Riot Platforms (RIOT) posts big H1 2026 loss while locking in $9.1B AI data lease

(Moderate)
(Neutral)
Form Type
10-Q

Rhea-AI Filing Summary

Riot Platforms, Inc. reported higher revenue but significantly weaker profitability for the quarter and six months ended June 30, 2026, while accelerating its transition toward large-scale data center leasing.

Total revenue for the quarter was $174.2 million, up from $153.0 million a year earlier, driven by new Data Center revenue of $23.2 million and Engineering growth, partly offset by lower Bitcoin Mining revenue. For the first half of 2026, revenue was $341.5 million.

Despite this, the company recorded a quarterly net loss of $237.2 million versus net income of $219.5 million in 2025, and a six‑month net loss of $737.6 million versus a $76.9 million loss a year earlier, largely due to a $401.3 million negative change in the fair value of bitcoin, higher depreciation, and a $28.0 million impairment on equipment reoriented from bitcoin mining to data center use.

Riot sold 9,665 bitcoin for proceeds of $732.5 million, reducing holdings to 11,380 bitcoin (carrying amount $666.0 million). Cash, cash equivalents, and restricted cash increased to $548.9 million. The company entered a long-term AMD data center lease and, subsequent to quarter-end, a 20‑year 191 MW AI data center lease expected to generate about $9.1 billion in base rent, supported by a non‑recourse $573.0 million project credit facility.

Positive

  • New Data Center segment generated $56.4 million in revenue in the first half of 2026, establishing a recurring, non-mining income stream alongside Bitcoin Mining.
  • The August 2026 AI Tenant Lease for 191 MW of critical IT load at Rockdale is expected to produce about $9.1 billion in base rent over a 20‑year term, providing substantial contracted future cash flows.
  • Cash, cash equivalents, and restricted cash rose to $548.9 million at June 30, 2026, supported by $732.5 million of bitcoin sale proceeds, bolstering liquidity for data center build‑outs.
  • Long-term AMD Lease and amendment cover up to 200 MW of potential critical IT load capacity at Rockdale, diversifying revenue with multi‑year lease commitments.

Negative

  • Net loss for the first half of 2026 widened to $737.6 million from $76.9 million a year earlier, driven mainly by a $401.3 million negative bitcoin fair value adjustment and higher non‑cash expenses.
  • Bitcoin holdings declined from 19,273 to 11,380 bitcoin during the first half, with realized losses on sales and exchanges totaling $113.2 million, reducing direct exposure to future bitcoin upside.
  • Operating activities used $272.8 million of cash in the first half of 2026, indicating the underlying operations (including non‑cash bitcoin revaluation effects) did not fund the growth strategy.
  • Total stockholders’ equity decreased from $2.86 billion to $2.19 billion over six months, reflecting cumulative losses and fair value impacts on bitcoin holdings.
Q2 2026 Revenue $174.235 million Three months ended June 30, 2026 total revenue
H1 2026 Net Income (Loss) $(737.647 million) Six months ended June 30, 2026 net loss
H1 2026 Data Center Revenue $56.363 million Six months ended June 30, 2026 Data Center segment revenue
Bitcoin Holdings 11,380 bitcoin; $666.038 million Quantity and fair value as of June 30, 2026
Operating Cash Flow H1 2026 $(272.787 million) Net cash used in operating activities for six months ended June 30, 2026
Cash and Restricted Cash $548.868 million Cash, cash equivalents, and restricted cash as of June 30, 2026
AI Tenant Lease Base Rent $9.1 billion Expected base rent over initial 20-year term of August 2026 Tenant Lease
AMD Lease Future Base Rent $632.971 million Total undiscounted minimum operating lease payments to be received from AMD as of June 30, 2026
critical IT load capacity technical
"deployment of 50 MW of critical IT load capacity, with the potential for additional expansion"
exahash per second technical
"acquire U.S.-manufactured miners with a total hash rate of 50.9 exahash per second"
Exahash per second (EH/s) is a measure of computing power used in cryptocurrency mining equal to one quintillion (10^18) hashing operations every second; think of it like the number of lottery tickets being checked each second. For investors, a higher exahash rate signals a stronger, more secure network and greater competition among miners, which can influence mining profitability, network transaction costs, and the energy intensity tied to the asset.
Four Coincident Peak program technical
"participation in Electric Reliability Council of Texas, Inc.’s (“ERCOT”) Four Coincident Peak program"
Secured Overnight Financing Rate financial
"facility matures on October 15, 2026, and bears interest at SOFR plus 2.75%"
A secured overnight financing rate (SOFR) is a daily benchmark interest rate that reflects the cost of borrowing cash overnight using U.S. Treasury securities as collateral. Think of it as the market price to “rent” cash for a day with a very safe pledge, similar to paying a short-term rental fee for money backed by government bonds. Investors track SOFR because it underpins pricing for loans, bonds and derivatives, so movements change borrowing costs, interest income and the valuation of interest-rate–linked positions.
performance-based stock awards financial
"Performance-based stock awards and units were eligible to vest over a three-year performance period"
Level 3 on the fair value hierarchy financial
"valuation of the derivatives classified under Level 3 on the fair value hierarchy"
Revenue $341.454 million compared with $314.375 million for the six months ended June 30, 2025
Net Income (Loss) $(737.647 million) compared with $(76.913 million) for the six months ended June 30, 2025
Bitcoin Mining Revenue $225.631 million compared with $283.748 million for the six months ended June 30, 2025
Data Center Revenue $56.363 million compared with $0 for the six months ended June 30, 2025

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google
Learn about SEC filing dates

FAQ

How did RIOT Platforms, Inc. (RIOT) perform financially in Q2 2026?

Riot reported $174.2 million in Q2 2026 revenue and a net loss of $237.2 million. Revenue grew versus 2025, but a large negative $74.6 million bitcoin fair value change and higher depreciation turned prior-year profit into a substantial loss.

What were RIOT’s results for the first half of 2026?

For the six months ended June 30, 2026, Riot generated $341.5 million in revenue and a net loss of $737.6 million. Results were heavily affected by a $401.3 million negative change in bitcoin fair value and increased depreciation and impairment charges.

How much bitcoin does RIOT hold as of June 30, 2026?

Riot held 11,380 bitcoin with a carrying amount of $666.0 million as of June 30, 2026. This includes 5,559 bitcoin classified as Bitcoin and 5,821 bitcoin as Restricted bitcoin, with sales and compensation exchanges reducing the total from 18,005 at year‑start.

What new data center agreements has RIOT entered into?

Riot signed a long-term AMD data center lease for up to 200 MW and, in August 2026, a 20‑year Tenant Lease for 191 MW of AI data center capacity. The Tenant Lease is expected to generate about $9.1 billion in base rent over its initial term.

How is RIOT financing its AI data center expansion?

A Riot subsidiary entered a $573.0 million interim credit facility in August 2026 to fund long‑lead equipment and development for the Tenant Lease. The facility bears interest at SOFR plus 2.75%, is secured by project assets, and is non‑recourse to Riot Platforms, Inc.

What is the status of RIOT’s convertible notes due 2030?

Riot has $594.4 million principal outstanding on its 0.75% Convertible Senior Notes due 2030, recorded at $583.7 million net of costs. The notes are currently convertible in Q3 2026, and their estimated fair value was about $1.2 billion as of June 30, 2026.

How much cash and liquidity does RIOT have?

As of June 30, 2026, Riot had $471.4 million in cash and cash equivalents and $77.5 million in restricted cash, totaling $548.9 million. Liquidity was enhanced by significant bitcoin sales and access to multiple revolving and project credit facilities.
0001167419--12-312026Q20000000000P1YP2Y0.33330false0001167419srt:MaximumMemberus-gaap:RestrictedStockMemberus-gaap:SubsequentEventMember2026-07-012026-07-310001167419us-gaap:RestrictedStockUnitsRSUMemberriot:EquityIncentivePlan2019Member2026-01-012026-06-300001167419riot:AtMarketOffering2025Member2026-01-012026-06-300001167419us-gaap:RetainedEarningsMember2026-06-300001167419us-gaap:RetainedEarningsMember2026-03-3100011674192026-03-310001167419us-gaap:RetainedEarningsMember2025-12-310001167419us-gaap:RetainedEarningsMember2025-06-300001167419us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-06-300001167419us-gaap:RetainedEarningsMember2025-03-310001167419us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-03-3100011674192025-03-310001167419us-gaap:RetainedEarningsMember2024-12-310001167419us-gaap:AccumulatedOtherComprehensiveIncomeMember2024-12-310001167419us-gaap:RestrictedStockMember2026-01-012026-06-300001167419us-gaap:CommonStockMember2026-06-300001167419us-gaap:CommonStockMember2026-03-310001167419us-gaap:CommonStockMember2025-12-310001167419us-gaap:CommonStockMember2025-06-300001167419us-gaap:CommonStockMember2025-03-310001167419us-gaap:CommonStockMember2024-12-310001167419us-gaap:EmployeeStockOptionMember2026-06-300001167419us-gaap:EmployeeStockOptionMember2025-12-310001167419riot:PerformanceBasedRSUsMember2026-06-300001167419riot:PerformanceBasedRsasMember2026-06-300001167419riot:ServicebasedRSUsMember2025-12-310001167419riot:ServicebasedRSAsMember2025-12-310001167419riot:PerformanceBasedRSUsMember2025-12-310001167419riot:PerformanceBasedRsasMember2025-12-310001167419riot:PerformanceBasedRSUsMember2026-01-012026-06-300001167419riot:PerformanceBasedRsasMember2026-01-012026-06-300001167419srt:MinimumMemberriot:ServiceBasedAwardsMember2026-01-012026-06-300001167419srt:MaximumMemberriot:ServiceBasedAwardsMember2026-01-012026-06-300001167419us-gaap:RestrictedStockMemberriot:EquityIncentivePlan2019Member2026-01-012026-06-300001167419us-gaap:EmployeeStockOptionMember2025-06-012025-06-300001167419us-gaap:OperatingSegmentsMemberus-gaap:ReportableSegmentAggregationBeforeOtherOperatingSegmentMember2026-04-012026-06-300001167419us-gaap:IntersegmentEliminationMemberus-gaap:ReportableSegmentAggregationBeforeOtherOperatingSegmentMember2026-04-012026-06-300001167419us-gaap:IntersegmentEliminationMemberriot:EngineeringSegmentMember2026-04-012026-06-300001167419us-gaap:ReportableSegmentAggregationBeforeOtherOperatingSegmentMember2026-04-012026-06-300001167419riot:EngineeringSegmentMember2026-04-012026-06-300001167419riot:DataCentersSegmentMember2026-04-012026-06-300001167419riot:BitcoinMiningSegmentMember2026-04-012026-06-300001167419us-gaap:OperatingSegmentsMemberus-gaap:ReportableSegmentAggregationBeforeOtherOperatingSegmentMember2026-01-012026-06-300001167419us-gaap:IntersegmentEliminationMemberus-gaap:ReportableSegmentAggregationBeforeOtherOperatingSegmentMember2026-01-012026-06-300001167419us-gaap:IntersegmentEliminationMemberriot:EngineeringSegmentMember2026-01-012026-06-300001167419us-gaap:ReportableSegmentAggregationBeforeOtherOperatingSegmentMember2026-01-012026-06-300001167419riot:EngineeringSegmentMember2026-01-012026-06-300001167419riot:DataCentersSegmentMember2026-01-012026-06-300001167419riot:BitcoinMiningSegmentMember2026-01-012026-06-300001167419us-gaap:OperatingSegmentsMemberus-gaap:ReportableSegmentAggregationBeforeOtherOperatingSegmentMember2025-04-012025-06-300001167419us-gaap:IntersegmentEliminationMemberus-gaap:ReportableSegmentAggregationBeforeOtherOperatingSegmentMember2025-04-012025-06-300001167419us-gaap:IntersegmentEliminationMemberriot:EngineeringSegmentMember2025-04-012025-06-300001167419us-gaap:ReportableSegmentAggregationBeforeOtherOperatingSegmentMember2025-04-012025-06-300001167419riot:EngineeringSegmentMember2025-04-012025-06-300001167419riot:BitcoinMiningSegmentMember2025-04-012025-06-300001167419us-gaap:OperatingSegmentsMemberus-gaap:ReportableSegmentAggregationBeforeOtherOperatingSegmentMember2025-01-012025-06-300001167419us-gaap:IntersegmentEliminationMemberus-gaap:ReportableSegmentAggregationBeforeOtherOperatingSegmentMember2025-01-012025-06-300001167419us-gaap:IntersegmentEliminationMemberriot:EngineeringSegmentMember2025-01-012025-06-300001167419us-gaap:ReportableSegmentAggregationBeforeOtherOperatingSegmentMember2025-01-012025-06-300001167419riot:EngineeringSegmentMember2025-01-012025-06-300001167419riot:BitcoinMiningSegmentMember2025-01-012025-06-300001167419us-gaap:RestrictedStockMemberus-gaap:SubsequentEventMember2026-07-012026-07-310001167419riot:CorsicanaFacilityMember2026-06-300001167419us-gaap:OfficeEquipmentMember2026-06-300001167419us-gaap:LandBuildingsAndImprovementsMember2026-06-300001167419us-gaap:ConstructionInProgressMember2026-06-300001167419us-gaap:BuildingAndBuildingImprovementsMember2026-06-300001167419riot:MinersAndMiningEquipmentMember2026-06-300001167419riot:MachineryAndFacilityEquipmentMember2026-06-300001167419us-gaap:OfficeEquipmentMember2025-12-310001167419us-gaap:LandBuildingsAndImprovementsMember2025-12-310001167419us-gaap:ConstructionInProgressMember2025-12-310001167419us-gaap:BuildingAndBuildingImprovementsMember2025-12-310001167419riot:MinersAndMiningEquipmentMember2025-12-310001167419riot:MachineryAndFacilityEquipmentMember2025-12-310001167419us-gaap:RevolvingCreditFacilityMember2025-01-012025-06-300001167419riot:ConvertiblePreferredStockSeriesBMember2026-06-300001167419riot:ConvertiblePreferredStockSeriesAMember2026-06-300001167419riot:ConvertiblePreferredStockSeriesBMember2025-12-310001167419riot:ConvertiblePreferredStockSeriesAMember2025-12-310001167419riot:SbiCryptoCoLitigationMember2026-02-162026-02-160001167419us-gaap:NotesPayableToBanksMember2026-06-300001167419us-gaap:RetainedEarningsMember2026-04-012026-06-300001167419us-gaap:RetainedEarningsMember2026-01-012026-06-300001167419us-gaap:RetainedEarningsMember2025-04-012025-06-300001167419us-gaap:RetainedEarningsMember2025-01-012025-06-300001167419riot:GreenRevolutionCoolingPatentDisputeMembersrt:MaximumMember2024-12-310001167419riot:SbiCryptoCoLitigationMembersrt:MinimumMemberriot:ProfitLossMember2024-11-250001167419riot:SbiCryptoCoLitigationMembersrt:MinimumMemberriot:EquipmentDamageMember2024-11-250001167419riot:GMOLitigationMember2022-06-130001167419riot:SbiCryptoCoLitigationMembersrt:MinimumMember2024-11-252024-11-250001167419riot:GMOLitigationMember2023-10-192023-10-190001167419riot:GMOLitigationMember2022-06-132022-06-130001167419riot:FiveHundredSeventyThreeMillionCreditFacilityMemberus-gaap:SubsequentEventMember2026-08-310001167419riot:TwoHundredMillionCreditFacilityMember2025-05-200001167419riot:TwoHundredMillionCreditFacilityMember2025-04-220001167419riot:FiveHundredSeventyThreeMillionCreditFacilityMemberus-gaap:SubsequentEventMember2026-08-012026-08-310001167419us-gaap:SubsequentEventMemberriot:LeaseAgreementWithAnthropicPbcMember2026-08-310001167419riot:TwoHundredMillionCreditFacilityMember2026-04-012026-06-300001167419riot:TwentyMillionCreditFacilityMember2026-04-012026-06-300001167419riot:FiftyMillionCreditFacilityMember2026-04-012026-06-300001167419riot:TwoHundredMillionCreditFacilityMember2026-01-012026-06-300001167419riot:TwentyMillionCreditFacilityMember2025-04-012025-06-300001167419riot:FiftyMillionCreditFacilityMember2025-04-012025-06-300001167419riot:TwentyMillionCreditFacilityMember2025-01-012025-06-300001167419riot:FiftyMillionCreditFacilityMember2025-01-012025-06-300001167419riot:TwoHundredMillionCreditFacilityMember2025-04-012025-06-300001167419us-gaap:RestrictedStockUnitsRSUMember2025-04-012025-06-300001167419us-gaap:RestrictedStockMember2025-04-012025-06-300001167419us-gaap:ConvertibleDebtSecuritiesMember2025-04-012025-06-300001167419us-gaap:IntersegmentEliminationMember2026-04-012026-06-300001167419us-gaap:IntersegmentEliminationMember2026-01-012026-06-300001167419us-gaap:IntersegmentEliminationMember2025-04-012025-06-300001167419us-gaap:CorporateNonSegmentMember2025-04-012025-06-300001167419us-gaap:OperatingSegmentsMemberriot:DataCentersSegmentMember2025-01-012025-06-300001167419us-gaap:IntersegmentEliminationMember2025-01-012025-06-300001167419us-gaap:CorporateNonSegmentMember2025-01-012025-06-300001167419riot:E4aSolutionsMemberriot:EngineeringSegmentMember2026-06-300001167419riot:BlockMiningIncMemberriot:BitcoinMiningSegmentMember2026-06-300001167419us-gaap:FutureMember2026-04-012026-06-300001167419us-gaap:FutureMember2026-01-012026-06-300001167419us-gaap:FutureMember2025-04-012025-06-300001167419us-gaap:FutureMember2025-01-012025-06-300001167419us-gaap:TrademarksMember2026-06-300001167419us-gaap:PatentsMember2026-06-300001167419us-gaap:CustomerContractsMember2026-06-300001167419riot:UlListingsMember2026-06-300001167419us-gaap:TrademarksMember2025-12-310001167419us-gaap:PatentsMember2025-12-310001167419us-gaap:CustomerContractsMember2025-12-310001167419riot:UlListingsMember2025-12-3100011674192025-01-012025-12-310001167419riot:PerformancebasedRSUsMember2026-01-012026-06-300001167419riot:PerformancebasedRSAsMember2026-01-012026-06-300001167419riot:ServicebasedRSUsMember2026-06-300001167419riot:ServicebasedRSAsMember2026-06-300001167419riot:PerformancebasedRSUsMember2026-06-300001167419riot:PerformancebasedRSAsMember2026-06-300001167419riot:RockdalePowerPurchaseAgreementMember2026-06-300001167419riot:CorsicanaPowerPurchaseAgreementMember2026-06-300001167419riot:RockdalePowerPurchaseAgreementMember2025-12-310001167419riot:CorsicanaPowerPurchaseAgreementMember2025-12-310001167419riot:RockdalePowerPurchaseAgreementMember2025-06-300001167419riot:CorsicanaPowerPurchaseAgreementMember2025-06-300001167419riot:RockdalePowerPurchaseAgreementMember2024-12-310001167419riot:CorsicanaPowerPurchaseAgreementMember2024-12-310001167419srt:WeightedAverageMemberus-gaap:MeasurementInputCommodityForwardPriceMember2026-06-300001167419srt:MinimumMemberus-gaap:MeasurementInputCommodityForwardPriceMember2026-06-300001167419srt:MaximumMemberus-gaap:MeasurementInputCommodityForwardPriceMember2026-06-300001167419us-gaap:MeasurementInputDiscountRateMember2026-06-300001167419srt:WeightedAverageMemberus-gaap:MeasurementInputCommodityForwardPriceMember2025-12-310001167419srt:MinimumMemberus-gaap:MeasurementInputCommodityForwardPriceMember2025-12-310001167419srt:MaximumMemberus-gaap:MeasurementInputCommodityForwardPriceMember2025-12-310001167419riot:TwentyMillionCreditFacilityMember2026-06-300001167419riot:FiftyMillionCreditFacilityMember2026-06-300001167419us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-04-012025-06-300001167419us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-01-012025-06-300001167419riot:TwoHundredMillionCreditFacilityMember2026-04-212026-04-210001167419us-gaap:LetterOfCreditMember2024-08-012024-08-310001167419srt:MinimumMemberus-gaap:ConvertibleNotesPayableMember2026-06-300001167419srt:MaximumMemberus-gaap:ConvertibleNotesPayableMember2026-06-300001167419riot:BlockMiningIncMemberus-gaap:NotesPayableToBanksMember2026-06-300001167419riot:TwoHundredMillionCreditFacilityMember2025-01-012025-06-300001167419srt:MinimumMemberus-gaap:ConvertibleNotesPayableMember2026-01-012026-06-300001167419us-gaap:ConvertibleNotesPayableMember2026-06-300001167419riot:MiningMember2026-04-012026-06-300001167419riot:EngineeringMember2026-04-012026-06-300001167419riot:DataCentersOperationsMember2026-04-012026-06-300001167419riot:MiningMember2026-01-012026-06-300001167419riot:EngineeringMember2026-01-012026-06-300001167419riot:DataCentersOperationsMember2026-01-012026-06-300001167419riot:OtherRevenueMember2025-04-012025-06-300001167419riot:MiningMember2025-04-012025-06-300001167419riot:EngineeringMember2025-04-012025-06-300001167419riot:OtherRevenueMember2025-01-012025-06-300001167419riot:MiningMember2025-01-012025-06-300001167419riot:EngineeringMember2025-01-012025-06-300001167419us-gaap:OperatingSegmentsMemberriot:EngineeringSegmentMember2026-04-012026-06-300001167419us-gaap:OperatingSegmentsMemberriot:EngineeringSegmentMember2026-01-012026-06-300001167419us-gaap:OperatingSegmentsMemberriot:EngineeringSegmentMember2025-04-012025-06-300001167419us-gaap:OperatingSegmentsMemberriot:EngineeringSegmentMember2025-01-012025-06-300001167419riot:EngineeringMember2025-12-310001167419riot:E4aSolutionsMember2026-06-300001167419riot:BlockMiningIncMember2026-06-300001167419riot:E4aSolutionsMember2025-12-310001167419riot:BlockMiningIncMember2025-12-310001167419riot:E4aSolutionsMember2024-12-310001167419riot:EquityIncentivePlan2019Member2026-06-3000011674192024-12-310001167419srt:MinimumMemberriot:E4aSolutionsMemberus-gaap:MeasurementInputRiskFreeInterestRateMember2026-06-300001167419srt:MaximumMemberriot:E4aSolutionsMemberus-gaap:MeasurementInputRiskFreeInterestRateMember2026-06-300001167419riot:E4aSolutionsMemberus-gaap:MeasurementInputCreditSpreadMember2026-06-300001167419riot:BlockMiningIncMemberus-gaap:MeasurementInputRiskFreeInterestRateMember2026-06-300001167419riot:BlockMiningIncMemberus-gaap:MeasurementInputCreditSpreadMember2026-06-300001167419riot:BlockMiningIncMember2024-07-230001167419riot:E4aSolutionsMember2026-04-012026-06-300001167419riot:BlockMiningIncMember2026-04-012026-06-300001167419riot:E4aSolutionsMember2026-01-012026-06-300001167419riot:BlockMiningIncMember2026-01-012026-06-300001167419us-gaap:FairValueInputsLevel3Member2026-06-300001167419us-gaap:FairValueInputsLevel3Member2025-12-310001167419us-gaap:RestrictedStockUnitsRSUMember2026-04-012026-06-300001167419us-gaap:RestrictedStockMember2026-04-012026-06-300001167419us-gaap:ConvertibleDebtSecuritiesMember2026-04-012026-06-300001167419riot:WarrantsToPurchaseCommonStockMember2026-04-012026-06-300001167419us-gaap:RestrictedStockUnitsRSUMember2026-01-012026-06-300001167419us-gaap:RestrictedStockMember2026-01-012026-06-300001167419us-gaap:ConvertibleDebtSecuritiesMember2026-01-012026-06-300001167419riot:WarrantsToPurchaseCommonStockMember2026-01-012026-06-300001167419us-gaap:EmployeeStockOptionMember2025-04-012025-06-300001167419riot:WarrantsToPurchaseCommonStockMember2025-04-012025-06-300001167419us-gaap:RestrictedStockUnitsRSUMember2025-01-012025-06-300001167419us-gaap:RestrictedStockMember2025-01-012025-06-300001167419us-gaap:EmployeeStockOptionMember2025-01-012025-06-300001167419riot:WarrantsToPurchaseCommonStockMember2025-01-012025-06-300001167419us-gaap:ConvertibleNotesPayableMember2026-04-012026-06-300001167419us-gaap:ConvertibleNotesPayableMember2026-01-012026-06-300001167419us-gaap:ConvertibleNotesPayableMember2025-04-012025-06-300001167419us-gaap:ConvertibleNotesPayableMember2025-01-012025-06-300001167419us-gaap:PerformanceSharesMember2026-04-012026-06-300001167419us-gaap:EmployeeStockOptionMember2026-04-012026-06-300001167419riot:ServiceBasedAwardsMember2026-04-012026-06-300001167419us-gaap:PerformanceSharesMember2026-01-012026-06-300001167419us-gaap:EmployeeStockOptionMember2026-01-012026-06-300001167419riot:ServiceBasedAwardsMember2026-01-012026-06-300001167419us-gaap:PerformanceSharesMember2025-04-012025-06-300001167419us-gaap:EmployeeStockOptionMember2025-04-012025-06-300001167419riot:ServiceBasedAwardsMember2025-04-012025-06-300001167419us-gaap:PerformanceSharesMember2025-01-012025-06-300001167419us-gaap:EmployeeStockOptionMember2025-01-012025-06-300001167419riot:ServiceBasedAwardsMember2025-01-012025-06-300001167419us-gaap:RestrictedStockMemberriot:MemberOfOurCompanysOfficersAndEmployeesMember2026-01-012026-06-300001167419riot:PowerSupplyAgreementWithTxuMember2023-12-310001167419riot:EngineeringMember2026-06-300001167419riot:DataCenterMember2026-06-300001167419riot:GreenRevolutionCoolingPatentDisputeMember2024-01-012024-12-310001167419riot:LeaseAgreementWithAmdRockdaleFacilityMember2026-01-310001167419riot:RockdaleFacilityBitcoinMiningFacilityTexasMember2026-06-300001167419riot:PowerSupplyAgreementWithTxuMember2026-01-012026-06-300001167419riot:CorsicanaFacilityMember2024-01-012024-12-310001167419riot:CorsicanaFacilityMember2026-06-300001167419us-gaap:FutureMember2026-06-300001167419riot:KentuckyFacilityMember2026-06-300001167419riot:PowerSupplyAgreementWithTxuMember2026-06-300001167419riot:TwoHundredMillionCreditFacilityMember2026-06-300001167419riot:ServicebasedRSUsMember2026-01-012026-06-300001167419riot:ServicebasedRSAsMember2026-01-012026-06-300001167419riot:RockdaleFacilityBitcoinMiningFacilityTexasMemberriot:TxuEnergyRetailCompanyLlcMemberriot:PowerPurchaseAgreementMember2022-11-012022-11-300001167419riot:RockdaleFacilityBitcoinMiningFacilityTexasMemberriot:TxuEnergyRetailCompanyLlcMemberriot:PowerPurchaseAgreementMember2022-03-012022-03-310001167419riot:AtMarketOffering2025Member2025-01-012025-12-310001167419riot:FiftyMillionCreditFacilityMember2026-01-012026-06-300001167419riot:TwentyMillionCreditFacilityMember2024-08-012024-08-310001167419riot:FiftyMillionCreditFacilityMember2024-07-012024-07-310001167419riot:TwentyMillionCreditFacilityMember2026-01-012026-06-300001167419riot:TwoHundredMillionCreditFacilityMember2026-04-210001167419riot:TwentyMillionCreditFacilityMember2024-08-310001167419riot:FiftyMillionCreditFacilityMember2024-07-310001167419riot:GroundLeaseMember2026-06-300001167419srt:ScenarioForecastMemberus-gaap:SubsequentEventMemberriot:LeaseAgreementWithAnthropicPbcMember2026-08-012026-08-310001167419riot:LeaseAgreementWithAmdRockdaleFacilityMember2026-01-012026-06-300001167419riot:CorsicanaFacilityMember2024-12-310001167419us-gaap:SubsequentEventMemberriot:LeaseAgreementWithAnthropicPbcMember2026-08-012026-08-310001167419riot:MicrobtElectronicsTechnologyCo.LtdMember2026-06-300001167419riot:MicrobtElectronicsTechnologyCo.LtdMember2026-01-012026-06-300001167419us-gaap:CommonStockMember2026-04-012026-06-300001167419us-gaap:CommonStockMember2026-01-012026-06-300001167419us-gaap:CommonStockMember2025-04-012025-06-300001167419us-gaap:CommonStockMember2025-01-012025-06-300001167419riot:MicrobtElectronicsTechnologyCo.LtdMember2023-01-012026-12-310001167419us-gaap:FairValueInputsLevel1Member2026-06-300001167419us-gaap:FairValueInputsLevel1Member2025-12-310001167419riot:LeaseAgreementWithAmdRockdaleFacilityMember2026-04-012026-04-300001167419riot:LeaseAgreementWithAmdRockdaleFacilityMember2026-01-012026-01-310001167419us-gaap:OperatingSegmentsMemberriot:DataCentersSegmentMember2026-04-012026-06-300001167419us-gaap:OperatingSegmentsMemberriot:BitcoinMiningSegmentMember2026-04-012026-06-300001167419us-gaap:OperatingSegmentsMember2026-04-012026-06-300001167419us-gaap:OperatingSegmentsMemberriot:DataCentersSegmentMember2026-01-012026-06-300001167419us-gaap:OperatingSegmentsMemberriot:BitcoinMiningSegmentMember2026-01-012026-06-300001167419us-gaap:OperatingSegmentsMember2026-01-012026-06-300001167419us-gaap:OperatingSegmentsMemberriot:BitcoinMiningSegmentMember2025-04-012025-06-300001167419us-gaap:OperatingSegmentsMember2025-04-012025-06-300001167419us-gaap:OperatingSegmentsMemberriot:BitcoinMiningSegmentMember2025-01-012025-06-300001167419us-gaap:OperatingSegmentsMember2025-01-012025-06-300001167419riot:AtMarketOffering2025Member2026-06-300001167419riot:RockdalePowerPurchaseAgreementMember2026-01-012026-06-300001167419riot:CorsicanaPowerPurchaseAgreementMember2026-01-012026-06-300001167419riot:RockdalePowerPurchaseAgreementMember2025-01-012025-06-300001167419riot:CorsicanaPowerPurchaseAgreementMember2025-01-012025-06-300001167419us-gaap:MaterialReconcilingItemsMember2026-04-012026-06-300001167419us-gaap:MaterialReconcilingItemsMember2026-01-012026-06-300001167419us-gaap:MaterialReconcilingItemsMember2025-04-012025-06-3000011674192025-04-012025-06-300001167419us-gaap:MaterialReconcilingItemsMember2025-01-012025-06-3000011674192024-12-1600011674192025-06-3000011674192025-01-012025-06-300001167419riot:CorsicanaFacilityMemberriot:PowerPurchaseAgreementMember2026-01-012026-06-300001167419riot:PowerPurchaseAgreementMember2026-01-012026-06-300001167419riot:RockdaleFacilityBitcoinMiningFacilityTexasMemberriot:TxuEnergyRetailCompanyLlcMemberriot:PowerPurchaseAgreementMember2020-05-012020-05-3100011674192026-06-3000011674192025-12-3100011674192026-04-012026-06-3000011674192026-08-070001167419dei:FormerAddressMember2026-01-012026-06-3000011674192026-01-012026-06-30iso4217:USDxbrli:sharesriot:Driot:segmentxbrli:sharesiso4217:USDutr:MWxbrli:pureutr:MWhriot:itemutr:GWhriot:Yiso4217:USDutr:MW

