 | 6/1/2025 | Ativa | T2009-074 | Instalação do módulo de conexão de transformador 345 kV, arranjo barra dupla a cinco chaves *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/230 kV BRAS. SUL TR9 DF | RB | FT TR 345/230 kV BRAS. SUL TR9 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2013 | 12/4/2044 | R$132,393.57 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/230 kV BRAS. SUL TR6 DF | RB | FT TR 345/230 kV BRAS. SUL TR6 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/230 kV BRAS. SUL TR6 DF | RB | FT TR 345/230 kV BRAS. SUL TR6 DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,046,877.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/230 kV BRAS. SUL TR6 DF | RB | FT TR 345/230 kV BRAS. SUL TR6 DF | 062/2001 | IPCA | RBNI | REA 4068/2013 | 1/4/2018 | 3/27/2048 | R$77,682.21 | 6/1/2025 | Ativa | Substituição de 03 transformadores de corrente do módulo de conexão do AT06 - 345 kV * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/230 kV BRAS. SUL TR6 DF | RB | FT TR 345/230 kV BRAS. SUL TR6 DF | 062/2001 | IPCA | RBNI | REA 7761/2019 | 5/31/2019 | 5/30/2047 | R$13,258.13 | 6/1/2025 | Ativa | Substituição de relés de proteção banco 345/230/13.8 kV (AT06). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/230 kV BRAS. SUL TR6 DF | RB | FT TR 345/230 kV BRAS. SUL TR6 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/18/2018 | 7/5/2045 | R$120,973.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/230 kV BRAS. SUL TR3 DF | RB | FT TR 345/230 kV BRAS. SUL TR3 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/230 kV BRAS. SUL TR3 DF | RB | FT TR 345/230 kV BRAS. SUL TR3 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/29/2019 | 4/14/2048 | R$217,956.32 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/230 kV BRAS. SUL TR10 DF | RB | FT TR 345/230 kV BRAS. SUL TR10 DF | 062/2001 | IPCA | RBNI | REA 3814/2012 | 9/2/2014 | 8/10/2043 | R$ 1,255,497.74 | 6/1/2025 | Ativa | T2012-108 | Instalação de um módulo de conexão 345 kV, arranjo barra dupla a cinco chaves, para banco de autotransformadores monofásicos 345/230 kV, 3x75 MVA *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/230 kV BRAS. SUL TR10 DF | RB | FT TR 345/230 kV BRAS. SUL TR10 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/3/2018 | 11/15/2043 | R$125,753.28 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/138 kV BRAS. SUL TR8B DF | RBF | FT TR 345/138 kV BRAS. SUL TR8B DF | 062/2001 | IPCA | RBNI | REA 2367/2010 | 9/27/2012 | 10/10/2040 | R$573,026.99 | 6/1/2025 | Ativa | T2009-056 | Realocar o módulo de conexão 345 kV do compensador síncrono que foi remanejado para SE Vitória, para atender ao 6º banco de autotransformadores 345/138/13,8 kV - 150 MVA *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/138 kV BRAS. SUL TR8B DF | RBF | FT TR 345/138 kV BRAS. SUL TR8B DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/138 kV BRAS. SUL TR8B DF | RBF | FT TR 345/138 kV BRAS. SUL TR8B DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,046,877.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/138 kV BRAS. SUL TR8B DF | RBF | FT TR 345/138 kV BRAS. SUL TR8B DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,122,309.01 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/138 kV BRAS. SUL TR8A DF | RBF | FT TR 345/138 kV BRAS. SUL TR8A DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/138 kV BRAS. SUL TR8A DF | RBF | FT TR 345/138 kV BRAS. SUL TR8A DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,046,877.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/138 kV BRAS. SUL TR8A DF | RBF | FT TR 345/138 kV BRAS. SUL TR8A DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,122,309.01 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/138 kV BRAS. SUL TR8A DF | RBF | FT TR 345/138 kV BRAS. SUL TR8A DF | 062/2001 | IPCA | RBNI | REA 4068/2013 | 12/19/2018 | 12/21/2048 | R$97,674.68 | 6/1/2025 | Ativa | Substituição de 3 transformador es de corrente do módulo de conexão do AT08A. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/138 kV BRAS. SUL TR8A DF | RBF | FT TR 345/138 kV BRAS. SUL TR8A DF | 062/2001 | IPCA | RBNI | REA 7761/2019 | 4/4/2021 | 4/3/2049 | R$7,630.46 | 6/1/2025 | Ativa | Substituição dos relés de proteção do banco AT08 345/138/13.8 kV - 150 MVA * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/138 kV BRAS. SUL TR7 DF | RBF | FT TR 345/138 kV BRAS. SUL TR7 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/138 kV BRAS. SUL TR7 DF | RBF | FT TR 345/138 kV BRAS. SUL TR7 DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,046,877.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/138 kV BRAS. SUL TR7 DF | RBF | FT TR 345/138 kV BRAS. SUL TR7 DF | 062/2001 | IPCA | RBNI | REA 4068/2013 | 11/9/2018 | 11/11/2048 | R$97,351.94 | 6/1/2025 | Ativa | Substituição de 3 transformador es de corrente do módulo de conexão do AT07. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/138 kV BRAS. SUL TR7 DF | RBF | FT TR 345/138 kV BRAS. SUL TR7 DF | 062/2001 | IPCA | RBNI | REA 7761/2019 | 5/31/2019 | 5/30/2047 | R$10,347.82 | 6/1/2025 | Ativa | Substituição dos relés de proteção do banco AT07 345/138/13.8 kV - 150 MVA * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/138 kV BRAS. SUL TR4 DF | RBF | FT TR 345/138 kV BRAS. SUL TR4 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/138 kV BRAS. SUL TR4 DF | RBF | FT TR 345/138 kV BRAS. SUL TR4 DF | 062/2001 | IPCA | RBNI | REA 7761/2019 | 4/4/2021 | 4/3/2049 | R$9,363.92 | 6/1/2025 | Ativa | Substituição dos relés de proteção do banco AT04 345/138/13.8 kV - 150 MVA * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/138 kV BRAS. SUL TR4 DF | RBF | FT TR 345/138 kV BRAS. SUL TR4 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/1/2020 | 7/4/2050 | R$288,994.19 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/138 kV BRAS. SUL TR2 DF | RBF | FT TR 345/138 kV BRAS. SUL TR2 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/138 kV BRAS. SUL TR2 DF | RBF | FT TR 345/138 kV BRAS. SUL TR2 DF | 062/2001 | IPCA | RBNI | REA 7761/2019 | 5/31/2019 | 5/30/2047 | R$20,602.30 | 6/1/2025 | Ativa | Substituição dos relés de proteção do banco AT02 345/138/13.8 kV - 150 MVA * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/138 kV BRAS. SUL TR2 DF | RBF | FT TR 345/138 kV BRAS. SUL TR2 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 4/4/2017 | 4/3/2050 | R$219,174.17 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/138 kV BRAS. SUL TR1 DF | RBF | FT TR 345/138 kV BRAS. SUL TR1 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 345 kV TR 345/138 kV BRAS. SUL TR1 DF | RBF | FT TR 345/138 kV BRAS. SUL TR1 DF | 062/2001 | IPCA | RBNI | REA 7761/2019 | 2/18/2017 | 2/17/2045 | R$28,441.14 | 6/1/2025 | Ativa | Substituição de relés de proteção do banco AT01 345/138/13.8 Kv - 150 MVA * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 345 kV RTL 345 kV 60 Mvar BRAS. SUL RT3 DF | RB | FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,441.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 230 kV TR 345/230 kV BRAS. SUL TR9 DF | RB | FT TR 345/230 kV BRAS. SUL TR9 DF | 062/2001 | IPCA | RBNI | REA 2367/2010 | 9/12/2012 | 6/19/2039 | R$170,055.72 | 6/1/2025 | Ativa | T2009-074 | Instalar módulo de conexão de transformador 230 kV, arranjo barra dupla a cinco chaves. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BRAS. SUL | MC 230 kV TR 345/230 kV BRAS. SUL TR9 DF | RB | FT TR 345/230 kV BRAS. SUL TR9 DF | 062/2001 | IPCA | RBNI | REA 4068/2013 | 1/8/2018 | 3/31/2048 | R$60,316.96 | 6/1/2025 | Ativa | Substituição de 03 transformadores de corrente do módulo de conexão do AT05 - 230 kV * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 230 kV TR 345/230 kV BRAS. SUL TR9 DF | RB | FT TR 345/230 kV BRAS. SUL TR9 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/10/2013 | 1/9/2037 | R$24,452.38 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 230 kV TR 345/230 kV BRAS. SUL TR6 DF | RB | FT TR 345/230 kV BRAS. SUL TR6 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$154,583.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 230 kV TR 345/230 kV BRAS. SUL TR6 DF | RB | FT TR 345/230 kV BRAS. SUL TR6 DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$593,194.91 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 230 kV TR 345/230 kV BRAS. SUL TR6 DF | RB | FT TR 345/230 kV BRAS. SUL TR6 DF | 062/2001 | IPCA | RBNI | REA 4068/2013 | 1/4/2018 | 3/27/2048 | R$60,296.58 | 6/1/2025 | Ativa | Substituição de 03 transformadores de corrente do módulo de conexão do AT06 - 230 kV * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 230 kV TR 345/230 kV BRAS. SUL TR6 DF | RB | FT TR 345/230 kV BRAS. SUL TR6 DF | 062/2001 | IPCA | RBNI | REA 7761/2019 | 5/31/2019 | 5/30/2047 | R$9,658.85 | 6/1/2025 | Ativa | Substituição de relés de proteção banco 345/230/13.8 kV (AT06). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 230 kV TR 345/230 kV BRAS. SUL TR6 DF | RB | FT TR 345/230 kV BRAS. SUL TR6 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/17/2017 | 12/16/2041 | R$30,173.07 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 230 kV TR 345/230 kV BRAS. SUL TR3 DF | RB | FT TR 345/230 kV BRAS. SUL TR3 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$154,583.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 230 kV TR 345/230 kV BRAS. SUL TR3 DF | RB | FT TR 345/230 kV BRAS. SUL TR3 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/13/2017 | 11/12/2041 | R$30,065.10 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 230 kV TR 345/230 kV BRAS. SUL TR10 DF | RB | FT TR 345/230 kV BRAS. SUL TR10 DF | 062/2001 | IPCA | RBNI | REA 3814/2012 | 9/2/2014 | 9/24/2043 | R$613,953.88 | 6/1/2025 | Ativa | T2012-108 | Instalação de um módulo de conexão 230 kV, arranjo barra dupla a cinco chaves, para banco de autotransformadores monofásicos 345/230 kV, 3x75 MVA *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BRAS. SUL | MC 230 kV TR 345/230 kV BRAS. SUL TR10 DF | RB | FT TR 345/230 kV BRAS. SUL TR10 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/26/2020 | 1/26/2049 | R$194,780.53 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR8B DF | RBF | FT TR 345/138 kV BRAS. SUL TR8B DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,609.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR8B DF | RBF | FT TR 345/138 kV BRAS. SUL TR8B DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$443,638.10 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR8B DF | RBF | FT TR 345/138 kV BRAS. SUL TR8B DF | 062/2001 | IPCA | RBNI | REA 4068/2013 | 3/1/2018 | 3/3/2048 | R$46,808.29 | 6/1/2025 | Ativa | Substituição de 03 transformadores de corrente do módulo de conexão do AT09 138 kV * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF | RBF | FT TR 345/138 kV BRAS. SUL TR8A DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,609.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF | RBF | FT TR 345/138 kV BRAS. SUL TR8A DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$443,638.10 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF | RBF | FT TR 345/138 kV BRAS. SUL TR8A DF | 062/2001 | IPCA | RBNI | REA 4068/2013 | 12/19/2018 | 12/21/2048 | R$19,495.94 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de conexão do AT08: SC681. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF | RBF | FT TR 345/138 kV BRAS. SUL TR8A DF | 062/2001 | IPCA | RBNI | REA 4068/2013 | 12/19/2018 | 12/21/2048 | R$19,495.94 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de conexão do AT08: SC683. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF | RBF | FT TR 345/138 kV BRAS. SUL TR8A DF | 062/2001 | IPCA | RBNI | REA 4068/2013 | 12/19/2018 | 12/21/2048 | R$19,495.94 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de conexão do AT08: SC685. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF | RBF | FT TR 345/138 kV BRAS. SUL TR8A DF | 062/2001 | IPCA | RBNI | REA 4068/2013 | 12/19/2018 | 12/21/2048 | R$19,495.94 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de conexão do AT08: SC687. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF | RBF | FT TR 345/138 kV BRAS. SUL TR8A DF | 062/2001 | IPCA | RBNI | REA 4068/2013 | 12/19/2018 | 12/21/2048 | R$19,495.94 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de conexão do AT08: SC689. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF | RBF | FT TR 345/138 kV BRAS. SUL TR8A DF | 062/2001 | IPCA | RBNI | REA 4068/2013 | 12/19/2018 | 12/21/2048 | R$59,222.65 | 6/1/2025 | Ativa | Substituição de 03 transformadores de corrente do módulo de conexão do AT08. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF | RBF | FT TR 345/138 kV BRAS. SUL TR8A DF | 062/2001 | IPCA | RBNI | REA 7761/2019 | 4/4/2021 | 4/3/2049 | R$7,630.46 | 6/1/2025 | Ativa | Substituição dos relés de proteção do banco AT08 345/138/13.8 kV - 150 MVA * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR7 DF | RBF | FT TR 345/138 kV BRAS. SUL TR7 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,609.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR7 DF | RBF | FT TR 345/138 kV BRAS. SUL TR7 DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$443,638.10 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR7 DF | RBF | FT TR 345/138 kV BRAS. SUL TR7 DF | 062/2001 | IPCA | RBNI | REA 4068/2013 | 11/9/2018 | 11/11/2048 | R$59,026.95 | 6/1/2025 | Ativa | Substituição de 03 transformadores de corrente do módulo de conexão do AT07. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR7 DF | RBF | FT TR 345/138 kV BRAS. SUL TR7 DF | 062/2001 | IPCA | RBNI | REA 7761/2019 | 5/31/2019 | 5/30/2047 | R$10,347.82 | 6/1/2025 | Ativa | Substituição dos relés de proteção do banco AT07 345/138/13.8 kV - 150 MVA * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF | RBF | FT TR 345/138 kV BRAS. SUL TR4 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,609.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF | RBF | FT TR 345/138 kV BRAS. SUL TR4 DF | 062/2001 | IPCA | RBNI | REA 4068/2013 | 10/24/2018 | 10/26/2048 | R$19,405.74 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora do módulo de conexão do do AT04: SC 641 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 – 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF | RBF | FT TR 345/138 kV BRAS. SUL TR4 DF | 062/2001 | IPCA | RBNI | REA 4068/2013 | 10/24/2018 | 10/26/2048 | R$19,405.74 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora do módulo de conexão do do AT04: SC 643 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 – 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF | RBF | FT TR 345/138 kV BRAS. SUL TR4 DF | 062/2001 | IPCA | RBNI | REA 4068/2013 | 10/24/2018 | 10/26/2048 | R$19,405.74 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora do módulo de conexão do do AT04: SC 645 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 – 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF | RBF | FT TR 345/138 kV BRAS. SUL TR4 DF | 062/2001 | IPCA | RBNI | REA 4068/2013 | 10/24/2018 | 10/26/2048 | R$19,405.74 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora do módulo de conexão do do AT04: SC 647 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 – 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF | RBF | FT TR 345/138 kV BRAS. SUL TR4 DF | 062/2001 | IPCA | RBNI | REA 4068/2013 | 10/24/2018 | 10/26/2048 | R$19,405.74 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora do módulo de conexão do do AT04: SC 649 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 – 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF | RBF | FT TR 345/138 kV BRAS. SUL TR4 DF | 062/2001 | IPCA | RBNI | REA 7761/2019 | 4/4/2021 | 4/3/2049 | R$12,853.31 | 6/1/2025 | Ativa | Substituição dos relés de proteção do banco AT04 345/138/13.8 kV - 150 MVA * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF | RBF | FT TR 345/138 kV BRAS. SUL TR2 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,609.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF | RBF | FT TR 345/138 kV BRAS. SUL TR2 DF | 062/2001 | IPCA | RBNI | REA 4068/2013 | 3/17/2017 | 8/8/2046 | R$45,455.08 | 6/1/2025 | Ativa | Substituição de 03 transformadores de corrente do módulo de conexão do AT02 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF | RBF | FT TR 345/138 kV BRAS. SUL TR2 DF | 062/2001 | IPCA | RMEL | REN 443/2011 | 4/5/2017 | 9/27/2046 | R$21,576.86 | 6/1/2025 | Ativa | Substituição de 1 seccionadora (SC621 - CT AT02) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF | RBF | FT TR 345/138 kV BRAS. SUL TR2 DF | 062/2001 | IPCA | RMEL | REN 443/2011 | 4/5/2017 | 9/27/2046 | R$21,576.86 | 6/1/2025 | Ativa | Substituição de 1 seccionadora (SC623 - CT AT02) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF | RBF | FT TR 345/138 kV BRAS. SUL TR2 DF | 062/2001 | IPCA | RMEL | REN 443/2011 | 4/5/2017 | 9/27/2046 | R$21,576.86 | 6/1/2025 | Ativa | Substituição de 1 seccionadora (SC625 - CT AT02) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF | RBF | FT TR 345/138 kV BRAS. SUL TR2 DF | 062/2001 | IPCA | RMEL | REN 443/2011 | 4/5/2017 | 9/27/2046 | R$21,576.86 | 6/1/2025 | Ativa | Substituição de 1 seccionadora (SC627 - CT AT02) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF | RBF | FT TR 345/138 kV BRAS. SUL TR2 DF | 062/2001 | IPCA | RMEL | REN 443/2011 | 4/5/2017 | 9/27/2046 | R$21,576.86 | 6/1/2025 | Ativa | Substituição de 1 seccionadora (SC629 - CT AT02) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF | RBF | FT TR 345/138 kV BRAS. SUL TR2 DF | 062/2001 | IPCA | RBNI | REA 7761/2019 | 5/31/2019 | 5/30/2047 | R$28,279.60 | 6/1/2025 | Ativa | Substituição dos relés de proteção do banco AT02 345/138/13.8 kV - 150 MVA * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF | RBF | FT TR 345/138 kV BRAS. SUL TR1 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,609.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF | RBF | FT TR 345/138 kV BRAS. SUL TR1 DF | 062/2001 | IPCA | RBNI | REA 4068/2013 | 3/17/2017 | 8/8/2046 | R$23,035.59 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de conexão do AT01: SC611 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF | RBF | FT TR 345/138 kV BRAS. SUL TR1 DF | 062/2001 | IPCA | RBNI | REA 4068/2013 | 3/17/2017 | 8/8/2046 | R$23,035.59 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de conexão do AT01: SC613 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF | RBF | FT TR 345/138 kV BRAS. SUL TR1 DF | 062/2001 | IPCA | RMEL | REN 443/2011 | 2/21/2017 | 6/15/2046 | R$21,498.37 | 6/1/2025 | Ativa | Substituição de 1 seccionadora (SC615 - CT AT01) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF | RBF | FT TR 345/138 kV BRAS. SUL TR1 DF | 062/2001 | IPCA | RMEL | REN 443/2011 | 2/21/2017 | 6/15/2046 | R$21,498.37 | 6/1/2025 | Ativa | Substituição de 1 seccionadora (SC617 - CT AT01) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF | RBF | FT TR 345/138 kV BRAS. SUL TR1 DF | 062/2001 | IPCA | RMEL | REN 443/2011 | 2/21/2017 | 6/15/2046 | R$21,498.37 | 6/1/2025 | Ativa | Substituição de 1 seccionadora (SC619 - CT AT01) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF | RBF | FT TR 345/138 kV BRAS. SUL TR1 DF | 062/2001 | IPCA | RBNI | REA 7761/2019 | 2/18/2017 | 2/17/2045 | R$20,719.98 | 6/1/2025 | Ativa | Substituição de relés de proteção do banco AT01 345/138/13.8 Kv - 150 MVA * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | MC 13,8 kV TT 13,8/0,24 kV BRAS. SUL TR09 DF | RBF | FT TR 345/138 kV BRAS. SUL TR8B DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 13,8 kV TT 13,8/0,24 kV BRAS. SUL TR08 DF | RBF | FT TR 345/138 kV BRAS. SUL TR8A DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 13,8 kV TT 13,8/0,24 kV BRAS. SUL TR07 DF | RBF | FT TR 345/138 kV BRAS. SUL TR7 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 13,8 kV TT 13,8/0,12 kV BRAS. SUL TR10 DF | RB | FT TR 345/230 kV BRAS. SUL TR10 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 13,8 kV TT 13,8/0,12 kV BRAS. SUL TR06 DF | RB | FT TR 345/230 kV BRAS. SUL TR6 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 13,8 kV TT 13,8/0,12 kV BRAS. SUL TR05 DF | RB | FT TR 345/230 kV BRAS. SUL TR9 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 13,8 kV TT 13,8/0,12 kV BRAS. SUL TR04 DF | RBF | FT TR 345/138 kV BRAS. SUL TR4 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 13,8 kV TT 13,8/0,12 kV BRAS. SUL TR03 DF | RB | FT TR 345/230 kV BRAS. SUL TR3 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 13,8 kV TT 13,8/0,12 kV BRAS. SUL TR02 DF | RBF | FT TR 345/138 kV BRAS. SUL TR2 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 13,8 kV TT 13,8/0,12 kV BRAS. SUL TR01 DF | RBF | FT TR 345/138 kV BRAS. SUL TR1 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 13,8 kV CS 60/-30 Mvar BRAS. SUL CS1 DF | RB | FT CS 60/-30 MVAr BRAS. SUL CS1 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 13,8 kV BC 13,8 kV 15 Mvar BRAS. SUL BC4 DF | RBF | FT BC 13,8 kV 15 Mvar BRAS. SUL BC4 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$68,943.38 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 13,8 kV BC 13,8 kV 15 Mvar BRAS. SUL BC3 DF | RBF | FT BC 13,8 kV 15 Mvar BRAS. SUL BC3 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$68,943.38 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 13,8 kV BC 13,8 kV 15 Mvar BRAS. SUL BC2 DF | RBF | FT BC 13,8 kV 15 Mvar BRAS. SUL BC2 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$68,943.38 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | MC 13,8 kV BC 13,8 kV 15 Mvar BRAS. SUL BC1 DF | RBF | FT BC 13,8 kV 15 Mvar BRAS. SUL BC1 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$68,943.38 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | IB 345 kV MG 345 kV BRAS. SUL MG1 DF IB1 | RB | FT MG 345 kV BRAS. SUL MG1 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | IB 345 kV MG 345 kV BRAS. SUL MG1 DF IB1 | RB | FT MG 345 kV BRAS. SUL MG1 DF | 062/2001 | IPCA | RBNI | REA 4068/2013 | 8/30/2015 | 4/26/2047 | R$447,310.34 | 6/1/2025 | Ativa | Remanejar um módulo de interligação de barras 345 kV, arranjo barra dupla a cinco chaves. Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | IB 345 kV MG 345 kV BRAS. SUL MG1 DF IB1 | RB | FT MG 345 kV BRAS. SUL MG1 DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$928,957.53 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | IB 230 kV MG 345 kV BRAS. SUL MG1 DF IB1 | RB | FT MG 345 kV BRAS. SUL MG1 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$127,017.00 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | IB 230 kV MG 345 kV BRAS. SUL MG1 DF IB1 | RB | FT MG 345 kV BRAS. SUL MG1 DF | 062/2001 | IPCA | RBNI | REA 5484/2015 | 4/22/2019 | 4/21/2052 | R$159,849.75 | 6/1/2025 | Ativa | Substituição de 1 disjuntor do vão Amarre (DJ704). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | IB 230 kV MG 345 kV BRAS. SUL MG1 DF IB1 | RB | FT MG 345 kV BRAS. SUL MG1 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/31/2023 | 2/2/2053 | R$83,057.11 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. SUL | IB 138 kV MG 345 kV BRAS. SUL MG1 DF IB1 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$92,690.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | BRAS. SUL | IB 138 kV MG 345 kV BRAS. SUL MG1 DF IB1 | DIT | 062/2001 | IPCA | RCDM | REA 4068/2013 | 11/21/2017 | 12/13/2047 | R$23,721.30 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora do módulo de interligação de barras: SC 601 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | IB 138 kV MG 345 kV BRAS. SUL MG1 DF IB1 | DIT | 062/2001 | IPCA | RCDM | REA 4068/2013 | 11/21/2017 | 12/13/2047 | R$23,721.30 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora do módulo de interligação de barras: SC 603 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 345 kV BRAS. SUL LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | RB | FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | EL 345 kV BRAS. SUL LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | RB | FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | 062/2001 | IPCA | RMEL | REN 643/2014 | 9/17/2015 | 10/24/2036 | R$51,249.26 | 6/1/2025 | Ativa | Revitalização Necessária: Troca de proteções - LT B. Sul Corumbá PMI 2012-2015 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | EL 345 kV BRAS. SUL LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | RB | FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,229,990.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | EL 345 kV BRAS. SUL LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | RB | FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,318,615.67 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | EL 345 kV BRAS. SUL LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | RB | FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | 062/2001 | IPCA | RBNI | REA 4347/2013 | 3/22/2019 | 3/21/2034 | R$4,083.59 | 6/1/2025 | Ativa | Substituição de RDP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| VSB | BRAS. SUL | EL 345 kV BRAS. SUL LT 345 kV BRAS. SUL /SAMAMBAIA C-3 DF | RB | FT LT 345 kV BRAS. SUL /SAMAMBAIA C-3 DF | 014/2013 | IPCA | RBL | CC 014/2013 | 5/6/2016 | 10/9/2043 | R$871,557.78 | 6/1/2025 | Ativa | T2014-015-D | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia | BRAS. SUL | EL 345 kV BRAS. SUL LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF | RB | FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | EL 345 kV BRAS. SUL LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF | RB | FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF | 062/2001 | IPCA | RBNI | REA 4347/2013 | 3/22/2019 | 3/21/2034 | R$4,083.59 | 6/1/2025 | Ativa | Substituição de RDP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | EL 345 kV BRAS. SUL LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF | RB | FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/12/2014 | 2/12/2033 | R$543,820.21 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. SUL | EL 345 kV BRAS. SUL LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF | RB | FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | EL 345 kV BRAS. SUL LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF | RB | FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF | 062/2001 | IPCA | RBNI | REA 4347/2013 | 3/22/2019 | 3/21/2034 | R$4,083.59 | 6/1/2025 | Ativa | Substituição de RDP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | EL 345 kV BRAS. SUL LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF | RB | FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 8/26/2014 | 11/14/2033 | R$483,762.13 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. SUL | EL 230 kV BRAS. SUL LT 230 kV BRAS. SUL /PIRINEUS C-1 DF/GO | RB | FT LT 230 kV BRAS. SUL /PIRINEUS C-1 DF/GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$215,593.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| VSB | BRAS. SUL | EL 230 kV BRAS. SUL LT 230 kV BRAS. GERAL /BRAS. SUL C-3 DF | RB | FT LT 230 kV BRAS. GERAL /BRAS. SUL C-3 DF | 014/2013 | IPCA | RBL | CC 014/2013 | 4/27/2017 | 10/9/2043 | R$540,539.49 | 6/1/2025 | Ativa | T2014-015-C | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia | BRAS. SUL | EL 230 kV BRAS. SUL LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF | RB | FT LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$215,593.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | EL 230 kV BRAS. SUL LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF | RB | FT LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF | 062/2001 | IPCA | RBNI | REA 3814/2012 | 4/22/2014 | 7/25/2042 | R$770,621.68 | 6/1/2025 | Ativa | T2012-108 | Adequação de um módulo de entrada de linha 230 kV, arranjo barra dupla a cinco chaves, para conexão da Linha de Transmissão 230 kV Brasília Geral - Brasília Sul C2 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | BRAS. SUL | EL 230 kV BRAS. SUL LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF | RB | FT LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/11/2014 | 11/13/2044 | R$13,440.07 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. SUL | EL 230 kV BRAS. SUL LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF | RB | FT LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$215,593.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | EL 230 kV BRAS. SUL LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF | RB | FT LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF | 062/2001 | IPCA | RBNI | REA 4068/2013 | 11/7/2018 | 8/4/2051 | R$199,493.59 | 6/1/2025 | Ativa | Substituição de 1 disjuntor (7424) do módulo de entrada da LT 230 kV Brasília Geral - Brasília Sul C1, remanejado do módulo de entrada da LT 230 kV Brasília Geral - Brasília Sul C2. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | EL 230 kV BRAS. SUL LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF | RB | FT LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/20/2014 | 9/4/2030 | R$354,149.49 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | BRAS. SUL | EL 230 kV BRAS. SUL LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF | RB | FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$215,593.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | EL 230 kV BRAS. SUL LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF | RB | FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF | 062/2001 | IPCA | RBNI | REA 4068/2013 | 11/7/2018 | 11/6/2051 | R$157,857.10 | 6/1/2025 | Ativa | Substituição de 01 disjuntor (7414) (7514) do módulo de entrada da LT 230 kV Brasília Sul - Águas Lindas. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST9 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST9 | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$647,926.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST9 | DIT | 062/2001 | IPCA | RCDM | REA 4068/2013 | 10/24/2018 | 10/26/2048 | R$58,948.67 | 6/1/2025 | Ativa | Substituição de 03 transformadores de corrente do módulo de entrada da LD 138 kV Brasília Sul - Santa Maria * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 – 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST9 | DIT | 062/2001 | IPCA | RCDM | REA 7761/2019 | 4/7/2021 | 4/6/2049 | R$102,833.32 | 6/1/2025 | Ativa | Substituição dos relés de proteção do circuito para Santa Maria * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST9 | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/31/2019 | 10/9/2051 | R$184,072.79 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST7 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST7 | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$647,926.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST7 | DIT | 062/2001 | IPCA | RCDM | REA 4068/2013 | 3/17/2017 | 8/8/2046 | R$43,355.60 | 6/1/2025 | Ativa | Substituição de 03 transformadores de corrente do módulo de entrada da LD 138 kV Brasília Sul - Ceilândia Sul C2 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST7 | DIT | 062/2001 | IPCA | RCDM | REA 7761/2019 | 4/4/2021 | 4/3/2049 | R$131,523.67 | 6/1/2025 | Ativa | Substituição dos relés de proteção do circuito 2 para Ceilândia Sul * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST6 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST6 | DIT | 062/2001 | IPCA | RCDM | REA 4068/2013 | 12/22/2016 | 2/13/2046 | R$43,039.66 | 6/1/2025 | Ativa | Substituição de 03 transformadores de corrente do módulo de entrada da LD 138 kV Brasília Sul - Ceilândia Sul C1 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST6 | DIT | 062/2001 | IPCA | RCDM | REA 7761/2019 | 4/4/2021 | 4/3/2049 | R$28,715.67 | 6/1/2025 | Ativa | Substituição dos relés de proteção do circuito 1 para Ceilândia Sul * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST5 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST5 | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 5/24/2017 | 12/15/2046 | R$30,146.72 | 6/1/2025 | Ativa | Substituição de 1 seccionadora (SC6859/6850T- EL Taguatinga C2) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST5 | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 5/24/2017 | 12/15/2046 | R$20,801.24 | 6/1/2025 | Ativa | Substituição de 1 seccionadora (SC6855 - EL Taguatinga C2) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST5 | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 5/24/2017 | 12/15/2046 | R$20,801.24 | 6/1/2025 | Ativa | Substituição de 1 seccionadora (SC6857 - EL Taguatinga C2) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST5 | DIT | 062/2001 | IPCA | RCDM | REA 4068/2013 | 5/24/2017 | 12/15/2046 | R$22,377.23 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de entrada da LD 138 kV Brasília Sul - Taguatinga C2: SC6851 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 * Receita alterada no recurso contra a REH 2.407/2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST5 | DIT | 062/2001 | IPCA | RCDM | REA 4068/2013 | 5/24/2017 | 12/15/2046 | R$22,377.23 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de entrada da LD 138 kV Brasília Sul - Taguatinga C2: SC6853 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 * Receita alterada no recurso contra a REH 2.407/2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST5 | DIT | 062/2001 | IPCA | RCDM | REA 7761/2019 | 4/4/2021 | 4/3/2049 | R$28,715.67 | 6/1/2025 | Ativa | Substituição dos relés de proteção do circuito 2 para Taguatinga * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST4 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST4 | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 4/10/2017 | 10/2/2046 | R$30,032.94 | 6/1/2025 | Ativa | Substituição de 1 seccionadora (SC6849/6840T - EL Taguatinga C1) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST4 | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 4/10/2017 | 10/2/2046 | R$20,722.72 | 6/1/2025 | Ativa | Substituição de 1 seccionadora (SC6845 - EL Taguatinga C1) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST4 | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 4/10/2017 | 10/2/2046 | R$20,722.72 | 6/1/2025 | Ativa | Substituição de 1 seccionadora (SC6847 - EL Taguatinga C1) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST4 | DIT | 062/2001 | IPCA | RCDM | REA 4068/2013 | 4/25/2017 | 10/17/2046 | R$22,322.39 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de entrada da LD 138 kV Brasília Sul - Taguatinga C1: SC6841 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST4 | DIT | 062/2001 | IPCA | RCDM | REA 4068/2013 | 4/25/2017 | 10/17/2046 | R$22,322.39 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de entrada da LD 138 kV Brasília Sul - Taguatinga C1: SC6843 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST4 | DIT | 062/2001 | IPCA | RCDM | REA 7761/2019 | 4/4/2021 | 4/3/2049 | R$28,715.67 | 6/1/2025 | Ativa | Substituição dos relés de proteção do circuito 1 para Taguatinga * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST3 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST3 | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 7/26/2017 | 4/18/2047 | R$30,306.42 | 6/1/2025 | Ativa | Substituição de 1 seccionadora (SC6839/6830T - EL Brasília Norte C3) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST3 | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 7/26/2017 | 4/18/2047 | R$20,911.42 | 6/1/2025 | Ativa | Substituição de 1 seccionadora (SC6835 - EL Brasília Norte C3) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST3 | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 7/26/2017 | 4/18/2047 | R$20,911.42 | 6/1/2025 | Ativa | Substituição de 1 seccionadora (SC6837 - EL Brasília Norte C3) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST3 | DIT | 062/2001 | IPCA | RCDM | REA 4068/2013 | 8/7/2017 | 5/30/2047 | R$22,516.48 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de entrada da LD 138 kV Brasília Sul - Brasília Norte C3: SC6831 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 * Receita incluída no recurso contra a REH 2.407/2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST3 | DIT | 062/2001 | IPCA | RCDM | REA 4068/2013 | 8/7/2017 | 5/30/2047 | R$22,516.48 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de entrada da LD 138 kV Brasília Sul - Brasília Norte C3: SC6833 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 * Receita incluída no recurso contra a REH 2.407/2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST3 | DIT | 062/2001 | IPCA | RCDM | REA 7761/2019 | 4/4/2021 | 4/3/2049 | R$28,715.67 | 6/1/2025 | Ativa | Substituição dos relés de proteção do circuito 3 para Brasília Norte * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST2 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST2 | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 5/3/2017 | 11/24/2046 | R$30,091.01 | 6/1/2025 | Ativa | Substituição de 1 seccionadora (SC 6829/6820T - EL Brasília Norte C2) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST2 | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 5/3/2017 | 11/24/2046 | R$20,762.80 | 6/1/2025 | Ativa | Substituição de 1 seccionadora (SC6825 - EL Brasília Norte C2) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST2 | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 5/3/2017 | 11/24/2046 | R$20,762.80 | 6/1/2025 | Ativa | Substituição de 1 seccionadora (SC6827 - EL Brasília Norte C2) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST2 | DIT | 062/2001 | IPCA | RCDM | REA 4068/2013 | 5/3/2017 | 11/24/2046 | R$22,335.87 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de entrada da LD 138 kV Brasília Sul - Brasília Norte C2: SC6821 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019* Receita alterada no recurso contra a REH 2.407/2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST2 | DIT | 062/2001 | IPCA | RCDM | REA 4068/2013 | 5/3/2017 | 11/24/2046 | R$22,335.87 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de entrada da LD 138 kV Brasília Sul - Brasília Norte C2: SC6823 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 * Receita alterada no recurso contra a REH 2.407/2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST2 | DIT | 062/2001 | IPCA | RCDM | REA 4068/2013 | 5/3/2017 | 11/24/2046 | R$43,523.00 | 6/1/2025 | Ativa | Substituição de 03 transformadores de corrente do módulo de entrada da linha 138 kV Brasília Sul - Brasília Norte C2 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 * Receita alterada no recurso contra a REH 2.407/2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST2 | DIT | 062/2001 | IPCA | RCDM | REA 7761/2019 | 4/4/2021 | 4/3/2049 | R$28,715.67 | 6/1/2025 | Ativa | Substituição dos relés de proteção do circuito 2 para Brasília Norte * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST1 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST1 | DIT | 062/2001 | IPCA | RCDM | REA 4068/2013 | 8/21/2017 | 6/13/2047 | R$43,928.16 | 6/1/2025 | Ativa | Substituição de 03 transformadores de corrente do módulo de entrada da LD 138 kV Brasília Sul - Brasília Norte C1 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 * Receita alterada no recurso contra a REH 2.407/2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | EL 138 kV BRAS. SUL DIST1 | DIT | 062/2001 | IPCA | RCDM | REA 7761/2019 | 4/4/2021 | 4/3/2049 | R$28,715.67 | 6/1/2025 | Ativa | Substituição dos relés de proteção do circuito 1 para Brasília Norte * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | BRAS. SUL | CS 60/-30 Mvar BRAS. SUL CS1 DF | RB | FT CS 60/-30 MVAr BRAS. SUL CS1 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$935,232.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | BC 13,8 kV 15 Mvar BRAS. SUL BC4 DF | RBF | FT BC 13,8 kV 15 Mvar BRAS. SUL BC4 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$81,807.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | BC 13,8 kV 15 Mvar BRAS. SUL BC3 DF | RBF | FT BC 13,8 kV 15 Mvar BRAS. SUL BC3 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$81,807.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | BC 13,8 kV 15 Mvar BRAS. SUL BC2 DF | RBF | FT BC 13,8 kV 15 Mvar BRAS. SUL BC2 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$81,807.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | BRAS. SUL | BC 13,8 kV 15 Mvar BRAS. SUL BC1 DF | RBF | FT BC 13,8 kV 15 Mvar BRAS. SUL BC1 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$81,807.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| VSB | BRASILIA LESTE | TR 500/138 kV BRASILIA LESTE TRR1 DF | RBF | FT TR 500/138 kV BRASILIA LESTE TRR1 DF | 014/2013 | IPCA | RBL | CC 014/2013 | 2/19/2018 | 10/9/2043 | R$ 1,417,081.75 | 6/1/2025 | Ativa | T2014-015-A | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| VSB | BRASILIA LESTE | TR 500/138 kV BRASILIA LESTE TR2 DF | RBF | FT TR 500/138 kV BRASILIA LESTE TR2 DF | 014/2013 | IPCA | RBL | CC 014/2013 | 2/19/2018 | 10/9/2043 | R$ 4,096,347.14 | 6/1/2025 | Ativa | T2014-015-B | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| VSB | BRASILIA LESTE | TR 500/138 kV BRASILIA LESTE TR1 DF | RBF | FT TR 500/138 kV BRASILIA LESTE TR1 DF | 014/2013 | IPCA | RBL | CC 014/2013 | 2/19/2018 | 10/9/2043 | R$ 4,251,245.25 | 6/1/2025 | Ativa | T2014-015-A | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| VSB | BRASILIA LESTE | MG 500 kV BRASILIA LESTE MG1 DF | RB | FT MG 500 kV BRASILIA LESTE MG1 DF | 014/2013 | IPCA | RBL | CC 014/2013 | 2/19/2018 | 10/9/2043 | R$ 1,316,540.81 | 6/1/2025 | Ativa | T2014-015-A | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| VSB | BRASILIA LESTE | MC 500 kV TR 500/138 kV BRASILIA LESTE TR2 DF | RBF | FT TR 500/138 kV BRASILIA LESTE TR2 DF | 014/2013 | IPCA | RBL | CC 014/2013 | 2/19/2018 | 10/9/2043 | R$ 1,002,559.06 | 6/1/2025 | Ativa | T2014-015-B | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| VSB | BRASILIA LESTE | MC 500 kV TR 500/138 kV BRASILIA LESTE TR1 DF | RBF | FT TR 500/138 kV BRASILIA LESTE TR1 DF | 014/2013 | IPCA | RBL | CC 014/2013 | 2/19/2018 | 10/9/2043 | R$ 1,040,469.54 | 6/1/2025 | Ativa | T2014-015-A | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| VSB | BRASILIA LESTE | MC 138 kV TR 500/138 kV BRASILIA LESTE TR2 DF | RBF | FT TR 500/138 kV BRASILIA LESTE TR2 DF | 014/2013 | IPCA | RBL | CC 014/2013 | 2/19/2018 | 10/9/2043 | R$279,306.50 | 6/1/2025 | Ativa | T2014-015-B | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| VSB | BRASILIA LESTE | MC 138 kV TR 500/138 kV BRASILIA LESTE TR1 DF | RBF | FT TR 500/138 kV BRASILIA LESTE TR1 DF | 014/2013 | IPCA | RBL | CC 014/2013 | 2/19/2018 | 10/9/2043 | R$289,868.12 | 6/1/2025 | Ativa | T2014-015-A | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| VSB | BRASILIA LESTE | IB 500 kV MG 500 kV BRASILIA LESTE MG1 DF IB2 | RB | FT MG 500 kV BRASILIA LESTE MG1 DF | 014/2013 | IPCA | RBL | CC 014/2013 | 2/19/2018 | 10/9/2043 | R$ 1,066,031.29 | 6/1/2025 | Ativa | T2014-015-B | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| VSB | BRASILIA LESTE | IB 500 kV MG 500 kV BRASILIA LESTE MG1 DF IB1 | RB | FT MG 500 kV BRASILIA LESTE MG1 DF | 014/2013 | IPCA | RBL | CC 014/2013 | 2/19/2018 | 10/9/2043 | R$ 1,106,341.89 | 6/1/2025 | Ativa | T2014-015-A | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| VSB | BRASILIA LESTE | IB 138 kV MG 500 kV BRASILIA LESTE MG1 DF IB1 | DIT | 014/2013 | IPCA | RPEC | CC 014/2013 | 2/19/2018 | 10/9/2043 | R$230,295.48 | 6/1/2025 | Ativa | T2014-015-A | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| VSB | BRASILIA LESTE | EL 500 kV BRASILIA LESTE LT 500 kV BRASILIA LESTE /LUZIANIA C-2 DF/GO | RB | FT LT 500 kV BRASILIA LESTE /LUZIANIA C-2 DF/GO | 014/2013 | IPCA | RBL | CC 014/2013 | 2/19/2018 | 10/9/2043 | R$ 1,137,114.09 | 6/1/2025 | Ativa | T2014-015-B | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| VSB | BRASILIA LESTE | EL 500 kV BRASILIA LESTE LT 500 kV BRASILIA LESTE /LUZIANIA C-1 DF/GO | RB | FT LT 500 kV BRASILIA LESTE /LUZIANIA C-1 DF/GO | 014/2013 | IPCA | RBL | CC 014/2013 | 2/19/2018 | 10/9/2043 | R$ 1,180,112.60 | 6/1/2025 | Ativa | T2014-015-A | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| VSB | BRASILIA LESTE | EL 138 kV BRASILIA LESTE EL6 | DIT | 014/2013 | IPCA | RPEC | CC 014/2013 | 2/19/2018 | 10/9/2043 | R$407,804.48 | 6/1/2025 | Ativa | T2014-015-A | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| VSB | BRASILIA LESTE | EL 138 kV BRASILIA LESTE EL5 | DIT | 014/2013 | IPCA | RPEC | CC 014/2013 | 2/19/2018 | 10/9/2043 | R$407,804.48 | 6/1/2025 | Ativa | T2014-015-A | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| VSB | BRASILIA LESTE | EL 138 kV BRASILIA LESTE EL4 | DIT | 014/2013 | IPCA | RPEC | CC 014/2013 | 2/19/2018 | 10/9/2043 | R$407,804.48 | 6/1/2025 | Ativa | T2014-015-A | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| VSB | BRASILIA LESTE | EL 138 kV BRASILIA LESTE EL3 | DIT | 014/2013 | IPCA | RPEC | CC 014/2013 | 2/19/2018 | 10/9/2043 | R$407,804.48 | 6/1/2025 | Ativa | T2014-015-A | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| VSB | BRASILIA LESTE | EL 138 kV BRASILIA LESTE EL2 | DIT | 014/2013 | IPCA | RPEC | CC 014/2013 | 2/19/2018 | 10/9/2043 | R$407,804.48 | 6/1/2025 | Ativa | T2014-015-A | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| VSB | BRASILIA LESTE | EL 138 kV BRASILIA LESTE EL1 | DIT | 014/2013 | IPCA | RPEC | CC 014/2013 | 2/19/2018 | 10/9/2043 | R$407,804.48 | 6/1/2025 | Ativa | T2014-015-A | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Nordeste | BROT.MACAUBAS | MG 230 kV BROT.MACAUBAS MG1 BA | RB | FT MG 230 kV BROT.MACAUBAS MG1 BA | 061/2001 | IPCA | RBNI | REA 4629/2014 | 9/27/2013 | 12/31/2042 | R$195,888.67 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção, na SE Brotas de Macaúbas, de módulo geral, em 230 kV, arranjo barra dupla a quatro chaves, e módulos de infraestrutura de manobra associados à duas entradas de linha 230 kV e uma interligação de barramentos. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BROT.MACAUBAS | MG 230 kV BROT.MACAUBAS MG1 BA | RB | FT MG 230 kV BROT.MACAUBAS MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/17/2021 | 11/6/2040 | R$200,552.89 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BROT.MACAUBAS | IB 230 kV MG 230 kV BROT.MACAUBAS MG1 BA IB1 | RB | FT MG 230 kV BROT.MACAUBAS MG1 BA | 061/2001 | IPCA | RBNI | REA 4629/2014 | 9/27/2013 | 12/31/2042 | R$68,232.71 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção da interligação de barramentos, em 230 kV, arranjo barra dupla a quatro chaves, da SE Brotas de Macaúbas. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BROT.MACAUBAS | EL 230 kV BROT.MACAUBAS LT 230 kV IRECE /BROT.MACAUBAS C-1 BA | RB | FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA | 061/2001 | IPCA | RBNI | REA 4629/2014 | 9/27/2013 | 12/31/2042 | R$111,365.89 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção da entrada de linha, em 230 kV, arranjo barra dupla a quatro chaves, da SE Brotas de Macaúbas, para o circuito 1 da linha de transmissão 230 kV Irecê / Brotas de Macaúbas. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BROT.MACAUBAS | EL 230 kV BROT.MACAUBAS LT 230 kV IRECE /BROT.MACAUBAS C-1 BA | RB | FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/2/2022 | 5/1/2037 | R$3,737.28 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BROT.MACAUBAS | EL 230 kV BROT.MACAUBAS LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA | RB | FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA | 061/2001 | IPCA | RBNI | REA 4629/2014 | 9/27/2013 | 12/31/2042 | R$111,365.89 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção da entrada de linha, em 230 kV, arranjo barra dupla a quatro chaves, da SE Brotas de Macaúbas, para o circuito 1 da linha de transmissão 230 kV Brotas de Macaúbas / Bom Jesus da Lapa. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | BROT.MACAUBAS | EL 230 kV BROT.MACAUBAS LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA | RB | FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/2/2022 | 5/1/2037 | R$7,474.56 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | BRUMADO II | EL 230 kV BRUMADO II LT 230 kV BRUMADO II /IBICOARA C-1 BA | RB | FT LT 230 kV BRUMADO II /IBICOARA C-1 BA | 010/2007 | IPCA | RBL | CC 010/2007 | 6/11/2007 | 6/11/2037 | R$539,647.45 | 6/1/2025 | Ativa | T2000-115 | Contrato de Concessão nº 010/2007 *(Considera adicional de RGR relativo à prorrogação do encargo. Receita revisada em 19/06/2012 no reajuste para o Ciclo 2012-2013. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | BRUMADO II | EL 230 kV BRUMADO II LT 230 kV BRUMADO II /IBICOARA C-1 BA | RB | FT LT 230 kV BRUMADO II /IBICOARA C-1 BA | 010/2007 | IPCA | RMEL | REN 443/2011 | 10/26/2016 | 10/25/2044 | R$3,652.51 | 6/1/2025 | Ativa | Revitalização Necessária: Implantação deSwitches Industriais * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 22/06/2022) | |||
| AXIA Energia | C. DOURADA | TR 230/138 kV C. DOURADA TRR2 GO | RBF | FT TR 230/138 kV C. DOURADA TRR2 GO | 062/2001 | IPCA | RMEL | REA 7846/2019 | 9/30/2022 | 9/29/2056 | R$ 1,251,515.94 | 6/1/2025 | Ativa | T2019-024 | Obra de Substituição Completa - Substituição da unidade reserva ATRR2 230/138 kV, 40 MVA, na SE Cachoeira Dourada. A atual receita vinculada à PRT 579/2012 deverá ser cancelada quando esse empreendimento entrar em operação comercial. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | C. DOURADA | TR 230/138 kV C. DOURADA TR2 GO | RBF | FT TR 230/138 kV C. DOURADA TR2 GO | 062/2001 | IPCA | RMEL | REA 7846/2019 | 10/10/2022 | 10/9/2056 | R$ 3,756,374.19 | 6/1/2025 | Ativa | T2019-024 | Obra de Substituição Completa - Substituição do banco de autotransformadores monofásicos AT2 230/138/13,8 kV – 40 MVA, na subestação Cachoeira Dourada, por esgotamento de vida útil. A atual receita vinculada à PRT 579/2012 deverá ser cancelada quando esse empreendimento entrar em operação comercial. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | C. DOURADA | TR 230/138 kV C. DOURADA TR2 GO | RBF | FT TR 230/138 kV C. DOURADA TR2 GO | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/27/2021 | 3/14/2047 | R$78,568.02 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | C. DOURADA | MG 230 kV C. DOURADA MG2 GO | RB | FT MG 230 kV C. DOURADA MG2 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$398,203.07 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. DOURADA | MG 230 kV C. DOURADA MG2 GO | RB | FT MG 230 kV C. DOURADA MG2 GO | 062/2001 | IPCA | RMEL | REN 905/2020 | 9/30/2022 | 10/2/2052 | R$9,841.28 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | C. DOURADA | MC 230 kV TR 230/138 kV C. DOURADA TR2 GO | RBF | FT TR 230/138 kV C. DOURADA TR2 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,686.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. DOURADA | MC 230 kV TR 230/138 kV C. DOURADA TR2 GO | RBF | FT TR 230/138 kV C. DOURADA TR2 GO | 062/2001 | IPCA | RMEL | REA 7846/2019 | 10/10/2022 | 6/30/2052 | R$568,929.10 | 6/1/2025 | Ativa | T2019-024 | Adequação na conexão de 230 kV devido a substituição do TR2 na SE Cachoeira Dourada *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | C. DOURADA | MC 230 kV TR 230/138 kV C. DOURADA TR2 GO | RBF | FT TR 230/138 kV C. DOURADA TR2 GO | 062/2001 | IPCA | RMEL | REN 905/2020 | 2/10/2021 | 2/9/2036 | R$80,682.68 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | C. DOURADA | MC 138 kV TR 230/138 kV C. DOURADA TR2 GO | RBF | FT TR 230/138 kV C. DOURADA TR2 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$107,257.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. DOURADA | MC 138 kV TR 230/138 kV C. DOURADA TR2 GO | RBF | FT TR 230/138 kV C. DOURADA TR2 GO | 062/2001 | IPCA | RMEL | REA 7846/2019 | 10/10/2022 | 6/7/2052 | R$363,091.89 | 6/1/2025 | Ativa | T2019-024 | Adequação na conexão de 138 kV devido a substituição do TR2 na SE Cachoeira Dourada *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | C. DOURADA | MC 138 kV TR 230/138 kV C. DOURADA TR2 GO | RBF | FT TR 230/138 kV C. DOURADA TR2 GO | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/2/2021 | 7/1/2041 | R$157,482.95 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | C. DOURADA | EL 230 kV C. DOURADA LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO | RB | FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$208,406.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. DOURADA | EL 230 kV C. DOURADA LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO | RB | FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO | 062/2001 | IPCA | RMEL | REN 643/2014 | 1/22/2016 | 4/14/2047 | R$133,842.01 | 6/1/2025 | Ativa | Substituição do disjuntor DJ7714 (LI Rio Verde-CDourada) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. DOURADA | EL 230 kV C. DOURADA LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO | RB | FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/23/2018 | 10/5/2042 | R$227,482.23 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | C. DOURADA | EL 230 kV C. DOURADA LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO | RB | FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$208,406.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. DOURADA | EL 230 kV C. DOURADA LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO | RB | FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO | 062/2001 | IPCA | RMEL | REN 643/2014 | 1/30/2016 | 4/22/2047 | R$133,935.13 | 6/1/2025 | Ativa | Substituição do disjuntor DJ7724 (LI Itumbiara-CDourada) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. DOURADA | EL 230 kV C. DOURADA LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO | RB | FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 1/30/2016 | 4/24/2038 | R$19,720.17 | 6/1/2025 | Ativa | Substituição de 3 para raios no vão da LT 230 kV Cachoeira Dourada - Itumbiara. - Nº Oper: PR772T - PMI (013913/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. DOURADA | EL 230 kV C. DOURADA LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO | RB | FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO | 062/2001 | IPCA | RMEL | REN 905/2020 | 8/6/2020 | 9/2/2039 | R$123,249.10 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | C. MAGALHAES | TR 138/13,8 kV C. MAGALHAES TR1 MT | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$85,615.33 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | C. MAGALHAES | TR 138/13,8 kV C. MAGALHAES TR1 MT | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$185,864.35 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | C. MAGALHAES | TR 138/13,8 kV C. MAGALHAES TR1 MT | DIT | 058/2001 | IPCA | RMELP | REA 14780/2023 | R$978,285.37 | 6/1/2025 | Prevista | T2023-074 | Obra de Substituição Completa - Substituição do transformador 138/13.8kV - 15MVA - NÚMERO 1 de Couto Magalhães - CMTF5-01. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 0001343/2022. | |||||
| AXIA Energia Norte | C. MAGALHAES | RTB 138 kV 5 Mvar C. MAGALHAES RT2 MT | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$149,437.11 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | C. MAGALHAES | RTB 138 kV 5 Mvar C. MAGALHAES RT2 MT | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$324,416.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | C. MAGALHAES | RTB 138 kV 5 Mvar C. MAGALHAES RT1 MT | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$149,437.11 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | C. MAGALHAES | RTB 138 kV 5 Mvar C. MAGALHAES RT1 MT | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$324,416.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | C. MAGALHAES | MG 138 kV C. MAGALHAES MG1 MT | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$369,510.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | C. MAGALHAES | MG 138 kV C. MAGALHAES MG1 MT | DIT | 058/2001 | IPCA | RCDMA | REA 10495/2021 | R$336,293.84 | 6/1/2025 | Prevista | T2021-072 | Adequações doSistema de Proteção, Controle e Supervisão-SPCS e telecomunicação, na SE Couto Magalhães, no Módulo Geral, em função do seccionamento da LT 138 kV Rondonopolis - Couto Magalhães na SE Petrovina. | |||||
| AXIA Energia Norte | C. MAGALHAES | MG 138 kV C. MAGALHAES MG1 MT | DIT | 058/2001 | IPCA | RMEL | REN 905/2020 | 12/27/2012 | 12/26/2029 | R$9,132.09 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | C. MAGALHAES | MG 138 kV C. MAGALHAES MG1 MT | DIT | 058/2001 | IPCA | RCDM | DSP 1107/2021 | 8/1/2014 | 7/31/2039 | R$19,450.24 | 6/1/2025 | Ativa | IMPLANTACAO DE SISTEMA DE DETECCAO E ALARME CONTRA INCENDIO Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | C. MAGALHAES | MC 138 kV TR 138/13,8 kV C. MAGALHAES TR1 MT | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$122,666.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | C. MAGALHAES | MC 138 kV RTB 138 kV 5 Mvar C. MAGALHAES RT2 MT | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$121,870.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | C. MAGALHAES | MC 138 kV RTB 138 kV 5 Mvar C. MAGALHAES RT1 MT | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$121,870.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | C. MAGALHAES | MC 13,8 kV TR 138/13,8 kV C. MAGALHAES TR1 MT | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$53,235.92 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | C. MAGALHAES | EL 138 kV C. MAGALHAES LT 138 kV PARQUE EMAS /C. MAGALHAES C-1 GO/MT | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$138,837.55 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | C. MAGALHAES | EL 138 kV C. MAGALHAES LT 138 kV C. MAGALHAES /RONDONOPOLIS C-1 MT | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$138,837.55 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | C. MAGALHAES | EL 138 kV C. MAGALHAES LT 138 kV C. MAGALHAES /RONDONOPOLIS C-1 MT | DIT | 058/2001 | IPCA | RCDMA | REA 10495/2021 | R$244,982.23 | 6/1/2025 | Prevista | T2021-072 | Adequações doSistema de Proteção, Controle e Supervisão-SPCS, na SE Couto Magalhães, na EL para Rondonópolis, em função do seccionamento da LT 138 kV Rondonopolis - Couto Magalhães na SE Petrovina. | |||||
| AXIA Energia Norte | C. MAGALHAES | EL 13,8 kV C. MAGALHAES DIST2 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,540.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | C. MAGALHAES | EL 13,8 kV C. MAGALHAES DIST1 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,540.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | C. PAULISTA | TT 13,8/0,12 kV C. PAULISTA TR59 SP | RBF | FT TR 500/138 kV C. PAULISTA TR59 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | TT 13,8/0,12 kV C. PAULISTA TR57 SP | RBF | FT TR 500/138 kV C. PAULISTA TR57 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | TR 500/138 kV C. PAULISTA TRR1 SP | RBF | FT TR 500/138 kV C. PAULISTA TRR1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$407,272.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | TR 500/138 kV C. PAULISTA TRR1 SP | RBF | FT TR 500/138 kV C. PAULISTA TRR1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,562,859.96 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | TR 500/138 kV C. PAULISTA TRR1 SP | RBF | FT TR 500/138 kV C. PAULISTA TRR1 SP | 062/2001 | IPCA | RMELP | REA 11449/2022 | R$ 2,139,017.16 | 6/1/2025 | Prevista | T2022-012 | Obra de Substituição Completa - Substituir na SE C. Paulista o transformador monofásico reserva - TRR1 - 500/138 kV - 1x83,33 MVA por outro de 1x83,33 MVA. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia | C. PAULISTA | TR 500/138 kV C. PAULISTA TR59 SP | RBF | FT TR 500/138 kV C. PAULISTA TR59 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,223,974.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | TR 500/138 kV C. PAULISTA TR59 SP | RBF | FT TR 500/138 kV C. PAULISTA TR59 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,696,852.16 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | TR 500/138 kV C. PAULISTA TR59 SP | RBF | FT TR 500/138 kV C. PAULISTA TR59 SP | 062/2001 | IPCA | RMELP | REA 11449/2022 | R$ 6,417,051.52 | 6/1/2025 | Prevista | T2022-011 | Obra de Substituição Completa - Substituir na SE C. Paulista o transformador monofásico - TR59 - 500/138 kV - 3x83,33 MVA por outro de 3x83,33 MVA. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia | C. PAULISTA | TR 500/138 kV C. PAULISTA TR59 SP | RBF | FT TR 500/138 kV C. PAULISTA TR59 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/27/2022 | 12/29/2044 | R$426,938.22 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | C. PAULISTA | TR 500/138 kV C. PAULISTA TR57 SP | RBF | FT TR 500/138 kV C. PAULISTA TR57 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,223,974.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | TR 500/138 kV C. PAULISTA TR57 SP | RBF | FT TR 500/138 kV C. PAULISTA TR57 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,696,852.16 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | TR 500/138 kV C. PAULISTA TR57 SP | RBF | FT TR 500/138 kV C. PAULISTA TR57 SP | 062/2001 | IPCA | RMELP | REA 11449/2022 | R$ 6,417,051.52 | 6/1/2025 | Prevista | T2022-010 | Obra de Substituição Completa - Substituir na SE C. Paulista o transformador monofásico - TR57 - 500/138 kV - 3x83,33 MVA por outro de 3x83,33 MVA. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia | C. PAULISTA | TR 500/138 kV C. PAULISTA TR57 SP | RBF | FT TR 500/138 kV C. PAULISTA TR57 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/2/2022 | 1/8/2038 | R$469,651.15 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | C. PAULISTA | RTL 500 kV 50 Mvar C. PAULISTA RTR2 SP | RB | FT RTL 500 kV 50 Mvar C. PAULISTA RTR2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$238,558.11 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | RTL 500 kV 50 Mvar C. PAULISTA RTR2 SP | RB | FT RTL 500 kV 50 Mvar C. PAULISTA RTR2 SP | 062/2001 | IPCA | RMELP | REA 12637/2022 | R$936,069.47 | 6/1/2025 | Prevista | T2022-103 | Obra de Substituição Completa - Substituição, na SE C. PAULISTA, de um Banco de Reatores de Linha Monofásicos RTR2 500 kV - 50 Mvar por outro de mesma potência. | ||||
| AXIA Energia | C. PAULISTA | RTL 500 kV 136 Mvar C. PAULISTA RT2 SP | RB | FT RTL 500 kV 136 MVAr C. PAULISTA RT2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$715,674.32 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | RTB 500 kV 45,33 Mvar C. PAULISTA RTR1 SP | RB | FT RTB 500 kV 45,33 Mvar C. PAULISTA RTR1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$238,500.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | RTB 500 kV 136 Mvar C. PAULISTA RT1 SP | RB | FT RTB 500 kV 136 Mvar C. PAULISTA RT1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$715,674.32 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | MG 500 kV C. PAULISTA MG1 SP | RB | FT MG 500 kV C. PAULISTA MG1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,791,372.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | MG 500 kV C. PAULISTA MG1 SP | RB | FT MG 500 kV C. PAULISTA MG1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/31/2017 | 3/27/2033 | R$ 647.02 | 6/1/2025 | Ativa | Substituição de IHMs do Sistema de Supervisão e Controle Local (SAGE) por obsolescência ou por atualização tecnológica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | MG 500 kV C. PAULISTA MG1 SP | RB | FT MG 500 kV C. PAULISTA MG1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/21/2016 | 8/16/2029 | R$24,313.81 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (004258/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | MG 500 kV C. PAULISTA MG1 SP | RB | FT MG 500 kV C. PAULISTA MG1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/21/2016 | 8/16/2029 | R$7,408.66 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (004275/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | MG 500 kV C. PAULISTA MG1 SP | RB | FT MG 500 kV C. PAULISTA MG1 SP | 062/2001 | IPCA | RBNI | REA 4347/2013 | 11/24/2017 | 11/23/2045 | R$67,440.93 | 6/1/2025 | Ativa | Substituição de RDP * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 – 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | MG 500 kV C. PAULISTA MG1 SP | RB | FT MG 500 kV C. PAULISTA MG1 SP | 062/2001 | IPCA | RBNI | REA 8314/2019 | 2/11/2021 | 2/10/2049 | R$7,093.58 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000427/2014 (FT: LT 500 kV ANGRA FUR / C. PAULISTA C 1 RJ/SP) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | MG 500 kV C. PAULISTA MG1 SP | RB | FT MG 500 kV C. PAULISTA MG1 SP | 062/2001 | IPCA | RBNI | REA 8314/2019 | 2/11/2021 | 2/10/2049 | R$7,093.58 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000423/2014. (FT: LT 500 kV C. PAULISTA / CAMPINAS C 1 SP) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | MG 500 kV C. PAULISTA MG1 SP | RB | FT MG 500 kV C. PAULISTA MG1 SP | 062/2001 | IPCA | RBNI | REA 8314/2019 | 2/11/2021 | 2/10/2049 | R$7,093.58 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000382/2014. (FT: LT 500 kV C. PAULISTA / ITAJUBA 3 C 1 SP/MG) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | MG 500 kV C. PAULISTA MG1 SP | RB | FT MG 500 kV C. PAULISTA MG1 SP | 062/2001 | IPCA | RBNI | REA 8314/2019 | 2/11/2021 | 2/10/2049 | R$7,093.58 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000358/2014. (FT: LT 500 kV ADRIANOPOLIS / C. PAULISTA C 1 RJ/SP) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | MG 500 kV C. PAULISTA MG1 SP | RB | FT MG 500 kV C. PAULISTA MG1 SP | 062/2001 | IPCA | RBNI | REA 8314/2019 | 2/11/2021 | 2/10/2049 | R$7,093.58 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000368/2014. (FT: LT 500 kV B. FLUMINENSE / C. PAULISTA C 1 RJ/SP) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | MG 500 kV C. PAULISTA MG1 SP | RB | FT MG 500 kV C. PAULISTA MG1 SP | 062/2001 | IPCA | RBNI | REA 8314/2019 | 2/11/2021 | 2/10/2049 | R$7,093.58 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000370/2014. (FT: LT 500 kV C. PAULISTA / RESENDE C 1 SP/RJ) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | MG 500 kV C. PAULISTA MG1 SP | RB | FT MG 500 kV C. PAULISTA MG1 SP | 062/2001 | IPCA | RBNI | REA 8314/2019 | 2/11/2021 | 2/10/2049 | R$7,093.58 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000359/2014. (FT: LT 500 kV C. PAULISTA / TAUBATE C 1 SP) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | MG 500 kV C. PAULISTA MG1 SP | RB | FT MG 500 kV C. PAULISTA MG1 SP | 062/2001 | IPCA | RBNI | REA 8314/2019 | 2/11/2021 | 2/10/2049 | R$7,093.58 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000363/2014. (FT: LT 500 kV C. PAULISTA / TIJUCO PRETO C 1 SP) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | MG 500 kV C. PAULISTA MG1 SP | RB | FT MG 500 kV C. PAULISTA MG1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/1/2016 | 3/6/2040 | R$528,549.02 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | C. PAULISTA | MC 500 kV TR 500/138 kV C. PAULISTA TR59 SP | RBF | FT TR 500/138 kV C. PAULISTA TR59 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | MC 500 kV TR 500/138 kV C. PAULISTA TR59 SP | RBF | FT TR 500/138 kV C. PAULISTA TR59 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,518,075.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | MC 500 kV TR 500/138 kV C. PAULISTA TR59 SP | RBF | FT TR 500/138 kV C. PAULISTA TR59 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2018 | 12/31/2041 | R$64,205.71 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | C. PAULISTA | MC 500 kV TR 500/138 kV C. PAULISTA TR57 SP | RBF | FT TR 500/138 kV C. PAULISTA TR57 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | MC 500 kV TR 500/138 kV C. PAULISTA TR57 SP | RBF | FT TR 500/138 kV C. PAULISTA TR57 SP | 062/2001 | IPCA | RMEL | REN 643/2014 | 5/9/2015 | 12/1/2036 | R$38,807.97 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 3 para-raios PMI 2015-2018 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | MC 500 kV RTL 500 kV 136 Mvar C. PAULISTA RT2 SP | RB | FT RTL 500 kV 136 MVAr C. PAULISTA RT2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,673.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | MC 500 kV RTB 500 kV 136 Mvar C. PAULISTA RT1 SP | RB | FT RTB 500 kV 136 Mvar C. PAULISTA RT1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$338,868.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | MC 138 kV TR 500/138 kV C. PAULISTA TR59 SP | RBF | FT TR 500/138 kV C. PAULISTA TR59 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,609.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | MC 138 kV TR 500/138 kV C. PAULISTA TR57 SP | RBF | FT TR 500/138 kV C. PAULISTA TR57 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,609.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | MC 13,8 kV TT 13,8/0,12 kV C. PAULISTA TR59 SP | RBF | FT TR 500/138 kV C. PAULISTA TR59 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | MC 13,8 kV TT 13,8/0,12 kV C. PAULISTA TR57 SP | RBF | FT TR 500/138 kV C. PAULISTA TR57 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | IB 500 kV MG 500 kV C. PAULISTA MG1 SP IB3 | RB | FT MG 500 kV C. PAULISTA MG1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | IB 500 kV MG 500 kV C. PAULISTA MG1 SP IB2 | RB | FT MG 500 kV C. PAULISTA MG1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | IB 500 kV MG 500 kV C. PAULISTA MG1 SP IB1 | RB | FT MG 500 kV C. PAULISTA MG1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | IB 138 kV MG 500 kV C. PAULISTA MG1 SP IB1 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$92,690.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | C. PAULISTA | IB 138 kV MG 500 kV C. PAULISTA MG1 SP IB1 | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/22/2015 | 11/24/2045 | R$26,158.39 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição da SC603 (Amarre) *Receita incluída no recurso contra a REH 2.407/2018 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP | RB | FT LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP | RB | FT LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/15/2016 | 2/8/2040 | R$41,679.81 | 6/1/2025 | Ativa | Substituição de 3 para-raios no vão da LT Adrianópolis - C.Paulista circ 1 - Nº Oper: PR 9427 - PMI (006220/2015) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP | RB | FT LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP | 062/2001 | IPCA | RBNI | REA 5861/2016 | 2/10/2021 | 2/9/2036 | R$7,548.70 | 6/1/2025 | Ativa | LT 500kV Adrianópolis - Cachoeira Paulista C1 - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP | RB | FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP | RB | FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP | 062/2001 | IPCA | RBNI | REA 2040/2009 | 9/30/2012 | 8/27/2027 | R$13,294.81 | 6/1/2025 | Ativa | Substituição de 02 Bobinas de Bloqueio *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP | RB | FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP | 062/2001 | IPCA | RMEL | REN 643/2014 | 11/6/2015 | 11/29/2037 | R$39,739.02 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 3 para-raios PMI 2015-2018 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP | RB | FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,720,019.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP | RB | FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP | 062/2001 | IPCA | RBNI | REA 5861/2016 | 2/10/2021 | 2/9/2036 | R$7,548.70 | 6/1/2025 | Ativa | LT 500kV Cachoeira Paulista - Tijuco Preto 1 - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP | RB | FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 4/26/2019 | 12/27/2041 | R$252,414.40 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TAUBATE C-1 SP | RB | FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TAUBATE C-1 SP | RB | FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/28/2017 | 8/19/2046 | R$60,675.93 | 6/1/2025 | Ativa | Substituição da SC9337/9330T (LT C.Paulista - Taubaté) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TAUBATE C-1 SP | RB | FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/28/2017 | 8/20/2040 | R$42,143.33 | 6/1/2025 | Ativa | Substituição de 3 para-raios no vão da LT C.Paulista - Taubaté * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TAUBATE C-1 SP | RB | FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP | 062/2001 | IPCA | RBNI | REA 4347/2013 | 4/25/2017 | 4/24/2045 | R$7,507.11 | 6/1/2025 | Ativa | Substituição de RDP * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TAUBATE C-1 SP | RB | FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP | 062/2001 | IPCA | RBNI | REA 5861/2016 | 2/10/2021 | 2/9/2036 | R$7,548.70 | 6/1/2025 | Ativa | LT 500kV Cachoeira Paulista - Taubaté - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TAUBATE C-1 SP | RB | FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/19/2017 | 3/11/2045 | R$327,525.34 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ | RB | FT LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ | RB | FT LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ | 062/2001 | IPCA | RBNI | REA 5861/2016 | 2/10/2021 | 2/9/2036 | R$7,548.70 | 6/1/2025 | Ativa | LT 500kV Cachoeira Paulista - Resende - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ | RB | FT LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/20/2018 | 5/22/2048 | R$76,649.87 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG | RB | FT LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG | RB | FT LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG | 062/2001 | IPCA | RMEL | REN 643/2014 | 11/1/2015 | 10/31/2037 | R$39,711.79 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 3 para-raios PMI 2015-2018 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG | RB | FT LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG | 062/2001 | IPCA | RBNI | REA 5861/2016 | 2/10/2021 | 2/9/2036 | R$7,548.70 | 6/1/2025 | Ativa | LT 500kV Cachoeira Paulista - Itajubá - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP | RB | FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP | RB | FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP | 062/2001 | IPCA | RMEL | REN 643/2014 | 11/17/2015 | 12/10/2037 | R$39,793.45 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 3 para-raios. Melhoria incluída no reajuste do ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP | RB | FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,720,019.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP | RB | FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP | 062/2001 | IPCA | RBNI | REA 5861/2016 | 2/10/2021 | 2/9/2036 | R$7,548.70 | 6/1/2025 | Ativa | LT 500kV Cachoeira Paulista - Campinas - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP | RB | FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 2/27/2017 | 5/4/2045 | R$279,502.76 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV B. FLUMINENSE /C. PAULISTA C-1 RJ/SP | RB | FT LT 500 kV B. FLUMINENSE /C. PAULISTA C-1 RJ/SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV B. FLUMINENSE /C. PAULISTA C-1 RJ/SP | RB | FT LT 500 kV B. FLUMINENSE /C. PAULISTA C-1 RJ/SP | 062/2001 | IPCA | RBNI | REA 5861/2016 | 2/10/2021 | 2/9/2036 | R$7,548.70 | 6/1/2025 | Ativa | LT 500kV Baixada Fluminense - Cachoeira Paulista - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV B. FLUMINENSE /C. PAULISTA C-1 RJ/SP | RB | FT LT 500 kV B. FLUMINENSE /C. PAULISTA C-1 RJ/SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/1/2014 | 11/3/2044 | R$29,709.23 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV B. FLUMINENSE /C. PAULISTA C-1 RJ/SP | RB | FT LT 500 kV B. FLUMINENSE /C. PAULISTA C-1 RJ/SP | 062/2001 | IPCA | RBNI | DSP 1107/2021 | 2/28/2016 | 3/2/2046 | R$29,748.23 | 6/1/2025 | Ativa | SE da UHE Marimbondo - vão da UG03 e UG02. Regularização de extrapatrimonial nos termos do Despacho nº 1.107/2021 Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP | RB | FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP | RB | FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP | 062/2001 | IPCA | RMEL | REN 643/2014 | 1/15/2016 | 4/9/2038 | R$40,088.56 | 6/1/2025 | Ativa | Substituição de 3 para-raios no vão da LT Angra - C.Paulista * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP | RB | FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP | 062/2001 | IPCA | RBNI | REA 5861/2016 | 2/10/2021 | 2/9/2036 | R$7,548.70 | 6/1/2025 | Ativa | LT 500kV Angra - Cachoeira Paulista - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | C. PAULISTA | EL 500 kV C. PAULISTA LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP | RB | FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 9/28/2015 | 4/29/2043 | R$146,165.69 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | C. PAULISTA | EL 138 kV C. PAULISTA LT 138 kV C. PAULISTA /VOLTA REDONDA C-2 SP/RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | C. PAULISTA | EL 138 kV C. PAULISTA LT 138 kV C. PAULISTA /VOLTA REDONDA C-2 SP/RJ | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 11/29/2015 | 12/21/2043 | R$19,391.27 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição da SC6251 PMI 2015-2018 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | C. PAULISTA | EL 138 kV C. PAULISTA LT 138 kV C. PAULISTA /VOLTA REDONDA C-2 SP/RJ | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 12/5/2015 | 1/27/2044 | R$19,403.16 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição da SC6253 (LI C.Paulista - Volta Redonda circ 2) PMI 2015-2018 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | C. PAULISTA | EL 138 kV C. PAULISTA LT 138 kV C. PAULISTA /VOLTA REDONDA C-1 SP/RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | TT 69/13,8 kV C.GRANDE II TA2 PB | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | TT 69/13,8 kV C.GRANDE II TA1 PB | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | TT 69/13,8 kV C.GRANDE II TA1 PB | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$248,222.69 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | TT 69/13,8 kV C.GRANDE II TA1 PB | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$228,831.00 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | TR 230/69 kV C.GRANDE II TR6 PB | RBF | FT TR 230/69 kV C.GRANDE II TR6 PB | 061/2001 | IPCA | RBNI | REA 8328/2019 | 12/12/2022 | 4/1/2057 | R$ 2,250,172.19 | 6/1/2025 | Ativa | T2019-070 | Instalação do quarto transformador trifásico 230/69 kV - 100 MVA na SE Campina Grande II, TR6. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | C.GRANDE II | TR 230/69 kV C.GRANDE II TR5 PB | RBF | FT TR 230/69 kV C.GRANDE II TR5 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | TR 230/69 kV C.GRANDE II TR5 PB | RBF | FT TR 230/69 kV C.GRANDE II TR5 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | TR 230/69 kV C.GRANDE II TR5 PB | RBF | FT TR 230/69 kV C.GRANDE II TR5 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$913,997.96 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | TR 230/69 kV C.GRANDE II TR4 PB | RBF | FT TR 230/69 kV C.GRANDE II TR4 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | TR 230/69 kV C.GRANDE II TR4 PB | RBF | FT TR 230/69 kV C.GRANDE II TR4 PB | 061/2001 | IPCA | RMELP | DSP 852/2024 | R$ 2,183,835.24 | 6/1/2025 | Prevista | T2024-032 | Obra de Substituição Completa: Substituição de 1 (um) Transformador de Potência trifásico, potência 100 MVA, posição operacional 04T4, da Subestação C. GRANDE II. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia Nordeste | C.GRANDE II | TR 230/69 kV C.GRANDE II TR3 PB | RBF | FT TR 230/69 kV C.GRANDE II TR3 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | TR 230/69 kV C.GRANDE II TR3 PB | RBF | FT TR 230/69 kV C.GRANDE II TR3 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | TR 230/69 kV C.GRANDE II TR3 PB | RBF | FT TR 230/69 kV C.GRANDE II TR3 PB | 061/2001 | IPCA | RMELP | DSP 852/2024 | R$ 2,183,835.24 | 6/1/2025 | Prevista | T2024-031 | Obra de Substituição Completa: Substituição de 1 (um) Transformador de Potência trifásico, potência 100 MVA, posição operacional 04T3, da Subestação C. GRANDE II. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia Nordeste | C.GRANDE II | TR 230/26 kV C.GRANDE II TR1 PB | RB | FT CE 100/-0 Mvar C.GRANDE II CE1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$633,438.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | TR 230/138 kV C.GRANDE II TR2 PB | RBF | FT TR 230/138 kV C.GRANDE II TR2 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$274,486.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | TR 230/138 kV C.GRANDE II TR2 PB | RBF | FT TR 230/138 kV C.GRANDE II TR2 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/6/2021 | 12/15/2055 | R$59,313.36 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | TR 230/138 kV C.GRANDE II TR1 PB | RBF | FT TR 230/138 kV C.GRANDE II TR1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$274,486.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | TR 230/138 kV C.GRANDE II TR1 PB | RBF | FT TR 230/138 kV C.GRANDE II TR1 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/18/2021 | 10/26/2056 | R$158,280.65 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | RTS 13,8 kV 5 Mvar C.GRANDE II RT2 PB | RBF | FT TR 230/138 kV C.GRANDE II TR2 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | RTS 13,8 kV 5 Mvar C.GRANDE II RT2 PB | RBF | FT TR 230/138 kV C.GRANDE II TR2 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$351,841.75 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | RTS 13,8 kV 5 Mvar C.GRANDE II RT1 PB | RBF | FT TR 230/138 kV C.GRANDE II TR1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | RTS 13,8 kV 5 Mvar C.GRANDE II RT1 PB | RBF | FT TR 230/138 kV C.GRANDE II TR1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$351,841.75 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | RTS 13,8 kV 5 Mvar C.GRANDE II RT1 PB | RBF | FT TR 230/138 kV C.GRANDE II TR1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$324,355.11 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | RTB 230 kV 30 Mvar C.GRANDE II RT2 PB | RB | FT RTB 230 kV 30 MVAr C.GRANDE II RT2 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$230,612.27 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | RTB 230 kV 10 Mvar C.GRANDE II RT1 PB | RB | FT RTB 230 kV 10 Mvar C.GRANDE II RT1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$192,025.69 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | RTB 230 kV 10 Mvar C.GRANDE II RT1 PB | RB | FT RTB 230 kV 10 Mvar C.GRANDE II RT1 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/23/2018 | 2/2/2054 | R$3,068.23 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | RTB 13,8 kV 5 Mvar C.GRANDE II RT2 PB | RBF | FT RTB 13,8 kV 5 MVAr C.GRANDE II RT2 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | RTB 13,8 kV 5 Mvar C.GRANDE II RT1 PB | RBF | FT RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MG 230 kV C.GRANDE II MG1 PB | RB | FT MG 230 kV C.GRANDE II MG1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$950,492.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MG 230 kV C.GRANDE II MG1 PB | RB | FT MG 230 kV C.GRANDE II MG1 PB | 061/2001 | IPCA | RMEL | REN 643/2014 | 8/16/2013 | 8/15/2030 | R$2,169.29 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCOS DE BATERIAS -48Vcc. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MG 230 kV C.GRANDE II MG1 PB | RB | FT MG 230 kV C.GRANDE II MG1 PB | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/26/2015 | 12/25/2032 | R$17,550.21 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição das Bateriais Saturnia 60PZS400 125Vcc, Posições 800A3 e 800A4 .Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MG 230 kV C.GRANDE II MG1 PB | RB | FT MG 230 kV C.GRANDE II MG1 PB | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/27/2015 | 12/26/2030 | R$62,462.54 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SWITCH.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MG 230 kV C.GRANDE II MG1 PB | RB | FT MG 230 kV C.GRANDE II MG1 PB | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/21/2014 | 11/16/2045 | R$27,183.61 | 6/1/2025 | Ativa | Revitalização Necessária: SUBSTITUIÇÃO DOS TP 82BP-2 FASES (A,B e C). Incluído no recurso em face da REH 2.098/2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MG 230 kV C.GRANDE II MG1 PB | RB | FT MG 230 kV C.GRANDE II MG1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,667,241.19 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MG 230 kV C.GRANDE II MG1 PB | RB | FT MG 230 kV C.GRANDE II MG1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,458,870.49 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MG 230 kV C.GRANDE II MG1 PB | RB | FT MG 230 kV C.GRANDE II MG1 PB | 061/2001 | IPCA | RMEL | REN 443/2011 | 9/23/2016 | 9/22/2033 | R$7,637.70 | 6/1/2025 | Ativa | Implantação de Banco de Baterias * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MG 230 kV C.GRANDE II MG1 PB | RB | FT MG 230 kV C.GRANDE II MG1 PB | 061/2001 | IPCA | RMEL | REN 443/2011 | 2/1/2016 | 1/31/2033 | R$12,142.19 | 6/1/2025 | Ativa | Substituição do Grupo Gerador Emergência * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MG 230 kV C.GRANDE II MG1 PB | RB | FT MG 230 kV C.GRANDE II MG1 PB | 061/2001 | IPCA | RBNI | REA 8328/2019 | 12/12/2022 | 11/4/2051 | R$230,416.90 | 6/1/2025 | Ativa | T2019-070 | Módulo de infraestrutura de manobra em 230 kV, associado ao TR6. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | C.GRANDE II | MG 230 kV C.GRANDE II MG1 PB | RB | FT MG 230 kV C.GRANDE II MG1 PB | 061/2001 | IPCA | RBNI | REA 8328/2019 | 12/12/2022 | 12/28/2050 | R$66,622.91 | 6/1/2025 | Ativa | T2019-070 | Módulo de infraestrutura de manobra em 69 kV, associado ao TR6. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | C.GRANDE II | MG 230 kV C.GRANDE II MG1 PB | RB | FT MG 230 kV C.GRANDE II MG1 PB | 061/2001 | IPCA | RBNI | REA 7761/2019 | 7/28/2020 | 6/25/2036 | R$37,723.68 | 6/1/2025 | Ativa | Implantação de Sistema para acesso remoto a dispositivos de Proteção, Controle e Automação. Sistema composto de Painel com PCs Industriais (Concentrador e Firewall), Receptor GPS, Switch Gerenciável. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MG 230 kV C.GRANDE II MG1 PB | RB | FT MG 230 kV C.GRANDE II MG1 PB | 061/2001 | IPCA | RBNI | REN 905/2020 | 12/11/2014 | 12/27/2042 | R$55,666.85 | 6/1/2025 | Ativa | MIM ASSOCIADO: Instalar um módulo de entrada de linha 69kV, na SE C.GRANDE II, arranjo barra principal e transferência, destino Aeroclube C-1 - 02J2 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MG 230 kV C.GRANDE II MG1 PB | RB | FT MG 230 kV C.GRANDE II MG1 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/24/2017 | 4/1/2033 | R$738,083.60 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 69 kV TT 69/13,8 kV C.GRANDE II TA1 PB TA1/TA2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | MC 69 kV TT 69/13,8 kV C.GRANDE II TA1 PB TA1/TA2 | DIT | 061/2001 | IPCA | RCDM | REA 7761/2019 | 7/28/2020 | 7/27/2048 | R$ 371.41 | 6/1/2025 | Ativa | Implantação de Sistema para acesso remoto a dispositivos de Proteção, Controle e Automação. Sistema composto de Painel com PCs Industriais (Concentrador e Firewall), Receptor GPS, Switch Gerenciável etc. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | C.GRANDE II | MC 69 kV TR 69/13,8 kV C.GRANDE II TR7A PB TR7B/TR7C | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$56,157.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | MC 69 kV TR 69/13,8 kV C.GRANDE II TR7A PB TR7B/TR7C | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/8/2015 | 10/7/2030 | R$ 327.06 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32T7-6.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020). Instalação transferida para a distribuidora. *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | C.GRANDE II | MC 69 kV TR 69/13,8 kV C.GRANDE II TR7A PB TR7B/TR7C | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/9/2015 | 10/8/2030 | R$ 327.12 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32T7-5.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020). Instalação transferida para a distribuidora. *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | C.GRANDE II | MC 69 kV TR 69/13,8 kV C.GRANDE II TR7A PB TR7B/TR7C | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/26/2018 | 8/28/2048 | R$31,013.10 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | C.GRANDE II | MC 69 kV TR 230/69 kV C.GRANDE II TR6 PB | RBF | FT TR 230/69 kV C.GRANDE II TR6 PB | 061/2001 | IPCA | RBNI | REA 8328/2019 | 12/12/2022 | 1/17/2054 | R$586,053.32 | 6/1/2025 | Ativa | T2019-070 | Instalação, na SE C.GRANDE II, de um módulo de conexão, em 69 kV, para o autotransformador TR 230/69 kV C.GRANDE II TR6 PB *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | C.GRANDE II | MC 69 kV TR 230/69 kV C.GRANDE II TR5 PB | RBF | FT TR 230/69 kV C.GRANDE II TR5 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 69 kV TR 230/69 kV C.GRANDE II TR4 PB | RBF | FT TR 230/69 kV C.GRANDE II TR4 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 69 kV TR 230/69 kV C.GRANDE II TR4 PB | RBF | FT TR 230/69 kV C.GRANDE II TR4 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/22/2018 | 4/24/2048 | R$30,687.15 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 69 kV TR 230/69 kV C.GRANDE II TR3 PB | RBF | FT TR 230/69 kV C.GRANDE II TR3 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 69 kV BC 69 kV 21,2 Mvar C.GRANDE II BC2 PB | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | MC 69 kV BC 69 kV 21,2 Mvar C.GRANDE II BC2 PB | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | MC 69 kV BC 69 kV 21,2 Mvar C.GRANDE II BC2 PB | DIT | 061/2001 | IPCA | RCDM | REA 7761/2019 | 7/28/2020 | 7/27/2048 | R$ 371.41 | 6/1/2025 | Ativa | Implantação de Sistema para acesso remoto a dispositivos de Proteção, Controle e Automação. Sistema composto de Painel com PCs Industriais (Concentrador e Firewall), Receptor GPS, Switch Gerenciável etc. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | C.GRANDE II | MC 69 kV BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | MC 69 kV BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | MC 69 kV BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/9/2013 | 6/2/2046 | R$57,466.39 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | C.GRANDE II | MC 26 kV TR 230/26 kV C.GRANDE II TR1 PB CE2 | RB | FT CE 100/-0 Mvar C.GRANDE II CE1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 26 kV TR 230/26 kV C.GRANDE II TR1 PB CE1 | RB | FT CE 100/-0 Mvar C.GRANDE II CE1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV TR 230/69 kV C.GRANDE II TR6 PB | RBF | FT TR 230/69 kV C.GRANDE II TR6 PB | 061/2001 | IPCA | RBNI | REA 8328/2019 | 12/12/2022 | 12/13/2053 | R$ 1,556,754.91 | 6/1/2025 | Ativa | T2019-070 | Instalação, na SE C.GRANDE II, de um módulo de conexão, em 230 kV, para o autotransformador TR 230/69 kV C.GRANDE II TR6 PB *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV TR 230/69 kV C.GRANDE II TR5 PB | RBF | FT TR 230/69 kV C.GRANDE II TR5 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV TR 230/69 kV C.GRANDE II TR4 PB | RBF | FT TR 230/69 kV C.GRANDE II TR4 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV TR 230/69 kV C.GRANDE II TR4 PB | RBF | FT TR 230/69 kV C.GRANDE II TR4 PB | 061/2001 | IPCA | RMEL | REN 443/2011 | 8/13/2017 | 8/29/2050 | R$108,070.76 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE DISJUNTOR, POSIÇÃO 14T4 DA SE C.GRANDE II * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV TR 230/69 kV C.GRANDE II TR4 PB | RBF | FT TR 230/69 kV C.GRANDE II TR4 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/16/2021 | 7/4/2044 | R$26,199.60 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV TR 230/69 kV C.GRANDE II TR3 PB | RBF | FT TR 230/69 kV C.GRANDE II TR3 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV TR 230/69 kV C.GRANDE II TR3 PB | RBF | FT TR 230/69 kV C.GRANDE II TR3 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$410,719.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV TR 230/69 kV C.GRANDE II TR3 PB | RBF | FT TR 230/69 kV C.GRANDE II TR3 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/14/2018 | 5/2/2042 | R$24,202.51 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV TR 230/26 kV C.GRANDE II TR1 PB CE1/CE2 | RB | FT CE 100/-0 Mvar C.GRANDE II CE1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$151,198.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV TR 230/26 kV C.GRANDE II TR1 PB CE1/CE2 | RB | FT CE 100/-0 Mvar C.GRANDE II CE1 PB | 061/2001 | IPCA | RBNI | REA 7761/2019 | 4/29/2019 | 4/7/2040 | R$22,019.37 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DO SISTEMA DE PARTIDA E PARADA DO COMPENSADOR ESTÁTICO. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV TR 230/26 kV C.GRANDE II TR1 PB CE1/CE2 | RB | FT CE 100/-0 Mvar C.GRANDE II CE1 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/1/2021 | 4/28/2049 | R$89,676.18 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV TR 230/138 kV C.GRANDE II TR2 PB | RBF | FT TR 230/138 kV C.GRANDE II TR2 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV TR 230/138 kV C.GRANDE II TR2 PB | RBF | FT TR 230/138 kV C.GRANDE II TR2 PB | 061/2001 | IPCA | RMEL | REN 443/2011 | 11/1/2017 | 11/17/2050 | R$108,749.72 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE DISJUNTOR, POSIÇÃO 14T2 DA SE C.GRANDE II * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV TR 230/138 kV C.GRANDE II TR2 PB | RBF | FT TR 230/138 kV C.GRANDE II TR2 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/2/2021 | 1/1/2045 | R$24,898.99 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV TR 230/138 kV C.GRANDE II TR1 PB | RBF | FT TR 230/138 kV C.GRANDE II TR1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV TR 230/138 kV C.GRANDE II TR1 PB | RBF | FT TR 230/138 kV C.GRANDE II TR1 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/5/2018 | 10/4/2051 | R$159,268.54 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV RTB 230 kV 30 Mvar C.GRANDE II RT2 PB | RB | FT RTB 230 kV 30 MVAr C.GRANDE II RT2 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$140,466.92 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV RTB 230 kV 30 Mvar C.GRANDE II RT2 PB | RB | FT RTB 230 kV 30 MVAr C.GRANDE II RT2 PB | 061/2001 | IPCA | RBNI | REA 7761/2019 | 7/28/2020 | 7/27/2048 | R$ 742.82 | 6/1/2025 | Ativa | Implantação de Sistema para acesso remoto a dispositivos de Proteção, Controle e Automação. Sistema composto de Painel com PCs Industriais (Concentrador e Firewall), Receptor GPS, Switch Gerenciável etc. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV RTB 230 kV 10 Mvar C.GRANDE II RT1 PB | RB | FT RTB 230 kV 10 Mvar C.GRANDE II RT1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$140,466.92 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV RTB 230 kV 10 Mvar C.GRANDE II RT1 PB | RB | FT RTB 230 kV 10 Mvar C.GRANDE II RT1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$394,173.90 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV RTB 230 kV 10 Mvar C.GRANDE II RT1 PB | RB | FT RTB 230 kV 10 Mvar C.GRANDE II RT1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$363,380.18 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV RTB 230 kV 10 Mvar C.GRANDE II RT1 PB | RB | FT RTB 230 kV 10 Mvar C.GRANDE II RT1 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/23/2021 | 3/14/2047 | R$32,959.39 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV BC 230 kV 50,5 Mvar C.GRANDE II BC1 PB | RB | FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$166,750.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV BC 230 kV 50,5 Mvar C.GRANDE II BC1 PB | RB | FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$467,928.80 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV BC 230 kV 50,5 Mvar C.GRANDE II BC1 PB | RB | FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$431,373.18 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV BC 230 kV 50,5 Mvar C.GRANDE II BC1 PB | RB | FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB | 061/2001 | IPCA | RMEL | REN 443/2011 | 11/22/2017 | 12/8/2050 | R$108,927.94 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE DISJUNTOR, POSIÇÃO 14H1 DA SE CAMPINA GRANDE II * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV BC 230 kV 50,5 Mvar C.GRANDE II BC1 PB | RB | FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2021 | 1/4/2051 | R$18,816.60 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 230 kV BC 230 kV 50,5 Mvar C.GRANDE II BC1 PB | RB | FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB | 061/2001 | IPCA | RBNI | REA 7761/2019 | 7/28/2020 | 7/27/2048 | R$ 371.41 | 6/1/2025 | Ativa | Implantação de Sistema para acesso remoto a dispositivos de Proteção, Controle e Automação. Sistema composto de Painel com PCs Industriais (Concentrador e Firewall), Receptor GPS, Switch Gerenciável etc. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 138 kV TR 230/138 kV C.GRANDE II TR2 PB | RBF | FT TR 230/138 kV C.GRANDE II TR2 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$112,381.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 138 kV TR 230/138 kV C.GRANDE II TR2 PB | RBF | FT TR 230/138 kV C.GRANDE II TR2 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$315,361.86 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 138 kV TR 230/138 kV C.GRANDE II TR2 PB | RBF | FT TR 230/138 kV C.GRANDE II TR2 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$290,725.10 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 138 kV TR 230/138 kV C.GRANDE II TR2 PB | RBF | FT TR 230/138 kV C.GRANDE II TR2 PB | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/18/2016 | 5/21/2046 | R$10,985.41 | 6/1/2025 | Ativa | Substituído TC AKOF230 com desgaste prematuro. Posição Operacional: 93T2-A/CGD. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 138 kV TR 230/138 kV C.GRANDE II TR2 PB | RBF | FT TR 230/138 kV C.GRANDE II TR2 PB | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/18/2016 | 5/21/2046 | R$10,985.41 | 6/1/2025 | Ativa | Substituído TC AKOF230 com desgaste prematuro. Posição Operacional: 93T2-B/CGD. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 138 kV TR 230/138 kV C.GRANDE II TR2 PB | RBF | FT TR 230/138 kV C.GRANDE II TR2 PB | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/18/2016 | 5/21/2046 | R$10,985.41 | 6/1/2025 | Ativa | Substituído TC AKOF230 com desgaste prematuro. Posição Operacional: 93T2-C/CGD. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 138 kV TR 230/138 kV C.GRANDE II TR2 PB | RBF | FT TR 230/138 kV C.GRANDE II TR2 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/2/2021 | 1/1/2045 | R$15,166.94 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 138 kV TR 230/138 kV C.GRANDE II TR1 PB | RBF | FT TR 230/138 kV C.GRANDE II TR1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$112,381.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 138 kV TR 230/138 kV C.GRANDE II TR1 PB | RBF | FT TR 230/138 kV C.GRANDE II TR1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$315,361.86 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 138 kV TR 230/138 kV C.GRANDE II TR1 PB | RBF | FT TR 230/138 kV C.GRANDE II TR1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$290,725.10 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 138 kV TR 230/138 kV C.GRANDE II TR1 PB | RBF | FT TR 230/138 kV C.GRANDE II TR1 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/13/2021 | 5/12/2045 | R$15,354.20 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 13,8 kV TR 230/138 kV C.GRANDE II TR2 PB | RBF | FT TR 230/138 kV C.GRANDE II TR2 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$48,477.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 13,8 kV TR 230/138 kV C.GRANDE II TR1 PB 16T1 | RBF | FT TR 230/138 kV C.GRANDE II TR1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 13,8 kV TR 230/138 kV C.GRANDE II TR1 PB 16T1 | RBF | FT TR 230/138 kV C.GRANDE II TR1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$125,341.16 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 13,8 kV TR 230/138 kV C.GRANDE II TR1 PB 16T1 | RBF | FT TR 230/138 kV C.GRANDE II TR1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$115,549.23 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 13,8 kV TR 230/138 kV C.GRANDE II TR1 PB 11T1 | RBF | FT TR 230/138 kV C.GRANDE II TR1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 13,8 kV RTB 13,8 kV 5 Mvar C.GRANDE II RT2 PB | RBF | FT RTB 13,8 kV 5 MVAr C.GRANDE II RT2 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,598.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 13,8 kV RTB 13,8 kV 5 Mvar C.GRANDE II RT1 PB | RBF | FT RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,598.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 13,8 kV RTB 13,8 kV 5 Mvar C.GRANDE II RT1 PB | RBF | FT RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,662.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | MC 13,8 kV CS 20/-10 Mvar C.GRANDE II CS1 PB | RBF | FT CS 20/-10 MVAr C.GRANDE II CS1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$60,394.36 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | IB 69 kV MG 230 kV C.GRANDE II MG1 PB IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | IB 230 kV MG 230 kV C.GRANDE II MG1 PB IB3 | RB | FT MG 230 kV C.GRANDE II MG1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,085.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | IB 230 kV MG 230 kV C.GRANDE II MG1 PB IB2 | RB | FT MG 230 kV C.GRANDE II MG1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,085.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | IB 230 kV MG 230 kV C.GRANDE II MG1 PB IB1 | RB | FT MG 230 kV C.GRANDE II MG1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,837.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | IB 138 kV MG 230 kV C.GRANDE II MG1 PB IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$86,825.51 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | IB 138 kV MG 230 kV C.GRANDE II MG1 PB IB1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$243,647.04 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | IB 138 kV MG 230 kV C.GRANDE II MG1 PB IB1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$224,612.81 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 69 kV C.GRANDE II QUEIMADAS | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 69 kV C.GRANDE II QUEIMADAS | DIT | 061/2001 | IPCA | RCDM | REA 7761/2019 | 7/28/2020 | 7/27/2048 | R$ 371.41 | 6/1/2025 | Ativa | Implantação de Sistema para acesso remoto a dispositivos de Proteção, Controle e Automação. Sistema composto de Painel com PCs Industriais (Concentrador e Firewall), Receptor GPS, Switch Gerenciável etc. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 69 kV C.GRANDE II JUAZEIRINHO | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 69 kV C.GRANDE II JUAZEIRINHO | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 69 kV C.GRANDE II ESPERANCA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 69 kV C.GRANDE II ESPERANCA | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/10/2015 | 10/9/2030 | R$ 654.37 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J3-6/7.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 69 kV C.GRANDE II ESPERANCA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 69 kV C.GRANDE II EMBRATEX | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 69 kV C.GRANDE II EMBRATEX | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 3/31/2017 | 3/30/2050 | R$24,048.76 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE CHAVE SECCIONADORA, POSIÇÃO 32J5-5 DA SUB CAMPINA GRANDE II * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 69 kV C.GRANDE II C.GRANDE I | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 69 kV C.GRANDE II C.GRANDE I | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/9/2015 | 10/8/2030 | R$ 327.12 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J2-5.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 69 kV C.GRANDE II C.GRANDE I | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/8/2015 | 10/7/2030 | R$ 327.06 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J2-6.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 69 kV C.GRANDE II BOQUEIRAO | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 69 kV C.GRANDE II BOA VISTA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 69 kV C.GRANDE II BELA VISTA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 69 kV C.GRANDE II BELA VISTA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 69 kV C.GRANDE II AEROCLUBE | DIT | 061/2001 | IPCA | RCDM | REN 905/2020 | 12/11/2014 | 5/19/2045 | R$415,853.50 | 6/1/2025 | Ativa | Instalar um módulo de entrada de linha 69kV, na SE C.GRANDE II, arranjo barra principal e transferência, destino Aeroclube C-1 - 02J2 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB | RB | FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB | RB | FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$612,763.88 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB | RB | FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$564,893.43 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB | RB | FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/7/2020 | 1/27/2039 | R$54,496.08 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$612,763.88 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$564,893.43 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RMEL | REN 443/2011 | 7/12/2017 | 7/15/2047 | R$18,591.77 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE ISOLADORES DE VIDRO POR PORCELANA, EM ATENDIMENTO A RECOMENDAÇÃO RAP ONS 0053/2013, DA CHAVE SECCIONADORA, POSIÇÃO 34C1-5 DA SE CAMPINA GRANDE II * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/31/2020 | 8/30/2035 | R$44,984.46 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV PAU FERRO /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV PAU FERRO /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV PAU FERRO /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV PAU FERRO /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RBNI | REA 2040/2009 | 1/5/2016 | 5/15/2048 | R$150,556.21 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 230 kV associadas ao disjuntor 14C4 INCLUIDA NO CICLO 2016/2017 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV PAU FERRO /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV PAU FERRO /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RMEL | REN 443/2011 | 2/14/2016 | 2/16/2046 | R$12,542.06 | 6/1/2025 | Ativa | Substituído TPC CVE230 com vida regulatória esgotada. Posição Operacional: 84C4-B/CGD. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV PAU FERRO /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV PAU FERRO /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RMEL | REN 443/2011 | 2/14/2016 | 2/16/2046 | R$12,542.06 | 6/1/2025 | Ativa | Substituído TPC CVE230 com vida regulatória esgotada. Posição Operacional: 84C4-C/CGD. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV PAU FERRO /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV PAU FERRO /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/3/2020 | 8/3/2048 | R$208,432.05 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV PAU FERRO /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV PAU FERRO /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RBNI | REA 7761/2019 | 7/28/2020 | 7/27/2048 | R$ 371.41 | 6/1/2025 | Ativa | Implantação de Sistema para acesso remoto a dispositivos de Proteção, Controle e Automação. Sistema composto de Painel com PCs Industriais (Concentrador e Firewall), Receptor GPS, Switch Gerenciável etc. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RMEL | REN 443/2011 | 1/30/2016 | 2/1/2046 | R$12,525.07 | 6/1/2025 | Ativa | Substituído TPC CVE245 com desgaste prematuro com vazamento de óleo na coluna capacitiva. Posição Operacional: 84L3-B/CGD. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/1/2021 | 7/18/2045 | R$328,361.68 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RBNI | REA 7761/2019 | 7/28/2020 | 7/27/2048 | R$ 371.41 | 6/1/2025 | Ativa | Implantação de Sistema para acesso remoto a dispositivos de Proteção, Controle e Automação. Sistema composto de Painel com PCs Industriais (Concentrador e Firewall), Receptor GPS, Switch Gerenciável etc. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB | RB | FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB | 061/2001 | IPCA | RBNI | REA 3208/2011 | 12/9/2019 | 12/8/2034 | R$2,496.50 | 6/1/2025 | Ativa | T2011-151 | Adequar, na SE Campina Grande II, o módulo de entrada de linha do circuito 2 da LT 230 kV Campina Grande II / Extremoz II originado do seccionamento do circuito 2 da LT 230 kV Campina II / Natal III. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB | RB | FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB | RB | FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$612,763.88 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB | RB | FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$564,893.43 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB | RB | FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB | RB | FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$612,763.88 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB | RB | FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$564,893.43 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB | RB | FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/26/2018 | 2/25/2051 | R$13,245.75 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-1 PB | RB | FT LT 230 kV C.GRANDE III /C.GRANDE II C-1 PB | 008/2011 | IPCA | RBL | CC 008/2011 | 5/13/2015 | 10/13/2041 | R$323,671.58 | 6/1/2025 | Ativa | T2011-180-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN | RB | FT LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN | RB | FT LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/27/2020 | 10/10/2051 | R$188,622.37 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN | RB | FT LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN | 061/2001 | IPCA | RBNI | REA 7761/2019 | 7/28/2020 | 7/27/2048 | R$ 371.41 | 6/1/2025 | Ativa | Implantação de Sistema para acesso remoto a dispositivos de Proteção, Controle e Automação. Sistema composto de Painel com PCs Industriais (Concentrador e Firewall), Receptor GPS, Switch Gerenciável etc. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN | RB | FT LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN | RB | FT LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN | 061/2001 | IPCA | RBNI | REA 3578/2012 | 11/21/2020 | 11/20/2053 | R$160,289.60 | 6/1/2025 | Ativa | Substituição do disjuntor Nº 14V2 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN | RB | FT LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN | 061/2001 | IPCA | RBNI | REA 7761/2019 | 7/28/2020 | 7/27/2048 | R$ 371.41 | 6/1/2025 | Ativa | Implantação de Sistema para acesso remoto a dispositivos de Proteção, Controle e Automação. Sistema composto de Painel com PCs Industriais (Concentrador e Firewall), Receptor GPS, Switch Gerenciável etc. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 230 kV C.GRANDE II LT 230 kV C.GRANDE II /COTEMINAS C-1 PB | RB | FT LT 230 kV C.GRANDE II /COTEMINAS C-1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /SANTA CRUZ II C-1 PB/RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$167,571.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /SANTA CRUZ II C-1 PB/RN | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$470,234.30 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /SANTA CRUZ II C-1 PB/RN | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$433,498.57 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /SANTA CRUZ II C-1 PB/RN | DIT | 061/2001 | IPCA | RCDM | REA 4809/2014 | 2/17/2017 | 10/9/2047 | R$66,977.90 | 6/1/2025 | Ativa | EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /SANTA CRUZ II C-1 PB/RN * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /SANTA CRUZ II C-1 PB/RN | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/8/2021 | 9/22/2038 | R$44,487.62 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /PILOES C-1 PB | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$167,571.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /PILOES C-1 PB | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$470,234.30 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /PILOES C-1 PB | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$433,498.57 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /PILOES C-1 PB | DIT | 061/2001 | IPCA | RCDM | REA 4809/2014 | 2/17/2017 | 10/9/2047 | R$66,977.90 | 6/1/2025 | Ativa | EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /PILOES C-1 PB * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | C.GRANDE II | EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /PILOES C-1 PB | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/31/2013 | 2/18/2031 | R$15,339.67 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | C.GRANDE II | CS 20/-10 Mvar C.GRANDE II CS1 PB | RBF | FT CS 20/-10 MVAr C.GRANDE II CS1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$767,380.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | CE 100/-0 Mvar C.GRANDE II CE2 PB | RB | FT CE 100/-0 Mvar C.GRANDE II CE1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,267,061.99 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | CE 100/-0 Mvar C.GRANDE II CE2 PB | RB | FT CE 100/-0 Mvar C.GRANDE II CE1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,361,759.00 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | CE 100/-0 Mvar C.GRANDE II CE2 PB | RB | FT CE 100/-0 Mvar C.GRANDE II CE1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 5,864,764.52 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | CE 100/-0 Mvar C.GRANDE II CE2 PB | RB | FT CE 100/-0 Mvar C.GRANDE II CE1 PB | 061/2001 | IPCA | RMEL | REN 443/2011 | 3/16/2017 | 3/15/2050 | R$15,350.17 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE DISJUNTOR DE BANCO, DO COMPENSADOR ESTÁTICO 09Q2 34,5 kV * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | CE 100/-0 Mvar C.GRANDE II CE2 PB | RB | FT CE 100/-0 Mvar C.GRANDE II CE1 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/6/2017 | 9/9/2047 | R$29,366.99 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | CE 100/-0 Mvar C.GRANDE II CE1 PB | RB | FT CE 100/-0 Mvar C.GRANDE II CE1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,267,061.99 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | CE 100/-0 Mvar C.GRANDE II CE1 PB | RB | FT CE 100/-0 Mvar C.GRANDE II CE1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,361,759.00 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | CE 100/-0 Mvar C.GRANDE II CE1 PB | RB | FT CE 100/-0 Mvar C.GRANDE II CE1 PB | 061/2001 | IPCA | RMEL | REN 443/2011 | 3/16/2017 | 3/15/2050 | R$15,350.17 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE DISJUNTOR DE BANCO, DO COMPENSADOR ESTÁTICO 09Q1 34,5 kV * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | CE 100/-0 Mvar C.GRANDE II CE1 PB | RB | FT CE 100/-0 Mvar C.GRANDE II CE1 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/9/2019 | 6/11/2049 | R$88,201.98 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE II | BC 69 kV 21,2 Mvar C.GRANDE II BC2 PB | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$111,123.49 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | BC 69 kV 21,2 Mvar C.GRANDE II BC2 PB | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$311,831.30 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$107,937.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/11/2013 | 12/10/2033 | R$80,767.57 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS CAPACITORES DE ASCAREL FABRICADO POR INDUCON MODELO BCD25 69KV 02H1. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | C.GRANDE II | BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$302,890.98 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | C.GRANDE II | BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB | DIT | 061/2001 | IPCA | RCDM | REA 7761/2019 | 4/29/2019 | 4/28/2039 | R$66,831.06 | 6/1/2025 | Ativa | Instalação de reatores limitadores de curto-circuito entre o banco de capacitor 02H1 e o respectivo disjuntor de manobra, 12H1. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | C.GRANDE II | BC 230 kV 50,5 Mvar C.GRANDE II BC1 PB | RB | FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$191,630.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE II | BC 230 kV 50,5 Mvar C.GRANDE II BC1 PB | RB | FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$537,748.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | C.GRANDE III | TR 500/230 kV C.GRANDE III TRR1 PB | RB | FT TR 500/230 kV C.GRANDE III TRR1 PB | 008/2011 | IPCA | RBL | CC 008/2011 | 5/13/2015 | 10/13/2041 | R$946,750.01 | 6/1/2025 | Ativa | T2011-180-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | C.GRANDE III | TR 500/230 kV C.GRANDE III TR2 PB | RB | FT TR 500/230 kV C.GRANDE III TR2 PB | 008/2011 | IPCA | RBNI | REA 3738/2012 | 5/13/2015 | 5/12/2050 | R$ 5,879,732.54 | 6/1/2025 | Ativa | T2012-082 | Instalação do 2º banco de autotransformadores 500/230 kV - 3x200 MVA.*Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | C.GRANDE III | TR 500/230 kV C.GRANDE III TR1 PB | RB | FT TR 500/230 kV C.GRANDE III TR1 PB | 008/2011 | IPCA | RBL | CC 008/2011 | 5/13/2015 | 10/13/2041 | R$ 2,840,251.18 | 6/1/2025 | Ativa | T2011-180-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | C.GRANDE III | RTL 500 kV 33,33 Mvar C.GRANDE III RTR2 PB | RB | FT RTL 500 kV 33,33 Mvar C.GRANDE III RTR2 PB | 008/2011 | IPCA | RBL | CC 008/2011 | 5/13/2015 | 10/13/2041 | R$342,950.44 | 6/1/2025 | Ativa | T2011-180-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | C.GRANDE III | RTL 500 kV 100 Mvar C.GRANDE III RTL2 PB | RB | FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB | 008/2011 | IPCA | RBL | CC 008/2011 | 5/13/2015 | 10/13/2041 | R$ 1,028,852.46 | 6/1/2025 | Ativa | T2011-180-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | C.GRANDE III | RTB 500 kV 50 Mvar C.GRANDE III RTR1 PB | RB | FT RTB 500 kV 50 Mvar C.GRANDE III RTR1 PB | 008/2011 | IPCA | RBL | CC 008/2011 | 5/13/2015 | 10/13/2041 | R$393,364.48 | 6/1/2025 | Ativa | T2011-180-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | C.GRANDE III | RTB 500 kV 150 Mvar C.GRANDE III RT6 PB | RB | FT RTB 500 kV 150 Mvar C.GRANDE III RT6 PB | 008/2011 | IPCA | RBNI | REA 11643/2022 | 5/21/2025 | 5/20/2061 | R$ 2,055,465.07 | 6/1/2025 | Ativa | T2022-028 | Instalar, na SE C.GRANDE III, um banco de reatores de barra monofásicos RT6 500 kV - 150 Mvar. | ||
| AXIA Energia Nordeste | C.GRANDE III | RTB 500 kV 150 Mvar C.GRANDE III RT1 PB | RB | FT RTB 500 kV 150 Mvar C.GRANDE III RT1 PB | 008/2011 | IPCA | RBL | CC 008/2011 | 5/13/2015 | 10/13/2041 | R$ 1,180,093.45 | 6/1/2025 | Ativa | T2011-180-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | C.GRANDE III | MG 500 kV C.GRANDE III MG1 PB | RB | FT MG 500 kV C.GRANDE III MG1 PB | 008/2011 | IPCA | RBNI | REA 3738/2012 | 5/13/2015 | 5/12/2046 | R$357,352.38 | 6/1/2025 | Ativa | T2012-082 | Complementação do módulo de infraestrutura geral 500 kV com a instalação de um módulo de infraestrutura de manobra 500 kV, arranjo disjuntor e meio, e um módulo de infraestrutura de manobra 230 kV, arranjo barra dupla a 4 chaves.*Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | C.GRANDE III | MG 500 kV C.GRANDE III MG1 PB | RB | FT MG 500 kV C.GRANDE III MG1 PB | 008/2011 | IPCA | RBL | CC 008/2011 | 5/13/2015 | 10/13/2041 | R$ 1,204,961.38 | 6/1/2025 | Ativa | T2011-180-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | C.GRANDE III | MC 500 kV TR 500/230 kV C.GRANDE III TR2 PB | RB | FT TR 500/230 kV C.GRANDE III TR2 PB | 008/2011 | IPCA | RBNI | REA 3738/2012 | 5/13/2015 | 5/12/2043 | R$ 1,380,103.36 | 6/1/2025 | Ativa | T2012-082 | Instalação de um módulo de conexão em 500 kV, arranjo disjuntor e meio, para o 2º banco de autotransformadores 500/230 kV - 3x200 MVA.*Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | C.GRANDE III | MC 500 kV TR 500/230 kV C.GRANDE III TR1 PB | RB | FT TR 500/230 kV C.GRANDE III TR1 PB | 008/2011 | IPCA | RBL | CC 008/2011 | 5/13/2015 | 10/13/2041 | R$627,283.87 | 6/1/2025 | Ativa | T2011-180-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | C.GRANDE III | MC 500 kV RTL 500 kV 100 Mvar C.GRANDE III RTL2 PB | RB | FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB | 008/2011 | IPCA | RBL | CC 008/2011 | 5/13/2015 | 10/13/2041 | R$375,557.86 | 6/1/2025 | Ativa | T2011-180-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | C.GRANDE III | MC 500 kV RTB 500 kV 150 Mvar C.GRANDE III RT6 PB | RB | FT RTB 500 kV 150 Mvar C.GRANDE III RT6 PB | 008/2011 | IPCA | RBNI | REA 11643/2022 | 5/21/2025 | 5/20/2054 | R$ 1,656,615.83 | 6/1/2025 | Ativa | T2022-028 | Instalar, na SE C.GRANDE III, um módulo de conexão com disjuntor, em 500kV,para o reator de barra RT6 500kV - 150 Mvar. | ||
| AXIA Energia Nordeste | C.GRANDE III | MC 500 kV RTB 500 kV 150 Mvar C.GRANDE III RT1 PB | RB | FT RTB 500 kV 150 Mvar C.GRANDE III RT1 PB | 008/2011 | IPCA | RBL | CC 008/2011 | 5/13/2015 | 10/13/2041 | R$586,206.52 | 6/1/2025 | Ativa | T2011-180-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | C.GRANDE III | MC 230 kV TR 500/230 kV C.GRANDE III TR2 PB | RB | FT TR 500/230 kV C.GRANDE III TR2 PB | 008/2011 | IPCA | RBNI | REA 3738/2012 | 5/13/2015 | 5/12/2039 | R$544,317.73 | 6/1/2025 | Ativa | T2012-082 | Instalação de um módulo de conexão em 230 kV, arranjo barra dupla a 4 chaves, para o 2º banco de autotransformadores 500/230 kV - 3x200 MVA.*Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | C.GRANDE III | MC 230 kV TR 500/230 kV C.GRANDE III TR1 PB | RB | FT TR 500/230 kV C.GRANDE III TR1 PB | 008/2011 | IPCA | RBL | CC 008/2011 | 5/13/2015 | 10/13/2041 | R$230,553.45 | 6/1/2025 | Ativa | T2011-180-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | C.GRANDE III | IB 500 kV MG 500 kV C.GRANDE III MG1 PB IB2 | RB | FT MG 500 kV C.GRANDE III MG1 PB | 008/2011 | IPCA | RBL | CC 008/2011 | 5/13/2015 | 10/13/2041 | R$670,964.90 | 6/1/2025 | Ativa | T2011-180-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | C.GRANDE III | IB 500 kV MG 500 kV C.GRANDE III MG1 PB IB1 | RB | FT MG 500 kV C.GRANDE III MG1 PB | 008/2011 | IPCA | RBL | CC 008/2011 | 5/13/2015 | 10/13/2041 | R$670,964.90 | 6/1/2025 | Ativa | T2011-180-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | C.GRANDE III | IB 230 kV MG 500 kV C.GRANDE III MG1 PB IB1 | RB | FT MG 500 kV C.GRANDE III MG1 PB | 008/2011 | IPCA | RBL | CC 008/2011 | 5/13/2015 | 10/13/2041 | R$174,707.11 | 6/1/2025 | Ativa | T2011-180-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | C.GRANDE III | EL 500 kV C.GRANDE III LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB | RB | FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB | 008/2011 | IPCA | RBL | CC 008/2011 | 5/13/2015 | 10/13/2041 | R$703,441.69 | 6/1/2025 | Ativa | T2011-180-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | C.GRANDE III | EL 230 kV C.GRANDE III LT 230 kV C.GRANDE III /RIACHAO II C-1 PB/RN | RB | FT LT 230 kV C.GRANDE III /RIACHAO II C-1 PB/RN | 061/2001 | IPCA | RBNI | REA 10226/2021 | 1/27/2017 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla a quatro chaves, na subestação Campina Grande III, associada à linha de transmissão 230 kV Campina Grande III – Extremoz II C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE III | EL 230 kV C.GRANDE III LT 230 kV C.GRANDE III /RIACHAO II C-1 PB/RN | RB | FT LT 230 kV C.GRANDE III /RIACHAO II C-1 PB/RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/5/2022 | 5/4/2037 | R$2,474.60 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE III | EL 230 kV C.GRANDE III LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN | RB | FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN | 061/2001 | IPCA | RBNI | REA 10226/2021 | 1/27/2017 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla a quatro chaves, na subestação Campina Grande III, associada à linha de transmissão 230 kV Campina Grande III – Extremoz II C2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE III | EL 230 kV C.GRANDE III LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB | RB | FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB | 061/2001 | IPCA | RBNI | REA 10226/2021 | 1/27/2017 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla a quatro chaves,, na subestação Campina Grande III, associada à linha de transmissão 230 kV Campina Grande II – Campina Grande III C3. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE III | EL 230 kV C.GRANDE III LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB | RB | FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB | 061/2001 | IPCA | RBNI | REA 10226/2021 | 1/27/2017 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla a quatro chaves, na subestação Campina Grande III, associada à linha de transmissão 230 kV Campina Grande II – Campina Grande III C2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | C.GRANDE III | EL 230 kV C.GRANDE III LT 230 kV C.GRANDE III /C.GRANDE II C-1 PB | RB | FT LT 230 kV C.GRANDE III /C.GRANDE II C-1 PB | 008/2011 | IPCA | RBL | CC 008/2011 | 5/13/2015 | 10/13/2041 | R$323,671.58 | 6/1/2025 | Ativa | T2011-180-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Sul | C.MOURAO | MG 230 kV C.MOURAO MG1 PR | RB | FT MG 230 kV C.MOURAO MG1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$376,941.44 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.MOURAO | MG 230 kV C.MOURAO MG1 PR | RB | FT MG 230 kV C.MOURAO MG1 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 10/11/2021 | 7/13/2038 | R$124,978.50 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | C.MOURAO | MC 230 kV TR 230/138 kV C.MOURAO TR1 PR | RBF | FT TR 230/138 kV C.MOURAO TR1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$126,634.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.MOURAO | MC 230 kV TR 230/138 kV C.MOURAO TR1 PR | RBF | FT TR 230/138 kV C.MOURAO TR1 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 7/31/2019 | 7/30/2052 | R$96,389.98 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | C.MOURAO | IB 230 kV MG 230 kV C.MOURAO MG1 PR IB1 | RB | FT MG 230 kV C.MOURAO MG1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$100,223.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.MOURAO | IB 230 kV MG 230 kV C.MOURAO MG1 PR IB1 | RB | FT MG 230 kV C.MOURAO MG1 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 10/19/2022 | 10/21/2052 | R$51,610.70 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | C.MOURAO | EL 230 kV C.MOURAO LT 230 kV C.MOURAO /S. OSORIO C-2 PR | RB | FT LT 230 kV C.MOURAO /S. OSORIO C-2 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.MOURAO | EL 230 kV C.MOURAO LT 230 kV C.MOURAO /S. OSORIO C-2 PR | RB | FT LT 230 kV C.MOURAO /S. OSORIO C-2 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 7/31/2019 | 7/30/2052 | R$96,389.98 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | C.MOURAO | EL 230 kV C.MOURAO LT 230 kV C.MOURAO /S. OSORIO C-1 PR | RB | FT LT 230 kV C.MOURAO /S. OSORIO C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.MOURAO | EL 230 kV C.MOURAO LT 230 kV C.MOURAO /S. OSORIO C-1 PR | RB | FT LT 230 kV C.MOURAO /S. OSORIO C-1 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/31/2020 | 6/8/2052 | R$121,620.90 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | C.MOURAO | EL 230 kV C.MOURAO LT 230 kV C.MOURAO /S. OSORIO C-1 PR | RB | FT LT 230 kV C.MOURAO /S. OSORIO C-1 PR | 057/2001 | IPCA | RBNI | DSP 1425/2021 | 3/22/2021 | 3/21/2036 | R$82,149.34 | 6/1/2025 | Ativa | Substituição dos painéis da proteção Principal, Alternada, Falha de Disjuntor, e dos cabos de controle e potência associados, referente a LT 230 kV C. Mourão - Salto Osório C-2.. Fim de vida útil e obsolescência. Riscos de danos às instalações devido à perda de confiabilidade. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | C.MOURAO | EL 230 kV C.MOURAO LT 230 kV C.MOURAO /MARINGA C-1 PR | RB | FT LT 230 kV C.MOURAO /MARINGA C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.MOURAO | EL 230 kV C.MOURAO LT 230 kV C.MOURAO /MARINGA C-1 PR | RB | FT LT 230 kV C.MOURAO /MARINGA C-1 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 12/1/2019 | 10/27/2051 | R$147,778.25 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | C.MOURAO | EL 230 kV C.MOURAO LT 230 kV C.MOURAO /APUCARANA C-1 PR | RB | FT LT 230 kV C.MOURAO /APUCARANA C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.MOURAO | EL 230 kV C.MOURAO LT 230 kV C.MOURAO /APUCARANA C-1 PR | RB | FT LT 230 kV C.MOURAO /APUCARANA C-1 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 11/22/2019 | 11/3/2051 | R$144,694.01 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | TR 500/230 kV C.NOVOS TRR1 SC | RB | FT TR 500/230 kV C.NOVOS TRR1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$558,003.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | TR 500/230 kV C.NOVOS TR7 SC | RB | FT TR 500/230 kV C.NOVOS TR7 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,674,009.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | TR 500/230 kV C.NOVOS TR2 SC | RB | FT TR 500/230 kV C.NOVOS TR2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,674,009.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | TR 500/230 kV C.NOVOS TR1 SC | RB | FT TR 500/230 kV C.NOVOS TR1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,674,009.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | TR 230/138 kV C.NOVOS TR5 SC | RBF | FT TR 230/138 kV C.NOVOS TR5 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$377,367.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | TR 230/138 kV C.NOVOS TR5 SC | RBF | FT TR 230/138 kV C.NOVOS TR5 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$662,310.72 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | TR 230/138 kV C.NOVOS TR5 SC | RBF | FT TR 230/138 kV C.NOVOS TR5 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$560,988.73 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | TR 230/138 kV C.NOVOS TR4 SC | RBF | FT TR 230/138 kV C.NOVOS TR4 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$377,367.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | TR 230/138 kV C.NOVOS TR4 SC | RBF | FT TR 230/138 kV C.NOVOS TR4 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$662,310.72 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | TR 230/138 kV C.NOVOS TR4 SC | RBF | FT TR 230/138 kV C.NOVOS TR4 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$560,988.73 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | TR 230/138 kV C.NOVOS TR3 SC | RBF | FT TR 230/138 kV C.NOVOS TR3 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$377,367.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | TR 230/138 kV C.NOVOS TR3 SC | RBF | FT TR 230/138 kV C.NOVOS TR3 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$662,310.72 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | TR 230/138 kV C.NOVOS TR3 SC | RBF | FT TR 230/138 kV C.NOVOS TR3 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$560,988.73 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | RTL 500 kV 75 Mvar C.NOVOS RT4 SC | RB | FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS | 005/2006 | IPCA | RBL | CC 005/2006 | 4/27/2006 | 4/27/2036 | R$920,995.25 | 6/1/2025 | Ativa | Contrato de Concessão nº 005/2006 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | C.NOVOS | RTL 500 kV 75 Mvar C.NOVOS RT4 SC | RB | FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS | 005/2006 | IPCA | RMEL | REN 443/2011 | 6/13/2014 | 6/11/2047 | R$ 393.16 | 6/1/2025 | Ativa | Substituição das flexitestes dos circuitos Nova Santa Rita, Biguaçu e Areia, dos reatores 3 e 4, do TF7 e das barras. (RAP INCLUÍDA NO RECURSO CONTRA A REH 2.258/2017) *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Sul | C.NOVOS | RTL 500 kV 25 Mvar C.NOVOS RTR1 SC | RB | FT RTL 500 kV 25 Mvar C.NOVOS RTR1 SC | 005/2006 | IPCA | RBL | CC 005/2006 | 4/27/2006 | 4/27/2036 | R$306,998.95 | 6/1/2025 | Ativa | Contrato de Concessão nº 005/2006 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | C.NOVOS | RTL 500 kV 150 Mvar C.NOVOS RT3 SC | RB | FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC | 010/2005 | IGPM | RBL | CC 010/2005 | 9/17/2006 | 3/4/2035 | R$ 1,901,172.77 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2005 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | C.NOVOS | RTL 500 kV 150 Mvar C.NOVOS RT3 SC | RB | FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC | 010/2005 | IGPM | RMEL | REN 643/2014 | 6/13/2014 | 6/12/2050 | R$ 707.23 | 6/1/2025 | Ativa | Substituição das flexitestes dos circuitos Nova Santa Rita, Biguaçu e Areia, dos reatores 3 e 4, do TF7 e das barras * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Sul | C.NOVOS | RTL 500 kV 100 Mvar C.NOVOS RT1 SC | RB | FT RTL 500 kV 100 Mvar C.NOVOS RT1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$583,462.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | RTL 500 kV 100 Mvar C.NOVOS RT1 SC | RB | FT RTL 500 kV 100 Mvar C.NOVOS RT1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,024,023.73 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | RTL 500 kV 100 Mvar C.NOVOS RT1 SC | RB | FT RTL 500 kV 100 Mvar C.NOVOS RT1 SC | 057/2001 | IPCA | RMELP | REA 13930/2023 | R$ 2,740,310.46 | 6/1/2025 | Prevista | T2023-003 | Obra de Substituição Completa - Substituição do reator monofásico, RE1, 525 kV, 3x33,333 Mvar, Fases A, B e C, SE Campos Novos. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 0001170/2021, 0001171/2021 e 0001174/2021. | ||||
| AXIA Energia Sul | C.NOVOS | RTB 500 kV 33,3 Mvar C.NOVOS RTR1 SC | RB | FT RTB 500 kV 33,3 Mvar C.NOVOS RTR1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$194,416.48 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | RTB 500 kV 33,3 Mvar C.NOVOS RTR1 SC | RB | FT RTB 500 kV 33,3 Mvar C.NOVOS RTR1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$341,216.89 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | RTB 500 kV 33,3 Mvar C.NOVOS RTR1 SC | RB | FT RTB 500 kV 33,3 Mvar C.NOVOS RTR1 SC | 057/2001 | IPCA | RMELP | REA 13930/2023 | R$913,436.81 | 6/1/2025 | Prevista | T2023-004 | Obra de Substituição Completa - Substituição do reator monofásico, RTR1, 525 kV, 33,333 Mvar, Fase Reserva 1, SE Campos Novos. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 0001178/2021. | ||||
| AXIA Energia Sul | C.NOVOS | RTB 500 kV 100 Mvar C.NOVOS RT2 SC | RB | FT RTB 500 kV 100 Mvar C.NOVOS RT2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$583,462.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | RTB 500 kV 100 Mvar C.NOVOS RT2 SC | RB | FT RTB 500 kV 100 Mvar C.NOVOS RT2 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,024,023.73 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | RTB 500 kV 100 Mvar C.NOVOS RT2 SC | RB | FT RTB 500 kV 100 Mvar C.NOVOS RT2 SC | 057/2001 | IPCA | RMELP | REA 13930/2023 | R$ 2,740,310.46 | 6/1/2025 | Prevista | T2023-005 | Obra de Substituição Completa - Substituição do reator monofásico, RE2, 525 kV, 3x33,333 Mvar, SE Campos Novos. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 0001179/2021, 0001327/2021 e 0001336/2021. | ||||
| AXIA Energia Sul | C.NOVOS | MG 500 kV C.NOVOS MG1 SC | RB | FT MG 500 kV C.NOVOS MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,810,618.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | MG 500 kV C.NOVOS MG1 SC | RB | FT MG 500 kV C.NOVOS MG1 SC | 057/2001 | IPCA | RMEL | REN 643/2014 | 8/13/2014 | 8/12/2031 | R$25,066.42 | 6/1/2025 | Ativa | Substituição de 2 baterias 125-525 Vcc. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | MG 500 kV C.NOVOS MG1 SC | RB | FT MG 500 kV C.NOVOS MG1 SC | 057/2001 | IPCA | RMEL | REN 443/2011 | 4/1/2015 | 3/31/2032 | R$9,532.87 | 6/1/2025 | Ativa | Aquisição e substituição de um banco de baterias de 48 Vcc - Bat1 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | MG 500 kV C.NOVOS MG1 SC | RB | FT MG 500 kV C.NOVOS MG1 SC | 057/2001 | IPCA | RMEL | REN 443/2011 | 4/1/2015 | 3/31/2032 | R$9,532.87 | 6/1/2025 | Ativa | Aquisição e substituição de um banco de baterias de 48 Vcc - Bat2 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | MG 500 kV C.NOVOS MG1 SC | RB | FT MG 500 kV C.NOVOS MG1 SC | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2034 | R$23,439.71 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Areia, Biguaçu, Caxias, Machadinho 1 e Nova Santa Rita para o ONS * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | MG 500 kV C.NOVOS MG1 SC | RB | FT MG 500 kV C.NOVOS MG1 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/13/2020 | 5/9/2040 | R$299,200.34 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | MC 500 kV TR 500/230 kV C.NOVOS TR7 SC | RB | FT TR 500/230 kV C.NOVOS TR7 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$358,630.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | MC 500 kV TR 500/230 kV C.NOVOS TR2 SC | RB | FT TR 500/230 kV C.NOVOS TR2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$358,630.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | MC 500 kV TR 500/230 kV C.NOVOS TR2 SC | RB | FT TR 500/230 kV C.NOVOS TR2 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$629,425.18 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | MC 500 kV TR 500/230 kV C.NOVOS TR2 SC | RB | FT TR 500/230 kV C.NOVOS TR2 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$533,134.11 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | MC 500 kV TR 500/230 kV C.NOVOS TR1 SC | RB | FT TR 500/230 kV C.NOVOS TR1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$358,630.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | MC 500 kV RTL 500 kV 75 Mvar C.NOVOS RT4 SC | RB | FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS | 005/2006 | IPCA | RBL | CC 005/2006 | 4/27/2006 | 4/27/2036 | R$359,956.75 | 6/1/2025 | Ativa | Contrato de Concessão nº 005/2006 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | C.NOVOS | MC 500 kV RTL 500 kV 150 Mvar C.NOVOS RT3 SC | RB | FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC | 010/2005 | IGPM | RBL | CC 010/2005 | 9/17/2006 | 3/4/2035 | R$645,917.84 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2005 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | C.NOVOS | MC 500 kV RTL 500 kV 100 Mvar C.NOVOS RT1 SC | RB | FT RTL 500 kV 100 Mvar C.NOVOS RT1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$217,273.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | MC 500 kV RTB 500 kV 100 Mvar C.NOVOS RT2 SC | RB | FT RTB 500 kV 100 Mvar C.NOVOS RT2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$166,994.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | MC 500 kV RTB 500 kV 100 Mvar C.NOVOS RT2 SC | RB | FT RTB 500 kV 100 Mvar C.NOVOS RT2 SC | 057/2001 | IPCA | RMEL | REN 643/2014 | 1/31/2014 | 1/30/2038 | R$16,539.58 | 6/1/2025 | Ativa | Substituição do para-raios do reator 2. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | MC 230 kV TR 500/230 kV C.NOVOS TR7 SC | RB | FT TR 500/230 kV C.NOVOS TR7 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | MC 230 kV TR 500/230 kV C.NOVOS TR2 SC | RB | FT TR 500/230 kV C.NOVOS TR2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | MC 230 kV TR 500/230 kV C.NOVOS TR2 SC | RB | FT TR 500/230 kV C.NOVOS TR2 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/30/2023 | 1/29/2056 | R$136,071.94 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | MC 230 kV TR 500/230 kV C.NOVOS TR1 SC | RB | FT TR 500/230 kV C.NOVOS TR1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | MC 230 kV TR 230/138 kV C.NOVOS TR5 SC | RBF | FT TR 230/138 kV C.NOVOS TR5 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | MC 230 kV TR 230/138 kV C.NOVOS TR5 SC | RBF | FT TR 230/138 kV C.NOVOS TR5 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$233,385.63 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | MC 230 kV TR 230/138 kV C.NOVOS TR5 SC | RBF | FT TR 230/138 kV C.NOVOS TR5 SC | 057/2001 | IPCA | RBNI | REA 5484/2015 | 9/29/2017 | 9/28/2050 | R$93,987.31 | 6/1/2025 | Ativa | Substituição de 4 disjuntor(es) do(s) vão(s): TIE (752); TF3 230/138 (732); TF4 230/138 (722); TF5 230/138 (712). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | MC 230 kV TR 230/138 kV C.NOVOS TR5 SC | RBF | FT TR 230/138 kV C.NOVOS TR5 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/30/2023 | 1/29/2047 | R$33,654.63 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | MC 230 kV TR 230/138 kV C.NOVOS TR4 SC | RBF | FT TR 230/138 kV C.NOVOS TR4 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | MC 230 kV TR 230/138 kV C.NOVOS TR4 SC | RBF | FT TR 230/138 kV C.NOVOS TR4 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$233,385.63 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | MC 230 kV TR 230/138 kV C.NOVOS TR4 SC | RBF | FT TR 230/138 kV C.NOVOS TR4 SC | 057/2001 | IPCA | RBNI | REA 5484/2015 | 9/29/2017 | 9/28/2050 | R$93,987.31 | 6/1/2025 | Ativa | Substituição de 4 disjuntor(es) do(s) vão(s): TIE (752); TF3 230/138 (732); TF4 230/138 (722); TF5 230/138 (712). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | MC 230 kV TR 230/138 kV C.NOVOS TR4 SC | RBF | FT TR 230/138 kV C.NOVOS TR4 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/30/2023 | 1/29/2047 | R$33,654.63 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | MC 230 kV TR 230/138 kV C.NOVOS TR3 SC | RBF | FT TR 230/138 kV C.NOVOS TR3 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | MC 230 kV TR 230/138 kV C.NOVOS TR3 SC | RBF | FT TR 230/138 kV C.NOVOS TR3 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$233,385.63 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | MC 230 kV TR 230/138 kV C.NOVOS TR3 SC | RBF | FT TR 230/138 kV C.NOVOS TR3 SC | 057/2001 | IPCA | RBNI | REA 5484/2015 | 9/29/2017 | 9/28/2050 | R$93,987.31 | 6/1/2025 | Ativa | Substituição de 4 disjuntor(es) do(s) vão(s): TIE (752); TF3 230/138 (732); TF4 230/138 (722); TF5 230/138 (712). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | MC 138 kV TR 230/138 kV C.NOVOS TR5 SC | RBF | FT TR 230/138 kV C.NOVOS TR5 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$97,233.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | MC 138 kV TR 230/138 kV C.NOVOS TR5 SC | RBF | FT TR 230/138 kV C.NOVOS TR5 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 3/31/2021 | 9/20/2047 | R$35,859.32 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | MC 138 kV TR 230/138 kV C.NOVOS TR4 SC | RBF | FT TR 230/138 kV C.NOVOS TR4 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$97,233.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | MC 138 kV TR 230/138 kV C.NOVOS TR4 SC | RBF | FT TR 230/138 kV C.NOVOS TR4 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/30/2023 | 1/29/2047 | R$20,500.32 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | MC 138 kV TR 230/138 kV C.NOVOS TR3 SC | RBF | FT TR 230/138 kV C.NOVOS TR3 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$97,233.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | IB 500 kV MG 500 kV C.NOVOS MG1 SC IB5 | RB | FT MG 500 kV C.NOVOS MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | IB 500 kV MG 500 kV C.NOVOS MG1 SC IB5 | RB | FT MG 500 kV C.NOVOS MG1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$667,954.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | IB 500 kV MG 500 kV C.NOVOS MG1 SC IB4 | RB | FT MG 500 kV C.NOVOS MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | IB 500 kV MG 500 kV C.NOVOS MG1 SC IB4 | RB | FT MG 500 kV C.NOVOS MG1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$667,954.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | IB 500 kV MG 500 kV C.NOVOS MG1 SC IB3 | RB | FT MG 500 kV C.NOVOS MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | IB 500 kV MG 500 kV C.NOVOS MG1 SC IB2 | RB | FT MG 500 kV C.NOVOS MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | IB 500 kV MG 500 kV C.NOVOS MG1 SC IB1 | RB | FT MG 500 kV C.NOVOS MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | IB 230 kV MG 500 kV C.NOVOS MG1 SC IB1 | RB | FT MG 500 kV C.NOVOS MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,146.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | IB 230 kV MG 500 kV C.NOVOS MG1 SC IB1 | RB | FT MG 500 kV C.NOVOS MG1 SC | 057/2001 | IPCA | RBNI | REA 5484/2015 | 9/29/2017 | 9/28/2050 | R$93,987.31 | 6/1/2025 | Ativa | Substituição de 4 disjuntor(es) do(s) vão(s): TIE (752); TF3 230/138 (732); TF4 230/138 (722); TF5 230/138 (712). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | IB 138 kV MG 500 kV C.NOVOS MG1 SC IB1 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$75,121.98 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | C.NOVOS | EL 525 kV C.NOVOS LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS | RB | FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS | 005/2006 | IPCA | RBL | CC 005/2006 | 4/27/2006 | 4/27/2036 | R$ 1,076,763.58 | 6/1/2025 | Ativa | Contrato de Concessão nº 005/2006 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | C.NOVOS | EL 525 kV C.NOVOS LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS | RB | FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS | 005/2006 | IPCA | RMEL | REN 643/2014 | 6/13/2014 | 6/11/2045 | R$ 421.78 | 6/1/2025 | Ativa | Substituição das flexitestes dos circuitos Nova Santa Rita, Biguaçu e Areia, dos reatores 3 e 4, do TF7 e das barras. (RAP incluída no recurso contra a REH 2.258/2017). *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Sul | C.NOVOS | EL 525 kV C.NOVOS LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS | RB | FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS | 005/2006 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/23/2034 | R$3,133.61 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Areia, Biguaçu, Caxias, Machadinho 1 e Nova Santa Rita para o ONS* Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Sul | C.NOVOS | EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC | RB | FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC | RB | FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC | 057/2001 | IPCA | RMEL | REN 643/2014 | 4/13/2014 | 4/15/2044 | R$59,557.81 | 6/1/2025 | Ativa | Aquisição e substituição de 03 TCs da LT MCH1 550 kV. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC | RB | FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC | 057/2001 | IPCA | RMEL | REN 643/2014 | 7/20/2014 | 7/19/2038 | R$37,326.70 | 6/1/2025 | Ativa | Substituição dos para-raios 525 kV de SiC por ZnO do circuito Machadinho 1. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC | RB | FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$713,154.95 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC | RB | FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2034 | R$2,486.85 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Areia, Biguaçu, Caxias, Machadinho 1 e Nova Santa Rita para o ONS * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC | RB | FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 4/22/2020 | 4/25/2050 | R$31,831.46 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | EL 500 kV C.NOVOS LT 500 kV C.NOVOS /CAXIAS NORTE C-1 SC/RS | RB | FT LT 500 kV C.NOVOS /CAXIAS NORTE C-1 SC/RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | EL 500 kV C.NOVOS LT 500 kV C.NOVOS /CAXIAS NORTE C-1 SC/RS | RB | FT LT 500 kV C.NOVOS /CAXIAS NORTE C-1 SC/RS | 057/2001 | IPCA | RMEL | REN 643/2014 | 2/1/2015 | 2/3/2045 | R$53,174.97 | 6/1/2025 | Ativa | Substituição de 3 TPCs do circuito 525 kV Caxias (LT CAX). Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | EL 500 kV C.NOVOS LT 500 kV C.NOVOS /CAXIAS NORTE C-1 SC/RS | RB | FT LT 500 kV C.NOVOS /CAXIAS NORTE C-1 SC/RS | 057/2001 | IPCA | RMEL | REN 643/2014 | 9/2/2014 | 9/1/2038 | R$37,525.58 | 6/1/2025 | Ativa | Substituição dos para-raios 525 kV de SiC por ZnO do circuito Caxias. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | EL 500 kV C.NOVOS LT 500 kV C.NOVOS /CAXIAS NORTE C-1 SC/RS | RB | FT LT 500 kV C.NOVOS /CAXIAS NORTE C-1 SC/RS | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2034 | R$3,644.12 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Areia, Biguaçu, Caxias, Machadinho 1 e Nova Santa Rita para o ONS * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | EL 500 kV C.NOVOS LT 500 kV C.NOVOS /CAXIAS NORTE C-1 SC/RS | RB | FT LT 500 kV C.NOVOS /CAXIAS NORTE C-1 SC/RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/6/2023 | 3/25/2047 | R$332,793.27 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | EL 500 kV C.NOVOS LT 500 kV C.NOVOS /CAXIAS NORTE C-1 SC/RS | RB | FT LT 500 kV C.NOVOS /CAXIAS NORTE C-1 SC/RS | 057/2001 | IPCA | RBNI | REA 7528/2018 | 1/30/2023 | 2/1/2053 | R$62,012.04 | 6/1/2025 | Ativa | Substituição de Chave Seccionadora tripolar 525 kV, CS1019, referente ao Reator 2 (RT2) da SE C. Novos. Associado à obra são esperadas substituições/adaptações de fundações, suportes, cabos de controle/potência, barramento, conectores e conexão de aterramento.. Final de vida útil. Riscos de danos às instalações devido à perda de confiabilidade. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | EL 500 kV C.NOVOS LT 500 kV AREIA /C.NOVOS C-1 PR/SC | RB | FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | C.NOVOS | EL 500 kV C.NOVOS LT 500 kV AREIA /C.NOVOS C-1 PR/SC | RB | FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC | 057/2001 | IPCA | RMEL | REN 443/2011 | 5/15/2016 | 5/14/2040 | R$40,334.12 | 6/1/2025 | Ativa | Substituição dos Para-Raios 525kV do circuito Areia * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019. *Receita alterada no recurso contra a REH 2.407/2018. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | EL 500 kV C.NOVOS LT 500 kV AREIA /C.NOVOS C-1 PR/SC | RB | FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2034 | R$7,563.06 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Areia, Biguaçu, Caxias, Machadinho 1 e Nova Santa Rita para o ONS * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | C.NOVOS | EL 500 kV C.NOVOS LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC | RB | FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC | 010/2005 | IGPM | RBL | CC 010/2005 | 9/17/2006 | 3/4/2035 | R$ 1,780,533.95 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2005 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | C.NOVOS | EL 500 kV C.NOVOS LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC | RB | FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC | 010/2005 | IGPM | RMEL | REN 443/2011 | 6/13/2014 | 6/12/2045 | R$3,270.26 | 6/1/2025 | Ativa | Substituição das flexitestes dos circuitos Curitiba e Biguaçu e dos TFs 5 e 6.Melhoria incluída no recurso contra a REH 2.258/2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Sul | C.NOVOS | EL 500 kV C.NOVOS LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC | RB | FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC | 010/2005 | IGPM | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2033 | R$3,839.18 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Areia, Biguaçu, Caxias, Machadinho 1 e Nova Santa Rita para o ONS* Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Sul | C.NOVOS | EL 138 kV C.NOVOS LT 138 kV VIDAL R. JR /C.NOVOS C-2 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$144,984.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | C.NOVOS | EL 138 kV C.NOVOS LT 138 kV VIDAL R. JR /C.NOVOS C-2 SC | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$254,458.88 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | C.NOVOS | EL 138 kV C.NOVOS LT 138 kV VIDAL R. JR /C.NOVOS C-2 SC | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 12/20/2021 | 12/19/2054 | R$102,359.56 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | C.NOVOS | EL 138 kV C.NOVOS LT 138 kV VIDAL R. JR /C.NOVOS C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$144,984.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | C.NOVOS | EL 138 kV C.NOVOS LT 138 kV VIDAL R. JR /C.NOVOS C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$254,458.88 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | C.NOVOS | EL 138 kV C.NOVOS LT 138 kV VIDAL R. JR /C.NOVOS C-1 SC | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 6/27/2022 | 5/28/2054 | R$156,824.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | CALADINHO II | TR 230/138 kV CALADINHO II TR2 RO | RBF | FT TR 230/138 kV CALADINHO II TR2 RO | 013/2022 | IPCA | RBL | CC 013/2022 | R$ 1,541,309.23 | 6/1/2025 | Prevista | T2022-127 | SE 230/138 kV Caladinho II; eTrechos de LT em 230 kV entre a SE Caladinho II e a LT 230 kV Coletora Porto Velho – Porto Velho, C2. | 3T25 | |||
| AXIA Energia Norte | CALADINHO II | TR 230/138 kV CALADINHO II TR1 RO | RBF | FT TR 230/138 kV CALADINHO II TR1 RO | 013/2022 | IPCA | RBL | CC 013/2022 | R$ 1,541,309.23 | 6/1/2025 | Prevista | T2022-127 | SE 230/138 kV Caladinho II; eTrechos de LT em 230 kV entre a SE Caladinho II e a LT 230 kV Coletora Porto Velho – Porto Velho, C2. | 3T25 | |||
| AXIA Energia Norte | CALADINHO II | MG 230 kV CALADINHO II MG1 RO | RB | FT MG 230 kV CALADINHO II MG1 RO | 013/2022 | IPCA | RBL | CC 013/2022 | R$ 4,285,024.99 | 6/1/2025 | Prevista | T2022-127 | SE 230/138 kV Caladinho II; eTrechos de LT em 230 kV entre a SE Caladinho II e a LT 230 kV Coletora Porto Velho – Porto Velho, C2. | 3T25 | |||
| AXIA Energia Norte | CALADINHO II | MC 230 kV TR 230/138 kV CALADINHO II TR2 RO | RBF | FT TR 230/138 kV CALADINHO II TR2 RO | 013/2022 | IPCA | RBL | CC 013/2022 | R$ 1,414,593.92 | 6/1/2025 | Prevista | T2022-127 | SE 230/138 kV Caladinho II; eTrechos de LT em 230 kV entre a SE Caladinho II e a LT 230 kV Coletora Porto Velho – Porto Velho, C2. | 3T25 | |||
| AXIA Energia Norte | CALADINHO II | MC 230 kV TR 230/138 kV CALADINHO II TR1 RO | RBF | FT TR 230/138 kV CALADINHO II TR1 RO | 013/2022 | IPCA | RBL | CC 013/2022 | R$ 1,414,593.92 | 6/1/2025 | Prevista | T2022-127 | SE 230/138 kV Caladinho II; eTrechos de LT em 230 kV entre a SE Caladinho II e a LT 230 kV Coletora Porto Velho – Porto Velho, C2. | 3T25 | |||
| AXIA Energia Norte | CALADINHO II | MC 138 kV TR 230/138 kV CALADINHO II TR2 RO | RBF | FT TR 230/138 kV CALADINHO II TR2 RO | 013/2022 | IPCA | RBL | CC 013/2022 | R$ 1,055,908.31 | 6/1/2025 | Prevista | T2022-127 | SE 230/138 kV Caladinho II; eTrechos de LT em 230 kV entre a SE Caladinho II e a LT 230 kV Coletora Porto Velho – Porto Velho, C2. | 3T25 | |||
| AXIA Energia Norte | CALADINHO II | MC 138 kV TR 230/138 kV CALADINHO II TR1 RO | RBF | FT TR 230/138 kV CALADINHO II TR1 RO | 013/2022 | IPCA | RBL | CC 013/2022 | R$ 1,055,908.31 | 6/1/2025 | Prevista | T2022-127 | SE 230/138 kV Caladinho II; eTrechos de LT em 230 kV entre a SE Caladinho II e a LT 230 kV Coletora Porto Velho – Porto Velho, C2. | 3T25 | |||
| AXIA Energia Norte | CALADINHO II | IB 230 kV MG 230 kV CALADINHO II MG1 RO IB1 | RB | FT MG 230 kV CALADINHO II MG1 RO | 013/2022 | IPCA | RBL | CC 013/2022 | R$ 1,123,454.83 | 6/1/2025 | Prevista | T2022-127 | SE 230/138 kV Caladinho II; eTrechos de LT em 230 kV entre a SE Caladinho II e a LT 230 kV Coletora Porto Velho – Porto Velho, C2. | 3T25 | |||
| AXIA Energia Norte | CALADINHO II | IB 138 kV MG 230 kV CALADINHO II MG1 RO IB1 | DIT | 013/2022 | IPCA | RPEC | CC 013/2022 | R$550,108.99 | 6/1/2025 | Prevista | T2022-127 | SE 230/138 kV Caladinho II - DIT | |||||
| AXIA Energia Norte | CALADINHO II | EL 138 kV CALADINHO II DIST1 | DIT | 013/2022 | IPCA | RPEC | CC 013/2022 | R$729,839.47 | 6/1/2025 | Prevista | T2022-127 | SE 230/138 kV Caladinho II - DIT | |||||
| AXIA Energia Nordeste | CAMACARI II | TT 69/13,8 kV CAMACARI II TA2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAMACARI II | TT 69/13,8 kV CAMACARI II TA2 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$248,222.69 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAMACARI II | TT 69/13,8 kV CAMACARI II TA2 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/12/2021 | 8/15/2051 | R$3,833.06 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | CAMACARI II | TT 69/13,8 kV CAMACARI II TA1 BA | DIT | 061/2001 | IPCA | RCDM | REA 3578/2012 | 8/8/2015 | 4/5/2046 | R$180,413.33 | 6/1/2025 | Ativa | Obra de Substituição Completa - Substituição de 1 transformador de aterramento: 02A1. INCLUIDA NO CICLO 2016/2017 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | CAMACARI II | TR 69/13,8 kV CAMACARI II TR8 BA | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | TR 69/13,8 kV CAMACARI II TR8 BA | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$76,466.27 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | TR 69/13,8 kV CAMACARI II TR8 BA | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$70,492.55 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | TR 500/230 kV CAMACARI II TRR1 BA | RB | FT TR 500/230 kV CAMACARI II TRR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$622,465.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | TR 500/230 kV CAMACARI II TRR1 BA | RB | FT TR 500/230 kV CAMACARI II TRR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,746,742.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | TR 500/230 kV CAMACARI II TRR1 BA | RB | FT TR 500/230 kV CAMACARI II TRR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/2/2022 | 3/13/2055 | R$126,357.09 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | TR 500/230 kV CAMACARI II TR4 BA | RB | FT TR 500/230 kV CAMACARI II TR4 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,867,395.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | TR 500/230 kV CAMACARI II TR4 BA | RB | FT TR 500/230 kV CAMACARI II TR4 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/22/2013 | 8/30/2048 | R$27,618.20 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BUCHAS HSP 500 KV TIPO OTF DOS AUTOTRAFOS 05T4 A/B/C. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | TR 500/230 kV CAMACARI II TR4 BA | RB | FT TR 500/230 kV CAMACARI II TR4 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/22/2013 | 8/30/2048 | R$22,969.68 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BUCHAS HSP 230 KV TIPO OTF DOS AUTOTRAFOS 05T4 A/B/C. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | TR 500/230 kV CAMACARI II TR4 BA | RB | FT TR 500/230 kV CAMACARI II TR4 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 5,240,226.18 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | TR 500/230 kV CAMACARI II TR4 BA | RB | FT TR 500/230 kV CAMACARI II TR4 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 4,830,848.29 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | TR 500/230 kV CAMACARI II TR4 BA | RB | FT TR 500/230 kV CAMACARI II TR4 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/18/2021 | 11/25/2056 | R$11,525.41 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | TR 500/230 kV CAMACARI II TR3 BA | RB | FT TR 500/230 kV CAMACARI II TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,867,395.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | TR 500/230 kV CAMACARI II TR3 BA | RB | FT TR 500/230 kV CAMACARI II TR3 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 5,240,226.18 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | TR 500/230 kV CAMACARI II TR3 BA | RB | FT TR 500/230 kV CAMACARI II TR3 BA | 061/2001 | IPCA | RMEL | REA 14107/2023 | 6/13/2023 | 6/12/2058 | R$ 2,503,514.74 | 6/1/2025 | Ativa | T2023-053 | Obra de Substituição Parcial - Substituição de autotransformador, posição 05T3 - Fase C. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 000611/2017 | ||
| AXIA Energia Nordeste | CAMACARI II | TR 500/230 kV CAMACARI II TR3 BA | RB | FT TR 500/230 kV CAMACARI II TR3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/20/2021 | 7/28/2056 | R$28,652.80 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | TR 500/230 kV CAMACARI II TR2 BA | RB | FT TR 500/230 kV CAMACARI II TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,867,395.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | TR 500/230 kV CAMACARI II TR2 BA | RB | FT TR 500/230 kV CAMACARI II TR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 5,240,226.18 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | TR 500/230 kV CAMACARI II TR2 BA | RB | FT TR 500/230 kV CAMACARI II TR2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/10/2021 | 10/18/2056 | R$22,089.11 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | TR 500/230 kV CAMACARI II TR1 BA | RB | FT TR 500/230 kV CAMACARI II TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,867,395.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | TR 500/230 kV CAMACARI II TR1 BA | RB | FT TR 500/230 kV CAMACARI II TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 5,240,226.18 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | TR 500/230 kV CAMACARI II TR1 BA | RB | FT TR 500/230 kV CAMACARI II TR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/12/2021 | 9/19/2056 | R$22,705.94 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | TR 230/69 kV CAMACARI II TR6 BA | RBF | FT TR 230/69 kV CAMACARI II TR6 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | TR 230/69 kV CAMACARI II TR6 BA | RBF | FT TR 230/69 kV CAMACARI II TR6 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | TR 230/69 kV CAMACARI II TR6 BA | RBF | FT TR 230/69 kV CAMACARI II TR6 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/12/2021 | 7/20/2056 | R$6,929.28 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | TR 230/69 kV CAMACARI II TR5 BA | RBF | FT TR 230/69 kV CAMACARI II TR5 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | TR 230/69 kV CAMACARI II TR5 BA | RBF | FT TR 230/69 kV CAMACARI II TR5 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | TR 230/13,8 kV CAMACARI II TRR1 BA | RB | FT TR 230/13,8 kV CAMACARI II TRR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$237,096.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | TR 230/13,8 kV CAMACARI II TRR1 BA | RB | FT TR 230/13,8 kV CAMACARI II TRR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$665,332.22 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | TR 230/13,8 kV CAMACARI II TRR1 BA | RB | FT TR 230/13,8 kV CAMACARI II TRR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$613,355.02 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | TR 230/13,8 kV CAMACARI II TRR1 BA | RB | FT TR 230/13,8 kV CAMACARI II TRR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/27/2021 | 10/26/2045 | R$8,532.78 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | TR 230/13,8 kV CAMACARI II TR7 BA | RB | FT CS 150/-105 MVAr CAMACARI II CS1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$711,288.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | TR 230/13,8 kV CAMACARI II TR7 BA | RB | FT CS 150/-105 MVAr CAMACARI II CS1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,995,996.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | TR 230/13,8 kV CAMACARI II TR7 BA | RB | FT CS 150/-105 MVAr CAMACARI II CS1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,840,065.05 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | RTL 500 kV 60 Mvar CAMACARI II RTR2 BA | RB | FT RTL 500 kV 60 Mvar CAMACARI II RTR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,898.24 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | RTL 500 kV 60 Mvar CAMACARI II RTR2 BA | RB | FT RTL 500 kV 60 Mvar CAMACARI II RTR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$765,798.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | RTL 500 kV 60 Mvar CAMACARI II RTR2 BA | RB | FT RTL 500 kV 60 Mvar CAMACARI II RTR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$705,972.72 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | RTL 500 kV 33,3 Mvar CAMACARI II RTR1 BA | RB | FT RTL 500 kV 33,3 Mvar CAMACARI II RTR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$224,705.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | RTL 500 kV 33,3 Mvar CAMACARI II RTR1 BA | RB | FT RTL 500 kV 33,3 Mvar CAMACARI II RTR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$630,561.16 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | RTL 500 kV 33,3 Mvar CAMACARI II RTR1 BA | RB | FT RTL 500 kV 33,3 Mvar CAMACARI II RTR1 BA | 061/2001 | IPCA | RMELP | REA 11954/2022 | R$837,073.19 | 6/1/2025 | Prevista | T2022-081 | Obra de Substituição Completa - Substituição do reator reserva 05ER-1 da SE CMD.(RTL 500 kV 33,3 Mvar CAMACARI II RTR1 BA). | ||||
| AXIA Energia Nordeste | CAMACARI II | RTL 500 kV 100 Mvar CAMACARI II RT1 BA | RB | FT RTL 500 kV 100 Mvar CAMACARI II RT1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$674,361.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | RTL 500 kV 100 Mvar CAMACARI II RT1 BA | RB | FT RTL 500 kV 100 Mvar CAMACARI II RT1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,892,372.88 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | RTL 500 kV 100 Mvar CAMACARI II RT1 BA | RB | FT RTL 500 kV 100 Mvar CAMACARI II RT1 BA | 061/2001 | IPCA | RMELP | REA 11954/2022 | R$ 2,511,219.59 | 6/1/2025 | Prevista | T2022-080 | Obra de Substituição Completa - Substituição dos reatores 05E1 A/B da SE CMD.(RTL 500 kV 100 Mvar CAMACARI II RT1 BA). | 4T25 | |||
| AXIA Energia Nordeste | CAMACARI II | MG 500 kV CAMACARI II MG1 BA | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,150,164.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | MG 500 kV CAMACARI II MG1 BA | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/30/2013 | 9/29/2030 | R$4,375.13 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCOS DE BATERIAS -48Vcc. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MG 500 kV CAMACARI II MG1 BA | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 2/7/2014 | 2/6/2029 | R$207,281.47 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE AMPLIFICADORES ÓPTICOS EM FINAL DE VIDA ÚTIL Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MG 500 kV CAMACARI II MG1 BA | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,033,724.32 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | MG 500 kV CAMACARI II MG1 BA | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 5,562,356.62 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | MG 500 kV CAMACARI II MG1 BA | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 2/21/2016 | 2/20/2033 | R$37,901.31 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BATERIAS - 125Vcc * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MG 500 kV CAMACARI II MG1 BA | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBNI | REA 6137/2016 | 10/9/2023 | 10/8/2055 | R$150,915.09 | 6/1/2025 | Ativa | T2016-088 | Complementação do Módulo geral da SE Camaçari II com 2 módulos de infraestrutura de manobra. | ||
| AXIA Energia Nordeste | CAMACARI II | MG 500 kV CAMACARI II MG1 BA | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBNI | REA 12205/2022 | 12/9/2024 | 12/8/2055 | R$169,077.47 | 6/1/2025 | Ativa | T2022-099 | Módulo de Infraestrutura de Manobra para o pátio de 230 kV - BD5 para a instalação do Banco de capacitores de derivação (230 kV, 1 x 100 Mvar trifásico). | ||
| AXIA Energia Nordeste | CAMACARI II | MG 500 kV CAMACARI II MG1 BA | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/6/2019 | 7/26/2042 | R$ 1,149,655.13 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 69 kV TT 69/13,8 kV CAMACARI II TA2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAMACARI II | MC 69 kV TT 69/13,8 kV CAMACARI II TA1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAMACARI II | MC 69 kV TR 69/13,8 kV CAMACARI II TR8 BA | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$56,157.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | MC 69 kV TR 69/13,8 kV CAMACARI II TR8 BA | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2022 | 9/5/2050 | R$42,187.84 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 69 kV TR 69/13,8 kV CAMACARI II TR8 BA | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBNI | REA 2040/2009 | 9/4/2019 | 9/3/2052 | R$66,926.42 | 6/1/2025 | Ativa | Substituição do disjuntor 12D1. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 69 kV TR 230/69 kV CAMACARI II TR6 BA | RBF | FT TR 230/69 kV CAMACARI II TR6 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | MC 69 kV TR 230/69 kV CAMACARI II TR6 BA | RBF | FT TR 230/69 kV CAMACARI II TR6 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/2/2019 | 3/5/2048 | R$39,153.63 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 69 kV TR 230/69 kV CAMACARI II TR6 BA | RBF | FT TR 230/69 kV CAMACARI II TR6 BA | 061/2001 | IPCA | RBNI | REA 2040/2009 | 9/4/2019 | 9/3/2052 | R$66,926.42 | 6/1/2025 | Ativa | Substituição do disjuntor 12D1. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 69 kV TR 230/69 kV CAMACARI II TR5 BA | RBF | FT TR 230/69 kV CAMACARI II TR5 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | MC 69 kV TR 230/69 kV CAMACARI II TR5 BA | RBF | FT TR 230/69 kV CAMACARI II TR5 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/27/2022 | 10/1/2050 | R$42,271.02 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 500 kV TR 500/230 kV CAMACARI II TR4 BA | RB | FT TR 500/230 kV CAMACARI II TR4 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$414,502.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | MC 500 kV TR 500/230 kV CAMACARI II TR4 BA | RB | FT TR 500/230 kV CAMACARI II TR4 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 9/12/2015 | 9/14/2045 | R$15,811.90 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC SIEMENS AKOF 500 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 500 kV TR 500/230 kV CAMACARI II TR4 BA | RB | FT TR 500/230 kV CAMACARI II TR4 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 9/12/2015 | 9/14/2045 | R$15,811.90 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC SIEMENS AKOF 500 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 500 kV TR 500/230 kV CAMACARI II TR4 BA | RB | FT TR 500/230 kV CAMACARI II TR4 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/10/2021 | 5/19/2051 | R$444,647.31 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 500 kV TR 500/230 kV CAMACARI II TR3 BA | RB | FT TR 500/230 kV CAMACARI II TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$414,502.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | MC 500 kV TR 500/230 kV CAMACARI II TR3 BA | RB | FT TR 500/230 kV CAMACARI II TR3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/21/2021 | 9/6/2051 | R$702,504.52 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 500 kV TR 500/230 kV CAMACARI II TR2 BA | RB | FT TR 500/230 kV CAMACARI II TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$414,502.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | MC 500 kV TR 500/230 kV CAMACARI II TR2 BA | RB | FT TR 500/230 kV CAMACARI II TR2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/12/2021 | 2/10/2053 | R$885,979.57 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 500 kV TR 500/230 kV CAMACARI II TR1 BA | RB | FT TR 500/230 kV CAMACARI II TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$414,502.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | MC 500 kV TR 500/230 kV CAMACARI II TR1 BA | RB | FT TR 500/230 kV CAMACARI II TR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/10/2021 | 12/23/2052 | R$871,903.67 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 500 kV RTL 500 kV 100 Mvar CAMACARI II RT1 BA | RB | FT RTL 500 kV 100 Mvar CAMACARI II RT1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$355,057.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | MC 500 kV RTL 500 kV 100 Mvar CAMACARI II RT1 BA | RB | FT RTL 500 kV 100 Mvar CAMACARI II RT1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/11/2021 | 5/19/2053 | R$422,517.60 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 500/230 kV CAMACARI II TR4 BA | RB | FT TR 500/230 kV CAMACARI II TR4 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 500/230 kV CAMACARI II TR4 BA | RB | FT TR 500/230 kV CAMACARI II TR4 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$454,511.36 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 500/230 kV CAMACARI II TR4 BA | RB | FT TR 500/230 kV CAMACARI II TR4 BA | 061/2001 | IPCA | RBNI | REA 6137/2016 | 1/3/2021 | 1/6/2051 | R$64,135.60 | 6/1/2025 | Ativa | T2016-088 | Adequação do módulo de conexão 230 kV do transformador 500/230 kV TR4 com a substituição de três transformadores de corrente e implantação de proteção de barra adaptativa conjugada com falha de disjuntor. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 500/230 kV CAMACARI II TR4 BA | RB | FT TR 500/230 kV CAMACARI II TR4 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/11/2022 | 7/10/2046 | R$26,203.03 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 500/230 kV CAMACARI II TR3 BA | RB | FT TR 500/230 kV CAMACARI II TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$195,641.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 500/230 kV CAMACARI II TR3 BA | RB | FT TR 500/230 kV CAMACARI II TR3 BA | 061/2001 | IPCA | RBNI | REA 6137/2016 | 1/20/2021 | 3/1/2053 | R$476,410.58 | 6/1/2025 | Ativa | T2016-088 | Adequação do módulo de conexão 230 kV do transformador 500/230 kV TR3 com a substituição de dois disjuntores, seis transformadores de corrente e implantação de proteção de barra adaptativa conjugada com falha de disjuntor. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 500/230 kV CAMACARI II TR3 BA | RB | FT TR 500/230 kV CAMACARI II TR3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/1/2020 | 8/26/2048 | R$80,731.12 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 500/230 kV CAMACARI II TR2 BA | RB | FT TR 500/230 kV CAMACARI II TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$195,641.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 500/230 kV CAMACARI II TR2 BA | RB | FT TR 500/230 kV CAMACARI II TR2 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 2/22/2014 | 3/2/2045 | R$51,908.25 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS TC NISSIN 94T2-A FASES A/B/C Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 500/230 kV CAMACARI II TR2 BA | RB | FT TR 500/230 kV CAMACARI II TR2 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 2/23/2014 | 3/3/2045 | R$51,913.08 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS TC NISSIN 94T2-B FASES A/B/C Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 500/230 kV CAMACARI II TR2 BA | RB | FT TR 500/230 kV CAMACARI II TR2 BA | 061/2001 | IPCA | RBNI | REA 6137/2016 | 12/20/2020 | 11/30/2053 | R$347,241.54 | 6/1/2025 | Ativa | T2016-088 | Adequação do módulo de conexão 230 kV do transformador 500/230 kV TR2 com a substituição de dois disjuntores e implantação de proteção de barra adaptativa conjugada com falha de disjuntor. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 500/230 kV CAMACARI II TR2 BA | RB | FT TR 500/230 kV CAMACARI II TR2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/9/2021 | 8/4/2049 | R$83,040.32 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 500/230 kV CAMACARI II TR1 BA | RB | FT TR 500/230 kV CAMACARI II TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$195,641.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 500/230 kV CAMACARI II TR1 BA | RB | FT TR 500/230 kV CAMACARI II TR1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 6/8/2014 | 6/16/2045 | R$52,421.50 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS TC NISSIN 94T1-A FASES A/B/C Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 500/230 kV CAMACARI II TR1 BA | RB | FT TR 500/230 kV CAMACARI II TR1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 6/7/2014 | 6/15/2045 | R$52,416.65 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS TC NISSIN 94T1-B FASES A/B/C Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 500/230 kV CAMACARI II TR1 BA | RB | FT TR 500/230 kV CAMACARI II TR1 BA | 061/2001 | IPCA | RBNI | REA 6137/2016 | 12/20/2020 | 12/19/2053 | R$340,536.62 | 6/1/2025 | Ativa | T2016-088 | Adequação do módulo de conexão 230 kV do transformador 500/230 kV TR1 com a substituição de dois disjuntores e implantação de proteção de barra adaptativa conjugada com falha de disjuntor. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 500/230 kV CAMACARI II TR1 BA | RB | FT TR 500/230 kV CAMACARI II TR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/1/2021 | 8/26/2049 | R$83,188.85 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 230/69 kV CAMACARI II TR6 BA | RBF | FT TR 230/69 kV CAMACARI II TR6 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 230/69 kV CAMACARI II TR6 BA | RBF | FT TR 230/69 kV CAMACARI II TR6 BA | 061/2001 | IPCA | RBNI | REA 6137/2016 | 6/29/2020 | 7/2/2050 | R$63,200.65 | 6/1/2025 | Ativa | T2016-088 | Adequação do módulo de conexão 230 kV do transformador 230/69 kV TR6 com a substituição de três transformadores de corrente e implantação de proteção de barra adaptativa conjugada com falha de disjuntor. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 230/69 kV CAMACARI II TR6 BA | RBF | FT TR 230/69 kV CAMACARI II TR6 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/30/2018 | 6/20/2033 | R$330,276.80 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 230/69 kV CAMACARI II TR5 BA | RBF | FT TR 230/69 kV CAMACARI II TR5 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 230/69 kV CAMACARI II TR5 BA | RBF | FT TR 230/69 kV CAMACARI II TR5 BA | 061/2001 | IPCA | RBNI | REA 6137/2016 | 1/20/2021 | 1/23/2051 | R$64,220.49 | 6/1/2025 | Ativa | T2016-088 | Adequação do módulo de conexão 230 kV do transformador 230/69 kV TR5 com a substituição de três transformadores de corrente e implantação de proteção de barra adaptativa conjugada com falha de disjuntor. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 230/69 kV CAMACARI II TR5 BA | RBF | FT TR 230/69 kV CAMACARI II TR5 BA | 061/2001 | IPCA | RBNI | REA 2040/2009 | 2/20/2022 | 2/19/2055 | R$174,309.02 | 6/1/2025 | Ativa | Substituição do disjuntor 14T5 na SE Camaçari II * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 230/69 kV CAMACARI II TR5 BA | RBF | FT TR 230/69 kV CAMACARI II TR5 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/5/2017 | 3/8/2033 | R$319,949.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 230/13,8 kV CAMACARI II TR7 BA | RB | FT CS 150/-105 MVAr CAMACARI II CS1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 230/13,8 kV CAMACARI II TR7 BA | RB | FT CS 150/-105 MVAr CAMACARI II CS1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$454,511.36 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 230/13,8 kV CAMACARI II TR7 BA | RB | FT CS 150/-105 MVAr CAMACARI II CS1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/22/2022 | 8/5/2044 | R$821,741.91 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV TR 230/13,8 kV CAMACARI II TR7 BA | RB | FT CS 150/-105 MVAr CAMACARI II CS1 BA | 061/2001 | IPCA | RBNI | DSP 2023/2022 | 7/28/2022 | 7/30/2052 | R$44,657.79 | 6/1/2025 | Ativa | Substituição de 2 transformadores de corrente (medição e proteção) 94T7, fases B e C, na SE CAMAÇARI II Capacidade nominal de corrente (A): no mínimo 2000 A; Capacidade nominal de curto-circuito (kA): no mínimo 50 kA. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 230 kV BC 230 kV 100 Mvar CAMACARI II BC1 BA | RB | FT BC 230 kV 100 Mvar CAMACARI II BC1 BA | 061/2001 | IPCA | RBNI | REA 12205/2022 | 12/9/2024 | 12/8/2052 | R$ 1,856,551.41 | 6/1/2025 | Ativa | T2022-099 | Instalação do Módulo de Manobra Conexão de Capacitor Derivação (230kV - BD5) para a Instalação do 1º Capacitor em Derivação 230 kV, 1 x 100 Mvar trifásico. | ||
| AXIA Energia Nordeste | CAMACARI II | MC 13,8 kV TR 69/13,8 kV CAMACARI II TR8 BA MC2 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | MC 13,8 kV TR 69/13,8 kV CAMACARI II TR8 BA MC1 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | MC 13,8 kV TR 13,8/0,46 kV CAMACARI II TR2 BA | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | MC 13,8 kV TR 13,8/0,46 kV CAMACARI II TR1 BA | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | MC 13,8 kV CS 150/-105 Mvar CAMACARI II CS2 BA | RB | FT CS 150/-105 MVAr CAMACARI II CS1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$60,394.36 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | MC 13,8 kV CS 150/-105 Mvar CAMACARI II CS2 BA | RB | FT CS 150/-105 MVAr CAMACARI II CS1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/16/2022 | 11/26/2049 | R$565,661.06 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | MC 13,8 kV CS 150/-105 Mvar CAMACARI II CS1 BA | RB | FT CS 150/-105 MVAr CAMACARI II CS1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$60,394.36 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | MC 13,8 kV CS 150/-105 Mvar CAMACARI II CS1 BA | RB | FT CS 150/-105 MVAr CAMACARI II CS1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/18/2022 | 1/9/2050 | R$638,965.09 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | IB 69 kV MG 500 kV CAMACARI II MG1 BA IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAMACARI II | IB 69 kV MG 500 kV CAMACARI II MG1 BA IB1 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 9/4/2019 | 9/3/2052 | R$66,926.42 | 6/1/2025 | Ativa | Substituição do disjuntor 12D1. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | CAMACARI II | IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$439,875.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,234,365.24 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,137,933.94 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 11/13/2015 | 11/15/2045 | R$15,901.73 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC SIEMENS AKOF 500 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 11/17/2015 | 11/19/2045 | R$15,907.51 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC SIEMENS AKOF 500 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 11/13/2015 | 11/15/2045 | R$15,901.73 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC SIEMENS AKOF 500 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 11/17/2015 | 11/19/2045 | R$15,907.51 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC SIEMENS AKOF 500 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 11/13/2015 | 11/15/2045 | R$15,901.73 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC SIEMENS AKOF 500 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 11/13/2015 | 11/15/2045 | R$15,901.73 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC SIEMENS AKOF 500 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | IB 500 kV MG 500 kV CAMACARI II MG1 BA IB3 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$439,875.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | IB 500 kV MG 500 kV CAMACARI II MG1 BA IB3 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,234,365.24 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | IB 500 kV MG 500 kV CAMACARI II MG1 BA IB3 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,137,933.94 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | IB 500 kV MG 500 kV CAMACARI II MG1 BA IB3 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/15/2021 | 12/21/2052 | R$475,540.12 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | IB 500 kV MG 500 kV CAMACARI II MG1 BA IB2 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$439,875.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | IB 500 kV MG 500 kV CAMACARI II MG1 BA IB2 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/18/2021 | 6/27/2052 | R$571,458.58 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | IB 500 kV MG 500 kV CAMACARI II MG1 BA IB1 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$439,875.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | IB 500 kV MG 500 kV CAMACARI II MG1 BA IB1 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,234,365.24 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | IB 500 kV MG 500 kV CAMACARI II MG1 BA IB1 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/2/2021 | 11/7/2052 | R$542,766.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | IB 230 kV MG 500 kV CAMACARI II MG1 BA IB4 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBNI | REA 6137/2016 | 10/9/2023 | 10/8/2053 | R$ 1,018,776.13 | 6/1/2025 | Ativa | T2016-088 | Instalação, na Subestação Camaçari II, de um disjuntor seccionador da barra 2 em 230 kV | ||
| AXIA Energia Nordeste | CAMACARI II | IB 230 kV MG 500 kV CAMACARI II MG1 BA IB3 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBNI | REA 6137/2016 | 10/9/2023 | 10/8/2053 | R$ 1,018,776.13 | 6/1/2025 | Ativa | T2016-088 | Instalação, na Subestação Camaçari II, de um disjuntor seccionador da barra 1 em 230 kV | ||
| AXIA Energia Nordeste | CAMACARI II | IB 230 kV MG 500 kV CAMACARI II MG1 BA IB2 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,085.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | IB 230 kV MG 500 kV CAMACARI II MG1 BA IB2 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBNI | REA 6137/2016 | 10/9/2023 | 10/8/2046 | R$112,283.35 | 6/1/2025 | Ativa | T2016-088 | Adequação do módulo de interligação de barras IB3 com substituição de três transformadores de corrente e implantação de proteção de barra adaptativa conjugada com falha de disjuntor. | ||
| AXIA Energia Nordeste | CAMACARI II | IB 230 kV MG 500 kV CAMACARI II MG1 BA IB2 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBNI | REA 2040/2009 | 2/20/2022 | 2/19/2055 | R$174,301.50 | 6/1/2025 | Ativa | Substituição do disjuntor 14D2 na SE Camaçari II * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | IB 230 kV MG 500 kV CAMACARI II MG1 BA IB1 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,085.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | IB 230 kV MG 500 kV CAMACARI II MG1 BA IB1 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 2/9/2014 | 2/17/2045 | R$34,563.54 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS TC NISSIN 94D1 FASES A/C Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | IB 230 kV MG 500 kV CAMACARI II MG1 BA IB1 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 2/9/2014 | 2/17/2045 | R$17,281.77 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS TC NISSIN 94D1 FASES B Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | IB 230 kV MG 500 kV CAMACARI II MG1 BA IB1 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBNI | REA 6137/2016 | 10/9/2023 | 10/8/2046 | R$112,283.35 | 6/1/2025 | Ativa | T2016-088 | Adequação do módulo de interligação de barras IB2 com implantação de três transformadores de corrente e implantação de proteção de barra adaptativa conjugada com falha de disjuntor. | ||
| AXIA Energia Nordeste | CAMACARI II | IB 230 kV MG 500 kV CAMACARI II MG1 BA IB1 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBNI | REA 7761/2019 | 12/31/2019 | 12/30/2034 | R$50,633.08 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE SISTEMAS DE PROTEÇÃO E PAINÉIS ASSOCIADOS EM 01 VÃO CENTRAL DE TRANSFERÊNCIA COM PROTEÇÃO PRÓPRIA, 14D1. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | IB 230 kV MG 500 kV CAMACARI II MG1 BA IB1 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBNI | REA 7761/2019 | 8/30/2015 | 8/29/2043 | R$1,276.13 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE SISTEMAS DE PROTEÇÃO E PAINÉIS ASSOCIADOS EM 01 VÃO CENTRAL DE TRANSFERÊNCIA COM PROTEÇÃO PRÓPRIA, 14D1. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 69 kV CAMACARI II STA HELENA-02F2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 69 kV CAMACARI II STA HELENA-02F2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/21/2021 | 9/28/2048 | R$45,300.03 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 69 kV CAMACARI II STA HELENA-02F2 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 9/4/2019 | 9/3/2052 | R$66,926.42 | 6/1/2025 | Ativa | Substituição do disjuntor 12D1. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 69 kV CAMACARI II STA HELENA-02F1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 69 kV CAMACARI II STA HELENA-02F1 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 1/16/2016 | 1/18/2046 | R$1,150.02 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras.RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 69 kV CAMACARI II STA HELENA-02F1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/21/2021 | 9/28/2048 | R$45,300.03 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 69 kV CAMACARI II CTG CTU-02J6 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 69 kV CAMACARI II CTG CTU-02J6 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 69 kV CAMACARI II CTG CTU-02J6 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 1/16/2016 | 1/18/2046 | R$1,150.02 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 69 kV CAMACARI II CTG CTU-02J6 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/21/2022 | 4/20/2046 | R$8,086.42 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 500 kV CAMACARI II LT 500 kV OLINDINA /CAMACARI II C-2 BA | RB | FT LT 500 kV OLINDINA /CAMACARI II C-2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$469,641.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | EL 500 kV CAMACARI II LT 500 kV OLINDINA /CAMACARI II C-2 BA | RB | FT LT 500 kV OLINDINA /CAMACARI II C-2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/7/2021 | 11/21/2049 | R$778,828.75 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 500 kV CAMACARI II LT 500 kV OLINDINA /CAMACARI II C-1 BA | RB | FT LT 500 kV OLINDINA /CAMACARI II C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$469,641.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | EL 500 kV CAMACARI II LT 500 kV OLINDINA /CAMACARI II C-1 BA | RB | FT LT 500 kV OLINDINA /CAMACARI II C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/22/2021 | 1/16/2049 | R$699,001.07 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | RB | FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$469,641.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | RB | FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,317,894.34 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | RB | FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,214,937.56 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | RB | FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/23/2015 | 5/25/2045 | R$15,649.62 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC SIEMENS AKOF 500 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | RB | FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 10/11/2015 | 10/13/2045 | R$15,853.91 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC SIEMENS AKOF 500 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | RB | FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 10/11/2015 | 10/13/2045 | R$15,853.91 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC SIEMENS AKOF 500 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | RB | FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | 061/2001 | IPCA | RBNI | REA 7761/2019 | 6/10/2019 | 6/9/2034 | R$49,555.31 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE SISTEMAS DE PROTEÇÃO E PAINÉIS ASSOCIADOS EM 01 TERMINAL DE LINHA DE TRANSMISSÃO LT 05L6. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | RB | FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/19/2022 | 5/14/2051 | R$114,563.16 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II VAGO7 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II VAGO6 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II VAGO6 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II VAGO6 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$584,375.21 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II VAGO5 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II VAGO5 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/10/2021 | 11/13/2051 | R$38,550.39 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II VAGO4 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II VAGO3 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II VAGO2 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II VAGO1 | RB | FT MG 500 kV CAMACARI II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /US.CAMACARI C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /US.CAMACARI C-1 BA | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 2/20/2022 | 2/19/2055 | R$174,301.50 | 6/1/2025 | Ativa | Substituição do disjuntor 14V1 na SE Camaçari II * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /US.CAMACARI C-1 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/26/2021 | 4/19/2048 | R$26,372.03 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /PITUACU C-1 BA | RB | FT LT 230 kV CAMACARI II /PITUACU C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /PITUACU C-1 BA | RB | FT LT 230 kV CAMACARI II /PITUACU C-1 BA | 061/2001 | IPCA | RBNI | REA 6137/2016 | 6/26/2020 | 9/3/2050 | R$70,091.96 | 6/1/2025 | Ativa | T2016-088 | Adequação do módulo de entrada de linha 230 kV CAMACARI II /PITUACU C-2 com a substituição de três transformadores de corrente e implantação de proteção de barra adaptativa conjugada com falha de disjuntor. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /PITUACU C-1 BA | RB | FT LT 230 kV CAMACARI II /PITUACU C-1 BA | 061/2001 | IPCA | RBNI | REA 2040/2009 | 2/20/2022 | 2/19/2055 | R$174,384.27 | 6/1/2025 | Ativa | Substituição do disjuntor 14M9 na SE Camaçari II * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /PITUACU C-1 BA | RB | FT LT 230 kV CAMACARI II /PITUACU C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/12/2018 | 2/25/2036 | R$230,985.51 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /PITUACU C-1 BA | RB | FT LT 230 kV CAMACARI II /PITUACU C-1 BA | 061/2001 | IPCA | RBNI | REA 5861/2016 | 2/2/2014 | 2/1/2029 | R$7,535.68 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE SISTEMAS DE PROTEÇÃO E PAINÉIS ASSOCIADOS AO TERMINAL DE LINHA DE TRANSMISSÃO (LT-04C7). Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /MATATU C-1 BA | RB | FT LT 230 kV CAMACARI II /MATATU C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /MATATU C-1 BA | RB | FT LT 230 kV CAMACARI II /MATATU C-1 BA | 061/2001 | IPCA | RBNI | REA 2376/2010 | 7/25/2014 | 7/27/2044 | R$25,040.62 | 6/1/2025 | Ativa | Substituição dos TCs 94M7-A, 94M7-B e 94M7-C.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /MATATU C-1 BA | RB | FT LT 230 kV CAMACARI II /MATATU C-1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/10/2013 | 11/9/2041 | R$33,733.87 | 6/1/2025 | Ativa | Substituição do sistema de proteção da LT Camaçari II-Matatu 04M7 na SE Camaçari II, por proteção digital (retrofit).Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /MATATU C-1 BA | RB | FT LT 230 kV CAMACARI II /MATATU C-1 BA | 061/2001 | IPCA | RBNI | REA 2040/2009 | 2/20/2022 | 2/19/2055 | R$174,301.50 | 6/1/2025 | Ativa | Substituição do disjuntor 14M7 na SE Camaçari II * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /MATATU C-1 BA | RB | FT LT 230 kV CAMACARI II /MATATU C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/27/2020 | 6/14/2048 | R$101,795.27 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /MATATU C-1 BA | RB | FT LT 230 kV CAMACARI II /MATATU C-1 BA | 061/2001 | IPCA | RBNI | REA 5861/2016 | 2/2/2014 | 2/1/2029 | R$7,535.68 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE SISTEMAS DE PROTEÇÃO E PAINÉIS ASSOCIADOS AO TERMINAL DE LINHA DE TRANSMISSÃO (LT-04C7). Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 5/18/2014 | 5/17/2042 | R$34,405.95 | 6/1/2025 | Ativa | Substituição do sistema de proteção da LT Camaçari II-Governador Mangabeira 04C7 na SE Camaçari II, por proteção digital (retrofit) Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/24/2017 | 4/24/2033 | R$161,118.98 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RBNI | REA 5861/2016 | 2/2/2014 | 2/1/2029 | R$7,535.68 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE SISTEMAS DE PROTEÇÃO E PAINÉIS ASSOCIADOS AO TERMINAL DE LINHA DE TRANSMISSÃO (LT-04C7). Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-1 BA | RB | FT LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-1 BA | 061/2001 | IPCA | RBNI | REA 2891/2011 | 11/30/2015 | 6/1/2042 | R$81,414.54 | 6/1/2025 | Ativa | T2009-193 | Adequar a proteção da EL da LT 230 kV Gov. Mangabeira/Camaçari II - C2, devido a complementação da linha para a SE Governador Mangabeira *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-1 BA | RB | FT LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-1 BA | RB | FT LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-1 BA | 061/2001 | IPCA | RBNI | REA 7761/2019 | 12/31/2019 | 7/22/2038 | R$34,507.79 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE SISTEMAS DE PROTEÇÃO E PAINÉIS ASSOCIADOS EM 01 TERMINAL DE LINHA DE TRANSMISSÃO LT 04S1. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-1 BA | RB | FT LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/6/2020 | 6/25/2046 | R$63,511.24 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /COTEGIPE C-1 BA | RB | FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /COTEGIPE C-1 BA | RB | FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA | 061/2001 | IPCA | RBNI | REA 6258/2017 | 11/27/2020 | 1/22/2051 | R$244,209.36 | 6/1/2025 | Ativa | T2016-097 | Substituição de chaves para a Recapacitação da LT 230 kV Camaçari II - Cotegipe *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /COTEGIPE C-1 BA | RB | FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA | 061/2001 | IPCA | RBNI | REA 6137/2016 | 8/17/2020 | 11/24/2050 | R$74,102.45 | 6/1/2025 | Ativa | T2016-088 | Adequação do módulo de entrada de linha 230 kV CAMACARI II /COTEGIPE C-2 com a substituição de três transformadores de corrente e implantação de proteção de barra adaptativa conjugada com falha de disjuntor. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /COTEGIPE C-1 BA | RB | FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA | 061/2001 | IPCA | RBNI | REA 2040/2009 | 2/20/2022 | 2/19/2055 | R$131,334.13 | 6/1/2025 | Ativa | Substituição do disjuntor 14M5 na SE Camaçari II * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /COTEGIPE C-1 BA | RB | FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/21/2018 | 10/19/2035 | R$210,718.45 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /CARAIBAS C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /CARAIBAS C-1 BA | DIT | 061/2001 | IPCA | RCDM | REA 6137/2016 | 7/28/2020 | 11/4/2050 | R$74,012.50 | 6/1/2025 | Ativa | T2016-088 | Adequação do módulo de entrada de linha 230 kV CAMACARI II /CARAIBAS C-1 com a substituição de três transformadores de corrente e implantação de proteção de barra adaptativa conjugada com falha de disjuntor. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /CARAIBAS C-1 BA | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 2/20/2022 | 2/19/2055 | R$174,312.16 | 6/1/2025 | Ativa | Substituição do disjuntor 14C8 na SE Camaçari II * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /CARAIBAS C-1 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/21/2018 | 6/7/2035 | R$214,721.39 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-2 BA | DIT | 061/2001 | IPCA | RCDM | REA 6137/2016 | 8/7/2020 | 10/15/2050 | R$70,281.53 | 6/1/2025 | Ativa | T2016-088 | Adequação do módulo de entrada de linha 230 kV CAMACARI II /BRASKEM C-2 com a substituição de três transformadores de corrente e implantação de proteção de barra adaptativa conjugada com falha de disjuntor. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-2 BA | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 2/20/2022 | 2/19/2055 | R$174,383.39 | 6/1/2025 | Ativa | Substituição do disjuntor 14N2 na SE Camaçari II * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-2 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/3/2018 | 8/7/2036 | R$239,284.05 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$584,375.21 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-1 BA | DIT | 061/2001 | IPCA | RCDM | REA 6137/2016 | 6/30/2020 | 9/7/2050 | R$70,113.98 | 6/1/2025 | Ativa | T2016-088 | Adequação do módulo de entrada de linha 230 kV CAMACARI II /BRASKEM C-1 com a substituição de três transformadores de corrente e implantação de proteção de barra adaptativa conjugada com falha de disjuntor. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-1 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/27/2017 | 4/13/2033 | R$159,834.11 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-1 BA | DIT | 061/2001 | IPCA | RCDM | REA 5861/2016 | 2/2/2014 | 8/9/2033 | R$7,818.74 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE SISTEMAS DE PROTEÇÃO E PAINÉIS ASSOCIADOS AO TERMINAL DE LINHA DE TRANSMISSÃO (LT-04C7). Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRAS.C.SODA C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRAS.C.SODA C-1 BA | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 2/20/2022 | 2/19/2055 | R$174,363.05 | 6/1/2025 | Ativa | Substituição do disjuntor 14C9 na SE Camaçari II * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRAS.C.SODA C-1 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/25/2021 | 12/29/2047 | R$28,457.39 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | CAMACARI II | EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRAS.C.SODA C-1 BA | DIT | 061/2001 | IPCA | RCDM | REA 5861/2016 | 2/2/2014 | 2/1/2029 | R$7,535.68 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE SISTEMAS DE PROTEÇÃO E PAINÉIS ASSOCIADOS AO TERMINAL DE LINHA DE TRANSMISSÃO (LT-04C7). Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | CAMACARI II | CS 150/-105 Mvar CAMACARI II CS2 BA | RB | FT CS 150/-105 MVAr CAMACARI II CS1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,617,512.00 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | CS 150/-105 Mvar CAMACARI II CS2 BA | RB | FT CS 150/-105 MVAr CAMACARI II CS1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,539,011.97 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | CS 150/-105 Mvar CAMACARI II CS2 BA | RB | FT CS 150/-105 MVAr CAMACARI II CS1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2022 | 3/25/2050 | R$ 1,746,052.44 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | CS 150/-105 Mvar CAMACARI II CS1 BA | RB | FT CS 150/-105 MVAr CAMACARI II CS1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,617,512.00 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | CS 150/-105 Mvar CAMACARI II CS1 BA | RB | FT CS 150/-105 MVAr CAMACARI II CS1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,539,011.97 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI II | CS 150/-105 Mvar CAMACARI II CS1 BA | RB | FT CS 150/-105 MVAr CAMACARI II CS1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 12/17/2016 | 12/16/2041 | R$11,486.57 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TROCADORES DE CALOR DO SISTEMA DE RESFRIAMENTO DOS COMPENSADORES SÍNCRONOS DA SUB CAMAÇARI II. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | CS 150/-105 Mvar CAMACARI II CS1 BA | RB | FT CS 150/-105 MVAr CAMACARI II CS1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2022 | 3/10/2050 | R$ 1,740,704.46 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI II | BC 230 kV 100 Mvar CAMACARI II BC1 BA | RB | FT BC 230 kV 100 Mvar CAMACARI II BC1 BA | 061/2001 | IPCA | RBNI | REA 12205/2022 | 12/9/2024 | 12/8/2044 | R$415,514.62 | 6/1/2025 | Ativa | T2022-099 | Instalação do Banco de Capacitores Derivação (230 kV, 1 x 100 Mvar trifásico) na SE 500 kV Camaçari II. | ||
| AXIA Energia Nordeste | CAMACARI IV | TR 500/230 kV CAMACARI IV TRR1 BA | RB | FT TR 500/230 kV CAMACARI IV TRR1 BA | 007/2010 | IPCA | RBL | CC 007/2010 | 12/19/2012 | 7/12/2040 | R$ 1,489,184.63 | 6/1/2025 | Ativa | T2010-061 | Contrato de Concessão nº 007/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Nordeste | CAMACARI IV | TR 500/230 kV CAMACARI IV TR2 BA | RB | FT TR 500/230 kV CAMACARI IV TR2 BA | 007/2010 | IPCA | RBL | CC 007/2010 | 12/19/2012 | 7/12/2040 | R$ 4,467,556.22 | 6/1/2025 | Ativa | T2010-061 | Contrato de Concessão nº 007/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Nordeste | CAMACARI IV | TR 500/230 kV CAMACARI IV TR1 BA | RB | FT TR 500/230 kV CAMACARI IV TR1 BA | 007/2010 | IPCA | RBL | CC 007/2010 | 12/19/2012 | 7/12/2040 | R$ 4,467,556.22 | 6/1/2025 | Ativa | T2010-061 | Contrato de Concessão nº 007/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Nordeste | CAMACARI IV | RTL 500 kV 180 Mvar CAMACARI IV RT1 BA | RB | FT RTL 500 kV 180 Mvar CAMACARI IV RT1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$770,628.97 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI IV | RTL 500 kV 180 Mvar CAMACARI IV RT1 BA | RB | FT RTL 500 kV 180 Mvar CAMACARI IV RT1 BA | 061/2001 | IPCA | RBNI | REA 2376/2010 | 3/24/2014 | 6/8/2049 | R$69,213.22 | 6/1/2025 | Ativa | Remanejamento do banco de reatores monofásico de linha (3)x60 Mvar (550kV) e da conexão do reator conectado na LT 500 kV Camaçari II - Jardim (terminal SE Camaçari II) para a LT 500 kV Camaçari IV - Jardim (terminal SE Camaçari IV). Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI IV | RTL 500 kV 180 Mvar CAMACARI IV RT1 BA | RB | FT RTL 500 kV 180 Mvar CAMACARI IV RT1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,162,515.10 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI IV | RTL 500 kV 180 Mvar CAMACARI IV RT1 BA | RB | FT RTL 500 kV 180 Mvar CAMACARI IV RT1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,993,574.71 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI IV | RTL 500 kV 180 Mvar CAMACARI IV RT1 BA | RB | FT RTL 500 kV 180 Mvar CAMACARI IV RT1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/31/2014 | 1/10/2050 | R$5,352.89 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI IV | RTB 500 kV 150 Mvar CAMACARI IV RB1 BA | RB | FT RTB 500 kV 150 Mvar CAMACARI IV RB1 BA | 007/2010 | IPCA | RBNIA | REA 15151/2024 | R$ 1,952,730.37 | 6/1/2025 | Prevista | T2024-011 | Instalação do 1º Banco de Reatores de Barra de 3 x 50 Mvar Monofásico / 500 kV na SE Camaçari IV. Necessidade de compatibilidade e compartilhamento com fase a reserva existente do reator de linha da LT 500 kV Camaçari IV - Jardim C1. | ||||
| AXIA Energia Nordeste | CAMACARI IV | MG 500 kV CAMACARI IV MG1 BA | RB | FT MG 500 kV CAMACARI IV MG1 BA | 007/2010 | IPCA | RBL | CC 007/2010 | 12/19/2012 | 7/12/2040 | R$ 1,647,364.88 | 6/1/2025 | Ativa | T2010-061 | Contrato de Concessão nº 007/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Nordeste | CAMACARI IV | MG 500 kV CAMACARI IV MG1 BA | RB | FT MG 500 kV CAMACARI IV MG1 BA | 007/2010 | IPCA | RBNIA | REA 15151/2024 | R$551,253.67 | 6/1/2025 | Prevista | T2024-011 | Adequação do MIG de 500 kV associada à instalação do 1º Banco de Reatores de Barra de 3 x 50 Mvar Monofásico na SE Camaçari IV | ||||
| AXIA Energia Nordeste | CAMACARI IV | MC 500 kV TR 500/230 kV CAMACARI IV TR2 BA | RB | FT TR 500/230 kV CAMACARI IV TR2 BA | 007/2010 | IPCA | RBL | CC 007/2010 | 12/19/2012 | 7/12/2040 | R$901,533.51 | 6/1/2025 | Ativa | T2010-061 | Contrato de Concessão nº 007/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Nordeste | CAMACARI IV | MC 500 kV TR 500/230 kV CAMACARI IV TR1 BA | RB | FT TR 500/230 kV CAMACARI IV TR1 BA | 007/2010 | IPCA | RBL | CC 007/2010 | 12/19/2012 | 7/12/2040 | R$901,533.51 | 6/1/2025 | Ativa | T2010-061 | Contrato de Concessão nº 007/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Nordeste | CAMACARI IV | MC 500 kV RTL 500 kV 180 Mvar CAMACARI IV RT1 BA | RB | FT RTL 500 kV 180 Mvar CAMACARI IV RT1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$355,057.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI IV | MC 500 kV RTL 500 kV 180 Mvar CAMACARI IV RT1 BA | RB | FT RTL 500 kV 180 Mvar CAMACARI IV RT1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 3/20/2014 | 5/8/2045 | R$60,919.92 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC TIPO AKOF 500 DE FABRICAÇAO SIEMENS, 95E2 FASES A/B/C Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI IV | MC 500 kV RTL 500 kV 180 Mvar CAMACARI IV RT1 BA | RB | FT RTL 500 kV 180 Mvar CAMACARI IV RT1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$996,352.14 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI IV | MC 500 kV RTL 500 kV 180 Mvar CAMACARI IV RT1 BA | RB | FT RTL 500 kV 180 Mvar CAMACARI IV RT1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$918,514.94 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAMACARI IV | MC 500 kV RTL 500 kV 180 Mvar CAMACARI IV RT1 BA | RB | FT RTL 500 kV 180 Mvar CAMACARI IV RT1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/27/2021 | 6/26/2054 | R$245,589.42 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI IV | MC 500 kV RTB 500 kV 150 Mvar CAMACARI IV RB1 BA | RB | FT RTB 500 kV 150 Mvar CAMACARI IV RB1 BA | 007/2010 | IPCA | RBNIA | REA 15151/2024 | R$ 1,652,773.32 | 6/1/2025 | Prevista | T2024-011 | Conexão de Reator de Barra de 500 kV, arranjo DJM, do 1º Banco de Reatores de Barra de 3 x 50 Mvar Monofásico na SE Camaçari IV | ||||
| AXIA Energia Nordeste | CAMACARI IV | MC 230 kV TR 500/230 kV CAMACARI IV TR2 BA | RB | FT TR 500/230 kV CAMACARI IV TR2 BA | 007/2010 | IPCA | RBL | CC 007/2010 | 12/19/2012 | 7/12/2040 | R$466,436.51 | 6/1/2025 | Ativa | T2010-061 | Contrato de Concessão nº 007/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Nordeste | CAMACARI IV | MC 230 kV TR 500/230 kV CAMACARI IV TR1 BA | RB | FT TR 500/230 kV CAMACARI IV TR1 BA | 007/2010 | IPCA | RBL | CC 007/2010 | 12/19/2012 | 7/12/2040 | R$466,436.51 | 6/1/2025 | Ativa | T2010-061 | Contrato de Concessão nº 007/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Nordeste | CAMACARI IV | IB 500 kV MG 500 kV CAMACARI IV MG1 BA IB4 | RB | FT MG 500 kV CAMACARI IV MG1 BA | 007/2010 | IPCA | RBNIA | REA 15151/2024 | R$ 1,895,591.20 | 6/1/2025 | Prevista | T2024-011 | Interligação de Barras 500 kV, arranjo DJM, devido à instalação do 1º Banco de Reatores de Barra de 3 x 50 Mvar Monofásico na SE Camaçari IV | ||||
| AXIA Energia Nordeste | CAMACARI IV | IB 500 kV MG 500 kV CAMACARI IV MG1 BA IB2 | RB | FT MG 500 kV CAMACARI IV MG1 BA | 007/2010 | IPCA | RBL | CC 007/2010 | 12/19/2012 | 7/12/2040 | R$897,265.90 | 6/1/2025 | Ativa | T2010-061 | Contrato de Concessão nº 007/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Nordeste | CAMACARI IV | IB 500 kV MG 500 kV CAMACARI IV MG1 BA IB1 | RB | FT MG 500 kV CAMACARI IV MG1 BA | 007/2010 | IPCA | RBL | CC 007/2010 | 12/19/2012 | 7/12/2040 | R$897,265.90 | 6/1/2025 | Ativa | T2010-061 | Contrato de Concessão nº 007/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Nordeste | CAMACARI IV | IB 230 kV MG 500 kV CAMACARI IV MG1 BA IB1 | RB | FT MG 500 kV CAMACARI IV MG1 BA | 007/2010 | IPCA | RBL | CC 007/2010 | 12/19/2012 | 7/12/2040 | R$342,500.19 | 6/1/2025 | Ativa | T2010-061 | Contrato de Concessão nº 007/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Nordeste | CAMACARI IV | EL 500 kV CAMACARI IV LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA | RB | FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA | 061/2001 | IPCA | RBNI | REA 10135/2021 | 8/15/2016 | 12/31/2042 | R$100,678.42 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 500 kV, arranjo disjuntor e meio, na subestação Camaçari IV, associada à linha de transmissão 500 kV Jardim – Camaçari IV. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI IV | EL 500 kV CAMACARI IV LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA | RB | FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2022 | 12/30/2037 | R$2,423.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI IV | EL 500 kV CAMACARI IV LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | RB | FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | 061/2001 | IPCA | RBNI | REA 10135/2021 | 8/15/2016 | 12/31/2042 | R$100,678.42 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 500 kV, arranjo disjuntor e meio, na subestação Camaçari IV, associada à linha de transmissão 500 kV Camaçari IV – Camaçari II. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI IV | EL 500 kV CAMACARI IV LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | RB | FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2022 | 12/30/2037 | R$2,423.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI IV | EL 230 kV CAMACARI IV LT 230 kV CATU /CAMACARI IV C-2 BA | RB | FT LT 230 kV CATU /CAMACARI IV C-2 BA | 061/2001 | IPCA | RBNI | REA 2891/2011 | 11/5/2014 | 12/15/2046 | R$ 1,068,992.73 | 6/1/2025 | Ativa | T2010-075 | Instalar um módulo de entrada de linha 230 kV, arranjo BD4, referente a LT 230 kV Camaçari IV/ Catu C2 *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CAMACARI IV | EL 230 kV CAMACARI IV LT 230 kV CATU /CAMACARI IV C-2 BA | RB | FT LT 230 kV CATU /CAMACARI IV C-2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2022 | 12/30/2037 | R$2,423.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI IV | EL 230 kV CAMACARI IV LT 230 kV CATU /CAMACARI IV C-1 BA | RB | FT LT 230 kV CATU /CAMACARI IV C-1 BA | 061/2001 | IPCA | RBNI | REA 2891/2011 | 10/13/2014 | 11/22/2046 | R$ 1,067,176.28 | 6/1/2025 | Ativa | T2010-075 | Instalar um módulo de entrada de linha 230 kV, arranjo BD4, referente a LT 230 kV Camaçari IV/ Catu C1 *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CAMACARI IV | EL 230 kV CAMACARI IV LT 230 kV CATU /CAMACARI IV C-1 BA | RB | FT LT 230 kV CATU /CAMACARI IV C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2022 | 12/30/2037 | R$2,423.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI IV | EL 230 kV CAMACARI IV LT 230 kV CAMACARI IV /PITUACU C-1 BA | RB | FT LT 230 kV CAMACARI IV /PITUACU C-1 BA | 061/2001 | IPCA | RBNI | REA 2891/2011 | 5/5/2014 | 6/14/2046 | R$ 1,054,461.18 | 6/1/2025 | Ativa | T2010-074 | Instalar um módulo de entrada de linha 230 kV, arranjo barra dupla a quatro chaves, referente à LT 230 kV Camaçari IV/ Pituaçu C1. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CAMACARI IV | EL 230 kV CAMACARI IV LT 230 kV CAMACARI IV /PITUACU C-1 BA | RB | FT LT 230 kV CAMACARI IV /PITUACU C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2022 | 12/30/2037 | R$2,423.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI IV | EL 230 kV CAMACARI IV LT 230 kV CAMACARI IV /JACARACANGA C-2 BA | RB | FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA | 061/2001 | IPCA | RBNI | REA 2891/2011 | 8/11/2014 | 9/20/2046 | R$ 1,062,200.80 | 6/1/2025 | Ativa | T2010-076 | Instalar um módulo de entrada de linha 230 kV, arranjo barra dupla a quatro chaves, referente à LT 230 kV Camaçari IV/ Jacaracanga C2. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CAMACARI IV | EL 230 kV CAMACARI IV LT 230 kV CAMACARI IV /JACARACANGA C-2 BA | RB | FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2022 | 12/30/2037 | R$2,423.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI IV | EL 230 kV CAMACARI IV LT 230 kV CAMACARI IV /JACARACANGA C-1 BA | RB | FT LT 230 kV CAMACARI IV /JACARACANGA C-1 BA | 061/2001 | IPCA | RBNI | REA 2891/2011 | 9/1/2014 | 10/11/2046 | R$ 1,063,859.29 | 6/1/2025 | Ativa | T2010-076 | Instalar um módulo de entrada de linha 230 kV, arranjo barra dupla a quatro chaves, referente à LT 230 kV Camaçari IV/ Jacaracanga C1. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CAMACARI IV | EL 230 kV CAMACARI IV LT 230 kV CAMACARI IV /JACARACANGA C-1 BA | RB | FT LT 230 kV CAMACARI IV /JACARACANGA C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2022 | 12/30/2037 | R$2,423.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMACARI IV | EL 230 kV CAMACARI IV LT 230 kV CAMACARI IV /COTEGIPE C-1 BA | RB | FT LT 230 kV CAMACARI IV /COTEGIPE C-1 BA | 061/2001 | IPCA | RBNI | REA 2891/2011 | 6/2/2014 | 7/12/2046 | R$ 1,056,672.50 | 6/1/2025 | Ativa | T2010-038 | Instalar um módulo de entrada de linha 230 kV, arranjo barra dupla a quatro chaves, referente à LT 230 kV Camaçari IV/ Cotegipe C1. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | CAMAQUA 3 | TR 230/69 kV CAMAQUA 3 TR2 RS | RBF | FT TR 230/69 kV CAMAQUA 3 TR2 RS | 004/2012 | IPCA | RBL | CC 004/2012 | 12/9/2014 | 5/10/2042 | R$974,423.27 | 6/1/2025 | Ativa | T2012-074-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Sul | CAMAQUA 3 | TR 230/69 kV CAMAQUA 3 TR1 RS | RBF | FT TR 230/69 kV CAMAQUA 3 TR1 RS | 004/2012 | IPCA | RBL | CC 004/2012 | 12/9/2014 | 5/10/2042 | R$974,423.27 | 6/1/2025 | Ativa | T2012-074-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Sul | CAMAQUA 3 | MG 230 kV CAMAQUA 3 MG1 RS | RB | FT MG 230 kV CAMAQUA 3 MG1 RS | 004/2012 | IPCA | RBL | CC 004/2012 | 12/9/2014 | 5/10/2042 | R$929,683.00 | 6/1/2025 | Ativa | T2012-074-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Sul | CAMAQUA 3 | MG 230 kV CAMAQUA 3 MG1 RS | RB | FT MG 230 kV CAMAQUA 3 MG1 RS | 004/2012 | IPCA | RBNI | DSP 1430/2021 | 5/27/2021 | 5/26/2036 | R$4,316.58 | 6/1/2025 | Ativa | Implantação do SEP para corte de geração nas UEE Aura Mangueira, Aura Mirim e Chuí na contingência da LT 525 kV Nova Santa Rita - Povo Novo. Lógica 5 atua quando fluxo na LT 230kV Camaquã 3 - Guaíba 2 for maior que 856A. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 | |||
| AXIA Energia Sul | CAMAQUA 3 | MC 69 kV TR 230/69 kV CAMAQUA 3 TR2 RS | RBF | FT TR 230/69 kV CAMAQUA 3 TR2 RS | 004/2012 | IPCA | RBL | CC 004/2012 | 12/9/2014 | 5/10/2042 | R$168,650.65 | 6/1/2025 | Ativa | T2012-074-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Sul | CAMAQUA 3 | MC 69 kV TR 230/69 kV CAMAQUA 3 TR1 RS | RBF | FT TR 230/69 kV CAMAQUA 3 TR1 RS | 004/2012 | IPCA | RBL | CC 004/2012 | 12/9/2014 | 5/10/2042 | R$168,650.65 | 6/1/2025 | Ativa | T2012-074-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Sul | CAMAQUA 3 | MC 230 kV TR 230/69 kV CAMAQUA 3 TR2 RS | RBF | FT TR 230/69 kV CAMAQUA 3 TR2 RS | 004/2012 | IPCA | RBL | CC 004/2012 | 12/9/2014 | 5/10/2042 | R$413,703.51 | 6/1/2025 | Ativa | T2012-074-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Sul | CAMAQUA 3 | MC 230 kV TR 230/69 kV CAMAQUA 3 TR1 RS | RBF | FT TR 230/69 kV CAMAQUA 3 TR1 RS | 004/2012 | IPCA | RBL | CC 004/2012 | 12/9/2014 | 5/10/2042 | R$413,703.51 | 6/1/2025 | Ativa | T2012-074-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Sul | CAMAQUA 3 | IB 69 kV MG 230 kV CAMAQUA 3 MG1 RS IB1 | DIT | 004/2012 | IPCA | RPEC | CC 004/2012 | 12/9/2014 | 5/10/2042 | R$170,222.64 | 6/1/2025 | Ativa | T2012-074-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Sul | CAMAQUA 3 | IB 230 kV MG 230 kV CAMAQUA 3 MG1 RS IB1 | RB | FT MG 230 kV CAMAQUA 3 MG1 RS | 004/2012 | IPCA | RBL | CC 004/2012 | 12/9/2014 | 5/10/2042 | R$359,462.83 | 6/1/2025 | Ativa | T2012-074-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Sul | CAMAQUA 3 | EL 69 kV CAMAQUA 3 DIST3 | DIT | 004/2012 | IPCA | RPEC | CC 004/2012 | 12/9/2014 | 5/10/2042 | R$294,088.48 | 6/1/2025 | Ativa | T2012-074-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Sul | CAMAQUA 3 | EL 69 kV CAMAQUA 3 DIST2 | DIT | 004/2012 | IPCA | RPEC | CC 004/2012 | 12/9/2014 | 5/10/2042 | R$294,088.48 | 6/1/2025 | Ativa | T2012-074-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Sul | CAMAQUA 3 | EL 69 kV CAMAQUA 3 DIST1 | DIT | 004/2012 | IPCA | RPEC | CC 004/2012 | 12/9/2014 | 5/10/2042 | R$294,088.48 | 6/1/2025 | Ativa | T2012-074-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Sul | CAMAQUA 3 | EL 230 kV CAMAQUA 3 LT 230 kV CAMAQUA 3 /POVO NOVO C-1 RS | RB | FT LT 230 kV CAMAQUA 3 /POVO NOVO C-1 RS | 004/2012 | IPCA | RBL | CC 004/2012 | 12/9/2014 | 5/10/2042 | R$582,647.23 | 6/1/2025 | Ativa | T2012-074-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Sul | CAMAQUA 3 | EL 230 kV CAMAQUA 3 LT 230 kV CAMAQUA 3 /NOVA STA RITA C-1 RS | RB | FT LT 230 kV CAMAQUA 3 /NOVA STA RITA C-1 RS | 004/2012 | IPCA | RBL | CC 004/2012 | 12/9/2014 | 5/10/2042 | R$582,647.23 | 6/1/2025 | Ativa | T2012-074-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia | CAMPINAS | TT 13,8/0,12 kV CAMPINAS TR54 SP | RB | FT TR 500/345 kV CAMPINAS TR54 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | TT 13,8/0,12 kV CAMPINAS TR51 SP | RB | FT TR 500/345 kV CAMPINAS TR51 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | TT 13,8/0,12 kV CAMPINAS TR5 SP | RBF | FT TR 345/138 kV CAMPINAS TR5 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | TT 13,8/0,12 kV CAMPINAS TR4 SP | RBF | FT TR 345/138 kV CAMPINAS TR4 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | TT 13,8/0,12 kV CAMPINAS TR3 SP | RBF | FT TR 345/138 kV CAMPINAS TR3 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | TT 13,8/0,12 kV CAMPINAS TR2 SP | RBF | FT TR 345/138 kV CAMPINAS TR2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | TT 13,8/0,12 kV CAMPINAS TR1 SP | RBF | FT TR 345/138 kV CAMPINAS TR1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | TR 500/345 kV CAMPINAS TRR1 SP | RB | FT TR 500/345 kV CAMPINAS TRR1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$609,828.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | TR 500/345 kV CAMPINAS TRR1 SP | RB | FT TR 500/345 kV CAMPINAS TRR1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/19/2017 | 11/26/2046 | R$9,925.30 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | CAMPINAS | TR 500/345 kV CAMPINAS TR54 SP | RB | FT TR 500/345 kV CAMPINAS TR54 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,828,419.99 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | TR 500/345 kV CAMPINAS TR51 SP | RB | FT TR 500/345 kV CAMPINAS TR51 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,828,419.99 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | TR 500/345 kV CAMPINAS TR51 SP | RB | FT TR 500/345 kV CAMPINAS TR51 SP | 062/2001 | IPCA | RMELP | REA 11449/2022 | R$ 9,481,429.65 | 6/1/2025 | Prevista | T2022-013 | Obra de Substituição Completa - Substituir na SE Campinas o transformador monofásico - TR51 - 500/345 kV - 3x186,66 MVA por outro de 3x186,66 MVA. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia | CAMPINAS | TR 345/138 kV CAMPINAS TRR1 SP | RBF | FT TR 345/138 kV CAMPINAS TRR1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$237,717.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | TR 345/138 kV CAMPINAS TRR1 SP | RBF | FT TR 345/138 kV CAMPINAS TRR1 SP | 062/2001 | IPCA | RBNI | REA 8707/2020 | 7/27/2021 | 7/4/2056 | R$ 1,194,873.72 | 6/1/2025 | Ativa | T2019-020 | Adequação para aumento de vida útil no Módulo de Equipamento – Unidade Monofásica do Autotransformadores Reserva 345/138 kV, 50 MVA, com a substituição total dos enrolamentos, isolamentos, buchas e comutador de tensão sob carga, também estão inclusos os serviços de desmontagem, transporte, montagem, ensaios e comissionamento na Subestação Campinas. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | CAMPINAS | TR 345/138 kV CAMPINAS TRR1 SP | RBF | FT TR 345/138 kV CAMPINAS TRR1 SP | 062/2001 | IPCA | RBNIA | DSP 1384/2024 | R$ 1,817,429.46 | 6/1/2025 | Prevista | T2024-123 | Obra de Substituição Completa - Substituição do autotransformador reserva TRR1, 345/138 kV, de 50 MVA para 100 MVA, na SE Campinas. | ||||
| AXIA Energia | CAMPINAS | TR 345/138 kV CAMPINAS TR5 SP | RBF | FT TR 345/138 kV CAMPINAS TR5 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$713,153.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | TR 345/138 kV CAMPINAS TR4 SP | RBF | FT TR 345/138 kV CAMPINAS TR4 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$713,153.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | TR 345/138 kV CAMPINAS TR4 SP | RBF | FT TR 345/138 kV CAMPINAS TR4 SP | 062/2001 | IPCA | RBNIA | DSP 1384/2024 | R$ 5,452,288.36 | 6/1/2025 | Prevista | T2024-135 | Obra de Substituição Completa - Substituição do banco de autotransformadores TR4, 345/138 kV, de 3 x 50 MVA para 3 x 100 MVA, na SE Campinas. | ||||
| AXIA Energia | CAMPINAS | TR 345/138 kV CAMPINAS TR3 SP | RBF | FT TR 345/138 kV CAMPINAS TR3 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$713,153.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | TR 345/138 kV CAMPINAS TR3 SP | RBF | FT TR 345/138 kV CAMPINAS TR3 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,736,638.71 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | TR 345/138 kV CAMPINAS TR3 SP | RBF | FT TR 345/138 kV CAMPINAS TR3 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,933,823.20 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | TR 345/138 kV CAMPINAS TR3 SP | RBF | FT TR 345/138 kV CAMPINAS TR3 SP | 062/2001 | IPCA | RBNIA | DSP 1384/2024 | R$ 5,452,288.36 | 6/1/2025 | Prevista | T2024-134 | Obra de Substituição Completa - Substituição do banco de autotransformadores TR2, 345/138 kV, de 3 x 50 MVA para 3 x 100 MVA, na SE Campinas. | ||||
| AXIA Energia | CAMPINAS | TR 345/138 kV CAMPINAS TR2 SP | RBF | FT TR 345/138 kV CAMPINAS TR2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$713,153.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | TR 345/138 kV CAMPINAS TR2 SP | RBF | FT TR 345/138 kV CAMPINAS TR2 SP | 062/2001 | IPCA | RBNIA | DSP 1384/2024 | R$ 5,452,288.36 | 6/1/2025 | Prevista | T2024-133 | Obra de Substituição Completa - Substituição do banco de autotransformadores TR2, 345/138 kV, de 3 x 50 MVA para 3 x 100 MVA, na SE Campinas. | ||||
| AXIA Energia | CAMPINAS | TR 345/138 kV CAMPINAS TR1 SP | RBF | FT TR 345/138 kV CAMPINAS TR1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$713,153.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | TR 345/138 kV CAMPINAS TR1 SP | RBF | FT TR 345/138 kV CAMPINAS TR1 SP | 062/2001 | IPCA | RBNIA | DSP 1384/2024 | R$ 5,452,288.36 | 6/1/2025 | Prevista | T2024-122 | Obra de Substituição Completa - Substituição do banco de autotransformadores TR1, 345/138 kV, de 3 x 50 MVA para 3 x 100 MVA, na SE Campinas. | ||||
| AXIA Energia | CAMPINAS | RTB 500 kV 45,33 Mvar CAMPINAS RTR2 SP | RB | FT RTB 500 kV 45,33 Mvar CAMPINAS RTR2 SP | 062/2001 | IPCA | RBNIA | REA 10860/2021 | R$660,087.22 | 6/1/2025 | Prevista | T2021-053 | Instalar, na SE CAMPINAS, um reator de barra monofásico reserva RTR2 500 kV - 45,33 Mvar. | ||||
| AXIA Energia | CAMPINAS | RTB 500 kV 45,3 Mvar CAMPINAS RTR1 SP | RB | FT RTB 500 kV 45,3 MVAr CAMPINAS RTR1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$238,500.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | RTB 500 kV 136 Mvar CAMPINAS RT3 SP | RB | FT RTB 500 kV 136 Mvar CAMPINAS RT3 SP | 062/2001 | IPCA | RBNIA | REA 10860/2021 | R$ 1,980,261.67 | 6/1/2025 | Prevista | T2021-053 | Instalar, na SE CAMPINAS, um banco de reatores de barra monofásicos RT3 500 kV - 136 Mvar. | ||||
| AXIA Energia | CAMPINAS | RTB 500 kV 112,5 Mvar CAMPINAS RT4 SP | RB | FT RTB 500 kV 112,5 Mvar CAMPINAS RT4 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$715,674.32 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | RTB 500 kV 112,5 Mvar CAMPINAS RT4 SP | RB | FT RTB 500 kV 112,5 Mvar CAMPINAS RT4 SP | 062/2001 | IPCA | RBNIA | REA 10860/2021 | R$ 3,234,515.07 | 6/1/2025 | Prevista | T2021-053 | Remanejamento do RTL 500 kV 112,5 Mvar CAMPINAS RTCH SP para a barra de 500kV da SE Campinas. | ||||
| AXIA Energia | CAMPINAS | RTB 13,8 kV 50 Mvar CAMPINAS RTR2 SP | RB | FT RTB 13,8 kV 50 Mvar CAMPINAS RTR2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$177,554.19 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | RTB 13,8 kV 50 Mvar CAMPINAS RT5 SP | RB | FT RTB 13,8 kV 50 MVAr CAMPINAS RT5 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$177,554.19 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | RTB 13,8 kV 50 Mvar CAMPINAS RT4 SP | RB | FT RTB 13,8 kV 50 MVAr CAMPINAS RT4 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$177,554.19 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | RTB 13,8 kV 50 Mvar CAMPINAS RT4 SP | RB | FT RTB 13,8 kV 50 MVAr CAMPINAS RT4 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$681,342.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | RTB 13,8 kV 25 Mvar CAMPINAS RT2 SP | RBF | FT RTB 13,8 kV 25 MVAr CAMPINAS RT2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$160,127.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | RTB 13,8 kV 25 Mvar CAMPINAS RT1 SP | RBF | FT RTB 13,8 kV 25 MVAr CAMPINAS RT1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$160,127.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MG 500 kV CAMPINAS MG1 SP | RB | FT MG 500 kV CAMPINAS MG1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,774,155.48 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MG 500 kV CAMPINAS MG1 SP | RB | FT MG 500 kV CAMPINAS MG1 SP | 062/2001 | IPCA | RBNI | REA 5012/2015 | 8/20/2018 | 6/8/2048 | R$ 1,053,625.61 | 6/1/2025 | Ativa | T2014-085 | Complementação do módulo geral da subestação Campinas com dois módulos de infraestrutura de manobra em 345 kV *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | CAMPINAS | MG 500 kV CAMPINAS MG1 SP | RB | FT MG 500 kV CAMPINAS MG1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,808,103.81 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MG 500 kV CAMPINAS MG1 SP | RB | FT MG 500 kV CAMPINAS MG1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 7,298,651.74 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MG 500 kV CAMPINAS MG1 SP | RB | FT MG 500 kV CAMPINAS MG1 SP | 062/2001 | IPCA | RBNI | REA 4347/2013 | 10/31/2017 | 10/30/2045 | R$11,283.98 | 6/1/2025 | Ativa | Substituição de RDP * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 – 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPINAS | MG 500 kV CAMPINAS MG1 SP | RB | FT MG 500 kV CAMPINAS MG1 SP | 062/2001 | IPCA | RBNI | REA 5484/2015 | 12/18/2018 | 11/10/2046 | R$257,475.71 | 6/1/2025 | Ativa | Substituição da proteção diferencial de barras da SE Campinas 345 kV para adaptativa. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPINAS | MG 500 kV CAMPINAS MG1 SP | RB | FT MG 500 kV CAMPINAS MG1 SP | 062/2001 | IPCA | RBNIA | REA 10860/2021 | R$600,409.03 | 6/1/2025 | Prevista | T2021-053 | Módulo de infraestrutura de manobra associado ao primeiro banco de reatores de barra em 500kV (3+1)x45,3 Mvar na SE Campinas. | ||||
| AXIA Energia | CAMPINAS | MG 500 kV CAMPINAS MG1 SP | RB | FT MG 500 kV CAMPINAS MG1 SP | 062/2001 | IPCA | RBNIA | REA 10860/2021 | R$600,409.03 | 6/1/2025 | Prevista | T2021-053 | Módulo de infraestrutura de manobra associado ao remanejamento do reator de linha de 112 Mvar para a barra da SE Campinas. | ||||
| AXIA Energia | CAMPINAS | MG 500 kV CAMPINAS MG1 SP | RB | FT MG 500 kV CAMPINAS MG1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 9/27/2020 | 7/29/2040 | R$707,200.58 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | CAMPINAS | MC 500 kV TR 500/345 kV CAMPINAS TR54 SP | RB | FT TR 500/345 kV CAMPINAS TR54 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MC 500 kV TR 500/345 kV CAMPINAS TR54 SP | RB | FT TR 500/345 kV CAMPINAS TR54 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/20/2019 | 3/24/2047 | R$84,435.95 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | CAMPINAS | MC 500 kV TR 500/345 kV CAMPINAS TR51 SP | RB | FT TR 500/345 kV CAMPINAS TR51 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MC 500 kV TR 500/345 kV CAMPINAS TR51 SP | RB | FT TR 500/345 kV CAMPINAS TR51 SP | 062/2001 | IPCA | RMEL | REN 643/2014 | 7/8/2015 | 4/1/2037 | R$39,121.41 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 3 para-raios PMI 2015-2018 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPINAS | MC 500 kV RTB 500 kV 136 Mvar CAMPINAS RT3 SP | RB | FT RTB 500 kV 136 Mvar CAMPINAS RT3 SP | 062/2001 | IPCA | RBNIA | REA 10860/2021 | R$ 1,517,387.61 | 6/1/2025 | Prevista | T2021-053 | Instalar, na SE CAMPINAS, um módulo de conexão com disjuntor, em 500kV,para o reator de barra RT3 500kV - 136 Mvar. | ||||
| AXIA Energia | CAMPINAS | MC 500 kV RTB 500 kV 112,5 Mvar CAMPINAS RT4 SP | RB | FT RTB 500 kV 112,5 Mvar CAMPINAS RT4 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,673.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MC 500 kV RTB 500 kV 112,5 Mvar CAMPINAS RT4 SP | RB | FT RTB 500 kV 112,5 Mvar CAMPINAS RT4 SP | 062/2001 | IPCA | RBNIA | REA 10860/2021 | R$ 1,517,387.61 | 6/1/2025 | Prevista | T2021-053 | Instalação do módulo de conexão do reator de barra RT4. | ||||
| AXIA Energia | CAMPINAS | MC 345 kV TR 500/345 kV CAMPINAS TR54 SP | RB | FT TR 500/345 kV CAMPINAS TR54 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MC 345 kV TR 500/345 kV CAMPINAS TR54 SP | RB | FT TR 500/345 kV CAMPINAS TR54 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/20/2016 | 3/19/2040 | R$16,184.00 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | CAMPINAS | MC 345 kV TR 500/345 kV CAMPINAS TR51 SP | RB | FT TR 500/345 kV CAMPINAS TR51 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MC 345 kV TR 500/345 kV CAMPINAS TR51 SP | RB | FT TR 500/345 kV CAMPINAS TR51 SP | 062/2001 | IPCA | RMEL | REN 643/2014 | 7/6/2015 | 3/28/2046 | R$214,796.78 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 1 disjuntor (DJ868 - CT AT51) PMI 2014-2017 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPINAS | MC 345 kV TR 500/345 kV CAMPINAS TR51 SP | RB | FT TR 500/345 kV CAMPINAS TR51 SP | 062/2001 | IPCA | RMEL | REN 643/2014 | 7/8/2015 | 4/1/2037 | R$27,591.37 | 6/1/2025 | Ativa | Substituição de 3 para-raios PMI 2015-2018 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPINAS | MC 345 kV TR 500/345 kV CAMPINAS TR51 SP | RB | FT TR 500/345 kV CAMPINAS TR51 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/31/2023 | 2/2/2053 | R$36,603.27 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | CAMPINAS | MC 345 kV TR 345/138 kV CAMPINAS TR5 SP | RBF | FT TR 345/138 kV CAMPINAS TR5 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MC 345 kV TR 345/138 kV CAMPINAS TR5 SP | RBF | FT TR 345/138 kV CAMPINAS TR5 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2018 | 12/31/2041 | R$16,651.44 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | CAMPINAS | MC 345 kV TR 345/138 kV CAMPINAS TR4 SP | RBF | FT TR 345/138 kV CAMPINAS TR4 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MC 345 kV TR 345/138 kV CAMPINAS TR3 SP | RBF | FT TR 345/138 kV CAMPINAS TR3 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MC 345 kV TR 345/138 kV CAMPINAS TR3 SP | RBF | FT TR 345/138 kV CAMPINAS TR3 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,046,877.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MC 345 kV TR 345/138 kV CAMPINAS TR3 SP | RBF | FT TR 345/138 kV CAMPINAS TR3 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/21/2016 | 3/20/2040 | R$41,725.64 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | CAMPINAS | MC 345 kV TR 345/138 kV CAMPINAS TR2 SP | RBF | FT TR 345/138 kV CAMPINAS TR2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MC 345 kV TR 345/138 kV CAMPINAS TR2 SP | RBF | FT TR 345/138 kV CAMPINAS TR2 SP | 062/2001 | IPCA | RMEL | REN 643/2014 | 8/7/2015 | 5/29/2046 | R$215,426.87 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 1 disjuntor (DJ828 - CT AT02) PMI 2014-2017 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPINAS | MC 345 kV TR 345/138 kV CAMPINAS TR2 SP | RBF | FT TR 345/138 kV CAMPINAS TR2 SP | 062/2001 | IPCA | RMEL | REN 643/2014 | 8/7/2015 | 5/31/2037 | R$27,700.63 | 6/1/2025 | Ativa | Substituição de 3 para-raios no vão do banco de autotransformadores AT02 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPINAS | MC 345 kV TR 345/138 kV CAMPINAS TR1 SP | RBF | FT TR 345/138 kV CAMPINAS TR1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MC 345 kV TR 345/138 kV CAMPINAS TR1 SP | RBF | FT TR 345/138 kV CAMPINAS TR1 SP | 062/2001 | IPCA | RMEL | REN 643/2014 | 9/14/2015 | 8/6/2046 | R$216,168.93 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 1 disjuntor (DJ818 - CT AT01) PMI 2014-2017 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPINAS | MC 345 kV TR 345/138 kV CAMPINAS TR1 SP | RBF | FT TR 345/138 kV CAMPINAS TR1 SP | 062/2001 | IPCA | RMEL | REN 643/2014 | 9/14/2015 | 8/8/2037 | R$27,837.20 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 3 para-raios. Melhoria incluída na análise do recurso do ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPINAS | MC 345 kV BC 345 kV 100 Mvar CAMPINAS BC2 SP | RB | FT BC 345 kV 100 Mvar CAMPINAS BC2 SP | 062/2001 | IPCA | RBNI | REA 5012/2015 | 8/20/2018 | 1/21/2050 | R$ 1,663,984.20 | 6/1/2025 | Ativa | T2014-085 | Instalar, na Subestação Campinas, um módulo de conexão de banco de capacitores em 345 kV, arranjo barra dupla a cinco chaves modificado. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | CAMPINAS | MC 345 kV BC 345 kV 100 Mvar CAMPINAS BC1 SP | RB | FT BC 345 kV 100 Mvar CAMPINAS BC1 SP | 062/2001 | IPCA | RBNI | REA 5012/2015 | 8/20/2018 | 1/21/2050 | R$ 1,664,299.29 | 6/1/2025 | Ativa | T2014-085 | Instalar, na Subestação Campinas, um módulo de conexão de banco de capacitores em 345 kV, arranjo barra dupla a cinco chaves modificado. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | CAMPINAS | MC 138 kV TR 345/138 kV CAMPINAS TR5 SP | RBF | FT TR 345/138 kV CAMPINAS TR5 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$98,227.49 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MC 138 kV TR 345/138 kV CAMPINAS TR4 SP | RBF | FT TR 345/138 kV CAMPINAS TR4 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$98,227.49 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MC 13,8 kV TT 13,8/0,12 kV CAMPINAS TR54 SP | RB | FT TR 500/345 kV CAMPINAS TR54 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MC 13,8 kV TT 13,8/0,12 kV CAMPINAS TR51 SP | RB | FT TR 500/345 kV CAMPINAS TR51 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MC 13,8 kV TT 13,8/0,12 kV CAMPINAS TR5 SP | RBF | FT TR 345/138 kV CAMPINAS TR5 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MC 13,8 kV TT 13,8/0,12 kV CAMPINAS TR4 SP | RBF | FT TR 345/138 kV CAMPINAS TR4 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MC 13,8 kV TT 13,8/0,12 kV CAMPINAS TR3 SP | RBF | FT TR 345/138 kV CAMPINAS TR3 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MC 13,8 kV TT 13,8/0,12 kV CAMPINAS TR2 SP | RBF | FT TR 345/138 kV CAMPINAS TR2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MC 13,8 kV TT 13,8/0,12 kV CAMPINAS TR1 SP | RBF | FT TR 345/138 kV CAMPINAS TR1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MC 13,8 kV RTB 13,8 kV 50 Mvar CAMPINAS RT5 SP | RB | FT RTB 13,8 kV 50 MVAr CAMPINAS RT5 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,744.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MC 13,8 kV RTB 13,8 kV 50 Mvar CAMPINAS RT4 SP | RB | FT RTB 13,8 kV 50 MVAr CAMPINAS RT4 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,744.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MC 13,8 kV RTB 13,8 kV 25 Mvar CAMPINAS RT2 SP | RBF | FT RTB 13,8 kV 25 MVAr CAMPINAS RT2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,744.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | MC 13,8 kV RTB 13,8 kV 25 Mvar CAMPINAS RT1 SP | RBF | FT RTB 13,8 kV 25 MVAr CAMPINAS RT1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,744.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | IB 500 kV MG 500 kV CAMPINAS MG1 SP IB3 | RB | FT MG 500 kV CAMPINAS MG1 SP | 062/2001 | IPCA | RBNIA | REA 10860/2021 | R$563,763.24 | 6/1/2025 | Prevista | T2021-053 | Expansão do barramento de 500 kV para manobra do RT 4 autorizado. | ||||
| AXIA Energia | CAMPINAS | IB 500 kV MG 500 kV CAMPINAS MG1 SP IB2 | RB | FT MG 500 kV CAMPINAS MG1 SP | 062/2001 | IPCA | RBNIA | REA 10860/2021 | R$492,863.85 | 6/1/2025 | Prevista | T2021-053 | Expansão do barramento de 500 kV com um disjuntor e equipamentos associados para manobra do RT 3 autorizado. | ||||
| AXIA Energia | CAMPINAS | IB 345 kV MG 500 kV CAMPINAS MG1 SP IB1 | RB | FT MG 500 kV CAMPINAS MG1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | IB 345 kV MG 500 kV CAMPINAS MG1 SP IB1 | RB | FT MG 500 kV CAMPINAS MG1 SP | 062/2001 | IPCA | RMEL | REN 643/2014 | 12/2/2014 | 12/23/2044 | R$186,885.64 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 1 disjuntor PMI 2014-2017 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPINAS | IB 345 kV MG 500 kV CAMPINAS MG1 SP IB1 | RB | FT MG 500 kV CAMPINAS MG1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/11/2015 | 9/13/2047 | R$71,427.25 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | CAMPINAS | EL 500 kV CAMPINAS LT 500 kV ITATIBA /CAMPINAS C-1 SP | RB | FT LT 500 kV ITATIBA /CAMPINAS C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | EL 500 kV CAMPINAS LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP | RB | FT LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | EL 500 kV CAMPINAS LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP | RB | FT LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP | 062/2001 | IPCA | RMEL | REN 643/2014 | 5/9/2014 | 12/3/2030 | R$60,989.20 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de duas caixas de sintonia e de duas bobinas de bloqueio para Cachoeira Paulista PMI 2014-2017 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPINAS | EL 500 kV CAMPINAS LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP | RB | FT LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP | 062/2001 | IPCA | RMEL | REN 643/2014 | 11/17/2015 | 12/10/2037 | R$39,793.45 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 3 para-raios PMI 2015-2018 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPINAS | EL 500 kV CAMPINAS LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP | RB | FT LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 4/13/2015 | 10/20/2040 | R$247,551.40 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | CAMPINAS | EL 500 kV CAMPINAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | RB | FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | EL 500 kV CAMPINAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | RB | FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | 062/2001 | IPCA | RMEL | REN 643/2014 | 10/25/2015 | 10/24/2037 | R$39,677.01 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 3 para-raios PMI 2015-2018 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPINAS | EL 500 kV CAMPINAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | RB | FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2020 | 12/30/2035 | R$ 235.79 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | CAMPINAS | EL 345 kV CAMPINAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG | RB | FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | EL 345 kV CAMPINAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG | RB | FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RBNI | REA 2040/2009 | 4/20/2013 | 8/5/2039 | R$371,787.07 | 6/1/2025 | Ativa | Substituição de Bobina de blolqueio (2), TC, disjuntor e chave seccionadora. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPINAS | EL 345 kV CAMPINAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG | RB | FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RMEL | REN 643/2014 | 6/1/2014 | 12/26/2030 | R$43,535.21 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de caixa de sintonia e de bobina de bloqueio (duas para Poços de Caldas)PMI 2014-2017 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPINAS | EL 345 kV CAMPINAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG | RB | FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RMEL | REN 643/2014 | 1/11/2016 | 4/5/2038 | R$28,259.64 | 6/1/2025 | Ativa | Substituição de 3 para-raios no vão da LT Campinas - Poços de Caldas * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPINAS | EL 345 kV CAMPINAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG | RB | FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/2/2014 | 12/15/2036 | R$133,906.85 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | CAMPINAS | EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP | RB | FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPINAS | EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP | RB | FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP | 062/2001 | IPCA | RBNI | REA 5484/2015 | 8/20/2018 | 10/1/2048 | R$102,625.77 | 6/1/2025 | Ativa | Substituição de 3 transformadores de corrente do vão Guarulhos (TC8048). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPINAS | EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP | RB | FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP | 062/2001 | IPCA | RBNI | REA 5484/2015 | 8/20/2018 | 8/22/2048 | R$54,689.91 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora do vão Guarulhos (SC8045). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPINAS | EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP | RB | FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP | 062/2001 | IPCA | RBNI | REA 5484/2015 | 8/20/2018 | 8/22/2048 | R$64,519.41 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora do vão Guarulhos (SC8047). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPINAS | EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP | RB | FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP | 062/2001 | IPCA | RBNI | REA 5484/2015 | 8/20/2018 | 8/22/2048 | R$54,689.91 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora do vão Guarulhos (SC8049). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPINAS | EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP | RB | FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP | 062/2001 | IPCA | RBNI | REA 5484/2015 | 8/20/2018 | 11/3/2048 | R$60,936.56 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora do vão Guarulhos (SC8041). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPINAS | EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP | RB | FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP | 062/2001 | IPCA | RBNI | REA 5484/2015 | 8/20/2018 | 8/22/2048 | R$54,689.91 | 6/1/2025 | Ativa | Substituição de 1 chave seccionadora do vão Guarulhos (SC8043). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPINAS | EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP | RB | FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP | 062/2001 | IPCA | RBNI | REA 5484/2015 | 8/20/2018 | 8/19/2038 | R$9,942.89 | 6/1/2025 | Ativa | Substituição de 2 bobina de bloqueio do vão Guarulhos (DJ8048) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPINAS | EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP | RB | FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/21/2014 | 10/4/2042 | R$400,519.63 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | CAMPINAS | EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-4 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$111,176.76 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | CAMPINAS | EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-4 SP | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/31/2015 | 8/2/2045 | R$44,346.85 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | CAMPINAS | EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-3 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$111,176.76 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | CAMPINAS | EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-3 SP | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$426,627.18 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | CAMPINAS | EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-3 SP | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/31/2015 | 8/2/2045 | R$44,346.85 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | CAMPINAS | EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-2 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$111,176.76 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | CAMPINAS | EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-2 SP | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 8/7/2015 | 5/31/2037 | R$3,874.74 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARA-RAIOS LADO 138 KV AT02 FASE A - Nº Oper: BANCO DE AUTOTRANSFORMADORES - PMI (003852/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | CAMPINAS | EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-2 SP | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 8/7/2015 | 5/31/2037 | R$3,874.74 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARA-RAIOS LADO 138 KV AT02 FASE B - Nº Oper: BANCO DE AUTOTRANSFORMADORES - PMI (003853/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | CAMPINAS | EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-2 SP | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 8/7/2015 | 5/31/2037 | R$3,874.74 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARA-RAIOS LADO 138 KV AT02 FASE C - Nº Oper: BANCO DE AUTOTRANSFORMADORES - PMI (003854/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | CAMPINAS | EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-1 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$111,176.76 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | CAMPINAS | EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-1 SP | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 9/14/2015 | 8/8/2037 | R$27,837.20 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 3 para-raios PMI 2015-2018 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | CAMPINAS | BC 345 kV 100 Mvar CAMPINAS BC2 SP | RB | FT BC 345 kV 100 Mvar CAMPINAS BC2 SP | 062/2001 | IPCA | RBNI | REA 5012/2015 | 8/20/2018 | 8/19/2038 | R$555,613.08 | 6/1/2025 | Ativa | T2014-085 | Instalação, na Subestação Campinas, de um banco de capacitores em 345 kV, de 100 Mvar. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | CAMPINAS | BC 345 kV 100 Mvar CAMPINAS BC1 SP | RB | FT BC 345 kV 100 Mvar CAMPINAS BC1 SP | 062/2001 | IPCA | RBNI | REA 5012/2015 | 8/20/2018 | 5/15/2040 | R$554,784.87 | 6/1/2025 | Ativa | T2014-085 | Instalar, na Subestação Campinas, um banco de capacitores em 345 kV. de 100 Mvar. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | CAMPINAS | BC 345 kV 100 Mvar CAMPINAS BC1 SP | RB | FT BC 345 kV 100 Mvar CAMPINAS BC1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/10/2016 | 3/9/2041 | R$4,469.87 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMPO FORMOSO | MG 230 kV CAMPO FORMOSO MG1 BA | RB | FT MG 230 kV CAMPO FORMOSO MG1 BA | 061/2001 | IPCA | RBNI | DSP 1172/2022 | 11/25/2015 | 12/31/2042 | R$31,786.84 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 3 Módulo de Infraestrutura de Manobra - MIM 230 kV na SE Campo Formoso, associados as entradas de linha 230kV para as SE´sSenhor do Bonfim II e Ourolândia II (anteriormente, para a SE Irecê), em função do seccionamento da Linha de Transmissão 230 kV Senhor do Bonfim II - Irecê. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMPO FORMOSO | MG 230 kV CAMPO FORMOSO MG1 BA | RB | FT MG 230 kV CAMPO FORMOSO MG1 BA | 061/2001 | IPCA | RBNI | DSP 1172/2022 | 11/25/2015 | 12/31/2042 | R$30,740.06 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 01 Módulo Geral - MG 230 kV na SE Campo Formoso, transferido para a Chesf após o seccionamento da Linha de Transmissão 230 kV Senhor do Bonfim II - Irecê. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMPO FORMOSO | MG 230 kV CAMPO FORMOSO MG1 BA | RB | FT MG 230 kV CAMPO FORMOSO MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/12/2022 | 6/27/2042 | R$123,540.46 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMPO FORMOSO | IB 230 kV MG 230 kV CAMPO FORMOSO MG1 BA IB1 | RB | FT MG 230 kV CAMPO FORMOSO MG1 BA | 061/2001 | IPCA | RBNI | DSP 1172/2022 | 11/25/2015 | 12/31/2042 | R$77,033.37 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de uma Interligação de Barras - IB 230 kV na SE Campo Formoso, transferido para a Chesf após o seccionamento da Linha de Transmissão 230 kV Senhor do Bonfim II - Irecê. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMPO FORMOSO | EL 230 kV CAMPO FORMOSO LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA | RB | FT LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA | 061/2001 | IPCA | RBNI | DSP 1172/2022 | 11/25/2015 | 12/31/2042 | R$107,243.26 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo Barra Dupla com Quatro Chaves, na Subestação Campo Formoso, associada à Linha de Transmissão 230 kV Senhor do Bonfim II – Campo Formoso. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMPO FORMOSO | EL 230 kV CAMPO FORMOSO LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA | RB | FT LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/2/2022 | 5/1/2037 | R$8,756.41 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAMPO FORMOSO | EL 230 kV CAMPO FORMOSO LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA | RB | FT LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA | 061/2001 | IPCA | RBNI | DSP 1172/2022 | 11/25/2015 | 12/31/2042 | R$107,243.26 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Campo Formoso, associada à Linha de Transmissão 230 kV Campo Formoso – Ourolândia II (anteriormente, a linha ia diretamente para a SE Irecê). *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAMPO FORMOSO | EL 230 kV CAMPO FORMOSO LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA | RB | FT LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/2/2022 | 5/1/2037 | R$5,837.61 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| Nova Era Integração | CAMPO FORMOSO II | RTL 500 kV 55 Mvar CAMPO FORMOSO II RTR2 BA | RB | FT RTL 500 kV 55 Mvar CAMPO FORMOSO II RTR2 BA | 008/2024 | IPCA | RBL | CC 008/2024 | R$635,513.41 | 6/1/2025 | Prevista | T2024-197-F | LT 500 kV Bom Nome II – Campo Formoso II C1 | ||||
| Nova Era Integração | CAMPO FORMOSO II | RTL 500 kV 165 Mvar CAMPO FORMOSO II RT4 BA | RB | FT LT 500 kV BOM NOME II /CAMPO FORMOSO II C-1 PE/BA | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,906,540.21 | 6/1/2025 | Prevista | T2024-197-F | LT 500 kV Bom Nome II – Campo Formoso II C1 | ||||
| Nova Era Integração | CAMPO FORMOSO II | MC 500 kV RTL 500 kV 165 Mvar CAMPO FORMOSO II RT4 BA | RB | FT LT 500 kV BOM NOME II /CAMPO FORMOSO II C-1 PE/BA | 008/2024 | IPCA | RBL | CC 008/2024 | R$366,483.72 | 6/1/2025 | Prevista | T2024-197-F | LT 500 kV Bom Nome II – Campo Formoso II C1 | ||||
| Nova Era Integração | CAMPO FORMOSO II | EL 500 kV CAMPO FORMOSO II LT 500 kV BOM NOME II /CAMPO FORMOSO II C-1 PE/BA | RB | FT LT 500 kV BOM NOME II /CAMPO FORMOSO II C-1 PE/BA | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,801,939.01 | 6/1/2025 | Prevista | T2024-197-F | LT 500 kV Bom Nome II – Campo Formoso II C1 | ||||
| AXIA Energia Sul | CAMPO GRANDE | MG 138 kV CAMPO GRANDE MG1 MS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$314,720.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAMPO GRANDE | MG 138 kV CAMPO GRANDE MG1 MS | DIT | 057/2001 | IPCA | RMEL | REN 643/2014 | 2/14/2013 | 2/13/2030 | R$17,193.48 | 6/1/2025 | Ativa | Substituição de 2 baterias 48 Vcc.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | CAMPO GRANDE | MG 138 kV CAMPO GRANDE MG1 MS | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 7/16/2020 | 12/14/2036 | R$62,611.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | CAMPO GRANDE | MG 138 kV CAMPO GRANDE MG1 MS | DIT | 057/2001 | IPCA | RCDM | DSP 1107/2021 | 10/1/2018 | 9/30/2035 | R$33,051.32 | 6/1/2025 | Ativa | BANCO DE BATERIAS 125 VCC Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | CAMPO GRANDE | MC 138 kV BC 138 kV 30 Mvar CAMPO GRANDE BC1 MS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$100,937.19 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAMPO GRANDE | MC 138 kV BC 138 kV 30 Mvar CAMPO GRANDE BC1 MS | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$177,153.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAMPO GRANDE | IB 138 kV MG 138 kV CAMPO GRANDE MG1 MS IB1 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,027.82 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAMPO GRANDE | EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,066.07 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAMPO GRANDE | EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS | DIT | 057/2001 | IPCA | RMEL | REN 643/2014 | 8/29/2013 | 8/28/2037 | R$10,666.11 | 6/1/2025 | Ativa | Substituição dos para-raios de 120kV das LIs CGM-MIM4.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | CAMPO GRANDE | EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 4/4/2020 | 10/10/2047 | R$20,443.88 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | CAMPO GRANDE | EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /U.MIMOSO C-1 MS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,066.07 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAMPO GRANDE | EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /U.MIMOSO C-1 MS | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 3/22/2020 | 12/8/2050 | R$160,605.24 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | CAMPO GRANDE | EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /SIDROLANDIA C-1 MS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,066.07 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAMPO GRANDE | EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /SIDROLANDIA C-1 MS | DIT | 057/2001 | IPCA | RMEL | REN 643/2014 | 12/9/2013 | 12/8/2037 | R$10,803.26 | 6/1/2025 | Ativa | Substituição dos para-raios de 120kV das LIs CGM-SIA.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | CAMPO GRANDE | EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /SIDROLANDIA C-1 MS | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$268,643.52 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAMPO GRANDE | EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /SIDROLANDIA C-1 MS | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 5/12/2020 | 5/15/2050 | R$16,998.02 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | CAMPO GRANDE | EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /MIMOSO 2 C-2 MS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,066.07 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAMPO GRANDE | EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /MIMOSO 2 C-2 MS | DIT | 057/2001 | IPCA | RMEL | REN 643/2014 | 8/29/2013 | 8/28/2037 | R$10,666.11 | 6/1/2025 | Ativa | Substituição dos para-raios de 120kV das LIs CGM-MIM3.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | CAMPO GRANDE | EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /MIMOSO 2 C-2 MS | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 5/15/2020 | 5/18/2050 | R$34,004.13 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | CAMPO GRANDE | EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /MIMOSO 2 C-1 MS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,066.07 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAMPO GRANDE | EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /MIMOSO 2 C-1 MS | DIT | 057/2001 | IPCA | RMEL | REN 643/2014 | 12/9/2013 | 12/8/2037 | R$10,803.26 | 6/1/2025 | Ativa | Substituição dos para-raios de 120kV das LIs CGM-MIM2.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | CAMPO GRANDE | EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /MIMOSO 2 C-1 MS | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 5/13/2022 | 5/15/2052 | R$39,058.75 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | CAMPO GRANDE | EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /CG M.COUTO C-2 MS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,066.07 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAMPO GRANDE | EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /CG M.COUTO C-2 MS | DIT | 057/2001 | IPCA | RMEL | REN 643/2014 | 12/9/2013 | 12/8/2037 | R$10,803.26 | 6/1/2025 | Ativa | Substituição dos para-raios de 120kV das LIs CGM-CGR 2.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | CAMPO GRANDE | EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /CG M.COUTO C-2 MS | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 5/24/2020 | 5/27/2050 | R$49,139.42 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | CAMPO GRANDE | EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /CG M.COUTO C-1 MS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,066.07 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAMPO GRANDE | EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /CG M.COUTO C-1 MS | DIT | 057/2001 | IPCA | RMEL | REN 643/2014 | 12/9/2013 | 12/8/2037 | R$10,803.26 | 6/1/2025 | Ativa | Substituição dos para-raios de 120kV das LIs CGM-CGR 1.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | CAMPO GRANDE | EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /CG M.COUTO C-1 MS | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 11/27/2021 | 1/19/2052 | R$20,293.77 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | CAMPO GRANDE | EL 138 kV CAMPO GRANDE LT 138 kV A.GUARIROBA /CAMPO GRANDE C-1 MS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,066.07 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAMPO GRANDE | EL 138 kV CAMPO GRANDE DIST1 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,066.07 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAMPO GRANDE | EL 138 kV CAMPO GRANDE DIST1 | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 6/4/2021 | 7/5/2051 | R$36,975.41 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | CAMPO GRANDE | BC 138 kV 30 Mvar CAMPO GRANDE BC1 MS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$123,530.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAMPO GRANDE | BC 138 kV 30 Mvar CAMPO GRANDE BC1 MS | DIT | 057/2001 | IPCA | RMELP | REA 13930/2023 | R$462,258.67 | 6/1/2025 | Prevista | T2023-028 | Obra de Substituição Completa - Substituição de Banco de Capacitores, BC1, 138 kV, 30 Mvar. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 1426/2022 | |||||
| AXIA Energia | CAMPOS | TT 13,8/0,12 kV CAMPOS TT2 RJ | RBF | FT TR 345/138 kV CAMPOS TR2 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | TR 345/15 kV CAMPOS TRCE1 RJ | RB | FT CE 100/-60 MvAr CAMPOS CE1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$307,323.90 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | TR 345/138 kV CAMPOS TRR2 RJ | RBF | FT TR 345/138 kV CAMPOS TRR2 RJ | 062/2001 | IPCA | RBNI | REA 4481/2013 | 11/9/2017 | 11/14/2052 | R$905,029.49 | 6/1/2025 | Ativa | T2013-094 | Instalação, na Subestação Campos, de uma unidade autotransformadora monofásica 345/138 kV, de 75 MVA, com finalidade de reserva. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | CAMPOS | TR 345/138 kV CAMPOS TRR1 RJ | RBF | FT TR 345/138 kV CAMPOS TRR1 RJ | 062/2001 | IPCA | RBNI | REA 4188/2013 | 5/26/2017 | 12/16/2051 | R$883,141.20 | 6/1/2025 | Ativa | T2013-038 | Instalação, na subestação Campos, de uma unidade autotransformadora monofásica 345/138 kV, de 75 MVA, reserva. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | CAMPOS | TR 345/138 kV CAMPOS TR4 RJ | RBF | FT TR 345/138 kV CAMPOS TR4 RJ | 062/2001 | IPCA | RBNI | REA 4481/2013 | 11/9/2017 | 2/3/2052 | R$ 2,948,143.32 | 6/1/2025 | Ativa | T2013-094 | Instalação, na SE Campos, de um banco de autotransformadores monofásicos 345/138 kV, 3 x 75 MVA. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | CAMPOS | TR 345/138 kV CAMPOS TR3 RJ | RBF | FT TR 345/138 kV CAMPOS TR3 RJ | 062/2001 | IPCA | RBNI | REA 6787/2017 | 10/2/2020 | 2/25/2055 | R$ 4,452,437.74 | 6/1/2025 | Ativa | T2017-071 | Obra de Substituição Completa - Substituição do TR3 (trifásico) pelo AT03 345/138 kV - 3x75 MVA (monofásico) na SE Campos. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | CAMPOS | TR 345/138 kV CAMPOS TR2 RJ | RBF | FT TR 345/138 kV CAMPOS TR2 RJ | 062/2001 | IPCA | RBNI | REA 6787/2017 | 11/5/2018 | 10/4/2053 | R$ 4,091,311.09 | 6/1/2025 | Ativa | T2017-070 | Obra de Substituição Completa - Substituição do TR2 (trifásico) pelo AT02 345/138 kV - 3x75 MVA (monofásico) na SE Campos. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | CAMPOS | TR 345/138 kV CAMPOS TR1 RJ | RBF | FT TR 345/138 kV CAMPOS TR1 RJ | 062/2001 | IPCA | RMEL | REA 7185/2018 | 8/8/2022 | 4/5/2057 | R$ 4,820,327.60 | 6/1/2025 | Ativa | T2018-024 | Obra de Substituição Completa - Substituição do banco de autotransformador AT01 345/138/13,8 kV, 3x75 MVA, por outro de mesma potência. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | CAMPOS | RTL 345 kV 60 Mvar CAMPOS RT6 RJ | RB | FT RTL 345 kV 60 MVAr CAMPOS RT6 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$473,185.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | RTL 345 kV 60 Mvar CAMPOS RT6 RJ | RB | FT RTL 345 kV 60 MVAr CAMPOS RT6 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,815,793.02 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | RTL 345 kV 60 Mvar CAMPOS RT5 RJ | RB | FT RTL 345 kV 60 MVAr CAMPOS RT5 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$473,185.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | RTL 345 kV 60 Mvar CAMPOS RT5 RJ | RB | FT RTL 345 kV 60 MVAr CAMPOS RT5 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,815,793.02 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | RTL 345 kV 60 Mvar CAMPOS RT5 RJ | RB | FT RTL 345 kV 60 MVAr CAMPOS RT5 RJ | 062/2001 | IPCA | RMEL | REA 11449/2022 | 4/29/2025 | 4/28/2060 | R$ 1,059,717.94 | 6/1/2025 | Ativa | T2022-008 | Obra de Substituição Parcial - Substituir na SE Campos a fase A e B do reator monofásico - RT5 - 345 kV - 2x20 MVAr por outra fase A e B de 2x20 MVAr. Parcela de RAP referente à troca da fase A e B do reator RT5. Não excluir a receita de O&M antiga até a entrada das três fases do equipamento. | ||
| AXIA Energia | CAMPOS | RTL 345 kV 20 Mvar CAMPOS RTR1 RJ | RB | FT RTL 345 kV 20 Mvar CAMPOS RTR1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$157,728.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | MG 345 kV CAMPOS MG1 RJ | RB | FT MG 345 kV CAMPOS MG1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,218,054.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | MG 345 kV CAMPOS MG1 RJ | RB | FT MG 345 kV CAMPOS MG1 RJ | 062/2001 | IPCA | RBNI | REA 4481/2013 | 11/9/2017 | 4/2/2048 | R$438,139.01 | 6/1/2025 | Ativa | T2013-094 | Complementação do módulo geral da Subestação Campos com um módulo de infraestrura de manobra em 345 kV e um módulo de infraestrutura de manobra em 138 kV, referentes à instalação do 4º banco de ATR 345/138 kV. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | CAMPOS | MG 345 kV CAMPOS MG1 RJ | RB | FT MG 345 kV CAMPOS MG1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,674,135.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | MG 345 kV CAMPOS MG1 RJ | RB | FT MG 345 kV CAMPOS MG1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 5,010,923.46 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | MG 345 kV CAMPOS MG1 RJ | RB | FT MG 345 kV CAMPOS MG1 RJ | 062/2001 | IPCA | RBNI | REA 6787/2017 | 11/5/2018 | 5/3/2049 | R$85,634.01 | 6/1/2025 | Ativa | T2017-070 | Complemento do Módulo Geral da SE Campos com um módulo de infraestrutura para substituição do T2 (trifásico) pelo AT02 3x75MVA(monofásico). *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | CAMPOS | MG 345 kV CAMPOS MG1 RJ | RB | FT MG 345 kV CAMPOS MG1 RJ | 062/2001 | IPCA | RBNI | REA 6787/2017 | 10/2/2020 | 3/31/2051 | R$84,767.13 | 6/1/2025 | Ativa | T2017-071 | Complemento do Módulo Geral da SE Campos com um módulo de infraestrutura para substituição do TR3 (trifásico) pelo AT03 3x75MVA(monofásico). *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | CAMPOS | MG 345 kV CAMPOS MG1 RJ | RB | FT MG 345 kV CAMPOS MG1 RJ | 062/2001 | IPCA | RBNIA | REA 6787/2017 | R$ 1,467,770.87 | 6/1/2025 | Prevista | T2017-073 | Complemento do módulo geral da SE Campos para adequação no pátio de 138 kV. | ||||
| AXIA Energia | CAMPOS | MG 345 kV CAMPOS MG1 RJ | RB | FT MG 345 kV CAMPOS MG1 RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/31/2017 | 3/27/2033 | R$3,006.44 | 6/1/2025 | Ativa | Substituição do Servidores e IHM do Sistema de Supervisão e Controle Local (SAGE) por obsolescência ou por atualização tecnológica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPOS | MG 345 kV CAMPOS MG1 RJ | RB | FT MG 345 kV CAMPOS MG1 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/21/2022 | 6/29/2046 | R$ 2,813,445.02 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | CAMPOS | MC 345 kV TR 345/15 kV CAMPOS TRCE1 RJ CE1 | RB | FT CE 100/-60 MvAr CAMPOS CE1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$261,892.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | MC 345 kV TR 345/138 kV CAMPOS TR4 RJ | RBF | FT TR 345/138 kV CAMPOS TR4 RJ | 062/2001 | IPCA | RBNI | REA 4481/2013 | 11/9/2017 | 12/27/2049 | R$ 1,381,126.07 | 6/1/2025 | Ativa | T2013-094 | Instalação, na subestação Campos, de um módulo de conexão de transformador em 345 kV, arranjo anel, com dois disjuntores. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | CAMPOS | MC 345 kV TR 345/138 kV CAMPOS TR3 RJ | RBF | FT TR 345/138 kV CAMPOS TR3 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,615.91 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | MC 345 kV TR 345/138 kV CAMPOS TR3 RJ | RBF | FT TR 345/138 kV CAMPOS TR3 RJ | 062/2001 | IPCA | RMEL | REN 643/2014 | 9/1/2015 | 6/23/2046 | R$184,554.81 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 1 disjuntor PMI 2014-2017 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPOS | MC 345 kV TR 345/138 kV CAMPOS TR3 RJ | RBF | FT TR 345/138 kV CAMPOS TR3 RJ | 062/2001 | IPCA | RMEL | REN 643/2014 | 10/20/2016 | 10/19/2039 | R$29,214.81 | 6/1/2025 | Ativa | Substituição de 3 Para-raio 345 kV(AT03) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPOS | MC 345 kV TR 345/138 kV CAMPOS TR3 RJ | RBF | FT TR 345/138 kV CAMPOS TR3 RJ | 062/2001 | IPCA | RBNI | REA 6787/2017 | 10/2/2020 | 1/29/2040 | R$298,415.86 | 6/1/2025 | Ativa | T2017-071 | Adequação na conexão em 345 kV devido à substituição do TR3 (trifásico) pelo AT03 345/138 kV - 3x75 MVA (monofásico) na SE Campos. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | CAMPOS | MC 345 kV TR 345/138 kV CAMPOS TR3 RJ | RBF | FT TR 345/138 kV CAMPOS TR3 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 9/1/2015 | 5/21/2048 | R$271,345.21 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | CAMPOS | MC 345 kV TR 345/138 kV CAMPOS TR2 RJ | RBF | FT TR 345/138 kV CAMPOS TR2 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,615.91 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | MC 345 kV TR 345/138 kV CAMPOS TR2 RJ | RBF | FT TR 345/138 kV CAMPOS TR2 RJ | 062/2001 | IPCA | RMEL | REN 643/2014 | 1/29/2015 | 4/19/2039 | R$40,676.00 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição 3 para-raios PMI 2015-2018 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPOS | MC 345 kV TR 345/138 kV CAMPOS TR2 RJ | RBF | FT TR 345/138 kV CAMPOS TR2 RJ | 062/2001 | IPCA | RBNI | REA 6787/2017 | 11/5/2018 | 7/31/2036 | R$320,606.23 | 6/1/2025 | Ativa | T2017-070 | Adequação na conexão em 345 kV devido à substituição do TR2 (trifásico) pelo AT02 345/138 kV - 3x75 MVA (monofásico) na SE Campos. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | CAMPOS | MC 345 kV TR 345/138 kV CAMPOS TR1 RJ | RBF | FT TR 345/138 kV CAMPOS TR1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,615.91 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | MC 345 kV TR 345/138 kV CAMPOS TR1 RJ | RBF | FT TR 345/138 kV CAMPOS TR1 RJ | 062/2001 | IPCA | RMEL | REN 643/2014 | 12/8/2015 | 1/29/2047 | R$186,186.86 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 1 disjuntor PMI 2014-2017 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPOS | MC 345 kV TR 345/138 kV CAMPOS TR1 RJ | RBF | FT TR 345/138 kV CAMPOS TR1 RJ | 062/2001 | IPCA | RMEL | REA 7185/2018 | 8/8/2022 | 10/23/2044 | R$158,433.47 | 6/1/2025 | Ativa | T2018-024 | Adequação do módulo de manobra – conexão de transformador 345 kV, devido a substituição do AT01. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | CAMPOS | MC 345 kV TR 345/138 kV CAMPOS TR1 RJ | RBF | FT TR 345/138 kV CAMPOS TR1 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 9/5/2015 | 6/15/2048 | R$251,376.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | CAMPOS | MC 345 kV RTL 345 kV 60 Mvar CAMPOS RT6 RJ | RB | FT RTL 345 kV 60 MVAr CAMPOS RT6 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,441.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | MC 345 kV RTL 345 kV 60 Mvar CAMPOS RT5 RJ | RB | FT RTL 345 kV 60 MVAr CAMPOS RT5 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,441.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | MC 345 kV BC 345 kV 60 Mvar CAMPOS BC9 RJ | RB | FT BC 345 kV 60 Mvar CAMPOS BC9 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$237,734.88 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | MC 345 kV BC 345 kV 60 Mvar CAMPOS BC10 RJ | RB | FT BC 345 kV 60 Mvar CAMPOS BC10 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$237,734.88 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | MC 138 kV TR 345/138 kV CAMPOS TR4 RJ | RBF | FT TR 345/138 kV CAMPOS TR4 RJ | 062/2001 | IPCA | RBNI | REA 4481/2013 | 11/9/2017 | 2/3/2054 | R$ 1,640,884.21 | 6/1/2025 | Ativa | T2013-094 | Instalação, na Subestação Campos, de um módulo de conexão de transformador em 138 kV, arranjo barra principal e transferência, e instalação de 2500 metros de cabo isolado para conexão ao setor de 138 kV da subestação, incluindo conexão da fase reserva. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | CAMPOS | MC 138 kV TR 345/138 kV CAMPOS TR4 RJ | RBF | FT TR 345/138 kV CAMPOS TR4 RJ | 062/2001 | IPCA | RBNI | REA 6787/2017 | 8/30/2024 | 8/29/2052 | R$785,344.16 | 6/1/2025 | Ativa | T2017-073 | Adequação do pátio de 138 kV da SE Campos de barra principal e transferência para barra dupla a quatro chaves. | ||
| AXIA Energia | CAMPOS | MC 138 kV TR 345/138 kV CAMPOS TR4 RJ | RBF | FT TR 345/138 kV CAMPOS TR4 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/21/2020 | 10/20/2044 | R$20,389.79 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | CAMPOS | MC 138 kV TR 345/138 kV CAMPOS TR3 RJ | RBF | FT TR 345/138 kV CAMPOS TR3 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$107,257.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | MC 138 kV TR 345/138 kV CAMPOS TR3 RJ | RBF | FT TR 345/138 kV CAMPOS TR3 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$411,587.18 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | MC 138 kV TR 345/138 kV CAMPOS TR3 RJ | RBF | FT TR 345/138 kV CAMPOS TR3 RJ | 062/2001 | IPCA | RBNI | REA 6787/2017 | 10/2/2020 | 1/29/2041 | R$72,812.89 | 6/1/2025 | Ativa | T2017-071 | Adequação na conexão em 138 kV devido à substituição do TR3 (trifásico) pelo AT03 345/138 kV - 3x75 MVA (monofásico) na SE Campos. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | CAMPOS | MC 138 kV TR 345/138 kV CAMPOS TR3 RJ | RBF | FT TR 345/138 kV CAMPOS TR3 RJ | 062/2001 | IPCA | RBNI | REA 6787/2017 | 8/30/2024 | 8/29/2052 | R$785,344.16 | 6/1/2025 | Ativa | T2017-073 | Adequação do pátio de 138 kV da SE Campos de barra principal e transferência para barra dupla a quatro chaves. | ||
| AXIA Energia | CAMPOS | MC 138 kV TR 345/138 kV CAMPOS TR3 RJ | RBF | FT TR 345/138 kV CAMPOS TR3 RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/3/2016 | 11/27/2039 | R$4,092.70 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR AT03 VÃO DE 138KV FASE A - Nº Oper: BANCO DE AUTOTRANSFORMADORES - PMI (004010/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPOS | MC 138 kV TR 345/138 kV CAMPOS TR3 RJ | RBF | FT TR 345/138 kV CAMPOS TR3 RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/3/2016 | 11/27/2039 | R$4,092.70 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR AT03 VÃO DE 138KV FASE B - Nº Oper: BANCO DE AUTOTRANSFORMADORES - PMI (004011/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPOS | MC 138 kV TR 345/138 kV CAMPOS TR3 RJ | RBF | FT TR 345/138 kV CAMPOS TR3 RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/3/2016 | 11/27/2039 | R$4,092.70 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR AT03 VÃO DE 138KV FASE C - Nº Oper: BANCO DE AUTOTRANSFORMADORES - PMI (004012/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPOS | MC 138 kV TR 345/138 kV CAMPOS TR3 RJ | RBF | FT TR 345/138 kV CAMPOS TR3 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/11/2017 | 12/12/2044 | R$34,471.59 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | CAMPOS | MC 138 kV TR 345/138 kV CAMPOS TR2 RJ | RBF | FT TR 345/138 kV CAMPOS TR2 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$107,257.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | MC 138 kV TR 345/138 kV CAMPOS TR2 RJ | RBF | FT TR 345/138 kV CAMPOS TR2 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$411,587.18 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | MC 138 kV TR 345/138 kV CAMPOS TR2 RJ | RBF | FT TR 345/138 kV CAMPOS TR2 RJ | 062/2001 | IPCA | RBNI | REA 6787/2017 | 11/5/2018 | 8/9/2034 | R$311,693.72 | 6/1/2025 | Ativa | T2017-070 | Adequação na conexão em 138 kV devido à substituição do TR2 (trifásico) pelo AT02 345/138 kV - 3x75 MVA (monofásico) na SE Campos. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | CAMPOS | MC 138 kV TR 345/138 kV CAMPOS TR2 RJ | RBF | FT TR 345/138 kV CAMPOS TR2 RJ | 062/2001 | IPCA | RBNIA | REA 6787/2017 | R$785,344.16 | 6/1/2025 | Prevista | T2017-073 | Adequação do pátio de 138 kV da SE Campos de barra principal e transferência para barra dupla a quatro chaves. | ||||
| AXIA Energia | CAMPOS | MC 138 kV TR 345/138 kV CAMPOS TR2 RJ | RBF | FT TR 345/138 kV CAMPOS TR2 RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 1/24/2014 | 4/19/2034 | R$3,568.05 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR AT02 LADO DE 138KV FASE A - Nº Oper: BANCO DE AUTOTRANSFORMADORES - PMI (004016/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPOS | MC 138 kV TR 345/138 kV CAMPOS TR2 RJ | RBF | FT TR 345/138 kV CAMPOS TR2 RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 1/24/2014 | 4/19/2034 | R$3,568.05 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR AT02 LADO DE 138KV FASE B - Nº Oper: BANCO DE AUTOTRANSFORMADORES - PMI (004017/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPOS | MC 138 kV TR 345/138 kV CAMPOS TR2 RJ | RBF | FT TR 345/138 kV CAMPOS TR2 RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 1/24/2014 | 4/19/2034 | R$3,568.05 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR AT02 LADO DE 138KV FASE C - Nº Oper: BANCO DE AUTOTRANSFORMADORES - PMI (004018/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPOS | MC 138 kV TR 345/138 kV CAMPOS TR2 RJ | RBF | FT TR 345/138 kV CAMPOS TR2 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/12/2019 | 10/7/2035 | R$165,119.30 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | CAMPOS | MC 138 kV TR 345/138 kV CAMPOS TR1 RJ | RBF | FT TR 345/138 kV CAMPOS TR1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$107,257.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | MC 138 kV TR 345/138 kV CAMPOS TR1 RJ | RBF | FT TR 345/138 kV CAMPOS TR1 RJ | 062/2001 | IPCA | RMEL | REN 643/2014 | 9/26/2015 | 8/20/2037 | R$23,398.44 | 6/1/2025 | Ativa | Substituição de 6 para-raios no vão do banco AT01 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPOS | MC 138 kV TR 345/138 kV CAMPOS TR1 RJ | RBF | FT TR 345/138 kV CAMPOS TR1 RJ | 062/2001 | IPCA | RBNI | REA 6787/2017 | 3/12/2025 | 3/11/2053 | R$785,344.16 | 6/1/2025 | Ativa | T2017-073 | Adequação do pátio de 138 kV da SE Campos de barra principal e transferência para barra dupla a quatro chaves. | ||
| AXIA Energia | CAMPOS | MC 138 kV TR 345/138 kV CAMPOS TR1 RJ | RBF | FT TR 345/138 kV CAMPOS TR1 RJ | 062/2001 | IPCA | RMEL | REA 7185/2018 | 8/8/2022 | 4/8/2045 | R$154,943.68 | 6/1/2025 | Ativa | T2018-024 | Adequação do módulo de manobra – conexão de transformador 138 kV, devido a substituição do AT01. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | CAMPOS | MC 138 kV TR 345/138 kV CAMPOS TR1 RJ | RBF | FT TR 345/138 kV CAMPOS TR1 RJ | 062/2001 | IPCA | RBNI | REA 1814/2009 | 1/2/2019 | 1/4/2049 | R$59,301.02 | 6/1/2025 | Ativa | Substituição de TRANSFORMADOR DE CORRENTE: Vão do TR 01. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPOS | MC 138 kV TR 345/138 kV CAMPOS TR1 RJ | RBF | FT TR 345/138 kV CAMPOS TR1 RJ | 062/2001 | IPCA | RBNI | REA 4347/2013 | 5/29/2019 | 5/28/2052 | R$121,890.02 | 6/1/2025 | Ativa | Substituição de 1 disjuntor (capacidade necessária de corrente de curto-circuito igual ou maior a 40 kA) do vão - AT 01 345/138 kV (612). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPOS | MC 138 kV TR 345/138 kV CAMPOS TR1 RJ | RBF | FT TR 345/138 kV CAMPOS TR1 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 8/4/2022 | 8/3/2050 | R$ 394.03 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | CAMPOS | MC 138 kV BC 138 kV 25 Mvar CAMPOS BC2-A RJ BC2-A/BC2-B | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$105,211.38 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | CAMPOS | MC 138 kV BC 138 kV 25 Mvar CAMPOS BC2-A RJ BC2-A/BC2-B | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 3/24/2016 | 8/15/2044 | R$26,941.92 | 6/1/2025 | Ativa | Substituição de Seccionadoras Superadas: Vão do banco de Capacitores 02. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | CAMPOS | MC 138 kV BC 138 kV 25 Mvar CAMPOS BC2-A RJ BC2-A/BC2-B | DIT | 062/2001 | IPCA | RCDMA | REA 6787/2017 | R$615,745.86 | 6/1/2025 | Prevista | T2017-073 | Adequação do pátio de 138 kV da SE Campos de barra principal e transferência para barra dupla a quatro chaves. | |||||
| AXIA Energia | CAMPOS | MC 138 kV BC 138 kV 25 Mvar CAMPOS BC1-A RJ BC1-A/BC1-B | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$105,211.38 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | CAMPOS | MC 138 kV BC 138 kV 25 Mvar CAMPOS BC1-A RJ BC1-A/BC1-B | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 3/16/2016 | 8/7/2044 | R$26,921.41 | 6/1/2025 | Ativa | Substituição de Seccionadoras superadas: Vão do banco de Capacitores 01 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | CAMPOS | MC 138 kV BC 138 kV 25 Mvar CAMPOS BC1-A RJ BC1-A/BC1-B | DIT | 062/2001 | IPCA | RCDMA | REA 6787/2017 | R$615,745.86 | 6/1/2025 | Prevista | T2017-073 | Adequação do pátio de 138 kV da SE Campos de barra principal e transferência para barra dupla a quatro chaves. | |||||
| AXIA Energia | CAMPOS | MC 13,8 kV TT 13,8/0,12 kV CAMPOS TT2 RJ | RBF | FT TR 345/138 kV CAMPOS TR2 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | IB 345 kV MG 345 kV CAMPOS MG1 RJ IB2 | RB | FT MG 345 kV CAMPOS MG1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | IB 345 kV MG 345 kV CAMPOS MG1 RJ IB1 | RB | FT MG 345 kV CAMPOS MG1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | IB 138 kV MG 345 kV CAMPOS MG1 RJ IB1 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$82,866.56 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | CAMPOS | IB 138 kV MG 345 kV CAMPOS MG1 RJ IB1 | DIT | 062/2001 | IPCA | RCDMA | REA 6787/2017 | R$762,899.83 | 6/1/2025 | Prevista | T2017-073 | Adequação do pátio de 138 kV da SE Campos de barra principal e transferência para barra dupla a quatro chaves. | |||||
| AXIA Energia | CAMPOS | IB 138 kV MG 345 kV CAMPOS MG1 RJ IB1 | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 1/2/2019 | 1/1/2052 | R$132,913.99 | 6/1/2025 | Ativa | DISJUNTORES SUPERADOS: Vão de Amarre. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | CAMPOS | IB 138 kV MG 345 kV CAMPOS MG1 RJ IB1 | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 4/18/2022 | 3/25/2053 | R$71,789.88 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | CAMPOS | EL 345 kV CAMPOS LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES | RB | FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,201.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | EL 345 kV CAMPOS LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES | RB | FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES | 062/2001 | IPCA | RBNI | REA 2040/2009 | 4/6/2015 | 9/29/2036 | R$24,915.36 | 6/1/2025 | Ativa | Substituição de 3 pára-raios de SiC por outros de ZnO no vão da linha para Vitória, por superação por curto-circutio. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPOS | EL 345 kV CAMPOS LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES | RB | FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/3/2016 | 3/30/2049 | R$282,737.00 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | CAMPOS | EL 345 kV CAMPOS LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES | RB | FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,201.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | EL 345 kV CAMPOS LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES | RB | FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES | 062/2001 | IPCA | RBNI | REA 2040/2009 | 4/6/2015 | 9/29/2036 | R$24,915.36 | 6/1/2025 | Ativa | Substituição de 3 pára-raios de SiC por outros de ZnO no vão da linha para Viana, por superação por curto-circutio. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPOS | EL 345 kV CAMPOS LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES | RB | FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/3/2016 | 2/16/2049 | R$302,984.03 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | CAMPOS | EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ | RB | FT LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ | 006/2005 | IGPM | RBL | CC 006/2005 | 6/2/2010 | 3/4/2035 | R$ 1,546,031.09 | 6/1/2025 | Ativa | T2000-015 | Contrato de Concessão nº 006/2005 *(Considera adicional de RGR relativo à prorrogação do encargo) | ||
| AXIA Energia | CAMPOS | EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ | RB | FT LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ | 006/2005 | IGPM | RBNI | REA 2376/2010 | 11/30/2012 | 11/23/2036 | R$102,519.84 | 6/1/2025 | Ativa | SE CAMPOS - Substituição dos TC do vão do disjuntor 8522 existente. *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | |||
| AXIA Energia | CAMPOS | EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ | RB | FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,201.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ | RB | FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ | 062/2001 | IPCA | RBNI | REA 2040/2009 | 4/6/2015 | 9/29/2036 | R$24,915.36 | 6/1/2025 | Ativa | Substituição de 3 pára-raios de SiC por outros de ZnO no vão da linha para Macaé 2, por superação por curto-circutio. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPOS | EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ | RB | FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,140,473.89 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ | RB | FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/6/2022 | 6/5/2050 | R$137,043.27 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | CAMPOS | EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ | RB | FT LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,201.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ | RB | FT LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ | 062/2001 | IPCA | RBNI | REA 2040/2009 | 4/6/2015 | 9/29/2036 | R$24,915.36 | 6/1/2025 | Ativa | Substituição de 3 pára-raios de SiC por outros de ZnO no vão da linha para Macaé 1, por superação por curto-circutio. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CAMPOS | EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ | RB | FT LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/3/2017 | 10/25/2048 | R$395,537.55 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$159,930.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-2 RJ | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 11/2/2015 | 11/25/2037 | R$11,755.29 | 6/1/2025 | Ativa | Substituição de 3 para-raios no vão da LT UTEC - Campos circ 2 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-2 RJ | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 4/3/2016 | 9/4/2047 | R$6,426.85 | 6/1/2025 | Ativa | Substituição de DISJUNTORES SUPERADOS: UTEC C2 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-2 RJ | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 4/3/2016 | 9/25/2044 | R$41,899.04 | 6/1/2025 | Ativa | Substituição de transformador de Corrente: UTEC C2 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-2 RJ | DIT | 062/2001 | IPCA | RCDM | REA 6787/2017 | 8/30/2024 | 8/29/2048 | R$778,152.94 | 6/1/2025 | Ativa | T2017-073 | Adequação do pátio de 138 kV da SE Campos de barra principal e transferência para barra dupla a quatro chaves. | |||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$159,930.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 5/13/2016 | 12/6/2038 | R$12,036.24 | 6/1/2025 | Ativa | Substituição de 3 para-raios no vão da LT UTEC - Campos circ 1 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-1 RJ | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 3/22/2017 | 7/22/2049 | R$6,615.54 | 6/1/2025 | Ativa | Substituição de DISJUNTORES SUPERADOS: UTEC C1 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-1 RJ | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 11/10/2016 | 12/2/2045 | R$42,757.28 | 6/1/2025 | Ativa | Substituição de TRANSFORMADOR DE CORRENTE: UTEC C1, * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-1 RJ | DIT | 062/2001 | IPCA | RCDM | REA 6787/2017 | 8/30/2024 | 8/29/2048 | R$778,152.94 | 6/1/2025 | Ativa | T2017-073 | Adequação do pátio de 138 kV da SE Campos de barra principal e transferência para barra dupla a quatro chaves. | |||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$159,930.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 9/29/2015 | 8/23/2037 | R$11,703.64 | 6/1/2025 | Ativa | Substituição de 3 para-raios no vão da LT Campos - Rocha Leão * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ | DIT | 062/2001 | IPCA | RCDM | REA 6787/2017 | 9/13/2024 | 9/12/2048 | R$778,152.94 | 6/1/2025 | Ativa | T2017-073 | Adequação do pátio de 138 kV da SE Campos de barra principal e transferência para barra dupla a quatro chaves. | |||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 1/2/2019 | 1/1/2052 | R$132,913.99 | 6/1/2025 | Ativa | Substituição de DISJUNTORES e TC SUPERADOS: ROCHA LEÃO. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ | DIT | 062/2001 | IPCA | RCDMA | REA 10203/2021 | R$47,841.20 | 6/1/2025 | Prevista | T2019-066 | Adequações da proteção da Entrada de Linha na SE Campos, em função do seccionamento da LT 138 kV Rocha Leão - Campos na SE Iriri. | |||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/2/2019 | 1/4/2049 | R$59,291.86 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV CAMPOS /IRIRI C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$159,930.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV CAMPOS /IRIRI C-2 RJ | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 3/10/2015 | 8/2/2036 | R$11,391.39 | 6/1/2025 | Ativa | Substituição de 3 para-raios no vão da LT Campos - Iriri * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV CAMPOS /IRIRI C-2 RJ | DIT | 062/2001 | IPCA | RCDM | REA 6787/2017 | 8/30/2024 | 8/29/2048 | R$778,152.94 | 6/1/2025 | Ativa | T2017-073 | Adequação do pátio de 138 kV da SE Campos de barra principal e transferência para barra dupla a quatro chaves. | |||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV CAMPOS /IRIRI C-2 RJ | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 1/2/2019 | 1/1/2052 | R$132,913.99 | 6/1/2025 | Ativa | Substituição de DISJUNTORES e TC SUPERADOS: IRIRI. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV CAMPOS /IRIRI C-2 RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/2/2019 | 1/4/2049 | R$59,291.86 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV CAMPOS /C.ITAPEMIRIM C-2 RJ/ES | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$159,930.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV CAMPOS /C.ITAPEMIRIM C-2 RJ/ES | DIT | 062/2001 | IPCA | RCDM | REA 6787/2017 | 8/30/2024 | 8/29/2048 | R$778,152.94 | 6/1/2025 | Ativa | T2017-073 | Adequação do pátio de 138 kV da SE Campos de barra principal e transferência para barra dupla a quatro chaves. | |||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV CAMPOS /C.ITAPEMIRIM C-2 RJ/ES | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 6/11/2017 | 2/2/2041 | R$12,569.70 | 6/1/2025 | Ativa | Substituição de 3 para-raios no vão da LT Campos - C.Itapemirim circ 2 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV CAMPOS /C.ITAPEMIRIM C-2 RJ/ES | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 1/2/2019 | 1/4/2049 | R$19,763.95 | 6/1/2025 | Ativa | Substituição deTRANSORMADOR DE CORRENTE: Cach. Itapemirim C2 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 – 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV CAMPOS /C.ITAPEMIRIM C-2 RJ/ES | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 1/2/2019 | 1/1/2052 | R$135,932.79 | 6/1/2025 | Ativa | DISJUNTORES SUPERADOS: Cach. Itapemirim C2. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV CAMPOS /C.ITAPEMIRIM C-1 RJ/ES | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$159,930.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV CAMPOS /C.ITAPEMIRIM C-1 RJ/ES | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 8/2/2015 | 5/26/2037 | R$11,616.79 | 6/1/2025 | Ativa | Substituição de 3 para-raios no vão da LT Campos - C.Itapemirim circ 1 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV CAMPOS /C.ITAPEMIRIM C-1 RJ/ES | DIT | 062/2001 | IPCA | RCDM | REA 6787/2017 | 8/30/2024 | 8/29/2048 | R$778,152.94 | 6/1/2025 | Ativa | T2017-073 | Adequação do pátio de 138 kV da SE Campos de barra principal e transferência para barra dupla a quatro chaves. | |||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV CAMPOS /C.ITAPEMIRIM C-1 RJ/ES | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 1/2/2019 | 1/1/2052 | R$132,913.99 | 6/1/2025 | Ativa | Substituição de DISJUNTORES e TC SUPERADOS: EL C. ITAPEMIRIM C1. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS LT 138 kV CAMPOS /C.ITAPEMIRIM C-1 RJ/ES | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/2/2019 | 1/4/2049 | R$59,291.86 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS DIST2 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$111,176.76 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS DIST2 | DIT | 062/2001 | IPCA | RCDM | REA 6787/2017 | 10/30/2024 | 10/29/2048 | R$778,152.94 | 6/1/2025 | Ativa | T2017-073 | Adequação do pátio de 138 kV da SE Campos de barra principal e transferência para barra dupla a quatro chaves. | |||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS DIST1 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$111,176.76 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | CAMPOS | EL 138 kV CAMPOS DIST1 | DIT | 062/2001 | IPCA | RCDMA | REA 6787/2017 | R$778,152.94 | 6/1/2025 | Prevista | T2017-073 | Adequação do pátio de 138 kV da SE Campos de barra principal e transferência para barra dupla a quatro chaves. | |||||
| AXIA Energia | CAMPOS | CE 100/-60 Mvar CAMPOS CE1 RJ | RB | FT CE 100/-60 MvAr CAMPOS CE1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,530,717.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | BC 345 kV 60 Mvar CAMPOS BC9 RJ | RB | FT BC 345 kV 60 Mvar CAMPOS BC9 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$206,139.41 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | BC 345 kV 60 Mvar CAMPOS BC10 RJ | RB | FT BC 345 kV 60 Mvar CAMPOS BC10 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$206,139.41 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CAMPOS | BC 138 kV 25 Mvar CAMPOS BC2-B RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$122,812.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | CAMPOS | BC 138 kV 25 Mvar CAMPOS BC2-A RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$122,812.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | CAMPOS | BC 138 kV 25 Mvar CAMPOS BC1-B RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$122,812.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | CAMPOS | BC 138 kV 25 Mvar CAMPOS BC1-A RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$122,812.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CANOINHAS ESU | TR 230/138 kV CANOINHAS ESU TR3 SC | RBF | FT TR 230/138 kV CANOINHAS ESU TR3 SC | 057/2001 | IPCA | RBNI | REA 4892/2014 | 12/3/2017 | 7/13/2052 | R$ 1,787,267.10 | 6/1/2025 | Ativa | T2014-050 | Obra de Substituição Completa - Substituição, na SE Canoinhas, do terceiro autotransformador trifásico TR3 230/138, de 75 MVA, por outro de 150 MVA. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | CANOINHAS ESU | TR 230/138 kV CANOINHAS ESU TR2 SC | RBF | FT TR 230/138 kV CANOINHAS ESU TR2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$377,367.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CANOINHAS ESU | TR 230/138 kV CANOINHAS ESU TR1 SC | RBF | FT TR 230/138 kV CANOINHAS ESU TR1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$377,367.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CANOINHAS ESU | MG 230 kV CANOINHAS ESU MG1 SC | RB | FT MG 230 kV CANOINHAS ESU MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$423,947.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CANOINHAS ESU | MG 230 kV CANOINHAS ESU MG1 SC | RB | FT MG 230 kV CANOINHAS ESU MG1 SC | 057/2001 | IPCA | RBNI | REA 4802/2014 | 8/22/2016 | 7/26/2045 | R$187,059.20 | 6/1/2025 | Ativa | T2014-049 | Complementação, na SE Canoinhas, da infraestrutura do Módulo Geral, referente à instalação de um módulo de conexão em 230 kV, arranjo barra principal e transferência, para o banco de capacitores a ser instalado. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | CANOINHAS ESU | MG 230 kV CANOINHAS ESU MG1 SC | RB | FT MG 230 kV CANOINHAS ESU MG1 SC | 057/2001 | IPCA | RBNI | REA 6630/2017 | 8/7/2017 | 8/6/2045 | R$27,246.34 | 6/1/2025 | Ativa | Subsituição de 1 registrador de perturbação (RDP) e instalação de mais 1 RDP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CANOINHAS ESU | MG 230 kV CANOINHAS ESU MG1 SC | RB | FT MG 230 kV CANOINHAS ESU MG1 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 10/31/2022 | 10/30/2037 | R$5,607.93 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CANOINHAS ESU | MC 230 kV TR 230/138 kV CANOINHAS ESU TR3 SC | RBF | FT TR 230/138 kV CANOINHAS ESU TR3 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$126,634.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CANOINHAS ESU | MC 230 kV TR 230/138 kV CANOINHAS ESU TR3 SC | RBF | FT TR 230/138 kV CANOINHAS ESU TR3 SC | 057/2001 | IPCA | RBNI | REA 4892/2014 | 12/3/2017 | 7/17/2045 | R$117,904.35 | 6/1/2025 | Ativa | T2014-050 | Adequação, na SE Canoinhas, do módulo de conexão 230 kV existente associado ao autotransformador TR3, com a substituição de 3 para-raios e do sistema de proteção, controle e supervisão. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | CANOINHAS ESU | MC 230 kV TR 230/138 kV CANOINHAS ESU TR3 SC | RBF | FT TR 230/138 kV CANOINHAS ESU TR3 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$222,253.60 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CANOINHAS ESU | MC 230 kV TR 230/138 kV CANOINHAS ESU TR3 SC | RBF | FT TR 230/138 kV CANOINHAS ESU TR3 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 6/15/2020 | 6/18/2050 | R$22,577.18 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CANOINHAS ESU | MC 230 kV TR 230/138 kV CANOINHAS ESU TR2 SC | RBF | FT TR 230/138 kV CANOINHAS ESU TR2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$126,634.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CANOINHAS ESU | MC 230 kV TR 230/138 kV CANOINHAS ESU TR1 SC | RBF | FT TR 230/138 kV CANOINHAS ESU TR1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$126,634.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CANOINHAS ESU | MC 230 kV TR 230/138 kV CANOINHAS ESU TR1 SC | RBF | FT TR 230/138 kV CANOINHAS ESU TR1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$222,253.60 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CANOINHAS ESU | MC 230 kV TR 230/138 kV CANOINHAS ESU TR1 SC | RBF | FT TR 230/138 kV CANOINHAS ESU TR1 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 9/30/2020 | 10/3/2050 | R$21,452.65 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CANOINHAS ESU | MC 230 kV BC 230 kV 50 Mvar CANOINHAS ESU BC1 SC | RB | FT BC 230 kV 50 Mvar CANOINHAS ESU BC1 SC | 057/2001 | IPCA | RBNI | REA 4802/2014 | 8/22/2016 | 7/6/2047 | R$981,324.02 | 6/1/2025 | Ativa | T2014-049 | Instalação, na SE Canoinhas, um módulo de conexão 230 kV, arranjo barra principal e transferência, para o banco de capacitores derivação, em 230 kV, de 50 Mvar a ser instalado. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | CANOINHAS ESU | MC 138 kV TR 230/138 kV CANOINHAS ESU TR3 SC | RBF | FT TR 230/138 kV CANOINHAS ESU TR3 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$89,047.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CANOINHAS ESU | MC 138 kV TR 230/138 kV CANOINHAS ESU TR3 SC | RBF | FT TR 230/138 kV CANOINHAS ESU TR3 SC | 057/2001 | IPCA | RBNI | REA 4892/2014 | 12/3/2017 | 7/1/2046 | R$134,699.58 | 6/1/2025 | Ativa | T2014-050 | Adequação, na SE Canoinhas, do módulo de conexão 138 kV existente associado ao autotransformador TR3, com a substituição de 3 para-raios e 3 transformadores de corrente. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | CANOINHAS ESU | MC 138 kV TR 230/138 kV CANOINHAS ESU TR3 SC | RBF | FT TR 230/138 kV CANOINHAS ESU TR3 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$156,285.32 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CANOINHAS ESU | MC 138 kV TR 230/138 kV CANOINHAS ESU TR2 SC | RBF | FT TR 230/138 kV CANOINHAS ESU TR2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$89,047.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CANOINHAS ESU | MC 138 kV TR 230/138 kV CANOINHAS ESU TR1 SC | RBF | FT TR 230/138 kV CANOINHAS ESU TR1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$89,047.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CANOINHAS ESU | MC 138 kV TR 230/138 kV CANOINHAS ESU TR1 SC | RBF | FT TR 230/138 kV CANOINHAS ESU TR1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$156,285.32 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CANOINHAS ESU | MC 138 kV TR 230/138 kV CANOINHAS ESU TR1 SC | RBF | FT TR 230/138 kV CANOINHAS ESU TR1 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 9/28/2022 | 9/30/2052 | R$17,313.64 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CANOINHAS ESU | IB 230 kV MG 230 kV CANOINHAS ESU MG1 SC IB1 | RB | FT MG 230 kV CANOINHAS ESU MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$100,223.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CANOINHAS ESU | IB 230 kV MG 230 kV CANOINHAS ESU MG1 SC IB1 | RB | FT MG 230 kV CANOINHAS ESU MG1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,900.08 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CANOINHAS ESU | EL 230 kV CANOINHAS ESU LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR | RB | FT LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CANOINHAS ESU | EL 230 kV CANOINHAS ESU LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR | RB | FT LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$323,005.58 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CANOINHAS ESU | BC 230 kV 50 Mvar CANOINHAS ESU BC1 SC | RB | FT BC 230 kV 50 Mvar CANOINHAS ESU BC1 SC | 057/2001 | IPCA | RBNI | REA 4802/2014 | 8/22/2016 | 11/25/2039 | R$348,676.13 | 6/1/2025 | Ativa | T2014-049 | Instalação, na SE Canoinhas, de um banco de capacitores em derivação, em 230 kV, de 50 Mvar. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | CARAJAS | MG 230 kV CARAJAS MG1 PA | RB | FT MG 230 kV CARAJAS MG1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$475,298.93 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | CARAJAS | MG 230 kV CARAJAS MG1 PA | RB | FT MG 230 kV CARAJAS MG1 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/6/2017 | 11/19/2034 | R$50,507.96 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | CARAJAS | MG 230 kV CARAJAS MG1 PA | RB | FT MG 230 kV CARAJAS MG1 PA | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 12/26/2012 | 12/25/2027 | R$14,702.39 | 6/1/2025 | Ativa | 01 GPS E 01 RDP DE 8 CANAIS ANALOGICOS E 32 DIGITAIS PROVIDO DE AQUISICAO DE FALTA POR ONDAS VIAJANTES PARA A LINHA LT MBCJCARAJAS Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | CARAJAS | MC 230 kV BC 230 kV 30 Mvar CARAJAS BC1 PA | RB | FT BC 230 kV 30 MVAr CARAJAS BC1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$207,718.21 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | CARAJAS | IB 230 kV MG 230 kV CARAJAS MG1 PA IB1 | RB | FT MG 230 kV CARAJAS MG1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$158,618.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | CARAJAS | EL 230 kV CARAJAS LT 230 kV CARAJAS /MARABA C-1 PA | RB | FT LT 230 kV CARAJAS /MARABA C-1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$260,258.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | CARAJAS | EL 230 kV CARAJAS LT 230 kV CARAJAS /INTEGRADORA C-3 PA | RB | FT LT 230 kV CARAJAS /INTEGRADORA C-3 PA | 058/2001 | IPCA | RBNI | REA 4658/2014 | 9/2/2013 | 12/31/2042 | R$220,629.31 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de linha em 230 kV, arranjo barra dupla a quatro chaves, associada à linha de transmissão 230 kV Carajás / Integradora – C3 transferida à Eletronorte pela Vale S.A. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | CARAJAS | EL 230 kV CARAJAS LT 230 kV CARAJAS /INTEGRADORA C-2 PA | RB | FT LT 230 kV CARAJAS /INTEGRADORA C-2 PA | 058/2001 | IPCA | RBNI | REA 4658/2014 | 9/2/2013 | 12/31/2042 | R$220,629.31 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de linha em 230 kV, arranjo barra dupla a quatro chaves, associada à linha de transmissão 230 kV Carajás / Integradora – C2 transferida à Eletronorte pela Vale S.A. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | CARAJAS | EL 230 kV CARAJAS LT 230 kV CARAJAS /INTEGRADORA C-1 PA | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$260,258.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | CARAJAS | EL 230 kV CARAJAS CONS1 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$260,258.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | CARAJAS | BC 230 kV 30 Mvar CARAJAS BC1 PA | RB | FT BC 230 kV 30 MVAr CARAJAS BC1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$177,887.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CASCAVEL OEST | MG 500 kV CASCAVEL OEST MG3 PR | RB | FT MG 500 kV CASCAVEL OEST MG3 PR | 057/2001 | IPCA | RBNI | REA 8795/2020 | 5/8/2023 | 5/8/2041 | R$500,447.14 | 6/1/2025 | Ativa | T2020-030 | Instalar, na SE CASCAVEL OEST, complemento de módulo geral com MIG-A, em 525 kV, arranjo Disjuntor e Meio, para a reencabeçamento da LT para Guaíra. | ||
| AXIA Energia Sul | CASCAVEL OEST | EL 525 kV CASCAVEL OEST LT 525 kV CASCAVEL OEST /GUAIRA C-1 PR | RB | FT LT 525 kV CASCAVEL OEST /GUAIRA C-1 PR | 057/2001 | IPCA | RBNI | REA 8795/2020 | 5/8/2023 | 5/8/2052 | R$ 1,697,499.48 | 6/1/2025 | Ativa | T2020-030 | Instalação, na SE CASCAVEL OEST, de uma entrada de linha, em 525 kV, para a LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR, arranjo DJM, passar a operar em 525kV. | ||
| AXIA Energia Sul | CASCAVEL OEST | EL 500 kV CASCAVEL OEST LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR | RB | FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR | 004/2004 | IGPM | RBL | CC 004/2004 | 10/31/2005 | 2/18/2034 | R$ 4,989,937.57 | 6/1/2025 | Ativa | Contrato de Concessão nº 004/2004 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Norte | CASTANHAL | MG 230 kV CASTANHAL MG2 PA | RB | FT MG 230 kV CASTANHAL MG2 PA | 058/2001 | IPCA | RBNI | REA 2152/2009 | 11/19/2012 | 9/15/2034 | R$543,956.15 | 6/1/2025 | Ativa | T2009-161 | Módulo de Infraestrutura Geral para Acessante e Módulos de Infraestrutura de Manobra para as entradas de linhas, em 230 kV na SE Castanhal, dos bays referentes as SEs Utinga e Santa Maria. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | CASTANHAL | EL 230 kV CASTANHAL LT 230 kV UTINGA /CASTANHAL C-1 PA | RB | FT LT 230 kV UTINGA /CASTANHAL C-1 PA | 058/2001 | IPCA | RBNI | REA 2152/2009 | 11/19/2012 | 4/13/2043 | R$ 1,009,817.68 | 6/1/2025 | Ativa | T2009-161 | Instalar, na SE CASTANHAL, um módulo de entrada de linha para o circuito LT 230 kV UTINGA /CASTANHAL C-1 PA originado do seccionamento do circuito LT 230 kV UTINGA /SANTA MARIA C-1 PA na SE CASTANHAL. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | CASTANHAL | EL 230 kV CASTANHAL LT 230 kV CASTANHAL /SANTA MARIA C-2 PA | RB | FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA | 058/2001 | IPCA | RBNI | REA 2152/2009 | 11/19/2012 | 5/6/2043 | R$ 1,010,020.17 | 6/1/2025 | Ativa | T2009-161 | Instalar, na SE CASTANHAL, um módulo de entrada de linha para o circuito LT 230 kV CASTANHAL /SANTA MARIA C-1 PA originado do seccionamento do circuito LT 230 kV UTINGA /SANTA MARIA C-1 PA na SE CASTANHAL. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CATU | TT 69/13,8 kV CATU TA1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CATU | TT 69/13,8 kV CATU TA1 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/12/2021 | 4/15/2051 | R$2,406.06 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | CATU | TT 69/0 kV CATU TA2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CATU | TR 230/69 kV CATU TR3 BA | RBF | FT TR 230/69 kV CATU TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | TR 230/69 kV CATU TR2 BA | RBF | FT TR 230/69 kV CATU TR2 BA | 061/2001 | IPCA | RBNI | REA 2173/2009 | 9/24/2013 | 6/14/2048 | R$ 1,327,733.51 | 6/1/2025 | Ativa | T2009-186 | Obra de Substituição Completa - Substituir o transformador 230/69/13,8 kV - 62 MVA por outro de 100 MVA. RAP corrigida de modo a considerar a Receita autorizada total do equipamento novo. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CATU | TR 230/69 kV CATU TR1 BA | RBF | FT TR 230/69 kV CATU TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | TR 230/69 kV CATU TR1 BA | RBF | FT TR 230/69 kV CATU TR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/4/2022 | 7/12/2057 | R$2,833.81 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CATU | RTS 13,8 kV 5 Mvar CATU RT2 BA | RBF | FT TR 230/69 kV CATU TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | RTS 13,8 kV 5 Mvar CATU RT2 BA | RBF | FT TR 230/69 kV CATU TR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$351,841.75 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | RTS 13,8 kV 5 Mvar CATU RT1 BA | RBF | FT TR 230/69 kV CATU TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | RTS 13,8 kV 5 Mvar CATU RT1 BA | RBF | FT TR 230/69 kV CATU TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$351,841.75 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | MG 230 kV CATU MG1 BA | RB | FT MG 230 kV CATU MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$680,816.77 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | MG 230 kV CATU MG1 BA | RB | FT MG 230 kV CATU MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,910,486.88 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | MG 230 kV CATU MG1 BA | RB | FT MG 230 kV CATU MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,761,235.48 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | MG 230 kV CATU MG1 BA | RB | FT MG 230 kV CATU MG1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 4/15/2016 | 4/14/2044 | R$3,227.27 | 6/1/2025 | Ativa | Revitalização Necessária: Implantação de Switches Industriais * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CATU | MG 230 kV CATU MG1 BA | RB | FT MG 230 kV CATU MG1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 8/30/2016 | 8/29/2033 | R$7,609.40 | 6/1/2025 | Ativa | Implantação de Banco de Baterias * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CATU | MG 230 kV CATU MG1 BA | RB | FT MG 230 kV CATU MG1 BA | 061/2001 | IPCA | RBNI | REN 905/2020 | 5/28/2021 | 6/13/2049 | R$64,511.42 | 6/1/2025 | Ativa | MIM ASSOCIADO: Instalar um módulo de Entrada de linha 69kV, na SE CATU, arranjo barra principal e transferência, com destino à Entre Rios C2 - 02V8 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CATU | MG 230 kV CATU MG1 BA | RB | FT MG 230 kV CATU MG1 BA | 061/2001 | IPCA | RBNI | REN 905/2020 | 5/28/2021 | 6/13/2049 | R$64,511.42 | 6/1/2025 | Ativa | MIM ASSOCIADO: Instalar um módulo de entrada de linha 69kV, na SE CATU, arranjo barra principal e transferência, com destino à Alagoinhas - 02V7 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CATU | MG 230 kV CATU MG1 BA | RB | FT MG 230 kV CATU MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/23/2021 | 8/24/2043 | R$ 1,008,470.28 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CATU | MC 69 kV TT 69/13,8 kV CATU TA1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CATU | MC 69 kV TT 69/0 kV CATU TA2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CATU | MC 69 kV TR 230/69 kV CATU TR3 BA | RBF | FT TR 230/69 kV CATU TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | MC 69 kV TR 230/69 kV CATU TR3 BA | RBF | FT TR 230/69 kV CATU TR3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/14/2021 | 4/13/2045 | R$7,815.03 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CATU | MC 69 kV TR 230/69 kV CATU TR2 BA | RBF | FT TR 230/69 kV CATU TR2 BA | 061/2001 | IPCA | RBNI | REA 2173/2009 | 9/24/2013 | 12/2/2045 | R$289,014.86 | 6/1/2025 | Ativa | T2009-186 | Adequação do CT 69 kV devido a substituição do transformador 230/69/13,8 kV - 62 MVA por outro transformador 230/69/13,8 kV - 100 MVA *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CATU | MC 69 kV TR 230/69 kV CATU TR2 BA | RBF | FT TR 230/69 kV CATU TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | MC 69 kV TR 230/69 kV CATU TR1 BA | RBF | FT TR 230/69 kV CATU TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | MC 230 kV TR 230/69 kV CATU TR3 BA | RBF | FT TR 230/69 kV CATU TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,694.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | MC 230 kV TR 230/69 kV CATU TR3 BA | RBF | FT TR 230/69 kV CATU TR3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/2/2019 | 2/8/2049 | R$70,141.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CATU | MC 230 kV TR 230/69 kV CATU TR2 BA | RBF | FT TR 230/69 kV CATU TR2 BA | 061/2001 | IPCA | RBNI | REA 2173/2009 | 9/24/2013 | 6/24/2042 | R$241,118.26 | 6/1/2025 | Ativa | T2009-186 | Adequação da CT 230 kV devido à substituição do transformador 230/69/13,8 kV - 62 MVA por outro transformador 230/69/13,8 kV - 100 MVA *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CATU | MC 230 kV TR 230/69 kV CATU TR2 BA | RBF | FT TR 230/69 kV CATU TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,694.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | MC 230 kV TR 230/69 kV CATU TR2 BA | RBF | FT TR 230/69 kV CATU TR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$431,291.40 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | MC 230 kV TR 230/69 kV CATU TR2 BA | RBF | FT TR 230/69 kV CATU TR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$397,597.97 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | MC 230 kV TR 230/69 kV CATU TR1 BA | RBF | FT TR 230/69 kV CATU TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,694.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | MC 230 kV TR 230/69 kV CATU TR1 BA | RBF | FT TR 230/69 kV CATU TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$431,291.40 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | MC 230 kV TR 230/69 kV CATU TR1 BA | RBF | FT TR 230/69 kV CATU TR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/24/2021 | 12/23/2045 | R$25,734.46 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CATU | MC 13,8 kV TR 230/69 kV CATU TR2 BA | RBF | FT TR 230/69 kV CATU TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$48,477.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | MC 13,8 kV TR 230/69 kV CATU TR1 BA | RBF | FT TR 230/69 kV CATU TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$48,477.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | IB 69 kV MG 230 kV CATU MG1 BA IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CATU | IB 230 kV MG 230 kV CATU MG1 BA IB2 | RB | FT MG 230 kV CATU MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,085.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | IB 230 kV MG 230 kV CATU MG1 BA IB1 | RB | FT MG 230 kV CATU MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,085.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | IB 13,8 kV MG 230 kV CATU MG1 BA IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$30,696.61 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CATU | EL 69 kV CATU LT 69 kV CATU /COTEGIPE C-2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CATU | EL 69 kV CATU LT 69 kV CATU /COTEGIPE C-2 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/21/2022 | 4/20/2046 | R$8,086.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | CATU | EL 69 kV CATU LT 69 kV CATU /COTEGIPE C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CATU | EL 69 kV CATU LT 69 kV CATU /COTEGIPE C-1 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/22/2022 | 4/21/2046 | R$8,087.15 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | CATU | EL 69 kV CATU DIST8 | DIT | 061/2001 | IPCA | RCDM | REN 905/2020 | 5/28/2021 | 7/17/2052 | R$573,339.17 | 6/1/2025 | Ativa | Instalar um módulo de entrada de linha 69kV, na SE CATU, arranjo barra principal e transferência, com destino à Alagoinhas - 02V7 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | CATU | EL 69 kV CATU DIST7 | DIT | 061/2001 | IPCA | RCDM | REN 905/2020 | 5/28/2021 | 7/17/2052 | R$573,339.17 | 6/1/2025 | Ativa | Instalar um módulo de Entrada de linha 69kV, na SE CATU, arranjo barra principal e transferência, com destino à Entre Rios C2 - 02V8 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | CATU | EL 69 kV CATU DIST6 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CATU | EL 69 kV CATU DIST6 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/27/2018 | 9/29/2048 | R$20,730.56 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | CATU | EL 69 kV CATU DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CATU | EL 69 kV CATU DIST5 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/10/2022 | 4/9/2046 | R$8,078.41 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | CATU | EL 69 kV CATU DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CATU | EL 69 kV CATU DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CATU | EL 69 kV CATU DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CATU | EL 69 kV CATU DIST2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/10/2022 | 6/9/2046 | R$8,123.40 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | CATU | EL 69 kV CATU DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CATU | EL 230 kV CATU SCHIN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CATU | EL 230 kV CATU LT 230 kV OLINDINA /CATU C-1 BA | RB | FT LT 230 kV OLINDINA /CATU C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | EL 230 kV CATU LT 230 kV OLINDINA /CATU C-1 BA | RB | FT LT 230 kV OLINDINA /CATU C-1 BA | 061/2001 | IPCA | RBNIA | REA 12983/2022 | R$234,325.58 | 6/1/2025 | Prevista | T2022-113 | Adequação dos sistemas de proteção, telecomunicações, supervisão e controle no módulo de manobra - entrada de linha da linha de transmissão seccionada na SE Catu | ||||
