Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.
Form 20-F [ ] Form 40-F [ X ]
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
EXHIBIT 99.1
Osisko Gold Confirms Presence of Mineralized System with Open Pit
Potential at the Proserpine Target on the Cariboo Gold Project's Regional Property; Exploration Drilling Highlights Include 95.93
g/t Au over 4.60 m at 71 m Vertical Depth and 5.46 g/t Au over 8.60 m at 77 m Vertical Depth
HIGHLIGHTS
- 6,463 m in 14 drill holes of new surface exploration drilling at the Proserpine regional exploration target,
located 7 km along strike to the southeast of the Cariboo Gold deposit
- Results confirm the presence of an emerging gold mineralized system comprising high-grade structures exhibiting
similarities to those at the Cariboo Gold deposit that, together with broader zones of lower-grade mineralization, may indicate potential
for open pit mining methods
- Highlight intercepts include: 95.93 g/t Au over 4.60 m at 71 m vertical depth (including 873.00 g/t Au
over 0.50 m), 5.46 g/t Au over 8.60 m at 77 m vertical depth, and 2.17 g/t Au over 14.45 m at 431 m vertical depth
- Drilling of an additional 26,500 m planned metres, initially with three rigs, is now resuming following
a seasonal hiatus
|
|
| |
|
TORONTO, Aug. 05, 2026 (GLOBE NEWSWIRE) -- Osisko Gold Group Inc. (NYSE: OGG, TSXV: OGG) ("Osisko
Gold" or the "Company") is pleased to announce its first set of new diamond drilling results consisting of fourteen
holes from the surface exploration program on the Proserpine regional greenfield target, located within the broader Cariboo Gold Project
property boundary and approximately 7 kilometres ("km") from the Company's permitted, 100%-owned Cariboo Gold Project
(the "Project") in central British Columbia, Canada.
Chris Lodder, President, stated, "We are encouraged by the initial results from the drill campaign at Proserpine,
which highlight the potential for a significant new gold mineralized system of scale located only 7 km from the Cariboo Gold deposit.
Drilling has intersected high-grade structures showing similarities to those at Cariboo, but also containing areas with broader lower
grade mineralization that may indicate potential for bulk mining methods. To date, drilling has broadly tested an area measuring approximately
1.0 km x 0.5 km within a larger target of 6.0 km x 1.0 km gold-in-soil and rock anomaly. For context, the currently defined Cariboo Gold
deposit extends approximately 4.0 km along strike by 0.5 km in width, underscoring the exploration potential that remains to be tested
at Proserpine."
DRILL ASSAY HIGHLIGHTS
This news release contains assays from fourteen (14) diamond drillholes ("DD") totalling 6,463 meters
("m") with depths ranging from 36.0 to 734.3 m (see Table 1 and Figure 3) completed between February
and May of 2026. All holes were collared in HQ (63.5 millimetre diameter) and reduced to NQ (47.6 millimetre diameter) where necessary
to continue advancing. Estimated true widths of intercepts are provided in Table 1. Select highlights include:
- 95.93 grams per tonne ("g/t") gold ("Au") over 4.60 m at 71 m vertical depth in PSP-26-004, including:
- 873.00 g/t Au over 0.50 m, and
- 3.77 g/t Au over 1.20 m
- 5.46 g/t Au over 8.60 m at 77 m vertical depth in PSP-26-001 (Figure 1), including:
- 16.05 g/t Au over 1.10 m, and
- 12.50 g/t Au over 0.87 m, and
- 10.25 g/t Au over 0.50 m, and
- 5.97 g/t Au over 0.70 m, and
- 5.21 g/t Au over 0.80 m, and
- 3.36 g/t Au over 0.60 m, and
- 1.50 g/t Au over 0.90 m, and
- 1.18 g/t Au over 0.90 m
- 2.17 g/t Au over 14.45 m at 431 m vertical depth in PSP-26-001, including:
- 35.10 g/t Au over 0.65 m, and
- 8.61 g/t Au over 0.50 m, and
- 2.21 g/t Au over 0.50 m, and
- 1.21 g/t Au over 0.50 m
- 1.46 g/t Au over 12.40 m at 295 m vertical depth in PSP-26-003, including:
- 15.40 g/t Au over 1.00 m, and
- 2.02 g/t Au over 0.50 m
- 3.17 g/t Au over 5.45 m at 334 m vertical depth in PSP-26-009, including:
- 19.30 g/t Au over 0.60 m, and
- 9.52 g/t Au over 0.50 m, and
- 1.22 g/t Au over 0.50 m
- 1.30 g/t Au over 12.00 m at 27 m vertical depth in PSP-26-011, including:
- 9.92 g/t Au over 0.70 m, and
- 6.19 g/t Au over 0.50 m, and
- 3.63 g/t Au over 0.50 m, and
- 3.75 g/t Au over 0.50 m, and
- 1.50 g/t Au over 0.65 m
- 2.93 g/t Au over 5.15 m at 233 m vertical depth in PSP-26-001, including:
- 4.30 g/t Au over 3.10 m at 226 m vertical depth in PSP-26-001, including:
- 18.75 g/t Au over 0.50 m, and
- 7.54 g/t Au over 0.50 m
- 2.79 g/t Au over 4.00 m at 184 m vertical depth in PSP-26-014, including:
- 2.30 g/t Au over 4.50 m at 17 m vertical depth in PSP-26-007, including:
- 12.25 g/t Au over 0.50 m, and
- 5.62 g/t Au over 0.50 m, and
- 1.73 g/t Au over 0.50 m, and
- 1.09 g/t Au over 0.50 m
Results to date have expanded the footprint of known mineralization at Proserpine to approximately 1.0 km along strike
by 0.5 km in width, with mineralization remaining open in all directions. All drill holes that reached their intended target depths encountered
mineralization, providing a compelling basis for systematic follow-up drilling. Mineralization was encountered from near surface to vertical
depths exceeding 400 metres. In particular, hole PSP-26-001 returned several notable mineralized intercepts beginning at a vertical depth
of approximately 55 metres and with the deepest at more than 400 metres from surface.
