STOCK TITAN

Diamond Drilling Commences at Excelsior Gold-Silver Project, Nevada

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags

Athena Gold (OTCQB:AHNRF) announced on October 7, 2025 that diamond drilling has commenced at the 100%‑owned Excelsior Springs project in Nevada.

The program is fully funded by Mammoth Minerals (ASX:M79) under an option to earn an 80% interest over five years; Athena retains a free‑carry to a Definitive Feasibility Study. Athena currently holds 32,000,000 Mammoth shares valued at ~AUD $5,120,000. The campaign is the first diamond drilling at Excelsior and will collect metallurgical and geotechnical core and test structural controls over historical high‑grade mineralization, following notable previous intercepts (examples: 51.8m @ 4.00 g/t Au, 33.5m @ 5.35 g/t Au). QA/QC and a Qualified Person review are reported; historical records remain unverified and require follow‑up.

Athena Gold (OTCQB:AHNRF) ha annunciato il 7 ottobre 2025 che la perforazione con trapano a diamante è iniziata presso il progetto Excelsior Springs, di proprietà al 100% e situato nel Nevada.

Il programma è interamente finanziato da Mammoth Minerals (ASX:M79) nell'ambito di un'opzione per acquisire l'80% di interesse entro cinque anni; Athena mantiene una free carry fino allo Studio di Fattibilità Definitivo. Athena detiene attualmente 32.000.000 azioni Mammoth, valutate circa AUD 5.120.000. La campagna rappresenta la prima perforazione con diamante a Excelsior e raccoglierà campioni metallurgici e geotecnici e testerà i controlli strutturali sulla mineralizzazione storica ad alto grado, in seguito a intercepts notevoli precedenti (esempi: 51,8 m @ 4,00 g/t Au, 33,5 m @ 5,35 g/t Au). Controlli QA/QC e revisione da parte di una Persona Qualificata sono riportati; i registri storici restano non verificati e richiedono follow-up.

Athena Gold (OTCQB:AHNRF) anunció el 7 de octubre de 2025 que el perforado con diamante ha comenzado en el proyecto Excelsior Springs, 100% de propiedad, en Nevada.

El programa está completamente financiado por Mammoth Minerals (ASX:M79) bajo una opción para obtener un 80% de interés en cinco años; Athena mantiene una carry libre hasta un Estudio de Factibilidad Definitivo. Athena posee actualmente 32,000,000 de acciones de Mammoth valoradas en aproximadamente AUD 5,120,000. La campaña es la primera perforación con diamante en Excelsior y recogerá muestras metalúrgicas y geotécnicas de núcleo y probará controles estructurales sobre la mineralización histórica de alto grado, tras interceptos notables previos (p. ej.: 51,8 m @ 4,00 g/t Au, 33,5 m @ 5,35 g/t Au). QA/QC y revisión por una Persona Calificada son reportados; los registros históricos permanecen no verificados y requieren seguimiento.

Athena Gold (OTCQB:AHNRF)2025년 10월 7일에 네바다주에 위치한 100% 소유 Excelsior Springs 프로젝트에서 다이아몬드 드릴링이 시작되었다고 발표했습니다.

프로그램은 Mammoth Minerals (ASX:M79)가 5년 동안 80% 지분을 취득하기 위한 옵션으로 전액 자금을 지원합니다; Athena는 Definitive Feasibility Study까지의 자유캐리(free-carry)를 보유합니다. Athena는 현재 32,000,000 Mammoth 주식을 보유하고 있으며 가치는 약 AUD 5,120,000입니다. 이번 시추는 Excelsior의 첫 다이아몬드 드릴링이며 과거 고품질 광석의 구조적 통제를 시험하기 위해 샘플을 채취하고, 주목할 만한 이전 인터섹트(51.8m @ 4.00 g/t Au, 33.5m @ 5.35 g/t Au)를 따라 진행합니다. QA/QC 및 자격 있는 사람(QP) 검토가 보고되며, 과거 기록은 확인되지 않았고 후속 조치가 필요합니다.

