Elevra Lithium Q1 unit operating costs fall 14%

A binding LG Energy Solution agreement covers 240,000 dmt over three years; annual volumes ramp from 30kt to 90kt, with up to 90kt optional.

Available on EDGAR Accepted by SEC EDGAR Learn about SEC filing dates
(Moderate)

Sentiment and the balance of points

Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.

Form Type
6-K

Rhea-AI Filing Summary

Elevra Lithium Ltd reported Q1 FY27 revenue of US$74 million, producing 54,907 dry metric tonnes and selling 58,134 dry metric tonnes. Unit operating cost sold was US$780/dmt, down 14% quarter over quarter; cash was US$319 million as of September 30, 2026.

FY27 guidance is 198,000–210,000 dmt of production, 200,000–230,000 dmt of sales, US$880–US$950/dmt sold in unit costs and US$120–US$140 million in capital expenditure. The NAL expansion targets capacity growth from 199ktpa to approximately 373ktpa, with estimated expansion capex of US$271 million. Elevra completed the sale of all rights and interests in Ewoyaa, including offtake rights, to Zhejiang Huayou Cobalt on October 26, 2026, for approximately US$71 million in cash consideration before fees and taxes; proceeds were received after quarter end and excluded from September 30 cash.

Separately, 132,928 performance rights converted into ordinary shares and 89,275 performance rights lapsed. Ordinary shares on issue following the notices were 194,016,029.

2 points · 1 major

How this balance works

Rhea-AI gives every point it takes from this document a weight. Minor counts 1, Moderate 3 and Major 9, so one Major point outweighs several Minor ones. The bar adds up the weights on each side, and when neither side holds more than 65% of the total the balance reads Mixed.

It reads the document as published, with the same rules for every company, and it does not look at what the market expected or at how the stock traded, so a point can be objectively good on a day the stock falls.

Rhea-AI Sentiment measures something else, the tone of the wording.

0 major · 0 points

How the balance works

Positive

  • Major pointEwoyaa sale brought approximately US$71 million in cash consideration before fees and taxes. 15% of market cap
  • Moderate pointUnit operating cost sold fell 14% quarter over quarter to US$780/dmt.

Negative

  • None.

Filing Explained

The rights conversion used existing shares; LG's binding offtake is contracted, while Mangrove's separate agreement depends on a positive FID by December 31, 2028.

The November 6 Form 6-K furnishes two securities notices and a November investor presentation from Elevra. The performance-right conversion completed from November 2 to 4 was satisfied by transferring already-quoted ordinary shares, so this conversion did not add shares to the ordinary-share count.

The presentation describes a binding LG Energy Solution supply agreement for 240,000 dmt over three years, with annual volumes ramping and up to 90,000 dmt optional. A separate binding agreement with Mangrove Lithium is conditional on Mangrove achieving positive FID by December 31, 2028; its stated price floor is above expected production cost, with no ceiling.

Q1 FY27 Revenue US$74 million Q1 FY27
Q1 FY27 Production 54,907 dry metric tonnes Q1 FY27
Q1 FY27 Sales 58,134 dry metric tonnes Q1 FY27
Unit Operating Cost Sold US$780/dmt sold Q1 FY27; down 14% quarter over quarter
Cash US$319 million As of September 30, 2026
FY27 Capital Expenditure Guidance US$120–US$140 million FY27 guidance
Ewoyaa Cash Consideration Approximately US$71 million Before fees and taxes
NAL Expansion Capacity Target Approximately 373ktpa Targeted increase from 199ktpa
spodumene concentrate technical
"spodumene concentrate produced at 5.1% grade"
A processed rock product that concentrates spodumene, a mineral rich in lithium, which is then refined into lithium chemicals used to make rechargeable batteries. Think of it as the crude oil equivalent for lithium batteries: an early-stage raw material whose availability and price influence the cost and supply of battery-grade lithium. Investors watch spodumene concentrate as an indicator of future battery material supply, production costs, and the health of electric-vehicle and energy-storage supply chains.
FOB technical
"US$/dmt sold, FOB Port of Québec"
FOB (Free On Board) is a shipping contract term that specifies the exact point when ownership, shipping costs, and liability for goods shift from the seller to the buyer. Think of it like handing over the keys when a car crosses a line: once the goods pass that point (often the seller’s dock or the ship’s rail), the buyer is responsible for transport, insurance, and any loss. For investors, FOB affects cash flow, inventory timing, and which party bears shipping risk and expense, all of which influence profit margins and balance-sheet reporting.
Final Investment Decision technical
"funded to a Final Investment Decision"
A final investment decision is the point at which a person or organization chooses to move forward with a particular project or purchase after reviewing all the necessary information and options. It is like deciding to buy a house after considering all the costs, benefits, and alternatives. This decision is important because it determines whether and when the investment will be made, impacting future financial plans and outcomes.
Mineral Resource Estimate technical
"Attributable Measured & Indicated & Inferred Mineral Resource Estimate"
A mineral resource estimate is a calculated approximation of how much metal or mineral material likely exists in a particular deposit and where it sits underground, similar to estimating how many cookies are in a jar by peeking at the layers. It matters to investors because it provides a data-based starting point for judging a project's potential value, future production and risks, while not guaranteeing recoverable or profitable amounts.
C1 Cost of Concentrate financial
"C1 Cost of Concentrate Average LOM"

FAQ

AI-generated questions and answers. How Rhea-AI works. Not financial advice.

What were ELVR’s Q1 FY27 operating results?

Elevra reported US$74 million in Q1 FY27 revenue, produced 54,907 dry metric tonnes and sold 58,134 dry metric tonnes; unit operating cost sold was US$780/dmt, down 14% quarter over quarter.

What is ELVR’s FY27 guidance?

Elevra’s FY27 guidance is 198,000–210,000 dmt of production, 200,000–230,000 dmt of sales, US$880–US$950/dmt sold in unit operating costs and US$120–US$140 million in capital expenditures.

How much was the Ewoyaa sale consideration?

Elevra completed the sale on October 26, 2026, for approximately US$71 million in cash consideration before fees and taxes. Proceeds were received after quarter end and were excluded from cash as of September 30, 2026.

What are the terms of ELVR’s LG Energy Solution supply agreement?

