STOCK TITAN

Athena Gold Completes Maiden Drill Program at Laird Lake Project in Ontario's Red Lake Gold District

(Very Positive)
Tags

Athena Gold (OTCQB: AHNRF) completed its maiden diamond drill program at the Laird Lake Project in Ontario's Red Lake Gold District. The program totaled 5,134 metres across nine drill holes. Assay results are expected by early August, and demobilization and site clean-up are underway. Technical information was reviewed by Qualified Person Benjamin Kuzmich, P.Geo.

Loading...
Loading translation...

Positive

  • None.

Negative

  • None.

News Market Reaction – AHNRF

-7.90%
-7.90% Session close to close

In the Jul 2 session, AHNRF declined 7.90%, reflecting a notable negative market reaction.

Data tracked by StockTitan Argus on the day of publication.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

White Rock, British Columbia--(Newsfile Corp. - July 2, 2026) - Athena Gold Corporation (CSE: ATHA) (OTCQB: AHNRF) ("Athena" or the "Company") is pleased to provide an exploration update from its flagship Laird Lake Project ("Laird Lake" or the "Project") in Ontario's Red Lake Gold District.

The Company has successfully completed its maiden drill program at the Project, which comprised a total of 5,134 metres across nine diamond drill holes (Figure 1/Table 1). The Company expects to receive all pending assays by early August. Crews have now commenced demobilization, with site clean-up activities underway.

"We are pleased to have safely and successfully completed our maiden drill program at Laird Lake, the culmination of years of hard work modernizing historical geophysical data through 3D inversions and completing an extensive +2,000 sample geochemical program. We extend our sincere thanks to Wabauskang First Nation and the Cameron family for their partnership and support throughout the program. We look forward to receiving all pending assay results and providing further updates to shareholders," said Koby Kushner, CEO of Athena.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/12323/303702_4eb6b75c14c01bb0_002.jpg

Figure 1: Map of Laird Lake, showing completed diamond drill holes.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/12323/303702_4eb6b75c14c01bb0_002full.jpg

Table 1: Laird Lake diamond drill hole locations, depths and orientations.

Hole IDEasting (UTM)Northing (UTM)Drilled Depth (m)Azimuth (degrees)Dip
LL-26-001416707564384932334045
LL-26-002421146564372373733545
LL-26-00342094856436812634545
LL-26-003A420948564368171634545
LL-26-004420175564362552130045
LL-26-005420175564362531130065
LL-26-00642017556436251434045
LL-26-006A420175564362575234045
LL-26-007420615564349047935045
LL-26-008420615564349072529045
LL-26-009421197564361953035560



5134

 

Qualified Persons Statement

The technical information presented in this news release has been reviewed and approved by Benjamin Kuzmich, P.Geo., Vice President of Exploration for Athena Gold Corporation, and the Qualified Person as defined by NI 43-101 "Standards of Disclosure for Mineral Projects".

About Athena Gold Corporation

Athena is engaged in the business of mineral exploration and the acquisition of mineral property assets. Its objective is to locate and develop economic precious and base metal properties of merit and to conduct additional exploration drilling and studies on its projects across North America. Athena's Laird Lake project is situated in the Red Lake Gold District of Ontario, covering more than 7,000 hectares along more than 10 km of the Balmer-Confederation Assemblage contact, where recent surface sampling results returned up to 373 g/t Au. This underexplored area is road-accessible, located about 10 km west of West Red Lake Gold's Madsen mine and 34 km northwest of Kinross Gold's Great Bear project. Also in northwestern Ontario is Athena's Forester project, a 4,900-hectare land package located less than 30 km southeast of Orla Mining's Musselwhite Gold Mine, with historical drill intercepts showing strong potential for both high-grade, narrow-vein and low-grade, bulk-tonnage gold mineralization. Meanwhile, Athena's Excelsior Springs project is located in the prolific Walker Lane Trend in Nevada, where it is currently under an earn-in option with Mammoth Minerals Limited (formerly Firetail Resources Limited). The Excelsior Springs project spans more than 2,500 hectares and includes at least three historic mines. For further information about Athena Gold Corporation, please visit www.athenagoldcorp.com.

On Behalf of the Board of Directors
Koby Kushner
President and Chief Executive Officer, Athena Gold Corporation

For further information, please contact:

Athena Gold Corporation
Koby Kushner, President and Chief Executive Officer
Phone: 416-846-6164
Email: kobykushner@athenagoldcorp.com

CHF Capital Markets
Cathy Hume, CEO
Phone: 416-868-1079 x 251
Email: cathy@chfir.com

Forward-Looking Statements

This press release contains forward-looking statements and forward-looking information (collectively, "forward-looking statements") within the meaning of applicable Canadian and U.S. securities laws. All statements, other than statements of historical facts, included herein, including, without limitation, statements regarding future exploration plans, future results from exploration, and the anticipated business plans and timing of future activities of the Company, are forward-looking statements. Although the Company believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. Forward-looking statements are typically identified by words such as: "believes", "will", "expects", "anticipates", "intends", "estimates", "plans", "may", "should", ''potential", "scheduled", or variations of such words and phrases and similar expressions, which, by their nature, refer to future events or results that may, could, would, might or will occur or be taken or achieved. In making the forward-looking statements in this press release, the Company has applied several material assumptions, including without limitation, that there will be investor interest in future financings, market fundamentals will result in sustained precious metals demand and prices, the receipt of any necessary permits, licenses and regulatory approvals in connection with the future exploration and development of the Company's projects in a timely manner.

The Company cautions investors that any forward-looking statements by the Company are not guarantees of future results or performance, and that actual results may differ materially from those in forward-looking statements.

Readers are cautioned not to place undue reliance on forward-looking statements. The Company undertakes no obligation to update any of the forward-looking statements in this press release or incorporated by reference herein, except as otherwise stated.

Neither the Canadian Securities Exchange nor its regulation services provider accepts responsibility for the adequacy or accuracy of this release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/303702

FAQ

What did Athena Gold (OTCQB: AHNRF) announce about the Laird Lake drill program on July 2, 2026?

Athena Gold announced it has completed its maiden diamond drill program at the Laird Lake Project. According to Athena Gold, the program totaled 5,134 metres across nine holes, with assay results expected by early August and demobilization now underway.

How many metres and drill holes were completed in Athena Gold’s Laird Lake maiden program (AHNRF)?

Athena Gold completed 5,134 metres of drilling across nine diamond drill holes at Laird Lake. According to Athena Gold, these holes tested multiple locations in Ontario’s Red Lake Gold District, with detailed coordinates and depths listed for each hole in the program.

When does Athena Gold (AHNRF) expect assay results from the Laird Lake drilling?

Athena Gold expects to receive all pending assay results from the Laird Lake drill program by early August. According to Athena Gold, drilling is finished and crews have begun demobilization and site clean-up as they await these initial exploration results for the project.

Who is the Qualified Person for Athena Gold’s Laird Lake Project (AHNRF)?

The Qualified Person for Athena Gold’s Laird Lake Project is Benjamin Kuzmich, P.Geo. According to Athena Gold, Kuzmich serves as Vice President of Exploration and has reviewed and approved the technical information under NI 43-101 mineral project disclosure standards.

Where is Athena Gold’s Laird Lake Project (AHNRF) located and why is it notable?

Laird Lake is located in Ontario’s Red Lake Gold District, a recognized gold exploration area. According to Athena Gold, Laird Lake is the company’s flagship project, and the completed 5,134-metre maiden drill program represents a key step in its exploration efforts there.