STOCK TITAN

Turbo Energy (NASDAQ: TURB) deploys 366 MWh AI-driven storage across 15 European industrial plants

(Neutral)
(Neutral)
Form Type
6-K

Rhea-AI Filing Summary

Turbo Energy, S.A. filed a report describing a major AI-enabled industrial energy infrastructure project. The company is deploying a total of 366 MWh of battery energy storage across 15 industrial facilities operated by a large European ceramic manufacturing group, as part of the Pamesa Net Zero initiative.

The project integrates Turbo Energy’s AI-driven energy management and optimization platform with advanced battery systems to coordinate solar generation, storage and industrial loads in real time. More than 130 MWh of storage capacity has already been installed, marking meaningful execution progress and the first large-scale industrial deployment of this combined solution.

The initiative positions energy as a controllable, software-defined asset aimed at improving efficiency, reducing exposure to electricity price volatility and enhancing operational resilience. The company highlights this deployment as a milestone in its transformation into an AI-driven energy infrastructure platform serving commercial and industrial markets across Europe, North America and Latin America.

Positive

  • None.

Negative

  • None.

Insights

Turbo Energy advances a sizable 366 MWh AI-enabled industrial storage project, reinforcing its shift toward software-defined energy infrastructure.

Turbo Energy is deploying 366 MWh of battery storage across 15 facilities for a large ceramic manufacturer under the Pamesa Net Zero initiative. More than 130 MWh is already installed, and the deployment showcases their AI-driven platform managing generation, storage and industrial loads as one coordinated system.

This is strategically important because it demonstrates the company’s technology at industrial scale, turning storage from passive hardware into a software-defined operational layer. It also deepens a partnership with a leading storage manufacturer that has shipped over 100 GWh of batteries by 2025, potentially enhancing Turbo Energy’s position in commercial and industrial markets.

The filing emphasizes a broader transformation toward an AI-focused energy infrastructure platform across Europe, North America and Latin America. While no revenue figures are given, successful execution and further similar deployments, if disclosed in future reports, would help investors assess the commercial impact of this large-scale reference project.

Total project storage capacity 366 MWh Planned battery energy storage across 15 industrial facilities
Installed storage to date More than 130 MWh Capacity already installed on site within the project
Number of industrial facilities 15 facilities Electro-intensive ceramic manufacturing sites in Europe
Partner cumulative ESS shipments Over 100 GWh Cumulative lithium-ion energy storage battery shipments by 2025
Global shipment ranking 2025 Top 2 globally Total and utility-scale energy storage battery shipments
Report exhibit reference Exhibit 99.1 Press release detailing the 366 MWh deployment
AI-driven energy management platform financial
"Turbo Energy’s AI-driven energy management platform, designed to continuously optimize the interaction between renewable generation, battery storage and industrial energy consumption."
software-defined energy infrastructure financial
"creating one of Europe’s most advanced software-defined energy infrastructures for industry"
Energy systems—generation, storage, distribution and consumption—that are controlled and optimized primarily by software rather than fixed hardware rules; the software acts like a traffic manager that routes, balances and schedules power in real time across grids, buildings and local power networks. It matters to investors because software-driven control can cut operating costs, accelerate renewable use and create new services and revenue, while also introducing software, cyber and regulatory risks that affect value.
battery energy storage capacity financial
"includes a total planned battery energy storage capacity of 366 MWh."
electro-intensive ceramic manufacturing group financial
"facilities belonging to one of Europe’s largest electro-intensive ceramic manufacturing groups."
forward-looking statements regulatory
"may constitute “forward-looking statements” within the meaning of The Private Securities Litigation Reform Act of 1995."
Forward-looking statements are predictions or plans that companies share about what they expect to happen in the future, like estimating sales or profits. They matter because they help investors understand a company's outlook, but since they are based on guesses and assumptions, they can sometimes be wrong.
energy storage-focused company financial
"the only energy storage-focused company to achieve GWh-scale global shipments of lithium-ion ESS batteries"

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google
Learn about SEC filing dates

FAQ

What industrial project did Turbo Energy (TURB) announce in this 6-K?

