Bolivar recovery and mixed Q1 2026 output for Santacruz Silver (SCZM)

Filing Impact
(Neutral)
Filing Sentiment
(Neutral)
Form Type
6-K

Rhea-AI Filing Summary

Santacruz Silver Mining reported Q1 2026 production of 1,341,499 ounces of silver, 21,640 tonnes of zinc, 2,686 tonnes of lead, and 308 tonnes of copper from its Bolivian mines and the Zimapan mine in Mexico. Silver output was broadly flat versus Q4 2025 but 16% lower than Q1 2025, while zinc rose 4% year over year and copper increased 10%.

Bolivar’s recovery continued, with silver production up 28% quarter over quarter to 259,635 ounces despite fewer operating days, though still below Q1 2025 levels. Caballo Blanco delivered steady silver and stronger lead output, Porco remained zinc-focused, and San Lucas grew silver, zinc, and lead production versus Q1 2025. Zimapan saw lower silver, zinc, and lead volumes due to ventilation delays and power interruptions, partly offset by higher copper.

The company also updated its disclosure approach, emphasizing actual metal production and treating silver-equivalent and zinc-equivalent figures—2,281,465 AgEq ounces and 59,370 ZnEq tonnes in Q1 2026—as supplemental metrics calculated using quarterly average LME prices.

Positive

  • None.

Negative

  • None.
Silver production 1,341,499 ounces Total consolidated production, Q1 2026
Zinc production 21,640 tonnes Total consolidated production, Q1 2026
Silver equivalent production 2,281,465 ounces AgEq production, Q1 2026 supplemental metric
Zinc equivalent production 59,370 tonnes ZnEq production, Q1 2026 supplemental metric
Bolivar silver output 259,635 ounces Q1 2026, up 28% vs Q4 2025
Porco zinc output 2,833 tonnes Q1 2026, up 4% vs Q4 2025
Caballo Blanco silver output 306,888 ounces Q1 2026, up 6% vs Q4 2025
Zimapan silver output 362,863 ounces Q1 2026, down 10% vs Q4 2025
silver-equivalent financial
"silver-equivalent (“AgEq”) production for Q1 2026 totaled 2,281,465 ounces"
A silver-equivalent figure converts production or resources of various metals into a single silver ounce number by using current price ratios, so different metals can be summed as if they were all silver. For investors, it simplifies comparison of a mining operation’s total output or value the way converting multiple currencies into dollars makes a portfolio easier to view, but it can hide differences in extraction cost, market risk and long-term price outlook for each metal.
zinc-equivalent financial
"zinc-equivalent (“ZnEq”) production reached 59,370 tonnes"
London Metal Exchange financial
"metal prices used in the calculation of AgEq and ZnEq are based on the average quarterly prices quoted on the London Metal Exchange"
The London Metal Exchange is the primary global marketplace where industrial metals such as copper, aluminum, zinc, lead and nickel are bought and sold through standardized contracts for immediate or future delivery. Its prices act as international benchmarks that influence costs, profits and risk for miners, manufacturers and investors — like a widely watched price tag that helps market participants hedge exposure, set budgets and make investment decisions.
International Financial Reporting Standards financial
"should not be considered in isolation or as a substitute for performance measures prepared in accordance with International Financial Reporting Standards"
International Financial Reporting Standards are a common set of accounting rules used by companies in many countries to prepare and present their financial statements. They matter to investors because they make results easier to compare across borders — like using the same measuring tape — so investors can assess profitability, cash flow and risk more reliably and spot differences that come from business performance rather than differing accounting methods.
NI 43-101 regulatory
"an independent consultant to the Company, is a qualified person under NI 43-101"
A Canadian regulatory standard that sets the rules for how mining and exploration companies must report mineral resources and reserves, requiring technical reports prepared or signed off by an independent, certified expert. It matters to investors because it creates a consistent, transparent “inspection report” for mining projects, making it easier to compare prospects, judge the reliability of claims, and assess geological and financial risk before investing.
ore sourcing and trading business financial
"San Lucas is the Company’s ore sourcing and trading business in Bolivia"

 

 

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

FORM 6-K

 

Report of Foreign Private Issuer

Pursuant to Rule 13a-16 or 15d-16

UNDER the Securities Exchange Act of 1934

 

For the month of April 2026

 

Commission File No.: 001-43051

 

Santacruz Silver Mining Ltd.

