Petrobras outlines $122B investment plan for 2027–2031
Sentiment and the balance of points
Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.
PETROBRAS (PBR) presented its 2027–2031 business plan with US$122 billion in total capital expenditure, with more than 70% concentrated in exploration and production. The portfolio includes US$99 billion in base projects, US$14 billion in projects under implementation targeted for the plan and US$9 billion under evaluation; projections are subject to variation of ±5%. Operating cash flow is projected at US$44 billion in 2027, US$45 billion in 2028 and US$47 billion annually from 2029 through 2031.
The plan retains a dividend formula of 45% of free cash flow and sets a gross-debt limit below US$75 billion, a US$65 billion target and minimum cash of US$6 billion. It projects total production volume through 2050 at 25% above the BP 2025–2029 plan and installed refinery processing capacity of 2,173 kbpd by 2031, including a 293 kbpd increase during 2027–2031. Effective capacity use depends on market analyses and conditions. Petrobras says its investments have the potential to generate and sustain 325,000 direct and indirect jobs, while its activities are expected to generate around R$1.6 trillion in tax payments over 2027–2031.
Filing Explained
Petrobras’s November 23 Form 6-K furnishes its 2027–2031 plan; inclusion does not authorize execution: the base category may include unsanctioned projects, and capital projects require positive NPV in all three scenarios before execution approval.
Key Figures
Key Terms
Free Cash Flow financial
Net Present Value financial
FPSO technical
CCUS technical
HEFA technical
BESS technical
FAQ
AI-generated questions and answers. How Rhea-AI works. Not financial advice.
How much EBITDA does Petrobras (PBR) expect from additional S10 diesel production?
How much of Petrobras' (PBR) R&D&I budget is for low-carbon projects?
AI-generated analysis. How Rhea-AI works. Not financial advice.
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 6-K
Report of Foreign Private
Issuer
Pursuant to Rule 13a-16 or 15d-16 of the
Securities Exchange Act of 1934
For the month of November, 2026
Commission File Number 1-15106
PETRÓLEO BRASILEIRO S.A. – PETROBRAS
(Exact name of registrant as specified in its charter)
Brazilian Petroleum Corporation – PETROBRAS
(Translation of Registrant's name into English)
Avenida Henrique Valadares, 28 – 9th floor
20231-030 – Rio de Janeiro, RJ
Federative Republic of Brazil
(Address of principal executive office)
Indicate by check mark whether the registrant files or will file annual reports under cover Form 20-F or Form 40-F.
Form 20-F ___X___ Form 40-F _______
Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934.
Yes _______ No___X____
Disclaimer Byreceiving thesematerials and/or attending thispresentation, youagreetobeboundbythefollowingterms andconditions and acknowledge thestatements below. Neither the Company nor any of its affiliates, directors, officers, agents or employees shall have any liability whatsoever for any loss or damage arising from any use of these materials or their contents or otherwise arising in connection with these materials or the presentation. No recipient of these materials or attendee at this presentation should construe the contents of these materials as legal, tax, accounting or investment advice or a recommendation to buy, hold or sell any security, or an offer to sell or a solicitation of offers to purchase any security. Each recipient and attendee should consult its own counsel and tax and financial advisors as to legal and related matters concerning thematters described herein. These materials contain non-IFRS financial measures used by the Company’s management when evaluating results of operations. The Company’s management believes these measures alsoprovide useful comparisons of current results of operations with past and future periods. Non-IFRS financial measures do not have any standardized meaning and are therefore unlikely to be comparable to similar measures presented by other companies. These materials may contain forward-looking statements within the meaning of Section 27A of the US Securities Act of 1933, as amended, and Section 21E of the US Securities Exchange Act of 1934, as amended, that reflect the current views and/or expectations of the Company and its management with respect to its performance, business and future events. Forward-looking statements include, without limitation, any statement that may predict, forecast, indicate or imply future results, performance or achievements, and may contain words like “believe”, “anticipate”, “expect”, “envisages”, “will likely result”, or any other words or phrases of similar meaning.Such statements are subject to anumber of risks, uncertainties and assumptions. Wecaution you that a number of important factors could cause actual results to differ materially from the plans, objectives, expectations, estimates and intentions expressed in this presentation. Additional factors that could cause actual results to differ are described under "Risk Factors" on Form 20-F, under “Risk Factors” section of Formulário de Referência, and in its other documents filed by the Company with the SEC and the CVM.Forward-looking statements speak only as of the date they are made, and the Company undertakes no obligation to update them, except as required by applicable law. In no event shall the Company or any of its affiliates, directors, officers, agents or employees be liable to any third party for any investment or business decision made or action taken in reliance on the information and statements contained in this presentation or for any consequential, special or similar damages. CAUTIONARY STATEMENT — We present certain data in this presentation, such as oil and gas resources and reserves, that are not prepared in accordance with the United States Securities and Exchange Commission (SEC) guidelines under Subpart 1200 to Regulation S-K, and are not disclosed in documents filed with the SEC, because such resources and reserves do not qualify as proved, probable or possible reserves under Rule 4 10(a) of Regulation S-X. 2 Agenda Agenda 1. Introduction 2. Market Outlook 3. Financial Strategy 4. Exploration and Production 5. Refining, Transportation and Marketing 6. Gas and Low Carbon Energies 7. Climate Change and Decarbonization 8. Engineering, Technology and Innovation 9. Supplemental Information › Environmental, Social and Governance › Corporate WAGNERFelicio Our journey We are charting the path of the just energy transition as a leading company, advancing gradually and responsibly, with the ambition of maintaining our relevance in Brazil’s energy mix, expanding the share of renewable sources and contributing to Brazil’s energy security and sustainable development VISION VALUES PURPOSE To be the best diversified and integrated energy company in value generation, building a more sustainable world, reconciling the focus on oil and gas with diversification into low carbon businesses (including petrochemicals, fertilizers and biofuels), sustainability, safety, respect for the environment, and total attention to people >Care for people > Integrity >Sustainability >Innovation >Commitment to Petrobras and Brazil To provide energy that ensures prosperity in an ethical, fair, safe and competitive manner 5 The Petrobras of the future We reaffirm our key choices Focus on oil and gas, with economic and environmental resilience Replenishment of oil and gas reserves, creating value for society and shareholders Expansion of the industrial facilities, monetizing domestic oil and with increased supply of low carbon products Ambition to achieve operational net zero emissions Leadership in the just energy transition 6 Our growth reflects the ambition to sustain our relevance in Brazil’s energy supply 2022 2031 2050 2.6 EJ 14 1.7 EJ 31% 4.3 EJ Exajoules = Exports Oil and gas 16 27% 4.3 EJ Exajoules Oil and gas 4% 0.7 EJ Low Carbon 21 1.4 EJ 22% 4.6 EJ Exajoules Source: IEA and Petrobras. Notes: - In 2031, Petrobras' total Low Carbon project portfolio accounts for 4% (0.7 EJ) of the energy supply.- All oil and oil products in the domestic market in 2050, with a gradual reduction in exports. 9% 1.9 EJ Oil and gas Low Carbon 7- The Low Carbon share in 2031 and 2050 includes the contribution of this segment's projects plus future efforts in new projects to achieve the energy ambition. Petrobras growth is shared with society 2027 - 2031 Our investments have the potential to generate and sustain 325 thousand direct and indirect jobs They represent 5% of total investments in Brazil in the period Our activities will generate tax payments to the federal government, states and municipalities of around R$ 1.6 trillion 8 PATRÍCIASilva LUCASSu Projections updated in 2026 point to higher long-term oil demand Resumption of exploration investments: energy security and expectations of higher demand OIL DEMAND PROJECTIONS: 2024 vs. 2026 MMbpd 120 100 80 60 40 2024 projection 100 20 0 2026 projection 2010 EXPLORATION SPENDING US$ billion SPENDING PEAK Forecaster ranges* 114 70 64 29 PRE PANDEMIC PROJECTION Slight increase in exploration investment through 2030 12 33 8.7 9.4 9.1 9.3 9.9 2020 2030 2040 2050 *Forecaster range: IEA WEO 2025 (CP, SP), IHS 2025.07 (ACCS, Discord, Green Rules, Inflections, Multitech), S&P Platts 2025.11, WoodMackenzie 2026.07, OPEC WOO 2026, Rystad (+Sigma, Mean,-Sigma) 2026.07, BP (Current Trajectory and Below 2o), Equinor (Walls, Arches, Plazas and Silos), ExxonMobil 2026,Total 2025(Momentum,Rupture), Shell2026(Archipelago, Horizon andSurge). Figures obtained from the companies' respective Long-Term Outlooks. In some cases, projections originally presented in energy units were converted into barrels per day(bpd) byPetrobras. 2012 to 2014 2018 to 2019 2020 to 2023 2024 2025 2026 2027 to 2030 Source: S&P Global Commodity Insights (April/2026). 10 Uncertainty about the pace of the energy transition remains, but the set of scenarios points to a slowdown CO2e EMISSIONS SCENARIOS IN 2050 Pace of transition 2022: 37 GtCO2 eq/year 2024: 38 GtCO2 eq/year 2050 Current projection 24 GtCO2eq/year 2024 projection 16 GtCO2eq/year Pace of the Energy Transition SLOW MODERATE Simple arithmetic average of all projections 11 ACCELERATED The Energy Transition will materialize through the entry of new sources Investment in renewables has remained above investment in traditional sources since 2016 VALUES IN US$ BILLION, REAL TERMS base year 2024 2,702 2,490 2,492 2,493 2,453 45 % 1,209 2,240 2,431 1,262 1,284 1,282 1,288 1,268 1,393 1,630 55 % 3,048 3,231 3,302 2,743 1,871 2,033 2,154 1,493 1,228 1,208 1,211 1,165 972 1,038 1,113 1,177 1,198 1,148 2015 * Estimate. Source: IEA. 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025* Low 65 % 35 % Carbon Fossil Sources 12 The energy transition will respect each nation's strengths: security, resilience and diversification 13 OIL PRODUCTS DEMAND PROFILE Exajoules In Brazil, biofuels will gain more ground in the transport mix, especially in light-duty transport ENERGY MIX % share of each source in primary energy 27% 10% 30% 19% 23% 18% 16% 40% 5% 13% 2024 2050 Coal Oil Natural Gas Renewables Others Oil products Biofuels Compressed NG Electricity Source: IEA (WEO 2025), EPE (BEN 2025) and Petrobras. Source: National Energy Balance (BEN) and Petrobras. Brazil’s energy mix will continue to be much more renewable than the global mix Heavy-duty transport Light-duty transport 13% 19% 18% 1.7 2.3 2.7 86% 73% 69% 2025 2040 2050 38% 46% 43% 2.3 2.5 2.1 60% 47% 43% 2025 2040 2050 34% 22% 10% 10% 51% 65% 2024 2050 Brazil's energy sector emits less greenhouse gas than the world average Brazil accounts for 2.2% of the world's primary energy supply, but only 0.7% of global emissions from this sector Source: UNEP – Emissions GAP Report (2023), IEA WEO 2024, SEEG GWP AR5, 2023 Data. Greenhouse Gas Emissions Land use 7% Industrial process and waste 14% Agriculture and livestock 11% Land use 25% Agriculture and livestock 38% Energy Industrial process and waste Energy 68% 12% 25% 14 Brazil combines a clean energy mix with lower-carbon footprint oil Oil and gas production in Brazil is among the lowest greenhouse gas emitters in the world GREENHOUSE GAS EMISSIONS PER BARREL PRODUCED BY MAJOR PRODUCERS Kilograms of CO2 equivalent per barrel produced – 2025 Data 120 100 80 60 40 20 0 5 9 CO₂ emissions Methane emissions 20 20 37 39 57 63 Weighted average: 32 15 Source: Rystad Energy – The producers listed account for 97.9% of global production. Countries with production above 200 kbpd were selected. Geopolitical conflicts shaped the external environment in 2026 The Hormuz crisis caused an unprecedented shock to energy systems Around 200 assets were affected by the conflict Major disruptions Major disruptions Minor incidents Minor incidents Hormuz Bab al-Mandab Ira n Oil supply disruptions in history Billion barrels Closure of Hormuz (2026) Hormuz (2026) Iranian Revolution (1978-79) Gulf War (1990-91) Arab embargo (1973-74) Iraq War (2003) Iran-Iraq War (1980-81) Libyan Civil War (2011) Venezuela strike (2002-03) Suez Crisis (1956-57) Invasion of Ukraine (2022) Hurricanes Katrina and Rita (2005) Abqaiq-Khurais attack (2019) Hurricane Harvey (2017) Canada wildfires (2016) Mar Apr Iran May Jun Jul Aug Sep Oct 0 Source: World Energy Outlook 2026. 1 2 ~2.8 3 Source: Rystad Energy. 16 Petrobras forecast Volatile price environment Competitiveness across price cycles demonstrates the resilience of our assets In 2026, geopolitical conflicts shaped the external environment, resulting in higher Brent prices and record crack spreads Even so, we have maintained our long-term price view at US$ 70/bbl, with a robust scenario at US$ 50/bbl We will execute our investments in a more favorable scenario, without relaxing capital discipline BP 2027-31 US$/bbl Actual BP 2027-31 BP 2026-30 81 2024 69 2025 * Actual through Sep/30. Source: S&P Global -Platts. Brent 94 * 74 70 70 70 70 70 63 2026 2027 2028 2029 2030 2031 17 JAQUELINE Teixeira Our priority is growth with value generation Along this path, we will preserve financial strength while consistently rewarding our shareholders INVESTMENTS Value US$ 30 billion in OCF vs BP 2026-30 Profitable and resilient investments INVEST WITH DISCIPLINE DIVIDENDS US$ 10 billion in dividends vs BP 2026-30 Formula maintained: 45% x FCF Commitment to our shareholders and to the dividend policy DELIVER CONSISTENT SHAREHOLDER RETURNS DEBT GROSS DEBT LIMIT < US$ 75 billion TARGET • US$ 65 billion MINIMUM CASH • US$ 6 billion US$ 20-25 billion in cash to be allocated Debt under control, seeking balance ENSURE FINANCIAL STRENGTH 19 Note: Considers Total Portfolio. US$ billion Earn-outs3 (0-5) Operating cash flow after taxes and judicial deposits1 Cash flow from investments Ordinary dividends Leasings To be allocated Financial expenses Net borrowings (0-5)2 ASSUMPTIONS 2027 2028 2029 2030 2031 Brent (US$/bbl) 74 70 70 70 70 FX nominal (R$/US$) 5.31 5.35 5.41 5.46 5.50 USA Diesel Crack (US$/bbl) 27 21 21 20 20 USA Gasoline Crack (US$/bbl) 16 14 14 14 14 PROJECTIONS 4 2027 2028 2029 2030 2031 Operational Cash Flow 44 45 47 47 47 Cash Capex 24 24 20 18 15 Leasings 12 12 11 10 9 SENSITIVITIES Change (Δ) OCF impact/year Brent (US$/bbl) 10 ≅US$ 6 billion FX (R$/US$) R$ 0.50 ≅US$ 1 billion Diesel Crack (US$/bbl) 10 ≅US$ 2 billion Gasoline Crack (US$/bbl) 10 ≅US$ 1 billion 230-250 5 -10 50-55 20-25 55-60 100-110 Sources Uses 1Includes cash surplus at the beginning of the period. 2 Net borrowings: financing proceeds, net of amortizations. 3Includes contingent and deferred payments and divestments. 4Projections subject to variation of ±5%. Decommissioning expenses: ≅US$ 11 billion. US$ billion More investments, higher cash generation and more dividends Total Capex of US$ 122 billion 20 Greater efficiency in Capex execution generates more value Risk modeling reflects our capacity to deliver investments and increase production 1 WE DELIVERED INVESTMENTS Capex execution vs Guidance 110% 81% 79% 90% 2022 124% 2023 2024 2025 2026E We improved our investment execution capacity 2 100% Expected 2027-31 Year 1 WE RECALIBRATED RISK ADJUSTMENT Illustrative data Deterministic New risk model Expected execution Previous risk model Year 2 Year 3 Year 4 We plan for greater accuracy in projections Year 5 3 WE PROJECT HIGHER PRODUCTION Oil production (MMbpd) Actual / Projected 2.7 to 2.8 2.4 2.1 2.2 2.2 BP 2026-30 BP 2027-31 2.9 2.9 2.9 2.9 2.9 2.5 2.6 2.7 2.6 2.6 2022 2023 2024 2025 2026E 2027 2028 2029 2030 2031 Over the 2027-2030 period, +430 MM barrels of oil between Plans 21 Our investment portfolio amounts to US$ 122 billion More than 70% of investments concentrated in E&P Total 87 US$ 122 billion 24 8 3 Exploration & Production Gas and Low Carbon Refining, Transportation and Marketing Corporate Under Implementation US$ 83 113 billion 23 4 3 Under Evaluation US$ 9 billion 3 1 4 22 Notes: projections subject to variation of ±5%. Focused on projects that expand cash generation capacity US$ billion Inorganic (1) Current (2) Capital 29.5 7.0 19.7 28.3 2.8 8.0 19.0 1.3 2027 Cash Capex (3) 24 2028 24 Organic Cash Capex 23 23 TOTAL US$ 122 billion 23.8 5.8 16.7 2029 20 19 22.3 1.3 4.9 16.5 2030 18 17 1.0 17.8 3.9 13.6 2031 15 14 0.3 Notes: projections subject to variation of ±5%. (1)Inorganic: recognition of the Atapu and Mero bids (US$ 1.3 bn, cash outflow in 2025), the October/26 permanent bid round (US$ 0.6 bn, cash outflow in 2026) and acquisitions (US$ 5 bn). (2)Current investments are those aimed at maintaining and operating existing assets, without increasing production capacity, including maintenance, replacements, legal compliance and support projects. (3)Mainly excludes leases, geology and geophysics expenses, as well as the cash and accrual mismatch for platforms, materials and equipment. 