Table of Contents

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 10-Q

 QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the quarterly period ended June 30, 2026

OR

 TRANSITION REPORT UNDER SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from:         to:        

Commission file number: 001-33675

RIOT PLATFORMS, INC.

(Exact name of registrant as specified in its charter)

Nevada

  ​ ​ ​

84-1553387

(State or other jurisdiction of incorporation or organization)

(I.R.S. Employer Identification No.)

85 Rio Grande Drive, Suite 200, Castle Rock, CO

  ​ ​ ​

80104

(Address of principal executive offices)

(Zip Code)

Registrant’s telephone number, including area code (303) 794-2000

3855 Ambrosia Street, Suite 301

Castle Rock, CO 80109

(Former name, former address and former fiscal year, if changed since last report)

Securities registered pursuant to Section 12(b) of the Securities Exchange Act:

Securities registered under Section 12(b) of the Securities Exchange Act:

Common Stock, no par value per share

  ​ ​ ​

RIOT

  ​ ​ ​

The Nasdaq Capital Market

(Title of class)

(Trading Symbol)

(Name of each exchange on which registered)

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes      No 

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). Yes     No 

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See definition of “large accelerated filer,” “accelerated filer,” “smaller reporting company” and “emerging growth company” in Rule 12b-2 of the Exchange Act.

Large accelerated filer

  ​ ​

Accelerated filer

Non-accelerated filer

Smaller reporting company

Emerging growth company

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act.

Indicate by check mark whether registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes     No  

As of August 7, 2026, the registrant had 375,258,935 shares of its common stock, no par value per share, outstanding, which was the only class of its registered securities outstanding as of that date.

Table of Contents

RIOT PLATFORMS, INC.

Page

PART I - FINANCIAL INFORMATION

Item 1.

Financial Statements (Unaudited)

1

Condensed Consolidated Balance Sheets as of June 30, 2026 and December 31, 2025

1

Condensed Consolidated Statements of Operations for the three and six months ended June 30, 2026 and 2025

2

Condensed Consolidated Statements of Comprehensive Income (Loss) for the three and six months ended June 30, 2026 and 2025

3

Condensed Consolidated Statements of Stockholders’ Equity for the three and six months ended June 30, 2026 and 2025

4

Condensed Consolidated Statements of Cash Flows for the six months ended June 30, 2026 and 2025

5

Notes to Condensed Consolidated Financial Statements

7

Item 2.

Management’s Discussion and Analysis of Financial Condition and Results of Operations

35

Item 3.

Quantitative and Qualitative Disclosures About Market Risk

53

Item 4.

Controls and Procedures

54

PART II - OTHER INFORMATION

Item 1.

Legal Proceedings

54

Item 1A.

Risk Factors

54

Item 2.

Unregistered Sales of Equity Securities and Use of Proceeds

56

Item 5.

Other Information

56

Item 6.

Exhibits

57

Signatures

59

RIOT PLATFORMS, INC.

As used in this Quarterly Report on Form 10-Q for the quarterly period ended June 30, 2026 (this “Quarterly Report”), the terms “we,” “us,” “our,” the “Company,” the “Registrant,” “Riot Platforms,” and “Riot” mean Riot Platforms, Inc., a Nevada corporation, and its consolidated subsidiaries, unless otherwise indicated.

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS

This Quarterly Report contains forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 (the “PSLRA”). The Company may also make forward-looking statements in other reports and documents filed with the United States Securities and Exchange Commission (the “SEC”), including those that are incorporated by reference herein. All statements in this Quarterly Report and the documents incorporated by reference herein, other than statements of historical fact, are “forward-looking statements” within the scope of this cautionary note, including, but not limited to statements concerning: our plans, strategies, and objectives for future operations, including the Company’s strategic evolution from a bitcoin mining-focused enterprise to a diversified data center and digital infrastructure company; the integration of new equipment, systems, technologies, services, or developments; the development, construction, and commissioning of the Company’s power capacity for large-scale data center purposes, including artificial intelligence (“AI”) and high-performance computing (“HPC”) uses; the deployment of industrial-scale immersion-cooled bitcoin mining hardware at our Bitcoin Mining facilities in Texas and Kentucky; the anticipated demand for large-scale data centers and specialized compute infrastructure; forecasted delivery timelines for power, cooling, and networking infrastructure; future economic conditions, performance, or outlooks; future political and regulatory conditions; the outcome of contingencies; potential acquisitions or divestitures of digital infrastructure assets; the number and value of bitcoin rewards and transaction fees we earn from our Bitcoin Mining operations; future self-mining hash rate capacity; timing of receipt and deployment of miners; expected cash flows or capital expenditures related to data center build-outs; our beliefs or expectations; activities, events, or developments that we intend, expect, project, believe, or anticipate will or may occur in the future; and assumptions underlying or based on any of the foregoing. Forward-looking statements may be identified by their use of forward-looking terminology, such as “believes,” “expects,” “may,” “should,” “would,” “will,” “intends,” “plans,” “estimates,” “anticipates,” “projects,” and similar words or expressions; however, forward-looking statements may be made without such terminology.

i

Table of Contents

Such forward-looking statements reflect our management’s current opinions, expectations, beliefs, and assumptions regarding future events based on information available as of the date made. These statements are subject to risks and uncertainties, both identified and unidentified by management, which may prevent anticipated results from materializing or prove to be inaccurate. Such risk factors are described in greater detail under the heading “Risk Factors” in Part II, Item 1A of this Quarterly Report and in Part I, Item 1A of our Annual Report on Form 10-K for the year ended December 31, 2025 (“2025 Annual Report”), and under similar headings in subsequent filings we may make with the SEC. Management cannot predict all risks, their potential impact on our business, or the extent to which any factor, or combination of factors may cause our actual results to differ from any forward-looking statements we may make. You should not place undue reliance on these forward-looking statements, which represent management’s views only as of the date the statements are made and do not guarantee future performance or results. Should any risks or uncertainties develop into actual events, these developments could have a material adverse effect on our business, financial condition, results of operations, stockholders’ equity, cash flows, and the market price of our securities.

Accordingly, you should read this Quarterly Report and the other filings we make with the SEC, in their entirety, recognizing that our future results may differ materially from our historical results and from the results expressed in or implied by forward-looking statements. The forward-looking statements contained in this Quarterly Report and other reports and the documents incorporated by reference herein speak only as of the date they are made and, unless otherwise required by applicable securities laws, we disclaim any intention or obligation to update or revise any such forward-looking statements, whether as a result of new information, future events or otherwise. All forward-looking statements are expressly qualified by these cautionary statements and are made in reliance on the safe harbor provisions of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), and the PSLRA.

As used throughout this Quarterly Report, the term “Bitcoin” with a capital “B” is used to denote the Bitcoin protocol, which implements a highly available, public, permanent, and decentralized ledger. The term “bitcoin” with a lower case “b” is used to denote the coin, bitcoin.

ii

Table of Contents

PART I - FINANCIAL INFORMATION

Item 1. Financial Statements

Riot Platforms, Inc.

Condensed Consolidated Balance Sheets

(Unaudited; in thousands, except for share amounts)

June 30, 2026

December 31, 2025

ASSETS

  ​ ​ ​

  ​

  ​ ​ ​

  ​

Current assets

 

  ​

 

  ​

Cash and cash equivalents

$

471,383

$

233,517

Restricted cash

77,485

76,272

Accounts receivable, net

 

42,438

 

29,788

Contract assets

 

19,947

 

8,308

Prepaid expenses and other current assets

 

96,209

 

59,447

Derivative assets, current portion

18,268

41,378

Total current assets

 

725,730

 

448,710

Property and equipment, net

 

1,554,413

 

1,528,716

Bitcoin

325,370

1,227,462

Restricted bitcoin

340,668

347,979

Deposits

 

31,556

 

76,511

Finite-lived intangible assets, net

 

28,305

 

30,187

Derivative assets, less current portion

70,197

106,670

Right-of-use assets

38,704

30,171

Goodwill

122,499

122,499

Other long-term assets

 

26,122

 

17,862

Total assets

$

3,263,564

$

3,936,767

 

  ​

 

  ​

LIABILITIES AND STOCKHOLDERS’ EQUITY

 

  ​

 

  ​

Current liabilities

 

  ​

 

  ​

Accounts payable

$

18,126

$

23,420

Contract liabilities

 

65,643

 

37,117

Accrued expenses and other current liabilities

101,024

142,852

Contingent consideration liabilities, current portion

 

8,195

 

6,185

Current portion of debt

254,615

253,887

Operating lease liability, current portion

 

10,143

 

6,314

Total current liabilities

 

457,746

 

469,775

 

  ​

 

  ​

Operating lease liability, less current portion

 

24,625

 

19,648

Contingent consideration liabilities, less current portion

 

 

2,010

Debt, less current portion

588,412

586,909

Other long-term liabilities

 

165

 

19

Total liabilities

 

1,070,948

 

1,078,361

 

  ​

 

  ​

Commitments and contingencies - Note 16

 

  ​

 

  ​

 

  ​

 

  ​

Stockholders’ equity

 

  ​

 

  ​

Preferred stock, no par value, 15,000,000 shares authorized:

 

  ​

 

  ​

2% Series A Convertible Preferred stock, 2,000,000 shares authorized; no shares issued and outstanding as of June 30, 2026 and December 31, 2025

 

 

0% Series B Convertible Preferred stock, 1,750,001 shares authorized; no shares issued and outstanding as of June 30, 2026 and December 31, 2025

 

 

Common stock, no par value; 680,000,000 shares authorized; 378,022,964 and 371,575,652 shares issued and outstanding as of June 30, 2026 and December 31, 2025, respectively

 

4,283,863

 

4,212,006

Accumulated deficit

 

(2,091,247)

 

(1,353,600)

Total stockholders’ equity

 

2,192,616

 

2,858,406

Total liabilities and stockholders’ equity

$

3,263,564

$

3,936,767

See accompanying Notes to Condensed Consolidated Financial Statements.

1

Table of Contents

Riot Platforms, Inc.

Condensed Consolidated Statements of Operations

(Unaudited; in thousands, except for share and per share amounts)

Three Months Ended

Six Months Ended

June 30, 

June 30, 

  ​ ​ ​

2026

  ​ ​ ​

2025

  ​ ​ ​

2026

  ​ ​ ​

2025

Revenue:

  ​

  ​

  ​

  ​

Bitcoin Mining

$

113,736

$

140,889

$

225,631

$

283,748

Data Center

23,213

56,363

Engineering

 

37,286

 

10,576

 

59,460

 

24,496

Other

 

 

1,523

 

 

6,131

Total revenue

 

174,235

 

152,988

 

341,454

 

314,375

 

  ​

 

  ​

 

  ​

 

  ​

Costs and expenses:

 

 

 

  ​

Cost of revenue (excludes depreciation and amortization presented below):

Bitcoin Mining

 

89,264

 

78,175

 

176,026

 

152,993

Data Center

16,700

47,473

Engineering

 

27,030

 

9,858

 

45,171

 

21,664

Other

 

 

3,006

 

 

11,971

Acquisition-related costs

 

 

111

 

 

187

Selling, general, and administrative

 

81,999

 

75,902

 

158,179

 

147,350

Depreciation and amortization

 

97,784

 

83,197

 

195,518

 

161,123

Change in fair value of bitcoin

74,607

(470,812)

401,276

(262,772)

Change in fair value of derivatives

 

8,362

 

42,747

 

60,214

 

853

Power curtailment credits

(10,054)

(8,313)

(31,077)

(16,114)

Change in fair value of contingent consideration

 

 

(9,390)

 

 

(17,642)

Loss on contract settlement

158,137

158,137

Gain on acquisition post-close dispute settlement

(26,007)

(26,007)

Loss on sale/exchange of equipment

350

479

Casualty-related charges (recoveries), net

3

(119)

3

(119)

Impairment of property and equipment

27,972

27,972

Total costs and expenses

 

413,667

 

(63,158)

 

1,080,755

 

332,103

Operating income (loss)

 

(239,432)

 

216,146

 

(739,301)

 

(17,728)

 

  ​

 

  ​

 

  ​

 

  ​

Other income (expense):

 

  ​

 

  ​

 

  ​

 

  ​

Interest income

3,623

3,334

5,936

6,731

Interest expense

(2,687)

(6,093)

(5,305)

(8,401)

Gain (loss) on equity method investment - marketable securities

6,143

(57,095)

Other income (expense)

1,221

244

1,209

337

Total other income (expense)

 

2,157

 

3,628

 

1,840

 

(58,428)

 

  ​

 

  ​

 

  ​

 

  ​

Net income (loss) before taxes

 

(237,275)

 

219,774

 

(737,461)

 

(76,156)

 

  ​

 

  ​

 

  ​

 

  ​

Current income tax benefit (expense)

 

105

 

(320)

 

(186)

 

(757)

 

  ​

 

  ​

 

  ​

 

  ​

Net income (loss)

$

(237,170)

$

219,454

$

(737,647)

$

(76,913)

Basic net income (loss) per share

$

(0.68)

$

0.65

$

(2.12)

$

(0.23)

Diluted net income (loss) per share

$

(0.68)

$

0.58

$

(2.12)

$

(0.23)

Basic weighted average number of shares outstanding

347,695,985

336,278,380

347,660,313

332,912,120

Diluted weighted average number of shares outstanding

 

347,695,985

382,677,364

347,660,313

332,912,120

See accompanying Notes to Condensed Consolidated Financial Statements.

2

Table of Contents

Riot Platforms, Inc.

Condensed Consolidated Statements of Comprehensive Income (Loss)

(Unaudited; in thousands)

Three Months Ended

Six Months Ended

June 30, 

June 30, 

2026

2025

2026

2025

Net income (loss)

$

(237,170)

$

219,454

$

(737,647)

$

(76,913)

Other comprehensive income (loss):

Unrealized holding gains (losses) on convertible note

(50)

(27)

Comprehensive income (loss)

$

(237,170)

$

219,404

$

(737,647)

$

(76,940)

See accompanying Notes to Condensed Consolidated Financial Statements.

3

Table of Contents

Riot Platforms, Inc.

Condensed Consolidated Statements of Stockholders’ Equity

(Unaudited; in thousands, except for share amounts)

Three Months Ended June 30, 2026

  ​ ​ ​

  ​ ​ ​

  ​ ​ ​

  ​ ​ ​

Total

Common Stock

Accumulated

stockholders’

Shares

Amount

deficit

equity

Balance as of April 1, 2026

 

378,978,341

$

4,248,780

$

(1,854,077)

$

2,394,703

Issuance of restricted stock, net of forfeitures and delivery of common stock underlying stock awards, net of tax withholding

 

(955,377)

 

(499)

 

 

(499)

Stock-based compensation

 

 

35,582

 

 

35,582

Net income (loss)

 

 

 

(237,170)

 

(237,170)

Balance as of June 30, 2026

 

378,022,964

$

4,283,863

$

(2,091,247)

$

2,192,616

Three Months Ended June 30, 2025

  ​ ​ ​

  ​ ​ ​

  ​ ​ ​

  ​ ​ ​

Accumulated other

  ​ ​ ​

Total

Common Stock

Accumulated

comprehensive

stockholders’

Shares

Amount

deficit

income (loss)

equity

Balance as of April 1, 2025

 

350,184,294

$

3,931,379

$

(986,786)

$

245

$

2,944,838

Issuance of restricted stock, net of forfeitures and delivery of common stock underlying stock awards, net of tax withholding

 

653,151

 

(103)

 

 

(103)

Issuance of common stock/At-the-market offering, net of offering costs

 

5,406,862

 

52,657

 

 

52,657

Stock-based compensation

 

 

30,120

 

 

30,120

Issuance of common stock for asset acquisition

6,989,800

49,000

49,000

Net income (loss)

 

 

 

219,454

 

219,454

Other comprehensive income (loss)

(50)

(50)

Balance as of June 30, 2025

 

363,234,107

$

4,063,053

$

(767,332)

$

195

$

3,295,916

Six Months Ended June 30, 2026

  ​ ​ ​

  ​ ​ ​

  ​ ​ ​

  ​ ​ ​

  ​ ​ ​

Total

Common Stock

Accumulated

stockholders'

Shares

Amount

deficit

equity

Balance as of January 1, 2026

371,575,652

$

4,212,006

$

(1,353,600)

$

2,858,406

Issuance of restricted stock, net of forfeitures and delivery of common stock underlying stock awards, net of tax withholding

 

6,447,312

 

(2,519)

 

 

(2,519)

Issuance of common stock/At-the-market offering, net of offering costs

 

 

(372)

 

 

(372)

Stock-based compensation

 

 

74,748

 

 

74,748

Net income (loss)

 

 

 

(737,647)

 

(737,647)

Balance as of June 30, 2026

 

378,022,964

$

4,283,863

$

(2,091,247)

$

2,192,616

Six Months Ended June 30, 2025

Accumulated other

Total

Common Stock

Accumulated

comprehensive

stockholders'

Shares

Amount

deficit

income (loss)

equity

Balance as of January 1, 2025

 

344,890,208

$

3,833,882

$

(690,419)

$

222

$

3,143,685

Issuance of restricted stock, net of forfeitures and delivery of common stock underlying stock awards, net of tax withholding

 

578,637

 

(587)

 

 

(587)

Issuance of common stock/At-the-market offering, net of offering costs

 

10,775,462

 

121,062

 

 

121,062

Stock-based compensation

59,696

59,696

Issuance of common stock for asset acquisition

6,989,800

49,000

49,000

Net income (loss)

(76,913)

(76,913)

Other comprehensive income (loss)

 

 

 

(27)

 

(27)

Balance as of June 30, 2025

 

363,234,107

$

4,063,053

$

(767,332)

$

195

$

3,295,916

See accompanying Notes to Condensed Consolidated Financial Statements.

4

Table of Contents

Riot Platforms, Inc.

Condensed Consolidated Statements of Cash Flows

(Unaudited; in thousands)

Six Months Ended

June 30, 

2026

  ​ ​ ​

2025

Operating activities

  ​ ​ ​

  ​

  ​

Net income (loss)

$

(737,647)

$

(76,913)

Adjustments to reconcile net income (loss) to net cash provided by (used in) operating activities:

 

  ​

 

  ​

Stock-based compensation

 

74,748

 

59,696

Depreciation and amortization

 

195,518

 

161,123

Amortization of license fee revenue

 

 

(24)

Noncash lease expense

 

4,694

 

2,651

Amortization of debt issuance costs

2,231

1,876

Change in fair value of bitcoin

401,276

(262,772)

Change in fair value of derivatives

 

60,214

 

853

Change in fair value of contingent consideration

 

 

(17,642)

Loss on contract settlement

35,518

Gain on acquisition post-close dispute settlement

(26,007)

Impairment of property and equipment

27,972

(Gain) loss on equity method investment - marketable securities

57,095

Loss (gain) on sale of equipment

 

 

479

Revenue recognized from bitcoin mined

(225,631)

(283,748)

Changes in assets and liabilities:

 

  ​

 

  ​

(Increase)/decrease in operating assets

(69,632)

(11,401)

Increase/(decrease) in operating liabilities

(6,530)

5,831

Net cash provided by (used in) operating activities

 

(272,787)

 

(353,385)

 

 

  ​

Investing activities

 

  ​

 

  ​

Acquisition of assets from Rhodium

(7,250)

Deposits on equipment

 

(41,376)

 

(86,403)

Proceeds from sale of bitcoin

732,461

131,802

Security deposits

(129)

286

Proceeds from the sale of equity method investment - marketable securities

14,662

Purchases of property and equipment, including construction in progress

 

(176,196)

 

(93,235)

Purchases of right-of-use assets

Casualty-related recoveries (charges)

(3)

119

Net cash provided by (used in) investing activities

 

514,757

 

(40,019)

 

  ​

 

  ​

Financing activities

 

  ​

 

  ​

Proceeds from the issuance of common stock / At-the-market offering

 

 

123,903

Offering costs for the issuance of common stock / At-the-market offering

 

(372)

 

(2,841)

Proceeds from revolving credit facilities

61,000

Repayments of revolving credit facilities

(6,728)

Proceeds from credit facility

200,000

Debt issuance costs

(2,396)

Repurchase of common shares to pay employee withholding taxes

 

(2,519)

 

(587)

Net cash provided by (used in) financing activities

 

(2,891)

 

372,351

 

  ​

 

  ​

Net increase (decrease) in cash and cash equivalents and restricted cash

 

239,079

 

(21,053)

Cash and cash equivalents and restricted cash at beginning of period

 

309,789

 

351,301

Cash and cash equivalents and restricted cash at end of period

$

548,868

$

330,248

See accompanying Notes to Condensed Consolidated Financial Statements.