(Translation of registrant’s name into English)

 

480 – 1140 West Pender Street

Vancouver, British Columbia

Canada V6E 4G1

(Address of principal executive office)

 

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F: Form 20-F ☐ Form 40-F ☒

 

 

 

 

 

 

EXHIBIT INDEX

 

Exhibit   Description
99.1   Press Release dated April 16, 2026

 

 

 

 

SIGNATURE

 

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

  Santacruz Silver Mining Ltd.
   
Date: April 17, 2026 By: /s/ Andres Bedregal
  Name: Andres Bedregal
  Title: Chief Financial Officer

 

 

 

 

Exhibit 99.1

 

News Release
 April 16, 2026

 

Santacruz Reports Q1 2026 Production of 1,341,499 Ounces of Silver and 21,640 Tonnes of Zinc, with Continued Recovery of Production at Bolivar Mine

 

Including 2,686 Tonnes of Lead and 308 Tonnes of Copper

Silver Production at Bolivar Increased by 28% QoQ

 

Vancouver, B.C. – Santacruz Silver Mining Ltd. (NASDAQ:SCZM) (TSX.V:SCZ) (“Santacruz” or the “Company”) announces that total production in the first quarter of 2026 (“Q1 2026”) was 1,341,499 ounces of silver, 21,640 tonnes of zinc, 2,686 tonnes of lead, and 308 tonnes of copper. This production was generated across the Company’s operations in Bolivia, including the Bolivar mine, the Porco mine, the Caballo Blanco Group of mines (“Caballo Blanco”), and the San Lucas Ore Sourcing Business, which includes the Reserva Mine (“San Lucas”), as well as the Zimapan mine in Mexico.

 

Q1 2026 Production Highlights

 

Primary Production Metrics:

 

Silver: 1,341,499 ounces
Zinc: 21,640 tonnes
Lead: 2,686 tonnes
Copper: 308 tonnes

 

Supplemental Production Metrics:

 

Silver Equivalent Production: 2,281,465 silver equivalent ounces
Zinc Equivalent Production: 59,370 zinc equivalent tonnes

 

Arturo Préstamo, Executive Chairman and CEO of Santacruz, commented: “Q1 2026 was marked by strong operational progress at our Bolivar mine, where silver production increased 28% quarter-over-quarter to 259,635 ounces, driven by ongoing recovery efforts made in the areas affected by the localized flooding event that occurred in May 2025. Looking at our other assets in Bolivia, Caballo Blanco remained a steady contributor, while San Lucas continued to enhance plant utilization and operational flexibility. In Mexico, Zimapan consistently contributed to our consolidated production performance. It’s important to mention that as the Carnival holiday period in Bolivia occurs in Q1, the number of operating days is reduced as compared with other quarters. With fewer operating days, a reduction in production is expected. It’s important to note that Bolivar’s production increased in Q1 despite fewer operating days.”

 

Mr. Préstamo added: “In response to the recent increased volatility in silver prices, and to better reflect the strength, resilience, and breadth of our silver-zinc co-product business model, we are enhancing our production disclosure beginning with Q1 2026. Our enhanced production disclosures will place greater emphasis on actual metal production, with silver equivalent and zinc equivalent metrics presented as supplemental production metrics only. We believe this new approach provides investors with a clearer, transparent, and more balanced view of operating performance across our diversified production portfolio. In addition, the new production disclosures will more appropriately reflect San Lucas’s contribution, which differs from traditional mining operations, while remaining strategically important to our portfolio in Bolivia.”