FIGURE 1: 5.46 g/t Au over 8.6 m in PSP-26-001 at approximately 77 m vertical depth.

Drilling also intersected significant intervals of the prospective siliceous sandstone unit, confirming its presence
within the target area and providing additional information to refine the geologic model. Based on preliminary observations to date, the
siliceous sandstone is believed to represent a more favourable host for mineralization than the calcareous sandstone (see Figure
3).
Diamond drilling at Proserpine has resumed with three active drill rigs following a brief, planned seasonal hiatus.
Additional drill rigs may be mobilized as warranted as the planned drill program continues to expand the mineralized footprint and increase
drillhole density at Proserpine Southeast, while initiating first-pass drilling at previously untested targets at Proserpine Northwest.
FIGURE 2: Cariboo Gold regional overview.

FIGURE 3: Plan view of Proserpine diamond drilling with select intercept highlights.

FIGURE 4: Proserpine diamond drilling select intercept highlights in long section.

TABLE 1: Select manual composite and individual sample highlights greater than or equal
to 1.0 g/t Au.
| Drillhole
ID |
|
From
(m) |
To
(m) |
Length
(m) |
Au
g/t |
Est.
True Width (m) |
Approx.
Vertical Depth (m) |
| PSP-26-001 |
|
71.50 |
72.15 |
0.65 |
1.16 |
0.42 |
55 |
| |
|
79.70 |
83.60 |
3.90 |
1.18 |
2.95 |
62 |
| |
Including |
80.20 |
81.30 |
1.10 |
2.71 |
|
|
| |
and |
83.05 |
83.60 |
0.55 |
1.67 |
|
|
| |
|
97.00 |
105.60 |
8.60 |
5.46 |
6.51 |
77 |
| |
Including |
97.50 |
98.20 |
0.70 |
5.97 |
|
|
| |
and |
98.20 |
99.00 |
0.80 |
5.21 |
|
|
| |
and |
100.73 |
101.60 |
0.87 |
12.50 |
|
|
| |
and |
101.60 |
102.70 |
1.10 |
16.05 |
|
|
| |
and |
102.70 |
103.20 |
0.50 |
10.25 |
|
|
| |
and |
103.20 |
104.10 |
0.90 |
1.50 |
|
|
| |
and |
104.10 |
105.00 |
0.90 |
1.18 |
|
|
| |
and |
105.00 |
105.60 |
0.60 |
3.36 |
|
|
| |
|
146.40 |
147.10 |
0.70 |
1.49 |
0.35 |
112 |
| |
|
165.95 |
166.70 |
0.75 |
1.60 |
0.58 |
126 |
| |
|
288.95 |
289.60 |
0.65 |
1.23 |
0.56 |
219 |
| |
|
290.45 |
290.95 |
0.50 |
1.11 |
0.45 |
220 |
| |
|
297.80 |
300.90 |
3.10 |
4.30 |
2.46 |
226 |
| |
Including |
297.80 |
298.30 |
0.50 |
7.54 |
|
|
| |
and |
300.40 |
300.90 |
0.50 |
18.75 |
|
|
| |
|
304.70 |
309.85 |
5.15 |
2.93 |
3.95 |
233 |
| |
Including |
304.70 |
305.65 |
0.95 |
15.60 |
|
|
| |
|
312.70 |
313.25 |
0.55 |
1.21 |
0.42 |
237 |
| |
|
334.80 |
335.30 |
0.50 |
1.74 |
0.38 |
254 |
| |
|
343.95 |
344.45 |
0.50 |
3.98 |
0.32 |
261 |
| |
|
494.70 |
495.20 |
0.50 |
3.04 |
0.41 |
376 |
| |
|
559.85 |
562.35 |
2.50 |
1.04 |
2.11 |
420 |
| |
Including |
561.85 |
562.35 |
0.50 |
4.53 |
|
|
| |
|
572.00 |
586.45 |
14.45 |
2.17 |
11.80 |
431 |
| |
Including |
574.25 |
574.75 |
0.50 |
1.21 |
|
|
| |
and |
574.75 |
575.25 |
0.50 |
2.21 |
|
