STOCK TITAN

NexMetals: Selebi North indicated tonnage up 198%

Available on EDGAR Accepted by SEC EDGAR Learn about SEC filing dates
(Moderate)

Sentiment and the balance of points

Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.

Form Type
8-K

Rhea-AI Filing Summary

NexMetals Mining Corp. (NEXM) filed an independent NI 43-101 technical report supporting its 2026 mineral resource estimate for the past-producing Selebi Mines in Botswana. The report was prepared by The MSA Group and has an effective date of October 16, 2026.

The estimate includes 8.95 million tonnes of indicated resources at Selebi North, grading 1.03% copper, 1.08% nickel and 0.06% cobalt, and 41.95 million tonnes of inferred resources across Selebi Main and Selebi North, grading 1.45% copper, 1.01% nickel and 0.05% cobalt. The indicated tonnage is 198% above the 2024 estimate; combined inferred tonnage is 70% higher. The report says there are no material differences from the estimates announced in October 2026. No mineral reserves are reported, and the resource estimates have no demonstrated economic viability.

1 point · 0 major

How this balance works

Rhea-AI gives every point it takes from this document a weight. Minor counts 1, Moderate 3 and Major 9, so one Major point outweighs several Minor ones. The bar adds up the weights on each side, and when neither side holds more than 65% of the total the balance reads Mixed.

It reads the document as published, with the same rules for every company, and it does not look at what the market expected or at how the stock traded, so a point can be objectively good on a day the stock falls.

Rhea-AI Sentiment measures something else, the tone of the wording.

0 major · 0 points

How the balance works

Positive

  • Moderate pointSelebi North indicated tonnage rose 198%; combined inferred tonnage rose 70% versus 2024.

Negative

  • None.
Item 7.01 Regulation FD Disclosure Disclosure
Material non-public information disclosed under Regulation Fair Disclosure, often investor presentations or guidance.
Item 9.01 Financial Statements and Exhibits Exhibits
Financial statements, pro forma financial information, or exhibit attachments filed with this report.
Indicated resources, Selebi North 8.95 million tonnes 2026 MRE
Indicated-resource tonnage increase 198% Compared with the 2024 estimate at Selebi North
Inferred resources, Selebi Main and Selebi North 41.95 million tonnes Combined 2026 MRE
Combined inferred-tonnage increase 70% Compared with the 2024 combined estimate
Indicated copper grade 1.03% Selebi North
Indicated nickel grade 1.08% Selebi North
Inferred copper grade 1.45% Selebi Main and Selebi North combined
Inferred nickel grade 1.01% Selebi Main and Selebi North combined
NI 43-101 regulatory
"prepared in accordance with National Instrument 43-101"
A Canadian regulatory standard that sets the rules for how mining and exploration companies must report mineral resources and reserves, requiring technical reports prepared or signed off by an independent, certified expert. It matters to investors because it creates a consistent, transparent “inspection report” for mining projects, making it easier to compare prospects, judge the reliability of claims, and assess geological and financial risk before investing.
Indicated Mineral Resources technical
"Indicated Mineral Resources of 8.95 million tonnes"
Indicated mineral resources are quantities and qualities of a mineral deposit estimated with a reasonable level of confidence based on spaced sampling and analysis, sitting between a rough guess and a high-certainty measurement. For investors, they matter because they support preliminary economic studies and mine planning—think of them as a reasonably reliable shopping list for a recipe, useful for deciding whether to invest further but not yet proof that profitable extraction is guaranteed.
Inferred Mineral Resources technical
"Inferred Mineral Resources of 41.95 million tonnes"
An inferred mineral resource is an estimate of the quantity and grade of minerals in the ground based on limited sampling and geological information, where confidence is low and continuity is uncertain. For investors it signals potential value but also higher risk—like a rough sketch of a hidden treasure that requires much more exploration and testing before you can reliably judge its size or economic worth.
Mineral Reserves technical
"There are no Mineral Reserves."
Mineral reserves are the amounts of a metal or mineral that a company has identified and can legally and economically extract with current technology. Think of it like the usable fuel in a car’s tank rather than all the oil in the ground; reserves determine how long a mine can produce, help estimate future revenue and costs, and shape a company’s value and investment risk.
Net Smelter Return technical
"US$75/t NSR (Net Smelter Return)"
Net smelter return is the percentage of revenue from selling a mineral or metal that a mining company or project owner receives after deducting costs like refining and transportation. It functions like a share of the profits from the mineral's sale, giving investors an idea of how much money the project generates. This measure helps investors assess the potential profitability of a mining asset.
CuEq technical
"Total (Mlbs CuEq)"
CuEq (copper equivalent) converts the value of multiple metals in a mineral deposit into the amount of copper that would have the same value, producing a single, comparable grade number. For investors it acts like converting different currencies into one money — simplifying comparison of deposits and potential revenue, but its accuracy depends on the metal prices, recovery rates and cost assumptions used to make the conversion, so detailed reports are still needed.