 

1

 

 

Consolidated Production Summary

 

Production Summary - Total

 

               Change   Change 
Primary production metrics  2026 Q1   2025 Q4   2025 Q1   2026-Q1 vs 2025-Q4   2026-Q1 vs 2025-Q1 
Silver (ounces)   1,341,499    1,343,607    1,590,063    0%   -16%
Zinc (tonnes)   21,640    23,846    20,719    -9%   4%
Lead (tonnes)   2,686    3,000    2,718    -10%   -1%
Copper (tonnes)   308    287    279    7%   10%

 

               Change   Change 
Supplemental context metrics  2026 Q1   2025 Q4   2025 Q1   2026-Q1 vs 2025-Q4   2026-Q1 vs 2025-Q1 
Silver Equivalent Produced (ounces) (1)   2,281,465    2,886,207    3,682,011    -21%   -38%
Zinc Equivalent Produced (tonnes) (2)   59,370    49,993    41,407    19%   43%

 

(1) (2) Calculation methods may differ from those used by other companies. Refer to the “Methodology for Silver Equivalent and Zinc Equivalent Production Figures” section below.

 

Consolidated silver production remained broadly stable at 1,341,499 ounces in Q1 2026, compared to 1,343,607 ounces in Q4 2025. This resilient performance was underpinned by continued operational momentum at the Bolivar mine, where silver production increased again on a quarter-over-quarter basis. Consolidated zinc production was 21,640 tonnes, down 9% from 23,846 tonnes in the prior quarter, while lead production decreased 10% to 2,686 tonnes and copper production increased 7% to 308 tonnes. Compared with Q1 2025, consolidated silver production decreased 16%, while consolidated zinc production increased 4%. Lead production was broadly unchanged year over year, and copper production increased 10%.

 

For additional context, and as a supplement to our primary metal production disclosure, silver-equivalent (“AgEq”) production for Q1 2026 totaled 2,281,465 ounces, while zinc-equivalent (“ZnEq”) production reached 59,370 tonnes. As both metrics are influenced by relative metal prices, the Company believes the quarter is best assessed based on actual metal production, particularly silver and zinc, with AgEq and ZnEq presented solely as supplemental reference metrics reflecting the Company’s multi-metal production profile. Readers are cautioned that silver-equivalent calculations can become less representative in periods when silver price significantly outperforms the prices of other metals.

 

2

 

 

Bolivar Mine

 

               Change   Change 
   2026 Q1   2025 Q4   2025 Q1   2026-Q1 vs 2025-Q4   2026-Q1 vs 2025-Q1 
Material Processed (tonnes milled)   65,044    63,267    62,356    3%   4%
Metal production (1)                         
Silver (ounces)   259,635    202,193    421,040    28%   -38%
Zinc (tonnes)   3,656    3,973    3,983    -8%   -8%
Lead (tonnes)   198    187    201    6%   -1%
                          
Average Grade                         
Silver (g/t)   141    108    237    30%   -41%
Zinc (%)   6.06    6.75    7.00    -10%   -13%
Lead (%)   0.43    0.40    0.47    8%   -9%
                          
Metal Recovery                         
Silver (%)   88    92    89    -4%   0%
Zinc (%)   93    93    91    0%   2%
Lead (%)   70    74    68    -6%   2%

 

(1) Bolivar is presented at 100% whereas the Company records 45% of revenues and expenses in its consolidated financial statements.

 

Q1 2026 vs Q4 2025

 

Compared with Q4 2025, Bolivar’s silver production increased 28% to 259,635 ounces from 202,193 ounces, supported by a meaningful increase in silver head grades as recovery activities continued to advance in the areas affected by the 2025 flooding event. Zinc production decreased 8% to 3,656 tonnes from 3,973 tonnes, reflecting lower zinc grades, while recoveries remained broadly stable. Lead production increased modestly to 198 tonnes from 187 tonnes. Notably, this gradual improvement was achieved in a quarter with fewer effective working days than Q4 2025, which reflects the typical seasonality of Bolivia´s operating calendar when comparing the first quarter to the preceding fourth quarter, and further reinforces the view that Bolivar’s recovery continued to progress well.