The binding agreement covers 240,000 dmt over three years. Annual volumes ramp from 30kt to 90kt, with up to 90kt optional, and pricing is market-linked and adjusted for lithium content.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549



Form 6-K



REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934

For the month of November 2026

Commission File Number 001-42819


ELEVRA LITHIUM LIMITED
(Translation of registrant’s name into English)


Level 3,
10 Eagle Street
Brisbane, Queensland 4000
Australia
(Address of principal executive office)



Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.

Form 20-F  ☒
Form 40-F  ☐



Elevra Lithium Limited (the “Registrant”) is furnishing the following exhibits on this Report on Form 6-K, each of which is hereby incorporated by reference:

Exhibit

No.
Description
99.1
Appendix 3G – Notification of issue, conversion or payment up of unquoted equity securities, filed by the Registrant with the Australian Securities Exchange on November 5, 2026.
99.2
Appendix 3H – Notification of cessation of securities, filed by the Registrant with the Australian Securities Exchange on November 5, 2026.
99.3
Presentation titled “Elevra Lithium – Providing a Secure and Reliable Supply of Lithium in North America”, filed by the Registrant with the Australian Securities Exchange on November 6, 2026.


SIGNATURE

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.


ELEVRA LITHIUM LIMITED



By: /s/ Dylan Roberts
Date: November 6, 2026

Name: Dylan Roberts


Title: Company Secretary and General Counsel




Exhibit 99.1


Appendix 3G - Notification of issue, conversion or payment up of unquoted equity securities

Announcement Summary


Entity name

ELEVRA LITHIUM LIMITED

Date of this announcement

Thursday November 05, 2026

The +securities the subject of this notification are:
Unquoted options that have been exercised or other unquoted +convertible securities that have been converted
Total number of +securities to be issued/transferred


ASX +security code
Security description

Total number of
+securities to be issued/transferred

Issue date








ELV
ORDINARY FULLY PAID

132,928

04/11/2026







Refer to next page for full details of the announcement

Appendix 3G - Notification of issue, conversion or payment up of unquoted equity securities
1/6


Appendix 3G - Notification of issue, conversion or payment up of unquoted equity securities
Part 1 - Entity and announcement details


  1.1
Name of entity

ELEVRA LITHIUM LIMITED

We (the entity named above) give notice of the issue, conversion or payment up of the following unquoted +securities.

1.2  Registered number type
Registration number


ABN
26091951978


1.3
ASX issuer code

ELV


1.4
The announcement is

New announcement


1.5
Date of this announcement

5/11/2026

Appendix 3G - Notification of issue, conversion or payment up of unquoted equity securities
2/6


Appendix 3G - Notification of issue, conversion or payment up of unquoted equity securities
Part 2 - Issue details



2.1
The +securities the subject of this notification are:
Unquoted options that have been exercised or other unquoted +convertible securities that have been converted


2.2
b The +securities being issued, transferred or re-classified as a result of the options being exercised or other
+convertible securities being converted are:
securities that have already been quoted on ASX ("existing class")

Appendix 3G - Notification of issue, conversion or payment up of unquoted equity securities
3/6


Appendix 3G - Notification of issue, conversion or payment up of unquoted equity securities
Part 3B - number and type of +securities the subject of this notification (existing class) where issue has not previously been notified to

ASX in an Appendix 3B


The right of the holder of the options or other +convertible securities to receive the +underlying securities is being satisfied by:
A transfer of existing +securities

The underlying securities being received by the holder are:
Already quoted by ASX

Existing +securities converting into an existing class

FROM (Existing Class)
ASX +Security code and description

ELVAM : PERFORMANCE RIGHTS

TO (Existing Class)
ASX +Security code and description

ELV : ORDINARY FULLY PAID


Please state the number of options
that were exercised or other
+convertible securities that were
converted
The first date the options were
exercised or other +convertible
securities were converted
The last date the options were
exercised or other +convertible
securities were converted

132,928 2/11/2026 4/11/2026

Is this all of the options or other +convertible securities on issue of that type?
No
Were the options being exercised or other +convertible securities being converted issued under an +employee incentive scheme?
Yes
Are any of the options being exercised or other +convertible securities being converted held by +key management personnel (KMP) or an +associate?
Yes
Provide details of the KMP or +associates who are exercising options or converting +convertible securities.     


Name of KMP
Name of registered holder   Number of +securities




 

Lucas Dow

Dow Group Investments Pty Ltd
  59,584




 

Sylvain Collard

Sylvain Collard
  52,075

Date the +securities the subject of this notification were issued/transferred

4/11/2026

Any other information the entity wishes to provide about the +securities the subject of this notification


Exercise of Performance Rights under the terms of the Company¿s Employee Share and Option Plan as approved by shareholders at the Company¿s AGM on 28 November 2024.

Appendix 3G - Notification of issue, conversion or payment up of unquoted equity securities
4/6


Appendix 3G - Notification of issue, conversion or payment up of unquoted equity securities
Issue details


Number of +securities

132,928

Appendix 3G - Notification of issue, conversion or payment up of unquoted equity securities
5/6


Appendix 3G - Notification of issue, conversion or payment up of unquoted equity securities
Part 4 - +Securities on issue


Following the issue, conversion or payment up of the +securities the subject of this notification, the +securities of the entity will comprise:

The figures in parts 4.1 and 4.2 below are automatically generated and may not reflect the entity's current issued capital if other Appendix 2A, Appendix 3G or Appendix 3H forms are currently with ASX for processing.