FAQ

AI-generated questions and answers. How Rhea-AI works. Not financial advice.

What mineral resources does NEXM report at Selebi?

NEXM reports 8.95 million tonnes of indicated resources at Selebi North, grading 1.03% copper, 1.08% nickel and 0.06% cobalt. It reports 41.95 million tonnes of inferred resources across Selebi Main and Selebi North, grading 1.45% copper, 1.01% nickel and 0.05% cobalt.

What cutoff assumptions does NEXM use for its Selebi resource estimate?

The resource estimate uses a US$75 per tonne net smelter return cutoff and a minimum thickness of 1.5 metres. Long-term prices used are US$9.10 per pound for nickel, US$5.10 per pound for copper and US$20.00 per pound for cobalt.

Does NEXM report mineral reserves at Selebi?

No mineral reserves are reported. NexMetals states that mineral resources have no demonstrated economic viability and that there is no guarantee any part will be converted into a mineral reserve.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google
false 0000795800 0000795800 2026-11-16 2026-11-16 iso4217:USD xbrli:shares iso4217:USD xbrli:shares

 

 

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

FORM 8-K

 

CURRENT REPORT

Pursuant to Section 13 OR 15(d) of the Securities Exchange Act of 1934

 

Date of Report (Date of earliest event reported): November 16, 2026

 

NEXMETALS MINING CORP.

(Exact name of registrant as specified in its charter)

 

British Columbia, Canada

(State or other jurisdiction of incorporation)

 

001-42750   N/A
(Commission File Number)   (IRS Employer Identification No.)
     

1600-1021 West Hastings Street,

Vancouver, British Columbia, Canada

  V6E 0C3
(Address of principal executive offices)   (Zip Code)

 

(866) 794-6396

(Registrant’s telephone number, including area code)

 

N/A

(Former name or former address, if changed since last report)

 

Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions (see General Instruction A.2. below):

 

  ☐ Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)
     
  ☐ Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)
     
  ☐ Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))
     
  ☐ Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))

 

Securities registered pursuant to Section 12(b) of the Act:

 

Title of each class   Trading Symbol(s)   Name of each exchange on which registered
Common Shares, no par value   NEXM   Nasdaq Stock Market LLC (Nasdaq Capital Market)

 

Indicate by check mark whether the registrant is an emerging growth company as defined in Rule 405 of the Securities Act of 1933 (§230.405 of this chapter) or Rule 12b-2 of the Securities Exchange Act of 1934 (§240.12b-2 of this chapter).

 

Emerging growth company ☐

 

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐

 

 

 

 
 

 

Item 7.01Regulation FD Disclosure.

 

On November 16, 2026, NexMetals Mining Corp. (the “Company”) issued a news release announcing that it has filed an independent technical report prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects, supporting the 2026 Mineral Resource Estimate for its past-producing Selebi Mines in Botswana. A copy of this press release is attached as Exhibit 99.1 hereto and is incorporated herein by reference. The Company undertakes no obligation to update, supplement or amend the materials attached hereto as Exhibit 99.1.

