STOCK TITAN

Nova Minerals confirms ~216,000-tonne annual capacity

Each of the two parallel mill trains is rated at approximately 108,000 tonnes per annum.

Available on EDGAR Accepted by SEC EDGAR Learn about SEC filing dates
(Moderate)

Sentiment and the balance of points

Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.

Form Type
8-K

Rhea-AI Filing Summary

Nova Minerals Corp said an engineering and processing-capacity assessment confirmed approximately 216,000 tonnes per annum of front-end crushing, grinding and concentration capacity at the Port MacKenzie, Alaska plant. Nova is advancing a Phase 1 refinery under a fully funded $43.4 million Department of War-supported project. The refinery is designed to produce up to approximately 600 tpa of refined antimony, with domestic production of military-grade antimony trisulphide targeted for 2027; standard Grade II antimony metal, greater than 99.65% purity, is an intermediate co-product.

Capacity modeling indicates potential refined antimony production of approximately 9,400 tpa at a 5% antimony feed grade and 20,000 tpa at a 10% grade, subject to feed grade, additional downstream refinery equipment and other operating requirements. Under those modeled scenarios, additional primary crushing, sorting or grinding equipment would not be required; expansion would principally require downstream refining capacity. The facility could also process feedstock from Nova’s Estelle Project and suitable third-party mineral sources.

Item 7.01 Regulation FD Disclosure Disclosure
Material non-public information disclosed under Regulation Fair Disclosure, often investor presentations or guidance.
Item 9.01 Financial Statements and Exhibits Exhibits
Financial statements, pro forma financial information, or exhibit attachments filed with this report.
Front-end processing capacity Approximately 216,000 tonnes per annum Capacity assessment for the Port MacKenzie plant.
Capacity per mill train Approximately 108,000 tpa Each of the two parallel mill trains.
Department of War award $43.4 million Described as fully funding the Phase 1 project.
Phase 1 refined antimony design capacity Up to approximately 600 tpa Initial refinery production capacity.
Phase 1 production target 2027 Targeted domestic production of military-grade antimony trisulphide.
Modeled refined antimony production Approximately 9,400 tpa Based on a 5% antimony feed grade; subject to additional downstream refinery equipment and other operating requirements.
Modeled refined antimony production Approximately 20,000 tpa Based on a 10% antimony feed grade; subject to additional downstream refinery equipment and other operating requirements.
Antimony metal purity Greater than 99.65% Standard Grade II antimony metal described as an intermediate co-product.
front-end processing capacity technical
"216,000 tpa front-end processing capacity"
hydrometallurgical flowsheet technical
"developed a hydrometallurgical flowsheet"
A hydrometallurgical flowsheet is a step-by-step diagram showing how an ore or concentrate is treated with liquids and chemical reactions to dissolve, separate, and recover metals. Think of it as a recipe or factory assembly line that lays out leaching, solution purification, and metal recovery stages, with inputs, outputs and conditions for each step. It matters to investors because the chosen flowsheet drives expected metal recoveries, operating costs, capital needs and environmental permitting risks.
electrowinning technical
"electrowinning capacity representing the principal production constraint"
Electrowinning is an industrial process that uses an electric current to pull dissolved metal from a liquid and plate it as solid metal onto an electrode, similar to drawing metal out of a soup and letting it form a clean chunk on a spoon. For investors, it matters because it determines how efficiently and cheaply metals like copper, nickel or lithium can be produced, affecting a mine or plant’s margins, output speed, environmental footprint and the reliability of metal supply.
toll-processing technical
"potential for Port MacKenzie to become a regional toll-processing destination"
feed grade technical
"5% antimony feed grade"

FAQ

AI-generated questions and answers. How Rhea-AI works. Not financial advice.

How much antimony could NVA produce at commercial scale?

Nova’s capacity modeling indicates potential refined antimony production of approximately 9,400 tpa at a 5% antimony feed grade and 20,000 tpa at a 10% grade, subject to additional downstream refinery equipment and other operating requirements.

How many mill trains does NVA’s Port MacKenzie plant have?

The grinding circuit comprises two parallel mill trains, each capable of processing approximately 108,000 tpa. The assessment says additional primary crushing, sorting and grinding equipment would not be required under the modeled production scenarios.

What other minerals could NVA process at Port MacKenzie?

