STOCK TITAN

High-grade Lotto assays for New Found Gold (NYSE American: NFGC)

(Neutral)
(Neutral)
Form Type
6-K

Rhea-AI Filing Summary

New Found Gold Corp. reports new channel sample and infill drill results from the Lotto Zone at its 100%-owned Queensway Project in Newfoundland and Labrador. Highlights include 23.66 g/t gold over 15.88 m from channel LT-25-01-27 at surface and 43.52 g/t gold over 4.75 m from underground hole NFGC-25-2661, with additional multi-gram intercepts.

The Lotto excavation exposed gold-bearing quartz veins over a 210 by 70 m area beneath shallow overburden, enabling 729 m of channel sampling across 57 lines and seven infill drill holes totalling 1,928 m. Results are described as consistent with the existing mineral resource block model and will inform future mineral resource estimates and mine planning. New Found Gold notes a 2025 Queensway drill program of 74,377 m in 614 holes, an expanded 2026 program targeting 90,000 m with 40,100 m completed to date, and plans to file an updated Technical Report with an updated mineral resource estimate in the second half of 2026 while advancing Queensway and Hammerdown toward production.

Positive

  • None.

Negative

  • None.

Filing Explained

Lotto results refine the geological model, but resource-category conversion remains incomplete pending additional infill drilling planned for the second half of 2026.

As a Form 6-K, this July 21, 2026 filing is an interim report furnishing material home-market information; it reports completed Lotto channel sampling and infill drilling results, while the related resource-category conversion work remains unfinished.

The company says the channel-mapping results are not expected to significantly affect the future mineral resource estimate, while the drilling results will be incorporated into the next estimate. The disclosure therefore adds data for future geological and resource modeling rather than reporting a changed resource estimate.

Additional infill drilling is required to complete the conversion of parts of the Lotto block model from inferred to indicated, and that work is planned for the second half of 2026. The company also plans an updated Queensway Technical Report, including an updated mineral resource estimate, later in the second half of 2026.

Lotto channel LT-25-01-27 23.66 g/t Au over 15.88 m Channel sampling highlight from Lotto excavation
Lotto drill hole NFGC-25-2661 43.52 g/t Au over 4.75 m Underground infill drilling highlight in Lotto Main zone
Lotto drill hole NFGC-25-2680 22.29 g/t Au over 3.60 m Additional underground infill highlight in Lotto Main zone
Lotto excavation footprint 210 by 70 m Area of exposed mineralized bedrock beneath 2.5–9 m of overburden
Channel sampling completed at Lotto 729 m Channel length from 57 lines at 7.5 m spacing
Lotto infill drilling reported 1,928 m Seven diamond drill holes included in current results
2025 Queensway drilling 74,377 m in 614 DDH Total metres and hole count in 2025 drill program
2026 Queensway drill program 90,000 m (40,100 m completed) Planned and completed metres in 284 holes to date in 2026
PhotonAssay™ technical
"submitted samples for gold determination by PhotonAssay™ to ALS Canada Ltd."
Photonassay™ is a laboratory testing method that uses high-energy light particles (photons) to measure the concentrations of metals and other elements in rock, soil or drill-core samples. For investors it matters because it can deliver faster, higher-volume and often non-destructive results than traditional sampling, helping companies define mineral resources and production potential more quickly—think of it like an X-ray scanner that reveals how much of a valuable ingredient is inside a loaf of bread.
Preliminary Economic Assessment financial
"as outlined in the 2025 Preliminary Economic Assessment in relation to the Phase 2 and Phase 3 development"
A preliminary economic assessment is an initial analysis that estimates the potential profitability and feasibility of a project or resource, such as a new mineral deposit or development venture. It provides a rough idea of costs, benefits, and risks, helping investors decide whether to pursue more detailed studies. This early evaluation is important because it offers a snapshot of whether the project is worth further investment and development.
inferred mineral resource blocks financial
"infill drill results of Phase 2 open pit and underground inferred mineral resource blocks from the Lotto Zone"
Qualified Person regulatory
"reviewed and approved by Melissa Render, P. Geo., President, and a Qualified Person as defined"
A qualified person is someone with specialized knowledge, experience, and training in a particular field, allowing them to accurately assess and verify information or work. Their expertise helps ensure that reports, evaluations, or decisions are trustworthy and meet required standards. For investors, a qualified person provides confidence that the information they rely on is credible and properly validated.
National Instrument 43-101 regulatory
"a Qualified Person as defined under National Instrument 43-101"
National Instrument 43-101 is a set of rules and guidelines that govern how mineral exploration and mining companies must report information about their projects. It ensures that the details shared with investors are accurate, consistent, and reliable—similar to how a detailed, verified blueprint ensures a building’s safety. This helps investors make informed decisions based on trustworthy information about a company's mineral resources.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google
Learn about SEC filing dates

FAQ

What Lotto Zone results did New Found Gold (NFGC) announce in this 6-K?

