Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.

Form Type
6-K

Rhea-AI Filing Summary

Fury Gold Mines Limited (FURY) reported a net loss of C$7.799 million for the three months ended September 30, 2026, compared with C$4.699 million a year earlier. For the first nine months, net loss was C$7.607 million, versus C$9.687 million in 2025. Nine-month exploration and evaluation costs were C$22.2 million, compared with C$9.489 million.

At September 30, 2026, Fury had C$5.784 million in cash, C$43.662 million in marketable securities and C$48.611 million in working capital surplus. Management said working capital was sufficient to meet obligations and fund exploration for at least the next 12 months. Fury completed a 4,219-metre Committee Bay program involving 11 holes, including one abandoned hole. The Phase 2 Eau Claire program is aimed at converting inferred portions of the resource to indicated, with approximately 25,000 metres of drilling anticipated.

1 point · 0 major

How this balance works

Rhea-AI gives every point it takes from this document a weight. Minor counts 1, Moderate 3 and Major 9, so one Major point outweighs several Minor ones. The bar adds up the weights on each side, and when neither side holds more than 65% of the total the balance reads Mixed.

It reads the document as published, with the same rules for every company, and it does not look at what the market expected or at how the stock traded, so a point can be objectively good on a day the stock falls.

Rhea-AI Sentiment measures something else, the tone of the wording.

0 major · 2 points

How the balance works

Positive

  • Moderate pointNine-month net loss fell to C$7.607 million from C$9.687 million.

Negative

  • Moderate pointQ3 net loss rose to C$7.799 million from C$4.699 million.
  • Moderate pointNine-month operating cash use rose to C$23.139 million from C$12.567 million.

Filing Explained

By November 13, 2026, Fury estimated working capital had fallen about C$3,000 thousand since September 30.

The marketable securities include Contango shares received in the March merger with Dolly Varden; Fury says it lost significant influence after the exchange and reclassified the holding as a financial asset.

Fury describes the securities as free-trading and available to fund operations for at least the next 12 months, and says a 10% change in their prices would materially affect net loss.

By November 13, 2026, the company estimated working capital had declined about C$3,000 thousand since September 30 due to general corporate and exploration costs.

Net loss, three months C$7.799 million Three months ended September 30, 2026; C$4.699 million for the corresponding 2025 period.
Net loss, nine months C$7.607 million Nine months ended September 30, 2026; C$9.687 million for the corresponding 2025 period.
Cash used in operating activities C$23.139 million Nine months ended September 30, 2026; C$12.567 million in 2025.
Working capital surplus C$48.611 million At September 30, 2026.
Cash C$5.784 million At September 30, 2026.
Marketable securities C$43.662 million At September 30, 2026.
Committee Bay drill intercept 0.77 g/t gold over 98.60 m Hole 26TB161; including 65.60 g/t gold over 0.56 m.
Ninaaskumuwin lithium concentrate 6.02% Li₂O Potential direct shipping ore concentrate; 76.7% lithium recovery in 23.0% of feed mass.
inferred mineral resource technical
"initial inferred mineral resource comprised 23.9 million tonnes"
An inferred mineral resource is an early-stage estimate of the amount and grade of minerals in the ground based on limited sampling and geological evidence; think of it as a rough sketch of where valuable material might be, rather than a detailed blueprint. It matters to investors because it signals potential upside but carries high uncertainty—further drilling and study are needed before it can support mine planning or reliable economic forecasts.
dense media separation (DMS) technical
"A single dense media separation (DMS) step"
direct shipping ore concentrate technical
"potential direct shipping ore concentrate grading 6.02% Li₂O"
Three Bluffs shear zone technical
"All five holes intersected the Three Bluffs shear zone"
flow-through shares financial
"Flow-through shares are issued at a premium"
Flow-through shares are a special class of stock that lets a company pass eligible tax deductions for activities like resource exploration or development directly to the investor who buys the shares. For investors this can lower taxable income and reduce tax bills, making the investment more tax-efficient and partially offsetting higher risk—think of it as getting a tax rebate that helps pay for a riskier bet on future resource discoveries.
Net Smelter Return financial
"subject to a 1% Net Smelter Return"
Net smelter return is the percentage of revenue from selling a mineral or metal that a mining company or project owner receives after deducting costs like refining and transportation. It functions like a share of the profits from the mineral's sale, giving investors an idea of how much money the project generates. This measure helps investors assess the potential profitability of a mining asset.

FAQ

AI-generated questions and answers. How Rhea-AI works. Not financial advice.

What was FURY’s net loss in Q3 and the first nine months of 2026?

Fury Gold Mines Limited reported a net loss of C$7.799 million for the three months ended September 30, 2026, compared with C$4.699 million in 2025; its nine-month net loss was C$7.607 million, versus C$9.687 million a year earlier.

What drilling results did FURY report at Committee Bay?

Hole 26TB161 intersected 0.77 g/t gold over 98.60 m, including 65.60 g/t over 0.56 m. Hole 26TB158 intersected 3.88 g/t gold over 17.82 m, including 18.78 g/t over 3.30 m.

What did FURY’s Ninaaskumuwin lithium test work produce?

A single dense media separation step on the coarsest crushed feed produced a potential direct shipping ore concentrate grading 6.02% Li₂O, with 76.7% lithium recovery in 23.0% of the feed mass.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google


UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

 

FORM 6-K

 

REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934

 

For the month of November 2026

 

Commission File No. 001-38145

 

Fury Gold Mines Limited
(Translation of registrant's name into English)

 

401 Bay Street, 16th Floor, Toronto, Ontario, Canada, M5H 2Y4
(Address of principal executive office)

 

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F

 

Form 20-F ☐  Form 40-F ☒

 

 

 

 

 

SUBMITTED HEREWITH

 

Exhibits  
99.1 Condensed Interim Consolidated Financial Statements
99.2 Management’s Discussion And Analysis
99.3 CEO certification of interim filings
99.4 CFO certification of interim filings

 

 

 

 

 

 

 

 

SIGNATURE

 

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

Dated: November 13, 2026

 

Fury Gold Mines Limited



/s/ Phil van Staden  

Phil van Staden

Chief Financial Officer

 

 

 

 

 

 

 

 

Exhibit 99.1

 

 

 

 

 

 

 

 

 

 

(An exploration company)

 

 

 

 

 

CONDENSED INTERIM

 

CONSOLIDATED FINANCIAL STATEMENTS

 

(Unaudited)

 

 

 

FOR THE THREE AND NINE MONTHS ENDED SEPTEMBER 30, 2026

 

 

 

 

 

 

 

 

Fury Gold Mines Limited

Condensed Interim Consolidated Statements of Financial Position

(Expressed in thousands of Canadian dollars - Unaudited)

      At September 30   At December 31 
   Note  2026   2025 
Assets             
Current assets:             
Cash     $5,784   $21,197 
Marketable securities  3   43,662    7,783 
Other investment  11   2,128    2,031 
Amounts receivable      709    395 
Prepaid expenses and deposits      1,253    591 
       53,536    31,997 
Non-current assets:             
Restricted cash      173    144 
Property and equipment      338    297 
Mineral property interests  4   49,603    49,918 
Investments in associates      95    25,963 
       50,209    76,322 
Total assets     $103,745   $108,319 
              
Liabilities and Equity             
Current liabilities:             
Accounts payable and accrued liabilities     $4,891   $2,023 
Deferred government grant      -    22 
Flow-through share premium liability  5   34    790 
       4,925    2,835 
Non-current liabilities:             
Provision for site reclamation and closure      4,265    4,473 
Total liabilities     $9,190   $7,308 
              
Equity:             
Share capital     $340,411   $339,782 
Share option and warrant reserve  8   25,430    24,911 
Accumulated other comprehensive loss      (28)   (31)
Deficit      (271,258)   (263,651)
Total equity     $94,555   $101,011 
Total liabilities and equity     $103,745   $108,319 

Commitments (notes 8, 11)

 

Approved on behalf of the Board of Directors:

“Forrester A. Clark”   “Steve Cook”  
Chief Executive Officer   Director  

 

 

The accompanying notes form an integral part of these condensed interim consolidated financial statements.

 

Fury Gold Mines Limited1

 

 

Fury Gold Mines Limited

Condensed Interim Consolidated Statements of Loss and Comprehensive Loss

(Expressed in thousands of Canadian dollars, except per share amounts - Unaudited)  

      Three months ended
September 30
   Nine months ended
September 30
 
   Note  2026   2025   2026   2025 
Operating expenses:                       
Exploration and evaluation  6  $10,308   $4,295   $22,200   $9,489 
Fees, salaries and other employee benefits      641    485    2,195    1,547 
Insurance      108    114    321    372 
Legal and professional      150    310    555    896 
Marketing and investor relations      177    198    610    615 
Office and administration      125    51    321    219 
Regulatory and compliance      43    71    308    262 
       11,552    5,524    26,510    13,400 
                        
Other (income) expenses, net:                       
Accretion on provision for site reclamation and closure      36    36    107    111 
Amortization of flow-through share premium  5   (349)   (194)   (756)   (1,142)
Foreign exchange loss (gain)      4    3    (91)   4 
Interest expense      -    -    -    2 
Interest income      (37)   (53)   (239)   (132)
Net loss from associates      4    1,847    935    3,634 
Net gain on investments in associates  3   -    (1,854)   (19,241)   (5,232)
Net loss (gain) on marketable securities  3   (3,367)   (320)   650    (668)
Net loss on disposal of equipment      -    -    20    - 
Other (income) expense      61    (126)   (190)   (144)
       (3,648)   (661)   (18,805)   (3,567)
Loss before taxes      7,904    4,863    7,705    9,833 
Tax recovery      (105)   (164)   (98)   (146)
Net loss for the period      7,799    4,699    7,607    9,687 
                        
Other comprehensive loss (income), net of tax                       
Unrealized currency loss (income) on translation of
foreign operations
      (2)   2    (3)   6 
Total comprehensive loss for the period     $7,797   $4,701   $7,604   $9,693 
                        
Loss per share:                       
Basic loss per share  10  $0.04   $0.03   $0.04   $0.06 
Diluted loss per share  10  $0.04   $0.03   $0.04   $0.06 
                        

 

 

The accompanying notes form an integral part of these condensed interim consolidated financial statements.

 

Fury Gold Mines Limited2

 

 

Fury Gold Mines Limited

Condensed Interim Consolidated Statements of Equity

(Expressed in thousands of Canadian dollars, except share amounts - Unaudited)

   Number of
common
shares
   Share
capital
   Share
option and
warrant
reserve
   Accumulated
other
comprehensive
loss
   Deficit   Total 
Balance at December 31, 2024   151,556,273   $312,723   $22,684   $(12)  $(257,192)  $78,203 
Total comprehensive loss   -    -    -    (6)   (9,687)   (9,693)
Shares and warrants exchanged in QPM Acquisition (note 7)   8,394,045    4,503    30    -    -    4,533 
Shares and warrants issued pursuant to private placement, net of share issue costs (note 7)   7,168,000    3,571    906    -    -    4,477 
Shares issued pursuant to offering, net of share issue costs and flow-through premium liability (note 5)   3,999,701    2,457    -    -    -    2,457 
Share options exercised (note 7)   231,000    190    (64)   -    -    126 
Share-based compensation (note 7)   382,027    779    (244)   -    -    535 
Balance at September 30, 2025   171,731,046   $324,223   $23,312   $(18)  $(266,879)  $80,638 
                               
Balance at December 31, 2025   189,143,299   $339,782   $24,911   $(31)  $(263,651)  $101,011 
Total comprehensive income   -    -    -    3    (7,607)   (7,604)
Restricted share units settled (note 7)   988,896    629    (629)   -    -    - 
Share-based compensation (note 7)   -    -    1,148    -    -    1,148 
Balance at September 30, 2026   190,132,195   $340,411   $25,430   $(28)  $(271,258)  $94,555 

 

 

The accompanying notes form an integral part of these condensed interim consolidated financial statements.

 

Fury Gold Mines Limited3

 

Fury Gold Mines Limited

Condensed Interim Consolidated Statements of Cash Flows

(Expressed in thousands of Canadian dollars - Unaudited)

      Nine months ended September 30 
      2026   2025 
Operating activities:             
Income (loss) for the period     $(7,607)  $(9,687)
Adjusted for:             
Interest income      (239)   (132)
Net loss on disposal of equipment      20    - 
Government grant received      -    83 
Items not involving cash:             
Accretion of provision for site reclamation and closure      107    111 
Amortization of flow-through share premium  5   (756)   (1,142)
Depreciation      64    151 
Interest expense      -    2 
Net loss from associates      935    3,634 
Net gain on investments in associates      (19,241)   (5,232)
Net loss (gain) on marketable securities  3   650    (668)
Share-based compensation  7   1,148    535 
Unrealized FX      (91)   - 
Changes in non-cash working capital  9   1,871    (222)
Cash used in operating activities      (23,139)   (12,567)
Investing activities:             
Acquisition of mineral interests, inclusive of transaction fees      -    (904)
Interest income      239    132 
Proceeds from disposition of investment in associate, net of transaction costs  3   -    6,539 
Proceeds from disposition of marketable securities, net of transaction costs  3   7,645    670 
Proceeds from disposition of equipment      33    - 
Property and equipment additions      (158)   (47)
Cash provided by investing activities      7,759    6,390 
Financing activities:             
Change in restricted cash      (29)   - 
Lease payments      -    (62)
Proceeds from financing, net of share issue costs      -    4,477 
Proceeds from issuance of flow-through shares, net of issuance costs      -    2,857 
Proceeds from exercise of options  7   -    126 
Cash (used in) provided by financing activities      (29)   7,398 
Effect of foreign exchange on cash      (4)   (6)
Decrease in cash      (15,413)   1,215 
Cash, beginning of period      21,197    4,912 
Cash, end of period     $5,784   $6,127 

Supplemental cash flow information (note 9)

 

The accompanying notes form an integral part of these condensed interim consolidated financial statements.

