0001879016false12-312025-12-312025FY.50.500.5.125.333.333.333.2.2.2.2.2.333.333.333iso4217:USDxbrli:sharesiso4217:USDxbrli:sharesxbrli:pureie:unitie:transmitterie:trancheutr:sqkmie:directorie:installmentie:transmittersie:segment00018790162025-01-012025-12-3100018790162025-06-3000018790162026-02-2300018790162025-12-3100018790162024-12-310001879016us-gaap:RelatedPartyMember2025-12-310001879016us-gaap:RelatedPartyMember2024-12-3100018790162024-01-012024-12-3100018790162023-01-012023-12-310001879016us-gaap:CommonStockMember2022-12-310001879016us-gaap:AdditionalPaidInCapitalMember2022-12-310001879016us-gaap:RetainedEarningsMember2022-12-310001879016us-gaap:AociIncludingPortionAttributableToNoncontrollingInterestMember2022-12-310001879016us-gaap:NoncontrollingInterestMember2022-12-3100018790162022-12-310001879016us-gaap:RetainedEarningsMember2023-01-012023-12-310001879016us-gaap:NoncontrollingInterestMember2023-01-012023-12-310001879016us-gaap:AociIncludingPortionAttributableToNoncontrollingInterestMember2023-01-012023-12-310001879016ie:PublicStockOfferingAndSubscriptionAgreementMemberus-gaap:CommonStockMember2023-01-012023-12-310001879016ie:PublicStockOfferingAndSubscriptionAgreementMemberus-gaap:AdditionalPaidInCapitalMember2023-01-012023-12-310001879016ie:PublicStockOfferingAndSubscriptionAgreementMember2023-01-012023-12-310001879016us-gaap:CommonStockMember2023-01-012023-12-310001879016us-gaap:AdditionalPaidInCapitalMember2023-01-012023-12-310001879016us-gaap:CommonStockMember2023-12-310001879016us-gaap:AdditionalPaidInCapitalMember2023-12-310001879016us-gaap:RetainedEarningsMember2023-12-310001879016us-gaap:AociIncludingPortionAttributableToNoncontrollingInterestMember2023-12-310001879016us-gaap:NoncontrollingInterestMember2023-12-3100018790162023-12-310001879016us-gaap:RetainedEarningsMember2024-01-012024-12-310001879016us-gaap:NoncontrollingInterestMember2024-01-012024-12-310001879016us-gaap:AociIncludingPortionAttributableToNoncontrollingInterestMember2024-01-012024-12-310001879016us-gaap:CommonStockMember2024-01-012024-12-310001879016us-gaap:AdditionalPaidInCapitalMember2024-01-012024-12-310001879016us-gaap:CommonStockMember2024-12-310001879016us-gaap:AdditionalPaidInCapitalMember2024-12-310001879016us-gaap:RetainedEarningsMember2024-12-310001879016us-gaap:AociIncludingPortionAttributableToNoncontrollingInterestMember2024-12-310001879016us-gaap:NoncontrollingInterestMember2024-12-310001879016us-gaap:RetainedEarningsMember2025-01-012025-12-310001879016us-gaap:NoncontrollingInterestMember2025-01-012025-12-310001879016us-gaap:AociIncludingPortionAttributableToNoncontrollingInterestMember2025-01-012025-12-310001879016us-gaap:CommonStockMember2025-01-012025-12-310001879016us-gaap:AdditionalPaidInCapitalMember2025-01-012025-12-310001879016us-gaap:CommonStockMember2025-12-310001879016us-gaap:AdditionalPaidInCapitalMember2025-12-310001879016us-gaap:RetainedEarningsMember2025-12-310001879016us-gaap:AociIncludingPortionAttributableToNoncontrollingInterestMember2025-12-310001879016us-gaap:NoncontrollingInterestMember2025-12-310001879016ie:MaadenMember2025-12-310001879016ie:VrbEnergyIncMembersrt:SubsidiariesMember2025-12-310001879016ie:VrbEnergyIncMembersrt:SubsidiariesMember2024-12-310001879016ie:VRBChinaMemberie:VRBEnergyIncMember2025-12-310001879016ie:VRBChinaMemberie:VRBEnergyIncMember2024-12-310001879016ie:ComputationalGeosciencesIncMembersrt:SubsidiariesMember2025-12-310001879016ie:ComputationalGeosciencesIncMembersrt:SubsidiariesMember2024-12-310001879016ie:CordobaMineralsCorpMembersrt:SubsidiariesMember2025-12-310001879016ie:CordobaMineralsCorpMembersrt:SubsidiariesMember2024-12-310001879016srt:MinimumMemberie:EquipmentAndVehiclesMember2025-12-310001879016srt:MaximumMemberie:EquipmentAndVehiclesMember2025-12-310001879016srt:MinimumMemberus-gaap:ComputerEquipmentMember2025-12-310001879016srt:MaximumMemberus-gaap:ComputerEquipmentMember2025-12-310001879016srt:MinimumMemberie:PatentAndLicenseMember2025-12-310001879016srt:MaximumMemberie:PatentAndLicenseMember2025-12-310001879016srt:MinimumMemberus-gaap:ComputerSoftwareIntangibleAssetMember2025-12-310001879016srt:MaximumMemberus-gaap:ComputerSoftwareIntangibleAssetMember2025-12-310001879016ie:BHPMineralResourcesIncMember2024-05-072024-05-070001879016ie:BHPMineralResourcesIncMember2024-05-070001879016ie:BHPMineralResourcesIncMember2025-12-310001879016ie:BHPMineralResourcesIncMember2025-01-012025-12-310001879016ie:BHPMineralResourcesIncMember2024-01-012024-12-310001879016us-gaap:DisposalGroupDisposedOfBySaleNotDiscontinuedOperationsMemberie:VRBChinaMemberie:VRBMember2024-12-310001879016us-gaap:DisposalGroupDisposedOfBySaleNotDiscontinuedOperationsMemberie:VRBChinaMemberie:VRBMember2024-01-012024-12-310001879016us-gaap:DisposalGroupDisposedOfBySaleNotDiscontinuedOperationsMemberie:VRBChinaMemberie:VRBMember2025-12-310001879016ie:MaadenMember2023-12-310001879016ie:VRBChinaMember2023-12-310001879016ie:SamaNickelCorporationSNCMember2023-12-310001879016ie:OtherEquityMethodMember2023-12-310001879016ie:SamaResourcesIncMember2023-12-310001879016ie:VRBChinaMember2024-01-012024-12-310001879016ie:OtherEquityMethodMember2024-01-012024-12-310001879016ie:MaadenMember2024-01-012024-12-310001879016ie:SamaNickelCorporationSNCMember2024-01-012024-12-310001879016ie:SamaResourcesIncMember2024-01-012024-12-310001879016ie:MaadenMember2024-12-310001879016ie:VRBChinaMember2024-12-310001879016ie:SamaNickelCorporationSNCMember2024-12-310001879016ie:OtherEquityMethodMember2024-12-310001879016ie:SamaResourcesIncMember2024-12-310001879016ie:MaadenMember2025-01-012025-12-310001879016ie:VRBChinaMember2025-01-012025-12-310001879016ie:SamaNickelCorporationSNCMember2025-01-012025-12-310001879016ie:OtherEquityMethodMember2025-01-012025-12-310001879016ie:SamaResourcesIncMember2025-01-012025-12-310001879016ie:VRBChinaMember2025-12-310001879016ie:SamaNickelCorporationSNCMember2025-12-310001879016ie:OtherEquityMethodMember2025-12-310001879016ie:SamaResourcesIncMember2025-12-310001879016ie:MaadenMember2023-05-150001879016ie:MaadenMember2025-12-310001879016ie:MaadenMember2024-12-310001879016ie:MaadenMember2025-01-012025-12-310001879016ie:MaadenMember2024-01-012024-12-310001879016ie:MaadenMemberus-gaap:SubsequentEventMember2026-01-012026-01-310001879016ie:VRBChinaMemberie:VRBMember2024-10-140001879016ie:VRBChinaMemberie:VRBMember2024-10-150001879016ie:VRBChinaMember2025-01-012025-12-310001879016ie:VRBChinaMember2024-01-012024-12-310001879016ie:VRBChinaMember2025-09-300001879016ie:VRBChinaMember2024-12-310001879016ie:VRBChinaMember2025-01-012025-09-300001879016ie:VRBChinaMember2024-10-012024-12-310001879016ie:SamaNickelCorporationSNCMember2024-03-110001879016ie:SamaNickelCorporationSNCMemberus-gaap:VariableInterestEntityPrimaryBeneficiaryMember2024-03-110001879016ie:SamaResourcesIncMember2025-12-310001879016ie:SamaResourcesIncMember2024-12-310001879016ie:SantaCruzCopperProjectMember2023-12-310001879016ie:TinticProjectMember2023-12-310001879016ie:AlacranCopperProjectMember2023-12-310001879016ie:OtherProjectMember2023-12-310001879016ie:SantaCruzCopperProjectMember2024-01-012024-12-310001879016ie:TinticProjectMember2024-01-012024-12-310001879016ie:AlacranCopperProjectMember2024-01-012024-12-310001879016ie:OtherProjectMember2024-01-012024-12-310001879016ie:SantaCruzCopperProjectMember2024-12-310001879016ie:TinticProjectMember2024-12-310001879016ie:AlacranCopperProjectMember2024-12-310001879016ie:OtherProjectMember2024-12-310001879016ie:SantaCruzCopperProjectMember2025-01-012025-12-310001879016ie:TinticProjectMember2025-01-012025-12-310001879016ie:AlacranCopperProjectMember2025-01-012025-12-310001879016ie:OtherProjectMember2025-01-012025-12-310001879016ie:SantaCruzCopperProjectMember2025-12-310001879016ie:TinticProjectMember2025-12-310001879016ie:AlacranCopperProjectMember2025-12-310001879016ie:OtherProjectMember2025-12-310001879016ie:DRHEMemberie:SantaCruzCopperProjectMember2021-01-012021-12-310001879016ie:SantaCruzCopperProjectMember2024-08-012024-08-310001879016us-gaap:LineOfCreditMemberie:SantaCruzCopperProjectMemberie:BridgeFacilityMemberus-gaap:SecuredDebtMember2025-12-120001879016us-gaap:LineOfCreditMemberie:SantaCruzCopperProjectMemberie:BridgeFacilityMemberus-gaap:SecuredDebtMember2025-12-122025-12-120001879016us-gaap:LineOfCreditMemberie:SantaCruzCopperProjectMemberie:BridgeFacilityMemberie:A6thMonthMemberus-gaap:SecuredDebtMember2025-12-122025-12-120001879016us-gaap:LineOfCreditMemberie:SantaCruzCopperProjectMemberie:BridgeFacilityMemberie:A12thMonthMemberus-gaap:SecuredDebtMember2025-12-122025-12-120001879016us-gaap:LineOfCreditMemberie:SantaCruzCopperProjectMemberie:BridgeFacilityMemberie:A18thMonthMemberus-gaap:SecuredDebtMember2025-12-122025-12-120001879016us-gaap:LineOfCreditMemberie:SantaCruzCopperProjectMemberie:BridgeFacilityMemberie:UntilJune302026Memberus-gaap:SecuredDebtMember2025-12-122025-12-120001879016ie:TinticProjectMember2025-12-310001879016ie:SantaCruzCopperProjectMemberie:BridgeFacilityMemberus-gaap:SecuredDebtMemberie:EverySixMonthPeriodAfterJune302026Member2025-01-012025-12-310001879016us-gaap:NonrelatedPartyMember2025-12-310001879016us-gaap:NonrelatedPartyMember2024-12-310001879016ie:ConvertibleBondsMember2023-12-310001879016ie:ConvertibleBondsMember2024-01-012024-12-310001879016ie:ConvertibleBondsMember2024-12-310001879016ie:ConvertibleBondsMember2025-01-012025-12-310001879016ie:ConvertibleBondsMember2025-12-310001879016ie:VRBConvertibleBondMember2021-07-082021-07-080001879016ie:VRBConvertibleBondMember2021-07-080001879016ie:VRBConvertibleBondMembersrt:MaximumMember2021-07-082021-07-080001879016ie:PublicStockOfferingMember2025-02-142025-02-140001879016ie:PublicStockOfferingMember2025-02-140001879016ie:PublicStockOfferingMember2025-01-012025-12-310001879016ie:PublicStockOfferingMemberus-gaap:SubsequentEventMember2026-01-012026-02-230001879016ie:PublicStockOfferingMember2025-10-232025-10-230001879016ie:PublicStockOfferingMember2025-10-230001879016us-gaap:OverAllotmentOptionMember2025-10-272025-10-2700018790162025-10-232025-10-270001879016ie:PublicStockOfferingMember2025-10-272025-10-270001879016ie:KaizenMembersrt:SubsidiariesMember2024-02-050001879016ie:KaizenMembersrt:SubsidiariesMember2024-02-060001879016ie:KaizenMembersrt:SubsidiariesMember2024-02-062024-02-060001879016ie:MaadenMember2023-07-062023-07-060001879016ie:IvanhoeElectricMemberie:MaadenMember2023-07-060001879016ie:MaadenMember2023-07-060001879016ie:IvanhoeElectricMembersrt:MaximumMemberie:MaadenMember2023-07-060001879016ie:PublicStockOfferingMember2023-09-182023-09-180001879016ie:PublicStockOfferingMember2023-09-180001879016ie:IvanhoeElectricMemberie:MaadenMemberie:MaadenMember2023-10-230001879016ie:MaadenMemberus-gaap:PrivatePlacementMember2023-10-232023-10-230001879016ie:MaadenMemberus-gaap:PrivatePlacementMember2023-10-230001879016ie:IvanhoeElectricIncentivePlanMember2025-01-012025-12-310001879016ie:IvanhoeElectricIncentivePlanMember2024-01-012024-12-310001879016ie:IvanhoeElectricIncentivePlanMember2023-01-012023-12-310001879016ie:NonWhollyOwnedSubsidiariesMember2025-01-012025-12-310001879016ie:NonWhollyOwnedSubsidiariesMember2024-01-012024-12-310001879016ie:NonWhollyOwnedSubsidiariesMember2023-01-012023-12-310001879016us-gaap:GeneralAndAdministrativeExpenseMember2025-01-012025-12-310001879016us-gaap:GeneralAndAdministrativeExpenseMember2024-01-012024-12-310001879016us-gaap:GeneralAndAdministrativeExpenseMember2023-01-012023-12-310001879016ie:ExplorationExpenseMember2025-01-012025-12-310001879016ie:ExplorationExpenseMember2024-01-012024-12-310001879016ie:ExplorationExpenseMember2023-01-012023-12-310001879016us-gaap:ResearchAndDevelopmentExpenseMember2025-01-012025-12-310001879016us-gaap:ResearchAndDevelopmentExpenseMember2024-01-012024-12-310001879016us-gaap:ResearchAndDevelopmentExpenseMember2023-01-012023-12-310001879016us-gaap:CostOfSalesMember2025-01-012025-12-310001879016us-gaap:CostOfSalesMember2024-01-012024-12-310001879016us-gaap:CostOfSalesMember2023-01-012023-12-310001879016ie:LongTermIncentivePlanMember2025-12-310001879016us-gaap:EmployeeStockOptionMember2024-12-310001879016us-gaap:EmployeeStockOptionMember2023-12-310001879016us-gaap:EmployeeStockOptionMember2024-01-012024-12-310001879016us-gaap:EmployeeStockOptionMember2023-01-012023-12-310001879016us-gaap:EmployeeStockOptionMember2025-01-012025-12-310001879016us-gaap:RestrictedStockUnitsRSUMember2023-01-012023-01-010001879016us-gaap:RestrictedStockUnitsRSUMember2023-01-010001879016us-gaap:RestrictedStockUnitsRSUMember2025-03-062025-03-060001879016us-gaap:RestrictedStockUnitsRSUMember2025-03-060001879016us-gaap:RestrictedStockUnitsRSUMember2022-12-310001879016us-gaap:RestrictedStockUnitsRSUMember2023-01-012023-12-310001879016us-gaap:RestrictedStockUnitsRSUMember2023-12-310001879016us-gaap:RestrictedStockUnitsRSUMember2024-01-012024-12-310001879016us-gaap:RestrictedStockUnitsRSUMember2024-12-310001879016us-gaap:RestrictedStockUnitsRSUMember2025-01-012025-12-310001879016us-gaap:RestrictedStockUnitsRSUMember2025-12-310001879016srt:MinimumMemberus-gaap:PerformanceSharesMember2025-03-062025-03-060001879016srt:MaximumMemberus-gaap:PerformanceSharesMember2025-03-062025-03-060001879016us-gaap:PerformanceSharesMember2025-03-062025-03-060001879016us-gaap:PerformanceSharesMember2025-03-060001879016country:USus-gaap:PerformanceSharesMember2025-03-062025-03-060001879016country:CAus-gaap:PerformanceSharesMember2025-03-062025-03-060001879016us-gaap:PerformanceSharesMember2025-01-012025-12-310001879016us-gaap:PerformanceSharesMember2025-12-310001879016us-gaap:EmployeeStockOptionMemberus-gaap:ShareBasedCompensationAwardTrancheThreeMember2022-11-212022-11-210001879016us-gaap:EmployeeStockOptionMemberus-gaap:ShareBasedCompensationAwardTrancheTwoMember2022-11-212022-11-210001879016us-gaap:EmployeeStockOptionMemberus-gaap:ShareBasedCompensationAwardTrancheOneMember2022-11-212022-11-210001879016us-gaap:RestrictedStockUnitsRSUMemberus-gaap:ShareBasedCompensationAwardTrancheTwoMember2023-01-012023-01-010001879016us-gaap:RestrictedStockUnitsRSUMemberie:ShareBasedPaymentArrangementTrancheFourMember2023-01-012023-01-010001879016us-gaap:RestrictedStockUnitsRSUMemberus-gaap:ShareBasedCompensationAwardTrancheOneMember2023-01-012023-01-010001879016us-gaap:RestrictedStockUnitsRSUMemberus-gaap:ShareBasedCompensationAwardTrancheThreeMember2023-01-012023-01-010001879016us-gaap:RestrictedStockUnitsRSUMemberie:ShareBasedPaymentArrangementTrancheFiveMember2023-01-012023-01-010001879016us-gaap:RestrictedStockUnitsRSUMemberus-gaap:ShareBasedCompensationAwardTrancheTwoMember2022-11-212022-11-210001879016us-gaap:RestrictedStockUnitsRSUMemberus-gaap:ShareBasedCompensationAwardTrancheOneMember2022-11-212022-11-210001879016us-gaap:RestrictedStockUnitsRSUMemberus-gaap:ShareBasedCompensationAwardTrancheThreeMember2022-11-212022-11-210001879016ie:DataProcessingServicesMember2025-01-012025-12-310001879016ie:DataProcessingServicesMember2024-01-012024-12-310001879016ie:DataProcessingServicesMember2023-01-012023-12-310001879016ie:RenewableEnergyStorageSystemsMember2025-01-012025-12-310001879016ie:RenewableEnergyStorageSystemsMember2024-01-012024-12-310001879016ie:RenewableEnergyStorageSystemsMember2023-01-012023-12-310001879016ie:SantaCruzUSAMember2025-01-012025-12-310001879016ie:SantaCruzUSAMember2024-01-012024-12-310001879016ie:SantaCruzUSAMember2023-01-012023-12-310001879016ie:AlacranColombiaMember2025-01-012025-12-310001879016ie:AlacranColombiaMember2024-01-012024-12-310001879016ie:AlacranColombiaMember2023-01-012023-12-310001879016ie:GleesonUSAMember2025-01-012025-12-310001879016ie:GleesonUSAMember2024-01-012024-12-310001879016ie:GleesonUSAMember2023-01-012023-12-310001879016ie:TINTICMember2025-01-012025-12-310001879016ie:TINTICMember2024-01-012024-12-310001879016ie:TINTICMember2023-01-012023-12-310001879016ie:HogHeavenUSAMember2025-01-012025-12-310001879016ie:HogHeavenUSAMember2024-01-012024-12-310001879016ie:HogHeavenUSAMember2023-01-012023-12-310001879016ie:ProjectGenerationAndOtherMember2025-01-012025-12-310001879016ie:ProjectGenerationAndOtherMember2024-01-012024-12-310001879016ie:ProjectGenerationAndOtherMember2023-01-012023-12-310001879016ie:HogHeavenUSAMember2025-12-310001879016us-gaap:DisposalGroupHeldforsaleNotDiscontinuedOperationsMemberie:VRBChinaMemberie:RedSunMember2024-10-310001879016us-gaap:DisposalGroupHeldforsaleNotDiscontinuedOperationsMemberie:VRBChinaMember2024-10-312024-10-310001879016us-gaap:DisposalGroupHeldforsaleNotDiscontinuedOperationsMemberie:VRBChinaMember2024-10-152024-10-150001879016us-gaap:DisposalGroupHeldforsaleNotDiscontinuedOperationsMemberie:VRBChinaMember2024-01-012024-12-310001879016us-gaap:DisposalGroupHeldforsaleNotDiscontinuedOperationsMemberie:VRBChinaMember2025-01-012025-12-310001879016us-gaap:DisposalGroupHeldforsaleNotDiscontinuedOperationsMemberie:VRBChinaMemberie:VRBMember2024-10-150001879016us-gaap:DisposalGroupHeldforsaleNotDiscontinuedOperationsMemberie:VRBChinaMemberie:VRBMember2024-10-152024-10-150001879016us-gaap:DisposalGroupHeldforsaleNotDiscontinuedOperationsMemberie:VRBChinaMemberie:VRBMember2025-12-310001879016us-gaap:DisposalGroupHeldforsaleNotDiscontinuedOperationsMemberie:VRBChinaMember2025-12-310001879016ie:AlacranProjectMemberie:CordobaMember2023-05-082023-05-080001879016ie:CMHMemberie:JCHXMiningManagementCoLtdMember2023-05-080001879016ie:AlacranProjectMemberie:JCHXMiningManagementCoLtdMember2023-05-0800018790162023-05-080001879016ie:FirstInstallmentMemberie:CMHMemberie:JCHXMiningManagementCoLtdMember2023-05-082023-05-080001879016ie:SecondInstallmentMemberie:CMHMemberie:JCHXMiningManagementCoLtdMember2024-01-042024-01-040001879016ie:ThirdInstallmentMemberie:CMHMemberie:JCHXMiningManagementCoLtdMember2025-12-3100018790162023-05-082023-05-080001879016ie:AlacranCopperProjectMemberus-gaap:RelatedPartyMemberie:CordobaMember2025-05-080001879016ie:AlacranCopperProjectMemberus-gaap:RelatedPartyMemberie:JCHXMiningManagementCoLtdMember2025-05-082025-05-080001879016ie:AlacranCopperProjectMemberus-gaap:RelatedPartyMemberie:JCHXMiningManagementCoLtdMember2025-05-080001879016ie:AlacranCopperProjectMemberus-gaap:RelatedPartyMemberie:JCHXMiningManagementCoLtdMemberus-gaap:SubsequentEventMember2026-02-102026-02-100001879016us-gaap:RelatedPartyMemberie:JCHXMiningManagementCoLtdMemberus-gaap:SubsequentEventMember2026-02-100001879016ie:KaizenMember2023-12-310001879016ie:VRBMember2023-12-310001879016ie:CordobaMember2023-12-310001879016ie:CGIMember2023-12-310001879016ie:SamaNickelCorporationSNCMember2023-12-310001879016ie:KaizenMember2024-01-012024-12-310001879016ie:VRBMember2024-01-012024-12-310001879016ie:CordobaMember2024-01-012024-12-310001879016ie:CGIMember2024-01-012024-12-310001879016ie:SamaNickelCorporationSNCMember2024-01-012024-12-310001879016ie:KaizenMember2024-12-310001879016ie:VRBMember2024-12-310001879016ie:CordobaMember2024-12-310001879016ie:CGIMember2024-12-310001879016ie:SamaNickelCorporationSNCMember2024-12-310001879016ie:KaizenMember2025-01-012025-12-310001879016ie:VRBMember2025-01-012025-12-310001879016ie:CordobaMember2025-01-012025-12-310001879016ie:CGIMember2025-01-012025-12-310001879016ie:SamaNickelCorporationSNCMember2025-01-012025-12-310001879016ie:KaizenMember2025-12-310001879016ie:VRBMember2025-12-310001879016ie:CordobaMember2025-12-310001879016ie:CGIMember2025-12-310001879016ie:SamaNickelCorporationSNCMember2025-12-310001879016ie:VRBMember2025-12-310001879016ie:CordobaMember2025-12-310001879016ie:CGIMember2025-12-310001879016ie:SamaNickelCorporationSNCMember2025-12-310001879016ie:VRBMembersrt:NonGuarantorSubsidiariesMember2025-12-310001879016ie:CordobaMembersrt:NonGuarantorSubsidiariesMember2025-12-310001879016ie:CGIMembersrt:NonGuarantorSubsidiariesMember2025-12-310001879016ie:SamaNickelCorporationSNCMembersrt:NonGuarantorSubsidiariesMember2025-12-310001879016srt:NonGuarantorSubsidiariesMember2025-12-310001879016ie:VRBMember2025-12-310001879016country:US2025-01-012025-12-310001879016country:US2024-01-012024-12-310001879016country:US2023-01-012023-12-310001879016us-gaap:ForeignCountryMember2025-01-012025-12-310001879016us-gaap:ForeignCountryMember2024-01-012024-12-310001879016us-gaap:ForeignCountryMember2023-01-012023-12-310001879016us-gaap:DomesticCountryMember2025-12-310001879016us-gaap:ForeignCountryMemberus-gaap:CanadaRevenueAgencyMember2025-12-310001879016us-gaap:ForeignCountryMemberie:TheNationalDirectorateOfTaxesAndCustomsColombiaMember2025-12-310001879016us-gaap:ForeignCountryMemberus-gaap:InlandRevenueSingaporeIRASMember2025-12-310001879016ie:GlobalMiningMemberus-gaap:RelatedPartyMember2025-12-310001879016ie:GlobalMiningMemberus-gaap:RelatedPartyMember2024-12-310001879016ie:GlobalMiningMemberus-gaap:RelatedPartyMember2025-01-012025-12-310001879016ie:GlobalMiningMemberus-gaap:RelatedPartyMember2024-01-012024-12-310001879016ie:GlobalMiningMemberus-gaap:RelatedPartyMember2023-01-012023-12-310001879016ie:IvanhoeCapitalAviationMemberus-gaap:RelatedPartyMember2025-12-310001879016ie:IvanhoeCapitalAviationMemberus-gaap:RelatedPartyMember2024-12-310001879016ie:IvanhoeCapitalAviationMemberus-gaap:RelatedPartyMember2025-01-012025-12-310001879016ie:IvanhoeCapitalAviationMemberus-gaap:RelatedPartyMember2024-01-012024-12-310001879016ie:IvanhoeCapitalAviationMemberus-gaap:RelatedPartyMember2023-01-012023-12-310001879016ie:HighWaterHoldingCompanyMemberus-gaap:RelatedPartyMember2025-12-310001879016ie:HighWaterHoldingCompanyMemberus-gaap:RelatedPartyMember2024-12-310001879016ie:HighWaterHoldingCompanyMemberus-gaap:RelatedPartyMember2025-01-012025-12-310001879016ie:HighWaterHoldingCompanyMemberus-gaap:RelatedPartyMember2024-01-012024-12-310001879016ie:HighWaterHoldingCompanyMemberus-gaap:RelatedPartyMember2023-01-012023-12-310001879016ie:IPulseIncMemberus-gaap:RelatedPartyMember2025-12-310001879016ie:IPulseIncMemberus-gaap:RelatedPartyMember2024-12-310001879016ie:IPulseIncMemberus-gaap:RelatedPartyMember2025-01-012025-12-310001879016ie:IPulseIncMemberus-gaap:RelatedPartyMember2024-01-012024-12-310001879016ie:IPulseIncMemberus-gaap:RelatedPartyMember2023-01-012023-12-310001879016ie:JCHXMiningManagementCoLtdMemberus-gaap:RelatedPartyMember2025-12-310001879016ie:JCHXMiningManagementCoLtdMemberus-gaap:RelatedPartyMember2024-12-310001879016ie:JCHXMiningManagementCoLtdMemberus-gaap:RelatedPartyMember2025-01-012025-12-310001879016ie:JCHXMiningManagementCoLtdMemberus-gaap:RelatedPartyMember2024-01-012024-12-310001879016ie:JCHXMiningManagementCoLtdMemberus-gaap:RelatedPartyMember2023-01-012023-12-310001879016us-gaap:RelatedPartyMember2025-01-012025-12-310001879016us-gaap:RelatedPartyMember2024-01-012024-12-310001879016us-gaap:RelatedPartyMember2023-01-012023-12-310001879016ie:MaadenMemberus-gaap:RelatedPartyMember2025-12-310001879016ie:MaadenMemberus-gaap:RelatedPartyMember2024-12-310001879016ie:MaadenMemberus-gaap:RelatedPartyMember2025-01-012025-12-310001879016ie:MaadenMemberus-gaap:RelatedPartyMember2024-01-012024-12-310001879016ie:MaadenMemberus-gaap:RelatedPartyMember2023-01-012023-12-310001879016ie:IPulseIncMemberus-gaap:RelatedPartyMember2022-10-242022-10-240001879016ie:IPulseIncMemberie:PurchasePriceOfTransmittersMember2022-10-242022-10-240001879016ie:IPulseIncMemberus-gaap:RelatedPartyMember2022-10-012022-10-310001879016ie:IPulseIncMemberus-gaap:RelatedPartyMember2025-12-310001879016ie:CordobaMemberus-gaap:RelatedPartyMemberie:CordobaMemberie:JCHXMiningManagementCoLtdMember2025-12-310001879016ie:CordobaMemberus-gaap:RelatedPartyMemberie:CordobaMemberie:JCHXMiningManagementCoLtdMember2024-12-310001879016us-gaap:RelatedPartyMemberie:JCHXMiningManagementCoLtdMemberie:JCHXBridgeLoanMemberus-gaap:BridgeLoanMemberie:CordobaMember2024-12-310001879016us-gaap:RelatedPartyMemberie:JCHXMiningManagementCoLtdMemberie:JCHXBridgeLoanMemberus-gaap:BridgeLoanMemberie:CordobaMember2024-12-012024-12-310001879016us-gaap:RelatedPartyMemberie:JCHXMiningManagementCoLtdMemberie:JCHXBridgeLoanMemberus-gaap:BridgeLoanMemberie:CordobaMember2025-01-012025-01-310001879016us-gaap:RelatedPartyMemberie:JCHXMiningManagementCoLtdMemberie:JCHXBridgeLoanMemberus-gaap:BridgeLoanMemberie:CordobaMember2025-06-012025-06-300001879016ie:AlacranCopperProjectMemberus-gaap:RelatedPartyMemberie:JCHXMiningManagementCoLtdMember2023-05-310001879016us-gaap:FairValueInputsLevel1Member2025-12-310001879016us-gaap:FairValueInputsLevel2Member2025-12-310001879016us-gaap:FairValueInputsLevel3Member2025-12-310001879016us-gaap:FairValueInputsLevel1Member2024-12-310001879016us-gaap:FairValueInputsLevel2Member2024-12-310001879016us-gaap:FairValueInputsLevel3Member2024-12-310001879016us-gaap:OperatingSegmentsMemberie:SantaCruzCopperProjectSegmentMember2025-01-012025-12-310001879016us-gaap:OperatingSegmentsMemberie:CriticalMetalsSegmentMember2025-01-012025-12-310001879016us-gaap:OperatingSegmentsMemberie:DataProcessingSegmentMember2025-01-012025-12-310001879016us-gaap:OperatingSegmentsMemberie:EnergyStorageSegmentMember2025-01-012025-12-310001879016us-gaap:OperatingSegmentsMember2025-01-012025-12-310001879016us-gaap:IntersegmentEliminationMemberie:SantaCruzCopperProjectSegmentMember2025-01-012025-12-310001879016us-gaap:IntersegmentEliminationMemberie:CriticalMetalsSegmentMember2025-01-012025-12-310001879016us-gaap:IntersegmentEliminationMemberie:DataProcessingSegmentMember2025-01-012025-12-310001879016us-gaap:IntersegmentEliminationMemberie:EnergyStorageSegmentMember2025-01-012025-12-310001879016us-gaap:IntersegmentEliminationMember2025-01-012025-12-310001879016us-gaap:OperatingSegmentsMemberie:SantaCruzCopperProjectSegmentMember2025-12-310001879016us-gaap:OperatingSegmentsMemberie:CriticalMetalsSegmentMember2025-12-310001879016us-gaap:OperatingSegmentsMemberie:DataProcessingSegmentMember2025-12-310001879016us-gaap:OperatingSegmentsMemberie:EnergyStorageSegmentMember2025-12-310001879016us-gaap:OperatingSegmentsMember2025-12-310001879016us-gaap:OperatingSegmentsMemberie:SantaCruzCopperProjectSegmentMember2024-01-012024-12-310001879016us-gaap:OperatingSegmentsMemberie:CriticalMetalsSegmentMember2024-01-012024-12-310001879016us-gaap:OperatingSegmentsMemberie:DataProcessingSegmentMember2024-01-012024-12-310001879016us-gaap:OperatingSegmentsMemberie:EnergyStorageSegmentMember2024-01-012024-12-310001879016us-gaap:OperatingSegmentsMember2024-01-012024-12-310001879016us-gaap:IntersegmentEliminationMemberie:SantaCruzCopperProjectSegmentMember2024-01-012024-12-310001879016us-gaap:IntersegmentEliminationMemberie:CriticalMetalsSegmentMember2024-01-012024-12-310001879016us-gaap:IntersegmentEliminationMemberie:DataProcessingSegmentMember2024-01-012024-12-310001879016us-gaap:IntersegmentEliminationMemberie:EnergyStorageSegmentMember2024-01-012024-12-310001879016us-gaap:IntersegmentEliminationMember2024-01-012024-12-310001879016us-gaap:OperatingSegmentsMemberie:SantaCruzCopperProjectSegmentMember2024-12-310001879016us-gaap:OperatingSegmentsMemberie:CriticalMetalsSegmentMember2024-12-310001879016us-gaap:OperatingSegmentsMemberie:DataProcessingSegmentMember2024-12-310001879016us-gaap:OperatingSegmentsMemberie:EnergyStorageSegmentMember2024-12-310001879016us-gaap:OperatingSegmentsMember2024-12-310001879016us-gaap:OperatingSegmentsMemberie:SantaCruzCopperProjectSegmentMember2023-01-012023-12-310001879016us-gaap:OperatingSegmentsMemberie:CriticalMetalsSegmentMember2023-01-012023-12-310001879016us-gaap:OperatingSegmentsMemberie:DataProcessingSegmentMember2023-01-012023-12-310001879016us-gaap:OperatingSegmentsMemberie:EnergyStorageSegmentMember2023-01-012023-12-310001879016us-gaap:OperatingSegmentsMember2023-01-012023-12-310001879016us-gaap:IntersegmentEliminationMemberie:SantaCruzCopperProjectSegmentMember2023-01-012023-12-310001879016us-gaap:IntersegmentEliminationMemberie:CriticalMetalsSegmentMember2023-01-012023-12-310001879016us-gaap:IntersegmentEliminationMemberie:DataProcessingSegmentMember2023-01-012023-12-310001879016us-gaap:IntersegmentEliminationMemberie:EnergyStorageSegmentMember2023-01-012023-12-310001879016us-gaap:IntersegmentEliminationMember2023-01-012023-12-310001879016country:CA2025-01-012025-12-310001879016country:CA2024-01-012024-12-310001879016country:CA2023-01-012023-12-310001879016country:CN2025-01-012025-12-310001879016country:CN2024-01-012024-12-310001879016country:CN2023-01-012023-12-310001879016country:US2025-12-310001879016country:US2024-12-310001879016country:CO2025-12-310001879016country:CO2024-12-310001879016country:PE2025-12-310001879016country:PE2024-12-310001879016ie:OtherCountriesExcludingUSAColombiaPeruAndChinaMember2025-12-310001879016ie:OtherCountriesExcludingUSAColombiaPeruAndChinaMember2024-12-310001879016ie:IPulseIncMember2022-10-242022-10-2400018790162025-10-012025-12-31
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 10-K
(Mark One)
| | | | | |
| x | ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the fiscal year ended December 31, 2025
OR
| | | | | |
| o | TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the transition period from to
Commission File Number 001-41436
Ivanhoe Electric Inc.
(Exact name of Registrant as specified in its Charter)
| | | | | |
Delaware | 32-0633823 |
(State or other jurisdiction of incorporation or organization) | (I.R.S. Employer Identification No.) |
| |
450 E Rio Salado Parkway, Suite 130 Tempe, Arizona | 85281 |
(Address of principal executive offices) | (Zip Code) |
| |
Registrant's telephone number, including area code (480) 656-5821
Securities registered pursuant to Section 12(b) of the Act:
| | | | | | | | |
| Title of each class | Trading Symbol(s) | Name of each exchange on which registered |
| Common Stock, par value $0.0001 per share | IE | NYSE American |
Securities registered pursuant to Section 12(g) of the Act: None
Indicate by check mark if the Registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. Yes x No o
Indicate by check mark if the Registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act. Yes o No x
Indicate by check mark whether the Registrant: (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the Registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes x No o
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the Registrant was required to submit such files).Yes x No o
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company” and “emerging growth company” in Rule 12b-2 of the Exchange Act.
| | | | | | | | | | | |
| Large accelerated filer | x | Accelerated filer | o |
Non-accelerated filer | o | Smaller reporting company | o |
| | Emerging growth company | o |
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐
Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report. YES x NO o
If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the financial statements of the registrant included in the filing reflect the correction of an error to previously issued financial statements.☐
Indicate by check mark whether any of those error corrections are restatements that required a recovery analysis of incentive-based compensation received by any of the registrant’s executive officers during the relevant recovery period pursuant to §240.10D-1(b). ☐
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes o No x
The aggregate market value of the voting and non-voting common equity held by non-affiliates of the Registrant, based on the closing price of the shares of common stock on NYSE American as of June 30, 2025 (the last business day of the registrant’s most recently completed second fiscal quarter) was approximately $1.0 billion.
The number of shares of Registrant’s Common Stock outstanding as of February 23, 2026 was 157,422,644.
DOCUMENTS INCORPORATED BY REFERENCE
Portions of the registrant’s definitive proxy statement to be filed within 120 days of December 31, 2025 in connection with its 2026 Annual Meeting of Stockholders are incorporated by reference into Part III, Items 11-14 of this Form 10-K.
Table of Contents
| | | | | | | | |
| | Page |
| Cautionary Note Regarding Forward-Looking Statements | 2 |
| Glossary of Technical Terms | 2 |
| Summary of Risk Factors | 5 |
PART I | | |
| Item 1. Business | 6 |
| Item 1A. Risk Factors | 62 |
| Item 1B. Unresolved Staff Comments | 84 |
| Item 1C. Cybersecurity | 84 |
| Item 2. Properties | 84 |
| Item 3. Legal Proceedings | 84 |
| Item 4. Mine Safety Disclosures | 85 |
| | |
PART II | | |
| Item 5. Market for Registrant's Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities | 86 |
| Item 6. Reserved | 91 |
| Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations | 92 |
| Item 7A. Quantitative and Qualitative Disclosures About Market Risk | 105 |
| Item 8. Financial Statements and Supplementary Data | 106 |
| Item 9. Changes in and Disagreements With Accountants on Accounting and Financial Disclosures | 140 |
| Item 9A. Controls and Procedures | 140 |
| Item 9B. Other Information | 141 |
| Item 9C. Disclosure Regarding Foreign Jurisdictions that Prevent Inspections | 141 |
| | |
PART III | | |
| Item 10. Directors, Executive Officers and Corporate Governance | 142 |
| Item 11. Executive Compensation | 146 |
| Item 12. Security Ownership of Certain Beneficial Owner and Management and Related Stockholder Matters | 146 |
| Item 13. Certain Relationships and Related Transactions, and Director Independence | 147 |
| Item 14. Principal Accounting Fees and Services | 147 |
| | |
PART IV | | |
| Item 15. Exhibits and Financial Statement Schedules | 148 |
| Item 16. Form 10-K Summary | 152 |
Signatures | 153 |
Cautionary Note Regarding Forward-Looking Statements
This Annual Report on Form 10-K (this “Annual Report”) contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, (the "Securities Act"), and Section 21E of the Securities Exchange Act of 1934, as amended, (the "Exchange Act"), that involve risks and uncertainties, including statements based on our current expectations, assumptions, estimates and projections about future events, our business, financial condition, results of operations and prospects, our industry and the regulatory environment in which we operate. Any statements contained herein that are not statements of historical facts are deemed to be forward-looking statements. In some cases, you can identify forward-looking statements by terms such as “anticipate,” “believe,” “could,” “estimate,” “expect,” “intend,” “may,” “plan,” “potential,” “predict,” “project,” “should,” “will,” “would” or the negative of those terms, or other comparable terms intended to identify statements about the future. The forward-looking statements included herein are subject to risks and uncertainties that could cause actual results to differ materially from those expressed in the forward-looking statements. These risks and uncertainties, all of which are difficult or impossible to predict accurately and many of which are beyond our control, include, but are not limited to those made below under “Summary of Risk Factors” and in Item 1A. Risk Factors in this Annual Report.
You should carefully consider these risks, as well as the additional risks described in other documents we file with the Securities and Exchange Commission (“SEC”). We also operate in a very competitive and rapidly changing environment. New risks emerge from time to time and it is not possible for our management to predict all risks, nor can we assess the impact of all factors on our business or the extent to which any factor, or combination of factors, may cause actual results to differ materially from those contained in, or implied by, any forward-looking statements.
The forward-looking statements included herein are based on current expectations of our management based on available information and are believed to be reasonable. In light of the significant risks and uncertainties inherent in the forward-looking statements included in this Annual Report, the inclusion of such information should not be regarded as a representation by us or any other person that such results will be achieved, and readers are cautioned not to place undue reliance on such forward-looking statements, which speak only as of the date hereof. Except as required by law, we undertake no obligation to revise the forward-looking statements contained herein to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events. You should read this Annual Report and the documents we file with the SEC, with the understanding that our actual future results, levels of activity, performance and achievements may be materially different from what we expect, predict or forecast. We qualify all of our forward-looking statements by the cautionary statements referenced above.
Glossary of Technical Terms
Certain terms and abbreviations used in this prospectus are defined below:
“Ag” means the chemical symbol for the element silver.
“Au” means the chemical symbol for the element gold.
“Breccia” is rock composed of broken fragments of minerals or rocks cemented together by a finer grained matrix.
“Concentrate” is the product of a physical concentration process, such as flotation or gravity concentration, which involves separating ore minerals from unwanted waste rock. Concentrates require subsequent processing (such as smelting or leaching) to break down or dissolve the ore minerals and obtain the desired elements, usually metals.
“Cu” means the chemical symbol for the element copper.
“DC/IP” means an induced polarization geophysical survey that uses Direct Current Resistivity to recover conductivity and chargeability distribution.
“Exploration” is prospecting, sampling, mapping, diamond drilling and other work involved in searching for ore.
“Feasibility Study” is a comprehensive technical and economic study of the selected development option for a mineral project, which includes detailed assessments of all applicable Modifying Factors, together with any other relevant operational factors, and detailed financial analysis that are necessary to demonstrate, at the time of reporting, that extraction is economically viable. The results of the study may serve as the basis for a final decision by a proponent or financial institution to proceed with, or finance, the development of the project.
“Grade” means the concentration of metal in a rock sample, usually given as weight percent. Where extremely low concentrations are involved, the concentration may be given in grams per tonne (g/t) or ounces per ton (oz/t) or parts per million (ppm). The grade of a mineral deposit is calculated, often using sophisticated statistical procedures, as an average of the grades of a very large number of samples collected from the deposit. Grade is also used when disclosing the results of drilling activities that have been assayed.
“g/t” means grams per tonne.
“Hypogene” means processes occurring at depth; especially, the primary hydrothermal processes that form a mineral deposit.
“Indicated Mineral Resource” or “Indicated Resource” is that part of a Mineral Resource for which quantity and grade or quality are estimated on the basis of adequate geological evidence and sampling. The level of geological certainty associated with an Indicated Mineral Resource is sufficient to allow a qualified person to apply Modifying Factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Because an Indicated Mineral Resource has a lower level of confidence than the level of confidence of a Measured Mineral Resource, an Indicated Mineral Resource may only be converted to a Probable Mineral Reserve.
“Induced Polarization Geophysical Survey” means a method of ground geophysical surveying employing an electrical current to determine indications of mineralization.
“Inferred Mineral Resources” or “Inferred Resources” is that part of a Mineral Resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. The level of geological uncertainty associated with an Inferred Mineral Resource is too high to apply relevant technical and economic factors likely to influence the prospects of economic extraction in a manner useful for evaluation of economic viability. Because an Inferred Mineral Resource has the lowest level of geological confidence of all Mineral Resources, which prevents the application of the Modifying Factors in a manner useful for evaluation of economic viability, an Inferred Mineral Resource may not be considered when assessing the economic viability of a mining project, and may not be converted to a Mineral Reserve.
“Initial Assessment” is a preliminary technical and economic study of the economic potential of all or parts of mineralization to support the disclosure of Mineral Resources. The Initial Assessment must be prepared by a Qualified Person and must include appropriate assessments of reasonably assumed technical and economic factors, together with any other relevant operational factors, that are necessary to demonstrate at the time of reporting that there are reasonable prospects for economic extraction. An Initial Assessment is required for disclosure of Mineral Resources but cannot be used as the basis for disclosure of Mineral Reserves.
“km” means kilometer.
“km2” means square kilometers.
“kt” means kilotonnes.
“kW” means kilowatts.
“m” means meter.
“m2” means square meters.
“Ma” means mega-annum or million years.
“Measured Mineral Resources” or “Measured Resources” is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of conclusive geological evidence and sampling. The level of geological certainty associated with a measured mineral resource is sufficient to allow a qualified person to apply modifying factors, as defined in this section, in sufficient detail to support detailed mine planning and final evaluation of the economic viability of the deposit.
“Mill” is a processing facility where ore is finely ground and thereafter undergoes physical or chemical treatments to extract the valuable metals.
“Mineral Reserve” is an estimate of tonnage and grade or quality of Indicated and Measured Mineral Resources that, in the opinion of the Qualified Person, can be the basis of an economically viable project. More specifically, it is the economically mineable part of a Measured or Indicated Mineral Resource, which includes diluting materials and allowances for losses that may occur when the material is mined or extracted.
“Mineral Resource” is a concentration or occurrence of material of economic interest in or on the Earth's crust in such form, grade or quality, and quantity that there are reasonable prospects for economic extraction. A Mineral Resource is a reasonable estimate of mineralization, taking into account relevant factors such as cut-off grade, likely mining dimensions, location or continuity, that, with the assumed and justifiable technical and economic conditions, is likely to, in whole or in part, become economically extractable. It is not merely an inventory of all mineralization drilled or sampled.
“Modifying Factors” are the factors that a Qualified Person must apply to Indicated and Measured Mineral Resources and then evaluate in order to establish the economic viability of Mineral Reserves. A Qualified Person must apply and evaluate Modifying Factors to convert Measured and Indicated Mineral Resources to Proven and Probable Mineral Reserves. These factors include, but are not restricted to: mining; processing; metallurgical; infrastructure; economic;
marketing; legal; environmental compliance; plans, negotiations, or agreements with local individuals or groups; and governmental factors. The number, type and specific characteristics of the Modifying Factors applied will necessarily be a function of and depend upon the mineral, mine, property, or project.
“Moz” means million troy ounces.
“Mt” means mega-tonnes or a million tonnes.
“Mtpa” means million tonnes per annum.
“MW” means megawatts or a million watts.
“MWh” means megawatt hours.
“NI 43-101” means National Instrument 43-101 - Standards of Disclosure for Mineral Projects adopted by the Canadian Securities Administrators.
“NSR” means Net Smelter Return, which refers to the proceeds returned from the smelter and/or refinery to the mine owner, taken as the sale price of the metal products less certain transportation, treatment and refining costs.
“Ore” is rock, generally containing metallic or non-metallic minerals and non-ore minerals, that can be mined and processed at a profit.
“Ore Body” is a sufficiently large amount of ore that can be mined economically.
"oz" means troy ounces or 31.1035 grams
“Pb” means the chemical symbol for the element lead.
“Preliminary Feasibility Study”, “Pre-Feasibility Study” or “PFS” means a comprehensive study of a range of options for the technical and economic viability of a mineral project that has advanced to a stage where a Qualified Person has determined (in the case of underground mining) a preferred mining method, or (in the case of surface mining) a pit configuration, and in all cases has determined an effective method of mineral processing and an effective plan to sell the product. A Pre-Feasibility Study includes a financial analysis based on reasonable assumptions, based on appropriate testing, about the Modifying Factors and the evaluation of any other relevant factors that are sufficient for a Qualified Person to determine if all or part of the Indicated and Measured Mineral Resources may be converted to Mineral Reserves at the time of reporting. The financial analysis must have the level of detail necessary to demonstrate, at the time of reporting, that extraction is economically viable. A Pre-Feasibility Study is less comprehensive and results in a lower confidence level than a Feasibility Study. A Pre-Feasibility Study is more comprehensive and results in a higher confidence level than an Initial Assessment.
“Probable Mineral Reserve” is the economically mineable part of an Indicated Mineral Resource, and in some circumstances a Measured Mineral Resource.
“Proven Mineral Reserve” is the economically mineable part of a Measured Mineral Resource and can only result from conversion of a Measured Mineral Resource.
“QA/QC” means quality assurance/quality control.
“Qualified Person” has the meaning ascribed thereto in Subpart 1300 of Regulation S-K.
“Reclamation” is the process by which lands disturbed as a result of mining activity are modified to support beneficial land use. Reclamation activity may include the removal of buildings, equipment, machinery and other physical remnants of mining, closure of tailings, leach pads and other features, and contouring, covering and re-vegetation of waste rock and other disturbed areas.
“Recovery Rate” is a term used in process metallurgy to indicate the proportion of valuable metal physically recovered in the processing of ore. It is generally stated as a percentage of metal recovered compared to the total material originally present.
“Refining” is the final stage of metal production in which impurities are removed from the molten metal.
“Sampling” is a naturally occurring area where metals and elements leached from nearby rocks have accumulated at surface, typically in the form of oxide minerals.
“Smelting” is an intermediate stage metallurgical process in which metal is separated from impurities by using thermal or chemical separation techniques.
“Stringers” are narrow veins or irregular filaments of a mineral or minerals traversing a rock mass.
“Supergene” means a process by which mineralization is enriched by the circulation of groundwater and the weathering process; significant in porphyry-copper and iron oxide-copper-gold deposits, where zones of much higher-grade mineralization may be found.
“Tailings” is the material that remains after all economically and technically recovered precious metals have been removed from the ore during processing.
“t” or “Tonne” means a metric ton or 2,204.6 pounds.
“Ton” means a short ton which is equivalent to 2,000 pounds, unless otherwise specified.
“tpa” means tonnes per annum.
“Trenching” is a long, narrow excavation through overburden to expose a vein, structure, or rock surface.
“Veins” are fissures, faults, or cracks in a rock that are filled by minerals.
“Waste” is rock which is not ore. Waste typically refers to that rock which has to be removed during the normal course of mining in order to get at the ore.
Summary of Risk Factors
We are subject to a number of risks, including risks that may prevent us from achieving our business objectives or that may adversely affect our business, financial condition and results of operations, including the principal risks summarized below:
•Changes in the prices of copper or other metals Ivanhoe Electric Inc. (“Ivanhoe”, “Ivanhoe Electric” or the “Company”) is exploring for.
•The results of exploration and drilling activities and/or the failure of exploration programs or studies to deliver anticipated results or results that would justify and support continued exploration, studies, development or operations.
•The final assessment of exploration results and information that is preliminary.
•We will require substantial capital investment in the future and we may be unable to raise additional capital on favorable terms or at all.
•We have incurred indebtedness and may incur further indebtedness from time to time, which may be secured, including the Deed of Trust in connection with the credit facility we entered into with a banking syndicate comprised of National Bank of Canada, Societe Generale and Bank of Montreal.
•The significant risk and hazards associated with developing and operating any future mining operations, extensive regulation by the U.S. government as well as state and local governments.
•The need to obtain and maintain a variety of permits for mineral exploration and future mining operations.
•Changes in laws, rules or regulations, or their enforcement by applicable authorities.
•The failure of parties to contract with Ivanhoe Electric to perform as agreed.
•The impact of political, economic and other uncertainties associated with operating in foreign countries.
•The impact of health epidemics and other public health threats on the global economy.
In addition to the above summary of principal risks, you should carefully consider the more comprehensive list of risks discussed in this Annual Report under the section titled “Risk Factors.”
Part I
Item 1. Business
Overview
We are a technology-driven United States minerals exploration and development company with a focus on copper and other critical metals vital to electric transmission and generation, manufacturing, infrastructure development, technology, and national security. Our wholly owned assets are located in the United States. We operate exploration joint ventures and alliances in Saudi Arabia, Chile and the United States. We use our powerful Typhoon™ geophysical surveying system, together with advanced data analytics provided by our subsidiary, Computational Geosciences Inc. (“CGI”), to accelerate and de-risk the mineral exploration process in the search for new deposits of critical metals that may otherwise be undetectable by traditional exploration technologies. We believe the United States is significantly underexplored and has the potential to yield major new discoveries of critical metals.
We are committed to the establishment of strong relationships with our local communities and the responsible development of our projects by incorporating best practices for health, safety and environmental standards, water management, protection of local cultural heritage and biodiversity, and minimizing our environmental footprint. We prioritize hiring from local communities.
Our United States Mineral Projects
As of the date of this annual report, we consider our sole material mineral project to be the Santa Cruz Copper Project in Arizona. The Santa Cruz Copper Project is a development project situated in a prolific mining region that hosts some of the largest copper mines in the United States. The Santa Cruz Copper Project encompasses approximately 26.0 square kilometers (~6,425 acres) on private land and includes associated water rights. The Santa Cruz Copper Project location provides excellent infrastructure, including access to rail, interstate highways, and electric transmission lines. On June 23, 2025, we announced the completion of the Preliminary Feasibility Study (the “PFS”) for the Santa Cruz Copper Project. The PFS confirmed the economic viability of an underground copper mining operation combined with a heap leach processing facility utilizing modern technologies and designed to produce copper cathode. The PFS projects that the Santa Cruz Copper Project may produce 1.4 million tonnes of copper cathode over a 23-year mine life. With a base case copper price of $4.25/lb, the Santa Cruz Copper Project has an estimated after-tax net present value of $1.4 billion at an 8% discount rate and an estimated internal rate of return of 20%. The initial project capital estimated in the PFS is $1.24 billion.
Following completion of the PFS for the Santa Cruz Copper Project, we are advancing detailed engineering, operational readiness, and permitting for a copper mining operation incorporating leading technologies to improve efficiencies and costs.
Our other mineral projects in the United States include the Tintic Project located in Utah (the “Tintic Project”), the Hog Heaven Copper-Silver-Gold Project located in Montana (the “Hog Heaven Project”), and the Gleeson Copper-Gold Project in Arizona (“the “Gleeson Project”).
The Tintic Project is an exploration project located 95 kilometers (“km”) south of Salt Lake City in a historically significant silver producing district that also produced significant amounts of copper and gold. We own a majority of the surface land and mineral rights constituting the Tintic Project and we have lease and option agreements in place to own the remaining surface land and mineral rights at the Tintic Project.
The Hog Heaven Project is located on private land approximately 80 km south-southwest of the town of Kalispell, Montana. It is in the historical Flathead Mining District, which consists of several high-sulfidation epithermal mineral deposits and prospects, as well as several historical mines, including the Flathead Mine.
The Gleeson Project is an exploration project located 75 km south-east of Tucson, Arizona in a historic mining district of the same name. We have staked mining claims on federal mineral rights, acquired several Arizona State Mineral Exploration Permits, and signed several option agreements with private landowners.
We also hold a portfolio of other exploration projects in the western United States. These include the BHP Alliance in Arizona, New Mexico, Utah, and Nevada (the “BHP Alliance”), the Bristol Project located in Nevada (the “Bristol Project”), and the Lomitas Negras, Globe-Miami and Perseverance Projects in Arizona (the “Lomitas Negras Project”, “Globe-Miami Projects” and “Perseverance Project”, respectively). The Globe-Miami Project includes the “Sleeping Beauty Project”, “Dragon’s Tail Project” and “Copper King Project”.
Map: United States Mineral Projects
Exploration Alliance with BHP Mineral Resources
In 2024, we established an exploration alliance (“Exploration Alliance”) with a subsidiary of BHP Group Limited (“BHP”) to search for critical minerals in the United States. The Exploration Alliance Agreement sets out the framework for us (acting through a wholly owned subsidiary) and BHP to explore mutually agreed “Areas of Interest” (“AOIs”) in the United States to identify projects within those AOIs that may become 50/50 owned joint ventures. The initial AOIs are in Arizona, New Mexico, and Utah. The Exploration Alliance is for a term of three years, which may be extended. BHP (through a wholly owned subsidiary) agreed to provide initial funding of $15 million, and any subsequent funding would be on a 50/50 basis. We have provided the Exploration Alliance with access to one of our new generation Typhoon™ units, as well as the machine learning algorithmic software and data inversion services of CGI. In April 2025, the Exploration Alliance completed its first survey using a Typhoon™ geophysical survey system at an AOI in Arizona. The first drilling commenced in this area of interest in October 2025.
Maaden Ivanhoe Electric Exploration and Development Limited Company
In 2023, we established an exploration joint venture (the “Joint Venture”) with the Saudi Arabian Mining Company (“Maaden”). The Joint Venture is owned 50/50 by Ivanhoe and Maaden and has an initial term of five years, which may be extended up to 10 years upon mutual agreement of the parties. The Joint Venture operates through a limited liability company established under Saudi Arabian law named Maaden Ivanhoe Electric Exploration and Development Limited Company (“Saudi JVCo”). Maaden has currently made available approximately 50,000 km2 of land under an exploration license (or license application) within Saudi Arabia for exploration by the Joint Venture, a portion of which is expected to be reduced in 2026 following completion of exploration activities. We initially contributed $66.4 million of the proceeds from the sale of our common shares to Maaden to initially fund Saudi JVCo and the Joint Venture, and we provided Saudi JVCo with a royalty-free license to use Typhoon™ within Saudi Arabia for mineral exploration. The license will remain exclusive to the Joint Venture in Saudi Arabia and effective during the term of the Joint Venture. Saudi JVCo purchased three new generation Typhoon™ units from the Company’s former parent, I-Pulse, all of which have been delivered to the Joint Venture and are active in Saudi Arabia. The Joint Venture also entered into a services agreement with Computational Geosciences Inc. (“CGI”), our 94.3% owned subsidiary, pursuant to which CGI is responsible for the supply of the services for the analysis of data and processing of the full spectrum of geophysical datasets produced by the Typhoon™ geophysical survey systems. The Joint Venture commenced exploration activities in November 2023 and announced its first mineral
discovery at Al Amar in January 2025. The Joint Venture is currently conducting drilling activities in the Wadi Bidah area with drilling at other exploration areas planned for later in 2026.