4.1
Quoted +securities (Total number of each +class of +securities issued and quoted on ASX)

ASX +security code and description
Total number of
+securities on issue


ELV : ORDINARY FULLY PAID
194,016,029


4.2
Unquoted +securities (Total number of each +class of +securities issued but not quoted on ASX)

ASX +security code and description
Total number of
+securities on issue
 
 
ELVAM : PERFORMANCE RIGHTS
2,326,884
 
 
ELVAB : OPTION EXPIRING 12-MAY-2029 EX $18.30
56,678
 
 
ELVAC : CONVERTIBLE NOTES
65,000,000
 
 
ELVAN : OPTION EXPIRING 31-DEC-2028 EX $4.80
8,000,000


Appendix 3G - Notification of issue, conversion or payment up of unquoted equity securities
6/6


Exhibit 99.2


Appendix 3H - Notification of cessation of securities

Announcement Summary


Entity name

ELEVRA LITHIUM LIMITED

Announcement Type

New announcement

Date of this announcement

Thursday November 05, 2026

Details of +securities that have ceased


ASX +security
code
Security description
Number of
+securities that
have ceased

The +securities have
ceased due to

Date of
cessation









ELVAM
PERFORMANCE RIGHTS
89,275

Lapse of conditional right to securities because the conditions have not been, or have become incapable of being, satisfied

02/11/2026








Refer to next page for full details of the announcement

Appendix 3H - Notification of cessation of securities
1/4


Appendix 3H - Notification of cessation of securities
Part 1 - Announcement Details



1.1
Name of +Entity

ELEVRA LITHIUM LIMITED

We (the entity named above) provide the following information about our issued capital.

1.2  Registered Number Type
Registration Number


ABN
26091951978


1.3
ASX issuer code

ELV


1.4
The announcement is

New announcement


1.5
Date of this announcement

5/11/2026

Appendix 3H - Notification of cessation of securities
2/4


Appendix 3H - Notification of cessation of securities
Part 2 - Details of +equity securities or +debt securities that have ceased


ASX +Security Code and Description

ELVAM : PERFORMANCE RIGHTS

Unquoted +equity securities that have ceased

Number of securities that have ceased

89,275

Reason for cessation

Lapse of conditional right to securities because the conditions have not been, or have become incapable of being, satisfied

Date of cessation
Is the entity paying any consideration for the cessation?
   
2/11/2026
No

Any other information the entity wishes to notify to ASX about the cessation?


Lapse of 89,275 unlisted Performance Rights pursuant to the terms of the Company's Employee Share and Option Plan.

Appendix 3H - Notification of cessation of securities
3/4


Appendix 3H - Notification of cessation of securities
Part 3 - Issued capital following changes


Following the cessation of the +securities the subject of this notification, the issued capital of the entity will comprise:

The figures in parts 3.1 and 3.2 below are automatically generated and may not reflect the entity's current issued capital if other Appendix 2A, Appendix 3G or Appendix 3H forms are currently with ASX for processing.


3.1
Quoted +equity securities and +debt securities (total number of each +class of +securities quoted on ASX)


ASX +security code and description

Total number of
+securities on issue





ELV : ORDINARY FULLY PAID

194,016,029

 
3.2
Unquoted +equity securities (total number of each +class of +equity securities issued but not quoted on ASX)


ASX +security code and description

Total number of
+securities on issue





ELVAM : PERFORMANCE RIGHTS

2,370,537





ELVAB : OPTION EXPIRING 12-MAY-2029 EX $18.30

56,678





ELVAC : CONVERTIBLE NOTES
65,000,000





ELVAN : OPTION EXPIRING 31-DEC-2028 EX $4.80

8,000,000

Note: the figures stated in the tables above are used to calculate the total market capitalisation of the entity published by ASX from time to time. The table will not include those classes of +securities that have ceased or lapsed in their entirety in ASX records before the announcement date described in Q1.5, even if the entity has advised ASX of a change to that class of +security in Part 2 of this form.

Appendix 3H - Notification of cessation of securities
4/4


Exhibit 99.3

 ASX:ELV • NASDAQ:ELVR  Elevra Lithium  Providing a Secure and Reliable Supply of Lithium in North America  NOVEMBER 2026 
 

 ELEVRA LITHIUM  2  Introducing Elevra Lithium  North America’s Leading Hard-Rock Lithium Producer  Business Highlights:  Q1 FY27 Operations3 Financial3  54,907  Dry metric tonnes produced  58,134  Dry metric tonnes sold  70%  Recovery  US$74 million  Q1 FY27 revenue  US$780/t  Q1 FY27 unit cost sold (FOB)  US$319 million  Cash (at 30 Sep. 2026)  Corporate  US$426 million  Market cap (at 30 Oct. 2026)  194 million  Shares outstanding (at 30 Oct. 2026)  166 Mt @ 1.17% Li2O  Attributable Measured & Indicated & Inferred Mineral Resource Estimate1  Investment Highlights:  ASX: ELV | NASDAQ: ELVR  #1 North American hard rock pure-play lithium producer  Combined lithium Ore Reserve Estimate of 76Mt @ 1.19% Li2O and M&I&I Mineral Resource estimate totalling 166Mt @ 1.17% Li2O1  Scale  Growth  Strategically  Positioned  Fully funded, phased expansion of NAL targeting capacity growth from 199ktpa to approximately 373ktpa2  Diversified growth portfolio with medium term growth at Moblan  Only major North American hard-rock project in production Growing engagement with U.S. and Canadian governments  Backed by Canada Growth Fund, a government-aligned capital partner  North American Lithium  Stage:  Production  Ownership:  100%  Authier  Stage:  Studies  Ownership:  100%  Moblan  Stage:  Studies  Ownership:  60%  Carolina Lithium  Stage:  Studies  Ownership:  100%  Combined spodumene ore reserve estimates and mineral resource estimates (inclusive of reserves). Ore reserve and mineral resource estimates reported in accordance with the JORC code. Metrics as reported and shown on a net attributable basis. See appendix for support.  ASX release “NAL Expansion Pre-Feasibility Study” released 7 September 2026 and all material assumptions underpinning the production target and forecast financial information continue to apply and have not materially changed.  ASX release “September 2026 Quarterly Activities Report” released 27 October 2026. 
 