23 Flexible portfolio for greater resilience Solid governance for project migration, in addition to the recognized governance of approvals TOTAL US$ 122 billion 7% 12% UNDER EVALUATION 9 US$ billion Opportunities UNDER IMPLEMENTATION TARGET 14 US$ billion 81% BASE 99 US$ billion Financeability periodically assessed, in light of cash flow projections and the Company's capital structure, for submission and approval in accordance with project governance(1) Projects with budget approved in the Plan, even if not yet sanctioned Notes: projections subject to variation of ±5%. (1) Capital investment projects are approved only when they show an expected positive NPV in all three scenarios. Exploratory projects (including participation in auctions), current investments (e.g., maintenance), as well as partnerships, follow specific approval procedures. Main migrations (BP 2026-30 vs BP 2027-31) EVALUATION IMPLEMENTATION Búzios 12 REVIT Barracuda and Caratinga Mero Extension Sirius REPAR Medium Oil Products HDT MR2 Vessels 24 Reduced uncertainties result in higher projected investments Main changes vs BP 2026-30 TOTAL US$ billion BP 2026 0.4 Recognition of ANP Auctions US$ 1.9 billion (1) Period adjustment Inflation FX BP 2026-30 Normalized Current Investments Schedule and portfolio adjustments New Projects Improved project execution BP 2027 Note: projections subject to variation of ±5%. (1) Mainly complementary projects and recognition in 2027 of the Atapu and Mero Non-Contracted Areas Auctions (US$ 1.3 bn, cash outflow in 2025) and participation in the PermanentBid Roundin Oct/26 (US$ 0.6 bn, cash outflow in 2026). 25 Profitable projects matured and migrated to implementation Main changes vs BP 2026-30 IMPLEMENTATION US$ billion Recognition of ANP Auctions US$ 1.9 billion 4 2 4-2 3 13 4 91-5 92 113 BP 2026-30 Period adjustment Inflation FX BP 2026-30 Normalized Current Investments Schedule and portfolio adjustments New Projects Projects migrated to Implementation Improved project execution BP 2027-31 (1) Note: projections subject to variation of ±5%. (1) Mainly complementary projects and recognition in 2027 of the Atapu and Mero Non-Contracted Areas Auctions (US$ 1.3 bn, cash outflow in 2025) and participation in the Permanent Bid Round in Oct/26 (US$ 0.6 bn, cash outflow in 2026). 26 E&P remains themain investment focus Accounting for more than 70% of investments under implementation IMPLEMENTATION US$ 113 billion Exploration & Production Refining, Transportation and Marketing Gas and Low Carbon Corporate 29.3 27.4 21.8 19.6 15.1 2027 21.2 6.2 1.3 2028 18.6 6.6 2029 16.4 4.1 2030 15.5 2031 11.4 3.0 1.2 0.7 Cash Capex 24.2 1.0 23.1 0.6 0.6 0.5 0.6 2.7 0.3 0.5 18.0 Sanctioned 88% 79% 15.7 12.2 64% Note: projections subject to variation of ±5%. Sanctioned projects include around US$ 30 billion in current investments. 51% 46% 27 Capex concentrated in 2027 and 2028 to sustain operational performance 2027 and 2028: deliver growth and preserve asset efficiency Cash Capex 2027 | US$ 24.2 billion 2028 | US$ 23.1 billion E&P: FPSOs, wells and tie-ins Búzios 8 to 12, Atapu 2, Sépia 2 and Revit Albacora 1st oil does not mark the end of Capex Complementary projects sustain production and enhance resilience RTM: expansion and HEFA Boaventura, RNEST – Train 2 and UFN-III: start-up expected in 2029 RPBC HEFA (Hydroprocessed Esters and Fatty Acids): start-up expected in 2030 CURRENT INVESTMENTS: efficiency, integrity and reliability E&P: +1 p.p. of efficiency ≈ +30 kbpd Refining: High utilization factor (FUT) → higher-value, more profitable oil products 28 Greater project execution efficiency raises 2027 Capex Main changes vs BP 2026-30 IMPLEMENTATION US$ billion 1.0 4.2 0.8 0.2 2.5 21.0 22.8-0.5 Recognition of ANP Auctions US$ 1.9 billion 0.1 29.3 2027 in BP 2026-30 Inflation FX 2027 Normalized Current Investments Schedule and portfolio adjustments New Projects (1) Projects migrated to Implementation Improved project execution 2027 in BP 2027-31 Note: projections subject to variation of ±5%. (1) Mainly complementary projects and recognition in 2027 of the Atapu and Mero Non-Contracted Areas Auctions (US$ 1.3 bn, cash outflow in 2025) and participation in the Permanent Bid Round in Oct/26 (US$ 0.6 bn, cash outflow in 2026). 29 20,5 21,6 22,2 23,4 23,4 24,1 25,4 20.5 22.2 27.4 1.1 0.6 1.7 0.7 1.3 2.0-0.5 2028 in BP 2026-30 Inflation FX 2028 Normalized Current Investments Schedule and portfolio adjustments New Projects Projects migrated to Implementation Improved project execution 2028 in BP 2027-31 IMPLEMENTATION In 2028, we also migrated new projects and raised current Capex to generate more value Main changes vs BP 2026-30 30 US$ billion Note: Projections subject to variation of ±5% (1) Mainly complementary projects and exploration. (1) High-returnprojects Portfolio resilient to adverse scenarios IRR – AVERAGE NOMINAL INTERNAL RATE OF RETURN IN US$ Exploration & Production 20% Refining, Transportation & Marketing 16% Gas & Low Carbon Energies >12% Note: As of BP 2027–31, rates of return are disclosed in nominal terms, considering inflation of c.2% p.y. In previous plans, rates were expressed in real terms. For E&P, the analysis now considers only projects with 1st oil from 2027 onwards, whereas BP 2026–30 considered projects with 1st oil from 2022 onwards. 31 Flexible capital structure, without compromising debt limits or investment resilience Lower lease debt expands room to optimize the capital structure GROSS DEBT US$ billion Leasings Financial debt GROSS DEBT LIMIT < US$ 75 billion Convergence to US$ 65 billion in 2029 70 43 70 69 68 65 65 38 61 54 57 58 50 41 44 Net debt 26 43 43 65 36 40 25 2025 % of leases linked to FPSOs Brent breakeven (1) 2026E 25 2027 56% US$ 80/bbl 24 2028 53% 25 2029 53% 29 27 2030 51% 29 2031 51% 2028-31 average: US$ 53/bbl Note: figures refer to the Implementation Portfolio. Net debt projections are subject to unforeseen cash allocations. (1) Brent breakeven: oil price needed to honor financial obligations, including dividends, with no net debt addition. 32 Our financial strategy: solid growth and consistent returns Investments Operating Cash Generation Benefits for society as a whole 33 GISELLYCarvalho ROBERTORufino Value generation strategy Fostering capital discipline and cost optimization Delivering production safely, ensuring maximum asset longevity Maximizing value with focus on profitable assets E&P Contributing to increasing natural gas supply Replenishing reserves and exploring new frontiers in Brazil and abroad Decarbonizing our portfolio 35 Production growth unprecedented in the company's history OIL PRODUCTION million bpd | Petrobras Work Interest (WI) | with variation of +/- 4% +26% in production between 2024 and 2026 2.9 Between 2.7 2.8 2.5 2.6 2.9 2.7 2.9 2.9 2.4 2.9 2.6 2.6 Addition of 2.2 2021 2.2 2.1 2022 2023 2.2 2024 430 MILLION BARRELS of oil between Plans (2027-2030 period) 2025 2026 2027 2028 Actual 2026 Outlook BP 26-30 BP 27-31 2029 2030 2031 36 3 pillars are key to delivering a strong production curve, safely and sustainably ¹ Assets that started production by Nov/2022. ² Production Efficiency Index. ³ FPSOs producing above design nameplate capacity: P-70, P-71, P-75, P-77, FPBAR, FPTAM, FPGNB, FPSTB and FPMDC | Increase authorized for: P-78, FPADG | Units planned for increase: P-79, P-80, P-82, P-83, P-84 and P-85. 37 EF100: applied innovation to raise E&P operational efficiency Petrobras strategic program that integrates people, processes and technology to improve the performance of own and leased Exploration and Production assets Program PEOPLE PROCESSES TECHNOLOGY 13 INITIATIVES SPLIT INTO MAINTENANCE AND RELIABILITY 2025 Increase of 1.3 p.p. in the Production Efficiency Index In 2025, solutions associated with Ativo360 and Subsea Integrity were recognized at the ANP Technological Innovation Award 38 OPERATION We have mapped production gain opportunities that can be captured over the coming years BP 2027-31 OIL PRODUCTION AND RISK TUNNEL 2.9 MMbpd 2027 1BSW: Basic sediment and water. 2GOR: Gas-oil ratio. 2028 2029 2030 2031 Opportunities not included in the Guidance • REDUCED UNCERTAINTIES related to pre salt reservoirs, especially regarding the expected increase in BSW and GOR. • CAPACITY INCREASE on platforms not yet in production, especially the 3 new Búzios units starting up in 2027, each with a design capacity of 225 kbpd. • ANTICIPATION of platforms and wells start-up, accelerating ramp-ups. 39 We sustain robust production in BP 2027-31 TOTAL PRODUCTION million boed | Petrobras Work Interest (WI) | with variation of +/- 4% Operated Production1 5.1 3.5 3.1 2.9 5.2 3.7 3.2 2.9 5.2 3.7 3.2 5.2 3.7 5.2 3.7 3.2 2.9 2027 2028 2029 2.9 2030 3.2 2.9 2031 Oil* Commercial gas Non commercial gas Oil and commercial gas Total oil and gas production % Pre-salt² 89% * Oil + NG.L ¹ Besides the government's profit oil from PSA projects, partners’ WIs are also included. ² Five-year average. Government share in operated production² 9% 40 Volume through 2050: +25% vs BP 2025-29 Consistent results from the Strategic Reserve Addition Program turn ambition into production growth DELIVERY of the production curve consistently above plan Revised guidance 3.3 / 3.4 3.0 Total Production(MM boed) 2.8 3.1 STRENGTHENING OF THE PRODUCTION TRAJECTORY Sustaining significant volumes for longer 2025 2026 2027 2031 Actual 2025 ; Guidance 2026 2040 • Management and maximization of reservoir potential • Mapping of new opportunities (complementary wells and Sépia3) • Application of advanced technologies such as intelligent completion, WAG, 4D seismic +25% IN TOTAL PRODUCTION VOLUME BY 2050 2050 Operating assets + Projects BP 2026-30 BP 2027-31 Planned BP 2025-29 Planned 41 Note: Production curves include entire scope of projects portfolio. 4D seismic: information turned into value Monitoring reservoir evolution reduces uncertainties and supports decisions that generate value throughout the life of the assets SEE DECIDE Fluid movement and changes in the reservoir, with seismic data processed on in-house supercomputers (HPC) Well optimization, reservoir management and new projects US$ 3 billion to be invested 24k km² to be acquired CAPTURE VALUE Higher reservoir recovery, lower uncertainty and more value for assets over the next 5 years in 4D seismic 250% average net potential value versus 4D seismic investment It is not just data acquisition. It is turning reservoir knowledge into business value. 42 We continue with relevant investments in E&P BP 2027-31 • Total portfolio of E&P 4.7 10.0 3.4 PN 27-31 86.5 86,5 US$ billion US$ bilhões 20.5 Evaluation Implementation 83.1 Pre-salt Post-salt 51.3 Exploration Others 43 Note: Projections are subject to variation of +/- 5%. E&P Capex under implementation BP 2026-30 vs BP 2027-31 US$ billion 69.2 7 16 43 2.7 3 83.1 69.3 1.5-4.1 10.3 2.8 Recognition of ANP Auctions1 US$ 1.9 billion 4.9-4.1 79,5 10 19 50 5 BP 2026-30 Inflation FX Period Adjustment Pre-salt Normalized BP 2026-30 Post-salt Acquisition of new areas and EXP wells Projects migrated to Implementation Exploration Others Improved project execution Projects postponements BP 2027-31 Note: Projections subject to variation of +/- 5%. 1 Recognition in 2027 of the Atapu and Mero Non-Contracted Areas Auctions (US$ 1.3 bn, cash outflow in 2025) and participation in the Permanent Bid Round in Oct/26 (US$ 0.6 bn, cash outflow in 2026). 44 Portfolio has economic resilience to generate value in challenging price environments ECONOMIC RESILIENCE Our strategy calls for high-return capital investments, approved only with positive NPV in 3 scenarios approx. 2x VALUE NPV (US$) Upside in higher price scenarios Robust Scenario Base Scenario Optimistic Scenario US$ 39/bbl Brent breakeven of major E&P projects¹ 20% Average IRR² of major E&P projects 1 Brent breakeven and average nominalIRR of major E&P segment projects with start-up from 2027 onwards, considering their entire productive life. Prospective portfolio Brent breakeven, which does not consider past investments, of US$ 27/boe in BP 2027-31. 2 As of BP 2027–31, rates of return are disclosed in nominal terms, considering inflation of c.2% p.y. In previous plans, rates were expressed in real terms. 45 Investments in Complementary Projects have been essential to our production growth Complementary projects expand, sustain or recover production from systems already in operation Covering different scopes: • Additional wells and infill drilling • Secondary recovery and reservoir management • Maximizing value of installed infrastructure 1 Producer and injector wells. 2 Capex for drilling, completion and tie-in of complementary wells. ≅100 wells1 offshore With investments in BP 2027-31 ≅US$ 14 Billion Complementary Projects Capex2 BP 2027-31 ≅ 10% of average total production In the 2027-2031 period ≅ 28% Average nominal IRR 46 Lifting Cost in the 1st quartile of industry benchmarks LIFTING COST ~6 US$/boe from 2025 to 2031 TCPO TOTAL COST OF PRODUCED OIL US$/boe 31 DD&A Government take Lifting cost 2027-31 Average PETROBRAS STANDS OUT IN COSTS AND PRODUCTION COMPARED TO PEERS1 35% PETROBRAS % change in production (commercial oil and gas) 2024 – 2026 • boe-10%-10% % change in Cost per barrel (Capex/boe) 2024 – 2026 (US$/boe) Peers Petrobras 20% 47 Source: Wood Mackenzie. 2026 data includes company projections. | ¹Peers: ExxonMobil, Chevron, Shell, TotalEnergies, Equinor and BP. E&P committed to decarbonizing operations Recent improvements are related to energy optimization actions and reduced gas losses ENVIRONMENTAL RESILIENCE 15 Kg CO2e / boe Competitive emissions over the five-year period • Zero routine flaring by 2030 • Reduction in the intensity of methane emissions, reaching 0.20 tCH4/thousand tHC by 2030 • Gold Standard OGMP1 2.0 in methane emissions management E&P GHG2EMISSIONS INTENSITY KgCO2e/boe-25% 19.9 14.8 14.7 15.0 15.0 2015 1OGMP - Oil and Gas Methane Partnership 2 2024 2025 Target 2030 Target 2035 48 Greenhouse gases. We remain the industry leader in organic reserve replacement, at low costs Lowest cost and highest organic reserve replacement among peers¹ 30 Finding and development cost (5-year average, US$/boe) 25 20 15 10 5 0 40 60 80 100 120 Petrobras 140 160 Organic reserve replacement (5-year average, %) Integrated Europeans Majors Petrobras Source: S&P Global Energy, ©2026 by S&P Global Inc. NOCs ¹ Peers: Majors (ExxonMobil, Chevron, Shell, TotalEnergies, Equinor and BP), Integrated europeans (Eni, GALP, Repsol) and NOCS (Ecopetrol, PEMEX, Petrochina). Highest proven reserves in 10 years 12.1 billion boe Proven reserves in 2025, SEC criteria RESERVES/PRODUCTION (R/P in years) 20 10 0 12.5 x Majors RESERVES REPLACEMENT RATIO – RRR 180 175% 200 190% 90%-10% x Majors RRR RRR Org. 49 Exploration for new discoveries to replace reserves EXPLORATION INVESTMENT US$ billion 3.3 10 3.3 3.4 50 new wells between 2027-2031 • 15 Equatorial Margin • 16 South and Southeast margins • 19 Others South and Southeast margins Equatorial Margin Others COLOMBIA AMAPÁ DEEP WATER PARÁ-MARANHÃO ONSHORE BASINS BARREIRINHAS CEARÁ CÔTE D'IVOIRE POTIGUAR CAMAMU-ALMADA BOLIVIA ESPÍRITO SANTO CAMPOS SANTOS PELOTAS ARGENTINA SÃO TOMÉ AND PRÍNCIPE NAMIBIA SOUTH AFRICA OFFSHORE BASINS ONSHORE BASINS 50 Amapá Deep Waters We will drill 15 WELLSin the Equatorial Margin BLOCK FZA-M-59 WI PB 100% BLOCK POT-M-762 WI PB 100% Potiguar MORPHO We expanded knowledge of the area's exploratory potential with the discovery of 3 hydrocarbon bearing intervals. This well is the first of a commitment to drill 8 wells in Amapá Deep Water MÃE DE OURO: DRILLING OF THE EXPLORATORY PROSPECT IN THE POTIGUAR BASIN Drilling, scheduled to start immediately after Morpho, results from the success of the exploratory campaign started in 2023 and 2024 PAMA BARREIRINHAS CEARÁ AP PA MA PI CE RN 51 Discoveries at Morpho open a new exploratory frontier in the Equatorial Margin We will drill 13 exploratory wells in the Southeast 6 in Santos Basin, 6 in Campos Basin and 1 in ES Basin PAD Sagitário Uirapuru Sudoeste de Sagitário Aram RJ PAD Libra Central Júpiter Santos Basin Cruzeiro do Sul PAD Monai Norte de Brava Água Marinha Sudoeste de Tartaruga Verde Itaimbezinho Azurita Citrino C-M-477 Jaspe Espírito Santo Basin Campos Basin Alto de Cabo Frio Central Blocks from OPC6 • We will evaluate the exploratory potential of Citrino, Jaspe and Sudoeste de Sagitário blocks, the 12 new 6th OPC* blocks, Azurita and Itaimbezinha. • We will evaluate the commerciality of the discoveries in Norte de Brava, Sudoeste de Tartaruga Verde, Água Marinha, Alto de Cabo Frio Central, Ruba (C-M-477), C-M-789, PAD Monai, Aram, Jupiter/Cruzeiro do Sul, PAD Libra Central, Uirapuru and PAD Sagitário 52 * Permanent Concession Offer. 