STOCK TITAN

[6-K] Turbo Energy, S.A. Current Report (Foreign Issuer)

Filing Impact
(Low)
Filing Sentiment
(Neutral)
Form Type
6-K

Turbo Energy reported a material commercial contract in a Form 6-K: a press release dated September 16, 2025, announcing a $53 million agreement to deploy 366 MWh of solar storage capacity across 10 factories. The filing itself attaches the press release as exhibits and is signed by CEO Mariano Soria. The arrangement specifies total capacity (366 MWh), number of sites (10 factories) and contract value ($53 million), indicating a multi-site industrial energy storage deployment for the company.

This disclosure is a clear revenue-generating commercial win documented through the company's current report, providing investors factual detail on contract size, scope and that the announcement was made public via a press release included with the 6-K.

Turbo Energy ha riportato un elemento contrattuale commerciale di rilievo in un Form 6-K: un comunicato stampa datato 16 settembre 2025 che annuncia un accordo da 53 milioni di dollari per implementare 366 MWh di capacità di accumulo solare in 10 impianti. Il documento allega il comunicato stampa come allegato e porta la firma del CEO Mariano Soria. L'accordo specifica la capacità totale (366 MWh), il numero di sedi (10 impianti) e il valore contrattuale (53 milioni di dollari), indicando una distribuzione di accumulo energetico industriale su più siti per l'azienda.

Questa comunicazione rappresenta una chiara vittoria commerciale generatrice di entrate, documentata tramite la relazione periodica dell'azienda, fornendo agli investitori dettagli concreti su dimensione del contratto, ambito e sul fatto che l'annuncio sia stato reso pubblico tramite un comunicato incluso nella 6-K.

Turbo Energy informó de un contrato comercial significativo en un Form 6-K: un comunicado de prensa con fecha de 16 de septiembre de 2025 que anuncia un acuerdo de 53 millones de dólares para desplegar 366 MWh de capacidad de almacenamiento solar en 10 fábricas. El propio documento adjunta el comunicado de prensa como anexos y está firmado por el CEO Mariano Soria. El acuerdo especifica la capacidad total (366 MWh), el número de sitios (10 fábricas) y el valor del contrato (53 millones de dólares), indicando un despliegue de almacenamiento de energía industrial en múltiples sitios para la empresa.

Esta divulgación es una victoria comercial claramente orientada a generar ingresos documentada a través del informe actual de la empresa, proporcionando a los inversores detalles fácticos sobre el tamaño del contrato, el alcance y que el anuncio fue hecho público mediante un comunicado incluido con el 6-K.

Turbo Energy는 Form 6-K에서 중대한 상업 계약을 보고했습니다: 2025년 9월 16일자 보도 자료로, 10개의 공장에서 366 MWh의 태양광 저장 용량을 배치하는 5300만 달러 규모의 계약을 발표합니다. 제출서는 보도자료를 부속서로 첨부하고 CEO 마리오노 소리아가 서명했습니다. 이 계약은 총 용량 366 MWh, 사이트 수 10개, 계약 금액 5300만 달러를 명시하며, 다중 현장에 걸친 산업용 에너지 저장 배치를 나타냅니다.

이 공시는 회사의 현행 보고를 통해 수익 창출 가능한 상업적 승리를 명확히 기록하고 있으며, 계약 규모와 범위에 대한 사실적 세부 정보와 6-K에 포함된 보도 자료를 통해 발표가 공개되었음을 투자자들에게 제공합니다.

Turbo Energy a annoncé dans le Form 6-K un important contrat commercial : un communiqué de presse daté du 16 septembre 2025, annonçant un accord de 53 millions de dollars pour déployer 366 MWh de capacité de stockage solaire sur 10 sites industriels. Le dossier lui-même joint le communiqué en pièce et est signé par le PDG Mariano Soria. L’accord précise la capacité totale (366 MWh), le nombre de sites (10 usines) et la valeur du contrat (53 millions de dollars), indiquant un déploiement de stockage d’énergie industriel multi-sites pour l’entreprise.

Cette divulgation constitue une victoire commerciale clairement génératrice de revenus, documentée via le rapport courant de l’entreprise, fournissant aux investisseurs des détails factuels sur la taille du contrat, son périmètre et le fait que l’annonce a été rendue publique par le biais d’un communiqué inclus dans le 6-K.

Turbo Energy meldete einen bedeutenden kommerziellen Vertrag in einem Form 6-K: eine Pressemitteilung vom 16. September 2025, in der eine Vereinbarung über 53 Millionen US-Dollar zur Bereitstellung von 366 MWh Solarenergiespeicherkapazität in 10 Fabriken angekündigt wird. Die Einreichung bindet die Pressemitteilung als Anhang ein und ist vom CEO Mariano Soria unterschrieben. Die Vereinbarung spezifiziert die Gesamtkapazität (366 MWh), die Anzahl der Standorte (10 Fabriken) und den Vertragswert (53 Millionen US-Dollar) und deutet auf eine standortübergreifende industrielle Energiespeicher-Implementierung für das Unternehmen hin.