5

Table of Contents

Riot Platforms, Inc.

Condensed Consolidated Statements of Cash Flows – Continued

(Unaudited; in thousands)

Six Months Ended June 30, 

2026

  ​ ​ ​

2025

Supplemental information:

 

  ​

 

  ​

Cash paid for interest, net of amounts capitalized

$

3,616

$

1,918

Cash paid for taxes

$

60

$

871

Non-cash transactions

 

  ​

 

  ​

Reclassification of deposits to property and equipment

$

86,460

$

27,573

Construction in progress included in accrued expenses and other current liabilities

$

35,597

$

415

Bitcoin exchanged for employee compensation

$

1,618

$

3,334

Right-of-use assets exchanged for new operating lease liabilities

$

13,564

$

5,962

The following reconciles cash, cash equivalents, and restricted cash to the amounts presented above:

Cash, cash equivalents, and restricted cash, beginning of the period:

Cash and cash equivalents

$

233,517

$

277,860

Restricted cash

76,272

73,441

Total cash, cash equivalents, and restricted cash as presented above

$

309,789

$

351,301

Cash, cash equivalents, and restricted cash, end of the period:

Cash and cash equivalents

$

471,383

$

255,371

Restricted cash

77,485

74,877

Total cash, cash equivalents, and restricted cash as presented above

$

548,868

$

330,248

See accompanying Notes to Condensed Consolidated Financial Statements.

6

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

Note 1. Organization and Description of Business

Riot Platforms, Inc. is a vertically integrated digital infrastructure company principally engaged in developing and optimizing its large-scale power assets. The Company’s business strategy centers on enhancing its electrical infrastructure and deploying it across complementary platforms: (i) bitcoin mining and (ii) scalable data center solutions designed to support non-mining workloads. By leveraging its energy portfolio, engineering capabilities, and operational footprint, the Company aims to capitalize on both the long-term potential of bitcoin and the accelerating demand for power-intensive compute.

The Company owns and manages multiple large-scale data center facilities in Texas and Kentucky. The Company provides mission-critical power and infrastructure for Bitcoin Mining at its facilities in Rockdale, Texas (the “Rockdale Facility”), Navarro County, Texas (the “Corsicana Facility”), and its two sites in Kentucky (the “Kentucky Facility,” and together with the Rockdale Facility and the Corsicana Facility, the “Facilities”), and for non-mining Data Center operations at the Rockdale Facility. The Rockdale Facility currently provides up to approximately 700 megawatts (“MW”) of developed capacity for Bitcoin Mining and data center leasing. The Corsicana Facility is currently equipped to provide up to approximately 400 MW of developed capacity for Bitcoin Mining, and upon completion, is expected to have a total of approximately one gigawatt (“GW”) of developed capacity available for high-density compute workloads. The Kentucky Facility currently provides approximately 192 MW of developed capacity.

In 2025, the Company began leveraging its core competencies in power optimization, strategic land acquisition, engineering design, and construction execution to develop and monetize portions of its existing facilities and power pipeline through the provision of data center leasing services. During the six months ended June 30, 2026, the Company and Advanced Micro Devices, Inc. (“AMD”) entered into a long-term data center lease agreement (the “AMD Lease”) and amendment to the AMD Lease (the “AMD Lease Amendment”) at the Rockdale Facility for the deployment of 50 MW of critical IT load capacity, with the potential for additional expansion of up to a total of 200 MW of critical IT load capacity. See Note 3. Data Center Operations.  

In August 2026, the Company and a leading frontier AI lab, (the “Tenant”), entered into a long-term data center lease agreement (the “Tenant Lease”) at the Rockdale Facility for an initial deployment of 191 MW of critical IT load capacity. See Note 3. Data Center Operations.  

As described in Note 18. Segment Information, the Company operates in three reportable business segments: Bitcoin Mining, Data Center, and Engineering.

Note 2. Summary of Significant Accounting Policies and Recent Accounting Pronouncements

Basis of presentation and principles of consolidation

The accompanying unaudited condensed consolidated financial statements (“Condensed Consolidated Financial Statements”) and these notes (“Notes”) have been prepared in accordance with accounting principles generally accepted in the United States of America (“GAAP”). In the opinion of management, the Condensed Consolidated Financial Statements reflect all adjustments, consisting of normal and recurring adjustments, considered necessary for a fair presentation of such interim results. Unless otherwise indicated, amounts are stated in thousands of U.S. dollars, except for: share, per share, megawatt hours (“MWh”), MW, GW, and miner quantities; bitcoin quantities, prices, and hash rate; cost to mine one bitcoin; and production value of one bitcoin mined.

The results in the Condensed Consolidated Financial Statements and these Notes include required estimates and assumptions of management, and they are not necessarily indicative of results to be expected for the year ending December 31, 2026, or for any future interim period. Further, the Condensed Consolidated Financial Statements and these Notes do not include all the information and notes required by GAAP for a complete presentation of annual financial statements. As such, the Condensed Consolidated Financial Statements and these Notes should be read in conjunction with the consolidated financial statements for the year ended December 31, 2025, and notes thereto included in the 2025 Annual Report.

Use of estimates

The preparation of financial statements in conformity with GAAP requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities, the disclosure of contingent assets and liabilities at the date of the balance sheets, and the reported amounts of revenue and expenses during the reporting periods. Actual results may differ materially from those estimates. The most significant accounting estimates inherent in the preparation of the Company’s financial statements include

7

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

revenue recognition; valuation of the derivatives classified under Level 3 on the fair value hierarchy; determination of the useful lives and recoverability of long-lived assets; impairment analysis of fixed assets and finite-lived intangibles; impairment analysis of goodwill; allocating the fair value of purchase consideration to assets acquired and liabilities assumed in business acquisitions; stock-based compensation; and the valuation allowance associated with the Company’s deferred tax assets.

Reclassifications

Certain prior period amounts have been reclassified to conform to the current period presentation. These reclassifications did not have a material impact on the Company’s Condensed Consolidated Financial Statements and related disclosures.

Significant Accounting Policies

Except for the updates noted below, see the Company’s 2025 Annual Report for a detailed discussion of the Company’s significant accounting policies.

Revenue Recognition

Data Center Revenue

The Company generates revenue from its Data Center operations by leasing certain of its property and power access to tenants. Those leases include lease and non-lease components. The Company elected the practical expedient under ASC Topic 842, Leases (“ASC 842”) to combine lease components and non-lease components, including provisioning of power, with the same transfer pattern as lease components. If the lease components are predominant and the underlying leases qualify as operating leases, the combined component is accounted for under ASC 842 as lease revenue. Recognition begins when the asset is available for customer use. The Company classifies its leases as operating, sales-type, or direct financing at lease commencement, which determines the pattern of revenue recognition and the presentation of lease-related activity in the Condensed Consolidated Statements of Operations over the lease term.

The Company provides tenant fit-out services, including the procurement and installation of equipment, in accordance with the terms of the respective lease agreements. Tenants are required to reimburse the Company for all costs incurred in the provision of these services. Tenant fit-out services do not have the same transfer pattern as the lease components and are therefore subject to recognition under ASC Topic 606, Revenue from Contracts with Customers (“ASC 606”). Tenant fit-out reimbursement revenue is recognized using the percentage-of-completion method, calculated by dividing the total costs incurred by total costs expected to be incurred, which the Company believes to be the most accurate measure of progress toward the satisfaction of the performance obligation.

Contract Balances

The timing of revenue recognition, billings, and cash collections result in accounts receivable, contract assets, and contract liabilities. A receivable is recorded at the invoice amount, net of an allowance for credit losses, in the period in which products or services are provided and when the right to consideration is unconditional. In instances where the timing of revenue recognition differs from the timing of invoicing, the Company has determined that its contracts do not include a significant financing component. The Company assesses collectability based on several factors, including its past transaction history with the customer and the creditworthiness of the customer.

Any amounts that were previously recognized as revenue and subsequently determined to be uncollectible are charged to bad debt expense.

A contract asset exists when products or provided services have been transferred to customers but payment is conditioned on reasons other than the passage of time, such as upon the satisfaction of additional performance obligations. Revenue is recognized over the contract term, which could potentially give rise to contract assets during certain periods.

A contract liability is recognized when the Company has an unconditional right to a payment before it transfers the products or services to customers.

8

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

Change in Reportable Segments

As of December 31, 2025, the Company operated in two reportable business segments: Bitcoin Mining and Engineering. As of June 30, 2026, the Company operated in three reportable business segments: Bitcoin Mining, Data Center, and Engineering.

During the first quarter of 2026, the Company’s execution of a significant data center lease with AMD resulted in material Data Center revenue and the commencement of discrete financial performance analysis by the chief operating decision maker (“CODM”). Accordingly, the Company’s data center operations now meet the quantitative and qualitative requirements to be recognized as a separate reportable segment.

Prior to 2024, the Company had a legacy Data Center Hosting bitcoin mining segment as a separate operating and reportable segment but has since terminated all contracts with its legacy Data Center Hosting bitcoin mining customers. Beginning in the three months ended March 31, 2024, the CODM ceased analyzing the performance of the Data Center Hosting operations and the Company ceased reporting Data Center Hosting as a separate reportable business segment. Residual activity of the legacy Data Center Hosting bitcoin mining segment is included in Revenue: Other revenue on the Condensed Consolidated Statements of Operations. The Company has no plans to offer data center hosting bitcoin mining services to new customers. The Company’s new Data Center operating segment is not a recommencing of the legacy Data Center Hosting bitcoin mining operations because the new Data Center operating segment offers different services and has different processes, customer types, and economic characteristics from the legacy Data Center Hosting bitcoin mining segment.

See Note 18. Segment Information for further discussion of the Company’s reportable segments.

Recently Issued Accounting Pronouncements

The Company continually assesses new accounting pronouncements to determine their applicability. When it is determined that a new accounting pronouncement affects the Company’s financial reporting, the Company undertakes a study to determine the consequences of such change to its Condensed Consolidated Financial Statements and ensures that there are proper controls in place to ensure that the Company’s Condensed Consolidated Financial Statements properly reflect the change.

In November 2024, the FASB issued ASU No. 2024-03, Income Statement—Reporting Comprehensive Income—Expense Disaggregation Disclosures (Subtopic 220-40) (“ASU 2024-03”). ASU 2024-03 requires, in the notes to the annual and interim financial statements, disaggregated information about certain income statement expense line items. ASU 2024-03 is effective for annual reporting periods beginning after December 15, 2026, and interim reporting periods beginning after December 15, 2027. Early adoption is permitted. The Company is evaluating the impact of the updated guidance on the Company’s Consolidated Financial Statements and disclosures.

Note 3. Data Center Operations

In 2025, the Company began leveraging its core competencies in power optimization, strategic land acquisition, engineering design, and construction execution to develop and monetize portions of its existing facilities and power pipeline through the provision of data center leasing services.

AMD Lease

In January 2026, the Company entered into the AMD Lease, a long-term data center lease agreement with AMD, a leading innovator in high-performance computing, graphics, and visualization technologies, at the Rockdale Facility. The AMD Lease included an initial deployment of 25 MW of critical IT load capacity delivered in phases beginning with 5 MW of critical IT load capacity that was delivered in January 2026 and the remaining 20 MW that was delivered in May 2026. The AMD Lease carries a term of 10 years, with three five-year extension options. The AMD Lease included an expansion option for an additional 75 MW of critical IT load capacity and a right of first refusal for another 100 MW, totaling 200 MW.

In April 2026, the Company entered into the AMD Lease Amendment, in which AMD exercised a portion of the existing expansion option in the AMD Lease to provide an additional deployment of 25 MW of critical IT load capacity to be delivered in phases beginning with 10 MW of critical IT load capacity expected to be delivered in November 2026 and the remaining 15 MW expected

9

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

to be delivered in May 2027. Under the AMD Lease Amendment, AMD holds a remaining balance of 50 MW of reserved critical IT load capacity under the existing expansion option. The AMD Lease Amendment also grants AMD a conditional, first-priority right to lease up to an additional 100 MW of critical IT load capacity, exercisable in increments of not less than 50 MW. If both the remaining 50 MW of reserved capacity under the existing expansion option and the additional 100 MW option are fully exercised, AMD’s total leased capacity at the Rockdale Facility would increase to 200 MW. This conditional, first-priority right replaces the right of first refusal for an additional 100 MW previously granted to AMD in the AMD Lease.

Under the AMD Lease, power is provided to AMD at pass-through rates and recognized as variable lease revenue in the same period the related expenses are incurred.

The Company is also required to provide tenant fit-out services to AMD. Tenant fit-out services include the procurement and installation of customer-specific equipment provided in accordance with the terms of the AMD Lease and the AMD Lease Amendment. All associated costs incurred by the Company plus a margin will be reimbursable and paid by AMD.

The following table presents the components of the Company’s Data Center revenue for the three and six months ended June 30, 2026:

Three Months Ended

Six Months Ended

June 30, 

June 30, 

2026

2026

Operating lease revenue

$

4,542

$

5,442

Variable lease revenue, including power reimbursement

353

380

Tenant fit-out reimbursement revenue

18,318

50,541

Total Data Center revenue

$

23,213

$

56,363

The following table presents the Company’s future minimum operating lease payments to be received as of June 30, 2026. The table includes only base rent and excludes reimbursements and variable lease components:

Remainder of 2026

$

15,210

2027

 

48,870

2028

56,593

2029

 

58,293

2030

 

60,042

Thereafter

 

393,963

Total undiscounted lease payments

$

632,971

Subsequent Tenant Lease

In August 2026, the Company entered into the Tenant Lease to provide 191 MW of critical IT load capacity at the Rockdale Facility. The Tenant Lease includes an initial deployment of 96 MW of critical IT load capacity anticipated to be delivered in December 2027, with the remaining capacity anticipated to be delivered in June 2028.

The Tenant Lease carries an initial term of 20 years, commencing upon full deployment anticipated in June 2028, includes provisions for two successive five-year renewal terms at the option of the lessee, and is expected to generate approximately $9.1 billion in base rent over the initial term.

In August 2026, Riot DC Logistics LLC, a wholly owned subsidiary of the Company (the “Borrower”), entered into a $573.0 million interim credit facility (the “$573 Million Credit Facility”) with the lenders party thereto and Morgan Stanley Senior Funding, Inc., as administrative agent, to fund long-lead equipment procurement and other development costs for the Tenant Lease. The facility matures on October 15, 2026, subject to extension in certain circumstances in connection with the Company's re-financing of the $573 Million Credit Facility, and bears interest at a variable rate of the Secured Overnight Financing Rate (“SOFR”) plus 2.75%, and is secured by substantially all assets of the Borrower related to the project. The $573 Million Credit Facility is non-recourse to Riot Platforms, Inc., subject to customary non-recourse carve-outs.

10

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

Note 4. Revenue from Contracts with Customers

Disaggregated revenue

Revenue disaggregated by reportable segment is presented in Note 18. Segment Information.

Contract assets

Contract assets are recognized as a result of incurring costs in excess of amounts billed on uncompleted Engineering contracts and uncompleted amounts related to Data Center tenant fit-out services. As of June 30, 2026, contract assets of $19.9 million consisted of $12.5 million attributable to Engineering contracts and $7.4 million attributable to Data Center tenant fit-out services. As of December 31, 2025, contract assets of $8.3 million were attributable to Engineering.

Contract liabilities

Contract liabilities are recognized as a result of amounts billed exceeding costs incurred on uncompleted Engineering contracts and uncompleted amounts related to Data Center tenant fit-out services. As of June 30, 2026, contract liabilities of $65.6 million consisted of $63.1 million attributable to Engineering contracts and $2.5 million attributable to deferred revenue on Data Center tenant fit-out services. As of December 31, 2025, contract liabilities of $37.1 million were attributable to Engineering.

For the three months ended June 30, 2026 and 2025, the beginning balance of contract liabilities recognized as revenue was $16.4 million and $2.4 million, respectively, and $22.2 million and $6.9 million, respectively, for the six months ended June 30, 2026 and 2025.

For the three months ended June 30, 2026 and 2025, revenue recognized as a result of satisfying performance obligations in previous periods was $0.1 million and $0.1 million, respectively, and $ (0.6) million and $(0.4) million, respectively, for the six months ended June 30, 2026 and 2025.

Remaining performance obligation

The following table presents the estimated future recognition of the Company’s remaining performance obligations, which represent the transaction price of current contracts for work to be performed.

Remainder of

2026

  ​ ​ ​

2027

  ​ ​ ​

2028

Total

Data Center

 

$

2,469

 

$

 

$

$

2,469

Engineering

 

$

100,724

 

$

126,837

 

$

1,663

$

229,224

11

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

Note 5. Bitcoin

The following table presents information about the Company’s bitcoin:

  ​ ​ ​

Quantity

  ​ ​ ​

Amounts

Balance as of January 1, 2026

18,005

$

1,575,441

Revenue recognized from bitcoin mined

3,060

225,631

Change in bitcoin receivable

(2)

321

Proceeds from sale of bitcoin

(9,665)

(732,461)

Exchange of bitcoin for employee compensation

(18)

(1,618)

Change in fair value of bitcoin

(401,276)

Balance as of June 30, 2026

11,380

$

666,038

The following reconciles Bitcoin and Restricted bitcoin as of June 30, 2026 to the amounts above:

Bitcoin

5,559

$

325,370

Restricted bitcoin (a)

5,821

$

340,668

Total

11,380

$

666,038

Carrying value of bitcoin as of June 30, 2026 (b)

$

1,030,222

Realized gains (losses) on the sale or exchange of bitcoin for the three months ended June 30, 2026 (c)

$

(72,135)

Realized gains (losses) on the sale or exchange of bitcoin for the six months ended June 30, 2026 (c)

$

(113,209)

Revenue recognized from bitcoin mined for the three months ended June 30, 2026

$

113,736

Change in fair value of bitcoin for the three months ended June 30, 2026

$

(74,607)

Balance as of January 1, 2025

17,722

$

1,654,468

Revenue recognized from bitcoin mined

2,956

283,748

Change in bitcoin receivable

(272)

Proceeds from sale of bitcoin

(1,371)

(131,802)

Exchange of bitcoin for employee compensation

(34)

(3,334)

Change in fair value of bitcoin

262,772

Balance as of June 30, 2025

19,273

$

2,065,580

The following reconciles Bitcoin and Restricted bitcoin as of June 30, 2025 to the amounts above:

Bitcoin

15,973

$

1,711,908

Restricted bitcoin (a)

3,300

$

353,672

Total

19,273

$

2,065,580

Carrying value of bitcoin as of June 30, 2025 (b)

$

1,246,192

Realized gains on the sale or exchange of bitcoin for the three months ended June 30, 2025 (c)

$

3,934

Realized gains on the sale or exchange of bitcoin for the six months ended June 30, 2025 (c)

$

3,787

Revenue recognized from bitcoin mined for the three months ended June 30, 2025

$

140,889

Change in fair value of bitcoin for the three months ended June 30, 2025

$

470,812

(a)Restricted bitcoin is the Company’s bitcoin pledged as collateral for the Company’s $200 Million Credit Facility. See Note 11. Debt for more information.
(b)The carrying value of bitcoin is equal to the initial value of bitcoin as determined for revenue recognition purposes.
(c)Bitcoin is sold on a first-in, first-out (FIFO) basis. Realized gains (losses) recognized on sales of bitcoin and exchanges of bitcoin for employee compensation are included in Change in fair value of bitcoin on the Condensed Consolidated Statements of Operations.

12

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

All additions of bitcoin during the periods presented were the result of bitcoin generated by the Company’s Bitcoin Mining operations. All dispositions of bitcoin were the result of sales on the open market to fund Company operations and for compensation for certain employees.

Note 6. Property and Equipment

The following table presents the Company’s property and equipment:

  ​ ​ ​

June 30, 

December 31, 

  ​ ​ ​

2026

  ​ ​ ​

2025

Buildings and building improvements

$

879,315

$

803,027

Land rights and land improvements

 

160,333

 

160,333

Miners and mining equipment

869,697

 

945,700

Machinery and facility equipment

69,939

54,948

Office and computer equipment

 

4,751

 

4,132

Construction in progress

 

188,657

 

165,621

Total cost of property and equipment

 

2,172,692

 

2,133,761

Less accumulated depreciation

 

(618,279)

 

(605,045)

Property and equipment, net

$

1,554,413

$

1,528,716

The Company incurred impairment charges of $28.0 million for its property and equipment during the three and six months ended June 30, 2026, due to certain long-lead items, previously included in Construction in progress related to the planned expansion of the Rockdale Facility for bitcoin mining purposes, being deemed to be impaired as a result of the Company’s decision to expand the Rockdale Facility for data center application purposes. The Company did not incur any impairment charges for its property and equipment during the three and six months ended June 30, 2025.

For the three months ended June 30, 2026 and 2025, depreciation expense related to property and equipment totaled $96.6 million and $82.2 million, respectively, and $193.3 million and $159.1 million, respectively, for the six months ended June 30, 2026 and 2025.

Miners and mining equipment

As of June 30, 2026, the Company had deployed miners in its Bitcoin Mining operations at each of the Facilities.

During the year ended December 31, 2023, the Company entered into a long-term master purchase and sales agreement, dated as of June 23, 2023, as amended (the “Master Agreement”), to acquire miners from MicroBT Electronics Technology Co., Ltd., through its manufacturing affiliate, SuperAcme Technology (Hong Kong) Limited (collectively, “MicroBT”). Between 2023 and 2026, the Company executed purchase orders with MicroBT to acquire U.S.-manufactured miners with a total hash rate of 50.9 exahash per second (“EH/s”), for a total purchase price of approximately $795.2 million, subject to downward adjustment, as provided under the Master Agreement. Delivery of these miners began in 2023, and all miners under these purchase orders are expected to be received through the fourth quarter of 2026, with deployment continuing on an ongoing basis.

13

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

Note 7. Intangible Assets

Finite-lived intangible assets

The following table presents the Company’s finite-lived intangible assets as of June 30, 2026:

  ​ ​ ​

Weighted-

Gross

Accumulated

Net book

average life

  ​ ​ ​

book value

  ​ ​ ​

amortization

  ​ ​ ​

value

  ​ ​ ​

(years)

Customer contracts

$

29,400

$

(6,403)

$

22,997

 

10

Trademark

 

6,100

 

(2,461)

 

3,639

 

10

UL Listings

 

2,700

 

(1,031)

 

1,669

 

12

Patent licenses

10,060

(10,060)

Various

Finite-lived intangible assets

$

48,260

$

(19,955)

$

28,305

The following table presents the Company’s finite-lived intangible assets as of December 31, 2025:

  ​ ​ ​

Weighted-

Gross

  ​ ​ ​

Accumulated

  ​ ​ ​

Net book

average life

  ​ ​ ​

book value

  ​ ​ ​

amortization

  ​ ​ ​

value

  ​ ​ ​

(years)

Customer contracts

$

29,400

$

(4,938)

$

24,462

 

10

Trademark

 

6,100

 

(2,156)

 

3,944

 

10

UL Listings

 

2,700

 

(919)

 

1,781

 

12

Patent licenses

10,060

(10,060)

Various

Finite-lived intangible assets

$

48,260

$

(18,073)

$

30,187

For the three months ended June 30, 2026 and 2025, amortization expense related to finite-lived intangible assets was $0.9 million and $1.0 million, respectively, and $1.9 million and $2.0 million, respectively, for the six months ended June 30, 2026 and 2025.

The following table presents the estimated future amortization of the Company’s finite-lived intangible assets as of June 30, 2026:

Remainder of 2026

$

1,888

2027

 

3,775

2028

 

3,775

2029

 

3,775

2030

 

3,775

Thereafter

 

11,317

Total

$

28,305

The Company did not identify any impairment of its finite-lived intangible assets during the three and six months ended June 30, 2026 and 2025.

14

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

Note 8. Power Supply Agreements

Rockdale Facility

Power Purchase Agreement

In May 2020, Whinstone US, Inc. (“Whinstone”), the Company’s subsidiary, entered into a long-term power purchase agreement (the “Rockdale PPA”) to provide power at fixed prices to the Rockdale Facility, via the nearby Sandow Switch. Under the Rockdale PPA, the Company has contracted for a total of 345 MW of long-term, fixed-price power, in three blocks: 130 MW contracted in May 2020, through April 30, 2030; 65 MW contracted in March 2022, through April 30, 2030; and 150 MW contracted in November 2022, through October 31, 2027. The Rockdale PPA also permits the purchase of additional power at market prices, as needed.

Under the Rockdale PPA, the Company may elect not to use its contracted power for operations and instead elect to sell that power in exchange for credits against future power costs when doing so is economically beneficial to the Company, depending on the spot market price of electricity. The Company’s power strategy combines participation in Demand Response Service Programs, as defined below, participation in Electric Reliability Council of Texas, Inc.’s (“ERCOT”) Four Coincident Peak program (the “4CP Program”), and sales of power, to attempt to manage operating costs most efficiently.