Exploration Collaboration with Sociedad Química y Minera de Chile
On January 27, 2026, we entered into an exploration collaboration (the “Collaboration”) with Sociedad Química y Minera de Chile (“SQM”) to explore for copper in northern Chile. SQM is one of Chile’s largest and oldest mining companies and with one of the largest portfolios of mining concessions in the country. The Collaboration establishes the framework for us and SQM to explore certain of SQM’s mining concessions, comprising a total of 2,002 km2 in northern Chile in areas of Caliche cover in the Atacama Desert. Caliche is a surface deposit of sediments cemented by salts, making it highly electrically resistive and impeding the penetration of low-power geophysical transmitters and their ability to detect underlying sulfide mineralization. Our Typhoon™ geophysical survey system generates a powerful, clean electrical charge that can penetrate the highly resistive Caliche cover to detect potential copper deposits beneath. The Collaboration will be funded by SQM with an initial commitment of $9 million. We are not required to provide any funding prior to the formation of a 50/50 joint venture. Upon identifying a qualifying copper deposit, we will have the option to acquire a 50% interest in the deposit and form a 50/50 joint venture with SQM by paying a price equal to twice SQM’s exploration expenditures to date. The exercise price will be paid to a new joint venture company and used for further exploration and other related activities. Upon the formation of a joint venture, SQM will contribute the relevant mining concessions and associated exploration data. Thereafter, the joint venture will be funded pro rata by us and SQM. A “qualifying copper deposit” is any deposit with the potential for at least one million tonnes of contained copper or copper equivalent, as determined by an independent geologist. The Collaboration has an initial term of three years.
Other International Mineral Projects
Our other mineral projects outside of the United States are the Alacrán Project in Colombia (the “Alacrán Copper Project”) (owned through our approximate 60.8% interest in publicly traded company Cordoba Minerals Corp. (“Cordoba”)), the Ivory Coast Project (owned through our interest in publicly traded company Sama Resources Inc. and our 60.0% interest in a joint venture entity) in Ivory Coast, and the Pinaya Project in Peru. On May 8, 2025, Cordoba announced that it had entered into an agreement for the sale of the remaining 50% of the Alacrán Copper Project to a consortium of investors including JCHX Mining Management Co., Ltd. (“JCHX”), a 19.2% shareholder of Cordoba, for up to $128 million consisting of $88 million in cash on closing, $12 million in a deferred payment, and up to $28 million in a contingent payment. Cordoba shareholders approved the transaction at a meeting of shareholders held on September 15, 2025. On February 10, 2026, the agreement was amended to, among other things, provide for the full $128 million purchase price to be paid at closing and remove any post-closing payments, waive the closing condition of an Environmental Impact Assessment, add a new closing condition of JCHX shareholder approval, and extend the outside date to March 10, 2026. Cordoba has also agreed to use commercially reasonable efforts to distribute to its shareholders the net proceeds after satisfying all liabilities and obligations, subject to required approvals, such that $10 million will remain in Cordoba.
Typhoon and Computational Geosciences
In addition to our portfolio of mineral projects, we own, through a wholly-owned subsidiary, patents to a proprietary exploration technology known as Typhoon™. We also own a 94.3% controlling interest in a data inversion business, CGI. CGI was founded in 2010 to commercialize innovative technology developed at the University of British Columbia, Canada to improve and enhance mineral exploration.
The Typhoon™ technology allows us to cost effectively and efficiently generate geophysical models of large-scale mineral deposits to depths of up to one and a half kilometers or more. CGI software technology consists of sophisticated codes to process geophysical data and build three-dimensional (“3D”) subsurface models that could indicate the presence of various sulfide metals and minerals. Typhoon™ is capable of energizing large volumes of rock to complete larger surveys through a combination of high voltage up to 10 kV, high power up to 100 kW and high current up to 200 amps. Typhoon™ can and has been used successfully to accelerate and de-risk the exploration process, enabling a higher frequency of mineral discovery and lowering total exploration costs. Typhoon™ has proven to be an important exploration tool during its deployment at our exploration projects.
Map: Current and historical deployment of Typhoon™ 
VRB Energy
We also have interests in grid scale energy storage technology utilizing vanadium redox flow batteries. We own a 90.0% interest in VRB Energy Inc. (“VRB Energy”), which itself owns 100% of VRB Energy USA Inc. (“VRB USA”), an Arizona-based developer of advanced grid-scale energy storage systems utilizing vanadium redox flow batteries for integration with renewable power sources. VRB Energy also has a 49% interest in VRB Energy System (Beijing) Co., Ltd, a joint venture in China (“VRB China Joint Venture”) with a subsidiary of privately held Shanxi Red Sun Co., Ltd. (“Red Sun”), which owns 51% of the VRB China Joint Venture. The VRB China Joint Venture manufactures, develops and sells vanadium redox flow batteries for Asian, African and Middle Eastern markets.
Mineral Projects
Our portfolio of highly prospective mineral projects is predominantly focused on copper and other metals vital to advanced manufacturing, infrastructure development, technology, and national security.
The Santa Cruz, Tintic and Hog Heaven Projects are situated in the high-quality copper producing jurisdictions of Arizona, Utah and Montana, respectively. According to the Fraser Institute’s Annual Survey of Mining Companies, Arizona, Utah and Montana rank as some of the most attractive copper mining investment jurisdictions compared to other major copper mining jurisdictions around the world.
___________
Source: Fraser Institute 2024 Investment Attractiveness
Quality Assurance/Quality Control Throughout all of our properties, internal controls, including quality assurance and quality control (“QA/QC”) measures, are in place to ensure the reliability and trustworthiness of our exploration data and mineral resource and reserve estimates. Because mineral resource and reserve estimates depend on geological interpretation and statistical inferences or assumptions drawn from drilling and sampling analysis, there is a degree of uncertainty attributable to those estimates. These measures include written standard operating procedures and independent verifications of aspects such as drilling, surveying, sampling, assaying, data management, and database integrity. Appropriate documentation of QC measures and regular analysis of QC data is essential as a safeguard for project data and form the basis for the QA program implemented during exploration.
Analytical QC measures involve internal and external laboratory procedures implemented to monitor the precision and accuracy of the sample preparation and assay data. These measures are also important to identify potential sample sequencing errors and to monitor for contamination of samples.
We submit a blank, standard, or duplicate sample on every seventh sample. Sampling and analytical QA/QC protocols typically involve taking duplicate samples and inserting QC samples (certified reference material (CRM) and blanks) to monitor the assay results' reliability throughout the drill program.
Samples are securely shipped to reputable analytical laboratories with global quality management systems that meets all requirements of the international standards ISO/IEC 17025:2017 and ISO 9001:2015. The independent labs that we use have robust internal QA/QC program to monitor and ensure quality of assay and other analytical results.
United States
Santa Cruz Copper Project, Arizona, USA (the “Santa Cruz Project”)
References to the “Santa Cruz Copper Project Preliminary Feasibility Study” or “PFS” is to the “S-K 1300 Preliminary Feasibility Study & Technical Report Summary, Santa Cruz Copper Project, Arizona”, dated June 23, 2025 and current as of December 31, 2025. The PFS was prepared in accordance with the Securities and Exchange Commission S-K regulations (Title 17, Part 229, Items 601 and 1300 through 1305) by the following third-party qualified persons: Fluor Canada Ltd., BBA USA Inc. (“BBA”), Burns & McDonnell Engineering Company, Inc., Geosyntec Consultants, Inc., Haley & Aldrich, Inc., INTERA Incorporated, KCB Consultants Ltd., Life Cycle Geo, LLC, Met Engineering, LLC, Paterson & Cooke USA, Ltd., Stantec Consulting Services Inc., and Tetra Tech, Inc. None of the qualified persons is affiliated with the Company or any other entity that has an ownership, royalty, or other interest in the Santa Cruz Copper Project. The PFS and Technical Report Summary on the Santa Cruz Copper Project is included as Exhibit 96.1 hereto. Scientific and technical information in this section is based upon, or in some cases extracted from, the PFS.
Location, Infrastructure, and Access. Our development stage Santa Cruz Copper Project is located in Pinal County, Arizona, 11 km to the west of Casa Grande and approximately a one-hour drive, on paved roads, south of Phoenix. The Santa Cruz Copper Project and exploration areas encompass approximately 75.66 km2 of land. Santa Cruz was discovered in the 1970s but was undeveloped due to market conditions as well as fragmented title and ownership. The Santa Cruz Copper Project centroid is approximately -111.88212, 32.89319 (WGS84) in Township 6 S, Range 4E, Section 13, Quarter C.
Map: Location of the Santa Cruz Copper Project within the state of Arizona.
Title. The Santa Cruz Copper Project is 100% owned by Ivanhoe Electric through its wholly-owned subsidiary, Mesa Cobre Holding Corporation (“Mesa Cobre”).
In 2021, Ivanhoe Electric acquired 238 unpatented mining lode claims from Central Arizona Resources, LLC (“CAR”). In addition, Ivanhoe Electric acquired fee simple mineral title for two further land parcels: “CG100” and “Skull Valley”. In 2022, Ivanhoe Electric acquired the 0.08 km2 (20-acre) “Skull Valley” property from Skull Valley Capital, LLC in the southeastern area of the project and the 0.41 km2 (100.33-acre) “CG100” from CG 100 Land Partners LLC in the northeastern area of the project.
In 2023, Ivanhoe Electric acquired 16 Arizona State Land Department mineral exploration permits covering 27.95 km2 (~6,900 acres) of state mineral land. In 2024, Ivanhoe Electric exercised the agreement with D.R. Horton Phoenix East Construction, Inc. (DRH), granting Ivanhoe Electric, through Mesa Cobre, 100% of the mineral title for 26.0 km2 (~6,425 acres) of fee simple mineral estate, 39 federal unpatented mining lode claims (bringing the total claims controlled by Ivanhoe Electric to 277).
The total project area comprises fee simple land along with unpatented mining lode claims and Arizona State Land Department Mineral Exploration Permits. Annual renewal fees for the unpatented mining lode claims and mineral exploration permits have been made as required. The estimated annual cost of future payments to retain the unpatented mining claims is $55,400. The area of proposed mine activity lies on fee simple land. Mineral control is summarized in the table and figures below.
| | | | | |
| Land Designation | Area (km2) |
| Fee Simple Mineral Ownership | 25.98 |
Unpatented Mining Lode Claims (277 claims) | 25.92 |
| Arizona State Land Department Mineral Exploration Permits (16 permits) | 30.47 |
Map: Ivanhoe Electric Mineral Rights of the Santa Cruz Copper Project.
In 2022, Ivanhoe Electric acquired the surface rights to two land parcels: the 0.08 km2 (20-acre) Skull Valley property from Skull Valley Capital, LLC in the southeastern area of the project and a 0.41 km2 (100.33-acre) land parcel “CG100” from CG 100 Land Partners LLC in the northeastern area of project. In August 2024, Ivanhoe Electric acquired the surface title to three 0.04 km2 (10-acre) parcels located in various areas of the project along with the mineral rights from DRH. The majority of the surface rights for the Santa Cruz Copper Project were acquired in 2023. Surface rights are shown in the Figure below. Ivanhoe Electric acquired grandfathered irrigation rights and grandfathered Type 1 non-irrigation water rights in association with the private land purchased in 2023 and holds all necessary water rights for the life-of-mine plan envisaged in the PFS.
Map: Ivanhoe Electric Surface Rights of the Santa Cruz Copper Project.
There are nine royalty owners for the Santa Cruz, East Ridge, and Texaco deposits, as summarized in the table below. Each royalty has its own distinct property description as shown in the map below.
Table: Royalty Descriptions.
| | | | | |
| Royalty Owner | Royalty Description |
| Royalty Owner A | 10% of 1/800th of the fair market value for refined copper, which amount is set by the value listed in the successor index to Metals Week as of the date the solution extraction / electrowinning (SX/EW) process is completed |
| Royalty Owner B | 60% of 1/800th of the fair market value for refined copper, which amount is set by the value listed in the successor index to Metals Week as of the date the SX/EW process is completed |
| Royalty Owner C | 2% net smelter return |
| Royalty Owner D | 0.15% net smelter return |
| Royalty Owner E | ½ of 1% net smelter return or ½ of 1% of 60% net smelter return if product is disposed of other than to a commercial smelter |
| Royalty Owner F | 10% net smelter return (capped at $7 million) |
| Royalty Owner G | 5% net smelter return |
| Royalty Owner H | 1% net smelter return |
| Royalty Owner I | $0.015/lbs of copper of additional mineable reserve copper over 2 billion pounds (Blbs) as determined by the “Definitive Feasibility Study” or by production beyond the amount estimated in the “Definitive Feasibility Study”; the royalty owner has the option to require payment in Ivanhoe Electric common stock at a 10% discount to the five-day volume weighted average price |
Map: Extent of Royalties
History. Copper mineralization, first discovered in the region in the 1960s by geologists from the American Smelting and Refining Company (“ASARCO”), led to extensive drill programs across the project area.
ASARCO conducted exploration efforts across the Casa Grande Valley and in 1964 the first hole was drilled on what is now the Santa Cruz Project. By May 1965, seventeen drill holes were completed without similar success, and ASARCO reduced its land position. Subsequent reviews in 1970-1971 deemed the Santa Cruz Project worth renewed exploration activity. Following the initiation of the Santa Cruz Joint Venture (“SCJV”) between ASARCO Santa Cruz, Inc. and Freeport McMoRan Copper & Gold Inc. in 1974, additional ground was acquired around the Santa Cruz North deposit. By this time, various joint ventures, as noted below, had staked considerable ground over and around what would eventually be the Casa Grande West (now Santa Cruz) deposit.
In 1973, David Lowell put together an exploration program called the Covered Area Project (“CAP”) that was funded first by Newmont Mining, then, in succession, by a joint venture between Newmont and Hanna Mining, then Hanna with Getty Oil Corp. and Quintana Corp.; though both Quintana and Newmont would pull out of the project before any discoveries were made. By 1974 over 120 holes were drilled at 20 projects across Southwestern Arizona, with a focus on the Santa Cruz system. Drilling under the CAP program continued through to 1977, at which point Hanna Mining took over as operator under a joint venture with operation funding from Getty Oil Corp. Between 1977 and 1982, Hanna-Getty advanced a tight spaced drill program that delineated an estimated 500 Mt of 1% Cu at Casa Grande West, and countless exploration holes in the surrounding Casa Grande Valley.
In 1986, the Bureau of Mines obtained Congressional approval and funding to study in situ copper mining. In 1988, the Santa Cruz deposit was selected for this research project sponsored by a joint venture program between landowners ASARCO Santa Cruz Inc. and Freeport McMoRan Copper & Gold Inc., and the US Department of the Interior, Bureau of Reclamation. The in-situ testing began in February 1996, but research funding was halted in October 1997 due to a change from Congress.
Ivanhoe Electric gained access to the land in August 2021 to start drill programs, completed a mineral resource estimate in 2022, an updated mineral resource estimate in early 2023, an initial assessment in September 2023, and a PFS in June 2025.
Property Condition and Stage of Development. The Santa Cruz Copper Project is a development stage project. No mining activity has taken place on the land constituting the Santa Cruz Copper Project. There is no mine in production at the Santa Cruz Copper Project. There is currently no significant equipment, infrastructure or facilities at the Santa Cruz Copper Project, and no mine development or operating equipment at the project site.
Existing and past land uses in the Santa Cruz Copper Project area and immediately surrounding areas include agriculture, residential home development, light industrial facilities, and mineral exploration and development. Some dispersed recreation occurs in the area. The climate is dry, and most of the Santa Cruz Copper Project area is flat, sandy, and sparsely vegetated. Portions of the Santa Cruz Copper Project area are in the 100-year flood plain. Within the Santa Cruz Copper Project area, approximately 85 acres of land located 1.2 km north of the intersection of N. Spike Road and W. Clayton Road was used during an in situ leaching project in 1991.
We have a large private land package covering the Santa Cruz Copper Project area and area of known mineralization. The ability to operate on private land has the potential to reduce lengthy permitting timelines that result from federal permitting processes. The primary permits required to authorize the construction and operation of the Santa Cruz Copper Project are detailed below.
Permitting and encumbrances. The primary permits for the project will require state, county, and local authorizations. Several permits have been issued for exploration and construction activities, and additional permits have been submitted for construction activities. The remaining permit applications for construction and operations will be prepared and submitted as sufficient design and engineering information become available. Major federal, state and local permits/plans required for the project are listed in the table below.
Table: Permits Required for the Santa Cruz Copper Project.
| | | | | | | | | | | |
| Jurisdiction | Agency | Permit/Plan Needed & Description | Comment |
| Federal | US Environmental Protection Agency | Resource Conservation and Recovery Act – Hazardous Waste Management | Waste accumulation threshold will determine when hazardous waste ID number (permit) is required. |
| Federal | US Fish and Wildlife Service | Migratory Bird Treaty Act | Ongoing monitoring and implementation of beneficial practices throughout life of project. |
State | Arizona Department of Environmental Quality | Class V Underground Injection Control Permit for paste backfill | Permit by rule or individual permit depending on materials characterization and pre-application discussion with agency. |
| State | Arizona Department of Environmental Quality | Areawide Aquifer Protection Permit | Facility-specific permit for heap leach, spent ore, temporary development rock, and ponds. |
| State | Arizona Department of Environmental Quality | Recycled Water Discharge Permit for redistribution of excess treated water to priority users | For distribution of treated water for third party uses (e.g., irrigated crops). |
| State | Arizona Department of Water Resources | 45-513 – Groundwater Withdrawal Permit | Required to withdraw groundwater for dewatering purposes in an Active Management Area for extraction and processing of minerals. |
| State | Arizona State Mine Inspector | Mined Land Reclamation Plan | Closure plans developed as part of Preliminary Feasibility Study. |
| State | Arizona Department of Transportation | Encroachment Permit for access off Hwy 84 | Traffic impact analysis completed. Engineered improvement designs shall be approved by ADOT prior to issuance of the Encroachment Permit. |
| County | Pinal County Air Quality Control District | Class II Air Quality Permit – determined by quantity of emissions from stationary sources and process emissions | Required for any industrial operation that has the potential to emit 5.5 pounds per day or 1 ton per year of any regulated air pollutant is required to obtain a permit from Pinal County Air Quality. Submitted March 2025 for construction activities and under agency review. |
| County | Pinal County Air Quality Control District | Pinal County Dust Control Permit – West Pinal Non-Attainment | Existing permit will be amended annually. |
| City | City of Casa Grande | Special Flood Hazard Area Development Permit for proposed development within a floodplain | Likely not required as facilities have been designed to avoid development within Special Flood Hazard Areas. |
| City | City of Casa Grande | General Plan Amendment – major amendment to city plan | Required to include mining operations and infrastructure within city limits. Obtained June 17, 2024. |
| City | City of Casa Grande | Planned Area Development Amendment (PAD) – | Required to accommodate industrial use/mining operations in a Planned Area Development zone. Obtained February 3, 2025. |
City | City of Casa Grande | Major Site Plan | Required to accommodate industrial use/mining operations in the approved Planned Area of Development. Obtained January 7, 2026 |
City | City of Casa Grande | Development Plan | Required to accommodate drainage and grading for proposed project facilities approved in the Major Site Plan. |
Geological Setting, Mineralization and Deposit Types. The Santa Cruz Copper Project is situated within the Southwestern Porphyry Copper Belt, which is home to numerous productive copper deposits. Notable examples in Arizona include Mineral Park, Bagdad, Resolution, Miami-Globe, San Manuel-Kalamazoo, Ray, Morenci, Sierrita, Twin Buttes, and the historically significant Sacaton Mine. These deposits are part of the larger physiographical area known as the Basin and Range Province, which covers much of the southwestern United States.
The porphyry copper deposits in the Southwestern Porphyry Copper Belt are the result of igneous activity during the Laramide Orogeny, which occurred between 50 and 80 million years ago. This geological event was driven by the subduction of the Farallon Tectonic Plate beneath the North American Tectonic Plate, resulting in the formation of a magmatic arc and the development of associated porphyry copper systems.
The Project comprises four separate areas along a southwest-northeast corridor. These areas from southwest to northeast are known as the Southwest exploration area, the Santa Cruz deposit, the East Ridge deposit, and the Texaco deposit, all of which represent portions of one or more large porphyry copper systems separated by extensional Basin and Range normal faults. Each area has experienced variable periods of erosion, supergene enrichment, fault displacement, and tilting into their present positions.
Mineralization in the project area is divided into the following:
•Supergene copper oxide mineralization mainly consists of atacamite and chrysocolla, with smaller amounts of cuprous goethite, copper-bearing micas, tenorite, cuprite, copper wad, and native copper.
•Secondary supergene sulfide mineralization is dominantly chalcocite, which replaces hypogene sulfide.
•Primary hypogene sulfide mineralization consists of chalcopyrite and molybdenite hosted within quartz-sulfide stringers, veins, and breccias.
Exploration and Drilling. No exploration was completed in 2025. Sixteen sonic drill holes, totaling 1,055 meters, were completed as part of geotechnical development work for the box cut and decline as part of pre-development activities at the Santa Cruz Project. The below discussion is related to the exploration and drilling activities undertaken for the PFS.
Ivanhoe Electric has completed induced polarization geophysical surveys, including two dimensional, three dimensional, multichannel seismic, reprocessing of proprietary Typhoon™ three-dimensional perpendicular pole dipole induced polarization data, and ambient noise tomography in addition to an active three- dimensional seismic survey across the Santa Cruz and east ridge deposits. The geophysical datasets from these surveys were used to assist with geological interpretation and improved drill targeting.
A comprehensive surface ionic leach sampling program has also been completed across the project to assess in detecting copper mineralization at depth.
Ivanhoe Electric completed 149 infill drillholes totaling approximately 120,000 meters since the 2023 initial assessment to the date of the PFS, bringing the total to 194 drillholes and 156,427 meters of combined drilling for the Project since initiating exploration activity in 2021. Combined with historical drilling, Ivanhoe Electric has data for over 469 drillholes totaling 330,118 meters of combined drilling. The mineral resource and mineral reserve estimates included in the PFS are based on data from 329 drillholes totaling 279,164 meters of combined drilling.
Detailed core logging is performed by Ivanhoe Electric geologists through digital data input into MX Deposit. Data that are logged include lithology, alteration, mineralization, veining, petrophysical data, and geotechnical parameters, such as faults, joints, fractures, hardness, and rock quality (Q-system) parameters. Additional characterization fields such as rock colors, grain sizes, textures, and supergene weathering features were also captured.
Approximately 5,884 density measurements from 210 drillholes were measured for the Santa Cruz, East Ridge, and Texaco deposits.
Quality assurance and quality control for the Ivanhoe Electric drill programs consisted of inserting duplicates, blanks, and certified reference materials (standards) into the sample stream at set sampling intervals. BBA’s review of the data indicated no material issues.
A total of 70 km of geotechnical drillholes consisting of 83 historical and 184 modern drillholes informed geotechnical characterization of the Santa Cruz and East Ridge deposits. Historical drillholes were selected based on availability of rock quality designation data.
The groundwater flow model was calibrated and used to predict the residual passive inflows for the PFS mine plan. The predicted residual passive inflows resulting from the updated model, with mitigation measures of activated colloidal silica and cement grouting applied, indicate that the residual passive inflows for the first 10 years of the mine are at or below 6,000 gallons per minute (gal/min). From Years 11 through 25, the residual passive inflows in the updated model range from approximately 6,500 to 8,000 gal/min.
Data Verification. BBA personnel in the disciplines of geology, mineral resource estimation, mineral reserve estimation, mine planning and mine infrastructure visited the project site in 2024. During the visit, BBA personnel reviewed and verified data acquisition procedures with Ivanhoe Electric personnel, visited active drill sites, and performed several other verification checks to ensure data integrity.
Based on the data made available, BBA considers that a reasonable level of verification has been completed and that no material issues were identified from the programs. BBA’s opinion states that the geological data collection and quality assurance and control procedures used by Ivanhoe Electric are consistent with current industry practices and that the geological database is of suitable quality to support a mineral resource and mineral reserve estimation.
Metallurgical Testwork. Metallurgy and processing test work were directed by Met Engineering, LLC and conducted at McClelland Labs (MLI) in Sparks, Nevada, USA and at Blue Coast Research (BCR) in Parksville, British Columbia, Canada. Metallurgical testwork included the following:
•establishing copper recoveries, based on sequential coppers for chloride-assisted, weak-sulfuric acid, heap leaching of mineralized material at the Santa Cruz Copper Project.
•determining commercial operating parameters for heap leaching mineralized material at the Santa Cruz Copper Project, including salt usage, sulfuric acid usage, ore cure/agglomeration practices, leach cell cycle times for an on/off leach pad design, annual pregnant leach solution grades, and pregnant leach solution flow rate to solvent extraction.
A grade-recovery algorithm was developed based on sequential copper assays. For the life-of-mine processing, this equation produces a weighted average of 92.2% total copper recovery to cathode for leaching a 6-meter lift of ore crushed to 100% passing 9.5 mm for 180 days of irrigation utilizing an on/off leach pad.
There are no deleterious elements or factors that could have a significant effect on economic extraction of the copper in the mineralized material.
Mineral Resource Estimate. The mineral resources in this estimate were independently prepared, including estimation and classification, by BBA in accordance with the definition for mineral resources in S-K 1300 regulations. The in-situ mineral resource estimates for the Santa Cruz, East Ridge, and Texaco deposits, inclusive and exclusive of reserves, are presented in the tables below.
The Santa Cruz deposit has approximately 194,000 meters of drilling in 226 drillholes; East Ridge has approximately 49,000 meters of drilling in 62 holes; and Texaco has approximately 36,000 meters of drilling in 41 holes.
Geological domains were developed for the project based on alteration, lithological, and mineralogical characteristics, incorporating regional and local structural information. Normal faults separate the mineralization at the Santa Cruz, East Ridge, and Texaco deposits.
The Santa Cruz deposit was divided into several mineral domains: exotic domain, verde domain, leach cap, oxide domain, chalcocite enriched domain, and primary mineralization domain. The East Ridge deposit consists of a mix of oxide and chalcocite enriched domains. The Texaco deposit consists of all domains except for leach cap and exotic. The domains were further divided into subdomains based on individual grade profiles, which align with controls on mineralization. The following terms are assigned to the subdomains; these represent a local definition of the grade profile: high-grade, medium-grade, and low-grade.
Exploratory data analysis was conducted to determine the nature of element distribution and correlation of grades within individual lithological units, and to identify high-grade outlier samples. Capping was not applied to copper values as significant outliers were not identified. Samples were composited to 2-meter intervals. Variograms were completed by subdomain for each deposit.
The resource estimation methodology constrains the mineralization by using hard wireframe boundaries. Ordinary kriging was employed for the Santa Cruz deposit, and inverse distance squared was selected for the East Ridge and Texaco
deposits. Multiple search passes were used for each deposit. Search parameters were based on variography and continuity of mineralization.
Validation checks were completed on the mineral resource estimates. These included visual comparison of estimated grade to composite grade, domain conformity, swath plots, and comparisons to alternate estimation methods.
Indicated and inferred classification was applied to the Santa Cruz, East Ridge, and Texaco deposits based on BBA’s review that included geological understanding, continuity of mineralization, data quality, examination of drill spacing, visual comparison, kriging variance, distance to the nearest composite, and search pass, along with the search ellipsoid ranges. Collectively, this information was used to produce an initial classification script followed by manual wireframe application to further limit the mineral resource classification.
Mineral resources used commodity prices based on long-term analyst and bank forecasts. In the opinion of BBA, this price is generally aligned with pricing over the last one, three, and five years; forward-looking pricing from internationally recognized banks is appropriate for use in a mineral resource estimate. The commodity price considered three-year trailing averages.
Santa Cruz Mineral Resources
Table: In-Situ Mineral Resource Estimate Exclusive of Reserves for Santa Cruz, East Ridge & Texaco Deposits.
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Deposit | | Classification | | Tonnes (kt) | | Total Copper (%) | | Acid Soluble Copper (%) | | Cyanide Leach Copper (%) | | Residual Copper (%) | | Gold (g/t) | | Silver (g/t) | | Contained Copper (kt) | | Total Acid Soluble Copper (kt) | | Total Cyanide Copper (kt) | | Total Residual Copper (kt) | | Contained Gold (koz) | | Contained Silver (koz) | | Contained Copper (Mlbs) |
| Santa Cruz | | Indicated | | 178,451 | | 0.80 | | 0.34 | | 0.20 | | 0.27 | | 0.024 | | 1.43 | | 1,435 | | 607 | | 359 | | 477 | | 139 | | 8,211 | | 3,163 |
| Inferred | | 31,998 | | 0.73 | | 0.21 | | 0.17 | | 0.34 | | 0.021 | | 1.78 | | 232 | | 68 | | 54 | | 110 | | 21 | | 1,832 | | 512 |
| East Ridge | | Indicated | | 4,407 | | 0.94 | | 0.43 | | 0.31 | | 0.20 | | 0.015 | | 0.71 | | 41 | | 19 | | 14 | | 9 | | 2 | | 101 | | 91 |
| Inferred | | 48,676 | | 0.89 | | 0.44 | | 0.12 | | 0.33 | | 0.006 | | 0.40 | | 436 | | 216 | | 57 | | 163 | | 9 | | 623 | | 960 |
| Texaco | | Inferred | | 341,345 | | 0.78 | | 0.06 | | 0.27 | | 0.45 | | 0.028 | | 0.81 | | 2,664 | | 218 | | 920 | | 1,537 | | 302 | | 8,850 | | 5,873 |
| All Deposits | | Indicated | | 182,859 | | 0.81 | | 0.34 | | 0.20 | | 0.27 | | 0.024 | | 1.41 | | 1,476 | | 625 | | 373 | | 486 | | 141 | | 8,312 | | 3,254 |
| Inferred | | 422,020 | | 0.79 | | 0.12 | | 0.24 | | 0.43 | | 0.025 | | 0.83 | | 3,332 | | 503 | | 1,030 | | 1,809 | | 333 | | 11,304 | | 7,346 |
Notes on mineral resources: 1. The mineral resources in this estimate were independently prepared, including estimation and classification, by BBA USA Inc., and are reported in accordance with the definition for mineral resources in S-K 1300. 2. Mineral resources that are not mineral reserves do not have demonstrated economic viability. 3. Mineral resources are reported in situ, exclusive of mineral reserves. 4. The mineral resources for Santa Cruz, East Ridge, and Texaco deposit were completed using Datamine Studio RM software. 5. The mineral resources are current at December 31, 2025. 6. Mineral resources constrained assuming underground mining methods for the Santa Cruz deposit are reported at an NSR cutoff of US$32.00 for heap leach and US$34.00 for concentrator; Texaco deposit is reported at a NSR cutoff of US$32.00 for heap leach and US$34.00 for concentrator; and East Ridge deposit is reported at a NSR cutoff of US$40.00 for longhole stoping and US$50.00 for drift and fill. The cutoff reflects the total operating costs to define reasonable prospects for economic extraction by conventional underground mining methods. Material from within mineable shape-optimized wireframes has been included in the mineral resource. Underground mineable shapes optimization parameters include a long-term copper price of US$4.00/lb, gold price of US$1,900/oz, and silver price of US$24.00/oz. Process costs of US$7.00 to US$9.00 per processed tonne; direct mining costs between US$22.00 to US$40.00 per processed tonne reflecting various mining method costs (leach, long hole or drift and fill), mining general and administration costs of US$2.63 per processed tonne, onsite processing costs between US$31.63 to US$49.63 per processed tonne, along with variable royalties between 5.01% to 6.96% NSR, and a mining recovery of 100%. 7. Mineral resources are estimated using metallurgical recoveries for heap leach of 96% for acid soluble copper, 83% for cyanide soluble copper, 22% for residual copper, 0% for gold and 0% for silver. Recoveries for concentrator are 0% for acid soluble copper, 90% for cyanide soluble copper, 90% for residual copper, 59% for gold, and 69% for silver. 8. Density was applied using weighted averages by deposit subdomain. 9. Rounding as required by reporting guidelines may result in apparent summation differences between tonnes, grade, and contained metal content.
Table: In-Situ Mineral Resource Estimate Inclusive of Reserves for Santa Cruz, East Ridge & Texaco Deposits.
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Deposit | | Classification | | Tonnes (kt) | | Total Copper (%) | | Acid Soluble Copper (%) | | Cyanide Leach Copper (%) | | Residual Copper (%) | | Gold (g/t) | | Silver (g/t) | | Contained Copper (kt) | | Total Acid Soluble Copper (kt) | | Total Cyanide Copper (kt) | | Total Residual Copper (kt) | | Contained Gold (koz) | | Contained Silver (koz) | | Contained Copper (Mlbs) |
| Santa Cruz | | Indicated | | 317,709 | | 0.95 | | 0.48 | | 0.30 | | 0.17 | | 0.027 | | 1.62 | | 3,017 | | 1,517 | | 956 | | 543 | | 279 | | 16,513 | | 6,650 |
| Inferred | | 31,998 | | 0.73 | | 0.21 | | 0.17 | | 0.34 | | 0.021 | | 1.78 | | 232 | | 68 | | 54 | | 110 | | 21 | | 1,832 | | 512 |
| East Ridge | | Indicated | | 8,742 | | 1.00 | | 0.45 | | 0.39 | | 0.16 | | 0.014 | | 0.68 | | 88 | | 40 | | 34 | | 14 | | 4 | | 191 | | 193 |
| Inferred | | 48,676 | | 0.89 | | 0.44 | | 0.12 | | 0.33 | | 0.006 | | 0.40 | | 436 | | 216 | | 57 | | 163 | | 9 | | 623 | | 960 |
| Texaco | | Inferred | | 341,345 | | 0.78 | | 0.06 | | 0.27 | | 0.45 | | 0.028 | | 0.81 | | 2,664 | | 218 | | 920 | | 1,537 | | 302 | | 8,850 | | 5,873 |
| All Deposits | | Indicated | | 326,450 | | 0.95 | | 0.48 | | 0.30 | | 0.17 | | 0.027 | | 1.59 | | 3,104 | | 1,557 | | 989 | | 558 | | 283 | | 16,704 | | 6,844 |
| Inferred | | 422,020 | | 0.79 | | 0.12 | | 0.24 | | 0.43 | | 0.025 | | 0.83 | | 3,332 | | 503 | | 1,030 | | 1,809 | | 333 | | 11,304 | | 7,346 |
Notes on mineral resources: 1. The mineral resources in this estimate were independently prepared, including estimation and classification, by BBA USA Inc., and are reported in accordance with the definition for mineral resources in S-K 1300. 2. Mineral resources that are not mineral reserves do not have demonstrated economic viability. 3. Mineral resources are reported in situ, inclusive of mineral reserves. 4. The mineral resources for Santa Cruz, East Ridge, and Texaco deposit were completed using Datamine Studio RM software. 5. The mineral resources are current at December 31, 2025. 6. Mineral resources constrained assuming underground mining methods for the Santa Cruz deposit are reported at an NSR cutoff of US$32.00 for heap leach and US$34.00 for concentrator; Texaco deposit is reported at a NSR cutoff of US$32.00 for heap leach and US$34.00 for concentrator; and East Ridge deposit is reported at a NSR cutoff of US$40.00 for longhole stoping and US$50.00 for drift and fill. The cutoff reflects the total operating costs to define reasonable prospects for economic extraction by conventional underground mining methods. Material from within mineable shape-optimized wireframes has been included in the mineral resource. Underground mineable shapes optimization parameters include a long-term copper price of US$4.00/lb, gold price of US$1,900/oz, and silver price of US$24.00/oz. Process costs of US$7.00 to US$9.00 per processed tonne; direct mining costs between US$22.00 to US$40.00 per processed tonne reflecting various mining method costs (leach, long hole or drift and fill), mining general and administration costs of US$2.63 per processed tonne, onsite processing costs between US$31.63 to US$49.63 per processed tonne, along with variable royalties between 5.01% to 6.96% NSR, and a mining recovery of 100%. 7. Mineral resources are estimated using metallurgical recoveries for heap leach of 96% for acid soluble copper, 83% for cyanide soluble copper, 22% for residual copper, 0% for gold and 0% for silver. Recoveries for concentrator are 0% for acid soluble copper, 90% for cyanide soluble copper, 90% for residual copper, 59% for gold, and 69% for silver. 8. Density was applied using weighted averages by deposit subdomain. 9. Rounding as required by reporting guidelines may result in apparent summation differences between tonnes, grade, and contained metal content.
Factors That May Affect the Mineral Resource Estimate
Areas of uncertainty that may materially impact the mineral resource estimates are as follows:
•changes to long-term metal price assumptions
•changes to the input values for mining, processing, and general and administrative (G&A) costs to constrain the estimate
•changes to local interpretations of mineralization geometry and continuity of mineralized subdomains
•changes to the density values applied to the mineralized zones
•changes to metallurgical recovery assumptions
•changes in assumptions of marketability of the final product
•variations in geotechnical, hydrogeological, and mining assumptions
•changes to assumptions with an existing agreement or new agreements
•changes to environmental, permitting, and social license assumptions
•logistics of securing and moving adequate services, labor, and supplies could be affected by epidemics, pandemics, and other public health crises, or geopolitical influence.
The table below compares the Santa Cruz mineral resource estimates, exclusive of mineral reserves, as at December 31, 2025 and December 31, 2024, and reports the net difference as a percentage.
Comparison to previous Mineral Resource Estimate
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| December 31, 2024 | December 31, 2025 | Comparison |
| Deposit | Classification | Tonnes (kt) | Contained Copper (kt) | Deposit | Classification | Tonnes (kt) | Total Cu (k tonnes) | Tonnage % Difference | Total Contained Copper % Difference |
| Santa Cruz | Indicated | 223,155 | | 2,759 | | Santa Cruz | Indicated | 178,451 | | 1,435 | | -20 | % | -48 | % |
| East Ridge | — | | — | | East Ridge | 4,407 | | 41 | | — | % | — | % |
| Texaco | 3,560 | | 47 | | Texaco | — | | — | | — | % | — | % |
| Total Indicated | 226,715 | | 2,807 | | Total Indicated | 182,859 | | 1,476 | | -19 | % | -47 | % |
| Santa Cruz | Inferred | 62,709 | | 768 | | Santa Cruz | Inferred | 31,998 | | 232 | | -49 | % | -70 | % |
| East Ridge | 23,978 | | 326 | | East Ridge | 48,676 | | 436 | | 103 | % | 34 | % |
| Texaco | 62,311 | | 753 | | Texaco | 341,345 | | 2,664 | | 448 | % | 254 | % |
| Total Inferred | | 148,998 | | 1,847 | | Total Inferred | | 422,020 | | 3,332 | | 183 | % | 80 | % |
The current resource model iterations have changed significantly when compared to the iterations released in the initial assessment. Factors that have influenced changes in the resource are as follows:
•a portion of the Santa Cruz Indicated resource has been converted to reserves; see Mineral Reserve table;
•change in cut-off grade from IA to PFS due to change in metallurgical process, mining cost, increased copper price from $3.70/lb to $4.00/lb;
•significant addition of new drilling to all three deposits, with expansion drilling at Texaco contributing to overall resource growth;
•change in interpretation of deposits based on new information;
•understanding of structural influence on the deposit;
•discovery of historical data issues in East Ridge.
Mineral Reserve Estimate. Underground mineral reserves were estimated by BBA. Estimates were prepared for the Santa Cruz deposit, a portion of the East Ridge deposit, and the Verde domain located within the Santa Cruz deposit. The primary mining method for both deposits employs longhole stoping without pillars, utilizing a primary and secondary stoping sequence. Additionally, a few small lenses within the East Ridge deposit use a drift-and-fill mining method. Stopes will be backfilled with cemented rockfill and then all stopes will be backfilled after mining with paste backfill for the remainder of the mine life. Indicated mineral resources were converted to probable mineral reserves. Inferred mineral resources were not converted to mineral reserves; however, if inferred mineral resources fell within the mineral reserve designs, they were assumed to have zero grade.
The underground mine approach was designed using zones that were amenable to different mining methods based on geotechnical considerations, access requirements, deposit shape, orientation and grade, and mining depths. Waste or low-grade blocks in the stope shapes were treated as internal dilution. Mine designs were modified by including the capital and operating development needed to access the stopes, and the applicable infrastructure requirements.
Net smelter return (NSR) represents the gross revenue generated from the sale of a refined metal product (in this case, copper cathodes) after deducting all associated off-site costs. For a mine producing copper cathodes via heap leaching and SX/EW, the traditional "smelter" and "refining" charges inherent in concentrate sales are not applicable. Instead, the offsite deductions are specific to the direct sale of cathodes.
The primary metal produced at the Santa Cruz Copper Project is copper. While byproducts of gold and silver are present, the current heap leach SX/EW process does not recover these precious metals. As is common with polymetallic deposits, the cutoff value for mineral reserves is determined and expressed in terms of net smelter return value per tonne.
The NSR is calculated based on unit metal values, utilizing representative smelter contract terms, freight costs, and forecasted metal prices. The metal prices and metallurgical recovery rates used for NSR calculations are summarized in the table below. Operating cost for cutoff value calculations are summarized in the table below. Royalties are factored into each block of the mineral resource and mineral reserve model.
Mineral reserves are assessed using commodity prices derived from long-term forecasts from analysts and banks. According to BBA, this pricing generally reflects the trends observed over the past one, three, and five years, and the forward-looking prices from internationally recognized banks are deemed appropriate for mineral reserve estimates.
Table: NSR parameters.
| | | | | | | | |
| Product | Unit | Value |
| Acid Soluble Copper Recovery | % | 98.8 |
| Cyanide Soluble Copper Recovery | % | 85.4 |
| Residual Copper Recovery | % | 35.1 |
| Recoverable Copper | % | 90.9 |
| Net Recoverable Copper | % | 90.0 |
| Copper Price | $/lb | 4.00 |
Table: Operating costs for cutoff value calculations.
| | | | | | | | | | | | | | |
| Criteria | Unit | Santa Cruz | East Ridge | East Ridge |
| 30 m Longhole | Drift and Fill | 15 m Longhole |
| Leach | Leach | Leach |
| Cathode Split | % | 100.0 | 100.0 | 100.0 |
| Onsite Costs | | | | |
| Mining Costs – Direct | $/t processed | 31.00 | 47.05 | 47.05 |
| Processing Costs | $/t processed | 10.32 | 10.32 | 10.32 |
| G&A | $/t processed | 2.63 | 2.63 | 2.63 |
| Onsite Total | $/t processed | 43.95 | 60.00 | 60.00 |
| Onsite Rounded NSR Breakeven Cutoff | $/t | 44.00 | 60.00 | 60.00 |
Indicated mineral resources were converted to probable mineral reserves. Inferred mineral resources were excluded from the mineral reserve estimate. Mineral reserves for the Santa Cruz Copper Project are estimated for the Santa Cruz deposit and a portion of the East Ridge deposit, as well as the Verde domain within the Santa Cruz deposit.
Mineral reserves are supported by a mine plan, engineering analysis, and modifying factors.
The point of reference for the mineral reserves is the point where the ore is delivered to the processing plant. Mineral reserves are reported on a 100% basis.
The mineral reserve estimate for the Santa Cruz Copper Project is shown in the table below.
Table: Santa Cruz Copper Project Mineral Reserve Estimate.
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Deposit | | Classification | | Tonnes (kt) | | Total Copper (%) | | Acid Soluble Copper (%) | | Cyanide Leach Copper (%) | | Residual Copper (%) | | Contained Copper (kt) | | Total Acid Soluble Cu (kt) | | Total Cyanide Cu (kt) | | Total Residual Cu (kt) |
| Santa Cruz | | Probable | | 132,061 | | 1.08 | | 0.62 | | 0.41 | | 0.05 | | 1,430 | | 820 | | 544 | | 65 |
| East Ridge | | Probable | | 4,112 | | 1.03 | | 0.46 | | 0.44 | | 0.12 | | 42 | | 19 | | 18 | | 5 |
| Total | | Probable | | 136,173 | | 1.08 | | 0.61 | | 0.41 | | 0.05 | | 1,472 | | 839 | | 563 | | 70 |
Notes: 1. The mineral reserves in this estimate are current to December 31, 2025 and were independently prepared, including estimation and classification, by BBA USA Inc. They are reported in accordance with the definitions for mineral reserves in S-K 1300. 2. The point of reference for the estimate is the point of delivery to the process facilities. 3. The mineral reserves for the Santa Cruz and East Ridge deposits were completed using Deswik mining software. Mineral reserves are defined within stope designs that are prescribed by rock mechanics, considering the specific characteristics of deposits, mineral domains, mining methods, and the mining sequence. Transverse longhole stoping is the optimal mining method with uppers and cut & fill methods used where appropriate. Mining will occur in blocks, extracting ore from the bottom upwards, with paste backfill providing ground support to sustain a production rate of 20,000 tonnes per day for the first 15 years of operation. 4. Mineral reserves are estimated at an NSR cutoff value of $43.95/t for longhole stoping and $60/t for longitudinal retreat stopes and drift and fill. The NSR values reflect the discrete metallurgical responses for each mineral reserve block using metallurgical recoveries for heap leach of 96% for acid soluble copper, 83% for cyanide soluble copper, 22% for residual copper. Underground mineable shapes optimization parameters include a long-term copper price of US$4.00/lb. 5. Mineral reserves account for mining loss and dilution. 6. Mineral reserves are a subset of the indicated mineral resource and do not include the inferred mineral resource. 7. Rounding, as required by the guidelines, may result in apparent summation differences between tonnes, grade, and contained metal content.
Factors That May Affect the Mineral Reserve Estimate. Factors that may affect the mineral reserve estimate include the following:
•changes to long-term metal price assumptions
•changes to metallurgical recovery assumptions
•changes to the input assumptions used to derive the mineable shapes applicable to the assumed underground and open pit mining methods used to constrain the estimates
•changes to the forecast dilution and mining recovery assumptions
•changes to the cutoff grades used to constrain the estimates
•variations in geotechnical (including seismicity), hydrogeological, mining, and processing recovery assumptions
•changes to environmental, permitting, and social license assumptions.
Comparison to previous Mineral Reserve Estimate. Mineral Reserves were estimated for the Santa Cruz Copper Project for the first time in 2025. No previous Mineral Reserves are available to compare.
Mining Methods. The Santa Cruz Copper Project is an undeveloped brownfield project where mineral reserves have been identified for two deposits: Santa Cruz and East Ridge.
The Santa Cruz deposit is located approximately 480 to 940 meters below the surface. Based on the deposit geometry and supporting geotechnical data, transverse underground longhole stoping has been selected as the most suitable mining method. Mining will be conducted in blocks, with ore being extracted from the bottom upward within each block while utilizing paste backfill to provide ground support. A sill pillar will be maintained between the blocks. The paste backfill is designed to be strong enough to allow adjacent filled stopes to be mined without requiring additional pillars.
The East Ridge deposit is situated to the northeast of the main Santa Cruz deposit, approximately 310 to 790 meters below the surface. It consists of multiple inclined tabular lenses and will be mined using a hybrid approach that combines longhole stoping and the drift-and-fill method, depending on the geometry of the orebody in each zone, followed by paste backfill and curing before the development of the next adjacent drift in the orebody.
Mine access will be provided through two decline drifts from the surface: one for main access and the other for a Railveyor system to handle materials. Ore will be transported from the stopes by load-haul-dump (LHD) equipment to an ore pass system, which will transfer the ore from a chute to a conveyor system. From the conveyor system, it will be loaded onto the Railveyor and brought to surface.
The Santa Cruz Copper Project encompasses three mining zones: Santa Cruz, Verde, and East Ridge (Figure below). The Santa Cruz zone is the primary production area and is structurally divided into northern and southern regions.
Figure. Mining Zones of Santa Cruz and East Ridge Deposits, View Looking North
The Santa Cruz Copper Project mine life is expected to be 23 years with construction from 2026 to 2028 followed by schedule production to 2051. The table below summarizes the production in the mine plan. The “Ore” column represents the total development and production ore for Santa Cruz, Verde, and East Ridge mining zones.
Table: Santa Cruz Scheduled Production Summary.
| | | | | | | | | | | | | | | | | | | | |
| Year | Ore (kt) | Total Copper (%) | AsCu (%) | CNCu (%) | Cu_Res (%) | Ratio ASCU:TCU |
| 2026 | 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| 2027 | 28 | 0.48 | 0.34 | 0.05 | 0.10 | 0.70 |
| 2028 | 1,673 | 0.71 | 0.51 | 0.15 | 0.05 | 0.71 |
| 2029 | 3,973 | 1.29 | 0.99 | 0.26 | 0.04 | 0.77 |
| 2030 | 5,377 | 1.35 | 0.86 | 0.44 | 0.04 | 0.64 |
| 2031 | 6,737 | 1.15 | 0.61 | 0.51 | 0.04 | 0.53 |
| 2032 | 7,492 | 1.12 | 0.56 | 0.50 | 0.06 | 0.50 |
| 2033 | 7,439 | 1.13 | 0.56 | 0.52 | 0.06 | 0.49 |
| 2034 | 7,875 | 1.02 | 0.64 | 0.35 | 0.03 | 0.63 |
| 2035 | 7,441 | 1.13 | 0.72 | 0.39 | 0.02 | 0.64 |
| 2036 | 7,740 | 1.06 | 0.75 | 0.29 | 0.02 | 0.71 |
| 2037 | 7,937 | 1.01 | 0.58 | 0.38 | 0.05 | 0.57 |
| 2038 | 7,961 | 0.99 | 0.52 | 0.43 | 0.04 | 0.52 |
| 2039 | 7,256 | 1.15 | 0.49 | 0.59 | 0.08 | 0.42 |
| 2040 | 7,400 | 1.14 | 0.53 | 0.53 | 0.07 | 0.46 |
| 2041 | 7,819 | 1.05 | 0.51 | 0.48 | 0.06 | 0.49 |
| 2042 | 7,851 | 1.07 | 0.52 | 0.49 | 0.06 | 0.48 |
| 2043 | 5,956 | 1.07 | 0.68 | 0.34 | 0.05 | 0.64 |
| 2044 | 4,177 | 1.04 | 0.50 | 0.51 | 0.03 | 0.48 |
| 2045 | 3,732 | 1.04 | 0.67 | 0.31 | 0.06 | 0.65 |
| 2046 | 3,338 | 1.05 | 0.67 | 0.31 | 0.06 | 0.64 |
| 2047 | 3,453 | 1.00 | 0.69 | 0.26 | 0.05 | 0.69 |
| 2048 | 3,586 | 1.07 | 0.65 | 0.36 | 0.06 | 0.60 |
| 2049 | 3,655 | 0.99 | 0.52 | 0.41 | 0.06 | 0.53 |
| 2050 | 3,643 | 1.04 | 0.67 | 0.29 | 0.08 | 0.65 |
| 2051 | 2,636 | 0.92 | 0.66 | 0.14 | 0.12 | 0.71 |
| Total | 136,173 | 1.08 | 0.62 | 0.41 | 0.05 | |
The figures below show a tonne-grade graph for production and includes estimated waste rock and tonnes of material mined over the life-of-mine from the orebodies and development, respectively.
Figure. Santa Cruz Tonne – Grade Graph
Figure. Santa Cruz Tonnes of Mined Material
The injection of activated colloidal silica to reduce water inflow within specific areas of underground development was evaluated by Geosyntec for the project. During initial decline development where the twin declines pass through the upper portion of the Gila conglomerate and other high hydraulic conductivity zones, standard ramp dewatering methods—in addition to methods like activated colloidal silica and cement grout injection are utilized to support underground development.
Recovery Methods. Process for the Santa Cruz Copper Project has been designed to cycle oxide and secondary sulfide ores through an on/off heap leach pad to produce a copper-rich pregnant leach solution (PLS) that will be processed in the onsite solvent extraction and electrowinning circuit for recovery.
The process designs were based on existing technologies and proven equipment. The process and refinery plant designs are based on the results of metallurgical testwork on the mineralized material at the Santa Cruz Copper Project. The designs are conventional.
The simplified overall process flow diagram is presented in the Figure below.
Figure. Simplified Process Flowsheet
Run-of-mine ore will be delivered to surface at a diameter of less than 20 cm via the Railveyor. Ore from underground will be either fed, via a surge hopper, to crushing or diverted and conveyed to the coarse ore stockpile for future use. Fine ore (undersize from the crushing circuit) will be trucked to the agglomeration drums where sulfuric acid and sodium chloride can be added to facilitate agglomeration and leaching.
Crushed and agglomerated ore will be delivered to the leach pad via a combination of haul truck and overland conveying and stacking equipment. The final mobile conveyor will feed two self-propelled indexing conveyors in series, which in turn will feed the self-propelled mobile radial stacker. The cells will be ‘retreat’ stacked by the radial stacker in a half-moon shape.
The on/off heap leach pad will be divided into seven cells with spacer strips between the cells effectively creating multiple leach pads and providing safety zones between the cells. The liner for the leach pad is comprised of a high-density polyethylene geomembrane overlaying a geosynthetic layer of clay overlaying prepared native foundation materials or grading fill.
Ore will be stacked at up to 22,000 t/d, and will take approximately 36 days to stack each cell at design production rate. Each of the cells will progress through cycles in sequence with each stacking cycle taking 36 days and an entire cell cycle taking 265 days.
Ore produced from the underground mine will be processed using a heap leach and solvent extraction and electrowinning flowsheet to produce London Metal Exchange grade copper cathode. The heap leaching process will take place on an on/off pad. Spent ore will be removed from the leach pad and processed for paste backfill or stacked on a spent ore pile. Approximately 50% of the spent ore will be processed for use in paste backfill. Operations will be conducted 24 hours per day, 365 days per year for approximately 26 years at a design stacking rate of up to 22,000 t/d.
Figure. Seven-Cell Heap Leach and Solution Management
The solvent extraction circuit design comprises two parallel trains. Each train will consist of two extraction stages, two wash stages, and one strip stage. The copper electrowinning tankhouse will comprise electrowinning cells with lead anodes and stainless-steel cathode blanks. Cathodes (copper electroplated onto stainless steel blanks) will be harvested manually using an overhead crane and bail. Cathodes will be stripped in an industry standard automated stripping machine and the washed blanks will be returned to the cells. Product cathode copper will be bundled, sampled, weighed, labeled, and shipped.
Infrastructure. The Santa Cruz Copper Project site surface infrastructure comprises the following:
•an open excavation 60-meter-deep “box cut” ramp for accessing a twin decline portal to the underground mine workings
•three ventilation shafts to facilitate air flows to the underground mine workings
•primary mine ventilation fans, hardware, and ducting to control ventilation to the underground mine workings
•refrigeration plant to control temperatures in the underground mine workings
•ventilation bore for refrigeration
•rock crushing process plant and temporary stockpiles
•two spent ore facilities; north and south pads
•on/off leach pad with associated collection ponds and mobile stacking
•solution extraction and electrowinning process facilities
•mobile cement batch plant facility
•paste backfill batch facility
•maintenance, and warehouse facilities
•first aid/rescue building
•multiple various ancillary outbuildings
•entry security shack and various visitor and project parking spaces
•equipment delivery and open laydown/storage area
•multiple improved and unimproved access roads
•piping and pumping systems for process and water services
•explosives storage facility
•high-voltage transmission line and substation
•environmental monitoring facilities
•emergency power generation facility
•solar power and battery storage facility.
Key infrastructure locations are shown on the Figure below.
Figure. Santa Cruz Site Plan
Power for the project will be provided from a combination of onsite renewable energy supply and utility grid supply. The goal of the mine development is to achieve a minimum of 70% of the energy supply from renewable sources including onsite photovoltaic solar generation built by a third-party developer in conjunction with a Power Purchase Agreement
(PPA) facilitated by local power provider Electrical District No. 3 (ED3) plus onsite battery energy storage system. The renewables facility was sized based on available area and to provide 40 MW of continuous power annually with over 90% load coverage.
The proposed onsite battery energy storage system consists of a lithium-ion system rated for 140 MW / 560 MWh. There is an additional opportunity to utilize the emerging vanadium redox flow battery technology. A percentage of the lithium-ion battery energy storage system could be replaced by a vanadium redox flow battery system. VRB USA is the holder of vanadium redox battery technology in the United States and is a wholly owned subsidiary of VRB Energy, a subsidiary that is 90%-owned and controlled by Ivanhoe Electric.
The Santa Cruz Copper Project will have an estimated operating load of 78.7 MW and a forecast annual consumption of between 580,000 and 690,000 MWh during peak production years.
Water supply for process operations will be sourced from existing grandfathered Type I non-irrigation rights and mine dewatering. Potable water will be trucked in from the city. Trucked water will be stored in a tank to service the surface facilities. Water management operations include systems of underground dewatering, water collection and conveyance facilities, water storage, water use, and various management options for discharge of excess water. Water not used for underground mining, the paste backfill plant, the process plant, and the on/off heap leach pad can be pumped to storage reservoirs. Rapid infiltration basins are used to capture non-contact stormwater runoff to prevent stormwater from coming into contact with mining operations. Testwork confirmed the extracted groundwater quality will be acceptable for irrigation use when applied to suitable crops (e.g., cotton, alfalfa, pasture grasses) commonly grown in the vicinity of the project. The water distribution system is designed to distribute water to agricultural end-users, without treatment, and includes a side-stream water treatment process that may be used if the extracted groundwater does not meet the standards defined by end-users.
Onsite accommodations facilities are neither required nor planned. Personnel will reside in nearby settlements including Casa Grande, Maricopa, the Phoenix metropolitan area, and Tucson, and will commute to site by vehicle. Parking, security, fencing, and a gatehouse are included in the design. The infrastructure buildings to be built on site include explosive magazine storage; cap magazine storage; core shack; process laboratory; security and main gate; fueling station; mine, plant operations building, changehouse, and mine dry; first aid and emergency rescue facilities; mining facility warehouse.
Market Studies and Contracts. Copper is a globally traded commodity that has established benchmark pricing in the form of exchanges such as the London Metals Exchange or Commodity Exchange Inc. The Santa Cruz Copper Project aims to produce copper cathode. Ivanhoe Electric plans to sell the copper in the United States.
Refined copper cathodes will be sold with reference to the prices on the Commodity Exchange or London Metals Exchange at an agreed-upon quotational period. An additional premium to the price will be negotiated with potential buyers. Factors affecting the premium will include the shape and chemical specification of the cathode, together with the geographical location of the delivery point in relation to where the cathode is going to be consumed.
This study uses a base copper price of $4.25 per pound, which is based on a review of the one-, three-, and five-year trailing averages, as well as consensus forecasts from major banks and a market study completed by Ocean Partners for Ivanhoe Electric.
Due to the shape, chemical composition, and origin point of the cathode, it is expected that a premium to the price will be negotiated with potential buyers that is marginally above the historical average. For financial modeling purposes, this premium is estimated at $0.14 per pound ($300 per tonne) (Ocean Partners, 2025).
The table below summarizes the one-, three-, and five-year trailing price for copper using the LME Grade A monthly average as well as consensus forecasts from the major banks (CIBC, 2025) and Ocean Partners (2025).
Table: Commodity Price Summary.
| | | | | | | | | | | | | | | | | | | | | | | | | | |
| LME Trailing Average ($/lb) | Forecast ($/lb) |
1-Year | 3-Year | 5-Year | 2026 | 2027 | 2028 | 2029 | Long-term |
BBA1 | 4.22 | 3.96 | 3.95 | | | | | |
Banks Forecast2 | | | | 4.36 | 4.52 | 4.65 | | 4.31 |
Ocean Partners3 | | | | 4.31 | 4.54 | 4.76 | 4.65 | 4.31 |
Notes: 1BBA, Metal Pricing_R00, June 2025. 2CIBC Consensus Commodity Prices – June 2025. 3Ocean Partners, April 2025. LME = London Metals Exchange.
At this time, no sales agreements or contracts have been executed with vendors, contractors, or manufacturers.