0 25 12.5 km Rio Grande do Sul 1674 1676 1678 1670 1672 1743 1739 1741 1737 1797 1799 1793 1795 1838 1840 South Area 1277 1279 1281 1357 1359 1361 1363 1439 1441 1443 1516 1518 1520 1522 1595 1597 1599 North Area • The Minimum Exploratory Program (PEM) for the blocks acquired in the 4th and 5th OPC will be fully met through the acquisition of new 3D seismic data (completed in the southern area and ongoing in the northern area) • In Jun/25, we started the regional Environmental Licensing process for well drilling covering theentire area of the 32 blocks In Pelotas Basin, we continue an offshore 3D seismic data acquisition campaign 53 Strategic approach for the sustainability of production assets in mature basins, through evaluation of the remaining exploratory potential We will evaluate exploratory opportunities in San Telmo North Block, Bolivian Sub-Andean, and in Rio Neuquén Block, Neuquén Basin, Argentina We will evaluate exploratory upsides in production assets and exploratory blocks adjacent to installed production infrastructure 54 Expanding exploratory activities on the West African conjugate margin Strengthening our position in areas of high geological potential, applying technical and operational expertise in deep and ultra-deep waters 55 Equatorial Margin Strategic approach to replenish the exploratory portfolio Exploratory area + 292% From 2023 to 2026 Total exploratory blocks We acquired interests in 10 blocks in FOZ and in 7 blocks in CE Côte d'Ivoire We acquired interests in 8 blocks São Tomé and Príncipe We acquired interests in 4 blocks Campos We acquired interests in 16 blocks Namibia + 159% From 2023 to 2026 Pelotas We acquired interests in 32 blocks We acquired interest in block 2613 Santos We acquired interest in the Cruzeiro do Sul block South Africa We acquired interest in the DWOB block BR blocks acquired in 2026 BR blocks acquired in 2025 BR blocks acquired in 2024 BR blocks acquired through 2023 56 Asset management drives the sustainable increase in our portfolio's longevity We work to maximize the value of our assets by extending their productive life cycle, combined with strategies for the reuse and sustainable disposition of production units Extending the productive life of facilities and the systems destination strategy optimize capital allocation PRODUCTION ....... Plateau MATURE ASSETS INCREASED LONGEVITY LIFE CYCLE DESTINATION EXTENSION ORIGINAL PRODUCTION SHUTDOWN PRODUCTION SHUTDOWN WITH EXTENSION AND NEW PROJECTS • Project simplification VALUE GENERATION LEVERS • Revitalization and complementary projects • Exploratory upsides • Integrity and efficiency control • Extension of productive life • Initiatives to increase the recovery factor STRATEGY DEFINITION Reuse Decommission • Post-shutdown safety • Shorter time to remove production units • Technological and business innovations 57 Systems Reuse and Productive Life Extension: strategies that turn assets into new opportunities, reducing expenditures P-31 PRODUCTIVE LIFE EXTENSION REUSE OF PLATFORMS P-31 Revitalization and integrity actions extended P-31's operating life to 2030, contributing to value generation in the mature Albacora field P-35 After completing its activities in the Marlim field, P-35 is in Rio de Janeiro, berthed in Guanabara Bay. Petrobras is evaluating alternatives for the asset's future, including its reuse in new opportunities REUSE OF EQUIPMENT LM2500+ turbine under preservation at Petrobras' turbine workshop Reusing equipment from units being decommissioned extends asset value and can provide significant cost and schedule reductions compared to purchasing new equipment 58 MAIN EXPLORATION & PRODUCTION ASSETS 59 RJ 4.46 MMboed Total Operated Production 3Q26 2.96 MMboed Total Own Production 3Q26 ≅ 10 kgCO2e/boe GHG Index Santos Basin Pre-salt 2026 US$ 4.48 Lifting Cost 3Q26 35 Platforms 30 of which fully dedicated to pre-salt + 200 Wells through 2031 US$ 51.5 billion Investments 2027-2031 60 In 20 years, the Pre-salt has become the world's most important deepwater production hub Santos Basin Campos Basin Búzios The world's largest deepwater asset keeps delivering significant results and is prepared to overcome medium and long term challenges ¹ Excludes unit under commissioning. An asset that has proven to be extraordinary 2026 1,291 kbpd Oil production record: 11/05/2026 14.1 MMm³/d Gas export record: 08/15/2026 984 kbpd Water injection record: 10/22/2026 9.7 kgCO2e/boe¹ GHG Index: Jan-Sep/2026 75 Wells in Operation A year of records in production, gas exports and water injection • 36 Producers • 39 Injectors 61 Búzios: technical capability that turns potential into results CAPACITY INCREASE 5 FPSOs operating up to 141 kbpd above nameplate capacity PROGRESS of 1 MILLION barrels of water injected per day EFFICIENCY INCREASE +5.2 p.p. 9M2026 vs 2024 Identifying and capturing opportunities Active reservoir management and complementary projects enable a return to maximum production capacity P-75 169 kbpd Feb/23 an example of the ongoing strategy REPLACEMENT OF GAS TREATMENT MEMBRANES1 4.3 MILLION m³/d combined gains in natural gas made available to the market 169 kbpd Sep/26 FPSO back to operating above its capacity 3 years after its peak 1Combined removal of CO₂ and H₂S on units P-74, P-75, P-76 and P-77. 120 kbpd P-75 oil production curve from 2023 to 2026 62 Búzios: three major projects in 2027 and one more planned for 2032+ In parallel, we are executing complementary projects on units already installed to anticipate opportunities FPSOs in operation 2018-19 P-74 Búzios 1 apr/18 P-75 Búzios 2 nov/18 P-76 Búzios 3 feb/19 P-77 Búzios 4 2023 FPBAR Búzios 5 may/23 2025 FPTAM Búzios 7 feb/25 P-78 Búzios 6 dec/25 2026 P-79 Búzios 8 may/26 2027-31 P-80 Búzios 9 2027 P-82 Búzios 10 2027 P-83 Búzios 11 2027 2032+ Búzios 12 mar/19 Implementation Under study ¹ Raw Water Injection: injection directly into the well, bypassing the topside. 83 wells in 2027-31: 43 producers and 40 injectors 18 of which are complementary wells, including 4 RWI1wells 63 Mero Capacity increase of the 4 definitive FPSOs, above original design capacity, raises asset production and profitability 2026 operational records ~ 770 kbpd in Sep/26 Brazil's 3rd largest production, with FPSO Pioneirode Libra in Scheduled Stoppage FPSOs with the highest Production Efficiency in the Company ~ 8.0 kg CO2e/boe in Sep/26 Greenhouse Gas Index With Associated Gas Utilization Index at 99.8% Daily Production Record: 799 kbpd, in 08/11/2026 47 Wells in Operation • 23 Producers 64 • 24 Injectors Mero The short and medium-term outlook: increase in free cash flow and implementation of technologies that will ensure the asset's longevity 2027-31 Highlights Peak Production in 2027 + 19 Wells opened through 2031 (11 Producers and 8 Injectors) Completion of the 1st wave + 2nd wave of the Mero 1, 2, 3 and 4 projects Mero Extension Project FEL 2 under approval It will support the revision of the development plan and the request to extend the Production Sharing Contract in 2027 Pioneering and technological evolution HISEP® Technology (Mero 3 area) Starting full-scale tests, with the start of CTPB operations (Itajubá - MG) PRM Seismic (Permanent Reservoir Monitoring) Reducing reservoir uncertainties and seeking new opportunities to increase RF 1st stage, covering the Mero 1 and 2 regions: 1st acquisition completed in 2026 2nd stage, covering the Mero 3 and 4 regions: Subsea infrastructure installation to be completed in 2027 65 Tupiand Iracema First ultra-deepwater giants to reach 4 billion boe in cumulative production High production, efficiency and low emissions 1,122 kboed Current operated production Production Efficiency within the Industry's 1st quartile 10.2 kgCO2e/boe GHG Index 2027-31 Highlights US$ 6.7 billion Capex 2027-31 TUPI + VALOR TUPI REVIT 1 RETURN TO THE 1 MILLION BPD OPERATED LEVEL in early 2026 • Annual average target of 1 MILLION COMMERCIAL BOED by 2027 • Ambition to reach a 35% RECOVERY FACTOR in Tupiand Iracema Development focused on generating value and extending the concession contract 66 Santos basin Resilient Santos Basin pre-salt assets, in the industry's first quartile for production efficiency and CO2 emissions Atapu Atapu 2 (P-84) IN 2029 reaching total installed field capacity of 375 kbpd ~159 kboed¹ Total Production 7.8 kgCO2e/boe GHG Index Sépia Sépia 2 (P-85) IN 2030 reaching total installed field capacity of 405 kbpd and SÉPIA 3(under study) ~180 kboed¹ Total Production 9.5 kgCO2e/boe GHG Index Itapu In operation since Dec/2022, with 2 COMPLEMENTARY PROJECTS in the five year horizon ~165 kboed¹ Total Production 6.1 kgCO2e/boe GHG Index Record 2 MILLION barrels of water injectedper day in Santos Basin in Oct/2026 67 ¹ 2026 Average Production Outlook as of Oct/26. A new project concept capable of meeting around half of Colombia's natural gas demand Portfolio diversification and strengthening of Petrobras' international presence Ballena Onshore Plant Continenta l slope 4 producer wells in the 1st phase SIRIUS • 4 gas discoveries announced: Sirius-1, Sirius-2, Copuazu-1 and Sandia-1 • Subsea-to-shoreconcept: gas ~900m depth 117 km pipeline to shore ~5.8Tcf of gas in place from the wells flows through the manifold and pipeline to the onshore plant • No offshore processing platform required, with reduced Capex, Opex and emissions 68 After 5 decades of production, ES RJ Campos Basin Jubarte Voador Marlim Roncador Marlim Leste Barracuda Caratinga Espadarte Tartaruga Verde In production Marlim Sul Campos Basin continues to add value to our future results Resumption of production growth through improved asset integrity and efficiency 19 Units in operation Reversal of the production curve trend 34% higher than 2024 | 10% higher than 2025 11% Reduction in Lifting Cost 2Q26 vs 2025 19% of Brazil's Oil Production in 1H26 10 p.p. increase in operational efficiency 2026 vs 2024 22 exploratory blocks 69 13 of which acquired in 2026 After 5 decades of production, ES RJ Campos Basin Jubarte Voador Marlim Roncador Albacora Barracuda Caratinga Espadarte Tartaruga Verde Marlim Leste Marlim Sul Raia In production New production unit Campos Basin continues to add value to our future results New units and complementary projects strengthen our presence in mature fields 2 New Units in the five-year period 2027-31, with > 10% production growth by the end of the period 4 New Units under study Revit. BRC-CRT, Revit. MLS-MLL, ICSPB and Entornode Forno US$ 16 billion Capex 2027-31 7 Units with Capex for productive life extension + 120 new wells 14% Reduction in Lifting Cost 70 2031 vs 2Q26 Revitalization Projects are key to sustaining production curve growth and cost efficiency in Campos Basin Marlim and Voador Before After Albacora Before 2 Units in ramp-up > 70 new and relocated wells After OTC AWARD > 20% Lifting Cost reduction since start-up Decommissioned platforms We reversed the historical decline of the production curve and project growth based on Revitalization projects, complementary projects and efficiency improvements New platforms REVIT Marlim REVIT Albacora Production start-up in 2031 > 20 new and relocated wells > 75% of production from pre-salt > 70% Lifting Cost reduction vs 2023 2026 2031 71 2023 Resumption of onshore exploration and production development campaign, with reserve additions 72 Drillings performed 21 wells already drilled and in operation, with 13 more planned Production 20% increase in production compared to 2025 BP 2027-31 Drillings Drilling of around 90 new producer wells and 28 injectors over the next 5 years Production 40 years of sustainable production Drillings performed Resumption of new well drilling BP 2027-31 Drilling Drilling of 8 producer wells over the next 5 years Environment and flaring Preserved concession area 98% 2026 flaring 8.3% lower than 2025 URUCU BAHIA ELIEL Bomfim PHILIPPE Peçanha SABRINA Alves Monetizing oil reserves by optimizing our assets and securing the market for the future Our focus areas for continuity of the future vision, prioritizing and maturity of strategic projects High-Quality Products Increase in oil processing capacity and supply of Diesel S10 Pursue self-sufficiency in Diesel production capacity Resilient Refining System Increase in operational availability and energy efficiency Ambition of 1st Quartilein OA and IES indicators* (*) Solomon Benchmark: OA –Operational Availability; IES– Sustainable Energy Index Biorefining Low carbon products supply Production of SAF, SBC and HVO in line with regulatory requirements . SAF – Sustainable Aviation Fuel. SBC - Synthetic Blending Component. HVO - Hydrotreated Vegetable Oil, Competitive Logistics Expansion and maintenance of strategic markets Expand the fleet of ships and vessels, pipeline network, and storage capacity Fertilizers and Petrochemicals Portfolio diversification Integrate operations to monetize natural gas 74 High-Quality Products Our Current Refining System Our processing capacity installed of crude oil (distillation feedstock) is 1,813 kbpd São Paulo Rio de Janeiro Minas Gerais 1,813 kbpd* Pernambuco Recap Revap RPBC Replan Reduc Regap Rnest 57 kbpd 252 kbpd 170 kbpd 434 kbpd 239 kbpd 157 kbpd 88 kbpd Ceará Paraná Lubnor Repar 8 kbpd 208 kbpd Rio Grande do Sul Refap 201 kbpd (*) Reference feedstock. 75 High-Quality Products Our Refining System in 2031 Oil processing capacity (distillation feedstock) PROCESSING CAPACITY* kbpd 1.813 1,813 212 67 81 41 40 including in BP 2027–2031 2.173 2,173 2024 2025-26 2027-31 Rnest distillation revamp (2025) RPBC UV distillation revamp (2025) RevapU-210 distillation revamp (2026) (*) The values presented refer to the increase in installed capacity. The effective utilization of processing capacity will depend on market analyses and conditions. 2027-31 Under Evaluation Rnest Refinery revamps TOTAL 2025-2031 2031 +212 kbpd +148 kbpd +360 kbpd 76 High-Quality Products Advancing along the path to maximizing our refining capacity São Paulo Rio de Janeiro Minas Gerais Pernambuco Revap RPBC Replan Reduc Regap 2025/2026 +19 kbpd + 6 kbpd-- 2027-31 +25 kbpd +25 kbpd +24 kbpd +25 kbpd Rnest Paraná Repar +42 kbpd +170 kbpd +12 kbpd Rio Grande do Sul Refap +12 kbpd (*) The values presented refer to the increase in installed capacity. The effective utilization of processing capacity will depend on market analyses and conditions. 2027-31 TOTAL Processing capacity 2031 +293 kbpd 2,173 kbpd 77 High-Quality Products Addition of 293 kbpd in processing capacity over 2027–31 Distillation feedstock — project start-up schedule1 Rnest Train 1 + SNOx Revamp +42 kbpd RPBC UV Distillation Unit Revamp +6 kbpd Revap U-210 Dist. Unit Revamp +19 kbpd 2025/2026 RPBC UN Dist. Unit Revamp +8 kbpd Replan U-200A Dist. Unit Revamp +25 kbpd Rnest UDA U-12 early start-up +50 kbpd Rnest Train 2 +80 kbpd RPBC UC Dist. Unit Revamp +17 kbpd ReducU-1710 Dist. Unit Revamp +6 kbpd RegapU-101 Dest. Unit Revamp +25 kbpd RnestTrains 1 and 2 Revamp 2 +40 kbpd ReducU-1510 Dist. Unit Revamp +6 kbpd Repar U-2100 Dist. Unit Revamp Chart legend +12 kbpd Refap U-50 Dist. Unit Revamp +12 kbpd Under evaluation 1 The values presented refer to the increase in installed capacity. The effective utilization of processing capacity will depend on market analyses and conditions. 2 Included in BP 2027-31 ReducU-1210 Dest. Unit Revamp +12 kbpd 2031 78 Pursuing self-sufficiency in High-Quality Products diesel production capacity MARKET SHARE DIESEL 9M26 • % 14% 13% 6% 8% 59% Petrobras production Other players production Petrobras imports Other players imports DIESEL A – BRAZILIAN MARKET EXCLUDING OTHER PRODUCERS Capacity to meet market demand 2031 Demand Production Capacity 2027-31 2025/2026 Biodiesel +112 kbpd Additional capacity through 2031 Current +293 kbpd S10 Diesel TOTAL 2031 +405 kbpd Source: ANP and Petrobras analysis. The figures refer to installed capacity for diesel production. Actual production of this oil product will depend on market analyses and conditions. Production capacity in 2031 results from the contribution of quality improvement and additional volume. 