New Found Gold reported 23.66 g/t Au over 15.88 m from channel LT-25-01-27 and 43.52 g/t Au over 4.75 m from hole NFGC-25-2661 at the Lotto Zone, plus several additional multi-gram gold intercepts in channels and infill drilling.

How extensive were the Lotto excavation and channel sampling for New Found Gold (NFGC)?

At Lotto, shallow overburden was stripped to expose bedrock over a 210 by 70 m area. The company collected 729 m of channel samples from 57 lines spaced 7.5 m apart, providing detailed surface data for geological and resource modelling.

What drilling has New Found Gold (NFGC) completed at Queensway in 2025 and 2026?

In 2025, the Queensway program totalled 74,377 m in 614 diamond drill holes. For 2026, an expanded program targets 90,000 m of drilling focused on discovery and resource growth, with about 40,100 m completed in 284 holes to date.

How will the Lotto results affect New Found Gold (NFGC)'s resource modelling and mine planning?

The Lotto channel and infill drill data are described as consistent with the existing mineral resource block model and will feed into future mineral resource estimates and mine planning, including an updated Technical Report with an updated MRE planned for H2 2026.

What are New Found Gold (NFGC)'s broader development and listing plans?

New Found Gold aims to bring the Hammerdown deposit into commercial production in H2 2026 and advance Queensway toward Phase I production. The company also received conditional approval to graduate to the Toronto Stock Exchange, reserving the symbol NFGC.

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C.  20549

Form 6-K

REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16 UNDER THE
SECURITIES EXCHANGE ACT OF 1934

For the month of July 2026

Commission File Number: 001-39966

New Found Gold Corp.

(Exact name of registrant as specified in its charter)

 

1133 Melville Street, Suite 3500, The Stack

Vancouver, British Columbia
V6E 4E5 Canada

(Address of principal executive office)

Indicate by check mark whether the registrant files or will file annual reports under cover Form 20-F or 40-F:

Form 20-F ☐    Form 40-F ☒


SUBMITTED HEREWITH

Exhibit Description
  
99.1   News Release dated July 21, 2026


SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on behalf by the undersigned, thereunto duly authorized.

  NEW FOUND GOLD CORP.
  (Registrant)
     
Date: July 21, 2026 By: /s/ Keith Boyle
    Keith Boyle
    Chief Executive Officer



New Found Gold Continues to Deliver High-Grade Gold at Queensway

23.7 g/t Au over 15.88 m from Lotto Channels

43.5 g/t Au over 4.75 m from Lotto Underground Infill Drilling

Vancouver, BC, July 21, 2026 - New Found Gold Corp. ("New Found Gold" or the "Company") (TSX-V: NFG, NYSE-A: NFGC) is pleased to announce channel sample and infill drill results of Phase 2 open pit and underground inferred mineral resource blocks from the Lotto Zone ("Lotto" or the "Zone") on its 100%-owned Queensway Gold Project ("Queensway" or the "Project") in Newfoundland and Labrador ("NL"), Canada.

Lotto channel sample highlights include:

  • 23.7 g/t Au over 15.88 m from 11.62 m (LT-25-01-27)

  • 3.38 g/t Au over 9.07 m from 15.80 m (LT-25-01-28)

  • 2.17 g/t Au over 16.36 m from 8.26 m (LT-25-01-30)

  • 3.22 g/t Au over 12.83 m from 4.58 m (LT-25-01-31)

Lotto underground infill drilling highlights include:

  • 43.5 g/t Au over 4.75 m from 298.45 m (NFGC-25-2661)
  • 22.3 g/t Au over 3.60 m from 282.10 m (NFGC-25-2680)

"I am pleased to report that both channel sampling and drilling at Lotto have returned high grades over good widths, consistent with the MRE block model," stated Melissa Render, President of New Found Gold. "Queensway is an orogenic, structurally controlled gold system that comes to within a few metres of surface, allowing us to systematically derisk the Project through both drilling and the excavation of key zones. The excavations expose high-grade gold mineralization at surface which can then be mapped and channel sampled. We began our excavation program at the Keats and Iceberg zones, and more recently extended it to Lotto, as a cost-effective method of continuing to refine and derisk our mine plan and geological model as we advance towards near-term production at Queensway.