Diese Offenlegung ist ein klarer, um Umsätze generierender kommerzieller Gewinn, dokumentiert durch den aktuellen Bericht des Unternehmens, der Investoren konkrete Details zur Vertragsgröße, zum Umfang und dazu liefert, dass die Ankündigung über eine im 6-K enthaltene Pressemitteilung öffentlich gemacht wurde.

أبلغت Turbo Energy عن عقد تجاري هام في نموذج 6-K: بيان صحفي بتاريخ 16 سبتمبر 2025 يعلن عن اتفاق بقيمة 53 مليون دولار لنشر سعة تخزين شمسية تبلغ 366 ميغاواط ساعة عبر 10 مصانع. يرفق الملف نفسه البيان الصحفي كملاحق ويُوقعه الرئيس التنفيذي ماريوانو سوريا. يحدد الاتفاق السعة الإجمالية (366 ميغاواط ساعة)، وعدد المواقع (10 مصانع) وقيمة العقد (53 مليون دولار)، مما يشير إلى توزيع تخزيني صناعي للطاقة عبر عدة مواقع للشركة.

هذا الإفصاح يمثل فوزاً تجارياً مولِّداً للإيرادات موثقاً من خلال تقرير الشركة الحالي، مقدمًا للمستثمرين تفاصيل واقعية حول حجم العقد ونطاقه وأن الإعلان تم علنيته عبر بيان صحفي مُدرج مع 6-K.

Turbo Energy在表格6-K中披露了一份重要的商业合同:一份日期为2025年9月16日的新闻稿,宣布一项5300万美元的协议,在10家工厂部署366 MWh的太阳能储能容量。 该 filing 本身将新闻稿作为附件附上,并由首席执行官Mariano Soria签署。该协议明确总容量为366 MWh、站点数量为10个工厂、合同金额为5300万美元,表明公司将进行多现场的工业能储存部署。

此披露是通过公司的当前报告记录下来的明确的创收型商业胜利,为投资者提供了合同规模、范围的实际细节,以及该公告通过包含在6-K中的新闻稿公开发布的信息。

Positive
  • $53 million contract disclosed publicly via 6-K
  • 366 MWh total capacity indicating substantial project scale
  • Deployment across 10 factories suggests multi-site commercial traction
  • CEO-signed filing confirms company authorization of the disclosure
Negative
  • None.

Insights

TL;DR: A $53M, 366 MWh, 10-site contract is a material commercial award that should boost near-term project backlog and demonstrate industrial demand.

The contract size and multi-site scope are significant for a developer/operator of battery storage; 366 MWh represents substantial deployed capacity and $53 million is a meaningful commercial order that will convert into revenue as deployments occur. Key considerations for investors include contract timing, payment milestones, margin profile and whether Turbo Energy retains long-term O&M obligations or has third-party EPC partners. The filing only attaches the press release and does not provide execution timetable, margin assumptions or counterparties, so project delivery risk and revenue recognition timing remain unspecified.

TL;DR: The deal evidences industrial customers adopting large-scale storage across multiple facilities, validating market demand for Turbo Energy's offerings.

The disclosed metrics—10 factories, 366 MWh total capacity and a $53M contract value—are factual and point to meaningful commercial traction. From an industry perspective, multi-site rollouts often indicate scalable product fit and potential for follow-on orders at existing customers. The 6-K does not include contract counterparties, installation schedule, financing structure or expected revenue recognition periods, so materiality for full-year financials cannot be precisely quantified from this filing alone.

Turbo Energy ha riportato un elemento contrattuale commerciale di rilievo in un Form 6-K: un comunicato stampa datato 16 settembre 2025 che annuncia un accordo da 53 milioni di dollari per implementare 366 MWh di capacità di accumulo solare in 10 impianti. Il documento allega il comunicato stampa come allegato e porta la firma del CEO Mariano Soria. L'accordo specifica la capacità totale (366 MWh), il numero di sedi (10 impianti) e il valore contrattuale (53 milioni di dollari), indicando una distribuzione di accumulo energetico industriale su più siti per l'azienda.

Questa comunicazione rappresenta una chiara vittoria commerciale generatrice di entrate, documentata tramite la relazione periodica dell'azienda, fornendo agli investitori dettagli concreti su dimensione del contratto, ambito e sul fatto che l'annuncio sia stato reso pubblico tramite un comunicato incluso nella 6-K.

Turbo Energy informó de un contrato comercial significativo en un Form 6-K: un comunicado de prensa con fecha de 16 de septiembre de 2025 que anuncia un acuerdo de 53 millones de dólares para desplegar 366 MWh de capacidad de almacenamiento solar en 10 fábricas. El propio documento adjunta el comunicado de prensa como anexos y está firmado por el CEO Mariano Soria. El acuerdo especifica la capacidad total (366 MWh), el número de sitios (10 fábricas) y el valor del contrato (53 millones de dólares), indicando un despliegue de almacenamiento de energía industrial en múltiples sitios para la empresa.

Esta divulgación es una victoria comercial claramente orientada a generar ingresos documentada a través del informe actual de la empresa, proporcionando a los inversores detalles fácticos sobre el tamaño del contrato, el alcance y que el anuncio fue hecho público mediante un comunicado incluido con el 6-K.