| AXIA Energia Nordeste | CATU | EL 230 kV CATU LT 230 kV OLINDINA /CATU C-1 BA | RB | FT LT 230 kV OLINDINA /CATU C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/5/2020 | 1/17/2047 | R$149,510.79 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CATU | EL 230 kV CATU LT 230 kV ITABAIANINHA /CATU C-1 SE/BA | RB | FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | EL 230 kV CATU LT 230 kV ITABAIANINHA /CATU C-1 SE/BA | RB | FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/29/2021 | 6/29/2042 | R$243,200.46 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CATU | EL 230 kV CATU LT 230 kV CATU /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV CATU /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | EL 230 kV CATU LT 230 kV CATU /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV CATU /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/16/2021 | 6/12/2044 | R$152,980.47 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CATU | EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-2 BA | RB | FT LT 230 kV CATU /CAMACARI IV C-2 BA | 061/2001 | IPCA | RBNI | REA 2891/2011 | 11/5/2014 | 5/7/2041 | R$78,138.45 | 6/1/2025 | Ativa | T2010-075 | Adequar a proteção da EL da LT 230 kV Camaçari II/Catu- C2, devido ao remanejamento da linha para Camaçari IV *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CATU | EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-2 BA | RB | FT LT 230 kV CATU /CAMACARI IV C-2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-2 BA | RB | FT LT 230 kV CATU /CAMACARI IV C-2 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 9/29/2017 | 10/2/2047 | R$5,476.10 | 6/1/2025 | Ativa | SUBTITUIÇÃO DE ISOLADORES SUPORTE DA CHAVE SECCIONADORA, POSIÇÃO 34M2-6 DA SUB CATU * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CATU | EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-2 BA | RB | FT LT 230 kV CATU /CAMACARI IV C-2 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 10/1/2017 | 10/4/2047 | R$5,454.13 | 6/1/2025 | Ativa | SUBTITUIÇÃO DE ISOLADORES SUPORTE DA CHAVE SECCIONADORA, POSIÇÃO 34M2-2 DA SUB CATU * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CATU | EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-2 BA | RB | FT LT 230 kV CATU /CAMACARI IV C-2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/19/2020 | 9/17/2045 | R$170,549.04 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CATU | EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-1 BA | RB | FT LT 230 kV CATU /CAMACARI IV C-1 BA | 061/2001 | IPCA | RBNI | REA 2891/2011 | 10/13/2014 | 4/14/2041 | R$77,945.33 | 6/1/2025 | Ativa | T2010-075 | Adequar a proteção da EL da LT 230 kV Camaçari II/Catu- C1, devido ao remanejamento da linha para Camaçari IV *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CATU | EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-1 BA | RB | FT LT 230 kV CATU /CAMACARI IV C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-1 BA | RB | FT LT 230 kV CATU /CAMACARI IV C-1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 6/14/2017 | 6/17/2047 | R$5,457.91 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE ISOLADORES DE VIDRO POR PORCELANA, EM ATENDIMENTO A RECOMENDAÇÃO RAP ONS 0053/2013, DA CHAVE SECCIONADORA, POSIÇÃO 34M1-2 DA SUB CATU * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CATU | EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-1 BA | RB | FT LT 230 kV CATU /CAMACARI IV C-1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 10/4/2017 | 10/7/2047 | R$2,569.27 | 6/1/2025 | Ativa | SUBTITUIÇÃO DE ISOLADORES SUPORTE DA CHAVE SECCIONADORA, POSIÇÃO 34M1-6 DA SUB CATU * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CATU | EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-1 BA | RB | FT LT 230 kV CATU /CAMACARI IV C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/7/2020 | 5/1/2047 | R$152,869.21 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CATU | EL 230 kV CATU LT 230 kV ALAGOINHAS II /CATU C-1 BA | RB | FT LT 230 kV ALAGOINHAS II /CATU C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CATU | EL 230 kV CATU LT 230 kV ALAGOINHAS II /CATU C-1 BA | RB | FT LT 230 kV ALAGOINHAS II /CATU C-1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 9/21/2017 | 9/24/2047 | R$5,472.35 | 6/1/2025 | Ativa | SUBTITUIÇÃO DE ISOLADORES SUPORTE DA CHAVE SECCIONADORA, POSIÇÃO 34L3-6 DA SUB CATU * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CATU | EL 230 kV CATU LT 230 kV ALAGOINHAS II /CATU C-1 BA | RB | FT LT 230 kV ALAGOINHAS II /CATU C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/21/2021 | 3/20/2045 | R$183,499.72 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CATU | EL 230 kV CATU FERBASA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CATU | EL 230 kV CATU FERBASA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/13/2021 | 2/5/2043 | R$137,806.04 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | CATU | EL 13,8 kV CATU POJUCA 01Y5 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$52,583.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CATU | EL 13,8 kV CATU POJUCA 01Y5 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$147,558.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CATU | EL 13,8 kV CATU POJUCA 01Y5 | DIT | 061/2001 | IPCA | RCDM | REA 5484/2015 | 11/22/2016 | 8/19/2048 | R$26,400.21 | 6/1/2025 | Ativa | EL 13,8 kV CATU DIST4 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | CATU | EL 13,8 kV CATU POJUCA 01Y5 | DIT | 061/2001 | IPCA | RCDM | REA 5484/2015 | 11/21/2016 | 11/20/2049 | R$27,984.66 | 6/1/2025 | Ativa | Substituição de disjuntor da EL POJUCA (21Y5) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | CATU | EL 13,8 kV CATU POJUCA 01Y4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$52,583.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CATU | EL 13,8 kV CATU POJUCA 01Y4 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$147,558.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CATU | EL 13,8 kV CATU POJUCA 01Y4 | DIT | 061/2001 | IPCA | RCDM | REA 5484/2015 | 11/22/2016 | 6/13/2047 | R$29,404.20 | 6/1/2025 | Ativa | EL 13,8 kV CATU DIST3 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | CATU | EL 13,8 kV CATU POJUCA 01Y4 | DIT | 061/2001 | IPCA | RCDM | REA 5484/2015 | 11/21/2016 | 11/20/2049 | R$27,984.66 | 6/1/2025 | Ativa | Substituição de disjuntor da EL POJUCA (21Y4) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | CATU | EL 13,8 kV CATU CID. CATU | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$52,583.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CATU | EL 13,8 kV CATU CID. CATU | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$147,558.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CATU | EL 13,8 kV CATU CID. CATU | DIT | 061/2001 | IPCA | RCDM | REA 5484/2015 | 11/22/2016 | 7/19/2046 | R$32,408.19 | 6/1/2025 | Ativa | EL 13,8 kV CATU DIST2 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | CATU | EL 13,8 kV CATU CID. CATU | DIT | 061/2001 | IPCA | RCDM | REA 5484/2015 | 11/21/2016 | 11/20/2049 | R$27,984.66 | 6/1/2025 | Ativa | Substituição de disjuntor da EL CATU (21Y1) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | CATU | EL 13,8 kV CATU CATU 01Y1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$52,583.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CATU | EL 13,8 kV CATU CATU 01Y1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$147,558.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CATU | EL 13,8 kV CATU CATU 01Y1 | DIT | 061/2001 | IPCA | RCDM | REA 5484/2015 | 11/22/2016 | 1/13/2050 | R$20,778.67 | 6/1/2025 | Ativa | EL 13,8 kV CATU DIST1 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | CATU | EL 13,8 kV CATU CATU 01Y1 | DIT | 061/2001 | IPCA | RCDM | REA 5484/2015 | 11/21/2016 | 11/20/2049 | R$27,984.66 | 6/1/2025 | Ativa | Substituição de disjuntor da EL CIDADE CATU (21Y2) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | CAUIPE | TT 69/0 kV CAUIPE TA2 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAUIPE | TT 69/0 kV CAUIPE TA1 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAUIPE | TT 69/0 kV CAUIPE TA1 CE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$248,222.69 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAUIPE | TT 69/0 kV CAUIPE TA1 CE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$228,831.00 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAUIPE | TR 69/13,8 kV CAUIPE TR1 CE | RB | FT MG 230 kV CAUIPE MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAUIPE | TR 230/69 kV CAUIPE TR3 CE | RBF | FT TR 230/69 kV CAUIPE TR3 CE | 061/2001 | IPCA | RBNI | REA 2968/2011 | 6/17/2018 | 12/13/2052 | R$ 2,009,323.24 | 6/1/2025 | Ativa | T2011-031 | Instalar, na SE Cauípe, o 3° transformador 230/69 kV - 100 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CAUIPE | TR 230/69 kV CAUIPE TR2 CE | RBF | FT TR 230/69 kV CAUIPE TR2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAUIPE | TR 230/69 kV CAUIPE TR1 CE | RBF | FT TR 230/69 kV CAUIPE TR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAUIPE | TR 230/69 kV CAUIPE TR1 CE | RBF | FT TR 230/69 kV CAUIPE TR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAUIPE | TR 230/69 kV CAUIPE TR1 CE | RBF | FT TR 230/69 kV CAUIPE TR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$913,997.96 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAUIPE | MG 230 kV CAUIPE MG1 CE | RB | FT MG 230 kV CAUIPE MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$529,279.52 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAUIPE | MG 230 kV CAUIPE MG1 CE | RB | FT MG 230 kV CAUIPE MG1 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/31/2013 | 10/30/2030 | R$21,199.53 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCOS DE BATERIAS 800A1 E 800A2 DE 125 Vcc. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAUIPE | MG 230 kV CAUIPE MG1 CE | RB | FT MG 230 kV CAUIPE MG1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,485,247.78 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAUIPE | MG 230 kV CAUIPE MG1 CE | RB | FT MG 230 kV CAUIPE MG1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,369,216.98 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAUIPE | MG 230 kV CAUIPE MG1 CE | RB | FT MG 230 kV CAUIPE MG1 CE | 061/2001 | IPCA | RMEL | REN 443/2011 | 7/9/2016 | 7/8/2033 | R$7,076.54 | 6/1/2025 | Ativa | Implantação de Banco de Baterias * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAUIPE | MG 230 kV CAUIPE MG1 CE | RB | FT MG 230 kV CAUIPE MG1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/18/2022 | 5/20/2039 | R$350,060.94 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAUIPE | MC 69 kV TT 69/0 kV CAUIPE TA2 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAUIPE | MC 69 kV TT 69/0 kV CAUIPE TA1 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAUIPE | MC 69 kV TR 69/13,8 kV CAUIPE TR1 CE | RB | FT MG 230 kV CAUIPE MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAUIPE | MC 69 kV TR 230/69 kV CAUIPE TR3 CE | RBF | FT TR 230/69 kV CAUIPE TR3 CE | 061/2001 | IPCA | RBNI | REA 2968/2011 | 6/17/2018 | 3/13/2048 | R$535,652.84 | 6/1/2025 | Ativa | T2011-031 | Instalar, na SE Cauípe, um módulo de conexão, em 69 kV, arranjo barra principal e transferência, para o 3° transformador 230/69 kV - 100 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CAUIPE | MC 69 kV TR 230/69 kV CAUIPE TR2 CE | RBF | FT TR 230/69 kV CAUIPE TR2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAUIPE | MC 69 kV TR 230/69 kV CAUIPE TR2 CE | RBF | FT TR 230/69 kV CAUIPE TR2 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/28/2022 | 12/27/2050 | R$2,342.90 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAUIPE | MC 69 kV TR 230/69 kV CAUIPE TR1 CE | RBF | FT TR 230/69 kV CAUIPE TR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAUIPE | MC 69 kV TR 230/69 kV CAUIPE TR1 CE | RBF | FT TR 230/69 kV CAUIPE TR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAUIPE | MC 69 kV TR 230/69 kV CAUIPE TR1 CE | RBF | FT TR 230/69 kV CAUIPE TR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$162,185.50 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAUIPE | MC 69 kV TR 230/69 kV CAUIPE TR1 CE | RBF | FT TR 230/69 kV CAUIPE TR1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/10/2022 | 12/10/2051 | R$16,060.42 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAUIPE | MC 230 kV TR 230/69 kV CAUIPE TR3 CE | RBF | FT TR 230/69 kV CAUIPE TR3 CE | 061/2001 | IPCA | RBNI | REA 2968/2011 | 6/17/2018 | 8/1/2048 | R$ 1,383,684.94 | 6/1/2025 | Ativa | T2011-031 | Instalar, na SE Cauípe, um módulo de conexão, em 230 kV, arranjo barra principal e transferência, para o 3° transformador 230/69 kV - 100 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CAUIPE | MC 230 kV TR 230/69 kV CAUIPE TR2 CE | RBF | FT TR 230/69 kV CAUIPE TR2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAUIPE | MC 230 kV TR 230/69 kV CAUIPE TR1 CE | RBF | FT TR 230/69 kV CAUIPE TR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAUIPE | MC 230 kV TR 230/69 kV CAUIPE TR1 CE | RBF | FT TR 230/69 kV CAUIPE TR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$410,719.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAUIPE | MC 230 kV TR 230/69 kV CAUIPE TR1 CE | RBF | FT TR 230/69 kV CAUIPE TR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$378,633.35 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAUIPE | MC 230 kV TR 230/69 kV CAUIPE TR1 CE | RBF | FT TR 230/69 kV CAUIPE TR1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/9/2021 | 6/8/2049 | R$5,020.58 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAUIPE | IB 69 kV MG 230 kV CAUIPE MG1 CE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAUIPE | IB 69 kV MG 230 kV CAUIPE MG1 CE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$118,244.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAUIPE | IB 69 kV MG 230 kV CAUIPE MG1 CE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$109,007.13 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAUIPE | IB 230 kV MG 230 kV CAUIPE MG1 CE IB1 | RB | FT MG 230 kV CAUIPE MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,837.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAUIPE | EL 69 kV CAUIPE DIST7 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAUIPE | EL 69 kV CAUIPE DIST6 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAUIPE | EL 69 kV CAUIPE DIST6 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAUIPE | EL 69 kV CAUIPE DIST6 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAUIPE | EL 69 kV CAUIPE DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAUIPE | EL 69 kV CAUIPE DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAUIPE | EL 69 kV CAUIPE DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAUIPE | EL 69 kV CAUIPE DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAUIPE | EL 69 kV CAUIPE DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAUIPE | EL 69 kV CAUIPE DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAUIPE | EL 69 kV CAUIPE DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAUIPE | EL 69 kV CAUIPE DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAUIPE | EL 69 kV CAUIPE DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAUIPE | EL 69 kV CAUIPE DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAUIPE | EL 69 kV CAUIPE DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CAUIPE | EL 230 kV CAUIPE LT 230 kV CAUIPE /SOBRAL II C-1 CE | RB | FT LT 230 kV CAUIPE /SOBRAL II C-1 CE | 061/2001 | IPCA | RBNI | REA 2460/2010 | 11/21/2013 | 2/23/2044 | R$240,935.49 | 6/1/2025 | Ativa | T2009-117 | Adequação do módulo de manobra entrada de linha, na SE Cauípe, em 230 kV associado às adequações na LT 230 kV Cauípe - Sobral II C1. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CAUIPE | EL 230 kV CAUIPE LT 230 kV CAUIPE /SOBRAL II C-1 CE | RB | FT LT 230 kV CAUIPE /SOBRAL II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAUIPE | EL 230 kV CAUIPE LT 230 kV CAUIPE /SOBRAL II C-1 CE | RB | FT LT 230 kV CAUIPE /SOBRAL II C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$596,907.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAUIPE | EL 230 kV CAUIPE LT 230 kV CAUIPE /SOBRAL II C-1 CE | RB | FT LT 230 kV CAUIPE /SOBRAL II C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$550,275.38 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAUIPE | EL 230 kV CAUIPE LT 230 kV CAUIPE /MARACANAU C-1 CE | RB | FT LT 230 kV CAUIPE /MARACANAU C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAUIPE | EL 230 kV CAUIPE LT 230 kV CAUIPE /MARACANAU C-1 CE | RB | FT LT 230 kV CAUIPE /MARACANAU C-1 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 8/16/2014 | 8/24/2045 | R$17,585.19 | 6/1/2025 | Ativa | Revitalização Necessária: SUBSTITUIÇÃO DOS TC 94S1 FASE A. Incluído no recurso contra a REH 2.098/2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAUIPE | EL 230 kV CAUIPE LT 230 kV CAUIPE /MARACANAU C-1 CE | RB | FT LT 230 kV CAUIPE /MARACANAU C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$596,907.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAUIPE | EL 230 kV CAUIPE LT 230 kV CAUIPE /MARACANAU C-1 CE | RB | FT LT 230 kV CAUIPE /MARACANAU C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$550,275.38 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAUIPE | EL 230 kV CAUIPE LT 230 kV CAUIPE /MARACANAU C-1 CE | RB | FT LT 230 kV CAUIPE /MARACANAU C-1 CE | 061/2001 | IPCA | RBNI | REA 5861/2016 | 6/10/2016 | 6/9/2044 | R$21,851.09 | 6/1/2025 | Ativa | EL 230 kV CAUIPE LT 230 kV CAUIPE /FORTALEZA II C-3 CE * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAUIPE | EL 230 kV CAUIPE LT 230 kV CAUIPE /MARACANAU C-1 CE | RB | FT LT 230 kV CAUIPE /MARACANAU C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/11/2018 | 6/13/2048 | R$18,790.88 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CAUIPE | EL 230 kV CAUIPE LT 230 kV CAUIPE /FORTALEZA II C-2 CE | RB | FT LT 230 kV CAUIPE /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAUIPE | EL 230 kV CAUIPE LT 230 kV CAUIPE /FORTALEZA II C-2 CE | RB | FT LT 230 kV CAUIPE /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBNI | REA 5861/2016 | 6/10/2016 | 6/9/2044 | R$21,851.09 | 6/1/2025 | Ativa | EL 230 kV CAUIPE LT 230 kV CAUIPE /FORTALEZA II C-2 CE * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CAUIPE | EL 230 kV CAUIPE LT 230 kV CAUIPE /FORTALEZA II C-1 CE | RB | FT LT 230 kV CAUIPE /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CAUIPE | EL 230 kV CAUIPE LT 230 kV CAUIPE /FORTALEZA II C-1 CE | RB | FT LT 230 kV CAUIPE /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBNI | REA 5861/2016 | 6/10/2016 | 6/9/2044 | R$21,851.09 | 6/1/2025 | Ativa | EL 230 kV CAUIPE LT 230 kV CAUIPE /FORTALEZA II C-1 CE * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CAXIAS | TR 525/230 kV CAXIAS TRR1 RS | RB | FT TR 525/230 kV CAXIAS TRR1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$558,003.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS | TR 525/230 kV CAXIAS TR3 RS | RB | FT TR 525/230 kV CAXIAS TR3 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,674,009.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS | TR 525/230 kV CAXIAS TR2 RS | RB | FT TR 525/230 kV CAXIAS TR2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,674,009.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS | TR 525/230 kV CAXIAS TR1 RS | RB | FT TR 525/230 kV CAXIAS TR1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,674,009.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS | TR 525/230 kV CAXIAS TR1 RS | RB | FT TR 525/230 kV CAXIAS TR1 RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,938,023.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS | TR 525/230 kV CAXIAS TR1 RS | RB | FT TR 525/230 kV CAXIAS TR1 RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,488,557.09 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS | RTB 525 kV 50 Mvar CAXIAS RTR2 RS | RB | FT RTB 525 kV 50 Mvar CAXIAS RTR2 RS | 057/2001 | IPCA | RBNI | REA 8795/2020 | 5/8/2022 | 9/26/2050 | R$913,108.86 | 6/1/2025 | Ativa | T2020-029 | Instalar, na SE CAXIAS, um reator de barra monofásico reserva RTR2 525 kV - 50 Mvar. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | CAXIAS | RTB 525 kV 50 Mvar CAXIAS RTR1 RS | RB | FT RTB 525 kV 50 Mvar CAXIAS RTR1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$223,201.61 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS | RTB 525 kV 150 Mvar CAXIAS RT2 RS | RB | FT RTB 525 kV 150 Mvar CAXIAS RT2 RS | 057/2001 | IPCA | RBNI | REA 8795/2020 | 5/8/2022 | 7/18/2056 | R$ 2,667,880.68 | 6/1/2025 | Ativa | T2020-029 | Instalar, na SE CAXIAS, um banco de reatores de barra monofásicos RT2 525 kV - 150 Mvar. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | CAXIAS | RTB 525 kV 150 Mvar CAXIAS RT1 RS | RB | FT RTB 525 kV 150 Mvar CAXIAS RT1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$669,604.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS | MG 525 kV CAXIAS MG1 RS | RB | FT MG 525 kV CAXIAS MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,505,162.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS | MG 525 kV CAXIAS MG1 RS | RB | FT MG 525 kV CAXIAS MG1 RS | 057/2001 | IPCA | RBNI | REA 8795/2020 | 5/8/2022 | 7/25/2052 | R$884,796.27 | 6/1/2025 | Ativa | T2020-029 | Complementação do módulo geral da SE Caxias com um módulo de infraestrutura de manobra 525 kV. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | CAXIAS | MG 525 kV CAXIAS MG1 RS | RB | FT MG 525 kV CAXIAS MG1 RS | 057/2001 | IPCA | RBNI | REA 5861/2016 | 6/3/2019 | 6/2/2036 | R$13,686.64 | 6/1/2025 | Ativa | Instalação de 1 carregador de baterias de 48 Vcc * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CAXIAS | MG 525 kV CAXIAS MG1 RS | RB | FT MG 525 kV CAXIAS MG1 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 2/18/2020 | 3/5/2039 | R$179,209.97 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CAXIAS | MC 525 kV TR 525/230 kV CAXIAS TR3 RS | RB | FT TR 525/230 kV CAXIAS TR3 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$358,630.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS | MC 525 kV TR 525/230 kV CAXIAS TR2 RS | RB | FT TR 525/230 kV CAXIAS TR2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$358,630.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS | MC 525 kV TR 525/230 kV CAXIAS TR2 RS | RB | FT TR 525/230 kV CAXIAS TR2 RS | 057/2001 | IPCA | RMEL | REN 643/2014 | 11/25/2015 | 11/24/2039 | R$22,948.08 | 6/1/2025 | Ativa | Substituição pararaios 525kV do TF2. [MC 500 kV TR 500/230 kV CAXIAS TR2 RS] Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CAXIAS | MC 525 kV TR 525/230 kV CAXIAS TR2 RS | RB | FT TR 525/230 kV CAXIAS TR2 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 9/21/2022 | 9/30/2052 | R$82,079.28 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CAXIAS | MC 525 kV TR 525/230 kV CAXIAS TR1 RS | RB | FT TR 525/230 kV CAXIAS TR1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$358,630.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS | MC 525 kV TR 525/230 kV CAXIAS TR1 RS | RB | FT TR 525/230 kV CAXIAS TR1 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 9/21/2022 | 9/30/2052 | R$82,079.28 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CAXIAS | MC 525 kV RTB 525 kV 150 Mvar CAXIAS RT2 RS | RB | FT RTB 525 kV 150 Mvar CAXIAS RT2 RS | 057/2001 | IPCA | RBNI | REA 8795/2020 | 5/8/2022 | 10/11/2050 | R$ 2,096,907.25 | 6/1/2025 | Ativa | T2020-029 | Instalar, na SE CAXIAS, um módulo de conexão com disjuntor, em 525kV, para o reator de barra RT2 525kV - 150 Mvar. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | CAXIAS | MC 525 kV RTB 525 kV 150 Mvar CAXIAS RT1 RS | RB | FT RTB 525 kV 150 Mvar CAXIAS RT1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$335,783.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS | MC 525 kV RTB 525 kV 150 Mvar CAXIAS RT1 RS | RB | FT RTB 525 kV 150 Mvar CAXIAS RT1 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 9/10/2022 | 1/21/2045 | R$116,560.62 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CAXIAS | MC 230 kV TR 525/230 kV CAXIAS TR3 RS | RB | FT TR 525/230 kV CAXIAS TR3 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS | MC 230 kV TR 525/230 kV CAXIAS TR2 RS | RB | FT TR 525/230 kV CAXIAS TR2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS | MC 230 kV TR 525/230 kV CAXIAS TR2 RS | RB | FT TR 525/230 kV CAXIAS TR2 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 7/17/2020 | 7/16/2044 | R$23,854.69 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CAXIAS | MC 230 kV TR 525/230 kV CAXIAS TR1 RS | RB | FT TR 525/230 kV CAXIAS TR1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS | IB 525 kV MG 525 kV CAXIAS MG1 RS IB5 | RB | FT MG 525 kV CAXIAS MG1 RS | 057/2001 | IPCA | RBNI | REA 8795/2020 | 5/8/2022 | 10/17/2052 | R$ 2,554,222.41 | 6/1/2025 | Ativa | T2020-029 | Instalar, na SE CAXIAS, uma interligação de barramentos IB5, em 525 kV, arranjo Disjuntor e Meio. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | CAXIAS | IB 525 kV MG 525 kV CAXIAS MG1 RS IB4 | RB | FT MG 525 kV CAXIAS MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS | IB 525 kV MG 525 kV CAXIAS MG1 RS IB4 | RB | FT MG 525 kV CAXIAS MG1 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 8/22/2022 | 8/30/2052 | R$72,033.01 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CAXIAS | IB 525 kV MG 525 kV CAXIAS MG1 RS IB3 | RB | FT MG 525 kV CAXIAS MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS | IB 525 kV MG 525 kV CAXIAS MG1 RS IB3 | RB | FT MG 525 kV CAXIAS MG1 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 9/29/2022 | 10/7/2052 | R$82,380.30 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CAXIAS | IB 525 kV MG 525 kV CAXIAS MG1 RS IB2 | RB | FT MG 525 kV CAXIAS MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS | IB 525 kV MG 525 kV CAXIAS MG1 RS IB2 | RB | FT MG 525 kV CAXIAS MG1 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 9/29/2022 | 10/11/2052 | R$55,185.12 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CAXIAS | IB 525 kV MG 525 kV CAXIAS MG1 RS IB2 | RB | FT MG 525 kV CAXIAS MG1 RS | 057/2001 | IPCA | RBNI | REA 8314/2019 | 9/30/2022 | 10/2/2052 | R$39,257.92 | 6/1/2025 | Ativa | Substituição de Transformador de Corrente 525kV referente ao Interligador de Barras, DJ1070, SE Caxias, Fase C. Associado à obra são esperadas substituições/adaptações de fundações e suportes, caixa de junção, cabos de controle/potência, barramento, conectores e conexão de aterramento.. Riscos de danos às instalações devido à perda de confiabilidade. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CAXIAS | IB 525 kV MG 525 kV CAXIAS MG1 RS IB1 | RB | FT MG 525 kV CAXIAS MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS | IB 525 kV MG 525 kV CAXIAS MG1 RS IB1 | RB | FT MG 525 kV CAXIAS MG1 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 8/22/2022 | 8/30/2052 | R$77,723.56 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CAXIAS | IB 230 kV MG 525 kV CAXIAS MG1 RS IB1 | RB | FT MG 525 kV CAXIAS MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,146.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS | EL 525 kV CAXIAS LT 525 kV CAXIAS /GRAVATAI C-1 RS | RB | FT LT 525 kV CAXIAS /GRAVATAI C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS | EL 525 kV CAXIAS LT 525 kV CAXIAS /GRAVATAI C-1 RS | RB | FT LT 525 kV CAXIAS /GRAVATAI C-1 RS | 057/2001 | IPCA | RBNI | REA 8314/2019 | 6/12/2019 | 6/11/2034 | R$181,890.95 | 6/1/2025 | Ativa | Substituição das proteções principal e alternada da LT 525 kV Caxias - Gravataí C1. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CAXIAS | EL 525 kV CAXIAS LT 525 kV CAXIAS /GRAVATAI C-1 RS | RB | FT LT 525 kV CAXIAS /GRAVATAI C-1 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 9/21/2022 | 9/30/2052 | R$54,820.72 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CAXIAS | EL 525 kV CAXIAS LT 525 kV CAXIAS /GRAVATAI C-1 RS | RB | FT LT 525 kV CAXIAS /GRAVATAI C-1 RS | 057/2001 | IPCA | RBNI | REA 7528/2018 | 9/21/2022 | 9/30/2052 | R$39,639.30 | 6/1/2025 | Ativa | Substituição de Transformador de Corrente 525 kV referente a LT Caxias - Gravataí C-1, DJ1052, Fase B. Associado à obra, são esperadas substituições/adaptações de fundações e suportes, caixa de junção, cabos de controle/potência, barramento, conectores e conexão de aterramento.. Riscos de danos às instalações devido à perda de confiabilidade. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CAXIAS | EL 500 kV CAXIAS LT 500 kV CAXIAS NORTE /CAXIAS C-2 RS | RB | FT LT 500 kV CAXIAS NORTE /CAXIAS C-2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS | EL 500 kV CAXIAS LT 500 kV CAXIAS NORTE /CAXIAS C-2 RS | RB | FT LT 500 kV CAXIAS NORTE /CAXIAS C-2 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 9/21/2022 | 9/30/2052 | R$81,504.61 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CAXIAS | EL 500 kV CAXIAS LT 500 kV CAXIAS NORTE /CAXIAS C-1 RS | RB | FT LT 500 kV CAXIAS NORTE /CAXIAS C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS | EL 500 kV CAXIAS LT 500 kV CAXIAS NORTE /CAXIAS C-1 RS | RB | FT LT 500 kV CAXIAS NORTE /CAXIAS C-1 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 9/21/2022 | 9/30/2052 | R$82,231.08 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CAXIAS | EL 230 kV CAXIAS LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS | RB | FT LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS | EL 230 kV CAXIAS LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS | RB | FT LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 10/31/2022 | 10/30/2037 | R$63,288.64 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CAXIAS NORTE | MG 525 kV CAXIAS NORTE MG2 RS | RB | FT MG 525 kV CAXIAS NORTE MG2 RS | 057/2001 | IPCA | RBNI | DSP 540/2025 | 11/1/2024 | 10/31/2042 | R$74,620.53 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura Geral de Acessante -MIG-A 500 kV na SE Caxias Norte, em função do seccionamento da LT 500 kV Itá - Caxias C1. | |||
| AXIA Energia Sul | CAXIAS NORTE | EL 500 kV CAXIAS NORTE LT 500 kV CAXIAS NORTE /ITA C-1 RS/SC | RB | FT LT 500 kV CAXIAS NORTE /ITA C-1 RS/SC | 057/2001 | IPCA | RBNI | DSP 540/2025 | 11/1/2024 | 10/31/2052 | R$263,458.82 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV, arranjo Disjuntor e Meio, na subestação Caxias Norte, associada à Linha de Transmissão 500 kV Itá – Caxias Norte C1. | |||
| AXIA Energia Sul | CAXIAS NORTE | EL 500 kV CAXIAS NORTE LT 500 kV CAXIAS NORTE /CAXIAS C-2 RS | RB | FT LT 500 kV CAXIAS NORTE /CAXIAS C-2 RS | 057/2001 | IPCA | RBNI | DSP 540/2025 | 11/1/2024 | 10/31/2052 | R$263,458.82 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV, arranjo Disjuntor e Meio, na subestação Caxias Norte, associada à Linha de Transmissão 500 kV Caxias Norte – Caxias C2. | |||
| AXIA Energia Sul | CAXIAS NORTE | EL 500 kV CAXIAS NORTE LT 500 kV CAXIAS NORTE /CAXIAS C-1 RS | RB | FT LT 500 kV CAXIAS NORTE /CAXIAS C-1 RS | 057/2001 | IPCA | RBNI | DSP 540/2025 | 1/13/2025 | 1/12/2053 | R$263,458.82 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV, arranjo Disjuntor e Meio, na subestação Caxias Norte, associada à Linha de Transmissão 500 kV Caxias Norte – Caxias C1. | |||
| AXIA Energia Sul | CAXIAS NORTE | EL 500 kV CAXIAS NORTE LT 500 kV C.NOVOS /CAXIAS NORTE C-1 SC/RS | RB | FT LT 500 kV C.NOVOS /CAXIAS NORTE C-1 SC/RS | 057/2001 | IPCA | RBNI | DSP 540/2025 | 1/13/2025 | 1/12/2053 | R$263,458.82 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV, arranjo Disjuntor e Meio, na subestação Caxias Norte, associada à Linha de Transmissão 500 kV Campos Novos – Caxias C1. | |||
| AXIA Energia Sul | CAXIAS SUL 5 | TR 230/69 kV CAXIAS SUL 5 TRR1 RS | RBF | FT TR 230/69 kV CAXIAS SUL 5 TRR1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$180,045.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS SUL 5 | TR 230/69 kV CAXIAS SUL 5 TR3 RS | RBF | FT TR 230/69 kV CAXIAS SUL 5 TR3 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$540,136.91 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS SUL 5 | TR 230/13,8 kV CAXIAS SUL 5 TR2 RS | RBF | FT TR 230/13,8 kV CAXIAS SUL 5 TR2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$213,881.11 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS SUL 5 | MG 230 kV CAXIAS SUL 5 MG1 RS | RB | FT MG 230 kV CAXIAS SUL 5 MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$476,999.07 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS SUL 5 | MG 230 kV CAXIAS SUL 5 MG1 RS | RB | FT MG 230 kV CAXIAS SUL 5 MG1 RS | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/15/2019 | 5/14/2036 | R$10,243.86 | 6/1/2025 | Ativa | Instalação de 2 carregadores de baterias de 48 Vcc * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CAXIAS SUL 5 | MG 230 kV CAXIAS SUL 5 MG1 RS | RB | FT MG 230 kV CAXIAS SUL 5 MG1 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 4/16/2021 | 4/29/2037 | R$100,151.44 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CAXIAS SUL 5 | MG 230 kV CAXIAS SUL 5 MG1 RS | RB | FT MG 230 kV CAXIAS SUL 5 MG1 RS | 057/2001 | IPCA | RBNI | REA 7761/2019 | 4/30/2019 | 4/29/2036 | R$19,604.58 | 6/1/2025 | Ativa | Substituição de Bateria BAT2. Perda da capacidade de carga. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CAXIAS SUL 5 | MC 69 kV TR 230/69 kV CAXIAS SUL 5 TR3 RS | RBF | FT TR 230/69 kV CAXIAS SUL 5 TR3 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$54,243.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS SUL 5 | MC 230 kV TR 230/69 kV CAXIAS SUL 5 TR3 RS | RBF | FT TR 230/69 kV CAXIAS SUL 5 TR3 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS SUL 5 | MC 230 kV TR 230/69 kV CAXIAS SUL 5 TR3 RS | RBF | FT TR 230/69 kV CAXIAS SUL 5 TR3 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 9/30/2020 | 9/29/2044 | R$20,381.75 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CAXIAS SUL 5 | MC 230 kV TR 230/13,8 kV CAXIAS SUL 5 TR2 RS | RBF | FT TR 230/13,8 kV CAXIAS SUL 5 TR2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 |
| Revenue Concessionaire | Edification | Module | Classification | Transmission Function | Revenue Contract | Index | Revenue Type | RAP Act | Start | End | 2025/2026 RAP Cycle | RAP Reference Date | RAP Situation | Project | Revenue Description | Quarter | Obs |
| AXIA Energia Sul | CAXIAS SUL 5 | MC 13,8 kV TR 230/13,8 kV CAXIAS SUL 5 TR2 RS | RBF | FT TR 230/13,8 kV CAXIAS SUL 5 TR2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$41,942.61 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS SUL 5 | MC 13,8 kV BC 13,8 kV 3,6 Mvar CAXIAS SUL 5 BC3 RS BC3/BC4 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,500.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAXIAS SUL 5 | MC 13,8 kV BC 13,8 kV 3,6 Mvar CAXIAS SUL 5 BC1 RS BC1/BC2 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,500.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAXIAS SUL 5 | IB 69 kV MG 230 kV CAXIAS SUL 5 MG1 RS IB2 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$36,457.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAXIAS SUL 5 | IB 230 kV MG 230 kV CAXIAS SUL 5 MG1 RS IB1 | RB | FT MG 230 kV CAXIAS SUL 5 MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,146.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS SUL 5 | IB 13,8 kV MG 230 kV CAXIAS SUL 5 MG1 RS IB4 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,558.90 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAXIAS SUL 5 | IB 13,8 kV MG 230 kV CAXIAS SUL 5 MG1 RS IB3 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,558.90 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAXIAS SUL 5 | EL 69 kV CAXIAS SUL 5 DIST3 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,414.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAXIAS SUL 5 | EL 69 kV CAXIAS SUL 5 DIST3 | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/31/2023 | 1/30/2047 | R$7,473.76 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | CAXIAS SUL 5 | EL 69 kV CAXIAS SUL 5 DIST2 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,414.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAXIAS SUL 5 | EL 69 kV CAXIAS SUL 5 DIST2 | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/31/2023 | 1/30/2047 | R$7,473.76 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | CAXIAS SUL 5 | EL 69 kV CAXIAS SUL 5 DIST1 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,414.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAXIAS SUL 5 | EL 230 kV CAXIAS SUL 5 LT 230 kV L.GRANDE /CAXIAS SUL 5 C-1 RS | RB | FT LT 230 kV L.GRANDE /CAXIAS SUL 5 C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS SUL 5 | EL 230 kV CAXIAS SUL 5 LT 230 kV L.GRANDE /CAXIAS SUL 5 C-1 RS | RB | FT LT 230 kV L.GRANDE /CAXIAS SUL 5 C-1 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/31/2023 | 1/30/2047 | R$24,232.86 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CAXIAS SUL 5 | EL 230 kV CAXIAS SUL 5 LT 230 kV CAXIAS NORTE /CAXIAS SUL 5 C-1 RS | RB | FT LT 230 kV CAXIAS NORTE /CAXIAS SUL 5 C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS SUL 5 | EL 230 kV CAXIAS SUL 5 LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS | RB | FT LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CAXIAS SUL 5 | EL 13,8 kV CAXIAS SUL 5 DIST9 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$45,495.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAXIAS SUL 5 | EL 13,8 kV CAXIAS SUL 5 DIST8 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$45,495.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAXIAS SUL 5 | EL 13,8 kV CAXIAS SUL 5 DIST7 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$45,495.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAXIAS SUL 5 | EL 13,8 kV CAXIAS SUL 5 DIST6 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$45,495.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAXIAS SUL 5 | EL 13,8 kV CAXIAS SUL 5 DIST5 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$45,495.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAXIAS SUL 5 | EL 13,8 kV CAXIAS SUL 5 DIST4 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$45,495.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAXIAS SUL 5 | EL 13,8 kV CAXIAS SUL 5 DIST10 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$45,495.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAXIAS SUL 5 | BC 13,8 kV 3,6 Mvar CAXIAS SUL 5 BC4 RS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,733.51 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAXIAS SUL 5 | BC 13,8 kV 3,6 Mvar CAXIAS SUL 5 BC4 RS | DIT | 057/2001 | IPCA | RMELP | DSP 791/2024 | R$333,042.39 | 6/1/2025 | Prevista | T2024-015 | Obra de Substituição Completa: Substituição de Banco de Capacitores BC4, 13,8 kV, 3,6 Mvar, na SE Caxias 5. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | |||||
| AXIA Energia Sul | CAXIAS SUL 5 | BC 13,8 kV 3,6 Mvar CAXIAS SUL 5 BC3 RS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,733.51 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAXIAS SUL 5 | BC 13,8 kV 3,6 Mvar CAXIAS SUL 5 BC3 RS | DIT | 057/2001 | IPCA | RMELP | DSP 791/2024 | R$333,042.39 | 6/1/2025 | Prevista | T2024-014 | Obra de Substituição Completa: Substituição de Banco de Capacitores BC3, 13,8 kV, 3,6 Mvar, na SE Caxias 5. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | |||||
| AXIA Energia Sul | CAXIAS SUL 5 | BC 13,8 kV 3,6 Mvar CAXIAS SUL 5 BC2 RS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,733.51 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAXIAS SUL 5 | BC 13,8 kV 3,6 Mvar CAXIAS SUL 5 BC2 RS | DIT | 057/2001 | IPCA | RMELP | DSP 791/2024 | R$333,042.39 | 6/1/2025 | Prevista | T2024-013 | Obra de Substituição Completa: Substituição de Banco de Capacitores BC2, 13,8 kV, 3,6 Mvar, na SE Caxias 5. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | |||||
| AXIA Energia Sul | CAXIAS SUL 5 | BC 13,8 kV 3,6 Mvar CAXIAS SUL 5 BC1 RS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,733.51 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CAXIAS SUL 5 | BC 13,8 kV 3,6 Mvar CAXIAS SUL 5 BC1 RS | DIT | 057/2001 | IPCA | RMELP | DSP 791/2024 | R$333,042.39 | 6/1/2025 | Prevista | T2024-012 | Obra de Substituição Completa: Substituição de Banco de Capacitores BC1, 13,8 kV, 3,6 Mvar, na SE Caxias 5. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | |||||
| AXIA Energia Sul | CAXIAS SUL 6 | TR 230/69 kV CAXIAS SUL 6 TRR1 RS | RBF | FT TR 230/69 kV CAXIAS SUL 6 TRR1 RS | 011/2010 | IPCA | RBL | CC 011/2010 | 4/17/2013 | 10/6/2040 | R$544,201.85 | 6/1/2025 | Ativa | T2010-078-A | Contrato de Concessão nº 011/2010SE Caxias 6 230/69kV - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Sul | CAXIAS SUL 6 | TR 230/69 kV CAXIAS SUL 6 TR2 RS | RBF | FT TR 230/69 kV CAXIAS SUL 6 TR2 RS | 011/2010 | IPCA | RBL | CC 011/2010 | 4/17/2013 | 10/6/2040 | R$ 1,632,605.55 | 6/1/2025 | Ativa | T2010-078-A | Contrato de Concessão nº 011/2010SE Caxias 6 230/69kV - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Sul | CAXIAS SUL 6 | TR 230/69 kV CAXIAS SUL 6 TR1 RS | RBF | FT TR 230/69 kV CAXIAS SUL 6 TR1 RS | 011/2010 | IPCA | RBL | CC 011/2010 | 4/17/2013 | 10/6/2040 | R$ 1,632,605.55 | 6/1/2025 | Ativa | T2010-078-A | Contrato de Concessão nº 011/2010SE Caxias 6 230/69kV - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Sul | CAXIAS SUL 6 | MG 230 kV CAXIAS SUL 6 MG1 RS | RB | FT MG 230 kV CAXIAS SUL 6 MG1 RS | 011/2010 | IPCA | RBL | CC 011/2010 | 4/17/2013 | 10/6/2040 | R$ 1,274,414.60 | 6/1/2025 | Ativa | T2010-078-A | Contrato de Concessão nº 011/2010SE Caxias 6 230/69kV - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Sul | CAXIAS SUL 6 | MG 230 kV CAXIAS SUL 6 MG1 RS | RB | FT MG 230 kV CAXIAS SUL 6 MG1 RS | 011/2010 | IPCA | RBNI | REN 1020/2022 | 10/22/2022 | 10/21/2053 | R$42,108.75 | 6/1/2025 | Ativa | MIM ASSOCIADO: Implantação de 01 (uma) Entrada de Linha 69 kV na SE Caxias 6 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2023 - 2024 | |||
| AXIA Energia Sul | CAXIAS SUL 6 | MG 230 kV CAXIAS SUL 6 MG1 RS | RB | FT MG 230 kV CAXIAS SUL 6 MG1 RS | 011/2010 | IPCA | RBNI | REN 1020/2022 | 10/22/2022 | 10/21/2053 | R$42,108.75 | 6/1/2025 | Ativa | MIM ASSOCIADO: Implantação de 01 (uma) Entrada de Linha 69 kV na SE Caxias 6 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2023 - 2024 | |||
| AXIA Energia Sul | CAXIAS SUL 6 | MC 69 kV TR 230/69 kV CAXIAS SUL 6 TR2 RS | RBF | FT TR 230/69 kV CAXIAS SUL 6 TR2 RS | 011/2010 | IPCA | RBL | CC 011/2010 | 4/17/2013 | 10/6/2040 | R$165,542.73 | 6/1/2025 | Ativa | T2010-078-A | Contrato de Concessão nº 011/2010SE Caxias 6 230/69kV - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Sul | CAXIAS SUL 6 | MC 69 kV TR 230/69 kV CAXIAS SUL 6 TR1 RS | RBF | FT TR 230/69 kV CAXIAS SUL 6 TR1 RS | 011/2010 | IPCA | RBL | CC 011/2010 | 4/17/2013 | 10/6/2040 | R$165,542.73 | 6/1/2025 | Ativa | T2010-078-A | Contrato de Concessão nº 011/2010SE Caxias 6 230/69kV - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Sul | CAXIAS SUL 6 | MC 230 kV TR 230/69 kV CAXIAS SUL 6 TR2 RS | RBF | FT TR 230/69 kV CAXIAS SUL 6 TR2 RS | 011/2010 | IPCA | RBL | CC 011/2010 | 4/17/2013 | 10/6/2040 | R$416,246.91 | 6/1/2025 | Ativa | T2010-078-A | Contrato de Concessão nº 011/2010SE Caxias 6 230/69kV - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Sul | CAXIAS SUL 6 | MC 230 kV TR 230/69 kV CAXIAS SUL 6 TR1 RS | RBF | FT TR 230/69 kV CAXIAS SUL 6 TR1 RS | 011/2010 | IPCA | RBL | CC 011/2010 | 4/17/2013 | 10/6/2040 | R$416,246.91 | 6/1/2025 | Ativa | T2010-078-A | Contrato de Concessão nº 011/2010SE Caxias 6 230/69kV - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Sul | CAXIAS SUL 6 | IB 69 kV MG 230 kV CAXIAS SUL 6 MG1 RS IB1 | DIT | 011/2010 | IPCA | RPEC | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$86,014.70 | 6/1/2025 | Ativa | T2010-078-A | Contrato de Concessão nº 011/2010SE Caxias 6 230/69kV - RPEC *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Sul | CAXIAS SUL 6 | IB 230 kV MG 230 kV CAXIAS SUL 6 MG1 RS IB1 | RB | FT MG 230 kV CAXIAS SUL 6 MG1 RS | 011/2010 | IPCA | RBL | CC 011/2010 | 4/17/2013 | 10/6/2040 | R$307,275.35 | 6/1/2025 | Ativa | T2010-078-A | Contrato de Concessão nº 011/2010SE Caxias 6 230/69kV - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Sul | CAXIAS SUL 6 | EL 69 kV CAXIAS SUL 6 DIST4 | DIT | 011/2010 | IPCA | RCDM | REN 1020/2022 | 10/22/2022 | 10/21/2050 | R$574,399.94 | 6/1/2025 | Ativa | Implantação de 01 (uma) Entrada de Linha 69 kV na SE Caxias 6 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2023 - 2024 | ||||
| AXIA Energia Sul | CAXIAS SUL 6 | EL 69 kV CAXIAS SUL 6 DIST3 | DIT | 011/2010 | IPCA | RCDM | REN 1020/2022 | 10/22/2022 | 10/21/2050 | R$574,399.94 | 6/1/2025 | Ativa | Implantação de 01 (uma) Entrada de Linha 69 kV na SE Caxias 6 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2023 - 2024 | ||||
| AXIA Energia Sul | CAXIAS SUL 6 | EL 69 kV CAXIAS SUL 6 DIST2 | DIT | 011/2010 | IPCA | RPEC | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$150,505.78 | 6/1/2025 | Ativa | T2010-078-A | Contrato de Concessão nº 011/2010SE Caxias 6 230/69kV - RPEC *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Sul | CAXIAS SUL 6 | EL 69 kV CAXIAS SUL 6 DIST1 | DIT | 011/2010 | IPCA | RPEC | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$150,505.78 | 6/1/2025 | Ativa | T2010-078-A | Contrato de Concessão nº 011/2010SE Caxias 6 230/69kV - RPEC *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | CEARA MIRIM II | TR 500/230 kV CEARA MIRIM II TRR1 RN | RB | FT TR 500/230 kV CEARA MIRIM II TRR1 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$860,121.79 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | CEARA MIRIM II | TR 500/230 kV CEARA MIRIM II TR2 RN | RB | FT TR 500/230 kV CEARA MIRIM II TR2 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$ 2,580,366.50 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | CEARA MIRIM II | TR 500/230 kV CEARA MIRIM II TR1 RN | RB | FT TR 500/230 kV CEARA MIRIM II TR1 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$ 2,580,366.50 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | CEARA MIRIM II | RTL 500 kV 33,33 Mvar CEARA MIRIM II RTR2 RN | RB | FT RTL 500 kV 33,33 Mvar CEARA MIRIM II RTR2 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$342,950.44 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | CEARA MIRIM II | RTL 500 kV 100 Mvar CEARA MIRIM II RTL2 RN | RB | FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$ 1,028,852.46 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | CEARA MIRIM II | RTB 500 kV 50 Mvar CEARA MIRIM II RTR1 RN | RB | FT RTB 500 kV 50 Mvar CEARA MIRIM II RTR1 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$393,364.48 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | CEARA MIRIM II | RTB 500 kV 150 Mvar CEARA MIRIM II RTB1 RN | RB | FT RTB 500 kV 150 Mvar CEARA MIRIM II RTB1 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$ 1,180,093.45 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | CEARA MIRIM II | MG 500 kV CEARA MIRIM II MG1 RN | RB | FT MG 500 kV CEARA MIRIM II MG1 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$ 1,188,991.65 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | CEARA MIRIM II | MG 500 kV CEARA MIRIM II MG1 RN | RB | FT MG 500 kV CEARA MIRIM II MG1 RN | 008/2011 | IPCA | RBNI | REA 7761/2019 | 7/28/2020 | 7/27/2035 | R$30,139.42 | 6/1/2025 | Ativa | Implantação de Sistema para acesso remoto a dispositivos de Proteção, Controle e Automação. Sistema composto de Painel com PCs Industriais (Concentrador e Firewall), Receptor GPS, Switch Gerenciável. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 | |||
| AXIA Energia Nordeste | CEARA MIRIM II | MG 230 kV CEARA MIRIM II MG4 RN | RB | FT MG 230 kV CEARA MIRIM II MG4 RN | 019/2010 | IPCA | RBNI | DSP 1169/2022 | 9/17/2014 | 11/22/2040 | R$45,256.24 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 2 Módulo de Infraestrutura de Manobra em 230 kV, arranjo barra dupla com quatro chaves, na Subestação Ceará Mirim, associado as Entradas de Linha para João Câmara II e Extremoz II. | |||
| AXIA Energia Nordeste | CEARA MIRIM II | MC 500 kV TR 500/230 kV CEARA MIRIM II TR2 RN | RB | FT TR 500/230 kV CEARA MIRIM II TR2 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$627,283.87 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | CEARA MIRIM II | MC 500 kV TR 500/230 kV CEARA MIRIM II TR1 RN | RB | FT TR 500/230 kV CEARA MIRIM II TR1 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$627,283.87 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | CEARA MIRIM II | MC 500 kV RTL 500 kV 100 Mvar CEARA MIRIM II RTL2 RN | RB | FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$375,557.86 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | CEARA MIRIM II | MC 500 kV RTB 500 kV 150 Mvar CEARA MIRIM II RTB1 RN | RB | FT RTB 500 kV 150 Mvar CEARA MIRIM II RTB1 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$586,206.52 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | CEARA MIRIM II | MC 230 kV TR 500/230 kV CEARA MIRIM II TR2 RN | RB | FT TR 500/230 kV CEARA MIRIM II TR2 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$230,553.45 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | CEARA MIRIM II | MC 230 kV TR 500/230 kV CEARA MIRIM II TR1 RN | RB | FT TR 500/230 kV CEARA MIRIM II TR1 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$230,553.45 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | CEARA MIRIM II | MC 230 kV CE 150/-75 Mvar CEARA MIRIM II CE1 RN | RB | FT CE 150/-75 Mvar CEARA MIRIM II CE1 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$234,753.20 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | CEARA MIRIM II | IB 500 kV MG 500 kV CEARA MIRIM II MG1 RN IB3 | RB | FT MG 500 kV CEARA MIRIM II MG1 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$670,964.90 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | CEARA MIRIM II | IB 500 kV MG 500 kV CEARA MIRIM II MG1 RN IB2 | RB | FT MG 500 kV CEARA MIRIM II MG1 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$670,964.90 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | CEARA MIRIM II | IB 500 kV MG 500 kV CEARA MIRIM II MG1 RN IB1 | RB | FT MG 500 kV CEARA MIRIM II MG1 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$670,964.90 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | CEARA MIRIM II | IB 230 kV MG 500 kV CEARA MIRIM II MG1 RN IB1 | RB | FT MG 500 kV CEARA MIRIM II MG1 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$174,707.11 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | CEARA MIRIM II | EL 500 kV CEARA MIRIM II LT 500 kV JOAO CAMARA III /CEARA MIRIM II C-1 RN | RB | FT LT 500 kV JOAO CAMARA III /CEARA MIRIM II C-1 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$703,441.68 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | CEARA MIRIM II | EL 500 kV CEARA MIRIM II LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB | RB | FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB | 008/2011 | IPCA | RBL | CC 008/2011 | 5/13/2015 | 10/13/2041 | R$703,441.69 | 6/1/2025 | Ativa | T2011-180-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | CEARA MIRIM II | EL 230 kV CEARA MIRIM II LT 230 kV TOUROS /CEARA MIRIM II C-1 RN | RB | FT LT 230 kV TOUROS /CEARA MIRIM II C-1 RN | 018/2012 | IPCA | RBL | CC 018/2012 | 5/12/2017 | 6/1/2042 | R$611,676.75 | 6/1/2025 | Ativa | T2012-114-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | CEARA MIRIM II | EL 230 kV CEARA MIRIM II LT 230 kV CEARA MIRIM II /JOAO CAMARA II C-1 RN | RB | FT LT 230 kV CEARA MIRIM II /JOAO CAMARA II C-1 RN | 019/2010 | IPCA | RBNI | DSP 1169/2022 | 9/17/2014 | 11/22/2040 | R$229,029.93 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo barra dupla com quatro chaves, na Subestação Ceará Mirim II, associada à linha de transmissão 230 kV João Câmara II – Ceará Mirim II. | |||
| AXIA Energia Nordeste | CEARA MIRIM II | EL 230 kV CEARA MIRIM II LT 230 kV CEARA MIRIM II /EXTREMOZ II C-2 RN | RB | FT LT 230 kV CEARA MIRIM II /EXTREMOZ II C-2 RN | 019/2010 | IPCA | RBNI | DSP 1169/2022 | 9/17/2014 | 11/22/2040 | R$229,029.93 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Ceará Mirim II, associada à Linha de Transmissão 230 kV Ceará Mirim II – Extremoz II. | |||
| AXIA Energia Nordeste | CEARA MIRIM II | EL 230 kV CEARA MIRIM II LT 230 kV CEARA MIRIM II /EXTREMOZ II C-1 RN | RB | FT LT 230 kV CEARA MIRIM II /EXTREMOZ II C-1 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$323,671.58 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | CEARA MIRIM II | CE 150/-75 Mvar CEARA MIRIM II CE1 RN | RB | FT CE 150/-75 Mvar CEARA MIRIM II CE1 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$ 4,094,321.35 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| Nova Era Integração | CHAPADA III | EL 230 kV CHAPADA III LT 230 kV CHAPADA III /CRATO II C-1 PI/CE | RB | FT LT 230 kV CHAPADA III /CRATO II C-1 PI/CE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,599,662.58 | 6/1/2025 | Prevista | T2024-197-D | LT 230 kV Chapada III - Crato II - C1 | ||||
| Nova Era Catarina | CHAPECOENSE | TR 230/138 kV CHAPECOENSE TR2 SC | RBF | FT TR 230/138 kV CHAPECOENSE TR2 SC | 012/2024 | IPCA | RBL | CC 012/2024 | R$ 1,036,372.96 | 6/1/2025 | Prevista | T2024-201 | - SE 230/138 kV Chapecoense (Pátios de 230 e Transformação 230/138 kV)- Seccionamentos das LTs 230 kV Foz do Chapecó – Xanxerê – C1 e C2 na subestação Chapecoense | ||||
| Nova Era Catarina | CHAPECOENSE | TR 230/138 kV CHAPECOENSE TR1 SC | RBF | FT TR 230/138 kV CHAPECOENSE TR1 SC | 012/2024 | IPCA | RBL | CC 012/2024 | R$ 1,036,372.96 | 6/1/2025 | Prevista | T2024-201 | - SE 230/138 kV Chapecoense (Pátios de 230 e Transformação 230/138 kV)- Seccionamentos das LTs 230 kV Foz do Chapecó – Xanxerê – C1 e C2 na subestação Chapecoense | ||||
| Nova Era Catarina | CHAPECOENSE | MG 230 kV CHAPECOENSE MG1 SC | RB | FT MG 230 kV CHAPECOENSE MG1 SC | 012/2024 | IPCA | RBL | CC 012/2024 | R$ 1,560,483.88 | 6/1/2025 | Prevista | T2024-201 | - SE 230/138 kV Chapecoense (Pátios de 230 e Transformação 230/138 kV)- Seccionamentos das LTs 230 kV Foz do Chapecó – Xanxerê – C1 e C2 na subestação Chapecoense | ||||
| Nova Era Catarina | CHAPECOENSE | MC 230 kV TR 230/138 kV CHAPECOENSE TR2 SC | RBF | FT TR 230/138 kV CHAPECOENSE TR2 SC | 012/2024 | IPCA | RBL | CC 012/2024 | R$567,886.70 | 6/1/2025 | Prevista | T2024-201 | - SE 230/138 kV Chapecoense (Pátios de 230 e Transformação 230/138 kV)- Seccionamentos das LTs 230 kV Foz do Chapecó – Xanxerê – C1 e C2 na subestação Chapecoense | ||||
| Nova Era Catarina | CHAPECOENSE | MC 230 kV TR 230/138 kV CHAPECOENSE TR1 SC | RBF | FT TR 230/138 kV CHAPECOENSE TR1 SC | 012/2024 | IPCA | RBL | CC 012/2024 | R$567,886.70 | 6/1/2025 | Prevista | T2024-201 | - SE 230/138 kV Chapecoense (Pátios de 230 e Transformação 230/138 kV)- Seccionamentos das LTs 230 kV Foz do Chapecó – Xanxerê – C1 e C2 na subestação Chapecoense | ||||
| Nova Era Catarina | CHAPECOENSE | MC 138 kV TR 230/138 kV CHAPECOENSE TR2 SC | RBF | FT TR 230/138 kV CHAPECOENSE TR2 SC | 012/2024 | IPCA | RBL | CC 012/2024 | R$421,149.01 | 6/1/2025 | Prevista | T2024-201 | - SE 230/138 kV Chapecoense (Pátios de 230 e Transformação 230/138 kV)- Seccionamentos das LTs 230 kV Foz do Chapecó – Xanxerê – C1 e C2 na subestação Chapecoense | ||||
| Nova Era Catarina | CHAPECOENSE | MC 138 kV TR 230/138 kV CHAPECOENSE TR1 SC | RBF | FT TR 230/138 kV CHAPECOENSE TR1 SC | 012/2024 | IPCA | RBL | CC 012/2024 | R$421,149.01 | 6/1/2025 | Prevista | T2024-201 | - SE 230/138 kV Chapecoense (Pátios de 230 e Transformação 230/138 kV)- Seccionamentos das LTs 230 kV Foz do Chapecó – Xanxerê – C1 e C2 na subestação Chapecoense | ||||
| Nova Era Catarina | CHAPECOENSE | IB 230 kV MG 230 kV CHAPECOENSE MG1 SC IB1 | RB | FT MG 230 kV CHAPECOENSE MG1 SC | 012/2024 | IPCA | RBL | CC 012/2024 | R$433,981.54 | 6/1/2025 | Prevista | T2024-201 | - SE 230/138 kV Chapecoense (Pátios de 230 e Transformação 230/138 kV)- Seccionamentos das LTs 230 kV Foz do Chapecó – Xanxerê – C1 e C2 na subestação Chapecoense | ||||
| Nova Era Catarina | CHAPECOENSE | IB 138 kV MG 230 kV CHAPECOENSE MG1 SC IB1 | DIT | 012/2024 | IPCA | RPEC | CC 012/2024 | R$631,203.28 | 6/1/2025 | Prevista | T2024-201 | SE 230/138 kV Chapecoense (Pátio em 138 kV) – DIT. | |||||
| Nova Era Catarina | CHAPECOENSE | EL 230 kV CHAPECOENSE LT 230 kV FOZ DO CHAPECO /CHAPECOENSE C-2 RS/SC | RB | FT LT 230 kV FOZ DO CHAPECO /CHAPECOENSE C-2 RS/SC | 012/2024 | IPCA | RBL | CC 012/2024 | R$614,416.15 | 6/1/2025 | Prevista | T2024-201 | - SE 230/138 kV Chapecoense (Pátios de 230 e Transformação 230/138 kV)- Seccionamentos das LTs 230 kV Foz do Chapecó – Xanxerê – C1 e C2 na subestação Chapecoense | ||||
| Nova Era Catarina | CHAPECOENSE | EL 230 kV CHAPECOENSE LT 230 kV FOZ DO CHAPECO /CHAPECOENSE C-1 RS/SC | RB | FT LT 230 kV FOZ DO CHAPECO /CHAPECOENSE C-1 RS/SC | 012/2024 | IPCA | RBL | CC 012/2024 | R$614,416.15 | 6/1/2025 | Prevista | T2024-201 | - SE 230/138 kV Chapecoense (Pátios de 230 e Transformação 230/138 kV)- Seccionamentos das LTs 230 kV Foz do Chapecó – Xanxerê – C1 e C2 na subestação Chapecoense | ||||
| Nova Era Catarina | CHAPECOENSE | EL 230 kV CHAPECOENSE LT 230 kV CHAPECOENSE /XANXERE ESU C-2 SC | RB | FT LT 230 kV CHAPECOENSE /XANXERE ESU C-2 SC | 012/2024 | IPCA | RBL | CC 012/2024 | R$614,416.15 | 6/1/2025 | Prevista | T2024-201 | - SE 230/138 kV Chapecoense (Pátios de 230 e Transformação 230/138 kV)- Seccionamentos das LTs 230 kV Foz do Chapecó – Xanxerê – C1 e C2 na subestação Chapecoense | ||||
| Nova Era Catarina | CHAPECOENSE | EL 230 kV CHAPECOENSE LT 230 kV CHAPECOENSE /XANXERE ESU C-1 SC | RB | FT LT 230 kV CHAPECOENSE /XANXERE ESU C-1 SC | 012/2024 | IPCA | RBL | CC 012/2024 | R$614,416.15 | 6/1/2025 | Prevista | T2024-201 | - SE 230/138 kV Chapecoense (Pátios de 230 e Transformação 230/138 kV)- Seccionamentos das LTs 230 kV Foz do Chapecó – Xanxerê – C1 e C2 na subestação Chapecoense | ||||
| Nova Era Catarina | CHAPECOENSE | EL 138 kV CHAPECOENSE DIST2 | DIT | 012/2024 | IPCA | RPEC | CC 012/2024 | R$880,435.04 | 6/1/2025 | Prevista | T2024-201 | SE 230/138 kV Chapecoense (Pátio em 138 kV) – DIT. | |||||
| Nova Era Catarina | CHAPECOENSE | EL 138 kV CHAPECOENSE DIST1 | DIT | 012/2024 | IPCA | RPEC | CC 012/2024 | R$880,435.04 | 6/1/2025 | Prevista | T2024-201 | SE 230/138 kV Chapecoense (Pátio em 138 kV) – DIT. | |||||
| AXIA Energia Sul | CHARQUEADAS | TR 230/69 kV CHARQUEADAS TR5 RS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$288,756.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CHARQUEADAS | MG 230 kV CHARQUEADAS MG1 RS | RB | FT MG 230 kV CHARQUEADAS MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$473,889.82 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CHARQUEADAS | MG 230 kV CHARQUEADAS MG1 RS | RB | FT MG 230 kV CHARQUEADAS MG1 RS | 057/2001 | IPCA | RMEL | REN 643/2014 | 5/30/2014 | 5/29/2031 | R$9,238.63 | 6/1/2025 | Ativa | Substituição de 1 bateria 48 Vcc Bateria BA2300153. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CHARQUEADAS | MG 230 kV CHARQUEADAS MG1 RS | RB | FT MG 230 kV CHARQUEADAS MG1 RS | 057/2001 | IPCA | RMEL | REN 643/2014 | 11/6/2014 | 11/5/2031 | R$9,501.18 | 6/1/2025 | Ativa | Substituição de 1 baterias 125 Vcc. (primeira de duas) Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CHARQUEADAS | MG 230 kV CHARQUEADAS MG1 RS | RB | FT MG 230 kV CHARQUEADAS MG1 RS | 057/2001 | IPCA | RMEL | REN 643/2014 | 9/12/2014 | 9/11/2031 | R$9,410.92 | 6/1/2025 | Ativa | Substituição de 1 baterias 125 Vcc. (segunda de duas) Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CHARQUEADAS | MG 230 kV CHARQUEADAS MG1 RS | RB | FT MG 230 kV CHARQUEADAS MG1 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/24/2023 | 12/4/2039 | R$62,693.03 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CHARQUEADAS | MC 69 kV TR 230/69 kV CHARQUEADAS TR5 RS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$54,243.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CHARQUEADAS | MC 230 kV TR 230/69 kV CHARQUEADAS TR5 RS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$118,658.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CHARQUEADAS | MC 230 kV TR 230/69 kV CHARQUEADAS TR5 RS | DIT | 057/2001 | IPCA | RMEL | REN 643/2014 | 12/18/2013 | 12/17/2037 | R$17,487.45 | 6/1/2025 | Ativa | Substituição dos para-raios de 192kV do TF5.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | CHARQUEADAS | IB 69 kV MG 230 kV CHARQUEADAS MG1 RS IB2 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$36,457.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CHARQUEADAS | IB 69 kV MG 230 kV CHARQUEADAS MG1 RS IB2 | DIT | 057/2001 | IPCA | RMEL | REN 643/2014 | 7/28/2014 | 7/30/2044 | R$6,881.55 | 6/1/2025 | Ativa | Substituição de 10 seccionadoras 69kV: 441, 445, 451, 453, 455, 465, 471, 491, 493 e 495. CHAVES SUBSTITUIDAS NO MÓDULO: 471 Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | CHARQUEADAS | IB 69 kV MG 230 kV CHARQUEADAS MG1 RS IB2 | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 7/12/2019 | 3/8/2051 | R$81,046.65 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | CHARQUEADAS | IB 69 kV MG 230 kV CHARQUEADAS MG1 RS IB1 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$36,457.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CHARQUEADAS | IB 230 kV MG 230 kV CHARQUEADAS MG1 RS IB1 | RB | FT MG 230 kV CHARQUEADAS MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,146.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CHARQUEADAS | EL 69 kV CHARQUEADAS LT 69 kV UTE SAO JERONIMO /CHARQUEADAS C-1 RS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,414.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CHARQUEADAS | EL 69 kV CHARQUEADAS LT 69 kV TAQUARI /CHARQUEADAS C-1 RS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,414.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CHARQUEADAS | EL 69 kV CHARQUEADAS LT 69 kV GUAIBA /CHARQUEADAS C-1 RS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,414.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CHARQUEADAS | EL 69 kV CHARQUEADAS LT 69 kV GUAIBA /CHARQUEADAS C-1 RS | DIT | 057/2001 | IPCA | RMEL | REN 643/2014 | 7/28/2014 | 7/30/2044 | R$20,644.66 | 6/1/2025 | Ativa | Substituição de 10 seccionadoras 69kV: 441, 445, 451, 453, 455, 465, 471, 491, 493 e 495. CHAVES SUBSTITUIDAS NO MÓDULO: 491, 493, 495. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | CHARQUEADAS | EL 69 kV CHARQUEADAS LT 69 kV GUAIBA /CHARQUEADAS C-1 RS | DIT | 057/2001 | IPCA | RMEL | REN 643/2014 | 10/11/2014 | 10/10/2047 | R$39,264.77 | 6/1/2025 | Ativa | Substituição do DJ 492 69 kV. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | CHARQUEADAS | EL 69 kV CHARQUEADAS LT 69 kV CHARQUEADAS 2 /CHARQUEADAS C-1 RS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,414.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CHARQUEADAS | EL 69 kV CHARQUEADAS LT 69 kV CHARQUEADAS 2 /CHARQUEADAS C-1 RS | DIT | 057/2001 | IPCA | RMEL | REN 643/2014 | 11/26/2015 | 11/28/2045 | R$7,200.15 | 6/1/2025 | Ativa | Substituição de 10 seccionadoras 69kV: 441, 445, 451, 453, 455, 465, 471, 491, 493 e 495. CHAVES SUBSTITUIDAS NO MÓDULO: 465. Melhoria incluída no reajuste do ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | CHARQUEADAS | EL 69 kV CHARQUEADAS LT 69 kV CHARQUEADAS 2 /CHARQUEADAS C-1 RS | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$111,297.03 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CHARQUEADAS | EL 69 kV CHARQUEADAS LT 69 kV CHARQUEADAS 2 /CHARQUEADAS C-1 RS | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 5/16/2016 | 11/24/2044 | R$47,969.25 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | CHARQUEADAS | EL 69 kV CHARQUEADAS LT 69 kV ACOS FINOS PI /CHARQUEADAS C-2 RS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,414.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CHARQUEADAS | EL 69 kV CHARQUEADAS LT 69 kV ACOS FINOS PI /CHARQUEADAS C-2 RS | DIT | 057/2001 | IPCA | RMEL | REN 643/2014 | 12/10/2015 | 12/12/2045 | R$7,209.32 | 6/1/2025 | Ativa | Substituição de 10 seccionadoras 69kV: 441, 445, 451, 453, 455, 465, 471, 491, 493 e 495. CHAVES SUBSTITUIDAS NO MÓDULO: 451. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | CHARQUEADAS | EL 69 kV CHARQUEADAS LT 69 kV ACOS FINOS PI /CHARQUEADAS C-2 RS | DIT | 057/2001 | IPCA | RMEL | REN 643/2014 | 7/28/2014 | 7/30/2044 | R$13,763.12 | 6/1/2025 | Ativa | Substituição de 10 seccionadoras 69kV: 441, 445, 451, 453, 455, 465, 471, 491, 493 e 495. CHAVES SUBSTITUIDAS NO MÓDULO: 453 e 455. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | CHARQUEADAS | EL 69 kV CHARQUEADAS LT 69 kV ACOS FINOS PI /CHARQUEADAS C-2 RS | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 6/30/2019 | 6/29/2043 | R$9,257.60 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | CHARQUEADAS | EL 69 kV CHARQUEADAS LT 69 kV ACOS FINOS PI /CHARQUEADAS C-1 RS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,414.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | CHARQUEADAS | EL 69 kV CHARQUEADAS LT 69 kV ACOS FINOS PI /CHARQUEADAS C-1 RS | DIT | 057/2001 | IPCA | RMEL | REN 643/2014 | 12/10/2015 | 12/12/2045 | R$14,418.64 | 6/1/2025 | Ativa | Substituição de 10 seccionadoras 69kV: 441, 445, 451, 453, 455, 465, 471, 491, 493 e 495. CHAVES SUBSTITUIDAS NO MÓDULO : 441 e 445. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | CHARQUEADAS | EL 69 kV CHARQUEADAS LT 69 kV ACOS FINOS PI /CHARQUEADAS C-1 RS | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 6/30/2019 | 6/29/2043 | R$9,257.60 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | CHARQUEADAS | EL 230 kV CHARQUEADAS LT 230 kV SCHARLAU /CHARQUEADAS C-1 RS | RB | FT LT 230 kV SCHARLAU /CHARQUEADAS C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$195,444.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CHARQUEADAS | EL 230 kV CHARQUEADAS LT 230 kV CHARQUEADAS 3 /CHARQUEADAS C-2 RS | RB | FT LT 230 kV CHARQUEADAS 3 /CHARQUEADAS C-2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$195,444.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CHARQUEADAS | EL 230 kV CHARQUEADAS LT 230 kV CHARQUEADAS 3 /CHARQUEADAS C-2 RS | RB | FT LT 230 kV CHARQUEADAS 3 /CHARQUEADAS C-2 RS | 057/2001 | IPCA | RMEL | REN 443/2011 | 3/16/2013 | 3/15/2037 | R$16,885.21 | 6/1/2025 | Ativa | Substituição dos para-raios de SiC por ZnO do circuito Cidade Industrial * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019. Receita alterada no recurso contra a REH 2.407/2018. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CHARQUEADAS | EL 230 kV CHARQUEADAS LT 230 kV CHARQUEADAS 3 /CHARQUEADAS C-2 RS | RB | FT LT 230 kV CHARQUEADAS 3 /CHARQUEADAS C-2 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 6/19/2019 | 6/21/2049 | R$23,477.58 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CHARQUEADAS | EL 230 kV CHARQUEADAS LT 230 kV CHARQUEADAS 3 /CHARQUEADAS C-1 RS | RB | FT LT 230 kV CHARQUEADAS 3 /CHARQUEADAS C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$195,444.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CIC. DANTAS | TT 69/13,8 kV CIC. DANTAS TA1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CIC. DANTAS | TT 69/13,8 kV CIC. DANTAS TA1 BA | DIT | 061/2001 | IPCA | RCDM | REA 2837/2011 | 12/20/2012 | 12/23/2042 | R$145,207.18 | 6/1/2025 | Ativa | Substituição do atual transformador de aterramento de 93 Ohms/fase por um não superior a 40 Ohms/fase. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | CIC. DANTAS | TR 69/13,8 kV CIC. DANTAS TR3 BA | RB | FT MG 230 kV CIC. DANTAS MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CIC. DANTAS | TR 69/13,8 kV CIC. DANTAS TR3 BA | RB | FT MG 230 kV CIC. DANTAS MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$76,466.27 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CIC. DANTAS | TR 69/13,8 kV CIC. DANTAS TR3 BA | RB | FT MG 230 kV CIC. DANTAS MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$70,492.55 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CIC. DANTAS | TR 230/69 kV CIC. DANTAS TR5 BA | RBF | FT TR 230/69 kV CIC. DANTAS TR5 BA | 061/2001 | IPCA | RBNI | REA 2823/2011 | 12/30/2012 | 8/6/2047 | R$ 1,058,644.17 | 6/1/2025 | Ativa | T2009-121 | Obra de Substituição Completa - Substituir, na SE Cícero Dantas, os dois transformadores 230/69 kV, de 16,7 MVA, cada, por um transformador trifásico 230/69 kV, de 50 MVA. RAP corrigida de modo a considerar a Receita autorizada total do equipamento novo. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CIC. DANTAS | TR 230/69 kV CIC. DANTAS TR4 BA | RBF | FT TR 230/69 kV CIC. DANTAS TR4 BA | 061/2001 | IPCA | RBNI | REA 5211/2015 | 3/17/2018 | 4/19/2052 | R$ 1,509,056.37 | 6/1/2025 | Ativa | T2015-019 | Instalação, na Subestação Cícero Dantas, do terceiro transformador trifásico 230/69 kV, de 50 MVA. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CIC. DANTAS | TR 230/69 kV CIC. DANTAS TR3 BA | RBF | FT TR 230/69 kV CIC. DANTAS TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$247,202.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CIC. DANTAS | RTS 69 kV 40 Mvar CIC. DANTAS RT1 BA | RBF | FT TR 230/69 kV CIC. DANTAS TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$180,158.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CIC. DANTAS | MG 230 kV CIC. DANTAS MG1 BA | RB | FT MG 230 kV CIC. DANTAS MG1 BA | 061/2001 | IPCA | RBNI | REA 2823/2011 | 12/30/2012 | 5/11/2043 | R$23,616.45 | 6/1/2025 | Ativa | T2009-121 | Complemento, na SE Cícero Dantas, de infraestrutura de módulo geral pela substituição dos dois transformadores 230/69 kV, de 16,7 MVA, cada, por um transformador trifásico 230/69 kV, de 50 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CIC. DANTAS | MG 230 kV CIC. DANTAS MG1 BA | RB | FT MG 230 kV CIC. DANTAS MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$505,889.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CIC. DANTAS | MG 230 kV CIC. DANTAS MG1 BA | RB | FT MG 230 kV CIC. DANTAS MG1 BA | 061/2001 | IPCA | RBNI | REA 5211/2015 | 3/17/2018 | 11/26/2046 | R$268,683.72 | 6/1/2025 | Ativa | T2015-019 | Complementação do módulo geral da subestação Cícero Dantas com um módulo de infraestrutura de manobra em 230 kV e um módulo de infraestrutura de manobra em 69 kV. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CIC. DANTAS | MG 230 kV CIC. DANTAS MG1 BA | RB | FT MG 230 kV CIC. DANTAS MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/25/2015 | 11/24/2032 | R$26,899.56 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição das Bateriais Saturnia 60PZS400 250Vcc, Posições 900A1 e 900A2 .Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CIC. DANTAS | MG 230 kV CIC. DANTAS MG1 BA | RB | FT MG 230 kV CIC. DANTAS MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,419,611.52 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CIC. DANTAS | MG 230 kV CIC. DANTAS MG1 BA | RB | FT MG 230 kV CIC. DANTAS MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,308,708.37 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CIC. DANTAS | MG 230 kV CIC. DANTAS MG1 BA | RB | FT MG 230 kV CIC. DANTAS MG1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 9/22/2016 | 1/13/2050 | R$9,945.23 | 6/1/2025 | Ativa | Revitalização Necessária: Implantação de Switches Industriais * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CIC. DANTAS | MG 230 kV CIC. DANTAS MG1 BA | RB | FT MG 230 kV CIC. DANTAS MG1 BA | 061/2001 | IPCA | RBNI | REN 905/2020 | 3/9/2023 | 3/8/2054 | R$51,399.30 | 6/1/2025 | Ativa | MIM ASSOCIADO: Implantação de um módulo de Entrada de Linha em 69kV, arranjo barra principal e transferência, com destino à SE Cícero Dantas III na SE CÍCERO DANTAS * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2023 - 2024 | |||
| AXIA Energia Nordeste | CIC. DANTAS | MG 230 kV CIC. DANTAS MG1 BA | RB | FT MG 230 kV CIC. DANTAS MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/24/2021 | 7/23/2039 | R$306,701.98 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CIC. DANTAS | MC 69 kV TT 69/13,8 kV CIC. DANTAS TA1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CIC. DANTAS | MC 69 kV TR 69/13,8 kV CIC. DANTAS TR3 BA | RB | FT MG 230 kV CIC. DANTAS MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CIC. DANTAS | MC 69 kV TR 230/69 kV CIC. DANTAS TR5 BA | RBF | FT TR 230/69 kV CIC. DANTAS TR5 BA | 061/2001 | IPCA | RBNI | REA 2823/2011 | 12/30/2012 | 10/29/2044 | R$170,440.69 | 6/1/2025 | Ativa | T2009-121 | Instalar, na SE Cícero Dantas, o módulo de conexão 69 kV, arranjo barra principal e transferência, para o transformador trifásico 230/69 kV, de 50 MVA, por meio da retirada do módulo de conexão 69 kV do transformador 04T2 230/69 kV, de 16,7 MVA e adequação do módulo de conexão 69 kV do transformador 04T1 230/69 kV, de 16,7 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CIC. DANTAS | MC 69 kV TR 230/69 kV CIC. DANTAS TR4 BA | RBF | FT TR 230/69 kV CIC. DANTAS TR4 BA | 061/2001 | IPCA | RBNI | REA 5211/2015 | 3/17/2018 | 5/29/2047 | R$532,606.06 | 6/1/2025 | Ativa | T2015-019 | Instalação, na Subestação Cícero Dantas, de um módulo de conexão, em 69 kV, arranjo barra principal e transferência, para o terceiro transformador trifásico 230/69kV. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CIC. DANTAS | MC 69 kV TR 230/69 kV CIC. DANTAS TR3 BA | RBF | FT TR 230/69 kV CIC. DANTAS TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CIC. DANTAS | MC 230 kV TR 230/69 kV CIC. DANTAS TR5 BA | RBF | FT TR 230/69 kV CIC. DANTAS TR5 BA | 061/2001 | IPCA | RBNI | REA 2823/2011 | 12/30/2012 | 12/29/2044 | R$508,557.96 | 6/1/2025 | Ativa | T2009-121 | Instalar, na SE Cícero Dantas, o módulo de conexão 230 kV, arranjo barra principal e transferência, para o transformador trifásico 230/69 kV, de 50 MVA, por meio da retirada do módulo de conexão 230 kV do transformador 04T2 230/69 kV, de 16,7 MVA e adequação do módulo de conexão 230 kV do transformador 04T1 230/69 kV, de 16,7 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CIC. DANTAS | MC 230 kV TR 230/69 kV CIC. DANTAS TR5 BA | RBF | FT TR 230/69 kV CIC. DANTAS TR5 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2021 | 12/31/2035 | R$5,714.78 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CIC. DANTAS | MC 230 kV TR 230/69 kV CIC. DANTAS TR4 BA | RBF | FT TR 230/69 kV CIC. DANTAS TR4 BA | 061/2001 | IPCA | RBNI | REA 5211/2015 | 3/17/2018 | 8/26/2046 | R$ 1,422,630.22 | 6/1/2025 | Ativa | T2015-019 | Instalação, na SE CIC. DANTAS, de um módulo de conexão, em 230 kV, para o autotransformador TR 230/69 kV CIC. DANTAS TR4 BA *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | CIC. DANTAS | MC 230 kV TR 230/69 kV CIC. DANTAS TR3 BA | RBF | FT TR 230/69 kV CIC. DANTAS TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CIC. DANTAS | MC 230 kV TR 230/69 kV CIC. DANTAS TR3 BA | RBF | FT TR 230/69 kV CIC. DANTAS TR3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/14/2021 | 4/14/2039 | R$5,964.72 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CIC. DANTAS | IB 69 kV MG 230 kV CIC. DANTAS MG1 BA IB2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CIC. DANTAS | IB 230 kV MG 230 kV CIC. DANTAS MG1 BA IB1 | RB | FT MG 230 kV CIC. DANTAS MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,837.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CIC. DANTAS | IB 230 kV MG 230 kV CIC. DANTAS MG1 BA IB1 | RB | FT MG 230 kV CIC. DANTAS MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/4/2013 | 12/27/2046 | R$94,776.13 | 6/1/2025 | Ativa | IB 230 kV MG 230 kV CIC. DANTAS MG1 BA IB1. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CIC. DANTAS | EL 69 kV CIC. DANTAS DIST2 | DIT | 061/2001 | IPCA | RCDM | REN 905/2020 | 3/9/2023 | 3/8/2051 | R$704,635.75 | 6/1/2025 | Ativa | Implantação de um módulo de Entrada de Linha em 69kV, arranjo barra principal e transferência, com destino à SE Cícero Dantas III na SE CÍCERO DANTAS * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2023 - 2024 | ||||
| AXIA Energia Nordeste | CIC. DANTAS | EL 69 kV CIC. DANTAS DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CIC. DANTAS | EL 69 kV CIC. DANTAS DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | CIC. DANTAS | EL 230 kV CIC. DANTAS LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA | RB | FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CIC. DANTAS | EL 230 kV CIC. DANTAS LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA | RB | FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/8/2013 | 12/1/2046 | R$94,559.87 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DO DISJUNTOR FABRICADO POR SIEMENS MODELO H912 14S3 230 KV. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CIC. DANTAS | EL 230 kV CIC. DANTAS LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA | RB | FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/5/2021 | 1/5/2046 | R$180,864.91 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CIC. DANTAS | EL 230 kV CIC. DANTAS LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA | RB | FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CIC. DANTAS | EL 230 kV CIC. DANTAS LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA | RB | FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/1/2013 | 11/24/2046 | R$94,501.64 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DO DISJUNTOR FABRICADO POR SIEMENS MODELO H912 14S2 230 KV. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CIC. DANTAS | EL 230 kV CIC. DANTAS LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA | RB | FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/16/2020 | 8/18/2045 | R$178,549.32 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CIC. DANTAS | EL 230 kV CIC. DANTAS LT 230 kV CIC. DANTAS /OLINDINA C-2 BA | RB | FT LT 230 kV CIC. DANTAS /OLINDINA C-2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CIC. DANTAS | EL 230 kV CIC. DANTAS LT 230 kV CIC. DANTAS /OLINDINA C-2 BA | RB | FT LT 230 kV CIC. DANTAS /OLINDINA C-2 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/23/2013 | 11/15/2046 | R$94,426.78 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DO DISJUNTOR FABRICADO POR SIEMENS MODELO H912 14L3 230 KV. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CIC. DANTAS | EL 230 kV CIC. DANTAS LT 230 kV CIC. DANTAS /OLINDINA C-2 BA | RB | FT LT 230 kV CIC. DANTAS /OLINDINA C-2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/6/2021 | 6/9/2051 | R$122,027.45 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | CIC. DANTAS | EL 230 kV CIC. DANTAS LT 230 kV CIC. DANTAS /OLINDINA C-1 BA | RB | FT LT 230 kV CIC. DANTAS /OLINDINA C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | CIC. DANTAS | EL 230 kV CIC. DANTAS LT 230 kV CIC. DANTAS /OLINDINA C-1 BA | RB | FT LT 230 kV CIC. DANTAS /OLINDINA C-1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/20/2013 | 12/13/2046 | R$94,659.68 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DO DISJUNTOR FABRICADO POR SIEMENS MODELO H912 14L2 230 KV. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | CIC. DANTAS | EL 230 kV CIC. DANTAS LT 230 kV CIC. DANTAS /OLINDINA C-1 BA | RB | FT LT 230 kV CIC. DANTAS /OLINDINA C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/15/2021 | 7/23/2043 | R$131,467.53 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COELHO NETO | TR 230/69 kV COELHO NETO TF2 MA | RBF | FT TR 230/69 kV COELHO NETO TF2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$342,499.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COELHO NETO | TR 230/69 kV COELHO NETO TF2 MA | RBF | FT TR 230/69 kV COELHO NETO TF2 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$743,540.97 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COELHO NETO | TR 230/69 kV COELHO NETO TF2 MA | RBF | FT TR 230/69 kV COELHO NETO TF2 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$713,127.93 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COELHO NETO | TR 230/69 kV COELHO NETO TF1 MA | RBF | FT TR 230/69 kV COELHO NETO TF1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$342,499.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COELHO NETO | TR 230/69 kV COELHO NETO TF1 MA | RBF | FT TR 230/69 kV COELHO NETO TF1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$743,540.97 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COELHO NETO | TR 230/69 kV COELHO NETO TF1 MA | RBF | FT TR 230/69 kV COELHO NETO TF1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$713,127.93 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COELHO NETO | RTL 230 kV 5 Mvar COELHO NETO RT2 MA | RB | FT RTL 230 kV 5 MVAr COELHO NETO RT2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$46,436.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COELHO NETO | RTL 230 kV 5 Mvar COELHO NETO RT2 MA | RB | FT RTL 230 kV 5 MVAr COELHO NETO RT2 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$100,810.61 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COELHO NETO | RTL 230 kV 5 Mvar COELHO NETO RT2 MA | RB | FT RTL 230 kV 5 MVAr COELHO NETO RT2 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$96,687.16 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COELHO NETO | RTL 230 kV 20 Mvar COELHO NETO RT1 MA | RB | FT RTL 230 kV 20 MVAr COELHO NETO RT1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$257,883.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COELHO NETO | MG 230 kV COELHO NETO MG1 MA | RB | FT MG 230 kV COELHO NETO MG1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$497,276.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COELHO NETO | MG 230 kV COELHO NETO MG1 MA | RB | FT MG 230 kV COELHO NETO MG1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,079,548.31 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COELHO NETO | MG 230 kV COELHO NETO MG1 MA | RB | FT MG 230 kV COELHO NETO MG1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,035,391.57 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COELHO NETO | MC 69 kV TR 230/69 kV COELHO NETO TF2 MA | RBF | FT TR 230/69 kV COELHO NETO TF2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$74,722.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COELHO NETO | MC 69 kV TR 230/69 kV COELHO NETO TF1 MA | RBF | FT TR 230/69 kV COELHO NETO TF1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$74,722.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COELHO NETO | MC 230 kV TR 230/69 kV COELHO NETO TF2 MA | RBF | FT TR 230/69 kV COELHO NETO TF2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$174,444.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COELHO NETO | MC 230 kV TR 230/69 kV COELHO NETO TF1 MA | RBF | FT TR 230/69 kV COELHO NETO TF1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$174,444.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COELHO NETO | MC 230 kV TR 230/69 kV COELHO NETO TF1 MA | RBF | FT TR 230/69 kV COELHO NETO TF1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$378,705.10 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COELHO NETO | MC 230 kV RTL 230 kV 5 Mvar COELHO NETO RT2 MA | RB | FT RTL 230 kV 5 MVAr COELHO NETO RT2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$109,485.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COELHO NETO | MC 230 kV RTL 230 kV 20 Mvar COELHO NETO RT1 MA | RB | FT RTL 230 kV 20 MVAr COELHO NETO RT1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$109,485.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COELHO NETO | IB 230 kV MG 230 kV COELHO NETO MG1 MA IB1 | RB | FT MG 230 kV COELHO NETO MG1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$138,061.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COELHO NETO | EL 230 kV COELHO NETO LT 230 kV COELHO NETO /TERESINA C-1 MA/PI | RB | FT LT 230 kV COELHO NETO /TERESINA C-1 MA/PI | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$253,523.26 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COELHO NETO | EL 230 kV COELHO NETO LT 230 kV CAXIAS II /COELHO NETO C-1 MA | RB | FT LT 230 kV CAXIAS II /COELHO NETO C-1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$253,523.26 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | TR 500/230 kV COLETORA PORTO VELHO TF13 RO | RB | FT TR 500/230 kV COLETORA PORTO VELHO TF13 RO | 010/2009 | IPCA | RBNI | DSP 553/2023 | 6/14/2022 | 2/26/2039 | R$896,659.91 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção do Transformador 500/230 kV, 465 MVA, TF13 na SE Coletora Porto Velho. *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | RTB 500 kV 50 Mvar COLETORA PORTO VELHO RTR1 RO | RB | FT RTB 500 kV 50 Mvar COLETORA PORTO VELHO RTR1 RO | 010/2009 | IPCA | RBNI | REA 11871/2022 | 10/4/2024 | 10/3/2060 | R$712,181.98 | 6/1/2025 | Ativa | T2020-031 | Instalar, na SE COLETORA PORTO VELHO, um reator de barra monofásico reserva RTR1 500 kV - 50 Mvar. | ||
| AXIA Energia Norte | COLETORA PORTO VELHO | RTB 500 kV 36,66 Mvar COLETORA PORTO VELHO RTR2 RO | RB | FT RTB 500 kV 36,66 Mvar COLETORA PORTO VELHO RTR2 RO | 010/2009 | IPCA | RBNI | DSP 993/2024 | 8/12/2022 | 8/11/2058 | R$100,694.62 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Módulo Equipamento - Reator reserva em 500 kV, 36,66 MVAr transferido da ESBR para a Eletronorte na Subestação Coletora Porto Velho. | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | RTB 500 kV 150 Mvar COLETORA PORTO VELHO RT2 RO | RB | FT RTB 500 kV 150 Mvar COLETORA PORTO VELHO RT2 RO | 010/2009 | IPCA | RBNI | REA 11871/2022 | 11/28/2024 | 11/27/2060 | R$ 2,136,545.97 | 6/1/2025 | Ativa | T2020-031 | Instalar, na SE COLETORA PORTO VELHO, um banco de reatores de barra monofásicos RT2 500 kV - 150 Mvar. | ||
| AXIA Energia Norte | COLETORA PORTO VELHO | RTB 500 kV 150 Mvar COLETORA PORTO VELHO RT1 RO | RB | FT RTB 500 kV 150 Mvar COLETORA PORTO VELHO RT1 RO | 010/2009 | IPCA | RBNI | REA 11871/2022 | 10/4/2024 | 10/3/2060 | R$ 2,136,545.97 | 6/1/2025 | Ativa | T2020-031 | Instalar, na SE COLETORA PORTO VELHO, um banco de reatores de barra monofásicos RT1 500 kV - 150 Mvar. | ||
| AXIA Energia Norte | COLETORA PORTO VELHO | RTB 500 kV 110 Mvar COLETORA PORTO VELHO RT3 RO | RB | FT RTB 500 kV 110 Mvar COLETORA PORTO VELHO RT3 RO | 010/2009 | IPCA | RBNI | DSP 993/2024 | 8/12/2022 | 8/11/2058 | R$302,083.88 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Módulo Equipamento - Banco de Reatores em 500 kV, 3x36,66 MVAr transferido da ESBR para a Eletronorte na Subestação Coletora Porto Velho. | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | MG 500 kV COLETORA PORTO VELHO MG1 RO | RB | FT MG 500 kV COLETORA PORTO VELHO MG1 RO | 010/2009 | IPCA | RBL | CC 010/2009 | 11/15/2011 | 2/26/2039 | R$ 5,497,858.20 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | MG 500 kV COLETORA PORTO VELHO MG1 RO | RB | FT MG 500 kV COLETORA PORTO VELHO MG1 RO | 010/2009 | IPCA | RBNI | DSP 553/2023 | 6/14/2022 | 2/26/2039 | R$94,958.36 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 500 kV na SE Coletora Porto Velho, associado ao Módulo de Conexão 500 kV, arranjo Disjuntor e Meio, do Transformador 500/230 kV, 465 MVA, TF13 na SE Coletora Porto Velho. *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | MG 500 kV COLETORA PORTO VELHO MG1 RO | RB | FT MG 500 kV COLETORA PORTO VELHO MG1 RO | 010/2009 | IPCA | RBNI | DSP 553/2023 | 6/14/2022 | 2/26/2039 | R$25,369.09 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 230 kV na SE Coletora Porto Velho, associado ao Módulo de Conexão 230 kV, arranjo Principal e Transferência, do Transformador 500/230 kV, 465 MVA, TF13 na SE Coletora Porto Velho. *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | MC 500 kV TR 500/230 kV COLETORA PORTO VELHO TF13 RO | RB | FT TR 500/230 kV COLETORA PORTO VELHO TF13 RO | 010/2009 | IPCA | RBNI | DSP 553/2023 | 6/14/2022 | 2/26/2039 | R$373,706.72 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção do Módulo de Conexão 500 kV, arranjo disjuntor e meio, do Transformador 500/230 kV, 465 MVA, TF13 na SE Coletora Porto Velho. *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | MC 500 kV RTB 500 kV 150 Mvar COLETORA PORTO VELHO RT2 RO | RB | FT RTB 500 kV 150 Mvar COLETORA PORTO VELHO RT2 RO | 010/2009 | IPCA | RBNI | REA 11871/2022 | 11/28/2024 | 11/27/2053 | R$ 1,695,908.72 | 6/1/2025 | Ativa | T2020-031 | Instalar, na SE COLETORA PORTO VELHO, um módulo de conexão com disjuntor, em 500kV,para o reator de barra RT2 500kV - 150 Mvar. | ||
| AXIA Energia Norte | COLETORA PORTO VELHO | MC 500 kV RTB 500 kV 150 Mvar COLETORA PORTO VELHO RT1 RO | RB | FT RTB 500 kV 150 Mvar COLETORA PORTO VELHO RT1 RO | 010/2009 | IPCA | RBNI | REA 11871/2022 | 10/4/2024 | 10/3/2053 | R$ 1,695,908.72 | 6/1/2025 | Ativa | T2020-031 | Instalar, na SE COLETORA PORTO VELHO, um módulo de conexão com disjuntor, em 500kV,para o reator de barra RT1 500kV - 150 Mvar. | ||
| AXIA Energia Norte | COLETORA PORTO VELHO | MC 500 kV RTB 500 kV 110 Mvar COLETORA PORTO VELHO RT3 RO | RB | FT RTB 500 kV 110 Mvar COLETORA PORTO VELHO RT3 RO | 010/2009 | IPCA | RBNI | DSP 993/2024 | 8/12/2022 | 8/11/2050 | R$255,085.89 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Módulo de Manobra - Conexão de Reator em 500 kV, arranjo Barra Disjuntor e Meio, na Subestação Coletora Porto Velho, associado ao banco de reatores 500 kV, (3+1)x36,66 MVAr transferido da ESBR para a Eletronorte. | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | MC 500 kV CV 600/600 kV COLETORA PORTO VELHO CC2 RO | RB | FT CV 600/600 kV ARARAQUARA 2 CC1 SP | 012/2009 | IPCA | RBL | CC 012/2009 | 4/1/2013 | 2/26/2039 | R$758,484.40 | 6/1/2025 | Ativa | T2009-216 | Contrato de Concessão nº 012/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | COLETORA PORTO VELHO | MC 500 kV CV 600/600 kV COLETORA PORTO VELHO CC1 RO | RB | FT CV 600/600 kV ARARAQUARA 2 CC1 SP | 012/2009 | IPCA | RBL | CC 012/2009 | 4/1/2013 | 2/26/2039 | R$758,484.40 | 6/1/2025 | Ativa | T2009-216 | Contrato de Concessão nº 012/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | COLETORA PORTO VELHO | MC 500 kV CV 500/230 kV COLETORA PORTO VELHO BTB2 RO | RB | FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO | 010/2009 | IPCA | RBL | CC 010/2009 | 11/15/2011 | 2/26/2039 | R$879,786.53 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | MC 500 kV CV 500/230 kV COLETORA PORTO VELHO BTB1 RO | RB | FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO | 010/2009 | IPCA | RBL | CC 010/2009 | 11/15/2011 | 2/26/2039 | R$879,786.53 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | MC 500 kV BF 500 kV 283 Mvar COLETORA PORTO VELHO FH51 RO | RB | FT CV 600/600 kV ARARAQUARA 2 CC1 SP | 012/2009 | IPCA | RBL | CC 012/2009 | 4/1/2013 | 2/26/2039 | R$673,511.45 | 6/1/2025 | Ativa | T2009-216 | Contrato de Concessão nº 012/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | COLETORA PORTO VELHO | MC 500 kV BF 500 kV 283 Mvar COLETORA PORTO VELHO FH41 RO | RB | FT CV 600/600 kV ARARAQUARA 2 CC1 SP | 012/2009 | IPCA | RBL | CC 012/2009 | 4/1/2013 | 2/26/2039 | R$673,511.45 | 6/1/2025 | Ativa | T2009-216 | Contrato de Concessão nº 012/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | COLETORA PORTO VELHO | MC 230 kV TR 500/230 kV COLETORA PORTO VELHO TF13 RO | RB | FT TR 500/230 kV COLETORA PORTO VELHO TF13 RO | 010/2009 | IPCA | RBNI | DSP 553/2023 | 6/14/2022 | 2/26/2039 | R$214,925.80 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção do Módulo de Conexão 230 kV, arranjo Principal e Transferência, do Transformador 500/230 kV, 465 MVA, TF13 na SE Coletora Porto Velho. *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | MC 230 kV CV 500/230 kV COLETORA PORTO VELHO BTB2 RO | RB | FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO | 010/2009 | IPCA | RBL | CC 010/2009 | 11/15/2011 | 2/26/2039 | R$368,688.04 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | MC 230 kV CV 500/230 kV COLETORA PORTO VELHO BTB1 RO | RB | FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO | 010/2009 | IPCA | RBL | CC 010/2009 | 11/15/2011 | 2/26/2039 | R$368,688.04 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | MC 230 kV BF 230 kV 59 Mvar COLETORA PORTO VELHO FH74 RO | RB | FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO | 010/2009 | IPCA | RBL | CC 010/2009 | 11/15/2011 | 2/26/2039 | R$321,145.01 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | MC 230 kV BF 230 kV 59 Mvar COLETORA PORTO VELHO FH73 RO | RB | FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO | 010/2009 | IPCA | RBL | CC 010/2009 | 11/15/2011 | 2/26/2039 | R$321,145.01 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | MC 230 kV BF 230 kV 59 Mvar COLETORA PORTO VELHO FH72 RO | RB | FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO | 010/2009 | IPCA | RBL | CC 010/2009 | 11/15/2011 | 2/26/2039 | R$321,145.01 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | MC 230 kV BF 230 kV 59 Mvar COLETORA PORTO VELHO FH71 RO | RB | FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO | 010/2009 | IPCA | RBL | CC 010/2009 | 11/15/2011 | 2/26/2039 | R$321,145.01 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | IB 500 kV MG 500 kV COLETORA PORTO VELHO MG2 RO IB3 | RB | FT CV 600/600 kV ARARAQUARA 2 CC1 SP | 012/2009 | IPCA | RBL | CC 012/2009 | 4/1/2013 | 2/26/2039 | R$292,245.30 | 6/1/2025 | Ativa | T2009-216 | Contrato de Concessão nº 012/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | COLETORA PORTO VELHO | IB 500 kV MG 500 kV COLETORA PORTO VELHO MG2 RO IB2 | RB | FT CV 600/600 kV ARARAQUARA 2 CC1 SP | 012/2009 | IPCA | RBL | CC 012/2009 | 4/1/2013 | 2/26/2039 | R$292,245.30 | 6/1/2025 | Ativa | T2009-216 | Contrato de Concessão nº 012/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | COLETORA PORTO VELHO | IB 500 kV MG 500 kV COLETORA PORTO VELHO MG1 RO IB1 | RB | FT MG 500 kV COLETORA PORTO VELHO MG1 RO | 010/2009 | IPCA | RBL | CC 010/2009 | 11/15/2011 | 2/26/2039 | R$338,983.21 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | IB 230 kV MG 500 kV COLETORA PORTO VELHO MG1 RO IB1 | RB | FT MG 500 kV COLETORA PORTO VELHO MG1 RO | 010/2009 | IPCA | RBL | CC 010/2009 | 11/15/2011 | 2/26/2039 | R$203,864.37 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | EL 230 kV COLETORA PORTO VELHO LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO | RB | FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO | 010/2009 | IPCA | RBL | CC 010/2009 | 11/15/2011 | 2/26/2039 | R$424,856.37 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | EL 230 kV COLETORA PORTO VELHO LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO | RB | FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO | 010/2009 | IPCA | RBL | CC 010/2009 | 11/15/2011 | 2/26/2039 | R$424,856.37 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | CV 600/600 kV COLETORA PORTO VELHO CC2 RO | RB | FT CV 600/600 kV ARARAQUARA 2 CC1 SP | 012/2009 | IPCA | RBL | CC 012/2009 | 4/1/2013 | 2/26/2039 | R$ 64,292,477.45 | 6/1/2025 | Ativa | T2009-216 | Contrato de Concessão nº 012/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | COLETORA PORTO VELHO | CV 600/600 kV COLETORA PORTO VELHO CC1 RO | RB | FT CV 600/600 kV ARARAQUARA 2 CC1 SP | 012/2009 | IPCA | RBL | CC 012/2009 | 4/1/2013 | 2/26/2039 | R$ 64,292,477.45 | 6/1/2025 | Ativa | T2009-216 | Contrato de Concessão nº 012/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | COLETORA PORTO VELHO | CV 500/230 kV COLETORA PORTO VELHO BTB2 RO | RB | FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO | 010/2009 | IPCA | RBL | CC 010/2009 | 11/15/2011 | 2/26/2039 | R$ 36,026,410.26 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | CV 500/230 kV COLETORA PORTO VELHO BTB1 RO | RB | FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO | 010/2009 | IPCA | RBL | CC 010/2009 | 11/15/2011 | 2/26/2039 | R$ 36,026,410.26 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | BF 500 kV 283 Mvar COLETORA PORTO VELHO FH51 RO | RB | FT CV 600/600 kV ARARAQUARA 2 CC1 SP | 012/2009 | IPCA | RBL | CC 012/2009 | 4/1/2013 | 2/26/2039 | R$ 20,363,395.57 | 6/1/2025 | Ativa | T2009-216 | Contrato de Concessão nº 012/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | COLETORA PORTO VELHO | BF 500 kV 283 Mvar COLETORA PORTO VELHO FH41 RO | RB | FT CV 600/600 kV ARARAQUARA 2 CC1 SP | 012/2009 | IPCA | RBL | CC 012/2009 | 4/1/2013 | 2/26/2039 | R$ 20,363,395.57 | 6/1/2025 | Ativa | T2009-216 | Contrato de Concessão nº 012/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | COLETORA PORTO VELHO | BF 500 kV 142 Mvar COLETORA PORTO VELHO FH54 RO | RB | FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO | 010/2009 | IPCA | RBL | CC 010/2009 | 11/15/2011 | 2/26/2039 | R$ 3,193,383.26 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | BF 500 kV 142 Mvar COLETORA PORTO VELHO FH44 RO | RB | FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO | 010/2009 | IPCA | RBL | CC 010/2009 | 11/15/2011 | 2/26/2039 | R$ 6,386,766.53 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | BF 230 kV 59 Mvar COLETORA PORTO VELHO FH74 RO | RB | FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO | 010/2009 | IPCA | RBL | CC 010/2009 | 11/15/2011 | 2/26/2039 | R$ 2,395,038.81 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | BF 230 kV 59 Mvar COLETORA PORTO VELHO FH73 RO | RB | FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO | 010/2009 | IPCA | RBL | CC 010/2009 | 11/15/2011 | 2/26/2039 | R$ 2,395,038.81 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | BF 230 kV 59 Mvar COLETORA PORTO VELHO FH72 RO | RB | FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO | 010/2009 | IPCA | RBL | CC 010/2009 | 11/15/2011 | 2/26/2039 | R$ 2,395,038.81 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | COLETORA PORTO VELHO | BF 230 kV 59 Mvar COLETORA PORTO VELHO FH71 RO | RB | FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO | 010/2009 | IPCA | RBL | CC 010/2009 | 11/15/2011 | 2/26/2039 | R$ 2,395,038.81 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | COLINAS | RTL 500 kV 45,45 Mvar COLINAS RTR1 TO | RB | FT RTL 500 kV 45,45 MVAr COLINAS RTR1 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$298,162.12 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | RTL 500 kV 45,45 Mvar COLINAS RTR1 TO | RB | FT RTL 500 kV 45,45 MVAr COLINAS RTR1 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$647,287.22 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | RTL 500 kV 45,45 Mvar COLINAS RTR1 TO | RB | FT RTL 500 kV 45,45 MVAr COLINAS RTR1 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$620,811.24 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | RTL 500 kV 136 Mvar COLINAS RT2 TO | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$893,734.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | RTL 500 kV 136 Mvar COLINAS RT2 TO | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,940,228.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | RTL 500 kV 136 Mvar COLINAS RT2 TO | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,860,867.52 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | RTL 500 kV 136 Mvar COLINAS RT2 TO | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 12/19/2015 | 12/18/2030 | R$21,680.50 | 6/1/2025 | Ativa | Implantacao de sistema de medicao e monitoramento online de Buchas Condensivas do equipamento CORE702 para integrar ao SISTEMA DE SUPERVISAO SAGE Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COLINAS | RTL 500 kV 136 Mvar COLINAS RT1 TO | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$893,734.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | RTL 500 kV 136 Mvar COLINAS RT1 TO | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,940,228.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | RTL 500 kV 136 Mvar COLINAS RT1 TO | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,860,867.52 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | RTL 500 kV 136 Mvar COLINAS RT1 TO | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 12/19/2015 | 12/18/2030 | R$21,680.50 | 6/1/2025 | Ativa | Implantacao de sistema de medicao e monitoramento online de Buchas Condensivas do equipamento CORE701 para integrar ao SISTEMA DE SUPERVISAO SAGE Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COLINAS | RTB 500 kV 45,45 Mvar COLINAS RTR1 TO | RB | FT RTB 500 kV 45,45 Mvar COLINAS RTR1 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$298,162.12 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | RTB 500 kV 45,45 Mvar COLINAS RTR1 TO | RB | FT RTB 500 kV 45,45 Mvar COLINAS RTR1 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$647,287.22 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | RTB 500 kV 45,45 Mvar COLINAS RTR1 TO | RB | FT RTB 500 kV 45,45 Mvar COLINAS RTR1 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$620,811.24 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | RTB 500 kV 165 Mvar COLINAS RT4 TO | RB | FT RTB 500 kV 165 Mvar COLINAS RT4 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$950,303.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | RTB 500 kV 165 Mvar COLINAS RT4 TO | RB | FT RTB 500 kV 165 Mvar COLINAS RT4 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,063,036.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | RTB 500 kV 165 Mvar COLINAS RT4 TO | RB | FT RTB 500 kV 165 Mvar COLINAS RT4 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,978,652.17 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | MG 500 kV COLINAS MG2 TO | RB | FT MG 500 kV COLINAS MG2 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,077,894.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | MG 500 kV COLINAS MG2 TO | RB | FT MG 500 kV COLINAS MG2 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,340,026.00 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | MG 500 kV COLINAS MG2 TO | RB | FT MG 500 kV COLINAS MG2 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,244,311.96 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | MG 500 kV COLINAS MG2 TO | RB | FT MG 500 kV COLINAS MG2 TO | 058/2001 | IPCA | RMEL | REN 905/2020 | 3/2/2013 | 3/1/2041 | R$32,045.79 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COLINAS | MC 500 kV RTL 500 kV 136 Mvar COLINAS RT2 TO | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$299,304.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | MC 500 kV RTL 500 kV 136 Mvar COLINAS RT1 TO | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$299,304.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | MC 500 kV RTB 500 kV 165 Mvar COLINAS RT4 TO | RB | FT RTB 500 kV 165 Mvar COLINAS RT4 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$423,178.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | MC 500 kV CR 500 kV 161 Mvar COLINAS BC2 TO | RB | FT CR 500 kV 161 MVAr COLINAS BC2 TO | 058/2001 | IPCA | RBNI | DSP 2402/2023 | 10/14/2024 | 10/13/2053 | R$ 1,191,651.16 | 6/1/2025 | Ativa | T2020-019 | Obra de Substituição Completa - Substituição da conexão da Compensação Série Fixa BC2 (COCL7-02) 500 kV, 161 MVAr, na SE Colinas 500 kV. | ||
| AXIA Energia Norte | COLINAS | MC 500 kV CR 500 kV 161 Mvar COLINAS BC1 TO | RB | FT CR 500 kV 161 MVAr COLINAS BC1 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$462,556.47 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | IB 500 kV MG 500 kV COLINAS MG2 TO IB1 | RB | FT MG 500 kV COLINAS MG2 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$524,269.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | IB 500 kV MG 500 kV COLINAS MG2 TO IB1 | RB | FT MG 500 kV COLINAS MG2 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,138,149.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | IB 500 kV MG 500 kV COLINAS MG2 TO IB1 | RB | FT MG 500 kV COLINAS MG2 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,091,595.86 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | EL 500 kV COLINAS LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$559,746.88 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | EL 500 kV COLINAS LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,215,167.79 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | EL 500 kV COLINAS LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,165,463.80 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | EL 500 kV COLINAS LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBNI | REA 5861/2016 | 6/5/2019 | 6/4/2047 | R$55,691.82 | 6/1/2025 | Ativa | Implantação de Unidade de Medição Fasorial – PMU nos bays das LT 500 kV Imperatriz / Colinas C-1. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | COLINAS | EL 500 kV COLINAS LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RMEL | REN 905/2020 | 3/23/2020 | 3/26/2050 | R$98,208.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COLINAS | EL 500 kV COLINAS LT 500 kV COLINAS /MIRACEMA C-1 TO | RB | FT LT 500 kV COLINAS /MIRACEMA C-1 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$559,746.88 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | EL 500 kV COLINAS LT 500 kV COLINAS /MIRACEMA C-1 TO | RB | FT LT 500 kV COLINAS /MIRACEMA C-1 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,215,167.79 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | EL 500 kV COLINAS LT 500 kV COLINAS /MIRACEMA C-1 TO | RB | FT LT 500 kV COLINAS /MIRACEMA C-1 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,165,463.80 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | EL 500 kV COLINAS LT 500 kV COLINAS /MIRACEMA C-1 TO | RB | FT LT 500 kV COLINAS /MIRACEMA C-1 TO | 058/2001 | IPCA | RBNI | REA 5861/2016 | 6/3/2019 | 6/2/2047 | R$48,324.98 | 6/1/2025 | Ativa | Implantação de Unidade de Medição Fasorial – PMU nos bays das LT 500 kV Colinas / Miracema C-1. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | COLINAS | CR 500 kV 161 Mvar COLINAS BC2 TO | RB | FT CR 500 kV 161 MVAr COLINAS BC2 TO | 058/2001 | IPCA | RBNI | REA 9918/2021 | 4/17/2024 | 4/16/2044 | R$ 11,420,736.07 | 6/1/2025 | Ativa | T2020-019 | Obra de Substituição Completa - Substituição do banco de capacitores série (CR-COCL7-02), localizado na saída de linha da LT 500 kV Colinas – Miracema C1, de 23,8 Ohms e IN= 1500 / 2250 A, por outro de mesmo valor ôhmico e IN= 1650 / 2250 A. | ||
| AXIA Energia Norte | COLINAS | CR 500 kV 161 Mvar COLINAS BC1 TO | RB | FT CR 500 kV 161 MVAr COLINAS BC1 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$653,733.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | CR 500 kV 161 Mvar COLINAS BC1 TO | RB | FT CR 500 kV 161 MVAr COLINAS BC1 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,419,204.81 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COLINAS | CR 500 kV 161 Mvar COLINAS BC1 TO | RB | FT CR 500 kV 161 MVAr COLINAS BC1 TO | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/3/2014 | 11/2/2029 | R$152,035.83 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COLINAS | CR 500 kV 161 Mvar COLINAS BC1 TO | RB | FT CR 500 kV 161 MVAr COLINAS BC1 TO | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 12/26/2022 | 12/25/2037 | R$52,255.83 | 6/1/2025 | Ativa | 05 Colunas e 05 Links Opticos e 01 Placa SG 101 Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | COMPERJ | MG 345 kV COMPERJ MG2 RJ | RB | FT MG 345 kV COMPERJ MG2 RJ | 062/2001 | IPCA | RBNI | DSP 1154/2024 | 1/13/2024 | 1/12/2042 | R$73,831.43 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura Geral de Acessante -MIG-A 345 kV na SE Comperj, em função do seccionamento da LT 345 kV Adrianópolis - Macaé Merchan C2. | |||
| AXIA Energia | COMPERJ | MG 345 kV COMPERJ MG2 RJ | RB | FT MG 345 kV COMPERJ MG2 RJ | 062/2001 | IPCA | RBNI | DSP 1154/2024 | 1/13/2024 | 1/12/2055 | R$64,122.35 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra -MIM 345 kV na SE Comperj, em função do seccionamento da LT 345 kV Adrianópolis - Macaé Merchan C2. | |||
| AXIA Energia | COMPERJ | IB 345 kV MG 345 kV COMPERJ MG2 RJ IB2 | RB | FT MG 345 kV COMPERJ MG2 RJ | 062/2001 | IPCA | RBNI | DSP 1154/2024 | 1/13/2024 | 1/12/2056 | R$233,853.75 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Interligação de Barras -IB 345 kV na SE Comperj, em função do seccionamento da LT 345 kV Adrianópolis - Macaé Merchan C2. | |||
| AXIA Energia | COMPERJ | EL 345 kV COMPERJ LT 345 kV COMPERJ /LAGOS C-1 RJ | RB | FT LT 345 kV COMPERJ /LAGOS C-1 RJ | 062/2001 | IPCA | RBNI | DSP 1154/2024 | 1/13/2024 | 1/12/2052 | R$217,523.18 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 345 kV, arranjo Disjuntor e Meio, na subestação Comperj, associada à Linha de Transmissão 345 kV Comperj – Macaé Merchan C1. | |||
| AXIA Energia | COMPERJ | EL 345 kV COMPERJ LT 345 kV ADRIANOPOLIS /COMPERJ C-1 RJ | RB | FT LT 345 kV ADRIANOPOLIS /COMPERJ C-1 RJ | 062/2001 | IPCA | RBNI | DSP 1154/2024 | 1/13/2024 | 1/12/2052 | R$217,523.18 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 345 kV, arranjo Disjuntor e Meio, na subestação Comperj, associada à Linha de Transmissão 345 kV Adrianópolis – Comperj C1. | |||
| AXIA Energia Nordeste | COREMAS | TT 69/13,8 kV COREMAS TA1 PB | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COREMAS | TT 69/13,8 kV COREMAS TA1 PB | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$248,222.69 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COREMAS | TR 230/69 kV COREMAS TR4 PB | RBF | FT TR 230/69 kV COREMAS TR4 PB | 061/2001 | IPCA | RBNIA | DSP 921/2024 | R$ 2,072,151.21 | 6/1/2025 | Prevista | T2024-103 | Instalar, na SE COREMAS, transformação trifásica TR4 230/69-13,8 kV - 100 MVA. | ||||
| AXIA Energia Nordeste | COREMAS | TR 230/69 kV COREMAS TR3 PB | RBF | FT TR 230/69 kV COREMAS TR3 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COREMAS | TR 230/69 kV COREMAS TR2 PB | RBF | FT TR 230/69 kV COREMAS TR2 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COREMAS | TR 230/69 kV COREMAS TR1 PB | RBF | FT TR 230/69 kV COREMAS TR1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COREMAS | TR 230/69 kV COREMAS TR1 PB | RBF | FT TR 230/69 kV COREMAS TR1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COREMAS | TR 230/69 kV COREMAS TR1 PB | RBF | FT TR 230/69 kV COREMAS TR1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$913,997.96 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COREMAS | RTB 13,8 kV 5 Mvar COREMAS RT1 PB | RBF | FT RTB 13,8 kV 5 MVAr COREMAS RT1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COREMAS | RTB 13,8 kV 5 Mvar COREMAS RT1 PB | RBF | FT RTB 13,8 kV 5 MVAr COREMAS RT1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$351,841.75 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COREMAS | RTB 13,8 kV 5 Mvar COREMAS RT1 PB | RBF | FT RTB 13,8 kV 5 MVAr COREMAS RT1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$324,355.11 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COREMAS | MG 230 kV COREMAS MG1 PB | RB | FT MG 230 kV COREMAS MG1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$510,880.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COREMAS | MG 230 kV COREMAS MG1 PB | RB | FT MG 230 kV COREMAS MG1 PB | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/30/2013 | 11/29/2041 | R$56,867.95 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SISTEMAS AUTOMÁTICOS DE REGULAÇÃO ASSOCIADOS A TRANSFORMADORES. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | COREMAS | MG 230 kV COREMAS MG1 PB | RB | FT MG 230 kV COREMAS MG1 PB | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/16/2015 | 10/15/2032 | R$17,349.40 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição das Bateriais Saturnia 60PZS400 125 Vcc, Posições 800A1 e 800A2 .Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | COREMAS | MG 230 kV COREMAS MG1 PB | RB | FT MG 230 kV COREMAS MG1 PB | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/17/2015 | 12/16/2030 | R$12,019.84 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SWITCH.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | COREMAS | MG 230 kV COREMAS MG1 PB | RB | FT MG 230 kV COREMAS MG1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,433,615.70 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COREMAS | MG 230 kV COREMAS MG1 PB | RB | FT MG 230 kV COREMAS MG1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,321,618.51 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COREMAS | MG 230 kV COREMAS MG1 PB | RB | FT MG 230 kV COREMAS MG1 PB | 061/2001 | IPCA | RBNI | REA 7761/2019 | 8/31/2015 | 1/28/2039 | R$53,345.63 | 6/1/2025 | Ativa | Implantação de Sistema para acesso remoto a dispositivos de Proteção, Controle e Automação. Sistema composto de Painel com PCs Industriais (1 Concentrador, 1 Firewall, 1 Receptor GPS, 2 Switchs Gerenciáveis) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | COREMAS | MG 230 kV COREMAS MG1 PB | RB | FT MG 230 kV COREMAS MG1 PB | 061/2001 | IPCA | RBNIA | DSP 921/2024 | R$180,784.22 | 6/1/2025 | Prevista | T2024-103 | Módulo de Infraestrutura em 230 kV associado ao 4º Transformador de Potência (TR4) Trifásico 230/69 kV de 100 MVA na SE Coremas. | ||||
| AXIA Energia Nordeste | COREMAS | MG 230 kV COREMAS MG1 PB | RB | FT MG 230 kV COREMAS MG1 PB | 061/2001 | IPCA | RBNIA | DSP 921/2024 | R$51,990.22 | 6/1/2025 | Prevista | T2024-103 | Módulo de Infraestrutura em 69 kV associado ao 4º Transformador de Potência (TR4) Trifásico 230/69 kV de 100 MVA na SE Coremas. | ||||
| AXIA Energia Nordeste | COREMAS | MG 230 kV COREMAS MG1 PB | RB | FT MG 230 kV COREMAS MG1 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/4/2021 | 5/4/2039 | R$247,375.97 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | COREMAS | MC 69 kV TT 69/13,8 kV COREMAS TA1 PB | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COREMAS | MC 69 kV TR 230/69 kV COREMAS TR4 PB | RBF | FT TR 230/69 kV COREMAS TR4 PB | 061/2001 | IPCA | RBNIA | DSP 921/2024 | R$581,404.60 | 6/1/2025 | Prevista | T2024-103 | Instalar, na SE COREMAS, um módulo de conexão, em 69 kV, para o transformador trifásico TR4 230/69 kV - 100 MVA, arranjo Barra Principal e Transferência. | ||||
| AXIA Energia Nordeste | COREMAS | MC 69 kV TR 230/69 kV COREMAS TR3 PB | RBF | FT TR 230/69 kV COREMAS TR3 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COREMAS | MC 69 kV TR 230/69 kV COREMAS TR2 PB | RBF | FT TR 230/69 kV COREMAS TR2 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COREMAS | MC 69 kV TR 230/69 kV COREMAS TR1 PB | RBF | FT TR 230/69 kV COREMAS TR1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COREMAS | MC 69 kV TR 230/69 kV COREMAS TR1 PB | RBF | FT TR 230/69 kV COREMAS TR1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COREMAS | MC 69 kV TR 230/69 kV COREMAS TR1 PB | RBF | FT TR 230/69 kV COREMAS TR1 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/5/2020 | 1/4/2044 | R$2,492.14 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | COREMAS | MC 230 kV TR 230/69 kV COREMAS TR4 PB | RBF | FT TR 230/69 kV COREMAS TR4 PB | 061/2001 | IPCA | RBNIA | DSP 921/2024 | R$ 1,696,970.28 | 6/1/2025 | Prevista | T2024-103 | Instalar, na SE COREMAS, um módulo de conexão, em 230 kV, para o transformador trifásico TR4 230/69 kV - 100 MVA, arranjo Barra Dupla a Cinco Chaves. | ||||
| AXIA Energia Nordeste | COREMAS | MC 230 kV TR 230/69 kV COREMAS TR3 PB | RBF | FT TR 230/69 kV COREMAS TR3 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COREMAS | MC 230 kV TR 230/69 kV COREMAS TR3 PB | RBF | FT TR 230/69 kV COREMAS TR3 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/30/2022 | 12/29/2037 | R$3,096.03 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | COREMAS | MC 230 kV TR 230/69 kV COREMAS TR2 PB | RBF | FT TR 230/69 kV COREMAS TR2 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COREMAS | MC 230 kV TR 230/69 kV COREMAS TR2 PB | RBF | FT TR 230/69 kV COREMAS TR2 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/30/2022 | 12/29/2037 | R$3,145.62 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | COREMAS | MC 230 kV TR 230/69 kV COREMAS TR1 PB | RBF | FT TR 230/69 kV COREMAS TR1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COREMAS | MC 230 kV TR 230/69 kV COREMAS TR1 PB | RBF | FT TR 230/69 kV COREMAS TR1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$454,511.36 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COREMAS | MC 230 kV TR 230/69 kV COREMAS TR1 PB | RBF | FT TR 230/69 kV COREMAS TR1 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/21/2020 | 2/23/2046 | R$53,540.35 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | COREMAS | MC 13,8 kV TR 230/69 kV COREMAS TR1 PB | RBF | FT TR 230/69 kV COREMAS TR1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COREMAS | MC 13,8 kV RTB 13,8 kV 5 Mvar COREMAS RT1 PB | RBF | FT RTB 13,8 kV 5 MVAr COREMAS RT1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,598.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COREMAS | IB 69 kV MG 230 kV COREMAS MG1 PB IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COREMAS | IB 69 kV MG 230 kV COREMAS MG1 PB IB1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$118,244.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COREMAS | IB 230 kV MG 230 kV COREMAS MG1 PB IB1 | RB | FT MG 230 kV COREMAS MG1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,085.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COREMAS | IB 230 kV MG 230 kV COREMAS MG1 PB IB1 | RB | FT MG 230 kV COREMAS MG1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$373,459.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COREMAS | EL 69 kV COREMAS DIST8 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COREMAS | EL 69 kV COREMAS DIST8 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COREMAS | EL 69 kV COREMAS DIST7 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COREMAS | EL 69 kV COREMAS DIST7 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COREMAS | EL 69 kV COREMAS DIST6 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COREMAS | EL 69 kV COREMAS DIST6 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COREMAS | EL 69 kV COREMAS DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COREMAS | EL 69 kV COREMAS DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COREMAS | EL 69 kV COREMAS DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COREMAS | EL 69 kV COREMAS DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COREMAS | EL 69 kV COREMAS DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COREMAS | EL 69 kV COREMAS DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COREMAS | EL 69 kV COREMAS DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COREMAS | EL 230 kV COREMAS LT 230 kV MILAGRES /COREMAS C-2 CE/PB | RB | FT LT 230 kV MILAGRES /COREMAS C-2 CE/PB | 008/2005 | IGPM | RBL | CC 008/2005 | 9/25/2009 | 3/4/2035 | R$230,967.12 | 6/1/2025 | Ativa | T2000-016 | Contrato de Concessão nº 008/2005 *(Considera adicional de RGR relativo à prorrogação do encargo) | ||
| AXIA Energia Nordeste | COREMAS | EL 230 kV COREMAS LT 230 kV MILAGRES /COREMAS C-1 CE/PB | RB | FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COREMAS | EL 230 kV COREMAS LT 230 kV MILAGRES /COREMAS C-1 CE/PB | RB | FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COREMAS | EL 230 kV COREMAS LT 230 kV MILAGRES /COREMAS C-1 CE/PB | RB | FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB | 061/2001 | IPCA | RBNI | REA 5861/2016 | 12/8/2013 | 12/7/2041 | R$31,088.94 | 6/1/2025 | Ativa | Substituição de sistemas de proteção e painéis associados em 01 terminal de linha de transmissão LT 04M6 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | COREMAS | EL 230 kV COREMAS LT 230 kV MILAGRES /COREMAS C-1 CE/PB | RB | FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/27/2020 | 7/30/2041 | R$120,156.95 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | CORUMBA | MG 345 kV CORUMBA MG1 GO | RB | FT MG 345 kV CORUMBA MG1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$584,035.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CORUMBA | MG 345 kV CORUMBA MG1 GO | RB | FT MG 345 kV CORUMBA MG1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,241,164.02 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CORUMBA | MG 345 kV CORUMBA MG1 GO | RB | FT MG 345 kV CORUMBA MG1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,402,647.80 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CORUMBA | MG 345 kV CORUMBA MG1 GO | RB | FT MG 345 kV CORUMBA MG1 GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 8/25/2017 | 6/20/2032 | R$11,168.88 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CORUMBA | MG 345 kV CORUMBA MG1 GO | RB | FT MG 345 kV CORUMBA MG1 GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 8/25/2017 | 6/20/2032 | R$11,168.88 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CORUMBA | MG 345 kV CORUMBA MG1 GO | RB | FT MG 345 kV CORUMBA MG1 GO | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/28/2018 | 11/6/2046 | R$124,658.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | CORUMBA | MC 345 kV TR 345/13,8 kV CORUMBA TRUG3 GO | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | CORUMBA | MC 345 kV TR 345/13,8 kV CORUMBA TRUG2 GO | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | CORUMBA | MC 345 kV TR 345/13,8 kV CORUMBA TRUG1 GO | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | CORUMBA | IB 345 kV MG 345 kV CORUMBA MG1 GO IB1 | RB | FT MG 345 kV CORUMBA MG1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CORUMBA | IB 345 kV MG 345 kV CORUMBA MG1 GO IB1 | RB | FT MG 345 kV CORUMBA MG1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$928,957.53 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CORUMBA | IB 345 kV MG 345 kV CORUMBA MG1 GO IB1 | RB | FT MG 345 kV CORUMBA MG1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$995,892.20 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CORUMBA | EL 345 kV CORUMBA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG | RB | FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CORUMBA | EL 345 kV CORUMBA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG | RB | FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,229,990.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CORUMBA | EL 345 kV CORUMBA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG | RB | FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,318,615.67 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CORUMBA | EL 345 kV CORUMBA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG | RB | FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG | 062/2001 | IPCA | RBNI | REA 5861/2016 | 2/9/2021 | 2/8/2036 | R$202,593.09 | 6/1/2025 | Ativa | LT 345 kV Itumbiara - Corumbá: Revitalização do Sistema de Proteção, Supervisão e circuitos secundários de corrente, potencial e controle. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | CORUMBA | EL 345 kV CORUMBA LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | RB | FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CORUMBA | EL 345 kV CORUMBA LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | RB | FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,229,990.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CORUMBA | EL 345 kV CORUMBA LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | RB | FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,318,615.67 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | CORUMBA | EL 345 kV CORUMBA LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | RB | FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | 062/2001 | IPCA | RBNI | REA 4347/2013 | 4/9/2018 | 4/8/2033 | R$26,556.45 | 6/1/2025 | Ativa | Substituição de RDP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | COTEGIPE | TT 69/69 kV COTEGIPE TA2 BA | DIT | 061/2001 | IPCA | RCDM | REA 7806/2019 | 6/18/2021 | 7/14/2051 | R$380,919.75 | 6/1/2025 | Ativa | T2019-001 | Obra de Substituição Completa - Substituição do TA2 por outro transformador de aterramento, 69 kV, 15 MVA, devido a implantação do quinto transformador 230/69 kV na SE Cotegipe. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | COTEGIPE | TT 69/13,8 kV COTEGIPE TA1 BA | DIT | 061/2001 | IPCA | RCDM | REA 3578/2012 | 1/17/2016 | 9/14/2046 | R$182,633.94 | 6/1/2025 | Ativa | Obra de Substituição Completa - Substituição de 1 transformador de aterramento: 02A1. INCLUIDA NO CICLO 2016/2017 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | TT 69/13,8 kV COTEGIPE TA1 BA | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 1/19/2016 | 1/21/2046 | R$2,197.30 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | TR 69/13,8 kV COTEGIPE TR8 BA | RB | FT MG 230 kV COTEGIPE MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COTEGIPE | TR 230/69 kV COTEGIPE TR5 BA | RBF | FT TR 230/69 kV COTEGIPE TR5 BA | 061/2001 | IPCA | RBNI | REA 7806/2019 | 6/14/2021 | 10/3/2055 | R$ 2,179,637.43 | 6/1/2025 | Ativa | T2019-001 | Implantação do quinto transformador 230/69 kV - 100 MVA na SE Cotegipe. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | COTEGIPE | TR 230/69 kV COTEGIPE TR4 BA | RBF | FT TR 230/69 kV COTEGIPE TR4 BA | 061/2001 | IPCA | RBNI | REA 5166/2015 | 12/29/2017 | 8/24/2052 | R$ 1,320,743.28 | 6/1/2025 | Ativa | T2015-007 | Instalar 4º transformador 230/69 kV – 100 MVA. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | COTEGIPE | TR 230/69 kV COTEGIPE TR3 BA | RBF | FT TR 230/69 kV COTEGIPE TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COTEGIPE | TR 230/69 kV COTEGIPE TR3 BA | RBF | FT TR 230/69 kV COTEGIPE TR3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/12/2021 | 11/19/2056 | R$7,162.56 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | COTEGIPE | TR 230/69 kV COTEGIPE TR2 BA | RBF | FT TR 230/69 kV COTEGIPE TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COTEGIPE | TR 230/69 kV COTEGIPE TR2 BA | RBF | FT TR 230/69 kV COTEGIPE TR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COTEGIPE | TR 230/69 kV COTEGIPE TR2 BA | RBF | FT TR 230/69 kV COTEGIPE TR2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/24/2022 | 4/1/2057 | R$14,728.33 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | COTEGIPE | TR 230/69 kV COTEGIPE TR1 BA | RBF | FT TR 230/69 kV COTEGIPE TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COTEGIPE | TR 230/69 kV COTEGIPE TR1 BA | RBF | FT TR 230/69 kV COTEGIPE TR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/25/2022 | 4/2/2057 | R$16,933.85 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | COTEGIPE | MG 230 kV COTEGIPE MG1 BA | RB | FT MG 230 kV COTEGIPE MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$645,411.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COTEGIPE | MG 230 kV COTEGIPE MG1 BA | RB | FT MG 230 kV COTEGIPE MG1 BA | 061/2001 | IPCA | RBNI | REA 5166/2015 | 12/29/2017 | 6/22/2048 | R$194,036.38 | 6/1/2025 | Ativa | T2015-007 | Instalar módulo de infraestrutura de manobra para o módulo de conexão de transformador 230 kV para o Transformador 230/69 kV - 100 MVA na SE COTEGIPE. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | COTEGIPE | MG 230 kV COTEGIPE MG1 BA | RB | FT MG 230 kV COTEGIPE MG1 BA | 061/2001 | IPCA | RBNI | REA 5166/2015 | 12/29/2017 | 12/28/2047 | R$56,606.81 | 6/1/2025 | Ativa | T2015-007 | Instalar módulo de infraestrutura de manobra para o módulo de conexão de transformador 69 kV para o Transformador 230/69 kV - 100 MVA na SE COTEGIPE. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | COTEGIPE | MG 230 kV COTEGIPE MG1 BA | RB | FT MG 230 kV COTEGIPE MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/30/2013 | 9/29/2030 | R$2,187.57 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCOS DE BATERIAS -48Vcc. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | COTEGIPE | MG 230 kV COTEGIPE MG1 BA | RB | FT MG 230 kV COTEGIPE MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,811,133.73 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COTEGIPE | MG 230 kV COTEGIPE MG1 BA | RB | FT MG 230 kV COTEGIPE MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,669,644.02 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COTEGIPE | MG 230 kV COTEGIPE MG1 BA | RB | FT MG 230 kV COTEGIPE MG1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 2/5/2016 | 2/7/2046 | R$6,543.18 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | COTEGIPE | MG 230 kV COTEGIPE MG1 BA | RB | FT MG 230 kV COTEGIPE MG1 BA | 061/2001 | IPCA | RBNI | REA 7806/2019 | 6/22/2021 | 5/15/2050 | R$223,616.41 | 6/1/2025 | Ativa | T2019-001 | Adequação do módulo geral com um módulo de infraestrutura em 230 kV devido a implantação do quinto transformador 230/69 kV na SE Cotegipe. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | COTEGIPE | MG 230 kV COTEGIPE MG1 BA | RB | FT MG 230 kV COTEGIPE MG1 BA | 061/2001 | IPCA | RBNI | REA 7806/2019 | 6/22/2021 | 7/8/2049 | R$64,605.18 | 6/1/2025 | Ativa | T2019-001 | Adequação do módulo geral com um módulo de infraestrutura em 69 kV devido a implantação do quinto transformador 230/69 kV na SE Cotegipe. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | COTEGIPE | MG 230 kV COTEGIPE MG1 BA | RB | FT MG 230 kV COTEGIPE MG1 BA | 061/2001 | IPCA | RBNI | REA 7806/2019 | 6/22/2021 | 6/21/2061 | R$21,833.74 | 6/1/2025 | Ativa | T2019-001 | Recapacitação do barramento de 230 kV devido a implantação do quinto transformador 230/69 kV, 100 MVA, na SE Cotegipe. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | COTEGIPE | MG 230 kV COTEGIPE MG1 BA | RB | FT MG 230 kV COTEGIPE MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/7/2021 | 10/4/2042 | R$957,194.52 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | COTEGIPE | MG 230 kV COTEGIPE MG1 BA | RB | FT MG 230 kV COTEGIPE MG1 BA | 061/2001 | IPCA | RBNI | REN 1020/2022 | 11/19/2023 | 11/18/2054 | R$53,304.68 | 6/1/2025 | Ativa | MIM associado à instalação de um módulo de entrada69 kV, arranjo BPT, com destino à SE Lauro de Freitas na SE Cotegipe. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2025 - 2026 | |||
| AXIA Energia Nordeste | COTEGIPE | MC 69 kV TT 69/69 kV COTEGIPE TA2 BA | DIT | 061/2001 | IPCA | RCDM | REA 7806/2019 | 6/18/2021 | 7/27/2036 | R$115,731.56 | 6/1/2025 | Ativa | T2019-001 | Conexão para o transformador de aterramento TA2, 69 kV, devido a implantação do quinto transformador 230/69 kV na SE Cotegipe. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | COTEGIPE | MC 69 kV TT 69/13,8 kV COTEGIPE TA1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COTEGIPE | MC 69 kV TR 69/13,8 kV COTEGIPE TR8 BA | RB | FT MG 230 kV COTEGIPE MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COTEGIPE | MC 69 kV TR 69/13,8 kV COTEGIPE TR8 BA | RB | FT MG 230 kV COTEGIPE MG1 BA | 061/2001 | IPCA | RBNI | REA 1814/2009 | 1/30/2013 | 1/29/2046 | R$29,287.00 | 6/1/2025 | Ativa | Substituição de Disjuntor Superado 12T8, autorizada pela REA 1814/2009. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | COTEGIPE | MC 69 kV TR 230/69 kV COTEGIPE TR5 BA | RBF | FT TR 230/69 kV COTEGIPE TR5 BA | 061/2001 | IPCA | RBNI | REA 7806/2019 | 6/14/2021 | 7/2/2052 | R$582,366.69 | 6/1/2025 | Ativa | T2019-001 | Instalação, na SE COTEGIPE, de um módulo de conexão, em 69 kV, para o autotransformador TR 230/69 kV COTEGIPE TR-5 BA *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | COTEGIPE | MC 69 kV TR 230/69 kV COTEGIPE TR4 BA | RBF | FT TR 230/69 kV COTEGIPE TR4 BA | 061/2001 | IPCA | RBNI | REA 5166/2015 | 12/29/2017 | 3/8/2050 | R$386,710.05 | 6/1/2025 | Ativa | T2015-007 | Instalar módulo de conexão de transformador 69 kV para o Transformador 230/69 kV - 100 MVA, arranjo BPT, na SE COTEGIPE. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | COTEGIPE | MC 69 kV TR 230/69 kV COTEGIPE TR3 BA | RBF | FT TR 230/69 kV COTEGIPE TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COTEGIPE | MC 69 kV TR 230/69 kV COTEGIPE TR2 BA | RBF | FT TR 230/69 kV COTEGIPE TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COTEGIPE | MC 69 kV TR 230/69 kV COTEGIPE TR2 BA | RBF | FT TR 230/69 kV COTEGIPE TR2 BA | 061/2001 | IPCA | RBNI | REA 7806/2019 | 6/14/2021 | 6/19/2045 | R$103,744.63 | 6/1/2025 | Ativa | T2019-001 | Relocação e adequações na conexão do transformador (04T2), em 69 kV, devido a implantação do TR5 na SE Cotegipe. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | COTEGIPE | MC 69 kV TR 230/69 kV COTEGIPE TR1 BA | RBF | FT TR 230/69 kV COTEGIPE TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COTEGIPE | MC 69 kV BC 69 kV 27,1 Mvar COTEGIPE BC2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COTEGIPE | MC 69 kV BC 69 kV 27,1 Mvar COTEGIPE BC2 BA | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 2/4/2016 | 2/6/2046 | R$2,180.87 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | MC 69 kV BC 69 kV 27,1 Mvar COTEGIPE BC2 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/6/2017 | 3/5/2050 | R$5,277.76 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | MC 69 kV BC 69 kV 21,3 Mvar COTEGIPE BC1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COTEGIPE | MC 69 kV BC 69 kV 21,3 Mvar COTEGIPE BC1 BA | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/24/2016 | 5/27/2046 | R$4,325.92 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | MC 230 kV TR 230/69 kV COTEGIPE TR5 BA | RBF | FT TR 230/69 kV COTEGIPE TR5 BA | 061/2001 | IPCA | RBNI | REA 7806/2019 | 6/14/2021 | 4/26/2051 | R$ 1,558,591.98 | 6/1/2025 | Ativa | T2019-001 | Instalação, na SE COTEGIPE, de um módulo de conexão, em 230 kV, para o autotransformador TR 230/69 kV COTEGIPE TR-5 BA *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | COTEGIPE | MC 230 kV TR 230/69 kV COTEGIPE TR4 BA | RBF | FT TR 230/69 kV COTEGIPE TR4 BA | 061/2001 | IPCA | RBNI | REA 5166/2015 | 12/29/2017 | 4/21/2050 | R$998,406.16 | 6/1/2025 | Ativa | T2015-007 | Instalar módulo de conexão de transformador 230 kV para o 4º Transformador 230/69 kV - 100 MVA na SE COTEGIPE. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | COTEGIPE | MC 230 kV TR 230/69 kV COTEGIPE TR4 BA | RBF | FT TR 230/69 kV COTEGIPE TR4 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 2/5/2016 | 2/7/2046 | R$6,543.17 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | COTEGIPE | MC 230 kV TR 230/69 kV COTEGIPE TR4 BA | RBF | FT TR 230/69 kV COTEGIPE TR4 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/30/2017 | 7/29/2041 | R$14,641.86 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | COTEGIPE | MC 230 kV TR 230/69 kV COTEGIPE TR3 BA | RBF | FT TR 230/69 kV COTEGIPE TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COTEGIPE | MC 230 kV TR 230/69 kV COTEGIPE TR2 BA | RBF | FT TR 230/69 kV COTEGIPE TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COTEGIPE | MC 230 kV TR 230/69 kV COTEGIPE TR2 BA | RBF | FT TR 230/69 kV COTEGIPE TR2 BA | 061/2001 | IPCA | RBNI | REA 2837/2011 | 6/6/2014 | 12/2/2046 | R$34,035.68 | 6/1/2025 | Ativa | Substituição da seccionadora 34T2-4. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | COTEGIPE | MC 230 kV TR 230/69 kV COTEGIPE TR2 BA | RBF | FT TR 230/69 kV COTEGIPE TR2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/18/2022 | 7/22/2055 | R$192,511.49 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | COTEGIPE | MC 230 kV TR 230/69 kV COTEGIPE TR1 BA | RBF | FT TR 230/69 kV COTEGIPE TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COTEGIPE | MC 230 kV TR 230/69 kV COTEGIPE TR1 BA | RBF | FT TR 230/69 kV COTEGIPE TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$410,719.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COTEGIPE | IB 69 kV MG 230 kV COTEGIPE MG1 BA IB2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COTEGIPE | IB 69 kV MG 230 kV COTEGIPE MG1 BA IB2 | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 1/30/2014 | 2/26/2047 | R$31,757.89 | 6/1/2025 | Ativa | Substituição de Disjuntor Superado 12D2. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | IB 69 kV MG 230 kV COTEGIPE MG1 BA IB2 | DIT | 061/2001 | IPCA | RCDM | REA 7806/2019 | 6/18/2021 | 4/22/2037 | R$54,276.31 | 6/1/2025 | Ativa | T2019-001 | Adequação na interligação de barramentos em 69 kV devido a implantação do quinto transformador 230/69 kV, 100 MVA, na SE Cotegipe. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | COTEGIPE | IB 69 kV MG 230 kV COTEGIPE MG1 BA IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COTEGIPE | IB 69 kV MG 230 kV COTEGIPE MG1 BA IB1 | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 2/1/2013 | 2/28/2046 | R$30,751.08 | 6/1/2025 | Ativa | Substituição de Disjuntor Superado 12D1. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | IB 230 kV MG 230 kV COTEGIPE MG1 BA IB1 | RB | FT MG 230 kV COTEGIPE MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,837.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COTEGIPE | IB 230 kV MG 230 kV COTEGIPE MG1 BA IB1 | RB | FT MG 230 kV COTEGIPE MG1 BA | 061/2001 | IPCA | RBNI | REA 2837/2011 | 9/4/2014 | 9/20/2047 | R$90,932.63 | 6/1/2025 | Ativa | Substituição do disjuntor 14D1. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | COTEGIPE | IB 230 kV MG 230 kV COTEGIPE MG1 BA IB1 | RB | FT MG 230 kV COTEGIPE MG1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 1/14/2016 | 1/16/2046 | R$4,392.63 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE PARIPE 02L2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE PARIPE 02L2 | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 5/5/2013 | 6/1/2046 | R$31,008.90 | 6/1/2025 | Ativa | Substituição de Disjuntor Superado 12L2. Incluído no reajuste ciclo 2014-2015. RAP ativada no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE PARIPE 02L2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/11/2013 | 7/15/2038 | R$6,614.88 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE MILLENIUM 02C2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE MILLENIUM 02C2 | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 1/30/2013 | 1/29/2046 | R$29,287.00 | 6/1/2025 | Ativa | Substituição de Disjuntor Superado 12C2, autorizada pela REA 1814/2009. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE MILLENIUM 02C2 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 1/18/2016 | 1/20/2046 | R$8,788.42 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE MILLENIUM 02C1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE MILLENIUM 02C1 | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 1/30/2013 | 1/29/2046 | R$29,287.00 | 6/1/2025 | Ativa | Substituição de Disjuntor Superado 12C1, autorizada pela REA 1814/2009. Incluído no reajuste ciclo 2013-2014 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE MILLENIUM 02C1 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 1/15/2016 | 1/17/2046 | R$8,786.04 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE LT 69 kV PITUACU /COTEGIPE C-2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE LT 69 kV PITUACU /COTEGIPE C-2 BA | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 8/11/2013 | 9/7/2046 | R$31,280.58 | 6/1/2025 | Ativa | Substituição de Disjuntor Superado 12C5. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE LT 69 kV PITUACU /COTEGIPE C-2 BA | DIT | 061/2001 | IPCA | RCDM | REA 2376/2010 | 8/11/2013 | 6/2/2046 | R$62,649.50 | 6/1/2025 | Ativa | Substituição da seccionadora 32C5-4/5/6. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE LT 69 kV PITUACU /COTEGIPE C-2 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/12/2013 | 4/16/2042 | R$32,022.95 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE LT 69 kV PITUACU /COTEGIPE C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-2 BA | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 1/30/2013 | 1/29/2046 | R$29,287.00 | 6/1/2025 | Ativa | Substituição de Disjuntor Superado 12J6, autorizada pela REA 1814/2009. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-2 BA | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 1/26/2016 | 1/28/2046 | R$6,596.08 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-1 BA | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 1/30/2013 | 1/29/2046 | R$29,287.00 | 6/1/2025 | Ativa | Substituição de Disjuntor Superado 12J5, autorizada pela REA 1814/2009. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-1 BA | DIT | 061/2001 | IPCA | RCDM | REA 2376/2010 | 2/28/2014 | 11/21/2046 | R$43,657.58 | 6/1/2025 | Ativa | Substituição da seccionadora 32J2-4 / Substituição da seccionadora 32J2-6. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-1 BA | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 1/25/2016 | 1/27/2046 | R$8,793.99 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE -L.FREITAS 02J7 | DIT | 061/2001 | IPCA | RCDM | REN 1020/2022 | 11/19/2023 | 11/18/2051 | R$614,779.86 | 6/1/2025 | Ativa | Instalar um módulo de entrada de linha de 69 kV, arranjo BPT, com destino à SE Lauro de Freitas na SE Cotegipe. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2025 - 2026 | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE EMBASA 02L3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE EMBASA 02L3 | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 6/13/2013 | 7/10/2046 | R$31,117.02 | 6/1/2025 | Ativa | Substituição de Disjuntor Superado 12L3. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE CIM-ARATU 02L1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE CIM-ARATU 02L1 | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 4/14/2013 | 5/11/2046 | R$30,950.69 | 6/1/2025 | Ativa | Substituição de Disjuntor Superado 12L1. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE CIM-ARATU 02L1 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 2/3/2016 | 2/5/2046 | R$8,722.65 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE CIM-ARATU 02L1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/15/2013 | 12/18/2041 | R$31,628.38 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE CIA II 02L8 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE CIA II 02L8 | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 10/25/2013 | 11/21/2046 | R$31,488.50 | 6/1/2025 | Ativa | Substituição de Disjuntor Superado 12L8. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE CIA II 02L8 | DIT | 061/2001 | IPCA | RCDM | REA 2376/2010 | 10/28/2013 | 3/6/2046 | R$90,433.70 | 6/1/2025 | Ativa | Substituição da seccionadora 32L8-4/5/6 / Substituição dos TCs 92L8-A, 92L8-B, 92L8-C. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE CIA II 02L7 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE CIA II 02L7 | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 9/19/2013 | 10/16/2046 | R$31,388.70 | 6/1/2025 | Ativa | Substituição de Disjuntor Superado 12L7. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE CIA II 02L7 | DIT | 061/2001 | IPCA | RCDM | REA 2376/2010 | 9/19/2013 | 7/11/2046 | R$62,867.94 | 6/1/2025 | Ativa | Substituição da seccionadora 32L7-4/5/6. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE CIA II 02L7 | DIT | 061/2001 | IPCA | RCDM | REA 2376/2010 | 9/19/2013 | 1/26/2045 | R$27,247.87 | 6/1/2025 | Ativa | Substituição dos TCs 92L7-A, 92L7-B, 92L7-C. incluído no reajuste ciclo 2014-2015. RAP ativada no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE CIA I 02C9 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE CIA I 02C9 | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 12/14/2013 | 1/10/2047 | R$31,627.11 | 6/1/2025 | Ativa | Substituição de Disjuntor Superado 12C9. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE CIA I 02C9 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 12/14/2013 | 10/5/2046 | R$63,349.65 | 6/1/2025 | Ativa | Substituição das chaves seccionadoras 69 kV associadas ao disjuntor 12C9. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE CIA I 02C9 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/15/2013 | 12/14/2037 | R$5,862.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE CIA I 02C6 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE CIA I 02C6 | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 10/15/2013 | 11/11/2046 | R$31,460.77 | 6/1/2025 | Ativa | Substituição de Disjuntor Superado 12C6. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE CIA I 02C6 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 10/15/2013 | 8/6/2046 | R$63,013.58 | 6/1/2025 | Ativa | Substituição das chaves seccionadoras 69 kV associadas ao disjuntor 12C6. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE CIA I 02C6 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 10/15/2013 | 2/16/2045 | R$27,198.94 | 6/1/2025 | Ativa | Substituição dos TCs de Proteção 69 kV associados ao disjuntor 12C6. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE CIA I 02C6 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/16/2013 | 10/15/2037 | R$5,818.74 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE CAMACARI I 02J4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE CAMACARI I 02J4 | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 1/30/2013 | 1/29/2046 | R$29,287.00 | 6/1/2025 | Ativa | Substituição de Disjuntor Superado 12J4, autorizada pela REA 1814/2009. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE CAMACARI I 02J4 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 1/22/2016 | 1/24/2046 | R$8,791.61 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE CAMACARI I 02J3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE CAMACARI I 02J3 | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 1/30/2013 | 1/29/2046 | R$29,287.00 | 6/1/2025 | Ativa | Substituição de Disjuntor Superado 12J3, autorizada pela REA 1814/2009. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 69 kV COTEGIPE CAMACARI I 02J3 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 1/21/2016 | 1/23/2046 | R$8,790.81 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 230 kV COTEGIPE LT 230 kV COTEGIPE /USIBA C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 230 kV COTEGIPE LT 230 kV COTEGIPE /USIBA C-1 BA | DIT | 061/2001 | IPCA | RCDM | REA 2837/2011 | 12/27/2013 | 4/11/2046 | R$178,234.21 | 6/1/2025 | Ativa | Substituição da seccionadora 34L1-6 /Substituição do disjuntor 14L1 / Substituição dos TCs 94L1-A, 94L1-B e 94L1-C. Incluído no reajuste ciclo 2014-2015. RAP ativada no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 230 kV COTEGIPE LT 230 kV COTEGIPE /USIBA C-1 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/9/2020 | 11/27/2042 | R$94,626.01 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 230 kV COTEGIPE LT 230 kV COTEGIPE /SIBRA C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 230 kV COTEGIPE LT 230 kV COTEGIPE /SIBRA C-1 BA | DIT | 061/2001 | IPCA | RCDM | REA 2837/2011 | 9/23/2013 | 12/6/2044 | R$48,290.94 | 6/1/2025 | Ativa | Substituição dos TCs 94L2-A, 94L2-B e 94L2-C. Incluído no reajuste ciclo 2014-2015. RAP ativada no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 230 kV COTEGIPE LT 230 kV COTEGIPE /SIBRA C-1 BA | DIT | 061/2001 | IPCA | RCDM | REA 2837/2011 | 9/26/2013 | 9/25/2046 | R$85,290.33 | 6/1/2025 | Ativa | Substituição do disjuntor 14L2. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 230 kV COTEGIPE LT 230 kV COTEGIPE /SIBRA C-1 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/15/2020 | 3/9/2043 | R$86,872.05 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | COTEGIPE | EL 230 kV COTEGIPE LT 230 kV COTEGIPE /MATATU C-1 BA | RB | FT LT 230 kV COTEGIPE /MATATU C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COTEGIPE | EL 230 kV COTEGIPE LT 230 kV COTEGIPE /MATATU C-1 BA | RB | FT LT 230 kV COTEGIPE /MATATU C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/11/2022 | 12/6/2044 | R$494,255.39 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | COTEGIPE | EL 230 kV COTEGIPE LT 230 kV COTEGIPE /JACARACANGA C-1 BA | RB | FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COTEGIPE | EL 230 kV COTEGIPE LT 230 kV COTEGIPE /JACARACANGA C-1 BA | RB | FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/1/2020 | 2/23/2046 | R$221,471.08 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | COTEGIPE | EL 230 kV COTEGIPE LT 230 kV CAMACARI IV /COTEGIPE C-1 BA | RB | FT LT 230 kV CAMACARI IV /COTEGIPE C-1 BA | 061/2001 | IPCA | RBNI | REA 2891/2011 | 6/2/2014 | 12/2/2040 | R$76,828.59 | 6/1/2025 | Ativa | T2010-038 | Adequar a proteção da EL da LT 230 kV Camaçari II/Cotegipe- C1, devido ao remanejamento da linha para Camaçari IV *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | COTEGIPE | EL 230 kV COTEGIPE LT 230 kV CAMACARI IV /COTEGIPE C-1 BA | RB | FT LT 230 kV CAMACARI IV /COTEGIPE C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COTEGIPE | EL 230 kV COTEGIPE LT 230 kV CAMACARI IV /COTEGIPE C-1 BA | RB | FT LT 230 kV CAMACARI IV /COTEGIPE C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/19/2021 | 5/26/2049 | R$275,813.72 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | COTEGIPE | EL 230 kV COTEGIPE LT 230 kV CAMACARI II /COTEGIPE C-1 BA | RB | FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COTEGIPE | EL 230 kV COTEGIPE LT 230 kV CAMACARI II /COTEGIPE C-1 BA | RB | FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA | 061/2001 | IPCA | RBNI | REA 6258/2017 | 11/27/2020 | 12/26/2050 | R$215,558.02 | 6/1/2025 | Ativa | T2016-097 | Substituição de chaves e TCs para Recapacitação da LT 230 kV Camaçari II - Cotegipe *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | COTEGIPE | EL 230 kV COTEGIPE LT 230 kV CAMACARI II /COTEGIPE C-1 BA | RB | FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/5/2021 | 10/4/2049 | R$283,766.73 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | COTEGIPE | EL 230 kV COTEGIPE LT 230 kV CAMACARI II /COTEGIPE C-1 BA | RB | FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA | 061/2001 | IPCA | RBNI | REA 6258/2017 | 12/8/2019 | 3/28/2047 | R$52,534.58 | 6/1/2025 | Ativa | Substituição de 3 chaves seccionadoras e 3 transformadores de corrente no módulo de entrada da LT 230 kV Camaçari II – Cotegipe na SE Cotegipe Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | COTEGIPE | BC 69 kV 27,1 Mvar COTEGIPE BC2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$129,156.00 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COTEGIPE | BC 69 kV 21,3 Mvar COTEGIPE BC1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$107,937.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | COTEMINAS | MG 230 kV COTEMINAS MG1 PB | RB | FT MG 230 kV COTEMINAS MG1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,348.52 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COTEMINAS | MG 230 kV COTEMINAS MG1 PB | RB | FT MG 230 kV COTEMINAS MG1 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/30/2020 | 2/2/2038 | R$212,888.47 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | COTEMINAS | IB 230 kV MG 230 kV COTEMINAS MG1 PB IB1 | RB | FT MG 230 kV COTEMINAS MG1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,085.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COTEMINAS | EL 230 kV COTEMINAS LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE | RB | FT LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COTEMINAS | EL 230 kV COTEMINAS LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE | RB | FT LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2019 | 12/30/2034 | R$5,768.03 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | COTEMINAS | EL 230 kV COTEMINAS LT 230 kV C.GRANDE II /COTEMINAS C-1 PB | RB | FT LT 230 kV C.GRANDE II /COTEMINAS C-1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | COTEMINAS | EL 230 kV COTEMINAS LT 230 kV C.GRANDE II /COTEMINAS C-1 PB | RB | FT LT 230 kV C.GRANDE II /COTEMINAS C-1 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2019 | 12/30/2034 | R$7,812.81 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COXIPO | TT 13,8/0 kV COXIPO TT1 MT | RB | FT CE 70/-50 MvAr COXIPO CE1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$105,427.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | TR 230/138 kV COXIPO TRR2 MT | RBF | FT TR 230/138 kV COXIPO TRR2 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$216,606.99 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | TR 230/138 kV COXIPO TRR2 MT | RBF | FT TR 230/138 kV COXIPO TRR2 MT | 058/2001 | IPCA | RBNI | REA 8161/2019 | 9/13/2019 | 12/31/2042 | R$93,543.42 | 6/1/2025 | Ativa | T2019-063 | Parcela adicional de RAP para operação e manutenção de Reserva para os transformadores monofásicos da SE Coxipó TR4 e TR5, reutilizando a fase desmobilizada devido a REA 5.569/2015. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | COXIPO | TR 230/138 kV COXIPO TRR1 MT | RBF | FT TR 230/138 kV COXIPO TRR1 MT | 058/2001 | IPCA | RBNI | REA 5569/2015 | 7/22/2019 | 4/19/2054 | R$ 2,693,126.19 | 6/1/2025 | Ativa | T2015-045 | Obra de Substituição Completa - Instalar um Autotransformador 230/138 kV - 150 MVA - TRR1 RESERVA com comutador e terciário, e desmontagem do Banco de Autotransformadores TRR1 existente *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | COXIPO | TR 230/138 kV COXIPO TR5 MT | RBF | FT TR 230/138 kV COXIPO TR5 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$649,846.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | TR 230/138 kV COXIPO TR4 MT | RBF | FT TR 230/138 kV COXIPO TR4 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$649,846.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | TR 230/138 kV COXIPO TR3 MT | RBF | FT TR 230/138 kV COXIPO TR3 MT | 058/2001 | IPCA | RBNI | REA 5569/2015 | 10/1/2018 | 2/10/2053 | R$ 2,646,469.30 | 6/1/2025 | Ativa | T2015-044 | Obra de Substituição Completa - Instalar um Autotransformador 230/138 kV - 150 MVA - TR3 com comutador e terciário, em substituição ao Banco de Autotransformadores TR2 existente *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | COXIPO | TR 230/138 kV COXIPO TR3 MT | RBF | FT TR 230/138 kV COXIPO TR3 MT | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 12/19/2016 | 12/18/2031 | R$30,229.38 | 6/1/2025 | Ativa | Implantacao de sistema de medicao e monitoramento online de Buchas Condensivas do equipamento CXAT603 para integrar ao SISTEMA DE SUPERVISAO SAGE Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COXIPO | TR 230/138 kV COXIPO TR2 MT | RBF | FT TR 230/138 kV COXIPO TR2 MT | 058/2001 | IPCA | RBNI | REA 5569/2015 | 5/28/2018 | 1/6/2053 | R$ 2,624,556.02 | 6/1/2025 | Ativa | T2015-043 | Obra de Substituição Completa - Instalar um Autotransformador 230/138 kV - 150 MVA - TR2 com comutador e terciário, em substituição do Banco de Autotransformadores TR2 existente *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | COXIPO | TR 230/138 kV COXIPO TR2 MT | RBF | FT TR 230/138 kV COXIPO TR2 MT | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 12/19/2016 | 12/18/2031 | R$30,229.38 | 6/1/2025 | Ativa | Implantacao de sistema de medicao e monitoramento online de Buchas Condensivas do equipamento CXAT602 para integrar ao SISTEMA DE SUPERVISAO SAGE Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COXIPO | TR 230/138 kV COXIPO TR1 MT | RBF | FT TR 230/138 kV COXIPO TR1 MT | 058/2001 | IPCA | RBNI | REA 5569/2015 | 12/11/2017 | 7/22/2051 | R$ 1,876,303.58 | 6/1/2025 | Ativa | T2015-042 | Obra de Substituição Completa - Instalar um Autotransformador 230/138 kV - 150 MVA - AT1 com comutador e terciário. O Banco de autotransformadores existentes será desmobilizado na terceira fase da obra. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | COXIPO | TR 230/12,3 kV COXIPO TF1 MT | RB | FT CE 70/-50 MvAr COXIPO CE1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$356,021.09 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | TR 230/12,3 kV COXIPO TF1 MT | RB | FT CE 70/-50 MvAr COXIPO CE1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$772,894.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | TR 230/12,3 kV COXIPO TF1 MT | RB | FT CE 70/-50 MvAr COXIPO CE1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$741,280.94 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | RTL 230 kV 30 Mvar COXIPO RT2 MT | RB | FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$344,016.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | RTL 230 kV 30 Mvar COXIPO RT2 MT | RB | FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT | 058/2001 | IPCA | RMELP | REA 14780/2023 | R$ 1,226,588.47 | 6/1/2025 | Prevista | T2023-076 | Obra de Substituição Completa - Substituição do Reator 230kV 30MVAr número 2 da SE Coxipó - CXRE6-02. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 0001384/2022. | ||||
| AXIA Energia Norte | COXIPO | RTL 230 kV 30 Mvar COXIPO RT2 MT | RB | FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 9/12/2018 | 3/13/2042 | R$166,847.26 | 6/1/2025 | Ativa | CONSTRUCAO e AMPLIACAO GALPAO P RESIDUOS PERIGOSOS TAM 645 MCOM SERVICOS DE OBRAS CIVIS E COBERTURA C TELHAS ISOLACAO TERMICA PERFIL TRAPEZOIDAL MED 30X70X1000mm ACO SUPERIOR E INFERIOR E OUTRA PARTE A COBERTURA TAM 240 MTELHA CIMENTO AMIANTO ONDA 50 Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COXIPO | RTL 230 kV 30 Mvar COXIPO RT2 MT | RB | FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 12/31/2013 | 12/30/2028 | R$26,422.72 | 6/1/2025 | Ativa | IMPLANTACAO DEMONITOR DE BUCHAS P AUTOTRAFO TRAFO E REATORESTENSAO 230KV Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COXIPO | RTL 230 kV 30 Mvar COXIPO RT1 MT | RB | FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$431,052.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | RTL 230 kV 30 Mvar COXIPO RT1 MT | RB | FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$935,781.89 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | RTL 230 kV 30 Mvar COXIPO RT1 MT | RB | FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT | 058/2001 | IPCA | RMELP | REA 14780/2023 | R$ 1,226,588.47 | 6/1/2025 | Prevista | T2023-075 | Obra de Substituição Completa - Substituição do Reator 230kV 30MVAr número 1 da SE Coxipó - CXRE6-01. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 0001385/2022. | ||||
| AXIA Energia Norte | COXIPO | RTL 230 kV 30 Mvar COXIPO RT1 MT | RB | FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 12/31/2013 | 12/30/2028 | R$15,136.41 | 6/1/2025 | Ativa | IMPLANTACAO DEMONITOR DE BUCHAS P AUTOTRAFO TRAFO E REATORESTENSAO 230KV Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COXIPO | RTL 138 kV 5 Mvar COXIPO RT2 MT | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$149,437.11 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | COXIPO | RTL 138 kV 5 Mvar COXIPO RT2 MT | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$324,416.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | COXIPO | RTL 138 kV 5 Mvar COXIPO RT1 MT | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$149,437.11 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | COXIPO | RTL 138 kV 5 Mvar COXIPO RT1 MT | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$324,416.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | COXIPO | MG 230 kV COXIPO MG1 MT | RB | FT MG 230 kV COXIPO MG1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$965,107.21 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | MG 230 kV COXIPO MG1 MT | RB | FT MG 230 kV COXIPO MG1 MT | 058/2001 | IPCA | RBNI | REA 5569/2015 | 12/11/2017 | 7/17/2046 | R$194,545.48 | 6/1/2025 | Ativa | T2015-042 | Instalar Módulo de Infraestrutura de manobra, correspondente ao CT 230 kV do TR1. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | COXIPO | MG 230 kV COXIPO MG1 MT | RB | FT MG 230 kV COXIPO MG1 MT | 058/2001 | IPCA | RBNI | REA 5569/2015 | 12/11/2017 | 7/17/2046 | R$124,763.54 | 6/1/2025 | Ativa | T2015-042 | Instalar Módulo de Infraestrutura de manobra, correspondente ao CT 138 kV do AT1. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | COXIPO | MG 230 kV COXIPO MG1 MT | RB | FT MG 230 kV COXIPO MG1 MT | 058/2001 | IPCA | RBNI | REA 8348/2019 | 2/15/2022 | 11/6/2050 | R$423,877.18 | 6/1/2025 | Ativa | T2019-028 | Modulo de Infra estrutura de manobra (138 kV- BD4) na SE Coxipó para instalação de 3 Bancos de Capacitores em Derivação 138 kV. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | COXIPO | MG 230 kV COXIPO MG1 MT | RB | FT MG 230 kV COXIPO MG1 MT | 058/2001 | IPCA | RBNI | DSP 1422/2021 | 1/26/2022 | 1/29/2052 | R$16,913.62 | 6/1/2025 | Ativa | Substituição de 1 Transformador de serviços auxiliar de 300 kVA (CXTF2-02) Capacidade do novo equi-pamento: Capacidade nominal de curto-circuito (kA): 15 kA, Capacidade nominal de corrente (A): 760 A. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | COXIPO | MG 230 kV COXIPO MG1 MT | RB | FT MG 230 kV COXIPO MG1 MT | 058/2001 | IPCA | RBNI | DSP 1422/2021 | 1/25/2022 | 1/28/2052 | R$16,912.35 | 6/1/2025 | Ativa | Substituição de 1 Transformador de serviços auxiliar de 300 kVA (CXTF2-03) Capacidade do novo equipamento: Capacidade nominal de curto-circuito (kA): 15 kA, Capacidade nominal de corrente (A): 760 A. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | COXIPO | MG 230 kV COXIPO MG1 MT | RB | FT MG 230 kV COXIPO MG1 MT | 058/2001 | IPCA | RBNI | DSP 1422/2021 | 1/27/2022 | 1/26/2050 | R$127,374.76 | 6/1/2025 | Ativa | Substituição de 1 Quadro de serviço auxilar (QSACA) com capacidade de 600 A. Capacidade do novo equipamento: Capacidade nominal de curto-circuito (kA): 15 kA, Capacidade nominal de corrente (A): 760 A. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | COXIPO | MG 230 kV COXIPO MG1 MT | RB | FT MG 230 kV COXIPO MG1 MT | 058/2001 | IPCA | RMEL | REN 905/2020 | 2/27/2015 | 5/12/2039 | R$298,655.53 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COXIPO | MG 230 kV COXIPO MG1 MT | RB | FT MG 230 kV COXIPO MG1 MT | 058/2001 | IPCA | RBNI | REN 905/2020 | 9/13/2012 | 9/12/2029 | R$22,952.38 | 6/1/2025 | Ativa | Melhorias dos servicos auxiliares das SEs em funcao da obsolescencia dos equipamentos e risco de danos as instalacoes Foram trocados retificadores instalados disjuntores motorizados trocados transdutores e implantado sistema de supervisao controle e automacao dos servicos auxiliares das SEs para melhorar o desempenho manutencao e a confiabilidade dos mesmos Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COXIPO | MG 230 kV COXIPO MG1 MT | RB | FT MG 230 kV COXIPO MG1 MT | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 6/28/2012 | 6/27/2027 | R$13,315.03 | 6/1/2025 | Ativa | Instalacao SISTEMA DE COMUNICACAO LOCAL ESTRUTURADA COMPUTADORES E TELEFONIA Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COXIPO | MG 230 kV COXIPO MG1 MT | RB | FT MG 230 kV COXIPO MG1 MT | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 8/7/2014 | 8/6/2039 | R$85,638.36 | 6/1/2025 | Ativa | IMPLANTACAO DE SISTEMA DE DETECCAO E ALARME CONTRA INCENDIO Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COXIPO | MC 230 kV TR 230/138 kV COXIPO TR5 MT | RBF | FT TR 230/138 kV COXIPO TR5 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$183,181.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | MC 230 kV TR 230/138 kV COXIPO TR5 MT | RBF | FT TR 230/138 kV COXIPO TR5 MT | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/4/2013 | 11/7/2043 | R$1,505.78 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COXIPO | MC 230 kV TR 230/138 kV COXIPO TR4 MT | RBF | FT TR 230/138 kV COXIPO TR4 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$183,181.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | MC 230 kV TR 230/138 kV COXIPO TR3 MT | RBF | FT TR 230/138 kV COXIPO TR3 MT | 058/2001 | IPCA | RBNI | REA 5569/2015 | 10/1/2018 | 8/10/2049 | R$ 1,090,089.76 | 6/1/2025 | Ativa | T2015-044 | Obra de Substituição Completa - Instalar o CT 230kV para o Autotransformador TR3 230/138 kV - 150 MVA, com a substituição do disjuntor, chaves seccionadoras, 3 TC, 1 TP, 1 Pararraios, isoladores, proteção e controle, cabos de controle e potencia, estruturas e suportes e obras civis. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | COXIPO | MC 230 kV TR 230/138 kV COXIPO TR2 MT | RBF | FT TR 230/138 kV COXIPO TR2 MT | 058/2001 | IPCA | RBNI | REA 5569/2015 | 5/28/2018 | 4/13/2049 | R$ 1,080,508.21 | 6/1/2025 | Ativa | T2015-043 | Obra de Substituição Completa - Instalar o CT 230kV para o Autotransformador TR2 230/138 kV - 150 MVA, com a substituição do disjuntor, chaves seccionadoras, 3 TC, 1 TP, 1 Pararraios, isoladores, proteção e controle, cabos de controle e potencia, estruturas e suportes e obras civis. Desmontagem do CT 230 kV existente. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | COXIPO | MC 230 kV TR 230/138 kV COXIPO TR1 MT | RBF | FT TR 230/138 kV COXIPO TR1 MT | 058/2001 | IPCA | RBNI | REA 5569/2015 | 12/11/2017 | 6/16/2048 | R$ 1,177,678.55 | 6/1/2025 | Ativa | T2015-042 | Obra de Substituição Completa - Instalar um módulo de conexão de transformador 230 kV, arranjo BD5, para o TR1. O módulo de conexão existente será desativado na fase 3. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | COXIPO | MC 230 kV TR 230/12,3 kV COXIPO TF1 MT | RB | FT CE 70/-50 MvAr COXIPO CE1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$183,181.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | MC 230 kV TR 230/12,3 kV COXIPO TF1 MT | RB | FT CE 70/-50 MvAr COXIPO CE1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$397,673.32 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | MC 230 kV TR 230/12,3 kV COXIPO TF1 MT | RB | FT CE 70/-50 MvAr COXIPO CE1 MT | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/23/2020 | 11/26/2050 | R$25,856.33 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COXIPO | MC 230 kV RTL 230 kV 30 Mvar COXIPO RT2 MT | RB | FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$109,485.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | MC 230 kV RTL 230 kV 30 Mvar COXIPO RT1 MT | RB | FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$109,485.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | MC 138 kV TR 230/138 kV COXIPO TR5 MT | RBF | FT TR 230/138 kV COXIPO TR5 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$144,373.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | MC 138 kV TR 230/138 kV COXIPO TR4 MT | RBF | FT TR 230/138 kV COXIPO TR4 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$144,373.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | MC 138 kV TR 230/138 kV COXIPO TR4 MT | RBF | FT TR 230/138 kV COXIPO TR4 MT | 058/2001 | IPCA | RBNI | REA 5569/2015 | 4/9/2018 | 4/8/2051 | R$83,650.67 | 6/1/2025 | Ativa | T2015-054 | Substituir de 1 disjuntor de conexão de transformador 138 kV do TR4. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | COXIPO | MC 138 kV TR 230/138 kV COXIPO TR3 MT | RBF | FT TR 230/138 kV COXIPO TR3 MT | 058/2001 | IPCA | RBNI | REA 5569/2015 | 10/1/2018 | 10/9/2049 | R$ 1,225,548.14 | 6/1/2025 | Ativa | T2015-044 | Obra de Substituição Completa - Instalar o CT 138 kV para o Autotransformador TR3 230/138 kV - 150 MVA, com a substituição do disjuntor, chaves seccionadoras, 3 TC, 1 TP, 1 Pararraios, isoladores, proteção e controle, cabos de controle e potencia, estruturas e suportes e obras civis. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | COXIPO | MC 138 kV TR 230/138 kV COXIPO TR2 MT | RBF | FT TR 230/138 kV COXIPO TR2 MT | 058/2001 | IPCA | RBNI | REA 5569/2015 | 5/28/2018 | 11/27/2048 | R$802,436.62 | 6/1/2025 | Ativa | T2015-043 | Obra de Substituição Completa - Instalar o CT 138kV para o Autotransformador TR2 230/138 kV - 150 MVA, com a substituição do disjuntor, chaves seccionadoras, 3 TC, 1 TP, 1 Pararraios, isoladores, proteção e controle, cabos de controle e potencia, estruturas e suportes e obras civis. Desmontagem do CT 138 kV existente. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | COXIPO | MC 138 kV TR 230/138 kV COXIPO TR1 MT | RBF | FT TR 230/138 kV COXIPO TR1 MT | 058/2001 | IPCA | RBNI | REA 5569/2015 | 12/11/2017 | 10/19/2048 | R$930,936.16 | 6/1/2025 | Ativa | T2015-042 | Obra de Substituição Completa - Instalar um módulo de conexão de transformador 138 kV, arranjo BD5, para o TR1, com 1 TP e 1 pararraios. O módulo existente será desativado. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | COXIPO | MC 138 kV TR 230/138 kV COXIPO TR1 MT | RBF | FT TR 230/138 kV COXIPO TR1 MT | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/23/2020 | 11/26/2050 | R$26,938.89 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COXIPO | MC 138 kV RTL 138 kV 5 Mvar COXIPO RT2 MT | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$82,302.56 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | COXIPO | MC 138 kV RTL 138 kV 5 Mvar COXIPO RT1 MT | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$82,302.56 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | COXIPO | MC 138 kV BC 138 kV 35 Mvar COXIPO BCD3 MT | DIT | 058/2001 | IPCA | RCDM | REA 8348/2019 | 2/15/2022 | 10/7/2053 | R$ 1,247,863.21 | 6/1/2025 | Ativa | T2019-028 | Instalação de Módulo de Conexão para Banco de Capacitor em Derivação 138 kV- 35 Mvar na SE Coxipo - BCD3 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | COXIPO | MC 138 kV BC 138 kV 35 Mvar COXIPO BCD3 MT | DIT | 058/2001 | IPCA | RCDM | DSP 1107/2021 | 1/25/2022 | 1/28/2052 | R$17,955.42 | 6/1/2025 | Ativa | AQUISICAO DE TRANSFORMADOR DE POTENCIA TP FASE A 138KV Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | COXIPO | MC 138 kV BC 138 kV 35 Mvar COXIPO BCD3 MT | DIT | 058/2001 | IPCA | RCDM | DSP 1107/2021 | 1/25/2022 | 1/28/2052 | R$17,955.42 | 6/1/2025 | Ativa | AQUISICAO DE TRANSFORMADOR DE POTENCIAL TP FASE B 138KV Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | COXIPO | MC 138 kV BC 138 kV 35 Mvar COXIPO BCD3 MT | DIT | 058/2001 | IPCA | RCDM | DSP 1107/2021 | 1/25/2022 | 1/28/2052 | R$17,955.42 | 6/1/2025 | Ativa | AQUISICAO DE TRANSFORMADOR DE POTENCIAL TP FASE C 138KV Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | COXIPO | MC 138 kV BC 138 kV 35 Mvar COXIPO BCD2 MT | DIT | 058/2001 | IPCA | RCDM | REA 8348/2019 | 2/15/2022 | 9/26/2053 | R$ 1,248,023.88 | 6/1/2025 | Ativa | T2019-028 | Instalação de Módulo de Conexão para Banco de Capacitor em Derivação 138 kV- 35 Mvar na SE Coxipo - BCD2 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | COXIPO | MC 138 kV BC 138 kV 35 Mvar COXIPO BCD2 MT | DIT | 058/2001 | IPCA | RCDM | DSP 1107/2021 | 1/25/2022 | 3/4/2052 | R$18,965.15 | 6/1/2025 | Ativa | AQUISICAO DE TRANSFORMADOR DE POTENCIA TP FASE A 138KV Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | COXIPO | MC 138 kV BC 138 kV 35 Mvar COXIPO BCD2 MT | DIT | 058/2001 | IPCA | RCDM | DSP 1107/2021 | 1/25/2022 | 3/4/2052 | R$18,965.15 | 6/1/2025 | Ativa | AQUISICAO DE TRANSFORMADOR DE POTENCIA TP FASE B 138KV Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | COXIPO | MC 138 kV BC 138 kV 35 Mvar COXIPO BCD2 MT | DIT | 058/2001 | IPCA | RCDM | DSP 1107/2021 | 1/25/2022 | 3/4/2052 | R$18,965.15 | 6/1/2025 | Ativa | AQUISICAO DE TRANSFORMADOR DE POTENCIAL TP FASE B 138KV Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | COXIPO | MC 138 kV BC 138 kV 35 Mvar COXIPO BCD1 MT | DIT | 058/2001 | IPCA | RCDM | REA 8348/2019 | 2/15/2022 | 8/10/2053 | R$ 1,248,720.05 | 6/1/2025 | Ativa | T2019-028 | Instalação de Módulo de Conexão para Banco de Capacitor em Derivação 138 kV- 35 Mvar na SE Coxipo *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | COXIPO | MC 138 kV BC 138 kV 35 Mvar COXIPO BCD1 MT | DIT | 058/2001 | IPCA | RCDM | DSP 1107/2021 | 1/25/2022 | 1/28/2052 | R$17,955.42 | 6/1/2025 | Ativa | AQUISICAO DE TRANSFORMADOR DE POTENCIA TP FASE A 138KV Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | COXIPO | MC 138 kV BC 138 kV 35 Mvar COXIPO BCD1 MT | DIT | 058/2001 | IPCA | RCDM | DSP 1107/2021 | 1/25/2022 | 1/28/2052 | R$17,955.42 | 6/1/2025 | Ativa | AQUISICAO DE TRANSFORMADOR DE POTENCIAL TP FASE B 138KV Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | COXIPO | MC 138 kV BC 138 kV 35 Mvar COXIPO BCD1 MT | DIT | 058/2001 | IPCA | RCDM | DSP 1107/2021 | 1/25/2022 | 1/28/2052 | R$17,955.42 | 6/1/2025 | Ativa | AQUISICAO DE TRANSFORMADOR DE POTENCIAL TP FASE C 138KV Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | COXIPO | MC 13,8 kV TT 13,8/0 kV COXIPO TT1 MT | RB | FT CE 70/-50 MvAr COXIPO CE1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$31,250.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | MC 13,8 kV BC 13,8 kV 9,6 Mvar COXIPO BC9 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC9 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$86,096.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | MC 13,8 kV BC 13,8 kV 9,6 Mvar COXIPO BC9 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC9 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$186,908.94 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | MC 13,8 kV BC 13,8 kV 9,6 Mvar COXIPO BC8 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC8 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$86,096.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | MC 13,8 kV BC 13,8 kV 9,6 Mvar COXIPO BC8 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC8 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$186,908.94 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | MC 13,8 kV BC 13,8 kV 9,6 Mvar COXIPO BC7 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC7 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$86,096.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | MC 13,8 kV BC 13,8 kV 9,6 Mvar COXIPO BC7 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC7 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$186,908.94 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | MC 13,8 kV BC 13,8 kV 9,6 Mvar COXIPO BC6 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC6 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$86,096.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | MC 13,8 kV BC 13,8 kV 9,6 Mvar COXIPO BC5 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC5 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$86,096.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | MC 13,8 kV BC 13,8 kV 9,6 Mvar COXIPO BC4 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC4 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$86,096.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | MC 13,8 kV BC 13,8 kV 9,6 Mvar COXIPO BC3 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC3 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$86,096.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | MC 13,8 kV BC 13,8 kV 9,6 Mvar COXIPO BC2 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC2 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$86,096.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | MC 13,8 kV BC 13,8 kV 9,6 Mvar COXIPO BC1 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$86,096.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | IB 230 kV MG 230 kV COXIPO MG1 MT IB1 | RB | FT MG 230 kV COXIPO MG1 MT | 058/2001 | IPCA | RBNI | REA 5569/2015 | 11/22/2017 | 12/10/2048 | R$401,216.04 | 6/1/2025 | Ativa | T2015-042 | Adequar o IB 230 kV com a substituição de disjuntor, chaves seccionadoras, 3 TCs, isoladores, sistema de proteção e cabo de controle e potencia. Desmontagem do IB 230 kV existente. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | COXIPO | IB 138 kV MG 230 kV COXIPO MG1 MT IB1 | DIT | 058/2001 | IPCA | RCDM | REA 5569/2015 | 2/7/2018 | 4/2/2049 | R$464,169.24 | 6/1/2025 | Ativa | T2015-042 | Obra de Substituição Completa - Adequar o IB 138 kV com a substituição de disjuntor, chaves seccionadoras, 3 TCs, isoladores, sistema de proteção e cabo de controle e potencia. Desmontagem do IB 138 kV existente. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | COXIPO | IB 138 kV MG 230 kV COXIPO MG1 MT IB1 | DIT | 058/2001 | IPCA | RCDM | REA 5569/2015 | 2/7/2018 | 4/16/2057 | R$151,082.85 | 6/1/2025 | Ativa | T2015-042 | Recondutorar Barra 138 kV, entre os vãos H e L, correspondente a 5 Módulos de Manobra. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | COXIPO | EL 230 kV COXIPO LT 230 kV VARZEA GRANDE 2 /COXIPO C-2 MT | RB | FT LT 230 kV VARZEA GRANDE 2 /COXIPO C-2 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$260,258.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | EL 230 kV COXIPO LT 230 kV VARZEA GRANDE 2 /COXIPO C-2 MT | RB | FT LT 230 kV VARZEA GRANDE 2 /COXIPO C-2 MT | 058/2001 | IPCA | RBNI | REA 4967/2014 | 6/21/2016 | 6/20/2044 | R$142,109.67 | 6/1/2025 | Ativa | T2014-091 | Adequação, na SE Coxipó, do sistema de proteção, controle e supervisão do módulo de entrada de linha da nova LT 230 kV VARZEA GRANDE /COXIPO C-1 MT originado da seccionamento da LT 230 kV JAURU /COXIPO C-1 MT na SE VARZEA GRANDE. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | COXIPO | EL 230 kV COXIPO LT 230 kV VARZEA GRANDE 2 /COXIPO C-1 MT | RB | FT LT 230 kV VARZEA GRANDE 2 /COXIPO C-1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$260,258.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | EL 230 kV COXIPO LT 230 kV VARZEA GRANDE 2 /COXIPO C-1 MT | RB | FT LT 230 kV VARZEA GRANDE 2 /COXIPO C-1 MT | 058/2001 | IPCA | RMEL | REN 905/2020 | 12/29/2020 | 1/1/2051 | R$30,383.43 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COXIPO | EL 230 kV COXIPO LT 230 kV RONDONOPOLIS /COXIPO C-2 MT | RB | FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$260,258.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | EL 230 kV COXIPO LT 230 kV RONDONOPOLIS /COXIPO C-2 MT | RB | FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$565,000.48 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | EL 230 kV COXIPO LT 230 kV RONDONOPOLIS /COXIPO C-2 MT | RB | FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT | 058/2001 | IPCA | RMEL | REN 905/2020 | 5/23/2019 | 5/25/2049 | R$164,323.04 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COXIPO | EL 230 kV COXIPO LT 230 kV RONDONOPOLIS /COXIPO C-1 MT | RB | FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$260,258.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | EL 230 kV COXIPO LT 230 kV RONDONOPOLIS /COXIPO C-1 MT | RB | FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/24/2019 | 11/26/2049 | R$238,210.79 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COXIPO | EL 230 kV COXIPO LT 230 kV COXIPO /NOBRES C-1 MT | RB | FT LT 230 kV COXIPO /NOBRES C-1 MT | 058/2001 | IPCA | RBNI | REA 2384/2010 | 12/20/2012 | 2/5/2038 | R$76,590.87 | 6/1/2025 | Ativa | T2009-145 | Adequaçao na subestação Coxipó com a instalação de 3 TCs e duas bobinas de bloqueio no módulo de entrada de linha da LT 230 kV Coxipó - Nobres C1. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | COXIPO | EL 230 kV COXIPO LT 230 kV COXIPO /NOBRES C-1 MT | RB | FT LT 230 kV COXIPO /NOBRES C-1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$260,258.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | EL 230 kV COXIPO LT 230 kV COXIPO /NOBRES C-1 MT | RB | FT LT 230 kV COXIPO /NOBRES C-1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$565,000.48 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | EL 138 kV COXIPO DIST6 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$210,855.12 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | COXIPO | EL 138 kV COXIPO DIST6 | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$457,750.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | COXIPO | EL 138 kV COXIPO DIST6 | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$439,027.04 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | COXIPO | EL 138 kV COXIPO DIST5 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$210,855.12 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | COXIPO | EL 138 kV COXIPO DIST5 | DIT | 058/2001 | IPCA | RCDM | REA 5569/2015 | 2/6/2018 | 2/9/2048 | R$65,109.90 | 6/1/2025 | Ativa | T2015-054 | Substituir de 3 TC de entrada de linha 138 kV para Rondonópolis. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | COXIPO | EL 138 kV COXIPO DIST5 | DIT | 058/2001 | IPCA | RCDM | REA 8161/2019 | 9/13/2019 | 9/12/2047 | R$103,350.57 | 6/1/2025 | Ativa | T2019-063 | Implantação de proteção de retaguarda na entrada de linha em 138kV da SE Coxipó. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | COXIPO | EL 138 kV COXIPO DIST4 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$210,855.12 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | COXIPO | EL 138 kV COXIPO DIST4 | DIT | 058/2001 | IPCA | RCDM | REA 5569/2015 | 2/6/2018 | 2/5/2049 | R$153,336.92 | 6/1/2025 | Ativa | T2015-054 | Substituir de 5 chaves seccionadoras de entrada de linha 138 kV para CPA. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | COXIPO | EL 138 kV COXIPO DIST4 | DIT | 058/2001 | IPCA | RCDM | REA 5569/2015 | 2/6/2018 | 2/9/2048 | R$65,109.90 | 6/1/2025 | Ativa | T2015-054 | Substituir de 3 TC de entrada de linha 138 kV para CPA. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | COXIPO | EL 138 kV COXIPO DIST4 | DIT | 058/2001 | IPCA | RMEL | REN 443/2011 | 11/26/2017 | 4/19/2048 | R$11,947.17 | 6/1/2025 | Ativa | Substituição do transformador de corrente 138 kV CXTC5-CP FASE B da linha de interligação CPCX-LI5-01 da subestação Coxipó * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Norte | COXIPO | EL 138 kV COXIPO DIST4 | DIT | 058/2001 | IPCA | RMEL | REN 443/2011 | 11/26/2017 | 4/19/2048 | R$11,947.17 | 6/1/2025 | Ativa | Substituição do transformador de corrente 138 kV CXTC5-CP FASE V da linha de interligação CPCX-LI5-01 da subestação Coxipó. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Norte | COXIPO | EL 138 kV COXIPO DIST4 | DIT | 058/2001 | IPCA | RMEL | REN 443/2011 | 11/26/2017 | 4/19/2048 | R$11,947.17 | 6/1/2025 | Ativa | Substituição do transformador de corrente 138 kV CXTC5-CP FASE A da linha de interligação CPCX-LI5-01 da subestação Coxipó. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Norte | COXIPO | EL 138 kV COXIPO DIST4 | DIT | 058/2001 | IPCA | RCDM | REA 8161/2019 | 9/13/2019 | 9/12/2047 | R$103,350.57 | 6/1/2025 | Ativa | T2019-063 | Implantação de proteção de retaguarda na entrada de linha em 138kV da SE Coxipó. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | COXIPO | EL 138 kV COXIPO DIST4 | DIT | 058/2001 | IPCA | RMEL | REN 905/2020 | 4/20/2019 | 4/22/2049 | R$68,422.83 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | COXIPO | EL 138 kV COXIPO DIST3 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$210,855.12 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | COXIPO | EL 138 kV COXIPO DIST3 | DIT | 058/2001 | IPCA | RCDM | REA 5569/2015 | 2/6/2018 | 2/5/2049 | R$153,336.92 | 6/1/2025 | Ativa | T2015-054 | Substituir de 5 chaves seccionadoras de entrada de linha 138 kV para Cuiabá C1 (Barro Duro C1). *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | COXIPO | EL 138 kV COXIPO DIST3 | DIT | 058/2001 | IPCA | RCDM | REA 5569/2015 | 2/6/2018 | 2/9/2048 | R$65,109.90 | 6/1/2025 | Ativa | T2015-054 | Substituir de 3 TC de entrada de linha 138 kV para Cuiabá C1 (Barro Duro C1). *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | COXIPO | EL 138 kV COXIPO DIST3 | DIT | 058/2001 | IPCA | RCDM | REA 8161/2019 | 9/13/2019 | 9/12/2047 | R$103,350.57 | 6/1/2025 | Ativa | T2019-063 | Implantação de proteção de retaguarda na entrada de linha em 138kV da SE Coxipó. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | COXIPO | EL 138 kV COXIPO DIST2 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$210,855.12 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | COXIPO | EL 138 kV COXIPO DIST2 | DIT | 058/2001 | IPCA | RCDM | REA 5569/2015 | 2/6/2018 | 2/5/2049 | R$153,336.92 | 6/1/2025 | Ativa | T2015-054 | Substituir de 5 chaves seccionadoras de entrada de linha 138 kV para Cuiabá C2 (Barro Duro C2). *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | COXIPO | EL 138 kV COXIPO DIST2 | DIT | 058/2001 | IPCA | RCDM | REA 5569/2015 | 2/6/2018 | 2/9/2048 | R$65,109.90 | 6/1/2025 | Ativa | T2015-054 | Substituir de 3 TC de entrada de linha 138 kV para Cuiabá C1 (Barro Duro C1). *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | COXIPO | EL 138 kV COXIPO DIST2 | DIT | 058/2001 | IPCA | RCDM | REA 8161/2019 | 9/13/2019 | 9/12/2047 | R$103,350.57 | 6/1/2025 | Ativa | T2019-063 | Implantação de proteção de retaguarda na entrada de linha em 138kV da SE Coxipó. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | COXIPO | EL 138 kV COXIPO DIST1 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$210,855.12 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | COXIPO | EL 138 kV COXIPO DIST1 | DIT | 058/2001 | IPCA | RCDM | REA 5569/2015 | 2/6/2018 | 2/5/2049 | R$153,336.92 | 6/1/2025 | Ativa | T2015-054 | Substituição de 5 chaves seccionadoras de entrada de linha 138 kV para Varzea Grande. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | COXIPO | EL 138 kV COXIPO DIST1 | DIT | 058/2001 | IPCA | RCDM | REA 8161/2019 | 9/13/2019 | 9/12/2047 | R$103,350.57 | 6/1/2025 | Ativa | T2019-063 | Implantação de proteção de retaguarda na entrada de linha em 138kV da SE Coxipó. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | COXIPO | EL 138 kV COXIPO DIST1 | DIT | 058/2001 | IPCA | RMEL | REN 905/2020 | 2/18/2017 | 2/21/2047 | R$65,945.79 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | COXIPO | CE 70/-50 Mvar COXIPO CE1 MT | RB | FT CE 70/-50 MvAr COXIPO CE1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,178,335.49 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | CE 70/-50 Mvar COXIPO CE1 MT | RB | FT CE 70/-50 MvAr COXIPO CE1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,729,000.24 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | CE 70/-50 Mvar COXIPO CE1 MT | RB | FT CE 70/-50 MvAr COXIPO CE1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 4,535,570.04 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | CE 70/-50 Mvar COXIPO CE1 MT | RB | FT CE 70/-50 MvAr COXIPO CE1 MT | 058/2001 | IPCA | RMEL | REN 905/2020 | 10/4/2014 | 10/6/2044 | R$3,568.77 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COXIPO | BC 138 kV 35 Mvar COXIPO BCD3 MT | DIT | 058/2001 | IPCA | RCDM | REA 8348/2019 | 2/15/2022 | 6/27/2047 | R$386,731.07 | 6/1/2025 | Ativa | T2019-028 | SE Coxipó - Instalação de Banco de Capacitor em Derivação 35 Mvar - 138 kV *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | COXIPO | BC 138 kV 35 Mvar COXIPO BCD3 MT | DIT | 058/2001 | IPCA | RMEL | REN 905/2020 | 12/18/2020 | 12/17/2035 | R$18,337.35 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | COXIPO | BC 138 kV 35 Mvar COXIPO BCD2 MT | DIT | 058/2001 | IPCA | RCDM | REA 8348/2019 | 2/15/2022 | 6/27/2047 | R$386,731.07 | 6/1/2025 | Ativa | T2019-028 | SE Coxipó - Instalação de Banco de Capacitor em Derivação 35 Mvar - 138 kV *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | COXIPO | BC 138 kV 35 Mvar COXIPO BCD2 MT | DIT | 058/2001 | IPCA | RCDM | DSP 1107/2021 | 12/18/2020 | 12/17/2035 | R$27,506.02 | 6/1/2025 | Ativa | MODERNIZAÇÃO - RELE DE PROTECAO P/ BANCO CAPACITOR 13,8/230KV 5ASEL / 055100CX5X2X Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | COXIPO | BC 138 kV 35 Mvar COXIPO BCD1 MT | DIT | 058/2001 | IPCA | RCDM | REA 8348/2019 | 2/15/2022 | 2/14/2048 | R$385,221.66 | 6/1/2025 | Ativa | T2019-028 | SE Coxipó - Instalação de Banco de Capacitor em Derivação 35 Mvar - 138 kV *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | COXIPO | BC 138 kV 35 Mvar COXIPO BCD1 MT | DIT | 058/2001 | IPCA | RCDM | DSP 1107/2021 | 12/18/2020 | 12/17/2035 | R$22,921.69 | 6/1/2025 | Ativa | MODERNIZAÇÃO - RELE DE PROTECAO P/ BANCO CAPACITOR 13,8/230KV 5ASEL / 055100CX5X2X Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | COXIPO | BC 13,8 kV 9,6 Mvar COXIPO BC9 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC9 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,096.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | BC 13,8 kV 9,6 Mvar COXIPO BC9 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC9 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$136,977.85 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | BC 13,8 kV 9,6 Mvar COXIPO BC8 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC8 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,096.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | BC 13,8 kV 9,6 Mvar COXIPO BC8 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC8 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$136,977.85 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | BC 13,8 kV 9,6 Mvar COXIPO BC8 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC8 MT | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/16/2020 | 11/19/2050 | R$22,744.97 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COXIPO | BC 13,8 kV 9,6 Mvar COXIPO BC7 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC7 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,096.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | BC 13,8 kV 9,6 Mvar COXIPO BC7 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC7 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$136,977.85 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | BC 13,8 kV 9,6 Mvar COXIPO BC7 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC7 MT | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/16/2020 | 11/19/2050 | R$22,744.97 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COXIPO | BC 13,8 kV 9,6 Mvar COXIPO BC6 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC6 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,096.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | BC 13,8 kV 9,6 Mvar COXIPO BC6 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC6 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$136,977.85 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | BC 13,8 kV 9,6 Mvar COXIPO BC6 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC6 MT | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/16/2020 | 11/19/2050 | R$22,744.97 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COXIPO | BC 13,8 kV 9,6 Mvar COXIPO BC5 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC5 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,096.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | BC 13,8 kV 9,6 Mvar COXIPO BC5 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC5 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$136,977.85 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | BC 13,8 kV 9,6 Mvar COXIPO BC5 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC5 MT | 058/2001 | IPCA | RMEL | REN 905/2020 | 12/17/2020 | 12/20/2050 | R$22,800.02 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COXIPO | BC 13,8 kV 9,6 Mvar COXIPO BC4 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC4 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,096.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | BC 13,8 kV 9,6 Mvar COXIPO BC4 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC4 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$136,977.85 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | BC 13,8 kV 9,6 Mvar COXIPO BC4 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC4 MT | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/16/2020 | 11/19/2050 | R$22,744.97 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COXIPO | BC 13,8 kV 9,6 Mvar COXIPO BC3 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC3 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,096.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | BC 13,8 kV 9,6 Mvar COXIPO BC3 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC3 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$136,977.85 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | BC 13,8 kV 9,6 Mvar COXIPO BC2 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC2 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,096.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | BC 13,8 kV 9,6 Mvar COXIPO BC2 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC2 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$136,977.85 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | BC 13,8 kV 9,6 Mvar COXIPO BC2 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC2 MT | 058/2001 | IPCA | RMEL | REN 905/2020 | 12/17/2020 | 12/20/2050 | R$22,800.02 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | COXIPO | BC 13,8 kV 9,6 Mvar COXIPO BC1 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,096.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | BC 13,8 kV 9,6 Mvar COXIPO BC1 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$136,977.85 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | COXIPO | BC 13,8 kV 9,6 Mvar COXIPO BC1 MT | RBF | FT BC 13,8 kV 9,6 MVAr COXIPO BC1 MT | 058/2001 | IPCA | RMEL | REN 905/2020 | 12/16/2020 | 12/19/2050 | R$17,406.71 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| NOVA ERA TERESINA | CRATEUS | RTL 500 kV 55 Mvar CRATEUS RTR2 CE | RB | FT RTL 500 kV 55 Mvar CRATEUS RTR2 CE | 004/2024 | IPCA | RBL | CC 004/2024 | R$511,732.25 | 6/1/2025 | Prevista | T2024-193-A | LT 500kV Quixadá – Crateús C1. | ||||
| NOVA ERA TERESINA | CRATEUS | RTL 500 kV 165 Mvar CRATEUS RT4 CE | RB | FT LT 500 kV CRATEUS /TERESINA IV C-1 CE/PI | 004/2024 | IPCA | RBL | CC 004/2024 | R$ 1,535,566.15 | 6/1/2025 | Prevista | T2024-193-A | LT 500kV Crateús – Teresina IV C1 | ||||
| NOVA ERA TERESINA | CRATEUS | RTL 500 kV 165 Mvar CRATEUS RT3 CE | RB | FT LT 500 kV QUIXADA /CRATEUS C-1 CE | 004/2024 | IPCA | RBL | CC 004/2024 | R$ 1,535,196.76 | 6/1/2025 | Prevista | T2024-193-A | LT 500kV Quixadá – Crateús C1. | ||||
| NOVA ERA TERESINA | CRATEUS | RTB 500 kV 50 Mvar CRATEUS RTR1 CE | RB | FT RTB 500 kV 50 Mvar CRATEUS RTR1 CE | 004/2024 | IPCA | RBL | CC 004/2024 | R$505,646.17 | 6/1/2025 | Prevista | T2024-193-A | -SE Cratéus -SE Teresina IV-SE Teresina II - Secc. LT 500kV Tianguá II - Teresina II C1-Remanejamento de reatores da LT 500kV Tianguá II – Teresina II C1 (05V9), conectados sem disjuntor na SE Teresina II, para conexão sem disjuntor na LT 500kV Tianguá II – Teresina IV C1, no terminal SE Teresina IV-Remanejamento de reator reserva da LT 500kV Tianguá II – Teresina II C1 (05V9), que passará a reserva do reator de linha da LT 500kV Tianguá II – Teresina IV C1, no terminal SE Teresina IV-SE Teresina II - Secc. LT 500kV Tianguá II - Teresina II C2-Remanejamento de reatores da LT 500kV Tianguá II – Teresina II C2 (05C7), conectados sem disjuntor no terminal SE Teresina II, para conexão sem disjuntor na LT 500kV Tianguá II – Teresina IV C2, no terminal SE Teresina IV -Remanejamento de reator reserva da LT 500kV Tianguá II – Teresina II C2 (05C7), que passará a ser disponibilizado como reserva na LT 500kV Tianguá II – Teresina IV C2, no terminal SE Teresina IV -Remanejamento d | ||||
| NOVA ERA TERESINA | CRATEUS | RTB 500 kV 150 Mvar CRATEUS RT2 CE | RB | FT RTB 500 kV 150 Mvar CRATEUS RT2 CE | 004/2024 | IPCA | RBL | CC 004/2024 | R$ 1,516,938.51 | 6/1/2025 | Prevista | T2024-193-A | -SE Cratéus -SE Teresina IV-SE Teresina II - Secc. LT 500kV Tianguá II - Teresina II C1-Remanejamento de reatores da LT 500kV Tianguá II – Teresina II C1 (05V9), conectados sem disjuntor na SE Teresina II, para conexão sem disjuntor na LT 500kV Tianguá II – Teresina IV C1, no terminal SE Teresina IV-Remanejamento de reator reserva da LT 500kV Tianguá II – Teresina II C1 (05V9), que passará a reserva do reator de linha da LT 500kV Tianguá II – Teresina IV C1, no terminal SE Teresina IV-SE Teresina II - Secc. LT 500kV Tianguá II - Teresina II C2-Remanejamento de reatores da LT 500kV Tianguá II – Teresina II C2 (05C7), conectados sem disjuntor no terminal SE Teresina II, para conexão sem disjuntor na LT 500kV Tianguá II – Teresina IV C2, no terminal SE Teresina IV -Remanejamento de reator reserva da LT 500kV Tianguá II – Teresina II C2 (05C7), que passará a ser disponibilizado como reserva na LT 500kV Tianguá II – Teresina IV C2, no terminal SE Teresina IV -Remanejamento d | ||||
| NOVA ERA TERESINA | CRATEUS | RTB 500 kV 150 Mvar CRATEUS RT1 CE | RB | FT RTB 500 kV 150 Mvar CRATEUS RT1 CE | 004/2024 | IPCA | RBL | CC 004/2024 | R$ 1,516,938.51 | 6/1/2025 | Prevista | T2024-193-A | -SE Cratéus -SE Teresina IV-SE Teresina II - Secc. LT 500kV Tianguá II - Teresina II C1-Remanejamento de reatores da LT 500kV Tianguá II – Teresina II C1 (05V9), conectados sem disjuntor na SE Teresina II, para conexão sem disjuntor na LT 500kV Tianguá II – Teresina IV C1, no terminal SE Teresina IV-Remanejamento de reator reserva da LT 500kV Tianguá II – Teresina II C1 (05V9), que passará a reserva do reator de linha da LT 500kV Tianguá II – Teresina IV C1, no terminal SE Teresina IV-SE Teresina II - Secc. LT 500kV Tianguá II - Teresina II C2-Remanejamento de reatores da LT 500kV Tianguá II – Teresina II C2 (05C7), conectados sem disjuntor no terminal SE Teresina II, para conexão sem disjuntor na LT 500kV Tianguá II – Teresina IV C2, no terminal SE Teresina IV -Remanejamento de reator reserva da LT 500kV Tianguá II – Teresina II C2 (05C7), que passará a ser disponibilizado como reserva na LT 500kV Tianguá II – Teresina IV C2, no terminal SE Teresina IV -Remanejamento d | ||||
| NOVA ERA TERESINA | CRATEUS | MG 500 kV CRATEUS MG1 CE | RB | FT MG 500 kV CRATEUS MG1 CE | 004/2024 | IPCA | RBL | CC 004/2024 | R$ 2,122,918.28 | 6/1/2025 | Prevista | T2024-193-A | -SE Cratéus -SE Teresina IV-SE Teresina II - Secc. LT 500kV Tianguá II - Teresina II C1-Remanejamento de reatores da LT 500kV Tianguá II – Teresina II C1 (05V9), conectados sem disjuntor na SE Teresina II, para conexão sem disjuntor na LT 500kV Tianguá II – Teresina IV C1, no terminal SE Teresina IV-Remanejamento de reator reserva da LT 500kV Tianguá II – Teresina II C1 (05V9), que passará a reserva do reator de linha da LT 500kV Tianguá II – Teresina IV C1, no terminal SE Teresina IV-SE Teresina II - Secc. LT 500kV Tianguá II - Teresina II C2-Remanejamento de reatores da LT 500kV Tianguá II – Teresina II C2 (05C7), conectados sem disjuntor no terminal SE Teresina II, para conexão sem disjuntor na LT 500kV Tianguá II – Teresina IV C2, no terminal SE Teresina IV -Remanejamento de reator reserva da LT 500kV Tianguá II – Teresina II C2 (05C7), que passará a ser disponibilizado como reserva na LT 500kV Tianguá II – Teresina IV C2, no terminal SE Teresina IV -Remanejamento d | ||||
| NOVA ERA TERESINA | CRATEUS | MC 500 kV RTL 500 kV 165 Mvar CRATEUS RT4 CE | RB | FT LT 500 kV CRATEUS /TERESINA IV C-1 CE/PI | 004/2024 | IPCA | RBL | CC 004/2024 | R$295,173.42 | 6/1/2025 | Prevista | T2024-193-A | LT 500kV Crateús – Teresina IV C1 | ||||
| NOVA ERA TERESINA | CRATEUS | MC 500 kV RTL 500 kV 165 Mvar CRATEUS RT3 CE | RB | FT LT 500 kV QUIXADA /CRATEUS C-1 CE | 004/2024 | IPCA | RBL | CC 004/2024 | R$295,102.41 | 6/1/2025 | Prevista | T2024-193-A | LT 500kV Quixadá – Crateús C1. | ||||
| NOVA ERA TERESINA | CRATEUS | MC 500 kV RTB 500 kV 150 Mvar CRATEUS RT2 CE | RB | FT RTB 500 kV 150 Mvar CRATEUS RT2 CE | 004/2024 | IPCA | RBL | CC 004/2024 | R$ 1,034,360.73 | 6/1/2025 | Prevista | T2024-193-A | -SE Cratéus -SE Teresina IV-SE Teresina II - Secc. LT 500kV Tianguá II - Teresina II C1-Remanejamento de reatores da LT 500kV Tianguá II – Teresina II C1 (05V9), conectados sem disjuntor na SE Teresina II, para conexão sem disjuntor na LT 500kV Tianguá II – Teresina IV C1, no terminal SE Teresina IV-Remanejamento de reator reserva da LT 500kV Tianguá II – Teresina II C1 (05V9), que passará a reserva do reator de linha da LT 500kV Tianguá II – Teresina IV C1, no terminal SE Teresina IV-SE Teresina II - Secc. LT 500kV Tianguá II - Teresina II C2-Remanejamento de reatores da LT 500kV Tianguá II – Teresina II C2 (05C7), conectados sem disjuntor no terminal SE Teresina II, para conexão sem disjuntor na LT 500kV Tianguá II – Teresina IV C2, no terminal SE Teresina IV -Remanejamento de reator reserva da LT 500kV Tianguá II – Teresina II C2 (05C7), que passará a ser disponibilizado como reserva na LT 500kV Tianguá II – Teresina IV C2, no terminal SE Teresina IV -Remanejamento d | ||||
| NOVA ERA TERESINA | CRATEUS | MC 500 kV RTB 500 kV 150 Mvar CRATEUS RT1 CE | RB | FT RTB 500 kV 150 Mvar CRATEUS RT1 CE | 004/2024 | IPCA | RBL | CC 004/2024 | R$ 1,034,360.73 | 6/1/2025 | Prevista | T2024-193-A | -SE Cratéus -SE Teresina IV-SE Teresina II - Secc. LT 500kV Tianguá II - Teresina II C1-Remanejamento de reatores da LT 500kV Tianguá II – Teresina II C1 (05V9), conectados sem disjuntor na SE Teresina II, para conexão sem disjuntor na LT 500kV Tianguá II – Teresina IV C1, no terminal SE Teresina IV-Remanejamento de reator reserva da LT 500kV Tianguá II – Teresina II C1 (05V9), que passará a reserva do reator de linha da LT 500kV Tianguá II – Teresina IV C1, no terminal SE Teresina IV-SE Teresina II - Secc. LT 500kV Tianguá II - Teresina II C2-Remanejamento de reatores da LT 500kV Tianguá II – Teresina II C2 (05C7), conectados sem disjuntor no terminal SE Teresina II, para conexão sem disjuntor na LT 500kV Tianguá II – Teresina IV C2, no terminal SE Teresina IV -Remanejamento de reator reserva da LT 500kV Tianguá II – Teresina II C2 (05C7), que passará a ser disponibilizado como reserva na LT 500kV Tianguá II – Teresina IV C2, no terminal SE Teresina IV -Remanejamento d | ||||
| NOVA ERA TERESINA | CRATEUS | MC 500 kV CS 300/-200 Mvar CRATEUS CS1 CE | RB | FT CS 300/-200 Mvar CRATEUS CS1 CE | 004/2024 | IPCA | RBL | CC 004/2024 | R$ 1,343,240.40 | 6/1/2025 | Prevista | T2024-193-A | 1 Compensador Síncrono (-200/+300) Mvar na SE Crateús | ||||
| NOVA ERA TERESINA | CRATEUS | IB 500 kV MG 500 kV CRATEUS MG1 CE IB3 | RB | FT MG 500 kV CRATEUS MG1 CE | 004/2024 | IPCA | RBL | CC 004/2024 | R$ 1,205,495.92 | 6/1/2025 | Prevista | T2024-193-A | -SE Cratéus -SE Teresina IV-SE Teresina II - Secc. LT 500kV Tianguá II - Teresina II C1-Remanejamento de reatores da LT 500kV Tianguá II – Teresina II C1 (05V9), conectados sem disjuntor na SE Teresina II, para conexão sem disjuntor na LT 500kV Tianguá II – Teresina IV C1, no terminal SE Teresina IV-Remanejamento de reator reserva da LT 500kV Tianguá II – Teresina II C1 (05V9), que passará a reserva do reator de linha da LT 500kV Tianguá II – Teresina IV C1, no terminal SE Teresina IV-SE Teresina II - Secc. LT 500kV Tianguá II - Teresina II C2-Remanejamento de reatores da LT 500kV Tianguá II – Teresina II C2 (05C7), conectados sem disjuntor no terminal SE Teresina II, para conexão sem disjuntor na LT 500kV Tianguá II – Teresina IV C2, no terminal SE Teresina IV -Remanejamento de reator reserva da LT 500kV Tianguá II – Teresina II C2 (05C7), que passará a ser disponibilizado como reserva na LT 500kV Tianguá II – Teresina IV C2, no terminal SE Teresina IV -Remanejamento d | ||||
| NOVA ERA TERESINA | CRATEUS | IB 500 kV MG 500 kV CRATEUS MG1 CE IB2 | RB | FT MG 500 kV CRATEUS MG1 CE | 004/2024 | IPCA | RBL | CC 004/2024 | R$ 1,205,495.92 | 6/1/2025 | Prevista | T2024-193-A | -SE Cratéus -SE Teresina IV-SE Teresina II - Secc. LT 500kV Tianguá II - Teresina II C1-Remanejamento de reatores da LT 500kV Tianguá II – Teresina II C1 (05V9), conectados sem disjuntor na SE Teresina II, para conexão sem disjuntor na LT 500kV Tianguá II – Teresina IV C1, no terminal SE Teresina IV-Remanejamento de reator reserva da LT 500kV Tianguá II – Teresina II C1 (05V9), que passará a reserva do reator de linha da LT 500kV Tianguá II – Teresina IV C1, no terminal SE Teresina IV-SE Teresina II - Secc. LT 500kV Tianguá II - Teresina II C2-Remanejamento de reatores da LT 500kV Tianguá II – Teresina II C2 (05C7), conectados sem disjuntor no terminal SE Teresina II, para conexão sem disjuntor na LT 500kV Tianguá II – Teresina IV C2, no terminal SE Teresina IV -Remanejamento de reator reserva da LT 500kV Tianguá II – Teresina II C2 (05C7), que passará a ser disponibilizado como reserva na LT 500kV Tianguá II – Teresina IV C2, no terminal SE Teresina IV -Remanejamento d | ||||
| NOVA ERA TERESINA | CRATEUS | IB 500 kV MG 500 kV CRATEUS MG1 CE IB1 | RB | FT MG 500 kV CRATEUS MG1 CE | 004/2024 | IPCA | RBL | CC 004/2024 | R$ 1,205,495.92 | 6/1/2025 | Prevista | T2024-193-A | -SE Cratéus -SE Teresina IV-SE Teresina II - Secc. LT 500kV Tianguá II - Teresina II C1-Remanejamento de reatores da LT 500kV Tianguá II – Teresina II C1 (05V9), conectados sem disjuntor na SE Teresina II, para conexão sem disjuntor na LT 500kV Tianguá II – Teresina IV C1, no terminal SE Teresina IV-Remanejamento de reator reserva da LT 500kV Tianguá II – Teresina II C1 (05V9), que passará a reserva do reator de linha da LT 500kV Tianguá II – Teresina IV C1, no terminal SE Teresina IV-SE Teresina II - Secc. LT 500kV Tianguá II - Teresina II C2-Remanejamento de reatores da LT 500kV Tianguá II – Teresina II C2 (05C7), conectados sem disjuntor no terminal SE Teresina II, para conexão sem disjuntor na LT 500kV Tianguá II – Teresina IV C2, no terminal SE Teresina IV -Remanejamento de reator reserva da LT 500kV Tianguá II – Teresina II C2 (05C7), que passará a ser disponibilizado como reserva na LT 500kV Tianguá II – Teresina IV C2, no terminal SE Teresina IV -Remanejamento d | ||||
| NOVA ERA TERESINA | CRATEUS | EL 500 kV CRATEUS LT 500 kV QUIXADA /CRATEUS C-1 CE | RB | FT LT 500 kV QUIXADA /CRATEUS C-1 CE | 004/2024 | IPCA | RBL | CC 004/2024 | R$ 1,131,408.36 | 6/1/2025 | Prevista | T2024-193-A | LT 500kV Quixadá – Crateús C1. | ||||
| NOVA ERA TERESINA | CRATEUS | EL 500 kV CRATEUS LT 500 kV CRATEUS /TERESINA IV C-1 CE/PI | RB | FT LT 500 kV CRATEUS /TERESINA IV C-1 CE/PI | 004/2024 | IPCA | RBL | CC 004/2024 | R$ 1,131,680.60 | 6/1/2025 | Prevista | T2024-193-A | LT 500kV Crateús – Teresina IV C1 | ||||
| NOVA ERA TERESINA | CRATEUS | CS 300/-200 Mvar CRATEUS CS1 CE | RB | FT CS 300/-200 Mvar CRATEUS CS1 CE | 004/2024 | IPCA | RBL | CC 004/2024 | R$ 21,115,507.96 | 6/1/2025 | Prevista | T2024-193-A | 1 Compensador Síncrono (-200/+300) Mvar na SE Crateús | ||||
| Nova Era Integração | CRATO II | MC 230 kV BC 230 kV 30 Mvar CRATO II BC2 CE | RB | FT BC 230 kV 30 Mvar CRATO II BC2 CE | 008/2024 | IPCA | RBL | CC 008/2024 | R$545,881.90 | 6/1/2025 | Prevista | T2024-197-E | SE 230 kV Crato II – 1º e 2º Banco de Capacitores em Derivação. | ||||
| Nova Era Integração | CRATO II | MC 230 kV BC 230 kV 30 Mvar CRATO II BC1 CE | RB | FT BC 230 kV 30 Mvar CRATO II BC1 CE | 008/2024 | IPCA | RBL | CC 008/2024 | R$545,881.90 | 6/1/2025 | Prevista | T2024-197-E | SE 230 kV Crato II – 1º e 2º Banco de Capacitores em Derivação. | ||||
| Nova Era Integração | CRATO II | EL 230 kV CRATO II LT 230 kV CHAPADA III /CRATO II C-1 PI/CE | RB | FT LT 230 kV CHAPADA III /CRATO II C-1 PI/CE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,346,273.76 | 6/1/2025 | Prevista | T2024-197-D | LT 230 kV Chapada III - Crato II - C1 | ||||
| Nova Era Integração | CRATO II | BC 230 kV 30 Mvar CRATO II BC2 CE | RB | FT BC 230 kV 30 Mvar CRATO II BC2 CE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,069,465.91 | 6/1/2025 | Prevista | T2024-197-E | SE 230 kV Crato II – 1º e 2º Banco de Capacitores em Derivação. | ||||
| Nova Era Integração | CRATO II | BC 230 kV 30 Mvar CRATO II BC1 CE | RB | FT BC 230 kV 30 Mvar CRATO II BC1 CE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,069,465.91 | 6/1/2025 | Prevista | T2024-197-E | SE 230 kV Crato II – 1º e 2º Banco de Capacitores em Derivação. | ||||
| AXIA Energia Sul | CURITIBA | TR 500/230 kV CURITIBA TRR1 PR | RB | FT TR 500/230 kV CURITIBA TRR1 PR | 057/2001 | IPCA | RMEL | REA 10921/2021 | 12/27/2024 | 12/26/2059 | R$ 3,352,363.89 | 6/1/2025 | Ativa | T2021-111 | Obra de Substituição Completa - Substituir na SE Curitiba o transformador monofásico reserva - TFR1 - 525/230 kV - 224 MVA por outro de 224 MVA. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Sul | CURITIBA | TR 500/230 kV CURITIBA TR2 PR | RB | FT TR 500/230 kV CURITIBA TR2 PR | 057/2001 | IPCA | RMEL | REA 10921/2021 | 11/24/2024 | 11/23/2059 | R$ 10,057,091.67 | 6/1/2025 | Ativa | T2021-112 | Obra de Substituição Completa - Substituir na SE Curitiba o autotransformador monofásico Fase A, B e C - TF2 - 525/230 kV - 672 MVA por outro de 672 MVA. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Sul | CURITIBA | TR 500/230 kV CURITIBA TR1 PR | RB | FT TR 500/230 kV CURITIBA TR1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,674,009.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CURITIBA | TR 500/230 kV CURITIBA TR1 PR | RB | FT TR 500/230 kV CURITIBA TR1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,938,023.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CURITIBA | TR 500/230 kV CURITIBA TR1 PR | RB | FT TR 500/230 kV CURITIBA TR1 PR | 057/2001 | IPCA | RMEL | REN 443/2011 | 10/25/2015 | 10/24/2043 | R$37,058.21 | 6/1/2025 | Ativa | Instalação de armário de plugs para os bancos de transformadores 1 e 2 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CURITIBA | TR 500/230 kV CURITIBA TR1 PR | RB | FT TR 500/230 kV CURITIBA TR1 PR | 057/2001 | IPCA | RMEL | REA 11323/2022 | 3/9/2025 | 3/8/2061 | R$ 5,820,689.22 | 6/1/2025 | Ativa | T2021-098 | Obra de Substituição Parcial - Substituir na SE Curitiba as fases B e C do autotransformador monofásico TF1 525/230 kV - 224 MVA cada, por outras duas de 224 MVA. Não foi considerada receita adicional de O&M pois não se trata de um módulo de equipamento completo. | ||
| AXIA Energia Sul | CURITIBA | RTL 500 kV 150 Mvar CURITIBA RT2 PR | RB | FT RTL 500 kV 150 Mvar CURITIBA RT2 PR | 057/2001 | IPCA | RMEL | REA 10921/2021 | 11/15/2024 | 11/14/2060 | R$ 2,740,125.97 | 6/1/2025 | Ativa | T2021-109 | Obra de Substituição Completa - Substituir na SE Curitiba o reator monofásico - RE2 - 525 kV - 150 MVA por outro de 150 MVA. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Sul | CURITIBA | RTB 500 kV 50 Mvar CURITIBA RTR2 PR | RB | FT RTB 500 kV 50 Mvar CURITIBA RTR2 PR | 057/2001 | IPCA | RMEL | REA 10921/2021 | 11/22/2024 | 11/21/2060 | R$913,375.33 | 6/1/2025 | Ativa | T2021-110 | Obra de Substituição Completa - Substituir na SE Curitiba o reator monofásico - RER2 - 525 kV - 50 MVAr por outro de 50 MVA. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Sul | CURITIBA | RTB 500 kV 150 Mvar CURITIBA RT1 PR | RB | FT RTB 500 kV 150 Mvar CURITIBA RT1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$669,604.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CURITIBA | RTB 500 kV 150 Mvar CURITIBA RT1 PR | RB | FT RTB 500 kV 150 Mvar CURITIBA RT1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,175,211.47 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CURITIBA | RTB 500 kV 150 Mvar CURITIBA RT1 PR | RB | FT RTB 500 kV 150 Mvar CURITIBA RT1 PR | 057/2001 | IPCA | RMELP | REA 13930/2023 | R$963,546.76 | 6/1/2025 | Prevista | T2023-031 | Obra de Substituição Parcial - Substituição de banco de reatores monofásicos, RE1, 525 kV, 50 Mvar - FASE A. SGPMR 1445/2022 | ||||
| AXIA Energia Sul | CURITIBA | MG 500 kV CURITIBA MG1 PR | RB | FT MG 500 kV CURITIBA MG1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,436,005.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CURITIBA | MG 500 kV CURITIBA MG1 PR | RB | FT MG 500 kV CURITIBA MG1 PR | 057/2001 | IPCA | RMEL | REN 643/2014 | 12/1/2013 | 12/24/2028 | R$544,481.02 | 6/1/2025 | Ativa | Implantação de sistema digital de controle e supervisão Nível III.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CURITIBA | MG 500 kV CURITIBA MG1 PR | RB | FT MG 500 kV CURITIBA MG1 PR | 057/2001 | IPCA | RMEL | REN 443/2011 | 11/14/2015 | 11/13/2032 | R$9,897.39 | 6/1/2025 | Ativa | Aquisição e substituição de um banco de baterias de 125 Vcc - Bat1 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019.* Receita alterada no recurso contra a REH 2.407/2018. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CURITIBA | MG 500 kV CURITIBA MG1 PR | RB | FT MG 500 kV CURITIBA MG1 PR | 057/2001 | IPCA | RMEL | REN 443/2011 | 11/14/2015 | 11/13/2032 | R$9,897.39 | 6/1/2025 | Ativa | Aquisição e substituição de um banco de baterias de 125 Vcc - Bat2 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019. Receita alterada no recurso contra a REH 2.407/2018. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CURITIBA | MG 500 kV CURITIBA MG1 PR | RB | FT MG 500 kV CURITIBA MG1 PR | 057/2001 | IPCA | RBNI | REA 5861/2016 | 8/24/2018 | 8/23/2046 | R$50,374.28 | 6/1/2025 | Ativa | Substituição de 1 Registrador de Perturbação (RDP) e Instalação de 1 novo RDP * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CURITIBA | MG 500 kV CURITIBA MG1 PR | RB | FT MG 500 kV CURITIBA MG1 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 3/10/2020 | 7/2/2044 | R$392,410.35 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CURITIBA | MC 500 kV TR 500/230 kV CURITIBA TR2 PR | RB | FT TR 500/230 kV CURITIBA TR2 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$358,630.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CURITIBA | MC 500 kV TR 500/230 kV CURITIBA TR2 PR | RB | FT TR 500/230 kV CURITIBA TR2 PR | 057/2001 | IPCA | RMEL | REN 643/2014 | 9/1/2013 | 8/31/2037 | R$35,870.45 | 6/1/2025 | Ativa | Substituição dos para-raios de 420 kV do TF2.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CURITIBA | MC 500 kV TR 500/230 kV CURITIBA TR1 PR | RB | FT TR 500/230 kV CURITIBA TR1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$358,630.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CURITIBA | MC 500 kV TR 500/230 kV CURITIBA TR1 PR | RB | FT TR 500/230 kV CURITIBA TR1 PR | 057/2001 | IPCA | RMEL | REN 643/2014 | 8/22/2013 | 8/21/2037 | R$35,825.24 | 6/1/2025 | Ativa | Substituição dos para-raios de 420 kV do TF1.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CURITIBA | MC 500 kV RTL 500 kV 150 Mvar CURITIBA RT2 PR | RB | FT RTL 500 kV 150 Mvar CURITIBA RT2 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$217,273.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CURITIBA | MC 500 kV RTL 500 kV 150 Mvar CURITIBA RT2 PR | RB | FT RTL 500 kV 150 Mvar CURITIBA RT2 PR | 057/2001 | IPCA | RMEL | REN 643/2014 | 12/17/2013 | 12/16/2037 | R$7,866.41 | 6/1/2025 | Ativa | Substituição dos para-raios de 420 kV do RE2.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CURITIBA | MC 500 kV RTL 500 kV 150 Mvar CURITIBA RT2 PR | RB | FT RTL 500 kV 150 Mvar CURITIBA RT2 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 3/31/2022 | 9/6/2052 | R$66,848.05 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CURITIBA | MC 500 kV RTB 500 kV 150 Mvar CURITIBA RT1 PR | RB | FT RTB 500 kV 150 Mvar CURITIBA RT1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$335,783.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CURITIBA | MC 500 kV RTB 500 kV 150 Mvar CURITIBA RT1 PR | RB | FT RTB 500 kV 150 Mvar CURITIBA RT1 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/31/2023 | 1/30/2056 | R$2,496.83 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CURITIBA | MC 230 kV TR 500/230 kV CURITIBA TR2 PR | RB | FT TR 500/230 kV CURITIBA TR2 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$154,951.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CURITIBA | MC 230 kV TR 500/230 kV CURITIBA TR2 PR | RB | FT TR 500/230 kV CURITIBA TR2 PR | 057/2001 | IPCA | RMEL | REN 643/2014 | 11/10/2013 | 11/9/2037 | R$17,404.82 | 6/1/2025 | Ativa | Substituição dos para-raios 230 kV de SiC por ZnO do TF1 e do TF2.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CURITIBA | MC 230 kV TR 500/230 kV CURITIBA TR2 PR | RB | FT TR 500/230 kV CURITIBA TR2 PR | 057/2001 | IPCA | RBNI | REA 8314/2019 | 11/27/2020 | 11/26/2053 | R$182,122.29 | 6/1/2025 | Ativa | Substituição de Disjuntor no vão TF-2 525/230(802 e 804) - SE CBA * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CURITIBA | MC 230 kV TR 500/230 kV CURITIBA TR2 PR | RB | FT TR 500/230 kV CURITIBA TR2 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 2/22/2021 | 2/25/2051 | R$21,633.23 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CURITIBA | MC 230 kV TR 500/230 kV CURITIBA TR1 PR | RB | FT TR 500/230 kV CURITIBA TR1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$154,951.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CURITIBA | MC 230 kV TR 500/230 kV CURITIBA TR1 PR | RB | FT TR 500/230 kV CURITIBA TR1 PR | 057/2001 | IPCA | RMEL | REN 643/2014 | 10/12/2013 | 10/11/2037 | R$17,341.77 | 6/1/2025 | Ativa | Substituição dos para-raios 230 kV de SiC por ZnO do TF1.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CURITIBA | MC 230 kV TR 500/230 kV CURITIBA TR1 PR | RB | FT TR 500/230 kV CURITIBA TR1 PR | 057/2001 | IPCA | RBNI | REA 8314/2019 | 11/11/2020 | 11/10/2053 | R$181,912.90 | 6/1/2025 | Ativa | Substituição de Disjuntor no vão TF-1 525/230(792 e 794) - SE CBA * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CURITIBA | MC 230 kV TR 500/230 kV CURITIBA TR1 PR | RB | FT TR 500/230 kV CURITIBA TR1 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 9/1/2018 | 9/3/2048 | R$20,116.28 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CURITIBA | IB 500 kV MG 500 kV CURITIBA MG1 PR IB3 | RB | FT MG 500 kV CURITIBA MG1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CURITIBA | IB 500 kV MG 500 kV CURITIBA MG1 PR IB2 | RB | FT MG 500 kV CURITIBA MG1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CURITIBA | IB 500 kV MG 500 kV CURITIBA MG1 PR IB2 | RB | FT MG 500 kV CURITIBA MG1 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 10/14/2022 | 10/16/2052 | R$39,411.74 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CURITIBA | IB 500 kV MG 500 kV CURITIBA MG1 PR IB2 | RB | FT MG 500 kV CURITIBA MG1 PR | 057/2001 | IPCA | RBNI | REA 8314/2019 | 9/1/2018 | 8/31/2051 | R$220,740.32 | 6/1/2025 | Ativa | Substituição de Disjuntor tripolar 525 kV, DJ1050, referente ao Interligador de Barras entre a LT Areia C-1 e o TF 1. Associado à obra, são esperadas substituições/adaptações de fundações e suportes, cabos de controle e potência, barramento, conectores e conexão de aterramento.. Final de vida útil. Riscos de danos às instalações devido à perda de confiabilidade. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CURITIBA | IB 500 kV MG 500 kV CURITIBA MG1 PR IB1 | RB | FT MG 500 kV CURITIBA MG1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CURITIBA | IB 230 kV MG 500 kV CURITIBA MG1 PR IB1 | RB | FT MG 500 kV CURITIBA MG1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$100,223.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CURITIBA | IB 230 kV MG 500 kV CURITIBA MG1 PR IB1 | RB | FT MG 500 kV CURITIBA MG1 PR | 057/2001 | IPCA | RBNI | REA 4347/2013 | 11/30/2015 | 11/29/2048 | R$89,062.73 | 6/1/2025 | Ativa | Substituição de 1 DJ do vão Barra de Transferência (DJ742). INCLUÍDA NO CICLO 2016/2017 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CURITIBA | EL 500 kV CURITIBA LT 500 kV GASPAR 2 /CURITIBA C-1 SC/PR | RB | FT LT 500 kV GASPAR 2 /CURITIBA C-1 SC/PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CURITIBA | EL 500 kV CURITIBA LT 500 kV CURITIBA /BATEIAS C-1 PR | RB | FT LT 500 kV CURITIBA /BATEIAS C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CURITIBA | EL 500 kV CURITIBA LT 500 kV CURITIBA /BATEIAS C-1 PR | RB | FT LT 500 kV CURITIBA /BATEIAS C-1 PR | 057/2001 | IPCA | RBNI | DSP 386/2021 | 12/9/2021 | 5/30/2052 | R$141,338.17 | 6/1/2025 | Ativa | Substituição de 3 Transformador de Corrente(s) no vão LT CBA-BTA C1 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CURITIBA | EL 500 kV CURITIBA LT 500 kV AREIA /CURITIBA C-1 PR | RB | FT LT 500 kV AREIA /CURITIBA C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CURITIBA | EL 500 kV CURITIBA LT 500 kV AREIA /CURITIBA C-1 PR | RB | FT LT 500 kV AREIA /CURITIBA C-1 PR | 057/2001 | IPCA | RBNI | REA 5484/2015 | 10/28/2015 | 10/27/2043 | R$50,687.35 | 6/1/2025 | Ativa | Substituição das proteções * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CURITIBA | EL 230 kV CURITIBA LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR | RB | FT LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CURITIBA | EL 230 kV CURITIBA LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR | RB | FT LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR | 057/2001 | IPCA | RBNI | REA 4347/2013 | 11/30/2015 | 11/29/2048 | R$89,062.73 | 6/1/2025 | Ativa | Substituição de 1 DJ do vão São Mateus do Sul (DJ712). INCLUÍDA NO CICLO 2016/2017 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CURITIBA | EL 230 kV CURITIBA LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR | RB | FT LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$323,005.58 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CURITIBA | EL 230 kV CURITIBA LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR | RB | FT LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 11/1/2018 | 10/31/2042 | R$26,500.96 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | CURITIBA | EL 230 kV CURITIBA LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC | RB | FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CURITIBA | EL 230 kV CURITIBA LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC | RB | FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC | 057/2001 | IPCA | RBNI | REA 4347/2013 | 11/30/2015 | 11/29/2048 | R$89,062.73 | 6/1/2025 | Ativa | Substituição de 1 DJ do vão Joinville (DJ722). INCLUÍDA NO CICLO 2016/2017 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CURITIBA | EL 230 kV CURITIBA LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC | RB | FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC | 057/2001 | IPCA | RBNI | REA 7761/2019 | 4/30/2019 | 4/29/2043 | R$8,995.66 | 6/1/2025 | Ativa | Substituição de 3 Pára-raios em Joinville (JOI) ; *Reforço autorizado sem RAP Prévia incluído no reajuste do ciclo 2019-2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CURITIBA | EL 230 kV CURITIBA LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC | RB | FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | CURITIBA | EL 230 kV CURITIBA LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC | RB | FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC | 057/2001 | IPCA | RBNI | REA 4347/2013 | 11/30/2015 | 11/29/2048 | R$89,062.73 | 6/1/2025 | Ativa | Substituição de 1 DJ do vão Joinville Norte C1 (DJ762). INCLUÍDA NO CICLO 2016/2017 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | CURITIBA | EL 230 kV CURITIBA LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC | RB | FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC | 057/2001 | IPCA | RBNI | REA 7761/2019 | 4/30/2019 | 4/29/2043 | R$8,995.66 | 6/1/2025 | Ativa | Substituição de 3 Para-raios em Joinville Norte (JNO); * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | CVRD | EL 230 kV CVRD LT 230 kV CVRD /SAO LUIS II C-1 PA/MA | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$253,523.26 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | CVRD | EL 230 kV CVRD LT 230 kV CVRD /SAO LUIS II C-1 PA/MA | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$550,379.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | CVRD | EL 230 kV CVRD LT 230 kV CVRD /SAO LUIS II C-1 PA/MA | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$527,867.49 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | CVRD | EL 230 kV CVRD LT 230 kV CVRD /SAO LUIS II C-1 PA/MA | DIT | 058/2001 | IPCA | RMEL | REN 905/2020 | 9/30/2012 | 9/29/2040 | R$558,483.38 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | TT 69/13,8 kV DELM. GOUVEIA TA2 CE | DIT | 061/2001 | IPCA | RCDM | REA 3578/2012 | 12/4/2016 | 8/2/2047 | R$187,041.77 | 6/1/2025 | Ativa | Obra de Substituição Completa - Substituição de 1 transformador de aterramento: 02A2. (Potência: 7,5 MVA) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | TT 69/13,8 kV DELM. GOUVEIA TA1 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | TT 69/13,8 kV DELM. GOUVEIA TA1 CE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$248,222.69 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | TR 69/13,8 kV DELM. GOUVEIA TR5 CE | RB | FT MG 230 kV DELM. GOUVEIA MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | TR 69/13,8 kV DELM. GOUVEIA TR5 CE | RB | FT MG 230 kV DELM. GOUVEIA MG1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$76,466.27 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | TR 69/13,8 kV DELM. GOUVEIA TR5 CE | RB | FT MG 230 kV DELM. GOUVEIA MG1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$70,492.55 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | TR 230/69 kV DELM. GOUVEIA TR4 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR4 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | TR 230/69 kV DELM. GOUVEIA TR4 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR4 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | TR 230/69 kV DELM. GOUVEIA TR4 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR4 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$913,997.96 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | TR 230/69 kV DELM. GOUVEIA TR4 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR4 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/24/2021 | 5/1/2056 | R$66,465.84 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | TR 230/69 kV DELM. GOUVEIA TR3 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | TR 230/69 kV DELM. GOUVEIA TR3 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR3 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | TR 230/69 kV DELM. GOUVEIA TR3 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR3 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$913,997.96 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | TR 230/69 kV DELM. GOUVEIA TR3 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR3 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2021 | 12/10/2055 | R$55,802.39 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | TR 230/69 kV DELM. GOUVEIA TR2 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | TR 230/69 kV DELM. GOUVEIA TR2 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | TR 230/69 kV DELM. GOUVEIA TR2 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$913,997.96 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | TR 230/69 kV DELM. GOUVEIA TR2 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR2 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/24/2021 | 5/1/2056 | R$56,689.77 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | TR 230/69 kV DELM. GOUVEIA TR1 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | TR 230/69 kV DELM. GOUVEIA TR1 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | TR 230/69 kV DELM. GOUVEIA TR1 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$913,997.96 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | TR 230/69 kV DELM. GOUVEIA TR1 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/12/2020 | 10/21/2055 | R$39,646.15 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MG 230 kV DELM. GOUVEIA MG1 CE | RB | FT MG 230 kV DELM. GOUVEIA MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$585,142.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MG 230 kV DELM. GOUVEIA MG1 CE | RB | FT MG 230 kV DELM. GOUVEIA MG1 CE | 061/2001 | IPCA | RBNI | REA 2040/2009 | 1/26/2014 | 1/25/2047 | R$20,060.74 | 6/1/2025 | Ativa | Substituição da Chave seccionadora 32BP-1. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MG 230 kV DELM. GOUVEIA MG1 CE | RB | FT MG 230 kV DELM. GOUVEIA MG1 CE | 061/2001 | IPCA | RBNI | REA 2040/2009 | 1/26/2014 | 1/29/2044 | R$15,592.10 | 6/1/2025 | Ativa | Substituição da Chave seccionadora 32T5-4. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MG 230 kV DELM. GOUVEIA MG1 CE | RB | FT MG 230 kV DELM. GOUVEIA MG1 CE | 061/2001 | IPCA | RBNI | REA 2040/2009 | 10/10/2012 | 10/9/2045 | R$19,230.69 | 6/1/2025 | Ativa | Substituição da Chave seccionadora 32BP-2. Incluído no reajuste ciclo 2014-2015. RAP ativada no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MG 230 kV DELM. GOUVEIA MG1 CE | RB | FT MG 230 kV DELM. GOUVEIA MG1 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/15/2013 | 12/14/2030 | R$15,747.56 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCO DE BATERIAS 800A1 E 800A2 DE 125 Vcc. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MG 230 kV DELM. GOUVEIA MG1 CE | RB | FT MG 230 kV DELM. GOUVEIA MG1 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 1/28/2014 | 1/27/2031 | R$1,652.96 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCOS DE BATERIAS -48Vcc Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MG 230 kV DELM. GOUVEIA MG1 CE | RB | FT MG 230 kV DELM. GOUVEIA MG1 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 2/28/2015 | 2/27/2043 | R$42,230.49 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DO CONCENTRADOR DE DADOS PARA ATENDIMENTO AO AUMENTO DA OBSERVABILIDADE ASSOCIADA AO PROCEDIMENTO DE REDE 2.7..Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MG 230 kV DELM. GOUVEIA MG1 CE | RB | FT MG 230 kV DELM. GOUVEIA MG1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,642,009.69 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MG 230 kV DELM. GOUVEIA MG1 CE | RB | FT MG 230 kV DELM. GOUVEIA MG1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,513,732.31 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MG 230 kV DELM. GOUVEIA MG1 CE | RB | FT MG 230 kV DELM. GOUVEIA MG1 CE | 061/2001 | IPCA | RMEL | REN 443/2011 | 12/29/2016 | 12/28/2044 | R$65,890.66 | 6/1/2025 | Ativa | Implantação de Sistemas Automáticos de Regulação associados a transformadores. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MG 230 kV DELM. GOUVEIA MG1 CE | RB | FT MG 230 kV DELM. GOUVEIA MG1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/13/2021 | 5/9/2041 | R$236,058.86 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV TT 69/13,8 kV DELM. GOUVEIA TA2 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV TT 69/13,8 kV DELM. GOUVEIA TA2 CE | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 5/30/2013 | 5/29/2046 | R$19,637.01 | 6/1/2025 | Ativa | Substituição da Chave seccionadora 32A2-8. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV TT 69/13,8 kV DELM. GOUVEIA TA1 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV TT 69/13,8 kV DELM. GOUVEIA TA1 CE | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 1/26/2014 | 1/25/2047 | R$20,060.74 | 6/1/2025 | Ativa | Substituição da Chave seccionadora 32A1-8. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV TR 69/13,8 kV DELM. GOUVEIA TR5 CE | RB | FT MG 230 kV DELM. GOUVEIA MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV TR 230/69 kV DELM. GOUVEIA TR4 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR4 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV TR 230/69 kV DELM. GOUVEIA TR4 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR4 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV TR 230/69 kV DELM. GOUVEIA TR4 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR4 CE | 061/2001 | IPCA | RBNI | REA 2040/2009 | 3/3/2013 | 3/2/2046 | R$60,523.80 | 6/1/2025 | Ativa | MC 69 kV TR 230/69 kV DELM. GOUVEIA TR4 CE * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV TR 230/69 kV DELM. GOUVEIA TR3 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV TR 230/69 kV DELM. GOUVEIA TR3 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR3 CE | 061/2001 | IPCA | RBNI | REA 2040/2009 | 12/11/2012 | 12/10/2045 | R$58,018.79 | 6/1/2025 | Ativa | Substituição da Chave seccionadora 32T3-4/5/6. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV TR 230/69 kV DELM. GOUVEIA TR2 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV TR 230/69 kV DELM. GOUVEIA TR2 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR2 CE | 061/2001 | IPCA | RBNI | REA 2040/2009 | 3/24/2013 | 3/23/2046 | R$58,557.89 | 6/1/2025 | Ativa | Substituição da Chave seccionadora 32T2-4/5/6. Incluído no reajuste ciclo 2014-2015. RAP ativada no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV TR 230/69 kV DELM. GOUVEIA TR2 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV TR 230/69 kV DELM. GOUVEIA TR1 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV TR 230/69 kV DELM. GOUVEIA TR1 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV TR 230/69 kV DELM. GOUVEIA TR1 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR1 CE | 061/2001 | IPCA | RMEL | REN 443/2011 | 12/20/2015 | 12/19/2039 | R$6,024.12 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE PARARAIOS, POSIÇÃO 72T1 FASES A,B E C DA SUB DELMIRO GOUVEIA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC4 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC4 CE | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 1/30/2013 | 2/2/2043 | R$7,322.74 | 6/1/2025 | Ativa | Substituição da Chave seccionadora 32H4-4.Reforço autorizado pela REA 2040/2009. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC4 CE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC3 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC3 CE | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 4/9/2013 | 8/16/2044 | R$17,888.19 | 6/1/2025 | Ativa | Substituição do TC de Proteção 92H3(B) / Substituição do TC de Proteção 92H3-(N). RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC3 CE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC2 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC2 CE | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 4/9/2013 | 8/16/2044 | R$35,776.39 | 6/1/2025 | Ativa | Substituição do TC de Proteção 92H2-(N) /Substituição dos TCs de Proteção 92H2-1(A/B/C). RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC2 CE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC1 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC1 CE | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 1/30/2013 | 2/2/2043 | R$7,322.74 | 6/1/2025 | Ativa | Substituição da Chave seccionadora 32H1-4.Reforço autorizado pela REA 2040/2009. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC1 CE | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 4/9/2013 | 8/16/2044 | R$8,944.09 | 6/1/2025 | Ativa | Substituição do TC de Proteção 92H1-(N). RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC1 CE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC1 CE | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/3/2021 | 10/6/2051 | R$11,315.17 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 230 kV TR 230/69 kV DELM. GOUVEIA TR4 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR4 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 230 kV TR 230/69 kV DELM. GOUVEIA TR4 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR4 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$454,511.36 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 230 kV TR 230/69 kV DELM. GOUVEIA TR3 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 230 kV TR 230/69 kV DELM. GOUVEIA TR3 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR3 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$454,511.36 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 230 kV TR 230/69 kV DELM. GOUVEIA TR3 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR3 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/17/2019 | 7/14/2047 | R$84,873.94 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 230 kV TR 230/69 kV DELM. GOUVEIA TR2 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 230 kV TR 230/69 kV DELM. GOUVEIA TR2 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$454,511.36 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 230 kV TR 230/69 kV DELM. GOUVEIA TR2 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR2 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/29/2019 | 2/9/2047 | R$68,539.18 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 230 kV TR 230/69 kV DELM. GOUVEIA TR1 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 230 kV TR 230/69 kV DELM. GOUVEIA TR1 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$454,511.36 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 230 kV TR 230/69 kV DELM. GOUVEIA TR1 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR1 CE | 061/2001 | IPCA | RMEL | REN 443/2011 | 6/26/2017 | 6/29/2047 | R$3,053.26 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE ISOLADORES DE VIDRO POR PORCELANA, EM ATENDIMENTO A RECOMENDAÇÃO RAP ONS 0053/2013, DA CHAVE SECCIONADORA, POSIÇÃO 34T1-4 DA SUB DELMIRO GOUVEIA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 230 kV TR 230/69 kV DELM. GOUVEIA TR1 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR1 CE | 061/2001 | IPCA | RMEL | REN 443/2011 | 6/25/2017 | 6/28/2047 | R$3,053.00 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE ISOLADORES DE VIDRO POR PORCELANA, EM ATENDIMENTO A RECOMENDAÇÃO RAP ONS 0053/2013, DA CHAVE SECCIONADORA, POSIÇÃO 34T1-5 DA SUB DELMIRO GOUVEIA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 230 kV TR 230/69 kV DELM. GOUVEIA TR1 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR1 CE | 061/2001 | IPCA | RMEL | REN 443/2011 | 6/25/2017 | 6/28/2047 | R$3,053.00 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE ISOLADORES DE VIDRO POR PORCELANA, EM ATENDIMENTO A RECOMENDAÇÃO RAP ONS 0053/2013, DA CHAVE SECCIONADORA, POSIÇÃO 34T1-1 DA SUB DELMIRO GOUVEIA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 230 kV TR 230/69 kV DELM. GOUVEIA TR1 CE | RBF | FT TR 230/69 kV DELM. GOUVEIA TR1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/5/2020 | 1/7/2050 | R$41,548.29 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 230 kV BC 230 kV 50,5 Mvar DELM. GOUVEIA BC1 CE | RB | FT BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$180,695.93 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 230 kV BC 230 kV 50,5 Mvar DELM. GOUVEIA BC1 CE | RB | FT BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$507,063.31 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 230 kV BC 230 kV 50,5 Mvar DELM. GOUVEIA BC1 CE | RB | FT BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$467,450.42 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | MC 230 kV BC 230 kV 50,5 Mvar DELM. GOUVEIA BC1 CE | RB | FT BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/16/2018 | 3/26/2050 | R$245,898.55 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | IB 69 kV MG 230 kV DELM. GOUVEIA MG1 CE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | IB 69 kV MG 230 kV DELM. GOUVEIA MG1 CE IB1 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 1/30/2013 | 2/2/2043 | R$14,645.48 | 6/1/2025 | Ativa | Substituição da Chave seccionadora 32D1-1/2.Reforço autorizado pela REA 2040/2009. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | IB 69 kV MG 230 kV DELM. GOUVEIA MG1 CE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$118,244.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | IB 230 kV MG 230 kV DELM. GOUVEIA MG1 CE IB1 | RB | FT MG 230 kV DELM. GOUVEIA MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,085.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | IB 230 kV MG 230 kV DELM. GOUVEIA MG1 CE IB1 | RB | FT MG 230 kV DELM. GOUVEIA MG1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$373,459.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA TAUAPE 02J9 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA TAUAPE 02J9 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 1/30/2013 | 2/2/2043 | R$14,645.48 | 6/1/2025 | Ativa | Substituição da Chave seccionadora 32J9-4/6. Reforço autorizado pela REA 2040/2009. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA TAUAPE 02J9 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 3/13/2013 | 7/20/2044 | R$26,763.46 | 6/1/2025 | Ativa | Substituição dos TCs de Proteção 92J9-1(A/B/C). Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA TAUAPE 02J9 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA TAUAPE 02J9 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/10/2022 | 8/4/2049 | R$19,604.97 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA TAUAPE 02J9 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 1/30/2013 | 2/2/2043 | R$17,555.37 | 6/1/2025 | Ativa | Superação da capacidade de curto-circuito assimétrica da seccionadora 32J9-5 Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA TAUAPE 02J8 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA TAUAPE 02J8 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 12/30/2012 | 1/2/2043 | R$25,181.32 | 6/1/2025 | Ativa | Subst. 18 CS Superadas - 32J3-4/5/6/7 (EL FTZ) - 32J4-4/5/6/7 (EL FTZ) - 32J7-4/5/6/7 (EL CPE-TAUAPE) - 32J8-4/5/6/7 (EL CPE-TAUAPE) - 32N3-4/5/6 (EL Agua Fria). Reforço autorizado pela REA 2040/2009. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA TAUAPE 02J8 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 3/21/2013 | 7/28/2044 | R$26,783.85 | 6/1/2025 | Ativa | Substituição dos TCs de Proteção 92J8-1(A/B/C). Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA TAUAPE 02J8 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA TAUAPE 02J8 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/19/2019 | 3/15/2047 | R$18,214.97 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA TAUAPE 02J7 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA TAUAPE 02J7 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 12/30/2012 | 1/2/2043 | R$25,181.32 | 6/1/2025 | Ativa | Subst. 18 CS Superadas - 32J3-4/5/6/7 (EL FTZ) - 32J4-4/5/6/7 (EL FTZ) - 32J7-4/5/6/7 (EL CPE-TAUAPE) - 32J8-4/5/6/7 (EL CPE-TAUAPE) - 32N3-4/5/6 (EL Agua Fria). Reforço autorizado pela REA 2040/2009. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA TAUAPE 02J7 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 3/27/2013 | 8/3/2044 | R$26,799.15 | 6/1/2025 | Ativa | Substituição dos TCs de Proteção 92J7-1(A/B/C). Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA TAUAPE 02J7 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA TAUAPE 02J7 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA TAUAPE 02J7 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/13/2018 | 2/9/2046 | R$14,897.44 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA FORTALEZA 02J4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA FORTALEZA 02J4 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 12/30/2012 | 1/2/2043 | R$25,181.32 | 6/1/2025 | Ativa | Subst. 18 CS Superadas - 32J3-4/5/6/7 (EL FTZ) - 32J4-4/5/6/7 (EL FTZ) - 32J7-4/5/6/7 (EL CPE-TAUAPE) - 32J8-4/5/6/7 (EL CPE-TAUAPE) - 32N3-4/5/6 (EL Agua Fria). Reforço autorizado pela REA 2040/2009. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA FORTALEZA 02J4 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA FORTALEZA 02J4 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 7/3/2016 | 7/2/2040 | R$6,158.79 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE PARARAIOS, POSIÇÃO 72J4 FASE A,B e C DA SUB DELMIRO GOUVEIA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA FORTALEZA 02J3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA FORTALEZA 02J3 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 12/30/2012 | 1/2/2043 | R$25,181.32 | 6/1/2025 | Ativa | Subst. 18 CS Superadas - 32J3-4/5/6/7 (EL FTZ) - 32J4-4/5/6/7 (EL FTZ) - 32J7-4/5/6/7 (EL CPE-TAUAPE) - 32J8-4/5/6/7 (EL CPE-TAUAPE) - 32N3-4/5/6 (EL Agua Fria). Reforço autorizado pela REA 2040/2009. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA FORTALEZA 02J3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA FORTALEZA 02J3 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 12/20/2015 | 12/19/2039 | R$4,016.08 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE PARARAIOS, POSIÇÃO 72J3 FASES B E C DA SUB DELMIRO GOUVEIA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA FORTALEZA 02J3 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/28/2022 | 4/27/2050 | R$4,197.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA DIA MACEDO 02J6 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA DIA MACEDO 02J6 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA DIA MACEDO 02J6 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA DIA MACEDO 02J6 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 3/3/2013 | 3/2/2046 | R$19,482.40 | 6/1/2025 | Ativa | EL 69 kV DELM. GOUVEIA DIA MACEDO 02J6 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA DIA MACEDO 02J6 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 3/3/2013 | 7/5/2044 | R$26,624.88 | 6/1/2025 | Ativa | EL 69 kV DELM. GOUVEIA DIA MACEDO 02J6 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA DIA MACEDO 02J6 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/27/2022 | 12/26/2046 | R$8,268.83 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA ALDEOTA 02N1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA ALDEOTA 02N1 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 1/30/2013 | 2/2/2043 | R$43,957.63 | 6/1/2025 | Ativa | Substituição das Chaves seccionadoras 32N1-4/5/6 e substituição dos TCs de Proteção 92N1-1(A/B/C).Reforço autorizado pela REA 2040/2009. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA ALDEOTA 02N1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA ALDEOTA 02N1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/20/2022 | 12/19/2046 | R$8,263.71 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA AGUA FRIA 02N3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA AGUA FRIA 02N3 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 12/30/2012 | 1/2/2043 | R$25,181.32 | 6/1/2025 | Ativa | Subst. 18 CS Superadas - 32J3-4/5/6/7 (EL FTZ) - 32J4-4/5/6/7 (EL FTZ) - 32J7-4/5/6/7 (EL CPE-TAUAPE) - 32J8-4/5/6/7 (EL CPE-TAUAPE) - 32N3-4/5/6 (EL Agua Fria). Reforço autorizado pela REA 2040/2009. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA AGUA FRIA 02N3 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 4/9/2013 | 8/16/2044 | R$26,832.28 | 6/1/2025 | Ativa | Substituição do TC de Proteção 92N3-1(B) / Substituição dos TCs de Proteção 92N3-1(A/C).Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA AGUA FRIA 02N3 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 1/12/2016 | 1/11/2040 | R$2,162.17 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE PARARAIOS, POSIÇÃO 72N3 FASE B e C DA SUB DELMIRO GOUVEIA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA AGUA FRIA 02N2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA AGUA FRIA 02N2 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 2/5/2013 | 11/27/2045 | R$61,602.07 | 6/1/2025 | Ativa | Substituição da Chave seccionadora 32N2-4/5/6. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA AGUA FRIA 02N2 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 2/5/2013 | 6/14/2044 | R$26,671.66 | 6/1/2025 | Ativa | Substituição dos TCs de Proteção 92N2-1(A/C) / Substituição dos TCs de Proteção 92N2-2(A/C). Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 69 kV DELM. GOUVEIA AGUA FRIA 02N2 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 230 kV DELM. GOUVEIA LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE | RB | FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 230 kV DELM. GOUVEIA LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE | RB | FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 8/10/2014 | 8/18/2045 | R$17,575.50 | 6/1/2025 | Ativa | Revitalização Necessária: SUBSTITUIÇÃO DO TC BALTEAU 94F5 FASE A. Incluído no recurso contra a REH 2.098/2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 230 kV DELM. GOUVEIA LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE | RB | FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 230 kV DELM. GOUVEIA LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE | RB | FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 230 kV DELM. GOUVEIA LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE | RB | FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | EL 230 kV DELM. GOUVEIA LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE | RB | FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/8/2018 | 9/30/2048 | R$41,615.96 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | BC 69 kV 24,4 Mvar DELM. GOUVEIA BC4 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$121,448.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | BC 69 kV 24,4 Mvar DELM. GOUVEIA BC3 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$121,448.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | BC 69 kV 24,4 Mvar DELM. GOUVEIA BC2 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$121,448.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | BC 69 kV 24,4 Mvar DELM. GOUVEIA BC1 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$121,448.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | DELM. GOUVEIA | BC 230 kV 50,5 Mvar DELM. GOUVEIA BC1 CE | RB | FT BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$191,630.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | DELM. GOUVEIA | BC 230 kV 50,5 Mvar DELM. GOUVEIA BC1 CE | RB | FT BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$537,748.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DESTERRO | TR 230/138 kV DESTERRO TR1 SC | RBF | FT TR 230/138 kV DESTERRO TR1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$377,367.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DESTERRO | TR 230/138 kV DESTERRO ATF2 SC | RBF | FT TR 230/138 kV DESTERRO ATF2 SC | 057/2001 | IPCA | RBNI | REA 4802/2014 | 7/29/2016 | 3/9/2051 | R$ 1,622,296.55 | 6/1/2025 | Ativa | T2014-055 | Instalação, na Subestação Desterro, de um autotransformador trifásico 230/138/13,8 kV, de 150 MVA. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | DESTERRO | RTB 230 kV 50 Mvar DESTERRO RB2 SC | RB | FT RTB 230 kV 50 Mvar DESTERRO RB2 SC | 057/2001 | IPCA | RBNI | REA 7529/2018 | 12/23/2020 | 1/20/2056 | R$ 1,256,704.18 | 6/1/2025 | Ativa | T2018-067 | Instalação, na Subestação Desterro, do Reator de Barras 2, trifásico, 230 kV - 50 Mvar *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | DESTERRO | RTB 230 kV 50 Mvar DESTERRO RB1 SC | RB | FT RTB 230 kV 50 Mvar DESTERRO RB1 SC | 057/2001 | IPCA | RBNI | REA 7529/2018 | 12/23/2020 | 1/20/2056 | R$ 1,256,704.18 | 6/1/2025 | Ativa | T2018-067 | Instalação, na Subestação Desterro, do Reator de Barras 1, trifásico, 230 kV - 50 Mvar. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | DESTERRO | MG 230 kV DESTERRO MG1 SC | RB | FT MG 230 kV DESTERRO MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$401,281.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DESTERRO | MG 230 kV DESTERRO MG1 SC | RB | FT MG 230 kV DESTERRO MG1 SC | 057/2001 | IPCA | RBNI | REA 4802/2014 | 7/29/2016 | 7/2/2045 | R$186,730.99 | 6/1/2025 | Ativa | T2014-055 | Complementação do módulo geral da Subestação Desterro com um módulo de infraestrutura de manobra em 230 kV. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | DESTERRO | MG 230 kV DESTERRO MG1 SC | RB | FT MG 230 kV DESTERRO MG1 SC | 057/2001 | IPCA | RBNI | REA 4802/2014 | 7/29/2016 | 3/25/2045 | R$118,385.26 | 6/1/2025 | Ativa | T2014-055 | Complementação do módulo geral da Subestação Desterro com um módulo de infraestrutura de manobra em 138 kV. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | DESTERRO | MG 230 kV DESTERRO MG1 SC | RB | FT MG 230 kV DESTERRO MG1 SC | 057/2001 | IPCA | RBNI | REA 7529/2018 | 12/23/2020 | 4/16/2050 | R$464,009.84 | 6/1/2025 | Ativa | T2018-067 | Complementação do módulo geral da Subestação Desterro com a implantação de dois módulos de infraestrutura de manobra de 230 kV. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | DESTERRO | MG 230 kV DESTERRO MG1 SC | RB | FT MG 230 kV DESTERRO MG1 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 10/16/2019 | 9/14/2036 | R$36,228.32 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | DESTERRO | MG 230 kV DESTERRO MG1 SC | RB | FT MG 230 kV DESTERRO MG1 SC | 057/2001 | IPCA | RBNI | DSP 4033/2021 | 6/21/2021 | 6/20/2036 | R$5,864.54 | 6/1/2025 | Ativa | Substituição do sistema de registro de perturbações (RDP) para monitoração das tensões das barras de 138 kV.. Equipamento de tecnologia obsoleta. Final de vida útil. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | DESTERRO | MC 230 kV TR 230/138 kV DESTERRO TR1 SC | RBF | FT TR 230/138 kV DESTERRO TR1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DESTERRO | MC 230 kV TR 230/138 kV DESTERRO ATF2 SC | RBF | FT TR 230/138 kV DESTERRO ATF2 SC | 057/2001 | IPCA | RBNI | REA 4802/2014 | 7/29/2016 | 5/18/2047 | R$ 1,030,300.73 | 6/1/2025 | Ativa | T2014-055 | Instalação, na Subestação Desterro, de um módulo de conexão de transformador em 230 kV, arranjo barra dupla a quatro chaves. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | DESTERRO | MC 230 kV RTB 230 kV 50 Mvar DESTERRO RB2 SC | RB | FT RTB 230 kV 50 Mvar DESTERRO RB2 SC | 057/2001 | IPCA | RBNI | REA 7529/2018 | 12/23/2020 | 10/1/2048 | R$ 1,560,593.55 | 6/1/2025 | Ativa | T2018-067 | Instalação, na Subestação Desterro, e um módulo de conexão 230 kV arranjo BD4 para a conexão do Reator de Barras 2 230 kV - 50 Mvar *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | DESTERRO | MC 230 kV RTB 230 kV 50 Mvar DESTERRO RB1 SC | RB | FT RTB 230 kV 50 Mvar DESTERRO RB1 SC | 057/2001 | IPCA | RBNI | REA 7529/2018 | 12/23/2020 | 8/29/2046 | R$ 1,541,249.34 | 6/1/2025 | Ativa | T2018-067 | Instalação, na Subestação Desterro, e um módulo de conexão 230 kV arranjo BD4 para a conexão do Reator de Barras 1 230 kV - 50 Mvar *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | DESTERRO | MC 138 kV TR 230/138 kV DESTERRO TR1 SC | RBF | FT TR 230/138 kV DESTERRO TR1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$100,865.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DESTERRO | MC 138 kV TR 230/138 kV DESTERRO ATF2 SC | RBF | FT TR 230/138 kV DESTERRO ATF2 SC | 057/2001 | IPCA | RBNI | REA 4802/2014 | 7/29/2016 | 4/7/2047 | R$831,185.89 | 6/1/2025 | Ativa | T2014-055 | Instalação, na Subestação Desterro, de um módulo de conexão de transformador em 138 kV, arranjo barra dupla a quatro chaves. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | DESTERRO | IB 230 kV MG 230 kV DESTERRO MG1 SC IB1 | RB | FT MG 230 kV DESTERRO MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,146.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DESTERRO | IB 138 kV MG 230 kV DESTERRO MG1 SC IB2 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,027.82 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | DESTERRO | EL 230 kV DESTERRO LT 230 kV BIGUACU /DESTERRO C-1 SC | RB | FT LT 230 kV BIGUACU /DESTERRO C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DESTERRO | EL 138 kV DESTERRO DIST2 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$149,126.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | DESTERRO | EL 138 kV DESTERRO DIST1 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$149,126.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | DOURADOS | TR 230/138 kV DOURADOS TRR1 MS | RBF | FT TR 230/138 kV DOURADOS TRR1 MS | 057/2001 | IPCA | RBNI | REA 5969/2016 | 8/7/2017 | 12/31/2042 | R$345,365.32 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Autotransformador Trifásico 230/138 kV- 75 MVA, na SE Dourados, proveniente da SE Itajaí *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | DOURADOS | TR 230/138 kV DOURADOS TR5 MS | RBF | FT TR 230/138 kV DOURADOS TR5 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$280,729.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | TR 230/138 kV DOURADOS TR5 MS | RBF | FT TR 230/138 kV DOURADOS TR5 MS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$492,702.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | TR 230/138 kV DOURADOS TR5 MS | RBF | FT TR 230/138 kV DOURADOS TR5 MS | 057/2001 | IPCA | RMELP | REA 13930/2023 | R$ 2,135,845.21 | 6/1/2025 | Prevista | T2023-033 | Obra de Substituição Completa - Substituição do autotransformador trifásico com comutador sob carga, TF1, 230/138 kV, 75 MVA. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 1340/2021. | ||||
| AXIA Energia Sul | DOURADOS | TR 230/138 kV DOURADOS TR4 MS | RBF | FT TR 230/138 kV DOURADOS TR4 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$280,729.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | TR 230/138 kV DOURADOS TR3 MS | RBF | FT TR 230/138 kV DOURADOS TR3 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$280,729.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | TR 230/138 kV DOURADOS TR3 MS | RBF | FT TR 230/138 kV DOURADOS TR3 MS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$492,702.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | TR 230/138 kV DOURADOS TR3 MS | RBF | FT TR 230/138 kV DOURADOS TR3 MS | 057/2001 | IPCA | RMELP | REA 13930/2023 | R$ 2,135,845.21 | 6/1/2025 | Prevista | T2023-034 | Obra de Substituição Completa - Substituição do autotransformador trifásico com comutador sob carga, TF3, 230/138 kV, 75 MVA. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 1349/2021 | ||||
| AXIA Energia Sul | DOURADOS | TR 230/138 kV DOURADOS TR2 MS | RBF | FT TR 230/138 kV DOURADOS TR2 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$280,729.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | TR 230/138 kV DOURADOS TR2 MS | RBF | FT TR 230/138 kV DOURADOS TR2 MS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$492,702.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | TR 230/138 kV DOURADOS TR2 MS | RBF | FT TR 230/138 kV DOURADOS TR2 MS | 057/2001 | IPCA | RMELP | REA 13930/2023 | R$ 2,135,845.21 | 6/1/2025 | Prevista | T2023-035 | Obra de Substituição Completa - Substituição do autotransformador trifásico com comutador sob carga, TF4, 230/138 kV, 75 MVA. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 1343/2021. | ||||
| AXIA Energia Sul | DOURADOS | RTL 230 kV 27 Mvar DOURADOS RT2 MS | RB | FT RTL 230 kV 27 Mvar DOURADOS RT2 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$296,495.91 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | RTL 230 kV 27 Mvar DOURADOS RT2 MS | RB | FT RTL 230 kV 27 Mvar DOURADOS RT2 MS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$520,374.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | RTL 230 kV 27 Mvar DOURADOS RT2 MS | RB | FT RTL 230 kV 27 Mvar DOURADOS RT2 MS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$440,766.42 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | RTB 230 kV 27 Mvar DOURADOS RT1 MS | RB | FT RTB 230 kV 27 Mvar DOURADOS RT1 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$196,325.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | RTB 230 kV 27 Mvar DOURADOS RT1 MS | RB | FT RTB 230 kV 27 Mvar DOURADOS RT1 MS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$344,567.25 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | RTB 230 kV 27 Mvar DOURADOS RT1 MS | RB | FT RTB 230 kV 27 Mvar DOURADOS RT1 MS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$291,854.47 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | RTB 230 kV 27 Mvar DOURADOS RT1 MS | RB | FT RTB 230 kV 27 Mvar DOURADOS RT1 MS | 057/2001 | IPCA | RBNIA | DSP 4920/2023 | R$ 1,311,335.80 | 6/1/2025 | Prevista | T2023-202 | Obra de Substituição Completa: Substituição do reator de barra RE1 de 27 Mvar em final de vida útil por um reator de barra trifásico de 50 Mvar / 230 kV na SE Dourados (Rotina-Substituição - IdeMdl 13440). | ||||
| AXIA Energia Sul | DOURADOS | MG 230 kV DOURADOS MG1 MS | RB | FT MG 230 kV DOURADOS MG1 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$497,004.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | MG 230 kV DOURADOS MG1 MS | RB | FT MG 230 kV DOURADOS MG1 MS | 057/2001 | IPCA | RMEL | REN 643/2014 | 3/22/2013 | 3/21/2030 | R$8,566.39 | 6/1/2025 | Ativa | Substituição de 2 baterias 125 Vcc.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | DOURADOS | MG 230 kV DOURADOS MG1 MS | RB | FT MG 230 kV DOURADOS MG1 MS | 057/2001 | IPCA | RMEL | REN 643/2014 | 10/17/2013 | 10/16/2030 | R$8,910.97 | 6/1/2025 | Ativa | Substituição de 2 baterias 125 Vcc.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | DOURADOS | MG 230 kV DOURADOS MG1 MS | RB | FT MG 230 kV DOURADOS MG1 MS | 057/2001 | IPCA | RBNI | REA 5744/2016 | 5/2/2018 | 6/29/2047 | R$195,015.25 | 6/1/2025 | Ativa | T2016-008 | Instalação de um módulo de infraestrutura de manobra, em 230 kV, na SE Dourados. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | DOURADOS | MG 230 kV DOURADOS MG1 MS | RB | FT MG 230 kV DOURADOS MG1 MS | 057/2001 | IPCA | RBNI | REA 5744/2016 | 5/2/2018 | 5/1/2033 | R$50,828.23 | 6/1/2025 | Ativa | T2016-008 | Adequação na SE DOURADOS, do Módulo Geral MG1, para instalação de dois painéis de Serviços Auxiliares e um Painel UCS. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | DOURADOS | MG 230 kV DOURADOS MG1 MS | RB | FT MG 230 kV DOURADOS MG1 MS | 057/2001 | IPCA | RMEL | REN 905/2020 | 2/26/2020 | 9/19/2037 | R$58,803.61 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | DOURADOS | MC 230 kV TR 230/138 kV DOURADOS TR5 MS | RBF | FT TR 230/138 kV DOURADOS TR5 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | MC 230 kV TR 230/138 kV DOURADOS TR4 MS | RBF | FT TR 230/138 kV DOURADOS TR4 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | MC 230 kV TR 230/138 kV DOURADOS TR4 MS | RBF | FT TR 230/138 kV DOURADOS TR4 MS | 057/2001 | IPCA | RBNI | REA 5744/2016 | 5/2/2018 | 5/1/2046 | R$58,934.69 | 6/1/2025 | Ativa | T2016-008 | Adequação, na SE DOURADOS, de um módulo de conexão, em 230 kV, para a transformação TR 230/138 kV DOURADOS TR4 MS, que instala a proteção diferencial de barra adaptativa associada à proteção de falha de disjuntor. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | DOURADOS | MC 230 kV TR 230/138 kV DOURADOS TR4 MS | RBF | FT TR 230/138 kV DOURADOS TR4 MS | 057/2001 | IPCA | RBNI | DSP 386/2021 | 2/17/2021 | 2/16/2049 | R$7,554.16 | 6/1/2025 | Ativa | Instalação de um novo sistema de registro de perturbações (RDP) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | DOURADOS | MC 230 kV TR 230/138 kV DOURADOS TR3 MS | RBF | FT TR 230/138 kV DOURADOS TR3 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | MC 230 kV TR 230/138 kV DOURADOS TR3 MS | RBF | FT TR 230/138 kV DOURADOS TR3 MS | 057/2001 | IPCA | RBNI | DSP 386/2021 | 2/17/2021 | 2/16/2049 | R$64,095.38 | 6/1/2025 | Ativa | Instalação de um novo sistema de registro de perturbações (RDP) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | DOURADOS | MC 230 kV TR 230/138 kV DOURADOS TR2 MS | RBF | FT TR 230/138 kV DOURADOS TR2 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | MC 230 kV RTL 230 kV 27 Mvar DOURADOS RT2 MS | RB | FT RTL 230 kV 27 Mvar DOURADOS RT2 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$79,479.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | MC 230 kV RTL 230 kV 27 Mvar DOURADOS RT2 MS | RB | FT RTL 230 kV 27 Mvar DOURADOS RT2 MS | 057/2001 | IPCA | RBNI | DSP 386/2021 | 2/17/2021 | 2/16/2049 | R$70,137.00 | 6/1/2025 | Ativa | Instalação de um novo sistema de registro de perturbações (RDP) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | DOURADOS | MC 230 kV RTB 230 kV 27 Mvar DOURADOS RT1 MS | RB | FT RTB 230 kV 27 Mvar DOURADOS RT1 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$127,875.60 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | MC 230 kV RTB 230 kV 27 Mvar DOURADOS RT1 MS | RB | FT RTB 230 kV 27 Mvar DOURADOS RT1 MS | 057/2001 | IPCA | RBNI | REA 5744/2016 | 5/2/2018 | 5/1/2046 | R$64,489.87 | 6/1/2025 | Ativa | T2016-008 | Adequação, na SE DOURADOS, de um módulo de conexão com disjuntor, em 230kV, para o reator de barra RTB 230 kV 27 Mvar DOURADOS RT1 MS, que instala a proteção diferencial de barra adaptativa associada à proteção de falha de disjuntor. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | DOURADOS | MC 230 kV RTB 230 kV 27 Mvar DOURADOS RT1 MS | RB | FT RTB 230 kV 27 Mvar DOURADOS RT1 MS | 057/2001 | IPCA | RBNI | DSP 386/2021 | 2/17/2021 | 2/16/2049 | R$7,524.84 | 6/1/2025 | Ativa | Instalação de um novo sistema de registro de perturbações (RDP) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | DOURADOS | MC 230 kV BC 230 kV 50 Mvar DOURADOS BC2 MS | RB | FT BC 230 kV 50 Mvar DOURADOS BC2 MS | 057/2001 | IPCA | RBNI | REA 5744/2016 | 5/2/2018 | 2/16/2048 | R$ 1,452,703.34 | 6/1/2025 | Ativa | T2016-008 | Instalação, na SE DOURADOS, de um módulo de conexão para o BC 230 kV 50 Mvar DOURADOS BC2 MS , em 230 kV, arranjo BD4. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | DOURADOS | MC 230 kV BC 230 kV 50 Mvar DOURADOS BC1 MS | RB | FT BC 230 kV 50 Mvar DOURADOS BC1 MS | 057/2001 | IPCA | RBNI | REA 5744/2016 | 5/2/2018 | 7/23/2049 | R$ 1,484,339.85 | 6/1/2025 | Ativa | T2016-008 | Instalação, na SE DOURADOS, de um módulo de conexão para o BC 230 kV 50 Mvar DOURADOS BC1 MS , em 230 kV, arranjo BD4. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | DOURADOS | MC 138 kV TR 230/138 kV DOURADOS TR5 MS | RBF | FT TR 230/138 kV DOURADOS TR5 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$89,047.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | MC 138 kV TR 230/138 kV DOURADOS TR4 MS | RBF | FT TR 230/138 kV DOURADOS TR4 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$89,047.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | MC 138 kV TR 230/138 kV DOURADOS TR3 MS | RBF | FT TR 230/138 kV DOURADOS TR3 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$89,047.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | MC 138 kV TR 230/138 kV DOURADOS TR3 MS | RBF | FT TR 230/138 kV DOURADOS TR3 MS | 057/2001 | IPCA | RMEL | REN 905/2020 | 5/12/2020 | 5/11/2044 | R$20,101.03 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | DOURADOS | MC 138 kV TR 230/138 kV DOURADOS TR2 MS | RBF | FT TR 230/138 kV DOURADOS TR2 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$89,047.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | IB 230 kV MG 230 kV DOURADOS MG1 MS IB1 | RB | FT MG 230 kV DOURADOS MG1 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,146.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | IB 230 kV MG 230 kV DOURADOS MG1 MS IB1 | RB | FT MG 230 kV DOURADOS MG1 MS | 057/2001 | IPCA | RBNI | REA 5744/2016 | 5/2/2018 | 11/19/2046 | R$229,880.35 | 6/1/2025 | Ativa | T2016-008 | Adequação, na SE DOURADOS, dos TCs da interligação de barramentos IB1, em 230 kv, arranjo BD4. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | DOURADOS | EL 230 kV DOURADOS LT 230 kV DOURADOS /GUAIRA C-1 MS/PR | RB | FT LT 230 kV DOURADOS /GUAIRA C-1 MS/PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | EL 230 kV DOURADOS LT 230 kV DOURADOS /GUAIRA C-1 MS/PR | RB | FT LT 230 kV DOURADOS /GUAIRA C-1 MS/PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$331,586.21 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | EL 230 kV DOURADOS LT 230 kV DOURADOS /GUAIRA C-1 MS/PR | RB | FT LT 230 kV DOURADOS /GUAIRA C-1 MS/PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 2/23/2021 | 2/26/2051 | R$45,271.84 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | DOURADOS | EL 230 kV DOURADOS LT 230 kV ANASTACIO /DOURADOS C-1 MS | RB | FT LT 230 kV ANASTACIO /DOURADOS C-1 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | EL 230 kV DOURADOS LT 230 kV ANASTACIO /DOURADOS C-1 MS | RB | FT LT 230 kV ANASTACIO /DOURADOS C-1 MS | 057/2001 | IPCA | RBNI | REA 5744/2016 | 5/2/2018 | 5/1/2046 | R$80,800.85 | 6/1/2025 | Ativa | T2016-008 | Adequação, na SE DOURADOS, da entrada de linha, em 230 kV, para a LT 230 kV ANASTACIO /DOURADOS C-1 MS, arranjo BD4, que instala a proteção diferencial de barra adaptativa associada à proteção de falha de disjuntos. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | DOURADOS | EL 230 kV DOURADOS LT 230 kV ANASTACIO /DOURADOS C-1 MS | RB | FT LT 230 kV ANASTACIO /DOURADOS C-1 MS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$331,586.21 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | DOURADOS | EL 230 kV DOURADOS LT 230 kV ANASTACIO /DOURADOS C-1 MS | RB | FT LT 230 kV ANASTACIO /DOURADOS C-1 MS | 057/2001 | IPCA | RBNI | DSP 386/2021 | 2/17/2021 | 2/16/2049 | R$80,505.67 | 6/1/2025 | Ativa | Instalação de um novo sistema de registro de perturbações (RDP) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | DOURADOS | EL 230 kV DOURADOS LT 230 kV ANASTACIO /DOURADOS C-1 MS | RB | FT LT 230 kV ANASTACIO /DOURADOS C-1 MS | 057/2001 | IPCA | RMEL | REN 905/2020 | 5/13/2020 | 5/12/2044 | R$11,000.78 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | DOURADOS | BC 230 kV 50 Mvar DOURADOS BC2 MS | RB | FT BC 230 kV 50 Mvar DOURADOS BC2 MS | 057/2001 | IPCA | RBNI | REA 5744/2016 | 5/2/2018 | 5/1/2038 | R$437,374.05 | 6/1/2025 | Ativa | T2016-008 | Instalação, na SE DOURADOS, de um Banco de Capacitores BC2 em 230 kV - 50 Mvar. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | DOURADOS | BC 230 kV 50 Mvar DOURADOS BC1 MS | RB | FT BC 230 kV 50 Mvar DOURADOS BC1 MS | 057/2001 | IPCA | RBNI | REA 5744/2016 | 5/2/2018 | 9/2/2040 | R$433,592.68 | 6/1/2025 | Ativa | T2016-008 | Instalação, na SE DOURADOS, de um Banco de Capacitores BC1 em 230 kV - 50 Mvar. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | ELISEU MARTIN | TT 69/0 kV ELISEU MARTIN TA1 PI | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ELISEU MARTIN | TR 69/13,8 kV ELISEU MARTIN TR1 PI | RB | FT MG 230 kV ELISEU MARTIN MG1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ELISEU MARTIN | TR 230/69 kV ELISEU MARTIN TR2 PI | RBF | FT TR 230/69 kV ELISEU MARTIN TR2 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$247,202.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ELISEU MARTIN | TR 230/69 kV ELISEU MARTIN TR1 PI | RBF | FT TR 230/69 kV ELISEU MARTIN TR1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$247,202.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ELISEU MARTIN | MG 230 kV ELISEU MARTIN MG1 PI | RB | FT MG 230 kV ELISEU MARTIN MG1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$455,249.52 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ELISEU MARTIN | MG 230 kV ELISEU MARTIN MG1 PI | RB | FT MG 230 kV ELISEU MARTIN MG1 PI | 061/2001 | IPCA | RMEL | REN 443/2011 | 1/15/2016 | 1/14/2033 | R$2,705.01 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BATERIAS - 125Vcc * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ELISEU MARTIN | MG 230 kV ELISEU MARTIN MG1 PI | RB | FT MG 230 kV ELISEU MARTIN MG1 PI | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/30/2021 | 3/23/2038 | R$229,365.64 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ELISEU MARTIN | MC 69 kV TT 69/0 kV ELISEU MARTIN TA1 PI | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ELISEU MARTIN | MC 69 kV TR 69/13,8 kV ELISEU MARTIN TR1 PI | RB | FT MG 230 kV ELISEU MARTIN MG1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ELISEU MARTIN | MC 69 kV TR 230/69 kV ELISEU MARTIN TR2 PI | RBF | FT TR 230/69 kV ELISEU MARTIN TR2 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ELISEU MARTIN | MC 69 kV TR 230/69 kV ELISEU MARTIN TR1 PI | RBF | FT TR 230/69 kV ELISEU MARTIN TR1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ELISEU MARTIN | MC 230 kV TR 230/69 kV ELISEU MARTIN TR2 PI | RBF | FT TR 230/69 kV ELISEU MARTIN TR2 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,694.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ELISEU MARTIN | MC 230 kV TR 230/69 kV ELISEU MARTIN TR2 PI | RBF | FT TR 230/69 kV ELISEU MARTIN TR2 PI | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/7/2022 | 6/18/2041 | R$8,866.24 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ELISEU MARTIN | MC 230 kV TR 230/69 kV ELISEU MARTIN TR1 PI | RBF | FT TR 230/69 kV ELISEU MARTIN TR1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,694.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ELISEU MARTIN | MC 230 kV TR 230/69 kV ELISEU MARTIN TR1 PI | RBF | FT TR 230/69 kV ELISEU MARTIN TR1 PI | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/18/2022 | 1/8/2040 | R$6,899.95 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ELISEU MARTIN | IB 69 kV MG 230 kV ELISEU MARTIN MG1 PI IB2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ELISEU MARTIN | IB 230 kV MG 230 kV ELISEU MARTIN MG1 PI IB1 | RB | FT MG 230 kV ELISEU MARTIN MG1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,085.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ELISEU MARTIN | EL 69 kV ELISEU MARTIN BOM JESUS-02L3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ELISEU MARTIN | EL 69 kV ELISEU MARTIN BOM JESUS-02L3 | DIT | 061/2001 | IPCA | RCDM | REN 905/2020 | 9/6/2012 | 4/29/2042 | R$375,993.83 | 6/1/2025 | Ativa | 1 EL 69 kV para Bom Jesus. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | ELISEU MARTIN | EL 69 kV ELISEU MARTIN BOM JESUS-02L2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ELISEU MARTIN | EL 69 kV ELISEU MARTIN BERTOLINEA-02L1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ELISEU MARTIN | EL 230 kV ELISEU MARTIN LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI | RB | FT LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ELISEU MARTIN | EL 230 kV ELISEU MARTIN LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI | RB | FT LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/1/2022 | 11/30/2037 | R$10,479.92 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ESTREITO | MG 345 kV ESTREITO MG1 MG | RB | FT MG 345 kV ESTREITO MG1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$689,105.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ESTREITO | IB 345 kV MG 345 kV ESTREITO MG1 MG IB1 | RB | FT MG 345 kV ESTREITO MG1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ESTREITO | EL 345 kV ESTREITO LT 345 kV ESTREITO /M. MORAES C-1 MG | RB | FT LT 345 kV ESTREITO /M. MORAES C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,201.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ESTREITO | EL 345 kV ESTREITO LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP | RB | FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,201.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ESTREITO | EL 345 kV ESTREITO LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP | RB | FT LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,201.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ESTREITO | EL 345 kV ESTREITO LT 345 kV ESTREITO /FURNAS C-1 MG | RB | FT LT 345 kV ESTREITO /FURNAS C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,201.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | TR 230/138 kV EUNAPOLIS TRR1 BA | RBF | FT TR 230/138 kV EUNAPOLIS TRR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$305,493.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | TR 230/138 kV EUNAPOLIS TR3 BA | RBF | FT TR 230/138 kV EUNAPOLIS TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,822.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | TR 230/138 kV EUNAPOLIS TR3 BA | RBF | FT TR 230/138 kV EUNAPOLIS TR3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/16/2022 | 11/23/2057 | R$ 360.98 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | EUNAPOLIS | TR 230/138 kV EUNAPOLIS TR2 BA | RBF | FT TR 230/138 kV EUNAPOLIS TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,822.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | TR 230/138 kV EUNAPOLIS TR2 BA | RBF | FT TR 230/138 kV EUNAPOLIS TR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,040,589.26 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | TR 230/138 kV EUNAPOLIS TR2 BA | RBF | FT TR 230/138 kV EUNAPOLIS TR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$959,296.16 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | TR 230/138 kV EUNAPOLIS TR1 BA | RBF | FT TR 230/138 kV EUNAPOLIS TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,822.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | TR 230/138 kV EUNAPOLIS TR1 BA | RBF | FT TR 230/138 kV EUNAPOLIS TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,040,589.26 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | TR 230/138 kV EUNAPOLIS TR1 BA | RBF | FT TR 230/138 kV EUNAPOLIS TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$959,296.16 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | RTL 230 kV 3,7 Mvar EUNAPOLIS RTR1 BA | RB | FT RTL 230 kV 3,7 Mvar EUNAPOLIS RTR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$60,865.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | RTL 230 kV 3,7 Mvar EUNAPOLIS RTR1 BA | RB | FT RTL 230 kV 3,7 Mvar EUNAPOLIS RTR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$170,797.94 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | RTL 230 kV 3,7 Mvar EUNAPOLIS RTR1 BA | RB | FT RTL 230 kV 3,7 Mvar EUNAPOLIS RTR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$157,454.84 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | RTL 230 kV 11,1 Mvar EUNAPOLIS RT2 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$182,595.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | RTL 230 kV 11,1 Mvar EUNAPOLIS RT2 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$512,393.84 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | RTL 230 kV 11,1 Mvar EUNAPOLIS RT2 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$472,364.51 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | RTL 230 kV 11,1 Mvar EUNAPOLIS RT1 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$182,595.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | RTL 230 kV 11,1 Mvar EUNAPOLIS RT1 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$512,393.84 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | RTL 230 kV 11,1 Mvar EUNAPOLIS RT1 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$472,364.51 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | RTB 230 kV 7,4 Mvar EUNAPOLIS RTR1 BA | RB | FT RTB 230 kV 7,4 Mvar EUNAPOLIS RTR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$102,477.93 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | RTB 230 kV 7,4 Mvar EUNAPOLIS RTR1 BA | RB | FT RTB 230 kV 7,4 Mvar EUNAPOLIS RTR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$287,570.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | RTB 230 kV 7,4 Mvar EUNAPOLIS RTR1 BA | RB | FT RTB 230 kV 7,4 Mvar EUNAPOLIS RTR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$265,104.77 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA | RB | FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$307,433.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA | RB | FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/14/2013 | 9/23/2049 | R$30,745.20 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BUCHAS HSP 230 KV TIPO OTF DOS REATORES 04E3 A/B/C E R. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | EUNAPOLIS | RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA | RB | FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$862,711.17 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA | RB | FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$795,314.30 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | MG 230 kV EUNAPOLIS MG1 BA | RB | FT MG 230 kV EUNAPOLIS MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$569,601.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | MG 230 kV EUNAPOLIS MG1 BA | RB | FT MG 230 kV EUNAPOLIS MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/30/2013 | 9/29/2030 | R$1,458.37 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCOS DE BATERIAS -48Vcc. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | EUNAPOLIS | MG 230 kV EUNAPOLIS MG1 BA | RB | FT MG 230 kV EUNAPOLIS MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/20/2015 | 12/19/2043 | R$9,579.01 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SWITCH.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | EUNAPOLIS | MG 230 kV EUNAPOLIS MG1 BA | RB | FT MG 230 kV EUNAPOLIS MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,598,399.01 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | MG 230 kV EUNAPOLIS MG1 BA | RB | FT MG 230 kV EUNAPOLIS MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,473,528.60 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | MG 230 kV EUNAPOLIS MG1 BA | RB | FT MG 230 kV EUNAPOLIS MG1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 3/1/2016 | 2/28/2033 | R$7,856.80 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BATERIAS - 125Vcc * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | EUNAPOLIS | MG 230 kV EUNAPOLIS MG1 BA | RB | FT MG 230 kV EUNAPOLIS MG1 BA | 061/2001 | IPCA | RBNI | REA 8328/2019 | 6/17/2024 | 6/16/2055 | R$219,713.44 | 6/1/2025 | Ativa | T2019-068 | Módulo de Infraestrutura de Manobra 230 kV - Complementação do Módulo Geral associado à instalação do Banco de Capacitores de 20Mvar | ||
| AXIA Energia Nordeste | EUNAPOLIS | MG 230 kV EUNAPOLIS MG1 BA | RB | FT MG 230 kV EUNAPOLIS MG1 BA | 061/2001 | IPCA | RBNI | REA 7761/2019 | 7/28/2020 | 7/27/2048 | R$10,668.53 | 6/1/2025 | Ativa | Implantação de Sistema para acesso remoto a dispositivos de Proteção, Controle e Automação. Sistema composto de Painel com PCs Industriais (Concentrador e Firewall), Receptor GPS, Switch Gerenciável. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | EUNAPOLIS | MG 230 kV EUNAPOLIS MG1 BA | RB | FT MG 230 kV EUNAPOLIS MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/22/2021 | 11/21/2041 | R$654,840.09 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | EUNAPOLIS | MC 230 kV TR 230/138 kV EUNAPOLIS TR3 BA | RBF | FT TR 230/138 kV EUNAPOLIS TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | MC 230 kV TR 230/138 kV EUNAPOLIS TR3 BA | RBF | FT TR 230/138 kV EUNAPOLIS TR3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/22/2018 | 10/17/2046 | R$23,702.34 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | EUNAPOLIS | MC 230 kV TR 230/138 kV EUNAPOLIS TR2 BA | RBF | FT TR 230/138 kV EUNAPOLIS TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | MC 230 kV TR 230/138 kV EUNAPOLIS TR2 BA | RBF | FT TR 230/138 kV EUNAPOLIS TR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$410,719.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | MC 230 kV TR 230/138 kV EUNAPOLIS TR2 BA | RBF | FT TR 230/138 kV EUNAPOLIS TR2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/3/2019 | 3/9/2048 | R$71,697.00 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | EUNAPOLIS | MC 230 kV TR 230/138 kV EUNAPOLIS TR1 BA | RBF | FT TR 230/138 kV EUNAPOLIS TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | MC 230 kV TR 230/138 kV EUNAPOLIS TR1 BA | RBF | FT TR 230/138 kV EUNAPOLIS TR1 BA | 061/2001 | IPCA | RBNI | REA 4542/2014 | 11/24/2014 | 9/21/2046 | R$187,105.81 | 6/1/2025 | Ativa | T2014-004 | Adequar, na SE Eunápolis, módulo de conexão 230 kV, arranjo BPT, para possibilitar a conexão do quarto transformador 230/138 kV, 100 MVA, remanejado da SE Funil. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | EUNAPOLIS | MC 230 kV TR 230/138 kV EUNAPOLIS TR1 BA | RBF | FT TR 230/138 kV EUNAPOLIS TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$410,719.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | MC 230 kV TR 230/138 kV EUNAPOLIS TR1 BA | RBF | FT TR 230/138 kV EUNAPOLIS TR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/1/2018 | 7/31/2046 | R$27,988.17 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | EUNAPOLIS | MC 230 kV RTL 230 kV 11,1 Mvar EUNAPOLIS RT2 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$91,861.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | MC 230 kV RTL 230 kV 11,1 Mvar EUNAPOLIS RT2 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/2/2022 | 5/1/2037 | R$8,415.07 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | EUNAPOLIS | MC 230 kV RTL 230 kV 11,1 Mvar EUNAPOLIS RT1 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$91,861.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | MC 230 kV RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA | RB | FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$140,466.92 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | MC 230 kV RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA | RB | FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$394,173.90 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | MC 230 kV RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA | RB | FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2017 | 11/22/2046 | R$42,180.74 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | EUNAPOLIS | MC 230 kV BC 230 kV 20 Mvar EUNAPOLIS BC1 BA | RB | FT BC 230 kV 20 Mvar EUNAPOLIS BC1 BA | 061/2001 | IPCA | RBNI | REA 8328/2019 | 6/17/2024 | 6/16/2052 | R$ 1,094,314.41 | 6/1/2025 | Ativa | T2019-068 | Instalação de módulo de manobra CCD em 230 kV, arranjo BPT, associado à instalação do Banco de Capacitores de 20 Mvar | ||
| AXIA Energia Nordeste | EUNAPOLIS | MC 138 kV TR 230/138 kV EUNAPOLIS TR3 BA | RBF | FT TR 230/138 kV EUNAPOLIS TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$112,381.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | MC 138 kV TR 230/138 kV EUNAPOLIS TR3 BA | RBF | FT TR 230/138 kV EUNAPOLIS TR3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/1/2022 | 2/4/2052 | R$18,521.60 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | EUNAPOLIS | MC 138 kV TR 230/138 kV EUNAPOLIS TR2 BA | RBF | FT TR 230/138 kV EUNAPOLIS TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$112,381.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | MC 138 kV TR 230/138 kV EUNAPOLIS TR2 BA | RBF | FT TR 230/138 kV EUNAPOLIS TR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$315,361.86 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | MC 138 kV TR 230/138 kV EUNAPOLIS TR1 BA | RBF | FT TR 230/138 kV EUNAPOLIS TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$112,381.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | MC 138 kV TR 230/138 kV EUNAPOLIS TR1 BA | RBF | FT TR 230/138 kV EUNAPOLIS TR1 BA | 061/2001 | IPCA | RBNI | REA 4542/2014 | 11/24/2014 | 3/2/2047 | R$188,774.90 | 6/1/2025 | Ativa | T2014-004 | Adequar, na SE Eunápolis, módulo de conexão 138 kV, arranjo BPT, para possibilitar a conexão do quarto transformador 230/138 kV, 100 MVA, remanejado da SE Funil. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | EUNAPOLIS | MC 138 kV TR 230/138 kV EUNAPOLIS TR1 BA | RBF | FT TR 230/138 kV EUNAPOLIS TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$315,361.86 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | MC 138 kV TR 230/138 kV EUNAPOLIS TR1 BA | RBF | FT TR 230/138 kV EUNAPOLIS TR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/3/2022 | 5/5/2052 | R$50,354.13 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | EUNAPOLIS | IB 230 kV MG 230 kV EUNAPOLIS MG1 BA IB1 | RB | FT MG 230 kV EUNAPOLIS MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,837.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | IB 230 kV MG 230 kV EUNAPOLIS MG1 BA IB1 | RB | FT MG 230 kV EUNAPOLIS MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$325,059.40 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | IB 230 kV MG 230 kV EUNAPOLIS MG1 BA IB1 | RB | FT MG 230 kV EUNAPOLIS MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$299,665.05 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | IB 230 kV MG 230 kV EUNAPOLIS MG1 BA IB1 | RB | FT MG 230 kV EUNAPOLIS MG1 BA | 061/2001 | IPCA | RBNI | REA 8328/2019 | 6/17/2024 | 6/16/2052 | R$271,932.19 | 6/1/2025 | Ativa | T2019-068 | Substituição de disjuntor e equipamentos associados ao módulo de Interligação de Barras 230 kV - SE Eunápolis. | ||
| AXIA Energia Nordeste | EUNAPOLIS | IB 138 kV MG 230 kV EUNAPOLIS MG1 BA IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$86,825.51 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | EUNAPOLIS | IB 138 kV MG 230 kV EUNAPOLIS MG1 BA IB1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$243,647.04 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | EUNAPOLIS | EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$596,907.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$550,275.38 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 4/3/2016 | 4/6/2046 | R$42,931.66 | 6/1/2025 | Ativa | SUBSTITUIÇAO DE TC NISSIN 230KV * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018. RAP alterada no recurso apresentado face a REH 2.258/2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | EUNAPOLIS | EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/21/2017 | 12/20/2045 | R$30,148.71 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | EUNAPOLIS | EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$596,907.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$550,275.38 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | EUNAPOLIS | EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 3/20/2016 | 3/23/2046 | R$12,581.72 | 6/1/2025 | Ativa | Substituído TPC TEM230H com desgaste prematuro por afundamento de tensão. Posição Operacional: 84N1-C/ENP. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | EUNAPOLIS | EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/21/2017 | 12/20/2045 | R$30,148.71 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | EUNAPOLIS | EL 230 kV EUNAPOLIS LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-2 BA | RB | FT LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-2 BA | 018/2009 | IPCA | RBL | CC 018/2009 | 8/3/2009 | 8/3/2039 | R$803,339.36 | 6/1/2025 | Ativa | T2009-224 | Contrato de Concessão nº018/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Nordeste | EUNAPOLIS | EL 230 kV EUNAPOLIS LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-1 BA | RB | FT LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-1 BA | 014/2008 | IPCA | RBL | CC 014/2008 | 10/16/2008 | 10/16/2038 | R$281,933.84 | 6/1/2025 | Ativa | T2000-256 | Contrato de Concessão nº 014/2008 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Nordeste | EUNAPOLIS | EL 138 kV EUNAPOLIS DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$167,571.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | EUNAPOLIS | EL 138 kV EUNAPOLIS DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$470,234.30 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | EUNAPOLIS | EL 138 kV EUNAPOLIS DIST3 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/27/2021 | 3/12/2051 | R$60,570.55 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | EUNAPOLIS | EL 138 kV EUNAPOLIS DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$167,571.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | EUNAPOLIS | EL 138 kV EUNAPOLIS DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$470,234.30 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | EUNAPOLIS | EL 138 kV EUNAPOLIS DIST2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/23/2021 | 4/16/2051 | R$62,733.58 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | EUNAPOLIS | EL 138 kV EUNAPOLIS DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$167,571.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | EUNAPOLIS | EL 138 kV EUNAPOLIS DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$470,234.30 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | EUNAPOLIS | EL 138 kV EUNAPOLIS DIST1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/20/2019 | 9/23/2048 | R$27,575.89 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | EUNAPOLIS | BC 230 kV 20 Mvar EUNAPOLIS BC1 BA | RB | FT BC 230 kV 20 Mvar EUNAPOLIS BC1 BA | 061/2001 | IPCA | RBNI | REA 8328/2019 | 6/17/2024 | 6/16/2048 | R$374,845.20 | 6/1/2025 | Ativa | T2019-068 | Instalação do Banco de Capacitores 20 Mvar na barra de 230 kV | ||
| AXIA Energia Nordeste | EXTREMOZ II | MG 230 kV EXTREMOZ II MG2 RN | RB | FT MG 230 kV EXTREMOZ II MG2 RN | 061/2001 | IPCA | RBNI | REA 3208/2011 | 12/9/2019 | 10/31/2048 | R$433,068.39 | 6/1/2025 | Ativa | T2011-151 | Complementar, na SE Extremoz II, o módulo de infraestrutura geral para a implantação de duas entradas de linha para atender ao seccionamento do circuito 2 da LT 230 kV Campina Grande II / Natal III. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | EXTREMOZ II | MG 230 kV EXTREMOZ II MG2 RN | RB | FT MG 230 kV EXTREMOZ II MG2 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/30/2021 | 4/19/2042 | R$108,839.49 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | EXTREMOZ II | MG 230 kV EXTREMOZ II MG1 RN | RB | FT MG 230 kV EXTREMOZ II MG1 RN | 019/2010 | IPCA | RBL | CC 019/2010 | 2/17/2014 | 11/23/2040 | R$588,309.08 | 6/1/2025 | Ativa | T2010-090-A | Rede Básica e ICGLT, CS, 230 kV Extremoz II - João Câmara; SE Extremoz II 230 kV; SE João Câmara 230/69 kV - 360 MVA (Rede Básica). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | EXTREMOZ II | MG 230 kV EXTREMOZ II MG1 RN | RB | FT MG 230 kV EXTREMOZ II MG1 RN | 019/2010 | IPCA | RMEL | REN 643/2014 | 3/31/2015 | 3/30/2030 | R$85,602.35 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE ACESSO REMOTO A DISPOSITIVOS DE PROTEÇÃO. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 21/06/2021) | |||
| AXIA Energia Nordeste | EXTREMOZ II | MG 230 kV EXTREMOZ II MG1 RN | RB | FT MG 230 kV EXTREMOZ II MG1 RN | 019/2010 | IPCA | RBNI | REA 8314/2019 | 8/31/2018 | 8/30/2033 | R$7,426.11 | 6/1/2025 | Ativa | Substituição do Concentrador de Dados (Sistema SCADA) para atendimento ao aumento da observabilidade associada ao Procedimento de Rede 2.7. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 | |||
| AXIA Energia Nordeste | EXTREMOZ II | MC 230 kV CE 150/-75 Mvar EXTREMOZ II CE1 RN | RB | FT CE 150/-75 Mvar EXTREMOZ II CE1 RN | 019/2010 | IPCA | RBL | CC 019/2010 | 2/17/2014 | 11/23/2040 | R$283,303.81 | 6/1/2025 | Ativa | T2010-090-A | Rede Básica e ICGLT, CS, 230 kV Extremoz II - João Câmara; SE Extremoz II 230 kV; SE João Câmara 230/69 kV - 360 MVA (Rede Básica). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | EXTREMOZ II | IB 230 kV MG 230 kV EXTREMOZ II MG1 RN IB1 | RB | FT MG 230 kV EXTREMOZ II MG1 RN | 019/2010 | IPCA | RBL | CC 019/2010 | 2/17/2014 | 11/23/2040 | R$210,589.86 | 6/1/2025 | Ativa | T2010-090-A | Rede Básica e ICGLT, CS, 230 kV Extremoz II - João Câmara; SE Extremoz II 230 kV; SE João Câmara 230/69 kV - 360 MVA (Rede Básica). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | EXTREMOZ II | EL 230 kV EXTREMOZ II LT 230 kV RIACHAO II /EXTREMOZ II C-1 RN | RB | FT LT 230 kV RIACHAO II /EXTREMOZ II C-1 RN | 061/2001 | IPCA | RBNI | REA 10141/2021 | 8/15/2016 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla a quatro chaves, na subestação Extremoz II, associada à linha de transmissão 230 kV Campina Grande II – Extremoz II. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | EXTREMOZ II | EL 230 kV EXTREMOZ II LT 230 kV RIACHAO II /EXTREMOZ II C-1 RN | RB | FT LT 230 kV RIACHAO II /EXTREMOZ II C-1 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2022 | 12/30/2037 | R$1,395.19 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | EXTREMOZ II | EL 230 kV EXTREMOZ II LT 230 kV EXTREMOZ II /NATAL III C-2 RN | RB | FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN | 061/2001 | IPCA | RBNI | REA 3208/2011 | 1/6/2020 | 10/11/2048 | R$ 1,564,670.81 | 6/1/2025 | Ativa | T2011-151 | Instalar, na SE Extremoz II, uma entrada de linha, em 230 kV, arranjo barra dupla a quatro chaves, para o circuito 2 da LT 230 kV Extremoz II / Natal III. (Nova configuração: Instalar, na SE EXTREMOZ II, um módulo de entrada de linha para o circuito LT 230 kV EXTREMOZ II /NATAL III C-1 RN originado do seccionamento do circuito LT 230 kV C.GRANDE III /NATAL III C-1 PB/RN na SE EXTREMOZ II). *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | EXTREMOZ II | EL 230 kV EXTREMOZ II LT 230 kV EXTREMOZ II /NATAL III C-2 RN | RB | FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2022 | 12/30/2037 | R$2,161.14 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | EXTREMOZ II | EL 230 kV EXTREMOZ II LT 230 kV EXTREMOZ II /NATAL III C-1 RN | RB | FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN | 061/2001 | IPCA | RBNI | REA 10141/2021 | 8/15/2016 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla a quatro chaves, na subestação Extremoz II, associada à linha de transmissão 230 kV Extremoz II – Natal III. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | EXTREMOZ II | EL 230 kV EXTREMOZ II LT 230 kV EXTREMOZ II /NATAL III C-1 RN | RB | FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2022 | 12/30/2037 | R$2,153.98 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | EXTREMOZ II | EL 230 kV EXTREMOZ II LT 230 kV CEARA MIRIM II /EXTREMOZ II C-2 RN | RB | FT LT 230 kV CEARA MIRIM II /EXTREMOZ II C-2 RN | 019/2010 | IPCA | RBL | CC 019/2010 | 2/17/2014 | 11/23/2040 | R$391,912.21 | 6/1/2025 | Ativa | T2010-090-A | Rede Básica e ICGLT, CS, 230 kV Extremoz II - João Câmara; SE Extremoz II 230 kV; SE João Câmara 230/69 kV - 360 MVA (Rede Básica). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | EXTREMOZ II | EL 230 kV EXTREMOZ II LT 230 kV CEARA MIRIM II /EXTREMOZ II C-1 RN | RB | FT LT 230 kV CEARA MIRIM II /EXTREMOZ II C-1 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$323,671.58 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | EXTREMOZ II | EL 230 kV EXTREMOZ II LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN | RB | FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN | 061/2001 | IPCA | RBNI | REA 3208/2011 | 1/6/2020 | 2/1/2049 | R$ 1,563,005.22 | 6/1/2025 | Ativa | T2011-151 | Instalar, na SE Extremoz II, uma entrada de linha, em 230 kV, arranjo barra dupla a quatro chaves, para o circuito 2 da LT 230 kV Campina Grande II / Extremoz II. (Nova configuração: Instalar, na SE EXTREMOZ II, um módulo de entrada de linha para o circuito LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN originado do seccionamento do circuito LT 230 kV C.GRANDE III /NATAL III C-1 PB/RN na SE EXTREMOZ II). *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | EXTREMOZ II | EL 230 kV EXTREMOZ II LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN | RB | FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2022 | 12/30/2037 | R$2,161.14 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | EXTREMOZ II | CE 150/-75 Mvar EXTREMOZ II CE1 RN | RB | FT CE 150/-75 Mvar EXTREMOZ II CE1 RN | 019/2010 | IPCA | RBL | CC 019/2010 | 2/17/2014 | 11/23/2040 | R$ 5,509,592.57 | 6/1/2025 | Ativa | T2010-090-A | Rede Básica e ICGLT, CS, 230 kV Extremoz II - João Câmara; SE Extremoz II 230 kV; SE João Câmara 230/69 kV - 360 MVA (Rede Básica). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia | F.IGUACU 50HZ | TR 500/127 kV F.IGUACU 50HZ TRZQ1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$607,572.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | TR 500/127 kV F.IGUACU 50HZ TRZP1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$607,572.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | TR 500/127 kV F.IGUACU 50HZ TRZM1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$607,572.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | TR 500/127 kV F.IGUACU 50HZ TRZL1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$607,572.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | TR 500/127 kV F.IGUACU 50HZ TRZH1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$607,572.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | TR 500/127 kV F.IGUACU 50HZ TRZG1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$607,572.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | TR 500/127 kV F.IGUACU 50HZ TRZE1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$607,572.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | TR 500/127 kV F.IGUACU 50HZ TRZD1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$607,572.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | MG 500 kV F.IGUACU 50HZ MG1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,424,597.11 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | MG 500 kV F.IGUACU 50HZ MG1 PR | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/6/2016 | 11/5/2040 | R$2,993.38 | 6/1/2025 | Ativa | Substituição de Para-raios PR SALI66MDFI fase A *Receita incluída no recurso contra a REH 2.407/2018 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 50HZ | MG 500 kV F.IGUACU 50HZ MG1 PR | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/6/2016 | 11/5/2040 | R$2,993.38 | 6/1/2025 | Ativa | Substituição de Para-raios PR SALI66MDFI fase B *Receita incluída no recurso contra a REH 2.407/2018 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 50HZ | MG 500 kV F.IGUACU 50HZ MG1 PR | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/6/2016 | 11/5/2040 | R$2,993.38 | 6/1/2025 | Ativa | Substituição de Para-raios PR SALI66MDFI fase C *Receita incluída no recurso contra a REH 2.407/2018 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 50HZ | MG 500 kV F.IGUACU 50HZ MG1 PR | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 8/21/2014 | 4/9/2033 | R$239,101.99 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | F.IGUACU 50HZ | MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR8 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR8 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,518,075.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR8 PR | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/2/2016 | 12/1/2040 | R$20,514.95 | 6/1/2025 | Ativa | Substituição de Para-raios PR PR13F31 fase A *Receita incluída no recurso contra a REH 2.407/2018 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 50HZ | MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR8 PR | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/2/2016 | 12/1/2040 | R$20,514.95 | 6/1/2025 | Ativa | Substituição de Para-raios PR PR13F31 fase B *Receita incluída no recurso contra a REH 2.407/2018 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 50HZ | MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR8 PR | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/2/2016 | 12/1/2040 | R$20,514.95 | 6/1/2025 | Ativa | Substituição de Para-raios PR PR13F31 fase C *Receita incluída no recurso contra a REH 2.407/2018 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 50HZ | MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR7 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR6 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR6 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,518,075.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR5 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR5 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,518,075.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR4 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR3 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR3 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,518,075.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR2 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | MC 500 kV BF 500 kV 349 Mvar F.IGUACU 50HZ 2-ZRB PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$403,058.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | MC 500 kV BF 500 kV 349 Mvar F.IGUACU 50HZ 2-ZRB PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,546,686.94 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | MC 500 kV BF 500 kV 349 Mvar F.IGUACU 50HZ 1-ZRA PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$403,058.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | MC 500 kV BF 500 kV 349 Mvar F.IGUACU 50HZ 1-ZRA PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,546,686.94 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | MC 500 kV BF 500 kV 280,3 Mvar F.IGUACU 50HZ 5-ZRE PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$403,058.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | MC 500 kV BF 500 kV 280,3 Mvar F.IGUACU 50HZ 5-ZRE PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,546,686.94 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | MC 500 kV BF 500 kV 280,3 Mvar F.IGUACU 50HZ 4-ZRD PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$403,058.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | MC 500 kV BF 500 kV 280,3 Mvar F.IGUACU 50HZ 4-ZRD PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,546,686.94 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | MC 500 kV BF 500 kV 280,3 Mvar F.IGUACU 50HZ 3-ZRC PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$403,058.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | MC 500 kV BF 500 kV 280,3 Mvar F.IGUACU 50HZ 3-ZRC PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,546,686.94 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB9 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB8 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB7 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB6 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB5 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB4 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB3 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB2 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB2 | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,611,003.01 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB11 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB10 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB1 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB1 | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,611,003.01 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | EL 600 kV F.IGUACU 50HZ LT 600 kV F.IGUACU 50HZ /IBIUNA C-4 PR/SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$707,119.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | EL 600 kV F.IGUACU 50HZ LT 600 kV F.IGUACU 50HZ /IBIUNA C-3 PR/SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$707,119.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | EL 600 kV F.IGUACU 50HZ LT 600 kV F.IGUACU 50HZ /IBIUNA C-2 PR/SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$707,119.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | EL 600 kV F.IGUACU 50HZ LT 600 kV F.IGUACU 50HZ /IBIUNA C-1 PR/SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$707,119.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | EL 500 kV F.IGUACU 50HZ LT 500 kV MARGEM DIREITA /F.IGUACU 50HZ C-2 RS/PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | EL 500 kV F.IGUACU 50HZ LT 500 kV MARGEM DIREITA /F.IGUACU 50HZ C-1 RS/PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | EL 500 kV F.IGUACU 50HZ LT 500 kV ITAIPU 50HZ /F.IGUACU 50HZ C-2 RS/PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | EL 500 kV F.IGUACU 50HZ LT 500 kV ITAIPU 50HZ /F.IGUACU 50HZ C-2 RS/PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,720,019.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | EL 500 kV F.IGUACU 50HZ LT 500 kV ITAIPU 50HZ /F.IGUACU 50HZ C-1 RS/PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CVR4 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 4,130,000.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CVR3 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 4,130,000.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CVR2 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 4,130,000.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CVR1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 4,130,000.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV8 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 12,390,002.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV8 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 47,545,111.70 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV8 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 50,970,904.93 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV8 PR | DIT | 062/2001 | IPCA | RMEL | REA 11324/2022 | 4/14/2022 | 4/13/2037 | R$ 1,634,519.01 | 6/1/2025 | Ativa | T2022-033 | Parcela de RAP referente à revitalização completa de transformador conversor reserva 500 kV. Não excluir a receita de O&M associada a PRT 579/2012 até a substituição do módulo completo da conversora. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV8 PR | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/31/2014 | 5/30/2038 | R$27,351.93 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV7 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 12,390,002.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV7 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 47,545,111.70 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV6 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 12,390,002.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV6 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 47,545,111.70 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV6 PR | DIT | 062/2001 | IPCA | RMEL | REA 11324/2022 | 4/14/2022 | 4/13/2037 | R$ 2,344,764.83 | 6/1/2025 | Ativa | T2022-033 | SE FOZ DO IGUAÇU: Revitalização completa do banco de transformadores conversores 500 kV (TR TRZD1 fase A). *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV5 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 12,390,002.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV5 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 47,545,111.70 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV5 PR | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 8/25/2017 | 6/19/2037 | R$1,719.29 | 6/1/2025 | Ativa | Substituição de transformador de corrente * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV5 PR | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 8/25/2017 | 6/19/2037 | R$1,719.30 | 6/1/2025 | Ativa | Substituição de transformador de corrente * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV5 PR | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 8/25/2017 | 6/19/2037 | R$1,719.30 | 6/1/2025 | Ativa | Substituição de transformador de corrente * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV5 PR | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 8/25/2017 | 6/19/2037 | R$1,719.30 | 6/1/2025 | Ativa | Substituição de transformador de corrente * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV4 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 12,390,002.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV4 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 47,545,111.70 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV4 PR | DIT | 062/2001 | IPCA | RMEL | REA 11324/2022 | 4/14/2022 | 4/13/2037 | R$ 2,378,065.12 | 6/1/2025 | Ativa | T2022-033 | Parcela de RAP referente à revitalização completa de transformador conversor, CV04 (sn: 7197211). Não excluir a receita de O&M associada a PRT 579/2012 até a substituição do módulo completo da conversora. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV4 PR | DIT | 062/2001 | IPCA | RMELP | REA 16051/2025 | R$ 7,387,594.43 | 6/1/2025 | Prevista | T2025-018 | Revitalização do transformador conversor 57844 para aumento de vida útil e atendimento à modernização do elo de corrente contínua de Furnas - DIT Itaipu. Equipamento atualmente na posição CV 600/600 kV F.IGUACU 50HZ CVR2 PR. Após a revitalização será movimentado para o bipolo 1, com previsão de instalação na posição CV 600/600 kV F.IGUACU 50HZ CV4 PR - TRZH1-C. | |||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV3 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 12,390,002.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV3 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 47,545,111.70 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV3 PR | DIT | 062/2001 | IPCA | RMEL | REA 11324/2022 | 4/14/2022 | 4/13/2037 | R$ 1,614,139.29 | 6/1/2025 | Ativa | T2022-033 | Parcela de RAP referente à revitalização completa de transformador conversor reserva 500 kV. Não excluir a receita de O&M associada a PRT 579/2012 até a substituição do módulo completo da conversora. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV2 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 12,390,002.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV2 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 47,545,111.70 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV2 PR | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 7/6/2017 | 3/31/2037 | R$ 380.88 | 6/1/2025 | Ativa | Substituição de transformador de corrente * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV2 PR | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 7/6/2017 | 3/31/2037 | R$ 380.88 | 6/1/2025 | Ativa | Substituição de transformador de corrente * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV2 PR | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 7/6/2017 | 3/31/2037 | R$ 380.88 | 6/1/2025 | Ativa | Substituição de transformador de corrente * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV2 PR | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 7/6/2017 | 3/31/2037 | R$ 380.88 | 6/1/2025 | Ativa | Substituição de transformador de corrente * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV2 PR | DIT | 062/2001 | IPCA | RMELP | REA 16051/2025 | R$ 6,749,269.13 | 6/1/2025 | Prevista | T2025-019 | Revitalização do transformador conversor 7197219 para aumento de vida útil e atendimento à modernização do elo de corrente contínua de Furnas - DIT Itaipu. Equipamento atualmente na posição CV 600/600 kV F.IGUACU 50HZ CV6 PR - TRZP1-B. Após a revitalização será movimentado para o bipolo 1, com previsão de instalação na posição CV 600/600 kV F.IGUACU 50HZ CV2 PR - TRZG1-A. | |||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 12,390,002.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV1 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 47,545,111.70 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV1 PR | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 5/16/2017 | 12/9/2036 | R$1,801.73 | 6/1/2025 | Ativa | Substituição de transformador de corrente * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV1 PR | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 5/16/2017 | 12/9/2036 | R$1,801.73 | 6/1/2025 | Ativa | Substituição de transformador de corrente * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV1 PR | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 5/16/2017 | 12/9/2036 | R$1,801.72 | 6/1/2025 | Ativa | Substituição de transformador de corrente * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 50HZ | CV 600/600 kV F.IGUACU 50HZ CV1 PR | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 5/16/2017 | 12/9/2036 | R$2,167.18 | 6/1/2025 | Ativa | Substituição de transformador de corrente * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 50HZ | BF 600 kV 1575 Mvar F.IGUACU 50HZ PO04 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,474,658.09 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | BF 600 kV 1575 Mvar F.IGUACU 50HZ PO03 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,474,658.09 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | BF 600 kV 1575 Mvar F.IGUACU 50HZ PO02 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,474,658.09 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | BF 600 kV 1575 Mvar F.IGUACU 50HZ PO01 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,474,658.09 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | BF 500 kV 349 Mvar F.IGUACU 50HZ 2-ZRB PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$368,664.52 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | BF 500 kV 349 Mvar F.IGUACU 50HZ 1-ZRA PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$368,664.52 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | BF 500 kV 280,3 Mvar F.IGUACU 50HZ 5-ZRE PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$349,761.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | BF 500 kV 280,3 Mvar F.IGUACU 50HZ 4-ZRD PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$349,761.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 50HZ | BF 500 kV 280,3 Mvar F.IGUACU 50HZ 3-ZRC PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$349,761.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | TT 69/0,24 kV F.IGUACU 60HZ AT5 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | TT 69/0,24 kV F.IGUACU 60HZ AT4 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | TT 69/0,24 kV F.IGUACU 60HZ AT3 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | TT 69/0,24 kV F.IGUACU 60HZ AT2 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | TT 69/0,24 kV F.IGUACU 60HZ AT1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | TR 750/500 kV F.IGUACU 60HZ TRR5 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$944,173.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | TR 750/500 kV F.IGUACU 60HZ TRR5 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,623,150.12 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | TR 750/500 kV F.IGUACU 60HZ TR5 PR | DIT | 062/2001 | IPCA | RCDM | REA 5012/2015 | 5/2/2019 | 9/24/2053 | R$ 9,584,045.96 | 6/1/2025 | Ativa | T2014-094 | Instalação, na Subestação Foz do Iguaçu, de um banco de autotransformadores 765/500 kV, de 3x550 MVA. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | F.IGUACU 60HZ | TR 750/500 kV F.IGUACU 60HZ TR4 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,832,520.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | TR 750/500 kV F.IGUACU 60HZ TR4 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 10,869,450.38 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | TR 750/500 kV F.IGUACU 60HZ TR4 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 11,652,632.67 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | TR 750/500 kV F.IGUACU 60HZ TR4 PR | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/25/2016 | 1/27/2046 | R$38,853.11 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | TR 750/500 kV F.IGUACU 60HZ TR3 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,832,520.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | TR 750/500 kV F.IGUACU 60HZ TR3 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 10,869,450.38 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | TR 750/500 kV F.IGUACU 60HZ TR3 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 11,652,632.67 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | TR 750/500 kV F.IGUACU 60HZ TR3 PR | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/16/2015 | 11/18/2045 | R$38,606.18 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | TR 750/500 kV F.IGUACU 60HZ TR2 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,832,520.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | TR 750/500 kV F.IGUACU 60HZ TR2 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 10,869,450.38 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | TR 750/500 kV F.IGUACU 60HZ TR2 PR | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 4/3/2016 | 5/15/2046 | R$40,114.99 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | TR 750/500 kV F.IGUACU 60HZ TR1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,832,520.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | TR 750/500 kV F.IGUACU 60HZ TR1 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 10,869,450.38 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | TR 750/500 kV F.IGUACU 60HZ TR1 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 11,652,632.67 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | TR 750/500 kV F.IGUACU 60HZ TR1 PR | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 2/7/2016 | 2/9/2046 | R$38,898.82 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | RTL 750 kV 330 Mvar F.IGUACU 60HZ RT3 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$994,906.32 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | RTL 750 kV 330 Mvar F.IGUACU 60HZ RT3 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,817,830.83 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | RTL 750 kV 330 Mvar F.IGUACU 60HZ RT3 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 4,092,919.03 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | RTL 750 kV 330 Mvar F.IGUACU 60HZ RT2 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$994,906.32 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | RTL 750 kV 330 Mvar F.IGUACU 60HZ RT2 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,817,830.83 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | RTL 750 kV 330 Mvar F.IGUACU 60HZ RT2 PR | DIT | 062/2001 | IPCA | RMEL | REA 11449/2022 | 5/3/2022 | 3/29/2058 | R$ 1,424,956.51 | 6/1/2025 | Ativa | T2022-026 | Obra de Substituição Parcial - Substituir na SE F. Iguaçu (60Hz) a fase B do reator monofásico - RT2 - 750 kV - 1x110 MVAr por outra fase B de 1x110 MVAr. Parcela de RAP referente à troca da fase B do reator RT2. Não excluir a receita de O&M antiga até a entrada das três fases do equipamento. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | F.IGUACU 60HZ | RTL 750 kV 330 Mvar F.IGUACU 60HZ RT1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$994,906.32 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | RTL 750 kV 330 Mvar F.IGUACU 60HZ RT1 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,817,830.83 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | RTL 750 kV 330 Mvar F.IGUACU 60HZ RT1 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 4,092,919.03 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | RTL 750 kV 110 Mvar F.IGUACU 60HZ RTR1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$331,379.39 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MG 750 kV F.IGUACU 60HZ MG1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,491,985.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MG 750 kV F.IGUACU 60HZ MG1 PR | DIT | 062/2001 | IPCA | RCDM | REA 5012/2015 | 4/22/2019 | 11/26/2048 | R$963,066.51 | 6/1/2025 | Ativa | T2014-094 | Complementação do módulo geral da Subestação Foz do Iguaçu com um módulo de infraestrutura de manobra 765 kV *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | F.IGUACU 60HZ | MG 750 kV F.IGUACU 60HZ MG1 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 9,562,687.76 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MG 750 kV F.IGUACU 60HZ MG1 PR | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/31/2017 | 3/27/2033 | R$1,400.35 | 6/1/2025 | Ativa | Substituição de IHMs do Sistema de Supervisão e Controle Local (SAGE) por obsolescência ou por atualização tecnológica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | MG 750 kV F.IGUACU 60HZ MG1 PR | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/16/2015 | 12/11/2028 | R$6,718.04 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (004364/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | MG 750 kV F.IGUACU 60HZ MG1 PR | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/16/2015 | 12/11/2028 | R$6,718.04 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (008819/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | MG 750 kV F.IGUACU 60HZ MG1 PR | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/16/2015 | 12/11/2028 | R$6,718.04 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (010797/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | MG 750 kV F.IGUACU 60HZ MG1 PR | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/16/2015 | 12/11/2028 | R$6,718.04 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (013673/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | MG 750 kV F.IGUACU 60HZ MG1 PR | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/16/2015 | 12/11/2028 | R$6,718.04 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (004264/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | MG 750 kV F.IGUACU 60HZ MG1 PR | DIT | 062/2001 | IPCA | RCDM | REA 8314/2019 | 7/9/2019 | 7/8/2034 | R$14,952.87 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000436/2014. (FT: LT 765 kV FOZ DO IGUAÇU / IVAIPORA FURC 1 PR) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | MG 750 kV F.IGUACU 60HZ MG1 PR | DIT | 062/2001 | IPCA | RCDM | REA 8314/2019 | 7/9/2019 | 7/8/2034 | R$14,952.87 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000378/2014. (FT: LT 765 kV FOZ DO IGUAÇU/ IVAIPORA FUR C 2 PR) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | MG 750 kV F.IGUACU 60HZ MG1 PR | DIT | 062/2001 | IPCA | RCDM | REA 8314/2019 | 7/9/2019 | 7/8/2034 | R$14,952.87 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000376/2014. (FT: LT 765 kV FOZ DO IGUAÇU/ IVAIPORA FUR C 3 PR) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | MG 750 kV F.IGUACU 60HZ MG1 PR | DIT | 062/2001 | IPCA | RCDM | REA 8314/2019 | 7/9/2019 | 7/8/2034 | R$14,952.87 | 6/1/2025 | Ativa | Implantação de Unidade de Medição Fasorial – PMU e sistema de comunicação associado adicional para transmissão das medidas para o ONS, na barra da subestação. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | MG 750 kV F.IGUACU 60HZ MG1 PR | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/30/2018 | 6/5/2037 | R$ 1,450,109.08 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | MG 500 kV F.IGUACU 60HZ MG1 PR | RB | FT MG 500 kV F.IGUACU 60HZ MG1 PR | 062/2001 | IPCA | RBNI | REA 2069/2009 | 6/5/2012 | 4/13/2040 | R$695,395.63 | 6/1/2025 | Ativa | T2009-136 | Adicional de barramento de módulo de interligação de bays (IB), arranjo barra dupla com disjuntor e meio – DJM. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | F.IGUACU 60HZ | MG 500 kV F.IGUACU 60HZ MG1 PR | RB | FT MG 500 kV F.IGUACU 60HZ MG1 PR | 062/2001 | IPCA | RBNI | REA 2069/2009 | 6/5/2012 | 1/29/2041 | R$395,351.48 | 6/1/2025 | Ativa | T2009-136 | Adicional de barramento do módulo de entrada de linha (EL), arranjo barra dupla com disjuntor e meio – DJM, para futura LT 500 kV Foz do Iguaçu - Cascavel do Oeste.(Valores alterados pela REA 2.751, de 25.01.2011) *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | F.IGUACU 60HZ | MG 500 kV F.IGUACU 60HZ MG1 PR | RB | FT MG 500 kV F.IGUACU 60HZ MG1 PR | 062/2001 | IPCA | RBNI | REA 2069/2009 | 6/5/2012 | 8/10/2033 | R$859,311.02 | 6/1/2025 | Ativa | T2009-136 | Implantação do setor de 500 kV, arranjo DJM, com módulo de infraestrutura geral e módulo de infraestrutura de manobra referentes a 5 ELs 5 IBs e 4 CTs. (Valores alterados pela REA 2.751, de 25.01.2011) *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | F.IGUACU 60HZ | MG 500 kV F.IGUACU 60HZ MG1 PR | RB | FT MG 500 kV F.IGUACU 60HZ MG1 PR | 062/2001 | IPCA | RBNI | REA 5012/2015 | 4/22/2019 | 11/26/2048 | R$925,291.85 | 6/1/2025 | Ativa | T2014-094 | Complementação do módulo geral da Subestação Foz do Iguaçu com um módulo de infraestrutura de manobra 500 kV *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | F.IGUACU 60HZ | MG 500 kV F.IGUACU 60HZ MG1 PR | RB | FT MG 500 kV F.IGUACU 60HZ MG1 PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/18/2013 | 7/25/2044 | R$903,255.42 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | F.IGUACU 60HZ | MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR5 PR | DIT | 062/2001 | IPCA | RCDM | REA 5012/2015 | 5/2/2019 | 12/15/2049 | R$ 4,685,018.06 | 6/1/2025 | Ativa | T2014-094 | Instalação, na SE F.IGUACU 60HZ, de um módulo de conexão, em 750 kV, para o autotransformador TR 750/500 kV F.IGUACU 60HZ TR5 PR *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | F.IGUACU 60HZ | MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$622,784.52 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,389,859.14 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR | DIT | 062/2001 | IPCA | RCDM | REA 5484/2015 | 4/22/2019 | 4/21/2034 | R$41,398.53 | 6/1/2025 | Ativa | Troca da proteção do Banco de transformador es 765/525 kV (AT04) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 9/20/2018 | 9/19/2042 | R$97,779.41 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$622,784.52 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,389,859.14 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR | DIT | 062/2001 | IPCA | RCDM | REA 5484/2015 | 2/10/2021 | 2/9/2036 | R$52,734.64 | 6/1/2025 | Ativa | Troca da proteção do Banco de transformador es 765/525 kV (AT03) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/7/2021 | 3/6/2045 | R$106,763.61 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$622,784.52 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,389,859.14 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR | DIT | 062/2001 | IPCA | RCDM | REA 5484/2015 | 2/10/2021 | 2/9/2036 | R$43,296.38 | 6/1/2025 | Ativa | Troca da proteção do Banco de transformador es 765/525 kV (AT02) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 2/28/2021 | 2/27/2045 | R$106,693.60 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$622,784.52 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,389,859.14 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR | DIT | 062/2001 | IPCA | RCDM | REA 5484/2015 | 2/10/2021 | 2/9/2036 | R$70,353.29 | 6/1/2025 | Ativa | Troca da proteção do Banco de transformador es 765/525 kV (AT01) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 2/22/2021 | 2/21/2045 | R$106,633.58 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 750 kV RTL 750 kV 330 Mvar F.IGUACU 60HZ RT3 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,673.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 750 kV RTL 750 kV 330 Mvar F.IGUACU 60HZ RT2 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,673.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 750 kV RTL 750 kV 330 Mvar F.IGUACU 60HZ RT1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,673.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 69 kV TT 69/0,24 kV F.IGUACU 60HZ AT5 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 69 kV TT 69/0,24 kV F.IGUACU 60HZ AT4 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 69 kV TT 69/0,24 kV F.IGUACU 60HZ AT3 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 69 kV TT 69/0,24 kV F.IGUACU 60HZ AT2 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 69 kV TT 69/0,24 kV F.IGUACU 60HZ AT1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR5 PR | DIT | 062/2001 | IPCA | RCDM | REA 5012/2015 | 5/2/2019 | 1/26/2049 | R$ 2,720,296.29 | 6/1/2025 | Ativa | T2014-094 | Instalação, na SE F.IGUACU 60HZ, de um módulo de conexão, em 500 kV, para o autotransformador TR 750/500 kV F.IGUACU 60HZ TR5 PR *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | F.IGUACU 60HZ | MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR | DIT | 062/2001 | IPCA | RCDM | REA 2069/2009 | 6/15/2012 | 2/15/2039 | R$ 1,305,541.51 | 6/1/2025 | Ativa | T2009-136 | Instalação de um módulo de conexão de transformador (CT) em 500 kV, arranjo barra dupla com disjuntor e meio - DJM, para o banco de autotransformadores 765/500/20 kV AT04, existente. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | F.IGUACU 60HZ | MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,518,075.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR | DIT | 062/2001 | IPCA | RCDM | REA 5484/2015 | 4/22/2019 | 4/21/2034 | R$41,398.53 | 6/1/2025 | Ativa | Troca da proteção do Banco de transformador es 765/525 kV (AT04) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/3/2017 | 7/6/2047 | R$207,514.40 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,518,075.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR | DIT | 062/2001 | IPCA | RCDM | REA 5484/2015 | 2/10/2021 | 2/9/2036 | R$52,734.64 | 6/1/2025 | Ativa | Troca da proteção do Banco de transformador es 765/525 kV (AT03) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 9/21/2018 | 4/11/2046 | R$184,692.37 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR | DIT | 062/2001 | IPCA | RCDM | REA 2069/2009 | 2/27/2012 | 6/29/2038 | R$ 1,191,002.24 | 6/1/2025 | Ativa | T2009-136 | Instalação de um módulo de conexão de transformador (CT) em 500 kV, arranjo barra dupla com disjuntor e meio - DJM, para o banco de autotransformadores 765/500/20 kV AT02, existente. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | F.IGUACU 60HZ | MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,518,075.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR | DIT | 062/2001 | IPCA | RCDM | REA 5484/2015 | 2/10/2021 | 2/9/2036 | R$43,296.38 | 6/1/2025 | Ativa | Troca da proteção do Banco de transformador es 765/525 kV (AT02) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/23/2018 | 9/14/2046 | R$271,235.86 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,518,075.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR | DIT | 062/2001 | IPCA | RCDM | REA 5484/2015 | 2/10/2021 | 2/9/2036 | R$70,353.27 | 6/1/2025 | Ativa | Troca da proteção do Banco de transformador es 765/525 kV (AT01) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/4/2021 | 3/7/2051 | R$119,701.07 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | IB 750 kV MG 750 kV F.IGUACU 60HZ MG1 PR IB5 | DIT | 062/2001 | IPCA | RCDM | REA 5012/2015 | 4/22/2019 | 3/14/2051 | R$ 4,342,241.11 | 6/1/2025 | Ativa | T2014-094 | Instalação, na Subestação Foz do iguaçu, de um módulo de interligação de barras em 765 kV, arranjo disjuntor e meio. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | F.IGUACU 60HZ | IB 750 kV MG 750 kV F.IGUACU 60HZ MG1 PR IB4 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$748,462.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | IB 750 kV MG 750 kV F.IGUACU 60HZ MG1 PR IB3 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$748,462.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | IB 750 kV MG 750 kV F.IGUACU 60HZ MG1 PR IB2 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$748,462.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | IB 750 kV MG 750 kV F.IGUACU 60HZ MG1 PR IB1 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$748,462.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB5 | RB | FT MG 500 kV F.IGUACU 60HZ MG1 PR | 062/2001 | IPCA | RBNI | REA 5012/2015 | 4/22/2019 | 12/30/2050 | R$ 2,151,689.08 | 6/1/2025 | Ativa | T2014-094 | Instalação, na Subestação Foz do iguaçu, de um módulo de interligação de barras em 500 kV, arranjo disjuntor e meio. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | F.IGUACU 60HZ | IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB5 | RB | FT MG 500 kV F.IGUACU 60HZ MG1 PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/4/2021 | 3/7/2051 | R$42,519.92 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | F.IGUACU 60HZ | IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB4 | RB | FT MG 500 kV F.IGUACU 60HZ MG1 PR | 062/2001 | IPCA | RBNI | REA 2069/2009 | 6/15/2012 | 8/18/2039 | R$ 1,062,036.87 | 6/1/2025 | Ativa | T2009-136 | Instalação de um módulo de Interligação de Bays (IB) em 500 kV, arranjo barra dupla com disjuntor e meio – DJM, incluindo a substituição de 01 chave secionadora (9285), existente. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | F.IGUACU 60HZ | IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB4 | RB | FT MG 500 kV F.IGUACU 60HZ MG1 PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/10/2020 | 7/1/2050 | R$148,386.33 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | F.IGUACU 60HZ | IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB3 | RB | FT MG 500 kV F.IGUACU 60HZ MG1 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | F.IGUACU 60HZ | IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB3 | RB | FT MG 500 kV F.IGUACU 60HZ MG1 PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/4/2021 | 3/7/2051 | R$37,787.44 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | F.IGUACU 60HZ | IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB2 | RB | FT MG 500 kV F.IGUACU 60HZ MG1 PR | 062/2001 | IPCA | RBNI | REA 2069/2009 | 2/27/2012 | 2/1/2039 | R$ 1,098,505.99 | 6/1/2025 | Ativa | T2009-136 | Instalação de um módulo de Interligação de Bays (IB) em 500 kV, arranjo barra dupla com disjuntor e meio – DJM. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | F.IGUACU 60HZ | IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB2 | RB | FT MG 500 kV F.IGUACU 60HZ MG1 PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 9/17/2019 | 3/2/2050 | R$161,710.07 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | F.IGUACU 60HZ | IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB1 | RB | FT MG 500 kV F.IGUACU 60HZ MG1 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | F.IGUACU 60HZ | IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB1 | RB | FT MG 500 kV F.IGUACU 60HZ MG1 PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/19/2021 | 10/22/2051 | R$28,260.24 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | F.IGUACU 60HZ | EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$707,119.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,713,485.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,909,001.79 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR | DIT | 062/2001 | IPCA | RCDM | REA 5861/2016 | 7/9/2019 | 7/8/2034 | R$14,913.81 | 6/1/2025 | Ativa | LT 765kV Foz do Iguaçu - Ivaiporã C3 - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 2/8/2018 | 6/11/2043 | R$145,701.51 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$707,119.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,713,485.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR | DIT | 062/2001 | IPCA | RCDM | REA 5861/2016 | 7/9/2019 | 7/8/2034 | R$14,913.81 | 6/1/2025 | Ativa | LT 765kV Foz do Iguaçu - Ivaiporã C2 - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 2/27/2018 | 9/13/2043 | R$144,203.64 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$707,119.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,713,485.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR | DIT | 062/2001 | IPCA | RCDM | REA 5861/2016 | 7/9/2019 | 7/8/2034 | R$14,913.81 | 6/1/2025 | Ativa | LT 765kV Foz do Iguaçu - Ivaiporã C1 - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/10/2018 | 7/9/2033 | R$30,318.22 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | EL 500 kV F.IGUACU 60HZ EL4 | DIT | 062/2001 | IPCA | RCDM | REA 2069/2009 | 6/15/2012 | 4/7/2039 | R$857,839.90 | 6/1/2025 | Ativa | T2009-136 | Instalação de módulo de entrada de linha (EL) em 500 kV, arranjo barra dupla com disjuntor e meio – DJM, para o circuito 4 da linha de interligação da UHE Itaipu, incluindo a substituição de 01 chave secionadora (9287), 03 transformadores de corrente (TA 4) e 01 disjuntores (9284), existentes.(Valores alterados pela REA 2.751, de 25.01.2011) *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | F.IGUACU 60HZ | EL 500 kV F.IGUACU 60HZ EL4 | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 2/27/2018 | 4/10/2048 | R$371,176.68 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | EL 500 kV F.IGUACU 60HZ EL3 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | EL 500 kV F.IGUACU 60HZ EL3 | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/4/2021 | 3/7/2051 | R$75,574.88 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | EL 500 kV F.IGUACU 60HZ EL2 | DIT | 062/2001 | IPCA | RCDM | REA 2069/2009 | 2/27/2012 | 9/27/2038 | R$789,047.82 | 6/1/2025 | Ativa | T2009-136 | Instalação de módulo de entrada de linha (EL) em 500 kV, arranjo barra dupla com disjuntor e meio – DJM, para o circuito 2 da linha de interligação da UHE Itaipu, incluindo a substituição de 03 transformadores de corrente (TA 2) e 01 disjuntor (9264), existentes.(Valores alterados pela REA 2.751, de 25.01.2011) *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | F.IGUACU 60HZ | EL 500 kV F.IGUACU 60HZ EL2 | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/14/2014 | 7/7/2039 | R$746,699.87 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | F.IGUACU 60HZ | EL 500 kV F.IGUACU 60HZ EL1 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | F.IGUACU 60HZ | EL 500 kV F.IGUACU 60HZ EL1 | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/4/2021 | 5/26/2051 | R$74,093.54 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | FARROUPILHA | TR 230/69 kV FARROUPILHA TRR1 RS | RBF | FT TR 230/69 kV FARROUPILHA TRR1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$158,846.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | FARROUPILHA | TR 230/69 kV FARROUPILHA TR3 RS | RBF | FT TR 230/69 kV FARROUPILHA TR3 RS | 057/2001 | IPCA | RBNI | REA 6688/2017 | 7/3/2020 | 11/30/2054 | R$ 2,089,883.96 | 6/1/2025 | Ativa | T2017-069 | Instalar o terceiro transformador 230/69 kV - 88 MVA *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | FARROUPILHA | TR 230/69 kV FARROUPILHA TR2 RS | RBF | FT TR 230/69 kV FARROUPILHA TR2 RS | 057/2001 | IPCA | RMEL | REA 10921/2021 | 10/29/2024 | 10/28/2059 | R$ 2,335,659.73 | 6/1/2025 | Ativa | T2021-100 | Obra de Substituição Completa - Substituir na SE Farroupilha o transformador trifásico - TF2 - 230/69 kV - 88 MVA por outro de 88 MVA. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Sul | FARROUPILHA | TR 230/69 kV FARROUPILHA TR1 RS | RBF | FT TR 230/69 kV FARROUPILHA TR1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$288,756.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | FARROUPILHA | TR 230/69 kV FARROUPILHA TR1 RS | RBF | FT TR 230/69 kV FARROUPILHA TR1 RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$506,790.80 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | FARROUPILHA | MG 230 kV FARROUPILHA MG1 RS | RB | FT MG 230 kV FARROUPILHA MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$489,371.85 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | FARROUPILHA | MG 230 kV FARROUPILHA MG1 RS | RB | FT MG 230 kV FARROUPILHA MG1 RS | 057/2001 | IPCA | RBNI | REA 6688/2017 | 6/28/2020 | 8/9/2048 | R$50,290.20 | 6/1/2025 | Ativa | T2017-069 | Substituição de dois transformadores de Serviço Auxiliar 13,8 kV/380 V, de 225 kVA, por dois transformadores 13,8 kV/380 V, de 300 kVA. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | FARROUPILHA | MG 230 kV FARROUPILHA MG1 RS | RB | FT MG 230 kV FARROUPILHA MG1 RS | 057/2001 | IPCA | RBNI | REA 6688/2017 | 6/28/2020 | 7/1/2050 | R$10,575.02 | 6/1/2025 | Ativa | T2017-069 | Adequar Módulo Geral para implantação do 3º transformador 230/69 kV - 88 MVA com a implantação de casa de relé 230 kV. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | FARROUPILHA | MG 230 kV FARROUPILHA MG1 RS | RB | FT MG 230 kV FARROUPILHA MG1 RS | 057/2001 | IPCA | RBNI | REA 6688/2017 | 6/28/2020 | 12/17/2045 | R$457,710.57 | 6/1/2025 | Ativa | T2017-069 | Adequar o Módulo Geral para implantação do 3º transformador 230/69 kV - 88 MVA. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | FARROUPILHA | MG 230 kV FARROUPILHA MG1 RS | RB | FT MG 230 kV FARROUPILHA MG1 RS | 057/2001 | IPCA | RBNI | REA 5861/2016 | 12/20/2018 | 12/19/2033 | R$10,845.32 | 6/1/2025 | Ativa | Substituição de 2 Registradores de Perturbação (RDP) e instalação de mais 1 RDP * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 | |||