Work Summary and Results

Lotto is located in the AFZ Core area ("AFZC"), approximately 1.6 kilometres ("km") north of the Keats and Iceberg zones (Figure 1). In 2025, the shallow overburden over Lotto was excavated to expose the mineralized bedrock over a 210 by 70 metre ("m") area for geological mapping and channel sampling. This press release reports results from both the channel sampling of the Lotto excavation and infill drilling of Phase 2 open pit and underground inferred mineral resource blocks to support mine planning completed in 2025, as outlined in the 2025 Preliminary Economic Assessment ("PEA") in relation to the Phase 2 and Phase 3 development (see the New Found Gold press release dated July 21, 2025).


Results are reported for 729 m of channel samples ("Channels") collected from 57 lines spaced at 7.5 m intervals and completed in H2/25 at the Lotto excavation. Results from seven diamond drill holes ("DDH"), totalling 1,928 m, are also presented herein. Drill highlights, along with full channel and DDH details for the results included in this press release, are provided in Tables 1 to 3.

Figure 1: Plan view map of Queensway North with location of Lotto in the AFZC.

Channels

The excavation at Lotto met its objective in successfully exposing a network of gold-bearing quartz veins over a strike length of 210 m directly below 2.5 to 9 m of overburden, allowing for detailed geological and structural mapping to inform the geological and resource models to increase confidence in resource areas that form a portion of the Phase 1 mine plan outlined in the Queensway PEA.


Sampling at 7.5 m spacing across the bedrock surface has provided valuable detailed information to inform the geological model on the gold grade variability across the top of the Zone, with the data expected to be incorporated into future mineral resource estimates ('MRE') for Queensway.

The results of the Channels and mapping validated the overarching modeling of the mineralized trends and key veins, while providing an additional level of data to inform the established geological and resource model. Secondary veins not well represented by the drilling were exposed in the excavation and may provide opportunities for further testing and expansion. Overall, the results of the Channels and mapping are not expected to significantly impact the future MRE and demonstrated the local variability characteristic of a coarse, free-gold quartz vein system.

DDH

Lotto infill drilling from 2025 was completed as part of a broader geotechnical program targeting the Phase 2 open pit and Phase 3 underground as defined in the PEA, while also serving as infill to support the conversion of open pit and underground areas of the block model from the inferred to the indicated category. Additional infill drilling is required to complete the conversion program at Lotto and is planned for H2/26.

Results from the DDH reported in this release conform well with the initial MRE block model, with expected localized variability. These results will be incorporated into the next MRE update.


Figure 2: Plan view map of Lotto with Channel highlights.

Table 1: Drill and Channel Result Highlights.

LOTTO

Hole No. From (m) To (m) Interval (m) Au (g/t) True
Width (%)
Zone
NFGC-25-2661 298.45 303.20 4.75 43.52 50-80 Lotto Main
Including 299.20 301.20 2.00 97.44 50-80
NFGC-25-2680 282.10 285.70 3.60 22.29 70-95 Lotto Main
Including 282.45 283.15 0.70 13.76 70-95
Including 283.90 284.90 1.00 68.95 70-95

LOTTO EXCAVATION

Hole No. From (m) To (m) Interval (m) Au (g/t) True
Width (%)
Zone
LT-25-01-27 11.62 27.50 15.88 23.66 85-100 Lotto Excavation
Including 21.78 23.89 2.11 164.69 85-100
LT-25-01-28 15.80 24.87 9.07 3.38 85-100 Lotto Excavation
Including 16.57 16.98 0.41 32.33 85-100
LT-25-01-30 8.26 24.62 16.36 2.17 85-100 Lotto Excavation
Including 14.63 15.46 0.83 16.53 85-100
LT-25-01-31 4.58 17.41 12.83 3.22 80-100 Lotto Excavation
Including 4.58 6.12 1.54 17.09 80-100
Including 16.84 17.41 0.57 10.33 85-100