 

Fury Gold Mines Limited4

 

Note 1: Nature of operations

 

Fury Gold Mines Limited (the “Company” or “Fury Gold”) was incorporated on June 9, 2008, under the Business Corporations Act (British Columbia) and is listed on the Toronto Stock Exchange and the NYSE-American, with its common shares trading under the symbol FURY. The Company’s registered and records office is at 1500-1055 West Georgia Street Vancouver, BC, V6E 4N7 and the mailing address is 401 Bay Street, 16th Floor, Toronto, Ontario, M5H 2Y4.

 

The Company’s principal business activity is the acquisition and exploration of resource projects in Canada. At September 30, 2026, the Company had four principal projects: Committee Bay in Nunavut, Eau Claire, Sakami, and Éléonore South in Quebec. Additionally, the Company held a 25% interest in Universal Mineral Services Limited (“UMS”), a private shared-services provider.

 

These consolidated financial statements have been prepared on a going concern basis, which assumes that the Company will be able to meet its obligations and continue in operation for at least the next twelve months.

 

The Company is an exploration and evaluation company that currently does not generate operational revenue from its assets. As at September 30, 2026, the Company has working capital of $48,611 (December 31, 2025 – $29,162), which management believes is sufficient to meet its obligations and to continue to fund exploration expenses for at least the next twelve months. Beyond the next 12 months, the Company’s ability to continue as a going concern and to advance its projects might be dependent upon its ability to obtain the necessary financing. Although the Company has been successful in the past in obtaining financing, there is no assurance that it will be able to obtain adequate financing in the future or that such financing will be on terms advantageous to the Company.

 

Note 2: Basis of presentation

 

Statement of compliance

 

These unaudited condensed interim consolidated financial statements have been prepared in accordance with IFRS Accounting Standards as issued by the International Accounting Standards Board, applicable to the preparation of interim financial statements under International Accounting Standard 34, Interim Financial Reporting. Accordingly, these unaudited interim financial statements should be read in conjunction with the Company’s audited consolidated financial statements for the year ended December 31, 2025. These interim financial statements were approved and authorized for issuance by the Board of Directors of the Company on November 13, 2026.

 

Basis of preparation

 

These condensed interim financial statements include the accounts of the Company and its subsidiaries. Subsidiaries are entities controlled by the Company. Control exists when the Company has power over an investee, when the Company is exposed, or has rights, to variable returns from the investee, and when the Company has the ability to affect those returns through its power over the investee. Subsidiaries are included in the consolidated financial results of the Company from the effective date of acquisition up to the effective date of disposition or loss of control. The Company’s interim results are not necessarily indicative of its results for a full year.

 

The subsidiaries (with a beneficial interest of 100%) of the Company as at September 30, 2026, were as follows:

 

Subsidiary Place of
incorporation
Functional
currency
Eastmain Mines Inc. (“Eastmain Mines”) (a)  Canada CAD
Eastmain Resources Inc. (“Eastmain”) ON, Canada CAD
Fury Gold USA Limited (“Fury Gold USA”) (b)  Delaware, U.S.A. USD
North Country Gold Corp. (“North Country”) BC, Canada CAD
Quebec Precious Metals Corporation (“QPM”) (a) Canada CAD

 

 (a)The entity is incorporated federally in Canada.
 (b)Fury Gold USA provided certain administrative services with respect to employee benefits for US resident personnel.

 

Fury Gold Mines Limited

Notes to the Q3 2026 Condensed Interim Consolidated Financial Statements

(Expressed in thousands of Canadian dollars, except where noted - Unaudited) 

5

 

 

All amounts are expressed in thousands of Canadian dollars unless otherwise noted. Reference to US$ are to United States dollars. All intercompany balances and transactions have been eliminated

 

Segmented information

 

The Company’s operating segments are reviewed by the CEO, who is the chief operating decision maker (“CODM”) to make decisions about resources to be allocated to the segments and to assess their performance. The Company operates two reportable segments based on geographic location: Quebec and Nunavut, each focused on the acquisition, exploration, and development of mineral resource properties within Quebec and Nunavut. The information contained in note 6 is the information used by the CODM to assess where to deploy resources and capital.

 

Critical accounting estimates, judgments, and policies

 

The preparation of financial statements in accordance with IFRS Accounting Standards as issued by the IASB requires management to select accounting policies and make estimates and judgments that may have a significant impact on consolidated financial statements. Estimates are continuously evaluated and are based on management’s experience and expectations of future events that are believed to be reasonable under the circumstances. Actual outcomes may differ from these estimates.

 

In preparing the Company’s condensed interim financial statements for the three and nine months ended September 30, 2026, the Company applied the material accounting policy information and critical accounting estimates and judgments disclosed in notes 3 and 5, respectively, of its consolidated financial statements for the year ended December 31, 2025, except as explained below.

 

Adoption of new and revised accounting standards

 

Effective January 1, 2026, the Company adopted amendments to IFRS 9, Financial Instruments, and IFRS 7, Financial Instruments: Disclosures, providing clarifications for, among other things, the date of recognition and derecognition of financial assets and liabilities, and updating the disclosures for equity instruments designated at fair value through other comprehensive income. These amendments did not have a material impact on the Company's condensed interim consolidated financial statements.

 

We have applied the exception to the requirement to derecognize a financial liability on the settlement date. This exception permits the Company to deem a financial liability (or a part of a financial liability), that will be settled with cash using an electronic payment system, to be discharged before the settlement date if, and only if, we have initiated the payment instruction and:

 

§We have no practical ability to withdraw, stop or cancel the payment instruction;
§We have no practical ability to access the cash to be used for settlement as a result of the payment instruction; and
§The settlement risk associated with the electronic payment system is insignificant.

 

New and amended standards not yet effective

 

On April 9, 2024, the IASB issued a new standard, called IFRS 18 Presentation and Disclosure in Financial Statements, which applies to an annual reporting period beginning on or after January 1, 2027, with earlier application permitted. IFRS 18 includes requirements for all entities applying IFRS Accounting Standards as issued by the IASB for the presentation and disclosure of information in financial statements. The Company is currently evaluating the impact of the new standard on its financial statements.

 

Fury Gold Mines Limited

Notes to the Q3 2026 Condensed Interim Consolidated Financial Statements

(Expressed in thousands of Canadian dollars, except where noted - Unaudited) 

6

 

Note 3: Marketable securities

 

The marketable securities held by the Company were as follows:

 

   Total 
Balance at December 31, 2024  $2,358 
Additions   250 
Proceeds from disposition   (670)
Realized gain on disposition   58 
Unrealized net gain   5,787 
Balance at December 31, 2025  $7,783 
Additions    44,175 
Proceeds from disposition   (7,645)
Realized net gain on disposition   1,169 
Unrealized net loss   (1,820)
Balance at September 30, 2026  $43,662 

 

In March 2026, following Dolly Varden Silver Corporation’s (“Dolly Varden”) merger with Contango Ore, Inc., the Company’s investment in Dolly Varden was converted into Contango Silver and Gold Inc. (“Contango”) shares. Prior to the transaction, the Company exercised significant influence over Dolly Varden and accounted for the investment using the equity method. Following the exchange, the Company does not have significant influence over Contango, and accounts for the investment as a financial asset in accordance with IFRS 9.

 

As a result of the transaction, the Company derecognized its investment in Dolly Varden and recognized its investment in Contango at fair value ($44,175), resulting in the recognition of a gain of $19,241 in profit or loss. During the period, the Company disposed of securities for proceeds of $7,645; the gain on disposal of $1,169 represents the remeasurement to fair value for the period prior to disposal.

 

Note 4: Mineral property interests

 

The Company’s principal resource properties are located in Canada. A summary of the carrying amounts is as follows:

 

   Quebec   Nunavut   Total 
Balance at December 31, 2024  $37,100   $8,100   $45,200 
Additions   5,436    -    5,436 
Change in estimate of provision for site reclamation and closure   (597)   (121)   (718)
Balance at December 31, 2025  $41,939   $7,979   $49,918 
Change in estimate of provision for site reclamation and closure   (275)   (40)   (315)
Balance at September 30, 2026  $41,664   $7,939   $49,603 

 

Note 5: Flow-through share premium liability

 

Flow-through shares are issued at a premium, calculated as the difference between the price of a flow-through share and the price of a common share at that date. Tax deductions generated by eligible expenditures are passed through to the shareholders of the flow-through shares once the eligible expenditures are incurred and renounced.

 

On October 14, 2025, the Company completed two offerings and raised $18,000 through the issuance of (i) 9,915,000 flow-through units and (ii) 6,003,000 common shares designated as flow-through shares. The flow-through proceeds will be used for the Company’s mineral exploration activities. The Company expects to incur the full exploration expenditures of $18,000 before December 31, 2026.

 

On June 19, 2025, the Company completed an offering and raised $3,080 through the issuance of 3,999,701 common shares designated as flow-through shares. The flow-through proceeds were used for the Company’s mineral exploration activities.

 

Fury Gold Mines Limited

Notes to the Q3 2026 Condensed Interim Consolidated Financial Statements

(Expressed in thousands of Canadian dollars, except where noted - Unaudited) 

7

 

The flow-through share funding and expenditures along with the corresponding impact on the flow-through share premium liability were as follows:

 

   Flow-through funding
(expenditures)
   Flow-through
premium liability
 
Balance at December 31, 2024  $2,335   $944 
Flow-through eligible expenditures   (2,335)   (944)
Flow-through funds raised   21,080    1,246 
Flow-through eligible expenditures   (4,259)   (456)
Balance at December 31, 2025  $16,821   $790 
Flow-through eligible expenditures   (16,096)   (756)
Balance at September 30, 2026  $725   $34 

 

Note 6: Segmented information - Exploration and evaluation costs

 

For the three months ended September 30, 2026, the Company’s exploration and evaluation costs were as follows:

 

   Quebec   Nunavut   Total 
Assaying  $419   $128   $547 
Exploration drilling   1,764    681    2,445 
Camp cost, equipment and field supplies   605    205    810 
Geological consulting services   419    773    1,192 
Geophysical analysis   745    -    745 
Permitting, environmental and community costs   98    220    318 
Expediting and mobilization   12    38    50 
Salaries and wages   524    269    793 
Fuel and consumables   250    -    250 
Aircraft and travel   277    1,228    1,505 
Consultancy and development studies   1,626    -    1,626 
Share-based compensation   25    2    27 
Total for the three months ended September 30, 2026  $6,764   $3,544   $10,308 

 

For the three months ended September 30, 2025, the Company’s exploration and evaluation costs were as follows:

 

   Quebec   Nunavut   Total 
Assaying  $392   $157   $549 
Exploration drilling   330    490    820 
Camp cost, equipment and field supplies   294    176    470 
Geological consulting services   1    205    206 
Permitting, environmental and community costs   32    55    87 
Expediting and mobilization   4    52    56 
Salaries and wages   349    431    780 
Fuel and consumables   74    18    92 
Aircraft and travel   343    872    1,215 
Share-based compensation   5    15    20 
Total for the three months ended September 30, 2025  $1,824   $2,471   $4,295 

 

Fury Gold Mines Limited

Notes to the Q3 2026 Condensed Interim Consolidated Financial Statements

(Expressed in thousands of Canadian dollars, except where noted - Unaudited) 

8

 

For the nine months ended September 30, 2026, the Company’s exploration and evaluation costs were as follows:

 

   Quebec   Nunavut   Total 
Assaying  $1,664   $241   $1,905 
Exploration drilling   4,301    1,019    5,320 
Camp cost, equipment and field supplies   1,586    301    1,887 
Geological consulting services   1,537    933    2,470 
Geophysical analysis   1,317    -    1,317 
Permitting, environmental and community costs   367    365    732 
Expediting and mobilization   18    312    330 
Salaries and wages   1,574    471    2,045 
Fuel and consumables   806    -    806 
Aircraft and travel   500    2,021    2,521 
Consultancy and development studies   2,739    -    2,739 
Share-based compensation   125    3    128 
Total for the nine months ended September 30, 2026  $16,534   $5,666   $22,200 

 

For the nine months ended September 30, 2025, the Company’s exploration and evaluation costs were as follows:

 

   Quebec   Nunavut   Total 
Assaying  $854   $179   $1,033 
Exploration drilling   1,049    570    1,619 
Camp cost, equipment and field supplies   667    291    958 
Geological consulting services   41    213    254 
Permitting, environmental and community costs   189    157    346 
Expediting and mobilization   6    117    123 
Salaries and wages   1,017    473    1,490 
Fuel and consumables   461    898    1,359 
Aircraft and travel   1,152    1,047    2,199 
Share-based compensation   82    26    108 
Total for the nine months ended September 30, 2025  $5,518   $3,971   $9,489 

 

Note 7: Share-based compensation and warrant reserve

 

(a)Share-based compensation expense

 

The Company uses the fair value method of accounting for all share-based payments to directors, officers, employees, and other service providers. During the three and nine months ended September 30, 2026 and 2025, the Company recognized share-based compensation expense as follows:

 

   Three months ended
September 30
   Nine months ended
September 30
 
   2026   2025   2026   2025 
Recognized in net loss and included in:                    
Exploration and evaluation costs  $27   $20   $128   $108 
Fees, salaries and other employee benefits   236    144    1,020    427 
Total share-based compensation expense  $263   $164   $1,148   $535 

 

Fury Gold Mines Limited

Notes to the Q3 2026 Condensed Interim Consolidated Financial Statements

(Expressed in thousands of Canadian dollars, except where noted - Unaudited) 

9

 

A summary of share-based compensation expense by categories for the period is as follows:

 

   Three months ended
September 30
   Nine months ended
September 30
 
   2026   2025   2026   2025 
Share options  $64   $10   $215   $42 
Restricted share units   123    113    561    376 
Deferred share units   76    41    372    117 
Total share-based compensation expense  $263   $164   $1,148   $535 

 

During the three and nine months ended September 30, 2026, the Company granted nil and 760,000 share options, respectively (three and nine months ended September 30, 2025 – nil and 140,000, respectively), to certain employees and consultants who provide defined on-going services to the Company, representative of employee service.