|
| |
and |
577.55 |
578.20 |
0.65 |
35.10 |
|
|
| |
and |
585.45 |
585.95 |
0.50 |
8.61 |
|
|
| |
|
591.50 |
593.00 |
1.50 |
1.10 |
0.96 |
440 |
| PSP-26-002 |
|
15.50 |
16.00 |
0.50 |
1.00 |
0.38 |
12 |
| |
|
36.60 |
37.20 |
0.60 |
2.57 |
0.39 |
26 |
| |
|
47.00 |
47.50 |
0.50 |
3.25 |
0.32 |
34 |
| |
|
52.10 |
52.60 |
0.50 |
1.20 |
0.35 |
37 |
| |
|
73.50 |
74.50 |
1.00 |
2.54 |
0.82 |
52 |
| |
Including |
74.00 |
74.50 |
0.50 |
4.68 |
|
|
| |
|
89.70 |
90.20 |
0.50 |
2.83 |
0.35 |
63 |
| |
|
95.10 |
95.60 |
0.50 |
1.04 |
0.25 |
67 |
| |
|
165.90 |
166.40 |
0.50 |
1.33 |
0.25 |
115 |
| |
|
179.60 |
180.10 |
0.50 |
1.61 |
0.46 |
124 |
| |
|
194.20 |
194.95 |
0.75 |
1.83 |
0.61 |
134 |
| PSP-26-003 |
|
83.60 |
84.10 |
0.50 |
2.98 |
0.35 |
66 |
| |
|
145.15 |
145.65 |
0.50 |
2.58 |
0.39 |
113 |
| |
|
169.35 |
171.25 |
1.90 |
4.93 |
1.34 |
133 |
| |
Including |
170.20 |
170.75 |
0.55 |
16.15 |
|
|
| |
|
183.00 |
184.00 |
1.00 |
1.20 |
0.77 |
144 |
| |
Including |
183.00 |
183.50 |
0.50 |
2.27 |
|
|
| |
|
187.50 |
191.00 |
3.50 |
1.12 |
2.76 |
148 |
| |
Including |
187.50 |
189.00 |
1.50 |
1.17 |
|
|
| |
and |
190.00 |
190.50 |
0.50 |
3.45 |
|
|
| |
|
294.10 |
299.60 |
5.50 |
1.03 |
4.13 |
235 |
| |
Including |
299.10 |
299.60 |
0.50 |
8.10 |
|
|
| |
|
329.00 |
334.00 |
5.00 |
1.10 |
3.97 |
262 |
| |
Including |
331.25 |
331.75 |
0.50 |
7.78 |
|
|
| |
|
367.00 |
379.40 |
12.40 |
1.46 |
10.31 |
295 |
| |
Including |
370.50 |
371.50 |
1.00 |
15.40 |
|
|
| |
and |
373.60 |
374.10 |
0.50 |
2.02 |
|
|
| |
|
395.80 |
396.30 |
0.50 |
1.18 |
0.38 |
313 |
| |
|
411.10 |
417.70 |
6.60 |
1.09 |
5.07 |
326 |
| |
Including |
412.10 |
412.60 |
0.50 |
1.05 |
|
|
| |
and |
412.60 |
413.10 |
0.50 |
1.11 |
|
|
| |
and |
413.10 |
413.60 |
0.50 |
6.22 |
|
|
| |
and |
413.60 |
414.20 |
0.60 |
1.89 |
|
|
| |
and |
415.20 |
415.70 |
0.50 |
1.47 |
|
|
| |
and |
415.70 |
416.20 |
0.50 |
1.32 |
|
|
| |
|
419.20 |
420.30 |
1.10 |
1.07 |
0.60 |
330 |
| |
Including |
419.70 |
420.30 |
0.60 |
1.80 |
|
|
| |
and |
430.10 |
430.60 |
0.50 |
2.30 |
0.09 |
338 |
| |
|
439.30 |
442.20 |
2.90 |
1.00 |
2.33 |
345 |
| |
Including |
439.30 |
440.00 |
0.70 |
1.04 |
|
|
| |
and |
440.50 |
441.15 |
0.65 |
2.68 |
|
|
| |
and |
474.90 |
475.40 |
0.50 |
2.26 |
0.32 |
368 |
| |
|
478.50 |
479.00 |
0.50 |
1.53 |
0.43 |
370 |
| |
|
505.85 |
506.35 |
0.50 |
1.53 |
0.41 |
386 |
| |
|
533.50 |
534.00 |
0.50 |
6.14 |
0.29 |
402 |
| PSP-26-004 |
|
110.40 |
115.00 |
4.60 |
95.93 |
3.25 |
71 |
| |
Including |
112.30 |
112.80 |
0.50 |
873.00 |
|
|
| |
and |
113.80 |
115.00 |
1.20 |
3.77 |
|
|
| PSP-26-005 |
|
55.05 |
58.60 |
3.55 |
1.08 |
1.91 |
42 |
| |
Including |
55.05 |
55.60 |
0.55 |
4.67 |
|
|
| |
and |
58.10 |
58.60 |
0.50 |
2.33 |
|
|
| |
|
76.85 |
79.05 |
2.20 |
3.11 |
1.07 |
59 |
| |
Including |
77.35 |
78.00 |
0.65 |
2.77 |