Athena Gold (OTCQB:AHNRF) a annoncé le 7 octobre 2025 que le forage à diamant a commencé sur le projet Excelsior Springs, détenu à 100% et situé dans le Nevada.

Le programme est entièrement financé par Mammoth Minerals (ASX:M79) dans le cadre d'une option pour détenir 80% des intérêts sur cinq ans; Athena conserve une carry libre jusqu'à une Étude de faisabilité définitive. Athena détient actuellement 32 000 000 d'actions Mammoth, évaluées à environ AUD 5 120 000. La campagne est le premier forage diamant à Excelsior et collectera des carottes métallurgiques et géotechniques et testera les contrôles structurels sur la minéralisation historique à haut grade, suite à des intercepts notables antérieurs (51,8 m @ 4,00 g/t Au, 33,5 m @ 5,35 g/t Au). QA/QC et une révision par une Personne Qualifiée sont reportés; les dossiers historiques restent non vérifiés et nécessitent un suivi.

Athena Gold (OTCQB:AHNRF) gab am 7. Oktober 2025 bekannt, dass Diamantbohrungen am zu 100% im Besitz befindlichen Excelsior Springs-Projekt in Nevada begonnen haben.

Das Programm wird vollständig von Mammoth Minerals (ASX:M79) im Rahmen einer Option zur Erlangung von 80% Anteil in fünf Jahren finanziert; Athena behält eine Free Carry bis zur Definitive Feasibility Study. Athena hält derzeit 32.000.000 Mammoth-Aktien, bewertet mit ca. AUD 5.120.000. Die Kampagne ist die erste Diamantbohrung bei Excelsior und wird metallurgische und geotechnische Proben sammeln und strukturelle Kontrollen über die historische hochgradige Mineralisierung testen, nach bemerkenswerten früheren Intercepts (51,8 m @ 4,00 g/t Au, 33,5 m @ 5,35 g/t Au). QA/QC und eine Überprüfung durch eine qualifizierte Person sind gemeldet; historische Unterlagen bleiben unbestätigt und erfordern Nachverfolgung.

Athena Gold (OTCQB:AHNRF) أعلنت في 7 أكتوبر 2025 أن الحفر الماسي قد بدأ في مشروع Excelsior Springs المملوك بنسبة 100% في نيفادا.

البرنامج ممول بالكامل من Mammoth Minerals (ASX:M79) بموجب خيار للحصول على 80% من المصالح خلال خمس سنوات; تحتفظ Athena بCarry مجاني حتى دراسة الجدوى النهائية. تمتلك Athena حالياً 32,000,000 سهماً من Mammoth بقيمة تقرب من AUD 5,120,000. تعتبر الحملة أول حفر ماسي في Excelsior وستجمع عينات معدنية وميكانيكية جيولوجية من النواة وتختبر الضوابط الهيكلية على تواجد تاريخي عالي الجودة من الخامات، وفقاً لعينات سابقة ملحوظة (51.8m @ 4.00 g/t Au, 33.5m @ 5.35 g/t Au). يُذكر QA/QC ومراجعة من قبل شخص مؤهل؛ لا تزال السجلات التاريخية غير محققة وتتطلب متابعة.

Athena Gold (OTCQB:AHNRF)2025年10月7日 宣布,位于内华达州、100% 自有的 Excelsior Springs 项目已展开钻石钻探。

该计划完全由 Mammoth Minerals (ASX:M79) 资助,基于在五年内取得 80% 权益 的期权;Athena 保留到 Definitive Feasibility Study 的自由携带(free-carry)。Athena 目前持有 32,000,000 股 Mammoth,估值约为 AUD 5,120,000。此次勘探是 Excelsior 的首次钻石钻探,将收集冶金与地质技术芯样,并测试历史高品位矿化的结构控制,参照早期显著截获 (51.8m @ 4.00 g/t Au, 33.5m @ 5.35 g/t Au)。报告了 QA/QC 与合格人员的审核;历史记录仍未验证,需要后续跟进。