 

The weighted average fair value per option of these share options for the three and nine months ended September 30, 2026 were calculated as nil and C$0.49, respectively (three and nine months ended September 30, 2025 – nil and C$0.38, respectively) using the Black-Scholes option valuation model at the grant date with the following weighted average assumptions:

 

   Three months ended
September 30
   Nine months ended
September 30
 
   2026   2025   2026   2025 
Risk-free interest rate   -    -    3.07%   2.99%
Expected dividend yield   -    -    Nil    Nil 
Share price volatility   -    -    71%   71%
Expected life in years   -    -    5.0    5.0 

 

The risk-free interest rate assumption is based on the Government of Canada benchmark bond yields and treasury bills with a remaining term that approximates the expected life of the share-based options. The expected volatility assumption is based on the historical and implied volatility of the Company’s common shares.

 

The number of share options issued and outstanding and the weighted average exercise price were as follows:

 

  

 

 

Number of

share options

   Weighted
average
exercise price
(C$/option)
 
Outstanding, December 31, 2024   8,221,178   $1.14 
Granted   140,000    0.65 
Granted as part of QPM acquisition   282,470    1.92 
Exercised   (231,000)   0.55 
Expired   (1,838,144)   2.00 
Forfeited   (235,000)   1.12 
Outstanding, December 31, 2025   6,339,504   $0.94 
Granted   760,000    0.81 
Expired   (1,402,230)   1.07 
Outstanding, September 30, 2026   5,697,274   $0.89 

 

Fury Gold Mines Limited

Notes to the Q3 2026 Condensed Interim Consolidated Financial Statements

(Expressed in thousands of Canadian dollars, except where noted - Unaudited) 

10

 

As at September 30, 2026, the number of share options outstanding was as follows:

 

    Options outstanding    Options exercisable 
Exercise
price ($/option)
   Number of
shares
    Weighted
average
exercise price
(C$/option)
    Weighted
average
remaining life
(years)
    Number of
shares
    Weighted
average
exercise price
(C$/option)
    Weighted
average
remaining life
(years)
 
C$0.53 – C$0.99   3,324,500    0.80    2.21    2,855,750    0.79    1.83 
C$1.00 – C$1.85   2,361,659    1.01    0.48    2,361,659    1.01    0.48 
C$2.05 – C$3.91   11,115    2.29    0.45    11,115    2.29    0.45 
    5,697,274    0.89    1.49    5,228,524    0.90    1.21 

 

(b)Long-term incentive plan

 

On June 29, 2023, the Company adopted a Long-Term Incentive Plan (“LTI Plan”) which strives to accelerate and encourage additional share ownership by its employees, officers and directors. The LTI plan provides for the awarding of share options, performance share units, restricted share units (RSUs) and deferred share units (DSUs). The LTI Plan limits the number of shares reserved for issuance under the LTI Plan, together with all other security-based compensation arrangements of the Company, to a maximum of 10% of the Common Shares issued and outstanding. The plan was renewed mostly unchanged by shareholders on June 26, 2026.

 

On April 23, 2026, the Company issued 25,000 RSU’s to an officer. The RSU’s were issued in accordance with the Company’s LTI plan, with a grant-date fair value of C$0.81 per unit, one third vesting annually on anniversary with the first trench vested immediately.

 

On January 23, 2026, the Company issued 100,000 DSU’s to a director. The DSU’s were issued in accordance with the Company’s LTI plan, with a grant-date fair value of C$1.08 per unit, one third vesting annually on anniversary with the first trench vested immediately.

 

On January 9, 2026, the Company issued 430,000 DSU’s to directors and 885,000 RSU’s to officers and employees. The DSU’s and RSU’s were issued in accordance with the Company’s LTI plan, with a grant-date fair value of C$0.81 per unit, one third vesting annually on anniversary with the first trench vested immediately.

 

On January 9, 2025, the Company issued 590,000 DSU’s to directors and 1,142,500 RSU’s to officers and employees. The DSU’s and RSU’s were issued in accordance with the Company’s LTI plan, with a grant-date fair value of C$0.55 per unit, one third vesting annually on anniversary.

 

The number of RSU’s and DSU’s issued and outstanding and the weighted average grant date fair value were as follows:

 

   Number of
RSU’s
  

Number of

DSU’s (1)

   Weighted
Average grant date
fair value (C$ share)
 
Outstanding, December 31, 2024   1,146,080    -   $0.57 
Granted   1,142,500    590,000    0.55 
Settled   (382,027)   -    0.53 
Forfeited   (179,597)   (110,000)   0.56 
Outstanding, December 31, 2025   1,726,956    480,000   $0.56 
Granted   910,000    530,000    0.83 
Settled   (988,896)   -    0.64 
Forfeited   (288,323)   -    0.65 
Outstanding, September 30, 2026   1,359,737    1,010,000   $0.68 

 

 (1)As at September 30, 2026, 336,667 DSU’s have vested.

 

Fury Gold Mines Limited

Notes to the Q3 2026 Condensed Interim Consolidated Financial Statements

(Expressed in thousands of Canadian dollars, except where noted - Unaudited) 

11

 

(c)Share purchase warrants

 

In connection with the Quebec Precious Metals Corporation (“QPM”) acquisition in 2025, all warrants of QPM became exercisable to acquire common shares of the Company, in amounts and at exercise prices adjusted in accordance with the Exchange Ratio. As a result, 596,808 warrants, each exercisable into one Fury Gold share, were granted on May 31, 2025 and June 21, 2025 at an exercise price of C$1.35 per share. The total fair value of the warrants issued was $30, calculated using the Black-Scholes valuation model with the following inputs: (i) expected life – 2.12 years; (ii) expected volatility – 57%; (iii) expected dividend yield – 0%; (iv) risk-free interest rate – 2.56%; (v) share price – C$0.54.

 

On May 26, 2025, in connection with a non-brokered private equity placement, the Company issued 6,728,000 warrants exercisable into one common share of the Company at a price of C$0.80 for a period of three years. The warrants were classified as equity instruments under IAS 32 and measured at a fair value of $949, calculated using the Black-Scholes valuation model with the following inputs: (i) expected life – 3 years; (ii) expected volatility – 58%; (iii) expected dividend yield – 0%; (iv) risk-free interest rate – 2.7%; (v) share price – C$0.51.

 

On October 14, 2025, in connection with the issuance of flow-through units, the Company issued 4,957,500 warrants exercisable to one common share of the Company at a price of C$1.20 for a period of two years. The warrants were classified as equity instruments under IAS 32 and measured at a fair value of $1,296, calculated using the Black-Scholes valuation model with the following inputs: (i) expected life – 2 years; (ii) expected volatility – 60%; (iii) expected dividend yield – 0%; (iv) risk-free interest rate – 2.5%; (v) share price – C$0.99.

 

On November 12, 2025, in connection with a non-brokered private equity placement, the Company issued 747,127 warrants exercisable into one common share of the Company at a price of C$1.20 for a period of two years. The warrants were classified as equity instruments under IAS 32 and measured at a fair value of $125, calculated using the Black-Scholes valuation model with the following inputs: (i) expected life – 2 years; (ii) expected volatility – 63%; (iii) expected dividend yield – 0%; (iv) risk-free interest rate – 2.5%; (v) share price – C$0.77.

 

The number of share purchase warrants outstanding as at September 30, 2026 was as follows:

 

   Warrants
outstanding
   Weighted
average
exercise price
(C$/share)
 
Outstanding, December 31, 2024   -    - 
Issued   13,029,435    1.00 
Outstanding, December 31, 2025 and September 30, 2026   13,029,435   $1.00 

 

The following table reflects the share purchase warrants issued and outstanding as at September 30, 2026:

 

Expiry date  Warrants
outstanding
   Exercise price
(C$/share)
 
May 31, 2027   274,170   $1.35 
June 21, 2027   322,638    1.35 
October 14, 2027   4,957,500    1.20 
November 12, 2027   747,127    1.20 
May 26, 2028   6,728,000    0.80 
Total   13,029,435   $1.00 

 

Note 8: Related-parties transactions

 

On April 1, 2022, the Company purchased a 25% share interest in UMS, a private shared services provider, for nominal consideration. The Company funded, in addition to its nominal investment in UMS, a cash deposit of $150 which is held by UMS for the purposes of general working capital, and which will be returned to the Company upon termination of the UMS Canada arrangement, net of any residual unfulfilled obligations. UMS is the private company through which its shareholders, including Fury Gold, share geological, financial, and transactional advisory services as well as administrative services on a full, cost recovery basis.

 

Fury Gold Mines Limited

Notes to the Q3 2026 Condensed Interim Consolidated Financial Statements

(Expressed in thousands of Canadian dollars, except where noted - Unaudited) 

12

 

As part of the UMS arrangement, the Company is contractually obliged to pay certain rental expenses in respect of a ten-year office lease entered into by UMS on July 1, 2021. As at September 30, 2026, the Company expects to incur approximately $69 in respect of its share of future rental expense of UMS.

 

A summary of the Company’s transactions with UMS was as follows:

 

   Three months ended
September 30
   Nine months ended
September 30
 
   2026   2025   2026   2025 
Exploration and evaluation costs  $291   $187   $455   $260 
General and administration   52    48    174    180 
Total transactions for the period  $343   $235   $629   $440 

 

Remuneration of Fury Gold’s board of directors and certain executive officers of the Company, including the CEO, Chief Financial Officer (“CFO”), Senior Vice President, and Vice President was as follows:

 

   Three months ended
September 30
   Nine months ended
September 30
 
   2026   2025   2026   2025 
Short-term benefits provided to executives (a)   $335   $260   $970   $787 
Directors’ fees paid to non-executive directors   73    60    216    191 
Share-based payments   186    151    834    443 
Total  $594   $471   $2,020   $1,421 

 

 (a)Short-term employee benefits include salaries, bonus, and other employee benefits.

 

Note 9: Supplemental cash flow information

 

The impact of changes in non-cash working capital was as follows:

 

   Nine months ended
September 30
 
   2026   2025 
Accounts receivable  $(314)  $(260)
Prepaid expenses and deposits   (661)   (114)
Accounts payable and accrued liabilities   2,868    189 
Deferred government grant   (22)   (37)
Changes in non-cash working capital  $1,871   $(222)

 

Note 10: Loss per share

 

For the three and nine months ended September 30, 2026 and 2025, the weighted average number of shares outstanding and loss per share were as follows:

 

   Three months ended
September 30
   Nine months ended
September 30
 
   2026   2025   2026   2025 
Net loss  $7,799   $4,699   $7,607   $9,687 
Weighted average basic number of shares outstanding   190,098,594    166,338,451    190,096,267    161,569,043 
Basic loss per share  $0.04   $0.03   $0.04   $0.06 
Weighted average diluted number of shares outstanding   190,098,594    166,338,451    190,096,267    161,569,043 
Diluted loss per share  $0.04   $0.03   $0.04   $0.06 

 

Diluted earnings per share were calculated by adjusting the weighted average number of shares to reflect the assumed exercise of dilutive share options and the vesting of unvested restricted share units outstanding during the period; profit for the year was not adjusted as no interest or dividends would have been avoided on conversion. Share purchase warrants and share options were not included in the calculation as they are anti-dilutive.

 

Fury Gold Mines Limited

Notes to the Q3 2026 Condensed Interim Consolidated Financial Statements

(Expressed in thousands of Canadian dollars, except where noted - Unaudited) 

13

 

Note 11: Financial instruments

 

The Company’s financial instruments as at September 30, 2026, consisted of cash, marketable securities, accounts receivable, other investment, deposits, and accounts payable and accrued liabilities. The fair values of these financial instruments approximate their carrying values, unless otherwise noted.