 

Cautionary Statements to Investors on Reserves and Resources

 

The news release furnished herewith uses the terms “mineral resources”, “indicated mineral resources” and “inferred mineral resources” as such terms are defined under Canadian National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”). NI 43-101 is a rule developed by the Canadian Securities Administrators, which establishes standards for all public disclosure a Canadian issuer makes of scientific and technical information concerning mineral projects.

 

On October 31, 2018, the SEC adopted new mining disclosure rules (“S-K 1300”) that are more closely aligned with current industry and global regulatory practices and standards, including NI 43-101, with which we comply because we are also a “reporting issuer” under Canadian securities laws. While S-K 1300 is more closely aligned with NI 43-101 than the prior mining disclosure rules of the Securities and Exchange Commission, there are some differences. Accordingly, there is no assurance any mineral resources that the Company may report as “indicated mineral resources” and “inferred mineral resources” under NI 43-101 will be the same as the reserve or resource estimates prepared under S-K 1300. Investors should not assume that any part or all of indicated mineral resources or inferred mineral resources will ever be converted into a higher category of mineral resources or into mineral reserves. Mineralization described using these terms has a greater amount of uncertainty as to their existence and feasibility than mineralization that has been characterized as reserves. Accordingly, investors are cautioned not to assume that any “indicated mineral resources”, or “inferred mineral resources” on the Company’s projects are or will be economically or legally mineable. Further, “inferred resources” have a greater amount of uncertainty as to their existence and as to whether they can be mined legally or economically. Therefore, investors are also cautioned not to assume that all or any part of the inferred resources exist. In accordance with Canadian rules, estimates of “inferred mineral resources” cannot form the basis of feasibility or other economic studies, except in limited circumstances where permitted under NI 43-101.

 

The information in this Current Report on Form 8-K (including Exhibit 99.1 attached hereto) is being furnished and shall not be deemed to be filed for purposes of Section 18 of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), or otherwise be subject to the liabilities of that section, nor shall it be deemed to be incorporated by reference in any filing under the Securities Act of 1933, as amended, or the Exchange Act, whether made before or after the date hereof and regardless of any general incorporation language in such filing.

 

Item 9.01Financial Statements and Exhibits.

 

(d) Exhibits

 

Exhibit No.   Description
99.1   Press Release dated November 16, 2026.
104   Cover Page Interactive Data File (embedded within Inline XBRL document).

 

 
 

 

SIGNATURES

 

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.

 

 

NEXMETALS MINING CORP.

(Registrant)

   
  By: /s/ Brett MacKay
    Brett MacKay
    Chief Financial Officer
     
Date: November 16, 2026    

 

 

 

Exhibit 99.1

 

 

NexMetals Files NI 43-101 Technical Report supporting the

 

2026 Selebi Mines Mineral Resource Estimate

 

Vancouver, British Columbia, November 16, 2026 – NexMetals Mining Corp. (TSXV: NEXM) (Nasdaq: NEXM) (the “Company” or “NEXM”) is pleased to announce that it has filed an independent technical report prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”), supporting the 2026 Mineral Resource Estimate (the “2026 MRE”) for its past-producing Selebi Mines in Botswana. The 2026 MRE comprises the estimates for the Selebi Main and Selebi North copper-nickel-cobalt deposits, announced on October 1, 2026 and October 20, 2026, respectively.

 

The 2026 MRE includes Indicated Mineral Resources of 8.95 million tonnes grading 1.03% copper, 1.08% nickel and 0.06% cobalt at Selebi North, representing a 198% increase in tonnage over the 2024 estimate, and Inferred Mineral Resources of 41.95 million tonnes grading 1.45% copper, 1.01% nickel and 0.05% cobalt across Selebi Main and Selebi North, representing a 70% increase in combined tonnage over the 2024 estimate.