79 Increase in S10 Diesel Production Highly profitable projects with IRRs above the average for projects in the RTM segment Quality S10 Diesel Boaventura + 76 kbpd Improvement** Additional Volume High-Quality Products Potential EBITDA*** RPBC Replan Reduc Regap Rnest Repar Refap TOTAL + + + + 7 kbpd 27 kbpd 8 kbpd 13 kbpd +108 kbpd + 23 kbpd + 31 kbpd +293 kbpd 56-- 20-- 13-- 23 27 139 kbpd 20 7 7 8 -- 108-- 4 154 kbpd We estimate additional diesel production volume will generate EBITDA of US$ 1.1 billion per year (*) Potential increases in S10 diesel refer to installed capacity increases over the 2027–2031 horizon. Actual S10 diesel production will depend on market analyses and conditions. (**) Conversion from S500 to S10. (***) To calculate the sensitivity, a diesel crack spread of US$20/bbl and the total volume added over the plan horizon were used. 80 Diesel S10: Project Start-Up Schedule Rnest Distillation Revamp +6 kbpd Replan New HDT +63 kbpd RPBC Distillation Revamp +2 kbpd Revap HDT Revamp +41 kbpd 2025/2026 Chart Legend Additional S10 diesel volume Exchange of S500 for S10 Under evaluation Note: The figures refer to increases in installed capacity. Actual S10 diesel production will depend on market analyses and conditions. Rnest Train 2 +88 kbpd RPBC Distillation Revamp +2 kbpd RegapHDT Revamp +13 kbpd Replan Distillation Revamp +3 kbpd RPBC Distillation Revamp +5 kbpd ReducDistillation Revamp +2 kbpd Boaventura HCC/HDT +56 kbpd +20 kbpd ReducDistillation Revamp +4 kbpd High-Quality Products Repar New HDT +23 kbpd RefapNew HDT +27 kbpd Replan New HDT +20 kbpd RnestRevamp, Trains 1 and 2 +20 kbpd Replan Distillation Revamp +4 kbpd ReducDistillation Revamp +2 kbpd Refap Distillation Revamp +4 kbpd 2031 81 High-Quality Products Rnestand Boaventura Maintaining Capex while delivering value through increased processing capacity and diesel production RNEST Train I + SNOx Work completed Processing capacity (distillation) ADU U-12 start-up brought forward Under construction Completion by 2027 + 42 kbpd S10 diesel + 50 kbpd + 6 kbpd Capex BP 2027-31 US$ 1.7 billion* BOAVENTURA REFINING Train II Under construction Completion by 2029 + 80 kbpd + 88 kbpd Revamp Trains I and II Under evaluation Completion by 2031 + 40 kbpd + 20 kbpd 2025 Contracts for the main units HIDW, HCC and Offsites 2026 2029 All contracts signed Start-up + 76 kbpd of S10 diesel + 20 kbpd of jet fuel + 12 kbpd of Group II lubricants Capex BP 2027-31 US$ 2.9 billion* ADU: Atmospheric Distillation Unit / HIDW: Hydroisodewaxing Unit / HCC: Catalytic Hydrocracking Unit Note: The figures refer to projected increases in installed capacity. Actual utilization of processing and production capacity, including S10 diesel, will depend on market analyses and conditions. * Capex under implementation. 82 Cumulative gains RefTOP: focus on energy efficiency and carbon reduction 83 2030 Ambition VALUE Ability to process 100% of pre salt crude oils achieved in April 2026** RELIABILITY Initiatives will be monitored through ProCONF(Reliability Program) ENERGY PERFORMANCE Energy sustainability: IES* ≤ 86 SUSTAINABILITY Emissions intensity: IGEE ≤ 35 kgCO2eq/CWT The greenhouse gas emissions intensity ambition (IGEE) was revised to reflect the evolution of the strategic planning assumptions. (*) IES –Sustainable Energy IndexTM. (**) Excludes the lubricants plant. (1) Reductions are measured against 2020 performance. The 2026 gains reflect cumulative realization through August. (2) Based on 2025 emission levels.. Cumulative reduction in NG consumption 3,394 million m3 Avoided emissions 5,959 thousand ton CO2eq Equivalent to REPLAN’s emissions over 1 year and 6 months of operation1. New Investments US$ 1.3 billion planned over the five-year period for more than 70 projects across the Refining System Resilient and Efficient Refining Refining reliability ProCONF Refining Reliability Program Ambition 2030 - Reliability Operational availability: OA* ≥ 97% 95.9% 95,9% 96,4% 97,2% 96.4% 2023 2026 2026 utilization factor Some scheduled maintenance stoppages planned for 2026 were postponed in light of the global scenario, following technical and safety assessments, enabling a high utilization factor (FUT) during the period: Resilient and Efficient Refining Scheduled Maintenance Stoppages 97.2% Investments 2027-28 US$ 1.8 billion BP 2027-31 2031 US$ 3.5 billion 95% Scheduled shutdown costs in line with the world’s best performing refineries 101% 1Q26 2Q26 99% 3Q26 Each 1% increase in FUT in 2026 adds** : (*) Solomon benchmark: OA– Operational Availability. (**)Assumes the same proportions of refined product output and feedstock consumption as in 2026, with imports replaced by domestic production, surplus output exported (fuel oil, gasoline and coke), and increased deliveries to the domestic market, reducing crude oil exports. OA: Refinery operational availability relative to its reference feedstock, including the impact of scheduled shutdowns(annualized losses) at process units. FUT: Measure of distillation unit utilizationrelative to reference feedstock. • 19 kbpd in refined product output • US$ 100 million in revenue 84 Resilient and Efficient Refining Scheduled maintenance stoppages sustain reliability, enabling a high FUT to be maintained Main drivers of higher scheduled stoppage Capex in the refining system 1 Postponementof stoppagesfrom 2026 to 2027 Need to postpone scheduled stoppages from 2026 to 2027 due to the global geopolitical scenario and its impacts on the international oil and oil products market 2 3 4 Higher Utilization Factor (FUT) Higher refinery FUT, requiring larger equipment maintenance scopes to be planned for upcoming unit stoppages More complex stoppages Higher complexity of scheduled stoppages in the period, aiming to extend future unit run lengths with sustainable reliability New equipment in the multi-year plan Inclusion of utility equipment/systems, such as turbogenerators, Water Treatment Plants and Industrial Wastewater Treatment Plants, to increase refinery reliability Schedule maintenance stoppages in 2027 REPLAN CRUDE, HDT 4,500 workers REGAP FCC, HDS 3,100 workers REDUC COKE, HDT-NK 3,200 workers RPBC FCC, HDT 3,150 workers RECAP CRUDE, FCC, HDT 4,550 workers REVAP PROP, HDS 300 workers CRUDE: Crude Distillation | FCC: Fluid Catalytic Cracking | HDT: Hydrotreating | HDS: Hydrodesulfurization | NK: Coker naphtha | PROP: Propylene 85 Refining is the most profitable option for Petrobras oil Project start-ups and higher processed feedstock position RTM to capture more value EBITDA PER BARREL OF OIL US$/bbl 18 16 14 12 10 0 2 4 6 8 +20% 6x 12x 2027 Refining 2031 Sales DESTINATION OF PETROBRAS’ CRUDE OIL % of total 55% 45% 58% 42% 2027 2031 Resilient and Efficient Refining Rnest 86 Refining Innovations Resilient and Efficient Refining GIRO Digitalization of operational routines Operational excellence in routine compliance, recognized by the Gartner Eye on Innovation Awards in the Americas category OTS Operational training simulator Operator training using simulators to improve reliability, efficiency and safety TRACKPLAN Digital planning for Refining + Logistics Designing a more efficient production plan for the refining system, with improved asset utilization and margin capture BLENDING ONLINE Reducing giveaway through value capture Real-time optimization of intermediate stream blending, maximizing economic returns and increasing diesel production 87 Giveaway- product quality above the required specification Biorefining Biorefining: integrating the industrial complex with demand for renewables Refinery upgrades and new units capable of converting biomass into high value-added products DIESEL R1 COPROCESSING Production and marketing of diesel with renewable content are already available. MARKETING Diesel R5 Units operating with the product since September 2023, in line with market demand. (1) Diesel with renewable content. (2) SBC -Synthetic Blending Component (SAF production component). (3) HVO -Hydrotreated Vegetable Oil, also known as Diesel Verde (Green Diesel). (4) HEFA –HydroprocessedEsters and Fatty Acids. (5) ATJ -Alcohol-to-Jet. SUSTAINABLE AVIATION FUEL COPROCESSING (SAF) REDUC • SAF production and marketing with International CORSIA Certification REVAP • Implementedand undergoing certification REGAP • Implemented and undergoing certification REPLAN • Implemented and undergoing certification DEDICATED PLANTS (SBC2and HVO3 ) RPBC HEFA4 •15 kbpd(2030) •Construction started BOAVENTURA HEFA4 •19 kbpd(2032+) •Under evaluation REPLAN ATJ5 •10 kbpd(2032+) • Under evaluation Partnership Projects: Riograndense (15 kbpd) SAF with International CORSIA Certification, produced and marketed at REDUC since 2025 Latin America’s 1st SAF produced with CORSIA Certification 88 Expansion of logistics infrastructure Competitive Logistics and Petrobras presence in markets Fleet expansion: ships and vessels Renewal and expansion of the cabotage ship fleet for low liquidity classes in addition to the chartering of new offshore support vessels, ensuring operational availability INVESTMENT US$ 2.1 billion1 Expanding our presence at Brazil’s growth frontiers A new investment cycle in multimodal logistics expansion to increase market reach in the Midwest, Northern Arc2 and MATOPIBA3, reduce logistics costs and our carbon footprint, and capture a larger market share for Petrobras INVESTMENT US$ 1.4 billion Expanding and maintaining logistics infrastructure Optimization of logistics assets to maximize operational efficiency, ensuring higher availability and cost reduction and enabling monetization oil reserves and RTM assets INVESTMENT US$ 3.5 billion (1) Considering US$ 0.6 billion in target investment for the acquisition of MR2 and Handy-1 vessels. / (2) Logistics corridor connecting ports and transport routes in the North and Northeast regions of Brazil. / (3) Agricultural frontier encompassing parts of Maranhão, Tocantins, Piauí and Bahia. 89 Competitive Logistics Mar Aberto: investments to ensure logistics for our operations and foster the Brazilian shipbuilding industry Fleet renewal and expansion projects for the Petrobras System, an important driver of a Just Energy Transition Keel-laying ceremony marking the official start of construction of the first Handy 2 vessel, Ecovix– Rio Grande/RS Construction of 21 cabotage vessels and 18 barges 8 Gas Carriers (5 contracted in Brazil) Contracts signed 4Handy 2 Under construction, deliveries starting May 2028 4 Medium Range 1 – MR1 Contracts signed 4Medium Range 2 –MR2 In the planning stage 1 Handy 1 In the planning stage 18 Barges and Push Boats for bunkering services Under construction, deliveries starting November 2026 US$ 2.1 billion in investment Chartering of 30 new support vessels to renew the fleet supporting E&P activities • 12Platform Supply Vessel (PSVs) Under construction, first delivery for September 2026 • 10Oil Spill Response Vessel (OSRV) Under construction, deliveries starting May 2027 • 8 Remote Support Vessel (RSV) Contracts signed, in Brazil Estimated third-party construction cost of ~US$ 2.7 billion 90 Competitive Logistics Investing in a Multimodal Logistics Network to Expand Our Presence at Brazil’s Growth Frontiers NORTHERN ARC1 MIDWEST 1 4 MATOPIBA2 RNEST 3 2 REPLAN 1Logistics corridor linking ports and transport routes in the North and Northeast of the country. 2Agricultural frontier encompassing areas of Maranhão, Tocantins, Piauí and Bahia. › Expanded presence in Brazil’s Midwest region and MATOPIBA through commercial initiatives and more efficient logistics projects › Pursuit of logistics synergies and a stronger presence in the Northern Arc › Lower logistics costs and a smaller carbon footprint New REPLAN Midwest pipeline OSBRA Rail connection ITAQUI • New pipeline connecting REPLAN to the Midwest • New inland distribution terminals • Expansion of the OSBRA pipeline’s capacity • Higher rail volumes via REPLAN • New multimodal terminal in Itaqui, Maranhão 91 Competitive Logistics Expansion and maintenance of logistics infrastructure Major projects Investments in the Santos Waterway Terminal Santos Terminal Auction and Expansion Commitments: • New pier with 3 berths • 10 new tanks (total of 150 thousand m³) for oil products and biofuels • New truck loading stations Relevance Investments in the New OBAPI Pipeline • 130 km pipeline for heavy distillates, connecting the Barueri and Cubatão Terminals, in SP • New tanks at the Cubatão Terminal Relevance • Continued outflow of fuel oil and bunker from REPLAN to the Port of Santos, via a new route that avoids densely populated areas • Investments in the largest port in Latin America • Main outlet for heavy distillates from SP refineries • LPG supply to the regional market • Balancing hub for the light products network, with inflow and outflow flexibility • Main bunker supply point in Brazil • Crude oil supply in contingencies • Increased system reliability 92 Competitive Logistics Logum: higher presence in the ethanol market with integrated logistics Signing for the acquisition of the remaining equity interest in Logum (70%) on 11/11/2026* • Logumis located on Brazil's main ethanol logistics corridor, connecting major production hubs to the São Paulo/SP metropolitan area and to the Ilha D'Água port terminal. • Operational synergies: benefits of logistics integration with the Petrobras System, with potential efficiency gains from combining logistics for low carbon products, infrastructure, operational reach and technical expertise. SP LOGUM PETROBRAS SUBCONTRACTED PIPELINES UBERABA RIBEIRÃO PRETO PAULÍNIA MG SÃO JOSÉ DOS CAMPOS GRU DUQUE DE CAXIAS BARUERI GUARAREMA SÃO CAETANO DO SUL ETHANOL FLOW * Completion of the transaction is subject to the fulfillment of conditions precedent set forth in the purchase and sale agreement, including approval by the Administrative Council for Economic Defense (CADE). RJ ILHA D’ÁGUA CABOTAGE AND EXPORTS 93 Fertilizers: generating profitability through integration with the oil and gas chain 94 Context Imports 100% of the urea used in Brazil in 2025 was imported(NPK fertilizers: 92%) Geopolitics ~1/3 of the urea traded worldwide passes through the Strait of Hormuz Volatility +35% rise in international urea prices in two weeks (Mar/2026) > Petrobras Opportunities •Monetization of natural gas with firm demand and integration with refining assets • Increased urea production with improved asset reliability • Increased production close to Brazil's largest consumer market with UFN III • Studies of new projects to increase production > Coverage of domestic urea demand 20% 35% 2027 2029 FAFEN-BA, FAFEN-SE and ANSA with UFN-III Total Capex BP 2027-31 US$ 1.5 billion > Capex under implementation focused on reliability and increasing the useful life of assets as a value lever US$ 0.5 billion* Scheduled maintenance stoppages Industrial revitalization Modernization and automation Safety and environment ANSA-PR Urea: 1,970 t/d Urea: 1,800 t/d Urea: 1,300 t/d FAFEN-BA FAFEN-SE ~5% of domesticdemand ~8% of domesticdemand Resumption of existing units Meeting a significant share of domestic urea demand 95 SALES LEVELS FAFEN-BA and FAFEN-SE since January 2026 Urea 500 thousand t of urea sold Ammonia 135 thousand t of ammonia sold, domestic market and exports 12% average share of the domestic urea market Fertilizers ~7% of domestic demand The use of ARLA 32 produced at ANSA and FAFEN Bahia reduces NOx emissions from the Diesel S10 fleet > SUSTAINABILITY Development of new low carbon products and enhanced-efficiency urea *Considers UFN-III Capex after start-up. UFN-III: start-up in 2029 Fertilizers Schedule and budget unchanged since project approval NOV/2025 BP 2026-30 foresees completion in 2029 JUN/2026 Contracts signed with the winning companies JUL/2026 Mobilization and physical resumption of construction CONSTRUCTION IN NUMBERS 2029 Start of commercial operation CAPEX ~US$ 1 billion to completion CAPACITY 3,600 t/d of urea + 2,200t/d of ammonia IMPACT ~8 thousand jobs during construction (177 t/d available for sale) In Três Lagoas -MS, UFN-III increases domestic urea demand coverage by ~15% and creates industrial capacity in the Midwest 96 Petrochemicals: operations integrated with our industrial facilities An alternative to keep capturing value across Petrobras' business chain amid declining fuel demand Business Drivers • Capture value and implement synergies • Diversify the portfolio with higher value added products • Resilience against declining demand for fossil fuels • Lower carbon emissions RLH -Refinery Light Hydrocarbon. LPG - Liquefied Petroleum Gas. Integration opportunities Boaventura • Directing ethane and propane streams to petrochemicals, the feedstocks with the highest competitive advantage • US$ 0.1 billion logistics integration project with existing petrochemical assets Refining • Higher supply of propylene and other feedstocks (LPG and HLR) • Use of streams, logistics optimization and increased industrial competitiveness between refineries and petrochemical hubs 97 Reliability Quality Processing capacity Production of high value-added products With investments under the BP 2027–31 and diesel crack spread* of around US$20/bbl, we expect average potential EBITDA for the RTM segment of: ~US$ 9 billion per year 98 *International crack spread on the U.S. Gulf Coast. Investments in a competitive, efficient and integrated refining and logistics complex BP 2027-31 • Total portfolio of RTM 1.5 0.1 7.0 1.0 23.6 US$ billion 22.6 Note: Projections subject to +/ 5% variation. Evaluation Implementation Refining Fertilizers 15.0 Marketing and Logistics Petrochemicals 99 RTM Capex Under Implementation BP 2026-30 vs BP 2027-31 US$ billion 15.8 15,8 1,0 . 