 

(a)Financial assets and liabilities by categories

 

   At September 30, 2026   At December 31, 2025 
   Amortized
Cost
   FVTPL   Total   Amortized
Cost
   FVTPL   Total 
Cash  $5,784   $-   $5,784   $21,197   $-   $21,197 
Marketable securities   -    43,662    43,662    -    7,783    7,783 
Other investment   -    2,128    2,128    -    2,031    2,031 
Deposits   553    -    553    66    -    66 
Accounts receivable   709    -    709    395    -    395 
Total financial assets  $7,046   $45,790   $52,836   $21,658   $9,814   $31,472 
Accounts payable and accrued liabilities   (4,891)   -    (4,891)   (2,023)   -    (2,023)
Deferred government grant   -    -    -    (22)   -    (22)
Total financial liabilities  $(4,891)  $-   $(4,891)  $(2,045)  $-   $(2,045)

 

(b)Financial assets and liabilities measured at fair value

 

The categories of the fair value hierarchy that reflect the significance of inputs used in making fair value measurements are as follows:

 

Level 1 – fair values based on unadjusted quoted prices in active markets for identical assets or liabilities;

 

Level 2 – fair values based on inputs that are observable for the asset or liability, either directly or indirectly; and

 

Level 3 – fair values based on inputs for the asset or liability that are not based on observable market data.

 

The Company’s policy to determine when a transfer occurs between levels is to assess the impact at the date of the event or the change in circumstances that could result in a transfer. No transfers occurred between the levels during the year.

 

As at September 30, 2026, the Company’s financial instruments measured at fair value on a recurring basis were the Company’s marketable securities which were classified as Level 1, and other investment which were classified as Level 3. There were no financial assets or financial liabilities measured and recognized in the consolidated statements of financial position at fair value that would be categorized as level 2 in the fair value hierarchy.

 

   Level 1   Level 2   Level 3   Total 
Marketable securities  $43,662   $-   $-   $43,662 
Other investment   -    -    2,128    2,128 
Total  $43,662   $-   $2,128   $45,790 

 

Fury Gold Mines Limited

Notes to the Q3 2026 Condensed Interim Consolidated Financial Statements

(Expressed in thousands of Canadian dollars, except where noted - Unaudited) 

14

 

On August 13, 2024, the Company purchased 764,993 Series C Preferred Shares of Alsym Energy Inc. for a total cash purchase price of US$1,500 ($2,063). This investment represents less than 1% of the equity of Alsym Energy Inc and is accounted for as an investment in equity instruments. This investment is classified as a Level 3 Financial Asset and is accounted for at its fair value and revalued at each reporting date through profit and loss. As at September 30, 2026, the fair value of the investment continues to be measured by reference to the price of the 2024 Series C financing, which management considers the best available estimate of fair value in the absence of more recent observable information.

 

The reconciliation of the Company’s level 3 financial instrument is as follows:

 

   Total 
Balance at December 31, 2024  $2,063 
Translation adjustment recognized in net loss for the year   (32)
Balance at December 31, 2025  $2,031 
Translation adjustment recognized in net loss for the period   97 
Balance at September 30, 2026  $2,128 

 

(c)Financial instruments and related risks

 

The Company’s financial instruments are exposed to liquidity risk, credit risk and market risks, which include currency risk, interest rate risk and price risk. As at September 30, 2026, the primary risks were as follows:

 

Liquidity risk

 

Liquidity risk is the risk that the Company will encounter difficulty in meeting obligations associated with financial liabilities. The Company proactively manages its capital resources and has in place a budgeting and cash management process to help determine the funds required to ensure the Company has the appropriate liquidity to meet its current exploration plans and achieve its growth objectives. The Company ensures that there is sufficient liquidity available to meet its short-term business requirements, taking into account its anticipated cash outflows from exploration activities, and its holdings of cash and marketable securities. The Company monitors and adjusts, when required, these exploration programs as well as corporate administrative costs to ensure that adequate levels of working capital are maintained.

 

As at September 30, 2026, the Company had unrestricted cash of $5,784 (December 31, 2025 – $21,197), working capital surplus of $48,611 (December 31, 2025 – $29,162), which the Company defines as current assets less current liabilities, and an accumulated deficit of $271,258 (December 31, 2025 – $263,651). During the three and nine months ended September 30, 2026, Fury Gold had a comprehensive loss of $7,797 and $7,604, respectively (three and nine months ended September 30, 2025 – a comprehensive loss of $4,701 and $9,693, respectively). Although the Company has been successful in the past in obtaining financing, there is no assurance that it will be able to obtain adequate financing in the future or that such financing will be on terms advantageous to the Company. However, the Company has $43,662 (December 31, 2025 – $7,783) in free trading marketable securities to fund operations for at least the next twelve months.

 

The Company’s contractual obligations are as follows:

 

   Within 1 year   2 to 3
years
   Over 3
years
   At
September 30,
2026
   At
December 31,
2025
 
Accounts payable and accrued liabilities  $4,891   $-   $-   $4,891   $2,023 
Deferred government grant   -    -    -    -    22 
Flow-through share premium liability (note 5)   34    -    -    34    790 
Total  $4,925   $-   $-   $4,925   $2,835 

 

The Company also makes certain payments arising on mineral claims and leases on an annual or bi-annual basis to ensure all the Company’s properties remain in good standing. The Company estimates that $575 of payments arising on mineral claims and leases will be payable during the year ended December 31, 2026.

 

Fury Gold Mines Limited

Notes to the Q3 2026 Condensed Interim Consolidated Financial Statements

(Expressed in thousands of Canadian dollars, except where noted - Unaudited) 

15

 

Credit risk

 

The Company’s cash and accounts receivables are exposed to credit risk, which is the risk that the counterparties to the Company’s financial instruments will cause a loss to the Company by failing to pay their obligations. The amount of credit risk to which the Company is exposed is considered insignificant as the Company’s cash is held with highly rated financial institutions in interest-bearing accounts and the accounts receivable primarily consist of sales tax receivables.

 

Market risk

 

This is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of changes in market prices. The significant market risks to which the Company is exposed are as follows:

 

i.Currency risk

 

The Company is exposed to currency risk by having balances and transactions in currencies that are different from the relevant functional currency (the Canadian dollar). A 10% increase or decrease in the US dollar to Canadian dollar exchange rate would not have a material impact on the Company’s net loss.

 

ii.Price risk

 

The Company holds certain investments in marketable securities (note 3) which are measured at fair value, being the closing share price of each equity security at the date of the consolidated statements of financial position. The Company is exposed to changes in share prices which would result in gains and losses being recognized in the loss for the year. A 10% increase or decrease in the Company’s marketable securities share prices would have a material impact on the Company’s net loss.

 

 

 

 

Fury Gold Mines Limited
Notes to the Q3 2026 Condensed Interim Consolidated Financial Statements

(Expressed in thousands of Canadian dollars, except where noted - Unaudited)

16

 

 Exhibit 99.2

 

 

 

 

 

 

 

 

 

 

(An exploration company)

 

 

 

 

MANAGEMENT’S DISCUSSION AND ANALYSIS

 

 

FOR THE THREE AND NINE MONTHS ENDED SEPTEMBER 30, 2026

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MANAGEMENT’S DISCUSSION AND ANALYSIS

OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

FOR THE THREE AND NINE MONTHS ENDED SEPTEMBER 30, 2026

 

This Management’s Discussion and Analysis (the “MD&A”) for Fury Gold Mines Limited (“Fury Gold” or the “Company”) should be read in conjunction with the condensed interim consolidated financial statements of the Company and related notes thereto for the three and nine months ended September 30, 2026. The unaudited condensed interim consolidated financial statements have been prepared in accordance with IFRS Accounting Standards as issued by the International Accounting Standards Board, applicable to the preparation of interim financial statements under International Accounting Standard 34 - Interim Financial Reporting. All dollar amounts presented are expressed in thousands of Canadian dollars unless otherwise stated. Amounts presented in this MD&A may be rounded. The effective date of this MD&A is November 13, 2026.

 

Section 1: Forward-looking statements and risk factors 2
Section 2: Business Overview 4
Section 3: Q3 2026 Highlights and subsequent events 4
Section 4: Projects overview 5
Section 5: Review of quarterly financial information 9
Section 6: Financial position, liquidity, and capital resources 11
Section 7: Financial risk summary 15
Section 8: Related party transactions and balances 15
Section 9: Critical accounting estimates and judgments 16
Section 10: Controls and procedures 17

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fury Gold Mines Limited
Management’s Discussion and Analysis of Financial Condition and

Results of Operations for the Three and Nine months ended September 30, 2026

(Amounts expressed in thousands of Canadian dollars, unless otherwise noted)

1

 

Section 1: Forward-looking statements and risk factors

 

1.1 Forward-looking statements

 

Certain statements made in this MD&A contain forward-looking information within the meaning of applicable Canadian and United States securities laws (“forward-looking statements”). These forward-looking statements are presented for the purpose of assisting the Company’s securityholders and prospective investors in understanding management’s views regarding those future outcomes and may not be appropriate for other purposes. When used in this MD&A, the words “may”, “would”, “could”, “will”, “intend”, “plan”, “anticipate”, “believe”, “seek”, “propose”, “estimate”, “expect”, and similar expressions, as they relate to the Company, are intended to identify forward-looking statements. Specific forward-looking statements in this MD&A include, but are not limited to: the Company’s exploration plans and objectives and the timing and costs of these plans; future capital expenditures and requirements, and sources and timing of additional financing; the timing, costs and success of the Company’s exploration activities, estimates of the Company’s mineral resources; the realization of mineral resource estimates; any objectives, expectations, intentions, plans, results, levels of activity, goals or achievements; capital expenditures; the Company’s plans for its marketable securities in Contango Silver & Gold Inc. (a successor to Dolly Varden Silver Corporation) and the realization of carrying values of these and any other securities held for resale. Additional factors include liabilities related to unused tax benefits or flow-through obligations; statements relating to the business, operations or prospects of the Company; and other events or conditions that may occur in the future.

 

The forward-looking statements contained in this MD&A represent the Company’s views only as of the date hereof and may change. Many assumptions are subject to risks and uncertainties, and so may prove to be incorrect, including the Company’s budget, including expected costs and the assumptions regarding market conditions and other factors upon which the Company has based its expenditure expectations; the Company’s ability to complete its planned exploration activities with its available working capital; the Company’s ability to raise additional capital to proceed with its exploration plans; the Company’s ability to obtain or renew the licences and permits necessary for exploration; the Company’s ability to obtain all necessary regulatory approvals, permits and licences for its planned exploration activities under governmental and other applicable regulatory regimes including the legally, mandated consultation process with affected First Nations; the Company’s ability to complete and successfully integrate acquisitions; the effects of climate change, extreme weather events, tariffs, water scarcity, wildfires, and seismic events, and the effectiveness of strategies to deal with these issues; the Company’s expectations regarding the demand for, and supply and price of, precious metals; the Company’s ability to recruit and retain qualified personnel; the Company’s resource estimates, and the assumptions upon which they are based; the Company’s ability to comply with current and future environmental, safety and other regulatory requirements.

 

The foregoing is not an exhaustive list of the risks and other factors that may affect any of the Company’s forward-looking statements. Readers should refer to the risks discussed herein and in the Company’s Annual Information Form (the “Annual Information Form”) for the year ended December 31, 2025, subsequent disclosure filings with the Canadian Securities Administrators, the Company’s registration statement on Form 40-F for the year ended December 31, 2025 filed with the United States Securities and Exchange Commission (the “SEC”), and subsequent disclosure filings with the SEC, available on SEDAR+ at www.sedarplus.com and with the SEC at www.sec.gov, as applicable.

 

The Company does not undertake to update any forward-looking statements, except to the extent required by applicable securities laws in future disclosure filings.

 

Readers are cautioned not to place heavy reliance on forward looking statements.

 

Cautionary Note to United States Investors concerning Estimates of Measured, Indicated, and Inferred Resource Estimates:

 

The mineral project technical information in this document has been prepared in accordance with NI 43-101, and the information contained herein may not be comparable to similar information disclosed by similar exploration companies reporting under S-K 1300. United States investors are cautioned that NI 43-101 and S-K 1300 differ in certain material respects as described above, and that the technical disclosure herein may not meet all requirements applicable to SEC-reporting companies.

 

Fury Gold Mines Limited
Management’s Discussion and Analysis of Financial Condition and

Results of Operations for the Three and Nine months ended September 30, 2026

(Amounts expressed in thousands of Canadian dollars, unless otherwise noted)

2

 

There is no assurance any mineral resources that the Company may report resources with sequentially lower confidence levels referred to as “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” under NI 43- 101 would be the same had the Company prepared the resource estimates under the standards adopted under the Regulation S-K 1300. United States investors are also cautioned that while the SEC will now recognize “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources”, investors should not assume that any part or all of the mineralization in these categories will ever be converted into the next higher category of mineral resources or ultimately into mineral reserves. Mineralization described using these terms has a greater amount of uncertainty as to their existence and feasibility than mineralization that has been characterized as reserves.