| AXIA Energia Sul | FARROUPILHA | MG 230 kV FARROUPILHA MG1 RS | RB | FT MG 230 kV FARROUPILHA MG1 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2022 | 6/9/2047 | R$177,384.10 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | FARROUPILHA | MC 69 kV TR 230/69 kV FARROUPILHA TR3 RS | RBF | FT TR 230/69 kV FARROUPILHA TR3 RS | 057/2001 | IPCA | RBNI | REA 6688/2017 | 7/3/2020 | 8/5/2048 | R$564,278.17 | 6/1/2025 | Ativa | T2017-069 | Instalação, na SE FARROUPILHA, de um módulo de conexão, em 69 kV, para o autotransformador TR 230/69 kV FARROUPILHA TR3 RS, com instalação de cabo isolado. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | FARROUPILHA | MC 69 kV TR 230/69 kV FARROUPILHA TR2 RS | RBF | FT TR 230/69 kV FARROUPILHA TR2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$48,587.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | FARROUPILHA | MC 69 kV TR 230/69 kV FARROUPILHA TR1 RS | RBF | FT TR 230/69 kV FARROUPILHA TR1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$48,587.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | FARROUPILHA | MC 230 kV TR 230/69 kV FARROUPILHA TR3 RS | RBF | FT TR 230/69 kV FARROUPILHA TR3 RS | 057/2001 | IPCA | RBNI | REA 6688/2017 | 7/3/2020 | 8/20/2048 | R$ 1,416,322.59 | 6/1/2025 | Ativa | T2017-069 | Instalação, na SE FARROUPILHA, de um módulo de conexão, em 230 kV, para o autotransformador TR 230/69 kV FARROUPILHA TR3 RS *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | FARROUPILHA | MC 230 kV TR 230/69 kV FARROUPILHA TR2 RS | RBF | FT TR 230/69 kV FARROUPILHA TR2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$140,136.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | FARROUPILHA | MC 230 kV TR 230/69 kV FARROUPILHA TR1 RS | RBF | FT TR 230/69 kV FARROUPILHA TR1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$126,634.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | FARROUPILHA | MC 230 kV TR 230/69 kV FARROUPILHA TR1 RS | RBF | FT TR 230/69 kV FARROUPILHA TR1 RS | 057/2001 | IPCA | RBNI | REA 5484/2015 | 9/28/2017 | 9/27/2050 | R$93,979.95 | 6/1/2025 | Ativa | Substituição de 3 disjuntor(es) do(s) vão(s): LT Monte Claro C1 (762); LT Monte Claro C2 (752); TF1 230/69 kV (732). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | FARROUPILHA | IB 230 kV MG 230 kV FARROUPILHA MG1 RS IB1 | RB | FT MG 230 kV FARROUPILHA MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,146.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | FARROUPILHA | EL 69 kV FARROUPILHA LT 69 kV FARROUPILHA 1 /FARROUPILHA C-2 RS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,961.27 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | FARROUPILHA | EL 69 kV FARROUPILHA LT 69 kV FARROUPILHA 1 /FARROUPILHA C-1 RS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,961.27 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | FARROUPILHA | EL 230 kV FARROUPILHA LT 230 kV GARIBALDI 1 /FARROUPILHA C-1 RS | RB | FT LT 230 kV GARIBALDI 1 /FARROUPILHA C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$195,444.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | FARROUPILHA | EL 230 kV FARROUPILHA LT 230 kV GARIBALDI 1 /FARROUPILHA C-1 RS | RB | FT LT 230 kV GARIBALDI 1 /FARROUPILHA C-1 RS | 057/2001 | IPCA | RMEL | REN 643/2014 | 10/20/2013 | 10/19/2037 | R$9,543.28 | 6/1/2025 | Ativa | Substituição dos para-raios 230 kV de SiC por ZnO do circuito Garibaldi 1.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | FARROUPILHA | EL 230 kV FARROUPILHA LT 230 kV GARIBALDI 1 /FARROUPILHA C-1 RS | RB | FT LT 230 kV GARIBALDI 1 /FARROUPILHA C-1 RS | 057/2001 | IPCA | RBNI | REA 5484/2015 | 9/25/2017 | 9/28/2047 | R$40,878.06 | 6/1/2025 | Ativa | Substituição de 9 transformador(es) de corrente do(s) vão(s): LT Monte Claro C1 (TC762); LT Monte Claro C2 (TC752); LT Garibaldi 1 (TC772). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | FARROUPILHA | EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /SCHARLAU C-1 RS | RB | FT LT 230 kV FARROUPILHA /SCHARLAU C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$195,444.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | FARROUPILHA | EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS | RB | FT LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$195,444.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | FARROUPILHA | EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS | RB | FT LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS | 057/2001 | IPCA | RBNI | REA 5484/2015 | 9/25/2017 | 9/28/2047 | R$40,878.06 | 6/1/2025 | Ativa | Substituição de 9 transformador(es) de corrente do(s) vão(s): LT Monte Claro C1 (TC762); LT Monte Claro C2 (TC752); LT Garibaldi 1 (TC772). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | FARROUPILHA | EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS | RB | FT LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS | 057/2001 | IPCA | RBNI | REA 5484/2015 | 9/28/2017 | 9/27/2050 | R$93,979.95 | 6/1/2025 | Ativa | Substituição de 3 disjuntor(es) do(s) vão(s): LT Monte Claro C1 (762); LT Monte Claro C2 (752); TF1 230/69 kV (732). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | FARROUPILHA | EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS | RB | FT LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$195,444.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | FARROUPILHA | EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS | RB | FT LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS | 057/2001 | IPCA | RBNI | REA 5484/2015 | 9/25/2017 | 9/28/2047 | R$40,878.06 | 6/1/2025 | Ativa | Substituição de 9 transformador(es) de corrente do(s) vão(s): LT Monte Claro C1 (TC762); LT Monte Claro C2 (TC752); LT Garibaldi 1 (TC772). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | FARROUPILHA | EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS | RB | FT LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS | 057/2001 | IPCA | RBNI | REA 5484/2015 | 9/28/2017 | 9/27/2050 | R$103,041.45 | 6/1/2025 | Ativa | Substituição de 3 disjuntor(es) do(s) vão(s): LT Monte Claro C1 (762); LT Monte Claro C2 (752); TF1 230/69 kV (732). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | FARROUPILHA | EL 230 kV FARROUPILHA LT 230 kV CAXIAS NORTE /FARROUPILHA C-2 RS | RB | FT LT 230 kV CAXIAS NORTE /FARROUPILHA C-2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$195,444.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | FARROUPILHA | EL 230 kV FARROUPILHA LT 230 kV CAXIAS NORTE /FARROUPILHA C-2 RS | RB | FT LT 230 kV CAXIAS NORTE /FARROUPILHA C-2 RS | 057/2001 | IPCA | RBNI | REA 9599/2021 | 5/9/2021 | 5/8/2054 | R$98,054.49 | 6/1/2025 | Ativa | Substituição de Disjuntor no vão Caxias 5(722) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | FARROUPILHA | EL 230 kV FARROUPILHA LT 230 kV CAXIAS NORTE /FARROUPILHA C-1 RS | RB | FT LT 230 kV CAXIAS NORTE /FARROUPILHA C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$195,444.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | FARROUPILHA | EL 230 kV FARROUPILHA LT 230 kV CAXIAS NORTE /FARROUPILHA C-1 RS | RB | FT LT 230 kV CAXIAS NORTE /FARROUPILHA C-1 RS | 057/2001 | IPCA | RBNI | REA 7761/2019 | 8/9/2021 | 8/12/2051 | R$24,233.55 | 6/1/2025 | Ativa | Substituição de 3 Transformador de Corrente(s) no vão Caxias2(CAX2) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | FARROUPILHA | EL 230 kV FARROUPILHA LT 230 kV CAXIAS /FARROUPILHA C-2 RS | RB | FT LT 230 kV CAXIAS /FARROUPILHA C-2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$195,444.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | FARROUPILHA | EL 230 kV FARROUPILHA LT 230 kV CAXIAS /FARROUPILHA C-2 RS | RB | FT LT 230 kV CAXIAS /FARROUPILHA C-2 RS | 057/2001 | IPCA | RMEL | REN 643/2014 | 2/2/2014 | 2/1/2038 | R$17,587.82 | 6/1/2025 | Ativa | Substituição dos para-raios 230 kV de SiC por ZnO do circuito Caxias 2. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | FARROUPILHA | EL 230 kV FARROUPILHA LT 230 kV CAXIAS /FARROUPILHA C-2 RS | RB | FT LT 230 kV CAXIAS /FARROUPILHA C-2 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 11/17/2019 | 11/28/2051 | R$147,527.83 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | FARROUPILHA | EL 230 kV FARROUPILHA LT 230 kV CAXIAS /FARROUPILHA C-1 RS | RB | FT LT 230 kV CAXIAS /FARROUPILHA C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$195,444.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | FARROUPILHA | EL 230 kV FARROUPILHA LT 230 kV CAXIAS /FARROUPILHA C-1 RS | RB | FT LT 230 kV CAXIAS /FARROUPILHA C-1 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 10/31/2021 | 10/30/2054 | R$108,567.56 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FEIRA DE SANTANA III | MG 230 kV FEIRA DE SANTANA III MG2 BA | RB | FT MG 230 kV FEIRA DE SANTANA III MG2 BA | 061/2001 | IPCA | RBNI | DSP 337/2023 | 9/26/2022 | 12/31/2042 | R$10,582.64 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 230 kV na SE Feira de Santana III, associado a entrada de linha 230 kV para a SE Camaçari II, em função do seccionamento da LT 230 kV Governador Mangabeira - Camaçari II C2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FEIRA DE SANTANA III | MG 230 kV FEIRA DE SANTANA III MG2 BA | RB | FT MG 230 kV FEIRA DE SANTANA III MG2 BA | 061/2001 | IPCA | RBNI | DSP 337/2023 | 9/26/2022 | 12/31/2042 | R$10,582.64 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 230 kV na SE Feira de Santana III, associado a entrada de linha 230 kV para a SE Governador Mangabeira, em função do seccionamento da LT 230 kV Governador Mangabeira - Camaçari II C2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FEIRA DE SANTANA III | EL 230 kV FEIRA DE SANTANA III LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RBNI | DSP 337/2023 | 9/26/2022 | 12/31/2042 | R$108,282.00 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo Barra Dupla a Quatro Chaves, na subestação Feira de Santana III, associada à Linha de Transmissão 230 kV Governador Mangabeira – Feira de Santana III C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FEIRA DE SANTANA III | EL 230 kV FEIRA DE SANTANA III LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-1 BA | RB | FT LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-1 BA | 061/2001 | IPCA | RBNI | DSP 337/2023 | 9/26/2022 | 12/31/2042 | R$108,282.00 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo Barra Dupla a Quatro Chaves, na subestação Feira de Santana III, associada à Linha de Transmissão 230 kV Feira de Santana III – Camaçari II C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | FERNAO DIAS | MG 500 kV FERNAO DIAS MG5 SP | RB | FT MG 500 kV FERNAO DIAS MG5 SP | 062/2001 | IPCA | RBNI | DSP 199/2023 | 1/26/2021 | 12/31/2042 | R$67,765.62 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 500 kV na SE Fernão Dias, associado as entradas de linha 500 kV para as SE´sCampinas e Cachoeira Paulista, em função do seccionamento da LT 500 kV Campinas - Cachoeira Paulista C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | FERNAO DIAS | IB 500 kV MG 500 kV FERNAO DIAS MG5 SP IB7 | RB | FT MG 500 kV FERNAO DIAS MG5 SP | 062/2001 | IPCA | RBNI | DSP 199/2023 | 1/26/2021 | 12/31/2042 | R$252,604.98 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Interligação de Barra em 500 kV, arranjo Disjuntor e Meio, na SE Fernão Dias, devido ao seccionamento da Linha de Transmissão 500 kV Campinas - Cachoeira Paulista na SE Fernão Dias. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | FERNAO DIAS | EL 500 kV FERNAO DIAS LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP | RB | FT LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP | 062/2001 | IPCA | RBNI | DSP 199/2023 | 1/26/2021 | 12/31/2042 | R$233,057.30 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV, arranjo Disjuntor e Meio, na subestação Fernão Dias, associada à Linha de Transmissão 500 kV Campinas – Fernão Dias C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | FERNAO DIAS | EL 500 kV FERNAO DIAS LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP | RB | FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP | 062/2001 | IPCA | RBNI | DSP 199/2023 | 1/26/2021 | 12/31/2042 | R$233,057.30 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV, arranjo Disjuntor e Meio, na subestação Fernão Dias, associada à Linha de Transmissão 500 kV Fernão Dias – Cachoeira Paulista C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FLORESTA II | MG 230 kV FLORESTA II MG1 PE | RB | FT MG 230 kV FLORESTA II MG1 PE | 061/2001 | IPCA | RBNI | REA 10264/2021 | 4/5/2019 | 12/31/2042 | R$28,004.23 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de um módulo de infraestrutura geral para acessante, incluindo terreno referente a 3 MIMs, em 230 kV, arranjo BD4, na Subestação Floresta II. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FLORESTA II | MG 230 kV FLORESTA II MG1 PE | RB | FT MG 230 kV FLORESTA II MG1 PE | 061/2001 | IPCA | RBNI | REA 10264/2021 | 4/5/2019 | 12/31/2042 | R$29,798.97 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de três módulos de infraestrutura, em 230 kV, arranjo BD4, na Subestação Floresta II. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FLORESTA II | MG 230 kV FLORESTA II MG1 PE | RB | FT MG 230 kV FLORESTA II MG1 PE | 061/2001 | IPCA | RBNIA | DSP 2563/2023 | R$180,403.11 | 6/1/2025 | Prevista | T2023-129 | Instalação de 1 Módulo de Infraestrutura de Manobra 230 kV na SE Floresta II, associado a Entrada de Linha 230 kV para a SE Bom Nome C3, em função do seccionamento da LT 230 kV Bom Nome - Paulo Afonso II C3. | ||||
| AXIA Energia Nordeste | FLORESTA II | MG 230 kV FLORESTA II MG1 PE | RB | FT MG 230 kV FLORESTA II MG1 PE | 061/2001 | IPCA | RBNIA | DSP 2563/2023 | R$180,403.11 | 6/1/2025 | Prevista | T2023-129 | Instalação de 1 Módulo de Infraestrutura de Manobra 230 kV na SE Floresta II, associado a Entrada de Linha 230 kV para a SE Paulo Afonso II C3, em função do seccionamento da LT 230 kV Bom Nome - Paulo Afonso II C3. | ||||
| AXIA Energia Nordeste | FLORESTA II | MG 230 kV FLORESTA II MG1 PE | RB | FT MG 230 kV FLORESTA II MG1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/9/2021 | 8/6/2044 | R$113,321.12 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FLORESTA II | IB 230 kV MG 230 kV FLORESTA II MG1 PE IB1 | RB | FT MG 230 kV FLORESTA II MG1 PE | 061/2001 | IPCA | RBNI | REA 10264/2021 | 4/5/2019 | 12/31/2042 | R$57,007.97 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de uma interligação de barramentos em 230 kV associada ao seccionamento da Linha de Transmissão 230 kV Paulo Afonso III – Bom Nome C-2. *(Receita revisada em 03/07/2024) | |||
| Nova Era Integração | FLORESTA II | EL 230 kV FLORESTA II LT 230 kV ZEBU III /FLORESTA II C-1 AL/PE | RB | FT LT 230 kV ZEBU III /FLORESTA II C-1 AL/PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,601,985.46 | 6/1/2025 | Prevista | T2024-197-A | LT 230 kV Zebu III - Floresta II - C1 | ||||
| AXIA Energia Nordeste | FLORESTA II | EL 230 kV FLORESTA II LT 230 kV P.AFONSO III /FLORESTA II C-2 AL/PE | RB | FT LT 230 kV P.AFONSO III /FLORESTA II C-2 AL/PE | 061/2001 | IPCA | RBNIA | DSP 2563/2023 | R$ 1,757,023.01 | 6/1/2025 | Prevista | T2023-129 | Instalar, na SE FLORESTA II, um módulo de entrada de linha para o circuito LT 230 kV P.AFONSO III /FLORESTA II C-3 AL/PE originado do seccionamento do circuito LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE na SE FLORESTA II. | ||||
| AXIA Energia Nordeste | FLORESTA II | EL 230 kV FLORESTA II LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE | RB | FT LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE | 061/2001 | IPCA | RBNI | REA 10264/2021 | 4/5/2019 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo BD4, na Subestação Floresta II, associada ao seccionamento da Linha de Transmissão 230 kV Paulo Afonso III – Bom Nome C-2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FLORESTA II | EL 230 kV FLORESTA II LT 230 kV FLORESTA II /BOM NOME C-2 PE | RB | FT LT 230 kV FLORESTA II /BOM NOME C-2 PE | 061/2001 | IPCA | RBNIA | DSP 2563/2023 | R$ 1,757,023.01 | 6/1/2025 | Prevista | T2023-129 | Instalar, na SE FLORESTA II, um módulo de entrada de linha para o circuito LT 230 kV FLORESTA II /BOM NOME C-3 PE originado do seccionamento do circuito LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE na SE FLORESTA II. | ||||
| AXIA Energia Nordeste | FLORESTA II | EL 230 kV FLORESTA II LT 230 kV FLORESTA II /BOM NOME C-1 PE | RB | FT LT 230 kV FLORESTA II /BOM NOME C-1 PE | 061/2001 | IPCA | RBNI | REA 10264/2021 | 4/5/2019 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo BD4, na Subestação Floresta II, associada ao seccionamento da Linha de Transmissão 230 kV Paulo Afonso III – Bom Nome C-2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FLORESTA II | EL 230 kV FLORESTA II LT 230 kV FLORESTA II /BOM NOME C-1 PE | RB | FT LT 230 kV FLORESTA II /BOM NOME C-1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/1/2017 | 6/4/2047 | R$57,577.75 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | FORQUILHINHA | MG 230 kV FORQUILHINHA MG2 SC | RB | FT MG 230 kV FORQUILHINHA MG2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,172.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | FORQUILHINHA | EL 230 kV FORQUILHINHA LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC | RB | FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | FORQUILHINHA | EL 230 kV FORQUILHINHA LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC | RB | FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC | 057/2001 | IPCA | RBNI | REA 5861/2016 | 4/29/2019 | 4/28/2036 | R$11,636.00 | 6/1/2025 | Ativa | Instalação de 1 carregador de bateria de 48 Vcc. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | FORQUILHINHA | EL 230 kV FORQUILHINHA LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC | RB | FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 5/8/2021 | 10/12/2036 | R$35,339.27 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | FORQUILHINHA | EL 230 kV FORQUILHINHA LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS | RB | FT LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | TT 69/13,8 kV FORTALEZA TA2 CE | DIT | 061/2001 | IPCA | RCDM | REA 3578/2012 | 11/27/2016 | 7/26/2047 | R$186,945.95 | 6/1/2025 | Ativa | Obra de Substituição Completa - Substituição do transformador de aterramento 02A2. (Potência: 7,5 MVA) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | TT 69/13,8 kV FORTALEZA TA1 CE | DIT | 061/2001 | IPCA | RCDM | REA 3578/2012 | 11/27/2016 | 7/26/2047 | R$186,945.95 | 6/1/2025 | Ativa | Obra de Substituição Completa - Substituição do transformador de aterramento 02A1. (Potência: 7,5 MVA) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | TT 26/0 kV FORTALEZA TT2 CE | RB | FT CE 100/-70 MvAr FORTALEZA CE1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | TT 26/0 kV FORTALEZA TT1 CE | RB | FT CE 100/-70 MvAr FORTALEZA CE1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | TR 69/13,8 kV FORTALEZA TR1 CE | RB | FT MG 230 kV FORTALEZA MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | TR 230/69 kV FORTALEZA TR5 CE | RBF | FT TR 230/69 kV FORTALEZA TR5 CE | 061/2001 | IPCA | RBNI | REA 6043/2016 | 3/3/2023 | 3/3/2057 | R$ 1,576,564.47 | 6/1/2025 | Ativa | T2016-062 | Instalação do quinto transformador na SE Fortaleza 230/69 kV - 100 MVA | ||
| AXIA Energia Nordeste | FORTALEZA | TR 230/69 kV FORTALEZA TR4 CE | RBF | FT TR 230/69 kV FORTALEZA TR4 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | TR 230/69 kV FORTALEZA TR4 CE | RBF | FT TR 230/69 kV FORTALEZA TR4 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | TR 230/69 kV FORTALEZA TR4 CE | RBF | FT TR 230/69 kV FORTALEZA TR4 CE | 061/2001 | IPCA | RMELP | REA 14107/2023 | R$ 2,443,200.76 | 6/1/2025 | Prevista | T2023-052 | Obra de Substituição Completa - Substituição do transformador 04T4 da SE FTZ. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 004525/2018 | ||||
| AXIA Energia Nordeste | FORTALEZA | TR 230/69 kV FORTALEZA TR4 CE | RBF | FT TR 230/69 kV FORTALEZA TR4 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/29/2021 | 6/6/2056 | R$93,149.71 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | TR 230/69 kV FORTALEZA TR3 CE | RBF | FT TR 230/69 kV FORTALEZA TR3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | TR 230/69 kV FORTALEZA TR3 CE | RBF | FT TR 230/69 kV FORTALEZA TR3 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | TR 230/69 kV FORTALEZA TR2 CE | RBF | FT TR 230/69 kV FORTALEZA TR2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | TR 230/69 kV FORTALEZA TR2 CE | RBF | FT TR 230/69 kV FORTALEZA TR2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | TR 230/69 kV FORTALEZA TR2 CE | RBF | FT TR 230/69 kV FORTALEZA TR2 CE | 061/2001 | IPCA | RMELP | REA 14107/2023 | R$ 2,443,200.76 | 6/1/2025 | Prevista | T2023-051 | Obra de Substituição Completa - Substituição do transformador 04T2 da SE FTZ. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 004508/2018 | ||||
| AXIA Energia Nordeste | FORTALEZA | TR 230/69 kV FORTALEZA TR2 CE | RBF | FT TR 230/69 kV FORTALEZA TR2 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/17/2021 | 7/25/2056 | R$63,238.40 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | TR 230/69 kV FORTALEZA TR1 CE | RBF | FT TR 230/69 kV FORTALEZA TR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | TR 230/69 kV FORTALEZA TR1 CE | RBF | FT TR 230/69 kV FORTALEZA TR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | TR 230/69 kV FORTALEZA TR1 CE | RBF | FT TR 230/69 kV FORTALEZA TR1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/15/2021 | 9/22/2056 | R$126,044.42 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | TR 230/26 kV FORTALEZA TR1 CE | RB | FT CE 100/-70 MvAr FORTALEZA CE1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$633,438.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | RTL 230 kV 10 Mvar FORTALEZA RT4 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$163,799.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | RTL 230 kV 10 Mvar FORTALEZA RT3 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$163,799.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | RTL 230 kV 10 Mvar FORTALEZA RT2 CE | RB | FT RTL 230 kV 10 Mvar FORTALEZA RT2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$163,799.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | RTL 230 kV 10 Mvar FORTALEZA RT1 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$163,799.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | RTL 230 kV 10 Mvar FORTALEZA RT1 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$459,650.17 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | RTB 230 kV 3,33 Mvar FORTALEZA RTR1 CE | RB | FT RTB 230 kV 3,33 Mvar FORTALEZA RTR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$54,539.90 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | RTB 230 kV 10 Mvar FORTALEZA RT5 CE | RB | FT RTB 230 kV 10 Mvar FORTALEZA RT5 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$163,799.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | RTB 230 kV 10 Mvar FORTALEZA RT5 CE | RB | FT RTB 230 kV 10 Mvar FORTALEZA RT5 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$459,650.17 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | RTB 13,8 kV 5 Mvar FORTALEZA RT2 CE | RBF | FT RTB 13,8 kV 5 Mvar FORTALEZA RT2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | RTB 13,8 kV 10 Mvar FORTALEZA RT1 CE | RBF | FT RTB 13,8 kV 10 Mvar FORTALEZA RT1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$143,640.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MG 230 kV FORTALEZA MG1 CE | RB | FT MG 230 kV FORTALEZA MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$764,784.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MG 230 kV FORTALEZA MG1 CE | RB | FT MG 230 kV FORTALEZA MG1 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 6/30/2015 | 6/29/2043 | R$62,496.34 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SISTEMAS AUTOMÁTICOS DE REGULAÇÃO ASSOCIADOS A TRANSFORMADORES..Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | MG 230 kV FORTALEZA MG1 CE | RB | FT MG 230 kV FORTALEZA MG1 CE | 061/2001 | IPCA | RBNI | REA 6043/2016 | 3/3/2023 | 3/3/2055 | R$76,526.71 | 6/1/2025 | Ativa | T2016-062 | Módulo de infraestrutura de manobra em 230 kV para instalação do quinto transformador 230/69 kV - 100 MVA na SE Fortaleza. | ||
| AXIA Energia Nordeste | FORTALEZA | MG 230 kV FORTALEZA MG1 CE | RB | FT MG 230 kV FORTALEZA MG1 CE | 061/2001 | IPCA | RBNI | REA 6043/2016 | 3/3/2023 | 3/3/2054 | R$60,654.14 | 6/1/2025 | Ativa | T2016-062 | Três módulos de infraestrutura de manobra em 69 kV para instalação do quinto transformador na SE Fortaleza | ||
| AXIA Energia Nordeste | FORTALEZA | MG 230 kV FORTALEZA MG1 CE | RB | FT MG 230 kV FORTALEZA MG1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,146,115.32 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MG 230 kV FORTALEZA MG1 CE | RB | FT MG 230 kV FORTALEZA MG1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,978,456.12 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MG 230 kV FORTALEZA MG1 CE | RB | FT MG 230 kV FORTALEZA MG1 CE | 061/2001 | IPCA | RMEL | REN 443/2011 | 7/23/2016 | 7/22/2033 | R$4,290.25 | 6/1/2025 | Ativa | Substituir 01 banco de bateria, 250.0 Vcc, 800Ah. Posição Operacional: 900A1/FTZ. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | MG 230 kV FORTALEZA MG1 CE | RB | FT MG 230 kV FORTALEZA MG1 CE | 061/2001 | IPCA | RMEL | REN 443/2011 | 10/10/2016 | 10/9/2033 | R$7,228.15 | 6/1/2025 | Ativa | Implantação de Banco de Baterias * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | MG 230 kV FORTALEZA MG1 CE | RB | FT MG 230 kV FORTALEZA MG1 CE | 061/2001 | IPCA | RMEL | REN 443/2011 | 8/1/2016 | 8/4/2046 | R$12,114.36 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | MG 230 kV FORTALEZA MG1 CE | RB | FT MG 230 kV FORTALEZA MG1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/11/2019 | 3/30/2037 | R$344,776.47 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TT 69/13,8 kV FORTALEZA TA2 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TT 69/13,8 kV FORTALEZA TA2 CE | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/21/2014 | 3/23/2044 | R$12,618.29 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TT 69/13,8 kV FORTALEZA TA1 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TT 69/13,8 kV FORTALEZA TA1 CE | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 1/3/2014 | 1/2/2047 | R$20,020.32 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 32A1-8. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TR 69/13,8 kV FORTALEZA TR1 CE | RB | FT MG 230 kV FORTALEZA MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TR 230/69 kV FORTALEZA TR5 CE | RBF | FT TR 230/69 kV FORTALEZA TR5 CE | 061/2001 | IPCA | RBNI | REA 6043/2016 | 3/3/2023 | 3/3/2046 | R$321,294.80 | 6/1/2025 | Ativa | T2016-062 | Ampliação, na SE FORTALEZA, de um módulo de conexão, em 69 kV, para o autotransformador TR 230/69 kV FORTALEZA 04T5 CE | ||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TR 230/69 kV FORTALEZA TR4 CE | RBF | FT TR 230/69 kV FORTALEZA TR4 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TR 230/69 kV FORTALEZA TR4 CE | RBF | FT TR 230/69 kV FORTALEZA TR4 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TR 230/69 kV FORTALEZA TR4 CE | RBF | FT TR 230/69 kV FORTALEZA TR4 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$162,185.50 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TR 230/69 kV FORTALEZA TR4 CE | RBF | FT TR 230/69 kV FORTALEZA TR4 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/19/2021 | 9/18/2045 | R$7,930.29 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TR 230/69 kV FORTALEZA TR3 CE | RBF | FT TR 230/69 kV FORTALEZA TR3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TR 230/69 kV FORTALEZA TR3 CE | RBF | FT TR 230/69 kV FORTALEZA TR3 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TR 230/69 kV FORTALEZA TR3 CE | RBF | FT TR 230/69 kV FORTALEZA TR3 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$162,185.50 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TR 230/69 kV FORTALEZA TR3 CE | RBF | FT TR 230/69 kV FORTALEZA TR3 CE | 061/2001 | IPCA | RBNI | REA 2040/2009 | 3/16/2014 | 7/23/2045 | R$27,702.13 | 6/1/2025 | Ativa | Substituição dos TCs de Proteção 92T3(A/B/C) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TR 230/69 kV FORTALEZA TR3 CE | RBF | FT TR 230/69 kV FORTALEZA TR3 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/7/2021 | 9/6/2045 | R$7,921.55 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TR 230/69 kV FORTALEZA TR2 CE | RBF | FT TR 230/69 kV FORTALEZA TR2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TR 230/69 kV FORTALEZA TR2 CE | RBF | FT TR 230/69 kV FORTALEZA TR2 CE | 061/2001 | IPCA | RBNI | REA 2040/2009 | 1/30/2013 | 2/2/2043 | R$7,322.74 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 32T2-4, reforço autorizado pela REA 2040/2009. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TR 230/69 kV FORTALEZA TR2 CE | RBF | FT TR 230/69 kV FORTALEZA TR2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TR 230/69 kV FORTALEZA TR2 CE | RBF | FT TR 230/69 kV FORTALEZA TR2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$162,185.50 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TR 230/69 kV FORTALEZA TR2 CE | RBF | FT TR 230/69 kV FORTALEZA TR2 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/1/2018 | 5/6/2047 | R$38,146.58 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TR 230/69 kV FORTALEZA TR1 CE | RBF | FT TR 230/69 kV FORTALEZA TR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TR 230/69 kV FORTALEZA TR1 CE | RBF | FT TR 230/69 kV FORTALEZA TR1 CE | 061/2001 | IPCA | RBNI | REA 2040/2009 | 1/30/2013 | 2/2/2043 | R$7,322.74 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 32T1-4, autorizado pela REA 2040/2009. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TR 230/69 kV FORTALEZA TR1 CE | RBF | FT TR 230/69 kV FORTALEZA TR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TR 230/69 kV FORTALEZA TR1 CE | RBF | FT TR 230/69 kV FORTALEZA TR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$162,185.50 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TR 230/69 kV FORTALEZA TR1 CE | RBF | FT TR 230/69 kV FORTALEZA TR1 CE | 061/2001 | IPCA | RMEL | REN 443/2011 | 12/16/2017 | 9/5/2047 | R$5,494.49 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE PARA-RAIO, POSIÇÃO 72T1 FASE A DA SUB FORTALEZA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TR 230/69 kV FORTALEZA TR1 CE | RBF | FT TR 230/69 kV FORTALEZA TR1 CE | 061/2001 | IPCA | RMEL | REN 443/2011 | 12/16/2017 | 9/5/2047 | R$5,494.49 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE PARA-RAIO, POSIÇÃO 72T1 FASE B DA SUB FORTALEZA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TR 230/69 kV FORTALEZA TR1 CE | RBF | FT TR 230/69 kV FORTALEZA TR1 CE | 061/2001 | IPCA | RMEL | REN 443/2011 | 12/16/2017 | 9/5/2047 | R$5,494.49 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE PARA-RAIO, POSIÇÃO 72T1 FASE C DA SUB FORTALEZA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV TR 230/69 kV FORTALEZA TR1 CE | RBF | FT TR 230/69 kV FORTALEZA TR1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/16/2017 | 12/19/2047 | R$30,358.34 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV BC 69 kV 21,3 Mvar FORTALEZA BC6 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV BC 69 kV 21,3 Mvar FORTALEZA BC6 CE | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 3/8/2013 | 3/11/2043 | R$7,349.94 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 32H4-4. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV BC 69 kV 21,3 Mvar FORTALEZA BC6 CE | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/14/2014 | 11/20/2045 | R$10,160.17 | 6/1/2025 | Ativa | Revitalização Necessária: SUBSTITUIÇÃO DO TC RITZ 92H4 FASE C. Incluído no recurso contra a REH 2.098/2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV BC 69 kV 21,3 Mvar FORTALEZA BC6 CE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV BC 69 kV 21,3 Mvar FORTALEZA BC6 CE | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/2/2016 | 12/5/2046 | R$9,793.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV BC 69 kV 21,3 Mvar FORTALEZA BC4 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV BC 69 kV 21,3 Mvar FORTALEZA BC4 CE | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 1/30/2013 | 2/2/2043 | R$7,322.74 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 32H2-4, reforço autorizado pela REA 2040/2009. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV BC 69 kV 21,3 Mvar FORTALEZA BC4 CE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV BC 69 kV 21,3 Mvar FORTALEZA BC4 CE | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 7/1/2016 | 7/4/2046 | R$7,633.99 | 6/1/2025 | Ativa | Substituído TC AOT 72,5 com vida regulatória esgotada. Posição Operacional: 92H2-C/FTZ. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV BC 69 kV 21,3 Mvar FORTALEZA BC4 CE | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 7/1/2016 | 7/4/2046 | R$7,633.99 | 6/1/2025 | Ativa | Substituído TC AOT 72,5 com vida regulatória esgotada. Posição Operacional: 92H2-A/FTZ. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV BC 69 kV 21,3 Mvar FORTALEZA BC4 CE | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 7/1/2016 | 7/4/2046 | R$7,633.99 | 6/1/2025 | Ativa | Substituído TC AOT 72,5 com vida regulatória esgotada. Posição Operacional: 92H2-B/FTZ. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 3/8/2013 | 3/11/2043 | R$7,349.94 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 32H3-4. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 6/30/2016 | 7/3/2046 | R$7,633.30 | 6/1/2025 | Ativa | Substituído TC AOT 72,5 com vida regulatória esgotada. Posição Operacional: 92H3-A/FTZ. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 6/30/2016 | 7/3/2046 | R$7,633.30 | 6/1/2025 | Ativa | Substituído TC AOT 72,5 com vida regulatória esgotada. Posição Operacional: 92H3-B/FTZ. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 6/30/2016 | 7/3/2046 | R$7,633.30 | 6/1/2025 | Ativa | Substituído TC AOT 72,5 com vida regulatória esgotada. Posição Operacional: 92H3-C/FTZ. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/3/2022 | 8/5/2052 | R$10,898.04 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC3 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC3 CE | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 1/30/2013 | 2/2/2043 | R$7,322.74 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 32H1-4, reforço autorizado pela REA 2040/2009. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC3 CE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC3 CE | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/8/2022 | 4/12/2047 | R$70,514.86 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | MC 26 kV TT 26/0 kV FORTALEZA TT2 CE | RB | FT CE 100/-70 MvAr FORTALEZA CE1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 26 kV TT 26/0 kV FORTALEZA TT1 CE | RB | FT CE 100/-70 MvAr FORTALEZA CE1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 26 kV TR 230/26 kV FORTALEZA TR1 CE CE2 | RB | FT CE 100/-70 MvAr FORTALEZA CE1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 26 kV TR 230/26 kV FORTALEZA TR1 CE CE1 | RB | FT CE 100/-70 MvAr FORTALEZA CE1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV TR 230/69 kV FORTALEZA TR5 CE | RBF | FT TR 230/69 kV FORTALEZA TR5 CE | 061/2001 | IPCA | RBNI | REA 6043/2016 | 3/3/2023 | 3/3/2046 | R$751,409.88 | 6/1/2025 | Ativa | T2016-062 | Ampliação, na SE FORTALEZA, de um módulo de conexão, em 230 kV, para o autotransformador TR 230/69 kV FORTALEZA 04T5 CE | ||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV TR 230/69 kV FORTALEZA TR4 CE | RBF | FT TR 230/69 kV FORTALEZA TR4 CE | 061/2001 | IPCA | RBNI | REA 2244/2010 | 9/5/2014 | 9/21/2047 | R$90,940.42 | 6/1/2025 | Ativa | T2009-235 | Substituir o disjuntor 14T4 por superação. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV TR 230/69 kV FORTALEZA TR4 CE | RBF | FT TR 230/69 kV FORTALEZA TR4 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV TR 230/69 kV FORTALEZA TR4 CE | RBF | FT TR 230/69 kV FORTALEZA TR4 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/15/2021 | 12/14/2050 | R$176,722.28 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV TR 230/69 kV FORTALEZA TR3 CE | RBF | FT TR 230/69 kV FORTALEZA TR3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV TR 230/69 kV FORTALEZA TR3 CE | RBF | FT TR 230/69 kV FORTALEZA TR3 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$410,719.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV TR 230/69 kV FORTALEZA TR3 CE | RBF | FT TR 230/69 kV FORTALEZA TR3 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/1/2020 | 5/28/2049 | R$146,697.04 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV TR 230/69 kV FORTALEZA TR2 CE | RBF | FT TR 230/69 kV FORTALEZA TR2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV TR 230/69 kV FORTALEZA TR2 CE | RBF | FT TR 230/69 kV FORTALEZA TR2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$410,719.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV TR 230/69 kV FORTALEZA TR2 CE | RBF | FT TR 230/69 kV FORTALEZA TR2 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/2/2021 | 10/7/2050 | R$185,271.86 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV TR 230/69 kV FORTALEZA TR1 CE | RBF | FT TR 230/69 kV FORTALEZA TR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV TR 230/69 kV FORTALEZA TR1 CE | RBF | FT TR 230/69 kV FORTALEZA TR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$410,719.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV TR 230/69 kV FORTALEZA TR1 CE | RBF | FT TR 230/69 kV FORTALEZA TR1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/22/2020 | 11/25/2050 | R$125,270.71 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV TR 230/26 kV FORTALEZA TR1 CE CE1/CE2 | RB | FT CE 100/-70 MvAr FORTALEZA CE1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$151,198.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV TR 230/26 kV FORTALEZA TR1 CE CE1/CE2 | RB | FT CE 100/-70 MvAr FORTALEZA CE1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/7/2021 | 10/10/2051 | R$65,505.99 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV RTL 230 kV 10 Mvar FORTALEZA RT4 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$91,861.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV RTL 230 kV 10 Mvar FORTALEZA RT4 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/5/2020 | 1/7/2050 | R$62,310.35 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV RTL 230 kV 10 Mvar FORTALEZA RT3 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$91,861.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV RTL 230 kV 10 Mvar FORTALEZA RT3 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE | 061/2001 | IPCA | RMEL | REN 443/2011 | 1/25/2016 | 1/27/2046 | R$14,221.74 | 6/1/2025 | Ativa | Substituído TC QDR 245P com alta taxa de falha. Posição Operacional: 94E3-C/FTZ. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV RTL 230 kV 10 Mvar FORTALEZA RT3 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE | 061/2001 | IPCA | RMEL | REN 443/2011 | 1/25/2016 | 1/27/2046 | R$14,221.74 | 6/1/2025 | Ativa | Substituído TC QDR 245 com alta taxa de falha. Posição Operacional: 94E3-A/FTZ. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV RTL 230 kV 10 Mvar FORTALEZA RT2 CE | RB | FT RTL 230 kV 10 Mvar FORTALEZA RT2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$91,861.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV RTL 230 kV 10 Mvar FORTALEZA RT2 CE | RB | FT RTL 230 kV 10 Mvar FORTALEZA RT2 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/4/2018 | 10/6/2048 | R$40,015.69 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV RTL 230 kV 10 Mvar FORTALEZA RT1 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$91,861.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV RTB 230 kV 10 Mvar FORTALEZA RT5 CE | RB | FT RTB 230 kV 10 Mvar FORTALEZA RT5 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$140,466.92 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV RTB 230 kV 10 Mvar FORTALEZA RT5 CE | RB | FT RTB 230 kV 10 Mvar FORTALEZA RT5 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/24/2021 | 5/17/2050 | R$110,958.73 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV BC 230 kV 50,5 Mvar FORTALEZA BC1 CE | RB | FT BC 230 kV 50,5 MVAr FORTALEZA BC1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$166,750.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV BC 230 kV 50,5 Mvar FORTALEZA BC1 CE | RB | FT BC 230 kV 50,5 MVAr FORTALEZA BC1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$467,928.80 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV BC 230 kV 50,5 Mvar FORTALEZA BC1 CE | RB | FT BC 230 kV 50,5 MVAr FORTALEZA BC1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$431,373.18 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 230 kV BC 230 kV 50,5 Mvar FORTALEZA BC1 CE | RB | FT BC 230 kV 50,5 MVAr FORTALEZA BC1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/14/2021 | 10/17/2051 | R$19,235.64 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | MC 13,8 kV TR 69/13,8 kV FORTALEZA TR1 CE | RB | FT MG 230 kV FORTALEZA MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$48,477.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 13,8 kV TR 230/69 kV FORTALEZA TR4 CE | RBF | FT TR 230/69 kV FORTALEZA TR4 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 13,8 kV TR 230/69 kV FORTALEZA TR3 CE | RBF | FT TR 230/69 kV FORTALEZA TR3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 13,8 kV RTB 13,8 kV 5 Mvar FORTALEZA RT2 CE | RBF | FT RTB 13,8 kV 5 Mvar FORTALEZA RT2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,598.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 13,8 kV RTB 13,8 kV 10 Mvar FORTALEZA RT1 CE | RBF | FT RTB 13,8 kV 10 Mvar FORTALEZA RT1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,598.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 13,8 kV BC 13,8 kV 3,1 Mvar FORTALEZA BC9 CE | RBF | FT BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 13,8 kV BC 13,8 kV 3,1 Mvar FORTALEZA BC8 CE | RBF | FT BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 13,8 kV BC 13,8 kV 3,1 Mvar FORTALEZA BC7 CE | RBF | FT BC 13,8 kV 3,1 MVAr FORTALEZA BC7 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 13,8 kV BC 13,8 kV 3,1 Mvar FORTALEZA BC12 CE | RBF | FT BC 13,8 kV 3,1 MVAr FORTALEZA BC12 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 13,8 kV BC 13,8 kV 3,1 Mvar FORTALEZA BC11 CE | RBF | FT BC 13,8 kV 3,1 MVAr FORTALEZA BC11 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | MC 13,8 kV BC 13,8 kV 3,1 Mvar FORTALEZA BC10 CE | RBF | FT BC 13,8 kV 3,1 MVAr FORTALEZA BC10 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | IB 69 kV MG 230 kV FORTALEZA MG1 CE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | IB 69 kV MG 230 kV FORTALEZA MG1 CE IB1 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 1/30/2013 | 2/2/2043 | R$14,645.48 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 32D1-1/2, autorizada pela REA 2040/2009. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | IB 69 kV MG 230 kV FORTALEZA MG1 CE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$118,244.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | IB 69 kV MG 230 kV FORTALEZA MG1 CE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$109,007.13 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | IB 230 kV MG 230 kV FORTALEZA MG1 CE IB3 | RB | FT MG 230 kV FORTALEZA MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,837.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | IB 230 kV MG 230 kV FORTALEZA MG1 CE IB2 | RB | FT MG 230 kV FORTALEZA MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,837.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | IB 230 kV MG 230 kV FORTALEZA MG1 CE IB1 | RB | FT MG 230 kV FORTALEZA MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,837.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | IB 230 kV MG 230 kV FORTALEZA MG1 CE IB1 | RB | FT MG 230 kV FORTALEZA MG1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$325,059.40 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | IB 230 kV MG 230 kV FORTALEZA MG1 CE IB1 | RB | FT MG 230 kV FORTALEZA MG1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$299,665.05 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | IB 230 kV MG 230 kV FORTALEZA MG1 CE IB1 | RB | FT MG 230 kV FORTALEZA MG1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/7/2022 | 2/10/2052 | R$42,753.24 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | IB 13,8 kV MG 230 kV FORTALEZA MG1 CE IB2 | RBF | FT BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,840.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | IB 13,8 kV MG 230 kV FORTALEZA MG1 CE IB2 | RBF | FT BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$78,124.73 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | IB 13,8 kV MG 230 kV FORTALEZA MG1 CE IB1 | RBF | FT BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,840.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | IB 13,8 kV MG 230 kV FORTALEZA MG1 CE IB1 | RBF | FT BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$78,124.73 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA TBM 02J5 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA TBM 02J5 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 5/24/2013 | 3/15/2046 | R$62,207.01 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 32J5-4/5/6. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA TBM 02J5 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 5/24/2013 | 9/30/2044 | R$17,964.68 | 6/1/2025 | Ativa | Substituição dos TCs de Proteção 92J5-1(B/C). Incluída no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA TBM 02J5 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA TBM 02J5 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA TBM 02J5 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 11/29/2015 | 11/28/2039 | R$6,009.71 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE PARARAIOS, POSIÇÃO 72J5 FASES A,B E C DA SUB FORTALEZA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA PARANGABA 02J8 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA PARANGABA 02J8 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 8/26/2013 | 8/25/2046 | R$19,791.61 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 32J8-6. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA PARANGABA 02J8 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA PARANGABA 02J8 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/31/2018 | 7/5/2047 | R$38,346.21 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA PARANGABA 02J7 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA PARANGABA 02J7 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 1/30/2013 | 2/2/2043 | R$14,645.48 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 32J7-4/6, reforço autorizado pela REA 2040/2009. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA PARANGABA 02J7 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 4/30/2014 | 9/6/2045 | R$18,544.57 | 6/1/2025 | Ativa | Substituição dos TCs de Proteção 92J7-1(B/C). RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA PARANGABA 02J7 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA PARANGABA 02J7 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA PARANGABA 02J7 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/12/2022 | 6/1/2050 | R$34,305.34 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA MONDUBIM 02J6 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA MONDUBIM 02J6 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 9/6/2013 | 1/13/2045 | R$18,143.15 | 6/1/2025 | Ativa | Substituição dos TCs de Proteção 92J6-1(A/B). RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA MONDUBIM 02J6 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA MONDUBIM 02J6 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA MONDUBIM 02J6 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 11/29/2015 | 11/28/2039 | R$6,009.71 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE PARARAIOS, POSIÇÃO 72J6 FASES A,B E C DA SUB FORTALEZA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA MONDUBIM 02J6 | DIT | 061/2001 | IPCA | RCDM | REA 5484/2015 | 8/3/2018 | 8/2/2051 | R$61,817.94 | 6/1/2025 | Ativa | Subtituição do Disjuntor do vão EL MONDUBIM (12J6). Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA MONDUBIM 02J6 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 9/30/2013 | 10/3/2043 | R$8,793.63 | 6/1/2025 | Ativa | Subtituição de 3 Transformadores de Corrente do vão EL MONDUBIM (92J6). Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA MONDUBIM 02J6 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 7/29/2018 | 7/28/2058 | R$9,096.07 | 6/1/2025 | Ativa | Substituição de cabos e bays de conexão do(s) vão(s): - EL MONDUBIM (02J6). Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA MESSEJANA 02J2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA MESSEJANA 02J2 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 3/15/2014 | 9/2/2046 | R$82,326.70 | 6/1/2025 | Ativa | Substituição dos TCs de Proteção 92J2-2(A/C) / Substituição de Chaves seccionadoras 32J2-4/5/6. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA MESSEJANA 02J2 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA MESSEJANA 02J2 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 11/29/2015 | 11/28/2039 | R$6,009.71 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE PARARAIOS, POSIÇÃO 72J2 FASES A,B E C DA SUB FORTALEZA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA JABOTI 02N1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA JABOTI 02N1 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 1/17/2014 | 1/16/2047 | R$20,044.92 | 6/1/2025 | Ativa | Substituição de Chave seccionadora 32N1-6. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA JABOTI 02N1 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 1/27/2014 | 10/20/2046 | R$43,534.58 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 32N1-4/5. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA JABOTI 02N1 | DIT | 061/2001 | IPCA | RCDM | REA 6043/2016 | 3/3/2023 | 3/3/2046 | R$100,694.41 | 6/1/2025 | Ativa | T2016-062 | Relocação da entrada de linha para Jaboti C2 (02N1) | |||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA JABOTI 02N1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA JABOTI 02N1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/10/2022 | 4/9/2046 | R$8,078.41 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA JABOTI 02J1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA JABOTI 02J1 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 9/22/2013 | 1/29/2045 | R$18,170.35 | 6/1/2025 | Ativa | Substituição dos TCs de Proteção 92J1-2(A/C). RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA JABOTI 02J1 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 9/23/2013 | 7/15/2046 | R$62,890.36 | 6/1/2025 | Ativa | Substituição de Chave seccionadora 32J1-4/5/6. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA JABOTI 02J1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA JABOTI 02J1 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 11/29/2015 | 11/28/2039 | R$4,006.47 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE PARARAIOS, POSIÇÃO 72J1 FASES B E C DA SUB FORTALEZA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA DISTRITO 02J9 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA DISTRITO 02J9 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 12/6/2013 | 6/11/2046 | R$23,363.18 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 32J9-5. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA DISTRITO 02J9 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA DISTRITO 02J9 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA DISTRITO 02J9 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/9/2018 | 8/13/2047 | R$38,472.95 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA DISTR. II 02L4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA DISTR. II 02L4 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 11/24/2013 | 4/2/2045 | R$27,416.15 | 6/1/2025 | Ativa | Substituição dos TCs de Proteção 92L4-1(A/B/C). RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA DISTR. II 02L4 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA DISTR. II 02L4 | DIT | 061/2001 | IPCA | RCDM | REA 758/2006 | 9/29/2013 | 10/2/2043 | R$30,389.68 | 6/1/2025 | Ativa | Substituição de 2 seccionadoras. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA DISTR. II 02L3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA DISTR. II 02L3 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 1/30/2013 | 2/2/2043 | R$14,645.48 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 32L3-4/6, reforço autorizado pela REA 2040/2009. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA DISTR. II 02L3 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 3/8/2013 | 9/11/2045 | R$22,793.33 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 32L3-5. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA DISTR. II 02L3 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 11/28/2013 | 4/6/2045 | R$27,426.35 | 6/1/2025 | Ativa | Substituição dos TCs de Proteção 92L3-1(A/B/C). RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA DISTR. II 02L3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA DISTR. II 02L3 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/18/2022 | 12/17/2046 | R$8,262.50 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA D. GOUVEIA 02J4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA D. GOUVEIA 02J4 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 6/1/2013 | 3/23/2046 | R$62,251.81 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 32J4-4/5/6. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA D. GOUVEIA 02J4 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA D. GOUVEIA 02J4 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 11/29/2015 | 11/28/2039 | R$6,009.71 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE PARARAIOS, POSIÇÃO 72J4 FASES A,B E C DA SUB FORTALEZA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA D. GOUVEIA 02J4 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/17/2015 | 8/19/2045 | R$28,153.47 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA D. GOUVEIA 02J3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA D. GOUVEIA 02J3 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 4/30/2013 | 4/29/2046 | R$39,168.60 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 32J3-4/6. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA D. GOUVEIA 02J3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA D. GOUVEIA 02J3 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 11/29/2015 | 11/28/2039 | R$6,009.71 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE PARARAIOS, POSIÇÃO 72J3 FASES A,B E C DA SUB FORTALEZA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA D. GOUVEIA 02J3 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/24/2022 | 5/26/2052 | R$34,552.92 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA COLUNA 02L2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA COLUNA 02L2 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 11/17/2013 | 3/26/2045 | R$27,398.30 | 6/1/2025 | Ativa | Substituição dos TCs de Proteção 92L2-1(A/B/C). Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA COLUNA 02L2 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 12/19/2013 | 10/10/2046 | R$63,377.66 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 32L2-4/5/6. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA COLUNA 02L2 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA COLUNA 02L2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/19/2022 | 12/18/2046 | R$8,262.98 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA COLUNA 02L1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA COLUNA 02L1 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 1/3/2014 | 1/2/2047 | R$40,040.64 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 32L1-4/6. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA COLUNA 02L1 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 11/2/2013 | 3/11/2045 | R$9,120.03 | 6/1/2025 | Ativa | Substituição dos TCs de Proteção 92L1-1(B). RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA COLUNA 02L1 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 11/2/2013 | 3/11/2045 | R$18,240.04 | 6/1/2025 | Ativa | Substituição dos TCs de Proteção 92L1-1(A/C). RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA COLUNA 02L1 | DIT | 061/2001 | IPCA | RCDM | REA 6043/2016 | 3/3/2023 | 3/3/2046 | R$100,694.41 | 6/1/2025 | Ativa | T2016-062 | Relocação da entrada de linha para Coluna C1 (02L1) | |||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA COLUNA 02L1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 69 kV FORTALEZA COLUNA 02L1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/10/2022 | 4/9/2046 | R$8,078.41 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-3 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-3 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE | 061/2001 | IPCA | RBNI | REA 2040/2009 | 4/24/2014 | 4/26/2044 | R$115,800.65 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras associados ao Disjuntor 14Z4, 14Z5 e 14Z6. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 – 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-3 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/24/2020 | 7/10/2049 | R$126,256.34 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-2 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-2 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBNI | REA 2040/2009 | 4/24/2014 | 4/26/2044 | R$115,800.65 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras associados ao Disjuntor 14Z4, 14Z5 e 14Z6. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 – 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-2 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBNI | REA 2837/2011 | 5/6/2021 | 8/29/2055 | R$256,800.50 | 6/1/2025 | Ativa | Substituição do disjuntor 14Z5 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-2 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/19/2020 | 2/10/2049 | R$106,911.76 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-2 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBNI | REA 7761/2019 | 12/18/2015 | 12/17/2043 | R$19,422.46 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE SISTEMAS DE PROTEÇÃO NO TERMINAL DE LINHA LT 04Z4 na SE FTZ Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-1 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-1 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBNI | REA 2040/2009 | 4/24/2014 | 4/26/2044 | R$115,800.65 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras associados ao Disjuntor 14Z4, 14Z5 e 14Z6.* Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 – 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-1 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/7/2019 | 2/9/2049 | R$114,068.68 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-1 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBNI | REA 7761/2019 | 12/18/2015 | 12/17/2030 | R$19,280.05 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE SISTEMAS DE PROTEÇÃO NO TERMINAL DE LINHA LT 04Z4 na SE FTZ Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE | 061/2001 | IPCA | RBNI | REA 2823/2011 | 7/29/2019 | 4/20/2041 | R$183,652.94 | 6/1/2025 | Ativa | T2010-048 | Adequar a proteção, na SE Fortaleza I, de um módulo de entrada de linha 230 kV, arranjo barra principal e transferência, para o primeiro circuito da LT 230kV Banabuiú - Fortaleza I. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | FORTALEZA | EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE | 061/2001 | IPCA | RBNI | REA 2823/2011 | 10/2/2020 | 11/20/2050 | R$85,942.90 | 6/1/2025 | Ativa | T2010-086 | Adequar, na SE Fortaleza I, um módulo de entrada de linha, arranjo barra dupla a quatro chaves, para a LT 230 kV Aquiraz II - Fortaleza I. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | FORTALEZA | EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE | 061/2001 | IPCA | RBNI | REA 3631/2012 | 8/27/2021 | 10/30/2052 | R$412,138.12 | 6/1/2025 | Ativa | T2012-075 | Adequação, na SE Fortaleza I, de um módulo de entrada de linha 230 kV, arranjo barra principal e transferência, destinado a conexão com a LT 230 kV Fortaleza I - Aquiraz II. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | FORTALEZA | EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/2/2021 | 10/16/2049 | R$127,050.55 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE | 061/2001 | IPCA | RBNI | REA 2244/2010 | 9/5/2014 | 9/4/2034 | R$ 424.95 | 6/1/2025 | Ativa | T2009-235 | Substituir a bobina de bloqueio n. 64F2 por superação. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | FORTALEZA | EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE | 061/2001 | IPCA | RBNI | REA 2823/2011 | 10/2/2020 | 4/29/2040 | R$142,508.20 | 6/1/2025 | Ativa | T2010-048 | Adequar a proteção, na SE Fortaleza I, de um módulo de entrada de linha 230 kV, arranjo barra principal e transferência, para o segundo circuito da LT 230kV Banabuiú - Fortaleza I. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | FORTALEZA | EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$596,907.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/23/2022 | 5/22/2046 | R$26,086.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 8/31/2015 | 9/8/2046 | R$18,198.79 | 6/1/2025 | Ativa | Revitalização Necessária: SUBSTITUIÇÃO DO TC 94F3 FASE C. Incluído no recurso contra a REH 2.098/2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$596,907.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/12/2019 | 12/13/2048 | R$256,309.79 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | CE 100/-70 Mvar FORTALEZA CE2 CE | RB | FT CE 100/-70 MvAr FORTALEZA CE1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,253,231.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | CE 100/-70 Mvar FORTALEZA CE2 CE | RB | FT CE 100/-70 MvAr FORTALEZA CE1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,322,949.01 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | CE 100/-70 Mvar FORTALEZA CE1 CE | RB | FT CE 100/-70 MvAr FORTALEZA CE1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,253,231.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | BC 69 kV 21,3 Mvar FORTALEZA BC6 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$107,937.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | BC 69 kV 21,3 Mvar FORTALEZA BC6 CE | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/19/2014 | 7/12/2040 | R$183,607.06 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS CAPACITORES DE ASCAREL FABRICADO POR INDUCON MODELO FPA1 69KV 02H4 Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | BC 69 kV 21,3 Mvar FORTALEZA BC4 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$107,937.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | BC 69 kV 21,3 Mvar FORTALEZA BC4 CE | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/19/2014 | 7/12/2040 | R$183,607.06 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS CAPACITORES DE ASCAREL FABRICADO POR INDUCON MODELO FPA1 69KV 02H2 Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | BC 69 kV 20,3 Mvar FORTALEZA BC5 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$107,937.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | BC 69 kV 20,3 Mvar FORTALEZA BC5 CE | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/26/2014 | 7/19/2040 | R$183,749.81 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS CAPACITORES DE ASCAREL FABRICADO POR INDUCON MODELO FPA1 69KV 02H3 Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | BC 69 kV 20,3 Mvar FORTALEZA BC3 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$107,937.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FORTALEZA | BC 69 kV 20,3 Mvar FORTALEZA BC3 CE | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/19/2014 | 7/12/2040 | R$183,607.06 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS CAPACITORES DE ASCAREL FABRICADO POR INDUCON MODELO FPA1 69KV 02H1 Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FORTALEZA | BC 230 kV 50,5 Mvar FORTALEZA BC1 CE | RB | FT BC 230 kV 50,5 MVAr FORTALEZA BC1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$191,630.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | BC 230 kV 50,5 Mvar FORTALEZA BC1 CE | RB | FT BC 230 kV 50,5 MVAr FORTALEZA BC1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$537,748.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | BC 13,8 kV 3,1 Mvar FORTALEZA BC9 CE | RBF | FT BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$29,742.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | BC 13,8 kV 3,1 Mvar FORTALEZA BC9 CE | RBF | FT BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/12/2014 | 9/11/2029 | R$5,786.39 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS CAPACITORES DE ASCAREL FABRICADO POR INDUCON MODELO FPA1 15KV 01H3 Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | BC 13,8 kV 3,1 Mvar FORTALEZA BC8 CE | RBF | FT BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$29,742.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | BC 13,8 kV 3,1 Mvar FORTALEZA BC8 CE | RBF | FT BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/5/2014 | 9/4/2029 | R$5,778.28 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS CAPACITORES DE ASCAREL FABRICADO POR INDUCON MODELO FPA1 15KV 01H2 Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | BC 13,8 kV 3,1 Mvar FORTALEZA BC7 CE | RBF | FT BC 13,8 kV 3,1 MVAr FORTALEZA BC7 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$29,742.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | BC 13,8 kV 3,1 Mvar FORTALEZA BC7 CE | RBF | FT BC 13,8 kV 3,1 MVAr FORTALEZA BC7 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/5/2014 | 9/4/2029 | R$5,778.28 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS CAPACITORES DE ASCAREL FABRICADO POR INDUCON MODELO FPA1 15KV 01H1 Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | BC 13,8 kV 3,1 Mvar FORTALEZA BC12 CE | RBF | FT BC 13,8 kV 3,1 MVAr FORTALEZA BC12 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$29,742.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | BC 13,8 kV 3,1 Mvar FORTALEZA BC12 CE | RBF | FT BC 13,8 kV 3,1 MVAr FORTALEZA BC12 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/19/2014 | 9/18/2029 | R$5,794.49 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS CAPACITORES DE ASCAREL FABRICADO POR INDUCON MODELO FPA1 15KV 01H6 Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | BC 13,8 kV 3,1 Mvar FORTALEZA BC11 CE | RBF | FT BC 13,8 kV 3,1 MVAr FORTALEZA BC11 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$29,742.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | BC 13,8 kV 3,1 Mvar FORTALEZA BC11 CE | RBF | FT BC 13,8 kV 3,1 MVAr FORTALEZA BC11 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/12/2014 | 9/11/2029 | R$5,786.39 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS CAPACITORES DE ASCAREL FABRICADO POR INDUCON MODELO FPA1 15KV 01H5 Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA | BC 13,8 kV 3,1 Mvar FORTALEZA BC10 CE | RBF | FT BC 13,8 kV 3,1 MVAr FORTALEZA BC10 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$29,742.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA | BC 13,8 kV 3,1 Mvar FORTALEZA BC10 CE | RBF | FT BC 13,8 kV 3,1 MVAr FORTALEZA BC10 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/12/2014 | 9/11/2029 | R$5,786.39 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS CAPACITORES DE ASCAREL FABRICADO POR INDUCON MODELO FPA1 15KV 01H4 Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | TR 500/230 kV FORTALEZA II TRR1 CE | RB | FT TR 500/230 kV FORTALEZA II TRR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$622,465.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | TR 500/230 kV FORTALEZA II TRR1 CE | RB | FT TR 500/230 kV FORTALEZA II TRR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,746,742.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | TR 500/230 kV FORTALEZA II TRR1 CE | RB | FT TR 500/230 kV FORTALEZA II TRR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,610,282.76 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | TR 500/230 kV FORTALEZA II TR4 CE | RB | FT TR 500/230 kV FORTALEZA II TR4 CE | 061/2001 | IPCA | RBNI | REA 5211/2015 | 5/7/2017 | 7/29/2052 | R$ 5,075,626.61 | 6/1/2025 | Ativa | T2015-016 | Instalação, na Fortaleza II, do quarto banco de autotransformadores 500/230 kV, de 3 x 200 MVA. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | FORTALEZA II | TR 500/230 kV FORTALEZA II TR3 CE | RB | FT TR 500/230 kV FORTALEZA II TR3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,867,395.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | TR 500/230 kV FORTALEZA II TR2 CE | RB | FT TR 500/230 kV FORTALEZA II TR2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,867,395.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | TR 500/230 kV FORTALEZA II TR2 CE | RB | FT TR 500/230 kV FORTALEZA II TR2 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/13/2013 | 9/20/2048 | R$67,568.40 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BUCHAS HSP 500 KV e 230 KV, TIPO OTF, DOS AUTOTRAFOS 05T2 A/B/C E R. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | TR 500/230 kV FORTALEZA II TR2 CE | RB | FT TR 500/230 kV FORTALEZA II TR2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 5,240,226.18 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | TR 500/230 kV FORTALEZA II TR2 CE | RB | FT TR 500/230 kV FORTALEZA II TR2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 4,830,848.29 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | TR 500/230 kV FORTALEZA II TR1 CE | RB | FT TR 500/230 kV FORTALEZA II TR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,867,395.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | TR 500/230 kV FORTALEZA II TR1 CE | RB | FT TR 500/230 kV FORTALEZA II TR1 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/20/2013 | 9/27/2048 | R$50,705.77 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BUCHAS HSP 500 KV e 230 kV, TIPO OTF, DOS AUTOTRAFOS 05T1 A/B/C. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | TR 500/230 kV FORTALEZA II TR1 CE | RB | FT TR 500/230 kV FORTALEZA II TR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 5,240,226.18 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | TR 500/230 kV FORTALEZA II TR1 CE | RB | FT TR 500/230 kV FORTALEZA II TR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 4,830,848.29 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | RTL 500 kV 180 Mvar FORTALEZA II RT1 CE | RB | FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$770,628.97 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | RTL 500 kV 180 Mvar FORTALEZA II RT1 CE | RB | FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/18/2013 | 9/27/2049 | R$11,576.56 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BUCHAS HSP 500 KV TIPO OTF DOS REATORES 05E1 A/B/C E R. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| Nova Era Ceará | FORTALEZA II | RTL 500 kV 180 Mvar FORTALEZA II RT1 CE | RB | FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 2,102,915.21 | 6/1/2025 | Prevista | T2024-195-I | - Seccionamento da LT 500 kV Quixadá – Fortaleza II – C1 na subestação Pacatuba.- Remanejamento de Banco de Reator de Linha de 150 Mvar (da LT 500 kV Quixadá – Fortaleza II C1) da SE Fortaleza II, composto por unidades monofásicas 3 x 50 Mvar, para a barra da SE Pacatuba e instalação do respectivo Módulo de Conexão de Reator de Barra de 500kV na SE Pacatuba. | ||||
| AXIA Energia Nordeste | FORTALEZA II | RTB 500 kV 60 Mvar FORTALEZA II RTR1 CE | RB | FT RTB 500 kV 60 MVAr FORTALEZA II RTR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,898.24 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | RTB 500 kV 60 Mvar FORTALEZA II RTR1 CE | RB | FT RTB 500 kV 60 MVAr FORTALEZA II RTR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$765,798.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | RTB 500 kV 60 Mvar FORTALEZA II RTR1 CE | RB | FT RTB 500 kV 60 MVAr FORTALEZA II RTR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$705,972.72 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | RTB 500 kV 180 Mvar FORTALEZA II RT4 CE | RB | FT RTB 500 kV 180 Mvar FORTALEZA II RT4 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$773,925.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | RTB 500 kV 180 Mvar FORTALEZA II RT2 CE | RB | FT RTB 500 kV 180 Mvar FORTALEZA II RT2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$770,628.97 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | RTB 500 kV 180 Mvar FORTALEZA II RT2 CE | RB | FT RTB 500 kV 180 Mvar FORTALEZA II RT2 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/17/2013 | 9/26/2049 | R$28,235.47 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BUCHAS HSP 500 KV TIPO OTF DOS REATORES 05E2 A/B/C. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | RTB 500 kV 180 Mvar FORTALEZA II RT2 CE | RB | FT RTB 500 kV 180 Mvar FORTALEZA II RT2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,162,515.10 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | RTB 500 kV 180 Mvar FORTALEZA II RT2 CE | RB | FT RTB 500 kV 180 Mvar FORTALEZA II RT2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,993,574.71 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | MG 500 kV FORTALEZA II MG1 CE | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,703,510.25 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | MG 500 kV FORTALEZA II MG1 CE | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RBNI | REA 5211/2015 | 5/7/2017 | 10/30/2047 | R$191,391.53 | 6/1/2025 | Ativa | T2015-016 | Complementação do módulo geral da Subestação Fortaleza II com um módulo de infraestrutura de manobra em 230 kV. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | FORTALEZA II | MG 500 kV FORTALEZA II MG1 CE | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,780,337.60 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | MG 500 kV FORTALEZA II MG1 CE | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 4,406,887.21 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | MG 500 kV FORTALEZA II MG1 CE | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RMEL | REN 443/2011 | 10/11/2016 | 10/10/2033 | R$22,984.64 | 6/1/2025 | Ativa | Implantação de Banco de Baterias * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | MG 500 kV FORTALEZA II MG1 CE | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RBNI | REA 6137/2016 | 10/1/2021 | 8/24/2050 | R$674,679.23 | 6/1/2025 | Ativa | T2016-089 | Complementação do Módulo geral da SE Fortaleza II com 3 módulos de infraestrutura de manobra. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | FORTALEZA II | MG 500 kV FORTALEZA II MG1 CE | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/10/2020 | 1/25/2038 | R$302,619.53 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | MG 500 kV FORTALEZA II MG1 CE | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RBNI | DSP 2023/2022 | 7/28/2022 | 7/30/2052 | R$19,656.13 | 6/1/2025 | Ativa | Instalação de um transformador de potencial (medição e proteção) 230 kV, base e estrutura de suporte, posição operacional 84B2, Fase B, na barra 04B2 na SE FORTALEZA II. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | MG 500 kV FORTALEZA II MG1 CE | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RBNI | DSP 2023/2022 | 7/28/2022 | 7/30/2052 | R$19,656.13 | 6/1/2025 | Ativa | Instalação de um transformador de potencial (medição e proteção) 230 kV, base e estrutura de suporte, posição operacional 84B1, Fase B, na barra 04B1 na SE FORTALEZA II. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | MC 500 kV TR 500/230 kV FORTALEZA II TR4 CE | RB | FT TR 500/230 kV FORTALEZA II TR4 CE | 061/2001 | IPCA | RBNI | REA 5211/2015 | 5/7/2017 | 11/4/2049 | R$ 1,778,674.30 | 6/1/2025 | Ativa | T2015-016 | Instalação, na Subestação Fortaleza II, de um módulo de conexão, em 500 kV, para o quarto banco de autotransformadores 500/230, de 3 x 200 MVA. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | FORTALEZA II | MC 500 kV TR 500/230 kV FORTALEZA II TR3 CE | RB | FT TR 500/230 kV FORTALEZA II TR3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$414,502.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | MC 500 kV TR 500/230 kV FORTALEZA II TR2 CE | RB | FT TR 500/230 kV FORTALEZA II TR2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$414,502.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | MC 500 kV TR 500/230 kV FORTALEZA II TR2 CE | RB | FT TR 500/230 kV FORTALEZA II TR2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,163,163.61 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | MC 500 kV TR 500/230 kV FORTALEZA II TR2 CE | RB | FT TR 500/230 kV FORTALEZA II TR2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,072,294.74 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | MC 500 kV TR 500/230 kV FORTALEZA II TR2 CE | RB | FT TR 500/230 kV FORTALEZA II TR2 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/13/2021 | 7/16/2051 | R$150,680.97 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | MC 500 kV TR 500/230 kV FORTALEZA II TR1 CE | RB | FT TR 500/230 kV FORTALEZA II TR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$414,502.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | MC 500 kV TR 500/230 kV FORTALEZA II TR1 CE | RB | FT TR 500/230 kV FORTALEZA II TR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,163,163.61 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | MC 500 kV TR 500/230 kV FORTALEZA II TR1 CE | RB | FT TR 500/230 kV FORTALEZA II TR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,072,294.74 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | MC 500 kV TR 500/230 kV FORTALEZA II TR1 CE | RB | FT TR 500/230 kV FORTALEZA II TR1 CE | 061/2001 | IPCA | RMEL | REN 443/2011 | 3/20/2016 | 3/23/2046 | R$48,262.43 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC 500KV, TIPO AKOF, DE FABRICAÇAO SIEMENS * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018. RAP alterada no recurso apresentado face a REH2.258/2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | MC 500 kV TR 500/230 kV FORTALEZA II TR1 CE | RB | FT TR 500/230 kV FORTALEZA II TR1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/4/2021 | 1/7/2051 | R$74,239.52 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | MC 500 kV RTL 500 kV 180 Mvar FORTALEZA II RT1 CE | RB | FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$251,123.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | MC 500 kV RTB 500 kV 180 Mvar FORTALEZA II RT4 CE | RB | FT RTB 500 kV 180 Mvar FORTALEZA II RT4 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$388,096.61 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | MC 500 kV RTB 500 kV 180 Mvar FORTALEZA II RT4 CE | RB | FT RTB 500 kV 180 Mvar FORTALEZA II RT4 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/1/2019 | 10/3/2049 | R$57,491.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | MC 500 kV RTB 500 kV 180 Mvar FORTALEZA II RT2 CE | RB | FT RTB 500 kV 180 Mvar FORTALEZA II RT2 CE | 061/2001 | IPCA | RBNI | REA 5484/2015 | 11/3/2022 | 6/7/2054 | R$460,384.15 | 6/1/2025 | Ativa | Implantação de um módulo de conexão em 500 kV, arranjo DJM, para o Banco de Reatores de Barra 05E2 na SE Fortaleza II. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | MC 500 kV RTB 500 kV 150 Mvar FORTALEZA II RT3 CE | RB | FT RTB 500 kV 150 Mvar FORTALEZA II RT3 CE | 061/2001 | IPCA | RBNI | REA 5484/2015 | 11/3/2022 | 6/7/2054 | R$460,384.15 | 6/1/2025 | Ativa | Implantação de um módulo de conexão em 500 kV, arranjo DJM, para o Banco de Reatores de Barra 05E3 na SE Fortaleza II. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | MC 230 kV TR 500/230 kV FORTALEZA II TR4 CE | RB | FT TR 500/230 kV FORTALEZA II TR4 CE | 061/2001 | IPCA | RBNI | REA 5211/2015 | 5/7/2017 | 8/5/2049 | R$ 1,001,795.61 | 6/1/2025 | Ativa | T2015-016 | Instalação, na Subestação Fortaleza II, de um módulo de conexão, em 230 kV, para o quarto banco de autotransformadores 500/230, de 3 x 200 MVA. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | FORTALEZA II | MC 230 kV TR 500/230 kV FORTALEZA II TR4 CE | RB | FT TR 500/230 kV FORTALEZA II TR4 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/12/2021 | 12/15/2051 | R$21,949.41 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | MC 230 kV TR 500/230 kV FORTALEZA II TR3 CE | RB | FT TR 500/230 kV FORTALEZA II TR3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,694.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | MC 230 kV TR 500/230 kV FORTALEZA II TR2 CE | RB | FT TR 500/230 kV FORTALEZA II TR2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,694.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | MC 230 kV TR 500/230 kV FORTALEZA II TR2 CE | RB | FT TR 500/230 kV FORTALEZA II TR2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$431,291.40 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | MC 230 kV TR 500/230 kV FORTALEZA II TR2 CE | RB | FT TR 500/230 kV FORTALEZA II TR2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$397,597.97 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | MC 230 kV TR 500/230 kV FORTALEZA II TR2 CE | RB | FT TR 500/230 kV FORTALEZA II TR2 CE | 061/2001 | IPCA | RBNI | REA 6137/2016 | 2/3/2021 | 4/7/2051 | R$70,703.68 | 6/1/2025 | Ativa | T2016-089 | Adequação do módulo de conexão 230 kV do transformador 500/230 kV TR2 com a substituição de três transformadores de corrente e implantação de proteção de barra adaptativa conjugada com falha de disjuntor. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | FORTALEZA II | MC 230 kV TR 500/230 kV FORTALEZA II TR1 CE | RB | FT TR 500/230 kV FORTALEZA II TR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,694.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | MC 230 kV TR 500/230 kV FORTALEZA II TR1 CE | RB | FT TR 500/230 kV FORTALEZA II TR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$431,291.40 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | MC 230 kV TR 500/230 kV FORTALEZA II TR1 CE | RB | FT TR 500/230 kV FORTALEZA II TR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$397,597.97 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | MC 230 kV TR 500/230 kV FORTALEZA II TR1 CE | RB | FT TR 500/230 kV FORTALEZA II TR1 CE | 061/2001 | IPCA | RBNI | REA 6137/2016 | 2/3/2021 | 5/3/2051 | R$49,273.18 | 6/1/2025 | Ativa | T2016-089 | Adequação do módulo de conexão 230 kV do transformador 500/230 kV TR1 com a substituição de três transformadores de corrente e implantação de proteção de barra adaptativa conjugada com falha de disjuntor. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | FORTALEZA II | IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB5 | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$439,875.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB5 | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RBNI | REA 5484/2015 | 11/3/2022 | 6/7/2054 | R$460,384.15 | 6/1/2025 | Ativa | Implantação de um módulo de manobra interligação de barras (IB), 500 kV, arranjo DJM, na SE Fortaleza II. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB4 | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$439,875.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB4 | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/30/2019 | 10/2/2049 | R$94,487.05 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB2 | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$439,875.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB2 | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,234,365.24 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB2 | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,137,933.94 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB1 | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$439,875.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB1 | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,234,365.24 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB1 | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,137,933.94 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB1 | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RMEL | REN 443/2011 | 3/20/2016 | 3/23/2046 | R$96,524.85 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC 500KV, TIPO AKOF, DE FABRICAÇAO SIEMENS * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018. RAP alterada no recurso apresentado face a REH2.258/2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | IB 230 kV MG 500 kV FORTALEZA II MG1 CE IB2 | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RBNI | REA 6137/2016 | 10/1/2021 | 5/27/2053 | R$ 1,238,630.78 | 6/1/2025 | Ativa | T2016-089 | INSTALAÇÃO do módulo de interligação de barras IB2. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | FORTALEZA II | IB 230 kV MG 500 kV FORTALEZA II MG1 CE IB1 | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,085.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | IB 230 kV MG 500 kV FORTALEZA II MG1 CE IB1 | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$373,459.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | IB 230 kV MG 500 kV FORTALEZA II MG1 CE IB1 | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$344,284.16 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | IB 230 kV MG 500 kV FORTALEZA II MG1 CE IB1 | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RMEL | REN 443/2011 | 6/9/2017 | 12/5/2049 | R$40,620.04 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DA CHAVE SECCIONADORA 34D1-2 DA SUB FORTALEZA II * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | IB 230 kV MG 500 kV FORTALEZA II MG1 CE IB1 | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RBNI | REA 6137/2016 | 10/1/2021 | 10/4/2051 | R$65,598.60 | 6/1/2025 | Ativa | T2016-089 | Remanejamento do módulo de interligação de barras IB1 para nova posição *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | FORTALEZA II | IB 230 kV MG 500 kV FORTALEZA II MG1 CE BARRA2 | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RBNI | REA 6137/2016 | 10/1/2021 | 9/30/2054 | R$348,080.07 | 6/1/2025 | Ativa | T2016-089 | Instalação, na Subestação Fortaleza II, de um disjuntor seccionador da barra 2 em 230 kV *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | FORTALEZA II | IB 230 kV MG 500 kV FORTALEZA II MG1 CE BARRA1 | RB | FT MG 500 kV FORTALEZA II MG1 CE | 061/2001 | IPCA | RBNI | REA 6137/2016 | 10/1/2021 | 9/30/2054 | R$346,457.89 | 6/1/2025 | Ativa | T2016-089 | Instalação, na Subestação Fortaleza II, de um disjuntor seccionador da barra 1 em 230 kV *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | FORTALEZA II | EL 500 kV FORTALEZA II LT 500 kV QUIXADA /FORTALEZA II C-1 CE | RB | FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$469,641.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 500 kV FORTALEZA II LT 500 kV QUIXADA /FORTALEZA II C-1 CE | RB | FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/4/2021 | 1/7/2051 | R$65,620.39 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 500 kV FORTALEZA II LT 500 kV QUIXADA /FORTALEZA II C-1 CE | RB | FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBNI | REA 5861/2016 | 8/20/2018 | 8/19/2033 | R$34,942.69 | 6/1/2025 | Ativa | Implantação de Unidade de Medição Fasorial – PMU nos bays das LT 500 kV Quixada / Fortaleza II C-1 . Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 500 kV FORTALEZA II LT 500 kV PECEM II /FORTALEZA II C-2 CE | RB | FT LT 500 kV PECEM II /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$469,641.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 500 kV FORTALEZA II LT 500 kV PECEM II /FORTALEZA II C-2 CE | RB | FT LT 500 kV PECEM II /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,317,894.34 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 500 kV FORTALEZA II LT 500 kV PECEM II /FORTALEZA II C-2 CE | RB | FT LT 500 kV PECEM II /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,214,937.56 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 500 kV FORTALEZA II LT 500 kV PECEM II /FORTALEZA II C-2 CE | RB | FT LT 500 kV PECEM II /FORTALEZA II C-2 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/14/2022 | 4/16/2052 | R$111,488.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 500 kV FORTALEZA II LT 500 kV PECEM II /FORTALEZA II C-2 CE | RB | FT LT 500 kV PECEM II /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBNI | REA 5861/2016 | 8/20/2018 | 10/28/2036 | R$59,413.91 | 6/1/2025 | Ativa | Implantação de Unidade de Medição Fasorial – PMU nos bays das LT 500 kV Fortaleza II / Pecem II C-1. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV MARACANAU /FORTALEZA II C-1 CE | RB | FT LT 230 kV MARACANAU /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV MARACANAU /FORTALEZA II C-1 CE | RB | FT LT 230 kV MARACANAU /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$612,763.88 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV MARACANAU /FORTALEZA II C-1 CE | RB | FT LT 230 kV MARACANAU /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$564,893.43 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-2 CE | RB | FT LT 230 kV FORTALEZA II /PICI II C-2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-2 CE | RB | FT LT 230 kV FORTALEZA II /PICI II C-2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$612,763.88 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-2 CE | RB | FT LT 230 kV FORTALEZA II /PICI II C-2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$564,893.43 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-2 CE | RB | FT LT 230 kV FORTALEZA II /PICI II C-2 CE | 061/2001 | IPCA | RBNI | REA 6137/2016 | 1/21/2021 | 2/3/2051 | R$65,264.25 | 6/1/2025 | Ativa | T2016-089 | Adequação do módulo de entrada de linha 230 kV FORTALEZA II /PICI II C-2 com a substituição de três transformadores de corrente e implantação de proteção de barra adaptativa conjugada com falha de disjuntor. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-2 CE | RB | FT LT 230 kV FORTALEZA II /PICI II C-2 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/26/2021 | 9/29/2051 | R$19,209.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-1 CE | RB | FT LT 230 kV FORTALEZA II /PICI II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-1 CE | RB | FT LT 230 kV FORTALEZA II /PICI II C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$612,763.88 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-1 CE | RB | FT LT 230 kV FORTALEZA II /PICI II C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$564,893.43 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-1 CE | RB | FT LT 230 kV FORTALEZA II /PICI II C-1 CE | 061/2001 | IPCA | RBNI | REA 6137/2016 | 2/3/2021 | 2/16/2051 | R$65,321.22 | 6/1/2025 | Ativa | T2016-089 | Adequação do módulo de entrada de linha 230 kV FORTALEZA II /PICI II C-1 com a substituição de três transformadores de corrente e implantação de proteção de barra adaptativa conjugada com falha de disjuntor. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-1 CE | RB | FT LT 230 kV FORTALEZA II /PICI II C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/30/2019 | 10/2/2049 | R$36,290.40 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-3 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-3 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$612,763.88 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-3 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$564,893.43 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-3 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/22/2019 | 9/16/2047 | R$26,134.73 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-3 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE | 061/2001 | IPCA | RBNI | REA 2040/2009 | 6/30/2019 | 7/2/2049 | R$122,594.05 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 230 kV associadas ao Disjuntor 14Z4. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-2 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-2 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$612,763.88 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-2 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$564,893.43 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-2 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBNI | REA 6137/2016 | 2/3/2021 | 2/16/2051 | R$65,321.22 | 6/1/2025 | Ativa | T2016-089 | Adequação do módulo de entrada de linha 230 kV FORTALEZA /FORTALEZA II C-2 com a substituição de três transformadores de corrente e implantação de proteção de barra adaptativa conjugada com falha de disjuntor. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-2 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBNI | REA 7761/2019 | 12/31/2019 | 12/30/2047 | R$34,882.59 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE SISTEMAS DE PROTEÇÃO EM 02 TERMINAIS DE LINHA LTs 04Z5. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-1 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-1 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$612,763.88 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-1 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$564,893.43 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-1 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBNI | REA 6137/2016 | 2/3/2021 | 2/16/2051 | R$65,321.22 | 6/1/2025 | Ativa | T2016-089 | Adequação do módulo de entrada de linha 230 kV FORTALEZA /FORTALEZA II C-1 com a substituição de três transformadores de corrente e implantação de proteção de barra adaptativa conjugada com falha de disjuntor. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-1 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBNI | REA 7761/2019 | 12/31/2019 | 12/30/2047 | R$17,750.36 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE SISTEMAS DE PROTEÇÃO EM 02 TERMINAIS DE LINHA LTs 04Z4 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-1 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBNI | REA 2040/2009 | 6/30/2019 | 7/2/2049 | R$155,057.59 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 230 kV associadas ao Disjuntor 14Z4. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE | RB | FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE | RB | FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV CAUIPE /FORTALEZA II C-2 CE | RB | FT LT 230 kV CAUIPE /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV CAUIPE /FORTALEZA II C-2 CE | RB | FT LT 230 kV CAUIPE /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBNI | REA 6137/2016 | 1/20/2021 | 2/2/2051 | R$65,259.17 | 6/1/2025 | Ativa | T2016-089 | Adequação do módulo de entrada de linha 230 kV CAUIPE /FORTALEZA II C-2 com a substituição de três transformadores de corrente e implantação de proteção de barra adaptativa conjugada com falha de disjuntor. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | FORTALEZA II | EL 230 kV FORTALEZA II LT 230 kV CAUIPE /FORTALEZA II C-1 CE | RB | FT LT 230 kV CAUIPE /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | FOZ DO CHAPECO | TR 230/138 kV FOZ DO CHAPECO TR4 RS | RBF | FT TR 230/138 kV FOZ DO CHAPECO TR4 RS | 002/2011 | IPCA | RBNI | REA 8795/2020 | 5/6/2022 | 5/6/2056 | R$999,430.62 | 6/1/2025 | Ativa | T2020-023 | Instalar, na SE FOZ DO CHAPECO, de uma transformação trifásica TR4 230/138-13,8 KV - 50 MVA. | ||
| AXIA Energia Sul | FOZ DO CHAPECO | TR 230/138 kV FOZ DO CHAPECO TR3 RS | RBF | FT TR 230/138 kV FOZ DO CHAPECO TR3 RS | 002/2011 | IPCA | RBNI | REA 4056/2013 | 5/15/2015 | 5/15/2050 | R$913,827.19 | 6/1/2025 | Ativa | T2013-026 | I - instalação do 3º autotransformador trifásico 230/138-13,8 kV, 50 MVA; * Receita Revisada no reajuste do ciclo 2016-2017 *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Sul | FOZ DO CHAPECO | TR 230/138 kV FOZ DO CHAPECO TR2 RS | RBF | FT TR 230/138 kV FOZ DO CHAPECO TR2 RS | 002/2011 | IPCA | RBL | CC 002/2011 | 2/21/2013 | 6/16/2041 | R$819,217.06 | 6/1/2025 | Ativa | A SE 230 kV Foz do Chapecó existente(barramento e interligação de barra em 230 kV) será transferida sem ônus para a RS Energia, sendo o O&M destas instalações já considerado no cálculo da RAP Teto do Leilão.*(Considera adicional de RGR relativo à prorrogação do encargo, de acordo com a RH 1.150, de 07/06/2011) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Sul | FOZ DO CHAPECO | TR 230/138 kV FOZ DO CHAPECO TR1 RS | RBF | FT TR 230/138 kV FOZ DO CHAPECO TR1 RS | 002/2011 | IPCA | RBL | CC 002/2011 | 2/21/2013 | 6/16/2041 | R$819,217.06 | 6/1/2025 | Ativa | A SE 230 kV Foz do Chapecó existente(barramento e interligação de barra em 230 kV) será transferida sem ônus para a RS Energia, sendo o O&M destas instalações já considerado no cálculo da RAP Teto do Leilão.*(Considera adicional de RGR relativo à prorrogação do encargo, de acordo com a RH 1.150, de 07/06/2011) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Sul | FOZ DO CHAPECO | MG 230 kV FOZ DO CHAPECO MG1 RS | RB | FT MG 230 kV FOZ DO CHAPECO MG1 RS | 002/2011 | IPCA | RBL | CC 002/2011 | 2/21/2013 | 6/16/2041 | R$779,477.68 | 6/1/2025 | Ativa | A SE 230 kV Foz do Chapecó existente(barramento e interligação de barra em 230 kV) será transferida sem ônus para a RS Energia, sendo o O&M destas instalações já considerado no cálculo da RAP Teto do Leilão.*(Considera adicional de RGR relativo à prorrogação do encargo, de acordo com a RH 1.150, de 07/06/2011) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Sul | FOZ DO CHAPECO | MG 230 kV FOZ DO CHAPECO MG1 RS | RB | FT MG 230 kV FOZ DO CHAPECO MG1 RS | 002/2011 | IPCA | RBNI | REA 4056/2013 | 5/15/2015 | 5/15/2047 | R$100,775.03 | 6/1/2025 | Ativa | T2013-026 | IV - complemento do Módulo Geral: implantação dos módulo de infraestrutura de manobra referentes às conexões do 3° autotransformador 230/138-13,8 kV. * Receita Revisada no reajuste do ciclo 2016-2017 *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Sul | FOZ DO CHAPECO | MG 230 kV FOZ DO CHAPECO MG1 RS | RB | FT MG 230 kV FOZ DO CHAPECO MG1 RS | 002/2011 | IPCA | RBNI | REA 6427/2017 | 10/28/2016 | 6/15/2041 | R$10,920.66 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de módulo de infraestrutura de manobra da Entrada de Linha para LT 230 kV Foz do Chapecó - Guarita transferida pela FCE à Eletrosul *(Receita revisada em 21/06/2021) | |||
| AXIA Energia Sul | FOZ DO CHAPECO | MG 230 kV FOZ DO CHAPECO MG1 RS | RB | FT MG 230 kV FOZ DO CHAPECO MG1 RS | 002/2011 | IPCA | RBNI | REN 443/2011 | 4/29/2015 | 4/28/2046 | R$82,696.14 | 6/1/2025 | Ativa | Módulo de infraestrutura de manobra associada ao módulo de entrada de linha para a SE Chapecó 2. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018. (RAP ALTERADA NO RECURSO CONTRA A REH 2.258/2017) *(Receita revisada em 21/06/2021) | |||
| AXIA Energia Sul | FOZ DO CHAPECO | MG 230 kV FOZ DO CHAPECO MG1 RS | RB | FT MG 230 kV FOZ DO CHAPECO MG1 RS | 002/2011 | IPCA | RBNI | REA 6454/2017 | 6/16/2016 | 6/15/2041 | R$21,841.33 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de módulo de infraestrutura de manobra associados às entradas de linha em 230 kV, arranjo barra dupla a quatro chaves, na subestação Foz do Chapecó, da linha de transmissão 230 kV Foz do Chapecó - Xanxerê. *(Receita revisada em 21/06/2021) | |||
| AXIA Energia Sul | FOZ DO CHAPECO | MG 230 kV FOZ DO CHAPECO MG1 RS | RB | FT MG 230 kV FOZ DO CHAPECO MG1 RS | 002/2011 | IPCA | RBNI | REA 8795/2020 | 5/6/2022 | 5/6/2053 | R$153,532.49 | 6/1/2025 | Ativa | T2020-023 | Complementação do módulo geral da SE Foz do Chapecó com a instalação de um módulo de infraestrutura de manobra de 230 kV | ||
| AXIA Energia Sul | FOZ DO CHAPECO | MG 230 kV FOZ DO CHAPECO MG1 RS | RB | FT MG 230 kV FOZ DO CHAPECO MG1 RS | 002/2011 | IPCA | RBNI | REA 8795/2020 | 5/6/2022 | 5/6/2053 | R$107,355.45 | 6/1/2025 | Ativa | T2020-023 | Complementação do módulo geral da SE Foz do Chapecó com a instalação de um módulo de infraestrutura de manobra de 138 kV | ||
| AXIA Energia Sul | FOZ DO CHAPECO | MC 230 kV TR 230/138 kV FOZ DO CHAPECO TR4 RS | RBF | FT TR 230/138 kV FOZ DO CHAPECO TR4 RS | 002/2011 | IPCA | RBNI | REA 8795/2020 | 5/6/2022 | 5/6/2049 | R$ 1,003,809.44 | 6/1/2025 | Ativa | T2020-023 | Instalar, na SE FOZ DO CHAPECO, um módulo de conexão, em 230 kV, para o transformador trifásico TR4 230/138 kV - 50 MVA, arranjo Barra Dupla a Quatro Chaves. | ||
| AXIA Energia Sul | FOZ DO CHAPECO | MC 230 kV TR 230/138 kV FOZ DO CHAPECO TR3 RS | RBF | FT TR 230/138 kV FOZ DO CHAPECO TR3 RS | 002/2011 | IPCA | RBNI | REA 4056/2013 | 5/15/2015 | 5/15/2039 | R$628,043.03 | 6/1/2025 | Ativa | T2013-026 | II - instalação de módulo de conexão 230 kV referente ao 3º autotransformador 230/138-13,8 kV. * Receita Revisada no reajuste do ciclo 2016-2017 *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Sul | FOZ DO CHAPECO | MC 230 kV TR 230/138 kV FOZ DO CHAPECO TR2 RS | RBF | FT TR 230/138 kV FOZ DO CHAPECO TR2 RS | 002/2011 | IPCA | RBL | CC 002/2011 | 2/21/2013 | 6/16/2041 | R$365,598.99 | 6/1/2025 | Ativa | A SE 230 kV Foz do Chapecó existente(barramento e interligação de barra em 230 kV) será transferida sem ônus para a RS Energia, sendo o O&M destas instalações já considerado no cálculo da RAP Teto do Leilão.*(Considera adicional de RGR relativo à prorrogação do encargo, de acordo com a RH 1.150, de 07/06/2011) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Sul | FOZ DO CHAPECO | MC 230 kV TR 230/138 kV FOZ DO CHAPECO TR1 RS | RBF | FT TR 230/138 kV FOZ DO CHAPECO TR1 RS | 002/2011 | IPCA | RBL | CC 002/2011 | 2/21/2013 | 6/16/2041 | R$365,598.99 | 6/1/2025 | Ativa | A SE 230 kV Foz do Chapecó existente(barramento e interligação de barra em 230 kV) será transferida sem ônus para a RS Energia, sendo o O&M destas instalações já considerado no cálculo da RAP Teto do Leilão.*(Considera adicional de RGR relativo à prorrogação do encargo, de acordo com a RH 1.150, de 07/06/2011) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Sul | FOZ DO CHAPECO | MC 138 kV TR 230/138 kV FOZ DO CHAPECO TR4 RS | RBF | FT TR 230/138 kV FOZ DO CHAPECO TR4 RS | 002/2011 | IPCA | RBNI | REA 8795/2020 | 5/6/2022 | 5/6/2048 | R$802,808.05 | 6/1/2025 | Ativa | T2020-023 | Instalar, na SE FOZ DO CHAPECO, um módulo de conexão, em 138 kV, para o transformador trifásico TR4 230/138 kV - 50 MVA, arranjo Barra Dupla a Quatro Chaves. | ||
| AXIA Energia Sul | FOZ DO CHAPECO | MC 138 kV TR 230/138 kV FOZ DO CHAPECO TR3 RS | RBF | FT TR 230/138 kV FOZ DO CHAPECO TR3 RS | 002/2011 | IPCA | RBNI | REA 4056/2013 | 5/15/2015 | 5/15/2037 | R$496,158.59 | 6/1/2025 | Ativa | T2013-026 | III - instalação de módulo de conexão 138 kV, arranjo barra dupla 4 chaves, referente ao 3º auotransformador 230/138-13,8 kV. * Receita Revisada no reajuste do ciclo 2016-2017 *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Sul | FOZ DO CHAPECO | MC 138 kV TR 230/138 kV FOZ DO CHAPECO TR2 RS | RBF | FT TR 230/138 kV FOZ DO CHAPECO TR2 RS | 002/2011 | IPCA | RBL | CC 002/2011 | 2/21/2013 | 6/16/2041 | R$278,413.95 | 6/1/2025 | Ativa | A SE 230 kV Foz do Chapecó existente(barramento e interligação de barra em 230 kV) será transferida sem ônus para a RS Energia, sendo o O&M destas instalações já considerado no cálculo da RAP Teto do Leilão.*(Considera adicional de RGR relativo à prorrogação do encargo, de acordo com a RH 1.150, de 07/06/2011) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Sul | FOZ DO CHAPECO | MC 138 kV TR 230/138 kV FOZ DO CHAPECO TR1 RS | RBF | FT TR 230/138 kV FOZ DO CHAPECO TR1 RS | 002/2011 | IPCA | RBL | CC 002/2011 | 2/21/2013 | 6/16/2041 | R$278,413.95 | 6/1/2025 | Ativa | A SE 230 kV Foz do Chapecó existente(barramento e interligação de barra em 230 kV) será transferida sem ônus para a RS Energia, sendo o O&M destas instalações já considerado no cálculo da RAP Teto do Leilão.*(Considera adicional de RGR relativo à prorrogação do encargo, de acordo com a RH 1.150, de 07/06/2011) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Sul | FOZ DO CHAPECO | IB 138 kV MG 230 kV FOZ DO CHAPECO MG1 RS IB1 | DIT | 002/2011 | IPCA | RPEC | CC 002/2011 | 6/16/2011 | 6/16/2041 | R$195,358.80 | 6/1/2025 | Ativa | T2011-100 | *(Considera adicional de RGR relativo à prorrogação do encargo, de acordo com a RH 1.150, de 07/06/2011) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Sul | FOZ DO CHAPECO | EL 230 kV FOZ DO CHAPECO LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-2 RS/SC | RB | FT LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-2 RS/SC | 002/2011 | IPCA | RBNI | REA 6454/2017 | 6/16/2016 | 6/15/2041 | R$151,319.24 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla a quatro chaves, na subestação Foz do Chapecó, associada ao circuito 2 da linha de transmissão 230 kV Foz do Chapecó - Xanxerê. *(Receita revisada em 21/06/2021) | |||
| AXIA Energia Sul | FOZ DO CHAPECO | EL 230 kV FOZ DO CHAPECO LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-1 RS/SC | RB | FT LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-1 RS/SC | 002/2011 | IPCA | RBNI | REA 6454/2017 | 6/16/2016 | 6/15/2041 | R$151,319.24 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla a quatro chaves, na subestação Foz do Chapecó, associada ao circuito 1 da linha de transmissão 230 kV Foz do Chapecó - Xanxerê. *(Receita revisada em 21/06/2021) | |||
| AXIA Energia Sul | FOZ DO CHAPECO | EL 230 kV FOZ DO CHAPECO LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-2 RS/SC | RB | FT LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-2 RS/SC | 007/2014 | IPCA | RBL | CC 007/2014 | 2/28/2018 | 1/29/2044 | R$680,534.97 | 6/1/2025 | Ativa | T2014-021-C | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | FOZ DO CHAPECO | EL 230 kV FOZ DO CHAPECO LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-1 RS/SC | RB | FT LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-1 RS/SC | 007/2014 | IPCA | RBL | CC 007/2014 | 2/28/2018 | 1/29/2044 | R$680,534.97 | 6/1/2025 | Ativa | T2014-021-B | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | FOZ DO CHAPECO | EL 230 kV FOZ DO CHAPECO LT 230 kV FOZ DO CHAPECO /GUARITA C-1 RS | RB | FT LT 230 kV FOZ DO CHAPECO /GUARITA C-1 RS | 002/2011 | IPCA | RBNI | REA 6427/2017 | 10/28/2016 | 6/15/2041 | R$151,319.24 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla a quatro chaves, na subestação Foz do Chapecó, associada à linha de transmissão 230 kV Foz do Chapecó - Guarita. *(Receita revisada em 21/06/2021) | |||
| AXIA Energia Sul | FOZ DO CHAPECO | EL 138 kV FOZ DO CHAPECO PLANALTO | DIT | 002/2011 | IPCA | RPEC | CC 002/2011 | 6/16/2011 | 6/16/2041 | R$382,620.98 | 6/1/2025 | Ativa | T2011-100 | *(Considera adicional de RGR relativo à prorrogação do encargo, de acordo com a RH 1.150, de 07/06/2011) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Sul | FOZ DO CHAPECO | EL 138 kV FOZ DO CHAPECO CHAPECO 2 | DIT | 002/2011 | IPCA | RCDM | REN 443/2011 | 4/29/2015 | 4/28/2037 | R$862,093.87 | 6/1/2025 | Ativa | Entrada de Linha 138kV para a SE Chapecó 2 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 (RAP ALTERADA NO RECURSO CONTRA A REH 2.258/2017) *(Receita revisada em 21/06/2021) | ||||
| AXIA Energia Nordeste | FUNIL | TR 230/138 kV FUNIL TR6 BA | RBF | FT TR 230/138 kV FUNIL TR6 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,822.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | TR 230/138 kV FUNIL TR6 BA | RBF | FT TR 230/138 kV FUNIL TR6 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,040,589.26 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | TR 230/138 kV FUNIL TR6 BA | RBF | FT TR 230/138 kV FUNIL TR6 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/17/2022 | 12/25/2056 | R$118,761.76 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | TR 230/138 kV FUNIL TR3 BA | RBF | FT TR 230/138 kV FUNIL TR3 BA | 061/2001 | IPCA | RBNI | REA 2173/2009 | 1/24/2013 | 10/15/2047 | R$ 1,307,197.44 | 6/1/2025 | Ativa | T2009-188 | Obra de Substituição Completa - Substituir o transformador 230/138 kV - 66 MVA por outro transformador 230/138 kV - 100 MVA. RAP corrigida de modo a considerar a Receita autorizada total do equipamento novo. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | FUNIL | TR 230/138 kV FUNIL TR2 BA | RBF | FT TR 230/138 kV FUNIL TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,822.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | TR 230/138 kV FUNIL TR2 BA | RBF | FT TR 230/138 kV FUNIL TR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,040,589.26 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | TR 230/138 kV FUNIL TR2 BA | RBF | FT TR 230/138 kV FUNIL TR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$959,296.16 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | TR 230/138 kV FUNIL TR1 BA | RBF | FT TR 230/138 kV FUNIL TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,822.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | TR 230/138 kV FUNIL TR1 BA | RBF | FT TR 230/138 kV FUNIL TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,040,589.26 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | TR 230/138 kV FUNIL TR1 BA | RBF | FT TR 230/138 kV FUNIL TR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/4/2022 | 12/12/2056 | R$151,508.54 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | TR 230/13,8 kV FUNIL TR1 BA | RB | FT CE 200/-100 MvAr FUNIL CE1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$633,438.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | TR 138/13,8 kV FUNIL TRR1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$155,347.19 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | TR 138/13,8 kV FUNIL TRR1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$435,930.47 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | TR 138/13,8 kV FUNIL TRR1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$401,874.64 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | TR 138/13,8 kV FUNIL TR9 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$155,347.19 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | TR 138/13,8 kV FUNIL TR9 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$435,930.47 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | TR 138/13,8 kV FUNIL TR9 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$401,874.64 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | TR 138/115 kV FUNIL TR7 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$207,130.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | TR 138/115 kV FUNIL TR7 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$581,242.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | TR 138/115 kV FUNIL TR7 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$535,834.50 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | RTB 230 kV 7,4 Mvar FUNIL RTR1 BA | RB | FT RTB 230 kV 7,4 MVAr FUNIL RTR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$102,477.93 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | RTB 230 kV 7,4 Mvar FUNIL RTR1 BA | RB | FT RTB 230 kV 7,4 MVAr FUNIL RTR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$287,570.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | RTB 230 kV 7,4 Mvar FUNIL RTR1 BA | RB | FT RTB 230 kV 7,4 MVAr FUNIL RTR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$265,104.77 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | RTB 230 kV 22,2 Mvar FUNIL RT2 BA | RB | FT RTB 230 kV 22,2 Mvar FUNIL RT2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$307,433.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | RTB 230 kV 22,2 Mvar FUNIL RT2 BA | RB | FT RTB 230 kV 22,2 Mvar FUNIL RT2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$862,711.17 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | RTB 230 kV 22,2 Mvar FUNIL RT2 BA | RB | FT RTB 230 kV 22,2 Mvar FUNIL RT2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$795,314.30 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | RTB 230 kV 20 Mvar FUNIL RT1 BA | RB | FT RTB 230 kV 20 Mvar FUNIL RT1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$216,371.11 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | RTB 230 kV 20 Mvar FUNIL RT1 BA | RB | FT RTB 230 kV 20 Mvar FUNIL RT1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 2/12/2014 | 1/22/2050 | R$31,045.41 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BUCHAS HSP 230 KV TIPO OTF DOS REATORES 04E2 A/B/C E R Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | MG 230 kV FUNIL MG1 BA | RB | FT MG 230 kV FUNIL MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$794,891.99 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MG 230 kV FUNIL MG1 BA | RB | FT MG 230 kV FUNIL MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 2/7/2014 | 2/6/2029 | R$12,912.94 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE AMPLIFICADORES ÓPTICOS EM FINAL DE VIDA ÚTIL Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | MG 230 kV FUNIL MG1 BA | RB | FT MG 230 kV FUNIL MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/20/2015 | 12/19/2030 | R$14,665.28 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SWITCH.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | MG 230 kV FUNIL MG1 BA | RB | FT MG 230 kV FUNIL MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 8/17/2014 | 8/25/2045 | R$52,760.42 | 6/1/2025 | Ativa | Revitalização Necessária: SUBSTITUIÇÃO DO TC 91BP FASES (A,B e C). Incluído no recurso contra a REH 2.098/2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | MG 230 kV FUNIL MG1 BA | RB | FT MG 230 kV FUNIL MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,230,601.24 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MG 230 kV FUNIL MG1 BA | RB | FT MG 230 kV FUNIL MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,056,341.80 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MG 230 kV FUNIL MG1 BA | RB | FT MG 230 kV FUNIL MG1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 6/30/2016 | 6/29/2044 | R$44,298.13 | 6/1/2025 | Ativa | Revitalização Necessária: SUBSTITUIÇÃO DO CONCENTRADOR DE DADOS PARA ATENDIMENTO AO AUMENTO DA OBSERVABILIDADE ASSOCIADA AO PROCEDIMENTO DE REDE 2.7 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | MG 230 kV FUNIL MG1 BA | RB | FT MG 230 kV FUNIL MG1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 2/26/2016 | 2/25/2033 | R$7,390.12 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BATERIAS - 125Vcc * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | MG 230 kV FUNIL MG1 BA | RB | FT MG 230 kV FUNIL MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/20/2020 | 4/13/2038 | R$505,708.84 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | FUNIL | MG 138 kV FUNIL MG1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$261,386.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | FUNIL | MG 138 kV FUNIL MG1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,003,039.48 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | FUNIL | MG 138 kV FUNIL MG1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/21/2016 | 8/16/2029 | R$1,909.13 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (004254/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | FUNIL | MG 138 kV FUNIL MG1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 4/16/2016 | 2/18/2032 | R$303,187.74 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FUNIL | MC 230 kV TR 230/138 kV FUNIL TR6 BA | RBF | FT TR 230/138 kV FUNIL TR6 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV TR 230/138 kV FUNIL TR6 BA | RBF | FT TR 230/138 kV FUNIL TR6 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$454,511.36 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV TR 230/138 kV FUNIL TR6 BA | RBF | FT TR 230/138 kV FUNIL TR6 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$419,003.95 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV TR 230/138 kV FUNIL TR6 BA | RBF | FT TR 230/138 kV FUNIL TR6 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/5/2020 | 1/4/2044 | R$24,049.15 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV TR 230/138 kV FUNIL TR3 BA | RBF | FT TR 230/138 kV FUNIL TR3 BA | 061/2001 | IPCA | RBNI | REA 2173/2009 | 1/24/2013 | 1/23/2041 | R$141,238.45 | 6/1/2025 | Ativa | T2009-188 | Adequar a CT 230 kV devido à substituição do transformador 230/138 kV - 66 MVA por outro transformador 230/138 kV - 100 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | FUNIL | MC 230 kV TR 230/138 kV FUNIL TR3 BA | RBF | FT TR 230/138 kV FUNIL TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV TR 230/138 kV FUNIL TR3 BA | RBF | FT TR 230/138 kV FUNIL TR3 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$454,511.36 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV TR 230/138 kV FUNIL TR3 BA | RBF | FT TR 230/138 kV FUNIL TR3 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$419,003.95 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV TR 230/138 kV FUNIL TR3 BA | RBF | FT TR 230/138 kV FUNIL TR3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/22/2020 | 4/22/2049 | R$64,633.41 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV TR 230/138 kV FUNIL TR2 BA | RBF | FT TR 230/138 kV FUNIL TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV TR 230/138 kV FUNIL TR2 BA | RBF | FT TR 230/138 kV FUNIL TR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$454,511.36 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV TR 230/138 kV FUNIL TR2 BA | RBF | FT TR 230/138 kV FUNIL TR2 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 3/25/2015 | 3/24/2039 | R$18,393.07 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE PARARAIOS, POSIÇÃO 74T2 FASES A,B E C DA SE FUNIL * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV TR 230/138 kV FUNIL TR2 BA | RBF | FT TR 230/138 kV FUNIL TR2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/10/2022 | 2/22/2052 | R$219,622.33 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV TR 230/138 kV FUNIL TR1 BA | RBF | FT TR 230/138 kV FUNIL TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV TR 230/138 kV FUNIL TR1 BA | RBF | FT TR 230/138 kV FUNIL TR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/9/2021 | 11/25/2051 | R$466,088.97 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV TR 230/13,8 kV FUNIL TR1 BA | RB | FT CE 200/-100 MvAr FUNIL CE1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV TR 230/13,8 kV FUNIL TR1 BA | RB | FT CE 200/-100 MvAr FUNIL CE1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/2/2022 | 5/1/2037 | R$2,310.97 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV RTB 230 kV 22,2 Mvar FUNIL RT2 BA | RB | FT RTB 230 kV 22,2 Mvar FUNIL RT2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$155,328.61 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV RTB 230 kV 22,2 Mvar FUNIL RT2 BA | RB | FT RTB 230 kV 22,2 Mvar FUNIL RT2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$435,878.34 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV RTB 230 kV 22,2 Mvar FUNIL RT2 BA | RB | FT RTB 230 kV 22,2 Mvar FUNIL RT2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$401,826.57 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV RTB 230 kV 22,2 Mvar FUNIL RT2 BA | RB | FT RTB 230 kV 22,2 Mvar FUNIL RT2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/5/2020 | 1/7/2050 | R$20,770.12 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV RTB 230 kV 20 Mvar FUNIL RT1 BA | RB | FT RTB 230 kV 20 Mvar FUNIL RT1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$155,328.61 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV RTB 230 kV 20 Mvar FUNIL RT1 BA | RB | FT RTB 230 kV 20 Mvar FUNIL RT1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$435,878.34 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV RTB 230 kV 20 Mvar FUNIL RT1 BA | RB | FT RTB 230 kV 20 Mvar FUNIL RT1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/30/2021 | 11/24/2040 | R$3,896.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV BC 230 kV 50,5 Mvar FUNIL BC2 BA | RB | FT BC 230 kV 50,5 MVAr FUNIL BC2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,919.88 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV BC 230 kV 50,5 Mvar FUNIL BC2 BA | RB | FT BC 230 kV 50,5 MVAr FUNIL BC2 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 4/15/2016 | 4/14/2049 | R$43,851.08 | 6/1/2025 | Ativa | Substituição de Disjuntores, ABB - ASEA BROWN BOVERI_HPL245B1 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV BC 230 kV 50,5 Mvar FUNIL BC2 BA | RB | FT BC 230 kV 50,5 MVAr FUNIL BC2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/5/2020 | 1/7/2050 | R$11,039.94 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV BC 230 kV 50,5 Mvar FUNIL BC1 BA | RB | FT BC 230 kV 50,5 MVAr FUNIL BC1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,919.88 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV BC 230 kV 50,5 Mvar FUNIL BC1 BA | RB | FT BC 230 kV 50,5 MVAr FUNIL BC1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/7/2015 | 12/22/2048 | R$102,856.24 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de Disjuntores, ABB - ASEA BROWN BOVERI_HPL245B1, posição 14H1 .Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV BC 230 kV 50,5 Mvar FUNIL BC1 BA | RB | FT BC 230 kV 50,5 MVAr FUNIL BC1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$431,925.18 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV BC 230 kV 50,5 Mvar FUNIL BC1 BA | RB | FT BC 230 kV 50,5 MVAr FUNIL BC1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$398,182.24 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 230 kV BC 230 kV 50,5 Mvar FUNIL BC1 BA | RB | FT BC 230 kV 50,5 MVAr FUNIL BC1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/28/2020 | 10/1/2050 | R$18,678.41 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | MC 138 kV TR 230/138 kV FUNIL TR6 BA | RBF | FT TR 230/138 kV FUNIL TR6 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$121,132.97 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 138 kV TR 230/138 kV FUNIL TR6 BA | RBF | FT TR 230/138 kV FUNIL TR6 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$339,919.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 138 kV TR 230/138 kV FUNIL TR6 BA | RBF | FT TR 230/138 kV FUNIL TR6 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/14/2021 | 12/17/2051 | R$36,348.73 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | MC 138 kV TR 230/138 kV FUNIL TR3 BA | RBF | FT TR 230/138 kV FUNIL TR3 BA | 061/2001 | IPCA | RBNI | REA 2173/2009 | 1/24/2013 | 1/23/2041 | R$134,770.07 | 6/1/2025 | Ativa | T2009-188 | Adequar a CT 138 kV devido à substituição do transformador 230/138 kV - 66 MVA por outro transformador 230/138 kV - 100 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | FUNIL | MC 138 kV TR 230/138 kV FUNIL TR3 BA | RBF | FT TR 230/138 kV FUNIL TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$121,132.97 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 138 kV TR 230/138 kV FUNIL TR3 BA | RBF | FT TR 230/138 kV FUNIL TR3 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$339,919.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 138 kV TR 230/138 kV FUNIL TR3 BA | RBF | FT TR 230/138 kV FUNIL TR3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/1/2019 | 10/3/2049 | R$46,787.14 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | MC 138 kV TR 230/138 kV FUNIL TR2 BA | RBF | FT TR 230/138 kV FUNIL TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$121,132.97 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 138 kV TR 230/138 kV FUNIL TR2 BA | RBF | FT TR 230/138 kV FUNIL TR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$339,919.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 138 kV TR 230/138 kV FUNIL TR2 BA | RBF | FT TR 230/138 kV FUNIL TR2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/2/2021 | 5/17/2052 | R$280,254.96 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | MC 138 kV TR 230/138 kV FUNIL TR1 BA | RBF | FT TR 230/138 kV FUNIL TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$121,132.97 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 138 kV TR 230/138 kV FUNIL TR1 BA | RBF | FT TR 230/138 kV FUNIL TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$339,919.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 138 kV TR 230/138 kV FUNIL TR1 BA | RBF | FT TR 230/138 kV FUNIL TR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/26/2021 | 6/22/2051 | R$321,559.36 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | MC 138 kV TR 138/13,8 kV FUNIL TR9 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$121,132.97 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | MC 138 kV TR 138/13,8 kV FUNIL TR9 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$339,919.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | MC 138 kV TR 138/13,8 kV FUNIL TR9 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$313,364.31 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | MC 138 kV TR 138/13,8 kV FUNIL TR9 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/17/2021 | 12/16/2049 | R$70,726.58 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FUNIL | MC 138 kV TR 138/115 kV FUNIL TR7 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$121,132.97 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | MC 138 kV TR 138/115 kV FUNIL TR7 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$339,919.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | MC 138 kV TR 138/115 kV FUNIL TR7 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/4/2021 | 4/13/2052 | R$273,213.14 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FUNIL | MC 13,8 kV TR 230/13,8 kV FUNIL TR1 BA | RB | FT CE 200/-100 MvAr FUNIL CE1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$48,477.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | MC 13,8 kV TR 138/13,8 kV FUNIL TR9 BA MC2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | MC 13,8 kV TR 138/13,8 kV FUNIL TR9 BA MC2 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$125,341.16 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | MC 13,8 kV TR 138/13,8 kV FUNIL TR9 BA MC2 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$115,549.23 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | MC 13,8 kV TR 138/13,8 kV FUNIL TR9 BA MC1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | MC 13,8 kV TR 138/13,8 kV FUNIL TR9 BA MC1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$125,341.16 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | MC 13,8 kV TR 138/13,8 kV FUNIL TR9 BA MC1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$115,549.23 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | MC 13,8 kV BC 13,8 kV 3,1 Mvar FUNIL BC2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | MC 13,8 kV BC 13,8 kV 3,1 Mvar FUNIL BC2 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | MC 13,8 kV BC 13,8 kV 3,1 Mvar FUNIL BC2 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/28/2022 | 11/27/2045 | R$3,853.32 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FUNIL | MC 13,8 kV BC 13,8 kV 3,1 Mvar FUNIL BC1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | MC 13,8 kV BC 13,8 kV 3,1 Mvar FUNIL BC1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | MC 115 kV TR 138/115 kV FUNIL TR7 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$121,132.97 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | MC 115 kV TR 138/115 kV FUNIL TR7 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/18/2022 | 8/2/2052 | R$243,928.18 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FUNIL | IB 230 kV MG 230 kV FUNIL MG1 BA IB1 | RB | FT MG 230 kV FUNIL MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,085.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | IB 230 kV MG 230 kV FUNIL MG1 BA IB1 | RB | FT MG 230 kV FUNIL MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$373,459.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | IB 230 kV MG 230 kV FUNIL MG1 BA IB1 | RB | FT MG 230 kV FUNIL MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/22/2022 | 2/25/2052 | R$124,062.79 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | IB 138 kV MG 230 kV FUNIL MG1 BA IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$97,118.82 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | IB 138 kV MG 230 kV FUNIL MG1 BA IB1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/3/2020 | 6/4/2052 | R$175,059.39 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | FUNIL | IB 138 kV MG 138 kV FUNIL MG1 RJ IB1 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$92,690.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | FUNIL | IB 138 kV MG 138 kV FUNIL MG1 RJ IB1 | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$355,688.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | FUNIL | IB 138 kV MG 138 kV FUNIL MG1 RJ IB1 | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$381,317.18 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | IB 13,8 kV MG 230 kV FUNIL MG1 BA IB2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$30,696.61 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | IB 13,8 kV MG 230 kV FUNIL MG1 BA IB2 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$86,139.86 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | IB 13,8 kV MG 230 kV FUNIL MG1 BA IB2 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$79,410.43 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | IB 13,8 kV MG 230 kV FUNIL MG1 BA IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$30,696.61 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | IB 13,8 kV MG 230 kV FUNIL MG1 BA IB1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$86,139.86 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | IB 13,8 kV MG 230 kV FUNIL MG1 BA IB1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$79,410.43 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-2 BA | RB | FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-2 BA | RB | FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-2 BA | RB | FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/1/2016 | 5/4/2046 | R$14,346.60 | 6/1/2025 | Ativa | Substituído TC QDR 245P com alta taxa de falha. Posição Operacional: 94L3-A/. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-2 BA | RB | FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/1/2016 | 5/4/2046 | R$14,346.60 | 6/1/2025 | Ativa | Substituído TC QDR 245P com alta taxa de falha. Posição Operacional: 94L3-B/. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-2 BA | RB | FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/1/2016 | 5/4/2046 | R$14,346.60 | 6/1/2025 | Ativa | Substituído TC QDR 245P com alta taxa de falha. Posição Operacional: 94L3-C/. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-2 BA | RB | FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/10/2019 | 9/16/2045 | R$43,440.05 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-1 BA | RB | FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-1 BA | RB | FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-1 BA | RB | FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA | 061/2001 | IPCA | RBNI | REA 5861/2016 | 6/10/2016 | 6/9/2044 | R$21,851.09 | 6/1/2025 | Ativa | EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-1 BA * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-1 BA | RB | FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/6/2020 | 10/5/2050 | R$418,399.92 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | EL 230 kV FUNIL LT 230 kV SAPEACU /FUNIL C-1 BA | RB | FT LT 230 kV SAPEACU /FUNIL C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | EL 230 kV FUNIL LT 230 kV SAPEACU /FUNIL C-1 BA | RB | FT LT 230 kV SAPEACU /FUNIL C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | EL 230 kV FUNIL LT 230 kV SAPEACU /FUNIL C-1 BA | RB | FT LT 230 kV SAPEACU /FUNIL C-1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 3/13/2016 | 3/16/2046 | R$14,283.52 | 6/1/2025 | Ativa | Substituído TC QDR 245P com alta taxa de falha. Posição Operacional: 94F1-A/. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | EL 230 kV FUNIL LT 230 kV SAPEACU /FUNIL C-1 BA | RB | FT LT 230 kV SAPEACU /FUNIL C-1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 3/13/2016 | 3/16/2046 | R$14,283.52 | 6/1/2025 | Ativa | Substituído TC QDR 245P com alta taxa de falha. Posição Operacional: 94F1-B/. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | EL 230 kV FUNIL LT 230 kV SAPEACU /FUNIL C-1 BA | RB | FT LT 230 kV SAPEACU /FUNIL C-1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 3/13/2016 | 3/16/2046 | R$14,283.52 | 6/1/2025 | Ativa | Substituído TC QDR 245P com alta taxa de falha. Posição Operacional: 94F1-C/. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | EL 230 kV FUNIL LT 230 kV SAPEACU /FUNIL C-1 BA | RB | FT LT 230 kV SAPEACU /FUNIL C-1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 4/24/2016 | 4/23/2040 | R$19,249.72 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE PARARAIOS, POSIÇÃO 74F1 FASE A,B e C DA SUB FUNIL * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | EL 230 kV FUNIL LT 230 kV SAPEACU /FUNIL C-1 BA | RB | FT LT 230 kV SAPEACU /FUNIL C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/19/2022 | 2/13/2053 | R$362,029.07 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | EL 230 kV FUNIL LT 230 kV FUNIL /ITAPEBI C-1 BA | RB | FT LT 230 kV FUNIL /ITAPEBI C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | EL 230 kV FUNIL LT 230 kV FUNIL /ITAPEBI C-1 BA | RB | FT LT 230 kV FUNIL /ITAPEBI C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | EL 230 kV FUNIL LT 230 kV FUNIL /ITAPEBI C-1 BA | RB | FT LT 230 kV FUNIL /ITAPEBI C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$584,375.21 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | EL 230 kV FUNIL LT 230 kV FUNIL /ITAPEBI C-1 BA | RB | FT LT 230 kV FUNIL /ITAPEBI C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/13/2020 | 4/24/2049 | R$72,989.14 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | EL 230 kV FUNIL LT 230 kV FUNIL /ITABUNA III C-1 BA | RB | FT LT 230 kV FUNIL /ITABUNA III C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | EL 230 kV FUNIL LT 230 kV FUNIL /ITABUNA III C-1 BA | RB | FT LT 230 kV FUNIL /ITABUNA III C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | EL 230 kV FUNIL LT 230 kV FUNIL /ITABUNA III C-1 BA | RB | FT LT 230 kV FUNIL /ITABUNA III C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$584,375.21 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | EL 230 kV FUNIL LT 230 kV FUNIL /ITABUNA III C-1 BA | RB | FT LT 230 kV FUNIL /ITABUNA III C-1 BA | 061/2001 | IPCA | RBNI | REA 5861/2016 | 6/9/2016 | 6/8/2044 | R$7,764.32 | 6/1/2025 | Ativa | EL 230 kV FUNIL LT 230 kV FUNIL /ITAPEBI C-2 BA * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | EL 230 kV FUNIL LT 230 kV FUNIL /ITABUNA III C-1 BA | RB | FT LT 230 kV FUNIL /ITABUNA III C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/13/2018 | 5/31/2048 | R$97,761.20 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | FUNIL | EL 138 kV FUNIL LT 138 kV SAUDADE /FUNIL C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | FUNIL | EL 138 kV FUNIL LT 138 kV SAUDADE /FUNIL C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$647,926.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | FUNIL | EL 138 kV FUNIL LT 138 kV SAUDADE /FUNIL C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$694,611.89 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | FUNIL | EL 138 kV FUNIL LT 138 kV SAUDADE /FUNIL C-2 RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/20/2020 | 7/23/2050 | R$19,750.14 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | FUNIL | EL 138 kV FUNIL LT 138 kV SAUDADE /FUNIL C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | FUNIL | EL 138 kV FUNIL LT 138 kV SAUDADE /FUNIL C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$647,926.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | FUNIL | EL 138 kV FUNIL LT 138 kV SAUDADE /FUNIL C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$694,611.89 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | FUNIL | EL 138 kV FUNIL LT 138 kV SAUDADE /FUNIL C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/20/2021 | 12/23/2051 | R$85,145.31 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FUNIL | EL 138 kV FUNIL DIST6 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$176,912.80 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | EL 138 kV FUNIL DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$176,912.80 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | EL 138 kV FUNIL DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$496,447.20 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | EL 138 kV FUNIL DIST5 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/29/2021 | 12/2/2051 | R$180,888.74 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FUNIL | EL 138 kV FUNIL DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$176,912.80 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | EL 138 kV FUNIL DIST4 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 2/23/2014 | 7/6/2045 | R$12,952.66 | 6/1/2025 | Ativa | Revitalização Necessária: SUBSTITUIÇÃO DO TPC ARTECHE 83J4 FASE B. Incluído no recurso em face da REH 2.098/2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | FUNIL | EL 138 kV FUNIL DIST4 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/1/2022 | 10/13/2052 | R$241,260.62 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FUNIL | EL 138 kV FUNIL DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$176,912.80 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | EL 138 kV FUNIL DIST3 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/14/2022 | 10/26/2052 | R$241,486.94 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FUNIL | EL 138 kV FUNIL DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$176,912.80 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | EL 138 kV FUNIL DIST2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/18/2022 | 10/30/2052 | R$241,565.34 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FUNIL | EL 138 kV FUNIL DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$176,912.80 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | EL 138 kV FUNIL DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$496,447.20 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | EL 138 kV FUNIL DIST1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/19/2021 | 10/22/2051 | R$180,331.81 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | FUNIL | EL 13,8 kV FUNIL GER1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | EL 13,8 kV FUNIL GER1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$140,183.79 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | EL 13,8 kV FUNIL GER1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$129,232.33 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | EL 13,8 kV FUNIL DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | EL 13,8 kV FUNIL DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$140,183.79 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | EL 13,8 kV FUNIL DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | EL 13,8 kV FUNIL DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$140,183.79 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | EL 13,8 kV FUNIL DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | EL 13,8 kV FUNIL DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$140,183.79 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | EL 13,8 kV FUNIL DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | EL 13,8 kV FUNIL DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$140,183.79 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | CE 200/-100 Mvar FUNIL CE1 BA | RB | FT CE 200/-100 MvAr FUNIL CE1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,353,109.32 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | CE 200/-100 Mvar FUNIL CE1 BA | RB | FT CE 200/-100 MvAr FUNIL CE1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/27/2021 | 6/26/2046 | R$8,007.54 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | FUNIL | BC 230 kV 50,5 Mvar FUNIL BC2 BA | RB | FT BC 230 kV 50,5 MVAr FUNIL BC2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$191,630.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | BC 230 kV 50,5 Mvar FUNIL BC1 BA | RB | FT BC 230 kV 50,5 MVAr FUNIL BC1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$191,630.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | BC 230 kV 50,5 Mvar FUNIL BC1 BA | RB | FT BC 230 kV 50,5 MVAr FUNIL BC1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$537,748.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUNIL | BC 13,8 kV 3,1 Mvar FUNIL BC2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$29,742.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | FUNIL | BC 13,8 kV 3,1 Mvar FUNIL BC1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$29,742.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | FURNAS | MG 345 kV FURNAS MG1 MG | RB | FT MG 345 kV FURNAS MG1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,319,526.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | FURNAS | MG 345 kV FURNAS MG1 MG | RB | FT MG 345 kV FURNAS MG1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/31/2017 | 3/27/2033 | R$4,954.33 | 6/1/2025 | Ativa | Substituição do Servidores e IHM do Sistema de Supervisão e Controle Local (SAGE) por obsolescência ou por atualização tecnológica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | FURNAS | MG 345 kV FURNAS MG1 MG | RB | FT MG 345 kV FURNAS MG1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 7/5/2016 | 4/1/2030 | R$6,644.52 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (004061/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | FURNAS | MG 345 kV FURNAS MG1 MG | RB | FT MG 345 kV FURNAS MG1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 7/5/2016 | 4/1/2030 | R$6,644.52 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (004470/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | FURNAS | MG 345 kV FURNAS MG1 MG | RB | FT MG 345 kV FURNAS MG1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 7/5/2016 | 4/1/2030 | R$15,455.46 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (005214/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | FURNAS | MG 345 kV FURNAS MG1 MG | RB | FT MG 345 kV FURNAS MG1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 7/5/2016 | 4/1/2030 | R$6,644.52 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (008685/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | FURNAS | MG 345 kV FURNAS MG1 MG | RB | FT MG 345 kV FURNAS MG1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 7/5/2016 | 4/1/2030 | R$30,542.00 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (010473/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | FURNAS | MG 345 kV FURNAS MG1 MG | RB | FT MG 345 kV FURNAS MG1 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/27/2020 | 2/24/2036 | R$ 1,120,530.18 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | FURNAS | MC 345 kV TR 15/345 kV FURNAS TRG8 MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | FURNAS | MC 345 kV TR 15/345 kV FURNAS TRG8 MG | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/7/2014 | 12/7/2045 | R$380,837.70 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | FURNAS | MC 345 kV TR 15/345 kV FURNAS TRG7 MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | FURNAS | MC 345 kV TR 15/345 kV FURNAS TRG7 MG | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/7/2014 | 12/7/2045 | R$380,837.70 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | FURNAS | MC 345 kV TR 15/345 kV FURNAS TRG6 MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | FURNAS | MC 345 kV TR 15/345 kV FURNAS TRG6 MG | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/7/2014 | 12/7/2045 | R$380,837.70 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | FURNAS | MC 345 kV TR 15/345 kV FURNAS TRG5 MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | FURNAS | MC 345 kV TR 15/345 kV FURNAS TRG5 MG | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,046,877.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | FURNAS | MC 345 kV TR 15/345 kV FURNAS TRG4 MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | FURNAS | MC 345 kV TR 15/345 kV FURNAS TRG3 MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | FURNAS | MC 345 kV TR 15/345 kV FURNAS TRG3 MG | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,046,877.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | FURNAS | MC 345 kV TR 15/345 kV FURNAS TRG2 MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | FURNAS | MC 345 kV TR 15/345 kV FURNAS TRG2 MG | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,046,877.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | FURNAS | MC 345 kV TR 15/345 kV FURNAS TRG1 MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | FURNAS | MC 345 kV TR 15/345 kV FURNAS TRG1 MG | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/7/2014 | 12/7/2045 | R$380,837.70 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | FURNAS | IB 345 kV MG 345 kV FURNAS MG1 MG IB2 | RB | FT MG 345 kV FURNAS MG1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | FURNAS | IB 345 kV MG 345 kV FURNAS MG1 MG IB2 | RB | FT MG 345 kV FURNAS MG1 MG | 062/2001 | IPCA | RBNI | REA 1814/2009 | 4/6/2015 | 4/5/2045 | R$201,173.92 | 6/1/2025 | Ativa | Substituição de disjuntor e de 1 chave secionadora 345 kV superados no vão de Amarre. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | FURNAS | IB 345 kV MG 345 kV FURNAS MG1 MG IB2 | RB | FT MG 345 kV FURNAS MG1 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/31/2023 | 12/22/2048 | R$108,112.13 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | FURNAS | IB 345 kV MG 345 kV FURNAS MG1 MG IB1 | RB | FT MG 345 kV FURNAS MG1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | FURNAS | IB 345 kV MG 345 kV FURNAS MG1 MG IB1 | RB | FT MG 345 kV FURNAS MG1 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/31/2023 | 2/2/2053 | R$33,389.56 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | FURNAS | EL 345 kV FURNAS LT 345 kV FURNAS /VARGINHA 4 C-1 MG | RB | FT LT 345 kV FURNAS /VARGINHA 4 C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | FURNAS | EL 345 kV FURNAS LT 345 kV FURNAS /VARGINHA 4 C-1 MG | RB | FT LT 345 kV FURNAS /VARGINHA 4 C-1 MG | 062/2001 | IPCA | RBNI | REA 1814/2009 | 1/30/2012 | 11/9/2037 | R$284,478.94 | 6/1/2025 | Ativa | Substituição de 1 DJ, 5 CS e 3 TC na EL Itutinga *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | FURNAS | EL 345 kV FURNAS LT 345 kV FURNAS /POCOS CALDAS C-2 MG | RB | FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | FURNAS | EL 345 kV FURNAS LT 345 kV FURNAS /POCOS CALDAS C-2 MG | RB | FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG | 062/2001 | IPCA | RBNI | REA 1814/2009 | 9/30/2012 | 12/8/2038 | R$352,450.12 | 6/1/2025 | Ativa | Substituição de 1 DJ, 5 CS e 3 TC na EL Poços II *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | FURNAS | EL 345 kV FURNAS LT 345 kV FURNAS /POCOS CALDAS C-1 MG | RB | FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | FURNAS | EL 345 kV FURNAS LT 345 kV FURNAS /POCOS CALDAS C-1 MG | RB | FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG | 062/2001 | IPCA | RBNI | REA 1814/2009 | 12/2/2012 | 4/10/2039 | R$355,402.43 | 6/1/2025 | Ativa | Substituição de 1 DJ, 5 CS e 3 TC na EL Poços I *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | FURNAS | EL 345 kV FURNAS LT 345 kV FURNAS /PIMENTA C-1 MG | RB | FT LT 345 kV FURNAS /PIMENTA C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | FURNAS | EL 345 kV FURNAS LT 345 kV FURNAS /PIMENTA C-1 MG | RB | FT LT 345 kV FURNAS /PIMENTA C-1 MG | 062/2001 | IPCA | RBNI | REA 1814/2009 | 4/6/2015 | 8/20/2045 | R$174,967.47 | 6/1/2025 | Ativa | Substituição de disjuntor superado: LT Pimenta I. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | FURNAS | EL 345 kV FURNAS LT 345 kV FURNAS /PIMENTA C-1 MG | RB | FT LT 345 kV FURNAS /PIMENTA C-1 MG | 062/2001 | IPCA | RBNI | REA 1814/2009 | 11/24/2014 | 12/16/2041 | R$64,196.20 | 6/1/2025 | Ativa | Substituição de transformadores de corrente na LT para Pimenta (3TC),. INCLUÍDA NO CICLO 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | FURNAS | EL 345 kV FURNAS LT 345 kV FURNAS /M. MORAES C-1 MG | RB | FT LT 345 kV FURNAS /M. MORAES C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | FURNAS | EL 345 kV FURNAS LT 345 kV FURNAS /ITUTINGA C-1 MG | RB | FT LT 345 kV FURNAS /ITUTINGA C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | FURNAS | EL 345 kV FURNAS LT 345 kV FURNAS /ITUTINGA C-1 MG | RB | FT LT 345 kV FURNAS /ITUTINGA C-1 MG | 062/2001 | IPCA | RBNI | REA 1814/2009 | 7/8/2012 | 7/16/2038 | R$348,575.84 | 6/1/2025 | Ativa | Substituição de 1 DJ, 5 CS e 3 TC na EL Itutinga *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | FURNAS | EL 345 kV FURNAS LT 345 kV ESTREITO /FURNAS C-1 MG | RB | FT LT 345 kV ESTREITO /FURNAS C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | FUTURA | MG 500 kV FUTURA MG1 BA | RB | FT MG 500 kV FUTURA MG1 BA | 061/2001 | IPCA | RBNI | DSP 372/2024 | 3/18/2023 | 3/17/2041 | R$72,643.37 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura Geral de Acessante -MIG-A 500 kV na SE Futura, em função do seccionamento da LT 500 kV Juazeiro III - U. Sobradinho C1. | |||
| AXIA Energia Nordeste | FUTURA | MG 500 kV FUTURA MG1 BA | RB | FT MG 500 kV FUTURA MG1 BA | 061/2001 | IPCA | RBNI | DSP 372/2024 | 3/18/2023 | 3/17/2054 | R$83,527.95 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 500 kV na SE Futura, em função do seccionamento da LT 500 kV Juazeiro III - U. Sobradinho C1. | |||
| AXIA Energia Nordeste | FUTURA | IB 500 kV MG 500 kV FUTURA MG1 BA IB1 | RB | FT MG 500 kV FUTURA MG1 BA | 061/2001 | IPCA | RBNI | DSP 372/2024 | 3/18/2023 | 3/17/2055 | R$278,932.06 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Interligação de Barras 500 kV na SE Futura, em função do seccionamento da LT 500 kV Juazeiro III - U. Sobradinho C1. | |||
| AXIA Energia Nordeste | FUTURA | EL 500 kV FUTURA LT 500 kV JUAZEIRO III /FUTURA C-1 BA | RB | FT LT 500 kV JUAZEIRO III /FUTURA C-1 BA | 061/2001 | IPCA | RBNI | DSP 372/2024 | 3/18/2023 | 3/17/2051 | R$261,137.24 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV, arranjo Disjuntor e Meio, na subestação Futura, associada à Linha de Transmissão 500 kV Juazeiro III – Futura C1. | |||
| AXIA Energia Nordeste | FUTURA | EL 500 kV FUTURA LT 500 kV FUTURA /U.SOBRADINHO C-1 BA | RB | FT LT 500 kV FUTURA /U.SOBRADINHO C-1 BA | 061/2001 | IPCA | RBNI | DSP 372/2024 | 3/18/2023 | 3/17/2051 | R$261,137.24 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV, arranjo Disjuntor e Meio, na subestação Futura, associada à Linha de Transmissão 500 kV Futura – U. Sobradinho C1. | |||
| AXIA Energia Nordeste | G.MANGABEIRA | TT 69/13,8 kV G.MANGABEIRA TA1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | G.MANGABEIRA | TT 69/13,8 kV G.MANGABEIRA TA1 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/12/2021 | 12/15/2051 | R$ 887.69 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | G.MANGABEIRA | TT 69/0 kV G.MANGABEIRA TA2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | G.MANGABEIRA | TR 230/69 kV G.MANGABEIRA TR2 BA | RBF | FT TR 230/69 kV G.MANGABEIRA TR2 BA | 061/2001 | IPCA | RBNI | REA 2823/2011 | 5/18/2015 | 1/1/2050 | R$ 1,313,208.46 | 6/1/2025 | Ativa | T2009-122 | Instalar, na SE Governador Mangabeira, um transformador trifásico 230/69 kV, de 100 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | G.MANGABEIRA | TR 230/69 kV G.MANGABEIRA TR1 BA | RBF | FT TR 230/69 kV G.MANGABEIRA TR1 BA | 061/2001 | IPCA | RMEL | REA 9918/2021 | 5/7/2024 | 5/6/2059 | R$ 1,865,740.76 | 6/1/2025 | Ativa | T2020-008 | Obra de Substituição Completa - Substituição do transformador trifásico TR1 230/69 kV - 100 MVA da Subestação Governador Mangabeira. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Nordeste | G.MANGABEIRA | RTS 13,8 kV 5 Mvar G.MANGABEIRA RT1 BA | RBF | FT TR 230/69 kV G.MANGABEIRA TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | G.MANGABEIRA | RTS 13,8 kV 5 Mvar G.MANGABEIRA RT1 BA | RBF | FT TR 230/69 kV G.MANGABEIRA TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$351,841.75 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | G.MANGABEIRA | RTS 13,8 kV 5 Mvar G.MANGABEIRA RT1 BA | RBF | FT TR 230/69 kV G.MANGABEIRA TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$324,355.11 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | G.MANGABEIRA | MG 230 kV G.MANGABEIRA MG1 BA | RB | FT MG 230 kV G.MANGABEIRA MG1 BA | 061/2001 | IPCA | RBNI | REA 2823/2011 | 5/18/2015 | 9/26/2045 | R$236,760.54 | 6/1/2025 | Ativa | T2009-122 | Complemento, na SE Governador Mangabeira, de infraestrutura de módulo geral pela instalação do transformador trifásico 230/69 kV, de 100 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | G.MANGABEIRA | MG 230 kV G.MANGABEIRA MG1 BA | RB | FT MG 230 kV G.MANGABEIRA MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$593,294.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | G.MANGABEIRA | MG 230 kV G.MANGABEIRA MG1 BA | RB | FT MG 230 kV G.MANGABEIRA MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 3/30/2014 | 3/29/2042 | R$59,665.35 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SISTEMAS AUTOMÁTICOS DE REGULAÇÃO ASSOCIADOS A TRANSFORMADORES Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | G.MANGABEIRA | MG 230 kV G.MANGABEIRA MG1 BA | RB | FT MG 230 kV G.MANGABEIRA MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,664,885.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | G.MANGABEIRA | MG 230 kV G.MANGABEIRA MG1 BA | RB | FT MG 230 kV G.MANGABEIRA MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,534,821.36 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | G.MANGABEIRA | MG 230 kV G.MANGABEIRA MG1 BA | RB | FT MG 230 kV G.MANGABEIRA MG1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 2/15/2016 | 2/17/2046 | R$ 216.97 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | G.MANGABEIRA | MG 230 kV G.MANGABEIRA MG1 BA | RB | FT MG 230 kV G.MANGABEIRA MG1 BA | 061/2001 | IPCA | RBNI | REA 7761/2019 | 7/28/2020 | 1/24/2038 | R$71,698.84 | 6/1/2025 | Ativa | Implantação de Sistema para acesso remoto a dispositivos de Proteção, Controle e Automação. Sistema composto de Painel com PCs Industriais (Concentrador e Firewall), Receptor GPS, Switch Gerenciável. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | G.MANGABEIRA | MG 230 kV G.MANGABEIRA MG1 BA | RB | FT MG 230 kV G.MANGABEIRA MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/23/2020 | 5/14/2041 | R$603,263.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | G.MANGABEIRA | MC 69 kV TT 69/13,8 kV G.MANGABEIRA TA1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | G.MANGABEIRA | MC 69 kV TT 69/0 kV G.MANGABEIRA TA2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | G.MANGABEIRA | MC 69 kV TR 230/69 kV G.MANGABEIRA TR2 BA | RBF | FT TR 230/69 kV G.MANGABEIRA TR2 BA | 061/2001 | IPCA | RBNI | REA 2823/2011 | 5/18/2015 | 7/1/2047 | R$386,440.73 | 6/1/2025 | Ativa | T2009-122 | Instalar, na SE Governador Mangabeira, um módulo de conexão 69 kV, arranjo barra principal e transferência, para o transformador trifásico 230/69 kV, de 100 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | G.MANGABEIRA | MC 69 kV TR 230/69 kV G.MANGABEIRA TR1 BA | RBF | FT TR 230/69 kV G.MANGABEIRA TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | G.MANGABEIRA | MC 69 kV TR 230/69 kV G.MANGABEIRA TR1 BA | RBF | FT TR 230/69 kV G.MANGABEIRA TR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/28/2020 | 1/23/2052 | R$75,385.00 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | G.MANGABEIRA | MC 230 kV TR 230/69 kV G.MANGABEIRA TR2 BA | RBF | FT TR 230/69 kV G.MANGABEIRA TR2 BA | 061/2001 | IPCA | RBNI | REA 2823/2011 | 5/18/2015 | 8/29/2047 | R$929,858.85 | 6/1/2025 | Ativa | T2009-122 | Instalar, na SE Governador Mangabeira, um módulo de conexão 230 kV, arranjo barra principal e transferência, para o transformador trifásico 230/69 kV, de 100 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | G.MANGABEIRA | MC 230 kV TR 230/69 kV G.MANGABEIRA TR1 BA | RBF | FT TR 230/69 kV G.MANGABEIRA TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | G.MANGABEIRA | MC 230 kV TR 230/69 kV G.MANGABEIRA TR1 BA | RBF | FT TR 230/69 kV G.MANGABEIRA TR1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 6/19/2016 | 6/22/2046 | R$14,409.66 | 6/1/2025 | Ativa | Substituir TC ATOFII230TIPO1 com desgaste prematuro. Posição Operacional: 94T1-A/. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | G.MANGABEIRA | MC 230 kV TR 230/69 kV G.MANGABEIRA TR1 BA | RBF | FT TR 230/69 kV G.MANGABEIRA TR1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 6/19/2016 | 6/22/2046 | R$14,409.66 | 6/1/2025 | Ativa | Substituir TC ATOFII230TIPO1 com desgaste prematuro. Posição Operacional: 94T1-B/. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | G.MANGABEIRA | MC 230 kV TR 230/69 kV G.MANGABEIRA TR1 BA | RBF | FT TR 230/69 kV G.MANGABEIRA TR1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 6/19/2016 | 6/22/2046 | R$14,409.66 | 6/1/2025 | Ativa | Substituir TC ATOFII230TIPO1 com desgaste prematuro. Posição Operacional: 94T1-C/. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | G.MANGABEIRA | MC 13,8 kV TR 230/69 kV G.MANGABEIRA TR1 BA MC2 | RBF | FT TR 230/69 kV G.MANGABEIRA TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | G.MANGABEIRA | MC 13,8 kV TR 230/69 kV G.MANGABEIRA TR1 BA MC1 | RBF | FT TR 230/69 kV G.MANGABEIRA TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | G.MANGABEIRA | IB 69 kV MG 230 kV G.MANGABEIRA MG1 BA IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | G.MANGABEIRA | IB 230 kV MG 230 kV G.MANGABEIRA MG1 BA IB1 | RB | FT MG 230 kV G.MANGABEIRA MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,837.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 69 kV G.MANGABEIRA DIST6 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 69 kV G.MANGABEIRA DIST6 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 7/7/2016 | 7/10/2046 | R$1,483.24 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 69 kV G.MANGABEIRA DIST6 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/23/2020 | 12/26/2048 | R$40,137.05 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 69 kV G.MANGABEIRA DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 69 kV G.MANGABEIRA DIST5 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/23/2020 | 12/26/2048 | R$40,135.18 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 69 kV G.MANGABEIRA DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 69 kV G.MANGABEIRA DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 69 kV G.MANGABEIRA DIST3 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 7/7/2016 | 7/10/2046 | R$1,483.25 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 69 kV G.MANGABEIRA DIST3 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/22/2022 | 4/21/2046 | R$8,087.16 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 69 kV G.MANGABEIRA DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 69 kV G.MANGABEIRA DIST2 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 7/7/2016 | 7/10/2046 | R$1,483.25 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 69 kV G.MANGABEIRA DIST2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/1/2019 | 10/3/2049 | R$21,367.08 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 69 kV G.MANGABEIRA DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 69 kV G.MANGABEIRA DIST1 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 7/7/2016 | 7/10/2046 | R$ 213.96 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 69 kV G.MANGABEIRA DIST1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/4/2018 | 1/7/2048 | R$30,407.82 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 230 kV G.MANGABEIRA LT 230 kV TOMBA /G.MANGABEIRA C-2 BA | RB | FT LT 230 kV TOMBA /G.MANGABEIRA C-2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 230 kV G.MANGABEIRA LT 230 kV TOMBA /G.MANGABEIRA C-2 BA | RB | FT LT 230 kV TOMBA /G.MANGABEIRA C-2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/2/2014 | 2/16/2029 | R$90,681.06 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 230 kV G.MANGABEIRA LT 230 kV TOMBA /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV TOMBA /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 230 kV G.MANGABEIRA LT 230 kV TOMBA /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV TOMBA /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/30/2021 | 11/26/2049 | R$91,233.32 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 230 kV G.MANGABEIRA LT 230 kV TOMBA /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV TOMBA /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RBNI | REA 7761/2019 | 7/26/2015 | 3/8/2033 | R$34,615.20 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE SISTEMAS DE PROTEÇÃO E PAINÉIS ASSOCIADOS EM 01 TERMINAL DE LINHA DE TRANSMISSÃO LT 04S1. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 230 kV G.MANGABEIRA LT 230 kV P.DO CAVALO /G.MANGABEIRA C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 230 kV G.MANGABEIRA LT 230 kV P.DO CAVALO /G.MANGABEIRA C-1 BA | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 2/28/2016 | 3/2/2046 | R$4,635.48 | 6/1/2025 | Ativa | Substituir TPC UHC245 com vida regulatória esgotada. Posição Operacional: 84S1-B/. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 230 kV G.MANGABEIRA LT 230 kV P.DO CAVALO /G.MANGABEIRA C-1 BA | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 2/28/2016 | 3/2/2046 | R$4,635.48 | 6/1/2025 | Ativa | Substituir TPC UHC245 com vida regulatória esgotada. Posição Operacional: 84S1-C/. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 230 kV G.MANGABEIRA LT 230 kV P.DO CAVALO /G.MANGABEIRA C-1 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2021 | 12/31/2048 | R$2,763.67 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA | RB | FT LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA | RB | FT LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/9/2021 | 6/12/2051 | R$122,059.98 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA | RB | FT LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA | RB | FT LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$596,907.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA | RB | FT LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2021 | 12/31/2048 | R$4,859.18 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA | RB | FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA | RB | FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$596,907.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA | RB | FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 3/18/2016 | 3/17/2049 | R$100,252.90 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de Disjuntor, MAGRINE 245MHM2EV * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA | RB | FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/23/2020 | 11/26/2050 | R$62,659.41 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 230 kV G.MANGABEIRA LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RBNI | REA 2891/2011 | 11/30/2015 | 1/4/2048 | R$ 1,073,661.35 | 6/1/2025 | Ativa | T2009-193 | Instalar um módulo de entrada de linha 230 kV, arranjo BPT, para separar o segundo circuito da LT 230 kV Camaçari II - Governador Mangabeira. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 230 kV G.MANGABEIRA LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 7/15/2016 | 7/18/2046 | R$14,308.94 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 230 kV G.MANGABEIRA LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/22/2021 | 7/19/2049 | R$90,278.52 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 230 kV G.MANGABEIRA LT 230 kV CATU /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV CATU /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RBNI | REA 2891/2011 | 11/30/2015 | 1/4/2048 | R$ 1,073,661.35 | 6/1/2025 | Ativa | T2009-193 | Instalar um módulo de entrada de linha 230 kV, arranjo BPT, para separar o segundo circuito da LT 230 kV Camaçari II - Governador Mangabeira - Tomba. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 230 kV G.MANGABEIRA LT 230 kV CATU /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV CATU /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2021 | 12/31/2035 | R$30,991.69 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | G.MANGABEIRA | EL 230 kV G.MANGABEIRA LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GARANHUNS II | RTL 500 kV 50 Mvar GARANHUNS II RTR1 PE | RB | FT RTL 500 kV 50 Mvar GARANHUNS II RTR1 PE | 061/2001 | IPCA | RBNI | REA 10140/2021 | 11/18/2015 | 12/31/2042 | R$42,514.50 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 01 reator monofásicos reserva, de 500 kV, de 50 Mvar, na subestação Garanhuns, associados a LT 500kV Luis Gonzaga – Garanhuns C1. Módulo transferido da IEGaranhuns para a Chesf no seccionamento da LT 500kV Luiz Gonzaga-Angelim II. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | GARANHUNS II | RTL 500 kV 150 Mvar GARANHUNS II RT1 PE | RB | FT RTL 500 kV 150 Mvar GARANHUNS II RT1 PE | 061/2001 | IPCA | RBNI | REA 10140/2021 | 11/18/2015 | 12/31/2042 | R$127,543.49 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 04 reatores de linha monofásicos, de 500 kV, de 50 Mvar, na subestação Garanhuns, associados a LT 500kV Luis Gonzaga – Garanhuns C1. Módulo transferido da IEGaranhuns para a Chesf no seccionamento da LT 500kV Luiz Gonzaga-Angelim II. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | GARANHUNS II | MG 500 kV GARANHUNS II MG2 PE | RB | FT MG 500 kV GARANHUNS II MG2 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/11/2021 | 6/3/2043 | R$30,212.46 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | GARANHUNS II | MC 500 kV RTL 500 kV 150 Mvar GARANHUNS II RT1 PE | RB | FT RTL 500 kV 150 Mvar GARANHUNS II RT1 PE | 061/2001 | IPCA | RBNI | REA 10140/2021 | 11/18/2015 | 12/31/2042 | R$47,025.47 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 01 (um) Módulo de conexão de reator de linha, de 500 kV, manobrável por disjuntor, na subestação Garanhuns.Módulo transferido da IEGaranhuns para a Chesf no seccionamento da LT 500kV Luiz Gonzaga-Angelim II. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | GARANHUNS II | EL 500 kV GARANHUNS II LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE | RB | FT LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE | 061/2001 | IPCA | RBNI | REA 10140/2021 | 11/18/2015 | 12/31/2042 | R$100,678.42 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 2 módulos de entrada de linha em 500 kV, arranjo disjuntor e meio, na subestação Garanhuns, associados ao seccionamento da LT 500kV Luis Gonzaga – Angelim II C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | GARANHUNS II | EL 500 kV GARANHUNS II LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE | RB | FT LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/8/2022 | 2/16/2049 | R$115,626.29 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | GARANHUNS II | EL 500 kV GARANHUNS II LT 500 kV GARANHUNS II /ANGELIM II C-1 PE | RB | FT LT 500 kV GARANHUNS II /ANGELIM II C-1 PE | 061/2001 | IPCA | RBNI | REA 10140/2021 | 11/18/2015 | 12/31/2042 | R$100,678.42 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 2 módulos de entrada de linha em 500 kV, arranjo disjuntor e meio, na subestação Garanhuns, associados ao seccionamento da LT 500kV Luis Gonzaga – Angelim II C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | GARANHUNS II | EL 500 kV GARANHUNS II LT 500 kV GARANHUNS II /ANGELIM II C-1 PE | RB | FT LT 500 kV GARANHUNS II /ANGELIM II C-1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/23/2022 | 12/25/2052 | R$103,511.38 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | GARANHUNS II | EL 230 kV GARANHUNS II LT 230 kV P.AFONSO III /GARANHUNS II C-3 AL/PE | RB | FT LT 230 kV P.AFONSO III /GARANHUNS II C-3 AL/PE | 061/2001 | IPCA | RBNI | REA 10140/2021 | 11/18/2015 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 5 módulos de entrada de linha em 230 kV, arranjo BD4, na subestação Garanhuns 230 kV, associadas aos seccionamentos das LTs 230kV Paulo Afonso – Angelim, C2 / C3 / C4. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | GARANHUNS II | EL 230 kV GARANHUNS II LT 230 kV P.AFONSO III /GARANHUNS II C-2 AL/PE | RB | FT LT 230 kV P.AFONSO III /GARANHUNS II C-2 AL/PE | 061/2001 | IPCA | RBNI | REA 10140/2021 | 11/18/2015 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 5 módulos de entrada de linha em 230 kV, arranjo BD4, na subestação Garanhuns 230 kV, associadas aos seccionamentos das LTs 230kV Paulo Afonso – Angelim, C2 / C3 / C4. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | GARANHUNS II | EL 230 kV GARANHUNS II LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE | RB | FT LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE | 061/2001 | IPCA | RBNI | REA 10140/2021 | 11/18/2015 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 5 módulos de entrada de linha em 230 kV, arranjo BD4, na subestação Garanhuns 230 kV, associadas aos seccionamentos das LTs 230kV Paulo Afonso – Angelim, C2 / C3 / C4. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | GARANHUNS II | EL 230 kV GARANHUNS II LT 230 kV GARANHUNS II /ANGELIM C-3 PE | RB | FT LT 230 kV GARANHUNS II /ANGELIM C-3 PE | 061/2001 | IPCA | RBNI | REA 10140/2021 | 11/18/2015 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 5 módulos de entrada de linha em 230 kV, arranjo BD4, na subestação Garanhuns 230 kV, associadas aos seccionamentos das LTs 230kV Paulo Afonso – Angelim, C3. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | GARANHUNS II | EL 230 kV GARANHUNS II LT 230 kV GARANHUNS II /ANGELIM C-2 PE C1/C2 | RB | FT LT 230 kV GARANHUNS II /ANGELIM C-2 PE | 061/2001 | IPCA | RBNI | REA 10140/2021 | 11/18/2015 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 5 módulos de entrada de linha em 230 kV, arranjo BD4, na subestação Garanhuns 230 kV, associadas aos seccionamentos das LTs 230kV Paulo Afonso – Angelim, C2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GARIBALDI 1 | EL 230 kV GARIBALDI 1 LT 230 kV VINHEDOS /GARIBALDI 1 C-1 RS | RB | FT LT 230 kV VINHEDOS /GARIBALDI 1 C-1 RS | 012/2010 | IPCA | RBL | CC 012/2010 | 7/19/2013 | 10/6/2040 | R$826,978.93 | 6/1/2025 | Ativa | T2010-079 | Contrato de Concessão nº 012/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Sul | GASPAR 2 | MG 525 kV GASPAR 2 MG2 SC | RB | FT MG 525 kV GASPAR 2 MG2 SC | 010/2005 | IGPM | RBNI | DSP 543/2025 | 12/30/2024 | 12/29/2042 | R$86,183.77 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo Geral de Acessante 500 kV na SE Gaspar 2, associado as Entradas de Linha 500 kV para as SEs Biguaçu e Blumenau, em função do seccionamento da LT 500 kV Biguaçu -Blumenau na Subestação seccionadora Gaspar 2. | |||
| AXIA Energia Sul | GASPAR 2 | MG 230 kV GASPAR 2 MG2 SC | RB | FT MG 230 kV GASPAR 2 MG2 SC | 057/2001 | IPCA | RBNI | REA 4802/2014 | 9/30/2016 | 7/13/2044 | R$521,439.90 | 6/1/2025 | Ativa | T2014-058 | Complementação do módulo geral da Subestação Gaspar II com dois módulos de infraestrutura de manobra em 230 kV. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | GASPAR 2 | MG 230 kV GASPAR 2 MG2 SC | RB | FT MG 230 kV GASPAR 2 MG2 SC | 057/2001 | IPCA | RBNI | DSP 540/2025 | 12/30/2024 | 12/29/2042 | R$74,620.53 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura Geral de Acessante -MIG-A 500 kV na SE Gaspar 2, em função do seccionamento da LT 500 kV Curitiba - Blumenau C1. | |||
| AXIA Energia Sul | GASPAR 2 | EL 500 kV GASPAR 2 LT 500 kV GASPAR 2 /CURITIBA C-1 SC/PR | RB | FT LT 500 kV GASPAR 2 /CURITIBA C-1 SC/PR | 057/2001 | IPCA | RBNI | DSP 540/2025 | 12/30/2024 | 12/29/2052 | R$263,458.82 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV, arranjo Disjuntor e Meio, na subestação Gaspar 2, associada à Linha de Transmissão 500 kV Curitiba – Gaspar 2 C1. | |||
| AXIA Energia Sul | GASPAR 2 | EL 500 kV GASPAR 2 LT 500 kV GASPAR 2 /BLUMENAU C-2 SC | RB | FT LT 500 kV GASPAR 2 /BLUMENAU C-2 SC | 057/2001 | IPCA | RBNI | DSP 540/2025 | 12/30/2024 | 12/29/2052 | R$263,458.82 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV, arranjo Disjuntor e Meio, na subestação Gaspar 2, associada à Linha de Transmissão 500 kV Gaspar 2 – Blumenau C2. | |||
| AXIA Energia Sul | GASPAR 2 | EL 500 kV GASPAR 2 LT 500 kV GASPAR 2 /BLUMENAU C-1 SC | RB | FT LT 500 kV GASPAR 2 /BLUMENAU C-1 SC | 010/2005 | IGPM | RBNI | DSP 543/2025 | 12/30/2024 | 12/29/2052 | R$304,284.55 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV,arranjo Disjuntor e Meio, na Subestação Gaspar 2, associada à Linha de Transmissão 500 kV Gaspar 2 –Blumenau C1. | |||
| AXIA Energia Sul | GASPAR 2 | EL 500 kV GASPAR 2 LT 500 kV BIGUACU /GASPAR 2 C-1 SC | RB | FT LT 500 kV BIGUACU /GASPAR 2 C-1 SC | 010/2005 | IGPM | RBNI | DSP 543/2025 | 12/30/2024 | 12/29/2052 | R$304,284.55 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV, arranjo Disjuntor e Meio, na Subestação Gaspar 2, associada à Linha de Transmissão 500 kV Biguaçu – Gaspar 2 C1. | |||
| AXIA Energia Sul | GASPAR 2 | EL 230 kV GASPAR 2 LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC | RB | FT LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC | 057/2001 | IPCA | RBNI | REA 4802/2014 | 9/30/2016 | 9/29/2046 | R$ 1,107,457.73 | 6/1/2025 | Ativa | T2014-058 | Instalar, na SE GASPAR 2, um módulo de entrada de linha, arranjo barra dupla a quatro chaves, para o circuito LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC originado do seccionamento do circuito LT 230 kV BLUMENAU /PALHOCA ESU C-1 SC na SE GASPAR 2. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | GASPAR 2 | EL 230 kV GASPAR 2 LT 230 kV GASPAR 2 /BLUMENAU C-2 SC | RB | FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC | 057/2001 | IPCA | RBNI | REA 4802/2014 | 9/30/2016 | 9/29/2046 | R$ 1,107,457.73 | 6/1/2025 | Ativa | T2014-058 | Instalar, na SE GASPAR 2, um módulo de entrada de linha, arranjo barra dupla a quatro chaves, para o circuito LT 230 kV GASPAR 2 /BLUMENAU C-1 SC originado do seccionamento do circuito LT 230 kV BLUMENAU /PALHOCA ESU C-1 SC na SE GASPAR 2. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | GASPAR 2 | EL 230 kV GASPAR 2 LT 230 kV GASPAR 2 /BLUMENAU C-1 SC | RB | FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC | 057/2001 | IPCA | RBNI | REA 7009/2018 | 1/22/2016 | 12/31/2042 | R$56,177.01 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla quatro chaves, na subestação Gaspar 2, associada à linha de transmissão Blumenau - Gaspar 2 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GASPAR 2 | EL 230 kV GASPAR 2 LT 230 kV BIGUACU /GASPAR 2 C-1 SC | RB | FT LT 230 kV BIGUACU /GASPAR 2 C-1 SC | 057/2001 | IPCA | RBNI | REA 7009/2018 | 1/22/2016 | 12/31/2042 | R$56,177.01 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla quatro chaves, na subestação Gaspar 2, associada à linha de transmissão Biguaçu - Gaspar 2 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | GOIANINHA | TT 69/0 kV GOIANINHA TA2 PE | DIT | 061/2001 | IPCA | RCDM | REA 2412/2010 | 8/14/2012 | 12/27/2042 | R$236,861.12 | 6/1/2025 | Ativa | T2010-005 | Instalar o 2º transformador de aterramento 69 kV - 20 ohms/fase. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | GOIANINHA | TT 69/0 kV GOIANINHA TA1 PE | DIT | 061/2001 | IPCA | RCDM | REA 5931/2016 | 12/17/2017 | 8/14/2048 | R$173,582.97 | 6/1/2025 | Ativa | T2016-007 | Obra de Substituição Completa - Substituir o Transformador de aterramento 40 ohm/fase por um de 20 ohm/fase. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | GOIANINHA | TR 230/69 kV GOIANINHA TR4 PE | RBF | FT TR 230/69 kV GOIANINHA TR4 PE | 061/2001 | IPCA | RBNI | REA 5931/2016 | 4/15/2018 | 8/3/2052 | R$ 2,030,412.32 | 6/1/2025 | Ativa | T2016-007 | Instalar o 4º Transformador trifásico 230/69 kV - 100 MVA com comutador. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | GOIANINHA | TR 230/69 kV GOIANINHA TR3 PE | RBF | FT TR 230/69 kV GOIANINHA TR3 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | TR 230/69 kV GOIANINHA TR2 PE | RBF | FT TR 230/69 kV GOIANINHA TR2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | TR 230/69 kV GOIANINHA TR2 PE | RBF | FT TR 230/69 kV GOIANINHA TR2 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | TR 230/69 kV GOIANINHA TR2 PE | RBF | FT TR 230/69 kV GOIANINHA TR2 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/14/2021 | 7/22/2056 | R$111,683.72 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | GOIANINHA | TR 230/69 kV GOIANINHA TR1 PE | RBF | FT TR 230/69 kV GOIANINHA TR1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | TR 230/69 kV GOIANINHA TR1 PE | RBF | FT TR 230/69 kV GOIANINHA TR1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | TR 230/69 kV GOIANINHA TR1 PE | RBF | FT TR 230/69 kV GOIANINHA TR1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/13/2021 | 7/21/2056 | R$97,721.22 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | GOIANINHA | RTS 13,8 kV 5 Mvar GOIANINHA RT2 PE | RBF | FT TR 230/69 kV GOIANINHA TR2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | RTS 13,8 kV 5 Mvar GOIANINHA RT1 PE | RBF | FT TR 230/69 kV GOIANINHA TR1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | RTB 230 kV 10 Mvar GOIANINHA RT1 PE | RB | FT RTB 230 kV 10 MVAr GOIANINHA RT1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$192,025.69 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | RTB 230 kV 10 Mvar GOIANINHA RT1 PE | RB | FT RTB 230 kV 10 MVAr GOIANINHA RT1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/20/2019 | 12/30/2054 | R$3,693.67 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | GOIANINHA | MG 230 kV GOIANINHA MG1 PE | RB | FT MG 230 kV GOIANINHA MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$653,680.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | MG 230 kV GOIANINHA MG1 PE | RB | FT MG 230 kV GOIANINHA MG1 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/30/2013 | 9/29/2030 | R$2,187.57 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCOS DE BATERIAS -48Vcc. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | GOIANINHA | MG 230 kV GOIANINHA MG1 PE | RB | FT MG 230 kV GOIANINHA MG1 PE | 061/2001 | IPCA | RBNI | REA 5931/2016 | 4/15/2018 | 3/8/2047 | R$208,914.06 | 6/1/2025 | Ativa | T2016-007 | Instalar de um módulo de infraestrutura de manobra 230 kV, para módulo de conexão 230 kV arranjo barra principal e de transferência do 4º Trafo 230/69 kV. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | GOIANINHA | MG 230 kV GOIANINHA MG1 PE | RB | FT MG 230 kV GOIANINHA MG1 PE | 061/2001 | IPCA | RBNI | REA 5931/2016 | 4/15/2018 | 5/1/2046 | R$60,242.95 | 6/1/2025 | Ativa | T2016-007 | Instalar de um módulo de infraestrutura de manobra 69 kV, para módulo de conexão 69 kV arranjo barra principal e de transferência do 4º Trafo 230/69 kV. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | GOIANINHA | MG 230 kV GOIANINHA MG1 PE | RB | FT MG 230 kV GOIANINHA MG1 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/28/2015 | 9/30/2045 | R$6,023.81 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32BA-1 e 32bp-1.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | GOIANINHA | MG 230 kV GOIANINHA MG1 PE | RB | FT MG 230 kV GOIANINHA MG1 PE | 061/2001 | IPCA | RBNI | REA 5931/2016 | 4/15/2018 | 4/14/2035 | R$34,404.06 | 6/1/2025 | Ativa | T2016-007 | Instalar banco de bateria, retificador e quadro de baixa tensão, ocasionada pela implantação do 4º transformador 230/69 kV. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | GOIANINHA | MG 230 kV GOIANINHA MG1 PE | RB | FT MG 230 kV GOIANINHA MG1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,834,336.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | MG 230 kV GOIANINHA MG1 PE | RB | FT MG 230 kV GOIANINHA MG1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,691,034.20 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | MG 230 kV GOIANINHA MG1 PE | RB | FT MG 230 kV GOIANINHA MG1 PE | 061/2001 | IPCA | RMEL | REN 443/2011 | 8/30/2016 | 8/29/2033 | R$8,084.78 | 6/1/2025 | Ativa | Implantação de Banco de Baterias * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | GOIANINHA | MG 230 kV GOIANINHA MG1 PE | RB | FT MG 230 kV GOIANINHA MG1 PE | 061/2001 | IPCA | RBNI | REN 905/2020 | 3/11/2019 | 3/27/2047 | R$61,480.57 | 6/1/2025 | Ativa | MIM ASSOCIADO A Implantação de 1 (uma) Entrada de Linha -EL em 69 kV na SE Goianinha com destino a Condado * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | GOIANINHA | MG 230 kV GOIANINHA MG1 PE | RB | FT MG 230 kV GOIANINHA MG1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/13/2021 | 6/16/2039 | R$397,305.99 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | GOIANINHA | MC 69 kV TT 69/0 kV GOIANINHA TA2 PE | DIT | 061/2001 | IPCA | RCDM | REA 2412/2010 | 8/14/2012 | 8/24/2046 | R$232,738.16 | 6/1/2025 | Ativa | T2010-005 | Instalar um módulo de conexão do 2º transformador de aterramento 69 kV, constituído por uma chave seccionadora. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | GOIANINHA | MC 69 kV TT 69/0 kV GOIANINHA TA1 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | GOIANINHA | MC 69 kV TT 69/0 kV GOIANINHA TA1 PE | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/1/2014 | 1/10/2036 | R$26,165.00 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | GOIANINHA | MC 69 kV TR 230/69 kV GOIANINHA TR4 PE | RBF | FT TR 230/69 kV GOIANINHA TR4 PE | 061/2001 | IPCA | RBNI | REA 5931/2016 | 4/15/2018 | 8/10/2047 | R$533,629.50 | 6/1/2025 | Ativa | T2016-007 | Instalar de um módulo de conexão de transformador 69 kV, arranjo barra principal e de transferencia. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | GOIANINHA | MC 69 kV TR 230/69 kV GOIANINHA TR3 PE | RBF | FT TR 230/69 kV GOIANINHA TR3 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | MC 69 kV TR 230/69 kV GOIANINHA TR2 PE | RBF | FT TR 230/69 kV GOIANINHA TR2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | MC 69 kV TR 230/69 kV GOIANINHA TR2 PE | RBF | FT TR 230/69 kV GOIANINHA TR2 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | MC 69 kV TR 230/69 kV GOIANINHA TR2 PE | RBF | FT TR 230/69 kV GOIANINHA TR2 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$162,185.50 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | MC 69 kV TR 230/69 kV GOIANINHA TR2 PE | RBF | FT TR 230/69 kV GOIANINHA TR2 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/22/2021 | 1/24/2050 | R$41,441.71 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | GOIANINHA | MC 69 kV TR 230/69 kV GOIANINHA TR1 PE | RBF | FT TR 230/69 kV GOIANINHA TR1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | MC 69 kV TR 230/69 kV GOIANINHA TR1 PE | RBF | FT TR 230/69 kV GOIANINHA TR1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/11/2015 | 1/10/2039 | R$6,149.32 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | GOIANINHA | MC 69 kV BC 69 kV 21,3 Mvar GOIANINHA BC1 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | GOIANINHA | MC 69 kV BC 69 kV 21,3 Mvar GOIANINHA BC1 PE | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 6/30/2014 | 7/27/2047 | R$35,016.89 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DO DISJUNTOR 12H1 POR SIEMENS 3AR1 Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | GOIANINHA | MC 69 kV BC 69 kV 21,3 Mvar GOIANINHA BC1 PE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | GOIANINHA | MC 230 kV TR 230/69 kV GOIANINHA TR4 PE | RBF | FT TR 230/69 kV GOIANINHA TR4 PE | 061/2001 | IPCA | RBNI | REA 5931/2016 | 4/15/2018 | 9/24/2046 | R$ 1,425,770.01 | 6/1/2025 | Ativa | T2016-007 | Instalar de um módulo de conexão de transformador 230 kV, arranjo barra principal e de transferencia. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | GOIANINHA | MC 230 kV TR 230/69 kV GOIANINHA TR3 PE | RBF | FT TR 230/69 kV GOIANINHA TR3 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | MC 230 kV TR 230/69 kV GOIANINHA TR3 PE | RBF | FT TR 230/69 kV GOIANINHA TR3 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/5/2020 | 1/7/2050 | R$2,964.17 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | GOIANINHA | MC 230 kV TR 230/69 kV GOIANINHA TR2 PE | RBF | FT TR 230/69 kV GOIANINHA TR2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | MC 230 kV TR 230/69 kV GOIANINHA TR1 PE | RBF | FT TR 230/69 kV GOIANINHA TR1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | MC 230 kV TR 230/69 kV GOIANINHA TR1 PE | RBF | FT TR 230/69 kV GOIANINHA TR1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/18/2017 | 4/23/2048 | R$237,260.17 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | GOIANINHA | MC 230 kV RTB 230 kV 10 Mvar GOIANINHA RT1 PE | RB | FT RTB 230 kV 10 MVAr GOIANINHA RT1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$140,466.92 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | MC 230 kV RTB 230 kV 10 Mvar GOIANINHA RT1 PE | RB | FT RTB 230 kV 10 MVAr GOIANINHA RT1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$394,173.90 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | MC 230 kV RTB 230 kV 10 Mvar GOIANINHA RT1 PE | RB | FT RTB 230 kV 10 MVAr GOIANINHA RT1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/14/2021 | 4/13/2045 | R$25,138.37 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | GOIANINHA | MC 13,8 kV TR 230/69 kV GOIANINHA TR2 PE | RBF | FT TR 230/69 kV GOIANINHA TR2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | MC 13,8 kV TR 230/69 kV GOIANINHA TR1 PE | RBF | FT TR 230/69 kV GOIANINHA TR1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | MC 13,8 kV RTS 13,8 kV 5 Mvar GOIANINHA RT2 PE | RBF | FT TR 230/69 kV GOIANINHA TR2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$37,390.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | MC 13,8 kV RTS 13,8 kV 5 Mvar GOIANINHA RT1 PE | RBF | FT TR 230/69 kV GOIANINHA TR1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$37,390.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | MC 13,8 kV CS 20/-9 Mvar GOIANINHA CS1 PE MC2 | RBF | FT CS 20/-9 MVAr GOIANINHA CS1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$60,394.36 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | MC 13,8 kV CS 20/-9 Mvar GOIANINHA CS1 PE MC1 | RBF | FT CS 20/-9 MVAr GOIANINHA CS1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$60,394.36 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | IB 69 kV MG 230 kV GOIANINHA MG1 PE IB3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$28,712.69 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | GOIANINHA | IB 69 kV MG 230 kV GOIANINHA MG1 PE IB2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$28,712.69 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | GOIANINHA | IB 69 kV MG 230 kV GOIANINHA MG1 PE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | GOIANINHA | IB 69 kV MG 230 kV GOIANINHA MG1 PE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$118,244.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | GOIANINHA | IB 230 kV MG 230 kV GOIANINHA MG1 PE IB1 | RB | FT MG 230 kV GOIANINHA MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,837.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | IB 230 kV MG 230 kV GOIANINHA MG1 PE IB1 | RB | FT MG 230 kV GOIANINHA MG1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$325,059.40 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | IB 230 kV MG 230 kV GOIANINHA MG1 PE IB1 | RB | FT MG 230 kV GOIANINHA MG1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$299,665.05 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | IB 13,8 kV MG 230 kV GOIANINHA MG1 PE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$24,984.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST9 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST9 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 3/18/2015 | 3/20/2045 | R$3,067.12 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32M2-7.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST9 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST9 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/14/2019 | 2/5/2038 | R$10,860.40 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST8 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST8 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 3/18/2015 | 3/20/2045 | R$3,067.12 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32M1-7.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST8 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST8 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/29/2020 | 7/21/2041 | R$18,529.84 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST7 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST7 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/29/2015 | 10/1/2045 | R$3,012.18 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J1-7.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST7 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST7 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/5/2020 | 4/17/2045 | R$27,911.85 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST6 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST6 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST6 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/2/2018 | 3/27/2043 | R$33,233.86 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST4 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 10/1/2015 | 10/3/2045 | R$2,988.22 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST4 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/10/2022 | 4/12/2052 | R$22,956.39 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST3 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/30/2015 | 10/2/2045 | R$3,012.45 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32M4-7.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST3 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/28/2019 | 5/25/2046 | R$17,747.43 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST2 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/30/2015 | 10/2/2045 | R$3,012.45 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32M3-7.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/20/2022 | 4/19/2046 | R$8,085.71 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST10 | DIT | 061/2001 | IPCA | RCDM | REN 905/2020 | 3/11/2019 | 4/30/2050 | R$543,391.80 | 6/1/2025 | Ativa | Implantação de 1 (uma) Entrada de Linha -EL em 69 kV na SE Goianinha com destino a Condado * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST1 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/12/2015 | 11/14/2045 | R$2,969.71 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J2-6.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST1 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/29/2015 | 10/1/2045 | R$3,012.18 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J2-6.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 69 kV GOIANINHA DIST1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/20/2020 | 10/24/2048 | R$39,925.76 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | GOIANINHA | EL 230 kV GOIANINHA LT 230 kV RECIFE II /GOIANINHA C-2 PE | RB | FT LT 230 kV RECIFE II /GOIANINHA C-2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | EL 230 kV GOIANINHA LT 230 kV RECIFE II /GOIANINHA C-2 PE | RB | FT LT 230 kV RECIFE II /GOIANINHA C-2 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/3/2020 | 9/2/2044 | R$368,329.51 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | GOIANINHA | EL 230 kV GOIANINHA LT 230 kV RECIFE II /GOIANINHA C-1 PE | RB | FT LT 230 kV RECIFE II /GOIANINHA C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | EL 230 kV GOIANINHA LT 230 kV RECIFE II /GOIANINHA C-1 PE | RB | FT LT 230 kV RECIFE II /GOIANINHA C-1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/1/2020 | 8/23/2045 | R$429,340.64 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | GOIANINHA | EL 230 kV GOIANINHA LT 230 kV PAU FERRO /GOIANINHA C-1 PE | RB | FT LT 230 kV PAU FERRO /GOIANINHA C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | EL 230 kV GOIANINHA LT 230 kV PAU FERRO /GOIANINHA C-1 PE | RB | FT LT 230 kV PAU FERRO /GOIANINHA C-1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/18/2018 | 12/3/2046 | R$299,790.46 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | GOIANINHA | EL 230 kV GOIANINHA LT 230 kV GOIANINHA /JOAO PESSOA II C-2 PE/PB | RB | FT LT 230 kV GOIANINHA /JOAO PESSOA II C-2 PE/PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | EL 230 kV GOIANINHA LT 230 kV GOIANINHA /JOAO PESSOA II C-2 PE/PB | RB | FT LT 230 kV GOIANINHA /JOAO PESSOA II C-2 PE/PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/14/2020 | 8/30/2040 | R$187,101.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | GOIANINHA | EL 230 kV GOIANINHA LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB | RB | FT LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | EL 230 kV GOIANINHA LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB | RB | FT LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$596,907.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | EL 230 kV GOIANINHA LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB | RB | FT LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/4/2021 | 12/17/2046 | R$185,865.56 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | GOIANINHA | EL 230 kV GOIANINHA LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | EL 230 kV GOIANINHA LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$596,907.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | EL 230 kV GOIANINHA LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RMEL | REN 443/2011 | 1/30/2016 | 2/1/2046 | R$12,525.07 | 6/1/2025 | Ativa | Substituído TPC TEM230H com desgaste prematuro. Posição Operacional: 84L3-B/GNN. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | GOIANINHA | EL 230 kV GOIANINHA LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RMEL | REN 443/2011 | 1/30/2016 | 2/1/2046 | R$12,525.07 | 6/1/2025 | Ativa | Substituído TPC TEM230H com desgaste prematuro. Posição Operacional: 84L3-C/GNN. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | GOIANINHA | EL 230 kV GOIANINHA LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RMEL | REN 443/2011 | 1/30/2016 | 2/1/2046 | R$12,525.07 | 6/1/2025 | Ativa | Substituído TPC TEM230H com desgaste prematuro. Posição Operacional: 84L3-A/GNN. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | GOIANINHA | EL 230 kV GOIANINHA LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/23/2022 | 10/22/2037 | R$71,083.24 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | GOIANINHA | CS 20/-9 Mvar GOIANINHA CS1 PE | RBF | FT CS 20/-9 MVAr GOIANINHA CS1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$767,380.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | GOIANINHA | BC 69 kV 21,3 Mvar GOIANINHA BC1 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$111,469.11 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | GOIANINHA | BC 69 kV 21,3 Mvar GOIANINHA BC1 PE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$312,801.15 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | GOIANINHA | BC 69 kV 21,3 Mvar GOIANINHA BC1 PE | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/20/2022 | 7/19/2042 | R$3,818.30 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | GRAJAU | TT 13,8/0,12 kV GRAJAU TR58 RJ | RBF | FT TR 500/138 kV GRAJAU TR58 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GRAJAU | TT 13,8/0,12 kV GRAJAU TR56 RJ | RBF | FT TR 500/138 kV GRAJAU TR56 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GRAJAU | TR 500/138 kV GRAJAU TRR2 RJ | RBF | FT TR 500/138 kV GRAJAU TRR2 RJ | 062/2001 | IPCA | RBNI | REA 3178/2011 | 11/14/2013 | 9/27/2044 | R$36,500.71 | 6/1/2025 | Ativa | T2011-145 | Instalação, na SE Grajaú, da segunda unidade autotransformadora de reserva 500/138 kV - 200 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | GRAJAU | TR 500/138 kV GRAJAU TR58 RJ | RBF | FT TR 500/138 kV GRAJAU TR58 RJ | 062/2001 | IPCA | RMEL | REA 5457/2015 | 11/2/2015 | 11/22/2048 | R$ 4,948,805.96 | 6/1/2025 | Ativa | T2014-036 | Obra de Substituição Completa - Substituir, na SE Grajaú, o banco de autotransformadores TR58 500/138 kV - 3x200 MVA, que possui valor remanescente de R$ 3.835.810,53 a preços de junho/2014, por outro banco de autotransformadores 500/138 kV - 3x200 MVA.(após a substituição, a receita vigente deve ser cancelada) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | GRAJAU | TR 500/138 kV GRAJAU TR56 RJ | RBF | FT TR 500/138 kV GRAJAU TR56 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,129,897.12 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GRAJAU | TR 500/138 kV GRAJAU TR56 RJ | RBF | FT TR 500/138 kV GRAJAU TR56 RJ | 062/2001 | IPCA | RMEL | REA 5457/2015 | 10/13/2015 | 10/12/2048 | R$ 1,647,252.24 | 6/1/2025 | Ativa | T2014-036 | Obra de Substituição Parcial - Substituir, na SE Grajaú, uma fase do banco de autotransformadores TR56 500/138 kV - 3x200 MVA, que possui valor remanescente de R$ 188.679,32 a preços de junho/2014, por outra fase de autotransformador 500/138 kV - 200 MVA. (após a substituição, a receita vigente deve ser cancelada) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | GRAJAU | TR 500/138 kV GRAJAU TR56 RJ | RBF | FT TR 500/138 kV GRAJAU TR56 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,335,841.45 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GRAJAU | TR 500/138 kV GRAJAU TR54 RJ | RBF | FT TR 500/138 kV GRAJAU TR54 RJ | 062/2001 | IPCA | RMEL | REA 5457/2015 | 12/20/2015 | 2/9/2049 | R$ 4,965,477.76 | 6/1/2025 | Ativa | T2014-036 | Obra de Substituição Completa - Substituir, na SE Grajaú, o banco de autotransformadores TR54 500/138 kV - 3x200 MVA, que possui valor remanescente nulo, por outro banco de autotransformadores 500/138 kV - 3x200 MVA. (após a substituição, a receita vigente deve ser cancelada) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | GRAJAU | TR 500/138 kV GRAJAU TR52 RJ | RBF | FT TR 500/138 kV GRAJAU TR52 RJ | 062/2001 | IPCA | RMEL | REA 5457/2015 | 9/15/2015 | 8/6/2048 | R$ 4,931,891.41 | 6/1/2025 | Ativa | T2014-036 | Obra de Substituição Completa - Substituir, na SE Grajaú, o banco de autotransformadores TR52 500/138 kV - 3x200 MVA, que possui valor remanescente nulo, por outro banco de autotransformadores 500/138 kV - 3x200 MVA. (após a substituição, a receita vigente deve ser cancelada) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | GRAJAU | MG 500 kV GRAJAU MG1 RJ | RB | FT MG 500 kV GRAJAU MG1 RJ | 062/2001 | IPCA | RBNI | REA 3178/2011 | 11/14/2013 | 10/7/2038 | R$338,211.42 | 6/1/2025 | Ativa | T2011-145 | Complementar o módulo de infraestrutura geral da SE Grajaú em razão da construção de 2º bacia de contenção para alocação de unidade transformadora falhada. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | GRAJAU | MG 500 kV GRAJAU MG1 RJ | RB | FT MG 500 kV GRAJAU MG1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,405,757.38 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GRAJAU | MG 500 kV GRAJAU MG1 RJ | RB | FT MG 500 kV GRAJAU MG1 RJ | 062/2001 | IPCA | RBNI | REA 4552/2014 | 2/26/2018 | 3/15/2047 | R$50,373.51 | 6/1/2025 | Ativa | T2014-012 | Complementação do módulo geral da subestação Grajaú com vinte e dois módulos de infraestrutura de manobra em 138 kV. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | GRAJAU | MG 500 kV GRAJAU MG1 RJ | RB | FT MG 500 kV GRAJAU MG1 RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/31/2017 | 3/24/2046 | R$2,862.00 | 6/1/2025 | Ativa | Substituição do Servidores e IHM do Sistema de Supervisão e Controle Local (SAGE) por obsolescência ou por atualização tecnológica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | MG 500 kV GRAJAU MG1 RJ | RB | FT MG 500 kV GRAJAU MG1 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 4/15/2018 | 4/14/2033 | R$820,793.63 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | GRAJAU | MC 500 kV TR 500/138 kV GRAJAU TR58 RJ | RBF | FT TR 500/138 kV GRAJAU TR58 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GRAJAU | MC 500 kV TR 500/138 kV GRAJAU TR58 RJ | RBF | FT TR 500/138 kV GRAJAU TR58 RJ | 062/2001 | IPCA | RBNI | REA 4347/2013 | 4/9/2018 | 4/8/2046 | R$13,808.89 | 6/1/2025 | Ativa | Substituição de RDP. No setor de 500 Kv * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | MC 500 kV TR 500/138 kV GRAJAU TR56 RJ | RBF | FT TR 500/138 kV GRAJAU TR56 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GRAJAU | MC 500 kV TR 500/138 kV GRAJAU TR56 RJ | RBF | FT TR 500/138 kV GRAJAU TR56 RJ | 062/2001 | IPCA | RBNI | REA 4347/2013 | 4/9/2018 | 4/8/2046 | R$13,808.89 | 6/1/2025 | Ativa | Substituição de RDP. No setor de 500 Kv * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | MC 500 kV TR 500/138 kV GRAJAU TR56 RJ | RBF | FT TR 500/138 kV GRAJAU TR56 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/30/2013 | 6/29/2037 | R$17,701.11 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | GRAJAU | MC 500 kV TR 500/138 kV GRAJAU TR54 RJ | RBF | FT TR 500/138 kV GRAJAU TR54 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GRAJAU | MC 500 kV TR 500/138 kV GRAJAU TR54 RJ | RBF | FT TR 500/138 kV GRAJAU TR54 RJ | 062/2001 | IPCA | RBNI | REA 4347/2013 | 4/9/2018 | 4/8/2046 | R$13,808.89 | 6/1/2025 | Ativa | Substituição de RDP. No setor de 500 Kv * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | MC 500 kV TR 500/138 kV GRAJAU TR52 RJ | RBF | FT TR 500/138 kV GRAJAU TR52 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GRAJAU | MC 500 kV TR 500/138 kV GRAJAU TR52 RJ | RBF | FT TR 500/138 kV GRAJAU TR52 RJ | 062/2001 | IPCA | RBNI | REA 4347/2013 | 4/9/2018 | 4/8/2046 | R$13,808.89 | 6/1/2025 | Ativa | Substituição de RDP. No setor de 500 Kv * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | MC 138 kV TR 500/138 kV GRAJAU TR58 RJ | RBF | FT TR 500/138 kV GRAJAU TR58 RJ | 062/2001 | IPCA | RBNI | REA 4552/2014 | 2/26/2018 | 2/25/2055 | R$ 2,120,534.82 | 6/1/2025 | Ativa | T2014-012 | Obra de Substituição Completa - Substituição de um módulo de conexão de transformador em 138 kV, arranjo barra dupla com disjuntor duplo, destinado à conexão com o banco de autotransformadores TR58 500/138 kV. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | GRAJAU | MC 138 kV TR 500/138 kV GRAJAU TR56 RJ | RBF | FT TR 500/138 kV GRAJAU TR56 RJ | 062/2001 | IPCA | RBNI | REA 4552/2014 | 2/26/2018 | 2/25/2055 | R$ 2,122,441.38 | 6/1/2025 | Ativa | T2014-012 | Obra de Substituição Completa - Substituição de um módulo de conexão de transformador em 138 kV, arranjo barra dupla com disjuntor duplo, destinado à conexão com o banco de autotransformadores TR56 500/138 kV. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | GRAJAU | MC 138 kV TR 500/138 kV GRAJAU TR54 RJ | RBF | FT TR 500/138 kV GRAJAU TR54 RJ | 062/2001 | IPCA | RBNI | REA 4552/2014 | 2/26/2018 | 2/25/2055 | R$ 2,120,526.16 | 6/1/2025 | Ativa | T2014-012 | Obra de Substituição Completa - Substituição de um módulo de conexão de transformador em 138 kV, arranjo barra dupla com disjuntor duplo, destinado à conexão com o banco de autotransformadores TR54 500/138 kV. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | GRAJAU | MC 138 kV TR 500/138 kV GRAJAU TR52 RJ | RBF | FT TR 500/138 kV GRAJAU TR52 RJ | 062/2001 | IPCA | RBNI | REA 4552/2014 | 2/26/2018 | 2/25/2055 | R$ 2,120,425.22 | 6/1/2025 | Ativa | T2014-012 | Obra de Substituição Completa - Substituição de um módulo de conexão de transformador em 138 kV, arranjo barra dupla com disjuntor duplo, destinado à conexão com o banco de autotransformadores TR52 500/138 kV. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | GRAJAU | MC 13,8 kV TT 13,8/0,12 kV GRAJAU TR58 RJ | RBF | FT TR 500/138 kV GRAJAU TR58 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GRAJAU | MC 13,8 kV TT 13,8/0,12 kV GRAJAU TR56 RJ | RBF | FT TR 500/138 kV GRAJAU TR56 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GRAJAU | MC 13,8 kV CS 200/-150 Mvar GRAJAU CS2 RJ | RBF | FT CS 200/-150 MVAr GRAJAU CS2 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$57,640.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GRAJAU | MC 13,8 kV CS 200/-150 Mvar GRAJAU CS1 RJ | RBF | FT CS 200/-150 MVAr GRAJAU CS1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$57,640.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GRAJAU | IB 500 kV MG 500 kV GRAJAU MG1 RJ IB1 | RB | FT MG 500 kV GRAJAU MG1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GRAJAU | IB 138 kV MG 500 kV GRAJAU MG1 RJ IB2 | DIT | 062/2001 | IPCA | RCDM | REA 4552/2014 | 2/26/2018 | 7/28/2056 | R$ 1,099,533.89 | 6/1/2025 | Ativa | T2014-012 | Obra de Substituição Completa - Substituição de um módulo de interligação de barras IB2 138 kV, arranjo barra dupla a três chaves. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | IB 138 kV MG 500 kV GRAJAU MG1 RJ IB1 | DIT | 062/2001 | IPCA | RCDM | REA 4552/2014 | 2/26/2018 | 2/25/2057 | R$ 1,056,734.01 | 6/1/2025 | Ativa | T2014-012 | Obra de Substituição Completa - Substituição de um módulo de interligação de barras IB1 138 kV, arranjo barra dupla a três chaves. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | EL 500 kV GRAJAU LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ | RB | FT LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GRAJAU | EL 500 kV GRAJAU LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ | RB | FT LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ | 062/2001 | IPCA | RBNI | REA 4347/2013 | 4/9/2018 | 4/8/2033 | R$12,072.59 | 6/1/2025 | Ativa | Substituição de RDP * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 – 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | EL 500 kV GRAJAU LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GRAJAU | EL 500 kV GRAJAU LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 9/7/2015 | 8/1/2037 | R$13,145.03 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARARAIO LTADGR STGR FASE A - Nº Oper: LTADGR - PMI (005516/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | EL 500 kV GRAJAU LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 9/7/2015 | 8/1/2037 | R$13,145.03 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARARAIO LTADGR STGR FASE B - Nº Oper: LTADGR - PMI (005517/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | EL 500 kV GRAJAU LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 9/7/2015 | 8/1/2037 | R$13,145.03 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARARAIO LTADGR STGR FASE C - Nº Oper: LTADGR - PMI (005518/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | EL 500 kV GRAJAU LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ | 062/2001 | IPCA | RBNI | REA 4347/2013 | 4/9/2018 | 4/8/2033 | R$21,770.83 | 6/1/2025 | Ativa | Substituição de RDP. No setor de 500 Kv * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | EL 500 kV GRAJAU LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/10/2015 | 11/9/2030 | R$233,771.62 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | GRAJAU | EL 138 kV GRAJAU LT 138 kV TERMINAL SUL /GRAJAU C-4 RJ | DIT | 062/2001 | IPCA | RCDM | REA 4552/2014 | 2/26/2018 | 8/8/2053 | R$ 1,099,175.82 | 6/1/2025 | Ativa | T2014-012 | Obra de Substituição Completa - Substituição de um módulo de entrada de linha em 138 kV, arranjo barra dupla a três chaves, para conexão da Linha de Transmissão 138 kV Terminal Sul - Grajaú C4, com conexão ao setor de 138 kV por cabos subterrâneos. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | EL 138 kV GRAJAU LT 138 kV TERMINAL SUL /GRAJAU C-3 RJ | DIT | 062/2001 | IPCA | RCDM | REA 4552/2014 | 2/26/2018 | 8/8/2053 | R$ 1,065,729.82 | 6/1/2025 | Ativa | T2014-012 | Obra de Substituição Completa - Substituição de um módulo de entrada de linha em 138 kV, arranjo barra dupla a três chaves, para conexão da Linha de Transmissão 138 kV Terminal Sul - Grajaú C3, com conexão ao setor de 138 kV por cabos subterrâneos. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | EL 138 kV GRAJAU LT 138 kV TERMINAL SUL /GRAJAU C-2 RJ | DIT | 062/2001 | IPCA | RCDM | REA 4552/2014 | 2/26/2018 | 8/8/2053 | R$ 1,065,694.29 | 6/1/2025 | Ativa | T2014-012 | Obra de Substituição Completa - Substituição de um módulo de entrada de linha em 138 kV, arranjo barra dupla a três chaves, para conexão da Linha de Transmissão 138 kV Terminal Sul - Grajaú C2, com conexão ao setor de 138 kV por cabos subterrâneos. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | EL 138 kV GRAJAU LT 138 kV TERMINAL SUL /GRAJAU C-1 RJ | DIT | 062/2001 | IPCA | RCDM | REA 4552/2014 | 2/26/2018 | 8/8/2053 | R$ 1,065,694.29 | 6/1/2025 | Ativa | T2014-012 | Obra de Substituição Completa - Substituição de um módulo de entrada de linha em 138 kV, arranjo barra dupla a três chaves, para conexão da Linha de Transmissão 138 kV Terminal Sul - Grajaú C2, com conexão ao setor de 138 kV por cabos subterrâneos. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | EL 138 kV GRAJAU LT 138 kV GRAJAU /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RCDM | REA 4552/2014 | 2/26/2018 | 3/25/2054 | R$ 1,065,036.14 | 6/1/2025 | Ativa | T2014-012 | Obra de Substituição Completa - Substituição de um módulo de entrada de linha em 138 kV, arranjo barra dupla a três chaves, para conexão da Linha de Transmissão 138 kV Grajaú - Jacarepaguá C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | EL 138 kV GRAJAU LT 138 kV FREI CANECA /GRAJAU C-6 RJ | DIT | 062/2001 | IPCA | RCDM | REA 4552/2014 | 2/26/2018 | 2/25/2054 | R$ 1,022,493.66 | 6/1/2025 | Ativa | T2014-012 | Obra de Substituição Completa - Substituição de um módulo de entrada de linha em 138 kV, arranjo barra dupla a três chaves, para conexão da Linha de Transmissão 138 kV Frei Caneca - Grajaú C6, com conexão ao setor de 138 kV por cabos subterrâneos. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | EL 138 kV GRAJAU LT 138 kV FREI CANECA /GRAJAU C-5 RJ | DIT | 062/2001 | IPCA | RCDM | REA 4552/2014 | 2/26/2018 | 2/25/2057 | R$ 1,090,818.78 | 6/1/2025 | Ativa | T2014-012 | Obra de Substituição Completa - Substituição de um módulo de entrada de linha em 138 kV, arranjo barra dupla a três chaves, para conexão da Linha de Transmissão 138 kV Frei Caneca - Grajaú C5, com conexão ao setor de 138 kV por cabos subterrâneos. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | EL 138 kV GRAJAU LT 138 kV FREI CANECA /GRAJAU C-4 RJ | DIT | 062/2001 | IPCA | RCDM | REA 4552/2014 | 2/26/2018 | 1/8/2054 | R$ 1,048,001.24 | 6/1/2025 | Ativa | T2014-012 | Obra de Substituição Completa - Substituição de um módulo de entrada de linha em 138 kV, arranjo barra dupla a três chaves, para conexão da Linha de Transmissão 138 kV Frei Caneca - Grajaú C4, com conexão ao setor de 138 kV por cabos subterrâneos. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | EL 138 kV GRAJAU LT 138 kV FREI CANECA /GRAJAU C-3 RJ | DIT | 062/2001 | IPCA | RCDM | REA 4552/2014 | 2/26/2018 | 12/11/2053 | R$ 1,064,905.78 | 6/1/2025 | Ativa | T2014-012 | Obra de Substituição Completa - Substituição de um módulo de entrada de linha em 138 kV, arranjo barra dupla a três chaves, para conexão da Linha de Transmissão 138 kV Frei Caneca - Grajaú C3, com conexão ao setor de 138 kV por cabos subterrâneos. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | EL 138 kV GRAJAU LT 138 kV FREI CANECA /GRAJAU C-2 RJ | DIT | 062/2001 | IPCA | RCDM | REA 4552/2014 | 2/26/2018 | 12/2/2053 | R$ 1,073,310.50 | 6/1/2025 | Ativa | T2014-012 | Obra de Substituição Completa - Substituição de um módulo de entrada de linha em 138 kV, arranjo barra dupla a três chaves, para conexão da Linha de Transmissão 138 kV Frei Caneca - Grajaú C2, com conexão ao setor de 138 kV por cabos subterrâneos. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | EL 138 kV GRAJAU LT 138 kV FREI CANECA /GRAJAU C-1 RJ | DIT | 062/2001 | IPCA | RCDM | REA 4552/2014 | 2/26/2018 | 12/16/2053 | R$ 1,062,401.26 | 6/1/2025 | Ativa | T2014-012 | Obra de Substituição Completa - Substituição de um módulo de entrada de linha em 138 kV, arranjo barra dupla a três chaves, para conexão da Linha de Transmissão 138 kV Frei Caneca - Grajaú C1, com conexão ao setor de 138 kV por cabos subterrâneos. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | EL 138 kV GRAJAU LT 138 kV CASCADURA /GRAJAU C-5 RJ | DIT | 062/2001 | IPCA | RCDM | REA 4552/2014 | 2/26/2018 | 7/21/2053 | R$ 1,065,761.04 | 6/1/2025 | Ativa | T2014-012 | Obra de Substituição Completa - Substituição de um módulo de entrada de linha em 138 kV, arranjo barra dupla a três chaves, para conexão da Linha de Transmissão 138 kV Cascadura - Grajaú C5. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | EL 138 kV GRAJAU LT 138 kV CASCADURA /GRAJAU C-4 RJ | DIT | 062/2001 | IPCA | RCDM | REA 4552/2014 | 2/26/2018 | 7/21/2053 | R$ 1,065,778.04 | 6/1/2025 | Ativa | T2014-012 | Obra de Substituição Completa - Substituição de um módulo de entrada de linha em 138 kV, arranjo barra dupla a três chaves, para conexão da Linha de Transmissão 138 kV Cascadura - Grajaú C4. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | EL 138 kV GRAJAU LT 138 kV CASCADURA /GRAJAU C-3 RJ | DIT | 062/2001 | IPCA | RCDM | REA 4552/2014 | 2/26/2018 | 7/21/2053 | R$ 1,065,761.04 | 6/1/2025 | Ativa | T2014-012 | Obra de Substituição Completa - Substituição de um módulo de entrada de linha em 138 kV, arranjo barra dupla a três chaves, para conexão da Linha de Transmissão 138 kV Cascadura - Grajaú C3. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | EL 138 kV GRAJAU LT 138 kV CASCADURA /GRAJAU C-2 RJ | DIT | 062/2001 | IPCA | RCDM | REA 4552/2014 | 2/26/2018 | 7/21/2053 | R$ 1,065,761.04 | 6/1/2025 | Ativa | T2014-012 | Obra de Substituição Completa - Substituição de um módulo de entrada de linha em 138 kV, arranjo barra dupla a três chaves, para conexão da Linha de Transmissão 138 kV Cascadura - Grajaú C2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | EL 138 kV GRAJAU LT 138 kV CASCADURA /GRAJAU C-1 RJ | DIT | 062/2001 | IPCA | RCDM | REA 4552/2014 | 2/26/2018 | 7/16/2053 | R$ 1,065,777.72 | 6/1/2025 | Ativa | T2014-012 | Obra de Substituição Completa - Substituição de um módulo de entrada de linha em 138 kV, arranjo barra dupla a três chaves, para conexão da Linha de Transmissão 138 kV Cascadura - Grajaú C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GRAJAU | CS 200/-150 Mvar GRAJAU CS2 RJ | RBF | FT CS 200/-150 MVAr GRAJAU CS2 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,898,732.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GRAJAU | CS 200/-150 Mvar GRAJAU CS2 RJ | RBF | FT CS 200/-150 MVAr GRAJAU CS2 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 7,286,153.89 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GRAJAU | CS 200/-150 Mvar GRAJAU CS1 RJ | RBF | FT CS 200/-150 MVAr GRAJAU CS1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,898,732.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GRAJAU | CS 200/-150 Mvar GRAJAU CS1 RJ | RBF | FT CS 200/-150 MVAr GRAJAU CS1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 7,286,153.89 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | TR 525/230 kV GRAVATAI TRR1 RS | RB | FT TR 525/230 kV GRAVATAI TRR1 RS | 057/2001 | IPCA | RMEL | REA 10921/2021 | 11/25/2024 | 11/24/2059 | R$ 3,352,363.89 | 6/1/2025 | Ativa | T2021-113 | Obra de Substituição Completa - Substituir na SE Farroupilha o autotransformador monofásico reserva - TFR1 - 525/230 kV - 224 MVA por outro de 224 MVA. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Sul | GRAVATAI | TR 525/230 kV GRAVATAI TR3 RS | RB | FT TR 525/230 kV GRAVATAI TR3 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,674,009.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | TR 525/230 kV GRAVATAI TR3 RS | RB | FT TR 525/230 kV GRAVATAI TR3 RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,938,023.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | TR 525/230 kV GRAVATAI TR3 RS | RB | FT TR 525/230 kV GRAVATAI TR3 RS | 057/2001 | IPCA | RMELP | REA 13930/2023 | R$ 8,299,577.98 | 6/1/2025 | Prevista | T2023-012 | Obra de Substituição Completa - Substituição do autotransformador monofásico com comutador sob carga, TF3, 525/230 kV, 3x224 MVA, SE Gravataí. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 0001386/2021, 0001391/2021 e 0001396/2021. | ||||
| AXIA Energia Sul | GRAVATAI | TR 525/230 kV GRAVATAI TR2 RS | RB | FT TR 525/230 kV GRAVATAI TR2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,674,009.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | TR 525/230 kV GRAVATAI TR2 RS | RB | FT TR 525/230 kV GRAVATAI TR2 RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,938,023.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | TR 525/230 kV GRAVATAI TR2 RS | RB | FT TR 525/230 kV GRAVATAI TR2 RS | 057/2001 | IPCA | RMELP | REA 13930/2023 | R$ 8,299,577.98 | 6/1/2025 | Prevista | T2023-011 | Obra de Substituição Completa - Substituição do autotransformador monofásico com comutador sob carga, TF2, 525/230 kV, 3x224 MVA, Fases A, B e C, SE Gravataí. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 0001368/2021, 0001372/2021 e 0001377/2021. | 4T25 | |||
| AXIA Energia Sul | GRAVATAI | TR 525/230 kV GRAVATAI TR1 RS | RB | FT TR 525/230 kV GRAVATAI TR1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,674,009.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | TR 525/230 kV GRAVATAI TR1 RS | RB | FT TR 525/230 kV GRAVATAI TR1 RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,938,023.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | TR 525/230 kV GRAVATAI TR1 RS | RB | FT TR 525/230 kV GRAVATAI TR1 RS | 057/2001 | IPCA | RMEL | REA 9918/2021 | 5/27/2021 | 5/4/2056 | R$ 2,826,495.54 | 6/1/2025 | Ativa | T2020-034 | Obra de Substituição Parcial - Substituição do autotransformador monofásico (fase B) do banco de autotransformadores ATF1 525/230 kV, 224 MVA, da SE Gravataí. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Não foi considerada receita adicional de O&M para a nova fase por não se tratar de um módulo de equipamento completo. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | GRAVATAI | TR 525/230 kV GRAVATAI TR1 RS | RB | FT TR 525/230 kV GRAVATAI TR1 RS | 057/2001 | IPCA | RMELP | REA 11323/2022 | R$ 5,820,689.22 | 6/1/2025 | Prevista | T2021-099 | Obra de Substituição Parcial (Completada) - Substituir na SE Gravataí as fases A e C do autotransformador monofásico TF1 525/230 kV - 224 MVA cada, por outras duas de 224 MVA. Não foi considerada receita adicional de O&M pois não se trata de um módulo de equipamento completo. | 3T25 | |||
| AXIA Energia Sul | GRAVATAI | RTL 525 kV 150 Mvar GRAVATAI RT1 RS | RB | FT RTL 525 kV 150 Mvar GRAVATAI RT1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$669,604.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | RTL 525 kV 150 Mvar GRAVATAI RT1 RS | RB | FT RTL 525 kV 150 Mvar GRAVATAI RT1 RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,175,211.47 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | RTB 525 kV 50 Mvar GRAVATAI RTR1 RS | RB | FT RTB 525 kV 50 Mvar GRAVATAI RTR1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$223,201.61 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | RTB 525 kV 50 Mvar GRAVATAI RTR1 RS | RB | FT RTB 525 kV 50 Mvar GRAVATAI RTR1 RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$391,737.16 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | RTB 525 kV 150 Mvar GRAVATAI RT2 RS | RB | FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$669,604.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | RTB 525 kV 150 Mvar GRAVATAI RT2 RS | RB | FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,175,211.47 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | RTB 525 kV 150 Mvar GRAVATAI RT2 RS | RB | FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$995,424.62 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | RTB 525 kV 150 Mvar GRAVATAI RT2 RS | RB | FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS | 057/2001 | IPCA | RMEL | REA 9918/2021 | 5/27/2021 | 5/6/2057 | R$920,888.20 | 6/1/2025 | Ativa | T2020-033 | Obra de Substituição Parcial - Substituição da fase B do Reator RT2 525 kV, 150 Mvar, da SE Gravataí. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Não foi considerada receita adicional de O&M para a nova fase por não se tratar de um módulo de equipamento completo. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | GRAVATAI | RTB 525 kV 150 Mvar GRAVATAI RT2 RS | RB | FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS | 057/2001 | IPCA | RMELP | REA 13930/2023 | R$ 1,927,093.52 | 6/1/2025 | Prevista | T2023-002 | Obra de Substituição Parcial (Completada) - Substituição do reator monofásico, RE2, 525kV, 3x50 Mvar, Fases A e C. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 0001419/2021 e 0001431/2021. | 4T25 | |||
| AXIA Energia Sul | GRAVATAI | RTB 500 kV 50 Mvar GRAVATAI RTR3 RS | RB | FT RTB 500 kV 50 Mvar GRAVATAI RTR3 RS | 057/2001 | IPCA | RBNIA | REA 11537/2022 | R$880,841.98 | 6/1/2025 | Prevista | T2022-069 | Reator de barra monofásico reserva RTR3 525 kV, 50 Mvar | 4T25 | |||
| AXIA Energia Sul | GRAVATAI | RTB 500 kV 150 Mvar GRAVATAI RT3 RS | RB | FT RTB 500 kV 150 Mvar GRAVATAI RT3 RS | 057/2001 | IPCA | RBNIA | REA 11537/2022 | R$ 2,642,525.98 | 6/1/2025 | Prevista | T2022-069 | Banco de reatores de barra monofásicos RT3 525 kV, 3x50 Mvar | 4T25 | |||
| AXIA Energia Sul | GRAVATAI | MG 525 kV GRAVATAI MG1 RS | RB | FT MG 525 kV GRAVATAI MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,390,131.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | MG 525 kV GRAVATAI MG1 RS | RB | FT MG 525 kV GRAVATAI MG1 RS | 057/2001 | IPCA | RMEL | REN 643/2014 | 10/27/2014 | 10/26/2031 | R$9,282.08 | 6/1/2025 | Ativa | Substituição de 1 baterias 48 Vcc (primeira de duas) Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | MG 525 kV GRAVATAI MG1 RS | RB | FT MG 525 kV GRAVATAI MG1 RS | 057/2001 | IPCA | RMEL | REN 643/2014 | 10/17/2014 | 10/16/2031 | R$9,266.01 | 6/1/2025 | Ativa | Substituição de 1 baterias 48 Vcc. (segunda de duas) Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | MG 525 kV GRAVATAI MG1 RS | RB | FT MG 525 kV GRAVATAI MG1 RS | 057/2001 | IPCA | RBNIA | REA 11537/2022 | R$665,514.08 | 6/1/2025 | Prevista | T2022-069 | Módulo de Manobra: Infraestrutura (DJM - 500 kV) | 4T25 | |||
| AXIA Energia Sul | GRAVATAI | MG 525 kV GRAVATAI MG1 RS | RB | FT MG 525 kV GRAVATAI MG1 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 6/20/2020 | 12/13/2046 | R$187,951.85 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | MC 525 kV TR 525/230 kV GRAVATAI TR3 RS | RB | FT TR 525/230 kV GRAVATAI TR3 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$358,630.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | MC 525 kV TR 525/230 kV GRAVATAI TR3 RS | RB | FT TR 525/230 kV GRAVATAI TR3 RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$629,425.18 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | MC 525 kV TR 525/230 kV GRAVATAI TR3 RS | RB | FT TR 525/230 kV GRAVATAI TR3 RS | 057/2001 | IPCA | RMEL | REN 643/2014 | 4/8/2015 | 4/7/2039 | R$68,305.38 | 6/1/2025 | Ativa | Substituição dos PRs de Sic por ZnO dos TFs 1, 2 e 3 e do circuito Caxias * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 (RAP ALTERADA NO RECURSO CONTRA A REH 2.258/2017). | |||
| AXIA Energia Sul | GRAVATAI | MC 525 kV TR 525/230 kV GRAVATAI TR3 RS | RB | FT TR 525/230 kV GRAVATAI TR3 RS | 057/2001 | IPCA | RBNI | REA 5861/2016 | 6/3/2019 | 6/2/2034 | R$106,700.47 | 6/1/2025 | Ativa | Substituição das proteções dos transformadores 1, 2 e 3. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | MC 525 kV TR 525/230 kV GRAVATAI TR2 RS | RB | FT TR 525/230 kV GRAVATAI TR2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$358,630.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | MC 525 kV TR 525/230 kV GRAVATAI TR2 RS | RB | FT TR 525/230 kV GRAVATAI TR2 RS | 057/2001 | IPCA | RMEL | REN 643/2014 | 5/1/2014 | 4/30/2038 | R$36,965.10 | 6/1/2025 | Ativa | Substituição dos para-raios de 420 kV do TF2 Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | MC 525 kV TR 525/230 kV GRAVATAI TR2 RS | RB | FT TR 525/230 kV GRAVATAI TR2 RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$629,425.18 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | MC 525 kV TR 525/230 kV GRAVATAI TR2 RS | RB | FT TR 525/230 kV GRAVATAI TR2 RS | 057/2001 | IPCA | RBNI | REA 5861/2016 | 6/3/2019 | 6/2/2034 | R$106,700.47 | 6/1/2025 | Ativa | Substituição das proteções dos transformadores 1, 2 e 3. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | MC 525 kV TR 525/230 kV GRAVATAI TR1 RS | RB | FT TR 525/230 kV GRAVATAI TR1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$358,630.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | MC 525 kV TR 525/230 kV GRAVATAI TR1 RS | RB | FT TR 525/230 kV GRAVATAI TR1 RS | 057/2001 | IPCA | RMEL | REN 643/2014 | 4/10/2016 | 4/9/2040 | R$40,175.95 | 6/1/2025 | Ativa | Substituição dos PRs de Sic por ZnO dos TFs 1, 2 e 3 e do circuito Caxias * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 (RAP ALTERADA NO RECURSO CONTRA A REH 2.258/2017) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | MC 525 kV TR 525/230 kV GRAVATAI TR1 RS | RB | FT TR 525/230 kV GRAVATAI TR1 RS | 057/2001 | IPCA | RBNI | REA 5861/2016 | 6/3/2019 | 6/2/2034 | R$106,700.47 | 6/1/2025 | Ativa | Substituição das proteções dos transformadores 1, 2 e 3. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | MC 525 kV RTL 525 kV 150 Mvar GRAVATAI RT1 RS | RB | FT RTL 525 kV 150 Mvar GRAVATAI RT1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$217,273.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | MC 525 kV RTL 525 kV 150 Mvar GRAVATAI RT1 RS | RB | FT RTL 525 kV 150 Mvar GRAVATAI RT1 RS | 057/2001 | IPCA | RMEL | REN 443/2011 | 12/15/2016 | 12/14/2040 | R$8,070.26 | 6/1/2025 | Ativa | Substituição dos para-raios 525 kV do RE1 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | MC 525 kV RTL 525 kV 150 Mvar GRAVATAI RT1 RS | RB | FT RTL 525 kV 150 Mvar GRAVATAI RT1 RS | 057/2001 | IPCA | RBNI | REA 5861/2016 | 6/17/2019 | 10/11/2038 | R$145,518.36 | 6/1/2025 | Ativa | Substituição das proteções dos Reatores 1 e 2. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | MC 525 kV RTL 525 kV 150 Mvar GRAVATAI RT1 RS | RB | FT RTL 525 kV 150 Mvar GRAVATAI RT1 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/30/2020 | 5/12/2046 | R$82,271.71 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | MC 525 kV RTB 525 kV 150 Mvar GRAVATAI RT2 RS | RB | FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$335,783.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | MC 525 kV RTB 525 kV 150 Mvar GRAVATAI RT2 RS | RB | FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS | 057/2001 | IPCA | RMEL | REN 643/2014 | 4/8/2015 | 4/7/2039 | R$38,511.76 | 6/1/2025 | Ativa | Substituição pararaios 525kV do Reator 2 no módulo ´MC 500 kV RTB 500 kV 150 Mvar GRAVATAI RT2 RS´. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | MC 525 kV RTB 525 kV 150 Mvar GRAVATAI RT2 RS | RB | FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$589,327.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | MC 525 kV RTB 525 kV 150 Mvar GRAVATAI RT2 RS | RB | FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS | 057/2001 | IPCA | RBNI | REA 5861/2016 | 6/17/2019 | 6/16/2034 | R$108,897.01 | 6/1/2025 | Ativa | Substituição das proteções dos Reatores 1 e 2. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | MC 525 kV RTB 525 kV 150 Mvar GRAVATAI RT2 RS | RB | FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/27/2023 | 1/26/2056 | R$247,862.72 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | MC 500 kV RTB 500 kV 150 Mvar GRAVATAI RT3 RS | RB | FT RTB 500 kV 150 Mvar GRAVATAI RT3 RS | 057/2001 | IPCA | RBNIA | REA 11537/2022 | R$ 2,076,291.07 | 6/1/2025 | Prevista | T2022-069 | Instalação de módulo de manobra - conexão de reator de barra para o banco de reatores RT3 525 kV, 3x50 Mvar | 4T25 | |||
| AXIA Energia Sul | GRAVATAI | MC 230 kV TR 525/230 kV GRAVATAI TR3 RS | RB | FT TR 525/230 kV GRAVATAI TR3 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$90,126.76 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | MC 230 kV TR 525/230 kV GRAVATAI TR3 RS | RB | FT TR 525/230 kV GRAVATAI TR3 RS | 057/2001 | IPCA | RBNI | REA 4347/2013 | 4/12/2015 | 4/14/2045 | R$37,734.03 | 6/1/2025 | Ativa | Substituição de 3 TCs de 230kV do TF3.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | MC 230 kV TR 525/230 kV GRAVATAI TR2 RS | RB | FT TR 525/230 kV GRAVATAI TR2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$90,126.76 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | MC 230 kV TR 525/230 kV GRAVATAI TR2 RS | RB | FT TR 525/230 kV GRAVATAI TR2 RS | 057/2001 | IPCA | RMEL | REN 643/2014 | 12/8/2013 | 12/7/2037 | R$17,465.69 | 6/1/2025 | Ativa | Substituição dos para-raios de 192kV do TF2.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | MC 230 kV TR 525/230 kV GRAVATAI TR2 RS | RB | FT TR 525/230 kV GRAVATAI TR2 RS | 057/2001 | IPCA | RBNI | REA 4347/2013 | 4/12/2015 | 4/14/2045 | R$37,734.03 | 6/1/2025 | Ativa | Substituição de 3 TCs de 230kV do TF2.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | MC 230 kV TR 525/230 kV GRAVATAI TR1 RS | RB | FT TR 525/230 kV GRAVATAI TR1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$90,126.76 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | MC 230 kV TR 525/230 kV GRAVATAI TR1 RS | RB | FT TR 525/230 kV GRAVATAI TR1 RS | 057/2001 | IPCA | RMEL | REN 643/2014 | 10/20/2013 | 10/19/2037 | R$17,359.16 | 6/1/2025 | Ativa | Substituição dos para-raios de 192kV do TF1.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | MC 230 kV TR 525/230 kV GRAVATAI TR1 RS | RB | FT TR 525/230 kV GRAVATAI TR1 RS | 057/2001 | IPCA | RBNI | REA 4347/2013 | 4/12/2015 | 4/14/2045 | R$37,734.03 | 6/1/2025 | Ativa | Substituição de 3 TCs de 230kV do TF1.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | IB 525 kV MG 525 kV GRAVATAI MG1 RS IB6 | RB | FT MG 525 kV GRAVATAI MG1 RS | 057/2001 | IPCA | RBNIA | REA 11537/2022 | R$ 2,554,692.63 | 6/1/2025 | Prevista | T2022-069 | Instalação do Módulo de Manobra: Interligação de Barramentos (DJM - 500 kV). | 4T25 | |||
| AXIA Energia Sul | GRAVATAI | IB 525 kV MG 525 kV GRAVATAI MG1 RS IB3 | RB | FT MG 525 kV GRAVATAI MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | IB 525 kV MG 525 kV GRAVATAI MG1 RS IB3 | RB | FT MG 525 kV GRAVATAI MG1 RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$667,954.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | IB 525 kV MG 525 kV GRAVATAI MG1 RS IB3 | RB | FT MG 525 kV GRAVATAI MG1 RS | 057/2001 | IPCA | RBNI | REA 5861/2016 | 6/7/2019 | 6/6/2034 | R$88,162.67 | 6/1/2025 | Ativa | Substituição das proteções dos barramentos. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | IB 525 kV MG 525 kV GRAVATAI MG1 RS IB3 | RB | FT MG 525 kV GRAVATAI MG1 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 3/27/2020 | 3/26/2035 | R$45,827.90 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | IB 525 kV MG 525 kV GRAVATAI MG1 RS IB2 | RB | FT MG 525 kV GRAVATAI MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | IB 525 kV MG 525 kV GRAVATAI MG1 RS IB2 | RB | FT MG 525 kV GRAVATAI MG1 RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$667,954.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | IB 525 kV MG 525 kV GRAVATAI MG1 RS IB2 | RB | FT MG 525 kV GRAVATAI MG1 RS | 057/2001 | IPCA | RBNI | REA 5861/2016 | 6/7/2019 | 6/6/2034 | R$88,162.67 | 6/1/2025 | Ativa | Substituição das proteções dos barramentos. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | IB 525 kV MG 525 kV GRAVATAI MG1 RS IB2 | RB | FT MG 525 kV GRAVATAI MG1 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 3/27/2020 | 3/26/2035 | R$45,827.90 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | IB 525 kV MG 525 kV GRAVATAI MG1 RS IB1 | RB | FT MG 525 kV GRAVATAI MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | IB 525 kV MG 525 kV GRAVATAI MG1 RS IB1 | RB | FT MG 525 kV GRAVATAI MG1 RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$667,954.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | IB 525 kV MG 525 kV GRAVATAI MG1 RS IB1 | RB | FT MG 525 kV GRAVATAI MG1 RS | 057/2001 | IPCA | RBNI | REA 5861/2016 | 6/7/2019 | 8/25/2036 | R$119,541.01 | 6/1/2025 | Ativa | Substituição das proteções dos barramentos. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | IB 525 kV MG 525 kV GRAVATAI MG1 RS IB1 | RB | FT MG 525 kV GRAVATAI MG1 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 11/21/2022 | 9/22/2039 | R$51,901.22 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | EL 525 kV GRAVATAI LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS | RB | FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | EL 525 kV GRAVATAI LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS | RB | FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$713,154.95 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | EL 525 kV GRAVATAI LT 525 kV CAXIAS /GRAVATAI C-1 RS | RB | FT LT 525 kV CAXIAS /GRAVATAI C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI | EL 525 kV GRAVATAI LT 525 kV CAXIAS /GRAVATAI C-1 RS | RB | FT LT 525 kV CAXIAS /GRAVATAI C-1 RS | 057/2001 | IPCA | RMEL | REN 643/2014 | 5/18/2014 | 5/17/2038 | R$37,041.94 | 6/1/2025 | Ativa | Substituição dos para-raios de 420 kV circuito Caxias. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | EL 525 kV GRAVATAI LT 525 kV CAXIAS /GRAVATAI C-1 RS | RB | FT LT 525 kV CAXIAS /GRAVATAI C-1 RS | 057/2001 | IPCA | RMEL | REN 643/2014 | 3/13/2016 | 3/16/2046 | R$55,195.51 | 6/1/2025 | Ativa | Substituição de 3 TPCs do circuito Caxias * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI | EL 525 kV GRAVATAI LT 525 kV CAXIAS /GRAVATAI C-1 RS | RB | FT LT 525 kV CAXIAS /GRAVATAI C-1 RS | 057/2001 | IPCA | RBNI | REA 5861/2016 | 6/5/2019 | 6/4/2034 | R$245,130.91 | 6/1/2025 | Ativa | Substituição das proteções da linha de transmissão Caxias. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI 2 | MG 230 kV GRAVATAI 2 MG2 RS | RB | FT MG 230 kV GRAVATAI 2 MG2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$329,079.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI 2 | MC 230 kV BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS | RB | FT BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$156,339.26 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI 2 | MC 230 kV BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS | RB | FT BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS | 057/2001 | IPCA | RBNI | REA 4347/2013 | 9/10/2015 | 9/12/2045 | R$38,263.56 | 6/1/2025 | Ativa | Substituição de 6 TCs de 230 kV dos Bancos de Capacitores 4 e 5. INCLUÍDA NO CICLO 2016/2017 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI 2 | MC 230 kV BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS | RB | FT BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS | 057/2001 | IPCA | RBNI | REA 5861/2016 | 6/7/2019 | 6/6/2034 | R$26,108.02 | 6/1/2025 | Ativa | Substituição da proteção dos bancos de capacitores 4 e 5 para a implementação do SEP de conexão automáticos dos capacitores de 230 kV da SE Gravatai 2 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI 2 | MC 230 kV BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS | RB | FT BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$156,339.26 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI 2 | MC 230 kV BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS | RB | FT BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS | 057/2001 | IPCA | RBNI | REA 4347/2013 | 9/10/2015 | 9/12/2045 | R$38,263.56 | 6/1/2025 | Ativa | Substituição de 6 TCs de 230 kV dos Bancos de Capacitores 4 e 5. INCLUÍDA NO CICLO 2016/2017 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI 2 | MC 230 kV BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS | RB | FT BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS | 057/2001 | IPCA | RBNI | REA 5861/2016 | 6/7/2019 | 6/6/2034 | R$26,108.02 | 6/1/2025 | Ativa | Substituição da proteção dos bancos de capacitores 4 e 5 para a implementação do SEP de conexão automáticos dos capacitores de 230 kV da SE Gravatai 2 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI 2 | BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS | RB | FT BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$213,902.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI 2 | BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS | RB | FT BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS | 057/2001 | IPCA | RMEL | REN 643/2014 | 8/23/2015 | 8/22/2043 | R$11,736.13 | 6/1/2025 | Ativa | Instalação de sincronizador para manobra controlada dos bancos de capacitores BC5. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI 2 | BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS | RB | FT BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS | 057/2001 | IPCA | RMELP | REA 13930/2023 | R$661,458.80 | 6/1/2025 | Prevista | T2023-009 | Obra de Substituição Completa - Substituição do banco de capacitores, BC5, 230 kV, 100 Mvar, SE Gravataí 2. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 0001473/2021. | ||||
| AXIA Energia Sul | GRAVATAI 2 | BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS | RB | FT BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$213,902.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI 2 | BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS | RB | FT BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS | 057/2001 | IPCA | RMEL | REN 643/2014 | 8/16/2015 | 8/15/2043 | R$11,713.74 | 6/1/2025 | Ativa | Instalação de sincronizador para manobra controlada dos bancos de capacitores BC4 e BC5. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | GRAVATAI 2 | BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS | RB | FT BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS | 057/2001 | IPCA | RMELP | REA 13930/2023 | R$661,458.80 | 6/1/2025 | Prevista | T2023-008 | Obra de Substituição Completa - Substituição do banco de capacitores, BC4, 230 kV, 100 Mvar, SE Gravataí 2. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 0001471/2021. | ||||
| AXIA Energia Sul | GRAVATAI 3 | TR 230/69 kV GRAVATAI 3 TRR1 RS | RBF | FT TR 230/69 kV GRAVATAI 3 TRR1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$180,045.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI 3 | TR 230/69 kV GRAVATAI 3 TR2 RS | RBF | FT TR 230/69 kV GRAVATAI 3 TR2 RS | 057/2001 | IPCA | RBNIA | REA 15197/2024 | R$ 3,914,996.94 | 6/1/2025 | Prevista | T2024-005 | Instalação do 2º Transformador de Potência 230/69 kV Monofásico de 3x 55 MVA na SE Gravataí 3 | ||||
| AXIA Energia Sul | GRAVATAI 3 | TR 230/69 kV GRAVATAI 3 TR1 RS | RBF | FT TR 230/69 kV GRAVATAI 3 TR1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$540,136.91 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI 3 | MG 230 kV GRAVATAI 3 MG1 RS | RB | FT MG 230 kV GRAVATAI 3 MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$405,791.16 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI 3 | MG 230 kV GRAVATAI 3 MG1 RS | RB | FT MG 230 kV GRAVATAI 3 MG1 RS | 057/2001 | IPCA | RBNIA | REA 15197/2024 | R$188,057.77 | 6/1/2025 | Prevista | T2024-005 | Instalação de Módulo de Infraestrutura de Manobra (MIM) associado à conexão em 230 kV, arranjo BD4, para 2º TF 230/69 kV – 165 MVA, na SE Gravataí 3. | ||||
| AXIA Energia Sul | GRAVATAI 3 | MG 230 kV GRAVATAI 3 MG1 RS | RB | FT MG 230 kV GRAVATAI 3 MG1 RS | 057/2001 | IPCA | RBNIA | REA 15197/2024 | R$54,105.11 | 6/1/2025 | Prevista | T2024-005 | Módulo de Infraestrutura de Manobra (MIM) associado à conexão em 69 kV, arranjo BPT, para 2º TF 230/69 kV – 165 MVA, na SE Gravataí 3. | ||||
| AXIA Energia Sul | GRAVATAI 3 | MG 230 kV GRAVATAI 3 MG1 RS | RB | FT MG 230 kV GRAVATAI 3 MG1 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 11/8/2020 | 10/20/2036 | R$65,115.31 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | GRAVATAI 3 | MC 69 kV TR 230/69 kV GRAVATAI 3 TR2 RS | RBF | FT TR 230/69 kV GRAVATAI 3 TR2 RS | 057/2001 | IPCA | RBNIA | REA 15197/2024 | R$602,209.66 | 6/1/2025 | Prevista | T2024-005 | Conexão de Transformador 69 kV - BPT do 2º Transformador de Potência TR2 Monofásico de 3x 55 MVA na SE Gravataí 3 | ||||
| AXIA Energia Sul | GRAVATAI 3 | MC 69 kV TR 230/69 kV GRAVATAI 3 TR1 RS | RBF | FT TR 230/69 kV GRAVATAI 3 TR1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$54,243.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI 3 | MC 230 kV TR 230/69 kV GRAVATAI 3 TR2 RS | RBF | FT TR 230/69 kV GRAVATAI 3 TR2 RS | 057/2001 | IPCA | RBNIA | REA 15197/2024 | R$ 1,672,506.85 | 6/1/2025 | Prevista | T2024-005 | Conexão de Transformador 230 kV - BD4 do 2º Transformador de Potência TR2 Monofásico de 3x 55 MVA na SE Gravataí 3 | ||||
| AXIA Energia Sul | GRAVATAI 3 | MC 230 kV TR 230/69 kV GRAVATAI 3 TR1 RS | RBF | FT TR 230/69 kV GRAVATAI 3 TR1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI 3 | IB 69 kV MG 230 kV GRAVATAI 3 MG1 RS IB2 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$36,457.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | GRAVATAI 3 | IB 230 kV MG 230 kV GRAVATAI 3 MG1 RS IB1 | RB | FT MG 230 kV GRAVATAI 3 MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,146.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI 3 | EL 69 kV GRAVATAI 3 DIST3 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,414.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | GRAVATAI 3 | EL 69 kV GRAVATAI 3 DIST2 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,414.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | GRAVATAI 3 | EL 69 kV GRAVATAI 3 DIST1 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$63,414.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | GRAVATAI 3 | EL 230 kV GRAVATAI 3 LT 230 kV GRAVATAI 2 /GRAVATAI 3 C-1 RS | RB | FT LT 230 kV GRAVATAI 2 /GRAVATAI 3 C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI 3 | EL 230 kV GRAVATAI 3 LT 230 kV C.I.AUT.GRA /GRAVATAI 3 C-1 RS | RB | FT LT 230 kV C.I.AUT.GRA /GRAVATAI 3 C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI 3 | EL 230 kV GRAVATAI 3 LT 230 kV ATLANTIDA 2 /GRAVATAI 3 C-1 RS | RB | FT LT 230 kV ATLANTIDA 2 /GRAVATAI 3 C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GRAVATAI 3 | EL 230 kV GRAVATAI 3 LT 230 kV ATLANTIDA 2 /GRAVATAI 3 C-1 RS | RB | FT LT 230 kV ATLANTIDA 2 /GRAVATAI 3 C-1 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/31/2023 | 1/30/2056 | R$ 731.00 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | GUAIBA 3 | RTL 525 kV 50 Mvar GUAIBA 3 RTR2 RS | RB | FT RTL 525 kV 50 Mvar GUAIBA 3 RTR2 RS | 020/2012 | IPCA | RBL | CC 020/2012 | 3/24/2015 | 8/27/2042 | R$772,287.41 | 6/1/2025 | Ativa | T2012-080-B | Contrato de Concessão nº020/2012 - RB * Receita revisada no reajuste da RAP do ciclo 2018-2019. * Receita revisada em 07-11-2023 | ||
| AXIA Energia Sul | GUAIBA 3 | RTL 525 kV 150 Mvar GUAIBA 3 RT4 RS | RB | FT LT 525 kV NOVA STA RITA /GUAIBA 3 C-1 RS | 020/2012 | IPCA | RBL | CC 020/2012 | 3/24/2015 | 8/27/2042 | R$ 2,316,862.23 | 6/1/2025 | Ativa | T2012-080-B | Contrato de Concessão nº020/2012 - RB * Receita revisada no reajuste da RAP do ciclo 2018-2019. * Receita revisada em 07-11-2023 | ||
| AXIA Energia Sul | GUAIBA 3 | MG 525 kV GUAIBA 3 MG3 RS | RB | FT MG 525 kV GUAIBA 3 MG3 RS | 020/2012 | IPCA | RBNI | DSP 682/2024 | 6/28/2023 | 6/27/2041 | R$77,793.90 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo Geral de Acessante 500 kV na SE Guaíba 3, associados as Entradas de Linha 500 kV para as SEs Nova Santa Rita e Povo Novo, em função do seccionamento da LT 500 kV Nova Santa Rita - Povo Novo na Subestação seccionadora Guaíba 3. | |||
| AXIA Energia Sul | GUAIBA 3 | MC 525 kV RTL 525 kV 150 Mvar GUAIBA 3 RT4 RS | RB | FT LT 525 kV NOVA STA RITA /GUAIBA 3 C-1 RS | 020/2012 | IPCA | RBL | CC 020/2012 | 3/24/2015 | 8/27/2042 | R$755,765.09 | 6/1/2025 | Ativa | T2012-080-B | Contrato de Concessão nº020/2012 - RB * Receita revisada no reajuste da RAP do ciclo 2018-2019. * Receita revisada em 07-11-2023 | ||
| AXIA Energia Sul | GUAIBA 3 | EL 525 kV GUAIBA 3 LT 525 kV NOVA STA RITA /GUAIBA 3 C-1 RS | RB | FT LT 525 kV NOVA STA RITA /GUAIBA 3 C-1 RS | 020/2012 | IPCA | RBNI | DSP 682/2024 | 6/28/2023 | 6/27/2051 | R$279,648.11 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV, arranjo Disjuntor e Meio, na Subestação Guaíba 3, associada à Linha de Transmissão 500 kV Nova Santa Rita – Guaíba 3 C2. | |||
| AXIA Energia Sul | GUAIBA 3 | EL 525 kV GUAIBA 3 LT 525 kV GUAIBA 3 /POVO NOVO C-1 RS | RB | FT LT 525 kV GUAIBA 3 /POVO NOVO C-1 RS | 020/2012 | IPCA | RBNI | DSP 682/2024 | 6/28/2023 | 6/27/2051 | R$279,648.11 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV, arranjo Disjuntor e Meio, na Subestação Guaíba 3, associada à Linha de Transmissão 500 kV Guaíba 3 – Povo Novo C1. | |||
| AXIA Energia Sul | GUAIRA | MG 525 kV GUAIRA MG2 PR | RB | FT MG 525 kV GUAIRA MG2 PR | 057/2001 | IPCA | RBNI | REA 8795/2020 | 5/8/2023 | 5/8/2041 | R$500,447.14 | 6/1/2025 | Ativa | T2020-030 | Instalar, na SE GUAIRA, complemento de módulo geral com MIG-A, em 525 kV, arranjo Disjuntor e Meio, para a reencabeçamento da LT para Cascavel Oeste. | ||
| AXIA Energia Sul | GUAIRA | EL 525 kV GUAIRA LT 525 kV CASCAVEL OEST /GUAIRA C-1 PR | RB | FT LT 525 kV CASCAVEL OEST /GUAIRA C-1 PR | 057/2001 | IPCA | RBNI | REA 8795/2020 | 5/8/2023 | 5/8/2052 | R$ 1,697,499.48 | 6/1/2025 | Ativa | T2020-030 | Instalação, na SE GUAIRA, de uma entrada de linha, em 525 kV, para a LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR, arranjo DJM, para que a LT passe a operar em 525kV. | ||
| AXIA Energia Norte | GUAMA | TR 230/69 kV GUAMA TRR1 PA | RBF | FT TR 230/69 kV GUAMA TRR1 PA | 058/2001 | IPCA | RMEL | REA 9918/2021 | 9/11/2023 | 9/10/2058 | R$ 1,196,246.62 | 6/1/2025 | Ativa | T2020-009 | Obra de Substituição Completa - Substituição de transformador de potência TRR1 230/69 kV, 50 MVA, na subestação Guamá. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Norte | GUAMA | TR 230/69 kV GUAMA TR3 PA | RBF | FT TR 230/69 kV GUAMA TR3 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$721,039.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | GUAMA | TR 230/69 kV GUAMA TR2 PA | RBF | FT TR 230/69 kV GUAMA TR2 PA | 058/2001 | IPCA | RMEL | REA 9918/2021 | 10/2/2023 | 10/1/2058 | R$ 3,588,739.89 | 6/1/2025 | Ativa | T2020-009 | Obra de Substituição Completa - Substituição, na SE GUAMA, de um Banco de transformação monofásica TR2 230/69-13,8 KV - 3x 50 MVA. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Norte | GUAMA | TR 230/69 kV GUAMA TR1 PA | RBF | FT TR 230/69 kV GUAMA TR1 PA | 058/2001 | IPCA | RMEL | REA 9918/2021 | 7/11/2024 | 7/10/2059 | R$ 3,624,994.79 | 6/1/2025 | Ativa | T2020-007 | Obra de Substituição Completa - Substituição, na SE GUAMA, de um Banco de transformação monofásica TR1 230/69-13,8 KV - 3x 50 MVA. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Norte | GUAMA | MG 230 kV GUAMA MG1 PA | RB | FT MG 230 kV GUAMA MG1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$657,590.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | GUAMA | MG 230 kV GUAMA MG1 PA | RB | FT MG 230 kV GUAMA MG1 PA | 058/2001 | IPCA | RMEL | REN 643/2014 | 10/31/2014 | 11/2/2044 | R$16,100.32 | 6/1/2025 | Ativa | Substituição de 11 TPCs de 230 kv na SE Guamá , sendo esse o primeiro de dois TPCs no módulo Geral. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | GUAMA | MG 230 kV GUAMA MG1 PA | RB | FT MG 230 kV GUAMA MG1 PA | 058/2001 | IPCA | RMEL | REN 643/2014 | 12/18/2014 | 12/20/2044 | R$16,173.26 | 6/1/2025 | Ativa | Substituição de 11 TPCs de 230 kv na SE Guamá , sendo esse o segundo de dois TPCs no módulo Geral. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | GUAMA | MG 230 kV GUAMA MG1 PA | RB | FT MG 230 kV GUAMA MG1 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 5/5/2014 | 9/9/2033 | R$62,663.70 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | GUAMA | MG 230 kV GUAMA MG1 PA | RB | FT MG 230 kV GUAMA MG1 PA | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 9/17/2012 | 9/16/2027 | R$21,286.58 | 6/1/2025 | Ativa | 01 GPS E 02 RDPS DE 8 CANAIS ANALOGICOS E 32 DIGITAIS PROVIDO DE AQUISICAO DE FALTA POR ONDAS VIAJANTES PARA AS LINHAS LT VCGM1 E VCGM2 Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | GUAMA | MG 230 kV GUAMA MG1 PA | RB | FT MG 230 kV GUAMA MG1 PA | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 9/11/2013 | 9/14/2043 | R$77,420.00 | 6/1/2025 | Ativa | MODERNIZAÇÃO - ROTEADOR INDUSTRIAL DIGITAL CGR 2010 SECK9 Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | GUAMA | MC 69 kV TR 230/69 kV GUAMA TR3 PA | RBF | FT TR 230/69 kV GUAMA TR3 PA | 058/2001 | IPCA | RBNI | REA 539/2006 | 2/3/2014 | 12/28/2043 | R$83,083.48 | 6/1/2025 | Ativa | T2000-051 | Instalar, na SE Guamá, um módulo de conexão, em 69 kV, para o 3° banco de transformadores TR-3 230/69/13,8 kV - 3x50 MVA *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | GUAMA | MC 69 kV TR 230/69 kV GUAMA TR2 PA | RBF | FT TR 230/69 kV GUAMA TR2 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$66,931.92 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | GUAMA | MC 69 kV TR 230/69 kV GUAMA TR2 PA | RBF | FT TR 230/69 kV GUAMA TR2 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/18/2020 | 6/17/2049 | R$49,744.90 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | GUAMA | MC 69 kV TR 230/69 kV GUAMA TR1 PA | RBF | FT TR 230/69 kV GUAMA TR1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$66,931.92 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | GUAMA | MC 69 kV TR 230/69 kV GUAMA TR1 PA | RBF | FT TR 230/69 kV GUAMA TR1 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/18/2020 | 6/17/2049 | R$49,744.90 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | GUAMA | MC 230 kV TR 230/69 kV GUAMA TR3 PA | RBF | FT TR 230/69 kV GUAMA TR3 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$193,043.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | GUAMA | MC 230 kV TR 230/69 kV GUAMA TR2 PA | RBF | FT TR 230/69 kV GUAMA TR2 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$193,043.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | GUAMA | MC 230 kV TR 230/69 kV GUAMA TR2 PA | RBF | FT TR 230/69 kV GUAMA TR2 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 1/31/2019 | 2/2/2049 | R$21,276.54 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | GUAMA | MC 230 kV TR 230/69 kV GUAMA TR1 PA | RBF | FT TR 230/69 kV GUAMA TR1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$193,043.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | GUAMA | MC 230 kV TR 230/69 kV GUAMA TR1 PA | RBF | FT TR 230/69 kV GUAMA TR1 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 3/25/2020 | 5/20/2046 | R$53,851.85 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | GUAMA | MC 230 kV BC 230 kV 55 Mvar GUAMA BC2 PA | RB | FT BC 230 kV 55 Mvar GUAMA BC2 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$215,364.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | GUAMA | MC 230 kV BC 230 kV 55 Mvar GUAMA BC1 PA | RB | FT BC 230 kV 55 Mvar GUAMA BC1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$215,364.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | GUAMA | IB 230 kV MG 230 kV GUAMA MG1 PA IB1 | RB | FT MG 230 kV GUAMA MG1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$158,618.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | GUAMA | EL 230 kV GUAMA LT 230 kV VILA DO CONDE /GUAMA C-2 PA | RB | FT LT 230 kV VILA DO CONDE /GUAMA C-2 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$269,233.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | GUAMA | EL 230 kV GUAMA LT 230 kV VILA DO CONDE /GUAMA C-2 PA | RB | FT LT 230 kV VILA DO CONDE /GUAMA C-2 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 4/29/2014 | 6/26/2042 | R$98,117.27 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | GUAMA | EL 230 kV GUAMA LT 230 kV VILA DO CONDE /GUAMA C-1 PA | RB | FT LT 230 kV VILA DO CONDE /GUAMA C-1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$269,233.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | GUAMA | EL 230 kV GUAMA LT 230 kV VILA DO CONDE /GUAMA C-1 PA | RB | FT LT 230 kV VILA DO CONDE /GUAMA C-1 PA | 058/2001 | IPCA | RMEL | REN 643/2014 | 7/27/2014 | 7/29/2044 | R$47,863.37 | 6/1/2025 | Ativa | Substituição de 11 TPCs de 230 kV na SE Guamá , sendo 3 substituições neste módulo. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | GUAMA | EL 230 kV GUAMA LT 230 kV GUAMA /MARITUBA C-2 PA | RB | FT LT 230 kV GUAMA /MARITUBA C-2 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$269,233.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | GUAMA | EL 230 kV GUAMA LT 230 kV GUAMA /MARITUBA C-2 PA | RB | FT LT 230 kV GUAMA /MARITUBA C-2 PA | 058/2001 | IPCA | RMEL | REN 643/2014 | 10/14/2015 | 10/16/2045 | R$49,888.03 | 6/1/2025 | Ativa | Substituição de 11 TPCs de 230 kv na SE Guamá , sendo 3 substituições neste módulo. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | GUAMA | EL 230 kV GUAMA LT 230 kV GUAMA /MARITUBA C-2 PA | RB | FT LT 230 kV GUAMA /MARITUBA C-2 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/18/2020 | 11/17/2044 | R$43,433.76 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | GUAMA | EL 230 kV GUAMA LT 230 kV GUAMA /MARITUBA C-1 PA | RB | FT LT 230 kV GUAMA /MARITUBA C-1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$269,233.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | GUAMA | EL 230 kV GUAMA LT 230 kV GUAMA /MARITUBA C-1 PA | RB | FT LT 230 kV GUAMA /MARITUBA C-1 PA | 058/2001 | IPCA | RMEL | REN 643/2014 | 9/14/2014 | 9/16/2044 | R$48,086.72 | 6/1/2025 | Ativa | Substituição de 11 TPCs de 230 kv na SE Guamá , sendo 3 substituições neste módulo. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | GUAMA | EL 230 kV GUAMA LT 230 kV GUAMA /MARITUBA C-1 PA | RB | FT LT 230 kV GUAMA /MARITUBA C-1 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 7/11/2017 | 9/14/2044 | R$69,352.72 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | GUAMA | BC 230 kV 55 Mvar GUAMA BC2 PA | RB | FT BC 230 kV 55 Mvar GUAMA BC2 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$236,675.93 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | GUAMA | BC 230 kV 55 Mvar GUAMA BC1 PA | RB | FT BC 230 kV 55 Mvar GUAMA BC1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$236,675.93 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | GUARAPUAVA OESTE | MG 230 kV GUARAPUAVA OESTE MG2 PR | RB | FT MG 230 kV GUARAPUAVA OESTE MG2 PR | 057/2001 | IPCA | RBNI | DSP 571/2025 | 6/24/2022 | 6/23/2040 | R$71,754.31 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo Geral de Acessante 230 kV na SE Guarapuava Oeste, associado as Entradas de Linha 230 kV para as SEs Areia e Irati Norte, em função do seccionamento da LT 230 kV Areia -Ponta Grossa Norte C1 (também seccionada na SE Irati Norte) na Subestação seccionadora Guarapuava Oeste. | |||
| AXIA Energia Sul | GUARAPUAVA OESTE | MG 230 kV GUARAPUAVA OESTE MG2 PR | RB | FT MG 230 kV GUARAPUAVA OESTE MG2 PR | 057/2001 | IPCA | RBNI | DSP 571/2025 | 6/24/2022 | 6/23/2053 | R$23,288.87 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Módulo de Infraestrutura de Manobra em 230 kV, arranjo Barra Dupla a Quatro Chaves, na Subestação Guarapuava Oeste, associada à Linha de Transmissão 230 kV Areia – Guarapuava Oeste C1. | |||
| AXIA Energia Sul | GUARAPUAVA OESTE | MG 230 kV GUARAPUAVA OESTE MG2 PR | RB | FT MG 230 kV GUARAPUAVA OESTE MG2 PR | 057/2001 | IPCA | RBNI | DSP 571/2025 | 6/24/2022 | 6/23/2053 | R$23,288.87 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Módulo de Infraestrutura de Manobra em 230 kV, arranjo Barra Dupla a Quatro Chaves, na Subestação Guarapuava Oeste, associada à Linha de Transmissão 230 kV Guarapuava Oeste – Irati Norte C1. | |||
| AXIA Energia Sul | GUARAPUAVA OESTE | EL 230 kV GUARAPUAVA OESTE LT 230 kV GUARAPUAVA OESTE /IRATI NORTE C-1 PR | RB | FT LT 230 kV GUARAPUAVA OESTE /IRATI NORTE C-1 PR | 057/2001 | IPCA | RBNI | DSP 571/2025 | 6/24/2022 | 6/23/2050 | R$205,057.10 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo Barra Dupla a Quatro Chaves, na Subestação Guarapuava Oeste, associada à Linha de Transmissão 230 kV Guarapuava Oeste – IratiNorte C1. | |||
| AXIA Energia Sul | GUARAPUAVA OESTE | EL 230 kV GUARAPUAVA OESTE LT 230 kV AREIA /GUARAPUAVA OESTE C-1 PR | RB | FT LT 230 kV AREIA /GUARAPUAVA OESTE C-1 PR | 057/2001 | IPCA | RBNI | DSP 571/2025 | 6/24/2022 | 6/23/2050 | R$205,057.10 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo Barra Dupla a Quatro Chaves, na Subestação Guarapuava Oeste, associada à Linha de Transmissão 230 kV Areia – Guarapuava Oeste C1. | |||
| AXIA Energia Sul | GUARITA | MG 230 kV GUARITA MG2 RS | RB | FT MG 230 kV GUARITA MG2 RS | 002/2011 | IPCA | RBNI | REA 6427/2017 | 10/28/2016 | 6/15/2041 | R$10,920.66 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de modulo de infraestrutura de manobra da entrada da linha 230 kV Foz do Chapecó - Guarita, da FCE para a Eletrosul. *(Receita revisada em 21/06/2021) | |||
| AXIA Energia Sul | GUARITA | EL 230 kV GUARITA LT 230 kV FOZ DO CHAPECO /GUARITA C-1 RS | RB | FT LT 230 kV FOZ DO CHAPECO /GUARITA C-1 RS | 002/2011 | IPCA | RBNI | REA 6427/2017 | 10/28/2016 | 6/15/2041 | R$151,319.24 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla a quatro chaves, na subestação Guarita, associada à linha de transmissão 230 kV Foz do Chapecó - Guarita. *(Receita revisada em 21/06/2021) | |||
| AXIA Energia | GUARULHOS | RTB 345 kV 44 Mvar GUARULHOS RTR2 SP | RB | FT RTB 345 kV 44 Mvar GUARULHOS RTR2 SP | 062/2001 | IPCA | RBNIA | REA 15125/2024 | R$597,546.53 | 6/1/2025 | Prevista | T2024-004 | Instalação de uma fase reserva para o RT2, 345 kV, 44MVar, na SE Guarulhos. | ||||
| AXIA Energia | GUARULHOS | RTB 345 kV 44 Mvar GUARULHOS RTR1 SP | RB | FT RTB 345 kV 44 Mvar GUARULHOS RTR1 SP | 062/2001 | IPCA | RBNIA | REA 15125/2024 | R$597,546.53 | 6/1/2025 | Prevista | T2024-002 | Instalação de uma fase reserva para o RT1, 345 kV, 44MVar, na SE Guarulhos | ||||
| AXIA Energia | GUARULHOS | RTB 345 kV 132 Mvar GUARULHOS RT2 SP | RB | FT RTB 345 kV 132 Mvar GUARULHOS RT2 SP | 062/2001 | IPCA | RBNIA | REA 15125/2024 | R$ 1,792,639.60 | 6/1/2025 | Prevista | T2024-003 | Instalação do segundo banco de reatores de barras, 345 kV, 3x44MVar, na SE Guarulhos - RT2 | ||||
| AXIA Energia | GUARULHOS | RTB 345 kV 132 Mvar GUARULHOS RT1 SP | RB | FT RTB 345 kV 132 Mvar GUARULHOS RT1 SP | 062/2001 | IPCA | RBNIA | REA 15125/2024 | R$ 1,792,639.60 | 6/1/2025 | Prevista | T2024-001 | Instalação do primeiro banco de reatores de barras, 345 kV, 3x44MVar, na SE Guarulhos - RT1 | ||||
| AXIA Energia | GUARULHOS | MG 345 kV GUARULHOS MG1 SP | RB | FT MG 345 kV GUARULHOS MG1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$899,246.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GUARULHOS | MG 345 kV GUARULHOS MG1 SP | RB | FT MG 345 kV GUARULHOS MG1 SP | 062/2001 | IPCA | RBNI | REA 4347/2013 | 1/18/2016 | 4/11/2042 | R$4,492.72 | 6/1/2025 | Ativa | Substituição de RDP 345 kV Barra 345 kV - A Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GUARULHOS | MG 345 kV GUARULHOS MG1 SP | RB | FT MG 345 kV GUARULHOS MG1 SP | 062/2001 | IPCA | RBNI | REA 4347/2013 | 1/18/2016 | 4/11/2042 | R$5,391.27 | 6/1/2025 | Ativa | Substituição de RDP 345 kV Barra 345 kV - B Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GUARULHOS | MG 345 kV GUARULHOS MG1 SP | RB | FT MG 345 kV GUARULHOS MG1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,450,746.19 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GUARULHOS | MG 345 kV GUARULHOS MG1 SP | RB | FT MG 345 kV GUARULHOS MG1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 3,699,384.64 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GUARULHOS | MG 345 kV GUARULHOS MG1 SP | RB | FT MG 345 kV GUARULHOS MG1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/31/2017 | 3/27/2033 | R$ 647.02 | 6/1/2025 | Ativa | Substituição de IHMs do Sistema de Supervisão e Controle Local (SAGE) por obsolescência ou por atualização tecnológica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GUARULHOS | MG 345 kV GUARULHOS MG1 SP | RB | FT MG 345 kV GUARULHOS MG1 SP | 062/2001 | IPCA | RBNI | REA 5861/2016 | 12/21/2017 | 2/15/2035 | R$33,444.53 | 6/1/2025 | Ativa | Adequação nos Serviços auxiliares de corrente contínua (CC) do sistema de telecomunicações, visando aumento de confiabilidade e disponibilidade, como consequencia o aumento da segurança operacional do SIN * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 * Receita alterada no recurso contra a REH 2.407/2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GUARULHOS | MG 345 kV GUARULHOS MG1 SP | RB | FT MG 345 kV GUARULHOS MG1 SP | 062/2001 | IPCA | RBNIA | REA 15125/2024 | R$572,158.02 | 6/1/2025 | Prevista | T2024-001 | Módulo de infraestrutura associado ao RT1, 345 kV, na SE Guarulhos | ||||
| AXIA Energia | GUARULHOS | MG 345 kV GUARULHOS MG1 SP | RB | FT MG 345 kV GUARULHOS MG1 SP | 062/2001 | IPCA | RBNIA | REA 15125/2024 | R$572,158.02 | 6/1/2025 | Prevista | T2024-003 | Módulo de infraestrutura associado ao RT2, 345 kV, BD5, na SE Guarulhos | ||||
| AXIA Energia | GUARULHOS | MG 345 kV GUARULHOS MG1 SP | RB | FT MG 345 kV GUARULHOS MG1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/12/2021 | 6/23/2046 | R$ 1,571,316.53 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | GUARULHOS | MC 345 kV RTB 345 kV 132 Mvar GUARULHOS RT2 SP | RB | FT RTB 345 kV 132 Mvar GUARULHOS RT2 SP | 062/2001 | IPCA | RBNIA | REA 15125/2024 | R$ 3,352,121.71 | 6/1/2025 | Prevista | T2024-003 | Instalação de uma conexão para o RT2, 345 kV, na SE Guarulhos | ||||
| AXIA Energia | GUARULHOS | MC 345 kV RTB 345 kV 132 Mvar GUARULHOS RT1 SP | RB | FT RTB 345 kV 132 Mvar GUARULHOS RT1 SP | 062/2001 | IPCA | RBNIA | REA 15125/2024 | R$ 3,371,199.13 | 6/1/2025 | Prevista | T2024-001 | Instalação de uma conexão para o RT1, 345 kV, BD5, na SE Guarulhos | ||||
| AXIA Energia | GUARULHOS | MC 345 kV BC 345 kV 150 Mvar GUARULHOS BC2 SP | RB | FT BC 345 kV 150 Mvar GUARULHOS BC2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$237,734.88 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GUARULHOS | MC 345 kV BC 345 kV 100 Mvar GUARULHOS BC1 SP | RB | FT BC 345 kV 100 Mvar GUARULHOS BC1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$237,734.88 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GUARULHOS | IB 345 kV MG 345 kV GUARULHOS MG1 SP IB1 | RB | FT MG 345 kV GUARULHOS MG1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GUARULHOS | IB 345 kV MG 345 kV GUARULHOS MG1 SP IB1 | RB | FT MG 345 kV GUARULHOS MG1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/20/2020 | 5/21/2053 | R$385,334.57 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV NORTE /GUARULHOS C-2 SP | RB | FT LT 345 kV NORTE /GUARULHOS C-2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV NORTE /GUARULHOS C-2 SP | RB | FT LT 345 kV NORTE /GUARULHOS C-2 SP | 062/2001 | IPCA | RBNI | REA 4347/2013 | 1/18/2016 | 4/11/2042 | R$4,492.72 | 6/1/2025 | Ativa | Substituição de RDP 345 kV LI 345 kV Terminal Norte C2 Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV NORTE /GUARULHOS C-2 SP | RB | FT LT 345 kV NORTE /GUARULHOS C-2 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,229,990.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV NORTE /GUARULHOS C-2 SP | RB | FT LT 345 kV NORTE /GUARULHOS C-2 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/15/2021 | 11/23/2052 | R$218,828.84 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV NORTE /GUARULHOS C-1 SP | RB | FT LT 345 kV NORTE /GUARULHOS C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV NORTE /GUARULHOS C-1 SP | RB | FT LT 345 kV NORTE /GUARULHOS C-1 SP | 062/2001 | IPCA | RBNI | REA 4347/2013 | 1/18/2016 | 4/11/2042 | R$4,492.72 | 6/1/2025 | Ativa | Substituição de RDP 345 kV LI 345 kV Terminal Norte C1 Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV NORTE /GUARULHOS C-1 SP | RB | FT LT 345 kV NORTE /GUARULHOS C-1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,229,990.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV NORTE /GUARULHOS C-1 SP | RB | FT LT 345 kV NORTE /GUARULHOS C-1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 4/28/2021 | 3/8/2054 | R$268,951.82 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG | RB | FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG | RB | FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/27/2015 | 10/19/2040 | R$5,636.86 | 6/1/2025 | Ativa | Substituição de trechos dos barramentos onde estão conectadas as LTs 345 kV Poços de Caldas C1 e C2, Campinas e Terminal Nordeste. Reforço de Pequeno Porte reconhecido no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG | RB | FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG | 062/2001 | IPCA | RBNI | REA 4347/2013 | 1/18/2016 | 4/11/2042 | R$5,391.27 | 6/1/2025 | Ativa | Substituição de RDP 345 kV LT 345 kV Poços de Caldas C2 Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG | RB | FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG | 062/2001 | IPCA | RBNI | REA 5484/2015 | 10/2/2017 | 2/8/2048 | R$87,121.06 | 6/1/2025 | Ativa | Substituição de 3 TC do vão Poços C2 (DJ8062) 345 kV * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 * Receita alterada no recurso contra a REH 2.407/2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG | RB | FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/4/2021 | 3/3/2045 | R$50,238.64 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG | RB | FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG | RB | FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/27/2015 | 4/3/2049 | R$70,426.76 | 6/1/2025 | Ativa | Substituição de trechos dos barramentos onde estão conectadas as LTs 345 kV Poços de Caldas C1 e C2, Campinas e Terminal Nordeste. Reforço de Pequeno Porte reconhecido no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG | RB | FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RBNI | REA 4347/2013 | 1/18/2016 | 4/11/2042 | R$5,391.27 | 6/1/2025 | Ativa | Substituição de RDP 345 kV LT 345 kV Poços de Caldas C1 Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG | RB | FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RBNI | REA 5484/2015 | 10/2/2017 | 2/8/2048 | R$87,121.06 | 6/1/2025 | Ativa | Substituição de 3 TC do vão Poços C1 (DJ8052) 345 kV * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG | RB | FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/4/2021 | 3/3/2045 | R$50,238.64 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV GUARULHOS /NORDESTE C-1 SP | RB | FT LT 345 kV GUARULHOS /NORDESTE C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV GUARULHOS /NORDESTE C-1 SP | RB | FT LT 345 kV GUARULHOS /NORDESTE C-1 SP | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/27/2015 | 4/3/2049 | R$70,426.76 | 6/1/2025 | Ativa | Substituição de trechos dos barramentos onde estão conectadas as LTs 345 kV Poços de Caldas C1 e C2, Campinas e Terminal Nordeste. Reforço de Pequeno Porte reconhecido no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV GUARULHOS /NORDESTE C-1 SP | RB | FT LT 345 kV GUARULHOS /NORDESTE C-1 SP | 062/2001 | IPCA | RBNI | REA 4347/2013 | 1/18/2016 | 4/11/2042 | R$5,391.27 | 6/1/2025 | Ativa | Substituição de RDP 345 kV LI 345 kV Terminal Nordeste Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV GUARULHOS /NORDESTE C-1 SP | RB | FT LT 345 kV GUARULHOS /NORDESTE C-1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,229,990.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV GUARULHOS /NORDESTE C-1 SP | RB | FT LT 345 kV GUARULHOS /NORDESTE C-1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,318,615.67 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV GUARULHOS /NORDESTE C-1 SP | RB | FT LT 345 kV GUARULHOS /NORDESTE C-1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/4/2021 | 3/3/2045 | R$50,238.64 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV GUARULHOS /IBIUNA C-2 SP | RB | FT LT 345 kV GUARULHOS /IBIUNA C-2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV GUARULHOS /IBIUNA C-2 SP | RB | FT LT 345 kV GUARULHOS /IBIUNA C-2 SP | 062/2001 | IPCA | RBNI | REA 4347/2013 | 1/18/2016 | 4/11/2042 | R$4,492.72 | 6/1/2025 | Ativa | Substituição de RDP 345 kV LT 345 kV Ibiúna C2 Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV GUARULHOS /IBIUNA C-2 SP | RB | FT LT 345 kV GUARULHOS /IBIUNA C-2 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,229,990.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV GUARULHOS /IBIUNA C-2 SP | RB | FT LT 345 kV GUARULHOS /IBIUNA C-2 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/9/2020 | 7/30/2049 | R$681,286.50 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV GUARULHOS /IBIUNA C-1 SP | RB | FT LT 345 kV GUARULHOS /IBIUNA C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV GUARULHOS /IBIUNA C-1 SP | RB | FT LT 345 kV GUARULHOS /IBIUNA C-1 SP | 062/2001 | IPCA | RBNI | REA 4347/2013 | 1/18/2016 | 4/11/2042 | R$4,492.72 | 6/1/2025 | Ativa | Substituição de RDP 345 kV LT 345 kV Ibiúna C1 Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV GUARULHOS /IBIUNA C-1 SP | RB | FT LT 345 kV GUARULHOS /IBIUNA C-1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,229,990.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV GUARULHOS /IBIUNA C-1 SP | RB | FT LT 345 kV GUARULHOS /IBIUNA C-1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 9/5/2019 | 3/12/2048 | R$716,825.42 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV CAMPINAS /GUARULHOS C-1 SP | RB | FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV CAMPINAS /GUARULHOS C-1 SP | RB | FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/27/2015 | 4/3/2049 | R$70,426.76 | 6/1/2025 | Ativa | Substituição de trechos dos barramentos onde estão conectadas as LTs 345 kV Poços de Caldas C1 e C2, Campinas e Terminal Nordeste. Reforço de Pequeno Porte reconhecido no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV CAMPINAS /GUARULHOS C-1 SP | RB | FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP | 062/2001 | IPCA | RBNI | REA 4347/2013 | 1/18/2016 | 4/11/2042 | R$4,492.72 | 6/1/2025 | Ativa | Substituição de RDP 345 kV LT 345 kV Campinas Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV CAMPINAS /GUARULHOS C-1 SP | RB | FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP | 062/2001 | IPCA | RBNI | REA 5484/2015 | 11/4/2015 | 11/28/2033 | R$33,982.73 | 6/1/2025 | Ativa | Substituição de 2 bobinas de bloqueio do vão Campinas (DJ8042) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV CAMPINAS /GUARULHOS C-1 SP | RB | FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP | 062/2001 | IPCA | RBNI | REA 5484/2015 | 11/27/2018 | 12/15/2048 | R$99,813.68 | 6/1/2025 | Ativa | Substituição de 3 TC do vão Campinas (DJ8042) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GUARULHOS | EL 345 kV GUARULHOS LT 345 kV CAMPINAS /GUARULHOS C-1 SP | RB | FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 9/18/2016 | 5/29/2037 | R$112,428.46 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | GUARULHOS | BC 345 kV 150 Mvar GUARULHOS BC2 SP | RB | FT BC 345 kV 150 Mvar GUARULHOS BC2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$281,257.76 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GUARULHOS | BC 345 kV 100 Mvar GUARULHOS BC1 SP | RB | FT BC 345 kV 100 Mvar GUARULHOS BC1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$248,017.36 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GURUPI | RTN 69 kV 0 Mvar GURUPI RTNSM1 TO | RB | FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$13,169.55 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GURUPI | RTN 69 kV 0 Mvar GURUPI RTNMI1 TO | RB | FT LT 500 kV GURUPI /MIRACEMA C-1 TO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$13,169.55 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GURUPI | RTL 500 kV 55 Mvar GURUPI RTR3 TO | RB | FT RTL 500 kV 55 Mvar GURUPI RTR3 TO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$238,758.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GURUPI | RTL 500 kV 55 Mvar GURUPI RTR2 TO | RB | FT RTL 500 kV 55 Mvar GURUPI RTR2 TO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$238,758.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GURUPI | RTL 500 kV 136 Mvar GURUPI RSM1 TO | RB | FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$715,674.32 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GURUPI | RTL 500 kV 136 Mvar GURUPI RSM1 TO | RB | FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,746,312.33 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GURUPI | RTL 500 kV 136 Mvar GURUPI RSM1 TO | RB | FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,944,193.83 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GURUPI | RTL 500 kV 136 Mvar GURUPI RMI1 TO | RB | FT LT 500 kV GURUPI /MIRACEMA C-1 TO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$715,674.32 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GURUPI | RTL 500 kV 136 Mvar GURUPI RMI1 TO | RB | FT LT 500 kV GURUPI /MIRACEMA C-1 TO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,746,312.33 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GURUPI | RTL 500 kV 136 Mvar GURUPI RMI1 TO | RB | FT LT 500 kV GURUPI /MIRACEMA C-1 TO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,944,193.83 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GURUPI | MG 500 kV GURUPI MG2 TO | RB | FT MG 500 kV GURUPI MG2 TO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$676,835.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GURUPI | MG 500 kV GURUPI MG2 TO | RB | FT MG 500 kV GURUPI MG2 TO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,597,272.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GURUPI | MG 500 kV GURUPI MG2 TO | RB | FT MG 500 kV GURUPI MG2 TO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,784,415.17 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GURUPI | MG 500 kV GURUPI MG2 TO | RB | FT MG 500 kV GURUPI MG2 TO | 062/2001 | IPCA | RBNI | REA 6370/2017 | 11/11/2020 | 5/30/2047 | R$47,688.48 | 6/1/2025 | Ativa | T2017-014 | Modulo de Infra-estrutura de Manobra(500 kV-DJM) referente a substituição de BCS na LT Gurupi - Miracema C1 *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | GURUPI | MG 500 kV GURUPI MG2 TO | RB | FT MG 500 kV GURUPI MG2 TO | 062/2001 | IPCA | RBNI | REA 6370/2017 | 11/18/2020 | 3/30/2049 | R$24,484.25 | 6/1/2025 | Ativa | T2017-015 | Modulo de Infra-estrutura de Manobra - adequação para substituição de BCS na LT Gurupi - S. Mesa C1 *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | GURUPI | MG 500 kV GURUPI MG2 TO | RB | FT MG 500 kV GURUPI MG2 TO | 062/2001 | IPCA | RMEL | REN 443/2011 | 4/25/2017 | 10/21/2031 | R$123,124.27 | 6/1/2025 | Ativa | Substituição de MULTIPLEX ADM SDH MULTIPLEX ADM SDH * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GURUPI | MG 500 kV GURUPI MG2 TO | RB | FT MG 500 kV GURUPI MG2 TO | 062/2001 | IPCA | RMEL | REN 443/2011 | 4/25/2017 | 10/21/2031 | R$121,420.82 | 6/1/2025 | Ativa | Substituição de MULTIPLEX ADM SDH MULTIPLEX ADM SDH * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GURUPI | MG 500 kV GURUPI MG2 TO | RB | FT MG 500 kV GURUPI MG2 TO | 062/2001 | IPCA | RBNI | REA 5861/2016 | 9/13/2017 | 8/9/2034 | R$37,501.15 | 6/1/2025 | Ativa | Adequação - Serviços auxiliares de corrente contínua (CC) do sistema de telecomunicações CCO-2001-062 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 * Receita alterada no recurso contra a REH 2.407/2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | GURUPI | MC 500 kV RTL 500 kV 136 Mvar GURUPI RSM1 TO | RB | FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,673.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GURUPI | MC 500 kV RTL 500 kV 136 Mvar GURUPI RMI1 TO | RB | FT LT 500 kV GURUPI /MIRACEMA C-1 TO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,673.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GURUPI | MC 500 kV CR 500 kV 361,5 Mvar GURUPI BC3 TO | RB | FT CR 500 kV 361,5 Mvar GURUPI BC3 TO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,400.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GURUPI | MC 500 kV CR 500 kV 361,5 Mvar GURUPI BC3 TO | RB | FT CR 500 kV 361,5 Mvar GURUPI BC3 TO | 062/2001 | IPCA | RBNI | REA 6370/2017 | 11/11/2020 | 6/24/2051 | R$208,998.08 | 6/1/2025 | Ativa | T2017-014 | ADEQUAÇÃO DO MODULO DE CONEXÃO DO BANCO CAPACITOR SERIE BC3 NA SE GURUPI REFERENTE A LT GURUPI-MIRACEMA C1 *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | GURUPI | MC 500 kV CR 500 kV 285,6 Mvar GURUPI BC1 TO | RB | FT CR 500 kV 285,6 Mvar GURUPI BC1 TO | 062/2001 | IPCA | RBNI | REA 6370/2017 | 11/17/2020 | 9/7/2051 | R$237,942.67 | 6/1/2025 | Ativa | T2017-015 | Modulo de conexão do BC1 500 kV DJM na SE Gurupi - LT Gurupi - S Mesa C1 *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | GURUPI | IB 500 kV MG 500 kV GURUPI MG2 TO IB2 | RB | FT MG 500 kV GURUPI MG2 TO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GURUPI | EL 500 kV GURUPI LT 500 kV S.DA MESA /GURUPI C-1 GO/TO | RB | FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GURUPI | EL 500 kV GURUPI LT 500 kV S.DA MESA /GURUPI C-1 GO/TO | RB | FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,720,019.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GURUPI | EL 500 kV GURUPI LT 500 kV S.DA MESA /GURUPI C-1 GO/TO | RB | FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,843,952.51 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GURUPI | EL 500 kV GURUPI LT 500 kV GURUPI /MIRACEMA C-1 TO | RB | FT LT 500 kV GURUPI /MIRACEMA C-1 TO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GURUPI | EL 500 kV GURUPI LT 500 kV GURUPI /MIRACEMA C-1 TO | RB | FT LT 500 kV GURUPI /MIRACEMA C-1 TO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,720,019.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GURUPI | EL 500 kV GURUPI LT 500 kV GURUPI /MIRACEMA C-1 TO | RB | FT LT 500 kV GURUPI /MIRACEMA C-1 TO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,843,952.51 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | GURUPI | CR 500 kV 361,5 Mvar GURUPI BC3 TO | RB | FT CR 500 kV 361,5 Mvar GURUPI BC3 TO | 062/2001 | IPCA | RBNI | REA 6370/2017 | 11/11/2020 | 12/25/2040 | R$ 4,881,410.61 | 6/1/2025 | Ativa | T2017-014 | Obra de Substituição Completa - Substituição de BCS referente a LT Gurupi - Miracema C1 por BCS 500 kV In=2250A e P=361MVAr *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | GURUPI | CR 500 kV 285,6 Mvar GURUPI BC1 TO | RB | FT CR 500 kV 285,6 Mvar GURUPI BC1 TO | 062/2001 | IPCA | RBNI | REA 6370/2017 | 11/17/2020 | 11/30/2040 | R$ 5,878,118.04 | 6/1/2025 | Ativa | T2017-015 | Obra de Substituição Completa - Substituição de BCS 500 kV na SE Gurupi - LT Gurupi - Serra da Mesa C1 por um BCS 500 kV P=286 Mvar e IN = 2.000 A *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | IBIAPINA II | TT 69/69 kV IBIAPINA II TA1 CE | ICG | 010/2011 | IPCA | RICG | CC 010/2011 | 9/12/2016 | 9/18/2034 | R$199,999.61 | 6/1/2025 | Ativa | T2012-032-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | IBIAPINA II | TR 230/69 kV IBIAPINA II TR2 CE | ICG | 010/2011 | IPCA | RICG | CC 010/2011 | 9/12/2016 | 9/18/2034 | R$994,856.43 | 6/1/2025 | Ativa | T2012-032-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | IBIAPINA II | TR 230/69 kV IBIAPINA II TR1 CE | ICG | 010/2011 | IPCA | RICG | CC 010/2011 | 9/12/2016 | 9/18/2034 | R$994,856.43 | 6/1/2025 | Ativa | T2012-032-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | IBIAPINA II | MG 230 kV IBIAPINA II MG1 CE | RB | FT MG 230 kV IBIAPINA II MG1 CE | 010/2011 | IPCA | RBNI | REN 905/2020 | 10/21/2021 | 10/20/2052 | R$40,211.52 | 6/1/2025 | Ativa | MIM ASSOCIADO: Implantação de um módulo de Entrada de Linha em 69kV, arranjo barra principal e transferência, com destino à SE Tianguá na SE IBIAPINA II - 02S1. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 | |||
| AXIA Energia Nordeste | IBIAPINA II | MG 230 kV IBIAPINA II MG1 CE | RB | FT MG 230 kV IBIAPINA II MG1 CE | 010/2011 | IPCA | RBNI | REN 905/2020 | 10/21/2021 | 10/20/2052 | R$40,211.52 | 6/1/2025 | Ativa | MIM ASSOCIADO: Implantação de um módulo de Entrada de Linha em 69kV, arranjo barra principal e transferência, com destino à SE Ibiapina na SE IBIAPINA II - 02S2. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 | |||
| AXIA Energia Nordeste | IBIAPINA II | MG 230 kV IBIAPINA II MG1 CE | RB | FT MG 230 kV IBIAPINA II MG1 CE | 010/2011 | IPCA | RBL | CC 010/2011 | 9/12/2016 | 10/13/2041 | R$943,109.83 | 6/1/2025 | Ativa | T2012-032-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IBIAPINA II | MC 69 kV TT 69/69 kV IBIAPINA II TA1 CE | ICG | 010/2011 | IPCA | RICG | CC 010/2011 | 9/12/2016 | 9/18/2034 | R$74,453.05 | 6/1/2025 | Ativa | T2012-032-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | IBIAPINA II | MC 69 kV TR 230/69 kV IBIAPINA II TR2 CE | ICG | 010/2011 | IPCA | RICG | CC 010/2011 | 9/12/2016 | 9/18/2034 | R$176,411.41 | 6/1/2025 | Ativa | T2012-032-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | IBIAPINA II | MC 69 kV TR 230/69 kV IBIAPINA II TR1 CE | ICG | 010/2011 | IPCA | RICG | CC 010/2011 | 9/12/2016 | 9/18/2034 | R$176,411.41 | 6/1/2025 | Ativa | T2012-032-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | IBIAPINA II | MC 69 kV BC 69 kV 21,3 Mvar IBIAPINA II BC1 CE | ICG | 010/2011 | IPCA | RICG | CC 010/2011 | 9/12/2016 | 9/18/2034 | R$213,471.25 | 6/1/2025 | Ativa | T2012-032-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | IBIAPINA II | MC 230 kV TR 230/69 kV IBIAPINA II TR2 CE | ICG | 010/2011 | IPCA | RICG | CC 010/2011 | 9/12/2016 | 9/18/2034 | R$433,710.38 | 6/1/2025 | Ativa | T2012-032-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | IBIAPINA II | MC 230 kV TR 230/69 kV IBIAPINA II TR1 CE | ICG | 010/2011 | IPCA | RICG | CC 010/2011 | 9/12/2016 | 9/18/2034 | R$433,710.38 | 6/1/2025 | Ativa | T2012-032-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | IBIAPINA II | IB 69 kV MG 230 kV IBIAPINA II MG1 CE IB1 | ICG | 010/2011 | IPCA | RICG | CC 010/2011 | 9/12/2016 | 9/18/2034 | R$120,943.46 | 6/1/2025 | Ativa | T2012-032-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | IBIAPINA II | IB 230 kV MG 230 kV IBIAPINA II MG1 CE IB1 | RB | FT MG 230 kV IBIAPINA II MG1 CE | 010/2011 | IPCA | RBL | CC 010/2011 | 9/12/2016 | 10/13/2041 | R$333,089.20 | 6/1/2025 | Ativa | T2012-032-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IBIAPINA II | EL 69 kV IBIAPINA II DIST2 | DIT | 010/2011 | IPCA | RCDM | REN 905/2020 | 10/21/2021 | 10/20/2049 | R$522,582.01 | 6/1/2025 | Ativa | Implantação de um módulo de Entrada de Linha em 69kV, arranjo barra principal e transferência, com destino à SE Ibiapina na SE IBIAPINA II - 02S2. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 | ||||
| AXIA Energia Nordeste | IBIAPINA II | EL 69 kV IBIAPINA II DIST1 | DIT | 010/2011 | IPCA | RCDM | REN 905/2020 | 10/21/2021 | 10/20/2049 | R$522,582.01 | 6/1/2025 | Ativa | Implantação de um módulo de Entrada de Linha em 69kV, arranjo barra principal e transferência, com destino à SE Tianguá na SE IBIAPINA II - 02S1. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 | ||||
| NOVA ERA TERESINA | IBIAPINA II | EL 230 kV IBIAPINA II LT 230 kV PIRIPIRI /IBIAPINA II C-3 PI/CE | RB | FT LT 230 kV PIRIPIRI /IBIAPINA II C-3 PI/CE | 004/2024 | IPCA | RBL | CC 004/2024 | R$ 1,246,903.10 | 6/1/2025 | Prevista | T2024-193-B | LT 230kV Ibiapina II – Piripiri C3 | ||||
| AXIA Energia Nordeste | IBIAPINA II | EL 230 kV IBIAPINA II LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE | RB | FT LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE | 061/2001 | IPCA | RBNI | REA 10142/2021 | 2/10/2021 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Ibiapina II, associada à linha de transmissão 230 kV Ibiapina II – Piripiri. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | IBIAPINA II | EL 230 kV IBIAPINA II LT 230 kV IBIAPINA II /SOBRAL II C-1 CE | RB | FT LT 230 kV IBIAPINA II /SOBRAL II C-1 CE | 061/2001 | IPCA | RBNI | REA 10142/2021 | 2/10/2021 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Ibiapina II, associada à linha de transmissão 230 kV Sobral II – Ibiapina II. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | IBIAPINA II | BC 69 kV 21,3 Mvar IBIAPINA II BC1 CE | ICG | 010/2011 | IPCA | RICG | CC 010/2011 | 9/12/2016 | 9/18/2034 | R$312,751.96 | 6/1/2025 | Ativa | T2012-032-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | IBICOARA | TR 500/230 kV IBICOARA TRR1 BA | RB | FT TR 500/230 kV IBICOARA TRR1 BA | 010/2007 | IPCA | RBL | CC 010/2007 | 6/11/2007 | 6/11/2037 | R$717,259.55 | 6/1/2025 | Ativa | T2000-115 | Contrato de Concessão nº 010/2007 *(Considera adicional de RGR relativo à prorrogação do encargo. Receita revisada em 19/06/2012 no reajuste para o Ciclo 2012-2013. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IBICOARA | TR 500/230 kV IBICOARA TR3 BA | RB | FT TR 500/230 kV IBICOARA TR3 BA | 010/2007 | IPCA | RBNI | REA 5211/2015 | 6/10/2019 | 6/9/2053 | R$ 4,555,534.45 | 6/1/2025 | Ativa | T2015-018 | Instalação, na Subestação Ibicoara, do segundo banco de autotransformadores 500/230 kV, de 3 x 100 MVA. *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | IBICOARA | TR 500/230 kV IBICOARA TR1 BA | RB | FT TR 500/230 kV IBICOARA TR1 BA | 010/2007 | IPCA | RBL | CC 010/2007 | 6/11/2007 | 6/11/2037 | R$ 2,151,778.65 | 6/1/2025 | Ativa | T2000-115 | Contrato de Concessão nº 010/2007 *(Considera adicional de RGR relativo à prorrogação do encargo. Receita revisada em 19/06/2012 no reajuste para o Ciclo 2012-2013. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IBICOARA | TR 230/138 kV IBICOARA TR3 BA | RBF | FT TR 230/138 kV IBICOARA TR3 BA | 010/2007 | IPCA | RBNIA | DSP 3602/2024 | R$ 1,566,293.91 | 6/1/2025 | Prevista | T2024-230 | Instalar, na SE IBICOARA, de uma transformação trifásica TR3 230/138-13,8 KV - 100 MVA. | ||||
| AXIA Energia Nordeste | IBICOARA | TR 230/138 kV IBICOARA TR2 BA | RBF | FT TR 230/138 kV IBICOARA TR2 BA | 010/2007 | IPCA | RBL | CC 010/2007 | 6/11/2007 | 6/11/2037 | R$371,929.35 | 6/1/2025 | Ativa | T2000-115 | Contrato de Concessão nº 010/2007 *(Considera adicional de RGR relativo à prorrogação do encargo. Receita revisada em 19/06/2012 no reajuste para o Ciclo 2012-2013. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IBICOARA | TR 230/138 kV IBICOARA TR1 BA | RBF | FT TR 230/138 kV IBICOARA TR1 BA | 010/2007 | IPCA | RBL | CC 010/2007 | 6/11/2007 | 6/11/2037 | R$371,929.35 | 6/1/2025 | Ativa | T2000-115 | Contrato de Concessão nº 010/2007 *(Considera adicional de RGR relativo à prorrogação do encargo. Receita revisada em 19/06/2012 no reajuste para o Ciclo 2012-2013. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IBICOARA | MG 500 kV IBICOARA MG4 BA | RB | FT MG 500 kV IBICOARA MG4 BA | 061/2001 | IPCA | RBNI | REA 7761/2019 | 9/30/2015 | 11/26/2030 | R$19,348.96 | 6/1/2025 | Ativa | Implantação de Sistema para acesso remoto a dispositivos de Proteção, Controle e Automação. Sistema composto de Painel com PCs Industriais (1 Concentrador, 1 Firewall, 1 Receptor GPS, 3 Switchs Gerenciáveis) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | IBICOARA | MG 500 kV IBICOARA MG4 BA | RB | FT MG 500 kV IBICOARA MG4 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/17/2022 | 3/20/2038 | R$136,264.63 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | IBICOARA | MG 500 kV IBICOARA MG2 BA | RB | FT MG 500 kV IBICOARA MG2 BA | 010/2007 | IPCA | RBNI | REA 5211/2015 | 6/10/2019 | 6/9/2048 | R$149,028.52 | 6/1/2025 | Ativa | T2015-018 | Complementação do módulo geral da na Subestação Ibicoara com um módulo de infraestrutura de manobra em 230 kV. *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | IBICOARA | MG 500 kV IBICOARA MG2 BA | RB | FT MG 500 kV IBICOARA MG2 BA | 010/2007 | IPCA | RBNIA | DSP 3602/2024 | R$96,281.61 | 6/1/2025 | Prevista | T2024-230 | Módulo de Infraestrutura em 138 kV associado ao TR3 | ||||
| AXIA Energia Nordeste | IBICOARA | MG 500 kV IBICOARA MG2 BA | RB | FT MG 500 kV IBICOARA MG2 BA | 010/2007 | IPCA | RBNIA | DSP 3602/2024 | R$150,520.47 | 6/1/2025 | Prevista | T2024-230 | Módulo de Infraestrutura em 230 kV associado ao TR3 | ||||
| AXIA Energia Nordeste | IBICOARA | MC 500 kV TR 500/230 kV IBICOARA TR3 BA | RB | FT TR 500/230 kV IBICOARA TR3 BA | 010/2007 | IPCA | RBNI | REA 5211/2015 | 6/10/2019 | 6/9/2051 | R$ 2,353,090.48 | 6/1/2025 | Ativa | T2015-018 | Instalação, na Subestação Ibicoara, de um módulo de conexão, em 500 kV, para o segundo banco de autotransformadores 500/230 kV, de 3 x 100 MVA. *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | IBICOARA | MC 500 kV TR 500/230 kV IBICOARA TR1 BA | RB | FT TR 500/230 kV IBICOARA TR1 BA | 010/2007 | IPCA | RBL | CC 010/2007 | 6/11/2007 | 6/11/2037 | R$ 1,111,579.90 | 6/1/2025 | Ativa | T2000-115 | Contrato de Concessão nº 010/2007 *(Considera adicional de RGR relativo à prorrogação do encargo. Receita revisada em 19/06/2012 no reajuste para o Ciclo 2012-2013. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IBICOARA | MC 500 kV TR 500/230 kV IBICOARA TR1 BA | RB | FT TR 500/230 kV IBICOARA TR1 BA | 010/2007 | IPCA | RMEL | REN 443/2011 | 12/20/2015 | 12/19/2045 | R$22,136.06 | 6/1/2025 | Ativa | Substituído TPC CCV525 com desgaste prematuro e risco de dano com vazamento de óleo pela coluna capacitiva. Posição Operacional: 85T1-B/ICA. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Nordeste | IBICOARA | MC 500 kV TR 500/230 kV IBICOARA TR1 BA | RB | FT TR 500/230 kV IBICOARA TR1 BA | 010/2007 | IPCA | RBNI | REA 5861/2016 | 5/25/2018 | 5/24/2046 | R$35,516.48 | 6/1/2025 | Ativa | Esquema para evitar sobrecarga no autotransformador 500/230 kV da SE Ibicoara - Brumado II * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Nordeste | IBICOARA | MC 230 kV TR 500/230 kV IBICOARA TR3 BA | RB | FT TR 500/230 kV IBICOARA TR3 BA | 010/2007 | IPCA | RBNI | REA 5211/2015 | 6/10/2019 | 6/9/2050 | R$ 1,417,183.59 | 6/1/2025 | Ativa | T2015-018 | Instalação, na Subestação Ibicoara, de um módulo de conexão, em 230 kV, para o segundo banco de autotransformadores 500/230 kV, de 3 x 100 MVA. *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | IBICOARA | MC 230 kV TR 500/230 kV IBICOARA TR1 BA | RB | FT TR 500/230 kV IBICOARA TR1 BA | 010/2007 | IPCA | RBL | CC 010/2007 | 6/11/2007 | 6/11/2037 | R$468,215.34 | 6/1/2025 | Ativa | T2000-115 | Contrato de Concessão nº 010/2007 *(Considera adicional de RGR relativo à prorrogação do encargo. Receita revisada em 19/06/2012 no reajuste para o Ciclo 2012-2013. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IBICOARA | MC 230 kV TR 230/138 kV IBICOARA TR3 BA | RBF | FT TR 230/138 kV IBICOARA TR3 BA | 010/2007 | IPCA | RBNIA | DSP 3602/2024 | R$ 1,249,470.25 | 6/1/2025 | Prevista | T2024-230 | Instalar, na SE IBICOARA, um módulo de conexão, em 230 kV, para o transformador trifásico TR3 230/138 kV - 100 MVA, arranjo Barra Dupla a Quatro Chaves. | ||||
| AXIA Energia Nordeste | IBICOARA | MC 230 kV TR 230/138 kV IBICOARA TR2 BA | RBF | FT TR 230/138 kV IBICOARA TR2 BA | 010/2007 | IPCA | RBL | CC 010/2007 | 6/11/2007 | 6/11/2037 | R$468,215.34 | 6/1/2025 | Ativa | T2000-115 | Contrato de Concessão nº 010/2007 *(Considera adicional de RGR relativo à prorrogação do encargo. Receita revisada em 19/06/2012 no reajuste para o Ciclo 2012-2013. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IBICOARA | MC 230 kV TR 230/138 kV IBICOARA TR1 BA | RBF | FT TR 230/138 kV IBICOARA TR1 BA | 010/2007 | IPCA | RBL | CC 010/2007 | 6/11/2007 | 6/11/2037 | R$468,215.34 | 6/1/2025 | Ativa | T2000-115 | Contrato de Concessão nº 010/2007 *(Considera adicional de RGR relativo à prorrogação do encargo. Receita revisada em 19/06/2012 no reajuste para o Ciclo 2012-2013. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IBICOARA | MC 138 kV TR 230/138 kV IBICOARA TR3 BA | RBF | FT TR 230/138 kV IBICOARA TR3 BA | 010/2007 | IPCA | RBNIA | DSP 3602/2024 | R$907,182.48 | 6/1/2025 | Prevista | T2024-230 | Instalar, na SE IBICOARA, um módulo de conexão, em 138 kV, para o transformador trifásico TR3 230/138 kV - 100 MVA, arranjo Barra Principal e Transferência. | ||||
| AXIA Energia Nordeste | IBICOARA | MC 138 kV TR 230/138 kV IBICOARA TR2 BA | RBF | FT TR 230/138 kV IBICOARA TR2 BA | 010/2007 | IPCA | RBL | CC 010/2007 | 6/11/2007 | 6/11/2037 | R$229,349.64 | 6/1/2025 | Ativa | T2000-115 | Contrato de Concessão nº 010/2007 *(Considera adicional de RGR relativo à prorrogação do encargo. Receita revisada em 19/06/2012 no reajuste para o Ciclo 2012-2013. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IBICOARA | MC 138 kV TR 230/138 kV IBICOARA TR1 BA | RBF | FT TR 230/138 kV IBICOARA TR1 BA | 010/2007 | IPCA | RBL | CC 010/2007 | 6/11/2007 | 6/11/2037 | R$229,349.64 | 6/1/2025 | Ativa | T2000-115 | Contrato de Concessão nº 010/2007 *(Considera adicional de RGR relativo à prorrogação do encargo. Receita revisada em 19/06/2012 no reajuste para o Ciclo 2012-2013. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IBICOARA | IB 500 kV MG 500 kV IBICOARA MG2 BA IB3 | RB | FT MG 500 kV IBICOARA MG2 BA | 010/2007 | IPCA | RBL | CC 010/2007 | 6/11/2007 | 6/11/2037 | R$440,454.83 | 6/1/2025 | Ativa | T2000-115 | Contrato de Concessão nº 010/2007 *(Considera adicional de RGR relativo à prorrogação do encargo. Receita revisada em 19/06/2012 no reajuste para o Ciclo 2012-2013. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IBICOARA | IB 230 kV MG 500 kV IBICOARA MG2 BA IB1 | RB | FT MG 500 kV IBICOARA MG2 BA | 010/2007 | IPCA | RBL | CC 010/2007 | 6/11/2007 | 6/11/2037 | R$267,974.44 | 6/1/2025 | Ativa | T2000-115 | Contrato de Concessão nº 010/2007 *(Considera adicional de RGR relativo à prorrogação do encargo. Receita revisada em 19/06/2012 no reajuste para o Ciclo 2012-2013. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IBICOARA | IB 138 kV MG 500 kV IBICOARA MG2 BA IB1 | DIT | 010/2007 | IPCA | RPEC | CC 010/2007 | 6/11/2007 | 6/11/2037 | R$123,764.51 | 6/1/2025 | Ativa | T2000-115 | Contrato de Concessão nº 010/2007 *(Considera adicional de RGR relativo à prorrogação do encargo. Receita revisada em 19/06/2012 no reajuste para o Ciclo 2012-2013. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | IBICOARA | EL 230 kV IBICOARA LT 230 kV BRUMADO II /IBICOARA C-1 BA | RB | FT LT 230 kV BRUMADO II /IBICOARA C-1 BA | 010/2007 | IPCA | RBL | CC 010/2007 | 6/11/2007 | 6/11/2037 | R$539,647.45 | 6/1/2025 | Ativa | T2000-115 | Contrato de Concessão nº 010/2007 *(Considera adicional de RGR relativo à prorrogação do encargo. Receita revisada em 19/06/2012 no reajuste para o Ciclo 2012-2013. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IBICOARA | EL 138 kV IBICOARA DIST2 | DIT | 010/2007 | IPCA | RCDM | REA 1523/2008 | 2/24/2011 | 2/23/2033 | R$788,033.68 | 6/1/2025 | Ativa | Instalação de uma entrada de linha 138 kV para Itaguarana.*Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | ||||
| AXIA Energia Nordeste | IBICOARA | EL 138 kV IBICOARA DIST1 | DIT | 010/2007 | IPCA | RCDM | REA 1523/2008 | 2/24/2011 | 2/23/2033 | R$788,033.68 | 6/1/2025 | Ativa | Instalação de uma entrada de linha 138 kV para Mucugê.*Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | ||||
| AXIA Energia Nordeste | IBICOARA | EL 138 kV IBICOARA DIST1 | DIT | 010/2007 | IPCA | RMEL | REN 643/2014 | 9/27/2014 | 9/26/2044 | R$2,071.86 | 6/1/2025 | Ativa | Revitalização Necessária: SUBSTITUIÇÃO DO TPI ARTECHE 83C1 FASE A. INCLUÍDO NO RECURSO CONTRA A REH 2.098/2016.*Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | ||||
| AXIA Energia | IBIUNA | TR 500/345 kV IBIUNA ATR3 SP | RB | FT TR 500/345 kV IBIUNA ATR3 SP | 034/2001 | IGPM | RBNI | REA 3744/2012 | 12/9/2015 | 8/12/2050 | R$ 7,365,520.74 | 6/1/2025 | Ativa | T2012-087 | I – instalação do 3º banco de autotransformadores monofásicos 500/345-13,8 kV, 3 x 250 MVA; *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | ||
| AXIA Energia | IBIUNA | TR 500/345 kV IBIUNA ATR2 SP | RB | FT TR 500/345 kV IBIUNA ATR2 SP | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 6,871,349.92 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | IBIUNA | TR 500/345 kV IBIUNA ATR1 SP | RB | FT TR 500/345 kV IBIUNA ATR1 SP | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 6,871,349.92 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | IBIUNA | TR 345/20 kV IBIUNA TRW2 SP | RB | FT CS 330/-220 MVAr IBIUNA CS4 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$607,572.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | TR 345/20 kV IBIUNA TRW2 SP | RB | FT CS 330/-220 MVAr IBIUNA CS4 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,331,485.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | TR 345/20 kV IBIUNA TRV2 SP | RB | FT CS 330/-220 MVAr IBIUNA CS3 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$607,572.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | TR 345/20 kV IBIUNA TRV2 SP | RB | FT CS 330/-220 MVAr IBIUNA CS3 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,331,485.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | TR 345/20 kV IBIUNA TRV2 SP | RB | FT CS 330/-220 MVAr IBIUNA CS3 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/30/2020 | 11/8/2055 | R$49,786.46 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IBIUNA | TR 345/20 kV IBIUNA TRU2 SP | RB | FT CS 330/-220 MVAr IBIUNA CS2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$607,572.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | TR 345/20 kV IBIUNA TRU2 SP | RB | FT CS 330/-220 MVAr IBIUNA CS2 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,331,485.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | TR 345/20 kV IBIUNA TRT2 SP | RB | FT CS 330/-220 MVAr IBIUNA CS1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$607,572.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | TR 345/20 kV IBIUNA TRT2 SP | RB | FT CS 330/-220 MVAr IBIUNA CS1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,331,485.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | TR 345/20 kV IBIUNA TR2RES SP | RB | FT TR 345/20 kV IBIUNA TR2RES SP | 062/2001 | IPCA | RBNI | REA 7831/2019 | 8/20/2021 | 5/5/2056 | R$ 4,334,272.62 | 6/1/2025 | Ativa | T2018-110 | Instalação do Módulo de Equipamento - Transformador Trifásico 345/20 kV – 350 MVA, reserva, na SE Ibiúna. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | IBIUNA | TR 345/122 kV IBIUNA TRZQ1 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$607,572.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | TR 345/122 kV IBIUNA TRZP1 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$607,572.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | TR 345/122 kV IBIUNA TRZM1 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$607,572.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | TR 345/122 kV IBIUNA TRZL1 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$607,572.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | TR 345/122 kV IBIUNA TRZH1 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$607,572.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | TR 345/122 kV IBIUNA TRZG1 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$607,572.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | TR 345/122 kV IBIUNA TRZE1 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$607,572.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | TR 345/122 kV IBIUNA TRZD1 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$607,572.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | RTL 500 kV 35 Mvar IBIUNA RTR2 SP | RB | FT RTL 500 kV 35 Mvar IBIUNA RTR2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$214,459.55 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | RTL 500 kV 105 Mvar IBIUNA RTINBC2 SP | RB | FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 2,773,569.65 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | IBIUNA | RTL 500 kV 105 Mvar IBIUNA RTINBC1 SP | RB | FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 2,773,569.65 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | IBIUNA | RTB 500 kV 60 Mvar IBIUNA RTR1 SP | RB | FT RTB 500 kV 60 Mvar IBIUNA RTR1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$260,455.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | RTB 500 kV 44 Mvar IBIUNA RTR3 SP | RB | FT RTB 500 kV 44 Mvar IBIUNA RTR3 SP | 062/2001 | IPCA | RBNIA | REA 15073/2024 | R$595,535.37 | 6/1/2025 | Prevista | T2023-171-A | Instalação de uma fase reserva para o 2º banco de reatores de barra 345 kV - 44 Mvar, na SE Ibiúna. | ||||
| AXIA Energia | IBIUNA | RTB 500 kV 180 Mvar IBIUNA RT3 SP | RB | FT RTB 500 kV 180 Mvar IBIUNA RT3 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$781,365.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | RTB 345 kV 44 Mvar IBIUNA RTR2 SP | RB | FT RTB 345 kV 44 Mvar IBIUNA RTR2 SP | 062/2001 | IPCA | RBNIA | REA 15073/2024 | R$595,535.37 | 6/1/2025 | Prevista | T2023-169-A | Instalação de uma fase reserva para o 1º banco de reatores de barra 345 kV - 44 Mvar, na SE Ibiúna. | ||||
| AXIA Energia | IBIUNA | RTB 345 kV 132 Mvar IBIUNA RT5 SP | RB | FT RTB 345 kV 132 Mvar IBIUNA RT5 SP | 062/2001 | IPCA | RBNIA | REA 15073/2024 | R$ 1,786,606.09 | 6/1/2025 | Prevista | T2023-171 | Instalação do 2º banco de reatores de barra 345 kV - 3x44 Mvar, na SE Ibiúna. | ||||
| AXIA Energia | IBIUNA | RTB 345 kV 132 Mvar IBIUNA RT4 SP | RB | FT RTB 345 kV 132 Mvar IBIUNA RT4 SP | 062/2001 | IPCA | RBNIA | REA 15073/2024 | R$ 1,786,606.09 | 6/1/2025 | Prevista | T2023-169 | Instalação do 1º banco de reatores de barra 345 kV - 3x44 Mvar, na SE Ibiúna. | ||||
| AXIA Energia | IBIUNA | MG 500 kV IBIUNA MG2 SP | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,535,530.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | MG 500 kV IBIUNA MG2 SP | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 6/20/2016 | 2/14/2030 | R$9,109.64 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (004276/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IBIUNA | MG 500 kV IBIUNA MG2 SP | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBNI | REA 7831/2019 | 8/13/2021 | 1/21/2051 | R$480,509.02 | 6/1/2025 | Ativa | T2018-110 | Adequação do Módulo de Infraestrutura de Manobra 345 kV – Complementação do Módulo Geral referente a instalação do Transformador Trifásico reserva SE Ibiúna *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | IBIUNA | MG 500 kV IBIUNA MG2 SP | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBNI | REA 8314/2019 | 2/11/2021 | 2/10/2036 | R$20,461.29 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000369/2014. (FT: LT 500 kV IBIUNA / ITATIBA C 1 SP) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IBIUNA | MG 500 kV IBIUNA MG2 SP | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBNIA | REA 15073/2024 | R$515,680.56 | 6/1/2025 | Prevista | T2023-169 | Módulo de infraestrutura associado à instalação do 1º banco de reatores de barra 345 kV - 3x44 Mvar, em 345 kV e arranjo DJM, na SE Ibiúna. | ||||
| AXIA Energia | IBIUNA | MG 500 kV IBIUNA MG2 SP | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/3/2017 | 6/5/2041 | R$788,887.51 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IBIUNA | MG 500 kV IBIUNA MG1 SP | RB | FT MG 500 kV IBIUNA MG1 SP | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 12,619,317.38 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | IBIUNA | MG 500 kV IBIUNA MG1 SP | RB | FT MG 500 kV IBIUNA MG1 SP | 034/2001 | IGPM | RMEL | REN 443/2011 | 6/20/2016 | 6/22/2046 | R$7,287.13 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (002384/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | |||
| AXIA Energia | IBIUNA | MG 500 kV IBIUNA MG1 SP | RB | FT MG 500 kV IBIUNA MG1 SP | 034/2001 | IGPM | RMEL | REN 443/2011 | 6/20/2016 | 6/22/2046 | R$7,287.13 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (002911/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | |||
| AXIA Energia | IBIUNA | MG 500 kV IBIUNA MG1 SP | RB | FT MG 500 kV IBIUNA MG1 SP | 034/2001 | IGPM | RMEL | REN 443/2011 | 6/20/2016 | 6/22/2046 | R$7,287.13 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (010122/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | |||
| AXIA Energia | IBIUNA | MG 500 kV IBIUNA MG1 SP | RB | FT MG 500 kV IBIUNA MG1 SP | 034/2001 | IGPM | RBNI | REA 8314/2019 | 2/11/2021 | 2/4/2036 | R$11,499.30 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000418/2014. (FT: LT 500 kV IBIUNA / BATEIAS C 1 SP/PR)* Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 27/06/2024) | |||
| AXIA Energia | IBIUNA | MG 500 kV IBIUNA MG1 SP | RB | FT MG 500 kV IBIUNA MG1 SP | 034/2001 | IGPM | RBNI | REA 8314/2019 | 2/11/2021 | 2/4/2036 | R$11,499.30 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000396/2014. (FT: LT 500 kV IBIUNA / BATEIAS C 2 SP/PR)* Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 27/06/2024) | |||
| AXIA Energia | IBIUNA | MG 500 kV IBIUNA MG1 SP | RB | FT MG 500 kV IBIUNA MG1 SP | 034/2001 | IGPM | RBNI | REA 8314/2019 | 2/10/2021 | 2/3/2036 | R$19,842.38 | 6/1/2025 | Ativa | Implantação de Unidade de Medição Fasorial – PMU e sistema de comunicação associado adicional para transmissão das medidas para o ONS, na barra da subestação.* Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 27/06/2024) | |||
| AXIA Energia | IBIUNA | MC 500 kV TR 500/345 kV IBIUNA ATR3 SP | RB | FT TR 500/345 kV IBIUNA ATR3 SP | 034/2001 | IGPM | RBNI | REA 3744/2012 | 12/9/2015 | 12/6/2047 | R$ 2,514,632.15 | 6/1/2025 | Ativa | T2012-087 | II – instalação do módulo de conexão 500 kV, arranjo disjuntor e meio, referente ao 3º banco de autotransformadores; *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | ||
| AXIA Energia | IBIUNA | MC 500 kV TR 500/345 kV IBIUNA ATR2 SP | RB | FT TR 500/345 kV IBIUNA ATR2 SP | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 2,508,875.19 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | IBIUNA | MC 500 kV TR 500/345 kV IBIUNA ATR1 SP | RB | FT TR 500/345 kV IBIUNA ATR1 SP | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 2,508,875.19 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | IBIUNA | MC 500 kV RTL 500 kV 105 Mvar IBIUNA RTINBC2 SP | RB | FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 1,254,437.60 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | IBIUNA | MC 500 kV RTL 500 kV 105 Mvar IBIUNA RTINBC1 SP | RB | FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 1,254,437.60 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | IBIUNA | MC 500 kV RTB 500 kV 180 Mvar IBIUNA RT3 SP | RB | FT RTB 500 kV 180 Mvar IBIUNA RT3 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,400.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | MC 500 kV CR 500 kV 382 Mvar IBIUNA BC2A SP | RB | FT CR 500 kV 382 MVAr IBIUNA BC2A SP | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 2,508,875.19 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | IBIUNA | MC 500 kV CR 500 kV 382 Mvar IBIUNA BC1A SP | RB | FT CR 500 kV 382 MVAr IBIUNA BC1A SP | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 2,508,875.19 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | IBIUNA | MC 345 kV TR 500/345 kV IBIUNA ATR3 SP | RB | FT TR 500/345 kV IBIUNA ATR3 SP | 034/2001 | IGPM | RBNI | REA 3744/2012 | 12/9/2015 | 1/22/2048 | R$ 1,724,818.25 | 6/1/2025 | Ativa | T2012-087 | III – instalação do módulo de conexão 345 kV, arranjo disjuntor e meio, referente ao 3º banco de autotransformadores; *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | ||
| AXIA Energia | IBIUNA | MC 345 kV TR 500/345 kV IBIUNA ATR2 SP | RB | FT TR 500/345 kV IBIUNA ATR2 SP | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 1,367,034.26 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | IBIUNA | MC 345 kV TR 500/345 kV IBIUNA ATR1 SP | RB | FT TR 500/345 kV IBIUNA ATR1 SP | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 1,367,034.26 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | IBIUNA | MC 345 kV TR 345/20 kV IBIUNA TRW2 SP | RB | FT CS 330/-220 MVAr IBIUNA CS4 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$249,483.20 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | MC 345 kV TR 345/20 kV IBIUNA TRV2 SP | RB | FT CS 330/-220 MVAr IBIUNA CS3 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$249,483.20 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | MC 345 kV TR 345/20 kV IBIUNA TRU2 SP | RB | FT CS 330/-220 MVAr IBIUNA CS2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$249,483.20 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | MC 345 kV TR 345/20 kV IBIUNA TRT2 SP | RB | FT CS 330/-220 MVAr IBIUNA CS1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$249,483.20 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | MC 345 kV TR 345/122 kV IBIUNA TRZQ1 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$249,483.20 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | MC 345 kV TR 345/122 kV IBIUNA TRZQ1 SP | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$957,361.15 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | MC 345 kV TR 345/122 kV IBIUNA TRZP1 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$249,483.20 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | MC 345 kV TR 345/122 kV IBIUNA TRZM1 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$249,483.20 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | MC 345 kV TR 345/122 kV IBIUNA TRZL1 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$249,483.20 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | MC 345 kV TR 345/122 kV IBIUNA TRZH1 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$249,483.20 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | MC 345 kV TR 345/122 kV IBIUNA TRZG1 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$249,483.20 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | MC 345 kV TR 345/122 kV IBIUNA TRZE1 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$249,483.20 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | MC 345 kV TR 345/122 kV IBIUNA TRZD1 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$249,483.20 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | MC 345 kV RTB 345 kV 132 Mvar IBIUNA RT5 SP | RB | FT RTB 345 kV 132 Mvar IBIUNA RT5 SP | 062/2001 | IPCA | RBNIA | REA 15073/2024 | R$ 1,771,435.95 | 6/1/2025 | Prevista | T2023-171 | Instalação da conexão para o 2º banco de reatores de barra 345 kV - 3x44 Mvar, em 345 kV e arranjo DJM, na SE Ibiúna. | ||||
| AXIA Energia | IBIUNA | MC 345 kV RTB 345 kV 132 Mvar IBIUNA RT4 SP | RB | FT RTB 345 kV 132 Mvar IBIUNA RT4 SP | 062/2001 | IPCA | RBNIA | REA 15073/2024 | R$ 1,771,435.95 | 6/1/2025 | Prevista | T2023-169 | Instalação da conexão para o 1º banco de reatores de barra 345 kV - 3x44 Mvar, em 345 kV e arranjo DJM, na SE Ibiúna. | ||||
| AXIA Energia | IBIUNA | MC 345 kV BF 345 kV 59 Mvar IBIUNA ZRJ SP | RB | FT BF 345 kV 59 Mvar IBIUNA ZRJ SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$257,964.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | MC 345 kV BF 345 kV 59 Mvar IBIUNA ZRI SP | RB | FT BF 345 kV 59 Mvar IBIUNA ZRI SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$257,964.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | MC 345 kV BF 345 kV 296,3 Mvar IBIUNA ZRL SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$257,964.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | MC 345 kV BF 345 kV 296,3 Mvar IBIUNA ZRL SP | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 4/17/2019 | 12/24/2051 | R$311,084.90 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | IBIUNA | MC 345 kV BF 345 kV 296 Mvar IBIUNA ZRN SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$257,964.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | MC 345 kV BF 345 kV 294 Mvar IBIUNA ZRG SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$257,964.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | MC 345 kV BF 345 kV 294 Mvar IBIUNA ZRG SP | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 4/17/2019 | 12/24/2051 | R$311,004.53 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | IBIUNA | MC 345 kV BF 345 kV 294 Mvar IBIUNA ZRD SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$257,964.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | MC 345 kV BF 345 kV 294 Mvar IBIUNA ZRD SP | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 2/5/2016 | 4/24/2047 | R$212,106.05 | 6/1/2025 | Ativa | Substituição de 1 disjuntor (1AF3 - vão filtro BCZRD) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | IBIUNA | MC 345 kV BF 345 kV 279,8 Mvar IBIUNA ZRC SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$257,964.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | MC 345 kV BF 345 kV 237 Mvar IBIUNA ZRH SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$257,964.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | MC 345 kV BF 345 kV 237 Mvar IBIUNA ZRF SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$257,964.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | MC 345 kV BF 345 kV 237 Mvar IBIUNA ZRB SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$257,964.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | MC 345 kV BF 345 kV 237 Mvar IBIUNA ZRA SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$257,964.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | MC 345 kV BF 345 kV 237 Mvar IBIUNA ZRA SP | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$989,907.86 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | MC 345 kV BF 345 kV 220,8 Mvar IBIUNA ZRM SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$257,964.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | MC 345 kV BF 345 kV 220,8 Mvar IBIUNA ZRK SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$257,964.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | MC 345 kV BF 345 kV 220,8 Mvar IBIUNA ZRE SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$257,964.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | MC 20 kV CS 330/-220 Mvar IBIUNA CS4 SP | RB | FT CS 330/-220 MVAr IBIUNA CS4 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$57,640.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | MC 20 kV CS 330/-220 Mvar IBIUNA CS3 SP | RB | FT CS 330/-220 MVAr IBIUNA CS3 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$57,640.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | MC 20 kV CS 330/-220 Mvar IBIUNA CS2 SP | RB | FT CS 330/-220 MVAr IBIUNA CS2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$57,640.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | MC 20 kV CS 330/-220 Mvar IBIUNA CS1 SP | RB | FT CS 330/-220 MVAr IBIUNA CS1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$57,640.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | MC 13,8 kV TR 500/345 kV IBIUNA ATR3 SP | RB | FT TR 500/345 kV IBIUNA ATR3 SP | 034/2001 | IGPM | RBNI | REA 3744/2012 | 12/9/2015 | 2/3/2046 | R$138,965.26 | 6/1/2025 | Ativa | T2012-087 | IV – instalação do módulo de conexão 13,8 kV, referente ao 3º banco de autotransformadores. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | ||
| AXIA Energia | IBIUNA | IB 500 kV MG 500 kV IBIUNA MG2 SP IB4 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | IB 500 kV MG 500 kV IBIUNA MG2 SP IB3 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | IB 500 kV MG 500 kV IBIUNA MG2 SP IB3 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2018 | 1/4/2048 | R$38,707.44 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IBIUNA | IB 500 kV MG 500 kV IBIUNA MG2 SP IB2 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | IB 500 kV MG 500 kV IBIUNA MG2 SP IB1 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | IB 345 kV MG 500 kV IBIUNA MG2 SP IB9 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | IB 345 kV MG 500 kV IBIUNA MG2 SP IB8 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | IB 345 kV MG 500 kV IBIUNA MG2 SP IB8 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 4/17/2019 | 12/24/2051 | R$311,004.53 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IBIUNA | IB 345 kV MG 500 kV IBIUNA MG2 SP IB7 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | IB 345 kV MG 500 kV IBIUNA MG2 SP IB6 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | IB 345 kV MG 500 kV IBIUNA MG2 SP IB5 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | IB 345 kV MG 500 kV IBIUNA MG2 SP IB4 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | IB 345 kV MG 500 kV IBIUNA MG2 SP IB3 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | IB 345 kV MG 500 kV IBIUNA MG2 SP IB3 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$928,957.53 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | IB 345 kV MG 500 kV IBIUNA MG2 SP IB20 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | IB 345 kV MG 500 kV IBIUNA MG2 SP IB2 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | IB 345 kV MG 500 kV IBIUNA MG2 SP IB2 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$928,957.53 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | IB 345 kV MG 500 kV IBIUNA MG2 SP IB19 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | IB 345 kV MG 500 kV IBIUNA MG2 SP IB18 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | IB 345 kV MG 500 kV IBIUNA MG2 SP IB17 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | IB 345 kV MG 500 kV IBIUNA MG2 SP IB16 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | IB 345 kV MG 500 kV IBIUNA MG2 SP IB15 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | IB 345 kV MG 500 kV IBIUNA MG2 SP IB14 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | IB 345 kV MG 500 kV IBIUNA MG2 SP IB13 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | IB 345 kV MG 500 kV IBIUNA MG2 SP IB12 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | IB 345 kV MG 500 kV IBIUNA MG2 SP IB11 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | IB 345 kV MG 500 kV IBIUNA MG2 SP IB10 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | IB 345 kV MG 500 kV IBIUNA MG2 SP IB1 | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | IB 345 kV MG 500 kV IBIUNA MG2 SP | RB | FT MG 500 kV IBIUNA MG2 SP | 062/2001 | IPCA | RBNIA | REA 15073/2024 | R$ 1,940,008.72 | 6/1/2025 | Prevista | T2023-169 | Instalação da interligação de barras para o 1º banco de reatores de barra 345 kV - 3x44 Mvar, na SE Ibiúna. | ||||
| AXIA Energia | IBIUNA | EL 600 kV IBIUNA LT 600 kV F.IGUACU 50HZ /IBIUNA C-4 PR/SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$707,119.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | EL 600 kV IBIUNA LT 600 kV F.IGUACU 50HZ /IBIUNA C-4 PR/SP | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/31/2023 | 2/2/2053 | R$111,841.55 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | IBIUNA | EL 600 kV IBIUNA LT 600 kV F.IGUACU 50HZ /IBIUNA C-3 PR/SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$707,119.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | EL 600 kV IBIUNA LT 600 kV F.IGUACU 50HZ /IBIUNA C-3 PR/SP | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/31/2023 | 2/2/2053 | R$111,841.55 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | IBIUNA | EL 600 kV IBIUNA LT 600 kV F.IGUACU 50HZ /IBIUNA C-2 PR/SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$707,119.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | EL 600 kV IBIUNA LT 600 kV F.IGUACU 50HZ /IBIUNA C-1 PR/SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$707,119.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | EL 500 kV IBIUNA LT 500 kV IBIUNA /ITATIBA C-1 SP | RB | FT LT 500 kV IBIUNA /ITATIBA C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | EL 500 kV IBIUNA LT 500 kV IBIUNA /BATEIAS C-2 SP/PR | RB | FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 2,781,322.20 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | IBIUNA | EL 500 kV IBIUNA LT 500 kV IBIUNA /BATEIAS C-2 SP/PR | RB | FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR | 034/2001 | IGPM | RBNI | REA 5484/2015 | 3/9/2018 | 3/2/2042 | R$117,934.40 | 6/1/2025 | Ativa | Substituição de para-raios no terminal da SE Ibiúna da LT Ibiúna – Bateias 500 kV circ.1 e 2 (e banco de reatores LT - observação acrescentada em resposta ao Ofício 345/2015) - TOTAL 20 PARA-RAIOS -( 2 POR FASE EM CADA circuito, 3 por reator com1 reator reserva) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | |||
| AXIA Energia | IBIUNA | EL 500 kV IBIUNA LT 500 kV IBIUNA /BATEIAS C-2 SP/PR | RB | FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR | 034/2001 | IGPM | RBNI | REA 5861/2016 | 2/10/2021 | 2/3/2036 | R$7,795.22 | 6/1/2025 | Ativa | LT 500kV Ibiúna - Bateias C2 -Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 27/06/2024) | |||
| AXIA Energia | IBIUNA | EL 500 kV IBIUNA LT 500 kV IBIUNA /BATEIAS C-1 SP/PR | RB | FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 2,781,322.20 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | IBIUNA | EL 500 kV IBIUNA LT 500 kV IBIUNA /BATEIAS C-1 SP/PR | RB | FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR | 034/2001 | IGPM | RBNI | REA 5484/2015 | 3/9/2018 | 3/2/2042 | R$138,073.94 | 6/1/2025 | Ativa | Substituição de para-raios no terminal da SE Ibiúna da LT Ibiúna – Bateias 500 kV circ.1 e 2 (e banco de reatores LT - observação acrescentada em resposta ao Ofício 345/2015) - TOTAL 20 PARA-RAIOS -( 2 POR FASE EM CADA circuito, 3 por reator com1 reator reserva) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | |||
| AXIA Energia | IBIUNA | EL 500 kV IBIUNA LT 500 kV IBIUNA /BATEIAS C-1 SP/PR | RB | FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR | 034/2001 | IGPM | RBNI | REA 5861/2016 | 2/10/2021 | 2/3/2036 | R$7,795.22 | 6/1/2025 | Ativa | LT 500kV Ibiúna - Bateias C1 -Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 27/06/2024) | |||
| AXIA Energia | IBIUNA | EL 345 kV IBIUNA LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP | RB | FT LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,201.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | EL 345 kV IBIUNA LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP | RB | FT LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/23/2015 | 1/9/2034 | R$110,588.06 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IBIUNA | EL 345 kV IBIUNA LT 345 kV IBIUNA /SUL C-1 SP | RB | FT LT 345 kV IBIUNA /SUL C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,201.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | EL 345 kV IBIUNA LT 345 kV IBIUNA /SUL C-1 SP | RB | FT LT 345 kV IBIUNA /SUL C-1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/23/2015 | 1/9/2034 | R$110,588.06 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IBIUNA | EL 345 kV IBIUNA LT 345 kV IBIUNA /INTERLAGOS C-2 SP | RB | FT LT 345 kV IBIUNA /INTERLAGOS C-2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,201.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | EL 345 kV IBIUNA LT 345 kV IBIUNA /INTERLAGOS C-2 SP | RB | FT LT 345 kV IBIUNA /INTERLAGOS C-2 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/27/2022 | 3/26/2037 | R$270,672.38 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IBIUNA | EL 345 kV IBIUNA LT 345 kV IBIUNA /INTERLAGOS C-1 SP | RB | FT LT 345 kV IBIUNA /INTERLAGOS C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,201.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | EL 345 kV IBIUNA LT 345 kV IBIUNA /INTERLAGOS C-1 SP | RB | FT LT 345 kV IBIUNA /INTERLAGOS C-1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/10/2022 | 3/9/2037 | R$369,802.18 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IBIUNA | EL 345 kV IBIUNA LT 345 kV GUARULHOS /IBIUNA C-2 SP | RB | FT LT 345 kV GUARULHOS /IBIUNA C-2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,201.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | EL 345 kV IBIUNA LT 345 kV GUARULHOS /IBIUNA C-2 SP | RB | FT LT 345 kV GUARULHOS /IBIUNA C-2 SP | 062/2001 | IPCA | RMEL | REN 643/2014 | 3/6/2016 | 7/30/2038 | R$28,450.30 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IBIUNA | EL 345 kV IBIUNA LT 345 kV GUARULHOS /IBIUNA C-2 SP | RB | FT LT 345 kV GUARULHOS /IBIUNA C-2 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/3/2015 | 12/10/2031 | R$199,953.46 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IBIUNA | EL 345 kV IBIUNA LT 345 kV GUARULHOS /IBIUNA C-1 SP | RB | FT LT 345 kV GUARULHOS /IBIUNA C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,201.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | EL 345 kV IBIUNA LT 345 kV GUARULHOS /IBIUNA C-1 SP | RB | FT LT 345 kV GUARULHOS /IBIUNA C-1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/18/2015 | 12/11/2032 | R$130,759.35 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CVR4 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 4,130,000.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CVR3 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 4,130,000.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CVR2 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 4,130,000.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CVR1 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 4,130,000.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CV8 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 12,390,002.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CV7 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 12,390,002.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CV6 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 12,390,002.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CV6 SP | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/31/2019 | 11/2/2049 | R$153,119.81 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CV5 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 12,390,002.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CV5 SP | DIT | 062/2001 | IPCA | RMEL | REA 11324/2022 | 4/14/2022 | 3/22/2057 | R$ 2,058,367.53 | 6/1/2025 | Ativa | T2022-033 | Parcela de RAP referente à revitalização completa de um transformador de potência reserva de 345 kV. Não excluir a receita de O&M associada a PRT 579/2012 até a substituição do módulo completo da conversora. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CV5 SP | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/15/2019 | 11/17/2049 | R$102,203.13 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CV4 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 12,390,002.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CV4 SP | DIT | 062/2001 | IPCA | RMELP | REA 16051/2025 | R$ 6,059,092.86 | 6/1/2025 | Prevista | T2025-022 | Revitalização do transformador conversor 7476860 para aumento de vida útil e atendimento à modernização do elo de corrente contínua de Furnas - DIT Itaipú. Equipamento atualmente na posição CV 600/600 kV IBIUNA CV3 SP - TRZE1-A. Após a revitalização será movimentado para o bipolo 1, com previsão de instalação na posição CV 600/600 kV IBIUNA CV4 SP - TRZH1-B. | |||||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CV4 SP | DIT | 062/2001 | IPCA | RMELP | REA 16051/2025 | R$ 6,073,901.47 | 6/1/2025 | Prevista | T2025-023 | Revitalização do transformador conversor 7197223 para aumento de vida útil e atendimento à modernização do elo de corrente contínua de Furnas - DIT Itaipú. Equipamento atualmente na posição CV 600/600 kV IBIUNA CV3 SP - TRZE1-B. Após a revitalizaão será movimentado para o bipolo 1, com previsão de instalação na posição CV 600/600 kV IBIUNA CV4 SP - TRZH1-A. | |||||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CV4 SP | DIT | 062/2001 | IPCA | RMELP | REA 16051/2025 | R$ 5,870,759.34 | 6/1/2025 | Prevista | T2025-025 | Revitalização do transformador conversor 58778 para aumento de vida útil e atendimento à modernização do elo de corrente contínua de Furnas - DIT Itaipú. Equipamento atualmente na posição CV 600/600 kV IBIUNA CV4 SP - TRZH1-A. Após a revitalizaão será movimentado para o bipolo 1, com previsão de instalação na posição CV 600/600 kV IBIUNA CV4 SP - TRZH1-C. | |||||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CV3 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 12,390,002.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CV3 SP | DIT | 062/2001 | IPCA | RMELP | REA 16051/2025 | R$ 6,059,092.86 | 6/1/2025 | Prevista | T2025-020 | Revitalização do transformador conversor 57855 para aumento de vida útil e atendimento à modernização do elo de corrente contínua de Furnas - DIT Itaipú. Equipamento atualmente na posição CV 600/600 kV IBIUNA CV3 SP - TRZE1-C. Após a revitalização será movimentado para o bipolo 1, com previsão de instalação na posição CV 600/600 kV IBIUNA CV3 SP - TRZE1-A. | |||||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CV3 SP | DIT | 062/2001 | IPCA | RMELP | REA 16051/2025 | R$ 6,059,092.86 | 6/1/2025 | Prevista | T2025-021 | Revitalização do transformador conversor 7197222 para aumento de vida útil e atendimento à modrnização do elo de corrente contínua de Furnas - DIT Itaipú. Equipamento atualmente na posição CV 600/600 kV IBIUNA CVR4 SP. Após a revitalização será movimentado para o bipolo 1, com previsão de instalação na posição CV 600/600 kV IBIUNA CV3 SP - TRZE1-B. | |||||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CV3 SP | DIT | 062/2001 | IPCA | RMELP | REA 16051/2025 | R$ 5,870,759.34 | 6/1/2025 | Prevista | T2025-024 | Revitalização do transformador conversor 7197226 para aumento de vida útil e atendimento à modernização do elo de corrente contínua de Furnas - DIT Itaipú. Equipamento atualmente na posição CV 600/600 kV IBIUNA CV4 SP - TRZH1-B. Após a revitalização será movimentado para o bipolo 1, com previsão de instalação na posição CV 600/600 kV IBIUNA CV3 SP - TRZE1-C. | |||||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CV2 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 12,390,002.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CV2 SP | DIT | 062/2001 | IPCA | RMEL | REA 11324/2022 | 4/14/2022 | 3/22/2057 | R$ 1,198,114.44 | 6/1/2025 | Ativa | T2022-033 | Parcela de RAP referente à revitalização completa do banco de transformadores conversores 345 kV (TRZG1 A). Não excluir a receita de O&M associada a PRT 579/2012 até a substituição do módulo completo da conversora. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CV2 SP | DIT | 062/2001 | IPCA | RMEL | REA 11324/2022 | 4/14/2022 | 3/22/2057 | R$ 1,073,521.12 | 6/1/2025 | Ativa | T2022-033 | Parcela de RAP referente à revitalização completa de transformador conversor, trafo reserva. Não excluir a receita de O&M associada a PRT 579/2012 até a substituição do módulo completo da conversora. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CV2 SP | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/12/2019 | 11/14/2049 | R$255,446.20 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CV1 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 12,390,002.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CV1 SP | DIT | 062/2001 | IPCA | RMEL | REA 7831/2019 | 10/28/2021 | 10/5/2056 | R$ 3,451,035.95 | 6/1/2025 | Ativa | T2018-109 | Obra de Substituição Parcial - Substituição da Fase C do Módulo de Equipamento – Transformador Conversor ZD1 345/v3 /122/v3 / 122 kV - 300 MVA - 60 Hz - ±300 kV DC, SE Campos. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CV1 SP | DIT | 062/2001 | IPCA | RMEL | REA 11324/2022 | 4/14/2022 | 3/22/2057 | R$ 1,993,414.27 | 6/1/2025 | Ativa | T2022-033 | Parcela de RAP referente à revitalização completa de transformador conversor, CV01. Não excluir a receita de O&M associada a PRT 579/2012 até a substituição do módulo completo da conversora. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CV1 SP | DIT | 062/2001 | IPCA | RMEL | REA 11324/2022 | 11/22/2023 | 11/21/2058 | R$ 3,764,030.62 | 6/1/2025 | Ativa | T2022-053 | Obra de Substituição Parcial - Substituir na SE Ibiúna a fase C (7197231)- TR 345/122 kV IBIUNA TR2 SP. Parcela de RAP referente à troca da fase C (7197231). Não excluir a receita de O&M antiga até a troca de todos os equipamentos do módulo. | |||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CV1 SP | DIT | 062/2001 | IPCA | RMEL | REA 11324/2022 | 9/13/2023 | 9/12/2058 | R$ 3,764,030.62 | 6/1/2025 | Ativa | T2022-054 | Revitalização da Unidade atualmente na Reserva. Atende a 12 unidades em operação. (7197232) - TR 345/122 kV IBIUNA TR2 SP. Não excluir a receita de O&M antiga até a troca de todos os equipamentos do módulo. | |||
