Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.

Form Type
6-K

Rhea-AI Filing Summary

Endeavour Silver Corp. reported Q3 2026 production of 2,096,545 ounces of silver and 10,126 ounces of gold. Silver-equivalent production was 3,611,034 ounces, 19% above Q3 2025. For the first nine months of 2026, silver production was 5,915,874 ounces and gold production was 32,340 ounces.

Terronera operations were suspended from August 12 to August 24, 2026, and its quarterly throughput was 165,171 tonnes, compared with 175,729 tonnes in Q2. Guanaceví’s mill was taken offline on September 21, 2026, for primary mill head and trunnion replacement; processing continued at lower throughput, with repairs expected to be completed in the first half of October. Kolpa throughput was 256,052 tonnes, compared with 233,408 tonnes in Q2, following the plant expansion commissioned at the end of Q1.

Following operational interruptions at Terronera and Guanaceví, Endeavour is recalculating full-year production and cost guidance and expects production to be at or slightly below the low end of its guided range. Updated guidance is due with Q3 results on November 9, 2026. Greg Blaylock will depart his role as Vice President, Operations.

0 points · 0 major

How this balance works

Rhea-AI gives every point it takes from this document a weight. Minor counts 1, Moderate 3 and Major 9, so one Major point outweighs several Minor ones. The bar adds up the weights on each side, and when neither side holds more than 65% of the total the balance reads Mixed.

It reads the document as published, with the same rules for every company, and it does not look at what the market expected or at how the stock traded, so a point can be objectively good on a day the stock falls.

Rhea-AI Sentiment measures something else, the tone of the wording.

0 major · 1 point

Hollow bars mark forward-looking points. How the balance works

Positive

  • None.

Negative

  • Moderate point. Forward-looking: it has not happened yet and may not happen.Full-year production is expected at or slightly below the low end of guidance; an update is due November 9, 2026.
Silver produced 2,096,545 ounces Three months ended September 30, 2026; 19% above Q3 2025
Gold produced 10,126 ounces Three months ended September 30, 2026; 39% above Q3 2025
Silver equivalent ounces produced 3,611,034 ounces Three months ended September 30, 2026; 19% above Q3 2025
Throughput 510,944 tonnes Three months ended September 30, 2026; 28% above Q3 2025
Silver produced 5,915,874 ounces Nine months ended September 30, 2026; 33% above the same period in 2025
Gold produced 32,340 ounces Nine months ended September 30, 2026; 38% above the same period in 2025
Silver equivalent ounces produced 10,390,771 ounces Nine months ended September 30, 2026; 40% above the same period in 2025
silver equivalent technical
"silver equivalent production of 3.6 million oz"
A "silver equivalent" converts the value or quantity of other metals (like gold, lead, or zinc) into the amount of silver they’re worth using current price ratios, so a mixed-metal output can be reported as a single silver total. For investors this makes it easy to compare and sum the value of different metals — like turning various fruits into the same currency of apples — helping assess production, revenue potential, and project scale without juggling multiple metal prices.
throughput technical
"Consolidated throughput and grades were consistent with throughput and grades in Q2 2026"
Throughput is the amount of stuff, like products or data, that a system can handle or move through in a certain period of time. For example, a factory’s throughput is how many items it produces each hour, and it matters because higher throughput usually means things are running efficiently and meeting demand quickly.
metal recoveries technical
"Metal recoveries have further improved through continued process refinement"
sill development technical
"Sill development commenced in the high-grade zones of Terronera"
commercial production technical
"Terronera, which achieved commercial production on October 1, 2025"
Commercial production is the full-scale manufacturing and release of a product for sale to customers after development and any required approvals. It matters to investors because it signals a shift from testing and one-off batches to steady revenue, larger costs for facilities and supplies, and risks around meeting demand and quality standards — like turning a home-cooked recipe into a restaurant menu that must be produced consistently and profitably.

FAQ

AI-generated questions and answers. How Rhea-AI works. Not financial advice.

How much silver and gold did EXK produce in Q3 2026?