 

Q1 2026 vs Q1 2025

 

Compared with Q1 2025, Bolivar’s silver production decreased 38% from 421,040 ounces to 259,635 ounces, while zinc production decreased 8% from 3,983 tonnes to 3,656 tonnes. Lead production was broadly unchanged at 198 tonnes compared with 201 tonnes in Q1 2025. While production remained below the prior year’s quarter, Q1 2026 demonstrated continued progress along the recovery trajectory, particularly when compared to the more recent quarters following Bolivar’s May 2025 flooding event.

 

3

 

 

Porco Mine

 

               Change   Change 
   2026 Q1   2025 Q4   2025 Q1   2026-Q1 vs 2025-Q4   2026-Q1 vs 2025-Q1 
Material Processed (tonnes milled)   45,297    51,416    47,501    -12%   -5%
Metal production (1)                         
Silver (ounces)   70,708    82,047    120,537    -14%   -41%
Zinc (tonnes)   2,833    2,727    2,674    4%   6%
Lead (tonnes)   114    108    161    6%   -29%
                          
Average Grade                         
Silver (g/t)   59    61    98    -3%   -39%
Zinc (%)   6.61    5.66    5.99    17%   10%
Lead (%)   0.34    0.28    0.46    21%   -26%
                          
Metal Recovery                         
Silver (%)   82    81    81    1%   1%
Zinc (%)   95    94    94    1%   1%
Lead (%)   74    74    73    -1%   1%

 

(1) Porco is presented at 100% whereas the Company records 45% of revenues and expenses in its consolidated financial statements.

 

Q1 2026 vs Q4 2025

 

Compared with Q4 2025, Porco’s silver production decreased 14% to 70,708 ounces from 82,047 ounces, while zinc production increased 4% to 2,833 tonnes from 2,727 tonnes. Lead production increased 6% to 114 tonnes from 108 tonnes. Q1 2026 remained consistent with Porco’s role as a predominantly zinc-oriented underground operation, with stronger zinc grades and recoveries supporting zinc output.

 

Q1 2026 vs Q1 2025

 

Compared with Q1 2025, Porco’s silver production decreased 41% from 120,537 ounces to 70,708 ounces, while zinc production increased 6% from 2,674 tonnes to 2,833 tonnes. Lead production decreased to 114 tonnes from 161 tonnes. This result remained consistent with mine sequencing focused on zinc-rich areas and Porco’s role as a predominantly zinc-oriented operation.

 

Caballo Blanco Group

 

               Change   Change 
   2026 Q1   2025 Q4   2025 Q1   2026-Q1 vs 2025-Q4   2026-Q1 vs 2025-Q1 
Material Processed (tonnes milled)   58,999    63,067    51,648    -6%   14%
Metal production (1)                         
Silver (ounces)   306,888    289,446    313,266    6%   -2%
Zinc (tonnes)   3,967    4,409    3,549    -10%   12%
Lead (tonnes)   767    769    486    0%   58%
                          
Average Grade                         
Silver (g/t)   175    156    202    12%   -14%
Zinc (%)   7.15    7.39    7.28    -3%   -2%
Lead (%)   1.54    1.51    1.15    2%   34%
                          
Metal Recovery                         
Silver (%)   93    91    93    1%   -1%
Zinc (%)   94    95    94    -1%   0%
Lead (%)   84    81    82    5%   3%

 

(1) The Caballo Blanco Group consists of the Colquechaquita and Tres Amigos mines.

 

4

 

 

Q1 2026 vs Q4 2025

 

Compared with Q4 2025, Caballo Blanco’s silver production increased by 6% to 306,888 ounces from 289,446 ounces. Zinc production decreased by 10% to 3,967 tonnes from 4,409 tonnes, while lead production was broadly stable at 767 tonnes compared with 769 tonnes in the prior quarter. Higher silver grades, together with modestly improved silver recoveries, supported solid silver performance in Q1 2026, while the operation continued to perform consistently as one of the Company’s more stable contributors.

 

Q1 2026 vs Q1 2025

 

Compared with Q1 2025, Caballo Blanco’s silver production was broadly stable at 306,888 ounces versus 313,266 ounces, while zinc production increased 12% from 3,549 tonnes to 3,967 tonnes. Lead production increased 58% from 486 tonnes to 767 tonnes. Caballo Blanco continued to demonstrate solid production performance and strong operating consistency.

