UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
Form 6-K
REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934
For the month of October 2025
Commission File Number 001-42819
ELEVRA LITHIUM
LIMITED
(Translation of registrant’s name into English)
Level 28,
10 Eagle Street
Brisbane, Queensland 4000
Australia
(Address of principal executive office)
Indicate by check mark whether the registrant files or will file annual
reports under cover of Form 20-F or Form 40-F.
Form 20-F x Form 40-F ¨
29
October 2025
Quarterly
Activities Report
September 2025
Elevra
Lithium completed its transformational merger while maintaining a high level of production at NAL.
Merger
| · | Sayona
Mining Limited and Piedmont Lithium Inc. completed the previously announced merger on 30
August 2025 (AEST) / 29 August 2025 (ET) with overwhelming shareholder support. |
| · | Concurrent
with closing of the merger, the Company completed a $69 million (before costs) placement
to Resource Capital Fund VIII, L.P. |
| · | Following
the completion of the merger, the Company was renamed Elevra Lithium Limited and effected
a 150-to-1 share consolidation for ordinary shares traded on the Australian Securities Exchange
(ASX). |
| · | The
merger enables a unified development strategy across an expanded portfolio of high-quality
assets to emerge as the premier North American hard-rock lithium producer. |
North
American Lithium
| · | The
September 2025 quarter saw the best safety performance since the restart of operations
in 2023. |
| · | Ore
mined of 338,341 wet metric tonnes (wmt) was 7% lower quarter on quarter (QoQ) to align with
mill production. |
| · | Process
plant utilisation remained strong at 87%, which was a 6% decline QoQ due to a combination
of planned and unplanned downtime compared to the prior quarter in which there was no planned
maintenance. The root cause of the unplanned downtime was identified and corrected to prevent
a recurrence. |
| · | Lithium
recovery for the quarter was 69%, down 4% QoQ based on a lower feed grade and increased use
of the WHIMS (wet high intensity magnetic separators) in response to higher iron content
in feed material. |
| · | Strong
spodumene production of 52,003 dry metric tonnes (dmt) at an average grade of 5.2%, down
11% QoQ as a result of lower plant utilisation and recoveries compared to the record levels
seen in Q4 FY25. Despite the QoQ reduction, this marked the third best quarterly production
since operations began. |
| · | Spodumene
sales were 25,975 dmt for the September 2025 quarter, in line with prior guidance. Sales
are deliberately weighted toward the December quarter, with inventory built to facilitate
the planned uplift in sales volume which will be delivered into higher priced forward sales
prices. |
| · | The
average realised selling price (FOB) increased by 14% to $1,198/dmt (US$784/dmt) versus the
prior quarter, reflecting the benefit of improved spot market prices and Elevra's strategy
to manage market price risk through forward sales arrangements. |
| QUARTERLY ACTIVITIES REPORT • September 2025 | 1 |
| · | Unit
operating costs (per tonne sold) for NAL increased 1% QoQ to $1,250/dmt (US$818/dmt) with
higher mill costs, reduced concentrate sales volumes and increased inventory. |
| · | Capital
expenditure of $13 million for the quarter remains within guidance and was primarily related
to upgrade of the Tailings Storage Facility and other NAL sustaining projects with earth
works planned to be completed in summer period. |
Growth
Projects
NAL
Expansion
| · | The
NAL Expansion Scoping Study outlined a pathway to expand production capacity 55% from 200ktpa
(thousand tonnes per annum) to 315ktpa and reduce unit operating costs ~30% (vs. Q1 FY26)
to approximately US$562/dmt at an attractive capital cost of approximately US$270 million
moving NAL significantly down the cost curve and enabling through-the-cycle profitability. |
| · | The
Scoping Study highlights a compelling uplift in value relative to the base case with post-tax
NPV of C$1,284 million (US$950 million)1 and a 26.4% IRR. |
| · | Initial
environmental baseline studies related to permitting are underway and the Company is working
towards a Final Investment Decision in the second half of 2027, resulting in first production
in 2029. |
Moblan
| · | Moblan
continues to emerge as one of North America's most strategic and attractive lithium resources
following the completion of a 30% increase to the project's JORC-compliant Mineral Resource
Estimate (MRE). |
| · | Baseline
environmental field activities resumed during the September quarter. |
Ewoyaa
| · | Discussions
on the revised fiscal terms of the Mining Lease are ongoing with the Ghanaian government,
with the final terms to be presented to Ghana's Parliament prior to ratification. |
| · | Advancement
of the project remains contingent on Mining Lease ratification, prevailing market conditions
and project financing. |
Carolina
Lithium
| · | Progressed
the outstanding air permit application and North Carolina General Stormwater permit. |
| · | U.S.