For the three months ended June 30, 2026 and 2025, the Company earned credits against future power costs in exchange for power resold of approximately $10.1 million and $8.3 million, respectively, and approximately $31.1 million and $16.1 million, respectively, for the six months ended June 30, 2026 and 2025. These amounts are recorded in Power curtailment credits on the Condensed Consolidated Statements of Operations.

The Company determined the Rockdale PPA meets the definition of a derivative because it allows for net settlement. However, because the Company has the ability to offer the power back for sale outside of the Rockdale PPA, rather than taking physical delivery, the Company determined that physical delivery is not probable through the entirety of the contract and therefore, the Company does not believe the normal purchases and normal sales scope exception applies to the Rockdale PPA. Accordingly, the Rockdale PPA (a non-hedging derivative contract) is accounted for as a derivative and recorded at its estimated fair value, with the change in the fair value recorded in Change in fair value of derivatives on the Condensed Consolidated Statements of Operations. The Rockdale PPA is not designated as a hedging instrument. The Demand Response Service Programs (as defined below), and the 4CP Program are not part of the Rockdale PPA and are therefore not subject to treatment and valuation as a derivative along with the Rockdale PPA.

The terms of the Rockdale PPA require margin-based collateral, calculated as exposure resulting from fluctuations in the market rate of electricity relative to the fixed price stated in the contract. As of June 30, 2026, the margin-based collateral requirement was zero.

While the Company manages operating costs at the Rockdale Facility in part by periodically selling back unused or uneconomic power, the Company does not consider such actions to be trading activities.

Demand Response Service Programs

ERCOT offers demand response service programs for customers, including the Company, that can reduce or modify electricity consumption in response to ERCOT instructions or signals (“Demand Response Service Programs”). These Demand Response Service Programs provide the ERCOT market with valuable grid stability and economic services by helping to preserve system reliability, enhancing competition and load predictability, mitigating price spikes, and stabilizing the grid by encouraging the demand side of the market to give more visibility and control of their power consumption to grid operators. Market participants with flexible electrical loads, such as the Company, may participate in these Demand Response Service Programs directly by offering their electrical loads into the ERCOT markets, or indirectly by voluntarily reducing their energy usage in response to increasing power demand in the ERCOT marketplace. The Demand Response Service Programs operate concurrently with the Rockdale PPA.

Under these Demand Response Service Programs, the Company may participate in various ancillary services by designating a portion of its available electrical load for forward market bidding. Participation in the Demand Response Service Programs is compensated based on hourly power rates and the volume of load bid into each program. Through ancillary services, the Company competitively bids among other market participants to sell ERCOT the ability to control the Company’s electrical load on demand. This requires

15

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

the Company to remain powered on during the times in which its power is bid into ancillary services, allowing ERCOT the ability to direct the Company to power down the amount of power bid into the program. The Company receives compensation for its participation in ancillary services whether or not the Company is actually called to power down.

The Company also participates in the 4CP Program, which refers to the highest-load settlement intervals in each of the four summer months (June, July, August, and September), when demand on the ERCOT grid is typically at its highest. The 4CP Program participants may voluntarily power down operations during these times and in doing so, reduce the electrical load demand on the ERCOT grid. Participants that reduce their load during these peak periods receive credits toward transmission costs on future power bills, reducing overall power costs for the subsequent year. The 4CP Program has an indefinite duration.

Corsicana Facility

During the year ended December 31, 2024, the Company’s subsidiary, Riot Corsicana, LLC, entered into an agreement with ICE Futures U.S., Inc., a subsidiary of InterContinental Exchange, Inc., to access the exchange for the execution of electricity futures contracts. The Company intends to enter into electricity futures contracts up to the amount of power used at the Corsicana Facility. These financial instruments meet the definition of derivatives, but are not designated as hedging instruments, and will be recognized at fair value, with any gains or losses recognized in Net income (loss) on the Condensed Consolidated Statements of Operations.

The Company enters into electricity futures contracts to manage electricity price risks and reduce the variability of cash flows associated with purchases of electricity used for the Company’s Bitcoin Mining operations at its Corsicana Facility.

As of June 30, 2026, the Company held outstanding electricity futures contracts for 805,120 MWh with a combined fair value of $1.5 million included in Prepaid expenses and other current assets on the Condensed Consolidated Balance Sheets.

The following table presents the realized and unrealized gains and losses recognized by the Company on its electricity futures, which are recognized in Other income (expense) on the Condensed Consolidated Statements of Operations:

Three Months Ended

Six Months Ended

June 30, 

June 30, 

2026

2025

2026

2025

Realized gain (loss)

$

0.3

$

(0.1)

$

1.0

$

(0.1)

Unrealized gain (loss)

$

(0.1)

$

(0.1)

$

(1.2)

$

(0.2)

During the year ended December 31, 2024, the Company’s subsidiary, Riot Corsicana, LLC, entered into a requirements contract with MEMS Industrial Supply (“MEMSIS”) under which it will purchase retail power to meet the consumption requirements of the Corsicana Facility. Electric power will be invoiced by MEMSIS based on the market price for electric power at the ERCOT North Load Zone, plus a retail adder corresponding to the peak consumption threshold of the Corsicana Facility, and pass-through charges (including ancillary charges, taxes, congestion, and line loss), based on the actual variable consumption of the Corsicana Facility. The contract, dated November 12, 2024, has a three-year term ending November 25, 2027. Although this contract does not require the supply of power at a fixed price, it allows the parties to enter into fixed-price contracts. 

 

Under the requirements contract with MEMSIS, during the year ended December 31, 2024, Riot and MEMSIS entered into a power purchase agreement (the “Corsicana PPA”), a three-year contract (January 1, 2025 through December 31, 2027, but excluding July and August contracts during the period) for a fixed quantity of 25 MW at a fixed price of $43.95 per MWh.

The Company determined the Corsicana PPA meets the definition of a derivative and, accordingly, the Corsicana PPA (a non-hedging derivative contract) is recorded at its estimated fair value each reporting period on the Condensed Consolidated Balance Sheets with the change in the fair value recorded in Change in fair value of derivatives on the Condensed Consolidated Statements of Operations. The Corsicana PPA is not designated as a hedging instrument.

Kentucky Facility

In April 2021, the Company’s subsidiary, Block Mining, Inc. (“Block Mining”), entered into a long-term power purchase agreement, and subsequent amendments to the long-term power purchase agreement (collectively, the “Kentucky PPA”), to provide power to one of its locations in Kentucky. Pursuant to the Kentucky PPA, the Company has the ability, but not the obligation, to acquire up

16

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

to a total of 67 MW of power at one of its facilities through mid-April 2041. The all-in power rate includes a portion of the total fee that is at a fixed rate and another portion that adjusts annually. The Company determined the Kentucky PPA does not meet the definition of a derivative because it does not contain any net settlement provisions.

Under the Kentucky PPA, the Company may elect not to use its long-term, fixed-price power for its operations, and instead elect to sell that power back into the Midcontinent Independent System Operator, Inc. (“MISO”) grid in exchange for credits against future power costs when there is a benefit to the Company, depending on the spot market price of electricity. The Company’s power strategy combines participation in Demand Response Service Programs and sales of power, to attempt to manage operating costs efficiently.

Derivative Valuations

The Company’s contracts accounted for as derivatives include the Rockdale PPA and Corsicana PPA.

The following table presents the unobservable inputs used in the valuation of the Company’s derivatives:

Valuation Date

Significant Unobservable Input

Range

Average

June 30, 2026

Forward prices (per MWh)

$

33.39

-

$

96.07

$

48.60

December 31, 2025

Forward prices (per MWh)

$

36.09

-

$

106.51

$

55.70

Rockdale PPA

For all periods presented, the fair value of the Rockdale PPA was in an asset position and included in Derivative assets on the Condensed Consolidated Balance Sheets.

The following table presents the changes in the estimated fair value of the Rockdale PPA:

Derivative asset balance as of January 1, 2025

$

148,673

Change in fair value:

 

Change due to future price curve

(3,902)

Change due to passage of time and settlements

2,220

Total change in fair value

(1,682)

Derivative asset balance as of June 30, 2025

$

146,991

Derivative asset balance as of January 1, 2026

$

147,026

Change in fair value:

 

Change due to future price curve

(60,301)

Change due to passage of time and settlements

1,740

Total change in fair value

(58,561)

Derivative asset balance as of June 30, 2026

$

88,465

Corsicana PPA

As of June 30, 2026, the fair value of the Corsicana PPA was in a liability position of $0.6 million, which was included in Accrued expenses and other current liabilities on the Condensed Consolidated Balance Sheets, due to a significant decline in forward power prices used to determine the fair value, relative to the contracted price. As of January 1, 2025, June 30, 2025, and December 31, 2025, the fair value was in an asset position and included in Derivative assets on the Condensed Consolidated Balance Sheets.

17

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

The following table presents the changes in the estimated fair value of the Corsicana PPA:

Derivative asset balance as of January 1, 2025

$

822

Change in fair value:

 

Change due to future price curve

657

Change due to passage of time and settlements

172

Total change in fair value

829

Derivative asset balance as of June 30, 2025

$

1,651

Derivative asset balance as of January 1, 2026

$

1,022

Change in fair value:

 

Change due to future price curve

(1,902)

Change due to passage of time and settlements

249

Total change in fair value

(1,653)

Derivative liability balance as of June 30, 2026

$

(631)

The estimated fair values of the Rockdale PPA and Corsicana PPA are classified under Level 3 of the fair value hierarchy due to the significant unobservable inputs used in the valuation. These inputs include the fixed price of each block for the 345 MW of power to be delivered under the Rockdale PPA and 25 MW of power to be delivered under the Corsicana PPA. The valuation relies on discounted cash flow estimation models incorporating quoted commodity exchange spot and forward prices in MWh adjusted for basis spreads for load zone-to-hub differentials through the term of the Rockdale PPA, which is scheduled to end as of April 30, 2030, and the term of the Corsicana PPA, which is scheduled to end as of December 31, 2027, and a discount rate of 24.1%. Actual power usage is not a variable input in the determination of the fair value as the price and quantity of power to be delivered per the Rockdale PPA and the Corsicana PPA are fixed despite the existence of multiple blocks with separate power amounts.

The discount rate reflects the nature of the contract as it relates to the risk and uncertainty of the estimated future mark-to-market adjustments, forward price curves of the power supply, broker/dealer quotes, and other similar data obtained from quoted market prices or independent pricing vendors, risk-free rate of return, which is determined from United States Treasury Bond yields, estimated cost of debt, which includes a Moody’s rating, and an equity risk premium based on market data provided by a global cost of capital service provider. The discount rate includes observable market inputs, but also includes unobservable inputs based on qualitative judgment related to the Company’s credit risk.

Note 9. Deposits

The following table presents the activity of the Company’s deposits paid:

Deposits on equipment:

Balance as of January 1, 2026

$

52,659

Additions

 

41,376

Reclassifications to property and equipment

(86,460)

Balance as of June 30, 2026

$

7,575

Security deposits:

Balance as of January 1, 2026

$

23,852

Additions

141

Deposits returned

(12)

Balance as of June 30, 2026

23,981

Total long-term deposits

$

31,556

Deposits on Equipment

During the six months ended June 30, 2026, the Company made deposits and advance payments of $41.4 million to MicroBT for the purchase of miners and reclassified $86.5 million of deposits made to MicroBT (see Note 6. Property and Equipment).

18

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

Security Deposits

During the year ended December 31, 2023, the Company paid $23.0 million, all of which remains held as a deposit as of June 30, 2026, as a security deposit in connection with its 215 MW increase to the long-term, fixed-price power secured under the Rockdale PPA, resulting in a total of 345 MW under contract at fixed prices at the Rockdale Facility (see Note 8. Power Supply Agreements).

The remainder of the Company’s security deposits consisted of approximately $1.0 million for its offices and facilities.

Note 10. Accrued Expenses and Other Current Liabilities

Accrued expenses and other current liabilities consist of the following:

  ​ ​ ​

June 30, 

December 31, 

2026

2025

Property and equipment

$

35,597

$

51,288

Power related costs

 

22,593

 

27,006

Compensation

14,329

20,940

Insurance

 

248

 

40

Sales and property tax payable

9,239

11,228

Interest

3,412

3,647

Legal settlement

20,000

Other

 

15,606

 

8,703

Total accrued expenses and other current liabilities

$

101,024

$

142,852

Note 11. Debt

2030 Notes

The Company’s 0.75% Convertible Senior Notes due 2030 (the “2030 Notes”) are recognized as long-term debt on the Condensed Consolidated Balance Sheets, net of unamortized debt issuance costs. As of June 30, 2026, the amount recognized was $583.7 million, consisting of $594.4 million principal less $10.6 million of unamortized debt issuance costs.

For the three months ended June 30, 2026 and 2025, amortization of the deferred issuance costs was $0.7 million and $0.7 million, respectively, and $1.5 million and $1.5 million, respectively, for the six months ended June 30, 2026 and 2025.

As of June 30, 2026, the 2030 Notes had an estimated fair value of approximately $1.2 billion. The estimated fair value is based on quoted prices in an active market and valued at the closing price reported at the end of the period and therefore represents a Level 1 measurement on the fair value hierarchy.

The 2030 Notes are convertible at the option of the holders during the third quarter 2026 because the closing price of the Company’s common stock exceeded 130% of the applicable conversion price for at least 20 trading days in the 30 consecutive trading days ending on June 30, 2026. The Company has the ability and intent to settle potential conversions in the Company’s common stock, at its election. As such, the 2030 Notes continue to be classified as long-term debt on the Company’s Condensed Consolidated Balance Sheets.

Revolving Credit Facilities

$50 Million Credit Facility

In July 2024, the Company entered into a one-year $50.0 million Revolving Credit Facility (the “$50 Million Credit Facility”). In May 2025, the Company extended the term of the facility through July 15, 2026. In June 2026, the Company extended the terms of the facility through July 15, 2027. Revolving loans borrowed by the Company under the $50 Million Credit Facility may be used for general corporate purposes and carry a per annum interest rate of 1.25% plus SOFR. Letters of Credit issued under the $50 Million

19

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

Credit Facility have a one-year term and incur fees of 1.25% per annum on the amount of Letters of Credit outstanding. Letters of Credit require the pledge of cash collateral by the Company equal to 105.0% of the Letter of Credit exposure.

Concurrent with entry into the $50 Million Credit Facility, as required by the agreement, the Company pledged as security $50.0 million in cash collateral held in a control account maintained by the lender. The control account earns interest at a variable rate and is included in Restricted cash on the Condensed Consolidated Balance Sheets. As of June 30, 2026, the variable rate on the control account was approximately 3.4% per annum.

For the three months ended June 30, 2026 and 2025, the Company recognized $0.2 million and $0.3 million, respectively, and for the six months ended June 30, 2026 and 2025, $0.8 million and $0.3 million, respectively, of interest expense.

The following is a summary of the revolving line of credit under the $50 Million Credit Facility as of June 30, 2026:

June 30, 

2026

Total revolving credit facility

$

50,000

Revolving loans:

Borrowings outstanding at end of period

$

34,272

Weighted average daily borrowings for the period ended

$

34,272

Maximum daily borrowings for the period ended

$

34,272

Weighted average interest rate for the period ended

4.9

%

Interest rate at end of the period

 

4.9

%

Letters of credit issued

$

15,171

Total available capacity

$

557

$20 Million Credit Facility

In August 2024, the Company entered into a two-year $20.0 million Revolving Credit Facility (the “$20 Million Credit Facility”). Revolving loans borrowed by the Company under the $20 Million Credit Facility may be used for general corporate purposes and carry a per annum interest rate of 1.60% plus the SOFR. Letters of Credit issued under the $20 Million Credit Facility have a one-year term and incur fees of 1.5% per annum on the amount of Letters of Credit outstanding. Letters of Credit require the pledge of cash collateral by the Company equal to 105.0% of the Letter of Credit exposure.

Concurrent with entry into the $20 Million Credit Facility, as required by the agreement, the Company pledged as security $20.0 million in cash collateral held in a control account maintained by the lender. The control account earns interest at a variable rate and is included in Restricted cash on the Condensed Consolidated Balance Sheets. As of June 30, 2026, the variable rate on the control account was approximately 3.0% per annum.

As of June 30, 2026, the Company had no letters of credit issued under the $20 Million Credit Facility.

For the three months ended June 30, 2026 and 2025, the Company recognized $0.3 million and $0.3 million, respectively, and for the six months ended June 30, 2026 and 2025, $0.5 million and $0.3 million, respectively, of interest expense.

The following is a summary of borrowings under the $20 Million Credit Facility as of June 30, 2026:

June 30, 

2026

Total revolving credit facility

$

20,000

Borrowings outstanding at end of period

$

20,000

Weighted average daily borrowings for the period ended

$

20,000

Maximum daily borrowings for the period ended

$

20,000

Weighted average interest rate for the period ended

5.3

%

Interest rate at end of the period

 

5.3

%

20

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

$200 Million Credit Facility

On April 22, 2025, the Company entered into a $100.0 million credit facility with Coinbase Credit, Inc., which was subsequently upsized on May 20, 2025 to a total commitment of $200.0 million (the “$200 Million Credit Facility”). Under the $200 Million Credit Facility, a multiple drawdown term loan facility in an aggregate principal amount of up to $200.0 million was made available to the Company. The Company has fully drawn against the $200 Million Credit Facility and intends to use the proceeds for key strategic initiatives and general corporate purposes, including capital expenditures related to data center development.

Prior to April 22, 2026, all amounts borrowed under the $200 Million Credit Facility bore interest at an annual rate equal to (a) the greater of (i) the federal funds rate on the date of the applicable borrowing, and (ii) 3.25%, plus (b) 4.50%. The $200 Million Credit Facility had a term of one year following commencement, with the Company having the ability to request a one-year extension, subject to consent by Coinbase Credit Inc. Amounts borrowed under the $200 Million Credit Facility, including amendments thereto, are secured by a portion of the Company’s total bitcoin holdings. The pledged collateral under the $200 Million Credit Facility may not be used by the lender to secure any other loan account.

On April 21, 2026, the Company entered into the Second Amended and Restated Credit Agreement with Coinbase Credit, Inc., which extended the maturity of the $200 Million Credit Facility to April 20, 2027, and changed the interest incurred to a fixed annual rate equal to 6.15%.

As of June 30, 2026, 5,821 of the Company’s bitcoin were pledged as collateral to secure the $200 Million Credit Facility. The fair value of the pledged bitcoin is recognized in Restricted bitcoin on the Condensed Consolidated Balance Sheets.

For the three and six months ended June 30, 2026, the Company recognized interest expense on the $200 Million Credit Facility of $3.4 million and $8.1 million, respectively, all of which was capitalized into Construction in progress within Property and equipment, net on the Condensed Consolidated Balance Sheets.

For the three and six months ended June 30, 2025, $3.1 million of interest expense was incurred and no incurred interest was capitalized. As of June 30, 2025, the variable interest rate was 9.0%.

Note Payable

The Company has a note payable with a fixed rate of 8.81%. The note matures in December 2035, with annual principal and accrued interest payments due beginning on December 31, 2024.

The following table presents the Company’s future note payable principal payments due as of June 30, 2026:

Remainder of 2026

$

343

2027

 

373

2028

 

405

2029

 

443

2030

 

482

Thereafter

 

2,963

Total

$

5,009

As of June 30, 2026, the note payable had an estimated fair value of approximately $4.9 million. The fair value measurement is based on significant inputs not observable in the market and thus represents a Level 3 measurement on the fair value hierarchy. The

21

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

significant assumptions used to estimate fair value of the note as of June 30, 2026, primarily consisted of a discount rate range of 9.4% to 11.3%, which reflected the issuance date spread premium over the selected yield for the remaining time to maturity.

Note 12. Leases as Lessee

Operating Leases

As of June 30, 2026, the Company had operating leases primarily for its various corporate offices, the manufacturing facilities of ESS Metron and E4A Solutions, and the Kentucky Facility, all of which expire on various dates through July 2035.

As of June 30, 2026 and December 31, 2025, operating lease right-of-use assets were $35.4 million and $26.7 million, respectively, and operating lease liabilities were $34.8 million and $26.0 million, respectively.

Finance Lease

In August 2025, the Company entered into a lease for equipment located at the Kentucky Facility. The lease expires on December 31, 2029, at which time title to the leased equipment will be transferred to the Company.

As of June 30, 2026, the finance lease right-of-use asset was $3.3 million and there was no remaining lease liability.

The following table presents the components of the Company’s lease expense. Ground and facilities lease expenses are included in Cost of revenue, office lease expenses are included in Selling, general, and administrative, and finance leases are amortized into Depreciation and amortization on the Condensed Consolidated Statements of Operations:

  ​ ​ ​

Three Months Ended

  ​ ​ ​

Six Months Ended

  ​ ​ ​

June 30, 

  ​ ​ ​

June 30, 

2026

  ​ ​ ​

2025

2026

  ​ ​ ​

2025

Finance lease cost:

Amortization of right-of-use assets

$

90

$

$

180

$

Operating lease cost

3,261

1,917

5,991

3,499

Variable lease cost

 

432

 

102

 

606

 

199

Total lease expense

$

3,783

$

2,019

$

6,777

$

3,698

The following table presents supplemental lease information:

Three Months Ended

Six Months Ended

June 30, 

June 30, 

2026

2025

2026

2025

Operating leases net operating cash outflows

$

3,428

$

2,779

$

5,910

$

4,038

Right-of-use assets exchanged for new operating lease liabilities

$

2,566

$

$

13,564

$

5,962

Weighted-average remaining lease term – operating leases

 

3.9

 

5.5

 

3.9

 

5.5

Weighted-average discount rate – operating leases

 

6.6

%  

 

7.3

%  

 

6.6

%  

 

7.3

%

The following table presents the Company’s future minimum operating lease payments as of June 30, 2026:

Remainder of 2026

$

6,336

2027

 

10,816

2028

9,093

2029

 

6,751

2030

 

2,835

Thereafter

 

3,462

Total undiscounted lease payments

 

39,293

Less present value discount

 

(4,539)

Present value of lease liabilities

$

34,754

 

22

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

Note 13. Stockholders’ Equity

The Company is authorized to issue up to 680,000,000 shares of common stock, without any par value per share.

Each holder of common stock is entitled to one vote for each share held of record on all matters to be voted on by such holders. Holders of common stock are entitled to receive dividends, if declared. Upon liquidation, dissolution, or winding-up, holders of common stock are entitled to share ratably in the net assets legally available for distribution after payment of all debts and other liabilities, subject to any preferential rights of the holders of preferred stock, if any.

During the six months ended June 30, 2026, the increase of approximately 6.4 million shares of common stock outstanding was attributable to the awarding of approximately 8.2 million restricted stock awards (“RSAs”) and the issuance of less than 0.1 million common shares in settlement of an equal number of fully vested restricted stock units (“RSUs”), net of approximately 0.2 million of shares with a fair value of approximately $2.5 million to cover taxes related to the settlement of such vested RSAs, as permitted by the 2019 Equity Incentive Plan, as amended (the “2019 Equity Incentive Plan”). These increases were partially offset by the forfeiture of approximately 1.6 million RSAs.

Subsequent Stock-Based Compensation Activity

During July 2026, approximately 16.5 million RSAs vested and the Company issued approximately 1.4 million common shares in settlement of an equal number of fully vested RSUs, net of approximately 4.1 million shares to cover taxes related to the settlement of such vested RSAs, as permitted by the 2019 Equity Incentive Plan.

At-the-Market Equity (“ATM”) Program

In December 2025, the Company established the 2025 ATM program, under which it could offer and sell up to $500.0 million in shares of the Company’s common stock (the “2025 ATM Program”).

During the six months ended June 30, 2026, no shares were sold under the 2025 ATM Program, and as of June 30, 2026, all $500.0 million in shares of the Company’s common stock were available for sale under the 2025 ATM Program.

Note 14. Stock-Based Compensation

The 2019 Equity Incentive Plan authorizes the granting of stock-based compensation awards to directors, officers, employees, and certain consultants of the Company in the form of RSAs, RSUs, or stock options, all of which settle in shares of the Company’s common stock upon vesting.

In June 2026, the Company’s stockholders approved the Seventh Amendment to the 2019 Equity Incentive Plan, which increased the shares of common stock reserved for issuance by 15.0 million shares.

As of June 30, 2026, the Company had 19,709,910 shares of common stock reserved for issuance under the 2019 Equity Incentive Plan.

23

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

The following table presents the Company’s stock-based compensation expense by category:

Three Months Ended

Six Months Ended

June 30, 

June 30, 

  ​ ​ ​

2026

  ​ ​ ​

2025

  ​ ​ ​

2026

  ​ ​ ​

2025

Performance-based stock awards and units

$

30,178

$

25,766

$

60,504

$

51,312

Service-based stock awards and units

6,669

4,233

15,133

8,263

Stock options

(1,265)

121

(889)

121

Total stock-based compensation, net of amounts capitalized

$

35,582

$

30,120

$

74,748

$

59,696

Capitalized stock-based compensation

74

369

Total stock-based compensation

$

35,656

$

30,120

$

75,117

$

59,696

Stock-based compensation expense is recognized in Selling, general, and administrative on the Condensed Consolidated Statements of Operations. Capitalized stock-based compensation is recognized in Construction in progress within Property and equipment, net on the Condensed Consolidated Balance Sheets.

Performance-Based Awards and Units

Performance-based RSAs and RSUs are eligible to vest either over a three-year performance period based on a market driven comparison of the Company’s total shareholder return (“TSR”) and the performance of the Russell 3000 Index (the “Index”), or annually based on the achievement of certain Company determined performance milestones.

