Ramaco Resources (Nasdaq: METC) filed an 8-K disclosing unaudited Q2-25 data and several strategic updates.
Pre-earnings snapshot: sales of ≈1.0 MM tons are expected to generate $152-$154 MM of revenue, fractionally below $155.3 MM YoY and modestly weaker than Q1-25. Liquidity at 6/30/25 was $88 MM (cash $28 MM; revolver availability $60 MM). H1-25 capex fell to $35-36 MM from $40 MM YoY. Contract backlog totals 3.4 MM tons: 1.4 MM tons fixed at $139/t and 2.0 MM tons index-linked, two-thirds deliverable in 2025.
Operational & market context: Q2 production matched shipments at 1.0 MM tons (up from 0.9 MM YoY); the Eagle mine was temporarily idled amid softer global met-coal pricing (Aus. benchmark mid-July: $176/t vs Q1 avg $185/t). The Board suspended the Class A dividend after three quarters of scrip payments.
Strategic actions:
- Secured a $6.1 MM Wyoming Energy Authority grant to advance the Brook Mine REE pilot plant; Notice-to-Proceed received 17-Jun-25.
- Negotiating a third amendment to its KeyBank credit facility to permit issuance of up to $100 MM senior notes due 2030 and reduce additional unsecured debt capacity to $15 MM.
The filing contains cautionary forward-looking language; figures remain subject to final closing.
Ramaco Resources (Nasdaq: METC) ha depositato un modulo 8-K divulgando dati non revisionati del secondo trimestre 2025 e diversi aggiornamenti strategici.
Riepilogo pre-risultati: si prevede che vendite di circa 1,0 milioni di tonnellate genereranno un fatturato di 152-154 milioni di dollari, leggermente inferiore ai 155,3 milioni di dollari dell'anno precedente e modestamente più debole rispetto al primo trimestre 2025. La liquidità al 30/06/25 era di 88 milioni di dollari (28 milioni in contanti; 60 milioni di disponibilità sul revolver). Gli investimenti nel primo semestre 2025 sono scesi a 35-36 milioni di dollari rispetto ai 40 milioni dell’anno precedente. L’arretrato contrattuale ammonta a 3,4 milioni di tonnellate: 1,4 milioni a prezzo fisso di 139 dollari/tonnellata e 2,0 milioni indicizzati, con due terzi consegnabili nel 2025.
Contesto operativo e di mercato: la produzione del secondo trimestre ha eguagliato le spedizioni a 1,0 milioni di tonnellate (in aumento da 0,9 milioni anno su anno); la miniera Eagle è stata temporaneamente fermata a causa del calo dei prezzi globali del carbone metallurgico (benchmark australiano a metà luglio: 176 dollari/tonnellata contro la media del primo trimestre di 185 dollari/tonnellata). Il Consiglio di Amministrazione ha sospeso il dividendo di Classe A dopo tre trimestri di pagamenti in azioni.
Azioni strategiche:
- Ottenuto un contributo di 6,1 milioni di dollari dalla Wyoming Energy Authority per avanzare il progetto pilota dell’impianto REE della miniera Brook; il Notice-to-Proceed è stato ricevuto il 17 giugno 2025.
- In corso di negoziazione una terza modifica alla linea di credito con KeyBank per consentire l’emissione di fino a 100 milioni di dollari in obbligazioni senior con scadenza 2030 e ridurre la capacità di debito non garantito aggiuntivo a 15 milioni di dollari.
Il documento contiene avvertenze sulle proiezioni future; i dati sono soggetti a conferma definitiva.
Ramaco Resources (Nasdaq: METC) presentó un formulario 8-K revelando datos no auditados del segundo trimestre de 2025 y varias actualizaciones estratégicas.
Resumen previo a resultados: se esperan ventas de aproximadamente 1.0 millones de toneladas que generarán ingresos de $152-$154 millones, ligeramente por debajo de $155.3 millones interanuales y modestamente inferior al primer trimestre de 2025. La liquidez al 30/06/25 fue de $88 millones (efectivo $28 millones; disponibilidad revolvente $60 millones). La inversión en el primer semestre de 2025 cayó a $35-36 millones desde $40 millones interanuales. El backlog de contratos totaliza 3.4 millones de toneladas: 1.4 millones a precio fijo de $139/tonelada y 2.0 millones indexados, con dos tercios entregables en 2025.