| AXIA Energia | IBIUNA | CV 600/600 kV IBIUNA CV1 SP | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/23/2019 | 11/25/2049 | R$204,529.52 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | IBIUNA | CS 330/-220 Mvar IBIUNA CS4 SP | RB | FT CS 330/-220 MVAr IBIUNA CS4 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,583,325.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | CS 330/-220 Mvar IBIUNA CS4 SP | RB | FT CS 330/-220 MVAr IBIUNA CS4 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 9,913,192.69 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | CS 330/-220 Mvar IBIUNA CS4 SP | RB | FT CS 330/-220 MVAr IBIUNA CS4 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 4/24/2020 | 4/23/2045 | R$ 153.59 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IBIUNA | CS 330/-220 Mvar IBIUNA CS3 SP | RB | FT CS 330/-220 MVAr IBIUNA CS3 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,583,325.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | CS 330/-220 Mvar IBIUNA CS3 SP | RB | FT CS 330/-220 MVAr IBIUNA CS3 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 9,913,192.69 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | CS 330/-220 Mvar IBIUNA CS3 SP | RB | FT CS 330/-220 MVAr IBIUNA CS3 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 9/30/2020 | 9/29/2045 | R$ 644.52 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IBIUNA | CS 330/-220 Mvar IBIUNA CS2 SP | RB | FT CS 330/-220 MVAr IBIUNA CS2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,583,325.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | CS 330/-220 Mvar IBIUNA CS2 SP | RB | FT CS 330/-220 MVAr IBIUNA CS2 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 9,913,192.69 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | CS 330/-220 Mvar IBIUNA CS2 SP | RB | FT CS 330/-220 MVAr IBIUNA CS2 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 9/30/2020 | 9/29/2045 | R$ 140.33 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IBIUNA | CS 330/-220 Mvar IBIUNA CS1 SP | RB | FT CS 330/-220 MVAr IBIUNA CS1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,583,325.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | CS 330/-220 Mvar IBIUNA CS1 SP | RB | FT CS 330/-220 MVAr IBIUNA CS1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 9,913,192.69 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | CS 330/-220 Mvar IBIUNA CS1 SP | RB | FT CS 330/-220 MVAr IBIUNA CS1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/30/2019 | 11/29/2044 | R$ 78.98 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IBIUNA | CR 500 kV 382 Mvar IBIUNA BC2B SP | RB | FT CR 500 kV 382 MVAr IBIUNA BC2A SP | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 12,023,662.56 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | IBIUNA | CR 500 kV 382 Mvar IBIUNA BC2A SP | RB | FT CR 500 kV 382 MVAr IBIUNA BC2A SP | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 12,023,662.56 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | IBIUNA | CR 500 kV 382 Mvar IBIUNA BC1B SP | RB | FT CR 500 kV 382 MVAr IBIUNA BC1A SP | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 12,023,662.56 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | IBIUNA | CR 500 kV 382 Mvar IBIUNA BC1A SP | RB | FT CR 500 kV 382 MVAr IBIUNA BC1A SP | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 12,023,662.56 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | IBIUNA | BF 600 kV 1575 Mvar IBIUNA PO04 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,474,658.09 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | BF 600 kV 1575 Mvar IBIUNA PO03 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,474,658.09 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | BF 600 kV 1575 Mvar IBIUNA PO02 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,474,658.09 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | BF 600 kV 1575 Mvar IBIUNA PO01 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,474,658.09 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | BF 345 kV 59 Mvar IBIUNA ZRJ SP | RB | FT BF 345 kV 59 Mvar IBIUNA ZRJ SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$204,761.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | BF 345 kV 59 Mvar IBIUNA ZRI SP | RB | FT BF 345 kV 59 Mvar IBIUNA ZRI SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$204,761.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | BF 345 kV 296,3 Mvar IBIUNA ZRL SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$337,065.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | BF 345 kV 296 Mvar IBIUNA ZRN SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$337,065.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | BF 345 kV 294 Mvar IBIUNA ZRG SP | RB | FT BF 345 kV 294 Mvar IBIUNA ZRG SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$336,426.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | BF 345 kV 294 Mvar IBIUNA ZRD SP | RB | FT BF 345 kV 294 Mvar IBIUNA ZRD SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$336,426.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IBIUNA | BF 345 kV 279,8 Mvar IBIUNA ZRC SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$332,367.92 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | BF 345 kV 237 Mvar IBIUNA ZRH SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$318,757.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | BF 345 kV 237 Mvar IBIUNA ZRF SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$318,757.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | BF 345 kV 237 Mvar IBIUNA ZRB SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$318,757.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | BF 345 kV 237 Mvar IBIUNA ZRA SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$318,757.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | BF 345 kV 220,8 Mvar IBIUNA ZRM SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$312,953.39 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | BF 345 kV 220,8 Mvar IBIUNA ZRK SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$312,953.39 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IBIUNA | BF 345 kV 220,8 Mvar IBIUNA ZRE SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$312,953.39 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ICO | TT 69/13,8 kV ICO TA1 CE | DIT | 061/2001 | IPCA | RCDM | REA 3578/2012 | 2/18/2017 | 10/17/2047 | R$188,072.80 | 6/1/2025 | Ativa | Obra de Substituição Completa - Substituição de 1 transformador de aterramento: 02A1. (Potência: 7,5 MVA) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ICO | TT 69/13,8 kV ICO TA1 CE | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/12/2021 | 12/15/2051 | R$ 559.92 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | ICO | TR 230/69 kV ICO TR3 CE | RBF | FT TR 230/69 kV ICO TR3 CE | 061/2001 | IPCA | RBNI | REA 7977/2019 | 3/28/2024 | 3/27/2058 | R$ 1,489,966.02 | 6/1/2025 | Ativa | T2019-031 | Instalação do terceiro transformador trifásico 230/69 kV, 100 MVA. | ||
| AXIA Energia Nordeste | ICO | TR 230/69 kV ICO TR2 CE | RBF | FT TR 230/69 kV ICO TR2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ICO | TR 230/69 kV ICO TR1 CE | RBF | FT TR 230/69 kV ICO TR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ICO | TR 230/69 kV ICO TR1 CE | RBF | FT TR 230/69 kV ICO TR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ICO | TR 230/69 kV ICO TR1 CE | RBF | FT TR 230/69 kV ICO TR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$913,997.96 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ICO | MG 230 kV ICO MG1 CE | RB | FT MG 230 kV ICO MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$464,605.52 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ICO | MG 230 kV ICO MG1 CE | RB | FT MG 230 kV ICO MG1 CE | 061/2001 | IPCA | RBNI | REA 1814/2009 | 1/20/2013 | 1/19/2043 | R$50,610.91 | 6/1/2025 | Ativa | Complementação do módulo geral com um módulo de infraestrutura de manobra associado a entrada de linha em 69 kV para SE Icó II. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ICO | MG 230 kV ICO MG1 CE | RB | FT MG 230 kV ICO MG1 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 6/21/2013 | 6/20/2030 | R$14,341.09 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCOS DE BATERIAS 800A1 E 800A2 DE 125 Vcc.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ICO | MG 230 kV ICO MG1 CE | RB | FT MG 230 kV ICO MG1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,303,761.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ICO | MG 230 kV ICO MG1 CE | RB | FT MG 230 kV ICO MG1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,201,908.89 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ICO | MG 230 kV ICO MG1 CE | RB | FT MG 230 kV ICO MG1 CE | 061/2001 | IPCA | RMEL | REN 443/2011 | 9/29/2016 | 9/28/2033 | R$8,122.37 | 6/1/2025 | Ativa | Implantação de Banco de Baterias * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ICO | MG 230 kV ICO MG1 CE | RB | FT MG 230 kV ICO MG1 CE | 061/2001 | IPCA | RBNI | REA 7977/2019 | 4/18/2024 | 4/17/2053 | R$110,870.21 | 6/1/2025 | Ativa | T2019-031 | Instalação de módulo de infraestrutura MIM em 230 kV, associado à instalação do terceiro transformador trifásico 230/69 kV, 100 MVA. | ||
| AXIA Energia Nordeste | ICO | MG 230 kV ICO MG1 CE | RB | FT MG 230 kV ICO MG1 CE | 061/2001 | IPCA | RBNI | REA 7977/2019 | 4/18/2024 | 4/17/2054 | R$37,866.61 | 6/1/2025 | Ativa | T2019-031 | Instalação de módulo de infraestrutura MIM em 69 kV, associado à instalação do terceiro transformador trifásico 230/69 kV, 100 MVA. | ||
| AXIA Energia Nordeste | ICO | MG 230 kV ICO MG1 CE | RB | FT MG 230 kV ICO MG1 CE | 061/2001 | IPCA | RBNI | REA 7977/2019 | 4/18/2024 | 4/17/2064 | R$9,401.15 | 6/1/2025 | Ativa | T2019-031 | Recapacitação do barramento de 69 kV da Subestação Icó | ||
| AXIA Energia Nordeste | ICO | MG 230 kV ICO MG1 CE | RB | FT MG 230 kV ICO MG1 CE | 061/2001 | IPCA | RBNI | REA 8314/2019 | 6/8/2018 | 6/7/2033 | R$2,083.49 | 6/1/2025 | Ativa | Substituição do Concentrador de Dados (Sistema SCADA) para atendimento ao aumento da observabilidade associada ao Procedimento de Rede 2.7. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ICO | MG 230 kV ICO MG1 CE | RB | FT MG 230 kV ICO MG1 CE | 061/2001 | IPCA | RBNI | REA 7761/2019 | 8/31/2015 | 8/30/2043 | R$38,847.04 | 6/1/2025 | Ativa | Implantação de Sistema para acesso remoto a dispositivos de Proteção, Controle e Automação. Sistema composto de Painel com PCs Industriais (1 Concentrador, 1 Firewall, 1 Receptor GPS, 1 Switch Gerenciável) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ICO | MG 230 kV ICO MG1 CE | RB | FT MG 230 kV ICO MG1 CE | 061/2001 | IPCA | RBNIA | DSP 2563/2023 | R$180,601.26 | 6/1/2025 | Prevista | T2023-128 | Instalação de 1 Módulo de Infraestrutura de Manobra 230 kV na SE Icó, associado a Entrada de Linha 230 kV para a SE Banabuiú C2, em função do seccionamento da LT 230 kV Banabuiú - Milagres C2. | ||||
| AXIA Energia Nordeste | ICO | MG 230 kV ICO MG1 CE | RB | FT MG 230 kV ICO MG1 CE | 061/2001 | IPCA | RBNIA | DSP 2563/2023 | R$180,601.26 | 6/1/2025 | Prevista | T2023-128 | Instalação de 1 Módulo de Infraestrutura de Manobra 230 kV na SE Icó, associado a Entrada de Linha 230 kV para a SE Milagres C2, em função do seccionamento da LT 230 kV Banabuiú - Milagres C2. | ||||
| AXIA Energia Nordeste | ICO | MG 230 kV ICO MG1 CE | RB | FT MG 230 kV ICO MG1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/15/2021 | 8/11/2037 | R$320,341.64 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ICO | MC 69 kV TT 69/13,8 kV ICO TA1 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ICO | MC 69 kV TR 230/69 kV ICO TR3 CE | RBF | FT TR 230/69 kV ICO TR3 CE | 061/2001 | IPCA | RBNI | REA 7977/2019 | 3/28/2024 | 3/27/2052 | R$399,365.22 | 6/1/2025 | Ativa | T2019-031 | Instalação, na SE ICO, de um módulo de conexão, em 69 kV, para o autotransformador TR 230/69 kV ICO TR3 CE | ||
| AXIA Energia Nordeste | ICO | MC 69 kV TR 230/69 kV ICO TR2 CE | RBF | FT TR 230/69 kV ICO TR2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ICO | MC 69 kV TR 230/69 kV ICO TR1 CE | RBF | FT TR 230/69 kV ICO TR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ICO | MC 69 kV TR 230/69 kV ICO TR1 CE | RBF | FT TR 230/69 kV ICO TR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ICO | MC 230 kV TR 230/69 kV ICO TR3 CE | RBF | FT TR 230/69 kV ICO TR3 CE | 061/2001 | IPCA | RBNI | REA 7977/2019 | 3/28/2024 | 3/27/2052 | R$ 1,042,371.17 | 6/1/2025 | Ativa | T2019-031 | Instalação, na SE ICO, de um módulo de conexão, em 230 kV, para o autotransformador TR 230/69 kV ICO TR3 CE | ||
| AXIA Energia Nordeste | ICO | MC 230 kV TR 230/69 kV ICO TR2 CE | RBF | FT TR 230/69 kV ICO TR2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ICO | MC 230 kV TR 230/69 kV ICO TR2 CE | RBF | FT TR 230/69 kV ICO TR2 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2021 | 12/31/2035 | R$11,857.58 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ICO | MC 230 kV TR 230/69 kV ICO TR1 CE | RBF | FT TR 230/69 kV ICO TR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ICO | MC 230 kV TR 230/69 kV ICO TR1 CE | RBF | FT TR 230/69 kV ICO TR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$410,719.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ICO | MC 230 kV TR 230/69 kV ICO TR1 CE | RBF | FT TR 230/69 kV ICO TR1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/21/2021 | 11/20/2049 | R$14,475.98 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ICO | IB 69 kV MG 230 kV ICO MG1 CE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ICO | IB 69 kV MG 230 kV ICO MG1 CE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$118,244.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ICO | IB 69 kV MG 230 kV ICO MG1 CE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$109,007.13 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ICO | IB 69 kV MG 230 kV ICO MG1 CE IB1 | DIT | 061/2001 | IPCA | RCDM | REA 7977/2019 | 3/28/2024 | 3/27/2064 | R$6,941.16 | 6/1/2025 | Ativa | T2019-031 | Adequações no IB de 69 kV da Subestação Icó | |||
| AXIA Energia Nordeste | ICO | IB 230 kV MG 230 kV ICO MG1 CE IB1 | RB | FT MG 230 kV ICO MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,837.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ICO | IB 230 kV MG 230 kV ICO MG1 CE IB1 | RB | FT MG 230 kV ICO MG1 CE | 061/2001 | IPCA | RBNI | REA 7977/2019 | 4/18/2024 | 4/17/2039 | R$17,579.67 | 6/1/2025 | Ativa | T2019-031 | Adequação no módulo de interligação IB em 230 kV, associado à instalação do terceiro transformador trifásico 230/69 kV, 100 MVA. | ||
| AXIA Energia Nordeste | ICO | EL 69 kV ICO S.M.DO OES.02J8 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ICO | EL 69 kV ICO S.M.DO OES.02J8 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ICO | EL 69 kV ICO S.M.DO OES.02J8 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ICO | EL 69 kV ICO S.M.DO OES.02J7 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ICO | EL 69 kV ICO OROS 02J4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ICO | EL 69 kV ICO OROS 02J4 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ICO | EL 69 kV ICO OROS 02J4 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/1/2022 | 10/3/2052 | R$34,884.86 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | ICO | EL 69 kV ICO IGUATU 02J6 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ICO | EL 69 kV ICO IGUATU 02J6 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ICO | EL 69 kV ICO IGUATU 02J6 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ICO | EL 69 kV ICO ICO II 02J5 | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 1/29/2013 | 5/15/2045 | R$365,831.94 | 6/1/2025 | Ativa | Receita referente a uma EL 69 kV para SE Tejipió. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ICO | EL 69 kV ICO CEDRO 02J9 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ICO | EL 69 kV ICO CEDRO 02J9 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ICO | EL 230 kV ICO LT 230 kV ICO /MILAGRES C-2 CE | RB | FT LT 230 kV ICO /MILAGRES C-2 CE | 061/2001 | IPCA | RBNIA | DSP 2563/2023 | R$ 1,678,538.90 | 6/1/2025 | Prevista | T2023-128 | Instalar, na SE ICO, um módulo de entrada de linha para o circuito LT 230 kV ICO /MILAGRES C-2 CE originado do seccionamento do circuito LT 230 kV MILAGRES /BANABUIU C-2 CE na SE ICO. | ||||
| AXIA Energia Nordeste | ICO | EL 230 kV ICO LT 230 kV ICO /MILAGRES C-1 CE | RB | FT LT 230 kV ICO /MILAGRES C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ICO | EL 230 kV ICO LT 230 kV ICO /MILAGRES C-1 CE | RB | FT LT 230 kV ICO /MILAGRES C-1 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/20/2014 | 7/28/2045 | R$17,541.62 | 6/1/2025 | Ativa | Revitalização Necessária: SUBSTITUIÇÃO DO TC TRENCH 84M2 FASE B.INCLUÍDO NO RECURSO CONTRA A REH 2.098/2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ICO | EL 230 kV ICO LT 230 kV ICO /MILAGRES C-1 CE | RB | FT LT 230 kV ICO /MILAGRES C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$596,907.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ICO | EL 230 kV ICO LT 230 kV ICO /MILAGRES C-1 CE | RB | FT LT 230 kV ICO /MILAGRES C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2021 | 11/6/2042 | R$10,924.03 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ICO | EL 230 kV ICO LT 230 kV BANABUIU /ICO C-2 CE | RB | FT LT 230 kV BANABUIU /ICO C-2 CE | 061/2001 | IPCA | RBNIA | DSP 2563/2023 | R$ 1,678,538.90 | 6/1/2025 | Prevista | T2023-128 | Instalar, na SE ICO, um módulo de entrada de linha para o circuito LT 230 kV BANABUIU /ICO C-2 CE originado do seccionamento do circuito LT 230 kV MILAGRES /BANABUIU C-2 CE na SE ICO. | ||||
| AXIA Energia Nordeste | ICO | EL 230 kV ICO LT 230 kV BANABUIU /ICO C-1 CE | RB | FT LT 230 kV BANABUIU /ICO C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ICO | EL 230 kV ICO LT 230 kV BANABUIU /ICO C-1 CE | RB | FT LT 230 kV BANABUIU /ICO C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/3/2019 | 5/8/2049 | R$8,429.79 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | IGAPORA II | TT 69/0 kV IGAPORA II TT1 BA | ICG | 020/2010 | IPCA | RICG | CC 020/2010 | 6/2/2014 | 6/30/2032 | R$63,024.38 | 6/1/2025 | Ativa | T2010-091 | Contrato de Concessão nº 020/2010RPEC - ICG *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017.*Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | IGAPORA II | TR 230/69 kV IGAPORA II TR3 BA | ICG | 020/2010 | IPCA | RICGNI | REA 4316/2013 | 7/4/2016 | 6/30/2032 | R$ 1,842,941.96 | 6/1/2025 | Ativa | T2013-046 | Instalação, na subestação Igaporã II, de transformador trifásico 230/69 kV, de 150 MVA. *(Receita revisada em 21/06/2021) | |||
| AXIA Energia Nordeste | IGAPORA II | TR 230/69 kV IGAPORA II TR2 BA | ICG | 020/2010 | IPCA | RICG | CC 020/2010 | 6/2/2014 | 6/30/2032 | R$885,953.08 | 6/1/2025 | Ativa | T2010-091 | Contrato de Concessão nº 020/2010RPEC - ICG *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017.*Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | IGAPORA II | TR 230/69 kV IGAPORA II TR1 BA | ICG | 020/2010 | IPCA | RICG | CC 020/2010 | 6/2/2014 | 6/30/2032 | R$885,953.08 | 6/1/2025 | Ativa | T2010-091 | Contrato de Concessão nº 020/2010RPEC - ICG *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017.*Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | IGAPORA II | MG 230 kV IGAPORA II MG1 BA | RB | FT MG 230 kV IGAPORA II MG1 BA | 020/2010 | IPCA | RBL | CC 020/2010 | 6/2/2014 | 11/23/2040 | R$499,920.49 | 6/1/2025 | Ativa | T2010-091 | Contrato de Concessão nº 020/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | IGAPORA II | MG 230 kV IGAPORA II MG1 BA | RB | FT MG 230 kV IGAPORA II MG1 BA | 020/2010 | IPCA | RBNI | REA 4316/2013 | 7/4/2016 | 6/30/2032 | R$178,601.26 | 6/1/2025 | Ativa | T2013-046 | Complementação do módulo geral da subestação Igaporã II com um módulo de infraestrutura de manobra em 230 kV e um módulo de infraestrutura de manobra em 69 Kv. *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Nordeste | IGAPORA II | MG 230 kV IGAPORA II MG1 BA | RB | FT MG 230 kV IGAPORA II MG1 BA | 020/2010 | IPCA | RBNI | REN 643/2014 | 7/8/2016 | 7/7/2049 | R$79,895.28 | 6/1/2025 | Ativa | Instalar módulo de infraestrutura de manobra referente aos dois módulos de entrada de linha 69 kV para Caetité e Guanambi. Receita incluída após recurso da REH 2.258/2017. Reajuste 2017-2018. *(Receita revisada em 21/06/2021) | |||
| AXIA Energia Nordeste | IGAPORA II | MG 230 kV IGAPORA II MG1 BA | RB | FT MG 230 kV IGAPORA II MG1 BA | 020/2010 | IPCA | RBNI | REA 7761/2019 | 10/31/2015 | 10/30/2030 | R$32,987.45 | 6/1/2025 | Ativa | Implantação de Sistema para acesso remoto a dispositivos de Proteção, Controle e Automação. Sistema composto de Painel com PCs Industriais (1 Concentrador, 1 Firewall, 1 Receptor GPS, 1 Switch Gerenciável) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 | |||
| AXIA Energia Nordeste | IGAPORA II | MC 69 kV TT 69/0 kV IGAPORA II TT1 BA | ICG | 020/2010 | IPCA | RICG | CC 020/2010 | 6/2/2014 | 6/30/2032 | R$48,745.82 | 6/1/2025 | Ativa | T2010-091 | Contrato de Concessão nº 020/2010RPEC - ICG *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017.*Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | IGAPORA II | MC 69 kV TR 230/69 kV IGAPORA II TR3 BA | ICG | 020/2010 | IPCA | RICGNI | REA 4316/2013 | 7/4/2016 | 6/30/2032 | R$435,184.17 | 6/1/2025 | Ativa | T2013-046 | Instalação, na subestação Igaporã II, de um módulo de conexão de transformador em 69 kV, arranjo barra principal e transferência. *(Receita revisada em 21/06/2021) | |||
| AXIA Energia Nordeste | IGAPORA II | MC 69 kV TR 230/69 kV IGAPORA II TR2 BA | ICG | 020/2010 | IPCA | RICG | CC 020/2010 | 6/2/2014 | 6/30/2032 | R$114,290.78 | 6/1/2025 | Ativa | T2010-091 | Contrato de Concessão nº 020/2010RPEC - ICG *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017.*Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | IGAPORA II | MC 69 kV TR 230/69 kV IGAPORA II TR1 BA | ICG | 020/2010 | IPCA | RICG | CC 020/2010 | 6/2/2014 | 6/30/2032 | R$114,290.78 | 6/1/2025 | Ativa | T2010-091 | Contrato de Concessão nº 020/2010RPEC - ICG *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017.*Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | IGAPORA II | MC 69 kV BC 69 kV 21,3 Mvar IGAPORA II BC2 BA | ICG | 020/2010 | IPCA | RICG | CC 020/2010 | 6/2/2014 | 6/30/2032 | R$138,784.69 | 6/1/2025 | Ativa | T2010-091 | Contrato de Concessão nº 020/2010RPEC - ICG *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017.*Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | IGAPORA II | MC 69 kV BC 69 kV 21,3 Mvar IGAPORA II BC1 BA | ICG | 020/2010 | IPCA | RICG | CC 020/2010 | 6/2/2014 | 6/30/2032 | R$138,784.69 | 6/1/2025 | Ativa | T2010-091 | Contrato de Concessão nº 020/2010RPEC - ICG *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017.*Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | IGAPORA II | MC 230 kV TR 230/69 kV IGAPORA II TR3 BA | ICG | 020/2010 | IPCA | RICGNI | REA 4316/2013 | 7/4/2016 | 6/30/2032 | R$ 1,179,172.92 | 6/1/2025 | Ativa | T2013-046 | Instalação, na subestação Igaporã II, de um módulo de conexão de transformador em 230 kV, arranjo barra dupla a quatro chaves. *(Receita revisada em 21/06/2021) | |||
| AXIA Energia Nordeste | IGAPORA II | MC 230 kV TR 230/69 kV IGAPORA II TR2 BA | ICG | 020/2010 | IPCA | RICG | CC 020/2010 | 6/2/2014 | 6/30/2032 | R$280,906.57 | 6/1/2025 | Ativa | T2010-091 | Contrato de Concessão nº 020/2010RPEC - ICG *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017.*Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | IGAPORA II | MC 230 kV TR 230/69 kV IGAPORA II TR1 BA | ICG | 020/2010 | IPCA | RICG | CC 020/2010 | 6/2/2014 | 6/30/2032 | R$280,906.57 | 6/1/2025 | Ativa | T2010-091 | Contrato de Concessão nº 020/2010RPEC - ICG *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017.*Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | IGAPORA II | MC 230 kV BC 230 kV 50 Mvar IGAPORA II BC1 BA | RB | FT BC 230 kV 50 Mvar IGAPORA II BC1 BA | 020/2010 | IPCA | RBL | CC 020/2010 | 6/2/2014 | 11/23/2040 | R$265,781.72 | 6/1/2025 | Ativa | T2010-091 | Contrato de Concessão nº 020/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | IGAPORA II | IB 69 kV MG 230 kV IGAPORA II MG1 BA IB1 | ICG | 020/2010 | IPCA | RICG | CC 020/2010 | 6/2/2014 | 6/30/2032 | R$77,932.74 | 6/1/2025 | Ativa | T2010-091 | Contrato de Concessão nº 020/2010RPEC - ICG *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017.*Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | IGAPORA II | IB 230 kV MG 230 kV IGAPORA II MG1 BA IB1 | RB | FT MG 230 kV IGAPORA II MG1 BA | 020/2010 | IPCA | RBL | CC 020/2010 | 6/2/2014 | 11/23/2040 | R$176,981.37 | 6/1/2025 | Ativa | T2010-091 | Contrato de Concessão nº 020/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | IGAPORA II | EL 69 kV IGAPORA II GUANAMBI | DIT | 020/2010 | IPCA | RCDM | REN 443/2011 | 7/8/2016 | 7/7/2039 | R$467,227.42 | 6/1/2025 | Ativa | Instalação de novo módulo de entrada de linha para Guanambi. Receita incluída após recurso da REH 2.258/2017. Reajuste 2017-2018. *(Receita revisada em 21/06/2021) | ||||
| AXIA Energia Nordeste | IGAPORA II | EL 69 kV IGAPORA II CAETITE | DIT | 020/2010 | IPCA | RCDM | REN 443/2011 | 7/8/2016 | 7/7/2039 | R$467,227.42 | 6/1/2025 | Ativa | Instalação de novo módulo de entrada de linha para Caetité. Receita incluída após recurso da REH 2.258/2017. Reajuste 2017-2018. *(Receita revisada em 21/06/2021) | ||||
| AXIA Energia Nordeste | IGAPORA II | EL 230 kV IGAPORA II LT 230 kV IGAPORA II /IGAPORA III C-2 BA | RB | FT LT 230 kV IGAPORA II /IGAPORA III C-2 BA | 019/2012 | IPCA | RBL | CC 019/2012 | 11/16/2015 | 6/1/2042 | R$648,156.67 | 6/1/2025 | Ativa | T2012-078 | T2012-078 - SE 500/230 kV Igaporã III; SE 230/69 kV Pindaí II (ICG) e LTs 230 kV - Rede Básica *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IGAPORA II | EL 230 kV IGAPORA II LT 230 kV IGAPORA II /IGAPORA III C-1 BA | RB | FT LT 230 kV IGAPORA II /IGAPORA III C-1 BA | 019/2012 | IPCA | RBL | CC 019/2012 | 11/16/2015 | 6/1/2042 | R$648,156.67 | 6/1/2025 | Ativa | T2012-078 | T2012-078 - SE 500/230 kV Igaporã III; SE 230/69 kV Pindaí II (ICG) e LTs 230 kV - Rede Básica *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IGAPORA II | EL 230 kV IGAPORA II LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA | RB | FT LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA | 020/2010 | IPCA | RBL | CC 020/2010 | 6/2/2014 | 11/23/2040 | R$329,366.10 | 6/1/2025 | Ativa | T2010-091 | Contrato de Concessão nº 020/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | IGAPORA II | BC 69 kV 21,3 Mvar IGAPORA II BC2 BA | ICG | 020/2010 | IPCA | RICG | CC 020/2010 | 6/2/2014 | 6/30/2032 | R$197,032.57 | 6/1/2025 | Ativa | T2010-091 | Contrato de Concessão nº 020/2010RPEC - ICG *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017.*Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | IGAPORA II | BC 69 kV 21,3 Mvar IGAPORA II BC1 BA | ICG | 020/2010 | IPCA | RICG | CC 020/2010 | 6/2/2014 | 6/30/2032 | R$197,032.57 | 6/1/2025 | Ativa | T2010-091 | Contrato de Concessão nº 020/2010RPEC - ICG *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017.*Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | IGAPORA II | BC 230 kV 50 Mvar IGAPORA II BC1 BA | RB | FT BC 230 kV 50 Mvar IGAPORA II BC1 BA | 020/2010 | IPCA | RBL | CC 020/2010 | 6/2/2014 | 11/23/2040 | R$277,992.75 | 6/1/2025 | Ativa | T2010-091 | Contrato de Concessão nº 020/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | IGAPORA III | TR 500/230 kV IGAPORA III TRR1 BA | RB | FT TR 500/230 kV IGAPORA III TRR1 BA | 019/2012 | IPCA | RBL | CC 019/2012 | 11/16/2015 | 6/1/2042 | R$ 1,994,890.44 | 6/1/2025 | Ativa | T2012-078 | T2012-078 - SE 500/230 kV Igaporã III; SE 230/69 kV Pindaí II (ICG) e LTs 230 kV - Rede Básica *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IGAPORA III | TR 500/230 kV IGAPORA III TR4 BA | RB | FT TR 500/230 kV IGAPORA III TR4 BA | 019/2012 | IPCA | RBNI | REA 5211/2015 | 3/12/2019 | 3/11/2054 | R$ 6,490,545.73 | 6/1/2025 | Ativa | T2015-017 | Instalação, na Subestação Igaporã III, do quarto banco de autotransformadores 500/230, de 3 x 250 MVA. *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | IGAPORA III | TR 500/230 kV IGAPORA III TR3 BA | RB | FT TR 500/230 kV IGAPORA III TR3 BA | 019/2012 | IPCA | RBNI | REA 4493/2014 | 8/7/2018 | 8/6/2053 | R$ 6,490,545.73 | 6/1/2025 | Ativa | T2013-097 | Instalação, na SE Igaporã III, do 3º banco de autotransformadores 500/230 kV - 3x250 MVA. *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | IGAPORA III | TR 500/230 kV IGAPORA III TR2 BA | RB | FT TR 500/230 kV IGAPORA III TR2 BA | 019/2012 | IPCA | RBL | CC 019/2012 | 11/16/2015 | 6/1/2042 | R$ 5,984,669.12 | 6/1/2025 | Ativa | T2012-078 | T2012-078 - SE 500/230 kV Igaporã III; SE 230/69 kV Pindaí II (ICG) e LTs 230 kV - Rede Básica *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IGAPORA III | TR 500/230 kV IGAPORA III TR1 BA | RB | FT TR 500/230 kV IGAPORA III TR1 BA | 019/2012 | IPCA | RBL | CC 019/2012 | 11/16/2015 | 6/1/2042 | R$ 5,984,669.12 | 6/1/2025 | Ativa | T2012-078 | T2012-078 - SE 500/230 kV Igaporã III; SE 230/69 kV Pindaí II (ICG) e LTs 230 kV - Rede Básica *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IGAPORA III | RTB 500 kV 50 Mvar IGAPORA III RTBR1 BA | RB | FT RTB 500 kV 50 Mvar IGAPORA III RTBR1 BA | 019/2012 | IPCA | RBNI | REA 4493/2014 | 8/9/2018 | 8/8/2053 | R$737,773.56 | 6/1/2025 | Ativa | T2013-097 | Instalação, na SE Igaporã III, de um reator de barra em 500 kV, de 50 Mvar, reserva. *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | IGAPORA III | RTB 500 kV 150 Mvar IGAPORA III RTB1 BA | RB | FT RTB 500 kV 150 Mvar IGAPORA III RTB1 BA | 019/2012 | IPCA | RBNI | REA 4493/2014 | 8/9/2018 | 8/8/2053 | R$ 2,420,516.87 | 6/1/2025 | Ativa | T2013-097 | Instalação, na SE Igaporã III, de um banco de reatores de barra em 500 kV, de 3x50 Mvar. *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | IGAPORA III | MG 500 kV IGAPORA III MG1 BA | RB | FT MG 500 kV IGAPORA III MG1 BA | 019/2012 | IPCA | RBL | CC 019/2012 | 11/16/2015 | 6/1/2042 | R$ 3,094,913.81 | 6/1/2025 | Ativa | T2012-078 | T2012-078 - SE 500/230 kV Igaporã III; SE 230/69 kV Pindaí II (ICG) e LTs 230 kV - Rede Básica *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IGAPORA III | MG 500 kV IGAPORA III MG1 BA | RB | FT MG 500 kV IGAPORA III MG1 BA | 019/2012 | IPCA | RBNI | REA 4493/2014 | 9/3/2018 | 9/2/2047 | R$703,867.09 | 6/1/2025 | Ativa | T2013-097 | Complementação, na SE Igaporã III, do módulo de infraestrutura geral 500 kV com a instalação de um módulo de infraestrutura de manobra 500 kV, arranjo disjuntor e meio, e um módulo de infraestrutura de manobra 230 kV, arranjo barra dupla a 4 chaves. *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | IGAPORA III | MG 500 kV IGAPORA III MG1 BA | RB | FT MG 500 kV IGAPORA III MG1 BA | 019/2012 | IPCA | RBNI | REA 5211/2015 | 3/12/2019 | 3/11/2048 | R$148,860.33 | 6/1/2025 | Ativa | T2015-017 | Complementação do módulo geral da na Subestação Igaporã III com um módulo de infraestrutura de manobra em 230 kV. *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | IGAPORA III | MG 500 kV IGAPORA III MG1 BA | RB | FT MG 500 kV IGAPORA III MG1 BA | 019/2012 | IPCA | RBNI | REA 7761/2019 | 4/30/2019 | 4/29/2034 | R$24,395.32 | 6/1/2025 | Ativa | Sistema de Amplificadores Ópticos para atendimento a SE Igaporã III * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Nordeste | IGAPORA III | MG 500 kV IGAPORA III MG1 BA | RB | FT MG 500 kV IGAPORA III MG1 BA | 019/2012 | IPCA | RBNI | REA 7761/2019 | 7/28/2020 | 7/27/2035 | R$28,408.03 | 6/1/2025 | Ativa | Implantação de Sistema para acesso remoto a dispositivos de Proteção, Controle e Automação. Sistema composto de Painel com PCs Industriais (Concentrador e Firewall), Receptor GPS, Switch Gerenciável. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 | |||
| AXIA Energia Nordeste | IGAPORA III | MC 500 kV TR 500/230 kV IGAPORA III TR4 BA | RB | FT TR 500/230 kV IGAPORA III TR4 BA | 019/2012 | IPCA | RBNI | REA 5211/2015 | 3/12/2019 | 3/11/2051 | R$ 2,186,027.34 | 6/1/2025 | Ativa | T2015-017 | Instalação, na SE IGAPORA III, de um módulo de conexão, em 500 kV, para o autotransformador TR 500/230 kV IGAPORA III TR4 BA *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | IGAPORA III | MC 500 kV TR 500/230 kV IGAPORA III TR3 BA | RB | FT TR 500/230 kV IGAPORA III TR3 BA | 019/2012 | IPCA | RBNI | REA 4493/2014 | 8/7/2018 | 8/6/2050 | R$ 2,186,027.34 | 6/1/2025 | Ativa | T2013-097 | Instalação, na SE Igaporã III, de um módulo de conexão em 500 kV, arranjo disjuntor e meio, para o 3º banco de autotransformadores 500/230 kV - 3 x 250 MVA. *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | IGAPORA III | MC 500 kV TR 500/230 kV IGAPORA III TR2 BA | RB | FT TR 500/230 kV IGAPORA III TR2 BA | 019/2012 | IPCA | RBL | CC 019/2012 | 11/16/2015 | 6/1/2042 | R$ 1,252,398.72 | 6/1/2025 | Ativa | T2012-078 | T2012-078 - SE 500/230 kV Igaporã III; SE 230/69 kV Pindaí II (ICG) e LTs 230 kV - Rede Básica *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IGAPORA III | MC 500 kV TR 500/230 kV IGAPORA III TR1 BA | RB | FT TR 500/230 kV IGAPORA III TR1 BA | 019/2012 | IPCA | RBL | CC 019/2012 | 11/16/2015 | 6/1/2042 | R$ 1,252,398.72 | 6/1/2025 | Ativa | T2012-078 | T2012-078 - SE 500/230 kV Igaporã III; SE 230/69 kV Pindaí II (ICG) e LTs 230 kV - Rede Básica *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IGAPORA III | MC 500 kV RTB 500 kV 150 Mvar IGAPORA III RTB1 BA | RB | FT RTB 500 kV 150 Mvar IGAPORA III RTB1 BA | 019/2012 | IPCA | RBNI | REA 4493/2014 | 8/9/2018 | 8/8/2050 | R$ 1,712,329.10 | 6/1/2025 | Ativa | T2013-097 | Instalação, na SE Igaporã III, de um módulo de conexão de reator de barras em 500 kV, arranjo disjuntor e meio. *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | IGAPORA III | MC 230 kV TR 500/230 kV IGAPORA III TR4 BA | RB | FT TR 500/230 kV IGAPORA III TR4 BA | 019/2012 | IPCA | RBNI | REA 5211/2015 | 3/12/2019 | 3/11/2050 | R$ 1,379,701.10 | 6/1/2025 | Ativa | T2015-017 | Instalação, na Subestação Igaporã III, de um módulo de conexão, em 230 kV, para o quarto banco de autotransformadores 500/230 kV, de 3 x 250 MVA. *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | IGAPORA III | MC 230 kV TR 500/230 kV IGAPORA III TR3 BA | RB | FT TR 500/230 kV IGAPORA III TR3 BA | 019/2012 | IPCA | RBNI | REA 4493/2014 | 8/7/2018 | 8/6/2049 | R$ 1,378,532.12 | 6/1/2025 | Ativa | T2013-097 | Instalação, na SE Igaporã III, de um módulo de conexão em 230 kV, arranjo barra dupla a 4 chaves, para o 3º banco de autotransformadores 500/230 kV - 3x250 MVA. *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | IGAPORA III | MC 230 kV TR 500/230 kV IGAPORA III TR2 BA | RB | FT TR 500/230 kV IGAPORA III TR2 BA | 019/2012 | IPCA | RBL | CC 019/2012 | 11/16/2015 | 6/1/2042 | R$460,192.52 | 6/1/2025 | Ativa | T2012-078 | T2012-078 - SE 500/230 kV Igaporã III; SE 230/69 kV Pindaí II (ICG) e LTs 230 kV - Rede Básica *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IGAPORA III | MC 230 kV TR 500/230 kV IGAPORA III TR1 BA | RB | FT TR 500/230 kV IGAPORA III TR1 BA | 019/2012 | IPCA | RBL | CC 019/2012 | 11/16/2015 | 6/1/2042 | R$460,192.52 | 6/1/2025 | Ativa | T2012-078 | T2012-078 - SE 500/230 kV Igaporã III; SE 230/69 kV Pindaí II (ICG) e LTs 230 kV - Rede Básica *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IGAPORA III | IB 500 kV MG 500 kV IGAPORA III MG1 BA IB4 | RB | FT MG 500 kV IGAPORA III MG1 BA | 019/2012 | IPCA | RBNI | REA 4493/2014 | 9/3/2018 | 9/2/2050 | R$ 2,092,966.85 | 6/1/2025 | Ativa | T2013-097 | Instalação, na SE Igaporã III, de um módulo de interligação de barras 500 kV, arranjo disjuntor e meio. *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | IGAPORA III | IB 500 kV MG 500 kV IGAPORA III MG1 BA IB3 | RB | FT MG 500 kV IGAPORA III MG1 BA | 019/2012 | IPCA | RBL | CC 019/2012 | 11/16/2015 | 6/1/2042 | R$ 1,336,360.69 | 6/1/2025 | Ativa | T2012-078 | T2012-078 - SE 500/230 kV Igaporã III; SE 230/69 kV Pindaí II (ICG) e LTs 230 kV - Rede Básica *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IGAPORA III | IB 500 kV MG 500 kV IGAPORA III MG1 BA IB2 | RB | FT MG 500 kV IGAPORA III MG1 BA | 019/2012 | IPCA | RBL | CC 019/2012 | 11/16/2015 | 6/1/2042 | R$ 1,336,360.69 | 6/1/2025 | Ativa | T2012-078 | T2012-078 - SE 500/230 kV Igaporã III; SE 230/69 kV Pindaí II (ICG) e LTs 230 kV - Rede Básica *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IGAPORA III | IB 500 kV MG 500 kV IGAPORA III MG1 BA IB1 | RB | FT MG 500 kV IGAPORA III MG1 BA | 019/2012 | IPCA | RBL | CC 019/2012 | 11/16/2015 | 6/1/2042 | R$ 1,336,360.69 | 6/1/2025 | Ativa | T2012-078 | T2012-078 - SE 500/230 kV Igaporã III; SE 230/69 kV Pindaí II (ICG) e LTs 230 kV - Rede Básica *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IGAPORA III | IB 230 kV MG 500 kV IGAPORA III MG1 BA IB1 | RB | FT MG 500 kV IGAPORA III MG1 BA | 019/2012 | IPCA | RBL | CC 019/2012 | 11/16/2015 | 6/1/2042 | R$400,623.40 | 6/1/2025 | Ativa | T2012-078 | T2012-078 - SE 500/230 kV Igaporã III; SE 230/69 kV Pindaí II (ICG) e LTs 230 kV - Rede Básica *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IGAPORA III | EL 230 kV IGAPORA III LT 230 kV IGAPORA III /PINDAI II C-1 BA | RB | FT LT 230 kV IGAPORA III /PINDAI II C-1 BA | 019/2012 | IPCA | RBL | CC 019/2012 | 11/16/2015 | 6/1/2042 | R$648,156.67 | 6/1/2025 | Ativa | T2012-078 | T2012-078 - SE 500/230 kV Igaporã III; SE 230/69 kV Pindaí II (ICG) e LTs 230 kV - Rede Básica *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IGAPORA III | EL 230 kV IGAPORA III LT 230 kV IGAPORA II /IGAPORA III C-2 BA | RB | FT LT 230 kV IGAPORA II /IGAPORA III C-2 BA | 019/2012 | IPCA | RBL | CC 019/2012 | 11/16/2015 | 6/1/2042 | R$648,156.67 | 6/1/2025 | Ativa | T2012-078 | T2012-078 - SE 500/230 kV Igaporã III; SE 230/69 kV Pindaí II (ICG) e LTs 230 kV - Rede Básica *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IGAPORA III | EL 230 kV IGAPORA III LT 230 kV IGAPORA II /IGAPORA III C-1 BA | RB | FT LT 230 kV IGAPORA II /IGAPORA III C-1 BA | 019/2012 | IPCA | RBL | CC 019/2012 | 11/16/2015 | 6/1/2042 | R$648,156.67 | 6/1/2025 | Ativa | T2012-078 | T2012-078 - SE 500/230 kV Igaporã III; SE 230/69 kV Pindaí II (ICG) e LTs 230 kV - Rede Básica *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Sul | IJUI 2 | TR 230/69 kV IJUI 2 TR3 RS | RBF | FT TR 230/69 kV IJUI 2 TR3 RS | 011/2010 | IPCA | RBNI | REA 7152/2018 | 1/9/2021 | 1/9/2055 | R$ 1,457,740.51 | 6/1/2025 | Ativa | T2018-021 | Instalação, na Subestação Ijuí 2, do 3° transformador trifásico 230/69 kV - 83 MVA *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Sul | IJUI 2 | TR 230/69 kV IJUI 2 TR2 RS | RBF | FT TR 230/69 kV IJUI 2 TR2 RS | 011/2010 | IPCA | RBL | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$ 1,081,392.01 | 6/1/2025 | Ativa | T2010-078-B | Contrato de Concessão nº 011/2010SE Ijuí 2 230/69 kV - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Sul | IJUI 2 | TR 230/69 kV IJUI 2 TR1 RS | RBF | FT TR 230/69 kV IJUI 2 TR1 RS | 011/2010 | IPCA | RBL | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$ 1,081,392.01 | 6/1/2025 | Ativa | T2010-078-B | Contrato de Concessão nº 011/2010SE Ijuí 2 230/69 kV - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Sul | IJUI 2 | MG 230 kV IJUI 2 MG1 RS | RB | FT MG 230 kV IJUI 2 MG1 RS | 011/2010 | IPCA | RBL | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$ 1,346,714.97 | 6/1/2025 | Ativa | T2010-078-B | Contrato de Concessão nº 011/2010SE Ijuí 2 230/69 kV - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Sul | IJUI 2 | MG 230 kV IJUI 2 MG1 RS | RB | FT MG 230 kV IJUI 2 MG1 RS | 011/2010 | IPCA | RBNI | REA 7152/2018 | 1/9/2021 | 1/9/2052 | R$146,684.03 | 6/1/2025 | Ativa | T2018-021 | Complementação do Módulo Geral 500 kV da Subestação Ijuí 2 com um módulo de infraestrutura de manobra em 230 kV. *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Sul | IJUI 2 | MG 230 kV IJUI 2 MG1 RS | RB | FT MG 230 kV IJUI 2 MG1 RS | 011/2010 | IPCA | RBNI | REA 7152/2018 | 1/9/2021 | 1/9/2052 | R$41,251.32 | 6/1/2025 | Ativa | T2018-021 | Complementação do Módulo Geral da Subestação Ijuí 2 com um módulo de infraestrutura de manobra em 69 kV. *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Sul | IJUI 2 | MG 230 kV IJUI 2 MG1 RS | RB | FT MG 230 kV IJUI 2 MG1 RS | 011/2010 | IPCA | RBNI | REN 1020/2022 | 5/5/2021 | 5/4/2052 | R$42,108.75 | 6/1/2025 | Ativa | MIM ASSOCIADO: 01 Entrada de linha 69 kV, arranjo barra P e T, referente à LI 69 kV Ceriluz 3 - Ijuí 2 na SE Ijuí 2 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2023 - 2024 | |||
| AXIA Energia Sul | IJUI 2 | MC 69 kV TR 230/69 kV IJUI 2 TR3 RS | RBF | FT TR 230/69 kV IJUI 2 TR3 RS | 011/2010 | IPCA | RBNI | REA 7152/2018 | 1/9/2021 | 1/9/2044 | R$463,053.42 | 6/1/2025 | Ativa | T2018-021 | Instalação, na Subestação Ijuí 2, de uma conexão em 69 kV na configuração BPT para o 3° transformador trifásico 230/69 kV - 83 MVA *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Sul | IJUI 2 | MC 69 kV TR 230/69 kV IJUI 2 TR2 RS | RBF | FT TR 230/69 kV IJUI 2 TR2 RS | 011/2010 | IPCA | RBL | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$174,934.33 | 6/1/2025 | Ativa | T2010-078-B | Contrato de Concessão nº 011/2010SE Ijuí 2 230/69 kV - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Sul | IJUI 2 | MC 69 kV TR 230/69 kV IJUI 2 TR1 RS | RBF | FT TR 230/69 kV IJUI 2 TR1 RS | 011/2010 | IPCA | RBL | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$174,934.33 | 6/1/2025 | Ativa | T2010-078-B | Contrato de Concessão nº 011/2010SE Ijuí 2 230/69 kV - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Sul | IJUI 2 | MC 230 kV TR 230/69 kV IJUI 2 TR3 RS | RBF | FT TR 230/69 kV IJUI 2 TR3 RS | 011/2010 | IPCA | RBNI | REA 7152/2018 | 1/9/2021 | 1/9/2044 | R$ 1,298,563.09 | 6/1/2025 | Ativa | T2018-021 | Instalação, na Subestação Ijuí 2, de uma conexão em 230 kV na configuração BD4 para o 3° transformador trifásico 230/69 kV - 83 MVA *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Sul | IJUI 2 | MC 230 kV TR 230/69 kV IJUI 2 TR2 RS | RBF | FT TR 230/69 kV IJUI 2 TR2 RS | 011/2010 | IPCA | RBL | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$439,863.86 | 6/1/2025 | Ativa | T2010-078-B | Contrato de Concessão nº 011/2010SE Ijuí 2 230/69 kV - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Sul | IJUI 2 | MC 230 kV TR 230/69 kV IJUI 2 TR1 RS | RBF | FT TR 230/69 kV IJUI 2 TR1 RS | 011/2010 | IPCA | RBL | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$439,863.86 | 6/1/2025 | Ativa | T2010-078-B | Contrato de Concessão nº 011/2010SE Ijuí 2 230/69 kV - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Sul | IJUI 2 | IB 69 kV MG 230 kV IJUI 2 MG1 RS IB1 | DIT | 011/2010 | IPCA | RPEC | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$86,014.71 | 6/1/2025 | Ativa | T2010-078-B | Contrato de Concessão nº 011/2010SE Ijuí 2 230/69 kV - RPEC *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Sul | IJUI 2 | IB 230 kV MG 230 kV IJUI 2 MG1 RS IB1 | RB | FT MG 230 kV IJUI 2 MG1 RS | 011/2010 | IPCA | RBL | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$324,707.76 | 6/1/2025 | Ativa | T2010-078-B | Contrato de Concessão nº 011/2010SE Ijuí 2 230/69 kV - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Sul | IJUI 2 | EL 69 kV IJUI 2 PARA PANAMBI | DIT | 011/2010 | IPCA | RPEC | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$150,505.79 | 6/1/2025 | Ativa | T2010-078-B | Contrato de Concessão nº 011/2010SE Ijuí 2 230/69 kV - RPEC *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Sul | IJUI 2 | EL 69 kV IJUI 2 PARA IJUI 1 | DIT | 011/2010 | IPCA | RPEC | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$150,505.79 | 6/1/2025 | Ativa | T2010-078-B | Contrato de Concessão nº 011/2010SE Ijuí 2 230/69 kV - RPEC *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Sul | IJUI 2 | EL 69 kV IJUI 2 PARA DEMEI | DIT | 011/2010 | IPCA | RPEC | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$150,505.79 | 6/1/2025 | Ativa | T2010-078-B | Contrato de Concessão nº 011/2010SE Ijuí 2 230/69 kV - RPEC *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Sul | IJUI 2 | EL 69 kV IJUI 2 CERILUZ 3 | DIT | 011/2010 | IPCA | RCDM | REN 1020/2022 | 5/5/2021 | 5/4/2049 | R$574,399.94 | 6/1/2025 | Ativa | 01 Entrada de linha 69 kV, arranjo barra P e T, referente à LI 69 kV Ceriluz 3 - Ijuí 2 na SE Ijuí 2 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2023 - 2024 | ||||
| AXIA Energia Sul | IJUI 2 | EL 69 kV IJUI 2 CERILUZ | DIT | 011/2010 | IPCA | RPEC | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$150,505.79 | 6/1/2025 | Ativa | T2010-078-B | Contrato de Concessão nº 011/2010SE Ijuí 2 230/69 kV - RPEC *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Norte | IMPERATRIZ | TT 69/0 kV IMPERATRIZ TT3 MA | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$105,427.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | IMPERATRIZ | TT 69/0 kV IMPERATRIZ TT2 MA | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$105,427.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | IMPERATRIZ | TT 69/0 kV IMPERATRIZ TT1 MA | DIT | 058/2001 | IPCA | RCDM | REN 443/2011 | 11/28/2019 | 3/15/2049 | R$507,355.07 | 6/1/2025 | Ativa | Obra de Substituição Completa - Substituição do transformador de aterramento 69 kV por outro de 69 kV- 6 ohms, incluindo 1 chave seccionadora, 3 para-raios, 6 isoladores de pedestal e 1 painel SPCS - Potência do Tranformador de Aterramento: 14,22 MVA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Norte | IMPERATRIZ | TT 69/0 kV IMPERATRIZ TT1 MA | DIT | 058/2001 | IPCA | RMEL | REN 905/2020 | 12/17/2020 | 12/20/2050 | R$103,619.02 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | IMPERATRIZ | TR 500/230 kV IMPERATRIZ TRR1 MA | RB | FT TR 500/230 kV IMPERATRIZ TRR1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$741,890.60 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | TR 500/230 kV IMPERATRIZ TRR1 MA | RB | FT TR 500/230 kV IMPERATRIZ TRR1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,610,587.91 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | TR 500/230 kV IMPERATRIZ TRR1 MA | RB | FT TR 500/230 kV IMPERATRIZ TRR1 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 3/14/2022 | 3/16/2052 | R$38,821.94 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | TR 500/230 kV IMPERATRIZ TR2 MA | RB | FT TR 500/230 kV IMPERATRIZ TR2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,021,710.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | TR 500/230 kV IMPERATRIZ TR2 MA | RB | FT TR 500/230 kV IMPERATRIZ TR2 MA | 058/2001 | IPCA | RMEL | REN 443/2011 | 2/18/2017 | 2/17/2032 | R$7,865.48 | 6/1/2025 | Ativa | Implantação de sistema de medição e monitoramento on-line de Buchas Condensivas do equipamento IZAT7-02 para integrar ao SISTEMA DE SUPERVISÃO SAGE. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | TR 500/230 kV IMPERATRIZ TR1 MA | RB | FT TR 500/230 kV IMPERATRIZ TR1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,225,671.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | TR 500/230 kV IMPERATRIZ TR1 MA | RB | FT TR 500/230 kV IMPERATRIZ TR1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,831,763.72 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | TR 500/230 kV IMPERATRIZ TR1 MA | RB | FT TR 500/230 kV IMPERATRIZ TR1 MA | 058/2001 | IPCA | RMEL | REN 443/2011 | 5/4/2017 | 5/3/2032 | R$23,602.69 | 6/1/2025 | Ativa | Implantação de sistema de medição e monitoramento on-line de Buchas Condensivas do equipamento IZAT7-01 para integrar ao SISTEMA DE SUPERVISÃO SAGE. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | TR 500/230 kV IMPERATRIZ TR1 MA | RB | FT TR 500/230 kV IMPERATRIZ TR1 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 6/22/2016 | 12/10/2050 | R$548,158.97 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | TR 500/230 kV IMPERATRIZ TR1 MA | RB | FT TR 500/230 kV IMPERATRIZ TR1 MA | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 3/15/2019 | 2/20/2054 | R$352,261.60 | 6/1/2025 | Ativa | REVITALIZACAO COMPLETA DO AUTOTRANSFORMADOR Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | TR 230/69 kV IMPERATRIZ TR4 MA | RBF | FT TR 230/69 kV IMPERATRIZ TR4 MA | 058/2001 | IPCA | RBNIA | DSP 3019/2024 | R$ 2,080,494.74 | 6/1/2025 | Prevista | T2024-151 | Instalar, na SE IMPERATRIZ, de uma transformação trifásica TR4 230/69-13,8 KV - 100 MVA. | ||||
| AXIA Energia Norte | IMPERATRIZ | TR 230/69 kV IMPERATRIZ TR3 MA | RBF | FT TR 230/69 kV IMPERATRIZ TR3 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$421,097.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | TR 230/69 kV IMPERATRIZ TR2 MA | RBF | FT TR 230/69 kV IMPERATRIZ TR2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$421,097.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | TR 230/69 kV IMPERATRIZ TR2 MA | RBF | FT TR 230/69 kV IMPERATRIZ TR2 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$914,171.16 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | TR 230/69 kV IMPERATRIZ TR2 MA | RBF | FT TR 230/69 kV IMPERATRIZ TR2 MA | 058/2001 | IPCA | RMELP | DSP 853/2024 | R$ 2,149,063.73 | 6/1/2025 | Prevista | T2024-070 | Obra de Substituição Completa: Substituição do Transformador Trifásico - 230/69/13,8 kV, 100 MVA - IZTF6-04 na SE Imperatriz. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia Norte | IMPERATRIZ | TR 230/69 kV IMPERATRIZ TR2 MA | RBF | FT TR 230/69 kV IMPERATRIZ TR2 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 2/6/2015 | 7/16/2044 | R$34,390.00 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | TR 230/69 kV IMPERATRIZ TR1 MA | RBF | FT TR 230/69 kV IMPERATRIZ TR1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$421,097.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | TR 230/69 kV IMPERATRIZ TR1 MA | RBF | FT TR 230/69 kV IMPERATRIZ TR1 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 8/14/2017 | 9/1/2046 | R$65,375.81 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | TR 230/13,8 kV IMPERATRIZ TRR1 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$251,660.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | TR 230/13,8 kV IMPERATRIZ TF2 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS3 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$754,968.85 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | TR 230/13,8 kV IMPERATRIZ TF2 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS3 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,638,979.80 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | TR 230/13,8 kV IMPERATRIZ TF2 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS3 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,571,940.65 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | TR 230/13,8 kV IMPERATRIZ TF2 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS3 MA | 058/2001 | IPCA | RMEL | REN 443/2011 | 1/19/2017 | 1/18/2032 | R$18,400.92 | 6/1/2025 | Ativa | Implantação de sistema de medição e monitoramento on-line de Buchas Condensivas do equipamento IZTF6-02 para integrar ao SISTEMA DE SUPERVISÃO SAGE. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | TR 230/13,8 kV IMPERATRIZ TF2 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS3 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/19/2020 | 11/18/2044 | R$31,310.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | TR 230/13,8 kV IMPERATRIZ TF1 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$754,968.85 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | TR 230/13,8 kV IMPERATRIZ TF1 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,638,979.80 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | TR 230/13,8 kV IMPERATRIZ TF1 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS1 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/19/2020 | 11/18/2044 | R$31,310.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | TR 230/13,8 kV IMPERATRIZ TF1 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS1 MA | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 12/19/2017 | 12/18/2032 | R$24,113.10 | 6/1/2025 | Ativa | Implantacao de sistema de medicao e monitoramento online de Buchas Condensivas do equipamento IZTF601 para integrar ao SISTEMA DE SUPERVISAO SAGE Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | RTN 69 kV 0 Mvar IMPERATRIZ RN4 MA | RB | FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$16,446.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | RTN 69 kV 0 Mvar IMPERATRIZ RN4 MA | RB | FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 7/8/2021 | 7/7/2045 | R$3,315.35 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | RTN 69 kV 0 Mvar IMPERATRIZ RN2 MA | RB | FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$16,446.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | RTN 69 kV 0 Mvar IMPERATRIZ RN12 MA | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$16,446.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | RTL 500 kV 50 Mvar IMPERATRIZ RTR5 MA | RB | FT RTL 500 kV 50 Mvar IMPERATRIZ RTR5 MA | 058/2001 | IPCA | RMEL | REA 9918/2021 | 1/17/2024 | 1/16/2056 | R$707,220.88 | 6/1/2025 | Ativa | T2021-016 | Obra de Substituição Completa - Substituição, na SE IMPERATRIZ, de um Banco de Reatores de Linha Monofásicos RTR5 500 kV -50Mvar.As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Norte | IMPERATRIZ | RTL 500 kV 45,45 Mvar IMPERATRIZ RTR6 MA | RB | FT RTL 500 kV 45,45 Mvar IMPERATRIZ RTR6 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$298,162.12 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | RTL 500 kV 45,45 Mvar IMPERATRIZ RTR6 MA | RB | FT RTL 500 kV 45,45 Mvar IMPERATRIZ RTR6 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$647,287.22 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | RTL 500 kV 45,45 Mvar IMPERATRIZ RTR6 MA | RB | FT RTL 500 kV 45,45 Mvar IMPERATRIZ RTR6 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$620,811.24 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | RTL 500 kV 45,45 Mvar IMPERATRIZ RTR6 MA | RB | FT RTL 500 kV 45,45 Mvar IMPERATRIZ RTR6 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 2/18/2021 | 8/17/2053 | R$69,463.90 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | RTL 500 kV 33,3 Mvar IMPERATRIZ RTR4 MA | RB | FT RTL 500 kV 33,3 Mvar IMPERATRIZ RTR4 MA | 058/2001 | IPCA | RMEL | REA 9918/2021 | 10/2/2023 | 10/1/2059 | R$668,425.32 | 6/1/2025 | Ativa | T2021-018 | Obra de Substituição Completa - Substituição, na SE IMPERATRIZ, de um Banco de Reatores de Linha Monofásicos RTR4 500 kV - 33,3 Mvar. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Norte | IMPERATRIZ | RTL 500 kV 150 Mvar IMPERATRIZ RT2 MA | RB | FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA | 058/2001 | IPCA | RMEL | REA 11450/2022 | 8/13/2024 | 8/12/2060 | R$ 2,640,269.52 | 6/1/2025 | Ativa | T2022-039 | Obra de Substituição Completa - Substituir na SE Imperatriz o reator monofásico - RT2 - 500 kV - 3x50 MVAr por outro de 3x50 MVAr.As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Norte | IMPERATRIZ | RTL 500 kV 150 Mvar IMPERATRIZ RT1 MA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA | 058/2001 | IPCA | RMEL | REA 9918/2021 | 1/22/2024 | 1/21/2056 | R$ 2,121,662.63 | 6/1/2025 | Ativa | T2021-016 | Obra de Substituição Completa - Substituição, na SE IMPERATRIZ, de um Banco de Reatores de Linha Monofásicos RT1 500 kV - 3x50 Mvar.As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Norte | IMPERATRIZ | RTL 500 kV 136 Mvar IMPERATRIZ RT4 MA | RB | FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$893,734.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | RTL 500 kV 136 Mvar IMPERATRIZ RT4 MA | RB | FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,940,228.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | RTL 500 kV 136 Mvar IMPERATRIZ RT4 MA | RB | FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,860,867.52 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | RTL 500 kV 136 Mvar IMPERATRIZ RT4 MA | RB | FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 12/19/2017 | 12/18/2032 | R$20,127.11 | 6/1/2025 | Ativa | Implantacao de sistema de medicao e monitoramento online de Buchas Condensivas do equipamento IZRE709 para integrar ao SISTEMA DE SUPERVISAO SAGE Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | RTL 500 kV 136 Mvar IMPERATRIZ RT12 MA | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$893,734.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | RTL 500 kV 136 Mvar IMPERATRIZ RT12 MA | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,940,228.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | RTL 500 kV 136 Mvar IMPERATRIZ RT12 MA | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,860,867.52 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | RTL 500 kV 136 Mvar IMPERATRIZ RT12 MA | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RMEL | REN 443/2011 | 6/4/2017 | 6/3/2032 | R$15,591.30 | 6/1/2025 | Ativa | Implantação de sistema de medição e monitoramento on-line de Buchas Condensivas do equipamento IZRE7-12 para integrar ao SISTEMA DE SUPERVISÃO SAGE. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | RTL 500 kV 136 Mvar IMPERATRIZ RT12 MA | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 10/3/2019 | 10/19/2048 | R$5,327.87 | 6/1/2025 | Ativa | MODERNIZAÇÃO - INTERFACE HUMANO MAQUINA - IHM MOD. 65536 Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | RTL 500 kV 100 Mvar IMPERATRIZ RT3 MA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | 058/2001 | IPCA | RMEL | REA 9918/2021 | 9/25/2023 | 9/24/2059 | R$ 2,005,275.97 | 6/1/2025 | Ativa | T2021-018 | Obra de Substituição Completa - Substituição, na SE IMPERATRIZ, de um Banco de Reatores de Linha Monofásicos RT3 500 kV - 100 Mvar. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Norte | IMPERATRIZ | RTB 500 kV 54,4 Mvar IMPERATRIZ RTR14 MA | RB | FT RTB 500 kV 54,4 Mvar IMPERATRIZ RTR14 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$315,697.76 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | RTB 500 kV 54,4 Mvar IMPERATRIZ RTR14 MA | RB | FT RTB 500 kV 54,4 Mvar IMPERATRIZ RTR14 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 5/1/2013 | 4/10/2049 | R$26,498.17 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | RTB 500 kV 45,3 Mvar IMPERATRIZ RTR6 MA | RB | FT RTB 500 kV 45,3 Mvar IMPERATRIZ RTR6 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,839.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | RTB 500 kV 45,3 Mvar IMPERATRIZ RTR6 MA | RB | FT RTB 500 kV 45,3 Mvar IMPERATRIZ RTR6 MA | 058/2001 | IPCA | RMELP | REA 11450/2022 | R$842,714.73 | 6/1/2025 | Prevista | T2022-041 | Obra de Substituição Completa - Substituir na SE Imperatriz o reator monofásico reserva- RTR6 - 500 kV - 1x45,33 MVAr por outro de 1x45,33 MVAr.As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia Norte | IMPERATRIZ | RTB 500 kV 45,3 Mvar IMPERATRIZ RTR6 MA | RB | FT RTB 500 kV 45,3 Mvar IMPERATRIZ RTR6 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/17/2020 | 10/27/2056 | R$23,932.87 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | RTB 500 kV 165 Mvar IMPERATRIZ RT14 MA | RB | FT RTB 500 kV 165 Mvar IMPERATRIZ RT14 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$950,303.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA | RB | FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$950,303.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA | RB | FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,063,036.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA | RB | FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,978,652.17 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA | RB | FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA | 058/2001 | IPCA | RMEL | REN 443/2011 | 1/20/2017 | 1/19/2032 | R$15,361.79 | 6/1/2025 | Ativa | Implantação de sistema de medição e monitoramento on-line de Buchas Condensivas do equipamento IZRE7-11 para integrar ao SISTEMA DE SUPERVISÃO SAGE. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA | RB | FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 2/9/2022 | 1/17/2057 | R$35,749.32 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA | RB | FT RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$893,734.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA | RB | FT RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,940,228.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA | RB | FT RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,860,867.52 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA | RB | FT RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA | 058/2001 | IPCA | RMELP | REA 11450/2022 | R$ 2,533,863.74 | 6/1/2025 | Prevista | T2022-040 | Obra de Substituição Completa - Substituir na SE Imperatriz o reator monofásico - RT6 - 500 kV - 3x45,33 MVAr por outro de 3x45,33 MVAr.As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia Norte | IMPERATRIZ | RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA | RB | FT RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/17/2020 | 10/27/2056 | R$134,959.33 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | MG 500 kV IMPERATRIZ MG2 MA | RB | FT MG 500 kV IMPERATRIZ MG2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,734,351.51 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MG 500 kV IMPERATRIZ MG2 MA | RB | FT MG 500 kV IMPERATRIZ MG2 MA | 058/2001 | IPCA | RBNI | REA 2040/2009 | 6/29/2017 | 7/18/2045 | R$52,717.69 | 6/1/2025 | Ativa | Instalação de módulo de infraestrutura de manobra MIM associado à entradas de linha em 69kV, destinada a conexão de linha na SE Santa Rita * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | MG 500 kV IMPERATRIZ MG2 MA | RB | FT MG 500 kV IMPERATRIZ MG2 MA | 058/2001 | IPCA | RBNI | REN 443/2011 | 10/27/2017 | 11/15/2045 | R$53,207.65 | 6/1/2025 | Ativa | Instalação de módulo de infraestrutura de manobra MIM associado à entradas de linha em 69kV, destinada a conexão de linha na SE Imperatriz * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | MG 500 kV IMPERATRIZ MG2 MA | RB | FT MG 500 kV IMPERATRIZ MG2 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 3/6/2013 | 3/20/2040 | R$ 2,019,034.73 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | MG 500 kV IMPERATRIZ MG2 MA | RB | FT MG 500 kV IMPERATRIZ MG2 MA | 058/2001 | IPCA | RBNIA | DSP 3019/2024 | R$185,707.57 | 6/1/2025 | Prevista | T2024-151 | Módulo de Infraestrutura 230 kV associado à instalação do 4º Transformador de Potência Trifásico 230/69 kV de 100 MVA na SE Imperatriz | ||||
| AXIA Energia Norte | IMPERATRIZ | MG 500 kV IMPERATRIZ MG2 MA | RB | FT MG 500 kV IMPERATRIZ MG2 MA | 058/2001 | IPCA | RBNIA | DSP 3019/2024 | R$53,476.25 | 6/1/2025 | Prevista | T2024-151 | Módulo de Infraestrutura 69 kV associado à instalação do 4º Transformador de Potência Trifásico 230/69 kV de 100 MVA na SE Imperatriz | ||||
| AXIA Energia Norte | IMPERATRIZ | MG 500 kV IMPERATRIZ MG2 MA | RB | FT MG 500 kV IMPERATRIZ MG2 MA | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 11/17/2020 | 11/16/2037 | R$16,196.47 | 6/1/2025 | Ativa | Adequacao e implantacao de Sistemas de Supervisao Controle e Automacao dos servicos auxiliares CACC Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | MG 500 kV IMPERATRIZ MG2 MA | RB | FT MG 500 kV IMPERATRIZ MG2 MA | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 10/18/2019 | 10/20/2049 | R$58,112.32 | 6/1/2025 | Ativa | REVITALIZACAO DE PAINEL DE MEDICAO FASORIAL - QDRF502 FAB. REASON Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | MC 69 kV TT 69/0 kV IMPERATRIZ TT3 MA | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$31,250.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | IMPERATRIZ | MC 69 kV TT 69/0 kV IMPERATRIZ TT2 MA | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$31,250.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | IMPERATRIZ | MC 69 kV TT 69/0 kV IMPERATRIZ TT1 MA | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$31,250.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | IMPERATRIZ | MC 69 kV TR 230/69 kV IMPERATRIZ TR4 MA | RBF | FT TR 230/69 kV IMPERATRIZ TR4 MA | 058/2001 | IPCA | RBNIA | DSP 3019/2024 | R$562,304.61 | 6/1/2025 | Prevista | T2024-151 | Instalar, na SE IMPERATRIZ, um módulo de conexão, em 69 kV, para o transformador trifásico TR4 230/69 kV - 100 MVA, arranjo Barra Principal e Transferência. | ||||
| AXIA Energia Norte | IMPERATRIZ | MC 69 kV TR 230/69 kV IMPERATRIZ TR3 MA | RBF | FT TR 230/69 kV IMPERATRIZ TR3 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$74,722.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 69 kV TR 230/69 kV IMPERATRIZ TR3 MA | RBF | FT TR 230/69 kV IMPERATRIZ TR3 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 5/8/2019 | 5/10/2049 | R$4,225.50 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | MC 69 kV TR 230/69 kV IMPERATRIZ TR2 MA | RBF | FT TR 230/69 kV IMPERATRIZ TR2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$74,722.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 69 kV TR 230/69 kV IMPERATRIZ TR2 MA | RBF | FT TR 230/69 kV IMPERATRIZ TR2 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 9/30/2012 | 9/29/2040 | R$161,569.12 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | MC 69 kV TR 230/69 kV IMPERATRIZ TR1 MA | RBF | FT TR 230/69 kV IMPERATRIZ TR1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$74,722.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 69 kV TR 230/69 kV IMPERATRIZ TR1 MA | RBF | FT TR 230/69 kV IMPERATRIZ TR1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$162,216.23 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 69 kV TR 230/69 kV IMPERATRIZ TR1 MA | RBF | FT TR 230/69 kV IMPERATRIZ TR1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$155,581.11 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 69 kV TR 230/69 kV IMPERATRIZ TR1 MA | RBF | FT TR 230/69 kV IMPERATRIZ TR1 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 3/6/2013 | 4/9/2041 | R$178,962.85 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | MC 500 kV TR 500/230 kV IMPERATRIZ TR2 MA | RB | FT TR 500/230 kV IMPERATRIZ TR2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$494,028.38 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 500 kV TR 500/230 kV IMPERATRIZ TR1 MA | RB | FT TR 500/230 kV IMPERATRIZ TR1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$494,028.38 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 500 kV TR 500/230 kV IMPERATRIZ TR1 MA | RB | FT TR 500/230 kV IMPERATRIZ TR1 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 5/22/2013 | 12/30/2040 | R$204,407.14 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | MC 500 kV RTL 500 kV 150 Mvar IMPERATRIZ RT2 MA | RB | FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$299,304.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 500 kV RTL 500 kV 150 Mvar IMPERATRIZ RT2 MA | RB | FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 6/28/2017 | 4/23/2044 | R$172,714.08 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | MC 500 kV RTL 500 kV 150 Mvar IMPERATRIZ RT1 MA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$299,304.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 500 kV RTL 500 kV 150 Mvar IMPERATRIZ RT1 MA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 7/19/2014 | 8/25/2041 | R$89,548.08 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | MC 500 kV RTL 500 kV 136 Mvar IMPERATRIZ RT4 MA | RB | FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$299,304.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 500 kV RTL 500 kV 136 Mvar IMPERATRIZ RT4 MA | RB | FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/3/2016 | 9/14/2045 | R$147,243.32 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | MC 500 kV RTL 500 kV 136 Mvar IMPERATRIZ RT12 MA | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$299,304.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 500 kV RTL 500 kV 100 Mvar IMPERATRIZ RT3 MA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$299,304.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 500 kV RTL 500 kV 100 Mvar IMPERATRIZ RT3 MA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 7/4/2014 | 8/17/2041 | R$91,559.13 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | MC 500 kV RTB 500 kV 165 Mvar IMPERATRIZ RT14 MA | RB | FT RTB 500 kV 165 Mvar IMPERATRIZ RT14 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$299,304.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 500 kV RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA | RB | FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$462,556.47 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 500 kV RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA | RB | FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,004,174.82 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 500 kV RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA | RB | FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$963,101.07 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 500 kV RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA | RB | FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 12/30/2020 | 12/29/2044 | R$22,259.46 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | MC 500 kV RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA | RB | FT RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$462,556.47 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 500 kV RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA | RB | FT RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,004,174.82 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 500 kV RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA | RB | FT RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 9/30/2012 | 9/29/2040 | R$26,962.73 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | MC 500 kV CR 500 kV 451 Mvar IMPERATRIZ BC2 MA | RB | FT CR 500 kV 451 Mvar IMPERATRIZ BC2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$462,556.47 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 500 kV CR 500 kV 390 Mvar IMPERATRIZ BC1 MA | RB | FT CR 500 kV 390 Mvar IMPERATRIZ BC1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$462,556.47 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 500 kV CR 500 kV 161 Mvar IMPERATRIZ BC4 MA | RB | FT CR 500 kV 161 Mvar IMPERATRIZ BC4 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$462,556.47 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 500 kV CR 500 kV 107 Mvar IMPERATRIZ BC3 MA | RB | FT CR 500 kV 107 Mvar IMPERATRIZ BC3 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$462,556.47 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 230 kV TR 500/230 kV IMPERATRIZ TR2 MA | RB | FT TR 500/230 kV IMPERATRIZ TR2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$193,043.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 230 kV TR 500/230 kV IMPERATRIZ TR1 MA | RB | FT TR 500/230 kV IMPERATRIZ TR1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$193,043.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 230 kV TR 500/230 kV IMPERATRIZ TR1 MA | RB | FT TR 500/230 kV IMPERATRIZ TR1 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 9/30/2012 | 9/29/2040 | R$170,973.18 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | MC 230 kV TR 230/69 kV IMPERATRIZ TR4 MA | RBF | FT TR 230/69 kV IMPERATRIZ TR4 MA | 058/2001 | IPCA | RBNIA | DSP 3019/2024 | R$ 1,670,620.75 | 6/1/2025 | Prevista | T2024-151 | Instalar, na SE IMPERATRIZ, um módulo de conexão, em 230 kV, para o transformador trifásico TR4 230/69 kV - 100 MVA, arranjo Barra Dupla a Cinco Chaves. | ||||
| AXIA Energia Norte | IMPERATRIZ | MC 230 kV TR 230/69 kV IMPERATRIZ TR3 MA | RBF | FT TR 230/69 kV IMPERATRIZ TR3 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$193,043.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 230 kV TR 230/69 kV IMPERATRIZ TR3 MA | RBF | FT TR 230/69 kV IMPERATRIZ TR3 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 9/30/2012 | 9/29/2040 | R$19,997.76 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | MC 230 kV TR 230/69 kV IMPERATRIZ TR2 MA | RBF | FT TR 230/69 kV IMPERATRIZ TR2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$193,043.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 230 kV TR 230/69 kV IMPERATRIZ TR2 MA | RBF | FT TR 230/69 kV IMPERATRIZ TR2 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 12/21/2012 | 11/7/2040 | R$333,575.13 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | MC 230 kV TR 230/69 kV IMPERATRIZ TR1 MA | RBF | FT TR 230/69 kV IMPERATRIZ TR1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$193,043.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 230 kV TR 230/69 kV IMPERATRIZ TR1 MA | RBF | FT TR 230/69 kV IMPERATRIZ TR1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$419,083.35 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 230 kV TR 230/69 kV IMPERATRIZ TR1 MA | RBF | FT TR 230/69 kV IMPERATRIZ TR1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$401,941.59 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 230 kV TR 230/69 kV IMPERATRIZ TR1 MA | RBF | FT TR 230/69 kV IMPERATRIZ TR1 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 5/12/2013 | 1/18/2041 | R$363,761.45 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | MC 230 kV TR 230/13,8 kV IMPERATRIZ TF2 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS3 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$193,043.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 230 kV TR 230/13,8 kV IMPERATRIZ TF2 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS3 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$419,083.35 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 230 kV TR 230/13,8 kV IMPERATRIZ TF2 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS3 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 9/30/2012 | 9/29/2040 | R$362,160.69 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | MC 230 kV TR 230/13,8 kV IMPERATRIZ TF1 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$193,043.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 230 kV TR 230/13,8 kV IMPERATRIZ TF1 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS1 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 9/30/2012 | 9/29/2040 | R$369,207.86 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | MC 13,8 kV CS 100/-70 Mvar IMPERATRIZ CS3 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS3 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$71,981.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 13,8 kV CS 100/-70 Mvar IMPERATRIZ CS2 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$71,981.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | MC 13,8 kV CS 100/-70 Mvar IMPERATRIZ CS1 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$71,981.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | IB 69 kV MG 500 kV IMPERATRIZ MG2 MA IB1 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$50,221.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | IMPERATRIZ | IB 69 kV MG 500 kV IMPERATRIZ MG2 MA IB1 | DIT | 058/2001 | IPCA | RMEL | REN 905/2020 | 9/30/2012 | 9/29/2040 | R$97,827.05 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | IMPERATRIZ | IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB5 | RB | FT MG 500 kV IMPERATRIZ MG2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$524,269.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB5 | RB | FT MG 500 kV IMPERATRIZ MG2 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,138,149.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB5 | RB | FT MG 500 kV IMPERATRIZ MG2 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,091,595.86 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB4 | RB | FT MG 500 kV IMPERATRIZ MG2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$524,269.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB4 | RB | FT MG 500 kV IMPERATRIZ MG2 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,138,149.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB4 | RB | FT MG 500 kV IMPERATRIZ MG2 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 9/30/2012 | 9/29/2040 | R$34,889.65 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB3 | RB | FT MG 500 kV IMPERATRIZ MG2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$524,269.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB3 | RB | FT MG 500 kV IMPERATRIZ MG2 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 3/10/2018 | 5/25/2047 | R$111,592.20 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB2 | RB | FT MG 500 kV IMPERATRIZ MG2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$524,269.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB2 | RB | FT MG 500 kV IMPERATRIZ MG2 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 5/4/2020 | 10/14/2051 | R$312,487.34 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | IB 230 kV MG 500 kV IMPERATRIZ MG2 MA IB1 | RB | FT MG 500 kV IMPERATRIZ MG2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$158,618.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | EL 69 kV IMPERATRIZ SANTA RITA | DIT | 058/2001 | IPCA | RCDM | REA 2040/2009 | 6/29/2017 | 6/28/2047 | R$419,122.85 | 6/1/2025 | Ativa | Entradas de linha em 69kV, destinada a conexão de linha na SE Santa Rita * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Norte | IMPERATRIZ | EL 69 kV IMPERATRIZ SANTA RITA | DIT | 058/2001 | IPCA | RMEL | REN 905/2020 | 5/7/2019 | 5/9/2049 | R$24,272.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | IMPERATRIZ | EL 69 kV IMPERATRIZ IMPERATRIZ | DIT | 058/2001 | IPCA | RCDM | REN 443/2011 | 10/27/2017 | 5/11/2049 | R$421,926.70 | 6/1/2025 | Ativa | Entradas de linha em 69kV, destinada a conexão de linha na SE Imperatriz * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Norte | IMPERATRIZ | EL 69 kV IMPERATRIZ IMPERATRIZ | DIT | 058/2001 | IPCA | RMEL | REN 905/2020 | 12/29/2020 | 3/5/2053 | R$95,848.60 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | IMPERATRIZ | EL 69 kV IMPERATRIZ DIST6 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$87,355.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | IMPERATRIZ | EL 69 kV IMPERATRIZ DIST5 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$87,355.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | IMPERATRIZ | EL 69 kV IMPERATRIZ DIST4 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$87,355.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | IMPERATRIZ | EL 69 kV IMPERATRIZ DIST4 | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$189,642.61 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | IMPERATRIZ | EL 69 kV IMPERATRIZ DIST4 | DIT | 058/2001 | IPCA | RMEL | REN 905/2020 | 5/7/2019 | 5/9/2049 | R$24,272.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | IMPERATRIZ | EL 69 kV IMPERATRIZ DIST3 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$87,355.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | IMPERATRIZ | EL 69 kV IMPERATRIZ DIST2 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$87,355.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | IMPERATRIZ | EL 69 kV IMPERATRIZ DIST2 | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$189,642.61 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | IMPERATRIZ | EL 69 kV IMPERATRIZ DIST1 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$87,355.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | IMPERATRIZ | EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA | RB | FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$559,746.88 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA | RB | FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,215,167.79 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA | RB | FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA | 058/2001 | IPCA | RBNI | REA 8314/2019 | 8/24/2021 | 8/23/2049 | R$56,840.99 | 6/1/2025 | Ativa | Implantação de Unidade de Medição Fasorial – PMU e sistema de comunicação associado adicional para transmissão das medidas para o ONS, no bay da LT 500 kV Imperatriz / Presidente Dutra C2. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA | RB | FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 10/11/2015 | 10/15/2043 | R$366,193.92 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA | RB | FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$559,746.88 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA | RB | FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA | 058/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2047 | R$32,502.37 | 6/1/2025 | Ativa | Implantação de Unidade de Medição Fasorial – PMU nos bays das LT 500 kV Imperatriz / Presidente Dutra C-1. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA | RB | FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 6/15/2015 | 9/16/2044 | R$523,842.23 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$559,746.88 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,215,167.79 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | 058/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2047 | R$32,502.37 | 6/1/2025 | Ativa | Implantação de Unidade de Medição Fasorial – PMU nos bays das LT 500 kV Imperatriz / Maraba C-2 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 6/23/2015 | 1/18/2044 | R$313,158.41 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$559,746.88 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA | 058/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2047 | R$32,502.37 | 6/1/2025 | Ativa | Implantação de Unidade de Medição Fasorial – PMU nos bays das LT 500 kV Imperatriz / Maraba C-1 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 10/15/2016 | 7/2/2046 | R$579,458.50 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$559,746.88 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,215,167.79 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,165,463.80 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2047 | R$32,502.37 | 6/1/2025 | Ativa | Implantação de Unidade de Medição Fasorial – PMU nos bays das LT 500 Kv Imperatriz / Colinas C-1. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | EL 230 kV IMPERATRIZ LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA | RB | FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$269,233.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | EL 230 kV IMPERATRIZ LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA | RB | FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$584,485.94 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | EL 230 kV IMPERATRIZ LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA | RB | FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/6/2014 | 9/1/2042 | R$240,922.96 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | CS 100/-70 Mvar IMPERATRIZ CS3 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS3 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,547,882.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | CS 100/-70 Mvar IMPERATRIZ CS3 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS3 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,360,334.65 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | CS 100/-70 Mvar IMPERATRIZ CS3 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS3 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 12/2/2012 | 12/28/2040 | R$ 1,358,211.93 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | CS 100/-70 Mvar IMPERATRIZ CS2 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,547,882.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | CS 100/-70 Mvar IMPERATRIZ CS2 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,360,334.65 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | CS 100/-70 Mvar IMPERATRIZ CS2 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS1 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/30/2012 | 12/25/2040 | R$ 1,375,665.93 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | CS 100/-70 Mvar IMPERATRIZ CS1 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,547,882.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | CS 100/-70 Mvar IMPERATRIZ CS1 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS1 MA | 058/2001 | IPCA | RMEL | REA 5229/2015 | 1/9/2018 | 1/12/2048 | R$264,867.61 | 6/1/2025 | Ativa | T2015-005 | Revitalização do 1º compensandor síncrono da subestação Imperatriz. Por meio da carta PRIR 057, a Eletronorte informou que após a revitalização, a vida útil das partes revitalizadas será elevada em aproximadamente dez anos. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | IMPERATRIZ | CS 100/-70 Mvar IMPERATRIZ CS1 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,360,334.65 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | CS 100/-70 Mvar IMPERATRIZ CS1 MA | RB | FT CS 100/-70 Mvar IMPERATRIZ CS1 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/19/2012 | 12/14/2040 | R$ 1,373,929.74 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | CR 500 kV 451 Mvar IMPERATRIZ BC2 MA | RB | FT CR 500 kV 451 Mvar IMPERATRIZ BC2 MA | 058/2001 | IPCA | RMEL | REA 9918/2021 | 12/11/2023 | 12/10/2043 | R$ 15,039,947.34 | 6/1/2025 | Ativa | T2021-017 | Obra de Substituição Completa - Substituição, na SE IMPERATRIZ, de um Banco de capacitores série BC2 500 kV - 451 Mvar. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Norte | IMPERATRIZ | CR 500 kV 390 Mvar IMPERATRIZ BC1 MA | RB | FT CR 500 kV 390 Mvar IMPERATRIZ BC1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,455,842.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | CR 500 kV 390 Mvar IMPERATRIZ BC1 MA | RB | FT CR 500 kV 390 Mvar IMPERATRIZ BC1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,160,522.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | CR 500 kV 390 Mvar IMPERATRIZ BC1 MA | RB | FT CR 500 kV 390 Mvar IMPERATRIZ BC1 MA | 058/2001 | IPCA | RBNIA | REA 14930/2023 | R$ 18,599,342.93 | 6/1/2025 | Prevista | T2023-154 | Obra de Substituição Completa - Substituir o Banco de Capacitores Série - BC1 da LT 500 kV Imperatriz - Presidente Dutra C1, na SE Imperatriz, de 390 MVAr (1.950 A), por outro de 543 MVAr (mesmo valor ôhmico e 2.300 A). (Rotina Substituição - IdeMdl n° 13907) | ||||
| AXIA Energia Norte | IMPERATRIZ | CR 500 kV 161 Mvar IMPERATRIZ BC4 MA | RB | FT CR 500 kV 161 Mvar IMPERATRIZ BC4 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$653,733.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | CR 500 kV 161 Mvar IMPERATRIZ BC4 MA | RB | FT CR 500 kV 161 Mvar IMPERATRIZ BC4 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,419,204.81 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | CR 500 kV 161 Mvar IMPERATRIZ BC4 MA | RB | FT CR 500 kV 161 Mvar IMPERATRIZ BC4 MA | 058/2001 | IPCA | RBNIA | REA 12546/2022 | R$ 16,067,141.36 | 6/1/2025 | Prevista | T2022-102 | Obra de Substituição Completa - Substituição do Banco de Capacitores Série na CR 500kV 161 MVAr Imperatriz BC4 MA, devido a substituição do banco de capacitores série e conexões, localizadas na saída da linha LT 500 kV Imperatriz-Colinas C1 de 161 MVAr para outro de 324 MVAr. | 4T25 | |||
| AXIA Energia Norte | IMPERATRIZ | CR 500 kV 161 Mvar IMPERATRIZ BC4 MA | RB | FT CR 500 kV 161 Mvar IMPERATRIZ BC4 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/16/2020 | 11/15/2040 | R$50,165.76 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | IMPERATRIZ | CR 500 kV 107 Mvar IMPERATRIZ BC3 MA | RB | FT CR 500 kV 107 Mvar IMPERATRIZ BC3 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$444,724.51 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | IMPERATRIZ | CR 500 kV 107 Mvar IMPERATRIZ BC3 MA | RB | FT CR 500 kV 107 Mvar IMPERATRIZ BC3 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$965,463.00 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | INTEGRADORA | MG 230 kV INTEGRADORA MG1 PA | RB | FT MG 230 kV INTEGRADORA MG1 PA | 058/2001 | IPCA | RBNI | REA 4658/2014 | 9/2/2013 | 12/31/2042 | R$473,672.58 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de módulo de infraestrutura geral em 230 kV e 7 módulos de infraestrutura de manobra, associados a 6 entradas de linha 230 kV e uma interligação de barramentos 230 kV, todos com arranjo barra dupla a quatro chaves; *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | INTEGRADORA | MG 230 kV INTEGRADORA MG1 PA | RB | FT MG 230 kV INTEGRADORA MG1 PA | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 7/3/2019 | 7/2/2036 | R$52,055.58 | 6/1/2025 | Ativa | SUSBTITUICAO DOS BANCOS DE BATERIAS 125 VCC 400 AH Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | INTEGRADORA | IB 230 kV MG 230 kV INTEGRADORA MG1 PA IB1 | RB | FT MG 230 kV INTEGRADORA MG1 PA | 058/2001 | IPCA | RBNI | REA 4658/2014 | 9/2/2013 | 12/31/2042 | R$135,182.17 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de de interligação de barramentos em 230 kV, arranjo barra dupla a quatro chaves; *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | INTEGRADORA | EL 230 kV INTEGRADORA LT 230 kV INTEGRADORA /SERRA DO SOSSEGO C-1 PA | DIT | 058/2001 | IPCA | RCDM | REA 4658/2014 | 9/2/2013 | 12/31/2042 | R$220,629.31 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla a quatro chaves, associada à linha de transmissão 230 kV Integradora / Serra do Sossego. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Norte | INTEGRADORA | EL 230 kV INTEGRADORA LT 230 kV INTEGRADORA /ONCA PUMA C-2 PA | RB | FT LT 230 kV INTEGRADORA /ONCA PUMA C-2 PA | 058/2001 | IPCA | RBNI | REA 4658/2014 | 9/2/2013 | 12/31/2042 | R$220,629.31 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla a quatro chaves, associada à linha de transmissão 230 kV Integradora / Onça Puma – C2; *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | INTEGRADORA | EL 230 kV INTEGRADORA LT 230 kV INTEGRADORA /ONCA PUMA C-1 PA | RB | FT LT 230 kV INTEGRADORA /ONCA PUMA C-1 PA | 058/2001 | IPCA | RBNI | REA 4658/2014 | 9/2/2013 | 12/31/2042 | R$220,629.31 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla a quatro chaves, associada à linha de transmissão 230 kV Integradora / Onça Puma – C1; *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | INTEGRADORA | EL 230 kV INTEGRADORA LT 230 kV CARAJAS /INTEGRADORA C-3 PA | RB | FT LT 230 kV CARAJAS /INTEGRADORA C-3 PA | 058/2001 | IPCA | RBNI | REA 4658/2014 | 9/2/2013 | 12/31/2042 | R$220,629.31 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla a quatro chaves, associada à linha de transmissão 230 kV Carajás / Integradora – C3; *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | INTEGRADORA | EL 230 kV INTEGRADORA LT 230 kV CARAJAS /INTEGRADORA C-2 PA | RB | FT LT 230 kV CARAJAS /INTEGRADORA C-2 PA | 058/2001 | IPCA | RBNI | REA 4658/2014 | 9/2/2013 | 12/31/2042 | R$220,629.31 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla a quatro chaves, associada à linha de transmissão 230 kV Carajás / Integradora – C2; *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | INTEGRADORA | EL 230 kV INTEGRADORA LT 230 kV CARAJAS /INTEGRADORA C-1 PA | RB | FT LT 230 kV CARAJAS /INTEGRADORA C-1 PA | 058/2001 | IPCA | RBNIA | REA 4658/2014 | R$126,074.08 | 6/1/2025 | Prevista | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla a quatro chaves, associada à linha de transmissão 230 kV Carajás / Integradora – C1; ATENÇÃO: Esta RAP só será devida à Eletronorte a partir da transferência da LT 230 kV Carajás / Integradora – C1 pela Vale S.A. à transmissora | |||||
| AXIA Energia Sul | IRATI NORTE | MG 230 kV IRATI NORTE MG2 PR | RB | FT MG 230 kV IRATI NORTE MG2 PR | 057/2001 | IPCA | RBNI | DSP 695/2024 | 7/3/2023 | 7/2/2041 | R$72,907.75 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo Geral de Acessante 230 kV na SE Irati Norte, em função do seccionamento da LT 230 kV Areia - Ponta Grossa. | |||
| AXIA Energia Sul | IRATI NORTE | MG 230 kV IRATI NORTE MG2 PR | RB | FT MG 230 kV IRATI NORTE MG2 PR | 057/2001 | IPCA | RBNI | DSP 695/2024 | 7/3/2023 | 7/2/2054 | R$46,534.09 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 2 Módulos de Infraestrutura de Manobra 230 kV na SE Irati Norte, associados as Entradas de Linha 230kV para as SEs Guarapuava e Ponta Grossa , em função do seccionamento da LT 230 kV Areia - Ponta Grossa C1 na SE Irati Norte. | |||
| AXIA Energia Sul | IRATI NORTE | EL 230 kV IRATI NORTE LT 230 kV IRATI NORTE /PONTA GROSSA C-1 PR | RB | FT LT 230 kV IRATI NORTE /PONTA GROSSA C-1 PR | 057/2001 | IPCA | RBNI | DSP 695/2024 | 7/3/2023 | 7/2/2051 | R$213,519.94 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Irati Norte, associada à Linha de Transmissão 230 kV Ponta Grossa – Irati Norte C1. | |||
| AXIA Energia Sul | IRATI NORTE | EL 230 kV IRATI NORTE LT 230 kV GUARAPUAVA OESTE /IRATI NORTE C-1 PR | RB | FT LT 230 kV GUARAPUAVA OESTE /IRATI NORTE C-1 PR | 057/2001 | IPCA | RBNI | DSP 695/2024 | 7/3/2023 | 7/2/2051 | R$213,519.94 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo barra dupla com quatro chaves, na Subestação Irati Norte, associada à Linha de Transmissão 230 kV Guarapuava Oeste – Irati Norte C1. | |||
| AXIA Energia Nordeste | IRECE | TT 69/13,8 kV IRECE TA1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | IRECE | TT 69/13,8 kV IRECE TA1 BA | DIT | 061/2001 | IPCA | RCDM | DSP 2023/2022 | 7/28/2022 | 7/30/2052 | R$196,548.13 | 6/1/2025 | Ativa | Substituição na SE IRECÊ do Transformador de Aterramento 02A1, 69 kV, de 95,5 Ohm/fase por um de 20 Ohm/fase (12 MVA). Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | IRECE | TR 69/69 kV IRECE TREG3 BA | RBF | FT TR 230/69 kV IRECE TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$166,073.82 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | TR 69/69 kV IRECE TREG2 BA | RBF | FT TR 230/69 kV IRECE TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$166,073.82 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | TR 230/69 kV IRECE TR6 BA | RBF | FT TR 230/69 kV IRECE TR6 BA | 061/2001 | IPCA | RBNI | REA 3965/2013 | 10/11/2019 | 10/14/2053 | R$ 1,424,782.22 | 6/1/2025 | Ativa | T2013-020 | Instalar, na SE Irecê, o 4° transformador trifásico TR6 230/69 kV - 39 MVA.(Receita alterada em razão de alteração de perfil de RAP) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | IRECE | TR 230/69 kV IRECE TR3 BA | RBF | FT TR 230/69 kV IRECE TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,774.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | TR 230/69 kV IRECE TR3 BA | RBF | FT TR 230/69 kV IRECE TR3 BA | 061/2001 | IPCA | RBNIA | REA 14970/2023 | R$ 2,157,287.85 | 6/1/2025 | Prevista | T2023-161 | Obra de Substituição Completa - Substituição do transformador 230/69 kV - 33 MVA (04T3) para 100 MVA (Rotina-Substituição - IdeMdl 7142). | ||||
| AXIA Energia Nordeste | IRECE | TR 230/69 kV IRECE TR2 BA | RBF | FT TR 230/69 kV IRECE TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,774.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | TR 230/69 kV IRECE TR2 BA | RBF | FT TR 230/69 kV IRECE TR2 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 8/20/2017 | 7/28/2052 | R$25,699.22 | 6/1/2025 | Ativa | Substituição de BUCHAS, SE IRE 04T2 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | IRECE | TR 230/69 kV IRECE TR2 BA | RBF | FT TR 230/69 kV IRECE TR2 BA | 061/2001 | IPCA | RBNIA | REA 14970/2023 | R$ 2,157,287.85 | 6/1/2025 | Prevista | T2023-161 | Obra de Substituição Completa - Substituição do transformador230/69 kV - 33 MVA (04T2) para 100 MVA (Rotina-Substituição - IdeMdl 7139). | ||||
| AXIA Energia Nordeste | IRECE | TR 230/69 kV IRECE TR2 BA | RBF | FT TR 230/69 kV IRECE TR2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/14/2022 | 11/21/2057 | R$ 432.40 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | IRECE | TR 230/69 kV IRECE TR1 BA | RBF | FT TR 230/69 kV IRECE TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$209,167.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | TR 230/69 kV IRECE TR1 BA | RBF | FT TR 230/69 kV IRECE TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$586,958.33 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | TR 230/138 kV IRECE TRR1 BA | RBF | FT TR 230/138 kV IRECE TRR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$288,507.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | TR 230/138 kV IRECE TRR1 BA | RBF | FT TR 230/138 kV IRECE TRR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$809,600.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | TR 230/138 kV IRECE TRR1 BA | RBF | FT TR 230/138 kV IRECE TRR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$746,352.76 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | TR 230/138 kV IRECE TR8 BA | RBF | FT TR 230/138 kV IRECE TR8 BA | 061/2001 | IPCA | RBNI | REA 3965/2013 | 12/19/2019 | 2/3/2054 | R$ 1,638,146.00 | 6/1/2025 | Ativa | T2013-019 | Instalar, na SE Irecê, o 3° transformador trifásico TR3 230/138 kV - 55 MVA.(Receita alterada devido à alteração do perfil de plano para decrescente). *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | IRECE | TR 230/138 kV IRECE TR5 BA | RBF | FT TR 230/138 kV IRECE TR5 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$274,486.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | TR 230/138 kV IRECE TR4 BA | RBF | FT TR 230/138 kV IRECE TR4 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$274,486.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | TR 230/138 kV IRECE TR4 BA | RBF | FT TR 230/138 kV IRECE TR4 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$770,255.09 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | TR 230/138 kV IRECE TR4 BA | RBF | FT TR 230/138 kV IRECE TR4 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$710,081.08 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | TR 230/13,8 kV IRECE TR7 BA | RB | FT CS 30/-15 MVAr IRECE CS1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$213,042.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | TR 230/13,8 kV IRECE TR7 BA | RB | FT CS 30/-15 MVAr IRECE CS1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$597,834.30 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | TR 230/13,8 kV IRECE TR7 BA | RB | FT CS 30/-15 MVAr IRECE CS1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$551,130.18 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | RTS 13,8 kV 5 Mvar IRECE RLCC BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | IRECE | RTL 230 kV 5 Mvar IRECE RTR1 BA | RB | FT RTL 230 kV 5 Mvar IRECE RTR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$78,941.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | RTL 230 kV 5 Mvar IRECE RTR1 BA | RB | FT RTL 230 kV 5 Mvar IRECE RTR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$221,524.23 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | RTL 230 kV 15 Mvar IRECE RT1 BA | RB | FT RTL 230 kV 15 MVAr IRECE RT1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$236,825.61 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | RTL 230 kV 15 Mvar IRECE RT1 BA | RB | FT RTL 230 kV 15 MVAr IRECE RT1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$664,572.68 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | RTB 13,8 kV 5 Mvar IRECE RT2 BA | RBF | FT RTB 13,8 kV 5 MVAr IRECE RT2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | RTB 13,8 kV 5 Mvar IRECE RT2 BA | RBF | FT RTB 13,8 kV 5 MVAr IRECE RT2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$351,841.75 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | RTB 13,8 kV 5 Mvar IRECE RT1 BA | RBF | FT RTB 13,8 kV 5 MVAr IRECE RT1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | RTB 13,8 kV 5 Mvar IRECE RT1 BA | RBF | FT RTB 13,8 kV 5 MVAr IRECE RT1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$351,841.75 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MG 230 kV IRECE MG1 BA | RB | FT MG 230 kV IRECE MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$637,135.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MG 230 kV IRECE MG1 BA | RB | FT MG 230 kV IRECE MG1 BA | 061/2001 | IPCA | RBNI | REA 3965/2013 | 12/19/2019 | 8/26/2048 | R$355,455.09 | 6/1/2025 | Ativa | T2013-019 | Complementar, na SE Irecê, o módulo geral para a instalação do 3° transformador trifásico TR8 230/138 kV - 55 MVA.(Receita alterada em razão de mudança de perfil da RAP) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | IRECE | MG 230 kV IRECE MG1 BA | RB | FT MG 230 kV IRECE MG1 BA | 061/2001 | IPCA | RBNI | REA 3965/2013 | 12/19/2019 | 8/5/2048 | R$279,257.05 | 6/1/2025 | Ativa | T2013-020 | Complementar, na SE Irecê, o módulo geral para a instalação do 4° transformador trifásico TR6 230/69 kV - 39 MVA. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | IRECE | MG 230 kV IRECE MG1 BA | RB | FT MG 230 kV IRECE MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 2/10/2014 | 2/9/2031 | R$1,120.81 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCOS DE BATERIAS -48Vcc Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | IRECE | MG 230 kV IRECE MG1 BA | RB | FT MG 230 kV IRECE MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/4/2015 | 12/3/2032 | R$26,938.76 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição das Bateriais Saturnia 60PZS400 250Vcc, Posições 900A1 e 900A2 .Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | IRECE | MG 230 kV IRECE MG1 BA | RB | FT MG 230 kV IRECE MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/31/2015 | 10/30/2043 | R$63,257.96 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SISTEMAS AUTOMÁTICOS DE REGULAÇÃO ASSOCIADOS A TRANSFORMADORES..Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | IRECE | MG 230 kV IRECE MG1 BA | RB | FT MG 230 kV IRECE MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 2/28/2015 | 2/27/2043 | R$42,230.49 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DO CONCENTRADOR DE DADOS PARA ATENDIMENTO AO AUMENTO DA OBSERVABILIDADE ASSOCIADA AO PROCEDIMENTO DE REDE 2.7..Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | IRECE | MG 230 kV IRECE MG1 BA | RB | FT MG 230 kV IRECE MG1 BA | 061/2001 | IPCA | RBNI | REA 2376/2010 | 8/23/2015 | 2/1/2046 | R$118,887.37 | 6/1/2025 | Ativa | MIM referente a Instalação de 1 (uma) EL 138kV para o Projeto Baixios do Irecê - CODEVASF INCLUIDA NO CICLO 2016/2017 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | IRECE | MG 230 kV IRECE MG1 BA | RB | FT MG 230 kV IRECE MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,787,910.29 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MG 230 kV IRECE MG1 BA | RB | FT MG 230 kV IRECE MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,648,234.84 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MG 230 kV IRECE MG1 BA | RB | FT MG 230 kV IRECE MG1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 7/12/2016 | 7/15/2046 | R$3,062.00 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | IRECE | MG 230 kV IRECE MG1 BA | RB | FT MG 230 kV IRECE MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/2/2022 | 11/7/2040 | R$394,862.93 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | IRECE | MC 69 kV TT 69/13,8 kV IRECE TA1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | IRECE | MC 69 kV TR 230/69 kV IRECE TR6 BA | RBF | FT TR 230/69 kV IRECE TR6 BA | 061/2001 | IPCA | RBNI | REA 3965/2013 | 10/11/2019 | 2/4/2049 | R$555,056.60 | 6/1/2025 | Ativa | T2013-020 | Instalar, na SE Irecê, um módulo de conexão, em 69 kV, arranjo barra principal e transferência, para o 3° transformador trifásico TR6 230/69 kV - 39 MVA. (Receita alterada em razão de mudança de perfil de RAP) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | IRECE | MC 69 kV TR 230/69 kV IRECE TR3 BA | RBF | FT TR 230/69 kV IRECE TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MC 69 kV TR 230/69 kV IRECE TR3 BA | RBF | FT TR 230/69 kV IRECE TR3 BA | 061/2001 | IPCA | RBNIA | REA 14970/2023 | R$513,914.00 | 6/1/2025 | Prevista | T2023-161 | Obra de Substituição Completa - Substituição da conexão em 69 kV e arranjo BPT na SE Irecê, associada à substituição do transformador TR3 (04T3) 230/69 kV (Rotina-Substituição - IdeMdl 7144). | ||||
| AXIA Energia Nordeste | IRECE | MC 69 kV TR 230/69 kV IRECE TR2 BA | RBF | FT TR 230/69 kV IRECE TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MC 69 kV TR 230/69 kV IRECE TR2 BA | RBF | FT TR 230/69 kV IRECE TR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MC 69 kV TR 230/69 kV IRECE TR2 BA | RBF | FT TR 230/69 kV IRECE TR2 BA | 061/2001 | IPCA | RBNIA | REA 14970/2023 | R$513,914.00 | 6/1/2025 | Prevista | T2023-161 | Obra de Substituição Completa - Substituição da conexão em 69 kV e arranjo BPT na SE Irecê, associada à substituição do transformador TR2 (04T2) 230/69/13,8 kV (Rotina-Substituição - IdeMdl 7141). | ||||
| AXIA Energia Nordeste | IRECE | MC 69 kV TR 230/69 kV IRECE TR2 BA | RBF | FT TR 230/69 kV IRECE TR2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/30/2021 | 2/1/2050 | R$41,468.04 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | IRECE | MC 69 kV TR 230/69 kV IRECE TR1 BA | RBF | FT TR 230/69 kV IRECE TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MC 69 kV TR 230/69 kV IRECE TR1 BA | RBF | FT TR 230/69 kV IRECE TR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/9/2022 | 7/6/2054 | R$80,481.82 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | IRECE | MC 230 kV TR 230/69 kV IRECE TR6 BA | RBF | FT TR 230/69 kV IRECE TR6 BA | 061/2001 | IPCA | RBNI | REA 3965/2013 | 10/11/2019 | 2/23/2048 | R$ 1,619,517.43 | 6/1/2025 | Ativa | T2013-020 | Instalar, na SE Irecê, um módulo de conexão, em 230 kV, arranjo barra dupla a 5 chaves, para o 4° transformador trifásico TR6 230/69 kV - 39 MVA. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | IRECE | MC 230 kV TR 230/69 kV IRECE TR6 BA | RBF | FT TR 230/69 kV IRECE TR6 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/2/2022 | 5/1/2037 | R$5,820.75 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | IRECE | MC 230 kV TR 230/69 kV IRECE TR3 BA | RBF | FT TR 230/69 kV IRECE TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MC 230 kV TR 230/69 kV IRECE TR3 BA | RBF | FT TR 230/69 kV IRECE TR3 BA | 061/2001 | IPCA | RBNIA | REA 14970/2023 | R$ 1,508,535.04 | 6/1/2025 | Prevista | T2023-161 | Obra de Substituição Completa - Substituição da conexão em 230 kV e arranjo BD5 na SE Irecê, associada à substituição do transformador TR3 (04T3) 230/69 kV (Rotina-Substituição - IdeMdl 7143). | ||||
| AXIA Energia Nordeste | IRECE | MC 230 kV TR 230/69 kV IRECE TR3 BA | RBF | FT TR 230/69 kV IRECE TR3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/2/2022 | 5/1/2037 | R$4,884.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | IRECE | MC 230 kV TR 230/69 kV IRECE TR2 BA | RBF | FT TR 230/69 kV IRECE TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MC 230 kV TR 230/69 kV IRECE TR2 BA | RBF | FT TR 230/69 kV IRECE TR2 BA | 061/2001 | IPCA | RBNIA | REA 14970/2023 | R$ 1,508,535.04 | 6/1/2025 | Prevista | T2023-161 | Obra de Substituição Completa - Substituição da conexão em 230 kV e arranjo BD5 na SE Irecê, associada à substituição do transformador TR2 (04T2) 230/69/13,8 kV (Rotina-Substituição - IdeMdl 7140). | ||||
| AXIA Energia Nordeste | IRECE | MC 230 kV TR 230/69 kV IRECE TR2 BA | RBF | FT TR 230/69 kV IRECE TR2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/7/2021 | 9/29/2052 | R$226,384.61 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | IRECE | MC 230 kV TR 230/69 kV IRECE TR1 BA | RBF | FT TR 230/69 kV IRECE TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MC 230 kV TR 230/69 kV IRECE TR1 BA | RBF | FT TR 230/69 kV IRECE TR1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 7/16/2017 | 7/24/2048 | R$57,910.57 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC 230 kV - 94T1 A/B/C * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | IRECE | MC 230 kV TR 230/69 kV IRECE TR1 BA | RBF | FT TR 230/69 kV IRECE TR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/24/2021 | 11/23/2052 | R$220,456.76 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | IRECE | MC 230 kV TR 230/138 kV IRECE TR8 BA | RBF | FT TR 230/138 kV IRECE TR8 BA | 061/2001 | IPCA | RBNI | REA 3965/2013 | 12/19/2019 | 9/23/2048 | R$ 1,625,466.20 | 6/1/2025 | Ativa | T2013-019 | Instalar, na SE Irecê, um módulo de conexão, em 230 kV, arranjo barra dupla a 5 chaves, para o 3° transformador trifásico TR8 230/138 kV - 55 MVA.(Receita alterada devido à alteração do perfil de plano para decrescente). *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | IRECE | MC 230 kV TR 230/138 kV IRECE TR8 BA | RBF | FT TR 230/138 kV IRECE TR8 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/2/2022 | 5/1/2037 | R$4,884.27 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | IRECE | MC 230 kV TR 230/138 kV IRECE TR5 BA | RBF | FT TR 230/138 kV IRECE TR5 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MC 230 kV TR 230/138 kV IRECE TR5 BA | RBF | FT TR 230/138 kV IRECE TR5 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/10/2020 | 4/24/2044 | R$15,259.27 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | IRECE | MC 230 kV TR 230/138 kV IRECE TR4 BA | RBF | FT TR 230/138 kV IRECE TR4 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MC 230 kV TR 230/138 kV IRECE TR4 BA | RBF | FT TR 230/138 kV IRECE TR4 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$454,511.36 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MC 230 kV TR 230/138 kV IRECE TR4 BA | RBF | FT TR 230/138 kV IRECE TR4 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/25/2021 | 6/24/2044 | R$35,051.95 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | IRECE | MC 230 kV TR 230/13,8 kV IRECE TR7 BA | RB | FT CS 30/-15 MVAr IRECE CS1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MC 230 kV TR 230/13,8 kV IRECE TR7 BA | RB | FT CS 30/-15 MVAr IRECE CS1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/3/2021 | 7/10/2043 | R$10,306.42 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | IRECE | MC 230 kV RTL 230 kV 15 Mvar IRECE RT1 BA | RB | FT RTL 230 kV 15 MVAr IRECE RT1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$91,861.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MC 230 kV RTL 230 kV 15 Mvar IRECE RT1 BA | RB | FT RTL 230 kV 15 MVAr IRECE RT1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$257,778.53 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MC 230 kV CR 230 kV 81 Mvar IRECE BC1 BA | RB | FT CR 230 kV 81 MVAr IRECE BC1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$166,750.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MC 230 kV CR 230 kV 81 Mvar IRECE BC1 BA | RB | FT CR 230 kV 81 MVAr IRECE BC1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/29/2019 | 7/19/2052 | R$20,985.15 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | IRECE | MC 138 kV TR 230/138 kV IRECE TR8 BA | RBF | FT TR 230/138 kV IRECE TR8 BA | 061/2001 | IPCA | RBNI | REA 3965/2013 | 12/19/2019 | 12/18/2047 | R$ 1,132,754.59 | 6/1/2025 | Ativa | T2013-019 | (Receita alterada devido à alteração do perfil de plano para decrescente). *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | IRECE | MC 138 kV TR 230/138 kV IRECE TR5 BA | RBF | FT TR 230/138 kV IRECE TR5 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$112,381.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MC 138 kV TR 230/138 kV IRECE TR4 BA | RBF | FT TR 230/138 kV IRECE TR4 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$112,381.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MC 138 kV TR 230/138 kV IRECE TR4 BA | RBF | FT TR 230/138 kV IRECE TR4 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/16/2021 | 6/15/2045 | R$15,402.79 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | IRECE | MC 13,8 kV TR 230/69 kV IRECE TR2 BA | RBF | FT TR 230/69 kV IRECE TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MC 13,8 kV TR 230/69 kV IRECE TR2 BA | RBF | FT TR 230/69 kV IRECE TR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$125,341.16 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MC 13,8 kV TR 230/13,8 kV IRECE TR7 BA | RB | FT CS 30/-15 MVAr IRECE CS1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MC 13,8 kV RTB 13,8 kV 5 Mvar IRECE RT2 BA | RBF | FT RTB 13,8 kV 5 MVAr IRECE RT2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,598.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MC 13,8 kV RTB 13,8 kV 5 Mvar IRECE RT2 BA | RBF | FT RTB 13,8 kV 5 MVAr IRECE RT2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,662.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MC 13,8 kV RTB 13,8 kV 5 Mvar IRECE RT2 BA | RBF | FT RTB 13,8 kV 5 MVAr IRECE RT2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/21/2022 | 9/20/2037 | R$3,134.65 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | IRECE | MC 13,8 kV RTB 13,8 kV 5 Mvar IRECE RT1 BA | RBF | FT RTB 13,8 kV 5 MVAr IRECE RT1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,598.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MC 13,8 kV RTB 13,8 kV 5 Mvar IRECE RT1 BA | RBF | FT RTB 13,8 kV 5 MVAr IRECE RT1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,662.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MC 13,8 kV RTB 13,8 kV 5 Mvar IRECE RT1 BA | RBF | FT RTB 13,8 kV 5 MVAr IRECE RT1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/20/2022 | 9/19/2037 | R$2,210.30 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | IRECE | MC 13,8 kV CS 30/-15 Mvar IRECE CS1 BA | RB | FT CS 30/-15 MVAr IRECE CS1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$60,394.36 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | MC 13,8 kV CS 30/-15 Mvar IRECE CS1 BA | RB | FT CS 30/-15 MVAr IRECE CS1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$169,476.78 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | IB 69 kV MG 230 kV IRECE MG1 BA IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | IRECE | IB 69 kV MG 230 kV IRECE MG1 BA IB1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$118,244.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | IRECE | IB 230 kV MG 230 kV IRECE MG1 BA IB1 | RB | FT MG 230 kV IRECE MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,085.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | IB 230 kV MG 230 kV IRECE MG1 BA IB1 | RB | FT MG 230 kV IRECE MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$373,459.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | IB 230 kV MG 230 kV IRECE MG1 BA IB1 | RB | FT MG 230 kV IRECE MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$344,284.16 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | IB 138 kV MG 230 kV IRECE MG1 BA IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$86,825.51 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | IRECE | EL 69 kV IRECE DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | IRECE | EL 69 kV IRECE DIST4 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/3/2022 | 2/5/2051 | R$42,694.55 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | IRECE | EL 69 kV IRECE DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | IRECE | EL 69 kV IRECE DIST3 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/3/2022 | 9/9/2055 | R$73,397.40 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | IRECE | EL 69 kV IRECE DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | IRECE | EL 69 kV IRECE DIST2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/10/2022 | 6/29/2054 | R$81,473.65 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | IRECE | EL 69 kV IRECE DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | IRECE | EL 69 kV IRECE DIST1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/7/2022 | 8/3/2054 | R$80,639.55 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | IRECE | EL 230 kV IRECE LT 230 kV OUROLANDIA II /IRECE C-1 BA | RB | FT LT 230 kV OUROLANDIA II /IRECE C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | EL 230 kV IRECE LT 230 kV OUROLANDIA II /IRECE C-1 BA | RB | FT LT 230 kV OUROLANDIA II /IRECE C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | EL 230 kV IRECE LT 230 kV OUROLANDIA II /IRECE C-1 BA | RB | FT LT 230 kV OUROLANDIA II /IRECE C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$584,375.21 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | EL 230 kV IRECE LT 230 kV OUROLANDIA II /IRECE C-1 BA | RB | FT LT 230 kV OUROLANDIA II /IRECE C-1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 4/22/2017 | 4/30/2048 | R$57,498.94 | 6/1/2025 | Ativa | SUBSTITTUIÇÃO DE TC 230 kV - 94F1 A/B/C * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | IRECE | EL 230 kV IRECE LT 230 kV OUROLANDIA II /IRECE C-1 BA | RB | FT LT 230 kV OUROLANDIA II /IRECE C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/2/2022 | 5/1/2037 | R$4,884.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | IRECE | EL 230 kV IRECE LT 230 kV MORRO CHAPEU II /IRECE C-1 BA | RB | FT LT 230 kV MORRO CHAPEU II /IRECE C-1 BA | 009/2011 | IPCA | RBL | CC 009/2011 | 8/6/2017 | 10/13/2041 | R$559,896.80 | 6/1/2025 | Ativa | T2012-031 | * Considerando o adicional de RGR conforme disposto na RH nº 1.150, de 07/06/2011. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | IRECE | EL 230 kV IRECE LT 230 kV IRECE /BROT.MACAUBAS C-1 BA | RB | FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | EL 230 kV IRECE LT 230 kV IRECE /BROT.MACAUBAS C-1 BA | RB | FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | EL 230 kV IRECE LT 230 kV IRECE /BROT.MACAUBAS C-1 BA | RB | FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$584,375.21 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | EL 230 kV IRECE LT 230 kV IRECE /BROT.MACAUBAS C-1 BA | RB | FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 4/23/2017 | 5/1/2048 | R$57,503.80 | 6/1/2025 | Ativa | SUBSTITTUIÇÃO DE TC 230 kV - 94F2 A/B/C * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | IRECE | EL 230 kV IRECE LT 230 kV IRECE /BROT.MACAUBAS C-1 BA | RB | FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/22/2013 | 1/29/2030 | R$161,392.49 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | IRECE | EL 138 kV IRECE BAIXIOS 03N2 | DIT | 061/2001 | IPCA | RCDM | REA 2376/2010 | 8/23/2015 | 8/22/2047 | R$788,877.39 | 6/1/2025 | Ativa | Instalação de 1 (uma) EL 138kV para o Projeto Baixios do Irecê - CODEVASF INCLUIDA NO CICLO 2016/2017 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | IRECE | EL 138 kV IRECE AGUAS BELAS | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$167,571.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | IRECE | EL 138 kV IRECE AGUAS BELAS | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$470,234.30 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | IRECE | EL 138 kV IRECE AGUAS BELAS | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/21/2021 | 6/2/2042 | R$33,210.44 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | IRECE | CS 30/-15 Mvar IRECE CS1 BA | RB | FT CS 30/-15 MVAr IRECE CS1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$820,513.52 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | CS 30/-15 Mvar IRECE CS1 BA | RB | FT CS 30/-15 MVAr IRECE CS1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,302,499.58 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | CS 30/-15 Mvar IRECE CS1 BA | RB | FT CS 30/-15 MVAr IRECE CS1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,122,623.29 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | IRECE | CS 30/-15 Mvar IRECE CS1 BA | RB | FT CS 30/-15 MVAr IRECE CS1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/13/2022 | 12/15/2052 | R$255,183.33 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | IRECE | CR 230 kV 81 Mvar IRECE BC1 BA | RB | FT CR 230 kV 81 MVAr IRECE BC1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$289,590.56 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IRIRI | MG 138 kV IRIRI MG1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$293,554.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IRIRI | MG 138 kV IRIRI MG1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/31/2017 | 3/27/2033 | R$2,005.76 | 6/1/2025 | Ativa | Substituição dos Servidores do Sistema de Supervisão e Controle Local (SAGE) por obsolescência ou por atualização tecnológica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | IRIRI | MG 138 kV IRIRI MG1 RJ | DIT | 062/2001 | IPCA | RCDMA | REA 10203/2021 | R$233,950.37 | 6/1/2025 | Prevista | T2019-066 | Complementação do módulo geral, na SE Iriri, com a instalação de 2 módulos de infraestrutura de manobra de 138 kV. | |||||
| AXIA Energia | IRIRI | IB 138 kV MG 138 kV IRIRI MG1 RJ IB1 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$92,690.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IRIRI | EL 138 kV IRIRI LT 138 kV IRIRI /ROCHA LEAO C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$164,500.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IRIRI | EL 138 kV IRIRI LT 138 kV IRIRI /ROCHA LEAO C-1 RJ | DIT | 062/2001 | IPCA | RCDMA | REA 10203/2021 | R$882,678.06 | 6/1/2025 | Prevista | T2019-066 | Instalar, na SE IRIRI, um módulo de entrada de linha para o circuito LT 138 kV IRIRI /ROCHA LEAO C-1 RJ originado do seccionamento do circuito LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ na SE IRIRI. | |||||
| AXIA Energia | IRIRI | EL 138 kV IRIRI LT 138 kV CAMPOS /IRIRI C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$164,500.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IRIRI | EL 138 kV IRIRI LT 138 kV CAMPOS /IRIRI C-1 RJ | DIT | 062/2001 | IPCA | RCDMA | REA 10203/2021 | R$882,678.06 | 6/1/2025 | Prevista | T2019-066 | Instalar, na SE IRIRI, um módulo de entrada de linha para o circuito LT 138 kV CAMPOS /IRIRI C-1 RJ originado do seccionamento do circuito LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ na SE IRIRI. | |||||
| AXIA Energia | IRIRI | EL 138 kV IRIRI DIST3 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$164,500.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IRIRI | EL 138 kV IRIRI DIST2 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$164,500.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IRIRI | EL 138 kV IRIRI DIST1 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$164,500.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | ITA | RTB 500 kV 50 Mvar ITA RTR1 SC | RB | FT RTB 500 kV 50 Mvar ITA RTR1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$223,201.61 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITA | RTB 500 kV 50 Mvar ITA RTR1 SC | RB | FT RTB 500 kV 50 Mvar ITA RTR1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$391,737.16 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITA | RTB 500 kV 50 Mvar ITA RTR1 SC | RB | FT RTB 500 kV 50 Mvar ITA RTR1 SC | 057/2001 | IPCA | RMELP | REA 13930/2023 | R$963,546.76 | 6/1/2025 | Prevista | T2023-007 | Obra de Substituição Completa - Substituição do reator monofásico, RTR1, 525 kV, 50 Mvar, Fase Reserva 1, SE Itá. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 0001363/2021. | ||||
| AXIA Energia Sul | ITA | RTB 500 kV 150 Mvar ITA RT1 SC | RB | FT RTB 500 kV 150 Mvar ITA RT1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$669,604.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITA | RTB 500 kV 150 Mvar ITA RT1 SC | RB | FT RTB 500 kV 150 Mvar ITA RT1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,175,211.47 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITA | RTB 500 kV 150 Mvar ITA RT1 SC | RB | FT RTB 500 kV 150 Mvar ITA RT1 SC | 057/2001 | IPCA | RMELP | REA 13930/2023 | R$ 2,890,640.28 | 6/1/2025 | Prevista | T2023-006 | Obra de Substituição Completa - Substituição do reator monofásico, RE1, 525 kV, 3x50 Mvar, Fases A, B e C, SE Itá. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 0001352/2021, 0001357/2021 e 0001361/2021. | ||||
| AXIA Energia Sul | ITA | MG 500 kV ITA MG1 SC | RB | FT MG 500 kV ITA MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,204,716.85 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITA | MG 500 kV ITA MG1 SC | RB | FT MG 500 kV ITA MG1 SC | 057/2001 | IPCA | RMEL | REN 443/2011 | 5/30/2015 | 5/29/2032 | R$9,627.61 | 6/1/2025 | Ativa | Aquisição e substituição de um banco de baterias de 125 Vcc - Bat1 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019.*RAP alterada no recurso contra a REH 2.407/2018. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | ITA | MG 500 kV ITA MG1 SC | RB | FT MG 500 kV ITA MG1 SC | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2044 | R$7,043.19 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Caxias, Machadinho, Nova Santa Rita e Salto Santiago. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | ITA | MG 500 kV ITA MG1 SC | RB | FT MG 500 kV ITA MG1 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 9/13/2021 | 9/12/2039 | R$163,945.49 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | ITA | MC 500 kV RTB 500 kV 150 Mvar ITA RT1 SC | RB | FT RTB 500 kV 150 Mvar ITA RT1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$335,783.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITA | MC 500 kV RTB 500 kV 150 Mvar ITA RT1 SC | RB | FT RTB 500 kV 150 Mvar ITA RT1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$589,327.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITA | IB 500 kV MG 500 kV ITA MG4 SC IB7 | RB | FT MG 500 kV ITA MG4 SC | 004/2012 | IPCA | RBL | CC 004/2012 | 8/6/2014 | 5/10/2042 | R$ 1,191,544.84 | 6/1/2025 | Ativa | T2012-074-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Sul | ITA | IB 500 kV MG 500 kV ITA MG1 SC IB6 | RB | FT MG 500 kV ITA MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITA | IB 500 kV MG 500 kV ITA MG1 SC IB6 | RB | FT MG 500 kV ITA MG1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$667,954.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITA | IB 500 kV MG 500 kV ITA MG1 SC IB5 | RB | FT MG 500 kV ITA MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITA | IB 500 kV MG 500 kV ITA MG1 SC IB5 | RB | FT MG 500 kV ITA MG1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$667,954.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITA | IB 500 kV MG 500 kV ITA MG1 SC IB2 | RB | FT MG 500 kV ITA MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITA | IB 500 kV MG 500 kV ITA MG1 SC IB1 | RB | FT MG 500 kV ITA MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITA | EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-2 SC/RS | RB | FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS | 004/2012 | IPCA | RBL | CC 004/2012 | 8/6/2014 | 5/10/2042 | R$ 1,257,469.74 | 6/1/2025 | Ativa | T2012-074-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Sul | ITA | EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-2 SC/RS | RB | FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS | 004/2012 | IPCA | RBNI | REA 5861/2016 | 4/26/2020 | 4/25/2034 | R$32,376.36 | 6/1/2025 | Ativa | Implantação de Unidade de Medição Fasorial – PMU nos bays das LT 525 kV Itá / Nova Santa Rita C-2. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Sul | ITA | EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-2 SC/RS | RB | FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS | 004/2012 | IPCA | RBNI | REA 8314/2019 | 4/26/2020 | 4/25/2034 | R$32,376.36 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU para transmissão das medidas para o ONS, nos bays das LT 525 kV Itá / Nova Santa Rita C-2. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Sul | ITA | EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS | RB | FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITA | EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS | RB | FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$713,154.95 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITA | EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS | RB | FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS | 057/2001 | IPCA | RBNI | REA 3578/2012 | 5/5/2017 | 5/4/2041 | R$38,384.92 | 6/1/2025 | Ativa | Substituição dos para-raios de SiC da LT 525kV Itá - Nova Santa Rita, terminal de Itá, SiC por ZnO. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | ITA | EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS | RB | FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2034 | R$2,952.37 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Caxias, Machadinho, Nova Santa Rita e Salto Santiago. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | ITA | EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS | RB | FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/7/2021 | 1/10/2051 | R$37,420.21 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | ITA | EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-2 PR/SC | RB | FT LT 500 kV S.SANTIAGO /ITA C-2 PR/SC | 004/2012 | IPCA | RBL | CC 004/2012 | 2/4/2014 | 5/10/2042 | R$ 1,257,469.74 | 6/1/2025 | Ativa | T2012-074-C | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Sul | ITA | EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-2 PR/SC | RB | FT LT 500 kV S.SANTIAGO /ITA C-2 PR/SC | 004/2012 | IPCA | RBNI | REA 8314/2019 | 4/26/2020 | 4/25/2034 | R$32,376.36 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU para transmissão das medidas para o ONS, nos bays das LT 525 kV S. Santiago / Itá C-2. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Sul | ITA | EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-2 PR/SC | RB | FT LT 500 kV S.SANTIAGO /ITA C-2 PR/SC | 004/2012 | IPCA | RBNI | REA 5861/2016 | 4/26/2020 | 4/25/2034 | R$32,376.36 | 6/1/2025 | Ativa | Implantação de Unidade de Medição Fasorial – PMU nos bays das LT 525 kV S. Santiago / Itá C-2. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Sul | ITA | EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-1 PR/SC | RB | FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITA | EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-1 PR/SC | RB | FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$713,154.95 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITA | EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-1 PR/SC | RB | FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2034 | R$2,952.37 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Caxias, Machadinho, Nova Santa Rita e Salto Santiago. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | ITA | EL 500 kV ITA LT 500 kV ITA /MACHADINHO C-1 SC | RB | FT LT 500 kV ITA /MACHADINHO C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITA | EL 500 kV ITA LT 500 kV ITA /MACHADINHO C-1 SC | RB | FT LT 500 kV ITA /MACHADINHO C-1 SC | 057/2001 | IPCA | RMEL | REN 643/2014 | 5/14/2014 | 5/13/2038 | R$37,023.86 | 6/1/2025 | Ativa | Substituição dos PRs 525 kV de SiC por ZnO do circuito Machadinho Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | ITA | EL 500 kV ITA LT 500 kV ITA /MACHADINHO C-1 SC | RB | FT LT 500 kV ITA /MACHADINHO C-1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$713,154.95 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITA | EL 500 kV ITA LT 500 kV ITA /MACHADINHO C-1 SC | RB | FT LT 500 kV ITA /MACHADINHO C-1 SC | 057/2001 | IPCA | RMEL | REN 443/2011 | 5/30/2015 | 5/29/2032 | R$9,627.61 | 6/1/2025 | Ativa | Aquisição e substituição de um banco de baterias de 125 Vcc - Bat2 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019. RAP alterada no recurso contra a REH 2.407/2018. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | ITA | EL 500 kV ITA LT 500 kV ITA /MACHADINHO C-1 SC | RB | FT LT 500 kV ITA /MACHADINHO C-1 SC | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2034 | R$8,978.75 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Caxias, Machadinho, Nova Santa Rita e Salto Santiago. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | ITA | EL 500 kV ITA LT 500 kV CAXIAS NORTE /ITA C-1 RS/SC | RB | FT LT 500 kV CAXIAS NORTE /ITA C-1 RS/SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITA | EL 500 kV ITA LT 500 kV CAXIAS NORTE /ITA C-1 RS/SC | RB | FT LT 500 kV CAXIAS NORTE /ITA C-1 RS/SC | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2034 | R$ 521.29 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Caxias, Machadinho, Nova Santa Rita e Salto Santiago. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | TT 69/13,8 kV ITABAIANA TA2 SE | DIT | 061/2001 | IPCA | RCDM | REA 2837/2011 | 3/20/2016 | 10/13/2046 | R$171,305.78 | 6/1/2025 | Ativa | Instalação de 2a. unidade de Transformador de Aterramento, de impedância não superior a 20 Ohms/fase, em paralelo com o Transformador de Aterramento existente (02A1) de 20 Ohms/fase INCLUIDA NO CICLO 2016/2017 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ITABAIANA | TT 69/13,8 kV ITABAIANA TA1 SE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANA | TT 69/13,8 kV ITABAIANA TA1 SE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$248,222.69 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANA | TR 230/69 kV ITABAIANA TR3 SE | RBF | FT TR 230/69 kV ITABAIANA TR3 SE | 061/2001 | IPCA | RBNI | REA 2823/2011 | 6/22/2020 | 10/11/2054 | R$ 2,133,616.18 | 6/1/2025 | Ativa | T2009-120 | Instalar, na SE Itabaiana, um transformador trifásico 230/69 kV, de 100 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | ITABAIANA | TR 230/69 kV ITABAIANA TR2 SE | RBF | FT TR 230/69 kV ITABAIANA TR2 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANA | TR 230/69 kV ITABAIANA TR2 SE | RBF | FT TR 230/69 kV ITABAIANA TR2 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANA | TR 230/69 kV ITABAIANA TR2 SE | RBF | FT TR 230/69 kV ITABAIANA TR2 SE | 061/2001 | IPCA | RBNIA | REA 14970/2023 | R$ 2,594,829.94 | 6/1/2025 | Prevista | T2023-162 | Obra de Substituição Completa - Substituição do transformador TR2 (04T2) 230/69 kV - 100 MVA para 150 MVA (Rotina-Substituição - IdeMdl 11714). | ||||
| AXIA Energia Nordeste | ITABAIANA | TR 230/69 kV ITABAIANA TR2 SE | RBF | FT TR 230/69 kV ITABAIANA TR2 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/29/2018 | 1/6/2053 | R$15,488.42 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | TR 230/69 kV ITABAIANA TR1 SE | RBF | FT TR 230/69 kV ITABAIANA TR1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANA | TR 230/69 kV ITABAIANA TR1 SE | RBF | FT TR 230/69 kV ITABAIANA TR1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANA | TR 230/69 kV ITABAIANA TR1 SE | RBF | FT TR 230/69 kV ITABAIANA TR1 SE | 061/2001 | IPCA | RBNIA | REA 14970/2023 | R$ 2,594,829.94 | 6/1/2025 | Prevista | T2023-162 | Obra de Substituição Completa - Substituição do transformador TR1 (04T1) 230/69 kV - 100 MVA para 150 MVA (Rotina-Substituição - IdeMdl 11711). | ||||
| AXIA Energia Nordeste | ITABAIANA | TR 230/69 kV ITABAIANA TR1 SE | RBF | FT TR 230/69 kV ITABAIANA TR1 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/22/2017 | 11/29/2052 | R$14,911.01 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | MG 230 kV ITABAIANA MG1 SE | RB | FT MG 230 kV ITABAIANA MG1 SE | 061/2001 | IPCA | RBNI | REA 2823/2011 | 6/22/2020 | 2/7/2049 | R$282,313.99 | 6/1/2025 | Ativa | T2009-120 | a) Complemento, na SE Itabaiana, de infraestrutura de módulo geral pela instalação do transformador trifásico 230/69 kV, de 100 MVA, b) realocação dos dois módulos de entrada de linha 230 kV, arranjo barra principal e transferência, para os dois circuitos da LT 230kV Itabaiana - Paulo Afonso III e *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | ITABAIANA | MG 230 kV ITABAIANA MG1 SE | RB | FT MG 230 kV ITABAIANA MG1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$584,444.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANA | MG 230 kV ITABAIANA MG1 SE | RB | FT MG 230 kV ITABAIANA MG1 SE | 061/2001 | IPCA | RMEL | REN 643/2014 | 4/30/2014 | 4/29/2042 | R$59,857.31 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SISTEMAS AUTOMÁTICOS DE REGULAÇÃO ASSOCIADOS A TRANSFORMADORES Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | MG 230 kV ITABAIANA MG1 SE | RB | FT MG 230 kV ITABAIANA MG1 SE | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/6/2015 | 12/5/2032 | R$26,947.48 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição das Bateriais Saturnia 60PZS400 250Vcc, Posições 900A1 e 900A2 .Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | MG 230 kV ITABAIANA MG1 SE | RB | FT MG 230 kV ITABAIANA MG1 SE | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/24/2015 | 7/23/2030 | R$16,787.71 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SWITCH.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | MG 230 kV ITABAIANA MG1 SE | RB | FT MG 230 kV ITABAIANA MG1 SE | 061/2001 | IPCA | RBNI | REA 1814/2009 | 8/21/2015 | 8/20/2045 | R$22,080.76 | 6/1/2025 | Ativa | EL 13,8 kV para conexão de um novo alimentador INCLUIDA NO CICLO 2016/2017 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | MG 230 kV ITABAIANA MG1 SE | RB | FT MG 230 kV ITABAIANA MG1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,640,049.78 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANA | MG 230 kV ITABAIANA MG1 SE | RB | FT MG 230 kV ITABAIANA MG1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,511,925.52 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANA | MG 230 kV ITABAIANA MG1 SE | RB | FT MG 230 kV ITABAIANA MG1 SE | 061/2001 | IPCA | RMEL | REN 443/2011 | 9/15/2016 | 9/14/2033 | R$8,104.82 | 6/1/2025 | Ativa | Implantação de Banco de Baterias * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | MG 230 kV ITABAIANA MG1 SE | RB | FT MG 230 kV ITABAIANA MG1 SE | 061/2001 | IPCA | RMEL | REN 443/2011 | 1/11/2016 | 1/13/2046 | R$2,727.13 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | MG 230 kV ITABAIANA MG1 SE | RB | FT MG 230 kV ITABAIANA MG1 SE | 061/2001 | IPCA | RMEL | REN 443/2011 | 1/11/2016 | 1/13/2046 | R$2,727.13 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | MG 230 kV ITABAIANA MG1 SE | RB | FT MG 230 kV ITABAIANA MG1 SE | 061/2001 | IPCA | RBNI | REN 905/2020 | 9/18/2017 | 10/4/2045 | R$59,458.96 | 6/1/2025 | Ativa | MIM ASSOCIADO A SE Itabaiana - EL 69kV na SE Itabaiana para a SE Frei Paulo * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | MG 230 kV ITABAIANA MG1 SE | RB | FT MG 230 kV ITABAIANA MG1 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/5/2021 | 3/29/2038 | R$385,903.63 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | MG 230 kV ITABAIANA MG1 SE | RB | FT MG 230 kV ITABAIANA MG1 SE | 061/2001 | IPCA | RBNI | REA 5861/2016 | 7/27/2020 | 7/26/2048 | R$27,890.33 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE UTR Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | MG 230 kV ITABAIANA MG1 SE | RB | FT MG 230 kV ITABAIANA MG1 SE | 061/2001 | IPCA | RBNI | REN 1020/2022 | 1/22/2025 | 1/21/2056 | R$53,990.58 | 6/1/2025 | Ativa | MIM associado à instalação de um módulo de entrada de linha 69 kV, arranjo BPT, com destino à SESimão Dias na SE Itabaiana. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2025 - 2026 | |||
| AXIA Energia Nordeste | ITABAIANA | MC 69 kV TT 69/13,8 kV ITABAIANA TA2 SE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANA | MC 69 kV TT 69/13,8 kV ITABAIANA TA1 SE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANA | MC 69 kV TR 69/13,8 kV ITABAIANA TR4 SE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANA | MC 69 kV TR 230/69 kV ITABAIANA TR3 SE | RBF | FT TR 230/69 kV ITABAIANA TR3 SE | 061/2001 | IPCA | RBNI | REA 2823/2011 | 6/22/2020 | 2/1/2049 | R$595,756.54 | 6/1/2025 | Ativa | T2009-120 | Instalar, na SE Itabaiana, um módulo de conexão 69 kV, arranjo barra principal e transferência, para o transformador trifásico 230/69 kV, de 100 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | ITABAIANA | MC 69 kV TR 230/69 kV ITABAIANA TR2 SE | RBF | FT TR 230/69 kV ITABAIANA TR2 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANA | MC 69 kV TR 230/69 kV ITABAIANA TR2 SE | RBF | FT TR 230/69 kV ITABAIANA TR2 SE | 061/2001 | IPCA | RBNIA | REA 14970/2023 | R$520,105.29 | 6/1/2025 | Prevista | T2023-162 | Obra de Substituição Completa - Substituição da conexão do TR2 230/69 kV em 69 kV e arranjo BPT na SE Itabaiana (Rotina-Substituição - IdeMdl 11716). | ||||
| AXIA Energia Nordeste | ITABAIANA | MC 69 kV TR 230/69 kV ITABAIANA TR2 SE | RBF | FT TR 230/69 kV ITABAIANA TR2 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/23/2021 | 3/27/2053 | R$74,511.68 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | MC 69 kV TR 230/69 kV ITABAIANA TR1 SE | RBF | FT TR 230/69 kV ITABAIANA TR1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANA | MC 69 kV TR 230/69 kV ITABAIANA TR1 SE | RBF | FT TR 230/69 kV ITABAIANA TR1 SE | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/7/2014 | 4/15/2046 | R$30,885.61 | 6/1/2025 | Ativa | Revitalização Necessária: SUBSTITUIÇÃO DOS TC BROWN BOVERI 92T1 FASES (A,B e C). Incluído no recurso contra a REH 2.098/2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | MC 69 kV TR 230/69 kV ITABAIANA TR1 SE | RBF | FT TR 230/69 kV ITABAIANA TR1 SE | 061/2001 | IPCA | RBNIA | REA 14970/2023 | R$520,105.29 | 6/1/2025 | Prevista | T2023-162 | Obra de Substituição Completa - Substituição da conexão do TR1 230/69 kV em 69 kV e arranjo BPT na SE Itabaiana (Rotina-Substituição - IdeMdl 11713). | ||||
| AXIA Energia Nordeste | ITABAIANA | MC 230 kV TR 230/69 kV ITABAIANA TR3 SE | RBF | FT TR 230/69 kV ITABAIANA TR3 SE | 061/2001 | IPCA | RBNI | REA 2823/2011 | 6/22/2020 | 1/6/2049 | R$ 1,292,970.30 | 6/1/2025 | Ativa | T2009-120 | Instalar, na SE Itabaiana, um módulo de conexão 230 kV, arranjo barra principal e transferência, para o transformador trifásico 230/69 kV, de 100 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | ITABAIANA | MC 230 kV TR 230/69 kV ITABAIANA TR2 SE | RBF | FT TR 230/69 kV ITABAIANA TR2 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANA | MC 230 kV TR 230/69 kV ITABAIANA TR2 SE | RBF | FT TR 230/69 kV ITABAIANA TR2 SE | 061/2001 | IPCA | RMEL | REN 443/2011 | 11/24/2017 | 12/10/2050 | R$108,944.92 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE DISJUNTOR, POSIÇÃO 14T2 DA SUB ITABAIANA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | MC 230 kV TR 230/69 kV ITABAIANA TR2 SE | RBF | FT TR 230/69 kV ITABAIANA TR2 SE | 061/2001 | IPCA | RBNIA | REA 14970/2023 | R$ 1,390,430.65 | 6/1/2025 | Prevista | T2023-162 | Obra de Substituição Completa - Substituição da conexão do TR2 230/69 kV em 230 kV e arranjo BPT na SE Itabaiana (Rotina-Substituição - IdeMdl 11715). | ||||
| AXIA Energia Nordeste | ITABAIANA | MC 230 kV TR 230/69 kV ITABAIANA TR2 SE | RBF | FT TR 230/69 kV ITABAIANA TR2 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/15/2019 | 4/17/2049 | R$78,156.53 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | MC 230 kV TR 230/69 kV ITABAIANA TR1 SE | RBF | FT TR 230/69 kV ITABAIANA TR1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANA | MC 230 kV TR 230/69 kV ITABAIANA TR1 SE | RBF | FT TR 230/69 kV ITABAIANA TR1 SE | 061/2001 | IPCA | RBNIA | REA 14970/2023 | R$ 1,390,430.65 | 6/1/2025 | Prevista | T2023-162 | Obra de Substituição Completa - Substituição da conexão do TR1 230/69 kV em 230 kV e arranjo BPT na SE Itabaiana (Rotina-Substituição - IdeMdl 11712). | ||||
| AXIA Energia Nordeste | ITABAIANA | MC 230 kV TR 230/69 kV ITABAIANA TR1 SE | RBF | FT TR 230/69 kV ITABAIANA TR1 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/16/2018 | 9/15/2042 | R$22,931.89 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | IB 69 kV MG 230 kV ITABAIANA MG1 SE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANA | IB 69 kV MG 230 kV ITABAIANA MG1 SE IB1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/24/2022 | 4/23/2055 | R$71,605.13 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | ITABAIANA | IB 230 kV MG 230 kV ITABAIANA MG1 SE IB1 | RB | FT MG 230 kV ITABAIANA MG1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,837.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANA | IB 230 kV MG 230 kV ITABAIANA MG1 SE IB1 | RB | FT MG 230 kV ITABAIANA MG1 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/30/2019 | 9/29/2052 | R$ 363.88 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | EL 69 kV ITABAIANA SIMAO DIAS C1 | DIT | 061/2001 | IPCA | RCDM | REN 1020/2022 | 1/22/2025 | 1/21/2053 | R$623,392.04 | 6/1/2025 | Ativa | Instalar um módulo de entrada de linha 69kV, arranjo BPT, com destino à SE Simão Dias na SE Itabaiana. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2025 - 2026 | ||||
| AXIA Energia Nordeste | ITABAIANA | EL 69 kV ITABAIANA DIST9 | DIT | 061/2001 | IPCA | RCDM | REN 905/2020 | 9/18/2017 | 8/27/2046 | R$515,800.46 | 6/1/2025 | Ativa | SE Itabaiana - EL 69kV na SE Itabaiana para a SE Frei Paulo * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ITABAIANA | EL 69 kV ITABAIANA DIST8 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANA | EL 69 kV ITABAIANA DIST8 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANA | EL 69 kV ITABAIANA DIST8 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/10/2022 | 4/9/2046 | R$8,078.41 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | ITABAIANA | EL 69 kV ITABAIANA DIST7 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANA | EL 69 kV ITABAIANA DIST7 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANA | EL 69 kV ITABAIANA DIST6 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANA | EL 69 kV ITABAIANA DIST6 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/2/2013 | 1/5/2043 | R$25,677.38 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | ITABAIANA | EL 69 kV ITABAIANA DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANA | EL 69 kV ITABAIANA DIST5 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/10/2022 | 4/9/2046 | R$8,078.89 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | ITABAIANA | EL 69 kV ITABAIANA DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANA | EL 69 kV ITABAIANA DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANA | EL 69 kV ITABAIANA DIST4 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/22/2019 | 6/21/2043 | R$7,332.25 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | ITABAIANA | EL 69 kV ITABAIANA DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANA | EL 69 kV ITABAIANA DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANA | EL 69 kV ITABAIANA DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANA | EL 69 kV ITABAIANA DIST3 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/9/2020 | 10/8/2044 | R$7,679.03 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | ITABAIANA | EL 69 kV ITABAIANA DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANA | EL 69 kV ITABAIANA DIST2 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 1/22/2015 | 5/31/2046 | R$10,337.92 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DO TC BROWN BOVERI 92J3-2 FASE A.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ITABAIANA | EL 69 kV ITABAIANA DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANA | EL 69 kV ITABAIANA DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANA | EL 69 kV ITABAIANA DIST2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/21/2022 | 4/20/2046 | R$8,086.42 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | ITABAIANA | EL 69 kV ITABAIANA DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANA | EL 69 kV ITABAIANA DIST1 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 2/9/2014 | 6/18/2045 | R$20,033.64 | 6/1/2025 | Ativa | Revitalização Necessária: SUBSTITUIÇÃO DOS TC BROWN BOVERI 92J1-2 FASES (A e C).Incluído no recurso contra a REH 2.098/2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ITABAIANA | EL 230 kV ITABAIANA LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE | RB | FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANA | EL 230 kV ITABAIANA LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE | RB | FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE | 061/2001 | IPCA | RMEL | REN 443/2011 | 8/20/2017 | 8/19/2045 | R$14,435.98 | 6/1/2025 | Ativa | SUBSTITUIÇÃO 01 RELÉ DE PROTEÇÃO THR DA LT 04S7 ITABAIANA/ PAULO AFONSO C2 230KV. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | EL 230 kV ITABAIANA LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE | RB | FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE | 061/2001 | IPCA | RBNI | REA 2823/2011 | 6/22/2020 | 12/8/2046 | R$335,223.35 | 6/1/2025 | Ativa | c) adequação da proteção de um módulo de entrada de linha 230 kV, arranjo barra principal e transferência, para um circuito da LT 230kV Itabaiana - Paulo Afonso III. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | EL 230 kV ITABAIANA LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE | RB | FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/30/2021 | 7/13/2047 | R$44,051.70 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | EL 230 kV ITABAIANA LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE | RB | FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANA | EL 230 kV ITABAIANA LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE | RB | FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE | 061/2001 | IPCA | RBNI | REA 2823/2011 | 6/22/2020 | 6/21/2051 | R$ 1,258,987.02 | 6/1/2025 | Ativa | b) realocação dos dois módulos de entrada de linha 230 kV, arranjo barra principal e transferência, para os dois circuitos da LT 230kV Itabaiana - Paulo Afonso III. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | EL 230 kV ITABAIANA LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE | RB | FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2021 | 8/26/2036 | R$105,055.95 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-2 SE | RB | FT LT 230 kV ITABAIANA /JARDIM C-2 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANA | EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-2 SE | RB | FT LT 230 kV ITABAIANA /JARDIM C-2 SE | 061/2001 | IPCA | RBNI | REA 5861/2016 | 6/10/2016 | 6/9/2044 | R$21,851.09 | 6/1/2025 | Ativa | EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-2 SE * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-2 SE | RB | FT LT 230 kV ITABAIANA /JARDIM C-2 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/5/2022 | 5/25/2039 | R$87,259.90 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-1 SE | RB | FT LT 230 kV ITABAIANA /JARDIM C-1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANA | EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-1 SE | RB | FT LT 230 kV ITABAIANA /JARDIM C-1 SE | 061/2001 | IPCA | RMEL | REN 643/2014 | 4/21/2014 | 7/9/2045 | R$16,209.83 | 6/1/2025 | Ativa | Revitalização Necessária: SUBSTITUIÇÃO DO TPC HAEFELY-ER 84C1 FASE B. Incluído no recurso contra a REH 2.098/2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-1 SE | RB | FT LT 230 kV ITABAIANA /JARDIM C-1 SE | 061/2001 | IPCA | RBNI | REA 5861/2016 | 6/10/2016 | 6/9/2044 | R$21,851.09 | 6/1/2025 | Ativa | EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-1 SE * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-1 SE | RB | FT LT 230 kV ITABAIANA /JARDIM C-1 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/1/2021 | 1/30/2047 | R$263,545.15 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | EL 230 kV ITABAIANA LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE | RB | FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANA | EL 230 kV ITABAIANA LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE | RB | FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE | 061/2001 | IPCA | RBNI | REA 5861/2016 | 6/10/2016 | 6/9/2044 | R$21,851.09 | 6/1/2025 | Ativa | EL 230 kV ITABAIANA LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANA | EL 230 kV ITABAIANA LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE | RB | FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/7/2021 | 4/11/2047 | R$395,487.04 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANINHA | TT 69/13,8 kV ITABAIANINHA TA1 SE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANINHA | TT 69/13,8 kV ITABAIANINHA TA1 SE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$248,222.69 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANINHA | TT 69/13,8 kV ITABAIANINHA TA1 SE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$228,831.00 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANINHA | TR 69/13,8 kV ITABAIANINHA TR5 SE | RB | FT MG 230 kV ITABAIANINHA MG1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANINHA | TR 69/13,8 kV ITABAIANINHA TR5 SE | RB | FT MG 230 kV ITABAIANINHA MG1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$76,466.27 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANINHA | TR 69/13,8 kV ITABAIANINHA TR5 SE | RB | FT MG 230 kV ITABAIANINHA MG1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$70,492.55 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANINHA | TR 230/69 kV ITABAIANINHA TR3 SE | RBF | FT TR 230/69 kV ITABAIANINHA TR3 SE | 061/2001 | IPCA | RBNI | REA 4271/2013 | 8/10/2015 | 4/17/2050 | R$ 1,305,007.00 | 6/1/2025 | Ativa | T2012-107 | Instalação do 3º transformador trifásico (TR-3) 230/69 kV, de 100 MVA.(Receita alterada em razão de mudança de perfil da RAP). *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | ITABAIANINHA | TR 230/69 kV ITABAIANINHA TR2 SE | RBF | FT TR 230/69 kV ITABAIANINHA TR2 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$209,167.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANINHA | TR 230/69 kV ITABAIANINHA TR2 SE | RBF | FT TR 230/69 kV ITABAIANINHA TR2 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/4/2015 | 11/11/2050 | R$149,043.88 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANINHA | TR 230/69 kV ITABAIANINHA TR1 SE | RBF | FT TR 230/69 kV ITABAIANINHA TR1 SE | 061/2001 | IPCA | RBNI | REA 4423/2013 | 9/12/2016 | 4/7/2051 | R$ 1,476,757.63 | 6/1/2025 | Ativa | T2013-067 | Obra de Substituição Completa - Substituição, na SE Itabaianinha, do 1º transformador trifásico (TR-1) 230/69 kV, de 33 MVA, por outro de 100 MVA *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | ITABAIANINHA | MG 230 kV ITABAIANINHA MG1 SE | RB | FT MG 230 kV ITABAIANINHA MG1 SE | 061/2001 | IPCA | RBNI | REA 4271/2013 | 8/10/2015 | 2/1/2046 | R$184,273.60 | 6/1/2025 | Ativa | T2012-107 | Complementação de infraestrutura de módulo geral, referente aos módulos de infraestrutura de manobra 230 kV e 69 kV associados à instalação do TR-3 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | ITABAIANINHA | MG 230 kV ITABAIANINHA MG1 SE | RB | FT MG 230 kV ITABAIANINHA MG1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$464,332.86 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANINHA | MG 230 kV ITABAIANINHA MG1 SE | RB | FT MG 230 kV ITABAIANINHA MG1 SE | 061/2001 | IPCA | RBNI | REA 5212/2015 | 12/3/2017 | 5/27/2048 | R$193,747.82 | 6/1/2025 | Ativa | T2015-029 | Complementação do módulo de infraestrutura para o 1° Banco de Capacitores 230 kV, 50 MVAr na Subestação Itabaianinha. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | ITABAIANINHA | MG 230 kV ITABAIANINHA MG1 SE | RB | FT MG 230 kV ITABAIANINHA MG1 SE | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/30/2013 | 9/29/2030 | R$4,375.13 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCOS DE BATERIAS -48Vcc. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANINHA | MG 230 kV ITABAIANINHA MG1 SE | RB | FT MG 230 kV ITABAIANINHA MG1 SE | 061/2001 | IPCA | RBNI | REA 2376/2010 | 3/22/2015 | 3/21/2045 | R$53,241.36 | 6/1/2025 | Ativa | Complementação do Módulo geral da Subestaçaão Itabaianinha com um módulo de infraestrutura de manobra referente a EL 69kV para a LT Itabaianinha (Chesf) - Itabaianinha (Sulgipe) C2.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANINHA | MG 230 kV ITABAIANINHA MG1 SE | RB | FT MG 230 kV ITABAIANINHA MG1 SE | 061/2001 | IPCA | RBNI | REA 2837/2011 | 3/6/2015 | 3/5/2045 | R$22,416.56 | 6/1/2025 | Ativa | Complementação do Módulo geral da Subestação Itabaianinha com um módulo de infraestrutura de manobra referente a EL 69kV para Arauá.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANINHA | MG 230 kV ITABAIANINHA MG1 SE | RB | FT MG 230 kV ITABAIANINHA MG1 SE | 061/2001 | IPCA | RMEL | REN 643/2014 | 2/7/2014 | 2/6/2029 | R$62,242.64 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE AMPLIFICADORES ÓPTICOS EM FINAL DE VIDA ÚTIL Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANINHA | MG 230 kV ITABAIANINHA MG1 SE | RB | FT MG 230 kV ITABAIANINHA MG1 SE | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/5/2015 | 12/4/2032 | R$17,490.82 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição Baterias NIFE 87M50 125Vcc, Posições 800A1 e 800A2 .Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANINHA | MG 230 kV ITABAIANINHA MG1 SE | RB | FT MG 230 kV ITABAIANINHA MG1 SE | 061/2001 | IPCA | RMEL | REN 643/2014 | 8/31/2015 | 8/30/2043 | R$62,880.25 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SISTEMAS AUTOMÁTICOS DE REGULAÇÃO ASSOCIADOS A TRANSFORMADORES..Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANINHA | MG 230 kV ITABAIANINHA MG1 SE | RB | FT MG 230 kV ITABAIANINHA MG1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,302,996.48 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANINHA | MG 230 kV ITABAIANINHA MG1 SE | RB | FT MG 230 kV ITABAIANINHA MG1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,201,203.55 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANINHA | MG 230 kV ITABAIANINHA MG1 SE | RB | FT MG 230 kV ITABAIANINHA MG1 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/8/2021 | 11/13/2039 | R$295,887.15 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANINHA | MG 230 kV ITABAIANINHA MG1 SE | RB | FT MG 230 kV ITABAIANINHA MG1 SE | 061/2001 | IPCA | RBNI | DSP 386/2021 | 6/30/2019 | 6/29/2034 | R$12,440.26 | 6/1/2025 | Ativa | Instalação de UTR (composto por uma Unidade Remota de Comandos, GPS e cabos de controle) em substituição à existente. Reconfiguração em bases da UTR, SAGE e relés auxiliares e adequações na fiação e cabeação dos painéis de proteção e controle. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANINHA | MG 230 kV ITABAIANINHA MG1 SE | RB | FT MG 230 kV ITABAIANINHA MG1 SE | 061/2001 | IPCA | RBNI | REN 1020/2022 | 2/4/2025 | 2/3/2056 | R$54,022.41 | 6/1/2025 | Ativa | MIM associado à instalação de um módulo de entrada de linha69 kV, arranjo BPT, com destino à SE orge Prado Leite na SE Itabaianinha. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2025 - 2026 | |||
| AXIA Energia Nordeste | ITABAIANINHA | MC 69 kV TT 69/13,8 kV ITABAIANINHA TA1 SE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANINHA | MC 69 kV TR 69/13,8 kV ITABAIANINHA TR5 SE | RB | FT MG 230 kV ITABAIANINHA MG1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANINHA | MC 69 kV TR 69/13,8 kV ITABAIANINHA TR5 SE | RB | FT MG 230 kV ITABAIANINHA MG1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANINHA | MC 69 kV TR 69/13,8 kV ITABAIANINHA TR5 SE | RB | FT MG 230 kV ITABAIANINHA MG1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$162,185.50 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANINHA | MC 69 kV TR 230/69 kV ITABAIANINHA TR3 SE | RBF | FT TR 230/69 kV ITABAIANINHA TR3 SE | 061/2001 | IPCA | RBNI | REA 4271/2013 | 8/10/2015 | 10/18/2047 | R$363,813.38 | 6/1/2025 | Ativa | T2012-107 | Instalação de um módulo de CT 69 kV para o TR-3 230/69 kV, arranjo barra principal e transferência, com inclusão de três TPCs 69 kV.(Receita alterada em razão de mudança de perfil de RAP) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | ITABAIANINHA | MC 69 kV TR 230/69 kV ITABAIANINHA TR2 SE | RBF | FT TR 230/69 kV ITABAIANINHA TR2 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANINHA | MC 69 kV TR 230/69 kV ITABAIANINHA TR1 SE | RBF | FT TR 230/69 kV ITABAIANINHA TR1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANINHA | MC 69 kV TR 230/69 kV ITABAIANINHA TR1 SE | RBF | FT TR 230/69 kV ITABAIANINHA TR1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANINHA | MC 69 kV TR 230/69 kV ITABAIANINHA TR1 SE | RBF | FT TR 230/69 kV ITABAIANINHA TR1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$162,185.50 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANINHA | MC 230 kV TR 230/69 kV ITABAIANINHA TR3 SE | RBF | FT TR 230/69 kV ITABAIANINHA TR3 SE | 061/2001 | IPCA | RBNI | REA 4271/2013 | 8/10/2015 | 12/5/2047 | R$943,644.81 | 6/1/2025 | Ativa | T2012-107 | Instalação de um módulo de CT 230 kV para o TR-3 230/69 kV, arranjo barra principal e transferência.(Receita alterada em razão de mudança de perfil de RAP) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | ITABAIANINHA | MC 230 kV TR 230/69 kV ITABAIANINHA TR2 SE | RBF | FT TR 230/69 kV ITABAIANINHA TR2 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANINHA | MC 230 kV TR 230/69 kV ITABAIANINHA TR2 SE | RBF | FT TR 230/69 kV ITABAIANINHA TR2 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/17/2020 | 7/12/2048 | R$54,062.12 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANINHA | MC 230 kV TR 230/69 kV ITABAIANINHA TR1 SE | RBF | FT TR 230/69 kV ITABAIANINHA TR1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANINHA | MC 230 kV TR 230/69 kV ITABAIANINHA TR1 SE | RBF | FT TR 230/69 kV ITABAIANINHA TR1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$410,719.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANINHA | MC 230 kV TR 230/69 kV ITABAIANINHA TR1 SE | RBF | FT TR 230/69 kV ITABAIANINHA TR1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$378,633.35 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANINHA | MC 230 kV TR 230/69 kV ITABAIANINHA TR1 SE | RBF | FT TR 230/69 kV ITABAIANINHA TR1 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2021 | 12/31/2048 | R$5,109.04 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANINHA | MC 230 kV BC 230 kV 50 Mvar ITABAIANINHA BC1 SE | RB | FT BC 230 kV 50 Mvar ITABAIANINHA BC1 SE | 061/2001 | IPCA | RBNI | REA 5212/2015 | 12/3/2017 | 3/18/2050 | R$ 1,057,881.37 | 6/1/2025 | Ativa | T2015-029 | Instalação da Conexão do 1° Banco de Capacitores 230 kV, 50 MVAr, na Subestação Itabaianinha. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | ITABAIANINHA | IB 69 kV MG 230 kV ITABAIANINHA MG1 SE IB1 | DIT | 061/2001 | IPCA | RCDM | REA 2460/2010 | 11/2/2012 | 11/18/2045 | R$236,715.53 | 6/1/2025 | Ativa | T2009-066 | Instalação de um módulo de manobra de interligação de barramentos em 69 kV, arranjo barra principal e transferência - BPT. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANINHA | IB 230 kV MG 230 kV ITABAIANINHA MG1 SE IB1 | RB | FT MG 230 kV ITABAIANINHA MG1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,837.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANINHA | IB 230 kV MG 230 kV ITABAIANINHA MG1 SE IB1 | RB | FT MG 230 kV ITABAIANINHA MG1 SE | 061/2001 | IPCA | RBNI | REA 5212/2015 | 12/3/2017 | 12/2/2050 | R$96,835.25 | 6/1/2025 | Ativa | T2015-029 | Substituição do disjuntor da interligação de barra do setor de 230 kV da SE Itabaianinha em virtude da instalação do 1° banco de capacitores. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | ITABAIANINHA | EL 69 kV ITABAIANINHA JORGE PRADO LEI | DIT | 061/2001 | IPCA | RCDM | REN 1020/2022 | 2/4/2025 | 2/3/2053 | R$623,791.60 | 6/1/2025 | Ativa | Instalar um módulo de entrada de linha 69 kV, arranjo BPT, com destino à SE Jorge Prado Leite na SE Itabaianinha. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2025 - 2026 | ||||
| AXIA Energia Nordeste | ITABAIANINHA | EL 69 kV ITABAIANINHA ITAB. 04M4 | DIT | 061/2001 | IPCA | RCDM | REA 2376/2010 | 3/22/2015 | 7/6/2047 | R$387,901.91 | 6/1/2025 | Ativa | Instalação de 1 (uma) EL 69kV para a LT Itabaianinha (Chesf) - Itabaianinha (Sulgipe) C2.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ITABAIANINHA | EL 69 kV ITABAIANINHA DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANINHA | EL 69 kV ITABAIANINHA DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANINHA | EL 69 kV ITABAIANINHA DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANINHA | EL 69 kV ITABAIANINHA DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITABAIANINHA | EL 69 kV ITABAIANINHA ARAUA 04M2 | DIT | 061/2001 | IPCA | RCDM | REA 2837/2011 | 3/6/2015 | 4/30/2047 | R$410,532.87 | 6/1/2025 | Ativa | Instalar um módulo de entrada de linha de 69 kV para Arauá.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | ITABAIANINHA | EL 230 kV ITABAIANINHA LT 230 kV ITABAIANINHA /CATU C-1 SE/BA | RB | FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANINHA | EL 230 kV ITABAIANINHA LT 230 kV ITABAIANINHA /CATU C-1 SE/BA | RB | FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$596,907.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANINHA | EL 230 kV ITABAIANINHA LT 230 kV ITABAIANINHA /CATU C-1 SE/BA | RB | FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$550,275.38 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANINHA | EL 230 kV ITABAIANINHA LT 230 kV ITABAIANINHA /CATU C-1 SE/BA | RB | FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/11/2021 | 3/29/2042 | R$169,914.13 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANINHA | EL 230 kV ITABAIANINHA LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE | RB | FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITABAIANINHA | EL 230 kV ITABAIANINHA LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE | RB | FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE | 061/2001 | IPCA | RBNI | REA 5861/2016 | 6/10/2016 | 6/9/2044 | R$21,851.09 | 6/1/2025 | Ativa | EL 230 kV ITABAIANINHA LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANINHA | EL 230 kV ITABAIANINHA LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE | RB | FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/18/2022 | 9/17/2037 | R$73,861.73 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ITABAIANINHA | BC 230 kV 50 Mvar ITABAIANINHA BC1 SE | RB | FT BC 230 kV 50 Mvar ITABAIANINHA BC1 SE | 061/2001 | IPCA | RBNI | REA 5212/2015 | 12/3/2017 | 2/6/2041 | R$325,250.78 | 6/1/2025 | Ativa | T2015-029 | Instalação do 1° Banco de Capacitores Shunt 230 kV, 50 MVAr, na Subestação Itabaianinha. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | ITABERA | RTL 750 kV 330 Mvar ITABERA RIV2 SP | RB | FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$994,138.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | RTL 750 kV 330 Mvar ITABERA RIV2 SP | RB | FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,814,883.14 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | RTL 750 kV 330 Mvar ITABERA RIV2 SP | RB | FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | 062/2001 | IPCA | RMEL | REA 11449/2022 | 5/20/2022 | 4/29/2058 | R$643,638.31 | 6/1/2025 | Ativa | T2022-016 | Obra de Substituição Parcial - Substituir na SE Itaberá a fase A do reator monofásico - RIV2 - 750 kV - 1x110 MVAr por outra fase C de 1x110 MVAr. Parcela de RAP referente à troca da fase C do reator RIV2. Parcela de RAP referente à troca da fase C. Não excluir a receita de O&M antiga até a entrada das três fases do equipamento. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | ITABERA | RTL 750 kV 329 Mvar ITABERA RIV3 SP | RB | FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$994,138.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | RTL 750 kV 329 Mvar ITABERA RIV3 SP | RB | FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,814,883.14 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | RTL 750 kV 329 Mvar ITABERA RIV1 SP | RB | FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$994,138.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | RTL 750 kV 329 Mvar ITABERA RIV1 SP | RB | FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,814,883.14 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | RTL 750 kV 329 Mvar ITABERA RIV1 SP | RB | FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | 062/2001 | IPCA | RMELP | DSP 1108/2024 | R$ 4,254,780.09 | 6/1/2025 | Prevista | T2024-095 | Obra de Substituição Completa: Substituição das fases A, B e C do reator RTIAIV1 765 kV 109,67 Mvar, na SE Itaberá. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia | ITABERA | RTB 765 kV 330 Mvar ITABERA RT3 SP | RB | FT RTB 765 kV 330 Mvar ITABERA RT3 SP | 062/2001 | IPCA | RBNI | REA 10196/2021 | 5/29/2025 | 5/28/2061 | R$ 3,286,416.36 | 6/1/2025 | Ativa | T2021-046 | Instalar, na SE ITABERA, um banco de reatores de barra monofásicos RT3 765 kV - 330 Mvar. | ||
| AXIA Energia | ITABERA | RTB 765 kV 330 Mvar ITABERA RT2 SP | RB | FT RTB 765 kV 330 Mvar ITABERA RT2 SP | 062/2001 | IPCA | RBNI | REA 5822/2016 | 8/1/2019 | 3/25/2054 | R$ 3,907,865.22 | 6/1/2025 | Ativa | T2016-029 | Instalação na SE Itaberá de um banco de reatores de barra 765 kV, (3+1)x110 Mvar *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | ITABERA | RTB 750 kV 329 Mvar ITABERA RT1 SP | RB | FT RTB 750 kV 329 Mvar ITABERA RT1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$994,138.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | RTB 750 kV 329 Mvar ITABERA RT1 SP | RB | FT RTB 750 kV 329 Mvar ITABERA RT1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,814,883.14 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | RTB 750 kV 329 Mvar ITABERA RT1 SP | RB | FT RTB 750 kV 329 Mvar ITABERA RT1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 4,089,758.95 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | RTB 750 kV 329 Mvar ITABERA RT1 SP | RB | FT RTB 750 kV 329 Mvar ITABERA RT1 SP | 062/2001 | IPCA | RMELP | REA 11449/2022 | R$ 2,435,280.61 | 6/1/2025 | Prevista | T2022-064 | Obra de Substituição Parcial - Substituição das fases A e B do banco de reatores RT1. Parcela de RAP referente à troca das fases A e B. Não excluir a receita de O&M antiga até a entrada das três fases do equipamento. | ||||
| AXIA Energia | ITABERA | RTB 750 kV 110 Mvar ITABERA RTR2 SP | RB | FT RTB 750 kV 110 Mvar ITABERA RTR2 SP | 062/2001 | IPCA | RBNI | REA 5822/2016 | 8/1/2019 | 10/3/2053 | R$ 1,294,914.30 | 6/1/2025 | Ativa | T2016-029 | Instalação na SE Itaberá de banco de reatores de barra reserva 765 kV, 1 x 110 Mvar. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | ITABERA | RTB 750 kV 110 Mvar ITABERA RTR1 SP | RB | FT RTB 750 kV 110 Mvar ITABERA RTR1 SP | 062/2001 | IPCA | RBNI | REA 10196/2021 | 5/29/2025 | 5/28/2061 | R$ 1,095,472.12 | 6/1/2025 | Ativa | T2021-046 | Instalar, na SE ITABERA, um reator de barra monofásico reserva RTR1 765 kV - 110 Mvar. | ||
| AXIA Energia | ITABERA | MG 750 kV ITABERA MG1 SP | RB | FT MG 750 kV ITABERA MG1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,207,076.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | MG 750 kV ITABERA MG1 SP | RB | FT MG 750 kV ITABERA MG1 SP | 062/2001 | IPCA | RBNI | REA 5822/2016 | 8/1/2019 | 1/24/2049 | R$634,204.12 | 6/1/2025 | Ativa | T2016-029 | Adequação do módulo geral da SE Itaberá para instalação do sistema de telecomunicações para o reforço do segundo reator de barra 765 kV *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | ITABERA | MG 750 kV ITABERA MG1 SP | RB | FT MG 750 kV ITABERA MG1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,632,006.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | MG 750 kV ITABERA MG1 SP | RB | FT MG 750 kV ITABERA MG1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 4,965,759.22 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | MG 750 kV ITABERA MG1 SP | RB | FT MG 750 kV ITABERA MG1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 6/20/2016 | 2/14/2030 | R$17,672.25 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (005732/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITABERA | MG 750 kV ITABERA MG1 SP | RB | FT MG 750 kV ITABERA MG1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 6/20/2016 | 2/14/2030 | R$6,660.56 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (004256/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITABERA | MG 750 kV ITABERA MG1 SP | RB | FT MG 750 kV ITABERA MG1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 6/20/2016 | 2/14/2030 | R$6,660.56 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (004261/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITABERA | MG 750 kV ITABERA MG1 SP | RB | FT MG 750 kV ITABERA MG1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 6/20/2016 | 2/14/2030 | R$6,660.56 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (004262/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITABERA | MG 750 kV ITABERA MG1 SP | RB | FT MG 750 kV ITABERA MG1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 6/20/2016 | 2/14/2030 | R$6,660.56 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (004267/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITABERA | MG 750 kV ITABERA MG1 SP | RB | FT MG 750 kV ITABERA MG1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 6/20/2016 | 2/14/2030 | R$8,847.94 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (004273/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITABERA | MG 750 kV ITABERA MG1 SP | RB | FT MG 750 kV ITABERA MG1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 6/20/2016 | 2/14/2030 | R$8,824.32 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (004277/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITABERA | MG 750 kV ITABERA MG1 SP | RB | FT MG 750 kV ITABERA MG1 SP | 062/2001 | IPCA | RBNI | REA 10196/2021 | 5/29/2025 | 5/28/2056 | R$642,496.53 | 6/1/2025 | Ativa | T2021-046 | Complementação do Módulo Geral para instalação do 3° banco de reatores de barra 765 kV, (3+1)x110MVAr, na SE Itaberá. | ||
| AXIA Energia | ITABERA | MG 750 kV ITABERA MG1 SP | RB | FT MG 750 kV ITABERA MG1 SP | 062/2001 | IPCA | RBNI | REA 8314/2019 | 7/9/2019 | 7/8/2034 | R$11,461.92 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000377/2014. (LT 765 kV ITABERA / IVAIPORA FUR C 1 SP/PR) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITABERA | MG 750 kV ITABERA MG1 SP | RB | FT MG 750 kV ITABERA MG1 SP | 062/2001 | IPCA | RBNI | REA 8314/2019 | 7/9/2019 | 7/8/2034 | R$11,461.92 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000365/2014. (FT: LT 765 kV ITABERA / IVAIPORA FUR C 2 SP/PR) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITABERA | MG 750 kV ITABERA MG1 SP | RB | FT MG 750 kV ITABERA MG1 SP | 062/2001 | IPCA | RBNI | REA 8314/2019 | 7/9/2019 | 7/8/2034 | R$11,461.92 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000426/2014. (FT: LT 765 kV ITABERA / IVAIPORA FUR C 3 SP/PR) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITABERA | MG 750 kV ITABERA MG1 SP | RB | FT MG 750 kV ITABERA MG1 SP | 062/2001 | IPCA | RBNI | REA 8314/2019 | 7/9/2019 | 7/8/2034 | R$11,461.92 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000425/2014. (FT: LT 765 kV ITABERA / TIJUCO PRETO C 1 SP) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITABERA | MG 750 kV ITABERA MG1 SP | RB | FT MG 750 kV ITABERA MG1 SP | 062/2001 | IPCA | RBNI | REA 8314/2019 | 7/9/2019 | 7/8/2034 | R$10,787.69 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000398/2014. (FT: LT 765 kV ITABERA / TIJUCO PRETO C 2 SP) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITABERA | MG 750 kV ITABERA MG1 SP | RB | FT MG 750 kV ITABERA MG1 SP | 062/2001 | IPCA | RBNI | REA 8314/2019 | 7/9/2019 | 7/8/2034 | R$10,787.69 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000385/2014. (FT: LT 765 kV ITABERA / TIJUCO PRETO C 3 SP) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITABERA | MG 750 kV ITABERA MG1 SP | RB | FT MG 750 kV ITABERA MG1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 9/3/2015 | 5/3/2042 | R$ 1,511,061.18 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITABERA | MC 765 kV RTB 765 kV 330 Mvar ITABERA RT3 SP | RB | FT RTB 765 kV 330 Mvar ITABERA RT3 SP | 062/2001 | IPCA | RBNI | REA 10196/2021 | 5/29/2025 | 5/28/2055 | R$ 2,418,151.00 | 6/1/2025 | Ativa | T2021-046 | Instalar, na SE ITABERA, um módulo de conexão com disjuntor, em 765kV,para o reator de barra RT3 765kV - 330 Mvar. | ||
| AXIA Energia | ITABERA | MC 765 kV RTB 765 kV 330 Mvar ITABERA RT2 SP | RB | FT RTB 765 kV 330 Mvar ITABERA RT2 SP | 062/2001 | IPCA | RBNI | REA 5822/2016 | 8/1/2019 | 11/4/2049 | R$ 2,877,906.19 | 6/1/2025 | Ativa | T2016-029 | Instalação na SE Itaberá de conexão para o banco de reatores RT2, 765 kV, DJM. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | ITABERA | MC 750 kV RTL 750 kV 330 Mvar ITABERA RIV2 SP | RB | FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,673.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | MC 750 kV RTL 750 kV 329 Mvar ITABERA RIV3 SP | RB | FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,673.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | MC 750 kV RTL 750 kV 329 Mvar ITABERA RIV1 SP | RB | FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,673.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | MC 750 kV RTB 750 kV 329 Mvar ITABERA RT1 SP | RB | FT RTB 750 kV 329 Mvar ITABERA RT1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$613,762.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | MC 750 kV RTB 750 kV 329 Mvar ITABERA RT1 SP | RB | FT RTB 750 kV 329 Mvar ITABERA RT1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/29/2018 | 11/28/2033 | R$181,109.78 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITABERA | MC 750 kV CR 750 kV 621 Mvar ITABERA BC3B SP | RB | FT CR 750 kV 621 Mvar ITABERA BC3B SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,400.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | MC 750 kV CR 750 kV 621 Mvar ITABERA BC3A SP | RB | FT CR 750 kV 621 Mvar ITABERA BC3A SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,400.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | MC 750 kV CR 750 kV 621 Mvar ITABERA BC2B SP | RB | FT CR 750 kV 621 Mvar ITABERA BC2B SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,400.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | MC 750 kV CR 750 kV 621 Mvar ITABERA BC2A SP | RB | FT CR 750 kV 621 Mvar ITABERA BC2A SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,400.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | MC 750 kV CR 750 kV 621 Mvar ITABERA BC1B SP | RB | FT CR 750 kV 621 Mvar ITABERA BC1B SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,400.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | MC 750 kV CR 750 kV 621 Mvar ITABERA BC1A SP | RB | FT CR 750 kV 621 Mvar ITABERA BC1A SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,400.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | IB 765 kV MG 750 kV ITABERA MG1 SP IB1 | RB | FT MG 750 kV ITABERA MG1 SP | 062/2001 | IPCA | RBNI | REA 10196/2021 | 5/29/2025 | 5/28/2057 | R$ 3,077,468.36 | 6/1/2025 | Ativa | T2021-046 | Instalar, na SE ITABERA, uma interligação de barramentos IB1, em 765 kV, arranjo Disjuntor e Meio. | ||
| AXIA Energia | ITABERA | IB 750 kV MG 750 kV ITABERA MG1 SP IB4 | RB | FT MG 750 kV ITABERA MG1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$748,462.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | IB 750 kV MG 750 kV ITABERA MG1 SP IB3 | RB | FT MG 750 kV ITABERA MG1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$748,462.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | IB 750 kV MG 750 kV ITABERA MG1 SP IB3 | RB | FT MG 750 kV ITABERA MG1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 2/17/2019 | 3/24/2049 | R$68,926.47 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITABERA | IB 750 kV MG 750 kV ITABERA MG1 SP IB2 | RB | FT MG 750 kV ITABERA MG1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$748,462.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | IB 750 kV MG 750 kV ITABERA MG1 SP IB2 | RB | FT MG 750 kV ITABERA MG1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/23/2019 | 1/22/2052 | R$301,529.60 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITABERA | IB 750 kV MG 750 kV ITABERA MG1 SP IB1 | RB | FT MG 750 kV ITABERA MG1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$748,462.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-3 SP | RB | FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$707,119.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-3 SP | RB | FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP | 062/2001 | IPCA | RBNI | REA 5861/2016 | 12/7/2017 | 12/6/2032 | R$34,005.18 | 6/1/2025 | Ativa | Substituição da teleproteção da LT Itaberá - Tijuco Preto circuito 3 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 – 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-3 SP | RB | FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP | 062/2001 | IPCA | RBNI | REA 5861/2016 | 7/9/2019 | 7/8/2034 | R$17,780.87 | 6/1/2025 | Ativa | LT 765kV Itaberá - Tijuco Preto C3 - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-3 SP | RB | FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/19/2018 | 11/18/2033 | R$81,165.06 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-3 SP | RB | FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP | 062/2001 | IPCA | RBNI | DSP 1107/2021 | 10/31/2016 | 11/3/2046 | R$37,671.26 | 6/1/2025 | Ativa | S-STIA -1 TPC NS 12.6219-04. Regularização de extrapatrimonial nos termos do Despacho nº 1.107/2021 Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-3 SP | RB | FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP | 062/2001 | IPCA | RBNI | DSP 1107/2021 | 10/31/2016 | 11/3/2046 | R$37,671.26 | 6/1/2025 | Ativa | S-STIA -1 TPC NS 12.6218-05. Regularização de extrapatrimonial nos termos do Despacho nº 1.107/2021 Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-2 SP | RB | FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$707,119.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-2 SP | RB | FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP | 062/2001 | IPCA | RBNI | REA 5861/2016 | 7/9/2019 | 7/8/2034 | R$10,151.54 | 6/1/2025 | Ativa | LT 765kV Itaberá - Tijuco Preto C2 - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-2 SP | RB | FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/10/2019 | 1/9/2047 | R$551,916.17 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-1 SP | RB | FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$707,119.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-1 SP | RB | FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,713,485.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-1 SP | RB | FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP | 062/2001 | IPCA | RBNI | REA 5861/2016 | 7/9/2019 | 7/8/2034 | R$10,151.54 | 6/1/2025 | Ativa | LT 765kV Itaberá - Tijuco Preto C1 - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-1 SP | RB | FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/7/2019 | 9/20/2042 | R$272,598.33 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$707,119.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | 062/2001 | IPCA | RBNI | REA 5861/2016 | 4/18/2018 | 4/17/2033 | R$16,501.92 | 6/1/2025 | Ativa | Substituição da teleproteção da LT Ivaiporã - Itaberá circuito 3 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 – 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | 062/2001 | IPCA | RBNI | REA 5861/2016 | 7/9/2019 | 7/8/2034 | R$10,151.54 | 6/1/2025 | Ativa | LT 765kV Ivaiporã - Itaberá C3 - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/4/2018 | 6/18/2038 | R$147,715.60 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | 062/2001 | IPCA | RBNI | DSP 1107/2021 | 11/30/2016 | 12/3/2046 | R$37,771.01 | 6/1/2025 | Ativa | S-STIA - INSTALAÇÃO 1 DCP (NS 12617-06). Regularização de extrapatrimonial nos termos do Despacho nº 1.107/2021 Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | 062/2001 | IPCA | RBNI | DSP 1107/2021 | 11/30/2016 | 12/3/2046 | R$37,771.01 | 6/1/2025 | Ativa | S-STIA - INSTALAÇAO 1 DCP (NS 12619-02). Regularização de extrapatrimonial nos termos do Despacho nº 1.107/2021 Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$707,119.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,713,485.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | 062/2001 | IPCA | RBNI | REA 5861/2016 | 7/9/2019 | 7/8/2034 | R$10,151.54 | 6/1/2025 | Ativa | LT 765kV Ivaiporã - Itaberá C2 - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 2/27/2018 | 10/28/2039 | R$195,696.89 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$707,119.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,713,485.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | 062/2001 | IPCA | RBNI | REA 5861/2016 | 7/9/2019 | 7/8/2034 | R$10,151.54 | 6/1/2025 | Ativa | LT 765kV Ivaiporã - Itaberá C1 - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITABERA | EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/19/2018 | 11/18/2033 | R$81,165.06 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITABERA | CR 750 kV 621 Mvar ITABERA BC3B SP | RB | FT CR 750 kV 621 Mvar ITABERA BC3B SP | 062/2001 | IPCA | RMEL | REA 11449/2022 | 2/14/2025 | 2/13/2045 | R$ 13,152,098.39 | 6/1/2025 | Ativa | T2022-063 | Obra de Substituição Completa - Substituição completa do banco de capacitores série BSIATP3 de 1242 Mvar, localizado na saída de linha da LT 765kV Itaberá - Tijuco Preto C3, por outro de características similares. | ||
| AXIA Energia | ITABERA | CR 750 kV 621 Mvar ITABERA BC3A SP | RB | FT CR 750 kV 621 Mvar ITABERA BC3A SP | 062/2001 | IPCA | RMEL | REA 11449/2022 | 2/14/2025 | 2/13/2045 | R$ 13,152,098.39 | 6/1/2025 | Ativa | T2022-063 | Obra de Substituição Completa - Substituição completa do banco de capacitores série BSIATP3 de 1242 Mvar, localizado na saída de linha da LT 765kV Itaberá - Tijuco Preto C3, por outro de características similares. | ||
| AXIA Energia | ITABERA | CR 750 kV 621 Mvar ITABERA BC2B SP | RB | FT CR 750 kV 621 Mvar ITABERA BC2B SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,744,934.93 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | CR 750 kV 621 Mvar ITABERA BC2B SP | RB | FT CR 750 kV 621 Mvar ITABERA BC2B SP | 062/2001 | IPCA | RMELP | REA 11449/2022 | R$ 13,152,098.39 | 6/1/2025 | Prevista | T2022-062 | Obra de Substituição Completa - Substituição completa do banco de capacitores série BSIATP2 de 1242 Mvar, localizado na saída de linha da LT 765kV Itaberá - Tijuco Preto C2, por outro de características similares. | 3T25 | |||
| AXIA Energia | ITABERA | CR 750 kV 621 Mvar ITABERA BC2A SP | RB | FT CR 750 kV 621 Mvar ITABERA BC2A SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,744,934.93 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | CR 750 kV 621 Mvar ITABERA BC2A SP | RB | FT CR 750 kV 621 Mvar ITABERA BC2A SP | 062/2001 | IPCA | RMELP | REA 11449/2022 | R$ 13,152,098.39 | 6/1/2025 | Prevista | T2022-062 | Obra de Substituição Completa - Substituição completa do banco de capacitores série BSIATP2 de 1242 Mvar, localizado na saída de linha da LT 765kV Itaberá - Tijuco Preto C2, por outro de características similares. | 3T25 | |||
| AXIA Energia | ITABERA | CR 750 kV 621 Mvar ITABERA BC1B SP | RB | FT CR 750 kV 621 Mvar ITABERA BC1B SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,744,934.93 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | CR 750 kV 621 Mvar ITABERA BC1B SP | RB | FT CR 750 kV 621 Mvar ITABERA BC1B SP | 062/2001 | IPCA | RMELP | REA 11449/2022 | R$ 13,152,098.39 | 6/1/2025 | Prevista | T2022-061 | Obra de Substituição Completa - Substituição completa do banco de capacitores série BSIATP1 de 1242 Mvar, localizado na saída de linha da LT 765kV Itaberá - Tijuco Preto C1, por outro de características similares. | ||||
| AXIA Energia | ITABERA | CR 750 kV 621 Mvar ITABERA BC1A SP | RB | FT CR 750 kV 621 Mvar ITABERA BC1A SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,744,934.93 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITABERA | CR 750 kV 621 Mvar ITABERA BC1A SP | RB | FT CR 750 kV 621 Mvar ITABERA BC1A SP | 062/2001 | IPCA | RMELP | REA 11449/2022 | R$ 13,152,098.39 | 6/1/2025 | Prevista | T2022-061 | Obra de Substituição Completa - Substituição completa do banco de capacitores série BSIATP1 de 1242 Mvar, localizado na saída de linha da LT 765kV Itaberá - Tijuco Preto C1, por outro de características similares. | ||||
| AXIA Energia Nordeste | ITABUNA III | MG 230 kV ITABUNA III MG2 BA | RB | FT MG 230 kV ITABUNA III MG2 BA | 061/2001 | IPCA | RBNI | DSP 1270/2022 | 4/5/2022 | 12/31/2042 | R$21,191.25 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 2 Módulo de Infraestrutura de Manobra 230 kV na SE Itabuna III, associados as Entradas de Linha 230kV para as SE´sFunil e Itapebi, em função do seccionamento da LT 230 kV Funil - Itapebi C2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABUNA III | EL 230 kV ITABUNA III LT 230 kV ITABUNA III /ITAPEBI C-1 BA | RB | FT LT 230 kV ITABUNA III /ITAPEBI C-1 BA | 061/2001 | IPCA | RBNI | DSP 1270/2022 | 4/5/2022 | 12/31/2042 | R$107,243.26 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Itabuna III, associada à Linha de Transmissão 230 kV Itabuna III – Itapebi C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITABUNA III | EL 230 kV ITABUNA III LT 230 kV FUNIL /ITABUNA III C-1 BA | RB | FT LT 230 kV FUNIL /ITABUNA III C-1 BA | 061/2001 | IPCA | RBNI | DSP 1270/2022 | 4/5/2022 | 12/31/2042 | R$107,243.26 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Itabuna III, associada à Linha de Transmissão 230 kV Funil – Itabuna III C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | ITAJAI | TR 230/138 kV ITAJAI TR4 SC | RBF | FT TR 230/138 kV ITAJAI TR4 SC | 057/2001 | IPCA | RBNI | REA 3339/2012 | 11/22/2014 | 7/2/2049 | R$ 1,661,513.24 | 6/1/2025 | Ativa | T2012-004 | Obra de Substituição Completa - Substituição, na SE Itajai, do autotransformador (TF4) 230/138 kV, 84 MVA, por outro autotransformador 230/138 kV de 150 MVA. RAP corrigida de modo a considerar a Receita autorizada total do equipamento novo. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | ITAJAI | TR 230/138 kV ITAJAI TR3 SC | RBF | FT TR 230/138 kV ITAJAI TR3 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$377,367.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITAJAI | TR 230/138 kV ITAJAI TR2 SC | RBF | FT TR 230/138 kV ITAJAI TR2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$377,367.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITAJAI | TR 230/138 kV ITAJAI TR1 SC | RBF | FT TR 230/138 kV ITAJAI TR1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$377,367.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITAJAI | MG 230 kV ITAJAI MG1 SC | RB | FT MG 230 kV ITAJAI MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$529,790.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITAJAI | MG 230 kV ITAJAI MG1 SC | RB | FT MG 230 kV ITAJAI MG1 SC | 057/2001 | IPCA | RBNI | REN 443/2011 | 6/19/2019 | 6/18/2034 | R$54,619.81 | 6/1/2025 | Ativa | MIM vinculado a EL de 138 kV para o seccionamento da LT 138 kV Brusque - Itajaí Itaipava, de propriedade da CELESC, na SE Itajaí. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | ITAJAI | MG 230 kV ITAJAI MG1 SC | RB | FT MG 230 kV ITAJAI MG1 SC | 057/2001 | IPCA | RBNI | REN 443/2011 | 6/19/2019 | 6/30/2038 | R$90,810.55 | 6/1/2025 | Ativa | MIM vinculado a EL de 138 kV para o seccionamento da LT 138 kV Brusque - Itajaí Itaipava, de propriedade da CELESC, na SE Itajaí. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | ITAJAI | MG 230 kV ITAJAI MG1 SC | RB | FT MG 230 kV ITAJAI MG1 SC | 057/2001 | IPCA | RBNI | DSP 4033/2021 | 12/22/2021 | 12/21/2036 | R$69,175.84 | 6/1/2025 | Ativa | Implantação do SEP para controle de carregamento das LTs 230 kV Blumenau - Itajaí C1 e C2.:SE ITJ * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | ITAJAI | MG 230 kV ITAJAI MG1 SC | RB | FT MG 230 kV ITAJAI MG1 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 12/22/2019 | 8/29/2036 | R$119,281.58 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | ITAJAI | MC 230 kV TR 230/138 kV ITAJAI TR4 SC | RBF | FT TR 230/138 kV ITAJAI TR4 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITAJAI | MC 230 kV TR 230/138 kV ITAJAI TR3 SC | RBF | FT TR 230/138 kV ITAJAI TR3 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITAJAI | MC 230 kV TR 230/138 kV ITAJAI TR2 SC | RBF | FT TR 230/138 kV ITAJAI TR2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITAJAI | MC 230 kV TR 230/138 kV ITAJAI TR1 SC | RBF | FT TR 230/138 kV ITAJAI TR1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITAJAI | MC 138 kV TR 230/138 kV ITAJAI TR4 SC | RBF | FT TR 230/138 kV ITAJAI TR4 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$100,865.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITAJAI | MC 138 kV TR 230/138 kV ITAJAI TR3 SC | RBF | FT TR 230/138 kV ITAJAI TR3 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$100,865.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITAJAI | MC 138 kV TR 230/138 kV ITAJAI TR2 SC | RBF | FT TR 230/138 kV ITAJAI TR2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$100,865.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITAJAI | MC 138 kV TR 230/138 kV ITAJAI TR1 SC | RBF | FT TR 230/138 kV ITAJAI TR1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$100,865.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITAJAI | IB 230 kV MG 230 kV ITAJAI MG1 SC IB1 | RB | FT MG 230 kV ITAJAI MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,146.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITAJAI | IB 138 kV MG 230 kV ITAJAI MG1 SC IB2 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,027.82 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | ITAJAI | EL 230 kV ITAJAI LT 230 kV BLUMENAU /ITAJAI C-2 SC | RB | FT LT 230 kV BLUMENAU /ITAJAI C-2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITAJAI | EL 230 kV ITAJAI LT 230 kV BLUMENAU /ITAJAI C-1 SC | RB | FT LT 230 kV BLUMENAU /ITAJAI C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | ITAJAI | EL 138 kV ITAJAI LT 138 kV ITAJAI /ITAJAIFAZENDA C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$149,126.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | ITAJAI | EL 138 kV ITAJAI LT 138 kV ILHOTA /ITAJAI C-2 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$149,126.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | ITAJAI | EL 138 kV ITAJAI LT 138 kV ILHOTA /ITAJAI C-2 SC | DIT | 057/2001 | IPCA | RCDM | REN 905/2020 | 1/27/2023 | 1/29/2053 | R$38,007.36 | 6/1/2025 | Ativa | Substituição de 4 Secionadoras sem Chave de Terra do vão Ilhota C-2 (CS581 / CS583 / CS585 / CS587).Capacidade do novo equipamento: Capacidade nominal de curto-circuito (kA): no mínimo 31,5 kA.. Superação por Corrente de Curto-Circuito simétrica Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | ITAJAI | EL 138 kV ITAJAI LT 138 kV ILHOTA /ITAJAI C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$149,126.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | ITAJAI | EL 138 kV ITAJAI LT 138 kV CAMBORIU M.B. /ITAJAI C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$149,126.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | ITAJAI | EL 138 kV ITAJAI ITAIPAVA C2 | DIT | 057/2001 | IPCA | RCDM | REN 443/2011 | 6/19/2019 | 6/18/2044 | R$ 1,225,885.02 | 6/1/2025 | Ativa | 2 ELs de 138 kV para o seccionamento da LT 138 kV Brusque - Itajaí Itaipava, de propriedade da CELESC, na SE Itajaí. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | ITAJAI | EL 138 kV ITAJAI DIST2 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$149,126.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | ITAJAI | EL 138 kV ITAJAI DIST1 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$149,126.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | ITAJAI | EL 138 kV ITAJAI BRUSQUE C2 | DIT | 057/2001 | IPCA | RCDM | REN 443/2011 | 6/19/2019 | 5/31/2044 | R$ 1,225,945.47 | 6/1/2025 | Ativa | 2 ELs de 138 kV para o seccionamento da LT 138 kV Brusque - Itajaí Itaipava, de propriedade da CELESC, na SE Itajaí. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | ITAJAI | EL 138 kV ITAJAI BRUSQUE C2 | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 9/30/2019 | 10/2/2049 | R$15,909.24 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | ITAPEBI | MG 230 kV ITAPEBI MG1 BA | RB | FT MG 230 kV ITAPEBI MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$435,666.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITAPEBI | MG 230 kV ITAPEBI MG1 BA | RB | FT MG 230 kV ITAPEBI MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/2/2022 | 8/19/2040 | R$200,410.68 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ITAPEBI | IB 230 kV MG 230 kV ITAPEBI MG1 BA IB1 | RB | FT MG 230 kV ITAPEBI MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,085.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITAPEBI | EL 230 kV ITAPEBI LT 230 kV ITAPEBI /VERACEL C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | ITAPEBI | EL 230 kV ITAPEBI LT 230 kV ITAPEBI /VERACEL C-1 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/7/2022 | 5/22/2040 | R$10,252.14 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | ITAPEBI | EL 230 kV ITAPEBI LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITAPEBI | EL 230 kV ITAPEBI LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/16/2020 | 7/26/2042 | R$10,173.52 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ITAPEBI | EL 230 kV ITAPEBI LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITAPEBI | EL 230 kV ITAPEBI LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/19/2020 | 6/12/2043 | R$10,473.33 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ITAPEBI | EL 230 kV ITAPEBI LT 230 kV ITABUNA III /ITAPEBI C-1 BA | RB | FT LT 230 kV ITABUNA III /ITAPEBI C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITAPEBI | EL 230 kV ITAPEBI LT 230 kV ITABUNA III /ITAPEBI C-1 BA | RB | FT LT 230 kV ITABUNA III /ITAPEBI C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/29/2020 | 10/27/2043 | R$9,955.49 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | ITAPEBI | EL 230 kV ITAPEBI LT 230 kV FUNIL /ITAPEBI C-1 BA | RB | FT LT 230 kV FUNIL /ITAPEBI C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | ITAPEBI | EL 230 kV ITAPEBI LT 230 kV FUNIL /ITAPEBI C-1 BA | RB | FT LT 230 kV FUNIL /ITAPEBI C-1 BA | 061/2001 | IPCA | RBNI | REA 5861/2016 | 3/5/2014 | 3/4/2042 | R$7,148.87 | 6/1/2025 | Ativa | Substituição dos RDPs das LTs 04F6 E 04F7 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | ITAPEBI | EL 230 kV ITAPEBI LT 230 kV FUNIL /ITAPEBI C-1 BA | RB | FT LT 230 kV FUNIL /ITAPEBI C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/24/2021 | 3/7/2040 | R$19,529.84 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITAPETI | EL 345 kV ITAPETI LT 345 kV ITAPETI /TIJUCO PRETO C-4 SP | RB | FT LT 345 kV ITAPETI /TIJUCO PRETO C-4 SP | 007/2006 | IPCA | RBL | CC 007/2006 | 4/27/2006 | 4/27/2036 | R$ 2,494,587.67 | 6/1/2025 | Ativa | T2000-067 | Contrato de Concessão nº 007/2006 *(Considera adicional de RGR relativo à prorrogação do encargo) | ||
| AXIA Energia | ITAPETI | EL 345 kV ITAPETI LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP | RB | FT LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP | 007/2006 | IPCA | RBL | CC 007/2006 | 4/27/2006 | 4/27/2036 | R$ 2,494,587.67 | 6/1/2025 | Ativa | T2000-067 | Contrato de Concessão nº 007/2006 *(Considera adicional de RGR relativo à prorrogação do encargo) | ||
| AXIA Energia | ITAPETI | EL 345 kV ITAPETI LT 345 kV ITAPETI /NORDESTE C-1 SP | RB | FT LT 345 kV ITAPETI /NORDESTE C-1 SP | 007/2006 | IPCA | RBL | CC 007/2006 | 4/27/2006 | 4/27/2036 | R$ 2,494,587.67 | 6/1/2025 | Ativa | T2000-067 | Contrato de Concessão nº 007/2006 *(Considera adicional de RGR relativo à prorrogação do encargo) | ||
| AXIA Energia | ITATIBA | EL 500 kV ITATIBA LT 500 kV ITATIBA /CAMPINAS C-1 SP | RB | FT LT 500 kV ITATIBA /CAMPINAS C-1 SP | 062/2001 | IPCA | RBNI | REA 6605/2017 | 6/18/2014 | 12/31/2042 | R$230,890.61 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 500 kV, arranjo disjuntor e meio, na Subestação Itatiba, associada à linha de transmissão 500 kV Campinas - Itatiba. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITATIBA | EL 500 kV ITATIBA LT 500 kV ITATIBA /CAMPINAS C-1 SP | RB | FT LT 500 kV ITATIBA /CAMPINAS C-1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/4/2021 | 3/7/2051 | R$127,559.76 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITATIBA | EL 500 kV ITATIBA LT 500 kV IBIUNA /ITATIBA C-1 SP | RB | FT LT 500 kV IBIUNA /ITATIBA C-1 SP | 062/2001 | IPCA | RBNI | REA 6605/2017 | 6/18/2014 | 12/31/2042 | R$230,890.61 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 500 kV, arranjo disjuntor e meio, na Subestação Itatiba, associada à linha de transmissão 500 kV Ibiúna Itatiba. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITATIBA | EL 500 kV ITATIBA LT 500 kV IBIUNA /ITATIBA C-1 SP | RB | FT LT 500 kV IBIUNA /ITATIBA C-1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/4/2021 | 3/7/2051 | R$127,559.76 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITUMBIARA | TT 13,8/0,12 kV ITUMBIARA TR53 MG | RB | FT TR 500/345 kV ITUMBIARA TR53 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | TT 13,8/0,12 kV ITUMBIARA TR50 MG | RB | FT TR 500/345 kV ITUMBIARA TR50 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | TT 13,8/0,12 kV ITUMBIARA TR2 MG | RB | FT TR 345/230 kV ITUMBIARA TRR4 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | TT 13,8/0,12 kV ITUMBIARA TR1 MG | RB | FT TR 345/230 kV ITUMBIARA TRR1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | TR 500/345 kV ITUMBIARA TRR1 MG | RB | FT TR 500/345 kV ITUMBIARA TRR1 MG | 062/2001 | IPCA | RMEL | REA 9185/2020 | 5/31/2024 | 5/30/2058 | R$ 1,915,500.30 | 6/1/2025 | Ativa | T2019-007 | Obra de Substituição Completa - Substituição do Módulo de Equipamento - Autransformador Monofásico TRR1, reserva, 500/345/13,8 kV - 186,67 MVA na SE Itumbiara | ||
| AXIA Energia | ITUMBIARA | TR 500/345 kV ITUMBIARA TR53 MG | RB | FT TR 500/345 kV ITUMBIARA TR53 MG | 062/2001 | IPCA | RMEL | REA 9185/2020 | 1/5/2024 | 1/4/2058 | R$ 5,746,500.91 | 6/1/2025 | Ativa | T2019-007 | Obra de Substituição Completa - Substituição do Módulo de Equipamento - Autransformador Monofásico AT-53 500/345/13,8 kV - 3 x 186,67 MVA na SE Itumbiara | ||
| AXIA Energia | ITUMBIARA | TR 500/345 kV ITUMBIARA TR50 MG | RB | FT TR 500/345 kV ITUMBIARA TR50 MG | 062/2001 | IPCA | RMEL | REA 9185/2020 | 7/15/2024 | 7/14/2058 | R$ 5,746,500.91 | 6/1/2025 | Ativa | T2019-007 | Obra de Substituição Completa - Substituição do Módulo de Equipamento - Autransformador Monofásico AT-50 500/345/13,8 kV - 3 x 186,67 MVA na SE Itumbiara | ||
| AXIA Energia | ITUMBIARA | TR 500/345 kV ITUMBIARA TR49 MG | RB | FT TR 500/345 kV ITUMBIARA TR49 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,828,419.99 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | TR 500/345 kV ITUMBIARA TR49 MG | RB | FT TR 500/345 kV ITUMBIARA TR49 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 7,016,337.21 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | TR 500/345 kV ITUMBIARA TR49 MG | RB | FT TR 500/345 kV ITUMBIARA TR49 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 7,521,889.09 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | TR 345/230 kV ITUMBIARA TRR4 MG | RB | FT TR 345/230 kV ITUMBIARA TRR4 MG | 062/2001 | IPCA | RMEL | REA 9185/2020 | 9/6/2023 | 9/5/2057 | R$ 2,982,203.21 | 6/1/2025 | Ativa | T2019-007 | Obra de Substituição Completa - Substituição do Módulo de Equipamento - Autransformador Trifásico AT-02 345/230/13,8 kV - 225 MVA na SE Itumbiara | ||
| AXIA Energia | ITUMBIARA | TR 345/230 kV ITUMBIARA TRR1 MG | RB | FT TR 345/230 kV ITUMBIARA TRR1 MG | 062/2001 | IPCA | RBNI | REA 4326/2013 | 12/28/2016 | 8/27/2050 | R$ 1,451,748.58 | 6/1/2025 | Ativa | T2013-049 | Aquisição de autotransformador trifásico 345/230/13,8 kV, de 225 MVA, para atuar como reserva. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | ITUMBIARA | TR 345/230 kV ITUMBIARA TR3 MG | RB | FT TR 345/230 kV ITUMBIARA TR3 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$588,802.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | TR 345/230 kV ITUMBIARA TR3 MG | RB | FT TR 345/230 kV ITUMBIARA TR3 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,259,457.04 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | TR 345/230 kV ITUMBIARA TR3 MG | RB | FT TR 345/230 kV ITUMBIARA TR3 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,422,258.90 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | TR 345/230 kV ITUMBIARA TR1 MG | RB | FT TR 345/230 kV ITUMBIARA TR1 MG | 062/2001 | IPCA | RMEL | REA 9185/2020 | 5/31/2024 | 5/30/2058 | R$ 2,982,203.21 | 6/1/2025 | Ativa | T2019-007 | Obra de Substituição Completa - Substituição do Módulo de Equipamento - Autransformador Trifásico AT-01 345/230/13,8 kV - 225 MVA na SE Itumbiara | ||
| AXIA Energia | ITUMBIARA | RTL 500 kV 37 Mvar ITUMBIARA RTR4 MG | RB | FT RTL 500 kV 37 Mvar ITUMBIARA RTR4 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$214,459.55 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | RTL 500 kV 111 Mvar ITUMBIARA RTEBIM MG | RB | FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,563,639.00 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | RTL 500 kV 111 Mvar ITUMBIARA RTEBIM MG | RB | FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 10/15/2014 | 10/14/2035 | R$38,486.04 | 6/1/2025 | Ativa | Substituição 3 para-raios no vão do reator da LI Emborcação - Itumbiara - Nº Oper: PR9860R - PMI (005952/2015) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | RTL 500 kV 111 Mvar ITUMBIARA RTEBIM MG | RB | FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG | 062/2001 | IPCA | RMEL | REA 9185/2020 | 10/26/2020 | 9/3/2055 | R$835,663.84 | 6/1/2025 | Ativa | T2019-006 | Obra de Substituição Parcial - Substituição da fase A do banco de reatores 500 KV da LT 500 KV Itumbiara - Emborcação. Após a entrada em operação comercial do empreendimento T2019-006, um terço das receitas referente a Portaria 120/2016 (parcela econômica) e Portaria 579/2012 deverão ser canceladas. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | ITUMBIARA | RTL 500 kV 111 Mvar ITUMBIARA RTEBIM MG | RB | FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/21/2017 | 5/20/2045 | R$66,085.11 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITUMBIARA | RTL 345 kV 96 Mvar ITUMBIARA RTCL MG | RB | FT LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$572,319.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | RTL 345 kV 96 Mvar ITUMBIARA RTCL MG | RB | FT LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,196,206.74 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | RTL 345 kV 96 Mvar ITUMBIARA RTCL MG | RB | FT LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | 062/2001 | IPCA | RBNI | REA 4347/2013 | 2/22/2017 | 6/16/2044 | R$4,771.31 | 6/1/2025 | Ativa | Substituição de RDP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | RTL 345 kV 96 Mvar ITUMBIARA RTCL MG | RB | FT LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 5/6/2014 | 11/29/2034 | R$26,484.81 | 6/1/2025 | Ativa | Substituição 3 para-raios no vão do reator da LT Itumbiara - Porto Colömbia - Nº Oper: PR RTIMCL- PMI (005959/2015) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | RTL 345 kV 96 Mvar ITUMBIARA RTCL MG | RB | FT LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | 062/2001 | IPCA | RMEL | REA 9185/2020 | 10/26/2020 | 12/8/2054 | R$599,572.02 | 6/1/2025 | Ativa | T2019-006 | Obra de Substituição Parcial - Substituição da fase A do banco de reatores 345 KV da LT 345 KV Itumbiara - Porto Colômbia. Após a entrada em operação comercial do empreendimento T2019-006, um terço das receitas referente a Portaria 120/2016 (parcela econômica) e Portaria 579/2012 deverão ser canceladas. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | ITUMBIARA | RTL 345 kV 96 Mvar ITUMBIARA RTCL MG | RB | FT LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 4/6/2014 | 4/5/2042 | R$14,160.29 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITUMBIARA | RTL 345 kV 32 Mvar ITUMBIARA RTR5 MG | RB | FT RTL 345 kV 32 Mvar ITUMBIARA RTR5 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$214,459.55 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MG 500 kV ITUMBIARA MG1 MG | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,447,676.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MG 500 kV ITUMBIARA MG1 MG | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RBNI | REA 4326/2013 | 12/28/2016 | 5/3/2043 | R$125,903.39 | 6/1/2025 | Ativa | T2013-049 | Complementação do módulo geral da Subestação Itumbiara para instalação do transformador trifásico 345/230 kV, de 225 MVA, proveniente da Subestação Bandeirantes, com finalidade de reserva. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | ITUMBIARA | MG 500 kV ITUMBIARA MG1 MG | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 9,392,658.89 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MG 500 kV ITUMBIARA MG1 MG | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 10,069,433.14 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MG 500 kV ITUMBIARA MG1 MG | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/31/2017 | 3/27/2033 | R$ 647.02 | 6/1/2025 | Ativa | Substituição de IHMs do Sistema de Supervisão e Controle Local (SAGE) por obsolescência ou por atualização tecnológica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MG 500 kV ITUMBIARA MG1 MG | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 8/25/2017 | 6/20/2032 | R$9,471.45 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MG 500 kV ITUMBIARA MG1 MG | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RBNI | REA 5861/2016 | 9/13/2017 | 8/9/2034 | R$37,501.15 | 6/1/2025 | Ativa | Adequação - Serviços auxiliares de corrente contínua (CC) do sistema de telecomunicações * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 * Receita alterada no recurso contra a REH 2.407/2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MG 500 kV ITUMBIARA MG1 MG | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RBNI | REA 9185/2020 | 8/7/2023 | 8/6/2054 | R$78,382.45 | 6/1/2025 | Ativa | T2019-004 | Adequação do Módulo de Infraestrutura de Manobra 500 kV - Complementação do Módulo Geral referente a instalação da interligação de barras entre a EL 500 kV Marimbondo e a EL 500 kV Emborcação na SE Itumbiara | ||
| AXIA Energia | ITUMBIARA | MG 500 kV ITUMBIARA MG1 MG | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RBNI | REA 9185/2020 | 8/7/2023 | 8/6/2054 | R$97,942.55 | 6/1/2025 | Ativa | T2019-004 | Adequação do Módulo de Infraestrutura de Manobra 500 kV - Complementação do Módulo Geral referente a instalação da interligação de barras entre a EL 500 kV Emborcação e o vão TR-53 na SE Itumbiara | ||
| AXIA Energia | ITUMBIARA | MG 500 kV ITUMBIARA MG1 MG | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RBNI | REA 8314/2019 | 2/11/2021 | 2/10/2036 | R$9,759.34 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000394/2014. (FT: LT 500 kV ITUMBIARA / SAO SIMAO-SE C 1 MG) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MG 500 kV ITUMBIARA MG1 MG | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RBNI | REA 8314/2019 | 2/11/2021 | 2/10/2036 | R$9,759.34 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000397/2014. (FT: LT 500 kV EMBORCACAO / ITUMBIARA C 1 MG) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MG 500 kV ITUMBIARA MG1 MG | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/19/2017 | 9/6/2040 | R$619,855.92 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 500/345 kV ITUMBIARA TR53 MG | RB | FT TR 500/345 kV ITUMBIARA TR53 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 500/345 kV ITUMBIARA TR53 MG | RB | FT TR 500/345 kV ITUMBIARA TR53 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 10/3/2014 | 10/2/2035 | R$38,422.28 | 6/1/2025 | Ativa | Substituição 3 para-raios no vão do banco de autotransformadores T53 - Nº Oper: PR925 - PMI (005949/2015) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 500/345 kV ITUMBIARA TR53 MG | RB | FT TR 500/345 kV ITUMBIARA TR53 MG | 062/2001 | IPCA | RBNI | REA 5861/2016 | 3/13/2021 | 3/12/2036 | R$94,236.73 | 6/1/2025 | Ativa | Banco de Autotrafos AT53 500/345/13,8 kV - 560 MVA - Modernização dos relés de proteção, devendo este ser estendido aos sistemas de comando, controle, supervisão, assim como os serviços auxiliares * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 500/345 kV ITUMBIARA TR53 MG | RB | FT TR 500/345 kV ITUMBIARA TR53 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/4/2018 | 12/28/2048 | R$209,928.93 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 500/345 kV ITUMBIARA TR50 MG | RB | FT TR 500/345 kV ITUMBIARA TR50 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 500/345 kV ITUMBIARA TR50 MG | RB | FT TR 500/345 kV ITUMBIARA TR50 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,518,075.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 500/345 kV ITUMBIARA TR50 MG | RB | FT TR 500/345 kV ITUMBIARA TR50 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/7/2014 | 1/31/2036 | R$38,787.01 | 6/1/2025 | Ativa | Substituição 3 para-raios no vão do banco de autotransformadores T50 - Nº Oper: PR915 - PMI (005948/2015) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 500/345 kV ITUMBIARA TR50 MG | RB | FT TR 500/345 kV ITUMBIARA TR50 MG | 062/2001 | IPCA | RBNI | REA 5861/2016 | 5/7/2021 | 5/6/2036 | R$89,054.56 | 6/1/2025 | Ativa | Banco de Autotrafos AT50 525/345/13,8 kV - 560 MVA - Modernização dos relés de proteção, devendo este ser estendido aos sistemas de comando, controle, supervisão, assim como os serviços auxiliares. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 500/345 kV ITUMBIARA TR50 MG | RB | FT TR 500/345 kV ITUMBIARA TR50 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 4/7/2020 | 9/15/2044 | R$297,277.23 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 500/345 kV ITUMBIARA TR49 MG | RB | FT TR 500/345 kV ITUMBIARA TR49 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 500/345 kV ITUMBIARA TR49 MG | RB | FT TR 500/345 kV ITUMBIARA TR49 MG | 062/2001 | IPCA | RBNI | REA 5861/2016 | 4/10/2021 | 4/9/2036 | R$96,301.01 | 6/1/2025 | Ativa | Banco de Autotrafos AT49 500/345/13,8 kV - 560 MVA - Modernização dos relés de proteção, devendo este ser estendido aos sistemas de comando, controle, supervisão, assim como os serviços auxiliares * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 500/345 kV ITUMBIARA TR49 MG | RB | FT TR 500/345 kV ITUMBIARA TR49 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 8/15/2021 | 8/18/2051 | R$209,562.17 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 13,8/500 kV ITUMBIARA TRG6 MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 13,8/500 kV ITUMBIARA TRG6 MG | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 3/5/2015 | 7/28/2036 | R$39,274.90 | 6/1/2025 | Ativa | Substituição 3 para-raios no vão da Unidade 6 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 13,8/500 kV ITUMBIARA TRG6 MG | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/9/2022 | 7/10/2052 | R$194,719.73 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 13,8/500 kV ITUMBIARA TRG5 MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 13,8/500 kV ITUMBIARA TRG5 MG | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 4/28/2015 | 10/21/2036 | R$39,562.67 | 6/1/2025 | Ativa | Substituição 3 para-raios no vão da Unidade 5 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 13,8/500 kV ITUMBIARA TRG5 MG | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/17/2021 | 4/26/2051 | R$287,686.03 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 13,8/500 kV ITUMBIARA TRG4 MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 13,8/500 kV ITUMBIARA TRG4 MG | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 4/23/2015 | 10/16/2036 | R$39,536.73 | 6/1/2025 | Ativa | Substituição 3 para-raios no vão da Unidade 4 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 13,8/500 kV ITUMBIARA TRG4 MG | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/12/2021 | 8/11/2051 | R$189,150.61 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 13,8/500 kV ITUMBIARA TRG3 MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 13,8/500 kV ITUMBIARA TRG3 MG | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 10/15/2015 | 10/14/2037 | R$40,462.60 | 6/1/2025 | Ativa | Substituição 3 para-raios no vão da Unidade 3 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 13,8/500 kV ITUMBIARA TRG3 MG | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/9/2022 | 8/2/2052 | R$268,760.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 13,8/500 kV ITUMBIARA TRG2 MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 13,8/500 kV ITUMBIARA TRG2 MG | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 1/18/2015 | 4/12/2036 | R$39,018.07 | 6/1/2025 | Ativa | Substituição 3 para-raios no vão da Unidade 2 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 13,8/500 kV ITUMBIARA TRG2 MG | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/9/2022 | 6/3/2052 | R$245,017.42 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 13,8/500 kV ITUMBIARA TRG1 MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 13,8/500 kV ITUMBIARA TRG1 MG | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 3/31/2015 | 8/23/2036 | R$39,410.33 | 6/1/2025 | Ativa | Substituição 3 para-raios no vão da Unidade 1 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | ITUMBIARA | MC 500 kV TR 13,8/500 kV ITUMBIARA TRG1 MG | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/9/2022 | 8/19/2052 | R$206,819.04 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | ITUMBIARA | MC 500 kV RTL 500 kV 111 Mvar ITUMBIARA RTEBIM MG | RB | FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,673.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 500/345 kV ITUMBIARA TR53 MG | RB | FT TR 500/345 kV ITUMBIARA TR53 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 500/345 kV ITUMBIARA TR53 MG | RB | FT TR 500/345 kV ITUMBIARA TR53 MG | 062/2001 | IPCA | RBNI | REA 4068/2013 | 6/24/2016 | 2/14/2045 | R$74,054.77 | 6/1/2025 | Ativa | Substituição de 03 transformadores de corrente do módulo de conexão do T53 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 500/345 kV ITUMBIARA TR53 MG | RB | FT TR 500/345 kV ITUMBIARA TR53 MG | 062/2001 | IPCA | RBNI | REA 4347/2013 | 2/22/2017 | 6/16/2044 | R$6,292.67 | 6/1/2025 | Ativa | Substituição de RDP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 500/345 kV ITUMBIARA TR53 MG | RB | FT TR 500/345 kV ITUMBIARA TR53 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 10/3/2014 | 10/2/2035 | R$27,098.31 | 6/1/2025 | Ativa | Substituição 3 para-raios no vão do banco de autotransformadores T53 - Nº Oper: PR847 - PMI (005954/2015) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 500/345 kV ITUMBIARA TR53 MG | RB | FT TR 500/345 kV ITUMBIARA TR53 MG | 062/2001 | IPCA | RBNI | REA 5861/2016 | 3/13/2021 | 3/12/2036 | R$94,236.73 | 6/1/2025 | Ativa | Banco de Autotrafos AT53 500/345/13,8 kV - 560 MVA - Modernização dos relés de proteção, devendo este ser estendido aos sistemas de comando, controle, supervisão, assim como os serviços auxiliares * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 500/345 kV ITUMBIARA TR53 MG | RB | FT TR 500/345 kV ITUMBIARA TR53 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2013 | 12/31/2045 | R$192,103.78 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 500/345 kV ITUMBIARA TR50 MG | RB | FT TR 500/345 kV ITUMBIARA TR50 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 500/345 kV ITUMBIARA TR50 MG | RB | FT TR 500/345 kV ITUMBIARA TR50 MG | 062/2001 | IPCA | RBNI | REA 1814/2009 | 1/22/2012 | 4/15/2039 | R$165,003.57 | 6/1/2025 | Ativa | Substituição de 1 DJ no Vão do AT50 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 500/345 kV ITUMBIARA TR50 MG | RB | FT TR 500/345 kV ITUMBIARA TR50 MG | 062/2001 | IPCA | RBNI | REA 4068/2013 | 6/24/2016 | 2/14/2045 | R$74,054.77 | 6/1/2025 | Ativa | Substituição de 03 transformadores de corrente do módulo de conexão do T50 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 500/345 kV ITUMBIARA TR50 MG | RB | FT TR 500/345 kV ITUMBIARA TR50 MG | 062/2001 | IPCA | RBNI | REA 4347/2013 | 2/22/2017 | 6/16/2044 | R$6,292.67 | 6/1/2025 | Ativa | Substituição de RDP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 500/345 kV ITUMBIARA TR50 MG | RB | FT TR 500/345 kV ITUMBIARA TR50 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/7/2014 | 1/31/2036 | R$27,355.52 | 6/1/2025 | Ativa | Substituição 3 para-raios no vão do banco de autotransformadores T50 - Nº Oper: PR837 - PMI (005953/2015) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 500/345 kV ITUMBIARA TR50 MG | RB | FT TR 500/345 kV ITUMBIARA TR50 MG | 062/2001 | IPCA | RBNI | REA 5861/2016 | 5/7/2021 | 5/6/2036 | R$89,054.56 | 6/1/2025 | Ativa | Banco de Autotrafos AT50 525/345/13,8 kV - 560 MVA - Modernização dos relés de proteção, devendo este ser estendido aos sistemas de comando, controle, supervisão, assim como os serviços auxiliares. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 500/345 kV ITUMBIARA TR49 MG | RB | FT TR 500/345 kV ITUMBIARA TR49 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 500/345 kV ITUMBIARA TR49 MG | RB | FT TR 500/345 kV ITUMBIARA TR49 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,046,877.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 500/345 kV ITUMBIARA TR49 MG | RB | FT TR 500/345 kV ITUMBIARA TR49 MG | 062/2001 | IPCA | RBNI | REA 4347/2013 | 2/22/2017 | 6/16/2044 | R$6,292.67 | 6/1/2025 | Ativa | Substituição de RDP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 500/345 kV ITUMBIARA TR49 MG | RB | FT TR 500/345 kV ITUMBIARA TR49 MG | 062/2001 | IPCA | RBNI | REA 5861/2016 | 4/10/2021 | 4/9/2036 | R$96,301.01 | 6/1/2025 | Ativa | Banco de Autotrafos AT49 500/345/13,8 kV - 560 MVA - Modernização dos relés de proteção, devendo este ser estendido aos sistemas de comando, controle, supervisão, assim como os serviços auxiliares * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 345/230 kV ITUMBIARA TRR4 MG | RB | FT TR 345/230 kV ITUMBIARA TRR4 MG | 062/2001 | IPCA | RBNI | REA 9185/2020 | 9/4/2023 | 9/3/2051 | R$ 1,677,582.91 | 6/1/2025 | Ativa | T2019-005 | Instalação do Módulo de Manobra - Conexão do Transformador 345 kV, arranjo BD5, referente ao 4º TR na SE Itumbiara | ||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 345/230 kV ITUMBIARA TRR4 MG | RB | FT TR 345/230 kV ITUMBIARA TRR4 MG | 062/2001 | IPCA | RBNI | REA 9185/2020 | 9/4/2023 | 9/3/2054 | R$452,597.65 | 6/1/2025 | Ativa | T2019-005 | Adequação do Módulo de Manobra - Conexão do Transformador 4º TR 345 kV referente a extensão de Barramento A e B na SE Itumbiara. | ||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 345/230 kV ITUMBIARA TRR1 MG | RB | FT TR 345/230 kV ITUMBIARA TRR1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 345/230 kV ITUMBIARA TRR1 MG | RB | FT TR 345/230 kV ITUMBIARA TRR1 MG | 062/2001 | IPCA | RBNI | REA 1814/2009 | 4/15/2012 | 10/8/2039 | R$166,873.58 | 6/1/2025 | Ativa | Substituição de 1 DJ no Vão do AT2 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 345/230 kV ITUMBIARA TRR1 MG | RB | FT TR 345/230 kV ITUMBIARA TRR1 MG | 062/2001 | IPCA | RMEL | REN 643/2014 | 7/26/2015 | 4/19/2037 | R$28,238.06 | 6/1/2025 | Ativa | Substituição 3 para-raios no vão do banco de autotransformadores TR02 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 345/230 kV ITUMBIARA TRR1 MG | RB | FT TR 345/230 kV ITUMBIARA TRR1 MG | 062/2001 | IPCA | RBNI | REA 4068/2013 | 6/24/2016 | 2/14/2045 | R$257,240.45 | 6/1/2025 | Ativa | Substituição de 05 chaves seccionadoras do módulo de conexão do AT02: SC 821, 823, 825, 827 e 829. Substituição de 03 transformadores de corrente. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 345/230 kV ITUMBIARA TRR1 MG | RB | FT TR 345/230 kV ITUMBIARA TRR1 MG | 062/2001 | IPCA | RBNI | REA 4347/2013 | 2/22/2017 | 6/16/2044 | R$4,771.31 | 6/1/2025 | Ativa | Substituição de RDP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 345/230 kV ITUMBIARA TRR1 MG | RB | FT TR 345/230 kV ITUMBIARA TRR1 MG | 062/2001 | IPCA | RBNI | REA 5861/2016 | 11/30/2020 | 11/29/2035 | R$63,055.55 | 6/1/2025 | Ativa | Banco de Autotrafos AT02 345/230/13,8 kV - 225 MVA - Modernização dos relés de proteção, devendo este ser estendido aos sistemas de comando, controle, supervisão, assim como os serviços auxiliares * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 345/230 kV ITUMBIARA TR3 MG | RB | FT TR 345/230 kV ITUMBIARA TR3 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 345/230 kV ITUMBIARA TR3 MG | RB | FT TR 345/230 kV ITUMBIARA TR3 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,046,877.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 345/230 kV ITUMBIARA TR3 MG | RB | FT TR 345/230 kV ITUMBIARA TR3 MG | 062/2001 | IPCA | RBNI | REA 4347/2013 | 2/22/2017 | 6/16/2044 | R$4,771.31 | 6/1/2025 | Ativa | Substituição de RDP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 345/230 kV ITUMBIARA TR3 MG | RB | FT TR 345/230 kV ITUMBIARA TR3 MG | 062/2001 | IPCA | RBNI | REA 5861/2016 | 7/23/2021 | 7/22/2036 | R$99,343.31 | 6/1/2025 | Ativa | Banco de Autotrafos AT03 345/230/13,8 kV - 225 MVA Modernização dos relés de proteção, devendo este ser estendido aos sistemas de comando, controle, supervisão, assim como os serviços auxiliares. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 345/230 kV ITUMBIARA TR1 MG | RB | FT TR 345/230 kV ITUMBIARA TR1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 345/230 kV ITUMBIARA TR1 MG | RB | FT TR 345/230 kV ITUMBIARA TR1 MG | 062/2001 | IPCA | RBNI | REA 1814/2009 | 2/12/2012 | 6/6/2039 | R$165,496.15 | 6/1/2025 | Ativa | Substituição de 1 DJ no Vão do AT1 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 345/230 kV ITUMBIARA TR1 MG | RB | FT TR 345/230 kV ITUMBIARA TR1 MG | 062/2001 | IPCA | RBNI | REA 4068/2013 | 1/30/2016 | 4/22/2044 | R$36,134.86 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de conexão do AT01: SC 811 Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 345/230 kV ITUMBIARA TR1 MG | RB | FT TR 345/230 kV ITUMBIARA TR1 MG | 062/2001 | IPCA | RBNI | REA 4068/2013 | 1/31/2016 | 4/23/2044 | R$36,138.33 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de conexão do AT01: SC 813 Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 345/230 kV ITUMBIARA TR1 MG | RB | FT TR 345/230 kV ITUMBIARA TR1 MG | 062/2001 | IPCA | RBNI | REA 4068/2013 | 2/4/2016 | 5/28/2044 | R$36,152.63 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de conexão do AT01: SC 815 Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 345/230 kV ITUMBIARA TR1 MG | RB | FT TR 345/230 kV ITUMBIARA TR1 MG | 062/2001 | IPCA | RBNI | REA 4068/2013 | 2/4/2016 | 5/28/2044 | R$36,152.63 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de conexão do AT01: SC 817 Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 345/230 kV ITUMBIARA TR1 MG | RB | FT TR 345/230 kV ITUMBIARA TR1 MG | 062/2001 | IPCA | RBNI | REA 4068/2013 | 2/4/2016 | 5/28/2044 | R$36,152.63 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de conexão do AT01: SC 819 Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 345/230 kV ITUMBIARA TR1 MG | RB | FT TR 345/230 kV ITUMBIARA TR1 MG | 062/2001 | IPCA | RBNI | REA 4068/2013 | 2/4/2016 | 5/28/2044 | R$73,075.43 | 6/1/2025 | Ativa | Substituição de 03 transformadores de corrente do módulo de conexão do AT01 Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 345/230 kV ITUMBIARA TR1 MG | RB | FT TR 345/230 kV ITUMBIARA TR1 MG | 062/2001 | IPCA | RMEL | REN 643/2014 | 8/10/2015 | 6/3/2037 | R$28,295.31 | 6/1/2025 | Ativa | Substituição 3 para-raios no vão do banco de autotransformadores TR01 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 345/230 kV ITUMBIARA TR1 MG | RB | FT TR 345/230 kV ITUMBIARA TR1 MG | 062/2001 | IPCA | RBNI | REA 4347/2013 | 2/22/2017 | 6/16/2044 | R$4,771.31 | 6/1/2025 | Ativa | Substituição de RDP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 345/230 kV ITUMBIARA TR1 MG | RB | FT TR 345/230 kV ITUMBIARA TR1 MG | 062/2001 | IPCA | RBNI | REA 5861/2016 | 12/19/2020 | 12/18/2035 | R$93,558.34 | 6/1/2025 | Ativa | Banco de Autotrafos AT01 345/230/13,8 kV - 225 MVA - Modernização dos relés de proteção, devendo este ser estendido aos sistemas de comando, controle, supervisão, assim como os serviços auxiliares * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV TR 345/230 kV ITUMBIARA TR1 MG | RB | FT TR 345/230 kV ITUMBIARA TR1 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/16/2021 | 6/15/2036 | R$46,816.78 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 345 kV RTL 345 kV 96 Mvar ITUMBIARA RTCL MG | RB | FT LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,441.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MC 230 kV TR 345/230 kV ITUMBIARA TRR4 MG | RB | FT TR 345/230 kV ITUMBIARA TRR4 MG | 062/2001 | IPCA | RBNI | REA 9185/2020 | 9/4/2023 | 9/3/2050 | R$ 1,282,848.95 | 6/1/2025 | Ativa | T2019-005 | Instalação do Módulo de Manobra - Conexão do Transformador 230 kV, arranjo BD5, referente ao 4º TR na SE Itumbiara | ||
| AXIA Energia | ITUMBIARA | MC 230 kV TR 345/230 kV ITUMBIARA TRR4 MG | RB | FT TR 345/230 kV ITUMBIARA TRR4 MG | 062/2001 | IPCA | RBNI | REA 9185/2020 | 9/4/2023 | 9/3/2054 | R$162,802.39 | 6/1/2025 | Ativa | T2019-005 | Adequação do Módulo de Manobra - Conexão do Transformador 4º TR 230 kV referente a extensão de Barramento A e B na SE Itumbiara | ||
| AXIA Energia | ITUMBIARA | MC 230 kV TR 345/230 kV ITUMBIARA TRR1 MG | RB | FT TR 345/230 kV ITUMBIARA TRR1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$154,583.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MC 230 kV TR 345/230 kV ITUMBIARA TRR1 MG | RB | FT TR 345/230 kV ITUMBIARA TRR1 MG | 062/2001 | IPCA | RBNI | REA 1814/2009 | 4/15/2012 | 10/8/2039 | R$116,633.18 | 6/1/2025 | Ativa | Substituição de 1 DJ no vão do AT02 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 230 kV TR 345/230 kV ITUMBIARA TRR1 MG | RB | FT TR 345/230 kV ITUMBIARA TRR1 MG | 062/2001 | IPCA | RMEL | REN 643/2014 | 7/26/2015 | 4/19/2037 | R$19,253.52 | 6/1/2025 | Ativa | Substituição 3 para-raios no vão do banco de transformadores TR02 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 230 kV TR 345/230 kV ITUMBIARA TRR1 MG | RB | FT TR 345/230 kV ITUMBIARA TRR1 MG | 062/2001 | IPCA | RBNI | REA 5861/2016 | 11/30/2020 | 11/29/2035 | R$94,583.33 | 6/1/2025 | Ativa | Banco de Autotrafos AT02 345/230/13,8 kV - 225 MVA - Modernização dos relés de proteção, devendo este ser estendido aos sistemas de comando, controle, supervisão, assim como os serviços auxiliares * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 230 kV TR 345/230 kV ITUMBIARA TR3 MG | RB | FT TR 345/230 kV ITUMBIARA TR3 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$154,583.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MC 230 kV TR 345/230 kV ITUMBIARA TR3 MG | RB | FT TR 345/230 kV ITUMBIARA TR3 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$593,194.91 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MC 230 kV TR 345/230 kV ITUMBIARA TR3 MG | RB | FT TR 345/230 kV ITUMBIARA TR3 MG | 062/2001 | IPCA | RBNI | REA 5861/2016 | 7/23/2021 | 7/22/2036 | R$99,343.30 | 6/1/2025 | Ativa | Banco de Autotrafos AT03 345/230/13,8 kV - 225 MVA Modernização dos relés de proteção, devendo este ser estendido aos sistemas de comando, controle, supervisão, assim como os serviços auxiliares. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 230 kV TR 345/230 kV ITUMBIARA TR1 MG | RB | FT TR 345/230 kV ITUMBIARA TR1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$154,583.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MC 230 kV TR 345/230 kV ITUMBIARA TR1 MG | RB | FT TR 345/230 kV ITUMBIARA TR1 MG | 062/2001 | IPCA | RBNI | REA 1814/2009 | 2/12/2012 | 6/6/2039 | R$115,670.47 | 6/1/2025 | Ativa | Substituição de 1 DJ no vão AT01 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 230 kV TR 345/230 kV ITUMBIARA TR1 MG | RB | FT TR 345/230 kV ITUMBIARA TR1 MG | 062/2001 | IPCA | RMEL | REN 643/2014 | 8/10/2015 | 6/3/2037 | R$19,292.56 | 6/1/2025 | Ativa | Substituição 3 para-raios no vão do banco de transformadores TR01 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 230 kV TR 345/230 kV ITUMBIARA TR1 MG | RB | FT TR 345/230 kV ITUMBIARA TR1 MG | 062/2001 | IPCA | RBNI | REA 5861/2016 | 12/19/2020 | 12/18/2035 | R$93,558.34 | 6/1/2025 | Ativa | Banco de Autotrafos AT01 345/230/13,8 kV - 225 MVA - Modernização dos relés de proteção, devendo este ser estendido aos sistemas de comando, controle, supervisão, assim como os serviços auxiliares * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | MC 230 kV CR 230 kV 33,9 Mvar ITUMBIARA BC1 MG | RB | FT CR 230 kV 33,9 Mvar ITUMBIARA BC1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$159,146.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MC 230 kV CR 230 kV 183 Mvar ITUMBIARA BC2 MG | RB | FT CR 230 kV 183 Mvar ITUMBIARA BC2 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$159,146.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MC 13,8 kV TT 13,8/0,12 kV ITUMBIARA TR53 MG | RB | FT TR 500/345 kV ITUMBIARA TR53 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MC 13,8 kV TT 13,8/0,12 kV ITUMBIARA TR50 MG | RB | FT TR 500/345 kV ITUMBIARA TR50 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MC 13,8 kV TT 13,8/0,12 kV ITUMBIARA TR2 MG | RB | FT TR 345/230 kV ITUMBIARA TRR4 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | MC 13,8 kV TT 13,8/0,12 kV ITUMBIARA TR1 MG | RB | FT TR 345/230 kV ITUMBIARA TRR1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | IB 500 kV MG 500 kV ITUMBIARA MG1 MG IB5 | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RBNI | REA 9185/2020 | 8/7/2023 | 8/6/2054 | R$ 1,725,270.90 | 6/1/2025 | Ativa | T2019-004 | Instalação da interligação de barras entre a EL 500 kV Emborcação e o vão TR-53 na SE Itumbiara | ||
| AXIA Energia | ITUMBIARA | IB 500 kV MG 500 kV ITUMBIARA MG1 MG IB4 | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RBNI | REA 9185/2020 | 8/7/2023 | 8/6/2054 | R$ 1,725,270.90 | 6/1/2025 | Ativa | T2019-004 | instalação da interligação de barras entre a EL 500 kV Marimbondo e a EL 500 kV Emborcação na SE Itumbiara | ||
| AXIA Energia | ITUMBIARA | IB 500 kV MG 500 kV ITUMBIARA MG1 MG IB3 | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | IB 500 kV MG 500 kV ITUMBIARA MG1 MG IB2 | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB2 | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB2 | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$928,957.53 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB2 | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$995,892.20 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB1 | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB1 | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RBNI | REA 1814/2009 | 3/23/2012 | 8/15/2039 | R$156,061.27 | 6/1/2025 | Ativa | Substituição de 1 DJ no Vão de Amarre *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB1 | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RBNI | REA 4068/2013 | 11/22/2015 | 12/14/2043 | R$33,765.21 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de interligação de barras: SC 801 Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB1 | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RBNI | REA 4068/2013 | 6/24/2016 | 2/14/2045 | R$34,466.21 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de interligação de barras: SC 803 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | IB 230 kV MG 500 kV ITUMBIARA MG1 MG IB1 | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$127,017.00 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | IB 230 kV MG 500 kV ITUMBIARA MG1 MG IB1 | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RBNI | REA 1814/2009 | 4/4/2012 | 9/27/2039 | R$119,608.15 | 6/1/2025 | Ativa | Substituição de 1 DJ no vão de Amarre *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | IB 230 kV MG 500 kV ITUMBIARA MG1 MG IB1 | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$487,412.14 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | IB 230 kV MG 500 kV ITUMBIARA MG1 MG IB1 | RB | FT MG 500 kV ITUMBIARA MG1 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$522,531.91 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | EL 500 kV ITUMBIARA LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG | RB | FT LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | EL 500 kV ITUMBIARA LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG | RB | FT LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 9/15/2014 | 8/10/2035 | R$38,315.10 | 6/1/2025 | Ativa | Substituição 3 para-raios no vão da LI Itumbiara - São Simão - Nº Oper: PR9850T - PMI (005950/2015) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 500 kV ITUMBIARA LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG | RB | FT LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG | 062/2001 | IPCA | RBNI | REA 4347/2013 | 4/9/2018 | 4/8/2033 | R$12,221.19 | 6/1/2025 | Ativa | Substituição de RDP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 500 kV ITUMBIARA LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG | RB | FT LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG | 062/2001 | IPCA | RBNI | REA 5861/2016 | 2/10/2021 | 2/9/2036 | R$9,758.01 | 6/1/2025 | Ativa | LT 500kV Itumbiara - São Simão - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 500 kV ITUMBIARA LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG | RB | FT LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 4/2/2019 | 9/11/2040 | R$455,130.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 500 kV ITUMBIARA LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG | RB | FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | EL 500 kV ITUMBIARA LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG | RB | FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 10/15/2014 | 10/14/2035 | R$38,486.04 | 6/1/2025 | Ativa | Substituição 3 para-raios no vão da LI Emborcação - Itumbiara - Nº Oper: PR9860T - PMI (005951/2015) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 500 kV ITUMBIARA LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG | RB | FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG | 062/2001 | IPCA | RBNI | REA 4347/2013 | 4/9/2018 | 4/8/2033 | R$12,221.19 | 6/1/2025 | Ativa | Substituição de RDP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 500 kV ITUMBIARA LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG | RB | FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG | 062/2001 | IPCA | RBNI | REA 8314/2019 | 7/9/2019 | 7/8/2034 | R$9,669.10 | 6/1/2025 | Ativa | LT 500kV Emborcação - Itumbiara - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 500 kV ITUMBIARA LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG | RB | FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/8/2019 | 12/10/2042 | R$593,797.02 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | RB | FT LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | RB | FT LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | 062/2001 | IPCA | RBNI | REA 2040/2009 | 4/30/2012 | 10/7/2034 | R$71,773.80 | 6/1/2025 | Ativa | Substituição de Bobina de Bloqueio e 3 TC *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | RB | FT LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | 062/2001 | IPCA | RBNI | REA 1814/2009 | 5/31/2012 | 12/23/2039 | R$148,152.63 | 6/1/2025 | Ativa | Substituição de 1 DJ na EL para Porto Colômbia *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | RB | FT LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | 062/2001 | IPCA | RBNI | REA 4068/2013 | 5/4/2016 | 11/25/2044 | R$34,575.00 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de entrada da LT 345 kV Itumbiara - Porto Colômbia: SC 8421 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | RB | FT LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | 062/2001 | IPCA | RBNI | REA 4068/2013 | 5/4/2016 | 11/25/2044 | R$34,575.00 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de entrada da LT 345 kV Itumbiara - Porto Colômbia: SC 8423 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | RB | FT LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | 062/2001 | IPCA | RBNI | REA 4068/2013 | 5/4/2016 | 11/25/2044 | R$34,575.00 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de entrada da LT 345 kV Itumbiara - Porto Colômbia: SC 8425 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | RB | FT LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | 062/2001 | IPCA | RBNI | REA 4068/2013 | 5/4/2016 | 11/25/2044 | R$50,108.70 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de entrada da LT 345 kV Itumbiara - Porto Colômbia: SC 8427 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | RB | FT LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | 062/2001 | IPCA | RBNI | REA 4068/2013 | 5/4/2016 | 11/25/2044 | R$34,575.00 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de entrada da LT 345 kV Itumbiara - Porto Colômbia: SC 8429 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | RB | FT LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | 062/2001 | IPCA | RBNI | REA 4347/2013 | 2/22/2017 | 6/16/2044 | R$4,771.31 | 6/1/2025 | Ativa | Substituição de RDP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | RB | FT LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 5/6/2014 | 11/29/2034 | R$26,484.81 | 6/1/2025 | Ativa | Substituição 3 para-raios no vão da LT Itumbiara - Porto Colömbia - Nº Oper: PR8420T - PMI (005958/2015) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | RB | FT LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 4/7/2014 | 8/7/2030 | R$100,357.05 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | 062/2001 | IPCA | RBNI | REA 1814/2009 | 3/5/2012 | 7/28/2039 | R$146,539.55 | 6/1/2025 | Ativa | Substituição de 1 DJ na EL para Bandeirantes II *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | 062/2001 | IPCA | RBNI | REA 4068/2013 | 11/22/2015 | 12/14/2043 | R$34,033.59 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de entrada da LT 345 kV Itumbiara - Bandeirantes C2: SC 8441 Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | 062/2001 | IPCA | RBNI | REA 4068/2013 | 11/24/2015 | 12/16/2043 | R$34,040.21 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de entrada da LT 345 kV Itumbiara - Bandeirantes C2: SC 8443 Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | 062/2001 | IPCA | RBNI | REA 4068/2013 | 11/23/2015 | 12/15/2043 | R$34,036.90 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de entrada da LT 345 kV Itumbiara - Bandeirantes C2: SC 8445 Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | 062/2001 | IPCA | RBNI | REA 4068/2013 | 11/23/2015 | 12/15/2043 | R$49,328.83 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de entrada da LT 345 kV Itumbiara - Bandeirantes C2: SC 8447 Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | 062/2001 | IPCA | RBNI | REA 4068/2013 | 11/28/2015 | 12/20/2043 | R$34,053.47 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de entrada da LT 345 kV Itumbiara - Bandeirantes C2: SC 8449 Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | 062/2001 | IPCA | RBNI | REA 4347/2013 | 2/22/2017 | 6/16/2044 | R$4,771.31 | 6/1/2025 | Ativa | Substituição de RDP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 5/25/2014 | 12/18/2034 | R$8,852.49 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARARAIOS LTIMBD2 USIT FASE A - Nº Oper: PR8440T - PMI (013088/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 5/25/2014 | 12/18/2034 | R$8,852.49 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARARAIOS LTIMBD2 USIT FASE B - Nº Oper: PR8440T - PMI (013089/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 5/25/2014 | 12/18/2034 | R$8,852.49 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARARAIOS LTIMBD2 USIT FASE C - Nº Oper: PR8440T - PMI (013090/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/28/2014 | 3/10/2032 | R$126,680.16 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO | 062/2001 | IPCA | RBNI | REA 4068/2013 | 12/5/2015 | 1/27/2044 | R$34,077.66 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de entrada da LT 345 kV Itumbiara - Bandeirantes C1: SC 8431 Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO | 062/2001 | IPCA | RBNI | REA 4068/2013 | 12/6/2015 | 1/28/2044 | R$34,080.97 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de entrada da LT 345 kV Itumbiara - Bandeirantes C1: SC 8433 Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO | 062/2001 | IPCA | RBNI | REA 4068/2013 | 12/7/2015 | 1/29/2044 | R$34,084.27 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de entrada da LT 345 kV Itumbiara - Bandeirantes C1: SC 8435 Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO | 062/2001 | IPCA | RBNI | REA 4068/2013 | 12/8/2015 | 1/30/2044 | R$49,402.29 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de entrada da LT 345 kV Itumbiara - Bandeirantes C1: SC 8437 Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO | 062/2001 | IPCA | RBNI | REA 4068/2013 | 12/9/2015 | 1/31/2044 | R$34,090.88 | 6/1/2025 | Ativa | Substituição de 01 chave seccionadora do módulo de entrada da LT 345 kV Itumbiara - Bandeirantes C1: SC 8439 Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO | 062/2001 | IPCA | RBNI | REA 4347/2013 | 2/22/2017 | 6/16/2044 | R$4,771.31 | 6/1/2025 | Ativa | Substituição de RDP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 5/5/2014 | 11/28/2034 | R$26,480.99 | 6/1/2025 | Ativa | Substituição 3 para-raios no vão da LT Itumbiara -Bandeirantes 1 - Nº Oper: PR8430T - PMI (005957/2015) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/28/2014 | 12/8/2032 | R$143,080.77 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG | RB | FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG | RB | FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,229,990.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG | RB | FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,318,615.67 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG | RB | FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG | 062/2001 | IPCA | RBNI | REA 4347/2013 | 2/22/2017 | 6/16/2044 | R$4,771.31 | 6/1/2025 | Ativa | Substituição de RDP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 345 kV ITUMBIARA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG | RB | FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG | 062/2001 | IPCA | RBNI | REA 5861/2016 | 1/21/2021 | 3/11/2036 | R$182,067.91 | 6/1/2025 | Ativa | LT 345 kV Itumbiara - Corumbá: Revitalização do Sistema de Proteção, Supervisão e circuitos secundários de corrente, potencial e controle. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 230 kV ITUMBIARA LT 230 kV PARANAIBA /ITUMBIARA C-1 GO/MG | RB | FT LT 230 kV PARANAIBA /ITUMBIARA C-1 GO/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$215,593.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | EL 230 kV ITUMBIARA LT 230 kV PARANAIBA /ITUMBIARA C-1 GO/MG | RB | FT LT 230 kV PARANAIBA /ITUMBIARA C-1 GO/MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$827,315.35 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO | RB | FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$215,593.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO | RB | FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$827,315.35 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO | RB | FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2018 | 1/4/2048 | R$94,660.16 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO | RB | FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$215,593.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO | RB | FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO | 062/2001 | IPCA | RBNI | REA 1814/2009 | 5/14/2012 | 12/6/2039 | R$104,068.28 | 6/1/2025 | Ativa | Substituição de 1 DJ no vão da EL Rio Verde I *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO | RB | FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO | 062/2001 | IPCA | RMEL | REN 643/2014 | 1/31/2015 | 5/26/2036 | R$18,799.75 | 6/1/2025 | Ativa | Substituição 3 para-raios no vão da LT Itumbiara - Rio Verde 1 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO | RB | FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$215,593.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO | RB | FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO | 062/2001 | IPCA | RBNI | REA 1814/2009 | 7/10/2012 | 4/2/2040 | R$104,838.24 | 6/1/2025 | Ativa | Substituição de 1 DJ no vão da EL Cachoeira Dourada *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO | RB | FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO | 062/2001 | IPCA | RMEL | REN 643/2014 | 1/30/2016 | 4/24/2038 | R$19,720.17 | 6/1/2025 | Ativa | Substituição 3 para-raios no vão da LT Itumbiara - Cachoeira Dourada * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUMBIARA | EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO | RB | FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/4/2021 | 3/3/2036 | R$38,753.57 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITUMBIARA | CR 230 kV 33,9 Mvar ITUMBIARA BC1 MG | RB | FT CR 230 kV 33,9 Mvar ITUMBIARA BC1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$176,472.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUMBIARA | CR 230 kV 183 Mvar ITUMBIARA BC2 MG | RB | FT CR 230 kV 183 Mvar ITUMBIARA BC2 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$492,760.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUTINGA | RTB 345 kV 60 Mvar ITUTINGA RT1 MG | RB | FT RTB 345 kV 60 Mvar ITUTINGA RT1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$473,185.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUTINGA | RTB 345 kV 33,33 Mvar ITUTINGA RB2R MG | RB | FT RTB 345 kV 33,33 Mvar ITUTINGA RB2R MG | 062/2001 | IPCA | RBNI | REA 5952/2016 | 8/1/2019 | 9/7/2053 | R$540,207.74 | 6/1/2025 | Ativa | T2016-042 | Instalação da fase reserva do reator de barras 345 kV, 33,3 Mvar, na SE Itutinga *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | ITUTINGA | RTB 345 kV 20 Mvar ITUTINGA RTR1 MG | RB | FT RTB 345 kV 20 MVAr ITUTINGA RTR1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$157,728.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUTINGA | RTB 345 kV 100 Mvar ITUTINGA RB2 MG | RB | FT RTB 345 kV 100 Mvar ITUTINGA RB2 MG | 062/2001 | IPCA | RBNI | REA 5952/2016 | 8/1/2019 | 9/7/2053 | R$ 1,620,623.21 | 6/1/2025 | Ativa | T2016-042 | Instalação de um banco de reatores monofásicos (3+1) x 33,3 Mvar, no barramento de 345 kV da SE Itutinga *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | ITUTINGA | MG 345 kV ITUTINGA MG1 MG | RB | FT MG 345 kV ITUTINGA MG1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$741,640.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUTINGA | MG 345 kV ITUTINGA MG1 MG | RB | FT MG 345 kV ITUTINGA MG1 MG | 062/2001 | IPCA | RBNI | REA 5952/2016 | 8/1/2019 | 3/31/2047 | R$75,006.77 | 6/1/2025 | Ativa | T2016-042 | Complementação do módulo geral da SE Itutinga com um módulo de manobra para instalação do segundo banco de reatores de barra, (3+1) x 33,3 Mvar, 345 kV *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | ITUTINGA | MG 345 kV ITUTINGA MG1 MG | RB | FT MG 345 kV ITUTINGA MG1 MG | 062/2001 | IPCA | RBNI | REA 5952/2016 | 8/1/2019 | 7/31/2034 | R$65,344.63 | 6/1/2025 | Ativa | T2016-042 | Complementação do módulo geral da SE Itutinga por superação do sistema de telecomunicações, para instalação do segundo banco de reatores de barra, (3+1) x 33,3 Mvar, 345 kV *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | ITUTINGA | MG 345 kV ITUTINGA MG1 MG | RB | FT MG 345 kV ITUTINGA MG1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 7/5/2016 | 4/1/2030 | R$7,092.71 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (004278/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | MG 345 kV ITUTINGA MG1 MG | RB | FT MG 345 kV ITUTINGA MG1 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/18/2017 | 11/21/2042 | R$461,264.55 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITUTINGA | MC 345 kV RTB 345 kV 60 Mvar ITUTINGA RT1 MG | RB | FT RTB 345 kV 60 Mvar ITUTINGA RT1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,369.82 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUTINGA | MC 345 kV RTB 345 kV 60 Mvar ITUTINGA RT1 MG | RB | FT RTB 345 kV 60 Mvar ITUTINGA RT1 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/31/2015 | 5/30/2043 | R$5,010.94 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITUTINGA | MC 345 kV RTB 345 kV 100 Mvar ITUTINGA RB2 MG | RB | FT RTB 345 kV 100 Mvar ITUTINGA RB2 MG | 062/2001 | IPCA | RBNI | REA 5952/2016 | 8/1/2019 | 12/8/2048 | R$ 1,602,739.10 | 6/1/2025 | Ativa | T2016-042 | Instalação da conexão do segundo reator de barra 345 kV, configuração barra dupla cinco chaves, na SE Itutinga *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | ITUTINGA | IB 345 kV MG 345 kV ITUTINGA MG1 MG IB1 | RB | FT MG 345 kV ITUTINGA MG1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUTINGA | IB 345 kV MG 345 kV ITUTINGA MG1 MG IB1 | RB | FT MG 345 kV ITUTINGA MG1 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$928,957.53 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUTINGA | IB 345 kV MG 345 kV ITUTINGA MG1 MG IB1 | RB | FT MG 345 kV ITUTINGA MG1 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$995,892.20 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUTINGA | IB 345 kV MG 345 kV ITUTINGA MG1 MG IB1 | RB | FT MG 345 kV ITUTINGA MG1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 2/23/2017 | 6/17/2046 | R$32,277.83 | 6/1/2025 | Ativa | Substituição da SC801 (Amarre) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | IB 345 kV MG 345 kV ITUTINGA MG1 MG IB1 | RB | FT MG 345 kV ITUTINGA MG1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 2/24/2017 | 6/18/2046 | R$32,280.72 | 6/1/2025 | Ativa | Substituição da SC803 (Amarre) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | IB 345 kV MG 345 kV ITUTINGA MG1 MG IB1 | RB | FT MG 345 kV ITUTINGA MG1 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 2/14/2017 | 4/9/2049 | R$338,428.51 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV VARGINHA 4 /ITUTINGA C-1 MG | RB | FT LT 345 kV VARGINHA 4 /ITUTINGA C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV VARGINHA 4 /ITUTINGA C-1 MG | RB | FT LT 345 kV VARGINHA 4 /ITUTINGA C-1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 2/20/2017 | 6/14/2046 | R$32,568.96 | 6/1/2025 | Ativa | Substituição de SECIONADOR SC8123 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV VARGINHA 4 /ITUTINGA C-1 MG | RB | FT LT 345 kV VARGINHA 4 /ITUTINGA C-1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 2/20/2017 | 6/14/2046 | R$32,568.96 | 6/1/2025 | Ativa | Substituição de SECIONADOR SC8125 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV VARGINHA 4 /ITUTINGA C-1 MG | RB | FT LT 345 kV VARGINHA 4 /ITUTINGA C-1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 2/20/2017 | 6/14/2046 | R$32,568.96 | 6/1/2025 | Ativa | Substituição de SECIONADOR SC8129 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV VARGINHA 4 /ITUTINGA C-1 MG | RB | FT LT 345 kV VARGINHA 4 /ITUTINGA C-1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 2/20/2017 | 6/15/2040 | R$9,869.39 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR8120T LTFUIT02 STIT FASE A * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV VARGINHA 4 /ITUTINGA C-1 MG | RB | FT LT 345 kV VARGINHA 4 /ITUTINGA C-1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 2/20/2017 | 6/15/2040 | R$9,869.39 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR8120T LTFUIT02 STIT FASE B * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV VARGINHA 4 /ITUTINGA C-1 MG | RB | FT LT 345 kV VARGINHA 4 /ITUTINGA C-1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 2/20/2017 | 6/15/2040 | R$9,869.39 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR8120T LTFUIT02 STIT FASE C * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV VARGINHA 4 /ITUTINGA C-1 MG | RB | FT LT 345 kV VARGINHA 4 /ITUTINGA C-1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 2/20/2017 | 6/14/2046 | R$32,568.96 | 6/1/2025 | Ativa | Substituição da SC8121 (LT Furnas - Itutinga circ 2) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV VARGINHA 4 /ITUTINGA C-1 MG | RB | FT LT 345 kV VARGINHA 4 /ITUTINGA C-1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 2/20/2017 | 6/14/2046 | R$47,201.38 | 6/1/2025 | Ativa | Substituição da SC8127/8120T (LT Furnas - Itutinga circ 2) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV VARGINHA 4 /ITUTINGA C-1 MG | RB | FT LT 345 kV VARGINHA 4 /ITUTINGA C-1 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/21/2017 | 8/9/2049 | R$323,333.59 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG | RB | FT LT 345 kV FURNAS /ITUTINGA C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG | RB | FT LT 345 kV FURNAS /ITUTINGA C-1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/26/2017 | 8/17/2046 | R$32,664.89 | 6/1/2025 | Ativa | Substituição de SECIONADOR SC8113 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG | RB | FT LT 345 kV FURNAS /ITUTINGA C-1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/26/2017 | 8/17/2046 | R$32,664.89 | 6/1/2025 | Ativa | Substituição de SECIONADOR SC8115 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG | RB | FT LT 345 kV FURNAS /ITUTINGA C-1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/26/2017 | 8/18/2040 | R$9,905.36 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR8110T LTFUIT1 STIT FASE A * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG | RB | FT LT 345 kV FURNAS /ITUTINGA C-1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/26/2017 | 8/18/2040 | R$9,905.36 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR8110T LTFUIT1 STIT FASE B * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG | RB | FT LT 345 kV FURNAS /ITUTINGA C-1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/26/2017 | 8/18/2040 | R$9,905.36 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR8110T LTFUIT1 STIT FASE C * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG | RB | FT LT 345 kV FURNAS /ITUTINGA C-1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 4/27/2017 | 10/19/2046 | R$32,754.50 | 6/1/2025 | Ativa | Substituição de SECIONADOR SC8119 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG | RB | FT LT 345 kV FURNAS /ITUTINGA C-1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/26/2017 | 8/17/2046 | R$32,664.89 | 6/1/2025 | Ativa | Substituição da SC8111 (LT Furnas - Itutinga circ 1) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG | RB | FT LT 345 kV FURNAS /ITUTINGA C-1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/26/2017 | 8/17/2046 | R$47,340.43 | 6/1/2025 | Ativa | Substituição da SC8117/8110T (LT Furnas - Itutinga circ 1) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG | RB | FT LT 345 kV FURNAS /ITUTINGA C-1 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/21/2017 | 8/9/2049 | R$323,333.59 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 4/9/2017 | 10/2/2040 | R$9,919.20 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR8140T LTADIT2 STIT FASE A * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 4/9/2017 | 10/2/2040 | R$9,919.20 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR8140T LTADIT2 STIT FASE B * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 4/9/2017 | 10/2/2040 | R$9,919.20 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR8140T LTADIT2 STIT FASE C * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 4/9/2017 | 10/1/2046 | R$32,702.36 | 6/1/2025 | Ativa | Substituição de secionador 8141 do vão de 345 kV para Adrianópolis C2 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 4/9/2017 | 10/1/2046 | R$32,702.36 | 6/1/2025 | Ativa | Substituição de secionador 8143 do vão de 345 kV para Adrianópolis C2 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 4/9/2017 | 10/1/2046 | R$32,702.36 | 6/1/2025 | Ativa | Substituição de secionador 8145 do vão de 345 kV para Adrianópolis C2 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 4/9/2017 | 10/1/2046 | R$32,702.36 | 6/1/2025 | Ativa | Substituição de secionador 8149 do vão de 345 kV para Adrianópolis C2 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 4/29/2017 | 10/21/2046 | R$47,478.69 | 6/1/2025 | Ativa | Substituição de secionador 8147 com lâmina de terra (8140T) do vão de 345 kV para Adrianópolis C2 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/31/2015 | 5/30/2043 | R$15,094.93 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/12/2017 | 8/4/2040 | R$9,889.99 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR8130T LTADIT1 STIT FASE A * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/12/2017 | 8/4/2040 | R$9,889.99 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR8130T LTADIT1 STIT FASE B * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/12/2017 | 8/4/2040 | R$9,889.99 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR8130T LTADIT1 STIT FASE C * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/12/2017 | 8/3/2046 | R$32,624.22 | 6/1/2025 | Ativa | Substituição de secionador 8131 do vão de 345 kV para Adrianópolis C1 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/12/2017 | 8/3/2046 | R$32,624.22 | 6/1/2025 | Ativa | Substituição de secionador 8133 do vão de 345 kV para Adrianópolis C1 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/12/2017 | 8/3/2046 | R$32,624.22 | 6/1/2025 | Ativa | Substituição de secionador 8135 do vão de 345 kV para Adrianópolis C1 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/12/2017 | 8/3/2046 | R$32,624.22 | 6/1/2025 | Ativa | Substituição de secionador 8139 do vão de 345 kV para Adrianópolis C1 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/12/2017 | 8/3/2046 | R$47,281.48 | 6/1/2025 | Ativa | Substituição de secionador 8137 com lâmina de terra (8130T) do vão de 345 kV para Adrianópolis C1 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | ITUTINGA | EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/31/2015 | 5/30/2043 | R$15,094.93 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | TT 69/0,24 kV IVAIPORA AT03 PR | RB | FT TR 750/500 kV IVAIPORA TR3 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | TT 69/0,24 kV IVAIPORA AT02 PR | RB | FT TR 750/500 kV IVAIPORA TR2 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | TT 69/0,24 kV IVAIPORA AT01 PR | RB | FT TR 750/500 kV IVAIPORA TR1 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | TR 750/500 kV IVAIPORA TRR1 PR | RB | FT TR 750/500 kV IVAIPORA TRR1 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$944,173.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | TR 750/500 kV IVAIPORA TRR1 PR | RB | FT TR 750/500 kV IVAIPORA TRR1 PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,623,150.12 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | TR 750/500 kV IVAIPORA TRR1 PR | RB | FT TR 750/500 kV IVAIPORA TRR1 PR | 062/2001 | IPCA | RMELP | DSP 1108/2024 | R$ 3,623,089.14 | 6/1/2025 | Prevista | T2024-091 | Obra de Substituição Completa: Substituição de trafo potencia AT129V - AUTOTRAFO RESERVA, na SE IVAIPORA FUR. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia | IVAIPORA | TR 750/500 kV IVAIPORA TRR1 PR | RB | FT TR 750/500 kV IVAIPORA TRR1 PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/18/2022 | 8/19/2048 | R$75,242.19 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | TR 750/500 kV IVAIPORA TR3 PR | RB | FT TR 750/500 kV IVAIPORA TR3 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,832,520.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | TR 750/500 kV IVAIPORA TR2 PR | RB | FT TR 750/500 kV IVAIPORA TR2 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,832,520.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | TR 750/500 kV IVAIPORA TR2 PR | RB | FT TR 750/500 kV IVAIPORA TR2 PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 10,869,450.38 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | TR 750/500 kV IVAIPORA TR2 PR | RB | FT TR 750/500 kV IVAIPORA TR2 PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 11,652,632.67 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | TR 750/500 kV IVAIPORA TR2 PR | RB | FT TR 750/500 kV IVAIPORA TR2 PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/21/2021 | 5/6/2047 | R$241,391.35 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | TR 750/500 kV IVAIPORA TR1 PR | RB | FT TR 750/500 kV IVAIPORA TR1 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,832,520.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | TR 750/500 kV IVAIPORA TR1 PR | RB | FT TR 750/500 kV IVAIPORA TR1 PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 10,869,450.38 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | TR 750/500 kV IVAIPORA TR1 PR | RB | FT TR 750/500 kV IVAIPORA TR1 PR | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/7/2017 | 7/30/2040 | R$2,158.16 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARARAIOS DA BARRA DE 69KV AT01 FASE A * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | TR 750/500 kV IVAIPORA TR1 PR | RB | FT TR 750/500 kV IVAIPORA TR1 PR | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/7/2017 | 7/30/2040 | R$2,158.16 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARARAIOS DA BARRA DE 69KV AT01 FASE B * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | TR 750/500 kV IVAIPORA TR1 PR | RB | FT TR 750/500 kV IVAIPORA TR1 PR | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/7/2017 | 7/30/2040 | R$2,158.16 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARARAIOS DA BARRA DE 69KV AT01 FASE C * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | TR 750/500 kV IVAIPORA TR1 PR | RB | FT TR 750/500 kV IVAIPORA TR1 PR | 062/2001 | IPCA | RMELP | REA 15273/2024 | R$ 7,250,114.63 | 6/1/2025 | Prevista | T2024-078 | Obra de Substituição Parcial: Substituição de trafo potencia AT01 FASE A (nº serie: GM99910, cod. mat.: 10182541). As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia | IVAIPORA | TR 750/500 kV IVAIPORA TR1 PR | RB | FT TR 750/500 kV IVAIPORA TR1 PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/18/2016 | 1/20/2046 | R$38,828.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | TR 500/69 kV IVAIPORA TREGR1 PR | RB | FT TR 750/500 kV IVAIPORA TRR1 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$707,101.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | TR 500/69 kV IVAIPORA TREGR1 PR | RB | FT TR 750/500 kV IVAIPORA TRR1 PR | 062/2001 | IPCA | RMELP | DSP 1108/2024 | R$ 4,573,077.10 | 6/1/2025 | Prevista | T2024-082 | Obra de Substituição Completa: Substituição de trafo potencia TRRG09V (nº serie: SPT-12190, cod. mat.: 10183704). As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia | IVAIPORA | TR 500/69 kV IVAIPORA TREG3 PR | RB | FT TR 750/500 kV IVAIPORA TR3 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,121,305.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | TR 500/69 kV IVAIPORA TREG2 PR | RB | FT TR 750/500 kV IVAIPORA TR2 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,121,305.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | TR 500/69 kV IVAIPORA TREG1 PR | RB | FT TR 750/500 kV IVAIPORA TR1 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,121,305.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | TR 500/69 kV IVAIPORA TREG1 PR | RB | FT TR 750/500 kV IVAIPORA TR1 PR | 062/2001 | IPCA | RMELP | REA 15480/2024 | R$ 14,750,928.44 | 6/1/2025 | Prevista | T2024-190 | Obra de Substituição Completa: Substituição de trafo potencia TRRG01 FASE A (nº serie: GM99912, cod. mat.: 10183703),FASE B (nº serie: SPT-12192, cod. mat.: 10183705), e FASE C (nº serie: GM99913, cod. mat.: 10183706) na SE IVAIPORA FUR. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia | IVAIPORA | RTL 750 kV 50 Mvar IVAIPORA RTR2 PR | RB | FT RTL 750 kV 50 Mvar IVAIPORA RTR2 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$246,212.24 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTL 750 kV 330 Mvar IVAIPORA RIA2 PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$994,138.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTL 750 kV 330 Mvar IVAIPORA RIA2 PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,814,883.14 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTL 750 kV 330 Mvar IVAIPORA RIA2 PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | 062/2001 | IPCA | RMEL | REA 11449/2022 | 4/11/2025 | 4/10/2061 | R$ 1,260,074.65 | 6/1/2025 | Ativa | T2022-007 | Obra de Substituição Parcial - Substituir na SE Ivaiporã a fase A do reator monofásico - RIA2 - 750 kV - 1x110 MVAr por outra fase A de 1x110 MVAr. Parcela de RAP referente à troca da fase A do reator RIA2. Não excluir a receita de O&M antiga até a entrada das três fases do equipamento. | ||
| AXIA Energia | IVAIPORA | RTL 750 kV 330 Mvar IVAIPORA RIA2 PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | 062/2001 | IPCA | RMEL | REA 11449/2022 | 5/4/2022 | 4/13/2058 | R$ 1,423,194.01 | 6/1/2025 | Ativa | T2022-025 | Obra de Substituição Parcial - Substituir na SE Ivaiporã a fase C do reator monofásico - RIA2 - 750 kV - 1x110 MVAr por outra fase C de 1x110 MVAr. Parcela de RAP referente à troca da fase C do reator RIA2. Não excluir a receita de O&M antiga até a entrada das três fases do equipamento. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | IVAIPORA | RTL 750 kV 330 Mvar IVAIPORA RIA2 PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 2/17/2019 | 12/15/2050 | R$370,170.20 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | RTL 750 kV 329 Mvar IVAIPORA RIA3 PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$994,138.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTL 750 kV 329 Mvar IVAIPORA RIA3 PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,814,883.14 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTL 750 kV 329 Mvar IVAIPORA RIA3 PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/11/2023 | 6/19/2047 | R$118,982.14 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | RTL 750 kV 329 Mvar IVAIPORA RIA1 PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$994,138.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTL 750 kV 329 Mvar IVAIPORA RIA1 PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,814,883.14 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTL 750 kV 329 Mvar IVAIPORA RIA1 PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | 062/2001 | IPCA | RMELP | REA 11449/2022 | R$ 2,520,149.34 | 6/1/2025 | Prevista | T2022-006 | Obra de Substituição Parcial - Substituir na SE Ivaiporã a fase B e C do reator monofásico - RIA1 - 750 kV - 2x110 MVA por outra fase B e C de 2x110 MVA. Parcela de RAP referente à troca da fase B e C do reator RIA1. Não excluir a receita de O&M antiga até a entrada das três fases do equipamento. | 4T25 | |||
| AXIA Energia | IVAIPORA | RTL 750 kV 329 Mvar IVAIPORA RIA1 PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/3/2022 | 1/14/2049 | R$181,649.62 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | RTL 750 kV 150 Mvar IVAIPORA RFI3 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$357,802.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | RTL 750 kV 150 Mvar IVAIPORA RFI3 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,373,024.13 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | RTL 750 kV 150 Mvar IVAIPORA RFI3 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,471,955.37 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | RTL 750 kV 150 Mvar IVAIPORA RFI3 PR | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/22/2023 | 6/28/2047 | R$119,016.55 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | IVAIPORA | RTL 750 kV 150 Mvar IVAIPORA RFI2 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$357,802.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | RTL 750 kV 150 Mvar IVAIPORA RFI2 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,373,024.13 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | RTL 750 kV 150 Mvar IVAIPORA RFI2 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,471,955.37 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | RTL 750 kV 150 Mvar IVAIPORA RFI2 PR | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/23/2023 | 6/29/2047 | R$119,082.42 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | IVAIPORA | RTL 750 kV 150 Mvar IVAIPORA RFI1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$357,802.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | RTL 750 kV 150 Mvar IVAIPORA RFI1 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,373,024.13 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | RTL 750 kV 150 Mvar IVAIPORA RFI1 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,471,955.37 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | RTL 750 kV 150 Mvar IVAIPORA RFI1 PR | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/28/2022 | 5/6/2047 | R$118,539.38 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | IVAIPORA | RTL 750 kV 110 Mvar IVAIPORA RTR3 PR | RB | FT RTL 750 kV 110 Mvar IVAIPORA RTR3 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$331,379.39 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTL 750 kV 110 Mvar IVAIPORA RTR1 PR | RB | FT RTL 750 kV 110 Mvar IVAIPORA RTR1 PR | 062/2001 | IPCA | RMEL | REA 12637/2022 | 11/26/2024 | 11/25/2060 | R$ 1,460,805.09 | 6/1/2025 | Ativa | T2022-105 | Obra de Substituição Completa - Substituição, na SE IVAIPORA, de um reator de Linha Monofásico RTR1 750 kV - 110 Mvar por outro de mesma potência. | ||
| AXIA Energia | IVAIPORA | RTL 750 kV 110 Mvar IVAIPORA RTR1 PR | RB | FT RTL 750 kV 110 Mvar IVAIPORA RTR1 PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/16/2022 | 8/12/2048 | R$89,589.47 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | IVAIPORA | RTL 500 kV 100 Mvar IVAIPORA RT1 PR | RB | FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR | 004/2004 | IGPM | RBL | CC 004/2004 | 10/31/2005 | 2/18/2034 | R$ 2,809,933.00 | 6/1/2025 | Ativa | Contrato de Concessão nº 004/2004 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | IVAIPORA | RTL 500 kV 100 Mvar IVAIPORA RT1 PR | RB | FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR | 004/2004 | IGPM | RMEL | REN 643/2014 | 8/12/2015 | 8/10/2051 | R$ 952.39 | 6/1/2025 | Ativa | Substituição das flexitestes dos circuitos STIV 1, 2 e 3, Cascavel Oeste, Salto Santiago 1 e 2 e Londrina 1 e 2 e do reator 1 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | |||
| AXIA Energia | IVAIPORA | RTB 750 kV 330 Mvar IVAIPORA RT8 PR | RB | FT RTB 750 kV 330 Mvar IVAIPORA RT8 PR | 062/2001 | IPCA | RBNIA | REA 15073/2024 | R$ 3,882,692.24 | 6/1/2025 | Prevista | T2023-166 | Instalação do 2º banco de reatores de barra 765 kV - 3x110 Mvar | ||||
| AXIA Energia | IVAIPORA | RTB 750 kV 329 Mvar IVAIPORA RT7 PR | RB | FT RTB 750 kV 329 Mvar IVAIPORA RT7 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$994,138.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTB 750 kV 329 Mvar IVAIPORA RT7 PR | RB | FT RTB 750 kV 329 Mvar IVAIPORA RT7 PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,814,883.14 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTB 750 kV 329 Mvar IVAIPORA RT7 PR | RB | FT RTB 750 kV 329 Mvar IVAIPORA RT7 PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 4,089,758.95 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTB 750 kV 110 Mvar IVAIPORA RTR2 PR | RB | FT RTB 750 kV 110 Mvar IVAIPORA RTR2 PR | 062/2001 | IPCA | RBNIA | REA 15073/2024 | R$ 1,294,230.75 | 6/1/2025 | Prevista | T2023-166-A | Instalação de uma fase reserva para o 2º banco de reatores de barra 765 kV - 110 Mvar, na SE Ivaiporã. | ||||
| AXIA Energia | IVAIPORA | RTB 69 kV 60 Mvar IVAIPORA RTR1 PR | RB | FT RTB 69 kV 60 Mvar IVAIPORA RTR1 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$182,137.97 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTB 69 kV 60 Mvar IVAIPORA RTR1 PR | RB | FT RTB 69 kV 60 Mvar IVAIPORA RTR1 PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/8/2022 | 9/1/2051 | R$18,091.59 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | RTB 69 kV 180 Mvar IVAIPORA RT3B PR | RB | FT RTB 69 kV 180 Mvar IVAIPORA RT3B PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$209,758.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTB 69 kV 180 Mvar IVAIPORA RT3A PR | RB | FT RTB 69 kV 180 Mvar IVAIPORA RT3A PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$209,758.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTB 69 kV 180 Mvar IVAIPORA RT2C PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT2C PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$209,758.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTB 69 kV 180 Mvar IVAIPORA RT2C PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT2C PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$804,921.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTB 69 kV 180 Mvar IVAIPORA RT2C PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT2C PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$862,919.33 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTB 69 kV 180 Mvar IVAIPORA RT2B PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT2B PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$209,758.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTB 69 kV 180 Mvar IVAIPORA RT2B PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT2B PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$804,921.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTB 69 kV 180 Mvar IVAIPORA RT2B PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT2B PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$862,919.33 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTB 69 kV 180 Mvar IVAIPORA RT2A PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT2A PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$209,758.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 |
| Revenue Concessionaire | Edification | Module | Classification | Transmission Function | Revenue Contract | Index | Revenue Type | RAP Act | Start | End | 2025/2026 RAP Cycle | RAP Reference Date | RAP Situation | Project | Revenue Description | Quarter | Obs |
| AXIA Energia | IVAIPORA | RTB 69 kV 180 Mvar IVAIPORA RT2A PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT2A PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$804,921.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTB 69 kV 180 Mvar IVAIPORA RT2A PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT2A PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$862,919.33 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTB 69 kV 180 Mvar IVAIPORA RT1C PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$209,758.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTB 69 kV 180 Mvar IVAIPORA RT1C PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$804,921.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTB 69 kV 180 Mvar IVAIPORA RT1C PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR | 062/2001 | IPCA | RMELP | DSP 1108/2024 | R$811,044.96 | 6/1/2025 | Prevista | T2024-086 | Obra de Substituição Completa: Substituição de reator RT1C FASE A, B e C, na SE IVAIPORA FUR. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia | IVAIPORA | RTB 69 kV 180 Mvar IVAIPORA RT1B PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$209,758.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTB 69 kV 180 Mvar IVAIPORA RT1B PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$804,921.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTB 69 kV 180 Mvar IVAIPORA RT1B PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR | 062/2001 | IPCA | RMELP | DSP 1108/2024 | R$811,044.96 | 6/1/2025 | Prevista | T2024-083 | Obra de Substituição Completa: Substituição de reator RT1B FASE A, B e C, na SE IVAIPORA FUR. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia | IVAIPORA | RTB 69 kV 180 Mvar IVAIPORA RT1A PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$209,758.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTB 69 kV 180 Mvar IVAIPORA RT1A PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$804,921.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | RTB 69 kV 180 Mvar IVAIPORA RT1A PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR | 062/2001 | IPCA | RMELP | DSP 1108/2024 | R$811,044.96 | 6/1/2025 | Prevista | T2024-079 | Obra de Substituição Completa: Substituição de reator RT1A FASE A (nº serie: 57712, cod. mat.: 10183991). As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia | IVAIPORA | MG 750 kV IVAIPORA MG1 PR | RB | FT MG 750 kV IVAIPORA MG1 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,533,284.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MG 750 kV IVAIPORA MG1 PR | RB | FT MG 750 kV IVAIPORA MG1 PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 5,883,789.61 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MG 750 kV IVAIPORA MG1 PR | RB | FT MG 750 kV IVAIPORA MG1 PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 6,307,737.43 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MG 750 kV IVAIPORA MG1 PR | RB | FT MG 750 kV IVAIPORA MG1 PR | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/31/2017 | 3/27/2033 | R$ 647.02 | 6/1/2025 | Ativa | Substituição de IHMs do Sistema de Supervisão e Controle Local (SAGE) por obsolescência ou por atualização tecnológica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MG 750 kV IVAIPORA MG1 PR | RB | FT MG 750 kV IVAIPORA MG1 PR | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/16/2015 | 12/11/2028 | R$6,718.04 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (002364/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MG 750 kV IVAIPORA MG1 PR | RB | FT MG 750 kV IVAIPORA MG1 PR | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/16/2015 | 12/11/2028 | R$6,718.04 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (003838/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MG 750 kV IVAIPORA MG1 PR | RB | FT MG 750 kV IVAIPORA MG1 PR | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/16/2015 | 12/11/2028 | R$6,718.04 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (010369/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MG 750 kV IVAIPORA MG1 PR | RB | FT MG 750 kV IVAIPORA MG1 PR | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/16/2015 | 12/11/2028 | R$6,718.04 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (003240/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MG 750 kV IVAIPORA MG1 PR | RB | FT MG 750 kV IVAIPORA MG1 PR | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/16/2015 | 12/11/2028 | R$26,247.11 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (004279/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MG 750 kV IVAIPORA MG1 PR | RB | FT MG 750 kV IVAIPORA MG1 PR | 062/2001 | IPCA | RBNI | REA 8314/2019 | 7/9/2019 | 7/8/2034 | R$14,913.81 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000432/2014. (FT: LT 765 kV FOZ DO IGUAÇU / IVAIPORA FURC 1 PR) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MG 750 kV IVAIPORA MG1 PR | RB | FT MG 750 kV IVAIPORA MG1 PR | 062/2001 | IPCA | RBNI | REA 8314/2019 | 7/9/2019 | 7/8/2034 | R$14,913.81 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000440/2014. (FT: LT 765 kV FOZ DO IGUAÇU / IVAIPORA FUR C 2 PR) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MG 750 kV IVAIPORA MG1 PR | RB | FT MG 750 kV IVAIPORA MG1 PR | 062/2001 | IPCA | RBNI | REA 8314/2019 | 7/9/2019 | 7/8/2034 | R$14,913.81 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000424/2014. (FT: LT 765 kV FOZ DO IGUAÇU / IVAIPORA FUR C 3 PR) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MG 750 kV IVAIPORA MG1 PR | RB | FT MG 750 kV IVAIPORA MG1 PR | 062/2001 | IPCA | RBNI | REA 8314/2019 | 7/9/2019 | 7/8/2034 | R$14,913.81 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000442/2014. (FT: LT 765 kV ITABERA / IVAIPORA FUR C 1 SP/PR) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MG 750 kV IVAIPORA MG1 PR | RB | FT MG 750 kV IVAIPORA MG1 PR | 062/2001 | IPCA | RBNI | REA 8314/2019 | 7/9/2019 | 7/8/2034 | R$14,913.81 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000416/2014. (FT: LT 765 kV ITABERA / IVAIPORA FUR C 2 SP/PR) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MG 750 kV IVAIPORA MG1 PR | RB | FT MG 750 kV IVAIPORA MG1 PR | 062/2001 | IPCA | RBNI | REA 8314/2019 | 7/9/2019 | 7/8/2034 | R$14,913.81 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000450/2014. (LT 765 kV ITABERA / IVAIPORA FUR C 3 SP/PR) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MG 750 kV IVAIPORA MG1 PR | RB | FT MG 750 kV IVAIPORA MG1 PR | 062/2001 | IPCA | RBNI | REA 8314/2019 | 7/9/2019 | 7/8/2034 | R$26,143.33 | 6/1/2025 | Ativa | Implantação de Unidade de Medição Fasorial – PMU e sistema de comunicação associado adicional para transmissão das medidas para o ONS, na barra da subestação. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MG 750 kV IVAIPORA MG1 PR | RB | FT MG 750 kV IVAIPORA MG1 PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 2/11/2021 | 10/20/2042 | R$ 1,196,692.79 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | IVAIPORA | MG 500 kV IVAIPORA MG1 PR | RB | FT MG 500 kV IVAIPORA MG1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,626,957.93 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | IVAIPORA | MG 500 kV IVAIPORA MG1 PR | RB | FT MG 500 kV IVAIPORA MG1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,855,444.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | IVAIPORA | MG 500 kV IVAIPORA MG1 PR | RB | FT MG 500 kV IVAIPORA MG1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,418,611.53 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | IVAIPORA | MG 500 kV IVAIPORA MG1 PR | RB | FT MG 500 kV IVAIPORA MG1 PR | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 2/23/2041 | R$193,757.51 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Ivaiporã 1, 2 e 3, Londrina 1, Salto Santiago 1 e 2. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | IVAIPORA | MG 500 kV IVAIPORA MG1 PR | RB | FT MG 500 kV IVAIPORA MG1 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 10/31/2022 | 10/30/2037 | R$4,363.92 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | IVAIPORA | MG 500 kV IVAIPORA MG1 PR | RB | FT MG 500 kV IVAIPORA MG1 PR | 057/2001 | IPCA | RBNI | DSP 4033/2021 | 4/17/2020 | 4/16/2035 | R$55,566.13 | 6/1/2025 | Ativa | Instalação de equipamento com função PMU (solução distribuída), especificamente o Módulo Concentrador de Informações, associado ao Módulo Geral da SE Ivaiporã.. Implantação do projeto de medição fasorial do SIN. Complementação da descrição da obra contida na REA 6.630/2017 (SGPMR - 000302/2014 SGPMI - 000476/2014). Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 750 kV TR 750/500 kV IVAIPORA TR3 PR | RB | FT TR 750/500 kV IVAIPORA TR3 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$622,784.52 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 750 kV TR 750/500 kV IVAIPORA TR3 PR | RB | FT TR 750/500 kV IVAIPORA TR3 PR | 062/2001 | IPCA | RMEL | REN 643/2014 | 12/2/2016 | 12/24/2045 | R$24,468.34 | 6/1/2025 | Ativa | Substituição de 1 seccionadora (SC 12733) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 750 kV TR 750/500 kV IVAIPORA TR3 PR | RB | FT TR 750/500 kV IVAIPORA TR3 PR | 062/2001 | IPCA | RMEL | REN 643/2014 | 12/9/2016 | 1/31/2046 | R$24,452.84 | 6/1/2025 | Ativa | Substituição de 1 seccionadora (SC 12737) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 750 kV TR 750/500 kV IVAIPORA TR3 PR | RB | FT TR 750/500 kV IVAIPORA TR3 PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/4/2017 | 3/7/2047 | R$24,318.68 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 750 kV TR 750/500 kV IVAIPORA TR3 PR | RB | FT TR 750/500 kV IVAIPORA TR3 PR | 062/2001 | IPCA | RBNI | DSP 1107/2021 | 11/30/2019 | 12/2/2049 | R$33,427.63 | 6/1/2025 | Ativa | F-S-STIVP-TR03-MC500-TP-LIISIV3 FASE A. Regularização de extrapatrimonial nos termos do Despacho nº 1.107/2021 Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 750 kV TR 750/500 kV IVAIPORA TR3 PR | RB | FT TR 750/500 kV IVAIPORA TR3 PR | 062/2001 | IPCA | RBNI | DSP 1107/2021 | 11/30/2019 | 12/2/2049 | R$33,427.63 | 6/1/2025 | Ativa | F-S-STIVP-TR03-MC500-TP-LIISIV3 FASE B. Regularização de extrapatrimonial nos termos do Despacho nº 1.107/2021 Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 750 kV TR 750/500 kV IVAIPORA TR3 PR | RB | FT TR 750/500 kV IVAIPORA TR3 PR | 062/2001 | IPCA | RBNI | DSP 1107/2021 | 11/30/2019 | 12/2/2049 | R$33,427.63 | 6/1/2025 | Ativa | F-S-STIVP-TR03-MC500-TP-LIISIV3 FASE C. Regularização de extrapatrimonial nos termos do Despacho nº 1.107/2021 Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 750 kV TR 750/500 kV IVAIPORA TR3 PR | RB | FT TR 750/500 kV IVAIPORA TR3 PR | 062/2001 | IPCA | RBNI | DSP 1107/2021 | 8/31/2020 | 9/3/2050 | R$41,912.70 | 6/1/2025 | Ativa | F-S-STIVP-TRANSF.CORRENTE FASE C-LIISIV3. Regularização de extrapatrimonial nos termos do Despacho nº 1.107/2021 Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 750 kV TR 750/500 kV IVAIPORA TR3 PR | RB | FT TR 750/500 kV IVAIPORA TR3 PR | 062/2001 | IPCA | RBNI | DSP 1107/2021 | 8/31/2020 | 9/3/2050 | R$41,912.70 | 6/1/2025 | Ativa | F-S-STIVP-TRANSF.CORRENTE FASE B-LIISIV3. Regularização de extrapatrimonial nos termos do Despacho nº 1.107/2021 Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 750 kV TR 750/500 kV IVAIPORA TR3 PR | RB | FT TR 750/500 kV IVAIPORA TR3 PR | 062/2001 | IPCA | RBNI | DSP 1107/2021 | 8/31/2020 | 9/3/2050 | R$41,912.70 | 6/1/2025 | Ativa | F-S-STIVP-TRANSF.CORRENTE FASE A-DJ12926. Regularização de extrapatrimonial nos termos do Despacho nº 1.107/2021 Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 750 kV TR 750/500 kV IVAIPORA TR2 PR | RB | FT TR 750/500 kV IVAIPORA TR2 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$622,784.52 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 750 kV TR 750/500 kV IVAIPORA TR2 PR | RB | FT TR 750/500 kV IVAIPORA TR2 PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,389,859.14 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 750 kV TR 750/500 kV IVAIPORA TR2 PR | RB | FT TR 750/500 kV IVAIPORA TR2 PR | 062/2001 | IPCA | RBNI | REA 5484/2015 | 12/24/2018 | 2/14/2048 | R$165,308.47 | 6/1/2025 | Ativa | Troca dos sistemas de proteção dos Bancos de transformador es 765/500 kV (AT02) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 750 kV TR 750/500 kV IVAIPORA TR2 PR | RB | FT TR 750/500 kV IVAIPORA TR2 PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 4/11/2022 | 7/14/2047 | R$146,903.89 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 750 kV TR 750/500 kV IVAIPORA TR1 PR | RB | FT TR 750/500 kV IVAIPORA TR1 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$622,784.52 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 750 kV TR 750/500 kV IVAIPORA TR1 PR | RB | FT TR 750/500 kV IVAIPORA TR1 PR | 062/2001 | IPCA | RBNI | REA 5484/2015 | 12/24/2018 | 12/23/2046 | R$142,724.94 | 6/1/2025 | Ativa | Troca dos sistemas de proteção dos Bancos de transformador es 765/500 kV (AT01) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 750 kV TR 750/500 kV IVAIPORA TR1 PR | RB | FT TR 750/500 kV IVAIPORA TR1 PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/19/2018 | 7/20/2049 | R$566,016.11 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 750 kV RTL 750 kV 330 Mvar IVAIPORA RIA2 PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,673.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 750 kV RTL 750 kV 329 Mvar IVAIPORA RIA3 PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,673.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 750 kV RTL 750 kV 329 Mvar IVAIPORA RIA1 PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,673.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 750 kV RTL 750 kV 150 Mvar IVAIPORA RFI3 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,673.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | MC 750 kV RTL 750 kV 150 Mvar IVAIPORA RFI2 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,673.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | MC 750 kV RTL 750 kV 150 Mvar IVAIPORA RFI1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,673.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | MC 750 kV RTB 750 kV 330 Mvar IVAIPORA RT8 PR | RB | FT RTB 750 kV 330 Mvar IVAIPORA RT8 PR | 062/2001 | IPCA | RBNIA | REA 15073/2024 | R$ 3,096,446.79 | 6/1/2025 | Prevista | T2023-166 | Instalação da conexão para o 2º banco de reatores de barra 765 kV - 3x110 Mvar, em 765 kV e arranjo DJM, na SE Ivaiporã. | ||||
| AXIA Energia | IVAIPORA | MC 750 kV RTB 750 kV 329 Mvar IVAIPORA RT7 PR | RB | FT RTB 750 kV 329 Mvar IVAIPORA RT7 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$613,762.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 750 kV RTB 750 kV 329 Mvar IVAIPORA RT7 PR | RB | FT RTB 750 kV 329 Mvar IVAIPORA RT7 PR | 062/2001 | IPCA | RBNI | REA 5484/2015 | 5/16/2019 | 5/15/2034 | R$137,356.64 | 6/1/2025 | Ativa | Troca dos sistemas de proteção do Banco de Reatores RT7 - 330 Mvar * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 750 kV RTB 750 kV 329 Mvar IVAIPORA RT7 PR | RB | FT RTB 750 kV 329 Mvar IVAIPORA RT7 PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/14/2022 | 12/27/2047 | R$126,571.72 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 750 kV CR 750 kV 528 Mvar IVAIPORA BC5B PR | RB | FT CR 750 kV 528 Mvar IVAIPORA BC5A PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,400.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 750 kV CR 750 kV 528 Mvar IVAIPORA BC5A PR | RB | FT CR 750 kV 528 Mvar IVAIPORA BC5A PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,400.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 750 kV CR 750 kV 528 Mvar IVAIPORA BC3B PR | RB | FT CR 750 kV 528 Mvar IVAIPORA BC3A PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,400.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 750 kV CR 750 kV 528 Mvar IVAIPORA BC3A PR | RB | FT CR 750 kV 528 Mvar IVAIPORA BC3A PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,400.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 750 kV CR 750 kV 528 Mvar IVAIPORA BC1B PR | RB | FT CR 750 kV 528 Mvar IVAIPORA BC1A PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,400.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 750 kV CR 750 kV 528 Mvar IVAIPORA BC1A PR | RB | FT CR 750 kV 528 Mvar IVAIPORA BC1A PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,400.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 750 kV CR 750 kV 508 Mvar IVAIPORA BC6B PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,400.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | MC 750 kV CR 750 kV 508 Mvar IVAIPORA BC6A PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,400.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | MC 750 kV CR 750 kV 508 Mvar IVAIPORA BC4B PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,400.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | MC 750 kV CR 750 kV 508 Mvar IVAIPORA BC4A PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,400.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | MC 750 kV CR 750 kV 508 Mvar IVAIPORA BC2B PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,400.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | MC 750 kV CR 750 kV 508 Mvar IVAIPORA BC2A PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,400.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | MC 69 kV TT 69/0,24 kV IVAIPORA AT03 PR | RB | FT TR 750/500 kV IVAIPORA TR3 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 69 kV TT 69/0,24 kV IVAIPORA AT02 PR | RB | FT TR 750/500 kV IVAIPORA TR2 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 69 kV TT 69/0,24 kV IVAIPORA AT01 PR | RB | FT TR 750/500 kV IVAIPORA TR1 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 69 kV RTB 69 kV 180 Mvar IVAIPORA RT3B PR | RB | FT RTB 69 kV 180 Mvar IVAIPORA RT3B PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,744.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 69 kV RTB 69 kV 180 Mvar IVAIPORA RT3A PR | RB | FT RTB 69 kV 180 Mvar IVAIPORA RT3A PR | 062/2001 | IPCA | RBNI | REA 1266/2008 | 2/9/2012 | 2/28/2037 | R$34,347.15 | 6/1/2025 | Ativa | T2000-182 | Instalação, na SE Ivaiporã, de um módulo de conexão 69 kV, arranjo barra simples, para o primeiro banco de Reatores RT3A de 180 Mvar em 69 kV *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | IVAIPORA | MC 69 kV RTB 69 kV 180 Mvar IVAIPORA RT2C PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT2C PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,744.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 69 kV RTB 69 kV 180 Mvar IVAIPORA RT2B PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT2B PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,744.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 69 kV RTB 69 kV 180 Mvar IVAIPORA RT2A PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT2A PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,744.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 69 kV RTB 69 kV 180 Mvar IVAIPORA RT1C PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,744.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 69 kV RTB 69 kV 180 Mvar IVAIPORA RT1C PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR | 062/2001 | IPCA | RMEL | REN 443/2011 | 1/22/2017 | 4/16/2040 | R$2,148.16 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR PRRT1C FASE A * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 69 kV RTB 69 kV 180 Mvar IVAIPORA RT1C PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR | 062/2001 | IPCA | RMEL | REN 443/2011 | 1/22/2017 | 4/16/2040 | R$2,148.16 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR PRRT1C FASE B * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 69 kV RTB 69 kV 180 Mvar IVAIPORA RT1C PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR | 062/2001 | IPCA | RMEL | REN 443/2011 | 1/22/2017 | 4/16/2040 | R$2,148.16 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR PRRT1C FASE C * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 69 kV RTB 69 kV 180 Mvar IVAIPORA RT1B PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,744.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 69 kV RTB 69 kV 180 Mvar IVAIPORA RT1B PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR | 062/2001 | IPCA | RMEL | REN 443/2011 | 1/21/2017 | 4/15/2040 | R$2,147.91 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR PRRT1B FASE A * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 69 kV RTB 69 kV 180 Mvar IVAIPORA RT1B PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR | 062/2001 | IPCA | RMEL | REN 443/2011 | 1/21/2017 | 4/15/2040 | R$2,147.91 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR PRRT1B FASE B * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 69 kV RTB 69 kV 180 Mvar IVAIPORA RT1B PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR | 062/2001 | IPCA | RMEL | REN 443/2011 | 1/21/2017 | 4/15/2040 | R$2,147.91 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR PRRT1B FASE C * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 69 kV RTB 69 kV 180 Mvar IVAIPORA RT1A PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,744.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 69 kV RTB 69 kV 180 Mvar IVAIPORA RT1A PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR | 062/2001 | IPCA | RMEL | REN 443/2011 | 1/20/2017 | 4/14/2040 | R$2,147.67 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR PRRT1A FASE A * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 69 kV RTB 69 kV 180 Mvar IVAIPORA RT1A PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR | 062/2001 | IPCA | RMEL | REN 443/2011 | 1/20/2017 | 4/14/2040 | R$2,147.67 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR PRRT1A FASE B * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 69 kV RTB 69 kV 180 Mvar IVAIPORA RT1A PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR | 062/2001 | IPCA | RMEL | REN 443/2011 | 1/20/2017 | 4/14/2040 | R$2,147.67 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PR PRRT1A FASE C * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 69 kV RTB 69 kV 180 Mvar IVAIPORA RT1A PR | RB | FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 8/14/2020 | 8/13/2053 | R$1,481.51 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 500 kV TR 750/500 kV IVAIPORA TR3 PR | RB | FT TR 750/500 kV IVAIPORA TR3 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 500 kV TR 750/500 kV IVAIPORA TR2 PR | RB | FT TR 750/500 kV IVAIPORA TR2 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 500 kV TR 750/500 kV IVAIPORA TR2 PR | RB | FT TR 750/500 kV IVAIPORA TR2 PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/31/2017 | 11/3/2047 | R$31,386.57 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | MC 500 kV TR 750/500 kV IVAIPORA TR1 PR | RB | FT TR 750/500 kV IVAIPORA TR1 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | MC 500 kV TR 750/500 kV IVAIPORA TR1 PR | RB | FT TR 750/500 kV IVAIPORA TR1 PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2018 | 1/4/2048 | R$31,553.38 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | IVAIPORA | MC 500 kV RTL 500 kV 100 Mvar IVAIPORA RT1 PR | RB | FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR | 004/2004 | IGPM | RBL | CC 004/2004 | 10/31/2005 | 2/18/2034 | R$ 1,688,757.51 | 6/1/2025 | Ativa | Contrato de Concessão nº 004/2004 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | IVAIPORA | IB 750 kV MG 750 kV IVAIPORA MG1 PR IB6 | RB | FT MG 750 kV IVAIPORA MG1 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$748,462.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | IB 750 kV MG 750 kV IVAIPORA MG1 PR IB5 | RB | FT MG 750 kV IVAIPORA MG1 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$748,462.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | IB 750 kV MG 750 kV IVAIPORA MG1 PR IB4 | RB | FT MG 750 kV IVAIPORA MG1 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$748,462.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | IB 750 kV MG 750 kV IVAIPORA MG1 PR IB3 | RB | FT MG 750 kV IVAIPORA MG1 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$748,462.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | IB 750 kV MG 750 kV IVAIPORA MG1 PR IB2 | RB | FT MG 750 kV IVAIPORA MG1 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$748,462.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | IB 750 kV MG 750 kV IVAIPORA MG1 PR IB1 | RB | FT MG 750 kV IVAIPORA MG1 PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$748,462.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | IB 750 kV MG 750 kV IVAIPORA MG1 PR IB1 | RB | FT MG 750 kV IVAIPORA MG1 PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/4/2017 | 3/7/2047 | R$30,517.13 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | IVAIPORA | IB 500 kV MG 500 kV IVAIPORA MG1 PR IB5 | RB | FT MG 500 kV IVAIPORA MG1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | IVAIPORA | IB 500 kV MG 500 kV IVAIPORA MG1 PR IB3 | RB | FT MG 500 kV IVAIPORA MG1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | IVAIPORA | IB 500 kV MG 500 kV IVAIPORA MG1 PR IB3 | RB | FT MG 500 kV IVAIPORA MG1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$667,954.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | IVAIPORA | IB 500 kV MG 500 kV IVAIPORA MG1 PR IB2 | RB | FT MG 500 kV IVAIPORA MG1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | IVAIPORA | IB 500 kV MG 500 kV IVAIPORA MG1 PR IB2 | RB | FT MG 500 kV IVAIPORA MG1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$667,954.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | IVAIPORA | IB 500 kV MG 500 kV IVAIPORA MG1 PR IB1 | RB | FT MG 500 kV IVAIPORA MG1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | IVAIPORA | IB 500 kV MG 500 kV IVAIPORA MG1 PR IB1 | RB | FT MG 500 kV IVAIPORA MG1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$667,954.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$707,119.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | 062/2001 | IPCA | RMEL | REN 643/2014 | 11/28/2016 | 12/20/2045 | R$31,902.35 | 6/1/2025 | Ativa | Substituição de 1 seccionadora (SC 12937) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | 062/2001 | IPCA | RBNI | REA 5861/2016 | 4/16/2018 | 4/15/2033 | R$16,557.85 | 6/1/2025 | Ativa | Substituição da teleproteção da LT Ivaiporã - Itaberá circuito 3 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 – 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | 062/2001 | IPCA | RBNI | REA 5861/2016 | 7/9/2019 | 7/8/2034 | R$27,792.32 | 6/1/2025 | Ativa | LT 765kV Ivaiporã - Itaberá C3 - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/4/2020 | 5/10/2047 | R$179,297.03 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | 062/2001 | IPCA | RBNI | DSP 1107/2021 | 1/1/2018 | 1/4/2048 | R$39,089.57 | 6/1/2025 | Ativa | S-STIV-SUBS.TPC LTIAIV3 FA NS12.6218-10. Regularização de extrapatrimonial nos termos do Despacho nº 1.107/2021 Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | 062/2001 | IPCA | RBNI | DSP 1107/2021 | 1/1/2018 | 1/4/2048 | R$39,089.57 | 6/1/2025 | Ativa | INSTALAÇÃO DO DCP NA LTIAIV3 - FASE B. Regularização de extrapatrimonial nos termos do Despacho nº 1.107/2021 Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | 062/2001 | IPCA | RBNI | DSP 1107/2021 | 1/1/2018 | 1/4/2048 | R$39,089.57 | 6/1/2025 | Ativa | DCP LTIAIV3 fase C. Regularização de extrapatrimonial nos termos do Despacho nº 1.107/2021 Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$707,119.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | 062/2001 | IPCA | RMEL | REN 643/2014 | 11/24/2016 | 11/6/2048 | R$273,599.86 | 6/1/2025 | Ativa | Substituição de 1 Disjuntor DJ12926 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | 062/2001 | IPCA | RBNI | REA 5861/2016 | 7/9/2019 | 7/8/2034 | R$27,792.32 | 6/1/2025 | Ativa | LT 765kV Ivaiporã - Itaberá C2 - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 8/9/2020 | 7/2/2042 | R$207,102.24 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$707,119.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,713,485.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | 062/2001 | IPCA | RBNI | REA 5861/2016 | 7/9/2019 | 7/8/2034 | R$27,792.32 | 6/1/2025 | Ativa | LT 765kV Ivaiporã - Itaberá C1 - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | 062/2001 | IPCA | RMEL | REN 905/2020 | 2/15/2020 | 1/8/2045 | R$314,618.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$707,119.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,713,485.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,909,001.79 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR | DIT | 062/2001 | IPCA | RCDM | REA 5861/2016 | 7/9/2019 | 7/8/2034 | R$50,615.25 | 6/1/2025 | Ativa | LT 765kV Foz do Iguaçu - Ivaiporã C3 - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/23/2020 | 7/21/2045 | R$274,574.58 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$707,119.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,713,485.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR | DIT | 062/2001 | IPCA | RCDM | REA 5861/2016 | 7/9/2019 | 7/8/2034 | R$50,615.25 | 6/1/2025 | Ativa | LT 765kV Foz do Iguaçu - Ivaiporã C2 - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 8/13/2019 | 5/9/2044 | R$263,540.47 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$707,119.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,713,485.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR | DIT | 062/2001 | IPCA | RCDM | REA 5861/2016 | 7/9/2019 | 7/8/2034 | R$50,615.25 | 6/1/2025 | Ativa | LT 765kV Foz do Iguaçu - Ivaiporã C1 - Incluir a unidade de medição sincrofasorial (PMU) a ser utilizada no Sistema de Medição Sincronizada de Fasores (SMSF) para o SIN (Sistema Interligado Nacional), incluindo os equipamentos/serviços necessários para prover todas as interligações de dados necessárias para disponibilizar as medições sincrofasoriais realizadas pelas PMUs até a RDS. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | IVAIPORA | EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/11/2020 | 4/7/2045 | R$272,009.74 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | IVAIPORA | EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR | RB | FT LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR | 004/2004 | IGPM | RBL | CC 004/2004 | 10/31/2005 | 2/18/2034 | R$ 3,377,515.00 | 6/1/2025 | Ativa | Contrato de Concessão nº 004/2004 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | IVAIPORA | EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR | RB | FT LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR | 004/2004 | IGPM | RMEL | REN 643/2014 | 11/30/2014 | 11/28/2045 | R$1,010.71 | 6/1/2025 | Ativa | Substituição das flexitestes dos circuitos STIV 1, 2 e 3, Cascavel Oeste, Salto Santiago 1 e 2 e Londrina 1 e 2 e do reator 1 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Sul | IVAIPORA | EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR | RB | FT LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR | 004/2004 | IGPM | RBNI | REA 5861/2016 | 5/31/2019 | 5/23/2034 | R$5,442.34 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Ivaiporã 1, 2 e 3, Londrina 1, Salto Santiago 1 e 2. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Sul | IVAIPORA | EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR | RB | FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | IVAIPORA | EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR | RB | FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR | 057/2001 | IPCA | RMEL | REN 643/2014 | 2/16/2014 | 2/15/2038 | R$36,630.62 | 6/1/2025 | Ativa | Substituição dos para-raios de 420 kV do circuito SSA 1 Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | IVAIPORA | EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR | RB | FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2034 | R$10,024.02 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Ivaiporã 1, 2 e 3, Londrina 1, Salto Santiago 1 e 2. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | IVAIPORA | EL 500 kV IVAIPORA LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR | RB | FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | IVAIPORA | EL 500 kV IVAIPORA LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR | RB | FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$713,154.95 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | IVAIPORA | EL 500 kV IVAIPORA LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR | RB | FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR | 057/2001 | IPCA | RMEL | REN 443/2011 | 9/13/2015 | 9/12/2039 | R$39,225.89 | 6/1/2025 | Ativa | Substituição dos para-raios 525 kV dos circuitos Areia, Londrina 1 e Stiv 1 e 2 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | IVAIPORA | EL 500 kV IVAIPORA LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR | RB | FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2034 | R$3,296.72 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Ivaiporã 1, 2 e 3, Londrina 1, Salto Santiago 1 e 2. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | IVAIPORA | EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-3 PR | RB | FT LT 500 kV IVAIPORA /IVAIPORA C-3 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | IVAIPORA | EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-3 PR | RB | FT LT 500 kV IVAIPORA /IVAIPORA C-3 PR | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2034 | R$3,296.72 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Ivaiporã 1, 2 e 3, Londrina 1, Salto Santiago 1 e 2. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | IVAIPORA | EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-2 PR | RB | FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | IVAIPORA | EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-2 PR | RB | FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$713,154.95 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | IVAIPORA | EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-2 PR | RB | FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR | 057/2001 | IPCA | RMEL | REN 443/2011 | 12/14/2016 | 12/13/2040 | R$41,296.75 | 6/1/2025 | Ativa | Substituição dos para-raios 525 kV dos circuitos Areia, Londrina 1 e Stiv 1 e 2 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | IVAIPORA | EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-2 PR | RB | FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2034 | R$3,296.72 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Ivaiporã 1, 2 e 3, Londrina 1, Salto Santiago 1 e 2. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | IVAIPORA | EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-1 PR | RB | FT LT 500 kV IVAIPORA /IVAIPORA C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | IVAIPORA | EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-1 PR | RB | FT LT 500 kV IVAIPORA /IVAIPORA C-1 PR | 057/2001 | IPCA | RMEL | REN 443/2011 | 12/16/2016 | 12/15/2040 | R$41,305.79 | 6/1/2025 | Ativa | Substituição dos para-raios 525 kV dos circuitos Areia, Londrina 1 e Stiv 1 e 2 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | IVAIPORA | EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-1 PR | RB | FT LT 500 kV IVAIPORA /IVAIPORA C-1 PR | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2034 | R$3,296.72 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Ivaiporã 1, 2 e 3, Londrina 1, Salto Santiago 1 e 2. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | IVAIPORA | EL 500 kV IVAIPORA LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR | RB | FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR | 004/2004 | IGPM | RBL | CC 004/2004 | 10/31/2005 | 2/18/2034 | R$ 3,377,515.00 | 6/1/2025 | Ativa | Contrato de Concessão nº 004/2004 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | IVAIPORA | EL 500 kV IVAIPORA LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR | RB | FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR | 004/2004 | IGPM | RMEL | REN 643/2014 | 6/16/2014 | 6/14/2045 | R$1,009.63 | 6/1/2025 | Ativa | Substituição das flexitestes dos circuitos STIV 1, 2 e 3, Cascavel Oeste, Salto Santiago 1 e 2 e Londrina 1 e 2 e do reator 1 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Sul | IVAIPORA | EL 500 kV IVAIPORA LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR | RB | FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR | 004/2004 | IGPM | RBNI | REA 8314/2019 | 10/13/2019 | 10/5/2034 | R$5,314.97 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente do circuito Cascavel Oeste 525 kV. Além das PMUs o sistema de comunicação associado adicional para transmissão do conjunto de medidas de todas as PMUs de sua responsabilidade para o Rio de Janeiro e Brasília. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Sul | IVAIPORA | EL 500 kV IVAIPORA LT 500 kV AREIA /IVAIPORA C-1 PR | RB | FT LT 500 kV AREIA /IVAIPORA C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | IVAIPORA | EL 500 kV IVAIPORA LT 500 kV AREIA /IVAIPORA C-1 PR | RB | FT LT 500 kV AREIA /IVAIPORA C-1 PR | 057/2001 | IPCA | RMEL | REN 443/2011 | 10/17/2015 | 10/16/2039 | R$39,379.57 | 6/1/2025 | Ativa | Substituição dos para-raios 525 kV dos circuitos Areia, Londrina 1 e Stiv 1 e 2 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | IVAIPORA | EL 500 kV IVAIPORA LT 500 kV AREIA /IVAIPORA C-1 PR | RB | FT LT 500 kV AREIA /IVAIPORA C-1 PR | 057/2001 | IPCA | RBNI | REA 8314/2019 | 10/13/2019 | 10/12/2034 | R$3,363.02 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente do circuito Areia 525 kV. Além das PMUs o sistema de comunicação associado adicional para transmissão do conjunto de medidas de todas as PMUs de sua responsabilidade para o Rio de Janeiro e Brasília. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | IVAIPORA | CR 750 kV 528 Mvar IVAIPORA BC5B PR | RB | FT CR 750 kV 528 Mvar IVAIPORA BC5A PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,543,835.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | CR 750 kV 528 Mvar IVAIPORA BC5B PR | RB | FT CR 750 kV 528 Mvar IVAIPORA BC5A PR | 062/2001 | IPCA | RMELP | REA 11449/2022 | R$ 12,583,341.95 | 6/1/2025 | Prevista | T2022-058 | Obra de Substituição Completa - Substituição completa do banco de capacitores série BSIAIV1 de 1056 Mvar, localizado na saída de linha da LT 765kV Ivaiporã - Itaberá C1, por outro de características similares. O banco é composto por 2 partes de 528 MVAr cada e ambas serão substituídas. | ||||
| AXIA Energia | IVAIPORA | CR 750 kV 528 Mvar IVAIPORA BC5A PR | RB | FT CR 750 kV 528 Mvar IVAIPORA BC5A PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,543,835.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | CR 750 kV 528 Mvar IVAIPORA BC5A PR | RB | FT CR 750 kV 528 Mvar IVAIPORA BC5A PR | 062/2001 | IPCA | RMELP | REA 11449/2022 | R$ 12,583,341.95 | 6/1/2025 | Prevista | T2022-058 | Obra de Substituição Completa - Substituição completa do banco de capacitores série BSIAIV1 de 1056 Mvar, localizado na saída de linha da LT 765kV Ivaiporã - Itaberá C1, por outro de características similares. (Módulo CR 750 kV 528 Mvar IVAIPORA BC5A PR, IdeMdl 13942) | ||||
| AXIA Energia | IVAIPORA | CR 750 kV 528 Mvar IVAIPORA BC3B PR | RB | FT CR 750 kV 528 Mvar IVAIPORA BC3A PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,543,835.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | CR 750 kV 528 Mvar IVAIPORA BC3B PR | RB | FT CR 750 kV 528 Mvar IVAIPORA BC3A PR | 062/2001 | IPCA | RMELP | REA 11449/2022 | R$ 12,583,341.95 | 6/1/2025 | Prevista | T2022-059 | Obra de Substituição Completa - Substituição completa do banco de capacitores série BSIAIV2 de 1056 Mvar, localizado na saída de linha da LT 765kV Ivaiporã - Itaberá C2, por outro de características similares. | 3T25 | |||
| AXIA Energia | IVAIPORA | CR 750 kV 528 Mvar IVAIPORA BC3A PR | RB | FT CR 750 kV 528 Mvar IVAIPORA BC3A PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,543,835.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | IVAIPORA | CR 750 kV 528 Mvar IVAIPORA BC3A PR | RB | FT CR 750 kV 528 Mvar IVAIPORA BC3A PR | 062/2001 | IPCA | RMELP | REA 11449/2022 | R$ 12,583,341.95 | 6/1/2025 | Prevista | T2022-059 | Obra de Substituição Completa - Substituição completa do banco de capacitores série BSIAIV2 de 1056 Mvar, localizado na saída de linha da LT 765kV Ivaiporã - Itaberá C2, por outro de características similares. | 3T25 | |||
| AXIA Energia | IVAIPORA | CR 750 kV 528 Mvar IVAIPORA BC1B PR | RB | FT CR 750 kV 528 Mvar IVAIPORA BC1A PR | 062/2001 | IPCA | RMEL | REA 11449/2022 | 2/10/2025 | 2/9/2045 | R$ 12,583,341.95 | 6/1/2025 | Ativa | T2022-060 | Obra de Substituição Completa - Substituição completa do banco de capacitores série BSIAIV3 de 1056 Mvar, localizado na saída de linha da LT 765kV Ivaiporã - Itaberá C3, por outro de características similares. | ||
| AXIA Energia | IVAIPORA | CR 750 kV 528 Mvar IVAIPORA BC1A PR | RB | FT CR 750 kV 528 Mvar IVAIPORA BC1A PR | 062/2001 | IPCA | RMEL | REA 11449/2022 | 2/10/2025 | 2/9/2045 | R$ 12,583,341.95 | 6/1/2025 | Ativa | T2022-060 | Obra de Substituição Completa - Substituição completa do banco de capacitores série BSIAIV3 de 1056 Mvar, localizado na saída de linha da LT 765kV Ivaiporã - Itaberá C3, por outro de características similares. | ||
| AXIA Energia | IVAIPORA | CR 750 kV 508 Mvar IVAIPORA BC6B PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,499,121.80 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | CR 750 kV 508 Mvar IVAIPORA BC6B PR | DIT | 062/2001 | IPCA | RMELP | REA 13051/2022 | R$ 12,739,945.73 | 6/1/2025 | Prevista | T2022-117 | Obra de Substituição Completa - Substituição, na SE IVAIPORA, de um Banco de capacitores série BC6B 750 kV - 508 Mvar localizado na saída de linha da LT 765kV Ivaiporã - Foz do Iguaçu C1. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | |||||
| AXIA Energia | IVAIPORA | CR 750 kV 508 Mvar IVAIPORA BC6A PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,499,121.80 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | CR 750 kV 508 Mvar IVAIPORA BC6A PR | DIT | 062/2001 | IPCA | RMELP | REA 13051/2022 | R$ 12,739,945.73 | 6/1/2025 | Prevista | T2022-117 | Obra de Substituição Completa - Substituição, na SE IVAIPORA, de um Banco de capacitores série BC6A 750 kV - 508 Mvar localizado na saída de linha da LT 765kV Ivaiporã - Foz do Iguaçu C1. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | |||||
| AXIA Energia | IVAIPORA | CR 750 kV 508 Mvar IVAIPORA BC4B PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,499,121.80 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | CR 750 kV 508 Mvar IVAIPORA BC4B PR | DIT | 062/2001 | IPCA | RMELP | REA 13051/2022 | R$ 12,739,945.73 | 6/1/2025 | Prevista | T2022-118 | Obra de Substituição Completa - Substituição completa do banco de capacitores série BC4B de 508 Mvar, localizado na saída de linha da LT 765kV Ivaiporã - Foz do Iguaçu C2. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | |||||
| AXIA Energia | IVAIPORA | CR 750 kV 508 Mvar IVAIPORA BC4A PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,499,121.80 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | IVAIPORA | CR 750 kV 508 Mvar IVAIPORA BC4A PR | DIT | 062/2001 | IPCA | RMELP | REA 13051/2022 | R$ 12,739,945.73 | 6/1/2025 | Prevista | T2022-118 | Obra de Substituição Completa - Substituição completa do banco de capacitores série BC4A de 508 Mvar, localizado na saída de linha da LT 765kV Ivaiporã - Foz do Iguaçu C2. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | |||||
| AXIA Energia | IVAIPORA | CR 750 kV 508 Mvar IVAIPORA BC2B PR | DIT | 062/2001 | IPCA | RMEL | REA 13051/2022 | 2/12/2025 | 2/11/2045 | R$ 12,739,945.73 | 6/1/2025 | Ativa | T2022-119 | Obra de Substituição Completa - Substituição completa do banco de capacitores série BC2B de 508 Mvar, localizado na saída de linha da LT 765kV Ivaiporã - Foz do Iguaçu C3. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | |||
| AXIA Energia | IVAIPORA | CR 750 kV 508 Mvar IVAIPORA BC2A PR | DIT | 062/2001 | IPCA | RMEL | REA 13051/2022 | 2/10/2025 | 2/9/2045 | R$ 12,739,945.73 | 6/1/2025 | Ativa | T2022-119 | Obra de Substituição Completa - Substituição completa do banco de capacitores série BC2A de 508 Mvar, localizado na saída de linha da LT 765kV Ivaiporã - Foz do Iguaçu C3. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | |||
| AXIA Energia Sul | IVINHEMA 2 | TR 230/138 kV IVINHEMA 2 TR2 MS | RBF | FT TR 230/138 kV IVINHEMA 2 TR2 MS | 008/2014 | IPCA | RBL | CC 008/2014 | 1/29/2016 | 1/29/2044 | R$897,752.54 | 6/1/2025 | Ativa | T2014-024 | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | IVINHEMA 2 | TR 230/138 kV IVINHEMA 2 TR1 MS | RBF | FT TR 230/138 kV IVINHEMA 2 TR1 MS | 008/2014 | IPCA | RBL | CC 008/2014 | 1/29/2016 | 1/29/2044 | R$897,752.54 | 6/1/2025 | Ativa | T2014-024 | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | IVINHEMA 2 | MG 230 kV IVINHEMA 2 MG3 MS | RB | FT MG 230 kV IVINHEMA 2 MG3 MS | 008/2014 | IPCA | RBL | CC 008/2014 | 1/29/2016 | 1/29/2044 | R$ 1,622,558.42 | 6/1/2025 | Ativa | T2014-024 | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | IVINHEMA 2 | MG 138 kV IVINHEMA 2 MG1 MS | DIT | 057/2001 | IPCA | RCDM | DSP 1525/2025 | 3/20/2025 | 3/19/2043 | R$72,570.19 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura Geral de Acessante -MIG-A 138 kV na SE Ivinhema 2, em função do seccionamento da LT 138 kV Ivinhema - Porto Primavera C1. | ||||
| AXIA Energia Sul | IVINHEMA 2 | MG 138 kV IVINHEMA 2 MG1 MS | DIT | 057/2001 | IPCA | RCDM | DSP 1525/2025 | 3/20/2025 | 3/19/2056 | R$15,078.97 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Módulo de Infraestrutura de Manobra em 138 kV, arranjo Barra Dupla a Quatro Chaves, na subestação Ivinhema 2, associada à Entrada de Linha da LT 138 kV Ivinhema – Ivinhema 2 C1. | ||||
| AXIA Energia Sul | IVINHEMA 2 | MG 138 kV IVINHEMA 2 MG1 MS | DIT | 057/2001 | IPCA | RCDM | DSP 1525/2025 | 3/20/2025 | 3/19/2056 | R$15,078.97 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Módulo de Infraestrutura de Manobra em 138 kV, arranjo Barra Dupla a Quatro Chaves, na subestação Ivinhema 2, associada à Entrada de Linha da LT 138 kV Ivinhema 2 – Porto Primavera C1. | ||||
| AXIA Energia Sul | IVINHEMA 2 | MC 230 kV TR 230/138 kV IVINHEMA 2 TR2 MS | RBF | FT TR 230/138 kV IVINHEMA 2 TR2 MS | 008/2014 | IPCA | RBL | CC 008/2014 | 1/29/2016 | 1/29/2044 | R$314,120.57 | 6/1/2025 | Ativa | T2014-024 | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | IVINHEMA 2 | MC 230 kV TR 230/138 kV IVINHEMA 2 TR1 MS | RBF | FT TR 230/138 kV IVINHEMA 2 TR1 MS | 008/2014 | IPCA | RBL | CC 008/2014 | 1/29/2016 | 1/29/2044 | R$314,120.57 | 6/1/2025 | Ativa | T2014-024 | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | IVINHEMA 2 | MC 138 kV TR 230/138 kV IVINHEMA 2 TR2 MS | RBF | FT TR 230/138 kV IVINHEMA 2 TR2 MS | 008/2014 | IPCA | RBL | CC 008/2014 | 1/29/2016 | 1/29/2044 | R$237,989.34 | 6/1/2025 | Ativa | T2014-024 | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | IVINHEMA 2 | MC 138 kV TR 230/138 kV IVINHEMA 2 TR1 MS | RBF | FT TR 230/138 kV IVINHEMA 2 TR1 MS | 008/2014 | IPCA | RBL | CC 008/2014 | 1/29/2016 | 1/29/2044 | R$237,989.34 | 6/1/2025 | Ativa | T2014-024 | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | IVINHEMA 2 | IB 138 kV MG 230 kV IVINHEMA 2 MG3 MS IB1 | DIT | 008/2014 | IPCA | RPEC | CC 008/2014 | 1/29/2016 | 1/29/2044 | R$396,292.56 | 6/1/2025 | Ativa | T2014-024 | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Sul | IVINHEMA 2 | EL 138 kV IVINHEMA 2 LT 138 kV IVINHEMA 2 /NOVA ANDRADINA C-1 MS | DIT | 057/2001 | IPCA | RCDM | DSP 1525/2025 | 3/20/2025 | 3/19/2052 | R$151,030.58 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 138 kV, arranjo Barra Dupla a Quatro Chaves, na subestação Ivinhema 2, associada à Linha de Transmissão 138 kV Ivinhema 2 – Porto Primavera C1. | ||||
| AXIA Energia Sul | IVINHEMA 2 | EL 138 kV IVINHEMA 2 LT 138 kV IVINHEMA /IVINHEMA 2 C-1 MS | DIT | 057/2001 | IPCA | RCDM | DSP 1525/2025 | 3/20/2025 | 3/19/2052 | R$151,030.58 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 138 kV, arranjo Barra Dupla a Quatro Chaves, na subestação Ivinhema 2, associada à Linha de Transmissão 138 kV Ivinhema – Ivinhema 2 C1. | ||||
| AXIA Energia Sul | J.LACERDA-A | TR 230/69 kV J.LACERDA-A TR11 SC | RBF | FT TR 230/69 kV J.LACERDA-A TR11 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$281,008.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-A | TR 230/69 kV J.LACERDA-A TR10 SC | RBF | FT TR 230/69 kV J.LACERDA-A TR10 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$281,008.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-A | TR 230/69 kV J.LACERDA-A TR10 SC | RBF | FT TR 230/69 kV J.LACERDA-A TR10 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$493,192.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-A | TR 230/69 kV J.LACERDA-A TR10 SC | RBF | FT TR 230/69 kV J.LACERDA-A TR10 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$417,742.96 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-A | TR 230/138 kV J.LACERDA-A TR7 SC | RBF | FT TR 230/138 kV J.LACERDA-A TR7 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$288,677.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-A | TR 230/138 kV J.LACERDA-A TR7 SC | RBF | FT TR 230/138 kV J.LACERDA-A TR7 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$506,652.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-A | TR 230/138 kV J.LACERDA-A TR7 SC | RBF | FT TR 230/138 kV J.LACERDA-A TR7 SC | 057/2001 | IPCA | RBNIA | DSP 3355/2023 | R$ 2,305,274.99 | 6/1/2025 | Prevista | T2023-145 | Obra de Substituição Completa - Substituição do autotransformador trifásico TR7 230/138 kV - 79 MVA, por autotransformador trifásico de 120 MVA, devido final de vida útil técnica. (Rotina-Substituição - o IdeMdl 11501 será substituído pelo novo equipamento). | ||||
| AXIA Energia Sul | J.LACERDA-A | TR 230/138 kV J.LACERDA-A TR5 SC | RBF | FT TR 230/138 kV J.LACERDA-A TR5 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$288,677.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-A | TR 230/138 kV J.LACERDA-A TR5 SC | RBF | FT TR 230/138 kV J.LACERDA-A TR5 SC | 057/2001 | IPCA | RMEL | REN 643/2014 | 9/7/2014 | 9/6/2042 | R$79,721.19 | 6/1/2025 | Ativa | Aquisição e instalação da Proteção Diferencial de Sobrecorrente do TF5 230/138 kV. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | J.LACERDA-A | TR 230/138 kV J.LACERDA-A TR5 SC | RBF | FT TR 230/138 kV J.LACERDA-A TR5 SC | 057/2001 | IPCA | RBNIA | DSP 3355/2023 | R$ 2,305,274.99 | 6/1/2025 | Prevista | T2023-138 | Obra de Substituição Completa - Substituição do autotransformador trifásico TR5 230/138 kV - 79 MVA, por autotransformador trifásico de 120 MVA, devido final de vida útil técnica. (Rotina-Substituição - IdeMdl 11498). | ||||
| AXIA Energia Sul | J.LACERDA-A | TR 138/69 kV J.LACERDA-A TRR1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$113,221.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-A | TR 138/69 kV J.LACERDA-A TR9 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$179,210.39 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-A | TR 138/69 kV J.LACERDA-A TR9 SC | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$314,528.94 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-A | TR 138/69 kV J.LACERDA-A TR9 SC | DIT | 057/2001 | IPCA | RCDMA | DSP 3355/2023 | R$ 1,538,629.57 | 6/1/2025 | Prevista | T2023-149 | Obra de Substituição Completa - Substituição do transformador trifásico TR9 138/69 kV de 50 MVA, por transformador trifásico de 60 MVA, devido final de vida útil técnica. (Rotina-Substituição - IdeMdl 11489). | |||||