 North America’s Leading Lithium  Producer  1. Mineral Resource Estimates are based on public company disclosures. Totals may differ due to small rounding. See appendix for support.  ELEVRA LITHIUM  3  91  89  51  33  15  15  Q2 Metals  Elevra  PMET  Resources  Li-FT  Power  Albemarle Rio Tinto  Frontier Lithium  Critical Elements  Sibelco  Rock Tech Lithium  A leading hard rock resource base in North America  Attributable M+I+I Mineral Resource Estimate, Mt 1  295  Measured and Indicated Inferred  166 Largest Measured and Indicated resource base  148  128  Li-FT Power  93Mt @ 1.15% Li2O 
 

 Lithium Market 
 

 Near-Term Lithium Market Weakness  Declines in Chinese lithium carbonate futures have pulled prices lower contrary to falling inventories  GFEX Lithium Carbonate Futures  January 2027 Lithium Carbonate Futures, CNY/t  ELEVRA LITHIUM  5  Source: Fastmarkets  $500  $1,000  $1,500  $2,000  $2,500  $3,000  $3,500  Oct-25  Jan-26  Apr-26  Jul-26  Oct-26  Spodumene Concentrate 6% Price  US$/t, CIF China  80,000  Jul-26 Aug-26  Source: Guangzhou Futures Exchange (GFEX)  90,000  100,000  110,000  120,000  130,000  140,000  150,000  160,000  170,000  Sep-26  Oct-26  Lithium price weakness appears  driven by sentiment  Lithium prices have declined sharply since the end of August with spot prices following GFEX lithium carbonate futures lower.  The initial weakness coincided with an upward revision to Chinese inventory levels following a change in estimate methodology to include additional, non-conventional sources.  In addition, previously idled supply began to re-enter the market as production from mines placed on care-and-maintenance ramped up following a period of supportive pricing.  Futures linked pricing has amplified the volatility, with physical transactions priced with reference to GFEX futures allowing sentiment to feed into spot prices. 
 

 1.57  2.02  2.31  2.61  2.91  3.16  0.0  0.5  1.0  1.5  2.0  2.5  3.0  3.5  4.0  2025 2026 2027 2028 2029 2030  Consensus Max Min  Supportive Demand Outlook into 2030  Demand growth presents opportunity for development projects  Global Lithium Demand  Mt LCE  ELEVRA LITHIUM  6  Broker Outlook  Spodumene Concentrate 6% Price, US$/t  $2,179  $2,086  $1,717  $1,846  $1,749  $1,000  $1,200  $1,400  $1,600  $1,800  $2,000  $2,200  $2,400  2026 2027 2028 2029 2030  Spot Price Consensus  Source: Spot Price sources from Fastmarkets as of 30 October 2026, Consensus  shows average forecast price reported by brokers. See Appendix for details.  Source: Broker forecasts. See Appendix for details.  Medium-term demand outlook  remains strong  Lithium demand is forecast to approximately double from 1.57 Mt LCE in 2025 to 3.16 Mt LCE in 2030.  Lithium demand is broadening. Previous demand cycles were driven by domestic EV sales within China, while new demand has diversified geographically and by application which may reduce volatility across cycles.  EVs remain the primary source of demand, and global EV sales are broadly flat year-over-year through September1.  Stationary storage is the fastest growing segment, accounting for ~25% of lithium demand in 2025 and growing to 30%+ by 20302.  Recent price declines may slow supply-side development with pricing below incentive levels.  Benchmark Mineral Intelligence “Global EV sales reach 2.15 million units in September 2026” dated 16 October 2026.  Stationary storage demand based on average broker forecasts from Benchmark Mineral Intelligence, Canaccord, JP Morgan and Macquarie. 
 

 Corporate strategy and commercial 
 

 01  Optimise Existing Operations  Focused on optimising production sustainably and maximising returns and cashflow generation for NAL  Next 18 Months  Maintain mine performance  Production and cost optimisation  Continued mill utilisation and throughput  improvement  Recovery optimisation  Logistics cost reduction  Improve safety and environmental performance  The Elevra Strategy  Disciplined delivery remains central to our strategy  ELEVRA LITHIUM  8  03  Integrate into the Supply Chain Via Strategic Partnerships  To lock in demand, access end markets, establish a vertically integrated supply chain, and fund the accelerated development of Elevra’s portfolio via downstream partnerships  Next 18 Months  Execute offtake agreements to create a diversified, market-linked and flexible sales portfolio  Build on partnership opportunities, including support from the government, to further advance downstream development in Québec and the U.S.  Focus on options to enable development pathways for Moblan greenfield  02  Develop Assets Following Expanded Resource Base  Deliver portfolio potential through the development of upstream assets off the back of an expanded resource base  Next 18 Months  Deliver NAL expansion stage 1 based on expanded resource base and updated Scoping Study  Revisit Moblan DFS with focus on benefits of increased reserve base, capital intensity & sizing. Updated Scoping Study due in Q4 CY26.  Advance Moblan approvals and permitting. 
 

 US$71m  Ewoyaa sale completed1  Outcome  Sold all rights and interests in Ewoyaa, including offtake rights, to Zhejiang Huayou Cobalt  Completed 26 October 2026 after Ghanaian government approvals; cash consideration before fees and taxes  Proceeds received after quarter end and not included in 30 September 2026 cash balance  Removes future development funding obligations and JV complexity  A$16m  Tabba Tabba tenement sold2  Consideration from Wildcat  Sale of pegmatite rights over exploration license E45/2364  A$5m cash on completion and A$8m in Wildcat shares, with shares sold for A$9m  A$3m deferred cash, payable in April 2027  Contingent A$0.70/t payment on any JORC pegmatite Mineral Resource announced within the tenement  4  WA projects proposed for the Morella Lithium JV3  Proposed terms (non-binding)  Deep Well, Mt Dove, Station Peak and Mount Satirist  Morella can earn 51% by spending A$300k within two years of a definitive agreement; Elevra retains 49%  Morella funds exploration and tenure costs during the earn-in, removing standalone exploration costs  Subject to definitive documents and any required shareholder and regulatory approvals  Portfolio Optimisation  Divesting non-core assets to concentrate on North American development  ELEVRA LITHIUM  9  See ASX release “Elevra Lithium Announces Agreement to Sell Ewoyaa Project Interest” dated 11 May 2026 and “Elevra Lithium Completes Sale of Ewoyaa Project Interest” dated 26 October 2026. Cash consideration is approximately US$71m before fees and taxes.  See ASX release “Elevra Completes Sale of E45/2364 Pegmatite Rights” dated 7 August 2026.  See ASX release “Proposal to Expand Morella Joint Venture” dated 20 August 2026. The proposal is an indicative, non-binding term sheet and there is no certainty that a definitive agreement will be signed or that the transaction will complete. 
 