The following table presents a summary of the activity of the performance-based RSAs:

Weighted Average

Grant-Date

Per Share

  ​ ​ ​

Number of Shares

  ​ ​ ​

Fair Value

Balance as of January 1, 2026

21,130,659

$

12.68

Granted

5,398,095

$

9.50

Vested

$

Forfeited

(748,173)

$

8.71

Balance as of June 30, 2026

25,780,581

$

12.13

As of June 30, 2026, there was approximately $62.3 million of unrecognized compensation cost related to the performance-based RSAs, which is expected to be recognized over a remaining weighted-average vesting period of approximately 0.8 years.

The following table presents a summary of the activity of the performance-based RSUs:

Weighted Average

Grant-Date

Per Share

  ​ ​ ​

Number of Units

  ​ ​ ​

Fair Value

Balance as of January 1, 2026

1,769,038

$

12.55

Granted

15,784

$

8.96

Vested

$

Forfeited

$

Balance as of June 30, 2026

1,784,822

$

12.52

As of June 30, 2026, there was approximately $1.8 million of unrecognized compensation cost related to the performance-based RSUs, which is expected to be recognized over a remaining weighted-average vesting period of approximately 0.4 years.

24

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

Service-Based Awards and Units

Service-based RSAs and RSUs vest over one, two, and three-year service periods.

The following table presents a summary of the activity of the service-based RSAs:

Weighted Average

Grant-Date

Per Share

  ​ ​ ​

Number of Shares

  ​ ​ ​

Fair Value

Balance as of January 1, 2026

3,011,220

$

10.97

Granted

2,783,253

$

12.92

Vested

(471,791)

$

10.85

Forfeited

(820,577)

$

10.12

Balance as of June 30, 2026

 

4,502,105

$

12.34

As of June 30, 2026, there was approximately $38.7 million of unrecognized compensation cost related to the service-based RSAs, which is expected to be recognized over a remaining weighted-average vesting period of approximately 1.9 years.

The following table presents a summary of the activity of the service-based RSUs:

Weighted Average

Grant-Date

Per Share

  ​ ​ ​

Number of Units

  ​ ​ ​

Fair Value

Balance as of January 1, 2026

230,411

$

12.00

Granted

165,745

$

12.67

Vested

(9,823)

$

12.65

Forfeited

$

Balance as of June 30, 2026

 

386,333

$

12.27

As of June 30, 2026, there was approximately $2.5 million of unrecognized compensation cost related to the service-based RSUs, which is expected to be recognized over a remaining weighted-average vesting period of approximately 1.3 years.

Stock Options

In June 2025, the Company granted approximately 1.2 million performance-based stock option awards under the 2019 Equity Incentive Plan. The stock option awards were eligible to vest in one-third increments upon meeting certain specified data center development-based EBITDA milestones through December 31, 2029, contingent upon continued service with the Company through each of the applicable milestones. Any vested options were exercisable through December 31, 2030.

The following table presents a summary of the activity of the stock options:

  ​ ​ ​

Number of Options

  ​ ​ ​

Exercise Price

Balance as of January 1, 2026

1,166,861

$

8.07

Granted

$

Vested

$

Forfeited

(1,166,861)

$

8.07

Balance as of June 30, 2026

 

$

In April 2026, all stock option awards were forfeited in connection with the mutual separation of Jonathan Gibbs, former Chief Data Center Officer, and the Company.

25

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

Note 15. Fair Value Measurements

Assets and Liabilities Measured at Fair Value on a Recurring Basis

The following tables present the Company’s assets and liabilities measured at fair value on a recurring basis:

Fair value measured as of June 30, 2026

Significant

Quoted prices in

Significant other

unobservable

Total carrying

active markets

observable inputs

inputs

  ​ ​ ​

value

  ​ ​ ​

(Level 1)

  ​ ​ ​

(Level 2)

  ​ ​ ​

(Level 3)

Bitcoin(a)

$

325,370

$

325,370

$

$

Restricted bitcoin(a)

$

340,668

$

340,668

$

$

Derivative assets(b)

$

88,465

$

$

$

88,465

Derivative liabilities(c)

$

631

$

$

$

631

Contingent consideration liabilities(d)

$

8,195

$

$

$

8,195

Fair value measured as of December 31, 2025

Significant

Quoted prices in

Significant other

unobservable

Total carrying

active markets

observable inputs

inputs

  ​ ​ ​

value

  ​ ​ ​

(Level 1)

  ​ ​ ​

(Level 2)

  ​ ​ ​

(Level 3)

Bitcoin(a)

$

1,227,462

$

1,227,462

$

$

Restricted bitcoin(a)

$

347,979

$

347,979

$

$

Derivative assets(b)

$

148,048

$

$

$

148,048

Contingent consideration liabilities(d)

$

8,195

$

$

$

8,195

(a)See Note 5. Bitcoin.
(b)See Note 8. Power Supply Agreements.
(c)See Note 8. Power Supply Agreements. Derivative liability balances are included in Accrued expenses and other current liabilities on the Condensed Consolidated Balance Sheets.
(d)See Note 16. Commitments and Contingencies.

There were no transfers of financial instruments between Level 1, Level 2, and Level 3 during the periods presented.

Assets and Liabilities Not Measured at Fair Value on a Recurring Basis

In addition to assets and liabilities that are measured at fair value on a recurring basis, the Company also measures certain assets and liabilities at fair value on a non-recurring basis. The Company’s non-financial assets, including goodwill, intangible assets, operating lease right-of-use assets, and property and equipment, are measured at fair value when there is an indication of impairment and the carrying amount exceeds the asset’s projected undiscounted cash flows. These assets are recorded at fair value only when an impairment charge is recognized.

As of June 30, 2026 and December 31, 2025, the fair values of cash and cash equivalents, restricted cash, accounts receivable, contract assets, prepaid expenses and other current assets, accounts payable, contract liabilities, and accrued expenses and other current liabilities approximated their carrying values because of the short-term nature of these instruments.

Note 16. Commitments and Contingencies

Commitments

Miners and mining equipment

Through June 30, 2026, the Company has paid approximately $821.3 million in total deposits and payments to MicroBT for the purchase of miners pursuant to the Master Agreement described in Note 6. Property and Equipment. As of June 30, 2026, the

26

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

Company has a remaining commitment of $7.7 million for the purchase of miners, which is expected to be paid through the fourth quarter of 2026.

Infrastructure

During 2024, the Company entered into agreements related to water supply infrastructure for the Corsicana Facility, resulting in total remaining commitments of approximately $2.6 million as of June 30, 2026. The Company expects to incur these costs through the remainder of 2026.

Contingent consideration liabilities

Block Mining

As part of the July 23, 2024 acquisition of Block Mining, a vertically integrated bitcoin mining company based in Kentucky, (the “Block Mining Acquisition”), the sellers are eligible to earn an additional $32.5 million in potential earn-out targets, payable in cash or stock, if certain milestones were reached by December 31, 2025, and both the Company and the sellers agree the milestones were reached. This contingent consideration had an acquisition date fair value of $26.1 million.

As of June 30, 2026, the Block Mining Acquisition contingent consideration had an estimated fair value of $6.2 million recognized on the Condensed Consolidated Balance Sheets in Contingent consideration liabilities, current portion. The fair value measurement as of June 30, 2026, is based on significant inputs not observable in the market and thus represents a Level 3 measurement on the fair value hierarchy. These inputs include management’s best estimate of both the probability and timing of achieving the milestones, a risk-free interest rate of approximately 5% based on the U.S. Treasury rate for the corresponding time periods and a credit spread of approximately 1% based on the median of Investment Grade High Yield Debt Instruments with a Standard & Poor’s BB credit rating. This credit rating was selected based on an independently-produced synthetic credit rating analysis.

As of December 31, 2025, the Block Mining Acquisition contingent consideration had an estimated fair value of $6.2 million.

There were no changes to the fair value of the Block Mining Acquisition contingent consideration during the three and six months ended June 30, 2026. Subsequent to June 30, 2026, the Company and the sellers agreed upon the milestones reached and the Company paid the $6.2 million that was accrued.

E4A Solutions

As part of the acquisition of E4A Solutions, a Texas-based provider of electrical engineering solutions (the “E4A Solutions Acquisition”), the sellers are eligible to earn potential earn-out targets based on E4A Solutions’ adjusted EBITDA, calculated as 2.65 times the amount the average adjusted EBITDA exceeds the established earn-out threshold during the two years ending December 31, 2026, payable in cash or Riot common stock at the Company’s discretion. This contingent consideration was recognized at the acquisition date fair value of $2.6 million.

As of June 30, 2026, the E4A Solutions Acquisition contingent consideration had an estimated fair value of $2.0 million. It is recognized at fair value on the Condensed Consolidated Balance Sheets in Contingent consideration liabilities, current portion. The fair value measurement as of June 30, 2026 is based on significant inputs not observable in the market and thus represents a Level 3 measurement on the fair value hierarchy. These inputs include management’s best estimate of both the probability and timing of achieving the milestones, risk-free rates ranging from 3.5% to 3.6% based on the U.S. Treasury rate for the corresponding time periods and a credit spread of approximately 1.9% based on the median of investment grade and high yield debt instruments with a Standard & Poor’s BB credit rating. This credit rating was selected based on an independently-produced synthetic credit rating analysis.

As of December 31, 2025, the E4A Solutions Acquisition contingent consideration had an estimated fair value of $2.0 million.

There were no changes to the fair value of the E4A Solutions Acquisition contingent consideration during the three and six months ended June 30, 2026.

27

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

For the three and six months ended June 30, 2025, the change in fair value of the Company’s total contingent consideration was a gain of $9.4 million and $17.6 million, respectively.

Contingencies

Legal Proceedings

The Company, and our subsidiaries, are subject at times to various claims, lawsuits and governmental proceedings relating to our business and transactions arising in the ordinary course of business. We cannot predict the final outcome of such proceedings. Where appropriate, we vigorously defend such claims, lawsuits, and proceedings. Some of these claims, lawsuits and proceedings seek damages, including direct, consequential, exemplary, and/or punitive damages, in amounts that could, if awarded, be significant. Certain of the claims, lawsuits and proceedings arising in the ordinary course of business are covered by our insurance program. We maintain property and various types of liability insurance in an effort to protect ourselves from such claims. In terms of any matters where there is no insurance coverage available to us, or where coverage is available and we maintain a retention or deductible associated with such insurance, we may establish an accrual for such loss, retention or deductible based on current available information. In accordance with accounting guidance, if it is probable that an asset has been impaired or a liability has been incurred as of the date of the financial statements, and the amount of loss is reasonably estimable, then an accrual for the cost to resolve or settle these claims is recorded by us on the Condensed Consolidated Balance Sheets. If it is reasonably possible that an asset may be impaired as of the date of the financial statements, then we disclose the range of possible loss. Costs related to the defense of such claims are recorded by us as they are incurred. Management, with the assistance of outside counsel, may from time to time adjust such accruals according to new developments in the matter, court rulings, or changes in the strategy affecting our defense of such matters. On the basis of current information, we do not believe there is a reasonable possibility that any material loss, if any, will result from any claims, lawsuits, and proceedings to which we are subject, either individually, or in the aggregate.

Intellectual Property Disputes

Malikie Innovations Patent Dispute

On December 12, 2025, Malikie Innovations Ltd. (“Malikie”) and Key Patent Innovations Ltd. (together with Malikie, the “Plaintiffs”) filed suit against the Company, Foundry Digital LLC, Fortitude Mining, LLC, and Cipher Mining Inc. (collectively, the “Defendants”) in the United States District Court for the Western District of Texas in the case captioned 7:25-CV-00567. The Plaintiffs allege that the Defendants’ bitcoin transactions infringe on certain patents owned by the Plaintiffs and seek injunctive relief and an unspecified amount of damages, including pre- and post-judgment interest. The Company has engaged counsel and is working with its counsel to evaluate and defend the Company from this infringement claim. The Company cannot reasonably predict the outcome of such ongoing litigation, or the magnitude of such outcome, at this time.

Green Revolution Cooling Patent Dispute

On March 22, 2024, Green Revolution Cooling, Inc. (“GRC”) filed a complaint against the Company in the Western District of Texas (Case No. 6:24-CV-152), for patent infringement. More specifically, GRC has alleged that the immersion cooling systems provided to the Company by third parties infringe GRC’s U.S. Patent Nos. 9,992,914 (the “’914 Patent”) and 10,123,463 (the “’463 Patent”). GRC sought monetary damages through the time of trial, in excess of $52.0 million. GRC also sought an injunction against using all products that allegedly infringe the ’914 Patent and the ’463 Patent, or in lieu of an injunction, an award of a compulsory post-trial royalty of $0.01 per kWh of power used by the immersion cooled buildings. On April 9, 2026, a jury was convened and on April 13, 2026, trial commenced in the Western District of Texas. On April 13, 2026, the Court granted a directed verdict of no infringement for the ’463 Patent, leaving only the ’914 Patent for the jury to decide liability and damages. On April 17, 2026, the jury returned a verdict in favor of the Company, finding that it did not infringe the ’914 Patent. Accordingly, neither the Court nor the jury assessed any damages. On June 1, 2026, GRC filed a Motion for New Trial (the “Motion”) and on June 15, 2026, the Company filed its response. The Motion is currently pending in the Western District of Texas.

On June 3, 2026, GRC filed a new complaint for patent infringement against the Company, Riot Corsicana, LLC, and Whinstone (Case No. 3:26-cv-01842) in the United States District Court for the Northern District of Texas alleging infringement of U.S. Patent No. 12,513,853 by the Company’s immersion cooling systems. The Company has engaged counsel and is working with counsel to evaluate and defend the Company against this infringement claim. The Company cannot reasonably predict the outcome of such ongoing litigation, or the magnitude of such outcome, at this time.

28

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

Legacy Hosting Customer Disputes 

 

SBI

 

On April 5, 2023, SBI Crypto Co., Ltd. (“SBI”) filed a complaint in the United States District Court for the Western District of Texas (Case No. 6:23-cv-252), which it later amended, against Whinstone alleging breach of contract, fraud, and negligent bailment claims related to a colocation services agreement between Whinstone and SBI that was terminated in 2021. On July 21, 2023, Whinstone filed a motion to dismiss the amended complaint, which was denied on October 25, 2023. On November 25, 2024, Whinstone asserted counterclaims for breach of contract and fraudulent inducement. SBI attempted to update its alleged damages to over $350.0 million in purported lost profits through an updated expert report which the court struck. Notwithstanding, SBI attempted to recover over $175.0 million in purported lost profits (a substantial amount of which is attributable to appreciation in Bitcoin prices), which had been previously disclosed, and more than $50.0 million in equipment replacement cost, plus exemplary damages, reasonable attorneys’ fees, costs, expenses, and pre- and post-judgment interest. Whinstone believed many of the claims were barred or waived, and that all of SBI’s claims substantively lack merit, and Whinstone vigorously contested the same, as appropriate. On February 2, 2026, the court granted the Company’s motion for summary judgment in part, disallowing the use of appreciated Bitcoin prices in SBI’s damages model. On February 9, 2026, trial commenced before Magistrate Gilliland in the Western District of Texas. On February 16, 2026, the Company and SBI verbally agreed to a global settlement of all existing or future claims between the parties (the “SBI Settlement”). In consideration for the SBI Settlement, the Company agreed to pay SBI a total sum of $20.0 million in cash. On April 17, 2026, the court granted the Company and SBI’s joint motion, which dismissed all claims with prejudice.

GMO 

On June 13, 2022, GMO Gamecenter USA, Inc. and its parent, GMO Internet Group, Inc., (collectively, “GMO”) filed a complaint against Whinstone alleging breach of a colocation services agreement between GMO and Whinstone, which has since been terminated, seeking damages in excess of $150.0 million for lost profit and profit sharing payments GMO alleges it was owed from Whinstone. The case is pending in the United States District Court for the Southern District of New York (Case No. 1:22-cv-05974-JPC). Whinstone has responded to GMO’s claims and raised counterclaims of its own, alleging GMO itself breached the colocation services agreement, seeking a declaratory judgment and damages in excess of $25.0 million. On October 19, 2023, GMO filed its fourth amended complaint claiming an additional $496.0 million in damages, for loss of future profits and future profit sharing payments GMO alleges would have been received through the term of the agreement, based on Whinstone’s allegedly wrongful termination of the colocation services agreement as of June 29, 2023. On August 26, 2025, GMO filed its fifth amended complaint including the Company as a defendant. On September 29, 2025, the Company filed a motion to dismiss the fifth amended complaint, and that motion is currently pending before the court. On January 8, 2026, Whinstone filed a motion for summary judgment seeking dismissal of almost all claims against it, and GMO filed a motion for partial summary judgment on certain issues. Briefing on these motions is fully submitted and pending decision by the court. By order dated May 13, 2026, the court scheduled trial for January 5, 2027. The Company cannot reasonably predict the outcome of such ongoing litigation, or the magnitude of such an outcome, at this time.

29

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

Note 17. Earnings Per Share (“EPS”)

The following table presents potentially dilutive securities that were included in the computation of diluted net income (loss) per share:

Three Months Ended

Six Months Ended

June 30, 

June 30, 

  ​ ​ ​

2026

  ​ ​ ​

2025

  ​ ​ ​

2026

  ​ ​ ​

2025

Numerator:

Net income (loss)

$

(237,170)

$

219,454

$

(737,647)

$

(76,913)

Interest incurred on the 2030 Notes, net of income taxes

2,189

Numerator for diluted EPS

$

(237,170)

$

221,643

$

(737,647)

$

(76,913)

Denominator:

Denominator for basic EPS - weighted average shares outstanding

347,695,985

336,278,380

347,660,313

332,912,120

Effect of dilutive securities:

Unvested RSAs

5,881,278

Unvested RSUs

529,579

2030 Notes

39,988,127

Dilutive potential common shares

46,398,984

Denominator for diluted EPS - adjusted weighted average shares outstanding

347,695,985

382,677,364

347,660,313

332,912,120

Basic EPS

$

(0.68)

$

0.65

$

(2.12)

$

(0.23)

Diluted EPS

$

(0.68)

$

0.58

$

(2.12)

$

(0.23)

The following table presents potentially dilutive securities that were not included in the computation of diluted net income (loss) per share as their inclusion would have been anti-dilutive:

Three Months Ended

Six Months Ended

June 30, 

June 30, 

  ​ ​ ​

2026

  ​ ​ ​

2025

  ​ ​ ​

2026

  ​ ​ ​

2025

Warrants to purchase common stock

63,000

63,000

63,000

63,000

Unvested RSAs(a)

30,282,686

30,282,686

22,846,989

Unvested RSUs

2,171,155

2,171,155

2,114,812

Stock options

1,166,861

1,166,861

2030 Notes

39,988,127

39,988,127

Total

72,504,968

1,229,861

72,504,968

26,191,662

(a)Unvested restricted stock awards are included in total common shares outstanding but are excluded from the calculation of basic earnings per share.

Note 18. Segment Information

The Company has three reportable segments: Bitcoin Mining, Data Center, and Engineering. The reportable segments are identified based on the types of services performed. No operating segments have been aggregated to form the reportable segments.

Gross profit (loss) is the segment performance measure the CODM uses to assess the Company’s reportable segments and is calculated before the elimination of intersegment profits. The CODM is the Company’s CEO. The CODM uses segment gross profit (loss) to assess the performance of, manage the operations of, and allocate capital and operational resources to the

30

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

Company’s three reportable segments, and as part of the budgeting process and review of budget-to-actual variances for capital allocation decisions.

The $97.2 million of goodwill from the Block Mining Acquisition is allocated to the Bitcoin Mining segment and $25.3 million of goodwill from the E4A Solutions Acquisition is allocated to the Engineering segment. The Company does not regularly provide segment assets to its CODM, and, therefore, does not separately disclose the total assets of its reportable operating segments.

The Bitcoin Mining segment generates revenue from the bitcoin earned through its Bitcoin Mining activities. The Data Center segment generates revenue from developing and leasing data center space and power capacity to third-party customers. The Engineering segment generates revenue through customer contracts for custom-engineered electrical products and services.

All revenue and cost of revenue from intersegment transactions have been eliminated in the Condensed Consolidated Statements of Operations.

The following tables present segment revenue and segment gross profit (loss), including the significant expense items reviewed by the CODM:

Three Months Ended June 30, 2026

Bitcoin Mining

Data Center

Engineering

Total

Revenue from external customers

$

113,736

$

23,213

$

37,286

$

174,235

Intersegment revenue

8,884

8,884

Segment revenue

113,736

23,213

46,170

183,119

Reconciliation of revenue

Other revenue(a)

Elimination of intersegment revenue

(8,884)

Total consolidated revenue

174,235

Less:

Power

73,499

354

73,853

Compensation

5,299

390

5,689

Insurance on miners

1,076

1,076

Water and property tax

6,652

8

6,660

Tenant fit-out costs

15,925

15,925

Materials

16,572

16,572

Labor

3,002

3,002

Other segment items(b)

2,738

23

14,122

16,883

Segment gross profit (loss)

$

24,472

$

6,513

$

12,474

$

43,459

31

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

Three Months Ended June 30, 2025 (c)

Bitcoin Mining

Engineering

Total

Revenue from external customers

$

140,889

$

10,576

$

151,465

Intersegment revenue

5,010

5,010

Segment revenue

140,889

15,586

156,475

Reconciliation of revenue

Other revenue(a)

1,523

Elimination of intersegment revenue

(5,010)

Total consolidated revenue

152,988

Less:

Power

62,170

62,170

Compensation

4,686

4,686

Insurance on miners

1,462

1,462

Ground rent and related water and property tax

5,719

5,719

Materials

2,165

2,165

Labor

805

805

Other segment items(b)

4,139

6,888

11,026

Segment gross profit (loss)

$

62,714

$

5,728

$

68,442

Six Months Ended June 30, 2026

Bitcoin Mining

Data Center

Engineering

Total

Revenue from external customers

$

225,631

$

56,363

$

59,460

$

341,454

Intersegment revenue

26,622

26,622

Segment revenue

225,631

56,363

86,082

368,076

Reconciliation of revenue

Other revenue(a)

Elimination of intersegment revenue

(26,622)

Total consolidated revenue

341,454

Less:

Power

145,816

381

146,197

Compensation

10,344

448

10,792

Insurance on miners

2,538

2,538

Water and property tax

12,308

8

12,316

Tenant fit-out costs

46,613

46,613

Materials

38,097

38,097

Labor

5,767

5,767

Other segment items(b)

5,020

23

22,297

27,340

Segment gross profit (loss)

$

49,605

$

8,890

$

19,921

$

78,416

32

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

Six Months Ended June 30, 2025 (c)

Bitcoin Mining

Engineering

Total

Revenue from external customers

$

283,748

$

24,496

$

308,244

Intersegment revenue

11,334

11,334

Segment revenue

283,748

35,830

319,578

Reconciliation of revenue

Other revenue(a)

6,131

Elimination of intersegment revenue

(11,334)

Total consolidated revenue

314,375

Less:

Power

123,999

123,999

Compensation

9,131

9,131

Insurance on miners

2,924

2,924

Ground rent and related water and property tax

7,862

7,862

Materials

5,811

5,811

Labor

1,967

1,967

Other segment items(b)

9,077

13,886

22,963

Segment gross profit (loss)

$

130,755

$

14,166

$

144,921

(a)Other revenue is primarily attributable to legacy Data Center Hosting bitcoin mining revenue and is therefore not included in the total for segment gross profit (loss).
(b)For each reportable segment, the other segment items category primarily consists of:

Bitcoin Mining: Bitcoin miner and network repair and maintenance costs.

Engineering: Manufacturing overhead costs.

(c)The Company recognized its new Data Center operations as a reportable segment for the three and six months ended June 30, 2026. Accordingly, for the three and six months ended June 30, 2025, the Data Center segment is omitted from the table because there was no segment revenue or segment gross profit (loss).

33

Table of Contents

Riot Platforms, Inc.

Notes to Condensed Consolidated Financial Statements

(Unaudited)

The following table presents the reconciliation of segment gross profit (loss) to Net income (loss) before taxes:

Three Months Ended June 30, 

Six Months Ended June 30, 

  ​ ​ ​

2026

  ​ ​ ​

2025

  ​ ​ ​

2026

  ​ ​ ​

2025

Segment gross profit (loss)

$

43,459

$

68,442

$

78,416

$

144,921

Reconciling items:

 

  ​

 

  ​

 

  ​

 

  ​

Other profit (loss) (a)

(1,483)

(5,840)

Elimination of intersegment profits

 

(2,218)

 

(5,010)

 

(5,632)

 

(11,334)

Acquisition-related costs

 

 

(111)

 

 

(187)

Selling, general, and administrative

 

(81,999)

 

(75,902)

 

(158,179)

 

(147,350)

Depreciation and amortization

 

(97,784)

 

(83,197)

 

(195,518)

 

(161,123)

Change in fair value of bitcoin

(74,607)

470,812

(401,276)

262,772

Change in fair value of derivatives

 

(8,362)

 

(42,747)

 

(60,214)

 

(853)

Power curtailment credits

10,054

8,313

31,077

16,114

Change in fair value of contingent consideration

 

 

9,390

 

 

17,642

(Loss) gain on sale/exchange of equipment

(350)

(479)

Casualty-related (charges) recoveries, net

 

(3)

 

119

 

(3)

 

119

Interest income

 

3,623

 

3,334

 

5,936

 

6,731

Interest expense

(2,687)

 

(6,093)

(5,305)

(8,401)

Loss on equity method investment - marketable securities

 

 

6,143

 

 

(57,095)

Loss on contract settlement

 

(158,137)

 

 

(158,137)

Gain on acquisition post-close dispute settlement

26,007

26,007

Impairment of property and equipment

(27,972)

(27,972)

Other income (expense)

 

1,221

 

244

 

1,209

 

337

Net income (loss) before taxes

$

(237,275)

$

219,774

$

(737,461)

$

(76,156)

(a)Other profit (loss) is primarily attributable to legacy Data Center Hosting bitcoin mining activity for the three and six months ended June 30, 2025, and is therefore not included in the total for segment gross profit (loss).