Environmental, Closure, and Permitting. Environmental studies have included examination of flora and fauna, threatened and endangered species, migratory birds, surface water mapping, cultural heritage, air quality, carbon intensity, surface water monitoring, groundwater monitoring, water quality, material characterization, and mine material environmental behavior.
Much of the property has been previously disturbed from its natural state. These disturbances include flood control features, such as the canal identified as the Santa Cruz Wash Canal, paved and unpaved roads, and agricultural practices. These disturbances have removed all potential natural surface water features that may have existed in this area. The only features within the property that possess characteristics of an ordinary high-water mark and may be potential Waters of the United States are the north branch of the Santa Cruz Wash and the constructed Santa Cruz Wash Canal.
The project is committed to responsible environmental management, with a particular focus on minimizing air quality impacts. The project is located within the West Pinal County PM10 (particulate matter emissions with a diameter less than 10 microns) nonattainment area. Accordingly, the project will take specific measures to control and effectively mitigate dust. These measures will be in alignment with both local and state requirements.
A groundwater monitoring program to continue collecting baseline water quality data was developed and implemented in October 2023. The objective of the monitoring plan is to establish a current baseline water quality profile for the site and help inform Ivanhoe Electric on best management practices for groundwater monitoring during and after mining operations.
The major permits for the project will require state, county, and local authorizations. Several of these permits have been issued for exploration activities and are in the process of being amended for project construction activities. Other permits for construction activities have been submitted and are currently under review by the agency or approved. The remaining permit applications for construction and operations will be prepared and submitted as sufficient design and engineering information become available.
The eventual closure and reclamation of the Santa Cruz Copper Project will be directed and regulated under two separate but interconnected regulatory programs in Arizona: the Arizona State Mine Inspector and the Arizona Department of Environmental Quality. Both programs are well-established and statutes and rules are subject to licensing timeframes.
Once the facility has been sufficiently designed to advance to mine development and operation, Ivanhoe Electric will need to apply for and receive an Areawide Aquifer Protection Permit from the Arizona Department of Environmental Quality and submit and receive approval from the Arizona State Mine Inspector for a mined land reclamation plan detailing the project closure approach. Related closure cost estimates for financial assurance must be submitted following approval and before facility construction and operation.
Although an operational mined land reclamation plan has not yet been developed for the project, a preliminary closure cost estimate has been developed. Based on the conceptual design plan in this report, the closure costs for the Santa Cruz Copper Project are estimated at $35 million.
In alignment with Ivanhoe Electric’s community engagement and partnership standards, the project is being developed with a well-defined strategy to establish and uphold the support of the surrounding communities. At present, the project has initiated outreach with Native American communities that have ancestral ties to the land. In addition, community outreach with local stakeholders, and community involvement and potential partnerships are actively being pursued and/or assessed.
Capital and Operating Cost Estimates
Capital Cost Estimate. For the Santa Cruz Copper Project, capital and operating costs were determined based on the mine plan and SX/EW plant design. The estimation process incorporated assessments of material and labor requirements derived from the design, analysis of the process flowsheet, and anticipated consumption of power and supplies.
Cost estimation is based on a combination of vendor and consumable quotes and an internal database. Approximately 80% of the capital estimate is based on detailed quotes with estimated labor installation. For the purposes of this study, initial capital expenditure is assumed to be costs incurred in 2026, 2027, and 2028. By the end of 2028, ore production from stopes has been established and the SX/EW plant has been installed to begin copper production. Additional mine and
plant capital costs are incurred from 2029 and 2050 to continue meeting mine ramp up and production demands and are included in sustaining capital costs.
Total life-of-mine capital costs are $2.36 billion: $1.24 billion in initial capital and $1.28 billion in sustaining capital. Capital costs are summarized in the table below.
Table: Estimated Capital Costs.
| | | | | | | | | | | |
| Capital Costs Summary | Initial Cost ($M) | Sustaining Cost ($M) | Total LOM Capital Cost ($M) |
| Pre-production Mining Costs | 89 | | | 89 | |
| Mining | 688 | | 1,193 | | 1,881 | |
| Process | 240 | | 65 | | 305 | |
| Surface Infrastructure | 61 | | 8 | | 69 | |
| Indirects | 46 | | 7 | | 53 | |
| EPCM | 64 | | 2 | | 66 | |
| Contingency | 48 | | 5 | | 53 | |
| Total Initial Capital | 1,236 | | | |
| Total Sustaining Capital | | 1,281 | | |
| Reclamation and Closure Costs* | 2 | | -163 | | -161 | |
| Total Life-of-Mine Capital Costs | 1,238 | | 1,118 | | 2,355 | |
Note: Closure costs include land sales at the end of the life of mine. Totals may not sum due to rounding.
Operating Cost Estimate. Total life-of-mine operating costs are $3.95 billion, as summarized in the table below.
Table: Estimated Operating Costs.
| | | | | | | | | | | |
| Category | $M Total | $/t Ore Processed | $/lb Copper Produced |
| Mining | | | |
| Consumables | 1,239 | 9.22 | 0.41 |
| Mobile Equipment | 432 | 3.24 | 0.14 |
| Haulage | 39 | 0.29 | 0.01 |
| Labor | 626 | 4.73 | 0.21 |
| Power | 149 | 1.19 | 0.05 |
| Mine Services and Indirect | 55 | 0.40 | 0.02 |
| Subtotal | 2,538 | 19.07 | 0.85 |
| SX/EW Plant and Infrastructure | | | |
| Consumables | 276 | 2.03 | 0.09 |
| Hauling and Mobile Equipment | 177 | 1.30 | 0.06 |
| Labor | 185 | 1.36 | 0.06 |
| Power | 300 | 2.20 | 0.10 |
| Maintenance | 58 | 0.43 | 0.02 |
| Subtotal | 996 | 7.31 | 0.33 |
| G&A | 414 | 3.04 | 0.14 |
| Total | 3,948 | 29.42 | 1.32 |
Note: Totals may not sum due to rounding.
Economic Analysis. Based on the cash flow model, the after-tax financial model resulted in an IRR of 20.0% and an NPV of $1.4 billion using an 8% discount rate. The after-tax payback period, after start of operations, is 4.4 years. The pre-tax base case financial model resulted in an IRR of 22.0% and an NPV of $1.9 billion using an 8% discount rate. The book value of the Santa Cruz property and its associated plant and equipment as at December 31, 2025 was $177.8 million.
The Santa Cruz Copper Project contemplates average annual copper cathode production of approximately 72,000 tonnes for the first 15 years of copper production and the average annual production is approximately 35,000 tonnes for the remaining 8 years of the life of mine.
The total life of mine is 23 years at an average C1 cash cost of $1.32 per pound of copper and sustaining cash costs of $2.01 per pound of copper.
A variable cut-off grade strategy optimizes recovery in the early years and maximizes mine life in the later years of the mine plan.
The financial analysis summary is shown in the table below.
Table: Estimated Operating Costs.
| | | | | | | | | | | |
| Description | Units | Life of Mine | First 15 Years |
| Production Data |
| Mine Life | years | 23 | 15 |
| Reserve Tonnes | Mt | 136 | 106 |
| Copper Grade | % | 1.08 | 1.10 |
| Daily Throughput | t/d | 15,000 | 20,000 |
| Annual Copper Production | t/y | 56,685 | 72,186 |
| Total Copper Cathode Produced | kt | 1,360 | 1,083 |
| Recovery | % | 92.2 | 92.4 |
| Capital Costs |
| Initial Capital | $M | 1,236 | - |
| Sustaining Capital | $M | 1,281 | 1,176 |
| Unit Costs |
| Mining Cost | $/t processed | 19.07 | 19.55 |
| Processing Cost | $/t processed | 7.31 | 7.02 |
| General and Administrative Cost | $/t processed | 3.04 | 3.03 |
| Royalties | $/t processed | 5.26 | 5.56 |
| Total Operating Cost | $/t processed | 34.68 | 35.16 |
| Operating + Sustaining Cost | $/t processed | 43.98 | 46.23 |
| C1 Cash Cost | $/lb of copper | 1.32 | 1.29 |
| All-in-Sustaining Cost | $/lb of copper | 2.01 | 1.99 |
| Financial Analysis |
| Copper Price | $/lb | 4.25 | 4.25 |
| Domestic Cathode Premium1 | $/lb | 0.14 | 0.14 |
| Pre-Tax Cashflow | $M | 6,148 | 4,501 |
| Pre-Tax Net Present Value (8%) | $M | 1,880 | - |
| Pre-Tax Internal Rate of Return | % | 22.0 | - |
| After-Tax Cashflow | $M | 4,961 | 3,637 |
| After-Tax Net Present Value (8%) | $M | 1,376 | - |
| After-Tax Internal Rate of Return | % | 20.0 | - |
| After-Tax Payback Period | year | 4.4 | |
Risks. The risks associated with the Santa Cruz Copper Project are generally those expected with underground mining operations and include the accuracy of the mineral resource and mineral reserve models, and/or operational impacts.
In addition, the noted factors that may affect the mineral resource and mineral reserve estimates include:
•The capital cost estimates at mines under development may increase as construction progresses. This may negatively affect the economic analysis that supports the mineral reserve estimates.
•The life-of-mine plan assumes that the project can be permitted based on envisaged timelines. If the permitting schedule is delayed, this could impact costs and proposed production.
•The long-term reclamation and mitigation of the Santa Cruz Copper Project are subject to assumptions as to closure timeframes and closure cost estimates. If these cannot be met, there is a risk to the costs and timing.
•Climate changes could impact operating costs and ability to operate.
•Political risk from challenges to the current state or federal mining laws.
Opportunities. Potential opportunities for the project include the following:
•Upgrade of some or all the inferred mineral resources to higher-confidence categories, with additional drilling and supporting studies, such that this higher confidence material could potentially be converted to mineral reserves.
•Optimizing the mine plan based upon market conditions. At present, the production stopes are dictated by their copper content based upon a flat long term copper price.
•Completing additional underground core diamond drilling and development within the ore, there could be a reason to increase the width and/or height of the stopes, if geotechnical factors allow.
•Ivanhoe Electric holds a significant ground package that retains significant exploration potential for new operations proximal to the current mineral resource and mineral reserve estimates, with the support of additional studies.
•Ongoing leach testwork will focus on optimizing leach conditions to maximize copper recovery from chalcocite and reduce heap leach pad capital costs and SX circuit capital costs.
•Simplification and optimization of the ore crushing circuit should provide for an opportunity to reduce plant capital costs.
•Use of two decades of South American knowledge and expertise at applying chloride-assisted leach technology to inform construction of the on/off heap leach pad.
•The low elevation profile of the heap leach pad (6-meter lift on/off pad) and the flat topographic terrain should provide cost saving opportunities to use low head type pumps for pregnant leach solution, raffinate, and organic pumping that can use less expensive materials of construction for pumps like fiberglass, bromo-butyl rubber-lined carbon steel (not applicable for organic) and HDPE compared to exotic metal pumps resistant to this corrosion environment such as tantalum and titanium.
•There is potential for a considerable positive impact to the operating cost estimate by optimizing the paste backfill recipe and reducing the binder requirements.
•There is potential to increase material handling and throughput, further optimizing the mine plan.
Conclusions. Under the assumptions presented in the PFS, the Santa Cruz Copper Project consists of mineral resource and mineral reserve estimates that support a positive cash flow.
Recommendations. The recommended work programs to advance detailed engineering, operational readiness, permitting, and critical long-lead items total $22.4 million. The budget for recommended work is summarized in the table below.
Table: Proposed Reagent & Process Consumables.
| | | | | |
| Discipline | Cost ($M) |
| Permitting | 1.4 |
| Environmental Testing | 1.0 |
| Detailed Engineering – Surface & Underground | 9.1 |
| Long-Lead Items | 3.7 |
| Project Support | 4.2 |
| Contingency | 3.0 |
| Total | 22.4 |
Financing
Ivanhoe Electric’s wholly-owned subsidiary, Mesa Cobre, closed a two year senior secured multi-draw bridge facility of $200 million (the “Bridge Facility”) on December 12, 2025. The Bridge Facility is intended to support the development and construction of the Santa Cruz Copper Project. Outstanding amounts under the Bridge Facility will bear interest at our election, either at (i) the forward-looking term rate based on the Secured Overnight Financing Rate administered by the Federal Reserve Bank of New York (“Term SOFR”) plus a margin of 5.0%, increasing by 0.5% on each of the 6th, 12th, and 18th month following the closing date, or (ii) the alternate base rate defined as the highest of (a) the rate of interest last quoted by The Wall Street Journal as the “prime rate” in the U.S., (b) the federal funds rate plus 0.50%, and (c) one-month Term SOFR plus 1.00%, plus the Applicable ABR Rate (as defined below). Default interest is the applicable rate plus 2.00% per annum. “Applicable ABR Rate” means (i) until (and including) June 30, 2026, 4.00% per annum, (ii) from (but excluding) June 30, 2026 and until (and including) December 31, 2026, 4.50% per annum, (iii) from (but excluding) December 31, 2026 and until (and including) June 30, 2027, 5.00% per annum, and (iv) thereafter, 5.50% per annum. Interest is payable on the last business day of each fiscal quarter, beginning March 31, 2026. Mesa Cobre is permitted to make optional prepayments, and is required to make prepayments equal to the cash proceeds of any new indebtedness (other than permitted indebtedness). Mesa Cobre owes customary agent and arranger fees under fee letters and a commitment fee equal to 25% of the then Applicable SOFR Rate on the unused commitments, payable on each interest payment date.
In connection with the Bridge Facility, (i) Mesa Cobre entered into a security agreement with the Collateral Agent which granted a first priority lien on substantially all of its assets, subject to customary exceptions, (ii) Ivanhoe Electric guaranteed Mesa Cobre’s payment obligations pursuant to a guaranty agreement in favor of the Administrative Agent whereby Ivanhoe Electric agrees to maintain at all times a tangible net worth of not less than $225.0 million, (iii) Ivanhoe Electric pledged its shares of Mesa Cobre pursuant to a pledge agreement between Ivanhoe Electric and the Collateral Agent, and (iv) Mesa Cobre executed a deed of trust and assignment of rents in favor of the Collateral Agent with respect to Mesa Cobre’s real property rights.
Other Properties
At our other U.S. exploration projects, we advanced exploration work programs in 2025. At the Tintic Project, mapping and sampling campaigns were conducted in 2025 to refine precious metal rich replacement exploration concepts. At the Hog Heaven Project, detailed core scanning and analytical work, as well as additional ground magnetotelluric surveying has allowed for scoping of the next round of exploration concepts for future drilling. At the Gleeson Project, we conducted data compilation and land consolidation and began exploration drilling.
Tintic Project, Utah
The Tintic Project is located near the City of Eureka, approximately 95 km south of Salt Lake City, and can be accessed from U.S. Highway 6, approximately 30 km west of the Interstate 15 junction. As of December 31, 2025, Ivanhoe Electric holds various types of claims and leases through our wholly-owned subsidiary Tintic Copper & Gold Inc. (TCG) or other subsidiaries. Our holdings at the Tintic Project are comprised of 79.23 km2, consisting of patented claims, unpatented mining lode claims, Utah School and Institutional Trust Lands Association (SITLA) mineral leases, Hardrock Prospecting Permits (HRPP) on Bankhead-Jones lands, and various patented claims subject to lease or lease and option agreements.
To retain an unpatented claim on federal land in the USA, a $200 maintenance fee per claim is due annually by September 1st. Based on the current landholding this amounted to $41,200 in annual payments for claim retention at the Tintic Project.
In 2025, certain lands on which TCG has valid unpatented mining claims were transferred to the State of Utah. The cost to maintain claims with the State of Utah is a $100 maintenance per claim, due by December 31 each year. Based on the current landholding this amounted to $29,200 in annual payments for claim retention.
Ivanhoe Electric is a party to various lease and option agreements with land and mineral rights holders throughout the Project area. The estimated annual cost of lease payments is $189,000.
Map: Claims and leases at the Tintic Project.
Royalties. Significant portions of the patented and unpatented mining lode claims are subject to NSR royalty agreements, ranging between 1% and 4%, which would be payable upon production and sale of product, i.e., there are no advance royalties.
Map: Royalties at the Tintic Project.
The Tintic Project is an exploration stage project without Mineral Reserves or Mineral Resources. There is no mine in production at the Tintic Project and no mining activity by us has ever taken place on the land constituting the Tintic Project.
There is currently no significant equipment, infrastructure or facilities at the Tintic Project, and no mine development or operating equipment at the project site. Historical mine equipment, shafts, and adits are ubiquitous throughout the area. There is no mining or operating infrastructure at the Tintic Project that would be intended to be used in future mine operations.
Exploration activities in 2025 included a surface mapping campaign over Sioux Peak, re-logging of several drill holes, and the generation of a drill program targeting carbonate replacement deposits.
Hog Heaven Project
The Hog Heaven Project in Montana is located on private land approximately 80 km south-southwest of the town of Kalispell, Montana. It is in the historical Hog Heaven District which consists of several high-sulfidation epithermal mineral deposits and prospects, as well as several historical mines, including the Flathead Mine. We believe the Hog Heaven District is underexplored at depth, with a substantial alteration footprint and multiple mineralized centers.
In 2021, we entered an earn-in agreement with Brixton Metals Corporation (“Brixton”). Brixton owns the Hog Heaven Project through its subsidiary Brixton USA, covering an area of 24.32 km2 through the following interests: 2.59 km2 of deeded fee simple land both surface and minerals and 14.06 km2 of fee simple mineral rights. The balance, 7.67 km2, is held via lease of three parcels owned by the Chester Company Ltd.
In 2024, Ivanhoe Electric leased a further 4,925 acres of private surface and mineral rights at the Hog Heaven Project from a private owner, advancing additional consolidation of the district and providing additional access to areas prospective for porphyry systems. This lease is effective for an initial 10 year term and can be extended by up to three consecutive ten-year terms.
Ivanhoe Electric’s estimated annual cost of future payments to retain the agreements is $137,680. One milestone payment of $1,000,000 is required in 2026 as part of the earn-in agreement with Brixton.
Figure: Hog Heaven plan map showing Ivanhoe Electric drill hole locations, historical mine workings, and historical drilling.
Exploration activities in 2025 included a magnetotelluric geophysical survey and relogging of core from the 2023-2024 drill program. A follow-up drill program is planned for 2026 to explore for porphyry copper mineralization at depth.
Gleeson Project
The Gleeson Project is an exploration stage project and comprises 268 unpatented federal lode claims, 10 Arizona State Land Department mineral exploration permits, four leases with option, one lease, and one parcel of fee simple land as of December 31, 2025, totaling 37.72 km2.
The Project is located within the historic Courtland-Gleeson mining district (actively mined from 1890-1957) in south-eastern Arizona, which comprises copper-gold-silver-zinc-lead carbonate-replacement deposits hosted in Paleozoic carbonate rocks, intruded by a series of Jurassic intrusions. Exploration is aimed at determining if porphyry copper and carbonate-replacement mineralization is present at depth adjacent to the known fault-displaced mineralization in the historic mining district. Mapping and sampling was progressed across private land within the historic mining district. Drilling is ongoing, having commenced in November 2025, with 1,496.63 meters drilled in two holes as of December 31, 2025.
BHP- Ivanhoe Electric Exploration Alliance (the “BHP Alliance”)
On May 7, 2024, we entered into an Exploration Alliance Agreement with BHP Mineral Resources Inc. (“BHP”) for the exploration of mutually agreed “Areas of Interest” in the United States to identify copper and other critical metal exploration opportunities within those Areas of Interest that may become 50/50 owned joint ventures. The initial Areas of Interest are in New Mexico, Arizona, and Utah.
The Exploration Alliance Agreement is for a term of three years, which may be extended upon mutual agreement. BHP has agreed to provide initial funding of $15 million, and any subsequent funding would be on a 50/50 basis. The Exploration Alliance Agreement contemplates two stages – a Project Generation Phase and a Joint Venture Phase. A subsidiary of Ivanhoe Electric will be the operator during the Project Generation Phase and the operator of a project in the Joint Venture Phase will be mutually agreed upon in the future. During the Project Generation Phase, the parties will conduct early-stage generative exploration activities in the six initial Areas of Interest. The goal of these initial activities is to identify and stake mineral rights within the Areas of Interest to form a project and/or acquire such mineral rights from third parties. For each Area of Interest, an Area of Interest LLC will be created to hold the applicable rights and engage in all early-stage exploration. A subsidiary of Ivanhoe Electric will initially own 100% of each Area of Interest LLC. If agreed by the parties, an Area of Interest will be progressed to the Joint Venture Phase, resulting in the creation of a Joint Venture with 50/50 ownership. The purpose of the Joint Venture Phase is to further explore and evaluate the exploration results to assess its technical and economic merit, and if agreed upon, to develop and operate a mine and associated infrastructure. During the Joint Venture Phase, each Party will contribute pro rata to their respective interest in the Joint Venture in accordance with the applicable Joint Venture documents, with each party having the right to take any product from the Joint Venture in kind in proportion to its equity interest existing at the relevant time.
As of December 31, 2025, staking has occurred on one Area of Interest (AOI) in New Mexico and on one AOI in Arizona.
Ivanhoe Electric provided access to one of the new Generation 2 Typhoon™ systems and a 2D Typhoon™ survey was completed at an AOI in Utah and two 3D Typhoon™ surveys were completed on an AOI in Arizona.
Results from the 3D Typhoon™ survey have resulted in a drill program at the surveyed AOI in Arizona. As of December 31, 2025, approximately 1,600 m have been drilled. The drill program is planned to continue into 2026.
Bristol
The Bristol Project is an exploration stage project and comprises 353 unpatented federal lode claims in Nevada. The Project is hosted in Paleozoic quartzite, shale, and overlying carbonate rocks. The sedimentary sequence was intruded by Oligocene porphyry dikes associated with the western end of the Wah Wah-Tushar magmatic trend (Pioche-Marysvale mineral belt). Mineralization at surface consists of copper-lead-zinc carbonate replacement deposits hosted in Cambrian Carbonate rocks. Subsequent Tertiary extensional normal faulting has dissected and offset the mineral system. Exploration is aimed at determining if a productive porphyry copper-molybdenum-gold system is present at depth.
Lomitas Negras
The optioned Lomitas Negras Project is an exploration stage project and comprises four Arizona State Mineral Exploration Permits over covered basin, concealing Laramide age intrusive rocks prospective for porphyry copper deposits and related mineralization. The area shares some analogs to the nearby San Manuel-Kalamazoo porphyry district.
The Lomitas Negras Project is one of four projects optioned by Ivanhoe Electric from Bronco Creek Exploration Inc. in November 2025. The other projects are the Globe-Miami Projects described below. For each project, Ivanhoe Electric has the right to acquire 100% over an eight-year option period by making aggregate annual payments of up to $2.3 million, and cumulative aggregated exploration expenditures of up to $10.8 million in aggregate on all four optioned projects. Following completion of the payments at each project, Ivanhoe Electric has the right, but not the obligation, to exercise each option and acquire 100% of the relevant project. Ivanhoe Electric may also drop an option at any time without further payment.
Should an option be exercised and Ivanhoe Electric acquires the project, it will convey a 2.5% net smelter return royalty to Bronco Creek but will retain the right to buy-down up to 0.5% of each NSR for $4 million per project over staged payments prior to the commencement of commercial production. Ivanhoe Electric will also be required to make certain pre-production and project development milestone payments following exercise of an option and prior to commercial production.
Globe - Miami
Ivanhoe Electric has optioned three projects in the Globe-Miami area of Arizona: Sleeping Beauty, Dragon’s Tail, and Copper King.
Sleeping Beauty comprises 291 unpatented federal lode claims land and is hosted in Precambrian Granite overlain by late Precambrian sedimentary rocks variably intruded by diabase. These are overlain by Paleozoic carbonate rocks. Host rocks intruded by Laramide Age (64 Ma) stocks and porphyry dikes, with related copper (-molybdenum) mineralization. Exploration is aimed at determining if there is fault-displaced mineralization offset from the nearby Copper Cities deposit, owned by BHP.
Dragon’s Tail comprises 169 unpatented federal lode claims near the Resolution Copper Project, owned by Resolution Copper (A Rio Tinto and BHP Joint Venture). The Project is hosted in Proterozoic Apache Group supra-crustal rocks, diabase sills, and Paleozoic carbonates (same host rocks as the Resolution Copper deposit) overlain with post-mineral Tertiary volcanics. Exploration is aimed at determining if porphyry copper mineralization is present.
Copper King comprises 232 unpatented federal lode claims near the Resolution Copper Project, owned by Resolution Copper. As with Dragon’s Tail, the Project is hosted in Proterozoic Apache Group supra-crustal rocks, diabase sills, and Paleozoic carbonates (same host rocks as the Resolution Copper deposit) overlain with post-mineral Tertiary volcanics. Exploration is aimed at determining if porphyry copper mineralization is present.
International
Saudi Arabian Joint Venture
In 2023, Ivanhoe Electric and Maaden established a Saudi Arabian exploration Joint Venture (the “Joint Venture”) through the limited liability company, Saudi JVCo, to unlock the significant mineral potential in Saudi Arabia. The Joint Venture has at the date of this annual report exclusive access to explore approximately 50,000 km2 of underexplored land on the Arabian Shield that Maaden has made available to the Saudi JVCo.
Map: Location of the Ivanhoe Electric Maaden Joint Venture within the country of Saudi Arabia.
On September 2, 2025, the Company announced that Maaden had made available an additional 1,345 km2 of exploration licenses to the Joint Venture, including the Musayna’ah, La Huf, Mahd, and Baara Exploration Licenses.
The Musayna’ah Licenses, totaling 946 km2, encompass an area exhibiting the characteristics and widespread mineralization and alteration assemblages typical of iron oxide copper gold (IOCG) deposits. Exploration work by Maaden
has defined several large areas of highly anomalous copper in soil geochemistry, where earlier exploration drilling intersected widespread low-grade copper mineralization, and localized higher-grade domains associated with structures. Only a small portion of the approximately seven-kilometer-long main anomalous footprint has been explored.
The La Huf, Mahd, and Baara Exploration Licenses (the “Mahd Area Licenses”) comprise 399 km2 adjacent to Maaden’s Mahd Ad Dhahab gold mine, known as the “Cradle of Gold,” and which has been in production for over 3,000 years. Historical exploration by Maaden included shallow drilling primarily aimed at defining near-surface gold deposits, which intersected gold mineralization with associated copper and zinc. The licenses are prospective for additional precious and base metal mineralization beneath the limits of shallow historical drilling.
For full year 2025, the Joint Venture has completed approximately 933 square kilometers (1,270 square kilometers to date) of geophysical surveys using the Company’s advanced Typhoon™ system and drilled four holes totaling approximately 2,130 meters (16 holes for 10,461 meters to date) across the Al Amar Belt, and seven holes totaling 2,282 meters across the Wadi Bidah Belt. Drilling at Al Amar hit narrow intervals of low- to high-grade base and precious metals mineralization associated with Typhoon™-identified anomalies at depths of up to one kilometer.
For 2026, the Joint Venture plans to continue Typhoon™ surveying at the Wadi Bidah, Musayna’ah, and Mahd Licenses. The Joint Venture will also start large scale surveying in the new Dhiran licenses, which was awarded to the Joint Venture in the Ministry of Mines’ “Tender Round 9” process run in late 2025. The Dhiran licenses are the only exploration licenses owned by the Joint Venture and are not made available to the Joint Venture from Maaden. Surveying will also take place on the platform licenses, starting with Ar Rayn B. This surveying is in addition to ongoing geological work, geochemical sampling, ground gravity and ground magnetic surveying. Drilling is currently underway at the Wadi Bidah area, and is being planned for Bir Umq, Mussayna’ah, Dhiran and the Platform later in the year.
Ivory Coast Nickel-Copper Project, Ivory Coast (the “Ivory Coast Project”)
The Ivory Coast Project is located approximately 650 road km northwest of Abidjan, Ivory Coast. As of December 31, 2025, our 69.1% interest in the Ivory Coast Project was held through our 22.7% equity interest in Sama and our 60% interest in the SNC joint venture described below. In 2024 we completed our 60% earn-in into SNC and as at December 31, 2025, we directly owned 60% of the joint venture entity SNC.
The Ivory Coast Project consists of four exploration permits and one exploration permit application owned by SNC, which is the joint venture vehicle in which we are partnering with Sama to advance the Ivory Coast Project, which cover a total of 839.03 km2 Two of the exploration permits are held in a 66 2/3 / 33 1/3 joint venture with Société pour le Développement Minier de la Côte d’Ivoire (SODEMI), a parastatal organization established by the Ivory Coast and which together cover 319 km2 of the Ivory Coast Project.
In April 2018, pursuant to an investment agreement, Sama granted to us a right to nominate to the Sama board of directors two (2) directors as long as our shareholding interest of Sama remains above 10% but less than 50%, and four (4) directors if our shareholding rises to greater than 50%. Mr. Quentin Markin and Mr. Terry Krepiakevich are our director representatives on the board of Sama.
The Mineral Resource estimate for the Ivory Coast Project is set forth below, under the heading “Mineral Resources and Mineral Reserves”. Glen Kuntz, P. Geo., our non-independent Qualified Person, reviewed and confirmed that the estimate satisfied S-K 1300 standards and remained accurate as of December 31, 2025.
Map: Location of the Ivory Coast Project within the country Ivory Coast.
The 2025 exploration program included plans for 4,500 m of diamond drilling as well as updated environmental and social baseline studies to support Project advancement toward a mining permit application. Approximately 840 m of exploration drilling were completed at the Mossikro Prospect 10 km to the south-southwest of the existing mineral resources. Drilling was also conducted to the southwest of the Samapleu Extension Deposit. The remaining drilling is anticipated to take place in 2026.
Alacrán Copper-Gold Project, Colombia (the “Alacrán Project”)
On July 31, 2017, we (then HPX) entered into an investment agreement with Cordoba. Under that agreement, Cordoba granted us a right to nominate directors to its board of directors based on our pro rata interest in Cordoba. The investment agreement provides for our nominees to the Cordoba board to be reduced to less than a majority of the directors if our ownership interest in Cordoba is diluted to below 50%, with further proportional reductions thereafter. Assuming the board of Cordoba is comprised of seven directors and we hold a 50% or greater interest in Cordoba, we are entitled to nominate four directors, with at least one of such nominees being independent. We owned 60.8% of Cordoba as of December 31, 2025 and had nominated four directors to the Cordoba board: Quentin Markin, Jordan Neeser, Glen Kuntz and Terry Krepiakevich.
On May 8, 2023, Cordoba closed on a strategic arrangement with JCHX, whereby JCHX, through a wholly owned subsidiary, acquired a 50% ownership interest in CMH Colombia S.A.S. (“CMH”), a company existing under the laws of Colombia, for aggregate consideration of $100 million. As of July 4, 2025, JCHX had paid $100 million pursuant to the terms of the arrangement, including the final payment of $20 million received after waiving the condition of the approval of an Environmental Impact Assessment (“EIA”) by the relevant Colombian Government authority.
On May 8, 2025, Cordoba, signed a definitive Framework Agreement for the sale of the Company’s remaining 50% interest in the Alacrán Copper Project to a consortium of investors including JCHX (“JCHX Consortium”), a 19.2% shareholder of Cordoba, for up to $128 million, consisting of $88 million in cash on closing, $12 million in a deferred payment, and up to $28 million in a contingent payment depending on the copper price at the time of commercial production. The closing of the transaction was contingent upon the approval of the EIA.
On February 10, 2026, the agreement was amended to, among other things, provide for the full $128 million purchase price to be paid at closing and remove any post-closing payments, waive the closing condition of an Environmental Impact Assessment, add a new closing condition of JCHX shareholder approval, and extend the outside date to March 10, 2026. Cordoba has also agreed to use commercially reasonable efforts to distribute to its shareholders the net proceeds after satisfying all liabilities and obligations, subject to required approvals, such that $10 million will remain in Cordoba.
Following the closing of the transaction, Cordoba will continue to be a publicly listed company on the TSX Venture Exchange and will undertake a search for new business development opportunities. The Company will continue to hold the majority of Cordoba’s shares. See “Risk Factors — Risks Relating to Our Operations — There is no guarantee that the sale transaction will close or the payments due under the agreement for the sale of Cordoba’s remaining interest in the Alacrán Copper Project will be received.”
The Alacrán Project is situated in the municipality of Puerto Libertador, which is approximately 390 km northwest of Bogotá, and 160 km north of Medellín in Colombia, amongst 22 mining concessions owned by CMH or its affiliates, of which, 5 licenses are part of the Alacran Project. Cordoba conducted several exploration programs between 2012 and 2023, consisting of geological mapping, geochemical sampling, geophysical surveys, and various drilling campaigns, that supported the completion of the technical studies in 2019, 2022 and 2023, which marks the beginning of the development phase for the Alacran Project.
Map: Location of the Alacrán Project within the country of Colombia.
The Mineral Resource and Mineral Reserve estimate for the Alacrán Project is set forth below, under the heading “Mineral Resources and Mineral Reserves”. Glen Kuntz, P. Geo., our non-independent Qualified Person, reviewed and confirmed that the projected economics and the Mineral Resource estimate satisfied S-K 1300 standards and remained accurate as of December 31, 2025. Colin Shaw, P.E., our non-independent Qualified Person, reviewed and confirmed that the Mineral Reserve estimate satisfied S-K 1300 standards and remained accurate as of December 31, 2025.
Pinaya Copper-Gold Project, Peru (the “Pinaya Project”).
The Pinaya Project is 100% owned by Ivanhoe Electric through Ivanhoe Electric’s subsidiary Kaizen Discovery Peru (Kaizen). Kaizen filed an NI 43-101 technical report for the Pinaya Project, titled “Pinaya Gold-Copper Project Technical Report” and which was prepared jointly by Brian Cole, P.Geo, and Ronald Simpson, P.Geo,, with an effective date of April 26, 2016 (“Pinaya Technical Report”), which is available on SEDAR. Scientific and technical information in this section regarding the Pinaya Project is based upon, or in some cases extracted from, the Pinaya Technical Report.
The Mineral Resource estimate for the Pinaya Project is set forth below, under the heading “Mineral Resources and Mineral Reserves”. Ronald G. Simpson, P.Geo., an independent Qualified Person, reviewed and confirmed that the Mineral Resource estimate satisfied S-K 1300 standards and remained accurate as of December 31, 2025.
Map: Location of the Pinaya Project within the country of Peru.
Summary
Our portfolio of mineral exploration projects and equity investments are summarized in the tables below.
Table: United States Mineral Exploration Projects as of December 31, 2025.
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Project Name | | Location and Project Size | | Stage of Development | | Ivanhoe Electric Interest and Nature of Interest | | Title Holders / Operator | | Primary Minerals | | Nature of Mineral Title | | Mineral Resources/ Reserves | | Aggregate Annual Production – Last 3 Fiscal Years |
Santa Cruz Copper | | Arizona, USA Surface 24.04 km2 | | Development | | 100% of surface rights | | Mesa Cobre Holding Corp., a wholly-owned subsidiary (surface rights) | | Copper | | Fee Simple land, unpatented mining claims; Arizona State exploration permits | | Mineral Resource and Reserve | | Not in production |
| Mineral 75.66 km2 | | Development | | 100% of the mineral title | | Mesa Cobre Holding Corp., a wholly owned subsidiary (remaining titles) | | | | |
| | | | | | | | | | | | | | | | |
| Tintic | | Utah, USA 79.23 km2 | | Exploration | | Options and lease rights to 100% of the mineral title by acreage | | Tintic Copper & Gold, Inc., a wholly-owned subsidiary | | Copper Gold | | Patented and unpatented mining claims; SITLA leases, Hardrock Prospecting Permit leases, and SITLA applications | | n/a | | Not in production |
| | | | | | | | | | | | | | | | |
| Hog Heaven | | Montana, USA 69.5 km2 | | Exploration | | 1.6% equity ownership of Brixton Metals Corporation 0.1% ownership in Brixton USA, with earn-in up to a 75% project interest | | Brixton USA Corp. (joint venture company), a subsidiary of Brixton | | Copper Silver Gold | | Fee simple mineral rights, owned and leased, fee simple surface | | n/a | | Not in production |
| | | | | | | | | | | | | | | | |
Gleeson | | Arizona, USA 37.72 km2 | | Exploration | | 100% Ownership | | Diamondback Copper, LLC. and IE Montana Holdings Corp., wholly owned subsidiaries | | Copper | | Unpatented mining claims; Arizona State exploration permits; owned and leased lands; Fee Simple land | | n/a | | Not in production |
| | | | | | | | | | | | | | | | |
BHP Alliance | | New Mexico, USA 45.05 km2 Arizona, USA 77.03 km2 | | Exploration | | 100% Ownership | | Sand Hill Exploration, Inc., a wholly owned subsidiary | | Copper | | Owned or optioned unpatented mining claims | | n/a | | Not in production |
| | | | | | | | | | | | | | | | |
| Bristol | | Nevada, USA 26.62 km2 | | Exploration | | 100% Ownership | | Ivanhoe Electric Nevada Holdings Inc., a wholly owned subsidiary | | Copper | | Unpatented mining claims | | n/a | | Not in production |
| | | | | | | | | | | | | | | | |
| Perseverance | | Arizona, USA 116.23 km2 | | Exploration | | 60.8% shareholder in Cordoba, which has 51% ownership - 31.8% ownership interest | | MMDEX LLC a joint venture company between Cordoba and Bell Copper Corp. | | Copper | | Fee simple, Arizona State Mineral Exploration Permits | | n/a | | Not in production |
| | | | | | | | | | | | | | | | |
Lomitas Negras | | Arizona, USA 10.11 km2 | | Exploration | | Option for 100% Ownership | | Mesa Cobre Holding Corp., a wholly-owned subsidiary | | Copper | | Arizona State Mineral Exploration Permits | | n/a | | Not in production |
| | | | | | | | | | | | | | | | |
Sleeping Beauty | | Arizona, USA 29.13 km2 | | Exploration | | Option for 100% Ownership | | Mesa Cobre Holding Corp., a wholly-owned subsidiary | | Copper | | Unpatented mining claims | | n/a | | Not in production |
| | | | | | | | | | | | | | | | |
Dragon’s Tail | | Arizona, USA 12.82 km2 | | Exploration | | Option for 100% Ownership | | Mesa Cobre Holding Corp., a wholly-owned subsidiary | | Copper | | Unpatented mining claims | | n/a | | Not in production |
| | | | | | | | | | | | | | | | |
Copper King | | Arizona, USA 17.33 km2 | | Exploration | | Option for 100% Ownership | | Mesa Cobre Holding Corp., a wholly-owned subsidiary | | Copper | | Fee simple, Arizona State Mineral Exploration Permits | | n/a | | Not in production |
Table: International Mineral Exploration Projects as of December 31, 2025.
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Project Name | | Location and Project Size | | Stage of Development | | Ivanhoe Electric Interest and Nature of Interest | | Title Holders / Operator | | Primary Minerals | | Nature of Mineral Title | | Mineral Resources/ Reserves | | Aggregate Annual Production – Last 3 Fiscal Years |
| Saudi Arabia | | Saudi Arabia 50,047.64 km2 | | Exploration | | 50% ownership of Joint Venture with Maaden | | Maaden/Ivanhoe Electric | | Base Metals Precious Metals | | Exploration license or application | | n/a | | Not in production |
| | | | | | | | | | | | | | | | |
SQM Collaboration | | Antofagasta, Chile 2,002 km2 | | Exploration | | 0% IE ownership with option to 50% on a qualifying copper discovery | | SQM and affiliates | | Copper | | Mining concessions | | n/a | | Not in production |
| | | | | | | | | | | | | | | | |
Alacrán | | Colombia 104.6 km2 | | Development | | Shareholder in Cordoba | | Cordoba | | Copper Gold Silver | | Construction and Assembly; Exploration licenses | | Mineral Resource & Mineral Reserve | | Not in production |
| | | | | | | | | | | | | | | | |
| Ivory Coast Project | | Ivory Coast 1,125 km2 | | Exploration | | 60% ownership of the Ivory Coast Project; Shareholder in Sama | | Société pour le Développement Minier de la Côte d’Ivoire | | Nickel Copper Cobalt PGE | | Exploration license | | Mineral Resource | | Not in production |
| | | | | | | | | | | | | | | | |
Pinaya | | Peru 100.65 km2 | | Exploration | | 100% ownership | | Canper Exploraciones S.A.C. | | Copper Gold | | Concession | | Mineral Resource | | Not in production |
Mineral Project Obligations and Payments
As described above, for many of our mineral projects, we do not own the underlying mineral titles or rights but maintain an option or a right to acquire such titles or rights. Such options or rights may be held through an option arrangement, an earn-in, or through the payment of deferred consideration.
The table below summarizes the cash payments that may be made in respect of each project. Commitments that are non-discretionary are payments we are required to make. Payments that are discretionary are payments that we are not required to make, but if we fail to make the payment in the amounts and when due, we will lose the rights associated with the project.
Table: Mineral Project Obligations and Payments 2026 - 2032, as at December 31, 2025 ($ thousands).
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Mineral Project | | Commitment | | 2026 | | 2027 | | 2028 | | 2029-2032 | | 2026-2032 Total |
| Hog Heaven | | Discretionary | | $ | 1,000 | | | $ | 1,000 | | | $ | 1,727 | | | $ | 15,000 | | | $ | 18,727 | |
| Tintic | | Discretionary | | 335 | | | 125 | | | 120 | | | 350 | | | 930 | |
| Gleeson | | Non-discretionary | | 652 | | | — | | | — | | | — | | | 652 | |
| Gleeson | | Discretionary | | 494 | | | 39 | | | 1,057 | | | 403 | | | 1,993 | |
| Copper King | | Discretionary | | 25 | | | 50 | | | 650 | | | 3,550 | | | 4,275 | |
| Dragon's Tail | | Discretionary | | 25 | | | 50 | | | 650 | | | 3,550 | | | 4,275 | |
| Lomitas Negras | | Discretionary | | 15 | | | 15 | | | 225 | | | 1,345 | | | 1,600 | |
| Sleeping Beauty | | Discretionary | | 25 | | 25 | | 450 | | 2,475 | | 2,975 |
| Perseverance (Cordoba) | | Discretionary | | 8,169 | | — | | — | | — | | 8,169 |
| Total | | | | $ | 10,740 | | | $ | 1,304 | | | $ | 4,879 | | | $ | 26,673 | | | $ | 43,596 | |
Mineral Resources and Reserves
Below is a summary table of estimated in situ Mineral Resources as at December 31, 2025, which are presented on an attributable basis, exclusive of Mineral Reserves.
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Company | | Deposit | | Attributable Ownership of Deposit | | Category | | Attributable Tonnes | | Total Cu (%) | | Ni (%) | | Au (g/t) | | Ag (g/t) | | Attributable Contained Cu (tonnes) | | Attributable Contained Ni (tonnes) | | Attributable Contained Au (oz) | | Attributable Contained Ag (oz) | | Geographic Area | | Resource Category |
Ivanhoe Electric Inc.- Mesa Cobre Inc.1 | | Santa Cruz | | 100.0% | | Indicated | | 178,451,000 | | 0.80 | | — | | 0.024 | | 1.43 | | 1,435,000 | | — | | 139,000 | | 8,211,000 | | Arizona,U.S. | | Copper |
| | | Inferred | | 31,998,000 | | 0.73 | | — | | 0.021 | | 1.78 | | 232,000 | | — | | 21,000 | | 1,832,000 | | |
| East Ridge | | | Indicated | | 4,407,000 | | 0.94 | | — | | 0.015 | | 0.71 | | 41,000 | | — | | 2,000 | | 101,000 | | |
| | | Inferred | | 48,676,000 | | 0.89 | | | | 0.006 | | 0.40 | | 436,000 | | — | | 9,000 | | 623,000 | | |
| Texaco | | | Inferred | | 341,345,000 | | 0.78 | | — | | 0.028 | | 0.81 | | 2,664,000 | | — | | 302,000 | | 8,850,000 | | |
Ivanhoe Electric Inc. - Kaizen Discovery Peru SAC2 | | Pinaya | | 100.0% | | Measured | | 8,204,000 | | 0.326 | | — | | 0.600 | | — | | 27,000 | | — | | | 158,000 | | — | | | Peru | | Copper Gold |
| | | Indicated | | 33,487,000 | | 0.324 | | — | | 0.462 | | — | | 108,000 | | — | | 497,000 | | — | | | |
| | | Inferred | | 40,216,000 | | 0.360 | | — | | 0.300 | | — | | 145,000 | | — | | 388,000 | | — | | | |
Sama Nickel Corporation Inc.3,4 | | Samapleu Main | | 69.1% | | Indicated | | 10,536,000 | | 0.22 | | 0.26 | | 0.04 | | — | | 24,000 | | 27,000 | | 13,000 | | — | | Ivory Coast | | Nickel Copper |
| | | Inferred | | 14,747,000 | | 0.21 | | 0.25 | | 0.04 | | — | | 30,000 | | 37,000 | | 17,000 | | — | | |
| Samapleu Extension | | | Indicated | | 355,000 | | 0.16 | | 0.25 | | 0.02 | | — | | 600 | | 1,000 | | 300 | | — | | | |
| | | Inferred | | 7,522,000 | | 0.22 | | 0.28 | | 0.02 | | — | | 16,000 | | 21,000 | | 6,000 | | — | | | |
| Grata | | | Indicated | | 2,519,000 | | 0.29 | | 0.28 | | 0.04 | | — | | 7,000 | | 7,000 | | 4,000 | | — | | | |
| | | Inferred | | 46,485,000 | | 0.25 | | 0.24 | | 0.04 | | — | | 115,000 | | 113,000 | | 57,000 | | — | | | |
| Sipilou Sud | | | Inferred | | 1,448,000 | | — | | 1.75 | | — | | — | | — | | | 25,000 | | — | | | — | | | |
Cordoba Mineral Corp.5 | | Alacran | | 31.2% | | Indicated | | 475,000 | | — | | — | | 0.28 | | 0.88 | | — | | | — | | 4,000 | | 13,000 | | Colombia | | Copper Gold Silver |
| Inferred | 9,934,000 | 0.20 | — | 0.25 | 1.10 | 20,000 | — | 81,000 | 343,000 |
Total6 | | | | | | Measured | | 8,204,000 | | — | | — | | — | | — | | 27,000 | | — | | | 158,000 | | — | | | — | | — |
| | | | | Indicated | | 230,230,000 | | — | | — | | — | | — | | 1,615,600 | | 35,000 | | 659,300 | | 8,325,000 | | — | | — |
| | | | | Inferred | | 542,371,000 | | — | | — | | — | | — | | 3,658,000 | | 196,000 | | 881,000 | | 11,648,000 | | — | | — |
Below is a summary table of estimated in situ Mineral Reserves as at December 31, 2025, which are presented on an attributable basis.
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Company | | Deposit | | Attributable Ownership of Deposit | | Category | | Tonnes | | Total Cu (%) | | Ni (%) | | Au (g/t) | | Ag (g/t) | | Attributable Contained Cu (tonnes) | | Attributable Contained Ni (tonnes) | | Attributable Contained Au (oz) | | Attributable Contained Ag (oz) | | Geographic Area | | Resource Category |
Ivanhoe Electric Inc.- Mesa Cobre Inc.7 | | Santa Cruz | | 100.0% | | Probable | | 132,061,000 | | 1.08 | | | — | | | — | | | — | | | 1,430,000 | | — | | | — | | | — | | | Arizona, U.S. | | Copper |
| East Ridge | | | Probable | | 4,112,000 | | 1.03 | | | — | | | — | | | — | | | 42,000 | | — | | | — | | | — | | | |
Cordoba Mineral Corp.8 | | Alacran | | 31.2% | | Probable | | 30,560,000 | | 0.41 | | | — | | | 0.23 | | | 2.63 | | | 126,000 | | — | | 230,000 | | 2,586,000 | | Colombia | | Copper Gold Silver |
Total | | — | | — | | Probable | | 166,733,000 | | — | | | — | | | — | | | — | | | 1,598,000 | | — | | | 230,000 | | 2,586,000 | | — | | | — | |
1S-K Preliminary Feasibility Study & Technical Report Summary, Santa Cruz Copper Project, Arizona, dated June 23, 2025 • The mineral resources in this estimate were independently prepared, including estimation and classification, by BBA USA Inc., and are reported in accordance with the definition for mineral resources in S-K 1300. • Mineral resources that are not mineral reserves do not have demonstrated economic viability. • Mineral resources constrained assuming underground mining methods for the Santa Cruz deposit are reported at an NSR cutoff of US$32.00 for heap leach and US$34.00 for concentrator; Texaco deposit is reported at a NSR cutoff of US$32.00 for heap leach and US$34.00 for concentrator; and East Ridge deposit is reported at a NSR cutoff of US$40.00 for longhole stoping and US$50.00 for drift and fill. The cutoff reflects the total operating costs to define reasonable prospects for economic extraction by conventional underground mining methods. Material from within mineable shape-optimized wireframes has been included in the mineral
resource. Underground mineable shapes optimization parameters include a long-term copper price of US$4.00/lb, gold price of US$1,900/oz, and silver price of US$24.00/oz. Process costs of US$7.00 to US$9.00 per processed tonne; direct mining costs between US$22.00 to US$40.00 per processed tonne reflecting various mining method costs (leach, long hole or drift and fill), mining general and administration costs of US$2.63 per processed tonne, onsite processing costs between US$31.63 to US$49.63 per processed tonne, along with variable royalties between 5.01% to 6.96% NSR, and a mining recovery of 100%. • Mineral resources are estimated using metallurgical recoveries for heap leach of 96% for acid soluble copper, 83% for cyanide soluble copper, 22% for residual copper, 0% for gold and 0% for silver. Recoveries for concentrator are 0% for acid soluble copper, 90% for cyanide soluble copper, 90% for residual copper, 59% for gold, and 69% for silver. BBA, our independent Qualified Person, reviewed and confirmed that the Mineral Resource estimates presented in the table above remained accurate as of December 31, 2025.
2Kaizen Discovery Inc. Copper‐equivalent grade estimate based on $2.84/lb copper and $1,236/oz gold. Mineral Resources are reported at cut‐off grades of 0.25 g/t Au and 0.3% Cu Equivalent and average metallurgical recoveries of 80%. Ronald G. Simpson, P.Geo., an independent Qualified Person, reviewed and confirmed that the Mineral Resource estimates presented in the table above satisfy S-K 1300 standards and remained accurate as of December 31, 2025.
3Sama Nickel Corporation Inc. Assumptions include NSR Cut-off grade of $16.34/t milled; long-term metal prices of $3.75/lb Cu, $8.70/lb Ni, and $1,690/oz Au; mining costs of $1.68/t Saprolite, $2.26/t Fresh, $0.05/t incremental and $0.09/t sustaining capital, $13.02/t milled processing cost, $.3.32/t milled G&A, treatment charge of $105/t Cu concentrate and $346/t concentrate Ni; and metallurgical recoveries varied based on concentration and grade. Glen Kuntz, P.Geo., our non-independent Qualified Person, reviewed and confirmed that the Mineral Resource estimates presented in the table above satisfy S-K 1300 and in footnote 4 standards remained accurate as of December 31, 2025.
4Sama Nickel Corporation Inc. The Mineral Resource Estimate includes an inferred estimate for the Sipilou Sud laterite deposit including 2,095,000 tonnes of laterite at 1.75% nickel and 0.05% cobalt at a cut-off grade of 1.10% nickel. The deposit has an estimated 37,000 tonnes of nickel and 1,000 tonnes of cobalt.
5Cordoba Minerals Corp. NI 43-101 Technical Report & Feasibility Study, Alacrán Project, in Colombia, Mineral Resource effective December 18, 2023 - NSR cut-off grade varied from $2.08/t to $9.88/t milled based on processing, and G&A costs as well as the recoveries in different unit, long term metal prices of $3.80/lb Cu, $1,690/oz Au, and $22.50/oz Ag. Glen Kuntz, P.Geo., our non-independent Qualified Person, reviewed and confirmed that the Mineral Resource estimates presented in the table above satisfy S-K 1300 standards remained accurate as of December 31, 2025. Cordoba entered into an agreement to sell its remaining 50% interest in the Alacrán Project on May 8, 2025, which was amended on February 10, 2026.
6Total inferred Mineral Resources include an inferred estimate for the Sama Nickel Corporation Inc. Sipilou Sud laterite deposit including 2,095,000 tonnes of laterite at 1.75% nickel and 0.05% cobalt at a cut-off grade of 1.10% nickel. The deposit has an estimated 37,000 tonnes of nickel and 1,000 tonnes of cobalt.
7S-K Preliminary Feasibility Study & Technical Report Summary, Santa Cruz Copper Project, Arizona, dated June 23, 2025 • The mineral reserves were independently prepared, including estimation and classification, by BBA USA Inc. They are reported in accordance with the definitions for mineral reserves in S-K 1300. • The point of reference for the estimate is the point of delivery to the process facilities. • Mineral reserves are defined within stope designs that are prescribed by rock mechanics, considering the specific characteristics of deposits, mineral domains, mining methods, and the mining sequence. Transverse longhole stoping is the optimal mining method with uppers and cut & fill methods used where appropriate. Mining will occur in blocks, extracting ore from the bottom upwards, with paste backfill providing ground support to sustain a production rate of 20,000 tonnes per day for the first 15 years of operation. • Mineral reserves are estimated at an NSR cutoff value of $43.95/t for longhole stoping and $60/t for longitudinal retreat stopes and drift and fill. The NSR values reflect the discrete metallurgical responses for each mineral reserve block using metallurgical recoveries for heap leach of 96% for acid soluble copper, 83% for cyanide soluble copper, 22% for residual copper. Underground mineable shapes optimization parameters include a long-term copper price of US$4.00/lb. • Mineral reserves account for mining loss and dilution. 6. Mineral reserves are a subset of the indicated mineral resource and do not include the inferred mineral resource. • BBA, our independent Qualified Person, reviewed and confirmed that the Mineral Resource estimates presented in the table above remained accurate as of December 31, 2025.
8Cordoba Minerals Corp. NI 43-101 Technical Report & Feasibility Study, Alacran Project, in Colombia, Mineral Reserve effective October 21, 2021 - Open pit cut-off value varied from $2.07/t to $10.26/t milled based on processing, and G&A costs as well as the recoveries in different units. Long term metal prices of $3.80/lb Cu, $1,690/oz Au, and $22.50/oz Ag. Colin Shaw, P.E., our non-independent Qualified Person, reviewed and confirmed that the Mineral Reserve estimates presented in the table above satisfy S-K 1300 standards remained accurate as of December 31, 2025. Cordoba entered into an agreement to sell its remaining 50% interest in the Alacran Project on May 8, 2025, which was amended on February 10, 2026.
Typhoon™
We own, through a wholly-owned subsidiary, patents to a proprietary exploration technology known as Typhoon™. When we reference “our” Typhoon™ technology, we mean the technology that is covered by patents owned by our wholly-owned subsidiary Geo27, Inc. (“Geo27”). We also are the exclusive worldwide licensee of certain technology in the field of geological survey for mineral exploration from I-Pulse Inc. (“I-Pulse”). I-Pulse is the parent of our predecessor company, HPX.
Typhoon™ is the brand name for our proprietary electrical geophysical surveying transmitter, which can detect the presence of sulfide minerals containing copper, nickel, gold and silver, as well as water and oil (although the Company does not hold any rights to water and oil exploration). The technology was developed by I-Pulse to unlock exploration in areas where potential deposits are hidden by cover, where target depths exceed the range of conventional geophysical surveying systems, or where the scale and topography of an exploration target area prevents efficient and cost-effective conventional work. Typhoon™ allows us to potentially discover deposits otherwise thought to be undetectable through conventional survey methods and technology.
We own the issued patents shown below. These patents cover certain aspects of our Typhoon™ technology. The actual protection afforded by these patents varies depending on the scope of coverage of each individual patent as well as the availability of legal remedies in each jurisdiction.
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Type | | Short title | | Country | | Grant Date | | Grant Number | | Expiration Date |
| Patent | | Current signal generator and method of implementing such a generator | | France | | 16/02/2018 | | FR2980653 | | 22/09/2031 |
| | Australia | | 05/01/2017 | | AU2012311429 | | 21/09/2032 |
| | Brazil | | 19/01/2021 | | BR112014006276 | | 21/09/2032 |
| | Canada | | 22/05/2018 | | CA2849558 | | 21/09/2032 |
| | Indonesia | | 03/02/2026 | | N/A | | 21/09/2032 |
| | Turkey | | 21/04/2015 | | TR201403350B | | 21/09/2032 |
| | USA | | 28/02/2017 | | US9584037 | | 18/09/2033 |
| Patent | | Current generator and method for generating current pulses | | France | | 04/04/2014 | | FR2988933 | | 30/03/2032 |
| | Australia | | 02/02/2017 | | AU2013241675 | | 29/03/2033 |
| | Canada | | 08/09/2020 | | CA2869170 | | 29/03/2033 |
| | Chile | | 30/10/2018 | | CL56649 | | 29/03/2033 |
| | Peru | | 20/05/2019 | | PE9489 | | 29/03/2033 |
| | USA | | 28/06/2016 | | US9379636 | | 03/06/2033 |
| Patent | | Switch and system to inject current | | France | | 28/01/2022 | | FR3105446 | | 20/12/2039 |
We believe the following specifications differentiate Typhoon™ from conventional geophysical systems:
•high current that is adjustable according to the depth and scale of the exploration target;
•high voltages that are also adjustable to overcome near-surface resistance;
•the ability to transmit both electromagnetic and direct current signals;
•extremely clean signal, which yields a high signal to noise ratio in recorded data;
•the ability to synchronize with multiple types of data receivers, so that the user can choose the receiver system most appropriate for the exploration environment; and
•three deployment configurations, from a large containerized system to a smaller lightweight system that is helicopter portable.
Figure: Schematic of Typhoon™ at work.
We currently have four 1st Generation Typhoon™ units and six 2nd Generation Typhoon™ units, which allow us to evaluate multiple prospects at any given time. Three of the 2nd Generation units are owned by the Saudi JVCo and used under license. One 2nd Generation unit is dedicated to the Exploration Alliance with BHP. A second 2nd Generation unit is dedicated to the Collaboration with SQM.
The data processing and artificial intelligence software developed by our subsidiary CGI complements our Typhoon™ technology and represents the only software product that can efficiently process the full spectrum of geophysical data produced by Typhoon™.
Computational Geosciences
CGI is headquartered in Vancouver, British Columbia, Canada. It was founded in 2010 in order to capitalize on advanced software technology developed at the University of British Columbia that was designed to improve mineral exploration. The technology has undergone significant improvements over the years and extended its market reach into the oil & gas sector as well as geothermal and water exploration activities. As of December 31, 2025, we owned 94.3% of CGI’s outstanding shares while 5.6% are equally held by CGI’s two co-founders. CGI was co-founded by Livia Mahler B.Sc., MBA, who currently serves as a Senior Business Advisor, and Dr. Eldad Haber Ph.D., who currently serves as CGI’s Chief Technology Officer, and is a professor at the University of British Columbia.
CGI’s technology consists of sophisticated software codes and artificial intelligence tools (“AI”). The software codes are used to process geophysical data (including that generated by Typhoon™) in order to build accurate 3D subsurface images that indicate the presence of various metals and minerals, as well as hydrocarbons, geothermal sources, and water reservoirs. The AI tools use machine learning networks and proprietary deep-learning algorithms that analyze vast amounts of geoscientific data to generate prospectivity maps for greenfields and brownfields mineral exploration.