 

The Company currently has no mineral resources which qualify as mineral reserves which requires that the estimated resources be demonstrated to be economic in at least a pre-feasibility level (± 30% estimates tolerance) study. Accordingly, investors are cautioned not to assume that any “measured mineral resources”, “indicated mineral resources” or “inferred mineral resources” that the Company reports are or will be economically or legally mineable. In Canada, “inferred mineral resources” are subject to an expectation that there must be a reasonable probability of upgrading a majority of an inferred resource into a measured or indicated category, inferred resources have a greater amount of uncertainty as to their existence and as to whether they can be mined legally or economically. United States investors are also cautioned not to assume that all or any part of the “inferred mineral resources” exist. Under Canadian securities laws, estimates of “inferred mineral resources” cannot form the basis of feasibility or other economic studies, except in limited circumstances where permitted under NI 43-101.

 

Accordingly, information contained in this MD&A describing the Company’s mineral deposits may not be comparable to similar information made public by domestic U.S. companies which are subject to the reporting and disclosure requirements under the United States federal securities laws and the rules and regulations thereunder.

 

Change in U.S. Securities Reporting Obligations

 

Previously, the Company filed its annual report with the U.S. Securities and Exchange Commission (the "SEC") on Form 20-F as a foreign private issuer. Effective December 31, 2025, the Company determined that it satisfies the eligibility requirements to register its securities and file its annual report under the Multijurisdictional Disclosure System ("MJDS") established jointly by the SEC and the Canadian Securities Administrators ("CSA").

 

Accordingly, for fiscal 2025, the Company has transitioned from filing its annual report on Form 20-F to filing on Form 40-F under the MJDS. Commencing with the annual report for the fiscal year ended December 31, 2025, the Company filed its annual report with the SEC on Form 40-F. This form permits eligible Canadian issuers to satisfy their SEC reporting obligations primarily by filing disclosure documents prepared in accordance with Canadian securities laws and filed on the System for Electronic Document Analysis and Retrieval ("SEDAR+").

 

Exchange Act Registration and Ongoing Obligations

 

The Company's common shares are registered under Section 12(g) of the Exchange Act. The Company will continue to comply with all applicable obligations arising under the Exchange Act, including the filing of annual reports on Form 40-F, the filing of Reports on Form 6-K to furnish material information to the SEC on an ongoing basis; and compliance with the applicable provisions of the Sarbanes-Oxley Act of 2002 and the rules and regulations promulgated thereunder, to the extent applicable to MJDS filers.

 

1.2       Qualified persons and technical disclosures

 

Valerie Doyon, P.Geo., Vice President, Geology, of the Company is the Company’s “qualified person” or “QP” under and for the purposes of NI 43-101 with respect to assuming responsibility for the technical disclosures in this MD&A.

 

Fury Gold Mines Limited
Management’s Discussion and Analysis of Financial Condition and

Results of Operations for the Three and Nine months ended September 30, 2026

(Amounts expressed in thousands of Canadian dollars, unless otherwise noted)

3

 

Section 2: Business Overview

 

Fury Gold is a Canadian-focused gold exploration company whose four material projects are strategically positioned in two prolific mining regions: the Eeyou Istchee James Bay Region in Quebec and the Kitikmeot Region in Nunavut.

 

The Company, incorporated on June 9, 2008 under the Business Corporations Act (British Columbia), has operated continuously as a mineral exploration company since then, and is now listed on the Toronto Stock Exchange and the NYSE-American, with its common shares trading under the symbol FURY. The Company’s registered and records office is located in care of its Canadian attorneys at 1055 West Georgia Street, Suite 1500, Vancouver, British Columbia, V6E 4N7, and its mailing address is 401 Bay Street, 16th Floor, Toronto, Ontario, M5H 2Y4.

 

At September 30, 2026, the Company had four material mineral projects: Committee Bay in Nunavut, and Eau Claire, Sakami and Éléonore South in Quebec.

 

During March 2026, the Company’s previously held Dolly Varden Silver Corporation (“Dolly Varden”) common shares were exchanged for shares of Contango Silver & Gold Inc. (“Contango“) common shares as part of a merger between these two companies and at March 31, 2026 these Contango shares were reclassified as Marketable Securities as the Company’s holding was diluted below 10%.

 

The Company is a junior resource exploration issuer and as such is an expenditure-based business and does not have revenues from mining operations. The CEO, who is the chief operating decision maker (“CODM”), reviews the operating segments of the Company, and has determined that there are two reportable geographical segments (Quebec and Nunavut). The Company’s focus is on the acquisition, exploration, and development of mineral resource properties within Quebec and Nunavut. Its business success must be measured primarily by the success of its exploration programs in establishing that the Company’s mineral properties contain potential commercial deposits of precious metals.

 

Section 3: Q3 2026 Highlights and subsequent events

 

3.1 Operational highlights in Q3 and to date of filing

 

§On November 3 the Company announced the assay results of the first five diamond drill holes of its 2026 drill program at its Committee Bay gold project which included a total of 11 diamond drill holes totalling 4,219 metres (m), including five infill holes at the Three Bluffs deposit. The reported results come from infill drilling designed to increase drill density within the main portion of the existing Three Bluffs mineral resource and support improved confidence in geological and grade continuity.

 

Significant drill highlights of the five infill holes included: Hole 26TB158 intersected 3.88 grams per tonne (“g/t”) gold (“Au”) over 17.82 m, including 18.78 g/t Au over 3.30 m; Hole 26TB161 intersected 0.77 g/t Au over 98.60 m, including 65.60 g/t Au over 0.56 m, the widest mineralized interval drilled to date; Hole 26TB160 intersected 0.92 g/t Au over 31.45 m, including 12.35 g/t Au over 1.18 m, and 0.99 g/t Au over 28.83 m; Hole 26TB163 intersected 0.72 g/t Au over 36.58 m, including 2.65 g/t Au over 3.31 m. All five holes intersected the Three Bluffs shear zone, with widths ranging from 17 m to 99 m. 4,219 m (or 11 drill holes), including one abandoned hole, for the 2026 Committee Bay program has been completed. Assay results are pending for five of these holes, two of which are extension holes.

 

§On October 26, 2026, the Company announced additional results from its ongoing Phase 2 drill program at the Eau Claire Gold Project. Highlights include hole 26EC-131 which intersected 14.95 grams per tonne gold over 4.25m, hole 26EC-130 that intersected 13.15 g/t Au over 1.50m, hole 26EC-132 that intersected 6.81 g/t Au over 1.39m and hole 26EC-122 which intersected 7.03 g/t Au over 1.50m.

 

§On August 25, 2026, the Company announced the third batch of assay results from the ongoing Phase 2 infill drill program at the Eau Claire gold project. All of the holes targeted areas currently classified as inferred mineral resources. Highlights include hole 26EC-125 intersected 14.41 g/t gold over 3.92 m and 7.74 g/t gold over 1.96 m, hole 26EC-118 intersected 4.49 g/t gold over 2.94 m and 7.74 g/t gold over 1.96 m, hole 26EC-129 intersected 2.07 g/t gold over 4.94 m and 10.35 g/t gold over 0.99 m, holes 26EC-118 and 26EC-129 are in the same mineralized zone, about 250 m and 190 m up-dip from hole 26EC-115, final assays for 26EC-115 added 2.88 g/t gold over 8.00 m and 4.19 g/t gold over 4.00 m and hole 26EC-120 intersected 5.07 g/t gold over 6.00 m, including 10.20 g/t gold over 1.00 m.

 

§On July 13, 2026, the Company reported Phase 2 drill results from its Eau Claire Gold Project in northern Quebec, highlighted by drill hole 26EC-115, which returned 7.01 g/t gold over 21.0 metres, including 10.27 g/t gold over 11.0 metres. The company noted that no previous intercept at Eau Claire with a similar thickness has achieved such a high grade, underscoring the scale and quality of the mineralization. The results support the continuity of a high-grade gold zone and are helping convert inferred resources into higher-confidence categories for the ongoing prefeasibility study. Fury also mobilized a third diamond drill rig to accelerate drilling, expand resources, and test extensions of the high-grade shoot while continuing its broader 15,000-25,000 metre Phase 2 program.

 

Fury Gold Mines Limited
Management’s Discussion and Analysis of Financial Condition and

Results of Operations for the Three and Nine months ended September 30, 2026

(Amounts expressed in thousands of Canadian dollars, unless otherwise noted)

4

 

Section 4: Projects overview

 

 

Locations of the Company’s four material mineral projects and the currently non-material Kipawa rare earths project.

 

4.1 Indigenous community relations and environmental

 

The pursuit of environmentally sound and socially responsible mineral development guides all of Fury Gold’s activities as the Company understands the broad societal benefits that responsible mining can bring, as well as the risks that must be managed through the implementation of sustainable development practices. The Company strives to maintain the highest standards of environmental protection and aboriginal and local community engagement at all its projects.

 

The Company considers sustainability to include the pursuit of four mutually reinforcing pillars: environmental and cultural heritage protection; social and community development; economic growth and opportunity; and cultural intelligence development for all employees. The Company assesses the environmental, social, and financial benefits and risks of all business decisions and believes this commitment to sustainability generates value and benefits for local communities and shareholders.

 

The Company’s approach to Indigenous and stakeholder engagement provides opportunities and benefits through:

 

§the provision of jobs and training programs
§contracting opportunities
§capacity funding for Indigenous engagement
§sponsorship of community events
§supporting professional development opportunities, building cultural and community intelligence capacity.

 

The Company places a priority on creating mutually beneficial, long-term relationships with the communities in which it operates. Engagement goals include providing First Nation governments, communities, and residents with corporate and project-related information, including details of work programs, collaborative opportunities, and other activities being undertaken in the field.

 

4.2 Quebec

 

Fury Gold holds 100% interests in the Eau Claire project as well as interests in nine other properties covering approximately 142,000 hectares predominantly within the Eeyou Istchee James Bay region of Quebec. Through its acquisition of Quebec Precious Metals Corporation on April 28, 2025, the company acquired 100% interests in three projects: Sakami, Elmer East and Cheechoo – Eleonore Trend, and a 68% interest in the Heavy Rare Earth Elements (HREE) Kipawa project (the remaining 32% is held by Investissement Quebec).

 

Fury Gold Mines Limited
Management’s Discussion and Analysis of Financial Condition and

Results of Operations for the Three and Nine months ended September 30, 2026

(Amounts expressed in thousands of Canadian dollars, unless otherwise noted)

5

 

4.2.1       Eau Claire

 

The Eau Claire project is located immediately north of the Paix Des Braves reservoir, 10km northeast of Hydro Quebec’s EM-1 hydroelectric power facility, 80km north of the town of Nemaska, approximately 320km northeast of the town of Matagami, and 800km north of Montreal. This property consists of map-designated claims totaling approximately 23,000 hectares. These claims are held 100% by Fury Gold and are in good standing. Permits are obtained on a campaign basis for all surface exploration, particularly trenching and drilling, undertaken on the property.

 

The Eau Claire project is underlain by typical Archean greenstone assemblages of the Eastmain Greenstone Belt, which are composed of volcanic rocks of basaltic to rhyolitic composition and related clastic and chemical sedimentary rocks. These rocks have been intruded by an assemblage of mafic to felsic sills, stocks, and dykes. Metamorphism ranges from upper greenschist to amphibolite facies in the greenstone assemblages, while higher-grade facies, up to granulite level, typically characterize the Opinaca sub-province. Archean-aged deformation affects all rocks on the property. Near the Eau Claire deposit, the volcano-sedimentary assemblage has been folded, forming a closed antiform plunging gently to the west. Regional rock foliation and lithology are generally east-west in strike with moderate to sub-vertical southerly dips in the vicinity of the Eau Claire gold deposit.

 

On September 2, 2025, the Company announced the results of a Preliminary Economic Assessment (“PEA”) for the Eau Claire Gold Deposit which was conducted by the independent engineering firm SGS Geological Services. The PEA contemplates a primary underground mining operation complemented by 2 small open pits. Production from the underground (“UG”) mine will start in year minus 1 with a small bulk sample, with full UG operations continuing through to year 11. In total, the underground would produce 702koz gold at an average diluted head grade of 5.22 g/t gold from 4.40Mt of material. The conventional open pit (“OP”) mine would operate for 8 years, recovering a total of 132koz gold at an average diluted grade of 2.50 g/t gold from 1.73Mt of material.

 

The Company’s drilling, since October 2025 on the Eau Claire property, has focused on expanding mineral resources along high-grade shoots and improving continuity within the existing resource, particularly outside the stopes identified in the preliminary economic assessment. Phase 1, which included roughly 13,000m of drilling and included 21 holes during concluded in March 2026, with key highlights being drill hole 26EC-099, which targeted an inferred portion of the Eau Claire resource and intercepted 11.74 g/t gold over 6.63m, drill hole 26EC-101 which intersected 12.50 g/t gold over 7.02 m as well as drill hole 26EC-103 that intersected 9.43 g/t gold over 7.86m.

 

The Phase 2 drill campaign at the Eau Claire Gold Project is underway and focuses on converting Inferred portions of the mineral resource, and their extensions, to the Indicated category. The Company anticipates approximately 25,000 m of drilling in Phase 2, with the program continuing through the fall. Highlights to date include drill hole 26EC-115, which intersected 7.01 g/t gold over 21.0 m; drill hole 26EC-131, which intersected 14.95 g/t gold over 4.25 m; drill hole 26EC-125, which intersected 14.41 g/t gold over 3.92 m; and drill hole 26EC-120, which intersected 5.07 g/t gold over 6.00 m, including 10.20 g/t gold over 1.00 m. Drill holes 26EC-118 and 26EC-129 intersected the same mineralized zone as 26EC-115, approximately 250 m and 190 m up-dip, respectively.