policy has strengthened following direct government investments in critical minerals projects,
underscoring growing federal support for domestic supply chains and providing a positive
backdrop for Carolina Lithium's strategic importance. |
Corporate
| · | The
balance of cash and cash equivalents at 30 September 2025 was $148.8 million, a $76.5
million increase over the equivalent balance of $72.3 million at 30 June 2025. Cash
increased due to the receipt of $69 million of proceeds raised through the issuance of new
shares and $52 million of cash from Piedmont at merger completion (net of Piedmont expenditure
from 1 July to 30 August, which included $8 million of merger transaction costs). This
was offset by a $12 million operating cash outflow at NAL, primarily driven by adverse working
capital movements from inventory build, $13 million in capital expenditure, $10 million outflow
from Group operations, and $9 million of merger transaction costs. |
| · | Elevra
reaffirms FY26 production guidance of 195,000-210,000 dmt, FY26 sales guidance of 195,000-210,000
dmt, and unit operating costs (per tonne sold) of $1,175-1,275/dmt.2 |
1
Converted at CADUSD = 0.74 per Scoping Study Results.
2
See “FY26 Guidance” on page 34 of our presentation filed with the ASX on 15 September 2025. All figures AUD unless noted.
| QUARTERLY ACTIVITIES REPORT • September 2025 | 2 |
Management
Commentary
This
quarter represented a pivotal stage in Elevra Lithium's evolution, with the successful completion of the Sayona-Piedmont merger, resource
upgrades, a study on the NAL Expansion, and continued operational and safety gains at NAL.
The
September quarter marked a transformational period for the Company, highlighted by the completion of several major corporate milestones
that established a strong foundation for the next phase of growth.
The
merger between Sayona Mining and Piedmont Lithium was successfully completed with overwhelming shareholder support. The merger enables
a unified development strategy across an expanded portfolio of high-quality assets to emerge as the premier North American hard-rock
lithium producer with global scale, a balanced leadership team, and a strong foundation for long-term shareholder value creation.
Following
completion of the merger, the conditional capital raise with Resource Capital Fund VIII, L.P. was finalised which provided immediate
funding to support near-term growth initiatives and introduced a highly strategic and supportive investor to the shareholder register.
In
parallel, the Company completed a corporate rebranding and began trading under the new name Elevra Lithium Limited. A share consolidation
was also implemented to simplify the capital structure and align Elevra's profile with its expanded presence in international markets.
Operationally,
Elevra continued to deliver progress across its core operational and development assets. Updated Mineral Resource and Ore Reserve estimates
were announced for both North American Lithium and Moblan, with both deposits showing material increases following a highly successful
drill campaign completed in 2024. These results further reinforce the quality of Elevra's resource base and provide a strong platform
for future expansion.
We
also released the NAL Expansion Scoping Study, outlining a compelling pathway to increase the annual production capacity at North America's
most significant source of existing hard-rock lithium production. The study demonstrates technical and economic potential to enhance
value through a capital efficient brownfield development project. Baseline environmental studies related to the expansion are underway
and the Company intends to progress the development to enhance our position as North America's leading hard-rock lithium provider.