EXK produced 2,096,545 ounces of silver and 10,126 ounces of gold in Q3 2026. Silver-equivalent production was 3,611,034 ounces.

What is EXK’s full-year production outlook?

EXK expects full-year production to be at or slightly below the low end of its guided range and is recalculating production and cost guidance. Updated guidance is due with the Q3 earnings release on November 9, 2026.

Why was Terronera throughput lower in Q3 2026?

Terronera operations were suspended from August 12 to August 24, 2026, during a blockade. Quarterly throughput was 165,171 tonnes, compared with 175,729 tonnes in Q2 2026.

When will EXK report Q3 2026 financial results and hold its conference call?

EXK plans to release Q3 2026 financial results after market close on November 9, 2026. Management’s conference call is scheduled for November 10, 2026, at 9:00 a.m. Pacific Time and 11:00 a.m. Eastern Standard Time.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google
Learn about SEC filing dates
 

UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

Form 6-K

REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16 UNDER THE SECURITIES EXCHANGE ACT OF 1934

For the month of October 2026

Commission File Number: 001-33153

Endeavour Silver Corp.
(Translation of registrant's name into English)

#1130-609 Granville Street
Vancouver, British Columbia, Canada V7Y 1G5

(Address of principal executive office)

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.
Form 20-F [   ]      Form 40-F [ X ]

 

 


SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

      Endeavour Silver Corp.    
  (Registrant)
   
  
Date: October 8, 2026     /s/ DAN DICKSON    
  Dan Dickson
  CEO
  


EXHIBIT INDEX

 

Exhibit Number Description
  
99.1 Press Release dated October 8, 2026

EXHIBIT 99.1

Endeavour Silver Produces 2,096,545 Oz Silver and 10,126 Oz Gold, for a total of 3.6 Million Silver Equivalent Oz in Q3 2026

VANCOUVER, British Columbia, Oct. 08, 2026 (GLOBE NEWSWIRE) -- Endeavour Silver Corp. (“Endeavour” or the “Company”) (NYSE: EXK; TSX: EDR) reports third quarter 2026 production of 2,096,545 silver ounces (“oz”), 10,126 gold oz, and in combination with base metals, a silver equivalent(1) production of 3.6 million oz. Year-to-date production was 5,915,874 silver oz and 32,340 gold oz for a total silver equivalent(1) production of 10.4 million oz. All dollar amounts are in US dollars ($).

“Despite temporary operational disruptions, we are encouraged by our underlying metrics in the third quarter, with the Terronera plant reaching optimal processing performance and the Kolpa expansion exceeding expectations.” commented Dan Dickson, Chief Executive Officer. “This performance reflects the focus and resilience of our teams, who responded effectively to temporary operational disruptions while maintaining a strong commitment to safe production. With these challenges successfully managed and with our operations continuing to advance, we are well positioned to build on this progress and carry positive momentum into the fourth quarter.”

Q3 2026 Production Overview

  • Consistent Throughput: Consolidated throughput and grades were consistent with throughput and grades in Q2 2026. Metal recoveries have further improved through continued process refinement, resulting in consolidated production in line with plan and silver equivalent(1) production of 3.6 million oz, compared to 3.4 million produced in Q2 2026.
  • Kolpa Further Increases Throughput: Throughput increased in Q3 2026 to 256,052 tonnes, compared to 233,408 tonnes in Q2 2026, reflecting the continued benefits of the plant expansion commissioned at the end of Q1 2026.
  • Blockade and Suspension of Operations at Terronera Mine: Operations at the Terronera mine were suspended from August 12 to August 24, 2026, resulting in a slightly lower Q3 throughput of 165,171 tonnes compared to 175,729 tonnes in Q2 2026. During the quarter, metal recoveries improved with optimization and refinement within the plant. Sill development commenced in the high-grade zones of Terronera.
  • Guanaceví Temporary Reduction of Capacity: The mill was taken offline on September 21 to replace the primary mill head and trunnion, with repairs expected to be completed in the first half of October. During this period, processing has continued at a lower throughput. This resulted in lower than planned throughput for the quarter of 89,722 tonnes. Ore grades improved compared to the prior quarter; however, higher prices enable mining in lower grade areas, extending mine life.
  • Metal Sales and Inventories: Total sales of 1,900,368 silver oz and 9,499 gold oz during the third quarter. A total of 363,854 silver oz and 1,346 gold oz of bullion inventory and 59,547 silver oz and 306 gold oz in concentrate inventory were held as at September 30, 2026.

