STOCK TITAN

Seabridge Gold earns C$118M in 2026's first nine months

Available on EDGAR Accepted by SEC EDGAR Learn about SEC filing dates
(Moderate)

Sentiment and the balance of points

Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.

Form Type
6-K

Rhea-AI Filing Summary

Seabridge Gold Inc. reported net income of C$117.6 million for the nine months ended September 30, 2026, compared with a C$9.4 million loss a year earlier. The result included a C$151.7 million gain on the June 3, 2026 distribution of Valor Gold Corp.; Seabridge shareholders received 0.511 Valor common shares for each Seabridge common share, and the distribution was valued at C$211.8 million.

Cash and cash equivalents were C$56.3 million at September 30, and net cash used in operating activities was C$13.0 million for the nine months. Seabridge drew US$50.0 million under a US$100.0 million unsecured loan facility by quarter-end and drew the remaining US$50.0 million on November 2, 2026. The facility bears 7% annual interest; drawn amounts are due on or before December 31, 2026.

Under its gold purchase agreement with Valor, Seabridge is required to purchase 10% of refined gold production once commercial production begins, for quarters when the average quarterly gold price equals or exceeds US$4,000 per ounce. Seabridge pays US$4,000 per delivered ounce, and the agreement has an initial 40-year term. The KSM feasibility study remains targeted for completion by the end of 2027.

1 point · 0 major

How this balance works

Rhea-AI gives every point it takes from this document a weight. Minor counts 1, Moderate 3 and Major 9, so one Major point outweighs several Minor ones. The bar adds up the weights on each side, and when neither side holds more than 65% of the total the balance reads Mixed.

It reads the document as published, with the same rules for every company, and it does not look at what the market expected or at how the stock traded, so a point can be objectively good on a day the stock falls.

Rhea-AI Sentiment measures something else, the tone of the wording.

0 major · 2 points

Hollow bars mark forward-looking points. How the balance works

Positive

  • Moderate pointNine-month net income was C$117.6 million, versus a C$9.4 million loss in 2025.

Negative

  • Moderate pointNine-month operating cash used was C$13.0 million, versus C$7.4 million in 2025.
  • Moderate point. Forward-looking: it has not happened yet and may not happen.The fully drawn US$100.0 million facility is due on or before December 31, 2026. 3.8% of market cap
Net income C$117.6 million Nine months ended September 30, 2026; compared with a C$9.4 million loss in the same 2025 period.
Gain on distribution C$151.7 million Nine months ended September 30, 2026; Valor Gold Corp. distribution.
Net cash used in operating activities C$13.0 million Nine months ended September 30, 2026; compared with C$7.4 million in 2025.
Cash and cash equivalents C$56.3 million As of September 30, 2026.
Loan facility US$100.0 million Fully drawn on November 2, 2026; amounts drawn are due on or before December 31, 2026.
Loan interest rate 7% per annum Unsecured non-revolving loan facility.
Valor distribution fair value C$211.8 million Fair value at the June 3, 2026 distribution.
Gold stream terms 10% of refined gold production; US$4,000 per ounce Purchases begin at commercial production for quarters when the average quarterly gold price equals or exceeds US$4,000 per ounce.
At-The-Market financial
"issued 759,222 common shares under the At-The-Market program"
"At-the-market" is a method for companies to sell new shares of stock directly into the open market over time, rather than all at once. It allows companies to raise money gradually, similar to selling slices of a pie instead of the entire pie at once, which can help manage the sale's impact on the stock price. This approach gives investors a steady supply of shares while providing companies with flexible funding options.
gold stream financial
"purchase 10% of refined gold production from the Courageous Lake Project"
A gold stream is a contract where an investor or firm pays cash up front to a mining company in exchange for the right to buy a portion of that mine’s future gold at a set, usually below-market, price or to receive a fixed share of production. It matters to investors because it provides miners with immediate funding without issuing traditional debt or equity, while the streamer gains long-term exposure to gold at a predictable cost — a trade-off between lower purchase price and limited upside if gold prices rise sharply.
Level 3 fair value measurement financial
"classified as a Level 3 fair value measurement"
Silver Financing Put financial
"Silver Financing Put exercise date to March 24, 2028"
weighted average cost of capital financial
"discount rates determined using weighted average cost of capital"
Weighted average cost of capital (WACC) is the average annual price a company pays for the money it uses, combining the cost of borrowed funds (debt) and the cost of owners’ funds (equity), with each source weighted by its share of the company’s financing. Investors use it as a benchmark to judge whether projects or a stock are likely to earn more than that blended price—think of it as a household’s combined interest rate on a mortgage and credit cards; a lower WACC usually makes future cash flows and valuation more attractive.
non-revolving loan agreement financial
"unsecured non-revolving loan agreement with a strategic investor"

FAQ

AI-generated questions and answers. How Rhea-AI works. Not financial advice.

What was Seabridge Gold (SA) net income for the first nine months of 2026?

Seabridge reported net income of C$117.6 million for the nine months ended September 30, 2026, compared with a C$9.4 million net loss in the same 2025 period. The 2026 result included a C$151.7 million gain on distribution of mineral properties.

How much did Seabridge Gold (SA) draw under its loan facility, and when is it due?

Seabridge arranged an unsecured non-revolving facility of up to US$100.0 million at 7% annual interest. US$50.0 million had been drawn by September 30, 2026, and the remaining US$50.0 million was drawn on November 2, 2026. Amounts drawn are due on or before December 31, 2026.

What are the terms of Seabridge Gold’s (SA) gold stream agreement with Valor?

The agreement requires Seabridge to purchase 10% of refined gold production from the Courageous Lake Project. Purchases begin upon achievement of commercial production and apply in quarters when the average quarterly gold price equals or exceeds US$4,000 per ounce; Seabridge pays US$4,000 per delivered ounce. The initial term is 40 years.

How many Valor shares did Seabridge Gold (SA) shareholders receive in the spin-out?

Shareholders received 0.511 Valor common shares for each Seabridge common share held in the distribution completed June 3, 2026. The distribution was valued at C$211.8 million and resulted in a C$151.7 million gain.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 6-K
REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934
For the month of November 2026
Commission File Number 1-32135
SEABRIDGE GOLD INC.
(Name of Registrant)
106 Front Street East, Suite 400, Toronto, Ontario, Canada M5A 1E1
(Address of Principal Executive Office)
Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.
Form 20-F o Form 40-F x



SEABRIDGE GOLD INC.
(the “Company”)
See the Exhibit Index hereto for a list of the documents filed herewith and forming a part of this Form 6-K.
Exhibits 99.1 and 99.2 hereto are incorporated by reference as exhibits to the Company’s registration statements on Form S-8 (File No. 333-211331) and Form F-10 (File No. 333-283616), as may be amended and supplemented.
1


DOCUMENTS FILED AS PART OF THIS FORM 6-K
Exhibit
Number
Document Description
99.1
Unaudited Condensed Consolidated Interim Financial Statements for the period ended September 30, 2026.
99.2
Management’s Discussion and Analysis for the period ended September 30, 2026.
2


SIGNATURE
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
Seabridge Gold Inc.
(Registrant)
By: /s/ Gregory Martin
Name:Gregory Martin
Title: CFO
Date: November 12, 2026
3


EXHIBIT INDEX
Exhibit
Number
Document Description
99.1
Unaudited Condensed Consolidated Interim Financial Statements for the period ended September 30, 2026.
99.2
Management’s Discussion and Analysis for the period ended September 30, 2026.
4


imageb.jpg
UNAUDITED CONDENSED CONSOLIDATED INTERIM
FINANCIAL STATEMENTS
For the three and nine months ended September 30, 2026






















SEABRIDGE GOLD INC.
Condensed Consolidated Interim Statements of Financial Position
(Unaudited, expressed in thousands of Canadian dollars)
NotesSeptember 30,
2026
December 31,
2025
Assets
Current assets
Cash and cash equivalents$56,289 $117,528 
Amounts receivable and prepaid expenses10,241 4,482 
Investments in marketable securities14,809 8,750 
Assets held for distribution4- 83,388 
81,339 214,148 
Non-current assets
Other long-term assets and receivables84,061 171,528 
Mineral interests, property and equipment51,647,540 1,347,672 
Gold stream asset612,022 - 
Deferred income tax assets- 12,412 
Reclamation deposits722,040 22,089 
1,765,663 1,553,701 
Total assets$1,847,002 $1,767,849 
Liabilities and shareholders’ equity
Current liabilities
Accounts payable and accrued liabilities8$67,613 $17,565 
Loan payable969,940 - 
Lease obligations534 366 
Provision for reclamation liabilities72,025 3,044 
Liabilities held for distribution4- 19,908 
140,112 40,883 
Non-current liabilities
Secured note liabilities10536,883 598,517 
Deferred income tax liabilities34,912 - 
Lease obligations552 1,073 
Provision for reclamation liabilities72,811 2,405 
575,158 601,995 
Total liabilities715,270 642,878 
Shareholders’ equity111,131,732 1,124,971 
Total liabilities and shareholders’ equity$1,847,002 $1,767,849 
Subsequent events (Note 9), commitments and contingencies (Note 15)
The accompanying notes form an integral part of these unaudited condensed consolidated interim financial statements.




1


SEABRIDGE GOLD INC.
Condensed Consolidated Interim Statements of Operations and Comprehensive Income (Loss)
(Unaudited, expressed in thousands of Canadian dollars except common share and per common share amounts)
Three months ended September 30,Nine months ended September 30,
Notes2026202520262025
Gain on distribution of mineral properties4$- - $151,691 - 
Remeasurement of secured notes1016,177 (20,033)31,877 (23,871)
Corporate and administrative expenses14(5,833)(4,671)(21,915)(13,980)
Foreign exchange gain (loss)(765)(12,607)(17,778)17,574 
Remeasurement gain on loss of significant influence- - 7,333 - 
Other income - flow-through shares11- 8,177 - 14,400 
Interest income532 1,518 2,617 3,750 
Finance costs and other269 (143)(1,951)(432)
Income (loss) before income taxes10,380 (27,759)151,874 (2,559)
Income tax expense(3,677)(4,511)(34,312)(6,831)
Net income (loss)$6,703 $(32,270)$117,562 $(9,390)
Other comprehensive income (loss)
Items that will not be reclassified to Net income or loss
Remeasurement of secured notes10$9,013 $25,893 $49,441 $(7,782)
Change in fair value of marketable securities827 1,509 (2,349)2,778 
Tax impact(2,488)(7,193)(13,315)1,729 
Total other comprehensive income (loss)7,352 20,209 33,777 (3,275)
Total comprehensive income (loss)$14,055 $(12,061)$151,339 $(12,665)
Weighted average number of common shares outstanding
Basic11107,875,752102,328,754107,546,54299,621,923
Diluted11108,640,450102,328,754108,315,60399,621,923
Income (loss) per share
Basic11$0.06$(0.32)$1.09$(0.09)
Diluted11$0.06$(0.32)$1.09$(0.09)
The accompanying notes form an integral part of these unaudited condensed consolidated interim financial statements.
2


SEABRIDGE GOLD INC.
Condensed Consolidated Interim Statements of Changes in Shareholders’ Equity
(Unaudited, expressed in thousands of Canadian dollars except number of shares)
NotesNumber
of Shares
Share
Capital
Stock-based
Compensation Reserve
Contributed
Surplus
Deficit Accumulated Other
Comprehensive
Income (loss)
Total
Equity
As at December 31, 2025106,554,091$1,377,773 $7,362 $39,484 $(271,062)$(28,586)$1,124,971 
Share issuance:
Interest expense paid in shares10698,56425,322 - - - - 25,322 
At-The-Market offering11759,22236,560 - - - - 36,560 
RSUs/DSUs settled1167,976860 (860)- - - - 
Share issuance costs-(792)- - - - (792)
Deferred tax on share issuance costs-213 - - - - 213 
Stock-based compensation11-- 5,869 - - - 5,869 
Other comprehensive income-- - - - 33,777 33,777 
Distribution of Courageous Lake net assets to shareholders4-- - - (211,750)- (211,750)
Net income-- - - 117,562 - 117,562 
As at September 30, 2026108,079,853 $1,439,936 $12,371 $39,484 $(365,250)$5,191 $1,131,732 
As at December 31, 202491,912,919$1,051,755 $4,198 $39,484 $(217,890)$(34,529)$843,018 
Share issuance:
Bought deal and private placement, net of costs8,180,000 136,600 ----136,600 
Private placement111,380,000 29,026 ----29,026 
Interest expense paid in shares10895,817 18,702 ----18,702 
At-The-Market offering111,439,49938,314 ----38,314 
RSUs/DSUs settled34,000578 (578)---- 
Share issuance costs-(1,829)----(1,829)
Deferred tax on Share issuance costs-2,083 ----2,083 
Stock-based compensation11--3,520 ---3,520 
Other comprehensive loss-- - - - (3,275)(3,275)
Net loss----(9,390)-(9,390)
As at September 30, 2025103,842,235 $1,275,229 $7,140 $39,484 $(227,280)$(37,804)$1,056,769 
The accompanying notes form an integral part of these unaudited condensed consolidated interim financial statements.
3


SEABRIDGE GOLD INC.
Condensed Consolidated Interim Statements of Cash Flows
(Unaudited, expressed in thousands of Canadian dollars)
Three months ended September 30,Nine months ended September 30,
2026202520262025
Operating Activities
Net income (loss)$6,703 $(32,270)$117,562 $(9,390)
Adjustment for non-cash items:
Gain on distribution of mineral properties- - (151,691)- 
Remeasurement (gain) loss on secured notes(16,177)20,033 (31,877)23,871 
Unrealized foreign exchange (gain) loss925 13,143 19,366 (17,941)
Remeasurement gain on loss of significant influence- (7,333)- 
Other income - flow-through shares- (8,177)- (14,400)
Stock-based compensation1,686 1,049 5,869 3,520 
Income tax expense3,677 4,511 34,312 6,831 
Other non-cash items(278)(224)355 1,052 
Adjustment for cash items:
Environmental rehabilitation disbursements(375)(1,032)(655)(1,299)
Changes in working capital items:
Amounts receivable and prepaid expenses683 (398)638 242 
Accounts payable and accrued liabilities (1,619)1,259 492 161 
Net cash used in operating activities(4,775)(2,106)(12,962)(7,353)
Investing Activities
Mineral interests, property and equipment(90,200)(52,864)(145,035)(88,250)
Cash distributed related to the Courageous Lake spin-out- - (10,000)- 
Payment to BC Hydro- - - (54,373)
Other4 - (220)(466)
Net cash used in investing activities(90,196)(52,864)(155,255)(143,089)
Financing Activities
Proceeds from loan facility69,940 - 69,940 - 
Share issuance, net of costs(24)36,430 35,767 204,666 
Payment of lease liabilities(148)(118)(360)(352)
Net cash from financing activities69,768 36,312 105,347 204,314 
Effects of exchange rate fluctuation on cash and cash equivalents
20 379 1,631 (583)
Increase (decrease) in cash and cash equivalents
(25,183)(18,279)(61,239)53,289 
Cash and cash equivalents, beginning of period
$81,472 $121,383 $117,528 $49,815 
Cash and cash equivalents, end of period$56,289 $103,104 $56,289 $103,104 
The accompanying notes form an integral part of these unaudited condensed consolidated interim financial statements.
4


SEABRIDGE GOLD INC.
Notes to the condensed consolidated interim financial statements
As at and for the three and nine months ended September 30, 2026 and 2025
(Unaudited, tabular amounts expressed in thousands of Canadian dollars, unless otherwise noted)
1. Reporting entity
Seabridge Gold Inc. comprises Seabridge Gold Inc. (“Seabridge” or the “Company”) and its subsidiaries, KSM Mining Inc., Seabridge Gold (Yukon) Inc., Seabridge Gold Corp., SnipGold Corp., and Snowstorm Exploration (LLC), and is a Company engaged in acquiring, exploring, and advancing mineral properties, with an emphasis on gold resources, located in Canada and the United States of America. The Company was incorporated under the laws of British Columbia, Canada on September 14, 1979 and continued under the laws of Canada on October 31, 2002. Its common shares are listed on the Toronto Stock Exchange trading under the symbol “SEA” and on the New York Stock Exchange under the symbol “SA”. The Company is domiciled in Canada and the address of its registered office is 10th Floor, 595 Howe Street, Vancouver, British Columbia, Canada V6C 2T5 and the address of its corporate office is 106 Front Street East, 4th Floor, Toronto, Ontario, Canada M5A 1E1.

On June 3, 2026, the Company completed the spin-out of its 100%-owned Courageous Lake Gold Project, located in the Northwest Territories of Canada, into a separate publicly listed company, Valor Gold Corp. (“Valor”). The transaction was completed through a plan of arrangement, pursuant to which the shares of the Company’s wholly-owned subsidiary, Seabridge Gold (NWT) Inc., which held the Courageous Lake Project, were transferred to Valor and Valor shares were distributed to Seabridge shareholders. The Company announced the spin-out in December 2025, and shareholders approved the transaction on May 22, 2026. As at December 31, 2025, the assets and liabilities associated with the Courageous Lake Project were classified as held for distribution in accordance with IFRS 5, Non-current Assets Held for Sale and Discontinued Operations. These assets and liabilities were derecognized upon completion of the transaction. Further details are provided in Note 4.