An
expansion is only possible due to the continued operational success at NAL, which is a testament to the focus on process optimisation,
operational stability and cost discipline. Despite a modest decline in mill utilisation and recovery, spodumene concentrate production
remained strong at 52,003 dmt. Importantly, safety performance improved meaningfully as a result of ongoing processes intended to implement
structure and minimise the risk of incidents or accidents.
Sales
totalled 25,975 dmt for the quarter at an average realised selling price of $1,198/dmt (FOB).
Looking
ahead, Elevra provided FY26 guidance for spodumene concentrate production, sales and unit operating costs and remains on track to deliver
within our outlook.
Mr
Lucas Dow
Managing Director and CEO
| QUARTERLY ACTIVITIES REPORT • September 2025 | 3 |
Operational
Financial Performance
| | |
Unit | |
Q1 FY26 | | |
Q4
FY25 | | |
QoQ
Variance | | |
YTD
FY26 | | |
YTD
FY25 | | |
YTD
Variance | |
| North American Lithium3 | |
| |
| | | |
| | | |
| | | |
| | | |
| | | |
| | |
| Ore mined | |
wmt | |
| 338,341 | | |
| 361,883 | | |
| (7 | )% | |
| 338,341 | | |
| 240,274 | | |
| 41 | % |
| Recovery | |
% | |
| 69 | | |
| 73 | | |
| (4 | )% | |
| 69 | | |
| 67 | | |
| 2 | % |
| Concentrate produced | |
dmt | |
| 52,003 | | |
| 58,533 | | |
| (11 | )% | |
| 52,003 | | |
| 52,141 | | |
| — | |
| Concentrate grade produced | |
% | |
| 5.2 | | |
| 5.2 | | |
| — | | |
| 5.2 | | |
| 5.3 | | |
| (0.1 | )% |
| Concentrate sold | |
dmt | |
| 25,975 | | |
| 66,980 | | |
| (61 | )% | |
| 25,975 | | |
| 48,992 | | |
| (47 | )% |
| Average realised selling price (FOB)4 | |
$/dmt | |
| 1,198 | | |
| 1,054 | | |
| 14 | % | |
| 1,198 | | |
| 1,067 | | |
| 12 | % |
| Revenue | |
$M | |
| 31 | | |
| 71 | | |
| (56 | )% | |
| 31 | | |
| 52 | | |
| (40 | )% |
| Unit
operating cost sold (FOB)5 | |
$/dmt | |
| 1,250 | | |
| 1,232 | | |
| 1 | % | |
| 1,250 | | |
| 1,335 | | |
| (6 | )% |
| Group | |
| |
| | | |
| | | |
| | | |
| | | |
| | | |
| | |
| Cash balance | |
$M | |
| 149 | | |
| 72 | | |
| 106 | % | |
| 149 | | |
| 104 | | |
| 43 | % |
| AUD : CAD | |
$ | |
| 0.9009 | | |
| 0.8864 | | |
| (2 | )% | |
| 0.9009 | | |
| 0.9136 | | |
| 1 | % |
Health
and Safety
The
Total Recordable Injury Frequency Rate (TRIFR) decreased during the September 2025 quarter, as Elevra delivered its best safety
performance since the restart of operations in 2023 and ended the quarter with 40 consecutive Triple Zero6 days.
No
lost time injuries were recorded during the quarter, marking five consecutive months without a lost time injury, and recordable injuries
decreased significantly.
The
improvement in safety outcomes has been driven by targeted initiatives focused on identifying trends and recurring events, enabling teams
to take preventative action before incidents occur. On-site engagement has been strengthened through structured processes that promote
proactive and collaborative safety management across teams. These improvements have fostered greater ownership and accountability at
all levels in supporting Elevra's continued focus on ensuring the health and well-being of our employees.
3
All figures are reported in 100% terms. Numbers presented may not add up precisely to the
totals provided due to rounding.