 

The technical report, entitled “NI 43-101 Technical Report – October 2026 Mineral Resource Estimate, Selebi Mines Copper-Nickel-Cobalt Project, Botswana”, was prepared by The MSA Group (Pty) Ltd. (“MSA”) with an effective date of October 16, 2026. The technical report has been filed under the Company’s profile on SEDAR+ at www.sedarplus.ca, furnished under the Company’s profile on EDGAR at www.sec.gov and is also available on the Company’s website. The Company has also filed a related Regulation S-K 1300-compliant technical report summary as an exhibit to its Quarterly Report on Form 10-Q for the period ended September 30, 2026. There are no material differences between the technical report and the 2026 MRE as previously disclosed in the Company’s news releases dated October 1, 2026, and October 20, 2026.

 

Table 1. 2026 MRE Summary

 

        Tonnage   Grade   Contained Metal
Classification   Deposit   (Mt)   Cu (%)  

Ni (%)

 

Co (%)

 

Cu (Mlbs)

 

Ni (Mlbs)

 

Co (Mlbs)

 

Total (Mlbs CuEq)

Indicated   Selebi North   8.95   1.03   1.08   0.06   204   214   11   412
  Total   8.95   1.03   1.08   0.06   204   214   11   412

Inferred

 

Selebi Main

Upper Zone

  23.52   1.61   1.05   0.05   834   546   28   1,365
 

Selebi Main

Lower Zone

  8.95   1.31   0.77   0.04   259   153   8   407
  Selebi North   9.48   1.21   1.13   0.06   253   236   12   483
  Total   41.95   1.45   1.01   0.05   1,345   935   48   2,255

 

1.All tabulated data have been rounded and as a result minor computational errors may occur.
2.Mineral Resources, which are not Mineral Reserves, have no demonstrated economic viability. There is no guarantee that all or any part of the Mineral Resource will be converted into a Mineral Reserve. The estimate of Mineral Resources may be materially affected by geology, environment, permitting, legal title, taxation, socio-political, marketing, or other relevant issues.

 

1
 

 

3.Mt = Million tonnes, Mlbs = million pounds, CuEq = copper equivalent
4.The 2026 MRE has been prepared in accordance with the CIM Definition Standards (2014) and CIM Best Practice Guidelines (2019) with effective dates of September 28, 2026 for Selebi Main and October 16, 2026 for Selebi North.
5.Mineral Resources are reported at a cut-off value of US$75/t NSR (Net Smelter Return), defined as received value of final metal recovered minus off-site costs, and a minimum thickness of 1.5 metres. Block model estimates of less than US$75/t NSR are included within the Mineral Resource in areas where it was considered not feasible to mine selectively around them. Areas of the block model were excluded in low grade areas where there is no potential to define a mineable block above US$75/t NSR.
6.Mineral Resources are estimated using long-term prices of US$9.10/lb Ni, US$5.10/lb Cu, US$20.00/lb Co. The same metal prices were used in NSR calculations.
7.Mineral Resources are estimated using nickel, copper and cobalt recoveries of 55.6%, 96.1%, and 60.2%, respectively, derived from metallurgical studies which consider a two-concentrate scenario.
8.Payabilities and off-site treatment and refining costs were derived from an independent marketing study commissioned by NEXM.
9.Bulk density has been estimated in the block model based on an extensive data set of measurements taken from drillhole cores. The average density for the mineralized zone is 3.47 t/m3 for Selebi Main and 3.65 t/m3 for Selebi North.
10.Mineral Resources are reported using NSR values which assume mining costs of US$47.60/tonne, concentrate processing costs of US$20.00/tonne and G&A of US$5.50/tonne.
11.Areas depleted or sterilized by mining were removed from the Mineral Resource.
12.There are no Mineral Reserves.
13.Copper equivalent is calculated using the formula CuEq =(Cu%*96.4+Ni%*87.0+Co%*132.7)/96.4.

 

Qualified Persons

 

Mr. J.C. Witley (BSc Hons, MSc (Eng.)) is a geologist with more than 35 years’ experience in base and precious metals exploration and mining as well as Mineral Resource evaluation and reporting. He is Head of Mineral Resources for The MSA Group (an independent consulting company), is registered as Pr.Sci.Nat. with the South African Council for Natural Scientific Professions (SACNASP) and is a Fellow of the Geological Society of South Africa (GSSA). Mr. Witley has the appropriate relevant qualifications and experience to be considered a “Qualified Person” for the style and type of mineralization and activity being undertaken as defined in NI 43-101 and is considered independent of NEXM pursuant to NI 43-101. Mr. Witley has reviewed and approved the technical and scientific information within this news release pertaining to the 2026 MRE.