 Commercial Strategy  Targeting a diversified, market-linked and flexible sales portfolio as NAL volumes expand  ELEVRA LITHIUM  10  Strategic Offtake Partnerships  01 02  Targeting 2-3 core offtake customers  Diversified customer base across geographies, end markets and trading counterparties  Deeper strategic partnerships  Market-Based Pricing Framework  Spot-linked pricing using recognised Spodumene SC6 indices  Current market capture by removing legacy lagging pricing formulas  Lower margin leakage through reduced intermediary exposure  03  Commercial Flexibility  3–5 year contract terms  Incremental volume offered to core customers as production grows  Spot-market balance captures upside exposure  Binding agreement with a leading global battery manufacturer  Annual volumes ramp from 30kt to 90kt; up to  90kt optional  Market-linked pricing adjusted for lithium content  LG Energy Solution1  240,000 dmt  binding supply over 3 years  Mangrove Lithium2  Binding agreement to supply a local converter, reducing logistics costs  Price floor set above expected production cost with no ceiling  Conditional upon Mangrove achieving positive FID by 31 December 2028  7 + 7 years  Initial term plus renewal  See ASX release “Spodumene Supply Agreement signed with LG Energy Solution” dated 8 October 2026.  See ASX release “Binding Agreement concluded with Mangrove Lithium” dated 21 August 2026. 
 

 Mr. Allan Buckler and Mr. Jorge Beristain have volunteered to resign from the Board of  Directors, with their resignation taking effect from the conclusion of the Company’s 2026  Annual General Meeting.1  Experienced and Diverse Board and Management  Dawne Hickton  Chair  Christina Alvord  Director  Lucas Dow Managing Director & CEO  Jeff Armstrong  Director  Laurie Lefcourt  Director  Allan Buckler  Director  Jorge M. Beristain  Director  ELEVRA LITHIUM  11  James Brown  Director  Lucas Dow  Managing Director & CEO  Monique Parker  Chief Sustainability  Officer  Dylan Roberts  General Counsel &  Company Secretary  Sylvain Collard  President Canada & Group COO  Andrew Barber  Chief Development & Investor Relations Officer  Sandra Tremblay  Chief People Officer  Malissa Gordon  Vice President, Government Affairs US  Christian Cortes  Chief Financial Officer  Stéphanie Lemieux  Vice President, Corporate Affairs Canada  Board of Directors (reducing to six at AGM) Management Team  1. See ASX release “Elevra Announces Planned Board Transition” dated 16 October 2026. 
 

 Operations & Growth Projects 
 

 NAL Operational Performance  Record mining and milling performance and strong utilisation delivered a 14% reduction in unit operating cost sold  ELEVRA LITHIUM  13  57%  58%  62%  67%68%67%68%69%  73%  69%  62%  66%  71% 70%  51%  71%  72%  75%  73%  83%  91% 90%  80%  93%  87%  89%  94%  92%  91%  NAL Global Recovery & Mill Utilisation  100%  50%  60%  70%  80%  90%  3.5  29.6  34.2  31.5  40.4  49.7  52.1  50.9  43.3  58.5  52.0  44.2  47.3  54.554.9  806  894  837 830  791  818 812  908 884 907  780  Concentrate Produced & Unit Cost Sold  90  1,008996  80  0  100  200  300  400  500  600  700  800  900  1000  1100  20  Third consecutive quarter will mill  utilisation above 90%.  40% 43%  10  Recovery held at 70%, in line with Q4FY26, supported by higher feed grade and good ore sorting performance.  30%  Global Recovery (%)  0  Mill Utilisation (%)  30  40  50  60  70  Concentrate Production (kdmt)  Unit Operating Costs Sold (US$/dmt FOB)  Record throughput and strong production drive reduced unit costs  ~55k dmt of spodumene concentrate produced at 5.1% grade the second-highest quarterly production on record.  Unit operating cost of US$780/t sold, down 14% quarter-over-quarter reflecting higher sales volumes and lower processing costs.  Record ore mined of 466kt and mill throughput of 365kt. 
 

 Growth Projects  A unique North American investment opportunity with a cornerstone operating asset and strategic growth projects  14  See ASX release “FY26 Full Year Results Announcement” released 28 August 2026. FY27 production guidance based on an SC5.2 product grade.  See ASX release “NAL Expansion Pre-Feasibility Study” released 7 September 2026 and all material assumptions underpinning the production target and forecast financial information continue to apply and have not materially changed. Figures converted at CAD/USD = 1.35.  1.  ELEVRA LITHIUM 2.  3. ASX release “Moblan increases Resource to 121Mt and Reserves to 48Mt” on 25 August 2025 and all material assumptions underpinning the production target and forecast financial information continue to apply and have not materially changed..  NAL Expansion  (100%)  Leading North American open pit mining operator producing 198-210kt1 of spodumene concentrate in FY27, with expansion to increase capacity to 373kt2  Brownfield expansion Pre-Feasibility Study completed with strong economics  Staged expansion opportunity to increase annual production and reduce unit costs  Competitive capital returns with estimated expansion capex of US$271 million2  Moblan  (60%)  High-grade, long-life project located close to key infrastructure and transport nodes with production target of 300kt per annum of spodumene concentrate  Drilling program achieved 6.5x increase in Resource base since acquisition; Measured, Indicated and Inferred Mineral Resource of 121Mt @ 1.19% Li2O3  Strategically located at the southern most portion of the James Bay region of Quebec  Funded for key pre-development activities to enable FID  Fully-integrated, strategically located asset designed to produce battery-grade lithium chemicals  Carolina  (100%)  Received mining permit for construction, operation and reclamation in May 2024  One of only two significant spodumene projects in the U.S.  Expected to benefit from exceptional infrastructure and close proximity to end customers 
 