4
Average realised selling price is calculated on an accruals basis and reported in $/dmt sold, FOB Port of Québec.
5
Unit operating cost sold is calculated on an accruals basis and includes mining, processing, transport, port charges, site-based general
and administration costs and cash based inventory movements, and excludes depreciation and amortisation charges, freight and royalties.
It is reported in $/dmt sold, FOB Port of Québec.
6
Triple Zero refers to the health and safety objective of zero lost time injuries, zero modified duty injuries, and zero medical aid injuries.
| QUARTERLY ACTIVITIES REPORT • September 2025 | 4 |
ESG
and Community Engagement
Elevra
progressed several studies required to support the potential NAL expansion and development of Moblan during the September quarter.
A series of activities were also launched to complete a self-declaration for the Towards Sustainable Mining initiative, demonstrating
a commitment to responsible and sustainable mining practices as outlined by the Mining Association of Canada.
Elevra
also finalised an agreement for the restoration of the Double Marsh dike to fully offset fish habitat losses associated with the NAL
site reopening. The project is being completed in collaboration with Ducks Unlimited Canada and is intended to support the local community.
North American Lithium
Mining
Ore
mined of 338,341 wmt was 7% lower than the previous quarter.
Mine
operations during the quarter remained aligned with mill production and were supported by use of existing ore inventories. Ore mined
was broadly consistent with the prior period, while a high broken rock inventory at the start of the quarter allowed Elevra to optimise
production by reducing drilling and blasting activity to rebalance stockpile levels.
The
transition from Phase 2 to Phase 3 mining was completed during the quarter, marking an important milestone in the life of mine plan.
Phase 3 features a higher strip ratio due to the historical underground stopes contained within Phase 3, resulting in increased waste
movement to access ore. This increase has been accounted for in FY26 guidance.
The
feed grade of ore delivered to the ROM stockpile averaged 1.14% Li2O for the quarter, which was slightly below the previous
quarter.
Production
Production
remained strong at 52,003 dmt of spodumene concentrate at an average grade of 5.2% for the quarter.
The
mill processed 341,780 tonnes of ore (down 4% QoQ) at an average feed grade of 1.15% Li2O.
Mill
utilisation was 87%, a decline of 6% QoQ largely due to planned shutdowns during the quarter compared to no planned shutdowns in the
prior quarter. Some unplanned downtime occurred with power and PLC communication issues in the process plant. The primary cause of these
issues was identified and corrected during the quarter.
| QUARTERLY ACTIVITIES REPORT • September 2025 | 5 |
The
Li2O recovery for the quarter was 69%, consistent with levels seen throughout FY25, with continued operational discipline
and process optimisation offsetting a reduction in Li2O feed grade and higher iron content.
NAL
Global Recovery and Mill Utilisation
Figure
1: NAL Global Recovery and Mill Utilisation
NAL
Concentrate Production and Unit Operating Costs
Figure
2: NAL Concentrate Production and Unit Operating Costs (sold)
| QUARTERLY ACTIVITIES REPORT • September 2025 | 6 |
Sales
NAL
revenue was $31 million for the September 2025 quarter, which reflected the planned lower sales volumes partially offset by higher
average realised selling prices.
The
decrease in revenue resulted from a 61% decrease in spodumene concentrate tonnes sold by NAL following a record June 2025 quarter.
Shipments have been deliberately weighted to the December quarter to access higher forward sales prices (see prior guidance on Q1/Q2
sales volumes at ~25%/~75% in ASX release 15 September 2025).
Total
spodumene concentrate sold during the September 2025 quarter was 25,975 dry metric tonnes, with one marine cargo departing port
during the quarter to a North American customer.
A
14% increase in average realised selling price (FOB) to $1,198/dmt (US$784/dmt) helped to offset the planned reduction in sales volumes.