Contexto operativo y de mercado: la producción del segundo trimestre igualó los envíos en 1.0 millón de toneladas (subiendo desde 0.9 millones interanuales); la mina Eagle fue temporalmente detenida debido a la caída de los precios globales del carbón metalúrgico (referencia australiana a mediados de julio: $176/tonelada vs promedio del primer trimestre de $185/tonelada). La Junta suspendió el dividendo Clase A tras tres trimestres de pagos en acciones.
Acciones estratégicas:
- Se aseguró una subvención de $6.1 millones de la Wyoming Energy Authority para avanzar en la planta piloto de elementos de tierras raras (REE) de la mina Brook; el aviso para proceder se recibió el 17 de junio de 2025.
- Se negocia una tercera enmienda a la línea de crédito con KeyBank para permitir la emisión de hasta $100 millones en bonos senior con vencimiento en 2030 y reducir la capacidad adicional de deuda no garantizada a $15 millones.
El documento contiene advertencias sobre proyecciones futuras; las cifras están sujetas a cierre final.
Ramaco Resources (나스닥: METC)는 2025년 2분기 미감사 데이터를 포함한 8-K 보고서와 여러 전략적 업데이트를 제출했습니다.
실적 발표 전 요약: 약 100만 톤의 판매가 1억 5200만~1억 5400만 달러의 매출을 창출할 것으로 예상되며, 이는 전년 동기 1억 5530만 달러보다 약간 낮고 2025년 1분기보다 다소 약한 수준입니다. 2025년 6월 30일 기준 유동성은 8800만 달러(현금 2800만 달러, 리볼버 가능액 6000만 달러)였습니다. 2025년 상반기 자본 지출은 전년 4000만 달러에서 3500만~3600만 달러로 감소했습니다. 계약 잔액은 총 340만 톤으로, 140만 톤은 톤당 139달러 고정, 200만 톤은 지수 연동형이며 이 중 3분의 2는 2025년에 인도 예정입니다.
운영 및 시장 상황: 2분기 생산량은 100만 톤으로 출하량과 일치했으며(전년 90만 톤 대비 증가), Eagle 광산은 글로벌 금속탄소 가격 약세로 일시 가동 중단되었습니다(7월 중순 호주 벤치마크: 톤당 176달러, 1분기 평균 185달러 대비). 이사회는 3분기 연속 주식배당 후 Class A 배당금을 중단했습니다.
전략적 조치:
- 와이오밍 에너지 당국으로부터 610만 달러 보조금을 확보해 Brook 광산 희토류 원소(REE) 파일럿 플랜트 개발을 진행 중이며, 2025년 6월 17일 착수 통보를 받았습니다.
- KeyBank 신용 시설에 대한 세 번째 수정안을 협상 중이며, 2030년 만기 1억 달러까지의 선순위 채권 발행을 허용하고 추가 무담보 부채 한도를 1500만 달러로 줄이는 방안을 추진하고 있습니다.
보고서에는 미래 예측에 관한 주의 문구가 포함되어 있으며, 수치는 최종 마감 시 변경될 수 있습니다.
Ramaco Resources (Nasdaq : METC) a déposé un formulaire 8-K divulguant des données non auditées du deuxième trimestre 2025 ainsi que plusieurs mises à jour stratégiques.
Résumé avant résultats : des ventes d’environ 1,0 million de tonnes devraient générer un chiffre d’affaires de 152-154 millions de dollars, légèrement inférieur aux 155,3 millions de dollars de l’année précédente et modestement plus faible que le premier trimestre 2025. La liquidité au 30/06/25 s’élevait à 88 millions de dollars (28 millions en cash ; 60 millions de disponibilité sur la ligne de crédit renouvelable). Les dépenses d’investissement du premier semestre 2025 ont diminué à 35-36 millions de dollars contre 40 millions l’an dernier. Le carnet de commandes totalise 3,4 millions de tonnes : 1,4 million à prix fixe de 139 $/t et 2,0 millions indexées, dont deux tiers livrables en 2025.