Nova says the infrastructure could support suitable third-party ores and concentrates and evaluation of tungsten, gallium, bismuth, tellurium and arsenic, along with other strategic elements.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google
false 0001852551 0001852551 2026-11-10 2026-11-10 0001852551 NVA:CommonStock0.001ParValuePerShareMember 2026-11-10 2026-11-10 0001852551 NVA:WarrantsToPurchaseCommonStockMember 2026-11-10 2026-11-10 iso4217:USD xbrli:shares iso4217:USD xbrli:shares

 

 

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

FORM 8-K

 

CURRENT REPORT

Pursuant to Section 13 or 15(d)

of the Securities Exchange Act of 1934

 

Date of Report (Date of earliest event reported): November 10, 2026

 

Nova Minerals Corp

(Exact name of registrant as specified in its charter)

 

Nevada   001-42132   42-1800080
(State or other Jurisdiction
of Incorporation)
 

(Commission

File Number)

  (IRS Employer
Identification No.)

 

6312 South Fiddlers Green Circle, Suite 300E

Greenwood Village, Colorado

  80111
(Address of Principal Executive Offices)   (Zip Code)

 

Registrant’s Telephone Number, including Area Code: (720) 550-4223

 

(Former Name or Former Address, if Changed Since Last Report): Not Applicable

 

Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions:

 

☐ Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)
   
☐ Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)
   
☐ Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))
   
☐ Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))

 

Securities registered pursuant to Section 12(b) of the Act:

 

Title of each class   Trading Symbol   Name of exchange on which registered
Common Stock, $0.001 par value per share   NVA   NYSE American LLC
Warrants to purchase Common Stock   NVAWS   NYSE American LLC

 

Indicate by check mark whether the registrant is an emerging growth company as defined in Rule 405 of the Securities Act of 1933 (§230.405 of this chapter) or Rule 12b-2 of the Securities Exchange Act of 1934 (§240.12b-2 of this chapter)

 

Emerging growth company ☒

 

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐

 

 

 

 
 

 

Item 7.01 Regulation FD Disclosure.

 

On November 10, 2026, Nova Minerals Corp issued a press release titled “Nova Minerals Confirms 216,000 tpa Processing Capacity, Advancing Alaska’s Critical Minerals Hub”, which is attached as Exhibit 99.1 hereto.

 

The information in this Item 7.01, including Exhibit 99.1 attached hereto, is being furnished and shall not be deemed “filed” for the purposes of Section 18 of the Securities Exchange Act of 1934, as amended, or otherwise subject to the liabilities of that Section. The information in this Item 7.01 shall not be incorporated by reference into any registration statement or other document pursuant to the Securities Act of 1933, as amended, except as otherwise expressly stated in such filing.

 

Item 9.01. Financial Statements and Exhibits.

 

(d) Exhibits

 

Exhibit No.   Description
     
99.1   Press release, dated November 10, 2026
104   Cover Page Interactive Data File (the cover page XBRL tags are embedded within the iXBRL document)

 

2
 

 

SIGNATURES

 

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.

 

  Nova Minerals Corp
     
Date: November 10, 2026   /s/ Ian Pamensky
  Name:  Ian Pamensky
  Title: Secretary

 

3

 

 

Exhibit 99.1

 

 

Nova Minerals Confirms 216,000 tpa Processing Capacity, Advancing Alaska’s Critical Minerals Hub

 

Anchorage, Alaska, November 10, 2026 – Nova Minerals Corp (“Nova” or the “Company”) (NYSE American: NVA | ASX: NVA) is pleased to announce that an engineering and processing capacity assessment of its newly acquired processing plant, which is to be constructed at Port MacKenzie, Alaska, has confirmed front-end crushing, grinding and concentration capacity of approximately 216,000 tonnes per annum (tpa). This substantial processing capacity provides a scalable platform for future commercial antimony production, with capacity modelling indicating potential refined antimony production of up to approximately 20,000 tpa, subject to feed grade, additional downstream refinery equipment and other operating requirements.

 

The processing infrastructure provides a strong foundation for Nova’s strategy to establish a fully integrated U.S. domestic antimony and critical minerals processing and refining hub in Alaska, with the capability to produce both antimony metal and antimony trisulphide. The facility is also intended to support processing of feedstock from Nova’s Estelle Project and potentially suitable third-party mineral sources, creating opportunities to expand domestic processing capacity and strengthen U.S. critical minerals supply chains.

 

Highlights

 

  ● 216,000 tpa processing capacity: Plant crushing, sorting, grinding and concentration infrastructure provides significant capacity for future commercial operations.
     
  ● Two parallel grinding circuits: Two mill trains, each with approximately 108,000 tpa capacity, provide operational flexibility, staged expansion opportunities, and capacity for additional suitable mineral feedstocks.
     
  ● Phase 1 pilot-scale refinery up to 600 tpa: Initial production of military-grade antimony trisulphide and >99.65% antimony metal is being advanced under the fully funded $43.4 million Department of War (DoW) supported project.
     