|
|
| |
and |
78.00 |
79.05 |
1.05 |
4.58 |
|
|
| |
and |
135.35 |
135.85 |
0.50 |
1.05 |
0.45 |
101 |
| |
|
194.00 |
194.50 |
0.50 |
1.12 |
0.32 |
147 |
| |
|
227.60 |
228.20 |
0.60 |
1.10 |
0.10 |
172 |
| |
|
241.50 |
242.00 |
0.50 |
1.24 |
0.26 |
182 |
| |
|
294.00 |
294.50 |
0.50 |
2.17 |
0.45 |
224 |
| |
|
312.75 |
313.75 |
1.00 |
1.03 |
0.89 |
239 |
| |
Including |
312.75 |
313.25 |
0.50 |
1.04 |
|
|
| |
and |
313.25 |
313.75 |
0.50 |
1.02 |
|
|
| |
|
320.00 |
321.00 |
1.00 |
1.33 |
0.94 |
244 |
| |
|
402.40 |
402.90 |
0.50 |
1.17 |
0.43 |
306 |
| |
|
412.20 |
413.30 |
1.10 |
1.43 |
0.72 |
314 |
| |
Including |
412.20 |
412.80 |
0.60 |
1.82 |
|
|
| |
|
414.50 |
416.45 |
1.95 |
1.04 |
1.05 |
315 |
| |
Including |
415.75 |
416.45 |
0.70 |
2.34 |
|
|
| |
|
522.30 |
523.20 |
0.90 |
1.63 |
0.52 |
384 |
| PSP-26-006 |
|
139.70 |
140.20 |
0.50 |
1.05 |
0.45 |
104 |
| |
|
161.00 |
161.50 |
0.50 |
1.16 |
0.29 |
121 |
| |
|
251.60 |
252.10 |
0.50 |
20.20 |
0.35 |
194 |
| |
|
293.60 |
294.60 |
1.00 |
10.21 |
0.77 |
227 |
| |
Including |
293.60 |
294.10 |
0.50 |
20.30 |
|
|
| |
|
315.50 |
316.50 |
1.00 |
1.82 |
0.94 |
243 |
| |
Including |
316.00 |
316.50 |
0.50 |
3.36 |
|
|
| |
and |
323.50 |
324.00 |
0.50 |
1.86 |
0.35 |
249 |
| |
|
468.50 |
470.00 |
1.50 |
4.86 |
1.27 |
361 |
| |
Including |
468.50 |
469.00 |
0.50 |
11.50 |
|
|
| |
and |
469.50 |
470.00 |
0.50 |
3.06 |
|
|
| |
|
476.50 |
477.00 |
0.50 |
1.33 |
0.43 |
366 |
| |
|
499.00 |
499.50 |
0.50 |
1.22 |
0.43 |
383 |
| |
|
509.90 |
510.90 |
1.00 |
1.15 |
0.42 |
392 |
| |
Including |
510.40 |
510.90 |
0.50 |
1.41 |
|
|
| |
|
513.70 |
514.50 |
0.80 |
2.25 |
0.34 |
395 |
| PSP-26-007 |
|
25.80 |
30.30 |
4.50 |
2.30 |
3.95 |
17 |
| |
Including |
25.80 |
26.30 |
0.50 |
1.73 |
|
|
| |
and |
27.30 |
27.80 |
0.50 |
5.62 |
|
|
| |
and |
29.30 |
29.80 |
0.50 |
12.25 |
|
|
| |
and |
29.80 |
30.30 |
0.50 |
1.09 |
|
|
| |
|
74.05 |
74.55 |
0.50 |
1.05 |
0.32 |
44 |
| |
|
80.05 |
80.55 |
0.50 |
1.81 |
0.43 |
46 |
| |
|
112.50 |
113.00 |
0.50 |
2.23 |
0.14 |
62 |
| |
|
165.35 |
167.00 |
1.65 |
1.35 |
0.56 |
90 |
| |
Including |
166.00 |
167.00 |
1.00 |
2.00 |
|
|
| |
|
174.90 |
176.80 |
1.90 |
1.19 |
0.80 |
95 |
| |
Including |
174.90 |
175.40 |
0.50 |
1.98 |
|
|
| |
and |
175.40 |
175.90 |
0.50 |
2.37 |
|
|
| |
|
216.35 |
216.85 |
0.50 |
2.35 |
0.40 |
116 |
| |
|
266.00 |
266.85 |
0.85 |
1.17 |
0.43 |
143 |
| |
|
332.05 |
338.55 |
6.50 |
1.54 |
3.08 |
184 |
| |
Including |
334.25 |
335.00 |
0.75 |
1.16 |
|
|
| |
and |
335.00 |
335.50 |
0.50 |
2.29 |
|
|
| |
and |
336.00 |
336.75 |
0.75 |
9.46 |
|
|
| PSP-26-008 |
|
57.15 |
57.65 |
0.50 |
1.40 |
0.25 |
32 |
| |
|
215.50 |
216.00 |
0.50 |
1.11 |
0.35 |
122 |
| |
|
222.10 |
223.25 |
1.15 |
1.74 |
0.94 |
127 |
| |
Including |
222.10 |
222.75 |
0.65 |
2.91 |
|
|
| |
and |
226.70 |
227.20 |
0.50 |