CGI provides fee-for-service and software licensing agreements to customers in the area of critical minerals, energy and water exploration. CGI’s services apply its geophysical data inversion codes on geophysical data (included that of Typhoon™) collected by third party data acquirers as well as other sources such as public or private libraries, in order to construct and refine 3D subsurface images. These services help CGI’s customers in geophysical survey design through more accurately identifying potential resource targets for exploration while minimizing the operational footprint of those exploration activities. CGI also offers mineral prospectivity mapping services which are based on deep learning AI algorithms to help identify and rank prospective areas for critical minerals. In order to prepare diverse layers for AI algorithms, CGI uses unique tools such as data augmentation for sparse, unstructured data which enhance the results and provide critical knowledge of the subsurface for clients.
CGI applies its services not only to mineral projects but also to the global energy industry and in the search for underground water resources. In the energy sector, CGI has independently developed and collaborated to deploy a real-time 3D inversion service for resistivity logging-while-drilling (“LWD”) data, significantly optimizing well placement and well
completion designs to maximize reservoir productivity. CGI is also able to monitor fluid substitution within reservoirs, whether for enhanced oil recovery or carbon capture and storage. With respect to the identification of underground water resources, CGI’s technology can also be deployed to predict prospective areas or delineate known water aquifers.
CGI does not patent its software codes. CGI owns, maintains and develops codes for magnetics, gravity, DC/IP and electromagnetics. CGI is actively engaged in research and development, and its staff regularly participate in international conferences as authors and co-authors of scientific papers.
CGI’s intention is to grow its client base in the mining and energy sectors for existing geophysical inversion and AI-based services in order to increase its revenue from third-party sources. CGI is actively working on enhancing geophysical inversion codes to improve the accuracy and efficiency of data quality control and to facilitate advanced inversion of Multiphysics datasets. On the AI front, CGI continues to improve the prospectivity mapping approach with new architectures and improved vector outputs. CGI is also building large geoscience databases from vast amounts of publicly available data in various countries and regions of the world in order to use these datasets to map minerals, water, geothermal and other targets. CGI competes with geophysical data processors, airborne and ground surveyors, off-shore surveyors, and AI service providers. These include companies such as TechnoImaging, LLC, Geotech Ltd., Quantec Geoscience, KoBold Metals, ALS (Geoanalytics), and VRIFY.
VRB Energy - Vanadium Redox Flow Technology
In October 31, 2024, VRB Energy, a 90% owned subsidiary of Ivanhoe Electric, closed on a transaction providing for the creation of a 49%/51% joint venture (“VRB Transaction”) between VRB Energy and China Energy Storage Industry Co., Ltd. (“Red Sun”), a subsidiary of privately held Shanxi Red Sun Co., Ltd. Following the VRB Transaction, VRB Energy owns a 49% interest in the joint venture (“VRB China Joint Venture”), which manufactures, develops and sells vanadium redox flow batteries for Asian, African and Middle Eastern markets.
VRB Energy is also growing and developing its 100% owned subsidiary, VRB USA, an Arizona-based business focused on the development and manufacture of advanced grid-scale energy storage systems utilizing vanadium redox flow batteries for integration with renewable power sources. VRB USA is currently progressing the build-out of a VRB assembly facility in Mesa, Arizona.
Pursuant to the VRB Transaction, the VRB China Joint Venture was to receive approximately $35.2 million from Red Sun in six tranches by the end of 2025, which was received as of September 30, 2025. In addition, pursuant to the agreement, VRB Energy was due to receive $20 million from Red Sun in two equal tranches, to be completed by June 30, 2025. On February 12, 2025, VRB Energy received the first tranche payment. The second tranche payment is overdue and VRB Energy sent Red Sun a demand letter for prompt payment of the amounts owing and is exploring its options for recourse.
The current commercial platform of both VRB China Joint Venture and VRB USA is the Third Generation Vanadium Redox Battery Energy Storage System (“Gen3 VRB-ESS”). The Gen3 VRB-ESS is a commercially validated system that presents a superior solution for grid-scale utility storage compared to existing lithium-ion batteries. We believe VRB-ESS® batteries deliver better levelized cost of storage with superior safety characteristics compared to lithium-ion battery systems. In 2023 VRB’s 1MW power module and 60kW cell stacks were certified to Underwriters Laboratories (“UL”) UL1973 product safety standards. UL 1973 is recognized as a global standard for commercially available battery energy storage.
The growing demand for renewable energy sources and for systems that can be developed quickly in response to rising demand from datacenters and large commercial and industrial customers is expected to drive the demand for long-duration, long-lasting, safe and reliable vanadium flow batteries as a superior solution to lithium-ion batteries for grid scale energy storage. We believe VRB-ESS® batteries are well-positioned to meet this growing demand as they can be charged and discharged over an almost unlimited number of cycles without wearing out and causing deterioration of the vanadium electrolyte, providing the lowest lifecycle cost of energy of any type of grid scale energy storage. In addition, VRB Energy’s proprietary water-based electrolyte is non-flammable and 100% reusable, presenting a safe solution for customers.
Figure: VRB-ESS® System Overview
Environmental, Health, and Safety Matters
We are committed to creating and enforcing a workplace environment that prioritizes the health and safety of our employees and partners, complies with laws and regulations, and establishes leading practices to promote environmental stewardship and responsible operating procedures. As part of that commitment, in 2024 our Board of Directors established a Health, Safety and Environmental Committee and adopted a Health, Safety and Environmental Policy to establish the framework to help us protect the health and safety of our employees and partners, minimize environmental impacts, and conduct business activities with respect and integrity. In 2025, the Health, Safety and Environmental Committee oversaw the Company’s key health, safety, environmental and social policies and related risks, opportunities and matters affecting the Company’s business.
We are required to comply with numerous environmental laws, regulations and permits in connection with exploration, construction and development work for our projects. We are focused on conducting our mining operations in compliance with all applicable laws and regulations.
Human Capital
We promote the health, safety and well-being of our workforce and strive to further strengthen our commitment to promoting an inclusive and diverse workplace. We believe our workforce is the foundation of our success. Our Board of Directors oversees our policies and implementation programs that govern our approach to management of our human capital, with the HS&E and Compensation and Nominating Committees having oversight of human capital matters, including those relating to health and safety, executive recruitment, retention and development, pay equity, and inclusion and diversity.
As of December 31, 2025, Ivanhoe Electric and its subsidiaries had 286 full time employees. We consider our relationship with our employees to be strong. None of our employees are represented by a labor union or party to a collective bargaining agreement.
History
For a full discussion of the general development of the Company’s business, see the Company’s Annual Report on Form 10-K for the year ended December 31, 2024, which is incorporated by reference.
Corporate Information
We were incorporated in the State of Delaware in July 2020. Our principal executive offices are located at 450 E. Rio Salado Parkway, Suite 130, Tempe, Arizona, and our telephone number is (480) 656-5821. Our website address is ivanhoeelectric.com.
Available Information
We make available, free of charge, on our website at ivanhoeelectric.com our annual reports on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K and any amendments to such reports, as soon as reasonably practicable after such reports are electronically filed with, or furnished to, the SEC. We do not incorporate the information on or accessible through our website into this Annual Report, and you should not consider any information on, or that can be accessed through, our website a part of this Annual Report or any other filing we make with the SEC.
All such reports are also available free of charge via EDGAR through the SEC website at www.sec.gov.
Item 1A. Risk Factors
The following risks and uncertainties may have a material and adverse effect on our business, financial condition, results of operations, prospects, or stock price. You should consider these risks and uncertainties carefully, together with all of the other information contained in this Annual Report, including our consolidated financial statements and related notes. The risks and uncertainties described below may not be the only ones we face. If any of the risks or uncertainties we face were to occur, the trading price of our securities could decline, and you may lose all or part of your investment. This Annual Report also contains forward-looking statements that involve risks and uncertainties. Our actual results could differ materially from those anticipated in the forward-looking statements as a result of factors that are described below and elsewhere in this report. See “Cautionary Note Regarding Forward-Looking Statements.”
Risks Related to our Mining Businesses and the Mining Industry
We operate no mines, and the exploration and development of our mineral projects into mines is highly speculative in nature, may be unsuccessful, and may never result in the development of an operating mine.
We operate no mines. Mineral exploration and mine development are highly speculative in nature, involve many uncertainties and risks and are frequently unsuccessful. Few mineral properties which are explored are ultimately developed into producing mines even if mineralization is identified. Most exploration projects do not result in the discovery of commercially mineable Ore deposits, and anticipated levels of recovery of Mineral Resources and mineral reserves, if any, may not be realized, nor may any identified mineral deposit ever be a commercially mineable (or viable) Ore Body which can be legally and economically exploited. Our exploration programs and activities may therefore not result in the discovery, development or production of a commercially viable Ore Body or mine. Currently, the Santa Cruz Copper Project and the Alacrán Project are our only projects with mineral reserves. As previously disclosed, the amended Cordoba agreement sets the outside date for the close on the sale of Cordoba’s remaining 50% of the Alacrán Project to March 10, 2026.
Even if mineralization is discovered, that mineralization may not be economic to mine. Significant time and expenditures are typically required to establish economic mineralization in the form of mineral reserves, to determine processes to extract the metals and, if required, to construct mining, processing, and tailing facilities and obtain the rights to the land and the resources (including capital) required to develop the mining operation. In addition, if we discover mineralization that becomes a mineral reserve, it will take several years to a decade or more from the initial phases of exploration until production is possible. During this time, the economic feasibility of production may change. As a result of these uncertainties, we may not be able to successfully develop a commercially viable producing mine.
Whether developing a producing mine is economically feasible will depend upon numerous additional factors, most of which are beyond our control, including the availability and cost of required development capital and labor, movement in the price of commodities, securing and maintaining title to mining tenements, as well as obtaining all necessary consents, permits and approvals for the development of the mine. The economic feasibility of mine development projects is based upon many factors, including the accuracy of Mineral Resource and Mineral Reserve estimates; metallurgical recoveries; capital and operating costs; government regulations relating to prices, taxes, royalties, land tenure, land use, importing and exporting and environmental protection; and metal prices, which are highly volatile. Development projects are also subject to the successful completion of feasibility studies, issuance of necessary governmental permits and availability of adequate financing. Any of these factors may result in us being unable to successfully develop a commercially viable operating mine, needing to write-off part or all of our investment in our existing properties or needing to acquire additional properties.
We have no history of mineral production and may never engage in mineral production.
Many of our mineral projects are at the exploration stage and have never been mined by us nor have we produced any revenue from mining operations. We also have no operating history upon which to base estimates of future operating costs, capital spending requirements, site remediation or reclamation costs or asset retirement obligations. Our company has no experience in developing or operating a mine. We may never develop and produce minerals from a commercially viable Ore Body or mine.
We have a history of negative operating cash flows and net losses and we may never achieve or sustain profitability.
We have a history of negative operating cash flows and net losses. We expect to continue to incur negative operating cash flows and net losses until such time as one or more of our mineral projects or other businesses generate sufficient revenues to fund our continuing operations. Given our history of negative operating cash flows and net losses, and expected future negative operating cash flows from operating activities and net losses, we expect to fund our continuing operations through the issuance of common stock to the public or other investors.
We may never achieve or sustain profitability. In addition, we may encounter unforeseen expenses, difficulties, complications, delays and other unknown factors that may adversely affect our ability to generate revenues and achieve or sustain profitability. Our failure to achieve or sustain profitability could depress our market value, could impair our ability to execute our business plan, raise capital, explore or develop our mineral projects or continue our operations, and could cause our stockholders to lose all or part of their investment.
The Mineral Resource and Mineral Reserve calculations for our projects are only estimates and may not reflect the amount of minerals that may ultimately be extracted from those projects.
Any figures presented for Mineral Resources or Mineral Reserves in this Annual Report and those which may be presented in the future are and will only be estimates and depend on geological interpretation and statistical inferences or assumptions drawn from drilling and sampling analysis, which might prove to be materially inaccurate. There is a degree of uncertainty attributable to the calculation of Mineral Resources and Mineral Reserves. Until Mineral Resources and Mineral Reserves are actually mined and processed, the quantity of metal and grades are considered as estimates only and the estimated levels of metals contained within such Mineral Resource and Mineral Reserve estimates may not actually be produced.
The estimation of Mineral Resources and Mineral Reserves is a subjective process that is partially dependent upon the judgment of the persons preparing the estimates. The process relies on the quantity and quality of available data and is based on knowledge, mining experience, statistical analysis of drilling results and industry practices. Valid estimates made at a given time may significantly change when new information becomes available. Estimates of Mineral Resources and Mineral Reserves can also be affected by such factors as environmental permitting regulations and requirements, weather, environmental factors, unforeseen technical difficulties, the metallurgy of the mineralization forming the mineral deposit, unusual or unexpected geological formations and work interruptions.
Mineral Resource and Mineral Reserve estimates may change adversely and such changes may negatively impact the viability of developing a mineral project into a mine.
Estimated Mineral Resources and Mineral Reserves may have to be recalculated based on changes in commodity prices, further exploration or development activity, loss or change in permits or actual production experience. Such changes could materially and adversely affect estimates of the volume or grade of mineralization, estimated recovery rates or other important factors that influence Mineral Resource estimates. The extent to which our Mineral Resources may ultimately be reclassified as mineral reserves depends on the demonstration of their profitable recovery and economic mineability.
In addition, Mineral Resource and Mineral Reserve estimates have been determined and valued based on assumed future metal prices, cut-off grades, and capital and operating costs that may prove to be inaccurate. Extended declines in the market price for minerals such as copper, gold, nickel and silver may render portions of our mineralization uneconomic and result in reduced reported volume and grades, which in turn could have a material adverse effect on our financial performance, financial position and results of operations, as well as a reduction in the amount of Mineral Resources or Mineral Reserves. In addition, Inferred Mineral Resources have a great amount of uncertainty as to their existence and their economic and legal feasibility. You should not assume that any part of an Inferred Mineral Resource will be upgraded to a higher category or that any of the Mineral Resources will be reclassified as Mineral Reserves. In addition, it may not be possible to economically mine or process any of our Mineral Resources.
Material changes in Mineral Resources or Mineral Reserves, if any, grades, stripping ratios or Recovery Rates may affect the economic viability of any project. Our future growth and productivity will depend, in part, on our ability to successfully develop and maintain commercially mineable mineral deposits at our existing properties or identify and
acquire other commercially mineable mineral deposits, as well as on the costs of and results of continued exploration and potential development programs at our mineral projects.
Lack of reliability and inaccuracies of historical information could hinder our exploration plans.
We have relied on, and some disclosure in our technical reports is based, in part, upon historical data compiled by previous parties involved with our mining projects. To the extent that any such historical data is inaccurate or incomplete, our exploration plans may be adversely affected.
The prices of the minerals for which we are principally exploring change on a daily basis, and a substantial or extended decline in the prices of these minerals could materially and adversely affect our ability to raise capital, conduct exploration activities, and develop or operate a mine.
Our business and financial performance will be significantly affected by fluctuations in the prices of the key minerals we are principally exploring for (copper, nickel, gold, cobalt, platinum group elements, and silver). The prices of these minerals are volatile, can fluctuate substantially, and are affected by numerous factors that are beyond our control, including prevailing interest rates and returns on other asset classes; expectations regarding inflation, monetary policy and currency values; speculative activities; governmental and foreign exchange rate decisions; decisions regarding the creation and disposal of mineral stockpiles; political and economic conditions; structural changes in demand including electrification; the availability and costs of metal substitutes; the location and the demand for products containing these key minerals; technological changes and changes in industrial processes, as well as economic slow-downs or recessions.
We cannot predict the effect of these factors on mineral prices. Significant and/or prolonged reductions in prices for these minerals would materially and adversely affect our ability to raise capital, and if not considered viable for exploration activities, would cause us to delay, halt or stop exploration and development activities altogether. If we are operating a producing mine at the time of such a reduction in prices, we would expect to suffer decreasing revenues and profitability which could materially and adversely affect our results of operations and financial condition and may cause us to suspend or cease mining operations.
Significant and/or prolonged increase in prices for these minerals may decrease the demand for these minerals and increase the demand for substitute minerals. A fall in demand could also decrease the price for these minerals, thereby reducing the attractiveness of conducting exploration activities for these minerals. A fall in demand may also adversely affect our ability to raise capital and develop or operate a mine. In addition, an increase in worldwide supply, and consequent downward pressure on prices, may result over the longer term from increased mineral production from mines developed or expanded as a result of current metal price levels.
Title to surface and mineral rights within some of our projects may be uncertain or defective, and for certain of our projects, we do not own all of the mineral or surface rights
At certain of our projects we only own some of the mineral and surface rights. At the Tintic Project, the rights we do not own are held under option agreements or purchase agreements in respect of which title has not yet transferred to us. At the Tintic Project, five vendors continue to hold title to the remaining subsurface and surface rights, pending us making all required payments within the time required. At Hog Heaven, the project is subject to an option to earn-in agreement with Brixton metals, and certain parcels on the project have surface and mineral rights under lease from other private parties. At Gleeson, we have four leases with option to purchase, and at the Globe-Miami and Lomitas Negras projects, we have option agreements with the right to acquire 100% of the projects over an eight-year option period by making annual payments and exploration expenditures. If we do not make all the option or purchase agreement payments when due, or fail to pay the total amount to the owners, we will lose our right to acquire the subsurface mineral or surface rights at these projects.
At times, the owners of mineral and surface rights may be unable or unwilling to fulfill their contractual obligations to us. In addition, our option agreements and purchase agreements are often complex and may be subject to interpretation or uncertainties. The owners of mineral and surface rights and other counterparties may interpret our interests in a manner adverse to us. For these or other reasons, we could be forced to expend resources or take legal action to enforce our contractual rights. We may not be successful in enforcing our contractual rights. We may also need to expend significant monetary and human resources to defend our position. Such disputes to enforce our contractual rights could have adverse effects on our business, results of operations and financial condition.
Title to our properties may also be challenged, and we may not have, or may not be able to obtain, all necessary surface rights to develop a property. An unknown title defect on any of our mineral projects (or any portion thereof) could adversely affect our ability to explore, develop and/or mine the projects and/or process the minerals that we mine in the future. In addition to termination, failure to make timely tenement maintenance payments and otherwise comply with applicable laws, regulations and local practices relating to mineral right applications and tenure could result in reduction or expropriation of entitlements.
Our indebtedness and grant of security interests in certain of our assets could adversely affect our business.
We have incurred indebtedness and may incur further indebtedness from time to time, which may be secured, including the Deed of Trust in connection with the credit facility we entered into with a banking syndicate comprised of National Bank of Canada, Societe Generale and Bank of Montreal Many of our mineral properties are in the exploration stage and we have no sources of revenue from which to pay indebtedness until they commence production. If we are unable to pay existing or future indebtedness when due, the holders will have rights against us, and in the case of secured indebtedness, the holders may potentially seize or sell the assets subject to the security interest. Any failure to timely meet our obligations under these instruments may adversely affect our assets, results of operations and future prospects.
Actual capital costs, operating costs, production and economic returns may differ significantly from those we have anticipated and future development activities may not result in profitable mining operations.
The actual operating costs at any mineral project that we are able to develop into an operating mine will depend upon changes in the availability and prices of labor, equipment and infrastructure, general inflation in the economy, variances in Ore recovery and mining rates from those assumed in any mining plan that may be generated, operational risks, changes in governmental regulation, including taxation, environmental, permitting and other regulations and other factors, many of which are beyond our control. Due to any of these or other factors, the operating costs at the Santa Cruz Copper Project or other projects may be significantly higher than those set forth in the PFS or any other Pre-Feasibility or Feasibility Study that we may ultimately prepare and use as a basis for construction of a mine. As a result of higher capital and operating costs, production and economic returns may differ significantly from those set forth in such studies and any future development activities may not result in profitable mining operations.
We are or will be required to obtain, maintain and renew environmental, construction and mining permits, which is often a costly and time-consuming process and ultimately may not be possible to achieve.
Mineral exploration and mining companies, including ours, need many environmental, construction and mining permits, each of which can be time-consuming and costly to obtain, maintain and renew, and which become more numerous as activities advance from exploration to mine development and construction and finally to mining operations. To obtain, maintain and renew certain permits, we have been and may in the future be required to conduct environmental studies, and make associated presentations to governmental authorities pertaining to the potential impact of our current and future activities upon the environment and to take steps to avoid or mitigate those impacts. Permit terms and conditions can impose restrictions on how we conduct our activities and limit our flexibility in exploring our mineral projects and in how we may develop them into mines in the future.
Many of our permits are subject to renewal from time to time, and applications for renewal may be denied or the renewed permits may contain more restrictive conditions than our existing permits, including those governing impacts on the environment. We may be required to obtain new permits to expand our activities, and the grant of such permits may be subject to an expansive governmental review of our operations.
We may not be successful in obtaining all such permits, which could prevent us from commencing, continuing or expanding operations or otherwise adversely affect our business. Renewal of existing permits or obtaining new permits may be more difficult if we are not able to comply with our existing permits. Applications for permits, permit area expansions and permit renewals can also be subject to challenge by interested parties, which can delay or prevent receipt of needed permits. The permitting process can vary by jurisdiction in terms of its complexity and likely outcomes. The applicable laws and regulations, and the related judicial interpretations and enforcement policies change frequently, which can make it difficult for us to obtain and renew permits and to comply with applicable requirements. Accordingly, permits required for our activities may not be issued, maintained or renewed in a timely fashion or at all, may be issued or renewed upon conditions that restrict our ability to conduct our operations economically, or may be subsequently revoked. Any such
failure to obtain, maintain or renew permits, or other permitting delays or conditions, including in connection with any environmental impact analyses, could have a material adverse effect on our business, results of operations and financial condition.
We are subject to environmental and health and safety laws, regulations and permits that may subject us to material costs, liabilities and obligations, including land reclamation and exploration restoration requirements.
We are subject to environmental, health and safety laws, regulations and permits in the various jurisdictions in which we operate, including those relating to, among other things, the removal and extraction of natural resources, the emission and discharge of materials into the environment, including plant and wildlife protection, remediation of soil and groundwater contamination, reclamation and closure of properties, including tailings and waste storage facilities, groundwater quality and availability, and the handling, storage, transport and disposal of wastes and hazardous materials. Failure to comply with these environmental, health and safety requirements may expose us to litigation, fines or other sanctions, including the revocation of permits and suspension of operations. We expect to continue to incur significant capital and other compliance costs related to such requirements. These laws, regulations and permits, and the enforcement and interpretation thereof, change frequently and generally have become more stringent over time. If our noncompliance with such regulations were to result in a release of hazardous materials into the environment, such as soil or groundwater, we could be required to remediate such contamination, which could be costly. Moreover, noncompliance could subject us to private claims for property damage or personal injury based on exposure to hazardous materials or unsafe working conditions. In addition, changes in applicable requirements or stricter interpretation of existing requirements may result in costly compliance requirements or otherwise subject us to future liabilities. The occurrence of any of the foregoing, as well as any new environmental, health and safety laws and regulations applicable to our business or stricter interpretation or enforcement of existing laws and regulations, could have a material adverse effect on our business, prospects, financial condition and results of operations.
We also could be liable for any environmental contamination at, under or released from our or our predecessors’ currently or formerly owned or operated properties or third-party waste disposal sites. Certain environmental laws impose joint and several strict liability for releases of hazardous substances at such properties or sites, without regard to fault or the legality of the original conduct. A generator of waste can be held responsible for contamination resulting from the treatment or disposal of such waste at any off-site location (such as a landfill), regardless of whether the generator arranged for the treatment or disposal of the waste in compliance with applicable laws. Costs associated with liability for removal or remediation of contamination or damage to natural resources could be substantial and liability under these laws may attach without regard to whether the responsible party knew of, or was responsible for, the presence of the contaminants. Accordingly, we may be held responsible for more than our share of the contamination or other damages, up to and including the entire amount of such damages. In addition to potentially significant investigation and remediation costs, such matters can give rise to claims from governmental authorities and other third parties, including for orders, inspections, fines or penalties, natural resource damages, personal injury, property damage, toxic torts and other damages.
Our costs, liabilities and obligations relating to environmental matters could have a material adverse effect on our business, financial position and results of operations.
Our future capital and operating cost estimates at any of our mining projects may not be accurate.
The capital and operating cost estimates we may make in respect of our mineral projects that we intend to develop or ultimately develop into operating mines may not prove to be accurate. Capital and operating cost estimates are typically set out in Pre-Feasibility or Feasibility Studies and are based on the interpretation of geological data, cost of consumables, cost of capital, labor costs, transportation costs, mining and processing costs, anticipated climatic conditions, the costs of taxes, duties and royalties, permitting and restrictions or production quotas on exportation of minerals) and title claims, and other factors which may be considered at the time the estimates are made and will be based on information prevailing at that time. Any of the following events, among the other uncertainties and risks described in this Annual Report, could affect the ultimate accuracy of such estimates:
•unanticipated changes in grade and tonnage of Ore to be mined and processed;
•incorrect data on which engineering assumptions are made;
•delays in construction schedules;
•delays in the ramp-up of the rate of operations;
•unanticipated transportation costs;
•the accuracy of major equipment and construction cost estimates;
•labor negotiations and labor availability;
•changes in government regulation, including regulations regarding greenhouse gas emissions;
•changes in the cost of consumables;
•changes in the general rate of inflation in the economy;
•changes in royalty, duty, and tax rates;
•permitting costs and requirements; and
•general demand for skilled labor, steel, cement, industrial equipment and other components required for mining, any of which could cause material and adverse changes to our future capital and operating costs.
We may face opposition from organizations that oppose mining which may disrupt or delay our mining projects.
There is an increasing level of public concern relating to the effects of both mineral exploration and mining on the natural landscape, in communities and on the environment. Certain non-governmental organizations, community groups, public interest groups and reporting organizations (“NGOs”) that oppose resource development are vocal critics of the mining industry. In addition, there have been many instances in which local community groups have opposed resource extraction activities, which have resulted in disruption and delays to the relevant operation, and in some cases halted development altogether. NGOs or local community organizations could direct adverse publicity against and/or disrupt and/or halt our operations in respect of one or more of our mineral properties regardless of our successful compliance with social and environmental best practices, due to political factors, activities of unrelated third parties on lands in which we have an interest, or our operations specifically. Any such actions and the resulting media coverage could have an adverse effect on our reputation and financial condition or our relationships with the communities in which we operate, which could have a material adverse effect on our business, prospects, financial condition or results of operations.
Our operations involve significant risks and hazards inherent to the mining industry.
Our operations involve the operation of large machines, heavy mobile equipment and drilling equipment. Hazards such as adverse environmental conditions, unusual or unexpected geological formations, metallurgical and other processing problems, industrial accidents, cave-ins, mechanical equipment failure, facility performance problems, fire and natural phenomena such as inclement weather conditions, excessive heat, floods, landslides and earthquakes are inherent risks in our activities. These hazards inherent to the mining industry can cause injuries or death to employees, contractors or other persons at our mineral projects, severe damage to and destruction of our property, plant and equipment, and contamination of, or damage to, the environment, and can result in the suspension of our exploration activities and future development and mine production activities. The occurrence of any of these events may delay, prevent, hinder or stop exploration and development activities altogether on any mineral project, and once in operation may cause mining activities to be suspended or cease altogether.
In addition, from time to time we may be subject to governmental investigations and claims and litigation filed on behalf of persons who are harmed while at our properties or otherwise in connection with our activities. To the extent that we are subject to personal injury or other claims or lawsuits in the future, it may not be possible to predict the ultimate outcome of these claims and lawsuits due to the nature of personal injury litigation. Similarly, if we are subject to governmental investigations or proceedings, we may incur significant penalties and fines, and enforcement actions against us could result in our being required to stop exploration and development activities or to close future mining operations. If claims and lawsuits or governmental investigations or proceedings are ultimately resolved against us, it could have a material adverse effect on our business, financial position and results of operations.
A significant portion of any future mining revenue from our operations is expected to come from a small number of mines.
If and when we begin generating revenue from future mining operations, a significant portion of our revenue is expected to come from a small number of mines or even a single mine, which means that adverse developments at these properties could have a more significant or lasting impact on our results of operations than if our revenue was less concentrated.
Joint ventures and other partnerships in relation to our properties may expose us to risks.
We have in the past entered into, are currently party to, and may in the future enter into, joint ventures or similar arrangements, such as our current joint ventures and collaborations with Maaden, SQM, BHP, Sama, and Red Sun, or other arrangements with parties in relation to the exploration, development, and production of certain of the properties in which we have an interest. Joint ventures may allow our joint venture partners to take important actions without our approval or may require unanimous approval of the parties to the joint venture or their representatives for certain fundamental decisions, such as budgeting and capital expenditures, an increase or reduction of registered capital, merger, division, dissolution, amendments of constating documents, enforcement of intellectual property, litigation, the disposition of joint venture assets, and the pledge of joint venture assets, which means that each joint venture party may have a veto right with respect to such decisions, which could lead to a deadlock in the operations of the joint venture or partnership or our joint venture partner may be able to take actions with which we disagree. We may be unable to exert control over strategic decisions made in respect of such joint ventures or similar arrangements. Joint ventures and similar arrangements may also impose financial, operational and other requirements on each of the parties. Any failure of us or such other companies to meet our and their respective obligations or to provide additional funding when required, or any disputes with respect to the parties’ respective rights and obligations, could have a material adverse effect on the joint ventures or their business and, therefore, could have a material adverse effect on our results of operations, financial performance, cash flows and the price of our common stock.
We operate in a highly competitive industry.
The mining industry is highly competitive. Much of our competition is from larger, established mining companies with greater liquidity, greater access to credit and other financial resources, newer or more efficient equipment, lower cost structures, more effective risk management policies, more staff and equipment, and procedures and/or a greater ability than us to withstand losses. We also face competition from smaller mining companies looking to stake or acquire prospective mineral properties that we may also be seeking to acquire. Our competitors may be able to respond more quickly to new laws or regulations or emerging technologies, or devote greater resources to the expansion or efficiency of their operations than we can, or expend greater amounts of resources, including capital, in acquiring new and prospective mining projects. In addition, current and potential competitors may make strategic acquisitions or establish cooperative relationships among themselves or with third parties. Accordingly, it is possible that new competitors or alliances among current and new competitors may emerge and gain new or prospective properties or mines or significant market share to our detriment. We may not be able to compete successfully against current and future competitors, and any failure to do so could have a material adverse effect on our business, financial condition or results of operations.
Increases in demand for, and cost of, exploration, development and construction services and equipment may have a material adverse effect on our business.
The relative strength of metal prices in past years has encouraged increases in mineral exploration, development and construction activities around the world, which has resulted in increased demand for, and cost of, exploration, development and construction services and equipment. Increased demand for, and cost of, services and equipment could result in delays if services or equipment cannot be obtained in a timely manner due to inadequate availability, and may cause scheduling difficulties due to the need to coordinate the availability of services or equipment, any of which could materially increase project exploration, development and/or construction costs or could result in material delays or other operational challenges.
Failure to make mandatory payments required under earn-in, option and similar arrangements related to mineral projects may result in a loss of our opportunity and/or right to acquire an interest in such mineral projects.
We have interests in, or rights to acquire interests in, a number of mineral projects through earn-in arrangements, options and similar agreements with the owner of the mineral project. These arrangements typically require us to commit to meet certain expenditure requirements on the mineral project and/or to pay certain fees to the mineral project owner, each within specified time frames. If we comply with the terms of such arrangements and make the required payments within the time periods required, we would then earn an interest in the project directly or in an entity that holds the legal title to the mineral project. Such arrangements are common in the mining industry and are often staged, with the company that is earning-in, earning an interest in the project at various stages and over various timeframes, resulting in a joint venture arrangement with the company that is the owner of the mineral project, or in some cases could result in the outright acquisition of the project from its owner.
If we do not make the required expenditures when contractually agreed, and if such failure occurs before earning any interest in a project, or if we otherwise fail to comply with the terms of such agreements, we may lose all of the expenditures and payments made to that time in respect of that mineral project and acquire no interest in such mineral project. If we do not make the required expenditures when contractually agreed after we have earned some interest in the project, we may lose the right to acquire any further interest and may be left with a minority interest in a mineral project that provides us with limited or few rights with respect to the exploration and development of that mineral project, and which may have limited resale value to a third party. Any such failure or occurrence could materially and adversely affect our business, financial condition, results of operations or prospects and may result in us forfeiting our right to acquire an interest, or a further interest, in mineral projects that may ultimately be determined to be viable commercial mining operations.
Suitable infrastructure may not be available for exploration or development of mineral properties or damage to existing infrastructure may occur.
Mining, processing, development and exploration activities depend on adequate infrastructure. Reliable roads, bridges, port and/or rail transportation, power sources, water supply and access to key consumables are important determinants for capital and operating costs. The lack of availability on acceptable terms or the delay in the availability of any one or more of these items could prevent or delay exploration, development or exploitation of our mineral projects. If adequate infrastructure is not available, the future mining or development of our projects may not be commenced or completed on a timely basis, or at all, the resulting operations may not achieve the anticipated production volume, and the construction costs and operating costs associated with the mining and/or development of our projects may be higher than anticipated. Shortages of water supply, critical spare parts, maintenance service and new equipment and machinery may materially and adversely affect our operations and development projects.
The presence or lack of water may adversely affect our future mining operations.
Any future mines that we develop will require the use of significant quantities of water for mining activities, processing and related auxiliary facilities. Water usage, including extraction, containment and recycling requires appropriate permits granted by governmental authorities.
In particular, many of our mineral projects are in the south-western portions of the United States, an area that has suffered from prolonged drought, dwindling water resources and growing conflict over the use of water resources. Our mining projects, if developed into operating mines, may not be able to source all the water needed for mining operations, and governments or regulatory authorities may determine to prioritize other commercial or industrial activities ahead of mining in the use of water.
Water may not be available in sufficient quantities to meet our future production needs and may not prove sufficient to meet our water supply needs. In addition, necessary water rights may not be granted and/or maintained. A reduction in our water supply could materially and adversely affect our business, results of operations and financial condition. This and we have not yet obtained the water rights to support some of our potential development activities and our inability to obtain those rights could prevent us from pursuing those activities.
As well, underground mining operations often encounter groundwater and aquifers that complicate the development and operation of underground mines, including at the Santa Cruz Copper Project. The presence of such water often requires additional engineering and capital to safely develop the mine and to subsequently extract Ore from areas of water ingress and/or dewatering operations, which increases both the capital and operating costs of underground mine development and operation. The presence of water may therefore materially and adversely affect the costs of development and operating a mine.
An increase in prices of power and water supplies, including infrastructure, could negatively affect our future operating costs, financial condition, and ability to develop and operate a mine.
Our ability to obtain a secure supply of power and water at a reasonable cost at our mineral projects depends on many factors, including: global and regional supply and demand; political and economic conditions; problems that can affect local supplies; delivery; infrastructure, weather and climate conditions; and relevant regulatory regimes, all of which are outside our control. We may not be able to obtain secure and sufficient supplies of power and water at reasonable costs at
any of our mineral projects and the failure to do so could have a material adverse effect on our ability to develop and operate a mine, and on our financial condition and results of operations.
Our success depends on developing and maintaining relationships with local communities and stakeholders.
Our ongoing and future success depends on developing and maintaining productive relationships with the communities surrounding our mineral projects, including local indigenous people who may have rights or may assert rights to certain of our properties, and other stakeholders in our operating locations. Local communities and stakeholders may be dissatisfied with our activities or the level of benefits provided, which may result in legal or administrative proceedings, civil unrest, protests, direct action or campaigns against us. Any such occurrence could materially and adversely affect our business, financial condition or results of operations, as well as our ability to commence or continue exploration or mine development activities.
The impacts of climate change may adversely affect our operations and/or result in increased costs to comply with changes in regulations.
Climate change is an international and community concern which may directly or indirectly affect our business and current and future activities. The continuing rise in global average temperatures has created varying changes to regional climates across the world and extreme weather events have the potential to delay or hinder our exploration activities at our mineral projects, and to delay or cease operations at any future mine. This may require us to make additional expenditures to mitigate the impact of such events which may materially and adversely increase our costs and/or reduce production at a future mine. Governments at all levels are amending or enacting additional legislation to address climate change by regulating, among other things, carbon emissions and energy efficiency, or where legislation has already been enacted, regulation regarding emission levels and energy efficiency are becoming more stringent. As a significant emitter of greenhouse gas emissions, the mining industry is particularly exposed to such regulations. Compliance with such legislation, including the associated costs, may have a material adverse effect on our business, financial condition, results of operations, prospects and our ability to commence or continue our exploration and future development and mining operations.
Changing climate patterns may also affect the availability of water. If the effects of climate change cause prolonged disruption in the delivery of essential commodities then production efficiency may be reduced, which may have a material adverse effect on our business, financial condition, results of operations and prospects.
In addition, climate change is perceived as a threat to communities and governments globally and stakeholders may demand reductions in emissions or call upon mining companies to better manage their consumption of climate-relevant resources. Negative social and reputational attention toward our operations may have a material adverse effect on our business, financial condition, results of operations and prospects. A number of governments have already introduced or are moving to introduce climate change legislation and treaties at the international, national, state/provincial and local levels. Regulations relating to emission levels (such as carbon taxes) and energy efficiency are becoming more stringent. If the current regulatory trend continues, this may result in increased costs at some or all of our mineral projects
Our subsidiary, Cordoba, is involved in lengthy litigation, which may adversely affect the value of our investment in it and its mineral projects.
Our subsidiary, Cordoba, is currently involved in two legal proceedings. The first is a criminal lawsuit filed by Cordoba in late 2018 and in January 2019 with the Colombian prosecutors against nine members of former Colombian management of a Cordoba subsidiary alleging breach of fiduciary obligations, abuse of trust, theft and fraud. This proceeding is ongoing. In the second proceeding, Cordoba (along with the National Mining Agency, Ministry of Mines and Energy, the local environmental authority, the Municipality of Puerto Libertador and the State of Cordoba) were served with a class action claim by individuals purporting to represent the Alacran Community — “Asociación de Mineros de El Alacrán” (“Alacran Community”). This class action seeks (i) an injunction against Cordoba´s operations in the Alacrán area and (ii) an injunction against the prior declaration by the authorities that the Alacran Community´s mining activities were illegal. The claim was initially filed with the Administrative Court of Medellín, which remanded the case to the Administrative Court of Montería, which contested it and submitted the case to the Council of State. The Council of State determined the Administrative Court of Montería as the competent tribunal, where the process is currently being conducted. The Administrative Court of Montería admitted the commencement of the class action on September 2021. The decision was challenged by Cordoba and other defendants and confirmed by the Court. Cordoba timely filed its: (i) response to the lawsuit and statement of defense; and (ii) opposition to the injunction requested by plaintiffs. The Court now should: (i) issue a decision on the injunction; and (ii) schedule date and time for the initial hearing. While the court
matters proceed, Cordoba will incur additional costs that will negatively impact its financial position. The litigation process is uncertain and it is possible that the second proceeding is resolved against Cordoba, which could have a material adverse effect on its business, results of operations, financial condition and prospects.
RISKS RELATED TO OUR VANADIUM BATTERY BUSINESSES
Our Vanadium battery businesses may be unable to obtain sufficient suitable feedstock for future vanadium electrolyte production and/or may be unable to find suppliers of vanadium electrolyte at cost effective prices.
Our vanadium battery businesses currently purchase certain key raw materials, such as feedstock, for our electrodes and a variety of other components from a limited number of third parties. Our current suppliers may be unable to satisfy our future requirements on a timely basis or at all. Moreover, the price and quality of purchased raw materials, including vanadium electrolyte, components and assembled batteries could fluctuate significantly due to circumstances beyond our control. If we fail to secure a sufficient supply of key raw materials and components and we are unable to produce them in-house in a timely fashion, it could result in a significant delay in our manufacturing and shipments, which may cause us to breach our sales contracts with our customers. If we are unable to source vanadium electrolyte at cost effective prices the willingness of customers to purchase our vanadium batteries may be limited. Furthermore, failure to obtain sufficient supply of these raw materials and components or produce them in-house at a reasonable cost could also harm our revenue and gross profit margins.
Developments in alternative technology may adversely affect the demand for vanadium battery products.
Significant developments in alternative energy storage technologies, such as fuel cell technology, advanced diesel, coal, ethanol or natural gas, or breathing batteries, may materially and adversely affect our business, prospects, financial condition and operating results in ways that we may not currently anticipate. Existing and other battery technologies, fuels or sources of energy may emerge as customers’ preferred alternatives to our battery products. Any failure by us to develop new or enhanced technologies or processes, or to react to changes in existing technologies, could materially delay our development and introduction of new and enhanced alternative products, which could result in decreased revenue and a loss of market share to our competitors. Our research and development efforts may not be sufficient to adapt to changes in alternative technology and we may not compete effectively with alternative systems if we are not able to source and integrate the latest technology into our battery products.
Our vanadium battery businesses may experience significant delays in the design, production and launch of its battery projects, which could harm our business, prospects, financial condition and operating results.
Our vanadium battery businesses’ research and development team is continually looking to improve its battery systems. Any delay in the financing, design, production and launch of new products could materially damage our brand, business, prospects, financial condition and operating results. There are often delays in the design, production and commercial release of new products, and to the extent we delay the launch because of the items identified above, our growth prospects could be adversely affected as we may fail to grow our market share, to keep up with competing products or to satisfy customers’ demands or needs.
Our vanadium battery businesses may be adversely affected by any technical limitations in our software and hardware systems
Our vanadium batteries rely on software and hardware, including software and hardware developed or maintained internally or by third parties that is highly technical and complex and will require modification and updates over the life of a battery. In addition, certain of our products depend on the ability of such software and hardware to store, retrieve, process and manage immense amounts of data. Our software and hardware may contain errors, bugs or vulnerabilities, and our systems are subject to certain technical limitations that may compromise our ability to meet the objectives. Some errors, bugs or vulnerabilities inherently may be difficult to detect and may only be discovered after the code has been released for external or internal use. Errors, bugs, vulnerabilities, design defects or technical limitations may be found within our software and hardware. Remediation efforts may not be timely, may hamper production, or may not be to the satisfaction of our customers. If we are unable to prevent or effectively remedy errors, bugs, vulnerabilities or defects in our software and hardware, we may suffer damage to our brand, loss of customers, loss of revenue or liability for damages, any of which could adversely affect our business and financial results.
Our vanadium battery joint venture in the People’s Republic of China (“PRC”) may be negatively impacted by laws and policies of the Government of the PRC or the state of PRC-United States relations.
A deterioration in the United States-PRC relationship, which may be evidenced by tariff and non-tariff barriers, lack of advancement on trade negotiations, domestic “buy local” policies, lack of business travel and business contact, and potentially sanctions or other barriers to commerce, may negatively affect our vanadium battery joint venture, business prospects, results of operations and cash flows. The joint venture also helps our United States business source equipment and components in China that are used in the United States. An increase in tariff and non-tariff barriers may significantly increase the cost of such equipment and components, or may prohibit their importation into the United States altogether. If we are unable to obtain such equipment and components at cost effective prices, our ability to assemble and sell vanadium batteries in the United States may be materially and adversely affected.
There is no assurance that Red Sun will satisfy its payment obligations to us in full or in a timely manner.
Pursuant to the VRB Transaction, we, through VRB Energy, are entitled to receive $20 million in cash from Red Sun payable in two equal tranches, which we plan to use for the growth and advancement of VRB USA. The first tranche payment was received, but the second tranche payment, which was payable by June 30, 2025, is overdue and VRB Energy sent a demand letter and is pursuing options for recourse. There can be no assurance that Red Sun will satisfy its remaining payment obligations to us in full or in a timely manner. Any delay, reduction or failure to make these payments would have an adverse effect on our plans for VRB USA, including our ability to advance the development of a manufacturing facility in the USA by VRB USA.
There is no guarantee that the sale transaction will close or the payment due under the agreement for the sale of Cordoba’s remaining interest in the Alacran Copper Project will be received.
Cordoba, our publicly listed and approximately 60.8% owned subsidiary, entered into an agreement to sell certain assets indirectly constituting Cordoba’s remaining 50% interest in the Alacran Copper Project, related exploration properties, and certain intercompany receivables, for consideration of $128 million. The closing of the transaction remains subject to conditions, including the receipt of JCHX shareholder approval. No assurance can be provided that the transaction will close and that we will receive the anticipated proceeds thereof.
RISKS RELATED TO INTELLECTUAL PROPERTY
If we are unable to successfully obtain, maintain, protect, enforce or otherwise manage our intellectual property and proprietary rights, we may incur significant expenses and our business may be adversely affected.
Our success and ability to compete depends in part upon the proprietary nature of, and protection for, our products, technologies, processes and know-how.
The TyphoonTM technology we utilize in our exploration activities is based on patents owned by our subsidiary Geo27. In addition, we are also the exclusive worldwide licensee of certain legacy technology from I-Pulse and its affiliates, related to mineral exploration. Any failure by us or our licensor to establish, protect and enforce our intellectual property rights could have a material adverse effect on our business, prospects, financial condition, results of operations and cash flows, as would any breach by the licensor of our license agreements.
In addition, our vanadium battery businesses rely on patents to establish and protect its intellectual property rights in the PRC, the United States and other jurisdictions. As a result, our vanadium battery businesses may be required to spend significant resources to monitor and protect their intellectual property rights. Litigation brought to protect and enforce its intellectual property rights could be costly, time-consuming and distracting to management and could result in the impairment or loss of portions of its intellectual property. Furthermore, efforts to enforce intellectual property rights may be met with defenses, counterclaims and countersuits attacking the validity and enforceability of its intellectual property rights. In addition, competitors to our vanadium battery businesses may develop similar products that do not conflict with the vanadium battery businesses’ intellectual property rights, may design around their intellectual property rights or may independently develop similar or superior technology. Failure to establish, protect and enforce the intellectual property rights owned by the vanadium battery businesses could have a material adverse effect on our business, prospects, financial condition, results of operations and cash flows.
We may be exposed to infringement or misappropriation claims by third parties, which, if determined adversely to us, could cause us to lose significant rights and to be unable to continue providing our existing product offerings.
Our success also depends largely on our ability to use and develop our technology and know-how without infringing the intellectual property rights of third parties. The validity and scope of claims relating to vanadium-based battery technology and TyphoonTM technology patents involve complex scientific, legal and factual questions and analysis and, therefore, may be highly uncertain, expensive and time-consuming. We may receive in the future notices that claim we or our customers using our products have misappropriated or misused other parties’ intellectual property rights, particularly as the number of competitors in our market grows and the functionality of products among competitors overlaps. If we are sued by a third party that claims that our technology infringes its rights, the litigation, whether or not successful, could be extremely costly to defend, divert our management’s time, attention, and resources, damage our reputation and brand and substantially harm our business. Further, in some instances, our agreements with our customers include indemnification provisions under which we or our subsidiaries agree to indemnify such parties for losses suffered or incurred in connection with third party claims for intellectual property infringement. The results of any intellectual property litigation to which we might become a party, or for which we are required to provide indemnification, may also require us to do one or more of the following:
•cease offering or using technologies that incorporate the challenged intellectual property;
•make substantial payments for legal fees, settlement payments or other costs or damages to the party claiming infringement, misappropriation or other violation of intellectual property rights;
•obtain a license to sell or use the relevant technology, which may not be available on reasonable terms or at all; or
•redesign technology to avoid infringement, which may not be feasible.
Our failure to develop non-infringing technologies or license the intellectual property or the proprietary rights on a timely basis would harm our business, possibly materially. Protracted litigation could result in our customers, or potential customers, deferring or limiting their purchase or use of our products until resolution of such litigation. Parties making the infringement claim may also obtain an injunction that can prevent us from selling our products or using technology that contains the allegedly infringing materials. If we were to discover that our products violate third-party proprietary rights, we may be unable to continue offering our products on commercially reasonable terms, or at all, to redesign our technology to avoid infringement or to avoid or settle litigation regarding alleged infringement without substantial expense and damage awards. Any intellectual property litigation or proceeding could have a material adverse effect on our business, results of operation and financial condition.
RISKS RELATED TO OUR BUSINESSES GENERALLY
We will require substantial capital investment in the future, and our inability to raise adequate capital could affect our ability to continue as a going concern.
We will require significant funding to continue our operations and advance our projects through exploration, the construction and operation of potential future mines. Our ability to raise additional capital, on timely and favorable terms or at all, will depend on various factors, including macroeconomic conditions, future commodity prices, our exploration success, and market conditions. If these factors deteriorate, our ability to raise capital to fund ongoing operations and business activities could be significantly impacted. If we cannot obtain adequate additional financing, we may have to substantially curtail our exploration and development activities or sell assets, which could materially and adversely affect our business plan. Inadequate financial resources could also raise substantial doubt about our ability to continue as a going concern.
Currency fluctuations may affect our results of operation and financial condition.
We pay for goods and services in a number of currencies, including the United States dollar, the Canadian dollar and other currencies. We also raise capital in United States dollars. Adverse fluctuations in these currencies relative to each other and relative to the currencies in which we incur expenditures could materially and adversely affect our financial position and the costs of our exploration and development activities. We do not engage in currency or commodity hedging activities.
Our insurance may not provide adequate coverage in the event of a loss.
Our business and activities are subject to a number of risks and hazards, including, but not limited to, adverse environmental conditions, metallurgical and other processing problems, industrial accidents, labor disputes, unusual or unexpected geological conditions, ground control problems, cave-ins, changes in the regulatory environment, mechanical equipment failure, facility performance problems, fires and natural phenomena such as inclement weather conditions, floods, landslides and earthquakes, and defective title. These risks could result in damage to, or destruction of, our mineral properties or production facilities, personal injury or death, environmental damage, delays in exploration, mining or processing, increased production costs, asset write downs, monetary losses and legal liability.
Our property and liability insurance may not provide sufficient coverage for losses related to these or other hazards. Insurance against certain risks, including those related to defective title, environmental matters or other hazards resulting from exploration and production, is generally not available to us or to other companies within the mining industry. Our current insurance coverage may not continue to be available at economically feasible premiums, or at all. In addition, we do not carry business interruption insurance relating to our properties. Any losses from these events may cause us to incur significant costs that could have a material adverse effect on our business, financial position and results of operations.
We are dependent on the leadership of our executive management team and key employees.
Our exploration activities and any future mine development, as well as the construction and operation of a mine depend to a significant extent on the continued service and performance of the executive management team. We depend on a relatively small number of key officers and consultants, and we currently do not have, and do not intend to, purchase key-person insurance for these individuals. Departures by our executive management team could have a negative impact on our business, as we may not be able to find suitable personnel to replace departing management on a timely basis, or at all. The loss of Robert Friedland, our founder and Executive Chairman, or any member of our senior management team could impair our ability to execute our business plan and could, therefore, have a material adverse effect on our business, results of operations and financial condition. In addition, the international mining industry is very active and we are facing increased competition for qualified personnel in all disciplines and areas of operation. We may not be able to attract and retain personnel to sufficiently staff our development and operating teams.
Our directors and officers may have conflicts of interest as a result of their relationships with other mining companies that are not affiliated with us.
Robert Friedland and some of our other directors and officers are also, or may also become, directors, officers and stockholders of other companies, including companies that are similarly engaged in the business of developing and exploiting natural resource properties. Consequently, there is a possibility that our directors and officers may have conflicts of interest from time to time. To the extent that such other companies may participate in ventures in which we may participate in, or in ventures which we may seek to participate in, our directors and officers may have a conflict of interest in negotiating and concluding terms respecting the extent of such participation. In all cases where our directors and officers have an interest in other companies, such other companies may also compete with us for the acquisition of mineral property investments.
We may have difficulty recruiting and retaining employees.
Recruiting and retaining qualified personnel is critical to the success of exploration activities and to future mine development and mine operations. The number of persons skilled in acquisition, exploration and development of mining projects is limited and competition for qualified persons is intense. As our business activity grows, we will require additional key financial, administrative, geologic and mining personnel as well as additional operations staff. We may not be successful in attracting, training and retaining qualified personnel as competition for persons with these skill sets increases. If we are not successful in attracting, training and retaining qualified personnel, we may have inadequate staffing to advance all of our exploration activities and to conduct mine development activities, or such activities may be reduced or delayed, which could have an adverse material impact on our prospects, business, results of operations and financial condition.
Any acquisitions we make may not be successful or achieve the expected benefits.
We regularly consider and evaluate opportunities to acquire assets, companies and operations, including prospective mining projects or properties. We may not be able to successfully integrate any acquired assets, companies or operations, and prospective mining projects or properties that we acquire may not develop as anticipated. Acquisition transactions involve inherent risks, including but not limited to:
•inaccurate assessments of the value, strengths, weaknesses, contingent and other liabilities and potential profitability of acquisition candidates;
•inability to exploit identified and anticipated operating and financial synergies;
•unanticipated costs;
•diversion of management attention from existing business;
•potential loss of our key employees or key employees of any business acquired;
•unanticipated changes in business, industry or general economic conditions that affect the assumptions underlying the acquisition;
•decline in the value of acquired properties, companies or securities;
•inability to maintain our financial and strategic focus while integrating the acquired business or property;
•inability to implement uniform standards, controls, procedures and policies at the acquired business, as appropriate; and
•to the extent that we make an acquisition outside of markets in which we have previously operated, inability to conduct and manage operations in a new operating environment.
As we do not have significant cash flow from operations and do not expect to have significant cash flow from operations in the foreseeable future, any such acquisitions will be funded by cash raised in equity financings or through the issuance of new equity or equity-linked securities. Equity issuances also may result in dilution of existing stockholders. If we were to incur debt to finance an acquisition, the requirement to repay that debt may lead us to issue additional equity to repay the debt, all in the absence of positive cash flow. Any such developments may materially and adversely affect our financial position and results of operations.
If future acquisitions are significant, they could change the scale of our business and expose us to new geographic, political, operating and financial risks. In addition, each acquisition involves a number of risks, such as the diversion of our management team’s attention from our existing business to integrating the operations and personnel of the acquired business, possible adverse effects on our results of operations and financial condition during the integration process, our inability to achieve the intended objectives of the combination and potential unknown liabilities associated with the acquired assets.
Our information technology systems may be vulnerable to cyber-attack or other disruption, which could place our systems at risk for data loss, operational failure or compromise of confidential information.
We rely on various information technology systems. These systems remain vulnerable to disruption, damage or failure from a variety of sources, including, but not limited to, errors by employees or contractors, computer viruses, cyber-attacks, including phishing, ransomware, and similar malware, misappropriation of data by outside parties, and various other threats. Techniques used to obtain unauthorized access to or sabotage our systems are under continuous and rapid evolution, and we may be unable to detect efforts to disrupt our data and systems in advance. Breaches and unauthorized access carry the potential to cause losses of assets or production, operational delays, equipment failure that could cause other risks to be realized, inaccurate recordkeeping, or disclosure of confidential information, any of which could result in financial losses and regulatory or legal exposure, and could have a material adverse effect on our business, financial condition or results of operations. We may incur material losses relating to cyber-attacks or other information security breaches in the future. Our risk and exposure to these matters cannot be fully mitigated because of, among other things, the evolving nature of these threats. As such threats continue to evolve, we may be required to expend additional resources to modify or enhance any protective measures or to investigate and remediate any security vulnerabilities.
We may be subject to claims and legal proceedings that could materially and adversely impact our business, financial condition or results of operations.
We may be subject to claims or legal proceedings covering a wide range of matters that arise in the ordinary course of business activities. These matters may result in litigation which can distract management from our business or have an
unfavorable resolution, which could materially and adversely impact our business, financial condition and results of operations. See “Risks Related to our Mining Businesses and the Mining Industry--Our subsidiary, Cordoba, is involved in lengthy litigation, which may adversely affect the value of our investment in it and its mineral projects”.
We are subject to the risk of labor disputes, which could adversely affect our business.
We may experience labor disputes in the future, including protests, blockades and strikes, which could disrupt our business operations and have an adverse effect on our business and results of operations. We may not be able to maintain a satisfactory working relationship with our employees in the future.
Our activities and business could be adversely affected by the effects of health epidemics and other public health threats, pandemic, in regions where we conduct our business operations.
Our business and exploration activities could be adversely affected by health epidemics or pandemics. Federal, state, and local governments may implement various mitigation measures at various times to address a pandemic, including travel restrictions, border closings, restrictions on public gatherings, shelter-in-place restrictions and limitations on non-essential business. Some of these actions may halt, hinder, delay or slowdown our exploration activities or future development of mining operations, or increase our costs to conduct such activities. Disruptions in the financial markets as a result of a pandemic could make it more difficult for us to access the capital markets in the future.
RISKS RELATED TO GOVERNMENT REGULATIONS AND INTERNATIONAL OPERATIONS
We have subsidiaries, mineral projects, investments or other activities in the United States, the PRC, Chile, Colombia, Peru, Ivory Coast, Saudi Arabia and other countries where the governments extensively regulate operations and assets, imposing significant actual and potential costs on us.
Our business activities and assets are is subject to increasingly strict laws and regulation by federal, state and local authorities in the jurisdictions in which we have subsidiaries, mineral projects, investments or other activities, including the United States, the PRC, Chile, Colombia, Peru, Ivory Coast, Saudi Arabia and other countries. These laws and regulations include, without limitation, those related to tax; employment; benefits; health and safety; the environment; exports/imports; national security; price and foreign exchange controls; anti-corruption; land use; mine permitting and licensing requirements; exploration and drilling activities; reclamation and restoration of properties after mining is completed; management of materials generated by mining operations; dealing with local or disadvantaged communities; possible state intervention; and storage, treatment and disposal of wastes and hazardous materials, among other things.
The liabilities and requirements associated with the laws and regulations related to these and other matters, including with respect to air emissions, water discharges, archaeological and other environmental matters, may be costly and time-consuming and may restrict, delay or prevent commencement or continuation of exploration. development or production operations. We may not have been or may not be at all times in compliance with all applicable laws and regulations in all jurisdictions. Failure to comply with applicable laws and regulations may result in the assessment of administrative, civil and criminal penalties, the imposition of cleanup and site restoration costs and liens, the issuance of injunctions to limit or cease operations, the suspension or revocation of permits or authorizations and other enforcement measures that could have the effect of limiting or preventing production from our operations. We may incur material costs and liabilities resulting from claims for damages to property or injury to persons arising from our operations. If we are pursued for sanctions, costs and liabilities in respect of these matters, our exploration activities or mining operations and, as a result, our financial performance, financial position and results of operations, could be materially and adversely affected.
Any new legislation or administrative regulations or new judicial interpretations or administrative enforcement of existing laws and regulations that would further regulate and tax the mining industry may also require us to change activities significantly or incur increased costs, or even potentially halt or cease activities entirely. Such changes could have a material adverse effect on our prospects, our business, financial condition and results of operations.
Our activities outside of the United States are subject to additional political, economic and other uncertainties not necessarily present for activities taking place within the United States.
We have mineral projects, investments or other activities outside the United States, in the PRC, Chile, Colombia, Peru, Ivory Coast, Saudi Arabia and other countries. Some of these countries are less developed economically and politically than the United States, and have historically been more politically or socially unstable than the United States, including with respect to civil unrest and significant civil strife (including violent insurrections). We are also subject to the risks of
deteriorating relations between or among the countries in which we operate. As such, our activities in these countries are subject to significant risks not necessarily present in the United States and additional risks inherent in exploration and resource extraction by foreign companies. Our exploration and future development and production activities in these countries are therefore subject to heightened risks, many of which are beyond our control. These risks include:
•the possible unilateral cancellation or forced re-negotiation of contracts and licenses;
•unfavorable or arbitrary changes in laws and regulations;
•arbitrary royalty, tariff and tax increases;
•claims by governmental entities or indigenous communities;
•expropriation or nationalization of property;
•political instability (including civil strife, insurrection and potentially civil war);
•significant fluctuations in currency exchange rates;
•currency controls;
•local ownership requirements;
•social and labor unrest, organized crime, hostage taking, terrorism and violent crime;
•uncertainty regarding the enforceability of contractual rights and judgments;
•other risks arising out of foreign governmental sovereignty over areas in which our mineral properties are located; and
•disputes or deterioration of relations between and among countries may adversely affect the political, economic, social and other factors to which we are subject.