Concentrations

For the three and six months ended June 30, 2026, Bitcoin Mining revenue generated as a result of the Company’s participation in a mining pool and Data Center revenue generated by the Company’s AMD lease each contributed more than 10% of the Company’s total consolidated revenue.

For the three and six months ended June 30, 2025, Bitcoin Mining revenue generated as a result of the Company’s participation in a mining pool contributed more than 10% of the Company’s total consolidated revenue.

For the three and six months ended June 30, 2026 and 2025, Bitcoin Mining power was primarily obtained from ERCOT.

For the three and six months ended June 30, 2026, Data Center power was entirely obtained from ERCOT.  

34

Table of Contents

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The following Management’s Discussion and Analysis of Financial Condition and Results of Operations (“MD&A”) provides information to assist readers in understanding our results of operations and financial condition. This MD&A should be read in conjunction with the Notes and other financial information included elsewhere in this Quarterly Report, and our audited consolidated financial statements included in our Annual Report on Form 10-K for the year ended December 31, 2025.

Unless otherwise indicated, amounts are stated in thousands of U.S. dollars except for: share, per share, per MWh, MW, GW, and miner amounts; bitcoin quantities, prices, and hash rate; cost to mine one bitcoin; and production value of one bitcoin mined.

Our MD&A is primarily organized as follows:

Business Overview and Trends. Highlights of events that impacted our financial position and results of operations.
Results of Operations. Analysis of our financial results comparing the three and six months ended June 30, 2026 and 2025.
Liquidity and Capital Resources. Analysis of changes in our balance sheets and cash flows and discussion of our financial condition, including potential sources of liquidity, material cash requirements, and their general purpose.
Critical Accounting Policies and Estimates. Accounting policies and estimates that we believe are important to understanding the assumptions and judgments underlying our reported financial results.

Forward-Looking Statements

This MD&A includes forward-looking statements based on current expectations that involve risks and uncertainties, such as our plans, objectives, expectations, and intentions. Actual results and the timing of events may differ materially from those anticipated in these forward-looking statements as a result of various factors. See “Cautionary Note Regarding Forward-Looking Statements” and “Risk Factors” for a discussion of factors that may cause actual results to differ materially – and potentially adversely – from the results described in or implied by the forward-looking statements contained in this MD&A and elsewhere in this Quarterly Report.

Business Overview and Trends

General

We are a vertically integrated digital infrastructure company principally engaged in developing and optimizing our large-scale power assets. Our business strategy centers on enhancing our electrical infrastructure and deploying it across two complementary platforms: (i) bitcoin mining and (ii) scalable data center solutions designed to support non-mining workloads. By leveraging our energy portfolio, engineering capabilities, and operational footprint, we aim to capitalize on both the long-term potential of bitcoin and the accelerating demand for power-intensive compute.

We operate in three reportable business segments: Bitcoin Mining, Data Center, and Engineering.

We own and manage multiple large-scale data center facilities in Texas and Kentucky that provide mission-critical power and infrastructure for our Bitcoin Mining at our Facilities, and non-mining Data Center operations at our Rockdale Facility. Our Rockdale Facility in Texas currently provides up to approximately 700 MW of developed capacity for Bitcoin Mining and Data Center leasing and is among the largest digital infrastructure campuses in North America, as measured by developed capacity. We have completed construction of approximately 400 MW of developed capacity at our second large-scale Texas development, the Corsicana Facility. We expect the Corsicana Facility to reach approximately 1 GW of developed capacity available for Bitcoin Mining and other high-density compute workloads upon full build-out. The Kentucky Facility currently provides approximately 192 MW of developed capacity.

Our industry remains highly competitive and continues to evolve alongside broader growth in digital assets and high-performance compute. With our scale, integrated power strategy, and engineering foundation, we believe we are well positioned to participate in the rapidly converging markets for Bitcoin Mining, AI, HPC, and modern data center infrastructure.

35

Table of Contents

Data Center Development

In 2025, we began leveraging our core competencies in power optimization, strategic land acquisition, engineering design, and construction execution to pursue opportunities to develop and monetize portions of our existing facilities and power pipeline through data center leasing services. We strengthened our execution capacity by recruiting critical talent and establishing a scalable data center platform to support data center development at the Corsicana Facility. We have completed our basis of design for our standard data center build and have initiated development of our first core & shell at the Corsicana Facility.

In January 2026, we announced the execution of the AMD Lease to provide 25 MW of critical IT load capacity at our Rockdale Facility. The AMD Lease has an initial term of ten years and provides three successive five-year term renewal options at the lessee’s discretion. The AMD Lease included an expansion option for an additional 75 MW of critical IT load capacity and a right of first refusal for an additional 100 MW.

In April 2026, we announced AMD’s exercise of a portion of the existing expansion option set forth in the AMD Lease, to provide an additional deployment of 25 MW of critical IT load capacity, which was pursuant to the AMD Lease Amendment. Under the AMD Lease Amendment, AMD holds a remaining balance of 50 MW of reserved critical IT load capacity under the existing expansion option. The AMD Lease Amendment also grants AMD a conditional, first-priority right to lease up to an additional 100 MW of critical IT load capacity, exercisable in increments of not less than 50 MW. If both the remaining 50 MW of reserved capacity under the existing expansion option and the additional 100 MW option are fully exercised, AMD’s total leased capacity at the Rockdale Facility would increase to 200 MW. This conditional, first-priority right replaces the right of first refusal for an additional 100 MW previously granted to AMD in the AMD Lease.

In August 2026, we announced the execution of the Tenant Lease to provide 191 MW of critical IT load capacity at the Rockdale Facility. The critical IT load capacity is anticipated to be delivered in phases in December 2027 and June 2028. The Tenant Lease has an initial term of 20 years and includes provisions for two successive five-year renewal terms at the option of the lessee. Immediate funding of long-lead procurement items will be provided by the $573 Million Credit Facility with Morgan Stanley.

Business Segments

Bitcoin Mining

During the six months ended June 30, 2026, we continued to deploy miners across all our Facilities, with the objective of improving our operational efficiency and performance. As of June 30, 2026, we had a total deployed hash rate capacity of 44.4 EH/s, as compared to 38.5 EH/s as of December 31, 2025, an increase of 15.3%.

During the six months ended June 30, 2026, we mined 3,060 bitcoin, reflecting an increase of 104 bitcoin compared to the 2,956 bitcoin mined during the six months ended June 30, 2025. The increase was primarily due to our increased average operating hash rate and significantly improved operational efficiency, partially offset by increases in the global network hash rate.

For the six months ended June 30, 2026 and 2025, Bitcoin Mining revenue was $225.6 million and $283.7 million, respectively. The decrease of $58.1 million was primarily due to lower bitcoin prices during the 2026 period, which averaged $73,736 per bitcoin, as compared to $95,991 per bitcoin for the 2025 period. The decrease was partially offset by a 19.5% increase in our average operating hash rate, which increased from 30.8 EH/s during the six months ended June 30, 2025, to 36.8 EH/s during the six months ended June 30, 2026, and the increase in bitcoin production.

Custodians

As bitcoin is a decentralized digital asset, we are not required to use a third-party custodian and may elect to self-custody our holdings. However, we believe that our private keys associated with our bitcoin are better safeguarded within the secure environment provided by custodians. Self-custody poses an increased risk to our private keys, and we may not have the same level of protection as that offered by custody providers who are well-versed in industry best practices for safeguarding digital assets from potential theft, loss, or destruction.

Our bitcoin custodian and brokerage services relationships are non-exclusive, and we may change our custodian and brokerage relationships at any time. We continually monitor our bitcoin assets held by our custodians. Our insurance providers do not have inspection rights associated with our bitcoin assets held in cold storage. For additional information regarding our relationships with our custodians, NYDIG Trust Company LLC and Coinbase, Inc., on behalf of itself and Coinbase Custody Trust Company, LLC,

36

Table of Contents

and, if applicable, Coinbase or Coinbase Custody International Ltd., and a description of our underlying agreements with them, see Part II, Item 7 “Management’s Discussion and Analysis of Financial Condition and Results of Operations” of our 2025 Annual Report.

Operating Metrics

The following table presents our key operating metrics:

Three Months Ended

Six Months Ended

June 30, 

June 30, 

  ​ ​ ​

2026

  ​ ​ ​

2025

  ​ ​ ​

2026

  ​ ​ ​

2025

Bitcoin Mining hash rate, average operating (EH/s)(1)

Rockdale Facility

14.5

13.1

14.3

13.1

Corsicana Facility

15.5

14.1

15.4

14.5

Kentucky Facility

7.2

4.5

7.1

3.2

Combined Bitcoin Mining hash rate, average operating

37.2

31.7

36.8

30.8

All-in power cost (cents/kilowatt-hour)(2)

Rockdale Facility

3.5

3.6

3.3

3.7

Corsicana Facility

3.2

3.5

2.9

3.5

Kentucky Facility

5.2

3.2

4.5

3.9

Combined all-in power cost

3.6

3.5

3.3

3.6

June 30, 

  ​ ​ ​

  ​ ​ ​

2026

  ​ ​ ​

2025

Bitcoin Mining hash rate, deployed (EH/s)(1)

Rockdale Facility

17.4

15.0

Corsicana Facility

16.6

15.7

Kentucky Facility

10.5

4.7

Combined Bitcoin Mining hash rate, deployed

44.4

35.4

Developed power capacity (MW)(3)

Rockdale Facility

700

700

Corsicana Facility

400

400

Kentucky Facility

192

65

Total power capacity

1,292

1,165

(1)Hash rate, deployed, represents the total potential hash rate of all our deployed miners as of the end of the period, whereas hash rate, average operating, represents the average total hash rate our deployed miners provided throughout the period. The difference between deployed hash rate and operating hash rate is attributable to down time of all or some of our miners for power curtailments, or repairs and maintenance of bitcoin miners or supporting infrastructure. The difference between deployed and operating hash rate is a key measure in determining the efficiency of our Bitcoin Mining operations.

(2)All-in power cost is the price we paid throughout the period for our power, net of power curtailments received. Power is overwhelmingly the largest marginal input cost in mining bitcoin and a significant contributor to profitability. Miners with a low cost of power are also able to profitably mine in a wider range of bitcoin prices.

(3)Developed power is the total amount of electricity our Facilities can utilize as of the end of the period.

37

Table of Contents

The following table presents our cost to mine one bitcoin (amounts in thousands, except Quantity of bitcoin mined and Production value of one bitcoin mined amounts):

Three Months Ended

Six Months Ended

June 30, 

June 30, 

  ​ ​ ​

2026

2025

2026

  ​ ​ ​

2025

Cost of power for self-mining operations

$

73,499

$

62,170

$

145,816

$

123,999

Other direct cost of revenue for self-mining operations(1)(2), excluding bitcoin miner depreciation

 

15,765

 

16,005

 

30,210

 

28,994

Cost of revenue for self-mining operations, excluding bitcoin miner depreciation

 

89,264

 

78,175

 

176,026

 

152,993

Less: power curtailment credits(3)

 

(10,054)

 

(8,313)

 

(31,077)

 

(16,114)

Cost of revenue for self-mining operations, net of power curtailment credits, excluding bitcoin miner depreciation

79,210

69,862

144,949

136,879

Bitcoin miner depreciation(4)(5)

64,622

60,252

140,708

117,314

Cost of revenue for self-mining operations, net of power curtailment credits, including bitcoin miner depreciation

$

143,832

$

130,114

$

285,657

$

254,193

 

  ​

 

  ​

 

  ​

 

  ​

Quantity of bitcoin mined

 

1,587

1,426

 

3,060

 

2,956

Production value of one bitcoin mined(6)

$

71,667

$

98,800

$

73,736

$

95,991

Cost to mine one bitcoin, excluding bitcoin miner depreciation

$

49,912

$

48,992

$

47,369

$

46,305

Cost to mine one bitcoin, excluding bitcoin miner depreciation, as a % of production value of one bitcoin mined

 

69.6

%  

49.6

%  

 

64.2

%  

 

48.2

%  

Cost to mine one bitcoin, including bitcoin miner depreciation

$

90,631

$

91,244

$

93,352

$

85,992

Cost to mine one bitcoin, including bitcoin miner depreciation, as a % of production value of one bitcoin mined

126.5

%  

92.4

%  

126.6

%  

89.6

%  

(1)Other direct cost of revenue includes compensation, insurance, repairs, and ground lease rent and related property tax.

(2)For the three months ended June 30, 2026 and 2025, we paid cash of $25.2 million and $71.3 million, respectively, and for the six months ended June 30, 2026 and 2025, we paid cash of $48.7 million and $92.3 million, respectively, in total deposits and payments for the purchase of miners. Costs to finance the purchase of miners were zero in all periods presented as the miners were paid for with cash from the Company’s cash balance. The seller did not provide any financing, nor did the Company borrow from a third-party to purchase the miners.

(3)Power curtailment credits are credited against our power invoices as a result of temporarily pausing our operations to participate in ERCOT’s Demand Response Service Programs. Our fixed-price power purchase contracts enable us to strategically curtail our mining operations and participate in these programs, which significantly lower our cost to mine bitcoin. These credits are recognized in Power curtailment credits on our Condensed Consolidated Statements of Operations, outside of cost of revenue, but significantly reduce our overall cost to mine bitcoin.

(4)We capitalize the acquisition cost of our miners and include these costs in Property and equipment, net on our Condensed Consolidated Balance Sheets. The miners are depreciated over an estimated useful life of three years, during which time, they are expected to contribute to the generation of bitcoin revenue. We do not consider depreciation expense in determining whether it is economical to operate our miners because depreciation is a non-cash expense and is not a variable operating cost that can be avoided even if we curtail operations temporarily. Depreciation expense incurred is disclosed for each respective period in the table above.

38

Table of Contents

(5)The following table presents the future depreciation expense of all of our bitcoin miners:

Remainder of 2026

$

133,593

2027

 

219,902

2028

 

99,312

2029

19,258

Total

$

472,065

(6)Computed as revenue recognized from bitcoin mined divided by the quantity of bitcoin mined during the same period.

During 2023 through 2026, we entered into purchase orders under the Master Agreement to acquire new miners from MicroBT. These purchase orders represented a total hash rate of 50.9 EH/s, with a total purchase price of approximately $795.2 million, subject to downward price adjustments as provided by the Master Agreement. These miners are primarily intended for deployment at the Corsicana Facility, which commenced operations in April 2024. Delivery of these miners began in 2023, and all miners under these purchase orders are expected to be received through the end of 2026, with deployment following on an ongoing basis. The Master Agreement provided us with three additional annual options to purchase miners, on the same or more favorable terms as the second purchase order executed under the Master Agreement.

For the three and six months ended June 30, 2026, Bitcoin Mining revenue was approximately $113.7 million and $225.6 million, respectively.

Summary of Riot’s Bitcoin Mining Results

The following tables present additional information about our Bitcoin Mining activities, including bitcoin production and sales of bitcoin mined:

Quantity

Amounts

Balance as of January 1, 2026

 

18,005

$

1,575,441

Revenue recognized from bitcoin mined

 

3,060

 

225,631

Change in bitcoin receivable

 

(2)

 

321

Proceeds from sale of bitcoin

 

(9,665)

 

(732,461)

Exchange of bitcoin for employee compensation

 

(18)

 

(1,618)

Change in fair value of bitcoin

 

 

(401,276)

Balance as of June 30, 2026

 

11,380

$

666,038

The following reconciles Bitcoin and Restricted bitcoin as of June 30, 2026 to the amounts above:

Bitcoin

5,559

$

325,370

Restricted bitcoin(a)

5,821

340,668

Total

11,380

$

666,038

Quantity

Amounts

Balance as of January 1, 2025

 

17,722

$

1,654,468

Revenue recognized from bitcoin mined

 

2,956

 

283,748

Change in bitcoin receivable

(272)

Proceeds from sale of bitcoin

 

(1,371)

 

(131,802)

Exchange of bitcoin for employee compensation

 

(34)

 

(3,334)

Change in fair value of bitcoin

 

 

262,772

Balance as of June 30, 2025

 

19,273

$

2,065,580

The following reconciles Bitcoin and Restricted bitcoin as of June 30, 2025 to the amounts above:

Bitcoin

15,973

$

1,711,908

Restricted bitcoin(a)

3,300

353,672

Total

19,273

$

2,065,580

(a)Restricted bitcoin is the Company’s bitcoin pledged as collateral for the $200 Million Credit Facility. See Note 11. Debt for more information.

39

Table of Contents

Data Center

Our Data Center business designs, develops, and operates large-scale data center projects designed to support the growing demand for high-density compute. This includes the lease of data center space and power capacity, which is generally paid monthly. Power costs are passed through to customers at cost. Additionally, we provide tenant fit-out services to our customers for the build-out of customer-specific equipment at cost plus a margin.

For the three and six months ended June 30, 2026, Data Center revenue was approximately $23.2 million and $56.4 million, respectively, reflecting leasing activity and associated tenant fit-out attributable to the AMD Lease.

Engineering

Our Engineering business designs and manufactures power-distribution equipment and engineered-to-order electrical products. These products support our vertical integration strategy by enabling the internal development of critical electrical equipment and engineering services necessary for developments at our Facilities. This integration helps mitigate execution and counterparty risk in ongoing and future expansion projects. The specialized talent employed in our Engineering business allows us to explore new methods to optimize and develop best-in-class Bitcoin Mining operations and has been instrumental in the development of our industrial-scale immersion-cooled Bitcoin Mining hardware. The vertical integration of our Engineering division gives us additional strength and security in developing and deploying our Data Center build-outs. Our Data Center business is able to leverage Engineering’s market specific expertise for best-in-class design as well as speed to market.

Our Engineering business also provides electrical distribution product design, manufacturing, and installation services primarily focused on large-scale industrial and governmental customers and serves a broad scope of clients across a wide range of markets including data center, power generation, utility, water, industrial, and alternative energy.

Engineering revenue is primarily derived from the sale of custom products built to customers’ specifications under fixed-price contracts with one identified performance obligation. Engineering revenue is recognized over time as performance creates or enhances an asset with no alternative use, and for which we have an enforceable right to receive compensation as defined under the contract.

In December 2024, we completed the E4A Solutions Acquisition. This acquisition strengthens our vertically integrated strategy by adding engineering expertise to service our existing and future electrical infrastructure as well as providing solutions and services to the rapidly growing market for electrical infrastructure.

For the three and six months ended June 30, 2026, Engineering revenue was approximately $37.3 million and $59.5 million, respectively.

Strategic Goals and Initiatives

Bitcoin Treasury Strategy

Our investment strategy regarding our bitcoin (“Bitcoin Treasury Strategy”) is designed to balance long-term value appreciation with operational flexibility and liquidity management. We selectively sell or leverage portions of our bitcoin holdings, and may continue to do so in the future, to fund operational needs, capital expenditures, and strategic initiatives, particularly when market conditions present opportunistic pricing above predetermined thresholds that we believe maximize shareholder value.

This approach enables us to realize value from our bitcoin holdings to support our liquidity profile and fund business growth. We believe this strategy enhances our operational stability, supports our liquidity profile, and provides the financial flexibility necessary to execute on our business plan and meet our capital allocation objectives.

Power Strategy

Long-term power contracts form the foundation of our power strategy. We utilize the Rockdale PPA, Corsicana PPA, and Kentucky PPA (together, the “PPAs”) at our Facilities in the following ways:

40

Table of Contents

Manual Curtailment

We power down operations and return power to the utility when prevailing market electricity prices offer the potential for us to realize power curtailment credits in excess of the Bitcoin Mining revenues we would have otherwise generated. We receive power credits for the difference in the market power price and our fixed power price. By capturing the spread between market power prices and our fixed-rate power contracts, we are able to maximize our overall profitability while supporting grid stability by reducing demand for power during periods of peak scarcity.

Ancillary Services

We competitively bid to sell ERCOT and MISO the option to control our electrical load during certain hours. ERCOT and MISO compensate us in the form of Demand Response Service Programs’ Credits, which are received whether or not we are called on to power down.

ERCOT’s 4CP Program

At the Rockdale Facility and the Corsicana Facility, we participate in ERCOT’s 4CP Program by voluntarily powering down operations during times of peak demand in summer months. Participation in this program provides substantial savings on transmission costs in the subsequent year’s power bills and contributes to reduced overall power costs.

The following table presents our power curtailment credits:

Three Months Ended

Six Months Ended

June 30, 

June 30, 

  ​ ​ ​

2026

  ​ ​ ​

2025

  ​ ​ ​

2026

  ​ ​ ​

2025

Manual curtailment power credits

$

7,361

$

6,646

$

28,293

$

13,676

Demand response power credits

2,693

1,667

2,784

2,438

Total power curtailment credits

$

10,054

$

8,313

$

31,077

$

16,114

The following graph presents the primary decision factors that guide our decision to curtail power usage or power down our mining operations, and when we might resume mining operations:

Graphic

41

Table of Contents

Challenges, Risks, and Industry Trends

Increased Competition and Global Network Hash Rate

The price of bitcoin reached new all-time highs in 2025, supported by continued institutional investment in the Bitcoin spot exchange-traded funds (“ETFs”), global adoption, and increased interest from both retail and sovereign investors, but fell in the first half of 2026 to prices last seen in 2024. Bitcoin spot ETFs remained a primary driver of institutional demand. These ETFs, as investment vehicles, provide investors with a broader way to gain exposure to bitcoin through more traditional financial markets. In March 2025, the United States established the United States Bitcoin Strategic Reserve, which currently holds the largest bitcoin reserve in the world, solidifying bitcoin as a mainstream financial asset and alternative source of value to fiat currency.

During 2023 and 2024, the bitcoin mining industry experienced record growth as the price of bitcoin increased from the lows experienced in early 2023. In 2025 and the first half of 2026, the industry continued to grow, though at a slower pace due to increased network difficulty during 2025 and more aggressive competition for efficient energy sources globally. The rising bitcoin price renewed opportunities to access capital markets to fund growth, leading to unprecedented expansion in mining operations, which resulted in a doubling of the size of provisioned hash calculation services on the network, as measured by total hash rate. Competition among mining companies continued to intensify in 2025, with top operators focusing on mergers, acquisitions, and direct power procurement contracts to secure stable energy pricing in the face of volatile market conditions.

We have observed that when the market price for bitcoin experiences sustained increases, new miners are introduced onto the bitcoin network, contributing to an increase in the global network hash rate. Our hash rate grew by approximately 15.3% from December 31, 2025 to June 30, 2026, and the number of bitcoin we mined during the same period increased, offsetting the increase in the global network hash rate as compared to the same period in 2025.

Accordingly, as the global network hash rate continues to rise, miners must scale their operations to maintain or improve their share of mining rewards. In response, we have made investments in electricity supply and distribution infrastructure and are focused on other strategic growth opportunities that enhance our long-term competitiveness. Further, we have adopted new and improved technology to increase both our mining power and efficiency, including our industrial-scale adoption of immersion cooling and our strategic acquisitions of large quantities of the latest powerful and efficient miners available.

Bitcoin Mining Industry Consolidation and Emergence of Data Center Alternative

The bitcoin mining industry is undergoing significant structural transformation. A combination of factors, including the 2024 halving event, record high network hash rates in 2025, rising mining difficulties, and constrained access to large-scale power resources, has led to increased consolidation across the industry. These dynamics have made efficient, large-scale mining operations increasingly capital-intensive and have prompted miners to seek new avenues for maximizing the value of their existing infrastructure. A notable emerging trend is the convergence of bitcoin mining operations with large-scale data center services, including those supporting AI/HPC workloads. As demand for data center infrastructure accelerates, driven by advances in machine learning, generative AI, and compute-intensive enterprise applications, access to reliable, low-cost power has become a critical constraint on the development of new data centers. Bitcoin mining companies that own and operate their facilities are increasingly repurposing or reallocating portions of their power and physical infrastructure to support data center applications. This shift is enabled by the similarities between the underlying facility requirements for bitcoin mining and data center workloads, including large electrical loads, advanced cooling systems, and high-density rack deployments.

As a result, the industry is experiencing an evolution in which mining operators with robust power portfolios are leveraging their existing assets to participate in the rapidly growing market for data center services. This trend reflects both the challenges facing the Bitcoin mining sector and the significant economic opportunities presented by the global expansion of compute-intensive digital infrastructure.

Volatile Transaction Fees

The bitcoin mining industry recently experienced an increase in transaction fees on the bitcoin network, alongside growing overall demand for bitcoin. While transaction fees remain inherently volatile, they are paid directly to miners and are representative of the public interest in transacting on the bitcoin network. These transaction fees, combined with the block subsidy issued by the bitcoin network, make up the total reward paid to miners upon solving a block.

42

Table of Contents

Vertical Integration

Since 2021, we have focused on a vertically integrated business model. We remain committed to building long-term stockholder value by taking strategic actions to further vertically integrate our business at the current Rockdale Facility, developing the Corsicana Facility, expanding the Kentucky Facility, and integrating our acquisitions, including the Kentucky Facility and E4A Solutions. Management believes that vertical integration will strengthen each of our business segments by providing increased capacity for our Bitcoin Mining operations, expanding opportunities for implementing our proprietary power strategy, and positioning us to capitalize on supply chain efficiencies and electrical engineering services through our Engineering segment. We continue to focus on deploying our efficient Bitcoin Mining fleet, at scale, while realizing the benefits of being an owner and operator of our Bitcoin Mining facilities.