Elevra's strong price realisation came amidst news of supply-side reviews which caused multiple operations to halt production during
the September quarter, which improved market conditions and drove lithium prices higher.
A
total of 51,041 tonnes of spodumene concentrate finished goods was stockpiled at NAL, in transit or at the Port of Québec as at
30 September 2025, an increase of approximately 26,000 tonnes compared to June 2025. This level of inventory will allow Elevra
to execute against the strategy of delivering into higher sales prices through forward sales arrangements in the December quarter.
Costs
Unit
operating costs (FOB) for NAL increased 1% Quarter on Quarter to $1,250/dmt sold (US$818/dmt sold) reflecting a decline in tonnes sold,
higher mill costs and an increase in inventory.
Total
ore mining and waste stripping costs declined 12% QoQ with a reduction in tonnes of ore mined mitigated by an 11% QoQ increase in total
material moved due to higher waste stripped and mined.
A
5% increase in ore processing expenditure for the September 2025 quarter was primarily related to planned shutdowns in both the
crusher and mill.
In-pit
and ROM inventory at the end of the September 2025 quarter was materially lower than the prior quarter while finished goods inventory
increased by approximately 100% QoQ to facilitate a significant increase in planned shipments in the December quarter. Elevra has
commenced stockpiling additional crushed ore on the ROM pad and crushed ore dome to mitigate potential weather impacts during winter,
with the stockpile serving as a buffer between the crushing circuit and the mill.
Unit
operating costs per tonne produced (FOB) increased 3% over the quarter to US$760/dmt; reflective of the lower production due to planned
shutdowns.
| QUARTERLY ACTIVITIES REPORT • September 2025 | 7 |
Growth Projects
NAL
Brownfield Expansion
NAL
Expansion Scoping Study confirms lower costs and strong economic case for expansion of annual production.
On
15 September 2025, Elevra released the NAL Expansion Scoping Study. The study contemplates a brownfield growth opportunity designed
to increase throughput and showed improved project economics. The study evaluated an expansion of the process plant feed rate from 4,200
tonnes per day (tpd) to 6,500tpd, delivering an average annual production of approximately 315,000 tonnes of spodumene concentrate at
5.4% Li2O with life of mine recoveries of 71.2%, supported by recent operational efficiencies and process optimisation. The
expansion scenario utilised the 30 June 2025 Ore Reserves of 48.6 million tonnes at 1.11% Li2O.
The
Scoping Study highlights a compelling uplift in value relative to the base case with post-tax NPV of C$1,284 million (US$950 million)7
and a 26.4% IRR. Initial capital expenditure is estimated at C$366 million (US$270 million)8. Operating costs are
projected to decline meaningfully with C1 cash costs of C$759/t (US$562/t)8 and all-in sustaining costs of C$920/t
(US$681/t)8, positioning NAL to operate across market cycles.
By
leveraging existing site infrastructure, Elevra can pursue an accelerated development schedule while minimising execution risk. Initial
environmental baseline studies related to permitting are underway and the Company is working towards a Final Investment Decision in the
second half of 2027, resulting in first production in 2029.
7
Converted at CADUSD = 0.74 per Scoping Study Results.
8
Converted at CAD/USD = 0.74
| QUARTERLY ACTIVITIES REPORT • September 2025 | 8 |
Moblan
In
August 2025, an updated Mineral Resource Estimate (MRE) was completed for Moblan which demonstrated a total estimated JORC Measured, Indicated
and Inferred Mineral Resource of 121.0 million tonnes @ 1.19% Li2O at a cut-off grade of 0.55% Li2O.
This
MRE includes 48.1 million tonnes @ 1.31% Li2O of Ore Reserves, a significant 39% increase compared to the previous estimate
release 20 February 2024, which may support higher production and/or longer mine life relative to previous disclosures.
The
updated MRE reflects the integration of the drilling results from the 2024 program and reinforces Moblan as one of North America's largest
hard-rock resources in a favourable location for future development and operation.