Contexte opérationnel et marché : la production du deuxième trimestre a égalé les expéditions à 1,0 million de tonnes (en hausse par rapport à 0,9 million l’an passé) ; la mine Eagle a été temporairement mise à l’arrêt en raison de la baisse des prix mondiaux du charbon métallurgique (référence australienne mi-juillet : 176 $/t contre une moyenne de 185 $/t au premier trimestre). Le conseil d’administration a suspendu le dividende de Classe A après trois trimestres de paiements en actions.
Actions stratégiques :
- Obtention d’une subvention de 6,1 millions de dollars de la Wyoming Energy Authority pour faire avancer la centrale pilote REE de la mine Brook ; le « Notice-to-Proceed » a été reçu le 17 juin 2025.
- Négociation d’une troisième modification de la facilité de crédit KeyBank pour permettre l’émission de 100 millions de dollars d’obligations senior arrivant à échéance en 2030 et réduire la capacité de dette non garantie supplémentaire à 15 millions de dollars.
Le dépôt contient des avertissements prospectifs ; les chiffres restent soumis à la clôture finale.
Ramaco Resources (Nasdaq: METC) hat eine 8-K Meldung eingereicht, in der ungeprüfte Daten für das zweite Quartal 2025 und mehrere strategische Updates veröffentlicht wurden.
Vorläufige Ergebnisübersicht: Der Verkauf von ca. 1,0 Mio. Tonnen soll einen Umsatz von 152-154 Mio. USD generieren, was geringfügig unter den 155,3 Mio. USD des Vorjahres liegt und leicht schwächer als im ersten Quartal 2025 ist. Die Liquidität zum 30.06.25 betrug 88 Mio. USD (Barmittel 28 Mio. USD; revolvierende Kreditlinie 60 Mio. USD). Die Investitionsausgaben im ersten Halbjahr 2025 sanken auf 35-36 Mio. USD von 40 Mio. USD im Vorjahr. Der Auftragsbestand beläuft sich auf 3,4 Mio. Tonnen: 1,4 Mio. Tonnen zu einem Festpreis von 139 USD/t und 2,0 Mio. Tonnen indexgebunden, wovon zwei Drittel im Jahr 2025 geliefert werden.
Betrieblicher und Markt-Kontext: Die Produktion im zweiten Quartal entsprach den Lieferungen mit 1,0 Mio. Tonnen (Steigerung von 0,9 Mio. im Vorjahr); die Eagle-Mine wurde vorübergehend stillgelegt aufgrund schwächerer globaler Metallkohlenstoffpreise (australischer Benchmark Mitte Juli: 176 USD/t vs. Q1-Durchschnitt 185 USD/t). Der Vorstand hat nach drei Quartalen mit Aktiendividenden die Dividende der Klasse A ausgesetzt.
Strategische Maßnahmen:
- Erhielt einen 6,1 Mio. USD Zuschuss der Wyoming Energy Authority zur Weiterentwicklung der Brook-Mine REE-Pilotanlage; Notice-to-Proceed am 17. Juni 2025 erhalten.
- Verhandelt eine dritte Änderung der Kreditfazilität mit KeyBank, um die Ausgabe von bis zu 100 Mio. USD Senior Notes mit Fälligkeit 2030 zu ermöglichen und die zusätzliche unbesicherte Kreditkapazität auf 15 Mio. USD zu reduzieren.
Die Meldung enthält vorsorgliche zukunftsgerichtete Aussagen; Zahlen sind noch vor endgültigem Abschluss vorbehaltlich.
- $6.1 MM Wyoming grant funds Brook Mine REE pilot, advancing strategic diversification.
- Liquidity of $88 MM plus planned $100 MM note offering signals solid capital-market access.
- Production up to 1.0 MM tons vs 0.9 MM YoY amid challenging pricing.
- Capex down to $35-36 MM in H1-25, supporting free cash flow.