Note that the host structures are interpreted to be moderately to steeply dipping. Infill veining in secondary structures with multiple orientations crosscutting the primary host structures are commonly observed in drill core and channel which could result in additional uncertainty in true width. Composite intervals reported carry a minimum weighted average of 1 g/t Au diluted over a minimum core or channel length of 2 m with a maximum of 4 m consecutive dilution when above 200 m vertical depth and 2 m consecutive dilution when below 200 m vertical depth. Included high-grade intercepts are reported as any consecutive interval with grades greater than 10 g/t Au. Grades have not been capped in the averaging and intervals are reported as drill or channel length thickness. Details of all drill holes and channels reported in this release are included in Table 2 and Table 3 below.


Figure 3: Inclined view of Lotto (looking north) with DDH highlights.


Figure 4: Exposed gold-bearing veins in the Lotto Excavation.

Looking Ahead

The 2025 Queensway drill program included 74,377 m of drilling in 614 diamond DDH, with approximately 75% of the drilling focused on the AFZ Core area to support advancement of the Phase 1 mine plan, as outlined in the Company's PEA, and 25% focused on exploration targets such as Dropkick. To date, approximately 6% of the results from 2025 drilling remain outstanding. These results will be reported once available.


On June 2, 2026 the Company announced an expanded 2026 Queensway work program which includes 90,000 m of drilling with a focus on discovery and resource growth (see the New Found Gold press release dated June 2, 2026). To date approximately 40,100 m have been completed in 284 DDH.

The Company plans to file an updated Technical Report for Queensway later in H2/26 which will include an updated MRE.

Table 2: Summary of composite drill hole and channel results reported in this news release.

LOTTO

Hole/Channel No.

From (m)

To (m)

Interval (m)

Au (g/t)

True Width (%)

Zone

NFGC-25-2631

155.00

157.15

2.15

1.22

10-40

Lotto Main

And

174.75

177.05

2.30

3.58

70-95

Including

176.20

176.55

0.35

18.29

70-95

NFGC-25-2639

No Significant Values

Lotto Main

NFGC-25-2646

134.00

139.55

5.55

3.17

Unknown

Lotto Main

NFGC-25-2652

300.00

302.00

2.00

1.03

70-95

Lotto Main

And

307.30

311.05

3.75

1.81

70-95

NFGC-25-2661

298.45

303.20

4.75

43.52

50-80

Lotto Main

Including

299.20

301.20

2.00

97.44

50-80

NFGC-25-2672

No Significant Values

Lotto Main

NFGC-25-2680

282.10

285.70

3.60

22.29

70-95

Lotto Main

Including

282.45

283.15

0.70

13.76

70-95

Including

283.90

284.90

1.00

68.95

70-95

LOTTO EXCAVATION

Hole No.

From (m)

To (m)

Interval (m)

Au (g/t)

True Width (%)