 

In mid September, a 10 day prospection campaign was executed in the regional area of Eau Claire. Also, a magnetotelluric aerial survey was carried out over the entire Eau Claire property to help identify additional drill targets.

 

In addition to the ongoing exploration and infill drilling on the property, the Company has also engaged SGS Geological Services (“SGS”) and BBA Consultants (“BBA”) to assist the Company in advancing Eau Claire Pre-Feasibility Study work. Fury has also engaged Wassah a multidisciplinary firm specializing in environmental services, engineering and forestry to perform environmental baseline studies to be carried out over the next two years, will include field inventories of the various components of the natural and human environments, establishing baseline conditions for a future environmental impact assessment.

 

Fury Gold Mines Limited
Management’s Discussion and Analysis of Financial Condition and

Results of Operations for the Three and Nine months ended September 30, 2026

(Amounts expressed in thousands of Canadian dollars, unless otherwise noted)

6

 

The Company evacuated the Eau Claire property during July for roughly 2 weeks, due to ongoing wildfires in the area. The evacuation is not expected to have a material impact on the Company’s ongoing planned exploration or study work.

 

Percival to Serendipity trend:

 

The Serendipity Prospect is situated 16 km northeast of the Eau Claire Deposit and 6.5 km north northeast of the Percival Deposit along the Hashimoto Deformation Zone, which is related to the Cannard Deformation Zone, one of the primary controls on gold mineralization within the region. The 2024 drilling tested five robust distinct geochemical targets up to 150x background values proximal to the regional scale Hashimoto Deformation Zone within prospective folded stratigraphy across approximately 2 km of strike length. Limited historical drilling near Serendipity intercepted 7.9 m of 1.23 g/t gold; 12.1 m of 1.38 g/t gold and 1.5 m of 4.27 g/t gold.

 

Fury’s technical team has demonstrated the effectiveness of drilling biogeochemical anomalies in covered terrain within our project areas and continues to build a better understanding of the combination of pathfinder elements and structural controls on the gold mineralization along the Percival to Serendipity trend. Broad low-grade gold mineralization occurs along well-defined structural splays sub-parallel to the regional Cannard and Hashimoto Deformation Zones. Certain elemental associations, most notably Arsenic, Bismuth, and Tungsten, are proving to be important pathfinders for gold mineralization. Higher-grade gold within the broader corridor is controlled by secondary shearing and is identified by the high degree of silicification and alteration. The proximity of the main Cannard and Hashimoto Deformation Zones varies from one target to the other and Fury believes the varying degrees of deformation are an important control on both gold mineralization and the potential preservation of a sizeable, mineralized body.

 

The Company expects to incur approximately $12 annually in project maintenance costs, including certain mineral claims payments, in order to keep the properties in good standing in 2026.

 

4.2.2        Éléonore South

 

The 100% owned Éléonore South property is strategically located in an area of prolific gold mineralization within the Eeyou Istchee James Bay gold camp and is locally defined by Dhilmar’s Éléonore mine and Sirios Resources’ Cheechoo deposit. Exploration over the past 13 years has largely been focused on the extension of the Cheechoo deposit mineralization within the portion of the Cheechoo Tonalite on the Property. Approximately 27,000m of drilling in 172 drill holes, covering only a small proportion of the property at the Moni and JT prospects has been completed. Notable drill intercepts include 53.25m of 4.22 g/t gold (Au); 6.0m of 49.50 g/t Au including 1.0m of 294 g/t Au and 23.8m of 3.08 g/t Au including 1.5m of 27.80 g/t Au.

 

In September 2026, the Company completed a prospecting program on the west block of the Éléonore South property.

 

The Company expects to incur approximately $32 annually in project maintenance costs, including certain mineral claims payments, in order to keep the properties in good standing in 2026. No additional work is planned for 2026.

 

4.2.3        Sakami

 

The winter road accessible Sakami project covers approximately 14,250 hectares (ha), 30 km to the east of the paved Billy Diamond Highway. The Project straddles the prospective structural corridor marking the contact between the Opinaca and La Grande Geological subprovinces, where gold mineralization has been identified across over 23 km. Gold mineralization is located at the base of a sulphide rich horizon located along and proximal to regional-scale shearing, marking the contact between the two geological subprovinces.

 

On December 8, 2025, the Company announced an initial inferred mineral resource estimate for the La Pointe Extension target on the Sakami gold project, located in the Eeyou Istchee Territory of the James Bay region in Northern Quebec. The initial inferred mineral resource comprised 23.9 million tonnes grading 1.07 g/t gold for 825,000 gold ounces. The entirety of the inferred mineral resource is contained within a conceptual open pit with a maximum depth of 400m. The La Pointe inferred resource remains open in all directions with immediate opportunities for expansion to the NE and SW as well as below the shallow portion of the conceptual open pit where drilling is limited to 175m below surface.

 

Fury Gold Mines Limited
Management’s Discussion and Analysis of Financial Condition and

Results of Operations for the Three and Nine months ended September 30, 2026

(Amounts expressed in thousands of Canadian dollars, unless otherwise noted)

7

 

Gold mineralization has been intercepted across widths of up to 75 m and to a depth of up to 500 m. The identified gold mineralization at both La Pointe and La Pointe Extension remains open to depth and along strike.

 

In August 2026, the Company completed a helicopter-borne magnetotelluric (MT) geophysical survey over the Sakami property.

 

The Company expects to incur approximately $30 annually in project maintenance costs, including certain mineral claims payments, in order to keep the properties in good standing in 2026.

 

La Pointe Extension Resource Estimate technical report

 

The La Pointe Extension resource estimation was completed in a technical report authored by Olivier Vadnais-Leblanc, P. Geo., Geologist with SGS Geological Services (“Initial Mineral Resource Estimate for the Sakami Project, Eeyou Istchee Territory, James Bay Region of Quebec, Canada” which is dated January 21, 2026, has an effective date of November 11, 2025, and is filed on www.sedarplus.ca).

 

4.2.4 Elmer East

 

The 100%-owned Elmer East project is in the Eeyou Istchee James Bay Territory of northern Quebec. It covers approximately 45,700 hectares and includes the adjacent Annabelle and Opinaca Gold West claim blocks. The Company acquired the project through its acquisition of Quebec Precious Metals Corporation on April 28, 2025. Access is by the paved Billy Diamond Highway, with helicopter support from the “km 381” rest stop, which provides year-round accommodation, catering, fuel and power.

 

The project lies within the Eastmain volcano-sedimentary belt. The stratigraphy consists of basalts, conglomerates, sandstone-greywacke and paragneiss, intruded by felsic bodies and affected by zones of intense folding and shearing. Metamorphic grade ranges from greenschist to upper amphibolite facies. The property hosts two gold prospects. Lloyd is a gold-bearing structure approximately 4.5 km long that remains open at depth. Georgekish consists of northwest-trending gold-bearing structures along folded volcano-sedimentary units.

 

In May 2026, a Versatile Time-Domain Electromagnetic (VTEM) airbone survey was carried out over the 3 blocs of Elmer East.

 

Ninaaskumuwin lithium discovery

 

The Ninaaskumuwin discovery is approximately 60 km north of km 381 and approximately 50 km north of Rio Tinto’s Galaxy lithium project. It consists of a highly fractionated, spodumene-bearing pegmatite hosted in metasedimentary rocks. Surface samples have returned up to 3.92% Li₂O, and geophysics and mapping suggest the pegmatite may extend up to 3.8 km along strike.

 

The maiden drill program comprised five holes totalling 825 m, and spodumene was observed in three of them (see news releases dated July 9 and July 22, 2025). Highlights included hole EE24-003: 1.16% Li₂O over 32.35 m, including 2.34% Li₂O over 6.0 m and 2.38% Li₂O over 5.0 m, hole EE24-002: 1.19% Li₂O over 22.48 m, including 1.50% Li₂O over 7.2 m and hole EE24-001: 0.79% Li₂O over 22.9 m.

 

On June 23, 2026, the Company announced the results of metallurgical test work on the discovery. The work was carried out by IGS Impact Global Solutions Inc. in Delson, Quebec, on 85 half-HQ drill core samples grading 0.02% to 3.71% Li₂O. A single dense media separation (DMS) step on the coarsest crushed feed produced a potential direct shipping ore concentrate grading 6.02% Li₂O, with 76.7% lithium recovery in 23.0% of the feed mass. Spodumene was the only lithium-bearing mineral identified. The program received financial support from Quebec’s Ministère des Ressources naturelles et des Forêts under its Mineral Exploration Support Program for Critical and Strategic Minerals. The mineralization remains open along strike and at depth.

 

The Company expects to incur approximately $40 in project maintenance costs, including mineral claim payments, to keep the property in good standing in 2026.

 

Fury Gold Mines Limited
Management’s Discussion and Analysis of Financial Condition and

Results of Operations for the Three and Nine months ended September 30, 2026

(Amounts expressed in thousands of Canadian dollars, unless otherwise noted)

8

 

4.3 Nunavut

 

Committee Bay Project

 

The Committee Bay project comprises approximately 224,000 hectares situated along the Committee Bay Greenstone Belt located 180km northeast of the Meadowbank mine operated by Agnico Eagle Mines Limited. The Committee Bay belt comprises one of a number of Archean-aged greenstone belts occurring within the larger Western Churchill province of northeastern Canada. The Committee Bay project is held 100% by the Company, subject to a 1% Net Smelter Return (“NSR”), and an additional 1.5% NSR payable on only 7,596 hectares which may be purchased within two years of the commencement of commercial production for $2,000 for each one-third (0.5%) of the NSR.

 

In 2025, the Company completed six diamond drill holes totaling approximately 2,778 m at the Committee Bay project in the Kitikmeot region of Nunavut (see news release dated November 10, 2025). Four holes (2,041 m) targeting expansion of the Three Bluffs Shear Zone intersected gold mineralization across 315 m of strike. These included 1.18 g/t gold over 19.5 m, including 5.73 g/t gold over 3.0 m, in hole 25TB155, which ended in mineralization. Two holes (737 m) tested the southern contact of the 8 km-long Raven Shear Zone. Hole 25RV015, a 330 m step-out from previous drilling, intersected 4.59 g/t gold over 1.5 m.

 

The Company mobilized to the Committee Bay property at the end of June 2026 and completed an 11 diamond drill hole program of roughly 4,200m as well as collecting till samples, which concluded in mid-September 2026. In late August 2026, a qualified person from SGS Geological Services (“SGS”) completed a site visit to the Committee Bay project. SGS has been engaged to prepare an updated mineral resource estimate for the Three Bluffs deposit. The update will incorporate the results of the 2025 and 2026 drill programs and will be reported in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects. Subsequent to the period end, on November 3, 2026, the Company released assay results for the first five drill holes. Results from the remaining drill holes and the till sampling program are pending.

 

The Company expects to incur approximately $217 in annual mineral claims expenditures in 2026, in order to keep the property in good standing.

 

Committee Bay resource estimate and technical report

 

Three Bluffs resource estimations were completed by APEX Geoscience Ltd. (“APEX”) (see the Technical Report on the Committee Bay Project, Nunavut Territory, Canada, dated September 11, 2023, and filed under Fury’s SEDAR+ profile). It supersedes all previous Committee Bay technical reports.

 

Section 5: Review of quarterly financial information

 

Three months ended: 

Interest

income

  

Net (income)  

loss(1)

  

Comprehensive

(income) loss(1)

  

(Income) loss per

share (C$/share)

 
September 30, 2026  $37   $7,799   $7,797   $0.04 
June 30, 2026   77    14,870    14,868    0.08 
March 31, 2026   125    (15,062)   (15,061)   (0.08)
December 31, 2025   125    (3,227)   (3,214)   (0.02)
September 30, 2025   53    4,699    4,701    0.03 
June 30, 2025   35    1,996    1,998    0.01 
March 31, 2025   44    2,991    2,993    0.02 
December 31, 2024   60    101,256    101,257    0.68 

(1) Certain periods have been restated within this document to correct a misstatement which was identified in the fourth quarter of 2024.

 

Fury Gold Mines Limited
Management’s Discussion and Analysis of Financial Condition and

Results of Operations for the Three and Nine months ended September 30, 2026

(Amounts expressed in thousands of Canadian dollars, unless otherwise noted)

9

 

5.1 Three months ended September 30, 2026, compared to three months ended September 30, 2025

 

During the three months ended September 30, 2026, the Company reported net loss of $7,799 and loss per share of C$0.04 compared to a net loss of $4,699 and loss per share of C$0.03 for the three months ended September 30, 2025. The significant drivers of the change in total net income/loss were as follows:

 

Operating expenses:

 

§Exploration and evaluation costs increased to $10,308 for the three months ended September 30, 2026, compared to $4,295 for the three months ended September 30, 2025. The higher exploration expense in the third quarter of 2026 was a result of the drilling programs as well as environmental baseline studies, metallurgical test work program, and pre-feasibility study work at Eau Claire as well as the drilling program at Committee Bay. The exploration expense in the third quarter of 2025 was a result of the summer drilling programs at Sakami and Committee Bay.