Positive
  • Diamond drilling campaign commenced on Oct 7, 2025
  • Drilling fully funded by Mammoth under option agreement
  • Option allows Mammoth to earn 80% interest over five years
  • Athena owns 32,000,000 Mammoth shares (~AUD $5.12M)
  • Program includes metallurgical and geotechnical core sampling
Negative
  • If earn‑in completes, Athena would hold only 20% interest
  • Historical production and intercepts are not yet verified
  • Option structure delays Athena cash flow/control for up to 5 years

Diamond drilling underway to define the geometry and extent of the mineralization at the Buster Trend, as well as to provide metallurgical and geotechnical samples

WHITE ROCK, BC, CA / ACCESS Newswire / October 7, 2025 / Athena Gold Corporation (CSE:ATHA)(OTCQB:AHNRF) ("Athena" or the "Company") is pleased to announce the commencement of drilling at its 100%-owned Excelsior Springs project in Nevada. The drilling is fully funded by Mammoth Minerals Limited (ASX:M79) (formerly Firetail Resources Limited), per its option agreement to earn an 80% interest in the project over five years, providing Athena a free-carry to Definitive Feasibility Study thereafter (see press releases dated June 2, 2025 and August 22, 2025). As of the date of this press release, Athena owns 32,000,000 ordinary shares of Mammoth Minerals Limited, valued at approximately AUD $5,120,000.

Highlights

  • First-ever diamond drilling campaign commences at the Excelsior Springs project in Nevada, USA.

  • Second diamond drill rig expected to arrive on site in the near-term to expedite the program.

  • Diamond drilling will enable detailed structural measurements to be taken that are integral to understanding the controls on the mineralization at Excelsior - with reported historical production of 19,200 oz at 41g/t Au from the Buster Underground Mine.

  • Drilling will follow up on significant previous intercepts, (refer to ASX press release dated June 2, 2025 "Firetail Secures Option to Acquire Two High Grade USA Gold Projects in Tier-1 Locations") including:

    • 51.8m at 4.00g/t Au from 39.6m - 22_01

      • Including 6.1m at 16.30g/t Au from 42.7m

    • 33.5m at 5.35g/t Au from 41.2m - DB23

      • Including 10.7m at 15.99g/t Au from 41.2m

    • 32.0m at 2.45g/t Au from 44.2m - 22_02

      • Including 6.1m at 10.00g/t Au from 45.7m

    • 24.4m at 3.62 g/t Au from 70.1m - EX2

      • Including 9.2m at 7.99g/t Au from 79.2m

  • Metallurgical testing on the diamond drill core will be undertaken to understand the leaching characteristics to provide a processing pathway and a guide towards metal recoveries.

  • Geotechnical logging will be completed to assist with future development studies.

  • Channel sampling completed recently across the Blue Dick Underground Mine, which exploited high-grade silver ore - samples submitted for expedited assays.

  • Property-wide magnetics and LIDAR survey commenced across the Excelsior Project.

Figure 1: Diamond Drill Rig at Excelsior Gold-Silver Project near Buster Headframe

This initial drilling campaign is the first diamond drilling ever undertaken at Excelsior. Previous drilling was completed using Reverse Circulation (RC) drilling. The important differential is that the level of geological information obtained from diamond drilling will assist greatly with interpretation of the geology and provide the Company with a greatly enhanced ability to understand the controls on the high-grade mineralization.

QA/QC
The technical information presented in this news release has been reviewed by Benjamin Kuzmich, P.Geo., Vice President of Exploration for Athena Gold Corporation, and the Qualified Person for exploration at the Excelsior Lake Project, as defined by NI 43-101 "Standards of Disclosure for Mineral Projects". Readers are cautioned that historical records referred to in this press release have been examined but not verified by a Qualified Person. Further work is required to verify that historical records referred to in this press release are accurate. Information contained in this press release was taken from Mammoth Minerals Limited's recent press release dated October 6, 2025.