Turbo Energy는 Form 6-K에서 중대한 상업 계약을 보고했습니다: 2025년 9월 16일자 보도 자료로, 10개의 공장에서 366 MWh의 태양광 저장 용량을 배치하는 5300만 달러 규모의 계약을 발표합니다. 제출서는 보도자료를 부속서로 첨부하고 CEO 마리오노 소리아가 서명했습니다. 이 계약은 총 용량 366 MWh, 사이트 수 10개, 계약 금액 5300만 달러를 명시하며, 다중 현장에 걸친 산업용 에너지 저장 배치를 나타냅니다.

이 공시는 회사의 현행 보고를 통해 수익 창출 가능한 상업적 승리를 명확히 기록하고 있으며, 계약 규모와 범위에 대한 사실적 세부 정보와 6-K에 포함된 보도 자료를 통해 발표가 공개되었음을 투자자들에게 제공합니다.

Turbo Energy a annoncé dans le Form 6-K un important contrat commercial : un communiqué de presse daté du 16 septembre 2025, annonçant un accord de 53 millions de dollars pour déployer 366 MWh de capacité de stockage solaire sur 10 sites industriels. Le dossier lui-même joint le communiqué en pièce et est signé par le PDG Mariano Soria. L’accord précise la capacité totale (366 MWh), le nombre de sites (10 usines) et la valeur du contrat (53 millions de dollars), indiquant un déploiement de stockage d’énergie industriel multi-sites pour l’entreprise.

Cette divulgation constitue une victoire commerciale clairement génératrice de revenus, documentée via le rapport courant de l’entreprise, fournissant aux investisseurs des détails factuels sur la taille du contrat, son périmètre et le fait que l’annonce a été rendue publique par le biais d’un communiqué inclus dans le 6-K.

Turbo Energy meldete einen bedeutenden kommerziellen Vertrag in einem Form 6-K: eine Pressemitteilung vom 16. September 2025, in der eine Vereinbarung über 53 Millionen US-Dollar zur Bereitstellung von 366 MWh Solarenergiespeicherkapazität in 10 Fabriken angekündigt wird. Die Einreichung bindet die Pressemitteilung als Anhang ein und ist vom CEO Mariano Soria unterschrieben. Die Vereinbarung spezifiziert die Gesamtkapazität (366 MWh), die Anzahl der Standorte (10 Fabriken) und den Vertragswert (53 Millionen US-Dollar) und deutet auf eine standortübergreifende industrielle Energiespeicher-Implementierung für das Unternehmen hin.

Diese Offenlegung ist ein klarer, um Umsätze generierender kommerzieller Gewinn, dokumentiert durch den aktuellen Bericht des Unternehmens, der Investoren konkrete Details zur Vertragsgröße, zum Umfang und dazu liefert, dass die Ankündigung über eine im 6-K enthaltene Pressemitteilung öffentlich gemacht wurde.

 

 

UNITED STATES

 

SECURITIES AND EXCHANGE COMMISSION

 

WASHINGTON, D.C. 20549

 

FORM 6-K

 

REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16

 

UNDER THE SECURITIES EXCHANGE ACT OF 1934

 

For the month of September 2025

 

Commission File Number: 001-41813

 

TURBO ENERGY, S.A.

(Name of Registrant)

 

Street Isabel la Católica, 8, Door 51,

Valencia, Spain 46004

(Address of Principal Executive Office)

 

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.

 

Form 20-F ☒       Form 40-F ☐

 

 

 

 

 

 

EXHIBIT INDEX

 

EXHIBIT NO.  DESCRIPTION
99.1  Press Release, titled “Turbo Energy Delivers Advanced Solar Energy Storage Solution to Power Uber’s Electric Fleet in Spain,” dated September 10, 2025
99.2  Press Release, titled “Turbo Energy Secures $53 Million Contract to Deploy 366 MwH of Solar Storage Capacity Across 10 Factories,” dated September 16, 2025

 

1

 

 

SIGNATURE

 

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

 

 

TURBO ENERGY, S.A.
     
Date: September 18, 2025 By: /s/ Mariano Soria
    Mariano Soria
    Chief Executive Officer

  

2

FAQ

What did Turbo Energy (TURB) announce in the 6-K?

The company attached a press release announcing a $53 million contract to deploy 366 MWh of solar storage capacity across 10 factories, dated September 16, 2025.

How much capacity will Turbo Energy deploy under the contract?

The press release states a total of 366 MWh of solar storage capacity will be deployed.

How many sites are included in the Turbo Energy contract?

The contract covers installations at 10 factories.

What is the contract value Turbo Energy disclosed?

The disclosed contract value is $53 million.

Does the 6-K provide the contract counterparty or schedule?

No. The 6-K attaches the press release but does not disclose the counterparty, installation timetable or payment milestones.
Turbo Energy SA

NASDAQ:TURB

TURB Rankings

TURB Latest News

TURB Latest SEC Filings

TURB Stock Data

112.82M
967.00k
91.22%
0.7%
0.15%
Solar
Technology
Link
Spain
Valencia