 

§Fees, salaries and other employee benefits increased to $641 for the three months ended September 30, 2026, which includes $236 of share-based compensation compared to $485 for the three months ended September 30, 2025 which only included $144 of share-based compensation for the period. The increase in fees are partially due to a higher headcount than 2025 as well as the increase in the share-based compensation from last year are due to the vesting of the RSU’s in a higher percentage compared to the prior year; and

 

§Legal and professional fees decreased to $150 for the three months ended September 30, 2026, compared to $310 for the three months ended September 30, 2025. The higher costs in 2025 were primarily due to professional fees associated with the review of the corporate acquisitions and internal control over financial reporting services during the quarter compared to the current year.

 

Other (income) expenses, net:

 

§Net loss from associates of $4 for the three months ended September 30, 2026 compared $1,847 in the previous year comparable period, was a result of the exchange of the Company’s shares in Dolly Varden where it had significant influence due to an investor rights agreement, to those of Contango, a company in which it does not have an agreement or significant influence and therefore the investments ceased to be an investment in associate.

 

§Net gain on investments in associates of $nil for the three months ended September 30, 2026, whereas in the previous year comparable period, there was a gain on investments of $1,854 as a result of the Company’s disposition of Dolly Varden shares during that period and a deemed gain on dilution; and

 

§Net gain on marketable securities of $3,367 for the three months ended September 30, 2026 compared to net gain of $320 for the three months ended September 30, 2025 was primarily a result of a significant increase in marketable securities prices in the quarter compared to the same comparable quarter.

 

5.2 Nine months ended September 30, 2026, compared to nine months ended September 30, 2025

 

During the nine months ended September 30, 2026, the Company reported net loss of $7,607 and loss per share of C$0.04 compared to a net loss of $9,687 and loss per share of $0.06 for the nine months ended September 30, 2025. The significant drivers of the change in total net loss were as follows:

 

Operating expenses:

 

§Exploration and evaluation costs increased to $22,200 for the nine months ended September 30, 2026 compared to $9,489 for the nine months ended September 30, 2025. The exploration expense in 2026 was a result of the ongoing drilling programs and developmental studies at Eau Claire, the mobilization at Committee Bay that ended in September, and the test results from the Elmer East project, whereas in 2025, there were the diamond drilling program at the Éléonore South property in the first quarter, the program at Sakami which started in June, and the program in Committee Bay that started in July;

 

Fury Gold Mines Limited
Management’s Discussion and Analysis of Financial Condition and

Results of Operations for the Three and Nine months ended September 30, 2026

(Amounts expressed in thousands of Canadian dollars, unless otherwise noted)

10

 

§Legal and professional fees decreased to $555 for the nine months ended September 30, 2026 compared to $896 for the nine months ended September 30, 2025. The higher costs in the previous year were primarily a result of due diligence work performed for various financings, as well as fees related to the valuation of mineral property interests; and

 

§Fees, salaries and other employee benefits increased to $2,195 for the nine months ended September 30, 2026 compared to $1,547 for the nine months ended September 30, 2025. The increase in costs is driven largely by an increase in share-based compensation of $593 compared to 2025 as well as increased headcount.

 

Other income, net:

§Net gain on investment in associates of $19,241 for the nine months ended September 30, 2026, compared to a net gain on disposal of investment of $3,230 and deemed dilution gain of $2,002 for the nine months ended September 30, 2025;

 

§Net loss from associates of $935 for the nine months ended September 30, 2026 comprising the Company’s share of net losses of Dolly Varden and UMS compared to $3,634 for the nine months ended September 30, 2025;

 

§Amortization of flow-through share premium decreased to $756 for the nine months ended September 30, 2026 compared to $1,142 for the nine months ended September 30, 2025 was a direct result of the significantly lower premiums for the 2025 financings as compared to the 2024 financings despite more robust drilling programs; and

 

§Net loss on marketable securities of $650 for the nine months ended September 30, 2026 compared to a net gain of $668 for the nine months ended September 30, 2025 was a result of a mark-to-market losses due to decrease in the prices of securities held for resale in the third quarter of 2026.

 

Section 6: Financial position, liquidity, and capital resources

 

   At September 30
2026
   At December 31
2025
 
Cash  $5,784   $21,197 
Restricted cash   173    144 
Marketable securities   43,662    7,783 
Other investment (1)   2,128    2,031 
Other assets   2,300    1,283 
Mineral property interests   49,603    49,918 
Investments in associates   95    25,963 
Current liabilities   4,925    2,835 
Non-current liabilities   4,265    4,473 
Working capital surplus (2)   48,611    29,162 
Accumulated deficit   271,258    263,651 

(1) Investment in unlisted shares of Alsym Energy Inc.

(2) Working capital is a non-GAAP term defined for these purposes as total current assets less total current liabilities

 

  

Three months ended

September 30

   Nine months ended
September 30
 
Cash flows from continuing operations:  2026   2025   2026   2025 
Cash used in operating activities  $(8,478)  $(5,503)  $(23,139)  $(12,567)
Cash provided by investing activities   5,583    3,024    7,759    6,390 
Cash (used in) provided by financing activities   (29)   41    (29)   7,398 

 

Fury Gold Mines Limited
Management’s Discussion and Analysis of Financial Condition and

Results of Operations for the Three and Nine months ended September 30, 2026

(Amounts expressed in thousands of Canadian dollars, unless otherwise noted)

11

 

6.1 Cash flows

 

Operating activities:

 

§During the three months ended September 30, 2026, the Company used cash of $8,478 in operating activities compared to $5,503 in 2025. The higher cash outflow for the current period was consistent with higher exploration activities compared to the previous year.

 

§During the nine months ended September 30, 2026, the Company used cash of $23,139 in operating activities compared to $12,567 during the nine months ended September 30, 2025. The higher cash outflow was consistent with the additional work performed at Eau Claire compared to the previous year.

 

Investing activities:

 

§During the three months ended September 30, 2026, the Company generated cash from investing activities of $5,583, primarily representing net receipts from disposal of marketable securities. During the three months ended September 30, 2025, the Company generated cash from investing activities of $3,024, representing mostly proceeds from disposition of investment and marketable securities.

 

§During the nine months ended September 30, 2026, the Company generated cash from investing activities of $7,759, primarily representing net receipts of $7,645 from disposal of marketable securities and interest income of $239. During the nine months ended September 30, 2025, the Company generated cash from investing activities of $6,390, representing net receipt of $6,539 from selling Dolly Varden shares and net receipts of $670 for selling marketable securities, offset by mineral property interest additions of $904 and equipment addition of $47.

 

Financing activities:

 

§For the three months ended September 30, 2026, cash used in financing activities was $29 from restricted cash. For the three months ended September 30, 2025, cash provided by financing activities of $41 was from the proceeds from exercise of share options.

 

§For the nine months ended September 30, 2025, cash used in financing activities of $29 represented the increase in restricted cash. For the nine months ended September 30, 2025, cash provided by financing activities of $7,398 represented the net proceeds received from a private placement that raised net $4,477 and a flow-through financing which raised net $2,857.

 

6.2 Contractual commitments

 

In the normal course of business, the Company enters into contracts that give rise to commitments for future minimum payments. The following table summarizes the remaining contractual maturities of the Company’s financial liabilities and commitments as at September 30, 2026, shown in contractual undiscounted cashflows:

 

  

Within

1 year

   2 to 3
years
   Over 3
years
   At
September 30
2026
   At
December 31
2025
 
Accounts payable and accrued liabilities  $4,891   $—     $—     $4,891   $2,023 
Deferred government grant   —      —      —      —      22 
Flow-through share premium liability(1)   34    —      —      34    790 
Total  $4,925   $—     $—     $4,925   $2,835 

(1) The remaining exploration expenditure the Company is committed to incur before December 31, 2026, is $725.

 

Fury Gold Mines Limited
Management’s Discussion and Analysis of Financial Condition and

Results of Operations for the Three and Nine months ended September 30, 2026

(Amounts expressed in thousands of Canadian dollars, unless otherwise noted)

12

 

The Company also makes certain payments arising on mineral claims and leases on an annual or bi-annual basis to ensure all the Company’s properties remain in good standing. The Company estimates that $575 of payments arising on mineral claims and leases will be payable during the year ended December 31, 2026.

 

In addition, the Company is committed to certain office rental expense in respect of formerly shared head office premises as noted in section 8.

 

6.3 Summary of mineral property interests

 

A summary of the carrying amounts of the Company’s mineral property interests is as follows:

 

   Quebec   Nunavut   Total 
Balance at December 31, 2024  $37,100   $8,100   $45,200 
Additions   5,436    —      5,436 
Change in estimate of provision for site reclamation and closure   (597)   (121)   (718)
Balance at December 31, 2025  $41,939   $7,979   $49,918 
Change in estimate of provision for site reclamation and closure   (275)   (40)   (315)
Balance at September 30, 2026  $41,664   $7,939   $49,603 

 

On April 28, 2025, the Company acquired all of the issued and outstanding common shares of Quebec Precious Metals Corporation. The QPM Acquisition was accounted for as an asset acquisition, with its mineral property interests valued at $5,436.

 

During October 2025, the Company received the first milestone payment from Benz to acquire the remaining 25% interest (for a total 100% undivided interest) of the Eastmain Mine and Ruby Hill Properties. The payment of $1,100 consisted of $850 cash and Benz Common Shares with a market value at the time of $250.

 

6.4 Capital resources

 

The Company seeks to proactively manage its capital resources and makes adjustments in light of changes in the economic environment and the risk characteristics of the Company’s assets. To effectively manage its capital requirements, the Company has in place a budgeting and cash management process to help determine the funds required to ensure the Company has the appropriate liquidity to meet its current project plans and achieve its growth objectives. The Company ensures that there is sufficient liquidity available to meet its short-term business requirements, including contractual commitments, taking into account its anticipated cash outflows from exploration activities and its holdings of cash and marketable securities. The Company monitors and adjusts, when required, these exploration programs as well as corporate administrative costs to ensure that adequate levels of working capital are maintained.

 

As at the date of this MD&A, the Company expects its existing working capital and other capital resources to support certain planned activities for more than the next 12 months at the Eau Claire and Committee Bay projects and to meet all its short-term contractual commitments. The Company’s ability to undertake further project expansionary plans may become dependent upon the Company’s ability to obtain adequate financing in the future. While the Company has been successful at raising capital in the past, there can be no assurance that the Company will have sufficient financing to meet its future capital requirements or that additional financing will be available on terms acceptable to the Company in the future.

 

October 2025 financing

 

In October 2025, the Company issued a total of 15,918,000 flow-through shares for total gross proceeds of $18,000. Share issue costs related to the October 2025 Offering totaled $1,396, which included $1,198 in commissions and $198 in other issuance costs.

 

Fury Gold Mines Limited
Management’s Discussion and Analysis of Financial Condition and

Results of Operations for the Three and Nine months ended September 30, 2026

(Amounts expressed in thousands of Canadian dollars, unless otherwise noted)

13

 

Reconciliation of use of fund of October 2025 funding

 

Fury’s stated use of proceeds for the October 2025 Offering was to pursue exploration opportunities at both its Quebec and Nunavut projects. The funds raised and the application of these funds and working capital is summarized below.

 

   Q4 2025   Q1 2026   Q2 2026   Q3 2026 
Exploration and evaluation   (1,180)   (3,859)   (3,402)   (7,438)
Amount raised   16,604    —      —      —   
Remaining to be spent on Quebec and Nunavut projects   15,424    11,565    8,163    725 

 

Exercise of share options and warrants

 

During the nine months ended September 30, 2026, there were no issued share options or warrants that were exercised.

 

As at September 30, 2026, the share options outstanding were as follows:

 

   Share options outstanding   Share options exercisable 
Exercise price
($/option)
  Number of shares   Weighted average exercise price (C$/option)   Weighted average remaining life (years)   Number of shares   Weighted average exercise price (C$/option)   Weighted average remaining life (years) 
C$0.53 – C$0.99   3,324,500    0.80    2.21    2,855,750    0.79    1.83 
C$1.00 – C$1.85   2,361,659    1.01    0.48    2,361,659    1.01    0.48 
C$2.05 – C$3.91   11,115    2.29    0.45    11,115    2.29    0.45 
    5,697,274    0.89    1.49    5,228,524    0.90    1.21 

 

The number of share purchase warrants outstanding at September 30, 2026 was as follows:

 

   Warrants
outstanding
   Weighted average exercise price
(C$/share)
 
Outstanding, December 31, 2024   —      —   
Issued   13,029,435    1.00 
Outstanding, December 31, 2025 and September 30, 2026   13,029,435   $1.00 

 

 

On January 9, 2026, the Company issued 430,000 DSU’s to directors and 885,000 RSU’s to officers and employees. The DSU’s and RSU’s were issued in accordance with the Company’s LTI plan, with a grant-date fair value of C$0.81 per unit, one third vesting annually on anniversary with the first trench vested immediately.

 

On January 9, 2025, the Company issued 590,000 DSU’s to directors and 1,142,500 RSU’s to officers, and employees. The DSU’s and RSU’s were issued in accordance with the Company’s LTI plan, with a grant-date fair value of C$0.55 per unit, one third vesting annually on the anniversary and to be paid out as fully paid shares.