Zone

LT-25-01-01

No Significant Values

Lotto Excavation

LT-25-01-02

No Significant Values

Lotto Excavation

LT-25-01-03

No Significant Values

Lotto Excavation

LT-25-01-04

No Significant Values

Lotto Excavation

LT-25-01-05

No Significant Values

Lotto Excavation

LT-25-01-06

No Significant Values

Lotto Excavation

LT-25-01-07

No Significant Values

Lotto Excavation

LT-25-01-08

No Significant Values

Lotto Excavation

LT-25-01-09

No Significant Values

Lotto Excavation

LT-25-01-10

No Significant Values

Lotto Excavation

LT-25-01-11

No Significant Values

Lotto Excavation

LT-25-01-12

No Significant Values

Lotto Excavation

LT-25-01-13

No Significant Values

Lotto Excavation

LT-25-01-14

No Significant Values

Lotto Excavation

LT-25-01-15

No Significant Values

Lotto Excavation

LT-25-01-16

8.76

12.79

4.03

1.21

75-95

Lotto Excavation

LT-25-01-17

No Significant Values

Lotto Excavation

LT-25-01-18

No Significant Values

Lotto Excavation

LT-25-01-19

No Significant Values

Lotto Excavation

LT-25-01-20

No Significant Values

Lotto Excavation




LT-25-01-21

No Significant Values

Lotto Excavation

LT-25-01-22

No Significant Values

Lotto Excavation

LT-25-01-23

No Significant Values

Lotto Excavation

LT-25-01-24

32.38

34.75

2.37

1.61

65-85

Lotto Excavation

LT-25-01-25

16.95

22.54

5.59

2.18

55-75

Lotto Excavation

LT-25-01-26

25.81

30.77

4.96

1.74

65-85

Lotto Excavation

LT-25-01-27

11.62

27.50

15.88

23.66

85-100

Lotto Excavation

Including

21.78

23.89

2.11

164.69

85-100

LT-25-01-28

15.80

24.87

9.07

3.38

85-100

Lotto Excavation

Including

16.57

16.98

0.41

32.33

85-100

LT-25-01-29

8.01

12.80

4.79

2.37

70-90

Lotto Excavation

Including

10.81

11.20

0.39

12.58

70-90

LT-25-01-30

2.00

4.38

2.38

2.04

65-85

Lotto Excavation

And

8.26

24.62

16.36

2.17

85-100

Including

14.63

15.46

0.83

16.53

85-100

LT-25-01-31

4.58

17.41

12.83

3.22

80-100

Lotto Excavation

Including

4.58

6.12

1.54

17.09

80-100

Including

16.84

17.41

0.57

10.33

85-100

LT-25-01-32

16.10

18.31

2.21

1.01

85-100

Lotto Excavation

LT-25-01-33

No Significant Values

Lotto Excavation

LT-25-01-34

1.63

4.20

2.57

1.75

80-100

Lotto Excavation

And

7.60

10.01

2.41

1.53

80-100

LT-25-01-35

3.87

7.22

3.35

3.17

75-95

Lotto Excavation

LT-25-01-38

No Significant Values

Lotto Excavation

LT-25-01-39

4.85

7.64

2.79

1.17

85-100

Lotto Excavation

LT-25-01-40

No Significant Values

Lotto Excavation

LT-25-01-41

No Significant Values

Lotto Excavation

LT-25-01-42

1.09

3.44

2.35

7.98

80-100

Lotto Excavation

Including

2.29

2.89

0.60

30.06

80-100

LT-25-01-43

2.23

8.54

6.31

2.84

85-100

Lotto Excavation

LT-25-01-44

1.45

4.05

2.60

1.26

85-100

Lotto Excavation

And

9.83

12.14

2.31

1.56

85-100

LT-25-01-45

0.74

2.97

2.23

1.08

85-100

Lotto Excavation

LT-25-01-46

No Significant Values

Lotto Excavation

LT-25-01-47

No Significant Values

Lotto Excavation

LT-25-01-48

No Significant Values

Lotto Excavation

LT-25-01-49

No Significant Values

Lotto Excavation

LT-25-01-50

No Significant Values

Lotto Excavation

LT-25-01-51

No Significant Values

Lotto Excavation

LT-25-01-52

No Significant Values

Lotto Excavation

LT-25-01-53

No Significant Values

Lotto Excavation

LT-25-01-54

No Significant Values

Lotto Excavation

LT-25-01-55

No Significant Values

Lotto Excavation

LT-25-01-56

No Significant Values

Lotto Excavation

LT-25-01-57

0.00

3.18

3.18

1.98

80-100

Lotto Excavation

Note that the host structures are interpreted to be moderately to steeply dipping. Infill veining in secondary structures with multiple orientations crosscutting the primary host structures are commonly observed in drill core and channel which could result in additional uncertainty in true width. Composite intervals reported carry a minimum weighted average of 1 g/t Au diluted over a minimum core or channel length of 2 m with a maximum of 4 m consecutive dilution when above 200 m vertical depth and 2 m consecutive dilution when below 200 m vertical depth. Included high-grade intercepts are reported as any consecutive interval with grades greater than 10 g/t Au. Grades have not been capped in the averaging and intervals are reported as drill or channel length thickness.


Table 3: Details of drill holes reported in this news release.