3.57 |
|
|
| PSP-26-009 |
|
172.45 |
175.45 |
3.00 |
1.35 |
2.16 |
142 |
| |
Including |
172.45 |
172.95 |
0.50 |
7.38 |
|
|
| |
|
381.55 |
383.20 |
1.65 |
2.13 |
0.92 |
311 |
| |
Including |
381.55 |
382.20 |
0.65 |
1.67 |
|
|
| |
and |
382.20 |
382.70 |
0.50 |
4.75 |
|
|
| |
|
388.95 |
389.50 |
0.55 |
15.20 |
0.35 |
317 |
| |
|
399.95 |
400.45 |
0.50 |
1.58 |
0.32 |
326 |
| |
|
407.65 |
413.10 |
5.45 |
3.17 |
3.67 |
334 |
| |
Including |
409.40 |
409.90 |
0.50 |
9.52 |
|
|
| |
and |
409.90 |
410.50 |
0.60 |
19.30 |
|
|
| |
and |
410.50 |
411.00 |
0.50 |
1.22 |
|
|
| |
|
461.55 |
464.35 |
2.80 |
1.72 |
1.98 |
377 |
| |
Including |
462.45 |
462.95 |
0.50 |
9.06 |
|
|
| PSP-26-012 |
No Significant Assays |
|
|
|
|
| PSP-26-011 |
|
41.50 |
53.50 |
12.00 |
1.30 |
6.88 |
27 |
| |
Including |
41.50 |
42.20 |
0.70 |
9.92 |
|
|
| |
and |
45.50 |
46.00 |
0.50 |
3.75 |
|
|
| |
and |
46.50 |
47.00 |
0.50 |
6.19 |
|
|
| |
and |
50.75 |
51.40 |
0.65 |
1.50 |
|
|
| |
and |
53.00 |
53.50 |
0.50 |
3.63 |
|
|
| |
|
101.50 |
102.85 |
1.35 |
2.30 |
1.07 |
57 |
| |
Including |
101.50 |
102.00 |
0.50 |
1.65 |
|
|
| |
and |
102.00 |
102.85 |
0.85 |
2.69 |
|
|
| |
|
313.80 |
315.05 |
1.25 |
4.18 |
1.11 |
180 |
| |
Including |
313.80 |
314.45 |
0.65 |
1.44 |
|
|
| |
and |
314.45 |
315.05 |
0.60 |
7.14 |
|
|
| |
|
319.00 |
320.00 |
1.00 |
2.35 |
0.71 |
183 |
| |
|
325.00 |
328.00 |
3.00 |
1.36 |
2.30 |
187 |
| |
Including |
325.00 |
326.00 |
1.00 |
1.07 |
|
|
| |
and |
327.00 |
328.00 |
1.00 |
2.95 |
|
|
| |
|
382.25 |
383.00 |
0.75 |
1.50 |
0.57 |
222 |
| PSP-26-012 |
No Significant Assays |
|
|
|
| |
|
11.00 |
12.50 |
1.50 |
1.41 |
1.15 |
7 |
| |
Including |
11.00 |
11.50 |
0.50 |
3.49 |
|
|
| |
|
207.25 |
208.25 |
1.00 |
2.02 |
0.79 |
124 |
| |
Including |
207.25 |
207.75 |
0.50 |
3.49 |
|
|
| |
|
234.00 |
239.50 |
5.50 |
1.13 |
4.21 |
141 |
| |
Including |
234.00 |
234.50 |
0.50 |
1.07 |
|
|
| |
|
238.00 |
240.50 |
2.50 |
1.09 |
1.77 |
143 |
| |
Including |
238.50 |
239.00 |
0.50 |
2.28 |
|
|
| |
and |
239.00 |
239.50 |
0.50 |
2.74 |
|
|
| PSP-26-014 |
|
97.30 |
97.85 |
0.55 |
1.30 |
0.48 |
75 |
| |
|
99.00 |
103.00 |
4.00 |
1.01 |
3.46 |
78 |
| |
Including |
100.00 |
100.65 |
0.65 |
1.33 |
|
|
| |
and |
101.50 |
103.00 |
1.50 |
1.87 |
|
|
| |
|
108.80 |
111.45 |
2.65 |
1.34 |
1.90 |
85 |
| |
Including |
108.80 |
109.30 |
0.50 |
3.55 |
|
|
| |
and |
110.80 |
111.45 |
0.65 |
2.31 |
|
|
| |
|
115.00 |
116.00 |
1.00 |
1.24 |
0.50 |
90 |
| |
|
205.00 |
206.00 |
1.00 |
3.39 |
0.71 |
162 |
| |
Including |
205.00 |
205.50 |
0.50 |
6.51 |
|
|
| |
|
230.50 |
234.50 |
4.00 |
2.79 |
2.95 |
184 |
| |
Including |
233.10 |
234.00 |
0.90 |
11.55 |
|
|
| |
|
258.65 |
261.50 |
2.85 |
1.20 |
1.63 |
205 |
| |
Including |
260.00 |
261.50 |
1.50 |
2.16 |
|
|
| |
|
603.00 |
603.50 |
0.50 |
1.74 |
0.35 |
415 |
| |
|
|