Ewoyaa
Negotiations
related to revised fiscal terms of Ewoyaa's Mining Lease are ongoing, and the outcome of the negotiations will be presented to Ghana's
Parliament ahead of ratification of the Mining Lease. The revised terms seek to align the fiscal terms of the Mining Lease with lithium
market dynamics to ensure that the project creates long-term value for all stakeholders.
Development
of Ewoyaa remains subject to ratification of the Mining Lease, prevailing market conditions and attainment of suitable project financing.
Carolina
Lithium
During
the September quarter, Elevra continued to advance the outstanding Carolina Lithium permits with the relevant North Carolina permitting
agencies. The Company maintained its focus on progressing these critical permits while strategically allocating resources to areas where
they could deliver the most immediate impact, ensuring efficient use of capital.
The
U.S. government's recent investments in major critical mineral projects underline a sustained policy drive to secure domestic supply
chains and reinforce the government's willingness to de-risk domestic production. We view this environment as a potential opportunity
for Elevra as we focus on providing a secure and reliable source of lithium to meet growing demand.
| QUARTERLY ACTIVITIES REPORT • September 2025 | 9 |
Corporate
Completed
Merger between Sayona Mining and Piedmont Lithium
On
30 August 2025 (AEST), Sayona Mining and Piedmont Lithium completed the merger following the receipt of requisite approval by shareholders
of both companies and the satisfaction of all closing conditions. In connection with the merger, holders of Piedmont Lithium common stock
and Chess Depositary Interests respectively received American Depositary Shares (ADS) and ASX Ordinary shares in the new company.
A
new Board of Directors was established following the successful completion of the merger. Upon formation, the Board comprised directors
from both predecessor companies. Four directors, including Managing Director and CEO Lucas Dow, were appointed from Sayona Mining and
four directors, including Chair designate Dawne Hickton, were appointed from Piedmont Lithium. The Board was structured to reflect the
combination of the two companies and provides a blend of strategic, technical and commercial skills.
Concurrently,
the Company completed a previously announced conditional capital raise with Resource Capital Fund VIII, L.P. to raise $69 million (before
costs), providing additional funding to support project development and growth initiatives. The merger and capital raise strengthen Elevra's
financial position and create a runway to execute against strategic priorities.
Corporate
Name Change and Share Consolidation
As
the surviving parent company in the merger, Sayona Mining undertook a corporate rebrand to reflect the formation of the new combined
entity, Elevra Lithium Limited. As part of this process, Elevra updated its ASX ticker to ELV and NASDAQ ticker to ELVR to align with
the new corporate identity.
In
conjunction with the name change, Elevra implemented a 150-to-1 share consolidation to rationalise its capital structure and simplify
the Company's ADS ratio. Together with the name change, the share consolidation supports a stronger corporate identity and capital framework
to position Elevra for future growth.
Cash
Cash
and cash equivalents increased by $76.5 million to end the September 2025 quarter at a balance of $148.8 million.
The
Group's cash balance at 30 September 2025 was $148.8 million, an increase of $76.5 million versus the prior quarter. Cash increased
during the September 2025 quarter due to the injection of capital following the completion of the merger between Sayona and Piedmont,
which included $52 million of cash acquired from Piedmont (which is net of $8 million of merger transaction costs incurred by Piedmont)
and $69 million raised through the issuance of new shares.
| QUARTERLY ACTIVITIES REPORT • September 2025 | 10 |
The
NAL loss from operations of $2 million was lower than the prior quarter based on the increase in realised pricing and relatively consistent
unit operating costs, while NAL saw a net operating cash outflow of $12 million primarily due to a planned build of finished goods inventory.
Elevra
also paid $9 million in merger transaction costs and $13 million in capital expenditure in the September 2025 quarter, with the
capital expenditure related to upgrading the Tailings Storage Facility and various other NAL sustaining capital projects.