 

Zimapan Mine

 

               Change   Change 
   2026 Q1   2025 Q4   2025 Q1   2026-Q1 vs 2025-Q4   2026-Q1 vs 2025-Q1 
Material Processed (tonnes milled)   223,670    222,703    223,573    0%   0%
Metal production                         
Silver (ounces)   362,863    403,321    440,199    -10%   -18%
Zinc (tonnes)   4,040    5,008    4,498    -19%   -10%
Lead (tonnes)   1,005    1,237    1,389    -19%   -28%
Copper (tonnes)   308    287    279    7%   10%
                          
Average Grade                         
Silver (g/t)   78    80    80    -2%   -2%
Zinc (%)   2.55    2.89    2.56    -12%   0%
Lead (%)   0.62    0.72    0.72    -14%   -14%
Copper (%)   0.25    0.26    0.26    -4%   -4%
                          
Metal Recovery                         
Silver (%)   65    70    77    -8%   -16%
Zinc (%)   71    78    79    -9%   -10%
Lead (%)   73    78    86    -6%   -15%
Copper (%)   54    50    48    8%   14%

 

Q1 2026 vs Q4 2025

 

Compared with Q4 2025, Zimapan’s silver production decreased 10% to 362,863 ounces from 403,321 ounces, while zinc production decreased 19% to 4,040 tonnes from 5,008 tonnes. Lead production decreased 19% to 1,005 tonnes from 1,237 tonnes, while copper production increased 7% to 308 tonnes from 287 tonnes. The quarter reflected lower grades and recoveries in silver, zinc, and lead, while copper performance improved.

 

The lower production was primarily driven by reduced ventilated mining areas, including limited ventilation in higher-grade zones at Level 960, following a contractor delay in the completion of a ventilation Robbins incline shaft. In addition, there were intermittent operating days at the milling facility due to power supply interruptions by the Comisión Federal de Electricidad (CFE), the national power company.

 

5

 

 

Q1 2026 vs Q1 2025

 

Compared with Q1 2025, Zimapan’s silver production decreased 18% from 440,199 ounces to 362,863 ounces, while zinc production decreased 10% from 4,498 tonnes to 4,040 tonnes. Lead production decreased 28% from 1,389 tonnes to 1,005 tonnes, while copper production increased 10% from 279 tonnes to 308 tonnes. The year-over-year result was mixed, but Zimapan remained an important contributor to consolidated output and continues to be managed with a focus on recoveries and concentrate quality.

 

San Lucas Ore Sourcing Business

 

               Change   Change 
   2026 Q1   2025 Q4   2025 Q1   2026-Q1 vs 2025-Q4   2026-Q1 vs 2025-Q1 
Material Processed (tonnes milled)   94,767    105,587    86,695    -10%   9%
                          
Metal production                         
Silver (ounces)   341,405    366,600    295,021    -7%   16%
Zinc (tonnes)   7,144    7,729    6,015    -8%   19%
Lead (tonnes)   602    699    481    -14%   25%
                          
Average Grade                         
Silver (g/t)   139    135    123    3%   13%
Zinc (%)   8.47    8.20    7.65    3%   11%
Lead (%)   1.00    0.97    0.84    3%   19%
                          
Metal Recovery                         
Silver (%)   81    80    86    1%   -6%
Zinc (%)   89    89    91    0%   -2%
Lead (%)   63    68    66    -7%   -4%

 

San Lucas is the Company’s ore sourcing and trading business in Bolivia and should be regarded as a strategic component of the broader Bolivian production portfolio. By procuring mineralized material from third-party suppliers and processing it through the Company’s existing plants, San Lucas supports higher plant utilization, enhances fixed-cost absorption, and increases overall operating flexibility. Given its margin-based structure, purchase prices are aligned to contained metal value. San Lucas is best evaluated on the basis of margin generation and its contribution to overall operating efficiency, rather than on average feed grade alone.