| AXIA Energia Sul | J.LACERDA-A | TR 138/69 kV J.LACERDA-A TR8 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$113,221.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-A | TR 138/69 kV J.LACERDA-A TR8 SC | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$198,713.45 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-A | TR 138/69 kV J.LACERDA-A TR8 SC | DIT | 057/2001 | IPCA | RCDMA | DSP 3355/2023 | R$ 1,525,456.75 | 6/1/2025 | Prevista | T2023-148 | Obra de Substituição Completa - Substituição do transformador trifásico TR8 138/69 kV - 25 MVA, por transformador trifásico de 60 MVA, devido final de vida útil técnica. (Rotina-Substituição - IdeMdl 11486). | |||||
| AXIA Energia Sul | J.LACERDA-A | MG 230 kV J.LACERDA-A MG1 SC | RB | FT MG 230 kV J.LACERDA-A MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$610,549.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-A | MG 230 kV J.LACERDA-A MG1 SC | RB | FT MG 230 kV J.LACERDA-A MG1 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 10/8/2020 | 4/11/2042 | R$113,417.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | J.LACERDA-A | MC 69 kV TR 230/69 kV J.LACERDA-A TR11 SC | RBF | FT TR 230/69 kV J.LACERDA-A TR11 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$48,587.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-A | MC 69 kV TR 230/69 kV J.LACERDA-A TR10 SC | RBF | FT TR 230/69 kV J.LACERDA-A TR10 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$48,587.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-A | MC 69 kV TR 230/69 kV J.LACERDA-A TR10 SC | RBF | FT TR 230/69 kV J.LACERDA-A TR10 SC | 057/2001 | IPCA | RMEL | REN 643/2014 | 8/4/2013 | 8/3/2037 | R$5,458.46 | 6/1/2025 | Ativa | Substituição dos para-raios 69 kV de SiC por ZnO do TF10.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | J.LACERDA-A | MC 69 kV TR 230/69 kV J.LACERDA-A TR10 SC | RBF | FT TR 230/69 kV J.LACERDA-A TR10 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$85,275.75 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-A | MC 69 kV TR 138/69 kV J.LACERDA-A TR9 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$48,587.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-A | MC 69 kV TR 138/69 kV J.LACERDA-A TR9 SC | DIT | 057/2001 | IPCA | RCDMA | DSP 3355/2023 | R$516,443.11 | 6/1/2025 | Prevista | T2023-149 | Obra de Substituição Completa - Substituição de Conexão de Transformador (CT) de 69 kV para o TR9 (Rotina-Substituição - IdeMdl 11491). | |||||
| AXIA Energia Sul | J.LACERDA-A | MC 69 kV TR 138/69 kV J.LACERDA-A TR8 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$48,587.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-A | MC 69 kV TR 138/69 kV J.LACERDA-A TR8 SC | DIT | 057/2001 | IPCA | RCDMA | DSP 3355/2023 | R$511,146.57 | 6/1/2025 | Prevista | T2023-148 | Obra de Substituição Completa - Substituição de Conexão de Transformador (CT) de 69 kV para o TR8 (Rotina-Substituição - IdeMdl 11488). | |||||
| AXIA Energia Sul | J.LACERDA-A | MC 230 kV TR 230/69 kV J.LACERDA-A TR11 SC | RBF | FT TR 230/69 kV J.LACERDA-A TR11 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$126,634.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-A | MC 230 kV TR 230/69 kV J.LACERDA-A TR10 SC | RBF | FT TR 230/69 kV J.LACERDA-A TR10 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$126,634.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-A | MC 230 kV TR 230/69 kV J.LACERDA-A TR10 SC | RBF | FT TR 230/69 kV J.LACERDA-A TR10 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$222,253.60 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-A | MC 230 kV TR 230/138 kV J.LACERDA-A TR7 SC | RBF | FT TR 230/138 kV J.LACERDA-A TR7 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$126,634.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-A | MC 230 kV TR 230/138 kV J.LACERDA-A TR7 SC | RBF | FT TR 230/138 kV J.LACERDA-A TR7 SC | 057/2001 | IPCA | RBNI | REA 7761/2019 | 4/6/2022 | 4/8/2052 | R$24,678.79 | 6/1/2025 | Ativa | Substituição de 3 Transformador de Corrente(s) no vão Transformador 7(TF7) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | J.LACERDA-A | MC 230 kV TR 230/138 kV J.LACERDA-A TR7 SC | RBF | FT TR 230/138 kV J.LACERDA-A TR7 SC | 057/2001 | IPCA | RBNIA | DSP 3355/2023 | R$ 1,531,501.73 | 6/1/2025 | Prevista | T2023-145 | Obra de Substituição Completa - Substituição de Conexão de Transformador (CT) de 230 kV para o TR7 (Rotina-Substituição - IdeMdl 11502). | ||||
| AXIA Energia Sul | J.LACERDA-A | MC 230 kV TR 230/138 kV J.LACERDA-A TR5 SC | RBF | FT TR 230/138 kV J.LACERDA-A TR5 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$126,634.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-A | MC 230 kV TR 230/138 kV J.LACERDA-A TR5 SC | RBF | FT TR 230/138 kV J.LACERDA-A TR5 SC | 057/2001 | IPCA | RMEL | REN 643/2014 | 9/10/2014 | 9/9/2038 | R$18,066.09 | 6/1/2025 | Ativa | Substituição dos para-raios 230 kV de SiC do TF 5. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | J.LACERDA-A | MC 230 kV TR 230/138 kV J.LACERDA-A TR5 SC | RBF | FT TR 230/138 kV J.LACERDA-A TR5 SC | 057/2001 | IPCA | RBNIA | DSP 3355/2023 | R$ 1,531,501.73 | 6/1/2025 | Prevista | T2023-138 | Obra de Substituição Completa - Substituição de Conexão de Transformador (CT) de 230 kV para o TR5 (Rotina-Substituição - IdeMdl 11499). | ||||
| AXIA Energia Sul | J.LACERDA-A | MC 230 kV TR 230/138 kV J.LACERDA-A TR5 SC | RBF | FT TR 230/138 kV J.LACERDA-A TR5 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 5/17/2022 | 5/19/2052 | R$25,508.10 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | J.LACERDA-A | MC 138 kV TR 230/138 kV J.LACERDA-A TR7 SC | RBF | FT TR 230/138 kV J.LACERDA-A TR7 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$96,926.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-A | MC 138 kV TR 230/138 kV J.LACERDA-A TR7 SC | RBF | FT TR 230/138 kV J.LACERDA-A TR7 SC | 057/2001 | IPCA | RBNIA | DSP 3355/2023 | R$ 1,159,854.40 | 6/1/2025 | Prevista | T2023-145 | Obra de Substituição Completa - Substituição de Conexão de Transformador (CT) de 138 kV para o TR7 (Rotina-Substituição - o IdeMdl 11503 será substituído pelo novo equipamento). | ||||
| AXIA Energia Sul | J.LACERDA-A | MC 138 kV TR 230/138 kV J.LACERDA-A TR5 SC | RBF | FT TR 230/138 kV J.LACERDA-A TR5 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$96,926.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-A | MC 138 kV TR 230/138 kV J.LACERDA-A TR5 SC | RBF | FT TR 230/138 kV J.LACERDA-A TR5 SC | 057/2001 | IPCA | RBNIA | DSP 3355/2023 | R$ 1,159,854.40 | 6/1/2025 | Prevista | T2023-138 | Obra de Substituição Completa - Substituição de Conexão de Transformador (CT) de 138 kV para o TR5 (Rotina-Substituição - o IdeMdl 11500 será substituído pelo novo equipamento). | ||||
| AXIA Energia Sul | J.LACERDA-A | MC 138 kV TR 138/69 kV J.LACERDA-A TR9 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$96,926.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-A | MC 138 kV TR 138/69 kV J.LACERDA-A TR9 SC | DIT | 057/2001 | IPCA | RCDMA | DSP 3355/2023 | R$ 1,172,371.35 | 6/1/2025 | Prevista | T2023-149 | Obra de Substituição Completa - Substituição de Conexão de Transformador (CT) de 138 kV para o TR9 (Rotina-Substituição - IdeMdl 40970). | |||||
| AXIA Energia Sul | J.LACERDA-A | MC 138 kV TR 138/69 kV J.LACERDA-A TR8 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$96,926.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-A | MC 138 kV TR 138/69 kV J.LACERDA-A TR8 SC | DIT | 057/2001 | IPCA | RCDMA | DSP 3355/2023 | R$ 1,159,627.09 | 6/1/2025 | Prevista | T2023-148 | Obra de Substituição Completa - Substituição de Conexão de Transformador (CT) de 138 kV para o TR8 (Rotina-Substituição - IdeMdl 40969). | |||||
| AXIA Energia Sul | J.LACERDA-A | IB 230 kV MG 230 kV J.LACERDA-A MG1 SC IB2 | RB | FT MG 230 kV J.LACERDA-A MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$100,223.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-A | IB 138 kV MG 230 kV J.LACERDA-A MG1 SC IB1 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,027.82 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-A | IB 138 kV MG 230 kV J.LACERDA-A MG1 SC IB1 | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 11/7/2022 | 11/9/2052 | R$62,247.31 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | J.LACERDA-A | EL 69 kV J.LACERDA-A TUBARAO C2 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,961.27 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-A | EL 69 kV J.LACERDA-A TUBARAO C1 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,961.27 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-A | EL 69 kV J.LACERDA-A BRACO NORTE | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,961.27 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-A | EL 230 kV J.LACERDA-A LT 230 kV J.LACERDA-A /U.JLACERDA-A C-2 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-A | EL 230 kV J.LACERDA-A LT 230 kV J.LACERDA-A /U.JLACERDA-A C-2 SC | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 12/15/2022 | 12/17/2052 | R$25,913.36 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | J.LACERDA-A | EL 230 kV J.LACERDA-A LT 230 kV J.LACERDA-A /U.JLACERDA-A C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-A | EL 230 kV J.LACERDA-A LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC | RB | FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-A | EL 230 kV J.LACERDA-A LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC | RB | FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-A | EL 138 kV J.LACERDA-A LT 138 kV J.LACERDA-A /U.JLACERDA-A C-3 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$145,187.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-A | EL 138 kV J.LACERDA-A LT 138 kV J.LACERDA-A /U.JLACERDA-A C-2 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$145,187.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-A | EL 138 kV J.LACERDA-A LT 138 kV J.LACERDA-A /U.JLACERDA-A C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$145,187.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-A | EL 138 kV J.LACERDA-A LT 138 kV IMBITUBA /J.LACERDA-A C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$145,187.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-A | EL 138 kV J.LACERDA-A LT 138 kV C.B.CATARINEN /J.LACERDA-A C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$145,187.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-B | MG 230 kV J.LACERDA-B MG1 SC | RB | FT MG 230 kV J.LACERDA-B MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$488,618.25 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-B | MG 230 kV J.LACERDA-B MG1 SC | RB | FT MG 230 kV J.LACERDA-B MG1 SC | 057/2001 | IPCA | RBNI | REA 6630/2017 | 11/28/2017 | 11/27/2034 | R$15,114.74 | 6/1/2025 | Ativa | Instalação de 2 carregadores de baterias de 48 Vcc. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | J.LACERDA-B | MG 230 kV J.LACERDA-B MG1 SC | RB | FT MG 230 kV J.LACERDA-B MG1 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 10/11/2022 | 5/26/2048 | R$201,493.24 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | J.LACERDA-B | IB 230 kV MG 230 kV J.LACERDA-B MG1 SC IB1 | RB | FT MG 230 kV J.LACERDA-B MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,146.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-B | EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-C C-2 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$177,524.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-B | EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-C C-2 SC | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$311,570.00 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-B | EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-C C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$195,444.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-B | EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-C C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$343,021.80 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-B | EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-B C-4 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$182,413.48 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-B | EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-B C-4 SC | DIT | 057/2001 | IPCA | RMEL | REN 643/2014 | 10/27/2014 | 10/26/2031 | R$9,484.76 | 6/1/2025 | Ativa | Substituição de 1 baterias 48 Vcc. (primeira de duas) Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | J.LACERDA-B | EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-B C-4 SC | DIT | 057/2001 | IPCA | RMEL | REN 643/2014 | 10/17/2014 | 10/16/2031 | R$9,468.35 | 6/1/2025 | Ativa | Substituição de 1 baterias 48 Vcc. (segunda de duas) Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | J.LACERDA-B | EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-B C-4 SC | DIT | 057/2001 | IPCA | RCDM | REN 905/2020 | 7/20/2022 | 7/22/2052 | R$74,620.73 | 6/1/2025 | Ativa | Subtituição de 3 Transformadores de Corrente do vão UTLB 3 (UTLB 3).. Superação Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | J.LACERDA-B | EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-B C-3 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$182,413.48 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-B | EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-B C-3 SC | DIT | 057/2001 | IPCA | RCDM | REA 7761/2019 | 7/20/2022 | 7/22/2052 | R$74,620.73 | 6/1/2025 | Ativa | Subtituição de 3 Transformadores de Corrente do vão UTLB 4 (UTLB 4).. Superação Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | J.LACERDA-B | EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-B C-2 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$182,413.48 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-B | EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-B C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$182,413.48 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | J.LACERDA-B | EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC | RB | FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$195,444.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-B | EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC | RB | FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC | 057/2001 | IPCA | RBNI | REA 8314/2019 | 12/19/2021 | 12/18/2036 | R$69,218.69 | 6/1/2025 | Ativa | Substituição do sistema de proteção eletromecânica por digital da LT 230 kV SID C-2. Substituição dos painéis de proteção principal e alternada, e dos cabos de controle e potência associados (2.905 m). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | J.LACERDA-B | EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC | RB | FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 4/25/2022 | 5/31/2051 | R$271,713.18 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | J.LACERDA-B | EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC | RB | FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC | 057/2001 | IPCA | RBNI | DSP 682/2022 | 1/25/2023 | 1/24/2056 | R$105,533.88 | 6/1/2025 | Ativa | Substituição de Disjuntor tripolar 230 kV, DJ722, referente a LT J. Lacerda B - Siderópolis C-2. Associado à obra são esperadas substituições ou adaptações de fundações e suportes existentes, cabos de controle e potência, barramento, conectores e conexão do aterramento do equipamento.. Final de vida útil. Riscos de danos às instalações devido à perda de confiabilidade. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | J.LACERDA-B | EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC | RB | FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC | 057/2001 | IPCA | RBNI | REA 7528/2018 | 10/31/2022 | 11/2/2052 | R$103,309.33 | 6/1/2025 | Ativa | Substituição de Transformadores de Corrente 230 kV, referente a LT J. Lacerda B - Siderópolis C-2, Fases A, B, C. Associado à obra são esperadas substituições/adaptações de fundações e suportes, caixa de junção, cabos de controle e potência, barramento, conectores e conexão de aterramento.. Final de vida útil. Riscos de danos às instalações devido à perda de confiabilidade. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | J.LACERDA-B | EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC | RB | FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$195,444.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-B | EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC | RB | FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC | 057/2001 | IPCA | RBNI | REA 8314/2019 | 12/6/2021 | 12/5/2036 | R$35,617.25 | 6/1/2025 | Ativa | Substituição do sistema de proteção eletromecânica por digital da LT 230 kV SID C-1. Substituição dos painéis de proteção principal e alternada, e dos cabos de controle e potência associados (2.905 m). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | J.LACERDA-B | EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC | RB | FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 4/9/2021 | 2/19/2049 | R$107,862.69 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | J.LACERDA-B | EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC | RB | FT LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$195,444.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-B | EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC | RB | FT LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 8/1/2018 | 7/31/2042 | R$30,558.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | J.LACERDA-B | EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC | RB | FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$195,444.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-B | EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC | RB | FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$195,444.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-B | EL 230 kV J.LACERDA-B LT 230 kV BIGUACU /J.LACERDA-B C-1 SC | RB | FT LT 230 kV BIGUACU /J.LACERDA-B C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$195,444.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | J.LACERDA-B | EL 230 kV J.LACERDA-B LT 230 kV BIGUACU /J.LACERDA-B C-1 SC | RB | FT LT 230 kV BIGUACU /J.LACERDA-B C-1 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 8/1/2018 | 7/31/2042 | R$30,558.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JABOATAO II | TT 69/0 kV JABOATAO II TT1 PE | DIT | 017/2012 | IPCA | RPEC | CC 017/2012 | 4/29/2018 | 6/1/2042 | R$72,946.88 | 6/1/2025 | Ativa | T2012-060-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | JABOATAO II | TR 230/69 kV JABOATAO II TR2 PE | RBF | FT TR 230/69 kV JABOATAO II TR2 PE | 017/2012 | IPCA | RBL | CC 017/2012 | 4/29/2018 | 6/1/2042 | R$ 1,845,566.17 | 6/1/2025 | Ativa | T2012-060-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | JABOATAO II | TR 230/69 kV JABOATAO II TR1 PE | RBF | FT TR 230/69 kV JABOATAO II TR1 PE | 017/2012 | IPCA | RBL | CC 017/2012 | 4/29/2018 | 6/1/2042 | R$ 1,845,566.17 | 6/1/2025 | Ativa | T2012-060-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | JABOATAO II | MG 230 kV JABOATAO II MG1 PE | RB | FT MG 230 kV JABOATAO II MG1 PE | 017/2012 | IPCA | RBL | CC 017/2012 | 4/29/2018 | 6/1/2042 | R$ 1,284,206.30 | 6/1/2025 | Ativa | T2012-060-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | JABOATAO II | MC 69 kV TT 69/0 kV JABOATAO II TT1 PE | DIT | 017/2012 | IPCA | RPEC | CC 017/2012 | 4/29/2018 | 6/1/2042 | R$75,858.44 | 6/1/2025 | Ativa | T2012-060-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | JABOATAO II | MC 69 kV TR 230/69 kV JABOATAO II TR2 PE | RBF | FT TR 230/69 kV JABOATAO II TR2 PE | 017/2012 | IPCA | RBL | CC 017/2012 | 4/29/2018 | 6/1/2042 | R$241,610.64 | 6/1/2025 | Ativa | T2012-060-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | JABOATAO II | MC 69 kV TR 230/69 kV JABOATAO II TR1 PE | RBF | FT TR 230/69 kV JABOATAO II TR1 PE | 017/2012 | IPCA | RBL | CC 017/2012 | 4/29/2018 | 6/1/2042 | R$241,610.64 | 6/1/2025 | Ativa | T2012-060-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | JABOATAO II | MC 230 kV TR 230/69 kV JABOATAO II TR2 PE | RBF | FT TR 230/69 kV JABOATAO II TR2 PE | 017/2012 | IPCA | RBL | CC 017/2012 | 4/29/2018 | 6/1/2042 | R$592,553.94 | 6/1/2025 | Ativa | T2012-060-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | JABOATAO II | MC 230 kV TR 230/69 kV JABOATAO II TR1 PE | RBF | FT TR 230/69 kV JABOATAO II TR1 PE | 017/2012 | IPCA | RBL | CC 017/2012 | 4/29/2018 | 6/1/2042 | R$592,553.94 | 6/1/2025 | Ativa | T2012-060-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | JABOATAO II | IB 69 kV MG 230 kV JABOATAO II MG1 PE IB1 | DIT | 017/2012 | IPCA | RPEC | CC 017/2012 | 4/29/2018 | 6/1/2042 | R$122,177.87 | 6/1/2025 | Ativa | T2012-060-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | JABOATAO II | IB 230 kV MG 230 kV JABOATAO II MG1 PE IB1 | RB | FT MG 230 kV JABOATAO II MG1 PE | 017/2012 | IPCA | RBL | CC 017/2012 | 4/29/2018 | 6/1/2042 | R$515,824.24 | 6/1/2025 | Ativa | T2012-060-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | JABOATAO II | EL 69 kV JABOATAO II DIST5 | DIT | 017/2012 | IPCA | RPEC | CC 017/2012 | 4/29/2018 | 6/1/2042 | R$209,503.45 | 6/1/2025 | Ativa | T2012-060-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | JABOATAO II | EL 69 kV JABOATAO II DIST4 | DIT | 017/2012 | IPCA | RPEC | CC 017/2012 | 4/29/2018 | 6/1/2042 | R$209,503.45 | 6/1/2025 | Ativa | T2012-060-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | JABOATAO II | EL 69 kV JABOATAO II DIST3 | DIT | 017/2012 | IPCA | RPEC | CC 017/2012 | 4/29/2018 | 6/1/2042 | R$209,503.45 | 6/1/2025 | Ativa | T2012-060-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | JABOATAO II | EL 69 kV JABOATAO II DIST2 | DIT | 017/2012 | IPCA | RPEC | CC 017/2012 | 4/29/2018 | 6/1/2042 | R$209,503.45 | 6/1/2025 | Ativa | T2012-060-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | JABOATAO II | EL 69 kV JABOATAO II DIST1 | DIT | 017/2012 | IPCA | RPEC | CC 017/2012 | 4/29/2018 | 6/1/2042 | R$209,503.45 | 6/1/2025 | Ativa | T2012-060-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | JABOATAO II | EL 230 kV JABOATAO II LT 230 kV RECIFE II /JABOATAO II C-1 PE | RB | FT LT 230 kV RECIFE II /JABOATAO II C-1 PE | 061/2001 | IPCA | RBNIA | REA 8328/2019 | R$140,077.38 | 6/1/2025 | Prevista | T2019-075 | Adequações da Entrada de Linha, na SE Jaboatão II, na EL para Recife II, em função do reencabeçamento da LT 230 kV Pirapama II - Recife II C2 na SE Jaboatão II. | ||||
| AXIA Energia Nordeste | JABOATAO II | EL 230 kV JABOATAO II LT 230 kV RECIFE II /JABOATAO II C-1 PE | RB | FT LT 230 kV RECIFE II /JABOATAO II C-1 PE | 061/2001 | IPCA | RBNI | REA 10092/2021 | 2/23/2021 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Jaboatão II, associada à linha de transmissão 230 kV Recife II – Jaboatão II. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JABOATAO II | EL 230 kV JABOATAO II LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE | RB | FT LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE | 061/2001 | IPCA | RBNI | REA 10092/2021 | 2/23/2021 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Jaboatão II, associada à linha de transmissão 230 kV Jaboatão II – Pirapama II. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JACARACANGA | TT 69/13,8 kV JACARACANGA TA2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | TT 69/13,8 kV JACARACANGA TA2 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$248,222.69 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | TT 69/13,8 kV JACARACANGA TA2 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$228,831.00 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | TT 69/13,8 kV JACARACANGA TA2 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/14/2021 | 6/17/2051 | R$ 803.83 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JACARACANGA | TT 69/13,8 kV JACARACANGA TA1 BA | DIT | 061/2001 | IPCA | RCDM | REA 3578/2012 | 2/5/2017 | 10/4/2047 | R$187,894.79 | 6/1/2025 | Ativa | Obra de Substituição Completa - Substituição de 1 transformador de aterramento: 02A1. (Potência: 7,5 MVA) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | JACARACANGA | TR 69/13,8 kV JACARACANGA TR7 BA | RB | FT MG 230 kV JACARACANGA MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JACARACANGA | TR 69/13,8 kV JACARACANGA TR7 BA | RB | FT MG 230 kV JACARACANGA MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$76,466.27 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JACARACANGA | TR 69/13,8 kV JACARACANGA TR7 BA | RB | FT MG 230 kV JACARACANGA MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$70,492.55 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JACARACANGA | TR 230/69 kV JACARACANGA TR3 BA | RBF | FT TR 230/69 kV JACARACANGA TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JACARACANGA | TR 230/69 kV JACARACANGA TR2 BA | RBF | FT TR 230/69 kV JACARACANGA TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JACARACANGA | TR 230/69 kV JACARACANGA TR2 BA | RBF | FT TR 230/69 kV JACARACANGA TR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JACARACANGA | TR 230/69 kV JACARACANGA TR2 BA | RBF | FT TR 230/69 kV JACARACANGA TR2 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 4/26/2017 | 4/3/2052 | R$25,477.44 | 6/1/2025 | Ativa | Substituição de BUCHAS, SE JCR 04T2 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JACARACANGA | TR 230/69 kV JACARACANGA TR2 BA | RBF | FT TR 230/69 kV JACARACANGA TR2 BA | 061/2001 | IPCA | RMELP | REA 9918/2021 | R$ 1,865,740.76 | 6/1/2025 | Prevista | T2020-012 | Obra de Substituição Completa - Substituição do transformador trifásico TR2 230/69 kV - 100 MVA da Subestação Jacaracanga. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia Nordeste | JACARACANGA | TR 230/69 kV JACARACANGA TR2 BA | RBF | FT TR 230/69 kV JACARACANGA TR2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/20/2022 | 3/28/2057 | R$18,632.39 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JACARACANGA | TR 230/69 kV JACARACANGA TR1 BA | RBF | FT TR 230/69 kV JACARACANGA TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JACARACANGA | TR 230/69 kV JACARACANGA TR1 BA | RBF | FT TR 230/69 kV JACARACANGA TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JACARACANGA | TR 230/69 kV JACARACANGA TR1 BA | RBF | FT TR 230/69 kV JACARACANGA TR1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 4/22/2017 | 3/30/2052 | R$8,489.92 | 6/1/2025 | Ativa | Substituição de BUCHAS, SE JCR 04T1 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JACARACANGA | TR 230/69 kV JACARACANGA TR1 BA | RBF | FT TR 230/69 kV JACARACANGA TR1 BA | 061/2001 | IPCA | RMELP | REA 9918/2021 | R$ 1,865,740.76 | 6/1/2025 | Prevista | T2020-010 | Obra de Substituição Completa - Substituição do transformador trifásico TR1 230/69 kV - 100 MVA da Subestação Jacaracanga. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | 3T25 | |||
| AXIA Energia Nordeste | JACARACANGA | TR 230/69 kV JACARACANGA TR1 BA | RBF | FT TR 230/69 kV JACARACANGA TR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/24/2022 | 4/1/2057 | R$17,366.93 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JACARACANGA | MG 230 kV JACARACANGA MG1 BA | RB | FT MG 230 kV JACARACANGA MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$561,480.20 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JACARACANGA | MG 230 kV JACARACANGA MG1 BA | RB | FT MG 230 kV JACARACANGA MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,575,608.31 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JACARACANGA | MG 230 kV JACARACANGA MG1 BA | RB | FT MG 230 kV JACARACANGA MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,452,518.36 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JACARACANGA | MG 230 kV JACARACANGA MG1 BA | RB | FT MG 230 kV JACARACANGA MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/2/2020 | 7/25/2040 | R$638,864.57 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JACARACANGA | MG 230 kV JACARACANGA MG1 BA | RB | FT MG 230 kV JACARACANGA MG1 BA | 061/2001 | IPCA | RBNI | DSP 4034/2021 | 12/12/2021 | 12/11/2049 | R$324,087.41 | 6/1/2025 | Ativa | Implantação de SART (composto por CLP, switch ethernet e cabos de controle) e Instalação de UTR (composto por uma Unidade Remota de Comandos, GPS e cabos de controle) em substituição à existente. Reconfiguração em bases da UTR, SAGE e relés auxiliares e adequações na fiação e cabeação dos painéis de proteção e controle. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JACARACANGA | MC 69 kV TT 69/13,8 kV JACARACANGA TA2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | MC 69 kV TT 69/13,8 kV JACARACANGA TA1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | MC 69 kV TR 69/13,8 kV JACARACANGA TR7 BA | RB | FT MG 230 kV JACARACANGA MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JACARACANGA | MC 69 kV TR 230/69 kV JACARACANGA TR3 BA | RBF | FT TR 230/69 kV JACARACANGA TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JACARACANGA | MC 69 kV TR 230/69 kV JACARACANGA TR2 BA | RBF | FT TR 230/69 kV JACARACANGA TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JACARACANGA | MC 69 kV TR 230/69 kV JACARACANGA TR2 BA | RBF | FT TR 230/69 kV JACARACANGA TR2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/14/2020 | 4/30/2051 | R$154,712.46 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JACARACANGA | MC 69 kV TR 230/69 kV JACARACANGA TR1 BA | RBF | FT TR 230/69 kV JACARACANGA TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JACARACANGA | MC 69 kV TR 230/69 kV JACARACANGA TR1 BA | RBF | FT TR 230/69 kV JACARACANGA TR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/2/2019 | 11/3/2050 | R$105,917.29 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JACARACANGA | MC 69 kV BC 69 kV 27,1 Mvar JACARACANGA BC2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | MC 69 kV BC 69 kV 27,1 Mvar JACARACANGA BC2 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | MC 69 kV BC 69 kV 27,1 Mvar JACARACANGA BC2 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/9/2018 | 5/11/2048 | R$30,731.13 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JACARACANGA | MC 230 kV TR 230/69 kV JACARACANGA TR3 BA | RBF | FT TR 230/69 kV JACARACANGA TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JACARACANGA | MC 230 kV TR 230/69 kV JACARACANGA TR3 BA | RBF | FT TR 230/69 kV JACARACANGA TR3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/21/2017 | 4/20/2050 | R$ 766.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JACARACANGA | MC 230 kV TR 230/69 kV JACARACANGA TR2 BA | RBF | FT TR 230/69 kV JACARACANGA TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JACARACANGA | MC 230 kV TR 230/69 kV JACARACANGA TR2 BA | RBF | FT TR 230/69 kV JACARACANGA TR2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/8/2021 | 9/9/2052 | R$274,509.57 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JACARACANGA | MC 230 kV TR 230/69 kV JACARACANGA TR1 BA | RBF | FT TR 230/69 kV JACARACANGA TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JACARACANGA | MC 230 kV TR 230/69 kV JACARACANGA TR1 BA | RBF | FT TR 230/69 kV JACARACANGA TR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/7/2021 | 7/27/2052 | R$234,194.54 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JACARACANGA | IB 69 kV MG 230 kV JACARACANGA MG1 BA IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | IB 69 kV MG 230 kV JACARACANGA MG1 BA IB1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$118,244.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | IB 69 kV MG 230 kV JACARACANGA MG1 BA IB1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$109,007.13 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | IB 69 kV MG 230 kV JACARACANGA MG1 BA IB1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/15/2022 | 11/14/2055 | R$72,623.17 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JACARACANGA | IB 230 kV MG 230 kV JACARACANGA MG1 BA IB1 | RB | FT MG 230 kV JACARACANGA MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,085.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JACARACANGA | IB 230 kV MG 230 kV JACARACANGA MG1 BA IB1 | RB | FT MG 230 kV JACARACANGA MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/13/2021 | 8/2/2053 | R$242,003.60 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JACARACANGA | EL 69 kV JACARACANGA DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 69 kV JACARACANGA DIST4 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 6/8/2014 | 6/10/2044 | R$7,686.18 | 6/1/2025 | Ativa | Substituição de Chave seccionadora 32J8-6.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 69 kV JACARACANGA DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 69 kV JACARACANGA DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 69 kV JACARACANGA DIST4 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/20/2022 | 8/16/2054 | R$80,716.96 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 69 kV JACARACANGA DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 69 kV JACARACANGA DIST3 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 6/8/2014 | 6/10/2044 | R$7,686.18 | 6/1/2025 | Ativa | Substituição de Chave seccionadora 32J7-6.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 69 kV JACARACANGA DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 69 kV JACARACANGA DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 69 kV JACARACANGA DIST3 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/22/2021 | 3/17/2053 | R$101,313.60 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 69 kV JACARACANGA DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 69 kV JACARACANGA DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 69 kV JACARACANGA DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 69 kV JACARACANGA DIST2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/18/2022 | 8/14/2054 | R$80,706.55 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 69 kV JACARACANGA DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 69 kV JACARACANGA DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 69 kV JACARACANGA DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 69 kV JACARACANGA DIST1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/11/2020 | 12/10/2051 | R$143,213.19 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-2 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-2 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$584,375.21 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-2 BA | DIT | 061/2001 | IPCA | RCDM | REA 5861/2016 | 2/8/2015 | 2/7/2030 | R$35,618.99 | 6/1/2025 | Ativa | REVITALIZAÇÃO NECESSÁRIA: SUBSTITUIÇÃO DE SISTEMAS DE PROTEÇÃO E PAINÉIS ASSOCIADOS EM 02 TERMINAIS DE LINHAS DE TRANSMISSÃO (LTs-04N3 04N4). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-2 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/13/2021 | 11/21/2051 | R$188,933.58 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$584,375.21 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-1 BA | DIT | 061/2001 | IPCA | RCDM | REA 5861/2016 | 2/8/2015 | 2/7/2030 | R$35,618.99 | 6/1/2025 | Ativa | REVITALIZAÇÃO NECESSÁRIA: SUBSTITUIÇÃO DE SISTEMAS DE PROTEÇÃO E PAINÉIS ASSOCIADOS EM 02 TERMINAIS DE LINHAS DE TRANSMISSÃO (LTs-04N3 04N4). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-1 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/8/2021 | 2/8/2052 | R$185,714.56 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JACARACANGA | EL 230 kV JACARACANGA LT 230 kV COTEGIPE /JACARACANGA C-1 BA | RB | FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JACARACANGA | EL 230 kV JACARACANGA LT 230 kV COTEGIPE /JACARACANGA C-1 BA | RB | FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 12/19/2015 | 12/21/2045 | R$12,477.24 | 6/1/2025 | Ativa | Substituído TPC UHC245 com vida regulatória esgotada. Posição Operacional: 84L3-B/JCR. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JACARACANGA | EL 230 kV JACARACANGA LT 230 kV COTEGIPE /JACARACANGA C-1 BA | RB | FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 12/19/2015 | 12/21/2045 | R$12,477.24 | 6/1/2025 | Ativa | Substituído TPC UHC245 com vida regulatória esgotada. Posição Operacional: 84L3-A/JCR. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JACARACANGA | EL 230 kV JACARACANGA LT 230 kV COTEGIPE /JACARACANGA C-1 BA | RB | FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/23/2022 | 5/14/2051 | R$280,407.61 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JACARACANGA | EL 230 kV JACARACANGA LT 230 kV CAMACARI IV /JACARACANGA C-2 BA | RB | FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA | 061/2001 | IPCA | RBNI | REA 2891/2011 | 8/11/2014 | 2/10/2041 | R$77,416.35 | 6/1/2025 | Ativa | T2010-076 | Adequar a proteção da EL da LT 230 kV Camaçari II/Jacaracanga- C2, devido ao remanejamento da linha para Camaçari IV *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | JACARACANGA | EL 230 kV JACARACANGA LT 230 kV CAMACARI IV /JACARACANGA C-2 BA | RB | FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JACARACANGA | EL 230 kV JACARACANGA LT 230 kV CAMACARI IV /JACARACANGA C-2 BA | RB | FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/15/2013 | 11/14/2041 | R$65,611.38 | 6/1/2025 | Ativa | Substituição do sistema de proteção da LT Camaçari II-Jacaracanga 04C4 na SE Jacaracanga, por proteção digital (retrofit) .Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JACARACANGA | EL 230 kV JACARACANGA LT 230 kV CAMACARI IV /JACARACANGA C-2 BA | RB | FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/2/2019 | 8/16/2050 | R$288,662.22 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JACARACANGA | EL 230 kV JACARACANGA LT 230 kV CAMACARI IV /JACARACANGA C-1 BA | RB | FT LT 230 kV CAMACARI IV /JACARACANGA C-1 BA | 061/2001 | IPCA | RBNI | REA 2891/2011 | 9/1/2014 | 3/3/2041 | R$77,592.67 | 6/1/2025 | Ativa | T2010-076 | Adequar a proteção da EL da LT 230 kV Camaçari II/Jacaracanga- C1, devido ao remanejamento da linha para Camaçari IV *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | JACARACANGA | EL 230 kV JACARACANGA LT 230 kV CAMACARI IV /JACARACANGA C-1 BA | RB | FT LT 230 kV CAMACARI IV /JACARACANGA C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JACARACANGA | EL 230 kV JACARACANGA LT 230 kV CAMACARI IV /JACARACANGA C-1 BA | RB | FT LT 230 kV CAMACARI IV /JACARACANGA C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/5/2019 | 11/28/2046 | R$261,790.99 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JACARACANGA | BC 69 kV 27,1 Mvar JACARACANGA BC2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$129,156.00 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JACARACANGA | BC 69 kV 27,1 Mvar JACARACANGA BC2 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/25/2022 | 4/24/2042 | R$4,936.79 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | TT 13,8/0,12 kV JACAREPAGUA TR2B RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR2B RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | TT 13,8/0,12 kV JACAREPAGUA TR1B RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR1B RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | TT 13,8/0,12 kV JACAREPAGUA TR1A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR1A RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | TR 345/138 kV JACAREPAGUA TRR2 RJ | RBF | FT TR 345/138 kV JACAREPAGUA TRR2 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$290,931.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | TR 345/138 kV JACAREPAGUA TRR1 RJ | RBF | FT TR 345/138 kV JACAREPAGUA TRR1 RJ | 062/2001 | IPCA | RMEL | REA 5457/2015 | 4/8/2016 | 9/29/2049 | R$914,778.82 | 6/1/2025 | Ativa | T2014-038 | Obra de Substituição Completa - Substituir, na SE Jacarepaguá, a a unidade reserva de autotransformador monofásico TRR1 345/138 kV - 75 MVA, que possui valor remanescente nulo, por outra unidade de autotransformador monofásico 345/138 kV - 75 MVA.(após a substituição, a receita vigente deve ser cancelada) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | JACAREPAGUA | TR 345/138 kV JACAREPAGUA TR3A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR3A RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$440,246.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | TR 345/138 kV JACAREPAGUA TR2B RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR2B RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$872,793.69 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | TR 345/138 kV JACAREPAGUA TR2B RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR2B RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,349,238.63 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | TR 345/138 kV JACAREPAGUA TR2A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR2A RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$872,793.69 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | TR 345/138 kV JACAREPAGUA TR1B RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR1B RJ | 062/2001 | IPCA | RMEL | REA 5457/2015 | 12/6/2015 | 1/26/2049 | R$ 2,720,886.87 | 6/1/2025 | Ativa | T2014-037 | Obra de Substituição Completa - Substituir, na SE Jacarepaguá, o banco de autotransformadores TR1B 345/138 kV - 3x75 MVA, que possui valor remanescente nulo, por outro banco de autotransformadores 345/138 kV - 3x75 MVA. (após a substituição, a receita vigente deve ser cancelada) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | JACAREPAGUA | TR 345/138 kV JACAREPAGUA TR1A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR1A RJ | 062/2001 | IPCA | RMEL | REA 5457/2015 | 3/27/2016 | 8/17/2049 | R$ 2,742,095.25 | 6/1/2025 | Ativa | T2014-037 | Obra de Substituição Completa - Substituir, na SE Jacarepaguá, o banco de autotransformadores TR1A 345/138 kV - 3x75 MVA, que possui valor remanescente nulo, por outro banco de autotransformadores 345/138 kV - 3x75 MVA. (após a substituição, a receita vigente deve ser cancelada) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | JACAREPAGUA | RTB 138 kV 30 Mvar JACAREPAGUA RT1 RJ | DIT | 062/2001 | IPCA | RCDMA | DSP 1173/2025 | R$972,006.54 | 6/1/2025 | Prevista | T2025-045 | Instalar, na SE JACAREPAGUA, um reator de barra trifásico RT1 138 kV - 30 Mvar. | |||||
| AXIA Energia | JACAREPAGUA | RTB 13,8 kV 30 Mvar JACAREPAGUA RT3 RJ | RBF | FT RTB 13,8 kV 30 MVAr JACAREPAGUA RT3 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$164,711.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | RTB 13,8 kV 30 Mvar JACAREPAGUA RT2 RJ | RBF | FT RTB 13,8 kV 30 Mvar JACAREPAGUA RT2 RJ | 062/2001 | IPCA | RMEL | REA 11449/2022 | 5/4/2022 | 4/13/2058 | R$931,760.52 | 6/1/2025 | Ativa | T2022-024 | Obra de Substituição Completa - Substituir na SE Jacarepaguá o reator trifásico - RT2 - 13.8 kV - 30 MVAr por outro de 30 MVAr. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | JACAREPAGUA | RTB 13,8 kV 30 Mvar JACAREPAGUA RT1 RJ | RBF | FT RTB 13,8 kV 30 MVAr JACAREPAGUA RT1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$164,711.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MG 345 kV JACAREPAGUA MG1 RJ | RB | FT MG 345 kV JACAREPAGUA MG1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,089,472.12 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MG 345 kV JACAREPAGUA MG1 RJ | RB | FT MG 345 kV JACAREPAGUA MG1 RJ | 062/2001 | IPCA | RBNI | REA 5710/2016 | 9/18/2019 | 12/21/2048 | R$543,378.60 | 6/1/2025 | Ativa | T2016-011 | Adequação do Módulo de Infraestrutura Geral da SE Jacarepaguá. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | JACAREPAGUA | MG 345 kV JACAREPAGUA MG1 RJ | RB | FT MG 345 kV JACAREPAGUA MG1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,180,715.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MG 345 kV JACAREPAGUA MG1 RJ | RB | FT MG 345 kV JACAREPAGUA MG1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 4,481,950.81 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MG 345 kV JACAREPAGUA MG1 RJ | RB | FT MG 345 kV JACAREPAGUA MG1 RJ | 062/2001 | IPCA | RBNI | REN 443/2011 | 12/13/2016 | 7/11/2045 | R$103,268.99 | 6/1/2025 | Ativa | Instalação de Módulo de Infraestrutura de Manobra - MIM associado à Entrada de linha para Curicica I * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MG 345 kV JACAREPAGUA MG1 RJ | RB | FT MG 345 kV JACAREPAGUA MG1 RJ | 062/2001 | IPCA | RBNI | REA 4347/2013 | 2/22/2017 | 11/20/2045 | R$103,798.11 | 6/1/2025 | Ativa | Instalação de Módulo de Infraestrutura de Manobra - MIM associado à Entrada de linha para Curicica II * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MG 345 kV JACAREPAGUA MG1 RJ | RB | FT MG 345 kV JACAREPAGUA MG1 RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/31/2017 | 3/27/2033 | R$161,418.32 | 6/1/2025 | Ativa | Aquisição de servidores de processo e dados históricos de alta capacidade de armazenamento e processamento. Visa automatização de análise e diagnósticos dos sistemas de supervisão e monitoramento. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MG 345 kV JACAREPAGUA MG1 RJ | RB | FT MG 345 kV JACAREPAGUA MG1 RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/31/2017 | 3/27/2033 | R$ 323.50 | 6/1/2025 | Ativa | Substituição de IHMs do Sistema de Supervisão e Controle Local (SAGE) por obsolescência ou por atualização tecnológica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MG 345 kV JACAREPAGUA MG1 RJ | RB | FT MG 345 kV JACAREPAGUA MG1 RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 10/5/2015 | 10/4/2028 | R$6,723.97 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (012282/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MG 345 kV JACAREPAGUA MG1 RJ | RB | FT MG 345 kV JACAREPAGUA MG1 RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 10/5/2015 | 10/4/2028 | R$6,723.97 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (004260/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MG 345 kV JACAREPAGUA MG1 RJ | RB | FT MG 345 kV JACAREPAGUA MG1 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 9/24/2017 | 8/12/2038 | R$851,416.81 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MG 345 kV JACAREPAGUA MG1 RJ | RB | FT MG 345 kV JACAREPAGUA MG1 RJ | 062/2001 | IPCA | RBNIA | DSP 1173/2025 | R$126,699.59 | 6/1/2025 | Prevista | T2025-045 | Módulo de infraestrutura em 138 kV, arranjo BD5, associado ao1º reator de barra trifásico na SE Jacarepaguá | ||||
| AXIA Energia | JACAREPAGUA | MC 345 kV TR 345/138 kV JACAREPAGUA TR3A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR3A RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 345 kV TR 345/138 kV JACAREPAGUA TR3A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR3A RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 7/20/2015 | 4/12/2041 | R$26,434.14 | 6/1/2025 | Ativa | Substituição da proteção diferencial de barras por proteção adaptativa Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MC 345 kV TR 345/138 kV JACAREPAGUA TR2B RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR2B RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 345 kV TR 345/138 kV JACAREPAGUA TR2B RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR2B RJ | 062/2001 | IPCA | RMEL | REN 643/2014 | 3/22/2015 | 8/13/2042 | R$97,191.30 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 3 seccionadoras s/LTC PMI 2014-2017 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MC 345 kV TR 345/138 kV JACAREPAGUA TR2B RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR2B RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 7/20/2015 | 4/12/2041 | R$21,980.11 | 6/1/2025 | Ativa | Substituição da proteção diferencial de barras por proteção adaptativa Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MC 345 kV TR 345/138 kV JACAREPAGUA TR2B RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR2B RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 7/15/2014 | 4/9/2035 | R$26,218.47 | 6/1/2025 | Ativa | Substituição 3 para-raios no vão do banco de autotransformadores AT2B - Nº Oper:PR345AT2B - PMI (005999/2015) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MC 345 kV TR 345/138 kV JACAREPAGUA TR2B RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR2B RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/25/2021 | 8/27/2051 | R$409,197.75 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MC 345 kV TR 345/138 kV JACAREPAGUA TR2A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR2A RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 345 kV TR 345/138 kV JACAREPAGUA TR2A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR2A RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 7/20/2015 | 4/12/2041 | R$21,980.11 | 6/1/2025 | Ativa | Substituição da proteção diferencial de barras por proteção adaptativa Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MC 345 kV TR 345/138 kV JACAREPAGUA TR2A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR2A RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 2/17/2021 | 8/3/2051 | R$603,886.37 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MC 345 kV TR 345/138 kV JACAREPAGUA TR1B RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR1B RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 345 kV TR 345/138 kV JACAREPAGUA TR1B RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR1B RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 7/20/2015 | 4/12/2041 | R$21,980.11 | 6/1/2025 | Ativa | Substituição da proteção diferencial de barras por proteção adaptativa Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MC 345 kV TR 345/138 kV JACAREPAGUA TR1B RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR1B RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,046,877.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 345 kV TR 345/138 kV JACAREPAGUA TR1B RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR1B RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,122,309.01 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 345 kV TR 345/138 kV JACAREPAGUA TR1B RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR1B RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/21/2021 | 3/28/2050 | R$373,967.61 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MC 345 kV TR 345/138 kV JACAREPAGUA TR1A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR1A RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 345 kV TR 345/138 kV JACAREPAGUA TR1A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR1A RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 7/20/2015 | 4/12/2041 | R$21,980.11 | 6/1/2025 | Ativa | Substituição da proteção diferencial de barras por proteção adaptativa Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MC 345 kV TR 345/138 kV JACAREPAGUA TR1A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR1A RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,046,877.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 345 kV TR 345/138 kV JACAREPAGUA TR1A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR1A RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,122,309.01 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 345 kV TR 345/138 kV JACAREPAGUA TR1A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR1A RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/17/2021 | 2/1/2050 | R$352,921.84 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MC 138 kV TR 345/138 kV JACAREPAGUA TR3A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR3A RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,609.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 138 kV TR 345/138 kV JACAREPAGUA TR2B RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR2B RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,609.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 138 kV TR 345/138 kV JACAREPAGUA TR2B RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR2B RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$443,638.10 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 138 kV TR 345/138 kV JACAREPAGUA TR2B RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR2B RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$475,603.79 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 138 kV TR 345/138 kV JACAREPAGUA TR2B RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR2B RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/23/2018 | 12/22/2033 | R$8,896.25 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MC 138 kV TR 345/138 kV JACAREPAGUA TR2A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR2A RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,609.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 138 kV TR 345/138 kV JACAREPAGUA TR2A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR2A RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$443,638.10 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 138 kV TR 345/138 kV JACAREPAGUA TR2A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR2A RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$475,603.79 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 138 kV TR 345/138 kV JACAREPAGUA TR2A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR2A RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/6/2015 | 1/29/2038 | R$9,377.65 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARARAIOS LADO 138 KV AT2A FASE B - Nº Oper: PR138AT2AB - PMI (007434/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MC 138 kV TR 345/138 kV JACAREPAGUA TR2A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR2A RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/6/2015 | 1/29/2038 | R$9,377.65 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARARAIOS LADO 138 KV AT2A FASE A - Nº Oper: PR138AT2AA - PMI (007442/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MC 138 kV TR 345/138 kV JACAREPAGUA TR2A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR2A RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/6/2015 | 1/29/2038 | R$9,377.65 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARARAIOS LADO 138 KV AT2A FASE C - Nº Oper: PR138AT2AC - PMI (007443/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MC 138 kV TR 345/138 kV JACAREPAGUA TR2A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR2A RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/23/2021 | 7/21/2048 | R$74,627.70 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MC 138 kV TR 345/138 kV JACAREPAGUA TR1B RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR1B RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,609.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 138 kV TR 345/138 kV JACAREPAGUA TR1B RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR1B RJ | 062/2001 | IPCA | RBNI | REA 5710/2016 | 10/9/2018 | 3/16/2050 | R$354,649.91 | 6/1/2025 | Ativa | T2016-011 | Adequação com substituição de 1 disjuntor, 5 chaves seccionadoras, 3 transformadores de corrente e 1 transformador de potencial capacitivo no módulo de conexão do banco de autotransformador AT1B, em 138 kV, arranjo barra dupla 5 chaves, na SE Jacarepaguá. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | JACAREPAGUA | MC 138 kV TR 345/138 kV JACAREPAGUA TR1B RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR1B RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/23/2018 | 12/22/2033 | R$17,792.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MC 138 kV TR 345/138 kV JACAREPAGUA TR1A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR1A RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,609.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 138 kV TR 345/138 kV JACAREPAGUA TR1A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR1A RJ | 062/2001 | IPCA | RBNI | REA 5710/2016 | 8/16/2019 | 1/21/2051 | R$363,459.11 | 6/1/2025 | Ativa | T2016-011 | Adequação com substituição de 1 disjuntor, 5 chaves seccionadoras, 3 transformadores de corrente e 1 transformador de potencial capacitivo no módulo de conexão do banco de autotransformador AT1A, em 138 kV, arranjo barra dupla 5 chaves, na SE Jacarepaguá. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | JACAREPAGUA | MC 138 kV TR 345/138 kV JACAREPAGUA TR1A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR1A RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/23/2018 | 12/22/2033 | R$17,792.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MC 138 kV RTB 138 kV 30 Mvar JACAREPAGUA RT1 RJ | DIT | 062/2001 | IPCA | RCDMA | DSP 1173/2025 | R$ 1,220,628.46 | 6/1/2025 | Prevista | T2025-045 | Instalar, na SE JACAREPAGUA, um módulo de conexão com disjuntor, em 138kV,para o reator de barra RT1 138kV - 30 Mvar. | |||||
| AXIA Energia | JACAREPAGUA | MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1B RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$105,211.38 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | JACAREPAGUA | MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1B RJ | DIT | 062/2001 | IPCA | RCDM | REA 5710/2016 | 1/24/2019 | 4/4/2051 | R$190,847.31 | 6/1/2025 | Ativa | T2016-011 | Adequação com substituição de 1 disjuntor e 3 transformadores de corrente no módulo de conexão do banco de capacitores C1B, em 138 kV, arranjo barra dupla 5 chaves, na SE Jacarepaguá. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1B RJ | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 4/10/2015 | 10/2/2042 | R$22,604.50 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de1 seccionadoras s/LTC. Melhoria incluída no reajuste do ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1B RJ | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 4/12/2015 | 10/4/2042 | R$32,766.82 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 1 seccionadoras c/LTC PMI 2014-2017 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1B RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/23/2018 | 12/22/2033 | R$17,792.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$118,248.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | JACAREPAGUA | MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ | DIT | 062/2001 | IPCA | RCDM | REA 5710/2016 | 1/18/2019 | 3/29/2051 | R$190,758.89 | 6/1/2025 | Ativa | T2016-011 | Adequação com substituição de 1 disjuntor e 3 transformadores de corrente no módulo de conexão do banco de capacitores C1A, em 138 kV, arranjo barra dupla 5 chaves, na SE Jacarepaguá. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 4/9/2015 | 10/1/2042 | R$22,602.21 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 1 seccionadoras s/LTC (6517) PMI 2014-2017 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 2/8/2015 | 6/2/2042 | R$22,458.52 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 1 seccionadoras s/LTC (6717) PMI 2014-2017 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 12/7/2014 | 1/29/2042 | R$22,305.66 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 1 seccionadora (SC6511C - vãos dos bancos) PMI 2014-2017 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 12/21/2014 | 2/12/2042 | R$22,338.27 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 1 seccionadora (SC6513C - vãos dos bancos) PMI 2014-2017 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/14/2017 | 2/2/2039 | R$42,507.75 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | MC 13,8 kV TT 13,8/0,12 kV JACAREPAGUA TR2B RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR2B RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 13,8 kV TT 13,8/0,12 kV JACAREPAGUA TR1B RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR1B RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 13,8 kV TT 13,8/0,12 kV JACAREPAGUA TR1A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR1A RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 13,8 kV TR 345/138 kV JACAREPAGUA TR3A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR3A RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,629.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 13,8 kV TR 345/138 kV JACAREPAGUA TR2A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR2A RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,629.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 13,8 kV TR 345/138 kV JACAREPAGUA TR1B RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR1B RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,629.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 13,8 kV TR 345/138 kV JACAREPAGUA TR1A RJ | RBF | FT TR 345/138 kV JACAREPAGUA TR1A RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,629.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 13,8 kV RTB 13,8 kV 30 Mvar JACAREPAGUA RT3 RJ | RBF | FT RTB 13,8 kV 30 MVAr JACAREPAGUA RT3 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,744.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 13,8 kV RTB 13,8 kV 30 Mvar JACAREPAGUA RT2 RJ | RBF | FT RTB 13,8 kV 30 Mvar JACAREPAGUA RT2 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,744.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | MC 13,8 kV RTB 13,8 kV 30 Mvar JACAREPAGUA RT1 RJ | RBF | FT RTB 13,8 kV 30 MVAr JACAREPAGUA RT1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,744.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | IB 345 kV MG 345 kV JACAREPAGUA MG1 RJ IB1 | RB | FT MG 345 kV JACAREPAGUA MG1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | IB 345 kV MG 345 kV JACAREPAGUA MG1 RJ IB1 | RB | FT MG 345 kV JACAREPAGUA MG1 RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 7/20/2015 | 4/12/2041 | R$26,434.14 | 6/1/2025 | Ativa | Substituição da proteção diferencial de barras por proteção adaptativa Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | IB 345 kV MG 345 kV JACAREPAGUA MG1 RJ IB1 | RB | FT MG 345 kV JACAREPAGUA MG1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$928,957.53 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | IB 345 kV MG 345 kV JACAREPAGUA MG1 RJ IB1 | RB | FT MG 345 kV JACAREPAGUA MG1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$995,892.20 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | IB 345 kV MG 345 kV JACAREPAGUA MG1 RJ IB1 | RB | FT MG 345 kV JACAREPAGUA MG1 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/3/2018 | 3/4/2037 | R$109,027.96 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | JACAREPAGUA | IB 138 kV MG 345 kV JACAREPAGUA MG1 RJ IB4 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$92,690.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | JACAREPAGUA | IB 138 kV MG 345 kV JACAREPAGUA MG1 RJ IB3 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$92,690.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | JACAREPAGUA | IB 138 kV MG 345 kV JACAREPAGUA MG1 RJ IB2 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$92,690.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | JACAREPAGUA | IB 138 kV MG 345 kV JACAREPAGUA MG1 RJ IB2 | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/23/2018 | 12/22/2033 | R$71,169.92 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | IB 138 kV MG 345 kV JACAREPAGUA MG1 RJ IB1 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$92,690.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | JACAREPAGUA | IB 138 kV MG 345 kV JACAREPAGUA MG1 RJ IB1 | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/23/2018 | 12/22/2033 | R$71,169.92 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 345 kV JACAREPAGUA LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ | RB | FT LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | EL 345 kV JACAREPAGUA LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ | RB | FT LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 7/20/2015 | 4/12/2041 | R$21,674.76 | 6/1/2025 | Ativa | Substituição da proteção diferencial de barras por proteção adaptativa Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | EL 345 kV JACAREPAGUA LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ | RB | FT LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ | 062/2001 | IPCA | RMEL | REN 643/2014 | 7/12/2015 | 4/5/2037 | R$27,605.55 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 3 para-raios. Melhoria incluída na análise do recurso do ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | EL 345 kV JACAREPAGUA LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ | RB | FT LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/29/2020 | 9/22/2046 | R$326,320.09 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | JACAREPAGUA | EL 345 kV JACAREPAGUA LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ | RB | FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | JACAREPAGUA | EL 345 kV JACAREPAGUA LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ | RB | FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ | 062/2001 | IPCA | RBNI | REA 3578/2012 | 7/20/2015 | 4/12/2041 | R$21,674.76 | 6/1/2025 | Ativa | Substituição da proteção diferencial de barras por proteção adaptativa Reforço incluído no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | EL 345 kV JACAREPAGUA LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ | RB | FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/20/2016 | 2/9/2042 | R$66,217.24 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV ZONA OESTE /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV ZONA OESTE /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/23/2020 | 12/12/2040 | R$156,260.04 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV VILA VALQUEIR /JACAREPAGUA C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV VILA VALQUEIR /JACAREPAGUA C-2 RJ | DIT | 062/2001 | IPCA | RCDM | REA 5710/2016 | 10/23/2019 | 1/10/2051 | R$320,470.69 | 6/1/2025 | Ativa | T2016-011 | Adequação com substituição de 1 disjuntor, 5 chaves seccionadoras, 3 transformadores de corrente e 1 transformador de potencial capacitivo no módulo de entrada de linha, saída para Vila Valqueire 2, 138 kV, arranjo barra dupla 5 chaves, na SE Jacarepaguá. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV VILA VALQUEIR /JACAREPAGUA C-2 RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/10/2014 | 12/4/2035 | R$3,732.73 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LIVVJP2 FASE C - Nº Oper: NA - PMI (007480/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV VILA VALQUEIR /JACAREPAGUA C-2 RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/20/2017 | 9/4/2035 | R$28,805.87 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV VILA VALQUEIR /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV VILA VALQUEIR /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RCDM | REA 5710/2016 | 1/11/2019 | 4/28/2050 | R$292,989.43 | 6/1/2025 | Ativa | T2016-011 | Adequação com substituição de 1 disjuntor, 5 chaves seccionadoras, 3 transformadores de corrente e 1 transformador de potencial capacitivo no módulo de entrada de linha, saída para Vila Valqueire 1, 138 kV, arranjo barra dupla 5 chaves, na SE Jacarepaguá. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV VILA VALQUEIR /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/1/2018 | 1/14/2040 | R$55,106.00 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ | DIT | 062/2001 | IPCA | RCDM | REA 5710/2016 | 5/16/2019 | 1/23/2051 | R$245,451.48 | 6/1/2025 | Ativa | T2016-011 | Adequação com substituição de 1 disjuntor, 2 chaves seccionadoras, 3 transformadores de corrente e 1 transformador de potencial capacitivo no módulo de entrada de linha, saída para Terminal Sul 2, 138 kV, arranjo barra dupla 5 chaves, na SE Jacarepaguá. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 1/25/2015 | 4/18/2042 | R$44,202.21 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 2 seccionadoras s/LTC PMI 2014-2017 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 2/22/2015 | 6/16/2042 | R$32,127.37 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 1 seccionadora c/LTC PMI 2014-2017 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/3/2014 | 1/27/2036 | R$3,745.44 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LITSJP2 FASES A - Nº Oper: NA - PMI (007477/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/3/2014 | 1/27/2036 | R$3,745.44 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LITSJP2 FASES B - Nº Oper: NA - PMI (007478/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/3/2014 | 1/27/2036 | R$3,745.44 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LITSJP2 FASES C - Nº Oper: NA - PMI (007479/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/10/2018 | 11/13/2035 | R$61,359.99 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RCDM | REA 5710/2016 | 10/23/2019 | 7/2/2051 | R$248,461.18 | 6/1/2025 | Ativa | T2016-011 | Adequação com substituição de 1 disjuntor, 2 chaves seccionadoras, 3 transformadores de corrente e 1 transformador de potencial capacitivo no módulo de entrada de linha, saída para Terminal Sul 1, 138 kV, arranjo barra dupla 5 chaves, na SE Jacarepaguá. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 3/1/2015 | 6/23/2042 | R$44,367.72 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 2 seccionadoras s/LTC PMI 2014-2017 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 7/26/2015 | 4/18/2043 | R$32,648.17 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição de 1 seccionadora c/LTC PMI 2014-2017 Incluída no reajuste 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/6/2014 | 11/30/2035 | R$3,730.69 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LITSJP1 FASES A - Nº Oper: NA - PMI (007474/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/6/2014 | 11/30/2035 | R$3,730.69 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LITSJP1 FASES B - Nº Oper: NA - PMI (007475/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/6/2014 | 11/30/2035 | R$3,730.69 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LITSJP1 FASES C - Nº Oper: NA - PMI (007476/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/12/2019 | 11/22/2034 | R$45,467.23 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ZONA INDUSTR. C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ZONA INDUSTR. C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/2/2014 | 12/26/2035 | R$3,743.98 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LIJPZN STJP FASE B - Nº Oper: NA - PMI (007472/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ZONA INDUSTR. C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/2/2014 | 12/26/2035 | R$3,743.98 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LIJPZN STJP FASE C - Nº Oper: NA - PMI (007473/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ZONA INDUSTR. C-1 RJ | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 3/8/2021 | 3/7/2054 | R$140,912.99 | 6/1/2025 | Ativa | Substituição de DISJUNTORES SUPERADOS: LT ZIN * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ZONA INDUSTR. C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/31/2023 | 2/2/2053 | R$85,090.13 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /PALMARES C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /PALMARES C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 2/11/2015 | 6/6/2036 | R$3,782.75 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARARAIO LIJPPP STJP FASE A - Nº Oper: PR6090T A - PMI (007469/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /PALMARES C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 2/11/2015 | 6/6/2036 | R$3,782.75 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARARAIO LIJPPP STJP FASE B - Nº Oper: PR609OT B - PMI (007470/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /PALMARES C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 2/11/2015 | 6/6/2036 | R$3,782.75 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARARAIO LIJPPP STJP FASE C - Nº Oper: PR6090T C - PMI (007471/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /PALMARES C-1 RJ | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 3/8/2021 | 3/7/2054 | R$140,912.99 | 6/1/2025 | Ativa | (Substituição) DISJUNTORES SUPERADOS: LT Palmares * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /MATO ALTO C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /MATO ALTO C-1 RJ | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 9/10/2015 | 8/2/2046 | R$116,959.71 | 6/1/2025 | Ativa | Substituição de disjuntores superados no vão LT Mato Alto INCLUÍDA NO CICLO 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /MATO ALTO C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/17/2020 | 7/16/2049 | R$100,754.00 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /COSMOS C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /COSMOS C-1 RJ | DIT | 062/2001 | IPCA | RCDM | REA 2837/2011 | 9/10/2015 | 10/29/2044 | R$241,657.24 | 6/1/2025 | Ativa | Superação de vão de linha existente por corrente de carga, divididos da seguinte forma: Vão Cosmos - 1 disjuntor (DJ6068), 5 Chaves Seccionadoras, 3 TC, 1 TPC e 1 BB. No cálculo da RAP foi considerada a data informada pela transmissora (01/12/2013). RAP cadastrada como prevista em função da ausência de Termo de Liberação.CLASSIFICADA COMO ATIVA NO CICLO 16/17 CONFORME TL *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /COSMOS C-1 RJ | DIT | 062/2001 | IPCA | RCDM | REA 2837/2011 | 9/10/2015 | 8/5/2033 | R$16,925.03 | 6/1/2025 | Ativa | Superação de 2 vão de linhas existentes por corrente de carga, divididos da seguinte forma: Vão Cosmos - 1 bobina de bloqueio CLASSIFICADA COMO ATIVA NO CICLO 16/17 CONFORME TL *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /COSMOS C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/30/2014 | 12/24/2035 | R$8,919.52 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LIJPCO STJP FASE A - Nº Oper: NA - PMI (007466/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /COSMOS C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/30/2014 | 12/24/2035 | R$8,919.52 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LIJPCO STJP FASE B - Nº Oper: NA - PMI (007467/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /COSMOS C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/30/2014 | 12/24/2035 | R$8,919.52 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LIJPCO STJP FASE C - Nº Oper: NA - PMI (007468/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ARI FRANCO C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ARI FRANCO C-1 RJ | DIT | 062/2001 | IPCA | RCDM | REA 2837/2011 | 9/10/2015 | 8/3/2043 | R$112,776.73 | 6/1/2025 | Ativa | Substituição de 5 chaves secionadoras. No cálculo da RAP foi considerada a data informada pela transmissora (22/12/2013). RAP cadastrada como prevista em função da ausência de Termo de Liberação. CLASSIFICADA COMO ATIVA NO CICLO 16-17 CONFORME TL *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ARI FRANCO C-1 RJ | DIT | 062/2001 | IPCA | RCDM | REA 2837/2011 | 9/10/2015 | 8/5/2033 | R$16,925.03 | 6/1/2025 | Ativa | Superação de 2 vão de linhas existentes por corrente de carga, divididos da seguinte forma: Vão Ari Franco - 1 bobina de bloqueio Ativada no ciclo 2016/2017, conforme TL *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ARI FRANCO C-1 RJ | DIT | 062/2001 | IPCA | RCDM | REA 5710/2016 | 9/4/2019 | 9/6/2049 | R$151,024.99 | 6/1/2025 | Ativa | T2016-011 | Adequação com substituição de 3 transformadores de corrente no módulo de entrada de linha, saída para Ari Franco, 138 kV, arranjo barra dupla 5 chaves, na SE Jacarepaguá. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ARI FRANCO C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$647,926.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ARI FRANCO C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$694,611.89 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ARI FRANCO C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 4/30/2015 | 4/29/2039 | R$33,040.18 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-2 RJ | DIT | 062/2001 | IPCA | RCDM | REA 5710/2016 | 12/17/2018 | 3/22/2049 | R$61,139.68 | 6/1/2025 | Ativa | T2016-011 | Adequação com substituição de 3 transformadores de corrente no módulo de entrada de linha, saída para Itapeba 2, 138 kV, arranjo barra dupla 5 chaves, na SE Jacarepaguá. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-2 RJ | DIT | 062/2001 | IPCA | RCDM | REA 2837/2011 | 9/10/2015 | 9/29/2044 | R$241,439.67 | 6/1/2025 | Ativa | Substituição de módulo de entrada de linha em 138 kV para Itapeba circuito 2, com a substituição de disjuntor, 5 chaves, 3 PR e 3 TP. INCLUÍDA NO CICLO 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-2 RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/19/2014 | 12/13/2035 | R$3,737.34 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LIIEJP2 FASES A - Nº Oper: NA - PMI (007463/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-2 RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/19/2014 | 12/13/2035 | R$3,737.34 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LIIEJP2 FASES B - Nº Oper: NA - PMI (007464/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-2 RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/19/2014 | 12/13/2035 | R$3,737.34 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LIIEJP2 FASES C - Nº Oper: NA - PMI (007465/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-2 RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/23/2018 | 12/22/2033 | R$17,792.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RCDM | REA 2837/2011 | 9/10/2015 | 9/29/2044 | R$241,439.67 | 6/1/2025 | Ativa | Substituição de módulo de entrada de linha em 138 kV para Itapeba circuito 1. No cálculo da RAP foi considerada substituição de disjuntor, 5 chaves, 3 PR e 3 TP. Receita cadastrada no ciclo 16/17. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RCDM | REA 5710/2016 | 12/17/2018 | 3/25/2049 | R$61,142.43 | 6/1/2025 | Ativa | T2016-011 | Adequação com substituição de 3 transformadores de corrente no módulo de entrada de linha, saída para Itapeba 1, 138 kV, arranjo barra dupla 5 chaves, na SE Jacarepaguá. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/14/2014 | 2/7/2036 | R$3,751.04 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LIIEJP1 FASES A - Nº Oper: NA - PMI (007460/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/14/2014 | 2/7/2036 | R$3,751.04 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LIIEJP1 FASES B - Nº Oper: NA - PMI (007461/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/14/2014 | 2/7/2036 | R$3,751.04 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS LIIEJP1 FASES C - Nº Oper: NA - PMI (007462/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/23/2018 | 12/22/2033 | R$17,792.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV GRAJAU /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV GRAJAU /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RCDM | REA 5710/2016 | 9/27/2018 | 1/19/2050 | R$308,104.76 | 6/1/2025 | Ativa | T2016-011 | Adequação com substituição de 1 disjuntor, 5 chaves seccionadoras, 3 transformadores de corrente e 1 transformador de potencial capacitivo no módulo de entrada de linha, saída para Grajaú, 138 kV, arranjo barra dupla 5 chaves, na SE Jacarepaguá. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV GRAJAU /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/7/2018 | 1/31/2039 | R$48,731.84 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV CASCADURA /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$168,846.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV CASCADURA /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RCDM | REA 5710/2016 | 1/24/2019 | 5/18/2050 | R$311,127.55 | 6/1/2025 | Ativa | T2016-011 | Adequação com substituição de 1 disjuntor, 5 chaves seccionadoras, 3 transformadores de corrente e 1 transformador de potencial capacitivo no módulo de entrada de linha, saída para Cascadura, 138 kV, arranjo barra dupla 5 chaves, na SE Jacarepaguá. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV CASCADURA /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/5/2015 | 7/28/2036 | R$3,794.61 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARARAIOS LTCDJP FASE A - Nº Oper: PR6160T A - PMI (007484/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV CASCADURA /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/5/2015 | 7/28/2036 | R$3,794.61 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARARAIOS LTCDJP FASE B - Nº Oper: PR6160T B - PMI (007485/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA LT 138 kV CASCADURA /JACAREPAGUA C-1 RJ | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/21/2018 | 12/26/2035 | R$32,614.99 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA CURICICA II | DIT | 062/2001 | IPCA | RCDM | REN 443/2011 | 12/13/2016 | 9/23/2047 | R$884,085.30 | 6/1/2025 | Ativa | Instalação de Entrada de linha para Curicica II * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA CURICICA II | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/23/2018 | 12/22/2033 | R$118,616.53 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA CURICICA I | DIT | 062/2001 | IPCA | RCDM | REN 443/2011 | 12/13/2016 | 9/21/2047 | R$867,756.18 | 6/1/2025 | Ativa | Instalação de Entrada de linha para Curicica I * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | EL 138 kV JACAREPAGUA CURICICA I | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/23/2018 | 12/22/2033 | R$118,616.53 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | JACAREPAGUA | BC 138 kV 100 Mvar JACAREPAGUA BC1B RJ | DIT | 062/2001 | IPCA | RMEL | REA 11449/2022 | 5/4/2022 | 6/18/2039 | R$531,059.13 | 6/1/2025 | Ativa | T2022-022 | Obra de Substituição Completa - Substituir na SE Jacarepaguá o banco de capacitores de derivação - BC1B - 138 kV - 100 MVAr por outro de 100 MVAr. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | JACAREPAGUA | BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ | DIT | 062/2001 | IPCA | RMEL | REA 11449/2022 | 5/4/2022 | 1/26/2041 | R$520,533.62 | 6/1/2025 | Ativa | T2022-023 | Obra de Substituição Completa - Substituir na SE Jacarepaguá o banco de capacitores de derivação - BC1A - 138 kV - 100 MVAr por outro de 100 MVAr. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JAGUARARI-SE | MG 230 kV JAGUARARI-SE MG1 BA | RB | FT MG 230 kV JAGUARARI-SE MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$398,787.86 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JAGUARARI-SE | MG 230 kV JAGUARARI-SE MG1 BA | RB | FT MG 230 kV JAGUARARI-SE MG1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 8/30/2016 | 8/29/2033 | R$8,084.78 | 6/1/2025 | Ativa | Implantação de Banco de Baterias * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JAGUARARI-SE | MG 230 kV JAGUARARI-SE MG1 BA | RB | FT MG 230 kV JAGUARARI-SE MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/10/2021 | 1/31/2039 | R$287,617.77 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JAGUARARI-SE | MC 230 kV 04T2 M CARAIBA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JAGUARARI-SE | MC 230 kV 04T2 M CARAIBA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/2/2021 | 4/1/2046 | R$34,888.51 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JAGUARARI-SE | MC 230 kV 04T1 M CARAIBA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JAGUARARI-SE | MC 230 kV 04T1 M CARAIBA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/26/2021 | 11/9/2043 | R$36,685.10 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JAGUARARI-SE | IB 230 kV MG 230 kV JAGUARARI-SE MG1 BA IB1 | RB | FT MG 230 kV JAGUARARI-SE MG1 BA | 061/2001 | IPCA | RBNI | REA 2173/2009 | 9/27/2012 | 9/1/2045 | R$728,520.98 | 6/1/2025 | Ativa | T2009-152 | Instalar um módulo de interligação de barramentos 230 kV. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | JAGUARARI-SE | EL 230 kV JAGUARARI-SE LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA | RB | FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA | 061/2001 | IPCA | RBNI | REA 2173/2009 | 9/27/2012 | 2/18/2043 | R$334,405.46 | 6/1/2025 | Ativa | T2009-152 | Adequar a entrada de linha 230 kV da SE Jaguarari para SE Juazeiro II, complementando este módulo com 1 disjuntor e duas chaves seccionadoras. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | JAGUARARI-SE | EL 230 kV JAGUARARI-SE LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA | RB | FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JAGUARARI-SE | EL 230 kV JAGUARARI-SE LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA | RB | FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/2/2022 | 5/1/2037 | R$5,762.75 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JAGUARARI-SE | EL 230 kV JAGUARARI-SE LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA | RB | FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA | 061/2001 | IPCA | RBNI | REA 2173/2009 | 9/27/2012 | 2/18/2043 | R$334,405.46 | 6/1/2025 | Ativa | T2009-152 | Adequar a entrada de linha 230 kV da SE Jaguarari para SE Senhor do Bonfim II, complementando este módulo com 1 disjuntor e duas chaves seccionadoras. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | JAGUARARI-SE | EL 230 kV JAGUARARI-SE LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA | RB | FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| JANAPU | JANAUBA 6 | RTL 500 kV 78,33 Mvar JANAUBA 6 RTR3 MG | RB | FT RTL 500 kV 78,33 Mvar JANAUBA 6 RTR3 MG | 009/2023 | IPCA | RBL | CC 009/2023 | R$577,223.44 | 6/1/2025 | Prevista | T2023-182 | |||||
| JANAPU | JANAUBA 6 | RTL 500 kV 235 Mvar JANAUBA 6 RT4 MG | RB | FT LT 500 kV JANAUBA 6 /PRESIDENTE JUSCELINO C-1 MG | 009/2023 | IPCA | RBL | CC 009/2023 | R$ 1,731,670.33 | 6/1/2025 | Prevista | T2023-182 | |||||
| JANAPU | JANAUBA 6 | MC 500 kV RTL 500 kV 235 Mvar JANAUBA 6 RT4 MG | RB | FT LT 500 kV JANAUBA 6 /PRESIDENTE JUSCELINO C-1 MG | 009/2023 | IPCA | RBL | CC 009/2023 | R$313,902.39 | 6/1/2025 | Prevista | T2023-182 | |||||
| JANAPU | JANAUBA 6 | EL 500 kV JANAUBA 6 LT 500 kV JANAUBA 6 /PRESIDENTE JUSCELINO C-1 MG | RB | FT LT 500 kV JANAUBA 6 /PRESIDENTE JUSCELINO C-1 MG | 009/2023 | IPCA | RBL | CC 009/2023 | R$ 1,522,414.94 | 6/1/2025 | Prevista | T2023-182 | |||||
| AXIA Energia Nordeste | JARDIM | TT 69/13,8 kV JARDIM TA2 SE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | TT 69/13,8 kV JARDIM TA2 SE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$248,222.69 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | TT 69/13,8 kV JARDIM TA2 SE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$228,831.00 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | TT 69/13,8 kV JARDIM TA1 SE | DIT | 061/2001 | IPCA | RCDM | REA 3578/2012 | 1/31/2016 | 9/28/2046 | R$182,825.58 | 6/1/2025 | Ativa | Obra de Substituição Completa - Substituição de 1 transformador de aterramento: 02A1. INCLUIDA NO CICLO 2016/2017 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | JARDIM | TR 69/13,8 kV JARDIM TR5 SE | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | TR 69/13,8 kV JARDIM TR5 SE | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$76,466.27 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | TR 69/13,8 kV JARDIM TR5 SE | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$70,492.55 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | TR 500/230 kV JARDIM TRR1 SE | RB | FT TR 500/230 kV JARDIM TRR1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$622,465.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | TR 500/230 kV JARDIM TRR1 SE | RB | FT TR 500/230 kV JARDIM TRR1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,746,742.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | TR 500/230 kV JARDIM TRR1 SE | RB | FT TR 500/230 kV JARDIM TRR1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,610,282.76 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | TR 500/230 kV JARDIM TR8 SE | RB | FT TR 500/230 kV JARDIM TR8 SE | 061/2001 | IPCA | RBNI | REA 5225/2015 | 12/17/2017 | 2/15/2053 | R$ 5,211,281.16 | 6/1/2025 | Ativa | T2015-028 | Instalação de Autotransformadores Monofásicos, 500/230/13,8 kV, 3X200 MVA, na Subestação Jardim. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | JARDIM | TR 500/230 kV JARDIM TR8 SE | RB | FT TR 500/230 kV JARDIM TR8 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/12/2021 | 11/19/2056 | R$5,803.41 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | TR 500/230 kV JARDIM TR7 SE | RB | FT TR 500/230 kV JARDIM TR7 SE | 061/2001 | IPCA | RBNI | REA 2181/2009 | 12/17/2012 | 2/16/2048 | R$ 4,617,089.33 | 6/1/2025 | Ativa | T2009-232 | Instalar o 2º banco de autotransformadores monofásicos 500/230/13,8 kV - 3x200 MVA *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | JARDIM | TR 500/230 kV JARDIM TR7 SE | RB | FT TR 500/230 kV JARDIM TR7 SE | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/6/2013 | 9/13/2048 | R$16,882.28 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BUCHA HSP 500 KV E 230 KV, TIPO OTF, DO AUTOTRAFO 05T7-C. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | TR 500/230 kV JARDIM TR7 SE | RB | FT TR 500/230 kV JARDIM TR7 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/12/2021 | 11/19/2056 | R$1,934.47 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | TR 500/230 kV JARDIM TR6 SE | RB | FT TR 500/230 kV JARDIM TR6 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,867,395.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | TR 500/230 kV JARDIM TR6 SE | RB | FT TR 500/230 kV JARDIM TR6 SE | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/29/2013 | 9/6/2048 | R$50,617.36 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BUCHAS HSP 500 KV e 230 KV, TIPO OTF, DOS AUTOTRAFOS 05T6 A/B/C. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | TR 500/230 kV JARDIM TR6 SE | RB | FT TR 500/230 kV JARDIM TR6 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 5,240,226.18 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | TR 500/230 kV JARDIM TR6 SE | RB | FT TR 500/230 kV JARDIM TR6 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 4,830,848.29 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | TR 230/69 kV JARDIM TR4 SE | RBF | FT TR 230/69 kV JARDIM TR4 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | TR 230/69 kV JARDIM TR4 SE | RBF | FT TR 230/69 kV JARDIM TR4 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/5/2020 | 12/13/2054 | R$16,175.75 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | TR 230/69 kV JARDIM TR3 SE | RBF | FT TR 230/69 kV JARDIM TR3 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | TR 230/69 kV JARDIM TR3 SE | RBF | FT TR 230/69 kV JARDIM TR3 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | TR 230/69 kV JARDIM TR3 SE | RBF | FT TR 230/69 kV JARDIM TR3 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$913,997.96 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | TR 230/69 kV JARDIM TR3 SE | RBF | FT TR 230/69 kV JARDIM TR3 SE | 061/2001 | IPCA | RMEL | REN 443/2011 | 6/18/2017 | 5/26/2052 | R$72,879.96 | 6/1/2025 | Ativa | Substituição de RADIADORES, SE JDM 04T3 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | TR 230/69 kV JARDIM TR3 SE | RBF | FT TR 230/69 kV JARDIM TR3 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/2/2021 | 3/10/2056 | R$91,430.77 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | TR 230/69 kV JARDIM TR2 SE | RBF | FT TR 230/69 kV JARDIM TR2 SE | 061/2001 | IPCA | RMEL | REA 9918/2021 | 4/22/2025 | 4/21/2060 | R$ 1,865,740.76 | 6/1/2025 | Ativa | T2020-014 | Obra de Substituição Completa - Substituição do transformador trifásico TR2 230/69 kV - 100 MVA da Subestação Jardim. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Nordeste | JARDIM | TR 230/69 kV JARDIM TR1 SE | RBF | FT TR 230/69 kV JARDIM TR1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | TR 230/69 kV JARDIM TR1 SE | RBF | FT TR 230/69 kV JARDIM TR1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | TR 230/69 kV JARDIM TR1 SE | RBF | FT TR 230/69 kV JARDIM TR1 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/20/2021 | 7/28/2056 | R$73,899.91 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | RTL 500 kV 40 Mvar JARDIM RTR1 SE | RB | FT RTL 500 kV 40 Mvar JARDIM RTR1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,710.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | RTL 500 kV 40 Mvar JARDIM RTR1 SE | RB | FT RTL 500 kV 40 Mvar JARDIM RTR1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$672,668.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | RTL 500 kV 40 Mvar JARDIM RTR1 SE | RB | FT RTL 500 kV 40 Mvar JARDIM RTR1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$620,117.76 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | RTL 500 kV 120 Mvar JARDIM RT1 SE | RB | FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$672,141.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | RTL 500 kV 120 Mvar JARDIM RT1 SE | RB | FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/6/2013 | 10/16/2049 | R$37,707.96 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BUCHAS HSP 500 KV TIPO OTF DOS REATORES 05E1 A/B/C E R. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | RTL 500 kV 120 Mvar JARDIM RT1 SE | RB | FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,886,143.22 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | RTL 500 kV 120 Mvar JARDIM RT1 SE | RB | FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,738,793.60 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | RTL 500 kV 120 Mvar JARDIM RT1 SE | RB | FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | 061/2001 | IPCA | RMEL | REN 443/2011 | 3/30/2014 | 4/1/2044 | R$15,042.24 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC 500KV, TIPO AKOF, DE FABRICAÇAO SIEMENS * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | RTL 500 kV 120 Mvar JARDIM RT1 SE | RB | FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | 061/2001 | IPCA | RMEL | REN 443/2011 | 3/30/2014 | 4/1/2044 | R$15,042.24 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC 500KV, TIPO AKOF, DE FABRICAÇAO SIEMENS * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | RTL 500 kV 120 Mvar JARDIM RT1 SE | RB | FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | 061/2001 | IPCA | RMEL | REN 443/2011 | 3/30/2014 | 4/1/2044 | R$15,042.24 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC 500KV, TIPO AKOF, DE FABRICAÇAO SIEMENS * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | MG 500 kV JARDIM MG1 SE | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,293,775.33 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | MG 500 kV JARDIM MG1 SE | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RBNI | REA 5225/2015 | 12/17/2017 | 6/10/2048 | R$193,901.90 | 6/1/2025 | Ativa | T2015-028 | Instalação do Módulo de Infraestrutura de Manobra, em 230 kV, na Subestação Jardim. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | JARDIM | MG 500 kV JARDIM MG1 SE | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RMEL | REN 643/2014 | 2/7/2014 | 2/6/2029 | R$157,080.52 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE AMPLIFICADORES ÓPTICOS EM FINAL DE VIDA ÚTIL Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | MG 500 kV JARDIM MG1 SE | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/3/2015 | 12/2/2032 | R$17,485.15 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição das Bateriais Saturnia 60PZS400 125 Vcc, Posições 800A1 e 800A2 .Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | MG 500 kV JARDIM MG1 SE | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/24/2015 | 7/23/2043 | R$28,078.35 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SWITCH.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | MG 500 kV JARDIM MG1 SE | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,630,552.18 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | MG 500 kV JARDIM MG1 SE | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 3,346,925.53 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | MG 500 kV JARDIM MG1 SE | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RMEL | REN 443/2011 | 3/17/2016 | 3/16/2044 | R$81,090.61 | 6/1/2025 | Ativa | Revitalização Necessária: Implantação de Switches Industriais * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | MG 500 kV JARDIM MG1 SE | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RMEL | REN 443/2011 | 12/29/2016 | 12/28/2044 | R$64,338.75 | 6/1/2025 | Ativa | Implantação de Sistemas Automáticos de Regulação associados a transformadores. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | MG 500 kV JARDIM MG1 SE | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/8/2022 | 1/20/2043 | R$ 1,115,066.04 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | MG 500 kV JARDIM MG1 SE | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RBNI | REN 905/2020 | 7/27/2022 | 7/26/2062 | R$183,926.00 | 6/1/2025 | Ativa | Extensão dos barramentos 05B1 e 05B2, da SE Jardim, composto por: estruturas, barramento, cabeação e demais itens de infraestrutura associada (cercas ou muros, terraplenagem, drenagem, embritamento, arruamento, iluminação de pátio, canaletas, malha de terra e para-raios) e instalação de um painel de interface identificação 5UA12-1, composto por: 01 Bastidor; 01 Unidade de Aquisição e Controle de dados (UAC); 02 Medidores de potência e qualidade de energia. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | MC 69 kV TT 69/13,8 kV JARDIM TA2 SE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | MC 69 kV TT 69/13,8 kV JARDIM TA1 SE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | MC 69 kV TT 69/13,8 kV JARDIM TA1 SE | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/7/2022 | 11/6/2037 | R$73,856.98 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JARDIM | MC 69 kV TR 69/13,8 kV JARDIM TR5 SE | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | MC 69 kV TR 230/69 kV JARDIM TR4 SE | RBF | FT TR 230/69 kV JARDIM TR4 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | MC 69 kV TR 230/69 kV JARDIM TR3 SE | RBF | FT TR 230/69 kV JARDIM TR3 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | MC 69 kV TR 230/69 kV JARDIM TR3 SE | RBF | FT TR 230/69 kV JARDIM TR3 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | MC 69 kV TR 230/69 kV JARDIM TR2 SE | RBF | FT TR 230/69 kV JARDIM TR2 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | MC 69 kV TR 230/69 kV JARDIM TR2 SE | RBF | FT TR 230/69 kV JARDIM TR2 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/25/2020 | 5/21/2052 | R$83,887.93 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | MC 69 kV TR 230/69 kV JARDIM TR1 SE | RBF | FT TR 230/69 kV JARDIM TR1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | MC 69 kV TR 230/69 kV JARDIM TR1 SE | RBF | FT TR 230/69 kV JARDIM TR1 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/23/2019 | 4/26/2050 | R$111,912.04 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | MC 69 kV BC 69 kV 21,3 Mvar JARDIM BC3 SE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | MC 69 kV BC 69 kV 21,3 Mvar JARDIM BC3 SE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | MC 69 kV BC 69 kV 21,3 Mvar JARDIM BC2 SE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | MC 69 kV BC 69 kV 21,3 Mvar JARDIM BC2 SE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | MC 69 kV BC 69 kV 21,3 Mvar JARDIM BC1 SE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | MC 69 kV BC 69 kV 21,3 Mvar JARDIM BC1 SE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | MC 500 kV TR 500/230 kV JARDIM TR8 SE | RB | FT TR 500/230 kV JARDIM TR8 SE | 061/2001 | IPCA | RBNI | REA 5225/2015 | 12/17/2017 | 7/8/2050 | R$ 1,726,305.32 | 6/1/2025 | Ativa | T2015-028 | Instalação do Módulo de Conexão de Transformador, em 500 kV, DJM, na Subestação Jardim. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | JARDIM | MC 500 kV TR 500/230 kV JARDIM TR8 SE | RB | FT TR 500/230 kV JARDIM TR8 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2022 | 12/30/2037 | R$7,049.70 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | MC 500 kV TR 500/230 kV JARDIM TR7 SE | RB | FT TR 500/230 kV JARDIM TR7 SE | 061/2001 | IPCA | RBNI | REA 2181/2009 | 12/17/2012 | 7/22/2045 | R$ 1,427,294.54 | 6/1/2025 | Ativa | T2009-232 | Instalar conexão de transformador 500 kV, arranjo disjuntor e meio, para o 2º banco de autotransformadores monofásicos 500/230/13,8 kV - 3x200 MVA *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | JARDIM | MC 500 kV TR 500/230 kV JARDIM TR7 SE | RB | FT TR 500/230 kV JARDIM TR7 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2022 | 12/30/2037 | R$7,998.02 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | MC 500 kV TR 500/230 kV JARDIM TR6 SE | RB | FT TR 500/230 kV JARDIM TR6 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$414,502.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | MC 500 kV TR 500/230 kV JARDIM TR6 SE | RB | FT TR 500/230 kV JARDIM TR6 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,163,163.61 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | MC 500 kV TR 500/230 kV JARDIM TR6 SE | RB | FT TR 500/230 kV JARDIM TR6 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,072,294.74 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | MC 500 kV TR 500/230 kV JARDIM TR6 SE | RB | FT TR 500/230 kV JARDIM TR6 SE | 061/2001 | IPCA | RMEL | REN 443/2011 | 11/20/2016 | 11/19/2040 | R$13,658.19 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE PARARAIOS, POSIÇÃO 75T6 FASE R DA SE JARDIM * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | MC 500 kV TR 500/230 kV JARDIM TR6 SE | RB | FT TR 500/230 kV JARDIM TR6 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/31/2019 | 12/31/2048 | R$97,523.86 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | MC 500 kV RTL 500 kV 120 Mvar JARDIM RT1 SE | RB | FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$251,123.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | MC 500 kV RTL 500 kV 120 Mvar JARDIM RT1 SE | RB | FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/14/2019 | 8/23/2045 | R$80,036.23 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | MC 230 kV TR 500/230 kV JARDIM TR8 SE | RB | FT TR 500/230 kV JARDIM TR8 SE | 061/2001 | IPCA | RBNI | REA 5225/2015 | 12/17/2017 | 4/20/2050 | R$ 1,098,100.75 | 6/1/2025 | Ativa | T2015-028 | Instalação do Módulo de Conexão de Transformador, em 230 kV, arranjo BD5, na Subestação Jardim. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | JARDIM | MC 230 kV TR 500/230 kV JARDIM TR7 SE | RB | FT TR 500/230 kV JARDIM TR7 SE | 061/2001 | IPCA | RBNI | REA 2181/2009 | 12/17/2012 | 4/20/2045 | R$962,435.28 | 6/1/2025 | Ativa | T2009-232 | Instalar conexão de transformador 230 kV, arranjo barra dupla a cinco chaves, para o 2º banco de autotransformadores monofásicos 500/230/13,8 kV - 3x200 MVA *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | JARDIM | MC 230 kV TR 500/230 kV JARDIM TR6 SE | RB | FT TR 500/230 kV JARDIM TR6 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | MC 230 kV TR 500/230 kV JARDIM TR6 SE | RB | FT TR 500/230 kV JARDIM TR6 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$454,511.36 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | MC 230 kV TR 500/230 kV JARDIM TR6 SE | RB | FT TR 500/230 kV JARDIM TR6 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$419,003.95 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | MC 230 kV TR 230/69 kV JARDIM TR4 SE | RBF | FT TR 230/69 kV JARDIM TR4 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | MC 230 kV TR 230/69 kV JARDIM TR3 SE | RBF | FT TR 230/69 kV JARDIM TR3 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | MC 230 kV TR 230/69 kV JARDIM TR3 SE | RBF | FT TR 230/69 kV JARDIM TR3 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$454,511.36 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | MC 230 kV TR 230/69 kV JARDIM TR3 SE | RBF | FT TR 230/69 kV JARDIM TR3 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/3/2021 | 9/6/2051 | R$65,336.24 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | MC 230 kV TR 230/69 kV JARDIM TR2 SE | RBF | FT TR 230/69 kV JARDIM TR2 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | MC 230 kV TR 230/69 kV JARDIM TR2 SE | RBF | FT TR 230/69 kV JARDIM TR2 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/16/2021 | 12/26/2051 | R$223,754.34 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | MC 230 kV TR 230/69 kV JARDIM TR1 SE | RBF | FT TR 230/69 kV JARDIM TR1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | MC 230 kV TR 230/69 kV JARDIM TR1 SE | RBF | FT TR 230/69 kV JARDIM TR1 SE | 061/2001 | IPCA | RMEL | REN 643/2014 | 3/9/2014 | 3/17/2045 | R$51,980.88 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS TC NISSIN FASES 94T1 A/B/C Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | MC 230 kV TR 230/69 kV JARDIM TR1 SE | RBF | FT TR 230/69 kV JARDIM TR1 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/9/2022 | 5/24/2053 | R$164,024.31 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | IB 69 kV MG 500 kV JARDIM MG1 SE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | IB 69 kV MG 500 kV JARDIM MG1 SE IB1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/7/2022 | 4/7/2038 | R$41,002.33 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JARDIM | IB 500 kV MG 500 kV JARDIM MG1 SE IB2 | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$439,875.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | IB 500 kV MG 500 kV JARDIM MG1 SE IB2 | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RMEL | REN 643/2014 | 2/23/2014 | 4/13/2045 | R$60,778.76 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC TIPO AKOF 500 DE FABRICAÇAO SIEMENS, 95D2-1 FASES A/B/C Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | IB 500 kV MG 500 kV JARDIM MG1 SE IB2 | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RMEL | REN 643/2014 | 4/13/2014 | 6/1/2045 | R$40,703.63 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC TIPO AKOF 500 DE FABRICAÇAO SIEMENS, 95D2-2 FASES A/C Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | IB 500 kV MG 500 kV JARDIM MG1 SE IB2 | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,234,365.24 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | IB 500 kV MG 500 kV JARDIM MG1 SE IB2 | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,137,933.94 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | IB 500 kV MG 500 kV JARDIM MG1 SE IB2 | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/15/2021 | 10/18/2051 | R$185,153.81 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | IB 500 kV MG 500 kV JARDIM MG1 SE IB1 | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$439,875.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | IB 500 kV MG 500 kV JARDIM MG1 SE IB1 | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RMEL | REN 643/2014 | 3/23/2014 | 5/11/2045 | R$60,936.86 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC TIPO AKOF 500 DE FABRICAÇAO SIEMENS, 95D1-1 FASES A/B/C Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | IB 500 kV MG 500 kV JARDIM MG1 SE IB1 | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RMEL | REN 643/2014 | 4/27/2014 | 6/15/2045 | R$61,134.50 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC TIPO AKOF 500 DE FABRICAÇAO SIEMENS, 95D1-2 FASES A/B/C Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | IB 500 kV MG 500 kV JARDIM MG1 SE IB1 | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,234,365.24 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | IB 500 kV MG 500 kV JARDIM MG1 SE IB1 | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,137,933.94 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | IB 500 kV MG 500 kV JARDIM MG1 SE IB1 | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/2/2021 | 8/5/2051 | R$150,906.35 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | IB 230 kV MG 500 kV JARDIM MG1 SE IB1 | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,085.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | IB 230 kV MG 500 kV JARDIM MG1 SE IB1 | RB | FT MG 500 kV JARDIM MG1 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/24/2022 | 4/23/2055 | R$131,840.16 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM UPGN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM UPGN | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/3/2022 | 6/16/2038 | R$89,444.78 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM TAICOCA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM TAICOCA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM S.CRISTOVAO | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM RIACHUELO C-2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM RIACHUELO C-2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/28/2019 | 12/14/2047 | R$28,765.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM RIACHUELO C-1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM RIACHUELO C-1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/18/2022 | 9/1/2038 | R$89,777.47 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM RIACHUELO C-1 | DIT | 061/2001 | IPCA | RCDM | DSP 681/2022 | 12/5/2022 | 12/4/2055 | R$72,722.51 | 6/1/2025 | Ativa | Substituição de 1 (um) Disjuntor 69 kV associado ao vão LT Grageru C2 (DJ12C4), base e estrutura de suporte, posição operacional 12C4 da SE JARDIM, por outro com capacidade nominal de curto-circuito mínima de 31,5 kA. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM M.URUBU | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM GRAGERO C-2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM GRAGERO C-2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/25/2022 | 9/8/2038 | R$89,848.31 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM GRAGERO C-2 | DIT | 061/2001 | IPCA | RCDM | DSP 681/2022 | 12/11/2022 | 12/10/2055 | R$72,752.29 | 6/1/2025 | Ativa | Substituição de 1 (um) Disjuntor 69 kV associado ao vão LT São Cristóvão C2 (DJ12C7), base e estrutura de suporte, posição operacional 12C7 da SE JARDIM, por outro com capacidade nominal de curto-circuito mínima de 31,5 kA. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM GRAGERO C-1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM ESTANCIA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM ATALAIA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM ATALAIA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM ATALAIA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM ATALAIA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/12/2021 | 12/15/2051 | R$11,375.55 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM ARACAJU C-2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM ARACAJU C-2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/21/2022 | 3/19/2038 | R$89,110.62 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM ARACAJU C-2 | DIT | 061/2001 | IPCA | RCDM | DSP 681/2022 | 12/17/2022 | 12/16/2055 | R$72,782.09 | 6/1/2025 | Ativa | Substituição de 1 (um) Disjuntor 69 kV associado ao vão LT Itaporanga (DJ12C8), base e estrutura de suporte, posição operacional 12C8 da SE JARDIM, por outro com capacidade nominal de curto-circuito mínima de 31,5 kA. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM ARACAJU C-1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM ARACAJU C-1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/14/2022 | 4/10/2038 | R$84,740.23 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM 02X3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM 02X3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM 02X3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM 02X2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | EL 69 kV JARDIM 02X2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/18/2021 | 4/17/2040 | R$117,709.35 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JARDIM | EL 500 kV JARDIM LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | RB | FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$469,641.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | EL 500 kV JARDIM LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | RB | FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/3/2013 | 11/6/2043 | R$29,657.97 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC TIPO AKOF 500 DE FABRICAÇAO SIEMENS, 95V5 FASES A/B. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | EL 500 kV JARDIM LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | RB | FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,317,894.34 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | EL 500 kV JARDIM LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | RB | FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,214,937.56 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | EL 500 kV JARDIM LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | RB | FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | 061/2001 | IPCA | RBNI | REA 5861/2016 | 6/8/2016 | 6/7/2044 | R$21,332.35 | 6/1/2025 | Ativa | EL 500 kV JARDIM LT 500 kV USINA XINGO /JARDIM C-1 AL/SE * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | EL 500 kV JARDIM LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | RB | FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/25/2021 | 3/22/2047 | R$380,434.39 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | EL 500 kV JARDIM LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA | RB | FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$469,641.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | EL 500 kV JARDIM LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA | RB | FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 3/3/2013 | 3/6/2043 | R$14,473.97 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC TIPO AKOF 500 DE FABRICAÇAO SIEMENS, 95V7 FASE B. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | EL 500 kV JARDIM LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA | RB | FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 4/13/2013 | 4/16/2043 | R$14,533.38 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC TIPO AKOF 500 DE FABRICAÇAO SIEMENS, 95V7 FASE C.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | EL 500 kV JARDIM LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA | RB | FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,317,894.34 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | EL 500 kV JARDIM LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA | RB | FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,214,937.56 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | EL 500 kV JARDIM LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA | RB | FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/11/2020 | 7/14/2050 | R$132,824.70 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | EL 230 kV JARDIM LT 230 kV N.S.SOCORRO /JARDIM C-2 SE | RB | FT LT 230 kV N.S.SOCORRO /JARDIM C-2 SE | 005/2008 | IPCA | RBL | CC 005/2008 | 3/17/2008 | 3/17/2038 | R$479,946.71 | 6/1/2025 | Ativa | T2000-188 | Contrato de Concessão nº 005/2008 *(Considera adicional de RGR relativo à prorrogação do encargo) * (Receita revisada em 18/06/2013)* Receita revisada no reajuste da RAP do ciclo 2018-2019. * Receita revisada em 07-11-2023 | ||
| AXIA Energia Nordeste | JARDIM | EL 230 kV JARDIM LT 230 kV N.S.SOCORRO /JARDIM C-1 SE | RB | FT LT 230 kV N.S.SOCORRO /JARDIM C-1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | EL 230 kV JARDIM LT 230 kV N.S.SOCORRO /JARDIM C-1 SE | RB | FT LT 230 kV N.S.SOCORRO /JARDIM C-1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | EL 230 kV JARDIM LT 230 kV N.S.SOCORRO /JARDIM C-1 SE | RB | FT LT 230 kV N.S.SOCORRO /JARDIM C-1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$584,375.21 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | EL 230 kV JARDIM LT 230 kV N.S.SOCORRO /JARDIM C-1 SE | RB | FT LT 230 kV N.S.SOCORRO /JARDIM C-1 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/15/2020 | 4/13/2049 | R$97,943.10 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | EL 230 kV JARDIM LT 230 kV ITABAIANA /JARDIM C-2 SE | RB | FT LT 230 kV ITABAIANA /JARDIM C-2 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | EL 230 kV JARDIM LT 230 kV ITABAIANA /JARDIM C-2 SE | RB | FT LT 230 kV ITABAIANA /JARDIM C-2 SE | 061/2001 | IPCA | RMEL | REN 643/2014 | 2/2/2014 | 2/10/2045 | R$51,811.41 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS TC NISSIN 94C2 FASES A/B/C Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | EL 230 kV JARDIM LT 230 kV ITABAIANA /JARDIM C-2 SE | RB | FT LT 230 kV ITABAIANA /JARDIM C-2 SE | 061/2001 | IPCA | RBNI | REA 5861/2016 | 6/10/2016 | 6/9/2031 | R$9,475.62 | 6/1/2025 | Ativa | REVITALIZAÇÃO NECESSÁRIA: SUBSTITUIÇÃO DE SISTEMAS DE PROTEÇÃO E PAINÉIS ASSOCIADOS EM 03 TERMINAIS DE LINHAS DE TRANSMISSÃO (LTs-04C2). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | EL 230 kV JARDIM LT 230 kV ITABAIANA /JARDIM C-2 SE | RB | FT LT 230 kV ITABAIANA /JARDIM C-2 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/6/2022 | 8/24/2042 | R$157,154.98 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | EL 230 kV JARDIM LT 230 kV ITABAIANA /JARDIM C-1 SE | RB | FT LT 230 kV ITABAIANA /JARDIM C-1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JARDIM | EL 230 kV JARDIM LT 230 kV ITABAIANA /JARDIM C-1 SE | RB | FT LT 230 kV ITABAIANA /JARDIM C-1 SE | 061/2001 | IPCA | RMEL | REN 643/2014 | 1/19/2014 | 1/27/2045 | R$51,743.63 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS TC NISSIN 94C1 FASES A/B/C Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | EL 230 kV JARDIM LT 230 kV ITABAIANA /JARDIM C-1 SE | RB | FT LT 230 kV ITABAIANA /JARDIM C-1 SE | 061/2001 | IPCA | RBNI | REA 5861/2016 | 6/10/2016 | 6/9/2031 | R$4,737.81 | 6/1/2025 | Ativa | REVITALIZAÇÃO NECESSÁRIA: SUBSTITUIÇÃO DE SISTEMAS DE PROTEÇÃO E PAINÉIS ASSOCIADOS EM 03 TERMINAIS DE LINHAS DE TRANSMISSÃO (LTs-04C1 ). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | EL 230 kV JARDIM LT 230 kV ITABAIANA /JARDIM C-1 SE | RB | FT LT 230 kV ITABAIANA /JARDIM C-1 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/3/2022 | 9/11/2042 | R$163,231.15 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JARDIM | EL 230 kV JARDIM CIMESA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | EL 230 kV JARDIM CIMESA | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 9/8/2013 | 9/11/2043 | R$13,102.36 | 6/1/2025 | Ativa | Substituir TC com histórico de falha. Posição Operacional: 94F2-A/JDM * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | JARDIM | EL 230 kV JARDIM CIMESA | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 9/8/2013 | 9/11/2043 | R$13,102.36 | 6/1/2025 | Ativa | Substituir TC com histórico de falha. Posição Operacional: 94F2-B/JDM * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | JARDIM | EL 230 kV JARDIM CIMESA | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 9/8/2013 | 9/11/2043 | R$13,102.36 | 6/1/2025 | Ativa | Substituir TC com histórico de falha. Posição Operacional: 94F2-C/JDM * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | JARDIM | EL 230 kV JARDIM CIMESA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/21/2022 | 11/9/2050 | R$78,717.64 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JARDIM | EL 230 kV JARDIM CIMESA | DIT | 061/2001 | IPCA | RCDM | REA 5861/2016 | 2/1/2015 | 1/31/2030 | R$8,641.97 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE SISTEMAS DE PROTEÇÃO E PAINÉIS ASSOCIADOS AO TERMINAL DE LINHA DE TRANSMISSÃO (LT-04C1). Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JARDIM | BC 69 kV 21,3 Mvar JARDIM BC3 SE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$107,937.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | BC 69 kV 21,3 Mvar JARDIM BC3 SE | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/1/2013 | 10/31/2033 | R$80,167.89 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS CAPACITORES DE ASCAREL FABRICADO POR INDUCON MODELO FPA2 69KV 02H3.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | JARDIM | BC 69 kV 21,3 Mvar JARDIM BC2 SE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$107,937.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | BC 69 kV 21,3 Mvar JARDIM BC2 SE | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/6/2013 | 11/5/2033 | R$80,229.32 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS CAPACITORES DE ASCAREL FABRICADO POR INDUCON MODELO FPA2 69KV 02H2.Incluído no reajuste ciclo 2015-2016. Alterado após Recurso em face da REH 1.918/2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | JARDIM | BC 69 kV 21,3 Mvar JARDIM BC1 SE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$107,937.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JARDIM | BC 69 kV 21,3 Mvar JARDIM BC1 SE | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/25/2013 | 10/24/2033 | R$80,081.91 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS CAPACITORES DE ASCAREL FABRICADO POR INDUCON MODELO FPA2 69KV 02H1. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Norte | JARU | TR 230/69 kV JARU TR3 RO | RBF | FT TR 230/69 kV JARU TR3 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$201,428.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JARU | TR 230/69 kV JARU TR3 RO | RBF | FT TR 230/69 kV JARU TR3 RO | 058/2001 | IPCA | RBNI | REA 4225/2013 | 12/1/2016 | 7/4/2051 | R$995,325.05 | 6/1/2025 | Ativa | T2013-034 | Instalação, na SE Jaru, do terceiro TR 230/69 kV TR3 de 30 MVA novo. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JARU | TR 230/69 kV JARU TR2 RO | RBF | FT TR 230/69 kV JARU TR2 RO | 058/2001 | IPCA | RBNI | REA 3216/2011 | 9/14/2015 | 9/13/2040 | R$99,617.88 | 6/1/2025 | Ativa | T2011-125 | Instalar, na SE Jaru, 1 autotransformador trifásico 230/69 kV - 30MVA, existente na SE. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JARU | TR 230/69 kV JARU TR2 RO | RBF | FT TR 230/69 kV JARU TR2 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$201,428.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JARU | TR 230/69 kV JARU TR1 RO | RBF | FT TR 230/69 kV JARU TR1 RO | 058/2001 | IPCA | RBNI | REA 3216/2011 | 6/11/2018 | 6/10/2043 | R$104,863.25 | 6/1/2025 | Ativa | T2011-125 | Remanejar, na SE Jaru, o transformador trifásico TR - 1 230/69 kV de 30MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JARU | TR 230/69 kV JARU TR1 RO | RBF | FT TR 230/69 kV JARU TR1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$201,428.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JARU | TR 230/69 kV JARU TR1 RO | RBF | FT TR 230/69 kV JARU TR1 RO | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 12/19/2016 | 12/18/2031 | R$18,992.04 | 6/1/2025 | Ativa | Implantacao de sistema de medicao e monitoramento online de Buchas Condensivas do equipamento JRTF601 para integrar ao SISTEMA DE SUPERVISAO SAGE Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | JARU | MG 230 kV JARU MG1 RO | RB | FT MG 230 kV JARU MG1 RO | 058/2001 | IPCA | RBNI | REA 3216/2011 | 9/14/2015 | 12/23/2041 | R$ 1,009,705.95 | 6/1/2025 | Ativa | T2011-125 | Complementar o módulo de infraestrutura geral da SE Jaru com a adequação do barramento 230kV para barra dupla a 4 chaves, instalação de 4 módulos de infraestrutura de manobra 230 kV e instalação de módulo de infraestrutura de manobra 69 kV. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JARU | MG 230 kV JARU MG1 RO | RB | FT MG 230 kV JARU MG1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,784.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JARU | MG 230 kV JARU MG1 RO | RB | FT MG 230 kV JARU MG1 RO | 058/2001 | IPCA | RBNI | REA 4225/2013 | 12/1/2016 | 7/22/2046 | R$186,276.04 | 6/1/2025 | Ativa | T2013-034 | Instalação de um módulo de infraestrutura de manobra para o módulo de conexão em 230 kV do terceiro transformador trifásico 230/69 kV - 30 MVA da subestação Jaru. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JARU | MG 230 kV JARU MG1 RO | RB | FT MG 230 kV JARU MG1 RO | 058/2001 | IPCA | RBNI | REA 4225/2013 | 12/1/2016 | 7/22/2046 | R$53,903.38 | 6/1/2025 | Ativa | T2013-034 | Módulo de infraestrutura de manobra para o módulo de conexão em 69 kV do terceiro transformador trifásico 230/69 kV - 30 MVA da subestação Jaru. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JARU | MG 230 kV JARU MG1 RO | RB | FT MG 230 kV JARU MG1 RO | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 1/24/2014 | 1/23/2029 | R$149,770.54 | 6/1/2025 | Ativa | TORRE DE TELECOMUNICAÇÕES Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | JARU | MC 69 kV TR 230/69 kV JARU TR3 RO | RBF | FT TR 230/69 kV JARU TR3 RO | 058/2001 | IPCA | RBNI | REA 4225/2013 | 12/1/2016 | 9/14/2047 | R$389,144.86 | 6/1/2025 | Ativa | T2013-034 | Instalação, na SE Jaru, de um módulo de conexão 69 kV, arranjo barra principal e transferência, para o Transformador TR3 230/69 kV - 30 MVA. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JARU | MC 69 kV TR 230/69 kV JARU TR2 RO | RBF | FT TR 230/69 kV JARU TR2 RO | 058/2001 | IPCA | RBNI | REA 3216/2011 | 9/14/2015 | 11/4/2045 | R$337,395.86 | 6/1/2025 | Ativa | T2011-125 | Instalar, na SE Jaru, 1 módulo de conexão 69 kV para o autotransformador trifásico TR - 2 230/69 kV - 30 MVA, arranjo barra dupla a 4 chaves. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JARU | MC 69 kV TR 230/69 kV JARU TR1 RO | RBF | FT TR 230/69 kV JARU TR1 RO | 058/2001 | IPCA | RBNI | REA 3216/2011 | 6/11/2018 | 11/15/2051 | R$64,456.19 | 6/1/2025 | Ativa | T2011-125 | Adequar, na SE Jaru, 1 módulo de conexão 69 kV para o transformador trifásico TR - 1 230/69 kV - 30 MVA, arranjo barra principal e transferência. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JARU | MC 69 kV TR 230/69 kV JARU TR1 RO | RBF | FT TR 230/69 kV JARU TR1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$66,931.92 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JARU | MC 69 kV TR 230/69 kV JARU TR1 RO | RBF | FT TR 230/69 kV JARU TR1 RO | 058/2001 | IPCA | RMEL | REN 905/2020 | 6/23/2021 | 6/22/2045 | R$5,030.83 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | JARU | MC 230 kV TR 230/69 kV JARU TR3 RO | RBF | FT TR 230/69 kV JARU TR3 RO | 058/2001 | IPCA | RBNI | REA 4225/2013 | 12/1/2016 | 8/5/2047 | R$ 1,017,220.10 | 6/1/2025 | Ativa | T2013-034 | Implantação, na SE Jaru, de um módulo de conexão 230 kV, arranjo barra dupla com quatro chaves, para o Transformador TR3 230/69 kV - 30 MVA. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JARU | MC 230 kV TR 230/69 kV JARU TR2 RO | RBF | FT TR 230/69 kV JARU TR2 RO | 058/2001 | IPCA | RBNI | REA 3216/2011 | 9/14/2015 | 8/7/2046 | R$984,286.14 | 6/1/2025 | Ativa | T2011-125 | Instalar, na SE Jaru, 1 módulo de conexão 230 kV para o autotransformador trifásico TR - 2 230/69 kV - 30 MVA, arranjo barra dupla a 4 chaves. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JARU | MC 230 kV TR 230/69 kV JARU TR1 RO | RBF | FT TR 230/69 kV JARU TR1 RO | 058/2001 | IPCA | RBNI | REA 3216/2011 | 6/11/2018 | 10/16/2050 | R$163,902.38 | 6/1/2025 | Ativa | T2011-125 | Adequar, na SE Jaru, 1 módulo de conexão 230 kV para o autotransformador trifásico TR - 1 230/69 kV - 30 MVA, arranjo barra dupla a 4 chaves. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JARU | MC 230 kV TR 230/69 kV JARU TR1 RO | RBF | FT TR 230/69 kV JARU TR1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$164,434.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JARU | IB 230 kV MG 230 kV JARU MG1 RO IB1 | RB | FT MG 230 kV JARU MG1 RO | 058/2001 | IPCA | RBNI | REA 3216/2011 | 9/14/2015 | 11/8/2046 | R$772,054.25 | 6/1/2025 | Ativa | T2011-125 | Instalar, na SE Jaru, 1 módulo de interligação de barras 230 kV, arranjo barra dupla a 4 chaves. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JARU | EL 230 kV JARU LT 230 kV JARU /JI-PARANA C-1 RO | RB | FT LT 230 kV JARU /JI-PARANA C-1 RO | 058/2001 | IPCA | RBNI | REA 3216/2011 | 9/14/2015 | 12/29/2045 | R$ 1,096,280.83 | 6/1/2025 | Ativa | T2011-125 | Instalar, na SE JARU, um módulo de entrada de linha para o circuito LT 230 kV JARU /JI-PARANA C-1 RO originado do seccionamento do circuito LT 230 kV ARIQUEMES /JI-PARANA C-1 RO na SE JARU. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JARU | EL 230 kV JARU LT 230 kV ARIQUEMES /JARU C-1 RO | RB | FT LT 230 kV ARIQUEMES /JARU C-1 RO | 058/2001 | IPCA | RBNI | REA 3216/2011 | 9/14/2015 | 9/13/2045 | R$ 1,096,112.93 | 6/1/2025 | Ativa | T2011-125 | Instalar, na SE JARU, um módulo de entrada de linha para o circuito LT 230 kV ARIQUEMES /JARU C-1 RO originado do seccionamento do circuito LT 230 kV ARIQUEMES /JI-PARANA C-1 RO na SE JARU. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JAURU | TR 230/138 kV JAURU TRR1 MT | RBF | FT TR 230/138 kV JAURU TRR1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$309,729.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JAURU | TR 230/138 kV JAURU TRR1 MT | RBF | FT TR 230/138 kV JAURU TRR1 MT | 058/2001 | IPCA | RMEL | REN 905/2020 | 12/17/2020 | 12/16/2060 | R$6,308.76 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | JAURU | TR 230/138 kV JAURU TR2 MT | RBF | FT TR 230/138 kV JAURU TR2 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$929,188.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JAURU | TR 230/138 kV JAURU TR2 MT | RBF | FT TR 230/138 kV JAURU TR2 MT | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 11/18/2020 | 11/17/2035 | R$31,516.02 | 6/1/2025 | Ativa | Instalacao de Sistema de Medicao e Monitoramento Online de buchas condensivas do equipamento JUAT602 para integrar o sistema de supervisao SAGE Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | JAURU | TR 230/138 kV JAURU TR1 MT | RBF | FT TR 230/138 kV JAURU TR1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$929,188.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JAURU | RTN 69 kV 0 Mvar JAURU RN4 MT | RB | FT LT 230 kV JAURU /VARZEA GRANDE 2 C-1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$16,446.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JAURU | RTN 69 kV 0 Mvar JAURU RN3 MT | RB | FT LT 230 kV JAURU /VARZEA GRANDE 2 C-2 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$16,446.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JAURU | RTL 230 kV 30 Mvar JAURU RT7 MT | RB | FT LT 230 kV VILHENA /JAURU C-3 RO/MT | 021/2009 | IPCA | RBL | CC 021/2009 | 10/28/2015 | 11/19/2039 | R$799,412.81 | 6/1/2025 | Ativa | T2009-245 | *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Norte | JAURU | RTL 230 kV 30 Mvar JAURU RT4 MT | RB | FT LT 230 kV JAURU /VARZEA GRANDE 2 C-1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$274,857.33 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JAURU | RTL 230 kV 30 Mvar JAURU RT3 MT | RB | FT LT 230 kV JAURU /VARZEA GRANDE 2 C-2 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$274,857.33 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JAURU | RTL 230 kV 30 Mvar JAURU RT3 MT | RB | FT LT 230 kV JAURU /VARZEA GRANDE 2 C-2 MT | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 11/19/2020 | 11/18/2035 | R$19,318.94 | 6/1/2025 | Ativa | Implantacao de Sistema de Medicao e Monitoramento OnLine de Buchas Condensivas do Equipamento JURE603 Para Integrar ao SISTEMA DE SUPERVISAO SAGE Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | JAURU | RTB 230 kV 33,33 Mvar JAURU RTR MT | RB | FT RTB 230 kV 33,33 Mvar JAURU RTR MT | 058/2001 | IPCA | RBNI | REA 8348/2019 | 12/30/2021 | 7/27/2057 | R$368,356.62 | 6/1/2025 | Ativa | T2019-027 | Instalação de Reator de Barra Monofásico Reserva - 230 kV na SE Jauru *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JAURU | RTB 230 kV 100 Mvar JAURU RT1 MT | RB | FT RTB 230 kV 100 Mvar JAURU RT1 MT | 058/2001 | IPCA | RBNI | REA 8348/2019 | 1/14/2022 | 8/11/2057 | R$ 1,106,010.35 | 6/1/2025 | Ativa | T2019-027 | Instalação de Banco de Reatores Monofásico de Barra - 230 kV (3x33,33 MVAr) na SE Jauru - RT1 *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JAURU | MG 230 kV JAURU MG1 MT | RB | FT MG 230 kV JAURU MG1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$593,252.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JAURU | MG 230 kV JAURU MG1 MT | RB | FT MG 230 kV JAURU MG1 MT | 058/2001 | IPCA | RBNI | REA 8348/2019 | 12/30/2021 | 10/1/2044 | R$423,765.56 | 6/1/2025 | Ativa | T2019-027 | Modulo de Infra estrutura de manobra 230 kV- BD4 para instalação de Reator Monofasico de Barra 230 kV e Reserva *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JAURU | MG 230 kV JAURU MG1 MT | RB | FT MG 230 kV JAURU MG1 MT | 058/2001 | IPCA | RMEL | REN 905/2020 | 1/12/2015 | 1/11/2032 | R$44,852.75 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | JAURU | MC 230 kV TR 230/138 kV JAURU TRR1 MT | RBF | FT TR 230/138 kV JAURU TRR1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$183,181.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JAURU | MC 230 kV TR 230/138 kV JAURU TR2 MT | RBF | FT TR 230/138 kV JAURU TR2 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$183,181.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JAURU | MC 230 kV TR 230/138 kV JAURU TR1 MT | RBF | FT TR 230/138 kV JAURU TR1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$183,181.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JAURU | MC 230 kV RTL 230 kV 30 Mvar JAURU RT7 MT | RB | FT LT 230 kV VILHENA /JAURU C-3 RO/MT | 021/2009 | IPCA | RBL | CC 021/2009 | 10/28/2015 | 11/19/2039 | R$243,731.69 | 6/1/2025 | Ativa | T2009-245 | *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Norte | JAURU | MC 230 kV RTL 230 kV 30 Mvar JAURU RT4 MT | RB | FT LT 230 kV JAURU /VARZEA GRANDE 2 C-1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$109,485.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JAURU | MC 230 kV RTL 230 kV 30 Mvar JAURU RT3 MT | RB | FT LT 230 kV JAURU /VARZEA GRANDE 2 C-2 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$109,485.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JAURU | MC 230 kV RTB 230 kV 100 Mvar JAURU RT1 MT | RB | FT RTB 230 kV 100 Mvar JAURU RT1 MT | 058/2001 | IPCA | RBNI | REA 8348/2019 | 1/14/2022 | 1/13/2053 | R$ 1,605,770.22 | 6/1/2025 | Ativa | T2019-027 | SE Jauru - SE Jauru - Instalação de Módulo de Conexão de Reator de Barra Monofásico 230 kV 3x33,3 MVAr *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JAURU | MC 138 kV TR 230/138 kV JAURU TR2 MT | RBF | FT TR 230/138 kV JAURU TR2 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$122,666.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JAURU | MC 138 kV TR 230/138 kV JAURU TR1 MT | RBF | FT TR 230/138 kV JAURU TR1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$122,666.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JAURU | IB 230 kV MG 230 kV JAURU MG1 MT IB1 | RB | FT MG 230 kV JAURU MG1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$158,618.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JAURU | EL 230 kV JAURU LT 230 kV VILHENA /JAURU C-3 RO/MT | RB | FT LT 230 kV VILHENA /JAURU C-3 RO/MT | 021/2009 | IPCA | RBL | CC 021/2009 | 10/28/2015 | 11/19/2039 | R$743,362.45 | 6/1/2025 | Ativa | T2009-245 | *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Norte | JAURU | EL 230 kV JAURU LT 230 kV JAURU /VARZEA GRANDE 2 C-2 MT | RB | FT LT 230 kV JAURU /VARZEA GRANDE 2 C-2 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$260,258.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JAURU | EL 230 kV JAURU LT 230 kV JAURU /VARZEA GRANDE 2 C-2 MT | RB | FT LT 230 kV JAURU /VARZEA GRANDE 2 C-2 MT | 058/2001 | IPCA | RBNI | REA 5861/2016 | 6/7/2019 | 6/6/2047 | R$75,549.97 | 6/1/2025 | Ativa | Implantação de Unidade de Medição Fasorial – PMU nos bays das LT 230 kV Jauru / Coxipo C-1 - Seccionada na SE Várzea Grande * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | JAURU | EL 230 kV JAURU LT 230 kV JAURU /VARZEA GRANDE 2 C-1 MT | RB | FT LT 230 kV JAURU /VARZEA GRANDE 2 C-1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$260,258.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JAURU | EL 230 kV JAURU LT 230 kV JAURU /VARZEA GRANDE 2 C-1 MT | RB | FT LT 230 kV JAURU /VARZEA GRANDE 2 C-1 MT | 058/2001 | IPCA | RBNI | REA 5861/2016 | 6/7/2019 | 6/6/2047 | R$1,003.06 | 6/1/2025 | Ativa | Implantação de Unidade de Medição Fasorial – PMU nos bays das LT 230 kV Jauru / Varzea Grande C-1. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | JAURU | EL 230 kV JAURU LT 230 kV JAURU /VARZEA GRANDE 2 C-1 MT | RB | FT LT 230 kV JAURU /VARZEA GRANDE 2 C-1 MT | 058/2001 | IPCA | RMEL | REN 905/2020 | 3/15/2022 | 3/17/2052 | R$24,309.45 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | JAURU | EL 230 kV JAURU LT 230 kV JAURU /VARZEA GRANDE 2 C-1 MT | RB | FT LT 230 kV JAURU /VARZEA GRANDE 2 C-1 MT | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 12/29/2020 | 12/28/2048 | R$1,633.17 | 6/1/2025 | Ativa | MODERNIZAÇÃO - RELOGIO SINCRONIZADO POR SATELITE GPS, RT420NTP PADRAO, 16 ENTRADAS Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JEREMOABO | MG 500 kV JEREMOABO MG1 BA | RB | FT MG 500 kV JEREMOABO MG1 BA | 061/2001 | IPCA | RBNI | DSP 568/2024 | 3/18/2023 | 3/17/2041 | R$72,644.46 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura Geral de Acessante -MIG-A 500 kV na SE Jeremoabo, em função do seccionamento da LT 500 kV Paulo Afonso IV - Olindina C1. | |||
| AXIA Energia Nordeste | JEREMOABO | MG 500 kV JEREMOABO MG1 BA | RB | FT MG 500 kV JEREMOABO MG1 BA | 061/2001 | IPCA | RBNI | DSP 568/2024 | 3/18/2023 | 3/17/2054 | R$83,527.95 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 500 kV na SE Jeremoabo, em função do seccionamento da LT 500 kV Paulo Afonso IV - Olindina C1. | |||
| AXIA Energia Nordeste | JEREMOABO | IB 500 kV MG 500 kV JEREMOABO MG1 BA IB1 | RB | FT MG 500 kV JEREMOABO MG1 BA | 061/2001 | IPCA | RBNI | DSP 568/2024 | 3/18/2023 | 3/17/2055 | R$278,932.06 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Interligação de Barras 500 kV na SE Jeremoabo, em função do seccionamento da LT 500 kV Paulo Afonso IV - Olindina C1. | |||
| AXIA Energia Nordeste | JEREMOABO | EL 500 kV JEREMOABO LT 500 kV P. AFONSO IV /JEREMOABO C-1 BA | RB | FT LT 500 kV P. AFONSO IV /JEREMOABO C-1 BA | 061/2001 | IPCA | RBNI | DSP 568/2024 | 3/18/2023 | 3/17/2051 | R$261,137.24 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV, arranjo Disjuntor e Meio, na subestação Jeremoabo, associada à Linha de Transmissão 500 kV Paulo Afonso IV – Jeremoabo C1. | |||
| AXIA Energia Nordeste | JEREMOABO | EL 500 kV JEREMOABO LT 500 kV JEREMOABO /OLINDINA C-1 BA | RB | FT LT 500 kV JEREMOABO /OLINDINA C-1 BA | 061/2001 | IPCA | RBNI | DSP 568/2024 | 3/18/2023 | 3/17/2051 | R$261,137.24 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV, arranjo Disjuntor e Meio, na subestação Jeremoabo, associada à Linha de Transmissão 500 kV Jeremoabo – Olindina C1. | |||
| AXIA Energia Norte | JI-PARANA | TR 230/69 kV JI-PARANA TR3 RO | RBF | FT TR 230/69 kV JI-PARANA TR3 RO | 058/2001 | IPCA | RBNI | REA 2533/2010 | 8/25/2014 | 8/24/2040 | R$ 1,228,393.13 | 6/1/2025 | Ativa | T2009-106 | SE Ji-Paraná - Instalação do 3º transformador 230/69 kV de 60 MVA, equipamento já exitente na subestação como reserva fria. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JI-PARANA | TR 230/69 kV JI-PARANA TR3 RO | RBF | FT TR 230/69 kV JI-PARANA TR3 RO | 058/2001 | IPCA | RBNI | REA 2533/2010 | 8/25/2014 | 8/24/2038 | R$1,349.26 | 6/1/2025 | Ativa | T2009-106 | Instalar, na SE Ji-Paraná, pararraios no terciário do transformador trifásico TR3 230/69-13,8 kV, 60 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JI-PARANA | TR 230/69 kV JI-PARANA TR2 RO | RBF | FT TR 230/69 kV JI-PARANA TR2 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$327,895.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JI-PARANA | TR 230/69 kV JI-PARANA TR2 RO | RBF | FT TR 230/69 kV JI-PARANA TR2 RO | 058/2001 | IPCA | RBNIA | DSP 3019/2024 | R$ 2,311,544.73 | 6/1/2025 | Prevista | T2024-215 | Obra de Substituição Completa: Substituição do 2º Transformador de Potência Trifásico 230/69/13,8 kV de 60 MVA por um Transformador de Potência Trifásico 230/69/13,8 kV de 100 MVA na SE Ji-Paraná. | ||||
| AXIA Energia Norte | JI-PARANA | TR 230/69 kV JI-PARANA TR1 RO | RBF | FT TR 230/69 kV JI-PARANA TR1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$327,895.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JI-PARANA | TR 230/69 kV JI-PARANA TR1 RO | RBF | FT TR 230/69 kV JI-PARANA TR1 RO | 058/2001 | IPCA | RBNIA | DSP 3019/2024 | R$ 2,311,544.73 | 6/1/2025 | Prevista | T2024-152 | Obra de Substituição Completa: Substituição do 1º Transformador de Potência Trifásico 230/69/13,8 kV de 60 MVA por um Transformador de Potência Trifásico 230/69/13,8 kV de 100 MVA na SE Ji-Paraná. | ||||
| AXIA Energia Norte | JI-PARANA | TR 230/69 kV JI-PARANA TR1 RO | RBF | FT TR 230/69 kV JI-PARANA TR1 RO | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 12/19/2016 | 12/18/2031 | R$20,957.13 | 6/1/2025 | Ativa | Implantacao de sistema de medicao e monitoramento online de Buchas Condensivas do equipamento JPTF601 para integrar ao SISTEMA DE SUPERVISAO SAGE Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | JI-PARANA | TR 230/138 kV JI-PARANA TR3 RO | RBF | FT TR 230/138 kV JI-PARANA TR3 RO | 058/2001 | IPCA | RBNIA | DSP 3019/2024 | R$ 2,032,112.66 | 6/1/2025 | Prevista | T2024-153 | Instalar, na SE JI-PARANA, de uma transformação trifásica TR2 230/138-13,8 KV - 100 MVA. | ||||
| AXIA Energia Norte | JI-PARANA | TR 230/138 kV JI-PARANA TR2 RO | RBF | FT TR 230/138 kV JI-PARANA TR2 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$441,967.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JI-PARANA | TR 230/138 kV JI-PARANA TR1 RO | RBF | FT TR 230/138 kV JI-PARANA TR1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$441,967.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JI-PARANA | TR 230/138 kV JI-PARANA TR1 RO | RBF | FT TR 230/138 kV JI-PARANA TR1 RO | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 12/19/2016 | 12/18/2031 | R$20,957.13 | 6/1/2025 | Ativa | Implantacao de sistema de medicao e monitoramento online de Buchas Condensivas do equipamento JPAT601 para integrar ao SISTEMA DE SUPERVISAO SAGE Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | JI-PARANA | RTN 230 kV 0 Mvar JI-PARANA RN1 RO | RB | FT RTL 230 kV 20 Mvar JI-PARANA RT1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$16,446.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JI-PARANA | RTL 230 kV 20 Mvar JI-PARANA RT3 RO | RB | FT RTL 230 kV 20 Mvar JI-PARANA RT3 RO | 021/2009 | IPCA | RBL | CC 021/2009 | 10/28/2015 | 11/19/2039 | R$727,283.38 | 6/1/2025 | Ativa | T2009-245 | *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Norte | JI-PARANA | RTL 230 kV 20 Mvar JI-PARANA RT1 RO | RB | FT RTL 230 kV 20 Mvar JI-PARANA RT1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$257,883.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JI-PARANA | RTL 230 kV 20 Mvar JI-PARANA RT1 RO | RB | FT RTL 230 kV 20 Mvar JI-PARANA RT1 RO | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 9/30/2012 | 9/29/2027 | R$9,839.09 | 6/1/2025 | Ativa | IMPLANTACAO DEMONITOR DE BUCHAS P AUTOTRAFO TRAFO E REATORESTENSAO 230KV Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | JI-PARANA | RTL 230 kV 20 Mvar JI-PARANA RLR RO | RB | FT RTL 230 kV 20 Mvar JI-PARANA RLR RO | 058/2001 | IPCA | RBNI | REA 7814/2019 | 5/13/2021 | 8/29/2056 | R$939,168.85 | 6/1/2025 | Ativa | T2018-076 | Instalação de reator trifásico reserva na SE Ji-Paraná *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JI-PARANA | RTB 230 kV 20 Mvar JI-PARANA RT1 RO | RB | FT RTB 230 kV 20 Mvar JI-PARANA RT1 RO | 058/2001 | IPCA | RBNI | REA 2533/2010 | 6/6/2014 | 10/4/2049 | R$631,883.93 | 6/1/2025 | Ativa | T2009-087 | SE Ji-Paraná - Instalação de um reator de barra de 20 Mvar em 230kV. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JI-PARANA | MG 230 kV JI-PARANA MG1 RO | RB | FT MG 230 kV JI-PARANA MG1 RO | 058/2001 | IPCA | RBNI | REA 2533/2010 | 6/6/2014 | 6/5/2042 | R$173,107.81 | 6/1/2025 | Ativa | T2009-087 | SE Ji-Paraná - Complementação do módulo de infraestrutura geral, com a implantação de um módulo de infraestrutura e manobra em 230 kV. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JI-PARANA | MG 230 kV JI-PARANA MG1 RO | RB | FT MG 230 kV JI-PARANA MG1 RO | 058/2001 | IPCA | RBNI | REA 2533/2010 | 8/13/2019 | 1/14/2049 | R$213,144.43 | 6/1/2025 | Ativa | T2009-106 | SE Ji-Paraná - Acréscimo de Módulo de infraestrutura geral- pela instalação de um módulo de conexão em 230 kV, três módulos de conexão 69 kV um interligação de barramento. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JI-PARANA | MG 230 kV JI-PARANA MG1 RO | RB | FT MG 230 kV JI-PARANA MG1 RO | 058/2001 | IPCA | RBNI | REA 2533/2010 | 11/3/2015 | 1/26/2044 | R$397,006.85 | 6/1/2025 | Ativa | T2009-106 | SE Ji-Paraná: Realocação e reclassificãção dos módulos de conexão em 69 kV existente para serem utilizados como entradas de linha para os circuitos C1 e C2 de atendimeto a CERON. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JI-PARANA | MG 230 kV JI-PARANA MG1 RO | RB | FT MG 230 kV JI-PARANA MG1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$713,421.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JI-PARANA | MG 230 kV JI-PARANA MG1 RO | RB | FT MG 230 kV JI-PARANA MG1 RO | 058/2001 | IPCA | RBNI | REA 7814/2019 | 5/13/2021 | 11/30/2049 | R$10,217.01 | 6/1/2025 | Ativa | T2018-076 | MODULO DE INFRA-ESTRUTURA DE MANOBRA (500 KV - DJM)para instalação de Reator trifásico de reserva *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JI-PARANA | MG 230 kV JI-PARANA MG1 RO | RB | FT MG 230 kV JI-PARANA MG1 RO | 058/2001 | IPCA | RBNIA | DSP 3019/2024 | R$193,744.98 | 6/1/2025 | Prevista | T2024-153 | Módulo de Infraestrutura 230 kV associada à instalação do 3º Transformador de Potência Trifásico 230/138/13,8 kV de 100 MVA na SE Ji-Paraná | ||||
| AXIA Energia Norte | JI-PARANA | MG 230 kV JI-PARANA MG1 RO | RB | FT MG 230 kV JI-PARANA MG1 RO | 058/2001 | IPCA | RBNIA | DSP 3019/2024 | R$123,930.51 | 6/1/2025 | Prevista | T2024-153 | Módulo de Infraestrutura 138 kV associada à instalação do 3º Transformador de Potência Trifásico 230/138/13,8 kV de 100 MVA na SE Ji-Paraná | ||||
| AXIA Energia Norte | JI-PARANA | MG 230 kV JI-PARANA MG1 RO | RB | FT MG 230 kV JI-PARANA MG1 RO | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/18/2020 | 11/17/2037 | R$41,346.36 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | JI-PARANA | MG 230 kV JI-PARANA MG1 RO | RB | FT MG 230 kV JI-PARANA MG1 RO | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 8/3/2021 | 1/12/2050 | R$95,685.37 | 6/1/2025 | Ativa | MODERNIZAÇÃO -REGISTRADOR DIGITAL DE PERTURBACAORPV/REASON Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | JI-PARANA | MC 69 kV TR 230/69 kV JI-PARANA TR3 RO | RBF | FT TR 230/69 kV JI-PARANA TR3 RO | 058/2001 | IPCA | RBNI | REA 2533/2010 | 8/25/2014 | 4/24/2045 | R$374,717.35 | 6/1/2025 | Ativa | T2009-106 | SE Ji-Paraná: Instalação de um módulo de conexão, em 69 kV, arranjo barra principal e transferência, para o 3º transformador trifásico 230/69 kV de 60 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JI-PARANA | MC 69 kV TR 230/69 kV JI-PARANA TR2 RO | RBF | FT TR 230/69 kV JI-PARANA TR2 RO | 058/2001 | IPCA | RBNI | REA 2533/2010 | 11/3/2015 | 5/23/2046 | R$387,398.81 | 6/1/2025 | Ativa | T2009-106 | SE Ji-Paraná: Instalação de modulo de manobra,em 69 kV, arranjo do tipo barra principa e transferência, para o transformador TR2 230/69 kV. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JI-PARANA | MC 69 kV TR 230/69 kV JI-PARANA TR2 RO | RBF | FT TR 230/69 kV JI-PARANA TR2 RO | 058/2001 | IPCA | RBNIA | DSP 3019/2024 | R$557,449.17 | 6/1/2025 | Prevista | T2024-215 | Obra de Substituição Completa: Conexão de Transformador de Potência 69 kV - BPT referente ao 2º Transformador de Potência Trifásico 230/69/13,8 kV de 100 MVA na SE Ji-Paraná. | ||||
| AXIA Energia Norte | JI-PARANA | MC 69 kV TR 230/69 kV JI-PARANA TR1 RO | RBF | FT TR 230/69 kV JI-PARANA TR1 RO | 058/2001 | IPCA | RBNI | REA 2533/2010 | 6/7/2019 | 10/17/2050 | R$561,133.98 | 6/1/2025 | Ativa | T2009-106 | SE Ji-Paraná: Instalação de modulo de manobra,em 69 kV, arranjo do tipo barra principa e transferência, para o transformador TR1 230/69 kV. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JI-PARANA | MC 69 kV TR 230/69 kV JI-PARANA TR1 RO | RBF | FT TR 230/69 kV JI-PARANA TR1 RO | 058/2001 | IPCA | RBNIA | DSP 3019/2024 | R$557,449.17 | 6/1/2025 | Prevista | T2024-152 | Obra de Substituição Completa: Conexão de Transformador de Potência 69 kV - BPT referente ao 1º Transformador de Potência Trifásico 230/69/13,8 kV de 100 MVA na SE Ji-Paraná. | ||||
| AXIA Energia Norte | JI-PARANA | MC 230 kV TR 230/69 kV JI-PARANA TR3 RO | RBF | FT TR 230/69 kV JI-PARANA TR3 RO | 058/2001 | IPCA | RBNI | REA 2533/2010 | 8/25/2014 | 3/5/2046 | R$947,672.53 | 6/1/2025 | Ativa | T2009-106 | SE Ji-Paraná - Instalação de módulo de conexão, em 230 kV, arranjo barra dupla a quatro chaves, para o 3º transfomador 230/69 kV de 60 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JI-PARANA | MC 230 kV TR 230/69 kV JI-PARANA TR2 RO | RBF | FT TR 230/69 kV JI-PARANA TR2 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$183,181.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JI-PARANA | MC 230 kV TR 230/69 kV JI-PARANA TR2 RO | RBF | FT TR 230/69 kV JI-PARANA TR2 RO | 058/2001 | IPCA | RBNIA | DSP 3019/2024 | R$ 1,549,788.80 | 6/1/2025 | Prevista | T2024-215 | Obra de Substituição Completa: Conexão de Transformador de Potência 230 kV - BD4 referente ao 2º Transformador de Potência Trifásico 230/69/13,8 kV de 100 MVA na SE Ji-Paraná. | ||||
| AXIA Energia Norte | JI-PARANA | MC 230 kV TR 230/69 kV JI-PARANA TR1 RO | RBF | FT TR 230/69 kV JI-PARANA TR1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$183,181.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JI-PARANA | MC 230 kV TR 230/69 kV JI-PARANA TR1 RO | RBF | FT TR 230/69 kV JI-PARANA TR1 RO | 058/2001 | IPCA | RBNIA | DSP 3019/2024 | R$ 1,549,788.80 | 6/1/2025 | Prevista | T2024-152 | Obra de Substituição Completa: Conexão de Transformador de Potência 230 kV - BD4 referente ao 1º Transformador de Potência Trifásico 230/69/13,8 kV de 100 MVA na SE Ji-Paraná. | ||||
| AXIA Energia Norte | JI-PARANA | MC 230 kV TR 230/138 kV JI-PARANA TR3 RO | RBF | FT TR 230/138 kV JI-PARANA TR3 RO | 058/2001 | IPCA | RBNIA | DSP 3019/2024 | R$ 1,669,989.79 | 6/1/2025 | Prevista | T2024-153 | Instalar, na SE JI-PARANA, um módulo de conexão, em 230 kV, para o transformador trifásico TR2 230/138 kV - 100 MVA, arranjo Barra Dupla a Quatro Chaves. | ||||
| AXIA Energia Norte | JI-PARANA | MC 230 kV TR 230/138 kV JI-PARANA TR2 RO | RBF | FT TR 230/138 kV JI-PARANA TR2 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$183,181.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JI-PARANA | MC 230 kV TR 230/138 kV JI-PARANA TR1 RO | RBF | FT TR 230/138 kV JI-PARANA TR1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$183,181.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JI-PARANA | MC 230 kV RTL 230 kV 20 Mvar JI-PARANA RT3 RO | RB | FT RTL 230 kV 20 Mvar JI-PARANA RT3 RO | 021/2009 | IPCA | RBL | CC 021/2009 | 10/28/2015 | 11/19/2039 | R$241,329.42 | 6/1/2025 | Ativa | T2009-245 | *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Norte | JI-PARANA | MC 230 kV RTL 230 kV 20 Mvar JI-PARANA RT1 RO | RB | FT RTL 230 kV 20 Mvar JI-PARANA RT1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$109,485.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JI-PARANA | MC 230 kV RTB 230 kV 20 Mvar JI-PARANA RT1 RO | RB | FT RTB 230 kV 20 Mvar JI-PARANA RT1 RO | 058/2001 | IPCA | RBNI | REA 2533/2010 | 6/6/2014 | 7/28/2044 | R$905,498.75 | 6/1/2025 | Ativa | T2009-087 | SE Ji- Paraná - Instalação de módulo de conexão em 230 kV para o reator de barra de 20 Mvar. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JI-PARANA | MC 230 kV BC 230 kV 18,5 Mvar JI-PARANA BC3 RO | RB | FT BC 230 kV 18,5 Mvar JI-PARANA BC3 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$207,718.21 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JI-PARANA | MC 230 kV BC 230 kV 18,5 Mvar JI-PARANA BC2 RO | RB | FT BC 230 kV 18,5 Mvar JI-PARANA BC2 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$207,718.21 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JI-PARANA | MC 230 kV BC 230 kV 18,5 Mvar JI-PARANA BC1 RO | RB | FT BC 230 kV 18,5 Mvar JI-PARANA BC1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$207,718.21 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JI-PARANA | MC 138 kV TR 230/138 kV JI-PARANA TR3 RO | RBF | FT TR 230/138 kV JI-PARANA TR3 RO | 058/2001 | IPCA | RBNIA | DSP 3019/2024 | R$ 1,188,345.41 | 6/1/2025 | Prevista | T2024-153 | Instalar, na SE JI-PARANA, um módulo de conexão, em 138 kV, para o transformador trifásico TR2 230/138 kV - 100 MVA, arranjo Barra Principal e Transferência. | ||||
| AXIA Energia Norte | JI-PARANA | MC 138 kV TR 230/138 kV JI-PARANA TR2 RO | RBF | FT TR 230/138 kV JI-PARANA TR2 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,943.07 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JI-PARANA | MC 138 kV TR 230/138 kV JI-PARANA TR1 RO | RBF | FT TR 230/138 kV JI-PARANA TR1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,943.07 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JI-PARANA | IB 69 kV MG 230 kV JI-PARANA MG1 RO IB1 | DIT | 058/2001 | IPCA | RCDM | REA 2533/2010 | 11/3/2015 | 9/30/2047 | R$310,421.39 | 6/1/2025 | Ativa | T2009-106 | SE Ji-Paraná: Instalação de uma interligação de barrameto, em 69 kV, arranjo do tipo barra principal e transferência. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | JI-PARANA | IB 230 kV MG 230 kV JI-PARANA MG1 RO IB1 | RB | FT MG 230 kV JI-PARANA MG1 RO | 058/2001 | IPCA | RBNI | REA 2533/2010 | 8/25/2014 | 11/17/2042 | R$8,895.22 | 6/1/2025 | Ativa | T2009-106 | SE Ji-Paraná: Adequação do Módulo de Interligação de Barramentos 230 kV, arranjo do tipo barra dupla aquato chaves, associado a substituição do Sistema de Proteção Diferencial de Barras. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | JI-PARANA | IB 230 kV MG 230 kV JI-PARANA MG1 RO IB1 | RB | FT MG 230 kV JI-PARANA MG1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$158,618.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JI-PARANA | IB 138 kV MG 230 kV JI-PARANA MG1 RO IB1 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$103,483.77 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | JI-PARANA | EL 69 kV JI-PARANA DIST2 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$87,355.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | JI-PARANA | EL 69 kV JI-PARANA DIST1 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$87,355.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | JI-PARANA | EL 230 kV JI-PARANA LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO | RB | FT LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO | 021/2009 | IPCA | RBL | CC 021/2009 | 10/28/2015 | 11/19/2039 | R$736,472.88 | 6/1/2025 | Ativa | T2009-245 | *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Norte | JI-PARANA | EL 230 kV JI-PARANA LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO | RB | FT LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$260,258.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JI-PARANA | EL 230 kV JI-PARANA LT 230 kV JARU /JI-PARANA C-1 RO | RB | FT LT 230 kV JARU /JI-PARANA C-1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$260,258.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JI-PARANA | EL 230 kV JI-PARANA LT 230 kV ARIQUEMES /JI-PARANA C-3 RO | RB | FT LT 230 kV ARIQUEMES /JI-PARANA C-3 RO | 021/2009 | IPCA | RBL | CC 021/2009 | 10/28/2015 | 11/19/2039 | R$736,472.88 | 6/1/2025 | Ativa | T2009-245 | *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Norte | JI-PARANA | EL 138 kV JI-PARANA ROLIM MOURA C1 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$199,721.76 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | JI-PARANA | BC 230 kV 18,5 Mvar JI-PARANA BC3 RO | RB | FT BC 230 kV 18,5 Mvar JI-PARANA BC3 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$130,999.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JI-PARANA | BC 230 kV 18,5 Mvar JI-PARANA BC2 RO | RB | FT BC 230 kV 18,5 Mvar JI-PARANA BC2 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$130,999.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | JI-PARANA | BC 230 kV 18,5 Mvar JI-PARANA BC1 RO | RB | FT BC 230 kV 18,5 Mvar JI-PARANA BC1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$130,999.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JOAIRAM | TT 69/0 kV JOAIRAM TA2 PE | DIT | 061/2001 | IPCA | RCDM | REA 2837/2011 | 4/27/2014 | 11/19/2044 | R$162,416.23 | 6/1/2025 | Ativa | Instalação de 2a. unidade de Transformador de Aterramento, de impedância não superior a 20 Ohms/fase, em paralelo com o TT 02A1 existente de 20 Ohms/fase. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | JOAIRAM | TT 69/0 kV JOAIRAM TA1 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JOAIRAM | TR 69/13,8 kV JOAIRAM TR1 PE | RB | FT MG 230 kV JOAIRAM MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JOAIRAM | TR 230/69 kV JOAIRAM TR3 PE | RBF | FT TR 230/69 kV JOAIRAM TR3 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$415,381.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JOAIRAM | TR 230/69 kV JOAIRAM TR2 PE | RBF | FT TR 230/69 kV JOAIRAM TR2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$415,381.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JOAIRAM | TR 230/69 kV JOAIRAM TR1 PE | RBF | FT TR 230/69 kV JOAIRAM TR1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$415,381.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JOAIRAM | MG 230 kV JOAIRAM MG1 PE | RB | FT MG 230 kV JOAIRAM MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$575,241.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JOAIRAM | MG 230 kV JOAIRAM MG1 PE | RB | FT MG 230 kV JOAIRAM MG1 PE | 061/2001 | IPCA | RBNI | REA 1814/2009 | 9/30/2012 | 9/29/2042 | R$20,450.58 | 6/1/2025 | Ativa | Complementação do módulo geral com um módulo de infraestrutura de manobra associado a entrada de linha em 69 kV para SE Tejipió. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JOAIRAM | MG 230 kV JOAIRAM MG1 PE | RB | FT MG 230 kV JOAIRAM MG1 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/30/2013 | 9/29/2030 | R$2,178.23 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCOS DE BATERIAS -48Vcc. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JOAIRAM | MG 230 kV JOAIRAM MG1 PE | RB | FT MG 230 kV JOAIRAM MG1 PE | 061/2001 | IPCA | RMEL | REN 443/2011 | 4/4/2016 | 4/3/2044 | R$ 400.66 | 6/1/2025 | Ativa | Revitalização Necessária: Implantação de Switches Industriais * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JOAIRAM | MG 230 kV JOAIRAM MG1 PE | RB | FT MG 230 kV JOAIRAM MG1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/26/2021 | 4/5/2038 | R$269,614.06 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JOAIRAM | MC 69 kV TT 69/0 kV JOAIRAM TA2 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JOAIRAM | MC 69 kV TT 69/0 kV JOAIRAM TA1 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JOAIRAM | MC 69 kV TR 69/13,8 kV JOAIRAM TR1 PE | RB | FT MG 230 kV JOAIRAM MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JOAIRAM | MC 69 kV TR 230/69 kV JOAIRAM TR3 PE | RBF | FT TR 230/69 kV JOAIRAM TR3 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JOAIRAM | MC 69 kV TR 230/69 kV JOAIRAM TR2 PE | RBF | FT TR 230/69 kV JOAIRAM TR2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JOAIRAM | MC 69 kV TR 230/69 kV JOAIRAM TR1 PE | RBF | FT TR 230/69 kV JOAIRAM TR1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JOAIRAM | MC 230 kV TR 230/69 kV JOAIRAM TR3 PE | RBF | FT TR 230/69 kV JOAIRAM TR3 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,694.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JOAIRAM | MC 230 kV TR 230/69 kV JOAIRAM TR3 PE | RBF | FT TR 230/69 kV JOAIRAM TR3 PE | 061/2001 | IPCA | RMEL | REN 443/2011 | 10/18/2017 | 10/21/2047 | R$1,726.28 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE ISOLADORES DE VIDRO POR PORCELANA, EM ATENDIMENTO A RECOMENDAÇÃO RAP ONS 0053/2013, DA CHAVE SECCIONADORA, POSIÇÃO 34T3-6 DA SE JOAIRAM * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JOAIRAM | MC 230 kV TR 230/69 kV JOAIRAM TR3 PE | RBF | FT TR 230/69 kV JOAIRAM TR3 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/2/2022 | 6/7/2039 | R$3,961.70 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JOAIRAM | MC 230 kV TR 230/69 kV JOAIRAM TR2 PE | RBF | FT TR 230/69 kV JOAIRAM TR2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,694.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JOAIRAM | MC 230 kV TR 230/69 kV JOAIRAM TR1 PE | RBF | FT TR 230/69 kV JOAIRAM TR1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,694.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JOAIRAM | MC 230 kV TR 230/69 kV JOAIRAM TR1 PE | RBF | FT TR 230/69 kV JOAIRAM TR1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/13/2022 | 9/12/2037 | R$4,343.97 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JOAIRAM | IB 69 kV MG 230 kV JOAIRAM MG1 PE IB2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JOAIRAM | IB 230 kV MG 230 kV JOAIRAM MG1 PE IB1 | RB | FT MG 230 kV JOAIRAM MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,085.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JOAIRAM | IB 230 kV MG 230 kV JOAIRAM MG1 PE IB1 | RB | FT MG 230 kV JOAIRAM MG1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/31/2018 | 10/30/2033 | R$6,266.20 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JOAIRAM | EL 69 kV JOAIRAM VARZEA C2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JOAIRAM | EL 69 kV JOAIRAM VARZEA C2 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/17/2015 | 5/16/2039 | R$1,972.05 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE PARARAIOS, POSIÇÃO 72M5 FASES A,B E C DA SUB JOAIRAM * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | JOAIRAM | EL 69 kV JOAIRAM VARZEA C1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JOAIRAM | EL 69 kV JOAIRAM TEJIPIO | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 9/30/2012 | 1/14/2045 | R$362,439.17 | 6/1/2025 | Ativa | Receita referente a uma EL 69 kV para SE Tejipió. Incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | JOAIRAM | EL 69 kV JOAIRAM JOBOTAO C2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JOAIRAM | EL 69 kV JOAIRAM JOBOTAO C1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JOAIRAM | EL 230 kV JOAIRAM LT 230 kV RECIFE II /JOAIRAM C-3 PE | RB | FT LT 230 kV RECIFE II /JOAIRAM C-3 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JOAIRAM | EL 230 kV JOAIRAM LT 230 kV RECIFE II /JOAIRAM C-3 PE | RB | FT LT 230 kV RECIFE II /JOAIRAM C-3 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/27/2020 | 3/26/2035 | R$10,610.18 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JOAIRAM | EL 230 kV JOAIRAM LT 230 kV RECIFE II /JOAIRAM C-2 PE | RB | FT LT 230 kV RECIFE II /JOAIRAM C-2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JOAIRAM | EL 230 kV JOAIRAM LT 230 kV RECIFE II /JOAIRAM C-2 PE | RB | FT LT 230 kV RECIFE II /JOAIRAM C-2 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/31/2018 | 10/30/2033 | R$6,266.20 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JOAIRAM | EL 230 kV JOAIRAM LT 230 kV RECIFE II /JOAIRAM C-1 PE | RB | FT LT 230 kV RECIFE II /JOAIRAM C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JOAIRAM | EL 230 kV JOAIRAM LT 230 kV RECIFE II /JOAIRAM C-1 PE | RB | FT LT 230 kV RECIFE II /JOAIRAM C-1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/27/2020 | 3/26/2035 | R$10,610.18 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JOAIRAM | EL 230 kV JOAIRAM LT 230 kV BONGI /JOAIRAM C-3 PE | RB | FT LT 230 kV BONGI /JOAIRAM C-3 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JOAIRAM | EL 230 kV JOAIRAM LT 230 kV BONGI /JOAIRAM C-3 PE | RB | FT LT 230 kV BONGI /JOAIRAM C-3 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/13/2022 | 9/12/2037 | R$4,343.96 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JOAIRAM | EL 230 kV JOAIRAM LT 230 kV BONGI /JOAIRAM C-2 PE | RB | FT LT 230 kV BONGI /JOAIRAM C-2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JOAIRAM | EL 230 kV JOAIRAM LT 230 kV BONGI /JOAIRAM C-1 PE | RB | FT LT 230 kV BONGI /JOAIRAM C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JOAIRAM | EL 230 kV JOAIRAM LT 230 kV BONGI /JOAIRAM C-1 PE | RB | FT LT 230 kV BONGI /JOAIRAM C-1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/13/2022 | 9/12/2037 | R$4,343.97 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JOAO CAMARA II | TT 69/0 kV JOAO CAMARA II TT1 RN | ICG | 019/2010 | IPCA | RICG | CC 019/2010 | 2/28/2014 | 6/30/2032 | R$75,310.40 | 6/1/2025 | Ativa | T2010-090-A | ICGSE João Câmara 230/69 kV - 360 MVA (ICG). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | JOAO CAMARA II | TR 230/69 kV JOAO CAMARA II TR3 RN | ICG | 019/2010 | IPCA | RICGNI | REA 4445/2013 | 10/29/2017 | 6/30/2032 | R$ 2,016,024.30 | 6/1/2025 | Ativa | T2013-084 | Instalação, na subestação João Câmara II, do terceirotransformador trifásico 230/69 kV, de 180 MVA. *(Receita revisada em 21/06/2021) | |||
| AXIA Energia Nordeste | JOAO CAMARA II | TR 230/69 kV JOAO CAMARA II TR2 RN | ICG | 019/2010 | IPCA | RICG | CC 019/2010 | 2/28/2014 | 6/30/2032 | R$699,271.23 | 6/1/2025 | Ativa | T2010-090-A | ICGSE João Câmara 230/69 kV - 360 MVA (ICG). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | JOAO CAMARA II | TR 230/69 kV JOAO CAMARA II TR1 RN | ICG | 019/2010 | IPCA | RICG | CC 019/2010 | 2/28/2014 | 6/30/2032 | R$699,271.23 | 6/1/2025 | Ativa | T2010-090-A | ICGSE João Câmara 230/69 kV - 360 MVA (ICG). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | JOAO CAMARA II | MG 230 kV JOAO CAMARA II MG1 RN | RB | FT MG 230 kV JOAO CAMARA II MG1 RN | 019/2010 | IPCA | RBL | CC 019/2010 | 2/17/2014 | 11/23/2040 | R$585,514.28 | 6/1/2025 | Ativa | T2010-090-A | Rede Básica e ICGLT, CS, 230 kV Extremoz II - João Câmara; SE Extremoz II 230 kV; SE João Câmara 230/69 kV - 360 MVA (Rede Básica). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | JOAO CAMARA II | MG 230 kV JOAO CAMARA II MG1 RN | RB | FT MG 230 kV JOAO CAMARA II MG1 RN | 019/2010 | IPCA | RBNI | REA 4445/2013 | 5/15/2020 | 5/15/2052 | R$416,184.99 | 6/1/2025 | Ativa | T2013-082 | Complementação do módulo geral em 230 kV da Subestação João Câmara II com três módulos de infraestrutura de manobra em 230 kV. *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Nordeste | JOAO CAMARA II | MG 230 kV JOAO CAMARA II MG1 RN | RB | FT MG 230 kV JOAO CAMARA II MG1 RN | 019/2010 | IPCA | RBNI | REA 4445/2013 | 10/29/2017 | 10/29/2046 | R$39,909.19 | 6/1/2025 | Ativa | T2013-084 | Complementação do módulo geral da subestação João Câmara II com um módulo de infraestrutura de manobra em 69 kV. *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Nordeste | JOAO CAMARA II | MG 230 kV JOAO CAMARA II MG1 RN | RB | FT MG 230 kV JOAO CAMARA II MG1 RN | 019/2010 | IPCA | RBNI | REN 443/2011 | 2/27/2014 | 2/26/2045 | R$5,449.57 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de complementação do módulo geral da Subestação João Câmara II com dois módulos de infraestrutura de manobra referentes a 01 (uma) EL 69 kV JOÃO CÂMARA II (EOL SANTA CLARA I) e 01 (uma) EL 69 kV JOÃO CÂMARA II (EOL SANTA CLARA II).Incluído no reajuste ciclo 2015-2016. * Receita Revisada no reajuste do ciclo 2016-2017 *(Receita revisada em 21/06/2021) | |||
| AXIA Energia Nordeste | JOAO CAMARA II | MG 230 kV JOAO CAMARA II MG1 RN | RB | FT MG 230 kV JOAO CAMARA II MG1 RN | 019/2010 | IPCA | RMEL | REN 643/2014 | 3/31/2015 | 3/30/2030 | R$42,823.82 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE ACESSO REMOTO A DISPOSITIVOS DE PROTEÇÃO.Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 21/06/2021) | |||
| AXIA Energia Nordeste | JOAO CAMARA II | MG 230 kV JOAO CAMARA II MG1 RN | RB | FT MG 230 kV JOAO CAMARA II MG1 RN | 019/2010 | IPCA | RBNI | REN 443/2011 | 3/31/2015 | 3/30/2030 | R$39,158.11 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE ACESSO REMOTO A DISPOSITIVOS DE PROTEÇÃO. Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 21/06/2021) | |||
| AXIA Energia Nordeste | JOAO CAMARA II | MG 230 kV JOAO CAMARA II MG1 RN | RB | FT MG 230 kV JOAO CAMARA II MG1 RN | 019/2010 | IPCA | RBNI | REA 8314/2019 | 8/31/2018 | 8/30/2033 | R$10,832.32 | 6/1/2025 | Ativa | Substituição do Concentrador de Dados (Sistema SCADA) para atendimento ao aumento da observabilidade associada ao Procedimento de Rede 2.7. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 | |||
| AXIA Energia Nordeste | JOAO CAMARA II | MC 69 kV TT 69/0 kV JOAO CAMARA II TT1 RN | ICG | 019/2010 | IPCA | RICG | CC 019/2010 | 2/28/2014 | 6/30/2032 | R$58,248.36 | 6/1/2025 | Ativa | T2010-090-A | ICGSE João Câmara 230/69 kV - 360 MVA (ICG). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | JOAO CAMARA II | MC 69 kV TR 230/69 kV JOAO CAMARA II TR3 RN | ICG | 019/2010 | IPCA | RICGNI | REA 4445/2013 | 10/29/2017 | 6/30/2032 | R$435,365.26 | 6/1/2025 | Ativa | T2013-084 | Instalação, na subestação João Câmara II de um módulo de conexão de transformador em 69 kV, arranjo barra principal e transferência. *(Receita revisada em 21/06/2021) | |||
| AXIA Energia Nordeste | JOAO CAMARA II | MC 69 kV TR 230/69 kV JOAO CAMARA II TR2 RN | ICG | 019/2010 | IPCA | RICG | CC 019/2010 | 2/28/2014 | 6/30/2032 | R$136,570.70 | 6/1/2025 | Ativa | T2010-090-A | ICGSE João Câmara 230/69 kV - 360 MVA (ICG). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | JOAO CAMARA II | MC 69 kV TR 230/69 kV JOAO CAMARA II TR1 RN | ICG | 019/2010 | IPCA | RICG | CC 019/2010 | 2/28/2014 | 6/30/2032 | R$136,570.70 | 6/1/2025 | Ativa | T2010-090-A | ICGSE João Câmara 230/69 kV - 360 MVA (ICG). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | JOAO CAMARA II | MC 69 kV BC 69 kV 21,3 Mvar JOAO CAMARA II BC4 RN | ICG | 019/2010 | IPCA | RICG | CC 019/2010 | 2/28/2014 | 6/30/2032 | R$165,839.48 | 6/1/2025 | Ativa | T2010-090-A | ICGSE João Câmara 230/69 kV - 360 MVA (ICG). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | JOAO CAMARA II | MC 69 kV BC 69 kV 21,3 Mvar JOAO CAMARA II BC3 RN | ICG | 019/2010 | IPCA | RICG | CC 019/2010 | 2/28/2014 | 6/30/2032 | R$165,839.48 | 6/1/2025 | Ativa | T2010-090-A | ICGSE João Câmara 230/69 kV - 360 MVA (ICG). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | JOAO CAMARA II | MC 69 kV BC 69 kV 21,3 Mvar JOAO CAMARA II BC2 RN | ICG | 019/2010 | IPCA | RICG | CC 019/2010 | 2/28/2014 | 6/30/2032 | R$165,839.48 | 6/1/2025 | Ativa | T2010-090-A | ICGSE João Câmara 230/69 kV - 360 MVA (ICG). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | JOAO CAMARA II | MC 69 kV BC 69 kV 21,3 Mvar JOAO CAMARA II BC1 RN | ICG | 019/2010 | IPCA | RICG | CC 019/2010 | 2/28/2014 | 6/30/2032 | R$165,839.48 | 6/1/2025 | Ativa | T2010-090-A | ICGSE João Câmara 230/69 kV - 360 MVA (ICG). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | JOAO CAMARA II | MC 230 kV TR 230/69 kV JOAO CAMARA II TR3 RN | ICG | 019/2010 | IPCA | RICGNI | REA 4445/2013 | 10/29/2017 | 6/30/2032 | R$ 1,179,647.00 | 6/1/2025 | Ativa | T2013-084 | Módulo de conexão de transformador em 230 kV, arranjo barra dupla a quatro chaves. *(Receita revisada em 21/06/2021) | |||
| AXIA Energia Nordeste | JOAO CAMARA II | MC 230 kV TR 230/69 kV JOAO CAMARA II TR2 RN | ICG | 019/2010 | IPCA | RICG | CC 019/2010 | 2/28/2014 | 6/30/2032 | R$335,666.70 | 6/1/2025 | Ativa | T2010-090-A | ICGSE João Câmara 230/69 kV - 360 MVA (ICG). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | JOAO CAMARA II | MC 230 kV TR 230/69 kV JOAO CAMARA II TR1 RN | ICG | 019/2010 | IPCA | RICG | CC 019/2010 | 2/28/2014 | 6/30/2032 | R$335,666.70 | 6/1/2025 | Ativa | T2010-090-A | ICGSE João Câmara 230/69 kV - 360 MVA (ICG). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | JOAO CAMARA II | MC 230 kV BC 230 kV 50 Mvar JOAO CAMARA II BC6 RN | RB | FT BC 230 kV 50 Mvar JOAO CAMARA II BC6 RN | 019/2010 | IPCA | RBNI | REA 4445/2013 | 11/16/2017 | 11/16/2043 | R$ 1,217,359.54 | 6/1/2025 | Ativa | T2013-082 | Instalação, na SE João Câmara II, de um módulo de conexão de banco de capacitores, arranjo barra dupla a quatro chaves. *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Nordeste | JOAO CAMARA II | MC 230 kV BC 230 kV 50 Mvar JOAO CAMARA II BC5 RN | RB | FT BC 230 kV 50 Mvar JOAO CAMARA II BC5 RN | 019/2010 | IPCA | RBNI | REA 4445/2013 | 11/26/2017 | 11/26/2043 | R$ 1,217,368.94 | 6/1/2025 | Ativa | T2013-082 | Instalação, na SE João Câmara II, de um módulo de conexão de banco de capacitores, arranjo barra dupla a quatro chaves *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Nordeste | JOAO CAMARA II | IB 69 kV MG 230 kV JOAO CAMARA II MG1 RN IB1 | ICG | 019/2010 | IPCA | RICG | CC 019/2010 | 2/28/2014 | 6/30/2032 | R$93,125.00 | 6/1/2025 | Ativa | T2010-090-A | ICGSE João Câmara 230/69 kV - 360 MVA (ICG). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | JOAO CAMARA II | IB 230 kV MG 230 kV JOAO CAMARA II MG1 RN IB1 | RB | FT MG 230 kV JOAO CAMARA II MG1 RN | 019/2010 | IPCA | RBL | CC 019/2010 | 2/17/2014 | 11/23/2040 | R$210,589.86 | 6/1/2025 | Ativa | T2010-090-A | Rede Básica e ICGLT, CS, 230 kV Extremoz II - João Câmara; SE Extremoz II 230 kV; SE João Câmara 230/69 kV - 360 MVA (Rede Básica). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | JOAO CAMARA II | EL 69 kV JOAO CAMARA II 02P4 | ICG | 019/2010 | IPCA | RICGNI | REN 443/2011 | 2/27/2014 | 6/30/2032 | R$47,550.11 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 01 (uma) EL 69 kV JOÃO CÂMARA II (EOL SANTA CLARA II).Incluído no reajuste ciclo 2015-2016. * Receita Revisada no reajuste do ciclo 2016-2017 *(Receita revisada em 21/06/2021) | ||||
| AXIA Energia Nordeste | JOAO CAMARA II | EL 69 kV JOAO CAMARA II 02P3 | ICG | 019/2010 | IPCA | RICGNI | REN 443/2011 | 2/27/2014 | 6/30/2032 | R$47,550.11 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 01 (uma) EL 69 kV JOÃO CÂMARA II (EOL SANTA CLARA I).Incluído no reajuste ciclo 2015-2016. * Receita Revisada no reajuste do ciclo 2016-2017 *(Receita revisada em 21/06/2021) | ||||
| AXIA Energia Nordeste | JOAO CAMARA II | EL 230 kV JOAO CAMARA II UNI. DOS VENTOS | DIT | 061/2001 | IPCA | RCDM | REA 6675/2017 | 2/28/2014 | 12/31/2042 | R$66,665.96 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha - EL 230 kV, arranjo BD4, na SE João Câmara II, associada à linha de transmissão LT 230 kV Joao câmara II - União dos Ventos *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | JOAO CAMARA II | EL 230 kV JOAO CAMARA II LT 230 kV CEARA MIRIM II /JOAO CAMARA II C-1 RN | RB | FT LT 230 kV CEARA MIRIM II /JOAO CAMARA II C-1 RN | 019/2010 | IPCA | RBL | CC 019/2010 | 2/17/2014 | 11/23/2040 | R$391,912.21 | 6/1/2025 | Ativa | T2010-090-A | Rede Básica e ICGLT, CS, 230 kV Extremoz II - João Câmara; SE Extremoz II 230 kV; SE João Câmara 230/69 kV - 360 MVA (Rede Básica). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | JOAO CAMARA II | BC 69 kV 21,3 Mvar JOAO CAMARA II BC4 RN | ICG | 019/2010 | IPCA | RICG | CC 019/2010 | 2/28/2014 | 6/30/2032 | R$235,442.24 | 6/1/2025 | Ativa | T2010-090-A | ICGSE João Câmara 230/69 kV - 360 MVA (ICG). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | JOAO CAMARA II | BC 69 kV 21,3 Mvar JOAO CAMARA II BC3 RN | ICG | 019/2010 | IPCA | RICG | CC 019/2010 | 2/28/2014 | 6/30/2032 | R$235,442.24 | 6/1/2025 | Ativa | T2010-090-A | ICGSE João Câmara 230/69 kV - 360 MVA (ICG). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | JOAO CAMARA II | BC 69 kV 21,3 Mvar JOAO CAMARA II BC2 RN | ICG | 019/2010 | IPCA | RICG | CC 019/2010 | 2/28/2014 | 6/30/2032 | R$235,442.24 | 6/1/2025 | Ativa | T2010-090-A | ICGSE João Câmara 230/69 kV - 360 MVA (ICG). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | JOAO CAMARA II | BC 69 kV 21,3 Mvar JOAO CAMARA II BC1 RN | ICG | 019/2010 | IPCA | RICG | CC 019/2010 | 2/28/2014 | 6/30/2032 | R$235,442.24 | 6/1/2025 | Ativa | T2010-090-A | ICGSE João Câmara 230/69 kV - 360 MVA (ICG). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | JOAO CAMARA II | BC 230 kV 50 Mvar JOAO CAMARA II BC6 RN | RB | FT BC 230 kV 50 Mvar JOAO CAMARA II BC6 RN | 019/2010 | IPCA | RBNI | REA 4445/2013 | 11/16/2017 | 11/16/2037 | R$397,650.87 | 6/1/2025 | Ativa | T2013-082 | Instalação, na SE João Câmara II, de um banco de capacitores de 50,5 Mvar, em 230 kV. *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Nordeste | JOAO CAMARA II | BC 230 kV 50 Mvar JOAO CAMARA II BC5 RN | RB | FT BC 230 kV 50 Mvar JOAO CAMARA II BC5 RN | 019/2010 | IPCA | RBNI | REA 4445/2013 | 11/26/2017 | 11/26/2037 | R$397,654.90 | 6/1/2025 | Ativa | T2013-082 | Instalação, na SE João Câmara II, de um banco de capacitores de 50,5 Mvar, em 230 kV. *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Nordeste | JOAO CAMARA III | TR 500/138 kV JOAO CAMARA III TRR1 RN | ICG | 008/2011 | IPCA | RICG | CC 008/2011 | 10/13/2014 | 10/12/2032 | R$997,672.32 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | JOAO CAMARA III | TR 500/138 kV JOAO CAMARA III TR2 RN | ICG | 008/2011 | IPCA | RICG | CC 008/2011 | 10/13/2014 | 10/12/2032 | R$ 2,993,018.34 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | JOAO CAMARA III | TR 500/138 kV JOAO CAMARA III TR1 RN | ICG | 008/2011 | IPCA | RICG | CC 008/2011 | 10/13/2014 | 10/12/2032 | R$ 2,993,018.34 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | JOAO CAMARA III | TR 500/138 kV JOAO CAMARA III ATR4 RN | ICG | 008/2011 | IPCA | RICGNI | REA 4443/2013 | 3/14/2016 | 10/12/2032 | R$ 5,171,806.75 | 6/1/2025 | Ativa | T2013-078 | Instalação, na subestação João Câmara III, do quarto banco de autotransformadores monofásicos 500/138 kV, de 3 x 150 MVA.*Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Nordeste | JOAO CAMARA III | TR 500/138 kV JOAO CAMARA III ATR3 RN | ICG | 008/2011 | IPCA | RICGNI | REA 4443/2013 | 3/14/2016 | 10/12/2032 | R$ 5,171,806.75 | 6/1/2025 | Ativa | T2013-077 | Instalação, na subestação João Câmara III, de umbanco de autotransformadores monofásicos 500/138 kV, de 3 x 150 MVA.*Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Nordeste | JOAO CAMARA III | RTB 500 kV 50 Mvar JOAO CAMARA III RTBR1 RN | RB | FT RTB 500 kV 50 Mvar JOAO CAMARA III RTBR1 RN | 008/2011 | IPCA | RBNI | REA 4443/2013 | 3/14/2016 | 3/13/2052 | R$812,064.80 | 6/1/2025 | Ativa | T2013-085 | Instalação, na SE João Câmara III, de um reator de barra monofásico, em 500 kV, de 50 Mvar, com finalidade de reserva.*Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | JOAO CAMARA III | RTB 500 kV 150 Mvar JOAO CAMARA III RTB1 RN | RB | FT RTB 500 kV 150 Mvar JOAO CAMARA III RTB1 RN | 008/2011 | IPCA | RBNI | REA 4443/2013 | 3/14/2016 | 3/13/2052 | R$ 2,436,194.39 | 6/1/2025 | Ativa | T2013-085 | Instalação, na SE João Câmara III, de três reatores de barra monofásicos, em 500 kV, de 3 x 50 Mvar*Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | JOAO CAMARA III | MG 500 kV JOAO CAMARA III MG1 RN | RB | FT MG 500 kV JOAO CAMARA III MG1 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$785,028.39 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | JOAO CAMARA III | MG 500 kV JOAO CAMARA III MG1 RN | RB | FT MG 500 kV JOAO CAMARA III MG1 RN | 008/2011 | IPCA | RBNI | REA 4443/2013 | 3/14/2016 | 3/13/2031 | R$38,570.29 | 6/1/2025 | Ativa | T2013-077 | Complementação do módulo geral da subestação João Câmara III com umum módulo de infraestrutura de manobra em 138 kV.*Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | JOAO CAMARA III | MG 500 kV JOAO CAMARA III MG1 RN | RB | FT MG 500 kV JOAO CAMARA III MG1 RN | 008/2011 | IPCA | RBNI | REA 4443/2013 | 3/14/2016 | 3/13/2047 | R$301,649.71 | 6/1/2025 | Ativa | T2013-077 | Complementação do módulo geral da subestação João Câmara III com um módulo de infraestrutura de manobra em 500 kV.*Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | JOAO CAMARA III | MG 500 kV JOAO CAMARA III MG1 RN | RB | FT MG 500 kV JOAO CAMARA III MG1 RN | 008/2011 | IPCA | RBNI | REA 4443/2013 | 3/14/2016 | 3/13/2031 | R$38,570.29 | 6/1/2025 | Ativa | T2013-078 | Complementação do módulo geral da subestação João Câmara III com umum módulo de infraestrutura de manobra em 138 kV.*Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | JOAO CAMARA III | MG 500 kV JOAO CAMARA III MG1 RN | RB | FT MG 500 kV JOAO CAMARA III MG1 RN | 008/2011 | IPCA | RBNI | REA 4443/2013 | 3/14/2016 | 3/13/2047 | R$301,649.71 | 6/1/2025 | Ativa | T2013-078 | Complementação do módulo geral da subestação João Câmara III com um módulo de infraestrutura de manobra em 500 kV.*Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | JOAO CAMARA III | MG 500 kV JOAO CAMARA III MG1 RN | RB | FT MG 500 kV JOAO CAMARA III MG1 RN | 008/2011 | IPCA | RBNI | REA 4443/2013 | 5/14/2016 | 5/13/2031 | R$38,266.16 | 6/1/2025 | Ativa | T2015-055 | Complementação do módulo geral da subestação João Câmara III com umum módulo de infraestrutura de manobra em 138 kV.*Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | JOAO CAMARA III | MC 500 kV TR 500/138 kV JOAO CAMARA III TR2 RN | ICG | 008/2011 | IPCA | RICG | CC 008/2011 | 10/13/2014 | 10/12/2032 | R$764,763.65 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | JOAO CAMARA III | MC 500 kV TR 500/138 kV JOAO CAMARA III TR1 RN | ICG | 008/2011 | IPCA | RICG | CC 008/2011 | 10/13/2014 | 10/12/2032 | R$764,763.65 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | JOAO CAMARA III | MC 500 kV TR 500/138 kV JOAO CAMARA III ATR4 RN | ICG | 008/2011 | IPCA | RICGNI | REA 4443/2013 | 3/14/2016 | 10/12/2032 | R$ 1,582,628.30 | 6/1/2025 | Ativa | T2013-078 | Instalação, na subestação João Câmara III de um módulo de conexão de transformador em 500 kV, arranjo disjuntor e meio*Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Nordeste | JOAO CAMARA III | MC 500 kV TR 500/138 kV JOAO CAMARA III ATR3 RN | ICG | 008/2011 | IPCA | RICGNI | REA 4443/2013 | 3/14/2016 | 10/12/2032 | R$ 1,582,628.30 | 6/1/2025 | Ativa | T2013-077 | Instalação, na subestação João Câmara III de um módulo de conexão de transformador em 500 kV, arranjo disjuntor e meio*Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Nordeste | JOAO CAMARA III | MC 500 kV RTB 500 kV 150 Mvar JOAO CAMARA III RTB1 RN | RB | FT RTB 500 kV 150 Mvar JOAO CAMARA III RTB1 RN | 008/2011 | IPCA | RBNI | REA 4443/2013 | 3/14/2016 | 3/13/2044 | R$ 1,285,682.24 | 6/1/2025 | Ativa | T2013-085 | Instalação, na SE João Câmara III, de um módulo de conexão de reator barras 500 kV, arranjo disjuntor e meio.*Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | JOAO CAMARA III | MC 138 kV TR 500/138 kV JOAO CAMARA III TR2 RN | ICG | 008/2011 | IPCA | RICG | CC 008/2011 | 10/13/2014 | 10/12/2032 | R$212,553.92 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | JOAO CAMARA III | MC 138 kV TR 500/138 kV JOAO CAMARA III TR1 RN | ICG | 008/2011 | IPCA | RICG | CC 008/2011 | 10/13/2014 | 10/12/2032 | R$212,553.92 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | JOAO CAMARA III | MC 138 kV TR 500/138 kV JOAO CAMARA III ATR4 RN | ICG | 008/2011 | IPCA | RICGNI | REA 4443/2013 | 3/14/2016 | 10/12/2032 | R$460,759.60 | 6/1/2025 | Ativa | T2013-078 | Instalação, na subestação João Câmara III de um módulo de conexão de transformador em 138 kV, arranjo barra dupla a quatro chaves*Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Nordeste | JOAO CAMARA III | MC 138 kV TR 500/138 kV JOAO CAMARA III ATR3 RN | ICG | 008/2011 | IPCA | RICGNI | REA 4443/2013 | 3/14/2016 | 10/12/2032 | R$460,759.60 | 6/1/2025 | Ativa | T2013-077 | Instalação, na subestação João Câmara III de um módulo de conexão de transformador em 138 kV, arranjo barra dupla a quatro chaves*Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Nordeste | JOAO CAMARA III | MC 138 kV BC 138 kV 50 Mvar JOAO CAMARA III BC1 RN | ICG | 008/2011 | IPCA | RICG | CC 008/2011 | 10/13/2014 | 10/12/2032 | R$218,873.49 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | JOAO CAMARA III | IB 500 kV MG 500 kV JOAO CAMARA III MG1 RN IB4 | RB | FT MG 500 kV JOAO CAMARA III MG1 RN | 008/2011 | IPCA | RBNI | REA 4443/2013 | 3/14/2016 | 3/13/2047 | R$ 1,418,545.18 | 6/1/2025 | Ativa | T2013-078 | Instalação, na SE João Câmara III, de um módulo de interligação de barras 500 kV, arranjo disjuntor e meio.*Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | JOAO CAMARA III | IB 500 kV MG 500 kV JOAO CAMARA III MG1 RN IB3 | RB | FT MG 500 kV JOAO CAMARA III MG1 RN | 008/2011 | IPCA | RBNI | REA 4443/2013 | 3/14/2016 | 3/13/2047 | R$ 1,418,545.18 | 6/1/2025 | Ativa | T2013-077 | Instalação, na SE João Câmara III, de um módulo de interligação de barras 500 kV, arranjo disjuntor e meio.*Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | JOAO CAMARA III | IB 500 kV MG 500 kV JOAO CAMARA III MG1 RN IB2 | RB | FT MG 500 kV JOAO CAMARA III MG1 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$670,964.90 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | JOAO CAMARA III | IB 500 kV MG 500 kV JOAO CAMARA III MG1 RN IB1 | RB | FT MG 500 kV JOAO CAMARA III MG1 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$670,964.90 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | JOAO CAMARA III | IB 138 kV MG 500 kV JOAO CAMARA III MG1 RN IB2 | ICG | 008/2011 | IPCA | RICGNI | REA 4443/2013 | 5/14/2016 | 10/12/2032 | R$249,269.15 | 6/1/2025 | Ativa | T2015-055 | Instalação, na subestação João Câmara III, de um módulo de interligação de barras 138 kV, arranjo barra dupla a quatro chaves,na semi-barra em que serão conectados o 3º e 4º bancos de transformadores 500/138 kV.*Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Nordeste | JOAO CAMARA III | IB 138 kV MG 500 kV JOAO CAMARA III MG1 RN IB1 | ICG | 008/2011 | IPCA | RICG | CC 008/2011 | 10/13/2014 | 10/12/2032 | R$159,457.33 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | JOAO CAMARA III | EL 500 kV JOAO CAMARA III LT 500 kV JOAO CAMARA III /CEARA MIRIM II C-1 RN | RB | FT LT 500 kV JOAO CAMARA III /CEARA MIRIM II C-1 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$703,441.68 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | JOAO CAMARA III | BC 138 kV 50 Mvar JOAO CAMARA III BC1 RN | ICG | 008/2011 | IPCA | RICG | CC 008/2011 | 10/13/2014 | 10/12/2032 | R$328,403.02 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | JOAO PESSOA II | MG 230 kV JOAO PESSOA II MG2 PB | RB | FT MG 230 kV JOAO PESSOA II MG2 PB | 061/2001 | IPCA | RBNI | DSP 420/2023 | 9/26/2022 | 12/31/2042 | R$10,582.64 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 230 kV na SE João Pessoa II, associado a entrada de linha 230 kV para a SE Goianinha, em função do seccionamento da LT 230 kV Goianinha - Mussuré II C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JOAO PESSOA II | MG 230 kV JOAO PESSOA II MG2 PB | RB | FT MG 230 kV JOAO PESSOA II MG2 PB | 061/2001 | IPCA | RBNI | DSP 420/2023 | 9/26/2022 | 12/31/2042 | R$10,582.64 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 230 kV na SE João Pessoa II, associado a entrada de linha 230 kV para a SE Mussuré II, em função do seccionamento da LT 230 kV Goianinha - Mussuré II C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JOAO PESSOA II | MG 230 kV JOAO PESSOA II MG2 PB | RB | FT MG 230 kV JOAO PESSOA II MG2 PB | 061/2001 | IPCA | RBNI | DSP 420/2023 | 9/26/2022 | 12/31/2042 | R$10,582.64 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 230 kV na SE João Pessoa II, associado a entrada de linha 230 kV para a SE Goianinha, em função do seccionamento da LT 230 kV Goianinha - Santa Rita II C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JOAO PESSOA II | MG 230 kV JOAO PESSOA II MG2 PB | RB | FT MG 230 kV JOAO PESSOA II MG2 PB | 061/2001 | IPCA | RBNI | DSP 420/2023 | 9/26/2022 | 12/31/2042 | R$10,582.64 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 230 kV na SE João Pessoa II, associado a entrada de linha 230 kV para a SE Santa Rita II, em função do seccionamento da LT 230 kV Goianinha - Santa Rita II C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JOAO PESSOA II | MG 230 kV JOAO PESSOA II MG2 PB | RB | FT MG 230 kV JOAO PESSOA II MG2 PB | 061/2001 | IPCA | RBNI | DSP 420/2023 | 9/26/2022 | 12/31/2042 | R$10,582.64 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 230 kV na SE João Pessoa II, associado a entrada de linha 230 kV para a SE Mussuré II, em função do seccionamento da LT 230 kV Mussuré II - Santa Rita II C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JOAO PESSOA II | MG 230 kV JOAO PESSOA II MG2 PB | RB | FT MG 230 kV JOAO PESSOA II MG2 PB | 061/2001 | IPCA | RBNI | DSP 420/2023 | 9/26/2022 | 12/31/2042 | R$10,582.64 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 230 kV na SE João Pessoa II, associado a entrada de linha 230 kV para a SE Santa Rita II, em função do seccionamento da LT 230 kV Mussuré II - Santa Rita II C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JOAO PESSOA II | EL 230 kV JOAO PESSOA II LT 230 kV JOAO PESSOA II /SANTA RITA II C-2 PB | RB | FT LT 230 kV JOAO PESSOA II /SANTA RITA II C-2 PB | 061/2001 | IPCA | RBNI | DSP 420/2023 | 9/26/2022 | 12/31/2042 | R$108,282.00 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo Barra Dupla a Quatro Chaves, na subestação João Pessoa II, associada à Linha de Transmissão 230 kV João Pessoa II – Santa Rita II CF4. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JOAO PESSOA II | EL 230 kV JOAO PESSOA II LT 230 kV JOAO PESSOA II /SANTA RITA II C-1 PB | RB | FT LT 230 kV JOAO PESSOA II /SANTA RITA II C-1 PB | 061/2001 | IPCA | RBNI | DSP 420/2023 | 9/26/2022 | 12/31/2042 | R$108,282.00 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo Barra Dupla a Quatro Chaves, na subestação João Pessoa II, associada à Linha de Transmissão 230 kV João Pessoa II – Santa Rita II CJ1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JOAO PESSOA II | EL 230 kV JOAO PESSOA II LT 230 kV JOAO PESSOA II /MUSSURE II C-2 PB | RB | FT LT 230 kV JOAO PESSOA II /MUSSURE II C-2 PB | 061/2001 | IPCA | RBNI | DSP 420/2023 | 9/26/2022 | 12/31/2042 | R$108,282.00 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo Barra Dupla a Quatro Chaves, na subestação João Pessoa II, associada à Linha de Transmissão 230 kV João Pessoa II – Mussuré II CF2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JOAO PESSOA II | EL 230 kV JOAO PESSOA II LT 230 kV JOAO PESSOA II /MUSSURE II C-1 PB | RB | FT LT 230 kV JOAO PESSOA II /MUSSURE II C-1 PB | 061/2001 | IPCA | RBNI | DSP 420/2023 | 9/26/2022 | 12/31/2042 | R$108,282.00 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo Barra Dupla a Quatro Chaves, na subestação João Pessoa II, associada à Linha de Transmissão 230 kV Mussuré II – João Pessoa II CF1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JOAO PESSOA II | EL 230 kV JOAO PESSOA II LT 230 kV GOIANINHA /JOAO PESSOA II C-2 PE/PB | RB | FT LT 230 kV GOIANINHA /JOAO PESSOA II C-2 PE/PB | 061/2001 | IPCA | RBNI | DSP 420/2023 | 9/26/2022 | 12/31/2042 | R$108,282.00 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo Barra Dupla a Quatro Chaves, na subestação João Pessoa II, associada à Linha de Transmissão 230 kV Goianinha – João Pessoa II CN3. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JOAO PESSOA II | EL 230 kV JOAO PESSOA II LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB | RB | FT LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB | 061/2001 | IPCA | RBNI | DSP 420/2023 | 9/26/2022 | 12/31/2042 | R$108,282.00 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo Barra Dupla a Quatro Chaves, na subestação João Pessoa II, associada à Linha de Transmissão 230 kV Goianinha – João Pessoa II CN2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | JOINV.NORTE | TR 230/138 kV JOINV.NORTE TR4 SC | RBF | FT TR 230/138 kV JOINV.NORTE TR4 SC | 057/2001 | IPCA | RBNI | REA 4802/2014 | 8/17/2016 | 3/28/2051 | R$ 1,624,316.85 | 6/1/2025 | Ativa | T2014-051 | Instalação, na SE Joinville Norte, do quarto autotransformador trifásico 230/138 kV, de 150 MVA. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINV.NORTE | TR 230/138 kV JOINV.NORTE TR3 SC | RBF | FT TR 230/138 kV JOINV.NORTE TR3 SC | 057/2001 | IPCA | RBNI | REA 3161/2011 | 10/26/2013 | 6/5/2048 | R$ 1,515,024.42 | 6/1/2025 | Ativa | T2011-132 | Instalação do 3º autotransformador trifásico 230/138 kV, 150 MVA *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINV.NORTE | TR 230/138 kV JOINV.NORTE TR2 SC | RBF | FT TR 230/138 kV JOINV.NORTE TR2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$377,367.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINV.NORTE | TR 230/138 kV JOINV.NORTE TR1 SC | RBF | FT TR 230/138 kV JOINV.NORTE TR1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$377,367.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINV.NORTE | MG 230 kV JOINV.NORTE MG1 SC | RB | FT MG 230 kV JOINV.NORTE MG1 SC | 057/2001 | IPCA | RBNI | REA 3161/2011 | 10/26/2013 | 9/29/2042 | R$172,951.32 | 6/1/2025 | Ativa | T2011-132 | Complemento ao módulo geral referente ao módulo de infraestrutura de manobra associado à conexão de transformador em 230 kV. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINV.NORTE | MG 230 kV JOINV.NORTE MG1 SC | RB | FT MG 230 kV JOINV.NORTE MG1 SC | 057/2001 | IPCA | RBNI | REA 3161/2011 | 10/26/2013 | 6/22/2042 | R$109,567.79 | 6/1/2025 | Ativa | T2011-132 | Complemento ao módulo geral referente ao módulo de infraestrutura de manobra associado à conexão de transformador em 138 kV. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINV.NORTE | MG 230 kV JOINV.NORTE MG1 SC | RB | FT MG 230 kV JOINV.NORTE MG1 SC | 057/2001 | IPCA | RBNI | REA 3915/2013 | 2/27/2015 | 1/31/2044 | R$179,644.23 | 6/1/2025 | Ativa | T2013-015 | Complemento ao módulo de infraestrutura geral por meio da instalação de um módulo de infraestrutura de manobra associado ao módulo de conexão do primeiro banco de capacitores, 230 kV, 100 Mvar na subestação Joinville Norte. * (Receita alterada devido à alteração do perfil de plano para decrescente). *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINV.NORTE | MG 230 kV JOINV.NORTE MG1 SC | RB | FT MG 230 kV JOINV.NORTE MG1 SC | 057/2001 | IPCA | RBNI | REA 3915/2013 | 4/22/2015 | 3/25/2044 | R$180,382.73 | 6/1/2025 | Ativa | T2013-015 | Complemento ao módulo de infraestrutura geral por meio da instalação de um módulo de infraestrutura de manobra associado ao módulo de conexão do segundo banco de capacitores, 230 kV, 100 Mvar na subestação Joinville Norte. * (Receita alterada devido à alteração do perfil de plano para decrescente). *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINV.NORTE | MG 230 kV JOINV.NORTE MG1 SC | RB | FT MG 230 kV JOINV.NORTE MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$476,869.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINV.NORTE | MG 230 kV JOINV.NORTE MG1 SC | RB | FT MG 230 kV JOINV.NORTE MG1 SC | 057/2001 | IPCA | RBNI | REA 4802/2014 | 8/17/2016 | 7/21/2045 | R$186,990.82 | 6/1/2025 | Ativa | T2014-051 | Complementação, na SE Joinville Norte, da infraestrutura do Módulo Geral, referente à instalação de um módulo de conexão em 230 kV, arranjo barra dupla a quatro chaves, para o quarto autotransformador 230/138 kV a ser instalado. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINV.NORTE | MG 230 kV JOINV.NORTE MG1 SC | RB | FT MG 230 kV JOINV.NORTE MG1 SC | 057/2001 | IPCA | RBNI | REA 4802/2014 | 8/17/2016 | 4/13/2045 | R$118,551.52 | 6/1/2025 | Ativa | T2014-051 | Complementação, na SE Joinville Norte, da infraestrutura do Módulo Geral, referente à instalação de um módulo de conexão em 138 kV, arranjo barra dupla a quatro chaves, para o quarto autotransformador 230/138 kV a ser instalado. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINV.NORTE | MG 230 kV JOINV.NORTE MG1 SC | RB | FT MG 230 kV JOINV.NORTE MG1 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 10/15/2022 | 5/25/2038 | R$55,783.60 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | JOINV.NORTE | MG 230 kV JOINV.NORTE MG1 SC | RB | FT MG 230 kV JOINV.NORTE MG1 SC | 057/2001 | IPCA | RBNI | REA 8314/2019 | 8/31/2022 | 8/30/2037 | R$38,458.62 | 6/1/2025 | Ativa | Substituição do sistema de registro de perturbações (RDP) para monitoração das tensões das barras de 230 kV.. Equipamento de tecnologia obsoleta. Final de vida útil. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | JOINV.NORTE | MC 230 kV TR 230/138 kV JOINV.NORTE TR4 SC | RBF | FT TR 230/138 kV JOINV.NORTE TR4 SC | 057/2001 | IPCA | RBNI | REA 4802/2014 | 8/17/2016 | 6/1/2047 | R$ 1,018,051.87 | 6/1/2025 | Ativa | T2014-051 | Instalação, na SE Joinville Norte, de um módulo de conexão 230 kV, arranjo barra dupla a quatro chaves, para o quarto autotransformador trifásico 230/138 kV, de 150 MVA a ser instalado. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINV.NORTE | MC 230 kV TR 230/138 kV JOINV.NORTE TR3 SC | RBF | FT TR 230/138 kV JOINV.NORTE TR3 SC | 057/2001 | IPCA | RBNI | REA 3161/2011 | 10/26/2013 | 8/11/2044 | R$920,253.27 | 6/1/2025 | Ativa | T2011-132 | Conexão de transformador em 230 kV, arranjo barra dupla a quatro chaves; *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINV.NORTE | MC 230 kV TR 230/138 kV JOINV.NORTE TR2 SC | RBF | FT TR 230/138 kV JOINV.NORTE TR2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINV.NORTE | MC 230 kV TR 230/138 kV JOINV.NORTE TR1 SC | RBF | FT TR 230/138 kV JOINV.NORTE TR1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINV.NORTE | MC 230 kV BC 230 kV 100 Mvar JOINV.NORTE BC2 SC | RB | FT BC 230 kV 100 Mvar JOINV.NORTE BC2 SC | 057/2001 | IPCA | RBNI | REA 3915/2013 | 4/22/2015 | 3/7/2046 | R$980,294.65 | 6/1/2025 | Ativa | T2013-015 | Instalação de um módulo de conexão em 230 kV, arranjo barra dupa a quatro chaves, associado ao segundo banco de capacitores, 230 kV, 100 Mvar, na subestação Joinville Norte. * (Receita alterada devido à alteração do perfil de plano para decrescente). *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINV.NORTE | MC 230 kV BC 230 kV 100 Mvar JOINV.NORTE BC1 SC | RB | FT BC 230 kV 100 Mvar JOINV.NORTE BC1 SC | 057/2001 | IPCA | RBNI | REA 3915/2013 | 2/27/2015 | 12/27/2045 | R$926,016.41 | 6/1/2025 | Ativa | T2013-015 | Instalação de um módulo de conexão em 230 kV, arranjo barra dupa a quatro chaves, associado ao primeiro banco de capacitores, 230 kV, 100 Mvar, na subestação Joinville Norte. * (Receita alterada devido à alteração do perfil de plano para decrescente). *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINV.NORTE | MC 138 kV TR 230/138 kV JOINV.NORTE TR4 SC | RBF | FT TR 230/138 kV JOINV.NORTE TR4 SC | 057/2001 | IPCA | RBNI | REA 4802/2014 | 8/17/2016 | 5/3/2047 | R$809,834.00 | 6/1/2025 | Ativa | T2014-051 | Instalação, na SE Joinville Norte, de um módulo de conexão 138 kV, arranjo barra dupla a quatro chaves, para o quarto autotransformador trifásico 230/138 kV, de 150 MVA a ser instalado. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINV.NORTE | MC 138 kV TR 230/138 kV JOINV.NORTE TR3 SC | RBF | FT TR 230/138 kV JOINV.NORTE TR3 SC | 057/2001 | IPCA | RBNI | REA 3161/2011 | 10/26/2013 | 7/12/2044 | R$731,571.94 | 6/1/2025 | Ativa | T2011-132 | Conexão de transformador em 138 kV, arranjo barra dupla a quatro chaves. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINV.NORTE | MC 138 kV TR 230/138 kV JOINV.NORTE TR2 SC | RBF | FT TR 230/138 kV JOINV.NORTE TR2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$100,865.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINV.NORTE | MC 138 kV TR 230/138 kV JOINV.NORTE TR1 SC | RBF | FT TR 230/138 kV JOINV.NORTE TR1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$100,865.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINV.NORTE | IB 230 kV MG 230 kV JOINV.NORTE MG1 SC IB1 | RB | FT MG 230 kV JOINV.NORTE MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,146.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINV.NORTE | IB 138 kV MG 230 kV JOINV.NORTE MG1 SC IB1 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,027.82 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINV.NORTE | EL 230 kV JOINV.NORTE LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC | RB | FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINV.NORTE | EL 230 kV JOINV.NORTE LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC | RB | FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINV.NORTE | EL 230 kV JOINV.NORTE LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC | RB | FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINV.NORTE | EL 138 kV JOINV.NORTE DIST4 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$149,126.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINV.NORTE | EL 138 kV JOINV.NORTE DIST3 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$149,126.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINV.NORTE | EL 138 kV JOINV.NORTE DIST2 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$149,126.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINV.NORTE | EL 138 kV JOINV.NORTE DIST1 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$149,126.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINV.NORTE | BC 230 kV 100 Mvar JOINV.NORTE BC2 SC | RB | FT BC 230 kV 100 Mvar JOINV.NORTE BC2 SC | 057/2001 | IPCA | RBNI | REA 3915/2013 | 4/22/2015 | 2/22/2038 | R$372,929.02 | 6/1/2025 | Ativa | T2013-015 | Instalação do segundo banco de capacitores, 230 kV, 100 Mvar na subestação Joinville Norte. * (Receita alterada devido à alteração do perfil de plano para decrescente). *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINV.NORTE | BC 230 kV 100 Mvar JOINV.NORTE BC1 SC | RB | FT BC 230 kV 100 Mvar JOINV.NORTE BC1 SC | 057/2001 | IPCA | RBNI | REA 3915/2013 | 2/27/2015 | 12/30/2037 | R$370,842.25 | 6/1/2025 | Ativa | T2013-015 | Instalação do primeiro banco de capacitores, 230 kV, 100 Mvar na subestação Joinville Norte. * (Receita alterada devido à alteração do perfil de plano para decrescente). *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINVILLE | TR 230/69 kV JOINVILLE TR8 SC | RBF | FT TR 230/69 kV JOINVILLE TR8 SC | 057/2001 | IPCA | RBNI | REA 7576/2019 | 9/17/2021 | 12/24/2055 | R$ 2,897,905.86 | 6/1/2025 | Ativa | T2018-097 | Obra de Substituição Completa - Substituição, na SE Joinville, do Transformador Trifásico (TF8) 230/69kV - 100 MVA por um de 150 MVA. A receita anterior deve ser cancelada após a entrada em operação comercial do novo equipamento. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINVILLE | TR 230/138 kV JOINVILLE TRR2 SC | RBF | FT TR 230/138 kV JOINVILLE TRR2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$280,729.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | TR 230/138 kV JOINVILLE TRR2 SC | RBF | FT TR 230/138 kV JOINVILLE TRR2 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$492,702.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | TR 230/138 kV JOINVILLE TRR1 SC | RBF | FT TR 230/138 kV JOINVILLE TRR1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$280,729.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | TR 230/138 kV JOINVILLE TRR1 SC | RBF | FT TR 230/138 kV JOINVILLE TRR1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$492,702.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | TR 230/138 kV JOINVILLE TR7 SC | RBF | FT TR 230/138 kV JOINVILLE TR7 SC | 057/2001 | IPCA | RBNI | REA 7576/2019 | 7/24/2021 | 11/3/2055 | R$ 2,955,872.12 | 6/1/2025 | Ativa | T2018-097 | Obra de Substituição Completa - Substituição, na SE Joinville, do Autotransformador Trifásico (TF7) 230/138 kV - 75 MVA por um de 150 MVA. A receita anterior deve ser cancelada após a entrada em operação comercial do novo equipamento. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINVILLE | TR 230/138 kV JOINVILLE TR6 SC | RBF | FT TR 230/138 kV JOINVILLE TR6 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$377,367.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | TR 230/138 kV JOINVILLE TR4 SC | RBF | FT TR 230/138 kV JOINVILLE TR4 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$377,367.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | TR 230/138 kV JOINVILLE TR4 SC | RBF | FT TR 230/138 kV JOINVILLE TR4 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$662,310.72 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | TR 230/138 kV JOINVILLE TR4 SC | RBF | FT TR 230/138 kV JOINVILLE TR4 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$560,988.73 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | TR 230/138 kV JOINVILLE TR3 SC | RBF | FT TR 230/138 kV JOINVILLE TR3 SC | 057/2001 | IPCA | RBNI | REA 7576/2019 | 11/21/2021 | 3/2/2056 | R$ 2,976,858.06 | 6/1/2025 | Ativa | T2018-097 | Obra de Substituição Completa - Substituição, na SE Joinville, do Autotransformador Trifásico (TF3) 230/138 kV - 100 MVA por um de 150 MVA. A receita anterior deve ser cancelada após a entrada em operação comercial do novo equipamento. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINVILLE | TR 138/69 kV JOINVILLE TRR1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$139,652.69 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | TR 138/69 kV JOINVILLE TRR1 SC | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$245,101.94 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | TR 138/69 kV JOINVILLE TRR1 SC | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$207,605.62 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | TR 138/69 kV JOINVILLE TR5 SC | DIT | 057/2001 | IPCA | RCDM | REA 7576/2019 | 6/15/2021 | 4/9/2055 | R$ 1,720,940.41 | 6/1/2025 | Ativa | T2018-097 | Obra de Substituição Completa - Substituição, na SE Joinville, do Autotransformador Trifásico (TF5) 138/69 kV - 33 MVA por um de 66 MVA. A receita anterior deve ser cancelada após a entrada em operação comercial do novo equipamento. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | JOINVILLE | TR 138/69 kV JOINVILLE TR2 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$139,652.69 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | TR 138/69 kV JOINVILLE TR2 SC | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$245,101.94 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | TR 138/69 kV JOINVILLE TR2 SC | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 3/25/2021 | 3/28/2051 | R$49,547.47 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | JOINVILLE | TR 138/69 kV JOINVILLE TR1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$179,210.39 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | TR 138/69 kV JOINVILLE TR1 SC | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$314,528.94 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | TR 138/69 kV JOINVILLE TR1 SC | DIT | 057/2001 | IPCA | RCDMA | DSP 3095/2023 | R$ 1,595,762.70 | 6/1/2025 | Prevista | T2023-142 | Obra de Substituição Completa - Substituição do transformador trifásico 138/69 kV, 50 MVA – TF1, por transformador trifásico de 66 MVA, devido final de vida útil técnica. (Rotina-Substituição - o IdeMdl 11510 será substituído pelo novo equipamento). | |||||
| AXIA Energia Sul | JOINVILLE | MG 230 kV JOINVILLE MG1 SC | RB | FT MG 230 kV JOINVILLE MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$679,424.97 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | MG 230 kV JOINVILLE MG1 SC | RB | FT MG 230 kV JOINVILLE MG1 SC | 057/2001 | IPCA | RMEL | REN 643/2014 | 3/8/2013 | 3/7/2030 | R$17,006.39 | 6/1/2025 | Ativa | Substituição de 2 baterias 110 Vcc.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | JOINVILLE | MG 230 kV JOINVILLE MG1 SC | RB | FT MG 230 kV JOINVILLE MG1 SC | 057/2001 | IPCA | RBNI | REA 7576/2019 | 1/28/2022 | 2/24/2051 | R$103,696.52 | 6/1/2025 | Ativa | T2018-097 | Complementação do módulo geral da Subestação Joinville para a substituição dos transformadores TF3, TF5, TF7 e TF8 *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINVILLE | MG 230 kV JOINVILLE MG1 SC | RB | FT MG 230 kV JOINVILLE MG1 SC | 057/2001 | IPCA | RBNI | REA 7576/2019 | 1/28/2022 | 1/27/2037 | R$76,916.24 | 6/1/2025 | Ativa | T2018-097 | Recapacitação dos barramentos 230 kV, 138 kV e 69 kV da Subestação Joinville *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINVILLE | MG 230 kV JOINVILLE MG1 SC | RB | FT MG 230 kV JOINVILLE MG1 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 6/6/2022 | 5/3/2043 | R$239,786.54 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | JOINVILLE | MC 69 kV TR 230/69 kV JOINVILLE TR8 SC | RBF | FT TR 230/69 kV JOINVILLE TR8 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$48,587.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | MC 69 kV TR 230/69 kV JOINVILLE TR8 SC | RBF | FT TR 230/69 kV JOINVILLE TR8 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$85,275.75 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | MC 69 kV TR 230/69 kV JOINVILLE TR8 SC | RBF | FT TR 230/69 kV JOINVILLE TR8 SC | 057/2001 | IPCA | RBNI | REA 7576/2019 | 9/17/2021 | 6/30/2054 | R$238,336.09 | 6/1/2025 | Ativa | T2018-097 | Adequação, na subestação Joinville, da CT de 69 kV, arranjo BS, do transformador TF8 *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINVILLE | MC 69 kV TR 230/69 kV JOINVILLE TR8 SC | RBF | FT TR 230/69 kV JOINVILLE TR8 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/26/2023 | 1/25/2047 | R$11,100.21 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | JOINVILLE | MC 69 kV TR 138/69 kV JOINVILLE TR5 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$48,587.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | MC 69 kV TR 138/69 kV JOINVILLE TR5 SC | DIT | 057/2001 | IPCA | RCDM | REA 7576/2019 | 6/15/2021 | 4/14/2045 | R$226,187.83 | 6/1/2025 | Ativa | T2018-097 | Adequação, na subestação Joinville, da CT de 69 kV, arranjo BS, do transformador TF5 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | JOINVILLE | MC 69 kV TR 138/69 kV JOINVILLE TR5 SC | DIT | 057/2001 | IPCA | RCDM | REA 5484/2015 | 4/19/2018 | 4/21/2048 | R$34,196.86 | 6/1/2025 | Ativa | Substituição de 3 transformador(es) de corrente do(s) vão(s): TF5 138/69 kV (TC342). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | JOINVILLE | MC 69 kV TR 138/69 kV JOINVILLE TR2 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$48,587.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | MC 69 kV TR 138/69 kV JOINVILLE TR2 SC | DIT | 057/2001 | IPCA | RCDM | REA 5484/2015 | 4/19/2018 | 4/21/2048 | R$34,196.86 | 6/1/2025 | Ativa | Substituição de 3 transformador(es) de corrente do(s) vão(s): TF2 138/69 kV (TC332) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | JOINVILLE | MC 69 kV TR 138/69 kV JOINVILLE TR2 SC | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 3/31/2022 | 3/30/2055 | R$77,091.38 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | JOINVILLE | MC 69 kV TR 138/69 kV JOINVILLE TR1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$48,587.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | MC 69 kV TR 138/69 kV JOINVILLE TR1 SC | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 7/31/2022 | 8/2/2052 | R$56,438.68 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | JOINVILLE | MC 230 kV TR 230/69 kV JOINVILLE TR8 SC | RBF | FT TR 230/69 kV JOINVILLE TR8 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$126,634.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | MC 230 kV TR 230/69 kV JOINVILLE TR8 SC | RBF | FT TR 230/69 kV JOINVILLE TR8 SC | 057/2001 | IPCA | RMEL | REN 643/2014 | 10/6/2013 | 10/5/2037 | R$17,328.73 | 6/1/2025 | Ativa | Substituição dos para-raios de SiC do TF 8.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | JOINVILLE | MC 230 kV TR 230/69 kV JOINVILLE TR8 SC | RBF | FT TR 230/69 kV JOINVILLE TR8 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$222,253.60 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | MC 230 kV TR 230/69 kV JOINVILLE TR8 SC | RBF | FT TR 230/69 kV JOINVILLE TR8 SC | 057/2001 | IPCA | RBNI | REA 7576/2019 | 9/17/2021 | 6/12/2044 | R$482,083.31 | 6/1/2025 | Ativa | T2018-097 | Adequação, na subestação Joinville, da CT de 230 kV, arranjo BPT, do transformador TF8 *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINVILLE | MC 230 kV TR 230/69 kV JOINVILLE TR8 SC | RBF | FT TR 230/69 kV JOINVILLE TR8 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/26/2023 | 1/28/2053 | R$18,538.91 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | JOINVILLE | MC 230 kV TR 230/138 kV JOINVILLE TR7 SC | RBF | FT TR 230/138 kV JOINVILLE TR7 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$126,634.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | MC 230 kV TR 230/138 kV JOINVILLE TR7 SC | RBF | FT TR 230/138 kV JOINVILLE TR7 SC | 057/2001 | IPCA | RBNI | REA 7576/2019 | 7/24/2021 | 12/13/2037 | R$319,881.10 | 6/1/2025 | Ativa | T2018-097 | Adequação, na subestação Joinville, da CT de 230 kV, arranjo BPT, do transformador TF7 *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINVILLE | MC 230 kV TR 230/138 kV JOINVILLE TR7 SC | RBF | FT TR 230/138 kV JOINVILLE TR7 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 10/31/2021 | 10/30/2045 | R$14,449.82 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | JOINVILLE | MC 230 kV TR 230/138 kV JOINVILLE TR6 SC | RBF | FT TR 230/138 kV JOINVILLE TR6 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$126,634.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | MC 230 kV TR 230/138 kV JOINVILLE TR6 SC | RBF | FT TR 230/138 kV JOINVILLE TR6 SC | 057/2001 | IPCA | RBNI | REA 7576/2019 | 12/1/2021 | 7/1/2037 | R$57,632.72 | 6/1/2025 | Ativa | T2018-097 | Adequação, na subestação Joinville, da CT de 230 kV, arranjo BPT, do transformador TF6. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINVILLE | MC 230 kV TR 230/138 kV JOINVILLE TR6 SC | RBF | FT TR 230/138 kV JOINVILLE TR6 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 12/20/2021 | 12/19/2054 | R$108,948.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | JOINVILLE | MC 230 kV TR 230/138 kV JOINVILLE TR4 SC | RBF | FT TR 230/138 kV JOINVILLE TR4 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$126,634.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | MC 230 kV TR 230/138 kV JOINVILLE TR4 SC | RBF | FT TR 230/138 kV JOINVILLE TR4 SC | 057/2001 | IPCA | RBNI | REA 7576/2019 | 12/2/2021 | 12/19/2037 | R$33,262.73 | 6/1/2025 | Ativa | T2018-097 | Adequação, na subestação Joinville, da CT de 230 kV, arranjo BPT, do transformador TF4 *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINVILLE | MC 230 kV TR 230/138 kV JOINVILLE TR4 SC | RBF | FT TR 230/138 kV JOINVILLE TR4 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 3/31/2022 | 3/30/2055 | R$109,718.50 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | JOINVILLE | MC 230 kV TR 230/138 kV JOINVILLE TR3 SC | RBF | FT TR 230/138 kV JOINVILLE TR3 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$126,634.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | MC 230 kV TR 230/138 kV JOINVILLE TR3 SC | RBF | FT TR 230/138 kV JOINVILLE TR3 SC | 057/2001 | IPCA | RBNI | REA 7576/2019 | 11/21/2021 | 11/20/2050 | R$415,747.90 | 6/1/2025 | Ativa | T2018-097 | Adequação, na subestação Joinville, da CT de 230 kV, arranjo BPT, do transformador TF3 *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINVILLE | MC 230 kV TR 230/138 kV JOINVILLE TR3 SC | RBF | FT TR 230/138 kV JOINVILLE TR3 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 3/31/2022 | 4/2/2052 | R$23,743.65 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | JOINVILLE | MC 138 kV TR 230/138 kV JOINVILLE TR7 SC | RBF | FT TR 230/138 kV JOINVILLE TR7 SC | 057/2001 | IPCA | RBNI | REA 2879/2011 | 6/28/2012 | 4/23/2041 | R$219,303.12 | 6/1/2025 | Ativa | T2011-024 | Instalar na SE Joinville, um novo módulo de conexão, em 138 kV, para o transformador TR7 230/138 kV - 75 MVA, composto por chaves seccionadoras, disjuntor, transformadores de corrente e pára-raios remanejados de outras instalações da própria subestação. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINVILLE | MC 138 kV TR 230/138 kV JOINVILLE TR7 SC | RBF | FT TR 230/138 kV JOINVILLE TR7 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$96,926.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | MC 138 kV TR 230/138 kV JOINVILLE TR7 SC | RBF | FT TR 230/138 kV JOINVILLE TR7 SC | 057/2001 | IPCA | RBNI | REA 2837/2011 | 8/19/2012 | 8/22/2042 | R$26,260.56 | 6/1/2025 | Ativa | Substituição de 3 TCs do vão de manobra CT 138 kV associada ao Autotransformador Trifásico TR7 230/138/13,8 kV 75 MVA por superação (Reforço autorizado sem receita prévia regularizado no reajuste do ciclo 2013-2014). *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | JOINVILLE | MC 138 kV TR 230/138 kV JOINVILLE TR7 SC | RBF | FT TR 230/138 kV JOINVILLE TR7 SC | 057/2001 | IPCA | RBNI | REA 7576/2019 | 7/24/2021 | 4/25/2044 | R$193,971.14 | 6/1/2025 | Ativa | T2018-097 | Adequação, na subestação Joinville, da CT de 138 kV, arranjo BD3, do transformador TF7 *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINVILLE | MC 138 kV TR 230/138 kV JOINVILLE TR6 SC | RBF | FT TR 230/138 kV JOINVILLE TR6 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$96,926.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | MC 138 kV TR 230/138 kV JOINVILLE TR6 SC | RBF | FT TR 230/138 kV JOINVILLE TR6 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 4/4/2022 | 6/4/2053 | R$130,934.04 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | JOINVILLE | MC 138 kV TR 230/138 kV JOINVILLE TR4 SC | RBF | FT TR 230/138 kV JOINVILLE TR4 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$96,926.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | MC 138 kV TR 230/138 kV JOINVILLE TR4 SC | RBF | FT TR 230/138 kV JOINVILLE TR4 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$170,113.36 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | MC 138 kV TR 230/138 kV JOINVILLE TR4 SC | RBF | FT TR 230/138 kV JOINVILLE TR4 SC | 057/2001 | IPCA | RBNI | DSP 1233/2022 | 8/18/2022 | 8/17/2062 | R$ 604.69 | 6/1/2025 | Ativa | Substituição do conjunto de barramento do módulo de conexão de 138kV do TR 230/138 kV JOINVILLE TR4 SC. Ativos com a vida útil superada e com a necessidade de adequações a parâmetros técnicos e de Procedimentos de Rede. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | JOINVILLE | MC 138 kV TR 230/138 kV JOINVILLE TR3 SC | RBF | FT TR 230/138 kV JOINVILLE TR3 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$96,926.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | MC 138 kV TR 230/138 kV JOINVILLE TR3 SC | RBF | FT TR 230/138 kV JOINVILLE TR3 SC | 057/2001 | IPCA | RBNI | REA 2837/2011 | 8/19/2012 | 8/22/2042 | R$26,260.56 | 6/1/2025 | Ativa | Substituição de 3 TCs do vão de manobra CT 138 kV associada ao Autotransformador Trifásico TR3 230/138/13,8 kV 100 MVA por superação (Reforço autorizado sem receita prévia regularizado no reajuste do ciclo 2013-2014). *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | JOINVILLE | MC 138 kV TR 230/138 kV JOINVILLE TR3 SC | RBF | FT TR 230/138 kV JOINVILLE TR3 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$170,113.36 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | MC 138 kV TR 230/138 kV JOINVILLE TR3 SC | RBF | FT TR 230/138 kV JOINVILLE TR3 SC | 057/2001 | IPCA | RBNI | REA 7576/2019 | 11/21/2021 | 12/21/2044 | R$145,219.07 | 6/1/2025 | Ativa | T2018-097 | Adequação, na subestação Joinville, da CT de 138 kV, arranjo BD3, do transformador TF3 *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | JOINVILLE | MC 138 kV TR 230/138 kV JOINVILLE TR3 SC | RBF | FT TR 230/138 kV JOINVILLE TR3 SC | 057/2001 | IPCA | RBNI | REA 8314/2019 | 2/28/2022 | 2/27/2055 | R$109,482.20 | 6/1/2025 | Ativa | Substituição do Disjuntor de 138 kV - DJ 512 e cabos de controle e potência associados (692 m). Final de vida útil. Riscos de danos às instalações devido à perda de confiabilidade. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | JOINVILLE | MC 138 kV TR 138/69 kV JOINVILLE TR5 SC | DIT | 057/2001 | IPCA | RCDM | REA 2879/2011 | 8/17/2012 | 6/18/2041 | R$109,898.25 | 6/1/2025 | Ativa | T2011-024 | Complementar, na SE Joinville, o módulo de conexão, em 138 kV, do transformador TR5 138/69 kV - 33 MVA, pela utilização da posição e das chaves seccionadoras existentes no módulo de conexão, em 138 kV, do transformador TR7 230/138 kV - 75 MVA e instalação de um disjuntor e demais equipamentos associados. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | JOINVILLE | MC 138 kV TR 138/69 kV JOINVILLE TR5 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$96,926.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | MC 138 kV TR 138/69 kV JOINVILLE TR5 SC | DIT | 057/2001 | IPCA | RCDM | REA 2837/2011 | 8/19/2012 | 8/22/2042 | R$26,260.56 | 6/1/2025 | Ativa | Substituição de 3 TCs do vão de manobra CT 138 kV associada ao Transformador Trifásico TR5 138/69/13,8 kV 33 MVA por superação (Reforço autorizado sem receita prévia regularizado no reajuste do ciclo 2013-2014). *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | JOINVILLE | MC 138 kV TR 138/69 kV JOINVILLE TR5 SC | DIT | 057/2001 | IPCA | RCDM | REA 7576/2019 | 6/15/2021 | 3/6/2043 | R$249,245.86 | 6/1/2025 | Ativa | T2018-097 | Adequação, na subestação Joinville, da CT de 138 kV, arranjo BD3, do transformador TF5 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | JOINVILLE | MC 138 kV TR 138/69 kV JOINVILLE TR2 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$96,926.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | MC 138 kV TR 138/69 kV JOINVILLE TR2 SC | DIT | 057/2001 | IPCA | RCDM | REA 2837/2011 | 8/19/2012 | 8/22/2042 | R$26,260.56 | 6/1/2025 | Ativa | Substituição de 3 TCs do vão de manobra CT 138 kV associada ao Transformador Trifásico TR2 138/69/13,8 kV 33 MVA por superação (Reforço autorizado sem receita prévia reconhecido no reajuste do ciclo 2013-2014). *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | JOINVILLE | MC 138 kV TR 138/69 kV JOINVILLE TR2 SC | DIT | 057/2001 | IPCA | RCDM | REA 7576/2019 | 12/1/2021 | 11/30/2036 | R$80,185.40 | 6/1/2025 | Ativa | T2018-097 | Adequação, na subestação Joinville, da CT de 138 kV, arranjo BD3, do transformador TF2 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | JOINVILLE | MC 138 kV TR 138/69 kV JOINVILLE TR2 SC | DIT | 057/2001 | IPCA | RCDM | REA 8314/2019 | 12/1/2021 | 11/30/2054 | R$86,319.58 | 6/1/2025 | Ativa | Substituição de 1 Disjuntor do vão TF2 138/69 kV (622). Capacidade do novo equipamento: Capacidade nominal de curto-circuito de no mínimo 40 kA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | JOINVILLE | MC 138 kV TR 138/69 kV JOINVILLE TR1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$96,926.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | MC 138 kV TR 138/69 kV JOINVILLE TR1 SC | DIT | 057/2001 | IPCA | RCDM | REA 2837/2011 | 8/19/2012 | 8/22/2042 | R$26,260.56 | 6/1/2025 | Ativa | Substituição de 3 TCs do vão de manobra CT 138 kV associada ao Transformador Trifásico TR1 138/69/13,8 kV 50 MVA por superação (Reforço autorizado sem receita prévia reconhecido no reajuste do ciclo 2013-2014). *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | JOINVILLE | MC 138 kV TR 138/69 kV JOINVILLE TR1 SC | DIT | 057/2001 | IPCA | RCDM | REA 7576/2019 | 12/1/2021 | 5/3/2037 | R$78,079.44 | 6/1/2025 | Ativa | T2018-097 | Adequação, na subestação Joinville, da CT de 138 kV, arranjo BD3, do transformador TF1 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | JOINVILLE | IB 230 kV MG 230 kV JOINVILLE MG1 SC IB1 | RB | FT MG 230 kV JOINVILLE MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$100,223.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | IB 138 kV MG 230 kV JOINVILLE MG1 SC IB1 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,027.82 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | IB 138 kV MG 230 kV JOINVILLE MG1 SC IB1 | DIT | 057/2001 | IPCA | RCDM | REA 7576/2019 | 1/12/2022 | 1/11/2037 | R$80,647.60 | 6/1/2025 | Ativa | T2018-097 | Adequação, na subestação Joinville, do IB de 138 kV, arranjo BD3. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | JOINVILLE | EL 69 kV JOINVILLE DIST7 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,961.27 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | EL 69 kV JOINVILLE DIST7 | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 2/28/2019 | 2/27/2043 | R$9,145.40 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | JOINVILLE | EL 69 kV JOINVILLE DIST7 | DIT | 057/2001 | IPCA | RCDM | REN 905/2020 | 8/16/2022 | 8/15/2055 | R$71,168.16 | 6/1/2025 | Ativa | Substituição de 1 Disjuntor do vão Joinville I C-2 (DJ352).Capacidade do novo equipamento: Capacidade nominal de curto-circuito (kA): no mínimo 31,5 kA.. Superação por Corrente de Curto-Circuito simétrica Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | JOINVILLE | EL 69 kV JOINVILLE DIST7 | DIT | 057/2001 | IPCA | RCDM | REN 905/2020 | 10/4/2022 | 10/6/2052 | R$38,893.13 | 6/1/2025 | Ativa | Substituição de 3 Transformadores de Corrente do vão Vega do Sul C-1 (VSL 1).Capacidade do novo equipamento: Capacidade nominal de curto-circuito (kA): 40 kA.. Superação por Corrente de Curto-Circuito simétrica Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | JOINVILLE | EL 69 kV JOINVILLE DIST6 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,961.27 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | EL 69 kV JOINVILLE DIST6 | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 2/23/2021 | 2/26/2051 | R$124,856.73 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | JOINVILLE | EL 230 kV JOINVILLE LT 230 kV JOINVILLE /VEGA DO SUL C-2 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | EL 230 kV JOINVILLE LT 230 kV JOINVILLE /VEGA DO SUL C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | EL 230 kV JOINVILLE LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC | RB | FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | EL 230 kV JOINVILLE LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC | RB | FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC | 057/2001 | IPCA | RBNI | REA 7761/2019 | 4/30/2018 | 4/29/2048 | R$20,769.18 | 6/1/2025 | Ativa | Substituição de 3 Para-raiosem Joinville Norte (JNO) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 | |||
| AXIA Energia Sul | JOINVILLE | EL 230 kV JOINVILLE LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC | RB | FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 5/11/2022 | 8/6/2053 | R$253,582.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | JOINVILLE | EL 230 kV JOINVILLE LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC | RB | FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | EL 230 kV JOINVILLE LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC | RB | FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC | 057/2001 | IPCA | RBNI | REA 7761/2019 | 4/30/2018 | 4/29/2042 | R$9,225.20 | 6/1/2025 | Ativa | Substituição de 3 Para-raios em Curitiba (CBA). ZnO 192kV * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | JOINVILLE | EL 230 kV JOINVILLE LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC | RB | FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 5/29/2022 | 5/31/2052 | R$251,389.75 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | JOINVILLE | EL 230 kV JOINVILLE LT 230 kV BLUMENAU /JOINVILLE C-1 SC | RB | FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | JOINVILLE | EL 138 kV JOINVILLE LT 138 kV JOINVILLE GM /JOINVILLE C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$145,187.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | EL 138 kV JOINVILLE LT 138 kV JOINVILLE GM /JOINVILLE C-1 SC | DIT | 057/2001 | IPCA | RCDM | REA 2837/2011 | 8/19/2012 | 8/22/2042 | R$26,260.56 | 6/1/2025 | Ativa | Substituição de 3 TCs do vão de manobra da LT 138 kV Joinville - Ilhota por superação (Reforço autorizado sem receita prévia reconhecido no reajuste do ciclo 2013-2014). *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | JOINVILLE | EL 138 kV JOINVILLE LT 138 kV JOINVILLE /J.S.CATARINA C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$145,187.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | EL 138 kV JOINVILLE LT 138 kV JOINVILLE /J.S.CATARINA C-1 SC | DIT | 057/2001 | IPCA | RCDM | REA 2837/2011 | 8/19/2012 | 8/22/2042 | R$26,260.56 | 6/1/2025 | Ativa | Substituição de 3 TCs do vão de manobra da LT 138 kV Joinville - Joinville Santa Cataria por superação (Reforço autorizado sem receita prévia reconhecido no reajuste do ciclo 2013-2014). *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | JOINVILLE | EL 138 kV JOINVILLE LT 138 kV JOINVILLE /J.S.CATARINA C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$254,815.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | EL 138 kV JOINVILLE DIST5 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$145,187.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | EL 138 kV JOINVILLE DIST5 | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$254,815.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | EL 138 kV JOINVILLE DIST4 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$145,187.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | EL 138 kV JOINVILLE DIST4 | DIT | 057/2001 | IPCA | RCDM | REA 2837/2011 | 8/19/2012 | 8/22/2042 | R$26,260.56 | 6/1/2025 | Ativa | Substituição de 3 TCs do vão de manobra da LT 138 kV Joinville - Joinville IV C1 por superação (Reforço autorizado sem receita prévia reconhecido no reajuste do ciclo 2013-2014). *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | JOINVILLE | EL 138 kV JOINVILLE DIST4 | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$254,815.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | EL 138 kV JOINVILLE DIST4 | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/31/2023 | 2/2/2053 | R$20,788.79 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | JOINVILLE | EL 138 kV JOINVILLE DIST4 | DIT | 057/2001 | IPCA | RCDM | REN 905/2020 | 7/31/2019 | 7/30/2052 | R$88,139.01 | 6/1/2025 | Ativa | Superação de 1 Disjuntor do vão LT Joinville IV C1 (542). Capacidade do novo equipamento: Corrente de curto- circuito de no mínimo 40 kA.. Superação por Corrente de Curto-Circuito Simétrica. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | JOINVILLE | EL 138 kV JOINVILLE DIST3 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$145,187.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | EL 138 kV JOINVILLE DIST3 | DIT | 057/2001 | IPCA | RCDM | REA 2837/2011 | 8/19/2012 | 8/22/2042 | R$26,260.56 | 6/1/2025 | Ativa | Substituição de 3 TCs do vão de manobra da LT 138 kV Joinville - Tigre por superação (Reforço autorizado sem receita prévia reconhecido no reajuste do ciclo 2013-2014). *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | JOINVILLE | EL 138 kV JOINVILLE DIST3 | DIT | 057/2001 | IPCA | RCDM | REA 8314/2019 | 12/1/2021 | 11/30/2054 | R$86,319.58 | 6/1/2025 | Ativa | Superação de 1 Disjuntor do vão LT Joinville IV C2 (532). Capacidade do novo equipamento: Corrente de curto-circuito de no mínimo 40 kA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | JOINVILLE | EL 138 kV JOINVILLE DIST3 | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 6/30/2019 | 6/29/2043 | R$18,139.35 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | JOINVILLE | EL 138 kV JOINVILLE DIST2 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$145,187.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | EL 138 kV JOINVILLE DIST2 | DIT | 057/2001 | IPCA | RCDM | REA 2837/2011 | 8/19/2012 | 8/22/2042 | R$26,260.56 | 6/1/2025 | Ativa | Substituição de 3 TCs do vão de manobra da LT 138 kV Joinville - São Bento do Sul por superação (Reforço autorizado sem receita prévia reconhecido no reajuste do ciclo 2013-2014). *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | JOINVILLE | EL 138 kV JOINVILLE DIST2 | DIT | 057/2001 | IPCA | RCDM | REA 8314/2019 | 12/1/2021 | 11/30/2054 | R$86,319.58 | 6/1/2025 | Ativa | Superação de 1 Disjuntor do vão LT Joinville IV C1 (542). Capacidade do novo equipamento: Corrente de curto- circuito de no mínimo 40 kA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | JOINVILLE | EL 138 kV JOINVILLE DIST2 | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 10/1/2018 | 9/30/2042 | R$18,731.03 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | JOINVILLE | EL 138 kV JOINVILLE DIST1 | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$145,187.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | JOINVILLE | EL 138 kV JOINVILLE DIST1 | DIT | 057/2001 | IPCA | RCDM | REA 8314/2019 | 12/1/2021 | 11/30/2054 | R$86,319.58 | 6/1/2025 | Ativa | Substituição de 1 Disjuntor do vão LT WEG Fundição (602) . Capacidade do novo equipamento: Capacidade nominal de curto-circuito de no mínimo 40 kA. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Norte | JORGE TEIXEIRA | EL 230 kV JORGE TEIXEIRA LT 230 kV JORGE TEIXEIRA /LECHUGA C-3 AM | RB | FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-3 AM | 014/2012 | IPCA | RBL | CC 014/2012 | 7/1/2016 | 5/7/2042 | R$796,460.18 | 6/1/2025 | Ativa | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Norte | JORGE TEIXEIRA | EL 230 kV JORGE TEIXEIRA LT 230 kV JORGE TEIXEIRA /LECHUGA C-2 AM | RB | FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-2 AM | 009/2010 | IPCA | RBL | CC 009/2010 | 3/17/2014 | 7/12/2040 | R$879,249.58 | 6/1/2025 | Ativa | T2010-063 | *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Norte | JORGE TEIXEIRA | EL 230 kV JORGE TEIXEIRA LT 230 kV JORGE TEIXEIRA /LECHUGA C-1 AM | RB | FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-1 AM | 009/2010 | IPCA | RBL | CC 009/2010 | 3/17/2014 | 7/12/2040 | R$879,249.58 | 6/1/2025 | Ativa | T2010-063 | *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Nordeste | JUAZEIRO II | TT 69/13,8 kV JUAZEIRO II TA2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JUAZEIRO II | TT 69/13,8 kV JUAZEIRO II TA1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JUAZEIRO II | TR 69/13,8 kV JUAZEIRO II TR6 BA | RB | FT MG 230 kV JUAZEIRO II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | TR 69/13,8 kV JUAZEIRO II TR6 BA | RB | FT MG 230 kV JUAZEIRO II MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$76,466.27 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | TR 230/69 kV JUAZEIRO II TR4 BA | RBF | FT TR 230/69 kV JUAZEIRO II TR4 BA | 061/2001 | IPCA | RBNI | REA 2823/2011 | 9/28/2015 | 5/14/2050 | R$ 1,306,413.71 | 6/1/2025 | Ativa | T2009-123 | Instalar, na SE Juazeiro da Bahia II, um transformador trifásico 230/69 kV, de 100 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | JUAZEIRO II | TR 230/69 kV JUAZEIRO II TR3 BA | RBF | FT TR 230/69 kV JUAZEIRO II TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | TR 230/69 kV JUAZEIRO II TR3 BA | RBF | FT TR 230/69 kV JUAZEIRO II TR3 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | TR 230/69 kV JUAZEIRO II TR3 BA | RBF | FT TR 230/69 kV JUAZEIRO II TR3 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$913,997.96 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | TR 230/69 kV JUAZEIRO II TR2 BA | RBF | FT TR 230/69 kV JUAZEIRO II TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | TR 230/69 kV JUAZEIRO II TR1 BA | RBF | FT TR 230/69 kV JUAZEIRO II TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | TR 230/69 kV JUAZEIRO II TR1 BA | RBF | FT TR 230/69 kV JUAZEIRO II TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | MG 230 kV JUAZEIRO II MG1 BA | RB | FT MG 230 kV JUAZEIRO II MG1 BA | 061/2001 | IPCA | RBNI | REA 2823/2011 | 9/28/2015 | 8/12/2047 | R$ 1,842,733.08 | 6/1/2025 | Ativa | T2009-123 | Complemento, na SE Juazeiro da Bahia II, de infraestrutura de módulo geral pela instalação do transformador trifásico 230/69 kV, de 100 MVA e realocação, dentro da subestação, de um módulo de entrada de linha 230 kV, arranjo barra dupla a cinco chaves, para o segundo circuito da LT 230kV Sobradinho - Juazeiro da Bahia II. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | JUAZEIRO II | MG 230 kV JUAZEIRO II MG1 BA | RB | FT MG 230 kV JUAZEIRO II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$561,752.85 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | MG 230 kV JUAZEIRO II MG1 BA | RB | FT MG 230 kV JUAZEIRO II MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/30/2013 | 12/29/2041 | R$59,106.96 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SISTEMAS AUTOMÁTICOS DE REGULAÇÃO ASSOCIADOS A TRANSFORMADORES. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JUAZEIRO II | MG 230 kV JUAZEIRO II MG1 BA | RB | FT MG 230 kV JUAZEIRO II MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/27/2015 | 11/26/2032 | R$17,468.18 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição das Bateriais Saturnia 60PZS400 125 Vcc, Posições 800A1 e 800A2 .Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JUAZEIRO II | MG 230 kV JUAZEIRO II MG1 BA | RB | FT MG 230 kV JUAZEIRO II MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,576,373.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | MG 230 kV JUAZEIRO II MG1 BA | RB | FT MG 230 kV JUAZEIRO II MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,453,223.70 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | MG 230 kV JUAZEIRO II MG1 BA | RB | FT MG 230 kV JUAZEIRO II MG1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 8/11/2016 | 8/10/2033 | R$8,060.99 | 6/1/2025 | Ativa | Implantação de Banco de Baterias * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JUAZEIRO II | MG 230 kV JUAZEIRO II MG1 BA | RB | FT MG 230 kV JUAZEIRO II MG1 BA | 061/2001 | IPCA | RBNI | REA 2376/2010 | 12/13/2017 | 12/12/2047 | R$56,555.59 | 6/1/2025 | Ativa | Módulo de infraestrutura de manobra referente à instalação de 1 EL 69kV para SE SALITRE (EL 69 kV JUAZEIRO II 02M1). Receita incluída no recurso contra a REH 2.408/2018. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JUAZEIRO II | MG 230 kV JUAZEIRO II MG1 BA | RB | FT MG 230 kV JUAZEIRO II MG1 BA | 061/2001 | IPCA | RBNI | REA 2376/2010 | 12/13/2017 | 12/12/2047 | R$56,555.59 | 6/1/2025 | Ativa | Módulo de infraestrutura de manobra referente à instalação de 1 EL 69kV para SE SALITRE (EL 69 kV JUAZEIRO II 02M2). Receita incluída no recurso contra a REH 2.408/2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JUAZEIRO II | MG 230 kV JUAZEIRO II MG1 BA | RB | FT MG 230 kV JUAZEIRO II MG1 BA | 061/2001 | IPCA | RBNI | REA 7761/2019 | 7/31/2015 | 9/9/2036 | R$51,575.58 | 6/1/2025 | Ativa | Implantação de Sistema para acesso remoto a dispositivos de Proteção, Controle e Automação. Sistema composto de Painel com PCs Industriais (1 Concentrador, 1 Firewall, 1 Receptor GPS, 1 Switch Gerenciável) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JUAZEIRO II | MG 230 kV JUAZEIRO II MG1 BA | RB | FT MG 230 kV JUAZEIRO II MG1 BA | 061/2001 | IPCA | RBNI | REA 758/2006 | 12/20/2016 | 1/5/2045 | R$58,441.86 | 6/1/2025 | Ativa | MIM ASSOCIADO: 1 EL 69 kV para Petrolina I. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2023 - 2024 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JUAZEIRO II | MG 230 kV JUAZEIRO II MG1 BA | RB | FT MG 230 kV JUAZEIRO II MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/19/2021 | 2/10/2040 | R$503,597.72 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JUAZEIRO II | MG 230 kV JUAZEIRO II MG1 BA | RB | FT MG 230 kV JUAZEIRO II MG1 BA | 061/2001 | IPCA | RBNI | REA 5861/2016 | 7/27/2020 | 7/26/2048 | R$16,644.88 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE UTR Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JUAZEIRO II | MC 69 kV TT 69/13,8 kV JUAZEIRO II TA2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JUAZEIRO II | MC 69 kV TT 69/13,8 kV JUAZEIRO II TA1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JUAZEIRO II | MC 69 kV TR 69/13,8 kV JUAZEIRO II TR6 BA | RB | FT MG 230 kV JUAZEIRO II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | MC 69 kV TR 69/13,8 kV JUAZEIRO II TR6 BA | RB | FT MG 230 kV JUAZEIRO II MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | MC 69 kV TR 69/13,8 kV JUAZEIRO II TR6 BA | RB | FT MG 230 kV JUAZEIRO II MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$162,185.50 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | MC 69 kV TR 230/69 kV JUAZEIRO II TR4 BA | RBF | FT TR 230/69 kV JUAZEIRO II TR4 BA | 061/2001 | IPCA | RBNI | REA 2823/2011 | 9/28/2015 | 11/11/2047 | R$390,182.71 | 6/1/2025 | Ativa | T2009-123 | Instalar, na SE Juazeiro da Bahia II, um módulo de conexão 69 kV, arranjo barra principal e transferência, para o transformador trifásico 230/69 kV, de 100 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | JUAZEIRO II | MC 69 kV TR 230/69 kV JUAZEIRO II TR3 BA | RBF | FT TR 230/69 kV JUAZEIRO II TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | MC 69 kV TR 230/69 kV JUAZEIRO II TR3 BA | RBF | FT TR 230/69 kV JUAZEIRO II TR3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/11/2020 | 12/14/2048 | R$40,097.62 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JUAZEIRO II | MC 69 kV TR 230/69 kV JUAZEIRO II TR2 BA | RBF | FT TR 230/69 kV JUAZEIRO II TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | MC 69 kV TR 230/69 kV JUAZEIRO II TR2 BA | RBF | FT TR 230/69 kV JUAZEIRO II TR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | MC 69 kV TR 230/69 kV JUAZEIRO II TR2 BA | RBF | FT TR 230/69 kV JUAZEIRO II TR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$162,185.50 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | MC 69 kV TR 230/69 kV JUAZEIRO II TR1 BA | RBF | FT TR 230/69 kV JUAZEIRO II TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | MC 69 kV TR 230/69 kV JUAZEIRO II TR1 BA | RBF | FT TR 230/69 kV JUAZEIRO II TR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/11/2020 | 12/14/2048 | R$40,097.62 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JUAZEIRO II | MC 230 kV TR 230/69 kV JUAZEIRO II TR4 BA | RBF | FT TR 230/69 kV JUAZEIRO II TR4 BA | 061/2001 | IPCA | RBNI | REA 2823/2011 | 9/28/2015 | 12/20/2047 | R$ 1,113,822.98 | 6/1/2025 | Ativa | T2009-123 | Instalar, na SE Juazeiro da Bahia II, um módulo de conexão 230 kV, arranjo barra dupla a cinco chaves, para o transformador trifásico 230/69 kV, de 100 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | JUAZEIRO II | MC 230 kV TR 230/69 kV JUAZEIRO II TR3 BA | RBF | FT TR 230/69 kV JUAZEIRO II TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | MC 230 kV TR 230/69 kV JUAZEIRO II TR3 BA | RBF | FT TR 230/69 kV JUAZEIRO II TR3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/21/2021 | 3/20/2045 | R$25,082.06 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JUAZEIRO II | MC 230 kV TR 230/69 kV JUAZEIRO II TR2 BA | RBF | FT TR 230/69 kV JUAZEIRO II TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | MC 230 kV TR 230/69 kV JUAZEIRO II TR2 BA | RBF | FT TR 230/69 kV JUAZEIRO II TR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$454,511.36 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | MC 230 kV TR 230/69 kV JUAZEIRO II TR2 BA | RBF | FT TR 230/69 kV JUAZEIRO II TR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$419,003.95 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | MC 230 kV TR 230/69 kV JUAZEIRO II TR1 BA | RBF | FT TR 230/69 kV JUAZEIRO II TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | MC 230 kV TR 230/69 kV JUAZEIRO II TR1 BA | RBF | FT TR 230/69 kV JUAZEIRO II TR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/16/2021 | 9/3/2044 | R$26,337.95 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JUAZEIRO II | MC 13,8 kV TR 69/13,8 kV JUAZEIRO II TR6 BA | RB | FT MG 230 kV JUAZEIRO II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$48,477.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | MC 13,8 kV TR 13,8/0,22 kV JUAZEIRO II TR5 BA | RB | FT MG 230 kV JUAZEIRO II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | MC 13,8 kV TR 13,8/0,22 kV JUAZEIRO II TR4 BA | RB | FT MG 230 kV JUAZEIRO II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | IB 69 kV MG 230 kV JUAZEIRO II MG1 BA IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JUAZEIRO II | IB 230 kV MG 230 kV JUAZEIRO II MG1 BA IB1 | RB | FT MG 230 kV JUAZEIRO II MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,085.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | EL 69 kV JUAZEIRO II TOURAO 02C6 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JUAZEIRO II | EL 69 kV JUAZEIRO II TOURAO 02C6 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/4/2021 | 12/7/2049 | R$41,283.22 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JUAZEIRO II | EL 69 kV JUAZEIRO II SALITRE 02C8 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JUAZEIRO II | EL 69 kV JUAZEIRO II PETROLINA 02C9 | DIT | 061/2001 | IPCA | RCDM | REA 758/2006 | 12/20/2016 | 4/10/2046 | R$479,617.19 | 6/1/2025 | Ativa | 1 EL 69 kV para Petrolina I. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2023 - 2024 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | JUAZEIRO II | EL 69 kV JUAZEIRO II PETROLINA 02C5 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JUAZEIRO II | EL 69 kV JUAZEIRO II PETROLINA 02C5 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/20/2021 | 10/25/2049 | R$41,140.79 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JUAZEIRO II | EL 69 kV JUAZEIRO II PETROLINA 02C4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JUAZEIRO II | EL 69 kV JUAZEIRO II PETROLINA 02C4 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/7/2020 | 3/11/2049 | R$40,385.78 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JUAZEIRO II | EL 69 kV JUAZEIRO II JUNCO 02C7 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JUAZEIRO II | EL 69 kV JUAZEIRO II JUNCO 02C7 | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 12/21/2014 | 12/23/2044 | R$13,330.45 | 6/1/2025 | Ativa | Substituição de TC Superado 92C72-A e C.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | JUAZEIRO II | EL 69 kV JUAZEIRO II JUNCO 02C7 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JUAZEIRO II | EL 69 kV JUAZEIRO II JUNCO 02C7 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/7/2022 | 4/6/2046 | R$8,076.21 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JUAZEIRO II | EL 69 kV JUAZEIRO II JUAZEIRO I 02C3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JUAZEIRO II | EL 69 kV JUAZEIRO II JUAZEIRO I 02C3 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/21/2020 | 7/26/2049 | R$40,838.90 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JUAZEIRO II | EL 69 kV JUAZEIRO II JUAZEIRO I 02C2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JUAZEIRO II | EL 69 kV JUAZEIRO II JUAZEIRO I 02C2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/30/2021 | 9/3/2050 | R$42,179.70 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JUAZEIRO II | EL 69 kV JUAZEIRO II CARAIBA 02C1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | JUAZEIRO II | EL 69 kV JUAZEIRO II CARAIBA 02C1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/15/2022 | 4/2/2050 | R$30,827.30 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | JUAZEIRO II | EL 69 kV JUAZEIRO II 02M2 | DIT | 061/2001 | IPCA | RCDM | REA 2376/2010 | 12/13/2017 | 3/29/2050 | R$416,012.13 | 6/1/2025 | Ativa | Instalação de uma EL 69 kV para SE SALITRE. Receita incluída no recurso contra a REH 2.407/2018. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | JUAZEIRO II | EL 69 kV JUAZEIRO II 02M1 | DIT | 061/2001 | IPCA | RCDM | REA 2376/2010 | 12/13/2017 | 3/29/2050 | R$416,012.13 | 6/1/2025 | Ativa | Instalação de uma EL 69 kV para SE SALITRE. Receita incluída no recurso contra a REH 2.407/2018. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | JUAZEIRO II | EL 230 kV JUAZEIRO II LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA | RB | FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | EL 230 kV JUAZEIRO II LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA | RB | FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA | 061/2001 | IPCA | RBNI | REA 5861/2016 | 9/10/2015 | 9/9/2043 | R$30,686.16 | 6/1/2025 | Ativa | Esquema de Corte de carga para contingência dupla das LT 230 kV Sobradinho / Juazeiro da Bahia II (04S1 e 04S2) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JUAZEIRO II | EL 230 kV JUAZEIRO II LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA | RB | FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA | 061/2001 | IPCA | RBNI | REA 5861/2016 | 9/19/2017 | 10/22/2032 | R$89,384.90 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE SISTEMAS DE PROTEÇÃO E PAINÉIS ASSOCIADOS EM 03 TERMINAIS DE LINHAS DE TRANSMISSÃO (LTs-04S1 04S2 e 04N2). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JUAZEIRO II | EL 230 kV JUAZEIRO II LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA | RB | FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | EL 230 kV JUAZEIRO II LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA | RB | FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA | 061/2001 | IPCA | RBNI | REA 5861/2016 | 9/19/2017 | 9/18/2032 | R$44,015.31 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE SISTEMAS DE PROTEÇÃO E PAINÉIS ASSOCIADOS EM 03 TERMINAIS DE LINHAS DE TRANSMISSÃO (LTs-04S1 04S2 e 04N2). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JUAZEIRO II | EL 230 kV JUAZEIRO II LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA | RB | FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/10/2021 | 3/8/2046 | R$48,392.51 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JUAZEIRO II | EL 230 kV JUAZEIRO II LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA | RB | FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | EL 230 kV JUAZEIRO II LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA | RB | FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA | 061/2001 | IPCA | RBNI | REA 5861/2016 | 6/9/2016 | 6/8/2044 | R$21,849.00 | 6/1/2025 | Ativa | EL 230 kV JUAZEIRO II LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JUAZEIRO II | EL 230 kV JUAZEIRO II LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA | RB | FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/16/2021 | 7/10/2048 | R$62,923.90 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JUAZEIRO II | EL 230 kV JUAZEIRO II LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA | RB | FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA | 061/2001 | IPCA | RBNI | REA 2173/2009 | 9/27/2012 | 8/10/2039 | R$96,445.83 | 6/1/2025 | Ativa | T2009-152 | Adequar as proteções da EL 230 kV devido a derivação da LT 230 kV Juazeiro II/ Senhor do Bonfim II na SE Jaguarari *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | JUAZEIRO II | EL 230 kV JUAZEIRO II LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA | RB | FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | JUAZEIRO II | EL 230 kV JUAZEIRO II LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA | RB | FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/9/2021 | 8/1/2048 | R$84,397.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JUAZEIRO III | MG 500 kV JUAZEIRO III MG3 BA | RB | FT MG 500 kV JUAZEIRO III MG3 BA | 061/2001 | IPCA | RBNIA | REA 8328/2019 | R$817,933.74 | 6/1/2025 | Prevista | T2019-074 | Complementação do módulo geral da SE Juazeiro III com a instalação de um módulo de infraestrutura de manobra, em 500 kV, associado ao seccionamento da LT 500 kV Sobradinho - Luiz Gonzaga C2. | 4T25 | |||
| AXIA Energia Nordeste | JUAZEIRO III | MG 500 kV JUAZEIRO III MG3 BA | RB | FT MG 500 kV JUAZEIRO III MG3 BA | 061/2001 | IPCA | RBNIA | REA 8328/2019 | R$62,489.04 | 6/1/2025 | Prevista | T2019-074 | Adequação do sistema de proteção da SE Juazeiro III,associado ao seccionamento da LT 500 kV Sobradinho - Luiz Gonzaga C2. | 4T25 | |||
| AXIA Energia Nordeste | JUAZEIRO III | MG 500 kV JUAZEIRO III MG3 BA | RB | FT MG 500 kV JUAZEIRO III MG3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/11/2022 | 8/5/2045 | R$122,703.16 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | JUAZEIRO III | IB 500 kV MG 500 kV JUAZEIRO III MG3 BA IB6 | RB | FT MG 500 kV JUAZEIRO III MG3 BA | 061/2001 | IPCA | RBNIA | REA 8328/2019 | R$ 1,843,594.20 | 6/1/2025 | Prevista | T2019-074 | Instalação, na SE Juazeiro III, de uma interligação de barras em 500 kV, arranjo DJM, associada às entradas de linha para a SE Sobradinho e para SE Luiz Gonzaga. | 4T25 | |||
| AXIA Energia Nordeste | JUAZEIRO III | EL 500 kV JUAZEIRO III LT 500 kV US. L.GONZAGA /JUAZEIRO III C-2 PE/BA | RB | FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-2 PE/BA | 061/2001 | IPCA | RBNIA | REA 8328/2019 | R$ 1,608,362.90 | 6/1/2025 | Prevista | T2019-074 | Instalar, na SE JUAZEIRO III, um módulo de entrada de linha para o circuito LT 500 kV US. L.GONZAGA /JUAZEIRO III C-2 PE/BA originado do seccionamento do circuito LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA na SE JUAZEIRO III. | 4T25 | |||
| AXIA Energia Nordeste | JUAZEIRO III | EL 500 kV JUAZEIRO III LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA | RB | FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA | 061/2001 | IPCA | RBNI | REA 9689/2021 | 7/31/2019 | 12/31/2042 | R$100,678.42 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 500 kV, arranjo disjuntor e meio, na subestação Juazeiro da Bahia III, associada à linha de transmissão 500 kV Juazeiro da Bahia III - Luiz Gonzaga. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JUAZEIRO III | EL 500 kV JUAZEIRO III LT 500 kV JUAZEIRO III /U.SOBRADINHO C-2 BA | RB | FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-2 BA | 061/2001 | IPCA | RBNIA | REA 8328/2019 | R$ 1,608,362.90 | 6/1/2025 | Prevista | T2019-074 | Instalar, na SE JUAZEIRO III, um módulo de entrada de linha para o circuito LT 500 kV JUAZEIRO III /U.SOBRADINHO C-2 BA originado do seccionamento do circuito LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA na SE JUAZEIRO III. | 4T25 | |||
| AXIA Energia Nordeste | JUAZEIRO III | EL 500 kV JUAZEIRO III LT 500 kV JUAZEIRO III /FUTURA C-1 BA | RB | FT LT 500 kV JUAZEIRO III /FUTURA C-1 BA | 061/2001 | IPCA | RBNI | REA 9689/2021 | 7/31/2019 | 12/31/2042 | R$100,678.42 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 500 kV, arranjo disjuntor e meio, na subestação Juazeiro da Bahia III, associada à linha de transmissão 500 kV Sobradinho – Juazeiro da Bahia III. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | JUAZEIRO III | EL 500 kV JUAZEIRO III LT 500 kV JUAZEIRO III /FUTURA C-1 BA | RB | FT LT 500 kV JUAZEIRO III /FUTURA C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/20/2022 | 8/15/2045 | R$54,013.69 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | L.C.BARRETO | MG 500 kV L.C.BARRETO MG1 SP | RB | FT MG 500 kV L.C.BARRETO MG1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,214,456.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | L.C.BARRETO | MG 500 kV L.C.BARRETO MG1 SP | RB | FT MG 500 kV L.C.BARRETO MG1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/31/2017 | 3/27/2033 | R$3,219.06 | 6/1/2025 | Ativa | Substituição do Servidores e IHM do Sistema de Supervisão e Controle Local (SAGE) por obsolescência ou por atualização tecnológica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | L.C.BARRETO | MG 500 kV L.C.BARRETO MG1 SP | RB | FT MG 500 kV L.C.BARRETO MG1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 7/5/2016 | 4/1/2030 | R$15,455.46 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (004472/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | L.C.BARRETO | MG 500 kV L.C.BARRETO MG1 SP | RB | FT MG 500 kV L.C.BARRETO MG1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 7/5/2016 | 4/1/2030 | R$16,954.82 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (007696/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | L.C.BARRETO | MG 500 kV L.C.BARRETO MG1 SP | RB | FT MG 500 kV L.C.BARRETO MG1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 7/5/2016 | 4/1/2030 | R$24,266.39 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA - Nº Oper:- PMI (004259/2017) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | L.C.BARRETO | MG 500 kV L.C.BARRETO MG1 SP | RB | FT MG 500 kV L.C.BARRETO MG1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/27/2014 | 6/23/2031 | R$542,101.55 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | L.C.BARRETO | MC 345 kV TR 13,8/345 kV L.C.BARRETO TR6 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | L.C.BARRETO | MC 345 kV TR 13,8/345 kV L.C.BARRETO TR6 SP | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,046,877.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | L.C.BARRETO | MC 345 kV TR 13,8/345 kV L.C.BARRETO TR5 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | L.C.BARRETO | MC 345 kV TR 13,8/345 kV L.C.BARRETO TR5 SP | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,046,877.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | L.C.BARRETO | MC 345 kV TR 13,8/345 kV L.C.BARRETO TR5 SP | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,122,309.01 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | L.C.BARRETO | MC 345 kV TR 13,8/345 kV L.C.BARRETO TR4 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | L.C.BARRETO | MC 345 kV TR 13,8/345 kV L.C.BARRETO TR4 SP | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,046,877.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | L.C.BARRETO | MC 345 kV TR 13,8/345 kV L.C.BARRETO TR3 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | L.C.BARRETO | MC 345 kV TR 13,8/345 kV L.C.BARRETO TR3 SP | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,046,877.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | L.C.BARRETO | MC 345 kV TR 13,8/345 kV L.C.BARRETO TR3 SP | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,122,309.01 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | L.C.BARRETO | MC 345 kV TR 13,8/345 kV L.C.BARRETO TR2 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | L.C.BARRETO | MC 345 kV TR 13,8/345 kV L.C.BARRETO TR2 SP | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,046,877.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | L.C.BARRETO | MC 345 kV TR 13,8/345 kV L.C.BARRETO TR2 SP | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,122,309.01 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | L.C.BARRETO | MC 345 kV TR 13,8/345 kV L.C.BARRETO TR1 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | L.C.BARRETO | MC 345 kV TR 13,8/345 kV L.C.BARRETO TR1 SP | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,046,877.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | L.C.BARRETO | MC 345 kV TR 13,8/345 kV L.C.BARRETO TR1 SP | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,122,309.01 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | L.C.BARRETO | IB 345 kV MG 500 kV L.C.BARRETO MG1 SP IB2 | RB | FT MG 500 kV L.C.BARRETO MG1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | L.C.BARRETO | IB 345 kV MG 500 kV L.C.BARRETO MG1 SP IB2 | RB | FT MG 500 kV L.C.BARRETO MG1 SP | 062/2001 | IPCA | RBNI | REA 1814/2009 | 6/30/2012 | 2/24/2027 | R$39,205.49 | 6/1/2025 | Ativa | Substituição de equipamentos terminais (filtros de onda) no vão de interligação (superação de corrente de carga) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | L.C.BARRETO | IB 345 kV MG 500 kV L.C.BARRETO MG1 SP IB1 | RB | FT MG 500 kV L.C.BARRETO MG1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | L.C.BARRETO | IB 345 kV MG 500 kV L.C.BARRETO MG1 SP IB1 | RB | FT MG 500 kV L.C.BARRETO MG1 SP | 062/2001 | IPCA | RBNI | REA 1814/2009 | 9/2/2012 | 4/12/2039 | R$263,286.99 | 6/1/2025 | Ativa | Substituição de 1 DJ, 2 CS e 6 TC na IB *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | L.C.BARRETO | EL 345 kV L.C.BARRETO LT 345 kV L.C.BARRETO /VOLTA GRANDE C-1 SP/MG | RB | FT LT 345 kV L.C.BARRETO /VOLTA GRANDE C-1 SP/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | L.C.BARRETO | EL 345 kV L.C.BARRETO LT 345 kV L.C.BARRETO /VOLTA GRANDE C-1 SP/MG | RB | FT LT 345 kV L.C.BARRETO /VOLTA GRANDE C-1 SP/MG | 062/2001 | IPCA | RBNI | REA 1814/2009 | 7/9/2012 | 4/5/2027 | R$13,101.06 | 6/1/2025 | Ativa | BOBINAS DE BLOQUEIO SUPERADAS (saída Volta Grande (3)) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | L.C.BARRETO | EL 345 kV L.C.BARRETO LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG | RB | FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | L.C.BARRETO | EL 345 kV L.C.BARRETO LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG | RB | FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | L.C.BARRETO | EL 345 kV L.C.BARRETO LT 345 kV JAGUARA-US /L.C.BARRETO C-1 MG/SP | RB | FT LT 345 kV JAGUARA-US /L.C.BARRETO C-1 MG/SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | L.C.BARRETO | EL 345 kV L.C.BARRETO LT 345 kV JAGUARA-US /L.C.BARRETO C-1 MG/SP | RB | FT LT 345 kV JAGUARA-US /L.C.BARRETO C-1 MG/SP | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/27/2015 | 10/19/2042 | R$65,267.46 | 6/1/2025 | Ativa | Troca dos TC que atualmente limitam a LT com capacidade de 1164/1164 MVA a 920/932 MVA, capacidade de longa e curta duração, respectivamente. Reforço de Pequeno Porte reconhecido no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | L.C.BARRETO | EL 345 kV L.C.BARRETO LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP | RB | FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | L.C.BARRETO | EL 345 kV L.C.BARRETO LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP | RB | FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP | 062/2001 | IPCA | RBNI | REA 1814/2009 | 2/8/2012 | 9/16/2037 | R$341,194.18 | 6/1/2025 | Ativa | Substituição de 1 DJ, 5 CS, 3 TC e 3 BB na EL Furnas (Seccionada em Estreito) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | L.C.BARRETO | EL 345 kV L.C.BARRETO LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP | RB | FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,229,990.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | L.C.BARRETO | EL 345 kV L.C.BARRETO LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP | RB | FT LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | L.C.BARRETO | EL 345 kV L.C.BARRETO LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP | RB | FT LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP | 062/2001 | IPCA | RBNI | REA 1814/2009 | 5/6/2012 | 3/14/2038 | R$345,541.53 | 6/1/2025 | Ativa | Substituição de 1 DJ, 5 CS, 3 TC e 3 BB na EL Furnas (Seccionada em Estreito) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | L.GRANDE | TR 230/138 kV L.GRANDE TR2 RS | RBF | FT TR 230/138 kV L.GRANDE TR2 RS | 011/2010 | IPCA | RBNI | REA 4892/2014 | 9/29/2016 | 9/29/2050 | R$ 1,320,588.69 | 6/1/2025 | Ativa | T2014-052 | Instalação, na SE Lajeado Grande, do segundo autotransformador trifásico 230/138 kV, de 75 MVA. *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Sul | L.GRANDE | TR 230/138 kV L.GRANDE TR1 RS | RBF | FT TR 230/138 kV L.GRANDE TR1 RS | 011/2010 | IPCA | RBL | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$566,511.77 | 6/1/2025 | Ativa | T2010-078-D | Contrato de Concessão nº 011/2010SE Lajeado Grande 230/138kV - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Sul | L.GRANDE | MG 230 kV L.GRANDE MG2 RS | RB | FT MG 230 kV L.GRANDE MG2 RS | 011/2010 | IPCA | RBL | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$769,711.83 | 6/1/2025 | Ativa | T2010-078-D | Contrato de Concessão nº 011/2010SE Lajeado Grande 230/138kV - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Sul | L.GRANDE | MG 230 kV L.GRANDE MG2 RS | RB | FT MG 230 kV L.GRANDE MG2 RS | 011/2010 | IPCA | RBNI | REA 4892/2014 | 9/29/2016 | 9/29/2048 | R$165,367.37 | 6/1/2025 | Ativa | T2014-052 | Complementação, na SE Lajeado Grande, da infraestrutura do Módulo Geral, referente à instalação de um módulo de conexão em 230 kV, arranjo barra dupla a quatro chaves, para o segundo autotransformador 230/138 kV a ser instalado. *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Sul | L.GRANDE | MG 230 kV L.GRANDE MG2 RS | RB | FT MG 230 kV L.GRANDE MG2 RS | 011/2010 | IPCA | RBNI | REA 4892/2014 | 9/29/2016 | 9/29/2047 | R$96,264.28 | 6/1/2025 | Ativa | T2014-052 | Complementação, na SE Lajeado Grande, da infraestrutura do Módulo Geral, referente à instalação de um módulo de conexão em 138 kV, arranjo barra dupla a quatro chaves, para o segundo autotransformador 230/138 kV a ser instalado. *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Sul | L.GRANDE | MG 230 kV L.GRANDE MG1 RS | RB | FT MG 230 kV L.GRANDE MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,172.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | L.GRANDE | MG 230 kV L.GRANDE MG1 RS | RB | FT MG 230 kV L.GRANDE MG1 RS | 057/2001 | IPCA | RMEL | REN 643/2014 | 3/13/2013 | 3/12/2030 | R$17,022.80 | 6/1/2025 | Ativa | Substituição de 2 baterias 48 Vcc.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | L.GRANDE | MG 230 kV L.GRANDE MG1 RS | RB | FT MG 230 kV L.GRANDE MG1 RS | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/17/2019 | 5/16/2036 | R$23,328.43 | 6/1/2025 | Ativa | Instalação de 1 carregador de bateria de 48 Vcc * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | L.GRANDE | MG 230 kV L.GRANDE MG1 RS | RB | FT MG 230 kV L.GRANDE MG1 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 2/3/2019 | 3/30/2035 | R$63,766.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | L.GRANDE | MG 230 kV L.GRANDE MG1 RS | RB | FT MG 230 kV L.GRANDE MG1 RS | 057/2001 | IPCA | RBNI | DSP 4033/2021 | 4/6/2020 | 4/5/2035 | R$9,049.35 | 6/1/2025 | Ativa | Substituição do sistema de registro de perturbações (RDP) - OSC 230-1.. Equipamento de tecnologia obsoleta. Final de vida útil. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | L.GRANDE | MC 230 kV TR 230/138 kV L.GRANDE TR2 RS | RBF | FT TR 230/138 kV L.GRANDE TR2 RS | 011/2010 | IPCA | RBNI | REA 4892/2014 | 9/29/2016 | 9/29/2040 | R$ 1,128,502.49 | 6/1/2025 | Ativa | T2014-052 | Instalação, na SE Lajeado Grande, de um módulo de conexão 230 kV, arranjo barra dupla a quatro chaves, para o segundo autotransformador trifásico 230/138 kV, de 75 MVA a ser instalado. *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Sul | L.GRANDE | MC 230 kV TR 230/138 kV L.GRANDE TR1 RS | RBF | FT TR 230/138 kV L.GRANDE TR1 RS | 011/2010 | IPCA | RBL | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$351,691.40 | 6/1/2025 | Ativa | T2010-078-D | Contrato de Concessão nº 011/2010SE Lajeado Grande 230/138kV - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Sul | L.GRANDE | MC 230 kV TR 230/138 kV L.GRANDE TR1 RS | RBF | FT TR 230/138 kV L.GRANDE TR1 RS | 011/2010 | IPCA | RBNI | DSP 386/2021 | 2/17/2021 | 2/16/2036 | R$40,467.54 | 6/1/2025 | Ativa | Aquisição e instalação de mód. de entrada de dados analógicos, para inclusão da monitoração de variáveis adicionais no TF1. Este novo módulo deverá ser integrado na unidade central de registros de perturbações, já existente. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 | |||
| AXIA Energia Sul | L.GRANDE | MC 138 kV TR 230/138 kV L.GRANDE TR2 RS | RBF | FT TR 230/138 kV L.GRANDE TR2 RS | 011/2010 | IPCA | RBNI | REA 4892/2014 | 9/29/2016 | 9/29/2038 | R$863,078.87 | 6/1/2025 | Ativa | T2014-052 | Instalação, na SE Lajeado Grande, de um módulo de conexão 138 kV, arranjo barra dupla a quatro chaves, para o segundo autotransformador trifásico 230/138 kV, de 75 MVA a ser instalado. *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Sul | L.GRANDE | MC 138 kV TR 230/138 kV L.GRANDE TR1 RS | RBF | FT TR 230/138 kV L.GRANDE TR1 RS | 011/2010 | IPCA | RBL | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$273,300.17 | 6/1/2025 | Ativa | T2010-078-D | Contrato de Concessão nº 011/2010SE Lajeado Grande 230/138kV - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Sul | L.GRANDE | IB 230 kV MG 230 kV L.GRANDE MG1 RS IB1 | RB | FT MG 230 kV L.GRANDE MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$100,223.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | L.GRANDE | IB 138 kV MG 230 kV L.GRANDE MG2 RS IB1 | DIT | 011/2010 | IPCA | RPEC | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$187,448.57 | 6/1/2025 | Ativa | T2010-078-D | Contrato de Concessão nº 011/2010SE Lajeado Grande 230/138kV - RPEC *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Sul | L.GRANDE | EL 230 kV L.GRANDE LT 230 kV L.GRANDE /CAXIAS SUL 5 C-1 RS | RB | FT LT 230 kV L.GRANDE /CAXIAS SUL 5 C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | L.GRANDE | EL 230 kV L.GRANDE LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS | RB | FT LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | L.GRANDE | EL 138 kV L.GRANDE VACARIA | DIT | 011/2010 | IPCA | RPEC | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$364,036.41 | 6/1/2025 | Ativa | T2010-078-D | Contrato de Concessão nº 011/2010SE Lajeado Grande 230/138kV - RPEC *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Sul | L.GRANDE | EL 138 kV L.GRANDE JAQUIRANA | DIT | 011/2010 | IPCA | RPEC | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$364,036.41 | 6/1/2025 | Ativa | T2010-078-D | Contrato de Concessão nº 011/2010SE Lajeado Grande 230/138kV - RPEC *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | LAGOA DO CARRO | EL 230 kV LAGOA DO CARRO LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE | RB | FT LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE | 061/2001 | IPCA | RBNI | REA 9687/2021 | 10/22/2020 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Lagoa do Carro, associada à linha de transmissão 230 kV Pau Ferro – Lagoa do Carro. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LAGOA DO CARRO | EL 230 kV LAGOA DO CARRO LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE | RB | FT LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE | 061/2001 | IPCA | RBNI | REA 9687/2021 | 10/22/2020 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Andirá Leste, associada à linha de transmissão 230 kV Lagoa do Carro – Coteminas. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LAGOA NOVA II | TT 69/0 kV LAGOA NOVA II TA1 RN | ICG | 010/2011 | IPCA | RICG | CC 010/2011 | 12/21/2015 | 1/14/2034 | R$198,686.99 | 6/1/2025 | Ativa | T2012-032-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | LAGOA NOVA II | TR 230/69 kV LAGOA NOVA II TR3 RN | ICG | 010/2011 | IPCA | RICGNI | REA 4876/2014 | 11/28/2016 | 1/14/2034 | R$ 1,754,874.45 | 6/1/2025 | Ativa | T2014-068 | Instalação, na subestação Lagoa Nova II, do terceiro transformador trifásico 230/69 kV, de 150 MVA. *Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Nordeste | LAGOA NOVA II | TR 230/69 kV LAGOA NOVA II TR2 RN | ICG | 010/2011 | IPCA | RICG | CC 010/2011 | 12/21/2015 | 1/14/2034 | R$ 1,182,258.58 | 6/1/2025 | Ativa | T2012-032-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | LAGOA NOVA II | TR 230/69 kV LAGOA NOVA II TR1 RN | ICG | 010/2011 | IPCA | RICG | CC 010/2011 | 12/21/2015 | 1/14/2034 | R$ 1,182,258.58 | 6/1/2025 | Ativa | T2012-032-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | LAGOA NOVA II | MG 230 kV LAGOA NOVA II MG1 RN | RB | FT MG 230 kV LAGOA NOVA II MG1 RN | 010/2011 | IPCA | RBL | CC 010/2011 | 10/13/2011 | 10/13/2041 | R$940,647.27 | 6/1/2025 | Ativa | T2012-032-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | LAGOA NOVA II | MG 230 kV LAGOA NOVA II MG1 RN | RB | FT MG 230 kV LAGOA NOVA II MG1 RN | 010/2011 | IPCA | RBNI | REA 4876/2014 | 11/28/2016 | 11/27/2048 | R$59,513.89 | 6/1/2025 | Ativa | T2014-068 | Complementação do módulo geral da subestação Lagoa Nova II com um módulo de infraestrutura de manobra em 230 kV.*Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | LAGOA NOVA II | MG 230 kV LAGOA NOVA II MG1 RN | RB | FT MG 230 kV LAGOA NOVA II MG1 RN | 010/2011 | IPCA | RBNI | REA 4876/2014 | 11/28/2016 | 11/27/2033 | R$16,618.57 | 6/1/2025 | Ativa | T2014-068 | Complementação do módulo geral da subestação Lagoa Nova II com um módulo de infraestrutura de manobra em 69 kV.*Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Nordeste | LAGOA NOVA II | MG 230 kV LAGOA NOVA II MG1 RN | RB | FT MG 230 kV LAGOA NOVA II MG1 RN | 010/2011 | IPCA | RBNI | REN 905/2020 | 10/28/2022 | 10/27/2053 | R$51,399.30 | 6/1/2025 | Ativa | MIM ASSOCIADO: Implantação de um módulo de Entrada de Linha em 69kV, arranjo barra principal e transferência, com destino à SE Lagoa Nova do Seridó na SE LAGOA NOVA II * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2023 - 2024 | |||
| AXIA Energia Nordeste | LAGOA NOVA II | MC 69 kV TT 69/0 kV LAGOA NOVA II TA1 RN | ICG | 010/2011 | IPCA | RICG | CC 010/2011 | 12/21/2015 | 1/14/2034 | R$73,964.40 | 6/1/2025 | Ativa | T2012-032-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | LAGOA NOVA II | MC 69 kV TR 230/69 kV LAGOA NOVA II TR3 RN | ICG | 010/2011 | IPCA | RICGNI | REA 4876/2014 | 11/28/2016 | 1/14/2034 | R$241,565.88 | 6/1/2025 | Ativa | T2014-068 | Instalação, na subestação Lagoa Nova II de um módulo de conexão de transformador em 69 kV, arranjo barra principal e transferência. *Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Nordeste | LAGOA NOVA II | MC 69 kV TR 230/69 kV LAGOA NOVA II TR2 RN | ICG | 010/2011 | IPCA | RICG | CC 010/2011 | 12/21/2015 | 1/14/2034 | R$175,253.60 | 6/1/2025 | Ativa | T2012-032-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | LAGOA NOVA II | MC 69 kV TR 230/69 kV LAGOA NOVA II TR1 RN | ICG | 010/2011 | IPCA | RICG | CC 010/2011 | 12/21/2015 | 1/14/2034 | R$175,253.60 | 6/1/2025 | Ativa | T2012-032-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | LAGOA NOVA II | MC 230 kV TR 230/69 kV LAGOA NOVA II TR3 RN | ICG | 010/2011 | IPCA | RICGNI | REA 4876/2014 | 11/28/2016 | 1/14/2034 | R$651,902.25 | 6/1/2025 | Ativa | T2014-068 | Instalação, na subestação Lagoa Nova II de um módulo de conexão de transformador em 230 kV, arranjo barra dupla a quatro chaves. *Receita revisada no reajuste do ciclo 2017-2018. *(Receita revisada em 14/06/2017) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Nordeste | LAGOA NOVA II | MC 230 kV TR 230/69 kV LAGOA NOVA II TR2 RN | ICG | 010/2011 | IPCA | RICG | CC 010/2011 | 12/21/2015 | 1/14/2034 | R$430,863.88 | 6/1/2025 | Ativa | T2012-032-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | LAGOA NOVA II | MC 230 kV TR 230/69 kV LAGOA NOVA II TR1 RN | ICG | 010/2011 | IPCA | RICG | CC 010/2011 | 12/21/2015 | 1/14/2034 | R$430,863.88 | 6/1/2025 | Ativa | T2012-032-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | LAGOA NOVA II | IB 69 kV MG 230 kV LAGOA NOVA II MG1 RN IB1 | ICG | 010/2011 | IPCA | RICG | CC 010/2011 | 12/21/2015 | 1/14/2034 | R$120,149.70 | 6/1/2025 | Ativa | T2012-032-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | LAGOA NOVA II | IB 230 kV MG 230 kV LAGOA NOVA II MG1 RN IB1 | RB | FT MG 230 kV LAGOA NOVA II MG1 RN | 010/2011 | IPCA | RBL | CC 010/2011 | 10/13/2011 | 10/13/2041 | R$333,089.19 | 6/1/2025 | Ativa | T2012-032-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | LAGOA NOVA II | EL 69 kV LAGOA NOVA II L.N. DO SERIDO | DIT | 010/2011 | IPCA | RCDM | REN 905/2020 | 10/28/2022 | 10/27/2050 | R$704,635.75 | 6/1/2025 | Ativa | Implantação de um módulo de Entrada de Linha em 69kV, arranjo barra principal e transferência, com destino à SE Lagoa Nova do Seridó na SE LAGOA NOVA II * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2023 - 2024 | ||||
| AXIA Energia Nordeste | LAGOA NOVA II | EL 230 kV LAGOA NOVA II LT 230 kV PARAISO /LAGOA NOVA II C-1 RN | RB | FT LT 230 kV PARAISO /LAGOA NOVA II C-1 RN | 010/2011 | IPCA | RBL | CC 010/2011 | 10/13/2011 | 10/13/2041 | R$617,098.55 | 6/1/2025 | Ativa | T2012-032-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia | LAGOS | MG 345 kV LAGOS MG3 RJ | RB | FT MG 345 kV LAGOS MG3 RJ | 062/2001 | IPCA | RBNIA | REA 13338/2022 | R$698,051.90 | 6/1/2025 | Prevista | T2022-112 | Módulo de Infraestrutura Geral para Acessante na SE Lagos devido ao seccionamento da LT 345 MACAE MERCHAN /VENDA DAS PEDRAS C-1 RJ na SE LAGOS. | ||||
| AXIA Energia | LAGOS | MG 345 kV LAGOS MG3 RJ | RB | FT MG 345 kV LAGOS MG3 RJ | 062/2001 | IPCA | RBNIA | REA 13338/2022 | R$490,381.62 | 6/1/2025 | Prevista | T2022-112 | Adequação do Módulo de Infraestrutura de Manobra na SE Lagos do vão daLT 345 kV MACAE MERCHAN /LAGOS C-1 RJ originado do seccionamento do circuito LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ na SE LAGOS | ||||
| AXIA Energia | LAGOS | MG 345 kV LAGOS MG3 RJ | RB | FT MG 345 kV LAGOS MG3 RJ | 062/2001 | IPCA | RBNIA | REA 13338/2022 | R$490,381.62 | 6/1/2025 | Prevista | T2022-112 | Adequação do Módulo de Infraestrutura de Manobra na SE Lagos do vão daLT 345 kV LAGOS /VENDA PEDRAS C-1 RJ originado do seccionamento do circuito LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ na SE LAGOS | ||||
| AXIA Energia | LAGOS | MG 345 kV LAGOS MG3 RJ | RB | FT MG 345 kV LAGOS MG3 RJ | 062/2001 | IPCA | RBNI | DSP 978/2024 | 11/1/2023 | 10/31/2041 | R$73,831.43 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura Geral de Acessante -MIG-A 345 kV na SE Lagos, em função do seccionamento da LT 345 kV Comperj - Macaé Merchan C1. | |||
| AXIA Energia | LAGOS | IB 345 kV MG 345 kV LAGOS MG3 RJ IB6 | RB | FT MG 345 kV LAGOS MG3 RJ | 062/2001 | IPCA | RBNIA | REA 13338/2022 | R$ 1,980,608.83 | 6/1/2025 | Prevista | T2022-112 | Instalação de Módulo de Manobra Interligação de Barras (IB) na SE Lagos do vão daLT 345 kV LAGOS /VENDA PEDRAS C-1 RJ originado do seccionamento do circuito LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ na SE LAGOS | ||||
| AXIA Energia | LAGOS | IB 345 kV MG 345 kV LAGOS MG3 RJ IB5 | RB | FT MG 345 kV LAGOS MG3 RJ | 062/2001 | IPCA | RBNIA | REA 13338/2022 | R$ 1,980,608.83 | 6/1/2025 | Prevista | T2022-112 | Instalação de Módulo de Manobra Interligação de Barras (IB) na SE Lagos do vão daLT 345 kV MACAE MERCHAN /LAGOS C-1 RJ originado do seccionamento do circuito LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ na SE LAGOS | ||||
| AXIA Energia | LAGOS | EL 345 kV LAGOS LT 345 kV MACAE MERCHAN /LAGOS C-2 RJ | RB | FT LT 345 kV MACAE MERCHAN /LAGOS C-2 RJ | 062/2001 | IPCA | RBNIA | REA 13338/2022 | R$ 1,880,802.92 | 6/1/2025 | Prevista | T2022-112 | Instalar, na SE LAGOS, um módulo de entrada de linha para o circuito LT 345 kV MACAE MERCHAN /LAGOS C-1 RJ originado do seccionamento do circuito LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ na SE LAGOS. | ||||
| AXIA Energia | LAGOS | EL 345 kV LAGOS LT 345 kV MACAE MERCHAN /LAGOS C-1 RJ | RB | FT LT 345 kV MACAE MERCHAN /LAGOS C-1 RJ | 062/2001 | IPCA | RBNI | DSP 978/2024 | 11/1/2023 | 10/31/2051 | R$217,523.18 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 345 kV,arranjo Disjuntor e Meio, na subestação Lagos, associada à Linha de Transmissão 345 kV Lagos – Macaé Merchan C1. | |||
| AXIA Energia | LAGOS | EL 345 kV LAGOS LT 345 kV LAGOS /VENDA PEDRAS C-1 RJ | RB | FT LT 345 kV LAGOS /VENDA PEDRAS C-1 RJ | 062/2001 | IPCA | RBNIA | REA 13338/2022 | R$ 1,880,802.92 | 6/1/2025 | Prevista | T2022-112 | Instalar, na SE LAGOS, um módulo de entrada de linha para o circuito LT 345 kV LAGOS /VENDA PEDRAS C-1 RJ originado do seccionamento do circuito LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ na SE LAGOS. | ||||
| AXIA Energia | LAGOS | EL 345 kV LAGOS LT 345 kV COMPERJ /LAGOS C-1 RJ | RB | FT LT 345 kV COMPERJ /LAGOS C-1 RJ | 062/2001 | IPCA | RBNI | DSP 978/2024 | 11/1/2023 | 10/31/2051 | R$217,523.18 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 345 kV,arranjo Disjuntor e Meio, na subestação Lagos, associada à Linha de Transmissão 345 kV Comperj – Lagos C1. | |||
| AXIA Energia Norte | LECHUGA | TR 230/138 kV LECHUGA TR3 AM | RBF | FT TR 230/138 kV LECHUGA TR3 AM | 014/2012 | IPCA | RBL | CC 014/2012 | 4/1/2015 | 5/7/2042 | R$ 1,748,483.95 | 6/1/2025 | Ativa | T2012-056 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | LECHUGA | TR 230/138 kV LECHUGA TR2 AM | RBF | FT TR 230/138 kV LECHUGA TR2 AM | 014/2012 | IPCA | RBL | CC 014/2012 | 4/1/2015 | 5/7/2042 | R$ 1,748,483.95 | 6/1/2025 | Ativa | T2012-056 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | LECHUGA | TR 230/138 kV LECHUGA TR1 AM | RBF | FT TR 230/138 kV LECHUGA TR1 AM | 014/2012 | IPCA | RBL | CC 014/2012 | 4/1/2015 | 5/7/2042 | R$ 1,748,483.95 | 6/1/2025 | Ativa | T2012-056 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | LECHUGA | MG 230 kV LECHUGA MG2 AM | RB | FT MG 230 kV LECHUGA MG2 AM | 014/2012 | IPCA | RBL | CC 014/2012 | 4/1/2015 | 5/7/2042 | R$982,821.59 | 6/1/2025 | Ativa | T2012-056 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | LECHUGA | MC 230 kV TR 230/138 kV LECHUGA TR3 AM | RBF | FT TR 230/138 kV LECHUGA TR3 AM | 014/2012 | IPCA | RBL | CC 014/2012 | 4/1/2015 | 5/7/2042 | R$455,205.91 | 6/1/2025 | Ativa | T2012-056 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | LECHUGA | MC 230 kV TR 230/138 kV LECHUGA TR2 AM | RBF | FT TR 230/138 kV LECHUGA TR2 AM | 014/2012 | IPCA | RBL | CC 014/2012 | 4/1/2015 | 5/7/2042 | R$455,205.91 | 6/1/2025 | Ativa | T2012-056 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | LECHUGA | MC 230 kV TR 230/138 kV LECHUGA TR1 AM | RBF | FT TR 230/138 kV LECHUGA TR1 AM | 014/2012 | IPCA | RBL | CC 014/2012 | 4/1/2015 | 5/7/2042 | R$455,205.91 | 6/1/2025 | Ativa | T2012-056 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | LECHUGA | MC 138 kV TR 230/138 kV LECHUGA TR3 AM | RBF | FT TR 230/138 kV LECHUGA TR3 AM | 014/2012 | IPCA | RBL | CC 014/2012 | 4/1/2015 | 5/7/2042 | R$339,671.73 | 6/1/2025 | Ativa | T2012-056 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | LECHUGA | MC 138 kV TR 230/138 kV LECHUGA TR2 AM | RBF | FT TR 230/138 kV LECHUGA TR2 AM | 014/2012 | IPCA | RBL | CC 014/2012 | 4/1/2015 | 5/7/2042 | R$339,671.73 | 6/1/2025 | Ativa | T2012-056 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | LECHUGA | MC 138 kV TR 230/138 kV LECHUGA TR1 AM | RBF | FT TR 230/138 kV LECHUGA TR1 AM | 014/2012 | IPCA | RBL | CC 014/2012 | 4/1/2015 | 5/7/2042 | R$339,671.73 | 6/1/2025 | Ativa | T2012-056 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | LECHUGA | IB 138 kV MG 230 kV LECHUGA MG2 AM IB1 | DIT | 014/2012 | IPCA | RPEC | CC 014/2012 | 4/1/2015 | 5/7/2042 | R$295,205.39 | 6/1/2025 | Ativa | T2012-056 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Norte | LECHUGA | EL 230 kV LECHUGA LT 230 kV JORGE TEIXEIRA /LECHUGA C-3 AM | RB | FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-3 AM | 014/2012 | IPCA | RBL | CC 014/2012 | 7/1/2016 | 5/7/2042 | R$796,460.18 | 6/1/2025 | Ativa | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Norte | LECHUGA | EL 230 kV LECHUGA LT 230 kV JORGE TEIXEIRA /LECHUGA C-2 AM | RB | FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-2 AM | 009/2010 | IPCA | RBL | CC 009/2010 | 3/17/2014 | 7/12/2040 | R$879,249.58 | 6/1/2025 | Ativa | T2010-063 | *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Norte | LECHUGA | EL 230 kV LECHUGA LT 230 kV JORGE TEIXEIRA /LECHUGA C-1 AM | RB | FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-1 AM | 009/2010 | IPCA | RBL | CC 009/2010 | 3/17/2014 | 7/12/2040 | R$879,249.58 | 6/1/2025 | Ativa | T2010-063 | *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Norte | LECHUGA | EL 138 kV LECHUGA DIST3 | DIT | 014/2012 | IPCA | RPEC | CC 014/2012 | 4/1/2015 | 5/7/2042 | R$514,070.79 | 6/1/2025 | Ativa | T2012-056 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Norte | LECHUGA | EL 138 kV LECHUGA DIST2 | DIT | 014/2012 | IPCA | RPEC | CC 014/2012 | 4/1/2015 | 5/7/2042 | R$514,070.79 | 6/1/2025 | Ativa | T2012-056 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Norte | LECHUGA | EL 138 kV LECHUGA DIST1 | DIT | 014/2012 | IPCA | RPEC | CC 014/2012 | 4/1/2015 | 5/7/2042 | R$514,070.79 | 6/1/2025 | Ativa | T2012-056 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia | LINHARES | TR 230/138 kV LINHARES TRR1 ES | RBF | FT TR 230/138 kV LINHARES TRR1 ES | 006/2010 | IPCA | RBL | CC 006/2010 | 8/14/2018 | 7/12/2040 | R$367,392.27 | 6/1/2025 | Ativa | T2010-060 | Contrato de Concessão nº 006/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia | LINHARES | TR 230/138 kV LINHARES TR1 ES | RBF | FT TR 230/138 kV LINHARES TR1 ES | 006/2010 | IPCA | RBL | CC 006/2010 | 8/14/2018 | 7/12/2040 | R$ 1,102,174.56 | 6/1/2025 | Ativa | T2010-060 | Contrato de Concessão nº 006/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia | LINHARES | MG 230 kV LINHARES MG1 ES | RB | FT MG 230 kV LINHARES MG1 ES | 006/2010 | IPCA | RBL | CC 006/2010 | 8/14/2018 | 7/12/2040 | R$ 1,033,163.55 | 6/1/2025 | Ativa | T2010-060 | Contrato de Concessão nº 006/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia | LINHARES | MC 230 kV TR 230/138 kV LINHARES TR1 ES | RBF | FT TR 230/138 kV LINHARES TR1 ES | 006/2010 | IPCA | RBL | CC 006/2010 | 8/14/2018 | 7/12/2040 | R$458,859.45 | 6/1/2025 | Ativa | T2010-060 | Contrato de Concessão nº 006/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia | LINHARES | MC 138 kV TR 230/138 kV LINHARES TR1 ES | RBF | FT TR 230/138 kV LINHARES TR1 ES | 006/2010 | IPCA | RBL | CC 006/2010 | 8/14/2018 | 7/12/2040 | R$356,458.12 | 6/1/2025 | Ativa | T2010-060 | Contrato de Concessão nº 006/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia | LINHARES | IB 230 kV MG 230 kV LINHARES MG1 ES IB1 | RB | FT MG 230 kV LINHARES MG1 ES | 006/2010 | IPCA | RBL | CC 006/2010 | 8/14/2018 | 7/12/2040 | R$337,302.61 | 6/1/2025 | Ativa | T2010-060 | Contrato de Concessão nº 006/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia | LINHARES | IB 138 kV MG 230 kV LINHARES MG1 ES IB1 | DIT | 006/2010 | IPCA | RPEC | CC 006/2010 | 8/14/2018 | 7/12/2040 | R$251,828.07 | 6/1/2025 | Ativa | T2010-060 | Contrato de Concessão nº 006/2010 RPEC *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | |||
| AXIA Energia | LINHARES | EL 230 kV LINHARES LT 230 kV U.MASCARENHAS /LINHARES C-1 ES | RB | FT LT 230 kV U.MASCARENHAS /LINHARES C-1 ES | 006/2010 | IPCA | RBL | CC 006/2010 | 8/14/2018 | 7/12/2040 | R$649,591.08 | 6/1/2025 | Ativa | T2010-060 | Contrato de Concessão nº 006/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia | LINHARES | EL 138 kV LINHARES DIST4 | DIT | 006/2010 | IPCA | RPEC | CC 006/2010 | 8/14/2018 | 7/12/2040 | R$502,287.70 | 6/1/2025 | Ativa | T2010-060 | Contrato de Concessão nº 006/2010 RPEC *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | |||
| AXIA Energia | LINHARES | EL 138 kV LINHARES DIST3 | DIT | 006/2010 | IPCA | RPEC | CC 006/2010 | 8/14/2018 | 7/12/2040 | R$502,287.70 | 6/1/2025 | Ativa | T2010-060 | Contrato de Concessão nº 006/2010 RPEC *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | |||
| AXIA Energia | LINHARES | EL 138 kV LINHARES DIST2 | DIT | 006/2010 | IPCA | RPEC | CC 006/2010 | 8/14/2018 | 7/12/2040 | R$502,287.70 | 6/1/2025 | Ativa | T2010-060 | Contrato de Concessão nº 006/2010 RPEC *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | |||
| AXIA Energia | LINHARES | EL 138 kV LINHARES DIST1 | DIT | 006/2010 | IPCA | RPEC | CC 006/2010 | 8/14/2018 | 7/12/2040 | R$502,287.70 | 6/1/2025 | Ativa | T2010-060 | Contrato de Concessão nº 006/2010 RPEC *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | |||
| AXIA Energia Sul | LIVRAMENTO 2 | EL 230 kV LIVRAMENTO 2 LT 230 kV LIVRAMENTO 2 /RIVERA URU C-1 RS | RB | FT LT 230 kV LIVRAMENTO 2 /RIVERA URU C-1 RS | 057/2001 | IPCA | RBNI | PRT 657/2022 | 3/24/2023 | 12/31/2042 | R$236,469.24 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo BD4, na Subestação Livramento 2, associada a LT 230 kV Rivera - Livramento 2. | |||
| AXIA Energia Sul | LONDRINA COT | MG 230 kV LONDRINA COT MG2 PR | RB | FT MG 230 kV LONDRINA COT MG2 PR | 057/2001 | IPCA | RBNI | REA 7576/2019 | 12/14/2020 | 7/30/2041 | R$332,881.69 | 6/1/2025 | Ativa | T2018-096 | Instalação, na Subestação Londrina COPEL, de um Módulo de Infra-estrutura Geral para Acessantes *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | LONDRINA COT | MG 230 kV LONDRINA COT MG2 PR | RB | FT MG 230 kV LONDRINA COT MG2 PR | 057/2001 | IPCA | RBNI | REA 7576/2019 | 12/14/2020 | 4/20/2050 | R$602,466.70 | 6/1/2025 | Ativa | T2018-096 | Complementação do módulo geral, na Subestação Londrina COPEL, com dois módulos de infra-estrutura de manobra. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | LONDRINA COT | MG 230 kV LONDRINA COT MG2 PR | RB | FT MG 230 kV LONDRINA COT MG2 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 2/28/2021 | 2/27/2038 | R$27,549.34 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | LONDRINA COT | EL 230 kV LONDRINA COT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR | RB | FT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR | 057/2001 | IPCA | RBNI | REA 7576/2019 | 12/14/2020 | 1/5/2049 | R$ 1,690,488.58 | 6/1/2025 | Ativa | T2018-096 | Instalar, na SE LONDRINA COT, um módulo de entrada de linha para o circuito LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR originado do seccionamento do circuito LT 230 kV LONDRINA ESU /ASSIS C-1 PR/SP na SE LONDRINA COT. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | LONDRINA COT | EL 230 kV LONDRINA COT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR | RB | FT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR | 057/2001 | IPCA | RBNI | REA 7576/2019 | 12/14/2020 | 12/16/2048 | R$ 1,690,901.39 | 6/1/2025 | Ativa | T2018-096 | Instalar, na SE LONDRINA COT, um módulo de entrada de linha para o circuito LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR originado do seccionamento do circuito LT 230 kV LONDRINA ESU /ASSIS C-1 PR/SP na SE LONDRINA COT. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | LONDRINA ESU | TR 500/230 kV LONDRINA ESU TRR1 PR | RB | FT TR 500/230 kV LONDRINA ESU TRR1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$558,003.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LONDRINA ESU | TR 500/230 kV LONDRINA ESU TR4 PR | RB | FT TR 500/230 kV LONDRINA ESU TR4 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,674,009.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LONDRINA ESU | TR 500/230 kV LONDRINA ESU TR3 PR | RB | FT TR 500/230 kV LONDRINA ESU TR3 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,674,009.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LONDRINA ESU | TR 500/230 kV LONDRINA ESU TR3 PR | RB | FT TR 500/230 kV LONDRINA ESU TR3 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,938,023.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LONDRINA ESU | TR 500/230 kV LONDRINA ESU TR3 PR | RB | FT TR 500/230 kV LONDRINA ESU TR3 PR | 057/2001 | IPCA | RMELP | REA 13930/2023 | R$ 8,299,577.98 | 6/1/2025 | Prevista | T2023-029 | Obra de Substituição Completa - Substituição de banco de autotransformadores monofásicos com comutador sob carga, TF3, 525/230 kV, 3x224 MVA. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 1436/2022, 1438/2022 e 1439/2022. | ||||
| AXIA Energia Sul | LONDRINA ESU | RTB 500 kV 50 Mvar LONDRINA ESU RBR PR | RB | FT RTB 500 kV 50 Mvar LONDRINA ESU RBR PR | 057/2001 | IPCA | RBNI | REA 7152/2018 | 6/27/2020 | 4/20/2056 | R$752,317.86 | 6/1/2025 | Ativa | T2018-020 | Instalação, na Subestação Londrina, de uma fase reserva de Reator de Barra 500 kV - 50 Mvar *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | LONDRINA ESU | RTB 500 kV 150 Mvar LONDRINA ESU RB2 PR | RB | FT RTB 500 kV 150 Mvar LONDRINA ESU RB2 PR | 057/2001 | IPCA | RBNI | REA 7152/2018 | 6/28/2020 | 1/3/2055 | R$ 2,454,365.96 | 6/1/2025 | Ativa | T2018-020 | Instalação, na Subestação Londrina, de um Banco de Reatores de Barra monofásicos RB2 500 kV - 150 Mvar *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | LONDRINA ESU | RTB 500 kV 150 Mvar LONDRINA ESU RB1 PR | RB | FT RTB 500 kV 150 Mvar LONDRINA ESU RB1 PR | 057/2001 | IPCA | RBNI | REA 7152/2018 | 6/27/2020 | 1/2/2055 | R$ 2,454,218.34 | 6/1/2025 | Ativa | T2018-020 | Instalação, na Subestação Londrina, de um Banco de Reatores de Barra monofásicos RB1 500 kV - 150 Mvar *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | LONDRINA ESU | MG 500 kV LONDRINA ESU MG1 PR | RB | FT MG 500 kV LONDRINA ESU MG1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,044,346.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LONDRINA ESU | MG 500 kV LONDRINA ESU MG1 PR | RB | FT MG 500 kV LONDRINA ESU MG1 PR | 057/2001 | IPCA | RBNI | REA 7152/2018 | 6/27/2020 | 1/16/2050 | R$110,680.00 | 6/1/2025 | Ativa | T2018-020 | Complementação do Módulo Geral 500 kV da Subestação Londrina com a instalação de um Painel de SA 125 Vcc e 4 postes de concreto para sistema de proteção contra descarga atmosférica *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | LONDRINA ESU | MG 500 kV LONDRINA ESU MG1 PR | RB | FT MG 500 kV LONDRINA ESU MG1 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2020 | 3/25/2037 | R$316,721.21 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | LONDRINA ESU | MC 525 kV RTB 500 kV 150 Mvar LONDRINA ESU RB2 PR | RB | FT RTB 500 kV 150 Mvar LONDRINA ESU RB2 PR | 057/2001 | IPCA | RBNI | REA 7152/2018 | 6/28/2020 | 4/15/2049 | R$ 1,916,369.15 | 6/1/2025 | Ativa | T2018-020 | Instalação, na Subestação Londrina, de uma conexão em 500 kV na configuração DJM para o reator de barras RB2 *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | LONDRINA ESU | MC 525 kV RTB 500 kV 150 Mvar LONDRINA ESU RB1 PR | RB | FT RTB 500 kV 150 Mvar LONDRINA ESU RB1 PR | 057/2001 | IPCA | RBNI | REA 7152/2018 | 6/27/2020 | 4/14/2049 | R$ 1,916,230.28 | 6/1/2025 | Ativa | T2018-020 | Instalação, na Subestação Londrina, de uma conexão em 500 kV na configuração DJM para o reator de barras RB1 *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | LONDRINA ESU | MC 500 kV TR 500/230 kV LONDRINA ESU TR4 PR | RB | FT TR 500/230 kV LONDRINA ESU TR4 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$358,630.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LONDRINA ESU | MC 500 kV TR 500/230 kV LONDRINA ESU TR4 PR | RB | FT TR 500/230 kV LONDRINA ESU TR4 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/26/2023 | 1/31/2053 | R$61,023.30 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | LONDRINA ESU | MC 500 kV TR 500/230 kV LONDRINA ESU TR4 PR | RB | FT TR 500/230 kV LONDRINA ESU TR4 PR | 057/2001 | IPCA | RBNI | DSP 1233/2022 | 1/26/2023 | 1/31/2053 | R$42,427.03 | 6/1/2025 | Ativa | Substituição de Transformador de Corrente 525 kV referente ao TF 4 525/230 kV da SE Londrina ESUL, DJ1072, Fase C. Associado à obra, são esperadas substituições/adaptações de fundações e suportes, caixa de junção, cabos de controle/potência, barramento, conectores e conexão de aterramento.. Riscos de danos às instalações devido à perda de confiabilidade. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | LONDRINA ESU | MC 500 kV TR 500/230 kV LONDRINA ESU TR3 PR | RB | FT TR 500/230 kV LONDRINA ESU TR3 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$358,630.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LONDRINA ESU | MC 500 kV TR 500/230 kV LONDRINA ESU TR3 PR | RB | FT TR 500/230 kV LONDRINA ESU TR3 PR | 057/2001 | IPCA | RMEL | REN 643/2014 | 4/26/2015 | 4/25/2039 | R$38,593.12 | 6/1/2025 | Ativa | Substituição pararaios 525kV do TF3. [MC 500 kV TR 500/230 kV LONDRINA ESU TR3 PR] Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | LONDRINA ESU | MC 500 kV TR 500/230 kV LONDRINA ESU TR3 PR | RB | FT TR 500/230 kV LONDRINA ESU TR3 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$629,425.18 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LONDRINA ESU | MC 500 kV TR 500/230 kV LONDRINA ESU TR3 PR | RB | FT TR 500/230 kV LONDRINA ESU TR3 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/26/2023 | 1/31/2053 | R$127,137.07 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | LONDRINA ESU | MC 230 kV TR 500/230 kV LONDRINA ESU TR4 PR | RB | FT TR 500/230 kV LONDRINA ESU TR4 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LONDRINA ESU | MC 230 kV TR 500/230 kV LONDRINA ESU TR3 PR | RB | FT TR 500/230 kV LONDRINA ESU TR3 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LONDRINA ESU | IB 500 kV MG 500 kV LONDRINA ESU MG1 PR IB2 | RB | FT MG 500 kV LONDRINA ESU MG1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LONDRINA ESU | IB 500 kV MG 500 kV LONDRINA ESU MG1 PR IB2 | RB | FT MG 500 kV LONDRINA ESU MG1 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/20/2023 | 1/22/2053 | R$78,518.17 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | LONDRINA ESU | IB 500 kV MG 500 kV LONDRINA ESU MG1 PR IB1 | RB | FT MG 500 kV LONDRINA ESU MG1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LONDRINA ESU | IB 500 kV MG 500 kV LONDRINA ESU MG1 PR IB1 | RB | FT MG 500 kV LONDRINA ESU MG1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$667,954.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LONDRINA ESU | IB 230 kV MG 500 kV LONDRINA ESU MG1 PR IB1 | RB | FT MG 500 kV LONDRINA ESU MG1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,146.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LONDRINA ESU | IB 230 kV MG 500 kV LONDRINA ESU MG1 PR IB1 | RB | FT MG 500 kV LONDRINA ESU MG1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,091.00 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LONDRINA ESU | EL 500 kV LONDRINA ESU LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR | RB | FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LONDRINA ESU | EL 500 kV LONDRINA ESU LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR | RB | FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR | 057/2001 | IPCA | RMEL | REN 643/2014 | 8/2/2014 | 8/1/2038 | R$37,385.45 | 6/1/2025 | Ativa | Substituição dos para-raios 525 kV de SiC por ZnO do circuito Ivaiporã 1. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | LONDRINA ESU | EL 500 kV LONDRINA ESU LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR | RB | FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$713,154.95 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LONDRINA ESU | EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /SARANDI C-1 PR | RB | FT LT 230 kV LONDRINA ESU /SARANDI C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LONDRINA ESU | EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /SARANDI C-1 PR | RB | FT LT 230 kV LONDRINA ESU /SARANDI C-1 PR | 057/2001 | IPCA | RBNI | REA 8795/2020 | 3/31/2023 | 3/31/2051 | R$89,819.05 | 6/1/2025 | Ativa | T2020-024 | Adequação das proteções, na SE LONDRINA ESU, na entrada de linha, em 230 kV, para a LT 230 kV LONDRINA ESU /MARINGA C-1 PR, arranjo BD4, em função do seccionamento da LT 230 kV LONDRINA ESU /MARINGA C-1 PR na SE Sarandi. | ||
| AXIA Energia Sul | LONDRINA ESU | EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /SARANDI C-1 PR | RB | FT LT 230 kV LONDRINA ESU /SARANDI C-1 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 5/31/2014 | 5/30/2038 | R$9,700.33 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | LONDRINA ESU | EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR | RB | FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LONDRINA ESU | EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR | RB | FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$331,586.21 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LONDRINA ESU | EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR | RB | FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR | 057/2001 | IPCA | RBNI | REA 7761/2019 | 8/13/2021 | 8/16/2051 | R$68,324.69 | 6/1/2025 | Ativa | Substituição de 3 Transformador de Corrente(s) no vão Apu(APA 1) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | LONDRINA ESU | EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR | RB | FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/30/2023 | 2/13/2053 | R$46,468.58 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | LONDRINA ESU | EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR | RB | FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR | 057/2001 | IPCA | RBNI | DSP 1233/2022 | 1/31/2023 | 2/2/2053 | R$22,821.02 | 6/1/2025 | Ativa | Instalação de Transformador de Potencial Capacitivo (TPC) em substituição ao Transformador de Potencial (TP), instalado na fase A, da Barra PT de 230 kV (BAPT-230). Especificações: medição e proteção.. Riscos de danos às instalações devido à perda de confiabilidade. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | LONDRINA ESU | EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR | RB | FT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LONDRINA ESU | EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR | RB | FT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR | 057/2001 | IPCA | RBNI | REA 7576/2019 | 12/14/2020 | 12/13/2035 | R$102,499.48 | 6/1/2025 | Ativa | T2018-096 | Adequação, na Subestação Londrina ESUL, da Entrada de Linha 230 kV para a Subestação Londrina COPEL em função do seccionamento da LT 230 kV Assis - Londrina ESUL na Subestação Londrina COPEL. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | LONDRINA ESU | EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR | RB | FT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 6/30/2014 | 6/29/2038 | R$9,824.45 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | LONDRINA ESU | EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR | RB | FT LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LONDRINA ESU | EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR | RB | FT LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$331,586.21 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LONDRINA ESU | EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR | RB | FT LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR | 057/2001 | IPCA | RBNI | REA 7761/2019 | 8/17/2021 | 8/20/2051 | R$68,345.61 | 6/1/2025 | Ativa | Substituição de 3 Transformador de Corrente(s) no vão Londrina Copel(LNA) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | LONDRINA SUL | MG 230 kV LONDRINA SUL MG2 PR | RB | FT MG 230 kV LONDRINA SUL MG2 PR | 057/2001 | IPCA | RBNI | DSP 1302/2022 | 3/30/2022 | 12/31/2042 | R$18,341.18 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 2 Módulos de Infraestrutura de Manobra 230 kV na SE Londrina Sul, associados as Entradas de Linha 230kV para as SE´sLondrina (ESUL) e Apucarana, em função do seccionamento da LT 230 kV Londrina (ESUL) - Apucarana C1 na SE Londrina Sul. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | LONDRINA SUL | EL 230 kV LONDRINA SUL LT 230 kV LONDRINA SUL /APUCARANA C-1 PR | RB | FT LT 230 kV LONDRINA SUL /APUCARANA C-1 PR | 057/2001 | IPCA | RBNI | DSP 1302/2022 | 3/30/2022 | 12/31/2042 | R$92,819.88 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Londrina Sul, associada à Linha de Transmissão 230 kV Londrina Sul C1-Apucarana C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | LONDRINA SUL | EL 230 kV LONDRINA SUL LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR | RB | FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR | 057/2001 | IPCA | RBNI | DSP 1302/2022 | 3/30/2022 | 12/31/2042 | R$92,819.88 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Londrina Sul, associada à Linha de Transmissão 230 kV Londrina (ESUL) – Londrina Sul C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 138 kV ACU II /SAN.MATOS II RN | LT 138 kV ACU II /SAN.MATOS II C-1 RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$623,508.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV ADRIANOPOLIS /CEPEL RJ | LT 138 kV ADRIANOPOLIS /CEPEL C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$18,494.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV ADRIANOPOLIS /CEPEL RJ | LT 138 kV ADRIANOPOLIS /CEPEL C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$70,971.15 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV ADRIANOPOLIS /CEPEL RJ | LT 138 kV ADRIANOPOLIS /CEPEL C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$18,494.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV ADRIANOPOLIS /CEPEL RJ | LT 138 kV ADRIANOPOLIS /CEPEL C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$70,971.15 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV ALCANTARA /ADRIANOPOLIS RJ | LT 138 kV ALCANTARA /ADRIANOPOLIS C-3 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$307,994.91 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV ALCANTARA /ADRIANOPOLIS RJ | LT 138 kV ALCANTARA /ADRIANOPOLIS C-3 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,181,892.65 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV ALCANTARA /ADRIANOPOLIS RJ | LT 138 kV ALCANTARA /ADRIANOPOLIS C-3 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,267,052.19 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV ALCANTARA /ADRIANOPOLIS RJ | LT 138 kV ALCANTARA /ADRIANOPOLIS C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$208,658.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV ALCANTARA /ADRIANOPOLIS RJ | LT 138 kV ALCANTARA /ADRIANOPOLIS C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$800,700.11 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV ALCANTARA /ADRIANOPOLIS RJ | LT 138 kV ALCANTARA /ADRIANOPOLIS C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$858,393.38 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV ALCANTARA /ADRIANOPOLIS RJ | LT 138 kV ALCANTARA /ADRIANOPOLIS C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$203,441.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV ALCANTARA /ADRIANOPOLIS RJ | LT 138 kV ALCANTARA /ADRIANOPOLIS C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$780,682.60 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 138 kV ANASTACIO /AQUIDAUANA MS | LT 138 kV ANASTACIO /AQUIDAUANA C-2 MS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$114,526.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 138 kV ANASTACIO /AQUIDAUANA MS | LT 138 kV ANASTACIO /AQUIDAUANA C-2 MS | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/26/2022 | 1/29/2052 | R$8,696.76 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | LT 138 kV ANASTACIO /AQUIDAUANA MS | LT 138 kV ANASTACIO /AQUIDAUANA C-1 MS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$114,526.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 138 kV ANASTACIO /AQUIDAUANA MS | LT 138 kV ANASTACIO /AQUIDAUANA C-1 MS | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$201,002.78 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 138 kV ANASTACIO /AQUIDAUANA MS | LT 138 kV ANASTACIO /AQUIDAUANA C-1 MS | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$170,252.86 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV ANGRA AMPLA /MURIQUI RJ | LT 138 kV ANGRA AMPLA /MURIQUI C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$443,909.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV ANGRA FUR /ANGRA AMPLA RJ | LT 138 kV ANGRA FUR /ANGRA AMPLA C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$523,591.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV ANGRA FUR /ANGRA AMPLA RJ | LT 138 kV ANGRA FUR /ANGRA AMPLA C-1 RJ | DIT | 062/2001 | IPCA | RCDM | REA 5544/2015 | 12/19/2024 | 12/18/2052 | R$ 3,776,405.83 | 6/1/2025 | Ativa | T2015-048 | Reconstruir 28 km de circuito simples com 56 estruturas autoportantes, 1 cabo RAIL por fase e 2 cabos para-raios de aço 3/8 por fase. | |||
| AXIA Energia | LT 138 kV ANGRA FUR /ANGRA AMPLA RJ | LT 138 kV ANGRA FUR /ANGRA AMPLA C-1 RJ | DIT | 062/2001 | IPCA | RCDM | REA 5544/2015 | 12/19/2024 | 12/18/2052 | R$764,531.37 | 6/1/2025 | Ativa | T2015-048 | Recapacitar 6 km de circuito simples, com a substituição de cabo 397 MCM por cabo HTLS 467,1 MCM. | |||
| AXIA Energia | LT 138 kV ANGRA FUR /JACUACANGA RJ | LT 138 kV ANGRA FUR /JACUACANGA C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$523,591.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV ANGRA FUR /JACUACANGA RJ | LT 138 kV ANGRA FUR /JACUACANGA C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,009,217.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV ANGRA FUR /SANTA CRUZ RJ | LT 138 kV ANGRA FUR /SANTA CRUZ C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,478,375.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV ANGRA FUR /SANTA CRUZ RJ | LT 138 kV ANGRA FUR /SANTA CRUZ C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 5,673,084.73 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | LT 138 kV C. MAGALHAES /PETROVINA MT | LT 138 kV C. MAGALHAES /PETROVINA C-1 MT | DIT | 058/2001 | IPCA | RCDMA | REA 10495/2021 | R$23,600.24 | 6/1/2025 | Prevista | T2021-072 | Instalação de trecho de linha de transmissão em 138 kV, circuito duplo, entre o ponto de seccionamento da linha de transmissão 138 kV Rondonópolis -Couto Magalhães e a subestação seccionadora Petrovina, com 0,30 km de extensão. | |||||
| AXIA Energia Norte | LT 138 kV C. MAGALHAES /RONDONOPOLIS MT | LT 138 kV C. MAGALHAES /RONDONOPOLIS C-1 MT | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,666,892.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV C. PAULISTA /VOLTA REDONDA SP/RJ | LT 138 kV C. PAULISTA /VOLTA REDONDA C-2 SP/RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,259,742.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV C. PAULISTA /VOLTA REDONDA SP/RJ | LT 138 kV C. PAULISTA /VOLTA REDONDA C-2 SP/RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,834,108.36 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV C. PAULISTA /VOLTA REDONDA SP/RJ | LT 138 kV C. PAULISTA /VOLTA REDONDA C-2 SP/RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 5,182,422.94 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV C. PAULISTA /VOLTA REDONDA SP/RJ | LT 138 kV C. PAULISTA /VOLTA REDONDA C-1 SP/RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,616,973.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV C. PAULISTA /VOLTA REDONDA SP/RJ | LT 138 kV C. PAULISTA /VOLTA REDONDA C-1 SP/RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,204,936.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV C. PAULISTA /VOLTA REDONDA SP/RJ | LT 138 kV C. PAULISTA /VOLTA REDONDA C-1 SP/RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 6,652,024.01 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 138 kV C.GRANDE II /PILOES PB | LT 138 kV C.GRANDE II /PILOES C-1 PB | DIT | 061/2001 | IPCA | RCDM | REA 1094/2007 | 11/9/2012 | 9/26/2053 | R$ 2,325,431.71 | 6/1/2025 | Ativa | T2000-162 | Instalar o circuito C1 da LT 138 kV C.GRANDE II /PILOES PB originado do seccionamento do circuito LT 138 kV C.GRANDE II /SANTA CRUZ II C-2 PB/RN na SE PILOES *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 138 kV C.GRANDE II /PILOES PB | LT 138 kV C.GRANDE II /PILOES C-1 PB | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$582,839.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 138 kV C.GRANDE II /SANTA CRUZ II PB/RN | LT 138 kV C.GRANDE II /SANTA CRUZ II C-1 PB/RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,165,678.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 138 kV CAMPO GRANDE /MIMOSO 2 MS | LT 138 kV CAMPO GRANDE /MIMOSO 2 C-2 MS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$750,610.52 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 138 kV CAMPO GRANDE /MIMOSO 2 MS | LT 138 kV CAMPO GRANDE /MIMOSO 2 C-2 MS | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,317,383.10 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 138 kV CAMPO GRANDE /MIMOSO 2 MS | LT 138 kV CAMPO GRANDE /MIMOSO 2 C-1 MS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,218,752.39 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 138 kV CAMPO GRANDE /MIMOSO 2 MS | LT 138 kV CAMPO GRANDE /MIMOSO 2 C-1 MS | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,139,010.52 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 138 kV CAMPO GRANDE /U.MIMOSO MS | LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$931,169.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 138 kV CAMPO GRANDE /U.MIMOSO MS | LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,634,279.38 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 138 kV CAMPO GRANDE /U.MIMOSO MS | LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,384,263.14 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV CAMPOS /IRIRI RJ | LT 138 kV CAMPOS /IRIRI C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,493,775.32 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV CAMPOS /IRIRI RJ | LT 138 kV CAMPOS /IRIRI C-1 RJ | DIT | 062/2001 | IPCA | RCDMA | REA 10203/2021 | R$15,720.61 | 6/1/2025 | Prevista | T2019-066 | Instalar o circuito LT 138 kV CAMPOS /IRIRI C-1 RJ originado do seccionamento do circuito LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ na SE IRIRI | |||||
| AXIA Energia | LT 138 kV CAMPOS /ROCHA LEAO RJ | LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,693,972.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 138 kV ELDORADO /GUAIRA MS/PR | LT 138 kV ELDORADO /GUAIRA C-1 MS/PR | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$235,932.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 138 kV ELDORADO /GUAIRA MS/PR | LT 138 kV ELDORADO /GUAIRA C-1 MS/PR | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$414,081.07 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV IMBARIE /SAO JOSE RJ | LT 138 kV IMBARIE /SAO JOSE C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$237,551.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV IMBARIE /SAO JOSE RJ | LT 138 kV IMBARIE /SAO JOSE C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$911,574.72 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV IMBARIE /SAO JOSE RJ | LT 138 kV IMBARIE /SAO JOSE C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$977,256.90 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV IMBARIE /SAO JOSE RJ | LT 138 kV IMBARIE /SAO JOSE C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$237,551.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV IMBARIE /SAO JOSE RJ | LT 138 kV IMBARIE /SAO JOSE C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$911,574.72 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV IMBARIE /SAO JOSE RJ | LT 138 kV IMBARIE /SAO JOSE C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$977,256.90 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV IRIRI /ROCHA LEAO RJ | LT 138 kV IRIRI /ROCHA LEAO C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$200,196.69 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV IRIRI /ROCHA LEAO RJ | LT 138 kV IRIRI /ROCHA LEAO C-1 RJ | DIT | 062/2001 | IPCA | RCDMA | REA 10203/2021 | R$15,720.61 | 6/1/2025 | Prevista | T2019-066 | Instalar o circuito LT 138 kV IRIRI /ROCHA LEAO C-1 RJ originado do seccionamento do circuito LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ na SE IRIRI | |||||
| AXIA Energia | LT 138 kV JACUACANGA /BRISAMAR RJ | LT 138 kV JACUACANGA /BRISAMAR C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$677,588.80 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV JACUACANGA /BRISAMAR RJ | LT 138 kV JACUACANGA /BRISAMAR C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,600,163.84 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 138 kV JUPIA /U.MIMOSO SP/MS | LT 138 kV JUPIA /U.MIMOSO C-3 SP/MS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,880,395.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 138 kV JUPIA /U.MIMOSO SP/MS | LT 138 kV JUPIA /U.MIMOSO C-3 SP/MS | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,300,248.38 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 138 kV JUPIA /U.MIMOSO SP/MS | LT 138 kV JUPIA /U.MIMOSO C-2 SP/MS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,880,395.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 138 kV JUPIA /U.MIMOSO SP/MS | LT 138 kV JUPIA /U.MIMOSO C-2 SP/MS | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,300,248.38 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 138 kV JUPIA /U.MIMOSO SP/MS | LT 138 kV JUPIA /U.MIMOSO C-1 SP/MS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,053,163.19 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 138 kV JUPIA /U.MIMOSO SP/MS | LT 138 kV JUPIA /U.MIMOSO C-1 SP/MS | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 5,358,552.12 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 138 kV MIMOSO 2 /U.MIMOSO MS | LT 138 kV MIMOSO 2 /U.MIMOSO C-2 MS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$180,559.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 138 kV MIMOSO 2 /U.MIMOSO MS | LT 138 kV MIMOSO 2 /U.MIMOSO C-2 MS | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$316,896.28 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 138 kV MIMOSO 2 /U.MIMOSO MS | LT 138 kV MIMOSO 2 /U.MIMOSO C-1 MS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$293,170.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 138 kV MIMOSO 2 /U.MIMOSO MS | LT 138 kV MIMOSO 2 /U.MIMOSO C-1 MS | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$514,538.61 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV MURIQUI /BRISAMAR RJ | LT 138 kV MURIQUI /BRISAMAR C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$263,946.11 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 138 kV PARAISO /SANTA CRUZ II RN | LT 138 kV PARAISO /SANTA CRUZ II C-1 RN | DIT | 061/2001 | IPCA | RCDM | REA 2173/2009 | 3/30/2014 | 9/12/2052 | R$340,058.67 | 6/1/2025 | Ativa | T2009-047 | Instalar o circuito LT 138 kV PARAISO /SANTA CRUZ II C-1 RN originado do seccionamento do circuito LT 138 kV PILOES /SANTA CRUZ II C-1 RN na SE PARAISO. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 138 kV PARAISO /SANTA CRUZ II RN | LT 138 kV PARAISO /SANTA CRUZ II C-1 RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,896.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV PARQUE EMAS /C. MAGALHAES GO/MT | LT 138 kV PARQUE EMAS /C. MAGALHAES C-1 GO/MT | DIT | 062/2001 | IPCA | RCDM | REA 2367/2010 | 11/17/2013 | 12/8/2046 | R$17,095.93 | 6/1/2025 | Ativa | T2009-055 | Instalar o circuito LT 138 kV PARQUE DAS EMAS/ COUTO MAGALHÃES C-1 GO originado do seccionamento do circuito LT 138 kV RIO CLARO /C. MAGALHAES C-1 GO/MT na SE PARQUE DAS EMAS.(O circuito será seccionado a 87,5 km da SE Rio Claro e a 81,6 km da SE Couto Magalhães e o seccionamento terá 0,3 km de extensão) *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | LT 138 kV PARQUE EMAS /C. MAGALHAES GO/MT | LT 138 kV PARQUE EMAS /C. MAGALHAES C-1 GO/MT | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$978,421.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV PARQUE EMAS /C. MAGALHAES GO/MT | LT 138 kV PARQUE EMAS /C. MAGALHAES C-1 GO/MT | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,754,571.14 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | LT 138 kV PETROVINA /RONDONOPOLIS MT | LT 138 kV PETROVINA /RONDONOPOLIS C-1 MT | DIT | 058/2001 | IPCA | RCDMA | REA 10495/2021 | R$23,600.24 | 6/1/2025 | Prevista | T2021-072 | Instalar o circuito LT 138 kV PETROVINA /RONDONOPOLIS C-1 MT, originado do seccionamento do circuito LT 138 kV C. MAGALHAES /RONDONOPOLIS C-1 MT na SE PETROVINA, com a instalação de trecho de linha de transmissão em 138 kV, circuito duplo, entre o ponto de seccionamento da linha de transmissão e a subestação seccionadora, com 0,30 km de extensão. | |||||
| AXIA Energia Nordeste | LT 138 kV PILOES /PARAISO PB/RN | LT 138 kV PILOES /PARAISO C-1 PB/RN | DIT | 061/2001 | IPCA | RCDM | REA 2173/2009 | 3/30/2014 | 10/4/2052 | R$343,354.06 | 6/1/2025 | Ativa | T2009-047 | Instalar o circuito LT 138 kV PILOES /PARAISO C-1 RN originado do seccionamento do circuito LT 138 kV PILOES /SANTA CRUZ II C-1 RN na SE PARAISO. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 138 kV PILOES /PARAISO PB/RN | LT 138 kV PILOES /PARAISO C-1 PB/RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$555,943.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 138 kV PILOES /PARAISO PB/RN | LT 138 kV PILOES /PARAISO C-1 PB/RN | DIT | 061/2001 | IPCA | RCDM | REA 1094/2007 | 11/9/2012 | 11/8/2052 | R$ 2,315,789.72 | 6/1/2025 | Ativa | T2009-047 | Receita resultante do seccionamento do circuito LT 138 kV PILOES /SANTA CRUZ II C-1 PB/RN na SE PARAISO . Instalar o circuito C1 da LT 138 kV PILOES /SANTA CRUZ II PB/RN originado do seccionamento do circuito LT 138 kV C.GRANDE II /SANTA CRUZ II C-2 PB/RN na SE PILOES *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 138 kV PILOES /PARAISO PB/RN | LT 138 kV PILOES /PARAISO C-1 PB/RN | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/31/2020 | 1/30/2053 | R$198,318.92 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | LT 138 kV PRATA /COXIPO MT | LT 138 kV PRATA /COXIPO C-1 MT | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,838,957.20 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | LT 138 kV PRATA /COXIPO MT | LT 138 kV PRATA /COXIPO C-1 MT | DIT | 058/2001 | IPCA | RCDM | DSP 555/2023 | 1/27/2021 | 12/31/2042 | R$6,054.66 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 138 kV, circuito duplo, Coxipó -Prata C1, originado do seccionamento da Linha de Transmissão 138 kV Coxipó - Rondonópolis C1 na Subestação seccionadora Prata, com 0,76 km de extensão. *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | LT 138 kV RIO CLARO /PARQUE EMAS GO | LT 138 kV RIO CLARO /PARQUE EMAS C-1 GO | DIT | 062/2001 | IPCA | RCDM | REA 2367/2010 | 11/17/2013 | 12/8/2046 | R$17,095.93 | 6/1/2025 | Ativa | T2009-054 | Instalar o circuito LT 138 kV RIO CLARO /C. MAGALHAES C-1 GO/MT originado do seccionamento do circuito LT 138 kV RIO VERDE FUR /C. MAGALHAES C-1 GO/MT na SE RIO CLARO *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | LT 138 kV RIO CLARO /PARQUE EMAS GO | LT 138 kV RIO CLARO /PARQUE EMAS C-1 GO | DIT | 062/2001 | IPCA | RCDM | REA 2367/2010 | 11/17/2013 | 12/8/2046 | R$17,095.93 | 6/1/2025 | Ativa | T2009-055 | Instalar o circuito LT 138 kV RIO CLARO / PARQUE DAS EMAS C-1 GO originado do seccionamento do circuito LT 138 kV RIO CLARO /C. MAGALHAES C-1 GO/MT na SE PARQUE DAS EMAS.(O circuito será seccionado a 87,5 km da SE Rio Claro e a 81,6 km da SE Couto Magalhães e o seccionamento terá 0,3 km de extensão) *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | LT 138 kV RIO CLARO /PARQUE EMAS GO | LT 138 kV RIO CLARO /PARQUE EMAS C-1 GO | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,049,164.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV RIO CLARO /PARQUE EMAS GO | LT 138 kV RIO CLARO /PARQUE EMAS C-1 GO | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,026,041.36 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV RIO VERDE FUR /RIO CLARO GO | LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO | DIT | 062/2001 | IPCA | RCDM | REA 2367/2010 | 11/17/2013 | 12/8/2046 | R$17,095.93 | 6/1/2025 | Ativa | T2009-054 | Instalar o circuito LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO originado do seccionamento do circuito LT 138 kV RIO VERDE FUR /C. MAGALHAES C-1 GO/MT na SE RIO CLARO *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | LT 138 kV RIO VERDE FUR /RIO CLARO GO | LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,019,791.80 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV RIO VERDE FUR /RIO CLARO GO | LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,913,325.81 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV RIO VERDE FUR /RIO CLARO GO | LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/15/2016 | 8/5/2048 | R$40,549.15 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | LT 138 kV RONDONOPOLIS /PRATA MT | LT 138 kV RONDONOPOLIS /PRATA C-1 MT | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$977,760.69 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | LT 138 kV RONDONOPOLIS /PRATA MT | LT 138 kV RONDONOPOLIS /PRATA C-1 MT | DIT | 058/2001 | IPCA | RCDM | DSP 555/2023 | 1/27/2021 | 12/31/2042 | R$6,054.66 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 138 kV, circuito duplo, Prata-Rondonópolis C1, originado do seccionamento da Linha de Transmissão 138 kV Coxipó - Rondonópolis C1 na Subestação seccionadora Prata, com 0,76 km de extensão. *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | LT 138 kV SANTA CRUZ /BRISAMAR RJ | LT 138 kV SANTA CRUZ /BRISAMAR C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$307,994.91 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV SANTA CRUZ /BRISAMAR RJ | LT 138 kV SANTA CRUZ /BRISAMAR C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,181,892.65 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV SAO JOSE /MAGE RJ | LT 138 kV SAO JOSE /MAGE C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$436,285.26 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV SAO JOSE /MAGE RJ | LT 138 kV SAO JOSE /MAGE C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,674,191.13 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV SAO JOSE /MAGE RJ | LT 138 kV SAO JOSE /MAGE C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,794,822.52 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV SAO JOSE /MAGE RJ | LT 138 kV SAO JOSE /MAGE C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$436,285.26 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV SAO JOSE /MAGE RJ | LT 138 kV SAO JOSE /MAGE C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,674,191.13 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV SAO JOSE /MAGE RJ | LT 138 kV SAO JOSE /MAGE C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,794,822.52 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV USI CAMPOS /CAMPOS RJ | LT 138 kV USI CAMPOS /CAMPOS C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$12,329.80 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV USI CAMPOS /CAMPOS RJ | LT 138 kV USI CAMPOS /CAMPOS C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$47,314.10 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV USI CAMPOS /CAMPOS RJ | LT 138 kV USI CAMPOS /CAMPOS C-2 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$50,723.25 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV USI CAMPOS /CAMPOS RJ | LT 138 kV USI CAMPOS /CAMPOS C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$12,329.80 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 138 kV USI CAMPOS /CAMPOS RJ | LT 138 kV USI CAMPOS /CAMPOS C-1 RJ | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$47,314.10 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| Nova Era Integração | LT 230 kV ABAIARA /CRATO II CE | LT 230 kV ABAIARA /CRATO II C-1 CE | RB | FT LT 230 kV ABAIARA /CRATO II C-1 CE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,839,712.19 | 6/1/2025 | Prevista | T2024-197-C | LT 230 kV Abaiara - Milagres - C2Seccionamento da LT 230 kV Milagres – Crato II – C1 na subestação Abaiara. | ||||
| Nova Era Integração | LT 230 kV ABAIARA /MILAGRES CE | LT 230 kV ABAIARA /MILAGRES C-2 CE | RB | FT LT 230 kV ABAIARA /MILAGRES C-2 CE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 2,019,477.67 | 6/1/2025 | Prevista | T2024-197-C | LT 230 kV Abaiara - Milagres - C2Seccionamento da LT 230 kV Milagres – Crato II – C1 na subestação Abaiara. | ||||
| AXIA Energia Nordeste | LT 230 kV ABAIARA /MILAGRES CE | LT 230 kV ABAIARA /MILAGRES C-1 CE | RB | FT LT 230 kV ABAIARA /MILAGRES C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,324.86 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ABAIARA /MILAGRES CE | LT 230 kV ABAIARA /MILAGRES C-1 CE | RB | FT LT 230 kV ABAIARA /MILAGRES C-1 CE | 061/2001 | IPCA | RBNI | DSP 872/2024 | 12/7/2023 | 12/6/2057 | R$91,952.09 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Abaiara-Milagres C1, originado do seccionamento da Linha de Transmissão 230 kV Bom Nome - Milagres C2 na Subestação seccionadora Abaiara, com 6,7 km de extensão. | |||
| AXIA Energia Norte | LT 230 kV ABUNA /PORTO VELHO RO | LT 230 kV ABUNA /PORTO VELHO C-2 RO | RB | FT LT 230 kV ABUNA /PORTO VELHO C-2 RO | 022/2009 | IPCA | RBL | CC 022/2009 | 10/27/2011 | 11/19/2039 | R$ 16,493,578.93 | 6/1/2025 | Ativa | Contrato de Concessão nº 022/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no Ciclo 2020-2021. * Receita revisada em 11-06-2025 | |||
| AXIA Energia Norte | LT 230 kV ABUNA /PORTO VELHO RO | LT 230 kV ABUNA /PORTO VELHO C-1 RO | RB | FT LT 230 kV ABUNA /PORTO VELHO C-1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 4,089,931.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV ABUNA /RIO BRANCO 1 RO/AC | LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC | RB | FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 6,580,873.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV ABUNA /RIO BRANCO 1 RO/AC | LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC | RB | FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/23/2020 | 11/22/2048 | R$2,086.14 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | LT 230 kV ABUNA /TUCUMA RO/AC | LT 230 kV ABUNA /TUCUMA C-1 RO/AC | RB | FT LT 230 kV ABUNA /TUCUMA C-1 RO/AC | 022/2009 | IPCA | RBL | CC 022/2009 | 10/27/2011 | 11/19/2039 | R$ 20,969,636.12 | 6/1/2025 | Ativa | Contrato de Concessão nº 022/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no Ciclo 2020-2021. * Receita revisada em 11-06-2025 | |||
| AXIA Energia Norte | LT 230 kV ABUNA /TUCUMA RO/AC | LT 230 kV ABUNA /TUCUMA C-1 RO/AC | RB | FT LT 230 kV ABUNA /TUCUMA C-1 RO/AC | 022/2009 | IPCA | RBNI | DSP 516/2025 | 8/30/2024 | 11/19/2039 | R$631,828.48 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV Abunã -Tucumã C1, circuito duplo, para seccionamento da Linha de Transmissão 230 kV Abunã -Rio Branco 1 C2 na Subestação seccionadora Tucumã, com 30 km de extensão. *(Receita revisada em 11/06/2025) | |||
| AXIA Energia Nordeste | LT 230 kV ACU III /ACU II RN | LT 230 kV ACU III /ACU II C-3 RN | RB | FT LT 230 kV ACU III /ACU II C-3 RN | 019/2010 | IPCA | RBL | CC 019/2010 | 11/23/2010 | 11/23/2040 | R$ 1,652,216.25 | 6/1/2025 | Ativa | T2010-090-B | Rede Básica e ICGLT, C3, 230 kV Paraíso - Açu II; LT, C2, 230 kV Açu II - Mossoró II; (Rede Básica). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | LT 230 kV ACU III /ACU II RN | LT 230 kV ACU III /ACU II C-3 RN | RB | FT LT 230 kV ACU III /ACU II C-3 RN | 019/2010 | IPCA | RBNI | REA 4407/2013 | 5/27/2021 | 12/23/2058 | R$291,645.76 | 6/1/2025 | Ativa | T2018-026 | Receita resultante do seccionamento do circuito LT 230 kV MOSSORO II /ACU II C-2 RN na SE ACU III . Recapacitação de trecho de 12 km da linha de transmissão Mossoró II - Açu II C2, em 230 kV, entre a subestação Açu II e o seccionamento para a subestação Açu III. | ||
| AXIA Energia Nordeste | LT 230 kV ACU III /ACU II RN | LT 230 kV ACU III /ACU II C-3 RN | RB | FT LT 230 kV ACU III /ACU II C-3 RN | 019/2010 | IPCA | RBNI | DSP 1269/2022 | 1/31/2022 | 11/22/2040 | R$43,568.69 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Açu II – Açu III C2, originado do seccionamento da Linha de Transmissão 230 kV Açu II – Mossoró II C2, na SE Açu III, com 2,9 km de extensão. | |||