Figure
3: Net cash flows for September 2025 Quarter
Capital
Structure
At
30 September 2025, the Company has the following capital structure:
| · | 168,458,841
ordinary fully paid shares; |
| · | 2,723,613
unquoted options expiring on 31 December 2028; |
| · | 14,897
unquoted options (expiring various dates); |
| · | 1,771,386
unquoted performance rights (expiring various dates). |
Announcement
authorised for release by Mr Lucas Dow, Managing Director and CEO of Elevra Lithium Limited.
For
more information, please contact:
Andrew
Barber
Chief
Development and Investor Relations Officer
Email:
ir@elevra.com
Phone:
+61 7 3369 7058
| QUARTERLY ACTIVITIES REPORT • September 2025 | 11 |
Information
The
following information applies to this report:
| · | All
references to dollars and cents are Australian currency, unless otherwise stated. |
| · | Numbers
presented may not add up precisely to the totals provided due to rounding. |
The
following abbreviations may have been used throughout this report: cost, insurance and freight (CIF); dry metric tonne (dmt); earnings
before interest and tax (EBIT); earnings before interest, tax, depreciation and amortisation (EBITDA); free on board (FOB); life of mine
(LOM); lithium carbonate (Li2CO3); lithium hydroxide (LiOH); lithium oxide (Li2O); net present value
(NPV); run of mine (ROM); thousand tonnes (kt); tonnes (t); and wet metric tonne (wmt).
Forward-Looking
Statements
This
report may contain certain forward-looking statements. Such statements are only predictions, based on certain assumptions and involve
known and unknown risks, uncertainties and other factors, many of which are beyond Elevra Lithium Limited's control. Actual events or
results may differ materially from the events or results expected or implied in any forward-looking statement. The inclusion of such
statements should not be regarded as a representation, warranty or prediction with respect to the accuracy of the underlying assumptions
or that any forward-looking statements will be or are likely to be fulfilled.
Elevra
Lithium Limited undertakes no obligation to update any forward-looking statement or other statement to reflect events or circumstances
after the date of this report (subject to securities exchange disclosure requirements).
The
information in this report does not take into account the objectives, financial situation or particular needs of any person. Nothing
contained in this report constitutes investment, legal, tax or other advice.
The
Company confirms that it is not aware of any new information or data that materially affects the information included in the original
market announcement and all material assumptions and technical parameters continue to apply and have not materially changed. The Company
confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the
original market announcements.
| QUARTERLY ACTIVITIES REPORT • September 2025 | 12 |
About Elevra Lithium
Elevra
Lithium Limited (ASX: ELV; NASDAQ: ELVR; OTCQB: SYAXF) is North America's largest hard-rock lithium producer with a diversified portfolio
of high-quality assets across Québec Canada, the United States, Ghana and Western Australia.
Our
flagship operation, the North American Lithium (NAL) mine in Québec, Canada has successfully ramped up production of spodumene
concentrate, supported by ongoing operational enhancements to increase recovery rates, throughput, and mill utilisation. Following a
Mineral Resource upgrade, Elevra completed a Scoping Study for a brownfield expansion to increase NAL’s annual spodumene concentrate
production and reduce unit operating costs.
Complementing
NAL, the Moblan Lithium Project in northern Québec represents one of the largest undeveloped spodumene resources in North America,
with a Mineral Resource of 121 Mt @ 1.19% Li₂O. Development activities are progressing with feasibility studies targeting a large-scale,
long-life operation capable of supplying both domestic and international markets.
In
Western Australia, Elevra holds an extensive portfolio of lithium and gold tenements, where exploration programs are advancing to unlock
additional growth opportunities. Meanwhile, in the United States, our Carolina Lithium Project offers a strategic foothold in the downstream
lithium chemicals market and our project in Ghana provides a further option for future growth.