Q3 2026 Operations

Consolidated silver production was 2,096,545 oz in Q3 2026, slightly below plan, and 19% higher than 1,766,926 oz produced in Q3 2025. Higher production is attributed to the higher silver production from Kolpa and the additional 710,670 oz of silver contributed by Terronera, which achieved commercial production on October 1, 2025. These higher contributions were partially offset by the sale of Bolañitos which was finalized on January 15, 2026. Silver production at Guanaceví was 31% lower in Q3 2026 compared to Q3 2025, predominantly due to 24% lower silver grades and 10% lower throughput.

Consolidated gold production was 10,126 oz in Q3 2026, 39% higher than 7,285 oz produced in Q3 2025. Higher production is primarily attributable to the addition of 7,157 oz from Terronera, partially offset by the sale of Bolañitos. Gold production at Guanacevi was 7% lower than Q3 2025, predominantly due to the 10% lower throughput and 1% lower gold grade. 

Terronera’s Q3 2026 production was slightly below plan, reflecting lower throughput during the blockade in August. In September 2026, following the resolution of the blockade, Terronera processed 60,313 tonnes and produced 299,398 oz of silver and 2,472 oz of gold during the month.

During Q3 2026, Terronera recoveries averaged 88.0% for silver and 75.0% for gold, slightly above Q1 and Q2 2026 and in line with plan. Recoveries improved during the quarter, as shown in the monthly production results table below, trending from 85.6% in July and 86.2% in August achieving a recovery of 91.1% in September reflecting the success of optimization work undertaken during the period. Ore grades of 152 grams per tonne (gpt) compared to 126 in Q2 2026 for silver and 1.80 gpt of gold compared to 1.87 in Q2 2026 for gold were in line with plan for the quarter. Grades improved as planned with sill development in higher grade zones commencing during the quarter.

Guanaceví’s throughput was 10% lower than Q3 2025 due to the reduction in capacity in September. Grades were higher than in the preceding quarters but lower than Q3 2025 due to the planned mining sequence through lower-grade areas of the deposit and higher than planned dilution. Supplies of local third-party mill feed continued to supplement Guanaceví production, amounting to 33% of quarterly throughput.

Kolpa's throughput in Q3 2026 was 256,052 tonnes producing 682,903 oz of silver, compared to 233,408 tonnes producing 633,288 oz of silver in Q2 2026, following the plant ramp-up to 2,500 tonnes per day at the end of Q1 2026. The processed material in Q3 2026 averaged grades of 92 g/t silver, 2.67% lead, 2.08% zinc and 0.25% copper. Despite the slightly lower grades, due to the significant increase in throughput, production of silver exceeded plan while production of base metals remained in line with plan.

Updated Guidance

With operational interruptions at Terronera and Guanaceví during the quarter, the Company will be performing recalculations of full year production and cost guidance. Production for the full year is expected to be at or slightly below the low end of the guided range. A guidance update will be provided with the third quarter earnings release on November 9, 2026.

Consolidated Production Highlights for the Three and Nine Months Ended September 30, 2026

Three Months Ended September 30 Nine Months Ended September 30
20262025% Change 20262025% Change
510,944400,24528%Throughput (tonnes)1,477,177913,58062%
2,096,5451,766,92619%Silver ounces produced5,915,8744,456,45533%
10,1267,28539%Gold ounces produced32,34023,37938%
6,5045,66415%Lead tonnes produced17,6509,16793%
4,5583,66624%Zinc tonnes produced11,3895,98290%
14312020%Copper tonnes produced33617889%
2,031,4251,725,31718%Payable silver ounces produced5,719,3344,373,08731%
9,8527,15138%Payable gold ounces produced31,37022,97837%
3,611,0343,037,15619%Silver equivalent ounces produced110,390,7717,438,64540%
1,900,3681,762,4848%Silver ounces sold5,596,6964,441,84826%
9,4997,47827%Gold ounces sold31,26523,72232%