|
|
|
|
|
TABLE 2: Surface DD collar locations, orientations, and max depths.
| Drillhole
ID |
Easting (UTM
Zn 10N) |
Northing (UTM
Zn 10N) |
Elevation
(m) |
Depth
(m) |
Collar
Dip |
Collar
Azimuth |
| PSP-26-001 |
601525 |
5876998 |
1719 |
603.70 |
-45 |
125 |
| PSP-26-002 |
601796 |
5876670 |
1755 |
502.20 |
-45 |
125 |
| PSP-26-003 |
601585 |
5876904 |
1721 |
612.00 |
-45 |
125 |
| PSP-26-004 |
601881 |
5876622 |
1750 |
498.00 |
-45 |
125 |
| PSP-26-005 |
601563 |
5876859 |
1721 |
657.00 |
-45 |
125 |
| PSP-26-006 |
601282 |
5876968 |
1675 |
542.00 |
-45 |
125 |
| PSP-26-007 |
601968 |
5876571 |
1737 |
345.00 |
-45 |
125 |
| PSP-26-008 |
602061 |
5876515 |
1717 |
277.75 |
-45 |
125 |
| PSP-26-009 |
601436 |
5876996 |
1699 |
525.00 |
-45 |
125 |
| PSP-26-010 |
601931 |
5876700 |
1735 |
74.50 |
-45 |
125 |
| PSP-26-011 |
602056 |
5876519 |
1718 |
620.80 |
-45 |
125 |
| PSP-26-012 |
601629 |
5876769 |
1728 |
36.00 |
-45 |
125 |
| PSP-26-013 |
601932 |
5876700 |
1735 |
435.00 |
-45 |
125 |
| PSP-26-014 |
601627 |
5876769 |
1728 |
734.30 |
-45 |
125 |
| |
|
|
|
|
|
|
ABOUT THE PROSERPINE PROSPECT
The Proserpine Mountain ("Proserpine") prospect area represents a roughly 4 km long post-mineralization
fault-bound prospective strike length identified through detailed surface mapping and surface geochemical sampling approximately 7 km
along strike to the southeast of the Company’s permitted, 100%-owned Cariboo Gold Project, located in central British Columbia.
Mineralization style and controls observed at Proserpine appear to be similar to those observed in the Cariboo Gold deposit area, with
high-grade gold intercepts associated with quartz-pyrite to polymetallic (pyrite+/-galena+/-arsenopyrite) quartz veins. Less than half
the strike-length of the Proserpine has been drill tested to date, with the current campaign focused on following up on promising preliminary
results from the 2019-2020 drilling campaigns at the central southeast limits of the prospect area (Proserpine Southeast). An aggregate
total of 10,497 metres of exploration drilling was completed by the Company at the Proserpine regional prospect between 2018 and 2020,
not including new drilling contained herein.
ABOUT THE CARIBOO GOLD PROJECT
The Cariboo Gold Project is a permitted, 100%-owned feasibility-stage project located in the historic Wells-Barkerville
mining camp of central British Columbia, Canada. Spanning approximately 186,740 hectares, the Company's land package includes 443 mineral
titles and covers an area that extends approximately 77-kilometres from northwest to southeast. In late 2024, the Project was granted
the Mines Act and Environmental Management Act (British Columbia) permits, marking the successful completion of the permitting process
for key approvals, solidifying the Project's shovel-ready status.