Looking
ahead, Elevra is focused on strategic downstream partnerships to enable further value-added lithium production, positioning the Company
to deliver a secure, sustainable supply of critical minerals to global customers. Together, these assets establish Elevra as a growth-focused
supplier supporting the global energy transition.
For
more information, please visit us at www.elevra.com
| QUARTERLY ACTIVITIES REPORT • September 2025 | 13 |
Appendix
| | |
Unit | |
Q1 FY25 | | |
Q2 FY25 | | |
Q3 FY25 | | |
Q4 FY25 | | |
Q1 FY26 | |
| Physicals9 | |
| |
| | | |
| | | |
| | | |
| | | |
| | |
| Ore mined | |
wmt | |
| 240,274 | | |
| 370,409 | | |
| 322,407 | | |
| 361,883 | | |
| 338,341 | |
| Ore crushed | |
wmt | |
| 361,859 | | |
| 342,752 | | |
| 292,962 | | |
| 379,353 | | |
| 349,698 | |
| Ore processed | |
dmt | |
| 358,535 | | |
| 342,855 | | |
| 287,782 | | |
| 357,290 | | |
| 341,780 | |
| Concentrate produced | |
dmt | |
| 52,141 | | |
| 50,922 | | |
| 43,261 | | |
| 58,533 | | |
| 52,003 | |
| Concentrate sold | |
dmt | |
| 48,992 | | |
| 66,035 | | |
| 27,030 | | |
| 66,980 | | |
| 25,975 | |
| | |
| |
| | | |
| | | |
| | | |
| | | |
| | |
| Unit Metrics | |
| |
| | | |
| | | |
| | | |
| | | |
| | |
| Average realised selling price (FOB)10 | |
A$/dmt | |
| 1,067 | | |
| 1,054 | | |
| 1,142 | | |
| 1,054 | | |
| 1,198 | |
| Average
realised selling price (FOB) 10 | |
US$/dmt | |
| 711 | | |
| 686 | | |
| 710 | | |
| 682 | | |
| 784 | |
| Unit
operating cost sold (FOB)11 | |
A$/dmt | |
| 1,335 | | |
| 1,280 | | |
| 1,374 | | |
| 1,232 | | |
| 1,250 | |
| Unit
operating cost sold (FOB)11 | |
US$/dmt | |
| 894 | | |
| 837 | | |
| 830 | | |
| 791 | | |
| 818 | |
| | |
| |
| | | |
| | | |
| | | |
| | | |
| | |
| Production Variables | |
| |
| | | |
| | | |
| | | |
| | | |
| | |
| Mill utilisation | |
% | |
| 91 | % | |
| 90 | % | |
| 80 | % | |
| 93 | % | |
| 87 | % |
| Recovery | |
% | |
| 67 | % | |
| 68 | % | |
| 69 | % | |
| 73 | % | |
| 69 | % |
| Concentrate grade produced | |
% | |
| 5.3 | % | |
| 5.3 | % | |
| 5.2 | % | |
| 5.2 | % | |
| 5.2 | % |
9 All figures are reported in 100% terms. Numbers presented
may not add up precisely to the totals provided due to rounding.
10 Average realised selling price is calculated on an accruals
basis and reported in $/dmt sold, FOB Port of Québec.
11 Unit operating cost sold is calculated on an accruals
basis and includes mining, processing, transport, port charges, site-based general and administration costs and cash based inventory
movements, and excludes depreciation and amortisation charges, freight and royalties. It is reported in $/dmt sold, FOB Port of Québec.
| QUARTERLY ACTIVITIES REPORT • September 2025 | 14 |
SIGNATURE
Pursuant
to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by
the undersigned, thereunto duly authorized.
| |
ELEVRA
LITHIUM LIMITED |
| |
|
|
| Date:
October 29, 2025 |
By: |
/s/
Dylan Roberts
Name: Dylan
Roberts |
| |
|
Title:
Company Secretary and General Counsel |
| QUARTERLY ACTIVITIES REPORT • September 2025 | 15 |