- Q2-25 revenue guidance ($152-$154 MM) slightly below prior-year $155.3 MM and weaker than Q1.
- Board suspended Class A dividend, indicating cash preservation.
- Eagle mine temporarily idled due to soft demand and operational issues.
- Met-coal benchmark fell to $176/t, pressuring margins.
Insights
TL;DR: Mixed 8-K: softer revenue and dividend halt offset by grant, healthy liquidity and planned note issue; overall neutral impact.
Revenue guidance of $152-$154 MM is virtually flat YoY but implies sequential slippage vs. Q1, signalling margin pressure as the Australian benchmark retreats to $176/t. Dividend suspension confirms a defensive cash stance. Nevertheless, the balance-sheet shows $88 MM liquidity and management intends to tap the bond market for up to $100 MM, suggesting confidence in capital-market access. The $6.1 MM state grant de-risks the REE pilot and adds optionality beyond coal. Backlog coverage of 3.4 MM tons, with 1.4 MM tons fixed at $139/t, provides near-term revenue visibility. Net impact: neutral; investors will focus on final Q2 earnings and bond pricing.
TL;DR: Grant accelerates REE diversification, but met-coal headwinds and mine idling temper outlook; mildly positive long term.
The Brook Mine grant advances Ramaco’s strategy to monetise carbon-ore-rare-earth assets, potentially reducing future earnings cyclicality. Production rose 11 % YoY despite the Eagle mine pause, evidencing operational flexibility. Lower H1 capex versus 2024 preserves cash. Yet market softness and dividend suspension underscore volatility. If the $100 MM notes price within guidance and credit-facility amendment closes, funding for growth is secured without immediate equity dilution. Long-term diversification merits a slight positive bias.
Ramaco Resources (Nasdaq: METC) ha depositato un modulo 8-K divulgando dati non revisionati del secondo trimestre 2025 e diversi aggiornamenti strategici.
Riepilogo pre-risultati: si prevede che vendite di circa 1,0 milioni di tonnellate genereranno un fatturato di 152-154 milioni di dollari, leggermente inferiore ai 155,3 milioni di dollari dell'anno precedente e modestamente più debole rispetto al primo trimestre 2025. La liquidità al 30/06/25 era di 88 milioni di dollari (28 milioni in contanti; 60 milioni di disponibilità sul revolver). Gli investimenti nel primo semestre 2025 sono scesi a 35-36 milioni di dollari rispetto ai 40 milioni dell’anno precedente. L’arretrato contrattuale ammonta a 3,4 milioni di tonnellate: 1,4 milioni a prezzo fisso di 139 dollari/tonnellata e 2,0 milioni indicizzati, con due terzi consegnabili nel 2025.
Contesto operativo e di mercato: la produzione del secondo trimestre ha eguagliato le spedizioni a 1,0 milioni di tonnellate (in aumento da 0,9 milioni anno su anno); la miniera Eagle è stata temporaneamente fermata a causa del calo dei prezzi globali del carbone metallurgico (benchmark australiano a metà luglio: 176 dollari/tonnellata contro la media del primo trimestre di 185 dollari/tonnellata). Il Consiglio di Amministrazione ha sospeso il dividendo di Classe A dopo tre trimestri di pagamenti in azioni.
Azioni strategiche:
- Ottenuto un contributo di 6,1 milioni di dollari dalla Wyoming Energy Authority per avanzare il progetto pilota dell’impianto REE della miniera Brook; il Notice-to-Proceed è stato ricevuto il 17 giugno 2025.
- In corso di negoziazione una terza modifica alla linea di credito con KeyBank per consentire l’emissione di fino a 100 milioni di dollari in obbligazioni senior con scadenza 2030 e ridurre la capacità di debito non garantito aggiuntivo a 15 milioni di dollari.
Il documento contiene avvertenze sulle proiezioni future; i dati sono soggetti a conferma definitiva.
Ramaco Resources (Nasdaq: METC) presentó un formulario 8-K revelando datos no auditados del segundo trimestre de 2025 y varias actualizaciones estratégicas.