2. Basis of preparation
a)Statement of compliance
These unaudited condensed consolidated interim financial statements were prepared in accordance with IAS 34, Interim Financial Reporting, as issued by the International Accounting Standards Board (“IASB”). The accounting policies applied in these interim financial statements are consistent with those used in the Company's annual audited consolidated financial statements for the year ended December 31, 2025, except for the adoption of amendments to IFRS 9 “Financial Instruments” and IFRS 7 (Note 3) and the accounting policy adopted for the distribution of non-cash assets to shareholders (Note 4).

These condensed consolidated interim financial statements should be read in conjunction with the Company’s audited annual consolidated financial statements. They do not include all of the information required for a complete set of financial statements prepared in accordance with International Financial Reporting Standards (“IFRS”) as issued by the International Accounting Standards Board. However, selected explanatory notes are included to explain events and transactions that are significant to an understanding of the changes in the Company’s financial position and performance since the last annual financial statements. These condensed consolidated interim financial statements were authorized for issue by the Company’s board of directors on November 12, 2026.

b)Significant accounting judgments, estimates and assumptions

The preparation of these condensed consolidated interim financial statements requires management to make judgments, estimates and assumptions that affect the reported amounts of assets and liabilities as at the date of the condensed consolidated interim financial statements and reported amounts of income and expenses during the three and nine months ended September 30, 2026. The areas involving significant judgments, estimates and assumptions have been set out in Note 4 of the Company's annual audited consolidated financial statements for the year ended December 31, 2025.
5


Significant judgments, estimates and assumptions arising from the Valor spin-out transaction and the gold stream asset are described below.
The fair value of the net assets distributed to shareholders in connection with the distribution of Valor Gold Corp. shares on June 3, 2026 was determined using a market-based approach based on comparable transactions. Judgment was required in determining representative transactions to arrive at the estimated fair value. In making this estimate, management made certain assumptions about a market participant’s view of fair value based on the relative size, scale, stage and complexity of the Courageous Lake Project. The valuation incorporates significant unobservable inputs and is classified as a Level 3 fair value measurement within the fair value hierarchy.
The fair value of the gold stream asset (Note 6) was determined using a Monte Carlo valuation methodology. The inputs and assumptions used in determining the fair value were derived from observable market data where possible. Judgment was required in selecting the discount rate used to determine the fair value of the gold stream asset, and estimation uncertainty exists in the measurement of the gold stream asset at the initial recognition and at the period end. The valuation incorporates significant unobservable inputs and is classified as a Level 3 fair value measurement within the fair value hierarchy.
3. Material accounting policy information
a)Amended IFRS standard effective January 1, 2026
On May 30, 2024, the IASB issued narrow scope amendments to IFRS 9 “Financial Instruments” and IFRS 7. The amendments include clarification of the date of initial recognition or derecognition of financial liabilities, including financial liabilities that are settled in cash using an electronic payment system. The amendments also introduce additional disclosure requirements to enhance transparency regarding investments in equity instruments designated at FVOCI and financial instruments with contingent features. The application of these amendments did not have a material impact on the Company’s condensed consolidated interim financial statements.
b)Accounting pronouncements issued but not yet effective
On April 9, 2024, the IASB issued IFRS 18 “Presentation and Disclosure in the Financial Statements” (“IFRS 18”) replacing IAS 1. IFRS 18 introduces categories and defined subtotals in the statement of profit or loss, disclosures on management-defined performance measures, and requirements to improve the aggregation and disaggregation of information in the financial statements. As a result of IFRS 18, amendments to IAS 7 were also issued to require that entities use the operating profit subtotal as the starting point for the indirect method of reporting cash flows from operating activities and also to remove presentation alternatives for interest and dividends paid and received. Similarly, amendments to IAS 33 “Earnings per Share” were issued to permit disclosure of additional earnings per share figures using any other component of the statement of profit or loss, provided the numerator is a total or subtotal defined under IFRS 18. IFRS 18 is effective for annual and interim reporting periods beginning on or after January 1, 2027, and is to be applied retrospectively, with early adoption permitted. The Company expects adoption to change the classification of income and expenses and introduce operating profit (loss) and profit (loss) before financing and income taxes subtotals in its statement of profit or loss. In the statement of cash flows, operating profit (loss) will become the starting point for determining cash flows from operating activities under the indirect method, and interest paid, including capitalized interest, will be reclassified from investing to financing activities. The Company does not currently use management-defined performance measures requiring disclosure under IFRS 18. Adoption is not expected to affect the recognition or measurement of amounts in the financial statements.
4. Completion of Valor Gold distribution
In 2002, the Company purchased a 100% interest in the Courageous Lake gold project from Newmont Canada Limited and Total Resources (Canada) Limited. The Courageous Lake gold project consists of mining leases located in the Northwest Territories of Canada.
6


On June 3, 2026, the Company completed the previously announced spin-out of the Courageous Lake Project through a plan of arrangement. Prior to completion of the arrangement, the Courageous Lake Project was held through Seabridge Gold (NWT) Inc., a wholly-owned subsidiary of the Company. Pursuant to the arrangement, the shares of Seabridge Gold (NWT) Inc. were transferred to Valor, resulting in Valor acquiring ownership of the Courageous Lake Project.
As part of the arrangement, Seabridge shareholders received 0.511 common shares of Valor for each common share of Seabridge held.
Immediately prior to completion of the arrangement, the Company acquired a gold stream interest on the Courageous Lake Project for $4.9 million. The gold stream asset is accounted for separately from the distribution and is discussed in Note 6. The fair value of the gold stream asset was determined using a Monte Carlo valuation methodology and was measured at $13.6 million on initial recognition. The difference between the $4.9 million paid for the gold stream asset prior to the distribution of Valor and the fair value determined using the Monte Carlo valuation methodology was recognized immediately on distribution of Valor and is included in the gain on distribution.
The transaction was accounted for in accordance with IFRIC 17, Distributions of Non-cash Assets to Owners.
The fair value of Valor Gold Corp. was determined using a market-based approach based on comparable market transactions for other projects of similar size, scale, stage and complexity to the Courageous Lake Project. The fair value of Valor at the date of distribution was determined to be $211.8 million, resulting in a gain on distribution of $151.7 million.
Upon completion of the arrangement, the Company derecognized the assets and liabilities associated with the Courageous Lake Project and recognized the following gain on distribution:
($000s)June 3,
2026
Carrying value of Courageous Lake mineral interests83,657 
Carrying value of deferred tax liability(19,998)
Cash distributed in connection with the distribution of Courageous Lake net assets to shareholders10,000 
Net assets distributed73,659 
Fair value of distribution to shareholders211,750 
Fair value of the gold stream asset13,600 
Gain on distribution of mineral properties151,691 
7


5. Mineral interests, property and equipment
($000s)Mineral interests
Construction in progress 1
Property & equipment
Right-of-use assets 2
Total
Cost
As at January 1, 2025802,590 277,979 175,722 2,728 1,259,019 
Additions104,751 77,174 45 565 182,535 
Reclassification to assets held for distribution(83,389)- - - (83,389)
As at December 31, 2025823,952 355,153 175,767 3,293 1,358,165 
Additions113,014 188,734 489 300 302,537 
Disposals- - - (293)(293)
As at September 30, 2026936,966 543,887 176,256 3,300 1,660,409 
Accumulated Depreciation
As at January 1, 2025- - 6,192 1,403 7,595 
Depreciation expense 3
- - 2,475 423 2,898 
As at December 31, 2025- - 8,667 1,826 10,493 
Depreciation expense 3
- - 2,133 243 2,376 
As at September 30, 2026- - 10,800 2,069 12,869 
Net Book Value
As at December 31, 2025823,952 355,153 167,100 1,467 1,347,672 
As at September 30, 2026936,966 543,887 165,456 1,231 1,647,540 
1.Additions during the current period include $86.2 million of BC Hydro Basic Transmission Extension ("BTE") costs, transferred from other long-term assets and receivables to construction in progress. In the third quarter of 2026, BC Hydro substantially completed the Treaty Creek Terminal and related interconnection work. The BTE costs are directly attributable to establishing the electrical connection for the Company's power infrastructure at the KSM Project.
2.Right-of-use assets consist of property and equipment related to assets leased and accounted for under IFRS 16
3.Depreciation expense related to camps, equipment, and right-of-use assets associated with the KSM construction is capitalized to construction in progress

8


Mineral interests, property and equipment additions by project are as follows.
($000s)Balance at January 1, 2026AdditionsBalance at September 30, 2026
Mineral interests
Construction in progress 1
Property & equipmentRight-of-use assetsTotal Additions
Additions
KSM1,176,836 103,918 188,734 441 300 293,393 1,470,229 
Bronson Corridor101,001 6,115 - 48 - 6,163 107,164 
Snowstorm42,055 1,298 - - - 1,298 43,353 
3 Aces36,793 991 - - - 991 37,784 
Other Mineral Properties869 692 - - - 692 1,561 
Corporate611 - - - - - 611 
Total1,358,165 113,014 188,734 489 300 302,537 1,660,702 
1.Additions during the current period include $86.2 million of BC Hydro BTE costs.
($000s)Balance at January 1, 2025AdditionsReclassification to assets held for distributionBalance at December 31, 2025
Mineral interestsConstruction in progressProperty & equipmentRight-of-use assetsTotal Additions
Additions
KSM1,023,292 75,760 77,174 45 565 153,544 - 1,176,836 
Courageous Lake82,609 780 - - - 780 (83,389)- 
Bronson Corridor81,140 19,861 - - - 19,861 - 101,001 
Snowstorm40,538 1,517 - - - 1,517 - 42,055 
3 Aces30,058 6,735 - - - 6,735 - 36,793 
Other Mineral Properties771 98 - - - 98 - 869 
Corporate611 - - - - - - 611 
Total1,259,019 104,751 77,174 45 565 182,535 (83,389)1,358,165 
Continued exploration of the Company’s mineral properties is subject to certain lease payments, project holding costs, rental fees and filing fees.
6. Gold stream asset
On June 3, 2026, in connection with the completion of the Valor Gold spin-out transaction, the Company acquired a gold stream interest on the Courageous Lake Project pursuant to a Gold Purchase Agreement ("Agreement") with Valor Gold Corp.
Under the Agreement, the Company is required to purchase 10% of refined gold production from the Courageous Lake Project. Delivery and purchase commence upon the achievement of commercial production and are required for quarters in which the average quarterly gold price equals or exceeds US$4,000 per ounce. For each ounce delivered, the Company will pay US$4,000 per ounce. The Agreement has an initial term of 40 years and may be extended in accordance with its terms.
Immediately prior to completion of the arrangement, the Company acquired the gold stream asset for $4.9 million. The fair value of the gold stream asset at the date of distribution was determined using a Monte Carlo valuation methodology and was measured at $13.6 million on June 3, 2026. The Company concluded that the gold stream is a financial instrument within the scope of IFRS 9 and is measured at fair value through profit or loss, with fair value remeasured at each reporting period.
As at September 30, 2026, the gold stream asset was remeasured to an estimated fair value of $12.0 million, compared with $13.6 million at initial recognition on June 3, 2026. For the three months ended September 30, 2026, the Company recognized an unrealized fair value gain of $0.3 million. For the nine months ended September 30, 2026, the Company recognized an unrealized fair value loss of $1.9
9


million, partially offset by an unrealized foreign exchange gain of $0.3 million, resulting in a net decrease of $1.6 million. These amounts are recognized in the condensed consolidated statement of operations.
Significant valuation inputs include forecast gold production, future gold prices, long-term inflation rate assumptions, the contractual stream terms, the timing of expected cash flows and discount rates determined using weighted average cost of capital that incorporates the probability of the mine going into production. The valuation incorporates significant unobservable inputs and is classified as a Level 3 fair value measurement within the fair value hierarchy.
Significant assumptions and inputs used in the valuation were as follows:

Key inputs and assumptionsSeptember 30,
2026
June 3,
2026
Forecast attributable production (thousands of ounces)580580
Expected production commencement20332033
Gold spot price per ounce$4,157$4,437
Gold price volatility17.8 %17.5 %
Discount rate39.5 %37.7 %

Sensitivity Analysis:
For the fair value of the gold stream, reasonably possible changes at the reporting date to one of the significant inputs, holding other inputs constant, would have the following effects:
Key Inputs Inter-relationship between significant inputs and fair value measurementIncrease
(decrease)
(millions)
Key observable inputs The estimated fair value would increase (decrease) if:
•Long-term gold prices
•Future gold prices were 10% higher
$2.5 
•Future gold prices were 10% lower
$(2.3)
•Discount rates
•Discount rates were 10% higher
$(6.8)
•Discount rates were 10% lower
$19.0 
Key unobservable inputs
•Forecasted production
•Gold production volumes were 10% higher
$1.2 
•Gold production volumes were 10% lower
$(1.2)
7. Provision for reclamation liabilities
The provision for reclamation liabilities represents the estimated present value of future costs to rehabilitate disturbed areas and meet environmental closure obligations. As at September 30, 2026, the provision for reclamation liabilities amounted to $4.8 million (December 31, 2025 - $5.4 million), of which $2.0 million is classified as current and $2.8 million as long‑term.

The movements in the provision for reclamation liabilities during the nine months ended September 30, 2026 were as follows:

($000s)September 30,
2026
September 30,
2025
Beginning of period5,449 7,292 
Reclamation expenditures(655)(1,299)
Accretion41 115 
End of period4,836 6,108 

10


The provision is measured using present value of future cash flows. The expected timing of cash outflows required to settle the obligations is over the next three years. The nominal discount rate used to calculate the present value of the reclamation obligations was 2.7% at September 30, 2026 (December 31, 2025 - 2.6%).

As at September 30, 2026, the Company has placed a total of $22.0 million (December 31, 2025 - $22.1 million) on deposit with financial institutions or with government regulators that are pledged as security against current and future reclamation liabilities. The deposits are recorded on the condensed consolidated interim statements of financial position as reclamation deposits. As at September 30, 2026, and December 31, 2025, the Company also had $10.0 million of uncollateralized surety bonds in support of environmental closure cost obligations related to KSM.
8. Accounts payable and accrued liabilities
($000s)September 30,
2026
December 31,
2025
Trade payables28,085 13,047 
Trade accruals38,600 2,939 
Non-trade payables and other accrued liabilities928 1,579 
67,613 17,565 
Included in trade accruals at September 30, 2026 is $38.4 million related to the KSM Project, primarily for construction, development, engineering and feasibility study activities.
9. Loan facility
During the third quarter of 2026, the Company entered into an unsecured non-revolving loan agreement with a strategic investor providing for a loan facility of up to US$100.0 million. The facility bears interest at 7% per annum, is available through December 31, 2026 and may be used to fund the Company's working capital requirements and capital expenditures related to the KSM Project. Amounts drawn under the loan facility are due on or before December 31, 2026. Subject to the terms of the loan agreement, the Company may elect to settle all or a portion of the principal and accrued interest in cash, common shares, or a combination thereof. Any issuance of common shares is subject to TSX approval and applicable TSX pricing requirements. The issue price of any shares cannot be lower than the minimum price permitted under TSX requirements and, in all cases, is determined based on the greater of 92.5% of the 20-day volume weighted average trading price and the minimum price permitted by the TSX. The number of shares issuable is further limited such that the lender and its affiliates cannot own more than 4.9% of the Company's outstanding common shares following the issuance. To the extent these requirements are not satisfied, settlement must be made in cash.
As at September 30, 2026, the Company had drawn $69.9 million (US$50.0 million) under the loan facility. On November 2, 2026, subsequent to quarter-end, the Company drew down the remaining US$50.0 million, fully utilizing the US$100.0 million facility.
10. Secured note liabilities
i.2022 Secured Note
Refer to Note 12 of the Company's December 31, 2025 consolidated financial statements for the terms of the 2022 Secured Note.
During the second quarter of 2026, the 2022 Secured Note agreement was amended, extending the Silver Financing Put exercise date to March 24, 2028 and increasing the put exercise amount by 6.5% to US$247.1 million.
To satisfy the interest payment on the 2022 Secured Note, the Company issued 419,138 common shares, in respect of the interest incurred during the nine months ended September 30, 2026 (nine months ended September 30, 2025 - 771,648 common shares).
11


Based on the evaluation of the likelihood of various scenarios regarding the timeline for securing project financing, the Company continues to assume that the Silver Financing Put would become exercisable on March 24, 2028.
Due to the expectation that the Silver Financing Put embedded within the 2022 Secured Note will be exercisable on March 24, 2028, the Company is required to record the present value of the contractual cash flows that will be payable, if such value exceeds the fair value of the 2022 Secured Note calculated using the discounted cash flow with a Monte Carlo simulation. As of September 30, 2026, the discounted value of the contractual cash flows related to the Silver Financing Put embedded within the 2022 Secured Note exceeded the fair value of the 2022 Secured Note leading the Company to record the higher amount. In contrast, as at December 31, 2025, the fair value of the 2022 Secured Note was higher than the discounted value of the Silver Financing Put's contractual cash flows.
During the three and nine months ended September 30, 2026, the carrying value of the 2022 Secured Note decreased by $18.1 million and $10.8 million, respectively (three and nine months ended September 30, 2025 - increased by $5.5 million and decreased by $3.7 million, respectively). The following key inputs and assumptions were used in the determination of fair value:
Key inputs and assumptionsSeptember 30,
2026
December 31,
2025
Forecast silver production in thousands of ounces166,144166,144
Silver spot price per ounce 1
$60.73$71.99
Royalty rate75%75%
Risk-free rate5.6%4.8%
Credit spread6.0%4.6%
Share price volatility60%60%
Silver royalty discount factor16.9%14.5%
1.The metal prices used in the model are based on the quoted forward prices where available and adjusted for forward risk-free rates and cost of carry beyond quoted future forward prices.
The movements in the carrying value of the 2022 Secured Note during the three and nine months ended September 30, 2026 were as follows:

($000s)Three months ended September 30,Nine months ended September 30,
2026202520262025
Carrying value beginning of the period341,608 304,508 334,330 313,766 
Change in fair value (gain) loss through profit and loss(22,373)2,265 (2,719)5,629 
Change in fair value (gain) loss through other comprehensive income (loss)3,760 (3,715)(19,808)962 
Foreign currency translation (gain) loss553 6,966 11,745 (10,332)
Total change in carrying value(18,060)5,516 (10,782)(3,741)
Carrying value end of the period323,548 310,025 323,548 310,025 
Sensitivity Analysis:
As at September 30, 2026, the fair value of the 2022 Secured Note was recorded as the fair value of the Silver Financing Put, therefore the fair value is not sensitive to changes in silver price forward curve or the forecasted silver production. However, if the silver price forward curve or forecasted silver production were 38.0% higher, or the discount rate were 2.4% lower, the fair value of the 2022 Secured Note would exceed the fair value of the Silver Financing Put, and the higher fair value of the 2022 Secured Note would be recorded.
12


As at September 30, 2026, the fair value of the 2022 Secured Note would increase by $4.8 million if the discount rate was 1% lower and the fair value would decrease by $4.7 million if the discount rate was 1% higher.

ii. 2023 Secured Note
Refer to Note 12 of the Company's December 31, 2025 consolidated financial statements for the terms of the 2023 Secured Note.
During the second quarter of 2026, the 2023 Secured Note agreement was amended, extending the NSR Financing Put exercise date to March 24, 2028 and increasing the put exercise amount by 6.5% to US$164.8 million.
To satisfy the interest payment on the 2023 Secured Note for the nine months ended September 30, 2026, the Company issued 279,426 common shares in settlement of interest incurred during the period. Interest incurred during the nine months ended September 30, 2025 was accrued as Deferred Interest. The Interest Deferral Amount was settled on December 29, 2025 through the issuance of 774,841 Seabridge common shares.
Based on the evaluation of the likelihood of various scenarios regarding the timeline for securing project financing, the Company continues to assume that the NSR Financing Put would become exercisable on March 24, 2028.
Due to the expectation that the NSR Financing Put embedded within the 2023 Secured Note will be exercisable on March 24, 2028, the Company is required to record the present value of the contractual cash flows that will be payable, if such value exceeds the fair value of the 2023 Secured Note calculated using the discounted cash flow with a Monte Carlo simulation. As of September 30, 2026, the discounted value of the contractual cash flows related to the NSR Financing Put embedded within the 2023 Secured Note exceeded the fair value of the 2023 Secured Note leading the Company to record the higher amount. In contrast, as at December 31, 2025, the fair value of the 2023 Secured Note was higher than the discounted value of the NSR Financing Put's contractual cash flows.
During the three and nine months ended September 30, 2026, the carrying value of the 2023 Secured Note decreased by $6.1 million and $50.9 million, respectively (three and nine months ended September 30, 2025 - increased by $1.8 million and $24.3 million, respectively). The following key inputs and assumptions were used in the determination of fair value:
Key inputs and assumptionsSeptember 30, 2026December 31,
2025
Forecast NSR:
Gold in thousands of ounces10,50010,500
Silver in thousands of ounces29,87629,876
Copper in millions of pounds19,32219,322
Molybdenum in millions of pounds152152
Metal spot prices 1
Gold per ounce$4,188.75$4,307.95
Silver per ounce$60.73$71.99
Copper per pound$6.54$5.63
Molybdenum per pound$33.57$21.50
NSR Rate1.25%1.25%
Risk-free rate5.6%4.8%
Credit spread6.0%4.6%
Share price volatility60%60%
NSR royalty discount factor16.9%14.5%
13


1.The metal prices used in the model are based on the quoted forward prices where available and adjusted for forward risk-free rates and cost of carry beyond quoted future forward prices.
The movements in the carrying value of the 2023 Secured Note during the three and nine months ended September 30, 2026 were as follows:

($000s)Three months ended September 30,Nine months ended September 30,
2026202520262025
Carrying value beginning of the period219,466271,346264,187 248,786 
Change in carrying value (gain) loss through profit and loss6,19617,768(29,158)25,114 
Change in carrying value (gain) loss through other comprehensive income (loss)(12,773)(22,178)(29,633)6,820 
Foreign currency translation (gain) loss447 6,175 7,939 (7,609)
Total change in carrying value(6,130)1,765 (50,852)24,325 
Carrying value end of the period213,335 273,111 213,335 273,111 
Sensitivity Analysis:
As at September 30, 2026, the fair value of the 2023 Secured Note was recorded as the fair value of the NSR Financing Put, therefore the fair value is not sensitive to changes in metal prices forward curve or the forecasted metal production. However, if the metal price forward curve or forecasted metal production were 37.5% higher, or the discount rate were 2.2% lower, the fair value of the 2023 Secured Note would exceed the fair value of the NSR Financing Put, and the higher fair value of the 2023 Secured Note would be recorded.
As at September 30, 2026, the fair value of the 2023 Secured Note would increase by $3.5 million if the discount rate was 1% lower and the fair value would decrease by $3.5 million if the discount rate was 1% higher.

11. Shareholders’ equity
The Company is authorized to issue an unlimited number of preferred shares and common shares with no par value. No preferred shares have been issued or were outstanding at September 30, 2026 or December 31, 2025.
The Company manages its capital structure and makes adjustments to it, based on the funds available to the Company, in order to support the acquisition, exploration and development of mineral properties. The Board of Directors does not establish quantitative return on capital criteria for management, but rather relies on the expertise of the Company’s management to sustain future development of the business.
The properties in which the Company currently has an interest are in the pre-operating stage, as such the Company is dependent on external financing to fund its activities. In order to carry out the planned exploration and pay for administrative costs, the Company anticipates spending its existing working capital and raising additional amounts as needed.
Management reviews its capital management approach on an ongoing basis and believes that this approach, given the relative size of the Company, is reasonable. There were no changes in the Company’s approach to capital management during the nine months ended September 30, 2026. The Company considers its capital to be share capital, stock-based compensation, contributed surplus and deficit. The Company is not subject to externally imposed capital requirements.
a)Equity financing
During the first quarter of 2025, the Company established an At-The-Market ("ATM") equity program permitting the issuance of up to US$100 million of common shares from time to time. During the first
14


quarter of 2026, the Company issued 759,222 common shares under the ATM program at an average selling price of $48.15 per share for net proceeds of $35.8 million, representing the remaining capacity available under the program.
During the nine months ended September 30, 2025, the Company issued 1,439,499 common shares under the ATM program at an average selling price of $26.62 per share for net proceeds of $37.5 million.
During the second quarter of 2025, the Company also issued 1,200,000 flow-through common shares at $25.38 per share for gross proceeds of $30.5 million. A flow-through premium liability of $6.2 million was recognized on issuance. During the nine months ended September 30, 2025, the Company incurred $30.5 million of qualifying exploration expenditures and recognized $6.2 million of the flow-through premium in other income.
On September 18, 2025, the Company issued 180,000 flow-through common shares at $33.52 per common share for aggregate gross proceeds of $6.0 million. The Company committed to renounce its ability to deduct qualifying exploration expenditures for the equivalent value of the gross proceeds of the flow-through financing and transfer the deductibility to the purchasers of the flow-through shares. The effective date of the renouncement was December 31, 2025. At the time of issuance of the flow-through shares, $1.3 million premium was recognized as a liability on the consolidated statements of financial position. By September 30, 2025, the Company had incurred $6.0 million of qualifying exploration expenditures and $1.3 million of the flow-through premium in other income.

b) Share-based payments
The Company provides share‑based compensation to officers and employees in the form of restricted share units (“RSUs”) and to the directors as deferred share units (“DSUs”) in accordance with the Seabridge Gold Inc. Restricted Share Unit and Deferred Share Unit Plan (the “Plan”). All awards granted under the Plan are equity‑settled and are accounted for in accordance with IFRS 2 – Share‑based Payment.
RSUs
RSUs are granted to employees and officers of the Company and vest in accordance with the vesting conditions specified in the applicable award agreements. RSUs may contain service‑based, performance‑based, and market‑based vesting conditions. Upon vesting, each RSU entitles the holder to receive one common share of the Company, net of any applicable withholding taxes. Unvested RSUs are forfeited if the vesting conditions are not satisfied.
DSUs
DSUs are granted to directors of the Company and vest in accordance with the terms of the applicable award agreements. DSUs are not payable until the holder ceases to provide services to the Company, after which the holder is entitled to receive one common share of the Company for each DSU held. DSUs do not carry voting rights, and dividend equivalents declared on the Company’s common shares are credited to the holder in the form of additional DSUs prior to settlement.

15


The following tables summarize the changes in RSUs and DSUs:
RSUsDSUsTotal
Outstanding balance January 1, 2026888,896 82,900 971,796 
Granted45,5193,651 49,170 
Settled(67,976)- (67,976)
Expired/forfeited(9,505)- (9,505)
Outstanding balance September 30, 2026856,934 86,551 943,485 
RSUsDSUsTotal
Outstanding balance January 1, 2025782,801 54,500 837,301 
Granted195,100 40,400 235,500 
Settled(80,173)(12,000)(92,173)
Expired/forfeited(8,832)- (8,832)
Outstanding balance December 31, 2025888,896 82,900 971,796 
Fair value measurement and expense recognition
The grant‑date fair value of RSUs and DSUs is based on the quoted market price of the Company’s common shares on the grant date.
During the nine months ended September 30, 2026, the Company granted 9,200 RSUs with a weighted average grant-date fair value of $47.54 per unit. No DSUs were granted during the period. During the nine months ended September 30, 2025, the Company granted 10,000 DSUs with a weighted average grant-date fair value of $19.56 per unit. No RSUs were granted during the period.
During the second quarter of 2026, the Company granted 36,319 RSUs and 3,651 DSUs in connection with the completion of the Valor Gold Corp. spin-out transaction. The additional units were issued pursuant to the adjustment provisions of the Company's Plan to preserve the economic value of outstanding awards following the distribution of Valor shares to Seabridge shareholders. The adjustment was intended to place holders of outstanding RSUs and DSUs in a substantially equivalent economic position immediately before and after completion of the spin-out
For RSUs that include market‑based vesting conditions, the grant‑date fair value incorporates the effect of such conditions using an appropriate valuation methodology consistent with IFRS 2. Market‑based vesting conditions are not adjusted for actual outcomes and are reflected in compensation expense regardless of whether the market‑based conditions are ultimately satisfied.
For RSUs that include service‑based and non‑market performance vesting conditions, the grant‑date fair value is not adjusted for these conditions. Compensation expense for these awards is recognized over the applicable vesting period and is adjusted for actual forfeitures and the achievement of non‑market performance conditions.
The grant‑date fair value of DSUs is recognized as compensation expense over the applicable service period specified in the award agreement.
Share‑based compensation expense recognized in profit or loss was:
($000s)Nine months ended September 30,
20262025
RSUs5,538 3,166 
DSUs331 355 
5,869 3,520 
16


c) Basic and diluted net income per common share
Basic and diluted earnings attributable to common shareholders for the three and nine months ended September 30, 2026 were $6.7 million and $117.6 million, respectively (three and nine months ended September 30, 2025 - loss of $32.3 million and $9.4 million, respectively).
Net income per share has been calculated using the weighted average number of common shares and common share equivalents issued and outstanding during the period. Potentially dilutive instruments are included in diluted earnings per share using the treasury method when applicable. The following table details the weighted average number of outstanding common shares for the purpose of computing basic and diluted income (loss) per common share for the following periods:

(Number of common shares)Three months ended September 30,Nine months ended September 30,
2026202520262025
Basic weighted average shares outstanding107,875,752 102,328,754 107,546,542 99,621,923 
Weighted average shares dilution adjustments
Restricted share units719,026- 722,392- 
Deferred share units45,671- 46,669- 
Diluted weighted average shares outstanding108,640,450 102,328,754 108,315,603 99,621,923 

12. Cash flow items
Adjustment for other non-cash items within operating activities:
($000s)Three months ended September 30,Nine months ended September 30,
2026202520262025
Loss from investment in associate- 97 - 295 
Remeasurement of Gold Stream(280)- 1,899 - 
Depreciation8 19 46 59 
Finance costs, net14 39 41 115 
Effects of exchange rate fluctuation on cash and cash equivalents(20)(379)(1,631)583 
(278)(224)355 1,052 
13. Fair value of financial assets and liabilities
Fair value is the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date. The fair value hierarchy establishes three levels to classify the inputs to valuation techniques used to measure fair value.
Level 1: Inputs are quoted prices (unadjusted) in active markets for identical assets or liabilities.
Level 2: Inputs are quoted prices in markets that are not active, quoted prices for similar assets or liabilities in active markets, inputs other than quoted prices that are observable for the asset or liability (for example, interest rate and yield curves observable at commonly quoted intervals, forward pricing curves used to value currency and commodity contracts, volatility measurements used to value option contracts and observable credit default swap spreads to adjust for credit risk where appropriate), or inputs that are derived principally from or corroborated by observable market data or other means.
Level 3: Inputs are unobservable (supported by little or no market activity).
The fair value hierarchy gives the highest priority to Level 1 inputs and the lowest priority to Level 3 inputs.
17


During the second quarter of 2026, the Company determined the fair value of the Valor distribution at $211.8 million. The fair value measurement was classified as Level 3 within the fair value hierarchy due to the use of significant unobservable inputs. The valuation was determined using a market-based approach based on comparable market transactions involving projects of similar size, scale, stage and complexity to the Courageous Lake Project.
The Company’s financial assets and liabilities measured at fair value were as follows:
($000s)September 30, 2026
Carrying AmountLevel 1Level 2Level 3Fair Value
Assets
Investment in marketable securities14,809 14,809 - - 14,809 
Gold stream asset12,022 - - 12,022 12,022 
26,831 14,809 - 12,022 26,831 
Liabilities
Secured note liabilities536,883 - - 536,883 536,883 

($000s)December 31, 2025
Carrying AmountLevel 1Level 2Level 3Fair Value
Assets
Investment in marketable securities8,750 8,750 - - 8,750 
Liabilities
Secured note liabilities598,517 - - 598,517 598,517 
The following table summarizes the changes in the carrying amount of the Level 3 gold stream asset during the nine months ended September 30, 2026:
($000s)September 30, 2026
Initial recognition13,600 
Fair value gain (loss) recognized in profit or loss(1,578)
Fair value end of the period12,022 
The carrying values of cash and cash equivalents, receivables included in amounts receivable and prepaid expenses, accounts payable and accrued liabilities, and the loan facility approximate their fair values due to the short-term maturity of these financial instruments.
The Company’s financial risk exposures and the impact on the Company’s financial instruments are summarized below:
Credit Risk
The Company’s credit risk is primarily attributable to short-term deposits, receivables included in amounts receivable and prepaid expenses. The Company has no significant concentration of credit risk arising from operations. The short-term deposits consist of Canadian Schedule I bank guaranteed notes, with terms up to one year but are cashable in whole or in part with interest at any time to maturity, for which management believes the risk of loss to be remote. Management believes that the risk of loss with respect to financial instruments included in amounts receivable and prepaid expenses to be remote.
18


Liquidity Risk
As at September 30, 2026, the Company had cash and cash equivalents of $56.3 million (December 31, 2025 - $117.5 million) and current financial liabilities of $138.1 million (December 31, 2025 - $17.9 million). Except for the secured note liabilities, the loan facility, lease obligations and the reclamation obligations, the Company’s financial liabilities primarily have contractual maturities of 30 days and are subject to normal trade terms. The Company’s ability to fund its operations and capital expenditures and other obligations as they become due is dependent upon market conditions. The Company’s approach to managing liquidity risk is to maintain sufficient cash resources and access to financing to meet obligations as they become due, which includes reducing or deferring non-discretionary expenditures if required, including early works and other activities necessary to advance the KSM project, and other discretionary activities at the Company’s exploration projects
In the third quarter of 2026, the Company entered into a US$100.0 million loan facility, of which US$50.0 million was drawn at September 30, 2026 and an additional US$50 million was drawn subsequent to the quarter-end on November 2, 2026 (Note 9). Amounts drawn under the loan facility are due on or before December 31, 2026. Subject to the terms of the loan agreement, the Company may elect to settle all or a portion of the principal and accrued interest in cash, common shares, or a combination thereof. Any issuance of common shares is subject to TSX approval and applicable TSX pricing requirements. The issue price of any shares cannot be lower than the minimum price permitted under TSX requirements and, in all cases, is determined based on the greater of 92.5% of the 20-day volume weighted average trading price and the minimum price permitted by the TSX. The number of shares issuable is further limited such that the lender and its affiliates cannot own more than 4.9% of the Company's outstanding common shares following the issuance. To the extent these requirements are not satisfied, settlement must be made in cash. The ultimate form of settlement will depend on the Company’s share price, capital structure, and the shareholdings of the loan facility holder at the date of settlement.
With respect to the secured notes (Note 10), and following an amendment to the secured note liabilities during the second quarter of 2026, as at September 30, 2026, the Company has assessed that the Silver and NSR Financing Puts (“Financing Puts”) are expected to become exercisable on March 24, 2028, and are not exercisable prior to that date. If exercised, the Company would be required to pay US$247.1 million, plus accrued and unpaid interest related to the 2022 Secured Note, and US$164.8 million, plus accrued and unpaid interest related to the 2023 Secured Note. The Company has the option to settle amounts due on exercise of the Financing Puts through the issuance of common shares, subject to ownership limitations, or in cash. The ultimate form of settlement will depend on the Company’s share price, capital structure, and the noteholder’s shareholdings at the date of settlement. As the Financing Puts are not exercisable until March 2028, the Company expects the Financing Puts will become exercisable at that time and no determination regarding the settlement method has been made as at September 30, 2026.
The following table details the Company’s expected remaining contractual cash flow requirements for its financial liabilities on repayment or maturity periods. The amounts presented are based on the contractual undiscounted cash flows and may not agree with the carrying amounts in the condensed consolidated interim statements of financial position.
($000s)Less than 1 year1-3 years3-5 yearsGreater than 5 yearsTotal
2022 Secured Note including interest 20,814 41,629 41,629 219,476 323,548 
2023 Secured Note including interest13,876 27,752 27,752 143,956 213,336 
Lease obligation227 1,043 435 396 2,101 
Loan payable 71,348 - - - 71,348 
106,265 70,424 69,816 363,828 610,333 
If the Company is unable to settle all or a portion of the amounts payable for the loan facility or the Secured Notes in shares, the Company would be required to seek external sources of financing to fund any payments due, such as obtaining replacement royalty arrangements or raising additional capital, which would be subject to market conditions that are outside the Company’s control. The significant judgments relate to the availability and timing of external funding on acceptable terms, the effect of the Company’s
19


share price, the effect of foreign exchange rates, applicable approval and ownership limitations on its ability to settle the loan facility or Secured Notes in common shares, and management’s ability to reduce or defer discretionary expenditures as necessary.