 

Q1 2026 vs Q4 2025

 

Compared with Q4 2025, San Lucas produced 341,405 ounces of silver, 7,144 tonnes of zinc, and 602 tonnes of lead, compared with 366,600 ounces of silver, 7,729 tonnes of zinc, and 699 tonnes of lead. While metal production was lower quarter over quarter, San Lucas continued to fulfill its strategic role in supporting plant utilization and operating flexibility across the Bolivian platform.

 

Q1 2026 vs Q1 2025

 

Compared with Q1 2025, San Lucas increased silver production by 16% from 295,021 ounces to 341,405 ounces, zinc production by 19% from 6,015 tonnes to 7,144 tonnes, and lead production by 25% from 481 tonnes to 602 tonnes. The year-over-year improvement highlights the value of San Lucas as a flexible feed sourcing platform that supports mill utilization, fixed-cost absorption, and commercial flexibility across the Company’s Bolivian operations.

 

6

 

 

Methodology for the Calculation of Silver Equivalent and Zinc Equivalent Production Figures

 

Commencing Q1 2026, the Company has improved its production disclosure by reporting Zinc Equivalent tonnes produced and has changed the method of calculating Silver Equivalent Ounces produced. The Company considers silver equivalent (“AgEq”) ounces and zinc equivalent (“ZnEq”) tonnes to be useful supplemental production metrics for evaluating its multi-metal production profile. These measures are commonly used in the mining industry as reference metrics to facilitate period-over-period comparisons and, where relevant, benchmarking against industry peers. They should be viewed as supplemental to, and not a substitute for, the actual metal production volumes disclosed on a metal-by-metal basis.

 

AgEq ounces and ZnEq tonnes are calculated by applying conversion factors that normalize the value of each non-reference metal to the selected reference metal. For AgEq ounces, the values of zinc, lead, and copper are converted into silver equivalent ounces. For ZnEq tonnes, the values of silver, lead, and copper are converted into zinc equivalent tonnes. Each conversion factor is derived from the ratio of the in-situ metal value of the contained fine metal to the price of the reference metal used in the equivalency calculation. The denominator used to calculate silver equivalent ounces is the silver price, while the denominator used to calculate zinc equivalent tonnes is the zinc price. This methodology expresses multi-metal production in a common unit of measure. Since the silver price and zinc price are the denominators in each metric, price variations of these metals can significantly affect the result, especially when one metal price changes significantly relative to the other metal prices.

 

The metal prices used in the calculation of AgEq and ZnEq are based on the average quarterly prices quoted on the London Metal Exchange (“LME”). Previously, the Company used budgeted metal prices which were only updated annually. The Company considers that it is more appropriate to use the quarter’s actual prices to determine the period’s AgEq and ZnEq production volumes to better reflect production results in the context of volatile market prices. Previously reported AgEq ounces produced have been updated using the period’s corresponding quarterly average LME prices instead of the budgeted prices which were previously used.

 

Prices:  Zinc   Lead   Silver   Copper 
Average Q1-LME/2026   3,243    1,931    84.39    12,852 
Average Q4-LME/2025   3,165    1,971    54.83    11,100 
Average Q1-LME/2025   2,838    1,970    31.91    9,346 

 

The methods used by the Company to calculate these equivalencies may differ from those used by other companies reporting similar metrics and therefore may not be directly comparable. These measures are intended to provide additional information and should not be considered in isolation or as a substitute for performance measures prepared in accordance with International Financial Reporting Standards (“IFRS”).

 

Qualified Person

 

Garth Kirkham, P.Geo., an independent consultant to the Company, is a qualified person under NI 43-101 and has approved the scientific and technical information contained within this news release.

 

7

 

 

About Santacruz Silver Mining Ltd.

 

Santacruz Silver is engaged in the operation, acquisition, exploration, and development of mineral properties across Latin America. In Bolivia, the Company operates the Bolivar, Porco, and Caballo Blanco mining complexes, with Caballo Blanco comprising the Tres Amigos and Colquechaquita mines. The Reserva mine, whose production is provided to the San Lucas ore sourcing and trading business, is also located in Bolivia. Additionally, the Company oversees the Soracaya exploration project. In Mexico, Santacruz operates the Zimapan mine.