  ● Significant full-scale commercial expansion potential: Capacity modelling indicates potential refined antimony production of approximately 9,400 – 20,000 tpa, with 5 – 10% Sb feed grade, subject to additional downstream refinery equipment and other operating requirements.
     
  ● Multi-commodity processing opportunity: Plant infrastructure could also support processing of tungsten, gallium, bismuth, tellurium, arsenic, and other suitable critical mineral feedstocks.
     
  ● Potential regional toll-processing hub: Port MacKenzie provides a strategic processing destination for Nova’s Estelle Project and potentially other third-party mineral producers.

 

 
 

 

Nova Minerals CEO, Mr. Christopher Gerteisen, commented:

 

“The confirmation of 216,000 tonnes per annum of front-end processing capacity is a significant milestone for Nova and highlights the strategic value of the infrastructure we have secured at Port MacKenzie.

 

“While our initial $43.4 million Department of War supported project is focused on establishing production of up to 600 tonnes per annum of refined antimony, the processing infrastructure acquired provides a clear pathway to a substantially larger commercial operation, with additional downstream refining equipment representing the principal requirement for expansion.

 

“Importantly, this infrastructure also creates opportunities beyond antimony, with the potential to establish Port MacKenzie as a multi-commodity critical minerals processing and refining hub serving Nova’s Estelle Project and other mineral producers throughout Alaska and the broader region.

 

“Our vision is to develop strategically important domestic processing infrastructure that supports US critical minerals independence, strengthens secure domestic supply chains and positions Alaska as a major participant in the US critical minerals industry.”

 

216,000 tpa – A Significant Processing Infrastructure Advantage

 

The modern turnkey processing plant, previously owned and operated by Agnico-Eagle at the Hope Bay Gold Project, has been procured and delivered to Nova’s Port MacKenzie site. The plant incorporates crushing, grinding, gravity, flotation and leaching circuits, together with associated equipment and engineering plans. A Steinert ore sorter has also been separately procured.

 

The grinding circuit establishes overall processing capacity of approximately 216,000 tpa, comprising two parallel mill trains, each capable of processing approximately 108,000 tpa.

 

This substantial front-end capacity provides operational flexibility and the ability to progressively expand production without requiring replacement of the major existing processing infrastructure. It also provides a potential capital advantage compared with developing an entirely new processing facility.

 

Phase 1 Pilot-Scale 600 tpa Refinery – Foundation for Larger Commercial Expansion

 

Nova is currently advancing its Phase 1 refinery under the $43.4 million DoW supported project, targeting domestic production of military-grade antimony trisulphide in 2027.

 

Based on extensive metallurgical test-work, Nova has developed a hydrometallurgical flowsheet incorporating leaching, electrowinning, melting and sulphurization to produce military-grade antimony trisulphide, with standard Grade II antimony metal (greater than 99.65% purity) as an intermediate co-product.

 

The initial refinery is designed to produce up to approximately 600 tpa of refined antimony, with electrowinning capacity representing the principal production constraint. This deliberately staged, pilot-scale development reflects the scope of the DoW funded project and is not representative of the substantially larger processing capacity which will be available through the already acquired front-end plant.

 

 
 

 

Commercial Expansion - Potential Production of up to 20,000 tpa Refined Antimony

 

Following successful completion of Phase 1, Nova sees a clear pathway to substantially increasing commercial antimony production by leveraging the existing 216,000 tpa front-end processing infrastructure and installing additional downstream refinery equipment, principally electrowinning and melting capacity.

 

Depending on feed grade and assuming sufficient downstream refinery capacity, modelling indicates potential refined antimony production of approximately:

 

  ● 9,400 tpa based on a 5% antimony feed grade; and
     
  ● 20,000 tpa based on a 10% antimony feed grade.

 

The capacity assessment indicates that additional primary crushing, sorting and grinding equipment would not be required under the modelled production scenarios. The principal expansion requirement would be additional downstream refining capacity.

 

These scenarios highlight the significant potential of the acquired infrastructure to support a much larger commercial antimony operation as Nova progresses beyond the initial Phase 1 project.

 

Beyond Antimony – Building America’s Critical Minerals Hub in Alaska

 

The 216,000 tpa processing platform also creates opportunities beyond antimony, with the potential to process suitable third-party ores and concentrates and evaluate additional critical mineral commodities, including tungsten, gallium, bismuth, tellurium, arsenic, and other strategic elements.

 

Nova sees the potential for Port MacKenzie to become a regional toll-processing destination, providing third-party mineral producers with access to established processing infrastructure while creating potential additional revenue streams for the Company.