4,1 . 10,8 . 1.0 1,0 0.5 0,5 16,6 16.6-0.7-0,7 2.3 2,3 • Scheduled shutdowns • Projects to increase efficiency • Bio refining and high-quality products 22,6 22.6 1.1 1,1 1.4 1,4 • MR2 vessels • Infra. maintenance 0.6 0,6 • Improvements and shutdowns • Ethane pipeline 0.6 0,6 22 0,1 . . 1,5 6,8 . 14,1 . BP 2026-30 Inflation FX Period adjustment BP 2026-30 Normalized Refining C&L Resilient refining portfolio Capital project reviews Fertilizers Competitive logistics Petrochemicals Fertilizers and Petrochemicals Improved project execution BP 2027-31 100 Note: Projections are subject to a ±5% variation. LetíciaTitoneli GiuliaTrazzi PatríciaCunha Value proposition Gas & Power Act in a competitive and integrated way in the operation and commercialization of gas and energy, optimizing the portfolio and promoting the inclusion of renewable sources 102 Robust portfolio of certified, contracted thermal power plants integrated into Brazil’s National Interconnected System Thermal plants Natural gas processing units Regasification terminals Gas network 1 9M25 vs. 9M26. 2 ISO 55001. Natural Gas +19% domestic gas (own production)1 + 100 MMm³/day: Processing Capacity • 40 MM m³/day in two Regasification Terminals • Import via pipeline • 99.99% Supply Reliability • Over 30 years of experience Energy • 6th largest power generation player in the country, with 13 thermal power plants connected to the integrated transmission grid and 4.6 GW of capacity • The successful outcome of the 2026 LRCAP (Capacity Reserve Auction) ensured the recontracting of nine of our previously uncontracted assets. • The first and only Certified Thermal Power System in asset management2in the country, with reliable and competitive units • Projects: New Thermal Power Plants in the Boaventura Energy Complex (800MW) 103 Success in the 2026 LRCAP1 Thermal power portfolio recontractedfor up to 10 years, securing R$ 4.3 billion in annual revenue Key Figures BEFORE: 2.0 GW • Contracted capacity › NOW: 4.6 GW • Contracted capacity › ~R$ 65 billion • Total fixed revenue from the Thermal Power Portfolio LRCAP Contract Period: 2026–20412• 10 years for gas-fired plants and 3 years for diesel-fired plants Strategic Implications › Cash flow predictability Contracted fixed revenue for a decade, with no exposure to electricity volumes or prices. › Energy security Firm capacity for Brazil's National Interconnected System (SIN) during a period of heightened supply reliability risks identified by the National System Operator (ONS), amid the rapid expansion of intermittent renewable energy sources. Três Lagoas Termoceará Vale do Açu Termobahia › Flexible gas demand Juiz de Fora Termomacaé Seropédica When dispatched, thermal power plants can consume up to ~16.6 MM m³/day of natural gas, with fuel costs remunerated separately through the Variable Unit Cost (CVU). 12026 Capacity Reserve Auction (LRCAP) / 2The Electricity Sector Monitoring Committee (CMSE) approved bringing forward the start of supply from August 2027 to September 2026 for the Termomacaé, TermocearáDiesel and TrêsLagoas thermal power plants. Nova Piratininga Canoas 104 Dynamic performance in synergy with clients We want to be the #1 choice in the market Structural Actions › Increase in the supply of domestic gas from our own production › New competitive commercial products › Mapping of the customer base to identify new opportunities in the short, medium and long term › New Customer Channel: Focus on relationship-building * 9M26 vs. 9M25. Results › We supply all distributors in the integrated network › Free-market sales growth of around 70% * › We doubled our customer base, serving the free market in segments such as steel, metallurgy, pulp and paper, ceramics, glass, petrochemicals and specialty gases 105 G&P portfolio remains resilient BP 2027-31 • Total portfolio of G&P 0.5 0.6 1.9 3.0 1.1 US$ billion 0.2 Evaluation Implementation 1.8 Current Investments New Thermal Adjustments of Natural Gas Processing Units Power Plants Others 106 Note: Projections subject to +/- 5% variation. G&P Capex under implementation BP 2026-30 vsBP 2027-31 US$ billion 2.2 0.1 2.2 0.1 0.2 0.6 0.6 1.0-0.2-0.4 • New thermo power plant 1.9 0.7 0.7 0.6 BP 2026-30 Inflation FX Period Adjustment Normalized BP 2026-30 Current Investments New TPP Return to the Portfolio Under Evaluation BP 2027-31 107 Note: Projections subject to +/- 5% variation. Value proposition Low Carbon Operate in low-carbon businesses, diversifying the portfolio in a profitable way and promoting the longevity of Petrobras 108 The energy transition will materialize through the entry of new sources Renewable molecules are a strategic hedge to preserve the competitiveness and value of existing businesses, and renewable generation will be the basis for the growth of the electricity mix Exajoules LIGHT Gasoline 2.3 2025 2.5 2040 Electricity Natural Gas Biofuels Oil Products AVIATION Jet fuel 0.4 0.3 2025 HEAVY Diesel 1.7 2.3 2040 Biofuels Oil Products 2025 2040 Electricity Natural Gas Biodiesel + HVO Oil Products MARITIME Bunker 0.1 2025 0.2 GW avg ELECTRICITY MIX 136.2 81.9 2040 Biofuels Oil Products 2025 2040 Wind and Solar Nuclear and other Hydroelectric Biomass Thermal power plant ETHANOL: Currently at 32% and could reach 35% SAF: Compliance with global regulations (CORSIA) from 2027 onwards Source: National Energy Balance and Petrobras. 1 IMO: International Maritime Organization. BIODIESEL: New mandate, potentially reaching 20% by 2030 Marine fuel with renewable content: aligned with the IMO’s1 decarbonization strategy SIN generation National Interconnected System 109 Our journey towards a more sustainable future Entry into these segments is in line with regulatory and market progress DECARBONIZATION BIODIESEL BIOREFINING & GREEN CHEMICALS SOLAR AND ONSHORE WIND ENERGY STORAGE ETHANOL BIOMETHANE CARBON CAPTURE (PILOT & HUBS)* LOW CARBON HYDROGEN & DERIVATIVES CRITICAL MINERALS OFFSHORE WIND *CCUS-EOR operating since 2008. The graph represents the time frame of entry into each business, and does not indicate the intensity of the investment. 2025 2026 2027 2028 2029 2030 2031 2032+ 110 Bioproducts are a strategic hedge for the longevity of existing infrastructure The integration of renewable molecules enhances resilience and preserves the relevance of our assets BIOFUEL CHAINS ETHANOL BIODIESEL INTEGRATED INDUSTRIAL PLATFORM Integration logic: diversify feedstocks and products, leverage existing assets and expand access to end markets BIOREFINING Co-processing & Dedicated plants REFINING SYSTEM AS A HUB Integrates renewable streams into existing infrastructure MARKETS & CONSUMERS MULTIPLE PRODUCTS & ROUTES Light mobility Road transport ethanol and biomethane biodiesel, HVO and biomethane Strategic hedge: more alternatives to preserve the BIOMETHANE competitiveness and value of existing businesses Aviation and maritime SAF and advanced biofuels Industry and cities heat, gas and renewable products 111 REGULATORY ADVANCES Increase in the mandate for blending anhydrous ethanol with gasoline, currently at 32% (E32) and potentially reaching 35% by 2030, supporting ethanol demand MARKET • Expansion of the market for hybrid flex-fuel cars • Evolution of sustainable aviation routes • Ethanol companies advancing in the marine fuel supply market ›REFINING FEEDSTOCK Ethanol and its co-products are feedstock for the production of biodiesel, SAF and Diesel R ›BACKHAUL FREIGHT Ethanol and oil products, in road and rail transport modes ›DIRECT SALES Prospecting large agribusiness clients ›CCS & BECCS High-quality carbon credits using technologies mastered by Petrobras ›E-FUEL High-purity biogenic CO2as a critical input for the next generation of e-methanol, e-SAF 112 MODEL Entry into the segment through minority stakes in leading companies: faster entry, with lower initial investment and reduced risk, positioning Petrobras to capture demand growth SYNERGIES Ethanol Central role in the future of light transportation, with strong potential in the aviation and maritime segments SAF: Sustainable AviationFuel / BECCS: Bioenergy with Carbon Capture and Storage / CCS: Carbon Capture and Storage. Corn ethanol Partnership between Petrobras and Cerradinho in Neomillewill enable the companies to strengthen their commercial relationship across several business segments 42% Petrobras 58% Cerradinho › Group founded more than 50 years ago, one of the benchmarks in the sector › Low leverage and robust cash generation › Logistics advantages from integration TCO: Technical Corn Oil. STRATEGIC COOPERATION WITH RIGHTS OF FIRST REFUSAL (20 YEARS) › ACQUISITION: Ethanol:42% of volume (Neomille + Cerradinho) TCO*: 90% of volume (Neomille) › SUPPLY: Diesel:50% of demand (Neomille + Cerradinho) › Urea and Sulfur: Volume to be defined › CHAPADÃO DO CÉU (GO) Milling: 1.1 MM ton/year Ethanol: 0.5 bn l/year › MARACAJU (MS) Milling: 0.6 MM ton/year Ethanol: 0.3 bn l/year 113 REGULATORY ADVANCES Biomethane mandate approved, with entry into force pending the issuance of the first CGOBs¹ MARKET • Growth of the domestic market • Growing demand from industry and road transport • Opportunity to scale up the domestic market ›HEDGE FOR MANDATE OBLIGATION Petrobras as the main off-taker, guaranteeing stable demand for producers ›DIVERSIFICATION OF SOURCES Possibility of reducing LNG imports ›DECARBONIZATION OF OPERATIONS Replacement of fossil fuels ›LOW CARBON EMISSION HYDROGEN Biomethane as an input for production ›NEW ENERGY SOLUTIONS Leveraging infrastructure and offering products with electricity, gas and biomethane ›BIOPRODUCTS Integration with ethanol projects ›BECCS High-quality carbon credits using technologies mastered by Petrobras 114 MODEL Entry into the segment through a minority stake with a relevant player, with a robust project pipeline across different technological routes and feedstock sources Biomethane Regulatory advances foster a large potential market ¹CGOB -Certificate of Guarantee of Origin for Biomethane. SYNERGIES CALL FOR PROPOSALS Petrobras will hold calls to receive proposals and negotiate Biomethane and CGOB contracts with terms of up to ten years, starting in 2027 REGULATORY ADVANCES • Increase in the mandate: currently at 15%, potentially reaching 20% by 2030 • CNPE¹ may raise the annual target to up to 25%, subject to proof of technical feasibility MARKET • Consistent value generation, with resilient margins and complementary revenues. • Capital discipline, with an efficient investment structure and lower Capex intensity. ›BIOREFINING Vertical integration of the biodiesel chain with crushing of grains and/or oils and fats (raw material for SAF via the HEFA route) ›MARINE FUEL Decarbonization through bunker fuel for industrial and maritime clients (B24 and B100 markets) ›DIRECT SALES Prospecting for large agribusiness clients 115 MODEL Expanding operations in the segment through partnerships with relevant players, addressing access to raw materials, increasing margins and capturing projected demand growth. Biodiesel A solution for decarbonizing heavy road transport and an outlook for maritime transport SYNERGIES ¹CNPE – Brazil's National Energy Policy Council. Biorefining Integrating the industrial facilities with the demand for renewables DIESEL R¹ COPROCESSING › Production and marketing of oil products with renewable content already available MARKETING › Units operating with the product being marketed since September 2023, in line with market demand SAF COPROCESSING › REDUC:Production and marketing of SAF with CORSIA International Certification since 2025 › REVAP, REGAP & REPLAN: Implemented and undergoing certification DEDICATED PLANTS (SBC² and HVO³ - 100% renewable): › RPBC HEFA: 15 Kbpd (2030) › BOAVENTURA HEFA: 19 Kbpd (2032+) › REPLAN ATJ: 10 Kbpd (2032+) RAW MATERIALS › RPBC (SP): Final investment decision approved for the dedicated SBC and HVO production plant ETHANOL and its co products are raw materials for SAF production (ATJ technology –Alcohol-to-Jet) › Vertical integration of the BIODIESELchain expands access to oils and fats (raw material for HEFA) ¹ Diesel with renewable content. ² Synthetic Blending Component for SAF Production (Sustainable Aviation Fuel). ³ Hydrotreated Vegetable Oil, also known as green diesel. 116 Renewable generation integrated with the storage chain is an essential asset to meet future demand The generation and storage chain opens the way for entry into the critical minerals segment RENEWABLE GENERATION ONSHORE WIND SOLAR PHOTOVOLTAIC INTEGRATED STORAGE PLATFORM BESS (Battery Energy Storage System) Flexibility, stability and intermittency management BATTERY CELL & PACK ASSEMBLY CRITICAL MINERALS Growth in renewable generation reinforces the MARKETS & ENERGY CONSUMERS POWER SYSTEM INDUSTRY MOBILITY Grid and stability Competitiveness Electrification CITIES importance of storage systems for reliable energy supply and requires a supply of critical minerals Reliable energy 117 Electrification of traditional sectors and future demand keep renewable generation a robust and profitable diversification alternative The expansion of renewable generation, combined with the electrification of operations, creates new value levers and accelerates Petrobras' progress in the energy transition OUR CHOICES Expanding our presence in renewable generation, prioritizing existing platforms and competitive projects integrated with storage and other Petrobras businesses, focusing on long-term value FOCUS AREAS • A key lever for decarbonizing our operations • Expansion of sales to free market consumers • New demand from Data Centers, Industries, Buildings, Transportation & Electric Mobility • Support for hydrogen production projects by electrolysis RENEWABLE GENERATION Joint Venture with Lightsource BP › Milagres Solar Photovoltaic Plant (CE) with 212 MWpof installed capacity, in operation since 2023 › Pipeline of 1 to 1.5 GW at a more advanced stage of development › In energy storage, the JV registered projects with significant capacity for the Capacity Reserve Auction 118 Energy storage A strong Brazilian market, with expected demand through capacity reserve auctions SEGMENT OUTLOOK: • Growing demand tied to the evolution of Brazil's energy mix and the need to mitigate curtailmentand modulate prices • High synergy with industrial facilities, enabling greater efficiency and/or decarbonization of existing assets FOCUS AREAS • Investment in BESS* projects under competitive business models, either our own or in partnership, with emphasis on capacity reserve auctions • Assessment and development of internal energy optimization opportunities, leveraging the expertise gained in the capacity reserve market *BESS: Battery Energy Storage System. 