Local economic conditions also can increase costs and adversely affect the security of our activities and the availability of skilled workers and supplies. Higher incidences of criminal activity and violence in the area of some of our properties could adversely affect our ability to operate in an optimal fashion or at all, and may impose greater risks of theft and higher costs, which could adversely affect results of operations and financial condition.
Acts of civil disobedience are not uncommon in some of these countries. Mining companies have been targets of actions to restrict their legally-entitled access to mining concessions or property. Such acts of civil disobedience often occur with no warning and can result in significant direct and indirect costs. We may experience disruptions in the future, which could adversely affect our business and our exploration and development activities.
Tariff announcements and other developments in international trade policies and regulations could adversely affect our operations and outlook.
As a U.S.-based mining company with operations internationally, including operations and business activities in various countries including Canada and China, we are sensitive to changes in international trade policies and regulations. In 2025, the U.S. President announced various tariff plans that included the imposition of U.S. tariffs on various countries for products such as steel and aluminum. Additional tariff actions may be taken by the U.S. and foreign governments. We are unable to predict the ultimate result and duration of any tariff actions by the U.S. government, or countermeasures that may be taken by other nations.
We cannot assure you that the imposition of tariffs or other changes in trading policies, potential trade wars, or uncertainties in international trading policies and regulations will not adversely impact our operations, particularly given our presence across multiple jurisdictions. If such tariffs apply to, or new tariffs may be imposed on, products or equipment we may need to source and import our costs could increase accordingly. For example, VRB USA anticipates importing equipment and electrolyte from China, and these tariffs are expected to increase VRB USA’s costs. Any further increases in tariffs imposed on products imported from China could result in additional cost increases for VRB USA. Tariffs could have a general inflationary effect, which could increase the cost of our U.S. exploration activities. If we decide to develop our U.S. mineral properties in the future, tariffs could increase our development costs and capital expenditures, which may affect the projected economics of our projects.
Recent tariff actions have resulted in market uncertainty and volatility. Continued market uncertainty or volatility, or any broader economic challenges resulting from adverse developments in internal trade policies, could adversely affect the price of our stock, our ability to raise additional capital or the prices of the metals that we hope to produce, should we develop any of our mineral projects.
Our subsidiary Cordoba operates in a jurisdiction, Colombia, which has heightened security risks.
Colombia is home to South America’s largest and longest running insurgency. The situation may become unstable and may deteriorate in the future into violence, including kidnapping, gang warfare, homicide and/or terrorist activity. Any such actions may generally disrupt supply chains and business activities in Colombia, and discourage qualified individuals from being involved with Cordoba’s operations. Our operations may be impacted as a result, and our ability to advance Alacran Project may be delayed or halted altogether. This may include the inability to access the project site, as well as damage to property and injury or death to our personnel. Any such events could have a material adverse effect on Cordoba’s business, results of operations, financial condition and prospects.
Illegal mining activities may negatively impact our ability to explore, develop and operate some mineral projects.
Artisanal and illegal miners are present at the Alacran Project in Colombia (owned directly by Cordoba) and the Pinaya Project in Peru. As these companies further explore and advance these projects towards production, they must enter into discussions with illegal miners operating at the projects. There is a risk that such illegal miners may oppose activities at the Alacran Project or the Pinaya Project and this may result in a disruption to the planned development and/or mining and processing operations, all of which may have an adverse effect on our investment in these projects. In addition, illegal miners have extracted metals from both projects in a manner that does not meet health and safety or environmental standards. Accidents may occur and may range from minor to serious, including death. While all formal steps are taken to notify the authorities when illegal miners operate in an unsafe manner, illegal miners may advance within close proximity to our contemplated mine sites or trespass on them, which may disrupt exploration and development activities, and may result in increased costs to address the presence of such illegal miners.
Our foreign mining projects and investments are subject to risk typically associated with operating in foreign countries.
In general, our foreign mining projects and investments are subject to the risks typically associated with conducting business in foreign countries. These risks may include, among others: labor disputes; invalidation of governmental orders and permits; corruption; uncertain political and economic environments; sovereign risk; war; civil disturbances and terrorist actions; arbitrary changes in laws; the failure of foreign parties to honor contractual relations; opposition to mining from environmental or other non-governmental organizations; limitations on foreign ownership; limitations on the repatriation of earnings; limitations on minerals and commodity exports; instability due to economic under-development; inadequate infrastructure; and increased financing costs. In addition, the enforcement of our legal rights may not be recognized by any foreign government, or by the court system of a foreign country. These risks may limit or disrupt our activities, restrict the movement of funds, or result in the deprivation of mining-related rights or the taking of property by nationalization or expropriation without fair compensation. The occurrence of events associated with these risks could have a material and adverse effect on our mineral projects, business and activities, the viability our foreign operations and investments, and could have a material and adverse effect on our future cash flow, earnings, results of operations and financial condition.
Uncertainty in governmental agency interpretation or court interpretation and the application of applicable laws and regulations in any jurisdictions where we operate or have investments could result in unintended non-compliance.
The courts in some of the jurisdictions in which we operate may offer less certainty as to the judicial outcome of legal proceedings or a more protracted judicial process than is the case in more established economies such as the United States. Businesses can become involved in lengthy court cases over simple issues when rulings are not clearly defined, and the poor drafting of laws and excessive delays in the legal process for resolving issues or disputes compound such problems. Accordingly, we could face risks such as:
•greater difficulty in obtaining effective legal redress in the courts of such jurisdictions, whether in respect of a breach of law or regulation, or in an ownership dispute;
•a higher degree of discretion on the part of governmental authorities, which leads to greater uncertainty;
•the lack of judicial or administrative guidance on interpreting applicable rules and regulations;
•inconsistencies or conflicts between and within various laws, regulations, decrees, orders and resolutions; or
•relative inexperience of the judiciary and courts in such matters.
Enforcement of laws in some of the jurisdictions in which we operate may depend on and be subject to the interpretation of such laws by the relevant governmental authorities, and such authority may adopt an interpretation of an aspect of local law that differs from the advice that has been given to us by local lawyers or even by the relevant local authority itself. In addition, there may be limited or no relevant case law providing guidance on how courts would interpret such laws and the application of such laws to our contracts, joint ventures, licenses, license applications or other legal arrangements. Thus, contracts, joint ventures, licenses, license applications or other legal arrangements may be adversely affected by the actions of government authorities and the effectiveness of and enforcement of such arrangements in these jurisdictions. In some of the jurisdictions in which we operate, the commitment of local businesses, government officials and agencies and the judicial system to abide by legal requirements and negotiated agreements may be more uncertain and may be susceptible to revision or cancellation, and legal redress may be uncertain or delayed. These uncertainties and delays could have a material adverse effect on our business and activities, as well as our results of operations and financial condition.
Proposed changes to United States federal mining and public land law could impose, among other things, royalties and fees paid to the United States government by mining companies and royalty holders.
Periodically, members of the United States Congress have introduced bills which would supplant or alter the provisions of The General Mining Law of 1872 which governs the disposition of metallic minerals on lands owned by the federal government. Some of our mineral properties occur on unpatented mining claims located on United States federal lands. There have been recent proposals to amend the United States mining law to impose a royalty on the production of select hardrock minerals, such as silver, gold and copper, from U.S. federal lands, and a reclamation fee on production from federal and other lands.
Any such proposal, if enacted by the United States Congress, could substantially increase the cost of holding mining claims and could reduce our revenue from unpatented mining claims, and to a lesser extent, on other lands in the United States. Moreover, such legislation could significantly impair the ability of our properties to develop Mineral Resources on unpatented mining claims. Although at this time we are not able to predict what royalties and fees may be imposed in the future, the imposition of such royalties and fees could adversely affect the potential for development of such mining claims and the economics of existing operating mines. Passage of such legislation may result in a material and adverse effect on our profitability, results of operations, financial condition and the trading price of our common stock.
We are subject to, and may become liable for any violations of anti-corruption and anti-bribery laws.
Our operations are governed by, and involve interactions with, various levels of government in foreign countries. We are required to comply with anti-corruption and anti-bribery laws, including the U.S. Foreign Corrupt Practices Act (the “FCPA”) and similar laws where we have activities. These laws generally prohibit companies and company employees from engaging in bribery or other prohibited payments to foreign officials for the purpose of obtaining or retaining business. The FCPA also requires companies to maintain accurate books and records and internal controls. As we have certain subsidiaries, mineral projects and investments and other activities in other countries, including Chile, Colombia, Peru, Ivory Coast, Saudi Arabia and the PRC, there is a risk of potential FCPA violations.
In recent years, there has been a general increase in both the frequency of enforcement and the severity of penalties under such laws, resulting in greater scrutiny and punishment to companies convicted of violating anti-corruption and anti-bribery laws. A company may be found liable for violations by not only its employees, but also by its contractors and third-party agents. Our internal procedures and policies may not always be effective in ensuring that we, our employees, contractors or third-party agents will comply strictly with all such applicable laws. If we become subject to an enforcement action or we are found to be in violation of such laws, this may have a material adverse effect on our reputation and may possibly result in significant penalties or sanctions, and may have a material adverse effect on our business, financial condition or results of operations.
Changes to United States and foreign tax laws could adversely affect our results of operations.
We are subject to tax in the United States and foreign jurisdictions. Current economic and political conditions make tax laws and their interpretation subject to significant change in any jurisdiction. We cannot predict the timing or significance of future tax law changes in the United States or other countries in which we do business. If material tax law changes are enacted, our future effective tax rate, results of operations, and cash flows could be adversely impacted. Further, tax authorities, now or in the future, may periodically conduct reviews of our tax filings and compliance. Those reviews could result in adverse tax consequences and unexpected financial costs and exposure.
RISKS RELATED TO OUR COMMON STOCK
Future sales and issuances of our common stock or rights to purchase common stock, including pursuant to warrants or our equity incentive plans, could result in additional dilution of the percentage ownership of our stockholders and could cause the price of our common stock to decline.
In the future, we may sell common stock, convertible securities, or other equity securities in one or more transactions at prices and in the manner we determine from time to time. We also issue securities to employees and directors pursuant to our equity incentive plans. If we sell common stock, convertible securities, or other equity securities in subsequent transactions, or common stock is issued pursuant to warrants or equity incentive plans, our investors’ holdings may be materially diluted. In addition, new investors in such subsequent transactions could gain rights, preferences, and privileges senior to those of holders of our common stock.
If a substantial number of our shares of common stock are sold, or it is perceived that they will be sold, in the public market, the market price of our common stock could decline.
Sales of a substantial number of shares of our common stock in the public market could occur at any time. These sales, or the perception in the market that the holders of a large number of shares of common stock intend to sell shares, could reduce the market price of our common stock. Most of our outstanding shares of common stock can be sold at any time pursuant to Rule 144 of the Securities Act, or pursuant to registration statements that we have filed or agreed to file to permit the resale of such shares. We have also registered all shares of common stock that we may issue under our equity compensation plans or that are issuable upon exercise of outstanding options or other equity awards. Therefore, these shares can be freely sold in the public market. If significant amounts of our shares are sold, or if it is perceived that they will be sold, in the public market, the market price of our common stock could decline.
If securities or industry analysts either do not publish research about us or publish inaccurate or unfavorable research about us, our business or our market, or if they change their recommendations regarding our common stock adversely, the trading price or trading volume of our common stock could decline.
The trading market for our common stock will be influenced in part by the research and reports that securities or industry analysts may publish about us, our business, our market, or our competitors. If one or more of these analysts initiate research with an unfavorable rating or downgrade our common stock, provide a more favorable recommendation about our competitors or publish inaccurate or unfavorable research about our business, our common stock price would likely decline. If any analyst who may cover us were to cease coverage of us or fail to regularly publish reports on us, we could lose visibility in the financial markets, which in turn could cause the trading price or trading volume of our common stock to decline.
Maaden holds certain top-up rights that could lead to further dilution or adversely affect our stock price.
We have granted Maaden the right to purchase additional shares of common stock to maintain its 8.1% stock ownership position in the event of any issuances of common stock by us (the “Maaden Top-Up Right”). Maaden may exercise this right each time we issue shares (or securities convertible into shares) for cash as part of an equity financing transaction and in certain other circumstances.
In the event that Maaden does not exercise the Maaden Top-Up Right, the ownership threshold for purposes of Maaden Top-Up Right will be reduced to its ownership level after giving effect to the dilutive issuance. The Maaden Top-Up Right will expire on July 6, 2028. To the extent the Maaden Top-Up Right is exercised, such exercise would cause dilution to our shareholders. Any decision by Maaden not to exercise Maaden Top-Up Right could adversely affect the price of our common stock.
The price of our common stock may be volatile and fluctuate substantially, which could result in substantial losses for purchasers of our common stock.
Our stock price is volatile. The stock market in general has experienced extreme volatility that has often been unrelated to the operating performance of particular companies. The market price for our common stock may be influenced by many factors, including: the failure to identify Mineral Resources or Mineral Reserves at our properties; the failure to achieve production at any of our mineral properties; the lack of mineral exploration success; the actual or anticipated changes in the price of commodities we are seeking to discover and mine, namely copper, nickel, vanadium, cobalt, platinum group elements, gold and silver; changes in market valuations of similar companies; changes in technology and demand for
minerals; the success or failure of competitor mining companies; changes in our capital structure, such as future issuances of securities or the incurrence of debt; sales of common stock by us, our executive officers, directors or principal stockholders, or others; changes in regulatory requirements and the political climate in the United States, and other jurisdictions where we have activities, including Canada, Colombia, Peru, Ivory Coast, Saudi Arabia and the PRC; litigation involving us, our general industry or both; the recruitment or departure of key personnel; our ability to control our costs; accidents at mining projects, whether owned by us or otherwise; cyber-attacks or cyber-breaches; natural disasters, terrorist attacks, and acts of war, including the large-scale invasion of Ukraine by Russia; general economic, industry and market conditions, such as the impact of pandemics, on our industry and market conditions, or the occurrence of other epidemics or pandemics; and the other factors described in this “Risk Factors” section.
In the past, following periods of volatility in the market price of a company’s securities, securities class- action litigation has often been instituted against that company. Any lawsuit to which we are a party, with or without merit, may result in an unfavorable judgment. We also may decide to settle lawsuits on unfavorable terms. Any such negative outcome could result in payments of substantial damages or fines, damage to our reputation or adverse changes to our offerings or business practices. Such litigation may also cause us to incur other substantial costs to defend such claims and divert management’s attention and resources. Furthermore, negative public announcements of the results of hearings, motions or other interim proceedings or developments could have a negative effect on the market price of our common stock.
The market price of our common stock is subject to fluctuations and may not reflect our long-term value at any given time, and we may be subject to securities litigation as a result.
The price of our common stock is likely to be significantly affected by a variety of factors and events including short-term changes to our financial condition or results of operations as reflected in our quarterly financial statements. Other factors unrelated to our performance that may have an effect on the price of our common stock include the following: (i) the extent of analytical coverage available to investors concerning our business may be limited if investment banks with research capabilities do not follow our securities; (ii) lessening in trading volume and general market interest in our securities may affect an investor’s ability to trade significant numbers of our common stock; (iii) the size of our public float may limit the ability of some institutions to invest in our securities; and (iv) a substantial decline in the price of our common stock that persists for a significant period of time could cause our securities to be delisted from the NYSE American or the TSX, further reducing market liquidity.
As a result of any of these factors, the market price of our common stock is subject to fluctuations and may not accurately reflect our long-term value at any given point in time. Securities class action litigation has often been brought against companies following periods of volatility in the market price of their securities. We may be the target of similar litigation in the future. Securities litigation could result in substantial costs and damages and divert management’s attention and resources.
Our amended and restated certificate of incorporation and second amended and restated bylaws contain provisions that may make the acquisition of our company more difficult.
Certain provisions in our amended and restated certificate of incorporation and second amended and restated bylaws contain provisions that may make the acquisition of our company more difficult, including the following:
•our amended and restated certificate of incorporation requires that amendments to certain provisions of our amended and restated certificate of incorporation or amendments to our second amended and restated bylaws generally require the approval of at least majority of the voting power of our outstanding capital stock;
•our stockholders are only able to take action at a meeting of stockholders and are not able to take action by written consent for any matter;
•our amended and restated certificate of incorporation does not provide for cumulative voting;
•vacancies on our Board of Directors are able to be filled only by our Board of Directors and not by stockholders;
•a special meeting of our stockholders may only be called by the chairperson of our Board of Directors or our Chief Executive Officer, as applicable, or a majority of our Board of Directors;
•restrict the forum for certain litigation against us to Delaware or the federal courts of the United States, as applicable;
•our amended and restated certificate of incorporation authorizes undesignated preferred stock, the terms of which may be established and shares of which may be issued without further action by our stockholders; and
•advance notice procedures apply for stockholders to nominate candidates for election as directors or to bring matters before an annual meeting of stockholders.
Moreover, Section 203 of the Delaware General Corporation Law (the “DGCL”) may discourage, delay or prevent a change in control of our company. Section 203 imposes certain restrictions on mergers, business combinations and other transactions between us and holders of 15% or more of our common stock.
These provisions, alone or together, could discourage, delay or prevent a transaction involving a change in control of our company. These provisions could also discourage proxy contests and make it more difficult for stockholders to elect directors of their choosing and to cause us to take other corporate actions they desire, any of which, under certain circumstances, could limit the opportunity for our stockholders to receive a premium for their shares of our common stock, and could also affect the price that some investors are willing to pay for our common stock.
Our Board of Directors is authorized to issue and designate shares of our preferred stock in additional series without stockholder approval.
Our amended and restated certificate of incorporation authorizes our Board of Directors, without the approval of our stockholders, to issue 50,000,000 shares of our preferred stock, subject to limitations prescribed by applicable law, rules and regulations and the provisions of our amended and restated certificate of incorporation, as shares of preferred stock in series, to establish from time to time the number of shares to be included in each such series and to fix the designation, powers, preferences and rights of the shares of each such series and the qualifications, limitations or restrictions thereof. The powers, preferences and rights of these additional series of preferred stock may be senior to or on parity with our common stock, which may reduce its value.
Our amended and restated certificate of incorporation designates specific state or federal courts as the exclusive forum for certain litigation that may be initiated by our stockholders, which could limit stockholders’ ability to obtain a favorable judicial forum for disputes with us.
Our amended and restated certificate of incorporation provides that, unless we consent in writing to the selection of an alternative forum, to the fullest extent permitted by law, the Court of Chancery of the State of Delaware will be the sole and exclusive forum for any state law claims for:
•any derivative action or proceeding brought on our behalf;
•any action asserting a claim of breach of fiduciary duty owed by any of our directors, officers or other employees to us or our stockholders;
•any action asserting a claim arising pursuant to the DGCL, our amended and restated certificate of incorporation or our second amended and restated bylaws; or
•any action asserting a claim that is governed by the internal affairs doctrine (the “Delaware Forum Provision”).
The Delaware Forum Provision does not apply to any causes of action arising under the Securities Act or the Exchange Act. Further, our amended and restated certificate of incorporation provides that, unless we consent in writing to the selection of an alternative forum, the federal district courts of the United States are the sole and exclusive forum for resolving any complaint asserting a cause of action arising under the Securities Act (the “Federal Forum Provision”). In addition, our amended and restated certificate of incorporation provides that any person or entity purchasing or otherwise acquiring any interest in shares of our capital stock is deemed to have notice of and consented to the Delaware Forum Provision and the Federal Forum Provision; provided, however, that stockholders cannot and will not be deemed to have waived our compliance with the United States federal securities laws and the rules and regulations thereunder.
The Delaware Forum Provision and the Federal Forum Provision in our amended and restated certificate of incorporation may impose additional litigation costs on stockholders in pursuing any such claims. Additionally, these forum selection clauses may limit our stockholders’ ability to bring a claim in a judicial forum that they find favorable for disputes with us or our directors, officers or employees, which may discourage the filing of lawsuits against us and our directors, officers and employees, even though an action, if successful, might benefit our stockholders. In addition, while the Delaware Supreme Court ruled in March 2020 that federal forum selection provisions purporting to require claims under the Securities Act be brought in federal court are “facially valid” under Delaware law, there is uncertainty as to whether other courts will enforce our Federal Forum Provision. If the Federal Forum Provision is found to be unenforceable, we may incur additional costs associated with resolving such matters. The Federal Forum Provision may also impose additional litigation costs on stockholders who assert that the provision is not enforceable or invalid. The Court of Chancery of the State of Delaware and the federal district courts of the United States may also reach different judgments
or results than would other courts, including courts where a stockholder considering an action may be located or would otherwise choose to bring the action, and such judgments may be more or less favorable to us than our stockholders.
We do not currently intend to pay dividends on our common stock and consequently, the ability to achieve a return on investment will depend on appreciation in the price of our common stock.
We have never declared or paid any cash dividends on our capital stock. We do not intend to pay any cash dividends on our common stock for the foreseeable future. We currently intend to retain any future earnings to finance our business. In addition, Delaware law may impose requirements that may restrict our ability to pay dividends to holders of our common stock. As a result, stockholders must rely on sales of their shares of common stock after price appreciation as the only way to realize any future gains on their investment. The payment of any future dividends, if any, will be determined by our Board of Directors in light of conditions then existing, including our earnings, financial condition and capital requirements, business conditions, corporate law requirements and other factors.
If we are unable to implement and maintain effective internal controls over financial reporting, investors may lose confidence in the accuracy and completeness of our financial reports.
As a public company, we are required to implement and maintain internal controls over financial reporting and to report any material weaknesses in such internal controls. There is no guarantee we will maintain effective internal controls in the future.
If during the evaluation and testing process, we identify one or more material weaknesses in the design or effectiveness of our internal control over financial reporting or determine that existing material weaknesses have not been remediated, our management will be unable to assert that our internal control over financial reporting is effective. Even if our management concludes that our internal control over financial reporting is effective, our independent registered public accounting firm may conclude that there are material weaknesses with respect to our internal controls or the level at which our internal controls are documented, designed, implemented, or reviewed. If we are unable to assert that our internal control over financial reporting is effective, or if our independent registered public accounting firm is unable to express an opinion as to the effectiveness of our internal control over financial reporting, investors may lose confidence in the accuracy and completeness of our financial reports and the valuation of our common stock could be adversely affected.
Non-U.S. holders may be subject to United States federal income tax on gain on the sale or other taxable disposition of our common stock.
Because we hold significant United States real property interests, we believe we are a “United States real property holding corporation” for United States federal income tax purposes. As a result, a non-U.S. holder generally will be subject to United States federal income tax with respect to any gain on the sale or other taxable disposition of our common stock (and will be required to file a United States federal income tax return for the taxable year of such sale or other taxable disposition), unless our common stock is regularly traded on an established securities market and such non-U.S. holder did not actually or constructively hold more than 5% of our common stock at any time during the shorter of (a) the five-year period preceding the date of the sale or disposition of such common stock or (b) the non-U.S. holder’s holding period for such common stock. Additionally, a purchaser of our common stock generally will be required to withhold and remit to the Internal Revenue Service fifteen percent (15%) of the purchase price paid to such non-U.S. holder unless, at the time of such sale or other disposition, any class of our stock is regularly traded on an established securities market or any other exception to such withholding applies.
We believe that our common stock currently is regularly traded on an established securities market. However, no assurance can be given in this regard and no assurance can be given that our common stock will remain regularly traded in the future. Non-U.S. holders should consult their own tax advisors concerning the consequences of disposing of our common stock.
A significant number of the members of our Board of Directors and executive officers and certain of the experts named in this Annual Report are non-U.S. residents, and you may not be able to enforce civil liabilities against these persons.
Although Ivanhoe Electric is incorporated under the DGCL, a significant number of the members of our Board of Directors and executive officers and certain of the experts named in this Annual Report are non-U.S. residents, and certain assets of such persons are located outside the United States. As a result, you may not be able to effect service of process within the United States upon these persons or to enforce, in U.S. courts, against these persons or their assets, judgments of U.S. courts predicated upon any civil liability provisions of the U.S. federal or state securities laws. In addition, you may not be able to enforce certain civil liabilities predicated upon U.S. federal or state securities laws in non-US jurisdictions
against us, our directors and executive officers and certain of the experts named in this Annual Report or the assets of such persons.
Item 1B. Unresolved Staff Comments
None.
Item 1C. Cybersecurity
We utilize internal personnel and external cybersecurity consultants to focus on assessing, detecting, identifying, managing, preventing and responding to cybersecurity threats and incidents. The underlying controls of our cybersecurity management process are based on recognized best practices and standards for cybersecurity and information technology, including the framework of Critical Security Controls of the Center of Internet Security. To assess the design and effectiveness of our cybersecurity controls, we engage with external consultants, auditors and other third parties.
We have experienced cybersecurity incidents in the past which have not materially affected us. We may not be successful in preventing or mitigating a cybersecurity incident that could materially affect our results of operations or financial condition. Refer to Item 1A. “Risk Factors” for further information on the risks we face from cybersecurity threats.
Our cybersecurity risk management and processes are led by our Chief Financial Officer, with support of management, internal personnel and external consultants. While management is responsible for the day-to-day management of cybersecurity risks, our Board of Directors, through its Audit Committee, has oversight of the Company’s processes, policies and procedures for assessing, identifying, and managing material risks from cybersecurity threats including the integration and establishment of cybersecurity processes into the Company’s overall risk management system or processes.
Item 2. Properties
See Item 1. Business for information about our mineral properties.
In March 2023, we entered into a five-year lease for office space in Tempe, Arizona, which now serves as our headquarters. Global Mining Management Corp. provided us with office space for our office in Vancouver, Canada, pursuant to a Cost Sharing Agreement up until October 2025. The Cost Sharing Agreement has been terminated. See Note 20 of our Consolidated Financial Statements included in Item 8. Financial Statements and Supplementary Data.
Item 3. Legal Proceedings
From time to time, we and our subsidiaries may become subject to various legal proceedings that are incidental to the ordinary conduct of our business. Although we cannot accurately predict the amount of any liability that may ultimately arise with respect to any of these matters, we make a provision for potential liabilities when we deem them probable and reasonably estimable. These provisions are based on current information and legal advice and may be adjusted from time to time according to developments.
Our subsidiary Cordoba is currently involved in two legal proceedings. The first is a criminal lawsuit filed by Cordoba in late 2018 and in January 2019 with the Colombian prosecutors against nine members of former Colombian management alleging breach of fiduciary obligations, abuse of trust, theft and fraud. This proceeding is ongoing. In the second proceeding, Cordoba (along with the National Mining Agency, Ministry of Mines and Energy, the local environmental authority, the Municipality of Puerto Libertador and the State of Cordoba) were served with a class action claim by the Alacran Community. This class action seeks (i) an injunction against Cordoba´s operations in the Alacrán area and (ii) an injunction against the prior declaration by the authorities that the Alacran Community´s mining activities were illegal. The claim was initially filed with the Administrative Court of Medellín, which remanded the case to the Administrative Court of Montería, which contested it and submitted the case to the Council of State. The Council of State determined the Administrative Court of Montería as the competent tribunal, where the process is currently being conducted. The Administrative Court of Montería admitted the commencement of the class action on September 2021. The decision was challenged by Cordoba and other defendants and confirmed by the Court. Cordoba timely filed its: (i) response to the lawsuit and statement of defense; and (ii) opposition to the injunction requested by plaintiffs. The Court now should: (i) issue a decision on the injunction; and (ii) schedule date and time for the initial hearing. While the court matters proceed, Cordoba will incur additional costs that will negatively impact its financial position. As well, the litigation process is uncertain and it is possible that the second proceeding is resolved against Cordoba, which could have a material adverse effect on its business, results of operations, financial condition and prospects.
Item 4. Mine Safety Disclosures
Not applicable.
Part II
Item 5. Market for Registrant's Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities
Market Information
Our common stock has been listed and traded on the NYSE American under the symbol “IE” and on the TSX, also under the symbol “IE”, since June 28, 2022.
Holders of Record
As of February 20, 2026, we had approximately 85 holders of record of our common stock. This number does not include beneficial owners whose shares were held in street name. The actual number of holders of our common stock is greater than this number of record holders and includes stockholders who are beneficial owners, but whose shares are held in street name by brokers or held by other nominees. This number of holders of record also does not include stockholders whose shares may be held in trust by other entities.
Securities Authorized for Issuance Under Equity Compensation Plans
See Item 12.
Recent Sales of Unregistered Securities
During the year ended December 31, 2025, we did not sell any unregistered equity securities except as previously reported on Form 10-Q or Form 8-K.
Purchases of Equity Securities
We made no purchases of our equity securities during the fourth quarter of the year ended December 31, 2025.
Certain United States Federal Income Tax Consequences to Non-U.S. Holders
The following is a summary of certain material United States federal income tax consequences to a non-U.S. holder (as defined below) relating to and arising from the ownership and disposition of our common stock.
This summary is for general information purposes only and does not purport to be a complete analysis or listing of all the potential tax considerations that may apply to a non-U.S. holder arising from or relating to the ownership or disposition of our common stock. In addition, this summary does not take into account the individual facts and circumstances of any particular non-U.S. holder that may affect the U.S. federal income tax consequences relevant to such non-U.S. holder, including, without limitation, specific tax consequences applicable to a non-U.S. holder under an applicable income tax treaty. Accordingly, this summary is not intended to be, and should not be construed as, legal or U.S. federal income tax advice with respect to any particular non-U.S. holder. This summary also does not address the tax considerations arising under the laws of any non-U.S., state or local jurisdiction, or under United States federal gift tax or estate tax laws. This summary also does not address all aspects of U.S. federal income taxation, such as the U.S. alternative minimum tax or the additional tax on net investment income. In addition, except as specifically discussed below, this summary does not discuss applicable income tax reporting requirements. Each prospective non-U.S. holder should consult its own tax advisors regarding the U.S. federal, U.S. state and local, and non-U.S. tax consequences arising from and relating to the acquisition, ownership and disposition of our common stock.
We have not sought any legal opinion from U.S. legal counsel or ruling from the Internal Revenue Service (“IRS”) with respect to the statements made in the following summary, and there can be no assurance that the IRS will agree with such statements. This summary is not binding on the IRS, and the IRS is not precluded from taking a position that is different from, or contrary to, the positions taken in this summary.
This summary is based upon the provisions of the Internal Revenue Code of 1986, as amended (the “Code”), Treasury regulations (whether final, temporary or proposed) promulgated thereunder (“Treasury Regulations”), published rulings of the IRS, published administrative positions of the IRS, and U.S. judicial decisions, all as in effect on the date hereof. These authorities may be changed, possibly retroactively, so as to result in United States federal income or estate tax consequences different from those set forth below. This summary does not discuss the potential effects, whether adverse or beneficial, of any proposed legislation that, if enacted, could be applied on a retroactive or prospective basis.
This summary does not address the tax consequences applicable to a non-U.S. holder’s particular circumstances or to non-U.S. holders that may be subject to special tax rules, including, without limitation:
• banks, insurance companies or other financial institutions;
• persons subject to special tax accounting rules in respect of our common stock;
• tax-exempt organizations, tax-qualified retirement plans, and pension plans;
• controlled foreign corporations, passive foreign investment companies and corporations that accumulate earnings to avoid United States federal income tax and, in each case, shareholders thereof;
• partnerships or other entities treated as pass-through entities (and investors therein) for United States federal income tax purposes;
• dealers in securities or currencies;
• traders in securities that elect to use a mark-to-market method of accounting for their securities holdings;
• persons who acquire our common stock pursuant to the exercise or cancellation of employee stock options or otherwise as compensation for their services;
• persons that own, or are deemed to own, more than five percent (by voting power or value) of our common stock, except to the extent specifically set forth below;
• real estate investment trusts or regulated investment companies;
• certain U.S. expatriates, former citizens or long-term residents of the United States;
• persons who hold our common stock as part of a straddle, hedge, conversion, constructive sale, or other integrated transaction;
• corporations organized outside the United States, any state thereof, or the District of Columbia that are nonetheless treated as U.S. persons for U.S. federal income tax purposes; or
• persons who do not hold our common stock as a capital asset (within the meaning of Section 1221 of the Code).
In addition, if a partnership, including any entity or arrangement classified as a partnership for United States federal income tax purposes, holds our common stock, the United States federal income tax treatment of a partner in the partnership generally will depend on the status of the partner, the activities of the partnership, and certain determinations made at the partner level. Accordingly, partnerships that hold our common stock, and partners in such partnerships, should consult their own tax advisors regarding the United States federal income tax consequences to them of the acquisition, ownership, and disposition of our common stock.
Prospective investors should consult their own tax advisors with respect to the application of the United States federal income tax laws to their particular situation, as well as any tax consequences of the acquisition, ownership and disposition of our common stock arising under other United States federal tax rules, under the laws of any state, local, non-U.S. or other taxing jurisdiction or under any applicable tax treaty.
Non-U.S. Holder Defined
For purposes of this discussion, a “non-U.S. holder” is a beneficial owner of shares of our common stock that is not, for United States federal income tax purposes:
• an individual citizen or resident of the United States;
• a corporation (or other entity treated as a corporation for United States federal income tax purposes) created or organized under the laws of the United States, any state or political subdivision thereof, or the District of Columbia;
• a partnership (or other entity treated as a partnership for United States federal income tax purposes);
• an estate the income of which is subject to United States federal income tax regardless of its source; or
• a trust (x) whose administration is subject to the primary supervision of a United States court and which has one or more United States persons who have the authority to control all substantial decisions of the trust or (y) which has made an election to be treated as a domestic trust.
Distributions
We have not paid and we do not anticipate declaring or paying dividends in the foreseeable future to holders of our common stock. However, if we make a distribution of cash or other property (other than certain pro rata distributions of our common stock) in respect of our common stock, the distribution (including any constructive distribution) will be treated as a dividend for United States federal income tax purposes to the extent it is paid from our current or accumulated earnings and profits (as determined under United States federal income tax principles). If the amount of a distribution exceeds our current and accumulated earnings and profits, the excess will be treated first as a tax-free return of capital that reduces the non-U.S. holder’s adjusted tax basis in such holder’s common stock, but not below zero. Any excess thereafter will be treated as gain realized on the sale or other disposition of our common stock and will be treated as described under “- Sale, Exchange or Other Taxable Disposition of Our Common Stock,” below.
Subject to the discussion below regarding effectively connected income, FATCA (as defined below) and backup withholding, distributions treated as dividends on our common stock held by a non-U.S. holder generally will be subject to United States federal withholding tax at a rate of 30%, or at a lower rate if provided by an applicable income tax treaty and the non-U.S. holder has provided the documentation required to claim benefits under such income tax treaty. Generally, to claim the benefits of an income tax treaty, a non-U.S. holder will be required to provide a properly completed and executed IRS Form W-8BEN, IRS Form W-8BEN-E or other applicable IRS Forms. In the case of any constructive distribution, it is possible that this tax would be withheld from any amount owed to the non-U.S. Holder, including, but not limited to, distributions of cash, common stock or sales proceeds subsequently paid or credited to that holder. If we are unable to determine, at the time of payment of a distribution, whether the distribution will constitute a dividend, we may nonetheless withhold any U.S. federal income tax on the distribution as permitted by Treasury Regulations. As discussed under “- Sale, Exchange or Other Taxable Disposition of Our Common Stock” below, we believe we are a “United States real property holding corporation” (“USRPHC”) within the meaning of Section 897(c)(2). If we are a USRPHC and the Regularly Traded Exception (as defined below) is not satisfied, distributions which constitute a return of capital or gain will be subject to withholding tax at a rate of 15% unless a withholding certificate is obtained from the IRS to reduce or eliminate such withholding.
If a non-U.S. holder holds our common stock in connection with the non-U.S. holder’s conduct of a trade or business within the United States, and dividends paid on our common stock are effectively connected with such non-U.S. holder’s United States trade or business (and, if an applicable tax treaty so provides, are attributable to a permanent establishment or fixed base maintained by the non-U.S. holder in the United States), the dividends will not be subject to the 30% United States federal withholding tax (provided the non-U.S. holder has provided the appropriate documentation, generally an IRS Form W-8ECI, to the withholding agent), but the non-U.S. holder generally will be subject to United States federal income tax in respect of the dividend on a net income basis, and at graduated rates, in substantially the same manner as United States persons. Dividends received by a non-U.S. holder that is a corporation for United States federal income tax purposes and which are effectively connected with the conduct of a United States trade or business may also be subject to a branch profits tax at the rate of 30% (or a lower rate if provided by an applicable tax treaty).
A non-U.S. holder that is eligible for a reduced rate of United States federal withholding tax under an income tax treaty may obtain a refund or credit of any excess amounts withheld by timely filing an appropriate claim for a refund together with the required information with the IRS.
Sale, Exchange or Other Taxable Disposition of Our Common Stock
Subject to the discussion below regarding FATCA and backup withholding, a non-U.S. holder generally will not be subject to United States federal income or withholding tax on any gain realized on the sale or other taxable disposition of our common stock unless:
• such non-U.S. holder is an individual who is present in the United States for 183 days or more in the taxable year of such sale or disposition, and certain other conditions are met;
• such gain is effectively connected with the conduct by the non-U.S. holder of a trade or business in the United States (and, if an applicable tax treaty so provides, is attributable to a permanent establishment or a fixed base maintained by the non-U.S. holder in the United States); or
• our common stock constitutes a United States real property interest (“USRPI”) by reason of our status as a USRPHC at any time within the shorter of the five-year period preceding the disposition or the non-U.S. holder’s holding period for our common stock.
A non-U.S. holder described in the first bullet point above generally will be subject to tax at a gross rate of 30% on the amount by which such non-U.S. holder’s taxable capital gains allocable to United States sources, including gain from the sale or other disposition of our common stock, exceed capital losses allocable to United States sources, except as otherwise provided in an applicable income tax treaty.
If the gain is described in the second bullet point above, gain realized by the non-U.S. holder generally will be subject to United States federal income tax on a net income basis, and at graduated rates, in substantially the same manner as a United States person (except as provided by an applicable tax treaty). In addition, if such non-U.S. holder is a corporation for United States federal income tax purposes, it may also be subject to a branch profits tax at the rate of 30% (or a lower rate if provided by an applicable tax treaty) on such effectively connected gain, as adjusted for certain items.
Because we hold significant real property interests in the United States, we believe we are a USRPHC for United States federal income tax purposes. Because the determination of whether we are a USRPHC depends on the fair market value of our United States real property interests relative to the fair market value of our worldwide real property interests and our other assets used or held for use in a trade or business, it is possible we may (or may not) remain a USRPHC in the future. As a USRPHC, if our common stock is “regularly traded” on an “established securities market” (in each case, as defined by applicable Treasury Regulations) (the “Regularly Traded Exception”) during the calendar year in which a non-U.S. holder disposes of our stock, the non-U.S. holder would not be subject to taxation on the gain on the disposition of our common stock under this rule unless the non-U.S. holder has, actually or constructively, owned more than 5% of our outstanding common stock at any time during the shorter of the five-year period ending on the date of the disposition of such common stock or the non-U.S. holder’s holding period for such common stock (a “5% Shareholder”). We believe that our common stock currently is regularly traded on an established securities market. However, no assurance can be given in this regard and no assurance can be given that our common stock will remain regularly traded in the future. If gain on the sale or other taxable disposition of our common stock by a non-U.S. holder is subject to United States federal income taxation by reason of such stock being treated as a USRPI, such non-U.S. holder generally would be subject to regular United States federal income tax with respect to such gain in the same manner as a taxable U.S. holder and would be required to file a United States federal income tax return for the taxable year in which such gain was recognized. In addition, the purchaser of such common stock from a non-U.S. holder generally would be required to withhold and remit to the IRS 15% of the purchase price paid to such non-U.S. holder unless, at the time of such sale or other disposition, our common stock is regularly traded on an established securities market (as discussed above) or another exception to such withholding applies. The determination of whether a non-U.S. holder is a 5% Shareholder and the potential application of the Regularly Traded Exception is complex and subject to uncertainty. Non-U.S. holders should consult with their own tax advisors regarding such determinations and the consequences of these rules on their investment.
FATCA
Provisions of the Code (commonly referred to as the Foreign Account Tax Compliance Act, or FATCA) generally impose a 30% withholding tax on dividends (including constructive dividends) on, and gross proceeds from the sale or other disposition of, our common stock paid if to or through a “foreign financial institution” or a “non-financial foreign entity” (each as defined in the Code), unless (i) the foreign entity is a foreign financial institution and undertakes certain due diligence, reporting, withholding and certification obligations, (ii) the foreign entity is a non-financial foreign entity and either certifies it does not have any “substantial United States owners” (as defined in the Code) or furnishes identifying information regarding each substantial United States owner, or (iii) the foreign financial institution or non-financial foreign entity is otherwise excepted under FATCA. If the payee is a foreign financial institution and is subject to the diligence and reporting requirements in clause (i) above, it must enter into an agreement with the United States Department of Treasury requiring, among other things, that it undertake to identify accounts held by certain “specified United States persons” or “United States owned foreign entities” (each as defined in the Code), annually report certain information about such
accounts, and withhold 30% on certain payments to non-compliant foreign financial institutions and certain other account holders. Non-U.S. holders typically will be required to furnish certifications (generally on the applicable IRS Form W-8) or other documentation to provide the information required by FATCA or to establish compliance with or an exemption from withholding under FATCA. FATCA withholding may apply where payments are made through a non-U.S. intermediary that is not FATCA compliant, even where the non-U.S. holder satisfies the holder’s own FATCA obligations.
The United States Department of Treasury has released proposed Treasury Regulations (the preamble to which specifies that taxpayers may rely on them pending finalization) which would eliminate FATCA withholding on payments of gross proceeds from the sale or other disposition of our common stock. There can be no assurance that the proposed Treasury Regulations will be finalized in their present form.
The United States and a number of other jurisdictions have entered into intergovernmental agreements to facilitate the implementation of FATCA. Any applicable intergovernmental agreement may alter one or more of the FATCA information reporting and withholding requirements. If withholding under FATCA is required on any payment related to our common stock, investors not otherwise subject to withholding (or that otherwise would be entitled to a reduced rate of withholding) on such payment may be required to seek a refund or credit from the IRS, and may be required to file a U.S. federal income tax return to claim such refunds or credits. Non-U.S. holders should consult their own tax advisors regarding the potential application of withholding under FATCA to an investment in our common stock, including the applicability of any intergovernmental agreements.
Backup Withholding and Information Reporting
Backup withholding, currently at a rate of 24%, generally will not apply to dividends paid to a non-U.S. holder on, or to the gross proceeds paid to a non-U.S. holder from a disposition of, our common stock, provided that the non-U.S. holder furnishes the required certification for its non-U.S. status, such as by providing a valid IRS Form W-8BEN, IRS Form W-8BEN-E, IRS Form W-8ECI, or certain other requirements are met. Backup withholding may apply if the payor has actual knowledge, or reason to know, that the holder is a United States person who is not an exempt recipient.
We are required to report annually to the IRS the amount of any dividends paid to a non-U.S. holder, regardless of whether we actually withheld any tax. Copies of the information returns reporting such dividends and the amount withheld may also be made available to the tax authorities in the country in which the non-U.S. holder resides under the provisions of an income tax treaty or other agreement between the United States and the tax authorities in such country. In addition, proceeds from the disposition by a non-U.S. holder of our common stock that is transacted within the United States or conducted through certain United States-related brokers generally will not be subject to backup withholding or information reporting if the applicable withholding agent receives the certification described above and does not have actual knowledge or reason to know that such holder is a United States person, or the holder otherwise establishes an exemption. Proceeds of a disposition of our common stock conducted through a non-U.S. office of a non-U.S. broker generally will not be subject to backup withholding or information reporting.
Backup withholding is not an additional tax. The United States federal income tax liability of persons subject to backup withholding will be reduced by the amount of tax withheld. If backup withholding results in an overpayment of taxes, a refund or credit may generally be obtained from the IRS, provided that the required information is timely furnished to the IRS.
The preceding summary is for informational purposes only and is not tax advice. Each prospective investor should consult its own tax advisor regarding the particular United States federal, state and local and non-U.S. tax consequences of acquisition, ownership and disposition of our common stock, including the consequences of any proposed changes in applicable laws.
Stock Performance Graph
The following graph shows the changes in value over the period beginning June 30, 2022 and ending December 31, 2025 of an assumed $100 investment in our common stock, S&P 500 Index and the S&P/TSX Equal Weight Global Base Metals Index, assuming the reinvestment of dividends.
| | | | | | | | | | | | | | | | | |
| 6/30/2022 | 12/31/2022 | 12/31/2023 | 12/31/2024 | 12/31/2025 |
| Ivanhoe Electric Inc. | $100.00(1) | $139.66 | $115.86 | $86.78 | $183.68 |
S&P/TSX Equal Weight Global Base Metals Index(2) | $100.00 | $111.63 | $115.57 | $100.41 | $191.32 |
| S&P 500 Index | $100.00 | $102.31 | $129.20 | $161.53 | $190.41 |
(1) Based on the closing price of Ivanhoe common stock on June 30th, 2022 which was the closing date of our initial public offering.
(2) Amounts are converted from CAD to USD using the rate from Bank of Canada at each period end.
The stock performance graph above shall not be deemed to be “soliciting material” or to be “filed” with SEC or subject to the liabilities of Section 18 under the Exchange Act. In addition, it shall not be deemed incorporated by reference by any statement that incorporates this Annual Report by reference into any filing under the Securities Act or the Exchange Act, except to the extent that we specifically incorporate this information by reference.
Item 6. Reserved
Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations
The following discussion and analysis of our financial condition and results of operations should be read in conjunction with our consolidated financial statements and the related notes to those statements included elsewhere in this Annual Report. In addition to historical financial information, the following discussion and analysis contains forward-looking statements that involve risks, uncertainties and assumptions. Our actual results and timing of selected events may differ materially from those anticipated in these forward-looking statements as a result of many factors, including those discussed under Item 1A. Risk Factors and elsewhere in this Annual Report. See “Cautionary Note Regarding Forward-Looking Statements.”
Business Overview
We are a technology-driven United States minerals exploration and development company with a focus on copper and other critical metals vital to electric transmission and generation, manufacturing, infrastructure development, technology, and national security. Our wholly owned assets are located in the United States. We operate exploration joint ventures and alliances in Saudi Arabia, Chile and the United States. We use our powerful Typhoon™ geophysical surveying system, together with advanced data analytics provided by our 94.3%-owned subsidiary, Computational Geosciences Inc. (“CGI”), to accelerate and de-risk the mineral exploration process in the search for new deposits of critical metals that may otherwise be undetectable by traditional exploration technologies. We believe the United States is significantly underexplored and has the potential to yield major new discoveries of critical metals.
Through the advancement of our portfolio of critical metals exploration and development projects, headlined by the Santa Cruz Copper Project in Arizona, we intend to contribute to domestic supply by developing resources that support industrial and strategic sectors. We also operate a 50/50 joint venture with Saudi Arabian Mining Company ("Maaden") to explore for minerals on ~50,000 km2 of underexplored Arabian Shield in Saudi Arabia. Finally, in 2024, we established an exploration alliance with BHP Mineral Resources Inc. (“BHP”), a subsidiary of BHP Group Limited, to search for critical minerals in the United States.
Our other mineral projects in the United States include the Tintic Project, located in Utah, the Hog Heaven Copper-Silver-Gold Project, located in Montana, the Bristol Project located in Nevada, and the Gleeson, Lomitas Negras, Globe-Miami and Perseverance Projects in Arizona.
Our other mineral projects outside of the United States include our the Alacrán Project in Colombia (the “Alacrán Copper Project”) which is owned through our approximate 60.8% interest in publicly traded company Cordoba Minerals Corp. (“Cordoba”).
In addition to our mineral projects, we also own a 90.0% controlling interest in VRB Energy, which itself owns 100% of VRB USA, an Arizona-based developer of advanced grid-scale energy storage systems utilizing vanadium redox flow batteries for integration with renewable power sources. VRB Energy also has a 49% interest in VRB China which is a joint venture with China Energy Storage Industry Co., Ltd. (“Red Sun”) a subsidiary of privately held Shanxi Red Sun Co., Ltd. VRB China manufactures, develops and sells vanadium redox flow batteries for Asian, African and Middle Eastern markets.
Our shares of common stock are listed on the NYSE American and the TSX under the ticker symbol “IE”.
Business Developments in the Year
Corporate Activities
In February 2025, we completed a public offering where we issued 11,794,872 units (the “Units”) at a price of $5.85 per Unit for gross proceeds of approximately $69.0 million, after giving effect to the underwriter’s exercise in full of its option to purchase additional Units. Each Unit consisted of (i) one share of our common stock and (ii) one accompanying warrant (the "Warrants"). Each Warrant was exercisable to purchase one share of our common stock at a price of $7.00 per share until February 17, 2026. Prior to the expiry date, all of the Warrants were exercised for additional gross proceeds of approximately $82.6 million. The net proceeds of the offering were used or are intended to be used on the preliminary feasibility study for the Santa Cruz Copper Project, drilling and other exploration activities and for other working capital and general corporate purposes.
In October 2025, we completed a public offering where we issued 11,500,000 shares of our common stock at $15.00 per share for gross proceeds of approximately $172.5 million, after giving effect to the underwriter’s exercise in full of its option to purchase additional shares of common stock. We intend to use the net proceeds from this offering to complete the remaining payments owed from the purchase of land at our Santa Cruz Copper Project in Arizona, to fund early
development activities at the Santa Cruz Copper Project, to fund exploration activities at our current projects and joint ventures, and for other working capital and general corporate purposes.
Santa Cruz Copper Project
On June 23, 2025, we announced the completion of the Preliminary Feasibility Study (the "PFS") for the Santa Cruz Copper Project in Arizona. The PFS confirmed the economic viability of an underground copper mining operation combined with a heap leach processing facility utilizing modern technologies and designed to produce copper cathode for delivery to U.S. customers. Following completion of the PFS, we are conducting optimization studies and detailed engineering as we work towards the beginning of initial construction activities in the first quarter of 2026.
Situated entirely on private land in Arizona, the Santa Cruz Copper Project integrates underground mining with chloride-assisted heap leaching to produce copper cathode on site, eliminating the need for smelting, tailings storage, and transportation and refining of concentrates. This integrated approach significantly reduces the project's overall carbon intensity.
The findings of the PFS include that the Santa Cruz Copper Project is projected to produce 1.4 million tonnes of copper cathode over a 23-year mine life. With a base case copper price of $4.25/lb, the Santa Cruz Copper Project has an estimated after-tax Net Present Value of $1.4 billion at an 8% discount rate and an estimated Internal Rate of Return (IRR) of 20%. The initial project capital estimated in the PFS is $1.24 billion.
On November 19, 2025, we announced that we accelerated and completed the final three land acquisition payments, totaling $39.3 million, at the Santa Cruz Copper Project in Arizona, satisfying all remaining terms of the 2023 Purchase and Sale Agreement with Wolff-Harvard Ventures LLC. The promissory note previously issued, and now repaid, required the full outstanding balance to be paid by us prior to commencement of major mine construction activities.
On December 12, 2025, we announced that our wholly-owned subsidiary, Mesa Cobre, which owns the Santa Cruz Copper Project, closed a $200 million senior secured multi-draw bridge facility (the “Bridge Facility”) from a syndicate of three international financial institutions. The Bridge Facility will support the development of the Santa Cruz Copper Project by providing enhanced liquidity for early construction activities and working capital requirements. The Bridge Facility is currently undrawn.
Cordoba Minerals Corp.
On May 8, 2025, Cordoba, signed a definitive Framework Agreement for the sale of the its remaining 50% interest in the Alacrán Copper Project to a consortium of investors including JCHX Mining Management Co., Ltd. (“JCHX”), a 19.2% shareholder of Cordoba, for up to $128.0 million, consisting of $88.0 million in cash on closing, $12.0 million in a deferred payment, and up to $28.0 million in a contingent payment. Cordoba shareholders approved the transaction at a meeting of shareholders held on September 15, 2025.
On February 10, 2026, the agreement was amended to, among other things, provide for the full $128.0 million purchase price to be paid at closing and remove any post-closing payments, waive the closing condition of an Environmental Impact Assessment, add a new closing condition of JCHX shareholder approval, and extend the outside date to March 10, 2026. Cordoba has also agreed to use commercially reasonable efforts to distribute to its shareholders the net proceeds after satisfying all liabilities and obligations, subject to required approvals, such that $10 million will remain in Cordoba.
Saudi Arabia Exploration Activities
On September 2, 2025, we announced that Maaden had made available an additional 1,345 square kilometers of exploration licenses to the Maaden Ivanhoe Electric Exploration and Development Limited Company ("Maaden Joint Venture") that we established with them in 2023.
Selected Financial Information
The selected financial information set forth below is presented in accordance with U.S. GAAP and is derived from our audited consolidated financial statements for the years ended December 31, 2025, 2024 and 2023. We did not declare or pay any dividends or distributions in any financial reporting period.
| | | | | | | | | | | | | | | | | |
| Year Ended December 31, |
| (In thousands, except per share amounts) | 2025 | | 2024 | | 2023 |
| Revenue | $ | 3,244 | | | $ | 2,901 | | | $ | 3,903 | |
| Cost of sales | (1,126) | | | (1,018) | | | (2,986) | |
| Gross profit | 2,118 | | | 1,883 | | | 917 | |
| Expenses: | | | | | |
| Exploration expenses | 63,287 | | | 130,944 | | | 126,719 | |
| General and administrative expenses | 39,242 | | | 44,740 | | | 48,204 | |
| Research and development expenses | 275 | | | 2,853 | | | 6,120 | |
| Net loss attributable to: | | | | | |
| Common stockholders or parent | 105,874 | | | 128,622 | | | 199,377 | |
| Comprehensive loss attributable to: | | | | | |
| Common stockholders or parent | 106,211 | | | 129,825 | | | 200,261 | |
Basic and diluted loss per share attributable to common stockholders or parent | $ | 0.79 | | | $ | 1.07 | | | $ | 1.95 | |
| Total assets | 483,273 | | | 374,932 | | | 487,226 | |
| Total non-current liabilities | 5,830 | | | 61,085 | | | 71,222 | |
Segments
We account for our business in four business segments – (i) Santa Cruz Copper Project (ii) critical metals, (iii) data processing services and (iv) energy storage.
Significant Components of Results of Operations
Revenue, Cost of Sales and Gross Profit
We have not generated any revenue from our mineral projects because they are in the exploration or development stage.
We generate some revenue from our technology businesses, CGI and VRB Energy, which is included in the data processing business segment and energy storage systems business segments, respectively.
CGI generates revenue from the sale of data processing services to the mining and oil and gas industries. In prior years, CGI has also generated revenue from software licensing.
VRB Energy generates revenue from developing, manufacturing and selling vanadium redox flow energy storage systems. Prior to October 2024, all of VRB Energy’s revenue was generated by VRB China. In October 2024, VRB Energy reduced its ownership interest in VRB China to 49% and commenced equity accounting for this investment. During 2025, VRB Energy was focused on progressing its Arizona-based business, VRB USA.
Exploration Expenses
Direct costs for the acquisition of mineral exploration rights, including option payments, are capitalized and recorded initially at cost as exploration properties. Exploration and evaluation costs are expensed in the period incurred until such time as it has been determined that a mineral property is commercially feasible, in which case subsequent exploration and evaluation costs incurred to develop a mineral property are capitalized. Commercial feasibility is generally established when a mineral property has proven and probable reserves, permits or rights to extract the resources and reserves have been obtained and financing to develop the property has been approved.
Exploration expenses include topographical, geological, geochemical and geophysical studies, exploratory drilling, trenching, sampling and activities in relation to identifying a Mineral Resource and then evaluating the technical feasibility and commercial viability of extracting the Mineral Resource, as well as value-added taxes in relation to these direct
exploration and evaluation costs incurred in foreign jurisdictions where recoverability of those taxes is uncertain. Exploration expenses also include salaries, benefits and non-cash stock-based compensation expenses of the employees performing these activities.
Exploration expenses also include payments under earn-in and option agreements where the option right is with respect to ownership interests in legal entities owning the underlying mineral project in the exploration project phase. Through our earn-in and option agreements, we have the right (and in some cases, the obligation) to fund and conduct exploration on the underlying mineral project prior to determining whether to acquire a minority or majority ownership interest through further funding the costs of such exploration and, in some cases, through direct payments to the owners of the project. In the event we cease making expenditures on an exploration mineral project or fail to incur the agreed level of exploration expenditures, we will not obtain an ownership right beyond any that may have been acquired as of the date of termination.
Included in exploration expenses are early stage projects and exploration costs that we incur in relation to generating new projects that may or may not proceed to earn-in agreements depending on our evaluation. These are categorized as “Project generation and other”.
General and Administrative Expenses
Our general and administrative expenses consist of salaries and benefits, stock-based compensation, professional and consultant fees, insurance and other general administration costs.
Year Ended December 31, 2025 Compared to Year Ended December 31, 2024
For the year ended December 31, 2025 we recorded a net loss attributable to common stockholders of $105.9 million ($0.79 per share), compared to $128.6 million ($1.07 per share) for the year ended December 31, 2024, which was a decrease of $22.7 million. Significant contributors to this decrease in the loss for year ended December 31, 2025 included a decrease of $67.7 million in exploration expenditures, a decrease of $5.5 million in general and administrative expenditures and a decrease of $3.1 million in the share of loss of equity method investee when compared to the year ended December 31, 2024. These decreases were offset by a $10.3 million provision for credit loss expense being recorded for the year ended December 31, 2025. The net loss attributable to common stockholders for the year ended December 31, 2024 also included a one-off recognition of a $50.7 million gain on the disposal of a subsidiary, for which there was no similar amount in the year ended December 31, 2025.
Exploration expenses were $63.3 million for the year ended December 31, 2025 a decrease of $67.7 million from $130.9 million for the year ended December 31, 2024. Exploration expenses consisted of the following:
| | | | | | | | | | | | | | | |
| Year Ended December 31, | | |
| (In thousands) | 2025 | | 2024 | | |
| Exploration Expenses: | | | | | |
| Santa Cruz, USA | $ | 23,589 | | | $ | 72,384 | | | |
Alacrán, Colombia | 19,397 | | | 14,756 | | | |
| Gleeson, USA | 2,099 | | | — | | | |
| Tintic, USA | 2,075 | | | 11,274 | | | |
| Hog Heaven, USA | 1,911 | | | 10,855 | | | |
| Project Generation and other | 14,216 | | | 21,675 | | | |
| Total | $ | 63,287 | | | $ | 130,944 | | | |
| | | | | |
During the year ended December 31, 2025, exploration expenditures largely focused on activities at:
•the Santa Cruz Copper Project where $23.6 million of exploration expenditure was incurred in the year ended December 31, 2025 compared to $72.4 million incurred in the year ended December 31, 2024. Activities during the year ended December 31, 2025 at the Santa Cruz Copper Project were focused on the technical engineering studies required to support the PFS that was released on June 23, 2025 and conducting optimization studies and detailed engineering. The exploration expenditures incurred in the year ended December 31, 2024 were significantly higher due to the activities being focused on infill resource drilling, geotechnical, hydrological, and metallurgical drilling to obtain data for the technical studies; and
•the Alacrán Project where $19.4 million of exploration expenditure was incurred by Cordoba in the year ended December 31, 2025 compared to $14.8 million in the year ended December 31, 2024. Activities during the year ended December 31, 2025, focused on detailed engineering design of the Alacran mine and consultation associated with the EIA Approval process.