| AXIA Energia Nordeste | LT 230 kV ACU III /ACU II RN | LT 230 kV ACU III /ACU II C-1 RN | RB | FT LT 230 kV ACU III /ACU II C-1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$200,782.55 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ACU III /ACU II RN | LT 230 kV ACU III /ACU II C-1 RN | RB | FT LT 230 kV ACU III /ACU II C-1 RN | 061/2001 | IPCA | RBNI | REA 4407/2013 | 2/5/2020 | 7/4/2055 | R$455,530.94 | 6/1/2025 | Ativa | T2013-068 | Recapacitação de trecho de 12 km da linha de transmissão Açu II - Açu III, antiga Mossoró II - Açu II C1 seccionada na SE Açu III, em 230 kV, entre a subestação Açu II e o seccionamento para a subestação Açu III. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV ACU III /ACU II RN | LT 230 kV ACU III /ACU II C-1 RN | RB | FT LT 230 kV ACU III /ACU II C-1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$563,429.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ACU III /ACU II RN | LT 230 kV ACU III /ACU II C-1 RN | RB | FT LT 230 kV ACU III /ACU II C-1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$519,413.41 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ACU III /ACU II RN | LT 230 kV ACU III /ACU II C-1 RN | RB | FT LT 230 kV ACU III /ACU II C-1 RN | 061/2001 | IPCA | RBNI | DSP 1307/2022 | 3/18/2022 | 12/31/2042 | R$24,322.93 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Açu II – Açu III C1, originado do seccionamento da Linha de Transmissão 230 kV Açu II – Mossoró II C1, na SE Açu III, com 3,26 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | LT 230 kV AGUAS LINDAS /BRAS. SUL GO/DF | LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF | RB | FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF | 062/2001 | IPCA | RBNI | REA 2367/2010 | 11/24/2013 | 3/18/2040 | R$8,464.23 | 6/1/2025 | Ativa | T2009-133 | Instalar o circuito LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF originado do seccionamento do circuito LT 230 kV BARRO ALTO /BRAS. SUL C-1 GO/DF na SE AGUAS LINDAS *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | LT 230 kV AGUAS LINDAS /BRAS. SUL GO/DF | LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF | RB | FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$651,184.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV AGUAS LINDAS /BRAS. SUL GO/DF | LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF | RB | FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,498,841.24 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ALAGOINHAS II /CATU BA | LT 230 kV ALAGOINHAS II /CATU C-2 BA | RB | FT LT 230 kV ALAGOINHAS II /CATU C-2 BA | 061/2001 | IPCA | RBNIA | REA 12983/2022 | R$54,723.83 | 6/1/2025 | Prevista | T2022-113 | Instalar o circuito LT 230 kV ALAGOINHAS II /CATU C-1 BA originado do seccionamento do circuito LT 230 kV OLINDINA /CATU C-1 BA na SE ALAGOINHAS II | ||||
| AXIA Energia Nordeste | LT 230 kV ALAGOINHAS II /CATU BA | LT 230 kV ALAGOINHAS II /CATU C-1 BA | RB | FT LT 230 kV ALAGOINHAS II /CATU C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,055,021.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ALAGOINHAS II /CATU BA | LT 230 kV ALAGOINHAS II /CATU C-1 BA | RB | FT LT 230 kV ALAGOINHAS II /CATU C-1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 9/24/2017 | 2/3/2075 | R$15,491.96 | 6/1/2025 | Ativa | T2018-071 | Receita resultante do seccionamento do circuito LT 230 kV CIC. DANTAS /CATU C-2 BA na SE ALAGOINHAS II . SUBSTITUIÇÃO DA ESTRUTURA 534 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV ALAGOINHAS II /CATU BA | LT 230 kV ALAGOINHAS II /CATU C-1 BA | RB | FT LT 230 kV ALAGOINHAS II /CATU C-1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/24/2014 | 11/28/2051 | R$3,953.85 | 6/1/2025 | Ativa | T2018-071 | Receita resultante do seccionamento do circuito LT 230 kV CIC. DANTAS /CATU C-2 BA na SE ALAGOINHAS II . SUBSTITUIÇÃO DE CADEIAS DE ISOLADORES DE MESMO TIPO. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV ALAGOINHAS II /CATU BA | LT 230 kV ALAGOINHAS II /CATU C-1 BA | RB | FT LT 230 kV ALAGOINHAS II /CATU C-1 BA | 061/2001 | IPCA | RBNI | DSP 625/2024 | 5/19/2023 | 5/18/2057 | R$4,119.76 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Alagoinhas II-Catu C1, originado do seccionamento da Linha de Transmissão 230 kV Cícero Dantas - Catu C2 na Subestação seccionadora Alagoinhas II, com 0,3 km de extensão. | |||
| AXIA Energia Nordeste | LT 230 kV ALAGOINHAS II /CATU BA | LT 230 kV ALAGOINHAS II /CATU C-1 BA | RB | FT LT 230 kV ALAGOINHAS II /CATU C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/18/2022 | 11/22/2059 | R$167,781.85 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| Nova Era Ceará | LT 230 kV ALEX /MORADA NOVA CE | LT 230 kV ALEX /MORADA NOVA C-1 CE | RB | FT LT 230 kV ALEX /MORADA NOVA C-1 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 6,505,627.98 | 6/1/2025 | Prevista | T2024-195-G | - LT 230 kV Alex - Morada Nova, C1, CS; | ||||
| Nova Era Ceará | LT 230 kV ALEX /MOSSORO II CE/RN | LT 230 kV ALEX /MOSSORO II C-2 CE/RN | RB | FT LT 230 kV ALEX /MOSSORO II C-2 CE/RN | 006/2024 | IPCA | RBL | CC 006/2024 | R$496,845.51 | 6/1/2025 | Prevista | T2024-195-J | - Seccionamento da LT 230 kV Banabuiú – Mossoró II – C1 na subestação Alex | ||||
| AXIA Energia Nordeste | LT 230 kV ALEX /MOSSORO II CE/RN | LT 230 kV ALEX /MOSSORO II C-1 CE/RN | RB | FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,571,051.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ALEX /MOSSORO II CE/RN | LT 230 kV ALEX /MOSSORO II C-1 CE/RN | RB | FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,408,636.42 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ALEX /MOSSORO II CE/RN | LT 230 kV ALEX /MOSSORO II C-1 CE/RN | RB | FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 4,064,224.13 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ALEX /MOSSORO II CE/RN | LT 230 kV ALEX /MOSSORO II C-1 CE/RN | RB | FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN | 061/2001 | IPCA | RBNI | DSP 1183/2022 | 12/3/2021 | 12/31/2042 | R$26,040.32 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho com 3,6 km de extensão da Linha de Transmissão 230 kV Alex I-Mossoró II, circuito duplo, derivada do seccionamento da Linha de Transmissão 230 kV Banabuiú - Mossoró II C2 na Subestação seccionadora Alex I. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | LT 230 kV ALTAMIRA /TRANSAMAZONIC PA | LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA | RB | FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 4,067,088.88 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV ALTAMIRA /TRANSAMAZONIC PA | LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA | RB | FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA | 058/2001 | IPCA | RBNI | REA 4660/2014 | 6/21/2016 | 2/6/2045 | R$9,065.24 | 6/1/2025 | Ativa | T2014-017 | Instalar o circuito LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA originado do seccionamento do circuito LT 230 kV ALTAMIRA /RUROPOLIS C-1 PA na SE TRANSAMAZONIC. Eliminação do atendimento em TAP. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | LT 230 kV ALTAMIRA /TRANSAMAZONIC PA | LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA | RB | FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 8,829,339.79 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV ALTAMIRA /TRANSAMAZONIC PA | LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA | RB | FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 8,468,193.49 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV ANASTACIO /DOURADOS MS | LT 230 kV ANASTACIO /DOURADOS C-1 MS | RB | FT LT 230 kV ANASTACIO /DOURADOS C-1 MS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,330,654.25 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV ANASTACIO /DOURADOS MS | LT 230 kV ANASTACIO /DOURADOS C-1 MS | RB | FT LT 230 kV ANASTACIO /DOURADOS C-1 MS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 5,845,571.70 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV ANASTACIO /DOURADOS MS | LT 230 kV ANASTACIO /DOURADOS C-1 MS | RB | FT LT 230 kV ANASTACIO /DOURADOS C-1 MS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 4,951,301.19 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV ANASTACIO /DOURADOS MS | LT 230 kV ANASTACIO /DOURADOS C-1 MS | RB | FT LT 230 kV ANASTACIO /DOURADOS C-1 MS | 057/2001 | IPCA | RMEL | REN 905/2020 | 5/10/2021 | 5/14/2058 | R$81,058.86 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV ANGELIM /MESSIAS PE/AL | LT 230 kV ANGELIM /MESSIAS C-3 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,443,809.09 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ANGELIM /MESSIAS PE/AL | LT 230 kV ANGELIM /MESSIAS C-3 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,051,572.25 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ANGELIM /MESSIAS PE/AL | LT 230 kV ANGELIM /MESSIAS C-3 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 3,735,054.60 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ANGELIM /MESSIAS PE/AL | LT 230 kV ANGELIM /MESSIAS C-2 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,130,955.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ANGELIM /MESSIAS PE/AL | LT 230 kV ANGELIM /MESSIAS C-2 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,173,652.00 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ANGELIM /MESSIAS PE/AL | LT 230 kV ANGELIM /MESSIAS C-2 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL | 061/2001 | IPCA | RBNI | REA 7761/2019 | 12/6/2014 | 12/5/2047 | R$ 1,580,861.54 | 6/1/2025 | Ativa | Substituição dos 2 Cabos Para-raios. Dotterel e/ou EHS 3/8” (Cada Cabo Para Raios é composto por 66,63 km do Cabo tipo EHS 3/8 e 12,30 km do Cabo tipo Dotterel) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV ANGELIM /MESSIAS PE/AL | LT 230 kV ANGELIM /MESSIAS C-1 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,136,718.25 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ANGELIM /MESSIAS PE/AL | LT 230 kV ANGELIM /MESSIAS C-1 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,189,823.47 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ANGELIM /RECIFE II PE | LT 230 kV ANGELIM /RECIFE II C-1 PE | RB | FT LT 230 kV ANGELIM /RECIFE II C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,473,694.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ANGELIM /RECIFE II PE | LT 230 kV ANGELIM /RECIFE II C-1 PE | RB | FT LT 230 kV ANGELIM /RECIFE II C-1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/24/2022 | 9/28/2059 | R$674,769.59 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV ANGELIM /RIBEIRAO PE | LT 230 kV ANGELIM /RIBEIRAO C-2 PE | RB | FT LT 230 kV ANGELIM /RIBEIRAO C-2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,656,813.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ANGELIM /RIBEIRAO PE | LT 230 kV ANGELIM /RIBEIRAO C-2 PE | RB | FT LT 230 kV ANGELIM /RIBEIRAO C-2 PE | 061/2001 | IPCA | RBNI | REA 3817/2013 | 8/20/2019 | 7/29/2056 | R$51,937.87 | 6/1/2025 | Ativa | T2012-106 | Instalar o circuito LT 230 kV ANGELIM /RIBEIRAO C-2 PE originado do seccionamento do circuito LT 230 kV ANGELIM /RECIFE II C-2 PE na SE RIBEIRAO *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV ANGELIM /RIBEIRAO PE | LT 230 kV ANGELIM /RIBEIRAO C-1 PE | RB | FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE | 061/2001 | IPCA | RBNI | REA 2823/2011 | 1/21/2015 | 8/5/2051 | R$ 4,459,058.65 | 6/1/2025 | Ativa | T2010-050 | Recapacitação dos 115,5 km do primeiro circuito da Linha de Transmissão 230 kV Angelim - Ribeirão, circuito simples, com ampliação do limite de carregamento de curta duração de 437 A para 621 A, por meio de inclusão de estruturas e substituição do cabo condutor e dos cabos pararraios. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV ANGELIM /RIBEIRAO PE | LT 230 kV ANGELIM /RIBEIRAO C-1 PE | RB | FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,111,867.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ANGELIM /RIBEIRAO PE | LT 230 kV ANGELIM /RIBEIRAO C-1 PE | RB | FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE | 061/2001 | IPCA | RBNI | REA 7761/2019 | 12/20/2014 | 12/19/2047 | R$ 2,257,684.95 | 6/1/2025 | Ativa | Substituição de 2 Cabos Para-raios. Dotterel e/ou EHS 3/8” (Cada Cabo Para Raios é composto por 83,59 km do Cabo tipo EHS 3/8 e 32,15 km do Cabo tipo Dotterel) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV ANGELIM /TACAIMBO PE | LT 230 kV ANGELIM /TACAIMBO C-3 PE | RB | FT LT 230 kV ANGELIM /TACAIMBO C-3 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,199,219.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ANGELIM /TACAIMBO PE | LT 230 kV ANGELIM /TACAIMBO C-3 PE | RB | FT LT 230 kV ANGELIM /TACAIMBO C-3 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,365,212.35 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ANGELIM /TACAIMBO PE | LT 230 kV ANGELIM /TACAIMBO C-3 PE | RB | FT LT 230 kV ANGELIM /TACAIMBO C-3 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 3,102,314.63 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ANGELIM /TACAIMBO PE | LT 230 kV ANGELIM /TACAIMBO C-2 PE | RB | FT LT 230 kV ANGELIM /TACAIMBO C-2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,170,014.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ANGELIM /TACAIMBO PE | LT 230 kV ANGELIM /TACAIMBO C-2 PE | RB | FT LT 230 kV ANGELIM /TACAIMBO C-2 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/24/2022 | 9/23/2050 | R$217,917.31 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV ANGELIM /TACAIMBO PE | LT 230 kV ANGELIM /TACAIMBO C-1 PE | RB | FT LT 230 kV ANGELIM /TACAIMBO C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,166,364.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV AQUIRAZ II /FORTALEZA CE | LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE | 061/2001 | IPCA | RBNI | REA 3631/2012 | 8/27/2021 | 8/31/2058 | R$ 1,452,664.33 | 6/1/2025 | Ativa | T2012-075 | Instalar o circuito LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE originado do seccionamento do circuito LT 230 kV BANABUIU /FORTALEZA C-1 CE na SE AQUIRAZ II *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV AQUIRAZ II /FORTALEZA CE | LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE | 061/2001 | IPCA | RBNI | REA 3631/2012 | 8/27/2021 | 8/31/2058 | R$474,475.12 | 6/1/2025 | Ativa | T2012-075 | Recondutoramento de 10 km do trecho da Linha de Transmissão 230 kV Fortaleza I - Aquiraz II entre a subestação Fortaleza I e o ponto de seccionamento para a subestação Aquiraz II. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV AQUIRAZ II /FORTALEZA CE | LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$182,529.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV AQUIRAZ II /FORTALEZA CE | LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/21/2021 | 10/11/2050 | R$723,356.16 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV AQUIRAZ II /FORTALEZA CE | LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$186,233.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV AQUIRAZ II /FORTALEZA CE | LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$522,603.60 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV AQUIRAZ II /FORTALEZA CE | LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE | 061/2001 | IPCA | RBNI | REA 2823/2011 | 10/2/2020 | 6/24/2054 | R$ 5,367,309.88 | 6/1/2025 | Ativa | T2010-086 | Secionamento do segundo circuito da linha de transmissão 230 kV Banabuiu - Fortaleza I, na subestação Aquiraz II, com a construção de 20 km de linha de transmissão, com condutor CAL FLINT 740,80 MCM, resultando na LT 230 kV Aquiraz II - Fortaleza I, com 33,5 km de extensão. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV AQUIRAZ II /FORTALEZA CE | LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$192,851.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV AQUIRAZ II /FORTALEZA CE | LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$541,175.00 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV AQUIRAZ II /FORTALEZA CE | LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE | RB | FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/12/2022 | 6/22/2059 | R$270,482.15 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV ARAPIRACA III /PENEDO AL | LT 230 kV ARAPIRACA III /PENEDO C-1 AL | RB | FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$642,519.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ARAPIRACA III /PENEDO AL | LT 230 kV ARAPIRACA III /PENEDO C-1 AL | RB | FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,803,017.25 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ARAPIRACA III /PENEDO AL | LT 230 kV ARAPIRACA III /PENEDO C-1 AL | RB | FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,662,161.61 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ARAPIRACA III /PENEDO AL | LT 230 kV ARAPIRACA III /PENEDO C-1 AL | RB | FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL | 061/2001 | IPCA | RBNI | REA 10134/2021 | 8/15/2016 | 12/31/2042 | R$247,176.05 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 230 kV, circuito duplo, entre o ponto de seccionamento da linha de transmissão 230 kV Rio Largo II – Penedo e a subestação seccionadora Arapiraca III, com 46 Km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV ARAPIRACA III /PENEDO AL | LT 230 kV ARAPIRACA III /PENEDO C-1 AL | RB | FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/18/2022 | 4/17/2050 | R$115,112.79 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | LT 230 kV AREIA /GUARAPUAVA OESTE PR | LT 230 kV AREIA /GUARAPUAVA OESTE C-1 PR | RB | FT LT 230 kV AREIA /GUARAPUAVA OESTE C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$283,581.39 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV AREIA /GUARAPUAVA OESTE PR | LT 230 kV AREIA /GUARAPUAVA OESTE C-1 PR | RB | FT LT 230 kV AREIA /GUARAPUAVA OESTE C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$497,708.62 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV AREIA /GUARAPUAVA OESTE PR | LT 230 kV AREIA /GUARAPUAVA OESTE C-1 PR | RB | FT LT 230 kV AREIA /GUARAPUAVA OESTE C-1 PR | 057/2001 | IPCA | RBNI | DSP 1281/2022 | 4/18/2022 | 12/31/2042 | R$2,078.72 | 6/1/2025 | Ativa | T2018-012-D | Receita resultante do seccionamento do circuito LT 230 kV AREIA /PONTA GROSSA C-1 PR na SE GUARAPUAVA OESTE . Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Areia -Ponta Grossa C1, originado do seccionamento da Linha de Transmissão 230 kV Areia - Ponta Grossa Norte C1, e a Subestação seccionadora Ponta Grossa, com 2,83 km de extensão.Após entrar em operação, a data fim de vigência desvinculou, e precisou ser corrigida para 30/6/56 *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | LT 230 kV AREIA /GUARAPUAVA OESTE PR | LT 230 kV AREIA /GUARAPUAVA OESTE C-1 PR | RB | FT LT 230 kV AREIA /GUARAPUAVA OESTE C-1 PR | 057/2001 | IPCA | RBNI | DSP 571/2025 | 6/24/2022 | 6/23/2056 | R$648,225.13 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV Areia - Guarapuava Oeste C1, circuito duplo, para seccionamento da Linha de Transmissão 230 kV Areia -Ponta Grossa Norte C1 na Subestação seccionadora Guarapuava Oeste, com 54,53 km de extensão. | |||
| AXIA Energia Sul | LT 230 kV AREIA /S. OSORIO PR | LT 230 kV AREIA /S. OSORIO C-2 PR | RB | FT LT 230 kV AREIA /S. OSORIO C-2 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,466,168.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV AREIA /S. OSORIO PR | LT 230 kV AREIA /S. OSORIO C-2 PR | RB | FT LT 230 kV AREIA /S. OSORIO C-2 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,328,328.48 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV AREIA /S. OSORIO PR | LT 230 kV AREIA /S. OSORIO C-1 PR | RB | FT LT 230 kV AREIA /S. OSORIO C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,467,905.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV AREIA /S. OSORIO PR | LT 230 kV AREIA /S. OSORIO C-1 PR | RB | FT LT 230 kV AREIA /S. OSORIO C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,331,377.38 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV AREIA /S.MATEUS SUL PR | LT 230 kV AREIA /S.MATEUS SUL C-1 PR | RB | FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,037,242.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV AREIA /S.MATEUS SUL PR | LT 230 kV AREIA /S.MATEUS SUL C-1 PR | RB | FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,575,527.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV AREIA /S.MATEUS SUL PR | LT 230 kV AREIA /S.MATEUS SUL C-1 PR | RB | FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 3,028,534.16 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV ARIQUEMES /JARU RO | LT 230 kV ARIQUEMES /JARU C-1 RO | RB | FT LT 230 kV ARIQUEMES /JARU C-1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,749,671.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV ARIQUEMES /JI-PARANA RO | LT 230 kV ARIQUEMES /JI-PARANA C-3 RO | RB | FT LT 230 kV ARIQUEMES /JI-PARANA C-3 RO | 021/2009 | IPCA | RBL | CC 021/2009 | 10/28/2015 | 11/19/2039 | R$ 14,139,635.69 | 6/1/2025 | Ativa | T2009-245 | *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Sul | LT 230 kV ASSIS /LONDRINA COT SP/PR | LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR | RB | FT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,084,688.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV ASSIS /LONDRINA COT SP/PR | LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR | RB | FT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,658,799.81 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV ASSIS /LONDRINA COT SP/PR | LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR | RB | FT LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,805,091.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV ASSIS /LONDRINA COT SP/PR | LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR | RB | FT LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,168,083.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV ASSIS /LONDRINA COT SP/PR | LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR | RB | FT LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,683,422.13 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV ASSIS /LONDRINA COT SP/PR | LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR | RB | FT LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/31/2023 | 7/26/2059 | R$75,131.00 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | LT 230 kV ATLANTIDA 2 /GRAVATAI 3 RS | LT 230 kV ATLANTIDA 2 /GRAVATAI 3 C-1 RS | RB | FT LT 230 kV ATLANTIDA 2 /GRAVATAI 3 C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,581,942.32 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV ATLANTIDA 2 /OSORIO 2 RS | LT 230 kV ATLANTIDA 2 /OSORIO 2 C-1 RS | RB | FT LT 230 kV ATLANTIDA 2 /OSORIO 2 C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$708,391.12 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV B. ESPERANCA /TERESINA PI | LT 230 kV B. ESPERANCA /TERESINA C-2 PI | RB | FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,614,085.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV B. ESPERANCA /TERESINA PI | LT 230 kV B. ESPERANCA /TERESINA C-2 PI | RB | FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 10,141,735.86 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV B. ESPERANCA /TERESINA PI | LT 230 kV B. ESPERANCA /TERESINA C-2 PI | RB | FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/16/2022 | 11/20/2059 | R$29,831.73 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV B. ESPERANCA /TERESINA PI | LT 230 kV B. ESPERANCA /TERESINA C-1 PI | RB | FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,614,085.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV B. ESPERANCA /TERESINA PI | LT 230 kV B. ESPERANCA /TERESINA C-1 PI | RB | FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/21/2022 | 9/25/2059 | R$11,043.84 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO BA | LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA | RB | FT LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,237,118.12 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO BA | LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA | RB | FT LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,277,731.45 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO BA | LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA | RB | FT LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 5,787,301.38 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO BA | LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA | RB | FT LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA | 061/2001 | IPCA | RBNI | REA 10198/2021 | 6/19/2019 | 12/31/2042 | R$ 636.45 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de um trecho de LT em 230 kV entre o ponto de seccionamento da LT 230 kV Barreiras II – Bom Jesus da Lapa e a subestação seccionadora Tabocas do Brejo Velho, com 0,07 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO BA | LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA | RB | FT LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/11/2021 | 9/21/2056 | R$548,822.96 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| Nova Era Ceará | LT 230 kV BANABUIU /ALEX CE | LT 230 kV BANABUIU /ALEX C-2 CE | RB | FT LT 230 kV BANABUIU /ALEX C-2 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$496,845.51 | 6/1/2025 | Prevista | T2024-195-J | - Seccionamento da LT 230 kV Banabuiú – Mossoró II – C1 na subestação Alex | ||||
| AXIA Energia Nordeste | LT 230 kV BANABUIU /ALEX CE | LT 230 kV BANABUIU /ALEX C-1 CE | RB | FT LT 230 kV BANABUIU /ALEX C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,459,037.38 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV BANABUIU /ALEX CE | LT 230 kV BANABUIU /ALEX C-1 CE | RB | FT LT 230 kV BANABUIU /ALEX C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,900,474.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV BANABUIU /ALEX CE | LT 230 kV BANABUIU /ALEX C-1 CE | RB | FT LT 230 kV BANABUIU /ALEX C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 6,361,394.29 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV BANABUIU /ALEX CE | LT 230 kV BANABUIU /ALEX C-1 CE | RB | FT LT 230 kV BANABUIU /ALEX C-1 CE | 061/2001 | IPCA | RBNI | DSP 1183/2022 | 12/3/2021 | 12/31/2042 | R$26,040.32 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho com 3,6 km de extensão da Linha de Transmissão 230 kV Banabuiú - Alex I, circuito duplo, derivada do seccionamento da Linha de Transmissão 230 kV Banabuiú - Mossoró II C2 na Subestação seccionadora Alex I. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV BANABUIU /ALEX CE | LT 230 kV BANABUIU /ALEX C-1 CE | RB | FT LT 230 kV BANABUIU /ALEX C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/1/2022 | 12/5/2059 | R$342,679.38 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV BANABUIU /AQUIRAZ II CE | LT 230 kV BANABUIU /AQUIRAZ II C-3 CE | RB | FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE | 061/2001 | IPCA | RBNI | REA 3631/2012 | 11/6/2020 | 9/27/2055 | R$ 3,946,383.86 | 6/1/2025 | Ativa | T2012-075 | Instalar o circuito LT 230 kV BANABUIU /AQUIRAZ II C-3 CE originado do seccionamento do circuito LT 230 kV BANABUIU /FORTALEZA C-1 CE na SE AQUIRAZ II *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV BANABUIU /AQUIRAZ II CE | LT 230 kV BANABUIU /AQUIRAZ II C-3 CE | RB | FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,051,894.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV BANABUIU /AQUIRAZ II CE | LT 230 kV BANABUIU /AQUIRAZ II C-3 CE | RB | FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 4/19/2014 | 4/23/2051 | R$26,000.19 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE CADEIAS DE ISOLADORES DE MESMO TIPO Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV BANABUIU /AQUIRAZ II CE | LT 230 kV BANABUIU /AQUIRAZ II C-2 CE | RB | FT LT 230 kV BANABUIU /AQUIRAZ II C-2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,349,411.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV BANABUIU /AQUIRAZ II CE | LT 230 kV BANABUIU /AQUIRAZ II C-2 CE | RB | FT LT 230 kV BANABUIU /AQUIRAZ II C-2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,592,845.46 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV BANABUIU /AQUIRAZ II CE | LT 230 kV BANABUIU /AQUIRAZ II C-1 CE | RB | FT LT 230 kV BANABUIU /AQUIRAZ II C-1 CE | 061/2001 | IPCA | RBNI | REA 2823/2011 | 10/2/2020 | 9/10/2055 | R$ 2,712,027.10 | 6/1/2025 | Ativa | T2010-086 | Secionamento do segundo circuito da linha de transmissão 230 kV Banabuiu - Fortaleza I, na subestação Aquiraz II, com a construção de 20 km de linha de transmissão, com condutor CAL FLINT 740,80 MCM, resultando na LT 230 kV Banabuiú - Aquiraz II, com 184 km de extensão. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV BANABUIU /AQUIRAZ II CE | LT 230 kV BANABUIU /AQUIRAZ II C-1 CE | RB | FT LT 230 kV BANABUIU /AQUIRAZ II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,342,793.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV BANABUIU /AQUIRAZ II CE | LT 230 kV BANABUIU /AQUIRAZ II C-1 CE | RB | FT LT 230 kV BANABUIU /AQUIRAZ II C-1 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/24/2014 | 11/28/2051 | R$213,134.69 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE CADEIAS DE ISOLADORES DE MESMO TIPO Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV BANABUIU /AQUIRAZ II CE | LT 230 kV BANABUIU /AQUIRAZ II C-1 CE | RB | FT LT 230 kV BANABUIU /AQUIRAZ II C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,574,274.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV BANABUIU /ICO CE | LT 230 kV BANABUIU /ICO C-2 CE | RB | FT LT 230 kV BANABUIU /ICO C-2 CE | 061/2001 | IPCA | RBNIA | DSP 2563/2023 | R$217,819.85 | 6/1/2025 | Prevista | T2023-128 | Instalar o circuito LT 230 kV BANABUIU /ICO C-2 CE originado do seccionamento do circuito LT 230 kV MILAGRES /BANABUIU C-2 CE na SE ICO | ||||
| AXIA Energia Nordeste | LT 230 kV BANABUIU /ICO CE | LT 230 kV BANABUIU /ICO C-1 CE | RB | FT LT 230 kV BANABUIU /ICO C-1 CE | 061/2001 | IPCA | RBNI | REA 1312/2008 | 11/13/2012 | 7/7/2052 | R$276,624.21 | 6/1/2025 | Ativa | T2000-194 | Instalar o circuito C1 da LT 230 kV ICO /BANABUIU CE originado do seccionamento do circuito LT 230 kV MILAGRES /BANABUIU C-3 CE na SE ICO *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV BANABUIU /ICO CE | LT 230 kV BANABUIU /ICO C-1 CE | RB | FT LT 230 kV BANABUIU /ICO C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,621,516.33 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV BANABUIU /ICO CE | LT 230 kV BANABUIU /ICO C-1 CE | RB | FT LT 230 kV BANABUIU /ICO C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,550,248.82 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| Nova Era Ceará | LT 230 kV BANABUIU /MORADA NOVA CE | LT 230 kV BANABUIU /MORADA NOVA C-2 CE | RB | FT LT 230 kV BANABUIU /MORADA NOVA C-2 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$352,902.57 | 6/1/2025 | Prevista | T2024-195-D | - Seccionamento da LT 230 kV Banabuiú – Russas II – C2 na subestação Morada Nova. | ||||
| Nova Era Ceará | LT 230 kV BANABUIU /MORADA NOVA CE | LT 230 kV BANABUIU /MORADA NOVA C-1 CE | RB | FT LT 230 kV BANABUIU /MORADA NOVA C-1 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 5,928,897.48 | 6/1/2025 | Prevista | T2024-195-E | - LT 230 kV Banabuiú - Morada Nova, C1, CS; | ||||
| AXIA Energia Nordeste | LT 230 kV BANABUIU /MOSSORO II CE/RN | LT 230 kV BANABUIU /MOSSORO II C-2 CE/RN | RB | FT LT 230 kV BANABUIU /MOSSORO II C-2 CE/RN | 061/2001 | IPCA | RBNI | REA 2173/2009 | 6/6/2016 | 6/10/2053 | R$ 6,448,171.39 | 6/1/2025 | Ativa | T2009-154 | Lançar o segundo circuito da LT 230 kV Banabuiu / Mossoró II, com 177,4 km de extensão, um cabo por fase CAA 636 MCM GROSBEAK. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV BANABUIU /MOSSORO II CE/RN | LT 230 kV BANABUIU /MOSSORO II C-2 CE/RN | RB | FT LT 230 kV BANABUIU /MOSSORO II C-2 CE/RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/31/2017 | 10/30/2042 | R$687,131.55 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV BANABUIU /RUSSAS II CE | LT 230 kV BANABUIU /RUSSAS II C-1 CE | RB | FT LT 230 kV BANABUIU /RUSSAS II C-1 CE | 061/2001 | IPCA | RBNI | REA 2173/2009 | 9/10/2019 | 7/16/2053 | R$809,792.90 | 6/1/2025 | Ativa | T2009-155 | Recapacitar a LT 230 kV Banabuiu / Russas II com 110,4 km de extensão, um cabo por fase, CAA 636 MCM GROSBEAK, instalando novas estruturas nos vãos e trocando os isoladores por tipo poliméricos. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV BANABUIU /RUSSAS II CE | LT 230 kV BANABUIU /RUSSAS II C-1 CE | RB | FT LT 230 kV BANABUIU /RUSSAS II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,015,126.71 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV BARRA PEIXE /RONDONOPOLIS MT | LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT | RB | FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 4,716,256.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV BARRA PEIXE /RONDONOPOLIS MT | LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT | RB | FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 10,238,633.72 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV BARRA PEIXE /RONDONOPOLIS MT | LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT | RB | FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 9,819,843.10 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV BARRA PEIXE /RONDONOPOLIS MT | LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT | RB | FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 4,596,822.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV BARRA PEIXE /RONDONOPOLIS MT | LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT | RB | FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 9,979,350.08 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV BARRA PEIXE /RONDONOPOLIS MT | LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT | RB | FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 9,571,164.94 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV BARREIRAS II /BARREIRAS BA | LT 230 kV BARREIRAS II /BARREIRAS C-1 BA | RB | FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$255,541.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV BARREIRAS II /BARREIRAS BA | LT 230 kV BARREIRAS II /BARREIRAS C-1 BA | RB | FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$717,092.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV BARREIRAS II /BARREIRAS BA | LT 230 kV BARREIRAS II /BARREIRAS C-1 BA | RB | FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$661,071.61 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV BARREIRAS II /BARREIRAS BA | LT 230 kV BARREIRAS II /BARREIRAS C-1 BA | RB | FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA | 061/2001 | IPCA | RBNI | REA 9680/2021 | 11/19/2019 | 12/31/2042 | R$28,294.83 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 230 kV, circuito simples, entre o ponto de seccionamento da Linha de Transmissão 230 kV Barreiras – Bom Jesus da Lapa na Subestação Barreiras II, com 3,2 Km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | LT 230 kV BARRO ALTO /AGUAS LINDAS GO | LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO | RB | FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO | 062/2001 | IPCA | RBNI | REA 2367/2010 | 11/24/2013 | 3/18/2040 | R$8,464.23 | 6/1/2025 | Ativa | T2009-133 | Instalar o circuito LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO originado do seccionamento do circuito LT 230 kV BARRO ALTO /BRAS. SUL C-1 GO/DF na SE AGUAS LINDAS *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | LT 230 kV BARRO ALTO /AGUAS LINDAS GO | LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO | RB | FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,214,027.90 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV BARRO ALTO /AGUAS LINDAS GO | LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO | RB | FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 8,496,060.22 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV BARRO ALTO /NIQUELANDIA GO | LT 230 kV BARRO ALTO /NIQUELANDIA C-2 GO | RB | FT LT 230 kV BARRO ALTO /NIQUELANDIA C-2 GO | 028/2009 | IPCA | RBL | CC 028/2009 | 7/1/2016 | 11/19/2039 | R$ 5,832,580.79 | 6/1/2025 | Ativa | T2009-241-B | Contrato de Concessão nº 028/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia | LT 230 kV BARRO ALTO /NIQUELANDIA GO | LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO | RB | FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,888,435.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV BARRO ALTO /NIQUELANDIA GO | LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO | RB | FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 7,246,639.60 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV BARRO ALTO /NIQUELANDIA GO | LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO | RB | FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 7,768,785.58 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV BIGUACU /DESTERRO SC | LT 230 kV BIGUACU /DESTERRO C-1 SC | RB | FT LT 230 kV BIGUACU /DESTERRO C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$893,543.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV BIGUACU /GASPAR 2 SC | LT 230 kV BIGUACU /GASPAR 2 C-1 SC | RB | FT LT 230 kV BIGUACU /GASPAR 2 C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,664,537.49 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV BIGUACU /GASPAR 2 SC | LT 230 kV BIGUACU /GASPAR 2 C-1 SC | RB | FT LT 230 kV BIGUACU /GASPAR 2 C-1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,921,399.99 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV BIGUACU /GASPAR 2 SC | LT 230 kV BIGUACU /GASPAR 2 C-1 SC | RB | FT LT 230 kV BIGUACU /GASPAR 2 C-1 SC | 057/2001 | IPCA | RBNI | REA 7009/2018 | 1/22/2016 | 12/31/2042 | R$13,726.49 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de um trecho de 2,5 km de linha de transmissão em 230 kV, circuito duplo, entre o ponto de seccionamento da linha de transmissão 230 kV Blumenau - Biguaçu e a subestação seccionadora Gaspar 2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | LT 230 kV BIGUACU /J.LACERDA-B SC | LT 230 kV BIGUACU /J.LACERDA-B C-1 SC | RB | FT LT 230 kV BIGUACU /J.LACERDA-B C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,045,138.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV BIGUACU /J.LACERDA-B SC | LT 230 kV BIGUACU /J.LACERDA-B C-1 SC | RB | FT LT 230 kV BIGUACU /J.LACERDA-B C-1 SC | 057/2001 | IPCA | RMEL | REN 643/2014 | 8/30/2014 | 9/3/2051 | R$330,156.62 | 6/1/2025 | Ativa | Substituição de 50km de cabo para-raios. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | LT 230 kV BIGUACU /J.LACERDA-B SC | LT 230 kV BIGUACU /J.LACERDA-B C-1 SC | RB | FT LT 230 kV BIGUACU /J.LACERDA-B C-1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,589,386.13 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV BIGUACU /J.LACERDA-B SC | LT 230 kV BIGUACU /J.LACERDA-B C-1 SC | RB | FT LT 230 kV BIGUACU /J.LACERDA-B C-1 SC | 057/2001 | IPCA | RMEL | REA 7759/2019 | 5/7/2020 | 2/21/2055 | R$529,334.70 | 6/1/2025 | Ativa | T2019-013 | Adequação na LT 230 kV Biguaçu / J Lacerda B C-1, com a substituição de fundações de 33 torres e do sistema de aterramento com instalação de contrapeso nas 248 torres. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | LT 230 kV BIGUACU /PALHOCA ESU SC | LT 230 kV BIGUACU /PALHOCA ESU C-1 SC | RB | FT LT 230 kV BIGUACU /PALHOCA ESU C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$401,421.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV BLUMENAU /ITAJAI SC | LT 230 kV BLUMENAU /ITAJAI C-2 SC | RB | FT LT 230 kV BLUMENAU /ITAJAI C-2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$468,064.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV BLUMENAU /ITAJAI SC | LT 230 kV BLUMENAU /ITAJAI C-1 SC | RB | FT LT 230 kV BLUMENAU /ITAJAI C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$468,064.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV BLUMENAU /JOINV.NORTE SC | LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC | RB | FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,150,489.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV BLUMENAU /JOINV.NORTE SC | LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC | RB | FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,019,202.93 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV BLUMENAU /JOINV.NORTE SC | LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC | RB | FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC | 057/2001 | IPCA | RBNI | REA 9655/2021 | 10/1/2023 | 9/30/2051 | R$ 2,517,314.31 | 6/1/2025 | Ativa | T2021-002 | Recapacitação de trecho de 17,26 km de extensão entre a SE Joinville Norte e o ponto de seccionamento da LT 230 kV Blumenau - Joinville Norte para a SE Joinville Sul. | ||
| AXIA Energia Sul | LT 230 kV BLUMENAU /JOINVILLE SC | LT 230 kV BLUMENAU /JOINVILLE C-1 SC | RB | FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,058,102.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV BLUMENAU /JOINVILLE SC | LT 230 kV BLUMENAU /JOINVILLE C-1 SC | RB | FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,857,056.92 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV BLUMENAU /JOINVILLE SC | LT 230 kV BLUMENAU /JOINVILLE C-1 SC | RB | FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC | 057/2001 | IPCA | RBNI | REA 9655/2021 | 7/25/2023 | 7/24/2051 | R$ 1,787,445.46 | 6/1/2025 | Ativa | T2021-004 | Recapacitação de trecho de 12,35 km de extensão entre a SE Joinville e o ponto de seccionamento da LT 230 kV Blumenau - Joinville para a SE Joinville Sul. A capacidade do trecho passará de 609A (longa duração)e 767A (curta duração) para respectivamente 1.631A e 2.133A. | ||
| AXIA Energia Norte | LT 230 kV BOA VISTA /S.E.UIAREN VEN RR | LT 230 kV BOA VISTA /S.E.UIAREN VEN C-1 RR | RB | FT LT 230 kV BOA VISTA /S.E.UIAREN VEN C-1 RR | 058/2001 | IPCA | RBNI | PRT 631/2022 | 6/7/2021 | 12/31/2042 | R$ 5,040,194.60 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 230 kV Boa Vista-Santa Elena do Uiarén C1, em circuito simples, com 191,02 km de extensão, e cobertura do montante referente a componente indígena da servidão desta linha de transmissão. | |||
| AXIA Energia Nordeste | LT 230 kV BOM NOME /ABAIARA PE/CE | LT 230 kV BOM NOME /ABAIARA C-1 PE/CE | RB | FT LT 230 kV BOM NOME /ABAIARA C-1 PE/CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,381,749.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV BOM NOME /ABAIARA PE/CE | LT 230 kV BOM NOME /ABAIARA C-1 PE/CE | RB | FT LT 230 kV BOM NOME /ABAIARA C-1 PE/CE | 061/2001 | IPCA | RBNI | DSP 872/2024 | 12/7/2023 | 12/6/2057 | R$91,952.09 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Bom Nome -Abaiara C1, originado do seccionamento da Linha de Transmissão 230 kV Bom Nome - Milagres C2 na Subestação seccionadora Abaiara, com 6,7 km de extensão. | |||
| Nova Era Integração | LT 230 kV BOM NOME /BOM NOME II PE | LT 230 kV BOM NOME /BOM NOME II C-2 PE | RB | FT LT 230 kV BOM NOME /BOM NOME II C-2 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$611,935.77 | 6/1/2025 | Prevista | T2024-197-A | LT 230 kV Bom Nome - Bom Nome II - C1LT 230 kV Bom Nome - Bom Nome II - C2 | ||||
| Nova Era Integração | LT 230 kV BOM NOME /BOM NOME II PE | LT 230 kV BOM NOME /BOM NOME II C-1 PE | RB | FT LT 230 kV BOM NOME /BOM NOME II C-1 PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$656,782.13 | 6/1/2025 | Prevista | T2024-197-A | LT 230 kV Bom Nome - Bom Nome II - C1LT 230 kV Bom Nome - Bom Nome II - C2 | ||||
| AXIA Energia Nordeste | LT 230 kV BOM NOME /MAURITI II PE/CE | LT 230 kV BOM NOME /MAURITI II C-1 PE/CE | RB | FT LT 230 kV BOM NOME /MAURITI II C-1 PE/CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,288,658.93 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV BOM NOME /MAURITI II PE/CE | LT 230 kV BOM NOME /MAURITI II C-1 PE/CE | RB | FT LT 230 kV BOM NOME /MAURITI II C-1 PE/CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,616,194.70 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV BOM NOME /MILAGRES PE/CE | LT 230 kV BOM NOME /MILAGRES C-1 PE/CE | RB | FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,527,772.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV BOM NOME /MILAGRES PE/CE | LT 230 kV BOM NOME /MILAGRES C-1 PE/CE | RB | FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/31/2023 | 2/4/2060 | R$170,114.52 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV BONGI /ACONORTE PE | LT 230 kV BONGI /ACONORTE C-1 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$131,421.31 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV BONGI /ACONORTE PE | LT 230 kV BONGI /ACONORTE C-1 PE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$368,790.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV BONGI /ACONORTE PE | LT 230 kV BONGI /ACONORTE C-1 PE | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/23/2019 | 10/26/2052 | R$192,656.72 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | LT 230 kV BONGI /JOAIRAM PE | LT 230 kV BONGI /JOAIRAM C-3 PE | RB | FT LT 230 kV BONGI /JOAIRAM C-3 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$110,646.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV BONGI /JOAIRAM PE | LT 230 kV BONGI /JOAIRAM C-2 PE | RB | FT LT 230 kV BONGI /JOAIRAM C-2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$110,646.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV BONGI /JOAIRAM PE | LT 230 kV BONGI /JOAIRAM C-1 PE | RB | FT LT 230 kV BONGI /JOAIRAM C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$137,992.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV BONGI /JOAIRAM PE | LT 230 kV BONGI /JOAIRAM C-1 PE | RB | FT LT 230 kV BONGI /JOAIRAM C-1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/4/2018 | 10/8/2055 | R$59,185.57 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| VSB | LT 230 kV BRAS. GERAL /BRAS. SUL DF | LT 230 kV BRAS. GERAL /BRAS. SUL C-3 DF | RB | FT LT 230 kV BRAS. GERAL /BRAS. SUL C-3 DF | 014/2013 | IPCA | RBL | CC 014/2013 | 4/27/2017 | 10/9/2043 | R$ 11,218,123.46 | 6/1/2025 | Ativa | T2014-015-C | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia | LT 230 kV BRAS. GERAL /BRAS. SUL DF | LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF | RB | FT LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$271,762.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV BRAS. GERAL /BRAS. SUL DF | LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF | RB | FT LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$271,762.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV BRAS. SUL /PIRINEUS DF/GO | LT 230 kV BRAS. SUL /PIRINEUS C-1 DF/GO | RB | FT LT 230 kV BRAS. SUL /PIRINEUS C-1 DF/GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,864,013.52 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV BROT.MACAUBAS /B.JESUS LAPA BA | LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA | RB | FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 5,492,523.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV BROT.MACAUBAS /B.JESUS LAPA BA | LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA | RB | FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA | 061/2001 | IPCA | RBNI | REA 4629/2014 | 9/27/2013 | 12/31/2042 | R$341,628.44 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho do circuito 1 da LT 230 kV Brotas de Macaúbas / Bom Jesus da Lapa, de 27,138 km, em circuito duplo, cabo condutor CAA 636 MCM Grosbeak, compreendido entre o ponto de seccionamento da linha de transmissão 230 kV Irecê / Bom Jesus da Lapa e a subestação Brotas de Macaúbas. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV BROT.MACAUBAS /B.JESUS LAPA BA | LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA | RB | FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 15,412,948.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV BRUMADO II /IBICOARA BA | LT 230 kV BRUMADO II /IBICOARA C-1 BA | RB | FT LT 230 kV BRUMADO II /IBICOARA C-1 BA | 010/2007 | IPCA | RBL | CC 010/2007 | 6/11/2007 | 6/11/2037 | R$ 4,953,357.21 | 6/1/2025 | Ativa | T2000-115 | Contrato de Concessão nº 010/2007 *(Considera adicional de RGR relativo à prorrogação do encargo. Receita revisada em 19/06/2012 no reajuste para o Ciclo 2012-2013. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE II /COTEMINAS PB | LT 230 kV C.GRANDE II /COTEMINAS C-1 PB | RB | FT LT 230 kV C.GRANDE II /COTEMINAS C-1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$35,346.92 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE II /COTEMINAS PB | LT 230 kV C.GRANDE II /COTEMINAS C-1 PB | RB | FT LT 230 kV C.GRANDE II /COTEMINAS C-1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$99,189.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE II /COTEMINAS PB | LT 230 kV C.GRANDE II /COTEMINAS C-1 PB | RB | FT LT 230 kV C.GRANDE II /COTEMINAS C-1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$91,440.54 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE II /PARAISO PB/RN | LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN | RB | FT LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,714,441.97 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE II /PARAISO PB/RN | LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN | RB | FT LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,811,013.85 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE II /PARAISO PB/RN | LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN | RB | FT LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/6/2021 | 11/10/2058 | R$11,620.29 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE II /PARAISO PB/RN | LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN | RB | FT LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,701,475.60 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE II /PARAISO PB/RN | LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN | RB | FT LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,774,628.03 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE III /C.GRANDE II PB | LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB | RB | FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,073.69 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE III /C.GRANDE II PB | LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB | RB | FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,250.96 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE III /C.GRANDE II PB | LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB | RB | FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$186,450.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE III /C.GRANDE II PB | LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB | RB | FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB | 061/2001 | IPCA | RBNI | REA 10226/2021 | 1/27/2017 | 12/31/2042 | R$34,809.27 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 230 kV Campina Grande II-Campina Grande III C3, em circuito duplo, originado do seccionamento da linha de transmissão 230 kV Campina Grande II - Extremoz II e a subestação seccionadora Campina Grande III, com 6,5 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE III /C.GRANDE II PB | LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB | RB | FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$35,871.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE III /C.GRANDE II PB | LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB | RB | FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$100,662.15 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE III /C.GRANDE II PB | LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB | RB | FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$92,798.20 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE III /C.GRANDE II PB | LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB | RB | FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB | 061/2001 | IPCA | RBNI | REA 10226/2021 | 1/27/2017 | 12/31/2042 | R$34,809.27 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 230 kV Campina Grande II-Campina Grande III C2, em circuito duplo, originado do seccionamento da linha de transmissão 230 kV Campina Grande II - Extremoz II e a subestação seccionadora Campina Grande III, com 6,5 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE III /C.GRANDE II PB | LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB | RB | FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/26/2016 | 4/25/2049 | R$9,634.30 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE III /C.GRANDE II PB | LT 230 kV C.GRANDE III /C.GRANDE II C-1 PB | RB | FT LT 230 kV C.GRANDE III /C.GRANDE II C-1 PB | 008/2011 | IPCA | RBL | CC 008/2011 | 5/13/2015 | 10/13/2041 | R$287,146.13 | 6/1/2025 | Ativa | T2011-180-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN | LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN | RB | FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,353,870.49 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN | LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN | RB | FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,799,189.35 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN | LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN | RB | FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 3,502,388.39 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN | LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN | RB | FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN | 061/2001 | IPCA | RBNI | REA 3208/2011 | 1/6/2020 | 3/26/2053 | R$ 4,090,460.55 | 6/1/2025 | Ativa | T2011-151 | Implantar o circuito 2 da LT 230 kV Campina Grande II / Extremoz II originado do seccionamento do circuito 2 da LT 230 kV Campina Grande II / Natal III. (Nova Configuração: Instalar o circuito LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN originado do seccionamento do circuito LT 230 kV C.GRANDE III /NATAL III C-1 PB/RN na SE EXTREMOZ II) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN | LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN | RB | FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN | 061/2001 | IPCA | RBNI | REA 10226/2021 | 1/27/2017 | 12/31/2042 | R$34,809.27 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 230 kV Campina Grande III-Extremoz II C2, em circuito duplo, originado do seccionamento da linha de transmissão 230 kV Campina Grande II - Extremoz II e a subestação seccionadora Campina Grande III, com 6,5 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN | LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN | RB | FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/15/2022 | 4/19/2059 | R$6,614.00 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE III /RIACHAO II PB/RN | LT 230 kV C.GRANDE III /RIACHAO II C-1 PB/RN | RB | FT LT 230 kV C.GRANDE III /RIACHAO II C-1 PB/RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,246,786.69 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE III /RIACHAO II PB/RN | LT 230 kV C.GRANDE III /RIACHAO II C-1 PB/RN | RB | FT LT 230 kV C.GRANDE III /RIACHAO II C-1 PB/RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,498,694.13 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE III /RIACHAO II PB/RN | LT 230 kV C.GRANDE III /RIACHAO II C-1 PB/RN | RB | FT LT 230 kV C.GRANDE III /RIACHAO II C-1 PB/RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 3,225,368.52 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE III /RIACHAO II PB/RN | LT 230 kV C.GRANDE III /RIACHAO II C-1 PB/RN | RB | FT LT 230 kV C.GRANDE III /RIACHAO II C-1 PB/RN | 061/2001 | IPCA | RBNI | REA 10141/2021 | 8/15/2016 | 12/31/2042 | R$48,188.41 | 6/1/2025 | Ativa | T2023-155 | Receita resultante do seccionamento do circuito LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN na SE RIACHAO II. Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 230 kV, circuito simples, entre o ponto de seccionamento da linha de transmissão 230 kV Campina Grande II - Natal III e a subestação seccionadora Extremoz II, com 16,5 km de extensão. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE III /RIACHAO II PB/RN | LT 230 kV C.GRANDE III /RIACHAO II C-1 PB/RN | RB | FT LT 230 kV C.GRANDE III /RIACHAO II C-1 PB/RN | 061/2001 | IPCA | RBNI | REA 10226/2021 | 1/27/2017 | 12/31/2042 | R$17,657.39 | 6/1/2025 | Ativa | T2023-155 | Receita resultante do seccionamento do circuito LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN na SE RIACHAO II. Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 230 kV Campina Grande III-Extremoz II C1, em circuito duplo, originado do seccionamento da linha de transmissão 230 kV Campina Grande II - Extremoz II e a subestação seccionadora Campina Grande III, com 6,5 km de extensão. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE III /RIACHAO II PB/RN | LT 230 kV C.GRANDE III /RIACHAO II C-1 PB/RN | RB | FT LT 230 kV C.GRANDE III /RIACHAO II C-1 PB/RN | 061/2001 | IPCA | RBNI | DSP 1151/2024 | 11/3/2023 | 11/2/2057 | R$13,282.38 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito simples, Campina Grande III -Riachão II C1, originado do seccionamento da Linha de Transmissão 230 kV Campina Grande III - Extremoz II C1 na Subestação seccionadora Riachão II, com 1,6 km de extensão. | |||
| AXIA Energia Nordeste | LT 230 kV C.GRANDE III /RIACHAO II PB/RN | LT 230 kV C.GRANDE III /RIACHAO II C-1 PB/RN | RB | FT LT 230 kV C.GRANDE III /RIACHAO II C-1 PB/RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/27/2016 | 4/26/2049 | R$38,977.23 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | LT 230 kV C.I.AUT.GRA /GRAVATAI 3 RS | LT 230 kV C.I.AUT.GRA /GRAVATAI 3 C-1 RS | RB | FT LT 230 kV C.I.AUT.GRA /GRAVATAI 3 C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,292.52 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV C.MOURAO /APUCARANA PR | LT 230 kV C.MOURAO /APUCARANA C-1 PR | RB | FT LT 230 kV C.MOURAO /APUCARANA C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,808,249.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV C.MOURAO /APUCARANA PR | LT 230 kV C.MOURAO /APUCARANA C-1 PR | RB | FT LT 230 kV C.MOURAO /APUCARANA C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,173,627.12 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV C.MOURAO /MARINGA PR | LT 230 kV C.MOURAO /MARINGA C-1 PR | RB | FT LT 230 kV C.MOURAO /MARINGA C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,261,826.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV C.MOURAO /MARINGA PR | LT 230 kV C.MOURAO /MARINGA C-1 PR | RB | FT LT 230 kV C.MOURAO /MARINGA C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,214,609.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV C.MOURAO /S. OSORIO PR | LT 230 kV C.MOURAO /S. OSORIO C-2 PR | RB | FT LT 230 kV C.MOURAO /S. OSORIO C-2 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,863,194.00 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV C.MOURAO /S. OSORIO PR | LT 230 kV C.MOURAO /S. OSORIO C-2 PR | RB | FT LT 230 kV C.MOURAO /S. OSORIO C-2 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 5,025,140.58 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV C.MOURAO /S. OSORIO PR | LT 230 kV C.MOURAO /S. OSORIO C-1 PR | RB | FT LT 230 kV C.MOURAO /S. OSORIO C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,861,614.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV C.MOURAO /S. OSORIO PR | LT 230 kV C.MOURAO /S. OSORIO C-1 PR | RB | FT LT 230 kV C.MOURAO /S. OSORIO C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 5,022,368.86 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /BRAS.C.SODA BA | LT 230 kV CAMACARI II /BRAS.C.SODA C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$157,705.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /BRAS.C.SODA BA | LT 230 kV CAMACARI II /BRAS.C.SODA C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$442,548.47 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /BRAS.C.SODA BA | LT 230 kV CAMACARI II /BRAS.C.SODA C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$407,975.62 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /BRAS.C.SODA BA | LT 230 kV CAMACARI II /BRAS.C.SODA C-1 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/22/2022 | 6/26/2059 | R$34,013.79 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /BRASKEM BA | LT 230 kV CAMACARI II /BRASKEM C-2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$131,421.31 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /BRASKEM BA | LT 230 kV CAMACARI II /BRASKEM C-2 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$368,790.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /BRASKEM BA | LT 230 kV CAMACARI II /BRASKEM C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$131,421.31 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /BRASKEM BA | LT 230 kV CAMACARI II /BRASKEM C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$368,790.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /BRASKEM BA | LT 230 kV CAMACARI II /BRASKEM C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$339,979.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /BRASKEM BA | LT 230 kV CAMACARI II /BRASKEM C-1 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/25/2021 | 10/29/2058 | R$67,589.33 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /CARAIBAS BA | LT 230 kV CAMACARI II /CARAIBAS C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$75,932.31 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /CARAIBAS BA | LT 230 kV CAMACARI II /CARAIBAS C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$213,078.90 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /CARAIBAS BA | LT 230 kV CAMACARI II /CARAIBAS C-1 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/9/2023 | 1/13/2060 | R$45,370.06 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /COTEGIPE BA | LT 230 kV CAMACARI II /COTEGIPE C-1 BA | RB | FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$471,839.00 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /COTEGIPE BA | LT 230 kV CAMACARI II /COTEGIPE C-1 BA | RB | FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA | 061/2001 | IPCA | RBNI | REA 6258/2017 | 11/27/2020 | 2/21/2051 | R$825,705.10 | 6/1/2025 | Ativa | T2016-097 | Recapacitação da LT 230 kV Camaçari II - Cotegipe *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /COTEGIPE BA | LT 230 kV CAMACARI II /COTEGIPE C-1 BA | RB | FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,324,059.96 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /FEIRA DE SANTANA III BA | LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-1 BA | RB | FT LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$536,734.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /FEIRA DE SANTANA III BA | LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-1 BA | RB | FT LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,506,166.71 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /FEIRA DE SANTANA III BA | LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-1 BA | RB | FT LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-1 BA | 061/2001 | IPCA | RBNI | REA 2891/2011 | 11/30/2015 | 10/2/2052 | R$43,426.52 | 6/1/2025 | Ativa | T2018-073 | Receita resultante do seccionamento do circuito LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA na SE FEIRA DE SANTANA III . Complementar o segundo circuito da LT 230 kV Camaçari II - Gov. Mangabeira, para separar este do circuito sob responsabilidade da Afluente. *(Inclui alterações estabelecidas pela Lei 12.783/2013)*(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /FEIRA DE SANTANA III BA | LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-1 BA | RB | FT LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-1 BA | 061/2001 | IPCA | RBNI | DSP 337/2023 | 9/26/2022 | 12/31/2042 | R$356,927.86 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Feira de Santana III-Camaçari II C1, originado do seccionamento da Linha de Transmissão 230 kV Governador Mangabeira - Camaçari II C2 na Subestação seccionadora Feira de Santana III, com 54,17 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /FEIRA DE SANTANA III BA | LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-1 BA | RB | FT LT 230 kV CAMACARI II /FEIRA DE SANTANA III C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/22/2022 | 12/26/2059 | R$111,939.34 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /G.MANGABEIRA BA | LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,205,872.21 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /G.MANGABEIRA BA | LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,383,881.17 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /G.MANGABEIRA BA | LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/30/2022 | 5/4/2059 | R$427,527.43 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /MATATU BA | LT 230 kV CAMACARI II /MATATU C-1 BA | RB | FT LT 230 kV CAMACARI II /MATATU C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$857,889.09 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /MATATU BA | LT 230 kV CAMACARI II /MATATU C-1 BA | RB | FT LT 230 kV CAMACARI II /MATATU C-1 BA | 061/2001 | IPCA | RBNI | REA 7761/2019 | 1/1/2021 | 12/31/2053 | R$529,052.95 | 6/1/2025 | Ativa | Substituição de 2 Cabos Para-raios. Dotterel e/ou EHS 3/8” (Cada Cabo Para-Raios possui 31,87 km do Cabo tipo Dotterel) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /MATATU BA | LT 230 kV CAMACARI II /MATATU C-1 BA | RB | FT LT 230 kV CAMACARI II /MATATU C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/17/2019 | 5/9/2055 | R$555,452.08 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /PITUACU BA | LT 230 kV CAMACARI II /PITUACU C-1 BA | RB | FT LT 230 kV CAMACARI II /PITUACU C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$564,757.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /PITUACU BA | LT 230 kV CAMACARI II /PITUACU C-1 BA | RB | FT LT 230 kV CAMACARI II /PITUACU C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,584,804.56 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /PITUACU BA | LT 230 kV CAMACARI II /PITUACU C-1 BA | RB | FT LT 230 kV CAMACARI II /PITUACU C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,460,996.18 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CAMACARI II /PITUACU BA | LT 230 kV CAMACARI II /PITUACU C-1 BA | RB | FT LT 230 kV CAMACARI II /PITUACU C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/24/2021 | 10/28/2058 | R$354,310.72 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV CAMACARI IV /COTEGIPE BA | LT 230 kV CAMACARI IV /COTEGIPE C-1 BA | RB | FT LT 230 kV CAMACARI IV /COTEGIPE C-1 BA | 061/2001 | IPCA | RBNI | REA 2891/2011 | 6/2/2014 | 6/6/2051 | R$972,577.29 | 6/1/2025 | Ativa | T2010-038 | Remanejar a LT 230 kV Camaçari II/ Cotegipe - C1 para a futura SE Camaçari IV, com a construção de 0,6 km com cabos subterrâneos isolados XLP 500 mm2 *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV CAMACARI IV /COTEGIPE BA | LT 230 kV CAMACARI IV /COTEGIPE C-1 BA | RB | FT LT 230 kV CAMACARI IV /COTEGIPE C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$461,799.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CAMACARI IV /JACARACANGA BA | LT 230 kV CAMACARI IV /JACARACANGA C-2 BA | RB | FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$304,277.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CAMACARI IV /JACARACANGA BA | LT 230 kV CAMACARI IV /JACARACANGA C-2 BA | RB | FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$853,853.89 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CAMACARI IV /JACARACANGA BA | LT 230 kV CAMACARI IV /JACARACANGA C-2 BA | RB | FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/5/2016 | 5/9/2053 | R$955,827.56 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV CAMACARI IV /JACARACANGA BA | LT 230 kV CAMACARI IV /JACARACANGA C-1 BA | RB | FT LT 230 kV CAMACARI IV /JACARACANGA C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$304,277.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CAMACARI IV /JACARACANGA BA | LT 230 kV CAMACARI IV /JACARACANGA C-1 BA | RB | FT LT 230 kV CAMACARI IV /JACARACANGA C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$853,853.89 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CAMACARI IV /JACARACANGA BA | LT 230 kV CAMACARI IV /JACARACANGA C-1 BA | RB | FT LT 230 kV CAMACARI IV /JACARACANGA C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/4/2016 | 5/8/2053 | R$36,561.93 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV CAMACARI IV /PITUACU BA | LT 230 kV CAMACARI IV /PITUACU C-1 BA | RB | FT LT 230 kV CAMACARI IV /PITUACU C-1 BA | 061/2001 | IPCA | RBNI | REA 2891/2011 | 5/5/2014 | 5/9/2051 | R$532,705.05 | 6/1/2025 | Ativa | T2010-074 | Remanejar a LT 230 kV Camaçari II/ Pituaçu - C1 para a futura SE Camaçari IV, com a construção de 0,4 km com cabos subterrâneos isolados XLP 500 mm2 *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV CAMACARI IV /PITUACU BA | LT 230 kV CAMACARI IV /PITUACU C-1 BA | RB | FT LT 230 kV CAMACARI IV /PITUACU C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$564,757.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CAMACARI IV /PITUACU BA | LT 230 kV CAMACARI IV /PITUACU C-1 BA | RB | FT LT 230 kV CAMACARI IV /PITUACU C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,584,804.56 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CAMACARI IV /PITUACU BA | LT 230 kV CAMACARI IV /PITUACU C-1 BA | RB | FT LT 230 kV CAMACARI IV /PITUACU C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/18/2022 | 8/22/2059 | R$519,887.60 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | LT 230 kV CAMAQUA 3 /NOVA STA RITA RS | LT 230 kV CAMAQUA 3 /NOVA STA RITA C-1 RS | RB | FT LT 230 kV CAMAQUA 3 /NOVA STA RITA C-1 RS | 004/2012 | IPCA | RBL | CC 004/2012 | 12/9/2014 | 5/10/2042 | R$ 9,516,853.72 | 6/1/2025 | Ativa | T2012-074-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Sul | LT 230 kV CAMAQUA 3 /POVO NOVO RS | LT 230 kV CAMAQUA 3 /POVO NOVO C-1 RS | RB | FT LT 230 kV CAMAQUA 3 /POVO NOVO C-1 RS | 004/2012 | IPCA | RBL | CC 004/2012 | 12/9/2014 | 5/10/2042 | R$ 10,025,067.00 | 6/1/2025 | Ativa | T2012-074-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Sul | LT 230 kV CAMAQUA 3 /POVO NOVO RS | LT 230 kV CAMAQUA 3 /POVO NOVO C-1 RS | RB | FT LT 230 kV CAMAQUA 3 /POVO NOVO C-1 RS | 004/2012 | IPCA | RBNI | DSP 1446/2022 | 9/30/2015 | 5/9/2042 | R$34,395.00 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Camaquã 3 -Povo Novo C1, originado do seccionamento da Linha de Transmissão 230 kV Camaquã 3 - Quinta C1, e a Subestação seccionadora Povo Novo, com2 km de extensão. | |||
| AXIA Energia Nordeste | LT 230 kV CAMPO FORMOSO /OUROLANDIA II BA | LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA | RB | FT LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,575,876.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CAMPO FORMOSO /OUROLANDIA II BA | LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA | RB | FT LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,422,176.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CAMPO FORMOSO /OUROLANDIA II BA | LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA | RB | FT LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA | 061/2001 | IPCA | RBNI | REA 9690/2021 | 6/4/2019 | 12/31/2042 | R$144,790.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 230 kV, circuito simples, entre o ponto de seccionamento da Linha de Transmissão 230kV Irecê – Campo Formoso e a Subestação Ourolândia II, com 22 Km de extensão (conforme cadastro Siget). *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV CAMPO FORMOSO /OUROLANDIA II BA | LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA | RB | FT LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA | 061/2001 | IPCA | RBNI | DSP 1172/2022 | 11/25/2015 | 12/31/2042 | R$32,354.03 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Campo Formoso – Ourolândia II (anteriormente, a linha ia diretamente para a SE Irecê), originado do seccionamento da Linha de Transmissão 230 kV Senhor do Bonfim II – Irecê na subestação seccionadora Campo Formoso, com 4,4 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV CAMPO FORMOSO /OUROLANDIA II BA | LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA | RB | FT LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/1/2022 | 11/30/2047 | R$93,231.20 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | LT 230 kV CANOINHAS ESU /S.MATEUS SUL SC/PR | LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR | RB | FT LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$753,305.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV CANOINHAS ESU /S.MATEUS SUL SC/PR | LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR | RB | FT LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,322,113.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV CANOINHAS ESU /S.MATEUS SUL SC/PR | LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR | RB | FT LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,119,853.33 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV CARAJAS /INTEGRADORA PA | LT 230 kV CARAJAS /INTEGRADORA C-3 PA | RB | FT LT 230 kV CARAJAS /INTEGRADORA C-3 PA | 058/2001 | IPCA | RBNI | REA 4658/2014 | 9/2/2013 | 12/31/2042 | R$ 1,520,533.81 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de um circuito (C3) de linha de transmissão em 230 kV, circuito duplo, de 83 km de extensão, CAA 954 MCM Rail, um condutor por fase, dois cabos para-raios (um OPGW 24 fibras e outro 3/8”); *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | LT 230 kV CARAJAS /INTEGRADORA PA | LT 230 kV CARAJAS /INTEGRADORA C-2 PA | RB | FT LT 230 kV CARAJAS /INTEGRADORA C-2 PA | 058/2001 | IPCA | RBNI | REA 4658/2014 | 9/2/2013 | 12/31/2042 | R$ 1,520,533.81 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de um circuito (C2) de linha de transmissão em 230 kV, circuito duplo, de 83 km de extensão, CAA 954 MCM Rail, um condutor por fase, dois cabos para-raios (um OPGW 24 fibras e outro 3/8”); *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | LT 230 kV CARAJAS /INTEGRADORA PA | LT 230 kV CARAJAS /INTEGRADORA C-1 PA | RB | FT LT 230 kV CARAJAS /INTEGRADORA C-1 PA | 058/2001 | IPCA | RBNIA | REA 4658/2014 | R$893,143.99 | 6/1/2025 | Prevista | Parcela adicional de RAP para operação e manutenção de linha de transmissão em 230 kV, circuito simples, de 75,3 km de extensão, CAA 636 MCM Grosbeak, um condutor por fase, dois cabos para-raios (um OPGW 24 fibras e outro 3/8”); ATENÇÃO: Esta RAP só será vigente a partir da transferência desta instalação à Eletronorte. | |||||
| AXIA Energia Norte | LT 230 kV CARAJAS /MARABA PA | LT 230 kV CARAJAS /MARABA C-1 PA | RB | FT LT 230 kV CARAJAS /MARABA C-1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,187,100.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV CASCAVEL OEST /CASCAVEL PR | LT 230 kV CASCAVEL OEST /CASCAVEL C-1 PR | RB | FT LT 230 kV CASCAVEL OEST /CASCAVEL C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$187,615.80 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV CASCAVEL OEST /CASCAVEL PR | LT 230 kV CASCAVEL OEST /CASCAVEL C-1 PR | RB | FT LT 230 kV CASCAVEL OEST /CASCAVEL C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$329,281.14 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV CASCAVEL OEST /CASCAVEL PR | LT 230 kV CASCAVEL OEST /CASCAVEL C-1 PR | RB | FT LT 230 kV CASCAVEL OEST /CASCAVEL C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$278,906.87 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV CASTANHAL /SANTA MARIA PA | LT 230 kV CASTANHAL /SANTA MARIA C-2 PA | RB | FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA | 058/2001 | IPCA | RBNI | REA 2152/2009 | 11/19/2012 | 8/25/2048 | R$45,226.02 | 6/1/2025 | Ativa | T2009-161 | Instalação do circuito LT 230 kV CASTANHAL /SANTA MARIA C-2 PA originado do seccionamento do circuito LT 230 kV UTINGA /SANTA MARIA C-1 PA na SE CASTANHAL e acréscimo de 0,3 km de linha. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | LT 230 kV CASTANHAL /SANTA MARIA PA | LT 230 kV CASTANHAL /SANTA MARIA C-2 PA | RB | FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$676,148.90 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV CASTANHAL /SANTA MARIA PA | LT 230 kV CASTANHAL /SANTA MARIA C-2 PA | RB | FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,467,867.70 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV CASTANHAL /SANTA MARIA PA | LT 230 kV CASTANHAL /SANTA MARIA C-2 PA | RB | FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,407,827.54 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV CASTANHAL /SANTA MARIA PA | LT 230 kV CASTANHAL /SANTA MARIA C-2 PA | RB | FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 6/30/2017 | 6/29/2041 | R$19,174.68 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV CATU /CAMACARI IV BA | LT 230 kV CATU /CAMACARI IV C-2 BA | RB | FT LT 230 kV CATU /CAMACARI IV C-2 BA | 061/2001 | IPCA | RBNI | REA 2891/2011 | 11/5/2014 | 11/11/2055 | R$237,008.78 | 6/1/2025 | Ativa | T2010-075 | Remanejar a LT 230 kV Camaçari II/Catu-C2 - para a futura SE Camaçari IV, com a construção de 1,5 km com cabo GROSBEAK 636 MCM. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV CATU /CAMACARI IV BA | LT 230 kV CATU /CAMACARI IV C-2 BA | RB | FT LT 230 kV CATU /CAMACARI IV C-2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$501,956.38 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CATU /CAMACARI IV BA | LT 230 kV CATU /CAMACARI IV C-2 BA | RB | FT LT 230 kV CATU /CAMACARI IV C-2 BA | 061/2001 | IPCA | RBNI | REA 5931/2016 | 5/12/2022 | 2/13/2061 | R$625,034.10 | 6/1/2025 | Ativa | T2016-006 | Recapacitar a LT 230 kV Catu - Camaçari IV C2, com 25 km de extensão, substituindo 10 torres autoportantes, 1 km de cabo 636 MCM, 15 km de cabo pararraios 3/8 e isoladores. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV CATU /CAMACARI IV BA | LT 230 kV CATU /CAMACARI IV C-2 BA | RB | FT LT 230 kV CATU /CAMACARI IV C-2 BA | 061/2001 | IPCA | RBNI | REA 7761/2019 | 11/18/2017 | 11/17/2050 | R$532,376.81 | 6/1/2025 | Ativa | Substituição de 2 Cabos Para-raios. Dotterel e/ou EHS 3/8” (Cada Cabo Para Raios é composto por 25,00 km do Cabo tipo Dotterel) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV CATU /CAMACARI IV BA | LT 230 kV CATU /CAMACARI IV C-2 BA | RB | FT LT 230 kV CATU /CAMACARI IV C-2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/20/2020 | 1/11/2054 | R$184,799.63 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV CATU /CAMACARI IV BA | LT 230 kV CATU /CAMACARI IV C-1 BA | RB | FT LT 230 kV CATU /CAMACARI IV C-1 BA | 061/2001 | IPCA | RBNI | REA 2891/2011 | 10/13/2014 | 10/19/2055 | R$226,793.16 | 6/1/2025 | Ativa | T2010-075 | Remanejar a LT 230 kV Camaçari II/Catu- C1/C2 - para a futura SE Camaçari IV, com a construção de 1,5 km com cabo GROSBEAK 636 MCM. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV CATU /CAMACARI IV BA | LT 230 kV CATU /CAMACARI IV C-1 BA | RB | FT LT 230 kV CATU /CAMACARI IV C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$501,956.38 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CATU /CAMACARI IV BA | LT 230 kV CATU /CAMACARI IV C-1 BA | RB | FT LT 230 kV CATU /CAMACARI IV C-1 BA | 061/2001 | IPCA | RBNI | REA 5931/2016 | 5/12/2022 | 9/3/2056 | R$ 1,184,539.07 | 6/1/2025 | Ativa | T2016-006 | Recapacitar a LT 230 kV Catu - Camaçari IV C1, com 25 km de extensão, substituindo 16 torres autoportantes, 1 km de cabo 636 MCM, 15 km de cabo pararraios 3/8 e isoladores. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV CATU /CAMACARI IV BA | LT 230 kV CATU /CAMACARI IV C-1 BA | RB | FT LT 230 kV CATU /CAMACARI IV C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/19/2022 | 5/28/2058 | R$139,740.07 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV CATU /G.MANGABEIRA BA | LT 230 kV CATU /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV CATU /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RBNI | REA 2173/2009 | 1/6/2023 | 6/15/2060 | R$ 2,489,933.83 | 6/1/2025 | Ativa | T2009-156 | Recapacitar a LT 230 kV Catu / Gov. Mangabeiras com 77,2 km de extensão, um cabo por fase, CAA 636 MCM GROSBEAK, instalando novas estruturas nos vãos e trocando os isoladores por tipo poliméricos. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV CATU /G.MANGABEIRA BA | LT 230 kV CATU /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV CATU /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RBNI | REA 2891/2011 | 11/30/2015 | 1/19/2052 | R$31,187.95 | 6/1/2025 | Ativa | T2010-095 | Realocar a LT 230 kV Catu - Gov. Mangabeira C1 para permitir a instalação de dois novos módulos de entrada de linha e consequente separação, na SE G.Mangabeira dos circuito Camaçari II - Tomba. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV CATU /G.MANGABEIRA BA | LT 230 kV CATU /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV CATU /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,409,128.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CATU /G.MANGABEIRA BA | LT 230 kV CATU /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV CATU /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/8/2023 | 2/4/2059 | R$760,270.51 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV CAUIPE /FORTALEZA II CE | LT 230 kV CAUIPE /FORTALEZA II C-2 CE | RB | FT LT 230 kV CAUIPE /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$835,610.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CAUIPE /FORTALEZA II CE | LT 230 kV CAUIPE /FORTALEZA II C-2 CE | RB | FT LT 230 kV CAUIPE /FORTALEZA II C-2 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/6/2022 | 12/10/2059 | R$151,242.32 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV CAUIPE /FORTALEZA II CE | LT 230 kV CAUIPE /FORTALEZA II C-1 CE | RB | FT LT 230 kV CAUIPE /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$875,950.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CAUIPE /FORTALEZA II CE | LT 230 kV CAUIPE /FORTALEZA II C-1 CE | RB | FT LT 230 kV CAUIPE /FORTALEZA II C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/1/2022 | 10/2/2052 | R$375,543.62 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV CAUIPE /MARACANAU CE | LT 230 kV CAUIPE /MARACANAU C-1 CE | RB | FT LT 230 kV CAUIPE /MARACANAU C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$693,612.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CAUIPE /MARACANAU CE | LT 230 kV CAUIPE /MARACANAU C-1 CE | RB | FT LT 230 kV CAUIPE /MARACANAU C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,946,393.75 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CAUIPE /MARACANAU CE | LT 230 kV CAUIPE /MARACANAU C-1 CE | RB | FT LT 230 kV CAUIPE /MARACANAU C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,794,337.23 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CAUIPE /MARACANAU CE | LT 230 kV CAUIPE /MARACANAU C-1 CE | RB | FT LT 230 kV CAUIPE /MARACANAU C-1 CE | 061/2001 | IPCA | RBNI | DSP 267/2023 | 5/20/2022 | 12/31/2042 | R$20,471.19 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Cauípe -Maracanaú II C1, originado do seccionamento da Linha de Transmissão 230 kV Cauípe - Fortaleza II C3 na Subestação seccionadora Maracanaú II, com 2 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV CAUIPE /MARACANAU CE | LT 230 kV CAUIPE /MARACANAU C-1 CE | RB | FT LT 230 kV CAUIPE /MARACANAU C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/8/2022 | 5/8/2055 | R$550,106.81 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV CAUIPE /SOBRAL II CE | LT 230 kV CAUIPE /SOBRAL II C-1 CE | RB | FT LT 230 kV CAUIPE /SOBRAL II C-1 CE | 061/2001 | IPCA | RBNI | REA 2460/2010 | 11/21/2013 | 2/1/2052 | R$71,071.20 | 6/1/2025 | Ativa | T2009-117 | Reencabeçamento da LT 230 kV Sobral II - Cauípe, na SE Sobral II, devido à instalação do transformador trifásico 230/69 kV - 100 MVA TR4. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV CAUIPE /SOBRAL II CE | LT 230 kV CAUIPE /SOBRAL II C-1 CE | RB | FT LT 230 kV CAUIPE /SOBRAL II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,238,074.99 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CAUIPE /SOBRAL II CE | LT 230 kV CAUIPE /SOBRAL II C-1 CE | RB | FT LT 230 kV CAUIPE /SOBRAL II C-1 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/24/2014 | 11/28/2051 | R$19,027.72 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE CADEIAS DE ISOLADORES DE MESMO TIPO Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV CAUIPE /SOBRAL II CE | LT 230 kV CAUIPE /SOBRAL II C-1 CE | RB | FT LT 230 kV CAUIPE /SOBRAL II C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/12/2021 | 9/9/2058 | R$196,913.07 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | LT 230 kV CAXIAS /CAXIAS SUL 5 RS | LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS | RB | FT LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$390,692.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV CAXIAS II /COELHO NETO MA | LT 230 kV CAXIAS II /COELHO NETO C-1 MA | RB | FT LT 230 kV CAXIAS II /COELHO NETO C-1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,042,675.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV CAXIAS NORTE /CAXIAS SUL 5 RS | LT 230 kV CAXIAS NORTE /CAXIAS SUL 5 C-1 RS | RB | FT LT 230 kV CAXIAS NORTE /CAXIAS SUL 5 C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$85,121.98 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV CAXIAS NORTE /FARROUPILHA RS | LT 230 kV CAXIAS NORTE /FARROUPILHA C-2 RS | RB | FT LT 230 kV CAXIAS NORTE /FARROUPILHA C-2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,833.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CEARA MIRIM II /EXTREMOZ II RN | LT 230 kV CEARA MIRIM II /EXTREMOZ II C-2 RN | RB | FT LT 230 kV CEARA MIRIM II /EXTREMOZ II C-2 RN | 019/2010 | IPCA | RBL | CC 019/2010 | 2/17/2014 | 11/23/2040 | R$ 1,007,594.32 | 6/1/2025 | Ativa | T2010-090-A | Rede Básica e ICGLT, CS, 230 kV Extremoz II - João Câmara; SE Extremoz II 230 kV; SE João Câmara 230/69 kV - 360 MVA (Rede Básica). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | LT 230 kV CEARA MIRIM II /EXTREMOZ II RN | LT 230 kV CEARA MIRIM II /EXTREMOZ II C-2 RN | RB | FT LT 230 kV CEARA MIRIM II /EXTREMOZ II C-2 RN | 019/2010 | IPCA | RBNI | DSP 1169/2022 | 9/17/2014 | 11/22/2040 | R$91,849.11 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Ceará Mirim II - Extremoz II C2, originado do seccionamento da Linha de Transmissão 230 kV João Câmara II – Extremoz II na subestação seccionadora Ceará Mirim II, com 6 km de extensão. | |||
| AXIA Energia Nordeste | LT 230 kV CEARA MIRIM II /EXTREMOZ II RN | LT 230 kV CEARA MIRIM II /EXTREMOZ II C-1 RN | RB | FT LT 230 kV CEARA MIRIM II /EXTREMOZ II C-1 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$994,180.95 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | LT 230 kV CEARA MIRIM II /JOAO CAMARA II RN | LT 230 kV CEARA MIRIM II /JOAO CAMARA II C-1 RN | RB | FT LT 230 kV CEARA MIRIM II /JOAO CAMARA II C-1 RN | 019/2010 | IPCA | RBL | CC 019/2010 | 2/17/2014 | 11/23/2040 | R$ 3,123,542.40 | 6/1/2025 | Ativa | T2010-090-A | Rede Básica e ICGLT, CS, 230 kV Extremoz II - João Câmara; SE Extremoz II 230 kV; SE João Câmara 230/69 kV - 360 MVA (Rede Básica). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | LT 230 kV CEARA MIRIM II /JOAO CAMARA II RN | LT 230 kV CEARA MIRIM II /JOAO CAMARA II C-1 RN | RB | FT LT 230 kV CEARA MIRIM II /JOAO CAMARA II C-1 RN | 019/2010 | IPCA | RBNI | DSP 1169/2022 | 9/17/2014 | 11/22/2040 | R$91,849.11 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, João Câmara II - Ceará Mirim II C1, originado do seccionamento da Linha de Transmissão 230 kV João Câmara II – Extremoz II na subestação seccionadora Ceará Mirim II, com 6 km de extensão. | |||
| Nova Era Integração | LT 230 kV CHAPADA III /CRATO II PI/CE | LT 230 kV CHAPADA III /CRATO II C-1 PI/CE | RB | FT LT 230 kV CHAPADA III /CRATO II C-1 PI/CE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 16,438,237.40 | 6/1/2025 | Prevista | T2024-197-D | LT 230 kV Chapada III - Crato II - C1 | ||||
| Nova Era Catarina | LT 230 kV CHAPECOENSE /XANXERE ESU SC | LT 230 kV CHAPECOENSE /XANXERE ESU C-2 SC | RB | FT LT 230 kV CHAPECOENSE /XANXERE ESU C-2 SC | 012/2024 | IPCA | RBL | CC 012/2024 | R$452,125.54 | 6/1/2025 | Prevista | T2024-201 | - SE 230/138 kV Chapecoense (Pátios de 230 e Transformação 230/138 kV)- Seccionamentos das LTs 230 kV Foz do Chapecó – Xanxerê – C1 e C2 na subestação Chapecoense | ||||
| Nova Era Catarina | LT 230 kV CHAPECOENSE /XANXERE ESU SC | LT 230 kV CHAPECOENSE /XANXERE ESU C-1 SC | RB | FT LT 230 kV CHAPECOENSE /XANXERE ESU C-1 SC | 012/2024 | IPCA | RBL | CC 012/2024 | R$452,125.54 | 6/1/2025 | Prevista | T2024-201 | - SE 230/138 kV Chapecoense (Pátios de 230 e Transformação 230/138 kV)- Seccionamentos das LTs 230 kV Foz do Chapecó – Xanxerê – C1 e C2 na subestação Chapecoense | ||||
| AXIA Energia Nordeste | LT 230 kV CIC. DANTAS /OLINDINA BA | LT 230 kV CIC. DANTAS /OLINDINA C-2 BA | RB | FT LT 230 kV CIC. DANTAS /OLINDINA C-2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,483,965.60 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CIC. DANTAS /OLINDINA BA | LT 230 kV CIC. DANTAS /OLINDINA C-2 BA | RB | FT LT 230 kV CIC. DANTAS /OLINDINA C-2 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 9/24/2017 | 2/3/2075 | R$21,790.62 | 6/1/2025 | Ativa | T2020-050 | Receita resultante do seccionamento do circuito LT 230 kV CIC. DANTAS /ALAGOINHAS II C-1 BA na SE OLINDINA. Receita resultante do seccionamento do circuito LT 230 kV CIC. DANTAS /CATU C-2 BA na SE ALAGOINHAS II . SUBSTITUIÇÃO DA ESTRUTURA 534 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV CIC. DANTAS /OLINDINA BA | LT 230 kV CIC. DANTAS /OLINDINA C-2 BA | RB | FT LT 230 kV CIC. DANTAS /OLINDINA C-2 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/24/2014 | 11/28/2051 | R$5,561.38 | 6/1/2025 | Ativa | T2020-050 | Receita resultante do seccionamento do circuito LT 230 kV CIC. DANTAS /ALAGOINHAS II C-1 BA na SE OLINDINA. Receita resultante do seccionamento do circuito LT 230 kV CIC. DANTAS /CATU C-2 BA na SE ALAGOINHAS II . SUBSTITUIÇÃO DE CADEIAS DE ISOLADORES DE MESMO TIPO Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV CIC. DANTAS /OLINDINA BA | LT 230 kV CIC. DANTAS /OLINDINA C-2 BA | RB | FT LT 230 kV CIC. DANTAS /OLINDINA C-2 BA | 061/2001 | IPCA | RBNI | DSP 625/2024 | 5/19/2023 | 5/18/2057 | R$2,334.06 | 6/1/2025 | Ativa | T2020-050 | Receita resultante do seccionamento do circuito LT 230 kV CIC. DANTAS /ALAGOINHAS II C-1 BA na SE OLINDINA. Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Cícero Dantas -Alagoinhas II C1, originado do seccionamento da Linha de Transmissão 230 kV Cícero Dantas - Catu C2 na Subestação seccionadora Alagoinhas II, com 0,3 km de extensão. | ||
| AXIA Energia Nordeste | LT 230 kV CIC. DANTAS /OLINDINA BA | LT 230 kV CIC. DANTAS /OLINDINA C-2 BA | RB | FT LT 230 kV CIC. DANTAS /OLINDINA C-2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/16/2022 | 7/20/2059 | R$211,006.19 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV CIC. DANTAS /OLINDINA BA | LT 230 kV CIC. DANTAS /OLINDINA C-1 BA | RB | FT LT 230 kV CIC. DANTAS /OLINDINA C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,465,347.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CIC. DANTAS /OLINDINA BA | LT 230 kV CIC. DANTAS /OLINDINA C-1 BA | RB | FT LT 230 kV CIC. DANTAS /OLINDINA C-1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 10/1/2017 | 2/10/2075 | R$21,588.49 | 6/1/2025 | Ativa | T2020-050 | Receita resultante do seccionamento do circuito LT 230 kV CIC. DANTAS /CATU C-1 BA na SE OLINDINA. SUBSTITUIÇÃO DA ESTRUTURA 520 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV CIC. DANTAS /OLINDINA BA | LT 230 kV CIC. DANTAS /OLINDINA C-1 BA | RB | FT LT 230 kV CIC. DANTAS /OLINDINA C-1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/24/2014 | 11/28/2051 | R$1,001.45 | 6/1/2025 | Ativa | T2020-050 | Receita resultante do seccionamento do circuito LT 230 kV CIC. DANTAS /CATU C-1 BA na SE OLINDINA. SUBSTITUIÇÃO DE CADEIAS DE ISOLADORES DE MESMO TIPO Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV CIC. DANTAS /OLINDINA BA | LT 230 kV CIC. DANTAS /OLINDINA C-1 BA | RB | FT LT 230 kV CIC. DANTAS /OLINDINA C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/19/2014 | 7/6/2048 | R$ 2,159,409.65 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | LT 230 kV COELHO NETO /TERESINA MA/PI | LT 230 kV COELHO NETO /TERESINA C-1 MA/PI | RB | FT LT 230 kV COELHO NETO /TERESINA C-1 MA/PI | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,806,389.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV COLETORA PORTO VELHO /PORTO VELHO RO | LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO | RB | FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO | 010/2009 | IPCA | RBL | CC 010/2009 | 11/15/2011 | 2/26/2039 | R$612,721.85 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Norte | LT 230 kV COLETORA PORTO VELHO /PORTO VELHO RO | LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO | RB | FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO | 010/2009 | IPCA | RBL | CC 010/2009 | 11/15/2011 | 2/26/2039 | R$612,721.85 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Nordeste | LT 230 kV COTEGIPE /JACARACANGA BA | LT 230 kV COTEGIPE /JACARACANGA C-1 BA | RB | FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA | 061/2001 | IPCA | RBNI | REA 3208/2011 | 9/26/2021 | 11/25/2057 | R$814,756.82 | 6/1/2025 | Ativa | T2011-029 | Racapacitar o circuito 1 da LT 230 kV Jacaranga / Cotegipe, com 16 km de extensão, de 251 MVA para 517 MVA por meio da troca de cabos condutores e cabos pára-raios e equipamentos associados. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV COTEGIPE /JACARACANGA BA | LT 230 kV COTEGIPE /JACARACANGA C-1 BA | RB | FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$305,189.48 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV COTEGIPE /JACARACANGA BA | LT 230 kV COTEGIPE /JACARACANGA C-1 BA | RB | FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/20/2015 | 4/7/2049 | R$299,162.04 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DA ESTRUTURA 26.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV COTEGIPE /JACARACANGA BA | LT 230 kV COTEGIPE /JACARACANGA C-1 BA | RB | FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/11/2018 | 2/19/2055 | R$ 3,117,589.07 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV COTEGIPE /MATATU BA | LT 230 kV COTEGIPE /MATATU C-1 BA | RB | FT LT 230 kV COTEGIPE /MATATU C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$602,347.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV COTEGIPE /MATATU BA | LT 230 kV COTEGIPE /MATATU C-1 BA | RB | FT LT 230 kV COTEGIPE /MATATU C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,690,289.31 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV COTEGIPE /MATATU BA | LT 230 kV COTEGIPE /MATATU C-1 BA | RB | FT LT 230 kV COTEGIPE /MATATU C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/9/2019 | 7/9/2051 | R$873,704.00 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV COTEMINAS /LAGOA DO CARRO PB/PE | LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE | RB | FT LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,307,558.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV COTEMINAS /LAGOA DO CARRO PB/PE | LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE | RB | FT LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,669,229.98 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV COTEMINAS /LAGOA DO CARRO PB/PE | LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE | RB | FT LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 3,382,581.73 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV COTEMINAS /LAGOA DO CARRO PB/PE | LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE | RB | FT LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE | 061/2001 | IPCA | RBNI | REA 9687/2021 | 10/22/2020 | 12/31/2042 | R$85,625.95 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trechos de linha de transmissão em 230 kV, circuito duplo, entre o ponto de seccionamento da Linha de Transmissão 230 kV Pau Ferro – Coteminas na Subestação Lagoa do Carro, com 11 Km de extensão cada. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | LT 230 kV COXIPO /NOBRES MT | LT 230 kV COXIPO /NOBRES C-1 MT | RB | FT LT 230 kV COXIPO /NOBRES C-1 MT | 058/2001 | IPCA | RBNI | REA 2384/2010 | 12/20/2012 | 12/24/2049 | R$59,373.06 | 6/1/2025 | Ativa | T2009-145 | Recapacitação por meio de retensionamento de 105 km, circuito simples, 1x795 kcmil, da linha de transmissão existente. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | LT 230 kV COXIPO /NOBRES MT | LT 230 kV COXIPO /NOBRES C-1 MT | RB | FT LT 230 kV COXIPO /NOBRES C-1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,445,474.51 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV COXIPO /NOBRES MT | LT 230 kV COXIPO /NOBRES C-1 MT | RB | FT LT 230 kV COXIPO /NOBRES C-1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 5,308,938.68 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV COXIPO /NOBRES MT | LT 230 kV COXIPO /NOBRES C-1 MT | RB | FT LT 230 kV COXIPO /NOBRES C-1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 5,091,787.27 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV CRATO II /TAUA II CE | LT 230 kV CRATO II /TAUA II C-1 CE | RB | FT LT 230 kV CRATO II /TAUA II C-1 CE | 007/2005 | IGPM | RBL | CC 007/2005 | 12/28/2007 | 3/4/2035 | R$ 7,510,436.20 | 6/1/2025 | Ativa | Contrato de Concessão nº 007/2005 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | LT 230 kV CURITIBA /JOINV.NORTE PR/SC | LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC | RB | FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,521,772.61 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV CURITIBA /JOINV.NORTE PR/SC | LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC | RB | FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,670,835.89 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV CURITIBA /JOINVILLE PR/SC | LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC | RB | FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,574,519.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV CURITIBA /JOINVILLE PR/SC | LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC | RB | FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,763,411.56 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV CURITIBA /S.MATEUS SUL PR | LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR | RB | FT LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,842,993.60 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV CURITIBA /S.MATEUS SUL PR | LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR | RB | FT LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,234,605.11 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV CURITIBA /S.MATEUS SUL PR | LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR | RB | FT LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,739,766.95 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV DELM. GOUVEIA /FORTALEZA II CE | LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE | RB | FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$122,748.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV DELM. GOUVEIA /FORTALEZA II CE | LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE | RB | FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$344,452.42 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV DELM. GOUVEIA /FORTALEZA II CE | LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE | RB | FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$317,543.05 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV DELM. GOUVEIA /FORTALEZA II CE | LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE | RB | FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$122,748.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV DELM. GOUVEIA /FORTALEZA II CE | LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE | RB | FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$344,452.42 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV DELM. GOUVEIA /FORTALEZA II CE | LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE | RB | FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$317,543.05 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV DELM. GOUVEIA /FORTALEZA II CE | LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE | RB | FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/17/2021 | 5/16/2054 | R$146,872.03 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | LT 230 kV DOURADOS /GUAIRA MS/PR | LT 230 kV DOURADOS /GUAIRA C-1 MS/PR | RB | FT LT 230 kV DOURADOS /GUAIRA C-1 MS/PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,577,018.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV DOURADOS /GUAIRA MS/PR | LT 230 kV DOURADOS /GUAIRA C-1 MS/PR | RB | FT LT 230 kV DOURADOS /GUAIRA C-1 MS/PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,277,961.07 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV DOURADOS /GUAIRA MS/PR | LT 230 kV DOURADOS /GUAIRA C-1 MS/PR | RB | FT LT 230 kV DOURADOS /GUAIRA C-1 MS/PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 5,317,542.53 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV DOURADOS /GUAIRA MS/PR | LT 230 kV DOURADOS /GUAIRA C-1 MS/PR | RB | FT LT 230 kV DOURADOS /GUAIRA C-1 MS/PR | 057/2001 | IPCA | RMEL | REN 905/2020 | 3/24/2021 | 9/19/2057 | R$74,424.31 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV EUNAPOLIS /TEIX. FREITAS II BA | LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-2 BA | RB | FT LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-2 BA | 018/2009 | IPCA | RBL | CC 018/2009 | 8/3/2009 | 8/3/2039 | R$ 9,617,995.48 | 6/1/2025 | Ativa | T2009-224 | Contrato de Concessão nº018/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Nordeste | LT 230 kV EUNAPOLIS /TEIX. FREITAS II BA | LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-1 BA | RB | FT LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-1 BA | 014/2008 | IPCA | RBL | CC 014/2008 | 10/16/2008 | 10/16/2038 | R$ 3,863,074.65 | 6/1/2025 | Ativa | T2000-256 | Contrato de Concessão nº 014/2008 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Nordeste | LT 230 kV EXTREMOZ II /NATAL III RN | LT 230 kV EXTREMOZ II /NATAL III C-2 RN | RB | FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,096,635.09 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV EXTREMOZ II /NATAL III RN | LT 230 kV EXTREMOZ II /NATAL III C-2 RN | RB | FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,077,343.37 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV EXTREMOZ II /NATAL III RN | LT 230 kV EXTREMOZ II /NATAL III C-2 RN | RB | FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,836,934.60 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV EXTREMOZ II /NATAL III RN | LT 230 kV EXTREMOZ II /NATAL III C-2 RN | RB | FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN | 061/2001 | IPCA | RBNI | REA 3208/2011 | 1/6/2020 | 1/9/2057 | R$ 1,584,331.25 | 6/1/2025 | Ativa | T2011-151 | Implantar o circuito 2 da LT 230 kV Extremoz II / Natal III originado do seccionamento do circuito 2 da LT 230 kV Campina Grande II / Natal III. (Nova configuração: Instalar o circuito LT 230 kV EXTREMOZ II /NATAL III C-1 RN originado do seccionamento do circuito LT 230 kV C.GRANDE III /NATAL III C-1 PB/RN na SE EXTREMOZ II). *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV EXTREMOZ II /NATAL III RN | LT 230 kV EXTREMOZ II /NATAL III C-2 RN | RB | FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN | 061/2001 | IPCA | RBNI | DSP 1073/2022 | 6/4/2021 | 12/31/2042 | R$10,873.78 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Campina Grande II -Natal III C2, originado do seccionamento da Linha de Transmissão 230 kV Campina Grande II - Natal II C2, e a subestação seccionadora Natal III, com 1 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV EXTREMOZ II /NATAL III RN | LT 230 kV EXTREMOZ II /NATAL III C-1 RN | RB | FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$28,829.48 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV EXTREMOZ II /NATAL III RN | LT 230 kV EXTREMOZ II /NATAL III C-1 RN | RB | FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$80,900.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV EXTREMOZ II /NATAL III RN | LT 230 kV EXTREMOZ II /NATAL III C-1 RN | RB | FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$74,580.27 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV EXTREMOZ II /NATAL III RN | LT 230 kV EXTREMOZ II /NATAL III C-1 RN | RB | FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN | 061/2001 | IPCA | RBNI | REA 10141/2021 | 8/15/2016 | 12/31/2042 | R$94,997.20 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 230 kV, circuito simples, entre o ponto de seccionamento da linha de transmissão 230 kV Campina Grande II - Natal III e a subestação seccionadora Extremoz II, com 16,5 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV EXTREMOZ II /NATAL III RN | LT 230 kV EXTREMOZ II /NATAL III C-1 RN | RB | FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN | 061/2001 | IPCA | RBNI | DSP 1073/2022 | 6/4/2021 | 12/31/2042 | R$10,873.78 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Campina Grande II -Natal III C1, originado do seccionamento da Linha de Transmissão 230 kV Campina Grande II - Natal II C1, e a subestação seccionadora Natal III, com 1 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | LT 230 kV FARROUPILHA /MONTE CLARO RS | LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS | RB | FT LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$489,569.85 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV FARROUPILHA /MONTE CLARO RS | LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS | RB | FT LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$488,938.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV FARROUPILHA /MONTE CLARO RS | LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS | RB | FT LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS | 057/2001 | IPCA | RMEL | REA 7759/2019 | 3/9/2020 | 9/25/2056 | R$164,267.89 | 6/1/2025 | Ativa | T2019-010 | Adequação na LT 230 kV Farroupilha / Monte Claro C-1, com a substituição de fundações metálicas e cabos contrapeso de 16 torres. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA BA | LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$669,138.06 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA BA | LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,877,714.46 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA BA | LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RBNI | REA 2891/2011 | 11/30/2015 | 10/2/2052 | R$54,139.17 | 6/1/2025 | Ativa | T2018-073 | Receita resultante do seccionamento do circuito LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA na SE FEIRA DE SANTANA III . Complementar o segundo circuito da LT 230 kV Camaçari II - Gov. Mangabeira, para separar este do circuito sob responsabilidade da Afluente. *(Inclui alterações estabelecidas pela Lei 12.783/2013).*(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA BA | LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RBNI | DSP 337/2023 | 9/26/2022 | 12/31/2042 | R$356,927.86 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Governador Mangabeira -Feira de Santana III C1, originado do seccionamento da Linha de Transmissão 230 kV Governador Mangabeira - Camaçari II C2 na Subestação seccionadora Feira de Santana III, com 54,17 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA BA | LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-1 BA | RB | FT LT 230 kV FEIRA DE SANTANA III /G.MANGABEIRA C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/25/2022 | 12/29/2059 | R$95,703.98 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV FLORESTA II /BOM NOME PE | LT 230 kV FLORESTA II /BOM NOME C-2 PE | RB | FT LT 230 kV FLORESTA II /BOM NOME C-2 PE | 061/2001 | IPCA | RBNIA | DSP 2563/2023 | R$138,193.83 | 6/1/2025 | Prevista | T2023-129 | Instalar o circuito LT 230 kV FLORESTA II /BOM NOME C-3 PE originado do seccionamento do circuito LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE na SE FLORESTA II | ||||
| AXIA Energia Nordeste | LT 230 kV FLORESTA II /BOM NOME PE | LT 230 kV FLORESTA II /BOM NOME C-1 PE | RB | FT LT 230 kV FLORESTA II /BOM NOME C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,678,443.82 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV FLORESTA II /BOM NOME PE | LT 230 kV FLORESTA II /BOM NOME C-1 PE | RB | FT LT 230 kV FLORESTA II /BOM NOME C-1 PE | 061/2001 | IPCA | RBNI | REA 10264/2021 | 4/5/2019 | 12/31/2042 | R$2,711.75 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de um trecho de LT em 230 kV entre o ponto de seccionamento da Linha de Transmissão 230 kV Paulo Afonso III – Bom Nome C-2 e a Subestação seccionadora Floresta II, com 0,3 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | LT 230 kV FORQUILHINHA /L.GRANDE SC/RS | LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS | RB | FT LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$216,452.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV FORQUILHINHA /L.GRANDE SC/RS | LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS | RB | FT LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS | 057/2001 | IPCA | RMEL | REN 643/2014 | 3/21/2016 | 3/20/2044 | R$9,935.66 | 6/1/2025 | Ativa | Substituição de torres de transmissão (Torres Nº 135, 136 e 137) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | LT 230 kV FORQUILHINHA /SIDEROPOL.ESU SC | LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC | RB | FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$216,452.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV FORTALEZA /FORTALEZA II CE | LT 230 kV FORTALEZA /FORTALEZA II C-3 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$7,118.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV FORTALEZA /FORTALEZA II CE | LT 230 kV FORTALEZA /FORTALEZA II C-2 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$7,118.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV FORTALEZA /FORTALEZA II CE | LT 230 kV FORTALEZA /FORTALEZA II C-1 CE | RB | FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$7,118.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV FORTALEZA II /PICI II CE | LT 230 kV FORTALEZA II /PICI II C-2 CE | RB | FT LT 230 kV FORTALEZA II /PICI II C-2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$435,814.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV FORTALEZA II /PICI II CE | LT 230 kV FORTALEZA II /PICI II C-2 CE | RB | FT LT 230 kV FORTALEZA II /PICI II C-2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,222,967.81 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV FORTALEZA II /PICI II CE | LT 230 kV FORTALEZA II /PICI II C-2 CE | RB | FT LT 230 kV FORTALEZA II /PICI II C-2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,127,426.90 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV FORTALEZA II /PICI II CE | LT 230 kV FORTALEZA II /PICI II C-2 CE | RB | FT LT 230 kV FORTALEZA II /PICI II C-2 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/31/2017 | 9/4/2054 | R$28,052.27 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV FORTALEZA II /PICI II CE | LT 230 kV FORTALEZA II /PICI II C-1 CE | RB | FT LT 230 kV FORTALEZA II /PICI II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$435,814.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV FORTALEZA II /PICI II CE | LT 230 kV FORTALEZA II /PICI II C-1 CE | RB | FT LT 230 kV FORTALEZA II /PICI II C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,222,967.81 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV FORTALEZA II /PICI II CE | LT 230 kV FORTALEZA II /PICI II C-1 CE | RB | FT LT 230 kV FORTALEZA II /PICI II C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,127,426.90 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV FORTALEZA II /PICI II CE | LT 230 kV FORTALEZA II /PICI II C-1 CE | RB | FT LT 230 kV FORTALEZA II /PICI II C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/3/2020 | 4/9/2054 | R$302,472.57 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| Nova Era Catarina | LT 230 kV FOZ DO CHAPECO /CHAPECOENSE RS/SC | LT 230 kV FOZ DO CHAPECO /CHAPECOENSE C-2 RS/SC | RB | FT LT 230 kV FOZ DO CHAPECO /CHAPECOENSE C-2 RS/SC | 012/2024 | IPCA | RBL | CC 012/2024 | R$452,125.54 | 6/1/2025 | Prevista | T2024-201 | - SE 230/138 kV Chapecoense (Pátios de 230 e Transformação 230/138 kV)- Seccionamentos das LTs 230 kV Foz do Chapecó – Xanxerê – C1 e C2 na subestação Chapecoense | ||||
| Nova Era Catarina | LT 230 kV FOZ DO CHAPECO /CHAPECOENSE RS/SC | LT 230 kV FOZ DO CHAPECO /CHAPECOENSE C-1 RS/SC | RB | FT LT 230 kV FOZ DO CHAPECO /CHAPECOENSE C-1 RS/SC | 012/2024 | IPCA | RBL | CC 012/2024 | R$452,125.54 | 6/1/2025 | Prevista | T2024-201 | - SE 230/138 kV Chapecoense (Pátios de 230 e Transformação 230/138 kV)- Seccionamentos das LTs 230 kV Foz do Chapecó – Xanxerê – C1 e C2 na subestação Chapecoense | ||||
| AXIA Energia Sul | LT 230 kV FOZ DO CHAPECO /GUARITA RS | LT 230 kV FOZ DO CHAPECO /GUARITA C-1 RS | RB | FT LT 230 kV FOZ DO CHAPECO /GUARITA C-1 RS | 002/2011 | IPCA | RBNI | REA 6427/2017 | 10/28/2016 | 6/15/2041 | R$969,177.63 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de linha que foi transferida à Eletrosul após a SE Foz do Chapecó integrar a Rede Básica *(Receita revisada em 21/06/2021) | |||
| AXIA Energia Sul | LT 230 kV FOZ DO CHAPECO /PINHALZINHO RS/SC | LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-2 RS/SC | RB | FT LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-2 RS/SC | 007/2014 | IPCA | RBL | CC 007/2014 | 2/28/2018 | 1/29/2044 | R$ 2,042,428.82 | 6/1/2025 | Ativa | T2014-021-C | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | LT 230 kV FOZ DO CHAPECO /PINHALZINHO RS/SC | LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-1 RS/SC | RB | FT LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-1 RS/SC | 007/2014 | IPCA | RBL | CC 007/2014 | 2/28/2018 | 1/29/2044 | R$ 2,042,428.83 | 6/1/2025 | Ativa | T2014-021-B | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | LT 230 kV FOZ DO CHAPECO /XANXERE ESU RS/SC | LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-2 RS/SC | RB | FT LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-2 RS/SC | 002/2011 | IPCA | RBNI | REA 6454/2017 | 6/16/2016 | 6/15/2041 | R$ 1,442,698.74 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção do C2 de linha de transmissão em 230 kV, Foz do Chapecó - Xanxerê, com 77,69 km de extensão, com dois cabos condutores por fase 636 MCM, cabo pararraio convencional EAR 3/8” e cabo OPGW 24 fibras *(Receita revisada em 21/06/2021) | |||
| AXIA Energia Sul | LT 230 kV FOZ DO CHAPECO /XANXERE ESU RS/SC | LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-1 RS/SC | RB | FT LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-1 RS/SC | 002/2011 | IPCA | RBNI | REA 6454/2017 | 6/16/2016 | 6/15/2041 | R$ 1,442,698.74 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção do C1 de linha de transmissão em 230 kV, Foz do Chapecó - Xanxerê, com 77,69 km de extensão, com dois cabos condutores por fase 636 MCM, cabo pararraio convencional EAR 3/8” e cabo OPGW 24 fibras *(Receita revisada em 21/06/2021) | |||
| AXIA Energia Nordeste | LT 230 kV FUNIL /ITABUNA III BA | LT 230 kV FUNIL /ITABUNA III C-1 BA | RB | FT LT 230 kV FUNIL /ITABUNA III C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$981,121.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV FUNIL /ITABUNA III BA | LT 230 kV FUNIL /ITABUNA III C-1 BA | RB | FT LT 230 kV FUNIL /ITABUNA III C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,753,193.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV FUNIL /ITABUNA III BA | LT 230 kV FUNIL /ITABUNA III C-1 BA | RB | FT LT 230 kV FUNIL /ITABUNA III C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,538,108.15 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV FUNIL /ITABUNA III BA | LT 230 kV FUNIL /ITABUNA III C-1 BA | RB | FT LT 230 kV FUNIL /ITABUNA III C-1 BA | 061/2001 | IPCA | RBNI | DSP 1270/2022 | 4/5/2022 | 12/31/2042 | R$185,405.21 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Funil -Itabuna III C1, originado do seccionamento da Linha de Transmissão 230 kV Funil - Itapebi C2, e a subestação seccionadora Itabuna III, com 25 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV FUNIL /ITABUNA III BA | LT 230 kV FUNIL /ITABUNA III C-1 BA | RB | FT LT 230 kV FUNIL /ITABUNA III C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/12/2021 | 12/16/2058 | R$107,721.03 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV FUNIL /ITAPEBI BA | LT 230 kV FUNIL /ITAPEBI C-1 BA | RB | FT LT 230 kV FUNIL /ITAPEBI C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,854,041.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV FUNIL /ITAPEBI BA | LT 230 kV FUNIL /ITAPEBI C-1 BA | RB | FT LT 230 kV FUNIL /ITAPEBI C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 8,008,923.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV FUNIL /ITAPEBI BA | LT 230 kV FUNIL /ITAPEBI C-1 BA | RB | FT LT 230 kV FUNIL /ITAPEBI C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 7,383,248.53 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV FUNIL /ITAPEBI BA | LT 230 kV FUNIL /ITAPEBI C-1 BA | RB | FT LT 230 kV FUNIL /ITAPEBI C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/12/2021 | 12/16/2058 | R$110,031.31 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV G.MANGABEIRA /SAPEACU BA | LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA | RB | FT LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$358,159.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV G.MANGABEIRA /SAPEACU BA | LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA | RB | FT LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,005,057.18 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV G.MANGABEIRA /SAPEACU BA | LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA | RB | FT LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$356,575.12 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV G.MANGABEIRA /SAPEACU BA | LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA | RB | FT LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,000,610.02 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV G.MANGABEIRA /SAPEACU BA | LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA | RB | FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$471,839.00 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV G.MANGABEIRA /SAPEACU BA | LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA | RB | FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA | 061/2001 | IPCA | RBNI | REA 7977/2019 | 10/22/2021 | 12/1/2054 | R$781,896.69 | 6/1/2025 | Ativa | T2019-033 | Recapacitação da LT 230 kV Governador Mangabeira - Sapeaçu da capacidade de curta duração de 675 A para 769 A, para eliminação de Fator Limitante Ativo (altura de segurança). *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV GARANHUNS II /ANGELIM PE | LT 230 kV GARANHUNS II /ANGELIM C-3 PE | RB | FT LT 230 kV GARANHUNS II /ANGELIM C-3 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$292,047.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV GARANHUNS II /ANGELIM PE | LT 230 kV GARANHUNS II /ANGELIM C-2 PE | RB | FT LT 230 kV GARANHUNS II /ANGELIM C-2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$216,106.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV GARANHUNS II /ANGELIM PE | LT 230 kV GARANHUNS II /ANGELIM C-2 PE | RB | FT LT 230 kV GARANHUNS II /ANGELIM C-2 PE | 061/2001 | IPCA | RBNI | REA 5824/2016 | 9/16/2019 | 5/25/2055 | R$100,194.19 | 6/1/2025 | Ativa | T2015-075 | Aumento do limite de curta duração de 437 A para 621 A, pela eliminação de fator limitante ativo (restauração da altura mínima de segurança). *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV GARANHUNS II /ANGELIM PE | LT 230 kV GARANHUNS II /ANGELIM C-1 PE | RB | FT LT 230 kV GARANHUNS II /ANGELIM C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$216,106.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV GARANHUNS II /ANGELIM PE | LT 230 kV GARANHUNS II /ANGELIM C-1 PE | RB | FT LT 230 kV GARANHUNS II /ANGELIM C-1 PE | 061/2001 | IPCA | RBNI | REA 5824/2016 | 9/16/2019 | 1/26/2053 | R$207,546.90 | 6/1/2025 | Ativa | T2015-075 | Aumento do limite de curta duração de 437 A para 621 A, pela eliminação de fator limitante ativo (restauração da altura mínima de segurança). *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV GARANHUNS II /ANGELIM PE | LT 230 kV GARANHUNS II /ANGELIM C-1 PE | RB | FT LT 230 kV GARANHUNS II /ANGELIM C-1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/24/2022 | 9/28/2059 | R$240,448.31 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | LT 230 kV GASPAR 2 /BLUMENAU SC | LT 230 kV GASPAR 2 /BLUMENAU C-2 SC | RB | FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$205,461.41 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV GASPAR 2 /BLUMENAU SC | LT 230 kV GASPAR 2 /BLUMENAU C-2 SC | RB | FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC | 057/2001 | IPCA | RBNI | REA 4802/2014 | 9/30/2016 | 8/7/2065 | R$641,739.58 | 6/1/2025 | Ativa | T2014-058 | Instalação da Linha de Transmissão 230 kV Gaspar II - Blumenau, em circuito duplo, originada do seccionamento da Linha de Transmissão 230 kV Palhoça - Blumenau. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | LT 230 kV GASPAR 2 /BLUMENAU SC | LT 230 kV GASPAR 2 /BLUMENAU C-2 SC | RB | FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$360,601.65 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV GASPAR 2 /BLUMENAU SC | LT 230 kV GASPAR 2 /BLUMENAU C-1 SC | RB | FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$173,718.33 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV GASPAR 2 /BLUMENAU SC | LT 230 kV GASPAR 2 /BLUMENAU C-1 SC | RB | FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$304,889.94 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV GASPAR 2 /BLUMENAU SC | LT 230 kV GASPAR 2 /BLUMENAU C-1 SC | RB | FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC | 057/2001 | IPCA | RBNI | REA 7009/2018 | 1/22/2016 | 12/31/2042 | R$13,726.49 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de um trecho de 2,5 km de linha de transmissão em 230 kV, circuito duplo, entre o ponto de seccionamento da linha de transmissão 230 kV Blumenau - Biguaçu e a subestação seccionadora Gaspar 2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | LT 230 kV GASPAR 2 /PALHOCA ESU SC | LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC | RB | FT LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,909,164.49 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV GASPAR 2 /PALHOCA ESU SC | LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC | RB | FT LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC | 057/2001 | IPCA | RBNI | REA 4802/2014 | 9/30/2016 | 4/15/2045 | R$101,678.52 | 6/1/2025 | Ativa | T2014-058 | Instalação da Linha de Transmissão 230 kV Palhoça - Gaspar II, em circuito duplo, originada do seccionamento da Linha de Transmissão 230 kV Palhoça - Blumenau. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | LT 230 kV GASPAR 2 /PALHOCA ESU SC | LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC | RB | FT LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,350,740.46 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV GOIANINHA /C.GRANDE II PE/PB | LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,812,518.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV GOIANINHA /C.GRANDE II PE/PB | LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RBNI | REA 5745/2016 | 10/21/2021 | 5/18/2057 | R$ 1,460,152.70 | 6/1/2025 | Ativa | T2016-019 | Recapacitação do 1° circuito da LT 230 kV GOIANINHA /C.GRANDE II PE/PB, com extensão de 99,3 km, em circuito simples. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV GOIANINHA /C.GRANDE II PE/PB | LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RBNI | DSP 386/2021 | 11/16/2021 | 11/15/2054 | R$542,403.35 | 6/1/2025 | Ativa | Substituição do cabo para-raio existente por Dotterel nas saídas das subestações por, no mínimo, 8,25 km de distância e substituição por cabos EHS 3/8” no trecho intermediário da LT por uma extensão de até 82,70 km. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV GOIANINHA /C.GRANDE II PE/PB | LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/25/2021 | 5/15/2055 | R$ 1,043,382.84 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV GOIANINHA /JOAO PESSOA II PE/PB | LT 230 kV GOIANINHA /JOAO PESSOA II C-2 PE/PB | RB | FT LT 230 kV GOIANINHA /JOAO PESSOA II C-2 PE/PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$669,487.97 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV GOIANINHA /JOAO PESSOA II PE/PB | LT 230 kV GOIANINHA /JOAO PESSOA II C-2 PE/PB | RB | FT LT 230 kV GOIANINHA /JOAO PESSOA II C-2 PE/PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,878,696.37 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV GOIANINHA /JOAO PESSOA II PE/PB | LT 230 kV GOIANINHA /JOAO PESSOA II C-2 PE/PB | RB | FT LT 230 kV GOIANINHA /JOAO PESSOA II C-2 PE/PB | 061/2001 | IPCA | RBNI | DSP 420/2023 | 9/26/2022 | 12/31/2042 | R$3,452.70 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Goianinha -João Pessoa II CN3, originado do seccionamento da Linha de Transmissão 230 kV Goianinha - Mussuré II C1 na Subestação seccionadora João Pessoa II, com 483 m de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV GOIANINHA /JOAO PESSOA II PE/PB | LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB | RB | FT LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$507,815.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV GOIANINHA /JOAO PESSOA II PE/PB | LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB | RB | FT LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,425,017.37 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV GOIANINHA /JOAO PESSOA II PE/PB | LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB | RB | FT LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB | 061/2001 | IPCA | RBNI | DSP 420/2023 | 9/26/2022 | 12/31/2042 | R$2,816.48 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Goianinha -João Pessoa II CN2, originado do seccionamento da Linha de Transmissão 230 kV Goianinha - Santa Rita II C1 na Subestação seccionadora João Pessoa II, com 394 m de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV GOIANINHA /JOAO PESSOA II PE/PB | LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB | RB | FT LT 230 kV GOIANINHA /JOAO PESSOA II C-1 PE/PB | 061/2001 | IPCA | RBNI | REA 10199/2021 | 5/17/2021 | 12/31/2042 | R$51,591.13 | 6/1/2025 | Ativa | Receita resultante do seccionamento do circuito LT 230 kV GOIANINHA /SANTA RITA II C-1 PE/PB na SE JOAO PESSOA II. Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 230 kV, circuito duplo, Goianinha-Santa Rita II, originado do seccionamento da linha de transmissão 230 kV Goianinha - Mussuré II C1 na subestação seccionadora Santa Rita II, com 12,49 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | LT 230 kV GRAVATAI 2 /GRAVATAI 3 RS | LT 230 kV GRAVATAI 2 /GRAVATAI 3 C-1 RS | RB | FT LT 230 kV GRAVATAI 2 /GRAVATAI 3 C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$43,934.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV GUAMA /MARITUBA PA | LT 230 kV GUAMA /MARITUBA C-2 PA | RB | FT LT 230 kV GUAMA /MARITUBA C-2 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$246,492.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV GUAMA /MARITUBA PA | LT 230 kV GUAMA /MARITUBA C-2 PA | RB | FT LT 230 kV GUAMA /MARITUBA C-2 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$535,116.69 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV GUAMA /MARITUBA PA | LT 230 kV GUAMA /MARITUBA C-1 PA | RB | FT LT 230 kV GUAMA /MARITUBA C-1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$246,492.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV GUAMA /MARITUBA PA | LT 230 kV GUAMA /MARITUBA C-1 PA | RB | FT LT 230 kV GUAMA /MARITUBA C-1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$535,116.69 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV GUARAPUAVA OESTE /IRATI NORTE PR | LT 230 kV GUARAPUAVA OESTE /IRATI NORTE C-1 PR | RB | FT LT 230 kV GUARAPUAVA OESTE /IRATI NORTE C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,736,031.61 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV GUARAPUAVA OESTE /IRATI NORTE PR | LT 230 kV GUARAPUAVA OESTE /IRATI NORTE C-1 PR | RB | FT LT 230 kV GUARAPUAVA OESTE /IRATI NORTE C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,046,878.04 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV GUARAPUAVA OESTE /IRATI NORTE PR | LT 230 kV GUARAPUAVA OESTE /IRATI NORTE C-1 PR | RB | FT LT 230 kV GUARAPUAVA OESTE /IRATI NORTE C-1 PR | 057/2001 | IPCA | RBNI | DSP 1281/2022 | 4/18/2022 | 12/31/2042 | R$12,725.53 | 6/1/2025 | Ativa | T2018-012-F | Receita resultante do seccionamento do circuito LT 230 kV GUARAPUAVA OESTE /PONTA GROSSA C-1 PR na SE IRATI NORTE. Receita resultante do seccionamento do circuito LT 230 kV AREIA /PONTA GROSSA C-1 PR na SE GUARAPUAVA OESTE . Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Areia -Ponta Grossa C1, originado do seccionamento da Linha de Transmissão 230 kV Areia - Ponta Grossa Norte C1, e a Subestação seccionadora Ponta Grossa, com 2,83 km de extensão. (Após o secc., a data desvinculou e precisou ser corrigida para 30/06/2056, data original) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | LT 230 kV GUARAPUAVA OESTE /IRATI NORTE PR | LT 230 kV GUARAPUAVA OESTE /IRATI NORTE C-1 PR | RB | FT LT 230 kV GUARAPUAVA OESTE /IRATI NORTE C-1 PR | 057/2001 | IPCA | RBNI | DSP 695/2024 | 7/3/2023 | 7/2/2057 | R$26,129.95 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Guarapuava Oeste – Irati Norte C1, originado do seccionamento da Linha de Transmissão 230 kV Areia - Ponta Grossa Norte C1, e a Subestação seccionadora Irati Norte, com 1,69 km de extensão. | |||
| AXIA Energia Sul | LT 230 kV GUARAPUAVA OESTE /IRATI NORTE PR | LT 230 kV GUARAPUAVA OESTE /IRATI NORTE C-1 PR | RB | FT LT 230 kV GUARAPUAVA OESTE /IRATI NORTE C-1 PR | 057/2001 | IPCA | RBNI | DSP 571/2025 | 6/24/2022 | 6/23/2056 | R$648,225.13 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV Guarapuava Oeste - Irati Norte C1 circuito duplo, para seccionamento da Linha de Transmissão 230 kV Areia -Ponta Grossa Norte C1 (também seccionada na SE Irati Norte) na Subestação seccionadora Guarapuava Oeste, com 54,53 km de extensão. | |||
| AXIA Energia Nordeste | LT 230 kV IBIAPINA II /SOBRAL II CE | LT 230 kV IBIAPINA II /SOBRAL II C-1 CE | RB | FT LT 230 kV IBIAPINA II /SOBRAL II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,669,148.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV IBIAPINA II /SOBRAL II CE | LT 230 kV IBIAPINA II /SOBRAL II C-1 CE | RB | FT LT 230 kV IBIAPINA II /SOBRAL II C-1 CE | 061/2001 | IPCA | RBNI | REA 5987/2016 | 7/20/2023 | 7/19/2051 | R$961,964.64 | 6/1/2025 | Ativa | T2016-048 | Recapacitar a LT 230 kV PIRIPIRI - SOBRAL (seccionada na SE Ibiapina II) corrente de curta duração de 595 A para 630 A, com inserção de estruturas metálicas e substituição de trechos de cabo condutor e para-raios. Trecho LT 230 kV IBIAPINA II /SOBRAL II C-1 CE. | ||
| AXIA Energia Nordeste | LT 230 kV IBIAPINA II /SOBRAL II CE | LT 230 kV IBIAPINA II /SOBRAL II C-1 CE | RB | FT LT 230 kV IBIAPINA II /SOBRAL II C-1 CE | 061/2001 | IPCA | RBNI | REA 10142/2021 | 2/10/2021 | 12/31/2042 | R$53,287.54 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 230 kV, circuito duplo, entre o ponto de seccionamento da linha de transmissão 230 kV Sobral II - Piripiri e a subestação seccionadora Ibiapina II, com 11 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV IBIAPINA II /SOBRAL II CE | LT 230 kV IBIAPINA II /SOBRAL II C-1 CE | RB | FT LT 230 kV IBIAPINA II /SOBRAL II C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/6/2022 | 10/10/2059 | R$66,010.78 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV ICO /MILAGRES CE | LT 230 kV ICO /MILAGRES C-2 CE | RB | FT LT 230 kV ICO /MILAGRES C-2 CE | 061/2001 | IPCA | RBNIA | DSP 2563/2023 | R$217,819.85 | 6/1/2025 | Prevista | T2023-128 | Instalar o circuito LT 230 kV ICO /MILAGRES C-2 CE originado do seccionamento do circuito LT 230 kV MILAGRES /BANABUIU C-2 CE na SE ICO | ||||
| AXIA Energia Nordeste | LT 230 kV ICO /MILAGRES CE | LT 230 kV ICO /MILAGRES C-1 CE | RB | FT LT 230 kV ICO /MILAGRES C-1 CE | 061/2001 | IPCA | RBNI | REA 1312/2008 | 11/13/2012 | 7/31/2053 | R$90,217.31 | 6/1/2025 | Ativa | T2000-194 | Instalar o circuito C1 da LT 230 kV MILAGRES /ICO CE originado do seccionamento do circuito LT 230 kV MILAGRES /BANABUIU C-3 CE na SE ICO *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV ICO /MILAGRES CE | LT 230 kV ICO /MILAGRES C-1 CE | RB | FT LT 230 kV ICO /MILAGRES C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,621,516.33 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ICO /MILAGRES CE | LT 230 kV ICO /MILAGRES C-1 CE | RB | FT LT 230 kV ICO /MILAGRES C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,550,248.82 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV IGAPORA II /B.J.LAPA II BA | LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA | RB | FT LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA | 020/2010 | IPCA | RBL | CC 020/2010 | 6/2/2014 | 11/23/2040 | R$ 4,601,743.29 | 6/1/2025 | Ativa | T2010-091 | Contrato de Concessão nº 020/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | LT 230 kV IGAPORA II /B.J.LAPA II BA | LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA | RB | FT LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA | 020/2010 | IPCA | RBNI | REA 3460/2012 | 6/2/2014 | 6/2/2054 | R$140,410.81 | 6/1/2025 | Ativa | T2012-049 | Recapacitação, de 438 MVA para 645 MVA (limite de longa duração) e de 617 MVA para 753 MVA (limite de curta duração). * Receita Revisada no reajuste do ciclo 2016-2017 *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Nordeste | LT 230 kV IGAPORA II /IGAPORA III BA | LT 230 kV IGAPORA II /IGAPORA III C-2 BA | RB | FT LT 230 kV IGAPORA II /IGAPORA III C-2 BA | 019/2012 | IPCA | RBL | CC 019/2012 | 11/16/2015 | 6/1/2042 | R$163,269.07 | 6/1/2025 | Ativa | T2012-078 | T2012-078 - SE 500/230 kV Igaporã III; SE 230/69 kV Pindaí II (ICG) e LTs 230 kV - Rede Básica *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | LT 230 kV IGAPORA II /IGAPORA III BA | LT 230 kV IGAPORA II /IGAPORA III C-1 BA | RB | FT LT 230 kV IGAPORA II /IGAPORA III C-1 BA | 019/2012 | IPCA | RBL | CC 019/2012 | 11/16/2015 | 6/1/2042 | R$163,269.07 | 6/1/2025 | Ativa | T2012-078 | T2012-078 - SE 500/230 kV Igaporã III; SE 230/69 kV Pindaí II (ICG) e LTs 230 kV - Rede Básica *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | LT 230 kV IGAPORA III /PINDAI II BA | LT 230 kV IGAPORA III /PINDAI II C-1 BA | RB | FT LT 230 kV IGAPORA III /PINDAI II C-1 BA | 019/2012 | IPCA | RBL | CC 019/2012 | 11/16/2015 | 6/1/2042 | R$ 3,755,170.95 | 6/1/2025 | Ativa | T2012-078 | T2012-078 - SE 500/230 kV Igaporã III; SE 230/69 kV Pindaí II (ICG) e LTs 230 kV - Rede Básica *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | LT 230 kV IMPERATRIZ /PORTO FRANCO MA | LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA | RB | FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,395,873.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV IMPERATRIZ /PORTO FRANCO MA | LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA | RB | FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 5,201,258.04 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV IMPERATRIZ /PORTO FRANCO MA | LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA | RB | FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 4,988,511.09 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV IRATI NORTE /PONTA GROSSA PR | LT 230 kV IRATI NORTE /PONTA GROSSA C-1 PR | RB | FT LT 230 kV IRATI NORTE /PONTA GROSSA C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$595,637.56 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV IRATI NORTE /PONTA GROSSA PR | LT 230 kV IRATI NORTE /PONTA GROSSA C-1 PR | RB | FT LT 230 kV IRATI NORTE /PONTA GROSSA C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,045,392.83 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV IRATI NORTE /PONTA GROSSA PR | LT 230 kV IRATI NORTE /PONTA GROSSA C-1 PR | RB | FT LT 230 kV IRATI NORTE /PONTA GROSSA C-1 PR | 057/2001 | IPCA | RBNI | DSP 1281/2022 | 4/18/2022 | 12/31/2042 | R$4,366.16 | 6/1/2025 | Ativa | T2018-012-F | Receita resultante do seccionamento do circuito LT 230 kV GUARAPUAVA OESTE /PONTA GROSSA C-1 PR na SE IRATI NORTE. Receita resultante do seccionamento do circuito LT 230 kV AREIA /PONTA GROSSA C-1 PR na SE GUARAPUAVA OESTE . Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Areia -Ponta Grossa C1, originado do seccionamento da Linha de Transmissão 230 kV Areia - Ponta Grossa Norte C1, e a Subestação seccionadora Ponta Grossa, com 2,83 km de extensão. (Após o secc., a data desvinculou e precisou ser corrigida para 30/06/2056, data original) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | LT 230 kV IRATI NORTE /PONTA GROSSA PR | LT 230 kV IRATI NORTE /PONTA GROSSA C-1 PR | RB | FT LT 230 kV IRATI NORTE /PONTA GROSSA C-1 PR | 057/2001 | IPCA | RBNI | DSP 695/2024 | 7/3/2023 | 7/2/2057 | R$26,129.95 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Ponta Grossa-Irati Norte C1, originado do seccionamento da Linha de Transmissão 230 kV Areia - Ponta Grossa Norte C1, e a Subestação seccionadora Irati Norte, com 1,69 km de extensão. | |||
| AXIA Energia Nordeste | LT 230 kV IRECE /BROT.MACAUBAS BA | LT 230 kV IRECE /BROT.MACAUBAS C-1 BA | RB | FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,173,719.52 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV IRECE /BROT.MACAUBAS BA | LT 230 kV IRECE /BROT.MACAUBAS C-1 BA | RB | FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA | 061/2001 | IPCA | RBNI | REA 4629/2014 | 9/27/2013 | 12/31/2042 | R$341,628.44 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho do circuito 1 da LT 230 kV Irecê / Brotas de Macaúbas, de 27,138 km, em circuito duplo, cabo condutor CAA 636 MCM Grosbeak, compreendido entre o ponto de seccionamento da linha de transmissão 230 kV Irecê / Bom Jesus da Lapa e a subestação Brotas de Macaúbas. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV IRECE /BROT.MACAUBAS BA | LT 230 kV IRECE /BROT.MACAUBAS C-1 BA | RB | FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 6/3/2014 | 6/2/2039 | R$357,703.21 | 6/1/2025 | Ativa | RECONSTRUÇÃO DA ESTRADA DE ACESSO Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV IRECE /BROT.MACAUBAS BA | LT 230 kV IRECE /BROT.MACAUBAS C-1 BA | RB | FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,099,824.25 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ITABAIANA /ITABAIANINHA SE | LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE | RB | FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE | 061/2001 | IPCA | RBNI | REA 3817/2013 | 4/10/2017 | 2/14/2054 | R$586,675.79 | 6/1/2025 | Ativa | T2012-104 | Recapacitação do circuito 1 da LT 230 kV Itabaiana - Itabaianinha, circuito simples, cabo 636 MCM, com 76,8 km de extensão, contemplando instalação e/ou substituição de estruturas e de cabos condutores e para-raios *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV ITABAIANA /ITABAIANINHA SE | LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE | RB | FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,401,827.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ITABAIANA /ITABAIANINHA SE | LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE | RB | FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/30/2012 | 10/29/2045 | R$902,116.22 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV ITABAIANA /JARDIM SE | LT 230 kV ITABAIANA /JARDIM C-2 SE | RB | FT LT 230 kV ITABAIANA /JARDIM C-2 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$633,911.32 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ITABAIANA /JARDIM SE | LT 230 kV ITABAIANA /JARDIM C-2 SE | RB | FT LT 230 kV ITABAIANA /JARDIM C-2 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,778,862.26 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ITABAIANA /JARDIM SE | LT 230 kV ITABAIANA /JARDIM C-2 SE | RB | FT LT 230 kV ITABAIANA /JARDIM C-2 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/11/2021 | 10/15/2058 | R$60,949.75 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV ITABAIANA /JARDIM SE | LT 230 kV ITABAIANA /JARDIM C-1 SE | RB | FT LT 230 kV ITABAIANA /JARDIM C-1 SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$633,911.32 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ITABAIANA /JARDIM SE | LT 230 kV ITABAIANA /JARDIM C-1 SE | RB | FT LT 230 kV ITABAIANA /JARDIM C-1 SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,778,862.26 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ITABAIANA /JARDIM SE | LT 230 kV ITABAIANA /JARDIM C-1 SE | RB | FT LT 230 kV ITABAIANA /JARDIM C-1 SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/22/2022 | 12/18/2055 | R$618,192.77 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV ITABAIANINHA /CATU SE/BA | LT 230 kV ITABAIANINHA /CATU C-1 SE/BA | RB | FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,626,600.85 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ITABAIANINHA /CATU SE/BA | LT 230 kV ITABAIANINHA /CATU C-1 SE/BA | RB | FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA | 061/2001 | IPCA | RBNI | REA 4407/2013 | 12/23/2021 | 2/21/2058 | R$ 2,682,647.26 | 6/1/2025 | Ativa | T2013-070 | Recapacitação de 144 km da Linha de transmissão Itabaianinha - Catu C1 com finalidade de aumento da capacidade de curta duração de 174 MVA para 247 MVA. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV ITABAIANINHA /CATU SE/BA | LT 230 kV ITABAIANINHA /CATU C-1 SE/BA | RB | FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/28/2014 | 7/27/2047 | R$160,034.98 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE CABOS PARARRAIOS E SISTEMA DE ATERRAMENTO Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV ITABAIANINHA /CATU SE/BA | LT 230 kV ITABAIANINHA /CATU C-1 SE/BA | RB | FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/13/2021 | 4/12/2046 | R$57,578.38 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV ITABUNA III /ITAPEBI BA | LT 230 kV ITABUNA III /ITAPEBI C-1 BA | RB | FT LT 230 kV ITABUNA III /ITAPEBI C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,872,919.80 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ITABUNA III /ITAPEBI BA | LT 230 kV ITABUNA III /ITAPEBI C-1 BA | RB | FT LT 230 kV ITABUNA III /ITAPEBI C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 5,255,729.42 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ITABUNA III /ITAPEBI BA | LT 230 kV ITABUNA III /ITAPEBI C-1 BA | RB | FT LT 230 kV ITABUNA III /ITAPEBI C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 4,845,140.38 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ITABUNA III /ITAPEBI BA | LT 230 kV ITABUNA III /ITAPEBI C-1 BA | RB | FT LT 230 kV ITABUNA III /ITAPEBI C-1 BA | 061/2001 | IPCA | RBNI | DSP 1270/2022 | 4/5/2022 | 12/31/2042 | R$185,405.21 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Itabuna III-Itapebi C1, originado do seccionamento da Linha de Transmissão 230 kV Funil - Itapebi C2, e a subestação seccionadora Itabuna III, com 25 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV ITAPEBI /EUNAPOLIS BA | LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$677,132.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ITAPEBI /EUNAPOLIS BA | LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,900,148.33 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ITAPEBI /EUNAPOLIS BA | LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,751,704.60 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ITAPEBI /EUNAPOLIS BA | LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA | 061/2001 | IPCA | RBNIA | REA 15815/2025 | R$ 7,938,667.19 | 6/1/2025 | Prevista | T2024-243 | Recondutoramento da LT 230 kV Itapebi - Eunápolis C2, Circuito Duplo 230 kV, originalmente 1 x 636 MCM (GROSBEAK)para 1 x 788 MCM (CORDOBA) termorresistente. | ||||
| AXIA Energia Nordeste | LT 230 kV ITAPEBI /EUNAPOLIS BA | LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$677,132.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ITAPEBI /EUNAPOLIS BA | LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,900,148.33 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ITAPEBI /EUNAPOLIS BA | LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,751,704.60 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV ITAPEBI /EUNAPOLIS BA | LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA | RB | FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA | 061/2001 | IPCA | RBNIA | REA 15815/2025 | R$ 7,938,667.19 | 6/1/2025 | Prevista | T2024-242 | Recondutoramento da LT 230 kV Itapebi - Eunápolis C1, Circuito Duplo 230 kV, originalmente 1 x 636 MCM (GROSBEAK)para 1 x 788 MCM (CORDOBA) termorresistente. | ||||
| AXIA Energia | LT 230 kV ITUMBIARA /C. DOURADA MG/GO | LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO | RB | FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$766,510.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV ITUMBIARA /RIO VERDE FUR MG/GO | LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO | RB | FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,518,978.80 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV ITUMBIARA /RIO VERDE FUR MG/GO | LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO | RB | FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 13,503,649.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV ITUMBIARA /RIO VERDE FUR MG/GO | LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO | RB | FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 14,476,634.67 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV ITUMBIARA /RIO VERDE FUR MG/GO | LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO | RB | FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,623,502.92 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV ITUMBIARA /RIO VERDE FUR MG/GO | LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO | RB | FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 13,904,747.55 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV J.LACERDA-A /J.LACERDA-B SC | LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC | RB | FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$12,963.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV J.LACERDA-A /J.LACERDA-B SC | LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC | RB | FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$12,963.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV J.LACERDA-A /J.LACERDA-B SC | LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC | RB | FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$22,752.35 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV J.LACERDA-B /PALHOCA ESU SC | LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC | RB | FT LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,904,584.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV J.LACERDA-B /PALHOCA ESU SC | LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC | RB | FT LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,342,702.45 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV J.LACERDA-B /PALHOCA ESU SC | LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC | RB | FT LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC | 057/2001 | IPCA | RMEL | REA 7759/2019 | 12/4/2019 | 11/13/2055 | R$43,913.86 | 6/1/2025 | Ativa | T2019-012 | Adequação na LT 230 kV J Lacerda B / Palhoça C-1, com a substituição na fundação de 4 torres e do sistema de aterramento com instalação de cabos contrapeso na LT *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | LT 230 kV J.LACERDA-B /SIDEROPOL.ESU SC | LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC | RB | FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$746,988.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV J.LACERDA-B /SIDEROPOL.ESU SC | LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC | RB | FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,311,026.75 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV J.LACERDA-B /SIDEROPOL.ESU SC | LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC | RB | FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$780,153.25 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV J.LACERDA-B /SIDEROPOL.ESU SC | LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC | RB | FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,369,233.01 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV J.LACERDA-B /U.JLACERDA-C SC | LT 230 kV J.LACERDA-B /U.JLACERDA-C C-2 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$8,102.31 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 230 kV J.LACERDA-B /U.JLACERDA-C SC | LT 230 kV J.LACERDA-B /U.JLACERDA-C C-2 SC | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$14,220.22 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 230 kV J.LACERDA-B /U.JLACERDA-C SC | LT 230 kV J.LACERDA-B /U.JLACERDA-C C-2 SC | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$12,044.77 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 230 kV J.LACERDA-B /U.JLACERDA-C SC | LT 230 kV J.LACERDA-B /U.JLACERDA-C C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$8,102.31 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 230 kV J.LACERDA-B /U.JLACERDA-C SC | LT 230 kV J.LACERDA-B /U.JLACERDA-C C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$14,220.22 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 230 kV J.LACERDA-B /U.JLACERDA-C SC | LT 230 kV J.LACERDA-B /U.JLACERDA-C C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$12,044.77 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV JABOATAO II /PIRAPAMA II PE | LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE | RB | FT LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$302,692.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV JABOATAO II /PIRAPAMA II PE | LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE | RB | FT LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$849,406.73 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV JABOATAO II /PIRAPAMA II PE | LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE | RB | FT LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE | 061/2001 | IPCA | RBNI | REA 10092/2021 | 2/23/2021 | 12/31/2042 | R$152,889.62 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 230 kV, circuito duplo, entre o ponto de seccionamento da linha de transmissão 230 kV Recife II - Pirapama II e a subestação seccionadora Jaboatão II, com 14 Km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV JACARACANGA /ALCAN BA | LT 230 kV JACARACANGA /ALCAN C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$40,937.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV JACARACANGA /ALCAN BA | LT 230 kV JACARACANGA /ALCAN C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$114,878.10 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV JACARACANGA /DOW QUIMICA BA | LT 230 kV JACARACANGA /DOW QUIMICA C-2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$170,847.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV JACARACANGA /DOW QUIMICA BA | LT 230 kV JACARACANGA /DOW QUIMICA C-2 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$479,427.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV JACARACANGA /DOW QUIMICA BA | LT 230 kV JACARACANGA /DOW QUIMICA C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$173,038.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV JACARACANGA /DOW QUIMICA BA | LT 230 kV JACARACANGA /DOW QUIMICA C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$485,574.02 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV JACARACANGA /DOW QUIMICA BA | LT 230 kV JACARACANGA /DOW QUIMICA C-1 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/1/2022 | 5/4/2055 | R$103,300.22 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | LT 230 kV JAGUARARI-SE /SR.BONFIM II BA | LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA | RB | FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA | 061/2001 | IPCA | RBNI | REA 2173/2009 | 9/27/2012 | 5/19/2052 | R$113,268.07 | 6/1/2025 | Ativa | T2009-152 | Instalar o circuito LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA originado do seccionamento do circuito LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA na SE JAGUARARI-SE (Complementação da LT 230 kV Jaguarari - Ramal Juazeiro II - Sr. Bonfim II) *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV JAGUARARI-SE /SR.BONFIM II BA | LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA | RB | FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,326,218.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV JAGUARARI-SE /SR.BONFIM II BA | LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA | RB | FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,721,593.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV JAGUARARI-SE /SR.BONFIM II BA | LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA | RB | FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/17/2021 | 12/16/2054 | R$961,595.72 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | LT 230 kV JARU /JI-PARANA RO | LT 230 kV JARU /JI-PARANA C-1 RO | RB | FT LT 230 kV JARU /JI-PARANA C-1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,819,011.27 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV JAURU /VARZEA GRANDE 2 MT | LT 230 kV JAURU /VARZEA GRANDE 2 C-2 MT | RB | FT LT 230 kV JAURU /VARZEA GRANDE 2 C-2 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 5,747,201.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV JAURU /VARZEA GRANDE 2 MT | LT 230 kV JAURU /VARZEA GRANDE 2 C-2 MT | RB | FT LT 230 kV JAURU /VARZEA GRANDE 2 C-2 MT | 058/2001 | IPCA | RBNI | REA 4967/2014 | 7/8/2016 | 3/15/2053 | R$313,586.01 | 6/1/2025 | Ativa | T2014-091 | Instalar o circuito LT 230 kV JAURU /VARZEA GRANDE C-1 MT originado do seccionamento do circuito LT 230 kV JAURU /COXIPO C-1 MT na SE VARZEA GRANDE *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | LT 230 kV JAURU /VARZEA GRANDE 2 MT | LT 230 kV JAURU /VARZEA GRANDE 2 C-2 MT | RB | FT LT 230 kV JAURU /VARZEA GRANDE 2 C-2 MT | 058/2001 | IPCA | RBNI | REA 4530/2014 | 10/3/2014 | 3/3/2043 | R$444,978.40 | 6/1/2025 | Ativa | Construção de aproximadamente 590m, dentro dos limites da SE Jauru, para conexão do circuito 1 da LT 230 kV Jauru - Coxipó à LT 138 kV Jauru - Araputanga; e Construção de aproximadamente 120 m, dentro dos limites da SE Coxipó, para conexão do circuito 1 da LT 230 kV Jauru – Coxipó à LT 138 kV Coxipó – Jaciara; Obra inserida no ciclo de reajuste 2015/2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | LT 230 kV JAURU /VARZEA GRANDE 2 MT | LT 230 kV JAURU /VARZEA GRANDE 2 C-1 MT | RB | FT LT 230 kV JAURU /VARZEA GRANDE 2 C-1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 5,867,724.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV JAURU /VARZEA GRANDE 2 MT | LT 230 kV JAURU /VARZEA GRANDE 2 C-1 MT | RB | FT LT 230 kV JAURU /VARZEA GRANDE 2 C-1 MT | 058/2001 | IPCA | RMEL | REN 905/2020 | 12/17/2020 | 12/20/2050 | R$15,149.17 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | LT 230 kV JI-PARANA /PIMENTA BUENO RO | LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO | RB | FT LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO | 021/2009 | IPCA | RBL | CC 021/2009 | 10/28/2015 | 11/19/2039 | R$ 10,197,677.97 | 6/1/2025 | Ativa | T2009-245 | *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Norte | LT 230 kV JI-PARANA /PIMENTA BUENO RO | LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO | RB | FT LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,562,733.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV JOAO PESSOA II /MUSSURE II PB | LT 230 kV JOAO PESSOA II /MUSSURE II C-2 PB | RB | FT LT 230 kV JOAO PESSOA II /MUSSURE II C-2 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$6,597.27 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV JOAO PESSOA II /MUSSURE II PB | LT 230 kV JOAO PESSOA II /MUSSURE II C-2 PB | RB | FT LT 230 kV JOAO PESSOA II /MUSSURE II C-2 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$18,513.05 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV JOAO PESSOA II /MUSSURE II PB | LT 230 kV JOAO PESSOA II /MUSSURE II C-2 PB | RB | FT LT 230 kV JOAO PESSOA II /MUSSURE II C-2 PB | 061/2001 | IPCA | RBNI | DSP 420/2023 | 9/26/2022 | 12/31/2042 | R$3,452.70 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, João Pessoa II-Mussuré II CF2, originado do seccionamento da Linha de Transmissão 230 kV Goianinha - Mussuré II C1 na Subestação seccionadora João Pessoa II, com 483 m de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV JOAO PESSOA II /MUSSURE II PB | LT 230 kV JOAO PESSOA II /MUSSURE II C-1 PB | RB | FT LT 230 kV JOAO PESSOA II /MUSSURE II C-1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,510.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV JOAO PESSOA II /MUSSURE II PB | LT 230 kV JOAO PESSOA II /MUSSURE II C-1 PB | RB | FT LT 230 kV JOAO PESSOA II /MUSSURE II C-1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$166,995.23 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV JOAO PESSOA II /MUSSURE II PB | LT 230 kV JOAO PESSOA II /MUSSURE II C-1 PB | RB | FT LT 230 kV JOAO PESSOA II /MUSSURE II C-1 PB | 061/2001 | IPCA | RBNI | DSP 420/2023 | 9/26/2022 | 12/31/2042 | R$5,113.52 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Mussuré II -João Pessoa II CF1, originado do seccionamento da Linha de Transmissão 230 kV Mussuré II - Santa Rita II C1 na Subestação seccionadora João Pessoa II, com 796 m de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV JOAO PESSOA II /MUSSURE II PB | LT 230 kV JOAO PESSOA II /MUSSURE II C-1 PB | RB | FT LT 230 kV JOAO PESSOA II /MUSSURE II C-1 PB | 061/2001 | IPCA | RBNI | REA 10199/2021 | 5/17/2021 | 12/31/2042 | R$18,380.89 | 6/1/2025 | Ativa | Receita resultante do seccionamento do circuito LT 230 kV SANTA RITA II /MUSSURE II C-1 PB na SE JOAO PESSOA II. Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 230 kV, circuito duplo, Santa Rita II - Mussuré II, originado do seccionamento da linha de transmissão 230 kV Goianinha - Mussuré II C1 na subestação seccionadora Santa Rita II, com 12,49 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV JOAO PESSOA II /SANTA RITA II PB | LT 230 kV JOAO PESSOA II /SANTA RITA II C-2 PB | RB | FT LT 230 kV JOAO PESSOA II /SANTA RITA II C-2 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$79,167.21 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV JOAO PESSOA II /SANTA RITA II PB | LT 230 kV JOAO PESSOA II /SANTA RITA II C-2 PB | RB | FT LT 230 kV JOAO PESSOA II /SANTA RITA II C-2 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$222,156.55 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV JOAO PESSOA II /SANTA RITA II PB | LT 230 kV JOAO PESSOA II /SANTA RITA II C-2 PB | RB | FT LT 230 kV JOAO PESSOA II /SANTA RITA II C-2 PB | 061/2001 | IPCA | RBNI | DSP 420/2023 | 9/26/2022 | 12/31/2042 | R$2,816.48 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, João Pessoa II-Santa Rita II CF4, originado do seccionamento da Linha de Transmissão 230 kV Goianinha - Santa Rita II C1 na Subestação seccionadora João Pessoa II, com 394 m de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV JOAO PESSOA II /SANTA RITA II PB | LT 230 kV JOAO PESSOA II /SANTA RITA II C-2 PB | RB | FT LT 230 kV JOAO PESSOA II /SANTA RITA II C-2 PB | 061/2001 | IPCA | RBNI | REA 10199/2021 | 5/17/2021 | 12/31/2042 | R$47,790.33 | 6/1/2025 | Ativa | Receita resultante do seccionamento do circuito LT 230 kV SANTA RITA II /MUSSURE II C-1 PB na SE JOAO PESSOA II. Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 230 kV, circuito duplo, Santa Rita II - Mussuré II, originado do seccionamento da linha de transmissão 230 kV Goianinha - Mussuré II C1 na subestação seccionadora Santa Rita II, com 12,49 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV JOAO PESSOA II /SANTA RITA II PB | LT 230 kV JOAO PESSOA II /SANTA RITA II C-1 PB | RB | FT LT 230 kV JOAO PESSOA II /SANTA RITA II C-1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$135,417.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV JOAO PESSOA II /SANTA RITA II PB | LT 230 kV JOAO PESSOA II /SANTA RITA II C-1 PB | RB | FT LT 230 kV JOAO PESSOA II /SANTA RITA II C-1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$380,004.63 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV JOAO PESSOA II /SANTA RITA II PB | LT 230 kV JOAO PESSOA II /SANTA RITA II C-1 PB | RB | FT LT 230 kV JOAO PESSOA II /SANTA RITA II C-1 PB | 061/2001 | IPCA | RBNI | DSP 420/2023 | 9/26/2022 | 12/31/2042 | R$5,113.52 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, João Pessoa II-Santa Rita II CJ1, originado do seccionamento da Linha de Transmissão 230 kV Mussuré II - Santa Rita II C1 na Subestação seccionadora João Pessoa II, com 796 m de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV JOAO PESSOA II /SANTA RITA II PB | LT 230 kV JOAO PESSOA II /SANTA RITA II C-1 PB | RB | FT LT 230 kV JOAO PESSOA II /SANTA RITA II C-1 PB | 061/2001 | IPCA | RBNI | REA 10199/2021 | 5/17/2021 | 12/31/2042 | R$14,580.10 | 6/1/2025 | Ativa | Receita resultante do seccionamento do circuito LT 230 kV GOIANINHA /SANTA RITA II C-1 PE/PB na SE JOAO PESSOA II. Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 230 kV, circuito duplo, Goianinha-Santa Rita II, originado do seccionamento da linha de transmissão 230 kV Goianinha - Mussuré II C1 na subestação seccionadora Santa Rita II, com 12,49 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | LT 230 kV JOINVILLE /JOINV.NORTE SC | LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC | RB | FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$99,872.25 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV JOINVILLE /JOINV.NORTE SC | LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC | RB | FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,284.00 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV JOINVILLE /VEGA DO SUL SC | LT 230 kV JOINVILLE /VEGA DO SUL C-2 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$549,710.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 230 kV JOINVILLE /VEGA DO SUL SC | LT 230 kV JOINVILLE /VEGA DO SUL C-1 SC | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$549,710.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 230 kV JOINVILLE /VEGA DO SUL SC | LT 230 kV JOINVILLE /VEGA DO SUL C-1 SC | DIT | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/31/2023 | 2/4/2060 | R$108,234.11 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | LT 230 kV JORGE TEIXEIRA /LECHUGA AM | LT 230 kV JORGE TEIXEIRA /LECHUGA C-3 AM | RB | FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-3 AM | 014/2012 | IPCA | RBL | CC 014/2012 | 7/1/2016 | 5/7/2042 | R$ 3,345,513.47 | 6/1/2025 | Ativa | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Norte | LT 230 kV JORGE TEIXEIRA /LECHUGA AM | LT 230 kV JORGE TEIXEIRA /LECHUGA C-2 AM | RB | FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-2 AM | 009/2010 | IPCA | RBL | CC 009/2010 | 3/17/2014 | 7/12/2040 | R$ 2,435,421.51 | 6/1/2025 | Ativa | T2010-063 | *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Norte | LT 230 kV JORGE TEIXEIRA /LECHUGA AM | LT 230 kV JORGE TEIXEIRA /LECHUGA C-1 AM | RB | FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-1 AM | 009/2010 | IPCA | RBL | CC 009/2010 | 3/17/2014 | 7/12/2040 | R$ 2,435,421.51 | 6/1/2025 | Ativa | T2010-063 | *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Nordeste | LT 230 kV JUAZEIRO II /JAGUARARI-SE BA | LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA | RB | FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,150,069.41 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV JUAZEIRO II /JAGUARARI-SE BA | LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA | RB | FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,227,289.09 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV JUAZEIRO II /JAGUARARI-SE BA | LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA | RB | FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/17/2021 | 12/16/2054 | R$755,880.51 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV JUAZEIRO II /SR.BONFIM II BA | LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA | RB | FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,140,891.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV JUAZEIRO II /SR.BONFIM II BA | LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA | RB | FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,007,703.01 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV L.GRANDE /CAXIAS SUL 5 RS | LT 230 kV L.GRANDE /CAXIAS SUL 5 C-1 RS | RB | FT LT 230 kV L.GRANDE /CAXIAS SUL 5 C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,035,992.98 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV LAGOA DO CARRO /PAU FERRO PE | LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE | RB | FT LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$492,848.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV LAGOA DO CARRO /PAU FERRO PE | LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE | RB | FT LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,383,017.45 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV LAGOA DO CARRO /PAU FERRO PE | LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE | RB | FT LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,274,973.12 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV LAGOA DO CARRO /PAU FERRO PE | LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE | RB | FT LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE | 061/2001 | IPCA | RBNI | REA 9687/2021 | 10/22/2020 | 12/31/2042 | R$85,625.95 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trechos de linha de transmissão em 230 kV, circuito duplo, entre o ponto de seccionamento da Linha de Transmissão 230 kV Pau Ferro – Coteminas na Subestação Lagoa do Carro, com 11 Km de extensão cada. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | LT 230 kV LIVRAMENTO 2 /RIVERA URU RS | LT 230 kV LIVRAMENTO 2 /RIVERA URU C-1 RS | RB | FT LT 230 kV LIVRAMENTO 2 /RIVERA URU C-1 RS | 057/2001 | IPCA | RBNI | PRT 657/2022 | 3/24/2023 | 12/31/2042 | R$43,284.92 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção da LT 230 kV Rivera - Livramento 2 com 2 km de extensão. | |||
| AXIA Energia Sul | LT 230 kV LONDRINA ESU /LONDRINA COT PR | LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR | RB | FT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$386,849.44 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV LONDRINA ESU /LONDRINA COT PR | LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR | RB | FT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$678,952.54 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV LONDRINA ESU /LONDRINA COT PR | LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR | RB | FT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR | 057/2001 | IPCA | RMEL | REA 7759/2019 | 5/27/2019 | 5/27/2050 | R$124,156.57 | 6/1/2025 | Ativa | T2019-011 | Adequação na LT 230 kV Assis / Londrina C-1, com a substituição das fundações em grelha por sapatas em concreto e troca dos cabos contrapeso de 16 torres da LT | ||
| AXIA Energia Sul | LT 230 kV LONDRINA ESU /LONDRINA COT PR | LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR | RB | FT LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$499,045.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV LONDRINA ESU /LONDRINA COT PR | LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR | RB | FT LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$875,865.65 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV LONDRINA ESU /LONDRINA COT PR | LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR | RB | FT LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$741,873.48 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV LONDRINA ESU /LONDRINA SUL PR | LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR | RB | FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$480,094.31 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV LONDRINA ESU /LONDRINA SUL PR | LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR | RB | FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$842,604.93 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV LONDRINA ESU /LONDRINA SUL PR | LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR | RB | FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$713,701.07 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV LONDRINA ESU /LONDRINA SUL PR | LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR | RB | FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR | 057/2001 | IPCA | RBNI | DSP 1302/2022 | 3/30/2022 | 12/31/2042 | R$9,322.13 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Londrina (ESUL) -Londrina Sul C1, originado do seccionamento da Linha de Transmissão 230 kV Londrina (ESUL) - Apucarana C1, e a subestação seccionadora Londrina Sul, com 1,1 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | LT 230 kV LONDRINA ESU /SARANDI PR | LT 230 kV LONDRINA ESU /SARANDI C-1 PR | RB | FT LT 230 kV LONDRINA ESU /SARANDI C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,233,201.93 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV LONDRINA ESU /SARANDI PR | LT 230 kV LONDRINA ESU /SARANDI C-1 PR | RB | FT LT 230 kV LONDRINA ESU /SARANDI C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,164,370.65 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV LONDRINA ESU /SARANDI PR | LT 230 kV LONDRINA ESU /SARANDI C-1 PR | RB | FT LT 230 kV LONDRINA ESU /SARANDI C-1 PR | 057/2001 | IPCA | RBNI | REA 8795/2020 | 3/31/2023 | 3/31/2051 | R$81,466.11 | 6/1/2025 | Ativa | T2020-024 | Instalar o circuito LT 230 kV LONDRINA ESU /SARANDI C-1 PR originado do seccionamento do circuito LT 230 kV LONDRINA ESU /MARINGA C-1 PR na SE SARANDI | ||
| AXIA Energia Sul | LT 230 kV LONDRINA ESU /SARANDI PR | LT 230 kV LONDRINA ESU /SARANDI C-1 PR | RB | FT LT 230 kV LONDRINA ESU /SARANDI C-1 PR | 057/2001 | IPCA | RBNI | REA 8795/2020 | 3/31/2023 | 3/31/2056 | R$10,528.12 | 6/1/2025 | Ativa | T2020-024 | Substituição de 1,36 km de cabo para-raios convencional 3/8" EAR por cabo CAA Dotterel entre o ponto de seccionamento da LT 230 kV Londrina ESUL - Maringá C1 e a SE Londrina ESUL , em funçãode superação por nível de curto-circuito causado pelo seccionamento da referida LT na SE Sarandi. | ||
| AXIA Energia Sul | LT 230 kV LONDRINA ESU /SARANDI PR | LT 230 kV LONDRINA ESU /SARANDI C-1 PR | RB | FT LT 230 kV LONDRINA ESU /SARANDI C-1 PR | 057/2001 | IPCA | RBNI | REA 8795/2020 | 3/31/2023 | 3/30/2056 | R$97,096.39 | 6/1/2025 | Ativa | T2020-024 | Substituição de 10,33 km de cabo para-raios OPGW entre o ponto de seccionamento da LT 230 kV Londrina ESUL - Maringá C1 e a SE Londrina ESUL , em funçãode superação por nivel de curto-circuito causado pelo seccionamento da referida LT na SE Sarandi. | ||
| AXIA Energia Sul | LT 230 kV LONDRINA SUL /APUCARANA PR | LT 230 kV LONDRINA SUL /APUCARANA C-1 PR | RB | FT LT 230 kV LONDRINA SUL /APUCARANA C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$157,925.76 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV LONDRINA SUL /APUCARANA PR | LT 230 kV LONDRINA SUL /APUCARANA C-1 PR | RB | FT LT 230 kV LONDRINA SUL /APUCARANA C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$277,172.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV LONDRINA SUL /APUCARANA PR | LT 230 kV LONDRINA SUL /APUCARANA C-1 PR | RB | FT LT 230 kV LONDRINA SUL /APUCARANA C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$234,770.09 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV LONDRINA SUL /APUCARANA PR | LT 230 kV LONDRINA SUL /APUCARANA C-1 PR | RB | FT LT 230 kV LONDRINA SUL /APUCARANA C-1 PR | 057/2001 | IPCA | RBNI | DSP 1302/2022 | 3/30/2022 | 12/31/2042 | R$9,322.13 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Londrina Sul-Apucarana C1, originado do seccionamento da Linha de Transmissão 230 kV Londrina (ESUL) - Apucarana C1, e a subestação seccionadora Londrina Sul, com 1,1 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | LT 230 kV MACAMBARA /MACAMBARA 3 RS | LT 230 kV MACAMBARA /MACAMBARA 3 C-2 RS | RB | FT LT 230 kV MACAMBARA /MACAMBARA 3 C-2 RS | 007/2014 | IPCA | RBL | CC 007/2014 | 12/6/2019 | 1/29/2044 | R$46,560.61 | 6/1/2025 | Ativa | T2014-021-A | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | LT 230 kV MACAMBARA /MACAMBARA 3 RS | LT 230 kV MACAMBARA /MACAMBARA 3 C-2 RS | RB | FT LT 230 kV MACAMBARA /MACAMBARA 3 C-2 RS | 007/2014 | IPCA | RBNI | DSP 1135/2024 | 12/29/2023 | 12/28/2057 | R$8,092.10 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Maçambará 3-Maçambará C2, originado do seccionamento da Linha de Transmissão 230 kV Santo Ângelo - Maçambará C2, e a Subestação seccionadora Maçambará 3, com 0,5 km de extensão. | |||
| AXIA Energia Sul | LT 230 kV MACAMBARA 3 /SANTO ANGELO RS | LT 230 kV MACAMBARA 3 /SANTO ANGELO C-2 RS | RB | FT LT 230 kV MACAMBARA 3 /SANTO ANGELO C-2 RS | 007/2014 | IPCA | RBL | CC 007/2014 | 12/6/2019 | 1/29/2044 | R$ 9,271,149.42 | 6/1/2025 | Ativa | T2014-021-A | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | LT 230 kV MACAMBARA 3 /SANTO ANGELO RS | LT 230 kV MACAMBARA 3 /SANTO ANGELO C-2 RS | RB | FT LT 230 kV MACAMBARA 3 /SANTO ANGELO C-2 RS | 007/2014 | IPCA | RBNI | DSP 1135/2024 | 12/29/2023 | 12/28/2057 | R$8,092.10 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Santo Ângelo -Maçambará 3 C2, originado do seccionamento da Linha de Transmissão 230 kV Santo Ângelo - Maçambará C2, e a Subestação seccionadora Maçambará 3, com 0,5 km de extensão. | |||
| AXIA Energia Nordeste | LT 230 kV MARACANAU /FORTALEZA II CE | LT 230 kV MARACANAU /FORTALEZA II C-1 CE | RB | FT LT 230 kV MARACANAU /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$365,059.19 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MARACANAU /FORTALEZA II CE | LT 230 kV MARACANAU /FORTALEZA II C-1 CE | RB | FT LT 230 kV MARACANAU /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,024,417.76 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MARACANAU /FORTALEZA II CE | LT 230 kV MARACANAU /FORTALEZA II C-1 CE | RB | FT LT 230 kV MARACANAU /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$944,388.01 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MARACANAU /FORTALEZA II CE | LT 230 kV MARACANAU /FORTALEZA II C-1 CE | RB | FT LT 230 kV MARACANAU /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBNI | DSP 267/2023 | 5/20/2022 | 12/31/2042 | R$20,471.19 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Maracanaú II-Fortaleza II C1, originado do seccionamento da Linha de Transmissão 230 kV Cauípe - Fortaleza II C3 na Subestação seccionadora Maracanaú II, com 2 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | LT 230 kV MARINGA /SARANDI PR | LT 230 kV MARINGA /SARANDI C-2 PR | RB | FT LT 230 kV MARINGA /SARANDI C-2 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$271,830.55 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV MARINGA /SARANDI PR | LT 230 kV MARINGA /SARANDI C-2 PR | RB | FT LT 230 kV MARINGA /SARANDI C-2 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$477,084.93 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV MARINGA /SARANDI PR | LT 230 kV MARINGA /SARANDI C-2 PR | RB | FT LT 230 kV MARINGA /SARANDI C-2 PR | 057/2001 | IPCA | RBNI | REA 8795/2020 | 3/31/2023 | 3/30/2051 | R$81,466.11 | 6/1/2025 | Ativa | T2020-024 | Instalação do 2° circuito da LT230 kV MARINGA/SARANDI PR, com extensão de 17,7 km, em circuito simples, originado do seccionamento da LT 230kV Londrina ESUL-Maringá C1. | ||
| AXIA Energia Sul | LT 230 kV MARINGA /SARANDI PR | LT 230 kV MARINGA /SARANDI C-2 PR | RB | FT LT 230 kV MARINGA /SARANDI C-2 PR | 057/2001 | IPCA | RBNI | REA 8795/2020 | 3/31/2023 | 3/30/2056 | R$13,547.23 | 6/1/2025 | Ativa | T2020-024 | Substituição de 1,75 km de cabo para-raios convencional 3/8" EAR por cabo CAA Dotterel entre o ponto de seccionamento da LT 230 kV Londrina ESUL - Maringá C1 e a SE Maringá , em funçãode superação por nivel de curto-circuitocausado pelo seccionamento da referida LT na SE Sarandi. | ||
| AXIA Energia Sul | LT 230 kV MARINGA /SARANDI PR | LT 230 kV MARINGA /SARANDI C-2 PR | RB | FT LT 230 kV MARINGA /SARANDI C-2 PR | 057/2001 | IPCA | RBNI | REA 8795/2020 | 3/31/2023 | 3/30/2056 | R$133,190.30 | 6/1/2025 | Ativa | T2020-024 | Substituição de 14,17 km de cabo para-raios OPGW entre o ponto de seccionamento da LT 230 kV Londrina ESUL - Maringá C1 e a SE Maringá, em funçãode superação por nivel de curto-circuito causado pelo seccionamento da referida LT na SE Sarandi. | ||
| AXIA Energia Norte | LT 230 kV MARITUBA /UTINGA PA | LT 230 kV MARITUBA /UTINGA C-2 PA | RB | FT LT 230 kV MARITUBA /UTINGA C-2 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$113,329.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV MARITUBA /UTINGA PA | LT 230 kV MARITUBA /UTINGA C-2 PA | RB | FT LT 230 kV MARITUBA /UTINGA C-2 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$246,030.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV MARITUBA /UTINGA PA | LT 230 kV MARITUBA /UTINGA C-1 PA | RB | FT LT 230 kV MARITUBA /UTINGA C-1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$113,329.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV MARITUBA /UTINGA PA | LT 230 kV MARITUBA /UTINGA C-1 PA | RB | FT LT 230 kV MARITUBA /UTINGA C-1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$246,030.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| Nova Era Integração | LT 230 kV MAURITI II /MILAGRES CE | LT 230 kV MAURITI II /MILAGRES C-2 CE | RB | FT LT 230 kV MAURITI II /MILAGRES C-2 CE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 2,281,953.88 | 6/1/2025 | Prevista | T2024-197-B | LT 230 kV Araticum (Mauriti) - Milagres - C2 | ||||
| AXIA Energia Nordeste | LT 230 kV MAURITI II /MILAGRES CE | LT 230 kV MAURITI II /MILAGRES C-1 CE | RB | FT LT 230 kV MAURITI II /MILAGRES C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,764.36 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MAURITI II /MILAGRES CE | LT 230 kV MAURITI II /MILAGRES C-1 CE | RB | FT LT 230 kV MAURITI II /MILAGRES C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$681,237.81 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MESSIAS /MACEIO AL | LT 230 kV MESSIAS /MACEIO C-2 AL | RB | FT LT 230 kV MESSIAS /MACEIO C-2 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$410,457.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MESSIAS /MACEIO AL | LT 230 kV MESSIAS /MACEIO C-2 AL | RB | FT LT 230 kV MESSIAS /MACEIO C-2 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,151,813.32 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MESSIAS /MACEIO AL | LT 230 kV MESSIAS /MACEIO C-2 AL | RB | FT LT 230 kV MESSIAS /MACEIO C-2 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,061,831.15 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MESSIAS /MACEIO AL | LT 230 kV MESSIAS /MACEIO C-1 AL | RB | FT LT 230 kV MESSIAS /MACEIO C-1 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$410,457.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MESSIAS /MACEIO AL | LT 230 kV MESSIAS /MACEIO C-1 AL | RB | FT LT 230 kV MESSIAS /MACEIO C-1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,151,813.32 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MESSIAS /MACEIO AL | LT 230 kV MESSIAS /MACEIO C-1 AL | RB | FT LT 230 kV MESSIAS /MACEIO C-1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,061,831.15 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MESSIAS /MACEIO II AL | LT 230 kV MESSIAS /MACEIO II C-2 AL | RB | FT LT 230 kV MESSIAS /MACEIO II C-2 AL | 005/2012 | IPCA | RBL | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$ 1,001,345.25 | 6/1/2025 | Ativa | T2012-057-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | LT 230 kV MESSIAS /MACEIO II AL | LT 230 kV MESSIAS /MACEIO II C-1 AL | RB | FT LT 230 kV MESSIAS /MACEIO II C-1 AL | 005/2012 | IPCA | RBL | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$ 1,001,345.25 | 6/1/2025 | Ativa | T2012-057-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | LT 230 kV MESSIAS /RIO LARGO II AL | LT 230 kV MESSIAS /RIO LARGO II C-3 AL | RB | FT LT 230 kV MESSIAS /RIO LARGO II C-3 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$200,546.49 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MESSIAS /RIO LARGO II AL | LT 230 kV MESSIAS /RIO LARGO II C-3 AL | RB | FT LT 230 kV MESSIAS /RIO LARGO II C-3 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$562,767.33 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MESSIAS /RIO LARGO II AL | LT 230 kV MESSIAS /RIO LARGO II C-2 AL | RB | FT LT 230 kV MESSIAS /RIO LARGO II C-2 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$200,546.49 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MESSIAS /RIO LARGO II AL | LT 230 kV MESSIAS /RIO LARGO II C-2 AL | RB | FT LT 230 kV MESSIAS /RIO LARGO II C-2 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$562,767.33 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MESSIAS /RIO LARGO II AL | LT 230 kV MESSIAS /RIO LARGO II C-1 AL | RB | FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$260,652.26 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MESSIAS /RIO LARGO II AL | LT 230 kV MESSIAS /RIO LARGO II C-1 AL | RB | FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$731,434.28 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MESSIAS /RIO LARGO II AL | LT 230 kV MESSIAS /RIO LARGO II C-1 AL | RB | FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$674,293.04 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MILAGRES /BANABUIU CE | LT 230 kV MILAGRES /BANABUIU C-2 CE | RB | FT LT 230 kV MILAGRES /BANABUIU C-2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,243,032.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MILAGRES /BANABUIU CE | LT 230 kV MILAGRES /BANABUIU C-2 CE | RB | FT LT 230 kV MILAGRES /BANABUIU C-2 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 4/19/2014 | 4/23/2051 | R$3,250.02 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE CADEIAS DE ISOLADORES DE MESMO TIPO Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV MILAGRES /BANABUIU CE | LT 230 kV MILAGRES /BANABUIU C-2 CE | RB | FT LT 230 kV MILAGRES /BANABUIU C-2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 9,100,497.63 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MILAGRES /BANABUIU CE | LT 230 kV MILAGRES /BANABUIU C-1 CE | RB | FT LT 230 kV MILAGRES /BANABUIU C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 4,123,343.52 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MILAGRES /BANABUIU CE | LT 230 kV MILAGRES /BANABUIU C-1 CE | RB | FT LT 230 kV MILAGRES /BANABUIU C-1 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 4/19/2014 | 4/23/2051 | R$3,250.02 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE CADEIAS DE ISOLADORES DE MESMO TIPO Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV MILAGRES /COREMAS CE/PB | LT 230 kV MILAGRES /COREMAS C-2 CE/PB | RB | FT LT 230 kV MILAGRES /COREMAS C-2 CE/PB | 008/2005 | IGPM | RBL | CC 008/2005 | 9/25/2009 | 3/4/2035 | R$ 6,330,334.57 | 6/1/2025 | Ativa | T2000-016 | Contrato de Concessão nº 008/2005 *(Considera adicional de RGR relativo à prorrogação do encargo) | ||
| AXIA Energia Nordeste | LT 230 kV MILAGRES /COREMAS CE/PB | LT 230 kV MILAGRES /COREMAS C-1 CE/PB | RB | FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,179,403.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MILAGRES /COREMAS CE/PB | LT 230 kV MILAGRES /COREMAS C-1 CE/PB | RB | FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,115,774.05 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MILAGRES /COREMAS CE/PB | LT 230 kV MILAGRES /COREMAS C-1 CE/PB | RB | FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 5,637,996.45 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MILAGRES /COREMAS CE/PB | LT 230 kV MILAGRES /COREMAS C-1 CE/PB | RB | FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/8/2017 | 8/7/2042 | R$248,093.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV MILAGRES /CRATO II CE | LT 230 kV MILAGRES /CRATO II C-1 CE | RB | FT LT 230 kV MILAGRES /CRATO II C-1 CE | 007/2005 | IGPM | RBL | CC 007/2005 | 12/28/2007 | 3/4/2035 | R$ 1,787,135.33 | 6/1/2025 | Ativa | Contrato de Concessão nº 007/2005 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Norte | LT 230 kV MIRANDA II /PERITORO MA | LT 230 kV MIRANDA II /PERITORO C-1 MA | RB | FT LT 230 kV MIRANDA II /PERITORO C-1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,066,720.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV MONTE CLARO /NOVA PRATA 2 RS | LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS | RB | FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS | 057/2001 | IPCA | RBNI | REA 3161/2011 | 9/25/2015 | 12/19/2049 | R$ 1,130,494.86 | 6/1/2025 | Ativa | T2011-133 | Trecho de linha de transmissão em 230 kV, circuito duplo, cabo 636 MCM Grosbeak, totalizando 9 km, refrente à extensão do circuito LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS do ponto de seccionamento do circuito LT 230 kV MONTE CLARO /PASSO FUNDO C-1 RS até a SE NOVA PRATA 2. (Apenas metade da receita. A outra metade consta no módulo LT 230 kV Passo Fundo/Nova Prata 2 C-2 RS) *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | LT 230 kV MONTE CLARO /NOVA PRATA 2 RS | LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS | RB | FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$386,934.76 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV MONTE CLARO /NOVA PRATA 2 RS | LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS | RB | FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS | 057/2001 | IPCA | RBNI | REA 8795/2020 | 5/24/2022 | 8/2/2058 | R$751,070.54 | 6/1/2025 | Ativa | T2020-026 | Recapacitação da LT 230 kV Monte Claro - Nova Prata 2 C2 31,9 km, para novas capacidades de 232 MVA em regime de longa duração e 292 MVA em regime de curta duração *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | LT 230 kV MONTE CLARO /NOVA PRATA 2 RS | LT 230 kV MONTE CLARO /NOVA PRATA 2 C-1 RS | RB | FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$487,990.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV MONTE CLARO /NOVA PRATA 2 RS | LT 230 kV MONTE CLARO /NOVA PRATA 2 C-1 RS | RB | FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-1 RS | 057/2001 | IPCA | RBNI | REA 8795/2020 | 6/15/2022 | 1/31/2059 | R$ 2,518,775.11 | 6/1/2025 | Ativa | T2020-026 | Recapacitação da LT 230 kV Monte Claro - Nova Prata 2 C1 29,5 km, para novas capacidades de 232 MVA em regime de longa duração e 292 MVA em regime de curta duração *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | LT 230 kV MONTE CLARO /VINHEDOS RS | LT 230 kV MONTE CLARO /VINHEDOS C-1 RS | RB | FT LT 230 kV MONTE CLARO /VINHEDOS C-1 RS | 012/2010 | IPCA | RBL | CC 012/2010 | 7/19/2013 | 10/6/2040 | R$ 1,747,089.55 | 6/1/2025 | Ativa | T2010-079 | Contrato de Concessão nº 012/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Sul | LT 230 kV MONTE CLARO /VINHEDOS RS | LT 230 kV MONTE CLARO /VINHEDOS C-1 RS | RB | FT LT 230 kV MONTE CLARO /VINHEDOS C-1 RS | 012/2010 | IPCA | RBNI | DSP 1247/2022 | 11/12/2021 | 10/5/2040 | R$35,688.32 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Monte Claro -Vinhedos C1, originado do seccionamento da Linha de Transmissão 230 kV Monte Claro - Garibaldi C1, e a Subestação seccionadora Vinhedos, com 2 km de extensão. | |||
| Nova Era Ceará | LT 230 kV MORADA NOVA /RUSSAS II CE | LT 230 kV MORADA NOVA /RUSSAS II C-2 CE | RB | FT LT 230 kV MORADA NOVA /RUSSAS II C-2 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$352,902.57 | 6/1/2025 | Prevista | T2024-195-D | - Seccionamento da LT 230 kV Banabuiú – Russas II – C2 na subestação Morada Nova. | ||||
| Nova Era Ceará | LT 230 kV MORADA NOVA /RUSSAS II CE | LT 230 kV MORADA NOVA /RUSSAS II C-1 CE | RB | FT LT 230 kV MORADA NOVA /RUSSAS II C-1 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 6,019,793.35 | 6/1/2025 | Prevista | T2024-195-F | - LT 230 kV Morada Nova - Russas II, C1, CS; | ||||
| AXIA Energia Nordeste | LT 230 kV MORRO CHAPEU II /IRECE BA | LT 230 kV MORRO CHAPEU II /IRECE C-1 BA | RB | FT LT 230 kV MORRO CHAPEU II /IRECE C-1 BA | 009/2011 | IPCA | RBL | CC 009/2011 | 8/6/2017 | 10/13/2041 | R$ 2,602,870.58 | 6/1/2025 | Ativa | T2012-031 | * Considerando o adicional de RGR conforme disposto na RH nº 1.150, de 07/06/2011. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | LT 230 kV MOSSORO II /ACU III RN | LT 230 kV MOSSORO II /ACU III C-2 RN | RB | FT LT 230 kV MOSSORO II /ACU III C-2 RN | 019/2010 | IPCA | RBL | CC 019/2010 | 11/23/2010 | 11/23/2040 | R$600,805.91 | 6/1/2025 | Ativa | T2010-090-B | Rede Básica e ICGLT, C3, 230 kV Paraíso - Açu II; LT, C2, 230 kV Açu II - Mossoró II; (Rede Básica). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | LT 230 kV MOSSORO II /ACU III RN | LT 230 kV MOSSORO II /ACU III C-2 RN | RB | FT LT 230 kV MOSSORO II /ACU III C-2 RN | 019/2010 | IPCA | RBNI | REA 4407/2013 | 5/27/2021 | 12/13/2058 | R$106,052.99 | 6/1/2025 | Ativa | T2018-026 | Receita resultante do seccionamento do circuito LT 230 kV MOSSORO II /ACU II C-2 RN na SE ACU III . Recapacitação de trecho de 12 km da linha de transmissão Mossoró II - Açu II C2, em 230 kV, entre a subestação Açu II e o seccionamento para a subestação Açu III. | ||
| AXIA Energia Nordeste | LT 230 kV MOSSORO II /ACU III RN | LT 230 kV MOSSORO II /ACU III C-2 RN | RB | FT LT 230 kV MOSSORO II /ACU III C-2 RN | 019/2010 | IPCA | RBNI | DSP 1269/2022 | 1/31/2022 | 11/22/2040 | R$43,568.69 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Açu III – Mossoró II C2, originado do seccionamento da Linha de Transmissão 230 kV Açu II – Mossoró II C2, na SE Açu III, com 2,9 km de extensão. | |||
| AXIA Energia Nordeste | LT 230 kV MOSSORO II /ACU III RN | LT 230 kV MOSSORO II /ACU III C-1 RN | RB | FT LT 230 kV MOSSORO II /ACU III C-1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,100,653.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MOSSORO II /ACU III RN | LT 230 kV MOSSORO II /ACU III C-1 RN | RB | FT LT 230 kV MOSSORO II /ACU III C-1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,088,619.56 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MOSSORO II /ACU III RN | LT 230 kV MOSSORO II /ACU III C-1 RN | RB | FT LT 230 kV MOSSORO II /ACU III C-1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,847,329.86 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV MOSSORO II /ACU III RN | LT 230 kV MOSSORO II /ACU III C-1 RN | RB | FT LT 230 kV MOSSORO II /ACU III C-1 RN | 061/2001 | IPCA | RBNI | DSP 1307/2022 | 3/18/2022 | 12/31/2042 | R$24,322.93 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Açu III – Mossoró II C1, originado do seccionamento da Linha de Transmissão 230 kV Açu II – Mossoró II C1, na SE Açu III, com 3,26 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV MOSSORO IV /MOSSORO II RN | LT 230 kV MOSSORO IV /MOSSORO II C-1 RN | RB | FT LT 230 kV MOSSORO IV /MOSSORO II C-1 RN | 018/2012 | IPCA | RBL | CC 018/2012 | 10/28/2017 | 6/1/2042 | R$ 1,983,471.92 | 6/1/2025 | Ativa | T2012-114-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | LT 230 kV N.S.SOCORRO /FAFEN SE | LT 230 kV N.S.SOCORRO /FAFEN C-1 SE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$273,794.39 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV N.S.SOCORRO /FAFEN SE | LT 230 kV N.S.SOCORRO /FAFEN C-1 SE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$768,313.32 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV N.S.SOCORRO /JARDIM SE | LT 230 kV N.S.SOCORRO /JARDIM C-2 SE | RB | FT LT 230 kV N.S.SOCORRO /JARDIM C-2 SE | 005/2012 | IPCA | RBL | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$139,066.03 | 6/1/2025 | Ativa | T2012-057-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | LT 230 kV N.S.SOCORRO /JARDIM SE | LT 230 kV N.S.SOCORRO /JARDIM C-1 SE | RB | FT LT 230 kV N.S.SOCORRO /JARDIM C-1 SE | 005/2012 | IPCA | RBL | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$139,066.03 | 6/1/2025 | Ativa | T2012-057-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | LT 230 kV N.S.SOCORRO /JARDIM SE | LT 230 kV N.S.SOCORRO /JARDIM C-1 SE | RB | FT LT 230 kV N.S.SOCORRO /JARDIM C-1 SE | 005/2012 | IPCA | RBNI | DSP 1080/2022 | 5/17/2021 | 5/9/2042 | R$19,772.77 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito simples, Jardim -Nossa Senhora do Socorro C1, originado do seccionamento da Linha de Transmissão 230 kV Jardim - FAFEN C1, e a subestação seccionadora Nossa Senhora do Socorro, com 1 km de extensão. | |||
| AXIA Energia Nordeste | LT 230 kV N.S.SOCORRO /PENEDO SE/AL | LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL | RB | FT LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL | 005/2008 | IPCA | RBL | CC 005/2008 | 3/17/2008 | 3/17/2038 | R$ 4,248,269.65 | 6/1/2025 | Ativa | T2000-188 | Contrato de Concessão nº 005/2008 *(Considera adicional de RGR relativo à prorrogação do encargo) * (Receita revisada em 18/06/2013)* Receita revisada no reajuste da RAP do ciclo 2018-2019. * Receita revisada em 07-11-2023 | ||
| AXIA Energia Nordeste | LT 230 kV N.S.SOCORRO /PENEDO SE/AL | LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL | RB | FT LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL | 005/2008 | IPCA | RBNI | DSP 1414/2022 | 5/9/2022 | 3/17/2038 | R$105,315.15 | 6/1/2025 | Ativa | Parcela adicional de RAP para Operação e Manutenção de trecho de Linha de Transmissão em 230 kV, circuito simples, Nossa Senhora do Socorro - Penedo, originado do seccionamento da Linha de Transmissão 230 kV Jardim – Penedo na subestação seccionadora Nossa Senhora do Socorro, com 5 km de extensão. *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Nordeste | LT 230 kV NATAL III /NATAL II RN | LT 230 kV NATAL III /NATAL II C-2 RN | RB | FT LT 230 kV NATAL III /NATAL II C-2 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$216,221.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV NATAL III /NATAL II RN | LT 230 kV NATAL III /NATAL II C-2 RN | RB | FT LT 230 kV NATAL III /NATAL II C-2 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$606,752.89 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV NATAL III /NATAL II RN | LT 230 kV NATAL III /NATAL II C-2 RN | RB | FT LT 230 kV NATAL III /NATAL II C-2 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$559,352.03 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV NATAL III /NATAL II RN | LT 230 kV NATAL III /NATAL II C-2 RN | RB | FT LT 230 kV NATAL III /NATAL II C-2 RN | 061/2001 | IPCA | RBNI | DSP 1073/2022 | 6/4/2021 | 12/31/2042 | R$10,873.78 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Natal III-Natal II C2, originado do seccionamento da Linha de Transmissão 230 kV Campina Grande II - Natal II C2, e a subestação seccionadora Natal III, com 1 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV NATAL III /NATAL II RN | LT 230 kV NATAL III /NATAL II C-1 RN | RB | FT LT 230 kV NATAL III /NATAL II C-1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$216,221.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV NATAL III /NATAL II RN | LT 230 kV NATAL III /NATAL II C-1 RN | RB | FT LT 230 kV NATAL III /NATAL II C-1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$606,752.89 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV NATAL III /NATAL II RN | LT 230 kV NATAL III /NATAL II C-1 RN | RB | FT LT 230 kV NATAL III /NATAL II C-1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$559,352.03 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV NATAL III /NATAL II RN | LT 230 kV NATAL III /NATAL II C-1 RN | RB | FT LT 230 kV NATAL III /NATAL II C-1 RN | 061/2001 | IPCA | RBNI | DSP 1073/2022 | 6/4/2021 | 12/31/2042 | R$10,873.78 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Natal III-Natal II C1, originado do seccionamento da Linha de Transmissão 230 kV Campina Grande II - Natal II C1, e a subestação seccionadora Natal III, com 1 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | LT 230 kV NOBRES /NOVA MUTUM MT | LT 230 kV NOBRES /NOVA MUTUM C-1 MT | RB | FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,274,915.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV NOBRES /NOVA MUTUM MT | LT 230 kV NOBRES /NOVA MUTUM C-1 MT | RB | FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,938,668.42 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV NOBRES /NOVA MUTUM MT | LT 230 kV NOBRES /NOVA MUTUM C-1 MT | RB | FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 4,736,662.17 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV NOVA MUTUM /SORRISO MT | LT 230 kV NOVA MUTUM /SORRISO C-1 MT | RB | FT LT 230 kV NOVA MUTUM /SORRISO C-1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,154,468.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV NOVA MUTUM /SORRISO MT | LT 230 kV NOVA MUTUM /SORRISO C-1 MT | RB | FT LT 230 kV NOVA MUTUM /SORRISO C-1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,848,110.56 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV NOVA MUTUM /SORRISO MT | LT 230 kV NOVA MUTUM /SORRISO C-1 MT | RB | FT LT 230 kV NOVA MUTUM /SORRISO C-1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 6,568,002.44 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV OLINDINA /ALAGOINHAS II BA | LT 230 kV OLINDINA /ALAGOINHAS II C-2 BA | RB | FT LT 230 kV OLINDINA /ALAGOINHAS II C-2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,135,334.07 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV OLINDINA /ALAGOINHAS II BA | LT 230 kV OLINDINA /ALAGOINHAS II C-2 BA | RB | FT LT 230 kV OLINDINA /ALAGOINHAS II C-2 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 9/24/2017 | 2/3/2075 | R$16,671.29 | 6/1/2025 | Ativa | T2020-050 | Receita resultante do seccionamento do circuito LT 230 kV CIC. DANTAS /ALAGOINHAS II C-1 BA na SE OLINDINA. Receita resultante do seccionamento do circuito LT 230 kV CIC. DANTAS /CATU C-2 BA na SE ALAGOINHAS II . SUBSTITUIÇÃO DA ESTRUTURA 534 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV OLINDINA /ALAGOINHAS II BA | LT 230 kV OLINDINA /ALAGOINHAS II C-2 BA | RB | FT LT 230 kV OLINDINA /ALAGOINHAS II C-2 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/24/2014 | 11/28/2051 | R$4,254.84 | 6/1/2025 | Ativa | T2020-050 | Receita resultante do seccionamento do circuito LT 230 kV CIC. DANTAS /ALAGOINHAS II C-1 BA na SE OLINDINA. Receita resultante do seccionamento do circuito LT 230 kV CIC. DANTAS /CATU C-2 BA na SE ALAGOINHAS II . SUBSTITUIÇÃO DE CADEIAS DE ISOLADORES DE MESMO TIPO Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV OLINDINA /ALAGOINHAS II BA | LT 230 kV OLINDINA /ALAGOINHAS II C-2 BA | RB | FT LT 230 kV OLINDINA /ALAGOINHAS II C-2 BA | 061/2001 | IPCA | RBNI | DSP 625/2024 | 5/19/2023 | 5/18/2057 | R$1,785.71 | 6/1/2025 | Ativa | T2020-050 | Receita resultante do seccionamento do circuito LT 230 kV CIC. DANTAS /ALAGOINHAS II C-1 BA na SE OLINDINA. Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Cícero Dantas -Alagoinhas II C1, originado do seccionamento da Linha de Transmissão 230 kV Cícero Dantas - Catu C2 na Subestação seccionadora Alagoinhas II, com 0,3 km de extensão. | ||
| AXIA Energia Nordeste | LT 230 kV OLINDINA /ALAGOINHAS II BA | LT 230 kV OLINDINA /ALAGOINHAS II C-1 BA | RB | FT LT 230 kV OLINDINA /ALAGOINHAS II C-1 BA | 061/2001 | IPCA | RBNIA | REA 12983/2022 | R$54,723.83 | 6/1/2025 | Prevista | T2022-113 | Instalar o circuito LT 230 kV OLINDINA /ALAGOINHAS II C-1 BA originado do seccionamento do circuito LT 230 kV OLINDINA /CATU C-1 BA na SE ALAGOINHAS II | ||||
| AXIA Energia Nordeste | LT 230 kV OLINDINA /CATU BA | LT 230 kV OLINDINA /CATU C-1 BA | RB | FT LT 230 kV OLINDINA /CATU C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,198,021.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV OLINDINA /CATU BA | LT 230 kV OLINDINA /CATU C-1 BA | RB | FT LT 230 kV OLINDINA /CATU C-1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 10/1/2017 | 2/10/2075 | R$32,382.73 | 6/1/2025 | Ativa | T2020-050 | Receita resultante do seccionamento do circuito LT 230 kV CIC. DANTAS /CATU C-1 BA na SE OLINDINA. SUBSTITUIÇÃO DA ESTRUTURA 520 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV OLINDINA /CATU BA | LT 230 kV OLINDINA /CATU C-1 BA | RB | FT LT 230 kV OLINDINA /CATU C-1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/24/2014 | 11/28/2051 | R$1,502.19 | 6/1/2025 | Ativa | T2020-050 | Receita resultante do seccionamento do circuito LT 230 kV CIC. DANTAS /CATU C-1 BA na SE OLINDINA. SUBSTITUIÇÃO DE CADEIAS DE ISOLADORES DE MESMO TIPO Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV OLINDINA /CATU BA | LT 230 kV OLINDINA /CATU C-1 BA | RB | FT LT 230 kV OLINDINA /CATU C-1 BA | 061/2001 | IPCA | RBNIA | REA 12983/2022 | R$843,607.46 | 6/1/2025 | Prevista | T2022-113 | Substituição de cadeias de isoladores e cabos para-raios EAR 3/8” por cabos para-raios CAA 176,9 MCM DOTTEREL em aproximadamente 7,5 km da LT 230 kV Olindina - Catu C1. | ||||
| AXIA Energia Nordeste | LT 230 kV OLINDINA /RL (CIC. DANTAS /CATU) BA | LT 230 kV OLINDINA /RL (CIC. DANTAS /CATU) C-2 BA | RB | FT LT 230 kV OLINDINA /RL (CIC. DANTAS /CATU) C-2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$4,745.77 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV OLINDINA /RL (CIC. DANTAS /CATU) BA | LT 230 kV OLINDINA /RL (CIC. DANTAS /CATU) C-2 BA | RB | FT LT 230 kV OLINDINA /RL (CIC. DANTAS /CATU) C-2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$13,317.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV OLINDINA /RL (CIC. DANTAS /CATU) BA | LT 230 kV OLINDINA /RL (CIC. DANTAS /CATU) C-1 BA | RB | FT LT 230 kV OLINDINA /RL (CIC. DANTAS /CATU) C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$4,745.77 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV OLINDINA /RL (CIC. DANTAS /CATU) BA | LT 230 kV OLINDINA /RL (CIC. DANTAS /CATU) C-1 BA | RB | FT LT 230 kV OLINDINA /RL (CIC. DANTAS /CATU) C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$13,317.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV OUROLANDIA II /IRECE BA | LT 230 kV OUROLANDIA II /IRECE C-1 BA | RB | FT LT 230 kV OUROLANDIA II /IRECE C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,368,971.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV OUROLANDIA II /IRECE BA | LT 230 kV OUROLANDIA II /IRECE C-1 BA | RB | FT LT 230 kV OUROLANDIA II /IRECE C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,841,566.61 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV OUROLANDIA II /IRECE BA | LT 230 kV OUROLANDIA II /IRECE C-1 BA | RB | FT LT 230 kV OUROLANDIA II /IRECE C-1 BA | 061/2001 | IPCA | RBNI | REA 9690/2021 | 6/4/2019 | 12/31/2042 | R$144,790.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 230 kV, circuito simples, entre o ponto de seccionamento da Linha de Transmissão 230kV Irecê – Campo Formoso e a Subestação Ourolândia II, com 22 Km de extensão (conforme cadastro Siget). *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV P. AFONSO IV /P.AFONSO III BA/AL | LT 230 kV P. AFONSO IV /P.AFONSO III C-2 BA/AL | RB | FT LT 230 kV P. AFONSO IV /P.AFONSO III C-2 BA/AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$33,220.39 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV P. AFONSO IV /P.AFONSO III BA/AL | LT 230 kV P. AFONSO IV /P.AFONSO III C-2 BA/AL | RB | FT LT 230 kV P. AFONSO IV /P.AFONSO III C-2 BA/AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$93,222.02 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV P. AFONSO IV /P.AFONSO III BA/AL | LT 230 kV P. AFONSO IV /P.AFONSO III C-1 BA/AL | RB | FT LT 230 kV P. AFONSO IV /P.AFONSO III C-1 BA/AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,101.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV P. AFONSO IV /P.AFONSO III BA/AL | LT 230 kV P. AFONSO IV /P.AFONSO III C-1 BA/AL | RB | FT LT 230 kV P. AFONSO IV /P.AFONSO III C-1 BA/AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$73,245.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /BOM NOME AL/PE | LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE | RB | FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,117,605.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /BOM NOME AL/PE | LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE | RB | FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/24/2014 | 11/28/2051 | R$312,769.48 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE CADEIAS DE ISOLADORES DE MESMO TIPO Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /BOM NOME AL/PE | LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE | RB | FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 8,748,527.70 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /CIC. DANTAS AL/BA | LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA | RB | FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,442,245.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /CIC. DANTAS AL/BA | LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA | RB | FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/24/2014 | 11/28/2051 | R$24,085.10 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE CADEIAS DE ISOLADORES DE MESMO TIPO Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /CIC. DANTAS AL/BA | LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA | RB | FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/4/2021 | 1/8/2058 | R$236,585.60 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /CIC. DANTAS AL/BA | LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA | RB | FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA | 061/2001 | IPCA | RBNI | REA 2173/2009 | 9/4/2017 | 7/25/2054 | R$ 2,989,256.06 | 6/1/2025 | Ativa | T2009-157 | Recapacitar a LT 230 kV P. Afonso III/ Cícero Dantas com 134,2 km de extensão, um cabo por fase, CAA 636 MCM GROSBEAK, instalando novas estruturas nos vãos e trocando os isoladores por tipo poliméricos. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /CIC. DANTAS AL/BA | LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA | RB | FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,449,547.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /CIC. DANTAS AL/BA | LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA | RB | FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/24/2014 | 11/28/2051 | R$21,731.67 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE CADEIAS DE ISOLADORES DE MESMO TIPO Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /FLORESTA II AL/PE | LT 230 kV P.AFONSO III /FLORESTA II C-2 AL/PE | RB | FT LT 230 kV P.AFONSO III /FLORESTA II C-2 AL/PE | 061/2001 | IPCA | RBNIA | DSP 2563/2023 | R$138,193.83 | 6/1/2025 | Prevista | T2023-129 | Instalar o circuito LT 230 kV P.AFONSO III /FLORESTA II C-3 AL/PE originado do seccionamento do circuito LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE na SE FLORESTA II | ||||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /FLORESTA II AL/PE | LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE | RB | FT LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,437,336.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /FLORESTA II AL/PE | LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE | RB | FT LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE | 061/2001 | IPCA | RBNI | REA 10264/2021 | 4/5/2019 | 12/31/2042 | R$2,711.75 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de um trecho de LT em 230 kV entre o ponto de seccionamento da Linha de Transmissão 230 kV Paulo Afonso III – Bom Nome C-2 e a Subestação seccionadora Floresta II, com 0,3 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /GARANHUNS II AL/PE | LT 230 kV P.AFONSO III /GARANHUNS II C-3 AL/PE | RB | FT LT 230 kV P.AFONSO III /GARANHUNS II C-3 AL/PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,956,331.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /GARANHUNS II AL/PE | LT 230 kV P.AFONSO III /GARANHUNS II C-3 AL/PE | RB | FT LT 230 kV P.AFONSO III /GARANHUNS II C-3 AL/PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/15/2021 | 2/19/2058 | R$20,273.97 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /GARANHUNS II AL/PE | LT 230 kV P.AFONSO III /GARANHUNS II C-2 AL/PE | RB | FT LT 230 kV P.AFONSO III /GARANHUNS II C-2 AL/PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,956,331.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /GARANHUNS II AL/PE | LT 230 kV P.AFONSO III /GARANHUNS II C-2 AL/PE | RB | FT LT 230 kV P.AFONSO III /GARANHUNS II C-2 AL/PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/15/2021 | 2/19/2058 | R$23,658.55 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /GARANHUNS II AL/PE | LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE | RB | FT LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,741,856.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /GARANHUNS II AL/PE | LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE | RB | FT LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE | 061/2001 | IPCA | RBNI | REA 5654/2016 | 12/15/2017 | 12/14/2050 | R$452,976.91 | 6/1/2025 | Ativa | T2015-068 | Substituição do cabo para raios convencional por 221 km de cabo para raios com 12 fibras óticas, na LT 230 kV Paulo Afonso - Angelim C4. Como a LT 230 kV Paulo Afonso - Angelim C4 foi seccionada na SE Garanhuns II a parcela RAP de RAP foi dividida proporcionalmente entre os trechos resultantes. Valor associado ao trecho LT 230 kV P.AFONSO III /GARANHUNS II. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /GARANHUNS II AL/PE | LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE | RB | FT LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/20/2020 | 6/25/2050 | R$219,501.23 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /ITABAIANA AL/SE | LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE | RB | FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE | 061/2001 | IPCA | RBNI | REA 2823/2011 | 8/13/2013 | 8/12/2046 | R$159,550.84 | 6/1/2025 | Ativa | T2010-053 | Substituir, no segundo circuito da LT 230 kV Paulo Afonso - Itabaiana, os cabos pararraios por CAA 15,42 - DOTTEREL ao longo dos 11 km de saída da SE Paulo Afonso e 11 km para a chegada na SE Itabaiana, totalizando a troca ao longo de 22 km. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /ITABAIANA AL/SE | LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE | RB | FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,341,149.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /ITABAIANA AL/SE | LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE | RB | FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/24/2014 | 11/28/2051 | R$9,563.93 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE CADEIAS DE ISOLADORES DE MESMO TIPO Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /ITABAIANA AL/SE | LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE | RB | FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,569,661.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /ITABAIANA AL/SE | LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE | RB | FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 6,056,425.48 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /ITABAIANA AL/SE | LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE | RB | FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE | 061/2001 | IPCA | RBNI | REA 2823/2011 | 8/13/2013 | 8/12/2046 | R$159,550.84 | 6/1/2025 | Ativa | T2010-053 | Substituir, no primeiro circuito da LT 230 kV Paulo Afonso - Itabaiana, os cabos pararraios por CAA 15,42 - DOTTEREL ao longo dos 11 km de saída da SE Paulo Afonso e 11 km para a chegada na SE Itabaiana, totalizando a troca ao longo de 22 km. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /ITABAIANA AL/SE | LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE | RB | FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,341,149.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /ITABAIANA AL/SE | LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE | RB | FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/24/2014 | 11/28/2051 | R$9,563.93 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE CADEIAS DE ISOLADORES DE MESMO TIPO Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /ITABAIANA AL/SE | LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE | RB | FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,569,661.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /SANTANA II AL | LT 230 kV P.AFONSO III /SANTANA II C-1 AL | RB | FT LT 230 kV P.AFONSO III /SANTANA II C-1 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,570,484.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /SANTANA II AL | LT 230 kV P.AFONSO III /SANTANA II C-1 AL | RB | FT LT 230 kV P.AFONSO III /SANTANA II C-1 AL | 061/2001 | IPCA | RBNI | DSP 1019/2022 | 12/10/2021 | 12/31/2042 | R$177,858.77 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito simples, Paulo Afonso III -Santana II C1, originado do seccionamento da Linha de Transmissão 230 kV Paulo Afonso III - Angelim C1, e a Subestação seccionadora Santana II, com 21,2 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /SANTANA II AL | LT 230 kV P.AFONSO III /SANTANA II C-1 AL | RB | FT LT 230 kV P.AFONSO III /SANTANA II C-1 AL | 061/2001 | IPCA | RBNIA | REA 5824/2016 | R$ - | 6/1/2025 | Prevista | T2015-074 | Aumento do limite de curta duração de 516 A para 621 A, pela eliminação de fator limitante ativo (restauração da altura mínima de segurança). | Empreendimento revogado pela ANEEL, conforme Despacho nº 3.110, de 17.10.2025 | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /TACARATU AL/PE | LT 230 kV P.AFONSO III /TACARATU C-3 AL/PE | RB | FT LT 230 kV P.AFONSO III /TACARATU C-3 AL/PE | 061/2001 | IPCA | RBNIA | DSP 2563/2023 | R$711,043.40 | 6/1/2025 | Prevista | T2023-131 | Instalar o circuito LT 230 kV P.AFONSO III /TACARATU C-1 AL/PE originado do seccionamento do circuito LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE na SE TACARATU | ||||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /TACARATU AL/PE | LT 230 kV P.AFONSO III /TACARATU C-2 AL/PE | RB | FT LT 230 kV P.AFONSO III /TACARATU C-2 AL/PE | 061/2001 | IPCA | RBNIA | REA 14821/2023 | R$ 1,002,004.14 | 6/1/2025 | Prevista | T2023-130 | Instalar o circuito LT 230 kV P.AFONSO III /TACARATU C-2 AL/PE originado do seccionamento do circuito LT 230 kV P.AFONSO III /FLORESTA II C-2 AL/PE na SE TACARATU | ||||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /TACARATU AL/PE | LT 230 kV P.AFONSO III /TACARATU C-1 AL/PE | RB | FT LT 230 kV P.AFONSO III /TACARATU C-1 AL/PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$797,663.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /TACARATU AL/PE | LT 230 kV P.AFONSO III /TACARATU C-1 AL/PE | RB | FT LT 230 kV P.AFONSO III /TACARATU C-1 AL/PE | 061/2001 | IPCA | RBNI | REA 7026/2018 | 12/15/2014 | 12/31/2042 | R$44,880.22 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de um trecho de linha de transmissão em 230 kV entre o ponto de seccionamento da linha de transmissão 230 kV Paulo Afonso III - Bom Nome C1 e a subestação seccionadora Tacaratu, com 7 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /TACARATU AL/PE | LT 230 kV P.AFONSO III /TACARATU C-1 AL/PE | RB | FT LT 230 kV P.AFONSO III /TACARATU C-1 AL/PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/25/2014 | 11/29/2051 | R$20,866.27 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /USINA PA-I AL/BA | LT 230 kV P.AFONSO III /USINA PA-I C-2 AL/BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$14,237.31 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /USINA PA-I AL/BA | LT 230 kV P.AFONSO III /USINA PA-I C-1 AL/BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$14,237.31 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /USINA PA-II AL/BA | LT 230 kV P.AFONSO III /USINA PA-II C-5 AL/BA | RB | FT LT 230 kV P.AFONSO III /USINA PA-II C-5 AL/BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$16,610.19 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /USINA PA-II AL/BA | LT 230 kV P.AFONSO III /USINA PA-II C-4 AL/BA | RB | FT LT 230 kV P.AFONSO III /USINA PA-II C-4 AL/BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$16,610.19 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /USINA PA-II AL/BA | LT 230 kV P.AFONSO III /USINA PA-II C-3 AL/BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$14,237.31 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /USINA PA-II AL/BA | LT 230 kV P.AFONSO III /USINA PA-II C-2 AL/BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$14,237.31 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /USINA PA-II AL/BA | LT 230 kV P.AFONSO III /USINA PA-II C-2 AL/BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$39,952.29 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /USINA PA-II AL/BA | LT 230 kV P.AFONSO III /USINA PA-II C-2 AL/BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$36,831.13 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /USINA PA-II AL/BA | LT 230 kV P.AFONSO III /USINA PA-II C-1 AL/BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$14,237.31 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /USINA PA-III AL/BA | LT 230 kV P.AFONSO III /USINA PA-III C-4 AL/BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$14,237.31 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /USINA PA-III AL/BA | LT 230 kV P.AFONSO III /USINA PA-III C-3 AL/BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$14,237.31 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /USINA PA-III AL/BA | LT 230 kV P.AFONSO III /USINA PA-III C-2 AL/BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$14,237.31 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /USINA PA-III AL/BA | LT 230 kV P.AFONSO III /USINA PA-III C-1 AL/BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$14,237.31 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /ZEBU II AL | LT 230 kV P.AFONSO III /ZEBU II C-2 AL | RB | FT LT 230 kV P.AFONSO III /ZEBU II C-2 AL | 017/2009 | IPCA | RBL | CC 017/2009 | 8/3/2009 | 8/3/2039 | R$222,679.30 | 6/1/2025 | Ativa | T2009-225-B | Contrato de Concessão nº 017/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Nordeste | LT 230 kV P.AFONSO III /ZEBU II AL | LT 230 kV P.AFONSO III /ZEBU II C-1 AL | RB | FT LT 230 kV P.AFONSO III /ZEBU II C-1 AL | 017/2009 | IPCA | RBL | CC 017/2009 | 8/3/2009 | 8/3/2039 | R$222,679.30 | 6/1/2025 | Ativa | T2009-225-B | Contrato de Concessão nº 017/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Norte | LT 230 kV P.DUTRA /PERITORO MA | LT 230 kV P.DUTRA /PERITORO C-1 MA | RB | FT LT 230 kV P.DUTRA /PERITORO C-1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,295,147.77 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV PARAISO /ACU II RN | LT 230 kV PARAISO /ACU II C-3 RN | RB | FT LT 230 kV PARAISO /ACU II C-3 RN | 019/2010 | IPCA | RBL | CC 019/2010 | 11/23/2010 | 11/23/2040 | R$ 4,016,256.52 | 6/1/2025 | Ativa | T2010-090-B | Rede Básica e ICGLT, C3, 230 kV Paraíso - Açu II; LT, C2, 230 kV Açu II - Mossoró II; (Rede Básica). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | LT 230 kV PARAISO /ACU II RN | LT 230 kV PARAISO /ACU II C-2 RN | RB | FT LT 230 kV PARAISO /ACU II C-2 RN | 012/2007 | IPCA | RBL | CC 012/2007 | 6/14/2007 | 6/14/2037 | R$ 3,856,422.20 | 6/1/2025 | Ativa | T2000-117-A | Contrato de Concessão nº 012/2007 *(Considera adicional de RGR relativo à prorrogação do encargo). Receita revisada em 19/06/2012 no reajuste para o Ciclo 2012-2013. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | LT 230 kV PARAISO /LAGOA NOVA II RN | LT 230 kV PARAISO /LAGOA NOVA II C-1 RN | RB | FT LT 230 kV PARAISO /LAGOA NOVA II C-1 RN | 010/2011 | IPCA | RBL | CC 010/2011 | 10/13/2011 | 10/13/2041 | R$ 4,727,181.77 | 6/1/2025 | Ativa | T2012-032-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | LT 230 kV PARAISO /NATAL II RN | LT 230 kV PARAISO /NATAL II C-2 RN | RB | FT LT 230 kV PARAISO /NATAL II C-2 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,400,367.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV PARAISO /NATAL II RN | LT 230 kV PARAISO /NATAL II C-2 RN | RB | FT LT 230 kV PARAISO /NATAL II C-2 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,929,668.46 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV PARAISO /NATAL II RN | LT 230 kV PARAISO /NATAL II C-2 RN | RB | FT LT 230 kV PARAISO /NATAL II C-2 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/13/2021 | 6/17/2058 | R$82,983.47 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV PARAISO /NATAL II RN | LT 230 kV PARAISO /NATAL II C-1 RN | RB | FT LT 230 kV PARAISO /NATAL II C-1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,385,960.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV PARAISO /NATAL II RN | LT 230 kV PARAISO /NATAL II C-1 RN | RB | FT LT 230 kV PARAISO /NATAL II C-1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,889,239.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV PARAISO /NATAL II RN | LT 230 kV PARAISO /NATAL II C-1 RN | RB | FT LT 230 kV PARAISO /NATAL II C-1 RN | 061/2001 | IPCA | RBNI | REA 7761/2019 | 3/31/2017 | 3/30/2050 | R$ 1,393,010.06 | 6/1/2025 | Ativa | Substituição de 1 Cabo Para-raios. Dotterel e/ou EHS 3/8 (O Cabo Para-Raios possui 53,37 km do Cabo Tipo EHS 3/8 e 43,83 km do Cabo Tipo Dotterel) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV PARAISO /NATAL II RN | LT 230 kV PARAISO /NATAL II C-1 RN | RB | FT LT 230 kV PARAISO /NATAL II C-1 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/20/2018 | 4/4/2053 | R$23,756.36 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | LT 230 kV PASSO FUNDO /U.PASSO FUNDO RS | LT 230 kV PASSO FUNDO /U.PASSO FUNDO C-2 RS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$7,292.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 230 kV PASSO FUNDO /U.PASSO FUNDO RS | LT 230 kV PASSO FUNDO /U.PASSO FUNDO C-1 RS | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$7,292.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 230 kV PASSO FUNDO /VILA MARIA RS | LT 230 kV PASSO FUNDO /VILA MARIA C-2 RS | RB | FT LT 230 kV PASSO FUNDO /VILA MARIA C-2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,564,267.61 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV PASSO FUNDO /VILA MARIA RS | LT 230 kV PASSO FUNDO /VILA MARIA C-2 RS | RB | FT LT 230 kV PASSO FUNDO /VILA MARIA C-2 RS | 057/2001 | IPCA | RBNI | REA 3161/2011 | 9/25/2015 | 6/3/2051 | R$603,228.79 | 6/1/2025 | Ativa | T2019-048-C | Receita resultante do seccionamento do circuito LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS na SE VILA MARIA . Trecho de linha de transmissão em 230 kV, circuito duplo, cabo 636 MCM Grosbeak, totalizando 9 km, refrente à extensão do circuito LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS do ponto de seccionamento do circuito LT 230 kV MONTE CLARO /PASSO FUNDO C-1 RS até a SE NOVA PRATA 2. (Apenas metade da receita. A outra metade consta no módulo LT 230 kV Monte Claro /Nova Prata 2 C-2 RS) *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | LT 230 kV PASSO FUNDO /VILA MARIA RS | LT 230 kV PASSO FUNDO /VILA MARIA C-2 RS | RB | FT LT 230 kV PASSO FUNDO /VILA MARIA C-2 RS | 057/2001 | IPCA | RBNI | REA 8795/2020 | 12/5/2022 | 12/5/2050 | R$ 7,252,432.83 | 6/1/2025 | Ativa | T2020-027 | Recapacitação da LT 230 kV Passo Fundo - Vila Maria C2 135,4 km, para novas capacidades de 232 MVA em regime de longa duração e 292 MVA em regime de curta duração | ||
| AXIA Energia Sul | LT 230 kV PASSO FUNDO /VILA MARIA RS | LT 230 kV PASSO FUNDO /VILA MARIA C-2 RS | RB | FT LT 230 kV PASSO FUNDO /VILA MARIA C-2 RS | 057/2001 | IPCA | RBNI | DSP 1128/2024 | 8/24/2023 | 8/23/2057 | R$2,793.69 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Passo Fundo – Vila Maria C1, originado do seccionamento da Linha de Transmissão 230 kV Passo Fundo - Nova Prata 2 C1, e a Subestação seccionadora Vila Maria, com 0,17 km de extensão. | |||
| AXIA Energia Sul | LT 230 kV PASSO FUNDO /VILA MARIA RS | LT 230 kV PASSO FUNDO /VILA MARIA C-1 RS | RB | FT LT 230 kV PASSO FUNDO /VILA MARIA C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,729,366.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV PASSO FUNDO /VILA MARIA RS | LT 230 kV PASSO FUNDO /VILA MARIA C-1 RS | RB | FT LT 230 kV PASSO FUNDO /VILA MARIA C-1 RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,035,179.37 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV PASSO FUNDO /VILA MARIA RS | LT 230 kV PASSO FUNDO /VILA MARIA C-1 RS | RB | FT LT 230 kV PASSO FUNDO /VILA MARIA C-1 RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,570,849.87 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV PASSO FUNDO /VILA MARIA RS | LT 230 kV PASSO FUNDO /VILA MARIA C-1 RS | RB | FT LT 230 kV PASSO FUNDO /VILA MARIA C-1 RS | 057/2001 | IPCA | RBNI | REA 8795/2020 | 11/18/2022 | 7/6/2059 | R$ 11,772,455.30 | 6/1/2025 | Ativa | T2020-027 | Recapacitação da LT 230 kV Passo Fundo - Vila Maria C1 135,5 km, para novas capacidades de 232 MVA em regime de longa duração e 292 MVA em regime de curta duração *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | LT 230 kV PASSO FUNDO /VILA MARIA RS | LT 230 kV PASSO FUNDO /VILA MARIA C-1 RS | RB | FT LT 230 kV PASSO FUNDO /VILA MARIA C-1 RS | 057/2001 | IPCA | RBNI | DSP 1128/2024 | 8/24/2023 | 8/23/2057 | R$2,567.17 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Passo Fundo – Vila Maria C1, originado do seccionamento da Linha de Transmissão 230 kV Passo Fundo - Nova Prata 2 C1, e a Subestação seccionadora Vila Maria, com 0,17 km de extensão. | |||
| AXIA Energia Sul | LT 230 kV PASSO FUNDO /XANXERE ESU RS/SC | LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC | RB | FT LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,250,772.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV PASSO FUNDO /XANXERE ESU RS/SC | LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC | RB | FT LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,195,207.58 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV PASSO FUNDO /XANXERE ESU RS/SC | LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC | RB | FT LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,252,351.27 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV PATO BRANCO /XANXERE ESU PR/SC | LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC | RB | FT LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,257,089.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV PATO BRANCO /XANXERE ESU PR/SC | LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC | RB | FT LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,206,294.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV PATO BRANCO /XANXERE ESU PR/SC | LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC | RB | FT LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC | 057/2001 | IPCA | RBNI | REA 8314/2019 | 1/31/2023 | 2/2/2053 | R$24,290.07 | 6/1/2025 | Ativa | Aquisição e instalação de transformador de potencial do tipo capacitivo - TPC 525 kV, em substituição aos cabos de "potencial device" do banco de autotransformadores (ATF 3) do fabricante Mitsubishi.. Risco de sinistro nos autotransformadores, pois os cabos de "potencial device" que se conectam à bucha estão degradados, podendo causar a explosão da bucha e do equipamento. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV PAU FERRO /C.GRANDE II PE/PB | LT 230 kV PAU FERRO /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV PAU FERRO /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,813,850.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV PAU FERRO /GOIANINHA PE | LT 230 kV PAU FERRO /GOIANINHA C-1 PE | RB | FT LT 230 kV PAU FERRO /GOIANINHA C-1 PE | 061/2001 | IPCA | RBNI | REA 3677/2012 | 5/20/2019 | 1/26/2055 | R$ 1,314,981.70 | 6/1/2025 | Ativa | T2012-062 | Instalar o circuito LT 230 kV PAU FERRO /GOIANINHA C-1 PE originado do seccionamento do circuito LT 230 kV MIRUEIRA /GOIANINHA C-1 PE na SE PAU FERRO *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV PAU FERRO /GOIANINHA PE | LT 230 kV PAU FERRO /GOIANINHA C-1 PE | RB | FT LT 230 kV PAU FERRO /GOIANINHA C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$638,853.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV PAU FERRO /GOIANINHA PE | LT 230 kV PAU FERRO /GOIANINHA C-1 PE | RB | FT LT 230 kV PAU FERRO /GOIANINHA C-1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,792,731.08 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV PAU FERRO /GOIANINHA PE | LT 230 kV PAU FERRO /GOIANINHA C-1 PE | RB | FT LT 230 kV PAU FERRO /GOIANINHA C-1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,652,679.02 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV PAU FERRO /MIRUEIRA II PE | LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE | RB | FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE | 061/2001 | IPCA | RBNI | REA 3677/2012 | 5/20/2019 | 9/29/2055 | R$800,004.36 | 6/1/2025 | Ativa | T2012-062 | Instalar o circuito LT 230 kV PAU FERRO /MIRUEIRA C-2 PE originado do seccionamento do circuito LT 230 kV MIRUEIRA /GOIANINHA C-1 PE na SE PAU FERRO. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV PAU FERRO /MIRUEIRA II PE | LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE | RB | FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE | 061/2001 | IPCA | RBNI | REA 3677/2012 | 5/20/2019 | 5/23/2056 | R$927,290.61 | 6/1/2025 | Ativa | T2012-062 | Reencabeçamento da LT 230 kV Pau Ferro/Mirueira C-2 da SE Mirueira para a SE Mirueira II. A conexão entre os pátios de 230 kV das duas subestações deverá ser realizada através da instalação de circuito de 0,5 km de extensão, em cabos subterrâneos. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV PAU FERRO /MIRUEIRA II PE | LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE | RB | FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$275,619.69 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV PAU FERRO /MIRUEIRA II PE | LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE | RB | FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$773,435.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV PAU FERRO /MIRUEIRA II PE | LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE | RB | FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$713,012.95 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV PAU FERRO /SANTA RITA II PE/PB | LT 230 kV PAU FERRO /SANTA RITA II C-1 PE/PB | RB | FT LT 230 kV PAU FERRO /SANTA RITA II C-1 PE/PB | 017/2009 | IPCA | RBL | CC 017/2009 | 8/21/2012 | 8/3/2039 | R$ 8,066,823.42 | 6/1/2025 | Ativa | T2009-225-A | Contrato de Concessão nº 017/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Norte | LT 230 kV PERITORO /CAXIAS II MA | LT 230 kV PERITORO /CAXIAS II C-1 MA | RB | FT LT 230 kV PERITORO /CAXIAS II C-1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,808,679.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV PICOS /TAUA II PI/CE | LT 230 kV PICOS /TAUA II C-1 PI/CE | RB | FT LT 230 kV PICOS /TAUA II C-1 PI/CE | 012/2007 | IPCA | RBL | CC 012/2007 | 6/14/2007 | 6/14/2037 | R$ 8,375,939.63 | 6/1/2025 | Ativa | T2000-117-B | Contrato de Concessão nº 012/2007 *(Considera adicional de RGR relativo à prorrogação do encargo). Receita revisada em 19/06/2012 no reajuste para o Ciclo 2012-2013. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | LT 230 kV PIMENTA BUENO /VILHENA RO | LT 230 kV PIMENTA BUENO /VILHENA C-3 RO | RB | FT LT 230 kV PIMENTA BUENO /VILHENA C-3 RO | 021/2009 | IPCA | RBL | CC 021/2009 | 10/28/2015 | 11/19/2039 | R$ 13,796,855.87 | 6/1/2025 | Ativa | T2009-245 | *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Norte | LT 230 kV PIMENTA BUENO /VILHENA RO | LT 230 kV PIMENTA BUENO /VILHENA C-1 RO | RB | FT LT 230 kV PIMENTA BUENO /VILHENA C-1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,487,319.32 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV PIRAPAMA II /SUAPE II PE | LT 230 kV PIRAPAMA II /SUAPE II C-2 PE | RB | FT LT 230 kV PIRAPAMA II /SUAPE II C-2 PE | 006/2009 | IPCA | RBL | CC 006/2009 | 1/28/2009 | 1/28/2039 | R$ 1,226,253.54 | 6/1/2025 | Ativa | T2009-199 | Contrato de Concessão nº 006/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Nordeste | LT 230 kV PIRAPAMA II /SUAPE II PE | LT 230 kV PIRAPAMA II /SUAPE II C-1 PE | RB | FT LT 230 kV PIRAPAMA II /SUAPE II C-1 PE | 006/2009 | IPCA | RBL | CC 006/2009 | 1/28/2009 | 1/28/2039 | R$ 1,226,253.54 | 6/1/2025 | Ativa | T2009-199 | Contrato de Concessão nº 006/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia | LT 230 kV PIRINEUS /XAVANTES GO | LT 230 kV PIRINEUS /XAVANTES C-2 GO | RB | FT LT 230 kV PIRINEUS /XAVANTES C-2 GO | 014/2011 | IPCA | RBL | CC 014/2011 | 6/8/2018 | 12/9/2041 | R$ 4,813,405.37 | 6/1/2025 | Ativa | T2012-036 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia | LT 230 kV PIRINEUS /XAVANTES GO | LT 230 kV PIRINEUS /XAVANTES C-1 GO | RB | FT LT 230 kV PIRINEUS /XAVANTES C-1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$868,246.24 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV PIRINEUS /XAVANTES GO | LT 230 kV PIRINEUS /XAVANTES C-1 GO | RB | FT LT 230 kV PIRINEUS /XAVANTES C-1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,331,788.32 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV PIRINEUS /XAVANTES GO | LT 230 kV PIRINEUS /XAVANTES C-1 GO | RB | FT LT 230 kV PIRINEUS /XAVANTES C-1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 3,571,855.44 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| NOVA ERA TERESINA | LT 230 kV PIRIPIRI /IBIAPINA II PI/CE | LT 230 kV PIRIPIRI /IBIAPINA II C-3 PI/CE | RB | FT LT 230 kV PIRIPIRI /IBIAPINA II C-3 PI/CE | 004/2024 | IPCA | RBL | CC 004/2024 | R$ 8,475,667.61 | 6/1/2025 | Prevista | T2024-193-B | LT 230kV Ibiapina II – Piripiri C3 | ||||
| AXIA Energia Nordeste | LT 230 kV PIRIPIRI /IBIAPINA II PI/CE | LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE | RB | FT LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,386,396.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV PIRIPIRI /IBIAPINA II PI/CE | LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE | RB | FT LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE | 061/2001 | IPCA | RBNI | REA 5987/2016 | 11/7/2023 | 11/6/2051 | R$803,399.03 | 6/1/2025 | Ativa | T2016-048 | Recapacitar a LT 230 kV PIRIPIRI - SOBRAL (seccionada na SE Ibiapina II) corrente de curta duração de 595 A para 630 A, com inserção de estruturas metálicas e substituição de trechos de cabo condutor e para-raios. Trecho LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE. | ||
| AXIA Energia Nordeste | LT 230 kV PIRIPIRI /IBIAPINA II PI/CE | LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE | RB | FT LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE | 061/2001 | IPCA | RBNI | REA 10142/2021 | 2/10/2021 | 12/31/2042 | R$53,287.54 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 230 kV, circuito duplo, entre o ponto de seccionamento da linha de transmissão 230 kV Sobral II - Piripiri e a subestação seccionadora Ibiapina II, com 11 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV PIRIPIRI /IBIAPINA II PI/CE | LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE | RB | FT LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2016 | 1/4/2054 | R$101,471.76 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV PITUACU /NARANDIBA BA | LT 230 kV PITUACU /NARANDIBA C-2 BA | RB | FT LT 230 kV PITUACU /NARANDIBA C-2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$67,425.11 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV PITUACU /NARANDIBA BA | LT 230 kV PITUACU /NARANDIBA C-2 BA | RB | FT LT 230 kV PITUACU /NARANDIBA C-2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$189,206.26 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV PITUACU /NARANDIBA BA | LT 230 kV PITUACU /NARANDIBA C-1 BA | RB | FT LT 230 kV PITUACU /NARANDIBA C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$67,425.11 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV PITUACU /RL (COTEGIPE /MATATU) BA/PE | LT 230 kV PITUACU /RL (COTEGIPE /MATATU) C-1 BA/PE | RB | FT LT 230 kV PITUACU /RL (COTEGIPE /MATATU) C-1 BA/PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$47,457.69 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV PITUACU /RL (COTEGIPE /MATATU) BA/PE | LT 230 kV PITUACU /RL (COTEGIPE /MATATU) C-1 BA/PE | RB | FT LT 230 kV PITUACU /RL (COTEGIPE /MATATU) C-1 BA/PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$133,174.31 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV PONTA GROSSA /PONTA G NORTE PR | LT 230 kV PONTA GROSSA /PONTA G NORTE C-1 PR | RB | FT LT 230 kV PONTA GROSSA /PONTA G NORTE C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$252,681.21 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV PONTA GROSSA /PONTA G NORTE PR | LT 230 kV PONTA GROSSA /PONTA G NORTE C-1 PR | RB | FT LT 230 kV PONTA GROSSA /PONTA G NORTE C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$443,476.28 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV PONTA GROSSA /PONTA G NORTE PR | LT 230 kV PONTA GROSSA /PONTA G NORTE C-1 PR | RB | FT LT 230 kV PONTA GROSSA /PONTA G NORTE C-1 PR | 057/2001 | IPCA | RBNI | DSP 1281/2022 | 4/18/2022 | 12/31/2042 | R$19,170.40 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Ponta Grossa-Ponta Grossa Norte C1, originado do seccionamento da Linha de Transmissão 230 kV Areia - Ponta Grossa Norte C1, e a Subestação seccionadora Ponta Grossa, com 2,83 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | LT 230 kV POVO NOVO /QUINTA RS | LT 230 kV POVO NOVO /QUINTA C-1 RS | RB | FT LT 230 kV POVO NOVO /QUINTA C-1 RS | 004/2012 | IPCA | RBL | CC 004/2012 | 12/9/2014 | 5/10/2042 | R$ 1,055,270.21 | 6/1/2025 | Ativa | T2012-074-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Sul | LT 230 kV POVO NOVO /QUINTA RS | LT 230 kV POVO NOVO /QUINTA C-1 RS | RB | FT LT 230 kV POVO NOVO /QUINTA C-1 RS | 004/2012 | IPCA | RBNI | DSP 1446/2022 | 9/30/2015 | 5/9/2042 | R$34,395.00 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Povo Novo-Quinta C1, originado do seccionamento da Linha de Transmissão 230 kV Camaquã 3 - Quinta C1, e a Subestação seccionadora Povo Novo, com 2 km de extensão. | |||
| AXIA Energia Sul | LT 230 kV PRE.MEDICI /SANTA CRUZ 1 RS | LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS | RB | FT LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS | 004/2008 | IPCA | RBL | CC 004/2008 | 3/17/2008 | 3/17/2038 | R$ 8,401,373.10 | 6/1/2025 | Ativa | T2000-187 | Contrato de Concessão nº 004/2008 *(Considera adicional de RGR relativo à prorrogação do encargo) * (Receita revisada em 18/06/2013)* Receita revisada no reajuste da RAP do ciclo 2018-2019. * Receita revisada em 07-11-2023 | ||
| AXIA Energia Nordeste | LT 230 kV QUIXERE /MOSSORO II CE/RN | LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN | RB | FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$912,647.97 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV QUIXERE /MOSSORO II CE/RN | LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN | RB | FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,561,044.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV QUIXERE /MOSSORO II CE/RN | LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN | RB | FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN | 061/2001 | IPCA | RBNI | REA 6894/2018 | 11/12/2014 | 12/31/2042 | R$1,923.44 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de um trecho de linha de transmissão em 230 kV entre o ponto de seccionamento da linha de transmissão 230 kV Russas II - Mossoró II e a subestação seccionadora Quixeré, com 300 m de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV RECIFE II /GOIANINHA PE | LT 230 kV RECIFE II /GOIANINHA C-2 PE | RB | FT LT 230 kV RECIFE II /GOIANINHA C-2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,028,665.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RECIFE II /GOIANINHA PE | LT 230 kV RECIFE II /GOIANINHA C-1 PE | RB | FT LT 230 kV RECIFE II /GOIANINHA C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,028,665.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RECIFE II /GOIANINHA PE | LT 230 kV RECIFE II /GOIANINHA C-1 PE | RB | FT LT 230 kV RECIFE II /GOIANINHA C-1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/30/2012 | 9/29/2045 | R$551,655.55 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV RECIFE II /JABOATAO II PE | LT 230 kV RECIFE II /JABOATAO II C-1 PE | RB | FT LT 230 kV RECIFE II /JABOATAO II C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$134,706.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RECIFE II /JABOATAO II PE | LT 230 kV RECIFE II /JABOATAO II C-1 PE | RB | FT LT 230 kV RECIFE II /JABOATAO II C-1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$378,008.23 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RECIFE II /JABOATAO II PE | LT 230 kV RECIFE II /JABOATAO II C-1 PE | RB | FT LT 230 kV RECIFE II /JABOATAO II C-1 PE | 061/2001 | IPCA | RBNI | REA 10092/2021 | 2/23/2021 | 12/31/2042 | R$152,889.62 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 230 kV, circuito duplo, entre o ponto de seccionamento da linha de transmissão 230 kV Recife II - Pirapama II e a subestação seccionadora Jaboatão II, com 14 Km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV RECIFE II /JOAIRAM PE | LT 230 kV RECIFE II /JOAIRAM C-3 PE | RB | FT LT 230 kV RECIFE II /JOAIRAM C-3 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$127,934.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RECIFE II /JOAIRAM PE | LT 230 kV RECIFE II /JOAIRAM C-2 PE | RB | FT LT 230 kV RECIFE II /JOAIRAM C-2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$127,934.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RECIFE II /JOAIRAM PE | LT 230 kV RECIFE II /JOAIRAM C-1 PE | RB | FT LT 230 kV RECIFE II /JOAIRAM C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$162,086.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RECIFE II /MIRUEIRA PE | LT 230 kV RECIFE II /MIRUEIRA C-3 PE | RB | FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$574,968.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RECIFE II /MIRUEIRA PE | LT 230 kV RECIFE II /MIRUEIRA C-3 PE | RB | FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,613,457.98 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RECIFE II /MIRUEIRA PE | LT 230 kV RECIFE II /MIRUEIRA C-2 PE | RB | FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$453,822.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RECIFE II /MIRUEIRA PE | LT 230 kV RECIFE II /MIRUEIRA C-2 PE | RB | FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,273,503.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RECIFE II /MIRUEIRA PE | LT 230 kV RECIFE II /MIRUEIRA C-1 PE | RB | FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$446,619.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RECIFE II /MIRUEIRA PE | LT 230 kV RECIFE II /MIRUEIRA C-1 PE | RB | FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,253,289.32 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RECIFE II /PAU FERRO PE | LT 230 kV RECIFE II /PAU FERRO C-2 PE | RB | FT LT 230 kV RECIFE II /PAU FERRO C-2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$478,314.90 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RECIFE II /PAU FERRO PE | LT 230 kV RECIFE II /PAU FERRO C-2 PE | RB | FT LT 230 kV RECIFE II /PAU FERRO C-2 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,342,232.44 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RECIFE II /PAU FERRO PE | LT 230 kV RECIFE II /PAU FERRO C-1 PE | RB | FT LT 230 kV RECIFE II /PAU FERRO C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$478,314.90 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RECIFE II /PAU FERRO PE | LT 230 kV RECIFE II /PAU FERRO C-1 PE | RB | FT LT 230 kV RECIFE II /PAU FERRO C-1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,342,232.44 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RECIFE II /PIRAPAMA II PE | LT 230 kV RECIFE II /PIRAPAMA II C-2 PE | RB | FT LT 230 kV RECIFE II /PIRAPAMA II C-2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$437,398.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RECIFE II /PIRAPAMA II PE | LT 230 kV RECIFE II /PIRAPAMA II C-2 PE | RB | FT LT 230 kV RECIFE II /PIRAPAMA II C-2 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,227,414.96 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RECIFE II /PIRAPAMA II PE | LT 230 kV RECIFE II /PIRAPAMA II C-2 PE | RB | FT LT 230 kV RECIFE II /PIRAPAMA II C-2 PE | 061/2001 | IPCA | RBNIA | REA 8328/2019 | R$33,831.10 | 6/1/2025 | Prevista | T2019-075 | Reencabeçamento da LT 230 kV Recife II-Pirapama II C-2 da SE Recife II para a SE Jaboatão II, com a construção de trecho de linha em 230 kV com 0,1 km de extensão entre a SE Jaboatão II e o ponto de derivação da antiga LT 230 kV Recife II-Pirapama II C-2. | ||||
| AXIA Energia Nordeste | LT 230 kV RECIFE II /PIRAPAMA II PE | LT 230 kV RECIFE II /PIRAPAMA II C-2 PE | RB | FT LT 230 kV RECIFE II /PIRAPAMA II C-2 PE | 061/2001 | IPCA | RBNIA | REA 8328/2019 | R$881,877.33 | 6/1/2025 | Prevista | T2019-075 | Desmontagem do trecho de 230 kVentre a SE Recife II e o ponto de derivação da LT 230 kV Pirapama II - Recife II para a SE Jaboatão II em virtude do reencabeçamento desta LT da SE Recife II para a SE Jaboatão II. O trecho a ser desmontado tem 4 km de extensão. | ||||
| AXIA Energia Nordeste | LT 230 kV RIACHAO II /EXTREMOZ II RN | LT 230 kV RIACHAO II /EXTREMOZ II C-1 RN | RB | FT LT 230 kV RIACHAO II /EXTREMOZ II C-1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,211,091.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RIACHAO II /EXTREMOZ II RN | LT 230 kV RIACHAO II /EXTREMOZ II C-1 RN | RB | FT LT 230 kV RIACHAO II /EXTREMOZ II C-1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,398,527.02 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RIACHAO II /EXTREMOZ II RN | LT 230 kV RIACHAO II /EXTREMOZ II C-1 RN | RB | FT LT 230 kV RIACHAO II /EXTREMOZ II C-1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 3,133,026.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RIACHAO II /EXTREMOZ II RN | LT 230 kV RIACHAO II /EXTREMOZ II C-1 RN | RB | FT LT 230 kV RIACHAO II /EXTREMOZ II C-1 RN | 061/2001 | IPCA | RBNI | REA 10141/2021 | 8/15/2016 | 12/31/2042 | R$46,808.78 | 6/1/2025 | Ativa | T2023-155 | Receita resultante do seccionamento do circuito LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN na SE RIACHAO II. Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 230 kV, circuito simples, entre o ponto de seccionamento da linha de transmissão 230 kV Campina Grande II - Natal III e a subestação seccionadora Extremoz II, com 16,5 km de extensão. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV RIACHAO II /EXTREMOZ II RN | LT 230 kV RIACHAO II /EXTREMOZ II C-1 RN | RB | FT LT 230 kV RIACHAO II /EXTREMOZ II C-1 RN | 061/2001 | IPCA | RBNI | REA 10226/2021 | 1/27/2017 | 12/31/2042 | R$17,151.87 | 6/1/2025 | Ativa | T2023-155 | Receita resultante do seccionamento do circuito LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN na SE RIACHAO II. Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 230 kV Campina Grande III-Extremoz II C1, em circuito duplo, originado do seccionamento da linha de transmissão 230 kV Campina Grande II - Extremoz II e a subestação seccionadora Campina Grande III, com 6,5 km de extensão. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV RIACHAO II /EXTREMOZ II RN | LT 230 kV RIACHAO II /EXTREMOZ II C-1 RN | RB | FT LT 230 kV RIACHAO II /EXTREMOZ II C-1 RN | 061/2001 | IPCA | RBNI | DSP 1151/2024 | 11/3/2023 | 11/2/2057 | R$13,282.38 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito simples, Riachão II-Extremoz II C1, originado do seccionamento da Linha de Transmissão 230 kV Campina Grande III - Extremoz II C1 na Subestação seccionadora Riachão II, com 1,4 km de extensão. | |||
| AXIA Energia Nordeste | LT 230 kV RIACHAO II /EXTREMOZ II RN | LT 230 kV RIACHAO II /EXTREMOZ II C-1 RN | RB | FT LT 230 kV RIACHAO II /EXTREMOZ II C-1 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/16/2018 | 8/15/2052 | R$83,707.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | LT 230 kV RIB.GONCALVES /BALSAS PI/MA | LT 230 kV RIB.GONCALVES /BALSAS C-1 PI/MA | RB | FT LT 230 kV RIB.GONCALVES /BALSAS C-1 PI/MA | 001/2009 | IPCA | RBL | CC 001/2009 | 1/28/2009 | 1/28/2039 | R$ 2,816,133.36 | 6/1/2025 | Ativa | T2009-195 | Contrato de Concessão nº 001/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Nordeste | LT 230 kV RIBEIRAO /RECIFE II PE | LT 230 kV RIBEIRAO /RECIFE II C-2 PE | RB | FT LT 230 kV RIBEIRAO /RECIFE II C-2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$816,881.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RIBEIRAO /RECIFE II PE | LT 230 kV RIBEIRAO /RECIFE II C-2 PE | RB | FT LT 230 kV RIBEIRAO /RECIFE II C-2 PE | 061/2001 | IPCA | RBNI | REA 3817/2013 | 8/20/2019 | 8/23/2056 | R$54,391.09 | 6/1/2025 | Ativa | T2012-106 | Instalar o circuito LT 230 kV RIBEIRAO /RECIFE II C-2 PE originado do seccionamento do circuito LT 230 kV ANGELIM /RECIFE II C-2 PE na SE RIBEIRAO *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV RIBEIRAO /RECIFE II PE | LT 230 kV RIBEIRAO /RECIFE II C-1 PE | RB | FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE | 061/2001 | IPCA | RBNI | REA 2823/2011 | 2/1/2016 | 8/16/2052 | R$ 2,255,863.65 | 6/1/2025 | Ativa | T2010-051 | Recapacitação dos 56,5 km do primeiro circuito da Linha de Transmissão 230 kV Ribeirão - Recife II, circuito simples, com ampliação do limite de carregamento de curta duração de 437 A para 621 A, por meio de inclusão de estruturas e substituição do cabo condutor e dos cabos pararraios. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV RIBEIRAO /RECIFE II PE | LT 230 kV RIBEIRAO /RECIFE II C-1 PE | RB | FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,033,117.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RIBEIRAO /RECIFE II PE | LT 230 kV RIBEIRAO /RECIFE II C-1 PE | RB | FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,899,102.27 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RIBEIRAO /RECIFE II PE | LT 230 kV RIBEIRAO /RECIFE II C-1 PE | RB | FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,672,618.08 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV RIO CLARO 2 /RONDONOPOLIS GO/MT | LT 230 kV RIO CLARO 2 /RONDONOPOLIS C-1 GO/MT | RB | FT LT 230 kV RIO CLARO 2 /RONDONOPOLIS C-1 GO/MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,282,573.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV RIO CLARO 2 /RONDONOPOLIS GO/MT | LT 230 kV RIO CLARO 2 /RONDONOPOLIS C-1 GO/MT | RB | FT LT 230 kV RIO CLARO 2 /RONDONOPOLIS C-1 GO/MT | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,616,807.92 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV RIO CLARO 2 /RONDONOPOLIS GO/MT | LT 230 kV RIO CLARO 2 /RONDONOPOLIS C-1 GO/MT | RB | FT LT 230 kV RIO CLARO 2 /RONDONOPOLIS C-1 GO/MT | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 13,879,056.27 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV RIO CLARO 2 /RONDONOPOLIS GO/MT | LT 230 kV RIO CLARO 2 /RONDONOPOLIS C-1 GO/MT | RB | FT LT 230 kV RIO CLARO 2 /RONDONOPOLIS C-1 GO/MT | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/5/2018 | 12/9/2055 | R$42,108.42 | 6/1/2025 | Ativa | T2018-075 | Receita resultante do seccionamento do circuito LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT na SE RIO CLARO 2. Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||
| AXIA Energia | LT 230 kV RIO CLARO 2 /RONDONOPOLIS GO/MT | LT 230 kV RIO CLARO 2 /RONDONOPOLIS C-1 GO/MT | RB | FT LT 230 kV RIO CLARO 2 /RONDONOPOLIS C-1 GO/MT | 062/2001 | IPCA | RBNI | DSP 488/2025 | 12/4/2024 | 12/3/2059 | R$2,758.28 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Rio Claro 2-Rondonópolis C1, originado do seccionamento da Linha de Transmissão 230 kV Rio Verde Furnas - Rondonópolis C1 na Subestação seccionadora Rio Claro 2, com 0,2 km de extensão. | |||
| AXIA Energia Nordeste | LT 230 kV RIO LARGO II /ARAPIRACA III AL | LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL | RB | FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,597,118.98 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RIO LARGO II /ARAPIRACA III AL | LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL | RB | FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,481,785.73 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RIO LARGO II /ARAPIRACA III AL | LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL | RB | FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 4,131,658.86 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RIO LARGO II /ARAPIRACA III AL | LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL | RB | FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL | 061/2001 | IPCA | RBNI | REA 10134/2021 | 8/15/2016 | 12/31/2042 | R$247,176.05 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 230 kV, circuito duplo, entre o ponto de seccionamento da linha de transmissão 230 kV Rio Largo II – Penedo e a subestação seccionadora Arapiraca III, com 46 Km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV RIO LARGO II /ARAPIRACA III AL | LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL | RB | FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/17/2022 | 4/16/2050 | R$571,698.79 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV RIO LARGO II /BRASKEM AL | LT 230 kV RIO LARGO II /BRASKEM C-1 AL | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$465,815.52 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV RIO LARGO II /BRASKEM AL | LT 230 kV RIO LARGO II /BRASKEM C-1 AL | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,307,157.07 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV RIO LARGO II /BRASKEM AL | LT 230 kV RIO LARGO II /BRASKEM C-1 AL | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/19/2022 | 6/18/2050 | R$46,298.75 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | LT 230 kV RIO VERDE FUR /BARRA PEIXE GO/MT | LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT | RB | FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 5,209,477.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV RIO VERDE FUR /BARRA PEIXE GO/MT | LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT | RB | FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 19,990,729.94 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV RIO VERDE FUR /BARRA PEIXE GO/MT | LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT | RB | FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 21,431,132.64 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV RIO VERDE FUR /BARRA PEIXE GO/MT | LT 230 kV RIO VERDE FUR /BARRA PEIXE C-1 GO/MT | RB | FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-1 GO/MT | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 5,209,477.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV RIO VERDE FUR /C. DOURADA GO | LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO | RB | FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,048,620.25 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV RIO VERDE FUR /C. DOURADA GO | LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO | RB | FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 11,698,705.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV RIO VERDE FUR /C. DOURADA GO | LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO | RB | FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 12,541,638.95 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV RIO VERDE FUR /RIO CLARO 2 GO | LT 230 kV RIO VERDE FUR /RIO CLARO 2 C-1 GO | RB | FT LT 230 kV RIO VERDE FUR /RIO CLARO 2 C-1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$860,308.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV RIO VERDE FUR /RIO CLARO 2 GO | LT 230 kV RIO VERDE FUR /RIO CLARO 2 C-1 GO | RB | FT LT 230 kV RIO VERDE FUR /RIO CLARO 2 C-1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,301,328.92 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV RIO VERDE FUR /RIO CLARO 2 GO | LT 230 kV RIO VERDE FUR /RIO CLARO 2 C-1 GO | RB | FT LT 230 kV RIO VERDE FUR /RIO CLARO 2 C-1 GO | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/5/2018 | 12/9/2055 | R$10,016.08 | 6/1/2025 | Ativa | T2018-075 | Receita resultante do seccionamento do circuito LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT na SE RIO CLARO 2. Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||
| AXIA Energia | LT 230 kV RIO VERDE FUR /RIO CLARO 2 GO | LT 230 kV RIO VERDE FUR /RIO CLARO 2 C-1 GO | RB | FT LT 230 kV RIO VERDE FUR /RIO CLARO 2 C-1 GO | 062/2001 | IPCA | RBNI | DSP 488/2025 | 12/4/2024 | 12/3/2059 | R$2,758.28 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Rio Verde Furnas -Rio Claro 2 C1, originado do seccionamento da Linha de Transmissão 230 kV Rio Verde Furnas - Rondonópolis C1 na Subestação seccionadora Rio Claro 2, com 0,2 km de extensão. | |||
| AXIA Energia Norte | LT 230 kV RONDONOPOLIS /COXIPO MT | LT 230 kV RONDONOPOLIS /COXIPO C-2 MT | RB | FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 4,083,405.09 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV RONDONOPOLIS /COXIPO MT | LT 230 kV RONDONOPOLIS /COXIPO C-2 MT | RB | FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 8,864,761.05 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV RONDONOPOLIS /COXIPO MT | LT 230 kV RONDONOPOLIS /COXIPO C-2 MT | RB | FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 8,502,165.92 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV RONDONOPOLIS /COXIPO MT | LT 230 kV RONDONOPOLIS /COXIPO C-2 MT | RB | FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/23/2020 | 11/26/2050 | R$45,514.80 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | LT 230 kV RONDONOPOLIS /COXIPO MT | LT 230 kV RONDONOPOLIS /COXIPO C-1 MT | RB | FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 4,083,405.09 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV RONDONOPOLIS /COXIPO MT | LT 230 kV RONDONOPOLIS /COXIPO C-1 MT | RB | FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 8,864,761.05 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RUSSAS II /BANABUIU CE | LT 230 kV RUSSAS II /BANABUIU C-1 CE | RB | FT LT 230 kV RUSSAS II /BANABUIU C-1 CE | 018/2012 | IPCA | RBL | CC 018/2012 | 12/15/2020 | 6/1/2042 | R$ 6,892,639.51 | 6/1/2025 | Ativa | T2012-114-C | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | LT 230 kV RUSSAS II /QUIXERE CE | LT 230 kV RUSSAS II /QUIXERE C-1 CE | RB | FT LT 230 kV RUSSAS II /QUIXERE C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$456,323.98 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RUSSAS II /QUIXERE CE | LT 230 kV RUSSAS II /QUIXERE C-1 CE | RB | FT LT 230 kV RUSSAS II /QUIXERE C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,280,522.20 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV RUSSAS II /QUIXERE CE | LT 230 kV RUSSAS II /QUIXERE C-1 CE | RB | FT LT 230 kV RUSSAS II /QUIXERE C-1 CE | 061/2001 | IPCA | RBNI | REA 6894/2018 | 11/12/2014 | 12/31/2042 | R$1,923.44 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de um trecho de linha de transmissão em 230 kV entre o ponto de seccionamento da linha de transmissão 230 kV Russas II - Mossoró II e a subestação seccionadora Quixeré, com 300 m de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | LT 230 kV S. OSORIO /PATO BRANCO PR | LT 230 kV S. OSORIO /PATO BRANCO C-1 PR | RB | FT LT 230 kV S. OSORIO /PATO BRANCO C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,356,582.27 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV S. OSORIO /PATO BRANCO PR | LT 230 kV S. OSORIO /PATO BRANCO C-1 PR | RB | FT LT 230 kV S. OSORIO /PATO BRANCO C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,380,913.27 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV S. OSORIO /U.S.OSORIO PR | LT 230 kV S. OSORIO /U.S.OSORIO C-6 PR | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$6,319.80 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 230 kV S. OSORIO /U.S.OSORIO PR | LT 230 kV S. OSORIO /U.S.OSORIO C-6 PR | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$11,091.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 230 kV S. OSORIO /U.S.OSORIO PR | LT 230 kV S. OSORIO /U.S.OSORIO C-6 PR | DIT | 057/2001 | IPCA | RCDM | REA 4347/2013 | 5/6/2019 | 5/8/2049 | R$63,989.05 | 6/1/2025 | Ativa | Substituição de 9 transformadores de corrente (capacidade necessária de corrente de curto-circuito igual ou maior a 40 kA) dos vãos: TF7-230; UHSO 5; UHSO 6. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | LT 230 kV S. OSORIO /U.S.OSORIO PR | LT 230 kV S. OSORIO /U.S.OSORIO C-5 PR | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$6,319.80 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 230 kV S. OSORIO /U.S.OSORIO PR | LT 230 kV S. OSORIO /U.S.OSORIO C-5 PR | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$11,091.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 230 kV S. OSORIO /U.S.OSORIO PR | LT 230 kV S. OSORIO /U.S.OSORIO C-5 PR | DIT | 057/2001 | IPCA | RCDM | REA 4347/2013 | 5/6/2019 | 5/8/2049 | R$63,989.05 | 6/1/2025 | Ativa | Substituição de 9 transformadores de corrente (capacidade necessária de corrente de curto-circuito igual ou maior a 40 kA) dos vãos: TF7-230; UHSO 5; UHSO 6. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | LT 230 kV S. OSORIO /U.S.OSORIO PR | LT 230 kV S. OSORIO /U.S.OSORIO C-4 PR | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$6,157.76 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 230 kV S. OSORIO /U.S.OSORIO PR | LT 230 kV S. OSORIO /U.S.OSORIO C-4 PR | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$10,807.37 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 230 kV S. OSORIO /U.S.OSORIO PR | LT 230 kV S. OSORIO /U.S.OSORIO C-3 PR | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$6,157.76 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 230 kV S. OSORIO /U.S.OSORIO PR | LT 230 kV S. OSORIO /U.S.OSORIO C-3 PR | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$10,807.37 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 230 kV S. OSORIO /U.S.OSORIO PR | LT 230 kV S. OSORIO /U.S.OSORIO C-2 PR | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$5,995.71 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 230 kV S. OSORIO /U.S.OSORIO PR | LT 230 kV S. OSORIO /U.S.OSORIO C-1 PR | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$5,995.71 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 230 kV S. OSORIO /XANXERE ESU PR/SC | LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC | RB | FT LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,558,397.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV S.DA MESA /NIQUELANDIA GO | LT 230 kV S.DA MESA /NIQUELANDIA C-2 GO | RB | FT LT 230 kV S.DA MESA /NIQUELANDIA C-2 GO | 028/2009 | IPCA | RBL | CC 028/2009 | 9/27/2017 | 11/19/2039 | R$ 8,776,159.19 | 6/1/2025 | Ativa | T2009-241-A | Contrato de Concessão nº 028/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia | LT 230 kV S.DA MESA /NIQUELANDIA GO | LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO | RB | FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,829,172.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV S.DA MESA /NIQUELANDIA GO | LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO | RB | FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 7,019,223.52 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 230 kV S.DA MESA /NIQUELANDIA GO | LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO | RB | FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 7,524,983.37 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV S.JOAO PIAUI /ELISEU MARTIN PI | LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI | RB | FT LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,155,936.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV S.JOAO PIAUI /ELISEU MARTIN PI | LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI | RB | FT LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/24/2014 | 7/23/2039 | R$447,584.00 | 6/1/2025 | Ativa | RECONSTRUÇÃO DA ESTRADA DE ACESSO Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV S.JOAO PIAUI /ELISEU MARTIN PI | LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI | RB | FT LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 8,856,091.56 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV S.JOAO PIAUI /ELISEU MARTIN PI | LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI | RB | FT LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 8,164,234.38 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV S.JOAO PIAUI /ELISEU MARTIN PI | LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI | RB | FT LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/1/2022 | 12/5/2059 | R$51,054.21 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV S.JOAO PIAUI /PICOS PI | LT 230 kV S.JOAO PIAUI /PICOS C-1 PI | RB | FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,062,846.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV S.JOAO PIAUI /PICOS PI | LT 230 kV S.JOAO PIAUI /PICOS C-1 PI | RB | FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 8,594,865.03 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV S.JOAO PIAUI /PICOS PI | LT 230 kV S.JOAO PIAUI /PICOS C-1 PI | RB | FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/20/2022 | 11/24/2059 | R$176,304.17 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | LT 230 kV SAMUEL /ARIQUEMES RO | LT 230 kV SAMUEL /ARIQUEMES C-3 RO | RB | FT LT 230 kV SAMUEL /ARIQUEMES C-3 RO | 021/2009 | IPCA | RBL | CC 021/2009 | 10/28/2015 | 11/19/2039 | R$ 13,196,992.46 | 6/1/2025 | Ativa | T2009-245 | *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Norte | LT 230 kV SAMUEL /ARIQUEMES RO | LT 230 kV SAMUEL /ARIQUEMES C-1 RO | RB | FT LT 230 kV SAMUEL /ARIQUEMES C-1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,296,528.36 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV SAMUEL /PORTO VELHO RO | LT 230 kV SAMUEL /PORTO VELHO C-3 RO | RB | FT LT 230 kV SAMUEL /PORTO VELHO C-3 RO | 021/2009 | IPCA | RBL | CC 021/2009 | 10/28/2015 | 11/19/2039 | R$ 3,599,180.46 | 6/1/2025 | Ativa | T2009-245 | *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Norte | LT 230 kV SAMUEL /PORTO VELHO RO | LT 230 kV SAMUEL /PORTO VELHO C-2 RO | RB | FT LT 230 kV SAMUEL /PORTO VELHO C-2 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$704,019.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV SAMUEL /PORTO VELHO RO | LT 230 kV SAMUEL /PORTO VELHO C-1 RO | RB | FT LT 230 kV SAMUEL /PORTO VELHO C-1 RO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$704,019.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV SANTANA II /ANGELIM AL/PE | LT 230 kV SANTANA II /ANGELIM C-1 AL/PE | RB | FT LT 230 kV SANTANA II /ANGELIM C-1 AL/PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,468,895.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV SANTANA II /ANGELIM AL/PE | LT 230 kV SANTANA II /ANGELIM C-1 AL/PE | RB | FT LT 230 kV SANTANA II /ANGELIM C-1 AL/PE | 061/2001 | IPCA | RBNI | DSP 1019/2022 | 12/10/2021 | 12/31/2042 | R$177,858.77 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito simples, Santana II-Angelim C1, originado do seccionamento da Linha de Transmissão 230 kV Paulo Afonso III - Angelim C1, e a Subestação seccionadora Santana II, com 21,2 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV SANTANA II /ANGELIM AL/PE | LT 230 kV SANTANA II /ANGELIM C-1 AL/PE | RB | FT LT 230 kV SANTANA II /ANGELIM C-1 AL/PE | 061/2001 | IPCA | RBNIA | REA 5824/2016 | R$ - | 6/1/2025 | Prevista | T2015-074 | Aumento do limite de curta duração de 516 A para 621 A, pela eliminação de fator limitante ativo (restauração da altura mínima de segurança). | Empreendimento revogado pela ANEEL, conforme Despacho nº 3.110, de 17.10.2025 | |||
| AXIA Energia Nordeste | LT 230 kV SANTANA II /ANGELIM AL/PE | LT 230 kV SANTANA II /ANGELIM C-1 AL/PE | RB | FT LT 230 kV SANTANA II /ANGELIM C-1 AL/PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/24/2022 | 9/28/2059 | R$136,773.53 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | LT 230 kV SAO LUIS II /MIRANDA II MA | LT 230 kV SAO LUIS II /MIRANDA II C-1 MA | RB | FT LT 230 kV SAO LUIS II /MIRANDA II C-1 MA | 058/2001 | IPCA | RBNI | REA 3216/2011 | 5/26/2014 | 4/30/2049 | R$20,386.02 | 6/1/2025 | Ativa | T2011-118 | Remanejar trecho de 250m da LT 230kV Miranda II - São Luis II, em circuito simples, com 1 cabo por fase e 2 cabos pára-raios, na chegada da LT à SE São Luis II em virtude da instalação do 4º TR 500/230 kV - 3x200MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | LT 230 kV SAO LUIS II /MIRANDA II MA | LT 230 kV SAO LUIS II /MIRANDA II C-1 MA | RB | FT LT 230 kV SAO LUIS II /MIRANDA II C-1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,295,800.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV SAO LUIS II /SAO LUIS I MA | LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA | RB | FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$454,678.56 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV SAO LUIS II /SAO LUIS I MA | LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA | RB | FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$987,072.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV SAO LUIS II /SAO LUIS I MA | LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA | RB | FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$946,698.28 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV SAO LUIS II /SAO LUIS I MA | LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA | RB | FT LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$445,106.38 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV SAO LUIS II /SAO LUIS I MA | LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA | RB | FT LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$966,292.01 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV SAO LUIS II /SAO LUIS III MA | LT 230 kV SAO LUIS II /SAO LUIS III C-2 MA | RB | FT LT 230 kV SAO LUIS II /SAO LUIS III C-2 MA | 004/2010 | IPCA | RBL | CC 004/2010 | 7/12/2010 | 7/12/2040 | R$ 2,564,327.46 | 6/1/2025 | Ativa | T2010-058-A | Contrato de Concessão nº 004/2010 LT 230kV São Luis II / São Luis III C2 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Norte | LT 230 kV SAO LUIS II /SAO LUIS III MA | LT 230 kV SAO LUIS II /SAO LUIS III C-1 MA | RB | FT LT 230 kV SAO LUIS II /SAO LUIS III C-1 MA | 007/2008 | IPCA | RBL | CC 007/2008 | 3/17/2008 | 3/17/2038 | R$ 2,073,370.22 | 6/1/2025 | Ativa | T2000-190 | Contrato de Concessão nº 007/2008 *(Considera adicional de RGR relativo à prorrogação do encargo) * (Receita revisada em 18/06/2013)* Receita revisada no reajuste da RAP do ciclo 2018-2019. * Receita revisada em 07-11-2023 | ||
| AXIA Energia Nordeste | LT 230 kV SAPEACU /FUNIL BA | LT 230 kV SAPEACU /FUNIL C-1 BA | RB | FT LT 230 kV SAPEACU /FUNIL C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,572,104.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV SAPEACU /FUNIL BA | LT 230 kV SAPEACU /FUNIL C-1 BA | RB | FT LT 230 kV SAPEACU /FUNIL C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/15/2018 | 5/30/2047 | R$407,448.89 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV SAPEACU /STO.A.JESUS BA | LT 230 kV SAPEACU /STO.A.JESUS C-2 BA | RB | FT LT 230 kV SAPEACU /STO.A.JESUS C-2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$461,026.41 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV SAPEACU /STO.A.JESUS BA | LT 230 kV SAPEACU /STO.A.JESUS C-2 BA | RB | FT LT 230 kV SAPEACU /STO.A.JESUS C-2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,293,718.01 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV SAPEACU /STO.A.JESUS BA | LT 230 kV SAPEACU /STO.A.JESUS C-2 BA | RB | FT LT 230 kV SAPEACU /STO.A.JESUS C-2 BA | 061/2001 | IPCA | RBNIA | REA 15816/2025 | R$ 5,573,957.82 | 6/1/2025 | Prevista | T2025-002 | Recondutoramento do 2° circuito da LT 230 kV SAPEACU /STO.A.JESUS BA, com extensão de 33 km, em circuito duplo. | ||||
| AXIA Energia Nordeste | LT 230 kV SAPEACU /STO.A.JESUS BA | LT 230 kV SAPEACU /STO.A.JESUS C-1 BA | RB | FT LT 230 kV SAPEACU /STO.A.JESUS C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$461,026.41 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV SAPEACU /STO.A.JESUS BA | LT 230 kV SAPEACU /STO.A.JESUS C-1 BA | RB | FT LT 230 kV SAPEACU /STO.A.JESUS C-1 BA | 061/2001 | IPCA | RBNIA | REA 15816/2025 | R$ 5,573,957.82 | 6/1/2025 | Prevista | T2025-001 | Recondutoramento do 1° circuito da LT 230 kV SAPEACU /STO.A.JESUS BA, com extensão de 33 km, em circuito duplo. | ||||
| AXIA Energia Norte | LT 230 kV SINOP /SORRISO II MT | LT 230 kV SINOP /SORRISO II C-1 MT | RB | FT LT 230 kV SINOP /SORRISO II C-1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$9,254.07 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV SINOP /SORRISO II MT | LT 230 kV SINOP /SORRISO II C-1 MT | RB | FT LT 230 kV SINOP /SORRISO II C-1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$20,089.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV SINOP /SORRISO II MT | LT 230 kV SINOP /SORRISO II C-1 MT | RB | FT LT 230 kV SINOP /SORRISO II C-1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$19,268.14 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV SOBRAL II /SOBRAL III CE | LT 230 kV SOBRAL II /SOBRAL III C-2 CE | RB | FT LT 230 kV SOBRAL II /SOBRAL III C-2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$238,581.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV SOBRAL II /SOBRAL III CE | LT 230 kV SOBRAL II /SOBRAL III C-1 CE | RB | FT LT 230 kV SOBRAL II /SOBRAL III C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$238,581.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV SOBRAL III /ACARAU II CE | LT 230 kV SOBRAL III /ACARAU II C-1 CE | RB | FT LT 230 kV SOBRAL III /ACARAU II C-1 CE | 021/2010 | IPCA | RBL | CC 021/2010 | 4/8/2014 | 11/23/2040 | R$ 4,345,448.98 | 6/1/2025 | Ativa | T2010-092 | Contrato de Concessão nº 021/2010RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Norte | LT 230 kV SORRISO II /SORRISO MT | LT 230 kV SORRISO II /SORRISO C-1 MT | RB | FT LT 230 kV SORRISO II /SORRISO C-1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$9,128.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV SORRISO II /SORRISO MT | LT 230 kV SORRISO II /SORRISO C-1 MT | RB | FT LT 230 kV SORRISO II /SORRISO C-1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$19,818.08 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV SORRISO II /SORRISO MT | LT 230 kV SORRISO II /SORRISO C-1 MT | RB | FT LT 230 kV SORRISO II /SORRISO C-1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$19,007.46 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV SR.BONFIM II /CAMPO FORMOSO BA | LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA | RB | FT LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$961,284.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV SR.BONFIM II /CAMPO FORMOSO BA | LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA | RB | FT LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,697,527.40 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV SR.BONFIM II /CAMPO FORMOSO BA | LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA | RB | FT LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA | 061/2001 | IPCA | RBNI | DSP 1172/2022 | 11/25/2015 | 12/31/2042 | R$32,354.03 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Senhor do Bonfim II - Campo Formoso C1, originado do seccionamento da Linha de Transmissão 230 kV Senhor do Bonfim II – Irecê na subestação seccionadora Campo Formoso, com 4,4 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV SR.BONFIM II /CAMPO FORMOSO BA | LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA | RB | FT LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/1/2022 | 11/30/2047 | R$149,236.92 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV STO.A.JESUS /FUNIL BA | LT 230 kV STO.A.JESUS /FUNIL C-2 BA | RB | FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,796,413.33 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV STO.A.JESUS /FUNIL BA | LT 230 kV STO.A.JESUS /FUNIL C-2 BA | RB | FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 7,847,208.31 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV STO.A.JESUS /FUNIL BA | LT 230 kV STO.A.JESUS /FUNIL C-2 BA | RB | FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 7,234,167.29 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV STO.A.JESUS /FUNIL BA | LT 230 kV STO.A.JESUS /FUNIL C-1 BA | RB | FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,342,590.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV SUAPE II /SUAPE III PE | LT 230 kV SUAPE II /SUAPE III C-2 PE | RB | FT LT 230 kV SUAPE II /SUAPE III C-2 PE | 006/2009 | IPCA | RBL | CC 006/2009 | 1/28/2009 | 1/28/2039 | R$720,954.87 | 6/1/2025 | Ativa | T2009-199 | Contrato de Concessão nº 006/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Nordeste | LT 230 kV SUAPE II /SUAPE III PE | LT 230 kV SUAPE II /SUAPE III C-1 PE | RB | FT LT 230 kV SUAPE II /SUAPE III C-1 PE | 006/2009 | IPCA | RBL | CC 006/2009 | 1/28/2009 | 1/28/2039 | R$720,954.87 | 6/1/2025 | Ativa | T2009-199 | Contrato de Concessão nº 006/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Nordeste | LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II BA | LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA | RB | FT LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,769,406.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II BA | LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA | RB | FT LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,965,253.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II BA | LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA | RB | FT LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 4,577,357.08 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II BA | LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA | RB | FT LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA | 061/2001 | IPCA | RBNI | REA 10198/2021 | 6/5/2019 | 12/31/2042 | R$ 636.45 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de um trecho de LT em 230 kV entre o ponto de seccionamento da LT 230 kV Barreiras II – Bom Jesus da Lapa e a subestação seccionadora Tabocas do Brejo Velho, com 0,07 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II BA | LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA | RB | FT LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA | 061/2001 | IPCA | RBNI | REA 9680/2021 | 11/19/2019 | 12/31/2042 | R$28,294.83 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 230 kV, circuito simples, entre o ponto de seccionamento da Linha de Transmissão 230 kV Barreiras – Bom Jesus da Lapa na Subestação Barreiras II, com 3,2 Km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV TACAIMBO /C.GRANDE II PE/PB | LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB | RB | FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,276,144.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV TACAIMBO /C.GRANDE II PE/PB | LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB | RB | FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,387,244.75 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV TACAIMBO /C.GRANDE II PE/PB | LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,276,144.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV TACAIMBO /C.GRANDE II PE/PB | LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,387,244.75 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV TACAIMBO /C.GRANDE II PE/PB | LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB | RB | FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/21/2018 | 9/20/2051 | R$ 520.88 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV TACARATU /BOM NOME PE | LT 230 kV TACARATU /BOM NOME C-1 PE | RB | FT LT 230 kV TACARATU /BOM NOME C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,307,165.16 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV TACARATU /BOM NOME PE | LT 230 kV TACARATU /BOM NOME C-1 PE | RB | FT LT 230 kV TACARATU /BOM NOME C-1 PE | 061/2001 | IPCA | RBNI | REA 7026/2018 | 12/15/2014 | 12/31/2042 | R$44,880.22 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de um trecho de linha de transmissão em 230 kV entre o ponto de seccionamento da linha de transmissão 230 kV Paulo Afonso III - Bom Nome C1 e a subestação seccionadora Tacaratu, com 7 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV TACARATU /FLORESTA II PE | LT 230 kV TACARATU /FLORESTA II C-2 PE | RB | FT LT 230 kV TACARATU /FLORESTA II C-2 PE | 061/2001 | IPCA | RBNIA | DSP 2563/2023 | R$711,043.40 | 6/1/2025 | Prevista | T2023-131 | Instalar o circuito LT 230 kV TACARATU /FLORESTA II C-1 PE originado do seccionamento do circuito LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE na SE TACARATU | ||||
| AXIA Energia Nordeste | LT 230 kV TACARATU /FLORESTA II PE | LT 230 kV TACARATU /FLORESTA II C-1 PE | RB | FT LT 230 kV TACARATU /FLORESTA II C-1 PE | 061/2001 | IPCA | RBNIA | REA 14821/2023 | R$ 1,002,004.14 | 6/1/2025 | Prevista | T2023-130 | Instalar o circuito LT 230 kV TACARATU /FLORESTA II C-2 PE originado do seccionamento do circuito LT 230 kV P.AFONSO III /FLORESTA II C-2 AL/PE na SE TACARATU | ||||
| AXIA Energia Nordeste | LT 230 kV TERESINA /PIRIPIRI PI | LT 230 kV TERESINA /PIRIPIRI C-1 PI | RB | FT LT 230 kV TERESINA /PIRIPIRI C-1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,823,732.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV TERESINA /PIRIPIRI PI | LT 230 kV TERESINA /PIRIPIRI C-1 PI | RB | FT LT 230 kV TERESINA /PIRIPIRI C-1 PI | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/1/2022 | 12/5/2059 | R$33,241.87 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV TERESINA II /TERESINA III PI | LT 230 kV TERESINA II /TERESINA III C-2 PI | RB | FT LT 230 kV TERESINA II /TERESINA III C-2 PI | 017/2011 | IPCA | RBL | CC 017/2011 | 10/18/2017 | 12/9/2041 | R$ 1,739,341.04 | 6/1/2025 | Ativa | T2012-037 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | LT 230 kV TERESINA II /TERESINA III PI | LT 230 kV TERESINA II /TERESINA III C-1 PI | RB | FT LT 230 kV TERESINA II /TERESINA III C-1 PI | 017/2011 | IPCA | RBL | CC 017/2011 | 10/18/2017 | 12/9/2041 | R$ 1,739,341.04 | 6/1/2025 | Ativa | T2012-037 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | LT 230 kV TERESINA II /TERESINA PI | LT 230 kV TERESINA II /TERESINA C-2 PI | RB | FT LT 230 kV TERESINA II /TERESINA C-2 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$400,948.91 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV TERESINA II /TERESINA PI | LT 230 kV TERESINA II /TERESINA C-2 PI | RB | FT LT 230 kV TERESINA II /TERESINA C-2 PI | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,125,130.38 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV TERESINA II /TERESINA PI | LT 230 kV TERESINA II /TERESINA C-2 PI | RB | FT LT 230 kV TERESINA II /TERESINA C-2 PI | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,037,232.74 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV TERESINA II /TERESINA PI | LT 230 kV TERESINA II /TERESINA C-1 PI | RB | FT LT 230 kV TERESINA II /TERESINA C-1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$400,948.91 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV TERESINA II /TERESINA PI | LT 230 kV TERESINA II /TERESINA C-1 PI | RB | FT LT 230 kV TERESINA II /TERESINA C-1 PI | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,125,130.38 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV TERESINA II /TERESINA PI | LT 230 kV TERESINA II /TERESINA C-1 PI | RB | FT LT 230 kV TERESINA II /TERESINA C-1 PI | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,037,232.74 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV TOUROS /CEARA MIRIM II RN | LT 230 kV TOUROS /CEARA MIRIM II C-1 RN | RB | FT LT 230 kV TOUROS /CEARA MIRIM II C-1 RN | 018/2012 | IPCA | RBL | CC 018/2012 | 5/12/2017 | 6/1/2042 | R$ 3,717,472.50 | 6/1/2025 | Ativa | T2012-114-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | LT 230 kV TRANSAMAZONIC /RUROPOLIS PA | LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA | RB | FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,112,481.44 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV TRANSAMAZONIC /RUROPOLIS PA | LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA | RB | FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA | 058/2001 | IPCA | RBNI | REA 4660/2014 | 6/21/2016 | 1/22/2046 | R$7,384.29 | 6/1/2025 | Ativa | T2014-017 | Instalar o circuito LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA originado do seccionamento do circuito LT 230 kV ALTAMIRA /RUROPOLIS C-1 PA na SE TRANSAMAZONIC. Eliminação do atendimento em TAP. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | LT 230 kV TRANSAMAZONIC /RUROPOLIS PA | LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA | RB | FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,756,959.85 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV TRANSAMAZONIC /RUROPOLIS PA | LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA | RB | FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 6,480,580.06 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV TUCUMA /RIO BRANCO 1 AC | LT 230 kV TUCUMA /RIO BRANCO 1 C-1 AC | RB | FT LT 230 kV TUCUMA /RIO BRANCO 1 C-1 AC | 022/2009 | IPCA | RBL | CC 022/2009 | 10/27/2011 | 11/19/2039 | R$ 5,008,671.05 | 6/1/2025 | Ativa | Contrato de Concessão nº 022/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no Ciclo 2020-2021. * Receita revisada em 11-06-2025 | |||
| AXIA Energia Norte | LT 230 kV TUCUMA /RIO BRANCO 1 AC | LT 230 kV TUCUMA /RIO BRANCO 1 C-1 AC | RB | FT LT 230 kV TUCUMA /RIO BRANCO 1 C-1 AC | 022/2009 | IPCA | RBNI | DSP 516/2025 | 8/30/2024 | 11/19/2039 | R$631,828.48 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV Tucumã -Rio Branco 1 C1 circuito duplo, para seccionamento da Linha de Transmissão 230 kV Abunã -Rio Branco 1 C2 na Subestação seccionadora Tucumã, com 30 km de extensão. *(Receita revisada em 11/06/2025) | |||
| AXIA Energia Norte | LT 230 kV TUCURUI /ALTAMIRA PA | LT 230 kV TUCURUI /ALTAMIRA C-1 PA | RB | FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA | 058/2001 | IPCA | RBNI | REA 3216/2011 | 7/2/2015 | 7/5/2052 | R$66,335.20 | 6/1/2025 | Ativa | T2011-136 | Remanejamento de 0,525 km da LT 230 kV Tucuruí - Altamira, circuito simples, em razão do reforço autorizado pela REA 3216/2011. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | LT 230 kV TUCURUI /ALTAMIRA PA | LT 230 kV TUCURUI /ALTAMIRA C-1 PA | RB | FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 7,086,241.56 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV TUCURUI /ALTAMIRA PA | LT 230 kV TUCURUI /ALTAMIRA C-1 PA | RB | FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 15,383,690.02 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV TUCURUI /ALTAMIRA PA | LT 230 kV TUCURUI /ALTAMIRA C-1 PA | RB | FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 14,754,451.28 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV TUCURUI /ALTAMIRA PA | LT 230 kV TUCURUI /ALTAMIRA C-1 PA | RB | FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 8/29/2022 | 8/28/2037 | R$53,899.74 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV U. A. SALES /P.AFONSO III BA/AL | LT 230 kV U. A. SALES /P.AFONSO III C-2 BA/AL | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$124,850.24 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV U. A. SALES /P.AFONSO III BA/AL | LT 230 kV U. A. SALES /P.AFONSO III C-2 BA/AL | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$350,350.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV U. A. SALES /P.AFONSO III BA/AL | LT 230 kV U. A. SALES /P.AFONSO III C-1 BA/AL | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$127,040.60 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 230 kV U. A. SALES /P.AFONSO III BA/AL | LT 230 kV U. A. SALES /P.AFONSO III C-1 BA/AL | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$356,497.38 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 230 kV U.MASCARENHAS /LINHARES ES | LT 230 kV U.MASCARENHAS /LINHARES C-1 ES | RB | FT LT 230 kV U.MASCARENHAS /LINHARES C-1 ES | 006/2010 | IPCA | RBL | CC 006/2010 | 8/14/2018 | 7/12/2040 | R$ 5,580,067.78 | 6/1/2025 | Ativa | T2010-060 | Contrato de Concessão nº 006/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Nordeste | LT 230 kV U.SOBRADINHO /JUAZEIRO II BA | LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA | RB | FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA | 061/2001 | IPCA | RBNI | REA 2891/2011 | 9/11/2017 | 7/12/2054 | R$361,749.74 | 6/1/2025 | Ativa | T2009-090 | Recapacitar a LT 230 kV SOBRADINHO / JUAZEIRO DA BAHIA II C2, com a inclusão de torres metálicas e troca de cabo condutor e pararraios em alguns trechos do 42,5 km da linha. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV U.SOBRADINHO /JUAZEIRO II BA | LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA | RB | FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$612,300.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV U.SOBRADINHO /JUAZEIRO II BA | LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA | RB | FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,718,219.23 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV U.SOBRADINHO /JUAZEIRO II BA | LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA | RB | FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA | 061/2001 | IPCA | RBNI | REA 2891/2011 | 9/11/2017 | 7/12/2054 | R$361,749.74 | 6/1/2025 | Ativa | T2009-090 | Recapacitar a LT 230 kV SOBRADINHO / JUAZEIRO DA BAHIA II C1, com a inclusão de torres metálicas e troca de cabo condutor e pararraios em alguns trechos do 42,5 km da linha. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 230 kV U.SOBRADINHO /JUAZEIRO II BA | LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA | RB | FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$612,300.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV U.SOBRADINHO /JUAZEIRO II BA | LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA | RB | FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,718,219.23 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV U.SOBRADINHO /JUAZEIRO II BA | LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA | RB | FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/19/2021 | 11/18/2054 | R$37,362.47 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 230 kV UB.ESPERANCA /B. ESPERANCA PI | LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI | RB | FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$66,440.77 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 230 kV UB.ESPERANCA /B. ESPERANCA PI | LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI | RB | FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$186,444.03 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV UTINGA /CASTANHAL PA | LT 230 kV UTINGA /CASTANHAL C-1 PA | RB | FT LT 230 kV UTINGA /CASTANHAL C-1 PA | 058/2001 | IPCA | RBNI | REA 2152/2009 | 11/19/2012 | 8/25/2048 | R$120,602.69 | 6/1/2025 | Ativa | T2009-161 | Instalação do circuito LT 230 kV UTINGA /CASTANHAL C-1 PA originado do seccionamento do circuito LT 230 kV UTINGA /SANTA MARIA C-1 PA na SE CASTANHAL e acréscimo de 0,5 km de linha. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | LT 230 kV UTINGA /CASTANHAL PA | LT 230 kV UTINGA /CASTANHAL C-1 PA | RB | FT LT 230 kV UTINGA /CASTANHAL C-1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,352,500.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV UTINGA /CASTANHAL PA | LT 230 kV UTINGA /CASTANHAL C-1 PA | RB | FT LT 230 kV UTINGA /CASTANHAL C-1 PA | 058/2001 | IPCA | RBNI | REA 6029/2016 | 7/12/2019 | 7/15/2056 | R$842,488.27 | 6/1/2025 | Ativa | T2016-057 | Recapacitação da LT 230 kV Utinga - Castanhal, através de retensionamento de cabo, alterando capacidade de 586A para 866A *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | LT 230 kV UTINGA /CASTANHAL PA | LT 230 kV UTINGA /CASTANHAL C-1 PA | RB | FT LT 230 kV UTINGA /CASTANHAL C-1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,936,175.81 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV UTINGA /CASTANHAL PA | LT 230 kV UTINGA /CASTANHAL C-1 PA | RB | FT LT 230 kV UTINGA /CASTANHAL C-1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,816,077.48 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV UTINGA /MIRAMAR PA | LT 230 kV UTINGA /MIRAMAR C-2 PA | RB | FT LT 230 kV UTINGA /MIRAMAR C-2 PA | 058/2001 | IPCA | RBNI | REA 3362/2012 | 4/19/2016 | 7/10/2052 | R$21,979.28 | 6/1/2025 | Ativa | T2012-015 | Adequar o a LT 230 kV Utinga/Miramar para operar em sua tensão nominal com a troca de alguns isoladores por tipo poliméricos. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | LT 230 kV UTINGA /MIRAMAR PA | LT 230 kV UTINGA /MIRAMAR C-2 PA | RB | FT LT 230 kV UTINGA /MIRAMAR C-2 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$177,395.76 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV UTINGA /MIRAMAR PA | LT 230 kV UTINGA /MIRAMAR C-2 PA | RB | FT LT 230 kV UTINGA /MIRAMAR C-2 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$385,112.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV UTINGA /MIRAMAR PA | LT 230 kV UTINGA /MIRAMAR C-1 PA | RB | FT LT 230 kV UTINGA /MIRAMAR C-1 PA | 058/2001 | IPCA | RBNI | REA 3362/2012 | 4/19/2016 | 7/10/2052 | R$21,979.28 | 6/1/2025 | Ativa | T2012-015 | Adequar o a LT 230 kV Utinga/Miramar para operar em sua tensão nominal com a troca de alguns isoladores por tipo poliméricos. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | LT 230 kV UTINGA /MIRAMAR PA | LT 230 kV UTINGA /MIRAMAR C-1 PA | RB | FT LT 230 kV UTINGA /MIRAMAR C-1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$177,395.76 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV UTINGA /MIRAMAR PA | LT 230 kV UTINGA /MIRAMAR C-1 PA | RB | FT LT 230 kV UTINGA /MIRAMAR C-1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$385,112.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV VARZEA GRANDE 2 /COXIPO MT | LT 230 kV VARZEA GRANDE 2 /COXIPO C-2 MT | RB | FT LT 230 kV VARZEA GRANDE 2 /COXIPO C-2 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$515,136.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV VARZEA GRANDE 2 /COXIPO MT | LT 230 kV VARZEA GRANDE 2 /COXIPO C-2 MT | RB | FT LT 230 kV VARZEA GRANDE 2 /COXIPO C-2 MT | 058/2001 | IPCA | RBNI | REA 4967/2014 | 6/21/2016 | 2/26/2053 | R$313,260.74 | 6/1/2025 | Ativa | T2014-091 | Instalar o circuito LT 230 kV VARZEA GRANDE /COXIPO C-1 MT originado do seccionamento do circuito LT 230 kV JAURU /COXIPO C-1 MT na SE VARZEA GRANDE *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | LT 230 kV VARZEA GRANDE 2 /COXIPO MT | LT 230 kV VARZEA GRANDE 2 /COXIPO C-1 MT | RB | FT LT 230 kV VARZEA GRANDE 2 /COXIPO C-1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$394,613.07 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV VILA DO CONDE /GUAMA PA | LT 230 kV VILA DO CONDE /GUAMA C-2 PA | RB | FT LT 230 kV VILA DO CONDE /GUAMA C-2 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$841,904.11 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV VILA DO CONDE /GUAMA PA | LT 230 kV VILA DO CONDE /GUAMA C-2 PA | RB | FT LT 230 kV VILA DO CONDE /GUAMA C-2 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,827,709.61 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV VILA DO CONDE /GUAMA PA | LT 230 kV VILA DO CONDE /GUAMA C-2 PA | RB | FT LT 230 kV VILA DO CONDE /GUAMA C-2 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 7/12/2021 | 7/16/2058 | R$ 1,608,751.60 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | LT 230 kV VILA DO CONDE /GUAMA PA | LT 230 kV VILA DO CONDE /GUAMA C-1 PA | RB | FT LT 230 kV VILA DO CONDE /GUAMA C-1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$841,904.11 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 230 kV VILA DO CONDE /GUAMA PA | LT 230 kV VILA DO CONDE /GUAMA C-1 PA | RB | FT LT 230 kV VILA DO CONDE /GUAMA C-1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,827,709.61 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV VILA MARIA /NOVA PRATA 2 RS | LT 230 kV VILA MARIA /NOVA PRATA 2 C-2 RS | RB | FT LT 230 kV VILA MARIA /NOVA PRATA 2 C-2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,388,927.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV VILA MARIA /NOVA PRATA 2 RS | LT 230 kV VILA MARIA /NOVA PRATA 2 C-2 RS | RB | FT LT 230 kV VILA MARIA /NOVA PRATA 2 C-2 RS | 057/2001 | IPCA | RBNI | REA 3161/2011 | 9/25/2015 | 6/3/2051 | R$562,338.37 | 6/1/2025 | Ativa | T2019-048-C | Receita resultante do seccionamento do circuito LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS na SE VILA MARIA . Trecho de linha de transmissão em 230 kV, circuito duplo, cabo 636 MCM Grosbeak, totalizando 9 km, refrente à extensão do circuito LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS do ponto de seccionamento do circuito LT 230 kV MONTE CLARO /PASSO FUNDO C-1 RS até a SE NOVA PRATA 2. (Apenas metade da receita. A outra metade consta no módulo LT 230 kV Monte Claro /Nova Prata 2 C-2 RS) *(Inclui alterações estabelecidas pela Lei 12.783/2013)*(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | LT 230 kV VILA MARIA /NOVA PRATA 2 RS | LT 230 kV VILA MARIA /NOVA PRATA 2 C-2 RS | RB | FT LT 230 kV VILA MARIA /NOVA PRATA 2 C-2 RS | 057/2001 | IPCA | RBNI | REA 8795/2020 | 12/5/2022 | 12/5/2050 | R$ 3,280,548.51 | 6/1/2025 | Ativa | T2020-025 | Recapacitação da LT 230 kV Nova Prata 2 - Vila Maria C2 (62,2 km), para novas capacidades de 232 MVA em regime de longa duração e 292 MVA em regime de curta duração | ||
| AXIA Energia Sul | LT 230 kV VILA MARIA /NOVA PRATA 2 RS | LT 230 kV VILA MARIA /NOVA PRATA 2 C-2 RS | RB | FT LT 230 kV VILA MARIA /NOVA PRATA 2 C-2 RS | 057/2001 | IPCA | RBNI | DSP 1128/2024 | 8/24/2023 | 8/23/2057 | R$2,793.69 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Nova Prata 2 - Vila Maria C2, originado do seccionamento da Linha de Transmissão 230 kV Passo Fundo - Nova Prata 2 C2, e a Subestação seccionadora Vila Maria, com 0,185 km de extensão. | |||
| AXIA Energia Sul | LT 230 kV VILA MARIA /NOVA PRATA 2 RS | LT 230 kV VILA MARIA /NOVA PRATA 2 C-1 RS | RB | FT LT 230 kV VILA MARIA /NOVA PRATA 2 C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,414,935.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV VILA MARIA /NOVA PRATA 2 RS | LT 230 kV VILA MARIA /NOVA PRATA 2 C-1 RS | RB | FT LT 230 kV VILA MARIA /NOVA PRATA 2 C-1 RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,483,328.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV VILA MARIA /NOVA PRATA 2 RS | LT 230 kV VILA MARIA /NOVA PRATA 2 C-1 RS | RB | FT LT 230 kV VILA MARIA /NOVA PRATA 2 C-1 RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,103,422.62 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 230 kV VILA MARIA /NOVA PRATA 2 RS | LT 230 kV VILA MARIA /NOVA PRATA 2 C-1 RS | RB | FT LT 230 kV VILA MARIA /NOVA PRATA 2 C-1 RS | 057/2001 | IPCA | RBNI | REA 8795/2020 | 11/18/2022 | 7/6/2059 | R$ 5,540,483.12 | 6/1/2025 | Ativa | T2020-025 | Recapacitação da LT 230 kV Nova Prata 2 - Vila Maria C1 (64,2 km), para novas capacidades de 232 MVA em regime de longa duração e 292 MVA em regime de curta duração *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | LT 230 kV VILA MARIA /NOVA PRATA 2 RS | LT 230 kV VILA MARIA /NOVA PRATA 2 C-1 RS | RB | FT LT 230 kV VILA MARIA /NOVA PRATA 2 C-1 RS | 057/2001 | IPCA | RBNI | DSP 1128/2024 | 8/24/2023 | 8/23/2057 | R$2,567.17 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Nova Prata 2 - Vila Maria C1, originado do seccionamento da Linha de Transmissão 230 kV Passo Fundo - Nova Prata 2 C1, e a Subestação seccionadora Vila Maria, com 0,17 km de extensão. | |||
| AXIA Energia Norte | LT 230 kV VILHENA /JAURU RO/MT | LT 230 kV VILHENA /JAURU C-3 RO/MT | RB | FT LT 230 kV VILHENA /JAURU C-3 RO/MT | 021/2009 | IPCA | RBL | CC 021/2009 | 10/28/2015 | 11/19/2039 | R$ 28,859,563.60 | 6/1/2025 | Ativa | T2009-245 | *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Sul | LT 230 kV VINHEDOS /GARIBALDI 1 RS | LT 230 kV VINHEDOS /GARIBALDI 1 C-1 RS | RB | FT LT 230 kV VINHEDOS /GARIBALDI 1 C-1 RS | 012/2010 | IPCA | RBL | CC 012/2010 | 7/19/2013 | 10/6/2040 | R$ 1,856,282.64 | 6/1/2025 | Ativa | T2010-079 | Contrato de Concessão nº 012/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Sul | LT 230 kV VINHEDOS /GARIBALDI 1 RS | LT 230 kV VINHEDOS /GARIBALDI 1 C-1 RS | RB | FT LT 230 kV VINHEDOS /GARIBALDI 1 C-1 RS | 012/2010 | IPCA | RBNI | DSP 1247/2022 | 11/12/2021 | 10/5/2040 | R$35,688.32 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 230 kV, circuito duplo, Vinhedos-Garibaldi C1, originado do seccionamento da Linha de Transmissão 230 kV Monte Claro - Garibaldi C1, e a Subestação seccionadora Vinhedos, com 2 km de extensão. | |||
| AXIA Energia Norte | LT 230 kV XINGU /RL (TUCURUI /ALTAMIRA) PA | LT 230 kV XINGU /RL (TUCURUI /ALTAMIRA) C-1 PA | RB | FT LT 230 kV XINGU /RL (TUCURUI /ALTAMIRA) C-1 PA | 058/2001 | IPCA | RBNI | REA 4472/2014 | 10/1/2014 | 12/31/2042 | R$16,645.74 | 6/1/2025 | Ativa | T2013-102 | Parcela adicional de RAP para operação e manutenção de LT 230 kV XINGU /Ramal Xingu - LT 230 kV Altamira / Tucurui C-1 PA: Construção de trecho de linha em derivação, com extensão de quinhentos metros, entre a SE Xingu e a Linha de Transmissão 230 kV Tucuruí – Altamira. (Parcela de RAP referente à Operação e Manutenção) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| Nova Era Integração | LT 230 kV ZEBU II /ZEBU III AL | LT 230 kV ZEBU II /ZEBU III C-2 AL | RB | FT LT 230 kV ZEBU II /ZEBU III C-2 AL | 008/2024 | IPCA | RBL | CC 008/2024 | R$824,774.65 | 6/1/2025 | Prevista | T2024-197-A | LT 230 kV Zebu II - Zebu III - C1LT 230 kV Zebu II - Zebu III - C2 | ||||
| Nova Era Integração | LT 230 kV ZEBU II /ZEBU III AL | LT 230 kV ZEBU II /ZEBU III C-1 AL | RB | FT LT 230 kV ZEBU II /ZEBU III C-1 AL | 008/2024 | IPCA | RBL | CC 008/2024 | R$824,774.65 | 6/1/2025 | Prevista | T2024-197-A | LT 230 kV Zebu II - Zebu III - C1LT 230 kV Zebu II - Zebu III - C2 | ||||
| Nova Era Integração | LT 230 kV ZEBU III /FLORESTA II AL/PE | LT 230 kV ZEBU III /FLORESTA II C-1 AL/PE | RB | FT LT 230 kV ZEBU III /FLORESTA II C-1 AL/PE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 9,329,760.68 | 6/1/2025 | Prevista | T2024-197-A | LT 230 kV Zebu III - Floresta II - C1 | ||||
| AXIA Energia Nordeste | LT 230 kV ZEBU III /TACARATU AL/PE | LT 230 kV ZEBU III /TACARATU C-2 AL/PE | RB | FT LT 230 kV ZEBU III /TACARATU C-2 AL/PE | 061/2001 | IPCA | RBNIA | DSP 3614/2024 | R$274,298.03 | 6/1/2025 | Prevista | T2024-238 | Instalar o circuito LT 230 kV ZEBU III /TACARATU C-3 AL/PE originado do seccionamento do circuito LT 230 kV P.AFONSO III /TACARATU C-3 AL/PE na SE ZEBU III | ||||
| AXIA Energia Nordeste | LT 230 kV ZEBU III /TACARATU AL/PE | LT 230 kV ZEBU III /TACARATU C-1 AL/PE | RB | FT LT 230 kV ZEBU III /TACARATU C-1 AL/PE | 061/2001 | IPCA | RBNIA | DSP 3614/2024 | R$274,298.03 | 6/1/2025 | Prevista | T2024-237 | Instalar o circuito LT 230 kV ZEBU III /TACARATU C-2 AL/PE originado do seccionamento do circuito LT 230 kV P.AFONSO III /TACARATU C-2 AL/PE na SE ZEBU III | ||||
| AXIA Energia | LT 25 kV F.IGUACU 50HZ /ELETRODO PR PR | LT 25 kV F.IGUACU 50HZ /ELETRODO PR C-2 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$93,965.16 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 25 kV F.IGUACU 50HZ /ELETRODO PR PR | LT 25 kV F.IGUACU 50HZ /ELETRODO PR C-1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$93,965.16 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 25 kV IBIUNA /ELETRODO SP SP | LT 25 kV IBIUNA /ELETRODO SP C-2 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$93,965.16 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 25 kV IBIUNA /ELETRODO SP SP | LT 25 kV IBIUNA /ELETRODO SP C-1 SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$93,965.16 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 345 kV ADRIANOPOLIS /COMPERJ RJ | LT 345 kV ADRIANOPOLIS /COMPERJ C-1 RJ | RB | FT LT 345 kV ADRIANOPOLIS /COMPERJ C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,581,004.25 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV ADRIANOPOLIS /COMPERJ RJ | LT 345 kV ADRIANOPOLIS /COMPERJ C-1 RJ | RB | FT LT 345 kV ADRIANOPOLIS /COMPERJ C-1 RJ | 062/2001 | IPCA | RBNI | DSP 1154/2024 | 1/13/2024 | 1/12/2059 | R$353,922.73 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 345 kV, circuito simples, Adrianópolis -Comperj C1, originado do seccionamento da Linha de Transmissão 345 kV Adrianópolis - Macaé Merchan C2 na Subestação seccionadora Comperj, com 11 km de extensão. | |||
| AXIA Energia | LT 345 kV ADRIANOPOLIS /ITUTINGA RJ/MG | LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 5,854,170.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV ADRIANOPOLIS /ITUTINGA RJ/MG | LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | RB | FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 5,854,170.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV ADRIANOPOLIS /JACAREPAGUA RJ | LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ | RB | FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,117,881.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV ADRIANOPOLIS /NOVA IGUACU RJ | LT 345 kV ADRIANOPOLIS /NOVA IGUACU C-1 RJ | RB | FT LT 345 kV ADRIANOPOLIS /NOVA IGUACU C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$382,433.25 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV ADRIANOPOLIS /NOVA IGUACU RJ | LT 345 kV ADRIANOPOLIS /NOVA IGUACU C-1 RJ | RB | FT LT 345 kV ADRIANOPOLIS /NOVA IGUACU C-1 RJ | 062/2001 | IPCA | RBNI | DSP 836/2024 | 4/28/2023 | 4/27/2058 | R$278,845.13 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 345 kV, circuito duplo, Adrianópolis -Nova Iguaçu C1, originado do seccionamento da Linha de Transmissão 345 kV Adrianópolis - Jacarepaguá C1 na Subestação seccionadora Nova Iguaçu, com 11,8 km de extensão. | |||
| AXIA Energia | LT 345 kV ADRIANOPOLIS /VENDA PEDRAS RJ | LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ | RB | FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,147,719.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV ADRIANOPOLIS /VENDA PEDRAS RJ | LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ | RB | FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ | 062/2001 | IPCA | RBNI | REA 5538/2015 | 3/6/2014 | 12/31/2042 | R$ 2,652,488.68 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 26 km da LT 345 kV Adrianópolis / Macaé Merchant, proveniente do seccionamento, transferida de Pedras para Furnas, estabelecida pela REA 5.538/2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | LT 345 kV ADRIANOPOLIS /VENDA PEDRAS RJ | LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ | RB | FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 12,078,988.18 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV ATIBAIA 2 /MOGI CRUZES SP | LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP | RB | FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,000,630.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV ATIBAIA 2 /MOGI CRUZES SP | LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP | RB | FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RBNI | REA 3698/2012 | 9/18/2013 | 8/10/2046 | R$137,608.62 | 6/1/2025 | Ativa | T2013-060 | Substituição de 12,2 km dos cabos para-raios da linha de transmissão em 345 kV Mogi das Cruzes - Atibaia 2, circuito simples, trecho entre a subestação Mogi das Cruzes e a torre T469, por 2 cabos CAA - Dotterel 141,89 mm². *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | LT 345 kV ATIBAIA 2 /MOGI CRUZES SP | LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP | RB | FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RBNI | REA 4420/2013 | 9/10/2013 | 12/31/2042 | R$210,136.05 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 345 kV, circuito simples, de 1.8 km, entre o ponto de seccionamento da linha de transmissão 345 kV Poços de Caldas / Mogi das Cruzes e a subestação seccionadora Atibaia II. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | LT 345 kV ATIBAIA 2 /POCOS CALDAS SP/MG | LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG | RB | FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,000,630.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV ATIBAIA 2 /POCOS CALDAS SP/MG | LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG | RB | FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RBNI | REA 4420/2013 | 9/10/2013 | 12/31/2042 | R$210,136.05 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 345 kV, circuito simples, de 1.8 km, entre o ponto de seccionamento da linha de transmissão 345 kV Poços de Caldas / Mogi das Cruzes e a subestação seccionadora Atibaia II. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | LT 345 kV BANDEIRANTES /PIRINEUS GO | LT 345 kV BANDEIRANTES /PIRINEUS C-1 GO | RB | FT LT 345 kV BANDEIRANTES /PIRINEUS C-1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,823,912.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV BANDEIRANTES /PIRINEUS GO | LT 345 kV BANDEIRANTES /PIRINEUS C-1 GO | RB | FT LT 345 kV BANDEIRANTES /PIRINEUS C-1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,999,039.88 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV BANDEIRANTES /PIRINEUS GO | LT 345 kV BANDEIRANTES /PIRINEUS C-1 GO | RB | FT LT 345 kV BANDEIRANTES /PIRINEUS C-1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 7,503,345.43 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV BANDEIRANTES /PIRINEUS GO | LT 345 kV BANDEIRANTES /PIRINEUS C-1 GO | RB | FT LT 345 kV BANDEIRANTES /PIRINEUS C-1 GO | 062/2001 | IPCA | RBNI | DSP 854/2024 | 8/24/2023 | 8/23/2057 | R$32,719.96 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 345 kV, circuito duplo, Bandeirantes -Pirineus C1, originado do seccionamento da Linha de Transmissão 345 kV Bandeirantes - Samambaia C2 na Subestação seccionadora Pirineus, com 1,4 km de extensão. | |||
| AXIA Energia | LT 345 kV BANDEIRANTES /SAMAMBAIA GO/DF | LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF | RB | FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 4,618,616.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV BANDEIRANTES /SAMAMBAIA GO/DF | LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF | RB | FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 17,723,375.18 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV BANDEIRANTES /SAMAMBAIA GO/DF | LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF | RB | FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 19,000,406.97 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV BARREIRO 1 /SARZEDO MG | LT 345 kV BARREIRO 1 /SARZEDO C-1 MG | RB | FT LT 345 kV BARREIRO 1 /SARZEDO C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$588,358.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV BARREIRO 1 /SARZEDO MG | LT 345 kV BARREIRO 1 /SARZEDO C-1 MG | RB | FT LT 345 kV BARREIRO 1 /SARZEDO C-1 MG | 062/2001 | IPCA | RBNI | DSP 777/2024 | 9/6/2023 | 9/5/2057 | R$32,630.19 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 345 kV, circuito duplo, Barreiro 1 -Sarzedo C1, originado do seccionamento da Linha de Transmissão 345 kV Barreiro 1 - Pimenta C1 na Subestação seccionadora Sarzedo, com 1,38 km de extensão. | |||
| AXIA Energia | LT 345 kV BARRO BRANCO /OURO PRETO 2 MG | LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG | RB | FT LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,341,487.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV BARRO BRANCO /OURO PRETO 2 MG | LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG | RB | FT LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG | 062/2001 | IPCA | RBNI | REA 8920/2020 | 9/1/2017 | 12/31/2042 | R$10,581.11 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de um trecho de LT em 345 kV entre o ponto de seccionamento da LT 345 kV Outro Preto - Padre Fialho e a subestação seccionadora Barro Branco, com 0,6 km de extensão. *(Receita revisada em 03/07/2024) | |||
| VSB | LT 345 kV BRAS. SUL /SAMAMBAIA DF | LT 345 kV BRAS. SUL /SAMAMBAIA C-3 DF | RB | FT LT 345 kV BRAS. SUL /SAMAMBAIA C-3 DF | 014/2013 | IPCA | RBL | CC 014/2013 | 5/6/2016 | 10/9/2043 | R$849,590.42 | 6/1/2025 | Ativa | T2014-015-D | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia | LT 345 kV BRAS. SUL /SAMAMBAIA DF | LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF | RB | FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$529,522.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV BRAS. SUL /SAMAMBAIA DF | LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF | RB | FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,031,979.32 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV BRAS. SUL /SAMAMBAIA DF | LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF | RB | FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,178,390.61 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV BRAS. SUL /SAMAMBAIA DF | LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF | RB | FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$441,269.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV BRAS. SUL /SAMAMBAIA DF | LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF | RB | FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,693,316.10 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV BRAS. SUL /SAMAMBAIA DF | LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF | RB | FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,815,325.51 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV CAMPINAS /GUARULHOS SP | LT 345 kV CAMPINAS /GUARULHOS C-1 SP | RB | FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,588,778.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV CAMPINAS /POCOS CALDAS SP/MG | LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG | RB | FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,706,660.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV CAMPOS /MACAE MERCHAN RJ | LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ | RB | FT LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ | 006/2005 | IGPM | RBL | CC 006/2005 | 6/2/2010 | 3/4/2035 | R$ 13,759,200.03 | 6/1/2025 | Ativa | T2000-015 | Contrato de Concessão nº 006/2005 *(Considera adicional de RGR relativo à prorrogação do encargo) | ||
| AXIA Energia | LT 345 kV CAMPOS /MACAE MERCHAN RJ | LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ | RB | FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,618,196.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV CAMPOS /MACAE MERCHAN RJ | LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ | RB | FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 10,047,008.86 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV CAMPOS /MACAE MERCHAN RJ | LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ | RB | FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 10,770,931.34 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV CAMPOS /MACAE MERCHAN RJ | LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ | RB | FT LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,618,196.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV CAMPOS /MACAE MERCHAN RJ | LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ | RB | FT LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 10,047,008.86 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV CAMPOS /RIO NOVO DO SUL RJ/ES | LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES | RB | FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,500,735.09 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV CAMPOS /RIO NOVO DO SUL RJ/ES | LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES | RB | FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 13,433,641.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV CAMPOS /RIO NOVO DO SUL RJ/ES | LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES | RB | FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES | 062/2001 | IPCA | RBNI | DSP 1405/2022 | 9/1/2020 | 12/31/2042 | R$52,670.32 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho com 2 km de extensão da Linha de Transmissão 345 kV Rio Novo do Sul - Campos C2, circuito simples, derivada do seccionamento da Linha de Transmissão 345 kV Campos - Viana na SE Rio Novo do Sul. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | LT 345 kV CAMPOS /RIO NOVO DO SUL RJ/ES | LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES | RB | FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,500,735.09 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV CAMPOS /RIO NOVO DO SUL RJ/ES | LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES | RB | FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 13,433,641.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV CAMPOS /RIO NOVO DO SUL RJ/ES | LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES | RB | FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES | 062/2001 | IPCA | RBNI | DSP 1405/2022 | 9/1/2020 | 12/31/2042 | R$52,670.32 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho com 2 km de extensão da Linha de Transmissão 345 kV Rio Novo do Sul - Campos C1, circuito simples, derivada do seccionamento da Linha de Transmissão 345 kV Campos - Vitória na SE Rio Novo do Sul. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | LT 345 kV COMPERJ /LAGOS RJ | LT 345 kV COMPERJ /LAGOS C-1 RJ | RB | FT LT 345 kV COMPERJ /LAGOS C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,272,956.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV COMPERJ /LAGOS RJ | LT 345 kV COMPERJ /LAGOS C-1 RJ | RB | FT LT 345 kV COMPERJ /LAGOS C-1 RJ | 062/2001 | IPCA | RBNI | DSP 978/2024 | 11/1/2023 | 10/31/2057 | R$58,171.22 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 345 kV, circuito duplo, Comperj -Lagos C1, originado do seccionamento da Linha de Transmissão 345 kV Comperj - Macaé Merchan C1 na Subestação seccionadora Lagos, com 2,54 km de extensão. | |||
| AXIA Energia | LT 345 kV COMPERJ /LAGOS RJ | LT 345 kV COMPERJ /LAGOS C-1 RJ | RB | FT LT 345 kV COMPERJ /LAGOS C-1 RJ | 062/2001 | IPCA | RBNI | DSP 1154/2024 | 1/13/2024 | 1/12/2059 | R$353,922.73 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 345 kV, circuito simples, Comperj-Macaé Merchan C1, originado do seccionamento da Linha de Transmissão 345 kV Adrianópolis - Macaé Merchan C2 na Subestação seccionadora Comperj, com 11 km de extensão. | |||
| AXIA Energia | LT 345 kV CORUMBA /BRAS. SUL GO/DF | LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | RB | FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 7,472,157.25 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV CORUMBA /BRAS. SUL GO/DF | LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | RB | FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 28,673,485.97 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV CORUMBA /BRAS. SUL GO/DF | LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | RB | FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 30,739,511.91 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV CORUMBA /ITUMBIARA GO/MG | LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG | RB | FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,324,017.41 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV CORUMBA /ITUMBIARA GO/MG | LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG | RB | FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 8,918,131.46 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV CORUMBA /ITUMBIARA GO/MG | LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG | RB | FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 9,560,714.33 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV ESTREITO /FURNAS MG | LT 345 kV ESTREITO /FURNAS C-1 MG | RB | FT LT 345 kV ESTREITO /FURNAS C-1 MG | 062/2001 | IPCA | RBNI | REA 2176/2009 | 12/7/2012 | 1/29/2041 | R$28,946.77 | 6/1/2025 | Ativa | T2009-137 | LT 345 kV Furnas – Estreito - troca de trechos de cabo pararraio. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | LT 345 kV ESTREITO /FURNAS MG | LT 345 kV ESTREITO /FURNAS C-1 MG | RB | FT LT 345 kV ESTREITO /FURNAS C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,294,809.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV ESTREITO /L.C.BARRETO MG/SP | LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP | RB | FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$776,633.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV ESTREITO /L.C.BARRETO MG/SP | LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP | RB | FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,980,236.34 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV ESTREITO /L.C.BARRETO MG/SP | LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP | RB | FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 3,194,972.89 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV ESTREITO /L.C.BARRETO MG/SP | LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP | RB | FT LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP | 062/2001 | IPCA | RBNI | REA 2176/2009 | 12/7/2012 | 1/29/2041 | R$114,653.35 | 6/1/2025 | Ativa | T2009-137 | No 1º cabo pararraio serão substituídos os trechos de 2,5 km entre a Estreito e a torre 57, 3,0 km da torre 63 a 70 e 4,0 km entre a SE Mascarenhas de Moraes e a torre 76 por cabo CAA Dotterel 176,9 kCM. Será substituído também o trecho 2,45 km entre a as torres 57 e 73 por cabo OPGW 120mm2 FJ. No 2º cabo pararraio será substituído o trecho de 2,5 km entre a SE Estreito e a torre 56A por cabo CAA Dotterel 176,9 kCM. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | LT 345 kV ESTREITO /L.C.BARRETO MG/SP | LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP | RB | FT LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$776,633.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV ESTREITO /M. MORAES MG | LT 345 kV ESTREITO /M. MORAES C-1 MG | RB | FT LT 345 kV ESTREITO /M. MORAES C-1 MG | 062/2001 | IPCA | RBNI | REA 2176/2009 | 12/7/2012 | 1/29/2041 | R$26,016.14 | 6/1/2025 | Ativa | T2009-137 | LT 345 kV Mascarenhas de Moraes – Estreito - troca de trechos de cabo pararraio. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | LT 345 kV ESTREITO /M. MORAES MG | LT 345 kV ESTREITO /M. MORAES C-1 MG | RB | FT LT 345 kV ESTREITO /M. MORAES C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$458,919.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV FURNAS /ITUTINGA MG | LT 345 kV FURNAS /ITUTINGA C-1 MG | RB | FT LT 345 kV FURNAS /ITUTINGA C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 5,824,752.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV FURNAS /ITUTINGA MG | LT 345 kV FURNAS /ITUTINGA C-1 MG | RB | FT LT 345 kV FURNAS /ITUTINGA C-1 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 9/22/2019 | 9/25/2056 | R$222,104.00 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | LT 345 kV FURNAS /M. MORAES MG | LT 345 kV FURNAS /M. MORAES C-1 MG | RB | FT LT 345 kV FURNAS /M. MORAES C-1 MG | 062/2001 | IPCA | RBNI | REA 2176/2009 | 12/7/2012 | 1/29/2041 | R$32,068.33 | 6/1/2025 | Ativa | T2009-137 | LT Furnas - Mascarenhas de Moraes - substituição parcial de cabo pararraio. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | LT 345 kV FURNAS /M. MORAES MG | LT 345 kV FURNAS /M. MORAES C-1 MG | RB | FT LT 345 kV FURNAS /M. MORAES C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,059,465.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV FURNAS /PIMENTA MG | LT 345 kV FURNAS /PIMENTA C-1 MG | RB | FT LT 345 kV FURNAS /PIMENTA C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,941,584.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV FURNAS /POCOS CALDAS MG | LT 345 kV FURNAS /POCOS CALDAS C-2 MG | RB | FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,853,750.39 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV FURNAS /POCOS CALDAS MG | LT 345 kV FURNAS /POCOS CALDAS C-1 MG | RB | FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,853,750.39 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV FURNAS /VARGINHA 4 MG | LT 345 kV FURNAS /VARGINHA 4 C-1 MG | RB | FT LT 345 kV FURNAS /VARGINHA 4 C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,252,316.92 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV FURNAS /VARGINHA 4 MG | LT 345 kV FURNAS /VARGINHA 4 C-1 MG | RB | FT LT 345 kV FURNAS /VARGINHA 4 C-1 MG | 062/2001 | IPCA | RBNI | DSP 488/2025 | 12/20/2024 | 12/19/2059 | R$911,318.56 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 345 kV, circuito simples, Furnas - Varginha 4 C1, originado do seccionamento da Linha de Transmissão 345 kV Furnas - Itutinga C2 na Subestação seccionadora Varginha 4, com 34,6 km de extensão. | |||
| AXIA Energia | LT 345 kV GUARULHOS /IBIUNA SP | LT 345 kV GUARULHOS /IBIUNA C-2 SP | RB | FT LT 345 kV GUARULHOS /IBIUNA C-2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,869,589.90 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV GUARULHOS /IBIUNA SP | LT 345 kV GUARULHOS /IBIUNA C-2 SP | RB | FT LT 345 kV GUARULHOS /IBIUNA C-2 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 7,174,321.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV GUARULHOS /IBIUNA SP | LT 345 kV GUARULHOS /IBIUNA C-2 SP | RB | FT LT 345 kV GUARULHOS /IBIUNA C-2 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 7,691,256.88 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV GUARULHOS /IBIUNA SP | LT 345 kV GUARULHOS /IBIUNA C-2 SP | RB | FT LT 345 kV GUARULHOS /IBIUNA C-2 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 9/22/2019 | 9/25/2056 | R$12,315.28 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | LT 345 kV GUARULHOS /IBIUNA SP | LT 345 kV GUARULHOS /IBIUNA C-1 SP | RB | FT LT 345 kV GUARULHOS /IBIUNA C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,869,589.90 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV GUARULHOS /IBIUNA SP | LT 345 kV GUARULHOS /IBIUNA C-1 SP | RB | FT LT 345 kV GUARULHOS /IBIUNA C-1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 7,174,321.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV GUARULHOS /IBIUNA SP | LT 345 kV GUARULHOS /IBIUNA C-1 SP | RB | FT LT 345 kV GUARULHOS /IBIUNA C-1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 7,691,256.88 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV GUARULHOS /NORDESTE SP | LT 345 kV GUARULHOS /NORDESTE C-1 SP | RB | FT LT 345 kV GUARULHOS /NORDESTE C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$970,792.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV GUARULHOS /POCOS CALDAS SP/MG | LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG | RB | FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 5,412,901.32 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV GUARULHOS /POCOS CALDAS SP/MG | LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG | RB | FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 5,354,065.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV IBIUNA /SUL SP | LT 345 kV IBIUNA /SUL C-1 SP | RB | FT LT 345 kV IBIUNA /SUL C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,784,835.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV IBIUNA /SUL SP | LT 345 kV IBIUNA /SUL C-1 SP | RB | FT LT 345 kV IBIUNA /SUL C-1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,849,085.75 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV IBIUNA /TIJUCO PRETO SP | LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP | RB | FT LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,418,002.93 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV IBIUNA /TIJUCO PRETO SP | LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP | RB | FT LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 9,278,789.35 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV ITAPETI /NORDESTE SP | LT 345 kV ITAPETI /NORDESTE C-1 SP | RB | FT LT 345 kV ITAPETI /NORDESTE C-1 SP | 007/2006 | IPCA | RBL | CC 007/2006 | 4/27/2006 | 4/27/2036 | R$ 6,486,068.03 | 6/1/2025 | Ativa | T2000-067 | Contrato de Concessão nº 007/2006 *(Considera adicional de RGR relativo à prorrogação do encargo) | ||
| AXIA Energia | LT 345 kV ITAPETI /TIJUCO PRETO SP | LT 345 kV ITAPETI /TIJUCO PRETO C-4 SP | RB | FT LT 345 kV ITAPETI /TIJUCO PRETO C-4 SP | 007/2006 | IPCA | RBL | CC 007/2006 | 4/27/2006 | 4/27/2036 | R$ 3,325,188.47 | 6/1/2025 | Ativa | T2000-067 | Contrato de Concessão nº 007/2006 *(Considera adicional de RGR relativo à prorrogação do encargo) | ||
| AXIA Energia | LT 345 kV ITAPETI /TIJUCO PRETO SP | LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP | RB | FT LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP | 007/2006 | IPCA | RBL | CC 007/2006 | 4/27/2006 | 4/27/2036 | R$ 3,325,188.47 | 6/1/2025 | Ativa | T2000-067 | Contrato de Concessão nº 007/2006 *(Considera adicional de RGR relativo à prorrogação do encargo) | ||
| AXIA Energia | LT 345 kV ITUMBIARA /BANDEIRANTES MG/GO | LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 5,295,229.55 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV ITUMBIARA /BANDEIRANTES MG/GO | LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 20,319,793.20 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV ITUMBIARA /BANDEIRANTES MG/GO | LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO | RB | FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 5,295,229.55 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV ITUMBIARA /MONTE ALEGRE2 MG | LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | RB | FT LT 345 kV ITUMBIARA /MONTE ALEGRE2 C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,382,643.27 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV L.C.BARRETO /POCOS CALDAS SP/MG | LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG | RB | FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 5,795,334.56 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV L.C.BARRETO /POCOS CALDAS SP/MG | LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG | RB | FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 5,824,752.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV L.C.BARRETO /VOLTA GRANDE SP/MG | LT 345 kV L.C.BARRETO /VOLTA GRANDE C-1 SP/MG | RB | FT LT 345 kV L.C.BARRETO /VOLTA GRANDE C-1 SP/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,323,807.39 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV LAGOS /VENDA PEDRAS RJ | LT 345 kV LAGOS /VENDA PEDRAS C-1 RJ | RB | FT LT 345 kV LAGOS /VENDA PEDRAS C-1 RJ | 062/2001 | IPCA | RBNIA | REA 13338/2022 | R$382,329.33 | 6/1/2025 | Prevista | T2022-112 | Instalar o circuito LT 345 kV LAGOS /VENDA PEDRAS C-1 RJ originado do seccionamento do circuito LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ na SE LAGOS | ||||