119 Critical Minerals Strong growth in demand for batteries for electric vehicles and stationary storage, driving demand for minerals CONTEXT • Favorable regulatory environment, with the publication of Decree 13,146/2026, which defines the country's critical and strategic minerals, including those in the storage chain • Greater recognition of critical minerals as strategic assets for energy and industrial security UPSTREAM Investment Evaluation 1 MINERAL EXPLORATION 2 MINERAL EXTRACTION OUR APPROACH Assessment of business and R&D opportunities in critical minerals, prioritizing those with the greatest synergy with Petrobras' energy businesses, especially the battery value chain, such as prospecting, extraction, refining and assembly (pack) MIDSTREAM R&D 3 MINERAL REFINING 4 BATTERY CELL ASSEMBLY DOWNSTREAM Investment Evaluation 5 BATTERY PACKS 6 BATTERY ENERGY STORAGE SYSTEM 7 ELECTRIC MOBILITY (CHARGING) 8 REUSE 9 RECICLYING 120 Low Carbon Hydrogen and its derivatives A solution for hard-to-abate sectors KEY LEVERS MANDATES & REGULATIONS • Incentives aimed at decarbonizing operations and products • Rules being defined in Brazil and worldwide • Mandates in force in the European Union across different segments • Technologies available on a commercial scale for product applications AUCTIONS Gradual market development with the implementation of international auctions MODEL Operating through our own projects and strategic partnerships, leveraging the Company's synergies and expertise Pilot plant SMALLER-SCALE PROJECTS AND COMMERCIAL INITIATIVES SMALLER-SCALE PROJECTS • PILOT PLANT (RN) -AÇU VALLEY 2 MW of electrolysis (2027) • PILOT PLANT (SP) – REPLAN 20 MW of electrolysis (2030) OWN AND PARTNERSHIP PROJECTS Commercial low carbon hydrogen, ammonia and e-methanol projects under development: • LOW CARBON AMMONIA (BA) 130 kta (2030+) • E-METHANOL (SP) 100 kta (2030+) Thermal power plant of Açu Valley, RN 121 121 Expanding our technological leadership in CCUS Developing capture and storage hub infrastructure for our own needs and to provide services to third parties CCUS-EOR* PROJECT (PRE-SALT) ~87.5 MtCO2 Accumulated since 2015 *CCUS: Carbon Capture, Utilization and Storage. EOR Enhanced Oil Recovery. SÃO TOMÉ PILOT RIO DE JANEIRO CCS PILOT • First CCS pilot project in Brazil • Injection of 100,000 tCO2/year into a saline reservoir • Validation of technologies focused on cost reduction and process safety to enable projects on a commercial scale CCUS HUBS FIRST OPPORTUNITIES We currently have four projects under study (SP, RJ, ES and BA) for both decarbonizing our operations and decarbonizing third party operations (hard-to-abate) 122 R&D Strategy for Low Carbon Products Introducing low carbon products into the fuel and chemical value chains, sustaining markets in hard-to electrify segments and unlocking new business opportunities RENEWABLE FEEDSTOCKS AND CIRCULAR ECONOMY Alternative and residual feedstocks and plastics conversion BIOMETHANE Technologies for production, conversion, certification and marketing, aiming at decarbonization by introducing biomethane into the value chain Sustainable Raw Materials FEEDSTOCK PRETREATMENT TECHNOLOGIES Prototypes of feedstock pretreatment technologies integrated with biorefining processes ENERGY DENSIFICATION OF BIOMASS Technologies for converting lignocellulosic residual feedstocks into biofuels and renewable products Preprocessing BIOFUEL TECHNOLOGIES Technologies for biofuel production integrated with refining, including co processing, SAF, LCAF*, HVO, and bunker fuel with renewable content GREEN CHEMISTRY IN REFINING AND PETROCHEMICALS Technologies for converting residual renewable feedstocks into biofuels and chemicals Conversion / Processing PERFORMANCE AND QUALITY OF RENEWABLE PRODUCTS Developing products with a smaller carbon footprint, supporting market deployment, regulatory positioning, and certification Products *LCAF: Lower Carbon Aviation Fuel. 123 Robust projects are progressing into the portfolio under Implementation BP 2027-31 • Total portfolio of Low Carbon 0.9 0.8 2.0 0.8 5.3 US$ billion 1.3 Evaluation Implementation Onshore Windand Solar PV 3.3 0.6 0.9 CCUS, CVC & Others Low Carbon Hydrogen and Derivatives Ethanol Biodiesel/Biomethane BESS 124 Note: Projections subject to +/- 5% variation. Low Carbon Capex under implementation BP 2026-30 vsBP 2027-31 US$ billion 1.8 0.4 0.01 0.04 0.1 0.04 0.004 1.4 2.0 0.4 0.1 0.2 1.3-0.5 0.2 0.4 0.1 1.3 BP 2026-30 Inflation FX Period Adjustment Normalized BP 2026-30 Wind & Solar BESS, CCUS, CVC & others BP 2027-31 Ethanol Biodiesel/Biomethane BESS, CCUS, CVC & Others Onshore Wind and Solar PV Low Carbon Hydrogen & Derivatives 125 Note: Projections subject to +/- 5% variation. PORFÍRIO Neto DANIELLE Cunha Climate Positioning Pillars Decarbonization as a value lever TRANSPARENCY AND CLIMATE CHANGE MANAGEMENT Governance in information, processes and decisions › Governance up to the BoD › Climate risks integrated into corporate risk management, in line with standards and best practices › Decarbonization incentives (e.g.: reward system with GHG indicators) › Emissions inventory and performance verified by a third party COMPETITIVENESS OF THE O&G PORTFOLIO Resilience and value of the fossil portfolio amid the transition › Asset cost profile aligned with the transition › Decarbonization ambitions and commitments › Energy and emissions efficiency, seeking competitiveness and regulatory alignment › Climate adaptation for operational resilience LOW CARBON BUSINESS, SCOPE 3 EMISSIONS AND JUST TRANSITION Portfolio exposure to carbon › Corporate scenarios expressing transition trends › Profitable portfolio in the context of a low carbon economy and sustainable development › Drivers for capital allocation focused on reducing exposure 127 Scopes 1 & 2 Commitments and Ambitions We have updated and extended the horizon of our climate commitments 2030 Previous Absolute operational emissions1 million tCO2e-30%² Routine flaring million m3 ZERO GHG intensity in the E&P kgCO2e/boe Up to 15 GHG intensity in Refining kgCO2e/CWT 30 Methane emissions intensity in upstream tCH4/thousand tHC 0.20 1 This commitment only considers the business segments in which we are already involved 2 Reference 2015 3Ambition takes into account the Company's willingness to use carbon credits as a complementary strategy 2030 Revised 2035-18%²-20% to -18%² ZERO Up to 15 35 Up to 15 33 - 34 0.20 Ambitions Net Zero by 20503 Near Zero Methane 2030 128 129 We have reinforced our absolute emissions commitment, incorporating 2035 targets aligned with the expansion of the company's activities, under way since 2023, with growth in E&P, gas processing, refining, thermal power generation and fertilizers, along with increased production capacity for renewable fuels and electricity. The emissions trajectory will be supported by operational efficiency gains and a portfolio of GHG mitigation projects. The 2030 commitment reinforces the pursuit of excellence in efficiency, while the 2035 commitment raises the challenge and incorporates the development of decarbonization technologies, seeking to limit peak emissions in the early 2030s and advance on the path to net zero by 2050. 78 56 62 48 46 47 50 64 2015 2020 2021 2022 2023 2024 2025 2030 2035-18% 62 64 Our 2030 and 2035 commitments keep pace with portfolio expansion GREENHOUSE GAS (GHG) EMISSIONS -SCOPES 1 AND 2 MtCO2e Commitments 19.9 15.9 15.7 15 14.2 14.8 14.7 14.1 15 15 2015 2020 2021 2022 2023 2024 20259M26 2030 2035 18.7 Industry average We reinforce our commitment to low emissions intensity in E&P as a competitive advantage 130 Between 2015 and 2025, we reduced our emissions intensity by 26%, while increasing our operated production by more than 50%. Our pre-salt assets maintain a GHG intensity of around 10kgCO₂e/boe, among the lowest in the industry and better than the first performance quartile (12.8kgCO₂e/boe), reflecting their high operational and production efficiency. Even as the growing maturity of our fields makes reducing GHG intensity more challenging after 2030, we have extended to 2035 our commitment to keep it below 15kgCO₂e/boe. GHG INTENSITY in E&P kgCO2e/boe Commitments We play a leading role in methane emissions management We reduced our methane emissions intensity by 65% between 2015 and 2025 UPSTREAM METHANE EMISSIONS INTENSITY tCH4/thousand tHC 0.65 0.44 Commitment 0.20 0.32 0.25 0.22 0.20 0.23 0.23 2015 2020 2021 2022 2023 2024 2025 9M26 2030 Monitoring We adopt industry best practices in monitoring and managing methane emissions, committed to transparency and the quality of reported data. In October 2026, Petrobras was awarded the In 2025, methane intensity increased due to improvements in monitoring, quantification and reporting processes associated with OGMP 2.0 actions. ROADMAPTO NEAR ZERO METHANE 2030 Current intensity level Venting Category 1 Category 2 Category 3 Category 4 Category 5 Operational actions and adaptations to reduce vented gas Flaring Reduction of gas sent to flare and higher methane destruction efficiency in combustion Fugitive Leak detection and repair (LDAR) Near Zero Methane OGMP 2.0 Gold Standard. Mitigation Our methane mitigation initiative focuses on reducing gas losses associated with fugitive emissions, flaring and venting. It is the Carbon Neutral Program's main lever to achieve our methane commitment and the near zero methane ambition by 2030. 131 LDAR- Leak Detection and Repair. 15% improvement in Refining emissions intensity performance over 10 years Since the launch of the Carbon Neutral and RefTOPPrograms, operational and energy efficiency initiatives have helped avoid around 5.9 million tCO₂e. New investments of more than US$ 1 billion planned over the five-year period seek an additional reduction of around 2 million tCO₂eper year by 2030. We have updated the 20302commitment to 35kgCO₂e/CWT and extended the horizon to 2035, with a range between 34 and 33 kgCO₂e/CWT, reaffirming our dedication to continuous improvement supported by structural programs such as RefTOPand Carbon Neutral. 43 40.2 39.7 37.9 36.8 36.2 36.7 37.2 35 2015 2020 2021 2022 2023 2024 2025 9M26 2030 2035 20302 33 We seek greater Refining competitiveness with a new 2035 commitment GHG INTENSITY in REFINING kgCO2e/CWT 132 34 2Itwasupdatedtoreflectthehigherprocessingcapacity,strengtheningPetrobras'contributiontonationalenergy security. Commitments 1Methodologicalmeasurementadjustmentin2026,witha+0.5impactontheresult.Previoushistoricalvalues unchanged. 1 Levers to mitigate emissions over time Carbon Neutral Program deepens opportunities 2015 2025 Portfolio Process efficiency Energy Losses CCUS Target 2030 Energy optimization Replacement of machinery and equipment Improvement in industrial processes Electrification Use of biofuels Integration with renewables Replacement of energy sources Reduction of flaring Leak detection and repair (LDAR) Reduction of methane venting Portfolio: increase in emissions resulting from the increase in the company's activity: growth in E&P, gas processing, refining, thermal power generation, fertilizers and production capacity for renewable fuels and electricity. US$ 4.8 billion INVESTMENTS IN EMISSION MITIGATION FROM 2027 TO 2031 14% higher than BP 2026-30 Scopes 1 & 2 12 Decarbonization Fund projects contribute 0.24 MMtCO2e by 2030 133 R&D Strategy for Decarbonizing Operations Net Zero 2050 ambition supported by promising technologies, gaining maturity and reducing costs over time TECHNOLOGIES TO REDUCE FUEL CONSUMPTION • Process optimization • Energy integration • Machinery modernization • Reduction of steam, condensate and electricity losses • New heat exchange technologies • Digital solutions Operational Efficiency METHANE MONITORING AND MITIGATION • Leak detection and repair • Replacement of emitting equipment • Capture and recovery of flared or vented gas • Digital solutions Loss Reduction LOW CARBON ENERGIES • Machinery electrification • Heat Pumps and Electrothermal Systems • Power from shore • Wind and solar generation • Batteries (BESS) • Use of biofuels in operations • Nuclear generation (SMR) Energy Mix LOW CARBON HYDROGEN AND RENEWABLE FEEDSTOCKS • Biomethane and Ethanol for H2 • Electric Reformer • Electrolysis • Pyrolysis • H2recovery • Renewable feedstocks in FCC Industrial Processes CARBON CAPTURE, UTILIZATION AND STORAGE • Pre-combustion and post-combustion capture • Oxy-combustion • CO2 conversion and use • CCUS hubs CCUS 134 Product portfolio projections Portfolio GHG emissions intensity¹ Potential to maintain, in 2030, the 2022 level, with a prospective reduction of up to 2.5% by 2035 ¹ Product portfolio metrics consider the total portfolio (Implementation + Evaluation). Product Portfolio¹ Renewable fuel production capacity Expansion of renewable fuel production capacity by up to 5.5x (50 thousand boed) in 2030 and 10.3x (92 thousand boed) in 2035, compared to 2022 Renewable electricity generation capacity Potential to reach up to 21% (around 1.3 GW) of installed electricity generation capacity from renewable sources in 2030 and 24% (1.7 GW) in 2035 135 Investments of US$ 13.5 billion in energy transition 11% of total BP 2027-31 investments DECARBONIZATION EMISSION MITIGATION US$ 4.8 billion E&P, RTM and G&P US$ 3.5 billion RENEWABLES AND PROFITABLE DIVERSIFICATION LOW CARBON US$ 2.6 billion Wind, Photovoltaic and others US$ 1.7 billion Decarbonization Fund US$ 1.3 billion Hydrogen US$ 0.6 billion BIOPRODUCTS US$ 4.1 billion Ethanol US$ 1.5 billion Biorefining US$ 1.7 billion CCUS, CVC and others US$ 0.3 billion Biodiesel and Biomethane US$ 0.9 billion R&D LOW CARBON US$ 2.0 billion 23% of the total R&D budget in 2027, reaching 40%by the end of the period 136 ANDREA Givigi HILTON Forlani Engineering, Technology and Innovation focused on value generation and capital discipline Maximize value generation throughout the project life cycle • Value generation from assets over their entire life cycle, with attention to performance, integrity and operational efficiency, safety and emissions reduction • Value generation from engineering projects focused on costs, reliability, predictability, anticipation opportunities and capacity increase • Value maximization in decommissioning Ensure resource readiness within the required time, cost and quality • Resource readiness at optimal levels for planned deliveries • Supplier market engagement to increase process competitiveness • Fostering optimization, standardization and replication of projects Innovate to optimize assets and enable future projects and new businesses • Implementation of R&D and technology portfolio integrated with business needs • Develop new businesses and expand into new markets • Digitization, automation, and adoption of AI 138 We have achieved higher Capex execution, with on-time delivery and capture of anticipation opportunities We enhanced our planning process, with focus on predictability and on-time delivery PETROBRAS INVESTMENT US$ billion Planned Execution 24 – 25.5 Start-up predictability Projects BP 2024-28 Execution Búzios 8 P-79 Búzios 6 P-78 Mero 4 Alexandre de Gusmão Búzios 7 Almirante Tamandaré 2026 2026 2025 2025 2025 2025 2025 2025 Ahead of schedule 2020¹ 2021 2022 2023¹ 2024¹ 2025 2026¹² Average under execution of ~20% ¹ Initial Business Plan estimate. Subsequently revised. ² Forecast through Dec/26. Higher level of Capex execution REVAP HDT REPLAN HDT RNEST Train 1 2026 2025 2025 2025 2025 2025 Ahead of schedule Ahead of schedule 139 Planned Capex for 2027 and 2028 incorporate major project milestones and capture of anticipation opportunities Capex over the life cycle of an E&P project1 %TOTAL SUBSEA 25% – 40% WELLS 15% – 25% TOPSIDE 40% – 55% 85 – 95% 65 – 80% Capex of the main E&P production systems Current investment Complementary 2 Subsea Wells Anticipation effort to accelerate 1st oil and ramp-up 1st oil Peak production 2027 and 2028 Investment Highlights • Ramp-up of Búzios 8 • Start-up and ramp-up of Búzios 9,10 e 11 • Construction of production units of Atapu 2 (P-84) and Sépia 2 (P-85) • Well drilling and completion of Búzios 10, 11, Atapu 2 e Sépia 2 Topside • Start-up of ADU3 for RNEST Train 2 in 2027: + 50 thousand barrels of capacity • Progress on construction of RNEST Trem 2, Boaventura Refining, and UFN-III: over 20,000 contractors mobilized 2027 2028 2029 2030 2031 Notes: Share of each discipline in total project Capex; projections subject to variation of ±5%. (1) Refers to pre-salt projects with owned units and capacity of 180 to 225 kbpd (Búzios 6, 8, 9, 10 and 11; SEP-2; ATP-2); other portfolio projects have different investment proportions. (2) Complementary projects with more than 5 MM boe of cumulative production. (3) Atmospheric Distillation Unit. (4) HEFA - Hydroprocessed Esters and Fatty Acids • RPBC HEFA4 with key contracts signed 140 Integration of disciplines enables production growth INTEGRATED TEAMS project, engineering, and risk management Búzios 8 (P-79) Start-up 3 months ahead of BP 2026-30 Búzios 6 and 8 (P-78 and P-79) record times for gas and water injection COMMISSIONING with reduced offshore scope Búzios 9 and 10 (P-80 and P-82) Crewed sailaway enables early commissioning activities RESOURCE READINESS • RNEST and Boaventura:Process improvement and market engagement support procurement • In 2026, 45% of pipelines tied in and 74% of Wet Christmas Trees (WCT) installed were reused • An integrated view of completion, tie-in and start-up favors readiness of priority wells: around 90% of new-well production achieved, with the target projected to be met 100 50 Wells tied-in and production per year 77 63 3000 2500 2000 55 56 34 51 25 34 48 57 46 1500 0 * Actual figures as of Nov 23 and projected through Dec/26. 