The Cariboo Gold Project hosts probable mineral reserves of 2.071 million ounces of contained Au (17,815 kt grading
3.62 g/t Au); measured mineral resources of 8,000 ounces of contained Au (47 kt grading 5.06 g/t Au); indicated mineral resources of 1.604
million ounces of contained Au (17,332 kt grading 2.88 g/t Au); and inferred mineral resources of 1.864 million ounces of contained Au
(18,774 kt grading 3.09 g/t Au). Mineral resources are reported exclusive of mineral reserves. Mineral resources that are not mineral
reserves do not have demonstrated economic viability. The reader is cautioned that inferred mineral resources have a greater degree of
uncertainty than indicated mineral resources and must not be converted to mineral reserves; it is reasonably expected, though not guaranteed,
that the majority of inferred mineral resources could be upgraded to indicated mineral resources with continued exploration.
Technical Reports
Scientific and technical information relating to the Cariboo Gold Project and the 2025 feasibility study on the Cariboo
Gold Project is supported by the technical report, titled "NI 43-101 Technical Report, Feasibility Study for the Cariboo Gold Project,
District of Wells, British Columbia, Canada" dated June 11, 2025 (with an effective date of April 25, 2025) (the "Cariboo Technical
Report").
For readers to fully understand the information in the Cariboo Technical Report, reference should be made to the full
text of the Cariboo Technical Report in its entirety, including all assumptions, parameters, qualifications, limitations and methods therein.
The Cariboo Technical Report is intended to be read as a whole, and sections should not be read or relied upon out of context. The Cariboo
Technical Report was prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects
("NI 43-101") and is available electronically on SEDAR+ (www.sedarplus.ca) and on EDGAR (www.sec.gov) under Osisko Gold's
issuer profile and on the Company's website at www.osiskogold.ca.
Qualified Persons
The scientific and technical information contained in this news release has been reviewed, verified and approved by
Scott Smith, P. Geo., Vice President, Exploration of Osisko Gold, a "qualified person" within the meaning of NI 43-101. Verification includes
core photo and three-dimensional review of logged drillhole data and assays consistent with the Company's standard procedures.
The exploration results disclosed in this news release are based on incomplete data and are preliminary in nature.
There are no known drilling, sampling, recovery, or other factors that could materially affect the accuracy or reliability of the data;
however, readers are cautioned that additional drilling and sampling may result in materially different results than those presented herein.
Quality Assurance (QA) – Quality Control (QC)
HQ and NQ diameter drill core is cut (halved) on site at the Cariboo Project subsequent to QAQC checks for logging
and sampling errors. Quality control (QC) samples are inserted at regular intervals in the sample stream, including blanks and reference
materials with all sample shipments to monitor laboratory performance. Samples are bagged, labelled, sealed with numbered security tags,
and transported to the laboratory under secure chain of custody procedures.
All drill core samples are submitted to ALS Geochemistry's analytical facility in North Vancouver, British Columbia
for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 standard for gold assays, and all analytical methods
include quality control materials at set frequencies with established data acceptance criteria. The entire sample is crushed, and 250
grams is pulverized. Analysis for gold is by 50 gram fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01
ppm and upper limit of 100 ppm. Samples with gold assays greater than 100 ppm are re-analyzed by fire-assay with gravimetric finish (upper
limit 10,000 ppm). Select samples containing visible gold and/or cosalite are flagged during logging for an additional 1,000-gram screen
metallic fire assay to ensure accurate quantification of any coarse fraction. All samples are also analyzed using a 48 multi-elemental
geochemical package by a 4-acid digestion, followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) and Inductively
Coupled Plasma Mass Spectroscopy (ICP-MS).
| |
ABOUT OSISKO
GOLD GROUP INC.
Osisko Gold Group Inc. is a continental North American gold development company focused on past producing
mining camps with district-scale potential. The Company's objective is to become an intermediate gold producer through the development
of its flagship, fully permitted, 100%-owned Cariboo Gold Project, located in central British Columbia, Canada. Its project pipeline is
complemented by the Tintic Project, located in the historic East Tintic mining district in Utah, U.S.A., a brownfield property with significant
exploration potential, extensive historical mining data, and access to established infrastructure. Osisko Gold is focused on developing
long-life mining assets in mining-friendly jurisdictions while maintaining a disciplined approach to capital allocation, development risk
management, and mineral inventory growth.