1 Silver equivalent for 2026 is calculated using 90 silver oz to 1 gold oz; 45 silver oz to 1 lead tonne; 61 silver oz to 1 zinc tonne; 238 silver oz to 1 copper tonne. Silver equivalent for 2025 is calculated using 80 silver oz to 1 gold oz; 60 silver oz to 1 lead tonne; 85 silver oz to 1 zinc tonne; 300 silver oz to 1 copper tonne ratios.
Bolañitos mine was sold January 15, 2026, and is included in the consolidated results above.

Production Tables for the Three Months Ended September 30, 2026, by mine

Three Months Ended September 30, 2026TerroneraGuanacevíKolpa
Tonnes processed165,17189,722256,052
Tonnes per day1,7959752,783
Silver ounces produced710,670702,972682,903
Silver grade gpt15225792
Silver recovery88.0%94.9%90.3%
Gold ounces produced7,1572,969-
Gold grade gpt1.801.06-
Gold recovery75.0%96.8%-
Lead tonnes produced--6,504
Lead grade %--2.67%
Lead recovery %--95.2%
Zinc tonnes produced--4,558
Zinc grade %--2.08%
Zinc recovery %--85.7%
Copper tonnes produced--143
Copper grade %--0.25%
Copper recovery %--22.7%
Silver equivalent ounces produced11,354,759970,2051,286,070

Totals may not add up due to rounding.
1 Silver equivalent for 2026 is calculated using 90 silver oz to 1 gold oz; 45 silver oz to 1 lead tonne; 61 silver oz to 1 zinc tonne; 238 silver oz to 1 copper tonne.

Terronera Production by Month for the Three Months Ended September 30, 2026

The table below presents monthly production at Terronera during the third quarter. Metal recoveries improved throughout the quarter as processing activities were refined and optimized. Metal grades also strengthened as sill development commenced in higher-grade zones during the third quarter.

Three Months Ended September 30, 2026JulyAugustSeptemberTotal
Tonnes processed65,30739,55160,313165,171
Tonnes per day2,1071,2762,0101,795
Silver ounces produced230,405180,868299,398710,670
Silver grade gpt128165169152
Silver recovery85.6%86.2%91.1%88.0%
Gold ounces produced3,0491,6352,4727,157
Gold grade gpt1.951.731.671.80
Gold recovery74.3%74.5%76.3%75.0%
Silver equivalent ounces produced1504,836328,042521,8811,354,759

1 Silver equivalent for 2026 is calculated using 90 silver oz to 1 gold oz; 45 silver oz to 1 lead tonne; 61 silver oz to 1 zinc tonne; 238 silver oz to 1 copper tonne.

Production Tables for the Nine Months Ended September 30, 2026, by mine

Nine Months Ended September 30, 2026TerroneraGuanacevíKolpa
Tonnes processed516,318285,684661,187
Tonnes per day1,8911,0462,422
Silver ounces produced1,852,3182,198,8511,846,309
Silver grade gpt13025996
Silver recovery86.0%92.6%90.5%
Gold ounces produced23,3018,547-
Gold grade gpt1.911.00-
Gold recovery73.4%92.7%-
Lead tonnes produced--17,650
Lead grade %--2.81%
Lead recovery %--94.9%
Zinc tonnes produced--11,389
Zinc grade %--2.03%
Zinc recovery %--84.7%
Copper tonnes produced--336
Copper grade %--0.23%
Copper recovery %--22.1%
Silver equivalent ounces produced13,949,3752,968,0543,410,577

1 Silver equivalent for 2026 is calculated using 90 silver oz to 1 gold oz; 45 silver oz to 1 lead tonne; 61 silver oz to 1 zinc tonne; 238 silver oz to 1 copper tonne.
Bolañitos mine was sold January 15, 2026, and is not included in the breakdown above.
Totals may not add up due to rounding.