Hole /Channel No. Length (m) Azimuth (°) Dip (°) UTM E UTM N Prospect
LT-25-01-01 2.76 52 3 658885 5429104 Lotto Excavation
LT-25-01-02 5.93 50 1 658903 5429120 Lotto Excavation
LT-25-01-03 2.46 50 0 658890 5429099 Lotto Excavation
LT-25-01-04 4.32 51 -1 658907 5429113 Lotto Excavation
LT-25-01-05 2.49 50 -3 658894 5429092 Lotto Excavation
LT-25-01-06 4.80 51 -23 658911 5429106 Lotto Excavation
LT-25-01-07 6.86 50 0 658899 5429087 Lotto Excavation
LT-25-01-08 7.38 51 -13 658915 5429100 Lotto Excavation
LT-25-01-09 2.62 49 -4 658904 5429081 Lotto Excavation
LT-25-01-10 5.53 51 17 658908 5429085 Lotto Excavation
LT-25-01-11 6.48 50 -4 658918 5429093 Lotto Excavation
LT-25-01-12 9.35 50 -10 658905 5429072 Lotto Excavation
LT-25-01-13 4.95 50 -4 658916 5429082 Lotto Excavation
LT-25-01-14 5.04 50 4 658923 5429087 Lotto Excavation
LT-25-01-15 18.62 50 1 658915 5429071 Lotto Excavation
LT-25-01-16 15.90 50 -5 658921 5429066 Lotto Excavation
LT-25-01-17 7.84 120 -15 658872 5429041 Lotto Excavation
LT-25-01-18 5.95 120 -17 658883 5429043 Lotto Excavation
LT-25-01-19 6.42 120 -10 658892 5429046 Lotto Excavation
LT-25-01-20 11.56 120 9 658872 5428980 Lotto Excavation
LT-25-01-21 20.31 120 9 658873 5428988 Lotto Excavation
LT-25-01-22 27.30 120 6 658873 5428997 Lotto Excavation
LT-25-01-23 30.92 120 5 658877 5429003 Lotto Excavation
LT-25-01-24 40.93 120 8 658883 5429008 Lotto Excavation
LT-25-01-25 41.40 120 7 658887 5429015 Lotto Excavation
LT-25-01-26 41.82 120 6 658891 5429021 Lotto Excavation
LT-25-01-27 42.29 120 6 658895 5429027 Lotto Excavation
LT-25-01-28 46.20 120 4 658897 5429035 Lotto Excavation
LT-25-01-29 49.44 120 2 658901 5429041 Lotto Excavation
LT-25-01-30 55.59 120 0 658901 5429050 Lotto Excavation
LT-25-01-31 41.83 120 -3 658907 5429055 Lotto Excavation
LT-25-01-32 20.89 120 -14 658905 5429065 Lotto Excavation
LT-25-01-33 8.73 120 19 658931 5429050 Lotto Excavation
LT-25-01-34 18.03 120 -10 658922 5429064 Lotto Excavation
LT-25-01-35 8.15 120 -17 658926 5429070 Lotto Excavation
LT-25-01-36 2.56 121 9 658886 5428955 Lotto Excavation
LT-25-01-37 2.90 122 -5 658892 5428960 Lotto Excavation
LT-25-01-38 3.85 119 16 658897 5428966 Lotto Excavation



LT-25-01-39 8.21 120 3 658901 5428972 Lotto Excavation
LT-25-01-40 3.73 120 10 658906 5428978 Lotto Excavation
LT-25-01-41 4.69 120 13 658909 5428984 Lotto Excavation
LT-25-01-42 5.80 50 -6 658903 5428964 Lotto Excavation
LT-25-01-43 11.77 49 1 658908 5428958 Lotto Excavation
LT-25-01-44 14.20 50 10 658913 5428953 Lotto Excavation
LT-25-01-45 2.97 49 1 658916 5428946 Lotto Excavation
LT-25-01-46 2.42 51 13 658924 5428952 Lotto Excavation
LT-25-01-47 3.40 49 1 658928 5428956 Lotto Excavation
LT-25-01-48 4.30 49 14 658919 5428938 Lotto Excavation
LT-25-01-49 4.16 50 -3 658928 5428946 Lotto Excavation
LT-25-01-50 5.15 50 1 658935 5428952 Lotto Excavation
LT-25-01-51 0.90 51 -21 658922 5428931 Lotto Excavation
LT-25-01-52 3.79 50 -19 658934 5428941 Lotto Excavation
LT-25-01-53 5.25 50 3 658942 5428950 Lotto Excavation
LT-25-01-54 0.75 46 -9 658928 5428926 Lotto Excavation
LT-25-01-55 2.13 48 2 658940 5428936 Lotto Excavation
LT-25-01-56 0.75 49 8 658933 5428920 Lotto Excavation
LT-25-01-57 3.78 50 3 658907 5428961 Lotto Excavation
NFGC-25-2631 209 330 -45 658868 5428935 Lotto
NFGC-25-2639 131 290 -50 658861 5429093 Lotto
NFGC-25-2646 245 290 -48 658971 5429086 Lotto
NFGC-25-2652 341 262 -46.5 659128 5429075 Lotto
NFGC-25-2661 323 260 -43 659128 5429076 Lotto
NFGC-25-2672 356 256 -51.5 659127 5429018 Lotto
NFGC-25-2680 323 260 -44.5 659124 5429018 Lotto