 

Verification by Mr. Witley included a site visit to inspect historical mineralized core, observe existing infrastructure on surface and underground, examine mineralization in underground drives, and verify several surface drillhole collar locations (both historical and recent). The mineralization in 23 NEXM holes was inspected by the QP together with the sample assay results to verify the magnitude of the mineralization copper and nickel grades. In addition, a selection of samples collected by NEXM has been verified against independently accessed assay certificates, and a random selection of historical database results has been compared against digital records.

 

The scientific and technical content of this news release has been reviewed and approved by Sharon Taylor, V.P. Geophysics of the Company, MSc, P.Geo, who is a “qualified person” for the purposes of NI 43-101.

 

About NexMetals Mining Corp.

 

NexMetals Mining Corp. is a TSX.V and NASDAQ listed mineral exploration and development company focused on redeveloping the past-producing Selebi copper-nickel-cobalt mines in Botswana and the Selkirk copper-nickel-cobalt-platinum group element mine in Botswana. At Selebi, the Company has confirmed the scale of mineralization is larger than historical estimates, supported by NI 43-101- and Regulation S-K 1300-compliant resource estimates, with ongoing down-hole geophysics, drilling, and metallurgical programs aimed at expanding resources and supporting future economic studies. The Company is led by an experienced management and technical team with a proven track record in global mineral projects, emphasizing disciplined execution, transparent governance, and long-term stakeholder value creation.

 

2
 

 

For further information about NexMetals Mining Corp., please contact:

 

Sean Whiteford

CEO

info@nexmetalsmining.com

1-866-794-NEXM (6396)

 

Follow Us

 

X: https://x.com/NexMetalsCorp

LinkedIn: https://www.linkedin.com/company/NexMetalsMiningCorp

Facebook: https://www.facebook.com/NexMetalsMiningCorp

 

Neither the TSX Venture Exchange and its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) nor the Nasdaq Stock Market LLC accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

 

Cautionary Note Regarding Forward-Looking Statements

 

This news release contains “forward-looking statements” within the meaning of the United States federal securities laws and “forward-looking information” within the meaning of applicable Canadian securities legislation (collectively, “forward-looking information”) based on expectations, estimates and projections as at the date of this news release. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. For the purposes of this release, forward-looking information includes, but is not limited to, the 2026 MRE; and the Company’s planned exploration, drilling, geophysical and metallurgical programs and future economic studies. These forward-looking statements, by their nature, require the Company to make certain assumptions and necessarily involve known and unknown risks and uncertainties that could cause actual results to differ materially from those expressed or implied in these forward-looking statements. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, the risk that any of the assumptions underlying the 2026 MRE materially vary or prove to be incorrect, capital and operating costs varying significantly from estimates; the preliminary nature of drilling and metallurgical test results; payabilities of metals varying from expectations; the ability of exploration results to predict mineralization; the risk that the Company will not be able to expand or enhance its current mineral resource estimates; the ability of the Company to implement its drilling, geoscience and metallurgical work on its properties and work plans generally; the results of any prefeasibility or feasibility study and the feasibility of mine production; delays in obtaining or failures to obtain required governmental, environmental or other project approvals; uncertainties relating to the availability and costs of financing needed in the future, including the Company’s ability to obtain financing before the end of 2026 which is needed to advance the projects; changes in equity markets; inflation; fluctuations in commodity prices; delays in the development of projects; the other risks involved in the mineral exploration and development industry; and those risks set out in the Company’s filings with the SEC on EDGAR (www.sec.gov) and public disclosure record on SEDAR+ (www.sedarplus.ca), in each case, under the Company’s issuer profile. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

 

3

Filing Exhibits & Attachments

5 documents

Keep reading