Resumen previo a resultados: se esperan ventas de aproximadamente 1.0 millones de toneladas que generarán ingresos de $152-$154 millones, ligeramente por debajo de $155.3 millones interanuales y modestamente inferior al primer trimestre de 2025. La liquidez al 30/06/25 fue de $88 millones (efectivo $28 millones; disponibilidad revolvente $60 millones). La inversión en el primer semestre de 2025 cayó a $35-36 millones desde $40 millones interanuales. El backlog de contratos totaliza 3.4 millones de toneladas: 1.4 millones a precio fijo de $139/tonelada y 2.0 millones indexados, con dos tercios entregables en 2025.
Contexto operativo y de mercado: la producción del segundo trimestre igualó los envíos en 1.0 millón de toneladas (subiendo desde 0.9 millones interanuales); la mina Eagle fue temporalmente detenida debido a la caída de los precios globales del carbón metalúrgico (referencia australiana a mediados de julio: $176/tonelada vs promedio del primer trimestre de $185/tonelada). La Junta suspendió el dividendo Clase A tras tres trimestres de pagos en acciones.
Acciones estratégicas:
- Se aseguró una subvención de $6.1 millones de la Wyoming Energy Authority para avanzar en la planta piloto de elementos de tierras raras (REE) de la mina Brook; el aviso para proceder se recibió el 17 de junio de 2025.
- Se negocia una tercera enmienda a la línea de crédito con KeyBank para permitir la emisión de hasta $100 millones en bonos senior con vencimiento en 2030 y reducir la capacidad adicional de deuda no garantizada a $15 millones.
El documento contiene advertencias sobre proyecciones futuras; las cifras están sujetas a cierre final.
Ramaco Resources (나스닥: METC)는 2025년 2분기 미감사 데이터를 포함한 8-K 보고서와 여러 전략적 업데이트를 제출했습니다.
실적 발표 전 요약: 약 100만 톤의 판매가 1억 5200만~1억 5400만 달러의 매출을 창출할 것으로 예상되며, 이는 전년 동기 1억 5530만 달러보다 약간 낮고 2025년 1분기보다 다소 약한 수준입니다. 2025년 6월 30일 기준 유동성은 8800만 달러(현금 2800만 달러, 리볼버 가능액 6000만 달러)였습니다. 2025년 상반기 자본 지출은 전년 4000만 달러에서 3500만~3600만 달러로 감소했습니다. 계약 잔액은 총 340만 톤으로, 140만 톤은 톤당 139달러 고정, 200만 톤은 지수 연동형이며 이 중 3분의 2는 2025년에 인도 예정입니다.
운영 및 시장 상황: 2분기 생산량은 100만 톤으로 출하량과 일치했으며(전년 90만 톤 대비 증가), Eagle 광산은 글로벌 금속탄소 가격 약세로 일시 가동 중단되었습니다(7월 중순 호주 벤치마크: 톤당 176달러, 1분기 평균 185달러 대비). 이사회는 3분기 연속 주식배당 후 Class A 배당금을 중단했습니다.
전략적 조치:
- 와이오밍 에너지 당국으로부터 610만 달러 보조금을 확보해 Brook 광산 희토류 원소(REE) 파일럿 플랜트 개발을 진행 중이며, 2025년 6월 17일 착수 통보를 받았습니다.
- KeyBank 신용 시설에 대한 세 번째 수정안을 협상 중이며, 2030년 만기 1억 달러까지의 선순위 채권 발행을 허용하고 추가 무담보 부채 한도를 1500만 달러로 줄이는 방안을 추진하고 있습니다.
보고서에는 미래 예측에 관한 주의 문구가 포함되어 있으며, 수치는 최종 마감 시 변경될 수 있습니다.
Ramaco Resources (Nasdaq : METC) a déposé un formulaire 8-K divulguant des données non auditées du deuxième trimestre 2025 ainsi que plusieurs mises à jour stratégiques.