Sampling, Sub-sampling, and Laboratory

All drilling recovers HQ core. For deep and condemnation holes, the core size may be reduced to NQ. The drill core is split in half using a diamond saw or a hydraulic splitter for rare intersections with incompetent core.

A geologist examines the drill core and marks out the intervals to be sampled and the cutting line. Sample lengths are mostly 1.0 meter and adjusted to respect lithological and/or mineralogical contacts and isolate narrow (<1.0m) veins or other structures that may yield higher grades.

Technicians saw the core along the defined cutting line. One-half of the core is kept as a witness sample and the other half is submitted for analysis. Individual sample bags are sealed and placed into totes, which are then sealed and marked with the contents.


All channel samples are collected directly from the bedrock.

A geologist examines the bedrock and marks out the intervals to be sampled and the cutting line. Sample lengths are mostly 1.0 m and adjusted to respect lithological and/or mineralogical contacts and isolate narrow (<1.0m) veins or other structures that may yield higher grades.

Technicians saw the channel along the cut line, producing two lines 5 cm apart and approximately 6-8 cm deep. The sample is removed from the bedrock and placed into sample bags. Individual sample bags are sealed and placed into totes, which are then sealed and marked with the contents.

New Found Gold has submitted samples for gold determination by PhotonAssay™ to ALS Canada Ltd. ("ALS") since February 2024. ALS operates under a commercial contract with New Found Gold.

Drill core and channel samples are shipped to ALS for sample preparation and gold analysis in Thunder Bay, Ontario.  ALS does not currently have accreditation for the PhotonAssay™ method at their Thunder Bay, ON laboratory. They do however have ISO/IEC 17025 (2017) accreditation for gamma ray analysis of samples for gold at their Australian labs with this method, including the Canning Vale lab in Perth, WA.

Samples submitted to ALS beginning in February 2024, received gold analysis by photon assay whereby the entire sample is crushed to approximately 70% passing 2 mm mesh. The sample is then riffle split and transferred into jars. For "routine" samples that do not have VG identified, one (300-500g) jar is analyzed by photon assay. If the jar assays greater than 0.8 g/t, the remaining crushed material is weighed into multiple jars and submitted for photon assay. For channel samples which returned greater than 0.8 g/t, 50% of the material was analysed, to a minimum of 3 kg, due to very large sample size.

For samples that have VG identified, the entire crushed sample is riffle split and weighed into multiple jars that are submitted for photon assay. The assays from all jars are combined on a weight-averaged basis.

Select samples prepared at ALS are also analyzed for a multi-element ICP package (ALS method code ME-ICP61) at ALS Vancouver.

Drill program design, Quality Assurance/Quality Control, and interpretation of results are performed by qualified persons employing a rigorous Quality Assurance/Quality Control program consistent with industry best practices. Standards and blanks account for a minimum of 10% of the samples in addition to the laboratory's internal quality assurance programs.

Quality Control data are evaluated on receipt from the laboratories for failures. Appropriate action is taken if assay results for standards and blanks fall outside allowed tolerances. All results stated have passed New Found Gold's quality control protocols.


New Found Gold's quality control program also includes submission of the second half of the core for approximately 2% of the drilled intervals. In addition, approximately 1% of sample pulps for mineralized samples are submitted for re-analysis to a second ISO-accredited laboratory for check assays.

The Company does not recognize any factors of drilling, sampling, or recovery that could materially affect the accuracy or reliability of the assay data disclosed.