Market Risk
(a) Interest Rate Risk
Interest rate risk is the risk that the future cash flows of a financial instrument or its fair value will fluctuate because of changes in market interest rates. The secured note liabilities (Note 10) bear interest at a fixed rate of 6.5% per annum and the loan facility (Note 9) bears interest at a fixed rate of 7% per annum. The Company’s current policy is to invest excess cash in Canadian bank guaranteed notes (short-term deposits). The short-term deposits can be cashed in at any time and can be reinvested if interest rates rise.
(b) Foreign Currency Risk
The Company’s functional currency is the Canadian dollar and major purchases are transacted in Canadian and US dollars. The secured note liabilities, the loan facility and the related interest payments are denominated in US dollars. The Company has the option to pay interest on the secured notes in either in cash or in shares while interest on the loan facility is accrued. The Company also funds certain operations, exploration and administrative expenses in the United States on a cash call basis using US dollar cash on hand or converted from its Canadian dollar cash. Management believes the foreign exchange risk derived from currency conversions is not significant to its operations and has not entered into any foreign exchange hedges. As at September 30, 2026, the Company had cash and cash equivalents, reclamation deposits, gold stream asset, accounts payable, the loan facility and secured notes that are in US dollars.
(c) Investment Risk
The Company has investments in other publicly listed exploration companies, including an equity investment in Paramount Nevada Gold, which are classified as investments in marketable securities. These shares were received primarily as option payments in connection with certain exploration properties the Company owns or has sold. In addition, the Company holds $8.4 million in a gold exchange-traded receipt, which is also recorded as an investment in marketable securities on the condensed consolidated interim statements of financial position. These investments are subject to a high degree of risk due to their nature; however, the related carrying amounts are not considered significant to the Company.
14. Corporate and administrative expenses
($000s)Three months ended September 30,Nine months ended September 30,
Note2026202520262025
Employee compensation1,458 1,412 5,361 4,827 
Stock-based compensation111,686 1,049 5,869 3,520 
Professional fees1,163 924 2,520 1,985 
Other general and administrative1,526 1,286 3,528 3,648 
Expenses related to assets held for distribution- 4,637 - 
5,833 4,671 21,915 13,980 
During the nine months ended September 30, 2026, the Company incurred $4.6 million of costs related to the spin-out transaction.
20


15. Commitments and contingencies
Payments due by years
($000s)Total20262027-20282029-20302031-2032
2022 Secured Note – interest 114,009 5,204 41,629 41,629 25,547 
2023 Secured Note – interest 76,005 3,469 27,752 27,752 17,032 
Capital expenditure commitments25,230 25,230 - - - 
Loan payable 71,348 71,348 - - - 
Mineral interests8,356 200 2,106 2,373 3,677 
Lease obligation2,101 227 1,043 435 396 
297,049 105,678 72,530 72,189 46,652 
Prior to maturity, the 2022 Secured Note and the 2023 Secured Note bear interest at 6.5% per annum, or US$14.6 million and US$9.8 million per annum, respectively. Interest is payable quarterly in arrears. The Company can elect to satisfy interest payments in cash or by delivering common shares, subject to certain limitations described in Note 10. To date, the Company has elected to deliver common shares.
21


imageb.jpg


MANAGEMENT’S DISCUSSION AND ANALYSIS

For the three and nine months ended September 30, 2026


CONTENTS
COMPANY OVERVIEW
2
OUTLOOK
4
DISCUSSION OF PROJECTS
7
MINERAL INTERESTS
14
FINANCIAL RESULTS
15
FINANCIAL POSITION SUMMARY
18
LIQUIDITY AND CAPITAL RESOURCES
19
COMMITMENTS AND CONTINGENCIES
22
SECURED NOTES LIABILITIES
23
CONTROLS AND PROCEDURES
27
SUSTAINABILITY
28
SHARES ISSUED AND OUTSTANDING
28
RECENT ACCOUNTING PRONOUNCEMENTS
28
CRITICAL ACCOUNTING ESTIMATES
29
RISKS AND UNCERTAINTIES
29
CAUTIONARY STATEMENT ON FORWARD-LOOKING STATEMENTS
29

Page 1


SEABRIDGE GOLD INC.
MANAGEMENT’S DISCUSSION AND ANALYSIS
This management’s discussion and analysis (“MD&A”) of Seabridge Gold Inc. (“Seabridge” or the “Company”) and its subsidiary companies, dated November 12, 2026, is intended to supplement and complement the unaudited condensed consolidated interim financial statements and related notes as at and for the three and nine months ended September 30, 2026. It should be read in conjunction with the Company's audited annual consolidated financial statements and annual management’s discussion and analysis for the year ended December 31, 2025, and the 2025 Annual Information Form filed on SEDAR+ at www.sedarplus.ca. Other corporate documents are also available on SEDAR+ and EDGAR, as well as the Company’s website www.seabridgegold.com.
This MD&A contains forward-looking statements that are subject to risks and uncertainties, as discussed in the "Cautionary Statement On Forward-Looking Statements" in this MD&A. Readers are cautioned not to place undue reliance on forward-looking statements. As the Company has no operating projects at this time, its ability to carry out its business plan rests with its ability to sell interests in projects or to secure equity and other financings. All dollar figures are in Canadian dollars unless otherwise stated. Figures in some tables may not add due to rounding.
The unaudited condensed consolidated interim financial statements for the three and nine months ended September 30, 2026, and the comparative periods have been prepared by the Company in accordance with IAS 34, Interim Financial Reporting, as issued by the International Accounting Standards Board (“IASB”).
COMPANY OVERVIEW
Seabridge Gold Inc. is engaged in acquiring, exploring, and advancing mineral properties, with an emphasis on gold resources, located in Canada and the United States of America. The Company’s objective is to provide its shareholders with exceptional leverage to rising gold prices, while also offering additional exposure to copper through the significant copper resources it has acquired and discovered.
The Company’s strategy is to increase its mineral resources through exploration, rather than to develop and operate mines on its own. The Company intends to sell projects or participate in joint ventures with major mining companies as projects advance toward production. Since inception in 1999, Seabridge has acquired interests in numerous gold projects situated in North America with its principal project being the KSM property located in British Columbia. The KSM Project contains one of the world’s largest endowments of gold and copper mineral reserves and mineral resources. The Company also holds a 100% interest in the Bronson Corridor Project (formerly known as the Iskut Project) in British Columbia, the 3 Aces Project in Yukon, the Snowstorm Project in Nevada, exploration rights to the Felch Project (formerly referred to as the Michigan Project) in Michigan under an option agreement with Keweenaw Land Association, and the recently acquired 100% interest in the Sierra Madre Project (formerly referred to as the Slaughterhouse Project) in Wyoming. Although focused on gold exploration, the Company has made significant copper discoveries, in particular, at KSM and Bronson Corridor.
Seabridge’s common shares trade in Canada on the Toronto Stock Exchange ("TSX") under the symbol “SEA” and in the United States on the New York Stock Exchange under the symbol “SA”.







Page 2




Page 3


THIRD QUARTER 2026 HIGHLIGHTS
•Substantially completed an aggressive field work season at the KSM Project. Significant works included completion of the 13-kilometer Upper Treaty Creek Access Road, part of KSM's permanent infrastructure providing access to the saddle area of the Mitchell Treaty Tunnels ("MTT").
•At KSM, major field programs supporting feasibility study ("FS") work were completed across planned infrastructure areas in the Treaty and Mitchell Valleys, including 11,398 metres of drilling at 177 locations for geotechnical and metallurgical studies and 211 excavation pits for rock and soil characterization.
•Continued preparatory works for a feasibility study on the KSM Project largely focused on trade-off studies and other evaluations aimed at establishing a final project description for the execution of the study. Completion of a feasibility study is targeted for the end of 2027.
•Comprehensive environmental monitoring programs and modeling studies advanced in Q3 at KSM to strengthen the environmental data supporting the future feasibility study, permitting and joint venture discussions.
•Announced substantial completion and successful energization of the Treaty Creek Terminal ("TCT") on August 27, 2026, a significant milestone in the development of infrastructure supporting KSM. The terminal, located adjacent to Highway 37, approximately 2 kilometers north of the entrance to the KSM Project, represents a key component of the electrical infrastructure required to support future construction and operations.
•On July 20, 2026, the Company arranged an unsecured non-revolving loan agreement with a strategic investor providing for a loan facility of up to US$100 million. The facility bears interest at 7% per annum, compounded monthly, is available through December 31, 2026 and will be used to fund the Company’s working capital requirements and capital expenditures related to the KSM Project through the balance of 2026. The Company may elect to settle all or a portion of the principal and accrued interest in cash, common shares, or a combination thereof, subject to certain restrictions.
•The reconsideration of KSM’s substantially started designation (“SSD”) was advanced by British Columbia’s Environmental Assessment Office (“EAO”). KSM received its SSD on July 24, 2024. The SSD was subsequently challenged by the Tsetsaut Skii km Lax Ha (“TSKLH”) before the Supreme Court of British Columbia and the Court’s ruling on June 8, 2026 required the EAO to commence a reconsideration of the SSD following an additional 90-day consultation period with the TSKLH. The 90-day consultation period concluded on September 28, 2026. On September 22, 2026, Seabridge was advised by letter from the EAO that following the conclusion of the consultation, the EAO will provide Seabridge Gold with an opportunity to respond to the TSKLH submissions. The EAO will then draft a report regarding the substantial start reconsideration in light of the court findings and any relevant new information received. An opportunity to review that draft report will be provided to Seabridge, TSKLH, and other Indigenous Groups. The EAO will then make a recommendation to the decision-maker, and the decision-maker will reconsider the substantial start determination.
•Subsequent to quarter end, Seabridge acquired a 100% interest in properties and data of the Sierra Madre Project (referred to as the Slaughterhouse Project in the announcement of the acquisition) in southern Wyoming for US$300,000 and additional milestone payments of up to US$2.55 million upon successful completion of specific goals. Orogen Royalties Inc. (“Orogen”) retains a 2.5% net smelter return (“NSR”) royalty on the purchased claims (subject to a partial buy down) and a 0.5% to 1% NSR royalty within a broader area of mutual interest. This purchase includes 163 US mining claims, geophysical survey results and geological mapping, sampling and prospect evaluation. The Sierra Madre Project has been evaluated over the past several years by Orogen.



Page 4


OUTLOOK
The Company continues its pursuit of a joint venture agreement on the KSM Project with a senior mining company partner that has technical, financial, and social capabilities to support development of the Project. The KSM Project includes multiple deposits and development scenarios that provide a joint venture partner flexibility in the design of the Project.
Planned activities through the balance of 2026 on the KSM project include:
•Continuation of FS activities, including engineering, to support the initiation of a FS which remains targeted for completion by the end of 2027. Engineering studies work includes the completion of trade off studies and preparation of the design criteria for the proposed FS.
•Environmental monitoring and technical studies covering activities required to prepare for the FS, and future permitting applications.
•Maintaining site camps, site operations, permits and social outreach programs, including Indigenous partner engagements.
Other Project works that have been largely concluded for the season and were successful in achieving the planned 2026 work scope, include:
•The FS site investigation included the most significant geotechnical program ever completed at the KSM site, with drilling programs in the Treaty and Mitchell valleys, and in the proposed process and tailings management area ("PTMA"). The program completed a total of 177 drill holes and 211 test pits, along with numerous geophysical programs. Drillholes provided geotechnical and hydrogeology data, as well as samples for metallurgical and geochemical testing.
•Completion of 13 kilometers of Upper Treaty Creek Access Road (“UTCAR”) to provide access to the site of the MTT saddle portal access. BC Hydro has substantially completed work on the TCT, a key component of the system required to provide power from the Northwest Transmission Line ("NTL”) for use during construction and operations.
At the Bronson Corridor Project, Seabridge's exploration program is focused on better defining new targets through enhanced surface geochemical sampling and geological mapping on untested and underexplored targets on the property. Additional evaluation of the historical core was undertaken to better understand mineral distribution and relationship to intrusive centers. Results from these ongoing evaluations are currently pending and will help guide future exploration activities.
Executing this more limited program has also resulted in a pause of the voluntary reclamation program at the Johnny Mountain Mine.
Limited exploration works are being completed at our 3 Aces and Snowstorm Projects. On our newly acquired Felch Project, the focus in 2026 is expanding geochemical data over the property to identify and refine targets for future drilling.
At the end of the third quarter, the Company held $56.3 million in cash and cash equivalents to fund current liabilities of $67.6 million and ongoing project and corporate costs. In addition, at September 30, 2026 the remaining available capacity under the unsecured non-revolving loan facility to fund planned works was US$50 million (C$70 million). On November 2, 2026, subsequent to quarter-end, the Company drew down the remaining US$50.0 million, fully utilizing the US$100.0 million facility.
DISCUSSION OF PROJECTS
KSM PROJECT
The KSM Project is located in northwest British Columbia, Canada, in a region generally known as the “Golden Triangle”. The Golden Triangle includes operating mines and many development and exploration projects. KSM is one of the world's largest undeveloped gold and copper projects as measured by mineral

Page 5


reserves and mineral resources.1 The KSM Project received its environmental assessment approvals from the federal, provincial and Nisga’a Lisims governments in 2014, relating to the mining and processing of 2.3 billion tonnes of ore from four of the KSM mineral deposits. The SSD, received in July 2024, made these environmental assessment approvals no longer subject to expiry; however, the Court ordered the SSD to be reconsidered after further consultation with the TSKLH. After reconsideration, if the EAO confirms that the KSM Project was substantially started, the environmental assessment approvals remain and are not subject to expiry.
On April 30, 2026, the Province of British Columbia (the "Province") designated Seabridge's KSM Project as a provincial priority project. The designation is designed to advance strategic, job-creating developments across British Columbia. Inclusion on the priority project list provides KSM with dedicated provincial permitting coordination and support, which is expected to streamline and expedite additional permits for the Project.
Recognition of KSM as a provincial priority project reflects the quality of the work completed to date and the value KSM represents for British Columbia and Canada. Dedicated permitting efforts support the significant work invested by Seabridge, our First Nation partners, local communities and government agencies. The Province’s decision reflects KSM’s scale, long‑term economic potential, and alignment with the objectives of the Look West strategy, which focuses on delivering major projects, strengthening economic security, and supporting the responsible development of British Columbia’s natural resources.
Site Activities And Development
Consistent with seasonal conditions, site activities were at full planned capacities throughout Q3 2026, with project management, contractors and support staff to execute works across all planned scopes. All three owned camp locations and two third-party locations being used to support the field season were operational. A strong focus on safety and environmental compliance was maintained throughout the quarter.
Upper Treaty Creek Access Road (“UTCAR”): Construction of UTCAR was fully engaged during the quarter with completion of 11.6 kilometers of the 13-kilometer route. Subsequent to quarter end, the full scope was successfully completed on budget. The UTCAR was constructed by a joint venture between the Treaty Creek Limited Partnership, owned by the Nisga'a and Tahltan Nations, and the Lemare Group. Completion of this permanent site infrastructure provides access into the Treaty Valley all the way to the saddle location to support construction of the MTT.
Treaty Creek Terminal: Work on BC Hydro's Treaty Creek Terminal ("TCT") for construction power also continued during the quarter and was substantially completed, with the facility being energized at the end of August 2026. BC Hydro contractors completed works on controls, communications and testing while also advancing on-site finishing of the yard and associated buildings. The TCT represents a key component of the electrical infrastructure required to support future construction and, subject to expansion, operations at KSM.
Drilling Programs: Extensive site investigation program continued through the quarter. Drill programs were conducted within both the Mitchell and Treaty Valleys, focused on geotechnical information for the FS. As at September 30, 2026, 97% of the planned holes were completed and at the date of this MD&A, 100% have been completed. Test pitting to better define soil and bedrock characterization within the footprint of the tailings management facility and other significant infrastructure locations continued throughout the quarter and the full planned scope of 211 test pits is now complete.