Prior to the 2024 halving event, shifts in strategy by prominent bitcoin miners focused on implementing vertically-integrated business models by investing in infrastructure, and upgrading and expanding fleets at their own facilities rather than renting out space from a third-party data center. Vertical integration provides additional control over operational outcomes as well as better management of any input costs such as power and overhead fees. Flexibility, and the ability to manage expenses, becomes increasingly important as the amount of competition on the bitcoin network expands and the subsidy in bitcoin provided by the network contracts decreases.

We anticipate the bitcoin network will continue to see increased competition and consolidation in the bitcoin mining industry. Further, given our relative position and liquidity, we believe we are well positioned to benefit from such consolidation. We are continuously evaluating opportunities which we may decide to undertake as part of our strategic growth initiatives; however, we can offer no assurances that any strategic opportunities which we decide to undertake will be achieved on the schedule or within the budget we anticipate, if at all, and our business and financial results may change significantly as a result of such strategic growth.

Grid Curtailment

The Public Utility Commission of Texas (“PUCT”), ERCOT, and Oncor Electric Delivery Company LLC (“Oncor”) collectively oversee the regulatory, administrative, and delivery aspects of our power supply in Texas. In Kentucky, MISO oversees our power supply. As the bitcoin mining industry has expanded in recent years, regulatory scrutiny on bitcoin mining facilities and their energy consumption has intensified accordingly.

As Texas’s grid operator, ERCOT is responsible for monitoring and testing market participants, including our Bitcoin Mining facilities at the Rockdale Facility and the Corsicana Facility, to evaluate their impact on grid reliability. As part of this process, ERCOT may issue curtailment notices to reduce the power usage at our Texas operations. Our Facilities in Texas are subject to periodic testing and monitoring and have experienced power curtailments in response to instructions we receive from Oncor and ERCOT. Given the inherent uncertainty regarding the duration or extent of power curtailments and testing procedures, we are currently unable to reasonably estimate their potential impact on our operations. If we cannot secure adequate access to electrical power, we may be forced to reduce or shut down our operations, which would have a material adverse effect on our business, prospects, financial condition, and operating results.

Data Center Scrutiny and Regulation

Driven by the proliferation of energy-intensive applications such as bitcoin mining and HPC, demand for energy capacity continues to outpace supply. Data centers are increasingly scrutinized by federal, state, and local authorities due to concerns regarding energy consumption, land use, carbon emissions, water usage, environmental impacts, workforce, data-sovereignty considerations, and national-security-related issues. Regulators may impose new permitting requirements, energy-efficiency standards, carbon-reduction mandates, sustainability reporting rules, or operational restrictions specific to data centers, AI infrastructure, or high-density compute environments. Such regulations, particularly at the federal level or in the States of Texas and Kentucky, where our Facilities operate, could increase our capital expenditures, delay development timelines, limit expansion opportunities, or require costly modifications to existing infrastructure.

Tax abatement programs that have historically supported development, and specifically, data center development, are subject to increasing scrutiny as residents and policymakers reassess the associated economic benefits to their communities relative to perceived impacts on energy demand, utility costs, and natural resource consumption. In response, certain jurisdictions are becoming more selective in offering incentives or eliminating them altogether. Certain jurisdictions have implemented, or are considering implementing, temporary moratoriums or other restrictions on new data center development due to these concerns.

43

Table of Contents

See Part I, Item 1A. “Risk Factors” of the 2025 Annual Report for additional discussion regarding potential impacts that our competitive and evolving industry may have on our business.

Recent Events Affecting the Company

Global supply chain disruptions and inflationary pressures have, at times, resulted in delays to our miner delivery schedules, infrastructure development timelines, and the manufacturing and delivery schedules within our Engineering segment. These delays are primarily driven by constraints in the globalized supply chains for miners, specialized electrical distribution equipment, and construction materials. While we have effectively mitigated these delays, there can be no assurance that we will be successful in mitigating such disruptions in the future.

The development and expansion of our Facilities require significant quantities of critical components that are currently in high demand and may be difficult to source. To mitigate the risks associated with supply chain volatility, increasing demand, and uncertainty arising from U.S. tariffs and retaliatory international tariffs, we have proactively procured and currently maintain a supply of essential electrical infrastructure components and construction materials. These strategic reserves are intended to support the expansion and data center development of the Corsicana Facility and Rockdale Facility, the expansion of our Kentucky Facility, and the maintenance of our existing systems, and to reduce our exposure to potential inflationary pricing and equipment delivery delays.

We sell our bitcoin to fund operations. During 2026, we have experienced an impact from the recent volatility and downward trend in the market price of bitcoin, which has reduced the purchasing power of our bitcoin holdings. This decline may necessitate the sale of a greater volume of our bitcoin than previously anticipated to generate the liquidity required to fund our ongoing operations and working capital needs. By diversifying our infrastructure to support broader data services, we aim to mitigate our direct exposure to cryptocurrency price fluctuations and establish a more stable, diversified revenue stream centered on digital infrastructure.

Results of Operations

Comparative Results for the Three Months Ended June 30, 2026 and 2025:

Revenue

Total revenue for the three months ended June 30, 2026 and 2025 was $174.2 million and $153.0 million, respectively. Total revenue consists of Bitcoin Mining revenue, Data Center revenue, Engineering revenue, and Other revenue. Other revenue consists almost entirely of residual activity related to our former Data Center Hosting bitcoin mining operations. See below for explanations of changes in revenue by operating segment.

Bitcoin Mining revenue was $113.7 million and $140.9 million for the three months ended June 30, 2026 and 2025, respectively. The decrease of $27.2 million was primarily due to higher bitcoin prices in the 2025 period, which averaged $98,800 per bitcoin, as compared to $71,667 per bitcoin for the 2026 period, offset by an increase in Bitcoin production of 11.3% during the three months ended June 30, 2026 compared to the same period in 2025, primarily due to a 17.4% increase in average operating hash rate.

Data Center revenue of $23.2 million for the three months ended June 30, 2026 was attributable to leasing activity and associated tenant fit-out from the AMD Lease. We began recognizing our Data Center operations as a reportable segment in the first quarter of 2026. Accordingly, there were no Data Center revenues for the three months ended June 30, 2025.

Engineering revenue was $37.3 million and $10.6 million for the three months ended June 30, 2026 and 2025, respectively. The increase was primarily attributable to strong third-party data center demand for custom electrical equipment. Our custom electrical products are used as important components in data center development and in power generation and distribution facilities. There continues to be significant third-party demand for these products due to the increased interest in data center construction, as well as growing worldwide demand for power.

44

Table of Contents

Cost of revenue and operating expenses

The following table presents Cost of revenue for Bitcoin Mining:

Three Months Ended

June 30, 

  ​ ​ ​

2026

  ​ ​ ​

2025

Power

$

73,499

$

62,170

Compensation

5,299

4,686

Insurance on miners

1,076

1,462

Ground rent and related water and property tax

6,652

5,719

Other(1)

2,738

4,139

Total Bitcoin Mining cost of revenue

$

89,264

$

78,175

(1)All amounts included within Other are individually insignificant.

The increase of approximately $11.1 million in Cost of revenue for Bitcoin Mining was primarily due to increased Bitcoin Mining capacity and power consumption due to the 125 MW of power capacity at the Rockdale Facility that was assumed in the settlement of litigation between the Company and Rhodium Encore LLC in April 2025 (the “Rhodium Settlement”) and the continued expansion at the Kentucky Facility. The expanded facilities require additional headcount and direct costs necessary to maintain and support our expanded Bitcoin Mining operations. Cost of revenue for Bitcoin Mining excludes depreciation and amortization, which are stated separately on our Condensed Consolidated Statements of Operations.

Data Center Cost of revenue was $16.7 million for the three months ended June 30, 2026, which was attributable to leasing costs and contract services for tenant-fit-out for the AMD Lease. We began recognizing our Data Center operations as a reportable segment in the first quarter of 2026. Accordingly, there was no Data Center Cost of revenue for the three months ended June 30, 2025.

Cost of revenue for Engineering for the three months ended June 30, 2026 and 2025 was $27.0 million and $9.9 million, respectively, an increase of approximately $17.1 million. The costs consisted primarily of direct materials and labor, as well as indirect manufacturing costs. Consistent with the causes of increased Engineering revenue noted above, the increase was primarily due to increased receipts of materials resulting in our ability to complete projects.

Selling, general, and administrative expenses for the three months ended June 30, 2026 and 2025 were $82.0 million and $75.9 million, respectively, an increase of approximately $6.1 million. Selling, general, and administrative expenses consist of stock-based compensation, legal and professional fees, and other personnel and related costs. The increase was primarily due to a $5.4 million increase in stock-based compensation, a $4.8 million increase in compensation expense, and a $2.2 million increase in other costs to support our ongoing growth, partially offset by a $6.3 million decrease in legal and professional fees due to recently ending or settling much of our outstanding litigation.

Depreciation and amortization for the three months ended June 30, 2026 and 2025 was $97.8 million and $83.2 million, respectively, an increase of approximately $14.6 million. The increase was primarily due to increases in miners deployed.

The change in fair value of bitcoin for the three months ended June 30, 2026 and 2025 was a loss of $74.6 million and a gain of $470.8 million, respectively, and was recognized to adjust the fair value of our bitcoin held at the end of each period.

The change in fair value of our derivatives for the three months ended June 30, 2026 and 2025 was a loss of $8.4 million and $42.7 million, respectively, and was recorded to adjust the fair value of our PPAs, which were classified as derivatives and measured at fair value. The changes in fair value were due to changes in future power prices over the applicable periods. The loss incurred for the three months ended June 30, 2026 was primarily attributable to the average of the forward prices utilized in the discounted cash flow estimation models decreasing from $49.12 per MWh as of March 31, 2026 to $48.60 per MWh as of June 30, 2026. The loss recognized for the three months ended June 30, 2025 was primarily attributable to the average of the forward prices decreasing from $55.41 per MWh as of March 31, 2025 to $53.31 per MWh as of June 30, 2025.

Power curtailment credits for the three months ended June 30, 2026 and 2025 were $10.1 million and $8.3 million, respectively, and represent sales of unused power under our PPAs and participation in ancillary services under ERCOT and MISO Demand Response Service Programs. The amount of these credits varies from period to period depending on various factors impacting the supply of power to, and the demand for power on, the power grids, such as weather and global fuel costs.

45

Table of Contents

The change in fair value of contingent consideration was a loss of $9.4 million for the three months ended June 30, 2025, as a result of the change in estimates for the potential earnout contingent consideration to the former sellers in the Block Mining Acquisition and the E4A Solutions Acquisition. For the three months ended June 30, 2026, there was no change in the fair value of contingent consideration attributable to either the E4A Solutions Acquisition or the Block Mining Acquisition.

The loss on contract settlement of $158.1 million in 2025 was attributable to the Rhodium Settlement.

Impairment of property and equipment of $28.0 million during the three months ended June 30, 2026, was from certain long-lead items previously included in Construction in progress, within Property and equipment, net on the Condensed Consolidated Balance Sheets, related to the planned expansion of the Rockdale Facility for bitcoin mining purposes. These items were deemed to be impaired as a result of our decision to expand the Rockdale Facility for data center application purposes instead.

Other income (expense)

Interest income for the three months ended June 30, 2026 and 2025 was $3.6 million and $3.3 million, respectively. The increase was primarily due to an increase in average cash balances on deposit.

Interest expense for the three months ended June 30, 2026 and 2025 was $2.7 million and $6.1 million, respectively, and was primarily related to interest paid on our revolving lines of credit and letters of credit. The decrease was primarily related to the capitalization of $3.4 million of incurred interest into Construction in progress within Property and equipment, net on the Condensed Consolidated Balance Sheets, during the three months ended June 30, 2026. No incurred interest was capitalized during the three months ended June 30, 2025.

The gain on equity method investment – marketable securities for the three months ended June 30, 2025 was $6.1 million and was recognized to adjust the fair value of our equity method investment held at the end of each period. The equity method investment was sold in its entirety during the year ended December 31, 2025.

Comparative Results for the Six Months Ended June 30, 2026 and 2025:

Revenue

Total revenue for the six months ended June 30, 2026 and 2025 was $341.5 million and $314.4 million, respectively. Total revenue consists of our Bitcoin Mining revenue, Data Center revenue, Engineering revenue, and Other revenue. Other revenue consists almost entirely of residual activity related to our former Data Center Hosting bitcoin mining operations. See below for explanations of changes in revenue by operating segment.

Bitcoin Mining revenue was $225.6 million and $283.7 million for the six months ended June 30, 2026 and 2025, respectively. The decrease of $58.1 million was primarily due to lower bitcoin prices in the 2026 period, which averaged $73,736 per bitcoin, as compared to $95,991 per bitcoin for the 2025 period, partially offset by an increase in bitcoin production of 3.5% due to a 19.5% increase in our average operating hash rate.

Data Center revenue of $56.4 million for the six months ended June 30, 2026 was attributable to leasing activity and associated tenant fit-out from the AMD Lease. We recognized our new Data Center operations as a reportable segment in the six months ended June 30, 2026. Accordingly, there were no Data Center revenues for the six months ended June 30, 2025.

Engineering revenue was $59.5 million and $24.5 million for the six months ended June 30, 2026 and 2025, respectively. The increase was primarily attributable to the strong third-party data center demand for custom electrical equipment. Our custom electrical products are used as important components in data center development and in power generation and distribution facilities. There continues to be significant third-party demand for these products due to the increased interest in data center construction, as well as growing worldwide demand for power.

46

Table of Contents

Cost of revenue and operating expenses

The following table presents Cost of revenue for Bitcoin Mining:

Six Months Ended

June 30, 

  ​ ​ ​

2026

  ​ ​ ​

2025

Power

$

145,816

$

123,999

Compensation

10,344

9,131

Insurance on miners

2,538

2,924

Ground and facility rent, water, and property tax

12,308

7,862

Other(a)

5,020

9,077

Total Bitcoin Mining cost of revenue

$

176,026

$

152,993

(a)All amounts included in Other are individually insignificant.

The increase of approximately $23.0 million in Cost of revenue for Bitcoin Mining was primarily due to increased Bitcoin Mining capacity and power consumption due to the 125 MW of power capacity at the Rockdale Facility that was assumed in the settlement of litigation between the Company and Rhodium Encore LLC in April 2025 and the continued expansion at the Kentucky Facility. The expanded facilities require additional headcount and direct costs necessary to maintain and support our expanded Bitcoin Mining operations. Cost of revenue for Bitcoin Mining excludes depreciation and amortization, which are stated separately on our Condensed Consolidated Statements of Operations. In 2025, we acquired the Rockdale Facility land that was previously subject to a ground lease. As a result, ground rent was zero in 2026.

Data Center Cost of revenue was $47.5 million for the six months ended June 30, 2026, which was attributable to leasing costs and contract services for tenant-fit-out for the AMD Lease. We began recognizing our new Data Center operations as a reportable segment in January 2026. Accordingly, there was no Data Center Cost of revenue for the six months ended June 30, 2025.

Cost of revenue for Engineering for the six months ended June 30, 2026 and 2025 was $45.2 million and $21.7 million, respectively, an increase of approximately $23.5 million. The costs consisted primarily of direct materials and labor, as well as indirect manufacturing costs. Consistent with the causes of increased Engineering revenue noted above, the increase was primarily due to increased receipts of materials resulting in our ability to complete projects.

Selling, general, and administrative expenses for the six months ended June 30, 2026 and 2025 were $158.2 million and $147.4 million, respectively, an increase of approximately $10.8 million. Selling, general, and administrative expenses consist of stock-based compensation, legal and professional fees, and other personnel and related costs. The increase was primarily due to a $15.0 million increase in stock-based compensation, a $7.0 million increase in compensation expense, and a $2.7 million increase in other costs to support our ongoing growth, partially offset by an $11.3 million decrease in legal and professional fees due to recently ending or settling much of our outstanding litigation. Additional decreases were primarily due to lower consulting and insurance costs.

Depreciation and amortization for the six months ended June 30, 2026 and 2025 was $195.5 million and $161.1 million, respectively, an increase of approximately $34.4 million. The increase was primarily due to increases in miners deployed.

The change in fair value of bitcoin for the six months ended June 30, 2026 and 2025 was a loss of $401.3 million and a gain of $262.8 million, respectively, and was recognized to adjust the fair value of our bitcoin held at the end of each period.

The change in fair value of our derivatives for the six months ended June 30, 2026 and 2025 were losses of $60.2 million and $0.9 million, respectively, and was recorded to adjust the fair value of our PPAs, which were classified as derivatives and measured at fair value. The losses incurred for the six months ended June 30, 2026 were primarily attributable to the average of the forward prices utilized in the discounted cash flow estimation models decreasing from $55.70 per MWh as of December 31, 2025 to $48.60 per MWh as of June 30, 2026. The loss recognized for the six months ended June 30, 2025 was primarily attributable to the average of the forward prices increasing from $51.98 per MWh as of December 31, 2024 to $55.41 per MWh as of March 31, 2025, but then decreasing to $53.31 per MWh as of June 30, 2025.

Power curtailment credits for the six months ended June 30, 2026 and 2025 were $31.1 million and $16.1 million, respectively, and represent sales of unused power under our PPAs and participation in ancillary services under ERCOT and MISO Demand Response

47

Table of Contents

Service Programs. The amount of these credits varies from period to period depending on various factors impacting the supply of power to, and the demand for power on, the power grids, such as weather and global fuel costs.

The change in fair value of contingent consideration was a gain of $17.6 million for the six months ended June 30, 2025, as a result of the change in estimates for the potential earnout contingent consideration to the former sellers in the Block Mining Acquisition and the E4A Solutions Acquisition. For the six months ended June 30, 2026, there was no change in the fair value of contingent consideration attributable to either the E4A Solutions Acquisition or the Block Mining Acquisition.

The loss on contract settlement of $158.1 million in 2025 was attributable to the Rhodium Settlement.

Impairment of property and equipment of $28.0 million during the six months ended June 30, 2026, was from certain long-lead items previously included in Construction in progress, within Property and equipment, net on the Condensed Consolidated Balance Sheets, related to the planned expansion of the Rockdale Facility for bitcoin mining purposes. These items were deemed to be impaired as a result of our decision to expand the Rockdale Facility for data center application purposes instead.

Other income (expense)

Interest income for the six months ended June 30, 2026 and 2025 was $5.9 million and $6.7 million, respectively, and was earned from interest on cash balances held during the period. The decrease was primarily due to lower average cash balances on deposit, combined with slightly lower average interest rates during the 2026 period.

Interest expense for the six months ended June 30, 2026 and 2025 was $5.3 million and $8.4 million, respectively, and was primarily related to interest paid on our revolving lines of credit and letters of credit. The decrease was primarily related to the capitalization of $8.1 million of incurred interest into Construction in progress within Property and equipment, net on the Condensed Consolidated Balance Sheets during the six months ended June 30, 2026. No incurred interest was capitalized during the six months ended June 30, 2025.

The loss on equity method investment – marketable securities for the six months ended June 30, 2025 of $57.1 million was recognized to adjust the fair value of our equity method investment held at the end of each period. The equity method investment was sold in its entirety during the year ended December 31, 2025.

Non-GAAP Measures

In addition to financial measures presented under generally accepted accounting principles in the United States (“GAAP”), we consistently evaluate our use of and calculation of non-GAAP financial measures such as “Adjusted EBITDA.” EBITDA is computed as net income before interest, taxes, depreciation, and amortization. Adjusted EBITDA is a financial measure defined as EBITDA adjusted to eliminate the effects of certain non-cash and/or non-recurring items that do not reflect our ongoing strategic business operations, which management believes results in a performance measurement that represents a key indicator of our core business operations. The adjustments include fair value adjustments such as derivative power contract adjustments, equity securities fair value changes, and non-cash stock-based compensation expense, in addition to financing and legacy business income and expense items.

  

We believe Adjusted EBITDA can be an important financial performance measure because it allows management, investors, and our board of directors to evaluate and compare our operating results, including our return on capital and operating efficiencies, from period-to-period by making such adjustments. Additionally, Adjusted EBITDA is used as a performance metric for share-based compensation.

 

Adjusted EBITDA is provided in addition to, and should not be considered to be a substitute for, or superior to, net income, the most comparable measure under GAAP to Adjusted EBITDA. Further, Adjusted EBITDA should not be considered as an alternative to revenue growth, net income, diluted net income per share or any other performance measure derived in accordance with GAAP, or as an alternative to cash flow from operating activities as a measure of our liquidity. Adjusted EBITDA has limitations as an analytical tool, and you should not consider this financial measure either in isolation or as a substitute for analyzing our results as reported under GAAP.

48

Table of Contents

The following table reconciles Adjusted EBITDA to Net income (loss), the most comparable GAAP performance measure:

Three Months Ended

Six Months Ended

June 30, 

June 30, 

  ​ ​ ​

2026

  ​ ​ ​

2025

  ​ ​ ​

2026

  ​ ​ ​

2025

Net income (loss)

$

(237,170)

$

219,454

$

(737,647)

$

(76,913)

Interest income

 

(3,623)

 

(3,334)

 

(5,936)

 

(6,731)

Interest expense

2,687

6,093

5,305

8,401

Income tax expense (benefit)

 

(105)

 

320

 

186

 

757

Depreciation and amortization

 

97,784

 

83,197

 

195,518

 

161,123

EBITDA

 

(140,427)

 

305,730

 

(542,574)

 

86,637

 

  ​

 

  ​

 

  ​

 

  ​

Adjustments:

 

  ​

 

  ​

 

  ​

 

  ​

Stock-based compensation expense

 

35,582

 

30,120

 

74,748

 

59,696

Acquisition-related costs

 

 

111

 

 

187

Change in fair value of derivatives

 

8,362

 

42,747

 

60,214

 

853

Change in fair value of contingent consideration

 

 

(9,390)

 

 

(17,642)

Loss (gain) on equity method investment - marketable securities

(6,143)

57,095

Loss (gain) on sale of equipment

 

 

350

 

 

479

Casualty-related charges (recoveries), net

3

(119)

3

(119)

Loss on contract settlement

158,137

158,137

Gain on acquisition post-close dispute settlement

(26,007)

(26,007)

Impairment of property and equipment

27,972

27,972

Other (income) expense

 

(1,221)

 

(244)

 

(1,209)

 

(337)

Amortization of license fee revenue

 

 

(24)

 

 

(24)

Adjusted EBITDA

$

(69,729)

$

495,268

$

(380,846)

$

318,955

Liquidity and Capital Resources

We generate non-cash revenue through mining bitcoin at our Facilities, which we manage based on our Bitcoin Treasury Strategy, while financing operations and other expenses through sales of our bitcoin holdings, borrowing against our credit facilities, and issuance of common stock under the ATM offering program.

During the six months ended June 30, 2026, no shares were sold under the 2025 ATM Program. During the six months ended June 30, 2025, we issued and sold approximately 10.8 million shares of our common stock under our ATM offering program for aggregate net proceeds (net of commissions and expenses) of $121.1 million.

During the six months ended June 30, 2026, we sold 9,665 bitcoin for proceeds of approximately $732.5 million. During the six months ended June 30, 2025, we sold 1,371 bitcoin for proceeds of approximately $131.8 million. We monitor our balance sheet on an ongoing basis and evaluate the level of bitcoin retained in consideration of our cash requirements for ongoing operations and expansion.

During the six months ended June 30, 2026, we did not receive any proceeds from borrowings against our credit facilities. During the six months ended June 30, 2025, we received $251.9 million in net proceeds (net of repayments and issuance costs) from borrowings against our credit facilities.

As of June 30, 2026, we had net working capital of approximately $268.0 million, which included cash and cash equivalents of $471.4 million. We reported a net loss of $737.6 million during the six months ended June 30, 2026, which included $541.0 million in non-cash net losses, primarily consisting of the loss from the change in fair value of bitcoin of $401.3 million, depreciation and amortization of $195.5 million, stock-based compensation of $74.7 million, and the change in the fair values of derivatives of $60.2 million, partially offset by revenue recognized from bitcoin mined of $225.6 million.

Contractual Commitments and Obligations

As of June 30, 2026, we had a remaining commitment of approximately $7.7 million due to MicroBT for the contractual purchase of miners, which we expect to pay through the fourth quarter of 2026.

49

Table of Contents

Revenue from Operations

Bitcoin Mining

We expect to generate ongoing revenue from bitcoin rewards in connection with our Bitcoin Mining operations and we will continue to evaluate our ability to liquidate bitcoin rewards at future values to generate cash to fund our operations and expansion.

Generating bitcoin rewards which exceed our production and overhead costs is critical to our ability to report profit margins from our Bitcoin Mining operations, although accounting for our reported profitability is increasingly complex. Furthermore, regardless of our ability to generate proceeds from the sale of our bitcoin produced from our Bitcoin Mining business, we may need to raise additional capital in the form of equity or debt to fund our operations and pursue our business strategy.

The ability to raise funds through the sale of equity, debt financings, or the sale of bitcoin to maintain our operations is subject to many risks and uncertainties and any future equity issuances or convertible debt offerings could result in dilution to our existing stockholders and any future debt or debt securities may contain covenants that limit our operations or ability to enter into certain transactions. Our ability to realize revenue through bitcoin production and successfully convert bitcoin into cash or fund overhead with bitcoin is subject to a number of risks, including regulatory, financial, and business risks, many of which are beyond our control. Additionally, we have observed significant historical volatility in the market price of bitcoin and, as such, future prices cannot be predicted.

Data Center

Data Center revenue is derived from lease income from the leasing of data center space and provisioning of power under long-term lease agreements, and the construction of assets to support tenants.

Lease rent and power reimbursement income is recognized on a monthly basis as costs are incurred and services are provided and revenue generated from providing tenant fit-out services is recognized using the percentage of completion model whereby total costs incurred are divided by total costs expected to be incurred, which reflects progress towards completion of the performance obligation.

Customers are typically required to make monthly rent and power reimbursement payments as well as periodic tenant fit-out progress payments based on contractually agreed-upon milestones.