The assay data disclosed in this press release have been verified by the Company's Qualified Person against the original assay certificates.

Qualified Person

The scientific and technical information disclosed in this press release was reviewed and approved by Melissa Render, P. Geo., President, and a Qualified Person as defined under National Instrument 43-101. Ms. Render consents to the publication of this press release by New Found Gold. Ms. Render certifies that this press release fairly and accurately represents the scientific and technical information that forms the basis for this press release.

About New Found Gold

New Found Gold is an emerging Canadian gold producer with assets in NL, Canada. The Company holds a 100% interest in its fully funded flagship asset, Queensway, as well as the Hammerdown Gold Project which includes the Hammerdown deposit and Pine Cove. New Found Gold is focused on bringing the Hammerdown deposit into commercial gold production in H2/26 while advancing its flagship Queensway toward Phase I production.

The Company's portfolio is further strengthened by its district-scale land package at Queensway, covering more than 110 km of strike length across two highly prospective faults zones, and a strong shareholder base, including renowned mining investor and cornerstone shareholder, Eric Sprott.

On June 29, 2026, the Company announced it had received conditional approval to graduate to the Toronto Stock Exchange. The stock symbol "NFGC" has been reserved for use by the Company upon listing on the TSX, to align with its stock symbol on the NYSE American LLC.

Keith Boyle, P.Eng.

Chief Executive Officer

New Found Gold Corp.

Contact

For further information on New Found Gold contact us through our investor inquiry form at https://newfoundgold.ca/contact/contact-us/ or contact:

Fiona Childe, Ph.D., P.Geo.

Vice President, Communications and Corporate Development

Phone: +1 (416) 775-2700

Email: contact@newfoundgold.ca


Follow us on social media at https://www.linkedin.com/company/newfound-gold-corp and https://x.com/newfoundgold.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statement Cautions

This press release contains certain "forward-looking statements" within the meaning of Canadian securities legislation, including relating to the Company's drill programs on its Queensway Gold Project in Newfoundland and Labrador, Canada, and the timing, results, interpretation and use of the results, including expected incorporation of data into future MRE for Queensway; continued refining and derisking of the Company's mine plan and geological model; advancement towards near-term production at Queensway; further testing and expansion of secondary veins; planned additional infill drilling to complete the conversion program at Lotto in H2/26; planned reporting of the remaining results from 2025 drilling; the excavation programs and the timing and results thereof; future drill and excavation programs and the timing and focus thereof; exploration, drilling and mineralization at Queensway; the extent of mineralization and the continuity of high-grade gold mineralization; the potential resource expansions; planned filing of an updated Technical Report for Queensway, including an updated MRE, in H2/26; and the Company's focus on bringing the Hammerdown deposit into commercial gold production in H2/26 while advancing its flagship Queensway toward Phase I production;. Although the Company believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. Forward-looking statements are statements that are not historical facts; they are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "interpreted", "intends", "estimates", "projects", "aims", "suggests", "indicate", "often", "target", "future", "likely", "pending", "potential", "encouraging", "goal", "objective", "prospective", "possibly", "preliminary", and similar expressions, or that events or conditions "will", "would", "may", "can", "could" or "should" occur, or are those statements, which, by their nature, refer to future events. The Company cautions that forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made, and they involve a number of risks and uncertainties. Consequently, there can be no assurances that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Except to the extent required by applicable securities laws and the policies of the TSXV, the Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change. Factors that could cause future results to differ materially from those anticipated in these forward-looking statements include risks associated with the Company's ability to complete exploration and drilling programs as expected, possible accidents and other risks associated with mineral exploration operations, the risk that the Company will encounter unanticipated geological factors, risks associated with the interpretation of exploration results and the results of the metallurgical testing program, the possibility that the Company may not be able to secure permitting and other governmental clearances necessary to carry out the Company's exploration plans, the risk that the Company will not be able to raise sufficient funds to carry out its business plans, and the risk of political uncertainties and regulatory or legal changes that might interfere with the Company's business and prospects. The reader is urged to refer to the Company's Annual Information Form and Management's Discussion and Analysis, publicly available through the Canadian Securities Administrators' System for Electronic Document Analysis and Retrieval (SEDAR+) at www.sedarplus.ca for a more complete discussion of such risk factors and their potential effects.


Filing Exhibits & Attachments

1 document