General and administrative expenses were $39.2 million for the year ended December 31, 2025, a decrease of $5.5 million from $44.7 million in the year ended December 31, 2024. Several items contributed to the decrease, including a $3.3 million decrease in administration expenditures at VRB for the year ended December 31, 2025, compared to the year ended December 31, 2024 as a result of 2024 including general and administration costs related to VRB China which was deconsolidated in October 2024 and therefore there were no similar amounts in 2025. In addition, there was a $2.1 million decrease in non-cash stock-based compensation expense from $11.9 million for the year ended December 31, 2024 to $9.8 million for the year ended December 31, 2025 primarily due to a change in the mix of long-term incentive compensation issued for our 2025 annual grants as we issued performance-based restricted share units (“PSU’s”) instead of stock options which have different vesting schedule.
The $10.3 million provision for credit loss expense for the year ended December 31, 2025 relates to the recording of a provision for expected credit loss recorded for the full amount of the second tranche payment due from Red Sun in relation to the October 2024 sale of 51.0% of VRB China. The second tranche payment was due on June 30, 2025 and has not been received. The expected credit loss has been recorded due to prolonged delinquency, repeated unfulfilled payment promises from Red Sun, an absence of contractual modification and a high degree of risk and uncertainty with cross-border collection risk and contractual remedies.
Revenue for the year ended December 31, 2025 was $3.2 million, an increase of $0.3 million from $2.9 million for the year ended December 31, 2024. CGI’s software licensing and data processing services to the mining and oil and gas industries represented 100% of our revenue for the year ended December 31, 2025 ($3.2 million) and 98% for the year ended December 31, 2024 ($2.8 million). VRB Energy had no revenue for the year ended December 31, 2025 and $0.1 million for the year ended December 31, 2024.
| | | | | | | | | | | | | | | | | |
| Year Ended December 31, | | |
| 2025 | | 2024 | | Percentage change year-over-year |
| (In thousands) | | | | | |
| CGI: Software licensing and data processing services: | | | | | |
| Revenue | $ | 3,244 | | | $ | 2,831 | | | 15 | % |
| Cost of sales | (1,126) | | | (966) | | | (17) | % |
| Gross profit | 2,118 | | | 1,865 | | | 13 | % |
| VRB Energy: Energy storage systems: | | | | | |
| Revenue | $ | — | | | $ | 70 | | | (100) | % |
| Cost of sales | — | | | (52) | | | 100 | % |
| Gross profit | — | | | 18 | | | (100) | % |
| Total | | | | | |
| Revenue | $ | 3,244 | | | $ | 2,901 | | | 12 | % |
| Cost of sales | (1,126) | | | (1,018) | | | (11) | % |
| Gross profit | 2,118 | | | 1,883 | | | 12 | % |
CGI’s revenue for the year ended December 31, 2025 was $3.2 million, an increase of $0.4 million from $2.8 million for the year ended December 31, 2024. The increase of $0.4 million in CGI’s revenue in 2025 was a result of more data processing services being contracted for by customers than in 2024. CGI’s gross profit for the year ended December 31, 2025 was $2.1 million, a $0.3 million increase from $1.9 million for the year ended December 31, 2024. The increase in CGI's gross profit was consistent with the increase in revenue.
VRB Energy’s energy storage system revenue for the year ended December 31, 2025 was $nil, a decrease of $0.1 million from $0.1 million for the year ended December 31, 2024. Due to the nature of VRB Energy’s contracts, revenue is typically recognized when an energy storage system is installed and commissioned. VRB Energy did not complete any installations or commissionings during the year ended December 31, 2025 as it was establishing an Arizona-based business. VRB Energy did record minor ancillary revenue of $0.1 million in 2024 related to sales of certain monitoring system components by VRB China prior to VRB China being deconsolidated.
Year Ended December 31, 2024 Compared to Year Ended December 31, 2023
For the year ended December 31, 2024 we recorded a net loss attributable to common stockholders of $128.6 million ($1.07 per share), compared to $199.4 million ($1.95 per share) for the year ended December 31, 2023, which was a decrease of $70.8 million. Significant contributors to this decrease in the loss for the year ended December 31, 2024 included the recognition of a $50.7 million gain on the disposal of a subsidiary and a decrease of $27.3 million in share of loss of equity method investees.
Exploration expenses were $130.9 million for the year ended December 31, 2024 an increase of $4.2 million from $126.7 million for the year ended December 31, 2023. Exploration expenses consisted of the following:
| | | | | | | | | | | | |
| Year Ended December 31, | |
| (In thousands) | 2024 | | 2023 | |
| Exploration Expenses: | | | | |
| Santa Cruz, USA | $ | 72,384 | | | $ | 57,203 | | |
Alacrán, Colombia | 14,756 | | | 28,068 | | |
| Tintic, USA | 11,274 | | | 13,131 | | |
| Hog Heaven, USA | 10,855 | | | 7,812 | | |
| Project Generation and other | 21,675 | | | 20,505 | | |
| Total | $ | 130,944 | | | $ | 126,719 | | |
During the year ended December 31, 2024, exploration expenditures largely focused on exploration activities at:
•the Santa Cruz Copper Project where $72.4 million of exploration expenditure was incurred in the year ended December 31, 2024 compared to $57.2 million incurred in the year ended December 31, 2023. Activities during the year ended December 31, 2024 at Santa Cruz were focused on a program of infill resource drilling, geotechnical, hydrological, and metallurgical drilling/laboratory testing along with advancing permitting and technical studies required to support a prefeasibility study;
•the Alacrán Project where $14.8 million of exploration expenditure was incurred by Cordoba in the year ended December 31, 2024 compared to $28.1 million in the year ended December 31, 2023. Activities during the year ended December 31, 2024, focused on preparing for and commencing detailed engineering design of the Alacran Project;
•the Tintic Project where $11.3 million of exploration expenditure was incurred in the year ended December 31, 2024 compared to $13.1 million in the year ended December 31, 2023. Activities during the year ended December 31, 2024 at Tintic were focused on diamond drilling in the Mammoth area; and
•the Hog Heaven Project in Montana where $10.9 million of exploration expenditure was incurred in the year ended December 31, 2024 compared to $7.8 million in the year ended December 31, 2023. Activities during the year ended December 31, 2024 at Hog Heaven were focused on diamond drilling in the Flathead Mine, West Flathead and Battle Butte areas.
General and administrative expenses were $44.7 million for the year ended December 31, 2024, a decrease of $3.5 million from $48.2 million in the year ended December 31, 2023. Several items contributed to the decrease, including a $5.8 million decrease in non-cash stock-based compensation expense from $17.7 million for the year ended December 31, 2023 to $11.9 million for the year ended December 31, 2024 primarily due to less Ivanhoe Electric stock option and restricted stock units (“RSUs”) grants occurring in 2024 than 2023 due to 2023 including increased stock based compensation grants as we expanded our management team. This decrease was offset by a $2.4 million increase in salary and wages from $4.7 million for the year ended December 31, 2023 to $7.1 million for the year ended December 31, 2024. The increase in salary and wages was due to the creation of a Company short term incentive program in which bonuses of $1.8 million were expensed as general and administrative costs in March 2024 and also the impact of additional compensation costs related to building out our management and administrative teams to appropriately support our activities as a public company.
During the year ended December 31, 2024, we recorded $8.7 million share of loss of equity method investees which was a decrease of $27.3 million from the $36.0 million share of loss of equity method investee recorded for the year ended December 31, 2023. The decrease in loss was due to the year ended December 31, 2023 including our recognition of a
$33.0 million share of loss from the Maaden joint venture upon its formation due to the expensing of the land access rights in accordance with our accounting policy for exploration and evaluation costs.
The $50.7 million gain on the disposal of a subsidiary resulted from the sale of our 51% interest in VRB China. As a result of the sale, we de-consolidated VRB China as of October 31, 2024 and accounted for our retained interest in VRB China using the equity method of accounting. We have recorded our retained interest in VRB China at a fair value of $35.8 million and recognized a gain on the sale of the controlling interest of VRB China of $50.7 million.
Revenue for the year ended December 31, 2024 was $2.9 million, a decrease of $1.0 million from $3.9 million for the year ended December 31, 2023. CGI’s software licensing and data processing services to the mining and oil and gas industries represented 98% of our revenue for the year ended December 31, 2024 ($2.8 million) and 33% for the year ended December 31, 2023 ($1.3 million). VRB Energy’s energy storage system revenue represented 2% of our revenue for the year ended December 31, 2024 ($0.1 million) and 67% for the year ended December 31, 2023 ($2.6 million).
| | | | | | | | | | | | | | | | | |
| Year Ended December 31, | | |
| 2024 | | 2023 | | Percentage change year-over-year |
| (In thousands) | | | | | |
| CGI: Software licensing and data processing services: | | | | | |
| Revenue | $ | 2,831 | | | $ | 1,300 | | | 118 | % |
| Cost of sales | (966) | | | (497) | | | (94) | % |
| Gross profit | 1,865 | | | 803 | | | 132 | % |
| VRB Energy: Energy storage systems: | | | | | |
| Revenue | $ | 70 | | | $ | 2,603 | | | (97) | % |
| Cost of sales | (52) | | | (2,489) | | | 98 | % |
Gross profit | 18 | | | 114 | | | (85) | % |
| Total | | | | | |
| Revenue | $ | 2,901 | | | $ | 3,903 | | | (26) | % |
| Cost of sales | (1,018) | | | (2,986) | | | 66 | % |
| Gross profit | 1,883 | | | 917 | | | 105 | % |
CGI’s revenue for the year ended December 31, 2024 was $2.8 million, an increase of $1.5 million from $1.3 million for the year ended December 31, 2023. The increase of $1.5 million in CGI’s revenue in 2024 was a result of more data processing services being contracted for by customers than in 2023. CGI’s gross profit for the year ended December 31, 2024 was $1.9 million, a $1.1 million increase from $0.8 million for the year ended December 31, 2023. The increase in CGI's gross profit was consistent with the increase in revenue.
VRB Energy’s energy storage system revenue for the year ended December 31, 2024 was $0.1 million, a decrease of $2.5 million from $2.6 million for the year ended December 31, 2023. Due to the nature of VRB Energy’s contracts, revenue is typically recognized when an energy storage system is installed and commissioned. VRB Energy did not complete any installations or commissionings during the year ended December 31, 2024. VRB Energy did record minor ancillary revenue of $0.1 million related to sales of certain monitoring system components by VRB China in October 2024 prior to VRB China being deconsolidated. During the year ended December 31, 2023, VRB Energy delivered, installed and commissioned energy storage systems of 2.18MW/6.25MWh to customers, which resulted in $2.6 million of revenue being recognized.
Stock-Based Compensation
On March 6, 2025, as part of our long-term incentive plan the following equity incentives were granted to certain of our officers and employees:
•776,557 RSU's that vest in three equal tranches beginning one year from the grant date. The fair value of the stock-settled RSU’s is amortized over the vesting period. The total fair value of the March 6, 2025 RSU grant was $4.5 million.
•PSU's that vest on December 31, 2027, with the number of units to vest determined by our share price performance against constituents from a Base Metals Index. The number of units to vest ranges between zero times to two times the target number of PSU's. The total target number of PSU's is 714,822. The total fair value of the March 6, 2025 PSU grant was $5.1 million.
Liquidity, Capital Resources and Capital Requirements
Cash Resources
We have recurring net losses and negative operating cash flows and we expect that we will continue to operate at a loss until we are able to generate revenue from our mining projects and such revenue exceeds our expenses. We cannot assure you that any of our mining projects will advance to commercial production or be profitable once in commercial production.
We have funded our operations primarily through the sale of our equity securities.
At December 31, 2025, we had cash and cash equivalents of $173.3 million and a working capital balance of $126.3 million. Of the total cash and cash equivalents at December 31, 2025, $9.1 million was not available for the general corporate purposes of the Company as this amount was held by non-wholly-owned subsidiaries.
In addition, we received $81.5 million subsequent to December 31, 2025, as a result of approximately 11.6 million Warrants being exercised to purchase one share of our common stock at a price of $7.00 per share during January and February 2026.
As at February 23, 2026, we believe that we have sufficient cash resources and availability under the new Bridge Facility to carry out our business plans for at least the next 12 months, after which we expect to need additional financing to further advance our projects and conduct our business. We have based these estimates on our current assumptions, which may require future adjustments based on our ongoing business and development decisions. Accordingly, we may require additional cash resources earlier than we currently expect or we may need to curtail currently planned activities.
On December 12, 2025, we announced that Mesa Cobre closed a $200.0 million senior secured multi-draw Bridge Facility from a syndicate of three international financial institutions. The Bridge Facility will support the development of the Santa Cruz Copper Project by providing enhanced liquidity for early construction activities and working capital requirements. The Bridge Facility is currently undrawn.
On April 15, 2025, we received a Letter of Interest from the Export-Import Bank of the United States (“EXIM Bank”) outlining the potential to provide up to $825 million in debt financing with a 15-year repayment tenor for the development of the Santa Cruz Copper Project in Arizona through EXIM Bank’s Make More in America initiative.
EXIM Bank is the official export credit agency of the United States. It is a government agency that offers financial support to companies through means such as direct loans and loan guarantees, working capital guarantees, and export credit insurance. EXIM Bank’s Make More in America initiative and its China and Transformational Exports Program are designed to boost the United States’ competitiveness, strengthen supply chains, and reduce strategic vulnerabilities.
Following the receipt of the Letter of Interest from EXIM Bank, we are currently advancing through the formal application process. EXIM Bank will need to conduct all requisite due diligence necessary to determine if a final lending commitment would be made. Any final lending commitment will be dependent on meeting EXIM Bank’s underwriting criteria, authorization process, and finalization and satisfaction of terms and conditions. All final lending commitments must be in compliance with EXIM Bank policies as well as program, legal and eligibility requirements. We are assessing EXIM Bank’s interest together with other financing alternatives available to us for the development of the Santa Cruz Copper Project. The construction of the Santa Cruz Copper Project following a development decision will require additional capital beyond the amount that EXIM Bank may make available.
We may seek additional financing at any time through debt, equity, project specific debt, and/or other means, including asset sales. Our continued operations are dependent on our ability to obtain additional financing or to generate future cash flows. However, there can be no assurance that we will be successful in our efforts to raise additional capital on terms favorable to us, or at all.
Consolidated Cash Balances as of December 31, 2025
The table below discloses the amounts of consolidated cash disaggregated by currency denomination as of December 31, 2025 in each jurisdiction that our affiliated entities are domiciled.
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Currency by Denomination (in USD Equivalents) | | |
| US dollars | | Canadian dollars | | | Colombian Pesos | | Other | | Total |
| (In thousands) | | | | | | | | | | |
| Jurisdiction of Entity: | | | | | | | | | | |
| USA | $ | 165,726 | | | $ | 1,482 | | | | $ | — | | | $ | — | | | $ | 167,208 | |
| Canada | 1,755 | | | 770 | | | | — | | | — | | | 2,525 | |
| Colombia | 1,101 | | | — | | | | 435 | | | — | | | 1,535 | |
| Other | 1,653 | | | 297 | | | | — | | | 45 | | | 1,995 | |
| Total | $ | 170,235 | | | $ | 2,549 | | | | $ | 435 | | | $ | 45 | | | $ | 173,263 | |
| | | | | | | | | | |
Refer to Note 18 of our consolidated financial statements which outlines restrictions on transfers of net assets from our consolidated subsidiaries to the Company.
Convertible Bond — VRB Energy
On July 8, 2021, VRB Energy issued a convertible bond for gross proceeds of $24.0 million. The bond has a five-year term and interest accrues at a rate of 8% per annum. Prior to the maturity date, the convertible bond will be automatically converted into equity of VRB Energy upon an equity financing or sale event, at a price per share equal to the lower of (A) the transaction price of the equity financing or sale event, and (B) the valuation cap price of $158.0 million divided by the total shares outstanding at the time of the event. If no equity financing or sale event occurs or other agreed restructuring of the convertible bond with its holder occurs, VRB Energy must repay the outstanding principal and interest on maturity in July 2026. At December 31, 2025, the balance of principal and interest on the bond was $33.7 million and it is classified as a current liability on the balance sheet.
Bridge Facility - Mesa Cobre
On December 12, 2025, Mesa Cobre, closed a senior secured multi-draw Bridge Facility which will support the development of the Santa Cruz Copper Project by providing enhanced liquidity for early construction activities and working capital requirements. The Bridge Facility has a two-year maturity term, with a single repayment at maturity. It will bear interest at our election, either at (i) the forward-looking term rate based on the Secured Overnight Financing Rate administered by the Federal Reserve Bank of New York plus a margin of 5.0%, increasing by 0.5% on each of the 6th, 12th, and 18th month following the closing date, or (ii) the alternate base rate as defined in the Bridge Facility agreements. At December 31, 2025, the Bridge Facility was undrawn.
In connection with the Bridge Facility, (i) Mesa Cobre entered into a security agreement which granted a first priority lien on substantially all of its assets, subject to customary exceptions, (ii) Ivanhoe Electric guaranteed Mesa Cobre’s payment obligations pursuant to a guaranty agreement whereby Ivanhoe Electric agrees to maintain at all times a tangible net worth of not less than $225.0 million, (iii) Ivanhoe Electric pledged its shares of Mesa Cobre pursuant to a pledge agreement, and (iv) Mesa Cobre executed a deed of trust and assignment of rents with respect to Mesa Cobre’s real property rights.
Cash Flows
The following table presents our sources and uses of cash for the periods indicated:
| | | | | | | | | | | | | | | | | |
| Year Ended December 31, |
| (In thousands) | 2025 | | 2024 | | 2023 |
| Net cash (used in) provided by: | | | | | |
| Operating activities | $ | (89,200) | | | $ | (162,096) | | | $ | (150,515) | |
| Investing activities | 4,587 | | | (14,470) | | | (150,766) | |
| Financing activities | 214,722 | | | 18,895 | | | 366,454 | |
| Effect of foreign exchange on cash | 855 | | | (2,063) | | | 210 | |
| Total change in cash | $ | 130,964 | | | $ | (159,734) | | | $ | 65,383 | |
| | | | | |
Operating activities.
Net cash used in operating activities for all periods presented largely was spent on our exploration expenses and our general and administrative costs. We do not generate adequate cash from operations to cover our operating expenses and therefore rely on our financing activities to provide the cash resources to fund our operating and investing activities.
The net cash used in operating activities for the year ended December 31, 2025 of $89.2 million primarily was the result of $61.1 million of cash exploration expenditures and $29.4 million of cash general and administrative costs.
The net cash used in operating activities for the year ended December 31, 2024 of $162.1 million primarily was the result of $126.5 million of cash exploration expenditures and $32.8 million of cash general and administrative costs.
The net cash used in operating activities for the year ended December 31, 2023 of $150.5 million primarily was the result of $120.2 million of cash exploration expenditures and $30.5 million of cash general and administrative costs.
Investing activities.
Our investing activities generally relate to acquisitions of mineral property interests, purchases of shares in companies that we may partner with and capital expenditures at our projects.
Net cash provided by investing activities for the year ended December 31, 2025 of $4.6 million was partly attributable to $9.7 million of proceeds received in February 2025 from the October 2024 sale of VRB China. This receipt was offset by $2.8 million of deposits made for capital expenditures at the Santa Cruz Copper Project, $1.2 million of property, plant and equipment acquisitions and $1.1 million of payments for mineral interests.
Net cash used in investing activities for the year ended December 31, 2024 of $14.5 million was mainly attributable to $10.6 million related to acquisitions of exploration properties and $1.1 million for purchases of investments subject to significant influence. The $10.6 million of cash used for purchases of exploration properties largely consisted of a payment of $10.3 million for the Santa Cruz Copper Project. In addition, we acquired cash of $0.2 million when we commenced consolidating Sama Nickel Corporation in March 2024.
Net cash used in investing activities for the year ended December 31, 2023 of $150.8 million was mainly attributable to $80.5 million related to acquisitions of exploration properties and $68.7 million for purchases of investments subject to significant influence. The $80.5 million of payments for exploration properties, included $76.6 million paid to acquire land at the Santa Cruz Copper Project and $3.5 million of option payments at our Tintic Project. The $68.7 million for purchases of investments subject to significant influence primarily consists of our $66.0 million investment in the Maaden Joint Venture.
Financing activities.
During the year ended December 31, 2025, the net cash provided by financing activities of $214.7 million was primarily a result of $231.1 million raised in two public offerings that we completed in 2025. In February 2025, we completed a public offering where we issued 11,794,872 units (the “Units”) at a price of $5.85 per Unit for net proceeds of approximately $65.8 million Each Unit consisted of (i) one share of our common stock and (ii) one accompanying warrant. In October 2025, we completed a public offering where we issued 11,500,000 shares of our common stock at $15.00 per share for net proceeds of approximately $165.3 million. We also received $6.0 million from the exercise of stock options and warrants during the year ended December 31, 2025.
In addition, in November 2025, we accelerated and completed the final three land acquisition payments, totaling $39.3 million, at the Santa Cruz Copper Project in Arizona, The promissory note previously issued, and now repaid, required the full outstanding balance to be paid by Ivanhoe Electric prior to commencement of major mine construction activities.
Also during the year ended December 31, 2025, our subsidiary, Cordoba received a $5.0 million bridge loan from JCHX which was in addition to $5.0 million which was previously received in December 2024. On June 25, 2025, JCHX paid Cordoba $20.0 million which was the third installment under the strategic arrangement signed in 2023 whereby JCHX acquired its 50% ownership of the Alacrán Copper Project. On June 26, 2025, Cordoba repaid the $10.0 million bridge loan using the proceeds from the third installment.
During the year ended December 31, 2024, there were no significant financing activities as we continued to fund our operations with the proceeds from our September 2023 public offering. Our subsidiary, Cordoba, raised $26.4 million during the year ended December 31, 2024 in relation to financing its Alacran project through its strategic arrangement with JCHX and also received a $5.0 million bridge loan from JCHX. During the year ended December 31, 2024, we also made a $12.1 million repayment of the promissory note.
During the year ended December 31, 2023, there was $366.5 million of net cash provided by financing activities which was primarily from the $319.6 million in net proceeds we raised through issuances our common stock. We raised net proceeds of $123.7 million as a result of the July 2023 private placement with Maaden and raised net proceeds of $175.5 million from our September 2023 public offering. In October 2023, we received approximately $20.0 million from Maaden exercising their “top-up right” to maintain their 9.9% interest. In addition, we received $3.4 million of proceeds from the exercise of employee stock options during the year ended December 31, 2023. Our subsidiary, Cordoba, raised $39.5 million during the year ended December 31, 2023 in relation to financing its Alacran project through its strategic arrangement with JCHX.
Material Cash Obligations
As of December 31, 2025, we had the following material known cash obligations:
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Material Cash Obligations (in thousands) |
| Total | | 2026 | | 2027-2028 | | 2029-2030 | | 2031 onwards |
Convertible debt(1) | $ | 33,738 | | | $ | 33,738 | | | $ | — | | | $ | — | | | $ | — | |
| Leases | 2,397 | | | 1,253 | | | 1,144 | | | — | | | — | |
| Typhoon purchase obligations | 1,975 | | | 988 | | | 988 | | | — | | | — | |
| Mineral property obligations (non-discretionary) | 652 | | 652 | | — | | — | | — |
| Total material cash obligations | $ | 38,762 | | | $ | 36,631 | | | $ | 2,132 | | | $ | — | | | $ | — | |
___________
(1)The $24.0 million convertible bond issued by VRB Energy matures in 2026 if not converted to common shares of VRB Energy prior to such date. As of December 31, 2025, the value of the convertible bond including accrued interest was $33.7 million.
Off Balance Sheet Arrangements
As of December 31, 2025, we were not involved in any off-balance sheet arrangements that have or are reasonably likely to have a material effect on our financial condition, results of operations, or liquidity.
Related Party Transactions
See Note 20 of our consolidated financial statements for the years ended December 31, 2025 and 2024.
Critical Accounting Estimates
Our management’s discussion and analysis of our financial condition and results of operations is based on our consolidated financial statements which have been prepared in accordance with U.S. GAAP. The preparation of these financial statements requires us to make estimates and assumptions that affect the reported amounts of assets, liabilities, revenues and expenses, as well as the disclosure of contingent assets and liabilities as of the date of our financial statements.
Below are the accounting matters that we believe are critical to our financial statements due to the degree of uncertainty regarding the estimates or assumptions involved and the magnitude of the asset, liability, revenue, expense, gain or loss being reported. Actual results may vary from our estimates in amounts that may be material to the financial statements. An accounting estimate is deemed to be critical if it requires an accounting estimate to be made based on assumptions about matters that are highly uncertain at the time the estimate is made, and if different estimates that reasonably could have been used or changes in the accounting estimates that are reasonably likely to occur periodically, could materially impact our financial statements.
We base our assumptions and estimates on historical experience and various other sources that we believe to be reasonable under the circumstances. Actual results may differ from the estimates we calculate due to changes in circumstances, global economics and politics and general business conditions. A summary of our significant accounting policies are detailed in Note 2 to our consolidated financial statements included in this Annual Report. We have outlined below those policies identified as being critical to the understanding of our business and results of operations and that require the application of significant management judgment in developing estimates.
Recoverable value of exploration mineral interests
We review and evaluate exploration mineral interests for impairment when events or changes in circumstances indicate that the carrying amount of an asset may not be recoverable. The recoverability of our exploration mineral interests and intangible assets did not involve significant estimation in the periods presented as circumstances did not indicate the carrying amount of our assets may not be recoverable. However, the recoverability of our recorded mineral interests is subject to market factors that could significantly affect the recoverability of our assets, such as commodity prices, results of exploration activities that may affect our intentions to continue under option or earn-in agreements and geopolitical circumstances. By nature, significant changes in these factors are reasonably possible to occur periodically, which could materially impact our financial statements.
Stock-based compensation
Compensation expense for PSU's granted to certain of our officers and employees is determined based on estimated fair values of the PSU's at the time of grant using a Monte Carlo valuation model, which requires the input of the following subjective assumptions:
| | | | | |
| Grant date: March 6, 2025 |
| Expected volatility | 63.4 | % |
| Expected life of PSU's (in years) | 2.75 |
| USA risk-free interest rate | 4.0 | % |
| Canada risk-free interest rate | 2.6 | % |
| Expected dividend rate | 0 | % |
| Weighted average grant-date fair value (per unit) | $ | 7.07 | |
Income taxes
We make estimates and judgments in determining the provision for income tax expense, deferred tax assets and liabilities and liabilities for unrecognized tax benefits, including interest and penalties. We are subject to income tax laws in many jurisdictions, including the United States, Colombia, Canada, Australia, the Ivory Coast and Peru.
We report income tax in accordance with U.S. GAAP, which requires the establishment of deferred tax accounts for all temporary differences between the financial reporting and tax bases of assets and liabilities, using currently enacted tax rates. In addition, deferred tax accounts must be adjusted to reflect new rates if enacted into law.
Realization of deferred tax assets is contingent on the generation of future taxable income. As a result, we consider whether it is more likely than not that all or a portion of such assets will be realized during periods when they are available,
and if not, we provide a valuation allowance for amounts not likely to be recognized. In determining our valuation allowance, we have not assumed future taxable income from sources other than the reversal of existing temporary differences. The extent to which a valuation allowance is warranted may vary as a result of changes in our estimates of future taxable income. In addition to the potential generation of future taxable income through the establishment of economic feasibility, development and operation of mines on our exploration assets, estimates of future taxable income could change in the event of disposal of assets, the identification of tax-planning strategies or changes in tax laws that would allow the benefits of future deductible temporary differences in certain entities or jurisdictions to be offset against future taxable temporary differences in other entities or jurisdictions.
We recognize the effect of uncertain income tax positions if those positions are more likely than not of being sustained. The amount recognized is subject to estimates and our judgment with respect to the likely outcome of each uncertain tax position. The amount that is ultimately incurred for an individual uncertain tax position or for all uncertain tax positions in the aggregate could differ from the amount recognized. We had no uncertain tax positions as of December 31, 2025.
Item 7A. Quantitative and Qualitative Disclosures About Market Risk
Interest Rate Risk
We have both fixed-rate and variable-rate debt.
Fixed-rate debt. Our fixed rate debt at December 31, 2025 consisted of a $33.7 million convertible bond that has a fixed interest rate of 8.0% per annum. The convertible bond is accounted for at amortized cost. Any changes in the market interest rates associated with this financial instrument would not impact our net loss, comprehensive loss or future cash flows.
Variable-rate debt. Our variable rate debt at December 31, 2025 was $nil, However, we have an undrawn $200.0 million Bridge Facility at December 31, 2025, related to the Santa Cruz Copper Project, which when drawn will have an interest rate equal to the secured overnight financing rate plus 5.0%.
Foreign Currency Risk
Our functional currency is the U.S. dollar. The majority of our expenditure is incurred in U.S. dollars at our projects located in the United States and are not subject to foreign currency risk. Outside of the United States, we are subject to foreign currency risk when we undertake transactions in foreign currencies, particularly certain operating expenditures incurred in Colombia and Canada. As the exchange rates between the U.S. dollar and our foreign currencies fluctuate, we experience foreign exchange gains and losses.
The carrying amounts of the Company’s Colombian Pesos and Canadian dollar denominated monetary assets and liabilities at the respective statement of financial position dates are as follows:
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Colombian Peso Balance (in 000’s USD Equivalent) | | Canadian Dollar Balance (in 000’s USD Equivalent) |
| December 31, 2025 | | December 31, 2024 | | December 31, 2023 | | December 31, 2025 | | December 31, 2024 | | December 31, 2023 |
| Cash | $ | 435 | | | $ | 4,851 | | | $ | 3,233 | | | $ | 2,549 | | | $ | 2,663 | | | $ | 667 | |
| Other receivables | 5 | | | 2 | | | 69 | | | 129 | | | 189 | | | 551 | |
| Accounts payable and accrued liabilities | (2,472) | | | (1,204) | | | (1,983) | | | (1,290) | | | (81) | | | (443) | |
| Other liabilities | (1,173) | | | (1,400) | | | (955) | | | — | | | — | | | — | |
| $ | (3,206) | | | $ | 2,249 | | | $ | 364 | | | $ | 1,388 | | | $ | 2,771 | | | $ | 775 | |
| | | | | | | | | | | | | | | | | |
| Year Ended December 31, |
| 2025 | | 2024 | | 2023 |
| Opening exchange rate (1 U.S. dollar to Colombian Pesos) | 4,403 | | | 3,872 | | | 4,841 | |
| Closing exchange rate (1 U.S. dollar to Colombian Pesos) | 3,733 | | | 4,403 | | | 3,872 | |
| Appreciation/(devaluation) of Colombian Peso | 15.2 | % | | (13.7) | % | | 20.0 | % |
| | | | | |
| Opening exchange rate (1 U.S. dollar to Canadian dollars) | $ | 1.44 | | | $ | 1.32 | | | $ | 1.35 | |
| Closing exchange rate (1 U.S. dollar to Canadian dollars) | $ | 1.37 | | | $ | 1.44 | | | $ | 1.32 | |
| Appreciation/(devaluation) of Canadian dollar | 4.7 | % | | (8.8) | % | | 2.4 | % |
As at December 31, 2025, a 10% depreciation or appreciation of these foreign currencies against the U.S. dollar would have resulted in an approximate $0.2 million decrease or increase in the Company’s net loss for the year ended December 31, 2025 (December 31, 2024 - $0.5 million, December 31, 2023 - $0.1 million).
Item 8. Financial Statements and Supplementary Data
Report of Independent Registered Public Accounting Firm
To the Shareholders and the Board of Directors of Ivanhoe Electric Inc.
Opinion on the Financial Statements
We have audited the accompanying consolidated balance sheets of Ivanhoe Electric Inc. and subsidiaries (the "Company") as of December 31, 2025 and 2024, the related consolidated statements of loss and comprehensive loss, changes in equity, and cash flows, for each of the three years in the period ended December 31, 2025, and the related notes and the schedule listed in the Index at Item 15 (collectively referred to as the "financial statements"). In our opinion, the financial statements present fairly, in all material respects, the financial position of the Company as of December 31, 2025 and 2024, and the results of its operations and its cash flows for each of the three years in the period ended December 31, 2025, in conformity with accounting principles generally accepted in the United States of America.
We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), the Company's internal control over financial reporting as of December 31, 2025, based on criteria established in Internal Control - Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission and our report dated February 23, 2026, expressed an unqualified opinion on the Company's internal control over financial reporting.
Basis for Opinion
These financial statements are the responsibility of the Company's management. Our responsibility is to express an opinion on the Company's financial statements based on our audits. We are a public accounting firm registered with the PCAOB and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.
We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement, whether due to error or fraud. Our audits included performing procedures to assess the risks of material misstatement of the financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the financial statements. Our audits also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the financial statements. We believe that our audits provide a reasonable basis for our opinion.
Critical Audit Matter
The critical audit matter communicated below is a matter arising from the current-period audit of the financial statements that was communicated or required to be communicated to the audit committee and that (1) relates to accounts or disclosures that are material to the financial statements and (2) involved our especially challenging, subjective, or complex judgments. The communication of critical audit matters does not alter in any way our opinion on the financial statements, taken as a whole, and we are not, by communicating the critical audit matter below, providing a separate opinion on the critical audit matter or on the accounts or disclosures to which it relates.
Exploration Properties — Assessment of Whether Indicators of Impairment Exist — Refer to Notes 3(i) and 9 to the financial statements.
Critical Audit Matter Description
The Company’s determination of whether or not an indicator of impairment exists in its exploration properties requires significant management judgment. Auditing the Company’s assessment of whether an indicator of impairment existed required increased auditor attention due to the judgments made by management when determining whether events or changes in circumstances could indicate a potential impairment. This resulted in an increased extent of audit effort.
How the Critical Audit Matter Was Addressed in the Audit
Our audit procedures related to the assessment of whether an indicator of impairment existed in exploration properties included the following, among others:
•Evaluated the effectiveness of the Company’s controls over management’s assessment of indicators of impairment.
•Obtained management’s assessment and evaluated whether: a) the Company has the right to explore in the relevant exploration area; b) there are adverse changes in the business climate, including decreases in forecasted future metal prices; c) the Company has the ability and intent to carry out significant exploration activities; d) there are planned or budgeted substantive expenditures to support exploration activities; and e) there exists a prolonged market capitalization deficiency.
/s/ Deloitte LLP
Chartered Professional Accountants
Vancouver, Canada
February 23, 2026
We have served as the Company's auditor since 2021.
Report of Independent Registered Public Accounting Firm
To the Shareholders and the Board of Directors of Ivanhoe Electric Inc.
Opinion on Internal Control over Financial Reporting
We have audited the internal control over financial reporting of Ivanhoe Electric Inc. and subsidiaries (the “Company") as of December 31, 2025, based on criteria established in Internal Control - Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). In our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, 2025, based on criteria established in Internal Control - Integrated Framework (2013) issued by COSO.
We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), the consolidated financial statements as of and for the year ended December 31, 2025, of the Company and our report dated February 23, 2026, expressed an unqualified opinion on those financial statements.
Basis for Opinion
The Company's management is responsible for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting, included in the accompanying Management's Annual Report on Internal Control Over Financial Reporting. Our responsibility is to express an opinion on the Company's internal control over financial reporting based on our audit. We are a public accounting firm registered with the PCAOB and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.
We conducted our audit in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audit included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, testing and evaluating the design and operating effectiveness of internal control based on the assessed risk, and performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinion.
Definition and Limitations of Internal Control over Financial Reporting
A company’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company’s internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company’s assets that could have a material effect on the financial statements.
Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.
/s/ Deloitte LLP
Chartered Professional Accountants
Vancouver, Canada
February 23, 2026
IVANHOE ELECTRIC INC.
CONSOLIDATED BALANCE SHEETS
(Expressed in thousands of U.S. dollars)
At December 31, 2025 and 2024
| | | | | | | | | | | |
| 2025 | | 2024 |
| Assets | | | |
| Current assets: | | | |
| Cash and cash equivalents | $ | 173,263 | | | $ | 40,971 | |
| Restricted cash | 3,010 | | | 4,338 | |
| Accounts and other receivables | 526 | | | 21,569 | |
| Prepaid expenses and deposits | 3,394 | | | 2,408 | |
| 180,193 | | | 69,286 | |
| Non-current assets: | | | |
| Investments subject to significant influence | 58,399 | | | 64,887 | |
| Other investments | 1,221 | | | 1,745 | |
| Exploration properties | 224,145 | | | 225,876 | |
| Property, plant and equipment | 9,289 | | | 9,667 | |
| Other non-current assets | 10,026 | | | 3,471 | |
| Total assets | $ | 483,273 | | | $ | 374,932 | |
| Liabilities and Equity | | | |
| Current liabilities: | | | |
| Accounts payable and accrued liabilities | $ | 16,309 | | | $ | 11,121 | |
| Note payable, current | — | | | 12,409 | |
| Convertible debt | 33,738 | | | — | |
| Deferred exploration liability | 2,748 | | | 4,101 | |
| Due to related party | — | | | 5,001 | |
| Lease liabilities, current | 1,080 | | | 784 | |
| 53,875 | | | 33,416 | |
| Non-current liabilities: | | | |
| Note payable | — | | | 24,163 | |
| Convertible debt | — | | | 30,942 | |
| Deferred income taxes | 4,751 | | | 4,049 | |
| Lease liabilities, net of current portion | 1,079 | | | 1,561 | |
| Other non-current liabilities | — | | | 370 | |
| Total liabilities | 59,705 | | | 94,501 | |
| Commitments and contingencies (Note 25) | | | |
| Equity: | | | |
Common stock, par value $0.0001; 700,000,000 shares authorized; 145.5 million shares issued and outstanding as of December 31, 2025 (December 31, 2024 - 700,000,000 authorized; 120.6 million issued and outstanding) | 15 | | | 12 | |
| Additional paid-in capital | 1,055,711 | | | 802,032 | |
| Accumulated deficit | (636,001) | | | (530,127) | |
| Accumulated other comprehensive income | (3,613) | | | (3,276) | |
| Equity attributable to common stockholders | 416,112 | | | 268,641 | |
| Non-controlling interests | 7,456 | | | 11,790 | |
| Total equity | 423,568 | | | 280,431 | |
| Total liabilities and equity | $ | 483,273 | | | $ | 374,932 | |
IVANHOE ELECTRIC INC.
CONSOLIDATED STATEMENTS OF LOSS AND COMPREHENSIVE LOSS
(Expressed in thousands of U.S. dollars, except for share and per share amounts)
Years ended December 31, 2025, 2024 and 2023
| | | | | | | | | | | | | | | | | |
| 2025 | | 2024 | | 2023 |
| Revenue | $ | 3,244 | | | $ | 2,901 | | | $ | 3,903 | |
| Cost of sales | (1,126) | | | (1,018) | | | (2,986) | |
| Gross profit | 2,118 | | | 1,883 | | | 917 | |
| Operating expenses: | | | | | |
| Exploration expenses | 63,287 | | | 130,944 | | | 126,719 | |
| General and administrative expenses | 39,242 | | | 44,740 | | | 48,204 | |
| Research and development expenses | 275 | | | 2,853 | | | 6,120 | |
| Selling and marketing expenses | 26 | | | 297 | | | 276 | |
| Provision expected for credit loss | 10,304 | | | — | | | — | |
| Impairment | 2,555 | | | — | | | — | |
| Loss from operations | 113,571 | | | 176,951 | | | 180,402 | |
| Other expenses (income): | | | | | |
| Interest expense, net | 4,141 | | | 2,585 | | | 2,960 | |
| Foreign exchange loss (gain) | 553 | | | 665 | | | (1,274) | |
| Share of losses from significant influence investments | 5,550 | | | 8,668 | | | 35,952 | |
| Gain on disposal of subsidiary | — | | | (50,685) | | | — | |
| Other expenses (income), net | 1,220 | | | 2,054 | | | (1,381) | |
| Loss before income taxes | 125,035 | | | 140,238 | | | 216,659 | |
| Income taxes (recovery) | 12 | | | 32 | | | (584) | |
| Net loss | 125,047 | | | 140,270 | | | 216,075 | |
| Less loss attributable to non-controlling interests | (19,173) | | | (11,648) | | | (16,698) | |
| Net loss attributable to common stockholders or parent | 105,874 | | | 128,622 | | | 199,377 | |
| Net loss | 125,047 | | | 140,270 | | | 216,075 | |
| Other comprehensive loss, net of tax: | | | | | |
| Foreign currency translation adjustments | 65 | | | 1,028 | | | 1,359 | |
| Other comprehensive loss | 65 | | | 1,028 | | | 1,359 | |
| Comprehensive loss | $ | 125,112 | | | $ | 141,298 | | | $ | 217,434 | |
| Comprehensive loss attributable to: | | | | | |
| Common stockholders or parent | 106,211 | | | 129,825 | | | 200,261 | |
| Non-controlling interests | 18,901 | | | 11,473 | | | 17,173 | |
| $ | 125,112 | | | $ | 141,298 | | | $ | 217,434 | |
Net loss per share attributable to common stockholders or parent | | | | | |
| Basic and diluted | $ | 0.79 | | | $ | 1.07 | | | $ | 1.95 | |
| Weighted-average common shares outstanding | | | | | |
| Basic and diluted | 133,583,203 | | 120,377,904 | | 102,491,529 |
IVANHOE ELECTRIC INC.
CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
(Expressed in thousands of U.S. dollars, except for share amounts)
Years ended December 31, 2025, 2024 and 2023
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Common Stock | | Additional paid-in capital | | Accumulated deficit | | Accumulated other comprehensive income (loss) | | Non- controlling interest | | Total |
| Shares | | Amount | | |
| Balance at January 1, 2023 | 92,960,584 | | 9 | | | 409,683 | | | (202,128) | | | (1,189) | | | (3,928) | | | 202,447 | |
| Net loss | — | | — | | | — | | | (199,377) | | | — | | | (16,698) | | | (216,075) | |
| Other comprehensive loss | — | | — | | | — | | | — | | | (884) | | | (475) | | | (1,359) | |
| Issuance of common stock; public offering and subscription agreement, net of issuance costs | 15,143,279 | | 2 | | | 195,949 | | | — | | | — | | | — | | | 195,951 | |
| Issuance of common stock; strategic investment, net of issuance costs | 10,269,604 | | 1 | | | 123,670 | | | — | | | — | | | — | | | 123,671 | |
| Issuance of common stock; earn-in payment | 10,281 | | — | | | 150 | | | — | | | — | | | — | | | 150 | |
| Stock options exercised | 1,379,526 | | — | | | 3,422 | | | — | | | — | | | — | | | 3,422 | |
| Settlement of restricted share units | 250,000 | | — | | | — | | | — | | | — | | | — | | | — | |
| Settlement of deferred share units | 11,990 | | — | | | — | | | — | | | — | | | — | | | — | |
| Stock-based compensation | — | | — | | | 20,738 | | | — | | | — | | | 225 | | | 20,963 | |
| Non-controlling interests investment in subsidiary | — | | — | | | 24,258 | | | — | | | — | | | 22,896 | | | 47,154 | |
Other changes in non-controlling interests | — | | — | | | (54) | | | — | | | — | | | 11 | | | (43) | |
| Balance at December 31, 2023 | 120,025,264 | | 12 | | | 777,816 | | | (401,505) | | | (2,073) | | | 2,031 | | | 376,281 | |
| Net loss | — | | — | | | — | | | (128,622) | | | — | | | (11,648) | | | (140,270) | |
| Other comprehensive (loss) income | — | | — | | | — | | | — | | | (1,203) | | | 175 | | | (1,028) | |
| Issuance of common stock; Kaizen arrangement | 116,413 | | — | | | 952 | | | — | | | — | | | — | | | 952 | |
| Issuance of common stock; earn-in payment | 12,765 | | — | | | 95 | | | — | | | — | | | — | | | 95 | |
| Settlement of restricted share units | 304,213 | | — | | | — | | | — | | | — | | | — | | | — | |
| Settlement of deferred share units | 1,972 | | — | | | — | | | — | | | — | | | — | | | — | |
| Stock options exercised | 151,485 | | — | | | 867 | | | — | | | — | | | — | | | 867 | |
| Stock-based compensation | — | | — | | | 14,718 | | | — | | | — | | | 246 | | | 14,964 | |
| Taxes paid on net settlement of RSU's | — | | — | | | (870) | | | — | | | — | | | — | | | (870) | |
| Non-controlling interests investment in subsidiary | — | | — | | | 9,387 | | | — | | | — | | | 20,992 | | | 30,379 | |
Other changes in non-controlling interests | — | | — | | | (933) | | | — | | | — | | | (6) | | | (939) | |
| Balance at December 31, 2024 | 120,612,112 | | $ | 12 | | | $ | 802,032 | | | $ | (530,127) | | | $ | (3,276) | | | $ | 11,790 | | | $ | 280,431 | |
| Net loss | — | | — | | | — | | | (105,874) | | | — | | | (19,173) | | | (125,047) | |
| Other comprehensive (loss) income | — | | — | | | — | | | — | | | (337) | | | 272 | | | (65) | |
| Issuance of common stock; public offerings, net of issuance costs | 23,294,872 | | 3 | | | 218,656 | | | — | | | — | | | — | | | 218,659 | |
| Issuance of warrants; public offering | — | | — | | | 12,470 | | | — | | | — | | | — | | | 12,470 | |
| Settlement of restricted share units | 302,165 | | — | | | — | | | — | | | — | | | — | | | — | |
| Settlement of deferred share units | 17,532 | | — | | | — | | | — | | | — | | | — | | | — | |
| Stock options exercised | 1,131,331 | | — | | | 4,921 | | | — | | | — | | | — | | | 4,921 | |
| Warrants exercised | 150,000 | | — | | | 1,050 | | | — | | | — | | | — | | | 1,050 | |
| Stock-based compensation | — | | — | | | 11,521 | | | — | | | — | | | 136 | | | 11,657 | |
| Taxes paid on net settlement of RSU's | — | | — | | | (1,189) | | | — | | | — | | | — | | | (1,189) | |
| Non-controlling interests investment in subsidiary | — | | — | | | 6,130 | | | — | | | — | | | 14,120 | | | 20,250 | |
Other changes in non-controlling interests | — | | — | | | 120 | | | — | | | — | | | 311 | | | 431 | |
| Balance at December 31, 2025 | 145,508,012 | | $ | 15 | | | $ | 1,055,711 | | | $ | (636,001) | | | $ | (3,613) | | | $ | 7,456 | | | $ | 423,568 | |
IVANHOE ELECTRIC INC.
CONSOLIDATED STATEMENTS OF CASH FLOWS
(Expressed in thousands of U.S. dollars)
Years ended December 31, 2025, 2024 and 2023
| | | | | | | | | | | | | | | | | |
| 2025 | | 2024 | | 2023 |
| Operating activities | | | | | |
| Net loss | $ | (125,047) | | | $ | (140,270) | | | $ | (216,075) | |
Adjustments to reconcile net loss to cash provided by (used in) operating activities: | | | | | |
| Depreciation and amortization | 2,951 | | | 2,703 | | | 2,640 | |
| Stock-based compensation | 11,657 | | | 14,964 | | | 20,963 | |
| Non-cash exploration and research and development expense | 300 | | | 1,395 | | | 3,281 | |
| Interest expense | 2,796 | | | 2,899 | | | 3,707 | |
| Unrealized foreign exchange loss (gain) | 336 | | | 527 | | | (1,293) | |
| Share of losses from significant influence investments | 5,550 | | | 8,668 | | | 35,952 | |
| Gain on disposal of subsidiary | — | | | (50,685) | | | — | |
| Provision for expected credit loss | 10,304 | | | — | | | — | |
| Impairment | 2,555 | | | — | | | — | |
| Income taxes | — | | | — | | | (583) | |
| Other | 1,230 | | | 2,953 | | | (367) | |
| Changes in other operating assets and liabilities: | | | | | |
| Trade accounts receivable | 1,043 | | | 385 | | | (1,829) | |
| Operating lease liabilities | (868) | | | (1,253) | | | (966) | |
| Accounts payable and accrued liabilities | 603 | | | (7,859) | | | 1,879 | |
| Deferred exploration liability | (1,353) | | | 4,101 | | | — | |
| Other operating assets and liabilities | (1,257) | | | (624) | | | 2,176 | |
| Net cash used in operating activities | (89,200) | | | (162,096) | | | (150,515) | |
| Investing activities | | | | | |
| Purchase of exploration properties | (1,106) | | | (10,640) | | | (80,507) | |
| Purchase of property, plant and equipment and intangible assets | (1,203) | | | (2,930) | | | (1,578) | |
| Deposits paid for property, plant and equipment | (2,800) | | | — | | | — | |
| Purchase of investments subject to significant influence | — | | | (1,127) | | | (68,681) | |
| Proceeds from sale of a subsidiary | 9,696 | | | — | | | — | |
| Cash acquired on acquisition of subsidiary | — | | | 227 | | | — | |
| Net cash provided by (used in) investing activities | 4,587 | | | (14,470) | | | (150,766) | |
| Financing activities | | | | | |
| Net proceeds from issuance of common stock | 231,129 | | | — | | | 319,622 | |
| Promissory note payment | (36,244) | | | (12,081) | | | — | |
| Proceeds from related party loan | 5,000 | | | 5,000 | | | 4,000 | |
| Repayment of related party loan | (10,000) | | | — | | | — | |
| Non-controlling interests investment in subsidiary | 20,251 | | | 26,380 | | | 39,454 | |
| Proceeds from exercise of stock options and warrants | 5,971 | | | 867 | | | 3,422 | |
| Debt issuance costs | (626) | | | — | | | — | |
| Other | (759) | | | (1,271) | | | (44) | |
| Net cash provided by financing activities | 214,722 | | | 18,895 | | | 366,454 | |
| Effect of foreign exchange rate changes on cash and cash equivalents | 855 | | | (2,063) | | | 210 | |
| Increase (decrease) in cash and cash equivalents and restricted cash | 130,964 | | | (159,734) | | | 65,383 | |
| Cash, cash equivalents and restricted cash, beginning of the year | 45,309 | | | 205,043 | | | 139,660 | |
| Cash, cash equivalents and restricted cash, end of the year | $ | 176,273 | | | $ | 45,309 | | | $ | 205,043 | |
| Restricted cash, end of the year | 3,010 | | | 4,338 | | | — | |
| Cash and cash equivalents, end of the year | $ | 173,263 | | | $ | 40,971 | | | $ | 205,043 | |
| Supplemental cash flow information | | | | | |
| Interest paid | $ | 3,534 | | | $ | 4,691 | | | $ | 3,723 | |
| Cash paid for income taxes | $ | 29 | | | $ | 1,915 | | | $ | 1,203 | |
| Supplemental disclosure of non-cash investing and financing activities | | | | | |
| Issuance of common stock | $ | — | | | $ | 1,047 | | | $ | — | |
| Non-controlling interests investment in subsidiary | — | | | 4,000 | | | 10,546 | |
| Settlement of related party loan | — | | | (4,000) | | | — | |
| Note payable issued as consideration for land purchase | — | | | — | | | 82,590 | |
| Settlement of loan upon issuance of shares of subsidiary | $ | — | | | $ | — | | | $ | (10,546) | |
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
1. Background and basis of preparation:
Ivanhoe Electric Inc. (“Ivanhoe Electric” or “the Company”) is a United States based minerals exploration and development company with a focus on copper and other critical metals vital to electric transmission and generation, manufacturing, infrastructure development, technology, and national security. The Company’s mineral exploration efforts focus on copper as well as other metals including nickel, cobalt, platinum group elements, gold and silver. The Company’s portfolio of electric metals exploration projects include the Santa Cruz Copper Project in Arizona.
In addition to mineral projects in the United States, the Company also holds direct and indirect ownership interests, and in some cases controlling financial interests, in other non-U.S. mineral projects, and in proprietary mineral exploration and minerals-based technologies.
The Company holds a 50% interest in a joint venture with Saudi Arabian Mining Company Maaden (“Maaden”) to explore prospective land in Saudi Arabia.
The Company conducts the following business activities through certain subsidiaries:
•VRB Energy Inc. (“VRB”) is establishing a United States-based grid scale vanadium redox flow battery manufacturing business. Ivanhoe Electric had an ownership interest in VRB of 90.0% as at December 31, 2025 (December 31, 2024 — 90.0%). VRB also holds a 49.0% interest (December 31, 2024 - 49.0%) in VRB Energy System (Beijing) Co., Ltd. (“VRB China”) which operates in the same industry in China.
•Computational Geosciences Inc. (“CGI”), provides data analytics, geophysical modelling, software licensing and artificial intelligence services for the mineral, oil & gas and water exploration industries. Ivanhoe Electric had an ownership interest in CGI of 94.3% as at December 31, 2025 (December 31, 2024 — 94.3%).
•Cordoba Minerals Corp. (“Cordoba”) holds the Alacrán copper-gold project in northern Colombia. Ivanhoe Electric had an ownership interest in Cordoba of 60.8% as at December 31, 2025 (December 31, 2024 — 62.5%).
Basis of preparation:
These consolidated financial statements have been prepared under U.S. Generally Accepted Accounting Principles (“U.S. GAAP”).
The consolidated financial statements have been prepared on a going concern basis, which presumes the realization of assets and satisfaction of liabilities in the normal course of business.
References to “$” refer to United States dollars and “Cdn$” to Canadian dollars.
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
2. Significant accounting policies:
(a)Basis of measurement:
These consolidated financial statements have been prepared on the historical cost basis except as disclosed in these accounting policies.
(b)Principles of consolidation:
The consolidated financial statements of the Company include the accounts of those subsidiaries where it directly or indirectly has more than 50% of the voting rights and/or has control over the subsidiary. For entities controlled through less than a 100% ownership interest, a non-controlling interest is recorded to reflect the non-controlling interest’s share of the net loss and net assets of the entity.
The Company consolidates entities in which it has a controlling financial interest based on either the variable interest entity (“VIE”) or the voting interest model.
An entity is considered to be a VIE if any of the following conditions exist: (a) the total equity investment at risk is not sufficient to permit the entity to finance its activities without additional subordinated financial support, (b) the holders of the equity investment at risk, as a group, lack either the direct or indirect ability through voting rights or similar rights to make decisions that have a significant effect on the success of the entity or the obligation to absorb the entity’s expected losses or the right to receive the entity’s expected residual returns, or (c) the voting rights of some equity investors are disproportionate to their obligation to absorb losses of the entity, their rights to receive returns from an entity, or both, and substantially all of the entity’s activities either involve or are conducted on behalf of an investor with disproportionately few voting rights.
The Company consolidates entities that are VIEs when the Company determines it is the primary beneficiary. Generally, the primary beneficiary of a VIE is a reporting entity that has (a) the power to direct the activities that most significantly affect the VIE’s economic performance, and (b) the obligation to absorb losses of, or the right to receive benefits from, the VIE that could potentially be significant to the VIE.
(c)Foreign currency:
The functional currency and reporting currency of Ivanhoe Electric is the U.S. dollar. Each subsidiary determines its own functional currency based on the primary economic environment in which it operates.
(i)Foreign currency translation:
Monetary assets and liabilities denominated in currencies other than the functional currency are translated into the functional currency at the rates of exchange in effect on the balance sheet date. Transactions in currencies other than the functional currency are measured and recorded in the functional currency at the exchange rate prevailing on the transaction date, and exchange differences arising on remeasurement are recognized in net loss.
(ii)Foreign operations:
The assets and liabilities of foreign operations whose functional currency is other than the reporting currency are translated into U.S. dollars at the exchange rates in effect on the balance sheet date. Revenues, expenses, gains and losses are translated using the average rates for the year. Translation adjustments are shown as a component of other comprehensive income.
(d)Cash and cash equivalents:
Cash and cash equivalents comprise deposits held with banks and other short-term highly liquid investments with original maturities of three months or less that are readily convertible into known amounts of cash and which are subject to insignificant risk of changes in value.
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
(e)Trade accounts receivable:
Trade accounts receivable are recorded at cost and do not bear interest. Management evaluates all accounts periodically and an allowance is established based on the best facts available. Management considers historical realization data, accounts receivable aging trends, other operational trends and reasonable forecasts to estimate the collectability of receivables. After all reasonable attempts to collect a receivable have been exhausted, the receivable may be partially or fully provided for or written off, depending on the circumstances.
(f)Investments subject to significant influence:
The Company accounts for its investments over which it has significant influence or joint control, but not a controlling financial interest, using the equity method of accounting unless it has elected to account for an investment subject to significant influence at fair value.
Interests in equity-accounted investees are recognized initially at cost. Subsequently, the Company adjusts the carrying amount of the investments to fair value where the fair value option has been elected or recognizes its share of earnings or losses of the investees where applying the equity method.
Where investee’s financial information is not produced in a sufficiently timely manner for the Company to apply the equity method of accounting in its consolidated financial statements, the Company records its share of earnings and losses on a lag, not to exceed three months. When a lag period is applied, the Company discloses all material intervening events.
The Company evaluates its equity method investments for potential impairment whenever events or changes in circumstances indicate that there is an other-than-temporary decline in the value of the investment. Declines in fair value that are deemed to be other-than-temporary are charged to other expenses.
(g)Exploration properties and exploration expense:
Direct costs for the acquisition of mineral exploration rights, including option payments, are capitalized and recorded initially at cost as exploration properties. Exploration and evaluation costs are expensed in the period incurred until such time as it has been determined that a mineral property is commercially feasible, in which case subsequent exploration and evaluation costs incurred to develop a mineral property are capitalized. Commercial feasibility is generally established when a mineral property has proven and probable reserves, permits or rights to extract the resources and reserves have been obtained and financing to develop the property has been approved.
Mineral interests are not amortized until the underlying property is converted to the production stage, at which point the mineral interests are amortized over the estimated recoverable proven and probable reserves.
Exploration and evaluation costs include topographical, geological, geochemical and geophysical studies, exploratory drilling, trenching, sampling, and activities in relation to evaluating the technical feasibility and commercial viability of extracting a mineral resource, as well as value-added taxes in relation to these direct exploration and evaluation costs incurred in foreign jurisdictions when recoverability of those taxes is uncertain.
Exploration and evaluation costs include funding exploration and evaluation costs pursuant to earn-in arrangements through which the Company has the right to fund exploration and evaluation activities on assets owned by a third party and the opportunity to earn into a partial ownership position directly or indirectly in the underlying assets upon reaching specified funding thresholds. Earn-in arrangements generally provide no commitment by the Company for future funding and the Company is not entitled to any economic returns associated with the underlying mineral interests unless the Company chooses to fund to certain levels.
(h)Property, plant and equipment:
Items of property, plant and equipment are measured at cost less accumulated depreciation and any accumulated impairment losses. Major expenditures for replacements and significant improvements that increase asset values and extend useful lives are capitalized.
The cost of property, plant and equipment, less its estimated residual value, is depreciated over its estimated useful lives using the straight-line method on the following bases:
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
| | | | | | | | |
| Asset | | Basis |
| Equipment and vehicles | | 3 to 10 years |
| Computer equipment | | 3 to 5 years |
| Leasehold improvements | | Shorter of useful life and remaining lease term |
The useful lives, residual values and depreciation method are reviewed annually, with the effect of any changes in estimate accounted for on a prospective basis.