 

Nova is actively engaged in collaborations with the University of Alaska Fairbanks CORE-CM, the National Science Foundation Critical Mineral Accelerator Engine in Alaska and other US Government programs. The Company is also pursuing additional funding opportunities, with applications submitted and under review, to support development of the Estelle Critical Minerals Project and Port MacKenzie Processing and Refining Hub.

 

Qualified Persons

 

The information contained in this report, relating to the process plant modelling, is based on, and fairly and accurately represent the information and supporting documentation prepared by Mr Damian Connelly. Mr Connelly is a full-time employee of METS Engineering who are a Contractor to Nova Minerals Corp, and a Fellow of The Australasian Institute of Mining and Metallurgy. Mr Connelly has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration, and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Exploration Targets, Mineral Resources and Ore Reserves. Mr Connelly consents to the inclusion in the report of the matters based on the results in the form and context in which they appear.

 

 
 

 

About Nova Minerals Corp

 

Nova Minerals Corp is advancing one of the world’s largest undeveloped gold deposits into production and securing a US domestic supply of the critical mineral antimony. The Company is focused on the exploration and development of the Estelle Gold and Critical Minerals Project, located in Alaska, a tier-one mining jurisdiction.

 

Estelle hosts two defined multi-million-ounce gold resources, and more than 20 prospects distributed along a 35-kilometre mineralized trend, in the prolific Tintina Gold Belt, a province which hosts a >220 million ounce (Moz) documented gold endowment and some of the world’s largest gold mines and discoveries including Kinross Gold Corporation’s Fort Knox Gold Mine. In parallel, Nova is advancing its critical minerals strategy, fully-funded by a $43.4 million U.S. Department of War award to develop a domestic antimony supply chain, targeted for production in 2027.

 

Further discussion and analysis of the Estelle Project is available through the interactive Vrify 3D animations, presentations, and videos, all available on the Company’s website www.novamineralscorp.com.

 

Forward Looking Statements

 

This press release contains “forward-looking statements” within the meaning of Section 27A of the Securities Act, and Section 21E of the Exchange Act which are subject to the “safe harbor” created by those sections. All statements, other than statements of historical fact, contained in this press release are forward-looking statements and that are subject to substantial risks and uncertainties. Forward-looking statements contained in this press release may be identified by the use of words such as “anticipate,” “believe,” “contemplate,” “could,” “estimate,” “expect,” “intend,” “seek,” “may,” “might,” “plan,” “potential,” “predict,” “project,” “target,” “aim,” “should,” “will,” “would,” or the negative of these words or other similar expressions, although not all forward-looking statements contain these words.

 

In particular, forward-looking statements contained in this press release refer to the engineering and processing capacity assessment for its planned antimony processing and refining facility at Port MacKenzie, Alaska, including production and processing capacity potential, milling capacity, crushing, sorting, grinding and concentration capacity, modelling results, future commercial antimony production and antimony recovery. Such forward-looking statements are based on engineering assessments and modelling using specified assumptions and are not actual production results or guarantees of future performance. Actual results may differ materially due to a range of risks and uncertainties.

 

Forward-looking statements are based on Nova Minerals Corp’s current expectations. are subject to inherent uncertainties, risks and assumptions that are difficult to predict and involve known and unknown risks, uncertainties, assumptions and other factors which may cause our actual results, performance or achievements to be materially different from any results, performance or achievements expressed or implied by such forward-looking statements. Further, certain forward-looking statements are based on assumptions as to future events that may not prove to be accurate. Readers are cautioned not to place undue reliance on forward-looking statements. Although the forward-looking statements included in this press release were based on assumptions that Nova Minerals Corp believes are reasonable when made, readers are cautioned that forward-looking statements are not guarantees of future performance and that actual results, performance or achievements may differ materially from those made in or suggested by the forward-looking statements contained in this press release. Any forward-looking statements made in this press release speak only as of the date of those statements, and Nova Minerals Corp undertakes no obligation to update those statements or to publicly announce the results of any revisions to any of those statements to reflect future events or developments except as required under applicable law.

 

For further information:

 

Nova Minerals:   Media:   Investor Relations:
Craig Bentley   Jenna Shinderman   Dave Gentry, CEO
Executive Director   Sodali & Co   RedChip Companies, Inc.
Ph: 1-720-550-4223   Ph: 1-631-918-4047   Ph: 1-407-644-4256
E: craig@novamineralscorp.com   E: jenna.shinderman@sodali.com   E: NVA@redchip.com

 

 

Filing Exhibits & Attachments

6 documents

Keep reading