Management Change

The Company also announces that Greg Blaylock will be departing from his role as Vice President, Operations. The Company thanks Mr. Blaylock for his dedicated service and wishes him every success in the future.

About Endeavour Silver

Endeavour is a mid-tier silver producer with three operating mines in Mexico and Peru and a robust pipeline of exploration projects across Mexico, Chile, and the United States. With a proven track record of discovery, development, and responsible mining, Endeavour is driving organic growth and creating lasting value on its path to becoming a leading senior silver producer.

Qualified Person

Dale Mah, P.Geo., Vice President Corporate Development, a qualified person under NI 43-101, has approved the scientific and technical information related to operations matters in this news release.

Q3 2026 Financial Results and Conference Call

Q3 2026 financial results will be released after market close on Monday, November 9, 2026, and Management will host a conference call the next day, Tuesday, November 10, 2026, at 9:00 a.m. Pacific Time / 11:00 a.m. Eastern Standard Time to discuss the results.

Date: Tuesday, November 10, 2026
  
Time:9:00am Pacific Time / 11:00am Eastern Standard Time
  
Telephone:Canada & US + 1-833-752-3348
International + 1-647-846-2804
  
Replay:Canada & US +1- 855-669-9658
International +1-412-317-0088 
Access code is 5403106; audio replay will be available on the Company’s website
  

Contact Information

Allison Pettit
Vice President, Investor Relations
Email: apettit@edrsilver.com
Website: www.edrsilver.com

Cautionary Note Regarding Forward-Looking Statements

This news release contains “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation. Such forward-looking statements and information herein include, but are not limited to, statements regarding the timing for completion of repairs at the Guanaceví mill; the Company’s positioning; updates to guidance and the timing thereof; expected production; the Company’s plans to drive organic growth, create lasting value and become a leading senior silver producer; and the timing and results of various activities. The Company does not intend to and does not assume any obligation to update such forward-looking statements or information, other than as required by applicable law.

Forward-looking statements or information involve known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, production levels, performance or achievements of Endeavour and its operations to be materially different from those expressed or implied by such statements. Such factors include but are not limited to disruptions and delays due to blockades, protests, demonstrations and similar actions; unexpected changes in production and cost guidance; the ongoing effects of inflation and supply chain issues on mine economics; the failure to complete repairs at the Guanaceví mill in a timely manner or at the expected cost; the effectiveness of alternative processing methods; a greater-than-anticipated adverse impact on production levels and costs; changes in national and local governments’ legislation, taxation, controls, regulations and political or economic developments in Canada, Chile, the USA, Mexico and Peru; financial risks due to precious metals prices; operating or technical difficulties in mineral exploration, development and mining activities; risks and hazards of mineral exploration, development and mining (including, but not limited to environmental hazards, industrial accidents, unusual or unexpected geological conditions, pressures, cave-ins and flooding); inadequate insurance, or inability to obtain insurance; availability of and costs associated with mining inputs and labour; the speculative nature of mineral exploration and development; diminishing quantities or grades of mineral reserves as properties are mined; risks in obtaining necessary licenses and permits; fluctuations in the prices of silver and gold; fluctuations in currency markets (particularly the Mexican peso, Peruvian sol, Chilean peso, Canadian dollar and U.S. dollar); and challenges to the Company’s title to properties; as well as those factors described in the section “Risk Factors” contained in the Company’s most recent form 40F/Annual Information Form filed with the S.E.C. and Canadian securities regulatory authorities.

Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to: the continued operation of the Company’s mining operations, no material adverse change in the market price of commodities, forecasted mine economics, mining operations will operate and the mining projects will be completed in accordance with management’s expectations and achieve their stated production outcomes, and such other assumptions and factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or information, there may be other factors that cause results to be materially different from those anticipated, described, estimated, assessed or intended. There can be no assurance that any forward-looking statements or information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.

Filing Exhibits & Attachments

1 document

Keep reading