(i)Leases:
The Company assesses whether a contract is or contains a lease, at the inception of a contract. A contract is, or contains, a lease if the contract conveys the right to control the use of an identified asset for a period of time in exchange for consideration. The Company assesses whether the contract involves the use of an identified asset, whether the Company has the right to obtain substantially all of the economic benefits from use of the asset during the term of the arrangement and if the Company has the right to direct the use of the asset.
The Company recognizes a right-of-use asset (“ROU asset”) and a corresponding lease liability at the commencement of the lease, except the Company has elected not to recognize ROU assets and liabilities for leases where the total lease term is less than or equal to 12 months. The Company has elected to treat the lease and non-lease components of office leases as a single lease component.
Lease liabilities are initially measured at the present value of the unpaid lease payments at the commencement date, discounted by using the rate implicit in the lease. If this rate cannot be readily determined, the Company uses its incremental borrowing rate. Lease liabilities are subsequently measured by increasing the carrying amount to reflect interest on the lease liability and by reducing the carrying amount to reflect the lease payments made.
Operating Leases
The ROU asset is initially measured at cost, which comprises the initial amount of the lease liability adjusted for lease payments made at or before the lease commencement date, plus any initial direct costs incurred less any lease incentives received.
For operating leases, the Company records the amortization of the ROU assets and the accretion of the lease liabilities as a single lease cost on a straight-line basis over the lease term.
Finance Leases
For finance leases, the ROU asset is subsequently amortized using the straight-line method from the lease commencement date to the earlier of the end of its useful life or the end of the lease term unless the lease transfers ownership of the underlying asset to the Company or the Company is reasonably certain to exercise an option to purchase the underlying asset. In those cases, the ROU asset is amortized over the useful life of the underlying asset. Amortization of the ROU asset is included in depreciation and interest expense on the lease liability is included in interest expense.
(j)Intangible assets:
Intangible assets with finite useful lives are carried at cost less accumulated amortization and accumulated impairment losses. Amortization is recognized on a straight-line basis over the assets estimated useful lives. The estimated useful life and amortization method are reviewed at the end of each reporting period, with the effect of any changes in the estimate being accounted for on a prospective basis.
The estimated useful lives of intangibles are:
| | | | | | | | |
| Asset | | Basis |
| Patents and licenses | | 5 to 20 years |
| Software | | 1 to 5 years |
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
(k)Impairment of long-lived assets:
Long-lived assets, such as property, plant, and equipment and intangible assets subject to amortization, are reviewed for impairment whenever events or changes in circumstances indicate that the carrying amount of an asset may not be recoverable. If circumstances require a long-lived asset or asset group be tested for possible impairment, the Company first compares undiscounted cash flows expected to be generated by that asset or asset group to its carrying amount. If the carrying amount of the long-lived asset or asset group is not recoverable on an undiscounted cash flow basis, an impairment is recognized to the extent that the carrying amount exceeds its fair value. Fair value is determined through various valuation techniques, including discounted cash flow models, quoted market values or third-party independent appraisals.
(l)Revenue recognition:
The Company recognizes revenue from the following major sources:
•Data processing services;
•Sale of software licenses; and
•Sale of renewable energy storage systems.
(i)Data processing services:
The Company sells data processing services to customers in the mineral, oil & gas and water exploration industries. The Company enters into contracts with customers with single and multiple deliverables or performance obligations. General payment terms are net 15 days. A performance obligation is a promise in a contract with a customer to transfer products or services that are distinct. Determining whether products or services are distinct performance obligations that should be accounted for separately, or combined as one unit of accounting and the allocation of the transaction price to each distinct performance obligation may require significant judgment.
For short term contracts with a single deliverable, the Company recognizes revenue at the point in time when it transfers control of a distinct performance obligation to a customer. Control transfers on the agreed upon deliverable being delivered to the customer, the customer accepting the deliverable and when the Company has not retained any significant risk of future obligations with respect to the service being provided.
The Company enters into arrangements for the provision of long-term data processing services. Such services are recognized as a performance obligation satisfied over time. Revenue is recognized for these services based on the stage of completion of the contract using the most appropriate measure of progress towards complete satisfaction of the performance obligations. Payment for these services is in accordance with an agreed billing schedule and therefore either (i) a contract asset is recognized over the period in which the services are performed, representing the Company’s right to consideration for the services performed to date, or (ii) a contract liability is recognized until the corresponding services have been provided.
(ii)Sale of software licenses:
The Company enters into software license agreements where it provides the use of software to the customer. The Company recognizes revenue at the point in time that it satisfies its performance obligation by making the software available for download, meeting customer specific acceptance criteria, where applicable, and having reasonable certainty that the consideration will be received. Revenue is measured based on the consideration specified in a contract with a customer.
(iii)Sale of energy storage systems:
The Company designs, develops, and manufactures energy storage systems as products as well as energy storage solutions and operations & maintenance (“O&M”) services. Revenue is measured based on the consideration specified in a contract with a customer. The Company recognizes revenue when it satisfies a performance obligation by transferring a promised good or service to a customer.
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
Energy storage systems as products are transferred at a point in time when the customer obtains control of the product, which is typically upon shipment, delivery, installation and commissioning, depending on the contract terms.
Revenue is recognized for sales of battery storage solutions over time based on the estimated progress to completion using a cost-based input method. In applying the cost-based input method of revenue recognition, we use the actual costs incurred relative to the total estimated costs to determine progress towards contract completion and to calculate the corresponding amount of revenue and gross profit to recognize. The cost based input method of revenue recognition is considered a faithful depiction of efforts to satisfy energy storage solutions and therefore reflect the transfer of goods or services to a customer under such contracts. Costs incurred towards contract completion may include costs associated with direct materials, labor, subcontractors, and other indirect costs related to contract performance. The cost-based input method of revenue recognition requires the Company to make estimates of net contract revenues and costs to complete projects.
O&M services are transferred over time when customers receive and consume the benefits provided by the Company’s performance under the terms of service arrangements.
(m)Contingent liabilities:
(i)Asset retirement obligations:
The Company recognizes asset retirement obligations arising from regulatory, contractual or other legal requirements to perform certain property and asset reclamation activities at the end of the respective asset life. Asset retirement obligations are recorded when environmental disturbance occurs, accompanied by a legal obligation to remediate. Asset retirement obligations, or increases therein, are initially measured at fair value and subsequently adjusted for accretion expense and changes in the amount or timing of the estimated cash flows.
(n)Stock-based compensation:
The Company recognizes employee stock-based compensation as an expense in the consolidated financial statements. Equity-classified awards are measured at the grant date fair value of the award. The fair value of stock options is determined using the Black-Scholes option valuation model using the grant date stock price, dividend yield, estimated amounts for volatility of the Company’s stock, the expected life of the awards and the risk-free interest rate. Compensation expense is recognized over the requisite service period for each separate tranche of the award. Forfeitures are accounted for as they occur.
The fair value of stock-settled restricted stock units (“RSU’s”) and deferred share units (“DSU’s”) is based on the Company’s stock price on the date of grant. Shares of common stock are issued at the vesting date for stock-settled RSU’s and DSU’s. The fair value of stock-settled RSU’s and DSU’s is amortized over the vesting period and recognized as an expense in the consolidated financial statements.
The fair value of performance share units ("PSU's") that have market performance conditions is determined using the Company’s stock price and a Monte-Carlo simulation model. The fair value of PSU’s is amortized over the vesting period and recognized as an expense in the consolidated financial statements.
(o)Income taxes:
Deferred tax assets and liabilities are recognized for the future tax consequences attributable to differences between the financial statement carrying amounts of existing assets and liabilities and their respective tax bases and operating loss and tax credit carryforwards. Deferred tax assets and liabilities are measured using enacted tax rates expected to apply to taxable income in the years in which those temporary differences are expected to be recovered or settled. The effect on deferred tax assets and liabilities of a change in tax rates is recognized in income in the period that includes the enactment date.
The Company recognizes the effect of uncertain income tax positions if those positions are more likely than not of being sustained. Recognized income tax positions are measured at the largest amount that is greater than 50% likely of being realized. Changes in recognition or measurement are reflected in the period in which the change in
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
judgment occurs. The Company records interest related to unrecognized tax benefits in interest expense and penalties, if any, in general and administrative expenses.
Each reporting period, the Company reviews its deferred tax assets for the possibility they will not be realized. A valuation allowance will be recorded if it is more likely than not that a deferred tax asset will not be realized.
(p)Fair value measurements:
The Company uses valuation approaches that maximize the use of observable inputs and minimize the use of unobservable inputs, to the extent possible. The Company determines fair value based on assumptions that market participants would use in pricing an asset or liability in the principal or most advantageous market. When considering market participant assumptions in fair value measurements, the following fair value hierarchy distinguishes between observable and unobservable inputs, which are categorized in one of the following levels (Note 22):
•Level 1: Unadjusted quoted prices in active markets for identical assets or liabilities accessible at the measurement date.
•Level 2: Quoted prices in markets that are not active, quoted prices for similar assets or liabilities in active markets, quoted prices or inputs that are observable, either directly or indirectly, for substantially the full term of the asset or liability, and model-based valuation techniques (e.g. the Black-Scholes model) for which all significant inputs are observable in the market or can be corroborated by observable market data for substantially the full term of the assets or liabilities.
•Level 3: Prices or valuation techniques that require inputs that are both significant to the fair value measurement and unobservable (supported by little or no market activity).
(q)Net loss per share:
Basic and diluted loss per share attributable to common stockholders are computed by dividing the net loss available to common stockholders by the weighted-average number of common shares outstanding for the respective period presented.
The diluted net loss per share attributable to common stockholders is computed by giving effect to all potential dilutive common stock equivalents outstanding for the period, except to the extent they are antidilutive.
(r)Convertible debt:
Upon the issuance of convertible debt, the Company evaluates embedded conversion features within convertible debt to determine whether the embedded conversion feature(s) should be bifurcated from the host instrument and accounted for as a derivative at fair value with changes in fair value recorded in the statement of consolidated and combined loss. If the conversion feature does not require derivative treatment, the instrument is evaluated for consideration of any beneficial conversion features or cash conversion features.
The Company may elect to account for the instrument at fair value with changes in fair value recorded in the statement of consolidated loss and comprehensive loss, except with respect to changes in value caused by changes in the Company’s own credit risk.
(s)Debt and equity issuance costs:
Debt issuance costs directly related to a debt liability, including fees, commissions and legal expenses, are deferred and presented as a direct reduction from the carrying amount of the debt and amortized on an effective interest rate method over the term of the liability. Amortization of debt issuance costs is included in interest expense in the Company’s consolidated statement of loss.
For debt where the Company has elected fair value accounting under ASC 825, debt issuance costs are expensed on recognition in the Company’s consolidated statement of net loss.
Costs directly attributable to the issuance of equity in the Company are netted against the gross proceeds of the equity.
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
3. Use of estimates:
The preparation of consolidated financial statements in conformity with U.S. GAAP requires management of the Company to make estimates and assumptions that affect the reported amounts of assets and liabilities, the related disclosure of contingent assets and liabilities, and the reported amounts of revenues and expenses. Actual results may differ from these estimates. The estimates and underlying assumptions are reviewed on an ongoing basis. Revisions to accounting estimates are recognized in the period in which the estimate is revised if the revision affects only that period, or in the period of the revision and future periods if the revision affects both current and future periods.
Significant areas requiring the use of estimates are as follows
(i)Recoverable value of exploration properties:
The Company reviews and evaluates exploration properties for impairment when events or changes in circumstances indicate that the carrying amount of an asset may not be recoverable. The recoverability of the Company’s exploration mineral interests did not involve significant estimation in the periods presented as circumstances did not indicate the carrying amount of our assets may not be recoverable. However, the recoverability of the Company’s recorded mineral interests is subject to market factors that could significantly affect the recoverability of the Company’s assets, such as commodity prices, results of exploration activities that may affect our intentions to continue under option or earn-in agreements and geopolitical circumstances. By nature, significant changes in these factors are reasonably possible to occur periodically, which could materially impact the Company’s consolidated financial statements.
(ii)Impairment indicators in equity securities:
The recoverability of the carrying value of the Company’s investments in private equity securities, including those subject to significant influence, is dependent on the Company’s ability to sell the assets privately or the investees’ ability to publicly list the shares or generate profitable operations and pay dividends in the future, in each case in amounts that exceed the carrying value. Changes in the investees’ plans and value or the Company’s expectations related to the manner and timing of realizing the value of its equity investments, may result in changes in the recoverability of recorded amounts.
(iii)Recoverability of deferred income tax assets:
The Company has recognized significant valuation allowances against its deferred tax assets. The necessity for valuation allowances could be affected by changes in the Company’s estimates of future taxable income. In addition to the generation of future taxable income through the establishment of economic feasibility, development and operation of mines on the Company’s exploration assets, opportunities for future taxable income could arise through disposal of assets, or the identification of tax-planning strategies or changes in tax laws that would allow the benefits of future deductible temporary differences in certain entities or jurisdictions to be offset against future taxable temporary differences in other entities or jurisdictions.
(iv)Valuation of stock options and PSU’s:
Determining the fair value of stock options and PSU’s require inputs that require management judgment. This includes expected volatility for stock options and PSU’s and expected life of stock options.
(v) Provision for expected credit loss:
Accounts receivable are reported net of an allowance for expected credit losses. The allowance is based on management’s estimate of lifetime expected credit losses, which considers historical loss experience, the aging of receivables, current economic conditions, reasonable and supportable forecasts, customer creditworthiness, payment history, and other relevant factors. Receivables that do not share similar risk characteristics are evaluated on an individual basis. In certain circumstances, management may determine that the collectability of a specific receivable is doubtful and record an allowance for the full amount outstanding. The determination of the allowance requires significant judgment and is inherently uncertain. Changes in customer financial condition, macroeconomic factors, or other circumstances could result in material adjustments to the allowance in future periods.
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
4. Recently adopted accounting standards and recent accounting pronouncements:
Income taxes:
The Company adopted ASU 2023-09 on January 1, 2025 and is required to disclose specific categories in the rate reconciliation if quantitative thresholds are met. The amount of income taxes paid, if any, is required to be disaggregated by federal, state and foreign taxes. The adoption of ASU 2023-09 did not have a material impact on the Company’s consolidated financial statements.
Recent accounting pronouncements not yet adopted
In November 2024, the FASB issued ASU 2024-03 Income Statement - Reporting Comprehensive Income - Expense Disaggregation Disclosures (Subtopic 220-40): Disaggregation of Income Statement Expenses. This update was issued to improve the disclosures about a public business entity’s expenses and address requests from investors for more detailed information about the types of expenses in commonly presented expense captions. The Company is required to adopt ASU 2024-03 on January 1, 2027 and is currently evaluating the expected impact on the consolidated financial statements.
5. Cash and cash equivalents:
Of the total cash and cash equivalents at December 31, 2025 and 2024, $9.1 million and $11.2 million, respectively, was not available for the general corporate purposes of the Company as it was held by non-wholly-owned subsidiaries (Note 18).
6. Restricted cash and deferred exploration liability:
On May 7, 2024, the Company entered into an Exploration Alliance Agreement ("the Alliance") with BHP Mineral Resources Inc. (“BHP”), which sets out the framework for BHP and the Company to explore mutually agreed areas of interest in the United States to identify copper and other critical metal exploration opportunities within those areas of interest that may become 50/50 owned joint ventures.
The agreement is for a term of three years, which may be extended upon mutual agreement. BHP will provide the initial funding of $15.0 million and thereafter the Company and BHP would provide funding on a 50/50 basis. The Company will provide the Alliance access to one Typhoon™ system.
As at December 31, 2025, BHP has provided total funding of $9.7 million, which is solely for funding exploration activities of the Alliance. The funding is recorded as restricted cash, with an offsetting credit recorded as a deferred exploration liability. The balances of restricted cash and deferred exploration liability decrease as exploration spend is incurred. During the year ended December 31, 2025 the Alliance spent $5.1 million on exploration activities (December 31, 2024 - $1.7 million).
The Company is using the equity method of accounting for the areas of interest as it was determined that they are subject to joint control.
7. Accounts and other receivables:
| | | | | | | | | | | |
| December 31, 2025 | | December 31, 2024 |
| Trade accounts receivable | $ | 14 | | | $ | 762 | |
| Other receivables (Note a) | 10,816 | | | 20,807 | |
| Provision for expected credit loss (Note a) | (10,304) | | | — | |
| $ | 526 | | | $ | 21,569 | |
(a) At December 31, 2024, other receivables included $20.0 million receivable from China Energy Storage Industry Co., Ltd. (“Red Sun”) by VRB in relation to the transaction described in Note 16, payable in two tranches. On February 11, 2025, VRB received the first tranche payment. The second tranche payment of $10.0 million was due on
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
June 30, 2025 and has not been received. At December 31, 2025, the Company recorded a provision for expected credit loss in the amount of the full second tranche payment due to prolonged delinquency, repeated unfulfilled payment promises from Red Sun, an absence of contractual modification and a high degree of risk and uncertainty with cross-border collection risk and contractual remedies. No expected credit loss was recorded during the year ended December 31, 2024.
8. Investments subject to significant influence:
The Company’s principal investments subject to significant influence are its investment in Maaden Ivanhoe Electric Exploration and Development Limited Company ("Maaden Joint Venture") and VRB Energy System (Beijing) Co., Ltd. (“VRB China”). Others include its investments in Sama Resources Inc. (“Sama”).
The Company has elected to carry its investments in common shares of the publicly-traded companies subject to significant influence at fair value.
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Equity Method | | Carried at fair value | |
| Maaden Joint Venture (Note a) | | VRB China (Note b) | | SNC (Note c) | | Other | | Sama (Note d) | | Total |
| Balance at December 31, 2023 | 31,606 | | | — | | | 896 | | | 2,469 | | | 4,159 | | | 39,130 | |
| Disposal of subsidiary | — | | | 35,761 | | | — | | | (623) | | | — | | | 35,138 | |
| Investment | — | | | — | | | 440 | | | 689 | | | — | | | 1,129 | |
| Share of (losses) income | (11,217) | | | 4,839 | | | (827) | | | (1,463) | | | — | | | (8,668) | |
| Acquisition | — | | | — | | | (489) | | | — | | | — | | | (489) | |
| Change in fair value | — | | | — | | | — | | | — | | | (1,030) | | | (1,030) | |
| Other | — | | | — | | | — | | | (177) | | | — | | | (177) | |
| Foreign currency translation | — | | | — | | | (20) | | | (126) | | | — | | | (146) | |
| Balance at December 31, 2024 | 20,389 | | | 40,600 | | | — | | | 769 | | | 3,129 | | | 64,887 | |
| Share of (losses) income | (12,162) | | | 6,592 | | | — | | | 20 | | | — | | | (5,550) | |
| Change in fair value | — | | | — | | | — | | | — | | | (940) | | | (940) | |
| Foreign currency translation | — | | | (36) | | | — | | | 38 | | | — | | | 2 | |
| Balance at December 31, 2025 | $ | 8,227 | | | $ | 47,156 | | | $ | — | | | $ | 827 | | | $ | 2,189 | | | $ | 58,399 | |
(a) Exploration Joint Venture with Maaden:
In 2023, Ivanhoe Electric entered into a 50/50 exploration joint venture with Maaden to explore approximately 50,000 km2 of prospective land in Saudi Arabia.
The Maaden Joint Venture is managed by the Board of Directors of the joint venture with Ivanhoe Electric and Maaden each having the right to appoint three directors and is subject to joint control.
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
Summarized financial information for the Maaden Joint Venture is as follows:
| | | | | | | | | | | |
| As at and for the year ended December 31 |
| 2025 | | 2024 |
| Current assets | $ | 14,762 | | | $ | 34,612 | |
| Non-current assets | 10,085 | | | 12,530 | |
| Current liabilities | 1,955 | | | 6,182 | |
| Non-current liabilities | 186 | | | 181 | |
| Equity | 22,706 | | | 40,779 | |
| Net loss | $ | 24,324 | | | $ | 22,434 | |
In January 2026, the Company provided funding to the Maaden Joint Venture in the amount of $6.3 million.
(b)VRB China:
On October 15, 2024, VRB entered into a transaction to reduce its ownership interest in VRB China from 100% to 49%, with the change in control becoming effective on October 31, 2024. As a result, VRB de-consolidated VRB China and began equity accounting for its retained interest. Refer to Note 16 for further information on the transaction.
The Company’s share of income from VRB China for the year ended December 31, 2025 includes:
•A $10.9 million gain (December 31, 2024 - $6.2 million) from the Company’s share of the increase in net asset value of VRB China as a result of capital increases of $22.5 million (December 31, 2024 - $12.7 million) from Red Sun ; offset by:
•$4.3 million share of loss (December 31, 2024 - $1.4 million) incurred by VRB China.
The Company recognizes its share of earnings from VRB China on a three month lag.
Summarized financial information for VRB China is as follows:
| | | | | | | | | | | |
| As at and for the nine months ended September 30, 2025 | | As at and for the two months ended December 31, 2024 |
| Current assets | $ | 34,866 | | | $ | 18,750 | |
| Non-current assets | 6,642 | | | 2,497 | |
| Current liabilities | 8,943 | | | 5,212 | |
| Non-current liabilities | 709 | | | 173 | |
| Equity | 31,856 | | | 15,862 | |
| Net loss | $ | 6,442 | | | $ | 2,776 | |
(c)Sama Nickel Corporation:
On March 11, 2024, the Company completed its earn-in and acquired an additional 30% in Sama Nickel Corporation (“SNC”) bringing its total ownership interest in SNC to 60%. SNC owns the Samapleu-Grata Nickel-Copper Project ("Samapleu Project") in the Ivory Coast. The Company determined that it acquired control of SNC and commenced consolidating the results of SNC from March 11, 2024 under the voting interest entity model. The acquisition was accounted for as an asset acquisition as SNC did not meet the definition of a business. The cost of the acquisition was allocated to the assets and liabilities of SNC, including its exploration property in the Ivory Coast.
(d) Sama:
Sama is a mineral exploration company, listed on the TSX Venture Exchange, focused on exploring nickel-copper projects in Ivory Coast, West Africa. As at December 31, 2025, the Company owned 22.7% (December 31, 2024 - 22.7%) of the issued and outstanding common shares in Sama.
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
9. Exploration properties:
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Santa Cruz (Note a) | | Tintic (Note b) | | Alacrán (Note c) | | Other | | Total |
| Balance at December 31, 2023 | 166,492 | | | 30,663 | | | 15,315 | | | 3,820 | | | 216,290 | |
| Acquisition costs | 10,300 | | | 40 | | | — | | | 529 | | | 10,869 | |
| De-recognition | — | | | — | | | — | | | (1,300) | | | (1,300) | |
| Foreign currency translation | — | | | — | | | — | | | 17 | | | 17 | |
| Balance at December 31, 2024 | 176,792 | | | 30,703 | | | 15,315 | | | 3,066 | | | 225,876 | |
| Acquisition costs | 731 | | | — | | | — | | | 375 | | | 1,106 | |
| De-recognition | — | | | — | | | — | | | (300) | | | (300) | |
| Impairment (Note d) | — | | | — | | | — | | | (2,537) | | | (2,537) | |
| Balance at December 31, 2025 | $ | 177,523 | | | $ | 30,703 | | | $ | 15,315 | | | $ | 604 | | | $ | 224,145 | |
(a)The Santa Cruz Copper Project is a copper project near the city of Casa Grande in Arizona, USA. Pursuant to an agreement entered into in 2021, the Company had an option agreement that provided the Company with the right to acquire 100% of the mineral title of the Santa Cruz Copper Project for consideration of $27.9 million. In August 2024, the Company completed the final $10.0 million payment to exercise its option to acquire 100% ownership of the mineral rights at the Santa Cruz Copper Project.
On December 12, 2025, Mesa Cobre Holding Corporation (“Mesa Cobre”), a wholly-owned subsidiary of the Company that owns the Santa Cruz Copper Project, closed a $200 million senior secured multi-draw bridge facility (the “Bridge Facility”) to support the development of the Santa Cruz Copper Project. The Bridge Facility has a two-year maturity term, with a single repayment at maturity. It will bear interest at the Company’s election, either at (i) the forward-looking term rate based on the Secured Overnight Financing Rate administered by the Federal Reserve Bank of New York plus a margin of 5.0%, increasing by 0.5% on each of the 6th, 12th, and 18th month following the closing date, or (ii) the alternate base rate as defined in the Bridge Facility agreements. As at December 31, 2025, the Bridge Facility was undrawn.
In connection with the Bridge Facility, (i) Mesa Cobre entered into a security agreement which granted a first priority lien on substantially all of its assets, subject to customary exceptions, (ii) Ivanhoe Electric guaranteed Mesa Cobre’s payment obligations pursuant to a guaranty agreement whereby Ivanhoe Electric agrees to maintain at all times a tangible net worth of not less than $225.0 million, (iii) Ivanhoe Electric pledged its shares of Mesa Cobre pursuant to a pledge agreement, and (iv) Mesa Cobre executed a deed of trust and assignment of rents with respect to Mesa Cobre’s real property rights.
Commitment fees on undrawn amounts will be incurred at a rate of 1.25% per annum until June 30, 2026, increasing by one eighth of a percent for every six month period thereafter.
Mesa Cobre incurred directly related debt issuance costs in the amount of $5.2 million. The debt issuance costs are recorded as other non-current assets and amortized over the life of the facility.
(b)The Tintic Project is a copper-gold-silver project in the Tintic District of Utah, USA. Pursuant to agreements entered into in 2017 and 2018, the Company obtained the right to explore the underlying assets and to acquire or optionally acquire specified mineral rights of the underlying assets by making scheduled payments.
The Company has completed its purchase of 100% of the assets included in the agreements.
(c)The Alacrán project is a copper-gold project in Colombia, held by Cordoba. On May 8, 2023, Cordoba closed a strategic arrangement with JCHX Mining Management Co., Ltd (“JCHX") to advance the Alacrán Project. Refer to Note 17 for further details regarding the strategic arrangement.
(d)During the year ended December 31, 2025, the Company impaired non-core exploration properties in the amount of $2.5 million.
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
10. Accounts payable and accrued liabilities:
| | | | | | | | | | | |
| December 31, 2025 | | December 31, 2024 |
| Trade accounts payable | $ | 7,792 | | | $ | 6,309 | |
| Accrued liabilities | 6,465 | | | 2,367 | |
| Due to related parties | 1,845 | | | 2,176 | |
| Other payables | 207 | | | 269 | |
| $ | 16,309 | | | $ | 11,121 | |
11. Note payable:
| | | | | |
| Note payable |
| Balance at December 31, 2023 | $ | 48,916 | |
| Finance expense | 4,429 | |
| Payment | (16,773) | |
| Balance at December 31, 2024 | $ | 36,572 | |
| Finance expense | 2,701 | |
| Payment | (39,273) | |
| Balance at December 31, 2025 | $ | — | |
In connection with the purchase of land at its Santa Cruz Copper Project in 2022, the Company issued a secured promissory note. The promissory note was paid off in full in November 2025.
12. Convertible debt:
| | | | | |
| VRB Convertible bond
|
| Balance at December 31, 2023 | $ | 28,372 | |
| Finance expense | 2,570 | |
| Balance at December 31, 2024 | 30,942 | |
| Finance expense | 2,796 | |
| Balance at December 31, 2025 | $ | 33,738 | |
On July 8, 2021, VRB issued a convertible bond for gross proceeds of $24.0 million. The bond has a five-year term and interest accrues at a rate of 8% per annum.
Prior to the maturity date of July 8, 2026, the convertible bond is automatically converted into equity of VRB upon an equity financing or sale event, at a price per share equal to the lower of:
•the transaction price of the equity financing or sale event; and
•the valuation cap price of $158.0 million divided by the total shares outstanding at the time of the event.
If no equity financing or sale event occurs, VRB must repay the outstanding principal and interest on maturity.
The Company has accounted for the convertible bond as a debt instrument accounted at amortized cost, as it was determined the embedded features are not required to be bifurcated.
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
13. Equity:
(a)Common stock transactions:
At December 31, 2025, the Company is authorized to issue 700,000,000 shares of common stock, at $0.0001 par value.
(i) 2025 public offerings:
On February 14, 2025, Ivanhoe Electric completed a public offering where it issued 11,794,872 units (the “Units”) at a price of $5.85 per Unit for gross proceeds of $69.0 million. Each Unit consists of (i) one share of Ivanhoe Electric’s common stock and (ii) one accompanying warrant (the "Warrants"). Each whole Warrant is exercisable to purchase one share of Ivanhoe Electric’s common stock at a price of $7.00 per share, exercisable for a period of one year. Directly attributable issuance costs of $3.1 million incurred in conjunction with the public offering were recorded as a reduction in paid in capital.
During 2025, 150,000 warrants were exercised for gross proceeds of $1.1 million. In January and February 2026, 11.6 million warrants were exercised for gross proceeds of $81.5 million.
On October 23, 2025, Ivanhoe Electric completed a public offering and issued 10.0 million shares of common stock at a price of $15.00 per share for gross proceeds of $150 million. On October 27, 2025, pursuant to the exercise in full of the underwriters option, Ivanhoe Electric issued an additional 1.5 million shares of common stock for gross proceeds of $22.5 million, increasing the total gross proceeds to $172.5 million. Directly attributable issuance costs of $7.2 million incurred in conjunction with the public offering were recorded as a reduction in paid in capital.
(ii) Kaizen arrangement:
On February 6, 2024, Ivanhoe Electric acquired all of the issued and outstanding common shares of Kaizen Discovery Inc. (“Kaizen”) not already beneficially owned by Ivanhoe Electric pursuant to a plan of arrangement under the Business Corporations Act (British Columbia) (the “Arrangement”).
Immediately prior to the closing of the Arrangement, Ivanhoe Electric beneficially owned 82.5% of the issued and outstanding common shares of Kaizen on a non-diluted basis. Following the closing of the Arrangement, Ivanhoe Electric beneficially owns 100% of the issued and outstanding common shares of Kaizen on a fully diluted basis.
Ivanhoe Electric acquired the common shares in consideration for the issuance of one share of common stock of Ivanhoe Electric for every 127 Common Shares issued and outstanding immediately prior to the closing of the Arrangement. A total of 116,413 shares of Ivanhoe Electric were issued.
(iii) Maaden Strategic Investment:
On July 6, 2023 Ivanhoe Electric completed the closing of the Maaden transactions which included the issuance of 10.3 million shares of common stock, representing 9.9% of common shares on completion of the Maaden transactions, at a purchase price of $12.38 per share for gross proceeds of $127.1 million. Directly attributable issuance costs of $3.5 million incurred in conjunction with the strategic investment were recorded as a reduction in paid in capital.
Ivanhoe Electric granted Maaden a top-up right allowing Maaden to maintain its 9.9% ownership for up to eight years through the purchase of additional shares at a price per share paid in a recent equity financing. Maaden has agreed to a five-year standstill limiting its shareholding to a maximum of 19.9%, subject to certain exceptions. Maaden was granted the right to appoint a nominee to the Ivanhoe Electric board of directors.
(iii) Public offering and subscription agreement:
On September 18, 2023, Ivanhoe Electric completed a public offering and issued 13.6 million shares of common stock at a price of $13.50 per share for gross proceeds of $184.0 million. Directly attributable
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
issuance costs of $8.5 million incurred in conjunction with the public offering were recorded as a reduction in paid in capital.
On October 23, 2023 Maaden signed a subscription agreement, exercising their right to maintain 9.9% ownership in the Company following the public offering. The Company issued 1.5 million shares of common stock to Maaden at a price of $13.50 per share for gross proceeds of $20.4 million.
(b)Stock-based compensation:
A portion of total stock-based compensation is incurred by non-wholly-owned subsidiaries, as follows:
| | | | | | | | | | | | | | | | | |
| Year ended December 31, |
| 2025 | | 2024 | | 2023 |
| Ivanhoe Electric | $ | 11,269 | | | $ | 13,866 | | | $ | 20,028 | |
| Non-wholly-owned subsidiaries | 388 | | | 1,098 | | | 935 | |
| $ | 11,657 | | | $ | 14,964 | | | $ | 20,963 | |
Option exercises at the subsidiary level, should they occur, will impact the Company’s non-controlling interest in the applicable subsidiary, not the Company’s share capital.
Stock-based payment compensation was allocated to operations as follows:
| | | | | | | | | | | | | | | | | |
| Year ended December 31, |
| Stock-based payment compensation in: | 2025 | | 2024 | | 2023 |
| General and administrative expenses | $ | 9,818 | | | $ | 11,923 | | | $ | 17,670 | |
| Exploration expenses | 1,839 | | | 3,041 | | | 3,277 | |
| Research and development expenses | — | | | — | | | 11 | |
| Cost of sales | — | | | — | | | 5 | |
| $ | 11,657 | | | $ | 14,964 | | | $ | 20,963 | |
The Company’s Long Term Incentive Plan (“LTIP”) provides for grants of stock options, stock awards, stock unit awards, and deferred stock unit awards. The Company’s employees, including employees who are directors, consultants and non-employee directors are eligible to receive awards under the LTIP. Stock options may not be granted with an exercise price less than the closing price of the Company’s common stock on the grant date. As of December 31, 2025, 14,757,072 shares were available for grant under the LTIP and no shares were available under other plans.
(i) Stock options:
A summary of stock options outstanding and activity is presented below.
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
| | | | | | | | | | | | | | | | | | | | | | | |
| Number of options | | Weighted- Average Exercise Price | | Weighted- Average Remaining Contractual Term (years) | | Aggregate Intrinsic Value |
| Outstanding at January 1, 2023 | 7,071,164 | | $ | 6.11 | | | | | |
| Granted | 950,000 | | 13.96 | | | | | |
| Exercised | (1,379,526) | | 2.49 | | | | | |
| Forfeited/expired | (442,701) | | 6.13 | | | | | |
| Outstanding at December 31, 2023 | 6,198,937 | | | 8.11 | | | 4.5 | | $ | 20,207 | |
| Granted | 2,216,404 | | 13.50 | | | | | |
| Exercised | (151,485) | | 5.72 | | | | | |
| Forfeited/expired | (188,429) | | 8.77 | | | | | |
| Outstanding at December 31, 2024 | 8,075,427 | | | 9.62 | | | 2.6 | | $ | 12,614 | |
| Exercised | (1,131,331) | | 4.96 | | | | | |
| Forfeited/expired | (264,890) | | 12.61 | | | | | |
| Outstanding at December 31, 2025 | 6,679,206 | | $ | 10.38 | | | 3.5 | | $ | 39,884 | |
| | | | | | | |
| Vested and exercisable at December 31, 2023 | 2,766,116 | | $ | 5.51 | | | 3.6 | | $ | 14,151 | |
| Vested and exercisable at December 31, 2024 | 4,461,184 | | $ | 6.73 | | | 3.0 | | $ | 12,614 | |
| Vested and exercisable at December 31, 2025 | 5,034,006 | | $ | 9.33 | | | 3.0 | | $ | 33,451 | |
The fair value of each stock option is estimated on the date of grant using the Black-Scholes option valuation model. Expected volatility was calculated based on the historical volatility of a group of peer companies’ common stock and a group of relevant stock market indices over the expected option life. Management exercised judgment in determining the expected life of the options and considered factors such as the contractual term of the options, the vesting schedule and expected volatility. The risk-free interest rate is based on Federal Reserve rates in effect for bonds with maturity dates equal to the expected term of the option.
No stock options were granted in 2025. Information related to stock options granted during the years ended December 31, 2024 and 2023 is presented below.
| | | | | | | | | | | |
| | 2024 | 2023 |
| Weighted average assumptions used to value stock option awards: | | |
| Fair value of common stock | $ | 9.20 | | $ | 13.94 | |
| Expected volatility | 61.4 | % | 68.2 | % |
| Expected life of options (in years) | 4.0 | 4.0 |
| Expected dividend rate | 0 | % | 0 | % |
| Risk-free interest rate | 4.29 | % | 4.04 | % |
| Weighted average grant-date fair value (per option) | $ | 3.70 | | $ | 7.53 | |
For the year ended December 31, 2025, the Company recognized $5.2 million in stock-based compensation expense relating to the vesting stock options.
At December 31, 2025, the Company had $1.7 million of total unrecognized compensation cost to be recognized in 2026 and 2027 in relation to stock options.
(ii) Stock-settled RSU’s:
On January 1, 2023, Ivanhoe Electric granted 750,000 stock-settled RSUs to an executive of the Company. The RSUs comprise five equal tranches vesting in one-fifth annual increments beginning one year from the
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
grant date. The fair value of the stock-settled RSUs is amortized over the vesting period. The total fair value of the January 1, 2023 RSU grant was $9.1 million.
On March 6, 2025, the Company granted 776,557 stock settled RSU's to certain officers and employees of the Company. The RSU’s vest in three equal tranches beginning one year from the grant date. The fair value of the stock-settled RSU’s is amortized over the vesting period. The total grant date fair value of these RSU's was $4.5 million based on a grant date share price of $5.84 per share.
A summary of outstanding stock-settled RSU’s as of December 31, 2025 and activity during the year then ended is presented below.
| | | | | | | | | | | | | | | | | |
| Number of awards | | Weighted-Average Grant Date Fair Value Per Award | | Aggregate Intrinsic Value |
| Outstanding at January 1, 2023 | 750,000 | | $ | — | | | |
| Granted | 750,000 | | 12.15 | | | |
| Vested | (250,000) | | 9.98 | | | |
| Outstanding at December 31, 2023 | 1,250,000 | | | 9.98 | | | $ | 12,600,000 | |
| Vested | (304,213) | | 11.05 | | | |
| Cancelled | (95,787) | | 9.98 | | | |
| Outstanding at December 31, 2024 | 850,000 | | | 11.51 | | | $ | 6,417,500 | |
| Granted | 776,557 | | 5.84 | | | |
| Vested | (302,165) | | 11.06 | | | |
| Cancelled | (142,697) | | 8.68 | | | |
| Outstanding at December 31, 2025 | 1,181,695 | | | $ | 8.46 | | | $ | 18,883,486 | |
For the year ended December 31, 2025, the Company recognized $4.4 million in stock-based compensation expense relating to the vesting of RSU’s.
At December 31, 2025, the Company had $3.3 million of total unrecognized compensation cost to be recognized in 2026 through 2028 in relation to stock-settled RSU’s.
(iii) PSU’s:
On March 6, 2025, the Company granted PSU's to certain officers and employees of the Company. The PSU's vest on December 31, 2027, with the number of units to vest determined by Ivanhoe Electric’s share price performance against constituents from a Base Metals Index. The number of units to vest ranges between zero times to two times the target number of PSU's. The total target number of PSU's is 714,822, which is one times the target. The grant date fair value of these PSU's was $5.1 million.
Monte Carlo valuation methodology was used to determine the fair value of the PSU's, which required the input of the following assumptions.
| | | | | |
| Grant date: March 6, 2025 |
| Expected volatility | 63.4 | % |
| Expected life of PSU's (in years) | 2.8 |
| USA risk-free interest rate | 4.0 | % |
| Canada risk-free interest rate | 2.6 | % |
| Expected dividend rate | 0 | % |
| Weighted average grant-date fair value (per unit) | $ | 7.07 | |
Expected volatility is based on the historical volatility of the Company's share price over a term commensurate with the remaining life of the PSU's. The USA risk-free interest rate was based on the yield
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
observed on the US Dollar treasury curve as at the grant date, while the Canadian risk-free rate was based on the yield observed on the Canadian dollar government bond curve as at the grant date.
For the year ended December 31, 2025, the Company recognized $1.4 million in stock-based compensation expense relating to the vesting of PSU’s.
At December 31, 2025, the Company had $3.4 million of total unrecognized compensation cost to be recognized in 2026 and 2027 in relation to PSU’s.
14. Revenue:
The Company recognized revenue from the following sources:
| | | | | | | | | | | | | | | | | | | | |
| | Year ended December 31, |
| Revenue type | | 2025 | | 2024 | | 2023 |
| Data processing services | | $ | 3,244 | | | $ | 2,831 | | | $ | 1,300 | |
| Energy storage systems | | — | | | 70 | | | 2,603 | |
| Total | | $ | 3,244 | | | $ | 2,901 | | | $ | 3,903 | |
15. Exploration expense:
| | | | | | | | | | | | | | | | | | | | |
| | Year ended December 31, |
| Project | | 2025 | | 2024 | | 2023 |
| Santa Cruz, USA (Note 9(a)) | | $ | 23,589 | | | $ | 72,384 | | | $ | 57,203 | |
| Alacran, Colombia (Cordoba) (Note 9(c)) | | 19,397 | | | 14,756 | | | 28,068 | |
| Gleeson, USA | | 2,099 | | | — | | | — | |
| Tintic, USA (Note 9(b)) | | 2,075 | | | 11,274 | | | 13,131 | |
| Hog Heaven, USA (Note a) | | 1,911 | | | 10,855 | | | 7,812 | |
| Project Generation and other | | 14,216 | | | 21,675 | | | 20,505 | |
| Total | | $ | 63,287 | | | $ | 130,944 | | | $ | 126,719 | |
(a)The Company has an earn-in agreement whereby it must incur $15.0 million in earn-in expenditures (completed) and make payments to the counterparty totaling $4.5 million ($2.5 million paid as of December 31, 2025 ), the last of which is due in 2027, to earn an initial 51% interest in the Hog Heaven Project. The Company can earn an additional 24% in the project, for a total of 75%, if it completes an additional $25.0 million in expenditures by February 26, 2032. As at December 31, 2025 the Company has incurred cumulative expenditures of $22.7 million in relation to its earn-in at the Hog Heaven Project.
16. Disposal of subsidiary:
On October 15, 2024, VRB entered into an agreement with Red Sun to form a joint venture in VRB's existing operation in China. Under this agreement, Red Sun holds a 51% ownership stake in VRB China and VRB owns the remaining 49%. The change in control became effective on October 31, 2024.
Red Sun purchased shares of VRB China, a previously wholly-owned subsidiary of VRB, from VRB for $20.0 million and was required to make a capital increase directly in VRB China in the amount of $35.2 million, of which $12.7 million was received in 2024 and $22.5 million in 2025.
The $20.0 million due to VRB is payable in two tranches. On February 11, 2025, VRB received the first tranche payment. The second tranche payment of $10.0 million was due on June 30, 2025 and has not been received. Management continues to pursue recovery of the outstanding receivable through ongoing discussions with Red Sun.
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
The receivable is supported by collateral in the form of equity; however, as of the reporting date, management has not initiated enforcement or execution of the collateral.
VRB China is a variable interest entity, as it is dependent on additional subordinated financial support from Red Sun, principally in the form of additional committed capital contributions. The Company has determined it is no longer the primary beneficiary of VRB China as of October 31, 2024.
As a result, the Company has de-consolidated VRB China as of October 31, 2024 and has accounted for its retained interest in VRB China using the equity method of accounting. The Company recorded its retained interest in VRB China at a fair value of $35.8 million, based on the consideration paid, and recognized a gain on the sale of the controlling interest of VRB China of $50.7 million, as presented below.
| | | | | |
| October 31, 2024 |
| Fair value of retained interest | $ | 35,761 | |
| Consideration received for sale of shares | 20,000 | |
| Net assets disposed of on de-consolidation | (5,567) | |
| Accumulated other comprehensive income disposed of on de-consolidation | 491 | |
| Gain on disposal of subsidiary | $ | 50,685 | |
As at December 31, 2025, the Company’s maximum exposure to loss in VRB China is represented by the aggregate carrying value of $47.2 million for its retained interest in the equity of VRB China.
17. Non-controlling interests investment in subsidiary:
On May 8, 2023, Cordoba closed the $100.0 million strategic arrangement with JCHX to advance the Alacrán Project in Colombia. Upon closing, JCHX received a 50% ownership interest in CMH Colombia S.A.S. (“CMH”), a Colombian company that owns 100% of the Alacrán Project and is the joint venture vehicle for Cordoba and JCHX in this strategic project level partnership.
For its 50% interest, JCHX will pay the $100.0 million purchase price in three installments. As of the closing of the transaction, $40.0 million was paid as a first installment. On January 4, 2024, Cordoba received the second installment of $40.0 million. The final installment of $20.0 million was received in June 2025.
The Company currently retains control over the relevant activities of CMH and therefore continues to consolidate the entity.
The Company measures its non-controlling interest and loss attributable to non-controlling shareholders on the basis of a hypothetical liquidation at book value. Upon closing in 2023, the Company recorded the difference between the consideration received and the carrying value of the interest given up of $18.0 million in additional paid in capital.
On May 8, 2025, Cordoba entered into an agreement with JCHX and a consortium of investors to sell Cordoba's remaining 50% interest in the Alacrán Copper Project, for $88.0 million in cash on closing, $12.0 million in a deferred payment, and up to $28.0 million in a contingent payment depending on the copper price at the time of commercial production. The closing of the transaction was contingent upon the approval of the Environmental Impact Assessment (“EIA”), which remains pending from the relevant Colombian Government authority as of the outside date of December 31, 2025. This provided either party the right to exit the agreement.
On February 10, 2026, the agreement was amended to provide for the full $128.0 million purchase price to be paid at closing and remove any post-closing payments, waive the closing condition of an EIA , add a new closing condition of JCHX shareholder approval, and extend the outside date to March 10, 2026. Cordoba has also agreed to use commercially reasonable efforts to distribute to its shareholders the net proceeds after satisfying all liabilities and obligations, subject to required approvals, such that $10.0 million will remain in Cordoba.
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
18. Non-controlling interests:
The Company held a controlling interest in several entities that are not wholly-owned. The associated non-controlling interests and portion of assets and liabilities represented by these subsidiaries are shown below. The assets and liabilities of these entities are not readily accessible by the Company for general corporate purposes as distribution may require the consent of other shareholders.
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Kaizen | | VRB | | Cordoba | | CGI | | SNC | | Total |
| Balance at December 31, 2023 | $ | 316 | | | $ | (3,783) | | | $ | 5,366 | | | $ | 132 | | | $ | — | | | $ | 2,031 | |
| Non-controlling interests share of income (loss) | — | | | 4,249 | | | (15,473) | | | (44) | | | (380) | | | (11,648) | |
| Changes in non-controlling interests arising from changes in ownership interest | (316) | | | — | | | 20,628 | | | — | | | 364 | | | 20,676 | |
| Other changes in non-controlling interests | — | | | (42) | | | 530 | | | (9) | | | 252 | | | 731 | |
| Balance at December 31, 2024 | — | | | 424 | | | 11,051 | | | 79 | | | 236 | | | 11,790 | |
| Non-controlling interests share of (loss) income | — | | | (1,210) | | | (17,650) | | | 68 | | | (381) | | | (19,173) | |
| Changes in non-controlling interests arising from changes in ownership interest | — | | | — | | | 13,721 | | | — | | | 399 | | | 14,120 | |
| Other changes in non-controlling interests | — | | | 3 | | | 700 | | | 6 | | | 10 | | | 719 | |
| Balance at December 31, 2025 | $ | — | | | $ | (783) | | | $ | 7,822 | | | $ | 153 | | | $ | 264 | | | $ | 7,456 | |
Assets and liabilities belonging to the Company’s principal non-wholly owned subsidiaries as of December 31, 2025 are as follows:
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| VRB | | Cordoba | | CGI | | SNC | | Total |
| Ownership percentage at December 31, 2025: | 90.0 | % | | 60.8 | % | | 94.3 | % | | 60.0 | % | | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Total assets | $ | 52,882 | | | $ | 18,686 | | | $ | 2,856 | | | $ | 983 | | | $ | 75,407 | |
| Total liabilities | 60,728 | | | 5,544 | | | 166 | | | 322 | | | 66,760 | |
| Net assets | $ | (7,846) | | | $ | 13,142 | | | $ | 2,690 | | | $ | 661 | | | $ | 8,647 | |
VRB’s liabilities as at December 31, 2025 include a loan payable to Ivanhoe Electric of $26.9 million.
Each of the non-wholly owned subsidiaries do not have retained earnings as they carry an accumulated deficit. Net assets of non-wholly owned subsidiaries are restricted from being transferred to Ivanhoe Electric without the other shareholders’ consent.
The Company and its wholly-owned subsidiaries do not guarantee the obligations of the non-wholly owned subsidiaries and, as such, the creditors of the non-wholly owned subsidiaries do not have recourse against the Company or its wholly owned subsidiaries. In addition, the Company may be restricted from paying dividends from non-wholly owned subsidiaries without the other shareholders’ consent.
During 2021, VRB raised capital through the issuance of convertible debt (Note 12) resulting in VRB becoming a VIE. Except as disclosed above, the Company has not provided additional subordinated financial support to VRB as at December 31, 2025, although the Company is not precluded from doing so in the future. Ivanhoe Electric does not provide any guarantees or have any commitments to fund VRB. Other creditors of VRB do not have recourse against Ivanhoe Electric. Further information about VRB, including its impact on the Company’s loss from operations, is presented as the Energy Storage segment in Note 24.
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
19. Income taxes:
Total income tax provision / (benefit) for the years ended December 31, 2025, 2024 and 2023 are allocated as follows:
| | | | | | | | | | | | | | | | | |
| Year ended December 31, |
| 2025 | | 2024 | | 2023 |
| Income from continuing operations | $ | 12 | | | $ | 32 | | | $ | (584) | |
| Equity, non-controlling interests investment in subsidiary | — | | | — | | | 2,846 | |
| Total income tax provision / (benefit) | $ | 12 | | | $ | 32 | | | $ | 2,262 | |
Major components of the Company’s income tax provision / (benefit) from continuing operations for the years ended December 31, 2025, 2024 and 2023 are as follows:
| | | | | | | | | | | | | | | | | |
| Year ended December 31, |
| 2025 | | 2024 | | 2023 |
| Current: | | | | | |
| U.S. Operations | $ | — | | | $ | — | | | $ | — | |
| Foreign | 12 | | | 32 | | | (380) | |
| Total current income tax provision / (benefit) | 12 | | | 32 | | | (380) | |
| Deferred: | | | | | |
| U.S. Operations | — | | | — | | | — | |
| Foreign | — | | | — | | | (204) | |
| Total deferred income tax provision / (benefit) | — | | | — | | | (204) | |
| Total income tax provision / (benefit) | $ | 12 | | | $ | 32 | | | $ | (584) | |
Loss from continuing operations before income taxes for the years ended December 31, 2025, 2024 and 2023 consists of the following:
| | | | | | | | | | | | | | | | | |
| Year ended December 31, |
| 2025 | | 2024 | | 2023 |
| U.S. Operations | $ | (73,332) | | | $ | (136,615) | | | $ | (124,083) | |
| Foreign | (51,704) | | | (3,622) | | | (92,576) | |
| Total | $ | (125,035) | | | $ | (140,238) | | | $ | (216,659) | |
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
The annual income tax expense (benefit) attributable to income from continuing operations is different from the amount that would be provided by applying the statutory federal income tax rate to the Company’s pretax (loss) income. The reasons for the difference are:
| | | | | | | | | | | | | | | | | | | | | | | | | | |
| Year ended December 31, |
| 2025 | | 2024 | | 2023 |
| Amount | % | | Amount | % | | Amount | % |
| Expected income tax (benefit) expense at U.S. Federal tax rate | $ | (26,258) | | 21 | % | | $ | (29,450) | | 21 | % | | $ | (45,498) | | 21 | % |
| Reconciling items: | | | | | | | | |
| Domestic Tax | | | | | | | | |
| Permanent differences | 3,440 | | (3) | | | 3,964 | | (3) | | | 4,457 | | (2) | |
| Change in valuation allowance | 12,568 | | (10) | | | 24,700 | | (18) | | | 21,587 | | (10) | |
| Other | (608) | | 1 | | | 25 | | — | | | 13 | | — | |
| Foreign Tax | | | | | | | | |
| Difference between statutory and foreign tax rate | (1,156) | | 1 | | | (11,353) | | 8 | | | (3,513) | | 2 | |
| Change in valuation allowance | 10,633 | | (9) | | | 8,079 | | (6) | | | 21,262 | | (10) | |
| Other | 1,393 | | (1) | | | 4,067 | | (3) | | | 1,108 | | (1) | |
| Income tax expense (benefit) | $ | 12 | | — | % | | $ | 32 | | — | % | | $ | (584) | | — | % |
The tax effects of temporary differences that give rise to significant portions of the deferred tax assets and deferred tax liabilities at December 31, 2025 and 2024 are presented below.
| | | | | | | | | | | |
| As at December 31, |
| 2025 | | 2024 |
| Deferred tax assets: | | | |
| Exploration mineral interest | $ | 56,783 | | | $ | 46,481 | |
| Net operating losses | 90,306 | | | 73,205 | |
| Equity method investment in joint venture | 14,936 | | | 12,552 | |
| Foreign capital losses | 5,471 | | | 5,485 | |
| Capital loss carry-forward | 1,618 | | | 1,555 | |
| Other | 1,663 | | | 1,249 | |
| Total gross deferred tax assets | 170,777 | | | 140,527 | |
| Less: valuation allowance | (169,919) | | | (139,953) | |
| Net deferred tax assets | 858 | | | 574 | |
| Deferred tax liabilities: | | | |
| Exploration mineral interest | (4,751) | | | (4,049) | |
| Other | (858) | | | (574) | |
| Total gross deferred tax liabilities | (5,609) | | | (4,623) | |
| Net deferred tax liability | $ | (4,751) | | | $ | (4,049) | |
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
The Company evaluated the positive and negative evidence available to determine the amount of valuation allowance required on its deferred tax assets. The Company has recognized a valuation allowance against deferred income tax assets in excess of those supported by the reversal of taxable temporary differences. As of December 31, 2025, a $169.9 million valuation allowance has been provided. The changes in the valuation allowance for the years ended December 31, 2025 and 2024 are as follows:
| | | | | | | | | | | |
| As at December 31, |
| 2025 | | 2024 |
| Balance, beginning of year | $ | (139,953) | | | $ | (117,154) | |
| (Increase) decrease due to foreign currency translation | (6,764) | | | 5,361 | |
| Increase related to non-utilization of deferred tax assets due to uncertainty of recovery and increase related to non-utilization of net operating loss carryforwards | (23,201) | | | (36,063) | |
| (Increase) decrease related to utilization and expiration of deferred tax assets, other | (2) | | | 7,903 | |
| Balance, end of year | $ | (169,919) | | | $ | (139,953) | |
As of December 31, 2025, the Company has the following net operating loss carryforwards for income tax purposes:
| | | | | | | | | | | | | | |
| Country | | Losses | | Expiry |
| United States | | $ | 344,354 | | | 2036 to 2045 |
| Canada | | 46,998 | | | 2028 to 2045 |
| Colombia | | 13,160 | | | 2029 to 2036 |
| Singapore | | 4,709 | | | Indefinite |
The Company’s utilization of U.S. net operating loss carryforwards may be subject to annual limitations if there is a change in control as defined under Internal Revenue Code Section 382. As of December 31, 2025, no change in control has occurred in the Ivanhoe Electric group.
The Company files income tax returns in the U.S. federal jurisdiction and various U.S. state and foreign jurisdictions.
The Company had no unrecognized income tax benefits as of December 31, 2025 or 2024. Due to the net operating loss carryover position coupled with the lack of any unrecognized tax benefits, the Company has not provided for any interest or penalties associated with any uncertain tax positions. If interest and penalties were to be assessed, the Company would charge interest to interest expense, and penalties to general and administrative expense. It is not anticipated that there will be any significant changes to unrecognized tax benefits within the next 12 months.
The Company has not recognized a deferred tax liability related to its investments in foreign subsidiaries that are essentially permanent in duration. It is not practicable to estimate the amount of deferred tax liability related to investments in these foreign subsidiaries.
20. Related party transactions:
Related parties include entities with common direct or indirect shareholders and/or directors. Parties are considered to be related if one party has the ability, directly or indirectly, to control the other party or exercise significant influence over the other party in making financial and operating decisions.
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
The following table summarizes transactions between the Company and certain significant related parties.
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Balance outstanding as at December 31, | | Transactions for the year ended December 31, |
| 2025 | | 2024 | | 2025 | | 2024 | | 2023 |
| Total Expenses | | | | | | | | | |
| Global Mining (Note a) | $ | 649 | | | $ | 643 | | | $ | 2,729 | | | $ | 4,325 | | | $ | 13,471 | |
| Ivanhoe Capital Aviation (Note b) | — | | | 83 | | | 750 | | | 1,000 | | | 1,000 | |
| High Water Holding Company (Note b) | 250 | | | — | | | 250 | | | — | | | — | |
| I-Pulse (Note c) | — | | | — | | | — | | | 1,379 | | | 3,107 | |
| JCHX Mining Management Co., Ltd (Note d) | 1,500 | | | 1,500 | | | — | | | 1,580 | | | — | |
| Total | $ | 2,399 | | | $ | 2,226 | | | $ | 3,729 | | | $ | 8,284 | | | $ | 17,578 | |
| Revenue and accounts receivable | | | | | | | | | |
| Maaden Joint Venture (Note 8(a)) | $ | — | | | $ | 300 | | | $ | 2,409 | | | $ | 1,463 | | | $ | — | |
| Advances | | | | | | | | | |
| Global Mining (Note a) | 422 | | | 831 | | | — | | | — | | | — | |
| Maaden Joint Venture (Note 8(a)) | 141 | | | 176 | | | — | | | — | | | — | |
| Deposit | | | | | | | | | |
| I-Pulse (Note c) | 1,573 | | | 2,593 | | | — | | | — | | | — | |
| Loan | | | | | | | | | |
| JCHX Mining Management Co., Ltd (Note d) | $ | — | | | $ | 5,001 | | | $ | — | | | $ | — | | | $ | — | |
| | | | | | | | | | | | | | | | | |
| Transactions for the year ended December 31, |
| 2025 | | 2024 | | 2023 |
| Expense classification | | | | | |
| General and administrative expenses | $ | 3,319 | | | $ | 4,339 | | | $ | 7,469 | |
| Exploration expenses | 410 | | | 3,010 | | | 8,231 | |
| Research and development expenses | — | | | 935 | | | 1,878 | |
| $ | 3,729 | | | $ | 8,284 | | | $ | 17,578 | |
(a)Global Mining Management Corp. (“Global Mining”) is a private company based in Vancouver, Canada, that provided administration, accounting, and other office services to the Company on a cost-recovery basis. Effective October 31, 2025, the Company ended its service relationship with Global Mining and is no longer a shareholder.
(b)Ivanhoe Capital Aviation (“ICA”) and High Water Holding Company (“High Water”) are entities beneficially owned by the Company’s Executive Chairman. ICA and High Water provided use of an aircraft to the Company during 2025.
(c)The Company's Executive Chairman is the Chief Executive Officer and a principal owner of I-Pulse. On October 24, 2022, the Company entered into an agreement with I-Pulse, to purchase six Typhoon™ transmitters. The total purchase price for the six Typhoon™ transmitters is $12.4 million. In October 2022, the Company made deposit payments totaling $7.1 million, representing 50% of each component of the agreement. The remaining payments will be made as each Typhoon™ transmitter system is delivered. As at December 31, 2025, the Company has received four of the Typhoon™ transmitters that are deliverable under the agreement.
(d)JCHX held 19.2% of Cordoba’s issued and outstanding common stock as at December 31, 2025 (December 31, 2024 - 19.7%).
In December 2024, Cordoba obtained a $10.0 million bridge loan from JCHX, of which $5.0 million was received in December 2024 and $5.0 million in January 2025. In June 2025, JCHX completed the third and final
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
installment of $20.0 million in relation to its acquisition of a 50% interest in the Alacran Project. In June 2025, the bridge loan was repaid in full using the proceeds from the third installment.