 

The Company does not utilize off-balance sheet arrangements. Earn-in arrangements are not viewed as off-balance sheet arrangements, and there are no other commitments held by the Company at the balance sheet date.

 

As at November 13, 2026, there were 5,697,274 and 13,029,435 share options and warrants outstanding, respectively, with a weighted average exercise price of C$0.90 and C$1.00, respectively.

 

6.5 Capital structure

 

Authorized: Unlimited common shares without par value. Unlimited preferred shares – nil issued and outstanding.

 

Fury Gold Mines Limited
Management’s Discussion and Analysis of Financial Condition and

Results of Operations for the Three and Nine months ended September 30, 2026

(Amounts expressed in thousands of Canadian dollars, unless otherwise noted)

14

 

Number of common shares issued and outstanding as at September 30, 2026: 190,132,195

 

Number of common shares issued and outstanding as at November 13, 2026: 190,132,195

 

6.6 Planned Exploration Activities

 

The Company is funded for its 2026 exploration programs, which include infill drilling at Eau Claire as well as a completed summer drill program at Committee Bay.

 

As at September 30, 2026, the Company had positive working capital of approximately $48,611, which the Company defines as total current assets (including marketable securities valued at prevailing market prices) less total current liabilities including a cash balance of $5,784 (which excludes $173 restricted cash). As of the date of this MD&A, the Company's working capital is estimated to have declined by approximately $3,000 since September 30, 2026, to pay for general corporate and exploration costs.

 

Section 7: Financial risk summary

 

As at September 30, 2026, the Company’s financial instruments consist of cash, marketable securities, other investments, accounts receivable, deposits, accounts payable and accrued liabilities, and deferred government grants. The fair values of these financial instruments, other than the marketable securities and other investments, approximate their carrying values due to their short term to maturity. The Company’s marketable securities, representing investments held in publicly traded entities, were classified as level 1 of the fair value hierarchy and measured at fair value using their quoted market price at period end. The Company’s other investments, representing investments held in private entities, were classified as level 3 of the fair value hierarchy and measured at fair value based on unobservable inputs.

 

The Company’s financial instruments are exposed to certain financial risks, primarily liquidity risk, credit risk and market risk, including price risk. Details of the primary financial risks that the Company is exposed to are available in the notes to the Company’s condensed interim consolidated financial statements for the three and nine months ended September 30, 2026.

 

Section 8: Related party transactions and balances

 

8.1 UMS

 

In the previous three years, the Company has not conducted nor proposed any related party transactions (defined generally as material transactions involving insiders) as contemplated by securities policies dealing with protection of minority shareholders. The Company’s shared services provider arrangements are considered related party transactions for financial disclosure purposes because the Company is a part owner of the service provider company. The Company owns 25% of the common shares of Universal Mineral Services Ltd (“UMS “) a shared services provider, with the other 75% owned by three other mineral exploration companies. UMS is a private company through which its four junior resource shareholders, including Fury Gold, share geological, financial, and transactional advisory services as well as administrative services on a full, cost recovery basis. This allows the Company to maintain a more efficient and cost-effective corporate overhead structure by hiring fewer full-time employees and engaging outside professional advisory firms less frequently. The agreement has an indefinite term and can be terminated for any participant upon providing 180 days’ notice.

 

All transactions with UMS have occurred in the normal course of operations, and all amounts owing to or from UMS are unsecured, non-interest bearing, and have no specific terms of settlement, unless otherwise noted.

 

   Three months ended
September 30
   Nine months ended
September 30
 
   2026   2025   2026   2025 
Exploration and evaluation costs  $291   $187   $455   $260 
General and administration   52    48    174    180 
Total transactions for the period  $343   $235   $629   $440 

 

Fury Gold Mines Limited
Management’s Discussion and Analysis of Financial Condition and

Results of Operations for the Three and Nine months ended September 30, 2026

(Amounts expressed in thousands of Canadian dollars, unless otherwise noted)

15

 

The outstanding balance owing at September 30, 2026 was $54 (December 31, 2025 – $57) which is included in accounts payable and accrued liabilities.

 

As part of the UMS arrangement, the Company is contractually obliged to contingently pay certain rental expenses in respect of a ten-year office lease entered into by UMS on July 1, 2021, which premises are currently substantially sub-leased. As at September 30, 2026, the Company expects to incur approximately $69 in respect of its share of future rental expense of UMS.

 

The Company issues share options to certain UMS employees, including key management personnel of the Company. The Company recognized a share-based compensation expense of $4 and $20 for the three and nine months ended September 30, 2026, in respect of share options issued to UMS employees (September 30, 2025 - $2 and $9) which is included within employee benefits and exploration and evaluation costs.

 

8.2 Key management personnel

 

Remuneration of Fury Gold’s board of directors and certain executive officers of the Company, including the Chief Executive Officer and Chief Financial Officer was as follows:

 

   Three months ended
September 30
   Nine months ended
September 30
 
   2026   2025   2026   2025 
Short-term benefits provided to executives (a)   $335   $260   $970   $787 
Directors’ fees paid to non-executive directors   73    60    216    191 
Share-based payments   186    151    834    443 
Total  $594   $471   $2,020   $1,421 

(a) Short-term employee benefits include salaries, bonus, and other employee benefits.

 

Section 9: Critical accounting estimates and judgments

 

The preparation of financial statements in conformity with IFRS Accounting Standards as issued by the IASB requires management to select accounting policies and make estimates and judgments that may have a significant impact on the consolidated financial statements. Estimates are continuously evaluated and are based on management’s experience and expectations of future events that are believed to be reasonable under the circumstances. Actual outcomes may differ from these estimates.

 

In preparing the Company’s condensed interim consolidated financial statements for the three and nine months ended September 30, 2026, the Company applied the material accounting policy information and critical accounting estimates and judgements disclosed in notes 3 and 5 of its consolidated financial statements for the year ended December 31, 2025.

 

Adoption of new and revised accounting standards

 

Effective January 1, 2026, the Company adopted amendments to IFRS 9, Financial Instruments, and IFRS 7, Financial Instruments: Disclosures, providing clarifications for, among other things, the date of recognition and derecognition of financial assets and liabilities, and updating the disclosures for equity instruments designated at fair value through other comprehensive income. These amendments did not have a material impact on the Company's condensed interim consolidated financial statements.

 

We have applied the exception to the requirement to derecognize a financial liability on the settlement date. This exception permits the Company to deem a financial liability (or a part of a financial liability), that will be settled with cash using an electronic payment system, to be discharged before the settlement date if, and only if, we have initiated the payment instruction and:

 

§We have no practical ability to withdraw, stop or cancel the payment instruction;

 

§We have no practical ability to access the cash to be used for settlement as a result of the payment instruction; and

 

Fury Gold Mines Limited
Management’s Discussion and Analysis of Financial Condition and

Results of Operations for the Three and Nine months ended September 30, 2026

(Amounts expressed in thousands of Canadian dollars, unless otherwise noted)

16

 

§The settlement risk associated with the electronic payment system is insignificant.

 

New and amended standards not yet effective

 

Certain pronouncements have been issued by the IASB that are mandatory for accounting periods beginning after December 31, 2025. The Company has not early adopted any of these pronouncements, and the impact of some on the financial statements are still being evaluated.

 

On April 9, 2024, the IASB issued a new standard, called IFRS 18 Presentation and Disclosure in Financial Statements, which applies to an annual reporting period beginning on or after January 1, 2027, with earlier application permitted. IFRS 18 includes requirements for all entities applying IFRS Accounting Standards as issued by the IASB for the presentation and disclosure of information in financial statements. The Company is currently evaluating the impact of the new standard on its financial statements.

 

Section 10: Controls and procedures

 

Disclosure controls and procedures

 

Disclosure controls and procedures (“DC&P”) are designed to provide reasonable assurance that information required to be disclosed in reports filed with, or submitted to, securities regulatory authorities is recorded, processed, summarized and reported within the time periods specified under Canadian and U.S. securities laws. As at September 30, 2026, an evaluation was carried out under the supervision of, and with the participation of, the Company's management, including the CEO and CFO, of the effectiveness of the Company's DC&P, as defined in the applicable Canadian and U.S. securities laws. Based on that evaluation, the CEO and CFO concluded that such DC&P are effective as of September 30, 2026. No changes have occurred in the Company’s DC&P during the three months ended September 30, 2026, that have materially affected, or are reasonably likely to materially affect, the Company’s disclosure controls and procedures.

 

Internal control over financial reporting

 

Internal control over financial reporting (“ICFR”) includes those policies and procedures that:

 

§pertain to the maintenance of records that in reasonable detail accurately and fairly reflect the transactions and dispositions of the assets of the Company; and

 

§provide reasonable assurance that transactions are recorded as necessary to permit preparation of consolidated financial statements in accordance with IFRS Accounting Standards as issued by the IASB, and that receipts and expenditures of the Company are being made only in accordance with authorizations of management and directors of the Company; and

 

§provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the Company assets, or incurring liabilities or other obligations that could have a material effect on the consolidated financial statements.

 

It is management’s responsibility to establish and maintain adequate ICFR to provide reasonable assurance regarding the reliability of financial reporting and the preparation of consolidated financial statements for external purposes in accordance with IFRS Accounting Standards as issued by the IASB.

 

The Company's management, including the Company’s CEO and CFO, assessed the effectiveness of the Corporation's ICFR as at September 30, 2026, based on the criteria set forth in Internal Control - Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on this assessment, management concluded that, as at September 30, 2026, the Company's ICFR was effective. No changes have occurred in the Company’s ICFR during the three months ended September 30, 2026 that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting.

 

Additional disclosures pertaining to the Company’s management information circulars, material change reports, press releases, and other information are available on SEDAR+ at www.sedarplus.com.

 

On behalf of the Board of Directors,

 

“Forrester A. Clark”

 

Forrester A. Clark

 

Chief Executive Officer

 

November 13, 2026

 

 

Fury Gold Mines Limited
Management’s Discussion and Analysis of Financial Condition and

Results of Operations for the Three and Nine months ended September 30, 2026

(Amounts expressed in thousands of Canadian dollars, unless otherwise noted)

17

 

Exhibit 99.3

 

Form 52-109F2

Certification of Interim Filings

Full Certificate

 

I, Forrester A. Clark, Chief Executive Officer of Fury Gold Mines Limited., certify the following:

 

1.Review: I have reviewed the interim financial report and interim MD&A (together, the “interim filings”) of Fury Gold Mines Limited (the “issuer”) for the interim period ended September 30, 2026.

 

2.No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.

 

3.Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings.

 

4.Responsibility: The issuer’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as those terms are defined in National Instrument 52-109 Certification of Disclosure in Issuers’ Annual and Interim Filings, for the issuer.

 

5.Design: Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer’s other certifying officer(s) and I have, as at the end of the period covered by the interim filings

 

(a)designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that

 

(i)material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings are being prepared; and

 

(ii)information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and

 

(b)designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer’s GAAP.

 

5.1Control framework: The control framework the issuer’s other certifying officer(s) and I used to design the issuer’s ICFR is based on Internal Control – Integrated Framework (2013) published by the Committee of Sponsoring Organizations of the Treadway Commission.

 

5.2ICFR – material weakness relating to design: NA

 

 1

 

 

5.3Limitation on scope of design: NA

 

6.Reporting changes in ICFR: The issuer has disclosed in its interim MD&A any change in the issuer’s ICFR that occurred during the period beginning on July 1, 2026 and ended on September 30, 2026 that has materially affected, or is reasonably likely to materially affect, the issuer’s ICFR.

 

Date: November 13, 2026

 

Signed “Forrester A. Clark”

_______________________

Forrester A. Clark

Chief Executive Officer

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

Exhibit 99.4

 

Form 52-109F2

Certification of Interim Filings

Full Certificate

 

I, Phil van Staden, Chief Financial Officer of Fury Gold Mines Limited, certify the following:

 

1.Review: I have reviewed the interim financial report and interim MD&A (together, the “interim filings”) of Fury Gold Mines Limited (the “issuer”) for the interim period ended September 30, 2026.

 

2.No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.

 

3.Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings.

 

4.Responsibility: The issuer’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as those terms are defined in National Instrument 52-109 Certification of Disclosure in Issuers’ Annual and Interim Filings, for the issuer.

 

5.Design: Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer’s other certifying officer(s) and I have, as at the end of the period covered by the interim filings

 

(a)designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that

 

(i)material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings are being prepared; and

 

(ii)information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and

 

(b)designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer’s GAAP.

 

5.1Control framework: The control framework the issuer’s other certifying officer(s) and I used to design the issuer’s ICFR is based on Internal Control – Integrated Framework (2013) published by the Committee of Sponsoring Organizations of the Treadway Commission.

 

5.2ICFR – material weakness relating to design: NA

 

 1

 

 

5.3Limitation on scope of design: NA

 

6.Reporting changes in ICFR: The issuer has disclosed in its interim MD&A any change in the issuer’s ICFR that occurred during the period beginning on July 1, 2026 and ended on September 30, 2026 that has materially affected, or is reasonably likely to materially affect, the issuer’s ICFR.

 

Date: November 13, 2026

 

Signed “Phil van Staden”

_______________________

Phil van Staden

Chief Financial Officer

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

Filing Exhibits & Attachments

4 documents

Keep reading