 

‘signed’

Arturo Préstamo Elizondo,

Executive Chairman and CEO

 

For further information please contact:

 

Arturo Préstamo

Santacruz Silver Mining Ltd.

Email: info@santacruzsilver.com

Telephone: +52 81 83 785707

 

Andrés Bedregal

Santacruz Silver Mining Ltd.

Email: info@santacruzsilver.com

Telephone: +591 22444849

 

Eduardo Torrecillas

Santacruz Silver Mining Ltd.

Email: info@santacruzsilver.com

Telephone: +591 22444849

 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) nor the Nasdaq Capital Market LLC accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

 

Forward Looking Information

 

This news release includes certain statements and information that may constitute forward-looking information within the meaning of applicable Canadian securities laws. Forward-looking statements relate to future events or future performance and reflect the expectations or beliefs of management of the Company regarding future events. Generally, forward-looking statements and information can be identified by the use of forward-looking terminology such as “intends”, “expects” or “anticipates”, or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “should”, “would” or will “potentially” or “likely” occur.

 

These forward-looking statements involve numerous risks and uncertainties and actual results might differ materially from results suggested in any forward-looking statements. These risks and uncertainties include, among other things, risks related to changes in general economic, business and political conditions, including changes in the financial markets, changes in applicable laws, and compliance with extensive government regulation, as well as those risk factors discussed or referred to in the Company’s disclosure documents filed with the securities regulatory authorities in certain provinces of Canada and available at www.sedarplus.ca.

 

In making the forward-looking statements in this news release, the Company has applied several material assumptions, including without limitation, the assumption that the Company’s capital investments will result in reduced costs and enhanced metallurgical recovery.

 

There can be no assurance that any forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, the reader should not place any undue reliance on forward-looking information or statements. The Company undertakes no obligation to update forward-looking information or statements, other than as required by applicable law.

 

8

FAQ

What were Santacruz Silver Mining (SCZM) total production figures in Q1 2026?

Santacruz produced 1,341,499 ounces of silver, 21,640 tonnes of zinc, 2,686 tonnes of lead, and 308 tonnes of copper in Q1 2026. These volumes came from operations in Bolivia and the Zimapan mine in Mexico, reflecting a diversified multi-metal production base.

How did Santacruz Silver’s Q1 2026 production compare with Q4 2025?

Silver production was broadly stable at 1,341,499 ounces versus 1,343,607 ounces in Q4 2025. Zinc fell 9% to 21,640 tonnes, lead declined 10% to 2,686 tonnes, while copper increased 7% to 308 tonnes, showing a mixed but resilient operational performance overall.

What progress did the Bolivar mine show for Santacruz Silver (SCZM) in Q1 2026?

Bolivar’s silver production rose 28% quarter over quarter to 259,635 ounces, driven by higher silver grades as recovery continued after a May 2025 flooding event. This improvement occurred despite fewer operating days in Bolivia during the Carnival holiday period, supporting Bolivar’s recovery narrative.

How did the Zimapan mine affect Santacruz Silver’s Q1 2026 results?

At Zimapan, Q1 2026 silver output fell 10% to 362,863 ounces, with zinc and lead each down 19% versus Q4 2025. Lower grades and recoveries, ventilation constraints from a delayed incline shaft, and intermittent power supply interruptions contributed, although copper production improved to 308 tonnes.

What changes did Santacruz Silver make to its production disclosure in Q1 2026?

Santacruz shifted emphasis to actual metal production, presenting silver-equivalent and zinc-equivalent metrics only as supplemental. AgEq and ZnEq are now calculated using quarterly average LME prices, which the company believes better reflect results amid volatile markets and clarify contributions across its diversified portfolio.

What is the role of the San Lucas ore sourcing business for Santacruz Silver (SCZM)?

San Lucas procures mineralized material from third parties and processes it through Santacruz’s plants in Bolivia. It is margin-based, aligning purchase prices with contained metal value, and is evaluated on margin and operating efficiency, helping boost plant utilization, fixed-cost absorption, and flexibility across the Bolivian operations.

Filing Exhibits & Attachments

2 documents