Résumé avant résultats : des ventes d’environ 1,0 million de tonnes devraient générer un chiffre d’affaires de 152-154 millions de dollars, légèrement inférieur aux 155,3 millions de dollars de l’année précédente et modestement plus faible que le premier trimestre 2025. La liquidité au 30/06/25 s’élevait à 88 millions de dollars (28 millions en cash ; 60 millions de disponibilité sur la ligne de crédit renouvelable). Les dépenses d’investissement du premier semestre 2025 ont diminué à 35-36 millions de dollars contre 40 millions l’an dernier. Le carnet de commandes totalise 3,4 millions de tonnes : 1,4 million à prix fixe de 139 $/t et 2,0 millions indexées, dont deux tiers livrables en 2025.
Contexte opérationnel et marché : la production du deuxième trimestre a égalé les expéditions à 1,0 million de tonnes (en hausse par rapport à 0,9 million l’an passé) ; la mine Eagle a été temporairement mise à l’arrêt en raison de la baisse des prix mondiaux du charbon métallurgique (référence australienne mi-juillet : 176 $/t contre une moyenne de 185 $/t au premier trimestre). Le conseil d’administration a suspendu le dividende de Classe A après trois trimestres de paiements en actions.
Actions stratégiques :
- Obtention d’une subvention de 6,1 millions de dollars de la Wyoming Energy Authority pour faire avancer la centrale pilote REE de la mine Brook ; le « Notice-to-Proceed » a été reçu le 17 juin 2025.
- Négociation d’une troisième modification de la facilité de crédit KeyBank pour permettre l’émission de 100 millions de dollars d’obligations senior arrivant à échéance en 2030 et réduire la capacité de dette non garantie supplémentaire à 15 millions de dollars.
Le dépôt contient des avertissements prospectifs ; les chiffres restent soumis à la clôture finale.
Ramaco Resources (Nasdaq: METC) hat eine 8-K Meldung eingereicht, in der ungeprüfte Daten für das zweite Quartal 2025 und mehrere strategische Updates veröffentlicht wurden.
Vorläufige Ergebnisübersicht: Der Verkauf von ca. 1,0 Mio. Tonnen soll einen Umsatz von 152-154 Mio. USD generieren, was geringfügig unter den 155,3 Mio. USD des Vorjahres liegt und leicht schwächer als im ersten Quartal 2025 ist. Die Liquidität zum 30.06.25 betrug 88 Mio. USD (Barmittel 28 Mio. USD; revolvierende Kreditlinie 60 Mio. USD). Die Investitionsausgaben im ersten Halbjahr 2025 sanken auf 35-36 Mio. USD von 40 Mio. USD im Vorjahr. Der Auftragsbestand beläuft sich auf 3,4 Mio. Tonnen: 1,4 Mio. Tonnen zu einem Festpreis von 139 USD/t und 2,0 Mio. Tonnen indexgebunden, wovon zwei Drittel im Jahr 2025 geliefert werden.
Betrieblicher und Markt-Kontext: Die Produktion im zweiten Quartal entsprach den Lieferungen mit 1,0 Mio. Tonnen (Steigerung von 0,9 Mio. im Vorjahr); die Eagle-Mine wurde vorübergehend stillgelegt aufgrund schwächerer globaler Metallkohlenstoffpreise (australischer Benchmark Mitte Juli: 176 USD/t vs. Q1-Durchschnitt 185 USD/t). Der Vorstand hat nach drei Quartalen mit Aktiendividenden die Dividende der Klasse A ausgesetzt.
Strategische Maßnahmen:
- Erhielt einen 6,1 Mio. USD Zuschuss der Wyoming Energy Authority zur Weiterentwicklung der Brook-Mine REE-Pilotanlage; Notice-to-Proceed am 17. Juni 2025 erhalten.
- Verhandelt eine dritte Änderung der Kreditfazilität mit KeyBank, um die Ausgabe von bis zu 100 Mio. USD Senior Notes mit Fälligkeit 2030 zu ermöglichen und die zusätzliche unbesicherte Kreditkapazität auf 15 Mio. USD zu reduzieren.
Die Meldung enthält vorsorgliche zukunftsgerichtete Aussagen; Zahlen sind noch vor endgültigem Abschluss vorbehaltlich.