[1] Statements made comparing KSM’s size to other mineral deposits globally are made against, and based on, mineral resource and mineral reserve estimates disclosed by all publicly traded mining and exploration companies in North America, the United Kingdom, Australia, New Zealand and Singapore.

Page 5


FS Activities
During Q3 2026, the technical services team focused on working with various consultants on trade-off studies to finalize the project description upon which the FS will be based. Trade-off studies assessed throughput rates, infrastructure configurations, plant layouts and mine designs related to ore and waste sequencing. In addition, work continued on a schedule for the initiation of, and the execution and completion of the FS. To support this work and align scopes, various technical sessions were held to better define current information and planning assumptions related to mine and process design and various infrastructure components.
Metallurgical test work in support of the FS was fully in process through the third quarter. Work continues across a number of labs on composites and other samples to optimize grind size and flowsheet layouts. Work to date has improved the Company’s confidence that the FS process design can be improved relative to that which was utilized in the 2022 pre-feasibility study.
Expenditures
Expenditures related to project development, started in 2021 and continued through 2026, are illustrated below:
(in thousands of Canadian dollars)Capital expenditures
Payments/ Deposits to BC Hydro 1
Capitalized borrowing costs 2
Total
Cost
As at December 31, 2023336,371 92,720 34,138 463,229 
Additions44,715 14,000 32,855 91,570 
As at December 31, 2024381,086 106,720 66,993 554,799 
Additions37,927 54,373 36,844 129,144 
As at December 31, 2025419,013 161,093 103,837 683,943 
Additions72,914 - 25,456 98,370 
BTE costs86,393 (86,393)- - 
As at September 30, 2026578,320 74,700 129,293 782,313 
1.In 2022, the Company entered into a Facilities Agreement with British Columbia Hydro and Power Authority ("BC Hydro") covering the design and construction of a switching station by BC Hydro to supply construction phase hydro-sourced electricity to the KSM Project. Pursuant to the Facilities Agreement and amendments thereto, as at September 30, 2026, the Company has completed all $161.1 million in contracted payments. Of the $161.1 million paid, $86.4 million was BC Hydro Basic Transmission Extension ("BTE") costs. The remaining $74.7 million was placed as a deposit as security for BC Hydro's system reinforcement expenditures that are required to make the construction power available at the TCT. The refund of all or part of this deposit is subject to the Company meeting certain performance obligations under the Facilities Agreement.
2.During the nine months ended September 30, 2026, construction in progress additions at KSM included $25.5 million of capitalized borrowing costs (nine months ended September 30, 2025 - $25.6 million). Costs capitalized during the comparative period were net of $0.5 million of interest income earned on temporary investments of the borrowed funds.
During the nine months ended September 30, 2026, the Company incurred $72.9 million in expenditures that were capitalized.









Page 6


At KSM, expenditures related to technical and engineering, fieldwork, and environmental and social programs for the nine months ended September 30, 2026 are summarized in the following table:

(in thousands of Canadian dollars)Nine months ended September 30, 2026
Payroll2,757 
Technical, engineering, and fieldwork26,356 
Environmental and social14,039 
Other holding or property299 
Total43,451 
Project Description
In 2014, the KSM Project received its environmental assessment approvals from the federal, provincial and Nisga’a Lisims governments, relating to the mining and processing of 2.3 billion tonnes of ore from four of the KSM mineral deposits. After the Court ordered reconsideration of the SSD, if the EAO concludes for a second time that the KSM Project is substantially started, these environmental assessment approvals will not be subject to expiry. In addition to its environmental approvals, the Company currently holds significant federal and provincial permits related to the project, which allow for exploration, drilling activities, as well as early construction programs, such as road and camp construction. Additional permits and permit amendments (including Environmental Assessment Certificate amendments) will still need to be obtained prior to the project going into full production, including production from the East Mitchell deposit.
The design of the KSM Project as approved in our Environmental Assessment Certificate (“EAC”), includes the MTT, two 22 km long parallel tunnels that connect the mine sites to the milling and processing area. The Company currently holds a number of authorizations required for the MTT, including a Mines Act permit M-245 (“M-245”), which allows excavation from each of the three portal locations to the first crosscut, located up to 300 metres from each portal, and a License of Occupation (“LoO”) for the MTT route. The LoO provides KSM Mining Inc. ("KSMCo"), the Company's wholly-owned subsidiary which owns the KSM Project, with the right to occupy the area in which it intends to construct and operate the MTT for the purposes of constructing and operating the MTT. The Chief Gold Commissioner has also issued a Conditional Mineral Reserve (“CMR”) that applies to the MTT route. The Company has applied for an amendment to its M-245 permit to authorize the construction and operation of the MTT over its full length. Approval of this amendment has been delayed by the Mines Ministry, citing a legal action commenced challenging whether the CMR applies to third-party-owned mineral claims within the area of the CMR. See Litigation section below for further details. Once the MTT is constructed, the Company plans to convert the LoO into a statutory right-of-way.
Updated Mineral Resource Estimate
During the first quarter of 2026, an updated Mineral Resource estimate for the KSM Project was announced (see News Release dated March 31, 2026). Based on this mineral resource update, the KSM Project hosts Measured and Indicated Mineral Resources totaling 95.5 million ounces of gold, 21 billion pounds of copper, 460 million ounces of silver and 837 million pounds of molybdenum (6.3 billion tonnes grading 0.48 g/t gold, 0.15% copper, 2.3 g/t silver and 61ppm molybdenum). In addition, Inferred Mineral Resources total 84 million ounces of gold, 43 billion pounds of copper, 570 million ounces of silver and 606 million pounds of molybdenum (8.5 billion tonnes grading 0.31 g/t gold. 0.23% copper, 2.1 g/t silver and 32.5 ppm molybdenum).2
Resources are reported inclusive of those Mineral Resources that were converted to Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

[2] Measured and Indicated Resources and Inferred Resources estimates were prepared by Henry Kim, P. Geo, an independent Qualified Person, with an effective date of March 30, 2026. For details of the underlying key assumptions, parameters and methods see the Company’s news release of March 31, 2026.
Page 7



2022 Preliminary Feasibility Study And Preliminary Economic Assessment
In 2022, the Company completed a preliminary feasibility study (“2022 PFS”), which included a preliminary economic assessment (“2022 PEA”)3. A copy of the Technical Report setting forth the details of the 2022 PFS and the 2022 PEA, including the underlying assumptions and projections, can be viewed on the Company’s website (www.seabridgegold.com) by selecting “KSM” from the dropdown “Projects” tab.
The 2022 PFS envisages an open-pit mine operation that is scheduled to operate for 33 years. Ore delivery to the mill increases from an initial 130,000 tpd to 195,000 tpd in Year 3. Average life of mine strip ratio is projected to be approximately 1:1. Over the entire 33-year mine life, ore would be fed to a flotation and gold extraction mill. The flotation plant is designed to produce a gold/copper/silver concentrate for transport by truck to a nearby seaport at Stewart, B.C. for shipment to Pacific Rim smelters. Metallurgical projections supported by extensive metallurgical testing, project a copper concentrate with an average copper grade of 24% and a high gold (64 g/t) and silver (177g/t) content, making it readily saleable. A separate molybdenum concentrate and gold-silver doré would also be produced at the KSM processing facility.
Mineral Reserves for the KSM Project are based on open pit mining of the Mitchell, East Mitchell and Sulphurets deposits. Waste to ore cut-offs were determined using a net smelter return (“NSR”) for each block in the model. NSR is calculated using prices and process recoveries for each metal, accounting for all off-site losses, transportation, smelting and refining charges. Metal prices of US$1,300 per ounce gold, US$3.00 per pound copper, US$20 per ounce silver and US$9.70 per pound molybdenum and a foreign exchange rate of 0.79 US dollar per Canadian dollar have been used in the NSR cut-off calculations.
Total Proven and Probable Mineral Reserves for the KSM Project are 47.3 million ounces of gold, 7,320 million pounds of copper, 160 million ounces of silver and 385 million pounds of molybdenum (2,292 million tonnes grading 0.64 g/t Au, 0.14% Cu, 2.2 g/t Ag and 76 ppm Mo)4. Mineral Resources are reported inclusive of Mineral Reserves.
The projected economic results of the 2022 PFS based on metal prices prevailing at that time are set forth below:











[3] Measured and Indicated Resources and Inferred Resources estimates were prepared by Henry Kim, P. Geo, an independent Qualified Person, with an effective date of March 30, 2026.
[4] The Technical Report setting forth the 2022 PFS and 2022 PEA dated August 8, 2022 was prepared by a team of independent Qualified Persons made up of Hassan Ghaffari, P.Eng.,Henry Kim, P. Geo., Jianhui (John) Huang, Ph.D., P.Eng, James H. Gray, P. Eng., Derek Kinakin, M.Sc., P.Geo, P.G., David Willms, P. Eng., Neil Brazier, P.Eng, Rolf Schmidt, P.Geo., and Ross Hammett, PhD., P. Eng.




Page 8


Amounts expressed in US dollars2022 PFS Base Case
Metal Prices:
Gold ($/ounce)1,742
Copper ($/pound)3.53
Silver ($/ounce)21.90
Molybdenum ($/lb)18.00
US$/Cdn$ Exchange Rate:0.77
Cost Summary:
Operating costs per ounce of gold produced (years 1 to 7) 1
$35
Operating costs per ounce of gold produced (life of mine) 1
$275
Total cost per ounce of gold produced (inclusive of all capital and closure) 1
$601
Initial capital (billions)$6.4
Sustaining capital (billions)$3.2
Unit operating cost (US$/tonne)$11.36
Pre-Tax Results:
Net Cash Flow (billions)$38.6
NPV @ 5% discount rate (billions)$13.5
Internal rate of return20.1%
Payback period (years)3.4
Post-Tax Results:
Net Cash Flow (billions)$23.9
NPV @ 5% discount rate (billions)$7.9
Internal rate of return16.1%
Payback period (years)3.7
1.On a by-product basis
The results of the 2022 PEA are a stand-alone mine plan that was undertaken to evaluate a potential future expansion of the KSM mine to the copper-rich Iron Cap and Kerr deposits after the 2022 PFS mine plan has been completed. The 2022 PEA is primarily an underground block cave mining operation supplemented with a small open pit and is planned to operate for an additional 39 years with a peak mill feed production of 170,000 t/d. The 2022 PEA demonstrates that KSM is a potential multigenerational mining project with the flexibility to vary the metal output.

Page 9


Litigation Related To The Ksm Project
KSM Project SSD
On November 22, 2024, the TSKLH, an indigenous group claiming indigenous rights and title over the KSM Project, filed a petition against the Province seeking judicial review of the SSD for the KSM Project. TSKLH sought a declaration that the EAO failed to fulfill its duty to consult TSKLH in respect of the SSD and an order quashing the SSD on the basis that the EAO failed to fulfill its duty to consult, the EAO failed to discharge its duty of procedural fairness and/or that the SSD was unreasonable. On November 29, 2024, the SkeenaWild Conservation Trust (“SCT”) and Southeast Alaska Indigenous Transboundary Commission (“SEITC”) filed a second petition against the EAO and KSMCo, also seeking an order quashing the SSD on the basis that the SSD was unreasonable. During the third quarter of 2025, SEITC withdrew from the proceedings.
On June 8, 2026, the Supreme Court of British Columbia (the "Court") issued its decision on these two petitions. The Court found that the EAO had not satisfied its duty to consult TSKLH with respect to the SSD. The Court ruled that the EAO must undertake additional consultation with the TSKLH providing TSKLH a period of 90-days for TSKLH to provide written submissions on whether the project was substantially started, after which the EAO must reconsider the SSD. The 90-day period ended September 28, 2026. The Court also dismissed the second petition that was filed by SCT, although the parties disagree as to whether the Court made a determination as to the reasonableness of the SSD. The parties to the legal action applied to the Court to settle its orders on the reasonableness arguments and the scope of the consultation required of TSKLH. A Court hearing took place on October 14, 2026 to resolve these issues, and the Court’s decision confirming its orders (the “Confirming Decision”) is yet to be released. TSKLH and SCT have filed notices of appeal to preserve their rights of appeal until the Court issues its Confirming Decision on these issues. The Company has filed cross appeals to preserve its rights in case the appeals proceed, and the Crown filed a cross appeal of the TSKLH decision.
The KSM Project environmental assessment certificate (“EAC”) is unaffected by the Petitions or the Court decision. However, the EAC expires unless the KSM Project was substantially started as of July 29, 2026. A substantially started determination for the KSM Project can be made after the July 29, 2026 date; in respect of other projects a substantially started determination (as of the expiry date) was made several months after the relevant expiry date.
Since the EAO gave TSKLH until September 28, 2026, to make written submissions, the EAO will give the Company an opportunity to respond to those submissions and the EAO will need a reasonable period of time after receiving those submissions to undertake any further consultation with TSKLH, to consider the submissions, to reconsider their original decision and to prepare a new decision. The EAO’s reconsidered decision is not expected until after the Court releases the Confirming Decision, with the result that the reconsidered SSD may not be issued until late in the fourth Quarter of 2026. The EAO has also indicated that it will receive submissions from the Company concerning the KSM Project for the period after the original SSD up to July 29, 2026 and will allow other interested parties, including TSKLH, to comment on the new information. The Company has submitted information regarding the additional work completed at the KSM Project after the work considered in the initial SSD to support a stronger reconsidered decision. The Company believes the EAO will make a new substantially started determination as of July 29, 2026 based on all information provided to it by the Company and through consultation with Indigenous peoples and others. During the consultation and reconsideration process(es), the EAC has not expired; it only expires if the EAO’s ultimate determination is that the KSM Project was not substantially started as of July 29, 2026. The EAO previously decided the KSM Project was substantially started in July, 2024.
If the Company is unsuccessful in retaining its SSD after the processes described above, the EAC will expire. Based on the merits of the Company’s original application and the EAO’s thorough review and consultation process in respect of it, the Court ruling and the additional work completed on the KSM Project since the initial SSD, management considers that the probability of KSM not retaining the EAC is remote.
Page 10


Tudor Gold Litigation and MTT Authorizations
In July 2023, Tudor Gold Corp. (“Tudor”) requested the cancellation of KSM's LoO and Mines Act permit. Tudor claimed that the B.C. government did not have the authority to issue these and that they would destroy the value of Tudor's claims. The Mines Act permit authorizes limited MTT construction activities, including activities on claims held by Tudor, along the route of the MTT, and the LoO authorizes KSMCo to occupy the area of the MTT for construction and operation of the MTT, including on mineral claims held by Tudor. These authorizations were granted after a thorough regulatory process involving First Nations and Tudor's existing and previous joint venture partners.
In September 2023, the Company submitted a dismissal request for Tudor’s application to the Mines Ministry and the Ministry of Forests. In October 2023, Mines Ministry affirmed the Province’s authority to grant the LoO and the Mines Act permit. On November 17, 2023, the B.C. Ministry of Water, Land, and Resource Stewardship (“WLRS”) confirmed that the LoO was in good standing and there is no justification for canceling it.
In early 2024, the Mines Ministry advised the Company that the CMR prohibits interference with the MTT by any free miner, including Tudor. In several letters to the Chief Gold Commissioner (“CGC”) between December 2024 and April 2025, Tudor made multiple submissions asking the CGC to decide the dispute between Tudor and KSMCo and to cancel the CMR. In May 2025, the CGC determined that she did not have jurisdiction to decide the dispute, refused to cancel the CMR and included a statement in her determination that the CMR applied to Tudor. On July 14, 2025, Tudor filed a Notice of Appeal in Court against the CGC and KSMCo, appealing the CGC’s decision not to decide the dispute and the CGC’s statement that the CMR applies to Tudor. On March 17, 2026, after conceding that the CGC’s decision was correct, Tudor abandoned this appeal.
On September 22, 2025, Tudor filed a Notice of Civil Claim in the Court against the Province, seeking a ruling that the CMR does not apply to it, alleging misrepresentation by the Mines Ministry concerning Tudor’s rights as a mineral claims holder, asserting the CMR amounts to an expropriation by the Province of Tudor’s mineral claims, and asserting that the Province does not have the authority to grant Seabridge rights to use areas within Tudor’s mineral claims, amongst other things. On October 3, 2025, Tudor filed a Petition (the “LoO Petition”) against WLRS and KSMCo seeking judicial review of the September 2024 WLRS decision to grant the renewed 2024 LoO across portions of the Treaty Creek Property.
In April 2026, the Province filed its response to the Notice of Civil Claim brought against the Province by Tudor. In its response, the Province affirms its right under provincial legislation to grant the CMR and the LoO. The Province’s response notes that a mineral claim does not confer property rights; ownership of minerals requires further authorizations and authorized work by a mineral claims holder. The Province’s response further argues that Tudor knew that the CMR, LoO and Mines Act permit were in place when Tudor acquired its interest in its claims and that Tudor should have prudently investigated the implications of this fact. Finally, the Province notes that the Civil Claim by Tudor is statute-barred under the Limitations Act, any right of action having expired. The Company has applied to become a party to this Civil Claim in order to defend its interests and is awaiting a court hearing.
The Province delivered its records in respect of its decision on the LoO Petition in April 2026, however, the Province has not delivered its Response to the Petition. In July 2026, Seabridge delivered its Response to Petition and the Province’s Affidavit, addressing Tudor’s claims in the LoO Petition.
On April 10, 2026, the Company received a letter from the Mines Ministry advising that the decision to issue permit amendments for the construction and operation of the MTT over their full length was being delayed. The decision maker reviewing the permit amendment application referenced the Civil Claim commenced by Tudor challenging whether the CMR applies to Tudor's mineral claims. The Mines Ministry had previously confirmed on multiple occasions in writing that the CMR applies to Tudor's mineral claims. The decision-maker has advised the Company that he is not going to make a decision on its permit amendment application until this legal issue relating to the application of the CMR is resolved. There are no plans to commence construction of the MTT until a FS Study has been completed.
KSMCo and the Company will continue to vigorously defend all challenges to its rights, licenses and permits.
Page 11