| AXIA Energia | LT 345 kV MACAE MERCHAN /LAGOS RJ | LT 345 kV MACAE MERCHAN /LAGOS C-2 RJ | RB | FT LT 345 kV MACAE MERCHAN /LAGOS C-2 RJ | 062/2001 | IPCA | RBNIA | REA 13338/2022 | R$382,329.33 | 6/1/2025 | Prevista | T2022-112 | Instalar o circuito LT 345 kV MACAE MERCHAN /LAGOS C-1 RJ originado do seccionamento do circuito LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ na SE LAGOS | ||||
| AXIA Energia | LT 345 kV MACAE MERCHAN /LAGOS RJ | LT 345 kV MACAE MERCHAN /LAGOS C-1 RJ | RB | FT LT 345 kV MACAE MERCHAN /LAGOS C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,015.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV MACAE MERCHAN /LAGOS RJ | LT 345 kV MACAE MERCHAN /LAGOS C-1 RJ | RB | FT LT 345 kV MACAE MERCHAN /LAGOS C-1 RJ | 062/2001 | IPCA | RBNI | DSP 978/2024 | 11/1/2023 | 10/31/2057 | R$58,171.22 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 345 kV, circuito duplo, Lagos-Macaé Merchan C1, originado do seccionamento da Linha de Transmissão 345 kV Comperj - Macaé Merchan C1 na Subestação seccionadora Lagos, com 2,54 km de extensão. | |||
| AXIA Energia | LT 345 kV MACAE MERCHAN /VENDA PEDRAS RJ | LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ | RB | FT LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,588,988.92 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV MACAE MERCHAN /VENDA PEDRAS RJ | LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ | RB | FT LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ | 062/2001 | IPCA | RBNI | REA 5538/2015 | 3/6/2014 | 12/31/2042 | R$ 2,652,488.68 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 26 km da LT 345 kV Adrianópolis / Macaé Merchant, proveniente do seccionamento, transferida de Pedras para Furnas. Estabelecida pela REA 5.538/2015 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | LT 345 kV MACAE MERCHAN /VENDA PEDRAS RJ | LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ | RB | FT LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 13,772,304.28 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV MARIMBONDO /P. COLOMBIA MG | LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG | RB | FT LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,265,181.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV MOGI CRUZES /NORDESTE SP | LT 345 kV MOGI CRUZES /NORDESTE C-1 SP | RB | FT LT 345 kV MOGI CRUZES /NORDESTE C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$647,194.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV MONTE ALEGRE2 /P. COLOMBIA MG | LT 345 kV MONTE ALEGRE2 /P. COLOMBIA C-1 MG | RB | FT LT 345 kV MONTE ALEGRE2 /P. COLOMBIA C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 4,530,363.06 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV NOVA IGUACU /JACAREPAGUA RJ | LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ | RB | FT LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$735,448.55 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV NOVA IGUACU /JACAREPAGUA RJ | LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ | RB | FT LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ | 062/2001 | IPCA | RBNI | DSP 836/2024 | 4/28/2023 | 4/27/2058 | R$278,845.13 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 345 kV, circuito duplo, Nova Iguaçu-Jacarepaguá C1, originado do seccionamento da Linha de Transmissão 345 kV Adrianópolis - Jacarepaguá C1 na Subestação seccionadora Nova Iguaçu, com 11,8 km de extensão. | |||
| AXIA Energia | LT 345 kV P. COLOMBIA /VOLTA GRANDE MG | LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG | RB | FT LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,323,807.39 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV PADRE FIALHO /BARRO BRANCO MG | LT 345 kV PADRE FIALHO /BARRO BRANCO C-1 MG | RB | FT LT 345 kV PADRE FIALHO /BARRO BRANCO C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,341,487.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV PADRE FIALHO /BARRO BRANCO MG | LT 345 kV PADRE FIALHO /BARRO BRANCO C-1 MG | RB | FT LT 345 kV PADRE FIALHO /BARRO BRANCO C-1 MG | 062/2001 | IPCA | RBNI | REA 8920/2020 | 9/1/2017 | 12/31/2042 | R$10,581.11 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de um trecho de LT em 345 kV entre o ponto de seccionamento da LT 345 kV Outro Preto - Padre Fialho e a subestação seccionadora Barro Branco, com 0,6 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | LT 345 kV PIRINEUS /SAMAMBAIA GO/DF | LT 345 kV PIRINEUS /SAMAMBAIA C-1 GO/DF | RB | FT LT 345 kV PIRINEUS /SAMAMBAIA C-1 GO/DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,735,868.60 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV PIRINEUS /SAMAMBAIA GO/DF | LT 345 kV PIRINEUS /SAMAMBAIA C-1 GO/DF | RB | FT LT 345 kV PIRINEUS /SAMAMBAIA C-1 GO/DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 10,498,559.82 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV PIRINEUS /SAMAMBAIA GO/DF | LT 345 kV PIRINEUS /SAMAMBAIA C-1 GO/DF | RB | FT LT 345 kV PIRINEUS /SAMAMBAIA C-1 GO/DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 11,255,018.14 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV PIRINEUS /SAMAMBAIA GO/DF | LT 345 kV PIRINEUS /SAMAMBAIA C-1 GO/DF | RB | FT LT 345 kV PIRINEUS /SAMAMBAIA C-1 GO/DF | 062/2001 | IPCA | RBNI | DSP 854/2024 | 8/24/2023 | 8/23/2057 | R$32,719.96 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 345 kV, circuito duplo, Pirineus-Samambaia C1, originado do seccionamento da Linha de Transmissão 345 kV Bandeirantes - Samambaia C2 na Subestação seccionadora Pirineus, com 1,4 km de extensão. | |||
| AXIA Energia | LT 345 kV RIO NOVO DO SUL /VIANA ES | LT 345 kV RIO NOVO DO SUL /VIANA C-1 ES | RB | FT LT 345 kV RIO NOVO DO SUL /VIANA C-1 ES | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,353,435.36 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV RIO NOVO DO SUL /VIANA ES | LT 345 kV RIO NOVO DO SUL /VIANA C-1 ES | RB | FT LT 345 kV RIO NOVO DO SUL /VIANA C-1 ES | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 9,031,019.20 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV RIO NOVO DO SUL /VIANA ES | LT 345 kV RIO NOVO DO SUL /VIANA C-1 ES | RB | FT LT 345 kV RIO NOVO DO SUL /VIANA C-1 ES | 062/2001 | IPCA | RBNI | DSP 1405/2022 | 9/1/2020 | 12/31/2042 | R$52,670.32 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho com 2 km de extensão da Linha de Transmissão 345 kV Rio Novo do Sul - Viana C1, circuito simples, derivada do seccionamento da Linha de Transmissão 345 kV Campos - Viana na SE Rio Novo do Sul. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | LT 345 kV RIO NOVO DO SUL /VITORIA ES | LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES | RB | FT LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,088,883.90 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV RIO NOVO DO SUL /VITORIA ES | LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES | RB | FT LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 11,853,212.70 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV RIO NOVO DO SUL /VITORIA ES | LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES | RB | FT LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES | 062/2001 | IPCA | RBNI | DSP 1405/2022 | 12/21/2020 | 12/31/2042 | R$52,670.32 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho com 2 km de extensão da Linha de Transmissão 345 kV Rio Novo do Sul - Vitória C1, circuito simples, derivada do seccionamento da Linha de Transmissão 345 kV Campos - Vitória na SE Rio Novo do Sul. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | LT 345 kV SARZEDO /PIMENTA MG | LT 345 kV SARZEDO /PIMENTA C-1 MG | RB | FT LT 345 kV SARZEDO /PIMENTA C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 5,236,393.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV SARZEDO /PIMENTA MG | LT 345 kV SARZEDO /PIMENTA C-1 MG | RB | FT LT 345 kV SARZEDO /PIMENTA C-1 MG | 062/2001 | IPCA | RBNI | DSP 777/2024 | 9/6/2023 | 9/5/2057 | R$32,630.19 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 345 kV, circuito duplo, Sarzedo-Pimenta C1, originado do seccionamento da Linha de Transmissão 345 kV Barreiro 1 - Pimenta C1 na Subestação seccionadora Sarzedo, com 1,38 km de extensão. | |||
| AXIA Energia | LT 345 kV SUL /TIJUCO PRETO SP | LT 345 kV SUL /TIJUCO PRETO C-1 SP | RB | FT LT 345 kV SUL /TIJUCO PRETO C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$633,167.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV SUL /TIJUCO PRETO SP | LT 345 kV SUL /TIJUCO PRETO C-1 SP | RB | FT LT 345 kV SUL /TIJUCO PRETO C-1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,429,703.60 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV VARGINHA 4 /ITUTINGA MG | LT 345 kV VARGINHA 4 /ITUTINGA C-1 MG | RB | FT LT 345 kV VARGINHA 4 /ITUTINGA C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,601,853.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV VARGINHA 4 /ITUTINGA MG | LT 345 kV VARGINHA 4 /ITUTINGA C-1 MG | RB | FT LT 345 kV VARGINHA 4 /ITUTINGA C-1 MG | 062/2001 | IPCA | RBNI | DSP 488/2025 | 12/20/2024 | 12/19/2059 | R$916,586.30 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 345 kV, circuito simples, Varginha 4 - Itutinga C1, originado do seccionamento da Linha de Transmissão 345 kV Furnas - Itutinga C2 na Subestação seccionadora Varginha 4, com 34,8 km de extensão. | |||
| AXIA Energia | LT 345 kV VIANA /VITORIA ES | LT 345 kV VIANA /VITORIA C-1 ES | RB | FT LT 345 kV VIANA /VITORIA C-1 ES | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$841,353.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV VIANA /VITORIA ES | LT 345 kV VIANA /VITORIA C-1 ES | RB | FT LT 345 kV VIANA /VITORIA C-1 ES | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,228,589.36 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 345 kV VITORIA /PADRE FIALHO ES/MG | LT 345 kV VITORIA /PADRE FIALHO C-1 ES/MG | RB | FT LT 345 kV VITORIA /PADRE FIALHO C-1 ES/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 6,584,097.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV ABDON BATISTA /C.NOVOS SC | LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC | RB | FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC | 010/2005 | IGPM | RBL | CC 010/2005 | 9/17/2006 | 3/4/2035 | R$ 7,535,603.86 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2005 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | LT 500 kV ABDON BATISTA /C.NOVOS SC | LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC | RB | FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC | 010/2005 | IGPM | RBNI | REA 485/2006 | 5/25/2008 | 5/24/2041 | R$149,262.75 | 6/1/2025 | Ativa | T2012-054-A | Receita resultante do seccionamento do circuito LT 525 kV BIGUACU /C.NOVOS C-1 SC na SE ABDON BATISTA . Instalar o circuito C1 da LT 525 kV BIGUACU /C.NOVOS SC originado do seccionamento do circuito LT 525 kV BLUMENAU /C.NOVOS C-2 SC na SE BIGUACU *(Receita revisada em 16/06/2010) * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Sul | LT 500 kV ABDON BATISTA /C.NOVOS SC | LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC | RB | FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC | 010/2005 | IGPM | RBNI | REA 485/2006 | 5/25/2008 | 5/24/2041 | R$5,724.19 | 6/1/2025 | Ativa | T2012-054-A | Receita resultante do seccionamento do circuito LT 525 kV BIGUACU /C.NOVOS C-1 SC na SE ABDON BATISTA . Substituição de 30,7 km de cabos pára-raios da Linha de Transmissão, em 500 kV, Campos Novos – Blumenau, por cabos Dotterel. *(Receita revisada em 16/06/2010) * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Sul | LT 500 kV ABDON BATISTA /C.NOVOS SC | LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC | RB | FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC | 010/2005 | IGPM | RBNI | REA 5904/2016 | 1/22/2016 | 3/3/2035 | R$67,622.73 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de um trecho de linha de transmissão em 525 kV, circuito simples, entre o ponto de seccionamento da linha de transmissão 525 kV Campos Novos - Biguaçu e a subestação seccionadora Abdon Batista, com 1 km de extensão, com um cabo para raios convencional e cabo OPGW 24 fibras. *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia | LT 500 kV ADRIANOPOLIS /B. FLUMINENSE RJ | LT 500 kV ADRIANOPOLIS /B. FLUMINENSE C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /B. FLUMINENSE C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$744,155.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ADRIANOPOLIS /GRAJAU RJ | LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,823,478.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ADRIANOPOLIS /GRAJAU RJ | LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 10,834,753.11 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ADRIANOPOLIS /SAO JOSE RJ | LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,694,087.27 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ADRIANOPOLIS /SAO JOSE RJ | LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,500,851.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ADRIANOPOLIS /SAO JOSE RJ | LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 6,969,261.20 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ADRIANOPOLIS /TERMINAL RIO RJ | LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ | RB | FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,275,695.39 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ADRIANOPOLIS /TERMINAL RIO RJ | LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ | RB | FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ | 062/2001 | IPCA | RBNI | DSP 1387/2022 | 8/10/2020 | 12/31/2042 | R$32,761.11 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho com 1 km de extensão da Linha de Transmissão 500 kV Adrianópolis - Terminal Rio C2, circuito simples, derivada do seccionamento da Linha de Transmissão 500 kV Adrianópolis - Resende C1 na SE Terminal Rio. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | LT 500 kV ADRIANOPOLIS /TERMINAL RIO RJ | LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,275,695.39 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ADRIANOPOLIS /TERMINAL RIO RJ | LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,895,324.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ADRIANOPOLIS /TERMINAL RIO RJ | LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ | RB | FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ | 062/2001 | IPCA | RBNI | DSP 1387/2022 | 10/6/2020 | 12/31/2042 | R$32,761.11 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho com 1 km de extensão da Linha de Transmissão 500 kV Adrianópolis - Terminal Rio C1, circuito simples, derivada do seccionamento da Linha de Transmissão 500 kV Adrianópolis - Cachoeira Paulista C1 na SE Terminal Rio. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV ANGELIM II /PAU FERRO PE | LT 500 kV ANGELIM II /PAU FERRO C-1 PE | RB | FT LT 500 kV ANGELIM II /PAU FERRO C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 7,261,882.85 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV ANGELIM II /PAU FERRO PE | LT 500 kV ANGELIM II /PAU FERRO C-1 PE | RB | FT LT 500 kV ANGELIM II /PAU FERRO C-1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 20,378,070.31 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV ANGELIM II /PAU FERRO PE | LT 500 kV ANGELIM II /PAU FERRO C-1 PE | RB | FT LT 500 kV ANGELIM II /PAU FERRO C-1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/12/2019 | 9/15/2056 | R$62,150.80 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV ANGELIM II /SUAPE II PE | LT 500 kV ANGELIM II /SUAPE II C-1 PE | RB | FT LT 500 kV ANGELIM II /SUAPE II C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 6,765,773.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV ANGELIM II /SUAPE II PE | LT 500 kV ANGELIM II /SUAPE II C-1 PE | RB | FT LT 500 kV ANGELIM II /SUAPE II C-1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 18,985,904.05 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV ANGELIM II /SUAPE II PE | LT 500 kV ANGELIM II /SUAPE II C-1 PE | RB | FT LT 500 kV ANGELIM II /SUAPE II C-1 PE | 061/2001 | IPCA | RBNI | REA 8328/2019 | 11/29/2017 | 11/28/2050 | R$769,844.05 | 6/1/2025 | Ativa | T2019-073 | Receita resultante do seccionamento do circuito LT 500 kV ANGELIM II /RECIFE II C-2 PE na SE SUAPE II. Substituir cabo para raios convencional por 170 km de cabo para raios com 36 fibras óticas, na LT 500 kV Angelim - Recife II C2. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 500 kV ANGELIM II /SUAPE II PE | LT 500 kV ANGELIM II /SUAPE II C-1 PE | RB | FT LT 500 kV ANGELIM II /SUAPE II C-1 PE | 061/2001 | IPCA | RBNI | REA 8328/2019 | 5/26/2025 | 5/25/2053 | R$ 5,556,667.86 | 6/1/2025 | Ativa | T2019-073 | Instalar trecho de 24,87 kmda LT 500 kV ANGELIM II /SUAPE II C-2 PE originado do seccionamento do circuito LT 500 kV ANGELIM II /RECIFE II C-2 PE na SE SUAPE II | ||
| AXIA Energia Nordeste | LT 500 kV ANGELIM II /SUAPE II PE | LT 500 kV ANGELIM II /SUAPE II C-1 PE | RB | FT LT 500 kV ANGELIM II /SUAPE II C-1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/31/2023 | 2/4/2060 | R$389,958.88 | 6/1/2025 | Ativa | T2019-073 | Receita resultante do seccionamento do circuito LT 500 kV ANGELIM II /RECIFE II C-2 PE na SE SUAPE II. Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||
| AXIA Energia Nordeste | LT 500 kV ANGELIM II /SUAPE II PE | LT 500 kV ANGELIM II /SUAPE II C-1 PE | RB | FT LT 500 kV ANGELIM II /SUAPE II C-1 PE | 061/2001 | IPCA | RBNI | REA 8328/2019 | 5/26/2025 | 5/25/2054 | R$172,756.28 | 6/1/2025 | Ativa | T2019-073 | Receita resultante do seccionamento do circuito LT 500 kV ANGELIM II /RECIFE II C-2 PE na SE SUAPE II. Troca de cabos para-raios e cadeias de isoladores em trechos de 6 km (a partir da SE Recife II) e de 3 km (a partir da SE Angelim II) em função do seccionamento da LT 500kV Angelim II - Recife II C2 na SE Suape II causar superação dos níveis de curto-circuito segundo estudos da Chesf. | ||
| AXIA Energia | LT 500 kV ANGRA FUR /C. PAULISTA RJ/SP | LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP | RB | FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 4,379,887.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ANGRA FUR /C. PAULISTA RJ/SP | LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP | RB | FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 16,807,280.47 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ANGRA FUR /NOVA IGUACU RJ | LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ | RB | FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 4,677,549.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ANGRA FUR /NOVA IGUACU RJ | LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ | RB | FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 17,949,522.84 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ANGRA FUR /NOVA IGUACU RJ | LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ | RB | FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 19,242,849.35 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ANGRA FUR /NOVA IGUACU RJ | LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ | RB | FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ | 062/2001 | IPCA | RBNI | DSP 836/2024 | 4/28/2023 | 4/27/2058 | R$8,427.53 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito duplo, Angra -Nova Iguaçu C1, originado do seccionamento da Linha de Transmissão 500 kV Angra - São José C1 na Subestação seccionadora Nova Iguaçu, com 0,2 km de extensão. | |||
| AXIA Energia | LT 500 kV ANGRA FUR /ZONA OESTE RJ | LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ | RB | FT LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,699,516.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ANGRA FUR /ZONA OESTE RJ | LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ | RB | FT LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 14,196,440.79 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ANGRA FUR /ZONA OESTE RJ | LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ | RB | FT LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 15,219,344.49 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ARARAQUARA FURNAS /CAMPINAS SP | LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | RB | FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 7,271,463.71 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ARARAQUARA FURNAS /CAMPINAS SP | LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | RB | FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 27,903,349.14 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS SP/MG | LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG | RB | FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 7,484,079.61 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS SP/MG | LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG | RB | FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 28,719,236.54 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV AREIA /BATEIAS PR | LT 500 kV AREIA /BATEIAS C-1 PR | RB | FT LT 500 kV AREIA /BATEIAS C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 8,492,350.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV AREIA /BATEIAS PR | LT 500 kV AREIA /BATEIAS C-1 PR | RB | FT LT 500 kV AREIA /BATEIAS C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 14,904,772.74 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV AREIA /BENTO MUNHOZ PR | LT 500 kV AREIA /BENTO MUNHOZ C-2 PR | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$504,221.27 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 500 kV AREIA /BENTO MUNHOZ PR | LT 500 kV AREIA /BENTO MUNHOZ C-2 PR | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$884,949.74 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 500 kV AREIA /BENTO MUNHOZ PR | LT 500 kV AREIA /BENTO MUNHOZ C-2 PR | DIT | 057/2001 | IPCA | RMEL | REA 7759/2019 | 5/27/2019 | 5/26/2052 | R$24,882.42 | 6/1/2025 | Ativa | T2019-009 | Adequação na LT 525 kV AREIA / BENTO MUNHOZ C-2, com a substituição de sistema de aterramento e de cabos contrapeso em 26 torres. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | LT 500 kV AREIA /BENTO MUNHOZ PR | LT 500 kV AREIA /BENTO MUNHOZ C-1 PR | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$494,969.51 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 500 kV AREIA /BENTO MUNHOZ PR | LT 500 kV AREIA /BENTO MUNHOZ C-1 PR | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$868,712.13 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 500 kV AREIA /C.NOVOS PR/SC | LT 500 kV AREIA /C.NOVOS C-1 PR/SC | RB | FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 6,796,193.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV AREIA /C.NOVOS PR/SC | LT 500 kV AREIA /C.NOVOS C-1 PR/SC | RB | FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 11,927,877.60 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV AREIA /CURITIBA PR | LT 500 kV AREIA /CURITIBA C-1 PR | RB | FT LT 500 kV AREIA /CURITIBA C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 9,090,631.55 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV AREIA /CURITIBA PR | LT 500 kV AREIA /CURITIBA C-1 PR | RB | FT LT 500 kV AREIA /CURITIBA C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 15,954,804.85 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV AREIA /IVAIPORA PR | LT 500 kV AREIA /IVAIPORA C-1 PR | RB | FT LT 500 kV AREIA /IVAIPORA C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 6,676,691.48 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV AREIA /IVAIPORA PR | LT 500 kV AREIA /IVAIPORA C-1 PR | RB | FT LT 500 kV AREIA /IVAIPORA C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 11,718,141.80 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV AREIA /SEGREDO PR | LT 500 kV AREIA /SEGREDO C-1 PR | RB | FT LT 500 kV AREIA /SEGREDO C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,228,133.76 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV AREIA /SEGREDO PR | LT 500 kV AREIA /SEGREDO C-1 PR | RB | FT LT 500 kV AREIA /SEGREDO C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,910,557.71 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV AREIA /SEGREDO PR | LT 500 kV AREIA /SEGREDO C-1 PR | RB | FT LT 500 kV AREIA /SEGREDO C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 3,312,310.60 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV B. FLUMINENSE /C. PAULISTA RJ/SP | LT 500 kV B. FLUMINENSE /C. PAULISTA C-1 RJ/SP | RB | FT LT 500 kV B. FLUMINENSE /C. PAULISTA C-1 RJ/SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 6,803,708.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV B.DESPACHO 3 /OURO PRETO 2 MG | LT 500 kV B.DESPACHO 3 /OURO PRETO 2 C-1 MG | RB | FT LT 500 kV B.DESPACHO 3 /OURO PRETO 2 C-1 MG | 003/2009 | IPCA | RBL | CC 003/2009 | 1/28/2009 | 1/28/2039 | R$ 12,747,361.84 | 6/1/2025 | Ativa | T2009-194 | Contrato de Concessão nº 003/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | LT 500 kV BACABEIRA /MIRANDA II MA | LT 500 kV BACABEIRA /MIRANDA II C-2 MA | RB | FT LT 500 kV BACABEIRA /MIRANDA II C-2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,640,310.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV BACABEIRA /MIRANDA II MA | LT 500 kV BACABEIRA /MIRANDA II C-2 MA | RB | FT LT 500 kV BACABEIRA /MIRANDA II C-2 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 7,902,836.19 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV BACABEIRA /MIRANDA II MA | LT 500 kV BACABEIRA /MIRANDA II C-2 MA | RB | FT LT 500 kV BACABEIRA /MIRANDA II C-2 MA | 058/2001 | IPCA | RBNI | DSP 554/2023 | 9/9/2019 | 12/31/2042 | R$57,889.29 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito simples, Miranda II - Bacabeira C2, originado do seccionamento da Linha de Transmissão 500 kV Miranda II - São Luís II C2 na Subestação seccionadora Bacabeira, com 1,62 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | LT 500 kV BACABEIRA /MIRANDA II MA | LT 500 kV BACABEIRA /MIRANDA II C-2 MA | RB | FT LT 500 kV BACABEIRA /MIRANDA II C-2 MA | 058/2001 | IPCA | RBNI | DSP 622/2025 | 6/21/2024 | 6/20/2059 | R$35,589.30 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito simples, Bacabeira - Miranda II C2, originado do seccionamento da Linha de Transmissão 500 kV Presidente Dutra -São Luís II C1 na Subestação seccionadora Miranda II (e, posteriormente, na SE Bacabeira), com 0,9 km de extensão. | |||
| AXIA Energia Norte | LT 500 kV BACABEIRA /MIRANDA II MA | LT 500 kV BACABEIRA /MIRANDA II C-1 MA | RB | FT LT 500 kV BACABEIRA /MIRANDA II C-1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,637,552.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV BACABEIRA /MIRANDA II MA | LT 500 kV BACABEIRA /MIRANDA II C-1 MA | RB | FT LT 500 kV BACABEIRA /MIRANDA II C-1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 7,896,848.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV BACABEIRA /MIRANDA II MA | LT 500 kV BACABEIRA /MIRANDA II C-1 MA | RB | FT LT 500 kV BACABEIRA /MIRANDA II C-1 MA | 058/2001 | IPCA | RBNI | DSP 554/2023 | 9/26/2019 | 12/31/2042 | R$59,201.95 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito simples, Miranda II - Bacabeira C1, originado do seccionamento da Linha de Transmissão 500 kV Miranda II - São Luís II C1 na Subestação seccionadora Bacabeira, com 1,68 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | LT 500 kV BACABEIRA /MIRANDA II MA | LT 500 kV BACABEIRA /MIRANDA II C-1 MA | RB | FT LT 500 kV BACABEIRA /MIRANDA II C-1 MA | 058/2001 | IPCA | RBNI | DSP 622/2025 | 6/21/2024 | 6/20/2059 | R$35,589.30 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito simples, Bacabeira - Miranda II C1, originado do seccionamento da Linha de Transmissão 500 kV Presidente Dutra -São Luís II C1 na Subestação seccionadora Miranda II (e, posteriormente, na SE Bacabeira), com 0,9 km de extensão. | |||
| AXIA Energia Sul | LT 500 kV BIGUACU /ABDON BATISTA SC | LT 500 kV BIGUACU /ABDON BATISTA C-1 SC | RB | FT LT 500 kV BIGUACU /ABDON BATISTA C-1 SC | 010/2005 | IGPM | RBL | CC 010/2005 | 9/17/2006 | 3/4/2035 | R$ 43,216,688.08 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2005 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | LT 500 kV BIGUACU /ABDON BATISTA SC | LT 500 kV BIGUACU /ABDON BATISTA C-1 SC | RB | FT LT 500 kV BIGUACU /ABDON BATISTA C-1 SC | 010/2005 | IGPM | RBNI | REA 485/2006 | 5/25/2008 | 5/24/2041 | R$856,021.85 | 6/1/2025 | Ativa | T2012-054-A | Receita resultante do seccionamento do circuito LT 525 kV BIGUACU /C.NOVOS C-1 SC na SE ABDON BATISTA . Instalar o circuito C1 da LT 525 kV BIGUACU /C.NOVOS SC originado do seccionamento do circuito LT 525 kV BLUMENAU /C.NOVOS C-2 SC na SE BIGUACU *(Receita revisada em 16/06/2010) * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Sul | LT 500 kV BIGUACU /ABDON BATISTA SC | LT 500 kV BIGUACU /ABDON BATISTA C-1 SC | RB | FT LT 500 kV BIGUACU /ABDON BATISTA C-1 SC | 010/2005 | IGPM | RBNI | REA 485/2006 | 5/25/2008 | 5/24/2041 | R$32,828.23 | 6/1/2025 | Ativa | T2012-054-A | Receita resultante do seccionamento do circuito LT 525 kV BIGUACU /C.NOVOS C-1 SC na SE ABDON BATISTA . Substituição de 30,7 km de cabos pára-raios da Linha de Transmissão, em 500 kV, Campos Novos – Blumenau, por cabos Dotterel. *(Receita revisada em 16/06/2010) * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Sul | LT 500 kV BIGUACU /ABDON BATISTA SC | LT 500 kV BIGUACU /ABDON BATISTA C-1 SC | RB | FT LT 500 kV BIGUACU /ABDON BATISTA C-1 SC | 010/2005 | IGPM | RBNI | REA 5904/2016 | 1/22/2016 | 3/3/2035 | R$68,770.81 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de um trecho de linha de transmissão em 525 kV, circuito simples, entre o ponto de seccionamento da linha de transmissão 525 kV Campos Novos - Biguaçu e a subestação seccionadora Abdon Batista, com 1 km de extensão, com dois cabos para raios convencional e cabo OPGW 24 fibras. *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Sul | LT 500 kV BIGUACU /GASPAR 2 SC | LT 500 kV BIGUACU /GASPAR 2 C-1 SC | RB | FT LT 500 kV BIGUACU /GASPAR 2 C-1 SC | 010/2005 | IGPM | RBL | CC 010/2005 | 9/17/2006 | 3/4/2035 | R$ 14,059,584.14 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2005 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | LT 500 kV BIGUACU /GASPAR 2 SC | LT 500 kV BIGUACU /GASPAR 2 C-1 SC | RB | FT LT 500 kV BIGUACU /GASPAR 2 C-1 SC | 010/2005 | IGPM | RBNI | REA 485/2006 | 5/25/2008 | 9/15/2041 | R$864,271.83 | 6/1/2025 | Ativa | T2019-034-B | Receita resultante do seccionamento do circuito LT 500 kV BIGUACU /BLUMENAU C-1 SC na SE GASPAR 2. Instalar o circuito C1 da LT 525 kV BLUMENAU /BIGUACU SC originado do seccionamento do circuito LT 525 kV BLUMENAU /C.NOVOS C-2 SC na SE BIGUACU *(Receita revisada em 16/06/2010) * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Sul | LT 500 kV BIGUACU /GASPAR 2 SC | LT 500 kV BIGUACU /GASPAR 2 C-1 SC | RB | FT LT 500 kV BIGUACU /GASPAR 2 C-1 SC | 010/2005 | IGPM | RBNI | REA 485/2006 | 5/25/2008 | 5/24/2041 | R$33,144.62 | 6/1/2025 | Ativa | T2019-034-B | Receita resultante do seccionamento do circuito LT 500 kV BIGUACU /BLUMENAU C-1 SC na SE GASPAR 2. Substituição de 30,7 km de cabos pára-raios da Linha de Transmissão, em 500 kV, Campos Novos – Blumenau, por cabos Dotterel. *(Receita revisada em 16/06/2010) * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Sul | LT 500 kV BIGUACU /GASPAR 2 SC | LT 500 kV BIGUACU /GASPAR 2 C-1 SC | RB | FT LT 500 kV BIGUACU /GASPAR 2 C-1 SC | 010/2005 | IGPM | RBNI | DSP 543/2025 | 12/30/2024 | 12/29/2059 | R$416,167.53 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV Biguaçu -Gaspar 2 C1, circuito duplo, para seccionamento da Linha de Transmissão 500 kV Biguaçu -Blumenau C1 na Subestação seccionadora Gaspar 2, com 8,7 km de extensão. | |||
| Nova Era Integração | LT 500 kV BOM NOME II /CAMPO FORMOSO II PE/BA | LT 500 kV BOM NOME II /CAMPO FORMOSO II C-1 PE/BA | RB | FT LT 500 kV BOM NOME II /CAMPO FORMOSO II C-1 PE/BA | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 73,655,340.41 | 6/1/2025 | Prevista | T2024-197-F | LT 500 kV Bom Nome II – Campo Formoso II C1 | ||||
| Nova Era Integração | LT 500 kV BOM NOME II /ZEBU III PE/AL | LT 500 kV BOM NOME II /ZEBU III C-1 PE/AL | RB | FT LT 500 kV BOM NOME II /ZEBU III C-1 PE/AL | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 36,644,328.13 | 6/1/2025 | Prevista | T2024-197-A | LT 500 kV Bom Nome II – Zebu III C1 | ||||
| VSB | LT 500 kV BRASILIA LESTE /LUZIANIA DF/GO | LT 500 kV BRASILIA LESTE /LUZIANIA C-2 DF/GO | RB | FT LT 500 kV BRASILIA LESTE /LUZIANIA C-2 DF/GO | 014/2013 | IPCA | RBL | CC 014/2013 | 2/19/2018 | 10/9/2043 | R$ 6,854,609.30 | 6/1/2025 | Ativa | T2014-015-B | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| VSB | LT 500 kV BRASILIA LESTE /LUZIANIA DF/GO | LT 500 kV BRASILIA LESTE /LUZIANIA C-1 DF/GO | RB | FT LT 500 kV BRASILIA LESTE /LUZIANIA C-1 DF/GO | 014/2013 | IPCA | RBL | CC 014/2013 | 2/19/2018 | 10/9/2043 | R$ 7,113,807.55 | 6/1/2025 | Ativa | T2014-015-A | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia | LT 500 kV C. PAULISTA /FERNAO DIAS SP | LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP | RB | FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,551,390.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV C. PAULISTA /FERNAO DIAS SP | LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP | RB | FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 9,790,648.82 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV C. PAULISTA /FERNAO DIAS SP | LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP | RB | FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP | 062/2001 | IPCA | RBNI | DSP 199/2023 | 1/26/2021 | 12/31/2042 | R$134,919.42 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito simples, Fernão Dias-Cachoeira Paulista C1, originado do seccionamento da Linha de Transmissão 500 kV Campinas - Cachoeira Paulista C1, e a Subestação seccionadora Fernão Dias, com 4,27 km de extensão.r *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | LT 500 kV C. PAULISTA /ITAJUBA 3 SP/MG | LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG | RB | FT LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,253,728.52 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV C. PAULISTA /ITAJUBA 3 SP/MG | LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG | RB | FT LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 8,648,406.46 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV C. PAULISTA /RESENDE SP/RJ | LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ | RB | FT LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,381,298.06 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV C. PAULISTA /RESENDE SP/RJ | LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ | RB | FT LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 9,137,938.90 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV C. PAULISTA /RESENDE SP/RJ | LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ | RB | FT LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ | 062/2001 | IPCA | RBNI | DSP 183/2023 | 12/23/2020 | 12/31/2042 | R$33,986.91 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito simples, Resende-Cachoeira Paulista C1, originado do seccionamento da Linha de Transmissão 500 kV Adrianópolis - Cachoeira Paulista C2, e a Subestação seccionadora Resende, com 1 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | LT 500 kV C. PAULISTA /TAUBATE SP | LT 500 kV C. PAULISTA /TAUBATE C-1 SP | RB | FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,529,423.91 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV C. PAULISTA /TAUBATE SP | LT 500 kV C. PAULISTA /TAUBATE C-1 SP | RB | FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 13,543,730.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV C. PAULISTA /TAUBATE SP | LT 500 kV C. PAULISTA /TAUBATE C-1 SP | RB | FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP | 062/2001 | IPCA | RBNI | REA 4347/2013 | 3/28/2017 | 3/27/2045 | R$10,313.65 | 6/1/2025 | Ativa | Substituição de RDP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | LT 500 kV C. PAULISTA /TAUBATE SP | LT 500 kV C. PAULISTA /TAUBATE C-1 SP | RB | FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/28/2017 | 2/23/2040 | R$200,538.82 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | LT 500 kV C. PAULISTA /TIJUCO PRETO SP | LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP | RB | FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 7,696,695.51 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV C. PAULISTA /TIJUCO PRETO SP | LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP | RB | FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 29,535,123.94 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV C. PAULISTA /TIJUCO PRETO SP | LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP | RB | FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 31,663,233.94 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV C.NOVOS /CAXIAS NORTE SC/RS | LT 500 kV C.NOVOS /CAXIAS NORTE C-1 SC/RS | RB | FT LT 500 kV C.NOVOS /CAXIAS NORTE C-1 SC/RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 6,487,801.25 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV C.NOVOS /CAXIAS NORTE SC/RS | LT 500 kV C.NOVOS /CAXIAS NORTE C-1 SC/RS | RB | FT LT 500 kV C.NOVOS /CAXIAS NORTE C-1 SC/RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 11,386,623.93 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV C.NOVOS /CAXIAS NORTE SC/RS | LT 500 kV C.NOVOS /CAXIAS NORTE C-1 SC/RS | RB | FT LT 500 kV C.NOVOS /CAXIAS NORTE C-1 SC/RS | 057/2001 | IPCA | RBNI | DSP 540/2025 | 1/13/2025 | 1/12/2060 | R$433,294.83 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito duplo, Campos Novos -Caxias Norte C1, originado do seccionamento da Linha de Transmissão 500 kV Campos Novos - Caxias C1 na Subestação seccionadora Caxias Norte, com 11,3 km de extensão. | |||
| AXIA Energia Sul | LT 500 kV C.NOVOS /MACHADINHO SC | LT 500 kV C.NOVOS /MACHADINHO C-1 SC | RB | FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,939,787.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV C.NOVOS /MACHADINHO SC | LT 500 kV C.NOVOS /MACHADINHO C-1 SC | RB | FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,404,485.54 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV C.NOVOS /MACHADINHO SC | LT 500 kV C.NOVOS /MACHADINHO C-1 SC | RB | FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,883,658.64 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV CAMACARI IV /CAMACARI II BA | LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | RB | FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,306.21 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV CAMACARI IV /CAMACARI II BA | LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | RB | FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$124,330.71 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV CAMACARI IV /CAMACARI II BA | LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | RB | FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$114,617.72 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV CAMACARI IV /CAMACARI II BA | LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | RB | FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA | 061/2001 | IPCA | RBNI | REA 10135/2021 | 8/15/2016 | 12/31/2042 | R$8,136.07 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 500 kV, circuito simples, entre o ponto de seccionamento da linha de transmissão 500 kV Jardim - Camaçari II e a subestação seccionadora Camaçari IV, com 0,5 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | LT 500 kV CASCAVEL OEST /IVAIPORA PR | LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR | RB | FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR | 004/2004 | IGPM | RBL | CC 004/2004 | 10/31/2005 | 2/18/2034 | R$ 35,719,943.39 | 6/1/2025 | Ativa | Contrato de Concessão nº 004/2004 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | LT 500 kV CAXIAS NORTE /CAXIAS RS | LT 500 kV CAXIAS NORTE /CAXIAS C-2 RS | RB | FT LT 500 kV CAXIAS NORTE /CAXIAS C-2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,002,274.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV CAXIAS NORTE /CAXIAS RS | LT 500 kV CAXIAS NORTE /CAXIAS C-2 RS | RB | FT LT 500 kV CAXIAS NORTE /CAXIAS C-2 RS | 057/2001 | IPCA | RBNI | DSP 540/2025 | 11/1/2024 | 10/31/2059 | R$447,058.25 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito duplo, Caxias Norte-Caxias C2, originado do seccionamento da Linha de Transmissão 500 kV Itá - Caxias C1 na Subestação seccionadora Caxias Norte, com 11,62 km de extensão. | |||
| AXIA Energia Sul | LT 500 kV CAXIAS NORTE /CAXIAS RS | LT 500 kV CAXIAS NORTE /CAXIAS C-1 RS | RB | FT LT 500 kV CAXIAS NORTE /CAXIAS C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,349,215.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV CAXIAS NORTE /CAXIAS RS | LT 500 kV CAXIAS NORTE /CAXIAS C-1 RS | RB | FT LT 500 kV CAXIAS NORTE /CAXIAS C-1 RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,367,984.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV CAXIAS NORTE /CAXIAS RS | LT 500 kV CAXIAS NORTE /CAXIAS C-1 RS | RB | FT LT 500 kV CAXIAS NORTE /CAXIAS C-1 RS | 057/2001 | IPCA | RBNI | DSP 540/2025 | 1/13/2025 | 1/12/2060 | R$433,294.83 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito duplo, Caxias Norte-Caxias C1, originado do seccionamento da Linha de Transmissão 500 kV Campos Novos - Caxias C1 na Subestação seccionadora Caxias Norte, com 11,3 km de extensão. | |||
| AXIA Energia Sul | LT 500 kV CAXIAS NORTE /ITA RS/SC | LT 500 kV CAXIAS NORTE /ITA C-1 RS/SC | RB | FT LT 500 kV CAXIAS NORTE /ITA C-1 RS/SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 8,866,276.21 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV CAXIAS NORTE /ITA RS/SC | LT 500 kV CAXIAS NORTE /ITA C-1 RS/SC | RB | FT LT 500 kV CAXIAS NORTE /ITA C-1 RS/SC | 057/2001 | IPCA | RBNI | DSP 540/2025 | 11/1/2024 | 10/31/2059 | R$447,058.25 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito duplo, Itá -Caxias Norte C1, originado do seccionamento da Linha de Transmissão 500 kV Itá - Caxias C1 na Subestação seccionadora Caxias Norte, com 11,62 km de extensão. | |||
| AXIA Energia Nordeste | LT 500 kV CEARA MIRIM II /C.GRANDE III RN/PB | LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB | RB | FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB | 008/2011 | IPCA | RBL | CC 008/2011 | 5/13/2015 | 10/13/2041 | R$ 15,042,047.71 | 6/1/2025 | Ativa | T2011-180-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | LT 500 kV COLINAS /MIRACEMA TO | LT 500 kV COLINAS /MIRACEMA C-1 TO | RB | FT LT 500 kV COLINAS /MIRACEMA C-1 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 9,238,851.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV COLINAS /MIRACEMA TO | LT 500 kV COLINAS /MIRACEMA C-1 TO | RB | FT LT 500 kV COLINAS /MIRACEMA C-1 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 20,056,841.25 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV COLINAS /MIRACEMA TO | LT 500 kV COLINAS /MIRACEMA C-1 TO | RB | FT LT 500 kV COLINAS /MIRACEMA C-1 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 19,236,456.70 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| NOVA ERA TERESINA | LT 500 kV CRATEUS /TERESINA IV CE/PI | LT 500 kV CRATEUS /TERESINA IV C-1 CE/PI | RB | FT LT 500 kV CRATEUS /TERESINA IV C-1 CE/PI | 004/2024 | IPCA | RBL | CC 004/2024 | R$ 48,318,690.01 | 6/1/2025 | Prevista | T2024-193-A | LT 500kV Crateús – Teresina IV C1 | ||||
| AXIA Energia Sul | LT 500 kV CURITIBA /BATEIAS PR | LT 500 kV CURITIBA /BATEIAS C-1 PR | RB | FT LT 500 kV CURITIBA /BATEIAS C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,291,392.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV CURITIBA /BATEIAS PR | LT 500 kV CURITIBA /BATEIAS C-1 PR | RB | FT LT 500 kV CURITIBA /BATEIAS C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,266,499.71 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV FERNAO DIAS /CAMPINAS SP | LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP | RB | FT LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 6,931,278.27 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV FERNAO DIAS /CAMPINAS SP | LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP | RB | FT LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 26,597,929.29 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV FERNAO DIAS /CAMPINAS SP | LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP | RB | FT LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP | 062/2001 | IPCA | RBNI | DSP 199/2023 | 1/26/2021 | 12/31/2042 | R$134,919.42 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito simples, Campinas -Fernão Dias C1, originado do seccionamento da Linha de Transmissão 500 kV Campinas - Cachoeira Paulista C1, e a Subestação seccionadora Fernão Dias, com 4,27 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV FUTURA /U.SOBRADINHO BA | LT 500 kV FUTURA /U.SOBRADINHO C-1 BA | RB | FT LT 500 kV FUTURA /U.SOBRADINHO C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$859,785.71 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV FUTURA /U.SOBRADINHO BA | LT 500 kV FUTURA /U.SOBRADINHO C-1 BA | RB | FT LT 500 kV FUTURA /U.SOBRADINHO C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,412,703.99 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV FUTURA /U.SOBRADINHO BA | LT 500 kV FUTURA /U.SOBRADINHO C-1 BA | RB | FT LT 500 kV FUTURA /U.SOBRADINHO C-1 BA | 061/2001 | IPCA | RBNI | REA 9689/2021 | 7/31/2019 | 12/31/2042 | R$7,435.54 | 6/1/2025 | Ativa | T2022-108 | Receita resultante do seccionamento do circuito LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA na SE FUTURA. Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 500 kV, circuito simples, entre o ponto de seccionamento da Linha de Transmissão 500 kV Sobradinho – Luiz Gonzaga e a Subestação Juazeiro da Bahia III, com 1 Km de extensão. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 500 kV FUTURA /U.SOBRADINHO BA | LT 500 kV FUTURA /U.SOBRADINHO C-1 BA | RB | FT LT 500 kV FUTURA /U.SOBRADINHO C-1 BA | 061/2001 | IPCA | RBNI | DSP 372/2024 | 3/18/2023 | 3/17/2058 | R$662,684.02 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito simples, Futura-U. Sobradinho C1, originado do seccionamento da Linha de Transmissão 500 kV Juazeiro III - U. Sobradinho C1 na Subestação seccionadora Futura, com 16,1 km de extensão. | |||
| AXIA Energia Nordeste | LT 500 kV GARANHUNS II /ANGELIM II PE | LT 500 kV GARANHUNS II /ANGELIM II C-1 PE | RB | FT LT 500 kV GARANHUNS II /ANGELIM II C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$710,207.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV GARANHUNS II /ANGELIM II PE | LT 500 kV GARANHUNS II /ANGELIM II C-1 PE | RB | FT LT 500 kV GARANHUNS II /ANGELIM II C-1 PE | 061/2001 | IPCA | RBNI | REA 5654/2016 | 9/19/2017 | 9/18/2050 | R$60,748.08 | 6/1/2025 | Ativa | T2015-069 | Substituir cabo para raios convencional por 12 km de cabo para raios com 36 fibras óticas, na LT 500 kV Garanhuns II - Angelim II C1. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 500 kV GARANHUNS II /ANGELIM II PE | LT 500 kV GARANHUNS II /ANGELIM II C-1 PE | RB | FT LT 500 kV GARANHUNS II /ANGELIM II C-1 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/30/2015 | 11/29/2048 | R$100,028.30 | 6/1/2025 | Ativa | Substituição de cabo Pára-raio e do sistema de aterramento por superação da corrente de curto circuito .Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV GARANHUNS II /ANGELIM II PE | LT 500 kV GARANHUNS II /ANGELIM II C-1 PE | RB | FT LT 500 kV GARANHUNS II /ANGELIM II C-1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,992,960.93 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV GASPAR 2 /BLUMENAU SC | LT 500 kV GASPAR 2 /BLUMENAU C-2 SC | RB | FT LT 500 kV GASPAR 2 /BLUMENAU C-2 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$57,274.85 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV GASPAR 2 /BLUMENAU SC | LT 500 kV GASPAR 2 /BLUMENAU C-2 SC | RB | FT LT 500 kV GASPAR 2 /BLUMENAU C-2 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$100,522.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV GASPAR 2 /BLUMENAU SC | LT 500 kV GASPAR 2 /BLUMENAU C-2 SC | RB | FT LT 500 kV GASPAR 2 /BLUMENAU C-2 SC | 057/2001 | IPCA | RBNI | DSP 540/2025 | 12/30/2024 | 12/29/2059 | R$850,549.38 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito duplo, Gaspar 2-Blumenau C2, originado do seccionamento da Linha de Transmissão 500 kV Curitiba - Blumenau C1 na Subestação seccionadora Gaspar 2, com 20,6 km de extensão. | |||
| AXIA Energia Sul | LT 500 kV GASPAR 2 /BLUMENAU SC | LT 500 kV GASPAR 2 /BLUMENAU C-1 SC | RB | FT LT 500 kV GASPAR 2 /BLUMENAU C-1 SC | 010/2005 | IGPM | RBL | CC 010/2005 | 9/17/2006 | 3/4/2035 | R$ 2,293,932.14 | 6/1/2025 | Ativa | Contrato de Concessão nº 010/2005 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | LT 500 kV GASPAR 2 /BLUMENAU SC | LT 500 kV GASPAR 2 /BLUMENAU C-1 SC | RB | FT LT 500 kV GASPAR 2 /BLUMENAU C-1 SC | 010/2005 | IGPM | RBNI | REA 485/2006 | 5/25/2008 | 9/15/2041 | R$141,012.77 | 6/1/2025 | Ativa | T2019-034-B | Receita resultante do seccionamento do circuito LT 500 kV BIGUACU /BLUMENAU C-1 SC na SE GASPAR 2. Instalar o circuito C1 da LT 525 kV BLUMENAU /BIGUACU SC originado do seccionamento do circuito LT 525 kV BLUMENAU /C.NOVOS C-2 SC na SE BIGUACU *(Receita revisada em 16/06/2010) * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Sul | LT 500 kV GASPAR 2 /BLUMENAU SC | LT 500 kV GASPAR 2 /BLUMENAU C-1 SC | RB | FT LT 500 kV GASPAR 2 /BLUMENAU C-1 SC | 010/2005 | IGPM | RBNI | REA 485/2006 | 5/25/2008 | 5/24/2041 | R$5,407.80 | 6/1/2025 | Ativa | T2019-034-B | Receita resultante do seccionamento do circuito LT 500 kV BIGUACU /BLUMENAU C-1 SC na SE GASPAR 2. Substituição de 30,7 km de cabos pára-raios da Linha de Transmissão, em 500 kV, Campos Novos – Blumenau, por cabos Dotterel. *(Receita revisada em 16/06/2010) * Receita Revisada no reajuste do ciclo 2016-2017 (RTP retroativa à Jun-14) *(Receita revisada em 06/07/2020) *(Receita revisada em 22/06/2022) | ||
| AXIA Energia Sul | LT 500 kV GASPAR 2 /BLUMENAU SC | LT 500 kV GASPAR 2 /BLUMENAU C-1 SC | RB | FT LT 500 kV GASPAR 2 /BLUMENAU C-1 SC | 010/2005 | IGPM | RBNI | DSP 543/2025 | 12/30/2024 | 12/29/2059 | R$416,167.53 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV Gaspar 2 -Blumenau C1 circuito duplo, para seccionamento da Linha de Transmissão 500 kV Biguaçu -Blumenau C1 na Subestação seccionadora Gaspar 2, com 8,7 km de extensão. | |||
| AXIA Energia Sul | LT 500 kV GASPAR 2 /CURITIBA SC/PR | LT 500 kV GASPAR 2 /CURITIBA C-1 SC/PR | RB | FT LT 500 kV GASPAR 2 /CURITIBA C-1 SC/PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 5,173,828.12 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV GASPAR 2 /CURITIBA SC/PR | LT 500 kV GASPAR 2 /CURITIBA C-1 SC/PR | RB | FT LT 500 kV GASPAR 2 /CURITIBA C-1 SC/PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 9,080,493.19 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV GASPAR 2 /CURITIBA SC/PR | LT 500 kV GASPAR 2 /CURITIBA C-1 SC/PR | RB | FT LT 500 kV GASPAR 2 /CURITIBA C-1 SC/PR | 057/2001 | IPCA | RBNI | DSP 540/2025 | 12/30/2024 | 12/29/2059 | R$850,549.38 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito duplo, Curitiba -Gaspar 2 C1, originado do seccionamento da Linha de Transmissão 500 kV Curitiba - Blumenau C1 na Subestação seccionadora Gaspar 2, com 20,6 km de extensão. | |||
| AXIA Energia | LT 500 kV GURUPI /MIRACEMA TO | LT 500 kV GURUPI /MIRACEMA C-1 TO | RB | FT LT 500 kV GURUPI /MIRACEMA C-1 TO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 10,885,933.98 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV GURUPI /MIRACEMA TO | LT 500 kV GURUPI /MIRACEMA C-1 TO | RB | FT LT 500 kV GURUPI /MIRACEMA C-1 TO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 41,773,434.96 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV GURUPI /MIRACEMA TO | LT 500 kV GURUPI /MIRACEMA C-1 TO | RB | FT LT 500 kV GURUPI /MIRACEMA C-1 TO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 44,783,358.50 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV GURUPI /MIRACEMA TO | LT 500 kV GURUPI /MIRACEMA C-1 TO | RB | FT LT 500 kV GURUPI /MIRACEMA C-1 TO | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/4/2021 | 3/8/2058 | R$413,236.25 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | LT 500 kV IBIUNA /BATEIAS SP/PR | LT 500 kV IBIUNA /BATEIAS C-2 SP/PR | RB | FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 69,560,743.05 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | LT 500 kV IBIUNA /BATEIAS SP/PR | LT 500 kV IBIUNA /BATEIAS C-1 SP/PR | RB | FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR | 034/2001 | IGPM | RBL | CC 034/2001 | 3/21/2003 | 5/9/2031 | R$ 69,560,743.05 | 6/1/2025 | Ativa | Contrato de Concessão nº 034/2001 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia | LT 500 kV IBIUNA /ITATIBA SP | LT 500 kV IBIUNA /ITATIBA C-1 SP | RB | FT LT 500 kV IBIUNA /ITATIBA C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,656,993.44 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV IBIUNA /ITATIBA SP | LT 500 kV IBIUNA /ITATIBA C-1 SP | RB | FT LT 500 kV IBIUNA /ITATIBA C-1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 14,033,263.31 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV IBIUNA /ITATIBA SP | LT 500 kV IBIUNA /ITATIBA C-1 SP | RB | FT LT 500 kV IBIUNA /ITATIBA C-1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 15,044,409.50 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV IBIUNA /ITATIBA SP | LT 500 kV IBIUNA /ITATIBA C-1 SP | RB | FT LT 500 kV IBIUNA /ITATIBA C-1 SP | 062/2001 | IPCA | RBNI | REA 6605/2017 | 6/18/2014 | 12/31/2042 | R$15,552.19 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de um trecho de linha de transmissão em 500 kV entre o ponto de seccionamento da linha de transmissão 500 kV Campinas - Ibiúna e a subestação seccionadora Itatiba, com 500 m de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | LT 500 kV IMPERATRIZ /COLINAS MA/TO | LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 18,192,539.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV IMPERATRIZ /COLINAS MA/TO | LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 39,494,615.73 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV IMPERATRIZ /COLINAS MA/TO | LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | RB | FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 37,879,168.29 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV IMPERATRIZ /MARABA MA/PA | LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 9,667,922.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV IMPERATRIZ /MARABA MA/PA | LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 20,988,323.47 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV IMPERATRIZ /MARABA MA/PA | LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 20,129,838.52 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV IMPERATRIZ /MARABA MA/PA | LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 9,680,667.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV IMPERATRIZ /MARABA MA/PA | LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 21,015,991.26 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV IMPERATRIZ /P.DUTRA MA | LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA | RB | FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 20,463,221.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV IMPERATRIZ /P.DUTRA MA | LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA | RB | FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 44,424,093.44 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV IMPERATRIZ /P.DUTRA MA | LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA | RB | FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 42,607,015.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV IMPERATRIZ /P.DUTRA MA | LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA | RB | FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 20,463,221.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV IMPERATRIZ /P.DUTRA MA | LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA | RB | FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 44,424,093.44 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV ITA /MACHADINHO SC | LT 500 kV ITA /MACHADINHO C-1 SC | RB | FT LT 500 kV ITA /MACHADINHO C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,049,228.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV ITA /MACHADINHO SC | LT 500 kV ITA /MACHADINHO C-1 SC | RB | FT LT 500 kV ITA /MACHADINHO C-1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 5,351,645.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV ITA /MACHADINHO SC | LT 500 kV ITA /MACHADINHO C-1 SC | RB | FT LT 500 kV ITA /MACHADINHO C-1 SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 4,532,937.17 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ITATIBA /CAMPINAS SP | LT 500 kV ITATIBA /CAMPINAS C-1 SP | RB | FT LT 500 kV ITATIBA /CAMPINAS C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,105,602.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ITATIBA /CAMPINAS SP | LT 500 kV ITATIBA /CAMPINAS C-1 SP | RB | FT LT 500 kV ITATIBA /CAMPINAS C-1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,242,614.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ITATIBA /CAMPINAS SP | LT 500 kV ITATIBA /CAMPINAS C-1 SP | RB | FT LT 500 kV ITATIBA /CAMPINAS C-1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 4,548,309.85 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ITATIBA /CAMPINAS SP | LT 500 kV ITATIBA /CAMPINAS C-1 SP | RB | FT LT 500 kV ITATIBA /CAMPINAS C-1 SP | 062/2001 | IPCA | RBNI | REA 6605/2017 | 6/18/2014 | 12/31/2042 | R$15,552.19 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de um trecho de linha de transmissão em 500 kV entre o ponto de seccionamento da linha de transmissão 500 kV Campinas - Ibiúna e a subestação seccionadora Itatiba, com 500 m de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | LT 500 kV ITUMBIARA /SAO SIMAO-SE MG | LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG | RB | FT LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 7,058,847.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ITUMBIARA /SAO SIMAO-SE MG | LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG | RB | FT LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 27,087,461.74 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV IVAIPORA /IVAIPORA PR | LT 500 kV IVAIPORA /IVAIPORA C-3 PR | RB | FT LT 500 kV IVAIPORA /IVAIPORA C-3 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$38,086.44 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV IVAIPORA /IVAIPORA PR | LT 500 kV IVAIPORA /IVAIPORA C-2 PR | RB | FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$38,086.44 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV IVAIPORA /IVAIPORA PR | LT 500 kV IVAIPORA /IVAIPORA C-2 PR | RB | FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$66,844.83 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV IVAIPORA /IVAIPORA PR | LT 500 kV IVAIPORA /IVAIPORA C-2 PR | RB | FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$56,618.73 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV IVAIPORA /IVAIPORA PR | LT 500 kV IVAIPORA /IVAIPORA C-1 PR | RB | FT LT 500 kV IVAIPORA /IVAIPORA C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$39,589.85 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV IVAIPORA /IVAIPORA PR | LT 500 kV IVAIPORA /IVAIPORA C-1 PR | RB | FT LT 500 kV IVAIPORA /IVAIPORA C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$69,483.44 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV IVAIPORA /LONDRINA ESU PR | LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR | RB | FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 4,699,126.39 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV IVAIPORA /LONDRINA ESU PR | LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR | RB | FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 8,247,352.69 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV IVAIPORA /LONDRINA ESU PR | LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR | RB | FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 6,985,651.59 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV IVAIPORA /S.SANTIAGO PR | LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR | RB | FT LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR | 004/2004 | IGPM | RBL | CC 004/2004 | 10/31/2005 | 2/18/2034 | R$ 32,652,463.71 | 6/1/2025 | Ativa | Contrato de Concessão nº 004/2004 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | LT 500 kV IVAIPORA /S.SANTIAGO PR | LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR | RB | FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 6,381,791.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV IVAIPORA /S.SANTIAGO PR | LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR | RB | FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 11,200,567.99 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| JANAPU | LT 500 kV JANAUBA 6 /PRESIDENTE JUSCELINO MG | LT 500 kV JANAUBA 6 /PRESIDENTE JUSCELINO C-1 MG | RB | FT LT 500 kV JANAUBA 6 /PRESIDENTE JUSCELINO C-1 MG | 009/2023 | IPCA | RBL | CC 009/2023 | R$ 69,132,860.69 | 6/1/2025 | Prevista | T2023-182 | |||||
| AXIA Energia Nordeste | LT 500 kV JARDIM /CAMACARI IV SE/BA | LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA | RB | FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 11,076,552.36 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV JARDIM /CAMACARI IV SE/BA | LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA | RB | FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 31,082,677.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV JARDIM /CAMACARI IV SE/BA | LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA | RB | FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 28,654,430.97 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV JARDIM /CAMACARI IV SE/BA | LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA | RB | FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA | 061/2001 | IPCA | RBNI | REA 10135/2021 | 8/15/2016 | 12/31/2042 | R$8,136.07 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 500 kV, circuito simples, entre o ponto de seccionamento da linha de transmissão 500 kV Jardim - Camaçari II e a subestação seccionadora Camaçari IV, com 0,5 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV JARDIM /CAMACARI IV SE/BA | LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA | RB | FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/14/2019 | 6/17/2056 | R$ 2,440,071.57 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV JEREMOABO /OLINDINA BA | LT 500 kV JEREMOABO /OLINDINA C-1 BA | RB | FT LT 500 kV JEREMOABO /OLINDINA C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 5,766,000.80 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV JEREMOABO /OLINDINA BA | LT 500 kV JEREMOABO /OLINDINA C-1 BA | RB | FT LT 500 kV JEREMOABO /OLINDINA C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 16,180,372.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV JEREMOABO /OLINDINA BA | LT 500 kV JEREMOABO /OLINDINA C-1 BA | RB | FT LT 500 kV JEREMOABO /OLINDINA C-1 BA | 061/2001 | IPCA | RBNI | DSP 568/2024 | 3/18/2023 | 3/17/2058 | R$57,658.77 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito simples, Jeremoabo-Olindina C1, originado do seccionamento da Linha de Transmissão 500 kV Paulo Afonso IV - Olindina C1 na Subestação seccionadora Jeremoabo, com 1,4 km de extensão. | |||
| AXIA Energia Nordeste | LT 500 kV JOAO CAMARA III /CEARA MIRIM II RN | LT 500 kV JOAO CAMARA III /CEARA MIRIM II C-1 RN | RB | FT LT 500 kV JOAO CAMARA III /CEARA MIRIM II C-1 RN | 008/2011 | IPCA | RBL | CC 008/2011 | 10/13/2014 | 10/13/2041 | R$ 4,790,547.23 | 6/1/2025 | Ativa | T2011-180-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | LT 500 kV JUAZEIRO III /FUTURA BA | LT 500 kV JUAZEIRO III /FUTURA C-1 BA | RB | FT LT 500 kV JUAZEIRO III /FUTURA C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,011,512.60 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV JUAZEIRO III /FUTURA BA | LT 500 kV JUAZEIRO III /FUTURA C-1 BA | RB | FT LT 500 kV JUAZEIRO III /FUTURA C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,838,475.28 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV JUAZEIRO III /FUTURA BA | LT 500 kV JUAZEIRO III /FUTURA C-1 BA | RB | FT LT 500 kV JUAZEIRO III /FUTURA C-1 BA | 061/2001 | IPCA | RBNI | REA 9689/2021 | 7/31/2019 | 12/31/2042 | R$8,747.70 | 6/1/2025 | Ativa | T2022-108 | Receita resultante do seccionamento do circuito LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA na SE FUTURA. Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 500 kV, circuito simples, entre o ponto de seccionamento da Linha de Transmissão 500 kV Sobradinho – Luiz Gonzaga e a Subestação Juazeiro da Bahia III, com 1 Km de extensão. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 500 kV JUAZEIRO III /FUTURA BA | LT 500 kV JUAZEIRO III /FUTURA C-1 BA | RB | FT LT 500 kV JUAZEIRO III /FUTURA C-1 BA | 061/2001 | IPCA | RBNI | DSP 372/2024 | 3/18/2023 | 3/17/2058 | R$642,103.77 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito simples, Juazeiro III -Futura C1, originado do seccionamento da Linha de Transmissão 500 kV Juazeiro III - U. Sobradinho C1 na Subestação seccionadora Futura, com 15,6 km de extensão. | |||
| AXIA Energia Nordeste | LT 500 kV JUAZEIRO III /U.SOBRADINHO BA | LT 500 kV JUAZEIRO III /U.SOBRADINHO C-2 BA | RB | FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-2 BA | 061/2001 | IPCA | RBNIA | REA 8328/2019 | R$85,114.14 | 6/1/2025 | Prevista | T2019-074 | Instalar trecho de 0,32 km de LT 500 kV JUAZEIRO III /U.SOBRADINHO C-2 BA originado do seccionamento do circuito LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA na SE JUAZEIRO III | 4T25 | |||
| AXIA Energia Nordeste | LT 500 kV JUAZEIRO III /U.SOBRADINHO BA | LT 500 kV JUAZEIRO III /U.SOBRADINHO C-2 BA | RB | FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-2 BA | 061/2001 | IPCA | RBNIA | REA 8328/2019 | R$ 1,238,504.74 | 6/1/2025 | Prevista | T2019-074 | Substituição do cabo pararaio e isoladores devido ao seccionamento do circuito LT 500 kV Sobradinho - Luiz Gonzaga C2 na SE Juazeiro III. | 4T25 | |||
| AXIA Energia Nordeste | LT 500 kV L.GONZAGA /US. L.GONZAGA PE | LT 500 kV L.GONZAGA /US. L.GONZAGA C-3 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$34,752.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV L.GONZAGA /US. L.GONZAGA PE | LT 500 kV L.GONZAGA /US. L.GONZAGA C-3 PE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$97,521.90 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV L.GONZAGA /US. L.GONZAGA PE | LT 500 kV L.GONZAGA /US. L.GONZAGA C-2 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$34,752.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV L.GONZAGA /US. L.GONZAGA PE | LT 500 kV L.GONZAGA /US. L.GONZAGA C-2 PE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$97,521.90 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV L.GONZAGA /US. L.GONZAGA PE | LT 500 kV L.GONZAGA /US. L.GONZAGA C-1 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$34,752.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV L.GONZAGA /US. L.GONZAGA PE | LT 500 kV L.GONZAGA /US. L.GONZAGA C-1 PE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$97,521.90 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | LT 500 kV MARABA /TUCURUI PA | LT 500 kV MARABA /TUCURUI C-2 PA | RB | FT LT 500 kV MARABA /TUCURUI C-2 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 11,788,854.76 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV MARABA /TUCURUI PA | LT 500 kV MARABA /TUCURUI C-2 PA | RB | FT LT 500 kV MARABA /TUCURUI C-2 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 25,592,704.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV MARABA /TUCURUI PA | LT 500 kV MARABA /TUCURUI C-2 PA | RB | FT LT 500 kV MARABA /TUCURUI C-2 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 24,545,886.81 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV MARABA /TUCURUI PA | LT 500 kV MARABA /TUCURUI C-2 PA | RB | FT LT 500 kV MARABA /TUCURUI C-2 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 8/29/2022 | 8/28/2037 | R$28,811.65 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | LT 500 kV MARABA /TUCURUI PA | LT 500 kV MARABA /TUCURUI C-1 PA | RB | FT LT 500 kV MARABA /TUCURUI C-1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 11,788,854.76 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV MARABA /TUCURUI PA | LT 500 kV MARABA /TUCURUI C-1 PA | RB | FT LT 500 kV MARABA /TUCURUI C-1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 25,592,704.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV MARIMBONDO /AGUA VERMELHA MG/SP | LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP | RB | FT LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 7,313,986.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV MARIMBONDO /AGUA VERMELHA MG/SP | LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP | RB | FT LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 28,066,526.62 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV MARIMBONDO /MARIMBONDO II MG | LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG | RB | FT LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$127,569.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV MARIMBONDO /MARIMBONDO II MG | LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG | RB | FT LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$489,532.44 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV MARIMBONDO /MARIMBONDO II MG | LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG | RB | FT LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG | 062/2001 | IPCA | RBNI | REA 8887/2020 | 8/28/2017 | 12/31/2042 | R$146,691.43 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de um trecho de LT em 500 kV entre o ponto de seccionamento das LTs 500 kV Marimbondo - Araraquara C1 e C2 e a subestação seccionadora Marimbondo II, com 6 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | LT 500 kV MARIMBONDO /MARIMBONDO II MG | LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG | RB | FT LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$85,046.36 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV MARIMBONDO /MARIMBONDO II MG | LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG | RB | FT LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$326,354.96 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV MARIMBONDO /MARIMBONDO II MG | LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG | RB | FT LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG | 062/2001 | IPCA | RBNI | REA 8887/2020 | 8/29/2017 | 12/31/2042 | R$146,691.43 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de um trecho de LT em 500 kV entre o ponto de seccionamento das LTs 500 kV Marimbondo - Araraquara C1 e C2 e a subestação seccionadora Marimbondo II, com 6 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS MG/SP | LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP | RB | FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 8,164,450.48 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS MG/SP | LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP | RB | FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 31,330,076.22 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS MG/SP | LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP | RB | FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP | 062/2001 | IPCA | RBNI | REA 8887/2020 | 8/28/2017 | 12/31/2042 | R$146,691.43 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de um trecho de LT em 500 kV entre o ponto de seccionamento das LTs 500 kV Marimbondo - Araraquara C1 e C2 e a subestação seccionadora Marimbondo II, com 6 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS MG/SP | LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP | RB | FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 8,164,450.48 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS MG/SP | LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP | RB | FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 31,330,076.23 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS MG/SP | LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP | RB | FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP | 062/2001 | IPCA | RBNI | REA 8887/2020 | 7/21/2017 | 12/31/2042 | R$146,691.43 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de um trecho de LT em 500 kV entre o ponto de seccionamento das LTs 500 kV Marimbondo - Araraquara C1 e C2 e a subestação seccionadora Marimbondo II, com 6 km de extensão. *(Receita revisada em 03/07/2024) | |||
| TMT | LT 500 kV MARIMBONDO II /ASSIS MG/SP | LT 500 kV MARIMBONDO II /ASSIS C-1 MG/SP | RB | FT LT 500 kV MARIMBONDO II /ASSIS C-1 MG/SP | 004/2013 | IPCA | RBL | CC 004/2013 | 12/21/2016 | 8/14/2043 | R$ 39,551,460.90 | 6/1/2025 | Ativa | T2013-098 | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Nordeste | LT 500 kV MESSIAS /SUAPE II AL/PE | LT 500 kV MESSIAS /SUAPE II C-1 AL/PE | RB | FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 7,101,032.55 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV MESSIAS /SUAPE II AL/PE | LT 500 kV MESSIAS /SUAPE II C-1 AL/PE | RB | FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 19,926,697.19 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV MESSIAS /SUAPE II AL/PE | LT 500 kV MESSIAS /SUAPE II C-1 AL/PE | RB | FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 18,369,980.17 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV MESSIAS /SUAPE II AL/PE | LT 500 kV MESSIAS /SUAPE II C-1 AL/PE | RB | FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE | 061/2001 | IPCA | RBNI | REA 10229/2021 | 5/21/2021 | 12/31/2042 | R$396,523.83 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 500 kV, circuito simples, Messias-Suape II, originada do seccionamento da linha de transmissão 500 kV Messias - Recife II C1 na subestação seccionadora Suape II, com 24 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV MILAGRES /QUIXADA CE | LT 500 kV MILAGRES /QUIXADA C-1 CE | RB | FT LT 500 kV MILAGRES /QUIXADA C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 11,940,665.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV MILAGRES /QUIXADA CE | LT 500 kV MILAGRES /QUIXADA C-1 CE | RB | FT LT 500 kV MILAGRES /QUIXADA C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 33,507,524.84 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV MILAGRES /QUIXADA CE | LT 500 kV MILAGRES /QUIXADA C-1 CE | RB | FT LT 500 kV MILAGRES /QUIXADA C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 30,889,843.95 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV MILAGRES /QUIXADA CE | LT 500 kV MILAGRES /QUIXADA C-1 CE | RB | FT LT 500 kV MILAGRES /QUIXADA C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/20/2020 | 1/19/2045 | R$43,914.97 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV MILAGRES II /MILAGRES CE | LT 500 kV MILAGRES II /MILAGRES C-1 CE | RB | FT LT 500 kV MILAGRES II /MILAGRES C-1 CE | 061/2001 | IPCA | RBNIA | REA 8771/2020 | R$190,238.75 | 6/1/2025 | Prevista | T2019-090 | Instalar o circuito LT 500 kV MILAGRES II /MILAGRES C-1 CE originado do seccionamento do circuito LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE na SE MILAGRES II | ||||
| AXIA Energia Norte | LT 500 kV MIRANDA II /P.DUTRA MA | LT 500 kV MIRANDA II /P.DUTRA C-2 MA | RB | FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 10,445,350.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV MIRANDA II /P.DUTRA MA | LT 500 kV MIRANDA II /P.DUTRA C-2 MA | RB | FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 22,676,058.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV MIRANDA II /P.DUTRA MA | LT 500 kV MIRANDA II /P.DUTRA C-2 MA | RB | FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 8/12/2021 | 8/15/2051 | R$76,392.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | LT 500 kV MIRANDA II /P.DUTRA MA | LT 500 kV MIRANDA II /P.DUTRA C-2 MA | RB | FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA | 058/2001 | IPCA | RBNI | DSP 622/2025 | 6/21/2024 | 6/20/2059 | R$63,091.54 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito simples, Presidente Dutra - Miranda II C2, originado do seccionamento da Linha de Transmissão 500 kV Presidente Dutra -São Luís II C2 na Subestação seccionadora Miranda II, com 1,6 km de extensão. | |||
| AXIA Energia Norte | LT 500 kV MIRANDA II /SANTO A. DOS LOPES MA | LT 500 kV MIRANDA II /SANTO A. DOS LOPES C-1 MA | RB | FT LT 500 kV MIRANDA II /SANTO A. DOS LOPES C-1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 7,540,618.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV MIRANDA II /SANTO A. DOS LOPES MA | LT 500 kV MIRANDA II /SANTO A. DOS LOPES C-1 MA | RB | FT LT 500 kV MIRANDA II /SANTO A. DOS LOPES C-1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 16,370,108.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV MIRANDA II /SANTO A. DOS LOPES MA | LT 500 kV MIRANDA II /SANTO A. DOS LOPES C-1 MA | RB | FT LT 500 kV MIRANDA II /SANTO A. DOS LOPES C-1 MA | 058/2001 | IPCA | RBNI | DSP 275/2023 | 4/28/2015 | 12/31/2042 | R$13,683.79 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito simples, Santo Antônio dos Lopes-Miranda II C1, originado do seccionamento da Linha de Transmissão 500 kV Presidente Dutra - Miranda II C1, e a Subestação seccionadora Santo Antônio dos Lopes, com 0,393 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | LT 500 kV MIRANDA II /SANTO A. DOS LOPES MA | LT 500 kV MIRANDA II /SANTO A. DOS LOPES C-1 MA | RB | FT LT 500 kV MIRANDA II /SANTO A. DOS LOPES C-1 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 8/12/2021 | 8/15/2051 | R$38,196.33 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | LT 500 kV MIRANDA II /SANTO A. DOS LOPES MA | LT 500 kV MIRANDA II /SANTO A. DOS LOPES C-1 MA | RB | FT LT 500 kV MIRANDA II /SANTO A. DOS LOPES C-1 MA | 058/2001 | IPCA | RBNI | DSP 622/2025 | 6/21/2024 | 6/20/2059 | R$51,261.87 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito simples, Santo Antônio dos Lopes - Miranda II C1, originado do seccionamento da Linha de Transmissão 500 kV Presidente Dutra -São Luís II C1 na Subestação seccionadora Miranda II (e, posteriormente, na SE Santo Antônio dos Lopes), com 1,3 km de extensão. | |||
| Nova Era Ceará | LT 500 kV MORADA NOVA /ACU III CE/RN | LT 500 kV MORADA NOVA /ACU III C-1 CE/RN | RB | FT LT 500 kV MORADA NOVA /ACU III C-1 CE/RN | 006/2024 | IPCA | RBL | CC 006/2024 | R$82,418.70 | 6/1/2025 | Prevista | T2024-195-C | - Seccionamento da LT 500 kV Açu III – Quixadá – C1 na subestação Morada Nova;- Remanejamento de banco de reator de linha de 150Mvar da LT 500kV Açu III – Quixadá C1 da SE Quixadá para a barra da SE Morada Nova, incluindo a instalação do respectivo Módulo de Conexão de Reator de Barra;- Unidade de reator monofásico reserva de 50Mvar em 500kV associado ao reator de barra da SE Morada Nova que será remanejado da SE Quixadá | ||||
| Nova Era Ceará | LT 500 kV MORADA NOVA /PACATUBA CE | LT 500 kV MORADA NOVA /PACATUBA C-1 CE | RB | FT LT 500 kV MORADA NOVA /PACATUBA C-1 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 32,895,886.38 | 6/1/2025 | Prevista | T2024-195-A | LT 500 kV Morada Nova - Pacatuba C1, CS, | ||||
| AXIA Energia | LT 500 kV NOVA IGUACU /GRAJAU RJ | LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ | RB | FT LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,660,324.41 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV NOVA IGUACU /GRAJAU RJ | LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ | RB | FT LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,371,291.04 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV NOVA IGUACU /GRAJAU RJ | LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ | RB | FT LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 6,830,365.06 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV NOVA IGUACU /GRAJAU RJ | LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ | RB | FT LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ | 062/2001 | IPCA | RBNI | DSP 836/2024 | 4/28/2023 | 4/27/2058 | R$43,015.48 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito simples, Grajaú -Nova Iguaçu C1, originado do seccionamento da Linha de Transmissão 500 kV Grajaú - Zona Oeste C1 na Subestação seccionadora Nova Iguaçu, com 0,2 km de extensão. | |||
| AXIA Energia | LT 500 kV NOVA IGUACU /SAO JOSE RJ | LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ | RB | FT LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$978,033.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV NOVA IGUACU /SAO JOSE RJ | LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ | RB | FT LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,753,082.05 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV NOVA IGUACU /SAO JOSE RJ | LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ | RB | FT LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 4,023,504.86 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV NOVA IGUACU /SAO JOSE RJ | LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ | RB | FT LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ | 062/2001 | IPCA | RBNI | DSP 836/2024 | 4/28/2023 | 4/27/2058 | R$8,427.53 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito duplo, Nova Iguaçu-São José C1, originado do seccionamento da Linha de Transmissão 500 kV Angra - São José C1 na Subestação seccionadora Nova Iguaçu, com 0,2 km de extensão. | |||
| AXIA Energia Nordeste | LT 500 kV OLINDINA /CAMACARI II BA | LT 500 kV OLINDINA /CAMACARI II C-2 BA | RB | FT LT 500 kV OLINDINA /CAMACARI II C-2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 6,545,088.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV OLINDINA /CAMACARI II BA | LT 500 kV OLINDINA /CAMACARI II C-2 BA | RB | FT LT 500 kV OLINDINA /CAMACARI II C-2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 18,366,624.62 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV OLINDINA /CAMACARI II BA | LT 500 kV OLINDINA /CAMACARI II C-1 BA | RB | FT LT 500 kV OLINDINA /CAMACARI II C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 6,558,455.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV OLINDINA /CAMACARI II BA | LT 500 kV OLINDINA /CAMACARI II C-1 BA | RB | FT LT 500 kV OLINDINA /CAMACARI II C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 18,404,133.05 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV OLINDINA /US. L.GONZAGA BA/PE | LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE | RB | FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 11,076,303.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV OLINDINA /US. L.GONZAGA BA/PE | LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE | RB | FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 31,081,980.13 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV P. AFONSO IV /ANGELIM II BA/PE | LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE | RB | FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 9,868,870.88 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV P. AFONSO IV /ANGELIM II BA/PE | LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE | RB | FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 27,693,719.22 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV P. AFONSO IV /ANGELIM II BA/PE | LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE | RB | FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/24/2019 | 11/27/2056 | R$25,744.64 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV P. AFONSO IV /JEREMOABO BA | LT 500 kV P. AFONSO IV /JEREMOABO C-1 BA | RB | FT LT 500 kV P. AFONSO IV /JEREMOABO C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,715,244.00 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV P. AFONSO IV /JEREMOABO BA | LT 500 kV P. AFONSO IV /JEREMOABO C-1 BA | RB | FT LT 500 kV P. AFONSO IV /JEREMOABO C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 10,425,602.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV P. AFONSO IV /JEREMOABO BA | LT 500 kV P. AFONSO IV /JEREMOABO C-1 BA | RB | FT LT 500 kV P. AFONSO IV /JEREMOABO C-1 BA | 061/2001 | IPCA | RBNI | DSP 568/2024 | 3/18/2023 | 3/17/2058 | R$65,578.64 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito simples, Paulo Afonso IV -Jeremoabo C1, originado do seccionamento da Linha de Transmissão 500 kV Paulo Afonso IV - Olindina C1 na Subestação seccionadora Jeremoabo, com 1,6 km de extensão. | |||
| AXIA Energia Nordeste | LT 500 kV P. AFONSO IV /US. L.GONZAGA BA/PE | LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE | RB | FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,666,346.60 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV P. AFONSO IV /US. L.GONZAGA BA/PE | LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE | RB | FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE | 061/2001 | IPCA | RBNI | REA 5745/2016 | 1/10/2020 | 7/26/2053 | R$294,148.33 | 6/1/2025 | Ativa | T2016-020 | Recapacitação do 1° circuito da LT 500 kV P. AFONSO IV /US. L.GONZAGA BA/PE, com extensão de 37,4 km, em circuito simples, para aumento da capacidade de curta duração de 2500 A para 3180 A. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 500 kV P. AFONSO IV /US. L.GONZAGA BA/PE | LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE | RB | FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,676,050.11 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV P. AFONSO IV /US. L.GONZAGA BA/PE | LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE | RB | FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/4/2021 | 1/8/2058 | R$28,249.33 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV P. AFONSO IV /USINA PA-IV BA | LT 500 kV P. AFONSO IV /USINA PA-IV C-6 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$34,752.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV P. AFONSO IV /USINA PA-IV BA | LT 500 kV P. AFONSO IV /USINA PA-IV C-6 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$97,521.90 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV P. AFONSO IV /USINA PA-IV BA | LT 500 kV P. AFONSO IV /USINA PA-IV C-5 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$34,752.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV P. AFONSO IV /USINA PA-IV BA | LT 500 kV P. AFONSO IV /USINA PA-IV C-5 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$97,521.90 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV P. AFONSO IV /USINA PA-IV BA | LT 500 kV P. AFONSO IV /USINA PA-IV C-4 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$34,752.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV P. AFONSO IV /USINA PA-IV BA | LT 500 kV P. AFONSO IV /USINA PA-IV C-4 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$97,521.90 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV P. AFONSO IV /USINA PA-IV BA | LT 500 kV P. AFONSO IV /USINA PA-IV C-3 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$34,752.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV P. AFONSO IV /USINA PA-IV BA | LT 500 kV P. AFONSO IV /USINA PA-IV C-3 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$97,521.90 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV P. AFONSO IV /USINA PA-IV BA | LT 500 kV P. AFONSO IV /USINA PA-IV C-2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$34,752.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV P. AFONSO IV /USINA PA-IV BA | LT 500 kV P. AFONSO IV /USINA PA-IV C-2 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$97,521.90 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV P. AFONSO IV /USINA PA-IV BA | LT 500 kV P. AFONSO IV /USINA PA-IV C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$34,752.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV P. AFONSO IV /USINA PA-IV BA | LT 500 kV P. AFONSO IV /USINA PA-IV C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$97,521.90 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV P. AFONSO IV /USINA XINGO BA/AL | LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL | RB | FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,397,044.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV P. AFONSO IV /USINA XINGO BA/AL | LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL | RB | FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,726,510.58 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV P. AFONSO IV /USINA XINGO BA/AL | LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL | RB | FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 6,201,020.91 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV P.DUTRA /B. ESPERANCA MA/PI | LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI | RB | FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 10,874,421.97 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV P.DUTRA /B. ESPERANCA MA/PI | LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI | RB | FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 23,607,540.82 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| Nova Era Ceará | LT 500 kV PACATUBA /FORTALEZA II CE | LT 500 kV PACATUBA /FORTALEZA II C-3 CE | RB | FT LT 500 kV PACATUBA /FORTALEZA II C-3 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$622,150.04 | 6/1/2025 | Prevista | T2024-195-I | - Seccionamento da LT 500 kV Quixadá – Fortaleza II – C1 na subestação Pacatuba.- Remanejamento de Banco de Reator de Linha de 150 Mvar (da LT 500 kV Quixadá – Fortaleza II C1) da SE Fortaleza II, composto por unidades monofásicas 3 x 50 Mvar, para a barra da SE Pacatuba e instalação do respectivo Módulo de Conexão de Reator de Barra de 500kV na SE Pacatuba. | ||||
| Nova Era Ceará | LT 500 kV PACATUBA /FORTALEZA II CE | LT 500 kV PACATUBA /FORTALEZA II C-2 CE | RB | FT LT 500 kV PACATUBA /FORTALEZA II C-2 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$803,908.27 | 6/1/2025 | Prevista | T2024-195-H | - Seccionamento da LT 500 kV Pecém II – Fortaleza II – C2 na subestação Pacatuba. | ||||
| AXIA Energia Nordeste | LT 500 kV PAU FERRO /RECIFE II PE | LT 500 kV PAU FERRO /RECIFE II C-1 PE | RB | FT LT 500 kV PAU FERRO /RECIFE II C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,320.61 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV PAU FERRO /RECIFE II PE | LT 500 kV PAU FERRO /RECIFE II C-1 PE | RB | FT LT 500 kV PAU FERRO /RECIFE II C-1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$764,177.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV PAU FERRO /RECIFE II PE | LT 500 kV PAU FERRO /RECIFE II C-1 PE | RB | FT LT 500 kV PAU FERRO /RECIFE II C-1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/16/2019 | 9/19/2056 | R$46,929.43 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV PECEM II /FORTALEZA II CE | LT 500 kV PECEM II /FORTALEZA II C-2 CE | RB | FT LT 500 kV PECEM II /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,958,549.55 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV PECEM II /FORTALEZA II CE | LT 500 kV PECEM II /FORTALEZA II C-2 CE | RB | FT LT 500 kV PECEM II /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 5,496,020.98 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV PECEM II /FORTALEZA II CE | LT 500 kV PECEM II /FORTALEZA II C-2 CE | RB | FT LT 500 kV PECEM II /FORTALEZA II C-2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 5,066,659.84 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV PECEM II /FORTALEZA II CE | LT 500 kV PECEM II /FORTALEZA II C-2 CE | RB | FT LT 500 kV PECEM II /FORTALEZA II C-2 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/2/2019 | 10/1/2047 | R$219,443.51 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| Nova Era Ceará | LT 500 kV PECEM II /PACATUBA CE | LT 500 kV PECEM II /PACATUBA C-2 CE | RB | FT LT 500 kV PECEM II /PACATUBA C-2 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$803,908.27 | 6/1/2025 | Prevista | T2024-195-H | - Seccionamento da LT 500 kV Pecém II – Fortaleza II – C2 na subestação Pacatuba. | ||||
| AXIA Energia | LT 500 kV POCOS CALDAS /ITAJUBA 3 MG | LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG | RB | FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 5,910,721.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV POCOS CALDAS /ITAJUBA 3 MG | LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG | RB | FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 22,681,669.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| NOVA ERA TERESINA | LT 500 kV QUIXADA /CRATEUS CE | LT 500 kV QUIXADA /CRATEUS C-1 CE | RB | FT LT 500 kV QUIXADA /CRATEUS C-1 CE | 004/2024 | IPCA | RBL | CC 004/2024 | R$ 44,010,831.66 | 6/1/2025 | Prevista | T2024-193-A | LT 500kV Quixadá – Crateús C1. | ||||
| AXIA Energia Nordeste | LT 500 kV QUIXADA /FORTALEZA II CE | LT 500 kV QUIXADA /FORTALEZA II C-1 CE | RB | FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 6,081,719.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV QUIXADA /FORTALEZA II CE | LT 500 kV QUIXADA /FORTALEZA II C-1 CE | RB | FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 8/27/2015 | 8/30/2052 | R$8,120.62 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE FUNDAÇÃO DA ESTRUTURA 10/1.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV QUIXADA /FORTALEZA II CE | LT 500 kV QUIXADA /FORTALEZA II C-1 CE | RB | FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 17,066,332.61 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV QUIXADA /FORTALEZA II CE | LT 500 kV QUIXADA /FORTALEZA II C-1 CE | RB | FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 15,733,073.51 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV QUIXADA /FORTALEZA II CE | LT 500 kV QUIXADA /FORTALEZA II C-1 CE | RB | FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/12/2022 | 11/15/2050 | R$187,645.09 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| Nova Era Ceará | LT 500 kV QUIXADA /MORADA NOVA CE | LT 500 kV QUIXADA /MORADA NOVA C-1 CE | RB | FT LT 500 kV QUIXADA /MORADA NOVA C-1 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$82,418.70 | 6/1/2025 | Prevista | T2024-195-C | - Seccionamento da LT 500 kV Açu III – Quixadá – C1 na subestação Morada Nova;- Remanejamento de banco de reator de linha de 150Mvar da LT 500kV Açu III – Quixadá C1 da SE Quixadá para a barra da SE Morada Nova, incluindo a instalação do respectivo Módulo de Conexão de Reator de Barra;- Unidade de reator monofásico reserva de 50Mvar em 500kV associado ao reator de barra da SE Morada Nova que será remanejado da SE Quixadá | ||||
| Nova Era Ceará | LT 500 kV QUIXADA /PACATUBA CE | LT 500 kV QUIXADA /PACATUBA C-1 CE | RB | FT LT 500 kV QUIXADA /PACATUBA C-1 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$622,150.04 | 6/1/2025 | Prevista | T2024-195-I | - Seccionamento da LT 500 kV Quixadá – Fortaleza II – C1 na subestação Pacatuba.- Remanejamento de Banco de Reator de Linha de 150 Mvar (da LT 500 kV Quixadá – Fortaleza II C1) da SE Fortaleza II, composto por unidades monofásicas 3 x 50 Mvar, para a barra da SE Pacatuba e instalação do respectivo Módulo de Conexão de Reator de Barra de 500kV na SE Pacatuba. | ||||
| AXIA Energia | LT 500 kV S.DA MESA /GURUPI GO/TO | LT 500 kV S.DA MESA /GURUPI C-1 GO/TO | RB | FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 10,885,933.98 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV S.DA MESA /GURUPI GO/TO | LT 500 kV S.DA MESA /GURUPI C-1 GO/TO | RB | FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 41,773,434.96 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV S.DA MESA /GURUPI GO/TO | LT 500 kV S.DA MESA /GURUPI C-1 GO/TO | RB | FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 44,783,358.50 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV S.DA MESA /SAMAMBAIA GO/DF | LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF | RB | FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 10,567,010.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV S.DA MESA /SAMAMBAIA GO/DF | LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF | RB | FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 40,549,603.86 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV S.DA MESA /SAMAMBAIA GO/DF | LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF | RB | FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 43,471,346.04 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV S.DA MESA /SAMAMBAIA GO/DF | LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF | RB | FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 10,588,271.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV S.DA MESA /SAMAMBAIA GO/DF | LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF | RB | FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 40,631,192.60 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV S.DA MESA /SAMAMBAIA GO/DF | LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF | RB | FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 43,558,813.54 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV S.JOAO PIAUI /B. ESPERANCA PI | LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI | RB | FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 10,403,527.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV S.JOAO PIAUI /B. ESPERANCA PI | LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI | RB | FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 29,194,056.16 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV S.JOAO PIAUI /B. ESPERANCA PI | LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI | RB | FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/14/2022 | 12/18/2059 | R$64,882.05 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | LT 500 kV S.SANTIAGO /ITA PR/SC | LT 500 kV S.SANTIAGO /ITA C-2 PR/SC | RB | FT LT 500 kV S.SANTIAGO /ITA C-2 PR/SC | 004/2012 | IPCA | RBL | CC 004/2012 | 2/4/2014 | 5/10/2042 | R$ 24,110,693.02 | 6/1/2025 | Ativa | T2012-074-C | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Sul | LT 500 kV S.SANTIAGO /ITA PR/SC | LT 500 kV S.SANTIAGO /ITA C-1 PR/SC | RB | FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 7,200,958.25 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV S.SANTIAGO /ITA PR/SC | LT 500 kV S.SANTIAGO /ITA C-1 PR/SC | RB | FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 12,638,273.03 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV S.SANTIAGO /ITA PR/SC | LT 500 kV S.SANTIAGO /ITA C-1 PR/SC | RB | FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 10,704,837.71 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV S.SANTIAGO /SEGREDO PR | LT 500 kV S.SANTIAGO /SEGREDO C-1 PR | RB | FT LT 500 kV S.SANTIAGO /SEGREDO C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,347,635.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV S.SANTIAGO /SEGREDO PR | LT 500 kV S.SANTIAGO /SEGREDO C-1 PR | RB | FT LT 500 kV S.SANTIAGO /SEGREDO C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,120,293.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV S.SANTIAGO /SEGREDO PR | LT 500 kV S.SANTIAGO /SEGREDO C-1 PR | RB | FT LT 500 kV S.SANTIAGO /SEGREDO C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 3,489,960.47 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 500 kV S.SANTIAGO /U.S.SANTIAGO PR | LT 500 kV S.SANTIAGO /U.S.SANTIAGO C-2 PR | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$33,075.07 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 500 kV S.SANTIAGO /U.S.SANTIAGO PR | LT 500 kV S.SANTIAGO /U.S.SANTIAGO C-2 PR | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$58,049.46 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 500 kV S.SANTIAGO /U.S.SANTIAGO PR | LT 500 kV S.SANTIAGO /U.S.SANTIAGO C-1 PR | DIT | 057/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$31,571.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Sul | LT 500 kV S.SANTIAGO /U.S.SANTIAGO PR | LT 500 kV S.SANTIAGO /U.S.SANTIAGO C-1 PR | DIT | 057/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$55,410.84 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | LT 500 kV SANTO A. DOS LOPES /P.DUTRA MA | LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA | RB | FT LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,822,952.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV SANTO A. DOS LOPES /P.DUTRA MA | LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA | RB | FT LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 6,128,415.23 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV SANTO A. DOS LOPES /P.DUTRA MA | LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA | RB | FT LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA | 058/2001 | IPCA | RBNI | DSP 275/2023 | 4/28/2015 | 12/31/2042 | R$12,550.11 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito simples, Presidente Dutra -Santo Antônio dos Lopes C1, originado do seccionamento da Linha de Transmissão 500 kV Presidente Dutra - Miranda II C1, e a Subestação seccionadora Santo Antônio dos Lopes, com 0,357 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | LT 500 kV SANTO A. DOS LOPES /P.DUTRA MA | LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA | RB | FT LT 500 kV SANTO A. DOS LOPES /P.DUTRA C-1 MA | 058/2001 | IPCA | RBNI | DSP 275/2023 | 4/28/2015 | 12/31/2042 | R$34,397.74 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de cabo OPGW instalado no trecho de Linha de Transmissão em 500 kV, circuito simples, entre a SE Presidente Dutra e o ponto de seccionamento da Linha de Transmissão 500 kV Presidente Dutra - Miranda II C1, e a Subestação seccionadora Santo Antônio dos Lopes, com total de 52,343 km. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | LT 500 kV SAO LUIS II /BACABEIRA MA | LT 500 kV SAO LUIS II /BACABEIRA C-2 MA | RB | FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,966,299.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV SAO LUIS II /BACABEIRA MA | LT 500 kV SAO LUIS II /BACABEIRA C-2 MA | RB | FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,268,685.24 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV SAO LUIS II /BACABEIRA MA | LT 500 kV SAO LUIS II /BACABEIRA C-2 MA | RB | FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA | 058/2001 | IPCA | RBNI | DSP 554/2023 | 9/9/2019 | 12/31/2042 | R$57,889.29 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito simples, Bacabeira-São Luís II C2, originado do seccionamento da Linha de Transmissão 500 kV Miranda II - São Luís II C2 na Subestação seccionadora Bacabeira, com 1,62 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | LT 500 kV SAO LUIS II /BACABEIRA MA | LT 500 kV SAO LUIS II /BACABEIRA C-1 MA | RB | FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,964,809.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV SAO LUIS II /BACABEIRA MA | LT 500 kV SAO LUIS II /BACABEIRA C-1 MA | RB | FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,265,450.78 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV SAO LUIS II /BACABEIRA MA | LT 500 kV SAO LUIS II /BACABEIRA C-1 MA | RB | FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA | 058/2001 | IPCA | RBNI | DSP 554/2023 | 9/26/2019 | 12/31/2042 | R$59,201.95 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito simples, Bacabeira-São Luís II C1, originado do seccionamento da Linha de Transmissão 500 kV Miranda II - São Luís II C1 na Subestação seccionadora Bacabeira, com 1,68 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV SOBRAL III /PECEM II CE | LT 500 kV SOBRAL III /PECEM II C-1 CE | RB | FT LT 500 kV SOBRAL III /PECEM II C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 7,433,585.80 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV SOBRAL III /PECEM II CE | LT 500 kV SOBRAL III /PECEM II C-1 CE | RB | FT LT 500 kV SOBRAL III /PECEM II C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 20,859,897.81 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV SOBRAL III /PECEM II CE | LT 500 kV SOBRAL III /PECEM II C-1 CE | RB | FT LT 500 kV SOBRAL III /PECEM II C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 19,230,277.12 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV SOBRAL III /PECEM II CE | LT 500 kV SOBRAL III /PECEM II C-1 CE | RB | FT LT 500 kV SOBRAL III /PECEM II C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/14/2018 | 2/14/2054 | R$893,408.25 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV SUAPE II /RECIFE II PE | LT 500 kV SUAPE II /RECIFE II C-2 PE | RB | FT LT 500 kV SUAPE II /RECIFE II C-2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$839,717.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV SUAPE II /RECIFE II PE | LT 500 kV SUAPE II /RECIFE II C-2 PE | RB | FT LT 500 kV SUAPE II /RECIFE II C-2 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,356,388.83 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV SUAPE II /RECIFE II PE | LT 500 kV SUAPE II /RECIFE II C-2 PE | RB | FT LT 500 kV SUAPE II /RECIFE II C-2 PE | 061/2001 | IPCA | RBNI | REA 8328/2019 | 11/29/2017 | 11/28/2050 | R$95,547.31 | 6/1/2025 | Ativa | T2019-073 | Receita resultante do seccionamento do circuito LT 500 kV ANGELIM II /RECIFE II C-2 PE na SE SUAPE II. Substituir cabo para raios convencional por 170 km de cabo para raios com 36 fibras óticas, na LT 500 kV Angelim - Recife II C2. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | LT 500 kV SUAPE II /RECIFE II PE | LT 500 kV SUAPE II /RECIFE II C-2 PE | RB | FT LT 500 kV SUAPE II /RECIFE II C-2 PE | 061/2001 | IPCA | RBNI | REA 8328/2019 | 5/26/2025 | 5/25/2053 | R$ 5,556,667.86 | 6/1/2025 | Ativa | T2019-073 | Instalar trecho de 24,87 km da LT 500 kV SUAPE II /RECIFE II C-2 PE originado do seccionamento do circuito LT 500 kV ANGELIM II /RECIFE II C-2 PE na SE SUAPE II | ||
| AXIA Energia Nordeste | LT 500 kV SUAPE II /RECIFE II PE | LT 500 kV SUAPE II /RECIFE II C-2 PE | RB | FT LT 500 kV SUAPE II /RECIFE II C-2 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/31/2023 | 2/4/2060 | R$48,398.78 | 6/1/2025 | Ativa | T2019-073 | Receita resultante do seccionamento do circuito LT 500 kV ANGELIM II /RECIFE II C-2 PE na SE SUAPE II. Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||
| AXIA Energia Nordeste | LT 500 kV SUAPE II /RECIFE II PE | LT 500 kV SUAPE II /RECIFE II C-2 PE | RB | FT LT 500 kV SUAPE II /RECIFE II C-2 PE | 061/2001 | IPCA | RBNI | REA 8328/2019 | 5/26/2025 | 5/25/2054 | R$21,441.22 | 6/1/2025 | Ativa | T2019-073 | Receita resultante do seccionamento do circuito LT 500 kV ANGELIM II /RECIFE II C-2 PE na SE SUAPE II. Troca de cabos para-raios e cadeias de isoladores em trechos de 6 km (a partir da SE Recife II) e de 3 km (a partir da SE Angelim II) em função do seccionamento da LT 500kV Angelim II - Recife II C2 na SE Suape II causar superação dos níveis de curto-circuito segundo estudos da Chesf. | ||
| AXIA Energia Nordeste | LT 500 kV SUAPE II /RECIFE II PE | LT 500 kV SUAPE II /RECIFE II C-1 PE | RB | FT LT 500 kV SUAPE II /RECIFE II C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$740,598.49 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV SUAPE II /RECIFE II PE | LT 500 kV SUAPE II /RECIFE II C-1 PE | RB | FT LT 500 kV SUAPE II /RECIFE II C-1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,078,244.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV SUAPE II /RECIFE II PE | LT 500 kV SUAPE II /RECIFE II C-1 PE | RB | FT LT 500 kV SUAPE II /RECIFE II C-1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,915,887.50 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV SUAPE II /RECIFE II PE | LT 500 kV SUAPE II /RECIFE II C-1 PE | RB | FT LT 500 kV SUAPE II /RECIFE II C-1 PE | 061/2001 | IPCA | RBNI | REA 10229/2021 | 5/21/2021 | 12/31/2042 | R$396,523.83 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 500 kV, circuito simples, Recife II-Suape II, originada do seccionamento da linha de transmissão 500 kV Messias - Recife II C1 na subestação seccionadora Suape II, com 24 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV TERESINA II /P.DUTRA PI/MA | LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA | RB | FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 9,254,015.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV TERESINA II /P.DUTRA PI/MA | LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA | RB | FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/15/2021 | 4/21/2058 | R$102,265.05 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV TERESINA II /P.DUTRA PI/MA | LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA | RB | FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 9,262,926.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV TERESINA II /P.DUTRA PI/MA | LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA | RB | FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/30/2015 | 9/29/2040 | R$562,727.94 | 6/1/2025 | Ativa | RECONSTRUÇÃO DA ESTRADA DE ACESSO.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV TERESINA II /P.DUTRA PI/MA | LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA | RB | FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 25,993,337.36 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV TERESINA II /P.DUTRA PI/MA | LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA | RB | FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 23,962,681.19 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV TERESINA II /P.DUTRA PI/MA | LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA | RB | FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/15/2021 | 7/26/2051 | R$438,041.63 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| NOVA ERA TERESINA | LT 500 kV TERESINA II /TERESINA IV PI | LT 500 kV TERESINA II /TERESINA IV C-2 PI | RB | FT LT 500 kV TERESINA II /TERESINA IV C-2 PI | 004/2024 | IPCA | RBL | CC 004/2024 | R$386,481.47 | 6/1/2025 | Prevista | T2024-193-A | -SE Cratéus -SE Teresina IV-SE Teresina II - Secc. LT 500kV Tianguá II - Teresina II C1-Remanejamento de reatores da LT 500kV Tianguá II – Teresina II C1 (05V9), conectados sem disjuntor na SE Teresina II, para conexão sem disjuntor na LT 500kV Tianguá II – Teresina IV C1, no terminal SE Teresina IV-Remanejamento de reator reserva da LT 500kV Tianguá II – Teresina II C1 (05V9), que passará a reserva do reator de linha da LT 500kV Tianguá II – Teresina IV C1, no terminal SE Teresina IV-SE Teresina II - Secc. LT 500kV Tianguá II - Teresina II C2-Remanejamento de reatores da LT 500kV Tianguá II – Teresina II C2 (05C7), conectados sem disjuntor no terminal SE Teresina II, para conexão sem disjuntor na LT 500kV Tianguá II – Teresina IV C2, no terminal SE Teresina IV -Remanejamento de reator reserva da LT 500kV Tianguá II – Teresina II C2 (05C7), que passará a ser disponibilizado como reserva na LT 500kV Tianguá II – Teresina IV C2, no terminal SE Teresina IV -Remanejamento d | ||||
| NOVA ERA TERESINA | LT 500 kV TERESINA II /TERESINA IV PI | LT 500 kV TERESINA II /TERESINA IV C-1 PI | RB | FT LT 500 kV TERESINA II /TERESINA IV C-1 PI | 004/2024 | IPCA | RBL | CC 004/2024 | R$386,481.47 | 6/1/2025 | Prevista | T2024-193-A | -SE Cratéus -SE Teresina IV-SE Teresina II - Secc. LT 500kV Tianguá II - Teresina II C1-Remanejamento de reatores da LT 500kV Tianguá II – Teresina II C1 (05V9), conectados sem disjuntor na SE Teresina II, para conexão sem disjuntor na LT 500kV Tianguá II – Teresina IV C1, no terminal SE Teresina IV-Remanejamento de reator reserva da LT 500kV Tianguá II – Teresina II C1 (05V9), que passará a reserva do reator de linha da LT 500kV Tianguá II – Teresina IV C1, no terminal SE Teresina IV-SE Teresina II - Secc. LT 500kV Tianguá II - Teresina II C2-Remanejamento de reatores da LT 500kV Tianguá II – Teresina II C2 (05C7), conectados sem disjuntor no terminal SE Teresina II, para conexão sem disjuntor na LT 500kV Tianguá II – Teresina IV C2, no terminal SE Teresina IV -Remanejamento de reator reserva da LT 500kV Tianguá II – Teresina II C2 (05C7), que passará a ser disponibilizado como reserva na LT 500kV Tianguá II – Teresina IV C2, no terminal SE Teresina IV -Remanejamento d | ||||
| AXIA Energia Nordeste | LT 500 kV TERESINA II /TIANGUA II PI/CE | LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE | RB | FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 10,541,647.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV TERESINA II /TIANGUA II PI/CE | LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE | RB | FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE | 061/2001 | IPCA | RBNI | REA 9688/2021 | 9/19/2019 | 12/31/2042 | R$269,053.03 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 500 kV, circuito simples, entre o ponto de seccionamento da Linha de Transmissão 500 kV Teresina II – Sobral III na Subestação Tianguá II, com 16,91 Km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV TERESINA II /TIANGUA II PI/CE | LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE | RB | FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/29/2019 | 6/1/2056 | R$497,574.14 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| NOVA ERA TERESINA | LT 500 kV TERESINA IV /TIANGUA II PI/CE | LT 500 kV TERESINA IV /TIANGUA II C-2 PI/CE | RB | FT LT 500 kV TERESINA IV /TIANGUA II C-2 PI/CE | 004/2024 | IPCA | RBL | CC 004/2024 | R$386,481.47 | 6/1/2025 | Prevista | T2024-193-A | -SE Cratéus -SE Teresina IV-SE Teresina II - Secc. LT 500kV Tianguá II - Teresina II C1-Remanejamento de reatores da LT 500kV Tianguá II – Teresina II C1 (05V9), conectados sem disjuntor na SE Teresina II, para conexão sem disjuntor na LT 500kV Tianguá II – Teresina IV C1, no terminal SE Teresina IV-Remanejamento de reator reserva da LT 500kV Tianguá II – Teresina II C1 (05V9), que passará a reserva do reator de linha da LT 500kV Tianguá II – Teresina IV C1, no terminal SE Teresina IV-SE Teresina II - Secc. LT 500kV Tianguá II - Teresina II C2-Remanejamento de reatores da LT 500kV Tianguá II – Teresina II C2 (05C7), conectados sem disjuntor no terminal SE Teresina II, para conexão sem disjuntor na LT 500kV Tianguá II – Teresina IV C2, no terminal SE Teresina IV -Remanejamento de reator reserva da LT 500kV Tianguá II – Teresina II C2 (05C7), que passará a ser disponibilizado como reserva na LT 500kV Tianguá II – Teresina IV C2, no terminal SE Teresina IV -Remanejamento d | ||||
| NOVA ERA TERESINA | LT 500 kV TERESINA IV /TIANGUA II PI/CE | LT 500 kV TERESINA IV /TIANGUA II C-1 PI/CE | RB | FT LT 500 kV TERESINA IV /TIANGUA II C-1 PI/CE | 004/2024 | IPCA | RBL | CC 004/2024 | R$386,481.47 | 6/1/2025 | Prevista | T2024-193-A | -SE Cratéus -SE Teresina IV-SE Teresina II - Secc. LT 500kV Tianguá II - Teresina II C1-Remanejamento de reatores da LT 500kV Tianguá II – Teresina II C1 (05V9), conectados sem disjuntor na SE Teresina II, para conexão sem disjuntor na LT 500kV Tianguá II – Teresina IV C1, no terminal SE Teresina IV-Remanejamento de reator reserva da LT 500kV Tianguá II – Teresina II C1 (05V9), que passará a reserva do reator de linha da LT 500kV Tianguá II – Teresina IV C1, no terminal SE Teresina IV-SE Teresina II - Secc. LT 500kV Tianguá II - Teresina II C2-Remanejamento de reatores da LT 500kV Tianguá II – Teresina II C2 (05C7), conectados sem disjuntor no terminal SE Teresina II, para conexão sem disjuntor na LT 500kV Tianguá II – Teresina IV C2, no terminal SE Teresina IV -Remanejamento de reator reserva da LT 500kV Tianguá II – Teresina II C2 (05C7), que passará a ser disponibilizado como reserva na LT 500kV Tianguá II – Teresina IV C2, no terminal SE Teresina IV -Remanejamento d | ||||
| AXIA Energia | LT 500 kV TERMINAL RIO /C. PAULISTA RJ/SP | LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP | RB | FT LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 5,995,768.32 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV TERMINAL RIO /C. PAULISTA RJ/SP | LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP | RB | FT LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP | 062/2001 | IPCA | RBNI | DSP 1387/2022 | 10/6/2020 | 12/31/2042 | R$32,761.11 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho com 1 km de extensão da Linha de Transmissão 500 kV Terminal Rio - Cachoeira Paulista C1, circuito simples, derivada do seccionamento da Linha de Transmissão 500 kV Adrianópolis - Cachoeira Paulista C1 na SE Terminal Rio. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | LT 500 kV TERMINAL RIO /RESENDE RJ | LT 500 kV TERMINAL RIO /RESENDE C-1 RJ | RB | FT LT 500 kV TERMINAL RIO /RESENDE C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,614,470.27 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV TERMINAL RIO /RESENDE RJ | LT 500 kV TERMINAL RIO /RESENDE C-1 RJ | RB | FT LT 500 kV TERMINAL RIO /RESENDE C-1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 13,870,085.83 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV TERMINAL RIO /RESENDE RJ | LT 500 kV TERMINAL RIO /RESENDE C-1 RJ | RB | FT LT 500 kV TERMINAL RIO /RESENDE C-1 RJ | 062/2001 | IPCA | RBNI | DSP 1387/2022 | 8/10/2020 | 12/31/2042 | R$32,761.11 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho com 1 km de extensão da Linha de Transmissão 500 kV Terminal Rio - Resende C1, circuito simples, derivada do seccionamento da Linha de Transmissão 500 kV Adrianópolis - Resende C1 na SE Terminal Rio. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | LT 500 kV TERMINAL RIO /RESENDE RJ | LT 500 kV TERMINAL RIO /RESENDE C-1 RJ | RB | FT LT 500 kV TERMINAL RIO /RESENDE C-1 RJ | 062/2001 | IPCA | RBNI | DSP 183/2023 | 12/23/2020 | 12/31/2042 | R$33,986.91 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito simples, Adrianópolis -Resende C1, originado do seccionamento da Linha de Transmissão 500 kV Adrianópolis - Cachoeira Paulista C2, e a Subestação seccionadora Resende, com 1 km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV TIANGUA II /SOBRAL III CE | LT 500 kV TIANGUA II /SOBRAL III C-1 CE | RB | FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 4,348,540.85 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV TIANGUA II /SOBRAL III CE | LT 500 kV TIANGUA II /SOBRAL III C-1 CE | RB | FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE | 061/2001 | IPCA | RBNI | REA 9688/2021 | 10/3/2019 | 12/31/2042 | R$267,302.85 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 500 kV, circuito simples, entre o ponto de seccionamento da Linha de Transmissão 500 kV Teresina II – Sobral III na Subestação Tianguá II, com 16,8 Km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV TIANGUA II /SOBRAL III CE | LT 500 kV TIANGUA II /SOBRAL III C-1 CE | RB | FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/1/2022 | 12/5/2059 | R$56,034.51 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | LT 500 kV TIJUCO PRETO /TAUBATE SP | LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP | RB | FT LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$663,361.60 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV TIJUCO PRETO /TAUBATE SP | LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP | RB | FT LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,545,568.69 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV TUCURUI /VILA DO CONDE PA | LT 500 kV TUCURUI /VILA DO CONDE C-1 PA | RB | FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 17,347,671.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV TUCURUI /VILA DO CONDE PA | LT 500 kV TUCURUI /VILA DO CONDE C-1 PA | RB | FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 37,660,471.89 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LT 500 kV TUCURUI /VILA DO CONDE PA | LT 500 kV TUCURUI /VILA DO CONDE C-1 PA | RB | FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 7/13/2022 | 10/3/2037 | R$34,581.86 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV U.SOBRADINHO /S.JOAO PIAUI BA/PI | LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI | RB | FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 9,401,046.30 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV U.SOBRADINHO /S.JOAO PIAUI BA/PI | LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI | RB | FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 26,380,924.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV U.SOBRADINHO /S.JOAO PIAUI BA/PI | LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI | RB | FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/14/2022 | 12/18/2059 | R$182,379.32 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV U.SOBRADINHO /SOBRADINHO BA | LT 500 kV U.SOBRADINHO /SOBRADINHO C-3 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$34,752.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV U.SOBRADINHO /SOBRADINHO BA | LT 500 kV U.SOBRADINHO /SOBRADINHO C-3 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$97,521.90 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV U.SOBRADINHO /SOBRADINHO BA | LT 500 kV U.SOBRADINHO /SOBRADINHO C-3 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$89,903.28 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV U.SOBRADINHO /SOBRADINHO BA | LT 500 kV U.SOBRADINHO /SOBRADINHO C-2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$34,752.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV U.SOBRADINHO /SOBRADINHO BA | LT 500 kV U.SOBRADINHO /SOBRADINHO C-2 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$97,521.90 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV U.SOBRADINHO /SOBRADINHO BA | LT 500 kV U.SOBRADINHO /SOBRADINHO C-2 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$89,903.28 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV U.SOBRADINHO /SOBRADINHO BA | LT 500 kV U.SOBRADINHO /SOBRADINHO C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$34,752.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV U.SOBRADINHO /SOBRADINHO BA | LT 500 kV U.SOBRADINHO /SOBRADINHO C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$97,521.90 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV U.SOBRADINHO /SOBRADINHO BA | LT 500 kV U.SOBRADINHO /SOBRADINHO C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$89,903.28 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV US. L.GONZAGA /GARANHUNS II PE | LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE | RB | FT LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 10,357,185.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV US. L.GONZAGA /GARANHUNS II PE | LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE | RB | FT LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/30/2015 | 11/29/2048 | R$ 1,730,199.73 | 6/1/2025 | Ativa | Substituição de cabo Pára-raio e do sistema de aterramento por superação da corrente de curto circuito.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV US. L.GONZAGA /GARANHUNS II PE | LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE | RB | FT LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 29,064,013.58 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV US. L.GONZAGA /JUAZEIRO III PE/BA | LT 500 kV US. L.GONZAGA /JUAZEIRO III C-2 PE/BA | RB | FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-2 PE/BA | 061/2001 | IPCA | RBNIA | REA 8328/2019 | R$85,114.14 | 6/1/2025 | Prevista | T2019-074 | Instalar trecho de 0,32 km da LT 500 kV US. L.GONZAGA /JUAZEIRO III C-2 PE/BA originado do seccionamento do circuito LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA na SE JUAZEIRO III | 4T25 | |||
| AXIA Energia Nordeste | LT 500 kV US. L.GONZAGA /JUAZEIRO III PE/BA | LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA | RB | FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 11,076,303.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV US. L.GONZAGA /JUAZEIRO III PE/BA | LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA | RB | FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 31,081,980.13 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV US. L.GONZAGA /JUAZEIRO III PE/BA | LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA | RB | FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA | 061/2001 | IPCA | RBNI | REA 9689/2021 | 7/31/2019 | 12/31/2042 | R$16,183.24 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de linha de transmissão em 500 kV, circuito simples, entre o ponto de seccionamento da Linha de Transmissão 500 kV Sobradinho – Luiz Gonzaga e a Subestação Juazeiro da Bahia III, com 1 Km de extensão. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV US. L.GONZAGA /JUAZEIRO III PE/BA | LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA | RB | FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/14/2020 | 12/18/2057 | R$116,967.93 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV US. L.GONZAGA /MILAGRES II PE/CE | LT 500 kV US. L.GONZAGA /MILAGRES II C-1 PE/CE | RB | FT LT 500 kV US. L.GONZAGA /MILAGRES II C-1 PE/CE | 061/2001 | IPCA | RBNIA | REA 8771/2020 | R$190,238.75 | 6/1/2025 | Prevista | T2019-090 | Instalar o circuito LT 500 kV US. L.GONZAGA /MILAGRES II C-1 PE/CE originado do seccionamento do circuito LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE na SE MILAGRES II | ||||
| AXIA Energia Nordeste | LT 500 kV US. L.GONZAGA /MILAGRES PE/CE | LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE | RB | FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 10,283,229.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV US. L.GONZAGA /MILAGRES PE/CE | LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE | RB | FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 28,856,480.35 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV US. L.GONZAGA /MILAGRES PE/CE | LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE | RB | FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 26,602,149.20 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV US. L.GONZAGA /MILAGRES PE/CE | LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE | RB | FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/16/2022 | 3/20/2054 | R$598,265.70 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV US. L.GONZAGA /U.SOBRADINHO PE/BA | LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA | RB | FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 14,079,292.09 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV US. L.GONZAGA /U.SOBRADINHO PE/BA | LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA | RB | FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 39,508,872.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV US. L.GONZAGA /U.SOBRADINHO PE/BA | LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA | RB | FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 36,422,353.32 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV US. L.GONZAGA /U.SOBRADINHO PE/BA | LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA | RB | FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/18/2019 | 11/21/2056 | R$211,773.07 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV USINA XINGO /JARDIM AL/SE | LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | RB | FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 7,119,844.55 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV USINA XINGO /JARDIM AL/SE | LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | RB | FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 19,979,486.83 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV USINA XINGO /JARDIM AL/SE | LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | RB | FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 18,418,645.76 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV USINA XINGO /JARDIM AL/SE | LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | RB | FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/23/2020 | 5/27/2057 | R$ 1,641,326.33 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV USINA XINGO /MESSIAS AL | LT 500 kV USINA XINGO /MESSIAS C-1 AL | RB | FT LT 500 kV USINA XINGO /MESSIAS C-1 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 9,757,484.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV USINA XINGO /MESSIAS AL | LT 500 kV USINA XINGO /MESSIAS C-1 AL | RB | FT LT 500 kV USINA XINGO /MESSIAS C-1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 27,381,149.03 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV USINA XINGO /MESSIAS AL | LT 500 kV USINA XINGO /MESSIAS C-1 AL | RB | FT LT 500 kV USINA XINGO /MESSIAS C-1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 25,242,073.98 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | LT 500 kV USINA XINGO /MESSIAS AL | LT 500 kV USINA XINGO /MESSIAS C-1 AL | RB | FT LT 500 kV USINA XINGO /MESSIAS C-1 AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/1/2022 | 11/30/2050 | R$20,038.24 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | LT 500 kV USINA XINGO /XINGO AL | LT 500 kV USINA XINGO /XINGO C-6 AL | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$39,556.56 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV USINA XINGO /XINGO AL | LT 500 kV USINA XINGO /XINGO C-6 AL | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$111,002.40 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV USINA XINGO /XINGO AL | LT 500 kV USINA XINGO /XINGO C-6 AL | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$102,330.65 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV USINA XINGO /XINGO AL | LT 500 kV USINA XINGO /XINGO C-5 AL | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$39,556.56 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV USINA XINGO /XINGO AL | LT 500 kV USINA XINGO /XINGO C-5 AL | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$111,002.40 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV USINA XINGO /XINGO AL | LT 500 kV USINA XINGO /XINGO C-5 AL | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$102,330.65 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV USINA XINGO /XINGO AL | LT 500 kV USINA XINGO /XINGO C-4 AL | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,501.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV USINA XINGO /XINGO AL | LT 500 kV USINA XINGO /XINGO C-4 AL | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$124,877.70 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV USINA XINGO /XINGO AL | LT 500 kV USINA XINGO /XINGO C-4 AL | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$115,121.98 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV USINA XINGO /XINGO AL | LT 500 kV USINA XINGO /XINGO C-3 AL | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,501.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV USINA XINGO /XINGO AL | LT 500 kV USINA XINGO /XINGO C-3 AL | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$124,877.70 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV USINA XINGO /XINGO AL | LT 500 kV USINA XINGO /XINGO C-3 AL | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$115,121.98 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV USINA XINGO /XINGO AL | LT 500 kV USINA XINGO /XINGO C-2 AL | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,501.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV USINA XINGO /XINGO AL | LT 500 kV USINA XINGO /XINGO C-2 AL | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$124,877.70 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV USINA XINGO /XINGO AL | LT 500 kV USINA XINGO /XINGO C-2 AL | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$115,121.98 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV USINA XINGO /XINGO AL | LT 500 kV USINA XINGO /XINGO C-1 AL | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,501.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV USINA XINGO /XINGO AL | LT 500 kV USINA XINGO /XINGO C-1 AL | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$124,877.70 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 500 kV USINA XINGO /XINGO AL | LT 500 kV USINA XINGO /XINGO C-1 AL | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$115,121.98 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| Nova Era Integração | LT 500 kV ZEBU III /OLINDINA AL/BA | LT 500 kV ZEBU III /OLINDINA C-1 AL/BA | RB | FT LT 500 kV ZEBU III /OLINDINA C-1 AL/BA | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 46,038,145.70 | 6/1/2025 | Prevista | T2024-197-A | LT 500 kV Zebu III - Olindina C1 | ||||
| AXIA Energia | LT 500 kV ZONA OESTE /NOVA IGUACU RJ | LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ | RB | FT LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,231,251.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ZONA OESTE /NOVA IGUACU RJ | LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ | RB | FT LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,724,777.62 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ZONA OESTE /NOVA IGUACU RJ | LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ | RB | FT LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 5,065,214.54 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 500 kV ZONA OESTE /NOVA IGUACU RJ | LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ | RB | FT LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ | 062/2001 | IPCA | RBNI | DSP 836/2024 | 4/28/2023 | 4/27/2058 | R$43,015.48 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito simples, Nova Iguaçu-Zona Oeste C1, originado do seccionamento da Linha de Transmissão 500 kV Grajaú - Zona Oeste C1 na Subestação seccionadora Nova Iguaçu, com 0,2 km de extensão. | |||
| AXIA Energia Sul | LT 525 kV C.NOVOS /NOVA STA RITA SC/RS | LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS | RB | FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS | 005/2006 | IPCA | RBL | CC 005/2006 | 4/27/2006 | 4/27/2036 | R$ 25,273,854.20 | 6/1/2025 | Ativa | Contrato de Concessão nº 005/2006 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | LT 525 kV CASCAVEL OEST /GUAIRA PR | LT 525 kV CASCAVEL OEST /GUAIRA C-1 PR | RB | FT LT 525 kV CASCAVEL OEST /GUAIRA C-1 PR | 057/2001 | IPCA | RBNI | REA 3232/2011 | 3/19/2013 | 3/18/2041 | R$111,046.34 | 6/1/2025 | Ativa | T2011-163 | Realocação de 0,6 km da LT 230 kV Cascavel Oeste - Guaíra (isolada em 525 kV) na chegada da SE Cascavel Oeste. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | LT 525 kV CASCAVEL OEST /GUAIRA PR | LT 525 kV CASCAVEL OEST /GUAIRA C-1 PR | RB | FT LT 525 kV CASCAVEL OEST /GUAIRA C-1 PR | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,993,023.07 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 525 kV CASCAVEL OEST /GUAIRA PR | LT 525 kV CASCAVEL OEST /GUAIRA C-1 PR | RB | FT LT 525 kV CASCAVEL OEST /GUAIRA C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,497,919.15 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 525 kV CASCAVEL OEST /GUAIRA PR | LT 525 kV CASCAVEL OEST /GUAIRA C-1 PR | RB | FT LT 525 kV CASCAVEL OEST /GUAIRA C-1 PR | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,962,798.53 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 525 kV CASCAVEL OEST /GUAIRA PR | LT 525 kV CASCAVEL OEST /GUAIRA C-1 PR | RB | FT LT 525 kV CASCAVEL OEST /GUAIRA C-1 PR | 057/2001 | IPCA | RBNI | REA 8795/2020 | 5/8/2023 | 5/8/2051 | R$776,699.94 | 6/1/2025 | Ativa | T2020-030 | Instalação de trecho com 1,67 km de LT 500 kV na chegada a SE Cascavel Oeste para o circuito LT Guaíra - Cascavel Oeste passar a operar em 500 kV. | ||
| AXIA Energia Sul | LT 525 kV CASCAVEL OEST /GUAIRA PR | LT 525 kV CASCAVEL OEST /GUAIRA C-1 PR | RB | FT LT 525 kV CASCAVEL OEST /GUAIRA C-1 PR | 057/2001 | IPCA | RBNI | REA 8795/2020 | 5/8/2023 | 5/8/2051 | R$572,060.42 | 6/1/2025 | Ativa | T2020-030 | Instalação de trecho com 1,23 km de LT 500 kV na chegada a SE Guaíra para o circuito LT Guaíra - Cascavel Oeste passar a operar em 525 kV. | ||
| AXIA Energia Sul | LT 525 kV CASCAVEL OEST /GUAIRA PR | LT 525 kV CASCAVEL OEST /GUAIRA C-1 PR | RB | FT LT 525 kV CASCAVEL OEST /GUAIRA C-1 PR | 057/2001 | IPCA | RBNI | REA 8795/2020 | 5/8/2023 | 5/8/2056 | R$298,446.94 | 6/1/2025 | Ativa | T2020-030 | Substituição de 22 km, contados da SE Cascavel Oeste, de cabo para-raios convencional 3/8" EAR por cabo CAA Dotterel na LT Guaíra - Cascavel Oeste em funçãode superação por nível de curto-circuito causado pela alteração do nível de tensão operativa da linha de 230 kV para 525 kV. | ||
| AXIA Energia Sul | LT 525 kV CAXIAS /GRAVATAI RS | LT 525 kV CAXIAS /GRAVATAI C-1 RS | RB | FT LT 525 kV CAXIAS /GRAVATAI C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 3,033,808.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 525 kV CAXIAS /GRAVATAI RS | LT 525 kV CAXIAS /GRAVATAI C-1 RS | RB | FT LT 525 kV CAXIAS /GRAVATAI C-1 RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 5,324,582.91 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 525 kV GRAVATAI /NOVA STA RITA RS | LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS | RB | FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,230,986.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 525 kV GRAVATAI /NOVA STA RITA RS | LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS | RB | FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,160,481.65 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 525 kV GRAVATAI /NOVA STA RITA RS | LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS | RB | FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,829,965.65 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 525 kV GUAIBA 3 /POVO NOVO RS | LT 525 kV GUAIBA 3 /POVO NOVO C-1 RS | RB | FT LT 525 kV GUAIBA 3 /POVO NOVO C-1 RS | 020/2012 | IPCA | RBL | CC 020/2012 | 3/24/2015 | 8/27/2042 | R$ 37,703,674.06 | 6/1/2025 | Ativa | T2012-080-B | Contrato de Concessão nº020/2012 - RB * Receita revisada no reajuste da RAP do ciclo 2018-2019. * Receita revisada em 07-11-2023 | ||
| AXIA Energia Sul | LT 525 kV GUAIBA 3 /POVO NOVO RS | LT 525 kV GUAIBA 3 /POVO NOVO C-1 RS | RB | FT LT 525 kV GUAIBA 3 /POVO NOVO C-1 RS | 020/2012 | IPCA | RBNI | DSP 682/2024 | 6/28/2023 | 6/27/2058 | R$116,522.47 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito duplo, Guaíba 3-Povo Novo C1, originado do seccionamento da Linha de Transmissão 500 kV Nova Santa Rita - Povo Novo C1, e a Subestação seccionadora Guaíba 3, com 3 km de extensão. | |||
| AXIA Energia Sul | LT 525 kV ITA /NOVA STA RITA SC/RS | LT 525 kV ITA /NOVA STA RITA C-2 SC/RS | RB | FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS | 004/2012 | IPCA | RBL | CC 004/2012 | 8/6/2014 | 5/10/2042 | R$ 38,704,008.56 | 6/1/2025 | Ativa | T2012-074-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Sul | LT 525 kV ITA /NOVA STA RITA SC/RS | LT 525 kV ITA /NOVA STA RITA C-1 SC/RS | RB | FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 12,135,233.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 525 kV ITA /NOVA STA RITA SC/RS | LT 525 kV ITA /NOVA STA RITA C-1 SC/RS | RB | FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 21,298,331.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 525 kV ITA /NOVA STA RITA SC/RS | LT 525 kV ITA /NOVA STA RITA C-1 SC/RS | RB | FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS | 057/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 18,040,058.40 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | LT 525 kV MARMELEIRO 2 /STA V.PALMAR RS | LT 525 kV MARMELEIRO 2 /STA V.PALMAR C-1 RS | RB | FT LT 525 kV MARMELEIRO 2 /STA V.PALMAR C-1 RS | 020/2012 | IPCA | RBL | CC 020/2012 | 12/19/2014 | 8/27/2042 | R$ 8,116,325.50 | 6/1/2025 | Ativa | T2012-080-A | Contrato de Concessão nº020/2012 - RB * Receita revisada no reajuste da RAP do ciclo 2018-2019. * Receita revisada em 07-11-2023 | ||
| AXIA Energia Sul | LT 525 kV NOVA STA RITA /GUAIBA 3 RS | LT 525 kV NOVA STA RITA /GUAIBA 3 C-1 RS | RB | FT LT 525 kV NOVA STA RITA /GUAIBA 3 C-1 RS | 020/2012 | IPCA | RBL | CC 020/2012 | 3/24/2015 | 8/27/2042 | R$ 6,155,701.89 | 6/1/2025 | Ativa | T2012-080-B | Contrato de Concessão nº020/2012 - RB * Receita revisada no reajuste da RAP do ciclo 2018-2019. * Receita revisada em 07-11-2023 | ||
| AXIA Energia Sul | LT 525 kV NOVA STA RITA /GUAIBA 3 RS | LT 525 kV NOVA STA RITA /GUAIBA 3 C-1 RS | RB | FT LT 525 kV NOVA STA RITA /GUAIBA 3 C-1 RS | 020/2012 | IPCA | RBNI | DSP 682/2024 | 6/28/2023 | 6/27/2058 | R$116,522.47 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de trecho de Linha de Transmissão em 500 kV, circuito duplo, Nova Santa Rita -Guaíba 3 C2, originado do seccionamento da Linha de Transmissão 500 kV Nova Santa Rita - Povo Novo C1, e a Subestação seccionadora Guaíba 3, com 3 km de extensão. | |||
| AXIA Energia Sul | LT 525 kV POVO NOVO /MARMELEIRO 2 RS | LT 525 kV POVO NOVO /MARMELEIRO 2 C-1 RS | RB | FT LT 525 kV POVO NOVO /MARMELEIRO 2 C-1 RS | 020/2012 | IPCA | RBL | CC 020/2012 | 12/19/2014 | 8/27/2042 | R$ 25,381,731.02 | 6/1/2025 | Ativa | T2012-080-A | Contrato de Concessão nº020/2012 - RB * Receita revisada no reajuste da RAP do ciclo 2018-2019. * Receita revisada em 07-11-2023 | ||
| AXIA Energia | LT 600 kV F.IGUACU 50HZ /IBIUNA PR/SP | LT 600 kV F.IGUACU 50HZ /IBIUNA C-4 PR/SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 28,168,315.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 600 kV F.IGUACU 50HZ /IBIUNA PR/SP | LT 600 kV F.IGUACU 50HZ /IBIUNA C-3 PR/SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 28,168,315.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 600 kV F.IGUACU 50HZ /IBIUNA PR/SP | LT 600 kV F.IGUACU 50HZ /IBIUNA C-2 PR/SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 27,206,470.38 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 600 kV F.IGUACU 50HZ /IBIUNA PR/SP | LT 600 kV F.IGUACU 50HZ /IBIUNA C-1 PR/SP | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 27,206,470.38 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 69 kV ABAIXADORA /MOXOTO BA | LT 69 kV ABAIXADORA /MOXOTO C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$68,568.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 69 kV ABAIXADORA /MULUNGU BA | LT 69 kV ABAIXADORA /MULUNGU C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,093.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 69 kV ABAIXADORA /ZEBU II BA/AL | LT 69 kV ABAIXADORA /ZEBU II C-1 BA/AL | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$90,509.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 69 kV CAMACARI II /CAMACARI II BA | LT 69 kV CAMACARI II /CAMACARI II C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$19,506.56 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 69 kV CATU /COTEGIPE BA | LT 69 kV CATU /COTEGIPE C-2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$423,764.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 69 kV CATU /COTEGIPE BA | LT 69 kV CATU /COTEGIPE C-2 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/17/2020 | 11/21/2057 | R$149,001.22 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | LT 69 kV CATU /COTEGIPE BA | LT 69 kV CATU /COTEGIPE C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$423,764.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 69 kV CATU /COTEGIPE BA | LT 69 kV CATU /COTEGIPE C-1 BA | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 5/18/2015 | 7/6/2048 | R$140,130.98 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DA ESTRUTURA 20/2.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | LT 69 kV CATU /COTEGIPE BA | LT 69 kV CATU /COTEGIPE C-1 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/25/2020 | 7/29/2057 | R$571,252.02 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | LT 69 kV MATATU /PITUACU BA | LT 69 kV MATATU /PITUACU C-2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$77,269.52 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 69 kV MATATU /PITUACU BA | LT 69 kV MATATU /PITUACU C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$78,313.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 69 kV MATATU /PITUACU BA | LT 69 kV MATATU /PITUACU C-1 BA | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 5/18/2015 | 8/30/2048 | R$292,953.29 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DA ESTRUTURA 3.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | LT 69 kV MATATU /PITUACU BA | LT 69 kV MATATU /PITUACU C-1 BA | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/23/2015 | 12/22/2040 | R$25,155.40 | 6/1/2025 | Ativa | Eliminação de erosões no entorno da estrutura 2.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | LT 69 kV PEDRA /JEQUIE BA | LT 69 kV PEDRA /JEQUIE C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$243,117.11 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 69 kV PEDRA /JEQUIE BA | LT 69 kV PEDRA /JEQUIE C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$682,227.69 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 69 kV PITUACU /COTEGIPE BA | LT 69 kV PITUACU /COTEGIPE C-2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$209,619.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 69 kV PITUACU /COTEGIPE BA | LT 69 kV PITUACU /COTEGIPE C-2 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/14/2021 | 4/18/2058 | R$468,845.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | LT 69 kV PITUACU /COTEGIPE BA | LT 69 kV PITUACU /COTEGIPE C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$211,534.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 69 kV PITUACU /COTEGIPE BA | LT 69 kV PITUACU /COTEGIPE C-1 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/5/2021 | 9/17/2051 | R$ 1,182,505.33 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | LT 69 kV RECIFE II /PIRAPAMA II PE | LT 69 kV RECIFE II /PIRAPAMA II C-1 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$90,509.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | LT 69 kV TUCURUI /TUCURUI VILA PA | LT 69 kV TUCURUI /TUCURUI VILA C-1 PA | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$38,420.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | LT 69 kV TUCURUI /TUCURUI VILA PA | LT 69 kV TUCURUI /TUCURUI VILA C-1 PA | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$83,408.37 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | LT 69 kV TUCURUI /TUCURUI VILA PA | LT 69 kV TUCURUI /TUCURUI VILA C-1 PA | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$79,996.72 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 69 kV ZEBU II /MOXOTO AL/BA | LT 69 kV ZEBU II /MOXOTO C-1 AL/BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$93,149.97 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | LT 69 kV ZEBU II /MOXOTO AL/BA | LT 69 kV ZEBU II /MOXOTO C-1 AL/BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$261,394.56 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 750 kV F.IGUACU 60HZ /IVAIPORA PR | LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 20,884,771.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 750 kV F.IGUACU 60HZ /IVAIPORA PR | LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 80,142,747.28 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 750 kV F.IGUACU 60HZ /IVAIPORA PR | LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 85,917,315.29 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 750 kV F.IGUACU 60HZ /IVAIPORA PR | LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 20,380,003.88 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 750 kV F.IGUACU 60HZ /IVAIPORA PR | LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 78,205,762.46 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 750 kV F.IGUACU 60HZ /IVAIPORA PR | LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 83,840,763.87 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 750 kV F.IGUACU 60HZ /IVAIPORA PR | LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2018 | 1/4/2056 | R$53,616.05 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | LT 750 kV F.IGUACU 60HZ /IVAIPORA PR | LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 20,316,907.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 750 kV F.IGUACU 60HZ /IVAIPORA PR | LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 77,963,639.35 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 750 kV F.IGUACU 60HZ /IVAIPORA PR | LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 83,581,194.94 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | LT 750 kV ITABERA /IVAIPORA SP/PR | LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 17,162,108.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 750 kV ITABERA /IVAIPORA SP/PR | LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 16,657,340.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 750 kV ITABERA /IVAIPORA SP/PR | LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 63,920,499.35 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 750 kV ITABERA /IVAIPORA SP/PR | LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 16,720,436.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 750 kV ITABERA /IVAIPORA SP/PR | LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 64,162,622.45 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 750 kV ITABERA /IVAIPORA SP/PR | LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | RB | FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 68,785,766.02 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 750 kV ITABERA /TIJUCO PRETO SP | LT 750 kV ITABERA /TIJUCO PRETO C-3 SP | RB | FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 19,685,948.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 750 kV ITABERA /TIJUCO PRETO SP | LT 750 kV ITABERA /TIJUCO PRETO C-3 SP | RB | FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/22/2018 | 6/26/2055 | R$23,592.07 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | LT 750 kV ITABERA /TIJUCO PRETO SP | LT 750 kV ITABERA /TIJUCO PRETO C-2 SP | RB | FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 19,181,180.12 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 750 kV ITABERA /TIJUCO PRETO SP | LT 750 kV ITABERA /TIJUCO PRETO C-2 SP | RB | FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 73,605,423.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 750 kV ITABERA /TIJUCO PRETO SP | LT 750 kV ITABERA /TIJUCO PRETO C-1 SP | RB | FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 19,244,276.11 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 750 kV ITABERA /TIJUCO PRETO SP | LT 750 kV ITABERA /TIJUCO PRETO C-1 SP | RB | FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 73,847,546.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | LT 750 kV ITABERA /TIJUCO PRETO SP | LT 750 kV ITABERA /TIJUCO PRETO C-1 SP | RB | FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 79,168,523.16 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | LUCAS RIO VERDE | TR 230/138 kV LUCAS RIO VERDE TRR1 MT | RBF | FT TR 230/138 kV LUCAS RIO VERDE TRR1 MT | 004/2011 | IPCA | RBL | CC 004/2011 | 6/28/2013 | 6/28/2041 | R$408,337.31 | 6/1/2025 | Ativa | T2011-108 | *(Considera adicional de RGR relativo à prorrogação do encargo, de acordo com a RH 1.150, de 07/06/2011) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Norte | LUCAS RIO VERDE | TR 230/138 kV LUCAS RIO VERDE TR3 MT | RBF | FT TR 230/138 kV LUCAS RIO VERDE TR3 MT | 004/2011 | IPCA | RBNIA | DSP 1174/2025 | R$ 2,574,236.31 | 6/1/2025 | Prevista | T2025-050 | Instalar, na SE LUCAS RIO VERDE, um banco de autotransformadores monofásicos TR3 230/138-13,8 KV - 3x25 MVA. | ||||
| AXIA Energia Norte | LUCAS RIO VERDE | TR 230/138 kV LUCAS RIO VERDE TR2 MT | RBF | FT TR 230/138 kV LUCAS RIO VERDE TR2 MT | 004/2011 | IPCA | RBNI | REA 9241/2020 | 7/14/2022 | 7/14/2055 | R$ 2,393,170.17 | 6/1/2025 | Ativa | T2020-057 | Instalar, na SE LUCAS RIO VERDE, um banco de autotransformadores monofásicos TR2 230/138-13,8 KV - 3x25 MVA. | ||
| AXIA Energia Norte | LUCAS RIO VERDE | TR 230/138 kV LUCAS RIO VERDE TR1 MT | RBF | FT TR 230/138 kV LUCAS RIO VERDE TR1 MT | 004/2011 | IPCA | RBL | CC 004/2011 | 6/28/2013 | 6/28/2041 | R$ 1,225,010.00 | 6/1/2025 | Ativa | T2011-108 | *(Considera adicional de RGR relativo à prorrogação do encargo, de acordo com a RH 1.150, de 07/06/2011) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Norte | LUCAS RIO VERDE | MG 230 kV LUCAS RIO VERDE MG2 MT | RB | FT MG 230 kV LUCAS RIO VERDE MG2 MT | 004/2011 | IPCA | RBL | CC 004/2011 | 6/28/2013 | 6/28/2041 | R$830,030.83 | 6/1/2025 | Ativa | T2011-108 | *(Considera adicional de RGR relativo à prorrogação do encargo, de acordo com a RH 1.150, de 07/06/2011) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Norte | LUCAS RIO VERDE | MG 230 kV LUCAS RIO VERDE MG2 MT | RB | FT MG 230 kV LUCAS RIO VERDE MG2 MT | 004/2011 | IPCA | RBNI | REA 9241/2020 | 7/14/2022 | 7/14/2053 | R$138,644.68 | 6/1/2025 | Ativa | T2020-057 | Complementação dos Módulos de Infraestrutura Geral, BD4, para a instalação do 2° Banco de Autotransformadores, 3x25 MVA, 230/138 kV, na SE Lucas do Rio Verde. | ||
| AXIA Energia Norte | LUCAS RIO VERDE | MG 230 kV LUCAS RIO VERDE MG2 MT | RB | FT MG 230 kV LUCAS RIO VERDE MG2 MT | 004/2011 | IPCA | RBNI | REA 9241/2020 | 7/14/2022 | 7/14/2053 | R$88,631.02 | 6/1/2025 | Ativa | T2020-057 | Complementação dos Módulos de Infraestrutura Geral 138kV, BD4, para a instalação do 2° Banco de Autotransformadores, 3x25 MVA, 230/138 kV, na SE Lucas do Rio Verde. | ||
| AXIA Energia Norte | LUCAS RIO VERDE | MG 230 kV LUCAS RIO VERDE MG2 MT | RB | FT MG 230 kV LUCAS RIO VERDE MG2 MT | 004/2011 | IPCA | RBNIA | DSP 1174/2025 | R$164,257.13 | 6/1/2025 | Prevista | T2025-050 | Modulo de Infraestrutura de Manobra em 230 kV na SE Lucas do Rio Verde | ||||
| AXIA Energia Norte | LUCAS RIO VERDE | MG 230 kV LUCAS RIO VERDE MG2 MT | RB | FT MG 230 kV LUCAS RIO VERDE MG2 MT | 004/2011 | IPCA | RBNIA | DSP 1174/2025 | R$105,068.36 | 6/1/2025 | Prevista | T2025-050 | Modulo de Infraestrutura de Manobra em 138 kV na SE Lucas do Rio Verde | ||||
| AXIA Energia Norte | LUCAS RIO VERDE | MC 230 kV TR 230/138 kV LUCAS RIO VERDE TR3 MT | RBF | FT TR 230/138 kV LUCAS RIO VERDE TR3 MT | 004/2011 | IPCA | RBNIA | DSP 1174/2025 | R$ 1,361,044.98 | 6/1/2025 | Prevista | T2025-050 | Instalar, na SE LUCAS RIO VERDE, um módulo de conexão, em 230 kV, para o banco de autotransformadores monofásicos TR3 230/138 kV - 75 MVA, arranjo Barra Dupla a Quatro Chaves. | ||||
| AXIA Energia Norte | LUCAS RIO VERDE | MC 230 kV TR 230/138 kV LUCAS RIO VERDE TR2 MT | RBF | FT TR 230/138 kV LUCAS RIO VERDE TR2 MT | 004/2011 | IPCA | RBNI | REA 9241/2020 | 7/14/2022 | 7/14/2050 | R$ 1,410,954.55 | 6/1/2025 | Ativa | T2020-057 | Instalar, na SE LUCAS RIO VERDE, um módulo de conexão, em 230 kV, para o banco de autotransformadores monofásicos TR2 230/138 kV - 75 MVA, arranjo Barra Dupla a Quatro Chaves. | ||
| AXIA Energia Norte | LUCAS RIO VERDE | MC 230 kV TR 230/138 kV LUCAS RIO VERDE TR1 MT | RBF | FT TR 230/138 kV LUCAS RIO VERDE TR1 MT | 004/2011 | IPCA | RBL | CC 004/2011 | 6/28/2013 | 6/28/2041 | R$383,606.12 | 6/1/2025 | Ativa | T2011-108 | *(Considera adicional de RGR relativo à prorrogação do encargo, de acordo com a RH 1.150, de 07/06/2011) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Norte | LUCAS RIO VERDE | MC 138 kV TR 230/138 kV LUCAS RIO VERDE TR3 MT | RBF | FT TR 230/138 kV LUCAS RIO VERDE TR3 MT | 004/2011 | IPCA | RBNIA | DSP 1174/2025 | R$ 1,021,755.84 | 6/1/2025 | Prevista | T2025-050 | Instalar, na SE LUCAS RIO VERDE, um módulo de conexão, em 138 kV, para o banco de autotransformadores monofásicos TR3 230/138 kV - 75 MVA, arranjo Barra Dupla a Quatro Chaves. | ||||
| AXIA Energia Norte | LUCAS RIO VERDE | MC 138 kV TR 230/138 kV LUCAS RIO VERDE TR2 MT | RBF | FT TR 230/138 kV LUCAS RIO VERDE TR2 MT | 004/2011 | IPCA | RBNI | REA 9241/2020 | 7/14/2022 | 7/14/2051 | R$ 1,538,607.19 | 6/1/2025 | Ativa | T2020-057 | Instalar, na SE LUCAS RIO VERDE, um módulo de conexão, em 138 kV, para o banco de autotransformadores monofásicos TR2 230/138 kV - 75 MVA, arranjo Barra Dupla a Quatro Chaves. | ||
| AXIA Energia Norte | LUCAS RIO VERDE | MC 138 kV TR 230/138 kV LUCAS RIO VERDE TR1 MT | RBF | FT TR 230/138 kV LUCAS RIO VERDE TR1 MT | 004/2011 | IPCA | RBL | CC 004/2011 | 6/28/2013 | 6/28/2041 | R$290,572.59 | 6/1/2025 | Ativa | T2011-108 | *(Considera adicional de RGR relativo à prorrogação do encargo, de acordo com a RH 1.150, de 07/06/2011) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Norte | LUCAS RIO VERDE | IB 230 kV MG 230 kV LUCAS RIO VERDE MG2 MT IB1 | RB | FT MG 230 kV LUCAS RIO VERDE MG2 MT | 004/2011 | IPCA | RBL | CC 004/2011 | 6/28/2013 | 6/28/2041 | R$290,050.61 | 6/1/2025 | Ativa | T2011-108 | *(Considera adicional de RGR relativo à prorrogação do encargo, de acordo com a RH 1.150, de 07/06/2011) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Norte | LUCAS RIO VERDE | IB 138 kV MG 230 kV LUCAS RIO VERDE MG2 MT IB1 | DIT | 004/2011 | IPCA | RPEC | CC 004/2011 | 6/28/2011 | 6/28/2041 | R$203,767.01 | 6/1/2025 | Ativa | T2011-108 | *(Considera adicional de RGR relativo à prorrogação do encargo, de acordo com a RH 1.150, de 07/06/2011) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | |||
| AXIA Energia Norte | LUCAS RIO VERDE | EL 138 kV LUCAS RIO VERDE DIST2 | DIT | 004/2011 | IPCA | RPEC | CC 004/2011 | 6/28/2011 | 6/28/2041 | R$395,064.21 | 6/1/2025 | Ativa | T2011-108 | *(Considera adicional de RGR relativo à prorrogação do encargo, de acordo com a RH 1.150, de 07/06/2011) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | |||
| AXIA Energia Norte | LUCAS RIO VERDE | EL 138 kV LUCAS RIO VERDE DIST1 | DIT | 004/2011 | IPCA | RPEC | CC 004/2011 | 6/28/2011 | 6/28/2041 | R$395,064.21 | 6/1/2025 | Ativa | T2011-108 | *(Considera adicional de RGR relativo à prorrogação do encargo, de acordo com a RH 1.150, de 07/06/2011) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | |||
| VSB | LUZIANIA | MG 500 kV LUZIANIA MG4 GO | RB | FT MG 500 kV LUZIANIA MG4 GO | 014/2013 | IPCA | RBL | CC 014/2013 | 2/19/2018 | 10/9/2043 | R$227,482.66 | 6/1/2025 | Ativa | T2014-015-A | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| VSB | LUZIANIA | EL 500 kV LUZIANIA LT 500 kV BRASILIA LESTE /LUZIANIA C-2 DF/GO | RB | FT LT 500 kV BRASILIA LESTE /LUZIANIA C-2 DF/GO | 014/2013 | IPCA | RBL | CC 014/2013 | 2/19/2018 | 10/9/2043 | R$ 1,137,114.09 | 6/1/2025 | Ativa | T2014-015-B | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| VSB | LUZIANIA | EL 500 kV LUZIANIA LT 500 kV BRASILIA LESTE /LUZIANIA C-1 DF/GO | RB | FT LT 500 kV BRASILIA LESTE /LUZIANIA C-1 DF/GO | 014/2013 | IPCA | RBL | CC 014/2013 | 2/19/2018 | 10/9/2043 | R$ 1,180,112.60 | 6/1/2025 | Ativa | T2014-015-A | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia | M. MORAES | TT 13,8/0,12 kV M. MORAES TR12 MG | RBF | FT TR 345/138 kV M. MORAES TR12 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | M. MORAES | TT 13,8/0,12 kV M. MORAES TR11 MG | RBF | FT TR 345/138 kV M. MORAES TR11 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | M. MORAES | TR 345/138 kV M. MORAES TRR2 MG | RBF | FT TR 345/138 kV M. MORAES TRR2 MG | 062/2001 | IPCA | RBNI | REA 1365/2008 | 3/27/2015 | 8/1/2047 | R$ 1,584,724.77 | 6/1/2025 | Ativa | T2000-198 | Instalar, na SE Mascarenhas de Moraes, uma fase reserva TRR2 345/138 kV - 133,3 MVA, para o banco de autotransformadores 345/138 kV de 400MVA *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | M. MORAES | TR 345/138 kV M. MORAES TR12 MG | RBF | FT TR 345/138 kV M. MORAES TR12 MG | 062/2001 | IPCA | RBNI | REA 1365/2008 | 7/23/2013 | 11/16/2043 | R$ 4,572,060.74 | 6/1/2025 | Ativa | T2000-198 | Instalar, na SE Mascarenhas de Moraes, um banco de autotransformadores TR12 345/138 kV de 400MVA *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | M. MORAES | TR 345/138 kV M. MORAES TR12 MG | RBF | FT TR 345/138 kV M. MORAES TR12 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/11/2015 | 7/15/2045 | R$18,317.59 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | M. MORAES | TR 345/138 kV M. MORAES TR11 MG | RBF | FT TR 345/138 kV M. MORAES TR11 MG | 062/2001 | IPCA | RBNI | REA 1938/2009 | 12/14/2018 | 2/15/2053 | R$ 5,333,547.08 | 6/1/2025 | Ativa | T2009-174 | Obra de Substituição Completa - Instalar na SE Mascarenhas de Moraes um banco de autotransformadores monofásicos 345/138/13,8 kV - 3x133,33 MVA, em substituição ao banco de autotransformadores monofásicos 345/138/13,8 kV - 3x50 MVA existente. RAP corrigida de modo a considerar a Receita autorizada total do equipamento novo. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | M. MORAES | TR 138/13,8 kV M. MORAES TR14 MG | DIT | 062/2001 | IPCA | RCDM | REA 10553/2021 | 3/20/2023 | 3/20/2058 | R$ 1,212,766.30 | 6/1/2025 | Ativa | T2021-050 | Obra de Substituição Completa - Substituição de um transformador trifásico 138/13,8 kV de 30 MVA da SE Mascarenhas de Moraes por motivo de final de vida útil. A receita associada a Portaria 579/2012 deverá ser cancelada após a entrada em operação comercial deste empreendimento. | |||
| AXIA Energia | M. MORAES | TR 138/13,8 kV M. MORAES TR12 MG | DIT | 062/2001 | IPCA | RCDM | REA 10553/2021 | 12/30/2022 | 12/7/2057 | R$ 1,090,357.99 | 6/1/2025 | Ativa | T2021-050 | Obra de Substituição Completa - Substituição de um transformador trifásico 138/13,8 kV de 30 MVA da SE Mascarenhas de Moraes por motivo de sinistro. A receita associada a Portaria 579/2012 deverá ser cancelada após a entrada em operação comercial deste empreendimento. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | M. MORAES | TR 138/13,8 kV M. MORAES TR12 MG | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 8/10/2014 | 1/20/2043 | R$357,356.79 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | M. MORAES | MG 345 kV M. MORAES MG1 MG | RB | FT MG 345 kV M. MORAES MG1 MG | 062/2001 | IPCA | RBNI | REA 1365/2008 | 11/30/2018 | 7/12/2051 | R$115,505.79 | 6/1/2025 | Ativa | T2000-198 | Acréscimo do módulo geral grande, em 138 kV, pela troca dos barramentos por superação de curto-circuito, arranjo barra principal e transferência. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | M. MORAES | MG 345 kV M. MORAES MG1 MG | RB | FT MG 345 kV M. MORAES MG1 MG | 062/2001 | IPCA | RBNI | REA 1938/2009 | 8/15/2014 | 2/25/2042 | R$232,024.22 | 6/1/2025 | Ativa | T2009-174 | Adequação na SE Mascarenhas de Moraes um arranjo de barramentos em 138 kV, de barra principal e transferência para barra dupla a quatro chaves. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | M. MORAES | MG 345 kV M. MORAES MG1 MG | RB | FT MG 345 kV M. MORAES MG1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$780,250.49 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | M. MORAES | MG 345 kV M. MORAES MG1 MG | RB | FT MG 345 kV M. MORAES MG1 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,994,115.44 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | M. MORAES | MG 345 kV M. MORAES MG1 MG | RB | FT MG 345 kV M. MORAES MG1 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 3,209,852.03 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | M. MORAES | MG 345 kV M. MORAES MG1 MG | RB | FT MG 345 kV M. MORAES MG1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/31/2017 | 3/27/2033 | R$3,664.84 | 6/1/2025 | Ativa | Substituição do Servidores e IHM do Sistema de Supervisão e Controle Local(SAGE) por obsolescência ou por atualização tecnológica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | M. MORAES | MG 345 kV M. MORAES MG1 MG | RB | FT MG 345 kV M. MORAES MG1 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/24/2015 | 4/20/2043 | R$615,414.42 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | M. MORAES | MC 345 kV TR 345/138 kV M. MORAES TR12 MG | RBF | FT TR 345/138 kV M. MORAES TR12 MG | 062/2001 | IPCA | RBNI | REA 1365/2008 | 7/23/2013 | 4/7/2041 | R$ 1,185,007.53 | 6/1/2025 | Ativa | T2000-198 | Instalar, na SE Mascarenhas de Moraes, um módulo de conexão de transfomador, em 345kV, arranjo barra disjuntor e meio, para o banco de autotransformadores 345/138 kV de 400MVA *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | M. MORAES | MC 345 kV TR 345/138 kV M. MORAES TR11 MG | RBF | FT TR 345/138 kV M. MORAES TR11 MG | 062/2001 | IPCA | RBNI | REA 1938/2009 | 12/14/2018 | 7/3/2050 | R$ 1,920,079.93 | 6/1/2025 | Ativa | T2009-174 | Instalar na SE Mascarenhas de Moraes um módulo de conexão de transformador em 345 kV, arranjo barra dupla com disjuntor e meio, para o banco de autotransformadores monofásicos 345/138/13,8 kV – 3x133,33 MVA; *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | M. MORAES | MC 138 kV TR 345/138 kV M. MORAES TR12 MG | RBF | FT TR 345/138 kV M. MORAES TR12 MG | 062/2001 | IPCA | RBNI | REA 1365/2008 | 7/23/2013 | 1/4/2041 | R$734,257.23 | 6/1/2025 | Ativa | T2000-198 | Instalar, na SE Mascarenhas de Moraes, um módulo de conexão de transfomador, em 138kV, arranjo principal e transferência, para o banco de autotransformadores 345/138 kV de 400MVA *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | M. MORAES | MC 138 kV TR 345/138 kV M. MORAES TR11 MG | RBF | FT TR 345/138 kV M. MORAES TR11 MG | 062/2001 | IPCA | RBNI | REA 1938/2009 | 12/14/2018 | 1/9/2050 | R$ 1,157,291.71 | 6/1/2025 | Ativa | T2009-174 | Instalar na SE Mascarenhas de Moraes, um módulo de conexão de transformador em 138 kV, arranjo barra dupla a quatro chaves, para o banco de autotransformadores monofásicos 345/138/13,8 kV – 3x133,33 MVA; *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | M. MORAES | MC 138 kV TR 138/13,8 kV M. MORAES TR12 MG TR12/TR14 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$107,257.42 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | M. MORAES | MC 138 kV TR 138/13,8 kV M. MORAES TR12 MG TR12/TR14 | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 5/20/2014 | 12/13/2034 | R$11,767.79 | 6/1/2025 | Ativa | Instalação de 3 Para-raios 138kV no vão do TR-12 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | M. MORAES | MC 138 kV TR 138/13,8 kV M. MORAES TR12 MG TR12/TR14 | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 11/26/2018 | 8/5/2050 | R$152,647.59 | 6/1/2025 | Ativa | Substituição de 01 disjuntor, 01 chave seccionadora e 03 TCs superados no vão de conexão Trafo 138/13,8 kV * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 – 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | M. MORAES | MC 138 kV TR 138/13,8 kV M. MORAES TR12 MG TR12/TR14 | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/20/2014 | 4/22/2046 | R$16,172.73 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | M. MORAES | MC 13,8 kV TT 13,8/0,12 kV M. MORAES TR12 MG | RBF | FT TR 345/138 kV M. MORAES TR12 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | M. MORAES | MC 13,8 kV TT 13,8/0,12 kV M. MORAES TR11 MG | RBF | FT TR 345/138 kV M. MORAES TR11 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | M. MORAES | MC 13,8 kV TR 138/13,8 kV M. MORAES TR14 MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$46,266.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | M. MORAES | MC 13,8 kV TR 138/13,8 kV M. MORAES TR12 MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,629.66 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | M. MORAES | MC 13,8 kV TR 138/13,8 kV M. MORAES TR12 MG | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$163,586.09 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | M. MORAES | MC 13,8 kV TR 138/13,8 kV M. MORAES TR12 MG | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$175,373.05 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | M. MORAES | IB 345 kV MG 345 kV M. MORAES MG1 MG IB5 | RB | FT MG 345 kV M. MORAES MG1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | M. MORAES | IB 345 kV MG 345 kV M. MORAES MG1 MG IB4 | RB | FT MG 345 kV M. MORAES MG1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | M. MORAES | IB 345 kV MG 345 kV M. MORAES MG1 MG IB3 | RB | FT MG 345 kV M. MORAES MG1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | M. MORAES | IB 345 kV MG 345 kV M. MORAES MG1 MG IB3 | RB | FT MG 345 kV M. MORAES MG1 MG | 062/2001 | IPCA | RBNI | REA 2040/2009 | 4/6/2015 | 9/28/2042 | R$76,255.31 | 6/1/2025 | Ativa | Substituição de 3 TC do IB 345 kV correspondente ao vão DJM da LT M.Moraes-Estreito. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | M. MORAES | IB 345 kV MG 345 kV M. MORAES MG1 MG IB3 | RB | FT MG 345 kV M. MORAES MG1 MG | 062/2001 | IPCA | RBNI | REA 1523/2008 | 9/29/2016 | 11/21/2047 | R$258,537.98 | 6/1/2025 | Ativa | Subst. 1 disjuntor e 02 chaves seccionadoras superadas no vão de interligação de barra (DJM). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | M. MORAES | IB 345 kV MG 345 kV M. MORAES MG1 MG IB2 | RB | FT MG 345 kV M. MORAES MG1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | M. MORAES | IB 345 kV MG 345 kV M. MORAES MG1 MG IB2 | RB | FT MG 345 kV M. MORAES MG1 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$928,957.53 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | M. MORAES | IB 345 kV MG 345 kV M. MORAES MG1 MG IB2 | RB | FT MG 345 kV M. MORAES MG1 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$995,892.20 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | M. MORAES | IB 345 kV MG 345 kV M. MORAES MG1 MG IB2 | RB | FT MG 345 kV M. MORAES MG1 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/26/2019 | 4/24/2051 | R$342,065.35 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | M. MORAES | IB 345 kV MG 345 kV M. MORAES MG1 MG IB1 | RB | FT MG 345 kV M. MORAES MG1 MG | 062/2001 | IPCA | RBNI | REA 1938/2009 | 12/14/2018 | 1/8/2051 | R$ 1,838,067.93 | 6/1/2025 | Ativa | T2009-174 | Instalar na SE Mascarenhas de Moraes, um módulo de interligação de barras em 345 kV, arranjo barra dupla com disjuntor e meio; *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | M. MORAES | IB 345 kV MG 345 kV M. MORAES MG1 MG IB1 | RB | FT MG 345 kV M. MORAES MG1 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2018 | 12/4/2049 | R$22,114.06 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | M. MORAES | IB 138 kV MG 345 kV M. MORAES MG1 MG IB1 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$82,866.56 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | M. MORAES | IB 138 kV MG 345 kV M. MORAES MG1 MG IB1 | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 5/5/2013 | 12/1/2040 | R$197,142.76 | 6/1/2025 | Ativa | Substituição de 1 disjuntor, 1 chave seccionadora e 3 TC de 138 kV superados no vão de Amarre. No cálculo da RAP foi considerada a data informada pela transmissora (05/05/2013). RAP cadastrada como prevista em função da ausência de Termo de Liberação. CLASSIFICADA COMO ATIVA NO CICLO 16/17 CONFORME TL *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | M. MORAES | IB 138 kV MG 345 kV M. MORAES MG1 MG IB1 | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/10/2014 | 6/9/2042 | R$271,611.82 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | M. MORAES | EL 345 kV M. MORAES LT 345 kV FURNAS /M. MORAES C-1 MG | RB | FT LT 345 kV FURNAS /M. MORAES C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,201.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | M. MORAES | EL 345 kV M. MORAES LT 345 kV FURNAS /M. MORAES C-1 MG | RB | FT LT 345 kV FURNAS /M. MORAES C-1 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/3/2019 | 1/6/2050 | R$388,961.23 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | M. MORAES | EL 345 kV M. MORAES LT 345 kV ESTREITO /M. MORAES C-1 MG | RB | FT LT 345 kV ESTREITO /M. MORAES C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,201.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | M. MORAES | EL 345 kV M. MORAES LT 345 kV ESTREITO /M. MORAES C-1 MG | RB | FT LT 345 kV ESTREITO /M. MORAES C-1 MG | 062/2001 | IPCA | RBNI | REA 1523/2008 | 4/6/2015 | 11/3/2044 | R$253,295.38 | 6/1/2025 | Ativa | Substituição de 1 disjuntor e 2 seccionadoras superados no vão de conexão de linha para SE Estreito. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | M. MORAES | EL 345 kV M. MORAES LT 345 kV ESTREITO /M. MORAES C-1 MG | RB | FT LT 345 kV ESTREITO /M. MORAES C-1 MG | 062/2001 | IPCA | RBNI | REA 2040/2009 | 4/6/2015 | 9/28/2042 | R$66,390.93 | 6/1/2025 | Ativa | Substituição de 3 TC da LT 345 kV M.Moraes-Estreito. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | M. MORAES | EL 345 kV M. MORAES LT 345 kV ESTREITO /M. MORAES C-1 MG | RB | FT LT 345 kV ESTREITO /M. MORAES C-1 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/3/2016 | 7/5/2044 | R$132,100.11 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-2 SP/MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$159,930.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-2 SP/MG | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 2/24/2014 | 2/23/2042 | R$250,869.35 | 6/1/2025 | Ativa | Substituição de disjuntor, 3 chaves seccionadoras e 3 TC 138 kV superados no vão para M. Cipó II (CEVASA). No cálculo da RAP foi considerada a data informada pela transmissora (24/02/2014). RAP cadastrada como prevista em função da ausência de Termo de Liberação. CLASSIFICADA COMO ATIVA NO CICLO 16/17 CONFORME TL *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-2 SP/MG | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/2/2016 | 11/27/2042 | R$65,274.59 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-1 SP/MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$159,930.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-1 SP/MG | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 4/27/2014 | 9/30/2043 | R$116,693.00 | 6/1/2025 | Ativa | Substituição de disjuntor superado Morro do Cipó I INCLUÍDA NO CICLO 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-1 SP/MG | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 4/27/2014 | 5/12/2041 | R$33,669.50 | 6/1/2025 | Ativa | Substituição de seccionadoras superadas Morro do Cipó I INCLUÍDA NO CICLO 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-1 SP/MG | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 4/27/2014 | 7/10/2041 | R$52,370.98 | 6/1/2025 | Ativa | Substituição de seccionadoras superadas Morro do Cipó I s / LTC INCLUÍDA NO CICLO 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-1 SP/MG | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 4/27/2014 | 4/6/2041 | R$11,591.36 | 6/1/2025 | Ativa | Substituição de transformadores de corrente Morro do Cipó I INCLUÍDA NO CICLO 16/17 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-1 SP/MG | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/10/2014 | 6/9/2042 | R$276,109.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES LT 138 kV JAGUARA-US /M. MORAES C-1 MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$159,930.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES LT 138 kV JAGUARA-US /M. MORAES C-1 MG | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 10/8/2013 | 6/4/2041 | R$139,072.32 | 6/1/2025 | Ativa | Substituição de 1 disjuntor, 3 chaves seccionadoras e 3 TCs superados no vão da LT Jaguara 138 kV. No cálculo da RAP foi considerada a data informada pela transmissora (08/10/2013). RAP cadastrada como prevista em função da ausência de Termo de Liberação.CLASSIFICADA COMO ATIVA NO CICLO 16/17 CONFORME TL *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES LT 138 kV JAGUARA-US /M. MORAES C-1 MG | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/24/2014 | 6/4/2042 | R$303,993.98 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-2 SP/MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$159,930.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-2 SP/MG | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 7/22/2013 | 11/16/2039 | R$120,188.16 | 6/1/2025 | Ativa | Substituição de seccionadoras e TC superados EL 138 kV para Franca II. No cálculo da RAP foi considerada a data informada pela transmissora (22/07/2013). RAP cadastrada como prevista em função da ausência de Termo de Liberação.CLASSIFICADA COMO ATIVA NO CICLO 16/17 CONFORME TL *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-2 SP/MG | DIT | 062/2001 | IPCA | RMEL | REN 643/2014 | 10/24/2014 | 10/23/2035 | R$12,051.00 | 6/1/2025 | Ativa | Instalação de 3 Para-raios 138kV no vão de Franca 2 * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-2 SP/MG | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 9/1/2015 | 3/14/2045 | R$454,866.85 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-1 SP/MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$159,930.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-1 SP/MG | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 5/5/2013 | 6/30/2039 | R$130,133.17 | 6/1/2025 | Ativa | Substituição de seccionadoras e TC superados na EL 138 kV da LT para Franca I. No cálculo da RAP foi considerada a data informada pela transmissora (05/05/2013). RAP cadastrada como prevista em função da ausência de Termo de Liberação.CLASSIFICADA COMO ATIVA NO CICLO 16/17 CONFORME TL *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-1 SP/MG | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$613,715.33 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-1 SP/MG | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$657,935.69 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-1 SP/MG | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/24/2014 | 6/4/2042 | R$303,994.00 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES LT 138 kV CASSIA /M. MORAES C-1 MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$159,930.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES LT 138 kV CASSIA /M. MORAES C-1 MG | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 12/17/2013 | 10/13/2041 | R$248,933.88 | 6/1/2025 | Ativa | Substituição de disjuntor, 3 chaves seccionadoras e 3 TC 138 kV superados na EL para Cássia II. No cálculo da RAP foi considerada a data informada pela transmissora (17/12/2013). RAP cadastrada como prevista em função da ausência de Termo de Liberação.CLASSIFICADA COMO ATIVA NO CICLO 16/17 CONFORME TL *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES LT 138 kV CASSIA /M. MORAES C-1 MG | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/27/2014 | 4/24/2042 | R$692,074.29 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES FRANCA 3 | DIT | 062/2001 | IPCA | RCDM | REA 1814/2009 | 9/30/2012 | 6/3/2039 | R$646,051.04 | 6/1/2025 | Ativa | Instalação de Módulo de Entrada de Linha para a Franca 3 (CPFL) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES FRANCA 3 | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2018 | 12/4/2049 | R$3,239.90 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES CASSIA C1 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$159,930.94 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | M. MORAES | EL 138 kV M. MORAES CASSIA C1 | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 8/10/2014 | 8/12/2044 | R$16,932.40 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | M. MORAES | EL 13,8 kV M. MORAES DIST2 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$47,677.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | M. MORAES | EL 13,8 kV M. MORAES DIST1 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$47,677.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | M. MORAES | EL 13,8 kV M. MORAES DIST1 | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$182,957.61 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | M. MORAES | EL 13,8 kV M. MORAES DIST1 | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$196,140.35 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | MACAE MERCHAN | RTB 345 kV 60 Mvar MACAE MERCHAN RT1 RJ | RB | FT RTB 345 kV 60 Mvar MACAE MERCHAN RT1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$473,185.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MACAE MERCHAN | RTB 345 kV 20 Mvar MACAE MERCHAN RTR1 RJ | RB | FT RTB 345 kV 20 Mvar MACAE MERCHAN RTR1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$157,728.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MACAE MERCHAN | MG 345 kV MACAE MERCHAN MG1 RJ | RB | FT MG 345 kV MACAE MERCHAN MG1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$794,175.80 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MACAE MERCHAN | MG 345 kV MACAE MERCHAN MG1 RJ | RB | FT MG 345 kV MACAE MERCHAN MG1 RJ | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/31/2017 | 3/27/2033 | R$5,062.35 | 6/1/2025 | Ativa | Substituição do Servidores e IHM do Sistema de Supervisão e Controle Local (SAGE) por obsolescência ou por atualização tecnológica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MACAE MERCHAN | MC 345 kV RTB 345 kV 60 Mvar MACAE MERCHAN RT1 RJ | RB | FT RTB 345 kV 60 Mvar MACAE MERCHAN RT1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$230,033.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MACAE MERCHAN | IB 345 kV MG 345 kV MACAE MERCHAN MG2 RJ IB3 | RB | FT MG 345 kV MACAE MERCHAN MG2 RJ | 006/2005 | IGPM | RBL | CC 006/2005 | 6/2/2010 | 3/4/2035 | R$596,520.32 | 6/1/2025 | Ativa | T2000-015 | Contrato de Concessão nº 006/2005 *(Considera adicional de RGR relativo à prorrogação do encargo) | ||
| AXIA Energia | MACAE MERCHAN | IB 345 kV MG 345 kV MACAE MERCHAN MG1 RJ IB2 | RB | FT MG 345 kV MACAE MERCHAN MG1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MACAE MERCHAN | IB 345 kV MG 345 kV MACAE MERCHAN MG1 RJ IB1 | RB | FT MG 345 kV MACAE MERCHAN MG1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MACAE MERCHAN | EL 345 kV MACAE MERCHAN LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ | RB | FT LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,201.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MACAE MERCHAN | EL 345 kV MACAE MERCHAN LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ | RB | FT LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ | 062/2001 | IPCA | RBNIA | REA 13338/2022 | R$457,480.12 | 6/1/2025 | Prevista | T2022-112 | Substituição de alguns equipamentos do Módulo de Manobra Entrada de Linha na SE Macaé Merchan devido ao seccionamento do circuito LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ na SE LAGOS | ||||
| AXIA Energia | MACAE MERCHAN | EL 345 kV MACAE MERCHAN LT 345 kV MACAE MERCHAN /LAGOS C-1 RJ | RB | FT LT 345 kV MACAE MERCHAN /LAGOS C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,201.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MACAE MERCHAN | EL 345 kV MACAE MERCHAN LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ | RB | FT LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ | 006/2005 | IGPM | RBL | CC 006/2005 | 6/2/2010 | 3/4/2035 | R$ 1,546,031.09 | 6/1/2025 | Ativa | T2000-015 | Contrato de Concessão nº 006/2005 *(Considera adicional de RGR relativo à prorrogação do encargo) | ||
| AXIA Energia | MACAE MERCHAN | EL 345 kV MACAE MERCHAN LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ | RB | FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,201.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MACAE MERCHAN | EL 345 kV MACAE MERCHAN LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ | RB | FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/6/2022 | 6/5/2037 | R$99,441.15 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | MACAE MERCHAN | EL 345 kV MACAE MERCHAN LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ | RB | FT LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,201.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MACAE MERCHAN | EL 345 kV MACAE MERCHAN LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ | RB | FT LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ | 062/2001 | IPCA | RMEL | REN 905/2020 | 4/14/2022 | 4/13/2037 | R$135,967.41 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | MACAMBARA | EL 230 kV MACAMBARA LT 230 kV MACAMBARA /MACAMBARA 3 C-2 RS | RB | FT LT 230 kV MACAMBARA /MACAMBARA 3 C-2 RS | 007/2014 | IPCA | RBL | CC 007/2014 | 12/6/2019 | 1/29/2044 | R$668,754.66 | 6/1/2025 | Ativa | T2014-021-A | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | MACAMBARA 3 | RTL 230 kV 30 Mvar MACAMBARA 3 RT2 RS | RB | FT RTL 230 kV 30 Mvar MACAMBARA 3 RT2 RS | 007/2014 | IPCA | RBL | CC 007/2014 | 12/6/2019 | 1/29/2044 | R$474,252.43 | 6/1/2025 | Ativa | T2014-021-A | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | MACAMBARA 3 | MG 230 kV MACAMBARA 3 MG3 RS | RB | FT MG 230 kV MACAMBARA 3 MG3 RS | 007/2014 | IPCA | RBNI | DSP 1135/2024 | 12/29/2023 | 12/28/2041 | R$72,907.75 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo Geral de Acessante 230 kV na SE Maçambará 3, associado as Entradas de Linha 230 kV para as SEs Santo Ângelo C2 e Maçambará C2, em função do seccionamento da LT 230 kV Santo Ângelo - Maçambará C2 na Subestação seccionadora Maçambará 3. | |||
| AXIA Energia Sul | MACAMBARA 3 | MG 230 kV MACAMBARA 3 MG3 RS | RB | FT MG 230 kV MACAMBARA 3 MG3 RS | 007/2014 | IPCA | RBNI | DSP 1135/2024 | 12/29/2023 | 12/28/2054 | R$23,267.04 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 230 kV na SE Maçambará 3, associados a Entrada de Linha 230 kV para a SE Santo Ângelo C2, em função do seccionamento da LT 230 kV Santo Ângelo - Maçambará C2 na Subestação seccionadora Maçambará 3. | |||
| AXIA Energia Sul | MACAMBARA 3 | MG 230 kV MACAMBARA 3 MG3 RS | RB | FT MG 230 kV MACAMBARA 3 MG3 RS | 007/2014 | IPCA | RBNI | DSP 1135/2024 | 12/29/2023 | 12/28/2054 | R$23,267.04 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 230 kV na SE Maçambará 3, associados a Entrada de Linha 230 kV para a SE Maçambará C2, em função do seccionamento da LT 230 kV Santo Ângelo - Maçambará C2 na Subestação seccionadora Maçambará 3. | |||
| AXIA Energia Sul | MACAMBARA 3 | MC 230 kV RTL 230 kV 30 Mvar MACAMBARA 3 RT2 RS | RB | FT RTL 230 kV 30 Mvar MACAMBARA 3 RT2 RS | 007/2014 | IPCA | RBL | CC 007/2014 | 12/6/2019 | 1/29/2044 | R$193,236.73 | 6/1/2025 | Ativa | T2014-021-A | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | MACAMBARA 3 | EL 230 kV MACAMBARA 3 LT 230 kV MACAMBARA 3 /SANTO ANGELO C-2 RS | RB | FT LT 230 kV MACAMBARA 3 /SANTO ANGELO C-2 RS | 007/2014 | IPCA | RBNI | DSP 1135/2024 | 12/29/2023 | 12/28/2051 | R$213,519.94 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo Barra Dupla a Quatro Chaves, na Subestação Maçambará 3, associada à Linha de Transmissão 230 kV Santo Ângelo – Maçambará 3 C2. | |||
| AXIA Energia Sul | MACAMBARA 3 | EL 230 kV MACAMBARA 3 LT 230 kV MACAMBARA /MACAMBARA 3 C-2 RS | RB | FT LT 230 kV MACAMBARA /MACAMBARA 3 C-2 RS | 007/2014 | IPCA | RBNI | DSP 1135/2024 | 12/29/2023 | 12/28/2051 | R$213,519.94 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo Barra Dupla a Quatro Chaves, na Subestação Maçambará 3, associada à Linha de Transmissão 230 kV Maçambará 3 – Maçambará C2. | |||
| AXIA Energia Nordeste | MACEIO | TT 69/0 kV MACEIO TA1 AL | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MACEIO | TT 69/0 kV MACEIO TA1 AL | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/2/2022 | 3/1/2050 | R$21,274.62 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MACEIO | TR 230/69 kV MACEIO TR4 AL | RBF | FT TR 230/69 kV MACEIO TR4 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | TR 230/69 kV MACEIO TR3 AL | RBF | FT TR 230/69 kV MACEIO TR3 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | TR 230/69 kV MACEIO TR3 AL | RBF | FT TR 230/69 kV MACEIO TR3 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | TR 230/69 kV MACEIO TR3 AL | RBF | FT TR 230/69 kV MACEIO TR3 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$913,997.96 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | TR 230/69 kV MACEIO TR3 AL | RBF | FT TR 230/69 kV MACEIO TR3 AL | 061/2001 | IPCA | RMELP | REA 14107/2023 | R$ 2,444,320.28 | 6/1/2025 | Prevista | T2023-054 | Obra de Substituição Completa - Substituição do transformador 04T3 da SE MCO. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 004520/2018 | ||||
| AXIA Energia Nordeste | MACEIO | TR 230/69 kV MACEIO TR3 AL | RBF | FT TR 230/69 kV MACEIO TR3 AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/6/2021 | 9/13/2056 | R$75,488.89 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MACEIO | TR 230/69 kV MACEIO TR2 AL | RBF | FT TR 230/69 kV MACEIO TR2 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | TR 230/69 kV MACEIO TR2 AL | RBF | FT TR 230/69 kV MACEIO TR2 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | TR 230/69 kV MACEIO TR2 AL | RBF | FT TR 230/69 kV MACEIO TR2 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$913,997.96 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | TR 230/69 kV MACEIO TR1 AL | RBF | FT TR 230/69 kV MACEIO TR1 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | TR 230/69 kV MACEIO TR1 AL | RBF | FT TR 230/69 kV MACEIO TR1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | TR 230/69 kV MACEIO TR1 AL | RBF | FT TR 230/69 kV MACEIO TR1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$913,997.96 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | MG 230 kV MACEIO MG1 AL | RB | FT MG 230 kV MACEIO MG1 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$501,211.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | MG 230 kV MACEIO MG1 AL | RB | FT MG 230 kV MACEIO MG1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,406,484.26 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | MG 230 kV MACEIO MG1 AL | RB | FT MG 230 kV MACEIO MG1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,296,606.65 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | MG 230 kV MACEIO MG1 AL | RB | FT MG 230 kV MACEIO MG1 AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/28/2020 | 8/11/2036 | R$181,580.60 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MACEIO | MC 69 kV TR 230/69 kV MACEIO TR4 AL | RBF | FT TR 230/69 kV MACEIO TR4 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$70,675.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | MC 69 kV TR 230/69 kV MACEIO TR3 AL | RBF | FT TR 230/69 kV MACEIO TR3 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$70,675.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | MC 69 kV TR 230/69 kV MACEIO TR3 AL | RBF | FT TR 230/69 kV MACEIO TR3 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$198,327.26 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | MC 69 kV TR 230/69 kV MACEIO TR3 AL | RBF | FT TR 230/69 kV MACEIO TR3 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$182,833.50 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | MC 69 kV TR 230/69 kV MACEIO TR2 AL | RBF | FT TR 230/69 kV MACEIO TR2 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$70,675.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | MC 69 kV TR 230/69 kV MACEIO TR2 AL | RBF | FT TR 230/69 kV MACEIO TR2 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$198,327.26 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | MC 69 kV TR 230/69 kV MACEIO TR1 AL | RBF | FT TR 230/69 kV MACEIO TR1 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$70,675.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | MC 230 kV TR 230/69 kV MACEIO TR4 AL | RBF | FT TR 230/69 kV MACEIO TR4 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | MC 230 kV TR 230/69 kV MACEIO TR4 AL | RBF | FT TR 230/69 kV MACEIO TR4 AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/6/2022 | 12/16/2040 | R$29,289.57 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MACEIO | MC 230 kV TR 230/69 kV MACEIO TR3 AL | RBF | FT TR 230/69 kV MACEIO TR3 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | MC 230 kV TR 230/69 kV MACEIO TR3 AL | RBF | FT TR 230/69 kV MACEIO TR3 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$410,719.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | MC 230 kV TR 230/69 kV MACEIO TR3 AL | RBF | FT TR 230/69 kV MACEIO TR3 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$378,633.35 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | MC 230 kV TR 230/69 kV MACEIO TR3 AL | RBF | FT TR 230/69 kV MACEIO TR3 AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/25/2022 | 2/24/2037 | R$21,300.87 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MACEIO | MC 230 kV TR 230/69 kV MACEIO TR2 AL | RBF | FT TR 230/69 kV MACEIO TR2 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | MC 230 kV TR 230/69 kV MACEIO TR2 AL | RBF | FT TR 230/69 kV MACEIO TR2 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$410,719.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | MC 230 kV TR 230/69 kV MACEIO TR2 AL | RBF | FT TR 230/69 kV MACEIO TR2 AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/16/2020 | 6/15/2045 | R$88,392.54 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MACEIO | MC 230 kV TR 230/69 kV MACEIO TR1 AL | RBF | FT TR 230/69 kV MACEIO TR1 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | MC 230 kV TR 230/69 kV MACEIO TR1 AL | RBF | FT TR 230/69 kV MACEIO TR1 AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/18/2020 | 12/31/2045 | R$43,612.91 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MACEIO | IB 230 kV MG 230 kV MACEIO MG1 AL IB1 | RB | FT MG 230 kV MACEIO MG1 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,837.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | IB 230 kV MG 230 kV MACEIO MG1 AL IB1 | RB | FT MG 230 kV MACEIO MG1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$325,059.40 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | IB 230 kV MG 230 kV MACEIO MG1 AL IB1 | RB | FT MG 230 kV MACEIO MG1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$299,665.05 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-2 AL | RB | FT LT 230 kV MESSIAS /MACEIO C-2 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-2 AL | RB | FT LT 230 kV MESSIAS /MACEIO C-2 AL | 061/2001 | IPCA | RBNI | REA 2040/2009 | 1/28/2013 | 1/31/2043 | R$51,888.43 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 230 kV associadas ao disjuntor 14S7 autorizada pela REA 2040/2009. Reforço incluído no reajuste ciclo 2013-2014. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MACEIO | EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-2 AL | RB | FT LT 230 kV MESSIAS /MACEIO C-2 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$596,907.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-2 AL | RB | FT LT 230 kV MESSIAS /MACEIO C-2 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$550,275.38 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-2 AL | RB | FT LT 230 kV MESSIAS /MACEIO C-2 AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/21/2021 | 2/24/2051 | R$113,832.47 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MACEIO | EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-1 AL | RB | FT LT 230 kV MESSIAS /MACEIO C-1 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-1 AL | RB | FT LT 230 kV MESSIAS /MACEIO C-1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$596,907.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-1 AL | RB | FT LT 230 kV MESSIAS /MACEIO C-1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$550,275.38 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MACEIO | EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-1 AL | RB | FT LT 230 kV MESSIAS /MACEIO C-1 AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/30/2019 | 10/2/2049 | R$61,825.50 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MACEIO II | TT 69/0 kV MACEIO II TT1 AL | DIT | 005/2012 | IPCA | RPEC | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$193,029.60 | 6/1/2025 | Ativa | T2012-057-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | MACEIO II | TR 230/69 kV MACEIO II TR2 AL | RBF | FT TR 230/69 kV MACEIO II TR2 AL | 005/2012 | IPCA | RBL | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$ 1,456,488.59 | 6/1/2025 | Ativa | T2012-057-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MACEIO II | TR 230/69 kV MACEIO II TR1 AL | RBF | FT TR 230/69 kV MACEIO II TR1 AL | 005/2012 | IPCA | RBL | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$ 1,456,488.59 | 6/1/2025 | Ativa | T2012-057-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MACEIO II | MG 230 kV MACEIO II MG1 AL | RB | FT MG 230 kV MACEIO II MG1 AL | 005/2012 | IPCA | RBL | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$ 1,184,570.13 | 6/1/2025 | Ativa | T2012-057-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MACEIO II | MG 230 kV MACEIO II MG1 AL | RB | FT MG 230 kV MACEIO II MG1 AL | 005/2012 | IPCA | RBNI | REN 1020/2022 | 1/20/2025 | 1/19/2056 | R$44,710.86 | 6/1/2025 | Ativa | MIM ASSOCIADO: Implantação de Entrada de Linha 69 kV, arranjo BPT, com destino à SE Ipioca na SE MACEIÓ II. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2025 - 2026 | |||
| AXIA Energia Nordeste | MACEIO II | MC 69 kV TT 69/0 kV MACEIO II TT1 AL | DIT | 005/2012 | IPCA | RPEC | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$71,927.01 | 6/1/2025 | Ativa | T2012-057-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | MACEIO II | MC 69 kV TR 230/69 kV MACEIO II TR2 AL | RBF | FT TR 230/69 kV MACEIO II TR2 AL | 005/2012 | IPCA | RBL | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$168,379.95 | 6/1/2025 | Ativa | T2012-057-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MACEIO II | MC 69 kV TR 230/69 kV MACEIO II TR1 AL | RBF | FT TR 230/69 kV MACEIO II TR1 AL | 005/2012 | IPCA | RBL | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$168,379.95 | 6/1/2025 | Ativa | T2012-057-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MACEIO II | MC 230 kV TR 230/69 kV MACEIO II TR2 AL | RBF | FT TR 230/69 kV MACEIO II TR2 AL | 005/2012 | IPCA | RBL | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$413,672.95 | 6/1/2025 | Ativa | T2012-057-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MACEIO II | MC 230 kV TR 230/69 kV MACEIO II TR1 AL | RBF | FT TR 230/69 kV MACEIO II TR1 AL | 005/2012 | IPCA | RBL | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$413,672.95 | 6/1/2025 | Ativa | T2012-057-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MACEIO II | IB 69 kV MG 230 kV MACEIO II MG1 AL IB1 | DIT | 005/2012 | IPCA | RPEC | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$117,019.10 | 6/1/2025 | Ativa | T2012-057-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | MACEIO II | IB 230 kV MG 230 kV MACEIO II MG1 AL IB1 | RB | FT MG 230 kV MACEIO II MG1 AL | 005/2012 | IPCA | RBL | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$361,050.68 | 6/1/2025 | Ativa | T2012-057-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MACEIO II | EL 69 kV MACEIO II IPIOCA | DIT | 005/2012 | IPCA | RCDM | REN 1020/2022 | 1/20/2025 | 1/19/2053 | R$514,038.85 | 6/1/2025 | Ativa | Instalar um módulo de entrada de linha 69 kV, arranjo BPT, com destino à SE Ipioca na SE MACEIÓ II. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2025 - 2026 | ||||
| AXIA Energia Nordeste | MACEIO II | EL 69 kV MACEIO II DIST4 | DIT | 005/2012 | IPCA | RPEC | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$199,203.88 | 6/1/2025 | Ativa | T2012-057-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | MACEIO II | EL 69 kV MACEIO II DIST3 | DIT | 005/2012 | IPCA | RPEC | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$199,203.88 | 6/1/2025 | Ativa | T2012-057-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | MACEIO II | EL 69 kV MACEIO II DIST2 | DIT | 005/2012 | IPCA | RPEC | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$199,203.88 | 6/1/2025 | Ativa | T2012-057-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | MACEIO II | EL 69 kV MACEIO II DIST1 | DIT | 005/2012 | IPCA | RPEC | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$199,203.88 | 6/1/2025 | Ativa | T2012-057-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | MACEIO II | EL 230 kV MACEIO II LT 230 kV MESSIAS /MACEIO II C-2 AL | RB | FT LT 230 kV MESSIAS /MACEIO II C-2 AL | 005/2012 | IPCA | RBL | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$633,757.47 | 6/1/2025 | Ativa | T2012-057-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MACEIO II | EL 230 kV MACEIO II LT 230 kV MESSIAS /MACEIO II C-1 AL | RB | FT LT 230 kV MESSIAS /MACEIO II C-1 AL | 005/2012 | IPCA | RBL | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$633,757.47 | 6/1/2025 | Ativa | T2012-057-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Sul | MACHADINHO | MG 500 kV MACHADINHO MG1 SC | RB | FT MG 500 kV MACHADINHO MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$698,027.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | MACHADINHO | MG 500 kV MACHADINHO MG1 SC | RB | FT MG 500 kV MACHADINHO MG1 SC | 057/2001 | IPCA | RMEL | REN 905/2020 | 10/31/2022 | 10/30/2037 | R$53,248.17 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | MACHADINHO | IB 500 kV MG 500 kV MACHADINHO MG1 SC IB1 | RB | FT MG 500 kV MACHADINHO MG1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | MACHADINHO | EL 500 kV MACHADINHO LT 500 kV ITA /MACHADINHO C-1 SC | RB | FT LT 500 kV ITA /MACHADINHO C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | MACHADINHO | EL 500 kV MACHADINHO LT 500 kV C.NOVOS /MACHADINHO C-1 SC | RB | FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | TR 500/230 kV MARABA TRR2 PA | RB | FT TR 500/230 kV MARABA TRR2 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$673,903.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | TR 500/230 kV MARABA TRR2 PA | RB | FT TR 500/230 kV MARABA TRR2 PA | 058/2001 | IPCA | RMEL | REN 443/2011 | 7/3/2016 | 7/2/2031 | R$28,212.53 | 6/1/2025 | Ativa | Instalação de Sistema de Monitoramento On-line buchas de 500 e 230 kV MBAT7 01, 02. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | MARABA | TR 500/230 kV MARABA TRR2 PA | RB | FT TR 500/230 kV MARABA TRR2 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 1/21/2019 | 12/31/2054 | R$7,513.25 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MARABA | TR 500/230 kV MARABA TRR1 PA | RB | FT TR 500/230 kV MARABA TRR1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$578,080.90 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | TR 500/230 kV MARABA TRR1 PA | RB | FT TR 500/230 kV MARABA TRR1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,254,969.55 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | TR 500/230 kV MARABA TRR1 PA | RB | FT TR 500/230 kV MARABA TRR1 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 7/30/2015 | 4/19/2047 | R$92,582.02 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MARABA | TR 500/230 kV MARABA TR2 PA | RB | FT TR 500/230 kV MARABA TR2 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,021,710.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | TR 500/230 kV MARABA TR1 PA | RB | FT TR 500/230 kV MARABA TR1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,734,242.70 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | TR 500/230 kV MARABA TR1 PA | RB | FT TR 500/230 kV MARABA TR1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,764,908.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | TR 500/230 kV MARABA TR1 PA | RB | FT TR 500/230 kV MARABA TR1 PA | 058/2001 | IPCA | RBNIA | REA 14879/2023 | R$ 6,921,417.15 | 6/1/2025 | Prevista | T2023-136 | Obra de Substituição Completa - Substituição do Banco de Autotransformadores T1 500/230 kV, 3x100 MVA, por novo Banco de Autotransformadores 500/230 kV, 3x150 MVA, na SE Marabá. (Rotina-Substituição - IdeMdl 9116). | ||||
| AXIA Energia Norte | MARABA | TR 500/230 kV MARABA TR1 PA | RB | FT TR 500/230 kV MARABA TR1 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2017 | 12/8/2052 | R$190,473.04 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MARABA | TR 230/69 kV MARABA TR3 PA | RBF | FT TR 230/69 kV MARABA TR3 PA | 058/2001 | IPCA | RBNI | REA 2533/2010 | 1/28/2013 | 8/15/2047 | R$939,238.94 | 6/1/2025 | Ativa | T2009-109 | SE Marabá: Instalação do terceiro transformador trifásico 230/69 kV , 33 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MARABA | TR 230/69 kV MARABA TF3 PA | RBF | FT TR 230/69 kV MARABA TF3 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,818.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | TR 230/69 kV MARABA TF3 PA | RBF | FT TR 230/69 kV MARABA TF3 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$475,037.42 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | TR 230/69 kV MARABA TF3 PA | RBF | FT TR 230/69 kV MARABA TF3 PA | 058/2001 | IPCA | RBNIA | DSP 3025/2023 | R$ 2,468,680.58 | 6/1/2025 | Prevista | T2023-137 | Obra de Substituição Completa - Instalar, na SE MARABA, de uma transformação trifásica TR5 230/69-13,8 KV - 100 MVA. (Rotina-Substituição - o IdeMdl 9113 será substituído pelo novo equipamento). | ||||
| AXIA Energia Norte | MARABA | TR 230/69 kV MARABA TF2 PA | RBF | FT TR 230/69 kV MARABA TF2 PA | 058/2001 | IPCA | RBNI | REA 10934/2021 | 6/13/2024 | 6/12/2059 | R$ 2,622,840.24 | 6/1/2025 | Ativa | T2020-071 | Obra de Substituição Completa - Substituição do 2° Transformador Trifásico, 230/69 kV, de 33 MVA por unidade de 100 MVA, na SE Marabá. As receitas associadas a Portaria 579/2012 e Portaria 120/2016 (componente financeiro) deverão ser canceladas após a entrada em operação comercial do empreendimento T2020-071. | ||
| AXIA Energia Norte | MARABA | TR 230/13,8 kV MARABA TRR1 PA | RB | FT TR 230/13,8 kV MARABA TRR1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$506,851.71 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | TR 230/13,8 kV MARABA TRR1 PA | RB | FT TR 230/13,8 kV MARABA TRR1 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 12/14/2014 | 12/16/2044 | R$55,896.38 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MARABA | TR 230/13,8 kV MARABA TF1 PA | RB | FT CS 150/-90 MVAr MARABA CS1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$506,851.71 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | TR 230/13,8 kV MARABA TF1 PA | RB | FT CS 150/-90 MVAr MARABA CS1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,100,336.42 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | TR 230/13,8 kV MARABA TF1 PA | RB | FT CS 150/-90 MVAr MARABA CS1 PA | 058/2001 | IPCA | RMEL | REN 443/2011 | 12/16/2016 | 12/15/2031 | R$30,596.62 | 6/1/2025 | Ativa | Implantação de sistema de medição e monitoramento on-line de Buchas Condensivas do equipamento MBTF6-01 para integrar ao SISTEMA DE SUPERVISÃO SAGE. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | MARABA | TR 230/13,8 kV MARABA TF1 PA | RB | FT CS 150/-90 MVAr MARABA CS1 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/15/2022 | 10/23/2057 | R$72,746.29 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MARABA | RTN 69 kV 0 Mvar MARABA RN5 PA | RB | FT LT 500 kV MARABA /TUCURUI C-2 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$16,446.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | RTL 500 kV 45,45 Mvar MARABA RTR2 PA | RB | FT RTL 500 kV 45,45 Mvar MARABA RTR2 PA | 058/2001 | IPCA | RMEL | REA 9918/2021 | 2/19/2024 | 2/18/2060 | R$729,306.90 | 6/1/2025 | Ativa | T2021-021 | Obra de Substituição Completa - Substituição, na SE MARABA, de um Banco de Reatores de Linha Monofásicos RTR2 500 kV - 45,45 Mvar. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Norte | MARABA | RTL 500 kV 45,45 Mvar MARABA RTR1 PA | RB | FT RTL 500 kV 45,45 Mvar MARABA RTR1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$298,162.12 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | RTL 500 kV 45,45 Mvar MARABA RTR1 PA | RB | FT RTL 500 kV 45,45 Mvar MARABA RTR1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$647,287.22 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | RTL 500 kV 45,45 Mvar MARABA RTR1 PA | RB | FT RTL 500 kV 45,45 Mvar MARABA RTR1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$620,811.24 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | RTL 500 kV 136 Mvar MARABA RT4 PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$405,086.52 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | RTL 500 kV 136 Mvar MARABA RT4 PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$879,411.94 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | RTL 500 kV 136 Mvar MARABA RT4 PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$843,441.38 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | RTL 500 kV 136 Mvar MARABA RT4 PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | 058/2001 | IPCA | RMELP | REA 14780/2023 | R$ 1,938,482.98 | 6/1/2025 | Prevista | T2023-070 | Obra de Substituição Parcial - Substituição do Reator - MBRE7-04, 500 kV, 150 Mvar, da LT 500 kV Marabá – Imperatriz C2, somente as Fases A e V. SGPMR 0001008/2021. | ||||
| AXIA Energia Norte | MARABA | RTL 500 kV 136 Mvar MARABA RT4 PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/18/2020 | 10/28/2056 | R$63,555.25 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MARABA | RTL 500 kV 136 Mvar MARABA RT3 PA | RB | FT LT 500 kV MARABA /TUCURUI C-2 PA | 058/2001 | IPCA | RMEL | REA 9918/2021 | 8/5/2023 | 8/4/2059 | R$ 2,165,814.79 | 6/1/2025 | Ativa | T2021-020 | Obra de Substituição Completa - Substituição, na SE MARABA, de um Reator de Linha Trifásico RT3 500 kV - 136 Mvar. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Norte | MARABA | RTL 500 kV 136 Mvar MARABA RT2 PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA | 058/2001 | IPCA | RMEL | REA 9918/2021 | 4/2/2024 | 4/1/2060 | R$ 2,187,920.71 | 6/1/2025 | Ativa | T2021-021 | Obra de Substituição Completa - Substituição, na SE MARABA, de um Reator de Linha Trifásico RT2 500 kV - 136 Mvar. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Norte | MARABA | RTL 500 kV 136 Mvar MARABA RT1 PA | RB | FT LT 500 kV MARABA /TUCURUI C-1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$405,086.52 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | RTL 500 kV 136 Mvar MARABA RT1 PA | RB | FT LT 500 kV MARABA /TUCURUI C-1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$879,411.94 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | RTL 500 kV 136 Mvar MARABA RT1 PA | RB | FT LT 500 kV MARABA /TUCURUI C-1 PA | 058/2001 | IPCA | RMELP | REA 11450/2022 | R$ 2,747,171.80 | 6/1/2025 | Prevista | T2022-045 | Obra de Substituição Completa - Substituir na SE Marabá o reator monofásico - RT1 - 500 kV - 3x50 MVAr por outro de 3x50 MVAr.As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | 4T25 | |||
| AXIA Energia Norte | MARABA | RTB 500 kV 55 Mvar MARABA RTR3 PA | RB | FT RTB 500 kV 55 Mvar MARABA RTR3 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$316,767.85 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | RTB 500 kV 55 Mvar MARABA RTR3 PA | RB | FT RTB 500 kV 55 Mvar MARABA RTR3 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/18/2020 | 10/28/2056 | R$9,248.06 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MARABA | RTB 500 kV 55 Mvar MARABA RTR1 PA | RB | FT RTB 500 kV 55 Mvar MARABA RTR1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$316,767.85 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | RTB 500 kV 165 Mvar MARABA RT8 PA | RB | FT RTB 500 kV 165 Mvar MARABA RT8 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$423,942.99 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | RTB 500 kV 165 Mvar MARABA RT6 PA | RB | FT RTB 500 kV 165 Mvar MARABA RT6 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$423,942.99 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | RTB 500 kV 165 Mvar MARABA RT10 PA | RB | FT RTB 500 kV 165 Mvar MARABA RT10 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$423,942.99 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | MG 500 kV MARABA MG1 PA | RB | FT MG 500 kV MARABA MG1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,199,159.39 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | MG 500 kV MARABA MG1 PA | RB | FT MG 500 kV MARABA MG1 PA | 058/2001 | IPCA | RBNI | REA 10934/2021 | 6/13/2024 | 6/12/2055 | R$159,714.86 | 6/1/2025 | Ativa | T2020-071 | Complementação dos Módulos de Infraestrutura Geral, (230 kV, BD5) referente a substituição do 2° Transformador Trifásico, 230/69 kV, de 33 MVA por unidade de 100 MVA, na SE Marabá. | ||
| AXIA Energia Norte | MARABA | MG 500 kV MARABA MG1 PA | RB | FT MG 500 kV MARABA MG1 PA | 058/2001 | IPCA | RBNI | REA 10934/2021 | 6/13/2024 | 6/12/2055 | R$45,900.73 | 6/1/2025 | Ativa | T2020-071 | Complementação dos Módulos de Infraestrutura Geral, (69 kV, BPT) referente a substituição do 2° Transformador Trifásico, 230/69 kV, de 33 MVA por unidade de 100 MVA, na SE Marabá. | ||
| AXIA Energia Norte | MARABA | MG 500 kV MARABA MG1 PA | RB | FT MG 500 kV MARABA MG1 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 10/25/2017 | 2/10/2041 | R$460,566.59 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MARABA | MG 500 kV MARABA MG1 PA | RB | FT MG 500 kV MARABA MG1 PA | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 2/1/2013 | 2/4/2043 | R$56,630.26 | 6/1/2025 | Ativa | EDIFICACAO GALPAO P COLETA SELETIVA DE RESIDUOS EM ALVENARIA E COBERTURA EM ESTRUTURA METALICA E TELHAS TERMOAR APROXIMADAMENTE 300M Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MARABA | MG 500 kV MARABA MG1 PA | RB | FT MG 500 kV MARABA MG1 PA | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 9/17/2012 | 9/16/2040 | R$22,037.43 | 6/1/2025 | Ativa | 01 GPS E 04 RDPS DE 8 CANAIS ANALOGICOS E 32 DIGITAIS PROVIDO DE AQUISICAO DE FALTA POR ONDAS VIAJANTES PARA AS LINHAS LT TCMB1TCMB2 MBIZ1 E MBIZ2 Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MARABA | MG 500 kV MARABA MG1 PA | RB | FT MG 500 kV MARABA MG1 PA | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 7/3/2019 | 7/2/2036 | R$41,499.32 | 6/1/2025 | Ativa | SUSBTITUICAO DOS BANCOS DE BATERIAS 125 VCC 600 AH Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MARABA | MC 69 kV TR 230/69 kV MARABA TR3 PA | RBF | FT TR 230/69 kV MARABA TR3 PA | 058/2001 | IPCA | RBNI | REA 2533/2010 | 1/28/2013 | 10/14/2042 | R$356,899.53 | 6/1/2025 | Ativa | T2009-109 | SE MARABÁ: Instalação de Módulo de Manobra com Conexão 69kV, com Barra Principal de Transferência. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MARABA | MC 69 kV TR 230/69 kV MARABA TF3 PA | RBF | FT TR 230/69 kV MARABA TF3 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$74,722.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | MC 69 kV TR 230/69 kV MARABA TF3 PA | RBF | FT TR 230/69 kV MARABA TF3 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 7/10/2019 | 7/9/2052 | R$70,422.30 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MARABA | MC 69 kV TR 230/69 kV MARABA TF2 PA | RBF | FT TR 230/69 kV MARABA TF2 PA | 058/2001 | IPCA | RBNI | REA 10934/2021 | 6/13/2024 | 6/12/2052 | R$578,172.94 | 6/1/2025 | Ativa | T2020-071 | Obra de Substituição Completa - Conexão do Transformador 69 kV, arranjo BPT, referente a substituição do 2° Transformador Trifásico, 230/69 kV, de 33 MVA por unidade de 100 MVA, na SE Marabá. A receita associada a Portaria 579/2012 deverá ser cancelada após a entrada em operação comercial do empreendimento T2020-071. | ||
| AXIA Energia Norte | MARABA | MC 500 kV TR 500/230 kV MARABA TR2 PA | RB | FT TR 500/230 kV MARABA TR2 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$494,028.38 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | MC 500 kV TR 500/230 kV MARABA TR1 PA | RB | FT TR 500/230 kV MARABA TR1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$494,028.38 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | MC 500 kV TR 500/230 kV MARABA TR1 PA | RB | FT TR 500/230 kV MARABA TR1 PA | 058/2001 | IPCA | RBNIA | REA 14879/2023 | R$ 2,401,308.92 | 6/1/2025 | Prevista | T2023-136 | Obra de Substituição Completa - Substituição da Conexão em 500 kV, DJM, associada ao Banco de Autotransformadores T1 500/230 kV, na SE Marabá. (Rotina-Substituição - IdeMdl 9117). | ||||
| AXIA Energia Norte | MARABA | MC 500 kV RTL 500 kV 136 Mvar MARABA RT4 PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$299,304.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | MC 500 kV RTL 500 kV 136 Mvar MARABA RT3 PA | RB | FT LT 500 kV MARABA /TUCURUI C-2 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$299,304.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | MC 500 kV RTL 500 kV 136 Mvar MARABA RT2 PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$299,304.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | MC 500 kV RTL 500 kV 136 Mvar MARABA RT2 PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA | 058/2001 | IPCA | RMEL | REA 2837/2011 | 12/30/2013 | 12/29/2037 | R$35,982.38 | 6/1/2025 | Ativa | Substituição de 03 Pararaios de 500 kV. Obra de melhoria inserida no ciclo de reajuste 2015/2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | MARABA | MC 500 kV RTL 500 kV 136 Mvar MARABA RT1 PA | RB | FT LT 500 kV MARABA /TUCURUI C-1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$299,304.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | MC 500 kV RTB 500 kV 165 Mvar MARABA RT8 PA | RB | FT RTB 500 kV 165 Mvar MARABA RT8 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$462,556.47 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | MC 500 kV RTB 500 kV 165 Mvar MARABA RT8 PA | RB | FT RTB 500 kV 165 Mvar MARABA RT8 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/16/2020 | 11/19/2050 | R$26,069.96 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MARABA | MC 500 kV RTB 500 kV 165 Mvar MARABA RT6 PA | RB | FT RTB 500 kV 165 Mvar MARABA RT6 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$423,178.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | MC 500 kV RTB 500 kV 165 Mvar MARABA RT10 PA | RB | FT RTB 500 kV 165 Mvar MARABA RT10 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$462,556.47 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | MC 500 kV RTB 500 kV 165 Mvar MARABA RT10 PA | RB | FT RTB 500 kV 165 Mvar MARABA RT10 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/16/2020 | 11/19/2050 | R$26,069.96 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MARABA | MC 500 kV CR 500 kV 348 Mvar MARABA BC1 PA | RB | FT CR 500 kV 348 MVAr MARABA BC1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$462,556.47 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | MC 500 kV CR 500 kV 283 Mvar MARABA BC2 PA | RB | FT CR 500 kV 283 MVAr MARABA BC2 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$462,556.47 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | MC 230 kV TR 500/230 kV MARABA TR2 PA | RB | FT TR 500/230 kV MARABA TR2 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$193,043.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | MC 230 kV TR 500/230 kV MARABA TR1 PA | RB | FT TR 500/230 kV MARABA TR1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$193,043.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | MC 230 kV TR 500/230 kV MARABA TR1 PA | RB | FT TR 500/230 kV MARABA TR1 PA | 058/2001 | IPCA | RMEL | REA 2837/2011 | 12/30/2013 | 12/29/2037 | R$35,982.38 | 6/1/2025 | Ativa | Substituição de 03 Pararaios de 500 kV. Obra de melhoria inserida no ciclo de reajuste 2015/2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | MARABA | MC 230 kV TR 500/230 kV MARABA TR1 PA | RB | FT TR 500/230 kV MARABA TR1 PA | 058/2001 | IPCA | RBNIA | REA 14879/2023 | R$ 1,617,165.11 | 6/1/2025 | Prevista | T2023-136 | Obra de Substituição Completa - Substituição da Conexão em 230 kV, BD5, associada ao Banco de Autotransformadores T1 500/230 kV, na SE Marabá. (Rotina-Substituição - IdeMdl 9118). | ||||
| AXIA Energia Norte | MARABA | MC 230 kV TR 500/230 kV MARABA TR1 PA | RB | FT TR 500/230 kV MARABA TR1 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 8/29/2022 | 8/31/2052 | R$34,130.14 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MARABA | MC 230 kV TR 230/69 kV MARABA TR3 PA | RBF | FT TR 230/69 kV MARABA TR3 PA | 058/2001 | IPCA | RBNI | REA 2533/2010 | 1/28/2013 | 9/19/2042 | R$945,097.16 | 6/1/2025 | Ativa | T2009-109 | SE MARABÉ: Instalação do módulo de manobra 230 kV para conexão de transformador, arranjo barra dupla a cinco chaves. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MARABA | MC 230 kV TR 230/69 kV MARABA TF3 PA | RBF | FT TR 230/69 kV MARABA TF3 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$193,043.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | MC 230 kV TR 230/69 kV MARABA TF2 PA | RBF | FT TR 230/69 kV MARABA TF2 PA | 058/2001 | IPCA | RBNI | REA 10934/2021 | 6/13/2024 | 6/12/2052 | R$ 1,547,410.66 | 6/1/2025 | Ativa | T2020-071 | Obra de Substituição Completa - Conexão do Transformador 230 kV, arranjo BD5, referente a substituição do 2° Transformador Trifásico, 230/69 kV, de 33 MVA por unidade de 100 MVA, na SE Marabá. | ||
| AXIA Energia Norte | MARABA | MC 230 kV TR 230/13,8 kV MARABA TF1 PA | RB | FT CS 150/-90 MVAr MARABA CS1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$193,043.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | MC 230 kV TR 230/13,8 kV MARABA TF1 PA | RB | FT CS 150/-90 MVAr MARABA CS1 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 5/27/2013 | 5/26/2037 | R$16,103.78 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MARABA | MC 230 kV TR 230/13,8 kV MARABA TF1 PA | RB | FT CS 150/-90 MVAr MARABA CS1 PA | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 12/18/2016 | 2/19/2043 | R$11,884.13 | 6/1/2025 | Ativa | Implantacao de sistema de medicao e monitoramento online de Buchas Condensivas do equipamento UGTF601 para integrar ao SISTEMA DE SUPERVISAO SAGE Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MARABA | MC 13,8 kV CS 150/-90 Mvar MARABA CS1 PA | RB | FT CS 150/-90 MVAr MARABA CS1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$71,981.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | IB 69 kV MG 500 kV MARABA MG1 PA IB1 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$50,221.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MARABA | IB 69 kV MG 500 kV MARABA MG1 PA IB1 | DIT | 058/2001 | IPCA | RMEL | REN 905/2020 | 7/11/2019 | 7/10/2052 | R$70,427.56 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | MARABA | IB 500 kV MG 500 kV MARABA MG1 PA IB7 | RB | FT MG 500 kV MARABA MG1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$524,269.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | IB 500 kV MG 500 kV MARABA MG1 PA IB7 | RB | FT MG 500 kV MARABA MG1 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/16/2020 | 11/19/2050 | R$26,069.96 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MARABA | IB 500 kV MG 500 kV MARABA MG1 PA IB4 | RB | FT MG 500 kV MARABA MG1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$524,269.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | IB 500 kV MG 500 kV MARABA MG1 PA IB3 | RB | FT MG 500 kV MARABA MG1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$524,269.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | IB 500 kV MG 500 kV MARABA MG1 PA IB2 | RB | FT MG 500 kV MARABA MG1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$524,269.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | IB 500 kV MG 500 kV MARABA MG1 PA IB1 | RB | FT MG 500 kV MARABA MG1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$524,269.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | IB 230 kV MG 500 kV MARABA MG1 PA IB1 | RB | FT MG 500 kV MARABA MG1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$158,618.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | EL 69 kV MARABA DIST3 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$87,355.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MARABA | EL 69 kV MARABA DIST3 | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$189,642.61 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MARABA | EL 69 kV MARABA DIST3 | DIT | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/14/2019 | 12/21/2051 | R$184,661.34 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | MARABA | EL 69 kV MARABA DIST2 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$87,355.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MARABA | EL 69 kV MARABA DIST2 | DIT | 058/2001 | IPCA | RMEL | REN 905/2020 | 5/25/2021 | 4/13/2050 | R$64,953.83 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | MARABA | EL 69 kV MARABA DIST1 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$87,355.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MARABA | EL 69 kV MARABA DIST1 | DIT | 058/2001 | IPCA | RMEL | REN 905/2020 | 7/12/2018 | 2/11/2050 | R$77,817.82 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | MARABA | EL 500 kV MARABA LT 500 kV MARABA /TUCURUI C-2 PA | RB | FT LT 500 kV MARABA /TUCURUI C-2 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$559,746.88 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | EL 500 kV MARABA LT 500 kV MARABA /TUCURUI C-2 PA | RB | FT LT 500 kV MARABA /TUCURUI C-2 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,215,167.79 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | EL 500 kV MARABA LT 500 kV MARABA /TUCURUI C-1 PA | RB | FT LT 500 kV MARABA /TUCURUI C-1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$559,746.88 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | EL 500 kV MARABA LT 500 kV MARABA /TUCURUI C-1 PA | RB | FT LT 500 kV MARABA /TUCURUI C-1 PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 7/31/2015 | 8/2/2045 | R$229,232.03 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MARABA | EL 500 kV MARABA LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$559,746.88 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | EL 500 kV MARABA LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,215,167.79 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | EL 500 kV MARABA LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/18/2020 | 10/27/2055 | R$20,455.06 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MARABA | EL 500 kV MARABA LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$559,746.88 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | EL 500 kV MARABA LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA | 058/2001 | IPCA | RMEL | REA 2837/2011 | 12/30/2013 | 12/29/2037 | R$35,982.38 | 6/1/2025 | Ativa | Substituição de 03 Pararaios de 500 kV. Obra de melhoria inserida no ciclo de reajuste 2015/2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | MARABA | EL 500 kV MARABA LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA | RB | FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA | 058/2001 | IPCA | RMEL | REN 905/2020 | 4/20/2016 | 1/1/2045 | R$107,556.07 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MARABA | EL 230 kV MARABA LT 230 kV CARAJAS /MARABA C-1 PA | RB | FT LT 230 kV CARAJAS /MARABA C-1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$269,233.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | EL 230 kV MARABA LT 230 kV CARAJAS /MARABA C-1 PA | RB | FT LT 230 kV CARAJAS /MARABA C-1 PA | 058/2001 | IPCA | RMEL | REA 2837/2011 | 12/30/2013 | 12/29/2037 | R$34,606.22 | 6/1/2025 | Ativa | Substituição de 06 Pararaios de 230 kV. Melhoria cadastrada no ciclo de reajuste 2015/2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | MARABA | EL 230 kV MARABA LT 230 kV CARAJAS /MARABA C-1 PA | RB | FT LT 230 kV CARAJAS /MARABA C-1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$584,485.94 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | EL 230 kV MARABA LT 230 kV CARAJAS /MARABA C-1 PA | RB | FT LT 230 kV CARAJAS /MARABA C-1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$560,578.73 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | EL 230 kV MARABA DIST2 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$269,233.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MARABA | EL 230 kV MARABA DIST2 | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$584,485.94 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MARABA | EL 230 kV MARABA DIST2 | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$560,578.73 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MARABA | EL 13,8 kV MARABA DIST3 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,540.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MARABA | CS 150/-90 Mvar MARABA CS1 PA | RB | FT CS 150/-90 MVAr MARABA CS1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,832,855.36 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | CS 150/-90 Mvar MARABA CS1 PA | RB | FT CS 150/-90 MVAr MARABA CS1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,978,989.21 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | CR 500 kV 348 Mvar MARABA BC1 PA | RB | FT CR 500 kV 348 MVAr MARABA BC1 PA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,319,963.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | CR 500 kV 348 Mvar MARABA BC1 PA | RB | FT CR 500 kV 348 MVAr MARABA BC1 PA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,865,540.71 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MARABA | CR 500 kV 348 Mvar MARABA BC1 PA | RB | FT CR 500 kV 348 MVAr MARABA BC1 PA | 058/2001 | IPCA | RMELP | REA 11450/2022 | R$ 12,572,940.66 | 6/1/2025 | Prevista | T2022-055 | Obra de Substituição Completa - Substituir na SE Marabá obanco de capacitores série MBCL7-01 - BC1 - 500 kV - 3x116 MVAr por outro de 3x116 MVAr.As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | 4T25 | |||
| AXIA Energia Norte | MARABA | CR 500 kV 283 Mvar MARABA BC2 PA | RB | FT CR 500 kV 283 MVAr MARABA BC2 PA | 058/2001 | IPCA | RMEL | REA 9918/2021 | 3/18/2024 | 3/17/2044 | R$ 12,335,367.43 | 6/1/2025 | Ativa | T2021-019 | Obra de Substituição Completa - Substituição, na SE MARABA, de um Banco de capacitores série BC2 500 kV - 283 Mvar. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||
| AXIA Energia Nordeste | MARACANAU | MG 230 kV MARACANAU MG2 CE | RB | FT MG 230 kV MARACANAU MG2 CE | 061/2001 | IPCA | RBNI | DSP 267/2023 | 5/20/2022 | 12/31/2042 | R$10,582.64 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 230 kV na SE Maracanaú II, associado a entrada de linha 230 kV para a SE Fortaleza II, em função do seccionamento da LT 230 kV Cauípe - Fortaleza II C3. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MARACANAU | MG 230 kV MARACANAU MG2 CE | RB | FT MG 230 kV MARACANAU MG2 CE | 061/2001 | IPCA | RBNI | DSP 267/2023 | 5/20/2022 | 12/31/2042 | R$10,582.64 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 230 kV na SE Maracanaú II, associado a entrada de linha 230 kV para a SE Cauípe, em função do seccionamento da LT 230 kV Cauípe - Fortaleza II C3. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MARACANAU | EL 230 kV MARACANAU LT 230 kV MARACANAU /FORTALEZA II C-1 CE | RB | FT LT 230 kV MARACANAU /FORTALEZA II C-1 CE | 061/2001 | IPCA | RBNI | DSP 267/2023 | 5/20/2022 | 12/31/2042 | R$216,564.01 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo Barra Dupla a Quatro Chaves, na subestação Maracanaú II, associada à Linha de Transmissão 230 kV Maracanaú II – Fortaleza II C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MARACANAU | EL 230 kV MARACANAU LT 230 kV CAUIPE /MARACANAU C-1 CE | RB | FT LT 230 kV CAUIPE /MARACANAU C-1 CE | 061/2001 | IPCA | RBNI | DSP 267/2023 | 5/20/2022 | 12/31/2042 | R$216,564.01 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo Barra Dupla a Quatro Chaves, na subestação Maracanaú II, associada à Linha de Transmissão 230 kV Cauípe – Maracanaú II C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MARIMBONDO | TT 13,8/0,12 kV MARIMBONDO TR9 MG | RB | FT TR 500/345 kV MARIMBONDO TR9 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MARIMBONDO | TR 500/345 kV MARIMBONDO TRR1 MG | RB | FT TR 500/345 kV MARIMBONDO TRR1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$609,828.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MARIMBONDO | TR 500/345 kV MARIMBONDO TRR1 MG | RB | FT TR 500/345 kV MARIMBONDO TRR1 MG | 062/2001 | IPCA | RMELP | DSP 1108/2024 | R$ 2,367,957.22 | 6/1/2025 | Prevista | T2024-097 | Obra de Substituição Completa: Substituição do transformador reserva TRR1-AT98V (nº serie: K547267, cod. mat.: 10182631) na SE Marimbondo. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia | MARIMBONDO | TR 500/345 kV MARIMBONDO TR9 MG | RB | FT TR 500/345 kV MARIMBONDO TR9 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,828,419.99 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MARIMBONDO | TR 500/345 kV MARIMBONDO TR9 MG | RB | FT TR 500/345 kV MARIMBONDO TR9 MG | 062/2001 | IPCA | RMELP | REA 15273/2024 | R$ 7,103,559.15 | 6/1/2025 | Prevista | T2024-081 | Obra de Substituição Completa: Substituição de trafo potencia AT09 500/345KV FASE A, B e C, na SE MARIMBONDO 500 kV. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia | MARIMBONDO | RTB 500 kV 100 Mvar MARIMBONDO RT4 MG | RB | FT RTB 500 kV 100 MVAr MARIMBONDO RT4 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$643,613.12 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MARIMBONDO | RTB 13,8 kV 50 Mvar MARIMBONDO RT2 MG | RB | FT RTB 13,8 kV 50 Mvar MARIMBONDO RT2 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$177,554.19 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MARIMBONDO | RTB 13,8 kV 50 Mvar MARIMBONDO RT2 MG | RB | FT RTB 13,8 kV 50 Mvar MARIMBONDO RT2 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$681,342.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MARIMBONDO | RTB 13,8 kV 50 Mvar MARIMBONDO RT1 MG | RB | FT RTB 13,8 kV 50 Mvar MARIMBONDO RT1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$177,554.19 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MARIMBONDO | RTB 13,8 kV 50 Mvar MARIMBONDO RT1 MG | RB | FT RTB 13,8 kV 50 Mvar MARIMBONDO RT1 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$681,342.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MARIMBONDO | MG 500 kV MARIMBONDO MG1 MG | RB | FT MG 500 kV MARIMBONDO MG1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,971,106.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MARIMBONDO | MG 500 kV MARIMBONDO MG1 MG | RB | FT MG 500 kV MARIMBONDO MG1 MG | 062/2001 | IPCA | RBNI | REA 4347/2013 | 7/6/2015 | 3/29/2041 | R$17,596.18 | 6/1/2025 | Ativa | Substituição RDP 345 kV LT 345 kV Porto Colômbia * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MARIMBONDO | MG 500 kV MARIMBONDO MG1 MG | RB | FT MG 500 kV MARIMBONDO MG1 MG | 062/2001 | IPCA | RBNI | REA 6787/2017 | 11/13/2020 | 8/4/2049 | R$151,548.36 | 6/1/2025 | Ativa | T2017-075 | Módulo de infraestrutura para instalação de um disjuntor entre ELs 500 kV na SE Marimbondo. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | MARIMBONDO | MG 500 kV MARIMBONDO MG1 MG | RB | FT MG 500 kV MARIMBONDO MG1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/31/2017 | 3/27/2033 | R$1,719.29 | 6/1/2025 | Ativa | Substituição de IHMs do Sistema de Supervisão e Controle Local (SAGE) por obsolescência ou por atualização tecnológica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MARIMBONDO | MG 500 kV MARIMBONDO MG1 MG | RB | FT MG 500 kV MARIMBONDO MG1 MG | 062/2001 | IPCA | RMEL | REN 443/2011 | 7/13/2017 | 4/8/2032 | R$44,828.25 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MARIMBONDO | MG 500 kV MARIMBONDO MG1 MG | RB | FT MG 500 kV MARIMBONDO MG1 MG | 062/2001 | IPCA | RBNI | REA 5861/2016 | 12/21/2017 | 2/15/2035 | R$18,605.52 | 6/1/2025 | Ativa | Adequação nos Serviços auxiliares de corrente contínua (CC) do sistema de telecomunicações, visando aumento de confiabilidade e disponibilidade, como consequencia o aumento da segurança operacional do SIN * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 * Receita alterada no recurso contra a REH 2.407/2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MARIMBONDO | MG 500 kV MARIMBONDO MG1 MG | RB | FT MG 500 kV MARIMBONDO MG1 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/11/2021 | 8/31/2041 | R$113,157.71 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | MARIMBONDO | MC 500 kV TR 500/345 kV MARIMBONDO TR9 MG | RB | FT TR 500/345 kV MARIMBONDO TR9 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MARIMBONDO | MC 500 kV TR 500/345 kV MARIMBONDO TR9 MG | RB | FT TR 500/345 kV MARIMBONDO TR9 MG | 062/2001 | IPCA | RBNI | REA 5861/2016 | 1/26/2020 | 1/25/2035 | R$196,168.75 | 6/1/2025 | Ativa | Banco de Autotrafos AT09 525/345/13.8 kV - 560 MVA - Modernização dos relés de proteção, devendo este ser estendido aos sistemas de comando, controle, supervisão, assim como os serviços auxiliares * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MARIMBONDO | MC 500 kV TR 500/345 kV MARIMBONDO TR9 MG | RB | FT TR 500/345 kV MARIMBONDO TR9 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/21/2021 | 10/18/2053 | R$360,540.28 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | MARIMBONDO | MC 500 kV TR 13,8/500 kV MARIMBONDO TRG8 MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | MARIMBONDO | MC 500 kV TR 13,8/500 kV MARIMBONDO TRG8 MG | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,518,075.87 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | MARIMBONDO | MC 500 kV TR 13,8/500 kV MARIMBONDO TRG8 MG | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,627,458.60 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | MARIMBONDO | MC 500 kV TR 13,8/500 kV MARIMBONDO TRG8 MG | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/4/2022 | 6/20/2052 | R$586,026.85 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | MARIMBONDO | MC 500 kV TR 13,8/500 kV MARIMBONDO TRG7 MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | MARIMBONDO | MC 500 kV TR 13,8/500 kV MARIMBONDO TRG7 MG | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 2/25/2021 | 8/10/2051 | R$571,213.67 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | MARIMBONDO | MC 500 kV TR 13,8/500 kV MARIMBONDO TRG6 MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | MARIMBONDO | MC 500 kV TR 13,8/500 kV MARIMBONDO TRG6 MG | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/9/2021 | 3/14/2052 | R$616,455.81 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | MARIMBONDO | MC 500 kV TR 13,8/500 kV MARIMBONDO TRG5 MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | MARIMBONDO | MC 500 kV TR 13,8/500 kV MARIMBONDO TRG5 MG | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/27/2020 | 1/2/2051 | R$598,895.19 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | MARIMBONDO | MC 500 kV TR 13,8/500 kV MARIMBONDO TRG4 MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | MARIMBONDO | MC 500 kV TR 13,8/500 kV MARIMBONDO TRG4 MG | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 4/19/2021 | 1/25/2049 | R$217,832.09 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | MARIMBONDO | MC 500 kV TR 13,8/500 kV MARIMBONDO TRG3 MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | MARIMBONDO | MC 500 kV TR 13,8/500 kV MARIMBONDO TRG3 MG | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/4/2021 | 8/17/2051 | R$571,914.20 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | MARIMBONDO | MC 500 kV TR 13,8/500 kV MARIMBONDO TRG2 MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | MARIMBONDO | MC 500 kV TR 13,8/500 kV MARIMBONDO TRG2 MG | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/13/2021 | 11/30/2051 | R$581,780.16 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | MARIMBONDO | MC 500 kV TR 13,8/500 kV MARIMBONDO TRG1 MG | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | MARIMBONDO | MC 500 kV TR 13,8/500 kV MARIMBONDO TRG1 MG | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/2/2020 | 8/8/2041 | R$ 1,038,986.34 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | MARIMBONDO | MC 500 kV RTB 500 kV 100 Mvar MARIMBONDO RT4 MG | RB | FT RTB 500 kV 100 MVAr MARIMBONDO RT4 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$370,400.74 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MARIMBONDO | MC 345 kV TR 500/345 kV MARIMBONDO TR9 MG | RB | FT TR 500/345 kV MARIMBONDO TR9 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$249,483.20 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MARIMBONDO | MC 345 kV TR 500/345 kV MARIMBONDO TR9 MG | RB | FT TR 500/345 kV MARIMBONDO TR9 MG | 062/2001 | IPCA | RBNI | REA 5861/2016 | 1/26/2020 | 1/25/2035 | R$184,964.09 | 6/1/2025 | Ativa | Banco de Autotrafos AT09 525/345/13.8 kV - 560 MVA - Modernização dos relés de proteção, devendo este ser estendido aos sistemas de comando, controle, supervisão, assim como os serviços auxiliares * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MARIMBONDO | MC 13,8 kV TT 13,8/0,12 kV MARIMBONDO TR9 MG | RB | FT TR 500/345 kV MARIMBONDO TR9 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MARIMBONDO | MC 13,8 kV RTB 13,8 kV 50 Mvar MARIMBONDO RT2 MG | RB | FT RTB 13,8 kV 50 Mvar MARIMBONDO RT2 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,744.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MARIMBONDO | MC 13,8 kV RTB 13,8 kV 50 Mvar MARIMBONDO RT1 MG | RB | FT RTB 13,8 kV 50 Mvar MARIMBONDO RT1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,744.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MARIMBONDO | IB 500 kV MG 500 kV MARIMBONDO MG1 MG IB4 | RB | FT MG 500 kV MARIMBONDO MG1 MG | 062/2001 | IPCA | RBNI | REA 6787/2017 | 11/13/2020 | 7/2/2051 | R$ 1,548,058.16 | 6/1/2025 | Ativa | T2017-075 | Inclusão de um disjuntor 500 kV na SE Marimbondo entre as ELs de São Simão e Araraquara C2 *(Receita revisada em 03/07/2024) | ||
| AXIA Energia | MARIMBONDO | IB 500 kV MG 500 kV MARIMBONDO MG1 MG IB3 | RB | FT MG 500 kV MARIMBONDO MG1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MARIMBONDO | IB 500 kV MG 500 kV MARIMBONDO MG1 MG IB2 | RB | FT MG 500 kV MARIMBONDO MG1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MARIMBONDO | IB 500 kV MG 500 kV MARIMBONDO MG1 MG IB2 | RB | FT MG 500 kV MARIMBONDO MG1 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/30/2021 | 6/2/2053 | R$437,274.61 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | MARIMBONDO | IB 500 kV MG 500 kV MARIMBONDO MG1 MG IB1 | RB | FT MG 500 kV MARIMBONDO MG1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$419,818.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MARIMBONDO | IB 500 kV MG 500 kV MARIMBONDO MG1 MG IB1 | RB | FT MG 500 kV MARIMBONDO MG1 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 2/5/2022 | 6/3/2054 | R$179,175.73 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | MARIMBONDO | EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG | RB | FT LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MARIMBONDO | EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG | RB | FT LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG | 062/2001 | IPCA | RBNI | REA 7761/2019 | 12/13/2017 | 12/12/2032 | R$11,905.45 | 6/1/2025 | Ativa | RDP - LT 500 KV Marimbondo - Araraquara C2 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MARIMBONDO | EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG | RB | FT LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/31/2020 | 2/14/2051 | R$502,268.37 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | MARIMBONDO | EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG | RB | FT LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MARIMBONDO | EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG | RB | FT LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG | 062/2001 | IPCA | RBNI | REA 7761/2019 | 12/13/2017 | 12/12/2032 | R$11,905.45 | 6/1/2025 | Ativa | RDP - LT 500 KV Marimbondo - Araraquara C1 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MARIMBONDO | EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG | RB | FT LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/2/2021 | 9/4/2052 | R$732,761.42 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | MARIMBONDO | EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP | RB | FT LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$448,227.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MARIMBONDO | EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP | RB | FT LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP | 062/2001 | IPCA | RBNI | REA 7761/2019 | 12/13/2017 | 12/12/2032 | R$11,905.45 | 6/1/2025 | Ativa | RDP - LT 500 KV Marimbondo - Água Vermelha * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MARIMBONDO | EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP | RB | FT LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/12/2020 | 10/31/2050 | R$565,324.39 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| TMT | MARIMBONDO II | RTL 500 kV 136 Mvar MARIMBONDO II RTL3 MG | RB | FT LT 500 kV MARIMBONDO II /ASSIS C-1 MG/SP | 004/2013 | IPCA | RBL | CC 004/2013 | 12/21/2016 | 8/14/2043 | R$ 1,751,186.58 | 6/1/2025 | Ativa | T2013-098 | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| TMT | MARIMBONDO II | RTB 500 kV 45,33 Mvar MARIMBONDO II RTBR4 MG | RB | FT RTB 500 kV 45,33 Mvar MARIMBONDO II RTBR4 MG | 004/2013 | IPCA | RBL | CC 004/2013 | 12/21/2016 | 8/14/2043 | R$583,728.86 | 6/1/2025 | Ativa | T2013-098 | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| TMT | MARIMBONDO II | RTB 500 kV 136 Mvar MARIMBONDO II RTB4 MG | RB | FT RTB 500 kV 136 Mvar MARIMBONDO II RTB4 MG | 004/2013 | IPCA | RBL | CC 004/2013 | 12/21/2016 | 8/14/2043 | R$ 1,751,186.58 | 6/1/2025 | Ativa | T2013-098 | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| TMT | MARIMBONDO II | MC 500 kV RTL 500 kV 136 Mvar MARIMBONDO II RTL3 MG | RB | FT LT 500 kV MARIMBONDO II /ASSIS C-1 MG/SP | 004/2013 | IPCA | RBL | CC 004/2013 | 12/21/2016 | 8/14/2043 | R$217,681.18 | 6/1/2025 | Ativa | T2013-098 | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| TMT | MARIMBONDO II | MC 500 kV RTB 500 kV 136 Mvar MARIMBONDO II RTB4 MG | RB | FT RTB 500 kV 136 Mvar MARIMBONDO II RTB4 MG | 004/2013 | IPCA | RBL | CC 004/2013 | 12/21/2016 | 8/14/2043 | R$915,010.91 | 6/1/2025 | Ativa | T2013-098 | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia | MARIMBONDO II | IB 500 kV MG 500 kV MARIMBONDO II MG4 MG IB6 | RB | FT MG 500 kV MARIMBONDO II MG4 MG | 062/2001 | IPCA | RBNI | REA 8887/2020 | 8/28/2017 | 12/31/2042 | R$171,994.14 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de uma interligação de barramentos em 500 kV associada ao seccionamento das LTs 500 kV Marimbondo - Araraquara C1 e C2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MARIMBONDO II | IB 500 kV MG 500 kV MARIMBONDO II MG4 MG IB5 | RB | FT MG 500 kV MARIMBONDO II MG4 MG | 062/2001 | IPCA | RBNI | REA 8887/2020 | 8/28/2017 | 12/31/2042 | R$171,994.14 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de uma interligação de barramentos em 500 kV associada ao seccionamento das LTs 500 kV Marimbondo - Araraquara C1 e C2. *(Receita revisada em 03/07/2024) | |||
| TMT | MARIMBONDO II | IB 500 kV MG 500 kV MARIMBONDO II MG2 MG IB3 | RB | FT MG 500 kV MARIMBONDO II MG2 MG | 004/2013 | IPCA | RBL | CC 004/2013 | 12/21/2016 | 8/14/2043 | R$ 1,045,917.68 | 6/1/2025 | Ativa | T2013-098 | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| TMT | MARIMBONDO II | EL 500 kV MARIMBONDO II LT 500 kV MARIMBONDO II /ASSIS C-1 MG/SP | RB | FT LT 500 kV MARIMBONDO II /ASSIS C-1 MG/SP | 004/2013 | IPCA | RBL | CC 004/2013 | 12/21/2016 | 8/14/2043 | R$ 1,105,526.09 | 6/1/2025 | Ativa | T2013-098 | * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia | MARIMBONDO II | EL 500 kV MARIMBONDO II LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP | RB | FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP | 062/2001 | IPCA | RBNI | REA 8887/2020 | 8/28/2017 | 12/31/2042 | R$159,880.20 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 500 kV, arranjo disjuntor e meio, na Subestação Marimbondo II, associada ao seccionamento das LTs 500 kV Marimbondo - Araraquara C1 e C2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MARIMBONDO II | EL 500 kV MARIMBONDO II LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP | RB | FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP | 062/2001 | IPCA | RBNI | REA 8887/2020 | 8/29/2017 | 12/31/2042 | R$159,880.20 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 500 kV, arranjo disjuntor e meio, na Subestação Marimbondo II, associada ao seccionamento das LTs 500 kV Marimbondo - Araraquara C1 e C2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MARIMBONDO II | EL 500 kV MARIMBONDO II LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG | RB | FT LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG | 062/2001 | IPCA | RBNI | REA 8887/2020 | 8/28/2017 | 12/31/2042 | R$159,880.20 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 500 kV, arranjo disjuntor e meio, na Subestação Marimbondo II, associada ao seccionamento das LTs 500 kV Marimbondo - Araraquara C1 e C2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MARIMBONDO II | EL 500 kV MARIMBONDO II LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG | RB | FT LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG | 062/2001 | IPCA | RBNI | REA 8887/2020 | 7/21/2017 | 12/31/2042 | R$159,880.20 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 500 kV, arranjo disjuntor e meio, na Subestação Marimbondo II, associada ao seccionamento das LTs 500 kV Marimbondo - Araraquara C1 e C2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | MARMELEIRO 2 | RTL 525 kV 33,33 Mvar MARMELEIRO 2 RTR1 RS | RB | FT RTL 525 kV 33,33 Mvar MARMELEIRO 2 RTR1 RS | 020/2012 | IPCA | RBL | CC 020/2012 | 12/19/2014 | 8/27/2042 | R$673,030.40 | 6/1/2025 | Ativa | T2012-080-A | Contrato de Concessão nº020/2012 - RB * Receita revisada no reajuste da RAP do ciclo 2018-2019. * Receita revisada em 07-11-2023 | ||
| AXIA Energia Sul | MARMELEIRO 2 | RTL 525 kV 100 Mvar MARMELEIRO 2 RT1 RS | RB | FT LT 525 kV POVO NOVO /MARMELEIRO 2 C-1 RS | 020/2012 | IPCA | RBL | CC 020/2012 | 12/19/2014 | 8/27/2042 | R$ 2,019,093.45 | 6/1/2025 | Ativa | T2012-080-A | Contrato de Concessão nº020/2012 - RB * Receita revisada no reajuste da RAP do ciclo 2018-2019. * Receita revisada em 07-11-2023 | ||
| AXIA Energia Sul | MARMELEIRO 2 | RTB 525 kV 100 Mvar MARMELEIRO 2 RT2 RS | RB | FT RTB 525 kV 100 Mvar MARMELEIRO 2 RT2 RS | 020/2012 | IPCA | RBL | CC 020/2012 | 12/19/2014 | 8/27/2042 | R$ 2,019,093.45 | 6/1/2025 | Ativa | T2012-080-A | Contrato de Concessão nº020/2012 - RB * Receita revisada no reajuste da RAP do ciclo 2018-2019. * Receita revisada em 07-11-2023 | ||
| AXIA Energia Sul | MARMELEIRO 2 | MG 525 kV MARMELEIRO 2 MG1 RS | RB | FT MG 525 kV MARMELEIRO 2 MG1 RS | 020/2012 | IPCA | RBL | CC 020/2012 | 12/19/2014 | 8/27/2042 | R$ 2,153,704.91 | 6/1/2025 | Ativa | T2012-080-A | Contrato de Concessão nº020/2012 - RB * Receita revisada no reajuste da RAP do ciclo 2018-2019. * Receita revisada em 07-11-2023 | ||
| AXIA Energia Sul | MARMELEIRO 2 | MC 525 kV RTL 525 kV 100 Mvar MARMELEIRO 2 RT1 RS | RB | FT LT 525 kV POVO NOVO /MARMELEIRO 2 C-1 RS | 020/2012 | IPCA | RBL | CC 020/2012 | 12/19/2014 | 8/27/2042 | R$755,765.09 | 6/1/2025 | Ativa | T2012-080-A | Contrato de Concessão nº020/2012 - RB * Receita revisada no reajuste da RAP do ciclo 2018-2019. * Receita revisada em 07-11-2023 | ||
| AXIA Energia Sul | MARMELEIRO 2 | MC 525 kV RTB 525 kV 100 Mvar MARMELEIRO 2 RT2 RS | RB | FT RTB 525 kV 100 Mvar MARMELEIRO 2 RT2 RS | 020/2012 | IPCA | RBL | CC 020/2012 | 12/19/2014 | 8/27/2042 | R$ 1,171,927.40 | 6/1/2025 | Ativa | T2012-080-A | Contrato de Concessão nº020/2012 - RB * Receita revisada no reajuste da RAP do ciclo 2018-2019. * Receita revisada em 07-11-2023 | ||
| AXIA Energia Sul | MARMELEIRO 2 | MC 525 kV CS 200/-200 Mvar MARMELEIRO 2 CS1 RS | RB | FT CS 200/-200 Mvar MARMELEIRO 2 CS1 RS | 020/2012 | IPCA | RBL | CC 020/2012 | 12/19/2014 | 8/27/2042 | R$ 4,606,801.28 | 6/1/2025 | Ativa | T2012-080-A | Contrato de Concessão nº020/2012 - RB * Receita revisada no reajuste da RAP do ciclo 2018-2019. * Receita revisada em 07-11-2023 | ||
| AXIA Energia Sul | MARMELEIRO 2 | IB 525 kV MG 525 kV MARMELEIRO 2 MG1 RS IB2 | RB | FT MG 525 kV MARMELEIRO 2 MG1 RS | 020/2012 | IPCA | RBL | CC 020/2012 | 12/19/2014 | 8/27/2042 | R$ 1,330,908.26 | 6/1/2025 | Ativa | T2012-080-A | Contrato de Concessão nº020/2012 - RB * Receita revisada no reajuste da RAP do ciclo 2018-2019. * Receita revisada em 07-11-2023 | ||
| AXIA Energia Sul | MARMELEIRO 2 | IB 525 kV MG 525 kV MARMELEIRO 2 MG1 RS IB1 | RB | FT MG 525 kV MARMELEIRO 2 MG1 RS | 020/2012 | IPCA | RBL | CC 020/2012 | 12/19/2014 | 8/27/2042 | R$ 1,330,908.26 | 6/1/2025 | Ativa | T2012-080-A | Contrato de Concessão nº020/2012 - RB * Receita revisada no reajuste da RAP do ciclo 2018-2019. * Receita revisada em 07-11-2023 | ||
| AXIA Energia Sul | MARMELEIRO 2 | EL 525 kV MARMELEIRO 2 LT 525 kV POVO NOVO /MARMELEIRO 2 C-1 RS | RB | FT LT 525 kV POVO NOVO /MARMELEIRO 2 C-1 RS | 020/2012 | IPCA | RBL | CC 020/2012 | 12/19/2014 | 8/27/2042 | R$ 1,413,681.00 | 6/1/2025 | Ativa | T2012-080-A | Contrato de Concessão nº020/2012 - RB * Receita revisada no reajuste da RAP do ciclo 2018-2019. * Receita revisada em 07-11-2023 | ||
| AXIA Energia Sul | MARMELEIRO 2 | EL 525 kV MARMELEIRO 2 LT 525 kV MARMELEIRO 2 /STA V.PALMAR C-1 RS | RB | FT LT 525 kV MARMELEIRO 2 /STA V.PALMAR C-1 RS | 020/2012 | IPCA | RBL | CC 020/2012 | 12/19/2014 | 8/27/2042 | R$ 1,413,681.00 | 6/1/2025 | Ativa | T2012-080-A | Contrato de Concessão nº020/2012 - RB * Receita revisada no reajuste da RAP do ciclo 2018-2019. * Receita revisada em 07-11-2023 | ||
| AXIA Energia Sul | MARMELEIRO 2 | CS 200/-200 Mvar MARMELEIRO 2 CS1 RS | RB | FT CS 200/-200 Mvar MARMELEIRO 2 CS1 RS | 020/2012 | IPCA | RBL | CC 020/2012 | 12/19/2014 | 8/27/2042 | R$ 16,194,125.04 | 6/1/2025 | Ativa | T2012-080-A | Contrato de Concessão nº020/2012 - RB * Receita revisada no reajuste da RAP do ciclo 2018-2019. * Receita revisada em 07-11-2023 | ||
| AXIA Energia Nordeste | MATATU | TT 69/0 kV MATATU TA2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | TT 69/0 kV MATATU TA2 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$248,222.69 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | TT 69/0 kV MATATU TA2 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$228,831.00 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | TT 69/0 kV MATATU TA2 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2021 | 1/4/2051 | R$ 830.69 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MATATU | TT 69/0 kV MATATU TA1 BA | DIT | 061/2001 | IPCA | RCDM | REA 7806/2019 | 12/3/2021 | 12/29/2051 | R$385,177.24 | 6/1/2025 | Ativa | T2019-002 | Obra de Substituição Completa - Substituição do TA1 por outro transformador de aterramento de 15 MVA, devido a instalação do quarto transformador 230/69 kV, 100MVA. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MATATU | TR 230/69 kV MATATU TR4 BA | RBF | FT TR 230/69 kV MATATU TR4 BA | 061/2001 | IPCA | RBNI | REA 7806/2019 | 10/20/2021 | 2/8/2056 | R$ 2,196,173.05 | 6/1/2025 | Ativa | T2019-002 | Instalação do quarto transformador 230/69 kV - 100 MVA, na SE Matatu. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MATATU | TR 230/69 kV MATATU TR3 BA | RBF | FT TR 230/69 kV MATATU TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | TR 230/69 kV MATATU TR3 BA | RBF | FT TR 230/69 kV MATATU TR3 BA | 061/2001 | IPCA | RMELP | REA 9918/2021 | R$ 1,865,740.76 | 6/1/2025 | Prevista | T2020-016 | Obra de Substituição Completa - Substituição do transformador trifásico TR3 230/69 kV - 100 MVA da Subestação Matatu. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. | ||||
| AXIA Energia Nordeste | MATATU | TR 230/69 kV MATATU TR2 BA | RBF | FT TR 230/69 kV MATATU TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | TR 230/69 kV MATATU TR2 BA | RBF | FT TR 230/69 kV MATATU TR2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/1/2021 | 12/10/2055 | R$67,007.00 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MATATU | TR 230/69 kV MATATU TR1 BA | RBF | FT TR 230/69 kV MATATU TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | TR 230/69 kV MATATU TR1 BA | RBF | FT TR 230/69 kV MATATU TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | TR 230/69 kV MATATU TR1 BA | RBF | FT TR 230/69 kV MATATU TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$913,997.96 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | TR 230/69 kV MATATU TR1 BA | RBF | FT TR 230/69 kV MATATU TR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/14/2021 | 12/23/2055 | R$19,797.12 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MATATU | TR 230/11,9 kV MATATU TRR1 BA | RBF | FT TR 230/11,9 kV MATATU TRR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$213,042.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | TR 230/11,9 kV MATATU TR5 BA | RBF | FT TR 230/11,9 kV MATATU TR5 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$213,042.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | TR 230/11,9 kV MATATU TR5 BA | RBF | FT TR 230/11,9 kV MATATU TR5 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$597,834.30 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | TR 230/11,9 kV MATATU TR5 BA | RBF | FT TR 230/11,9 kV MATATU TR5 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$551,130.18 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | TR 230/11,9 kV MATATU TR5 BA | RBF | FT TR 230/11,9 kV MATATU TR5 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 2/2/2016 | 2/4/2046 | R$10,485.18 | 6/1/2025 | Ativa | Substituição de Isoladores de Chaves Seccionadoras 230KV * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MATATU | TR 230/11,9 kV MATATU TR4 BA | RBF | FT TR 230/11,9 kV MATATU TR4 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$213,042.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | TR 230/11,9 kV MATATU TR4 BA | RBF | FT TR 230/11,9 kV MATATU TR4 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$597,834.30 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | TR 230/11,9 kV MATATU TR4 BA | RBF | FT TR 230/11,9 kV MATATU TR4 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$551,130.18 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | TR 230/11,9 kV MATATU TR4 BA | RBF | FT TR 230/11,9 kV MATATU TR4 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/6/2020 | 12/14/2054 | R$ 700.96 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MATATU | MG 230 kV MATATU MG1 BA | RB | FT MG 230 kV MATATU MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$648,423.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MG 230 kV MATATU MG1 BA | RB | FT MG 230 kV MATATU MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/20/2015 | 12/19/2043 | R$17,629.35 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SWITCH.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MATATU | MG 230 kV MATATU MG1 BA | RB | FT MG 230 kV MATATU MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,819,584.86 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MG 230 kV MATATU MG1 BA | RB | FT MG 230 kV MATATU MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,677,434.92 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MG 230 kV MATATU MG1 BA | RB | FT MG 230 kV MATATU MG1 BA | 061/2001 | IPCA | RBNI | REA 7806/2019 | 10/20/2021 | 9/12/2050 | R$225,133.25 | 6/1/2025 | Ativa | T2019-002 | Complementação do módulo geral com um módulo de infraestrutura em 230 kV, devido à instalação do quarto transformador 230/69 kV, 100 MVA, na SE Matatu. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MATATU | MG 230 kV MATATU MG1 BA | RB | FT MG 230 kV MATATU MG1 BA | 061/2001 | IPCA | RBNI | REA 7806/2019 | 10/20/2021 | 11/5/2049 | R$65,055.24 | 6/1/2025 | Ativa | T2019-002 | Complementação do módulo geral com um módulo de infraestrutura em 69 kV, devido à instalação do quarto transformador 230/69 kV, 100 MVA, na SE Matatu. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MATATU | MG 230 kV MATATU MG1 BA | RB | FT MG 230 kV MATATU MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/23/2019 | 12/13/2038 | R$282,532.31 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MATATU | MC 69 kV TT 69/0 kV MATATU TA2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | MC 69 kV TT 69/0 kV MATATU TA2 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/5/2022 | 6/4/2050 | R$49,175.96 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MATATU | MC 69 kV TT 69/0 kV MATATU TA1 BA | DIT | 061/2001 | IPCA | RCDM | REA 7806/2019 | 12/3/2021 | 8/15/2041 | R$108,271.50 | 6/1/2025 | Ativa | T2019-002 | Conexão do transformador de aterramento devido a implantação do quarto transformador 230/69 kV, 100 MVA, na SE Matatu. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MATATU | MC 69 kV TR 230/69 kV MATATU TR4 BA | RBF | FT TR 230/69 kV MATATU TR4 BA | 061/2001 | IPCA | RBNI | REA 7806/2019 | 10/20/2021 | 7/1/2051 | R$533,640.94 | 6/1/2025 | Ativa | T2019-002 | Instalação, na SE MATATU, de um módulo de conexão, em 69 kV, para o autotransformador TR 230/69 kV MATATU TR4 BA *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MATATU | MC 69 kV TR 230/69 kV MATATU TR3 BA | RBF | FT TR 230/69 kV MATATU TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 69 kV TR 230/69 kV MATATU TR3 BA | RBF | FT TR 230/69 kV MATATU TR3 BA | 061/2001 | IPCA | RBNI | REA 3578/2012 | 11/25/2019 | 11/24/2052 | R$68,066.83 | 6/1/2025 | Ativa | Substituição do disjuntor: 12-T3 - vão TR 04T3 230/69 kV * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MATATU | MC 69 kV TR 230/69 kV MATATU TR3 BA | RBF | FT TR 230/69 kV MATATU TR3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/20/2021 | 1/19/2045 | R$7,753.73 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MATATU | MC 69 kV TR 230/69 kV MATATU TR2 BA | RBF | FT TR 230/69 kV MATATU TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 69 kV TR 230/69 kV MATATU TR2 BA | RBF | FT TR 230/69 kV MATATU TR2 BA | 061/2001 | IPCA | RBNI | REA 3578/2012 | 11/25/2019 | 11/24/2052 | R$68,066.83 | 6/1/2025 | Ativa | Substituição do disjuntor: 12-T2 - vão TR 04T2 230/69 kV; e * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MATATU | MC 69 kV TR 230/69 kV MATATU TR2 BA | RBF | FT TR 230/69 kV MATATU TR2 BA | 061/2001 | IPCA | RBNI | REA 2837/2011 | 11/25/2019 | 11/27/2049 | R$15,142.62 | 6/1/2025 | Ativa | Substituição da chave seccionadora 32T2-4 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MATATU | MC 69 kV TR 230/69 kV MATATU TR1 BA | RBF | FT TR 230/69 kV MATATU TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 69 kV TR 230/69 kV MATATU TR1 BA | RBF | FT TR 230/69 kV MATATU TR1 BA | 061/2001 | IPCA | RBNI | REA 3578/2012 | 11/25/2019 | 11/24/2052 | R$68,066.83 | 6/1/2025 | Ativa | Substituição do disjuntor: 12-T1 - vão TR 04T1 230/69 kV; * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MATATU | MC 69 kV TR 230/69 kV MATATU TR1 BA | RBF | FT TR 230/69 kV MATATU TR1 BA | 061/2001 | IPCA | RBNI | REA 2837/2011 | 2/2/2020 | 2/4/2050 | R$30,453.53 | 6/1/2025 | Ativa | Substituição das chaves seccionadoras 32T1-4 e 32T1-5 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MATATU | MC 69 kV BC 69 kV 27,1 Mvar MATATU BC1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | MC 69 kV BC 69 kV 27,1 Mvar MATATU BC1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | MC 69 kV BC 69 kV 27,1 Mvar MATATU BC1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$186,873.52 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | MC 69 kV BC 69 kV 27,1 Mvar MATATU BC1 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/13/2022 | 6/12/2050 | R$47,603.20 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MATATU | MC 4,16 kV TR 230/11,9 kV MATATU TR5 BA | RBF | FT TR 230/11,9 kV MATATU TR5 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 4,16 kV TR 230/11,9 kV MATATU TR5 BA | RBF | FT TR 230/11,9 kV MATATU TR5 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$125,341.16 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 4,16 kV TR 230/11,9 kV MATATU TR4 BA | RBF | FT TR 230/11,9 kV MATATU TR4 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 4,16 kV TR 230/11,9 kV MATATU TR4 BA | RBF | FT TR 230/11,9 kV MATATU TR4 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$125,341.16 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 4,16 kV CS 20/-10 Mvar MATATU CS2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$60,394.36 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | MC 4,16 kV CS 20/-10 Mvar MATATU CS2 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$169,476.78 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | MC 4,16 kV CS 20/-10 Mvar MATATU CS1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$60,394.36 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | MC 4,16 kV CS 20/-10 Mvar MATATU CS1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$169,476.78 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | MC 230 kV TR 230/69 kV MATATU TR4 BA | RBF | FT TR 230/69 kV MATATU TR4 BA | 061/2001 | IPCA | RBNI | REA 7806/2019 | 10/20/2021 | 5/4/2051 | R$ 1,574,323.24 | 6/1/2025 | Ativa | T2019-002 | Instalação, na SE MATATU, de um módulo de conexão, em 230 kV, para o autotransformador TR 230/69 kV MATATU TR4 BA *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MATATU | MC 230 kV TR 230/69 kV MATATU TR3 BA | RBF | FT TR 230/69 kV MATATU TR3 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 230 kV TR 230/69 kV MATATU TR3 BA | RBF | FT TR 230/69 kV MATATU TR3 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$410,719.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 230 kV TR 230/69 kV MATATU TR3 BA | RBF | FT TR 230/69 kV MATATU TR3 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$378,633.35 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 230 kV TR 230/69 kV MATATU TR3 BA | RBF | FT TR 230/69 kV MATATU TR3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/8/2022 | 4/26/2041 | R$137,776.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MATATU | MC 230 kV TR 230/69 kV MATATU TR2 BA | RBF | FT TR 230/69 kV MATATU TR2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 230 kV TR 230/69 kV MATATU TR2 BA | RBF | FT TR 230/69 kV MATATU TR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$410,719.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 230 kV TR 230/69 kV MATATU TR2 BA | RBF | FT TR 230/69 kV MATATU TR2 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$378,633.35 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 230 kV TR 230/69 kV MATATU TR2 BA | RBF | FT TR 230/69 kV MATATU TR2 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 4/10/2016 | 4/9/2040 | R$19,219.45 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE PARARAIOS, POSIÇÃO 74T2 FASE A,B e C DA SUB MATATU * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MATATU | MC 230 kV TR 230/69 kV MATATU TR2 BA | RBF | FT TR 230/69 kV MATATU TR2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/13/2022 | 11/13/2038 | R$164,045.29 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MATATU | MC 230 kV TR 230/69 kV MATATU TR1 BA | RBF | FT TR 230/69 kV MATATU TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 230 kV TR 230/69 kV MATATU TR1 BA | RBF | FT TR 230/69 kV MATATU TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$410,719.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 230 kV TR 230/69 kV MATATU TR1 BA | RBF | FT TR 230/69 kV MATATU TR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$378,633.35 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 230 kV TR 230/69 kV MATATU TR1 BA | RBF | FT TR 230/69 kV MATATU TR1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 11/27/2016 | 11/30/2046 | R$14,616.89 | 6/1/2025 | Ativa | Substituir 01 TC QDR 245 com alta taxa de falha. Posição Operacional: 94T1-A/MTT * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MATATU | MC 230 kV TR 230/69 kV MATATU TR1 BA | RBF | FT TR 230/69 kV MATATU TR1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 11/27/2016 | 11/30/2046 | R$14,616.89 | 6/1/2025 | Ativa | Substituir 01 TC QDR 245 com alta taxa de falha. Posição Operacional: 94T1-B/MTT * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MATATU | MC 230 kV TR 230/69 kV MATATU TR1 BA | RBF | FT TR 230/69 kV MATATU TR1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 11/27/2016 | 11/30/2046 | R$14,616.89 | 6/1/2025 | Ativa | Substituir 01 TC QDR 245 com alta taxa de falha. Posição Operacional: 94T1-C/MTT * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MATATU | MC 230 kV TR 230/69 kV MATATU TR1 BA | RBF | FT TR 230/69 kV MATATU TR1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 2/2/2016 | 2/4/2046 | R$2,656.34 | 6/1/2025 | Ativa | Substituição de Isoladores de Chaves Seccionadoras 230KV * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MATATU | MC 230 kV TR 230/69 kV MATATU TR1 BA | RBF | FT TR 230/69 kV MATATU TR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/16/2022 | 12/12/2037 | R$143,550.44 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MATATU | MC 230 kV TR 230/11,9 kV MATATU TR5 BA | RBF | FT TR 230/11,9 kV MATATU TR5 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 230 kV TR 230/11,9 kV MATATU TR5 BA | RBF | FT TR 230/11,9 kV MATATU TR5 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$410,719.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 230 kV TR 230/11,9 kV MATATU TR5 BA | RBF | FT TR 230/11,9 kV MATATU TR5 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$378,633.35 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 230 kV TR 230/11,9 kV MATATU TR5 BA | RBF | FT TR 230/11,9 kV MATATU TR5 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/21/2022 | 4/20/2046 | R$17,340.93 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MATATU | MC 230 kV TR 230/11,9 kV MATATU TR4 BA | RBF | FT TR 230/11,9 kV MATATU TR4 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 230 kV TR 230/11,9 kV MATATU TR4 BA | RBF | FT TR 230/11,9 kV MATATU TR4 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$410,719.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 230 kV TR 230/11,9 kV MATATU TR4 BA | RBF | FT TR 230/11,9 kV MATATU TR4 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$378,633.35 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 230 kV TR 230/11,9 kV MATATU TR4 BA | RBF | FT TR 230/11,9 kV MATATU TR4 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 2/2/2016 | 2/4/2046 | R$10,485.18 | 6/1/2025 | Ativa | Substituição de Isoladores de Chaves Seccionadoras 230KV * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MATATU | MC 11,9 kV TR 230/11,9 kV MATATU TR5 BA | RBF | FT TR 230/11,9 kV MATATU TR5 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$48,477.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 11,9 kV TR 230/11,9 kV MATATU TR4 BA | RBF | FT TR 230/11,9 kV MATATU TR4 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$48,477.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 11,9 kV TR 230/11,9 kV MATATU TR4 BA | RBF | FT TR 230/11,9 kV MATATU TR4 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$136,034.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 11,9 kV TR 11,9/0,22 kV MATATU TR7 BA | RB | FT MG 230 kV MATATU MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$48,477.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 11,9 kV TR 11,9/0,22 kV MATATU TR6 BA | RB | FT MG 230 kV MATATU MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$48,477.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 11,9 kV TR 11,9/0,22 kV MATATU TR6 BA | RB | FT MG 230 kV MATATU MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$136,034.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | MC 11,9 kV CS 20/-10 Mvar MATATU CS2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$64,071.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | MC 11,9 kV CS 20/-10 Mvar MATATU CS1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$64,071.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | MC 11,9 kV CS 20/-10 Mvar MATATU CS1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$179,795.32 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | IB 69 kV MG 230 kV MATATU MG1 BA IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | IB 69 kV MG 230 kV MATATU MG1 BA IB1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$118,244.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | IB 69 kV MG 230 kV MATATU MG1 BA IB1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$109,007.13 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | IB 69 kV MG 230 kV MATATU MG1 BA IB1 | DIT | 061/2001 | IPCA | RCDM | REA 7806/2019 | 12/3/2021 | 12/2/2061 | R$24,751.51 | 6/1/2025 | Ativa | T2019-002 | Substituição das chaves seccionadoras e recapacitação da interligação de barramentos, 69kV, devido a implantação do quarto transformador 230/69 kV, 100 MVA, na SE Matatu. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MATATU | IB 69 kV MG 230 kV MATATU MG1 BA IB1 | DIT | 061/2001 | IPCA | RCDM | REA 7806/2019 | 12/3/2021 | 2/14/2052 | R$25,803.76 | 6/1/2025 | Ativa | T2019-002 | Instalação de TPs no barramento de 69 kV da SE Matatu com a instalação do quarto transformador 230/69 kV, 100 MVA. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MATATU | IB 230 kV MG 230 kV MATATU MG1 BA IB1 | RB | FT MG 230 kV MATATU MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,837.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | IB 230 kV MG 230 kV MATATU MG1 BA IB1 | RB | FT MG 230 kV MATATU MG1 BA | 061/2001 | IPCA | RBNI | REA 7806/2019 | 10/20/2021 | 11/21/2053 | R$ 1,094,632.34 | 6/1/2025 | Ativa | T2019-002 | Relocação e instalação de interligação de barramentos, 230 kV, devido a implantação do quarto transformador 230/69 kV, 100 MVA, na SE Matatu. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MATATU | IB 11,9 kV MG 230 kV MATATU MG1 BA IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$30,696.61 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | IB 11,9 kV MG 230 kV MATATU MG1 BA IB1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$86,139.86 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU PITUACU 02J5 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU PITUACU 02J5 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/10/2022 | 12/20/2049 | R$58,010.29 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU LAPINHA 02V7 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU LAPINHA 02V7 | DIT | 061/2001 | IPCA | RCDM | REA 2376/2010 | 4/5/2014 | 4/7/2044 | R$7,639.12 | 6/1/2025 | Ativa | Substituição da seccionadora 32V7-6. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU LAPINHA 02V7 | DIT | 061/2001 | IPCA | RCDM | REA 2376/2010 | 5/10/2014 | 5/12/2044 | R$15,329.71 | 6/1/2025 | Ativa | Substituição da seccionadora 32V7-4, 32V7-5.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU LAPINHA 02V7 | DIT | 061/2001 | IPCA | RCDM | REA 2837/2011 | 12/31/2019 | 12/30/2052 | R$67,819.06 | 6/1/2025 | Ativa | Substituição do disjuntor 12V7 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU LAPINHA 02V7 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/26/2020 | 8/2/2039 | R$83,057.14 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU GRACA 02V6 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU GRACA 02V6 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/12/2020 | 3/21/2049 | R$68,828.24 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU GRACA 02V6 | DIT | 061/2001 | IPCA | RCDM | REA 8314/2019 | 6/13/2022 | 6/15/2052 | R$32,549.92 | 6/1/2025 | Ativa | Substituição de 2 Secccionadoras do vão LT Graça 02V6 (32V6-4 e 32V6-5) . Capacidade do novo equipamento: Capacidade nominal de curto-circuito (kA): > 25 kA Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU DIST2 | DIT | 061/2001 | IPCA | RCDM | REA 2837/2011 | 6/1/2013 | 6/28/2046 | R$31,083.75 | 6/1/2025 | Ativa | Substituição do disjuntor 12V5. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU DIST2 | DIT | 061/2001 | IPCA | RCDM | REA 5484/2015 | 4/11/2014 | 4/13/2044 | R$43,612.11 | 6/1/2025 | Ativa | Substituição de 3 chave(s) seccionadora(s) do(s) vão(s): EL CENTRAL (32V5-4/5/6). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU DIST2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/20/2019 | 2/3/2048 | R$76,750.55 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU DIST2 | DIT | 061/2001 | IPCA | RCDM | REA 5484/2015 | 4/14/2020 | 4/13/2060 | R$17,611.74 | 6/1/2025 | Ativa | Substituição de cabos e bays de conexão do(s) vão(s): - EL CENTRAL (02V5). Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU CENTRAL 02V2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU CENTRAL 02V2 | DIT | 061/2001 | IPCA | RCDM | REA 2837/2011 | 7/30/2019 | 7/29/2052 | R$67,057.22 | 6/1/2025 | Ativa | Substituição do disjuntor 12V2 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU CENTRAL 02V2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/7/2022 | 7/28/2041 | R$95,266.30 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU CANDEAL 02V4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU CANDEAL 02V4 | DIT | 061/2001 | IPCA | RCDM | REA 2376/2010 | 3/22/2014 | 9/25/2046 | R$23,584.80 | 6/1/2025 | Ativa | Substituição da seccionadora 32V4-6. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU CANDEAL 02V4 | DIT | 061/2001 | IPCA | RCDM | REA 2376/2010 | 5/10/2014 | 5/12/2044 | R$22,825.02 | 6/1/2025 | Ativa | Substituição da seccionadora 32V4-4/5. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU CANDEAL 02V4 | DIT | 061/2001 | IPCA | RCDM | REA 2837/2011 | 12/31/2019 | 12/30/2052 | R$67,819.06 | 6/1/2025 | Ativa | Substituição do disjuntor 12V4 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU CANDEAL 02V4 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/4/2021 | 7/16/2040 | R$87,781.36 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU AMARALINA 02V3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU AMARALINA 02V3 | DIT | 061/2001 | IPCA | RCDM | REA 2376/2010 | 5/25/2014 | 5/27/2044 | R$7,675.89 | 6/1/2025 | Ativa | Substituição da seccionadora 32V3-5.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU AMARALINA 02V3 | DIT | 061/2001 | IPCA | RCDM | REA 2376/2010 | 5/25/2014 | 1/20/2047 | R$25,744.13 | 6/1/2025 | Ativa | Substituição da seccionadora 32V3-6 INCLUIDA NO CICLO 2016/2017 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU AMARALINA 02V3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU AMARALINA 02V3 | DIT | 061/2001 | IPCA | RCDM | REA 2376/2010 | 5/25/2014 | 5/24/2047 | R$20,269.78 | 6/1/2025 | Ativa | EL 69 kV MATATU AMARALINA 02V3 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU AMARALINA 02V3 | DIT | 061/2001 | IPCA | RCDM | REA 2837/2011 | 1/30/2020 | 1/29/2053 | R$67,561.98 | 6/1/2025 | Ativa | Substituição do disjuntor 12V3 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MATATU | EL 69 kV MATATU AMARALINA 02V3 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/3/2021 | 12/2/2040 | R$88,363.34 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MATATU | EL 230 kV MATATU LT 230 kV COTEGIPE /MATATU C-1 BA | RB | FT LT 230 kV COTEGIPE /MATATU C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | EL 230 kV MATATU LT 230 kV COTEGIPE /MATATU C-1 BA | RB | FT LT 230 kV COTEGIPE /MATATU C-1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/10/2013 | 11/9/2041 | R$33,733.87 | 6/1/2025 | Ativa | Substituição do sistema de proteção da LT Cotegipe-Matatu 04L4 na SE Matatu, por proteção digital (retrofit) .Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MATATU | EL 230 kV MATATU LT 230 kV COTEGIPE /MATATU C-1 BA | RB | FT LT 230 kV COTEGIPE /MATATU C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/25/2022 | 8/10/2048 | R$348,877.77 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MATATU | EL 230 kV MATATU LT 230 kV CAMACARI II /MATATU C-1 BA | RB | FT LT 230 kV CAMACARI II /MATATU C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MATATU | EL 230 kV MATATU LT 230 kV CAMACARI II /MATATU C-1 BA | RB | FT LT 230 kV CAMACARI II /MATATU C-1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 2/2/2014 | 2/1/2042 | R$34,032.91 | 6/1/2025 | Ativa | Substituição do sistema de proteção da LT Camaçari II-Matatu 04M7 na SE Matatu, por proteção digital (retrofit) Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MATATU | EL 230 kV MATATU LT 230 kV CAMACARI II /MATATU C-1 BA | RB | FT LT 230 kV CAMACARI II /MATATU C-1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 2/13/2015 | 2/12/2039 | R$18,306.58 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE PARARAIOS, POSIÇÃO 74M7 FASES A,B E C DA SE MATATU * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MATATU | EL 230 kV MATATU LT 230 kV CAMACARI II /MATATU C-1 BA | RB | FT LT 230 kV CAMACARI II /MATATU C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/18/2020 | 2/27/2052 | R$291,256.51 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MATATU | EL 11,9 kV MATATU DIST9 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$52,583.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 11,9 kV MATATU DIST9 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$147,558.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 11,9 kV MATATU DIST8 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$52,583.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 11,9 kV MATATU DIST8 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$147,558.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 11,9 kV MATATU DIST8 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/1/2019 | 9/30/2042 | R$13,742.39 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MATATU | EL 11,9 kV MATATU DIST7 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$52,583.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 11,9 kV MATATU DIST7 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$147,558.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 11,9 kV MATATU DIST6 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$52,583.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 11,9 kV MATATU DIST6 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$147,558.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 11,9 kV MATATU DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$52,583.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 11,9 kV MATATU DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$147,558.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 11,9 kV MATATU DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$52,583.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 11,9 kV MATATU DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$147,558.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 11,9 kV MATATU DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$52,583.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 11,9 kV MATATU DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$147,558.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 11,9 kV MATATU DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$52,583.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 11,9 kV MATATU DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$147,558.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 11,9 kV MATATU DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$52,583.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 11,9 kV MATATU DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$147,558.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 11,9 kV MATATU DIS12 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$52,583.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 11,9 kV MATATU DIS12 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$147,558.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 11,9 kV MATATU DIS11 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$52,583.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 11,9 kV MATATU DIS11 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$147,558.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 11,9 kV MATATU DIS10 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$52,583.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | EL 11,9 kV MATATU DIS10 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$147,558.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | CS 20/-10 Mvar MATATU CS2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$767,380.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | CS 20/-10 Mvar MATATU CS1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$767,380.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | BC 69 kV 27,1 Mvar MATATU BC1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$129,156.00 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MATATU | BC 69 kV 27,1 Mvar MATATU BC1 BA | DIT | 061/2001 | IPCA | RCDM | REA 7761/2019 | 5/2/2019 | 5/1/2039 | R$29,900.89 | 6/1/2025 | Ativa | Instalação de reatores limitadores de curto-circuito entre o banco de capacitor 02H1 e o respectivo disjuntor de manobra, 12H1. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | ||||
| Nova Era Integração | MAURITI II | EL 230 kV MAURITI II LT 230 kV MAURITI II /MILAGRES C-2 CE | RB | FT LT 230 kV MAURITI II /MILAGRES C-2 CE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,598,632.39 | 6/1/2025 | Prevista | T2024-197-B | LT 230 kV Araticum (Mauriti) - Milagres - C2 | ||||
| AXIA Energia Nordeste | MESSIAS | TR 69/13,8 kV MESSIAS TR3 AL | RB | FT MG 500 kV MESSIAS MG1 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | TR 69/13,8 kV MESSIAS TR3 AL | RB | FT MG 500 kV MESSIAS MG1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$76,466.27 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | TR 69/13,8 kV MESSIAS TR3 AL | RB | FT MG 500 kV MESSIAS MG1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$70,492.55 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | TR 500/230 kV MESSIAS TRR1 AL | RB | FT TR 500/230 kV MESSIAS TRR1 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$622,465.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | TR 500/230 kV MESSIAS TRR1 AL | RB | FT TR 500/230 kV MESSIAS TRR1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,746,742.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | TR 500/230 kV MESSIAS TRR1 AL | RB | FT TR 500/230 kV MESSIAS TRR1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,610,282.76 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | TR 500/230 kV MESSIAS TR4 AL | RB | FT TR 500/230 kV MESSIAS TR4 AL | 061/2001 | IPCA | RBNI | REA 8328/2019 | 6/12/2023 | 6/11/2058 | R$ 4,494,689.25 | 6/1/2025 | Ativa | T2019-067 | Instalar, na SE MESSIAS, um banco de autotransformadores monofásicos TR3 500/230-13,8 KV - 3x200 MVA. | ||
| AXIA Energia Nordeste | MESSIAS | TR 500/230 kV MESSIAS TR3 AL | RB | FT TR 500/230 kV MESSIAS TR3 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,867,395.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | TR 500/230 kV MESSIAS TR3 AL | RB | FT TR 500/230 kV MESSIAS TR3 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 5,240,226.18 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | TR 500/230 kV MESSIAS TR3 AL | RB | FT TR 500/230 kV MESSIAS TR3 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 4,830,848.29 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | TR 500/230 kV MESSIAS TR2 AL | RB | FT TR 500/230 kV MESSIAS TR2 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,867,395.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | TR 500/230 kV MESSIAS TR2 AL | RB | FT TR 500/230 kV MESSIAS TR2 AL | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/15/2013 | 8/23/2048 | R$67,411.22 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BUCHAS HSP 500 kV TIPO OTF DOS AUTOTRAFOS 05T2 A/B/C E R e SUBSTITUIÇÃO DE BUCHAS HSP 230 KV TIPO OTF DOS AUTOTRAFOS 05T2 A/B E R. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MESSIAS | TR 500/230 kV MESSIAS TR2 AL | RB | FT TR 500/230 kV MESSIAS TR2 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 5,240,226.18 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | TR 500/230 kV MESSIAS TR2 AL | RB | FT TR 500/230 kV MESSIAS TR2 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 4,830,848.29 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | RTL 500 kV 50 Mvar MESSIAS RTR1 AL | RB | FT RTL 500 kV 50 Mvar MESSIAS RTR1 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$257,975.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | RTL 500 kV 50 Mvar MESSIAS RTR1 AL | RB | FT RTL 500 kV 50 Mvar MESSIAS RTR1 AL | 061/2001 | IPCA | RMEL | REN 643/2014 | 2/6/2014 | 1/16/2050 | R$9,496.88 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BUCHAS HSP 500 KV TIPO OTF DO REATOR 05E1R. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MESSIAS | RTL 500 kV 50 Mvar MESSIAS RTR1 AL | RB | FT RTL 500 kV 50 Mvar MESSIAS RTR1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$723,921.48 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | RTL 500 kV 50 Mvar MESSIAS RTR1 AL | RB | FT RTL 500 kV 50 Mvar MESSIAS RTR1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$667,367.15 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | RTL 500 kV 150 Mvar MESSIAS RT1 AL | RB | FT LT 500 kV USINA XINGO /MESSIAS C-1 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$773,925.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | RTL 500 kV 150 Mvar MESSIAS RT1 AL | RB | FT LT 500 kV USINA XINGO /MESSIAS C-1 AL | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/14/2013 | 11/23/2049 | R$28,367.42 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BUCHAS HSP 500 KV TIPO OTF DOS REATORES 05E1 A/B/C. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MESSIAS | RTL 500 kV 150 Mvar MESSIAS RT1 AL | RB | FT LT 500 kV USINA XINGO /MESSIAS C-1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,171,764.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | RTL 500 kV 150 Mvar MESSIAS RT1 AL | RB | FT LT 500 kV USINA XINGO /MESSIAS C-1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 2,002,101.46 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | RTL 500 kV 150 Mvar MESSIAS RT1 AL | RB | FT LT 500 kV USINA XINGO /MESSIAS C-1 AL | 061/2001 | IPCA | RMEL | REA 14107/2023 | 6/15/2023 | 6/14/2059 | R$703,197.30 | 6/1/2025 | Ativa | T2023-050 | Obra de Substituição Parcial - Substituição da Fase A do reator em 500 kV, 50 Mvar, 05E1-A, na SE Messias. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 000035/2018. (Rotina substituição IdeMdl 13567) | ||
| AXIA Energia Nordeste | MESSIAS | MG 500 kV MESSIAS MG1 AL | RB | FT MG 500 kV MESSIAS MG1 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,357,675.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | MG 500 kV MESSIAS MG1 AL | RB | FT MG 500 kV MESSIAS MG1 AL | 061/2001 | IPCA | RMEL | REN 643/2014 | 5/22/2015 | 5/21/2043 | R$41,680.11 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE ACESSO REMOTO A DISPOSITIVOS DE PROTEÇÃO..Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MESSIAS | MG 500 kV MESSIAS MG1 AL | RB | FT MG 500 kV MESSIAS MG1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,809,865.82 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | MG 500 kV MESSIAS MG1 AL | RB | FT MG 500 kV MESSIAS MG1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 3,512,230.80 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | MG 500 kV MESSIAS MG1 AL | RB | FT MG 500 kV MESSIAS MG1 AL | 061/2001 | IPCA | RMEL | REN 443/2011 | 9/26/2016 | 9/25/2033 | R$12,233.52 | 6/1/2025 | Ativa | Implantação de Banco de Baterias * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MESSIAS | MG 500 kV MESSIAS MG1 AL | RB | FT MG 500 kV MESSIAS MG1 AL | 061/2001 | IPCA | RBNI | REA 8328/2019 | 6/12/2023 | 6/11/2054 | R$ 1,016,954.67 | 6/1/2025 | Ativa | T2019-067 | Complemento dos Módulos de Infraestrutura Geral, (500 kV, DJM, e 230 kV, BD4), para conexão do terceiro banco de autotransformadores 500/230-13,8 kV, 3x200 MVA, na SE Messias. | ||
| AXIA Energia Nordeste | MESSIAS | MG 500 kV MESSIAS MG1 AL | RB | FT MG 500 kV MESSIAS MG1 AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/23/2018 | 11/10/2034 | R$509,570.07 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MESSIAS | MC 69 kV TR 69/13,8 kV MESSIAS TR3 AL | RB | FT MG 500 kV MESSIAS MG1 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | MC 500 kV TR 500/230 kV MESSIAS TR4 AL | RB | FT TR 500/230 kV MESSIAS TR4 AL | 061/2001 | IPCA | RBNI | REA 8328/2019 | 6/12/2023 | 6/11/2052 | R$ 1,757,368.12 | 6/1/2025 | Ativa | T2019-067 | Instalar, na SE MESSIAS, um módulo de conexão, em 500 kV, para o banco de autotransformadores monofásicos TR3 500/230 kV - 600 MVA, arranjo Disjuntor e Meio. | ||
| AXIA Energia Nordeste | MESSIAS | MC 500 kV TR 500/230 kV MESSIAS TR3 AL | RB | FT TR 500/230 kV MESSIAS TR3 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$414,502.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | MC 500 kV TR 500/230 kV MESSIAS TR3 AL | RB | FT TR 500/230 kV MESSIAS TR3 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,163,163.61 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | MC 500 kV TR 500/230 kV MESSIAS TR3 AL | RB | FT TR 500/230 kV MESSIAS TR3 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,072,294.74 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | MC 500 kV TR 500/230 kV MESSIAS TR3 AL | RB | FT TR 500/230 kV MESSIAS TR3 AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2018 | 12/30/2046 | R$1,481.77 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MESSIAS | MC 500 kV TR 500/230 kV MESSIAS TR2 AL | RB | FT TR 500/230 kV MESSIAS TR2 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$414,502.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | MC 500 kV TR 500/230 kV MESSIAS TR2 AL | RB | FT TR 500/230 kV MESSIAS TR2 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,163,163.61 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | MC 500 kV TR 500/230 kV MESSIAS TR2 AL | RB | FT TR 500/230 kV MESSIAS TR2 AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2018 | 12/30/2046 | R$1,481.77 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MESSIAS | MC 500 kV RTL 500 kV 150 Mvar MESSIAS RT1 AL | RB | FT LT 500 kV USINA XINGO /MESSIAS C-1 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$251,123.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | MC 500 kV RTL 500 kV 150 Mvar MESSIAS RT1 AL | RB | FT LT 500 kV USINA XINGO /MESSIAS C-1 AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2018 | 12/30/2046 | R$ 370.44 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MESSIAS | MC 230 kV TR 500/230 kV MESSIAS TR4 AL | RB | FT TR 500/230 kV MESSIAS TR4 AL | 061/2001 | IPCA | RBNI | REA 8328/2019 | 6/12/2023 | 6/11/2050 | R$ 2,474,573.77 | 6/1/2025 | Ativa | T2019-067 | Instalar, na SE MESSIAS, um módulo de conexão, em 230 kV, para o banco de autotransformadores monofásicos TR3 500/230 kV - 600 MVA, arranjo Barra Dupla a Quatro Chaves. | ||
| AXIA Energia Nordeste | MESSIAS | MC 230 kV TR 500/230 kV MESSIAS TR3 AL | RB | FT TR 500/230 kV MESSIAS TR3 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,694.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | MC 230 kV TR 500/230 kV MESSIAS TR3 AL | RB | FT TR 500/230 kV MESSIAS TR3 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$431,291.40 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | MC 230 kV TR 500/230 kV MESSIAS TR3 AL | RB | FT TR 500/230 kV MESSIAS TR3 AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/21/2019 | 11/23/2049 | R$116,763.01 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MESSIAS | MC 230 kV TR 500/230 kV MESSIAS TR2 AL | RB | FT TR 500/230 kV MESSIAS TR2 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,694.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | MC 230 kV TR 500/230 kV MESSIAS TR2 AL | RB | FT TR 500/230 kV MESSIAS TR2 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$431,291.40 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | MC 230 kV TR 500/230 kV MESSIAS TR2 AL | RB | FT TR 500/230 kV MESSIAS TR2 AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/21/2019 | 11/23/2049 | R$116,763.01 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MESSIAS | MC 13,8 kV TR 69/13,8 kV MESSIAS TR3 AL | RB | FT MG 500 kV MESSIAS MG1 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$48,477.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | MC 13,8 kV TR 69/13,8 kV MESSIAS TR3 AL | RB | FT MG 500 kV MESSIAS MG1 AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/12/2021 | 12/15/2051 | R$5,454.95 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MESSIAS | IB 500 kV MG 500 kV MESSIAS MG1 AL IB3 | RB | FT MG 500 kV MESSIAS MG1 AL | 061/2001 | IPCA | RBNI | REA 8328/2019 | 6/12/2023 | 6/11/2055 | R$ 1,588,265.82 | 6/1/2025 | Ativa | T2019-067 | Instalar, na SE MESSIAS, uma interligação de barramentos IB3, em 500 kV, arranjo Disjuntor e Meio. | ||
| AXIA Energia Nordeste | MESSIAS | IB 500 kV MG 500 kV MESSIAS MG1 AL IB2 | RB | FT MG 500 kV MESSIAS MG1 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$439,875.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | IB 500 kV MG 500 kV MESSIAS MG1 AL IB2 | RB | FT MG 500 kV MESSIAS MG1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,234,365.24 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | IB 500 kV MG 500 kV MESSIAS MG1 AL IB2 | RB | FT MG 500 kV MESSIAS MG1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,137,933.94 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | IB 500 kV MG 500 kV MESSIAS MG1 AL IB1 | RB | FT MG 500 kV MESSIAS MG1 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$439,875.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | IB 500 kV MG 500 kV MESSIAS MG1 AL IB1 | RB | FT MG 500 kV MESSIAS MG1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,234,365.24 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | IB 500 kV MG 500 kV MESSIAS MG1 AL IB1 | RB | FT MG 500 kV MESSIAS MG1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,137,933.94 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | IB 230 kV MG 500 kV MESSIAS MG1 AL IB1 | RB | FT MG 500 kV MESSIAS MG1 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,085.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | IB 230 kV MG 500 kV MESSIAS MG1 AL IB1 | RB | FT MG 500 kV MESSIAS MG1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$373,459.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | IB 230 kV MG 500 kV MESSIAS MG1 AL IB1 | RB | FT MG 500 kV MESSIAS MG1 AL | 061/2001 | IPCA | RBNI | REA 8328/2019 | 6/12/2023 | 6/11/2056 | R$203,764.86 | 6/1/2025 | Ativa | T2019-067 | Substituição das duas chaves seccionadoras daINTERLIGAÇÃO DE BARRA 230 kV em razão de superação desta com a instalação do 3° BANCO DE AUTORANSFORMADOR 500/230-13,8 kV, 3x200 MVA, na SE Messias. | ||
| AXIA Energia Nordeste | MESSIAS | EL 500 kV MESSIAS LT 500 kV USINA XINGO /MESSIAS C-1 AL | RB | FT LT 500 kV USINA XINGO /MESSIAS C-1 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$469,641.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | EL 500 kV MESSIAS LT 500 kV USINA XINGO /MESSIAS C-1 AL | RB | FT LT 500 kV USINA XINGO /MESSIAS C-1 AL | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/8/2013 | 12/11/2043 | R$14,879.70 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC TIPO AKOF 500 DE FABRICAÇAO SIEMENS, 95V4 FASE C. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MESSIAS | EL 500 kV MESSIAS LT 500 kV USINA XINGO /MESSIAS C-1 AL | RB | FT LT 500 kV USINA XINGO /MESSIAS C-1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,317,894.34 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | EL 500 kV MESSIAS LT 500 kV USINA XINGO /MESSIAS C-1 AL | RB | FT LT 500 kV USINA XINGO /MESSIAS C-1 AL | 061/2001 | IPCA | RBNI | REA 5861/2016 | 5/8/2016 | 5/7/2044 | R$21,268.98 | 6/1/2025 | Ativa | EL 500 kV MESSIAS LT 500 kV USINA XINGO /MESSIAS C-1 AL * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MESSIAS | EL 500 kV MESSIAS LT 500 kV USINA XINGO /MESSIAS C-1 AL | RB | FT LT 500 kV USINA XINGO /MESSIAS C-1 AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/15/2022 | 9/14/2037 | R$77,904.50 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MESSIAS | EL 500 kV MESSIAS LT 500 kV MESSIAS /SUAPE II C-1 AL/PE | RB | FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$469,641.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | EL 500 kV MESSIAS LT 500 kV MESSIAS /SUAPE II C-1 AL/PE | RB | FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,317,894.34 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | EL 500 kV MESSIAS LT 500 kV MESSIAS /SUAPE II C-1 AL/PE | RB | FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,214,937.56 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-3 AL | RB | FT LT 230 kV MESSIAS /RIO LARGO II C-3 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-3 AL | RB | FT LT 230 kV MESSIAS /RIO LARGO II C-3 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$612,763.88 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-3 AL | RB | FT LT 230 kV MESSIAS /RIO LARGO II C-3 AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/5/2021 | 12/18/2041 | R$135,814.33 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-2 AL | RB | FT LT 230 kV MESSIAS /RIO LARGO II C-2 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-2 AL | RB | FT LT 230 kV MESSIAS /RIO LARGO II C-2 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$612,763.88 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-2 AL | RB | FT LT 230 kV MESSIAS /RIO LARGO II C-2 AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/20/2021 | 2/12/2042 | R$130,991.53 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-1 AL | RB | FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-1 AL | RB | FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$612,763.88 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-1 AL | RB | FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/12/2021 | 11/27/2040 | R$114,031.96 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO II C-2 AL | RB | FT LT 230 kV MESSIAS /MACEIO II C-2 AL | 005/2012 | IPCA | RBL | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$633,757.47 | 6/1/2025 | Ativa | T2012-057-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO II C-1 AL | RB | FT LT 230 kV MESSIAS /MACEIO II C-1 AL | 005/2012 | IPCA | RBL | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$633,757.47 | 6/1/2025 | Ativa | T2012-057-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-2 AL | RB | FT LT 230 kV MESSIAS /MACEIO C-2 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-2 AL | RB | FT LT 230 kV MESSIAS /MACEIO C-2 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$612,763.88 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-2 AL | RB | FT LT 230 kV MESSIAS /MACEIO C-2 AL | 061/2001 | IPCA | RBNI | REA 5861/2016 | 6/10/2016 | 6/9/2044 | R$20,278.32 | 6/1/2025 | Ativa | Substituição de sistemas de proteção e painéis associados em 02 terminais de linhas de transmissão (LTs-04S6 e 04S7) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-2 AL | RB | FT LT 230 kV MESSIAS /MACEIO C-2 AL | 061/2001 | IPCA | RBNI | REA 2040/2009 | 2/5/2018 | 2/8/2048 | R$76,330.69 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 230 kV associadas ao disjuntor 14S7, Posição 34S7-1, 34S7-2, 34S7-6 E 34S7-5/7 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-2 AL | RB | FT LT 230 kV MESSIAS /MACEIO C-2 AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/2/2020 | 1/1/2050 | R$63,056.22 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-1 AL | RB | FT LT 230 kV MESSIAS /MACEIO C-1 AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-1 AL | RB | FT LT 230 kV MESSIAS /MACEIO C-1 AL | 061/2001 | IPCA | RBNI | REA 2040/2009 | 11/9/2015 | 3/19/2048 | R$149,832.29 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 230 kV associadas ao disjuntor 14S6 INCLUIDA NO CICLO 2016/2017 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-1 AL | RB | FT LT 230 kV MESSIAS /MACEIO C-1 AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$612,763.88 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-1 AL | RB | FT LT 230 kV MESSIAS /MACEIO C-1 AL | 061/2001 | IPCA | RBNI | REA 5861/2016 | 6/10/2016 | 6/9/2044 | R$20,278.32 | 6/1/2025 | Ativa | Substituição de sistemas de proteção e painéis associados em 02 terminais de linhas de transmissão (LTs-04S6 e 04S7) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-1 AL | RB | FT LT 230 kV MESSIAS /MACEIO C-1 AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/4/2020 | 1/3/2050 | R$62,685.78 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-3 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-3 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$612,763.88 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-3 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$564,893.43 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-3 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/27/2019 | 9/26/2049 | R$62,566.38 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-2 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-2 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$612,763.88 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-2 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$564,893.43 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-2 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/26/2020 | 5/25/2050 | R$61,279.95 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-1 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$218,363.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-1 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$612,763.88 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MESSIAS | EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-1 PE/AL | RB | FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/2/2020 | 1/1/2050 | R$63,056.22 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | TT 69/13,8 kV MILAGRES TA2 CE | DIT | 061/2001 | IPCA | RCDM | REA 2460/2010 | 6/22/2012 | 11/4/2042 | R$235,811.79 | 6/1/2025 | Ativa | T2009-065 | Instalação de um transformador de aterramento em 69 kV - 20 MVA e 20 ohms/fase, na SE Milagres. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | TT 69/13,8 kV MILAGRES TA1 CE | DIT | 061/2001 | IPCA | RCDM | REA 7977/2019 | 12/20/2024 | 12/19/2054 | R$281,617.18 | 6/1/2025 | Ativa | T2019-032 | Obra de Substituição Completa - Substituição do transformador de aterramento TA1 por outro transformador de 10 ohms e 15 MVA. A receita anterior deste equipamento deve ser cancelada após a entrada em operação comercial do novo equipamento. | |||
| AXIA Energia Nordeste | MILAGRES | TT 13,8/0 kV MILAGRES TT2 CE | RB | FT CE 58/-35 MvAr MILAGRES CE1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | TT 13,8/0 kV MILAGRES TT1 CE | RB | FT CE 58/-35 MvAr MILAGRES CE1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | TR 69/13,8 kV MILAGRES TR8 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | TR 69/13,8 kV MILAGRES TR7 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | TR 69/13,8 kV MILAGRES TR6 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$50,053.49 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | TR 69/13,8 kV MILAGRES TR6 CE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$140,458.56 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | TR 69/13,8 kV MILAGRES TR6 CE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$129,485.63 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | TR 500/230 kV MILAGRES TRR1 CE | RB | FT TR 500/230 kV MILAGRES TRR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$622,465.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | TR 500/230 kV MILAGRES TR3 CE | RB | FT TR 500/230 kV MILAGRES TR3 CE | 061/2001 | IPCA | RBNI | REA 3929/2013 | 4/29/2016 | 6/29/2051 | R$ 5,017,143.61 | 6/1/2025 | Ativa | T2013-017 | Instalação, na subestação Milagres, do 3º banco de autotransformadores monofásicos 500/230 kV, de 3x200 MVA *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MILAGRES | TR 500/230 kV MILAGRES TR2 CE | RB | FT TR 500/230 kV MILAGRES TR2 CE | 061/2001 | IPCA | RBNI | REA 2891/2011 | 2/9/2015 | 4/10/2050 | R$ 4,872,214.90 | 6/1/2025 | Ativa | T2009-091 | Instalar o 2º banco de Autotransformadores monofásicos 500/230/13.8 kV, 3X200 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MILAGRES | TR 500/230 kV MILAGRES TR1 CE | RB | FT TR 500/230 kV MILAGRES TR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,867,395.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | TR 500/230 kV MILAGRES TR1 CE | RB | FT TR 500/230 kV MILAGRES TR1 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 8/25/2013 | 8/2/2048 | R$14,166.07 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BUCHA HSP 500 KV TIPO OTF DOS AUTOTRAFOS 05T1 A/B e R e SUBSTITUIÇÃO DE BUCHAS HSP 230 KV TIPO OTF DOS AUTOTRAFOS 05T1 A/R. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | TR 230/69 kV MILAGRES TR9 CE | RBF | FT TR 230/69 kV MILAGRES TR9 CE | 061/2001 | IPCA | RBNI | REA 2173/2009 | 8/15/2012 | 4/23/2047 | R$ 1,209,824.26 | 6/1/2025 | Ativa | T2009-183 | Instalar o 3ºtransformador 230/69 kV - 100MVA *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MILAGRES | TR 230/69 kV MILAGRES TR4 CE | RBF | FT TR 230/69 kV MILAGRES TR4 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | TR 230/69 kV MILAGRES TR4 CE | RBF | FT TR 230/69 kV MILAGRES TR4 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | TR 230/69 kV MILAGRES TR4 CE | RBF | FT TR 230/69 kV MILAGRES TR4 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$913,997.96 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | TR 230/69 kV MILAGRES TR4 CE | RBF | FT TR 230/69 kV MILAGRES TR4 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/14/2021 | 9/21/2056 | R$66,531.91 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | TR 230/69 kV MILAGRES TR3 CE | RBF | FT TR 230/69 kV MILAGRES TR3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | TR 230/69 kV MILAGRES TR3 CE | RBF | FT TR 230/69 kV MILAGRES TR3 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | TR 230/69 kV MILAGRES TR3 CE | RBF | FT TR 230/69 kV MILAGRES TR3 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/19/2021 | 2/25/2056 | R$65,621.71 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | TR 230/69 kV MILAGRES TR10 CE | RBF | FT TR 230/69 kV MILAGRES TR10 CE | 061/2001 | IPCA | RBNI | REA 7977/2019 | 12/20/2024 | 12/19/2058 | R$ 1,489,966.02 | 6/1/2025 | Ativa | T2019-032 | Instalação do quarto transformador trifásico 230/69 kV, 100 MVA. | ||
| AXIA Energia Nordeste | MILAGRES | TR 230/13,8 kV MILAGRES TR1 CE | RB | FT CE 58/-35 MvAr MILAGRES CE1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$247,202.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | TR 13,8/13,8 kV MILAGRES TREG1 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$89,202.86 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | RTS 13,8 kV 5 Mvar MILAGRES RT4 CE | RBF | FT TR 230/69 kV MILAGRES TR4 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | RTS 13,8 kV 5 Mvar MILAGRES RT4 CE | RBF | FT TR 230/69 kV MILAGRES TR4 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$351,841.75 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | RTS 13,8 kV 5 Mvar MILAGRES RT4 CE | RBF | FT TR 230/69 kV MILAGRES TR4 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$324,355.11 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | RTS 13,8 kV 5 Mvar MILAGRES RT3 CE | RBF | FT TR 230/69 kV MILAGRES TR3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | RTS 13,8 kV 5 Mvar MILAGRES RT3 CE | RBF | FT TR 230/69 kV MILAGRES TR3 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$351,841.75 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | RTS 13,8 kV 18,75 Mvar MILAGRES RT1 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$160,199.57 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | RTL 500 kV 60 Mvar MILAGRES RTR2 CE | RB | FT RTL 500 kV 60 Mvar MILAGRES RTR2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,898.24 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | RTL 500 kV 180 Mvar MILAGRES RT3 CE | RB | FT LT 500 kV MILAGRES /QUIXADA C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$346,798.99 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | RTL 500 kV 180 Mvar MILAGRES RT3 CE | RB | FT LT 500 kV MILAGRES /QUIXADA C-1 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/27/2013 | 12/6/2049 | R$12,530.05 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BUCHAS HSP 500 KV TIPO OTF DOS REATORES 05E3 A/B/C E R. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | RTL 500 kV 120 Mvar MILAGRES RT1 CE | RB | FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$719,131.38 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | RTL 230 kV 10 Mvar MILAGRES RT3 CE | RB | FT LT 230 kV MAURITI II /MILAGRES C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$163,799.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | RTL 230 kV 10 Mvar MILAGRES RT3 CE | RB | FT LT 230 kV MAURITI II /MILAGRES C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$459,650.17 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | RTL 230 kV 10 Mvar MILAGRES RT2 CE | RB | FT LT 230 kV ABAIARA /MILAGRES C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$163,799.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | RTL 230 kV 10 Mvar MILAGRES RT2 CE | RB | FT LT 230 kV ABAIARA /MILAGRES C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/13/2018 | 6/22/2054 | R$ 991.98 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | RTL 230 kV 10 Mvar MILAGRES RT1 CE | RB | FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$163,799.89 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | RTL 230 kV 10 Mvar MILAGRES RT1 CE | RB | FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$459,650.17 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | RTL 230 kV 10 Mvar MILAGRES RT1 CE | RB | FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/1/2018 | 8/11/2054 | R$1,983.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | RTB 500 kV 40 Mvar MILAGRES RTR1 CE | RB | FT RTB 500 kV 40 MVAr MILAGRES RTR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$239,710.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | RTB 500 kV 120 Mvar MILAGRES RT2 CE | RB | FT RTB 500 kV 120 Mvar MILAGRES RT2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$313,969.90 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | RTB 230 kV 3,33 Mvar MILAGRES RTR1 CE | RB | FT RTB 230 kV 3,33 MVAr MILAGRES RTR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$54,539.90 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | RTB 230 kV 3,33 Mvar MILAGRES RTR1 CE | RB | FT RTB 230 kV 3,33 MVAr MILAGRES RTR1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$153,048.17 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | RTB 230 kV 3,33 Mvar MILAGRES RTR1 CE | RB | FT RTB 230 kV 3,33 MVAr MILAGRES RTR1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/11/2018 | 6/20/2054 | R$ 991.84 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | RTB 230 kV 20 Mvar MILAGRES RT4 CE | RB | FT RTB 230 kV 20 MVAr MILAGRES RT4 CE | 061/2001 | IPCA | RBNI | REA 3929/2013 | 11/4/2015 | 1/6/2044 | R$50,407.18 | 6/1/2025 | Ativa | T2013-017 | Realocação de um reator de barra de 20 Mvar, em 230 kV. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MILAGRES | RTB 230 kV 20 Mvar MILAGRES RT4 CE | RB | FT RTB 230 kV 20 MVAr MILAGRES RT4 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$216,371.11 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | RTB 230 kV 20 Mvar MILAGRES RT4 CE | RB | FT RTB 230 kV 20 MVAr MILAGRES RT4 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$607,173.90 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | RTB 230 kV 20 Mvar MILAGRES RT4 CE | RB | FT RTB 230 kV 20 MVAr MILAGRES RT4 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$559,740.16 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | RTB 13,8 kV 5 Mvar MILAGRES RT3 CE | RBF | FT RTB 13,8 kV 5 MVAr MILAGRES RT3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 |
| Revenue Concessionaire | Edification | Module | Classification | Transmission Function | Revenue Contract | Index | Revenue Type | RAP Act | Start | End | 2025/2026 RAP Cycle | RAP Reference Date | RAP Situation | Project | Revenue Description | Quarter | Obs |
| AXIA Energia Nordeste | MILAGRES | RTB 13,8 kV 5 Mvar MILAGRES RT1 CE | RBF | FT RTB 13,8 kV 5 MVAr MILAGRES RT1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | RTB 13,8 kV 5 Mvar MILAGRES RT1 CE | RBF | FT RTB 13,8 kV 5 MVAr MILAGRES RT1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$351,841.75 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | RTB 13,8 kV 10 Mvar MILAGRES RTR1 CE | RBF | FT RTB 13,8 kV 10 Mvar MILAGRES RTR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$143,640.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | RTB 13,8 kV 10 Mvar MILAGRES RT2 CE | RBF | FT RTB 13,8 kV 10 Mvar MILAGRES RT2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$143,640.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | RTB 13,8 kV 10 Mvar MILAGRES RT2 CE | RBF | FT RTB 13,8 kV 10 Mvar MILAGRES RT2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$403,079.78 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | RTB 13,8 kV 10 Mvar MILAGRES RT2 CE | RBF | FT RTB 13,8 kV 10 Mvar MILAGRES RT2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$371,590.31 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MG 500 kV MILAGRES MG1 CE | RB | FT MG 500 kV MILAGRES MG1 CE | 061/2001 | IPCA | RBNI | REA 2173/2009 | 8/15/2012 | 2/7/2043 | R$119,347.93 | 6/1/2025 | Ativa | T2009-183 | Remanejar Banco de Capacitores 230 kV - 50,5 Mvar e conexão. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MILAGRES | MG 500 kV MILAGRES MG1 CE | RB | FT MG 500 kV MILAGRES MG1 CE | 061/2001 | IPCA | RBNI | REA 2460/2010 | 6/22/2012 | 6/21/2042 | R$20,879.40 | 6/1/2025 | Ativa | T2009-065 | Complemento de módulo de infraestrutura em 69 kV devido à instalação de transformador de aterramento em 69 kV - 20 MVA e 20 ohms/fase e conexão. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MILAGRES | MG 500 kV MILAGRES MG1 CE | RB | FT MG 500 kV MILAGRES MG1 CE | 061/2001 | IPCA | RBNI | REA 2891/2011 | 12/15/2014 | 9/21/2045 | R$672,094.31 | 6/1/2025 | Ativa | T2009-091 | Instalar módulo de infra-estrutura de manobra 500 kV, para os módulos de interligação de barramento e conexão do 2º banco de autotransformadores. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MILAGRES | MG 500 kV MILAGRES MG1 CE | RB | FT MG 500 kV MILAGRES MG1 CE | 061/2001 | IPCA | RBNI | REA 2891/2011 | 12/15/2014 | 6/8/2045 | R$181,602.09 | 6/1/2025 | Ativa | T2009-091 | Adequar o módulo geral com módulo de infraestrutura de manobra 230 kV para o módulo de conexão do 2º banco de autotransformadores 500/230 kV. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MILAGRES | MG 500 kV MILAGRES MG1 CE | RB | FT MG 500 kV MILAGRES MG1 CE | 061/2001 | IPCA | RBNI | REA 3929/2013 | 4/29/2016 | 1/13/2047 | R$879,905.71 | 6/1/2025 | Ativa | T2013-017 | Complementação do módulo de infraestrutura geral da subestação Milagres com um módulo de infraestrutura de manobra em 500 kV, arranjo disjuntor e meio, e um módulo de infraestrutura de manobra em 230 kV, arranjo barra principal e transferência. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MILAGRES | MG 500 kV MILAGRES MG1 CE | RB | FT MG 500 kV MILAGRES MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,301,164.92 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MG 500 kV MILAGRES MG1 CE | RB | FT MG 500 kV MILAGRES MG1 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 2/3/2014 | 2/2/2031 | R$2,306.64 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCOS DE BATERIAS -48Vcc Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | MG 500 kV MILAGRES MG1 CE | RB | FT MG 500 kV MILAGRES MG1 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/28/2015 | 10/27/2032 | R$17,383.35 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição das Bateriais Saturnia 60PZS400 125 Vcc, Posições 800A3 e 800A4 .Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | MG 500 kV MILAGRES MG1 CE | RB | FT MG 500 kV MILAGRES MG1 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/29/2015 | 10/28/2032 | R$17,386.17 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição das Bateriais Saturnia 60PZS400 125 Vcc, Posições 800A7 e 800A8 .Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | MG 500 kV MILAGRES MG1 CE | RB | FT MG 500 kV MILAGRES MG1 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/29/2015 | 10/28/2032 | R$26,781.94 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição das Bateriais Saturnia 60PZS400 250Vcc, Posições 900A1 e 900A2 .Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | MG 500 kV MILAGRES MG1 CE | RB | FT MG 500 kV MILAGRES MG1 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/24/2015 | 7/23/2030 | R$145,092.34 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SWITCH.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | MG 500 kV MILAGRES MG1 CE | RB | FT MG 500 kV MILAGRES MG1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,651,288.61 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MG 500 kV MILAGRES MG1 CE | RB | FT MG 500 kV MILAGRES MG1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 3,366,041.99 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MG 500 kV MILAGRES MG1 CE | RB | FT MG 500 kV MILAGRES MG1 CE | 061/2001 | IPCA | RMEL | REN 443/2011 | 9/28/2016 | 9/27/2033 | R$7,166.07 | 6/1/2025 | Ativa | Implantação de Banco de Baterias * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | MG 500 kV MILAGRES MG1 CE | RB | FT MG 500 kV MILAGRES MG1 CE | 061/2001 | IPCA | RBNIA | REA 7977/2019 | R$56,937.53 | 6/1/2025 | Prevista | T2019-032 | Recapacitação da barra de 69 kV da Subestação Milagres. | 4T25 | |||
| AXIA Energia Nordeste | MILAGRES | MG 500 kV MILAGRES MG1 CE | RB | FT MG 500 kV MILAGRES MG1 CE | 061/2001 | IPCA | RBNIA | REA 7977/2019 | R$123,401.29 | 6/1/2025 | Prevista | T2019-032 | Instalação de módulo de infraestrutura MIM em 230 kV, associado à instalação do quarto transformador trifásico 230/69 kV, 100 MVA. | 4T25 | |||
| AXIA Energia Nordeste | MILAGRES | MG 500 kV MILAGRES MG1 CE | RB | FT MG 500 kV MILAGRES MG1 CE | 061/2001 | IPCA | RBNIA | REA 7977/2019 | R$42,299.50 | 6/1/2025 | Prevista | T2019-032 | Instalação de módulo de infraestrutura MIM em 69 kV, associado à instalação do quarto transformador trifásico 230/69 kV, 100 MVA. | 4T25 | |||
| AXIA Energia Nordeste | MILAGRES | MG 500 kV MILAGRES MG1 CE | RB | FT MG 500 kV MILAGRES MG1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/26/2019 | 11/13/2035 | R$294,131.11 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | MG 500 kV MILAGRES MG1 CE | RB | FT MG 500 kV MILAGRES MG1 CE | 061/2001 | IPCA | RBNI | DSP 386/2021 | 2/17/2021 | 3/7/2042 | R$702,869.53 | 6/1/2025 | Ativa | Implantação de Sistema Automático de Regulação de Transformadores (composto por CLP, switch ethernet e cabos de controle). Reconfiguração na base de dados do SAGE, relés auxiliares e adequações na fiação e cabeação. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | MC 69 kV TT 69/13,8 kV MILAGRES TA2 CE | DIT | 061/2001 | IPCA | RCDM | REA 2460/2010 | 6/22/2012 | 7/2/2046 | R$231,828.66 | 6/1/2025 | Ativa | T2009-065 | Instalação de módulo de manobra de conexão de transformador de aterramento em 69 kV, arranjo específico. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | MC 69 kV TT 69/13,8 kV MILAGRES TA1 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | MC 69 kV TT 69/13,8 kV MILAGRES TA1 CE | DIT | 061/2001 | IPCA | RCDM | REA 7977/2019 | 12/20/2024 | 12/19/2040 | R$36,534.21 | 6/1/2025 | Ativa | T2019-032 | Adequações na conexão do transformador de aterramento TA1 em função da substituição do equipamento. | |||
| AXIA Energia Nordeste | MILAGRES | MC 69 kV TR 69/13,8 kV MILAGRES TR6 CE TR7 e TR8 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | MC 69 kV TR 69/13,8 kV MILAGRES TR6 CE TR7 e TR8 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | MC 69 kV TR 230/69 kV MILAGRES TR9 CE | RBF | FT TR 230/69 kV MILAGRES TR9 CE | 061/2001 | IPCA | RBNI | REA 2173/2009 | 8/15/2012 | 10/23/2044 | R$307,135.22 | 6/1/2025 | Ativa | T2009-183 | Instalar um módulo de conexão de transformador 69 kV, arranjo barra principal e de transferência, referente ao 3º transformador 230/69 kV - 100 MVA *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MILAGRES | MC 69 kV TR 230/69 kV MILAGRES TR9 CE | RBF | FT TR 230/69 kV MILAGRES TR9 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/16/2017 | 7/19/2047 | R$6,789.69 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | MC 69 kV TR 230/69 kV MILAGRES TR4 CE | RBF | FT TR 230/69 kV MILAGRES TR4 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 69 kV TR 230/69 kV MILAGRES TR4 CE | RBF | FT TR 230/69 kV MILAGRES TR4 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 69 kV TR 230/69 kV MILAGRES TR4 CE | RBF | FT TR 230/69 kV MILAGRES TR4 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/1/2018 | 4/30/2042 | R$7,028.43 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | MC 69 kV TR 230/69 kV MILAGRES TR3 CE | RBF | FT TR 230/69 kV MILAGRES TR3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 69 kV TR 230/69 kV MILAGRES TR3 CE | RBF | FT TR 230/69 kV MILAGRES TR3 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 69 kV TR 230/69 kV MILAGRES TR3 CE | RBF | FT TR 230/69 kV MILAGRES TR3 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/13/2021 | 12/12/2045 | R$7,992.55 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | MC 69 kV TR 230/69 kV MILAGRES TR10 CE | RBF | FT TR 230/69 kV MILAGRES TR10 CE | 061/2001 | IPCA | RBNI | REA 7977/2019 | 12/20/2024 | 12/19/2052 | R$399,365.22 | 6/1/2025 | Ativa | T2019-032 | Instalação, na SE MILAGRES, de um módulo de conexão, em 69 kV, para o autotransformador TR 230/69 kV MILAGRES TR10 CE | ||
| AXIA Energia Nordeste | MILAGRES | MC 69 kV BC 69 kV 25,2 Mvar MILAGRES BC1 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | MC 69 kV BC 69 kV 25,2 Mvar MILAGRES BC1 CE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | MC 69 kV BC 69 kV 25,2 Mvar MILAGRES BC1 CE | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/24/2019 | 11/26/2049 | R$40,264.07 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MILAGRES | MC 500 kV TR 500/230 kV MILAGRES TR3 CE | RB | FT TR 500/230 kV MILAGRES TR3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$469,641.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 500 kV TR 500/230 kV MILAGRES TR3 CE | RB | FT TR 500/230 kV MILAGRES TR3 CE | 061/2001 | IPCA | RBNI | REA 3929/2013 | 2/12/2025 | 2/11/2053 | R$ 1,883,099.52 | 6/1/2025 | Ativa | T2013-017 | Instalação, na subestação Milagres, de um módulo de conexão 500 kV, arranjo disjuntor e meio, para o 3º banco de autotransformadores monofásicos 500/230 kV, de 3x200 MVA. | ||