1000 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026* Sustained high level of tie-ins contributing to growth of the production curve TIE-IN INTEGRATION HUB synchronizes critical support re maximize the number of wells ti 141 Successful strategies drive consistent ramp-ups even in more complex projects Continuous improvement of ramp-ups • Earlier readiness of wells, topside and subsea systems • Intensified pre-operational activities while still at the shipyard • Crewed sailaway • Integrated planning to anticipate authorizations, licenses and ANP inspection at the shipyard Ramp-up duration of pre-salt units* 18 Months FPSO Almirante Barroso (Búzios 5) record of < 5 months FPSO Almirante Tamandaré reaches production of 225 kbpd in <6 months 0 2010 2011 2012 2013 P-78 – Búzios 6 2014 • 1st gas injection in Mar/26 61 days after 1st oil 2015 • 1st water injection 253 days after 1st oil - record among owned FPSOs 2016 2017 2018 2019 2020 2021 P-79 – Búzios 8 2022 2023 2024 2025 • Start-up in May/26 3 months ahead of BP 2026-30 schedule • 1st gas injection in Jun/26 56 days after 1st oil - Record among owned FPSOs • Peak production in Oct/26 (10 months) • 2nd producer in Jul/26 79 days after 1st oil - Record among owned FPSOs 142 * Platforms with production capacity exceeding 150 kbpd. We increased production capacity with no additional investment in the platforms ADDITIONAL CAPACITY IN 2026 We are authorized to expand production capacity by up to 282 kbpd The additional volume produced in 2026 corresponds to 7 days of Petrobras' production 143 Average gain of 87 kbpd in the year* in operated production Figures refer to additional production authorization + 11 kbpd Atapu P-70 Itapu P-71 + 19 kbpd Búzios 2 P-75 + 10 kbpd Búzios 4 P-77 + 10 + 19 kbpd Búzios 5 FPSO + 24 kbpd Alm. Barroso + 45 kbpd Búzios 7 FPSO Alm. Tamandaré kbpd + 45 kbpd + 20 kbpd Búzios 6 P-78 Mero 1 FPSO Mero 2 FPSO Mero 3 FPSO Mal. Mero 4 + 45 kbpd FPSO Alexandre Guanabara We have 6 more units with planned capacity increase Búzios 8 (P-79) Búzios 9 (P-80) Sepetiba Duque de Caxias de Gusmão + 34 kbpd Búzios 10 (P-82) Búzios 11 (P-83) Atapu 2 (P-84) Sépia 2 (P-85) Note: The platforms' capacity increase is enabled by using design margins, while maintaining compliance with safety and conformity requirements. *Based on October/26 close. Ambition to increase by 10 to 20%, with additional capacity of up to 260 kbpd 143 FPSO optimization to mitigate inflationary pressure ENGINEERING GUIDELINES AND PHILOSOPHIES COSTS Review of guidelines applied to equipment and systems Application of value engineering and training in engineering metrics and costs LEVERS TO ESTIMATES AND CONTROLS Improvements in project cost estimating and management REDUCE WEIGHT AND PROJECT SCHEDULES Reviewing deliverables in conceptual and basic projects and their critical paths COST RELIABILITY AND SUPPLIERS PROJECT COMMISSIONING Shorter schedule, lower cost, streamlined scope Supplier development, reliability assessment, and redundancy strategy TOPSIDE WEIGHT REDUCTION WITH PROPORTIONAL CAPEX REDUCTION SEAP ~5k ton-10% % Albacora ~5k ton-13% Búzios 12 ~11k ton-17% topside weight reduction observed, proportional to Capex reduction REVIT Tupi ~26k ton-51% 144 Project standardization and industrialized subsea solutions for schedule and cost savings Project standardization asset/component interchangeability Product specifications with intensified early supplier involvement (ESI) Qualifications outside the project critical path Defined schedule for product platform upgrades POTENTIAL COST AND SCHEDULE SAVINGS ~50% reduction in pipeline investment 30% Capex reduction in the subsea system 70% reduction in material variability PLV fleet New procurement approach for flexible pipelines, including pipe-by-the-meter InterchangeableWCT platform with new functionalities, piloted in the Mero Extension project Standardizationof well resources: interchangeabilityacross projects Alternative procurement model to traditional EPCI –Greater flexibilityfor projects 145 Advanced well engineering solutions enhance results in new exploratory frontiers MORPHO –Equatorial Margin Three Oil Discoveries in a New Frontier Pioneer Well Amapá Deep BLOCK FZA-M-59 WI PB 100% • Well drilling enabled by advanced engineering solutions, such as technologies for strict pressure management during drilling. Waters Colombia Campaign New exploratory frontier PAMA • 175 km off the coast of Amapá BARREIRINHAS • water depth of 2,900 meters • final depth ~7,000 meters CEARÁ POTIGUAR Completion of Petrobras' largest exploratory campaign outside Brazil • 5 wells drilled • 2 formation tests • ~2.5 years Sandia-1 Well • Drilled in 48 days • Progress of 86 meters per day • Best-performing well ever drilled in Colombia's deep waters 146 Critical Resource Management remains focused on maximizing portfolio value • We enhanced our rig and PLSV analysis model, now incorporating interdependence between resources and the impact of project portfolio risks on their requirements • We seek technical specifications that allow flexible resource allocation¹, balancing Opex, Capex and Decommissioning activities • Procurement strategy aligned with market monitoring and long-term demand Estimated average five-year expenditure distribution CAPEX DRILLING RIGS Well drilling & completion ~70% OPEX Decommissioning SUBSEA SUPPORT VESSELS Tie-ins and equipment install. Workover ~10% Mooring operations and rig support Subsea inspection and maintenance P&A 2027-2031 ~250 wells to be drilled and completed ~280 wells to be tied-in ~200 plug and abandonment (P&A) interventions on subsea wet-tree wells ~20% Decommissioning of lines, equipment, and production units 1We also address demands through integrated contracts (EPCI/EPRD) as well as service contracts employing subsea vessels outside the fleet pool. ~60% ~30% ~10% 147 SEAP 1 P-81 120 kbpd WI PB 69% Mero Extension REVIT Tupi ICSPB Entorno Forno REVIT BRC/CRT REVIT MLS/MLL Búzios 12 P-91 Sirius 2031 Pre-salt Post-salt Non-operated Project w/o FPSO In production 2027 Búzios 9 P-80 225 kbpd WI PB 89% Búzios 10 P-82 225 kbpd WI PB 89% Búzios 11 P-83 225 kbpd WI PB 89% 7 Compl. Projects 2028 Raia 126 kbpd WI PB 30% 10 Compl. Projects 2029 Atapu 2 P-84 225 kbpd WI PB 66% 14 Compl. Projects REVIT Albacora P-88 SEAP 2 P-87 120 kbpd WI PB 86% Sépia 2 P-85 225 kbpd WI PB 55% 2030 10 Compl. Projects Consistent pipeline of new production systems and complementary projects 2032+ TO BECONTRACTED Around 100 new wells from complementary offshore projects in Brazil over the five-year period, maximizing reservoir recovery rate and leveraging installed capacity on existing units Includes only Complementary Projects w/ cum. prod. > 5 MM boe. ~200 MM boeover the five-year period Sépia 3 Búzios 8 P-79 180 kbpd WI PB 89% 2026 6 Compl. Projects 8 Compl. Projects 148 Búzios Field Búzios consolidates as the largest producing field, with start-up of three new units in 2027 RJ Santos Basin Campos Basin 2026 Búzios 6 P-78 peak in Oct/26 Búzios 8 P-79 in ramp-up 8 FPSOs in operation 1.33 MM bpd of installed capacity 3 FPSOs under implementation >2 MMbpd of installed capacity in 2027 1 FPSO under procurement Under implementation 2027 Búzios 9 P-80 sailing to Brazil Búzios 10 P-82 sailing to Brazil Búzios 11 P-83 Preparing to leave the shipyard 149 RJ Strong execution of the Atapu 2 and Sépia 2 FPSOs is Campos Basin platforms Santos Basin underpinned by lessons learned from our recent owned Atapu Sépia New Technologies implemented on P-84 and P-85 All Electric System Electrification of topside processing systems DHSV-e Electrification of the downhole safety valve PACI-e (All-electric intelligent completion) • Improved reliability (above 90%) • Real-time well monitoring • Fewer interventions and lower Capex • Supplier development to eliminate technological dependence in the market Under implementation 2029 Atapu 2 • P-84 • Module lifting campaign started, modules in progress • EPCI contracted • Well drilling and completion campaign underway • First WCTs received 2030 Sépia 2 • P-85 • Hull and topsides modules under construction • EPCI contracted • • • Well drilling and completion campaign underway First WCTs received Preliminary License (LP) issued (Stage 4) • Preliminary License (LP) issued (Stage 4) 150 FPSO projects under procurement add 300 kbpdof oil capacity BÚZIOS 12 • P-91 FPSO with capacity of 180 kbpd Capacity optimizations: • 17% reduction in topsides weightcompared to original assumptions, prior to contract award • Greater gas monetization and expanded supply to the Brazilian market: The unit will enable gas offtake, which will be routed to the Boaventura Energy Complex via the Route 3 pipeline REVIT ALBACORA • P-88 1 FPSO Production capacity of 120 kbpd of oil and up to 4.3 MMm3/d of gas Under procurement – negotiation stage Start-up scheduled for 2031 151 Decommissioning portfolio remains significant over the five-year period CEARÁ BASIN POTIGUAR BASIN SE/AL BASIN 15 2027-31 period 27 production units to be removed • 17 fixed • 6 floating • 4 semi-submersible 68% US$ billion 11.2 32% CAMPOS BASIN SANTOS BASIN 4 8 + US$ 0.4 billion in Financial Commitments ~ 500 WELLS with abandonment interventions* 59% Dry-tree completion 41% Wet-tree completion 2032 and beyond 40 production units to be removed • 32 fixed • 7 floating • 1 semi-submersible Number of production units exiting over the five-year period * Offshore wells. ~ 1,900 km of flexible lines to be recovered 152 BOAVENTURA Refining RPBC HEFA Refining, Logistics, and Low Carbon Energy projects targeting capacity expansion and higher product quality SANTOS TERMINAL On-site (STS08A) Expansion of logistics capacity To be contracted Fertilizers OBAPI Heavy distillates SANTOS TERMINAL Pier and Dredging (STS08A) NEW LIGHT PRODUCTS PIPELINE Midwest BOAVENTURA HEFA RPBC FCCU –Machinery OSBRA REGAP Coke REPLAN ATJ REFAP HDT RNEST Partial Delivery Train 2: ADU RECAP Combustion Boiler RNEST Train 2 REPLAN REVAMP Blower REDUC REVAMP Flare REPLAN REVAMP Coke (U-980) REDUC REVAMP FCCU Machinery REDUC REVAMP Thermal Power Plant Renewables Refining expansion/adaptation SANTOS TERMINAL (STS08) 2026 2027 2028 2030 2032+ CCS PILOT São Tomé UFN-III 2029 REPLAN REVAMP Coke (U-980A) REPAR NewMedium Oil Products HDT H2V –Hydrogen Hub São Paulo REPLAN HDS 2031 153 Main projects Refining and fertilizers: capacity expansion underway Boaventura Refining Start-up in 2029 + 76 kbpd S10 diesel + 20 kbpd jet fuel + 12 kbpd low-sulfur lubricant oils • All packages contracted and mobilized • ~10,000 contractor workers mobilized • Lifting of the first HCC reactor started • Largest lifting operation in the history of refining in Brazil Second HCU Reactor (pictured) Rnest–Train 2 Start-up in 2029 + 130 thousand barrels of capacity 70% conversion to S-10 Diesel (ADU in 2027 = 50 thousand barrels) • Main packages contracted and mobilized • ~8,800 contractor workers mobilized • Assembly and start-up of Coke Yard 1 completed • Assembly and delivery of the Workshop buildings completed UFN-III Start-up in 2029 Resumption approved in April, 4 months ahead of schedule + 3,600 t/d of urea (15% of domestic demand) + 177 t/d of ammonia for sale • All packages contracted • Mobilization underway, started in Jul/26 • ~1,800 contractor workers mobilized 154 Refining Portfolio Complemented by Sustainability and Energy Efficiency Projects RPBC HEFA First dedicated plant for bio-jet fuel and Renewable Diesel 15 kbpdof bio-jet fuel and Diesel R Start-up scheduled for 2030 • Environmental licenses issued • Main contracts signed BOAVENTURA HEFA Second dedicated plant for bio-jet fuel and Renewable Diesel 19 kbpdof bio-jet fuel and Diesel R Start-up targeted for 2032+ • Project in planning phase Improving energy efficiency, operational availability and sustainability of the refineries REPLAN REVAMP FCCU -Blower Electrification of the centrifugal blower assembly (ongoing) REVAMP Coke Processing capacity expansion from 6,800 m³/d to 7,500 m³/d (under procurement) RPBC REVAMP FCCU -Machinery Electrification of large machines (ongoing) RECAP REVAMP FCCU CO Boiler Installation of new CO boiler and STG (ongoing) REDUC REVAMP Flare Implementation of a new header drainage system (ongoing) REVAMP Thermal Power Plant Installation of a new cogeneration unit, new steam turbine generator, new CTS and new substation (under procurement) REVAMP FCCU Replacement of large machines (under procurement) REGAP REVAMPCoke (under procurement) FCCU -Fluid Catalytic Cracking Unit CO - Carbon Monoxide CTS - Condensate Treatment Station STG -Steam Turbine Generator 155 Logistics projects to expand capacity and upgrade storage and outflow infrastructure Alemoa Terminal Santos - SP Outflow of products from the four São Paulo refineries SCOPE • On-site (ongoing), start-up in 2027 • Pier and Dredging, start-up in 2032+ OBAPI Barueri-Caminho de Pilões oil pipeline Ensure operational continuity by relocating the pipeline to a new lane SCOPE • Replacement and relocation of the OBATI¹ heavy distillates pipeline • Start-up in 2032+ 156 1 Barueri-Utingaoil pipeline.. CCS pilot project paves the way for portfolio evolution São Tomé CCS Pilot • 2029 • 100 thousand tCO2/year • Capture and conditioning capacity Project in procurement phase, with part of the scope already contracted Carbon Capture and Storage project to remove CO2 from the Cabiúnas Gas Treatment Unit (UTGCAB), transport it by pipeline and inject it into the São Tomé saline reservoir, located at the Barra do Furado Station 157 Expansion of R&D and technology portfolio integrated with business needs US$ 5.7 billion¹ in R&D&I in BP 2027-31 23% of the total R&D&I budget in 2027 allocated to low-carbon, reaching 40% by the end of the period TOTAL R&D&I CAPEX BP 2027-31 ~US$ 2.0 billion in Low Carbon 65% 35% Low carbon O&G, HSE and Social Impact EXPRESSIVE INNOVATION OUTCOMES +1,500 active patents, with increasing number of annual filings 178 184 120 128 144 2021 2022 2023 2024 2025 + R$ 6.7 billion in new partnerships* + 1,100 + 300 Ongoing partnerships Challenges Published per year * since 2019 158 ¹ Excludes infrastructure investment of ~US$ 700 MM. R&D Portfolio Management Technology Programs acting as structuring drivers of innovation focused on business challenges NEW FRONTIERS AND RESERVES REPLENISHMENT OPERATIONAL EFFICIENCY OF E&P ASSETS LOW CARBON PRODUCTS AND NEW ENERGIES DECARBONIZATION OF OPERATIONS PILLARS ENVIRONMENT SAFETY 159 DIGITAL We turn business challenges into opportunities for innovation and value generation Carbon resilience • HISEP (pictured) CO2 separator with emissions reduction potential (under testing) • São Tomé CCS Pilot with storage scope of 100 thousand t/year of CO2, ongoing Renewable sources and cleaner products • Methane emissions measurement and reduction technologies using sensors, drones, aircraft and satellites (OGMP) • SAF/HVO production in a dedicated plant –FID approved (RPBC HEFA) • SAF via coprocessing (REPLAN) • Launch of CAP Pro R,the first asphalt with renewable content produced in Brazil • Rig Emissions Digital Twin –supports performance and emissions management. Delivers a reduction of 35 thousand ton CO2 SAF -Sustainable Aviation Fuel. HVO –Hydrotreated Vegetable Oil. HEFA - Hydroprocessed Esters and Fatty Acids. • Coprocessing of biomass pyrolysis oil or bio-oil in the FCC 160 We turn business challenges into opportunities for innovation and value generation Operational Efficiency and Automation of Operations • ICARO –reservoir management software delivers gains of more than 3 kbpd in Jubarteand Tupi • Digital Twins of offshore asset subsystems (e.g. Flexible Pipelines, Wells, Mooring etc.) generate value by anticipating events, planning interventions, reducing risk exposure and avoiding losses or shutdowns • PACI-e -All-electric intelligent completion offers value generation potential through higher recovery factor / production and lower Capex • Hull Cleaning Robot: Up to 90% reduction in employee hours exposed to risk in rig hull cleaning operations for biofouling removal. • Use of RWI in the Búziosand Tupifields aiming at higher injection efficiency Asset Integrity and Operational Risk Reduction critical rig operations • Riser Robotic:AI applied to monitor risk exposure in • Solutions to mitigate SCC-CO2 (Tipt, Composite Subsea Pipeline and Flexible Pipeline qualification) reduce technical and schedule constraints in implementation • Robotics and Drones (pictured) reducing employee-hours exposed to risk in asset inspection and maintenance • Insertable DHSV applications (downhole safety valve) with estimated savings of US$ 700 MM in the coming years 161 SCC-CO2 – Co2 Stress Corrosion Cracking. We turn business challenges into opportunities for innovation and value generation New Production Frontiers Eq. Margin and Pelotas