Engineering

Substantially all Engineering revenue is derived from the sale of custom products built to customers’ specifications under fixed-price contracts. Revenue is recognized over time as performance creates or enhances an asset with no alternative use, and for which we have an enforceable right to receive compensation as defined under the contract. The length of time required to complete a custom product varies but is typically between four and 12 weeks.

Customers are typically required to make periodic progress payments based on contractually agreed-upon milestones.

If we are unable to generate sufficient revenue from our Bitcoin Mining, Data Center, or Engineering operations when needed or secure additional sources of funding, it may be necessary to significantly reduce our current rate of spending or explore other strategic alternatives.

ATM Equity Offerings

During 2025 and 2024, we offered and sold shares of our common stock through ATM offering programs pursuant to sales agreements with sales agents (each, an “ATM Program”).

The following table sets forth shares sold and net proceeds received (net of sales commissions and expenses) from shares sold under our August 2024 ATM Program:

Six Months Ended June 30, 

  ​ ​ ​

2025

Shares

Net Proceeds

August 2024 ATM Program

10,775,462

$

121,062

50

Table of Contents

As of June 30, 2026, no shares had been sold under the 2025 ATM Program and all $500.0 million of our common stock remained available for issuance and sale pursuant to the 2025 ATM Program. For additional information regarding our ATM Program, see Note 13. Stockholders’ Equity.

Legal Proceedings

We have been named a defendant in several lawsuits, as more fully described in Note 16. Commitments and Contingencies.

Cash Flows

The following table presents a summary of our cash flows:

Six months ended June 30, 

2026

  ​ ​ ​

2025

Net cash provided by (used in) operating activities

$

(272,787)

$

(353,385)

Net cash provided by (used in) investing activities

$

514,757

$

(40,019)

Net cash provided by (used in) financing activities

$

(2,891)

$

372,351

Operating Activities

The $80.6 million decrease in cash used in operating activities for the six months ended June 30, 2026, as compared to the six months ended June 30, 2025, was primarily attributable to the payment of a one-time cash cost of $122.6 million related to the loss on the Rhodium Settlement during the three months ended June 30, 2025, partially offset by an increase in power costs of $22.2 million and a one-time cash payment of $20.0 million for the SBI legal settlement during the six months ended June 30, 2026.

Investing Activities

For the six months ended June 30, 2026, net cash provided by investing activities was primarily attributable to proceeds from the sale of bitcoin of $732.5 million, partially offset by purchases and deposits paid for miners and purchases of property and equipment for our ongoing expansions, for which we paid approximately $41.4 million, with anticipated additional payments of $7.7 million to be made through the fourth quarter of 2026, and payments of approximately $176.2 million for the purchase of property and equipment, including construction in progress.

For the six months ended June 30, 2025, net cash used in investing activities was primarily attributable to payments of approximately $93.2 million for the purchase of property and equipment, including construction in progress, and $86.4 million in deposits and payments for the purchase of miners, partially offset by proceeds from the sale of bitcoin of $131.8 million and proceeds of $14.7 million from the sale of marketable securities.

Financing Activities

For the six months ended June 30, 2026, net cash used in financing activities was $2.9 million. No cash was raised through the issuance of common stock or debt during the period. The net cash used in financing activities was primarily attributable to $2.5 million in common shares repurchased to satisfy employee tax withholding obligations. For the six months ended June 30, 2025, net cash provided by financing activities primarily consisted of total net proceeds of $254.3 million from our debt and net proceeds from our ATM Program offerings of $121.1 million.

As of June 30, 2026, we have approximately $853.7 million in total principal on our debt outstanding, primarily consisting of $594.4 million from our 2030 Notes, $200.0 million from our bitcoin-backed credit facility, $54.3 million from our revolving credit facilities, and $5.0 million from a note.

We have primarily financed our strategic growth through proceeds from the issuance of our common stock through ATM Program offerings and various credit facilities, and it is reasonably likely that we will continue to finance our ongoing growth similarly.

Critical Accounting Policies and Estimates

In preparing our financial statements in accordance with GAAP, there are certain accounting policies that may require a choice between acceptable accounting methods or may require substantial judgment or estimation in their application. The methods,

51

Table of Contents

estimates, and judgments we use in applying our most critical accounting policies have a significant impact on the results we report in our Condensed Consolidated Financial Statements. An accounting estimate is considered critical if both (i) the nature of the estimates or assumptions is material due to the levels of subjectivity and judgment involved, and (ii) the impact within a reasonable range of outcomes of the estimates and assumptions is material to our Condensed Consolidated Financial Statements. These include: business combinations, valuation of the Rockdale PPA and the Corsicana PPA, long-lived assets, and stock-based compensation. We believe these and other accounting policies set forth in Note 2. Summary of Significant Accounting Policies and Recent Accounting Pronouncements should be reviewed as they are integral to understanding our results of operations and financial condition.

We have discussed the selection of critical accounting policies and the effect of estimates with the Audit Committee of our Board.

Business combinations

Accounting for business combinations requires management to make significant estimates and assumptions, especially at the acquisition date, including estimates for property and equipment and contingent consideration, where applicable. Although we believe our assumptions and estimates have been reasonable and appropriate, they are based in part on historical experience and information obtained from management of the acquired companies and are inherently uncertain. Estimates used in determining the value of property and equipment included the estimated replacement costs, which included replacement cost new, remaining life, and effective age. Estimates primarily used in determining the value of the contingent consideration included the timing and probability of achieving milestones and discount rates.

Rockdale PPA and Corsicana PPA Valuations

The Rockdale PPA and the Corsicana PPA are accounted for as derivatives, the valuations of which are based on significant unobservable inputs, which include discounted cash flow estimation models containing quoted commodity exchange spot and forward prices and are adjusted for basis spreads for load zone-to-hub differentials through the respective terms of the Rockdale PPA and the Corsicana PPA. Significant judgment and estimations are required when creating the discounted cash flow estimation models. Should our discounted cash flow estimation models change significantly, potentially material changes to the fair value of the derivatives may result, which could have a material impact on our financial statements.

See Note 8. Power Supply Agreements for a discussion of the unobservable inputs and their impact on the valuation.

Long-Lived Assets

Long-lived assets are stated at cost and depreciated using the straight-line method over the estimated useful lives of the assets. Judgment is necessary in estimating our various assets’ useful lives. This includes evaluating our own usage experience with our currently owned assets, the quality of materials used in construction-related projects, and for our miners, the rate of technological advancement and market-related factors such as the price of bitcoin and the bitcoin network hash rate, which impact the value of the miners. Long-lived assets are reviewed for impairment whenever events or changes in circumstances indicate that the carrying amount of an asset may not be recoverable, which is determined based on a comparison of the carrying amount of an asset to undiscounted future cash flows expected to be generated by the asset. Significant judgment is used when estimating future cash flows, particularly the price of bitcoin and the bitcoin network hash rate. If such assets are considered impaired, an impairment is recognized based on the amount by which the carrying amount exceeds the estimated fair value of the assets.

Should our estimates of useful lives, undiscounted future cash flows, or asset fair values change, additional, and potentially material impairments may be required, which could have a material impact on our reported financial results.

Stock-Based Compensation

Stock-based compensation expense related to share-based payment awards is recognized at the grant date of the award and is estimated based on the fair market value of our common stock on the date of the grant. Compensation cost for performance-based, share-based payment awards is recognized over the performance period when achievement of the milestones and targets becomes probable. We use significant judgment in determining the likelihood of meeting milestones and market conditions. Inputs into valuation models such as Monte Carlo simulations include both the Company’s and the Russell 3000’s historical and expected annual volatilities, and depending on the inputs selected, we could calculate significantly different estimated grant date fair values, materially impacting the valuation of our stock-based awards and the stock-based compensation expense we recognize in future periods.

52

Table of Contents

Recent Accounting Pronouncements

See Note 2. Summary of Significant Accounting Policies and Recent Accounting Pronouncements for a description of applicable recent accounting pronouncements and any material impact on our financial statements.

Off-Balance Sheet Arrangements

We do not have any off-balance sheet arrangements.

Item 3. Quantitative and Qualitative Disclosures About Market Risk

The following discussion about our market risk exposures involves forward-looking statements. Actual results could differ materially from those projected in our forward-looking statements. For more information regarding the forward-looking statements used in this section and elsewhere in this Quarterly Report, see the “Cautionary Note Regarding Forward-Looking Statements” at the forepart of this Quarterly Report.

The sensitivity analyses disclosed below provide only a limited, point-in-time view of the market risk of the financial instruments discussed. The actual impact of the respective underlying rates and price changes on the financial instruments may differ significantly from those shown in the sensitivity analyses.

Risks Regarding the Price of Bitcoin

Our business and development strategy is focused on maintaining and expanding our Bitcoin Mining operations to maximize the amount of new bitcoin rewards we earn. As of June 30, 2026, we held 11,380 bitcoin recognized at its fair value of $0.7 billion.

The market price of bitcoin is highly volatile, and we cannot accurately predict future price movements. Fluctuations in Bitcoin’s market value directly affect revenue generated from our mining operations. In addition, any decline in the fair value of the bitcoin we mine and hold for our account would be reflected in our financial statements as a charge against net income, which could have a material adverse effect on our results of operations and the market price for our securities.

We manage our exposure to bitcoin price volatility by investing in energy-efficient miners and vertical integration, and by diversifying our revenue streams through our data center initiatives. Management regularly monitors market conditions and liquidity requirements to determine the timing of bitcoin sales and our capital expenditures.

The following table presents the impact of 10% changes in the price of bitcoin on our bitcoin holdings during the applicable period:

For the six months ended June 30, 2026

For the six months ended June 30, 2025

  ​ ​ ​

10% Increase in

10% Decrease in

10% Increase in

10% Decrease in

Price of Bitcoin

Price of Bitcoin

Price of Bitcoin

Price of Bitcoin

Increase/(Decrease) in Net Income

$

139,818

$

(139,818)

$

338,388

$

(338,388)

The decreased sensitivity to price changes in 2026 as compared to 2025 was primarily due to the decrease in our bitcoin holdings in 2026, and as of June 30, 2026, as compared to June 30, 2025.

Risk Regarding the Price of Commodities

Our operations are highly dependent on the availability and cost of electricity. Certain of our operating costs are subject to price fluctuations caused by the volatility of underlying commodity prices, including the cost of power used in our Bitcoin Mining and data center operations. We manage commodity price risk through PPAs and participation in energy demand-response programs that allow us to curtail operations and return capacity to the grid during periods of high demand. Management considers forward power prices, grid reliability requirements, and operational flexibility when determining the extent of its risk management strategy over

53

Table of Contents

power costs. While these strategies are intended to mitigate the impact of price volatility, significant increases in electricity costs or disruptions in power supply could still have a material adverse effect on our results of operations and financial condition.

The following table presents the hypothetical impact on our net income of 10% changes in the future power prices (taking into account the dates of maturity of our various fixed price PPAs) used to derive the fair value of the Rockdale PPA and the Corsicana PPA derivatives:

For the six months ended June 30, 2026

For the six months ended June 30, 2025

  ​ ​ ​

10% Increase in

10% Decrease in

10% Increase in

10% Decrease in

Future Power Prices

Future Power Prices

Future Power Prices

Future Power Prices

Increase/(Decrease) in Net Income

$

29,174

$

(29,175)

$

41,537

$

(41,537)

Item 4. Controls and Procedures

Evaluation of Disclosure Controls and Procedures

Our management, with the participation of our Chief Executive Officer (principal executive officer) and our Chief Financial Officer (principal financial officer), has evaluated the effectiveness of our disclosure controls and procedures (as such term is defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act) as of June 30, 2026 to ensure that the information required to be disclosed by the Company in the reports that it files or submits under the Exchange Act is recorded, processed, summarized, and reported within the time periods specified in SEC rules and forms, and that information required to be disclosed in the reports we file or submit under the Exchange Act is accumulated and communicated to our management, including our Chief Executive Officer (principal executive officer) and Chief Financial Officer (principal financial officer), to allow timely decisions regarding required disclosures. It should be noted that the design of any system of controls is based in part upon certain assumptions about the likelihood of future events, and there can be no assurance that any design will succeed in achieving its stated goals under all potential future conditions, regardless of how remote.

Based on this evaluation, our management, with the participation of our Chief Executive Officer (principal executive officer) and our Chief Financial Officer (principal financial officer), concluded that our disclosure controls and procedures were effective at the reasonable assurance level as of June 30, 2026.

Changes in Internal Control

There have not been any changes in our internal control over financial reporting (as such term is defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act) during the quarter ended June 30, 2026, that materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

PART II - OTHER INFORMATION

Item 1. Legal Proceedings

Disclosure under this Item is incorporated by reference to the disclosure provided in Note 16. Commitments and Contingencies.

Item 1A. Risk Factors

Investors should carefully review and consider the information regarding certain factors that could materially affect our business, results of operations, financial condition, cash flows, and equity as set forth herein and in Part I, Item 1A. Risk Factors of our 2025 Annual Report. There have been no material changes, other than the amendment below, to the risk factors set forth in our 2025 Annual Report. We may disclose changes to our risk factors or disclose additional risk factors from time to time in our future filings with the SEC. Additional risks and uncertainties not presently known to us or that we currently believe not to be material may also adversely impact our business, financial condition, results of operations, cash flows, and equity.

The following risk factor supersedes the similar risk factor previously disclosed in our 2025 Annual Report.

54

Table of Contents

We are dependent on our electrical distribution provider, grid operator, and regulators for access to power, and we face electricity market risks relating to changes in laws, regulations, and market requirements that could have a material adverse effect on our financial condition, results of operations, and cash flows.

Our access to power is dependent on our electrical distribution providers, grid operators, and regulators, which collectively manage whether our operations are performing in accordance with market rules, requirements, and regulations. PUCT, ERCOT, and Oncor collectively oversee the regulatory, administrative, and delivery aspects of our power supply in Texas; MISO and Big Rivers Electric Corporation oversee our power supply at our Commerce site in Kentucky. Tennessee Valley Authority oversees the delivery and regulation of the power supply at our Blue Steel site in Kentucky. Regulatory scrutiny of bitcoin mining facilities and their energy consumption has intensified as the industry has grown, along with heightened focus more broadly on the energy and environmental impacts of data center services. This scrutiny, in addition to increasing pressure at the federal level from the Federal Energy Regulatory Commission and the North American Electric Reliability Corporation, has led, and may continue to lead, to new governmental measures regulating, restricting, or prohibiting the use of electricity by data centers and bitcoin mining operators, or increasing power costs for these types of consumers.

As the primary Texas grid operator, ERCOT is responsible for monitoring and testing market participants, including the Rockdale Facility and the Corsicana Facility, to assess their impact on grid reliability. In April 2022, ERCOT established a task force to review the participation of large flexible loads, including bitcoin mining facilities and data centers, in the ERCOT market, tasked with developing policy recommendations concerning network planning, market operations, and the interconnection processes for large flexible loads. We are periodically tested and monitored and have experienced curtailment of power through this testing process based on instructions from Oncor and ERCOT. If ERCOT determines that our data centers’ substantial power usage negatively affects grid reliability, it could issue a curtailment order, requiring us to reduce or cease our power use immediately, and our power supply in Texas could be partially or fully curtailed.

More recently, in 2025, the Texas legislature enacted Senate Bill (“SB”) 6 to support ERCOT’s grid reliability by, among other things, proposing minimum transmission rates on certain large loads and removing “phantom loads” from the interconnection queue to improve the accuracy of future load growth projections. SB 6 requires the PUCT and ERCOT to create new processes and impose new requirements for the interconnection of facilities with large electrical loads of at least 75 MW, requires security-type payments as part of the initial interconnection request, and creates a new approval requirement for co-locating generation with large loads. Under the initial batch study rules recently adopted to implement SB 6, which remain subject to change, (PUCT Project No. 58481), an interconnecting large load entity (“ILLE”) seeking new or modified interconnection is divided into three categories: base load, studied/allocated load, or excluded from Batch Zero pending a future study process. Depending on the eligibility category, an ILLE may be required to hold sufficient property interest and post financial security for system upgrades (ranging from $0 if no upgrades are required, to an estimated cost based on applicable study results, to a flat fee of $50,000 per MW of peak demand where transmission improvement costs cannot be determined). An ILLE must also pay an interconnection fee, satisfy all direct interconnection costs in full through contribution in aid of construction (CIAC) with no standard utility offset, and comply with additional study, disclosure, and interim-agreement requirements. On August 3, 2026, Texas Governor Abbott directed the PUCT and ERCOT to conduct a comprehensive audit of all data center projects advancing through ERCOT's interconnection process and to complete that audit before any such project may proceed; projects that fail to meet PUCT and ERCOT requirements or applicable state law will be denied grid interconnection. The directive also requires the collection of project-level information regarding each project's use of public financial incentives, reliance on the ERCOT grid versus on-site generation, and use of community water supplies. The PUCT Commissioners are scheduled to hold an Open Meeting on August 14, 2026 to discuss related policy issues, including ERCOT's audit and information-collection plans. Because certain of our Texas data center projects are advancing through the ERCOT interconnection process, these actions could delay or prevent interconnection of those projects, increase our costs, reduce expected incentives, and have a material adverse effect on our business and results of operations. SB 6 also requires the PUCT to amend its wholesale transmission cost-allocation rules by December 31, 2026, and the PUCT is considering measures that could require large loads such as our facilities to bear a greater share of transmission system upgrade costs, to pay minimum demand charges based on contracted peak demand for a period of 20 years, and to move from the current four coincident peak (“4CP”) cost-allocation methodology to a new 12CP cost-allocation methodology. If adopted, these measures could materially increase our transmission-related charges and limit our ability to manage power costs through demand-response and 4CP-avoidance strategies on which we have historically relied. SB 6 further directs ERCOT and the PUCT to establish curtailment and demand-management obligations for large loads, including protocols to curtail large loads interconnected at transmission voltage after December 31, 2025, during firm load-shed events and a reliability service under which ERCOT may procure demand reductions from large loads and deploy them on short notice during emergency grid conditions, any of which could require us to reduce or suspend operations with limited advance notice. ERCOT has also amended, and continues to evaluate, its processes for interconnecting large electrical loads, including a process announced in December 2025 that will batch multiple large load interconnection requests together to evaluate system impacts on a portfolio basis for transmission planning purposes. Separately, ERCOT has adopted new voltage and frequency

55

Table of Contents

ride-through requirements applicable to large computational loads (generally defined as loads of at least 75 MW where 50% or more of the demand is computational, such as data centers and bitcoin mining facilities), a category that includes our data center facilities, through Nodal Operating Guide Revision Request (“NOGRR”) 282 and the companion Nodal Protocol Revision Request (“NPRR”) 1308. NOGRR 282 and NPRR 1308 were approved by the PUCT and are scheduled to become effective on August 1, 2026. These requirements, among other things, raise the high-frequency ride-through threshold applicable to large loads to 63.0 Hz and extend dynamic modeling requirements to large loads, and may require us to install additional equipment, modify our facilities, and demonstrate specified ride-through capabilities designed to ensure our facilities remain connected to, and do not destabilize, the ERCOT grid during frequency or voltage disturbances. These requirements provide an exemption for large computational loads that were operational, or had received ERCOT’s written approval to energize (or had signed an interconnection agreement or received notice to proceed), on or before November 14, 2025, subject to specified conditions; we can provide no assurance that our Rockdale Facility, our Corsicana Facility, or any expansion capacity will qualify for this exemption, and to the extent they do not, we may incur significant costs to achieve and demonstrate compliance. These developments, together with potential requirements relating to grid stability, voltage ride-through, frequency ride-through, and curtailment obligations, could increase our costs, delay our project timelines, or impose additional operational constraints. In 2024, the PUCT also required operators of large virtual currency mining operations connected to the grid to register their facilities with the PUCT.

If we cannot secure adequate electrical power, whether due to transmission or distribution system reliability curtailments, new interconnection requirements, increased costs, or other regulatory constraints, we may be forced to reduce or shut down our operations, which would have a material adverse effect on our business, prospects, financial condition, and operating results and, consequently, an investment in our securities.

Item 2. Unregistered Sales of Equity Securities and Use of Proceeds

The following table presents our repurchases of our common stock during the three months ended June 30, 2026:

  ​ ​ ​

  ​ ​ ​

Total Number

  ​ ​ ​

Maximum

of Shares

Number of

Purchased as

Shares that

Total

Part of

May Yet Be

Number of

Average

Publicly

Purchased

Shares

Price Paid

Announced Plans

Under the Plans

Period

Purchased (a)

per Share (b)

or Programs

or Programs

April 1, 2026 through April 30, 2026

-

$

-

N/A

N/A

May 1, 2026 through May 31, 2026

3,700

23.49

N/A

N/A

June 1, 2026 through June 30, 2026

15,036

27.38

N/A

N/A

Total

18,736

$

26.61

  ​

  ​

(a)During the quarter ended June 30, 2026, pursuant to our 2019 Equity Incentive Plan, certain of our employees surrendered shares of common stock to us to satisfy statutory minimum federal and state tax obligations associated with the vesting of restricted stock awards.
(b)The price paid per share is based on the closing price of our common stock as of the date of the determination of the statutory minimum for federal and state tax obligations.

Item 5. Other Information

During the three months ended June 30, 2026, none of our directors or officers (as defined in Rule 16a-1(f) under the Exchange Act) adopted, modified, or terminated any contract, instruction or written plan for the purchase or sale of our securities that was intended to satisfy the affirmative defense conditions of Rule 10b5-1(c) under the Exchange Act or any “non-Rule 10b5-1 arrangement” as defined in Item 408(c) of Regulation S-K.

56

Table of Contents

Item 6. Exhibits

The following are incorporated by reference herein to the exhibit previously filed with the SEC at the location indicated below or are filed or furnished herewith as indicated below:

Exhibit

  ​ ​ ​

Description

Location

2.1

Plan of Merger, dated effective as of December 30, 2022, by and between Riot Blockchain, Inc. and Riot Platforms, Inc.

Exhibit 2.1 of the Current Report on Form 8-K filed January 3, 2023.

3.1

Articles of Incorporation filed September 19, 2017.

Exhibit 3.1 of the Current Report on Form 8-K filed September 25, 2017.

3.2

Amendment to the Articles of Incorporation of Riot Blockchain, Inc. dated November 21, 2022.

Exhibit 3.1 of the Current Report on Form 8-K filed November 23, 2022.

3.3

Certificate of Amendment to the Articles of Incorporation of Riot Platforms, Inc. dated June 13, 2024.

Exhibit 3.1 of the Current Report on Form 8-K filed June 18, 2024.

3.4

Amended and Restated Bylaws effective March 26, 2026.

Exhibit 3.1 of the Current Report on Form 8-K filed April 1, 2026.

3.5

Articles of Merger between Bioptix, Inc. and Riot Blockchain, Inc.

Exhibit 3.1 of the Current Report on Form 8-K filed October 4, 2017.

3.6

Articles of Merger between Riot Blockchain, Inc. and Riot Platforms, Inc.

Exhibit 3.1 of the Current Report on Form 8-K filed January 3, 2023.

10.1 †*

Second Amended and Restated Credit Agreement, dated as of April 21, 2026, between Riot Platforms, Inc. and Coinbase Credit, Inc.

Exhibit 10.1 of the Current Report on Form 8-K filed April 27, 2026.

10.2 +

Seventh Amendment to the 2019 Equity Incentive Plan of Riot Platforms, Inc. 

Exhibit 10.1 of the Current Report on Form 8-K filed June 15, 2026.

10.3 +

2019 Equity Incentive Plan of Riot Platforms, Inc., as amended

Exhibit 10.2 of the Current Report on Form 8-K filed June 15, 2026.

31.1

Rule 13a-14(a)/15d-14(a) - Certification of Chief Executive Officer (principal executive officer).

Filed herewith.

31.2

Rule 13a-14(a)/15d-14(a) - Certification of Chief Financial Officer (principal financial officer).

Filed herewith.

32.1

Section 1350 Certification Pursuant to 18 U.S.C. Section 1350, as Adopted Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 (Principal Executive Officer).

Filed herewith.

32.2

Section 1350 Certification Pursuant to 18 U.S.C. Section 1350, as Adopted Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 (Principal Financial Officer).

Filed herewith.

101

The following financial statements and notes from the Company’s Quarterly Report for the three and six months ended June 30, 2026, are formatted in iXBRL (inline XBRL): (i) Condensed Consolidated Balance Sheets as of June 30, 2026 and December 31, 2025; (ii) Condensed Consolidated Statements of Operations for the Three and Six Months Ended June 30, 2026

Filed herewith.

57

Table of Contents

and 2025; (iii) Condensed Consolidated Statements of Comprehensive Income (Loss) for the Three and Six Months Ended June 30, 2026 and 2025; (iv) Condensed Consolidated Statements of Stockholders’ Equity for the Three and Six Months Ended June 30, 2026 and 2025; (v) Condensed Consolidated Statements of Cash Flows for the Six Months Ended June 30, 2026 and 2025; and (vi) Notes to Condensed Consolidated Financial Statements.

104

Cover Page Interactive Data File (formatted as Inline XBRL and contained in Exhibit 101).

Filed herewith.

+ Indicates a management contract or compensatory plan or arrangement.

Portions of this exhibit have been omitted in accordance with Item 601(b)(10)(iv) of Regulation S-K.

* Certain schedules and appendices have been omitted pursuant to Item 601(a)(5) of Regulation S-K. The Company hereby undertakes to furnish to the SEC, upon request, copies of any such instruments.

58

Table of Contents

SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.

Date: August 10, 2026

RIOT PLATFORMS, INC.

(Registrant)

/s/ Jason Les

Jason Les

Chief Executive Officer

(Principal Executive Officer)

/s/ Jason Chung

Jason Chung

Chief Financial Officer

(Principal Financial Officer)

59