BRONSON CORRIDOR PROJECT
Bronson Corridor Project is an exploration property 40 kilometers from the KSM project in northwest British Columbia, Canada. Bronson Corridor has many features resembling KSM and it represents an opportunity to benefit from what we have learned at KSM to find one or more large gold-copper porphyry deposits in the highly prospective Golden Triangle region.
In 2023, the Company conducted a 17-drill hole, 19,500 metre drilling program at Bronson Corridor, integrating historical drilling, geochemistry and geophysical surveying programs. The work program was designed to test deeper copper-gold porphyry systems focused on the Bronson Slope mineral resource. Results of the 2023 program expanded the broad zones of sericite-pyrite-carbonate alteration associated with the Bronson Slope intermediate sulfidation epithermal deposit. In addition, the first drill program on the Snip North target in 2023 found a new porphyry mineral center. The discovery consists of the preserved upper parts of a copper-gold porphyry, with zonation from an upper intermediate sulfidation epithermal zone into an intense potassic altered porphyry system.
Regional geophysical surveys and surface geology work on the property point to a distinct structural feature that connects the Quartz Rise, Bronson Slope and Snip North targets. All the prospective copper-gold intrusions recognized on the property fall along this regional trend, and this observation has led the Company to envision a cluster of copper-gold deposits. The program in 2023 successfully tested the regional controls interpreted for the property, putting context to the alignment of Quartz Rise, Bronson Slope and Snip North.
In 2024, the Company expanded the large, intense hydrothermal system at Snip North that remains open down dip to the west and northwest. Results from the 2024 drill program established a continuous and extensive mineral system hosted in clastic and volcanoclastic wall rock, however, the source intrusion was never identified. Conclusions from the 2024 program indicated that a resource could be defined at Snip North and that it would provide valuable insights to apply across the property.
Drilling in 2025 at the Bronson Corridor Project was initiated at regular spacing to provide data to support a Mineral Resource estimation. The holes intersected wide intervals of wall rock hosted porphyry-style mineralization as well as higher level epithermal-style mineralization. The exploration program completed 23,855 metres of drilling in 24 drill holes with the goal of announcing a maiden copper-gold Mineral Resource at the Snip North target in 2026. At the close of 2025, it was determined that sufficient drilling was completed to proceed with a Mineral Resource estimation, although the limits of the system and the source intrusion were not defined.
Early in the second quarter of 2026, Seabridge published its inaugural Mineral Resource estimate for the Snip North Target, the second deposit discovered at the Bronson Corridor project. The maiden Inferred Mineral Resource totals 9.2 million ounces of gold, 28.3 million ounces of silver and 923 million pounds of copper (605.7 million tonnes grading 0.47 g/t gold, 0.07% copper and 1.5 g/t silver).
During the third quarter of 2026, geological crews were in the field completing soil and rock sampling in conjunction with geological mapping. The goal of this effort is to improve the historical geochemical data set using systematic sample distribution and modern analytical techniques that better detect porphyry mineral systems.
In conjunction with the surface sampling program, historical drill core across the Bronson Corridor was reviewed and prepared for an extensive core scanning effort which was completed during the quarter. Core scanning is designed to improve recognition of alteration mineralogy, refine structural models and develop thermal patterns in the altered rocks. Gathering this additional data from historical drill core is expected to direct future drilling at Bronson Slope.
Bronson Corridor lies in the traditional territory of the Tahltan Nation. The Tahltan Nation is developing a land use plan that encompasses parts of Bronson Corridor, including areas in which Mineral Resources lie. The Company has begun discussions with the Tahltan Nation in respect of its land use planning process to seek clarity on how the land use planning process may apply to Bronson Corridor.


Page 12



The Company spent $6.1 million in the nine months ended September 30, 2026 related to Bronson Corridor.
In addition to exploration work at Bronson Corridor, the Company spent $0.7 million in nine months ended September 30, 2026 on reclamation and closure activities at the Johnny Mountain mine site.
3 ACES PROJECT
3 Aces was acquired by Seabridge in March 2020. It consists of 1,734 claims covering 357 km² (35,700 ha) located in a road accessible part of southeastern Yukon. Historical work developed broad areas of gold-in-soil extending more than 20 kilometers and past drilling encountered extensive gold. The Company believes the characteristics of the 3 Aces project are indicative of an orogenic gold project consistent in formation with other orogenic gold deposits in the vicinity and around the world.
In 2024, at the 3 Aces Project, the Company completed an exploration program, including 7,600 metres of drilling to evaluate and prioritize resource expansion targets across the project. An updated 3-dimensional model was built that brought together results from the drilling and historical drill programs to indicate the likelihood of continuous mineralization between previously isolated historical deposits in the Central Core Area ("CCA"). The focus in 2025 was to extend known geological features that host gold in the CCA into covered areas. The Company is pursuing an exploration model that predicts gold is localized on second-order folds along the contact of phyllite and sandstone.
3 Aces has concentrated on compiling the exploration results during 2026. This effort is integrating new drilling, extensive till and rock sampling as well as external research into a comprehensive understanding, particularly across covered areas. Expanding the potential size of the mineral system around the identified zones continues to be our focus.
The Company spent $1.0 million in the nine months ended September 30, 2026 related to 3 Aces.
SNOWSTORM PROJECT
Snowstorm is located 15 kilometres north of the Turquoise Ridge mine on a blind extension of the prolific Getchell Trend in Nevada, U.S.A.
At Snowstorm, from 2022 through 2024, the Company evaluated the results of the previous drilling programs to understand the geology encountered and its relationship to host prospective gold mineralization. Research was conducted to evaluate new technologies that could assist in targeting gold concentrations. Access and permit conditions were reviewed for initiating more extensive exploration, including drilling.
In 2025, exploration at Snowstorm continued the evaluation of a Getchell-style gold deposit and the deployment of a new technology for the discovery of Getchell-style mineralization at Snowstorm. An Ambient Noise Tomography survey was completed during the first quarter of 2025 and integrated into the data set. This led to a comprehensive structural model on the property that was incorporated into an Artificial Intelligence ("AI") assisted targeting evaluation.
Ultimately, the AI-assisted targeting identified gaps in geochemistry and age constraints on the prospective host stratigraphy. During the second quarter of this year, surface sampling was undertaken utilizing several material types to refine the surface expression of structures defined in the comprehensive model. Sampling of historical drilling was also submitted for additional geochemical testing, clay mineralogy evaluations and biostratagraphic age determination. These data are in the process of being reported back and will be evaluated during Q4 to define plans for exploration in 2027.
The Company spent $1.3 million in the nine months ended September 30, 2026 related to Snowstorm.
FELCH PROPERTY
In November 2025, the company completed an option agreement with Keweenaw Land Association (KLA), a large mineral rights holder, to explore mineral tenures in the Upper Peninsula of Michigan. During the early part of 2026 a comprehensive data compilation was undertaken that brought together available geology,
Page 13


geophysical surveys, historical drilling data, geochemistry, LiDAR and land tenure. These multiple data sets were compiled into a GIS database to develop an exploration strategy to define fertile structures that could host orogenic gold occurrences.
Beginning in the third quarter of this year, a detailed Quaternary geology map was produced and a till sampling program was undertaken. In conjunction with the till sampling, relogging and systematic sampling was completed on core from the 2021 drill campaign completed by KLA. The drill hole resampling guided an intensive till sampling effort down ice of a gold occurrence and was augmented with regional till sampling. Till samples were sent for both geochemical analysis and gold grain count measurements. In conjunction with this work, targeted detailed geological mapping was completed.
Completed assays results and gold grain count measurements have not been reported from the laboratories. Recently, a long awaited airborne magnetic map was published by the USGS, these results are being evaluated by a consultant for incorporation into the GIS database.
The Company spent $0.7 million in the nine months ended September 30, 2026 linked to the Felch Property Option Program.
MINERAL INTERESTS
During the nine months ended September 30, 2026, the Company capitalized an aggregate of $113.0 million (2025 - $84.0 million) expenditures attributed to mineral interests. The breakdown of the mineral interest expenditures by project is illustrated in the following table:
(in thousands of Canadian dollars)Nine months ended September 30, 2026Nine months ended September 30, 2025
AmountPercentageAmountPercentage
KSM103,918 92 %60,331 72 %
Bronson Corridor6,115 5 %16,444 20 %
Snowstorm1,298 1 %1,244 1 %
3 Aces991 1 %5,487 6 %
Felch692 1 %- - %
Courageous Lake- - %486 1 %
Total expenditures113,014 100 %83,992 100 %
Page 14


FINANCIAL RESULTS
Quarterly results
(in thousands of Canadian dollars)Three months ended September 30,Nine months ended September 30,
2026202520262025
Gain on distribution of mineral properties- - 151,691 - 
Remeasurement gain (loss) on secured note liabilities through profit and loss16,177 (20,033)31,877 (23,871)
Corporate and administrative expenses(5,833)(4,671)(21,915)(13,981)
Foreign exchange gain (loss)(765)(12,607)(17,778)17,574 
Remeasurement gain on loss of significant influence- - 7,333 - 
Other income - flow-through shares- 8,177 - 14,400 
Finance income532 1,518 2,617 3,750 
Finance costs and other income269 (143)(1,951)(432)
Income (loss) before income taxes10,380 (27,759)151,874 (2,559)
Income tax expense(3,677)(4,511)(34,312)(6,831)
Net income (loss)6,703 (32,270)117,562 (9,390)
During the current quarter, the Company recorded net income of $6.7 million, or $0.06 per share on a basic and diluted basis. During the comparative period of 2025, the Company recorded net loss of $32.3 million, or $0.32 per share, on both a basic and diluted basis. During the nine months ended September 30, 2026, the Company invested $188.7 million to progress the KSM Project while a joint venture agreement is being pursued, compared to $52.8 million during the same period last year. At September 30, 2026, cash and cash equivalents were $56.3 million.
During the nine months ended September 30, 2026, the Company recorded net income of $117.6 million, or $1.09 per share on a basic and diluted basis. During the comparative period of 2025, the Company recorded net loss of $9.4 million, or $0.09 per share, on both a basic and diluted basis.
The increase in net income for the three months ended September 30, 2026 was primarily attributable to the $16.2 million gain recognized on the remeasurement of secured note liabilities, compared with a $20.0 million loss recognized in the corresponding quarter of the prior year.
Gain on distribution of mineral properties
The increase in net income for nine months ended September 30, 2026 was primarily attributable to the $151.7 million gain recognized on the disposition of the Courageous Lake Project to Valor pursuant to the completed plan of arrangement. The gain was calculated as the difference between the fair value of the distribution of $211.8 million and the carrying value of the Courageous Lake mineral interests of $83.7 million, after recognizing the gold stream interest at a fair value of $13.6 million and reversing the related deferred tax liability of $20.0 million.
Remeasurement gain (loss) on secured note liabilities through profit and loss
Due to the expectation that the Silver Financing Put embedded in the 2022 Secured Note and NSR Financing Put embedded within the 2023 Secured Note will become exercisable on March 24, 2028, the Company is required to compare the present value of the contractual cash flows payable upon exercise of the put with the fair value of the Secured Notes, determined using a discounted cash flow model incorporating a Monte Carlo simulation. As at September 30, 2026, the present value of the contractual cash flows associated with the Silver Financing Put and NSR Financing Put exceeded the fair value of the 2022
Page 15


and 2023 Secured Notes. Accordingly, the liability was measured based on the higher amount, being the value of the embedded put options.
During the three months ended September 30, 2026, the gain recognized on the remeasurement of secured note liabilities was mainly due to the financial put option, change in valuation date, change in credit spread, and the payment of interest, partially offset by delay in commercial production date. While the embedded put option became the primary driver of the liability valuation as at September 30, 2026, its value decreased compared to June 30, 2026, primarily as a result of lower projected silver prices and higher discount rates applied to the estimated cash flows.
During the nine months ended September 30, 2026, the gain recognized on the remeasurement of secured note liabilities was mainly due to the financial put option, change in credit spread, increase in discount rates and the payment of interest, partially offset by the impact of valuing the notes at reporting periods closer to maturity and delay in commercial production. While the embedded put option remained the primary driver of the liability valuation, its value decreased from December 31, 2025 primarily as a result of lower projected silver prices and higher discount rates applied to the estimated cash flows.
During the three and nine months ended September 30, 2025, the loss recognized on the remeasurement of secured note liabilities was mainly the net result of losses due to an increase in metal prices and the impact of valuing the notes at reporting periods closer to maturity, partially offset by the gain due to a slight increase in discount rates and payment of interest.
Corporate and administrative expenses
Corporate and administrative expenses are outlined below:
(in thousands of Canadian dollars)Three months ended September 30,Nine months ended September 30,
2026202520262025
Employee compensation1,458 1,412 5,361 4,827 
Stock-based compensation1,686 1,049 5,869 3,520 
Professional fees1,163 924 2,520 1,985 
Other general and administrative1,263 1,286 3,528 3,648 
Expenses related to assets held for distribution263 - 4,637 - 
Corporate and administrative expenses5,833 4,671 21,915 13,980 
Total Corporate and administrative expenses for the three months ended September 30, 2026, were $5.8 million compared to $4.7 million in the prior-year period. The increase was mainly due to $0.3 million of costs related to the disposition of Courageous Lake assets to Valor, and higher stock-based compensation.
Total Corporate and administrative expenses for the nine months ended September 30, 2026, were $21.9 million compared to $14.0 million in the prior-year period. The increase was mainly due to $4.6 million of costs related to the disposition of Courageous Lake assets to Valor, higher stock-based compensation, increased professional fees and higher employee compensation.
During the nine months ended September 30, 2026, stock-based compensation expense related to restricted share units (“RSUs”) and deferred share units (“DSUs”) increased by $2.3 million, when compared to the same periods in 2025. The increase was primarily due to higher numbers of outstanding RSUs and DSUs in 2026 compared to 2025 (943,485 vs 807,802), and higher fair value at the December 2025 grant date compared to fair value at the December 2024 and 2023 grant dates.
As at September 30, 2026, 856,934 RSUs and 86,551 DSUs were outstanding.
During the first quarter of 2026, 6,000 RSUs were granted to a new member of the executive team. During Q2 of 2026, the number of outstanding RSUs and DSUs was adjusted by 36,319 RSUs and 3,651 DSUs,
Page 16


respectively, in connection with the distribution of Valor Shares to Seabridge shareholders under the Courageous Lake spin-out transaction.
Foreign exchange
(in thousands of Canadian dollars)Three months ended September 30,Nine months ended September 30,
2026202520262025
Unrealized foreign exchange (loss) gain(925)(13,143)(19,366)17,941 
Realized foreign exchange gain (loss)160 536 1,588 (367)
Foreign exchange (loss) gain(765)(12,607)(17,778)17,574 
Movements in foreign exchange are primarily due to the revaluation of monetary assets and liabilities as at the balance sheet date and the appreciation or depreciation of the Canadian dollar compared to the US dollar in the period.
The secured note liabilities are denominated in US dollars. The impact of foreign exchange rate fluctuations on the valuation of the secured note liabilities is recorded as foreign exchange gain (loss) through profit and loss. Remaining foreign exchange gains or losses are primarily related to the revaluation of cash and cash equivalents denominated in US dollars. Depreciation of the Canadian dollar relative to the US dollar during the current quarter resulted in a $0.9 million unrealized foreign exchange loss on the revaluation of secured note liabilities and, conversely, a $0.2 million realized foreign exchange gain on the revaluation of cash and cash equivalents denominated in US dollars. Depreciation of the Canadian dollar relative to the US dollar during the nine months ended 2026 resulted in a $19.4 million unrealized foreign exchange loss on the revaluation of secured note liabilities and, conversely, a $1.6 million realized foreign exchange gain on the revaluation of cash and cash equivalents denominated in US dollars.
Conversely, during the prior year quarter, the appreciation of the Canadian dollar relative to the US dollar resulted in the opposite impact, with foreign exchange gains recognized on the revaluation of the US dollar-denominated secured note liabilities and foreign exchange losses recognized on the revaluation of US dollar-denominated cash and cash equivalents.
During the nine months ended September 30, 2025 the depreciation of the Canadian dollar relative to the US dollar resulted in the foreign exchange loss recognized on the revaluation of the US dollar-denominated secured note liabilities partially offset by the foreign exchange gain recognized on the revaluation of US dollar-denominated cash and cash equivalents.
Other income - flow-through shares
During the three and nine months ended September 30, 2026, the Company did not recognize any income related to the flow-through share premiums, as all premiums from prior years' financings had been fully recognized by December 31, 2025. During the three and nine months ended September 30, 2025, the Company recognized $8.2 million and $14.4 million, respectively, of other income related to the flow-through share premium recorded on the financings completed in June 2024, October 2024, December 2024 and June 2025.
Interest income
Interest income recognized during the three and nine months ended September 30, 2026, amounted to $0.5 million and $2.6 million, respectively, compared to $1.5 million and $3.8 million during the three and nine months ended September 30, 2025. The decrease was primarily attributable to interest income earned on cash deposits and short-term investments, which were higher in 2025 compared to 2026.
Page 17