 Lower Unit Costs  Increased Scale  Capital Efficient Expansion  Strengthens NAL’s position as a  cornerstone asset in North America  Larger production base increases commercial flexibility and partnership opportunities  Throughput expansion structurally lowers operating cost per tonne  Lower cost base improves margins and cash flow resilience across lithium price cycles  Existing infrastructure enables high-return growth with limited incremental capital intensity  Faster development timeline accelerates value creation  NAL Expansion Transforms Elevra into a Larger, Lower Cost Producer  Expanded output and lower unit costs create a pathway to improved cash flow generation  See ASX release “NAL Expansion Pre-Feasibility Study” released 7 September 2026 and all material assumptions underpinning the production target and forecast financial information continue to apply and have not materially 15  ELEVRA LITHIUM 1.  changed. Figures converted from Canadian dollars to United States dollars using USD/CAD = 1.35 as per PFS.  2. May-26 Scoping figures based on the ASX release “Updated NAL Expansion Scoping Study” released 12 May 2026. Figures converted from Canadian dollars to United States dollars using USD/CAD = 1.35 as per Scoping Study.  Higher production and lower unit costs materially expand cash flow generation potential  Improved margin durability offers resilience through commodity price cycles  1,684  2,384  Base Case  Post Expansion  Total Project NPV  8%  (post-tax)  US$M1  +42%  Average Annual NAL Production Capacity  Average LOM SC5.4 (post expansion)1,2, kdmt  C1 Cost of Concentrate  Average LOM (post expansion) US$/dmt  1,2  Long-term value creation  68  75  Total Initial Capex  US$M1,2  270  128  271  Post Expansion (May-26 Scoping)  Post Expansion (PFS)  199  338  373  Base Case  Post Expansion  (May-26 Scoping)  Post Expansion  (PFS)  +87%  774  628  630  Base Case  Post Expansion Post Expansion (May-26 Scoping) (PFS)  (19%)  Stage 3  Stage 2  Stage 1 
 

 Debottlenecking steps  Capital cost2  Uplift  Stage 1  Mill Optimisation  Optimise the existing 4,500tpd circuit through targeted upgrades to milling, desliming, magnetic separation, flotation and dewatering  Add stacksizers, magnetic separation capacity and flotation/conditioning improvements  Install new dewatering and concentrate handling infrastructure  C$92M (US$68M)  ↑ ~35ktpa3 increase in annual spodumene production  (+15-20% increase)  Stage 2  Mill Expansion  Increase milling throughput to 6,500tpd  Add a second grinding circuit and expand downstream magnetic separation and flotation capacity  Utilise a temporary contract crushing circuit to support incremental feed requirements  C$101M (US$75M)  ↑ ~104ktpa4 incremental production increase to 338ktpa average annual production post-expansion  Stage 3  Full Production  Improve feed quality and crushing efficiency while maintaining 6,500tpd milling capacity  Replacement of temporary contract crushing with a new permanent crushing circuit  Repurpose existing crusher as a dedicated ore-sorting facility and install XRT ore sorters  C$173M  (US$128M)  ↑ ~35ktpa4 incremental production increase to 373ktpa average annual production with crushing and ore sorting cost efficiencies  Targeted Debottlenecking Unlocks Significant Production Growth at NAL  Staged NAL Expansion progressively increases production and lowers unit costs1  ELEVRA LITHIUM  16  See ASX release “NAL Expansion Pre-Feasibility Study” released 7 September 2026 and all material assumptions underpinning the production target and forecast financial information continue to apply and have not materially changed.  Figures converted from Canadian dollars to United States dollars using CAD/USD = 1.35 as per NAL Expansion Pre-Feasibility Study.  Production increase based on Process Design Criteria uplift to NAL Base Case production capacity of 199ktpa.  ~139kpta (SC5.4) incremental production increase from Stages 2 and 3 calculated as 373ktpa expansion capacity minus Base Case 199ktpa capacity plus 35ktpa uplift from Stage 1 of expansion.  Proposed dates and timing is indicative and are the current target of Elevra.  Scoping Study  Project Evaluation  Pre-Feasibility Study  Stage 1 – Mill  Optimisation  Stage 2 – Mill  Expansion  Stage 3 – Full  Production  Completed  Completed  Completed Mid CY275 Mid CY285 Mid CY295 
 

 Parallel Execution Accelerates NAL’s Path to Full Production  Engineering, capital deployment and construction are staged to accelerate delivery1  ELEVRA LITHIUM  17  1. See ASX release “NAL Expansion Pre-Feasibility Study” released 7 September 2026. Proposed dates and timing is indicative and are the current target of Elevra.  Stage 1  Stage 2  Stage 3  Permitting advances in parallel with project execution:  Stage 1: Operations within existing 4,500tpd milling permit  Stage 2: Permitting to align mining and milling capacity to 6,500tpd and TSF infrastructure  Stage 3: Additional approvals required for expanded mine, TSF and waste rock infrastructure  Early procurement supports overlapping construction:  Long Lead Items for Stages 1 & 2 to be procured early  Stage 2 construction progresses during Stage 1 ramp  Stage 3 establishes permanent crushing and ore sorting infrastructure  Detailed Engineering  Procurement  Long Lead Items  Construction  Commissioning  Permitting  Illustrative schedule reconstructed from the NAL Expansion Pre-Feasibility Study indicative timeline.  Mid CY27  Mid CY28  Mid CY29 
 

 Moblan  Mineral Resource and Ore Reserve growth creates opportunity to evaluate increased annual production  ELEVRA LITHIUM  18  See ASX release “Moblan Lithium Project Definitive Feasibility Study: Positive Results Deliver C$2.2B NPV” dated 20 February 2024 and all material assumptions underpinning the production target and forecast financial information continue to apply and have not materially changed..  See ASX release “Moblan Increases Resource to 121Mt and Reserve to 48Mt” dated 25 August 2025 and all material assumptions underpinning the production target and forecast financial information continue to apply and have not materially changed..  2024 Definitive Feasibility Study1  Key Outcomes  300,000t  Average annual 6% Li2O production  US$417/t  Unit operating cost  US$1.6B  Post-tax NPV8%  2.3 : 1  Average LOM strip ratio  34.5Mt  Ore Reserve Estimate  US$561/t  AISC  34%  Post-tax IRR  70.9Mt  Mineral Resource Estimate  Moblan Mineral Resources and Ore Reserves1,2  6.3  6.3  43.6  101.4  21.0  13.3  70.9  121.0  Moblan DFS (Feb. 2024)  Current Estimate (Aug. 2025)  Measured Indicated Inferred  +71%  5.3  34.5  42.8  34.5  48.1  Moblan DFS (Feb. 2024)  Current Estimate (Aug. 2025)  Proved Probable  +39%  Growing resource base creates an opportunity to unlock greater production  Moblan’s Mineral Resource and Ore Reserves have grown significantly since the 2024 Definitive Feasibility Study.  The expanded resource base provides an opportunity to evaluate a higher production rate than previously contemplated.  Elevra is undertaking an updated Scoping Study to assess the optimal development scale and incorporate the significant growth in the resource and reserve base.  Updated study work is focused on maximising the value of Moblan while maintaining a disciplined approach to capital and project execution. 
 