Basin • Oil Migration Assessment using satellite imagery and geochemical markers, improving exploratory risk assessment Decommissioning Complementary projects • AICD: Autonomous Valves that restrict water production by 30%, aiming to increase the recovery factor by 3%; application planned in the Campos Basin • Subsea Reel Drive (pictured)–Petrobras patent for installing and recovering pipelines close to the seabed, with potential to reduce costs, environmental risks and dependence on PLSVs, while increasing safety • PWC-TTthrough-tubing well abandonment solution, without necessarily pulling the production tubing, potentially reducing time, cost, operational exposure and environmental impact 162 Active collaboration with suppliers to overcome a challenging market and preserve future execution capacity for Petrobras' projects Collaboration with suppliers Active listening, integrated view of supply chain and predictability • Periodic senior management visits to shipyards and industry • Early engagement for technical specifications • Encouraging partnerships technologies • Joint development of new • Strengthening the local supplier base Local Content to provide the capacity to sustain operations when global supply chains face disruptions • Ensuring Business Plan execution through a competitive domestic supplier market challenges • A stronger domestic supplier industry is a competitive advantage and mitigates • It should be encouraged to overcome market inertia, while always pursuing autonomy, exports, technology and economies of scale Execution in Brazilian shipyards • An estimated 200,000+ tons of FPSO modules built in Brazilian shipyards through 2031* • An estimated 21,000 tons to be built in Brazilian shipyards with the construction of 8 RSVs Workforce qualification • Autonomy & Income Program • ANP Human Resources Training Program 163 * Actual since 2023 plus projected through 2031. Our demands for the next five-year period Main procurement TOPSIDE FPSO SUBSEA PLSVs Other vessels Flexible pipelines Rigid pipelines Wet Christmas Trees (WCTs) WELLS Drilling rigs Well materials and services REFINING, GAS & POWER AND LOGISTICS C&A contracts Critical equipment INNOVATION ESTIMATED FIGURES 2 FPSOs UNDER PROCUREMENT 7 FPSOS UNDER STUDY ~1,000 KM WELL TUBULARS (OCTG) ~7,000³ KM RIGID AND FLEXIBLE PIPELINES AND UMBILICALS ~200 INTEGRATED DRILLING CONTRACTS ~300 WCTs 17 PROJECTS AND ~300 EQUIPMENT ITEMS REFINING, GAS & POWER AND LOGISTICS ~140 COMPLETION SYSTEMS 9 EPCIs 16 EPRDs ~1,400 OPEN INNOVATION CHALLENGES FROM 20 TO 28 RIG FLEET2 FROM 85 TO 95 FLEET OF SUBSEA SUPPORT VESSELS 1, 2 1 Includes AHTS, RSV, PLSV, SDSV, MPSV. 2 Expected fleet level, considering maintenance of current contracts, termination of contracts and new procurement. 164 3 Considering installations and recoveries. ALESSANDRA Moura JULIANA Esmeraldo JANAÍNA Sala Our ESG positioning REDUCE CARBON FOOTPRINT Operate our business with integrity in a safe and sustainable way, seeking to reduce emissions, promoting diversity and social development, and contributing to a just energy transition Net Zero 2050¹ Ambition Near Zero Methane 2030 Ambition PROTECT THE ENVIRONMENT Zero Leak Ambition TAKE CARE OF PEOPLE Zero Fatality Ambition ACT WITH INTEGRITY Ambition to be a reference in ethics, integrity and transparency 167 1 Considers the Company's willingness to utilize carbon credits. Protect the environment Commitments 25% reduction¹ in our freshwater withdrawal by 2030 (113 million m³/year), with a focus on regions experiencing higher water stress 80% of solid waste from operational processes directed to Reduce, Reuse, and Recycle (RRR) pathways² by 2030 Achieve biodiversity gains by 2030, with a focus on forests and oceans • Achieve a positive balance in vegetated areas by 2030 • Increase biodiversity conservation by 30% by 2030¹ • Invest R$ 1 billion³ in Biodiversity R&D&I projects by 2030 1Reference year: 2021. 2 Reuse, recycling and recovery. 3 Accumulated investment over the period from 2025 to 2030. 168 Water security 25% reduction¹ in our freshwater withdrawal by 2030, with a focus on regions experiencing higher water stress Freshwater use in 2025 (MM m³) in 2030 113 MM m3/year FRESHWATER WITHDRAWN MM m3/year WITHDRAWAL 74% 113 REUSE 26% REÚSO 26% 40 151 122 115 112 113 127 113 • Freshwater withdrawal accounts for less than 2% of total water use by Brazil’s industrial sector 2021 2022 2023 2024 2025 2026* 2030 Refining Energy Others *2026: projection based on actual results through October and targets for November and December. REUSE AND LOSS REDUCTION (2021–30): 25% ~ 54 projects/initiatives Avoid the withdrawal of approximately 44 million m³ of water (equivalent to the annual water consumption of 660,000 people) NEW SOURCES: EXTERNAL REUSE – REDUC, REGAP, Boaventura Energy Complex RAINWATER HARVESTING - Expansion of rainwater capture for industrial use (e.g., RNEST) 169 ¹ Base year: 2021. Target revised to incorporate new business segments (e.g., fertilizers). Circular economy We prioritize the sustainable disposal of waste by expanding reuse and recovery opportunities 80% of solid waste from operational processes directed to reuse, recycling, and recovery pathways by 2030 % OF REUSE, RECYCLING OR RECOVERY OF SOLID WASTE 76% 76% 75% 78% 68% 2021 80% 80% 78% 2022 2023 2024 2025 %RRR Present 2026 2026* Projection 2030 *2026 actual results through September; projections based on monthly targets for the remaining months of the year. in 2030 80%RRR Coprocessing of oily sludge and sludges Expansion of RRR pathways for construction waste and organic waste RRR destination pathways for Fluid Catalytic Cracking waste 170 Biodiversity gains Invest R$ 1 billion in Biodiversity R&D&I projects by 2030 (cumulative investment for 2025–30) in em 2030 R$ 1 billion 2030 Achieve a net positive balance in vegetated areas by 2030 Increase biodiversity conservation by more than 30% by 2030 Protection of endangered wildlife Promote biodiversity conservation and restoration initiatives by 2030 in 2030 in 2030 >0 Net Gain in vegetated areas +30% Biodiversity efforts INCREASE OF +30% IN BIODIVERSITY CONSERVATION THROUGH RESPONSIBLE SOCIO-ENVIRONMENTAL INVESTMENT BY 2030 56 species ACHIEVE BIODIVERSITY GAINS BY 2030, WITH A FOCUS ON FORESTS AND OCEANS 73 species Restoration and conservation of biomes Management of protected environmental areas 175 thousand hectares 228 thousand hectares 25 million hectares 33 million hectares 2021 2030 Increased funding for socio-environmental investments in oceans and forests Activities across all Brazilian biomes, supported by a holistic approach that integrates biodiversity considerations into all environmental projects 171 Act with integrity VOLUNTARY TARGETS Promote diversity in Petrobras nominations to positions in investees • Maintain, through 2030, a minimum of 30% women in statutory body positions nominated by Petrobras in its equity investees • Achieve by 2028, and maintain through 2030, a minimum of 20% self-identified Black individuals in statutory body positions nominated by Petrobras in its equity investees • Ensure, by 2030, the conclusion of sexual harassment investigations within an average timeframe of 60 days • 100% of relevant suppliers trained in integrity and/or privacy by 2030 • Implement human rights due diligence across 100% of relevant suppliers by 2030 • Assess the expansion of ESG requirements in 100% of procurement processes within strategic categories by 2028 • Ensure that 70% of relevant suppliers have publicly disclosed their GHG (Greenhouse Gas) emissions inventories by 2028 Our commitment to diversity is also reflected in compliance with Law No. 15,177/2025, which establishes a minimum threshold of 30% women on the boards of directors of state-owned enterprises and mixed-capital companies, including reserved seats for Black women and women with disabilities. The law provides for gradual implementation (10%, 20%, and 30%) and establishes sanctions in case of non-compliance 172 Take care of people • Deliver a return to society of at least 150% of the amount invested in voluntary social and environmental projects by 2030¹ • Rank among the top three O&G companies in the human rights ranking by 2030² • Promote Diversity, Equity, and Inclusion: • Women in leadership: 26% by 2027, sustained through 2030 • Black people in leadership: 28% by 2030 • Implement 100% of the commitments of the Mind in Focus Movement (UN Global Compact) by 2030 • Implement 100% of the strategic objectives of the WHO Global Action Plan on Physical Activity in the workplace by 2030 • Implement 100% of four pillars of the Workforce Nutrition Alliance by 2031 ¹ Return measured per project over a three-year period. ² Assessment by the Corporate Human Rights Benchmark. 173 Petrobras’ Governance OUR GOVERNANCE SYSTEM The Board of Directors sets the general direction of our business, establishing our mission and strategic objectives Ensures technical decisions Prevents undue interference Ensures the approval of projects with a foreseeable economic return Executive Board responsible for managing the business and its results Specialized statutory committees responsible for advising on decisions made by executive officers, the Executive Board, and the Board of Directors IN ADDITION, WE ARE OVERSEEN BY VARIOUS REGULATORS Decision-making is supported by technical analyses and legal and compliance opinions CVM and SEC (investor protection) CGU (Office of the Comptroller General) TCU (Federal Court of Accounts) SEST (oversight of governance practices) CADE (antitrust authority) Independent Governance and Compliance, Internal Audit, Ombuds Office, and Inspector General functions External whistleblower hotline, with guarantees of anonymity and protection against retaliation 174 Project Approval Governance Capital investment projects are approved for the execution phase only when they show a positive NPV in all three scenarios* Entry into the Plan’s project portfolio Projects must be strategically aligned and expected to have a positive NPV Initial planning stage: does not mean authorization to proceed with execution Project Development Internal procedures establish criteria and stages for investments and divestments Implementation Decision Demonstration of technical and economic feasibility: review groups and Statutory Technical Committees, with executives bearing fiduciary responsibility for their opinions Projects exceeding US$1 billion require Board of Directors approval, with an opinion from the Investment Committee Energy Transition projects have lower approval authority thresholds *Exploratory projects (including participation in bidding rounds), ongoing investments (e.g., maintenance), as well as partnerships, acquisitions, and divestments follow specific approval procedures. 175 Approval process independent from the Project Team 176 HUGO Costa LAYLABorghi Integrated view of the Strategic Plan CONTEXT — Short-term price volatility and long-term energy transition OUR PURPOSE — Provide energy that ensures prosperity in an ethical, fair, safe and competitive way 2027-31 BUSINESS PLAN Value capture with a unique portfolio — • Capital discipline • Financial strength • Consistent returns Record production trajectory — • Reserve replacement • Greater efficiency and operating capacity RTM monetizing reserves — • Greater oil processing capacity • High-quality products Gas, power and low carbon — • Competitive and integrated operations • Profitable diversification Engineering and innovation — • Value creation throughout the project life cycle • Greater readiness and innovation A more sustainable future — • ESG commitments • Safety • Solid governance • Diversity ALL THIS VALUE CREATION IS ENABLED BY TECHNOLOGY • Infrastructure • Scalability • Strategic use of data and AI PROCESSES • End-to-end optimization • Simplification • Organizational agility PEOPLE • Pride in belonging • Knowledge management • Incentive alignment 178 Digital Technologies: Investment that delivers results Infrastructure and solutions across Petrobras’ entire value chain Significant innovation achievements through 2026 INVESTMENT IN DIGITAL TECHNOLOGIES 2027-31 BP 23% US$ ~3.0 billion* 27% 50% Infrastructure Business Management *The Business portion is included in segment Capex. 2026 AWARD Eye on Innovation – Oil & Gas 1st place (GIRO) and 3rd place (Petronemo) among 54 global innovations [Gartner] 2026 AWARD Best ICT in Brazil Recognized leadership [Forbes] HPC: we reached 300 Petaflops of capacity Capacity expansion, enabling 4D seismic and the development of AI domain models for the energy sector Smart routine and asset management Digital operating routine in refining and AI that anticipates failures Integrated procurement and materials planning Avoids early purchases and idle inventory 179 Technology as a competitive advantage Strategic drivers guiding the allocation of corporate resources Business competitiveness Information technology is the foundation of competitiveness and sustainability Strategic alignment PROCESS OPTIMIZATION Efficiency New reserve additions Governance Cash preservation + VALUE CREATED Safety Agility Reliability and capacity increase Decarbonization and sustainability Strategic use of data and AI AI used strategically enhances efficiency and results Acceleration of distributed digital innovation at Petrobras Governance and responsible use of AI Leadership in artificial intelligence applied to the energy sector Scale and integration Robust initiatives for integration, scale and reliability Investments in the modernization of infrastructure and expansion of digital sovereignty Anticipation of threats Development of people and digital skills 180 Integrating technologies, processes and people AGILIZA PROJECT: Delivering value through increased productivity, process redesign, adoption of new technologies and responsible use of AI Promote greater process efficiency through end-to-end optimization and automation, increasing productivity Process Intelligence Data & AI AGILIZA Provide quality data for assisted decision-making and promote the ethical, safe and responsible use of AI Operational Agility Simplify, experiment with and scale Lean practices in daily activities, fostering innovation and continuous value delivery Digital Fluency Develop a workforce with digital skills, providing fluency, analytical thinking and adaptability 181 Our talent is our main asset, a competitive advantage that drives us into the future The new Digital Fluency competency supports organizational transformation and cultural change Our value proposition places Petrobras among the best companies to work for in Brazil Highest-ranked Brazilian company and 2nd among industry Majors Forbes, 2026 91% for “Pride in working at Petrobras” in the employee survey 2025 Workplace Climate Survey Managing knowledge and critical competencies is an essential part of the company's talent strategy ONBOARDING TRAINING AND CONTINUING EDUCATION Developing talent for business challenges RESKILLING AND UPSKILLING New competencies and critical knowledge NEW KNOWLEDGE FRONTIERS Ensuring competitiveness and sustainability LEADERSHIP DEVELOPMENT Readiness to operate in complex environments DIGITAL FLUENCY Ethical and safe application of digital solutions for process efficiency Attractiveness Belonging and Continuous development Talent connected to the future of energy 182 Aligned incentives turn strategy into results We simplified and enhanced the measurement of long-term value creation and short-term profitability TOP TARGETS FCF1 GHGPI3 SCPI5 NPV2 ECPI4 SPECIFIC TARGETS connected to achieving the strategic objectives related to each segment TARGET WEIGHTS Executive Board General and basic structure managers Other employees 1FCF: Free Cash Flow: (actual FCF vs. FCF plan). ² NPV: Net Present Value: (current BP NPV vs. new BP NPV). ³ GHGPI: Greenhouse Gas EmissionsTarget Achievement Index. 4ECPI: Environmental Commitment Performance Indicator. 5 SCPI: Safety Commitment Performance Indicator. It does not impact variable compensation to avoid encouraging underreporting. VARIABLE COMPENSATION From General Manager to CEO, part of the variable compensation is deferred over 4 years, according to stock performance (stock performance) Remaining employees receive the full variable compensation in the year following the measured performance 183
























































































































































































SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
Date: November 23, 2026
PETRÓLEO BRASILEIRO S.A–PETROBRAS
By: /s/ Fernando Sabbi Melgarejo
______________________________
Fernando Sabbi Melgarejo
Chief Financial Officer and Investor Relations Officer