Finance costs and other
Finance costs and other amounted to income of $0.3 million and expense of $2.0 million, respectively, for the three and nine months ended September 30, 2026 compared to expenses of $0.1 million and $0.4 million respectively, for the three and nine months ended September 30, 2025. The finance income for the current quarter of $0.3 million relates to the gain on the revaluation of the gold stream asset, compared to the loss of $1.9 million for the nine month period.
As of September 30, 2026 capitalized interest related to the secured note liabilities amounted to $25.5 million, compared to $25.6 million in the comparative period of 2025.
Income tax recovery (expense)
During the nine months ended September 30, 2026, the Company recognized income tax expense of $34.3 million, primarily reflecting deferred tax liabilities associated with the $151.7 million gain recognized on the disposition of the Courageous Lake assets to Valor and fair value gains related to the valuation of the secured note liabilities. This was partially offset by foreign exchange losses related to the valuation of the secured note liabilities. The income tax impact of $13.3 million, recorded through other comprehensive income (loss), primarily relates to the portion of the revaluation of the secured note liabilities that was recorded through other comprehensive income (loss) during the current period.
During the nine months ended September 30, 2025, the Company recognized income tax expense of $6.8 million, primarily reflecting deferred tax liability arising from the renouncement of flow-through expenditures, partially offset by income tax recovery arising from the losses incurred in the period. The income tax impact of $1.7 million, recorded through other comprehensive income (loss), was mainly related to the portion of the revaluation of the secured note liabilities that was recorded through other comprehensive income (loss) during the current period.
QUARTERLY INFORMATION
Selected financial information for the last eight quarters ending September 30, 2026 is as follows:
(in thousands of Canadian dollars,
except per share amounts)
202620252024
Q3Q2Q1Q4Q3Q2Q1Q4
Revenue- - - - - - - - 
Net income (loss) for the period6,703 117,506 (6,647)(43,782)(32,270)12,329 10,551 (40,764)
Basic income (loss) per share0.06 1.09 (0.06)(0.42)(0.32)0.12 0.11 (0.45)
Diluted income (loss) per share0.06 1.08 (0.06)(0.42)(0.32)0.12 0.11 (0.45)
Seabridge does not derive any revenue from its operations. Its primary focus is the exploration and development of its resource properties.
The significantly higher income in the second quarter of 2026 was primarily due to a $151.7 million gain recognized on the disposition of the Courageous Lake mineral properties to Valor in connection with the spin-out transaction. Other fluctuations in income (loss) in current and prior quarters are mainly the result of non-cash valuation gains or losses recognized on the fair value revaluation of its secured note liabilities each quarter, driven primarily by changes in prices of metals, forecasted future production volumes, discount rates, and foreign exchange gains or losses on the same secured note liabilities that are denominated in U.S. dollars.
The income (loss) per period has also fluctuated depending on the Company’s activity level, reflected in corporate and administrative expenses.
Page 18


FINANCIAL POSITION SUMMARY
(in thousands of Canadian dollars)September 30,
2026
December 31,
2025
Cash and cash equivalents56,289 117,528 
Other current assets25,050 96,620 
Non-current assets1,765,663 1,553,701 
Total assets1,847,002 1,767,849 
Current liabilities140,112 40,883 
Non-current liabilities excluding secured note liabilities38,275 3,478 
Secured note liabilities536,883 598,517 
Total liabilities715,270 642,878 
Total equity1,131,732 1,124,971 
Total liabilities and equity1,847,002 1,767,849 
Cash and cash equivalents
Cash and cash equivalents decreased primarily due to cash used in investing and operating activities, partially offset by $69.9 million in borrowings and $35.8 million raised from ATM share issuance.
Other current assets
Other current assets primarily consist of HST receivables, other receivables, prepaid expenses, and investments. The decrease in other current assets compared to December 31, 2025 was mainly due to the transfer of $83.4 million of assets related to the Courageous Lake Gold Project to Valor Gold Corp. as part of the completion of the spin-out transaction during the current quarter. Prior to the transfer, these assets were classified as assets held for distribution.
Non-current assets
Non‑current assets consist primarily of mineral interests, property and equipment, other long‑term assets and receivables, reclamation deposits, and gold stream interest. The increase from the prior period was driven mainly by continued investment in mineral interests and property and equipment, as well as recognition of $12.0 million gold stream interest related to the Courageous Lake Project. This increase was partially offset by the reduction of a deferred income tax asset of $12.4 million recognized at December 31, 2025. The deferred income tax asset recognized in December 2025 primarily related to the non-cash loss recognized on the fair value remeasurement of secured note liabilities, partially reduced by foreign exchange gains arising from the valuation of the secured notes, resulting in a significant reduction of the deferred income tax asset balance.
Current liabilities
The current liabilities balance primarily consists of trade and other payables, borrowings and the current portion of the provision for reclamation liabilities. The increase in current liabilities at September 30, 2026 is mainly due to higher payable and accrued liabilities associated with seasonal activities at KSM and exploration projects and $69.9 million in short term borrowings under the loan facility. Included in payable and accrued liabilities is $37.2 million related to the KSM Project, primarily reflecting seasonal increases in construction, development, engineering, and feasibility study planning activities. Subject to the terms of the loan agreement, the Company may elect to settle all or a portion of the principal and accrued interest in cash, common shares, or a combination thereof.
Page 19


Non-current liabilities
Non-current liabilities include secured note liabilities of $536.9 million as at September 30, 2026, compared to $598.5 million as at December 31, 2025. The $61.6 million decrease is primarily due to an increase in credit spread, impact of the financing put option and an increase in discount rates, which reduce the fair value of the secured note liabilities, as well as settlement of interest. In addition, due to the expectation that the Silver Financing Put embedded in the 2022 Secured Note and the NSR Financing Put embedded in the 2023 Secured Note will become exercisable on March 24, 2028, the Company is required to compare the present value of the contractual cash flows payable upon exercise of the put options with the fair value of the secured notes. As at September 30, 2026, the present value of these contractual cash flows exceeded the fair value of the underlying secured notes; accordingly, the liabilities were measured based on the higher value of the embedded put options. Despite this requirement, the value of the embedded put options decreased compared to December 31, 2025, primarily as a result of changes in silver price assumptions and higher discount rates. These decreases were partially offset by the depreciation of the Canadian dollar relative to the U.S. dollar and the impact of valuing the notes at reporting dates closer to maturity.
Non-current liabilities, excluding secured note liabilities, consist primarily of provision for reclamation liabilities, lease obligations and deferred income tax liabilities. During the nine months ended September 30, 2026, the Company recognized a deferred income tax liability of $34.9 million, primarily reflecting the non-cash tax impact of the gain recognized on the disposition of the Courageous Lake assets to Valor and non-cash gains arising from the fair value remeasurement of secured note liabilities. This was partially offset by foreign exchange losses related to the secured notes and losses arising from the valuation of marketable securities.
LIQUIDITY AND CAPITAL RESOURCES
(in thousands of Canadian dollars)September 30,
2026
December 31,
2025
Current assets
Cash and cash equivalents56,289 117,528 
Amounts receivable and prepaid expenses10,241 4,482 
Investment in marketable securities14,809 8,750 
Total current assets81,339 130,760 
Current liabilities
Accounts payable and accrued liabilities67,613 17,565 
Loan payable69,940 - 
Lease obligations534 366 
Provision for reclamation liabilities2,025 3,044 
Total current liabilities140,112 20,975 
Working (Deficit) Capital (1)
(58,773)109,785 
Add back loan payable69,940 - 
Adjusted Working Capital (1)
11,167 109,785 
1.This is a non-GAAP financial performance measure with no standard definition under IFRS.
The Company’s working capital position decreased by $168.6 million, from $109.8 million on December 31, 2025 to a working capital deficit of $58.8 million at September 30, 2026. The decrease was mainly due to cash utilized to fund site operating and investing and higher accounts payable and accrued liabilities resulting from seasonal increases in site activities, partially offset by $35.8 million raised in Q1 2026 through the ATM offering.
As at September 30, 2026, the Company had cash and cash equivalents of $56.3 million (December 31, 2025 - $117.5 million) and current financial liabilities of $138.1 million (December 31, 2025 - $17.9 million).
Page 20


Except for the secured note liabilities, the loan facility, lease obligations and the reclamation obligations, the Company’s financial liabilities primarily have contractual maturities of 30 days and are subject to normal trade terms. The Company’s ability to fund its operations and capital expenditures and other obligations as they become due is dependent upon market conditions. The Company’s approach to managing liquidity risk is to maintain sufficient cash resources and access to financing to meet obligations as they become due, which includes reducing or deferring non-discretionary expenditures if required, including early works and other activities necessary to advance the KSM project, and other discretionary activities at the Company’s exploration projects
In the third quarter of 2026, the Company entered into a US$100 million loan facility in the third quarter of 2026, of which US$50 million ($69.9 million) was drawn at September 30, 2026 and the remaining US$50 million was drawn on November 2, 2026 subsequent to quarter-end, fully utilizing the facility. Amounts drawn under the loan facility are due on or before December 31, 2026. Subject to the terms of the loan agreement, the Company may elect to settle all or a portion of the principal and accrued interest in cash, common shares, or a combination thereof. Any issuance of common shares is subject to TSX approval and applicable TSX pricing requirements. The issue price of any shares cannot be lower than the minimum price permitted under TSX requirements and, in all cases, is determined based on the greater of 92.5% of the 20-day volume weighted average trading price and the minimum price permitted by the TSX. The number of shares issuable is further limited such that the lender and its affiliates cannot own more than 4.9% of the Company's outstanding common shares following the issuance. To the extent these requirements are not satisfied, settlement must be made in cash. The ultimate form of settlement will depend on the Company's share price, capital structure, and the shareholdings of the lender at the date of settlement. Assuming settlement of the loan facility at September 30, 2026 in common shares, the adjusted working capital is $11.2 million.
The following table details the Company’s expected remaining contractual cash flow requirements for its financial liabilities on repayment or maturity periods. The amounts presented are based on the contractual undiscounted cash flows and may not agree with the carrying amounts in the condensed consolidated interim statements of financial position.
(in thousands of Canadian dollars)
Less than 1 year
1-3 years
3-5 years
Greater than 5 years
Total
2022 Secured Note including interest
20,814 
41,629 
41,629 
219,476 
323,548 
2023 Secured Note including interest
13,876 
27,752 
27,752 
143,956 
213,336 
Lease obligation
227 
1,043 
435 
396 
2,101 
Loan payable
71,348 
- 
- 
- 
71,348 
106,265 
70,424 
69,816 
363,828 
610,333 
If the Company is unable to settle all or a portion of the amounts payable for the loan facility or the Secured Notes in shares, the Company would be required to seek external sources of financing to fund any payments due, such as obtaining replacement royalty arrangements or raising additional capital, which would be subject to market conditions that are outside the Company’s control. The significant judgments relate to the availability and timing of external funding on acceptable terms, the effect of the Company’s share price, the effect of foreign exchange rates, applicable approval and ownership limitations on its ability to settle the loan facility or Secured Notes in common shares, and management’s ability to reduce or defer discretionary expenditures as necessary.
During the nine months ended September 30, 2026, the Company raised net $35.8 million (for the year ended 2025 - $100.8 million) through an ATM offering. During the first quarter of 2025, the Company replaced its base shelf prospectus and related registration statement with a new US$750 million base shelf prospectus and registration statement that expires in February 2027. The Company's ATM equity program established under the shelf has since been fully utilized.
To satisfy the interest payment on the 2022 Secured Note, during the nine months ended September 30, 2026, the Company issued 419,138 common shares in respect of the interest incurred during the period (nine months ended September 30, 2025 - 771,648 common shares). To satisfy the interest payment on the 2023 Secured Note for the nine months ended September 30, 2026, the Company issued 279,426 common
Page 21


shares in settlement of interest incurred during the period. Interest incurred during the nine months ended September 30, 2025 was accrued as the deferred interest and paid in December 31, 2025.
With respect to the secured notes, and following an amendment to the put-rights under the secured note in Q2 2026, as at September 30, 2026, the Company has assessed that the Silver and NSR Financing Put (“Financing Puts”) are expected to become exercisable on March 24, 2028, and are not exercisable prior to that date. If exercised, the Company would be required to pay US$247.1 million, plus accrued and unpaid interest related to the 2022 Secured Note, and US$164.8 million, plus accrued and unpaid interest related to the 2023 Secured Note. The Company has the option to settle amounts due on exercise of the Financing Puts through the issuance of common shares, subject to ownership limitations, or in cash. The ultimate form of settlement will depend on the Company’s share price, capital structure, and the noteholder’s shareholdings at the date of settlement. As the Financing Puts are not exercisable until March 2028, the Company expects the Financing Puts will become exercisable at that time, and no determination regarding the settlement method has been made as at September 30, 2026.
As the Company does not generate cash inflows from operations, the Company is dependent upon external sources of financing, including the US$100 million loan facility, which was fully drawn as of November 2, 2026, to fund its exploration projects and ongoing activities. When and if required, the Company will seek additional sources of financing to fund its exploration and development programs at its key projects. Funding for KSM remains an important consideration as the Company advances its joint venture negotiations for the Project with its preferred partner.
COMMITMENTS AND CONTINGENCIES
The following table summarizes the maturities of the Company’s financial liabilities and commitments as at September 30, 2026 based on the undiscounted contractual cash flows:
Payments due by years
(in thousands of Canadian dollars)Total20262027-20282029-20302031-2032
2022 Secured Note – interest 114,009 5,204 41,629 41,629 25,547 
2023 Secured Note – interest 76,005 3,469 27,752 27,752 17,032 
Capital expenditure commitments25,230 25,230 - - - 
Loan payable71,348 71,348 - - - 
Mineral interests8,356 200 2,106 2,373 3,677 
Lease obligation2,101 227 1,043 435 396 
297,049 105,678 72,530 72,189 46,652 
Prior to its maturity, the 2022 Secured Note bears interest at 6.5%, or US$14.6 million per annum, payable quarterly in arrears. Prior to its maturity, the 2023 Secured Note bears interest at 6.5% or US$9.8 million per annum, payable quarterly in arrears. The Company can elect to satisfy interest payments in cash or by delivering common shares or a combination of the two, subject to limitations described below.
Page 22


SECURED NOTES LIABILITIES
On March 24, 2022, KSMCo entered into an agreement selling a secured note that is to be exchanged at maturity for a 60% gross silver royalty (the “Silver Royalty”) on the KSM Project for US$225 million. On May 8, 2026, KSMCo entered into an amending agreement that amended the terms of the Silver Financing Put to delay the date this put becomes exercisable by one year in exchange for an increase in the amount payable on exercise of the Silver Financing Put.
Refer to Note 12 of the Company's December 31, 2025 consolidated financial statements for the terms of the 2022 Secured Note.
During the second quarter of 2026, the 2022 Secured Note agreement was amended, extending the Silver Financing Put exercise date to March 24, 2028 and increasing the put exercise amount by 6.5% to US$247.1 million.
To satisfy the interest payment on the 2022 Secured Note, the Company issued 419,138 common shares, during the nine months ended September 30, 2026, in respect of the interest incurred during the nine months ended September 30, 2026 (nine months ended September 30, 2025 - 771,648 common shares).
Based on the evaluation of the likelihood of various scenarios regarding the timeline for securing project financing, the Company continues to assume that the Silver Financing Put would become exercisable on March 24, 2028.
Due to the expectation that the Silver Financing Put embedded within the 2022 Secured Note will be exercisable on March 24, 2028, the Company is required to record the present value of the contractual cash flows that will be payable, if such value exceeds the fair value of the 2022 Secured Note calculated using the discounted cash flow with a Monte Carlo simulation. As of September 30, 2026, the discounted value of the contractual cash flows related to the Silver Financing Put embedded within the 2022 Secured Note exceeded the fair value of the 2022 Secured Note leading, the Company to record the higher amount. In contrast, as at December 31, 2025, the fair value of the 2022 Secured Note was higher than the discounted value of the Silver Financing Put's contractual cash flows.
During the three and nine months ended September 30, 2026, the fair value of the 2022 Secured Note decreased, and the Company recognized a gain of $18.1 million and $10.8 million, respectively (three and nine months ended September 30, 2025 - loss of $5.5 million and gain of $3.7 million, respectively).
Key valuation assumptions in respect of the 2022 Notes are summarized in the following table:
Key inputs and assumptionsSeptember 30,
2026
December 31,
2025
Forecast silver production in thousands of ounces166,144166,144
Silver spot price per ounce 1
$60.73$71.99
Royalty rate75 %75 %
Risk-free rate5.6 %4.8 %
Credit spread6.0 %4.6 %
Share price volatility60 %60 %
Silver royalty discount factor16.9 %14.5 %
1.The metal prices used in the model are based on the quoted forward prices, where available, and adjusted for forward risk-free rates and cost of carry beyond quoted future forward prices.