 Moblan  Well positioned to become Canada’s next spodumene producer with a funded pathway to FID  ELEVRA LITHIUM  19  See ASX release “Strategic Funding Presentation” dated 12 May 2026.  Shaakichiuwaanaan Mineral Resource Estimate based on PMET Resources release “PMET Increases Grade and Scale of Caesium Mineral Resource at Shaakichiuwaanaan” dated 3 November 2026. Ore Reserve Estimate,  Feasibility Study and Upcoming Milestones based on PMET Resources September 2026 Corporate Presentation.  Rio Tinto Mineral Resource Estimate, Ore Reserve Estimate, and Feasibility Study dates based on ASX filing “Initial reporting of lithium Mineral Resources and Ore Reserves” dated 4 December 2025. Upcoming Milestones included in ASX filing “Rio Tinto releases third quarter 2026 production results” dated 14 October 2026.  Moblan development pathway1  As part of the May 2026 Strategic Financing Package, Elevra secured funds to advance Moblan to a Final Investment Decision.  Pre-FID activities:  Progress baseline environmental studies  Progress permitting activities  Hydrogeological and geotechnical drilling  Further metallurgical sampling and test work  Review and update of the 2024 DFS to incorporate:  Larger Mineral Resource and Ore Reserve base compared to the 2024 DFS  Removal of discounted sales under offtake agreement purchased and canceled by Elevra  Moblan  (Elevra 60% / IQ 40%)  Shaakichiuwaanaan2  (PMET Resources)  Whabouchi3  (Rio Tinto 54% / IQ 46%)  Galaxy3  (Rio Tinto)  Mineral Resource Estimate  Measured: 6.3Mt @ 1.50% Indicated: 101.4Mt @ 1.19% Inferred: 13.3Mt @ 1.06%  Measured: --  Indicated: 113.9Mt @ 1.43%  Inferred: 33.7Mt @ 1.24%  Measured: --  Indicated: 18.7Mt @ 1.51%  Inferred: 8.3Mt @ 1.31%  Measured: --  Indicated: 18.1Mt @ 1.12%  Inferred: 55.9Mt @ 1.29%  Ore Reserve Estimate  Proved: 5.3Mt @ 1.57%  Probable: 42.8Mt @ 1.27%  Proved: --  Probable: 84.3Mt @ 1.26%  Proved: 10.5Mt @ 1.40%  Probable: 16.0Mt @ 1.27%  Proved: --  Probable: 37.3Mt @ 1.27%  Feasibility Study  DFS completed Feb 2024; updated Scoping Study in Q4 CY26  Feasibility study completed Oct 2025  Pre-Feasibility study updated in 2023  Feasibility study completed in 2022 and updated in 2023  Upcoming Milestones  Funded to FID via Strategic Funding Package  Updated Feasibility Studies expected Q4 2026; FID expected in H2 2027  Development of Whabouchi and Galaxy remain subject to a review to determine which of the two mines will be developed. A decision is expected in Q4 2026.  Elevra is North America’s largest hard-rock lithium producer with proven, in-region execution capability. Moblan is a major deposit with a completed DFS, growing reserves and is funded for pre-development activities through to FID. 
 

 Guidance 
 

 FY27 Guidance  See ASX release “September 2026 Quarterly Activities Report” dated 27 October 2026.  See ASX release “FY26 Full Year Results Announcement” dated 28 August 2026. Guidance assumes average annual exchange rates of CAD:USD = 0.74 and AUD:USD = 0.71.  Unit operating cost sold is calculated on an accruals basis and includes mining, processing, transport, port charges, site-based general and administration costs and cash-based inventory movements, and excludes depreciation and amortisation charges, freight and royalties. It is reported in US$/dmt sold, FOB Port of Québec.  FY27 Capital expenditure guidance excludes movements in capital creditors which amounted to US$3m at June-26  ELEVRA LITHIUM  21  Spodumene Concentrate Production  Spodumene Concentrate Sales  Unit Operating Costs Sold 3  SC 5.2% product grade  100% NAL production  SC 5.2% product grade  Volumes modestly front-weighted utilising existing inventory (55% H1, 45% H2)  SC 5.2% product grade   Increase in FY27 due to inflation, FX translation, higher strip ratio (10:1), and pre-strip works in mining Phase 4 in anticipation of the NAL Brownfield Expansion.  198,000 – 210,000  dmt  Additional Information  FY27 Guidance 2  Capital  Expenditures 4   US$100-120m growth capital allocated to the NAL Expansion and advancement of Moblan studies  US$20m of sustaining capital projects at NAL.  200,000 – 230,000  dmt  US$880 – US$950  / dmt sold  US$120-140m  54,907 dmt  Q1 FY27 Actual 1  58,134 dmt  US$780 / dmt sold  US$9m 
 

 Appendix 
 

 ELEVRA LITHIUM  23  Asset  Source (ASX release)  Reserve Category  Tonnes (Mt)  Li2O Grade (%)  Cut-off Grade (%Li2O)  Elevra Lithium 2026 Annual Report  28 August 2026  Competent Person: Mr Tony O’Connell  Proved Ore Reserves  0.2  0.93  0.60  North American Lithium  Probable Ore Reserves  47.0  1.12  0.60  Total  47.2  1.12  0.60  Moblan Increases Resource to 121Mt and Reserve to 48Mt  28 August 2026  Competent Person: Mr Tony O’Connell  Proved Ore Reserves  5.3  1.57  0.60  Moblan  Probable Ore Reserves  42.8  1.27  0.60  Total  48.1  1.31  0.60  Supporting Data  Combined Lithium Ore Reserve Totaling 76Mt1,2  All estimates in table shown on 100% Basis. Note Moblan is 60% owned by Elevra.  Elevra is not aware of new information or data that materially affects the estimates, and that all material assumptions and technical parameters continue to apply and have not materially changed. The form and context of  the CP findings have not been materially modified. 
 