| AXIA Energia Nordeste | MILAGRES | MC 500 kV TR 500/230 kV MILAGRES TR2 CE | RB | FT TR 500/230 kV MILAGRES TR2 CE | 061/2001 | IPCA | RBNI | REA 2891/2011 | 2/9/2015 | 9/14/2047 | R$ 1,547,895.07 | 6/1/2025 | Ativa | T2009-091 | Instalar um módulo de conexão de transformador 500 kV, arranjo DJM, para o segundo banco de autotransformadores 500/230 kV - 600 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MILAGRES | MC 500 kV TR 500/230 kV MILAGRES TR1 CE | RB | FT TR 500/230 kV MILAGRES TR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$414,502.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 500 kV TR 500/230 kV MILAGRES TR1 CE | RB | FT TR 500/230 kV MILAGRES TR1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/19/2017 | 2/15/2039 | R$116,008.64 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | MC 500 kV RTL 500 kV 180 Mvar MILAGRES RT3 CE | RB | FT LT 500 kV MILAGRES /QUIXADA C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$251,123.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 500 kV RTL 500 kV 180 Mvar MILAGRES RT3 CE | RB | FT LT 500 kV MILAGRES /QUIXADA C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/8/2021 | 9/11/2051 | R$75,667.01 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | MC 500 kV RTL 500 kV 120 Mvar MILAGRES RT1 CE | RB | FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$251,123.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 500 kV RTL 500 kV 120 Mvar MILAGRES RT1 CE | RB | FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/8/2021 | 9/11/2051 | R$75,667.01 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | MC 500 kV RTB 500 kV 120 Mvar MILAGRES RT2 CE | RB | FT RTB 500 kV 120 Mvar MILAGRES RT2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$388,096.61 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 500 kV RTB 500 kV 120 Mvar MILAGRES RT2 CE | RB | FT RTB 500 kV 120 Mvar MILAGRES RT2 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/8/2021 | 9/11/2051 | R$49,407.06 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV TR 500/230 kV MILAGRES TR3 CE | RB | FT TR 500/230 kV MILAGRES TR3 CE | 061/2001 | IPCA | RBNI | REA 3929/2013 | 4/29/2016 | 11/12/2048 | R$890,676.55 | 6/1/2025 | Ativa | T2013-017 | Instalação, na subestação Milagres, de um módulo de conexão 230 kV, arranjo barra principal e transferência, para banco o 3º banco de autotransformadores monofásicos 500/230 kV, de 3x200 MVA. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV TR 500/230 kV MILAGRES TR2 CE | RB | FT TR 500/230 kV MILAGRES TR2 CE | 061/2001 | IPCA | RBNI | REA 2891/2011 | 2/9/2015 | 6/2/2047 | R$927,200.97 | 6/1/2025 | Ativa | T2009-091 | Instalação de módulo de conexão de transformador 230kV, arranjo BPT, *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV TR 500/230 kV MILAGRES TR1 CE | RB | FT TR 500/230 kV MILAGRES TR1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV TR 500/230 kV MILAGRES TR1 CE | RB | FT TR 500/230 kV MILAGRES TR1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/23/2021 | 12/5/2052 | R$251,831.33 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV TR 230/69 kV MILAGRES TR9 CE | RBF | FT TR 230/69 kV MILAGRES TR9 CE | 061/2001 | IPCA | RBNI | REA 2173/2009 | 8/15/2012 | 12/6/2044 | R$865,854.09 | 6/1/2025 | Ativa | T2009-183 | Instalar um módulo de conexão de transformador 230 kV, arranjo barra principal e de transferência, referente ao 3º transformador 230/69 kV - 100 MVA *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV TR 230/69 kV MILAGRES TR4 CE | RBF | FT TR 230/69 kV MILAGRES TR4 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV TR 230/69 kV MILAGRES TR4 CE | RBF | FT TR 230/69 kV MILAGRES TR4 CE | 061/2001 | IPCA | RBNI | REA 3578/2012 | 6/7/2016 | 6/23/2049 | R$95,941.38 | 6/1/2025 | Ativa | Substituição do disjuntor 14T4 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV TR 230/69 kV MILAGRES TR4 CE | RBF | FT TR 230/69 kV MILAGRES TR4 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/15/2021 | 12/12/2049 | R$91,343.60 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV TR 230/69 kV MILAGRES TR3 CE | RBF | FT TR 230/69 kV MILAGRES TR3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV TR 230/69 kV MILAGRES TR3 CE | RBF | FT TR 230/69 kV MILAGRES TR3 CE | 061/2001 | IPCA | RBNI | REA 3578/2012 | 4/12/2016 | 5/27/2049 | R$96,860.47 | 6/1/2025 | Ativa | Substituição do disjuntor 14T3 INCLUIDA NO CICLO 2016/2017 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV TR 230/69 kV MILAGRES TR3 CE | RBF | FT TR 230/69 kV MILAGRES TR3 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/1/2019 | 7/28/2047 | R$84,979.52 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV TR 230/69 kV MILAGRES TR10 CE | RBF | FT TR 230/69 kV MILAGRES TR10 CE | 061/2001 | IPCA | RBNI | REA 7977/2019 | 12/20/2024 | 12/19/2052 | R$ 1,015,815.53 | 6/1/2025 | Ativa | T2019-032 | Instalação, na SE MILAGRES, de um módulo de conexão, em 230 kV, para o autotransformador TR 230/69 kV MILAGRES TR10 CE | ||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV TR 230/13,8 kV MILAGRES TR1 CE CE1/CE2 | RB | FT CE 58/-35 MvAr MILAGRES CE1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$151,198.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV RTL 230 kV 10 Mvar MILAGRES RT3 CE | RB | FT LT 230 kV MAURITI II /MILAGRES C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$91,861.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV RTL 230 kV 10 Mvar MILAGRES RT3 CE | RB | FT LT 230 kV MAURITI II /MILAGRES C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/29/2021 | 10/28/2045 | R$25,603.03 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV RTL 230 kV 10 Mvar MILAGRES RT2 CE | RB | FT LT 230 kV ABAIARA /MILAGRES C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$91,861.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV RTL 230 kV 10 Mvar MILAGRES RT2 CE | RB | FT LT 230 kV ABAIARA /MILAGRES C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/28/2021 | 10/27/2045 | R$25,600.67 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV RTL 230 kV 10 Mvar MILAGRES RT1 CE | RB | FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$91,861.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV RTB 230 kV 20 Mvar MILAGRES RT4 CE | RB | FT RTB 230 kV 20 MVAr MILAGRES RT4 CE | 061/2001 | IPCA | RBNI | REA 3929/2013 | 11/4/2015 | 3/1/2051 | R$57,375.90 | 6/1/2025 | Ativa | T2013-017 | Realocação de um módulo de conexão 230 kV para reator de barra de 20 Mvar. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV RTB 230 kV 20 Mvar MILAGRES RT4 CE | RB | FT RTB 230 kV 20 MVAr MILAGRES RT4 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$140,466.92 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV RTB 230 kV 20 Mvar MILAGRES RT4 CE | RB | FT RTB 230 kV 20 MVAr MILAGRES RT4 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/3/2018 | 10/9/2038 | R$79,194.95 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV BC 230 kV 50,5 Mvar MILAGRES BC2 CE | RB | FT BC 230 kV 50,5 MVAr MILAGRES BC2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$166,750.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV BC 230 kV 50,5 Mvar MILAGRES BC2 CE | RB | FT BC 230 kV 50,5 MVAr MILAGRES BC2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$467,928.80 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV BC 230 kV 50,5 Mvar MILAGRES BC2 CE | RB | FT BC 230 kV 50,5 MVAr MILAGRES BC2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$431,373.18 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV BC 230 kV 50,5 Mvar MILAGRES BC1 CE | RB | FT BC 230 kV 50,5 MVAr MILAGRES BC1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$166,750.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV BC 230 kV 50,5 Mvar MILAGRES BC1 CE | RB | FT BC 230 kV 50,5 MVAr MILAGRES BC1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$467,928.80 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 230 kV BC 230 kV 50,5 Mvar MILAGRES BC1 CE | RB | FT BC 230 kV 50,5 MVAr MILAGRES BC1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$431,373.18 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 13,8 kV TT 13,8/0 kV MILAGRES TT2 CE | RB | FT CE 58/-35 MvAr MILAGRES CE1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 13,8 kV TT 13,8/0 kV MILAGRES TT1 CE | RB | FT CE 58/-35 MvAr MILAGRES CE1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 13,8 kV TR 69/13,8 kV MILAGRES TR7 CE TR8 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | MC 13,8 kV TR 69/13,8 kV MILAGRES TR7 CE TR8 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$125,341.16 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | MC 13,8 kV TR 69/13,8 kV MILAGRES TR7 CE TR8 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$115,549.23 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | MC 13,8 kV TR 69/13,8 kV MILAGRES TR6 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | MC 13,8 kV TR 69/13,8 kV MILAGRES TR6 CE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$125,341.16 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | MC 13,8 kV TR 230/69 kV MILAGRES TR4 CE | RBF | FT TR 230/69 kV MILAGRES TR4 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 13,8 kV TR 230/69 kV MILAGRES TR3 CE | RBF | FT TR 230/69 kV MILAGRES TR3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 13,8 kV TR 230/69 kV MILAGRES TR3 CE | RBF | FT TR 230/69 kV MILAGRES TR3 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$125,341.16 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 13,8 kV TR 230/13,8 kV MILAGRES TR1 CE CE2 | RB | FT CE 58/-35 MvAr MILAGRES CE1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$48,477.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 13,8 kV TR 230/13,8 kV MILAGRES TR1 CE CE1 | RB | FT CE 58/-35 MvAr MILAGRES CE1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$48,477.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 13,8 kV TR 13,8/13,8 kV MILAGRES TREG1 CE MC2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | MC 13,8 kV TR 13,8/13,8 kV MILAGRES TREG1 CE MC1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | MC 13,8 kV RTB 13,8 kV 5 Mvar MILAGRES RT3 CE | RBF | FT RTB 13,8 kV 5 MVAr MILAGRES RT3 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,598.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 13,8 kV RTB 13,8 kV 5 Mvar MILAGRES RT3 CE | RBF | FT RTB 13,8 kV 5 MVAr MILAGRES RT3 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,662.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 13,8 kV RTB 13,8 kV 5 Mvar MILAGRES RT1 CE | RBF | FT RTB 13,8 kV 5 MVAr MILAGRES RT1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,598.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 13,8 kV RTB 13,8 kV 5 Mvar MILAGRES RT1 CE | RBF | FT RTB 13,8 kV 5 MVAr MILAGRES RT1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,662.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 13,8 kV RTB 13,8 kV 10 Mvar MILAGRES RT2 CE | RBF | FT RTB 13,8 kV 10 Mvar MILAGRES RT2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,598.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | MC 13,8 kV RTB 13,8 kV 10 Mvar MILAGRES RT2 CE | RBF | FT RTB 13,8 kV 10 Mvar MILAGRES RT2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,662.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | IB 69 kV MG 500 kV MILAGRES MG1 CE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | IB 69 kV MG 500 kV MILAGRES MG1 CE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$118,244.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | IB 69 kV MG 500 kV MILAGRES MG1 CE IB1 | DIT | 061/2001 | IPCA | RCDM | REA 7977/2019 | 12/20/2024 | 12/19/2048 | R$52,023.14 | 6/1/2025 | Ativa | T2019-032 | Adequação no módulo de interligação IB em 69 kV, associado à instalação do quarto transformador trifásico 230/69 kV, 100 MVA. | |||
| AXIA Energia Nordeste | MILAGRES | IB 500 kV MG 500 kV MILAGRES MG1 CE IB3 | RB | FT MG 500 kV MILAGRES MG1 CE | 061/2001 | IPCA | RBNI | REA 3929/2013 | 4/29/2016 | 11/4/2049 | R$ 1,499,697.04 | 6/1/2025 | Ativa | T2013-017 | Instalação, na subestação Milagres, de um módulo de interligação de barras 500 kV, arranjo disjuntor e meio. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MILAGRES | IB 500 kV MG 500 kV MILAGRES MG1 CE IB2 | RB | FT MG 500 kV MILAGRES MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$439,875.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | IB 500 kV MG 500 kV MILAGRES MG1 CE IB1 | RB | FT MG 500 kV MILAGRES MG1 CE | 061/2001 | IPCA | RBNI | REA 2891/2011 | 12/15/2014 | 6/21/2048 | R$ 1,448,519.99 | 6/1/2025 | Ativa | T2009-091 | Instalar um módulo de interligação de barras 500 kV, arranjo DJM. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MILAGRES | IB 230 kV MG 500 kV MILAGRES MG1 CE IB1 | RB | FT MG 500 kV MILAGRES MG1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,837.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | IB 230 kV MG 500 kV MILAGRES MG1 CE IB1 | RB | FT MG 500 kV MILAGRES MG1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$325,059.40 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | IB 230 kV MG 500 kV MILAGRES MG1 CE IB1 | RB | FT MG 500 kV MILAGRES MG1 CE | 061/2001 | IPCA | RBNIA | REA 7977/2019 | R$193,851.87 | 6/1/2025 | Prevista | T2019-032 | Adequação no módulo de interligação IB em 230 kV, associado à instalação do quarto transformador trifásico 230/69 kV, 100 MVA. | 4T25 | |||
| AXIA Energia Nordeste | MILAGRES | IB 13,8 kV MG 500 kV MILAGRES MG1 CE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$30,696.61 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | IB 13,8 kV MG 500 kV MILAGRES MG1 CE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$86,139.86 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | IB 13,8 kV MG 500 kV MILAGRES MG1 CE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$79,410.43 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | EL 69 kV MILAGRES DIST8 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | EL 69 kV MILAGRES DIST7 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | EL 69 kV MILAGRES DIST7 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | EL 69 kV MILAGRES DIST7 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | EL 69 kV MILAGRES DIST7 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/8/2022 | 9/10/2052 | R$34,825.34 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MILAGRES | EL 69 kV MILAGRES DIST6 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | EL 69 kV MILAGRES DIST6 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | EL 69 kV MILAGRES DIST6 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | EL 69 kV MILAGRES DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | EL 69 kV MILAGRES DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | EL 69 kV MILAGRES DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | EL 69 kV MILAGRES DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | EL 69 kV MILAGRES DIST4 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/13/2022 | 10/15/2052 | R$34,915.89 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MILAGRES | EL 69 kV MILAGRES DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | EL 69 kV MILAGRES DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | EL 69 kV MILAGRES DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | EL 69 kV MILAGRES DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | EL 69 kV MILAGRES DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | EL 69 kV MILAGRES DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | EL 500 kV MILAGRES LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE | RB | FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$469,641.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | EL 500 kV MILAGRES LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE | RB | FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE | 061/2001 | IPCA | RBNIA | REA 8771/2020 | R$406,044.39 | 6/1/2025 | Prevista | T2019-090 | Adequações das proteções, na SE Milagres, na EL para Milagres II, em função do seccionamento da LT 500 kV LG - Milagres C1 | ||||
| AXIA Energia Nordeste | MILAGRES | EL 500 kV MILAGRES LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE | RB | FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/8/2021 | 9/10/2051 | R$71,691.56 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | EL 500 kV MILAGRES LT 500 kV MILAGRES /QUIXADA C-1 CE | RB | FT LT 500 kV MILAGRES /QUIXADA C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$469,641.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | EL 500 kV MILAGRES LT 500 kV MILAGRES /QUIXADA C-1 CE | RB | FT LT 500 kV MILAGRES /QUIXADA C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/8/2021 | 9/11/2051 | R$109,662.34 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV MILAGRES /CRATO II C-1 CE | RB | FT LT 230 kV MILAGRES /CRATO II C-1 CE | 007/2005 | IGPM | RBL | CC 007/2005 | 12/28/2007 | 3/4/2035 | R$552,929.41 | 6/1/2025 | Ativa | Contrato de Concessão nº 007/2005 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV MILAGRES /COREMAS C-2 CE/PB | RB | FT LT 230 kV MILAGRES /COREMAS C-2 CE/PB | 008/2005 | IGPM | RBL | CC 008/2005 | 9/25/2009 | 3/4/2035 | R$611,602.36 | 6/1/2025 | Ativa | T2000-016 | Contrato de Concessão nº 008/2005 *(Considera adicional de RGR relativo à prorrogação do encargo) | ||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV MILAGRES /COREMAS C-1 CE/PB | RB | FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV MILAGRES /COREMAS C-1 CE/PB | RB | FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$596,907.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV MILAGRES /COREMAS C-1 CE/PB | RB | FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB | 061/2001 | IPCA | RBNI | REA 5861/2016 | 2/2/2014 | 2/1/2042 | R$31,272.31 | 6/1/2025 | Ativa | Substituição de sistemas de proteção e painéis associados em 01 terminal de linha de transmissão (04M6) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV MILAGRES /COREMAS C-1 CE/PB | RB | FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/6/2021 | 5/20/2042 | R$72,156.46 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV MILAGRES /BANABUIU C-2 CE | RB | FT LT 230 kV MILAGRES /BANABUIU C-2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV MILAGRES /BANABUIU C-2 CE | RB | FT LT 230 kV MILAGRES /BANABUIU C-2 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/29/2013 | 9/28/2041 | R$33,584.64 | 6/1/2025 | Ativa | Substituição do sistema de proteção da LT Banabuiu-Milagres 04M3 na SE Milagres, por proteção digital (retrofit) .Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV MILAGRES /BANABUIU C-2 CE | RB | FT LT 230 kV MILAGRES /BANABUIU C-2 CE | 061/2001 | IPCA | RBNI | REA 3578/2012 | 12/14/2015 | 1/27/2049 | R$95,912.26 | 6/1/2025 | Ativa | Substituição do disjuntor 14M3 INCLUIDA NO CICLO 2016/2017 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV MILAGRES /BANABUIU C-2 CE | RB | FT LT 230 kV MILAGRES /BANABUIU C-2 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/18/2022 | 3/5/2051 | R$151,354.15 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV MILAGRES /BANABUIU C-1 CE | RB | FT LT 230 kV MILAGRES /BANABUIU C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV MILAGRES /BANABUIU C-1 CE | RB | FT LT 230 kV MILAGRES /BANABUIU C-1 CE | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/26/2013 | 11/25/2041 | R$33,790.72 | 6/1/2025 | Ativa | Substituição do sistema de proteção da LT Banabuiu-Milagres 04M1 na SE Milagres, por proteção digital (retrofit) .Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV MILAGRES /BANABUIU C-1 CE | RB | FT LT 230 kV MILAGRES /BANABUIU C-1 CE | 061/2001 | IPCA | RBNI | REA 3578/2012 | 2/1/2016 | 3/17/2049 | R$96,300.42 | 6/1/2025 | Ativa | Substituição do disjuntor 14M1 INCLUIDA NO CICLO 2016/2017 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV MILAGRES /BANABUIU C-1 CE | RB | FT LT 230 kV MILAGRES /BANABUIU C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/10/2021 | 9/28/2045 | R$171,470.95 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| Nova Era Integração | MILAGRES | EL 230 kV MILAGRES LT 230 kV MAURITI II /MILAGRES C-2 CE | RB | FT LT 230 kV MAURITI II /MILAGRES C-2 CE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,361,052.55 | 6/1/2025 | Prevista | T2024-197-B | LT 230 kV Araticum (Mauriti) - Milagres - C2 | ||||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV MAURITI II /MILAGRES C-1 CE | RB | FT LT 230 kV MAURITI II /MILAGRES C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV MAURITI II /MILAGRES C-1 CE | RB | FT LT 230 kV MAURITI II /MILAGRES C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$596,907.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV MAURITI II /MILAGRES C-1 CE | RB | FT LT 230 kV MAURITI II /MILAGRES C-1 CE | 061/2001 | IPCA | RBNI | REA 7761/2019 | 10/7/2021 | 10/6/2036 | R$55,818.22 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE SISTEMAS DE PROTEÇÃO E PAINÉIS ASSOCIADOS EM 01 TERMINAL DE LINHA DE TRANSMISSÃO LT 04L3. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV MAURITI II /MILAGRES C-1 CE | RB | FT LT 230 kV MAURITI II /MILAGRES C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/10/2021 | 3/24/2048 | R$45,022.60 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV ICO /MILAGRES C-1 CE | RB | FT LT 230 kV ICO /MILAGRES C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV ICO /MILAGRES C-1 CE | RB | FT LT 230 kV ICO /MILAGRES C-1 CE | 061/2001 | IPCA | RMEL | REN 443/2011 | 7/11/2015 | 7/13/2045 | R$12,294.80 | 6/1/2025 | Ativa | Substituído TPC CCV245 com desgaste prematuro. Posição Operacional: 84M2-B/MLG. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV ICO /MILAGRES C-1 CE | RB | FT LT 230 kV ICO /MILAGRES C-1 CE | 061/2001 | IPCA | RBNI | REA 3578/2012 | 6/7/2016 | 9/28/2048 | R$147,360.13 | 6/1/2025 | Ativa | EL 230 kV MILAGRES LT 230 kV ICO /MILAGRES C-1 CE * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV ICO /MILAGRES C-1 CE | RB | FT LT 230 kV ICO /MILAGRES C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/31/2021 | 2/13/2048 | R$44,868.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-1 PE/CE | RB | FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-1 PE/CE | RB | FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE | 061/2001 | IPCA | RBNI | REA 7761/2019 | 10/7/2021 | 10/6/2036 | R$56,259.22 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE SISTEMAS DE PROTEÇÃO E PAINÉIS ASSOCIADOS EM 01 TERMINAL DE LINHA DE TRANSMISSÃO LT 04L1. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-1 PE/CE | RB | FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/26/2021 | 10/1/2044 | R$128,434.13 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| Nova Era Integração | MILAGRES | EL 230 kV MILAGRES LT 230 kV ABAIARA /MILAGRES C-2 CE | RB | FT LT 230 kV ABAIARA /MILAGRES C-2 CE | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,363,033.29 | 6/1/2025 | Prevista | T2024-197-C | LT 230 kV Abaiara - Milagres - C2Seccionamento da LT 230 kV Milagres – Crato II – C1 na subestação Abaiara. | ||||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV ABAIARA /MILAGRES C-1 CE | RB | FT LT 230 kV ABAIARA /MILAGRES C-1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV ABAIARA /MILAGRES C-1 CE | RB | FT LT 230 kV ABAIARA /MILAGRES C-1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$596,907.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV ABAIARA /MILAGRES C-1 CE | RB | FT LT 230 kV ABAIARA /MILAGRES C-1 CE | 061/2001 | IPCA | RMEL | REN 443/2011 | 1/23/2016 | 1/25/2046 | R$12,517.14 | 6/1/2025 | Ativa | Substituído TPC TEM230H com vida regulatória esgotada. Posição Operacional: 84L2-C/MLG. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | EL 230 kV MILAGRES LT 230 kV ABAIARA /MILAGRES C-1 CE | RB | FT LT 230 kV ABAIARA /MILAGRES C-1 CE | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/10/2021 | 11/13/2051 | R$38,550.39 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MILAGRES | EL 13,8 kV MILAGRES DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | EL 13,8 kV MILAGRES DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | EL 13,8 kV MILAGRES DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | EL 13,8 kV MILAGRES DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | EL 13,8 kV MILAGRES DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | CE 58/-35 Mvar MILAGRES CE2 CE | RB | FT CE 58/-35 MvAr MILAGRES CE1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,477,035.39 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | CE 58/-35 Mvar MILAGRES CE2 CE | RB | FT CE 58/-35 MvAr MILAGRES CE1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,144,810.86 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | CE 58/-35 Mvar MILAGRES CE2 CE | RB | FT CE 58/-35 MvAr MILAGRES CE1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 3,821,009.20 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | CE 58/-35 Mvar MILAGRES CE1 CE | RB | FT CE 58/-35 MvAr MILAGRES CE1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,477,035.39 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | CE 58/-35 Mvar MILAGRES CE1 CE | RB | FT CE 58/-35 MvAr MILAGRES CE1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,144,810.86 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | CE 58/-35 Mvar MILAGRES CE1 CE | RB | FT CE 58/-35 MvAr MILAGRES CE1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 3,821,009.20 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | BC 69 kV 25,2 Mvar MILAGRES BC1 CE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$107,937.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MILAGRES | BC 230 kV 50,5 Mvar MILAGRES BC2 CE | RB | FT BC 230 kV 50,5 MVAr MILAGRES BC2 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$191,630.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | BC 230 kV 50,5 Mvar MILAGRES BC2 CE | RB | FT BC 230 kV 50,5 MVAr MILAGRES BC2 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$537,748.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | BC 230 kV 50,5 Mvar MILAGRES BC1 CE | RB | FT BC 230 kV 50,5 MVAr MILAGRES BC1 CE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$191,630.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES | BC 230 kV 50,5 Mvar MILAGRES BC1 CE | RB | FT BC 230 kV 50,5 MVAr MILAGRES BC1 CE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$537,748.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MILAGRES II | MG 500 kV MILAGRES II MIGA2 CE | RB | FT MG 500 kV MILAGRES II MIGA2 CE | 061/2001 | IPCA | RBNIA | REA 8771/2020 | R$526,620.68 | 6/1/2025 | Prevista | T2019-090 | Instalação, na SE Milagres II, de um módulo de infraestrutura geral para acessante, em 500 kV. | ||||
| AXIA Energia Nordeste | MILAGRES II | MG 500 kV MILAGRES II MIGA2 CE | RB | FT MG 500 kV MILAGRES II MIGA2 CE | 061/2001 | IPCA | RBNIA | REA 8771/2020 | R$604,044.72 | 6/1/2025 | Prevista | T2019-090 | Complementação do MIGA da SE Milagres II com a instalação de um módulo de infraestrutura de manobra, em 500 kV, associado ao seccionamento da LT 500 kV LG - Milagres C1. | ||||
| AXIA Energia Nordeste | MILAGRES II | MG 500 kV MILAGRES II MIGA2 CE | RB | FT MG 500 kV MILAGRES II MIGA2 CE | 061/2001 | IPCA | RBNIA | REA 8771/2020 | R$ 2,127,900.16 | 6/1/2025 | Prevista | T2019-090 | Desmontagem do RL 500 kV, e conexão, da SE Milagres, e montagem na SE Milagres II; e remanejamento da SE Milagres para SE Milagres II, relacionados ao seccionamento da LT 500 kV Luiz Gonzaga - Milagres C1 na SE Milagres II. | ||||
| AXIA Energia Nordeste | MILAGRES II | IB 500 kV MG 500 kV MILAGRES II MIGA2 CE IB2 | RB | FT MG 500 kV MILAGRES II MIGA2 CE | 061/2001 | IPCA | RBNIA | REA 8771/2020 | R$ 1,730,148.68 | 6/1/2025 | Prevista | T2019-090 | Instalação, na SE Milagres II, de uma interligação de barras em 500 kV, arranjo DJM. | ||||
| AXIA Energia Nordeste | MILAGRES II | EL 500 kV MILAGRES II LT 500 kV US. L.GONZAGA /MILAGRES II C-1 PE/CE | RB | FT LT 500 kV US. L.GONZAGA /MILAGRES II C-1 PE/CE | 061/2001 | IPCA | RBNIA | REA 8771/2020 | R$ 1,633,991.80 | 6/1/2025 | Prevista | T2019-090 | Instalar, na SE MILAGRES II, um módulo de entrada de linha para o circuito LT 500 kV US. L.GONZAGA /MILAGRES II C-1 PE/CE originado do seccionamento do circuito LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE na SE MILAGRES II. | ||||
| AXIA Energia Nordeste | MILAGRES II | EL 500 kV MILAGRES II LT 500 kV MILAGRES II /MILAGRES C-1 CE | RB | FT LT 500 kV MILAGRES II /MILAGRES C-1 CE | 061/2001 | IPCA | RBNIA | REA 8771/2020 | R$ 1,633,991.80 | 6/1/2025 | Prevista | T2019-090 | Instalar, na SE MILAGRES II, um módulo de entrada de linha para o circuito LT 500 kV MILAGRES II /MILAGRES C-1 CE originado do seccionamento do circuito LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE na SE MILAGRES II. | ||||
| AXIA Energia Norte | MIRACEMA | TR 500/138 kV MIRACEMA TRR1 TO | RBF | FT TR 500/138 kV MIRACEMA TRR1 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$435,951.35 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | TR 500/138 kV MIRACEMA TR2 TO | RBF | FT TR 500/138 kV MIRACEMA TR2 TO | 058/2001 | IPCA | RBNI | REA 2911/2011 | 10/8/2013 | 9/15/2048 | R$ 3,783,698.97 | 6/1/2025 | Ativa | T2011-001 | Instalar na SE Miracema do segundo banco de transformadores monofásicos TR2 500/138/13,8 kV, 3x60 MVA. (Alterado pela REA 3.086, de 30/08/2011, e pela REA 3.150, de 11/10/2011) *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRACEMA | TR 500/138 kV MIRACEMA TR2 TO | RBF | FT TR 500/138 kV MIRACEMA TR2 TO | 058/2001 | IPCA | RMEL | REN 905/2020 | 6/22/2021 | 5/30/2056 | R$45,657.05 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MIRACEMA | TR 500/138 kV MIRACEMA TF1 TO | RBF | FT TR 500/138 kV MIRACEMA TF1 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,307,854.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | TR 500/138 kV MIRACEMA TF1 TO | RBF | FT TR 500/138 kV MIRACEMA TF1 TO | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 12/19/2015 | 12/18/2030 | R$31,924.33 | 6/1/2025 | Ativa | Implantacao de sistema de medicao e monitoramento online de Buchas Condensivas do equipamento MCTF701 para integrar ao SISTEMA DE SUPERVISAO SAGE Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MIRACEMA | TR 138/13,8 kV MIRACEMA TF1 TO | RB | FT MG 500 kV MIRACEMA MG1 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$33,762.50 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | RTN 69 kV 0 Mvar MIRACEMA RN2 TO | RB | FT LT 500 kV GURUPI /MIRACEMA C-1 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$16,446.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | RTN 69 kV 0 Mvar MIRACEMA RN1 TO | RB | FT LT 500 kV COLINAS /MIRACEMA C-1 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$16,446.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | RTL 500 kV 45,5 Mvar MIRACEMA RTR2 TO | RB | FT RTL 500 kV 45,5 Mvar MIRACEMA RTR2 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$298,269.38 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | RTL 500 kV 45,5 Mvar MIRACEMA RTR2 TO | RB | FT RTL 500 kV 45,5 Mvar MIRACEMA RTR2 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$647,520.08 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | RTL 500 kV 45,5 Mvar MIRACEMA RTR2 TO | RB | FT RTL 500 kV 45,5 Mvar MIRACEMA RTR2 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$621,034.58 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | RTL 500 kV 45,45 Mvar MIRACEMA RTR1 TO | RB | FT RTL 500 kV 45,45 MVAr MIRACEMA RTR1 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$298,162.12 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | RTL 500 kV 45,45 Mvar MIRACEMA RTR1 TO | RB | FT RTL 500 kV 45,45 MVAr MIRACEMA RTR1 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$647,287.22 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | RTL 500 kV 45,45 Mvar MIRACEMA RTR1 TO | RB | FT RTL 500 kV 45,45 MVAr MIRACEMA RTR1 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$620,811.24 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | RTL 500 kV 136 Mvar MIRACEMA RT2 TO | RB | FT LT 500 kV GURUPI /MIRACEMA C-1 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$893,734.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | RTL 500 kV 136 Mvar MIRACEMA RT2 TO | RB | FT LT 500 kV GURUPI /MIRACEMA C-1 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,940,228.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | RTL 500 kV 136 Mvar MIRACEMA RT2 TO | RB | FT LT 500 kV GURUPI /MIRACEMA C-1 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,860,867.52 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | RTL 500 kV 136 Mvar MIRACEMA RT1 TO | RB | FT LT 500 kV COLINAS /MIRACEMA C-1 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$893,734.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | RTL 500 kV 136 Mvar MIRACEMA RT1 TO | RB | FT LT 500 kV COLINAS /MIRACEMA C-1 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,940,228.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | RTL 500 kV 136 Mvar MIRACEMA RT1 TO | RB | FT LT 500 kV COLINAS /MIRACEMA C-1 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,860,867.52 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | RTL 500 kV 136 Mvar MIRACEMA RT1 TO | RB | FT LT 500 kV COLINAS /MIRACEMA C-1 TO | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 11/17/2020 | 11/16/2035 | R$42,430.78 | 6/1/2025 | Ativa | Implantacao de sistema de medicao e monitoramento online de Buchas Condensivas do equipamento MCRE701 para integrar ao SISTEMA DE SUPERVISAO SAGE Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MIRACEMA | RTB 500 kV 136 Mvar MIRACEMA RT3 TO | RB | FT RTB 500 kV 136 Mvar MIRACEMA RT3 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$893,734.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | RTB 500 kV 136 Mvar MIRACEMA RT3 TO | RB | FT RTB 500 kV 136 Mvar MIRACEMA RT3 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,940,228.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | RTB 500 kV 136 Mvar MIRACEMA RT3 TO | RB | FT RTB 500 kV 136 Mvar MIRACEMA RT3 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,860,867.52 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | MG 500 kV MIRACEMA MG1 TO | RB | FT MG 500 kV MIRACEMA MG1 TO | 058/2001 | IPCA | RBNI | REA 2911/2011 | 10/8/2013 | 6/28/2041 | R$739,700.71 | 6/1/2025 | Ativa | T2011-001 | Complementação na SE Miracema da infraestrutura de módulo geral pela instalação do segundo banco de transformadores monofásicos TR2 500/138/13,8 kV, 3x60 MVA *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRACEMA | MG 500 kV MIRACEMA MG1 TO | RB | FT MG 500 kV MIRACEMA MG1 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$594,386.51 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | MG 500 kV MIRACEMA MG1 TO | RB | FT MG 500 kV MIRACEMA MG1 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,290,367.78 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | MG 500 kV MIRACEMA MG1 TO | RB | FT MG 500 kV MIRACEMA MG1 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,237,587.89 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | MG 500 kV MIRACEMA MG1 TO | RB | FT MG 500 kV MIRACEMA MG1 TO | 058/2001 | IPCA | RBNI | REA 6502/2017 | 10/18/2019 | 1/5/2049 | R$30,951.74 | 6/1/2025 | Ativa | T2017-046-A | Complemento do módulo de infraestrutura de manobra em área de 645 m2. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRACEMA | MG 500 kV MIRACEMA MG1 TO | RB | FT MG 500 kV MIRACEMA MG1 TO | 058/2001 | IPCA | RMEL | REN 905/2020 | 5/10/2013 | 10/7/2034 | R$59,667.86 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MIRACEMA | MG 500 kV MIRACEMA MG1 TO | RB | FT MG 500 kV MIRACEMA MG1 TO | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 1/31/2023 | 6/12/2053 | R$59,609.84 | 6/1/2025 | Ativa | MODERNIZAÇÃO - AMPLIFICADOR OPTICO RAMAN - 30 DBM 4U - 01ROA4C301AWAH Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MIRACEMA | MC 500 kV TR 500/138 kV MIRACEMA TR2 TO | RBF | FT TR 500/138 kV MIRACEMA TR2 TO | 058/2001 | IPCA | RBNI | REA 2911/2011 | 10/8/2013 | 7/15/2045 | R$ 1,578,475.99 | 6/1/2025 | Ativa | T2011-001 | Instalar na SE Miracema um módulo de conexão 500 kV, arranjo disjuntor e meio, para o segundo banco de transformadores monofásicos TR2 500/138/13,8 kV, 3x60 MVA *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRACEMA | MC 500 kV TR 500/138 kV MIRACEMA TF1 TO | RBF | FT TR 500/138 kV MIRACEMA TF1 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$494,028.38 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | MC 500 kV RTL 500 kV 136 Mvar MIRACEMA RT2 TO | RB | FT LT 500 kV GURUPI /MIRACEMA C-1 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$299,304.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | MC 500 kV RTL 500 kV 136 Mvar MIRACEMA RT1 TO | RB | FT LT 500 kV COLINAS /MIRACEMA C-1 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$299,304.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | MC 500 kV RTB 500 kV 136 Mvar MIRACEMA RT3 TO | RB | FT RTB 500 kV 136 Mvar MIRACEMA RT3 TO | 058/2001 | IPCA | RBNI | REA 6502/2017 | 7/9/2019 | 8/29/2052 | R$413,198.97 | 6/1/2025 | Ativa | T2017-046-A | Obra de Substituição Completa - Instalação de módulo de conexão do banco de reatores com disjuntor e desmontagem da conexão existente. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRACEMA | MC 500 kV RTB 500 kV 136 Mvar MIRACEMA RT3 TO | RB | FT RTB 500 kV 136 Mvar MIRACEMA RT3 TO | 058/2001 | IPCA | RBNI | REA 5861/2016 | 6/3/2019 | 6/2/2047 | R$134,799.35 | 6/1/2025 | Ativa | Implantação de Esquema de inserção/desinserção automática do reator de barra na SE. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | MIRACEMA | MC 500 kV RTB 500 kV 136 Mvar MIRACEMA RT3 TO | RB | FT RTB 500 kV 136 Mvar MIRACEMA RT3 TO | 058/2001 | IPCA | RMEL | REN 905/2020 | 12/29/2020 | 12/28/2053 | R$211,194.96 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MIRACEMA | MC 500 kV CR 500 kV 361,5 Mvar MIRACEMA BC1 TO | RB | FT CR 500 kV 361,5 Mvar MIRACEMA BC1 TO | 058/2001 | IPCA | RBNI | REA 6502/2017 | 10/14/2019 | 6/25/2052 | R$ 1,062,160.90 | 6/1/2025 | Ativa | T2017-046-A | Obra de Substituição Completa - Instalação de módulo de conexão do banco de capacitores e desmontagem do existente. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRACEMA | MC 500 kV CR 500 kV 361,5 Mvar MIRACEMA BC1 TO | RB | FT CR 500 kV 361,5 Mvar MIRACEMA BC1 TO | 058/2001 | IPCA | RMEL | REN 905/2020 | 12/29/2020 | 12/7/2055 | R$20,599.49 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MIRACEMA | MC 138 kV TR 500/138 kV MIRACEMA TR2 TO | RBF | FT TR 500/138 kV MIRACEMA TR2 TO | 058/2001 | IPCA | RBNI | REA 2911/2011 | 10/8/2013 | 12/23/2043 | R$767,207.22 | 6/1/2025 | Ativa | T2011-001 | Instalação na SE Miracema de um módulo de conexão 138 kV, arranjo barra dupla a quatro chaves, para o segundo banco de transformadores monofásicos TR2 500/138/13,8 kV, 3x60 MVA *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRACEMA | MC 138 kV TR 500/138 kV MIRACEMA TF1 TO | RBF | FT TR 500/138 kV MIRACEMA TF1 TO | 058/2001 | IPCA | RBNI | REA 2911/2011 | 11/27/2013 | 11/26/2041 | R$66,492.96 | 6/1/2025 | Ativa | T2011-001 | Instalação na SE Miracema de painel com sistema de controle específico para o paralelismo do autotransformador existente com o autotransformador a ser implantado, no setor de 138 kV; *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRACEMA | MC 138 kV TR 500/138 kV MIRACEMA TF1 TO | RBF | FT TR 500/138 kV MIRACEMA TF1 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,943.07 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | MC 138 kV TR 138/13,8 kV MIRACEMA TF1 TO | RB | FT MG 500 kV MIRACEMA MG1 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,943.07 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | IB 500 kV MG 500 kV MIRACEMA MG1 TO IB5 | RB | FT MG 500 kV MIRACEMA MG1 TO | 058/2001 | IPCA | RBNI | REA 2911/2011 | 10/8/2013 | 3/5/2045 | R$ 1,476,514.64 | 6/1/2025 | Ativa | T2011-001 | Instalação na SE Miracema de um módulo de interligação de barras em 500 kV, arranjo disjuntor e meio *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRACEMA | IB 500 kV MG 500 kV MIRACEMA MG1 TO IB2 | RB | FT MG 500 kV MIRACEMA MG1 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$524,269.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | IB 500 kV MG 500 kV MIRACEMA MG1 TO IB1 | RB | FT MG 500 kV MIRACEMA MG1 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$524,269.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | IB 500 kV MG 500 kV MIRACEMA MG1 TO IB1 | RB | FT MG 500 kV MIRACEMA MG1 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,138,149.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | IB 500 kV MG 500 kV MIRACEMA MG1 TO IB1 | RB | FT MG 500 kV MIRACEMA MG1 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,091,595.86 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | EL 500 kV MIRACEMA LT 500 kV GURUPI /MIRACEMA C-1 TO | RB | FT LT 500 kV GURUPI /MIRACEMA C-1 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$559,746.88 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | EL 500 kV MIRACEMA LT 500 kV GURUPI /MIRACEMA C-1 TO | RB | FT LT 500 kV GURUPI /MIRACEMA C-1 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,215,167.79 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | EL 500 kV MIRACEMA LT 500 kV GURUPI /MIRACEMA C-1 TO | RB | FT LT 500 kV GURUPI /MIRACEMA C-1 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,165,463.80 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | EL 500 kV MIRACEMA LT 500 kV GURUPI /MIRACEMA C-1 TO | RB | FT LT 500 kV GURUPI /MIRACEMA C-1 TO | 058/2001 | IPCA | RBNI | REA 6502/2017 | 5/17/2019 | 2/26/2048 | R$207,760.32 | 6/1/2025 | Ativa | T2017-046-A | Adequação do módulo de entrada de linha 500 kV, com a aquisição e instalação de 3 para-raios e 3 TP e desmontagem do existente para viabilizar a substituição do Banco de Capacitores Série. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRACEMA | EL 500 kV MIRACEMA LT 500 kV GURUPI /MIRACEMA C-1 TO | RB | FT LT 500 kV GURUPI /MIRACEMA C-1 TO | 058/2001 | IPCA | RMEL | REN 905/2020 | 12/19/2020 | 5/25/2054 | R$92,538.87 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MIRACEMA | EL 500 kV MIRACEMA LT 500 kV COLINAS /MIRACEMA C-1 TO | RB | FT LT 500 kV COLINAS /MIRACEMA C-1 TO | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$559,746.88 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | EL 500 kV MIRACEMA LT 500 kV COLINAS /MIRACEMA C-1 TO | RB | FT LT 500 kV COLINAS /MIRACEMA C-1 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,215,167.79 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | EL 500 kV MIRACEMA LT 500 kV COLINAS /MIRACEMA C-1 TO | RB | FT LT 500 kV COLINAS /MIRACEMA C-1 TO | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,165,463.80 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRACEMA | CR 500 kV 361,5 Mvar MIRACEMA BC1 TO | RB | FT CR 500 kV 361,5 Mvar MIRACEMA BC1 TO | 058/2001 | IPCA | RBNI | REA 6502/2017 | 10/14/2019 | 4/15/2040 | R$ 4,828,406.57 | 6/1/2025 | Ativa | T2017-046-A | Obra de Substituição Completa - Substituição do Banco de Capacitores série, localizado na saída de linha da LT 500 KV Miracema - Gurupi C1, de 23,8 O e IN=1500 A, por outro de mesmo valor öhmico e IN=2000 A. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRACEMA | CR 500 kV 361,5 Mvar MIRACEMA BC1 TO | RB | FT CR 500 kV 361,5 Mvar MIRACEMA BC1 TO | 058/2001 | IPCA | RMEL | REN 905/2020 | 12/29/2020 | 12/7/2055 | R$11,568.72 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MIRAMAR | TR 230/69 kV MIRAMAR TR3 PA | RBF | FT TR 230/69 kV MIRAMAR TR3 PA | 012/2011 | IPCA | RBL | CC 012/2011 | 4/25/2016 | 12/9/2041 | R$895,755.90 | 6/1/2025 | Ativa | T2012-034-C | RAP associada ao terceiro transformador trifásico 230/69 kV, de 150 MVA, da subestação Miramar II, incluído no objeto do Contrato de Concessão de Transmissão nº 012/2011 por meio do primeiro termo aditivo a este Contrato de Concessão. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | MIRAMAR | TR 230/69 kV MIRAMAR TR2 PA | RBF | FT TR 230/69 kV MIRAMAR TR2 PA | 012/2011 | IPCA | RBL | CC 012/2011 | 4/25/2016 | 12/9/2041 | R$588,728.18 | 6/1/2025 | Ativa | T2012-034-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | MIRAMAR | TR 230/69 kV MIRAMAR TR1 PA | RBF | FT TR 230/69 kV MIRAMAR TR1 PA | 012/2011 | IPCA | RBL | CC 012/2011 | 4/25/2016 | 12/9/2041 | R$588,728.18 | 6/1/2025 | Ativa | T2012-034-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | MIRAMAR | MG 230 kV MIRAMAR MG2 PA | RB | FT MG 230 kV MIRAMAR MG2 PA | 058/2001 | IPCA | RBNI | REA 3362/2012 | 4/19/2016 | 5/20/2047 | R$504,313.92 | 6/1/2025 | Ativa | T2012-013 | Instalar módulo de infra estrutura geral de manobra para duas entradas de linha e módulo de infraestrutura geral para acessante sem considerar o serviço auxiliar. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRAMAR | MG 230 kV MIRAMAR MG2 PA | RB | FT MG 230 kV MIRAMAR MG2 PA | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 3/13/2022 | 3/12/2039 | R$44,387.93 | 6/1/2025 | Ativa | SUSBTITUICAO DOS BANCOS DE BATERIAS 125 VCC 600 AH Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MIRAMAR | MG 230 kV MIRAMAR MG1 PA | RB | FT MG 230 kV MIRAMAR MG1 PA | 012/2011 | IPCA | RBL | CC 012/2011 | 4/25/2016 | 12/9/2041 | R$435,754.10 | 6/1/2025 | Ativa | T2012-034-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | MIRAMAR | MC 69 kV TR 230/69 kV MIRAMAR TR3 PA | RBF | FT TR 230/69 kV MIRAMAR TR3 PA | 012/2011 | IPCA | RBL | CC 012/2011 | 4/25/2016 | 12/9/2041 | R$127,761.55 | 6/1/2025 | Ativa | T2012-034-C | RAP associada ao terceiro transformador trifásico 230/69 kV, de 150 MVA, da subestação Miramar II, incluído no objeto do Contrato de Concessão de Transmissão nº 012/2011 por meio do primeiro termo aditivo a este Contrato de Concessão. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | MIRAMAR | MC 69 kV TR 230/69 kV MIRAMAR TR2 PA | RBF | FT TR 230/69 kV MIRAMAR TR2 PA | 012/2011 | IPCA | RBL | CC 012/2011 | 4/25/2016 | 12/9/2041 | R$83,970.23 | 6/1/2025 | Ativa | T2012-034-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | MIRAMAR | MC 69 kV TR 230/69 kV MIRAMAR TR1 PA | RBF | FT TR 230/69 kV MIRAMAR TR1 PA | 012/2011 | IPCA | RBL | CC 012/2011 | 4/25/2016 | 12/9/2041 | R$83,970.23 | 6/1/2025 | Ativa | T2012-034-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | MIRAMAR | MC 230 kV TR 230/69 kV MIRAMAR TR3 PA | RBF | FT TR 230/69 kV MIRAMAR TR3 PA | 012/2011 | IPCA | RBL | CC 012/2011 | 4/25/2016 | 12/9/2041 | R$314,128.94 | 6/1/2025 | Ativa | T2012-034-C | RAP associada ao terceiro transformador trifásico 230/69 kV, de 150 MVA, da subestação Miramar II, incluído no objeto do Contrato de Concessão de Transmissão nº 012/2011 por meio do primeiro termo aditivo a este Contrato de Concessão. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | MIRAMAR | MC 230 kV TR 230/69 kV MIRAMAR TR2 PA | RBF | FT TR 230/69 kV MIRAMAR TR2 PA | 012/2011 | IPCA | RBL | CC 012/2011 | 4/25/2016 | 12/9/2041 | R$206,458.66 | 6/1/2025 | Ativa | T2012-034-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | MIRAMAR | MC 230 kV TR 230/69 kV MIRAMAR TR1 PA | RBF | FT TR 230/69 kV MIRAMAR TR1 PA | 012/2011 | IPCA | RBL | CC 012/2011 | 4/25/2016 | 12/9/2041 | R$206,458.66 | 6/1/2025 | Ativa | T2012-034-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | MIRAMAR | IB 69 kV MG 230 kV MIRAMAR MG1 PA IB1 | DIT | 012/2011 | IPCA | RPEC | CC 012/2011 | 4/25/2016 | 12/9/2041 | R$201,778.34 | 6/1/2025 | Ativa | T2012-034-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Norte | MIRAMAR | IB 230 kV MG 230 kV MIRAMAR MG1 PA IB1 | RB | FT MG 230 kV MIRAMAR MG1 PA | 012/2011 | IPCA | RBL | CC 012/2011 | 4/25/2016 | 12/9/2041 | R$156,430.41 | 6/1/2025 | Ativa | T2012-034-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | MIRAMAR | EL 69 kV MIRAMAR DIST7 | DIT | 012/2011 | IPCA | RPEC | CC 012/2011 | 4/25/2016 | 12/9/2041 | R$343,729.38 | 6/1/2025 | Ativa | T2012-034-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Norte | MIRAMAR | EL 69 kV MIRAMAR DIST6 | DIT | 012/2011 | IPCA | RPEC | CC 012/2011 | 4/25/2016 | 12/9/2041 | R$343,729.38 | 6/1/2025 | Ativa | T2012-034-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Norte | MIRAMAR | EL 69 kV MIRAMAR DIST5 | DIT | 012/2011 | IPCA | RPEC | CC 012/2011 | 4/25/2016 | 12/9/2041 | R$343,729.38 | 6/1/2025 | Ativa | T2012-034-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Norte | MIRAMAR | EL 69 kV MIRAMAR DIST4 | DIT | 012/2011 | IPCA | RPEC | CC 012/2011 | 4/25/2016 | 12/9/2041 | R$343,729.38 | 6/1/2025 | Ativa | T2012-034-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Norte | MIRAMAR | EL 69 kV MIRAMAR DIST3 | DIT | 012/2011 | IPCA | RPEC | CC 012/2011 | 4/25/2016 | 12/9/2041 | R$343,729.38 | 6/1/2025 | Ativa | T2012-034-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Norte | MIRAMAR | EL 69 kV MIRAMAR DIST2 | DIT | 012/2011 | IPCA | RPEC | CC 012/2011 | 4/25/2016 | 12/9/2041 | R$343,729.38 | 6/1/2025 | Ativa | T2012-034-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Norte | MIRAMAR | EL 69 kV MIRAMAR DIST1 | DIT | 012/2011 | IPCA | RPEC | CC 012/2011 | 4/25/2016 | 12/9/2041 | R$293,829.26 | 6/1/2025 | Ativa | T2012-034-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Norte | MIRAMAR | EL 230 kV MIRAMAR LT 230 kV UTINGA /MIRAMAR C-2 PA | RB | FT LT 230 kV UTINGA /MIRAMAR C-2 PA | 058/2001 | IPCA | RBNI | REA 3362/2012 | 4/19/2016 | 4/20/2046 | R$ 1,079,772.23 | 6/1/2025 | Ativa | T2012-013 | Instalar uma entrada de linha 230 kV, arranjo barra dupla a quatro chaves para o primeiro circuito da LT Utinga - Miramar. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRAMAR | EL 230 kV MIRAMAR LT 230 kV UTINGA /MIRAMAR C-1 PA | RB | FT LT 230 kV UTINGA /MIRAMAR C-1 PA | 058/2001 | IPCA | RBNI | REA 3362/2012 | 4/19/2016 | 8/13/2046 | R$ 1,079,740.92 | 6/1/2025 | Ativa | T2012-013 | Instalar uma entrada de linha 230 kV, arranjo barra dupla a quatro chaves para o primeiro circuito da LT Utinga - Miramar. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRANDA II | TT 69/0 kV MIRANDA II TT1 MA | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$105,427.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MIRANDA II | TR 500/230 kV MIRANDA II TRR1 MA | RB | FT TR 500/230 kV MIRANDA II TRR1 MA | 002/2009 | IPCA | RBL | CC 002/2009 | 12/8/2010 | 1/28/2039 | R$ 1,081,782.28 | 6/1/2025 | Ativa | T2009-196 | Contrato de Concessão nº 002/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | MIRANDA II | TR 500/230 kV MIRANDA II TR2 MA | RB | FT TR 500/230 kV MIRANDA II TR2 MA | 002/2009 | IPCA | RBNI | REA 6219/2017 | 3/10/2019 | 7/2/2053 | R$ 5,019,059.48 | 6/1/2025 | Ativa | T2016-096 | Instalação na SE Miranda II do Segundo Autotransformador 500/230/13,8 kV - 3x 150 MVA *(Receita revisada em 27/06/2024) | ||
| AXIA Energia Norte | MIRANDA II | TR 500/230 kV MIRANDA II TR1 MA | RB | FT TR 500/230 kV MIRANDA II TR1 MA | 002/2009 | IPCA | RBL | CC 002/2009 | 12/8/2010 | 1/28/2039 | R$ 3,245,346.83 | 6/1/2025 | Ativa | T2009-196 | Contrato de Concessão nº 002/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | MIRANDA II | TR 500/230 kV MIRANDA II TR1 MA | RB | FT TR 500/230 kV MIRANDA II TR1 MA | 002/2009 | IPCA | RMEL | REN 443/2011 | 9/19/2017 | 9/11/2032 | R$46,502.89 | 6/1/2025 | Ativa | Implantação de sistema de medição e monitoramento on-line de Buchas Condensivas do equipamento MRAT-01 para integrar ao SISTEMA DE SUPERVISÃO SAGE.* Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Norte | MIRANDA II | TR 230/69 kV MIRANDA II TR3 MA | RBF | FT TR 230/69 kV MIRANDA II TR3 MA | 058/2001 | IPCA | RBNI | REA 9901/2021 | 1/8/2024 | 1/7/2049 | R$ 1,714,250.03 | 6/1/2025 | Ativa | T2020-022 | Instalar, na SE MIRANDA II, de uma transformação trifásica TR3 230/69-13,8 KV - 100 MVA. | ||
| AXIA Energia Norte | MIRANDA II | TR 230/69 kV MIRANDA II TF2 MA | RBF | FT TR 230/69 kV MIRANDA II TF2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$421,097.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | TR 230/69 kV MIRANDA II TF2 MA | RBF | FT TR 230/69 kV MIRANDA II TF2 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$914,171.16 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | TR 230/69 kV MIRANDA II TF2 MA | RBF | FT TR 230/69 kV MIRANDA II TF2 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$876,778.84 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | TR 230/69 kV MIRANDA II TF2 MA | RBF | FT TR 230/69 kV MIRANDA II TF2 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 12/1/2022 | 11/8/2057 | R$86,024.11 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MIRANDA II | TR 230/69 kV MIRANDA II TF1 MA | RBF | FT TR 230/69 kV MIRANDA II TF1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$421,097.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | TR 230/69 kV MIRANDA II TF1 MA | RBF | FT TR 230/69 kV MIRANDA II TF1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$914,171.16 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | TR 230/69 kV MIRANDA II TF1 MA | RBF | FT TR 230/69 kV MIRANDA II TF1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$876,778.84 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | TR 230/69 kV MIRANDA II TF1 MA | RBF | FT TR 230/69 kV MIRANDA II TF1 MA | 058/2001 | IPCA | RMEL | REN 443/2011 | 3/19/2017 | 3/18/2032 | R$47,047.69 | 6/1/2025 | Ativa | Implantação de sistema de medição e monitoramento on-line de Buchas Condensivas do equipamento MRTF6-01 para integrar ao SISTEMA DE SUPERVISÃO SAGE. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | MIRANDA II | TR 230/69 kV MIRANDA II TF1 MA | RBF | FT TR 230/69 kV MIRANDA II TF1 MA | 058/2001 | IPCA | RMEL | REN 443/2011 | 10/29/2017 | 10/28/2041 | R$20,307.66 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DOS PARA-RAIOS DE 230 kV, FASES A, B E V. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | MIRANDA II | TR 230/138 kV MIRANDA II TR3 MA | RBF | FT TR 230/138 kV MIRANDA II TR3 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$441,967.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | TR 230/138 kV MIRANDA II TR2 MA | RBF | FT TR 230/138 kV MIRANDA II TR2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$441,967.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | TR 230/138 kV MIRANDA II TR1 MA | RBF | FT TR 230/138 kV MIRANDA II TR1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$441,967.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | TR 230/138 kV MIRANDA II TR1 MA | RBF | FT TR 230/138 kV MIRANDA II TR1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$959,477.94 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | TR 230/138 kV MIRANDA II TR1 MA | RBF | FT TR 230/138 kV MIRANDA II TR1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$920,232.44 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | RTB 500 kV 45,33 Mvar MIRANDA II RTR1 MA | RB | FT RTB 500 kV 45,33 Mvar MIRANDA II RTR1 MA | 002/2009 | IPCA | RBL | CC 002/2009 | 12/8/2010 | 1/28/2039 | R$513,590.57 | 6/1/2025 | Ativa | T2009-196 | Contrato de Concessão nº 002/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | MIRANDA II | RTB 500 kV 136 Mvar MIRANDA II RT1 MA | RB | FT RTB 500 kV 136 Mvar MIRANDA II RT1 MA | 002/2009 | IPCA | RBL | CC 002/2009 | 12/8/2010 | 1/28/2039 | R$ 1,540,768.04 | 6/1/2025 | Ativa | T2009-196 | Contrato de Concessão nº 002/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | MIRANDA II | RTB 230 kV 10 Mvar MIRANDA II RT2 MA | RB | FT RTB 230 kV 10 MVAr MIRANDA II RT2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$228,867.56 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | RTB 230 kV 10 Mvar MIRANDA II RT2 MA | RB | FT RTB 230 kV 10 MVAr MIRANDA II RT2 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$496,854.03 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | RTB 230 kV 10 Mvar MIRANDA II RT2 MA | RB | FT RTB 230 kV 10 MVAr MIRANDA II RT2 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$476,531.22 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | RTB 230 kV 10 Mvar MIRANDA II RT2 MA | RB | FT RTB 230 kV 10 MVAr MIRANDA II RT2 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 12/30/2020 | 1/2/2051 | R$49,140.10 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MIRANDA II | RTB 230 kV 10 Mvar MIRANDA II RT1 MA | RB | FT RTB 230 kV 10 MVAr MIRANDA II RT1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$228,867.56 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | RTB 230 kV 10 Mvar MIRANDA II RT1 MA | RB | FT RTB 230 kV 10 MVAr MIRANDA II RT1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$496,854.03 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | RTB 230 kV 10 Mvar MIRANDA II RT1 MA | RB | FT RTB 230 kV 10 MVAr MIRANDA II RT1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$476,531.22 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | MG 500 kV MIRANDA II MG1 MA | RB | FT MG 500 kV MIRANDA II MG1 MA | 002/2009 | IPCA | RBL | CC 002/2009 | 12/8/2010 | 1/28/2039 | R$ 4,146,661.99 | 6/1/2025 | Ativa | T2009-196 | Contrato de Concessão nº 002/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | MIRANDA II | MG 500 kV MIRANDA II MG1 MA | RB | FT MG 500 kV MIRANDA II MG1 MA | 002/2009 | IPCA | RBNI | REA 6219/2017 | 3/10/2019 | 7/19/2048 | R$181,693.15 | 6/1/2025 | Ativa | T2016-096 | Modulo de Infra estrutura de Manobra 230 kV para instalação do AT2 *(Receita revisada em 27/06/2024) | ||
| AXIA Energia Norte | MIRANDA II | MG 230 kV MIRANDA II MG1 MA | RB | FT MG 230 kV MIRANDA II MG1 MA | 058/2001 | IPCA | RBNI | REA 2533/2010 | 11/16/2015 | 1/21/2046 | R$215,711.00 | 6/1/2025 | Ativa | T2010-015 | SE Miranda II - Adequação do módulo de infra etrutura geral 230 kV e acréscimo de modulo de infraestrura de manobra, para adequação de 12 módulos de manobra. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRANDA II | MG 230 kV MIRANDA II MG1 MA | RB | FT MG 230 kV MIRANDA II MG1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$806,582.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | MG 230 kV MIRANDA II MG1 MA | RB | FT MG 230 kV MIRANDA II MG1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,751,029.57 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | MG 230 kV MIRANDA II MG1 MA | RB | FT MG 230 kV MIRANDA II MG1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,679,407.24 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | MG 230 kV MIRANDA II MG1 MA | RB | FT MG 230 kV MIRANDA II MG1 MA | 058/2001 | IPCA | RBNI | REN 443/2011 | 6/29/2017 | 8/8/2045 | R$116,823.52 | 6/1/2025 | Ativa | Instalação de módulo de infraestrutura de manobra MIM associado à entrada de linha em 138kV, destinada a conexão de linha na SE Três Marias * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | MIRANDA II | MG 230 kV MIRANDA II MG1 MA | RB | FT MG 230 kV MIRANDA II MG1 MA | 058/2001 | IPCA | RBNI | REN 443/2011 | 10/27/2017 | 3/15/2047 | R$119,606.60 | 6/1/2025 | Ativa | Instalação de Módulo de Infraestrutura de Manobra 138 kV para a Entrada de Linha 138 kV - SE Santa Inês C2 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | MIRANDA II | MG 230 kV MIRANDA II MG1 MA | RB | FT MG 230 kV MIRANDA II MG1 MA | 058/2001 | IPCA | RBNI | REA 9901/2021 | 1/8/2024 | 1/7/2055 | R$154,547.35 | 6/1/2025 | Ativa | T2020-022 | Complementação dos Módulos de Infraestrutura Geral, (230 kV, BD4) para a instalação do 3° Transformador Trifásico, 230/69 kV - 100 MVA, na SE Miranda II. | ||
| AXIA Energia Norte | MIRANDA II | MG 230 kV MIRANDA II MG1 MA | RB | FT MG 230 kV MIRANDA II MG1 MA | 058/2001 | IPCA | RBNI | REA 9901/2021 | 1/8/2024 | 1/7/2055 | R$44,519.01 | 6/1/2025 | Ativa | T2020-022 | Complementação do Módulo de Infraestrutura Geral, (69 kV, BPT) para a instalação do 3° Transformador Trifásico, 230/69 kV - 100 MVA, na SE Miranda II. | ||
| AXIA Energia Norte | MIRANDA II | MG 230 kV MIRANDA II MG1 MA | RB | FT MG 230 kV MIRANDA II MG1 MA | 058/2001 | IPCA | RBNI | REA 9901/2021 | 1/8/2024 | 1/7/2042 | R$80,040.56 | 6/1/2025 | Ativa | T2020-022 | Adequação, na SE MIRANDA II, de um módulo geral MG1, em 230 kV, arranjo BD4, para a instalação do 3° transformador 230/69 kV, 100 MVA. | ||
| AXIA Energia Norte | MIRANDA II | MG 230 kV MIRANDA II MG1 MA | RB | FT MG 230 kV MIRANDA II MG1 MA | 058/2001 | IPCA | RBNI | DSP 622/2025 | 6/21/2024 | 6/20/2042 | R$71,568.34 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura Geral de Acessante -MIG-A 500 kV na SE Miranda II, em função do seccionamento dos circuitos 1 e 2 da LT 500 kV Presidente Dutra -São Luís II. | |||
| AXIA Energia Norte | MIRANDA II | MC 69 kV TT 69/0 kV MIRANDA II TT1 MA | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$31,250.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MIRANDA II | MC 69 kV TR 230/69 kV MIRANDA II TR3 MA | RBF | FT TR 230/69 kV MIRANDA II TR3 MA | 058/2001 | IPCA | RBNI | REA 9901/2021 | 1/8/2024 | 1/7/2051 | R$454,101.64 | 6/1/2025 | Ativa | T2020-022 | Instalar, na SE MIRANDA II, um módulo de conexão, em 69 kV, para o transformador trifásico TR3 230/69 kV - 100 MVA, arranjo Barra Principal e Transferência. | ||
| AXIA Energia Norte | MIRANDA II | MC 69 kV TR 230/69 kV MIRANDA II TF2 MA | RBF | FT TR 230/69 kV MIRANDA II TF2 MA | 058/2001 | IPCA | RBNI | REA 2533/2010 | 11/16/2015 | 11/15/2043 | R$70,808.15 | 6/1/2025 | Ativa | T2010-015 | SE Miranda II- Adequação de módulo de conexão, em 69 kV, do transformador TR2 230/69 kV, pela substituição do sistema de proteção e controle. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRANDA II | MC 69 kV TR 230/69 kV MIRANDA II TF2 MA | RBF | FT TR 230/69 kV MIRANDA II TF2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$74,722.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | MC 69 kV TR 230/69 kV MIRANDA II TF2 MA | RBF | FT TR 230/69 kV MIRANDA II TF2 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$162,216.23 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | MC 69 kV TR 230/69 kV MIRANDA II TF2 MA | RBF | FT TR 230/69 kV MIRANDA II TF2 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$155,581.11 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | MC 69 kV TR 230/69 kV MIRANDA II TF1 MA | RBF | FT TR 230/69 kV MIRANDA II TF1 MA | 058/2001 | IPCA | RBNI | REA 2533/2010 | 11/16/2015 | 11/15/2043 | R$70,808.15 | 6/1/2025 | Ativa | T2010-015 | SE Miranda II- Adequação de módulo de conexão, em 69 kV,do transformador TR1 230/69 kV, pela substituição do sistema de proteção e controle. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRANDA II | MC 69 kV TR 230/69 kV MIRANDA II TF1 MA | RBF | FT TR 230/69 kV MIRANDA II TF1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$74,722.22 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | MC 69 kV TR 230/69 kV MIRANDA II TF1 MA | RBF | FT TR 230/69 kV MIRANDA II TF1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$162,216.23 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | MC 69 kV TR 230/69 kV MIRANDA II TF1 MA | RBF | FT TR 230/69 kV MIRANDA II TF1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$155,581.11 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | MC 69 kV TR 230/69 kV MIRANDA II TF1 MA | RBF | FT TR 230/69 kV MIRANDA II TF1 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 2/14/2021 | 2/17/2051 | R$63,897.91 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MIRANDA II | MC 500 kV TR 500/230 kV MIRANDA II TR2 MA | RB | FT TR 500/230 kV MIRANDA II TR2 MA | 002/2009 | IPCA | RBNI | REA 6219/2017 | 3/10/2019 | 10/8/2050 | R$ 1,988,790.11 | 6/1/2025 | Ativa | T2016-096 | Instalação, na SE MIRANDA II, de um módulo de conexão, em 500 kV, para o autotransformador TR 500/230 kV MIRANDA II TR2 MA *(Receita revisada em 27/06/2024) | ||
| AXIA Energia Norte | MIRANDA II | MC 500 kV TR 500/230 kV MIRANDA II TR1 MA | RB | FT TR 500/230 kV MIRANDA II TR1 MA | 002/2009 | IPCA | RBL | CC 002/2009 | 12/8/2010 | 1/28/2039 | R$ 1,181,558.92 | 6/1/2025 | Ativa | T2009-196 | Contrato de Concessão nº 002/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | MIRANDA II | MC 500 kV RTB 500 kV 136 Mvar MIRANDA II RT1 MA | RB | FT RTB 500 kV 136 Mvar MIRANDA II RT1 MA | 002/2009 | IPCA | RBL | CC 002/2009 | 12/8/2010 | 1/28/2039 | R$ 1,049,188.96 | 6/1/2025 | Ativa | T2009-196 | Contrato de Concessão nº 002/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | MIRANDA II | MC 230 kV TR 500/230 kV MIRANDA II TR2 MA | RB | FT TR 500/230 kV MIRANDA II TR2 MA | 002/2009 | IPCA | RBNI | REA 6219/2017 | 3/10/2019 | 11/3/2052 | R$ 1,787,802.74 | 6/1/2025 | Ativa | T2016-096 | Instalação, na SE MIRANDA II, de um módulo de conexão, em 230 kV, para o autotransformador TR 500/230 kV MIRANDA II TR2 MA *(Receita revisada em 27/06/2024) | ||
| AXIA Energia Norte | MIRANDA II | MC 230 kV TR 500/230 kV MIRANDA II TR1 MA | RB | FT TR 500/230 kV MIRANDA II TR1 MA | 002/2009 | IPCA | RBL | CC 002/2009 | 12/8/2010 | 1/28/2039 | R$495,150.39 | 6/1/2025 | Ativa | T2009-196 | Contrato de Concessão nº 002/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | MIRANDA II | MC 230 kV TR 500/230 kV MIRANDA II TR1 MA | RB | FT TR 500/230 kV MIRANDA II TR1 MA | 002/2009 | IPCA | RBNI | REA 2533/2010 | 11/16/2015 | 2/10/2048 | R$172,065.11 | 6/1/2025 | Ativa | T2010-015 | SE Miranda II- Adequação de módulo de conexão, em 230 kV, do transformador TR1 500/230 kV, pela instalação de uma chave seccionadora para adequação de arranjo para barra dupla a quatro chaves. *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | ||
| AXIA Energia Norte | MIRANDA II | MC 230 kV TR 500/230 kV MIRANDA II TR1 MA | RB | FT TR 500/230 kV MIRANDA II TR1 MA | 002/2009 | IPCA | RBNI | REA 6219/2017 | 4/1/2019 | 6/14/2049 | R$65,114.30 | 6/1/2025 | Ativa | T2016-096 | Instalação de TP no módulo de conexão de transformador em 230 kV, associado ao banco de autotransformadores AT1 500/230/13,8 kV, 3x150 MVA para paralelismo com oAT2. *(Receita revisada em 27/06/2024) | ||
| AXIA Energia Norte | MIRANDA II | MC 230 kV TR 230/69 kV MIRANDA II TR3 MA | RBF | FT TR 230/69 kV MIRANDA II TR3 MA | 058/2001 | IPCA | RBNI | REA 9901/2021 | 1/8/2024 | 1/7/2051 | R$ 1,193,900.29 | 6/1/2025 | Ativa | T2020-022 | Instalar, na SE MIRANDA II, um módulo de conexão, em 230 kV, para o transformador trifásico TR3 230/69 kV - 100 MVA, arranjo Barra Dupla a Quatro Chaves. | ||
| AXIA Energia Norte | MIRANDA II | MC 230 kV TR 230/69 kV MIRANDA II TF2 MA | RBF | FT TR 230/69 kV MIRANDA II TF2 MA | 058/2001 | IPCA | RBNI | REA 2533/2010 | 11/16/2015 | 9/30/2044 | R$167,622.95 | 6/1/2025 | Ativa | T2010-015 | SE Miranda II- Adequação de módulo de conexão, em 230 kV, do transformador TF2 230/69 kV, pela instalação de duas chaves seccionadoras para alteração do tipo de arranjo para barra dupla a 4 chaves. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRANDA II | MC 230 kV TR 230/69 kV MIRANDA II TF2 MA | RBF | FT TR 230/69 kV MIRANDA II TF2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$183,181.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | MC 230 kV TR 230/69 kV MIRANDA II TF2 MA | RBF | FT TR 230/69 kV MIRANDA II TF2 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$397,673.32 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | MC 230 kV TR 230/69 kV MIRANDA II TF2 MA | RBF | FT TR 230/69 kV MIRANDA II TF2 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$381,407.29 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | MC 230 kV TR 230/69 kV MIRANDA II TF2 MA | RBF | FT TR 230/69 kV MIRANDA II TF2 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 12/30/2020 | 1/2/2051 | R$49,140.10 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MIRANDA II | MC 230 kV TR 230/69 kV MIRANDA II TF1 MA | RBF | FT TR 230/69 kV MIRANDA II TF1 MA | 058/2001 | IPCA | RBNI | REA 2533/2010 | 11/16/2015 | 9/1/2044 | R$167,617.74 | 6/1/2025 | Ativa | T2010-015 | SE Miranda II- Adequação de módulo de conexão, em 230 kV, do transformador TF1 230/69 kV, pela instalação de duas chaves seccionadoras para alteração de arranjo para barra dupla a quatro chaves. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRANDA II | MC 230 kV TR 230/69 kV MIRANDA II TF1 MA | RBF | FT TR 230/69 kV MIRANDA II TF1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$183,181.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | MC 230 kV TR 230/69 kV MIRANDA II TF1 MA | RBF | FT TR 230/69 kV MIRANDA II TF1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$397,673.32 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | MC 230 kV TR 230/69 kV MIRANDA II TF1 MA | RBF | FT TR 230/69 kV MIRANDA II TF1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$381,407.29 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | MC 230 kV TR 230/138 kV MIRANDA II TR3 MA | RBF | FT TR 230/138 kV MIRANDA II TR3 MA | 058/2001 | IPCA | RBNI | REA 2533/2010 | 11/16/2015 | 11/18/2046 | R$121,963.84 | 6/1/2025 | Ativa | T2010-015 | SE Miranda II - Adequação do módulo de conexão, em 230 kV do transformador AT3 230/138-13,8 kV, 100 MVA, pela instalação de uma chave seccionadora. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRANDA II | MC 230 kV TR 230/138 kV MIRANDA II TR3 MA | RBF | FT TR 230/138 kV MIRANDA II TR3 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$183,181.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | MC 230 kV TR 230/138 kV MIRANDA II TR2 MA | RBF | FT TR 230/138 kV MIRANDA II TR2 MA | 058/2001 | IPCA | RBNI | REA 2533/2010 | 11/16/2015 | 10/22/2044 | R$167,626.72 | 6/1/2025 | Ativa | T2010-015 | SE Miranda II- Adequação de módulo de conexão, em 230 kV, do transformador AT2 230/138 kV, pela instalação de duas chaves seccionadoras para alteração de arranjo para barra dupla a quatro chaves. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRANDA II | MC 230 kV TR 230/138 kV MIRANDA II TR2 MA | RBF | FT TR 230/138 kV MIRANDA II TR2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$183,181.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | MC 230 kV TR 230/138 kV MIRANDA II TR1 MA | RBF | FT TR 230/138 kV MIRANDA II TR1 MA | 058/2001 | IPCA | RBNI | REA 2533/2010 | 11/16/2015 | 3/29/2044 | R$167,589.18 | 6/1/2025 | Ativa | T2010-015 | SE Miranda II- Adequação de módulo de conexão, em 230 kV, do transformador AT1 230/138 kV, pela instalação de duas chaves seccionadoras para alteração de arranjo para barra dupla a quatro chaves. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRANDA II | MC 230 kV TR 230/138 kV MIRANDA II TR1 MA | RBF | FT TR 230/138 kV MIRANDA II TR1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$183,181.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | MC 230 kV RTB 230 kV 10 Mvar MIRANDA II RT2 MA | RB | FT RTB 230 kV 10 MVAr MIRANDA II RT2 MA | 058/2001 | IPCA | RBNI | REA 2533/2010 | 11/16/2015 | 12/28/2044 | R$296,788.97 | 6/1/2025 | Ativa | T2010-015 | SE Miranda II - Adequação do módulo de conexão, em 230 kV, do reator de barra RT2 230 kV de 10 Mvar, pela instalação de quatro chaves seccionadoras. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRANDA II | MC 230 kV RTB 230 kV 10 Mvar MIRANDA II RT2 MA | RB | FT RTB 230 kV 10 MVAr MIRANDA II RT2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$149,465.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | MC 230 kV RTB 230 kV 10 Mvar MIRANDA II RT2 MA | RB | FT RTB 230 kV 10 MVAr MIRANDA II RT2 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 6/22/2021 | 6/25/2051 | R$49,803.56 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MIRANDA II | MC 230 kV RTB 230 kV 10 Mvar MIRANDA II RT1 MA | RB | FT RTB 230 kV 10 MVAr MIRANDA II RT1 MA | 058/2001 | IPCA | RBNI | REA 2533/2010 | 11/16/2015 | 10/14/2044 | R$296,765.40 | 6/1/2025 | Ativa | T2010-015 | SE Miranda II - Adequação do módulo de conexão, em 230 kV, do reator de barra RT1 230 kV de 10 Mvar, pela instalação de quatro chaves seccionadoras. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRANDA II | MC 230 kV RTB 230 kV 10 Mvar MIRANDA II RT1 MA | RB | FT RTB 230 kV 10 MVAr MIRANDA II RT1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$149,465.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | MC 230 kV BC 230 kV 20 Mvar MIRANDA II BC2 MA | RB | FT BC 230 kV 20 Mvar MIRANDA II BC2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$191,096.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | MC 230 kV BC 230 kV 20 Mvar MIRANDA II BC2 MA | RB | FT BC 230 kV 20 Mvar MIRANDA II BC2 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 12/1/2020 | 12/4/2050 | R$9,487.39 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MIRANDA II | MC 230 kV BC 230 kV 20 Mvar MIRANDA II BC1 MA | RB | FT BC 230 kV 20 Mvar MIRANDA II BC1 MA | 058/2001 | IPCA | RBNI | REA 2533/2010 | 11/16/2015 | 6/2/2046 | R$237,445.32 | 6/1/2025 | Ativa | T2010-015 | SE Miranda II- Adequação de módulo de conexão, em 230 kV, de Capacitor em Derivação, em 230 kV, pela instalação de duas chaves seccionadoras para alteração de arranjo para barra dupla a quatro chaves. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRANDA II | MC 230 kV BC 230 kV 20 Mvar MIRANDA II BC1 MA | RB | FT BC 230 kV 20 Mvar MIRANDA II BC1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$191,096.68 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | MC 138 kV TR 230/138 kV MIRANDA II TR3 MA | RBF | FT TR 230/138 kV MIRANDA II TR3 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,943.07 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | MC 138 kV TR 230/138 kV MIRANDA II TR2 MA | RBF | FT TR 230/138 kV MIRANDA II TR2 MA | 058/2001 | IPCA | RBNI | REA 2533/2010 | 11/16/2015 | 11/15/2043 | R$92,182.97 | 6/1/2025 | Ativa | T2010-015 | SE Miranda II- Adequação de módulo de conexão, em 138 kV, do transformador AT2 230/138 kV, pela substituição do sistema de proteção e controle. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRANDA II | MC 138 kV TR 230/138 kV MIRANDA II TR2 MA | RBF | FT TR 230/138 kV MIRANDA II TR2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,943.07 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | MC 138 kV TR 230/138 kV MIRANDA II TR1 MA | RBF | FT TR 230/138 kV MIRANDA II TR1 MA | 058/2001 | IPCA | RBNI | REA 2533/2010 | 11/16/2015 | 11/15/2043 | R$92,182.97 | 6/1/2025 | Ativa | T2010-015 | SE Miranda II- Adequação de módulo de conexão, em 138 kV, do transformador AT1 230/138 kV, pela substituição do sistema de proteção e controle. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRANDA II | MC 138 kV TR 230/138 kV MIRANDA II TR1 MA | RBF | FT TR 230/138 kV MIRANDA II TR1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,943.07 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | MC 138 kV TR 230/138 kV MIRANDA II TR1 MA | RBF | FT TR 230/138 kV MIRANDA II TR1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$290,780.19 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | IB 69 kV MG 230 kV MIRANDA II MG1 MA IB1 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$50,221.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MIRANDA II | IB 69 kV MG 230 kV MIRANDA II MG1 MA IB1 | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$109,027.78 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MIRANDA II | IB 69 kV MG 230 kV MIRANDA II MG1 MA IB1 | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$104,568.22 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MIRANDA II | IB 500 kV MG 500 kV MIRANDA II MG1 MA IB3 | RB | FT MG 500 kV MIRANDA II MG1 MA | 002/2009 | IPCA | RBL | CC 002/2009 | 12/8/2010 | 1/28/2039 | R$455,256.62 | 6/1/2025 | Ativa | T2009-196 | Contrato de Concessão nº 002/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | MIRANDA II | IB 500 kV MG 500 kV MIRANDA II MG1 MA IB2 | RB | FT MG 500 kV MIRANDA II MG1 MA | 002/2009 | IPCA | RBL | CC 002/2009 | 12/8/2010 | 1/28/2039 | R$455,256.62 | 6/1/2025 | Ativa | T2009-196 | Contrato de Concessão nº 002/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | MIRANDA II | IB 500 kV MG 500 kV MIRANDA II MG1 MA IB1 | RB | FT MG 500 kV MIRANDA II MG1 MA | 002/2009 | IPCA | RBL | CC 002/2009 | 12/8/2010 | 1/28/2039 | R$455,256.62 | 6/1/2025 | Ativa | T2009-196 | Contrato de Concessão nº 002/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Norte | MIRANDA II | IB 230 kV MG 230 kV MIRANDA II MG1 MA IB1 | RB | FT MG 230 kV MIRANDA II MG1 MA | 058/2001 | IPCA | RBNI | REA 2533/2010 | 11/16/2015 | 1/24/2045 | R$231,965.11 | 6/1/2025 | Ativa | T2010-015 | SE Miranda II- Adequação de módulo de interligação de barramento, em 230 kV, pela instalação de duas chaves seccionadoras e três transformadores de corrente para alteração de arranjo para barra dupla a quatro chaves. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRANDA II | IB 230 kV MG 230 kV MIRANDA II MG1 MA IB1 | RB | FT MG 230 kV MIRANDA II MG1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$158,618.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | IB 230 kV MG 230 kV MIRANDA II MG1 MA IB1 | RB | FT MG 230 kV MIRANDA II MG1 MA | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$344,349.40 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | IB 138 kV MG 230 kV MIRANDA II MG1 MA IB1 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$103,483.77 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MIRANDA II | EL 69 kV MIRANDA II DIST3 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$87,355.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MIRANDA II | EL 69 kV MIRANDA II DIST3 | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$189,642.61 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MIRANDA II | EL 69 kV MIRANDA II DIST3 | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$181,885.66 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MIRANDA II | EL 69 kV MIRANDA II DIST2 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$87,355.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MIRANDA II | EL 69 kV MIRANDA II DIST2 | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$189,642.61 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MIRANDA II | EL 69 kV MIRANDA II DIST2 | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$181,885.66 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MIRANDA II | EL 69 kV MIRANDA II DIST1 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$87,355.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MIRANDA II | EL 69 kV MIRANDA II DIST1 | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$189,642.61 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MIRANDA II | EL 69 kV MIRANDA II DIST1 | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$181,885.66 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MIRANDA II | EL 500 kV MIRANDA II LT 500 kV MIRANDA II /SANTO A. DOS LOPES C-1 MA | RB | FT LT 500 kV MIRANDA II /SANTO A. DOS LOPES C-1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$559,746.88 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | EL 500 kV MIRANDA II LT 500 kV MIRANDA II /SANTO A. DOS LOPES C-1 MA | RB | FT LT 500 kV MIRANDA II /SANTO A. DOS LOPES C-1 MA | 058/2001 | IPCA | RBNI | DSP 622/2025 | 6/21/2024 | 6/20/2052 | R$252,682.62 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV,arranjo Disjuntor e Meio, na subestação Miranda II, associada à Linha de Transmissão 500 kVSanto Antônio dos Lopes - Miranda II C1. | |||
| AXIA Energia Norte | MIRANDA II | EL 500 kV MIRANDA II LT 500 kV MIRANDA II /P.DUTRA C-2 MA | RB | FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$559,746.88 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | EL 500 kV MIRANDA II LT 500 kV MIRANDA II /P.DUTRA C-2 MA | RB | FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA | 058/2001 | IPCA | RBNI | DSP 622/2025 | 6/21/2024 | 6/20/2052 | R$252,682.62 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV,arranjo Disjuntor e Meio, na subestação Miranda II, associada à Linha de Transmissão 500 kVPresidente Dutra - Miranda II C2. | |||
| AXIA Energia Norte | MIRANDA II | EL 500 kV MIRANDA II LT 500 kV BACABEIRA /MIRANDA II C-2 MA | RB | FT LT 500 kV BACABEIRA /MIRANDA II C-2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$559,746.88 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | EL 500 kV MIRANDA II LT 500 kV BACABEIRA /MIRANDA II C-2 MA | RB | FT LT 500 kV BACABEIRA /MIRANDA II C-2 MA | 058/2001 | IPCA | RBNI | DSP 622/2025 | 6/21/2024 | 6/20/2052 | R$252,682.62 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV,arranjo Disjuntor e Meio, na subestação Miranda II, associada à Linha de Transmissão 500 kV Bacabeira - Miranda II C2. | |||
| AXIA Energia Norte | MIRANDA II | EL 500 kV MIRANDA II LT 500 kV BACABEIRA /MIRANDA II C-1 MA | RB | FT LT 500 kV BACABEIRA /MIRANDA II C-1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$559,746.88 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | EL 500 kV MIRANDA II LT 500 kV BACABEIRA /MIRANDA II C-1 MA | RB | FT LT 500 kV BACABEIRA /MIRANDA II C-1 MA | 058/2001 | IPCA | RBNI | DSP 622/2025 | 6/21/2024 | 6/20/2052 | R$252,682.62 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV,arranjo Disjuntor e Meio, na subestação Miranda II, associada à Linha de Transmissão 500 kV Bacabeira - Miranda II C1. | |||
| AXIA Energia Norte | MIRANDA II | EL 230 kV MIRANDA II LT 230 kV SAO LUIS II /MIRANDA II C-1 MA | RB | FT LT 230 kV SAO LUIS II /MIRANDA II C-1 MA | 058/2001 | IPCA | RBNI | REA 2533/2010 | 11/16/2015 | 9/11/2044 | R$305,918.76 | 6/1/2025 | Ativa | T2010-015 | SE Miranda II- Adequação da entrada da linha para São Luís II, em 230 kV, pela instalação de duas chaves seccionadoras para alteração de arranjo para barra dupla a quatro chaves. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRANDA II | EL 230 kV MIRANDA II LT 230 kV SAO LUIS II /MIRANDA II C-1 MA | RB | FT LT 230 kV SAO LUIS II /MIRANDA II C-1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$260,258.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | EL 230 kV MIRANDA II LT 230 kV SAO LUIS II /MIRANDA II C-1 MA | RB | FT LT 230 kV SAO LUIS II /MIRANDA II C-1 MA | 058/2001 | IPCA | RMEL | REN 905/2020 | 10/8/2017 | 4/21/2049 | R$87,032.60 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | MIRANDA II | EL 230 kV MIRANDA II LT 230 kV MIRANDA II /PERITORO C-1 MA | RB | FT LT 230 kV MIRANDA II /PERITORO C-1 MA | 058/2001 | IPCA | RBNI | REA 2533/2010 | 11/16/2015 | 9/12/2044 | R$305,919.25 | 6/1/2025 | Ativa | T2010-015 | SE Miranda II- Adequação da entrada da linha para Peritoró C1, em 230 kV, pela instalação de duas chaves seccionadoras para alteração de arranjo para barra dupla a quatro chaves. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | MIRANDA II | EL 230 kV MIRANDA II LT 230 kV MIRANDA II /PERITORO C-1 MA | RB | FT LT 230 kV MIRANDA II /PERITORO C-1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$260,258.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | EL 138 kV MIRANDA II TRES MARIAS | DIT | 058/2001 | IPCA | RCDM | REN 443/2011 | 6/29/2017 | 6/28/2048 | R$811,019.34 | 6/1/2025 | Ativa | Entrada de linha em 138kV, destinada a conexão de linha na SE Três Marias * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Norte | MIRANDA II | EL 138 kV MIRANDA II SANTA INES C2 | DIT | 058/2001 | IPCA | RCDM | REN 443/2011 | 10/27/2017 | 9/2/2048 | R$ 1,111,985.34 | 6/1/2025 | Ativa | Instalação de Módulo de Entrada de Linha 138 kV arranjo BPT- SE Santa Inês C2 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Norte | MIRANDA II | EL 138 kV MIRANDA II SANTA INES C2 | DIT | 058/2001 | IPCA | RMEL | REN 905/2020 | 3/27/2018 | 1/11/2048 | R$313,955.11 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | MIRANDA II | EL 138 kV MIRANDA II DIST4 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$199,721.76 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MIRANDA II | EL 138 kV MIRANDA II DIST4 | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$433,580.72 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MIRANDA II | EL 138 kV MIRANDA II DIST4 | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$415,845.97 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MIRANDA II | EL 138 kV MIRANDA II DIST3 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$199,721.76 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MIRANDA II | EL 138 kV MIRANDA II DIST3 | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$433,580.72 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MIRANDA II | EL 13,8 kV MIRANDA II DIST6 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,540.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MIRANDA II | EL 13,8 kV MIRANDA II DIST6 | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$129,256.82 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MIRANDA II | EL 13,8 kV MIRANDA II DIST6 | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$123,969.83 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MIRANDA II | EL 13,8 kV MIRANDA II DIST5 | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$59,540.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MIRANDA II | EL 13,8 kV MIRANDA II DIST5 | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$129,256.82 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MIRANDA II | EL 13,8 kV MIRANDA II DIST5 | DIT | 058/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$123,969.83 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | MIRANDA II | BC 230 kV 20 Mvar MIRANDA II BC2 MA | RB | FT BC 230 kV 20 Mvar MIRANDA II BC2 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$138,561.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | MIRANDA II | BC 230 kV 20 Mvar MIRANDA II BC1 MA | RB | FT BC 230 kV 20 Mvar MIRANDA II BC1 MA | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$138,561.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | TT 69/13,8 kV MIRUEIRA TA2 PE | DIT | 061/2001 | IPCA | RCDM | REA 3578/2012 | 6/14/2016 | 2/10/2047 | R$184,673.59 | 6/1/2025 | Ativa | Obra de Substituição Completa - Substituição de transformador de aterramento 02A2. (Potência: 7,5 MVA) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | TT 69/13,8 kV MIRUEIRA TA1 PE | DIT | 061/2001 | IPCA | RCDM | REA 3578/2012 | 6/14/2016 | 2/10/2047 | R$184,673.59 | 6/1/2025 | Ativa | Obra de Substituição Completa - Substituição de transformador de aterramento 02A1. (Potência: 7,5 MVA) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | TR 69/13,8 kV MIRUEIRA TR5 PE | RB | FT MG 230 kV MIRUEIRA MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | TR 69/13,8 kV MIRUEIRA TR5 PE | RB | FT MG 230 kV MIRUEIRA MG1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$76,466.27 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | TR 69/13,8 kV MIRUEIRA TR5 PE | RB | FT MG 230 kV MIRUEIRA MG1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$70,492.55 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | TR 230/69 kV MIRUEIRA TR4 PE | RBF | FT TR 230/69 kV MIRUEIRA TR4 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | TR 230/69 kV MIRUEIRA TR4 PE | RBF | FT TR 230/69 kV MIRUEIRA TR4 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/25/2022 | 4/2/2057 | R$29,522.53 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | TR 230/69 kV MIRUEIRA TR4 PE | RBF | FT TR 230/69 kV MIRUEIRA TR4 PE | 061/2001 | IPCA | RBNIA | DSP 1168/2025 | R$ 3,045,818.21 | 6/1/2025 | Prevista | T2025-037 | Obra de Substituição Completa: Substituição do transformador 04TR4 100 MVA por 200 MVA | ||||
| AXIA Energia Nordeste | MIRUEIRA | TR 230/69 kV MIRUEIRA TR3 PE | RBF | FT TR 230/69 kV MIRUEIRA TR3 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | TR 230/69 kV MIRUEIRA TR3 PE | RBF | FT TR 230/69 kV MIRUEIRA TR3 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | TR 230/69 kV MIRUEIRA TR3 PE | RBF | FT TR 230/69 kV MIRUEIRA TR3 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/24/2021 | 5/1/2056 | R$32,103.14 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | TR 230/69 kV MIRUEIRA TR3 PE | RBF | FT TR 230/69 kV MIRUEIRA TR3 PE | 061/2001 | IPCA | RBNIA | DSP 1168/2025 | R$ 3,045,818.21 | 6/1/2025 | Prevista | T2025-036 | Obra de Substituição Completa: Substituição do transformador 04TR3 100 MVA por 200 MVA | ||||
| AXIA Energia Nordeste | MIRUEIRA | TR 230/69 kV MIRUEIRA TR2 PE | RBF | FT TR 230/69 kV MIRUEIRA TR2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | TR 230/69 kV MIRUEIRA TR2 PE | RBF | FT TR 230/69 kV MIRUEIRA TR2 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | TR 230/69 kV MIRUEIRA TR1 PE | RBF | FT TR 230/69 kV MIRUEIRA TR1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | TR 230/69 kV MIRUEIRA TR1 PE | RBF | FT TR 230/69 kV MIRUEIRA TR1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | MG 230 kV MIRUEIRA MG1 PE | RB | FT MG 230 kV MIRUEIRA MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$636,055.51 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | MG 230 kV MIRUEIRA MG1 PE | RB | FT MG 230 kV MIRUEIRA MG1 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/30/2014 | 7/29/2042 | R$60,420.82 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SISTEMAS AUTOMÁTICOS DE REGULAÇÃO ASSOCIADOS A TRANSFORMADORES Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | MG 230 kV MIRUEIRA MG1 PE | RB | FT MG 230 kV MIRUEIRA MG1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,784,879.23 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | MG 230 kV MIRUEIRA MG1 PE | RB | FT MG 230 kV MIRUEIRA MG1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,645,440.57 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | MG 230 kV MIRUEIRA MG1 PE | RB | FT MG 230 kV MIRUEIRA MG1 PE | 061/2001 | IPCA | RMEL | REN 443/2011 | 8/30/2016 | 8/29/2033 | R$7,609.40 | 6/1/2025 | Ativa | Implantação de Banco de Baterias * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | MG 230 kV MIRUEIRA MG1 PE | RB | FT MG 230 kV MIRUEIRA MG1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/24/2019 | 8/14/2036 | R$289,062.97 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | MC 69 kV TT 69/13,8 kV MIRUEIRA TA2 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MIRUEIRA | MC 69 kV TT 69/13,8 kV MIRUEIRA TA1 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MIRUEIRA | MC 69 kV TR 69/13,8 kV MIRUEIRA TR5 PE | RB | FT MG 230 kV MIRUEIRA MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$56,157.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | MC 69 kV TR 69/13,8 kV MIRUEIRA TR5 PE | RB | FT MG 230 kV MIRUEIRA MG1 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/18/2013 | 12/17/2046 | R$32,800.67 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DO DISJUNTOR FABRICADO POR SIEMENS MODELO 3AR1 12T5 69 KV. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | MC 69 kV TR 69/13,8 kV MIRUEIRA TR5 PE | RB | FT MG 230 kV MIRUEIRA MG1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$157,587.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | MC 69 kV TR 230/69 kV MIRUEIRA TR4 PE | RBF | FT TR 230/69 kV MIRUEIRA TR4 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | MC 69 kV TR 230/69 kV MIRUEIRA TR4 PE | RBF | FT TR 230/69 kV MIRUEIRA TR4 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | MC 69 kV TR 230/69 kV MIRUEIRA TR4 PE | RBF | FT TR 230/69 kV MIRUEIRA TR4 PE | 061/2001 | IPCA | RMEL | REN 443/2011 | 4/4/2016 | 4/19/2044 | R$1,976.18 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | MC 69 kV TR 230/69 kV MIRUEIRA TR4 PE | RBF | FT TR 230/69 kV MIRUEIRA TR4 PE | 061/2001 | IPCA | RBNIA | DSP 1168/2025 | R$532,542.86 | 6/1/2025 | Prevista | T2025-037 | Obra de Substituição Completa: Substituição da CT (Conexão de Transformador) 69 kV, Arranjo BPT | ||||
| AXIA Energia Nordeste | MIRUEIRA | MC 69 kV TR 230/69 kV MIRUEIRA TR3 PE | RBF | FT TR 230/69 kV MIRUEIRA TR3 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | MC 69 kV TR 230/69 kV MIRUEIRA TR3 PE | RBF | FT TR 230/69 kV MIRUEIRA TR3 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/17/2021 | 2/20/2051 | R$33,355.47 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | MC 69 kV TR 230/69 kV MIRUEIRA TR3 PE | RBF | FT TR 230/69 kV MIRUEIRA TR3 PE | 061/2001 | IPCA | RBNIA | DSP 1168/2025 | R$532,542.86 | 6/1/2025 | Prevista | T2025-036 | Obra de Substituição Completa: Substituição da CT (Conexão de Transformador) 69 kV, Arranjo BPT | ||||
| AXIA Energia Nordeste | MIRUEIRA | MC 69 kV TR 230/69 kV MIRUEIRA TR2 PE | RBF | FT TR 230/69 kV MIRUEIRA TR2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | MC 69 kV TR 230/69 kV MIRUEIRA TR2 PE | RBF | FT TR 230/69 kV MIRUEIRA TR2 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/9/2015 | 11/24/2043 | R$2,030.74 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32T2-6.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | MC 69 kV TR 230/69 kV MIRUEIRA TR2 PE | RBF | FT TR 230/69 kV MIRUEIRA TR2 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/10/2015 | 11/25/2043 | R$3,809.22 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32T2-4/5.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | MC 69 kV TR 230/69 kV MIRUEIRA TR2 PE | RBF | FT TR 230/69 kV MIRUEIRA TR2 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/21/2022 | 6/2/2055 | R$126,479.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | MC 69 kV TR 230/69 kV MIRUEIRA TR1 PE | RBF | FT TR 230/69 kV MIRUEIRA TR1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | MC 69 kV TR 230/69 kV MIRUEIRA TR1 PE | RBF | FT TR 230/69 kV MIRUEIRA TR1 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/9/2015 | 11/24/2043 | R$4,061.50 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32T1-5/6.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | MC 69 kV TR 230/69 kV MIRUEIRA TR1 PE | RBF | FT TR 230/69 kV MIRUEIRA TR1 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 3/9/2014 | 7/16/2045 | R$30,128.15 | 6/1/2025 | Ativa | Revitalização Necessária: SUBSTITUIÇÃO DOS TC BROWN BOVERI 92T1 FASE (A,B e C) e 92T2 FASE (A,B e C). Incluído no recurso contra a REH 2.098/2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC2 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MIRUEIRA | MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC2 PE | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/9/2015 | 11/24/2043 | R$2,030.74 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32H2-4.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC2 PE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MIRUEIRA | MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC2 PE | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/5/2018 | 10/7/2048 | R$31,116.53 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC1 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MIRUEIRA | MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC1 PE | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MIRUEIRA | MC 230 kV TR 230/69 kV MIRUEIRA TR4 PE | RBF | FT TR 230/69 kV MIRUEIRA TR4 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | MC 230 kV TR 230/69 kV MIRUEIRA TR4 PE | RBF | FT TR 230/69 kV MIRUEIRA TR4 PE | 061/2001 | IPCA | RMEL | REN 443/2011 | 4/24/2016 | 4/27/2046 | R$14,337.58 | 6/1/2025 | Ativa | Substituído TC QDR 245 com alta taxa de falha. Posição Operacional: 94T4-C/MRR. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | MC 230 kV TR 230/69 kV MIRUEIRA TR4 PE | RBF | FT TR 230/69 kV MIRUEIRA TR4 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/12/2022 | 12/27/2053 | R$200,563.83 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | MC 230 kV TR 230/69 kV MIRUEIRA TR4 PE | RBF | FT TR 230/69 kV MIRUEIRA TR4 PE | 061/2001 | IPCA | RBNIA | DSP 1168/2025 | R$ 1,420,106.92 | 6/1/2025 | Prevista | T2025-037 | Obra de Substituição Completa: Substituição da CT (Conexão de Transformador) 230 kV, Arranjo BPT | ||||
| AXIA Energia Nordeste | MIRUEIRA | MC 230 kV TR 230/69 kV MIRUEIRA TR3 PE | RBF | FT TR 230/69 kV MIRUEIRA TR3 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | MC 230 kV TR 230/69 kV MIRUEIRA TR3 PE | RBF | FT TR 230/69 kV MIRUEIRA TR3 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/10/2015 | 11/25/2043 | R$3,809.22 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32T3-4/5.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | MC 230 kV TR 230/69 kV MIRUEIRA TR3 PE | RBF | FT TR 230/69 kV MIRUEIRA TR3 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/21/2022 | 3/12/2055 | R$159,054.82 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | MC 230 kV TR 230/69 kV MIRUEIRA TR3 PE | RBF | FT TR 230/69 kV MIRUEIRA TR3 PE | 061/2001 | IPCA | RBNIA | DSP 1168/2025 | R$ 1,420,106.92 | 6/1/2025 | Prevista | T2025-036 | Obra de Substituição Completa: Substituição da CT (Conexão de Transformador) 230 kV, Arranjo BPT | ||||
| AXIA Energia Nordeste | MIRUEIRA | MC 230 kV TR 230/69 kV MIRUEIRA TR2 PE | RBF | FT TR 230/69 kV MIRUEIRA TR2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | MC 230 kV TR 230/69 kV MIRUEIRA TR2 PE | RBF | FT TR 230/69 kV MIRUEIRA TR2 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/16/2022 | 4/17/2054 | R$252,038.69 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | MC 230 kV TR 230/69 kV MIRUEIRA TR1 PE | RBF | FT TR 230/69 kV MIRUEIRA TR1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | MC 230 kV TR 230/69 kV MIRUEIRA TR1 PE | RBF | FT TR 230/69 kV MIRUEIRA TR1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/8/2022 | 6/12/2054 | R$247,241.13 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | IB 69 kV MG 230 kV MIRUEIRA MG1 PE IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MIRUEIRA | IB 69 kV MG 230 kV MIRUEIRA MG1 PE IB1 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 6/19/2015 | 7/4/2043 | R$3,877.72 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32D1-1/2.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | IB 69 kV MG 230 kV MIRUEIRA MG1 PE IB1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/8/2022 | 3/5/2055 | R$90,573.02 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | IB 230 kV MG 230 kV MIRUEIRA MG1 PE IB1 | RB | FT MG 230 kV MIRUEIRA MG1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,837.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | IB 230 kV MG 230 kV MIRUEIRA MG1 PE IB1 | RB | FT MG 230 kV MIRUEIRA MG1 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$325,059.40 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST9 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST9 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/9/2015 | 7/24/2043 | R$4,117.59 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32V1-6/7.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST9 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/24/2015 | 8/8/2043 | R$2,061.86 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32V1-5.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST9 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/5/2019 | 11/7/2047 | R$38,760.80 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST8 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST8 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/1/2015 | 7/16/2043 | R$4,114.35 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J9-6/7.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST8 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/10/2015 | 7/25/2043 | R$4,118.00 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J9-4/5.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST7 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST7 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/6/2015 | 7/8/2045 | R$3,835.08 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J8-4/5.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST7 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/8/2015 | 7/10/2045 | R$3,835.80 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J8-6/7.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST7 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/16/2022 | 11/15/2046 | R$5,492.61 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST6 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST6 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 6/29/2015 | 7/14/2043 | R$2,069.51 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J7-5.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST6 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/7/2015 | 7/22/2043 | R$4,116.78 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J7-6/7.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST5 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 6/23/2015 | 7/8/2043 | R$4,136.57 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J6-4/5.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST5 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/3/2015 | 7/18/2043 | R$4,115.16 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J6-6/7.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST5 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/19/2022 | 12/18/2046 | R$8,262.98 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST4 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 6/22/2015 | 7/7/2043 | R$4,136.17 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J5-4/5.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST4 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/13/2015 | 7/28/2043 | R$4,119.23 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J5-6/7.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST4 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/21/2022 | 12/20/2046 | R$8,264.92 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST3 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 6/17/2015 | 7/2/2043 | R$4,134.13 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J4-6/7.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST3 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 6/18/2015 | 7/3/2043 | R$4,134.53 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J4-4/5.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST3 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/15/2022 | 11/14/2046 | R$8,238.16 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST2 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 6/29/2015 | 7/14/2043 | R$2,069.51 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J3-5.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST2 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 6/30/2015 | 7/15/2043 | R$4,139.45 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J3-6/7.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/15/2022 | 11/14/2046 | R$8,238.16 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST1 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 6/26/2015 | 7/11/2043 | R$4,137.80 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J2-6/7.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST1 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/2/2015 | 7/17/2043 | R$4,114.75 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32J2-4/5.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIS13 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIS13 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIS13 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 4/18/2016 | 11/15/2043 | R$2,018.14 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIS12 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIS12 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/24/2015 | 2/19/2043 | R$6,305.56 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32V4-4/5/6.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIS12 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIS12 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/25/2022 | 3/24/2053 | R$63,077.34 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIS11 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIS11 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/28/2015 | 4/5/2043 | R$8,370.74 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32V3-4/5/6/7.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIS11 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/16/2022 | 12/15/2046 | R$8,260.79 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIS10 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIS10 | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/24/2015 | 8/8/2043 | R$8,247.39 | 6/1/2025 | Ativa | Revitalização Necessária: Instalação de contatos auxiliares de chaves seccionadoras, Tensão 69kV, Posição 32V2-4/5/6/7.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 69 kV MIRUEIRA DIS10 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/13/2018 | 7/15/2048 | R$30,899.28 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MIRUEIRA | EL 230 kV MIRUEIRA VAGO2 | RB | FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | EL 230 kV MIRUEIRA VAGO2 | RB | FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$596,907.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | EL 230 kV MIRUEIRA VAGO2 | RB | FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/16/2022 | 7/15/2046 | R$26,214.75 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | EL 230 kV MIRUEIRA VAGO1 | RB | FT LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | EL 230 kV MIRUEIRA VAGO1 | RB | FT LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE | 061/2001 | IPCA | RBNI | REA 2040/2009 | 7/7/2014 | 7/9/2044 | R$38,788.94 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 230 kV associadas ao disjuntor 14F3. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | EL 230 kV MIRUEIRA VAGO1 | RB | FT LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 2/2/2014 | 2/1/2042 | R$11,221.04 | 6/1/2025 | Ativa | Substituição do sistema de proteção da LT Mirueira-Pau Ferro 04F3 na SE Mirueira, por proteção digital (retrofit) Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-3 PE | RB | FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-3 PE | RB | FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 1/26/2014 | 1/25/2042 | R$34,008.05 | 6/1/2025 | Ativa | Substituição do sistema de proteção da LT Recife II-Mirueira 04C6 na SE Mirueira, por proteção digital (retrofit) Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-3 PE | RB | FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/28/2019 | 5/8/2044 | R$241,715.01 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-2 PE | RB | FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-2 PE | RB | FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 12/8/2013 | 12/7/2041 | R$33,833.34 | 6/1/2025 | Ativa | Substituição do sistema de proteção da LT Recife II-Mirueira 04C5 na SE Mirueira, por proteção digital (retrofit).Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-2 PE | RB | FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/16/2020 | 1/4/2049 | R$351,336.65 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-1 PE | RB | FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MIRUEIRA | EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-1 PE | RB | FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/10/2013 | 11/9/2041 | R$33,733.87 | 6/1/2025 | Ativa | Substituição do sistema de proteção da LT Recife II-Mirueira 04C4 na SE Mirueira, por proteção digital (retrofit).Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-1 PE | RB | FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/27/2020 | 7/4/2048 | R$318,454.12 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA | BC 69 kV 20,3 Mvar MIRUEIRA BC2 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$107,937.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MIRUEIRA | BC 69 kV 20,3 Mvar MIRUEIRA BC1 PE | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$107,937.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MIRUEIRA II | TT 69/0 kV MIRUEIRA II TT1 PE | DIT | 017/2012 | IPCA | RPEC | CC 017/2012 | 8/15/2016 | 6/1/2042 | R$72,946.88 | 6/1/2025 | Ativa | T2012-060-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | MIRUEIRA II | TR 230/69 kV MIRUEIRA II TR3 PE | RBF | FT TR 230/69 kV MIRUEIRA II TR3 PE | 017/2012 | IPCA | RBNIA | DSP 1168/2025 | R$ 2,064,157.69 | 6/1/2025 | Prevista | T2025-047 | Instalar, na SE MIRUEIRA II, de uma transformação trifásica TR3 230/69-13,8 KV - 150 MVA. | ||||
| AXIA Energia Nordeste | MIRUEIRA II | TR 230/69 kV MIRUEIRA II TR2 PE | RBF | FT TR 230/69 kV MIRUEIRA II TR2 PE | 017/2012 | IPCA | RBL | CC 017/2012 | 4/12/2016 | 6/1/2042 | R$ 1,845,566.16 | 6/1/2025 | Ativa | T2012-060-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MIRUEIRA II | TR 230/69 kV MIRUEIRA II TR1 PE | RBF | FT TR 230/69 kV MIRUEIRA II TR1 PE | 017/2012 | IPCA | RBL | CC 017/2012 | 4/12/2016 | 6/1/2042 | R$ 1,845,566.16 | 6/1/2025 | Ativa | T2012-060-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MIRUEIRA II | MG 230 kV MIRUEIRA II MG1 PE | RB | FT MG 230 kV MIRUEIRA II MG1 PE | 017/2012 | IPCA | RBL | CC 017/2012 | 4/12/2016 | 6/1/2042 | R$ 1,538,922.89 | 6/1/2025 | Ativa | T2012-060-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MIRUEIRA II | MG 230 kV MIRUEIRA II MG1 PE | RB | FT MG 230 kV MIRUEIRA II MG1 PE | 017/2012 | IPCA | RBNIA | DSP 1168/2025 | R$155,636.43 | 6/1/2025 | Prevista | T2025-047 | Modulo de Infraestrutura de Manobra em 230 kV na SE Mirueira II | ||||
| AXIA Energia Nordeste | MIRUEIRA II | MG 230 kV MIRUEIRA II MG1 PE | RB | FT MG 230 kV MIRUEIRA II MG1 PE | 017/2012 | IPCA | RBNIA | DSP 1168/2025 | R$44,816.98 | 6/1/2025 | Prevista | T2025-047 | Modulo de Infraestrutura de Manobra em 69 kV na SE Mirueira II | ||||
| AXIA Energia Nordeste | MIRUEIRA II | MC 69 kV TT 69/0 kV MIRUEIRA II TT1 PE | DIT | 017/2012 | IPCA | RPEC | CC 017/2012 | 8/15/2016 | 6/1/2042 | R$75,858.44 | 6/1/2025 | Ativa | T2012-060-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | MIRUEIRA II | MC 69 kV TR 230/69 kV MIRUEIRA II TR3 PE | RBF | FT TR 230/69 kV MIRUEIRA II TR3 PE | 017/2012 | IPCA | RBNIA | DSP 1168/2025 | R$463,037.23 | 6/1/2025 | Prevista | T2025-047 | Instalar, na SE MIRUEIRA II, um módulo de conexão, em 69 kV, para o transformador trifásico TR3 230/69 kV - 150 MVA, arranjo Barra Principal e Transferência. | ||||
| AXIA Energia Nordeste | MIRUEIRA II | MC 69 kV TR 230/69 kV MIRUEIRA II TR2 PE | RBF | FT TR 230/69 kV MIRUEIRA II TR2 PE | 017/2012 | IPCA | RBL | CC 017/2012 | 4/12/2016 | 6/1/2042 | R$561,859.79 | 6/1/2025 | Ativa | T2012-060-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MIRUEIRA II | MC 69 kV TR 230/69 kV MIRUEIRA II TR1 PE | RBF | FT TR 230/69 kV MIRUEIRA II TR1 PE | 017/2012 | IPCA | RBL | CC 017/2012 | 4/12/2016 | 6/1/2042 | R$561,859.79 | 6/1/2025 | Ativa | T2012-060-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MIRUEIRA II | MC 230 kV TR 230/69 kV MIRUEIRA II TR3 PE | RBF | FT TR 230/69 kV MIRUEIRA II TR3 PE | 017/2012 | IPCA | RBNIA | DSP 1168/2025 | R$ 1,291,148.17 | 6/1/2025 | Prevista | T2025-047 | Instalar, na SE MIRUEIRA II, um módulo de conexão, em 230 kV, para o transformador trifásico TR3 230/69 kV - 150 MVA, arranjo Barra Dupla a Quatro Chaves. | ||||
| AXIA Energia Nordeste | MIRUEIRA II | MC 230 kV TR 230/69 kV MIRUEIRA II TR2 PE | RBF | FT TR 230/69 kV MIRUEIRA II TR2 PE | 017/2012 | IPCA | RBL | CC 017/2012 | 4/12/2016 | 6/1/2042 | R$592,553.94 | 6/1/2025 | Ativa | T2012-060-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MIRUEIRA II | MC 230 kV TR 230/69 kV MIRUEIRA II TR1 PE | RBF | FT TR 230/69 kV MIRUEIRA II TR1 PE | 017/2012 | IPCA | RBL | CC 017/2012 | 4/12/2016 | 6/1/2042 | R$592,553.94 | 6/1/2025 | Ativa | T2012-060-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MIRUEIRA II | IB 69 kV MG 230 kV MIRUEIRA II MG1 PE IB1 | DIT | 017/2012 | IPCA | RPEC | CC 017/2012 | 8/15/2016 | 6/1/2042 | R$122,177.86 | 6/1/2025 | Ativa | T2012-060-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | MIRUEIRA II | IB 230 kV MG 230 kV MIRUEIRA II MG1 PE IB1 | RB | FT MG 230 kV MIRUEIRA II MG1 PE | 017/2012 | IPCA | RBL | CC 017/2012 | 4/12/2016 | 6/1/2042 | R$515,824.24 | 6/1/2025 | Ativa | T2012-060-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MIRUEIRA II | EL 69 kV MIRUEIRA II DIST4 | DIT | 017/2012 | IPCA | RPEC | CC 017/2012 | 8/15/2016 | 6/1/2042 | R$209,503.45 | 6/1/2025 | Ativa | T2012-060-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | MIRUEIRA II | EL 69 kV MIRUEIRA II DIST3 | DIT | 017/2012 | IPCA | RPEC | CC 017/2012 | 8/15/2016 | 6/1/2042 | R$209,503.45 | 6/1/2025 | Ativa | T2012-060-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | MIRUEIRA II | EL 69 kV MIRUEIRA II DIST2 | DIT | 017/2012 | IPCA | RPEC | CC 017/2012 | 8/15/2016 | 6/1/2042 | R$209,503.45 | 6/1/2025 | Ativa | T2012-060-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | MIRUEIRA II | EL 69 kV MIRUEIRA II DIST1 | DIT | 017/2012 | IPCA | RPEC | CC 017/2012 | 8/15/2016 | 6/1/2042 | R$209,503.45 | 6/1/2025 | Ativa | T2012-060-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | MIRUEIRA II | EL 230 kV MIRUEIRA II LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE | RB | FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE | 061/2001 | IPCA | RBNI | REA 10092/2021 | 3/11/2021 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Mirueira II, associada à linha de transmissão 230 kV Mirueira II – Pau Ferro C2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MIRUEIRA II | EL 230 kV MIRUEIRA II LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE | RB | FT LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE | 061/2001 | IPCA | RBNI | REA 10092/2021 | 2/23/2021 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Mirueira II, associada à linha de transmissão 230 kV Mirueira II – Pau Ferro C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | MISSOES | TR 230/69 kV MISSOES TR3 RS | RBF | FT TR 230/69 kV MISSOES TR3 RS | 005/2009 | IPCA | RBL | CC 005/2009 | 6/19/2010 | 1/28/2039 | R$540,364.20 | 6/1/2025 | Ativa | T2009-210 | Contrato de Concessão nº 005/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | MISSOES | TR 230/69 kV MISSOES TR2 RS | RBF | FT TR 230/69 kV MISSOES TR2 RS | 005/2009 | IPCA | RBL | CC 005/2009 | 6/19/2010 | 1/28/2039 | R$540,364.20 | 6/1/2025 | Ativa | T2009-210 | Contrato de Concessão nº 005/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | MISSOES | TR 230/69 kV MISSOES TR1 RS | RBF | FT TR 230/69 kV MISSOES TR1 RS | 005/2009 | IPCA | RBL | CC 005/2009 | 1/28/2009 | 1/28/2039 | R$820,245.73 | 6/1/2025 | Ativa | Ativos transferidos da RGE para a Eletrosul. *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Sul | MISSOES | MG 230 kV MISSOES MG1 RS | RB | FT MG 230 kV MISSOES MG1 RS | 005/2009 | IPCA | RBL | CC 005/2009 | 6/19/2010 | 1/28/2039 | R$ 3,441,931.47 | 6/1/2025 | Ativa | T2009-210 | Contrato de Concessão nº 005/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | MISSOES | MG 230 kV MISSOES MG1 RS | RB | FT MG 230 kV MISSOES MG1 RS | 005/2009 | IPCA | RBL | CC 005/2009 | 1/28/2009 | 1/28/2039 | R$151,471.81 | 6/1/2025 | Ativa | Ativos transferidos da RGE para a Eletrosul. *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Sul | MISSOES | MG 230 kV MISSOES MG1 RS | RB | FT MG 230 kV MISSOES MG1 RS | 005/2009 | IPCA | RMEL | REN 643/2014 | 11/25/2015 | 11/23/2047 | R$ 504.70 | 6/1/2025 | Ativa | Substituição das flexitestes dos TFs 1, 2 e 3 e das barras * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Sul | MISSOES | MG 230 kV MISSOES MG1 RS | RB | FT MG 230 kV MISSOES MG1 RS | 005/2009 | IPCA | RMEL | REN 643/2014 | 11/25/2015 | 11/23/2047 | R$ 504.70 | 6/1/2025 | Ativa | Substituição das flexitestes dos TFs 1, 2 e 3 e das barras * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Sul | MISSOES | MG 230 kV MISSOES MG1 RS | RB | FT MG 230 kV MISSOES MG1 RS | 005/2009 | IPCA | RBNI | REA 5861/2016 | 5/10/2019 | 1/3/2036 | R$18,906.11 | 6/1/2025 | Ativa | Instalação de 2 carregadores de baterias de 48 Vcc * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Sul | MISSOES | MG 230 kV MISSOES MG1 RS | RB | FT MG 230 kV MISSOES MG1 RS | 005/2009 | IPCA | RBNI | REN 1020/2022 | 2/6/2023 | 5/28/2056 | R$21,462.88 | 6/1/2025 | Ativa | MIM ASSOCIADO: Implantação de 01 (uma) Entrada de Linha 69 kV na SE Missões * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2023 - 2024 *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Sul | MISSOES | MC 69 kV TR 230/69 kV MISSOES TR3 RS | RBF | FT TR 230/69 kV MISSOES TR3 RS | 005/2009 | IPCA | RBL | CC 005/2009 | 6/19/2010 | 1/28/2039 | R$99,962.33 | 6/1/2025 | Ativa | T2009-210 | Contrato de Concessão nº 005/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | MISSOES | MC 69 kV TR 230/69 kV MISSOES TR2 RS | RBF | FT TR 230/69 kV MISSOES TR2 RS | 005/2009 | IPCA | RBL | CC 005/2009 | 6/19/2010 | 1/28/2039 | R$99,962.33 | 6/1/2025 | Ativa | T2009-210 | Contrato de Concessão nº 005/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | MISSOES | MC 69 kV TR 230/69 kV MISSOES TR1 RS | RBF | FT TR 230/69 kV MISSOES TR1 RS | 005/2009 | IPCA | RBL | CC 005/2009 | 1/28/2009 | 1/28/2039 | R$98,817.29 | 6/1/2025 | Ativa | Ativos transferidos da RGE para a Eletrosul. *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Sul | MISSOES | MC 230 kV TR 230/69 kV MISSOES TR3 RS | RBF | FT TR 230/69 kV MISSOES TR3 RS | 005/2009 | IPCA | RBL | CC 005/2009 | 6/19/2010 | 1/28/2039 | R$546,956.73 | 6/1/2025 | Ativa | T2009-210 | Contrato de Concessão nº 005/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | MISSOES | MC 230 kV TR 230/69 kV MISSOES TR3 RS | RBF | FT TR 230/69 kV MISSOES TR3 RS | 005/2009 | IPCA | RMEL | REN 643/2014 | 11/25/2015 | 11/23/2047 | R$ 504.70 | 6/1/2025 | Ativa | Substituição das flexitestes dos TFs 1, 2 e 3 e das barras * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Sul | MISSOES | MC 230 kV TR 230/69 kV MISSOES TR2 RS | RBF | FT TR 230/69 kV MISSOES TR2 RS | 005/2009 | IPCA | RBL | CC 005/2009 | 6/19/2010 | 1/28/2039 | R$546,956.73 | 6/1/2025 | Ativa | T2009-210 | Contrato de Concessão nº 005/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | MISSOES | MC 230 kV TR 230/69 kV MISSOES TR2 RS | RBF | FT TR 230/69 kV MISSOES TR2 RS | 005/2009 | IPCA | RMEL | REN 643/2014 | 11/25/2015 | 11/23/2047 | R$ 504.70 | 6/1/2025 | Ativa | Substituição das flexitestes dos TFs 1, 2 e 3 e das barras * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Sul | MISSOES | MC 230 kV TR 230/69 kV MISSOES TR1 RS | RBF | FT TR 230/69 kV MISSOES TR1 RS | 005/2009 | IPCA | RBL | CC 005/2009 | 1/28/2009 | 1/28/2039 | R$248,051.57 | 6/1/2025 | Ativa | Ativos transferidos da RGE para a Eletrosul. *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Sul | MISSOES | MC 230 kV TR 230/69 kV MISSOES TR1 RS | RBF | FT TR 230/69 kV MISSOES TR1 RS | 005/2009 | IPCA | RMEL | REN 643/2014 | 11/25/2015 | 11/23/2047 | R$ 504.70 | 6/1/2025 | Ativa | Substituição das flexitestes dos TFs 1, 2 e 3 e das barras * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Sul | MISSOES | IB 69 kV MG 230 kV MISSOES MG1 RS IB1 | DIT | 005/2009 | IPCA | RPEC | CC 005/2009 | 6/19/2010 | 1/28/2039 | R$59,862.90 | 6/1/2025 | Ativa | T2009-210 | Contrato de Concessão nº 005/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia Sul | MISSOES | IB 230 kV MG 230 kV MISSOES MG1 RS IB1 | RB | FT MG 230 kV MISSOES MG1 RS | 005/2009 | IPCA | RBL | CC 005/2009 | 6/19/2010 | 1/28/2039 | R$302,437.23 | 6/1/2025 | Ativa | T2009-210 | Contrato de Concessão nº 005/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia Sul | MISSOES | EL 69 kV MISSOES DIST2 | DIT | 005/2009 | IPCA | RCDM | REN 1020/2022 | 2/6/2023 | 1/30/2048 | R$591,534.52 | 6/1/2025 | Ativa | Implantação de 01 (uma) Entrada de Linha 69 kV na SE Missões * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2023 - 2024 *(Receita revisada em 27/06/2024) | ||||
| AXIA Energia Sul | MISSOES | EL 69 kV MISSOES DIST1 | DIT | 005/2009 | IPCA | RPEC | CC 005/2009 | 6/19/2010 | 1/28/2039 | R$50,333.77 | 6/1/2025 | Ativa | T2009-210 | Contrato de Concessão nº 005/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | |||
| AXIA Energia | MOGI CRUZES | TT 13,8/0,12 kV MOGI CRUZES TR2 SP | RB | FT TR 345/230 kV MOGI CRUZES TR2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | TT 13,8/0,12 kV MOGI CRUZES TR1 SP | RB | FT TR 345/230 kV MOGI CRUZES TR1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$84,422.78 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | TR 345/230 kV MOGI CRUZES TRR1 SP | RB | FT TR 345/230 kV MOGI CRUZES TRR1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$414,948.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | TR 345/230 kV MOGI CRUZES TRR1 SP | RB | FT TR 345/230 kV MOGI CRUZES TRR1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,592,315.70 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | TR 345/230 kV MOGI CRUZES TRR1 SP | RB | FT TR 345/230 kV MOGI CRUZES TRR1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,707,047.67 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | TR 345/230 kV MOGI CRUZES TR2 SP | RB | FT TR 345/230 kV MOGI CRUZES TR2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,244,018.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | TR 345/230 kV MOGI CRUZES TR2 SP | RB | FT TR 345/230 kV MOGI CRUZES TR2 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,773,769.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | TR 345/230 kV MOGI CRUZES TR2 SP | RB | FT TR 345/230 kV MOGI CRUZES TR2 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 5,117,736.46 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | TR 345/230 kV MOGI CRUZES TR1 SP | RB | FT TR 345/230 kV MOGI CRUZES TR1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,244,018.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | TR 345/230 kV MOGI CRUZES TR1 SP | RB | FT TR 345/230 kV MOGI CRUZES TR1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 4,773,769.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | TR 345/230 kV MOGI CRUZES TR1 SP | RB | FT TR 345/230 kV MOGI CRUZES TR1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 5,117,736.46 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | MG 345 kV MOGI CRUZES MG1 SP | RB | FT MG 345 kV MOGI CRUZES MG1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$956,154.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | MG 345 kV MOGI CRUZES MG1 SP | RB | FT MG 345 kV MOGI CRUZES MG1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,669,124.23 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | MG 345 kV MOGI CRUZES MG1 SP | RB | FT MG 345 kV MOGI CRUZES MG1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 3,933,497.59 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | MG 345 kV MOGI CRUZES MG1 SP | RB | FT MG 345 kV MOGI CRUZES MG1 SP | 062/2001 | IPCA | RBNI | REA 4347/2013 | 4/20/2017 | 10/12/2044 | R$110,659.57 | 6/1/2025 | Ativa | Troca da proteção existente no setor de 230 kV por uma proteção diferencial do tipo adaptativa. RAP incluída no recurso administrativo face a REH 2258/2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | MG 345 kV MOGI CRUZES MG1 SP | RB | FT MG 345 kV MOGI CRUZES MG1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 10/29/2019 | 3/15/2045 | R$614,786.18 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | MOGI CRUZES | MC 345 kV TR 345/230 kV MOGI CRUZES TR2 SP | RB | FT TR 345/230 kV MOGI CRUZES TR2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | MC 345 kV TR 345/230 kV MOGI CRUZES TR2 SP | RB | FT TR 345/230 kV MOGI CRUZES TR2 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,046,877.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | MC 345 kV TR 345/230 kV MOGI CRUZES TR1 SP | RB | FT TR 345/230 kV MOGI CRUZES TR1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$272,810.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | MC 345 kV TR 345/230 kV MOGI CRUZES TR1 SP | RB | FT TR 345/230 kV MOGI CRUZES TR1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,046,877.77 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | MC 230 kV TR 345/230 kV MOGI CRUZES TR2 SP | RB | FT TR 345/230 kV MOGI CRUZES TR2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$139,689.47 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | MC 230 kV TR 345/230 kV MOGI CRUZES TR2 SP | RB | FT TR 345/230 kV MOGI CRUZES TR2 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$536,041.20 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | MC 230 kV TR 345/230 kV MOGI CRUZES TR2 SP | RB | FT TR 345/230 kV MOGI CRUZES TR2 SP | 062/2001 | IPCA | RBNI | REA 4347/2013 | 4/20/2017 | 10/12/2046 | R$56,077.65 | 6/1/2025 | Ativa | Adequação do barramento de 230 kV do arranjo em barra principal e de transferência para barra dupla a 5 chaves do vão do AT02 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | MC 230 kV TR 345/230 kV MOGI CRUZES TR2 SP | RB | FT TR 345/230 kV MOGI CRUZES TR2 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/28/2016 | 10/7/2047 | R$246,824.55 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | MOGI CRUZES | MC 230 kV TR 345/230 kV MOGI CRUZES TR1 SP | RB | FT TR 345/230 kV MOGI CRUZES TR1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$139,689.47 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | MC 230 kV TR 345/230 kV MOGI CRUZES TR1 SP | RB | FT TR 345/230 kV MOGI CRUZES TR1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$536,041.20 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | MC 230 kV TR 345/230 kV MOGI CRUZES TR1 SP | RB | FT TR 345/230 kV MOGI CRUZES TR1 SP | 062/2001 | IPCA | RBNI | REA 4347/2013 | 4/20/2017 | 10/12/2046 | R$56,077.65 | 6/1/2025 | Ativa | Adequação do barramento de 230 kV do arranjo em barra principal e de transferência para barra dupla a 5 chaves do vão do AT01 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | MC 230 kV TR 345/230 kV MOGI CRUZES TR1 SP | RB | FT TR 345/230 kV MOGI CRUZES TR1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/10/2017 | 2/17/2049 | R$257,395.72 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | MOGI CRUZES | MC 13,8 kV TT 13,8/0,12 kV MOGI CRUZES TR2 SP | RB | FT TR 345/230 kV MOGI CRUZES TR2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | MC 13,8 kV TT 13,8/0,12 kV MOGI CRUZES TR1 SP | RB | FT TR 345/230 kV MOGI CRUZES TR1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$25,024.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | IB 345 kV MG 345 kV MOGI CRUZES MG1 SP IB1 | RB | FT MG 345 kV MOGI CRUZES MG1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | IB 345 kV MG 345 kV MOGI CRUZES MG1 SP IB1 | RB | FT MG 345 kV MOGI CRUZES MG1 SP | 062/2001 | IPCA | RBNI | REA 1814/2009 | 10/22/2012 | 12/17/2038 | R$319,621.34 | 6/1/2025 | Ativa | Substituição de 1 DJ, 2 CS e 6 TC no Vão de Amarre *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | IB 230 kV MG 345 kV MOGI CRUZES MG1 SP IB1 | RB | FT MG 345 kV MOGI CRUZES MG1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$110,555.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | IB 230 kV MG 345 kV MOGI CRUZES MG1 SP IB1 | RB | FT MG 345 kV MOGI CRUZES MG1 SP | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$424,243.69 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | IB 230 kV MG 345 kV MOGI CRUZES MG1 SP IB1 | RB | FT MG 345 kV MOGI CRUZES MG1 SP | 062/2001 | IPCA | RBNI | REA 4347/2013 | 4/20/2017 | 10/12/2046 | R$140,474.78 | 6/1/2025 | Ativa | Adequação do barramento de 230 kV do arranjo em barra principal e de transferência para barra dupla a 5 chaves do vão de Amarre. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | IB 230 kV MG 345 kV MOGI CRUZES MG1 SP IB1 | RB | FT MG 345 kV MOGI CRUZES MG1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 6/10/2017 | 6/9/2050 | R$151,678.56 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 345 kV MOGI CRUZES LT 345 kV MOGI CRUZES /NORDESTE C-1 SP | RB | FT LT 345 kV MOGI CRUZES /NORDESTE C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | EL 345 kV MOGI CRUZES LT 345 kV MOGI CRUZES /NORDESTE C-1 SP | RB | FT LT 345 kV MOGI CRUZES /NORDESTE C-1 SP | 062/2001 | IPCA | RBNI | REA 1814/2009 | 4/6/2015 | 4/24/2044 | R$332,741.39 | 6/1/2025 | Ativa | Substituição de 1 disjuntor e 5 chaves seccionadoras superados no vão Nordeste. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 345 kV MOGI CRUZES LT 345 kV MOGI CRUZES /NORDESTE C-1 SP | RB | FT LT 345 kV MOGI CRUZES /NORDESTE C-1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/22/2015 | 8/14/2036 | R$9,063.00 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARA-RAIOS LIMONE FASE A - Nº Oper: LIMONE 345 KV - PMI (008641/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 345 kV MOGI CRUZES LT 345 kV MOGI CRUZES /NORDESTE C-1 SP | RB | FT LT 345 kV MOGI CRUZES /NORDESTE C-1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/22/2015 | 8/14/2036 | R$9,063.00 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARA-RAIOS LIMONE FASE B - Nº Oper: LIMONE 345 KV - PMI (008642/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 345 kV MOGI CRUZES LT 345 kV MOGI CRUZES /NORDESTE C-1 SP | RB | FT LT 345 kV MOGI CRUZES /NORDESTE C-1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/22/2015 | 8/14/2036 | R$9,063.00 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARA-RAIOS LIMONE FASE C - Nº Oper: LIMONE 345 KV - PMI (008643/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-2 SP | RB | FT LT 345 kV ITAPETI /MOGI CRUZES C-2 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-2 SP | RB | FT LT 345 kV ITAPETI /MOGI CRUZES C-2 SP | 062/2001 | IPCA | RBNI | REA 1814/2009 | 4/6/2015 | 8/21/2045 | R$180,708.88 | 6/1/2025 | Ativa | Substituição de disjuntor superado no vão Itapeti 2. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-2 SP | RB | FT LT 345 kV ITAPETI /MOGI CRUZES C-2 SP | 062/2001 | IPCA | RBNI | REA 1814/2009 | 4/6/2015 | 9/28/2042 | R$152,005.12 | 6/1/2025 | Ativa | Substituição de seccionadoras 345 kV superadas no vão Itapeti 2. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-2 SP | RB | FT LT 345 kV ITAPETI /MOGI CRUZES C-2 SP | 062/2001 | IPCA | RBNI | REA 1814/2009 | 4/6/2015 | 9/28/2042 | R$65,133.32 | 6/1/2025 | Ativa | Substituição de TRANSFORMADOR DE CORRENTE VÃO ITAPETI 2 . Reforço de Pequeno Porte reconhecido no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-1 SP | RB | FT LT 345 kV ITAPETI /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-1 SP | RB | FT LT 345 kV ITAPETI /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RBNI | REA 1814/2009 | 2/16/2013 | 12/28/2039 | R$288,438.71 | 6/1/2025 | Ativa | Substituição de 1 DJ e 5 CS na EL Itapeti I *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-1 SP | RB | FT LT 345 kV ITAPETI /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/1/2015 | 6/24/2036 | R$9,036.04 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARA-RAIOS LIIDMO1 FASE A - Nº Oper: LIIDMO1 345 KV - PMI (008629/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-1 SP | RB | FT LT 345 kV ITAPETI /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/1/2015 | 6/24/2036 | R$9,036.04 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARA-RAIOS LIIDMO1 FASE B - Nº Oper: LIIDMO1 345 KV - PMI (008630/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-1 SP | RB | FT LT 345 kV ITAPETI /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 3/1/2015 | 6/24/2036 | R$9,036.04 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARA-RAIOS LIIDMO1 FASE C - Nº Oper: LIIDMO1 345 KV - PMI (008631/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 345 kV MOGI CRUZES LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP | RB | FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$320,528.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | EL 345 kV MOGI CRUZES LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP | RB | FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RBNI | REA 1814/2009 | 8/11/2012 | 10/20/2038 | R$327,350.34 | 6/1/2025 | Ativa | Substituição de 1 DJ e 5 CS na EL Poços de Caldas *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 345 kV MOGI CRUZES LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP | RB | FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 2/8/2015 | 6/3/2036 | R$9,010.76 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARA-RAIOS LIMOAB FASE A - Nº Oper: LIMOAB 345 KV - PMI (008638/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 345 kV MOGI CRUZES LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP | RB | FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 2/8/2015 | 6/3/2036 | R$9,010.76 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARA-RAIOS LIMOAB FASE B - Nº Oper: LIMOAB 345 KV - PMI (008639/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 345 kV MOGI CRUZES LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP | RB | FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RMEL | REN 443/2011 | 2/8/2015 | 6/3/2036 | R$9,010.76 | 6/1/2025 | Ativa | Substituição de PARA-RAIOS PARA-RAIOS LIMOAB FASE C - Nº Oper: LIMOAB 345 KV - PMI (008640/2016) * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 345 kV MOGI CRUZES LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP | RB | FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 2/10/2015 | 1/13/2047 | R$14,524.79 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 230 kV MOGI CRUZES LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-1 SP | RB | FT LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$203,013.49 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | EL 230 kV MOGI CRUZES LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-1 SP | RB | FT LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RBNI | REA 2040/2009 | 4/6/2015 | 9/28/2042 | R$33,196.33 | 6/1/2025 | Ativa | Substituir 3 chaves seccionadoras (incluindo lâmina de terra) e 1 filtro de onda, todos atualmente com capacidade nominal de 1200 A, no bay da LT para a SE São José dos Campos, C2. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 230 kV MOGI CRUZES LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-1 SP | RB | FT LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/6/2015 | 9/25/2052 | R$30,185.92 | 6/1/2025 | Ativa | Troca de barramento nas entradas do VLT e conexão aos equipamentos de manobra, com a substituição das conexões (pingadas) dos vãos das LI 230 kV Mogi (CTEEP) - Mogi (Furnas) e das LI 230 kV São José dos Campos - Mogi das Cruzes, circuitos 1 e 2. No cálculo da RAP foi considerada a data informada pela transmissora (06/10/2013). RAP Ativada no reajuste do ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 230 kV MOGI CRUZES LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-1 SP | RB | FT LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RBNI | REA 4347/2013 | 4/20/2017 | 10/12/2046 | R$105,032.71 | 6/1/2025 | Ativa | Adequação do barramento de 230 kV do arranjo em barra principal e de transferência para barra dupla a 5 chaves do vão da LT Mogi - S. Jose dos Campos. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 230 kV MOGI CRUZES LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-1 SP | RB | FT LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RBNI | REA 2837/2011 | 5/3/2017 | 5/2/2050 | R$110,954.21 | 6/1/2025 | Ativa | Substituição do 01 disjuntor e 03 TCs superadosdo vãono S.J.Campos c2 (7026) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 – 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 230 kV MOGI CRUZES LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-1 SP | RB | FT LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/12/2019 | 8/14/2050 | R$192,800.51 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 230 kV MOGI CRUZES LT 230 kV MOGI /MOGI CRUZES C-1 SP | RB | FT LT 230 kV MOGI /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$203,013.49 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | EL 230 kV MOGI CRUZES LT 230 kV MOGI /MOGI CRUZES C-1 SP | RB | FT LT 230 kV MOGI /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RBNI | REA 2837/2011 | 4/6/2015 | 9/28/2042 | R$100,167.50 | 6/1/2025 | Ativa | Substituição das chaves seccionadoras 7031, 7033, 7035 e 7030T da LT 230 kV Mogi Furnas-Mogi CTEEP. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 230 kV MOGI CRUZES LT 230 kV MOGI /MOGI CRUZES C-1 SP | RB | FT LT 230 kV MOGI /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/6/2015 | 9/25/2052 | R$30,185.92 | 6/1/2025 | Ativa | Troca de barramento nas entradas do VLT e conexão aos equipamentos de manobra, com a substituição das conexões (pingadas) dos vãos das LI 230 kV Mogi (CTEEP) - Mogi (Furnas) e das LI 230 kV São José dos Campos - Mogi das Cruzes, circuitos 1 e 2. No cálculo da RAP foi considerada a data informada pela transmissora (06/10/2013). RAP cadastrada como prevista em função da ausência de Termo de Liberação. CLASSIFICADA COMO ATIVA NO CICLO 16/17 CONFORME TL *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 230 kV MOGI CRUZES LT 230 kV MOGI /MOGI CRUZES C-1 SP | RB | FT LT 230 kV MOGI /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RBNI | REA 4347/2013 | 4/20/2017 | 10/12/2046 | R$26,031.41 | 6/1/2025 | Ativa | Adequação do barramento de 230 kV do arranjo em barra principal e de transferência para barra dupla a 5 chaves da LT Mogi (CTEEP) -Mogi (Furnas). * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 230 kV MOGI CRUZES LT 230 kV MOGI /MOGI CRUZES C-1 SP | RB | FT LT 230 kV MOGI /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 7/17/2016 | 4/24/2047 | R$248,808.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 230 kV MOGI CRUZES LT 230 kV ITAPETI /MOGI CRUZES C-1 SP | RB | FT LT 230 kV ITAPETI /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$203,013.49 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | MOGI CRUZES | EL 230 kV MOGI CRUZES LT 230 kV ITAPETI /MOGI CRUZES C-1 SP | RB | FT LT 230 kV ITAPETI /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RBNI | REA 2040/2009 | 4/6/2015 | 9/28/2042 | R$79,007.25 | 6/1/2025 | Ativa | Substituir 3 chaves seccionadoras (incluindo lâmina de terra) e 1 filtro de onda, todos atualmente com capacidade nominal de 1200 A, no bay da LT para a SE São José dos Campos - C1 (Atual LT 230 kV MOGI/ITAPETI). RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 230 kV MOGI CRUZES LT 230 kV ITAPETI /MOGI CRUZES C-1 SP | RB | FT LT 230 kV ITAPETI /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RBNI | REA 2837/2011 | 4/6/2015 | 10/22/2044 | R$114,434.66 | 6/1/2025 | Ativa | Substituição do disjuntor e de 3 TC superados no vão Itapeti (S.J.Campos C1)(7016). RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 230 kV MOGI CRUZES LT 230 kV ITAPETI /MOGI CRUZES C-1 SP | RB | FT LT 230 kV ITAPETI /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/6/2015 | 9/25/2052 | R$30,185.92 | 6/1/2025 | Ativa | Troca de barramento nas entradas do VLT e conexão aos equipamentos de manobra, com a substituição das conexões (pingadas) dos vãos das LI 230 kV Mogi (CTEEP) - Mogi (Furnas) e das LI 230 kV São José dos Campos - Mogi das Cruzes, circuitos 1 e 2. No cálculo da RAP foi considerada a data informada pela transmissora (06/10/2013). RAP cadastrada como prevista em função da ausência de Termo de Liberação. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 230 kV MOGI CRUZES LT 230 kV ITAPETI /MOGI CRUZES C-1 SP | RB | FT LT 230 kV ITAPETI /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RBNI | REA 4347/2013 | 4/20/2017 | 10/12/2046 | R$52,062.82 | 6/1/2025 | Ativa | Adequação do barramento de 230 kV do arranjo em barra principal e de transferência para barra dupla a 5 chaves do vão da LT Mogi - Itapeti. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | MOGI CRUZES | EL 230 kV MOGI CRUZES LT 230 kV ITAPETI /MOGI CRUZES C-1 SP | RB | FT LT 230 kV ITAPETI /MOGI CRUZES C-1 SP | 062/2001 | IPCA | RMEL | REN 905/2020 | 9/10/2014 | 6/7/2043 | R$119,249.60 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | MONTE CLARO | MG 230 kV MONTE CLARO MG1 RS | RB | FT MG 230 kV MONTE CLARO MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,172.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | MONTE CLARO | IB 230 kV MG 230 kV MONTE CLARO MG1 RS IB1 | RB | FT MG 230 kV MONTE CLARO MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$100,223.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | MONTE CLARO | IB 230 kV MG 230 kV MONTE CLARO MG1 RS IB1 | RB | FT MG 230 kV MONTE CLARO MG1 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 10/31/2022 | 10/30/2037 | R$42,498.84 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | MONTE CLARO | EL 230 kV MONTE CLARO LT 230 kV MONTE CLARO /VINHEDOS C-1 RS | RB | FT LT 230 kV MONTE CLARO /VINHEDOS C-1 RS | 012/2010 | IPCA | RBL | CC 012/2010 | 7/19/2013 | 10/6/2040 | R$863,208.15 | 6/1/2025 | Ativa | T2010-079 | Contrato de Concessão nº 012/2010 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. * Receita revisada no ciclo 2021-2022. | ||
| AXIA Energia Sul | MONTE CLARO | EL 230 kV MONTE CLARO LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS | RB | FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS | 057/2001 | IPCA | RBNI | REA 3161/2011 | 9/25/2015 | 9/24/2043 | R$25,170.80 | 6/1/2025 | Ativa | T2011-133 | Adequação do sistema de proteção e controle na entrada de linha em 230 kV na subestação Monte Claro, referente à linha de transmissão Monte Claro - Nova Prata 2. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | MONTE CLARO | EL 230 kV MONTE CLARO LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS | RB | FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | MONTE CLARO | EL 230 kV MONTE CLARO LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS | RB | FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 10/31/2022 | 10/30/2037 | R$3,691.79 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | MONTE CLARO | EL 230 kV MONTE CLARO LT 230 kV MONTE CLARO /NOVA PRATA 2 C-1 RS | RB | FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | MONTE CLARO | EL 230 kV MONTE CLARO LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS | RB | FT LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$188,929.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | MONTE CLARO | EL 230 kV MONTE CLARO LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS | RB | FT LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| Nova Era Ceará | MORADA NOVA | TR 500/230 kV MORADA NOVA TRR1 CE | RB | FT TR 500/230 kV MORADA NOVA TRR1 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 2,051,094.73 | 6/1/2025 | Prevista | T2024-195-B | - SE 500/230 kV Morada Nova - (6+1R) x 300 MVA. | ||||
| Nova Era Ceará | MORADA NOVA | TR 500/230 kV MORADA NOVA TR2 CE | RB | FT TR 500/230 kV MORADA NOVA TR2 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 6,153,284.20 | 6/1/2025 | Prevista | T2024-195-B | - SE 500/230 kV Morada Nova - (6+1R) x 300 MVA. | ||||
| Nova Era Ceará | MORADA NOVA | TR 500/230 kV MORADA NOVA TR1 CE | RB | FT TR 500/230 kV MORADA NOVA TR1 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 6,153,284.20 | 6/1/2025 | Prevista | T2024-195-B | - SE 500/230 kV Morada Nova - (6+1R) x 300 MVA. | ||||
| Nova Era Ceará | MORADA NOVA | RTB 500 kV 50 Mvar MORADA NOVA RTR1 CE | RB | FT RTB 500 kV 50 Mvar MORADA NOVA RTR1 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$641,075.50 | 6/1/2025 | Prevista | T2024-195-C | - Seccionamento da LT 500 kV Açu III – Quixadá – C1 na subestação Morada Nova;- Remanejamento de banco de reator de linha de 150Mvar da LT 500kV Açu III – Quixadá C1 da SE Quixadá para a barra da SE Morada Nova, incluindo a instalação do respectivo Módulo de Conexão de Reator de Barra;- Unidade de reator monofásico reserva de 50Mvar em 500kV associado ao reator de barra da SE Morada Nova que será remanejado da SE Quixadá | ||||
| Nova Era Ceará | MORADA NOVA | MG 500 kV MORADA NOVA MG1 CE | RB | FT MG 500 kV MORADA NOVA MG1 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 3,059,107.98 | 6/1/2025 | Prevista | T2024-195-B | - SE 500/230 kV Morada Nova - (6+1R) x 300 MVA. | ||||
| Nova Era Ceará | MORADA NOVA | MC 500 kV TR 500/230 kV MORADA NOVA TR2 CE | RB | FT TR 500/230 kV MORADA NOVA TR2 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 1,618,353.02 | 6/1/2025 | Prevista | T2024-195-B | - SE 500/230 kV Morada Nova - (6+1R) x 300 MVA. | ||||
| Nova Era Ceará | MORADA NOVA | MC 500 kV TR 500/230 kV MORADA NOVA TR1 CE | RB | FT TR 500/230 kV MORADA NOVA TR1 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 1,618,353.02 | 6/1/2025 | Prevista | T2024-195-B | - SE 500/230 kV Morada Nova - (6+1R) x 300 MVA. | ||||
| Nova Era Ceará | MORADA NOVA | MC 500 kV RTL 500 kV 150 Mvar QUIXADA RT3 CE | RB | FT LT 500 kV QUIXADA /ACU III C-1 CE/RN | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 1,311,397.89 | 6/1/2025 | Prevista | T2024-195-C | - Seccionamento da LT 500 kV Açu III – Quixadá – C1 na subestação Morada Nova;- Remanejamento de banco de reator de linha de 150Mvar da LT 500kV Açu III – Quixadá C1 da SE Quixadá para a barra da SE Morada Nova, incluindo a instalação do respectivo Módulo de Conexão de Reator de Barra;- Unidade de reator monofásico reserva de 50Mvar em 500kV associado ao reator de barra da SE Morada Nova que será remanejado da SE Quixadá | ||||
| Nova Era Ceará | MORADA NOVA | MC 230 kV TR 500/230 kV MORADA NOVA TR2 CE | RB | FT TR 500/230 kV MORADA NOVA TR2 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 1,037,826.74 | 6/1/2025 | Prevista | T2024-195-B | - SE 500/230 kV Morada Nova - (6+1R) x 300 MVA. | ||||
| Nova Era Ceará | MORADA NOVA | MC 230 kV TR 500/230 kV MORADA NOVA TR1 CE | RB | FT TR 500/230 kV MORADA NOVA TR1 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 1,037,826.74 | 6/1/2025 | Prevista | T2024-195-B | - SE 500/230 kV Morada Nova - (6+1R) x 300 MVA. | ||||
| Nova Era Ceará | MORADA NOVA | IB 500 kV MG 500 kV MORADA NOVA MG2 CE IB3 | RB | FT MG 500 kV MORADA NOVA MG2 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$594,096.87 | 6/1/2025 | Prevista | T2024-195-C | - Seccionamento da LT 500 kV Açu III – Quixadá – C1 na subestação Morada Nova;- Remanejamento de banco de reator de linha de 150Mvar da LT 500kV Açu III – Quixadá C1 da SE Quixadá para a barra da SE Morada Nova, incluindo a instalação do respectivo Módulo de Conexão de Reator de Barra;- Unidade de reator monofásico reserva de 50Mvar em 500kV associado ao reator de barra da SE Morada Nova que será remanejado da SE Quixadá | ||||
| Nova Era Ceará | MORADA NOVA | IB 500 kV MG 500 kV MORADA NOVA MG1 CE IB2 | RB | FT MG 500 kV MORADA NOVA MG1 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 2,292,558.12 | 6/1/2025 | Prevista | T2024-195-B | - SE 500/230 kV Morada Nova - (6+1R) x 300 MVA. | ||||
| Nova Era Ceará | MORADA NOVA | IB 500 kV MG 500 kV MORADA NOVA MG1 CE IB1 | RB | FT MG 500 kV MORADA NOVA MG1 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 2,292,558.12 | 6/1/2025 | Prevista | T2024-195-B | - SE 500/230 kV Morada Nova - (6+1R) x 300 MVA. | ||||
| Nova Era Ceará | MORADA NOVA | IB 230 kV MG 500 kV MORADA NOVA MG1 CE IB1 | RB | FT MG 500 kV MORADA NOVA MG1 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$793,111.80 | 6/1/2025 | Prevista | T2024-195-B | - SE 500/230 kV Morada Nova - (6+1R) x 300 MVA. | ||||
| Nova Era Ceará | MORADA NOVA | EL 500 kV MORADA NOVA LT 500 kV QUIXADA /MORADA NOVA C-1 CE | RB | FT LT 500 kV QUIXADA /MORADA NOVA C-1 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 1,435,710.17 | 6/1/2025 | Prevista | T2024-195-C | - Seccionamento da LT 500 kV Açu III – Quixadá – C1 na subestação Morada Nova;- Remanejamento de banco de reator de linha de 150Mvar da LT 500kV Açu III – Quixadá C1 da SE Quixadá para a barra da SE Morada Nova, incluindo a instalação do respectivo Módulo de Conexão de Reator de Barra;- Unidade de reator monofásico reserva de 50Mvar em 500kV associado ao reator de barra da SE Morada Nova que será remanejado da SE Quixadá | ||||
| Nova Era Ceará | MORADA NOVA | EL 500 kV MORADA NOVA LT 500 kV MORADA NOVA /PACATUBA C-1 CE | RB | FT LT 500 kV MORADA NOVA /PACATUBA C-1 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 1,435,278.18 | 6/1/2025 | Prevista | T2024-195-A | LT 500 kV Morada Nova - Pacatuba C1, CS, | ||||
| Nova Era Ceará | MORADA NOVA | EL 500 kV MORADA NOVA LT 500 kV MORADA NOVA /ACU III C-1 CE/RN | RB | FT LT 500 kV MORADA NOVA /ACU III C-1 CE/RN | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 1,435,710.17 | 6/1/2025 | Prevista | T2024-195-C | - Seccionamento da LT 500 kV Açu III – Quixadá – C1 na subestação Morada Nova;- Remanejamento de banco de reator de linha de 150Mvar da LT 500kV Açu III – Quixadá C1 da SE Quixadá para a barra da SE Morada Nova, incluindo a instalação do respectivo Módulo de Conexão de Reator de Barra;- Unidade de reator monofásico reserva de 50Mvar em 500kV associado ao reator de barra da SE Morada Nova que será remanejado da SE Quixadá | ||||
| Nova Era Ceará | MORADA NOVA | EL 230 kV MORADA NOVA LT 230 kV MORADA NOVA /RUSSAS II C-2 CE | RB | FT LT 230 kV MORADA NOVA /RUSSAS II C-2 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 1,121,827.68 | 6/1/2025 | Prevista | T2024-195-D | - Seccionamento da LT 230 kV Banabuiú – Russas II – C2 na subestação Morada Nova. | ||||
| Nova Era Ceará | MORADA NOVA | EL 230 kV MORADA NOVA LT 230 kV MORADA NOVA /RUSSAS II C-1 CE | RB | FT LT 230 kV MORADA NOVA /RUSSAS II C-1 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 1,122,114.87 | 6/1/2025 | Prevista | T2024-195-F | - LT 230 kV Morada Nova - Russas II, C1, CS; | ||||
| Nova Era Ceará | MORADA NOVA | EL 230 kV MORADA NOVA LT 230 kV BANABUIU /MORADA NOVA C-2 CE | RB | FT LT 230 kV BANABUIU /MORADA NOVA C-2 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 1,121,827.68 | 6/1/2025 | Prevista | T2024-195-D | - Seccionamento da LT 230 kV Banabuiú – Russas II – C2 na subestação Morada Nova. | ||||
| Nova Era Ceará | MORADA NOVA | EL 230 kV MORADA NOVA LT 230 kV BANABUIU /MORADA NOVA C-1 CE | RB | FT LT 230 kV BANABUIU /MORADA NOVA C-1 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 1,122,451.34 | 6/1/2025 | Prevista | T2024-195-E | - LT 230 kV Banabuiú - Morada Nova, C1, CS; | ||||
| Nova Era Ceará | MORADA NOVA | EL 230 kV MORADA NOVA LT 230 kV ALEX /MORADA NOVA C-1 CE | RB | FT LT 230 kV ALEX /MORADA NOVA C-1 CE | 006/2024 | IPCA | RBL | CC 006/2024 | R$ 1,122,227.29 | 6/1/2025 | Prevista | T2024-195-G | - LT 230 kV Alex - Morada Nova, C1, CS; | ||||
| AXIA Energia Nordeste | MORRO CHAPEU II | TT 69/0 kV MORRO CHAPEU II TA1 BA | ICG | 009/2011 | IPCA | RICG | CC 009/2011 | 8/6/2017 | 8/5/2035 | R$239,636.82 | 6/1/2025 | Ativa | T2012-031 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | MORRO CHAPEU II | TR 230/69 kV MORRO CHAPEU II TR2 BA | ICG | 009/2011 | IPCA | RICGNI | REA 8159/2019 | 12/18/2023 | 8/5/2035 | R$ 1,816,188.42 | 6/1/2025 | Ativa | T2019-030 | Instalação do segundo transformador trifásico 230/69 kV, 150 MVA. | |||
| AXIA Energia Nordeste | MORRO CHAPEU II | TR 230/69 kV MORRO CHAPEU II TR1 BA | ICG | 009/2011 | IPCA | RICG | CC 009/2011 | 8/6/2017 | 8/5/2035 | R$ 1,640,020.35 | 6/1/2025 | Ativa | T2012-031 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | MORRO CHAPEU II | RTB 230 kV 22,4 Mvar MORRO CHAPEU II RT1 BA | RB | FT RTB 230 kV 22,4 Mvar MORRO CHAPEU II RT1 BA | 009/2011 | IPCA | RBL | CC 009/2011 | 8/6/2017 | 10/13/2041 | R$540,720.14 | 6/1/2025 | Ativa | T2012-031 | * Considerando o adicional de RGR conforme disposto na RH nº 1.150, de 07/06/2011. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MORRO CHAPEU II | MG 230 kV MORRO CHAPEU II MG1 BA | RB | FT MG 230 kV MORRO CHAPEU II MG1 BA | 009/2011 | IPCA | RBL | CC 009/2011 | 8/6/2017 | 10/13/2041 | R$824,382.32 | 6/1/2025 | Ativa | T2012-031 | * Considerando o adicional de RGR conforme disposto na RH nº 1.150, de 07/06/2011. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MORRO CHAPEU II | MG 230 kV MORRO CHAPEU II MG1 BA | RB | FT MG 230 kV MORRO CHAPEU II MG1 BA | 009/2011 | IPCA | RBNI | REA 8159/2019 | 12/18/2023 | 12/17/2054 | R$145,302.02 | 6/1/2025 | Ativa | T2019-030 | Complementação do módulo geral da subestação Morro do Chapéu II com um módulo de infraestrutura de manobra em 230 kV. | ||
| AXIA Energia Nordeste | MORRO CHAPEU II | MG 230 kV MORRO CHAPEU II MG1 BA | RB | FT MG 230 kV MORRO CHAPEU II MG1 BA | 009/2011 | IPCA | RBNI | REA 8159/2019 | 12/18/2023 | 8/6/2035 | R$66,265.77 | 6/1/2025 | Ativa | T2019-030 | Complementação do módulo geral da subestação Morro do Chapéu IIcom um módulo de infraestrutura de manobra em 69 kV. | ||
| AXIA Energia Nordeste | MORRO CHAPEU II | MG 230 kV MORRO CHAPEU II MG1 BA | RB | FT MG 230 kV MORRO CHAPEU II MG1 BA | 009/2011 | IPCA | RBNI | REN 1020/2022 | 11/26/2023 | 11/25/2054 | R$86,570.61 | 6/1/2025 | Ativa | MIM ASSOCIADO: Implantação de Entrada de Linha em69 kV na SE Morro de Chapéu II * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 | |||
| AXIA Energia Nordeste | MORRO CHAPEU II | MG 230 kV MORRO CHAPEU II MG1 BA | RB | FT MG 230 kV MORRO CHAPEU II MG1 BA | 009/2011 | IPCA | RBNI | REN 1020/2022 | 11/25/2023 | 11/24/2054 | R$86,570.61 | 6/1/2025 | Ativa | MIM ASSOCIADO: Implantação de Entrada de Linha em69 kV na SE Morro de Chapéu II * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 | |||
| AXIA Energia Nordeste | MORRO CHAPEU II | MC 69 kV TT 69/0 kV MORRO CHAPEU II TA1 BA | ICG | 009/2011 | IPCA | RICG | CC 009/2011 | 8/6/2017 | 8/5/2035 | R$89,208.64 | 6/1/2025 | Ativa | T2012-031 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | MORRO CHAPEU II | MC 69 kV TR 230/69 kV MORRO CHAPEU II TR2 BA | ICG | 009/2011 | IPCA | RICGNI | REA 8159/2019 | 12/18/2023 | 8/5/2035 | R$386,381.11 | 6/1/2025 | Ativa | T2019-030 | Instalação, na SE MORRO CHAPEU II, de um módulo de conexão, em 69 kV, para o autotransformador TR 230/69 kV MORRO CHAPEU II TR2 BA | |||
| AXIA Energia Nordeste | MORRO CHAPEU II | MC 69 kV TR 230/69 kV MORRO CHAPEU II TR1 BA | ICG | 009/2011 | IPCA | RICG | CC 009/2011 | 8/6/2017 | 8/5/2035 | R$211,373.77 | 6/1/2025 | Ativa | T2012-031 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | MORRO CHAPEU II | MC 230 kV TR 230/69 kV MORRO CHAPEU II TR2 BA | ICG | 009/2011 | IPCA | RICGNI | REA 8159/2019 | 12/18/2023 | 8/5/2035 | R$ 1,029,452.53 | 6/1/2025 | Ativa | T2019-030 | Instalação, na SE MORRO CHAPEU II, de um módulo de conexão, em 230 kV, para o autotransformador TR 230/69 kV MORRO CHAPEU II TR2 BA | |||
| AXIA Energia Nordeste | MORRO CHAPEU II | MC 230 kV TR 230/69 kV MORRO CHAPEU II TR1 BA | ICG | 009/2011 | IPCA | RICG | CC 009/2011 | 8/6/2017 | 8/5/2035 | R$519,665.90 | 6/1/2025 | Ativa | T2012-031 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | MORRO CHAPEU II | MC 230 kV RTB 230 kV 22,4 Mvar MORRO CHAPEU II RT1 BA | RB | FT RTB 230 kV 22,4 Mvar MORRO CHAPEU II RT1 BA | 009/2011 | IPCA | RBL | CC 009/2011 | 8/6/2017 | 10/13/2041 | R$370,737.48 | 6/1/2025 | Ativa | T2012-031 | * Considerando o adicional de RGR conforme disposto na RH nº 1.150, de 07/06/2011. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MORRO CHAPEU II | IB 69 kV MG 230 kV MORRO CHAPEU II MG1 BA IB1 | ICG | 009/2011 | IPCA | RICG | CC 009/2011 | 8/6/2017 | 8/5/2035 | R$144,912.82 | 6/1/2025 | Ativa | T2012-031 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | MORRO CHAPEU II | IB 230 kV MG 230 kV MORRO CHAPEU II MG1 BA IB1 | RB | FT MG 230 kV MORRO CHAPEU II MG1 BA | 009/2011 | IPCA | RBL | CC 009/2011 | 8/6/2017 | 10/13/2041 | R$291,628.29 | 6/1/2025 | Ativa | T2012-031 | * Considerando o adicional de RGR conforme disposto na RH nº 1.150, de 07/06/2011. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MORRO CHAPEU II | EL 69 kV MORRO CHAPEU II DIST2 | DIT | 009/2011 | IPCA | RCDM | REN 1020/2022 | 11/25/2023 | 11/24/2051 | R$532,430.02 | 6/1/2025 | Ativa | Implantação de Entrada de Linha em69 kV na SE Morro do Chapéu II * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 | ||||
| AXIA Energia Nordeste | MORRO CHAPEU II | EL 69 kV MORRO CHAPEU II DIST1 | DIT | 009/2011 | IPCA | RCDM | REN 1020/2022 | 11/26/2023 | 11/25/2051 | R$532,430.02 | 6/1/2025 | Ativa | Implantação de Entrada de Linha em69 kV na SE Morro do Chapéu II * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 | ||||
| AXIA Energia Nordeste | MORRO CHAPEU II | EL 230 kV MORRO CHAPEU II LT 230 kV MORRO CHAPEU II /IRECE C-1 BA | RB | FT LT 230 kV MORRO CHAPEU II /IRECE C-1 BA | 009/2011 | IPCA | RBL | CC 009/2011 | 8/6/2017 | 10/13/2041 | R$559,896.80 | 6/1/2025 | Ativa | T2012-031 | * Considerando o adicional de RGR conforme disposto na RH nº 1.150, de 07/06/2011. *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MOSSORO II | TT 69/13,8 kV MOSSORO II TA1 RN | DIT | 061/2001 | IPCA | RCDM | REA 3578/2012 | 7/10/2015 | 3/7/2046 | R$180,016.31 | 6/1/2025 | Ativa | Obra de Substituição Completa - Substituição de 1 transformador de aterramento: 02A1. INCLUIDA NO CICLO 2016/2017 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MOSSORO II | TR 69/3,3 kV MOSSORO II TR5 RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$95,434.32 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOSSORO II | TR 69/3,3 kV MOSSORO II TR5 RN | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$267,804.83 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOSSORO II | TR 69/3,3 kV MOSSORO II TR5 RN | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$246,883.34 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOSSORO II | TR 69/3,3 kV MOSSORO II TR5 RN | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 4/23/2015 | 4/22/2039 | R$1,952.90 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE PARARAIOS, POSIÇÃO 72T5 FASES A DA SUB MOSSORÓ II * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MOSSORO II | TR 69/3,3 kV MOSSORO II TR5 RN | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 4/23/2015 | 4/22/2039 | R$3,905.81 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE PARARAIOS, POSIÇÃO 72T5 FASES B e C DA SUB MOSSORÓ II * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MOSSORO II | TR 230/69 kV MOSSORO II TR6 RN | RBF | FT TR 230/69 kV MOSSORO II TR6 RN | 061/2001 | IPCA | RBNI | REA 3892/2013 | 5/12/2016 | 12/22/2050 | R$ 1,351,469.10 | 6/1/2025 | Ativa | T2013-006 | SE Mossoró II - Implantação de um transformador trifásico 230/69 kV - 100 MVA. * (Receita alterada devido à alteração do perfil de plano para decrescente). *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MOSSORO II | TR 230/69 kV MOSSORO II TR3 RN | RBF | FT TR 230/69 kV MOSSORO II TR3 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | TR 230/69 kV MOSSORO II TR2 RN | RBF | FT TR 230/69 kV MOSSORO II TR2 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | TR 230/69 kV MOSSORO II TR2 RN | RBF | FT TR 230/69 kV MOSSORO II TR2 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | TR 230/69 kV MOSSORO II TR2 RN | RBF | FT TR 230/69 kV MOSSORO II TR2 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$913,997.96 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | TR 230/69 kV MOSSORO II TR2 RN | RBF | FT TR 230/69 kV MOSSORO II TR2 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/18/2017 | 5/26/2052 | R$10,514.31 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | TR 230/69 kV MOSSORO II TR1 RN | RBF | FT TR 230/69 kV MOSSORO II TR1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | TR 230/69 kV MOSSORO II TR1 RN | RBF | FT TR 230/69 kV MOSSORO II TR1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | TR 230/69 kV MOSSORO II TR1 RN | RBF | FT TR 230/69 kV MOSSORO II TR1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$913,997.96 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | TR 230/69 kV MOSSORO II TR1 RN | RBF | FT TR 230/69 kV MOSSORO II TR1 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/15/2017 | 5/23/2052 | R$10,511.94 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | RTB 230 kV 22,14 Mvar MOSSORO II RT1 RN | RB | FT RTB 230 kV 22,14 Mvar MOSSORO II RT1 RN | 061/2001 | IPCA | RBNI | REA 3620/2012 | 5/26/2014 | 3/18/2049 | R$565,195.20 | 6/1/2025 | Ativa | T2012-063 | Instalação, na SE Mossoró II, de um reator de barra trifásico 230 kV de 20 Mvar. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MOSSORO II | RTB 13,8 kV 5 Mvar MOSSORO II RT3 RN | RBF | FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | RTB 13,8 kV 5 Mvar MOSSORO II RT3 RN | RBF | FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$351,841.75 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | RTB 13,8 kV 5 Mvar MOSSORO II RT3 RN | RBF | FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$324,355.11 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | RTB 13,8 kV 5 Mvar MOSSORO II RT3 RN | RBF | FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/12/2016 | 5/11/2031 | R$1,301.67 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | RTB 13,8 kV 5 Mvar MOSSORO II RT2 RN | RBF | FT RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | RTB 13,8 kV 5 Mvar MOSSORO II RT2 RN | RBF | FT RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/12/2016 | 5/11/2031 | R$1,301.67 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | RTB 13,8 kV 5 Mvar MOSSORO II RT1 RN | RBF | FT RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$125,381.53 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | RTB 13,8 kV 5 Mvar MOSSORO II RT1 RN | RBF | FT RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$351,841.75 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | RTB 13,8 kV 5 Mvar MOSSORO II RT1 RN | RBF | FT RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/12/2016 | 5/11/2031 | R$1,301.67 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | MG 230 kV MOSSORO II MG1 RN | RB | FT MG 230 kV MOSSORO II MG1 RN | 061/2001 | IPCA | RBNI | REA 3892/2013 | 5/12/2016 | 9/21/2046 | R$241,993.59 | 6/1/2025 | Ativa | T2013-006 | SE Mossoró - Acréscimo no módulo geral em 230 kV com a implantação de um módulo de infraestrutura de manobra para o módulo de conexão de transformador em 230 kV, arranjo BD5, e um módulo de infraestruturade manobra para o módulo de conexão de transformador em 69 kV, arranjo BPT, associados ao 4º Transf. Trifásico 230/69 kV - 100 MVA. * (Receita alterada devido à alteração do perfil de plano para decrescente). *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MOSSORO II | MG 230 kV MOSSORO II MG1 RN | RB | FT MG 230 kV MOSSORO II MG1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$598,129.20 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | MG 230 kV MOSSORO II MG1 RN | RB | FT MG 230 kV MOSSORO II MG1 RN | 061/2001 | IPCA | RMEL | REN 643/2014 | 8/30/2013 | 8/29/2030 | R$19,366.16 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCOS DE BATERIAS 700A5 E 700A6 DE 48 Vcc. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | MG 230 kV MOSSORO II MG1 RN | RB | FT MG 230 kV MOSSORO II MG1 RN | 061/2001 | IPCA | RBNI | REA 2376/2010 | 10/23/2014 | 10/22/2044 | R$22,228.57 | 6/1/2025 | Ativa | Complementação do módulo geral da Subestação Mossoró II com um módulo de infraestrutura de manobra referente a EL 69 kV Mossoró II-Baraúnas.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | MG 230 kV MOSSORO II MG1 RN | RB | FT MG 230 kV MOSSORO II MG1 RN | 061/2001 | IPCA | RBNI | REA 1814/2009 | 10/23/2014 | 10/22/2044 | R$52,742.15 | 6/1/2025 | Ativa | Complementação do módulo geral da Subestação Mossoró II com um módulo de infraestrutura de manobra referente a EL 69 kV Mossoró II-Dix Sept Rosado.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | MG 230 kV MOSSORO II MG1 RN | RB | FT MG 230 kV MOSSORO II MG1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,678,451.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | MG 230 kV MOSSORO II MG1 RN | RB | FT MG 230 kV MOSSORO II MG1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,547,327.29 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | MG 230 kV MOSSORO II MG1 RN | RB | FT MG 230 kV MOSSORO II MG1 RN | 061/2001 | IPCA | RMEL | REN 443/2011 | 1/21/2016 | 1/20/2033 | R$24,378.27 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BATERIAS - 125Vcc * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | MG 230 kV MOSSORO II MG1 RN | RB | FT MG 230 kV MOSSORO II MG1 RN | 061/2001 | IPCA | RMEL | REN 443/2011 | 12/29/2016 | 12/28/2044 | R$65,890.66 | 6/1/2025 | Ativa | Implantação de Sistemas Automáticos de Regulação associados a transformadores. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | MG 230 kV MOSSORO II MG1 RN | RB | FT MG 230 kV MOSSORO II MG1 RN | 061/2001 | IPCA | RBNI | REN 1020/2022 | 11/19/2023 | 11/18/2054 | R$51,719.33 | 6/1/2025 | Ativa | MIM associado à instalação de um módulo de entrada de linha de 69 kV, arranjo BPT, com destino à SE Cimento Mizu na SE Mossoró II. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 | |||
| AXIA Energia Nordeste | MOSSORO II | MG 230 kV MOSSORO II MG1 RN | RB | FT MG 230 kV MOSSORO II MG1 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/4/2020 | 12/25/2038 | R$507,456.45 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | MC 69 kV TT 69/13,8 kV MOSSORO II TA1 RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOSSORO II | MC 69 kV TR 69/3,3 kV MOSSORO II TR5 RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOSSORO II | MC 69 kV TR 69/3,3 kV MOSSORO II TR5 RN | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOSSORO II | MC 69 kV TR 69/3,3 kV MOSSORO II TR5 RN | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/11/2021 | 6/14/2051 | R$33,650.52 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MOSSORO II | MC 69 kV TR 230/69 kV MOSSORO II TR6 RN | RBF | FT TR 230/69 kV MOSSORO II TR6 RN | 061/2001 | IPCA | RBNI | REA 3892/2013 | 5/12/2016 | 7/20/2048 | R$371,069.32 | 6/1/2025 | Ativa | T2013-006 | SE Mossoró II - Implantação de um módulo de conexão de transformador em 69 kV, arranjo BPT, associado ao 4º transformador trifásico 230/69 kV - 100 MVA. * (Receita alterada devido à alteração do perfil de plano para decrescente). *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MOSSORO II | MC 69 kV TR 230/69 kV MOSSORO II TR3 RN | RBF | FT TR 230/69 kV MOSSORO II TR3 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | MC 69 kV TR 230/69 kV MOSSORO II TR2 RN | RBF | FT TR 230/69 kV MOSSORO II TR2 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | MC 69 kV TR 230/69 kV MOSSORO II TR2 RN | RBF | FT TR 230/69 kV MOSSORO II TR2 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/18/2019 | 9/3/2047 | R$28,515.54 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | MC 69 kV TR 230/69 kV MOSSORO II TR1 RN | RBF | FT TR 230/69 kV MOSSORO II TR1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | MC 69 kV TR 230/69 kV MOSSORO II TR1 RN | RBF | FT TR 230/69 kV MOSSORO II TR1 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/29/2019 | 1/1/2048 | R$38,941.51 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | MC 230 kV TR 230/69 kV MOSSORO II TR6 RN | RBF | FT TR 230/69 kV MOSSORO II TR6 RN | 061/2001 | IPCA | RBNI | REA 3892/2013 | 5/12/2016 | 8/17/2048 | R$ 1,026,894.54 | 6/1/2025 | Ativa | T2013-006 | SE Mossoró II - Implantação de um módulo de conexão de transformador em 230 kV, arranjo BD5, associado ao 4º transformador trifásico 230/69 kV - 100 MVA. * (Receita alterada devido à alteração do perfil de plano para decrescente). *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MOSSORO II | MC 230 kV TR 230/69 kV MOSSORO II TR6 RN | RBF | FT TR 230/69 kV MOSSORO II TR6 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2022 | 12/30/2037 | R$1,622.02 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | MC 230 kV TR 230/69 kV MOSSORO II TR3 RN | RBF | FT TR 230/69 kV MOSSORO II TR3 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | MC 230 kV TR 230/69 kV MOSSORO II TR3 RN | RBF | FT TR 230/69 kV MOSSORO II TR3 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2022 | 12/30/2037 | R$1,550.81 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | MC 230 kV TR 230/69 kV MOSSORO II TR2 RN | RBF | FT TR 230/69 kV MOSSORO II TR2 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | MC 230 kV TR 230/69 kV MOSSORO II TR2 RN | RBF | FT TR 230/69 kV MOSSORO II TR2 RN | 061/2001 | IPCA | RMEL | REN 443/2011 | 4/23/2017 | 5/1/2048 | R$57,503.80 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC 230 kV - 94T2 A/B/C * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | MC 230 kV TR 230/69 kV MOSSORO II TR2 RN | RBF | FT TR 230/69 kV MOSSORO II TR2 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/6/2022 | 2/19/2044 | R$6,622.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | MC 230 kV TR 230/69 kV MOSSORO II TR1 RN | RBF | FT TR 230/69 kV MOSSORO II TR1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | MC 230 kV TR 230/69 kV MOSSORO II TR1 RN | RBF | FT TR 230/69 kV MOSSORO II TR1 RN | 061/2001 | IPCA | RMEL | REN 443/2011 | 1/23/2015 | 1/22/2039 | R$12,174.12 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE PARARAIOS, POSIÇÃO 74T1 FASE A e B DA SE MOSSORO II * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | MC 230 kV TR 230/69 kV MOSSORO II TR1 RN | RBF | FT TR 230/69 kV MOSSORO II TR1 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/25/2021 | 12/26/2050 | R$66,653.78 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | MC 230 kV RTB 230 kV 22,14 Mvar MOSSORO II RT1 RN | RB | FT RTB 230 kV 22,14 Mvar MOSSORO II RT1 RN | 061/2001 | IPCA | RBNI | REA 3620/2012 | 5/26/2014 | 11/29/2046 | R$956,504.75 | 6/1/2025 | Ativa | T2012-063 | Instalação, na SE Mossoró II, de um módulo de conexão em 230 kV, arranjo barra dupla a 5 chaves, para reator de barra trifásico 230 kV, de 20 Mvar. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MOSSORO II | MC 230 kV RTB 230 kV 22,14 Mvar MOSSORO II RT1 RN | RB | FT RTB 230 kV 22,14 Mvar MOSSORO II RT1 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2022 | 12/30/2037 | R$2,500.39 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | MC 13,8 kV TR 230/69 kV MOSSORO II TR2 RN | RBF | FT TR 230/69 kV MOSSORO II TR2 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | MC 13,8 kV TR 230/69 kV MOSSORO II TR1 RN | RBF | FT TR 230/69 kV MOSSORO II TR1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | MC 13,8 kV RTB 13,8 kV 5 Mvar MOSSORO II RT3 RN | RBF | FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,598.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | MC 13,8 kV RTB 13,8 kV 5 Mvar MOSSORO II RT3 RN | RBF | FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,662.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | MC 13,8 kV RTB 13,8 kV 5 Mvar MOSSORO II RT2 RN | RBF | FT RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,598.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | MC 13,8 kV RTB 13,8 kV 5 Mvar MOSSORO II RT2 RN | RBF | FT RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,662.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | MC 13,8 kV RTB 13,8 kV 5 Mvar MOSSORO II RT1 RN | RBF | FT RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,598.65 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | MC 13,8 kV RTB 13,8 kV 5 Mvar MOSSORO II RT1 RN | RBF | FT RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,662.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | MC 13,8 kV BC 13,8 kV 3,6 Mvar MOSSORO II BC4 RN | RBF | FT BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | MC 13,8 kV BC 13,8 kV 3,6 Mvar MOSSORO II BC4 RN | RBF | FT BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | MC 13,8 kV BC 13,8 kV 3,6 Mvar MOSSORO II BC4 RN | RBF | FT BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/12/2016 | 5/11/2031 | R$1,301.67 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | MC 13,8 kV BC 13,8 kV 3,6 Mvar MOSSORO II BC3 RN | RBF | FT BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | MC 13,8 kV BC 13,8 kV 3,6 Mvar MOSSORO II BC3 RN | RBF | FT BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | MC 13,8 kV BC 13,8 kV 3,6 Mvar MOSSORO II BC3 RN | RBF | FT BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/12/2016 | 5/11/2031 | R$1,301.67 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | MC 13,8 kV BC 13,8 kV 3,6 Mvar MOSSORO II BC2 RN | RBF | FT BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | MC 13,8 kV BC 13,8 kV 3,6 Mvar MOSSORO II BC2 RN | RBF | FT BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | MC 13,8 kV BC 13,8 kV 3,6 Mvar MOSSORO II BC1 RN | RBF | FT BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | MC 13,8 kV BC 13,8 kV 3,6 Mvar MOSSORO II BC1 RN | RBF | FT BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | MC 13,8 kV BC 13,8 kV 3,6 Mvar MOSSORO II BC1 RN | RBF | FT BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/12/2016 | 5/11/2031 | R$2,603.33 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | IB 69 kV MG 230 kV MOSSORO II MG1 RN IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOSSORO II | IB 230 kV MG 230 kV MOSSORO II MG1 RN IB1 | RB | FT MG 230 kV MOSSORO II MG1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$133,085.23 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | EL 69 kV MOSSORO II ROSADO-02J1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOSSORO II | EL 69 kV MOSSORO II ROSADO-02J1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/20/2022 | 12/23/2050 | R$42,546.15 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MOSSORO II | EL 69 kV MOSSORO II ROSADO 02J8 | DIT | 061/2001 | IPCA | RCDM | REA 1814/2009 | 10/23/2014 | 2/6/2047 | R$383,665.37 | 6/1/2025 | Ativa | Instalação de 01 (uma) EL 69 kV para Dix Sept Rosado. Incluída após Recurso em face da REH 1.918/2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MOSSORO II | EL 69 kV MOSSORO II MOSSOROIII-02J2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOSSORO II | EL 69 kV MOSSORO II MOSSOROIII-02J2 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/10/2016 | 5/9/2031 | R$2,602.39 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MOSSORO II | EL 69 kV MOSSORO II MOSSOROIII-02J2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/7/2021 | 7/12/2050 | R$42,004.46 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MOSSORO II | EL 69 kV MOSSORO II MOSSORO I-02J3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOSSORO II | EL 69 kV MOSSORO II MOSSORO I-02J3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOSSORO II | EL 69 kV MOSSORO II MOSSORO I-02J3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOSSORO II | EL 69 kV MOSSORO II MOSSORO I-02J3 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/10/2016 | 5/9/2031 | R$2,602.39 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MOSSORO II | EL 69 kV MOSSORO II MOSSORO I-02J3 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/10/2022 | 12/13/2050 | R$42,512.99 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MOSSORO II | EL 69 kV MOSSORO II MAISA-02J7 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOSSORO II | EL 69 kV MOSSORO II MAISA-02J7 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOSSORO II | EL 69 kV MOSSORO II GROSSOS-02J6 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOSSORO II | EL 69 kV MOSSORO II GROSSOS-02J6 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOSSORO II | EL 69 kV MOSSORO II GROSSOS-02J6 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/10/2016 | 5/9/2031 | R$2,602.39 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MOSSORO II | EL 69 kV MOSSORO II GROSSOS-02J6 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/9/2021 | 1/11/2050 | R$41,398.77 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MOSSORO II | EL 69 kV MOSSORO II C.MIZU 12S1 | DIT | 061/2001 | IPCA | RCDM | REN 1020/2022 | 11/19/2023 | 11/18/2051 | R$637,805.13 | 6/1/2025 | Ativa | Instalar um módulo de entrada de linha de 69 kV, arranjo BPT, com destino à SE Cimento Mizu na SE Mossoró II. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 | ||||
| AXIA Energia Nordeste | MOSSORO II | EL 69 kV MOSSORO II C.AMARO-02J5 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOSSORO II | EL 69 kV MOSSORO II C.AMARO-02J5 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOSSORO II | EL 69 kV MOSSORO II C.AMARO-02J5 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/21/2022 | 12/24/2050 | R$42,551.35 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MOSSORO II | EL 69 kV MOSSORO II BARROCAS-02J4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOSSORO II | EL 69 kV MOSSORO II BARROCAS-02J4 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/10/2016 | 5/9/2031 | R$ 916.41 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MOSSORO II | EL 69 kV MOSSORO II BARROCAS-02J4 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/10/2022 | 9/14/2050 | R$16,615.64 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MOSSORO II | EL 69 kV MOSSORO II BARAUNAS 02J9 | DIT | 061/2001 | IPCA | RCDM | REA 2376/2010 | 10/23/2014 | 2/6/2047 | R$383,665.37 | 6/1/2025 | Ativa | Instalação de 01 (uma) EL 69 kV Mossoró II-Baraúnas.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MOSSORO II | EL 230 kV MOSSORO II LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN | RB | FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | EL 230 kV MOSSORO II LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN | RB | FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN | 061/2001 | IPCA | RMEL | REN 643/2014 | 4/30/2014 | 4/29/2042 | R$34,342.00 | 6/1/2025 | Ativa | Substituição do sistema de proteção da LT Russas II-Mossoró II 04L1 na SE Mossoró II, por proteção digital (retrofit) Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | EL 230 kV MOSSORO II LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN | RB | FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/7/2017 | 5/15/2048 | R$57,571.59 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC 230 kV - 94L1 A/B/C * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | EL 230 kV MOSSORO II LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN | RB | FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/29/2021 | 9/27/2048 | R$85,819.33 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | EL 230 kV MOSSORO II LT 230 kV MOSSORO IV /MOSSORO II C-1 RN | RB | FT LT 230 kV MOSSORO IV /MOSSORO II C-1 RN | 018/2012 | IPCA | RBL | CC 018/2012 | 10/28/2017 | 6/1/2042 | R$611,676.76 | 6/1/2025 | Ativa | T2012-114-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MOSSORO II | EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-2 RN | RB | FT LT 230 kV MOSSORO II /ACU III C-2 RN | 019/2010 | IPCA | RBL | CC 019/2010 | 11/23/2010 | 11/23/2040 | R$404,537.24 | 6/1/2025 | Ativa | T2010-090-B | Rede Básica e ICGLT, C3, 230 kV Paraíso - Açu II; LT, C2, 230 kV Açu II - Mossoró II; (Rede Básica). *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Nordeste | MOSSORO II | EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-1 RN | RB | FT LT 230 kV MOSSORO II /ACU III C-1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-1 RN | RB | FT LT 230 kV MOSSORO II /ACU III C-1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-1 RN | RB | FT LT 230 kV MOSSORO II /ACU III C-1 RN | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/22/2016 | 5/25/2046 | R$14,373.62 | 6/1/2025 | Ativa | Substituído TC QDR 245 com alta taxa de falha. Posição Operacional: 84L2-B/MSD. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-1 RN | RB | FT LT 230 kV MOSSORO II /ACU III C-1 RN | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/22/2016 | 5/25/2046 | R$14,373.62 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC NISSIN 230KV * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-1 RN | RB | FT LT 230 kV MOSSORO II /ACU III C-1 RN | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/22/2016 | 5/25/2046 | R$14,373.62 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC NISSIN 230KV * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-1 RN | RB | FT LT 230 kV MOSSORO II /ACU III C-1 RN | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/22/2016 | 5/25/2046 | R$14,373.62 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE TC NISSIN 230KV * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-1 RN | RB | FT LT 230 kV MOSSORO II /ACU III C-1 RN | 061/2001 | IPCA | RBNI | REA 5861/2016 | 6/10/2016 | 6/9/2044 | R$21,851.09 | 6/1/2025 | Ativa | EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU II C-1 RN * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-1 RN | RB | FT LT 230 kV MOSSORO II /ACU III C-1 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/9/2018 | 2/12/2048 | R$34,538.51 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | EL 230 kV MOSSORO II LT 230 kV BANABUIU /MOSSORO II C-2 CE/RN | RB | FT LT 230 kV BANABUIU /MOSSORO II C-2 CE/RN | 061/2001 | IPCA | RBNI | REA 2173/2009 | 6/6/2016 | 7/24/2048 | R$ 1,161,030.85 | 6/1/2025 | Ativa | T2009-154 | Instalar um módulo de entrada de linha 230 kV, arranjo barra dupla a cinco chaves, na SE Mossoró II para o segundo circuito da LT 230kV Banabuiu / Mossoró II *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | MOSSORO II | EL 230 kV MOSSORO II LT 230 kV ALEX /MOSSORO II C-1 CE/RN | RB | FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$225,893.95 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | EL 230 kV MOSSORO II LT 230 kV ALEX /MOSSORO II C-1 CE/RN | RB | FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN | 061/2001 | IPCA | RMEL | REN 643/2014 | 11/30/2014 | 11/29/2042 | R$35,102.30 | 6/1/2025 | Ativa | Substituição do sistema de proteção da LT Banabuiu-Mossoró II 04C4 na SE Mossoró II, por proteção digital (retrofit) Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | EL 230 kV MOSSORO II LT 230 kV ALEX /MOSSORO II C-1 CE/RN | RB | FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$633,896.59 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | EL 230 kV MOSSORO II LT 230 kV ALEX /MOSSORO II C-1 CE/RN | RB | FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$584,375.21 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | EL 230 kV MOSSORO II LT 230 kV ALEX /MOSSORO II C-1 CE/RN | RB | FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/11/2021 | 5/1/2041 | R$5,736.90 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MOSSORO II | EL 230 kV MOSSORO II AREIA BRANCA | DIT | 061/2001 | IPCA | RCDM | REA 6674/2017 | 4/2/2014 | 12/31/2042 | R$68,051.68 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha - EL 230 kV, arranjo BD4, na SE Mossoró II, associada à linha de transmissão LT Mossoró II - Areia Branca *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MOSSORO II | EL 230 kV MOSSORO II AREIA BRANCA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2022 | 12/30/2037 | R$3,274.31 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MOSSORO II | CE 20/-0 Mvar MOSSORO II CE1 RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$531,720.90 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOSSORO II | CE 20/-0 Mvar MOSSORO II CE1 RN | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,492,098.70 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOSSORO II | BC 13,8 kV 3,6 Mvar MOSSORO II BC4 RN | RBF | FT BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$29,742.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | BC 13,8 kV 3,6 Mvar MOSSORO II BC4 RN | RBF | FT BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$83,462.83 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | BC 13,8 kV 3,6 Mvar MOSSORO II BC3 RN | RBF | FT BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$29,742.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | BC 13,8 kV 3,6 Mvar MOSSORO II BC3 RN | RBF | FT BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$83,462.83 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | BC 13,8 kV 3,6 Mvar MOSSORO II BC2 RN | RBF | FT BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$29,742.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | BC 13,8 kV 3,6 Mvar MOSSORO II BC2 RN | RBF | FT BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$83,462.83 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | BC 13,8 kV 3,6 Mvar MOSSORO II BC1 RN | RBF | FT BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$29,742.63 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO II | BC 13,8 kV 3,6 Mvar MOSSORO II BC1 RN | RBF | FT BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$83,462.83 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MOSSORO IV | TT 69/0 kV MOSSORO IV TT1 RN | ICG | 018/2012 | IPCA | RICG | CC 018/2012 | 10/28/2017 | 11/1/2035 | R$14,947.24 | 6/1/2025 | Ativa | T2012-114-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | MOSSORO IV | TR 230/69 kV MOSSORO IV TR2 RN | ICG | 018/2012 | IPCA | RICGNI | DSP 553/2024 | R$ 1,698,229.39 | 6/1/2025 | Prevista | T2024-006 | Instalação do 2º Transformador de Potência 230/69 kVde 100 MVA Trifásico na SE Mossoró IV | |||||
| AXIA Energia Nordeste | MOSSORO IV | TR 230/69 kV MOSSORO IV TR1 RN | ICG | 018/2012 | IPCA | RICG | CC 018/2012 | 10/28/2017 | 11/1/2035 | R$234,238.82 | 6/1/2025 | Ativa | T2012-114-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | MOSSORO IV | MG 230 kV MOSSORO IV MG1 RN | RB | FT MG 230 kV MOSSORO IV MG1 RN | 018/2012 | IPCA | RBL | CC 018/2012 | 10/28/2017 | 6/1/2042 | R$ 1,020,342.89 | 6/1/2025 | Ativa | T2012-114-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MOSSORO IV | MG 230 kV MOSSORO IV MG1 RN | RB | FT MG 230 kV MOSSORO IV MG1 RN | 018/2012 | IPCA | RBNIA | DSP 553/2024 | R$147,071.48 | 6/1/2025 | Prevista | T2024-006 | Adequação do MIG de 230 kV associada à instalação do 2º Transformador de Potência na SE Mossoró IV | ||||
| AXIA Energia Nordeste | MOSSORO IV | MG 230 kV MOSSORO IV MG1 RN | RB | FT MG 230 kV MOSSORO IV MG1 RN | 018/2012 | IPCA | RBNIA | DSP 553/2024 | R$42,294.54 | 6/1/2025 | Prevista | T2024-006 | Adequação do MIG de 69 kV associada à instalação do 2º Transformador de Potência na SE Mossoró IV | ||||
| AXIA Energia Nordeste | MOSSORO IV | MC 69 kV TT 69/0 kV MOSSORO IV TT1 RN | ICG | 018/2012 | IPCA | RICG | CC 018/2012 | 10/28/2017 | 11/1/2035 | R$15,543.75 | 6/1/2025 | Ativa | T2012-114-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | MOSSORO IV | MC 69 kV TR 230/69 kV MOSSORO IV TR2 RN | ICG | 018/2012 | IPCA | RICGNI | DSP 553/2024 | R$468,100.63 | 6/1/2025 | Prevista | T2024-006 | Conexão de Transformador de 69 kV - BPT do 2º Transformador de Potência na SE Mossoró IV | |||||
| AXIA Energia Nordeste | MOSSORO IV | MC 69 kV TR 230/69 kV MOSSORO IV TR1 RN | ICG | 018/2012 | IPCA | RICG | CC 018/2012 | 10/28/2017 | 11/1/2035 | R$36,717.51 | 6/1/2025 | Ativa | T2012-114-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | MOSSORO IV | MC 230 kV TR 230/69 kV MOSSORO IV TR2 RN | ICG | 018/2012 | IPCA | RICGNI | DSP 553/2024 | R$ 1,298,476.48 | 6/1/2025 | Prevista | T2024-006 | Conexão de Transformador de 230 kV - BD4 do 2º Transformador de Potência na SE Mossoró IV | |||||
| AXIA Energia Nordeste | MOSSORO IV | MC 230 kV TR 230/69 kV MOSSORO IV TR1 RN | ICG | 018/2012 | IPCA | RICG | CC 018/2012 | 10/28/2017 | 11/1/2035 | R$92,587.45 | 6/1/2025 | Ativa | T2012-114-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | MOSSORO IV | IB 69 kV MG 230 kV MOSSORO IV MG1 RN IB1 | ICG | 018/2012 | IPCA | RICG | CC 018/2012 | 10/28/2017 | 11/1/2035 | R$25,033.59 | 6/1/2025 | Ativa | T2012-114-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | MOSSORO IV | IB 230 kV MG 230 kV MOSSORO IV MG1 RN IB1 | RB | FT MG 230 kV MOSSORO IV MG1 RN | 018/2012 | IPCA | RBL | CC 018/2012 | 10/28/2017 | 6/1/2042 | R$378,075.66 | 6/1/2025 | Ativa | T2012-114-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MOSSORO IV | EL 230 kV MOSSORO IV LT 230 kV MOSSORO IV /MOSSORO II C-1 RN | RB | FT LT 230 kV MOSSORO IV /MOSSORO II C-1 RN | 018/2012 | IPCA | RBL | CC 018/2012 | 10/28/2017 | 6/1/2042 | R$611,676.76 | 6/1/2025 | Ativa | T2012-114-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | MOXOTO | TR 69/13,8 kV MOXOTO TR2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOXOTO | TR 69/13,8 kV MOXOTO TR2 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$76,466.27 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOXOTO | TR 69/13,8 kV MOXOTO TR1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOXOTO | TR 69/13,8 kV MOXOTO TR1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$76,466.27 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOXOTO | MG 69 kV MOXOTO MG1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$228,270.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOXOTO | MG 69 kV MOXOTO MG1 BA | DIT | 061/2001 | IPCA | RMEL | REN 643/2014 | 2/28/2014 | 2/27/2031 | R$2,408.99 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCO DE BATERIAS 900A1 DE 250 Vcc Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MOXOTO | MG 69 kV MOXOTO MG1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$640,565.99 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOXOTO | MG 69 kV MOXOTO MG1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$590,523.58 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOXOTO | MG 69 kV MOXOTO MG1 BA | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 8/30/2016 | 8/29/2033 | R$6,949.26 | 6/1/2025 | Ativa | Implantação de Banco de Baterias * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MOXOTO | MG 69 kV MOXOTO MG1 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/1/2021 | 8/8/2045 | R$ 820.88 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MOXOTO | MC 69 kV TR 69/13,8 kV MOXOTO TR2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOXOTO | MC 69 kV TR 69/13,8 kV MOXOTO TR1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$56,157.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOXOTO | MC 13,8 kV TR 69/13,8 kV MOXOTO TR2 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOXOTO | MC 13,8 kV TR 69/13,8 kV MOXOTO TR2 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$125,341.16 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOXOTO | MC 13,8 kV TR 69/13,8 kV MOXOTO TR1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOXOTO | MC 13,8 kV TR 69/13,8 kV MOXOTO TR1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$125,341.16 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOXOTO | EL 69 kV MOXOTO LT 69 kV ZEBU II /MOXOTO C-1 AL/BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOXOTO | EL 69 kV MOXOTO LT 69 kV ABAIXADORA /MOXOTO C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOXOTO | EL 13,8 kV MOXOTO DIST6 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOXOTO | EL 13,8 kV MOXOTO DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOXOTO | EL 13,8 kV MOXOTO DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOXOTO | EL 13,8 kV MOXOTO DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOXOTO | EL 13,8 kV MOXOTO DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MOXOTO | EL 13,8 kV MOXOTO DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MULUNGU | TR 69/13,8 kV MULUNGU TR1-B BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MULUNGU | TR 69/13,8 kV MULUNGU TR1-B BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$76,466.27 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MULUNGU | TR 69/13,8 kV MULUNGU TR1-B BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$70,492.55 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MULUNGU | TR 69/13,8 kV MULUNGU TR1-A BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MULUNGU | MG 69 kV MULUNGU MG1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$209,069.75 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MULUNGU | MG 69 kV MULUNGU MG1 BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$586,685.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MULUNGU | MG 69 kV MULUNGU MG1 BA | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 8/30/2016 | 8/29/2033 | R$6,949.26 | 6/1/2025 | Ativa | Implantação de Banco de Baterias * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MULUNGU | MG 69 kV MULUNGU MG1 BA | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/30/2021 | 12/3/2044 | R$ 570.48 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MULUNGU | MC 13,8 kV TR 69/13,8 kV MULUNGU TR1-A BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MULUNGU | MC 13,8 kV TR 69/13,8 kV MULUNGU TR1-A BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$125,341.16 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MULUNGU | MC 13,8 kV TR 69/13,8 kV MULUNGU TR1-A BA | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$115,549.23 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MULUNGU | EL 69 kV MULUNGU LT 69 kV ABAIXADORA /MULUNGU C-1 BA | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$69,302.86 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MULUNGU | EL 69 kV MULUNGU DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$69,302.86 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MULUNGU | EL 13,8 kV MULUNGU DIST5 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MULUNGU | EL 13,8 kV MULUNGU DIST4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MULUNGU | EL 13,8 kV MULUNGU DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MULUNGU | EL 13,8 kV MULUNGU DIST3 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$140,183.79 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MULUNGU | EL 13,8 kV MULUNGU DIST2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MULUNGU | EL 13,8 kV MULUNGU DIST1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MUSSURE II | TT 69/13,8 kV MUSSURE II TA2 PB | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MUSSURE II | TT 69/13,8 kV MUSSURE II TA1 PB | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MUSSURE II | TR 69/13,8 kV MUSSURE II TR5 PB | RB | FT MG 230 kV MUSSURE II MG1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | TR 69/13,8 kV MUSSURE II TR5 PB | RB | FT MG 230 kV MUSSURE II MG1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$76,466.27 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | TR 69/13,8 kV MUSSURE II TR5 PB | RB | FT MG 230 kV MUSSURE II MG1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$70,492.55 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | TR 230/69 kV MUSSURE II TR4 PB | RBF | FT TR 230/69 kV MUSSURE II TR4 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | TR 230/69 kV MUSSURE II TR3 PB | RBF | FT TR 230/69 kV MUSSURE II TR3 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | TR 230/69 kV MUSSURE II TR3 PB | RBF | FT TR 230/69 kV MUSSURE II TR3 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | TR 230/69 kV MUSSURE II TR3 PB | RBF | FT TR 230/69 kV MUSSURE II TR3 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$913,997.96 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | TR 230/69 kV MUSSURE II TR2 PB | RBF | FT TR 230/69 kV MUSSURE II TR2 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | TR 230/69 kV MUSSURE II TR2 PB | RBF | FT TR 230/69 kV MUSSURE II TR2 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | TR 230/69 kV MUSSURE II TR1 PB | RBF | FT TR 230/69 kV MUSSURE II TR1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | TR 230/69 kV MUSSURE II TR1 PB | RBF | FT TR 230/69 kV MUSSURE II TR1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | TR 230/69 kV MUSSURE II TR1 PB | RBF | FT TR 230/69 kV MUSSURE II TR1 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/1/2021 | 3/9/2056 | R$108,548.13 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MUSSURE II | MG 230 kV MUSSURE II MG1 PB | RB | FT MG 230 kV MUSSURE II MG1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$571,108.85 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | MG 230 kV MUSSURE II MG1 PB | RB | FT MG 230 kV MUSSURE II MG1 PB | 061/2001 | IPCA | RMEL | REN 643/2014 | 10/15/2015 | 10/14/2032 | R$17,346.58 | 6/1/2025 | Ativa | Revitalização Necessária: Substituição das Bateriais Saturnia 60PZS400 125 Vcc, Posições 800A1 e 800A2 .Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MUSSURE II | MG 230 kV MUSSURE II MG1 PB | RB | FT MG 230 kV MUSSURE II MG1 PB | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/30/2015 | 9/29/2043 | R$63,066.02 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SISTEMAS AUTOMÁTICOS DE REGULAÇÃO ASSOCIADOS A TRANSFORMADORES..Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MUSSURE II | MG 230 kV MUSSURE II MG1 PB | RB | FT MG 230 kV MUSSURE II MG1 PB | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/24/2015 | 7/23/2030 | R$55,531.70 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SWITCH.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MUSSURE II | MG 230 kV MUSSURE II MG1 PB | RB | FT MG 230 kV MUSSURE II MG1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,602,627.93 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | MG 230 kV MUSSURE II MG1 PB | RB | FT MG 230 kV MUSSURE II MG1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,477,427.14 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | MG 230 kV MUSSURE II MG1 PB | RB | FT MG 230 kV MUSSURE II MG1 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/19/2021 | 7/7/2038 | R$375,136.91 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MUSSURE II | MC 69 kV TT 69/13,8 kV MUSSURE II TA2 PB | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MUSSURE II | MC 69 kV TT 69/13,8 kV MUSSURE II TA1 PB | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MUSSURE II | MC 69 kV TT 69/13,8 kV MUSSURE II TA1 PB | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/20/2021 | 9/19/2049 | R$18,693.52 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MUSSURE II | MC 69 kV TR 69/13,8 kV MUSSURE II TR5 PB | RB | FT MG 230 kV MUSSURE II MG1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$56,157.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | MC 69 kV TR 69/13,8 kV MUSSURE II TR5 PB | RB | FT MG 230 kV MUSSURE II MG1 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$157,587.66 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | MC 69 kV TR 69/13,8 kV MUSSURE II TR5 PB | RB | FT MG 230 kV MUSSURE II MG1 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/19/2021 | 9/11/2037 | R$19,110.23 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MUSSURE II | MC 69 kV TR 230/69 kV MUSSURE II TR4 PB | RBF | FT TR 230/69 kV MUSSURE II TR4 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | MC 69 kV TR 230/69 kV MUSSURE II TR4 PB | RBF | FT TR 230/69 kV MUSSURE II TR4 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/6/2020 | 1/8/2050 | R$8,425.07 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MUSSURE II | MC 69 kV TR 230/69 kV MUSSURE II TR3 PB | RBF | FT TR 230/69 kV MUSSURE II TR3 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | MC 69 kV TR 230/69 kV MUSSURE II TR3 PB | RBF | FT TR 230/69 kV MUSSURE II TR3 PB | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | MC 69 kV TR 230/69 kV MUSSURE II TR3 PB | RBF | FT TR 230/69 kV MUSSURE II TR3 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/21/2020 | 6/15/2048 | R$29,623.00 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MUSSURE II | MC 69 kV TR 230/69 kV MUSSURE II TR2 PB | RBF | FT TR 230/69 kV MUSSURE II TR2 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | MC 69 kV TR 230/69 kV MUSSURE II TR2 PB | RBF | FT TR 230/69 kV MUSSURE II TR2 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/12/2021 | 1/14/2050 | R$41,411.14 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MUSSURE II | MC 69 kV TR 230/69 kV MUSSURE II TR1 PB | RBF | FT TR 230/69 kV MUSSURE II TR1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | MC 69 kV TR 230/69 kV MUSSURE II TR1 PB | RBF | FT TR 230/69 kV MUSSURE II TR1 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/19/2021 | 1/21/2050 | R$41,433.65 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MUSSURE II | MC 69 kV BC 69 kV 21,3 Mvar MUSSURE II BC1 PB | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MUSSURE II | MC 69 kV BC 69 kV 21,3 Mvar MUSSURE II BC1 PB | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MUSSURE II | MC 69 kV BC 69 kV 21,3 Mvar MUSSURE II BC1 PB | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/2/2017 | 11/8/2043 | R$87,143.35 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MUSSURE II | MC 69 kV BC 69 kV 21,2 Mvar MUSSURE II BC2 PB | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MUSSURE II | MC 69 kV BC 69 kV 21,2 Mvar MUSSURE II BC2 PB | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MUSSURE II | MC 69 kV BC 69 kV 21,2 Mvar MUSSURE II BC2 PB | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/29/2017 | 9/13/2043 | R$91,210.15 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MUSSURE II | MC 230 kV TR 230/69 kV MUSSURE II TR4 PB | RBF | FT TR 230/69 kV MUSSURE II TR4 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | MC 230 kV TR 230/69 kV MUSSURE II TR4 PB | RBF | FT TR 230/69 kV MUSSURE II TR4 PB | 061/2001 | IPCA | RMEL | REN 443/2011 | 7/6/2017 | 7/9/2047 | R$9,665.29 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE ISOLADORES DE VIDRO POR PORCELANA, EM ATENDIMENTO A RECOMENDAÇÃO RAP ONS 0053/2013, DA CHAVE SECCIONADORA, POSIÇÃO 34T4-4 DA SE MUSSURÉ II * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | MUSSURE II | MC 230 kV TR 230/69 kV MUSSURE II TR4 PB | RBF | FT TR 230/69 kV MUSSURE II TR4 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/3/2022 | 4/2/2043 | R$142,712.23 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MUSSURE II | MC 230 kV TR 230/69 kV MUSSURE II TR3 PB | RBF | FT TR 230/69 kV MUSSURE II TR3 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | MC 230 kV TR 230/69 kV MUSSURE II TR3 PB | RBF | FT TR 230/69 kV MUSSURE II TR3 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/19/2022 | 7/13/2043 | R$182,009.07 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MUSSURE II | MC 230 kV TR 230/69 kV MUSSURE II TR2 PB | RBF | FT TR 230/69 kV MUSSURE II TR2 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | MC 230 kV TR 230/69 kV MUSSURE II TR2 PB | RBF | FT TR 230/69 kV MUSSURE II TR2 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/26/2021 | 1/16/2045 | R$246,355.13 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MUSSURE II | MC 230 kV TR 230/69 kV MUSSURE II TR1 PB | RBF | FT TR 230/69 kV MUSSURE II TR1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | MC 230 kV TR 230/69 kV MUSSURE II TR1 PB | RBF | FT TR 230/69 kV MUSSURE II TR1 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/18/2022 | 3/21/2045 | R$264,855.12 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MUSSURE II | IB 69 kV MG 230 kV MUSSURE II MG1 PB IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MUSSURE II | IB 69 kV MG 230 kV MUSSURE II MG1 PB IB1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/20/2021 | 5/31/2041 | R$39,496.84 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MUSSURE II | IB 230 kV MG 230 kV MUSSURE II MG1 PB IB1 | RB | FT MG 230 kV MUSSURE II MG1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,837.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | IB 230 kV MG 230 kV MUSSURE II MG1 PB IB1 | RB | FT MG 230 kV MUSSURE II MG1 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/26/2022 | 10/26/2042 | R$133,882.36 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MUSSURE II | EL 69 kV MUSSURE II VALENTINA 02J4 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/25/2021 | 6/7/2041 | R$46,070.04 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MUSSURE II | EL 69 kV MUSSURE II SANTA RITA-02J3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MUSSURE II | EL 69 kV MUSSURE II SANTA RITA-02J3 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/1/2020 | 2/7/2044 | R$83,383.11 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MUSSURE II | EL 69 kV MUSSURE II MUSSURE I-12J6 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MUSSURE II | EL 69 kV MUSSURE II MUSSURE I-12J6 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MUSSURE II | EL 69 kV MUSSURE II MUSSURE I-12J6 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/5/2021 | 3/7/2042 | R$53,835.47 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MUSSURE II | EL 69 kV MUSSURE II MANGABEIRA-02J8 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MUSSURE II | EL 69 kV MUSSURE II MANGABEIRA-02J8 | DIT | 061/2001 | IPCA | RCDM | REA 2376/2010 | 3/26/2015 | 3/28/2045 | R$11,449.75 | 6/1/2025 | Ativa | Substituição da seccionadora 32J8-6.Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | MUSSURE II | EL 69 kV MUSSURE II MANGABEIRA-02J8 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MUSSURE II | EL 69 kV MUSSURE II MANGABEIRA-02J8 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/24/2021 | 3/14/2045 | R$88,432.69 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MUSSURE II | EL 69 kV MUSSURE II J.PESSOA-02J1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MUSSURE II | EL 69 kV MUSSURE II J.PESSOA-02J1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/23/2021 | 4/29/2041 | R$44,313.44 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MUSSURE II | EL 69 kV MUSSURE II ILHA BISTO-02J7 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MUSSURE II | EL 69 kV MUSSURE II ILHA BISTO-02J7 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MUSSURE II | EL 69 kV MUSSURE II ILHA BISTO-02J7 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$189,606.68 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MUSSURE II | EL 69 kV MUSSURE II ILHA BISTO-02J7 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/21/2021 | 3/23/2042 | R$53,928.41 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MUSSURE II | EL 69 kV MUSSURE II CRISTO-02J2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MUSSURE II | EL 69 kV MUSSURE II CRISTO-02J2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/3/2021 | 4/9/2041 | R$44,217.74 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | MUSSURE II | EL 230 kV MUSSURE II LT 230 kV JOAO PESSOA II /MUSSURE II C-2 PB | RB | FT LT 230 kV JOAO PESSOA II /MUSSURE II C-2 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | EL 230 kV MUSSURE II LT 230 kV JOAO PESSOA II /MUSSURE II C-2 PB | RB | FT LT 230 kV JOAO PESSOA II /MUSSURE II C-2 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/9/2021 | 7/8/2050 | R$173,014.45 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MUSSURE II | EL 230 kV MUSSURE II LT 230 kV JOAO PESSOA II /MUSSURE II C-1 PB | RB | FT LT 230 kV JOAO PESSOA II /MUSSURE II C-1 PB | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | MUSSURE II | EL 230 kV MUSSURE II LT 230 kV JOAO PESSOA II /MUSSURE II C-1 PB | RB | FT LT 230 kV JOAO PESSOA II /MUSSURE II C-1 PB | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/28/2021 | 4/19/2044 | R$225,486.69 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | MUSSURE II | BC 69 kV 21,3 Mvar MUSSURE II BC1 PB | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$111,469.11 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MUSSURE II | BC 69 kV 21,3 Mvar MUSSURE II BC1 PB | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$312,801.15 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MUSSURE II | BC 69 kV 21,2 Mvar MUSSURE II BC2 PB | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$111,123.49 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MUSSURE II | BC 69 kV 21,2 Mvar MUSSURE II BC2 PB | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$311,831.30 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | MUSSURE II | BC 69 kV 21,2 Mvar MUSSURE II BC2 PB | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/7/2021 | 11/6/2049 | R$1,317.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Sul | N. PETROPOLIS 2 | TR 230/69 kV N. PETROPOLIS 2 TR2 RS | RBF | FT TR 230/69 kV N. PETROPOLIS 2 TR2 RS | 011/2010 | IPCA | RBNI | REA 6042/2016 | 9/22/2018 | 9/22/2052 | R$ 1,470,955.53 | 6/1/2025 | Ativa | T2016-058 | Instalar o 2º Transformador 230/69kV - 83 MVA, com comutador e terciário *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Sul | N. PETROPOLIS 2 | TR 230/69 kV N. PETROPOLIS 2 TR1 RS | RBF | FT TR 230/69 kV N. PETROPOLIS 2 TR1 RS | 011/2010 | IPCA | RBL | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$ 1,195,110.33 | 6/1/2025 | Ativa | T2010-078-C | Contrato de Concessão nº 011/2010SE Nova Petrópolis 2 230/69kV - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Sul | N. PETROPOLIS 2 | MG 230 kV N. PETROPOLIS 2 MG1 RS | RB | FT MG 230 kV N. PETROPOLIS 2 MG1 RS | 011/2010 | IPCA | RBL | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$ 1,442,734.28 | 6/1/2025 | Ativa | T2010-078-C | Contrato de Concessão nº 011/2010SE Nova Petrópolis 2 230/69kV - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Sul | N. PETROPOLIS 2 | MG 230 kV N. PETROPOLIS 2 MG1 RS | RB | FT MG 230 kV N. PETROPOLIS 2 MG1 RS | 011/2010 | IPCA | RBNI | REA 6042/2016 | 9/22/2018 | 9/22/2049 | R$202,949.36 | 6/1/2025 | Ativa | T2016-058 | Instalar um Módulo de Infraestrutura referente aos módulos de conexão. *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Sul | N. PETROPOLIS 2 | MC 69 kV TR 230/69 kV N. PETROPOLIS 2 TR2 RS | RBF | FT TR 230/69 kV N. PETROPOLIS 2 TR2 RS | 011/2010 | IPCA | RBNI | REA 6042/2016 | 9/22/2018 | 9/22/2040 | R$427,891.85 | 6/1/2025 | Ativa | T2016-058 | Instalação, na SE N. PETROPOLIS 2, de um módulo de conexão, em 69 kV, para o autotransformador TR 230/69 kV N. PETROPOLIS 2 TR 2 RS *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Sul | N. PETROPOLIS 2 | MC 69 kV TR 230/69 kV N. PETROPOLIS 2 TR1 RS | RBF | FT TR 230/69 kV N. PETROPOLIS 2 TR1 RS | 011/2010 | IPCA | RBL | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$193,330.29 | 6/1/2025 | Ativa | T2010-078-C | Contrato de Concessão nº 011/2010SE Nova Petrópolis 2 230/69kV - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Sul | N. PETROPOLIS 2 | MC 230 kV TR 230/69 kV N. PETROPOLIS 2 TR2 RS | RBF | FT TR 230/69 kV N. PETROPOLIS 2 TR2 RS | 011/2010 | IPCA | RBNI | REA 6042/2016 | 9/22/2018 | 9/22/2041 | R$ 1,124,473.84 | 6/1/2025 | Ativa | T2016-058 | Instalação, na SE N. PETROPOLIS 2, de um módulo de conexão, em 230 kV, para o autotransformador TR 230/69 kV N. PETROPOLIS 2 TR 2 RS *(Receita revisada em 21/06/2021) | ||
| AXIA Energia Sul | N. PETROPOLIS 2 | MC 230 kV TR 230/69 kV N. PETROPOLIS 2 TR1 RS | RBF | FT TR 230/69 kV N. PETROPOLIS 2 TR1 RS | 011/2010 | IPCA | RBL | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$486,117.01 | 6/1/2025 | Ativa | T2010-078-C | Contrato de Concessão nº 011/2010SE Nova Petrópolis 2 230/69kV - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Sul | N. PETROPOLIS 2 | IB 69 kV MG 230 kV N. PETROPOLIS 2 MG1 RS IB1 | DIT | 011/2010 | IPCA | RPEC | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$86,014.70 | 6/1/2025 | Ativa | T2010-078-C | Contrato de Concessão nº 011/2010SE Nova Petrópolis 2 230/69kV - RPEC *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Sul | N. PETROPOLIS 2 | IB 230 kV MG 230 kV N. PETROPOLIS 2 MG1 RS IB1 | RB | FT MG 230 kV N. PETROPOLIS 2 MG1 RS | 011/2010 | IPCA | RBL | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$358,853.77 | 6/1/2025 | Ativa | T2010-078-C | Contrato de Concessão nº 011/2010SE Nova Petrópolis 2 230/69kV - RBL *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | ||
| AXIA Energia Sul | N. PETROPOLIS 2 | EL 69 kV N. PETROPOLIS 2 DIST2 | DIT | 011/2010 | IPCA | RPEC | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$150,505.78 | 6/1/2025 | Ativa | T2010-078-C | Contrato de Concessão nº 011/2010SE Nova Petrópolis 2 230/69kV - RPEC *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Sul | N. PETROPOLIS 2 | EL 69 kV N. PETROPOLIS 2 DIST1 | DIT | 011/2010 | IPCA | RPEC | CC 011/2010 | 10/6/2010 | 10/6/2040 | R$150,505.78 | 6/1/2025 | Ativa | T2010-078-C | Contrato de Concessão nº 011/2010SE Nova Petrópolis 2 230/69kV - RPEC *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no reajuste do ciclo 2016-2017. *Receita revisada no Ciclo 2021-2022. | |||
| AXIA Energia Nordeste | N.S.SOCORRO | TT 69/0 kV N.S.SOCORRO TT1 SE | DIT | 005/2012 | IPCA | RPEC | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$193,029.55 | 6/1/2025 | Ativa | T2012-057-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | N.S.SOCORRO | TR 230/69 kV N.S.SOCORRO TR2 SE | RBF | FT TR 230/69 kV N.S.SOCORRO TR2 SE | 005/2012 | IPCA | RBL | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$ 1,652,977.42 | 6/1/2025 | Ativa | T2012-057-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | N.S.SOCORRO | TR 230/69 kV N.S.SOCORRO TR1 SE | RBF | FT TR 230/69 kV N.S.SOCORRO TR1 SE | 005/2012 | IPCA | RBL | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$ 1,652,977.42 | 6/1/2025 | Ativa | T2012-057-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | N.S.SOCORRO | MG 230 kV N.S.SOCORRO MG3 SE | RB | FT MG 230 kV N.S.SOCORRO MG3 SE | 005/2008 | IPCA | RBNI | DSP 1414/2022 | 5/9/2022 | 3/17/2038 | R$24,377.79 | 6/1/2025 | Ativa | Parcela adicional de RAP para Operação e Manutenção de 1 Módulo de Infraestrutura de Manobra 230 kV na SE Nossa Senhora do Socorro, associado à Entrada de Linha 230kV para a SE Penedo, em função do seccionamento da LT 230 kV Jardim – Penedo na SE Nossa Senhora do Socorro. *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Nordeste | N.S.SOCORRO | MG 230 kV N.S.SOCORRO MG2 SE | RB | FT MG 230 kV N.S.SOCORRO MG2 SE | 061/2001 | IPCA | RBNI | DSP 1080/2022 | 5/17/2021 | 12/31/2042 | R$10,595.61 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 230 kV na SE Nossa Senhora do Socorro, associado a Entrada de Linha 230kV para a SE FAFEN, em função do seccionamento da LT 230 kV Jardim - FAFEN. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | N.S.SOCORRO | MG 230 kV N.S.SOCORRO MG1 SE | RB | FT MG 230 kV N.S.SOCORRO MG1 SE | 005/2012 | IPCA | RBL | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$ 1,581,357.41 | 6/1/2025 | Ativa | T2012-057-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | N.S.SOCORRO | MG 230 kV N.S.SOCORRO MG1 SE | RB | FT MG 230 kV N.S.SOCORRO MG1 SE | 005/2012 | IPCA | RBNI | REN 905/2020 | 7/5/2020 | 7/4/2048 | R$43,074.76 | 6/1/2025 | Ativa | MIM associado a um módulo de entrada de linha 69kV, arranjo barra dupla, destino SE Siqueira Campos - 02N6 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Nordeste | N.S.SOCORRO | MC 69 kV TT 69/0 kV N.S.SOCORRO TT1 SE | DIT | 005/2012 | IPCA | RPEC | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$71,927.00 | 6/1/2025 | Ativa | T2012-057-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | N.S.SOCORRO | MC 69 kV TR 230/69 kV N.S.SOCORRO TR2 SE | RBF | FT TR 230/69 kV N.S.SOCORRO TR2 SE | 005/2012 | IPCA | RBL | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$213,465.96 | 6/1/2025 | Ativa | T2012-057-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | N.S.SOCORRO | MC 69 kV TR 230/69 kV N.S.SOCORRO TR1 SE | RBF | FT TR 230/69 kV N.S.SOCORRO TR1 SE | 005/2012 | IPCA | RBL | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$213,465.96 | 6/1/2025 | Ativa | T2012-057-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | N.S.SOCORRO | MC 230 kV TR 230/69 kV N.S.SOCORRO TR2 SE | RBF | FT TR 230/69 kV N.S.SOCORRO TR2 SE | 005/2012 | IPCA | RBL | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$524,439.49 | 6/1/2025 | Ativa | T2012-057-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | N.S.SOCORRO | MC 230 kV TR 230/69 kV N.S.SOCORRO TR1 SE | RBF | FT TR 230/69 kV N.S.SOCORRO TR1 SE | 005/2012 | IPCA | RBL | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$524,439.49 | 6/1/2025 | Ativa | T2012-057-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | N.S.SOCORRO | IB 69 kV MG 230 kV N.S.SOCORRO MG1 SE IB1 | DIT | 005/2012 | IPCA | RPEC | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$117,019.07 | 6/1/2025 | Ativa | T2012-057-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | N.S.SOCORRO | IB 230 kV MG 230 kV N.S.SOCORRO MG1 SE IB1 | RB | FT MG 230 kV N.S.SOCORRO MG1 SE | 005/2012 | IPCA | RBL | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$457,726.89 | 6/1/2025 | Ativa | T2012-057-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | N.S.SOCORRO | EL 69 kV N.S.SOCORRO DIST6 | DIT | 005/2012 | IPCA | RCDM | REN 905/2020 | 7/5/2020 | 7/4/2051 | R$552,467.91 | 6/1/2025 | Ativa | Instalar um módulo de entrada de linha 69kV, arranjo barra dupla, destino SE Siqueira Campos - 02N6 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 22/06/2022) | ||||
| AXIA Energia Nordeste | N.S.SOCORRO | EL 69 kV N.S.SOCORRO DIST5 | DIT | 005/2012 | IPCA | RPEC | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$199,203.83 | 6/1/2025 | Ativa | T2012-057-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | N.S.SOCORRO | EL 69 kV N.S.SOCORRO DIST4 | DIT | 005/2012 | IPCA | RPEC | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$199,203.83 | 6/1/2025 | Ativa | T2012-057-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | N.S.SOCORRO | EL 69 kV N.S.SOCORRO DIST3 | DIT | 005/2012 | IPCA | RPEC | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$199,203.83 | 6/1/2025 | Ativa | T2012-057-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | N.S.SOCORRO | EL 69 kV N.S.SOCORRO DIST2 | DIT | 005/2012 | IPCA | RPEC | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$199,203.83 | 6/1/2025 | Ativa | T2012-057-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | N.S.SOCORRO | EL 69 kV N.S.SOCORRO DIST1 | DIT | 005/2012 | IPCA | RPEC | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$199,203.83 | 6/1/2025 | Ativa | T2012-057-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Nordeste | N.S.SOCORRO | EL 230 kV N.S.SOCORRO LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL | RB | FT LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL | 005/2008 | IPCA | RBNI | DSP 1414/2022 | 5/9/2022 | 3/17/2038 | R$247,663.18 | 6/1/2025 | Ativa | Parcela adicional de RAP para Operação e Manutenção de Entrada de Linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Nossa Senhora do Socorro, associada à Linha de Transmissão 230 kV Senhora do Socorro - Penedo. *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Nordeste | N.S.SOCORRO | EL 230 kV N.S.SOCORRO LT 230 kV N.S.SOCORRO /JARDIM C-2 SE | RB | FT LT 230 kV N.S.SOCORRO /JARDIM C-2 SE | 005/2012 | IPCA | RBL | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$735,563.23 | 6/1/2025 | Ativa | T2012-057-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | N.S.SOCORRO | EL 230 kV N.S.SOCORRO LT 230 kV N.S.SOCORRO /JARDIM C-1 SE | RB | FT LT 230 kV N.S.SOCORRO /JARDIM C-1 SE | 005/2012 | IPCA | RBL | CC 005/2012 | 2/17/2019 | 5/10/2042 | R$735,563.23 | 6/1/2025 | Ativa | T2012-057-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | N.S.SOCORRO | EL 230 kV N.S.SOCORRO LT 230 kV N.S.SOCORRO /FAFEN C-1 SE | DIT | 061/2001 | IPCA | RCDM | DSP 1080/2022 | 5/17/2021 | 12/31/2042 | R$107,243.26 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Nossa Senhora do Socorro, associada à Linha de Transmissão 230 kV Jardim - FAFEN. *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | NATAL II | TT 69/13,8 kV NATAL II TA2 RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$88,456.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | TT 69/13,8 kV NATAL II TA2 RN | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$248,222.69 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | TT 69/13,8 kV NATAL II TA2 RN | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$228,831.00 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | TT 69/13,8 kV NATAL II TA1 RN | DIT | 061/2001 | IPCA | RCDM | REA 3578/2012 | 11/13/2015 | 7/11/2046 | R$181,741.26 | 6/1/2025 | Ativa | Obra de Substituição Completa - Substituição de 1 transformador de aterramento: 02A1. INCLUIDA NO CICLO 2016/2017 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | NATAL II | TR 69/3,3 kV NATAL II TRR1 RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | TR 69/3,3 kV NATAL II TR7 RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$95,434.32 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | TR 69/3,3 kV NATAL II TR7 RN | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$267,804.83 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | TR 69/3,3 kV NATAL II TR7 RN | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$246,883.34 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | TR 69/3,3 kV NATAL II TR6 RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$95,434.32 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | TR 69/3,3 kV NATAL II TR6 RN | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$267,804.83 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | TR 69/3,3 kV NATAL II TR6 RN | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$246,883.34 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | TR 69/13,8 kV NATAL II TR5 RN | RB | FT MG 230 kV NATAL II MG1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$27,249.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | TR 69/13,8 kV NATAL II TR5 RN | RB | FT MG 230 kV NATAL II MG1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$76,466.27 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | TR 69/13,8 kV NATAL II TR5 RN | RB | FT MG 230 kV NATAL II MG1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$70,492.55 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | TR 230/69 kV NATAL II TR8 RN | RBF | FT TR 230/69 kV NATAL II TR8 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | TR 230/69 kV NATAL II TR4 RN | RBF | FT TR 230/69 kV NATAL II TR4 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | TR 230/69 kV NATAL II TR4 RN | RBF | FT TR 230/69 kV NATAL II TR4 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | TR 230/69 kV NATAL II TR4 RN | RBF | FT TR 230/69 kV NATAL II TR4 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$913,997.96 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | TR 230/69 kV NATAL II TR4 RN | RBF | FT TR 230/69 kV NATAL II TR4 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/6/2020 | 12/14/2054 | R$11,526.75 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | TR 230/69 kV NATAL II TR3 RN | RBF | FT TR 230/69 kV NATAL II TR3 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | TR 230/69 kV NATAL II TR3 RN | RBF | FT TR 230/69 kV NATAL II TR3 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | TR 230/69 kV NATAL II TR3 RN | RBF | FT TR 230/69 kV NATAL II TR3 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/30/2017 | 6/7/2052 | R$38,449.52 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | TR 230/69 kV NATAL II TR2 RN | RBF | FT TR 230/69 kV NATAL II TR2 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | TR 230/69 kV NATAL II TR2 RN | RBF | FT TR 230/69 kV NATAL II TR2 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | TR 230/69 kV NATAL II TR2 RN | RBF | FT TR 230/69 kV NATAL II TR2 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/17/2021 | 8/25/2056 | R$85,173.61 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | TR 230/69 kV NATAL II TR1 RN | RBF | FT TR 230/69 kV NATAL II TR1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$353,311.72 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | TR 230/69 kV NATAL II TR1 RN | RBF | FT TR 230/69 kV NATAL II TR1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$991,452.39 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | TR 230/69 kV NATAL II TR1 RN | RBF | FT TR 230/69 kV NATAL II TR1 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/28/2020 | 11/6/2055 | R$136,669.97 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | RTL 230 kV 9,9 Mvar NATAL II RT3 RN | RB | FT RTL 230 kV 9,9 MVAr NATAL II RT3 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,989.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | RTL 230 kV 9,9 Mvar NATAL II RT3 RN | RB | FT RTL 230 kV 9,9 MVAr NATAL II RT3 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$454,570.72 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | RTL 230 kV 9,9 Mvar NATAL II RT3 RN | RB | FT RTL 230 kV 9,9 MVAr NATAL II RT3 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$419,058.66 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | RTL 230 kV 9,9 Mvar NATAL II RT3 RN | RB | FT RTL 230 kV 9,9 MVAr NATAL II RT3 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/17/2018 | 2/24/2054 | R$5,614.40 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | RTL 230 kV 9,9 Mvar NATAL II RT2 RN | RB | FT RTL 230 kV 9,9 MVAr NATAL II RT2 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,989.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | RTL 230 kV 9,9 Mvar NATAL II RT2 RN | RB | FT RTL 230 kV 9,9 MVAr NATAL II RT2 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$454,570.72 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | RTL 230 kV 9,9 Mvar NATAL II RT2 RN | RB | FT RTL 230 kV 9,9 MVAr NATAL II RT2 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/28/2018 | 6/7/2054 | R$5,584.22 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | RTB 230 kV 30 Mvar NATAL II RT1 RN | RB | FT RTB 230 kV 30 MVAr NATAL II RT1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$361,663.90 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | MG 230 kV NATAL II MG1 RN | RB | FT MG 230 kV NATAL II MG1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$691,373.52 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | MG 230 kV NATAL II MG1 RN | RB | FT MG 230 kV NATAL II MG1 RN | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/30/2013 | 9/29/2030 | R$2,187.57 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCOS DE BATERIAS -48Vcc. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | MG 230 kV NATAL II MG1 RN | RB | FT MG 230 kV NATAL II MG1 RN | 061/2001 | IPCA | RMEL | REN 643/2014 | 4/30/2015 | 4/29/2043 | R$42,488.85 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DO CONCENTRADOR DE DADOS PARA ATENDIMENTO AO AUMENTO DA OBSERVABILIDADE ASSOCIADA AO PROCEDIMENTO DE REDE 2.7..Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | MG 230 kV NATAL II MG1 RN | RB | FT MG 230 kV NATAL II MG1 RN | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/24/2015 | 7/23/2030 | R$160,340.14 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE SWITCH.Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | MG 230 kV NATAL II MG1 RN | RB | FT MG 230 kV NATAL II MG1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,940,110.91 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | MG 230 kV NATAL II MG1 RN | RB | FT MG 230 kV NATAL II MG1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,788,545.22 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | MG 230 kV NATAL II MG1 RN | RB | FT MG 230 kV NATAL II MG1 RN | 061/2001 | IPCA | RMEL | REN 443/2011 | 1/28/2016 | 1/27/2033 | R$7,355.92 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BATERIAS - 250Vcc * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | MG 230 kV NATAL II MG1 RN | RB | FT MG 230 kV NATAL II MG1 RN | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/5/2016 | 5/4/2031 | R$1,459.70 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | MG 230 kV NATAL II MG1 RN | RB | FT MG 230 kV NATAL II MG1 RN | 061/2001 | IPCA | RMEL | REN 443/2011 | 12/29/2016 | 12/28/2044 | R$65,890.66 | 6/1/2025 | Ativa | Implantação de Sistemas Automáticos de Regulação associados a transformadores. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | MG 230 kV NATAL II MG1 RN | RB | FT MG 230 kV NATAL II MG1 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/2/2019 | 12/19/2041 | R$250,071.39 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | MC 69 kV TT 69/13,8 kV NATAL II TA2 RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | MC 69 kV TT 69/13,8 kV NATAL II TA2 RN | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 5/5/2016 | 5/4/2031 | R$1,459.70 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | NATAL II | MC 69 kV TT 69/13,8 kV NATAL II TA1 RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$26,220.17 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | MC 69 kV TR 69/3,3 kV NATAL II TR7 RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$56,157.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | MC 69 kV TR 69/3,3 kV NATAL II TR7 RN | DIT | 061/2001 | IPCA | RCDM | REA 2376/2010 | 8/22/2013 | 12/29/2044 | R$27,176.49 | 6/1/2025 | Ativa | Substituição dos TCs 92T7-A/B/C. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | NATAL II | MC 69 kV TR 69/3,3 kV NATAL II TR7 RN | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/21/2018 | 9/20/2042 | R$7,132.72 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | NATAL II | MC 69 kV TR 69/3,3 kV NATAL II TR6 RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$56,157.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | MC 69 kV TR 69/3,3 kV NATAL II TR6 RN | DIT | 061/2001 | IPCA | RCDM | REA 2376/2010 | 9/2/2013 | 1/9/2045 | R$27,204.53 | 6/1/2025 | Ativa | Substituição dos TCs 92T6-A/B/C. Incluído no reajuste ciclo 2014-2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | NATAL II | MC 69 kV TR 69/3,3 kV NATAL II TR6 RN | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/29/2018 | 8/28/2042 | R$7,115.94 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | NATAL II | MC 69 kV TR 69/13,8 kV NATAL II TR5 RN | RB | FT MG 230 kV NATAL II MG1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | MC 69 kV TR 230/69 kV NATAL II TR8 RN | RBF | FT TR 230/69 kV NATAL II TR8 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | MC 69 kV TR 230/69 kV NATAL II TR4 RN | RBF | FT TR 230/69 kV NATAL II TR4 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | MC 69 kV TR 230/69 kV NATAL II TR4 RN | RBF | FT TR 230/69 kV NATAL II TR4 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$175,929.50 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | MC 69 kV TR 230/69 kV NATAL II TR4 RN | RBF | FT TR 230/69 kV NATAL II TR4 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/9/2018 | 3/5/2049 | R$23,031.94 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | MC 69 kV TR 230/69 kV NATAL II TR3 RN | RBF | FT TR 230/69 kV NATAL II TR3 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | MC 69 kV TR 230/69 kV NATAL II TR3 RN | RBF | FT TR 230/69 kV NATAL II TR3 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/11/2021 | 2/20/2050 | R$42,092.05 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | MC 69 kV TR 230/69 kV NATAL II TR2 RN | RBF | FT TR 230/69 kV NATAL II TR2 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | MC 69 kV TR 230/69 kV NATAL II TR2 RN | RBF | FT TR 230/69 kV NATAL II TR2 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/13/2019 | 9/14/2050 | R$158,885.98 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | MC 69 kV TR 230/69 kV NATAL II TR1 RN | RBF | FT TR 230/69 kV NATAL II TR1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$62,693.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | MC 69 kV TR 230/69 kV NATAL II TR1 RN | RBF | FT TR 230/69 kV NATAL II TR1 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/23/2020 | 7/9/2051 | R$155,541.85 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC4 RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC4 RN | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC3 RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC3 RN | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC3 RN | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/17/2018 | 8/19/2048 | R$30,989.81 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | NATAL II | MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC2 RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC2 RN | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC2 RN | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/18/2018 | 5/20/2048 | R$30,754.41 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | NATAL II | MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC1 RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$72,237.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC1 RN | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$202,709.64 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC1 RN | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/30/2018 | 6/1/2048 | R$30,785.47 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | NATAL II | MC 230 kV TR 230/69 kV NATAL II TR8 RN | RBF | FT TR 230/69 kV NATAL II TR8 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$137,964.55 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | MC 230 kV TR 230/69 kV NATAL II TR4 RN | RBF | FT TR 230/69 kV NATAL II TR4 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | MC 230 kV TR 230/69 kV NATAL II TR4 RN | RBF | FT TR 230/69 kV NATAL II TR4 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$410,719.67 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | MC 230 kV TR 230/69 kV NATAL II TR3 RN | RBF | FT TR 230/69 kV NATAL II TR3 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | MC 230 kV TR 230/69 kV NATAL II TR3 RN | RBF | FT TR 230/69 kV NATAL II TR3 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/7/2019 | 9/4/2048 | R$144,198.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | MC 230 kV TR 230/69 kV NATAL II TR2 RN | RBF | FT TR 230/69 kV NATAL II TR2 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | MC 230 kV TR 230/69 kV NATAL II TR2 RN | RBF | FT TR 230/69 kV NATAL II TR2 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 11/1/2018 | 1/4/2048 | R$199,904.84 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | MC 230 kV TR 230/69 kV NATAL II TR1 RN | RBF | FT TR 230/69 kV NATAL II TR1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$146,363.13 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | MC 230 kV TR 230/69 kV NATAL II TR1 RN | RBF | FT TR 230/69 kV NATAL II TR1 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/26/2018 | 12/29/2047 | R$199,799.34 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | MC 230 kV RTL 230 kV 9,9 Mvar NATAL II RT3 RN | RB | FT RTL 230 kV 9,9 MVAr NATAL II RT3 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$91,861.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | MC 230 kV RTL 230 kV 9,9 Mvar NATAL II RT3 RN | RB | FT RTL 230 kV 9,9 MVAr NATAL II RT3 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$257,778.53 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | MC 230 kV RTL 230 kV 9,9 Mvar NATAL II RT3 RN | RB | FT RTL 230 kV 9,9 MVAr NATAL II RT3 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/16/2019 | 5/18/2049 | R$39,534.43 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | MC 230 kV RTL 230 kV 9,9 Mvar NATAL II RT2 RN | RB | FT RTL 230 kV 9,9 MVAr NATAL II RT2 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$91,861.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | MC 230 kV RTL 230 kV 9,9 Mvar NATAL II RT2 RN | RB | FT RTL 230 kV 9,9 MVAr NATAL II RT2 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$257,778.53 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | MC 230 kV RTL 230 kV 9,9 Mvar NATAL II RT2 RN | RB | FT RTL 230 kV 9,9 MVAr NATAL II RT2 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 4/17/2019 | 4/19/2049 | R$39,440.86 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | MC 230 kV RTB 230 kV 30 Mvar NATAL II RT1 RN | RB | FT RTB 230 kV 30 MVAr NATAL II RT1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$140,466.92 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | MC 230 kV RTB 230 kV 30 Mvar NATAL II RT1 RN | RB | FT RTB 230 kV 30 MVAr NATAL II RT1 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/7/2019 | 6/9/2049 | R$ 766.78 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | IB 69 kV MG 230 kV NATAL II MG1 RN IB1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$42,137.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | IB 230 kV MG 230 kV NATAL II MG1 RN IB1 | RB | FT MG 230 kV NATAL II MG1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,837.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | IB 230 kV MG 230 kV NATAL II MG1 RN IB1 | RB | FT MG 230 kV NATAL II MG1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$325,059.40 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | IB 230 kV MG 230 kV NATAL II MG1 RN IB1 | RB | FT MG 230 kV NATAL II MG1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$299,665.05 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | IB 230 kV MG 230 kV NATAL II MG1 RN IB1 | RB | FT MG 230 kV NATAL II MG1 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/12/2022 | 12/11/2055 | R$1,394.80 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II RIBEIRA-02J3 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II RIBEIRA-02J3 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 12/18/2013 | 10/9/2046 | R$63,372.05 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras associadas ao Disjuntor 12J3. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II RIBEIRA-02J3 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/7/2018 | 4/11/2047 | R$38,061.19 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II PARNAMIRIM-02J8 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II PARNAMIRIM-02J8 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II PARNAMIRIM-02J8 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/10/2019 | 3/13/2048 | R$39,179.70 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II PARNAMIRIM-02J6 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II PARNAMIRIM-02J6 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 3/21/2014 | 1/10/2047 | R$63,893.91 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras associadas ao Disjuntor 12J6. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II NEOPOLIS-02J9 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II NEOPOLIS-02J9 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 3/21/2014 | 1/10/2047 | R$63,893.91 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras associadas ao Disjuntor 12J9. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II NEOPOLIS-02J9 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II NEOPOLIS-02J9 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/13/2018 | 6/17/2047 | R$38,283.50 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II NATAL I-02J1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II NATAL I-02J1 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/17/2020 | 6/2/2051 | R$155,101.44 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II IGAPO-02J7 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II IGAPO-02J7 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/2/2022 | 1/4/2051 | R$42,587.81 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II IGAPO-02J5 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II IGAPO-02J5 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 2/11/2014 | 12/3/2046 | R$63,681.08 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras associadas ao Disjuntor 12J5. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II IGAPO-02J5 | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$205,674.41 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II IGAPO-02J5 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/7/2022 | 2/9/2051 | R$42,705.52 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II IGAPO-02J4 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II IGAPO-02J4 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 1/27/2014 | 11/18/2046 | R$63,597.06 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras associadas ao Disjuntor 12J4. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II IGAPO-02J4 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/18/2022 | 11/20/2050 | R$42,438.35 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II CENTRO-12J2 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II CENTRO-12J2 | DIT | 061/2001 | IPCA | RCDM | REA 2040/2009 | 3/21/2014 | 1/10/2047 | R$63,893.91 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras associadas ao Disjuntor 12J2. RAP reconhecida no reajuste do ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II CENTRO-12J2 | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/24/2018 | 5/29/2047 | R$38,221.81 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | NATAL II | EL 69 kV NATAL II ALECRIM-02N1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$73,293.67 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | EL 230 kV NATAL II LT 230 kV PARAISO /NATAL II C-2 RN | RB | FT LT 230 kV PARAISO /NATAL II C-2 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | EL 230 kV NATAL II LT 230 kV PARAISO /NATAL II C-2 RN | RB | FT LT 230 kV PARAISO /NATAL II C-2 RN | 061/2001 | IPCA | RMEL | REN 443/2011 | 6/25/2017 | 12/21/2049 | R$40,672.18 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE CHAVE SUBCCIONADORA, POSIÇÃO 34N2-6 DA SUB NATAL II * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | EL 230 kV NATAL II LT 230 kV PARAISO /NATAL II C-2 RN | RB | FT LT 230 kV PARAISO /NATAL II C-2 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/9/2019 | 6/25/2049 | R$98,522.50 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | EL 230 kV NATAL II LT 230 kV PARAISO /NATAL II C-1 RN | RB | FT LT 230 kV PARAISO /NATAL II C-1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | EL 230 kV NATAL II LT 230 kV PARAISO /NATAL II C-1 RN | RB | FT LT 230 kV PARAISO /NATAL II C-1 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/23/2020 | 10/5/2049 | R$184,007.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | EL 230 kV NATAL II LT 230 kV NATAL III /NATAL II C-2 RN | RB | FT LT 230 kV NATAL III /NATAL II C-2 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | EL 230 kV NATAL II LT 230 kV NATAL III /NATAL II C-2 RN | RB | FT LT 230 kV NATAL III /NATAL II C-2 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/17/2019 | 6/16/2059 | R$1,556.70 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | EL 230 kV NATAL II LT 230 kV NATAL III /NATAL II C-2 RN | RB | FT LT 230 kV NATAL III /NATAL II C-2 RN | 061/2001 | IPCA | RBNI | REA 2040/2009 | 5/16/2019 | 5/18/2049 | R$100,122.08 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 230 kV associadas ao Disjuntor 14V3. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | EL 230 kV NATAL II LT 230 kV NATAL III /NATAL II C-1 RN | RB | FT LT 230 kV NATAL III /NATAL II C-1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$212,712.45 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | EL 230 kV NATAL II LT 230 kV NATAL III /NATAL II C-1 RN | RB | FT LT 230 kV NATAL III /NATAL II C-1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$596,907.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | EL 230 kV NATAL II LT 230 kV NATAL III /NATAL II C-1 RN | RB | FT LT 230 kV NATAL III /NATAL II C-1 RN | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$550,275.38 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | EL 230 kV NATAL II LT 230 kV NATAL III /NATAL II C-1 RN | RB | FT LT 230 kV NATAL III /NATAL II C-1 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/9/2021 | 5/30/2051 | R$58,366.92 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | EL 230 kV NATAL II LT 230 kV NATAL III /NATAL II C-1 RN | RB | FT LT 230 kV NATAL III /NATAL II C-1 RN | 061/2001 | IPCA | RBNI | REA 2040/2009 | 5/16/2019 | 5/18/2049 | R$136,365.11 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 230 kV associadas ao Disjuntor 14V3. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL II | EL 13,8 kV NATAL II AUXIL1 | RB | FT MG 230 kV NATAL II MG1 RN | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | NATAL II | CE 20/-0 Mvar NATAL II CE2 RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$531,720.90 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | CE 20/-0 Mvar NATAL II CE2 RN | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,492,098.70 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | CE 20/-0 Mvar NATAL II CE1 RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$531,720.90 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | CE 20/-0 Mvar NATAL II CE1 RN | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,492,098.70 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | CE 20/-0 Mvar NATAL II CE1 RN | DIT | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/24/2021 | 5/27/2051 | R$52,240.55 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Nordeste | NATAL II | BC 69 kV 21,3 Mvar NATAL II BC4 RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$111,469.11 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | BC 69 kV 21,3 Mvar NATAL II BC4 RN | DIT | 061/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$312,801.15 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | BC 69 kV 21,3 Mvar NATAL II BC3 RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$111,469.11 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | BC 69 kV 21,3 Mvar NATAL II BC2 RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$111,469.11 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL II | BC 69 kV 21,3 Mvar NATAL II BC1 RN | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$111,469.11 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | NATAL III | TT 69/0 kV NATAL III TT2 RN | DIT | 017/2009 | IPCA | RCDM | REA 4347/2013 | 9/26/2024 | 12/30/2054 | R$323,009.34 | 6/1/2025 | Ativa | Inclusão da 2a. unidade de impedância não superior a 10 Ohms/fase em paralelo com o reator de aterramento 02A1 existente. Obra reconhecida na Revisão da RAP. *(Receita revisada em 11/06/2025) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2025 - 2026 | ||||
| AXIA Energia Nordeste | NATAL III | TT 69/0 kV NATAL III TT1 RN | DIT | 017/2009 | IPCA | RPEC | CC 017/2009 | 8/3/2009 | 8/3/2039 | R$80,725.38 | 6/1/2025 | Ativa | T2009-225-C | Contrato de Concessão nº 017/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | |||
| AXIA Energia Nordeste | NATAL III | TR 230/69 kV NATAL III TR3 RN | RBF | FT TR 230/69 kV NATAL III TR3 RN | 017/2009 | IPCA | RBNI | REA 2823/2011 | 3/21/2018 | 1/10/2053 | R$ 1,386,890.62 | 6/1/2025 | Ativa | T2010-049 | Instalar, na SE Natal III, um transformador trifásico 230/69 kV, de 150 MVA. *(Receita revisada em 01/12/2020) *(Receita revisada em 11/06/2025) | ||
| AXIA Energia Nordeste | NATAL III | TR 230/69 kV NATAL III TR2 RN | RBF | FT TR 230/69 kV NATAL III TR2 RN | 017/2009 | IPCA | RBL | CC 017/2009 | 8/3/2009 | 8/3/2039 | R$ 2,393,251.62 | 6/1/2025 | Ativa | T2009-225-C | Contrato de Concessão nº 017/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Nordeste | NATAL III | TR 230/69 kV NATAL III TR1 RN | RBF | FT TR 230/69 kV NATAL III TR1 RN | 017/2009 | IPCA | RBL | CC 017/2009 | 8/3/2009 | 8/3/2039 | R$ 2,393,251.62 | 6/1/2025 | Ativa | T2009-225-C | Contrato de Concessão nº 017/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Nordeste | NATAL III | MG 230 kV NATAL III MG2 RN | RB | FT MG 230 kV NATAL III MG2 RN | 061/2001 | IPCA | RBNI | DSP 1073/2022 | 6/4/2021 | 12/31/2042 | R$42,382.47 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 4 módulo de infraestrutura de manobra 230 kV na SE Natal III, associados as entradas de linha 230kV para as SE´sCampina Grande II e Natal II, em função do seccionamento da LT 230 kV Campina Grande II - Natal II C1 e C2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | NATAL III | MG 230 kV NATAL III MG1 RN | RB | FT MG 230 kV NATAL III MG1 RN | 017/2009 | IPCA | RBL | CC 017/2009 | 8/3/2009 | 8/3/2039 | R$ 1,547,508.83 | 6/1/2025 | Ativa | T2009-225-C | Contrato de Concessão nº 017/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Nordeste | NATAL III | MG 230 kV NATAL III MG1 RN | RB | FT MG 230 kV NATAL III MG1 RN | 017/2009 | IPCA | RBNI | REA 2823/2011 | 3/21/2018 | 12/19/2044 | R$171,282.57 | 6/1/2025 | Ativa | T2010-049 | Complemento, na SE Natal III, de infraestrutura de módulo geral pela instalação do transformador trifásico 230/69 kV, de 150 MVA. *(Receita revisada em 01/12/2020) *(Receita revisada em 11/06/2025) | ||
| AXIA Energia Nordeste | NATAL III | MG 230 kV NATAL III MG1 RN | RB | FT MG 230 kV NATAL III MG1 RN | 017/2009 | IPCA | RMEL | REN 643/2014 | 2/7/2014 | 1/30/2029 | R$12,048.95 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE AMPLIFICADORES ÓPTICOS EM FINAL DE VIDA ÚTIL. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 01/12/2020) *(Receita revisada em 11/06/2025) | |||
| AXIA Energia Nordeste | NATAL III | MG 230 kV NATAL III MG1 RN | RB | FT MG 230 kV NATAL III MG1 RN | 017/2009 | IPCA | RMEL | REN 643/2014 | 2/28/2015 | 2/20/2030 | R$81,398.12 | 6/1/2025 | Ativa | IMPLANTAÇÃO DE ACESSO REMOTO A DISPOSITIVOS DE PROTEÇÃO. Melhoria incluída no ciclo 2016-2017. *(Receita revisada em 01/12/2020) *(Receita revisada em 11/06/2025) | |||
| AXIA Energia Nordeste | NATAL III | MG 230 kV NATAL III MG1 RN | RB | FT MG 230 kV NATAL III MG1 RN | 017/2009 | IPCA | RMEL | REN 443/2011 | 8/30/2016 | 8/27/2033 | R$37,734.19 | 6/1/2025 | Ativa | Implantação de Banco de Baterias * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 01/12/2020) *(Receita revisada em 11/06/2025) | |||
| AXIA Energia Nordeste | NATAL III | MC 69 kV TT 69/0 kV NATAL III TT2 RN | DIT | 017/2009 | IPCA | RCDM | REA 4347/2013 | 9/26/2024 | 12/28/2055 | R$342,524.47 | 6/1/2025 | Ativa | Inclusão do módulo de conexão 69kV referente a 2a. unidade de impedância não superior a 10 Ohms/fase em paralelo com o reator de aterramento 02A1 existente. Obra reconhecida na Revisão da RAP. *(Receita revisada em 11/06/2025) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2025 - 2026 | ||||
| AXIA Energia Nordeste | NATAL III | MC 69 kV TT 69/0 kV NATAL III TT1 RN | DIT | 017/2009 | IPCA | RPEC | CC 017/2009 | 8/3/2009 | 8/3/2039 | R$92,592.80 | 6/1/2025 | Ativa | T2009-225-C | Contrato de Concessão nº 017/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | |||
| AXIA Energia Nordeste | NATAL III | MC 69 kV TR 230/69 kV NATAL III TR3 RN | RBF | FT TR 230/69 kV NATAL III TR3 RN | 017/2009 | IPCA | RBNI | REA 2823/2011 | 3/21/2018 | 3/18/2048 | R$417,267.10 | 6/1/2025 | Ativa | T2010-049 | Instalar, na SE Natal III, um módulo de conexão 69 kV, arranjo barra principal e transferência, para o transformador trifásico 230/69 kV, de 150 MVA. *(Receita revisada em 01/12/2020) *(Receita revisada em 11/06/2025) | ||
| AXIA Energia Nordeste | NATAL III | MC 69 kV TR 230/69 kV NATAL III TR2 RN | RBF | FT TR 230/69 kV NATAL III TR2 RN | 017/2009 | IPCA | RBL | CC 017/2009 | 8/3/2009 | 8/3/2039 | R$228,836.91 | 6/1/2025 | Ativa | T2009-225-C | Contrato de Concessão nº 017/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Nordeste | NATAL III | MC 69 kV TR 230/69 kV NATAL III TR1 RN | RBF | FT TR 230/69 kV NATAL III TR1 RN | 017/2009 | IPCA | RBL | CC 017/2009 | 8/3/2009 | 8/3/2039 | R$228,836.91 | 6/1/2025 | Ativa | T2009-225-C | Contrato de Concessão nº 017/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Nordeste | NATAL III | MC 230 kV TR 230/69 kV NATAL III TR3 RN | RBF | FT TR 230/69 kV NATAL III TR3 RN | 017/2009 | IPCA | RBNI | REA 2823/2011 | 3/21/2018 | 2/25/2048 | R$969,878.55 | 6/1/2025 | Ativa | T2010-049 | Instalar, na SE Natal III, um módulo de conexão 230 kV, arranjo barra dupla a quatro chaves, para o transformador trifásico 230/69 kV, de 150 MVA. *(Receita revisada em 01/12/2020) *(Receita revisada em 11/06/2025) | ||
| AXIA Energia Nordeste | NATAL III | MC 230 kV TR 230/69 kV NATAL III TR2 RN | RBF | FT TR 230/69 kV NATAL III TR2 RN | 017/2009 | IPCA | RBL | CC 017/2009 | 8/3/2009 | 8/3/2039 | R$633,531.41 | 6/1/2025 | Ativa | T2009-225-C | Contrato de Concessão nº 017/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Nordeste | NATAL III | MC 230 kV TR 230/69 kV NATAL III TR1 RN | RBF | FT TR 230/69 kV NATAL III TR1 RN | 017/2009 | IPCA | RBL | CC 017/2009 | 8/3/2009 | 8/3/2039 | R$633,531.41 | 6/1/2025 | Ativa | T2009-225-C | Contrato de Concessão nº 017/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Nordeste | NATAL III | IB 69 kV MG 230 kV NATAL III MG1 RN IB1 | DIT | 017/2009 | IPCA | RPEC | CC 017/2009 | 8/3/2009 | 8/3/2039 | R$122,428.60 | 6/1/2025 | Ativa | T2009-225-C | Contrato de Concessão nº 017/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | |||
| AXIA Energia Nordeste | NATAL III | IB 230 kV MG 230 kV NATAL III MG1 RN IB1 | RB | FT MG 230 kV NATAL III MG1 RN | 017/2009 | IPCA | RBL | CC 017/2009 | 8/3/2009 | 8/3/2039 | R$514,171.93 | 6/1/2025 | Ativa | T2009-225-C | Contrato de Concessão nº 017/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia Nordeste | NATAL III | EL 69 kV NATAL III DIST4 | DIT | 017/2009 | IPCA | RPEC | CC 017/2009 | 8/3/2009 | 8/3/2039 | R$184,388.97 | 6/1/2025 | Ativa | T2009-225-C | Contrato de Concessão nº 017/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | |||
| AXIA Energia Nordeste | NATAL III | EL 69 kV NATAL III DIST3 | DIT | 017/2009 | IPCA | RPEC | CC 017/2009 | 8/3/2009 | 8/3/2039 | R$184,388.97 | 6/1/2025 | Ativa | T2009-225-C | Contrato de Concessão nº 017/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | |||
| AXIA Energia Nordeste | NATAL III | EL 69 kV NATAL III DIST2 | DIT | 017/2009 | IPCA | RPEC | CC 017/2009 | 8/3/2009 | 8/3/2039 | R$184,388.97 | 6/1/2025 | Ativa | T2009-225-C | Contrato de Concessão nº 017/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | |||
| AXIA Energia Nordeste | NATAL III | EL 69 kV NATAL III DIST1 | DIT | 017/2009 | IPCA | RPEC | CC 017/2009 | 8/3/2009 | 8/3/2039 | R$184,388.97 | 6/1/2025 | Ativa | T2009-225-C | Contrato de Concessão nº 017/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | |||
| AXIA Energia Nordeste | NATAL III | EL 230 kV NATAL III LT 230 kV NATAL III /NATAL II C-2 RN | RB | FT LT 230 kV NATAL III /NATAL II C-2 RN | 061/2001 | IPCA | RBNI | DSP 1073/2022 | 6/4/2021 | 12/31/2042 | R$107,243.26 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Natal III, associada à Linha de Transmissão 230 kV Natal III – Natal II C2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | NATAL III | EL 230 kV NATAL III LT 230 kV NATAL III /NATAL II C-2 RN | RB | FT LT 230 kV NATAL III /NATAL II C-2 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/20/2018 | 2/19/2033 | R$6,971.90 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL III | EL 230 kV NATAL III LT 230 kV NATAL III /NATAL II C-1 RN | RB | FT LT 230 kV NATAL III /NATAL II C-1 RN | 061/2001 | IPCA | RBNI | DSP 1073/2022 | 6/4/2021 | 12/31/2042 | R$107,243.26 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Natal III, associada à Linha de Transmissão 230 kV Natal III – Natal II C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | NATAL III | EL 230 kV NATAL III LT 230 kV NATAL III /NATAL II C-1 RN | RB | FT LT 230 kV NATAL III /NATAL II C-1 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/20/2018 | 2/19/2033 | R$6,971.90 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL III | EL 230 kV NATAL III LT 230 kV EXTREMOZ II /NATAL III C-2 RN | RB | FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN | 061/2001 | IPCA | RBNI | REA 3208/2011 | 1/6/2020 | 1/5/2035 | R$7,178.11 | 6/1/2025 | Ativa | T2011-151 | Adequar, na SE Natal III, o módulo de entrada de linha do circuito 2 da LT 230 kV Extremoz II / Natal III originado do seccionamento do 2 da LT 230 kV Campina II / Natal III. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | NATAL III | EL 230 kV NATAL III LT 230 kV EXTREMOZ II /NATAL III C-2 RN | RB | FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN | 061/2001 | IPCA | RBNI | DSP 1073/2022 | 6/4/2021 | 12/31/2042 | R$107,243.26 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Natal III, associada à Linha de Transmissão 230 kV Campina Grande II – Natal III C2. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | NATAL III | EL 230 kV NATAL III LT 230 kV EXTREMOZ II /NATAL III C-2 RN | RB | FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/28/2018 | 2/27/2033 | R$6,980.83 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | NATAL III | EL 230 kV NATAL III LT 230 kV EXTREMOZ II /NATAL III C-1 RN | RB | FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN | 061/2001 | IPCA | RBNI | DSP 1073/2022 | 6/4/2021 | 12/31/2042 | R$107,243.26 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Natal III, associada à Linha de Transmissão 230 kV Campina Grande II – Natal III C1. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | NATAL III | EL 230 kV NATAL III LT 230 kV EXTREMOZ II /NATAL III C-1 RN | RB | FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/20/2018 | 2/19/2033 | R$6,971.90 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | NIQUELANDIA | MG 230 kV NIQUELANDIA MG1 GO | RB | FT MG 230 kV NIQUELANDIA MG1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$398,203.07 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | NIQUELANDIA | MG 230 kV NIQUELANDIA MG1 GO | RB | FT MG 230 kV NIQUELANDIA MG1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,528,055.38 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | NIQUELANDIA | MG 230 kV NIQUELANDIA MG1 GO | RB | FT MG 230 kV NIQUELANDIA MG1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,638,157.17 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | NIQUELANDIA | MG 230 kV NIQUELANDIA MG1 GO | RB | FT MG 230 kV NIQUELANDIA MG1 GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 11/30/2017 | 12/25/2032 | R$15,603.21 | 6/1/2025 | Ativa | Implantação da infraestrutura de comunicação de voz e dados sem fio no pátio de manobra * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | NIQUELANDIA | MG 230 kV NIQUELANDIA MG1 GO | RB | FT MG 230 kV NIQUELANDIA MG1 GO | 062/2001 | IPCA | RMEL | REN 443/2011 | 12/8/2017 | 2/2/2033 | R$6,939.43 | 6/1/2025 | Ativa | Substituição de RÁDIO VHF ESTAÇÃO FIXA RÁDIO VHF ESTAÇÃO FIXA * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | NIQUELANDIA | MG 230 kV NIQUELANDIA MG1 GO | RB | FT MG 230 kV NIQUELANDIA MG1 GO | 062/2001 | IPCA | RMEL | REN 905/2020 | 3/9/2019 | 11/20/2035 | R$796,690.99 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | NIQUELANDIA | IB 230 kV MG 230 kV NIQUELANDIA MG1 GO IB1 | RB | FT MG 230 kV NIQUELANDIA MG1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$127,017.00 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | NIQUELANDIA | IB 230 kV MG 230 kV NIQUELANDIA MG1 GO IB1 | RB | FT MG 230 kV NIQUELANDIA MG1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$487,412.14 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | NIQUELANDIA | IB 230 kV MG 230 kV NIQUELANDIA MG1 GO IB1 | RB | FT MG 230 kV NIQUELANDIA MG1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$522,531.91 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | NIQUELANDIA | EL 230 kV NIQUELANDIA LT 230 kV S.DA MESA /NIQUELANDIA C-2 GO | RB | FT LT 230 kV S.DA MESA /NIQUELANDIA C-2 GO | 028/2009 | IPCA | RBL | CC 028/2009 | 9/27/2017 | 11/19/2039 | R$741,652.29 | 6/1/2025 | Ativa | T2009-241-A | Contrato de Concessão nº 028/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia | NIQUELANDIA | EL 230 kV NIQUELANDIA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO | RB | FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$208,406.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | NIQUELANDIA | EL 230 kV NIQUELANDIA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO | RB | FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$799,734.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | NIQUELANDIA | EL 230 kV NIQUELANDIA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO | RB | FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$857,358.19 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | NIQUELANDIA | EL 230 kV NIQUELANDIA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO | RB | FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO | 062/2001 | IPCA | RBNI | REA 3578/2012 | 4/22/2019 | 4/24/2049 | R$39,833.82 | 6/1/2025 | Ativa | Substituição de 1 seccionadora com lâminas de terra correspondente ao vão para Serra da Mesa do primeiro circuito da LT 230 kV Serra da Mesa - Niquelândia * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 – 2020 * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2019 - 2020 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | NIQUELANDIA | EL 230 kV NIQUELANDIA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO | RB | FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO | 062/2001 | IPCA | RMEL | REN 905/2020 | 1/30/2023 | 1/29/2038 | R$103,050.71 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia | NIQUELANDIA | EL 230 kV NIQUELANDIA LT 230 kV NIQUELANDIA /CODEMIN C-1 GO | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$208,406.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | NIQUELANDIA | EL 230 kV NIQUELANDIA LT 230 kV NIQUELANDIA /CODEMIN C-1 GO | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$799,734.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | NIQUELANDIA | EL 230 kV NIQUELANDIA LT 230 kV NIQUELANDIA /CODEMIN C-1 GO | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$857,358.19 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | NIQUELANDIA | EL 230 kV NIQUELANDIA LT 230 kV NIQUELANDIA /CODEMIN C-1 GO | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 5/6/2021 | 5/5/2036 | R$140,432.40 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia | NIQUELANDIA | EL 230 kV NIQUELANDIA LT 230 kV BARRO ALTO /NIQUELANDIA C-2 GO | RB | FT LT 230 kV BARRO ALTO /NIQUELANDIA C-2 GO | 028/2009 | IPCA | RBL | CC 028/2009 | 7/1/2016 | 11/19/2039 | R$709,523.62 | 6/1/2025 | Ativa | T2009-241-B | Contrato de Concessão nº 028/2009 *(Considera adicional de RGR relativo à prorrogação do encargo) * Receita Revisada no Ciclo 2015-2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 11-06-2025 | ||
| AXIA Energia | NIQUELANDIA | EL 230 kV NIQUELANDIA LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO | RB | FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$208,406.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | NIQUELANDIA | EL 230 kV NIQUELANDIA LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO | RB | FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$799,734.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | NIQUELANDIA | EL 230 kV NIQUELANDIA LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO | RB | FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$857,358.19 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | NIQUELANDIA | EL 230 kV NIQUELANDIA DIST1 | DIT | 062/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$208,406.54 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | NIQUELANDIA | EL 230 kV NIQUELANDIA DIST1 | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$799,734.49 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | NIQUELANDIA | EL 230 kV NIQUELANDIA DIST1 | DIT | 062/2001 | IPCA | RPC | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$857,358.19 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia | NIQUELANDIA | EL 230 kV NIQUELANDIA DIST1 | DIT | 062/2001 | IPCA | RMEL | REN 905/2020 | 11/11/2021 | 11/10/2036 | R$161,389.62 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | ||||
| AXIA Energia Norte | NOBRES | TR 230/138 kV NOBRES TR3 MT | RBF | FT TR 230/138 kV NOBRES TR3 MT | 058/2001 | IPCA | RBNIA | REA 15559/2024 | R$ 2,165,114.60 | 6/1/2025 | Prevista | T2024-154 | Instalar, na SE NOBRES, de uma transformação trifásica TR3 230/138-13,8 KV - 100 MVA. | ||||
| AXIA Energia Norte | NOBRES | TR 230/138 kV NOBRES TR2 MT | RBF | FT TR 230/138 kV NOBRES TR2 MT | 013/2011 | IPCA | RBL | CC 013/2011 | 10/8/2013 | 12/9/2041 | R$607,627.13 | 6/1/2025 | Ativa | T2012-035 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | NOBRES | TR 230/138 kV NOBRES TR1 MT | RBF | FT TR 230/138 kV NOBRES TR1 MT | 013/2011 | IPCA | RBL | CC 013/2011 | 10/8/2013 | 12/9/2041 | R$607,627.13 | 6/1/2025 | Ativa | T2012-035 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | NOBRES | MG 230 kV NOBRES MG2 MT | RB | FT MG 230 kV NOBRES MG2 MT | 013/2011 | IPCA | RBL | CC 013/2011 | 10/8/2013 | 12/9/2041 | R$535,998.32 | 6/1/2025 | Ativa | T2012-035 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | NOBRES | MG 230 kV NOBRES MG1 MT | RB | FT MG 230 kV NOBRES MG1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$453,321.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | NOBRES | MG 230 kV NOBRES MG1 MT | RB | FT MG 230 kV NOBRES MG1 MT | 058/2001 | IPCA | RBNIA | REA 15559/2024 | R$195,993.91 | 6/1/2025 | Prevista | T2024-154 | Módulo de Infraestrutura 230 kV associado à instalação do 3º Transformador de Potência Trifásico 230/138/13,8 kV de 100 MVA na SE Nobres | ||||
| AXIA Energia Norte | NOBRES | MG 230 kV NOBRES MG1 MT | RB | FT MG 230 kV NOBRES MG1 MT | 058/2001 | IPCA | RBNIA | REA 15559/2024 | R$125,369.05 | 6/1/2025 | Prevista | T2024-154 | Módulo de Infraestrutura 138 kV associado à instalação do 3º Transformador de Potência Trifásico 230/138/13,8 kV de 100 MVA na SE Nobres | ||||
| AXIA Energia Norte | NOBRES | MG 230 kV NOBRES MG1 MT | RB | FT MG 230 kV NOBRES MG1 MT | 058/2001 | IPCA | RMEL | REN 905/2020 | 11/23/2020 | 11/22/2037 | R$19,895.89 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | NOBRES | MC 230 kV TR 230/138 kV NOBRES TR3 MT | RBF | FT TR 230/138 kV NOBRES TR3 MT | 058/2001 | IPCA | RBNIA | REA 15559/2024 | R$ 1,638,159.05 | 6/1/2025 | Prevista | T2024-154 | Instalar, na SE NOBRES, um módulo de conexão, em 230 kV, para o transformador trifásico TR2 230/138 kV - 100 MVA, arranjo Barra Dupla a Quatro Chaves. | ||||
| AXIA Energia Norte | NOBRES | MC 230 kV TR 230/138 kV NOBRES TR2 MT | RBF | FT TR 230/138 kV NOBRES TR2 MT | 013/2011 | IPCA | RBL | CC 013/2011 | 10/8/2013 | 12/9/2041 | R$247,192.35 | 6/1/2025 | Ativa | T2012-035 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | NOBRES | MC 230 kV TR 230/138 kV NOBRES TR1 MT | RBF | FT TR 230/138 kV NOBRES TR1 MT | 013/2011 | IPCA | RBL | CC 013/2011 | 10/8/2013 | 12/9/2041 | R$247,192.35 | 6/1/2025 | Ativa | T2012-035 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | NOBRES | MC 138 kV TR 230/138 kV NOBRES TR3 MT | RBF | FT TR 230/138 kV NOBRES TR3 MT | 058/2001 | IPCA | RBNIA | REA 15559/2024 | R$ 1,232,038.84 | 6/1/2025 | Prevista | T2024-154 | Instalar, na SE NOBRES, um módulo de conexão, em 138 kV, para o transformador trifásico TR2 230/138 kV - 100 MVA, arranjo Barra Dupla a quatro chaves. | ||||
| AXIA Energia Norte | NOBRES | MC 138 kV TR 230/138 kV NOBRES TR2 MT | RBF | FT TR 230/138 kV NOBRES TR2 MT | 013/2011 | IPCA | RBL | CC 013/2011 | 10/8/2013 | 12/9/2041 | R$189,964.11 | 6/1/2025 | Ativa | T2012-035 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | NOBRES | MC 138 kV TR 230/138 kV NOBRES TR1 MT | RBF | FT TR 230/138 kV NOBRES TR1 MT | 013/2011 | IPCA | RBL | CC 013/2011 | 10/8/2013 | 12/9/2041 | R$189,964.11 | 6/1/2025 | Ativa | T2012-035 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Norte | NOBRES | IB 230 kV MG 230 kV NOBRES MG1 MT IB1 | RB | FT MG 230 kV NOBRES MG1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$158,618.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | NOBRES | IB 138 kV MG 230 kV NOBRES MG2 MT IB1 | DIT | 013/2011 | IPCA | RPEC | CC 013/2011 | 12/9/2011 | 12/9/2041 | R$151,992.65 | 6/1/2025 | Ativa | T2012-035 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia Norte | NOBRES | EL 230 kV NOBRES UHE MANSO | DIT | 058/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$253,523.26 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Norte | NOBRES | EL 230 kV NOBRES LT 230 kV NOBRES /NOVA MUTUM C-1 MT | RB | FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$260,258.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | NOBRES | EL 230 kV NOBRES LT 230 kV NOBRES /NOVA MUTUM C-1 MT | RB | FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$565,000.48 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | NOBRES | EL 230 kV NOBRES LT 230 kV COXIPO /NOBRES C-1 MT | RB | FT LT 230 kV COXIPO /NOBRES C-1 MT | 058/2001 | IPCA | RBNI | REA 2384/2010 | 12/20/2012 | 7/6/2039 | R$84,371.64 | 6/1/2025 | Ativa | T2009-145 | Adequaçao na subestação Nobres com a instalação de 3 TCs e duas bobinas de bloqueio no módulo de entrada de linha da LT 230 kV Coxipó - Nobres C1. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Norte | NOBRES | EL 230 kV NOBRES LT 230 kV COXIPO /NOBRES C-1 MT | RB | FT LT 230 kV COXIPO /NOBRES C-1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$260,258.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | NOBRES | EL 230 kV NOBRES LT 230 kV COXIPO /NOBRES C-1 MT | RB | FT LT 230 kV COXIPO /NOBRES C-1 MT | 058/2001 | IPCA | RMEL | REN 905/2020 | 3/15/2022 | 3/17/2052 | R$27,008.54 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | NOBRES | EL 230 kV NOBRES LT 230 kV COXIPO /NOBRES C-1 MT | RB | FT LT 230 kV COXIPO /NOBRES C-1 MT | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 12/22/2020 | 12/30/2036 | R$10,629.98 | 6/1/2025 | Ativa | MODERNIZAÇÃO -RELOGIO SINCRONIZADO POR SATELITE GPS, RT420NTP Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | NOBRES | EL 138 kV NOBRES DIST1 | DIT | 013/2011 | IPCA | RPEC | CC 013/2011 | 12/9/2011 | 12/9/2041 | R$293,997.19 | 6/1/2025 | Ativa | T2012-035 | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | |||
| AXIA Energia | NORDESTE | EL 345 kV NORDESTE LT 345 kV ITAPETI /NORDESTE C-1 SP | RB | FT LT 345 kV ITAPETI /NORDESTE C-1 SP | 007/2006 | IPCA | RBL | CC 007/2006 | 4/27/2006 | 4/27/2036 | R$ 2,494,587.67 | 6/1/2025 | Ativa | T2000-067 | Contrato de Concessão nº 007/2006 *(Considera adicional de RGR relativo à prorrogação do encargo) | ||
| AXIA Energia | NOVA IGUACU | MG 500 kV NOVA IGUACU MG3 RJ | RB | FT MG 500 kV NOVA IGUACU MG3 RJ | 062/2001 | IPCA | RBNI | DSP 836/2024 | 4/28/2023 | 4/27/2041 | R$75,085.60 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura Geral de Acessante -MIG-A 500 kV na SE Nova Iguaçu, em função do seccionamento da LT 500 kV Angra - São José C1. | |||
| AXIA Energia | NOVA IGUACU | MG 500 kV NOVA IGUACU MG3 RJ | RB | FT MG 500 kV NOVA IGUACU MG3 RJ | 062/2001 | IPCA | RBNI | DSP 836/2024 | 4/28/2023 | 4/27/2054 | R$86,334.83 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 500 kV na SE Nova Iguaçu, associado ao vão, arranjo Disjuntor e Meio, para a Interligação de Barras e Entradas de Linha 500 kV para as SEs Angra São José, em função do seccionamento da LT 500 kV Angra - São José na Subestação seccionadora Nova Iguaçu. | |||
| AXIA Energia | NOVA IGUACU | MG 500 kV NOVA IGUACU MG3 RJ | RB | FT MG 500 kV NOVA IGUACU MG3 RJ | 062/2001 | IPCA | RBNI | DSP 836/2024 | 4/28/2023 | 4/27/2054 | R$86,334.83 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Infraestrutura de Manobra 500 kV na SE Nova Iguaçu, associado ao vão, arranjo Disjuntor e Meio, para a Interligação de Barras e Entradas de Linha 500 kV para as SEs Grajaú e Zona Oeste, em função do seccionamento da LT 500 kV Grajaú - Zona Oeste na Subestação seccionadora Nova Iguaçu. | |||
| AXIA Energia | NOVA IGUACU | IB 500 kV MG 500 kV NOVA IGUACU MG3 RJ IB4 | RB | FT MG 500 kV NOVA IGUACU MG3 RJ | 062/2001 | IPCA | RBNI | DSP 836/2024 | 4/28/2023 | 4/27/2055 | R$288,305.28 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Interligação de Barras 500 kV na SE Nova Iguaçu, em função do seccionamento da LT 500 kV Grajaú - Zona Oeste C1. | |||
| AXIA Energia | NOVA IGUACU | IB 500 kV MG 500 kV NOVA IGUACU MG3 RJ IB3 | RB | FT MG 500 kV NOVA IGUACU MG3 RJ | 062/2001 | IPCA | RBNI | DSP 836/2024 | 4/28/2023 | 4/27/2055 | R$288,305.28 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de 1 Módulo de Interligação de Barras 500 kV na SE Nova Iguaçu, em função do seccionamento da LT 500 kV Angra - São José C1. | |||
| AXIA Energia | NOVA IGUACU | EL 500 kV NOVA IGUACU LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ | RB | FT LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ | 062/2001 | IPCA | RBNI | DSP 836/2024 | 4/28/2023 | 4/27/2051 | R$269,912.48 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV, arranjo Disjuntor e Meio, na subestação Nova Iguaçu, associada à Linha de Transmissão 500 kV Nova Iguaçu – Zona Oeste C1. | |||
| AXIA Energia | NOVA IGUACU | EL 500 kV NOVA IGUACU LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ | RB | FT LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ | 062/2001 | IPCA | RBNI | DSP 836/2024 | 4/28/2023 | 4/27/2051 | R$269,912.48 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV,arranjo Disjuntor e Meio, na subestação Nova Iguaçu, associada à Linha de Transmissão 500 kV Nova Iguaçu – São José C1. | |||
| AXIA Energia | NOVA IGUACU | EL 500 kV NOVA IGUACU LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ | RB | FT LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ | 062/2001 | IPCA | RBNI | DSP 836/2024 | 4/28/2023 | 4/27/2051 | R$269,912.48 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV, arranjo Disjuntor e Meio, na subestação Nova Iguaçu, associada à Linha de Transmissão 500 kV Grajaú – Nova Iguaçu C1. | |||
| AXIA Energia | NOVA IGUACU | EL 500 kV NOVA IGUACU LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ | RB | FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ | 062/2001 | IPCA | RBNI | DSP 836/2024 | 4/28/2023 | 4/27/2051 | R$269,912.48 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 500 kV,arranjo Disjuntor e Meio, na subestação Nova Iguaçu, associada à Linha de Transmissão 500 kV Angra – Nova Iguaçu C1. | |||
| AXIA Energia | NOVA IGUACU | EL 345 kV NOVA IGUACU LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ | RB | FT LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ | 062/2001 | IPCA | RBNI | DSP 836/2024 | 4/28/2023 | 4/27/2051 | R$217,523.18 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 345 kV,arranjo Disjuntor e Meio, na subestação Nova Iguaçu, associada à Linha de Transmissão 345 kV Nova Iguaçu – Jacarepaguá C1. | |||
| AXIA Energia | NOVA IGUACU | EL 345 kV NOVA IGUACU LT 345 kV ADRIANOPOLIS /NOVA IGUACU C-1 RJ | RB | FT LT 345 kV ADRIANOPOLIS /NOVA IGUACU C-1 RJ | 062/2001 | IPCA | RBNI | DSP 836/2024 | 4/28/2023 | 4/27/2051 | R$217,523.18 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de Entrada de Linha em 345 kV,arranjo Disjuntor e Meio, na subestação Nova Iguaçu, associada à Linha de Transmissão 345 kV Adrianópolis – Nova Iguaçu C1. | |||
| AXIA Energia Norte | NOVA MUTUM | TR 230/69 kV NOVA MUTUM TR4 MT | RBF | FT TR 230/69 kV NOVA MUTUM TR4 MT | 058/2001 | IPCA | RBNIA | DSP 073/2025 | R$ 2,096,175.68 | 6/1/2025 | Prevista | T2025-006 | Instalar, na SE NOVA MUTUM, de uma transformação trifásica TR4 230/69-13,8 KV - 75 MVA. | ||||
| AXIA Energia Norte | NOVA MUTUM | TR 230/69 kV NOVA MUTUM TF3 MT | RBF | FT TR 230/69 kV NOVA MUTUM TF3 MT | 058/2001 | IPCA | RBNI | REA 4347/2013 | 1/20/2017 | 2/6/2051 | R$131,422.54 | 6/1/2025 | Ativa | Instalação de um Transformador trifásico TR3 230/69/13,8 kV - 33 MVA transferido da SE Vila do Conde. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | NOVA MUTUM | TR 230/69 kV NOVA MUTUM TF3 MT | RBF | FT TR 230/69 kV NOVA MUTUM TF3 MT | 058/2001 | IPCA | RMEL | REN 905/2020 | 7/25/2017 | 7/24/2040 | R$10,209.26 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | NOVA MUTUM | TR 230/69 kV NOVA MUTUM TF2 MT | RBF | FT TR 230/69 kV NOVA MUTUM TF2 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$201,428.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | NOVA MUTUM | TR 230/69 kV NOVA MUTUM TF1 MT | RBF | FT TR 230/69 kV NOVA MUTUM TF1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$201,428.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | NOVA MUTUM | TR 230/69 kV NOVA MUTUM TF1 MT | RBF | FT TR 230/69 kV NOVA MUTUM TF1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$437,285.70 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | NOVA MUTUM | TR 230/69 kV NOVA MUTUM TF1 MT | RBF | FT TR 230/69 kV NOVA MUTUM TF1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$419,399.41 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | NOVA MUTUM | TR 230/69 kV NOVA MUTUM TF1 MT | RBF | FT TR 230/69 kV NOVA MUTUM TF1 MT | 058/2001 | IPCA | RBNIA | DSP 073/2025 | R$ 2,232,915.57 | 6/1/2025 | Prevista | T2025-007 | Obra de Substituição Completa: Substituição do Transformador Trifásico TF1, 230/69 kV, 30 MVA, por um Transformador 230/69 kV, 75 MVA. TR 230/69 kV NOVA MUTUM TF1 MT Adequação. | ||||
| AXIA Energia Norte | NOVA MUTUM | TR 230/69 kV NOVA MUTUM TF1 MT | RBF | FT TR 230/69 kV NOVA MUTUM TF1 MT | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 12/19/2016 | 12/18/2031 | R$22,749.78 | 6/1/2025 | Ativa | Implantacao de sistema de medicao e monitoramento online de Buchas Condensivas do equipamento NMTF601 para integrar ao SISTEMA DE SUPERVISAO SAGE Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | NOVA MUTUM | RTL 230 kV 20 Mvar NOVA MUTUM RT1 MT | RB | FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$344,016.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | NOVA MUTUM | RTL 230 kV 20 Mvar NOVA MUTUM RT1 MT | RB | FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$746,832.58 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | NOVA MUTUM | RTL 230 kV 20 Mvar NOVA MUTUM RT1 MT | RB | FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$716,284.90 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | NOVA MUTUM | MG 230 kV NOVA MUTUM MG1 MT | RB | FT MG 230 kV NOVA MUTUM MG1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$547,705.09 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | NOVA MUTUM | MG 230 kV NOVA MUTUM MG1 MT | RB | FT MG 230 kV NOVA MUTUM MG1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,189,025.97 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | NOVA MUTUM | MG 230 kV NOVA MUTUM MG1 MT | RB | FT MG 230 kV NOVA MUTUM MG1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 1,140,391.27 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | NOVA MUTUM | MG 230 kV NOVA MUTUM MG1 MT | RB | FT MG 230 kV NOVA MUTUM MG1 MT | 058/2001 | IPCA | RBNI | REA 4347/2013 | 1/20/2017 | 5/26/2046 | R$244,571.35 | 6/1/2025 | Ativa | Acréscimo de Módulo de infraestrutura geral referente à instalação de um módulo de conexão em 230 kV, conexão 69 kV e modulo do equipamento * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | NOVA MUTUM | MG 230 kV NOVA MUTUM MG1 MT | RB | FT MG 230 kV NOVA MUTUM MG1 MT | 058/2001 | IPCA | RBNIA | DSP 073/2025 | R$196,519.59 | 6/1/2025 | Prevista | T2025-006 | Módulo de infraestrutura em 230 kV associado ao TF4 230/69 kV, 75 MVA, na SE Nova Mutum. | ||||
| AXIA Energia Norte | NOVA MUTUM | MG 230 kV NOVA MUTUM MG1 MT | RB | FT MG 230 kV NOVA MUTUM MG1 MT | 058/2001 | IPCA | RBNIA | DSP 073/2025 | R$56,589.67 | 6/1/2025 | Prevista | T2025-006 | Módulo de infraestrutura em 69 kV associado ao TF4 230/69 kV, 75 MVA, na SE Nova Mutum. | ||||
| AXIA Energia Norte | NOVA MUTUM | MG 230 kV NOVA MUTUM MG1 MT | RB | FT MG 230 kV NOVA MUTUM MG1 MT | 058/2001 | IPCA | RBNI | DSP 1107/2021 | 8/7/2014 | 8/6/2039 | R$19,790.20 | 6/1/2025 | Ativa | INSSTALACAO SISTEMA DE DETECCAO E ALARME CONTRA INCENDIO INCLUINDO PAINEL DE CONTROLE MODNFS 320 23 Kv BATERIA 12 V PLACA DE INTERFACE SIRENE AUDIOVISUAL COM ACIONADOR MANUAL DETECTOR DE TEMPERATURA FIXA E TV LCD 42 Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | NOVA MUTUM | MC 69 kV TR 230/69 kV NOVA MUTUM TR4 MT | RBF | FT TR 230/69 kV NOVA MUTUM TR4 MT | 058/2001 | IPCA | RBNIA | DSP 073/2025 | R$588,725.43 | 6/1/2025 | Prevista | T2025-006 | Instalar, na SE NOVA MUTUM, um módulo de conexão, em 69 kV, para o transformador trifásico TR4 230/69 kV - 75 MVA, arranjo Barra Principal e Transferência. | ||||
| AXIA Energia Norte | NOVA MUTUM | MC 69 kV TR 230/69 kV NOVA MUTUM TF3 MT | RBF | FT TR 230/69 kV NOVA MUTUM TF3 MT | 058/2001 | IPCA | RBNI | REA 4347/2013 | 1/20/2017 | 8/9/2046 | R$379,786.31 | 6/1/2025 | Ativa | Instalação de um módulo de conexão de transformador em 69 kV, associado ao transformador trifásico TR3 230/69/13,8 kV - 33 MVA transferido da SE Vila do Conde. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | NOVA MUTUM | MC 69 kV TR 230/69 kV NOVA MUTUM TF2 MT | RBF | FT TR 230/69 kV NOVA MUTUM TF2 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$66,931.92 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | NOVA MUTUM | MC 69 kV TR 230/69 kV NOVA MUTUM TF1 MT | RBF | FT TR 230/69 kV NOVA MUTUM TF1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$66,931.92 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | NOVA MUTUM | MC 69 kV TR 230/69 kV NOVA MUTUM TF1 MT | RBF | FT TR 230/69 kV NOVA MUTUM TF1 MT | 058/2001 | IPCA | RBNIA | DSP 073/2025 | R$ 1,107,207.02 | 6/1/2025 | Prevista | T2025-007 | Obra de Substituição Completa: Módulo de Manobra 69 kV, BPT, para TF1 230/69 kV, 75 MVA, na SE Nova Mutum. MC 69 kV TR 230/69 kV NOVA MUTUM TF1 MT Adequação | ||||
| AXIA Energia Norte | NOVA MUTUM | MC 230 kV TR 230/69 kV NOVA MUTUM TR4 MT | RBF | FT TR 230/69 kV NOVA MUTUM TR4 MT | 058/2001 | IPCA | RBNIA | DSP 073/2025 | R$ 1,643,064.70 | 6/1/2025 | Prevista | T2025-006 | Instalar, na SE NOVA MUTUM, um módulo de conexão, em 230 kV, para o transformador trifásico TR4 230/69 kV - 75 MVA, arranjo Barra Dupla a Quatro Chaves. | ||||
| AXIA Energia Norte | NOVA MUTUM | MC 230 kV TR 230/69 kV NOVA MUTUM TF3 MT | RBF | FT TR 230/69 kV NOVA MUTUM TF3 MT | 058/2001 | IPCA | RBNI | REA 4347/2013 | 1/20/2017 | 9/18/2047 | R$ 1,044,429.57 | 6/1/2025 | Ativa | Instalação de um módulo de conexão de transformador em 230 kV, associado ao transformador trifásico TR3 230/69/13,8 kV - 33 MVA transferido da SE Vila do Conde. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | NOVA MUTUM | MC 230 kV TR 230/69 kV NOVA MUTUM TF3 MT | RBF | FT TR 230/69 kV NOVA MUTUM TF3 MT | 058/2001 | IPCA | RMEL | REN 905/2020 | 7/25/2017 | 7/28/2047 | R$70,197.58 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Norte | NOVA MUTUM | MC 230 kV TR 230/69 kV NOVA MUTUM TF2 MT | RBF | FT TR 230/69 kV NOVA MUTUM TF2 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$183,181.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | NOVA MUTUM | MC 230 kV TR 230/69 kV NOVA MUTUM TF1 MT | RBF | FT TR 230/69 kV NOVA MUTUM TF1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$183,181.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | NOVA MUTUM | MC 230 kV TR 230/69 kV NOVA MUTUM TF1 MT | RBF | FT TR 230/69 kV NOVA MUTUM TF1 MT | 058/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$397,673.32 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | NOVA MUTUM | MC 230 kV TR 230/69 kV NOVA MUTUM TF1 MT | RBF | FT TR 230/69 kV NOVA MUTUM TF1 MT | 058/2001 | IPCA | RBNIA | DSP 073/2025 | R$ 1,524,801.72 | 6/1/2025 | Prevista | T2025-007 | Obra de Substituição Completa: Módulo de Manobra 230 kV, BD4, para TF1 230/69 kV, 75 MVA, na SE Nova Mutum. MC 230 kV TR 230/69 kV NOVA MUTUM TF1 MT Adequação | ||||
| AXIA Energia Norte | NOVA MUTUM | MC 230 kV RTL 230 kV 20 Mvar NOVA MUTUM RT1 MT | RB | FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$109,485.81 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | NOVA MUTUM | IB 230 kV MG 230 kV NOVA MUTUM MG1 MT IB1 | RB | FT MG 230 kV NOVA MUTUM MG1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$158,618.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | NOVA MUTUM | EL 230 kV NOVA MUTUM LT 230 kV NOVA MUTUM /SORRISO C-1 MT | RB | FT LT 230 kV NOVA MUTUM /SORRISO C-1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$260,258.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | NOVA MUTUM | EL 230 kV NOVA MUTUM LT 230 kV NOBRES /NOVA MUTUM C-1 MT | RB | FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT | 058/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$260,258.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Norte | NOVA MUTUM PARANA | TR 230/69 kV NOVA MUTUM PARANA TR1 RO | RBF | FT TR 230/69 kV NOVA MUTUM PARANA TR1 RO | 058/2001 | IPCA | RBNI | REA 4661/2014 | 6/13/2019 | 12/31/2042 | R$68,976.24 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de transformador trifásico 230/69 kV, de 33 MVA, transferido sem ônus da Eletrosul para a Eletronorte. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | NOVA MUTUM PARANA | MG 230 kV NOVA MUTUM PARANA MG1 RO | RB | FT MG 230 kV NOVA MUTUM PARANA MG1 RO | 058/2001 | IPCA | RBNI | REA 4661/2014 | 6/13/2019 | 12/31/2042 | R$40,378.86 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de módulo de infraestrutura geral incompleto, na subestação em derivação da Linha de Transmissão 230 kV Porto Velho – Abunã C1, transferido sem ônus da ESBR para a Eletronorte; *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | NOVA MUTUM PARANA | MC 69 kV TR 230/69 kV NOVA MUTUM PARANA TR1 RO | RBF | FT TR 230/69 kV NOVA MUTUM PARANA TR1 RO | 058/2001 | IPCA | RBNI | REA 4661/2014 | 6/13/2019 | 12/31/2042 | R$26,290.17 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de módulo de conexão de transformador em 230 kV, arranjo barra simples, na subestação em derivação da Linha de Transmissão 230 kV Porto Velho – Abunã C1, transferido sem ônus da ESBR para a Eletronorte; *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Norte | NOVA MUTUM PARANA | MC 230 kV TR 230/69 kV NOVA MUTUM PARANA TR1 RO | RBF | FT TR 230/69 kV NOVA MUTUM PARANA TR1 RO | 058/2001 | IPCA | RBNI | REA 4661/2014 | 6/13/2019 | 12/31/2042 | R$72,405.61 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de módulo de conexão de transformador em 230 kV, arranjo barra simples, na subestação em derivação da Linha de Transmissão 230 kV Porto Velho – Abunã C1, transferido sem ônus da ESBR para a Eletronorte; *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | NOVA PRATA 2 | MG 230 kV NOVA PRATA 2 MG2 RS | RB | FT MG 230 kV NOVA PRATA 2 MG2 RS | 057/2001 | IPCA | RBNI | REA 3161/2011 | 9/25/2015 | 9/24/2041 | R$233,231.03 | 6/1/2025 | Ativa | T2011-133 | Módulo de infraestrutura geral para acessante. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | NOVA PRATA 2 | MG 230 kV NOVA PRATA 2 MG2 RS | RB | FT MG 230 kV NOVA PRATA 2 MG2 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 11/10/2022 | 11/9/2037 | R$31,333.72 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | NOVA PRATA 2 | EL 230 kV NOVA PRATA 2 LT 230 kV VILA MARIA /NOVA PRATA 2 C-2 RS | RB | FT LT 230 kV VILA MARIA /NOVA PRATA 2 C-2 RS | 057/2001 | IPCA | RBNI | REA 3161/2011 | 9/25/2015 | 9/24/2045 | R$ 1,076,542.51 | 6/1/2025 | Ativa | T2011-133 | Instalar, na SE NOVA PRATA 2, um módulo de entrada de linha em 230 kV, arranjo barra dupla a quatro chaves referente à linha de transmissão Passo Fundo – Nova Prata 2; Originado do seccionamento do circuito LT 230 kV MONTE CLARO /PASSO FUNDO C-1 RS na SE NOVA PRATA 2. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | NOVA PRATA 2 | EL 230 kV NOVA PRATA 2 LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS | RB | FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS | 057/2001 | IPCA | RBNI | REA 3161/2011 | 9/25/2015 | 9/24/2045 | R$ 1,076,542.51 | 6/1/2025 | Ativa | T2011-133 | Instalar, na SE NOVA PRATA 2, um módulo de entrada de linha em 230 kV, arranjo barra dupla a quatro chaves, referente à linha de transmissão Nova Prata 2 – Monte Claro; Originado do seccionamento do circuito LT 230 kV MONTE CLARO /PASSO FUNDO C-1 RS na SE NOVA PRATA 2. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | NOVA STA RITA | TR 525/230 kV NOVA STA RITA TRR1 RS | RB | FT TR 525/230 kV NOVA STA RITA TRR1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$558,003.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | NOVA STA RITA | TR 525/230 kV NOVA STA RITA TR4 RS | RB | FT TR 525/230 kV NOVA STA RITA TR4 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,674,009.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | NOVA STA RITA | TR 525/230 kV NOVA STA RITA TR3 RS | RB | FT TR 525/230 kV NOVA STA RITA TR3 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,674,009.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | NOVA STA RITA | TR 525/230 kV NOVA STA RITA TR2 RS | RB | FT TR 525/230 kV NOVA STA RITA TR2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,674,009.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | NOVA STA RITA | TR 525/230 kV NOVA STA RITA TR1 RS | RB | FT TR 525/230 kV NOVA STA RITA TR1 RS | 057/2001 | IPCA | RBNI | REA 3339/2012 | 12/22/2013 | 3/19/2049 | R$ 4,905,310.46 | 6/1/2025 | Ativa | T2012-003 | Instalação do quarto banco de autotransformadores monofásicos, 525/230 kV, 3 X 224 MVA; *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | NOVA STA RITA | RTL 525 kV 50 Mvar NOVA STA RITA RTR3 RS | RB | FT RTL 525 kV 50 Mvar NOVA STA RITA RTR3 RS | 004/2012 | IPCA | RBL | CC 004/2012 | 8/6/2014 | 5/10/2042 | R$694,328.02 | 6/1/2025 | Ativa | T2012-074-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Sul | NOVA STA RITA | RTL 525 kV 50 Mvar NOVA STA RITA RTR2 RS | RB | FT RTL 525 kV 50 Mvar NOVA STA RITA RTR2 RS | 005/2006 | IPCA | RBL | CC 005/2006 | 4/27/2006 | 4/27/2036 | R$446,647.88 | 6/1/2025 | Ativa | Contrato de Concessão nº 005/2006 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | NOVA STA RITA | RTL 525 kV 150 Mvar NOVA STA RITA RT3 RS | RB | FT RTL 525 kV 150 Mvar NOVA STA RITA RT3 RS | 004/2012 | IPCA | RBL | CC 004/2012 | 8/6/2014 | 5/10/2042 | R$ 2,082,982.30 | 6/1/2025 | Ativa | T2012-074-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Sul | NOVA STA RITA | RTL 525 kV 150 Mvar NOVA STA RITA RT2 RS | RB | FT RTL 525 kV 150 Mvar NOVA STA RITA RT2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$669,604.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | NOVA STA RITA | RTL 525 kV 150 Mvar NOVA STA RITA RT1 RS | RB | FT RTL 525 kV 150 Mvar NOVA STA RITA RT1 RS | 005/2006 | IPCA | RBL | CC 005/2006 | 4/27/2006 | 4/27/2036 | R$ 1,339,945.24 | 6/1/2025 | Ativa | Contrato de Concessão nº 005/2006 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | NOVA STA RITA | RTL 525 kV 150 Mvar NOVA STA RITA RT1 RS | RB | FT RTL 525 kV 150 Mvar NOVA STA RITA RT1 RS | 005/2006 | IPCA | RMEL | REN 443/2011 | 6/14/2017 | 6/12/2053 | R$ 807.90 | 6/1/2025 | Ativa | Substituição das flexitestes dos circuitos Gravataí, Itá, Campos Novos, TF1, TF2, TF3, TF4, RE1, RE2 e TIE * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 * Receita alterada no recurso contra a REH 2.407/2018. *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Sul | NOVA STA RITA | MG 525 kV NOVA STA RITA MG1 RS | RB | FT MG 525 kV NOVA STA RITA MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,497,170.62 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | NOVA STA RITA | MG 525 kV NOVA STA RITA MG1 RS | RB | FT MG 525 kV NOVA STA RITA MG1 RS | 057/2001 | IPCA | RMEL | REN 643/2014 | 10/5/2014 | 10/4/2031 | R$9,256.45 | 6/1/2025 | Ativa | Substituição de 2 baterias 125 Vcc. Bateria: BA4300141 e BA4300142 Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | NOVA STA RITA | MG 525 kV NOVA STA RITA MG1 RS | RB | FT MG 525 kV NOVA STA RITA MG1 RS | 057/2001 | IPCA | RMEL | REN 643/2014 | 6/15/2014 | 6/14/2031 | R$8,749.22 | 6/1/2025 | Ativa | Substituição de 2 baterias 48 Vcc. Melhoria incluída no reajuste ciclo 2016-2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | NOVA STA RITA | MG 525 kV NOVA STA RITA MG1 RS | RB | FT MG 525 kV NOVA STA RITA MG1 RS | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2034 | R$25,548.93 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Gravataí, Campos Novos e Itá. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | NOVA STA RITA | MG 525 kV NOVA STA RITA MG1 RS | RB | FT MG 525 kV NOVA STA RITA MG1 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 7/6/2020 | 5/16/2036 | R$21,632.70 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | NOVA STA RITA | MG 525 kV NOVA STA RITA MG1 RS | RB | FT MG 525 kV NOVA STA RITA MG1 RS | 057/2001 | IPCA | RBNI | DSP 4033/2021 | 4/16/2020 | 4/15/2035 | R$18,433.92 | 6/1/2025 | Ativa | Instalação de equipamento com função PMU (solução distribuída), especificamente o Módulo Concentrador de Informações, associado ao Módulo Geral da SE Nova Santa Rita.. Implantação do projeto de medição fasorial do SIN. Complementação da descrição da obra contida na REA 6.630/2017 (SGPMR - 000303/2014 SGPMI - 000479/2014). Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | NOVA STA RITA | MC 525 kV TR 525/230 kV NOVA STA RITA TR4 RS | RB | FT TR 525/230 kV NOVA STA RITA TR4 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$358,630.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | NOVA STA RITA | MC 525 kV TR 525/230 kV NOVA STA RITA TR3 RS | RB | FT TR 525/230 kV NOVA STA RITA TR3 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$358,630.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | NOVA STA RITA | MC 525 kV TR 525/230 kV NOVA STA RITA TR2 RS | RB | FT TR 525/230 kV NOVA STA RITA TR2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$358,630.05 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | NOVA STA RITA | MC 525 kV TR 525/230 kV NOVA STA RITA TR1 RS | RB | FT TR 525/230 kV NOVA STA RITA TR1 RS | 057/2001 | IPCA | RBNI | REA 3339/2012 | 12/22/2013 | 1/19/2045 | R$ 1,487,418.05 | 6/1/2025 | Ativa | T2012-003 | Instalação de um módulo de conexão de transformador, 525 kV, arranjo disjuntor e meio, referente ao quarto banco de autotransformadores monofásicos, 525/230 kV, 3 X 224 MVA; *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | NOVA STA RITA | MC 525 kV RTL 525 kV 150 Mvar NOVA STA RITA RT3 RS | RB | FT RTL 525 kV 150 Mvar NOVA STA RITA RT3 RS | 004/2012 | IPCA | RBL | CC 004/2012 | 8/6/2014 | 5/10/2042 | R$672,656.98 | 6/1/2025 | Ativa | T2012-074-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Sul | NOVA STA RITA | MC 525 kV RTL 525 kV 150 Mvar NOVA STA RITA RT2 RS | RB | FT RTL 525 kV 150 Mvar NOVA STA RITA RT2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$217,273.84 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | NOVA STA RITA | MC 525 kV RTL 525 kV 150 Mvar NOVA STA RITA RT1 RS | RB | FT RTL 525 kV 150 Mvar NOVA STA RITA RT1 RS | 005/2006 | IPCA | RBL | CC 005/2006 | 4/27/2006 | 4/27/2036 | R$879,372.96 | 6/1/2025 | Ativa | Contrato de Concessão nº 005/2006 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | NOVA STA RITA | MC 230 kV TR 525/230 kV NOVA STA RITA TR4 RS | RB | FT TR 525/230 kV NOVA STA RITA TR4 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | NOVA STA RITA | MC 230 kV TR 525/230 kV NOVA STA RITA TR3 RS | RB | FT TR 525/230 kV NOVA STA RITA TR3 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | NOVA STA RITA | MC 230 kV TR 525/230 kV NOVA STA RITA TR2 RS | RB | FT TR 525/230 kV NOVA STA RITA TR2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$132,977.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | NOVA STA RITA | MC 230 kV TR 525/230 kV NOVA STA RITA TR2 RS | RB | FT TR 525/230 kV NOVA STA RITA TR2 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 1/28/2023 | 1/30/2053 | R$53,506.20 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | NOVA STA RITA | MC 230 kV TR 525/230 kV NOVA STA RITA TR1 RS | RB | FT TR 525/230 kV NOVA STA RITA TR1 RS | 057/2001 | IPCA | RBNI | REA 3339/2012 | 12/22/2013 | 10/7/2044 | R$925,233.96 | 6/1/2025 | Ativa | T2012-003 | Instalação de um módulo de conexão de transformador, 230 kV, arranjo barra dupla a quatro chaves, referente ao quarto banco de autotransformadores monofásicos, 525/230 kV, 3 X 224 MVA. *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | NOVA STA RITA | IB 525 kV MG 525 kV NOVA STA RITA MG2 RS IB7 | RB | FT MG 525 kV NOVA STA RITA MG2 RS | 020/2012 | IPCA | RBL | CC 020/2012 | 3/24/2015 | 8/27/2042 | R$ 1,330,908.26 | 6/1/2025 | Ativa | T2012-080-B | Contrato de Concessão nº020/2012 - RB * Receita revisada no reajuste da RAP do ciclo 2018-2019. * Receita revisada em 07-11-2023 | ||
| AXIA Energia Sul | NOVA STA RITA | IB 525 kV MG 525 kV NOVA STA RITA MG1 RS IB6 | RB | FT MG 525 kV NOVA STA RITA MG1 RS | 057/2001 | IPCA | RBNI | REA 3339/2012 | 12/22/2013 | 9/23/2045 | R$ 1,395,084.33 | 6/1/2025 | Ativa | T2012-003 | Instalação de um módulo de interligação de barramentos, 525 kV, arranjo disjuntor e meio, complementando o vão de conexão do quarto banco de autotransformadores monofásicos, 525/230 kV, 3 X 224 MVA; *(Inclui alterações estabelecidas pela Lei 12.783/2013) *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Sul | NOVA STA RITA | IB 525 kV MG 525 kV NOVA STA RITA MG1 RS IB4 | RB | FT MG 525 kV NOVA STA RITA MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | NOVA STA RITA | IB 525 kV MG 525 kV NOVA STA RITA MG1 RS IB3 | RB | FT MG 525 kV NOVA STA RITA MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | NOVA STA RITA | IB 525 kV MG 525 kV NOVA STA RITA MG1 RS IB2 | RB | FT MG 525 kV NOVA STA RITA MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | NOVA STA RITA | IB 525 kV MG 525 kV NOVA STA RITA MG1 RS IB1 | RB | FT MG 525 kV NOVA STA RITA MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$380,583.14 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | NOVA STA RITA | IB 230 kV MG 525 kV NOVA STA RITA MG1 RS IB5 | RB | FT MG 525 kV NOVA STA RITA MG1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$115,146.18 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | NOVA STA RITA | EL 525 kV NOVA STA RITA LT 525 kV NOVA STA RITA /GUAIBA 3 C-1 RS | RB | FT LT 525 kV NOVA STA RITA /GUAIBA 3 C-1 RS | 020/2012 | IPCA | RBL | CC 020/2012 | 3/24/2015 | 8/27/2042 | R$ 1,413,681.00 | 6/1/2025 | Ativa | T2012-080-B | Contrato de Concessão nº020/2012 - RB * Receita revisada no reajuste da RAP do ciclo 2018-2019. * Receita revisada em 07-11-2023 | ||
| AXIA Energia Sul | NOVA STA RITA | EL 525 kV NOVA STA RITA LT 525 kV ITA /NOVA STA RITA C-2 SC/RS | RB | FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS | 004/2012 | IPCA | RBL | CC 004/2012 | 8/6/2014 | 5/10/2042 | R$ 1,257,469.74 | 6/1/2025 | Ativa | T2012-074-A | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Sul | NOVA STA RITA | EL 525 kV NOVA STA RITA LT 525 kV ITA /NOVA STA RITA C-2 SC/RS | RB | FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS | 004/2012 | IPCA | RBNI | REA 5861/2016 | 4/26/2020 | 4/25/2034 | R$32,376.36 | 6/1/2025 | Ativa | Implantação de Unidade de Medição Fasorial – PMU nos bays das LT 525 kV Ita / Nova Santa RIta C-2. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Sul | NOVA STA RITA | EL 525 kV NOVA STA RITA LT 525 kV ITA /NOVA STA RITA C-2 SC/RS | RB | FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS | 004/2012 | IPCA | RBNI | REA 8314/2019 | 4/26/2020 | 4/25/2034 | R$32,376.36 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU para transmissão das medidas para o ONS, nos bays das LT 525 kV Ita / Nova Santa RIta C-2. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 22/06/2022) | |||
| AXIA Energia Sul | NOVA STA RITA | EL 525 kV NOVA STA RITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS | RB | FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | NOVA STA RITA | EL 525 kV NOVA STA RITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS | RB | FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2034 | R$3,993.27 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Gravataí, Campos Novos e Itá. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | NOVA STA RITA | EL 525 kV NOVA STA RITA LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS | RB | FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$406,337.08 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | NOVA STA RITA | EL 525 kV NOVA STA RITA LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS | RB | FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/30/2034 | R$12,141.94 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Gravataí, Campos Novos e Itá. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | NOVA STA RITA | EL 525 kV NOVA STA RITA LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS | RB | FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS | 005/2006 | IPCA | RBL | CC 005/2006 | 4/27/2006 | 4/27/2036 | R$ 1,076,763.58 | 6/1/2025 | Ativa | Contrato de Concessão nº 005/2006 *(Considera adicional de RGR relativo à prorrogação do encargo) | |||
| AXIA Energia Sul | NOVA STA RITA | EL 525 kV NOVA STA RITA LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS | RB | FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS | 005/2006 | IPCA | RMEL | REN 443/2011 | 8/30/2015 | 8/28/2042 | R$ 672.18 | 6/1/2025 | Ativa | Substituição das flexitestes dos circuitos Gravataí, Itá, Campos Novos, TF1, TF2, TF3, TF4, RE1, RE2 e TIE * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2018 - 2019 * Receita alterada no recurso contra a REH 2.407/2018. *(Receita revisada em 06/07/2020) *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Sul | NOVA STA RITA | EL 525 kV NOVA STA RITA LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS | RB | FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS | 005/2006 | IPCA | RBNI | REA 5861/2016 | 5/31/2019 | 5/23/2034 | R$5,031.82 | 6/1/2025 | Ativa | Instalação de equipamentos com função PMU e toda infraestrutura necessária para envio de fasores de tensão e corrente dos circuitos Gravataí, Campos Novos e Itá. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2020 - 2021 *(Receita revisada em 27/06/2024) | |||
| AXIA Energia Sul | NOVA STA RITA | EL 230 kV NOVA STA RITA LT 230 kV CAMAQUA 3 /NOVA STA RITA C-1 RS | RB | FT LT 230 kV CAMAQUA 3 /NOVA STA RITA C-1 RS | 004/2012 | IPCA | RBL | CC 004/2012 | 12/9/2014 | 5/10/2042 | R$582,647.23 | 6/1/2025 | Ativa | T2012-074-B | *Receita revisada no reajuste do ciclo 2017-2018. * Receita revisada em 23-06-2022 | ||
| AXIA Energia Nordeste | OLINDINA | TR 230/13,8 kV OLINDINA TR1 BA | RBF | FT TR 230/13,8 kV OLINDINA TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$213,042.87 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OLINDINA | RTN 69 kV 0 Mvar OLINDINA RTN2 BA | RB | FT LT 500 kV JEREMOABO /OLINDINA C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$13,798.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OLINDINA | RTN 69 kV 0 Mvar OLINDINA RTN1 BA | RB | FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$13,798.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| Nova Era Integração | OLINDINA | RTL 500 kV 50 Mvar OLINDINA RTR5 BA | RB | FT RTL 500 kV 50 Mvar OLINDINA RTR5 BA | 008/2024 | IPCA | RBL | CC 008/2024 | R$470,710.83 | 6/1/2025 | Prevista | T2024-197-A | LT 500 kV Zebu III - Olindina C1 | ||||
| AXIA Energia Nordeste | OLINDINA | RTL 500 kV 50 Mvar OLINDINA RTR1 BA | RB | FT RTL 500 kV 50 Mvar OLINDINA RTR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$257,975.01 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OLINDINA | RTL 500 kV 50 Mvar OLINDINA RTR1 BA | RB | FT RTL 500 kV 50 Mvar OLINDINA RTR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$723,921.48 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OLINDINA | RTL 500 kV 50 Mvar OLINDINA RTR1 BA | RB | FT RTL 500 kV 50 Mvar OLINDINA RTR1 BA | 061/2001 | IPCA | RMELP | REA 14107/2023 | R$925,027.34 | 6/1/2025 | Prevista | T2023-058 | Obra de Substituição Completa - Substituição de 1 (um) Reator monofásico, potência 50 MVAr, posição operacional 05ER, da Subestação OLD. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 0001435/2022 | ||||
| AXIA Energia Nordeste | OLINDINA | RTL 500 kV 50 Mvar OLINDINA RTR1 BA | RB | FT RTL 500 kV 50 Mvar OLINDINA RTR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/24/2021 | 5/23/2045 | R$17,868.89 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| Nova Era Integração | OLINDINA | RTL 500 kV 150 Mvar OLINDINA RT8 BA | RB | FT LT 500 kV ZEBU III /OLINDINA C-1 AL/BA | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,412,132.48 | 6/1/2025 | Prevista | T2024-197-A | LT 500 kV Zebu III - Olindina C1 | ||||
| AXIA Energia Nordeste | OLINDINA | RTL 500 kV 150 Mvar OLINDINA RT2 BA | RB | FT LT 500 kV JEREMOABO /OLINDINA C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$773,925.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OLINDINA | RTL 500 kV 150 Mvar OLINDINA RT2 BA | RB | FT LT 500 kV JEREMOABO /OLINDINA C-1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,171,764.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OLINDINA | RTL 500 kV 150 Mvar OLINDINA RT1 BA | RB | FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$773,925.04 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OLINDINA | RTL 500 kV 150 Mvar OLINDINA RT1 BA | RB | FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 2,171,764.43 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OLINDINA | RTL 500 kV 150 Mvar OLINDINA RT1 BA | RB | FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE | 061/2001 | IPCA | RMELP | REA 14107/2023 | R$ 2,775,082.03 | 6/1/2025 | Prevista | T2023-059 | Obra de Substituição Completa - Substituição de 3 (três) Reatores monofásicos, fases A, B e C, potência 50 MVAr cada, posição operacional 05E1, da Subestação OLD. As desativações associadas a esta substituição devem atender ao disposto no Módulo 9 do PRORET. Foi considerada receita adicional de O&M para o novo equipamento. SGPMR 0001433/2022 | ||||
| AXIA Energia Nordeste | OLINDINA | RTB 500 kV 150 Mvar OLINDINA RT7 BA | RB | FT RTB 500 kV 150 Mvar OLINDINA RT7 BA | 061/2001 | IPCA | RBNIA | REA 14983/2023 | R$ 2,358,713.55 | 6/1/2025 | Prevista | T2023-181 | Instalação do 3º banco de reatores de barra monofásicos de 3 x 50 Mvar / 500 kV na SE Olindina | ||||
| AXIA Energia Nordeste | OLINDINA | RTB 500 kV 150 Mvar OLINDINA RT6 BA | RB | FT RTB 500 kV 150 Mvar OLINDINA RT6 BA | 061/2001 | IPCA | RBNIA | REA 10090/2021 | R$ 1,977,867.69 | 6/1/2025 | Prevista | T2021-028 | Instalar o segundo banco de reatores de barra, monofásico, 3X50 Mvar, 500KV, na SE Olindina. | ||||
| Nova Era Integração | OLINDINA | MG 500 kV OLINDINA MG4 BA | RB | FT MG 500 kV OLINDINA MG4 BA | 008/2024 | IPCA | RBL | CC 008/2024 | R$843,340.11 | 6/1/2025 | Prevista | T2024-197-A | LT 500 kV Zebu III - Olindina C1 | ||||
| AXIA Energia Nordeste | OLINDINA | MG 500 kV OLINDINA MG1 BA | RB | FT MG 500 kV OLINDINA MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,345,249.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OLINDINA | MG 500 kV OLINDINA MG1 BA | RB | FT MG 500 kV OLINDINA MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 7/11/2013 | 7/10/2030 | R$4,309.36 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCOS DE BATERIAS -48Vcc. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | OLINDINA | MG 500 kV OLINDINA MG1 BA | RB | FT MG 500 kV OLINDINA MG1 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 9/13/2013 | 9/12/2030 | R$20,566.70 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BANCOS DE BATERIAS 800A1 E 800A2 DE 125 Vcc. Incluído no reajuste ciclo 2015-2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | OLINDINA | MG 500 kV OLINDINA MG1 BA | RB | FT MG 500 kV OLINDINA MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 3,774,996.07 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OLINDINA | MG 500 kV OLINDINA MG1 BA | RB | FT MG 500 kV OLINDINA MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 12/31/2042 | R$ 3,480,085.14 | 6/1/2025 | Ativa | Parcela de RAP calculada de acordo com a PRT 120/2016 e incluída a partir do ciclo 2017-2018. * Receita revisada provisoriamente no reajuste do ciclo 2018-2019. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OLINDINA | MG 500 kV OLINDINA MG1 BA | RB | FT MG 500 kV OLINDINA MG1 BA | 061/2001 | IPCA | RBNIA | REA 14983/2023 | R$671,853.20 | 6/1/2025 | Prevista | T2023-181 | Adequação do MIG associada à instalação do 3º banco de reatores de barra de 3 x 50 Mvar Monofásico / 500 Kv na SE Olindina | ||||
| AXIA Energia Nordeste | OLINDINA | MG 500 kV OLINDINA MG1 BA | RB | FT MG 500 kV OLINDINA MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/11/2021 | 5/25/2042 | R$599,846.74 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| Nova Era Integração | OLINDINA | MC 500 kV RTL 500 kV 150 Mvar OLINDINA RT8 BA | RB | FT LT 500 kV ZEBU III /OLINDINA C-1 AL/BA | 008/2024 | IPCA | RBL | CC 008/2024 | R$366,609.65 | 6/1/2025 | Prevista | T2024-197-A | LT 500 kV Zebu III - Olindina C1 | ||||
| AXIA Energia Nordeste | OLINDINA | MC 500 kV RTL 500 kV 150 Mvar OLINDINA RT2 BA | RB | FT LT 500 kV JEREMOABO /OLINDINA C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$251,123.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OLINDINA | MC 500 kV RTL 500 kV 150 Mvar OLINDINA RT2 BA | RB | FT LT 500 kV JEREMOABO /OLINDINA C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/3/2021 | 9/8/2046 | R$93,775.88 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | OLINDINA | MC 500 kV RTL 500 kV 150 Mvar OLINDINA RT1 BA | RB | FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$251,123.73 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OLINDINA | MC 500 kV RTL 500 kV 150 Mvar OLINDINA RT1 BA | RB | FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/27/2020 | 7/18/2043 | R$251,679.22 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | OLINDINA | MC 500 kV RTB 500 kV 150 Mvar OLINDINA RT7 BA | RB | FT RTB 500 kV 150 Mvar OLINDINA RT7 BA | 061/2001 | IPCA | RBNIA | REA 14983/2023 | R$ 2,034,780.72 | 6/1/2025 | Prevista | T2023-181 | Conexão de Reator de Barra 500 kV - DJM do 3º banco de reatores de barra de 3 x 50 Mvar na SE Olindina | ||||
| AXIA Energia Nordeste | OLINDINA | MC 500 kV RTB 500 kV 150 Mvar OLINDINA RT6 BA | RB | FT RTB 500 kV 150 Mvar OLINDINA RT6 BA | 061/2001 | IPCA | RBNIA | REA 10090/2021 | R$ 1,473,014.05 | 6/1/2025 | Prevista | T2021-028 | Instalar um módulo de manobra de conexão de reator de barra (500KV - DJM), RT6. | ||||
| AXIA Energia Nordeste | OLINDINA | MC 230 kV TR 230/13,8 kV OLINDINA TR1 BA | RBF | FT TR 230/13,8 kV OLINDINA TR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$137,964.55 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OLINDINA | MC 230 kV TR 230/13,8 kV OLINDINA TR1 BA | RBF | FT TR 230/13,8 kV OLINDINA TR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/12/2021 | 10/11/2045 | R$25,563.14 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | OLINDINA | MC 13,8 kV TR 13,8/0,46 kV OLINDINA TR3 BA | RB | FT MG 500 kV OLINDINA MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OLINDINA | MC 13,8 kV TR 13,8/0,46 kV OLINDINA TR3 BA | RB | FT MG 500 kV OLINDINA MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/20/2020 | 11/25/2052 | R$36,072.38 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | OLINDINA | MC 13,8 kV TR 13,8/0,46 kV OLINDINA TR2 BA | RB | FT MG 500 kV OLINDINA MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OLINDINA | MC 13,8 kV TR 13,8/0,46 kV OLINDINA TR2 BA | RB | FT MG 500 kV OLINDINA MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/20/2020 | 12/11/2052 | R$33,311.80 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| Nova Era Integração | OLINDINA | IB 500 kV MG 500 kV OLINDINA MG4 BA IB8 | RB | FT MG 500 kV OLINDINA MG4 BA | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,496,276.82 | 6/1/2025 | Prevista | T2024-197-A | LT 500 kV Zebu III - Olindina C1 | ||||
| AXIA Energia Nordeste | OLINDINA | IB 500 kV MG 500 kV OLINDINA MG1 BA IB7 | RB | FT MG 500 kV OLINDINA MG1 BA | 061/2001 | IPCA | RBNIA | REA 14983/2023 | R$ 2,320,442.24 | 6/1/2025 | Prevista | T2023-181 | Interligação de Barras 500 kV - DJM na SE Olindina devido à instalação do 3º banco de reatores de barra de 3 x 50 Mvar | ||||
| AXIA Energia Nordeste | OLINDINA | IB 500 kV MG 500 kV OLINDINA MG1 BA IB3 | RB | FT MG 500 kV OLINDINA MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$439,875.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OLINDINA | IB 500 kV MG 500 kV OLINDINA MG1 BA IB3 | RB | FT MG 500 kV OLINDINA MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/17/2022 | 2/20/2052 | R$111,019.22 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | OLINDINA | IB 500 kV MG 500 kV OLINDINA MG1 BA IB2 | RB | FT MG 500 kV OLINDINA MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$439,875.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OLINDINA | IB 500 kV MG 500 kV OLINDINA MG1 BA IB2 | RB | FT MG 500 kV OLINDINA MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 1/9/2022 | 1/29/2053 | R$510,105.44 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | OLINDINA | IB 500 kV MG 500 kV OLINDINA MG1 BA IB1 | RB | FT MG 500 kV OLINDINA MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$439,875.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OLINDINA | IB 500 kV MG 500 kV OLINDINA MG1 BA IB1 | RB | FT MG 500 kV OLINDINA MG1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,234,365.24 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OLINDINA | IB 500 kV MG 500 kV OLINDINA MG1 BA IB1 | RB | FT MG 500 kV OLINDINA MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/19/2022 | 2/18/2053 | R$545,360.99 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| Nova Era Integração | OLINDINA | EL 500 kV OLINDINA LT 500 kV ZEBU III /OLINDINA C-1 AL/BA | RB | FT LT 500 kV ZEBU III /OLINDINA C-1 AL/BA | 008/2024 | IPCA | RBL | CC 008/2024 | R$ 1,405,563.66 | 6/1/2025 | Prevista | T2024-197-A | LT 500 kV Zebu III - Olindina C1 | ||||
| AXIA Energia Nordeste | OLINDINA | EL 500 kV OLINDINA LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE | RB | FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$469,641.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OLINDINA | EL 500 kV OLINDINA LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE | RB | FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/1/2021 | 4/6/2049 | R$705,993.66 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | OLINDINA | EL 500 kV OLINDINA LT 500 kV OLINDINA /CAMACARI II C-2 BA | RB | FT LT 500 kV OLINDINA /CAMACARI II C-2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$469,641.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OLINDINA | EL 500 kV OLINDINA LT 500 kV OLINDINA /CAMACARI II C-2 BA | RB | FT LT 500 kV OLINDINA /CAMACARI II C-2 BA | 061/2001 | IPCA | RMEL | REN 643/2014 | 2/2/2014 | 7/25/2045 | R$15,742.40 | 6/1/2025 | Ativa | Revitalização Necessária: SUBSTITUIÇÃO DO TPC HAEFELY-ER 85L5 FASE B. Incluído no recurso contra a REH 2.098/2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | OLINDINA | EL 500 kV OLINDINA LT 500 kV OLINDINA /CAMACARI II C-2 BA | RB | FT LT 500 kV OLINDINA /CAMACARI II C-2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/13/2021 | 12/18/2050 | R$647,160.91 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | OLINDINA | EL 500 kV OLINDINA LT 500 kV OLINDINA /CAMACARI II C-1 BA | RB | FT LT 500 kV OLINDINA /CAMACARI II C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$469,641.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OLINDINA | EL 500 kV OLINDINA LT 500 kV OLINDINA /CAMACARI II C-1 BA | RB | FT LT 500 kV OLINDINA /CAMACARI II C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/12/2021 | 12/26/2050 | R$680,621.36 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | OLINDINA | EL 500 kV OLINDINA LT 500 kV JEREMOABO /OLINDINA C-1 BA | RB | FT LT 500 kV JEREMOABO /OLINDINA C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$469,641.83 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OLINDINA | EL 500 kV OLINDINA LT 500 kV JEREMOABO /OLINDINA C-1 BA | RB | FT LT 500 kV JEREMOABO /OLINDINA C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 8/26/2021 | 8/27/2051 | R$631,325.44 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | OLINDINA | EL 230 kV OLINDINA LT 230 kV OLINDINA /RL (CIC. DANTAS /CATU) C-2 BA | RB | FT LT 230 kV OLINDINA /RL (CIC. DANTAS /CATU) C-2 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$205,181.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OLINDINA | EL 230 kV OLINDINA LT 230 kV OLINDINA /RL (CIC. DANTAS /CATU) C-2 BA | RB | FT LT 230 kV OLINDINA /RL (CIC. DANTAS /CATU) C-2 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/19/2022 | 2/11/2050 | R$84,327.37 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | OLINDINA | EL 230 kV OLINDINA LT 230 kV OLINDINA /RL (CIC. DANTAS /CATU) C-1 BA | RB | FT LT 230 kV OLINDINA /RL (CIC. DANTAS /CATU) C-1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$205,181.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OLINDINA | EL 230 kV OLINDINA LT 230 kV OLINDINA /RL (CIC. DANTAS /CATU) C-1 BA | RB | FT LT 230 kV OLINDINA /RL (CIC. DANTAS /CATU) C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/13/2022 | 4/7/2050 | R$84,701.39 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | OLINDINA | EL 230 kV OLINDINA LT 230 kV OLINDINA /CATU C-1 BA | RB | FT LT 230 kV OLINDINA /CATU C-1 BA | 061/2001 | IPCA | RBNIA | REA 12983/2022 | R$234,325.58 | 6/1/2025 | Prevista | T2022-113 | Adequação dos sistemas de proteção, telecomunicações, supervisão e controle no módulo de manobra - entrada de linha da linha de transmissão seccionada na SE Olindia | ||||
| AXIA Energia Nordeste | OLINDINA | EL 13,8 kV OLINDINA N.SOURE-01Y1 | DIT | 061/2001 | IPCA | RPC | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$49,955.58 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | ||||
| AXIA Energia Nordeste | OLINDINA | EL 13,8 kV OLINDINA N.SOURE-01Y1 | DIT | 061/2001 | IPCA | RMEL | REN 443/2011 | 1/12/2016 | 1/14/2046 | R$4,343.24 | 6/1/2025 | Ativa | Instalação de contatos auxiliares de chaves seccionadoras. RAP incluída na análise do recurso da REH 2.258/2017. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | ||||
| AXIA Energia Sul | OSORIO 2 | MG 230 kV OSORIO 2 MG2 RS | RB | FT MG 230 kV OSORIO 2 MG2 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,172.28 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Sul | OSORIO 2 | MG 230 kV OSORIO 2 MG2 RS | RB | FT MG 230 kV OSORIO 2 MG2 RS | 057/2001 | IPCA | RBNI | REA 5861/2016 | 5/7/2019 | 5/6/2036 | R$28,669.78 | 6/1/2025 | Ativa | Instalação de 1 carregador de bateria de 48 Vcc * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2021 - 2022 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Sul | OSORIO 2 | MG 230 kV OSORIO 2 MG2 RS | RB | FT MG 230 kV OSORIO 2 MG2 RS | 057/2001 | IPCA | RMEL | REN 905/2020 | 12/24/2022 | 12/23/2037 | R$12,216.57 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Sul | OSORIO 2 | EL 230 kV OSORIO 2 LT 230 kV ATLANTIDA 2 /OSORIO 2 C-1 RS | RB | FT LT 230 kV ATLANTIDA 2 /OSORIO 2 C-1 RS | 057/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$184,040.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | OURO PRETO 2 | TR 500/345 kV OURO PRETO 2 TRR1 MG | RB | FT TR 500/345 kV OURO PRETO 2 TRR1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$541,948.15 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | OURO PRETO 2 | TR 500/345 kV OURO PRETO 2 TR5 MG | RB | FT TR 500/345 kV OURO PRETO 2 TR5 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,627,340.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | OURO PRETO 2 | RTL 345 kV 60 Mvar OURO PRETO 2 RTS5 MG | RB | FT RTL 345 kV 60 MVAr OURO PRETO 2 RTS5 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$473,185.96 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | OURO PRETO 2 | MG 345 kV OURO PRETO 2 MG2 MG | RB | FT MG 345 kV OURO PRETO 2 MG2 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$963,853.31 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | OURO PRETO 2 | MG 345 kV OURO PRETO 2 MG2 MG | RB | FT MG 345 kV OURO PRETO 2 MG2 MG | 062/2001 | IPCA | RBNI | REA 8314/2019 | 4/28/2021 | 4/27/2036 | R$129,526.07 | 6/1/2025 | Ativa | Implantação de Unidade de Medição Fasorial – PMU e sistema de comunicação associado adicional para transmissão das medidas para o ONS, na barra da subestação. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | OURO PRETO 2 | MC 500 kV TR 500/345 kV OURO PRETO 2 TR5 MG | RB | FT TR 500/345 kV OURO PRETO 2 TR5 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$395,602.46 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | OURO PRETO 2 | MC 345 kV TR 500/345 kV OURO PRETO 2 TR5 MG | RB | FT TR 500/345 kV OURO PRETO 2 TR5 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$249,483.20 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | OURO PRETO 2 | MC 345 kV RTL 345 kV 60 Mvar OURO PRETO 2 RTS5 MG | RB | FT RTL 345 kV 60 MVAr OURO PRETO 2 RTS5 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$153,441.02 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | OURO PRETO 2 | MC 345 kV BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG | RB | FT BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$247,849.79 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | OURO PRETO 2 | MC 345 kV BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG | RB | FT BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG | 062/2001 | IPCA | RMEL | REN 643/2014 | 11/25/2016 | 12/16/2048 | R$48,556.25 | 6/1/2025 | Ativa | Substituição de DISJUNTOR DJ70P4 do BC04. Receita incluída após Recurso interposto em face da REH 2.258/2017. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | OURO PRETO 2 | IB 500 kV MG 500 kV OURO PRETO 2 MG3 MG IB3 | RB | FT MG 500 kV OURO PRETO 2 MG3 MG | 003/2009 | IPCA | RBL | CC 003/2009 | 1/28/2009 | 1/28/2039 | R$252,085.99 | 6/1/2025 | Ativa | T2009-194 | Contrato de Concessão nº 003/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia | OURO PRETO 2 | IB 345 kV MG 345 kV OURO PRETO 2 MG2 MG IB1 | RB | FT MG 345 kV OURO PRETO 2 MG2 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$242,081.37 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | OURO PRETO 2 | EL 500 kV OURO PRETO 2 LT 500 kV B.DESPACHO 3 /OURO PRETO 2 C-1 MG | RB | FT LT 500 kV B.DESPACHO 3 /OURO PRETO 2 C-1 MG | 003/2009 | IPCA | RBL | CC 003/2009 | 1/28/2009 | 1/28/2039 | R$693,450.89 | 6/1/2025 | Ativa | T2009-194 | Contrato de Concessão nº 003/2009 *(Considera adicional de RGR relativo à prorrogação do encargo). * Receita Revisada no Ciclo 2014-2015. * Receita revisada em 10-06-2019 * Receita revisada em 19-06-2024 | ||
| AXIA Energia | OURO PRETO 2 | EL 345 kV OURO PRETO 2 LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG | RB | FT LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$297,201.40 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | OURO PRETO 2 | EL 345 kV OURO PRETO 2 LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG | RB | FT LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG | 062/2001 | IPCA | RBNI | REA 8314/2019 | 3/10/2021 | 3/9/2036 | R$42,638.82 | 6/1/2025 | Ativa | Implantação de sistema de comunicação associado à Unidade de Medição Fasorial – PMU indicada na obra Nº SGPMR 000438/2014. (FT: LT 345 kV BARRO BRANCO / OURO PRETO 2 C 1 MG) * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2022 - 2023 *(Receita revisada em 03/07/2024) | |||
| AXIA Energia | OURO PRETO 2 | BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG | RB | FT BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG | 062/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$304,842.20 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia | OURO PRETO 2 | BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG | RB | FT BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG | 062/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,169,794.51 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | OUROLANDIA II | MG 230 kV OUROLANDIA II MG3 BA | RB | FT MG 230 kV OUROLANDIA II MG3 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 9/30/2022 | 8/11/2044 | R$80,722.80 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | OUROLANDIA II | EL 230 kV OUROLANDIA II LT 230 kV OUROLANDIA II /IRECE C-1 BA | RB | FT LT 230 kV OUROLANDIA II /IRECE C-1 BA | 061/2001 | IPCA | RBNI | REA 9690/2021 | 6/4/2019 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Ourolândia II, associada à linha de transmissão 230kV Irecê – Ourolândia II. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | OUROLANDIA II | EL 230 kV OUROLANDIA II LT 230 kV OUROLANDIA II /IRECE C-1 BA | RB | FT LT 230 kV OUROLANDIA II /IRECE C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2022 | 12/30/2037 | R$6,686.70 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | OUROLANDIA II | EL 230 kV OUROLANDIA II LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA | RB | FT LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA | 061/2001 | IPCA | RBNI | REA 9690/2021 | 6/4/2019 | 12/31/2042 | R$80,686.65 | 6/1/2025 | Ativa | Parcela adicional de RAP para operação e manutenção de entrada de linha em 230 kV, arranjo barra dupla com quatro chaves, na subestação Ourolândia II, associada à linha de transmissão 230kV Ourolândia II - Campo Formoso. *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | OUROLANDIA II | EL 230 kV OUROLANDIA II LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA | RB | FT LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 12/31/2022 | 12/30/2037 | R$13,373.41 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | P. AFONSO IV | TR 500/230 kV P. AFONSO IV TRR1 BA | RB | FT TR 500/230 kV P. AFONSO IV TRR1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$622,465.03 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | P. AFONSO IV | TR 500/230 kV P. AFONSO IV TRR1 BA | RB | FT TR 500/230 kV P. AFONSO IV TRR1 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 1,746,742.06 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | P. AFONSO IV | TR 500/230 kV P. AFONSO IV TRR1 BA | RB | FT TR 500/230 kV P. AFONSO IV TRR1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/13/2022 | 5/21/2057 | R$ 149.49 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | P. AFONSO IV | TR 500/230 kV P. AFONSO IV TR8 BA | RB | FT TR 500/230 kV P. AFONSO IV TR8 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,867,395.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | P. AFONSO IV | TR 500/230 kV P. AFONSO IV TR8 BA | RB | FT TR 500/230 kV P. AFONSO IV TR8 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 5,240,226.18 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | P. AFONSO IV | TR 500/230 kV P. AFONSO IV TR8 BA | RB | FT TR 500/230 kV P. AFONSO IV TR8 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/24/2022 | 6/1/2057 | R$165,521.06 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | P. AFONSO IV | TR 500/230 kV P. AFONSO IV TR7 BA | RB | FT TR 500/230 kV P. AFONSO IV TR7 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 1,867,395.10 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | P. AFONSO IV | TR 500/230 kV P. AFONSO IV TR7 BA | RB | FT TR 500/230 kV P. AFONSO IV TR7 BA | 061/2001 | IPCA | RBSE | PRT 120/2016 | 7/1/2017 | 6/30/2028 | R$ 5,240,226.18 | 6/1/2025 | Ativa | Componente Financeiro apurado referente ao período de Janeiro/2013 a Junho/2017, com prazo de pagamento de 8 anos, conforme consta no § 3º e § 4º, do Art. 1º, da PRT 120/2016. * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | P. AFONSO IV | TR 500/230 kV P. AFONSO IV TR7 BA | RB | FT TR 500/230 kV P. AFONSO IV TR7 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 5/22/2022 | 4/29/2057 | R$150,776.01 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | P. AFONSO IV | MG 500 kV P. AFONSO IV MG1 BA | RB | FT MG 500 kV P. AFONSO IV MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$ 2,507,382.43 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | P. AFONSO IV | MG 500 kV P. AFONSO IV MG1 BA | RB | FT MG 500 kV P. AFONSO IV MG1 BA | 061/2001 | IPCA | RMEL | REN 443/2011 | 10/20/2016 | 10/19/2033 | R$12,278.81 | 6/1/2025 | Ativa | SUBSTITUIÇÃO DE BATERIAS - 125Vcc * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2017 - 2018 *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | P. AFONSO IV | MG 500 kV P. AFONSO IV MG1 BA | RB | FT MG 500 kV P. AFONSO IV MG1 BA | 061/2001 | IPCA | RBNI | REA 6137/2016 | 5/27/2019 | 12/23/2049 | R$30,687.10 | 6/1/2025 | Ativa | T2016-091 | Complementação do Módulo geral da SE Paulo Afonso IV referente ás adequações do módulo de conexão 500 kV do transformador TR8. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | P. AFONSO IV | MG 500 kV P. AFONSO IV MG1 BA | RB | FT MG 500 kV P. AFONSO IV MG1 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/25/2019 | 9/7/2038 | R$424,737.45 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | P. AFONSO IV | MG 500 kV P. AFONSO IV MG1 BA | RB | FT MG 500 kV P. AFONSO IV MG1 BA | 061/2001 | IPCA | RBNI | DSP 386/2021 | 8/12/2022 | 8/11/2037 | R$113,704.16 | 6/1/2025 | Ativa | Instalação de UTR (composto por uma Unidade Remota de Comandos, GPS e cabos de controle) em substituição à existente. Reconfiguração em bases da UTR, SAGE e relés auxiliares e adequações na fiação e cabeação dos painéis de proteção e controle. Obra reconhecida na Revisão da RAP. * Reforço autorizado sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | P. AFONSO IV | MC 500 kV TR 500/230 kV P. AFONSO IV TR8 BA | RB | FT TR 500/230 kV P. AFONSO IV TR8 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$414,502.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | P. AFONSO IV | MC 500 kV TR 500/230 kV P. AFONSO IV TR8 BA | RB | FT TR 500/230 kV P. AFONSO IV TR8 BA | 061/2001 | IPCA | RBNI | REA 6137/2016 | 5/27/2019 | 4/24/2052 | R$99,822.05 | 6/1/2025 | Ativa | T2016-091 | Remanejamento do módulo de conexão 500 kV do transformador 500/230 kV TR8 para o vão adjacente. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | P. AFONSO IV | MC 500 kV TR 500/230 kV P. AFONSO IV TR8 BA | RB | FT TR 500/230 kV P. AFONSO IV TR8 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 6/13/2021 | 7/27/2045 | R$56,216.88 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | P. AFONSO IV | MC 500 kV TR 500/230 kV P. AFONSO IV TR7 BA | RB | FT TR 500/230 kV P. AFONSO IV TR7 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$414,502.34 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | P. AFONSO IV | MC 500 kV TR 500/230 kV P. AFONSO IV TR7 BA | RB | FT TR 500/230 kV P. AFONSO IV TR7 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 2/6/2021 | 1/17/2052 | R$298,692.35 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | P. AFONSO IV | MC 230 kV TR 500/230 kV P. AFONSO IV TR8 BA MC2 | RB | FT TR 500/230 kV P. AFONSO IV TR8 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | P. AFONSO IV | MC 230 kV TR 500/230 kV P. AFONSO IV TR8 BA MC2 | RB | FT TR 500/230 kV P. AFONSO IV TR8 BA | 061/2001 | IPCA | RBNI | REA 2040/2009 | 1/25/2016 | 1/27/2046 | R$90,971.67 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 230 kV associadas ao disjuntor 14T8-A. Incluído no recurso em face da REH 2.098/2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | P. AFONSO IV | MC 230 kV TR 500/230 kV P. AFONSO IV TR8 BA MC2 | RB | FT TR 500/230 kV P. AFONSO IV TR8 BA | 061/2001 | IPCA | RBNI | REA 6137/2016 | 6/5/2019 | 6/7/2049 | R$61,253.63 | 6/1/2025 | Ativa | T2016-090 | Adequação, na Subestação Paulo Afonso IV, do módulo de conexão de transformador 230 kV TR 500/230 kV P. AFONSO IV TR8 BA MC2 com a substituição de três transformadores de corrente e implantação de proteção de barra adaptativa conjugada com falha de disjuntor. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | P. AFONSO IV | MC 230 kV TR 500/230 kV P. AFONSO IV TR8 BA MC1 | RB | FT TR 500/230 kV P. AFONSO IV TR8 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | P. AFONSO IV | MC 230 kV TR 500/230 kV P. AFONSO IV TR8 BA MC1 | RB | FT TR 500/230 kV P. AFONSO IV TR8 BA | 061/2001 | IPCA | RBNI | REA 2040/2009 | 1/25/2016 | 1/27/2046 | R$83,471.34 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 230 kV associadas ao disjuntor 14T8-B. Incluído no recurso em face da REH 2.098/2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | P. AFONSO IV | MC 230 kV TR 500/230 kV P. AFONSO IV TR8 BA MC1 | RB | FT TR 500/230 kV P. AFONSO IV TR8 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 7/2/2021 | 7/1/2045 | R$25,323.77 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | P. AFONSO IV | MC 230 kV TR 500/230 kV P. AFONSO IV TR7 BA MC2 | RB | FT TR 500/230 kV P. AFONSO IV TR7 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | P. AFONSO IV | MC 230 kV TR 500/230 kV P. AFONSO IV TR7 BA MC2 | RB | FT TR 500/230 kV P. AFONSO IV TR7 BA | 061/2001 | IPCA | RBNI | REA 2040/2009 | 1/25/2016 | 1/27/2046 | R$83,471.34 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 230 kV associadas ao disjuntor 14T7-B. Incluído em face do recurso contra a REH 2.098/2016. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | P. AFONSO IV | MC 230 kV TR 500/230 kV P. AFONSO IV TR7 BA MC2 | RB | FT TR 500/230 kV P. AFONSO IV TR7 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 3/10/2020 | 3/13/2050 | R$55,147.98 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | P. AFONSO IV | MC 230 kV TR 500/230 kV P. AFONSO IV TR7 BA MC1 | RB | FT TR 500/230 kV P. AFONSO IV TR7 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$161,968.64 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | P. AFONSO IV | MC 230 kV TR 500/230 kV P. AFONSO IV TR7 BA MC1 | RB | FT TR 500/230 kV P. AFONSO IV TR7 BA | 061/2001 | IPCA | RBNI | REA 2040/2009 | 4/30/2015 | 5/2/2045 | R$88,746.80 | 6/1/2025 | Ativa | Substituição de Chaves seccionadoras 230 kV associadas ao disjuntor 14T7-A. Incluída após Recurso em face da REH 1.918/2015. *(Receita revisada em 06/07/2020) *(Receita revisada em 03/07/2024) | |||
| AXIA Energia Nordeste | P. AFONSO IV | MC 230 kV TR 500/230 kV P. AFONSO IV TR7 BA MC1 | RB | FT TR 500/230 kV P. AFONSO IV TR7 BA | 061/2001 | IPCA | RBNI | REA 6137/2016 | 11/28/2019 | 11/30/2049 | R$62,119.88 | 6/1/2025 | Ativa | T2016-090 | Adequação, na Subestação Paulo Afonso IV, do módulo de conexão de transformador 230 kV TR 500/230 kV P. AFONSO IV TR7 BA MC1 com a substituição de três transformadores de corrente e implantação de proteção de barra adaptativa conjugada com falha de disjuntor. *(Receita revisada em 03/07/2024) | ||
| AXIA Energia Nordeste | P. AFONSO IV | MC 230 kV TR 500/230 kV P. AFONSO IV TR7 BA MC1 | RB | FT TR 500/230 kV P. AFONSO IV TR7 BA | 061/2001 | IPCA | RMEL | REN 905/2020 | 10/24/2021 | 10/23/2045 | R$59,714.61 | 6/1/2025 | Ativa | Melhorias de Pequeno Porte sem RAP Prévia incluídas no processo de revisão da RAP das transmissoras prorrogadas de 2023, nos termos do Módulo 3 das Regras dos Serviços de Transmissão de Energia Elétrica. * Melhoria autorizada sem RAP Prévia incluído no reajuste do Ciclo 2024 - 2025 *(Receita revisada em 04/07/2024) | |||
| AXIA Energia Nordeste | P. AFONSO IV | MC 13,8 kV TR 18/13,8 kV P. AFONSO IV TR2 BA | RB | FT MG 500 kV P. AFONSO IV MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | P. AFONSO IV | MC 13,8 kV TR 18/13,8 kV P. AFONSO IV TR1 BA | RB | FT MG 500 kV P. AFONSO IV MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$44,666.29 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 | |||
| AXIA Energia Nordeste | P. AFONSO IV | IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB7 | RB | FT MG 500 kV P. AFONSO IV MG1 BA | 061/2001 | IPCA | RBSE | PRT 579/2012 | 1/1/2013 | 1/1/2043 | R$439,875.59 | 6/1/2025 | Ativa | *(RAP Portaria 579/2012 - Concessão prorrogada em 01/01/2013 – LEI 12783/2013 ) * Receita revisada no ciclo 2020-2021. * Receita revisada em 05-07-2024 |