For further information, visit our website at www.osiskogold.ca
or contact:
|
|
| |
Sean Roosen Chairman
and CEO Email: sroosen@osiskogold.ca Tel: +1 (514) 940-0685 |
Philip Rabenok Vice
President, Investor Relations Email: prabenok@osiskogold.ca Tel: +1 (437) 423-3644
|
|
| |
|
|
|
CAUTION REGARDING FORWARD-LOOKING STATEMENTS
This news release contains "forward-looking information" (within the meaning of applicable Canadian securities
laws) and "forward-looking statements" (within the meaning of the U.S. Private Securities Litigation Reform Act of 1995, as amended) (collectively,
"forward-looking statements"). Such forward-looking statements are identified with words such as "may", "will", "would", "could", "anticipate",
"believe", "expect", "plan", "intend", "potential", "estimate", "propose", "project", "outlook", "foresee", "objective", "strategy", variants
of these words or the negative or comparable terminology, as well as terms usually used in the future and the conditional. Information
contained in forward-looking statements is based upon certain material assumptions that were applied in drawing a conclusion or making
a forecast or projection, including the assumptions, qualifications, limitations or statements pertaining to: the utility and significance
of the exploration drilling at the Proserpine regional target and the results and interpretation thereof; the presence and continuity
of an emerging gold mineralized system at Proserpine exhibiting similarities to the Cariboo Gold deposit; the potential for open pit mining
methods at Proserpine based on mineralization characteristics observed to date; the significance and interpretation of drill intercepts
and the ability to expand the mineralized footprint at Proserpine; the planned resumption and continuation of the drilling program at
Proserpine; the prospectivity of exploration in targets outside of currently defined mineral reserves and/or mineral resources; the assumption
that a comparison of the strike length and width of the currently defined Cariboo Gold deposit to the area tested to date at the Proserpine
exploration target is meaningful and indicative of exploration potential, which has not been demonstrated; the assumption that further
exploration at Proserpine will yield results (if any) comparable to those at the Cariboo Gold deposit; the interpretation and accuracy
of spatial geometries, geological structure and local variability modeling and assumptions; the results (if any) of further exploration
work and ability of the Company to define mineral resources at Proserpine; the ability of exploration work (including drilling and sampling)
to accurately predict mineralization; the ability of the Company to complete its exploration objectives in the timing contemplated and
within expected costs (if at all); assumptions, qualifications and parameters underlying the Cariboo Technical Report (including, but
not limited to, the mineral resources, mineral reserves, production profile, mine design and project economics); the ability of the Company
to achieve the estimates outlined in the Cariboo Technical Report in the timing contemplated (if at all); the future development and operations
at the Cariboo Gold Project; management's perceptions of historical trends, current conditions and expected future developments; the utility
and significance of historic data, including the significance of the district hosting past producing mines; the ability to adapt to changes
in gold prices, estimates of costs, estimates of planned exploration and development expenditures; the Company's strategy and objectives
relating to the Cariboo Gold Project as well as its other projects; the assumptions, qualifications and limitations relating to the Cariboo
Gold Project being permitted; the exploration potential and prospectivity (if any) of its properties; the Company's anticipated name change
and trading of its securities under its updated stock ticker symbols (including timing thereof); regulatory framework remaining defined
and understood as well as other considerations that are believed to be appropriate in the circumstances, and any other information herein
that is not a historical fact may be "forward looking information". Actual results could differ materially due to a number of factors,
including, without limitation: the change in the Company's trading symbols and the marketplace effective date of such changes, risks relating
to third-party approvals, including the issuance of permits by governments, capital market conditions and the Company's ability to access
capital on terms acceptable to the Company for the contemplated exploration and development at the Company's properties; risks related
to the exploration, development and operation of the Cariboo Gold Project; risks related to geological modeling and resource estimation;
health, safety and security incidents; regulatory delays or changes in regulatory framework and applicable laws; labour shortages or disputes;
general economic and market conditions and business conditions in the mining industry; fluctuations in commodity and currency exchange
rates; changes in regulatory framework and applicable laws, as well as those risks and factors disclosed in the Company's most recent
annual information form, financial statements and management's discussion and analysis as well as other public filings on SEDAR+ (www.sedarplus.ca)
and on EDGAR (www.sec.gov).
Although the Company believes the expectations conveyed by the forward-looking statements are reasonable based
on information available as of the date hereof, no assurances can be given as to future results, levels of activity and achievements.
The Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or
results or otherwise, except as required by law. Forward-looking statements are not guarantees of performance and there can be no assurance
that these forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those
anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies
of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission
or other regulatory authority has approved or disapproved the information contained herein.
Photos accompanying this announcement are available at:
https://www.globenewswire.com/NewsRoom/AttachmentNg/b721d582-4327-45f9-99b0-7912b2781c4a
https://www.globenewswire.com/NewsRoom/AttachmentNg/e0bd2556-1581-43c4-9697-f627ac4a198c
https://www.globenewswire.com/NewsRoom/AttachmentNg/703af41e-b822-4f85-82b7-53a6e1821143
https://www.globenewswire.com/NewsRoom/AttachmentNg/85a67a99-e19d-4052-9c59-366164458ce5