 ELEVRA LITHIUM  24  Asset  Company  Location  Status  Code  Source  Date  Measured  (Mt)  Measured (% Li2O)  Indicated  (Mt)  Indicated (%Li2O)  Total M+I  (Mt)  M+I (%Li2O)  M+I Inclusive of Reserves  Inferred  (Mt)  Inferred (%Li2O)  North American Lithium  Elevra Lithium  Québec, Canada  Operating  JORC  Company Filing (2026 Annual Report)  28-08-26  -  -  74.4  1.2%  74.4  1.2%  Yes  18.9  1.1%  Moblan  Elevra Lithium (60%); IQ (40%)  Québec, Canada  Non-Operating  JORC  Company Filing (2026 Annual Report)  28-08-26  6.3  1.5%  101.4  1.2%  107.7  1.2%  Yes  13.3  1.1%  Kings Mountain  Albemarle  North Carolina, U.S.  Non-Operating  S-K 1300  Albemarle 10-K (2025)  31-12-25  -  -  63.9  1.4%  63.9  1.4%  No  27.6  1.2%  Galaxy  Rio Tinto  Québec, Canada  Non-Operating  JORC  Company Filing (Initial reporting of  lithium Mineral Resources and Ore  Reserves)  4-12-25  -  -  18.1  1.1%  18.1  1.1%  No  55.9  1.3%  Whabouchi  Rio Tinto (54%); IQ (46%)  Québec, Canada  Non-Operating  JORC  Company Filing (Initial reporting of lithium Mineral Resources and Ore Reserves)  4-12-25  -  -  18.7  1.5%  18.7  1.5%  No  8.3  1.3%  PAK  Frontier Lithium (92.5%); Mitsubishi  (7.5%)  Ontario,  Canada  Non-Operating  NI 43-101  Company Filing (NI 43-101 Technical  Report)  9-07-25  16.4  1.6%  20.5  1.5%  36.9  1.6%  Yes  18.6  1.5%  Shaakichiuwaanaan  PMET Resources  Québec, Canada  Non-Operating  NI 43-101  Company Filing (PMET Increases Grade and Scale of Caesium Mineral Resource at Shaakichiuwaanaan Project)  3-11-26  -  -  113.9  1.4%  113.9  1.4%  Yes  33.8  1.2%  Adina  Li-FT Power  Québec, Canada  Non-Operating  JORC  Company Filing (Adina Mineral Resource Increases 33% to 78Mt at 1.15% Li2O)  28-05-24  -  -  61.4  1.1%  61.4  1.1%  Yes  16.5  1.2%  Yellowknife  Li-FT Power  Northwest Territories, Canada  Non-Operating  NI 43-101  Company Filing (Initial Mineral Resource Estimate for the Yellowknife Lithium Project)  1-10-24  -  -  -  -  -  -  Yes  50.4  1.0%  Rose  Critical Elements  Ontario,  Canada  Non-Operating  NI 43-101  NI 43-101 Feasibility Study Technical  Report (Rose FS)  11-10-23  -  -  30.6  0.9%  30.6  0.9%  Yes  2.4  0.8%  Separation Rapids  Sibelco  Ontario, Canada  Non-Operating  NI 43-101  Company Filing (Avalon Advanced Materials Announces 28% Increase in Measures and Indicated Mineral Resources at JV Separation Rapids Project in Ontario Canada)  30-01-25  4.3  1.3%  8.7  1.4%  13.0  1.3%  Yes  2.3  1.5%  Georgia Lake  Rock Tech Lithium  Ontario,  Canada  Non-Operating  NI 43-101  Company Filing (Georgia Lake  Pre-Feasibility Study)  1-10-22  -  -  10.6  0.9%  10.6  0.9%  Yes  4.2  1.0%  Cisco  Q2 Metals  Québec, Canada  Non-Operating  NI 43-101  Company Filings (Q2 Metals Announces Inferred Mineral Resource Estimate on the Cisco Lithium Project)  20-04-26  -  -  -  -  -  -  -  294.7  1.4%  Supporting Data (continued)  A Leading Hard Rock Resource Base in North America Totalling 166Mt1  1. All estimates in table shown on 100% Basis. Note Moblan is 60% owned by Elevra. 
 

 Supporting Data  Uplift in Pricing with Strong Demand Outlook into 2030  ELEVRA LITHIUM  25  Spodumene Concentrate 6% Price (US$/t)  Est. Date  2026  2027  2028  2029  2030  Broker 1  Oct-26  2,012  2,043  2,048  1,785  1,680  Broker 2  Oct-26  2,201  2,300  1,100  1,675  1,575  Broker 3  Oct-26  2,187  1,820  2,000  2,100  2,100  Broker 4  Oct-26  2,290  2,600  -  -  -  Broker 5  Oct-26  2,193  2,400  2,000  1,910  1,766  Broker 6  Sep-26  2,190  1,690  1,253  1,503  1,625  Broker 7  Oct-26  -  1,750  1,900  2,100  -  Consensus Average  2,179  2,086  1,717  1,846  1,749  Global Lithium Demand (kt LCE)  Est. Date  2026  2027  2028  2029  2030  Broker 1  Oct-26  2,108  2,324  2,510  2,634  2,750  Broker 2  Oct-26  2,030  2,329  2,573  2,829  3,074  Broker 3  Oct-26  1,809  2,103  2,437  2,858  3,140  Broker 4  Oct-26  1,994  2,358  -  -  -  Broker 5  Oct-26  2,144  2,598  2,991  3,337  3,619  Broker 6  Sep-26  2,048  2,178  2,515  2,901  3,228  Consensus Average  2,022  2,315  2,605  2,912  3,162  Consensus Max  2,144  2,598  2,991  3,337  3,619  Consensus Min  1,809  2,103  2,437  2,634  2,750  Consensus includes estimates from Benchmark Mineral Intelligence, Barrenjoey, Canaccord, Fastmarkets, J.P. Morgan, Macquarie and UBS. 
 

 


Filing Exhibits & Attachments