21. Net loss per share:
Basic and diluted net loss per share attributable to common stockholders was calculated as follows:
| | | | | | | | | | | | | | | | | |
| Year ended December 31, |
| 2025 | | 2024 | | 2023 |
| Net loss attributable to common stockholders or parent | $ | 105,874 | | | $ | 128,622 | | | $ | 199,377 | |
| Weighted-average number of shares outstanding | | | | | |
| Basic and diluted | 133,583,203 | | 120,377,904 | | 102,491,529 |
| Basic and diluted net loss per share | $ | 0.79 | | | $ | 1.07 | | | $ | 1.95 | |
For purposes of this calculation, convertible debt, and options to purchase common stock are considered common stock equivalents but have been excluded from the calculation of diluted net loss per share attributable to common stockholders as their effect is antidilutive. The amount of antidilutive shares excluded from the calculation as at December 31, 2025 was 20.3 million (December 31, 2024 - 9.0 million, December 31, 2023 - 7.5 million).
22. Fair value measurement:
The following table provides the valuation hierarchy classification of assets and liabilities that are recorded at fair value and measured on a recurring basis in the combined balance sheets:
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| December 31, 2025 | | December 31, 2024 |
| Level 1 | | Level 2 | | Level 3 | | Level 1 | | Level 2 | | Level 3 |
| Financial assets: | | | | | | | | | | | |
| Investments subject to significant influence | $ | 2,189 | | | $ | — | | | $ | — | | | $ | 3,129 | | | $ | — | | | $ | — | |
| Other investments | 954 | | | 267 | | | — | | | 995 | | | 750 | | | — | |
| Total financial assets | $ | 3,143 | | | $ | 267 | | | $ | — | | | $ | 4,124 | | | $ | 750 | | | $ | — | |
| Financial liabilities: | | | | | | | | | | | |
| Total financial liabilities | $ | — | | | $ | — | | | $ | — | | | $ | — | | | $ | — | | | $ | — | |
23. Financial risk management:
The Company is exposed in varying degrees to credit risk through its use of financial instruments.
The Company’s principal financial assets are cash and cash equivalents and accounts receivable. The Company’s credit risk is primarily attributable to its accounts receivable. The Company’s maximum exposure to credit risk is approximately $0.5 million. The Company regularly reviews its receivables and the economic conditions to determine whether an allowance for expected losses is necessary.
Cash at bank is held with credit worthy financial institutions.
The Company has no significant concentration of credit risk other than its accounts receivable and the Company’s credit risk has not changed significantly during the years ended December 31, 2025, 2024 and 2023.
24. Segment reporting:
The Company’s President & Chief Executive Officer is the Chief Operating Decision Maker (“CODM”) of the Company. The CODM evaluates how the Company allocates resources, assesses performance and makes strategic and operational decisions. Based upon such evaluation, the Company has determined that it has four reportable segments.
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
The Company’s reportable segments are the Santa Cruz Copper Project, critical metals, data processing and energy storage.
The Santa Cruz Copper Project and critical metals segments are focused on mineral project exploration and development with a focus on identifying and developing mineral projects, and ultimately mines, associated with the metals necessary for electrification. The Santa Cruz Copper Project is at a more advanced stage relative to most of the Company’s other mineral exploration projects and its discrete financial information and operating results are regularly reviewed by the CODM in order to make decisions about resource allocation and assess performance.
The data processing segment provides data analytics, geophysical modeling and artificial intelligence services for the mineral, oil & gas and water exploration industries. The energy storage segment develops, manufactures and installs vanadium flow batteries for grid-scale energy storage.
Segment information for the periods presented is as follows:
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| As at and for the year ended December 31, 2025 |
| Santa Cruz Copper Project | | Critical Metals | | Data Processing | | Energy Storage | | Total |
| Revenue | $ | — | | | $ | — | | | $ | 3,244 | | | $ | — | | | $ | 3,244 | |
| Intersegment revenues | — | | | — | | | 57 | | | — | | | 57 | |
| Loss (income) from operations | 23,998 | | | 77,413 | | | (1,239) | | | 13,399 | | | 113,571 | |
| Depreciation and amortization | 165 | | | 2,744 | | | 42 | | | — | | | 2,951 | |
| Segment assets | 187,851 | | | 239,684 | | | 2,856 | | | 52,882 | | | 483,273 | |
| Expenditures for segment assets | 730 | | | 1,574 | | | 5 | | | — | | | 2,309 | |
| Investments subject to significant influence | — | | | 10,416 | | | 827 | | | 47,156 | | | 58,399 | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| As at and for the year ended December 31, 2024 |
| Santa Cruz Copper Project | | Critical Metals | | Data Processing | | Energy Storage | | Total |
| Revenue | $ | — | | | $ | — | | | $ | 2,831 | | | $ | 70 | | | $ | 2,901 | |
| Intersegment revenues | — | | | — | | | 177 | | | — | | | 177 | |
| Loss from operations | 72,465 | | | 97,277 | | | (831) | | | 8,040 | | | 176,951 | |
| Depreciation and amortization | 153 | | | 1,983 | | | 57 | | | 510 | | | 2,703 | |
| Segment assets | 179,469 | | | 131,492 | | | 2,799 | | | 61,172 | | | 374,932 | |
| Expenditures for segment assets | 10,356 | | | 3,120 | | | — | | | 94 | | | 13,570 | |
| Investments subject to significant influence | — | | | 23,518 | | | 769 | | | 40,600 | | | 64,887 | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| For the year ended December 31, 2023 |
| Santa Cruz Copper Project | | Critical Metals | | Data Processing | | Energy Storage | | Total |
| Revenue | $ | — | | | $ | — | | | $ | 1,300 | | | $ | 2,603 | | | $ | 3,903 | |
| Intersegment revenues | — | | | — | | | 100 | | | — | | | 100 | |
| Loss from operations | 57,833 | | | 111,634 | | | 1,363 | | | 9,572 | | | 180,402 | |
| Depreciation and amortization | 87 | | | 975 | | | 995 | | | 583 | | | 2,640 | |
Table of Contents
IVANHOE ELECTRIC INC.
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
(Tabular amounts expressed in thousands of U.S. dollars, unless otherwise indicated)
The following tables illustrate the geographic makeup of the Company’s revenues and long-lived assets.
| | | | | | | | | | | | | | | | | | | | |
| | Year ended December 31, |
| Revenue | | 2025 | | 2024 | | 2023 |
| Canada | | $ | 3,244 | | | $ | 2,831 | | | $ | 1,300 | |
| China | | — | | | 70 | | | 2,603 | |
| Total | | $ | 3,244 | | | $ | 2,901 | | | $ | 3,903 | |
Revenues are attributed to countries based on the location in which the sale originated.
| | | | | | | | | | | | | | |
| | As at December 31, |
| Long-lived assets | | 2025 | | 2024 |
| United States | | $ | 211,284 | | | $ | 210,337 | |
| Colombia | | 19,695 | | | 20,344 | |
| Peru | | — | | | 2,561 | |
| Other | | 748 | | | 595 | |
| Total | | $ | 231,727 | | | $ | 233,837 | |
Long-lived assets comprise the Company’s exploration mineral interests (excluding a mineral royalty) and property, plant and equipment.
Long-lived assets reconcile to segment assets and the balance sheet as follows:
| | | | | | | | | | | |
| As at December 31, |
| 2025 | | 2024 |
| Total long-lived assets | $ | 231,727 | | | $ | 233,837 | |
| Total current assets | 180,193 | | | 69,286 | |
| Mineral royalty | 1,707 | | | 1,707 | |
| Investments subject to significant influence | 58,399 | | | 64,887 | |
| Other investments | 1,221 | | | 1,745 | |
| Other non-current assets | 10,026 | | | 3,471 | |
| Total assets and segment assets | $ | 483,273 | | | $ | 374,932 | |
25. Commitments and contingencies:
The Company has entered into a contractual arrangement to purchase six Typhoon™ transmitters from I-Pulse (Note 20).
In the ordinary course of business, the Company may be involved in various legal proceedings and subject to claims that arise. Although the results of litigation and claims are inherently unpredictable and uncertain, the Company is not currently a party to any legal proceedings the outcome of which, if determined adversely to the Company, are believed to, either individually or taken together, have a material adverse effect on the Company’s business, financial condition or results of operations.
Item 9. Changes in and Disagreements With Accountants on Accounting and Financial Disclosures
None
Item 9A. Controls and Procedures
Disclosure Controls and Procedures
Our management, under the supervision and with the participation of our Chief Executive Officer and our Chief Financial Officer, our principal executive and principal financial officers, respectively, conducted an evaluation of the effectiveness of the design and operation of our disclosure controls and procedures, as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act of 1934, as amended, as of the end of the period covered by this Annual Report. Based on an evaluation under the supervision of our Chief Executive Officer and our Chief Financial Officer, it was concluded that, as of the end of the period covered by this report, our disclosure controls and procedures were effective:
(a) to ensure that information that we are required to disclose in reports that we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in SEC rules and forms and
(b) to include, without limitation, controls and procedures designed to ensure that information required to be disclosed by us in reports filed or submitted under the Exchange Act is accumulated and communicated to our management, including our Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure.
Management’s Annual Report on Internal Control over Financial Reporting
Management of Ivanhoe Electric is responsible for establishing and maintaining adequate internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting. Ivanhoe Electric's management assessed the effectiveness of the Company's internal control over financial reporting as of December 31, 2025, in accordance with the criteria established in Internal Control – Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission (“COSO”). Based on the management’s assessment, Ivanhoe Electric's internal control over financial reporting was effective as of December 31, 2025.
Deloitte LLP, an Independent Registered Public Accounting Firm, has audited the Company’s internal control over financial reporting as of December 31, 2025, and as stated in the Report of Independent Registered Public Accounting Firm, they have expressed an unqualified opinion on the effectiveness of the Company’s internal control over financial reporting as of December 31, 2025.
Inherent Limitations over Internal Controls
The Company’s internal control over financial reporting is designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with U.S. GAAP. The Company’s internal control over financial reporting includes those policies and procedures that:
(a)pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the Company’s assets;
(b)provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with U.S. GAAP, and that the Company’s receipts and expenditures are being made only in accordance with authorizations of the Company’s management and directors; and
(c)provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the Company’s assets that could have a material effect on the financial statements.
Management, including the Company’s Chief Executive Officer and Chief Financial Officer, does not expect that the Company’s internal controls will prevent or detect all errors and all fraud. A control system, no matter how well designed and operated, can provide only reasonable, not absolute, assurance that the objectives of the control system are met. Further, the design of a control system must reflect the fact that there are resource constraints, and the benefits of controls must be considered relative to their costs. Because of the inherent limitations in all control systems, no evaluation of internal controls can provide absolute assurance that all control issues and instances of fraud, if any, have been detected. Also, any evaluation of the effectiveness of controls in future periods are subject to the risk that those internal controls may become inadequate because of changes in business conditions, or that the degree of compliance with the policies or procedures may deteriorate.
Attestation Report of the Independent Registered Public Accounting Firm
This Annual Report includes an attestation report of our registered public accounting firm regarding internal control over financial reporting, as presented in Item 8.
Changes in Internal Control over Financial Reporting
There were no changes in our internal control over financial reporting identified in connection with the evaluation required by Rule 13a-15(d) and 15d-15(d) of the Exchange Act that occurred during the quarter ended December 31, 2025 that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.
Item 9B. Other Information
During the quarterly period ended December 31, 2025, no director or officer (as defined in Rule 16a-1(f) under the Exchange Act) adopted or terminated any Rule 10b5-1 trading arrangement or non-Rule 10b5-1 trading arrangement.
Item 9C. Disclosure Regarding Foreign Jurisdictions that Prevent Inspections
Not applicable.
Part III
Item 10. Directors, Executive Officers and Corporate Governance
The following table sets forth information regarding our directors and executive officers as of February 20, 2026.
| | | | | | | | | |
| Name | Age | Position | |
| Robert Friedland | 75 | Executive Chairman of the Board of Directors | |
| Taylor Melvin | 56 | Chief Executive Officer, President and Director | |
| Russell Ball | 57 | Director | |
| Hirofumi Katase | 66 | Director | |
| Priya Patil | 63 | Director | |
| Patrick Loftus-Hills | 59 | Director | |
| Ronald Vance | 73 | Director | |
| Victoire de Margerie | 62 | Director | |
| Sofia Bianchi | 69 | Director | |
| Jordan Neeser | 43 | Chief Financial Officer | |
| Quentin Markin | 53 | Executive Vice President, Business Development and Strategy Execution | |
| Graham Boyd | 40 | Senior Vice President, Exploration | |
| Glen Kuntz | 58 | Senior Vice President, Mine Development | |
| Cassandra Joseph | 54 | General Counsel and Corporate Secretary | |
| Stephani Terhorst | 47 | Vice President, Human Resources | |
Biographical Information
Robert Friedland has served as Executive Chairman of the Board of Directors since November 21, 2022. Prior to that time, Mr. Friedland was Chief Executive Officer from July 16, 2020 to November 21, 2022, and Chairman of the Board from June 30, 2021 to November 21, 2022. Mr. Friedland has over thirty years of experience and has been recognized by leaders of the international financial sector and mineral resource industries as an entrepreneurial explorer, technology innovator and company builder. Since July 1988, Mr. Friedland has served as President, Chief Executive Officer and Founder of Ivanhoe Capital Corporation, a family office and investment company. He is the founder of Ivanhoe Mines Ltd. and has served as Executive Co-Chairman since September 2018 (previously Executive Chairman). He has also been Chairman of I-Pulse Inc. since February 2009 and Chief Executive Officer since June 2023. Since June 2018, he has served as Chairman of VRB Energy Inc., and was Co-Chair of SK Global Entertainment Inc. from February 2017 to December 2021. As one of the most recognized mining executives and achievers in the world, Mr. Friedland is dedicated to serving on numerous boards in the natural resources sector. These positions include: Co-Chairman of Sunrise Energy Metals Limited (formerly Clean TeQ Holdings Limited) since September 2016; Chief Executive Officer of High Power Exploration Inc. (now Ivanhoe Atlantic Inc.) from December 2015 to July 2022 and Chairman from January 2018 to July 2022; a Director of Blue Spark Energy Systems Inc. from May 2024 to August 2025 and Director of Pure Lithium Corporation from April 2022 to December 2025; and Chairman of Gold X Mining Corp. from June 2020 until its acquisition by Gran Colombia in June 2021. Mr. Friedland was the Chief Executive Officer from July 2020 to February 2022, and a founder of Ivanhoe Capital Acquisition Corp., a NYSE-listed special purpose acquisition corporation that completed its merger with SES AI Corporation (“SES”), a lithium-metal battery developer. He served as a Director of SES until March 15, 2023. Mr. Friedland graduated with a degree in political science from Reed College.
Taylor Melvin has served as our Chief Executive Officer, President, and a member of our Board of Directors since November 2022. Mr. Melvin has over twenty years of experience in the natural resources sector as a senior corporate development professional and investment banker. Prior to joining Ivanhoe Electric, Mr. Melvin served as President and Chief Executive Officer of Battery Metals Streaming Corp. from March 2022 to August 2022. Prior to that, Mr. Melvin served as Vice President, Corporate Development of Freeport-McMoRan Inc. (NYSE: FCX), a leading international mining company focused on copper, headquartered in Phoenix, Arizona, from June 2018 to March 2022, after having served as its Director Finance & Business Development since 2008. Before joining Freeport-McMoRan Inc. in 2008, Mr. Melvin was an Executive Director in J.P. Morgan’s Natural Resources investment banking group in New York. Mr. Melvin received his Bachelor of Science in Business Administration and his Master of Business from the University of North Carolina at Chapel Hill.
Russell Ball has served as a Director since June 30, 2022. He is Chair and a member of the Audit Committee and also serves as a member of the Compensation and Nominating Committee. Mr. Ball is an international mining executive with over thirty years of experience. He was the Chief Executive Officer of Calibre Mining Corp. (TSX: CXB) from October 2019 to February 2021 and Chair of its board from November 2018 to October 2019. From May 2013 to December 2017, Mr. Ball held various executive positions with Goldcorp Inc. (TSX: G; NYSE: GG), including Executive Vice President Corporate Development and Chief Financial Officer from March 2016 to December 2017. Prior to that, he held various positions with Newmont Mining Corporation (NYSE: NEM) from 1994 to 2013, including Executive Vice President and Chief Financial Officer from June 2008 to May 2013. Mr. Ball currently serves as Non-Executive Chair of the board of Faraday Copper Corp. (TSX:FDY) and as a Director of Southern Silver Exploration Corp (TSX.V: SSL), Thesis Gld Corp, (TSX.V: TAU), and Compass Minerals (NYSE: CMP). He is a Chartered Accountant (South Africa) and a Certified Public Accountant in the United States. Mr. Ball holds a Master’s in Accounting and a Post-Graduate Diploma in Accounting from the University of Natal (South Africa).
Hirofumi Katase has served as a Director since January 2022. Mr. Katase has served as Executive Vice Chairman, Director General of Industrial Science and Technology, Executive Vice Chairman, a member of the Board of Directors of I-Pulse Inc. and President of I-Pulse Japan Co., Ltd., I-Pulse’s operating subsidiary in Japan since December 2017. Mr. Katase has been the Chief Executive Officer of G-Pulse Inc., a subsidiary of I-Pulse developing a drilling technology based on high pulsed power, since February 2022 and has served as Chairman of Geo Dreams Inc. since January 2022. Mr. Katase served as a Director of VRB Energy since February 2022; a Director of Geo Power Innovations since September 2019; a Director of MinebeaMitsumi, a manufacturing company, since July 2021; and as Present representative Director of Ibis Inc. since June 2021. Prior to these roles, he most recently served as Japan’s Vice Minister for International Affairs at the Ministry of the Economy, Trade and Industry (“METI”) from June 2016 to July 2017. He held numerous management positions in trade, energy and industrial policy at METI since joining in 1982. During his time at METI, Mr. Katase served in multiple Director General positions, including for the Industrial Science and Technology Policy and Environment Bureau and Trade Policy Bureau, where he led efforts that contributed to the signing of the Trans-Pacific Partnership, among other international agreements. He also was previously Deputy Secretary-General of the Secretariat of Strategic Headquarters for Space Policy at the Cabinet Office, where he helped establish the Office of National Space Policy, the headquarters responsible for Japan’s development of space policy and deployment of space infrastructure. He was also a Director of the Oil and Natural Gas division at METI, where he led Japan’s upstream hydrocarbon policy for four years. At METI, he also served as a Director of the Aerospace and Defense Industry division where he worked on launching the Mitsubishi Regional Jet (MRJ) program and cultivated international partnerships for the development of aircraft and aircraft engines. Mr. Katase earned a Bachelor’s degree in law from the University of Tokyo and a Master’s degree in applied economics from the University of Michigan.
Patrick Loftus-Hills has served as a Director since March 2023 and is a member of the Compensation and Nominating Committee and the Health, Safety and Environmental Committee. He brings over forty years of experience in the global mining industry and has served as a Senior Advisor at Moelis & Company, a New York-based investment bank, since 2011. He was a Partner and Managing Director at Moelis & Company from 2011 to December 2021. Since February 2025, Mr. Loftus-Hills has served as a Senior Advisor to Oryx Global Partners, an Abu Dhabi, UAE based mining private equity firm. Prior to joining Moelis & Company in 2011, he was the Joint Head of the Asian Industrials Group and Head of Natural Resources at UBS in Hong Kong and held leadership roles in the UBS’s global mining team in New York and Australia. Over his career, Mr. Loftus-Hills spent almost thirty years in investment banking advising global mining companies on a range of transactions, including cross-border mergers and acquisitions and capital raises as well as seven years as a lawyer advising major mining companies. Mr. Loftus-Hills served as a Managing Member - Advisor of Sweetwater Royalties LLC, an Orion Resource Partners portfolio company, from May 2022 to May 2025. He is Chair of the Monash University US Leadership Council, Chair of the US Friends of the Australian Chamber Orchestra, Co-Chair of Global Australians and Chair of the AUS USA Foundation. He holds degrees in Law and Science and an Honorary Doctor of Laws from Monash University in Australia.
Victoire de Margerie has served as a Director since June 30, 2022. Prof. de Margerie is the Executive Chairman/Reference Shareholder of Rondol Industrie SAS, a deep technology startup that develops extrusion machinery for drug formulations and other high tech applications since 2012. Since 2014, Prof. de Margerie has served as Founder and Co Chairman of World Materials Forum, since 2019, an Academician at the National Academy of Technologies of France, since 2020 a Board Director of Paris School of Mines (France), and since 2025, a Board Director of Boliden (Sweden, Mining). Altogether 40 years in the Materials Industry in Canada, France, Germany, the United Kingdom and the United States, first as an executive and since 2006 as a Board Director. Prof. de Margerie was a Director of Eurazeo (Euronext Paris) from 2012 to 2024, a Director and Chair of the Innovation & Growth Committee of Arkema SA (Euronext Paris: AKE) from 2012 to 2023, a Director of Babcock International Group (LSE: BAB) from 2016 to 2021, a Director of Morgan Ceramics from 2012-2016, a Director of Norsk Hydro from 2012 to 2014, and a Director at Outokumpu from 2007-2011. She was previously a Director of European industrial companies such as Italcementi from 2006-2016. Prof. de Margerie was also a Professor of Strategy & Technology Management at Grenoble School of Management between 2003
and 2011. Prof. de Margerie graduated initially from HEC Paris and Sciences Po Paris and holds a PhD in Management from Université de Paris 2.
Priya Patil has served as a Director of since June 30, 2022. She is Chair and a member of the Compensation and Nominating Committee ad also serves as a member of the Audit Committee. Ms. Patil is an experienced corporate director, former senior public company executive, and investment banker. She began serving as an independent corporate director of public companies in 2016 and has served as a volunteer board member of universities and other economic-focused organizations since 2003. From 2014 to 2026, Ms. Patil was Head, Business Development (Diversified Industries) of the Toronto Stock Exchange. She previously served as Managing Director, Partner and Founding Partner (Eastern Operations) of PI Financial Corp. and as Managing Director, Partner and Head of Investment Banking of Loewen Ondaatje McCutcheon. Ms. Patil also served as Global General Corporate Counsel of Breakwater Global Resources Ltd, a Canadian and U.S. listed mining company. She started her career as an attorney with Brobeck, Phleger & Harrison LLP in Palo Alto, California. From February 2021 to August 2024, Ms. Patil was a director of Rambler Metals & Mining PLC (AIM of LSE: RMM), where she was Chair of the Compensation, Governance and Nominations Committee and a member of its Audit and Safety, Health, Environment and Community Committees. She also served as a director of Signature Resources Ltd. (TSX-V: SIG) from September 2021 to May 2022 and as an advisory board member from May 2022 to September 2023. From October 2016 to August 2019, Ms. Patil was an Independent Corporate Director of Alexandria Minerals Inc., serving as Chair of its Audit Committee and as a member of its Management & Special Committee. Ms. Patil holds a Juris Doctor degree from the University of Ottawa and a Bachelor of Science degree in Statistics and Computer Sciences from the University of Bombay. She has completed the Directors Education Program at the Rotman School of Management (University of Toronto) and the Innovation Governance Program of the Council of Canadian Innovators. Ms. Patil is a member of the State Bar of California and the Law Society of Ontario and Charter of the Institute of Corporate Directors. She served as a Board Member of the Council of Great Lakes Region and as a Board Member of the Association of Corporate Growth from 2015 to 2019. She also served on the advisory boards of the University of Ottawa, Faculty of Law and Metropolitan Toronto University, Digital Media Zone from 2016 to 2019.
Ronald Vance has served as a Director since June 2023 and is Chair of the Health, Safety and Environmental Committee and a member of the Audit Committee. Mr. Vance is a corporate director and retired senior executive with a distinguished track record in corporate development, corporate finance advisory and marketing management. He has over forty years of experience in mining and corporate development. Mr. Vance retired from Teck Resources Limited where he served as Senior Vice President, Corporate Development from 2006 to 2014. Prior to joining Teck Resources, he worked as a Managing Director of Rothschild (Denver) Inc. from 1991 to 2000 and as Managing Director/Senior Advisor of Rothschild Inc. from 2000 to 2005. Since 2013, Mr. Vance currently serves as an independent director of Royal Gold Inc. (NASDAQ: RGLD) and serves as a member of its Audit and Finance Committee. Mr. Vance served as Chairman of the Board of Southern Peaks Mining, L.P. in 2018.
Sofia Bianchi has served as a Director since July 2023 and is a member of the Health, Safety and Environmental Committee. Ms. Bianchi has over thirty years of experience in finance and has held numerous executive and director roles internationally. She has been the founding partner at Atlante Capital Partners, an investment firm focused on financial restructuring, since May 2016. Ms. Bianchi also serves as a Non-Executive Director and Chair of the Corporate Governance Committee of Mineros S.A. (TSX: MSA, OTCQX: MNSAF, BVC: MINEROS) since March 2024 and as Chair of Canagold Resources Ltd. (CCM:CA) since July 2022. She also serves as a Non-Executive Director of Saudi Arabian Mining Company (“Maaden”) (Saudi Stock Exchange Tadawul)) since December 2022 and as a Non-Executive Director of Manara Minerals Investment Company of Riyadh, Saudi Arabia, a joint venture between Maaden and the Public Investment Fund to invest in mining assets globally since June 2023. In addition, Ms. Bianchi has served as a Non-Executive Director of Sitex SA since 2017 and Spitex Perspecta AG (SOL SpA Group) since 2019, both of which specialize in home-based healthcare services, and as an Independent Non-Executive Director of Yellow Cake plc. (AIM:YCA), a uranium company, since 2018. She previously served as a director of Feronia Inc. (TSX) from January 2019 to February 2020; Endeavour Mining Corporation (TSX & LSE) from November 2019 to May 2022; Kenmare Resources (LSE & Dublin Stock Exchange) from April 2008 to May 2017; and ARM Cement PLC (Nairobi Securities Exchange) from January 2018 to January 2019. Previously Ms. Bianchi was Head of Special Situations at the CDC Group from 2018 to 2020 and at BlueCrest Capital Management from 2007 to 2016. Ms. Bianchi holds a Master’s degree in finance from the University of Pennsylvania – Wharton Business School, and a Bachelor of Arts degree in Economics from George Washington University.
Jordan Neeser has served as our Chief Financial Officer since November 21, 2022. Since June 2024, he has served as a Director of Cordoba Minerals Corp. (TSXV). Mr. Neeser is a finance executive with over twenty years of experience in financial reporting, corporate development, and corporate finance, primarily in the mining sector. From March 2021, Mr. Neeser served as Chief Financial Officer and Corporate Secretary at Gold Standard Ventures (TSX) until it was acquired by Orla Mining (TSX:OLA) in August 2022. He also served as Chief Financial Officer of Conifex Timber Inc. (TSX:CFF) from December 2018 to March 2021, and spent eight years with First Quantum (TSX:FM) as both Group Controller and
Director, Business Development. Mr. Neeser started his career with KPMG, as a Chartered Public Accountant, Chartered Accountant, and holds a Bachelor of Commerce degree from the University of British Columbia, Vancouver, Canada.
Quentin Markin has served as our Executive Vice President, Business Development and Strategy Execution since January 1, 2023. Since September 2023, he has served as a Director of Cordoba Minerals Corp. (TSXV). Mr. Markin is a seasoned mining lawyer with over twenty years of experience, all with the Canadian firm Stikeman Elliott LLP, where he had been a partner since 2008. Over his career, he has lived and practiced in the world’s mining centers — Sydney, London, Vancouver and Toronto. Mr. Markin’s practice focused on M&A, project development and financing matters for mining companies globally and has been recognized by international legal consultancy Chambers for eleven years as a mining law expert. Prior to joining the Company, Mr. Markin acted as legal counsel for the Company since its inception, as well as other Ivanhoe group companies, including Ivanhoe Mines, but also senior producers, junior exploration companies, and investment banks. His notable transactions outside of the Ivanhoe Group include the 2007 Cdn$1.2 billion initial public offering of Franco-Nevada and the 2015 acquisition by OceanaGold of Romarco Minerals and its Haile Gold Mine located in South Carolina for around Cdn$856 million. Mr. Markin received his Bachelor of Law Degree from the University of Ottawa, Canada, and holds an M.A. in International Relations from the Norman Patterson School of International Affairs, Ottawa, Canada.
Graham Boyd has served as our Senior Vice President, Exploration since August 7, 2023. Previously he served as our Senior Vice President and Vice President, U.S. Projects since November 2022 and June 2021, respectively, to August 2023. Mr. Boyd is a Geologist with over twenty years of base and precious metals experience, having worked principally in Australia, North America and South America and continuingly being responsible for the identification, review, acquisition and execution of numerous exploration projects, particularly those that form our portfolio of projects in the United States. Prior to joining the Company, Mr. Boyd worked various roles including as Principal and Senior Geologist within High Power Exploration Inc. (“HPX”) (now Ivanhoe Atlantic Inc.) since 2013. While with HPX, Mr. Boyd was a leader in the delineation and exploration success of the Alacran and San Matias Cu-Au- Ag deposits in Colombia. Prior to HPX, Mr. Boyd held roles with Ivanhoe Australia and Ivanhoe Mines Mongolia, since 2006. At Ivanhoe Australia, Mr. Boyd was a member of the discovery team for the world’s highest grade Mo-Re deposit, Merlin, and he also was a key contributor to delineation and resource development of the Mount Dore Cu and Mt Elliott- SWAN Cu-Au deposits. Prior to roles in the Ivanhoe Group, Mr. Boyd worked on copper porphyries in British Columbia, and diamond exploration in Nunavut and Quebec. Mr. Boyd holds a Bachelor of Science in Geoscience from the University of Victoria.
Glen Kuntz has served as our Senior Vice President, Mine Development since November 21, 2022. Previously, Mr. Kuntz served as our Chief Technical and Innovation Officer from January 2022 to November 2022. He is also Vice President of Mesa Cobre Corporation, one of our subsidiaries, since April 2022, and a director of Cordoba Minerals Corp. (TSXV) since May 2025. Mr. Kuntz is a Qualified Person, Professional Geologist and mining executive with over thirty years of experience focused on exploration, development and operations (underground and open pit), technology, and studies across a variety of commodities and mining types/methods throughout the Americas, Africa and Australia. Prior to joining the Company, Mr. Kuntz was a consulting specialist geology/mining at Nordmin Engineering Ltd. from March 2018 to January 2022; director of exploration projects at Yamana Gold Inc. from 2015 to 2018; President and Chief Executive Officer from 2012 to 2015 and Chief Operating Officer from 2011 to 2012 of Mega Precious Metals Inc., a successful junior exploration company acquired by Yamana Gold. Mr. Kuntz gained significant development/production experience in a variety of other senior positions with Runge Ltd., Placer Dome Corporation, and Rea Gold Corporation. Mr. Kuntz holds a Bachelor of Science in Geology from the University of Manitoba.
Cassandra Joseph has served as the Company’s General Counsel and Corporate Secretary since February 1, 2023. Ms. Joseph is an accomplished U.S. mining industry legal executive with over twenty years of experience in corporate, environmental and intellectual property law. Since May 2024, she has served as a Director of i-80 Gold Corp. (IAUX;NYSE, IAU:TSX). Ms. Joseph was previously lead independent Director and the Chair of the Corporate Governance Nominations and Compensation Committee of Bunker Hill Mining Corporation from 2020 to 2024 (XCNQ:BNKR). Before joining the Company, Ms. Joseph was Senior Vice President and General Counsel for Nevada Copper in Reno, Nevada from May 2019 to January 2023. Prior to Nevada Copper, she served as Vice President, Associate General Counsel, Corporate Secretary, and Chief Compliance Officer from 2015 to 2019 for Reno, Nevada-based Tahoe Resources prior to its sale to Pan American Silver in May 2019. Ms. Joseph worked in the Nevada Attorney General’s Office, representing the Division of Environmental Protection, the Division of Water Resources, and other agencies within the Department of Natural Resources. She holds a Juris Doctor from Santa Clara University School of Law and a Bachelor of Arts from the University of California, Berkeley.
Stephani Terhorst has served as our Vice President Human Resources since March 1, 2023. Ms. Terhorst is an accomplished human resources and employee benefits professional with over twenty-five years of human resources experience, primarily in the coal and aggregates mining sector. From 2016 to 2022, Ms. Terhorst was the Senior Director of Human Resources and Benefits with NACCO Industries, a coal producer in Dallas, Texas. She served as Director of
Human Resources for Jennmar Corporation, which manufactures various underground mining products. Ms. Terhorst is a Certified Employee Benefits Specialist, Professional in Human Resources, and Group Benefits Associate certified. She holds a Bachelor's degree in Human Resources Management from the University of Pittsburgh and a Master's degree in Human Resources and Industrial Relations from St. Francis University.
Code of Business Conduct and Ethics
Our Board of Directors has adopted a Code of Business Conduct and Ethics (“Code of Conduct”) applicable to our employees, directors and officers, in accordance with applicable United States federal securities laws and the corporate governance requirements of the NYSE American. A current copy of the Code of Conduct is available on the Corporate Governance section of our website.
The Board of Directors is responsible for overseeing the Code of Conduct. Any waivers of the Code of Conduct for directors or executive officers must be approved by our Board of Directors and disclosed on Form 8-K within four business days after the occurrence of the event. We expect that any amendments to the Code of Conduct, or any waivers of its requirements with respect to our executive officers and directors, will be disclosed on our website at the address indicated above, which is our recognized channel of communication for investors for purposes of Regulation FD. Our website and the information contained therein or connected thereto shall not be deemed to be incorporated into this Annual Report.
The information required by this item is incorporated by reference to our definitive Proxy Statement for our 2026 Annual Meeting of Stockholders (the "2026 Proxy Statement"), which will be filed with the SEC not later than 120 days after December 31, 2025.
Item 11. Executive Compensation
The information required by this item is incorporated by reference to the 2026 Proxy Statement.
Item 12. Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters
The information required by this item is incorporated by reference to the 2026 Proxy Statement.
Equity Compensation Plan Information
Information about our equity compensation plans at December 31, 2025 was as follows:
| | | | | | | | | | | |
Plan Category | Number of securities to be issued upon exercise of outstanding options and rights A | Weighted-average exercise price of outstanding options, warrants and rights(1) B | Number of securities remaining available for future issuance under equity compensation plans (excluding securities reflected in column A) C |
Equity compensation plans approved by stockholders (2022 LTIP) | 7,120,027(2) | $12.83 | 14,757,072(3) |
Equity compensation plans not approved by stockholders (2021 LTIP) | 1,581,665 | $2.49 | 0 |
Total | 8,701,692 | $10.38 | 14,757,072 |
(1) The weighted-average exercise price does not reflect the shares that will be issued in connection with the settlement of RSUs, DSUs or PSUs since RSUs, DSUs and PSUs have no exercise price.
(2) Consists of 5,097,541 shares of common stock issuable upon the exercise of stock options, 1,181,695 shares of common stock deliverable upon settlement of RSUs, 162,266 shares of common stock deliverable upon settlement of DSUs, and 678,525 shares of common stock deliverable upon settlement of PSUs, assuming that PSUs vest at target. The number of PSUs that vest is based on performance criteria and ranges between zero times to two times the target number of PSUs.
(3) Shares available for issuance under the 2022 LTIP, which may be used for any type of award authorized under the 2022 LTIP, including stock options, stock appreciation rights, restricted stock, restricted stock units, deferred stock units, other stock or cash-based awards, and dividend equivalents. The number of shares available for issuance under the 2022 LTIP Plan is subject to (i) an annual increase on the first day of each year ending in 2032 equal to the lesser of (A) five percent (5%) of the shares of common stock outstanding on the last day of the immediately preceding fiscal year and (B) such smaller number of shares of common stock as determined by the Board, and (ii) increase by the amount, if any, equal to the number of awards under the 2021 LTIP that terminate, expire or lapse for any reason without the delivery of shares of common stock to the holder thereof or are repurchased by the Company at the original purchase price thereof. The Board elected to waive the annual increase that would otherwise have taken effect on January 1, 2026.
Item 13. Certain Relationships and Related Transactions, and Director Independence
The information required by this item is incorporated by reference to the 2026 Proxy Statement.
Item 14. Principal Accounting Fees and Services
Our independent registered public accounting firm is Deloitte LLP (PCAOB ID No. 1208).
The information required by this item is incorporated by reference to the 2026 Proxy Statement.
Part IV
Item 15. Exhibits and Financial Statement Schedules
The following documents are filed as part of this Annual Report on Form 10-K:
(1) Financial Statements. See Item 8 “Financial Statements and Supplemental Information” elsewhere in this Annual Report on Form 10-K.
(2) Financial Statement Schedules. The following financial statement schedule is presented below.
Schedule II - Valuation and Qualifying Accounts
Financial statement schedules other than the above have been omitted because they are not applicable.
Schedule II - Valuation and Qualifying Accounts (in thousands)
| | | | | | | | | | | | | | | | | | | | | | | |
| Balance at beginning of year | | Charged to expense | | Charged to other accounts | | Balance at end of year |
| Provision for expected credit loss | | | | | | | |
| Year ended December 31, 2025 | $ | — | | | $ | 10,304 | | | $ | — | | | $ | 10,304 | |
| Year ended December 31, 2024 | — | | | — | | | — | | | — | |
| Year ended December 31, 2023 | — | | | — | | | — | | | — | |
| Deferred income tax valuation allowance | | | | | | | |
| Year ended December 31, 2025 | $ | 139,953 | | | $ | — | | | $ | 29,966 | | | $ | 169,919 | |
| Year ended December 31, 2024 | 117,154 | | | — | | | 22,799 | | | 139,953 | |
| Year ended December 31, 2023 | 71,063 | | | — | | | 46,091 | | | 117,154 | |
(3) Exhibits. The following exhibits are filed (or incorporated by reference herein) as part of this Annual Report on Form 10-K:
| | | | | | | | | | | | | | | | | | | | |
| | Incorporated by Reference | |
Exhibit Number | Description | Form | File No. | Exhibit | Filing Date | Filed / Furnished Herewith |
2.1 | Contribution Agreement dated as of April 30, 2021, between the High Power Exploration Inc. and the Registrant | S-1 | 333-265175 | 2.1 | May 24, 2022 | |
3.1 | Amended and Restated Certificate of Incorporation of the Registrant as currently in effect | 8-K | 001-41436 | 3.1 | June 9, 2025 | |
3.2 | Second Amended and Restated By-Laws of the Registrant as currently in effect | 8-K/A | 001-41436 | 3.1 | February 24, 2025 | |
4.1 | Description of Registrant’s Securities | | | | | * |
4.2 | Stockholders Agreement dated as of April 30, 2021, by and among the Registrant, I-Pulse Inc., Ivanhoe Industries, LLC, Point Piper, LLC, Century Vision Holdings Limited and Iridium Opportunity Fund A LP | S-1 | 333-265175 | 4.4 | May 24, 2022 | |
4.3 | First Amendment dated as of June 28, 2021 to the Stockholders Agreement dated as of April 30, 2021, by and among the Registrant, I-Pulse Inc., Ivanhoe Industries, LLC, Point Piper, LLC, Century Vision Holdings Limited and Iridium Opportunity Fund A LP | S-1 | 333-265175 | 4.5 | May 24, 2022 | |
4.4 | Second Amended and Restated Stockholders Agreement dated as of April 5, 2022, by and among the Registrant, I-Pulse Inc., Castelnau LLC, Robert Friedland, and each of the investors signatory thereto | S-1 | 333-265175 | 4.6 | May 24, 2022 | |
4.5 | Amended and Restated Registration Rights Agreement dated as of April 5, 2022, by and among the Registrant and the investors signatory thereto | S-1 | 333-265175 | 4.7 | May 24, 2022 | |
4.6^## | Warrant Agent Agreement including form of Warrant | | | | | * |
10.1 | Assignment Agreement dated as of October 27, 2021 by and among the Registrant, Mesa Cobre Holding Corporation, Central Arizona Resources, LLC, Presidio Group Inc., Russell Mining Corp., and Gold Coast Mining Inc. | S-1 | 333-265175 | 10.1 | May 24, 2022 | |
| | | | | | | | | | | | | | | | | | | | |
10.2 | Purchase and Sale Agreement between Mesa Cobre Holding Corporation and Wolff-Harvard Ventures, LLC dated May 10, 2023. | 8-K/A | 001-41436 | 10.1 | May 11, 2023 | |
10.3 | Secured Promissory Note between Mesa Cobre Holding Corporation and Wolff-Harvard Ventures, LP dated May 23, 2023 | | | | | * |
10.4 | Deed of Trust and Assignment of Rents between Mesa Cobre Holding Corporation and First American Title Insurance Company for the benefit of Wolff-Harvard Ventures, LP dated May 23, 2023 | 8-K | 001-41436 | 10.2 | May 24, 2023 | |
10.5 | Technology License Agreement dated as of March 23, 2012, between High Power Exploration Inc. and I-Pulse Inc | S-1 | 333-265175 | 10.3 | May 24, 2022 | |
10.6 | Technology License Agreement dated as of March 23, 2012, between High Power Exploration Inc. and HPX TechCo Inc. and GEO27 S.a.r.l | S-1 | 333-265175 | 10.4 | May 24, 2022 | |
10.7 | Patent License Agreement Amendment and Novation dated as of March 23, 2012, between High Power Exploration Inc. and GEO27 S.a.r.l. | S-1 | 333-265175 | 10.5 | May 24, 2022 | |
10.8 | Assignment and Novation Agreement, dated as of April 30, 2021, between High Power Exploration Inc. and each of I-Pulse Inc., HPX TechCo Inc. and GEO27 S.a.r.l. | S-1 | 333-265175 | 10.6 | May 24, 2022 | |
10.9 | Option Agreement for Purchase and Sale, dated August 16, 2021, by and between Central Arizona Resources, LLC and DRH Energy, Inc. | S-1 | 333-265175 | 10.7 | May 24, 2022 | |
10.11# | Purchase and Sale Agreement dated as of October 19, 2017 | S-1 | 333-265175 | 10.10 | June 21, 2022 | |
10.12# | Purchase and Sale Agreement dated as of October 4, 2018 | S-1 | 333-265175 | 10.11 | June 21, 2022 | |
10.13# | Purchase and Sale Agreement dated as of October 4, 2018 | S-1 | 333-265175 | 10.12 | June 21, 2022 | |
10.14# | Purchase and Sale Agreement dated as of October 4, 2018 | S-1 | 333-265175 | 10.13 | June 21, 2022 | |
10.15# | Purchase and Sale Agreement dated as of June 14, 2019 | S-1 | 333-265175 | 10.14 | June 21, 2022 | |
10.16## | Common Stock Subscription Agreement between Ivanhoe Electric Inc. and Saudi Arabian Mining Company (Maaden) dated May 15, 2023 | 8-K | 001-41436 | 10.1 | May 15, 2023 | |
10.17^ | Common Stock Subscription Agreement between Ivanhoe Electric Inc. and Saudi Arabian Mining Company (Maaden) dated October 23, 2023 | 8-K/A | 001-41436 | 10.1 | October 24, 2023 | |
10.18 | Investor Rights Agreement between Ivanhoe Electric Inc. and Saudi Arabian Mining Company (Maaden) dated July 6, 2023 | 10-Q | 001-41436 | 10.9 | August 14, 2023 | |
10.19 | Shareholders Agreement by and among Ivanhoe Electric Inc., Ivanhoe Electric Mena Holdings Ltd., Ma’aden Ivanhoe Electric Exploration and Development Limited Company and Saudi Arabian Mining Company (Maaden) dated July 6, 2023 | 10-Q | 001-41436 | 10.10 | August 14, 2023 | |
10.20 | Amendment to Shareholders’ Agreement in Respect of Maaden Ivanhoe Electric Exploration and Development Company dated November 1, 2023 | 10-K | 001-41436 | 10.20 | February, 26, 2024 |
|
10.21 | Amendment #2 (Revised) to Shareholders’ Agreement in respect of Ma’aden Ivanhoe Electric Exploration and Development Limited Company, dated June 25, 2025 | 8-K | 001-41436 | 10.1 | October 21, 2025 | |
10.22## | Purchase, Sale and Investment Agreement | 8-K | 001-41436 | 10.1 | October 15, 2024 | |
10.23## | VRB China Joint Venture Agreement | 8-K | 001-41436 | 10.2 | October 15, 2024 | |
10.24 | Cooperation Agreement | 8-K | 001-41436 | 10.3 | October 15, 2024 | |
10.25## | Exploration Alliance Agreement dated May 7, 2024 | 8-K | 001-41436 | 10.1 | May 8, 2024 | |
10.26= | Strategic Advisory Services Agreement between Cordoba Minerals Corp. and Robert Friedland dated December 3, 2020 | 10-K | 001-41436 | 10.49 | February 26, 2024 | |
10.27 | Underwriting Agreement dated as of September 14, 2023 | 8-K | 001-41436 | 1.1 | September 14, 2023 | |
10.28 | Underwriting Agreement dated as of February 12, 2025 | 8-K | 001-41436 | 1.1 | February 12, 2025 | |
10.29 | Underwriting Agreement Dated as of October 22, 2025 | 8-K | 001-41436 | 1.1 | October 22, 2025 | |
10.30##^ | Commercial Sale Offer and related Purchase Order dated May 8, 2025 | 8-K | 001-41436 | 10.1 | May 8, 2025 | |
10.31 | Waiver and Amending Agreement dated February 10, 2026 | 8-K | 001-41436 | 10.1 | February 10, 2026 | |
10.32## | Credit Agreement dated as of December 12, 2025 between Mesa Cobre Holding Corporation, as Borrower, National Bank of Canada as Administrative Agent and Collateral Agent and the Lenders party thereto. | 8-K | 001-41436 | 10.1 | December 15, 2025 | |
| | | | | | | | | | | | | | | | | | | | |
10.33= | Ivanhoe Electric Inc. Equity Incentive Plan | S-1 | 333-265175 | 10.15 | May 24, 2022 | |
10.34= | Long Term Incentive Plan | S-1 | 333-265175 | 10.16 | June 21, 2022 | |
10.35= | Form of Stock Option Agreement (Employees) pursuant to the Ivanhoe Electric, Inc. 2022 Long Term Incentive Plan | 10-K | 001-41436 | 10.24 | March 14, 2023 | |
10.36= | Form of Stock Option Agreement (CEO) pursuant to the Ivanhoe Electric, Inc. 2022 Long Term Incentive Plan | 10-K | 001-41436 | 10.25 | March 14, 2023 | |
10.37= | Form of Stock Option Agreement (Executive, 4-year vesting) pursuant to the Ivanhoe Electric, Inc. 2022 Long Term Incentive Plan | 10-K | 001-41436 | 10.26 | March 14, 2023 | |
10.38= | Form of Stock Option Agreement (Executive, 3-year vesting) pursuant to the Ivanhoe Electric, Inc. 2022 Long Term Incentive Plan | 10-K | 001-41436 | 10.27 | March 14, 2023 | |
10.39= | Form of Restricted Stock Unit Award Agreement (4-year vesting) pursuant to the Ivanhoe Electric, Inc. 2022 Long Term Incentive Plan | 10-K | 001-41436 | 10.28 | March 14, 2023 | |
10.40= | Form of Restricted Stock Unit Award Agreement (3-year vesting) pursuant to the Ivanhoe Electric, Inc. 2022 Long Term Incentive Plan | 10-K | 001-41436 | 10.29 | March 14, 2023 | |
10.41= | Form of Restricted Stock Unit Award Agreement (5-year vesting) pursuant to the Ivanhoe Electric, Inc. 2022 Long Term Incentive Plan | 10-K | 001-41436 | 10.31 | February 26, 2024 |
|
10.42= | Form of Non-Employee Director Deferred Stock Unit Award Agreement (3-year grant) | 10-K | 001-41436 | 10.30 | March 14, 2023 | |
10.43= | Form of Non-Employee Director Deferred Stock Unit Award Agreement (annual grant) | 10-K | 001-41436 | 10.31 | March 14, 2023 | |
10.44= | Form of Non-Employee Director Deferred Share Unit Award Agreement | 10-Q | 001-41436 | 99.1 | August 14, 2023 | |
10.45= | Form of Non-Employee Director Deferred Share Unit Award Agreement (without election) | 10-K | 001-41436 | 10.35 | February 26, 2024 | |
10.46= | Form of Performance Share Unit Award Agreement (3-year cliff vesting) pursuant to the Ivanhoe Electric, Inc. 2022 Long Term Incentive Plan | | | | | * |
10.47= | Cordoba Minerals Corp. Amended Long Term Incentive Plan | 10-KA | 001-41436 | 10.39 | February 28, 2025 | |
10.48= | Cordoba Minerals Corp. Amended Stock Option Plan | 10-KA | 001-41436 | 10.40 | February 28, 2025 | |
10.49= | VRB Energy Inc. (formerly JD Holding Inc.) Stock Option Plan | 10-K | 001-41436 | 10.38 | February 26, 2024 | |
10.50= | VRB Energy USA Inc. 2025 Stock Option Plan | | | | | * |
10.51= | Computational Geosciences Inc. Amended & Restated 2011 Incentive Stock Option Plan | 10-Q | 001-41436 | 10.3 | August 7, 2024 | |
10.52 | Form of Indemnification Agreement | S-1 | 333-265175 | 10.19 | June 21, 2022 | |
10.53 | Form of Director Indemnification Agreement | 8-K | 001-41436 | Schedule 6 of 10.1 | May 15, 2023 | |
10.54= | Employment Agreement between the Ivanhoe Electric Inc. and Taylor Melvin dated October 21, 2022 | 10-Q | 001-41436 | 10.1 | November 14, 2022 | |
10.55= | Employment Agreement between Ivanhoe Electric Inc. and Jordan Neeser dated November 17, 2022 | 8-K | 001-41436 | 10.2 | November 21, 2022 | |
10.56= | Executive Employment Agreement dated December 30, 2022 between the Company and Stephani Terhorst | 10-K | 001-41436 | 10.43 | February 26, 2024 | |
10.57= | Executive Employment Agreement dated January 4, 2023 between the Company and Cassandra Joseph | 10-Q | 001-41436 | 10.2 | May 15, 2023 | |
10.58= | Second Amended and Restated Executive Employment Agreement dated February 25, 2025 between the Company and Glen Kuntz | | | | | * |
10.59= | Amended and Restated Executive Employment Agreement dated August 7, 2023 between the Company and Quentin Markin | 10-Q | 001-41436 | 10.3 | August 14, 2023 | |
10.60= | Amended Executive Employment Agreement dated February 25, 2025 between the Company and Graham Boyd | | | | | * |
10.61= | Annual Compensation Letter- Robert Friedland | 8-K | 001-41436 | 10.1 | May 9, 2024 | |
10.62= | Amended Annual Compensation Letter- Robert Friedland | | | | | * |
14.1 | Code of Ethics |
|
|
|
| * |
19.1 | Insider Trading Policy | | | | | * |
21.1 | Subsidiaries of the Registrant | | | | | * |
23.1 | Consent of Deloitte LLP | | | | | * |
| | | | | | | | | | | | | | | | | | | | |
23.2 | Qualified Person Consent of Brian Cole for the NI 43-101 Technical Report titled “Pinaya Gold- Copper Project Technical Report” with an effective date of April 26, 2016 | | | | | * |
23.3 | Qualified Person Consent of Ronald G. Simpson for the NI 43-101 Technical Report titled “Pinaya Gold-Copper Project Technical Report” with an effective date of April 26, 2016 | | | | | * |
23.4 | Qualified Person Consent of BBA USA Inc. for the report titled “S-K 1300 Preliminary Feasibility Study & Technical Report Summary, Santa Cruz Copper Project, Arizona” dated June 23, 2025 | | | | | * |
23.5 | Qualified Person Consent of Burns & McDonnell Engineering Company Inc. for the report titled “S-K 1300 Preliminary Feasibility Study & Technical Report Summary, Santa Cruz Copper Project, Arizona” dated June 23, 2025 | | | | | * |
23.6 | Qualified Person Consent of Fluor Canada Ltd. for the report titled “S-K 1300 Preliminary Feasibility Study & Technical Report Summary, Santa Cruz Copper Project, Arizona” dated June 23, 2025 | | | | | * |
23.7 | Qualified Person Consent of Geosyntec Consultants, Inc. for the report titled “S-K 1300 Preliminary Feasibility Study & Technical Report Summary, Santa Cruz Copper Project, Arizona” dated June 23, 2025 | | | | | * |
23.8 | Qualified Person Consent of Haley & Aldrich, Inc. for the report titled “S-K 1300 Preliminary Feasibility Study & Technical Report Summary, Santa Cruz Copper Project, Arizona” dated June 23, 2025 | | | | | * |
23.9 | Qualified Person Consent of INTERA Incorporated for the report titled “S-K 1300 Preliminary Feasibility Study & Technical Report Summary, Santa Cruz Copper Project, Arizona” dated June 23, 2025 | | | | | * |
23.10 | Qualified Person Consent of KCB Consultants Ltd. for the report titled “S-K 1300 Preliminary Feasibility Study & Technical Report Summary, Santa Cruz Copper Project, Arizona” dated June 23, 2025 | | | | | * |
23.11 | Qualified Person Consent of Life Cycle Geo, LLC for the report titled “S-K 1300 Preliminary Feasibility Study & Technical Report Summary, Santa Cruz Copper Project, Arizona” dated June 23, 2025 | | | | | * |
23.12 | Qualified Person Consent of Met Engineering, LLC for the report titled “S-K 1300 Preliminary Feasibility Study & Technical Report Summary, Santa Cruz Copper Project, Arizona” dated June 23, 2025 | | | | | * |
23.13 | Qualified Person Consent of Paterson & Cooke USA, Ltd. for the report titled “S-K 1300 Preliminary Feasibility Study & Technical Report Summary, Santa Cruz Copper Project, Arizona” dated June 23, 2025 | | | | | * |
23.14 | Qualified Person Consent of Stantec Consulting Services Inc. for the report titled “S-K 1300 Preliminary Feasibility Study & Technical Report Summary, Santa Cruz Copper Project, Arizona” dated June 23, 2025 | | | | | * |
23.15 | Qualified Person Consent of Tetra Tech, Inc. for the report titled “S-K 1300 Preliminary Feasibility Study & Technical Report Summary, Santa Cruz Copper Project, Arizona” dated June 23, 2025 | | | | | * |
23.16 | Qualified Person Consent of Glen Kuntz | | | | | * |
23.17 | Qualified Person Consent of Colin Shaw | | | | | * |
31.1 | Certification of Principal Executive Officer Pursuant to Rules 13a-14(a) and 15d-14(a) under the Securities Exchange Act of 1934, as Adopted Pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 | | | | | * |
31.2 | Certification of Principal Financial Officer Pursuant to Rules 13a-14(a) and 15d-14(a) under the Securities Exchange Act of 1934, as Adopted Pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 | | | | | * |
32.1+ | Certification of Principal Executive Officer Pursuant to 18 U.S.C. Section 1350, as Adopted Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 | | | | | * |
| | | | | | | | | | | | | | | | | | | | |
32.2+ | Certification of Principal Financial Officer Pursuant to 18 U.S.C. Section 1350, as Adopted Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 | | | | | * |
96.1 | S-K 1300 Preliminary Feasibility Study & Technical Report Summary, Santa Cruz Copper Project, Arizona, Prepared by: Fluor Canada Ltd., BBA USA Inc., Burns & McDonnell Engineering Company, Inc., Geosyntec Consultants, Inc., Haley & Aldrich, Inc., INTERA Incorporated, KCB Consultants Ltd., Life Cycle Geo, LLC, Met Engineering, LLC, Paterson & Cooke USA, Inc., Stantec Consulting Services Inc., and Tetra Tech, Inc., dated June 23, 2025 | 8-K | 001-41436 | 96.1 | June 23, 2025 | |
97.1 | Ivanhoe Electric Inc. Clawback Policy | | | | | * |
99.1## | Collaboration and Exploration Agreement |
|
|
|
| * |
| 101.INS | Inline XBRL Instance Document – the instance document does not appear in the Interactive Data File because XBRL tags are embedded within the Inline XBRL document. | | | | | * |
| 101.SCH | Inline XBRL Taxonomy Extension Schema Document | | | | | * |
| 101.CAL | Inline XBRL Taxonomy Extension Calculation Linkbase Document | | | | | * |
| 101.DEF | Inline XBRL Taxonomy Extension Definition Linkbase Document | | | | | * |
| 101.LAB | Inline XBRL Taxonomy Extension Label Linkbase Document | | | | | * |
| 101.PRE | Inline XBRL Taxonomy Extension Presentation Linkbase Document | | | | | * |
| 104 | Cover Page Interactive Data File (embedded within the Inline XBRL document) | | | | | * |
+ The information contained in Exhibits 32.1 and 32.2 shall not be deemed “filed” for purposes of Section 18 of the Exchange Act of 1934, as amended, or the Exchange Act, or otherwise subject to the liabilities of that section, nor shall it be deemed incorporated by reference in any filing under the Securities Act or the Exchange Act (including this Annual Report on Form 10-K), unless the Registrant specifically incorporates the foregoing information into those documents by reference.
# Portions of this exhibit have been omitted because they are both (i) not material and (ii) would likely cause competitive harm to the Company if publicly disclosed.
## Certain schedules or portions thereof are omitted pursuant to Item 601(a)(5) of Regulation S-K. The Company agrees to provide on a supplemental basis a copy of any omitted schedule to the U.S. Securities and Exchange Commission or its staff upon request.
^ Certain schedules or portions thereof are omitted pursuant to Item 601(a)(6) of Regulation S-K. The Company agrees to provide on a supplemental basis a copy of any omitted schedule or portion to the U.S. Securities and Exchange Commission or its staff upon request.
= Indicates management contract or compensatory plan.
Item 16. Form 10-K Summary
None.
Signatures
Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, as amended, the Registrant has duly caused this Report to be signed on its behalf by the undersigned, thereunto duly authorized.
| | | | | | | | |
| | Ivanhoe Electric Inc. |
Date: February 23, 2026 | | /s/ Taylor Melvin |
| | Taylor Melvin |
| | Chief Executive Officer, President and Director |
Pursuant to the requirements of the Securities Exchange Act of 1934, as amended, this Report has been signed below by the following persons on behalf of the Registrant in the capacities and on the dates indicated.
| | | | | | | | | | | | | | |
| Signature | | Title | | Date |
| | | | |
/s/ Robert Friedland | | Executive Chairman of the Board of Directors | | February 21, 2026 |
| Robert Friedland | | | | |
| | | | |
/s/ Taylor Melvin | | Chief Executive Officer, President and Director | | February 23, 2026 |
| Taylor Melvin | | (Principal Executive Officer) | | |
| | | | |
/s/ Jordan Neeser | | Chief Financial Officer (Principal Financial Officer | | February 23, 2026 |
| Jordan Neeser | | and Principal Accounting Officer) | | |
| | | | |
/s/ Russell Ball | | Director | | February 20, 2026 |
| Russell Ball | | | | |
| | | | |
/s/ Sofia Bianchi | | Director | | February 20, 2026 |
Sofia Bianchi | | | | |
| | | | |
/s/ Victoire de Margerie | | Director | | February 20, 2026 |
| Victoire de Margerie | | | | |
| | | | |
/s/ Hirofumi Katase | | Director | | February 20, 2026 |
| Hirofumi Katase | | | | |
| | | | |
| /s/ Patrick Loftus-Hills | | Director | | February 20, 2026 |
| Patrick Loftus-Hills | | | | |
| | | | |
/s/ Priya Patil | | Director | | February 20, 2026 |
| Priya Patil | | | | |
| | | | |
| /s/ Ronald Vance | | Director | | February 21, 2026 |
| Ronald Vance | | | | |