Page 23


The movements in the carrying value of the 2022 Secured Note during the three and nine months ended September 30, 2026 were as follows:
(in thousands of Canadian dollars)Three months ended September 30,Nine months ended September 30,
2026202520262025
Carrying value beginning of the period341,608 304,508 334,330 313,766 
Change in fair value (gain) loss through profit and loss(22,373)2,265 (2,719)5,629 
Change in fair value (gain) loss through other comprehensive income (loss)3,760 (3,715)(19,808)962 
Foreign currency translation (gain) loss553 6,966 11,745 (10,332)
Total change in carrying value(18,060)5,516 (10,782)(3,741)
Carrying value end of the period323,548 310,025 323,548 310,025 
On June 29, 2023, KSMCo, entered into an agreement selling a secured note. On May 8, 2026, KSMCo entered into an amending agreement that amended the terms of the NSR Financing Put to delay the date this put becomes exercisable by one year in exchange for an increase in the amount payable on exercise of the NSR Financing Put. The 2023 secured note issued in 2023, as amended (“2023 Secured Note” and together with the 2022 Secured Note the “Secured Notes”), has a principal amount of US$150 million.
Refer to Note 12 of the Company's December 31, 2025 consolidated financial statements for the terms of the 2023 Secured Note.
During the second quarter of 2026, the 2023 Secured Note agreement was amended, extending the NSR Financing Put exercise date to March 24, 2028 and increasing the put exercise amount by 6.5% to US$164.8 million.
To satisfy the interest payment on the 2023 Secured Note, during the nine months ended September 30, 2026, the Company issued 279,426 common shares in respect of the interest incurred during the period. Interest incurred during the nine months ended September 30, 2025 was accrued as Deferred Interest. The Interest Deferral Amount was settled on December 29, 2025 through the issuance of 774,841 Seabridge common shares.
Based on the evaluation of the likelihood of various scenarios regarding the timeline for securing project financing, the Company continues to assume that the NSR Financing Put would become exercisable on March 24, 2028.
Due to the expectation that the NSR Financing Put embedded within the 2023 Secured Note will be exercisable on March 24, 2028, the Company is required to record the present value of the contractual cash flows that will be payable, if such value exceeds the fair value of the 2023 Secured Note calculated using the discounted cash flow with a Monte Carlo simulation. As of September 30, 2026, the discounted value of the contractual cash flows related to the NSR Financing Put embedded within the 2023 Secured Note exceeded the fair value of the 2023 Secured Note leading the Company to record the higher amount. In contrast, as at December 31, 2025, the fair value of the 2023 Secured Note was higher than the discounted value of the NSR Financing Put's contractual cash flows.
During the three and nine months ended September 30, 2026, the carrying value of the 2023 Secured Note decreased by $6.1 million and $50.9 million, respectively (three and nine months ended September 30, 2025 - increased by $1.8 million and $24.3 million, respectively).




Page 24


The following key inputs and assumptions were used in the determination of fair value:
Key inputs and assumptionsSeptember 30,
2026
December 31,
2025
Forecast NSR:
Gold in thousands of ounces10,50010,500
Silver in thousands of ounces29,87629,876
Copper in millions of pounds19,32219,322
Molybdenum in millions of pounds152152
Metals spot prices on September 30, 2026, and December 31, 2025 1
Gold per ounce$4,188.75$4,307.95
Silver per ounce$60.73$71.99
Copper per pound$6.54$5.63
Molybdenum per pound$33.57$21.50
NSR Rate1.25 %1.25 %
Risk-free rate5.6 %4.8 %
Credit spread5.0 %4.6 %
Share price volatility60 %60 %
NSR royalty discount factor16.9 %14.5 %
1.The metal prices used in the model are based on the quoted forward prices, where available, and adjusted for forward risk-free rates and cost of carry beyond quoted future forward prices
The movements in the carrying value of the 2023 Secured Note during the three and nine months ended September 30, 2026 were as follows:
(in thousands of Canadian dollars)Three months ended September 30,Nine months ended September 30,
2026202520262025
Carrying value beginning of the period219,466271,346264,187 248,786 
Change in carrying value (gain) loss through profit and loss6,19617,768(29,158)25,114 
Change in carrying value (gain) loss through other comprehensive income (loss)(12,773)(22,178)(29,633)6,820 
Foreign currency translation (gain) loss447 6,175 7,939 (7,609)
Total change in carrying value(6,130)1,765 (50,852)24,325 
Carrying value end of the period213,335 273,111 213,335 273,111 









Page 25


During the nine months ended September 30, 2026, the fair value of the secured note liabilities decreased by $61.6 million, from $598.5 million on December 31, 2025 to $536.9 million on September 30, 2026. The decrease in the fair value was primarily due to an increase in credit spread and discount rates, as well as settlement of interest, partially offset by higher metal prices, depreciation of the Canadian dollar compared to the US dollar, and the impact of valuing the notes at reporting periods closer to maturity.
The fair value of the Secured Notes is estimated using Level 3 inputs and is most sensitive to changes in discount rates, metal prices, and forecasted production.
The change in the fair value of the secured note liabilities during the three and nine months ended September 30, 2026 and the prior period is summarized in the following table:
(in thousands of Canadian dollars)Three months ended September 30,Nine months ended September 30,
2026202520262025
Secured Note:
Remeasurement difference16,177 (20,033)31,877 (30,743)
Foreign exchange gain (loss)(1,000)(13,141)(19,684)17,941 
Gain (loss) through other comprehensive income (loss)9,013 25,893 49,441 (7,782)
Decrease (increase) in fair value during the period24,190 (7,281)61,634 (20,584)
CONTINGENCIES
During 2016, upon the completion of an audit by tax authorities of the Company's application under the British Columbia Mineral Exploration Tax Credit (“BCMETC”) program, in respect of expenditures incurred in 2010 and 2011, the Company was reassessed $3.6 million, including accrued interest for expenditures that the tax authority categorized as not qualifying for the BCMETC program. In 2017 the Company filed an objection to the reassessment with the appeals division of the tax authorities and paid one-half of the reassessed amount to the Receiver General. In 2019, the Company received a decision from the appeals division that the Company’s objection was denied, and the Company filed a Notice of Appeal with the British Columbia Supreme Court. The Attorney General of Canada replied to the facts and arguments in the Company’s Notice of Appeal and stated its position that the Company’s expenditures did not qualify for the BCMETC program. The Company presented its case in the BC Supreme Court in September 2024. As at September 30, 2026, the Company had paid $1.6 million to the Receiver General, and the Canada Revenue Agency (“CRA”) had withheld $2.3 million of HST credits due to the Company that would fully cover the residual balance claimed by CRA, including interest. As a result, at March 31, 2025 the Company had recorded a long-term receivable of $3.9 million, including $0.3 million of additional interest charged after the reassessment. On March 26, 2025, a judgment (the “BC METC Judgment”) was rendered substantially in the favor of the Company and confirmed that the Company’s expenditures did qualify for the BCMETC program. During the last quarter of 2025, the Company was returned the full $3.9 million plus $0.5 million in additional interest, or $4.4 million in total.
As previously disclosed in the Company’s prior years' financial statements and in its consolidated financial statements for the year ended December 31, 2025, in 2019 the Company received a notice from the CRA that it proposed to reduce the amount of expenditures reported as Canadian Exploration Expenses (“CEE”) for the three years ended December 31, 2016. The Company has funded certain of its exploration expenditures, from time to time, with the proceeds from the issuance of flow-through shares and renounced, to flow-through share subscribers, the expenditures which it determined to be CEE. The notice disputed the eligibility of the same types of expenditures the CRA categorized as not qualifying for the BCMETC program in the case described above and the relevant wording of the test for expenditures that qualify for the BCMETC program is the same as the relevant wording of the test for expenditures that qualify as CEE. The Company responded to the CRA auditors with additional information for their consideration. In 2020, the CRA auditors responded to the Company’s submission and, although accepting additional expenditures as CEE, reiterated that their position remains largely unchanged and subsequently issued reassessments to the Company reflecting the additional CEE expenditures accepted and $2.3 million of Part Xll.6 tax owing. The CRA has reassessed certain investors who subscribed for the flow-through shares, reducing CEE deductions. Notice of objections to the Company’s and investors’ reassessments have been filed for all those
Page 26


that have been received and will be appealed to the courts, should the notice of objections be denied. The Company has indemnified the investors that subscribed for the flow-through shares and that have been reassessed by depositing the amount of their reassessments, including interest charges, into the accounts of the reassessed investors with the Receiver General in return for such investors' agreement to object to their respective reassessments and to repay the Company any refund of the amount deposited on their behalf upon resolution of the Company’s appeal. During 2021, 2022 and 2023, the Company deposited $9.4 million into the accounts of certain investors with the Receiver General. The deposits made have been recorded as long-term receivables on the statement of financial position as at September 30, 2026. The potential tax indemnification to the investors is estimated to be $10.8 million, plus $4.3 million in potential interest. If the reasoning of the BCMETC Judgement is applied to the expenditures claimed not to be eligible as CEE by the CRA, the notices of objection should be accepted and the reassessments of the Company and the investors should be reversed. No provision has been recorded related to the tax, potential interest, or the potential indemnity, as the Company and its advisors do not consider it probable that there will ultimately be an amount payable.
CONTROLS AND PROCEDURES
The Company’s management, under the supervision of the Chief Executive Officer and Chief Financial Officer, are responsible for designing adequate internal controls over financial reporting or causing them to be designed under their supervision in order to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with IFRS. Management is responsible for establishing and maintaining adequate internal controls over financial reporting. The control framework used is the Internal Control - Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO).
Disclosure Controls and Procedures and Internal Controls over Financial Reporting
Pursuant to regulations adopted by the U.S. Securities and Exchange Commission, under the U.S. Sarbanes-Oxley Act of 2002 and those of the Canadian Securities Administrators, management evaluates the effectiveness of the design and operation of the Company’s disclosure controls and procedures, and internal control over financial reporting. This evaluation is done under the supervision of, and with the participation of, the Chief Executive Officer and the Chief Financial Officer.
Disclosure controls and procedures have been designed to ensure that information required to be disclosed by the Company is recorded, processed, summarized and reported within the time periods specified in the rules and forms. Disclosure controls and procedures include, without limitation, controls and procedures designed to ensure that information required to be disclosed by the Company is accumulated and communicated to management as appropriate, to allow timely decisions regarding required disclosure. The Company’s Chief Executive Officer and Chief Financial Officer have concluded, based on their evaluation of the design of the disclosure controls and procedures as of September 30, 2026, that they are appropriately designed.
Limitations of Controls and Procedures
The Company’s management, including the Chief Executive Officer and Chief Financial Officer, believes that any internal controls over financial reporting and disclosure controls and procedures, no matter how well designed, can have inherent limitations. Therefore, even those systems determined to be effective can provide only reasonable assurance that the objectives of the control system are met.
Changes to Internal Controls Over Financial Reporting
There has been no change in the Company’s design of internal controls over financial reporting that has materially affected, or is reasonably likely to materially affect, the Company’s internal controls over financial reporting during the period covered by this MD&A.
Page 27


CYBERSECURITY
The Company’s management is responsible for cybersecurity, and the Board of Directors has granted the Audit Committee the authority to oversee management’s assessment of cybersecurity risks and their prevention and mitigation approaches and to investigate any material breaches. To date, there have been no material breaches of security measures of which the Company is aware.
SUSTAINABILITY
Management and the Board of Directors consider more than just environmental, social, and governance issues when considering sustainability. The Company also takes into account diversity, equity and inclusion (DEI) to form our overall approach to sustainability. Thus, the Board of Directors and management have incorporated sustainability into the Company’s goals, priorities, and strategies to operate safely, sustainably and with leading governance standards. The Board of Directors has established a sustainability Committee and granted that Committee oversight responsibilities with respect to the Company’s sustainability initiatives. This Committee reviews climate-related and nature-related risks and opportunities each time they meet and shares key discussion points with the Board of Directors. The Company’s sustainability strategy encompasses its Sustainability Policy, a strategic framework, and the Company’s sustainability reporting practice. The Sustainability Policy influences the decisions and behaviors of the Company’s employees, contractors, and the Board of Directors in associated matters. The Policy also governs the strategic framework and sustainability goals. The Company publishes its Sustainability Report annually, covering its sustainability performance and approach to climate change issues for the preceding year. As the Company operates in the natural resource extraction industry, the Company strives to achieve leading operating standards, assessing and mitigating the impacts on the physical environment and the communities in which the Company operates.
In the nine months ended September 30, 2026, and to the date of this report, the Company had no significant environmental and safety incidents that required reporting to government agencies or other regulators.
In addition to its Sustainability Policy, the Company has implemented an Environmental Policy, Health and Safety Policy, Respectful Workplace Policy & Program to address discrimination, bullying, harassment, sexual harassment, and workplace violence and Workplace Employment Policy to support diversity and equal opportunity. The Sustainability Reports, including climate strategy, and the Company’s policies related to ESG can be found on the Company’s website www.seabridgegold.com.
SHARES ISSUED AND OUTSTANDING
As of November 12, 2026, the issued and outstanding common shares of the Company totaled 108,079,853. In addition, there were 856,934 RSUs and 86,551 DSUs outstanding. Assuming the conversion of all of these instruments into shares, the issued and outstanding common shares would be 108,529,726.
RELATED PARTY TRANSACTIONS
During the nine months ended September 30, 2026, there were no payments to related parties other than compensation paid to key management personnel. These transactions were in the normal course of operations and were measured at the exchange amount, which is the amount of consideration established and agreed to by the related parties.
RECENT ACCOUNTING PRONOUNCEMENTS
Refer to Note 3 in the Company’s unaudited condensed consolidated interim financial statements for the period ended September 30, 2026.
Page 28


CRITICAL ACCOUNTING ESTIMATES
Refer to Note 4 in the Company’s audited consolidated financial statements for the year ended December 31, 2025.
RISKS AND UNCERTAINTIES
The risks and uncertainties are discussed within the Company’s most recent Annual Information Form filed on SEDAR+ at www.sedarplus.com, and the Annual Report on Form 40-F filed on EDGAR at www.sec.gov/edgar.shtml.
CAUTIONARY STATEMENT ON FORWARD-LOOKING STATEMENTS
The consolidated financial statements and management’s discussion and analysis and any other materials included with them contain certain forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of Canadian securities laws concerning future events or future performance relating but not limited to the Company’s expectations, intentions, estimates, plans and beliefs. Forward-looking information can often be identified by forward-looking words such as “anticipate”, “believe”, “expect”, “goal”, "objective", "strategy", "plan", “intend”, “estimate”, "project", “may” and “will” or similar words suggesting future outcomes, or other expectations, beliefs, estimates, plans, objectives, assessments, assumptions, intentions or statements about future events or performance. Forward-looking information may include reserve and resource estimates and expected changes to them, estimates of future production and related financial analysis, unit costs, costs of exploration programs or capital projects, timing of commencement or completion of operations, the realization of the Company’s plans, the completion of corporate transactions, the achievement of various corporate objectives and their timing, the outcomes of court proceedings, the values of the Secured Notes and the assumptions underlying such values, and the performance of systems and procedures and is based on current expectations that involve several business risks and uncertainties. Forward-looking statements are necessarily based on estimates and assumptions made by the Company in light of its experience and perception of historical trends, current conditions and expected future developments, some of which may be inaccurate.
Forward-looking statements are subject to risks, uncertainties, and other factors that could cause actual results to differ materially from expected results. Factors that could cause actual results to differ materially from any forward-looking statement include, but are not limited to, the failure to raise the funds necessary to conduct its activities, to secure a joint venture partner to advance and build the KSM project, to meet debt service obligations, or to determine estimated resources and reserves, the grade and recovery of ore which is mined varying from estimates, capital and operating costs varying significantly from estimates, the inability to maintain good relationships with Indigenous groups with rights over the areas of its projects, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, a cybersecurity incident, adverse court rulings, climate and nature related risks to performance of work and maintenance of infrastructure, failure of personnel or contractors to perform within expected timelines and costs, inflation, changes in exchange rates, fluctuations in commodity prices, challenges to property title or access to properties, increased competition for properties, personnel or supplies, delays in the development of projects, unavailability of insurance and other factors identified in the Company’s other disclosure documents from time-to-time.
Shareholders are cautioned not to place undue reliance on forward-looking statements. By its nature, forward looking information involves numerous assumptions, inherent risks and uncertainties, both general and specific, that contribute to the possibility that the predictions, forecasts, projections and various future events will not occur. The Company undertakes no obligation to update publicly or otherwise revise any forward-looking information, whether as a result of new information, future events, or other such factors which affect this information, except as required by law.
Page 29

Filing Exhibits & Attachments

2 documents

Keep reading