Turbo Energy announced a large AI-enabled energy infrastructure project deploying 366 MWh of battery storage across 15 industrial facilities. The project serves a major European ceramic manufacturing group under the Pamesa Net Zero initiative, focusing on electrification, decarbonization and energy independence.

How large is Turbo Energy’s new battery storage deployment?

The project includes a total planned battery energy storage capacity of 366 MWh across 15 industrial facilities. More than 130 MWh has already been installed on-site, indicating substantial progress in rolling out the large-scale industrial energy infrastructure deployment for the ceramic manufacturing group.

What role does Turbo Energy’s AI platform play in this industrial project?

Turbo Energy’s AI-driven energy management platform acts as an intelligence layer across the energy ecosystem. It continuously optimizes interactions between renewable generation, battery storage and industrial energy consumption, using predictive analytics and demand forecasting to manage energy flows and reduce exposure to electricity market volatility.

How does this project support Turbo Energy’s strategic transformation?

The deployment reinforces Turbo Energy’s shift into an AI-driven energy infrastructure platform for commercial and industrial markets. By operating at industrial scale and integrating software with advanced storage, the company positions energy as a controllable asset and strengthens its presence across Europe, North America and Latin America.

Who is Turbo Energy’s partner in this 366 MWh storage deployment?

Turbo Energy is collaborating with a global leader in battery energy storage technology that has shipped over 100 GWh of lithium-ion ESS batteries by 2025. This partner ranks Top 2 globally for total and utility-scale energy storage battery shipments, according to several industry research institutions.

What industrial customer segment is targeted by Turbo Energy’s new project?

The project targets an electro-intensive ceramic manufacturing group, reflecting focus on energy-intensive industrial customers. These users face volatile energy prices, grid constraints and decarbonization pressures, making AI-optimized storage and software-defined energy infrastructure particularly relevant for cost and resilience management.

 

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION 

WASHINGTON, D.C. 20549

 

FORM 6-K

 

REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16

UNDER THE SECURITIES EXCHANGE ACT OF 1934

 

For the month of June 2026

 

Commission File Number: 001-41813

 

TURBO ENERGY, S.A.

(Name of Registrant)

 

Plaza de América 2, 4AB
Valencia, Spain 46004

(Address of Principal Executive Office)

 

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.

 

Form 20-F Form 40-F

 

 

 

 

 

Industrial Energy Infrastructure Deployment Partnership

 

On June 24, 2026, Turbo Energy, S.A. (the “Company”) issued a press release announcing the deployment of a large-scale industrial energy infrastructure project in collaboration with HiTHIUM, a global provider of battery energy storage technologies.

 

As disclosed in the press release, the project spans 15 industrial facilities operated by a major European electro-intensive ceramic manufacturing group and includes a total planned battery energy storage capacity of 366 MWh. The project combines HiTHIUM’s battery energy storage systems with the Company’s AI-driven energy management and optimization platform, designed to optimize the interaction between renewable generation, battery storage and industrial energy consumption.

 

The press release further discusses the strategic collaboration between the Company and HiTHIUM, the integration of the Company’s software platform into large-scale industrial energy infrastructure deployments, and the Company’s continued expansion across commercial and industrial energy markets.

 

A copy of the press release is furnished as Exhibit 99.1 to this Report on Form 6-K.

 

This Report on Form 6-K is incorporated by reference into the prospectus contained in the Company’s registration statement on Form F-3 (SEC File No. 333-291470) declared effective by the Securities and Exchange Commission on December 16, 2025.

 

Index

 

EXHIBIT NO.   DESCRIPTION
99.1   Press Release titled “Turbo Energy and HiTHIUM Deploy AI-Driven Energy Infrastructure Across 15 Industrial Facilities in Europe,” dated June 24, 2026

 

1

 

 

SIGNATURE

 

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

  TURBO ENERGY, S.A.
   