About Athena Gold Corporation
Athena is engaged in the business of mineral exploration and the acquisition of mineral property assets. Its objective is to locate and develop economic precious and base metal properties of merit and to conduct additional exploration drilling and studies on its projects across North America. Athena's Laird Lake project is situated in the Red Lake Gold District of Ontario, covering over 7,000 hectares along more than 10 km of the Balmer-Confederation Assemblage contact, where recent surface sampling results returned up to 373 g/t Au. This underexplored area is road-accessible, located about 10 km west of West Red Lake Gold's Madsen mine and 34 km northwest of Kinross Gold's Great Bear project. Meanwhile, its Excelsior Springs project is located in the prolific Walker Lane Trend in Nevada, where it is currently under an earn-in option with Mammoth Minerals Limited (formerly, Firetail Resources Limited). Excelsior Springs spans over 2,500 hectares and covers at least three historic mines. Athena also holds 100% interest in its Oneman Lake Au-VMS project in Ontario.

For further information about Athena Gold Corporation, please visit www.athenagoldcorp.com.

On Behalf of the Board of Directors
Koby Kushner
President and Chief Executive Officer, Athena Gold Corporation

For further information, please contact:
Athena Gold Corporation
Koby Kushner, President and Chief Executive Officer
Phone: 416-846-6164
Email: kobykushner@athenagoldcorp.com

CHF Capital Markets
Cathy Hume, CEO
Phone: 416-868-1079 x 251
Email: cathy@chfir.com

Forward-Looking Statements
This press release contains forward-looking statements and forward-looking information (collectively, "forward-looking statements") within the meaning of applicable Canadian and US. securities laws. All statements, other than statements of historical fact, included herein, including, without limitation, statements regarding future exploration plans, future results from exploration, and the anticipated business plans and timing of future activities of the Company, are forward-looking statements. Although the Company believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. Forward-looking statements are typically identified by words such as: "believes", "will", "expects", "anticipates", "intends", "estimates", "plans", "may", "should", ''potential", "scheduled", or variations of such words and phrases and similar expressions, which, by their nature, refer to future events or results that may, could, would, might or will occur or be taken or achieved. In making the forward-looking statements in this press release, the Company has applied several material assumptions, including without limitation, that there will be investor interest in future financings, market fundamentals will result in sustained precious metals demand and prices, the receipt of any necessary permits, licenses and regulatory approvals in connection with the future exploration and development of the Company's projects in a timely manner.

The Company cautions investors that any forward-looking statements by the Company are not guarantees of future results or performance, and that actual results may differ materially from those in forward-looking statements.

Readers are cautioned not to place undue reliance on forward-looking statements. The Company undertakes no obligation to update any of the forward-looking statements in this press release or incorporated by reference herein, except as otherwise stated.

Neither the Canadian Securities Exchange nor its regulation services provider accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Athena Gold Corporation



View the original press release on ACCESS Newswire

FAQ

What did Athena announce about drilling at Excelsior Springs (AHNRF) on October 7, 2025?

Athena announced that diamond drilling has commenced at Excelsior Springs and is fully funded by Mammoth per an option agreement.

How does the Mammoth option agreement affect Athena shareholders (AHNRF)?

Mammoth can earn an 80% interest over five years; Athena is carried to a Definitive Feasibility Study and currently holds 32M Mammoth shares valued at ~AUD $5.12M.

What drilling objectives did Athena list for the Excelsior program (AHNRF)?

Objectives include defining mineralization geometry, collecting metallurgical and geotechnical core, and taking detailed structural measurements to understand controls on high‑grade mineralization.

Will the drill program test previous high‑grade intercepts at Excelsior (AHNRF)?

Yes. Drilling will follow up significant historical intercepts such as 51.8m @ 4.00 g/t Au and 33.5m @ 5.35 g/t Au reported in prior work.

When will assay and metallurgical results from the AHNRF drilling be available?

No specific dates were provided; the company said assays and metallurgical testing will be undertaken on diamond core with expedited assays for some samples.

Are the historical production and intercepts at Excelsior verified (AHNRF)?

The release cautions that historical records have been examined but not verified by a Qualified Person; further work is required to confirm accuracy.
Athena Gold Corp

OTC:AHNRF

AHNRF Rankings

AHNRF Latest News

AHNRF Stock Data

13.00M
85.64M
67%
Other Precious Metals & Mining
Basic Materials
Link
United States
Vacaville