Date: June 24, 2026 By: /s/ Mariano Soria
    Mariano Soria
    Chief Executive Officer

 

2

 

 

 

Exhibit 99.1

 

 

 

TURBO ENERGY AND HITHIUM DEPLOY AI-DRIVEN ENERGY INFRASTRUCTURE
ACROSS 15 INDUSTRIAL FACILITIES IN EUROPE

 

366 MWh industrial storage deployment integrates Turbo Energy’s AI optimization platform with HiTHIUM’s advanced battery systems, creating one of Europe’s most advanced software-defined energy infrastructures for industry

 

 

 

MUNICH, Germany — (GLOBE NEWSWIRE) – JUNE 24, 2026 — Turbo Energy, S.A. (Nasdaq: TURB) (“Turbo Energy” or the “Company”), a global integrator of AI-driven solar energy storage solutions and intelligent energy management systems, and HiTHIUM, a global leader in battery energy storage technology, today announced the deployment of a large-scale AI-enabled energy infrastructure project across 15 industrial facilities belonging to one of Europe’s largest electro-intensive ceramic manufacturing groups.

 

Unveiled during Intersolar Europe 2026, the project combines 366 MWh of battery energy storage capacity with Turbo Energy’s proprietary AI-driven optimization platform, transforming traditional energy storage assets into an intelligent, software-defined energy ecosystem capable of dynamically managing generation, storage and consumption across multiple industrial sites.

 

The project forms part of the Pamesa Net Zero initiative, one of Europe’s most ambitious industrial energy transformation programs, designed to accelerate the electrification, decarbonization and energy independence of one of the continent’s largest ceramic manufacturing groups.

 

Page 1 of 3

 

 

As industrial companies face increasing pressure from energy price volatility, grid constraints and decarbonization requirements, energy infrastructure is becoming increasingly complex. Solar generation, battery storage, industrial loads and grid interaction must now operate as a coordinated system capable of making real-time decisions based on operational conditions, energy pricing and consumption profiles.of making real-time decisions based on operational conditions, energy pricing and consumption profiles.

 

The project announced today represents a new generation of industrial energy architecture in which energy storage is no longer a passive asset, but an intelligent infrastructure layer capable of optimizing performance across the entire energy ecosystem.

 

The initiative spans 15 industrial facilities and includes a total project capacity of 366 MWh. To date, more than 130 MWh of storage capacity has already been installed on site, marking a significant step in the execution of the project. For the first time, Turbo Energy’s AI-driven optimization platform has been deployed alongside HiTHIUM’s advanced storage systems at industrial scale, enabling real-time energy orchestration across multiple facilities and operational environments.

 

At the core of the deployment is Turbo Energy’s AI-driven energy management platform, designed to continuously optimize the interaction between renewable generation, battery storage and industrial energy consumption. The platform functions as an intelligence layer across the energy ecosystem, enabling real-time operational decisions based on consumption patterns, market conditions and system performance.

Leveraging predictive analytics, demand forecasting and real-time operational data, the platform dynamically orchestrates energy flows to improve efficiency, reduce exposure to electricity market volatility and enhance operational resilience.

 

The result is a software-defined energy infrastructure model in which energy becomes a controllable and optimized operational asset rather than a fixed cost.

 

“Our partnership with Turbo Energy reflects HiTHIUM’s commitment to delivering intelligent, high-performance energy storage solutions tailored to the needs of Europe’s large-scale commercial and industrial enterprises,” said Kelson Li, Vice President of HiTHIUM Europe. “As industrial customers face increasing pressure from energy cost volatility, grid constraints and decarbonization targets, the combination of advanced long-duration battery storage and AI-driven energy management is becoming increasingly critical. By integrating HiTHIUM’s proven battery storage technology with Turbo Energy’s optimization capabilities, we are enabling large-scale C&I customers to deploy more resilient, efficient and economically optimized energy infrastructures. This project demonstrates how software-defined energy storage can deliver measurable operational and financial value for energy-intensive enterprises while supporting a more sustainable industrial energy future.”

 

Mariano Soria, Chief Executive Officer of Turbo Energy, added: “This project demonstrates how industrial energy infrastructure is evolving beyond hardware. The next generation of energy systems will be defined by intelligence, optimization and real-time decision-making. By combining HiTHIUM’s advanced storage technology with Turbo Energy’s AI-driven platform, we are transforming battery systems into intelligent energy assets capable of adapting to industrial operating conditions, improving efficiency and supporting long-term competitiveness.

 

We believe software-defined energy infrastructure will become a critical foundation for the future of industrial electrification, where artificial intelligence enables energy systems to operate with greater efficiency, resilience and autonomy.”

 

This milestone further reinforces Turbo Energy’s strategic transformation into an AI-driven energy infrastructure platform combining advanced storage, intelligent software and energy optimization services across commercial and industrial markets. It also marks an important step in the Company’s strategic partnership with HiTHIUM, accelerating the deployment of intelligent energy infrastructure solutions across international markets.

 

The Company continues expanding its international footprint through large-scale industrial deployments, energy storage projects and AI-enabled energy management solutions across Europe, North America and Latin America.

 

Page 2 of 3

 

 

About Turbo Energy, S.A.

 

Founded in 2013, Turbo Energy, S.A. (Nasdaq: TURB) is a global integrator of AI-driven solar energy storage solutions and intelligent energy management systems. Turbo Energy’s technology platform enables residential, commercial and industrial customers to reduce energy costs, improve efficiency, enhance resilience and transform energy consumption into a controllable and optimized asset. As part of Umbrella Global Energy, Turbo Energy plays a central role as the Group’s technology platform, driving innovation in energy storage, electrification and intelligent energy management across international markets in Europe, North America and Latin America. For more information, please visit www.turbo-e.com.

 

About Hithium

 

Founded in 2019, HiTHIUM is a leading global company in renewable energy technology, committed to delivering energy storage solutions centered on advanced energy storage battery and system technologies. With robust research, production, sales, and service capabilities worldwide, HiTHIUM is the only energy storage-focused company to achieve GWh-scale global shipments of lithium-ion ESS batteries, reaching a milestone of over 100GWh in cumulative shipments in 2025. Capping off a remarkable year, HiTHIUM secured the Top 2 position globally for both total energy storage battery shipments and utility-scale battery shipments in 2025, according to authoritative institutions including InfoLink, SMM, and ICC. Through HiTHIUM Europe, the company now delivers to over 18 European countries, including the world’s first 1175Ah project. Its customer-centric approach drives cutting-edge products and solutions for customers all over the world.

 

Forward-Looking Statements

 

Statements in this press release about future expectations, plans and prospects, as well as any other statements regarding matters that are not historical facts, may constitute “forward-looking statements” within the meaning of The Private Securities Litigation Reform Act of 1995. Forward-looking statements are neither historical facts nor assurances of future performance. Instead, they are based only on current beliefs, expectations and assumptions regarding the future of the business of the Company, future plans and strategies, projections, anticipated events and trends, the economy and other future conditions. The words “anticipate,” “believe,” “continue,” “could,” “estimate,” “expect,” “intend,” “may,” “plan,” “potential,” “predict,” “project,” “should,” “target,” “will,” “would” and similar expressions are intended to identify forward-looking statements, although not all forward-looking statements contain these identifying words. Because forward-looking statements relate to the future, they are subject to inherent uncertainties, risks and changes in circumstances that are difficult to predict and many of which are outside of the Company’s control, including the risks described in the Company’s registration statements and annual report under the heading “Risk Factors” as filed with the Securities and Exchange Commission. Actual results and financial condition may differ materially from those indicated in the forward-looking statements. Therefore, you should not rely on any of these forward-looking statements. Any forward-looking statements contained in this press release speak only as of the date hereof, and Turbo Energy, S.A. specifically disclaims any obligation to update any forward-looking statement, whether as a result of new information, future events or otherwise.

 

For more information, please contact:  
   
Turbo Energy | Investor Relations  
Email: investors@turbo-e.com  
Website: investors.turbo-e.com  

 

Page 3 of 3

Filing Exhibits & Attachments

1 document